  1. PWR internals segmentation and packaging experience in the U.S

    International Nuclear Information System (INIS)

    Kreitman, P.J.

    2008-01-01

    Seven commercial nuclear power plants of the Pressurized Water Reactor (PWR) design have been permanently shut down in the US to date. Six of these plants have been decommissioned using dismantling methods. The remaining plant, Indian Point 1, located in Buchanan, NY, has been placed in Safe Storage. Of the six dismantled plants, five underwent extensive segmentation, separation, and packaging of their internal components to allow removal and disposal of the reactor vessel assembly. Only the Trojan Plant in Portland, Oregon, was able to ship the reactor vessel assembly with its internals intact to the final disposal site near Richland, Washington. An important part of the planning for the upcoming decommissioning of similar plants in Europe such as Chooz A in France and Zorita in Spain will be to study the lessons learned from the US efforts and apply the best practices to future projects. This paper will chronicle the evolution of the reactor internals segmentation and packaging process to date, including the planning, methodology, equipment, waste management, and packaging strategy. (author)

  2. Nondestructive examination requirements for PWR vessel internals

    International Nuclear Information System (INIS)

    Spanner, J.

    2015-01-01

    This paper describes the requirements for the nondestructive examination of pressurized water reactor (PWR) vessel internals in accordance with the requirements of the EPRI Material Reliability Program (MRP) inspection standard for PWR internals (MRP-228) and the American Society of Mechanical Engineers Section XI In-service Inspection. The MRP vessel internals examinations have been performed at nuclear plants in the USA since 2009. The objective of the inspection standard is to provide the requirements for the nondestructive examination (NDE) methods implemented to support the inspection and evaluation of the internals. The inspection standard contains requirements specific to the inspection methodologies involved as well as requirements for qualification of the NDE procedures, equipment and personnel used to perform the vessel internals inspections. The qualification requirements for the NDE systems will be summarized. Six PWR plants in the USA have completed inspections of their internals using the Inspection and Evaluation Guideline (MRP-227) and the Inspection Standard (MRP-228). Examination results show few instances of service-induced degradation flaws, as expected. The few instances of degradation have mostly occurred in bolting

  3. International EUREKA: Initialization Segment

    International Nuclear Information System (INIS)

    1982-02-01

    The Initialization Segment creates the starting description of the uranium market. The starting description includes the international boundaries of trade, the geologic provinces, resources, reserves, production, uranium demand forecasts, and existing market transactions. The Initialization Segment is designed to accept information of various degrees of detail, depending on what is known about each region. It must transform this information into a specific data structure required by the Market Segment of the model, filling in gaps in the information through a predetermined sequence of defaults and built in assumptions. A principal function of the Initialization Segment is to create diagnostic messages indicating any inconsistencies in data and explaining which assumptions were used to organize the data base. This permits the user to manipulate the data base until such time the user is satisfied that all the assumptions used are reasonable and that any inconsistencies are resolved in a satisfactory manner

  4. Characterization of Factors affecting IASCC of PWR Core Internals

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Woo; Hwang, Seong Sik; Kim, Won Sam [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2008-09-15

    A lot works have been performed on IASCC in BWR. Recent efforts have been devoted to investigate IASCC in PWR, but the mechanism in PWR is not fully understood yet as compared with that in BWR due to a lack of data from laboratories and fields. Therefore it is strongly needed to review and analyse recent researches of IASCC in both BWR and PWR for establishing a proactive management technology for IASCC of core internals in Korean PWRs. This work is aimed to review mainly recent technical reports on IASCC of stainless steels for core internals in PWR. For comparison, the works on IASCC in BWR were also reviewed and briefly introduced in this report.

  5. Essays in international market segmentation

    NARCIS (Netherlands)

    Hofstede, ter F.

    1999-01-01

    The primary objective of this thesis is to develop and validate new methodologies to improve the effectiveness of international segmentation strategies. The current status of international market segmentation research is reviewed in an introductory chapter, which provided a number of

  6. Method of characteristics - Based sensitivity calculations for international PWR benchmark

    International Nuclear Information System (INIS)

    Suslov, I. R.; Tormyshev, I. V.; Komlev, O. G.

    2013-01-01

    Method to calculate sensitivity of fractional-linear neutron flux functionals to transport equation coefficients is proposed. Implementation of the method on the basis of MOC code MCCG3D is developed. Sensitivity calculations for fission intensity for international PWR benchmark are performed. (authors)

  7. International EUREKA: Market Segment

    International Nuclear Information System (INIS)

    1982-03-01

    The purpose of the Market Segment of the EUREKA model is to simultaneously project uranium market prices, uranium supply and purchasing activities. The regional demands are extrinsic. However, annual forward contracting activities to meet these demands as well as inventory requirements are calculated. The annual price forecast is based on relatively short term, forward balances between available supply and desired purchases. The forecasted prices and extrapolated price trends determine decisions related to exploration and development, new production operations, and the operation of existing capacity. Purchasing and inventory requirements are also adjusted based on anticipated prices. The calculation proceeds one year at a time. Conditions calculated at the end of one year become the starting conditions for the calculation in the subsequent year

  8. Vibration behavior of PWR reactor internals Model experiments and analysis

    International Nuclear Information System (INIS)

    Assedo, R.; Dubourg, M.; Livolant, M.; Epstein, A.

    1975-01-01

    In the late 1971, the CEA and FRAMATOME decided to undertake a comprehensive joint program of studying the vibration behavior of PWR internals of the 900 MWe, 50 cycle, 3 loop reactor series being built by FRAMATOME in France. The PWR reactor internals are submitted to several sources of excitation during normal operation. Two main sources of excitation may effect the internals behavior: the large flow turbulences which could generate various instabilities such as: vortex shedding: the pump pressure fluctuations which could generate acoustic noise in the circuit at frequencies corresponding to shaft speed frequencies or blade passing frequencies, and their respective harmonics. The flow induced vibrations are of complex nature and the approach selected, for this comprehensive program, is semi-empirical and based on both theoretical analysis and experiments on a reduced scale model and full scale internals. The experimental support of this program consists of: the SAFRAN test loop which consists of an hydroelastic similitude of a 1/8 scale model of a PWR; harmonic vibration tests in air performed on full scale reactor internals in the manufacturing shop; the GENNEVILLIERS facilities which is a full flow test facility of primary pump; the measurements carried out during start up on the Tihange reactor. This program will be completed in April 1975. The results of this program, the originality of which consists of studying separately the effects of random excitations and acoustic noises, on the internals behavior, and by establishing a comparison between experiments and analysis, will bring a major contribution for explaining the complex vibration phenomena occurring in a PWR

  9. EDF studies on PWR vessel internal loading

    International Nuclear Information System (INIS)

    Bellet, S.; Vallat, S.

    1998-01-01

    EDF has undertaken some mechanics and thermal-hydraulics studies with the objective of mastering plant phenomena today and in order to numerically predict the behaviour of vessel internals on units planned for the future. From some justifications already underway after in operation incidents (wear and drop time of RCCA rods, fuel deflection, adapter cracks, baffle bolt cracks) we intend to control reactor vessel flows and mechanical behaviour of internal structures. During normal operation, thermal-hydraulic is the main load of vessel internals. The current approach consists of acquiring the capacity to link different calculations, taking care that codes are qualified for physical phenomena and complex 3D geometries. For baffle assembly, a more simple model of this structure has been used to treat the physical phenomena linked to the LOCA transient. Results are encouraging mainly due to code capacity progression (resolution and models), which allows more and more complex physical phenomena to be treated, like turbulence flow and LOCA. (author)

  10. PWR upper/lower internals shield

    Energy Technology Data Exchange (ETDEWEB)

    Homyk, W.A. [Indian Point Station, Buchanan, NY (United States)

    1995-03-01

    During refueling of a nuclear power plant, the reactor upper internals must be removed from the reactor vessel to permit transfer of the fuel. The upper internals are stored in the flooded reactor cavity. Refueling personnel working in containment at a number of nuclear stations typically receive radiation exposure from a portion of the highly contaminated upper intervals package which extends above the normal water level of the refueling pool. This same issue exists with reactor lower internals withdrawn for inservice inspection activities. One solution to this problem is to provide adequate shielding of the unimmersed portion. The use of lead sheets or blankets for shielding of the protruding components would be time consuming and require more effort for installation since the shielding mass would need to be transported to a support structure over the refueling pool. A preferable approach is to use the existing shielding mass of the refueling pool water. A method of shielding was devised which would use a vacuum pump to draw refueling pool water into an inverted canister suspended over the upper internals to provide shielding from the normally exposed components. During the Spring 1993 refueling of Indian Point 2 (IP2), a prototype shield device was demonstrated. This shield consists of a cylindrical tank open at the bottom that is suspended over the refueling pool with I-beams. The lower lip of the tank is two feet below normal pool level. After installation, the air width of the natural shielding provided by the existing pool water. This paper describes the design, development, testing and demonstration of the prototype device.

  11. Upper internals of PWR with coolant flow separator

    International Nuclear Information System (INIS)

    Chevereau, G.; Heuze, A.

    1989-01-01

    The upper internals for a PWR has a collecting volume for the coolant merging from the core and an apparatus for separating the flow of coolant. This apparatus has a guide for the control rods, a lower plate perforated to allow the coolant through from the core, an upper plate also perforated to allow the coolant through to the collecting volume and a peripheral binding ring joining the two plates. Each guide comprises an envelope without holes and joined perceptibly tight to the plates [fr

  12. Degradation of fastener in reactor internal of PWR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, D. W.; Ryu, W. S.; Jang, J. S.; Kim, S. H.; Kim, W. G.; Chung, M. K.; Han, C. H

    2000-03-01

    Main component degraded in reactor internal structure of PWR is fastener such as bolts, stud, cap screw, and pins. The failure of these components may damage nuclear fuel and limits the operation of nuclear reactor. In foreign reactors operated more than 10 years, an increasing number of incidents of degraded thread fasteners have been reported. The degradation of these components impair the integrity of reactor internal structure and limit the life extension of nuclear power plant. To solve the problem of fastener failure, the incidents of failure and main mechanisms should be investigated. the purpose of this state-of-the -art report is to investigate the failure incidents and mechanisms of fastener in foreign and domestic PWR and make a guide to select a proper materials. There is no intent to describe each event in detail in this report. This report covers the failures of fastener and damage mechanisms reported by the licensees of operating nuclear power plants and the applications of plants constructed after 1964. This information is derived from pertinent licensee event report, reportable occurrence reports, operating reactor event memoranda, failure analysis reports, and other relevant documents. (author)

  13. Informational segmentation in international capital markets

    OpenAIRE

    Wahl, Jack E.

    1988-01-01

    The economic influence of barriers to international information acquisition and, hence, of informational segmentation in international capital markets depends heavily upon the prevailing level of risk aversion. We find that these barriers are likely to have second order economic impact only. Furthermore, improving international informational integration is likely to Increase all asset prices when causing less heterogeneity of international subjective probability beliefs.

  14. Characterization of Decommissioned PWR Vessel Internals Material Samples: Tensile and SSRT Testing (Nonproprietary Version)

    International Nuclear Information System (INIS)

    Krug, M.; Shogan, R.

    2004-01-01

    Pressurized water reactor (PWR) cores operate under extreme environmental conditions due to coolant chemistry, operating temperature, and neutron exposure. Extending the life of PWRs requires detailed knowledge of the changes in mechanical and corrosion properties of the structural austenitic stainless steel components adjacent to the fuel (internals) subjected to such conditions. This project studied the effects of reactor service on the mechanical and corrosion properties of samples of baffle plate, former plate, and core barrel from a decommissioned PWR

  15. Characterization of Decommissioned PWR Vessel Internals Materials Samples: Material Certification, Fluence, and Temperature (Nonproprietary Version)

    International Nuclear Information System (INIS)

    Krug, M.; Shogan, R.; Fero, A.; Snyder, M.

    2004-01-01

    Pressurized water reactor (PWR) cores, operate under extreme environmental conditions due to coolant chemistry, operating temperature, and neutron exposure. Extending the life of PWRs require detailed knowledge of the changes in mechanical and corrosion properties of the structural austenitic stainless steel components adjacent to the fuel. This report contains basic material characterization information of the as-installed samples of reactor internals material which were harvested from a decommissioned PWR

  16. Short-term calculations to supplement the RS 16 B PWR experiments with internals (PWR1 to PWR5), using the LECK 4 computer code

    International Nuclear Information System (INIS)

    Hughes, G.; Mueller, R.

    1980-03-01

    Within the framework of research project RS 16 B sponsored by the German BMFT a series of a blowdown experiments, DWR1 to DWR5, were performed using a vessel with dummy internals under conditions similar to those in a PWR. The prime objective of these experiments was the investigation of the highly transient blowdown phenomena in the discharge nozzle and the determination of the induced loads on the internals. As a partner in the project, KWU carried out both pre-test predictions and post-test analyses of these experiments using, among others, the computer code LECK 4. For the most severe blowdown test DWR5, the influence of the most important model parameters on the blowdown analysis was investigated in detail. These investigations suggest that, similar to the long-term analyses, calculations using the homogeneous critical flow model would improve agreement between calculation and experiment. (orig./RW) [de

  17. Experience with mechanical segmentation of reactor internals

    International Nuclear Information System (INIS)

    Carlson, R.; Hedin, G.

    2003-01-01

    Operating experience from BWE:s world-wide has shown that many plants experience initial cracking of the reactor internals after approximately 20 to 25 years of service life. This ''mid-life crisis'', considering a plant design life of 40 years, is now being addressed by many utilities. Successful resolution of these issues should give many more years of trouble-free operation. Replacement of reactor internals could be, in many cases, the most favourable option to achieve this. The proactive strategy of many utilities to replace internals in a planned way is a market-driven effort to minimize the overall costs for power generation, including time spent for handling contingencies and unplanned outages. Based on technical analyses, knowledge about component market prices and in-house costs, a cost-effective, optimized strategy for inspection, mitigation and replacements can be implemented. Also decommissioning of nuclear plants has become a reality for many utilities as numerous plants worldwide are closed due to age and/or other reasons. These facts address a need for safe, fast and cost-effective methods for segmentation of internals. Westinghouse has over the last years developed methods for segmentation of internals and has also carried out successful segmentation projects. Our experience from the segmentation business for Nordic BWR:s is that the most important parameters to consider when choosing a method and equipment for a segmentation project are: - Safety, - Cost-effectiveness, - Cleanliness, - Reliability. (orig.)

  18. Identifying spatial segments in international markets

    NARCIS (Netherlands)

    Ter Hofstede, F; Wedel, M; Steenkamp, JBEM

    2002-01-01

    The identification of geographic target markets is critical to the success of companies that are expanding internationally. Country borders have traditionally been used to delineate such target markets, resulting in accessible segments and cost efficient entry strategies. However, at present such

  19. Hydroelastic model of PWR reactor internals SAFRAN 1 - Validation of a vibration calculation method

    International Nuclear Information System (INIS)

    Epstein, A.; Gibert, R.J.; Jeanpierre, F.; Livolant, M.

    1978-01-01

    The SAFRAN 1 test loop consists of an hydroelastic similitude of a 1/8 scale model of a 3 loop P.W.R. Vibrations of the main internals (thermal shield and core barrel) and pressure fluctuations in water thin sections between vessel and internals, and in inlet and outlet pipes, have been measured. The calculation method consists of: an evaluation of the main vibration and acoustic sources owing to the flow (unsteady jet impingement on the core barrel, turbulent flow in a water thin section). A calculation of the internal modal parameters taking into account the inertial effects of fluid (the computer codes AQUAMODE and TRISTANA have been used). A calculation of the acoustic response of the circuit (the computer code VIBRAPHONE has been used). The good agreement between the calculation and the experimental results allows using this method with better security for the prediction of the vibration levels of full scale P.W.R. internals

  20. Segmentation and packaging reactor vessels internals

    International Nuclear Information System (INIS)

    Boucau, Joseph

    2014-01-01

    Document available in abstract form only, full text follows: With more than 25 years of experience in the development of reactor vessel internals and reactor vessel segmentation and packaging technology, Westinghouse has accumulated significant know-how in the reactor dismantling market. The primary challenges of a segmentation and packaging project are to separate the highly activated materials from the less-activated materials and package them into appropriate containers for disposal. Since disposal cost is a key factor, it is important to plan and optimize waste segmentation and packaging. The choice of the optimum cutting technology is also important for a successful project implementation and depends on some specific constraints. Detailed 3-D modeling is the basis for tooling design and provides invaluable support in determining the optimum strategy for component cutting and disposal in waste containers, taking account of the radiological and packaging constraints. The usual method is to start at the end of the process, by evaluating handling of the containers, the waste disposal requirements, what type and size of containers are available for the different disposal options, and working backwards to select a cutting method and finally the cut geometry required. The 3-D models can include intelligent data such as weight, center of gravity, curie content, etc, for each segmented piece, which is very useful when comparing various cutting, handling and packaging options. The detailed 3-D analyses and thorough characterization assessment can draw the attention to material potentially subject to clearance, either directly or after certain period of decay, to allow recycling and further disposal cost reduction. Westinghouse has developed a variety of special cutting and handling tools, support fixtures, service bridges, water filtration systems, video-monitoring systems and customized rigging, all of which are required for a successful reactor vessel internals

  1. Assessment of void swelling in austenitic stainless steel PWR core internals

    International Nuclear Information System (INIS)

    Chung, H.M.

    2006-01-01

    As many pressurized water reactors (PWRs) age and life extension of the aged plants is considered, void swelling behavior of austenitic stainless steel (SS) core internals has become the subject of increasing attention. In this report, the available database on void swelling and density change of austenitic SSs was critically reviewed. Irradiation conditions, test procedures, and microstructural characteristics were carefully examined, and key factors that are important to determine the relevance of the database to PWR conditions were evaluated. Most swelling data were obtained from steels irradiated in fast breeder reactors at temperatures >385 C and at dose rates that are orders of magnitude higher than PWR dose rates. Even for a given irradiation temperature and given steel, the integral effects of dose and dose rate on void swelling should not be separated. It is incorrect to extrapolate swelling data on the basis of 'progressive compounded multiplication' of separate effects of factors such as dose, dose rate, temperature, steel composition, and fabrication procedure. Therefore, the fast reactor data should not be extrapolated to determine credible void swelling behavior for PWR end-of-life (EOL) or life-extension conditions. Although the void swelling data extracted from fast reactor studies is extensive and conclusive, only limited amounts of swelling data and information have been obtained on microstructural characteristics from discharged PWR internals or steels irradiated at temperatures and at dose rates comparable to those of a PWR. Based on this relatively small amount of information, swelling in thin-walled tubes and baffle bolts in a PWR is not considered a concern. As additional data and relevant research becomes available, the newer results should be integrated with existing data, and the worthiness of this conclusion should continue to be scrutinized. PWR baffle reentrant corners are the most likely location to experience high swelling rates, and

  2. Aging management of PWR reactor internals in U.S. plants

    International Nuclear Information System (INIS)

    Amberge, K.J.; Demma, A.

    2015-01-01

    This paper describes the development, aging management strategies and inspection results of the Pressurized Water Reactor (PWR) vessel internals inspection and evaluation guidelines. The goal of these guidelines is to provide PWR owners with robust aging management strategies to monitor degradation of internals components to support life extension as well as the current period of operation and power up-rate activities. The implementation of these guidelines began in 2010 within the U.S. PWR fleet and several examinations have been performed since. Examples of inspection results are presented for selected vessel internals components and are compared with simulation results. In summary, to date there have been no observations of austenitic stainless steel stress corrosion cracking (SCC), which is consistent with expectations based on the current understanding of the mechanism. Observations of irradiation assisted stress corrosion cracking (IASCC) have been limited and only found in baffle former bolting. Additionally, no macroscopic effects or global observations of void swelling impacts on general conditions of reactor internal hardware have been observed. (authors)

  3. PWR reactor pressure vessel internals license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Schwirian, R.; Robison, G.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures and components, in the license renewal technical Industry Reports (IRs). License renewal applicants may choose to reference these IRs in support of their plant-specific license renewal applications, as an equivalent to the integrated plant assessment provisions of the license renewal rule (10 CFR Part 54). Pressurized water reactor (PWR) reactor pressure vessel (RPV) internals designed by all three U.S. PWR nuclear steam supply system vendors have been evaluated relative to the effects of age-related degradation mechanisms; the capability of current design limits; inservice examination, testing, repair, refurbishment, and other programs to manage these effects; and the assurance that these internals can continue to perform their intended safety functions in the license renewal term. This industry report (IR), one of a series of ten, provides a generic technical basis for evaluation of PWR reactor pressure vessel internals for license renewal

  4. Dynamics in international market segmentation of new product growth

    NARCIS (Netherlands)

    Lemmens, A.; Croux, C.; Stremersch, S.

    2012-01-01

    Prior international segmentation studies have been static in that they have identified segments that remain stable over time. This paper shows that country segments in new product growth are intrinsically dynamic. We propose a semiparametric hidden Markov model to dynamically segment countries based

  5. Lifetime assessment on PWR reactor vessel internals in Korea

    International Nuclear Information System (INIS)

    Jung, Sung-Gyu; Jin, Tae-Eun; Jeong, Ill-Seok

    2002-01-01

    In order to extend the operating time of the Kori Unit 1 reactor internals, a comprehensive review of the potential ageing problems and a safety assessment have been performed. As the plant ages, reactor internal components which are subject to various ageing mechanism should be identified and evaluated based on the systematic technical procedure. In this respect, technical procedure for lifetime evaluation had been developed and applied to reactor internals. This paper describes a overall assessment and ageing management procedure and evaluation results for reactor internals. Also this paper suggests the optimal ageing management programs to maintain the integrity of reactor internals beyond design life based on the evaluation results. A review of all known potential ageing mechanisms was performed for each of the reactor internal subcomponents. From these results, 8 ageing mechanisms such as void swelling, irradiation and thermal embrittlement, fatigue, stress corrosion cracking, IASCC, stress relaxation, and wear for the reactor internal components were expected to be of major concerns during the current or extended plant life. In this study, 8 ageing mechanisms were identified for lifetime evaluation. For these ageing mechanisms, lifetime assessment was performed. As a result of this evaluation, it is expected that core barrel will exceed the IASCC threshold value during 40 operating years, and baffle/former and baffle former bolts will exceed the threshold value for void swelling, irradiation embrittlement, IASCC, stress relaxation during 40 operating years. However, for all other reactor internals subcomponents, thermal embrittlement, fatigue, SCC, and wear were identified as nonsignificant. As a result of lifetime evaluations, 4 ageing mechanisms were established to be plausible for 3 subcomponents. These results are shown. The existing ageing management programs (AMPs) for Kori Unit 1, such as ISI, water chemistry control, rod drop time testing etc., were

  6. An overview of reactor vessel internals segmentation for nuclear plant decommissioning

    International Nuclear Information System (INIS)

    Litka, T.J.

    1994-01-01

    Several nuclear plants have undergone reactor vessel (RV) internals segmentation as part of or in preparation for decommissioning the plant. In addition, several other nuclear facilities are planning for similar work efforts. The primary technology used for segmentation of RV internals, whether in-air or underwater is Plasma Arc Cutting (PAC). Metal Disintegration Machining (MDM) is also used for difficult to make cuts. PAC and MDM are deployed by various means including Long Handled Tools (LHTs), fixtures, tracks, and multi-axis manipulators. These enable remote cutting due to the radiation and/or underwater environment. A Boiling Water Reactor (BWR), a Pressurized Water Reactor (PWR), and a High Temperature Gas Reactor (HTGR) have had their internals removed and segmented using PAC and MDM. The cutting technology used for each component, location of cut, cut geometry and environment had to be determined well before the actual cutting operations. This allowed for the design, fabrication, and testing of the delivery systems. The technologies, selection process, and methodology for RV internals segmentation will be discussed in this paper

  7. International Good Market Segmentation and Financial Market Structure

    OpenAIRE

    Basak, Suleyman; Croitoru, Benjamin

    2003-01-01

    While financial markets have recently become more complete and international capital flows well liberalized, markets for goods remain segmented. To investigate how more complete security markets may relieve the effects of this segmentation, we examine a series of two-country economies with internationally segmented good markets, distinguished by the available financial securities. We show that, under heterogeneity within countries, the financial structure matters: even with internationally co...

  8. Feedback from Westinghouse experience on segmentation of reactor vessel internals - 59013

    International Nuclear Information System (INIS)

    Kreitman, Paul J.; Boucau, Joseph; Segerud, Per; Fallstroem, Stefan

    2012-01-01

    With more than 25 years of experience in the development of reactor vessel internals segmentation and packaging technology, Westinghouse has accumulated significant know-how in the reactor dismantling market. Building on tooling concepts and cutting methodologies developed decades ago for the successful removal of nuclear fuel from the damaged Three Mile Island Unit 2 reactor (TMI-2), Westinghouse has continuously improved its approach to internals segmentation and packaging by incorporating lessons learned and best practices into each successive project. Westinghouse has developed several concepts to dismantle reactor internals based on safe and reliable techniques, including plasma arc cutting (PAC), abrasive water-jet cutting (AWJC), metal disintegration machining (MDM), or mechanical cutting. Westinghouse has applied its technology to all types of reactors covering Pressurized Water Reactors (PWR's), Boiling Water Reactors (BWR's), Gas Cooled Reactors (GCR's) and sodium reactors. The primary challenges of a segmentation and packaging project are to separate the highly activated materials from the less-activated materials and package them into appropriate containers for disposal. Since space is almost always a limiting factor it is therefore important to plan and optimize the available room in the segmentation areas. The choice of the optimum cutting technology is important for a successful project implementation and depends on some specific constraints like disposal costs, project schedule, available areas or safety. Detailed 3-D modeling is the basis for tooling design and provides invaluable support in determining the optimum strategy for component cutting and disposal in waste containers, taking account of the radiological and packaging constraints. Westinghouse has also developed a variety of special handling tools, support fixtures, service bridges, water filtration systems, video-monitoring systems and customized rigging, all of which are required for a

  9. The deformation of zircaloy PWR cladding with low internal pressures, under mainly convective cooling by steam

    International Nuclear Information System (INIS)

    Hindle, E.D.; Mann, C.A.; Reynolds, A.E.

    1981-01-01

    The deformation behaviour is reported of specimens of Zircaloy PWR fuel cladding when directly heated in flowing steam. The range of internal pressures studied was 0.69-2.07 MPa; this extended earlier studies using higher pressures. The specimens were ramped and then held at a steady test temperature until rupture or until 600 seconds had elapsed. Under these conditions it was found that extended deformation occurred with pressures down to 1 MPa at temperatures up to 900 deg C. At lower pressures and higher temperatures there was no large extended deformation; this is believed to result from the effects of oxidation

  10. Study on dynamic characteristics of reduced analytical model for PWR reactor internal structures

    International Nuclear Information System (INIS)

    Yoo, Bong; Lee, Jae Han; Kim, Jong Bum; Koo, Kyeong Hoe

    1993-01-01

    The objective of this study is to establish the procedure of the reduced analytical modeling technique for the PWR reactor internal(RI) structures and to carry out the sensitivity study of the dynamic characteristics of the structures by varying the structural parameters such as the stiffness, the mass and the damping. Modeling techniques for the PWR reactor internal structures and computer programs used for the dynamic analysis of the reactor internal structures are briefly investigated. Among the many components of RI structures, the dynamic characteristics for CSB was performed. The sensitivity analysis of the dynamic characteristics for the reduced analytical model considering the variations of the stiffnesses for the lower and upper flanges of the CSB and for the RV Snubber were performed to improve the dynamic characteristics of the RI structures against the external loadings given. In order to enhance the structural design margin of the RI components, the nonlinear time history analyses were attempted for the RI reduced models to compare the structural responses between the reference model and the modified one. (Author)

  11. Simulation model and methodology for calculating the damage by internal radiation in a PWR reactor; Modelo de simulacion y metodologia para el calculo del dano por irradiacion en los internos de un reactor PWR

    Energy Technology Data Exchange (ETDEWEB)

    Cadenas Mendicoa, A. M.; Benito Hernandez, M.; Barreira Pereira, P.

    2012-07-01

    This study involves the development of the methodology and three-dimensional models to estimate the damage to the vessel internals of a commercial PWR reactor from irradiation history of operating cycles.

  12. Computer-generated vibratory signatures for EDF PWR reactor vessel internals

    International Nuclear Information System (INIS)

    Trenty, A.; Lefevre, F.; Garreau, D.

    1992-07-01

    This paper presents a device for generation of characteristic signatures for normal or faulty vibrations on EDF PWR internal structures. The objective is to test the efficiency of methods for diagnosing faults in these structures. With this device, it is possible to build an entire PSD in several phases: choice of a general basic shape, localized addition of several kinds of background noise, generation of peaks of variable shapes, adjustment of local or global amplifications... It also offers the possibility of distorting real PSDs acquired from the reactor: shifting frequency or modifying peak shape, eliminating or adding existing shapes or shapes to be created, smoothing curves... One example is given of simulated loss of function in a hold-down spring on a computer-generated PSD of ex-core neutron noise. The device is now being used to test the potential of neural networks in recognizing faults on internal structures

  13. Reactor Vessel and Reactor Vessel Internals Segmentation at Zion Nuclear Power Station - 13230

    Energy Technology Data Exchange (ETDEWEB)

    Cooke, Conrad; Spann, Holger [Siempelkamp Nuclear Services: 5229 Sunset Blvd., (Suite M), West Columbia, SC, 29169 (United States)

    2013-07-01

    Zion Nuclear Power Station (ZNPS) is a dual-unit Pressurized Water Reactor (PWR) nuclear power plant located on the Lake Michigan shoreline, in the city of Zion, Illinois approximately 64 km (40 miles) north of Chicago, Illinois and 67 km (42 miles) south of Milwaukee, Wisconsin. Each PWR is of the Westinghouse design and had a generation capacity of 1040 MW. Exelon Corporation operated both reactors with the first unit starting production of power in 1973 and the second unit coming on line in 1974. The operation of both reactors ceased in 1996/1997. In 2010 the Nuclear Regulatory Commission approved the transfer of Exelon Corporation's license to ZionSolutions, the Long Term Stewardship subsidiary of EnergySolutions responsible for the decommissioning of ZNPS. In October 2010, ZionSolutions awarded Siempelkamp Nuclear Services, Inc. (SNS) the contract to plan, segment, remove, and package both reactor vessels and their respective internals. This presentation discusses the tools employed by SNS to remove and segment the Reactor Vessel Internals (RVI) and Reactor Vessels (RV) and conveys the recent progress. SNS's mechanical segmentation tooling includes the C-HORCE (Circumferential Hydraulically Operated Cutting Equipment), BMT (Bolt Milling Tool), FaST (Former Attachment Severing Tool) and the VRS (Volume Reduction Station). Thermal segmentation of the reactor vessels will be accomplished using an Oxygen- Propane cutting system. The tools for internals segmentation were designed by SNS using their experience from other successful reactor and large component decommissioning and demolition (D and D) projects in the US. All of the designs allow for the mechanical segmentation of the internals remotely in the water-filled reactor cavities. The C-HORCE is designed to saw seven circumferential cuts through the Core Barrel and Thermal Shield walls with individual thicknesses up to 100 mm (4 inches). The BMT is designed to remove the bolts that fasten the Baffle

  14. International market segmentation based on consumer-product relations

    NARCIS (Netherlands)

    ter Hofstede, F; Steenkamp, JBEM; Wedel, M

    With increasing competition in the global marketplace, international segmentation has become an ever more important issue in developing, positioning, and selling products across national borders. The authors propose a methodology to identify cross-national market segments, based on means-end chain

  15. Segmentation across International Equity, Bond, and Foreign Exchange Markets

    OpenAIRE

    Cathy Ning; Stephen Sapp

    2009-01-01

    In this paper, we examine the integration of international financial markets. The integration of financial markets across countries and across asset classes is assumed to hold in most empirical studies, but has only been tested for certain countries and certain asset classes. We test for the integration of international equity, bond and foreign exchange markets. Our results indicate that the three classes of assets are segmented. Investigating potential explanations for this segmentation, we ...

  16. Aging management of reactor internals and license renewal of US PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Tang, H. T. [Electric Power Research Institute, EPRI, 3420 Hillview Avenue, Palo Alto, California 94304 (United States)

    2006-09-15

    Age-related degradation mechanisms of key components are subject to aging management review by utilities considering plant license renewal. The management of aging effects in PWR internals must be demonstrated as specified in the US NRC Standard Review. The US NRC staff has also issued a Generic Aging Lessons Learned (GALL) report that documents the staff's basis for determining when existing generic programs are adequate to manage aging without change and when existing generic programs should be augmented for license renewal. The EPRI Materials Reliability Program (MRP) has been conducting studies to develop technical bases and guidelines to support aging management of PWR internals, with a particular attention to utility License Renewal commitments. The strategic approach taken by the MRP includes: developing an overall aging management framework, defining degradation mechanism screening values, categorizing and ranking internals components based on screening, performing functionality analyses and safety evaluation, and developing inspection and evaluation guidelines associated with each category of components. Screening criteria are developed for the following potential internals degradation mechanisms: - Stress Corrosion Cracking [Excluding Irradiation Effects]; - Irradiation-Assisted Stress Corrosion Cracking; - Thermal Aging Embrittlement; - Irradiation Embrittlement; - Void Swelling; - Stress Relaxation and Creep [Irradiation-enhanced]; - Wear; - Fatigue. The ranking and categorization calls to bin internals components into four categories: - Category A: component items for which aging degradation significance is minimal and aging effects are below the screening criteria; - Category C: 'lead' component items for which aging degradation significance is high or moderate and aging effects are above screening levels; - Category B: component items above screening levels but are not 'lead' component items and aging degradation significance

  17. The deformation of Zircaloy PWR cladding with low internal pressures, under mainly convective cooling by steam

    International Nuclear Information System (INIS)

    Hindle, E.D.; Mann, C.A.; Reynolds, A.E.

    1981-08-01

    Simulated PWR fuel rods clad with Zircaloy-4 were tested under convective steam cooling conditions, by pressurising to 0.69-2.07MPa (100-300lb/in 2 ), then ramping at 10 0 C/s to various temperatures in the region 800-955 0 C and holding until either 600 s elapsed or rupture occurred. The length of cladding strained 33% or more was greatest (about 20 times the original diameter) when the initial internal pressure was 1.38+-0.17 PMa (200+-25lb/in 2 ), and the temperature 885 0 C. It is thought that this results from oxidation strengthening of the surface layers acting as an additional mechanism for stabilising the deformation and/or partial superplastic deformation. To avoid adjacent rods in a fuel assembly touching at any temperature, the pressure would have to be less than about 1MPa (145 1b/in 2 ). If the pressure was 1.38MPa (200lb/in 2 ) then the rods would not swell sufficiently to touch if the temperature did not exceed about 840 0 C. (author)

  18. Optimization of reactor pressure vessel internals segmentation in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung-Sik [Dankook Univ., Chungnam (Korea, Republic of). Dept. of Nuclear Engineering

    2017-11-15

    One of the most challenging tasks during plant decommissioning is the removal of highly radioactive internal components from the reactor pressure vessel (RPV). For RPV internals dismantling, it is essential that all activities are thoroughly planned and discussed in the early stage of the decommissioning project. One of the key activities in the detailed planning is to prepare the segmentation and packaging plan that describes the sequential steps required to segment, separate, and package each individual component of RPV, based on an activation analysis and component characterization study.

  19. Best practices for preparing vessel internals segmentation projects

    International Nuclear Information System (INIS)

    Boucau, Joseph; Segerud, Per; Sanchez, Moises

    2016-01-01

    Westinghouse has been involved in reactor internals segmentation activities in the U.S. and Europe for 30 years. Westinghouse completed in 2015 the segmentation of the reactor vessel and reactor vessel internals at the Jose Cabrera nuclear power plant in Spain and a similar project is on-going at Chooz A in France. For all reactor dismantling projects, it is essential that all activities are thoroughly planned and discussed up-front together with the customer. Detailed planning is crucial for achieving a successful project. One key activity in the preparation phase is the 'Segmentation and Packaging Plan' that documents the sequential steps required to segment, separate, and package each individual component, based on an activation analysis and component characterization study. Detailed procedures and specialized rigging equipment have to be developed to provide safeguards for preventing certain identified risks. The preparatory work can include some plant civil structure modifications for making the segmentation work easier and safer. Some original plant equipment is sometimes not suitable enough and need to be replaced. Before going to the site, testing and qualification are performed on full scale mock-ups in a specially designed pool for segmentation purposes. The mockup testing is an important step in order to verify the function of the equipment and minimize risk on site. This paper is describing the typical activities needed for preparing the reactor internals segmentation activities using under water mechanical cutting techniques. It provides experiences and lessons learned that Westinghouse has collected from its recent projects and that will be applied for the new awarded projects. (authors)

  20. A complex study on the reliability assessment of the containment of a PWR. Part I - Magnitude and probability of internal load behavior

    International Nuclear Information System (INIS)

    Augustin, W.; Kafka, P.

    1977-01-01

    For evaluation of the reliability of the safety enclosure in the case of accidents the time-dependent loads by internal pressure and temperature on the spheric steel containment and the correspondent probabilities had to be calculated. Of the spectrum of possible accidents, e.g. large LOCA which leads to a maximum pressure of approximately 4.7 bar. working of all safety systems presumed, small LOCA or rupture of a primary steam pipe, only those have been selected which result in a considerable increase of internal pressure in the safety containment. The pressure buildup in the steel containment depends roughly on the radioactive decay energy produced in the containment, on the performance of the safety systems operative after the accident and on the energy absorbed and transferred by the structural parts of the containment. For simplification the analysis of system behavior was performed in separate steps. Analysis was started by evaluation of alternate possibilities of pressure buildup depending on the function of different safety systems. Then the time dependent changes of temperature and pressure in the containment were calculated as well as the probabilities of the occurrence of the different maximum pressures. Technical data and accident event sequences describing the system analysed were taken from the PWR Biblis B, which at this time is typical for the PWR-line construction in the FRG. In order to avoid event sequences leading to complicated physical phenomena such sequences were selected which allowed well-defined description of consequences as hydrogen production by reaction of water with the Zircalloy fuel cladding or pressure buildup by CO 2 or steam generated from concrete getting in contact with the core-melt. The computer code ZOCO VI was used to calculate pressure buildup for the different event sequences. This code calculates time dependence of pressure and temperature in a multiply segmented safety containment considering accumulation and

  1. Semi-automatic ultrasonic inspection of PWR upper internal immersed components

    International Nuclear Information System (INIS)

    Dombret, P.; Coquette, A.; Cermak, J.; Verspeelt, D.

    1985-01-01

    The present paper describes the characteristics of a semi-automatic ultrasonic inspection system. Components inspected are the so-called flexures, small pins located at the upper part of control rod tube-guide, some of which happened to broke in a few Westinghouse type PWR's. Inspection results and other system capabilities are also mentioned

  2. ASSESSING INTERNATIONAL MARKET SEGMENTATION APPROACHES: RELATED LITERATURE AT A GLANCE AND SUGGESSTIONS FOR GLOBAL COMPANIES

    OpenAIRE

    Nacar, Ramazan; Uray, Nimet

    2015-01-01

    With the increasing role of globalization, international market segmentation has become a critical success factor for global companies, which aim for international market expansion. Despite the practice of numerous methods and bases for international market segmentation, international market segmentation is still a complex and an under-researched area. By considering all these issues, underdeveloped and under-researched international market segmentation bases such as social, cultural, psychol...

  3. Assessment and management of ageing of major nuclear power plant components important to safety: PWR vessel internals: 2007 update

    International Nuclear Information System (INIS)

    2007-06-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that effective control of the ageing degradation of the major NPP components (e.g. caused by unanticipated phenomena and by operating, maintenance or manufacturing errors) is one of the most important issues for plant safety and also plant life. Ageing in these NPPs must be therefore effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling within acceptable limits the ageing degradation and wearout of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. IAEA-TECDOC-1119 documents ageing assessment and management practices for PWR Reactor Vessel Internals (RVIs) that were current at the time of its finalization in 1997-1998. Safety significant operating events have occurred since the finalization of the TECDOC, e.g. irradiation assisted stress corrosion cracking (IASCC) of baffle-former bolts, which threatened the integrity of the vessel internals. In addition, concern of fretting wear of control rod guide tubes has been raised in Japan. These events led to new ageing management actions by both NPP operators and regulators. Therefore it was recognized that IAEA-TECDOC-1119 should be updated by incorporating those new events and their countermeasures. The objective of this report is to update relevant sections of the existing IAEA-TECDOC- 1119 in order to provide current ageing management guidance for PWR RVIs to all involved in the operation and regulation of PWRs and thus to help ensure PWR safety in IAEA Member States throughout their entire service life

  4. License agreements: segmentation within the international market of seeds

    Directory of Open Access Journals (Sweden)

    Lina María Díaz Vera

    2017-08-01

    Full Text Available The self-replicating nature of seeds poses a challenge for the traditional configuration of Intellectual property rights, as it overlooks the boundary that prevents amateurs from replicating the technology embedded on it. The territorial scope of IP rights and the lack of an international consensus regarding the exhaustion of IP right aggravates the issue. This loophole enhances the segmentation of markets through license agreements of patents and plant varieties which multinationals employ to drag resources all along the market chain, by demanding payment of fees to each shackle. This might constitute an infringement of Competition Law regimes which is undertaken differently according with the tradition of each country but always with the aim of protecting the well-functioning of their internal market.

  5. Ultimate analysis of PWR prestressed concrete containment subjected to internal pressure

    International Nuclear Information System (INIS)

    Hu, H.-T.; Lin, Y.-H.

    2006-01-01

    Numerical analyses are carried out by using the ABAQUS finite element program to predict the ultimate pressure capacity and the failure mode of the PWR prestressed concrete containment at Maanshan nuclear power plant. Material nonlinearity such as concrete cracking, tension stiffening, shear retention, concrete plasticity, yielding of prestressing tendon, yielding of steel reinforcing bar and degradation of material properties due to high temperature are all simulated with proper constitutive models. Geometric nonlinearity due to finite deformation has also been considered. The results of the analysis show that when the prestressed concrete containment fails, extensive cracks take place at the apex of the dome, the junction of the dome and cylinder, and the bottom of the cylinder connecting to the base slab. In addition, the ultimate pressure capacity of the containment is higher than the design pressure by 86%

  6. International standard problem ISP36. Cora-W2 experiment on severe fuel damage for a Russian type PWR

    International Nuclear Information System (INIS)

    1996-01-01

    An OECD/NEA-CSNI International Standard Problem (ISP) has been performed on the experimental comparison basis of the severe fuel damage experiment CORA-W2. The out-of-pile experiment CORA-W2 was executed in February 1993 at he Forschungszentrum Karlsruhe. The objective of this experiment was the investigation of the behavior of a Russian type PWR fuel element (VVER-1000) during early core degradation. The main difference between a Western type and a Russian type PWR bundle is the B 4 C absorber rod instead of AgInCd. Measured quantities ar boundary conditions, bundle temperature, hydrogen generation and the final bundle configurations after cooldown. The ISP was conducted as a blind exercise. Boundary conditions were estimated using ATHLET-CD. Six different severe accident codes were used. The comparisons between experimental and analytical results were grouped by codes and examined separately. The thermal behavior up to significant oxidation has been predicted quite well. Larger deviations have been observed for the oxidation-induced temperature escalation, both time of onset and maximum temperature as well. The bundle behavior is greatly influenced by chemical interactions involving B 4 C absorber rod material, which failed relatively early at low temperature due to eutectic interaction between B 4 C and SS cladding as well as the SS guide tube. Regarding the complex material interaction larger differences can be recognized between calculated and measured results because of inappropriate models for material relocation and solidification processes and the lack of models describing the interactions of absorber rod materials with the fuel rods. For the total amount of H 2 generated, acceptable agreement could be achieved, if the total of oxidized zirconium was calculated correctly. The oxidation of stainless steel components and B 4 C were not treated. In general the confidence in code predictions decreases with processing core damage. (N.T.)

  7. International standard problem ISP36. Cora-W2 experiment on severe fuel damage for a Russian type PWR

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    An OECD/NEA-CSNI International Standard Problem (ISP) has been performed on the experimental comparison basis of the severe fuel damage experiment CORA-W2. The out-of-pile experiment CORA-W2 was executed in February 1993 at he Forschungszentrum Karlsruhe. The objective of this experiment was the investigation of the behavior of a Russian type PWR fuel element (VVER-1000) during early core degradation. The main difference between a Western type and a Russian type PWR bundle is the B{sub 4}C absorber rod instead of AgInCd. Measured quantities ar boundary conditions, bundle temperature, hydrogen generation and the final bundle configurations after cooldown. The ISP was conducted as a blind exercise. Boundary conditions were estimated using ATHLET-CD. Six different severe accident codes were used. The comparisons between experimental and analytical results were grouped by codes and examined separately. The thermal behavior up to significant oxidation has been predicted quite well. Larger deviations have been observed for the oxidation-induced temperature escalation, both time of onset and maximum temperature as well. The bundle behavior is greatly influenced by chemical interactions involving B{sub 4}C absorber rod material, which failed relatively early at low temperature due to eutectic interaction between B{sub 4}C and SS cladding as well as the SS guide tube. Regarding the complex material interaction larger differences can be recognized between calculated and measured results because of inappropriate models for material relocation and solidification processes and the lack of models describing the interactions of absorber rod materials with the fuel rods. For the total amount of H{sub 2} generated, acceptable agreement could be achieved, if the total of oxidized zirconium was calculated correctly. The oxidation of stainless steel components and B{sub 4}C were not treated. In general the confidence in code predictions decreases with processing core damage. 36 refs.

  8. International experience with a multidisciplinary table top exercise for response to a PWR accident

    International Nuclear Information System (INIS)

    Lakey, J.R.A.

    1996-01-01

    Table Top Exercises are used for the training of emergency response personnel from a wide range of disciplines whose duties range from strategic to tactical, from managerial to operational. The exercise reported in this paper simulates the first two or three hours of an imaginary accident on a generic PWR site (named Seaside or Lakeside depending on its location). It is designed to exercise the early response of staff of the utility, government, local authority and the media and some players represent the public. The relatively few scenarios used for this exercise are based on actual events scaled to give off-site consequences which demand early assessment and therefore stress the communication procedures. The exercise is applicable in different cultures and has been used in over 20 short courses held in the USA, UK, Sweden, Prague, and Hong Kong. There are two styles of support for players: a linear program which ensures that all players follow the desired path through the event and an open program which is triggered by umpires (who play the reactor crew from a script) and by requests from other players. In both cases the exercise ends with a Press Conference. Players have an initial briefing and are assigned to roles; those who must speak at interviews and at the Press Conference arc given separate briefing by an expert in Public Affairs. The exercise runs with up to six groups and the communication rate reaches about 30 to 40 messages per hour for each group. The exercise can be applied to test management and communication systems and to study human response to emergencies because the merits of individual players are highlighted in the relatively stressful conditions of the initial stage of an accident. For some players the exercise is the first time that they have been required to carry out their task in front of other people

  9. External and internal accidents in PWR power plants. Comparison of current regulations in Belgium, United States, France, Federal Republic of Germany and United Kingdom

    International Nuclear Information System (INIS)

    Maere, G. de; Roch, M.; Cavaco, A.; Preat, M.

    1986-01-01

    In this report a comparison is made of the rules and practices applied in various countries (Belgium, France, Federal Republic of Germany, United Kingdom and United States of America) in designing PWR plants to resist natural hazards (first part of the report) and hazards associated with human activities (second part). The third part of the report deals with the practices in different countries concerning the protection against accidents of internal origin [fr

  10. Irradiated stainless steel material constitutive model for use in the performance evaluation of PWR pressure vessel internals

    Energy Technology Data Exchange (ETDEWEB)

    Rashid, J.Y.; Dunham, R.S. [ANATECH (United States); Demma, A. [Electric Power Research Institute - EPRI (United States)

    2011-07-01

    Demonstration of component functionality requires analytical simulations of reactor internals behavior. Towards that aim, EPRI has undertaken the development of irradiated material constitutive model and damage criteria for use in global and local finite-element based functionality analysis methodology. The constitutive behavioral regimes of irradiated stainless steel types 316 and 304 materials included in the model consist of: elastic-plastic material response considering irradiation hardening of the stress-strain curve, irradiation creep, stress relaxation, and void swelling. IASCC and degradation of ductility with irradiation are the primary damage mechanisms considered in the model. The material behavior model development consists of two parts: the first part is a user-material subroutine that can interface with a general-purpose finite element computer program to adapt it to the special-purpose of functionality analysis of reactor internals. The second part is a user utility in the form of Excel Spread sheets that permit users to extract a given property, e.g. the elastic-plastic stress-strain curve, creep curve, or void-swelling curve, as function of the relevant independent variables. The development of the model takes full advantage of the significant work that has been undertaken within EPRI's Material Reliability Program (MRP) to improve the knowledge of the material properties of irradiated stainless steels. Data from EPRI's MRP database have been utilized to develop equations that characterize the yield strength, ultimate tensile strength, uniform elongation, total elongation, reduction in area, void swelling and irradiation creep of stainless steels in a PWR environment. It is noted that, while the development of the model's equations has been statistically faithful to the material database, approximations were introduced in the model to ensure appropriate conservatism in the model's application consistently with accepted

  11. Vibration monitoring of the mechanical behavior of the internal structures of PWR reactors

    International Nuclear Information System (INIS)

    Assedo, R.; Carre, J.C.; Sol, J.C.

    1979-01-01

    The internal structures of pressurized water reactors are the seat of vibrations induced by fluctuations in primary fluid flow. A knowledge of these phenomena is indispensable in order to ensure that the structures are in proper mechanical order. It can also be used for operational monitoring. This paper describes all the methods developed and the results already achieved in this domain. The first part deals with tests on mockup associated with the calculation models which afforded a good knowledge of the vibrational characteristics of the internal structures, as well as the measurements made during hot tests of certain reactors which made it possible to qualify these models on real structures. The second part describes the means of detection (neutron noise, external accelerometers) as well as the processing methods used in the follow-up. A few typical results obtained on site are then presented. Finally, the general principles of operational monitoring of the mechanical behavior of the internal structures are described [fr

  12. Reactor internals production under ideal conditions at Pensacola. [PWR type reactors

    Energy Technology Data Exchange (ETDEWEB)

    1975-12-01

    The Westinghouse factory at Pensacola, Florida, which specialises in the production of pressure vessel internal components for PWRs, is described. Its excellent manufacturing and inspection facilities, supported by careful attention to staff training and motivation, are responsible for the extremely high level of quality and continual improvement in productivity.

  13. Aging considerations for PWR [pressurized water reactor] control rod drive mechanisms and reactor internals

    International Nuclear Information System (INIS)

    Ware, A.G.

    1988-01-01

    This paper describes age-related degradation mechanisms affecting life extension of pressurized water reactor control rod drive mechanisms and reactor internals. The major sources of age-related degradation for control rod drive mechanisms are thermal transients such as plant heatups and cooldowns, latchings and unlatchings, long-term aging effects on electrical insulation, and the high temperature corrosive environment. Flow induced loads, the high-temperature corrosive environment, radiation exposure, and high tensile stresses in bolts all contribute to aging related degradation of reactor internals. Another problem has been wear and fretting of instrument guide tubes. The paper also discusses age-related failures that have occurred to date in pressurized water reactors

  14. Establishing experimental model of human internal carotid artery siphon segment in canine common carotid artery

    International Nuclear Information System (INIS)

    Cui Xuee; Li Minghua; Wang Yongli; Cheng Yingsheng; Li Wenbin

    2005-01-01

    Objective: To study the feasibility of establishing experimental model of human internal carotid artery siphon segment in canine common carotid artery (CCA) by end-to-end anastomoses of one side common carotid artery segment with the other side common carotid artery. Methods: Surgical techniques were used to make siphon model in 8 canines. One side CCA was taken as the parent artery and anastomosing with the cut off contra-lateral CCA segment which has passed through within the S-shaped glass tube. Two weeks after the creation of models angiography showed the model siphons were patent. Results: Experimental models of human internal carotid artery siphon segment were successfully made in all 8 dogs. Conclusions: It is practically feasible to establish experimental canine common carotid artery models of siphon segment simulating human internal carotid artery. (authors)

  15. Occupational radiation exposure in PWR: International comparison of some global indicators between 1975 and 1985

    International Nuclear Information System (INIS)

    Lochard, J.; Benedittini, M.

    1987-09-01

    This report presents the main results of an international comparative study of occupational radiation exposure in Pressurised Water Reactors (PWRs). The comparison is based on some synthetic indicators concerning both collective and mean individual exposures assessed for the following countries: Belgium, United-States, France, Japan, Federal Republic of Germany, Sweden and Switzerland. Information has been gained from the published literature and when it was possible, through direct correspondence with power station operators or national regulatory authorities. It concerns 120 reactors totalizing more than 900 reactor operating years. For the comparison, only reactors which were installed after 1974 have been considered, in order to have more homogeneous data representative of modern operating plants. Indicators calculated for the comparison are the collective and mean individual doses per reactor expressed either on a calendar year basis (from 1975 to 1985) or on a number of operating year basis (up to 11 years) [fr

  16. International asset pricing under segmentation and PPP deviations

    NARCIS (Netherlands)

    Chaieb, I.; Errunza, V.

    2007-01-01

    We analyze the impact of both purchasing power parity (PPP) deviations and market segmentation on asset pricing and investor's portfolio holdings. The freely traded securities command a world market risk premium and an inflation risk premium. The securities that can be held by only a subset of

  17. Malfunction tests and vibration analysis of P.W.R. internal structures

    International Nuclear Information System (INIS)

    Puyal, C.; Carre, J.C.; Epstein, A.

    1987-01-01

    To diagnose changes liable to occur in the vibration behavior of internals, it is important to understand the influence of changes in the mechanical properties of elements on the output signals obtained from neutron chambers placed out of core and accelerometers fixed to the reactor vessel. To do this, the effects of changes liable to occur in the hold-down springs and the flexures were simulated on the SAFRAN loop, using a representative hydroelastic mock-up. The results obtained experimentally on SAFRAN for different characteristics of the hold-down spring, which lies between the upper part of the core barrel and the vessel head, have been published. In this paper, we propose to present the results of the investigation of the fracture of one or more flexures which connect the cylindrical thermal shield to the core barrel. This work is in two parts: a) Computation based on a hydroelastic model using the substructuration computer program TRISTANA of the CASTEM system. b) Tests simulating flexure fracture: 1 - in air, for an understanding of the mechanisms involved; 2 - on the SAFRAN loop with a representative flow in order to estimate the strains liable to exist on the vibration signatures recorded on displacement transducers and accelerometers. Good agreement was observed between the computation results with the theoretical model employed and those obtained experimentally [fr

  18. Internal Prosthetic Replacement of Skeletal Segments Lost in Combat Injuries.

    Science.gov (United States)

    1973-08-31

    osteo- articular bone grafts. Clin. Ortho., 87: 156, 1972. 8. Tuli, S. M.: Bridging of bone defects by massive bone grafts in tumorous conditions. Clin...fashion in its proximal one-third to "prevent distractic ,n of the fragments. The fiber metal segment was then placed in the appropriate defect and the...defect slightly oversized and also osteotomizing the fibula to delete any possible distracting forces or angulating forces. The only complication in

  19. Reduction of residual stresses in internal skin of transient zones of PWR steam generator expanded tubes: tests with a ''rotating brush''

    International Nuclear Information System (INIS)

    Vidal, P.

    1984-04-01

    A process aiming at preventing or suppressing cracks under stress corrosion on the primary side in the expanded zones of PWR steam generator tubes has been studied; it consists in hammering the internal skin of tubes in these zones what reduces the level of residual expanding stresses to lower values around 100-150 MPa without modifying the stress level in external skin. Tests in magnesium chloride to estimate the residual stresses of tubes in low carbon stainless austenitic steel 18% Cr-12% Ni with molybdene [fr

  20. Dynamical analysis of a PWR internals using super-elements in an integrated 3-D model model. Part 2: dynamical tests and seismic analysis

    International Nuclear Information System (INIS)

    Jesus Miranda, C.A. de.

    1992-01-01

    The results of the test analysis (frequencies) for the isolated super-elements and for the developed 3-D model of the internals core support structures of a PWR research reactor are presented. Once certified of the model effectiveness for this type of analysis the seismic spectral analysis was performed. From the results can be seen that the structures are rigid for this load, isolated or together with the other in the 3-D model, and there are no impacts among them during the earthquake (OBE). (author)

  1. ROX PWR

    International Nuclear Information System (INIS)

    Akie, H.; Yamashita, T.; Shirasu, N.; Takano, H.; Anoda, Y.; Kimura, H.

    1999-01-01

    For an efficient burnup of excess plutonium from nuclear reactors spent fuels and dismantled warheads, plutonium rock-like oxide(ROX) fuel has been investigated. The ROX fuel is expected to provide high Pu transmutation capability, irradiation stability and chemical and geological stability. While, a zirconia-based ROX(Zr-ROX)-fueled PWR core has some problems of Doppler reactivity coefficient and power peaking factor. For the improvement of these characteristics, two approaches were considered: the additives such as UO 2 , ThO 2 and Er 2 O 3 , and a heterogeneous core with Zr-ROX and UO 2 assemblies. As a result, the additives UO 2 + Er 2 O 3 are found to sufficiently improve the reactivity coefficients and accident behavior, and to flatten power distribution. On the other hand, in the 1/3Zr-ROX + 2/3UO 2 heterogeneous core, further reduction of power peaking seems necessary. (author)

  2. Metallurgical examinations update of baffle bolts removed from operating French PWR. Microstructural investigations of a baffle to former bolt located on a high level of the internal structures

    International Nuclear Information System (INIS)

    Panait, C.; Fargeas, E.; Miloudi, S.; Moulart, P.; Tommy-Martin, M.; Monteil, N.; Pokor, C.

    2015-01-01

    This paper presents the microstructural investigations conducted on a cracked baffle to former bolt extracted from an upper former level of the internal structures of a French Pressurized Water Reactor (PWR). Extensive microstructural investigations using Light Microscopy, Scanning Electron Microscopy and Transmission Electron Microscopy (TEM) have been conducted to understand the degradation mechanisms of this bolt. TEM investigations have revealed neutron irradiation damage in the microstructure of the bolt such as Frank loops and cavities and/or bubbles. The number of features per unit volume as a function of diameter was determined in the head and in the shank of the bolt. The obtained results are relatively similar to those obtained for other damaged bolts extracted from PWR-type reactors and irradiated in similar conditions (dose and temperature). The irradiation damage has induced an evolution of the mechanical properties (hardening of the material), as revealed by the hardness measurements along the bolt, with a higher average value in the head (400 HV), compared to the shank (15 mm under the head), about 340 HV. The metallurgical investigations have confirmed that this bolt was damaged by Irradiation Assisted Stress Corrosion Cracking (IASCC)

  3. LOCA testing of high burnup PWR fuel in the HBWR. Additional PIE on the cladding of the segment 650-5

    Energy Technology Data Exchange (ETDEWEB)

    Oberlaender, B.C.; Espeland, M.; Jenssen, H.K.

    2008-07-01

    IFA-650.5, a test with pre-irradiated fuel in the Halden Project LOCA test series, was conducted on October 23rd, 2006. The fuel rod had been used in a commercial PWR and had a high burnup, 83 MWd/kgU. Experimental arrangements of the fifth test were similar to the preceding LOCA tests. The peak cladding temperature (PCT) level was higher than in the third and fourth tests, 1050 C. A peak temperature close to the target was achieved and cladding burst occurred at approx. 750 C. Within the joint programme framework of the Halden Project PIE was done, consisting of gamma scanning, visual inspection, neutron-radiography, hydrogen analysis and metallography / ceramography. An additional extensive PIE including metallography, hydrogen analysis, and hardness measurements of cross-sections at seven axial elevations was done. It was completed to study the high burnup and LOCA induced effects on the Zr-4 cladding, namely the migration of oxygen into the cladding from the inside surface, the cladding distension, and the burst (author)(tk)

  4. Dynamical analysis of a PWR internals using super-elements in an integrated 3-D model model. Part 1: model description and static tests

    International Nuclear Information System (INIS)

    Jesus Miranda, C.A. de.

    1992-01-01

    An integrated 3-D model of a research PWR reactor core support internals structures was developed for its dynamic analyses. The static tests for the validation of the model are presented. There are about 90 super-elements with, approximately, 85000 degrees of freedom (DoF), 8200 masters DoF, 12000 elements with about 8400 thin shell elements. A DEC VAX computer 11/785 model and the ANSYS program were used. If impacts occurs the spectral seismic analysis will be changed to a non-linear one with direct integration of the displacement pulse derived from the seismic accelerogram. This last will be obtained from the seismic acceleration response spectra. (author)

  5. Novelty detection-based internal fingerprint segmentation in optical coherence tomography images

    CSIR Research Space (South Africa)

    Khutlang, Rethabile

    2017-08-01

    Full Text Available present an automatic segmentation of the papillary layer method, from images acquired using contact-less 3-D swept source optical coherence tomography (OCT). The papillary contour represents the internal fingerprint, which does not suffer from the external...

  6. Novelty detection-based internal fingerprint segmentation in optical coherence tomography images

    CSIR Research Space (South Africa)

    Khutlang, R

    2014-12-01

    Full Text Available present an automatic segmentation of the papillary layer method, in 3-D swept source optical coherence tomography (SS-OCT) images. The papillary contour represents the internal fingerprint, which does not suffer external skin problems. The slices composing...

  7. ROX PWR

    Energy Technology Data Exchange (ETDEWEB)

    Akie, H.; Yamashita, T.; Shirasu, N.; Takano, H.; Anoda, Y.; Kimura, H. [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1999-12-01

    For an efficient burnup of excess plutonium from nuclear reactors spent fuels and dismantled warheads, plutonium rock-like oxide(ROX) fuel has been investigated. The ROX fuel is expected to provide high Pu transmutation capability, irradiation stability and chemical and geological stability. While, a zirconia-based ROX(Zr-ROX)-fueled PWR core has some problems of Doppler reactivity coefficient and power peaking factor. For the improvement of these characteristics, two approaches were considered: the additives such as UO{sub 2}, ThO{sub 2} and Er{sub 2}O{sub 3}, and a heterogeneous core with Zr-ROX and UO{sub 2} assemblies. As a result, the additives UO{sub 2}+ Er{sub 2}O{sub 3} are found to sufficiently improve the reactivity coefficients and accident behavior, and to flatten power distribution. On the other hand, in the 1/3Zr-ROX + 2/3UO{sub 2} heterogeneous core, further reduction of power peaking seems necessary. (author)

  8. Westinghouse experience in using mechanical cutting for reactor vessel internals segmentation

    International Nuclear Information System (INIS)

    Boucau, Joseph; Fallstroem, Stefan; Segerud, Per; Kreitman, Paul J.

    2010-01-01

    Some commercial nuclear power plants have been permanently shut down to date and decommissioned using dismantling methods. Other operating plants have decided to undergo an upgrade process that includes replacement of reactor internals. In both cases, there is a need to perform a segmentation of the reactor vessel internals with proven methods for long term waste disposal. Westinghouse has developed several concepts to dismantle reactor internals based on safe and reliable techniques. Mechanical cutting has been used by Westinghouse since 1999 for both PWRs and BWRs and its process has been continuously improved over the years. Detailed planning is essential to a successful project, and typically a 'Segmentation and Packaging Plan' is prepared to document the effort. The usual method is to start at the end of the process, by evaluating the waste disposal requirements imposed by the waste disposal agency, what type and size of containers are available for the different disposal options, and working backwards to select the best cutting tools and finally the cut geometry required. These plans are made utilizing advanced 3-D CAD software to model the process. Another area where the modelling has proven invaluable is in determining the logistics of component placement and movement in the reactor cavity, which is typically very congested when all the internals are out of the reactor vessel in various stages of segmentation. The main objective of the segmentation and packaging plan is to determine the strategy for separating the highly activated components from the less activated material, so that they can be disposed of in the most cost effective manner. Usually, highly activated components cannot be shipped off-site, so they must be packaged such that they can be dry stored with the spent fuel in an Independent Spent Fuel Storage Installation (ISFSI). Less activated components can be shipped to an off-site disposal site depending on space availability. Several of the

  9. Corrosion of PWR steam generators

    International Nuclear Information System (INIS)

    Garnsey, R.

    1979-01-01

    Some designs of pressurized water reactor (PWR) steam generators have experienced a variety of corrosion problems which include stress corrosion cracking, tube thinning, pitting, fatigue, erosion-corrosion and support plate corrosion resulting in 'denting'. Large international research programmes have been mounted to investigate the phenomena. The operational experience is reviewed and mechanisms which have been proposed to explain the corrosion damage are presented. The implications for design development and for boiler and feedwater control are discussed. (author)

  10. Maturity of the PWR

    International Nuclear Information System (INIS)

    Bacher, P.; Rapin, M.; Aboudarham, L.; Bitsch, D.

    1983-03-01

    Figures illustrating the predominant position of the PWR system are presented. The question is whether on the basis of these figures the PWR can be considered to have reached maturity. The following analysis, based on the French program experience, is an attempt to pinpoint those areas in which industrial maturity of the PWR has been attained, and in which areas a certain evolution can still be expected to take place

  11. Process and apparatus for adjusting a new upper reactor internals in a reactor vessel of a PWR

    International Nuclear Information System (INIS)

    Frizot, A.; Cadaureille, G.; Lalere, C.; Machuron, J.Y.

    1987-01-01

    On the new upper reactor internals is mounted devices for alignment and clearances, before introducing in the reactor vessel. After introducing alignment and clearances are measured. Adjustment pieces are provided for optimum clearances and alignment and fixed after removal from vessel. Decontamination is made by using water jets prior to fitting recess parts [fr

  12. A complex study on the reliability assessment of the containment of a PWR. Part III.- Structural reliability assessment under internal and external loading conditions

    International Nuclear Information System (INIS)

    Bauer, J.; Schueller, G.I.

    1977-01-01

    The first part of the analysis is concerned with the determination of the failure probability of the steel hull under internal load conditions. Two independent failure criteria are the basis for this calculation; the first one being the ultimate yield which is actually an instability condition and the second one being the fracture condition as described in Part II of the paper. Both the global and the local failure probabilities are investigated. The second part of the analysis is concerned with the external load case of earthquake. As it has already been described in Part I the probability of occurrence of a LOCA, given an earthquake has been considered in connection with the probable damage which the steel hull might experience during the earthquake. In other words the survival probability of the hull with deteriorated resistance is calculated, taking into account the frequencies of occurrence of the various events. The third part of the analysis is concerned with the reliability determination of the reinforced concrete dome structure, which is supposed to protect, the steel hull against external load conditions such as airplane crash and external pressure waves (the latter covering the load case of tornado occurrence). The reliability analysis of the reinforced concrete structure under earthquake loading is performed by utilizing the time-history method. Some aspects of the drawbacks of the response spectra method -when used in a risk analysis- are pointed out. The probability distribution of the concrete strength as determined under intermediate strain rate as described in Part II is utilized in the analysis. Finally the remaining two external load cases are discussed in light of their use in a reliability analysis and with respect to their frequency of occurrence and the probability distribution of their load intensities. The reliability demonstration is performed using the containment structure of the PWR-plant 'Biblis B' which is locate

  13. Investigation of the internal behavior in segmented PEMFCs of different flow fields during cold start process

    International Nuclear Information System (INIS)

    Lin, R.; Ren, Y.S.; Lin, X.W.; Jiang, Z.H.; Yang, Z.; Chang, Y.T.

    2017-01-01

    In this study, we have researched the internal behavior in segmented proton exchange membrane fuel cells (PEMFCs) with three different flow fields during cold start process. The change of internal current density and temperature in fuel cells with different flow fields could be obviously shown by the printed circuit board (PCB) technology, and the study shows that the flow field is significant for enhancing the cold start ability and durability. Single serpentine flow field has the best cold start performance, while triple channel serpentine flow field has the best uniformity. It is found that without a robust temperature rising tendency, the cell temperature reaching 0 °C does not definitely mean a successful cold start because the cell temperature might drop down 0 °C again. Polarization curves show that there is almost no performance degradation after successful cold start, but the cell degrades quickly after the failed cold start at −7 °C and −10 °C. Based on these characteristics, we optimized the rapid cold start strategy by using electric heating and make it possible to start up the PEMFC at temperatures down to −20 °C within about 11 min. - Highlights: • Segmented fuel cell were used to record the internal current density and temperature distributions during the cold start. • The effects of flow fields on the PEMFC cold start capacity were evaluated. • The effect of cold start on the performance of fuel cell was evaluated. • An optimized strategy was adopted to improve the cold start capacity.

  14. Performance assessment of the commercial CFD software for the prediction of the PWR internal flow - Corrected version

    International Nuclear Information System (INIS)

    Lee, Gong Hee; Bang, Young Seok; Woo, Sweng Woong; Cheong, Ae Ju; Kim, Do Hyeong; Kang, Min Ku

    2013-01-01

    As the computer hardware technology develops the license applicants for nuclear power plant use the commercial CFD software with the aim of reducing the excessive conservatism associated with using simplified and conservative analysis tools. Even if some of CFD software developers and its users think that a state of the art CFD software can be used to solve reasonably at least the single-phase nuclear reactor safety problems there is still the limitations and the uncertainties in the calculation result. From a regulatory perspective, Korea Institute of Nuclear Safety (KINS) has been presently conducting the performance assessment of the commercial CFD software for the nuclear reactor safety problems. In this study, in order to examine the prediction performance of the commercial CFD software with the porous model in the analysis of the scale-down APR+ (Advanced Power Reactor Plus) internal flow, simulation was conducted with the on-board numerical models in ANSYS CFX R.14 and FLUENT R.14. It was concluded that depending on the CFD software the internal flow distribution of the scale-down APR+ was locally some-what different. Although there was a limitation in estimating the prediction performance of the commercial CFD software due to the limited number of the measured data, CFXR.14 showed the more reasonable predicted results in comparison with FLUENT R.14. Meanwhile, due to the difference of discretization methodology, FLUENT R.14 required more computational memory than CFX R.14 for the same grid system. Therefore the CFD software suitable to the available computational resource should be selected for the massive parallel computation. (authors)

  15. Assessment and management of ageing of major nuclear power plant components important to safety: PWR vessel internals

    International Nuclear Information System (INIS)

    1999-10-01

    components addressed in the reports. This report addresses the pressurized water reactor vessel internals (taken as a single component). The IAEA acknowledges the work of all contributors to drafting and review of this report

  16. The PWR cores management

    International Nuclear Information System (INIS)

    Barral, J.C.; Rippert, D.; Johner, J.

    2000-01-01

    During the meeting of the 25 january 2000, organized by the SFEN, scientists and plant operators in the domain of the PWR debated on the PWR cores management. The five first papers propose general and economic information on the PWR and also the fast neutron reactors chains in the electric power market: statistics on the electric power industry, nuclear plant unit management, the ITER project and the future of the thermonuclear fusion, the treasurer's and chairman's reports. A second part offers more technical papers concerning the PWR cores management: performance and optimization, in service load planning, the cores management in the other countries, impacts on the research and development programs. (A.L.B.)

  17. Clinical value of MSCTA in the interventional treatment of the initial origin stenotic segment of the internal carotid artery

    International Nuclear Information System (INIS)

    Qi Yueyong; Zou Liguang; Chen Lin; Sun Qingrong; Shuai Jie; Zhou Zheng; Huang Lan

    2007-01-01

    Objective: To assess the clinical value of MSCTA in the interventional treatment of the initial origin stenotic segment of internal carotid artery. Methods: Forty two patients with stenosis of initial origin stenotic segment of internal carotid artery underwent interventional treatment and MSCTA were analyzed retrospectively. Results: Forty two patients were diagnosed correctly through MSCTA. The percentages of stenotic area were measured from the multiplanar reconstruction (MPR)images of MSCTA, including mild stenosis( 70%)in 30, obstruction in 4 (>100%)and normal in 18. Plaques and endoscopic views of stenosis were delineated on MSCTA and CTVE. Conclusion: MSCTA is an accurate method for the assessment of the stenosis and plaques of the stenotic origin segment of internal carotid artery. MSCTA can be used as a convenient follow-up modality for instent restenosis. (authors)

  18. Reliability of PWR type nuclear power plants

    International Nuclear Information System (INIS)

    Ribeiro, A.A.T.; Muniz, A.A.

    1978-12-01

    Results of the analysis of factors influencing the reliability of international nuclear power plants of the PWR type are presented. The reliability factor is estimated and the probability of its having lower values than a certain specified value is discussed. (Author) [pt

  19. Draft I.E.C. standard for monitoring PWR internal structures; Projet de norme C.E.I. pour la surveillance des structures internes des REP

    Energy Technology Data Exchange (ETDEWEB)

    Trenty, A.

    1994-06-01

    EDF has proposed to the International Electrotechnical Commission a draft standard for monitoring the vessel internal structures of PWRs. The standard applies to systems used for monitoring the vibratory behavior of the internal structures of PWRs (core barrel, thermal shield, fuel assemblies) on the basis of neutron fluctuations observed outside the vessel as well as of vessel vibrations. It covers the systems characteristics and the monitoring procedures. It should facilitate standardization of monitoring and comparisons on an international level. This paper presents the main features of the draft standard: -principles of measurement: correlation between movements of internals and ex core neutron noise on the one hand, forced vibrations of the vessel on the other hand; -sampling and conditioning of the signals; -monitoring equipment and in particular spectral analysis device; -functions of the monitoring software used for spectral analysis, peak detection and calculation of structure displacement; -studies preliminary to setting up the monitoring (calculation of internal vibratory modes, defect simulation on mockup, qualification on reactor during hot test...); -monitoring procedures (periodicity of analysis and what to do in case of anomaly); -documentation necessary to the monitoring. A diagnostic procedure is given as an example. The draft standard, written in 1994, will be presented in Frankfurt (Germany) in February 1995. (author). 1 annexe.

  20. Photoreceptor Outer Segment on Internal Limiting Membrane after Macular Hole Surgery: Implications for Pathogenesis.

    Science.gov (United States)

    Grinton, Michael E; Sandinha, Maria T; Steel, David H W

    2015-01-01

    This report presents a case, which highlights key principles in the pathophysiology of macular holes. It has been hypothesized that anteroposterior (AP) and tangential vitreous traction on the fovea are the primary underlying factors causing macular holes [Nischal and Pearson; in Kanski and Bowling: Clinical Ophthalmology: A Systemic Approach, 2011, pp 629-631]. Spectral domain optical coherence tomography (OCT) has subsequently corroborated this theory in part but shown that AP vitreofoveal traction is the more common scenario [Steel and Lotery: Eye 2013;27:1-21]. This study was conducted as a single case report. A 63-year old female presented to her optician with blurred and distorted vision in her left eye. OCT showed a macular hole with a minimum linear diameter of 370 µm, with persistent broad vitreofoveal attachment on both sides of the hole edges. The patient underwent combined left phacoemulsification and pars plana vitrectomy, internal limiting membrane (ILM) peel and gas injection. The ILM was examined by electron microscopy and showed the presence of a cone outer segment on the retinal side. Post-operative OCT at 11 weeks showed a closed hole with recovery of the foveal contour and good vision. Our case shows the presence of a photoreceptor outer segment on the retinal side of the ILM and reinforces the importance of tangential traction in the development of some macula holes. The case highlights the theory of transmission of inner retinal forces to the photoreceptors via Müller cells and how a full thickness macular hole defect can occur in the absence of AP vitreomacular traction.

  1. Surveillance of vibrations in PWR

    International Nuclear Information System (INIS)

    Espefaelt, R.; Lorenzen, J.; Aakerhielm, F.

    1980-07-01

    The core of a PWR - including fuel elements, internal structure, control rods and core support structure inside the pressure vessel - is subjected to forces which can cause vibrations. One sensitive means to detect and analyse such vibrations is by means of the noise from incore and excore neutron detector signals. In this project noise recordings have been made on two occasions in the Ringhals 2 plant and the obtained data been analysed using the Studsvik Noise Analysis Program System (SNAPS). The results have been intepreted and a detailed description of the vibrational status of the core and pressure vessel internals has been produced. On the basis of the obtained results it is proposed that neutron signal noise analysis should be performed at each PWR plant in the beginning, middle and end of each fuel cycle and an analysis be made using the methods developed in the project. It would also provide a contribution to a higher degree of preparedness for diagnostic tasks in case of unexpected and abnormal events. (author)

  2. PWR core design calculations

    International Nuclear Information System (INIS)

    Trkov, A.; Ravnik, M.; Zeleznik, N.

    1992-01-01

    Functional description of the programme package Cord-2 for PWR core design calculations is presented. Programme package is briefly described. Use of the package and calculational procedures for typical core design problems are treated. Comparison of main results with experimental values is presented as part of the verification process. (author) [sl

  3. Next generation PWR

    International Nuclear Information System (INIS)

    Tanaka, Toshihiko; Fukuda, Toshihiko; Usui, Shuji

    2001-01-01

    Development of LWR for power generation in Japan has been intended to upgrade its reliability, safety, operability, maintenance and economy as well as to increase its capacity in order, since nuclear power generation for commercial use was begun on 1970, to steadily increase its generation power. And, in Japan, ABWR (advanced BWR) of the most promising LWR in the world, was already used actually and APWR (advanced PWR) with the largest output in the world is also at a step of its actual use. And, development of the APWR in Japan was begun on 1980s, and is at a step of plan on construction of its first machine at early of this century. However, by large change of social affairs, economy of nuclear power generation is extremely required, to be positioned at an APWR improved development reactor promoted by collaboration of five PWR generation companies and the Mitsubishi Electric Co., Ltd. Therefore, on its development, investigation on effect of change in social affairs on nuclear power stations was at first carried out, to establish a design requirement for the next generation PWR. Here were described on outline, reactor core design, safety concept, and safety evaluation of APWR+ and development of an innovative PWR. (G.K.)

  4. Dissolution experiments of commercial PWR (52 MWd/kgU) and BWR (53 MWd/kgU) spent nuclear fuel cladded segments in bicarbonate water under oxidizing conditions. Experimental determination of matrix and instant release fraction

    Science.gov (United States)

    González-Robles, E.; Serrano-Purroy, D.; Sureda, R.; Casas, I.; de Pablo, J.

    2015-10-01

    The denominated instant release fraction (IRF) is considered in performance assessment (PA) exercises to govern the dose that could arise from the repository. A conservative definition of IRF comprises the total inventory of radionuclides located in the gap, fractures, and the grain boundaries and, if present, in the high burn-up structure (HBS). The values calculated from this theoretical approach correspond to an upper limit that likely does not correspond to what it will be expected to be instantaneously released in the real system. Trying to ascertain this IRF from an experimental point of view, static leaching experiments have been carried out with two commercial UO2 spent nuclear fuels (SNF): one from a pressurized water reactor (PWR), labelled PWR, with an average burn-up (BU) of 52 MWd/kgU and fission gas release (FGR) of 23.1%, and one from a boiling water reactor (BWR), labelled BWR, with an average BU of and 53 MWd/kgU and FGR of 3.9%. One sample of each SNF, consisting of fuel and cladding, has been leached in bicarbonate water during one year under oxidizing conditions at room temperature (25 ± 5)°C. The behaviour of the concentration measured in solution can be divided in two according to the release rate. All radionuclides presented an initial release rate that after some days levels down to a slower second one, which remains constant until the end of the experiment. Cumulative fraction of inventory in aqueous phase (FIAPc) values has been calculated. Results show faster release in the case of the PWR SNF. In both cases Np, Pu, Am, Cm, Y, Tc, La and Nd dissolve congruently with U, while dissolution of Zr, Ru and Rh is slower. Rb, Sr, Cs and Mo, dissolve faster than U. The IRF of Cs at 10 and 200 days has been calculated, being (3.10 ± 0.62) and (3.66 ± 0.73) for PWR fuel, and (0.35 ± 0.07) and (0.51 ± 0.10) for BWR fuel.

  5. Scaling studies - PWR

    International Nuclear Information System (INIS)

    Sonneck, G.

    1983-05-01

    A RELAP 4/MOD 6 study was made based on the blowdown phase of the intermediate break experiment LOFT L5-1. The method was to set up a base model and to vary parametrically some areas where it is known or suspected that LOFT differs from a commercial PWR. The aim was not to simulate LOFT or a PWR exactly but to understand the influence of the following parameters on the thermohydraulic behaviour of the system and the clad temperature: stored heat in the downcomer (LOFT has rather large filler blocks in this part of the pressure vessel); bypass between downcomer and upper plenum; and core length. The results show that LOFT is prototypical for all calculated blowdowns. As the clad temperatures decrease with decreasing stored energy in the downcomer, increased bypass and increased core length, LOFT results seem to be realistic as long as realistic bypass sizes are considered; they are conservative in the two other areas. (author)

  6. Plutonium recycling in PWR

    International Nuclear Information System (INIS)

    Youinou, G.; Girieud, R.; Guigon, B.

    2000-01-01

    Two concepts of 100% MOX PWR cores are presented. They are designed such as to minimize the consequences of the introduction of Pu on the core control. The first one has a high moderation ratio and the second one utilizes an enriched uranium support. The important design parameters as well as their capabilities to multi recycle Pu are discussed. We conclude with the potential interest of the two concepts. (author)

  7. The integrated PWR

    International Nuclear Information System (INIS)

    Gautier, G.M.

    2002-01-01

    This document presents the integrated reactors concepts by a presentation of four reactors: PIUS, SIR, IRIS and CAREM. The core conception, the operating, the safety, the economical aspects and the possible users are detailed. From the performance of the classical integrated PWR, the necessity of new innovative fuels utilization, the research of a simplified design to make easier the safety and the KWh cost decrease, a new integrated reactor is presented: SCAR 600. (A.L.B.)

  8. Irradiation temperature memorization by retention of krypton-85. Application to the temperature determination for the internal cladding surface of fuel elements in PWR

    International Nuclear Information System (INIS)

    Fremiot, Claude

    1977-01-01

    The temperature of the inner surface of the cladding fuel elements, which can not be measured directly, can be determined after irradiation. During its stage within the reactor, the cladding is bombarded by krypton-85 fission product, which is trapped in the metallic lattice defects. The experience shows that the krypton release during postirradiation heating takes place at the irradiation temperature. This method was applied for PWR fuel element. A very simple model for retention and release of the krypton is proposed. The krypton trap-energy in zircaloy partakes in this model. This technique can be ordered amongst the Hot'Lab' control methods and expert appraisements. It is pointed out that the principal interest in that method is the fact that it does not need any fuel element instrumentation. At the present, this method is being used by CEA for routine-control. [fr

  9. Reactor control system. PWR

    International Nuclear Information System (INIS)

    2009-01-01

    At present, 23 units of PWR type reactors have been operated in Japan since the start of Mihama Unit 1 operation in 1970 and various improvements have been made to upgrade operability of power stations as well as reliability and safety of power plants. As the share of nuclear power increases, further improvements of operating performance such as load following capability will be requested for power stations with more reliable and safer operation. This article outlined the reactor control system of PWR type reactors and described the control performance of power plants realized with those systems. The PWR control system is characterized that the turbine power is automatic or manually controlled with request of the electric power system and then the nuclear power is followingly controlled with the change of core reactivity. The system mainly consists of reactor automatic control system (control rod control system), pressurizer pressure control system, pressurizer water level control system, steam generator water level control system and turbine bypass control system. (T. Tanaka)

  10. AGR v PWR

    International Nuclear Information System (INIS)

    Green, D.

    1986-01-01

    When the Central Electricity Generating Board (CEGB) invited tenders and placed a contract for the Advanced Gas Cooled Reactor (AGR) at Dungeness B in 1965 -preferring it to the Pressurised Water Reactor (PWR) -the AGR was lamentably ill developed. The effects of the decision were widely felt, for it took the British nuclear industry off the light water reactor highway of world reactor business and up and idiosyncratic private highway of its own, excluding it altogether from any material export business in the two decades which followed. Yet although the UK may have made wrong decisions in rejecting the PWR in 1965, that does not mean that it can necessarily now either correct them, or redeem their consequence, by reversing the choice in 1985. In the 20 years since 1965 the whole world economic and energy picture has been transformed and the national picture with it. Picking up the PWR now could prove as big a disaster as rejecting it may have been in 1965. (author)

  11. Water chemistry in PWR

    International Nuclear Information System (INIS)

    Abe, Kenji

    1987-01-01

    This article outlines major features and basic concept of the secondary system of PWR's and water properties control measures adopted in recent PWR plants. The secondary system of a PWR consists of a condenser cooling pipe (aluminum-brass, titanium, or stainless steel), low-pressure make-up water heating pipe (aluminum-brass or stainless steel), high-ressure make-up water heating pipe (cupro-nickel or stainless steel), steam generator heat-transfer pipe (Inconel 600 or 690), and bleed/drain pipe (carbon steel, low alloy steel or stainless steel). Other major pipes and equipment are made of carbon steel or stainless steel. Major troubles likely to be caused by water in the secondary system include reduction in wall thickness of the heat-transfer pipe, stress corrosion cracking in the heat-transfer pipe, and denting. All of these are caused by local corrosion due to concentration of purities contained in water. For controlling the water properties in the secondary system, it is necessary to prevent impurities from entering the system, to remove impurities and corrosion products from the system, and to prevent corrosion of apparatus making up the system. Measures widely adopted for controlling the formation of IGA include the addition of boric acid for decreasing the concentration of free alkali and high hydrazine operation for providing a highly reducing atmospere. (Nogami, K.)

  12. PWR: 10 years after and perspectives

    International Nuclear Information System (INIS)

    1990-01-01

    These proceedings of the SFEN days on PWR (Ten years after and perspectives) comprise 13 conferences bearing on: - From the occurential approach to the state approach - Evolution of calculating tools - Human factors and safety - Reactor safety in the PWR 2000 - The PWR and the electrical power grid load follow - Fuel aspect of PWR management - PWR chemistry evolution - Balance of radiation protection - PWR modifications balance and influence on reactor operation - Design and maintenance of reactor components: 4 conferences [fr

  13. Intra-arterial high signals on arterial spin labeling perfusion images predict the occluded internal carotid artery segment

    International Nuclear Information System (INIS)

    Sogabe, Shu; Satomi, Junichiro; Tada, Yoshiteru; Kanematsu, Yasuhisa; Kuwayama, Kazuyuki; Yagi, Kenji; Yoshioka, Shotaro; Mizobuchi, Yoshifumi; Mure, Hideo; Yamaguchi, Izumi; Kitazato, Keiko T.; Nagahiro, Shinji; Abe, Takashi; Harada, Masafumi; Yamamoto, Nobuaki; Kaji, Ryuji

    2017-01-01

    Arterial spin labeling (ASL) involves perfusion imaging using the inverted magnetization of arterial water. If the arterial arrival times are longer than the post-labeling delay, labeled spins are visible on ASL images as bright, high intra-arterial signals (IASs); such signals were found within occluded vessels of patients with acute ischemic stroke. The identification of the occluded segment in the internal carotid artery (ICA) is crucial for endovascular treatment. We tested our hypothesis that high IASs on ASL images can predict the occluded segment. Our study included 13 patients with acute ICA occlusion who had undergone angiographic and ASL studies within 48 h of onset. We retrospectively identified the high IAS on ASL images and angiograms and recorded the occluded segment and the number of high IAS-positive slices on ASL images. The ICA segments were classified as cervical (C1), petrous (C2), cavernous (C3), and supraclinoid (C4). Of seven patients with intracranial ICA occlusion, five demonstrated high IASs at C1-C2, suggesting that high IASs could identify stagnant flow proximal to the occluded segment. Among six patients with extracranial ICA occlusion, five presented with high IASs at C3-C4, suggesting that signals could identify the collateral flow via the ophthalmic artery. None had high IASs at C1-C2. The mean number of high IAS-positive slices was significantly higher in patients with intra- than extracranial ICA occlusion. High IASs on ASL images can identify slow stagnant and collateral flow through the ophthalmic artery in patients with acute ICA occlusion and help to predict the occlusion site. (orig.)

  14. Intra-arterial high signals on arterial spin labeling perfusion images predict the occluded internal carotid artery segment

    Energy Technology Data Exchange (ETDEWEB)

    Sogabe, Shu; Satomi, Junichiro; Tada, Yoshiteru; Kanematsu, Yasuhisa; Kuwayama, Kazuyuki; Yagi, Kenji; Yoshioka, Shotaro; Mizobuchi, Yoshifumi; Mure, Hideo; Yamaguchi, Izumi; Kitazato, Keiko T.; Nagahiro, Shinji [Tokushima University Graduate School, Department of Neurosurgery, Tokushima (Japan); Abe, Takashi; Harada, Masafumi [Tokushima University Graduate School, Department of Radiology, Tokushima (Japan); Yamamoto, Nobuaki; Kaji, Ryuji [Tokushima University Graduate School, Department of Clinical Neurosciences, Institute of Biomedical Biosciences, Tokushima (Japan)

    2017-06-15

    Arterial spin labeling (ASL) involves perfusion imaging using the inverted magnetization of arterial water. If the arterial arrival times are longer than the post-labeling delay, labeled spins are visible on ASL images as bright, high intra-arterial signals (IASs); such signals were found within occluded vessels of patients with acute ischemic stroke. The identification of the occluded segment in the internal carotid artery (ICA) is crucial for endovascular treatment. We tested our hypothesis that high IASs on ASL images can predict the occluded segment. Our study included 13 patients with acute ICA occlusion who had undergone angiographic and ASL studies within 48 h of onset. We retrospectively identified the high IAS on ASL images and angiograms and recorded the occluded segment and the number of high IAS-positive slices on ASL images. The ICA segments were classified as cervical (C1), petrous (C2), cavernous (C3), and supraclinoid (C4). Of seven patients with intracranial ICA occlusion, five demonstrated high IASs at C1-C2, suggesting that high IASs could identify stagnant flow proximal to the occluded segment. Among six patients with extracranial ICA occlusion, five presented with high IASs at C3-C4, suggesting that signals could identify the collateral flow via the ophthalmic artery. None had high IASs at C1-C2. The mean number of high IAS-positive slices was significantly higher in patients with intra- than extracranial ICA occlusion. High IASs on ASL images can identify slow stagnant and collateral flow through the ophthalmic artery in patients with acute ICA occlusion and help to predict the occlusion site. (orig.)

  15. Segmentation of internal brain structures in three-dimensional nuclear magnetic resonance imaging

    International Nuclear Information System (INIS)

    Geraud, Th.

    1998-01-01

    For neurological studies, the in vivo aspect of imaging systems is very attractive. Brain images are currently a classical tool used in clinical routine and research. The most appropriate system to observe brain anatomy is tridimensional magnetic resonance imaging, and a major issue of image processing is to segment automatically cerebral structures. This is the scope of our thesis. The number of applications is steadily growing: morphometric measurements, pathology detection, surgery planning, getting a reference for functional studies,a and so forth. The use of pattern recognition to classify the different cerebral tissues from the only radiometric levels of the images is limited. Even supervised, these methods can not lead to distinguish easily several classes of grey matter. When these methods are automatic, their use has to be empirical in order to ensure robust results, and has to be restricted to regions of interest in order to get reliable results. As these methods do not fully respect the spatial consistency of classes in the images, we have introduced contextual information with the help of different formalisms. With Markovian regularization, we have shown that energetic terms of localization permit the separation of two grey classes: cortex and central nuclei. With mathematical morphology, we have proposed processing chains dedicated to several cerebral objects; in particular, brain segmentation is robust and reproducible, and we have successfully obtained individual markers for lateral ventricles, caudate nuclei, putamen and thalami. We have also proposed a contextual method to estimate pure tissue characteristics from a rough segmentation. Our main contribution has been to present a recognition method which is progressive and atlas guided. The originality of this method is manifold. At first, it takes into account structural information processed as flexible spatial constraints the formalism of which relies on fuzzy set theory and information fusion

  16. All Internal Segmental Bone Transport and Optional Lengthening With a Newly Developed Universal Cylinder-Kombi-Tube Module for Motorized Nails-Description of a Surgical Technique.

    Science.gov (United States)

    Krettek, Christian; El Naga, Ashraf

    2017-10-01

    Segmental transport is an effective method of treatment for segmental defects, but the need for external fixation during the transport phase is a disadvantage. To avoid external fixation, we have developed a Cylinder-Kombi-Tube Segmental Transport (CKTST) module for combination with a commercially available motorized lengthening nail. This CKTST module allows for an all-internal segmental bone transport and also allows for optional lengthening if needed. The concept and surgical technique of CKTST are described and illustrated with a clinical case.

  17. French PWR safety philosophy

    International Nuclear Information System (INIS)

    Conte, M.

    1986-05-01

    Increasing knowledge and lessons learned from starting and operating experience of French nuclear power plants, completed by the experience learned from the operation of foreign reactors, has contributed to the improvement of French PWR design and safety philosophy. Based on a deterministic approach, the French safety analysis was progressively completed by a probabilistic approach, each of them having possibilities and limits. As a consequence of the global risk objective set in 1977 for nuclear reactors, safety analysis was extended to the evaluation of events more complex than the conventional ones, and later to the evaluation of the feasibility of the offsite emergency plans in case of severe accidents

  18. PWR decontamination feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Silliman, P.L.

    1978-12-18

    The decontamination work which has been accomplished is reviewed and it is concluded that it is worthwhile to investigate further four methods for decontamination for future demonstration. These are: dilute chemical; single stage strong chemical; redox processes; and redox/chemical in combination. Laboratory work is recommended to define the agents and processes for demonstration and to determine the effect of the solvents on PWR materials. The feasibility of Indian Point 1 for decontamination demonstrations is discussed, and it is shown that the system components of Indian Point 1 are well suited for use in demonstrations.

  19. PWR decontamination feasibility study

    International Nuclear Information System (INIS)

    Silliman, P.L.

    1978-01-01

    The decontamination work which has been accomplished is reviewed and it is concluded that it is worthwhile to investigate further four methods for decontamination for future demonstration. These are: dilute chemical; single stage strong chemical; redox processes; and redox/chemical in combination. Laboratory work is recommended to define the agents and processes for demonstration and to determine the effect of the solvents on PWR materials. The feasibility of Indian Point 1 for decontamination demonstrations is discussed, and it is shown that the system components of Indian Point 1 are well suited for use in demonstrations

  20. PWR core design calculations

    Energy Technology Data Exchange (ETDEWEB)

    Trkov, A; Ravnik, M; Zeleznik, N [Inst. Jozef Stefan, Ljubljana (Slovenia)

    1992-07-01

    Functional description of the programme package Cord-2 for PWR core design calculations is presented. Programme package is briefly described. Use of the package and calculational procedures for typical core design problems are treated. Comparison of main results with experimental values is presented as part of the verification process. (author) [Slovenian] Opisali smo programski paket CORD-2, ki se uporablja pri projektnih izracunih sredice pri upravljanju tlacnovodnega reaktorja. Prikazana je uporaba paketa in racunskih postopkov za tipicne probleme, ki nastopajo pri projektiranju sredice. Primerjava glavnih rezultatov z eksperimentalnimi vrednostmi je predstavljena kot del preveritvenega procesa. (author)

  1. Using external and internal locking plates in a two-stage protocol for treatment of segmental tibial fractures.

    Science.gov (United States)

    Ma, Ching-Hou; Tu, Yuan-Kun; Yeh, Jih-Hsi; Yang, Shih-Chieh; Wu, Chin-Hsien

    2011-09-01

    The tibial segmental fractures usually follow high-energy trauma and are often associated with many complications. We designed a two-stage protocol for these complex injuries. The aim of this study was to assess the outcome of tibial segmental fractures treated according to this protocol. A prospective series of 25 consecutive segmental tibial fractures were treated using a two-stage procedure. In the first stage, a low-profile locking plate was applied as an external fixator to temporarily immobilize the fractures after anatomic reduction had been achieved followed by soft-tissue reconstruction. The second stage involved definitive internal fixation with a locking plate using a minimally invasive percutaneous plate osteosynthesis technique. The median follow-up was 32 months (range, 20-44 months). All fractures achieved union. The median time for the proximal fracture union was 23 weeks (range, 12-30 weeks) and that for distal fracture union was 27 weeks (range, 12-46 weeks; p = 0.08). Functional results were excellent in 21 patients and good in 4 patients. There were three cases of delayed union of distal fracture. Valgus malunion >5 degrees occurred in two patients, and length discrepancy >1 cm was observed in two patients. Pin tract infection occurred in three patients. Use of the two-stage procedure for treatment of segmental tibial fractures is recommended. Surgeons can achieve good reduction with stable temporary fixation, soft-tissue reconstruction, ease of subsequent definitive fixation, and high union rates. Our patients obtained excellent knee and ankle joint motion, good functional outcomes, and a comfortable clinical course.

  2. Safety considerations of PWR's

    International Nuclear Information System (INIS)

    Arnold, W.H. Jr.

    1977-01-01

    The safety of the central station pressurized water reactor is well established and substantiated by its excellent operating record. Operating data from 55 reactors of this type have established a record of safe operating history unparalleled by any modern large scale industry. The 186 plants under construction require a continuing commitment to maintain this outstanding record. The safety of the PWR has been further verified by the recently completed Reactor Safety Study (''Rasmussen'' Report). Not only has this study confirmed the exceptionally low risk associated with PWR operation, it has also introduced a valuable new tool in the decision making process. PWR designs, utilizing the philosophy of defense in depth, provide the bases for evaluating margins of safety. The design of the reactor coolant system, the containment system, emergency core cooling system and other related systems and components provide substantial margins of safety under both normal and postulated accident conditions even considering simultaneous effects of earthquakes and other environmental phenomena. Margins of safety in the assessment of various postulated accident conditions, with emphasis on the postulated loss of reactor coolant accident (LOCA), have been evaluated in depth as exemplified by the comprehensive ECCS rulemaking hearings followed by imposition of very conservative Nuclear Regulatory Commission requirements. When evaluated on an engineering best estimate approach, the significant margins to safety for a LOCA become more apparent. Extensive test programs have also substantiated margins to safety limits. These programs have included both separate effects and systems tests. Component testing has also been performed to substantiate performance levels under adverse combinations of environmental stress. The importance of utilizing past experience and of optimizing the deployment of incremental resources is self evident. Recent safety concerns have included specific areas such

  3. PWR secondary water chemistry guidelines

    International Nuclear Information System (INIS)

    Bell, M.J.; Blomgren, J.C.; Fackelmann, J.M.

    1982-10-01

    Steam generators in pressurized water reactor (PWR) nuclear power plants have experienced tubing degradation by a variety of corrosion-related mechanisms which depend directly on secondary water chemistry. As a result of this experience, the Steam Generator Owners Group and EPRI have sponsored a major program to provide solutions to PWR steam generator problems. This report, PWR Secondary Water Chemistry Guidelines, in addition to presenting justification for water chemistry control parameters, discusses available analytical methods, data management and surveillance, and the management philosophy required to successfully implement the guidelines

  4. PWR burnable absorber evaluation

    International Nuclear Information System (INIS)

    Cacciapouti, R.J.; Weader, R.J.; Malone, J.P.

    1995-01-01

    The purpose of the study was to evaluate the relative neurotic efficiency and fuel cycle cost benefits of PWR burnable absorbers. Establishment of reference low-leakage equilibrium in-core fuel management plans for 12-, 18- and 24-month cycles. Review of the fuel management impact of the integral fuel burnable absorber (IFBA), erbium and gadolinium. Calculation of the U 3 O 8 , UF 6 , SWU, fuel fabrication, and burnable absorber requirements for the defined fuel management plans. Estimation of fuel cycle costs of each fuel management plan at spot market and long-term market fuel prices. Estimation of the comparative savings of the different burnable absorbers in dollar equivalent per kgU of fabricated fuel. (author)

  5. PWR systems transient analysis

    International Nuclear Information System (INIS)

    Kennedy, M.F.; Peeler, G.B.; Abramson, P.B.

    1985-01-01

    Analysis of transients in pressurized water reactor (PWR) systems involves the assessment of the response of the total plant, including primary and secondary coolant systems, steam piping and turbine (possibly including the complete feedwater train), and various control and safety systems. Transient analysis is performed as part of the plant safety analysis to insure the adequacy of the reactor design and operating procedures and to verify the applicable plant emergency guidelines. Event sequences which must be examined are developed by considering possible failures or maloperations of plant components. These vary in severity (and calculational difficulty) from a series of normal operational transients, such as minor load changes, reactor trips, valve and pump malfunctions, up to the double-ended guillotine rupture of a primary reactor coolant system pipe known as a Large Break Loss of Coolant Accident (LBLOCA). The focus of this paper is the analysis of all those transients and accidents except loss of coolant accidents

  6. PWR degraded core analysis

    International Nuclear Information System (INIS)

    Gittus, J.H.

    1982-04-01

    A review is presented of the various phenomena involved in degraded core accidents and the ensuing transport of fission products from the fuel to the primary circuit and the containment. The dominant accident sequences found in the PWR risk studies published to date are briefly described. Then chapters deal with the following topics: the condition and behaviour of water reactor fuel during normal operation and at the commencement of degraded core accidents; the generation of hydrogen from the Zircaloy-steam and the steel-steam reactions; the way in which the core deforms and finally melts following loss of coolant; debris relocation analysis; containment integrity; fission product behaviour during a degraded core accident. (U.K.)

  7. Steam generators in PWR's

    International Nuclear Information System (INIS)

    Michel, R.

    1974-01-01

    The steam generator of the PWR operates according to the principle of natural circulation. It consists of a U-shaped tube bundle whose free ends are welded to a bottom plate. The tube bundle is surrounded by a cylinder jacket which has slots closely above the bottom or tube plate. The feed water mixed with boiling water enters the tube bundle through these slots. Because of its buoyancy, the steam-water mixture flows upwards. Below the tube plate there are chambers for distributing and collecting pressurized water separated by means of a partition wall. By omitting some tubes, a free alloy is created so that the tubes in the center get sufficient water, too. By asymmetrical arrangement of the partition wall it is further possible to limit the tube alloy only to the inlet side for pressurized water. The flow over the tube plate is thus improved on the inlet side. (DG) [de

  8. Holmium laser vs. conventional (cold knife) direct visual internal urethrotomy for short-segment bulbar urethral stricture: Outcome analysis.

    Science.gov (United States)

    Jhanwar, Ankur; Kumar, Manoj; Sankhwar, Satya Narayan; Prakash, Gaurav

    2016-01-01

    Our goal was to analyze the outcome between holmium laser and cold knife direct visual internal urethrotomy (DVIU) for short-segment bulbar urethral stricture. We conducted a prospective study comprised of 112 male patients seen from June 2013 to December 2014. Inclusion criterion was short-segment bulbar urethral stricture (≤1.5cm). Exclusion criteria were prior intervention/urethroplasty, pan-anterior urethral strictures, posterior stenosis, urinary tract infection, and those who lost to followup. Patients were divided into two groups; Group A (n=58) included cold knife DVIU and group B (n=54) included holmium laser endourethrotomy patients. Patient followup included uroflowmetry at postoperative Day 3, as well as at three months and six months. Baseline demographics were comparable in both groups. A total of 107 patients met the inclusion criteria and five patients were excluded due to inadequate followup. Mean stricture length was 1.31 ± 0.252 cm (p=0.53) and 1.34 ± 0.251 cm in Groups A and B, respectively. Mean operating time in Group A was 16.3 ± 1.78 min and in Group B was 20.96 ± 2.23 min (p=0.0001). Five patients in Group A had bleeding after the procedure that was managed conservatively by applying perineal compression. Three patients in Group B had fluid extravasation postoperatively. Qmax (ml/s) was found to be statistically insignificant between the two groups at all followups. Both holmium laser and cold knife urethrotomy are safe and equally effective in treating short-segment bulbar urethral strictures in terms of outcome and complication rate. However, holmium laser requires more expertise and is a costly alternative.

  9. Recent development in PWR zinc injection

    International Nuclear Information System (INIS)

    Ocken, H.; Fruzzetti, K.; Frattini, P.; Wood, C.J.

    2002-01-01

    Zinc injection to the reactor coolant system (RCS) of PWRs holds the promise to alleviate two key challenges facing PWR plant operators: (1) reducing degradation of coolant system materials, including nickel-base alloy tubing and lower alloy penetrations due to stress corrosion cracking, and (2) lowering shutdown dose rates. Primary water stress corrosion cracking (PWSCC) is a dominant tube failure mode at many plants. This paper summarizes recent observations from U. S. and international PWRs that have implemented zinc injection, focusing primarily on coolant chemistry and dose rate issues. It also provides a look at the future direction of EPRI-sponsored projects on this topic. (authors)

  10. Internal preference mapping of cured ham with consumer's segmentation in Spain

    OpenAIRE

    Resano, H.; Sanjuan, Ana Isabel

    2008-01-01

    The overall acceptability of 202 consumers has been analysed by ANOVA, multiple means comparison, cluster analysis and internal preference mapping (MDPREF). Three clusters are found with different preference criteria. These clusters can also be characterized according to actual purchase behaviour, declared consumption habits and sociodemographic characteristics. This study demonstrates the importance for the agro-food industry of examining consumers’ individual preferences as well as average ...

  11. The latest full-scale PWR simulator in Japan

    International Nuclear Information System (INIS)

    Nishimuru, Y.; Tagi, H.; Nakabayashi, T.

    2004-01-01

    The latest MHI Full-scale Simulator has an excellent system configuration, in both flexibility and extendability, and has highly sophisticated performance in PWR simulation by the adoption of CANAC-II and PRETTY codes. It also has an instructive character to display the plant's internal status, such as RCS condition, through animation. Further, the simulation has been verified to meet a functional examination at model plant, and with a scale model test result in a two-phase flow event, after evaluation for its accuracy. Thus, the Simulator can be devoted to a sophisticated and broad training course on PWR operation. (author)

  12. A Multi-Physics PWR Model for the Load Following

    OpenAIRE

    Muniglia , Mathieu; Do , Jean-Michel; Jean-Charles , Le Pallec; Grard , Hubert; Verel , Sébastien; David , S.

    2016-01-01

    International audience; In this paper, a new model of a Pressurized Water Reactor (PWR) is described. This model includes the description of the core as well as a simplified secondary loop: the goal is to reproduce a load-following type transient, where the output power of the plant is controlled by the electric grid. Consequently, the control systems are also modeled, as the control rods or the soluble boron. The reference power plant is a 1300MW electrical PWR, managed with the french G mode.

  13. Relationship marketing and disadvantaged health care segments: using internal marketing to improve the vocational rehabilitation process.

    Science.gov (United States)

    Peltier, James W; Scovotti, Carol

    2004-01-01

    The purpose of vocational rehabilitation (VR) is to provide disabled individuals with the training and support services needed to assimilate into the workforce. This study incorporates concepts developed in the relationship marketing and internal marketing literature to determine the factors that influence overall satisfaction of vocational training services. Results underscore the importance of social and structural bonds that develop among the multiple stakeholders involved in the VR process. Satisfaction is also influenced by the design and equipment used in the facilities and the efficiency of initiating VR services. A highly reliable instrument to measure VR participant satisfaction is presented.

  14. French PWR Safety Philosophy

    International Nuclear Information System (INIS)

    Conte, M. M.

    1986-01-01

    The first 900 MWe units, built under the American Westinghouse licence and with reference to the U. S. regulation, were followed by 28 standardized units, C P1 and C P2 series. Increasing knowledge and lessons learned from starting and operating experience of French nuclear power plants, completed by the experience learned from the operation of foreign reactors, has contributed to the improvement of French PWR design and safety philosophy. As early as 1976, this experience was taken into account by French Safety organisms to discuss, with Electricite de France, the safety options for the planned 1300 MWe units, P4 and P4 series. In 1983, the new reactor scheduled, Ni4 series 1400 MWe, is a totally French design which satisfies the French regulations and other French standards and codes. Based on a deterministic approach, the French safety analysis was progressively completed by a probabilistic approach each of them having possibilities and limits. Increasing knowledge and lessons learned from operating experience have contributed to the French safety philosophy improvement. The methodology now applied to safety evaluation develops a new facet of the in depth defense concept by taking highly unlikely events into consideration, by developing the search of safety consistency of the design, and by completing the deterministic approach by the probabilistic one

  15. Sizewell 'B' PWR reference design

    International Nuclear Information System (INIS)

    1982-04-01

    The reference design for a PWR power station to be constructed as Sizewell 'B' is presented in 3 volumes containing 14 chapters and in a volume of drawings. The report describes the proposed design and provides the basis upon which the safety case and the Pre-Construction Safety Report have been prepared. The station is based on a 3425MWt Westinghouse PWR providing steam to two turbine generators each of 600 MW. The layout and many of the systems are based on the SNUPPS design for Callaway which has been chosen as the US reference plant for the project. (U.K.)

  16. Acute inflammation induces segmental, bilateral, supraspinally mediated opioid release in the rat spinal cord, as measured by μ-opioid receptor internalization

    Science.gov (United States)

    Chen, Wenling; Marvizón, Juan Carlos G.

    2009-01-01

    The objective of this study was to measure opioid release in the spinal cord during acute and long-term inflammation using μ-opioid receptor (MOR) internalization. In particular, we determined whether opioid release occurs in the segments receiving the noxious signals or in the entire spinal cord, and whether it involves supraspinal signals. Internalization of neurokinin 1 receptors (NK1Rs) was measured to track the intensity of the noxious stimulus. Rats received peptidase inhibitors intrathecally to protect opioids from degradation. Acute inflammation of the hindpaw with formalin induced moderate MOR internalization in the L5 segment bilaterally, whereas NK1R internalization occurred only ipsilaterally. MOR internalization was restricted to the lumbar spinal cord, regardless of whether the peptidase inhibitors were injected in a lumbar or thoracic site. Formalin-induced MOR internalization was substantially reduced by isoflurane anesthesia. It was also markedly reduced by a lidocaine block of the cervical-thoracic spinal cord (which did not affect the evoked NK1R internalization) indicating that spinal opioid release is mediated supraspinally. In the absence of peptidase inhibitors, formalin and hindpaw clamp induced a small amount of MOR internalization, which was significantly higher than in controls. To study spinal opioid release during chronic inflammation, we injected Complete Freund's Adjuvant (CFA) in the hindpaw and peptidase inhibitors intrathecally. Two days later, no MOR or NK1R internalization was detected. Furthermore, CFA inflammation decreased MOR internalization induced by clamping the inflamed hindpaw. These results show that acute inflammation, but not chronic inflammation, induce segmental opioid release in the spinal cord that involves supraspinal signals. PMID:19298846

  17. Acute inflammation induces segmental, bilateral, supraspinally mediated opioid release in the rat spinal cord, as measured by mu-opioid receptor internalization.

    Science.gov (United States)

    Chen, W; Marvizón, J C G

    2009-06-16

    The objective of this study was to measure opioid release in the spinal cord during acute and long-term inflammation using mu-opioid receptor (MOR) internalization. In particular, we determined whether opioid release occurs in the segments receiving the noxious signals or in the entire spinal cord, and whether it involves supraspinal signals. Internalization of neurokinin 1 receptors (NK1Rs) was measured to track the intensity of the noxious stimulus. Rats received peptidase inhibitors intrathecally to protect opioids from degradation. Acute inflammation of the hind paw with formalin induced moderate MOR internalization in the L5 segment bilaterally, whereas NK1R internalization occurred only ipsilaterally. MOR internalization was restricted to the lumbar spinal cord, regardless of whether the peptidase inhibitors were injected in a lumbar or thoracic site. Formalin-induced MOR internalization was substantially reduced by isoflurane anesthesia. It was also markedly reduced by a lidocaine block of the cervical-thoracic spinal cord (which did not affect the evoked NK1R internalization) indicating that spinal opioid release is mediated supraspinally. In the absence of peptidase inhibitors, formalin and hind paw clamp induced a small amount of MOR internalization, which was significantly higher than in controls. To study spinal opioid release during chronic inflammation, we injected complete Freund's adjuvant (CFA) in the hind paw and peptidase inhibitors intrathecally. Two days later, no MOR or NK1R internalization was detected. Furthermore, CFA inflammation decreased MOR internalization induced by clamping the inflamed hind paw. These results show that acute inflammation, but not chronic inflammation, induces segmental opioid release in the spinal cord that involves supraspinal signals.

  18. Workers doses in central European PWR NPPs

    International Nuclear Information System (INIS)

    Janzekovic, H.; Krizman, M.

    2003-01-01

    As is stated, the ISOE database which was established in 1992 forms an excellent basis for studies and comparisons of occupational exposure data between nuclear power plants. In the year 2001, 69% of all participating reactors were pressurised water reactors. The ISOE database presents workers' exposure from 213 participating pressurised reactors (PWR) from 27 countries in that year. Among these 32 PWRs belong to six Central European Countries. The analysis of the exposure of workers based on radiation protection performance indicators (collective dose, average dose etc.) in these PWRs could be related to some nuclear safety performance indicators for recent years using ISOE database. The comparison is made to ISOE world - wide data. In the six Central European Countries altogether 32 PWR operated in the year 2001.The international databases of performance indicators related to radiation protection as for example the ISOE or the UNSCEAR database can be use as an efficient tool in the management of radiation protection of workers in a nuclear facilities and regulatory bodies. The databases enable the study of performance trends and the improvement of radiation protection. (authors)

  19. PWR AXIAL BURNUP PROFILE ANALYSIS

    International Nuclear Information System (INIS)

    J.M. Acaglione

    2003-01-01

    The purpose of this activity is to develop a representative ''limiting'' axial burnup profile for pressurized water reactors (PWRs), which would encompass the isotopic axial variations caused by different assembly irradiation histories, and produce conservative isotopics with respect to criticality. The effect that the low burnup regions near the ends of spent fuel have on system reactivity is termed the ''end-effect''. This calculation will quantify the end-effects associated with Pressurized Water Reactor (PWR) fuel assemblies emplaced in a hypothetical 21 PWR waste package. The scope of this calculation covers an initial enrichment range of 3.0 through 5.0 wt% U-235 and a burnup range of 10 through 50 GWd/MTU. This activity supports the validation of the process for ensuring conservative generation of spent fuel isotopics with respect to criticality safety applications, and the use of burnup credit for commercial spent nuclear fuel. The intended use of these results will be in the development of PWR waste package loading curves, and applications involving burnup credit. Limitations of this evaluation are that the limiting profiles are only confirmed for use with the B andW 15 x 15 fuel assembly design. However, this assembly design is considered bounding of all other typical commercial PWR fuel assembly designs. This calculation is subject to the Quality Assurance Requirements and Description (QARD) because this activity supports investigations of items or barriers on the Q-list (YMP 2001)

  20. Location of the internal carotid artery and ophthalmic artery segments for non-invasive intracranial pressure measurement by multi-depth TCD.

    Science.gov (United States)

    Hamarat, Yasin; Deimantavicius, Mantas; Kalvaitis, Evaldas; Siaudvytyte, Lina; Januleviciene, Ingrida; Zakelis, Rolandas; Bartusis, Laimonas

    2017-12-01

    The aim of the present study was to locate the ophthalmic artery by using the edge of the internal carotid artery (ICA) as the reference depth to perform a reliable non-invasive intracranial pressure measurement via a multi-depth transcranial Doppler device and to then determine the positions and angles of an ultrasonic transducer (UT) on the closed eyelid in the case of located segments. High tension glaucoma (HTG) patients and healthy volunteers (HVs) undergoing non-invasive intracranial pressure measurement were selected for this prospective study. The depth of the edge of the ICA was identified, followed by a selection of the depths of the IOA and EOA segments. The positions and angles of the UT on the closed eyelid were measured. The mean depth of the identified ICA edge for HTG patients was 64.3 mm and was 63.0 mm for HVs (p = 0.21). The mean depth of the selected IOA segment for HTG patients was 59.2 mm and 59.3 mm for HVs (p = 0.91). The mean depth of the selected EOA segment for HTG patients was 48.5 mm and 49.8 mm for HVs (p = 0.14). The difference in the located depths of the segments between groups was not statistically significant. The results showed a significant difference in the measured UT angles in the case of the identified edge of the ICA and selected ophthalmic artery segments (p = 0.0002). We demonstrated that locating the IOA and EOA segments can be achieved using the edge of the ICA as a reference point. OA: ophthalmic artery; IOA: intracranial segments of the ophthalmic artery; EOA: extracranial segments of the ophthalmic artery; ICA: internal carotid artery; UT: ultrasonic transducer; HTG: high tension glaucoma; SD: standard deviation; ICP: intracranial pressure; TCD: transcranial Doppler.

  1. Measurement of the residual stresses in a PWR Control Rod Drive Mechanism nozzle

    OpenAIRE

    Coules, Harry; Smith, David

    2018-01-01

    Residual stress in the welds that attach Control Rod Drive Mechanism nozzles into the upper head of a PWR reactor vessel can influence the vessel's structural integrity and initiate Primary Water Stress Corrosion Cracking. PWSCC at Alloy 600 CRDM nozzles has caused primary coolant leakage in operating PWRs. We have used Deep Hole Drilling to characterise residual stresses in a PWR vessel head. Measurements of the internal cladding and nozzle attachment weld showed that although modest tensile...

  2. PACTEL and PWR PACTEL Test Facilities for Versatile LWR Applications

    Directory of Open Access Journals (Sweden)

    Virpi Kouhia

    2012-01-01

    Full Text Available This paper describes construction and experimental research activities with two test facilities, PACTEL and PWR PACTEL. The PACTEL facility, comprising of reactor pressure vessel parts, three loops with horizontal steam generators, a pressurizer, and emergency core cooling systems, was designed to model the thermal-hydraulic behaviour of VVER-440-type reactors. The facility has been utilized in miscellaneous applications and experiments, for example, in the OECD International Standard Problem ISP-33. PACTEL has been upgraded and modified on a case-by-case basis. The latest facility configuration, the PWR PACTEL facility, was constructed for research activities associated with the EPR-type reactor. A significant design basis is to utilize certain parts of PACTEL, and at the same time, to focus on a proper construction of two new loops and vertical steam generators with an extensive instrumentation. The PWR PACTEL benchmark exercise was launched in 2010 with a small break loss-of-coolant accident test as the chosen transient. Both facilities, PACTEL and PWR PACTEL, are maintained fully operational side by side.

  3. PACTEL and PWR PACTEL Test Facilities for Versatile LWR Applications

    International Nuclear Information System (INIS)

    Virpi Kouhia, V.; Purhonen, H.; Riikonen, V.; Puustinen, M.; Kyrki-Rajamaki, R.; Vihavainen, J.

    2012-01-01

    This paper describes construction and experimental research activities with two test facilities, PACTEL and PWR PACTEL. The PACTEL facility, comprising of reactor pressure vessel parts, three loops with horizontal steam generators, a pressurizer, and emergency core cooling systems, was designed to model the thermal-hydraulic behaviour of VVER-440-type reactors. The facility has been utilized in miscellaneous applications and experiments, for example, in the OECD International Standard Problem ISP-33. PACTEL has been upgraded and modified on a case-by-case basis. The latest facility configuration, the PWR PACTEL facility, was constructed for research activities associated with the EPR-type reactor. A significant design basis is to utilize certain parts of PACTEL, and at the same time, to focus on a proper construction of two new loops and vertical steam generators with an extensive instrumentation. The PWR PACTEL benchmark exercise was launched in 2010 with a small break loss-of-coolant accident test as the chosen transient. Both facilities, PACTEL and PWR PACTEL, are maintained fully operational side by side.

  4. Effects of high-frequency stimulation of the internal pallidal segment on neuronal activity in the thalamus in parkinsonian monkeys

    Science.gov (United States)

    Kammermeier, Stefan; Pittard, Damien; Hamada, Ikuma

    2016-01-01

    Deep brain stimulation of the internal globus pallidus (GPi) is a major treatment for advanced Parkinson's disease. The effects of this intervention on electrical activity patterns in targets of GPi output, specifically in the thalamus, are poorly understood. The experiments described here examined these effects using electrophysiological recordings in two Rhesus monkeys rendered moderately parkinsonian through treatment with 1-methyl-4-phenyl-1,2,3,6-tetrahydropyridine (MPTP), after sampling control data in the same animals. Analysis of spontaneous spiking activity of neurons in the basal ganglia-receiving areas of the ventral thalamus showed that MPTP-induced parkinsonism is associated with a reduction of firing rates of segments of the data that contained neither bursts nor decelerations, and with increased burst firing. Spectral analyses revealed an increase of power in the 3- to 13-Hz band and a reduction in the γ-range in the spiking activity of these neurons. Electrical stimulation of the ventrolateral motor territory of GPi with macroelectrodes, mimicking deep brain stimulation in parkinsonian patients (bipolar electrodes, 0.5 mm intercontact distance, biphasic stimuli, 120 Hz, 100 μs/phase, 200 μA), had antiparkinsonian effects. The stimulation markedly reduced oscillations in thalamic firing in the 13- to 30-Hz range and uncoupled the spiking activity of recorded neurons from simultaneously recorded local field potential (LFP) activity. These results confirm that oscillatory and nonoscillatory characteristics of spontaneous activity in the basal ganglia receiving ventral thalamus are altered in MPTP-induced parkinsonism. Electrical stimulation of GPi did not entrain thalamic activity but changed oscillatory activity in the ventral thalamus and altered the relationship between spikes and simultaneously recorded LFPs. PMID:27683881

  5. Relationship between screw sagittal angle and stress on endplate of adjacent segments after anterior cervical corpectomy and fusion with internal fixation: a Chinese finite element study.

    Science.gov (United States)

    Zhang, Yu; Tang, Yibo; Shen, Hongxing

    2017-12-01

    In order to reduce the incidence of adjacent segment disease (ASD), the current study was designed to establish Chinese finite element models of normal 3rd~7th cervical vertebrae (C3-C7) and anterior cervical corpectomy and fusion (ACCF) with internal fixation , and analyze the influence of screw sagittal angle (SSA) on stress on endplate of adjacent cervical segments. Mimics 8.1 and Abaqus/CAE 6.10 softwares were adopted to establish finite element models. For C4 superior endplate and C6 inferior endplate, their anterior areas had the maximum stress in anteflexion position, and their posterior areas had the maximum stress in posterior extension position. As SSA increased, the stress reduced. With an increase of 10° in SSA, the stress on anterior areas of C4 superior endplate and C6 inferior endplate reduced by 12.67% and 7.99% in anteflexion position, respectively. With an increase of 10° in SSA, the stress on posterior areas of C4 superior endplate and C6 inferior endplate reduced by 9.68% and 10.22% in posterior extension position, respectively. The current study established Chinese finite element models of normal C3-C7 and ACCF with internal fixation , and demonstrated that as SSA increased, the stress on endplate of adjacent cervical segments decreased. In clinical surgery, increased SSA is able to play important role in protecting the adjacent cervical segments and reducing the incidence of ASD.

  6. PWR-to-PWR fuel cycle model using dry process

    International Nuclear Information System (INIS)

    Iqbal, M.; Jeong, Chang Joon; Rho, Gyu Hong

    2002-03-01

    PWR-to-PWR fuel cycle model has been developed to recycle the spent fuel using the dry fabrication process. Two types of fuels were considered; first fuel was based on low initial enrichment with low discharge burnup and second one was based on more initial enrichment with high discharge burnup in PWR. For recycling calculations, the HELIOS code was used, in which all of the available fission products were considered. The decay of 10 years was applied for reuse of the spent fuel. Sensitivity analysis for the fresh feed material enrichment has also been carried out. If enrichment of the mixing material is increased the saving of uranium reserves would be decreased. The uranium saving of low burned fuel increased from 4.2% to 7.4% in fifth recycling step for 5 wt% to 19.00wt% mixing material enrichment. While for high burned fuel, there was no uranium saving, which implies that higher uranium enrichment required than 5 wt%. For mixing of 15 wt% enriched fuel, the required mixing is about 21.0% and 37.0% of total fuel volume for low and high burned fuel, respectively. With multiple recycling, reductions in waste for low and high burned fuel became 80% and 60%, for first recycling, respectively. In this way, waste can be reduced more and the cost of the waste disposal reduction can provide the economic balance

  7. PWR plant construction in Japan

    International Nuclear Information System (INIS)

    Tamura, Toshifumi

    2002-01-01

    The construction methods based on the experiences on the Nuclear Island, which is a critical path in the total construction schedule, have been studied and reconsidered in order to construct by more reliable and economical method. So various improved construction method are being applied and the duration of construction is being reduced continuously. So various improved construction method are being applied and the duration of construction is being reduced continuously. In this paper, the history of construction of twenty-three (23) PWR Plant, the actual construction methods and schedule of Ohi-3/4, to which the many improved methods were applied during their construction, are introduced mainly with the improved points for previously constructed plants. And also the situation of construction method for the next PWR Plant is simply explained

  8. Uranium savings on a once through PWR fuel cycle

    International Nuclear Information System (INIS)

    Cupo, J.V.

    1980-01-01

    A number of alternatives which have the greatest potential for near term savings with minimum plant and fuel modifications have been examined at Westinghouse as part of continued internal assessment and part of NASAP study conducted for DOE pertaining to uranium utilization in a once through PWR fuel cycle. The alternatives which could be retrofitted to existing reactors were examined in more detail in the evaluation since they would have the greater near term impact on U savings

  9. PWR system reliability improvement activities

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1985-01-01

    In Japan lacking in energy resources, it is our basic energy policy to accelerate the development program of nuclear power, thereby reducing our dependence. As referred to in the foregoing, every effort has been exerted on our part to improve the PWR system reliability by dint of the so-called 'HOMEMADE' TQC activities, which is our brain-child as a result of applying to the energy industry the quality control philosophy developed in the field of manufacturing industry

  10. Road-map design for thorium-uranium breeding recycle in PWR - 031

    International Nuclear Information System (INIS)

    Shengyi, Si

    2010-01-01

    The paper was focused on designing a road-map to finally approach sustainable Thorium-Uranium ( 232 Th- 233 U) Breeding Recycle in current PWR, without any other change to the fuel lattice and the core internals, but substituting the UOX pellet with Thorium-based pellet. At first, the paper presented some insights to the inherence of Thorium-Uranium fuel conversion or breeding in PWR based on the neutronics theory and revealed the prerequisites for Thorium-Uranium fuel in PWR to achieve sustainable Breeding Recycle; And then, various Thorium-based fuels were designed and examined, and the calculation results further validated the above theoretical deductions; Based on the above theoretical analysis and calculation results, a road-map for sustainable Thorium-Uranium breeding recycle in PWR was outlined finally. (authors)

  11. PWR secondary water chemistry guidelines: Revision 3

    International Nuclear Information System (INIS)

    Lurie, S.; Bucci, G.; Johnson, L.; King, M.; Lamanna, L.; Morgan, E.; Bates, J.; Burns, R.; Eaker, R.; Ward, G.; Linnenbom, V.; Millet, P.; Paine, J.P.; Wood, C.J.; Gatten, T.; Meatheany, D.; Seager, J.; Thompson, R.; Brobst, G.; Connor, W.; Lewis, G.; Shirmer, R.; Gillen, J.; Kerns, M.; Jones, V.; Lappegaard, S.; Sawochka, S.; Smith, F.; Spires, D.; Pagan, S.; Gardner, J.; Polidoroff, T.; Lambert, S.; Dahl, B.; Hundley, F.; Miller, B.; Andersson, P.; Briden, D.; Fellers, B.; Harvey, S.; Polchow, J.; Rootham, M.; Fredrichs, T.; Flint, W.

    1993-05-01

    An effective, state-of-the art secondary water chemistry control program is essential to maximize the availability and operating life of major PWR components. Furthermore, the costs related to maintaining secondary water chemistry will likely be less than the repair or replacement of steam generators or large turbine rotors, with resulting outages taken into account. The revised PWR secondary water chemistry guidelines in this report represent the latest field and laboratory data on steam generator corrosion phenomena. This document supersedes Interim PWR Secondary Water Chemistry Recommendations for IGA/SCC Control (EPRI report TR-101230) as well as PWR Secondary Water Chemistry Guidelines--Revision 2 (NP-6239)

  12. Seismic proving test of PWR reactor containment vessel

    International Nuclear Information System (INIS)

    Akiyama, H.; Yoshikawa, T.; Tokumaru, Y.

    1987-01-01

    The seismic reliability proving tests of nuclear power plant facilities are carried out by Nuclear Power Engineering Test Center (NUPEC), using the large-scale, high-performance vibration of Tadotsu Engineering Laboratory, and sponsored by the Ministry of International Trade and Industry (MITI). In 1982, the seismic reliability proving test of PWR containment vessel started using the test component of reduced scale 1/3.7 and the test component proved to have structural soundness against earthquakes. Subsequently, the detailed analysis and evaluation of these test results were carried out, and the analysis methods for evaluating strength against earthquakes were established. Whereupon, the seismic analysis and evaluation on the actual containment vessel were performed by these analysis methods, and the safety and reliability of the PWR reactor containment vessel were confirmed

  13. Conceptual design of simplified PWR

    International Nuclear Information System (INIS)

    Tabata, Hiroaki

    1996-01-01

    The limited availability for location of nuclear power plant in Japan makes plants with higher power ratings more desirable. Having no intention of constructing medium-sized plants as a next generation standard plant, Japanese utilities are interested in applying passive technologies to large ones. So, Japanese utilities have studied large passive plants based on AP600 and SBWR as alternative future LWRs. In a joint effort to develop a new generation nuclear power plant which is more friendly to operator and maintenance personnel and is economically competitive with alternative sources of power generation, JAPC and Japanese Utilities started the study to modify AP600 and SBWR, in order to accommodate the Japanese requirements. During a six year program up to 1994, basic concepts for 1000 MWe class Simplified PWR (SPWR) and Simplified BWR (SBWR) were developed, though there still remain several areas to be improved. These studies have now stepped into the phase of reducing construction cost and searching for maximum power rating that can be attained by reasonably practical technology. These results also suggest that it is hopeful to develop a large 3-loop passive plant (∼1200 MWe). Since Korea mainly deals with PWR, this paper summarizes SPWR study. The SPWR is jointly studied by JAPC, Japanese PWR Utilities, EdF, WH and Mitsubishi Heavy Industry. Using the AP-600 reference design as a basis, we enlarged the plant size to 3-loops and added engineering features to conform with Japanese practice and Utilities' preference. The SPWR program definitively confirmed the feasibility of a passive plant with an NSSS rating about 1000 MWe and 3 loops. (J.P.N.)

  14. Structure-dynamic model verification calculation of PWR 5 tests

    International Nuclear Information System (INIS)

    Engel, R.

    1980-02-01

    Within reactor safety research project RS 16 B of the German Federal Ministry of Research and Technology (BMFT), blowdown experiments are conducted at Battelle Institut e.V. Frankfurt/Main using a model reactor pressure vessel with a height of 11,2 m and internals corresponding to those in a PWR. In the present report the dynamic loading on the pressure vessel internals (upper perforated plate and barrel suspension) during the DWR 5 experiment are calculated by means of a vertical and horizontal dynamic model using the CESHOCK code. The equations of motion are resolved by direct integration. (orig./RW) [de

  15. Extracranial-intracranial bypass in medial sphenoid ridge meningioma associated with severe stenosis of the intracranial segments of the internal carotid artery: A case report.

    Science.gov (United States)

    Huang, Yabo; Wang, Zhong; Han, Qingdong

    2018-06-01

    Tumor resection and extracranial-intracranial bypass concerning medial sphenoid ridge meningioma associated with severe stenosis of the internal carotid artery (ICA) of intracranial segments has been rarely presented. Effective treatment as to the complex lesions may be complicated. Tumor resection and cerebrovascular protection should be both taken into consideration. We presented one case of medial sphenoid ridge meningioma associated with severe stenosis of the internal carotid artery of intracranial segments. The patient suffered hyperthyroidism, mirror-image dextrocardia and congenital heart disease atrial septal defect simultaneously. Before the neurosurgical treatment , the colleagues of department of cardiac surgery, anesthesiology and respiratory medicine agreed on our plan of resecting the tumor following the comprehensive evaluation of basal clinical conditions in the patient. For reducing the bleeding intraoperatively, the interventional branch performed digital subtraction angiography(DSA) and found collateral anastomosis between the supplying vessels of left middle meningeal arteries and anterior choroid arteries. No preoperative interventional embolization was determined considering the risk of cerebral ischemia. The following subtotal resection of medial sphenoid ridge meningioma and left extracranial-intracranial bypass were carried out. Additionally, ipsilateral decompressive craniectomy was done. Post-operative imaging Computed tomography (CT), Computed tomography angiography (CTA) and Transcranial Doppler (TCD) indicated subtotal resection of tumor and bypass patency. The patient was discharged with the right limbs of muscle strength of grade IV. The muscle strength of the patient returned to grade V after 6 months of follow-up. Comprehensive treatment of tumor resection and extracranial-intracranial bypass concerning medial sphenoid ridge meningioma associated with severe stenosis of the internal carotid artery of intracranial segments is

  16. FLUOLE-2: An Experiment for PWR Pressure Vessel Surveillance

    Directory of Open Access Journals (Sweden)

    Thiollay Nicolas

    2016-01-01

    Full Text Available FLUOLE-2 is a benchmark-type experiment dedicated to 900 and 1450 MWe PWR vessels surveillance dosimetry. This two-year program started in 2014 and will end in 2015. It will provide precise experimental data for the validation of the neutron spectrum propagation calculation from core to vessel. It is composed of a square core surrounded by a stainless steel baffe and internals: PWR barrel is simulated by steel structures leading to different steel-water slides; two steel components stand for a surveillance capsule holder and for a part of the pressure vessel. Measurement locations are available on the whole experimental structure. The experimental knowledge of core sources will be obtained by integral gamma scanning measurements directly on fuel pins. Reaction rates measured by calibrated fission chambers and a large set of dosimeters will give information on the neutron energy and spatial distributions. Due to the low level neutron flux of EOLE ZPR a special, high efficiency, calibrated gamma spectrometry device will be used for some dosimeters, allowing to measure an activity as low as 7. 10−2 Bq per sample. 103mRh activities will be measured on an absolute calibrated X spectrometry device. FLUOLE-2 experiment goal is to usefully complete the current experimental benchmarks database used for the validation of neutron calculation codes. This two-year program completes the initial FLUOLE program held in 2006–2007 in a geometry representative of 1300 MWe PWR.

  17. PWR thermocouple mechanical sealing structure

    International Nuclear Information System (INIS)

    Shen Qiuping; He Youguang

    1991-08-01

    The PWR in-core temperature detection device, which is one of measures to insure reactor safety operation, is to monitor and diagnose reactor thermal power output and in-core power distribution. The temperature detection device system uses thermocouples as measuring elements with stainless steel protecting sleeves. The thermocouple has a limited service time and should be replaced after its service time has reached. A new sealing device for the thermocouples of reactor in-core temperature detection system has been developed to facilitate replacement. The structure is complete tight under high temperature and pressure without any leakage and seepage, and easy to be assembled or disassembled in radioactive environment. The device is designed to make it possible to replace the thermocouple one by one if necessary. This is a new, simple and practical structure

  18. PWR standardization: The French experience

    International Nuclear Information System (INIS)

    Bacher, P.E.

    1987-01-01

    After a short historical review of the French PWR programme with 45000 MWe in operation and 15000 MWe under construction, the paper first develops the objectives and limits of the standardizatoin policy. Implementation of standardization is described through successive reactor series and feedback of experience, together with its impact on safety and on codes and standards. Present benefits of standardization range from low engineering costs to low backfitting costs, via higher quality, reduction in construction times and start-up schedules and improved training of operators. The future of the French programme into the 1990's is again with an advanced standardized series, the N4-1400 MW plant. There is no doubt that the very positive experience with standardization is relevant to any country trying to achieve self-reliance in the nuclear power field. (author)

  19. Babcock and Wilcox advanced PWR development

    International Nuclear Information System (INIS)

    Kulynych, G.E.; Lemon, J.E.

    1986-01-01

    The Babcock and Wilcox 600 MWe PWR design is discussed. Main features of the new B-600 design are improvements in reactor system configuration, glandless coolant pumps, safety features, core design and steam generators

  20. Hydrogen production in a PWR during LOCA

    International Nuclear Information System (INIS)

    Cassette, P.

    1983-12-01

    The purpose of this paper is to provide information on hydrogen generation during LOCA in French 900 MW PWR power plants. The design basis accident is taken into account as well as more severe accidents assuming failure of emergency systems

  1. Evaluation of holmium laser versus cold knife in optical internal urethrotomy for the management of short segment urethral stricture.

    Science.gov (United States)

    Jain, Sudhir Kumar; Kaza, Ram Chandra Murthy; Singh, Bipin Kumar

    2014-10-01

    SACHSE COLD KNIFE IS CONVENTIONALLY USED FOR OPTICAL INTERNAL URETHROTOMY INTENDED TO MANAGE URETHRAL STRICTURES AND HO: YAG laser is an alternative to it. The aim of this study was to evaluate the role of urethral stricture treatment outcomes, efficacy, and complications using cold knife and Ho: YAG (Holmium laser) for optical internal urethrotomy. In this prospective study included, 90 male patients age >18 years, with diagnosis of urethral stricture admitted for internal optical urethrotomy during April 2010 to March 2012. The patients were randomized into two groups containing 45 patients each using computer generated random number. In group A (Holmium group), internal urethrotomy was done with Holmium laser and in group B (Cold knife group) Sachse cold knife was used. Patients were followed up for 6 months after surgery in Out Patient Department on 15, 30 and 180 post-operative days. At each follow up visit physical examination, and uroflowmetry was performed along with noting complaints, if any. The peak flow rates (PFR) were compared between the two groups on each follow up. At 180 days (6 month interval) the difference between mean of PFR for Holmium and Cold knife group was statistically highly significant (P knife urethrotomy.

  2. Rupther: a simulation approach applied to a PWR vessel failure during a severe accident

    International Nuclear Information System (INIS)

    Mongabure, Ph.; Nicolas, L.; Devos, J.

    2000-01-01

    The Rupther program (Rupture Under Thermal Conditions) is a part of the international researches on severe accidents in the PWR type reactors. The aim of the program is the definition of failure simulation validated by experimental data on vessel steel 16MND5 mechanical properties. The paper presents the program and the first results. (A.L.B.)

  3. Dissolution experiments of commercial PWR (52 MWd/kgU) and BWR (53 MWd/kgU) spent nuclear fuel cladded segments in bicarbonate water under oxidizing conditions. Experimental determination of matrix and instant release fraction

    Energy Technology Data Exchange (ETDEWEB)

    González-Robles, E., E-mail: ernesto.gonzalez-robles@kit.edu [CTM Centre Tecnològic, Plaça de la Ciència 2, 08243 Manresa (Spain); Serrano-Purroy, D. [European Commission - EC, Joint Research Centre (JRC), Institute for Transuranium Elements - ITU, Postfach 2340, D-76125 Karlsruhe (Germany); Sureda, R. [CTM Centre Tecnològic, Plaça de la Ciència 2, 08243 Manresa (Spain); Casas, I. [Chemical Engineering Department, Universitat Politècnica de Catalunya, Av. Diagonal 647, 08028 Barcelona (Spain); Pablo, J. de [CTM Centre Tecnològic, Plaça de la Ciència 2, 08243 Manresa (Spain); Chemical Engineering Department, Universitat Politècnica de Catalunya, Av. Diagonal 647, 08028 Barcelona (Spain)

    2015-10-15

    The denominated instant release fraction (IRF) is considered in performance assessment (PA) exercises to govern the dose that could arise from the repository. A conservative definition of IRF comprises the total inventory of radionuclides located in the gap, fractures, and the grain boundaries and, if present, in the high burn-up structure (HBS). The values calculated from this theoretical approach correspond to an upper limit that likely does not correspond to what it will be expected to be instantaneously released in the real system. Trying to ascertain this IRF from an experimental point of view, static leaching experiments have been carried out with two commercial UO{sub 2} spent nuclear fuels (SNF): one from a pressurized water reactor (PWR), labelled PWR, with an average burn-up (BU) of 52 MWd/kgU and fission gas release (FGR) of 23.1%, and one from a boiling water reactor (BWR), labelled BWR, with an average BU of and 53 MWd/kgU and FGR of 3.9%. One sample of each SNF, consisting of fuel and cladding, has been leached in bicarbonate water during one year under oxidizing conditions at room temperature (25 ± 5)°C. The behaviour of the concentration measured in solution can be divided in two according to the release rate. All radionuclides presented an initial release rate that after some days levels down to a slower second one, which remains constant until the end of the experiment. Cumulative fraction of inventory in aqueous phase (FIAP{sub c}) values has been calculated. Results show faster release in the case of the PWR SNF. In both cases Np, Pu, Am, Cm, Y, Tc, La and Nd dissolve congruently with U, while dissolution of Zr, Ru and Rh is slower. Rb, Sr, Cs and Mo, dissolve faster than U. The IRF of Cs at 10 and 200 days has been calculated, being (3.10 ± 0.62) and (3.66 ± 0.73) for PWR fuel, and (0.35 ± 0.07) and (0.51 ± 0.10) for BWR fuel.

  4. PWR vessel flaw distribution development

    International Nuclear Information System (INIS)

    Rosinski, S.T.; Kennedy, E.L.; Foulds, J.R.; Kinsman, K.M.

    1990-01-01

    This paper reports on PWR pressure vessels which operate under NRC rules and regulatory guides intended to prevent failure of the vessels. Plants failing to meet the operating criteria specified under these rules and regulations are required to analytically demonstrate fitness for service in order to continue operation. The initial flaw size or distribution of initial vessel flaws is a key input to the required vessel integrity analyses. However, the flaw distribution assumed in the development of the NRC Regulations and recommended for the plant specific analyses is potentially over-conservative. This is because the distribution is based on the limited amount of vessel inspection data available at the time the criteria were being developed and does not take full advantage of the more recent and reliable domestic vessel inspection results. The U.S. Department of Energy is funding an effort through Sandia National Laboratories to investigate the possibility of developing a new flaw distribution based on the increased amount and improved reliability of domestic vessel inspection data. Results of Phase I of the program indicate that state-of-the-art NDE systems' capabilities are sufficient for development of a new flaw distribution that could ultimately provide life extension benefits over the presently required operating practice

  5. Upgrading of PWR plant simulators

    International Nuclear Information System (INIS)

    Wada, Tomonori; Sasaki, Kazunori; Nakaishi, Hirokazu.

    1989-01-01

    For the education and training of operators in electric power plants, simulators have been employed, and it is well known that their effect is great. There are operation training simulators which simulate the dynamic characteristics of plants and all the machinery and equipment that operators handle, and train the procedure of restoration at the time of abnormality in plants, education simulators which can analyze the dynamic characteristics of plants efficiently in a short time, and offer information by visualizing phenomena with three-dimensional display and others so as to be easily understandable, and forecast simulators which do the analysis forecasting plant behavior at the time of abnormality in plants, and investigate the necessity of the guide for operation procedure and the countermeasures at the time of emergency. In this explanation, the upgrading of operation training simulators which have been put already in training is discussed. The constitution of simulator system and the instructor function, the outline of PWR plant simulation models comprising thermal flow model, pump model, leak model and so on, the techniques of increasing simulator speed, and the example of analysis using the NUPAC code are reported. (K.I.)

  6. PWR secondary water chemistry study

    International Nuclear Information System (INIS)

    Pearl, W.L.; Sawochka, S.G.

    1977-02-01

    Several types of corrosion damage are currently chronic problems in PWR recirculating steam generators. One probable cause of damage is a local high concentration of an aggressive chemical even though only trace levels are present in feedwater. A wide variety of trace chemicals can find their way into feedwater, depending on the sources of condenser cooling water and the specific feedwater treatment. In February 1975, Nuclear Water and Waste Technology Corporation (NWT), was contracted to characterize secondary system water chemistry at five operating PWRs. Plants were selected to allow effects of cooling water chemistry and operating history on steam generator corrosion to be evaluated. Calvert Cliffs 1, Prairie Island 1 and 2, Surry 2, and Turkey Point 4 were monitored during the program. Results to date in the following areas are summarized: (1) plant chemistry variations during normal operation, transients, and shutdowns; (2) effects of condenser leakage on steam generator chemistry; (3) corrosion product transport during all phases of operation; (4) analytical prediction of chemistry in local areas from bulk water chemistry measurements; and (5) correlation of corrosion damage to chemistry variation

  7. Active Segmentation.

    Science.gov (United States)

    Mishra, Ajay; Aloimonos, Yiannis

    2009-01-01

    The human visual system observes and understands a scene/image by making a series of fixations. Every fixation point lies inside a particular region of arbitrary shape and size in the scene which can either be an object or just a part of it. We define as a basic segmentation problem the task of segmenting that region containing the fixation point. Segmenting the region containing the fixation is equivalent to finding the enclosing contour- a connected set of boundary edge fragments in the edge map of the scene - around the fixation. This enclosing contour should be a depth boundary.We present here a novel algorithm that finds this bounding contour and achieves the segmentation of one object, given the fixation. The proposed segmentation framework combines monocular cues (color/intensity/texture) with stereo and/or motion, in a cue independent manner. The semantic robots of the immediate future will be able to use this algorithm to automatically find objects in any environment. The capability of automatically segmenting objects in their visual field can bring the visual processing to the next level. Our approach is different from current approaches. While existing work attempts to segment the whole scene at once into many areas, we segment only one image region, specifically the one containing the fixation point. Experiments with real imagery collected by our active robot and from the known databases 1 demonstrate the promise of the approach.

  8. Thermo-mechanical analysis of PWR bolts susceptible to IASCC

    International Nuclear Information System (INIS)

    Matteoli, C.; Hannink, M.H.C.; Blom, F.J.; Marck, S.C. van der; Charpin-Jacobs, F.

    2015-01-01

    Irradiation Assisted Stress Corrosion Cracking (IASCC) is considered a primary ageing issue for the Reactor Pressure Vessel (RPV) internals of Pressurized Water Reactors (PWR). In particular, this complex phenomenon which develops in an environment featuring thermal and mechanical stresses, interaction with corrosive compounds and irradiation, is affecting the bolts connecting the baffles and the formers in the Nuclear Power Plants' RPVs. The baffle-former assembly is the structure that borders the fuel assemblies region, contributing to keep them in position and separating in the radial direction, the core region from the downcomer region. An evaluation of the stresses and temperatures reached in the baffle-former bolts during normal operation was performed by means of a coupled thermo-mechanical study which uses reactor physics calculations to obtain the fluence in the reactor core and as a consequence the heat deposition in the RPV internals. The heat deposition data are coupled with a finite element model of the bolts and the RPV internals in order to perform a complete analysis taking in account thermal, mechanical and radiation loadings. The study is first carried out focusing on a section of the RPV internals, showing a single row of baffle-former bolts. Then the work is extended to the full core height. The model set up in this work, includes an in-depth study of the behavior of the core internals, in particular baffle-former bolts. The model has the capability of understanding the mechanical and thermal behavior of essential internal components in a PWR. (authors)

  9. Comprehensive exergetic and economic comparison of PWR and hybrid fossil fuel-PWR power plants

    International Nuclear Information System (INIS)

    Sayyaadi, Hoseyn; Sabzaligol, Tooraj

    2010-01-01

    A typical 1000 MW Pressurized Water Reactor (PWR) nuclear power plant and two similar hybrid 1000 MW PWR plants operate with natural gas and coal fired fossil fuel superheater-economizers (Hybrid PWR-Fossil fuel plants) are compared exergetically and economically. Comparison is performed based on energetic and economic features of three systems. In order to compare system at their optimum operating point, three workable base case systems including the conventional PWR, and gas and coal fired hybrid PWR-Fossil fuel power plants considered and optimized in exergetic and exergoeconomic optimization scenarios, separately. The thermodynamic modeling of three systems is performed based on energy and exergy analyses, while an economic model is developed according to the exergoeconomic analysis and Total Revenue Requirement (TRR) method. The objective functions based on exergetic and exergoeconomic analyses are developed. The exergetic and exergoeconomic optimizations are performed using the Genetic Algorithm (GA). Energetic and economic features of exergetic and exergoeconomic optimized conventional PWR and gas and coal fired Hybrid PWR-Fossil fuel power plants are compared and discussed comprehensively.

  10. Parallel GPU implementation of PWR reactor burnup

    International Nuclear Information System (INIS)

    Heimlich, A.; Silva, F.C.; Martinez, A.S.

    2016-01-01

    Highlights: • Three GPU algorithms used to evaluate the burn-up in a PWR reactor. • Exhibit speed improvement exceeding 200 times over the sequential. • The C++ container is expansible to accept new nuclides chains. - Abstract: This paper surveys three methods, implemented for multi-core CPU and graphic processor unit (GPU), to evaluate the fuel burn-up in a pressurized light water nuclear reactor (PWR) using the solutions of a large system of coupled ordinary differential equations. The reactor physics simulation of a PWR reactor spends a long execution time with burnup calculations, so performance improvement using GPU can imply in better core design and thus extended fuel life cycle. The results of this study exhibit speed improvement exceeding 200 times over the sequential solver, within 1% accuracy.

  11. ABB advanced BWR and PWR fuel

    International Nuclear Information System (INIS)

    Junkrans, S.; Helmersson, S.; Andersson, S.

    1999-01-01

    Fuel designed and fabricated by ABB is now operating in 40 PWRs and BWRs in Europe, the United States and Korea. An excellent fuel reliability track record has been established. High burnups are proven for both BWR and PWR. Thermal margin improving features and advanced burnable absorber concepts enable the utilities to adopt demanding duty cycles to meet new economic objectives. In particular we note the excellent reliability record of ABB PWR fuel equipped with Guardian TM debris filter, proven to meet the -6 rod-cycles fuel failure goal, and the out-standing operating record of the SVEA 10x10 BWR fuel, where ABB is the only vendor to date with multi batch experience to high burnup. ABB is dedicated to maintain high fuel reliability as well as continually improve and develop a broad line of BWR and PWR products. ABB's development and fuel follow-up activities are performed in close co-operation with its customers. (orig.)

  12. Segmentation: Identification of consumer segments

    DEFF Research Database (Denmark)

    Høg, Esben

    2005-01-01

    It is very common to categorise people, especially in the advertising business. Also traditional marketing theory has taken in consumer segments as a favorite topic. Segmentation is closely related to the broader concept of classification. From a historical point of view, classification has its...... origin in other sciences as for example biology, anthropology etc. From an economic point of view, it is called segmentation when specific scientific techniques are used to classify consumers to different characteristic groupings. What is the purpose of segmentation? For example, to be able to obtain...... a basic understanding of grouping people. Advertising agencies may use segmentation totarget advertisements, while food companies may usesegmentation to develop products to various groups of consumers. MAPP has for example investigated the positioning of fish in relation to other food products...

  13. Segmental Vitiligo.

    Science.gov (United States)

    van Geel, Nanja; Speeckaert, Reinhart

    2017-04-01

    Segmental vitiligo is characterized by its early onset, rapid stabilization, and unilateral distribution. Recent evidence suggests that segmental and nonsegmental vitiligo could represent variants of the same disease spectrum. Observational studies with respect to its distribution pattern point to a possible role of cutaneous mosaicism, whereas the original stated dermatomal distribution seems to be a misnomer. Although the exact pathogenic mechanism behind the melanocyte destruction is still unknown, increasing evidence has been published on the autoimmune/inflammatory theory of segmental vitiligo. Copyright © 2016 Elsevier Inc. All rights reserved.

  14. Preliminary study on direct recycling of spent PWR fuel in PWR system

    International Nuclear Information System (INIS)

    Waris, Abdul; Nuha; Novitriana; Kurniadi, Rizal; Su'ud, Zaki

    2012-01-01

    Preliminary study on direct recycling of PWR spent fuel to support SUPEL (Straight Utilization of sPEnt LWR fuel in LWR system) scenario has been conducted. Several spent PWR fuel compositions in loaded PWR fuel has been evaluated to obtain the criticality of reactor. The reactor can achieve it criticality for U-235 enrichment in the loaded fresh fuel is at least 4.0 a% with the minimum fraction of the spent fuel in the core is 15.0 %. The neutron spectra become harder with the escalating of U-235 enrichment in the loaded fresh fuel as well as the amount of the spent fuel in the core.

  15. A Comparison of Amplitude-Based and Phase-Based Positron Emission Tomography Gating Algorithms for Segmentation of Internal Target Volumes of Tumors Subject to Respiratory Motion

    International Nuclear Information System (INIS)

    Jani, Shyam S.; Robinson, Clifford G.; Dahlbom, Magnus; White, Benjamin M.; Thomas, David H.; Gaudio, Sergio; Low, Daniel A.; Lamb, James M.

    2013-01-01

    Purpose: To quantitatively compare the accuracy of tumor volume segmentation in amplitude-based and phase-based respiratory gating algorithms in respiratory-correlated positron emission tomography (PET). Methods and Materials: List-mode fluorodeoxyglucose-PET data was acquired for 10 patients with a total of 12 fluorodeoxyglucose-avid tumors and 9 lymph nodes. Additionally, a phantom experiment was performed in which 4 plastic butyrate spheres with inner diameters ranging from 1 to 4 cm were imaged as they underwent 1-dimensional motion based on 2 measured patient breathing trajectories. PET list-mode data were gated into 8 bins using 2 amplitude-based (equal amplitude bins [A1] and equal counts per bin [A2]) and 2 temporal phase-based gating algorithms. Gated images were segmented using a commercially available gradient-based technique and a fixed 40% threshold of maximum uptake. Internal target volumes (ITVs) were generated by taking the union of all 8 contours per gated image. Segmented phantom ITVs were compared with their respective ground-truth ITVs, defined as the volume subtended by the tumor model positions covering 99% of breathing amplitude. Superior-inferior distances between sphere centroids in the end-inhale and end-exhale phases were also calculated. Results: Tumor ITVs from amplitude-based methods were significantly larger than those from temporal-based techniques (P=.002). For lymph nodes, A2 resulted in ITVs that were significantly larger than either of the temporal-based techniques (P<.0323). A1 produced the largest and most accurate ITVs for spheres with diameters of ≥2 cm (P=.002). No significant difference was shown between algorithms in the 1-cm sphere data set. For phantom spheres, amplitude-based methods recovered an average of 9.5% more motion displacement than temporal-based methods under regular breathing conditions and an average of 45.7% more in the presence of baseline drift (P<.001). Conclusions: Target volumes in images generated

  16. Crack growth rate of PWR piping

    International Nuclear Information System (INIS)

    Bethmont, M.; Doyen, J.J.; Lebey, J.

    1979-01-01

    The Aquitaine 1 program, carried out jointly by FRAMATOME and the CEA is intended to improve knowledge about cracking mechanisms in AISI 316 L austenitic stainless steel under conditions similar to those of the PWR environment (irradiation excluded). Experiments of fatigue crack growth are performed on piping elements, scale 1/4 of primary pipings, by means of internal hydraulic cyclic pressure. Interpretation of results requires a knowledge of the stress intensity factor Ksub(I) at the front of the crack. Results of a series of calculations of Ksub(I) obtained by different methods for defects of finite and infinite length (three dimensional calculations) are given in the paper. The following have been used: calculations by finite elements, calculations by weight function. Notches are machined on the test pipes, which are subjected to internal hydraulic pressure cycles, under cold conditions, to initiate a crack at the tip of the notch. They are then cycled at a frequency of 4 cycles/hour on on water demineralised loop at a temperature of 280 0 C, the pressure varying at each cycle between approximately 160 bars and 3 bars. After each test, a specimen containing the defect is taken from the pipe for micrographic analysis. For the first test the length of the longitudinal external defect is assumed infinite. The number of cycles carried out is 5880 cycles. Two defects are machined in the tube for the second test. The number of cycles carried out is N = 440. The tests are performed under hot conditions (T = 280 0 C). For the third test two defects are analysed under cold and hot conditions. The number of cycles carried out for the external defect is 7000 when hot and 90000 when cold. The number of cycles for the internal defect is 1650 when hot and 68000 when cold. In order to interpret the results, the data da/dN are plotted on a diagram versus ΔK. Comparisons are made between these results and the curves from laboratory tests

  17. International Cooperation for the Dismantling of Chooz A Reactor Pressure Vessel

    International Nuclear Information System (INIS)

    Grenouillet, J.J.; Posivak, E.

    2009-01-01

    Chooz A is the first PWR that is being decommissioned in France. The main issue that is conditioning the success of the project is the Reactor Pressure Vessel (RPV) and Reactor Vessel Internals (RVI) segmentation. Whereas Chooz A is the first and unique RPV and RVI being dismantled in France, there are many similar experiences available in the world. Thus the project team was eager to cooperate with other teams facing or being faced with the same issue. A cooperation programme was established in two separate ways: - Benefiting from experience feedback from completed RPV and RVI dismantling projects, - Looking for synergy with future RPV dismantling projects for activities such as segmentation tools design, qualification and manufacturing for example. This paper describes the implementation of this programme and how the outcome of the cooperation was used for the implementation of Chooz-A RPV and RVI segmentation project. It shows also the limits of such a cooperation. (authors)

  18. An analysis of transients in the PWR downcomer

    International Nuclear Information System (INIS)

    Jovanovic, A.

    1981-01-01

    The paper deals with the problem of determining non-stationary temperature field in the downcomer of a PWR type reactor. For this purpose, an analytical model has been developed. The model covers five components of (PWR - Krsko) downcomer: the core-barrel, floor between the core-barrel and the thermal shield, the thermal shield, flow between the thermal shield and the reactor vessel wall, the reactor vessel wall. The model includes internal heat generation in metal structures. The governing equations of the model have been written in the finite difference explicit form. The system of resulting algebraic equations was solved bu Gauss-Seidel method, using a modular computer code. Several characteristic transients were examined (step and continuous change of fluid temperature at the inlet nozzle). Also, an analysis of main parameters (heat transfer coefficient and flow rate) has been performed. The model is intended to be used as basics for further development of a more realistic model that could be used for practical safety analysis. (author)

  19. PWR reactors for BBR nuclear power plants

    International Nuclear Information System (INIS)

    Structure and functioning of the nuclear steam generator system developed by BBR and its components are described. Auxiliary systems, control and load following behaviour and fuel management are discussed and the main data of PWR given. The brochure closes with a perspective of the future of the Muelheim-Kaerlich nuclear power plant. (GL) [de

  20. Thermohydraulic calculations of PWR primary circuits

    International Nuclear Information System (INIS)

    Botelho, D.A.

    1984-01-01

    Some mathematical and numerical models from Retran computer codes aiming to simulate reactor transients, are presented. The equations used for calculating one-dimensional flow are integrated using mathematical methods from Flash code, with steam code to correlate the variables from thermodynamic state. The algorithm obtained was used for calculating a PWR reactor. (E.G.) [pt

  1. Coolant monitoring systems for PWR reactors

    International Nuclear Information System (INIS)

    Luzhnov, A.M.; Morozov, V.V.; Tsypin, S.G.

    1987-01-01

    The ways of improving information capacity of existing monitoring systems and the necessity of designing new ones for coolant monitoring are reviewed. A wide research program on development of coolant monitoring systems in PWR reactors is analyzed. The possible applications of in-core and out-of-core detectors for coolant monitoring are demonstrated

  2. Secondary systems of PWR and BWR

    International Nuclear Information System (INIS)

    Schindler, N.

    1981-01-01

    The secondary systems of a nuclear power plant comprises the steam, condensate and feedwater cycle, the steam plant auxiliary or ancillary systems and the cooling water systems. The presentation gives a general review about the main systems which show a high similarity of PWR and BWR plants. (orig./RW)

  3. Simulation model of a PWR power plant

    International Nuclear Information System (INIS)

    Larsen, N.

    1987-03-01

    A simulation model of a hypothetical PWR power plant is described. A large number of disturbances and failures in plant function can be simulated. The model is written as seven modules to the modular simulation system for continuous processes DYSIM and serves also as a user example of this system. The model runs in Fortran 77 on the IBM-PC-AT. (author)

  4. Utilization of thorium in PWR type reactors

    International Nuclear Information System (INIS)

    Correa, F.

    1977-01-01

    Uranium 235 consumption is comparatively evaluated with thorium cycle for a PWR type reactor. Modifications are only made in fuels components. U-235 consumption is pratically unchanged in both cycles. Some good results are promised to the mixed U-238/Th-232 fuel cycle in 1/1 proportion [pt

  5. Improvement of PWR reliability by corrosion prevention

    International Nuclear Information System (INIS)

    Takamatsu, Hiroshi

    1999-01-01

    Since first PWR in Japan started commercial operation in 1970, we have encountered the various modes of corrosion on primary and secondary side components. We have paid much efforts for resolving these corrosion problems, that is, investigating the causes of corrosion and establishing the countermeasures for these corrosion. We summarize these efforts in this article. (author)

  6. Status of developing advanced PWR in Japan

    International Nuclear Information System (INIS)

    Iida, Yotaro

    1982-01-01

    During past eleven years since the first PWR power plant, Mihama Unit 1 of Kansai Electric Power Co., started the commercial operation in 1970, Mitsubishi Heavy Industries has endeavored to improve PWR technologies on the basis of the advice from electric power companies and the technical information to overcome difficulties in PWR power plants. Now, the main objective is to improve the overall plant performance, and the rate of operation of Japanese PWR power plants has significantly risen. The improvement of the reliability, the shortening of regular inspection period and the reduction of radioactive waste handling were attempted. In view of the satisfactory operational experience of Westinghouse type PWRs, the basic reactor concept has not been changed so far. Mitsubishi and Westinghouse reached basic agreement in August, 1981, to develop a spectral shift type large capacity reactor as the advanced PWRs for Japan. This type of PWRs hab higher degree of freedom for extended fuel cycle operation and enhances the advantage of entire fuel cycle economy, particularly the significant reduction of uranium use. The improved neutron economy is attainable by reducing neutron loss, and the core design with low power density and the economical use of plutonium are advantageous for the fuel cycle economy. (Kako, I.)

  7. An evaluation of tight - pitch PWR cores

    International Nuclear Information System (INIS)

    Correa, F.

    1980-01-01

    The subtask of a project carried out at MIT (Massachusetts Institute of Technology) for DOE (Department of Energy) as part of their NASAP/INFCE - related effects involving the optimization of PWR lattices in the recycle model is summarized. (E.G.) [pt

  8. Comprehensive comparing percutaneous endoscopic lumbar discectomy with posterior lumbar internal fixation for treatment of adjacent segment lumbar disc prolapse with stable retrolisthesis

    Science.gov (United States)

    Sun, Yapeng; Zhang, Wei; Qie, Suhui; Zhang, Nan; Ding, Wenyuan; Shen, Yong

    2017-01-01

    Abstract The study was to comprehensively compare the postoperative outcome and imaging parameter characters in a short/middle period between the percutaneous endoscopic lumbar discectomy (PELD) and the internal fixation of bone graft fusion (the most common form is posterior lumbar interbody fusion [PLIF]) for the treatment of adjacent segment lumbar disc prolapse with stable retrolisthesis after a previous lumbar internal fixation surgery. In this retrospective case-control study, we collected the medical records from 11 patients who received PELD operation (defined as PELD group) for and from 13 patients who received the internal fixation of bone graft fusion of lumbar posterior vertebral lamina decompression (defined as control group) for the treatment of the lumbar disc prolapse combined with stable retrolisthesis at Department of Spine Surgery, the Third Hospital of Hebei Medical University (Shijiazhuang, China) from May 2010 to December 2015. The operation time, the bleeding volume of perioperation, and the rehabilitation days of postoperation were compared between 2 groups. Before and after surgery at different time points, ODI, VAS index, and imaging parameters (including Taillard index, inter-vertebral height, sagittal dislocation, and forward bending angle of lumbar vertebrae) were compared. The average operation time, the blooding volume, and the rehabilitation days of postoperation were significantly less in PELD than in control group. The ODI and VAS index in PELD group showed a significantly immediate improving on the same day after the surgery. However, Taillard index, intervertebral height, sagittal dislocation in control group showed an immediate improving after surgery, but no changes in PELD group till 12-month after surgery. The forward bending angle of lumbar vertebrae was significantly increased and decreased in PELD and in control group, respectively. PELD operation was superior in terms of operation time, bleeding volume, recovery period

  9. Comprehensive comparing percutaneous endoscopic lumbar discectomy with posterior lumbar internal fixation for treatment of adjacent segment lumbar disc prolapse with stable retrolisthesis: A retrospective case-control study.

    Science.gov (United States)

    Sun, Yapeng; Zhang, Wei; Qie, Suhui; Zhang, Nan; Ding, Wenyuan; Shen, Yong

    2017-07-01

    The study was to comprehensively compare the postoperative outcome and imaging parameter characters in a short/middle period between the percutaneous endoscopic lumbar discectomy (PELD) and the internal fixation of bone graft fusion (the most common form is posterior lumbar interbody fusion [PLIF]) for the treatment of adjacent segment lumbar disc prolapse with stable retrolisthesis after a previous lumbar internal fixation surgery.In this retrospective case-control study, we collected the medical records from 11 patients who received PELD operation (defined as PELD group) for and from 13 patients who received the internal fixation of bone graft fusion of lumbar posterior vertebral lamina decompression (defined as control group) for the treatment of the lumbar disc prolapse combined with stable retrolisthesis at Department of Spine Surgery, the Third Hospital of Hebei Medical University (Shijiazhuang, China) from May 2010 to December 2015. The operation time, the bleeding volume of perioperation, and the rehabilitation days of postoperation were compared between 2 groups. Before and after surgery at different time points, ODI, VAS index, and imaging parameters (including Taillard index, inter-vertebral height, sagittal dislocation, and forward bending angle of lumbar vertebrae) were compared.The average operation time, the blooding volume, and the rehabilitation days of postoperation were significantly less in PELD than in control group. The ODI and VAS index in PELD group showed a significantly immediate improving on the same day after the surgery. However, Taillard index, intervertebral height, sagittal dislocation in control group showed an immediate improving after surgery, but no changes in PELD group till 12-month after surgery. The forward bending angle of lumbar vertebrae was significantly increased and decreased in PELD and in control group, respectively.PELD operation was superior in terms of operation time, bleeding volume, recovery period, and financial

  10. Identification of an Internal Ribosome Entry Segment in the 5′ Region of the Mouse VL30 Retrotransposon and Its Use in the Development of Retroviral Vectors

    Science.gov (United States)

    López-Lastra, Marcelo; Ulrici, Sandrine; Gabus, Caroline; Darlix, Jean-Luc

    1999-01-01

    Mouse virus-like 30S RNAs (VL30m) constitute a family of retrotransposons, present at 100 to 200 copies, dispersed in the mouse genome. They display little sequence homology to Moloney murine leukemia virus (MoMLV), do not encode virus-like proteins, and have not been implicated in retroviral carcinogenesis. However, VL30 RNAs are efficiently packaged into MLV particles that are propagated in cell culture. In this study, we addressed whether the 5′ region of VL30m could replace the 5′ leader of MoMLV functionally in a recombinant vector construct. Our data confirm that the putative packaging sequence of VL30 is located within the 5′ region (nucleotides 362 to 1149 with respect to the cap structure) and that it can replace the packaging sequence of MoMLV. We also show that VL30m contains an internal ribosome entry segment (IRES) in the 5′ region, as do MoMLV, Friend murine leukemia virus, Harvey murine sarcoma virus, and avian reticuloendotheliosis virus type A. Our data show that both the packaging and IRES functions of the 5′ region of VL30m RNA can be efficiently used to develop retrotransposon-based vectors. PMID:10482590

  11. Identification of an internal ribosome entry segment in the 5' region of the mouse VL30 retrotransposon and its use in the development of retroviral vectors.

    Science.gov (United States)

    López-Lastra, M; Ulrici, S; Gabus, C; Darlix, J L

    1999-10-01

    Mouse virus-like 30S RNAs (VL30m) constitute a family of retrotransposons, present at 100 to 200 copies, dispersed in the mouse genome. They display little sequence homology to Moloney murine leukemia virus (MoMLV), do not encode virus-like proteins, and have not been implicated in retroviral carcinogenesis. However, VL30 RNAs are efficiently packaged into MLV particles that are propagated in cell culture. In this study, we addressed whether the 5' region of VL30m could replace the 5' leader of MoMLV functionally in a recombinant vector construct. Our data confirm that the putative packaging sequence of VL30 is located within the 5' region (nucleotides 362 to 1149 with respect to the cap structure) and that it can replace the packaging sequence of MoMLV. We also show that VL30m contains an internal ribosome entry segment (IRES) in the 5' region, as do MoMLV, Friend murine leukemia virus, Harvey murine sarcoma virus, and avian reticuloendotheliosis virus type A. Our data show that both the packaging and IRES functions of the 5' region of VL30m RNA can be efficiently used to develop retrotransposon-based vectors.

  12. Characterization of an internal ribosomal entry segment within the 5' leader of avian reticuloendotheliosis virus type A RNA and development of novel MLV-REV-based retroviral vectors.

    Science.gov (United States)

    López-Lastra, M; Gabus, C; Darlix, J L

    1997-11-01

    The murine leukemia virus (MLV)-related type C viruses constitute a major class of retroviruses that includes numerous endogenous and exogenous mammalian viruses and the related avian spleen necrosis virus (SNV). The MLV-related viruses possess a long and multifunctional 5' untranslated leader involved in key steps of the viral life cycle--splicing, translation, RNA dimerization, encapsidation, and reverse transcription. Recent studies have shown that the 5' leader of Friend murine leukemia virus and Moloney murine leukemia virus can direct cap independent translation of gag precursor proteins (Berlioz et al., 1995; Vagner et al., 1995b). These data, together with structural homology studies (Koning et al., 1992), prompted us to undertake a search for new internal ribosome entry segment (IRES) of retroviral origin. Here we describe an IRES element within the 5' leader of avian reticuloendotheliosis virus type A (REV-A) genomic RNA. Data show that the REV-A 5' IRES element maps downstream of the packaging/dimerization (E/DLS) sequence (Watanabe and Temin, 1982; Darlix et al., 1992) and the minimal IRES sequence appears to be within a 129 nt fragment (nucleotides 452-580) of the 5' leader, immediately upstream of the gag AUG codon. The REV-A IRES has been successfully utilized in the construction of novel high titer MLV-based retroviral vectors, containing one or more IRES elements of retroviral origin. These retroviral constructs, which represent a starting point for the design of novel vectors suitable for gene therapy, are also of interest as a model system of internal translation initiation and its possible regulation during development, cancer, or virus infection.

  13. The design of a compact integral medium size PWR

    International Nuclear Information System (INIS)

    Shirvan, Koroush; Hejzlar, Pavel; Kazimi, Mujid S.

    2012-01-01

    Highlights: ► We model the IRIS reactor in RELAP5 and VIPRE codes. ► We use Printed Circuit Heat Exchangers and internally and externally cooled fuel pins in IRIS. ► We increase the IRIS power by 50% and demonstrate adequate safety performance. ► We show significant potential gain in economics for any integral PWR reactor design. - Abstract: Integral reactors have been proposed in recent years as a means to eliminate loss of coolant events, and reduce the number of large vessels of a nuclear power plant. In this paper the focus on how to further increase the power that can be derived from a given vessel volume. The example is applied to the International Reactor Innovative and Secure (IRIS), a medium size, light water reactor rated at 1000 MWt. The IRIS is an integral design containing all pumps and steam generators along with a traditional PWR core inside the reactor vessel. IRIS was designed with 8 Once-Through Helically Coiled Steam Generators (OTHSG), located above the core, in an annular region between the riser and the pressure vessel wall. This work examines ideas to increase its power output in the same vessel size while maintaining or improving the safety margins. The combination of Printed Circuit Heat Exchangers (PCHE) and Internally and EXternally cooled Annular Fuel (IXAF) is proposed to implement such improvement in otherwise the reference IRIS design. Safety implications of such steam generator and fuel design changes for the same reactor size are examined, under both steady state and transients, using the RELAP5 and VIPRE codes. It is found that the IRIS reactor power can be increased by 50% by using the PCHE and IXAF. The proposed design is found to be less expensive per unit electric power produced, these improvements and analyses can be applied to any integral reactor design.

  14. The verification of PWR-fuel code for PWR in-core fuel management

    International Nuclear Information System (INIS)

    Surian Pinem; Tagor M Sembiring; Tukiran

    2015-01-01

    In-core fuel management for PWR is not easy because of the number of fuel assemblies in the core as much as 192 assemblies so many possibilities for placement of the fuel in the core. Configuration of fuel assemblies in the core must be precise and accurate so that the reactor operates safely and economically. It is necessary for verification of PWR-FUEL code that will be used in-core fuel management for PWR. PWR-FUEL code based on neutron transport theory and solved with the approach of multi-dimensional nodal diffusion method many groups and diffusion finite difference method (FDM). The goal is to check whether the program works fine, especially for the design and in-core fuel management for PWR. Verification is done with equilibrium core search model at three conditions that boron free, 1000 ppm boron concentration and critical boron concentration. The result of the average burn up fuel assemblies distribution and power distribution at BOC and EOC showed a consistent trend where the fuel with high power at BOC will produce a high burn up in the EOC. On the core without boron is obtained a high multiplication factor because absence of boron in the core and the effect of fission products on the core around 3.8 %. Reactivity effect at 1000 ppm boron solution of BOC and EOC is 6.44 % and 1.703 % respectively. Distribution neutron flux and power density using NODAL and FDM methods have the same result. The results show that the verification PWR-FUEL code work properly, especially for core design and in-core fuel management for PWR. (author)

  15. Mixed segmentation

    DEFF Research Database (Denmark)

    Hansen, Allan Grutt; Bonde, Anders; Aagaard, Morten

    content analysis and audience segmentation in a single-source perspective. The aim is to explain and understand target groups in relation to, on the one hand, emotional response to commercials or other forms of audio-visual communication and, on the other hand, living preferences and personality traits...

  16. Evaluation of fire probabilistic safety assessment for a PWR plant

    International Nuclear Information System (INIS)

    Wu, C.H.; Lin, T.J.; Kao, T.M.

    2001-01-01

    The internal fire analysis of the level 1 power operation probability safety assessment (PSA) for Maanshan (PWR) Nuclear Power Plant (MNPP) was updated. The fire analysis adopted a scenario-based PSA approach to systematically evaluate fire and smoke hazards and their associated risk impact to MNPP. The result shows that the core damage frequency (CDF) due to fire is about six times lower than the previous one analyzed by the Atomic Energy Council (AEC), Republic of China in 1987. The plant model was modified to reflect the impact of human events and recovery actions during fire. Many tabulated EXCEL spread-sheets were used for evaluation of the fire risk. The fire-induced CDF for MNPP is found to be 2.1 E-6 per year in this study. The relative results of the fire analysis will provide the bases for further risk-informed fire protection evaluation in the near future. (author)

  17. PWR reactor vessel in-service-inspection according to RSEM

    International Nuclear Information System (INIS)

    Algarotti, Marc; Dubois, Philippe; Hernandez, Luc; Landez, Jean Paul

    2006-01-01

    Nuclear services experience Framatome ANP (an AREVA and Siemens company) has designed and constructed 86 Pressurized Water Reactors (PWR) around the world including the three units lately commissioned at Ling Ao in the People's Republic of China and ANGRA 2 in Brazil; the company provided general and specialized outage services supporting numerous outages. Along with the American and German subsidiaries, Framatome ANP Inc. and Framatome ANP GmbH, Framatome ANP is among the world leading nuclear services providers, having experience of over 500 PWR outages on 4 continents, with current involvement in more than 50 PWR outages per year. Framatome ANP's experience in the examinations of reactor components began in the 1970's. Since then, each unit (American, French and German companies) developed automated NDT inspection systems and carried out pre-service and ISI (In-Service Inspections) using a large range of NDT techniques to comply with each utility expectations. These techniques have been validated by the utilities and the safety authorities of the countries where they were implemented. Notably Framatome ANP is fully qualified to provide full scope ISI services to satisfy ASME Section XI requirements, through automated NDE tasks including nozzle inspections, reactor vessel head inspections, steam generator inspections, pressurizer inspections and RPV (Reactor Pressure Vessel) inspections. Intercontrole (Framatome ANP subsidiary dedicated in supporting ISI) is one of the leading NDT companies in the world. Its main activity is devoted to the inspection of the reactor primary circuit in French and foreign PWR Nuclear Power Plants: the reactor vessel, the steam generators, the pressurizer, the reactor internals and reactor coolant system piping. NDT methods mastered by Intercontrole range from ultrasonic testing to eddy current and gamma ray examinations, as well as dye penetrant testing, acoustic monitoring and leak testing. To comply with the high requirements of

  18. The PWR spectral code GELS. Pt. 1

    International Nuclear Information System (INIS)

    Penndorf, K.; Schult, F.; Schulz, G.

    1976-01-01

    The code procedures group constant libraries for the static PWR design of whatever fuel cycle - Uranium, Thorium, or Plutonium. The whole reach of temperatures is covered and the treatment of strong lumped absorbers as control or burnable poison pins is included. The main features are: 1) Good accuracy in spite of not fitting the material data to critical experiments; 2) speed and relatively low computer equipment; 3) restriction to PWR's only. In case of demands for higher accuracy there is a further restriction concerning the library data of the epithermal resonance absorbers: They are strictly valid only for several special lattice geometrics. Three samples are given each representing a typical application of the code. Two of them likewise are demonstrations of recalculated experiments. (orig.) [de

  19. Fuel management optimization for a PWR

    International Nuclear Information System (INIS)

    Dumas, M.; Robeau, D.

    1981-04-01

    This study is aimed to optimize the refueling pattern of a PWR. Two methods are developed, they are based on a linearized form of the optimization problem. The first method determines a feasible solution in two steps; in the first one the original problem is replaced by a relaxed one which is solved by the Method of Approximation Programming. The second step is based on the Branch and Bound method to find the feasible solution closest to the solution obtained in the first step. The second method starts from a given refueling pattern and tries to improve this pattern by the calculation of the effects of 2 by 2, 3 by 3 and 4 by 4 permutations on the objective function. Numerical results are given for a typical PWR refueling using the two methods

  20. RSK-guidelines for PWR reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The RSK guidelines for PWA reactors of April 24, 1974, have been revised and amended in this edition. The RSK presents a summary of safety requirements to be observed in the design, construction, and operation of PWR reactors in the form of guidelines. From January 1979 onwards these guidelines will be the basis of siting and safety considerations for new PWR reactors, and newly built nuclear power plants will have to form these guidelines. They are not binding for existing nuclear power plants under construction or in operation. It will be a matter of individual discussion whether or not the guidelines will be applied in these plants. The main purpose of the guidelines is to facilitate discussion among RSK members and to give early information on necessary safety requirements. If the guidelines are observed by producers and operators, the RSK will make statements on individual projects at short notice. (orig./HP) [de

  1. Optimization of reload core design for PWR

    International Nuclear Information System (INIS)

    Shen Wei; Xie Zhongsheng; Yin Banghua

    1995-01-01

    A direct efficient optimization technique has been effected for automatically optimizing the reload of PWR. The objective functions include: maximization of end-of-cycle (EOC) reactivity and maximization of average discharge burnup. The fuel loading optimization and burnable poison (BP) optimization are separated into two stages by using Haling principle. In the first stage, the optimum fuel reloading pattern without BP is determined by the linear programming method using enrichments as control variable, while in the second stage the optimum BP allocation is determined by the flexible tolerance method using the number of BP rods as control variable. A practical and efficient PWR reloading optimization program based on above theory has been encoded and successfully applied to Qinshan Nuclear Power Plant (QNP) cycle 2 reloading design

  2. Zircaloy oxidation and cladding deformation in PWR-specific CORA experiments

    International Nuclear Information System (INIS)

    Minato, K.; Hering, W.; Hagen, S.

    1991-07-01

    Out-of-pile bundle experiments (zircaloy 4) are performed in the CORA facility to investigate the behavior of PWR fuel elements during severe fuel damage (SFD) accidents. Within the international cooperation the most significant phenomena such as cladding deformation, oxidation (especially the zirconium/steam reaction), melt formation, melt release, and relocation which were found in all tests have been analyzed. (orig./MM) [de

  3. The secondary water chemistry and its quality specification of PWR steam generators

    International Nuclear Information System (INIS)

    Zhang Guiqin.

    1984-01-01

    Reasonably organizing the secondary water chemistry of a steam generator is of great importance for improving thermal-hydraulic characteristics and avoiding or alleviating probability of its internals failures by corrosion. In this paper emphasis is put on importance and task of the secondary water chemistry, the meaning and the control demand for feedwater and boiler water specification. At the same time, the current situation on the secondary water chemistry of PWR steam generators is reviewed generally. (Author)

  4. PWR fuel behavior: lessons learned from LOFT

    International Nuclear Information System (INIS)

    Russell, M.L.

    1981-01-01

    A summary of the experience with the Loss-of-Fluid Test (LOFT) fuel during loss-of-coolant experiments (LOCEs), operational and overpower transient tests and steady-state operation is presented. LOFT provides unique capabilities for obtaining pressurized water reactor (PWR) fuel behavior information because it features the representative thermal-hydraulic conditions which control fuel behavior during transient conditions and an elaborate measurement system to record the history of the fuel behavior

  5. EDF/CIDEN - ONECTRA: PWR decontamination

    International Nuclear Information System (INIS)

    Fayolle, P.; Orcel, H.; Wertz, L.

    2010-01-01

    In the context of PWR circuit renewal (expected in 2011) and their decontamination, an analysis of data coming from cartography and on site decontamination measurements as well as from premise modelling by means of the PANTHERE radioprotection code, is presented. Several French PWRs have been studied. After a presentation of code principles and operation, the authors discuss the radiological context of a workstation, and give an assessment of the annual dose associated with maintenance operations with or without decontamination

  6. EPRI PWR primary water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Fruzzetti, Keith

    2014-01-01

    EPRI periodically updates the PWR Primary Water Chemistry Guidelines as new information becomes available and as required by NEI 97-06 (Steam Generator Program Guidelines) and NEI 03-08 (Guideline for the Management of Materials Issues). The last revision of the PWR water chemistry guidelines identified an optimum primary water chemistry program based on then-current understanding of research and field information. This new revision provides further details with regard to primary water stress corrosion cracking (PWSCC), fuel integrity, and shutdown dose rates. A committee of industry experts, including utility specialists, nuclear steam supply system (NSSS) and fuel vendor representatives, Institute of Nuclear Power Operations (INPO) representatives, consultants, and EPRI staff collaborated in reviewing the available data on primary water chemistry, reactor water coolant system materials issues, fuel integrity and performance issues, and radiation dose rate issues. From the data, the committee updated the water chemistry guidelines that all PWR nuclear plants should adopt. The committee revised guidance with regard to optimization to reflect industry experience gained since the publication of Revision 6. Among the changes, the technical information regarding the impact of zinc injection on PWSCC initiation and dose rate reduction has been updated to reflect the current level of knowledge within the industry. Similarly, industry experience with elevated lithium concentrations with regard to fuel performance and radiation dose rates has been updated to reflect data collected to date. Recognizing that each nuclear plant owner has a unique set of design, operating, and corporate concerns, the guidelines committee has retained a method for plant-specific optimization. Revision 7 of the Pressurized Water Reactor Primary Water Chemistry Guidelines provides guidance for PWR primary systems of all manufacture and design. The guidelines continue to emphasize plant

  7. Optimum fuel use in PWR reactors

    International Nuclear Information System (INIS)

    Neubauer, W.

    1979-07-01

    An optimization program was developed to calculate minimum-cost refuelling schedules for PWR reactors. Optimization was made over several cycles, without any constraints (equilibrium cycle). In developing the optimization program, special consideration was given to an individual treatment of every fuel element and to a sufficiently accurate calculation of all the data required for safe reactor operation. The results of the optimization program were compared with experimental values obtained at Obrigheim nuclear power plant. (orig.) [de

  8. Chemical and radiochemical specifications - PWR power plants

    International Nuclear Information System (INIS)

    Stutzmann, A.

    1997-01-01

    Published by EDF this document gives the chemical specifications of the PWR (Pressurized Water Reactor) nuclear power plants. Among the chemical parameters, some have to be respected for the safety. These parameters are listed in the STE (Technical Specifications of Exploitation). The values to respect, the analysis frequencies and the time states of possible drops are noticed in this document with the motion STE under the concerned parameter. (A.L.B.)

  9. GAIA: AREVAs New PWR fuel assembly design

    Energy Technology Data Exchange (ETDEWEB)

    Vollmert, N.; Gentet, G.; Louf, P.H.; Mindt, M.; O' Brian, J.; Peucker, J.

    2015-07-01

    GAIA is the label of a new PWR Fuel Assembly design developed by AREVA with the objective to provide its customers an advanced fuel assembly design regarding both robustness and performance. Since 2012 GAIA lead fuel assemblies are under irradiation in a Swedish reactor and since 2015 in a U.S. reactor. Visual inspections and examinations carried out so far during the outages confirmed the intended reliability, robustness and the performance enhancement of the design. (Author)

  10. Shielding design for PWR in France

    International Nuclear Information System (INIS)

    Champion, G.; Charransol; Le Dieu de Ville, A.; Nimal, J.C.; Vergnaud, T.

    1983-05-01

    Shielding calculation scheme used in France for PWR is presented here for 900 MWe and 1300 MWe plants built by EDF the French utility giving electricity. Neutron dose rate at areas accessible by personnel during the reactor operation is calculated and compared with the measurements which were carried out in 900 MWe units up to now. Measurements on the first French 1300 MWe reactor are foreseen at the end of 1983

  11. Organization patterns of PWR power plants

    International Nuclear Information System (INIS)

    Leicman, J.

    1980-01-01

    Organization patterns are shown for the St. Lucia 1, North Anna, Sequoyah, and Beaver Valley nuclear power plants, for a typical PWR power plant in the USA, for the Biblis/RWE-KWU nuclear power plants and for a four-unit nuclear power plant operated by Electricite de France as well as for the Loviisa power plant. Organization patterns are also shown for relatively independent and non-independent nuclear power plants according to IAEA recommendations. (J.P.)

  12. Sensitivity analysis of a PWR pressurizer

    International Nuclear Information System (INIS)

    Bruel, Renata Nunes

    1997-01-01

    A sensitivity analysis relative to the parameters and modelling of the physical process in a PWR pressurizer has been performed. The sensitivity analysis was developed by implementing the key parameters and theoretical model lings which generated a comprehensive matrix of influences of each changes analysed. The major influences that have been observed were the flashing phenomenon and the steam condensation on the spray drops. The present analysis is also applicable to the several theoretical and experimental areas. (author)

  13. T Plant removal of PWR Chiller Subsystem

    International Nuclear Information System (INIS)

    Dana, C.M.

    1994-01-01

    The PWR Pool Chiller System is not longer required for support of the Shippingport Blanket Fuel Assemblies Storage. The Engineering Work Plan will provide the overall coordination of the documentation and physical changes to deactivate the unneeded subsystem. The physical removal of all energy sources for the Chiller equipment will be covered under a one time work plan. The documentation changes will be covered using approved Engineering Change Notices and Procedure Change Authorizations as needed

  14. Modelling activity transport behavior in PWR plant

    International Nuclear Information System (INIS)

    Henshaw, Jim; McGurk, John; Dickinson, Shirley; Burrows, Robert; Hinds, Kelvin; Hussey, Dennis; Deshon, Jeff; Barrios Figueras, Joan Pau; Maldonado Sanchez, Santiago; Fernandez Lillo, Enrique; Garbett, Keith

    2012-09-01

    The activation and transport of corrosion products around a PWR circuit is a major concern to PWR plant operators as these may give rise to high personnel doses. The understanding of what controls dose rates on ex-core surfaces and shutdown releases has improved over the years but still several questions remain unanswered. For example the relative importance of particle and soluble deposition in the core to activity levels in the plant is not clear. Wide plant to plant and cycle to cycle variations are noted with no apparent explanations why such variations are observed. Over the past few years this group have been developing models to simulate corrosion product transport around a PWR circuit. These models form the basis for the latest version of the BOA code and simulate the movement of Fe and Ni around the primary circuit. Part of this development is to include the activation and subsequent transport of radioactive species around the circuit and this paper describes some initial modelling work in this area. A simple model of activation, release and deposition is described and then applied to explain the plant behaviour at Sizewell B and Vandellos II. This model accounts for activation in the core, soluble and particulate activity movement around the circuit and for activity capture ex-core on both the inner and outer oxides. The model gives a reasonable comparison with plant observations and highlights what controls activity transport in these plants and importantly what factors can be ignored. (authors)

  15. The Conceptual Design of Innovative Safe PWR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Han-Gon [Centural Research Institute, Daejeon (Korea, Republic of); Heo, Sun [Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2016-10-15

    Most of countries operating NPPs have been performed post-Fukushima improvements as short-term countermeasure to enhance the safety of operating NPPs. Separately, vendors have made efforts on developing passive safety systems as long-term and ultimate countermeasures. AP1000 designed by Westinghouse Electric Company has passive safety systems including the passive emergency core cooling system (PECCS), the passive residual heat removal system (PRHRS), and the passive containment cooling system (PCCS). ESBWR designed by GE-Hitachi also has passive safety systems consisting of the isolation condenser system, the gravity driven cooling system and the PCCS. Other countries including China and Russia have made efforts on developing passive safety systems for enhancing the safety of their plants. In this paper, we summarize the design goals and main design feature of innovative safe PWR, iPOWER which is standing for Innovative Passive Optimized World-wide Economical Reactor, and show the developing status and results of research projects. To mitigate an accident without electric power and enhance the safety level of PWR, the conceptual designs of passive safety system and innovative safe PWR have been performed. It includes the PECCS for core cooling and the PCCS for containment cooling. Now we are performing the small scale and separate effect tests for the PECCS and the PCCS and preparing the integral effect test for the PECCS and real scale test for the PCCS.

  16. Materials performance in operating PWR steam generators

    International Nuclear Information System (INIS)

    Weeks, J.R.

    1975-01-01

    The Inconel-600 tubing in operating PWR steam generators has developed leaks due to intergranular stress corrosion cracking or a general wastage attack, originating from the secondary side of the tubing. Corrosion has been limited to those areas of the steam generators where limited coolant circulation and high heat flux have caused impurities to concentrate. Wastage or pitting attack has always been associated with local concentration of sodium hydrogen phosphates, whereas stress corrosion has been associated with local concentration of sodium or potassium hydroxides. The only instance of stress corrosion originating from the primary side occurred on cold-worked tubing when hydrogen was not added to getter oxygen, and LiOH was not added to raise the pH of the primary coolant. All PWR manufacturers are now recommending that the phosphate treatment of the secondary coolant be abandoned in favor of an all-volatile treatment. Experience in operating plants has shown, however, that removal of phosphate-rich sludge deposits is difficult, and that further wastage and/or intergranular stress corrosion may develop; the residual sodium phosphates gradually convert by reaction with corrosion product hydroxides to sodium hydroxide, which remains concentrated in the limited flow areas. Improvements in circulation patterns have been achieved by inserting flow baffles in some PWR steam generators. Inservice monitoring by eddy current techniques is useful for detecting corrosion-induced defects in the tubing, but irreproducibility in field examinations can lead to uncertainties interpreting the results. (U.S.)

  17. Implementation in free software of the PWR type university nucleo electric simulator (SU-PWR)

    International Nuclear Information System (INIS)

    Valle H, J.; Hidago H, F.; Morales S, J.B.

    2007-01-01

    Presently work is shown like was carried out the implementation of the University Simulator of Nucleo-electric type PWR (SU-PWR). The implementation of the simulator was carried out in a free software simulation platform, as it is Scilab, what offers big advantages that go from the free use and without cost of the product, until the codes modification so much of the system like of the program with the purpose of to improve it or to adapt it to future routines and/or more advanced graphic interfaces. The SU-PWR shows the general behavior of a PWR nuclear plant (Pressurized Water Reactor) describing the dynamics of the plant from the generation process of thermal energy in the nuclear fuel, going by the process of energy transport toward the coolant of the primary circuit the one which in turn transfers this energy to the vapor generators of the secondary circuit where the vapor is expanded by means of turbines that in turn move the electric generator producing in this way the electricity. The pressurizer that is indispensable for the process is also modeled. Each one of these stages were implemented in scicos that is the Scilab tool specialized in the simulation. The simulation was carried out by means of modules that contain the differential equation that mathematically models each stage or equipment of the PWR plant. The result is a series of modules that based on certain entrances and characteristic of the system they generate exits that in turn are the entrance to other module. Because the SU-PWR is an experimental project in early phase, it is even work and modifications to carry out, for what the models that are presented in this work can vary a little the being integrated to the whole system to simulate, but however they already show clearly the operation and the conformation of the plant. (Author)

  18. Activity transport models for PWR primary circuits; PWR-ydinvoimalaitoksen primaeaeripiirin aktiivisuuskulkeutumismallit

    Energy Technology Data Exchange (ETDEWEB)

    Tanner, V; Rosenberg, R [VTT Chemical Technology, Otaniemi (Finland)

    1995-03-01

    The corrosion products activated in the primary circuit form a major source of occupational radiation dose in the PWR reactors. Transport of corrosion activity is a complex process including chemistry, reactor physics, thermodynamics and hydrodynamics. All the mechanisms involved are not known and there is no comprehensive theory for the process, so experimental test loops and plant data are very important in research efforts. Several activity transport modelling attempts have been made to improve the water chemistry control and to minimise corrosion in PWR`s. In this research report some of these models are reviewed with special emphasis on models designed for Soviet VVER type reactors. (51 refs., 16 figs., 4 tabs.).

  19. Program of monitoring PWR fuel in Spain; Programa de Vigilancia de Combustible pwr en Espana

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Murillo, J. C.; Quecedo, M.; Munoz-Roja, C.

    2015-07-01

    In the year 2000 the PWR utilities: Centrales Nucleares Almaraz-Trillo (CNAT) and Asociacion Nuclear Asco-Vandellos (ANAV), and ENUSA Industrias Avanzadas developed and executed a coordinated strategy named PIC (standing for Coordinated Research Program), for achieving the highest level of fuel reliability. The paper will present the scope and results of this program along the years and will summarize the way the changes are managed to ensure fuel integrity. The excellent performance of the ENUSA manufactured fuel in the PWR Spanish NPPs is the best indicator that the expectations on this program are being met. (Author)

  20. German-French PWR cooperation

    International Nuclear Information System (INIS)

    Ruess, F.; Vignon, D.

    1990-01-01

    In April 1989, the two leading European nuclear power plant vendors, Framatome and Siemens, signed an agreement on cooperation covering the joint development and worldwide marketing of pressurized water reactors. For this purpose a joint subsidiary, Nuclear Power International (NPI) was founded, in which equal interests are held by Framatome and Siemens. The firm has its headquarters in Paris and another sales office in Erlangen. Its main activities are the coordination of the development of a joint advanced pressurized water reactor technology and the marketing of pressurized water reactors. Until the joint technology under development has reached commercial maturity, the lines so far developed by the parent companies will continue to be distributed. (orig.) [de

  1. Radiation risk analysis of tritium in PWR plants

    International Nuclear Information System (INIS)

    Yang Maochun; Wang Shimin

    1999-03-01

    Tritium is a common radionuclide in PWR nuclear power plant. In the normal operation conditions, its radiation risk to plant workers is the internal radiation exposure when tritium existing in air as HTO (hydrogen tritium oxide) is breathed in. As the HTO has the same physical and chemical characteristics as water, the main way that HTO entering the air is by evaporation. There are few opening systems in Nuclear Power Plant, the radiation risk of tritium mainly exists near the area of spent fuel pit and reactor pit. The highest possible radiation risk it may cause--the maximum concentration in air is the level when equilibrium is established between water and air phases for tritium. The author analyzed the relationship among the concentration of HTO in water, in air and the water temperature when equilibrium is established, the equilibrated HTO concentration in air increases with HTO concentration in water and water temperature. The analysis revealed that at 30 degree C, the equilibrated HTO concentration in air might reach 1 DAC (derived air concentration) when the HTO concentration in water is 28 GBq/m 3 . Owing to the operation of plant ventilation systems and the existence of moisture in the input air of the ventilation, the practical tritium concentration in air is much lower than its equilibrated levels, the radiation risk of tritium in PWR plant is quite limited. In 1997, Daya Bay Nuclear Power Plant's practical monitoring result of the HTO concentration in the air of the nuclear island and the urine of workers supported this conclusion. Based on this analysis, some suggestions to the reduction of tritium radiation risk were made

  2. Brookhaven segment interconnect

    International Nuclear Information System (INIS)

    Morse, W.M.; Benenson, G.; Leipuner, L.B.

    1983-01-01

    We have performed a high energy physics experiment using a multisegment Brookhaven FASTBUS system. The system was composed of three crate segments and two cable segments. We discuss the segment interconnect module which permits communication between the various segments

  3. IFRS 8 Operating Segments - A Closer Look

    OpenAIRE

    Muthupandian, K S

    2008-01-01

    The International Accounting Standards Board issued the International Financial Reporting Standard 8 Operating Segments. Segment information is one of the most vital aspects of financial reporting for investors and other users. The IFRS 8 requires an entity to adopt the ‘management approach’ to reporting on the financial performance of its operating segments. This article presents a closer look of the standard (objective, scope, and disclosures).

  4. Study of anticipated transient without scram for PWR

    International Nuclear Information System (INIS)

    Pu Jilong.

    1985-01-01

    Anticipated Transient Without Scram (ATWS) of PWR, the one of the 'Unresolved Safety Issue' with NRC, has been investigated for many years. The latest analysis done by the author considers the PWR's inherent stability and long-term performence under the condition of ATWS combined with SBLOCA and studies the sensitivity of several assumptions, which shows positive results

  5. Pushing back the boundaries of PWR fuel performance

    International Nuclear Information System (INIS)

    Sofer, G.A.; Skogen, F.B.; Brown, C.A.; Fresk, Y.U.

    1985-01-01

    In today's fiercely competitive PWR reload market utilities are benefiting from a variety of design innovations which are helping to cut fuel cycle costs and to improve fuel performance. An advanced PWR fuel design from Exxon, for example, currently under evaluation at the Ginna plant in the United States, offers higher burn-up and greater power cycling. (author)

  6. Highlights of the French program on PWR fuel

    Energy Technology Data Exchange (ETDEWEB)

    Pages, J P [CEA Centre d` Etudes de Cadarache, 13 - Saint-Paul-lez-Durance (France). Direction des Reacteurs Nucleaires

    1997-12-01

    The presentation reviews the French programme on PWR fuel including the overall results of the year 1996 for nuclear operation; fuel management and economy; French nuclear electricity generation sites; production of nuclear generated electricity; energy availability of the 900 and 1,300 Mw PWR units; average radioactive liquid releases excluding tritium per unit; plutonium recycling experience.

  7. An economic analysis code used for PWR fuel cycle

    International Nuclear Information System (INIS)

    Liu Dingqin

    1989-01-01

    An economic analysis code used for PWR fuel cycle is developed. This economic code includes 12 subroutines representing vavious processes for entire PWR fuel cycle, and indicates the influence of the fuel cost on the cost of the electricity generation and the influence of individual process on the sensitivity of the fuel cycle cost

  8. Sizewell: proposed site for Britain's first PWR power station

    International Nuclear Information System (INIS)

    1980-10-01

    The pamphlet covers the following points, very briefly: nuclear power - a success story; the Government's nuclear programme; why Sizewell; the PWR (with diagram); the PWR at Sizewell (with aerial view) (location; size; cooling water; road access; fuel transport; construction; employment; environment; screening; the next steps (licensing procedures, etc.); safety; further information). (U.K.)

  9. Chemical decontamination solutions: Effects on PWR equipment

    International Nuclear Information System (INIS)

    Pezze, C.M.; Colvin, E.R.; Aspden, R.G.

    1992-01-01

    A critical objective for the nuclear industry is the reduction of personnel exposure to radiation. Reductions have been achieved through industry's radiation management programs including training and radiation awareness concepts. Increased plant maintenance and higher radiation fields at many sites continue to raise concerns. To alleviate the radiation exposure problem, the sources of radiation which contribute to personnel exposure must be removed from the plant. A feasible was of significantly reducing these sources from a Pressurized Water Reactor (PWR) is to chemically decontaminate the entire reactor coolant system (RCS). A program was conducted to determine the technical acceptability of using certain dilute chemical solvent processes for full RCS chemical decontamination. The two processes evaluated were CAN-DEREM and LOMI. The purpose of the program was to define and complete a systematic evaluation of the major issues that need to be addressed for the successful decontamination of the entire RCS and affected portions of the auxiliary systems of a four-loop PWR system. A test program was designed to evaluate the corrosion effects of the two decontamination processes under expected plant conditions. Materials and sample configurations dictated by generic PWR components were evaluated. The testing also included many standard corrosion coupons. The test data were then used to assess the impact of chemical decontamination on the physical condition and operability of the components, equipment and mechanical systems that make up the RCS. An overview of the test program, sample configurations, data and engineering evaluations is presented. The data demonstrate that through detailed engineering evaluations of corrosion data and equipment function, the impact of full RCS chemical decontamination on plant equipment is established

  10. Valve testing for UK PWR safety applications

    International Nuclear Information System (INIS)

    George, P.T.; Bryant, S.

    1989-01-01

    Extensive testing and development has been done by the Central Electricity Generating Board (CEGB) to support the design, construction and operation of Sizewell B, the UK's first PWR. A Blowdown Rig for the Assessment of Valve Operability - (BRAVO) has been constructed at the CEGB Marchwood Engineering Laboratory to reproduce PWR Pressurizer fluid conditions for the full scale testing of Pressurizer Relief System (PRS) valves. A full size tandem pair of Pilot Operated Safety Relief Valves (POSRVs) is being tested under the full range of pressurizer fluid conditions. Tests to date have produced important data on the performance of the valve in its Cold Overpressure protection mode of operation and on methods for the in-service testing of the valve. Also, a full size pressurizer safety valve has been tested under full PRS fluid conditions to develop a methodology for the pre-service testing of the Sizewell valves. Further work will be carried out to develop procedures for the in-service testing of the valve. In the Main Steam Safety Valve test program carried out at the Siemens-KWU Test Facilities, a single MSSV from three potential suppliers was tested under full secondary system conditions. The test results have been analyzed and are reflected in the CEGB's arrangements for the pre-service and in-service testing of the Sizewell MSSVs. Valves required to interrupt pipebreak flow must be qualified for this duty by testing or a combination of testing and analysis. To obtain guidance on the performance of such tests gate and globe valves have been subjected to simulated pipebreaks under PWR primary circuit conditions. In the light of problems encountered with gate valve closure under these conditions, further tests are currently being carried out on the BRAVO facility on a gate valve, in preparation for the full scale flow interruption qualification testing of the Sizewell main steam isolation valve

  11. Transient study of a PWR pressurizer

    International Nuclear Information System (INIS)

    Sotoma, H.

    1973-01-01

    An appropriate method for the calculation and transient performance of the pressurizer of a pressurized water reactor is presented. The study shows a digital program of simulation of pressurizer dynamics based on the First Law of Thermodynamic and Laws of Heat and Mass Transfer. The importance of the digital program that was written for a pressurizer of PWR, lies in the fact that, this can be of practical use in the safety analysis of a reactor of Angra dos Reis type with a power of about 500 M We. (author)

  12. Technical specifications for PWR secondary water chemistry

    International Nuclear Information System (INIS)

    Weeks, J.R.; van Rooyen, D.

    1977-08-01

    The bases for establishing Technical Specifications for PWR secondary water chemistry are reviewed. Whereas extremely stringent control of secondary water needs to be maintained to prevent denting in some units, sound bases for establishing limits that will prevent stress corrosion, wastage, and denting do not exist at the present time. This area is being examined very thoroughly by industry-sponsored research programs. Based on the evidence available to date, short term control limits are suggested; establishment of these or other limits as Technical Specifications is not recommended until the results of the research programs have been obtained and evaluated

  13. Technical basis for PWR emergency plans forming

    International Nuclear Information System (INIS)

    L'Homme, A.; Manesse, D.; Gauvain, J.; Crabol, B.

    1989-10-01

    Our speech first summarizes the french approach concerning the management of severe accidents which could occur on PWR stations. Then it defines the source-term which is being used as a general support for elaborating the emergency plans devoted to the protection of the population. It describes next the consequences of this source-term on the site and in the environment, which constitute the technical bases for defining actions of utilities and concerned authorities. It gives lastly information on the present status of the different emergency plans and the complementary work undertaken to improve them [fr

  14. Coolant degassing device for PWR type reactors

    International Nuclear Information System (INIS)

    Kita, Kaoru; Takezawa, Kazuaki; Minemoto, Masaki.

    1982-01-01

    Purpose: To efficiently decrease the rare gas concentration in primary coolants, as well as shorten the degassing time required for the periodical inspection in the waste gas processing system of a PWR type reactor. Constitution: Usual degassing method by supplying hydrogen or nitrogen to a volume control tank is replaced with a method of utilizing a degassing tower (method of flowing down processing liquid into the filled tower from above while uprising streams from the bottom of the tower thereby degassing the gases dissolved in the liquid into the steams). The degassing tower is combined with a hydrogen separator or hydrogen recombiner to constitute a waste gas processing system. (Ikeda, J.)

  15. Industrywide survey of PWR organics. Final report

    International Nuclear Information System (INIS)

    Richards, J.E.; Byers, W.A.

    1986-07-01

    Thirteen Pressurized Water reactor (PWR) secondary cycles were sampled for organic acids, total organic carbon, and inorganic anions. The distribution and removal of organics in a makeup water treatment system were investigted at an additional plant. TOC analyses were used for the analysis of makeup water systems; anion ion chromatography and ion exclusion chromatography were used for the analysis of secondary water systems. Additional information on plant operation and water chemistry was collected in a survey. The analytical and survey data were compared and correlations made

  16. Microcomputer simulation of PWR power plant pressurizer

    International Nuclear Information System (INIS)

    Araujo, L.R.A. de; Calixto Neto, J.; Martinez, A.S.; Schirru, R.

    1990-01-01

    It is presented a method for the simulation of the pressurizer behavior of a PWR power plant. The method was implanted in a microcomputer, and it considers all the devices for the pressure control (spray and relief valves, heaters, controller, etc.). The physical phenomena and the PID (Proportional + Integral + Derivative) controller were mathematically represented by linear relations, uncoupled, discretized in the time. There are three different algorithms which take into account the non-linear effects introduced by the variation of the physical properties due to the temperature and pressure, and also the mutual effects between the physical phenomena and the PID controller. (author)

  17. Minimization of PWR reactor control rods wear

    International Nuclear Information System (INIS)

    Ponzoni Filho, Pedro; Moura Angelkorte, Gunther de

    1995-01-01

    The Rod Cluster Control Assemblies (RCCA's) of Pressurized Water Reactors (PWR's) have experienced a continuously wall cladding wear when Reactor Coolant Pumps (RCP's) are running. Fretting wear is a result of vibrational contact between RCCA rodlets and the guide cards which provide lateral support for the rodlets when RCCA's are withdrawn from the core. A procedure is developed to minimize the rodlets wear, by the shuffling and axial reposition of RCCA's every operating cycle. These shuffling and repositions are based on measurement of the rodlet cladding thickness of all RCCA's. (author). 3 refs, 2 figs, 2 tabs

  18. Burst protected nuclear reactor plant with PWR

    International Nuclear Information System (INIS)

    Harand, E.; Michel, E.

    1978-01-01

    In the PWR, several integrated components from the steam raising unit and the main coolant pump are grouped around the reactor pressure vessel in a multiloop circuit and in a vertical arrangement. For safety reasons all primary circuit components and pipelines are situated in burst protection covers. To reduce the area of the plant straight tube steam raising units with forced circulation are used as steam raising units. The boiler pumps are connected to the vertical tubes and to the pressure vessel via double pipelines made as twin chamber pipes. (DG) [de

  19. PWR life time: the EDF project

    International Nuclear Information System (INIS)

    Noel, R.; Reynes, L.; Mercier, J.P.

    1987-01-01

    Operating a very large number of standardized PWR units which supply today 70% of French power generation, Electricite de France is highly interested in getting the best estimate of the safe and economical life of these plants. An extensive program of work has been undertaken in this respect. The studies have first to go through all available data on aging process, survey and maintenance of a limited number of major components. This review will lead to recommendation of complementary work in these fields. The first conclusions are that these units are able to perform a long service time, under provision of careful survey and maintenance [fr

  20. 14C Behaviour in PWR coolant

    International Nuclear Information System (INIS)

    Sims, Howard; Dickinson Shirley; Garbett, Keith

    2012-09-01

    Although 14 C is produced in relatively small amounts in PWR coolant, it is important to know its fate, for example whether it is released by gaseous discharge, removed by absorption on ion exchange (IX) resins or deposited on the fuel pin surfaces. 14 C can exist in a range of possible chemical forms: inorganic carbon compounds (probably mainly CO 2 ), elemental carbon, and organic compounds such as hydrocarbons. This paper presents results from a preliminary survey of the possible reactions of 14 C in PWR coolant. The main conclusions of the study are: - A combination of thermal and radiolytic reactions controls the chemistry of 14 C in reactor coolant. A simple chemical kinetic model predicts that CH 3 OH would be the initial product from radiolytic reactions of 14 C following its formation from 17 O. CH 3 OH is predicted to arise as a result of reactions of OH . with CH 4 and CH 3 , and it persists because there is no known radiation chemical reduction mechanism. - Thermodynamic considerations show that CH 3 OH can be thermally reduced to CH 4 in PWR conditions, although formation of CO 2 from small organics is the most thermodynamically favourable outcome. Such reactions could be catalysed on active nickel surfaces in the primary circuit. - Limited plant data would suggest that CH 4 is the dominant form in PWR and CO 2 in BWR. This implies that radiation chemistry may be important in determining the speciation. - Addition of acetate does not affect the amount of 14 C formed, but the addition of large amounts of stable carbon would lead to a large range of additional products, some of which would be expected to deposit on fuel pin surfaces as high molecular weight hydrocarbons. However, the subsequent thermal decomposition reactions of these products are not known. - Acetate addition may represent a small input of 12 C compared with organic material released from CVCS resins, although the importance of this may depend on whether that is predominantly soluble

  1. Environmental surveillance of PWR power stations

    International Nuclear Information System (INIS)

    Conti, M.

    1980-01-01

    The action of Electricite de France with respect to the environment of PWR nuclear power stations is essentially centred on prevention. Controls are carried out at two levels: - before the power station goes on stream (radioecological study), - when the power station is operational. The purpose of the controls effected on the radioactive effluents and the environment is to check that the maximum discharge rate stipulated in the corresponding orders is complied with and to ensure that there are no anomalies in the environment [fr

  2. Advancing PWR fuel to meet customer needs

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, F W

    1987-03-01

    Since the introduction of the Optimized Fuel Assembly (OFA) for PWRs in the late 1970s, Westinghouse has continued to work with the utility customers to identify the greatest needs for further advance in fuel performance and reliability. The major customer requirements include longer fuel cycle at lower costs, increased fuel discharge burn-up, enhanced operating flexibility, all accompanied by even greater reliability. In response to these needs, Westinghouse developed Vantage 5 PWR fuel. To optimize reactor operations, Vantage 5 fuel features distinct advantages: integral fuel burnable absorbers, axial and radial blankets, intermediate flow mixers, a removable top nozzle, and assembly modifications to accommodate increased discharge burn-up.

  3. SU-E-J-123: Assessing Segmentation Accuracy of Internal Volumes and Sub-Volumes in 4D PET/CT of Lung Tumors Using a Novel 3D Printed Phantom

    International Nuclear Information System (INIS)

    Soultan, D; Murphy, J; James, C; Hoh, C; Moiseenko, V; Cervino, L; Gill, B

    2015-01-01

    Purpose: To assess the accuracy of internal target volume (ITV) segmentation of lung tumors for treatment planning of simultaneous integrated boost (SIB) radiotherapy as seen in 4D PET/CT images, using a novel 3D-printed phantom. Methods: The insert mimics high PET tracer uptake in the core and 50% uptake in the periphery, by using a porous design at the periphery. A lung phantom with the insert was placed on a programmable moving platform. Seven breathing waveforms of ideal and patient-specific respiratory motion patterns were fed to the platform, and 4D PET/CT scans were acquired of each of them. CT images were binned into 10 phases, and PET images were binned into 5 phases following the clinical protocol. Two scenarios were investigated for segmentation: a gate 30–70 window, and no gating. The radiation oncologist contoured the outer ITV of the porous insert with on CT images, while the internal void volume with 100% uptake was contoured on PET images for being indistinguishable from the outer volume in CT images. Segmented ITVs were compared to the expected volumes based on known target size and motion. Results: 3 ideal breathing patterns, 2 regular-breathing patient waveforms, and 2 irregular-breathing patient waveforms were used for this study. 18F-FDG was used as the PET tracer. The segmented ITVs from CT closely matched the expected motion for both no gating and gate 30–70 window, with disagreement of contoured ITV with respect to the expected volume not exceeding 13%. PET contours were seen to overestimate volumes in all the cases, up to more than 40%. Conclusion: 4DPET images of a novel 3D printed phantom designed to mimic different uptake values were obtained. 4DPET contours overestimated ITV volumes in all cases, while 4DCT contours matched expected ITV volume values. Investigation of the cause and effects of the discrepancies is undergoing

  4. Data assimilation and PWR primary measurement

    International Nuclear Information System (INIS)

    Mercier, Thibaud

    2015-01-01

    A Pressurized Water Reactor (PWR) Reactor Coolant System (RCS) is a highly complex physical process: heterogeneous power, flow and temperature distributions are difficult to be accurately measured, since instrumentations are limited in number, thus leading to the relevant safety and protection margins. EDF R and D is seeking to assess the potential benefits of applying Data Assimilation to a PWR's RCS (Reactor Coolant System) measurements, in order to improve the estimators for parameters of a reactor's operating setpoint, i.e. improving accuracy and reducing uncertainties and biases of measured RCS parameters. In this thesis, we define a 0D semi-empirical model for RCS, satisfying the description level usually chosen by plant operators, and construct a Monte-Carlo Method (inspired from Ensemble Methods) in order to use this model with Data Assimilation tools. We apply this method on simulated data in order to assess the reduction of uncertainties on key parameters: results are beyond expectations, however strong hypothesis are required, implying a careful preprocessing of input data. (author)

  5. Advanced high conversion PWR: preliminary analysis

    International Nuclear Information System (INIS)

    Golfier, H.; Bellanger, V.; Bergeron, A.; Dolci, F.; Gastaldi, B.; Koberl, O.; Mignot, G.; Thevenot, C.

    2007-01-01

    In this paper, physical aspects of a HCPWR (High Conversion Light Water Reactor), which is an innovative PWR fuelled with mixed oxide and having a higher conversion ratio due to a lower moderation ratio. Moderation ratios lower than unity are considered which has led to low moderation PWR fuel assembly designs. The objectives of this parametric study are to define a feasibility area with regard to the following neutronic aspects: moderation ratio, Pu loading, reactor spectrum, irradiation time, and neutronic coefficients. Important thermohydraulic parameters are the pressure drop, the critical heat flux, the maximum temperature in the fuel rod and the pumping power. The thermohydraulic analysis shows that a range of moderation ratios from 0.8 to 1.2 is technically possible. A compromise between improved fuel utilization and research and development effort has been found for the moderation ration of about 1. The parametric study shows that there are 2 ranges of interest for the moderation ratio: -) moderation ratio between 0.8 and 1.2 with reduced fissile heights (> 3 m), hexagonal arrangement fuel assembly and square arrangement fuel assembly are possible; and -) moderation between 0.6 and 0.7 with a modification of the reactor operating conditions (reduction of the primary flow and of the thermal power), the fuel rods could be arranged inside a hexagonal fuel rod assembly. (A.C.)

  6. CECP, Decommissioning Costs for PWR and BWR

    International Nuclear Information System (INIS)

    Bierschbach, M.C.

    1997-01-01

    1 - Description of program or function: The Cost Estimating Computer Program CECP, designed for use on an IBM personal computer or equivalent, was developed for estimating the cost of decommissioning boiling water reactor (BWR) and light-water reactor (PWR) power stations to the point of license termination. 2 - Method of solution: Cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial volume and costs; and manpower staffing costs. Using equipment and consumables costs and inventory data supplied by the user, CECP calculates unit cost factors and then combines these factors with transportation and burial cost algorithms to produce a complete report of decommissioning costs. In addition to costs, CECP also calculates person-hours, crew-hours, and exposure person-hours associated with decommissioning. 3 - Restrictions on the complexity of the problem: The program is designed for a specific waste charge structure. The waste cost data structure cannot handle intermediate waste handlers or changes in the charge rate structures. The decommissioning of a reactor can be divided into 5 periods. 200 different items for special equipment costs are possible. The maximum amount for each special equipment item is 99,999,999$. You can support data for 10 buildings, 100 components each; ESTS1071/01: There are 65 components for 28 systems available to specify the contaminated systems costs (BWR). ESTS1071/02: There are 75 components for 25 systems available to specify the contaminated systems costs (PWR)

  7. Modeling of PWR fuel at extended burnup

    International Nuclear Information System (INIS)

    Dias, Raphael Mejias

    2016-01-01

    This work studies the modifications implemented over successive versions in the empirical models of the computer program FRAPCON used to simulate the steady state irradiation performance of Pressurized Water Reactor (PWR) fuel rods under high burnup condition. In the study, the empirical models present in FRAPCON official documentation were analyzed. A literature study was conducted on the effects of high burnup in nuclear fuels and to improve the understanding of the models used by FRAPCON program in these conditions. A steady state fuel performance analysis was conducted for a typical PWR fuel rod using FRAPCON program versions 3.3, 3.4, and 3.5. The results presented by the different versions of the program were compared in order to verify the impact of model changes in the output parameters of the program. It was observed that the changes brought significant differences in the results of the fuel rod thermal and mechanical parameters, especially when they evolved from FRAPCON-3.3 version to FRAPCON-3.5 version. Lower temperatures, lower cladding stress and strain, lower cladding oxide layer thickness were obtained in the fuel rod analyzed with the FRAPCON-3.5 version. (author)

  8. Minor actinide transmutation on PWR burnable poison rods

    International Nuclear Information System (INIS)

    Hu, Wenchao; Liu, Bin; Ouyang, Xiaoping; Tu, Jing; Liu, Fang; Huang, Liming; Fu, Juan; Meng, Haiyan

    2015-01-01

    Highlights: • Key issues associated with MA transmutation are the appropriate loading pattern. • Commercial PWRs are the only choice to transmute MAs in large scale currently. • Considerable amount of MA can be loaded to PWR without disturbing k eff markedly. • Loading MA to PWR burnable poison rods for transmutation is an optimal loading pattern. - Abstract: Minor actinides are the primary contributors to long term radiotoxicity in spent fuel. The majority of commercial reactors in operation in the world are PWRs, so to study the minor actinide transmutation characteristics in the PWRs and ultimately realize the successful minor actinide transmutation in PWRs are crucial problem in the area of the nuclear waste disposal. The key issues associated with the minor actinide transmutation are the appropriate loading patterns when introducing minor actinides to the PWR core. We study two different minor actinide transmutation materials loading patterns on the PWR burnable poison rods, one is to coat a thin layer of minor actinide in the water gap between the zircaloy cladding and the stainless steel which is filled with water, another one is that minor actinides substitute for burnable poison directly within burnable poison rods. Simulation calculation indicates that the two loading patterns can load approximately equivalent to 5–6 PWR annual minor actinide yields without disturbing the PWR k eff markedly. The PWR k eff can return criticality again by slightly reducing the boric acid concentration in the coolant of PWR or removing some burnable poison rods without coating the minor actinide transmutation materials from PWR core. In other words, loading minor actinide transmutation material to PWR does not consume extra neutron, minor actinide just consumes the neutrons which absorbed by the removed control poisons. Both minor actinide loading patterns are technically feasible; most importantly do not need to modify the configuration of the PWR core and

  9. Fluid-structure interactions in PWR vessels during blowdown

    International Nuclear Information System (INIS)

    Schumann, U.; Enderle, G.; Katz, F.; Ludwig, A.; Moesinger, H.; Schlechtendahl, E.G.

    1979-01-01

    For analysis of blowdown loadings and dynamic response of PWR vessel internals several computer codes have been developed at Karlsruhe. The goal is to provide advanced codes which permit a 'best estimate' analysis of the deformations and stresses of the internal structures, in particular the core barrel, such that the safety margins can be evaluated. The stresses reach their maxima during the initial subcooled period of the blowdown in which two-phase phenomena are important in the blowdown pipe only. In this period, the computed results with and without fluid-structural interactions show that the coupling between the water in the downcomer and the rather thin elastic core barrel is of dominant importance. Without coupling the core barrel oscillates with much higher frequencies than with coupling. The amplitudes and stresses are about twice as large initially. Later, the decoupled analysis can result in a meaningless overestimation of the structural response. By comparison of computations for incompressible and for compressible fluid with and without coupling we have found that a correct treatment of the fluid-structure coupling is more important than the description of pressure waves. (orig.)

  10. Source terms associated with two severe accident sequences in a 900 MWe PWR

    International Nuclear Information System (INIS)

    Fermandjian, J.; Evrard, J.M.; Berthion, Y.; Lhiaubet, G.; Lucas, M.

    1983-12-01

    Hypothetical accidents taken into account in PWR risk assessment result in fission product release from the fuel, transfer through the primary circuit, transfer into the reactor containment building (RCB) and finally release to the environment. The objective of this paper is to define the characteristics of the source term (noble gases, particles and volatile iodine forms) released from the reactor containment building during two dominant core-melt accident sequences: S 2 CD and TLB according to the ''Reactor Safety Study'' terminology. The reactor chosen for this study is a French 900 MWe PWR unit. The reactor building is a prestressed concrete containment with an internal liner. The first core-melt accident sequence is a 2-break loss-of-coolant accident on the cold leg, with failure of both system and the containment spray system. The second one is a transient initiated by a loss of offsite and onsite power supply and auxiliary feedwater system. These two sequences have been chosen because they are representative of risk dominant scenarios. Source terms associated with hypothetical core-melt accidents S 2 CD and TLB in a French PWR -900 MWe- have been performed using French computer codes (in particular, JERICHO Code for containment response analysis and AEROSOLS/31 for aerosol behavior in the containment)

  11. PWR and WWER fuel performance. A comparison of major characteristics

    International Nuclear Information System (INIS)

    Weidinger, H.

    2006-01-01

    PWR and WWER fuel technologies have the same basic performance targets: most effective use of the energy stored in the fuel and highest possible reliability. Both fuel technologies use basically the same strategies to reach these targets: 1) Optimized reload strategies; 2) Maximal use of structural material with low neutron cross sections; 3) Decrease the fuel failure frequency towards a 'zero failure' performance by understanding and eliminating the root causes of those defects. The key driving force of the technology of both, PWR and WWER fuel is high burn-up. Presently a range of 45 - 50 MWD/kgU have been reached commercially for PWR and WWER fuel. The main technical limitations to reach high burn-up are typically different for PWR and WWER fuel: for PWR fuel it is the corrosion and hydrogen uptake of the Zr-based materials; for WWER fuel it is the mechanical and dimensional stability of the FA (and the whole core). Corrosion and hydrogen uptake of Zr-materials is a 'non-problem' for WWER fuel. Other performance criteria that are important for high burn-up are the creep and growth behaviour of the Zr materials and the fission gas release in the fuel rod. There exists a good and broad data base to model and design both fuel types. FA and fuel rod vibration appears to be a generic problem for both fuel types but with more evidence for PWR fuel performance reliability. Grid-to-rod fretting is still a major issue in the fuel failure statistics of PWR fuel. Fuel rod cladding defects by debris fretting is no longer a key problem for PWR fuel, while it still appears to be a significant root cause for WWER fuel failures. 'Zero defect' fuel performance is achievable with a high probability, as statistics for US PWR and WWER-1000 fuel has shown

  12. The simulation research for the dynamic performance of integrated PWR

    International Nuclear Information System (INIS)

    Yuan Jiandong; Xia Guoqing; Fu Mingyu

    2005-01-01

    The mathematical model of the reactor core of integrated PWR has been studied and simplified properly. With the lumped parameter method, authors have established the mathematical model of the reactor core, including the neutron dynamic equation, the feedback reactivities model and the thermo-hydraulic model of the reactor. Based on the above equations and models, the incremental transfer functions of the reactor core model have been built. By simulation experimentation, authors have compared the dynamic characteristics of the integrated PWR with the traditional dispersed PWR. The simulation results show that the mathematical models and equations are correct. (authors)

  13. A universal PWR spectral history correction

    International Nuclear Information System (INIS)

    Hutt, P.K.; Nunn, D.L.

    1989-01-01

    The accuracy of a form of universal correction for the difference between depletion conditions assumed in PWR assembly lattice calculations and those experienced in a reactor burn-up is investigated. The correction is based on lattice calculations in which only one such depletion history difference, depletion at two different water densities, is explicitly represented by lattice calculations. The assumption is made that other historical effects bear the same relationship to an appropriate time-average of the two-group neutron flux spectrum. The correction is shown to be accurate for the most important historical effects, depletion with burnable absorbers inserted, control rods inserted or at a different soluble boron level, in addition to density itself. The correction is less accurate for representing depletion at a different fuel or coolant temperature but even in these cases gives an improvement over no correction. In addition it is argued that these historic temperature effects are likely to be of minor importance. (author)

  14. Evaluation model for PWR irradiated fuel

    International Nuclear Information System (INIS)

    Gomes, I.C.

    1983-01-01

    The individual economic value of the plutonium isotopes for the recycle of the PWR reactor is investigated, assuming the existence of an market for this element. Two distinct market situations for the stages of the fuel cycle are analysed: one for the 1972 costs and the other for costs of 1982. Comparisons are made for each of the two market situations concerning enrichment of the U-235 in the uranium fuel that gives the minimum cost in the fuel cycle. The method adopted to establish the individual value of the plutonium isotopes consists on the economical analyses of the plutonium fuel cycle for four different isotopes mixtures refering to the uranium fuel cycle. (Author) [pt

  15. Chemical cleaning of nuclear (PWR) steam generators

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.; Mundis, J.A.

    1982-01-01

    This paper reports on a significant research program sponsored by a group of utilities (the Steam Generator Owners Group), which was undertaken to develop a process to chemically remove corrosion product deposits from the secondary side of pressurized water reactor (PWR) power plant steam generators. Results of this work have defined a process (solvent system and application methods) that is capable of removing sludge and tube-to-tube support plate crevice corrosion products generated during operation with all-volatile treatment (AVT) water chemistry. Considers a plant-specific test program that includes all materials in the steam generator to be cleaned and accounts for the physical locations (proximity and contact) of those materials. Points out that prior to applying the process in an operational unit, the utility, with the participation of the NSSR vendor, must define allowable total corrosion to the materials of construction of the unit

  16. Stochastic optimization of loading pattern for PWR

    International Nuclear Information System (INIS)

    Smuc, T.; Pevec, D.

    1994-01-01

    The application of stochastic optimization methods in solving in-core fuel management problems is restrained by the need for a large number of proposed solutions loading patterns, if a high quality final solution is wanted. Proposed loading patterns have to be evaluated by core neutronics simulator, which can impose unrealistic computer time requirements. A new loading pattern optimization code Monte Carlo Loading Pattern Search has been developed by coupling the simulated annealing optimization algorithm with a fast one-and-a-half dimensional core depletion simulator. The structure of the optimization method provides more efficient performance and allows the user to empty precious experience in the search process, thus reducing the search space size. Hereinafter, we discuss the characteristics of the method and illustrate them on the results obtained by solving the PWR reload problem. (authors). 7 refs., 1 tab., 1 fig

  17. Evaluation of tight-pitch PWR cores

    International Nuclear Information System (INIS)

    Correa, F.; Driscoll, M.J.; Lanning, D.D.

    1979-08-01

    The impact of tight pinch cores on the consumption of natural uranium ore has been evaluated for two systems of coupled PWR's namely one particular type of thorium system - 235 U/UO 2 : Pu/ThO 2 : 233 U/ThO 2 - and the conventional recycle-mode uranium system - 235 U/UO 2 : Pu/UO 2 . The basic parameter varied was the fuel-to-moderator volume ratio (F/M) of the (uniform) lattice for the last core in each sequence. Although methods and data verification in the range of present interest, 0.5 (current lattices) 1.0, the EPRI-LEOPARD and LASER programs used for the thorium and uranium calculations, respectively, were successfully benchmarked against several of the more pertinent experiments

  18. A pressure drop model for PWR grids

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Dong Seok; In, Wang Ki; Bang, Je Geon; Jung, Youn Ho; Chun, Tae Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1999-12-31

    A pressure drop model for the PWR grids with and without mixing device is proposed at single phase based on the fluid mechanistic approach. Total pressure loss is expressed in additive way for form and frictional losses. The general friction factor correlations and form drag coefficients available in the open literatures are used to the model. As the results, the model shows better predictions than the existing ones for the non-mixing grids, and reasonable agreements with the available experimental data for mixing grids. Therefore it is concluded that the proposed model for pressure drop can provide sufficiently good approximation for grid optimization and design calculation in advanced grid development. 7 refs., 3 figs., 3 tabs. (Author)

  19. Zebra: An advanced PWR lattice code

    International Nuclear Information System (INIS)

    Cao, L.; Wu, H.; Zheng, Y.

    2012-01-01

    This paper presents an overview of an advanced PWR lattice code ZEBRA developed at NECP laboratory in Xi'an Jiaotong Univ.. The multi-group cross-section library is generated from the ENDF/B-VII library by NJOY and the 361-group SHEM structure is employed. The resonance calculation module is developed based on sub-group method. The transport solver is Auto-MOC code, which is a self-developed code based on the Method of Characteristic and the customization of AutoCAD software. The whole code is well organized in a modular software structure. Some numerical results during the validation of the code demonstrate that this code has a good precision and a high efficiency. (authors)

  20. Simplified model of a PWR primary circuit

    International Nuclear Information System (INIS)

    Souza, A.L.; Faya, A.J.G.

    1988-07-01

    The computer program RENUR was developed to perform a very simplified simulation of a typical PWR primary circuit. The program has mathematical models for the thermal-hydraulics of the reactor core and the pressurizer, the rest of the circuit being treated as a single volume. Heat conduction in the fuel rod is analyzed by a nodal model. Average and hot channels are treated so that bulk response of the core and DNBR can be evaluated. A homogenenous model is employed in the pressurizer. Results are presented for a steady-state situation as well as for a loss of load transient. Agreement with the results of more elaborate computer codes is good with substantial reduction in computer costs. (author) [pt

  1. Full MOX high burn-up PWR

    Energy Technology Data Exchange (ETDEWEB)

    Okubo, Tsutomu; Kugo, Teruhiko; Shimada, Shoichiro; Araya, Fumimasa; Ochiai, Masaaki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1999-12-01

    As a part of conceptual investigation on advanced light water reactors for the future, a light water reactor with the high burn-up of 100 GWd/t, the long cycle operation of 3 years and the full MOX core is being studied, aiming at the improvement on economical aspects, the reduction of the spent fuel production, the utilization of Plutonium and so forth. The present report summarizes investigation on PWR-type reactors. The core with the increased moderation of the moderator-to-fuel volume ratio of 2.6 {approx} 3.0 has been proposed be such a core that accomplishes requirements mentioned above. Through the neutronic and the thermo-hydrodynamic evaluation, the performances of the core have been evaluated. Also, the safety designing is underway considering the reactor system with the passive safety features. (author)

  2. Zebra: An advanced PWR lattice code

    Energy Technology Data Exchange (ETDEWEB)

    Cao, L.; Wu, H.; Zheng, Y. [School of Nuclear Science and Technology, Xi' an Jiaotong Univ., No. 28, Xianning West Road, Xi' an, ShannXi, 710049 (China)

    2012-07-01

    This paper presents an overview of an advanced PWR lattice code ZEBRA developed at NECP laboratory in Xi'an Jiaotong Univ.. The multi-group cross-section library is generated from the ENDF/B-VII library by NJOY and the 361-group SHEM structure is employed. The resonance calculation module is developed based on sub-group method. The transport solver is Auto-MOC code, which is a self-developed code based on the Method of Characteristic and the customization of AutoCAD software. The whole code is well organized in a modular software structure. Some numerical results during the validation of the code demonstrate that this code has a good precision and a high efficiency. (authors)

  3. A pressure drop model for PWR grids

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Dong Seok; In, Wang Ki; Bang, Je Geon; Jung, Youn Ho; Chun, Tae Hyun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    A pressure drop model for the PWR grids with and without mixing device is proposed at single phase based on the fluid mechanistic approach. Total pressure loss is expressed in additive way for form and frictional losses. The general friction factor correlations and form drag coefficients available in the open literatures are used to the model. As the results, the model shows better predictions than the existing ones for the non-mixing grids, and reasonable agreements with the available experimental data for mixing grids. Therefore it is concluded that the proposed model for pressure drop can provide sufficiently good approximation for grid optimization and design calculation in advanced grid development. 7 refs., 3 figs., 3 tabs. (Author)

  4. Development of advanced PWR steam generator

    International Nuclear Information System (INIS)

    Saito, Itaru; Nakamura, Tomomichi

    1999-01-01

    In response to the increased power of the advanced PWR, it is necessary to develop a steam generator (SG) which has a large capacity with high performance and high reliability as well as being economical to produce. In this paper, the development of the design of a new SG for the advanced PWRs is described and compared with the design of a conventional SG. Moreover, an outline of a seismic verification test for the U-bend tube bundle which includes advanced anti-vibration bars (AVB) which are very important is described. As a result, it was verified that the bundle has sufficient strength and a relatively high attenuation to seismic loads. These results will be reflected in the detailed design of advanced AVBs. (author)

  5. Radiation embrittlement of PWR vessel supports

    International Nuclear Information System (INIS)

    Cheverton, R.D.; Robinson, G.C.; Pennell, W.E.; Nanstad, R.K.

    1989-01-01

    Several studies pertaining to radiation damage of PWR vessel supports were conducted between 1978 and 1987. During this period, apparently there was no reason to believe that low-temperature (<100 degree C) MTR embrittlement data were not appropriate for evaluating embrittlement of PWR vessel supports. However, late in 1986, data from the High Flux Isotope Reactor (HFIR) vessel surveillance program indicated that the embrittlement rates of the several HFIR vessel materials (A212-B, A350-LF3, A105-II) were substantially greater than anticipated on the basis of MTR data. Further evaluation of the HFIR data suggested that a fluence-rate effect was responsible for the apparent discrepancy, and shortly thereafter it became apparent that this rate effect was applicable to the evaluation of LWR vessel supports. As a result, the Nuclear Regulatory Commission (NRC) requested that the Oak Ridge National Laboratory (ORNL) evaluate the impact of the apparent embrittlement rate effect on the integrity of light-water-reactor (LWR) vessel supports. The purpose of the study was to provide an indication of whether the integrity of reactor vessel supports is likely to be challenged by radiation-induced embrittlement. The scope of the evaluation included correlation of the HFIR data for application to the evaluation of LWR vessel supports; a survey and cursory evaluation of all US LWR vessel support designs, selection of two plants for specific-plant evaluation, and a specific-plant evaluation of both plants to determine critical flaw sizes for their vessel supports. 19 refs., 8 figs., 2 tabs

  6. Changes in 900 MW PWR alarm processing policy

    Energy Technology Data Exchange (ETDEWEB)

    Pont, M [Electricite de France, Generation and Transmission, Nuclear Power Plant Operations, Paris (France)

    1997-09-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs.

  7. Changes in 900 MW PWR alarm processing policy

    International Nuclear Information System (INIS)

    Pont, M.

    1997-01-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs

  8. Deboration in nuclear stations of the PWR type

    International Nuclear Information System (INIS)

    1978-01-01

    Reactivity control in nuclear power stations of the PWR type is realised with boric acid. A method to concentrate boric acid without an evaporator has been studied. A flow-sheet with reverse osmosis is proposed. (author)

  9. Severe accident considerations for modern KWU-PWR plants

    International Nuclear Information System (INIS)

    Eyink, J.

    1987-01-01

    In assumption of severe accident on modern KWU-PWR plants the author discusses on the: selection of core meltdown sequences, course of the accident, containment behaviour and source terms for fission products release to the environment

  10. Dose rate evaluation after accident in a PWR

    International Nuclear Information System (INIS)

    Cladel, C.; Duchemin, B.; Le Dieu de Ville, A.; Nimal, B.; Nimal, J.C.; Evrard, J.M.

    1983-05-01

    A calculation scheme for the gamma radiation dose rate after accident in a PWR is presented. These studies use a fine description of the geometry and of the fission product inventory. Some results are given and some improvements are planned

  11. Ultrasonic inspection for testing the PWR fuel rod endplug welds

    International Nuclear Information System (INIS)

    Pillet, C.; Destribats, M.T.; Papezyk, F.

    1976-01-01

    A method of ultrasonic testing with local immersion and transversal waves was developed. It is possible to detect defects as the lacks of fusion and penetration and porosity in the PWR fuel rod endplug welds [fr

  12. Reactivity and neutron emission measurements of highly burnt PWR fuel rod samples

    International Nuclear Information System (INIS)

    Murphy, M.F.; Jatuff, F.; Grimm, P.; Seiler, R.; Brogli, R.; Meier, G.; Berger, H.-D.; Chawla, R.

    2006-01-01

    Fuel rods with burnup values beyond 50 GWd/t are characterised by relatively large amounts of fission products and a high abundance of major and minor actinides. Of particular interest is the change in the reactivity of the fuel as a function of burnup and the capability of modern codes to predict this change. In addition, the neutron emission from burnt fuel has important implications for the design of transport and storage facilities. Measurements have been made of the reactivity effects and the neutron emission rates of highly burnt uranium oxide and mixed oxide fuel rod samples coming from a pressurised water reactor (PWR). The reactivity measurements have been made in a PWR lattice in the PROTEUS zero-energy reactor moderated in turn with: water, a water and heavy water mixture and water containing boron. A combined transport flask and sample changer was used to insert the 400 mm long burnt fuel rod segments into the reactor. Both control rod compensation and reactor period methods were used to determine the reactivities of the samples. For the range of burnup values investigated, an interesting exponential relationship has been found between the neutron emission rate and the measured reactivity

  13. Model for transient simulation in a PWR steam circuit

    International Nuclear Information System (INIS)

    Mello, L.A. de.

    1982-11-01

    A computer code (SURF) was developed and used to simulate pressure losses along the tubes of the main steam circuit of a PWR nuclear power plant, and the steam flow through relief and safety valves when pressure reactors its thresholds values. A thermodynamic model of turbines (high and low pressure), and its associated components are simulated too. The SURF computer code was coupled to the GEVAP computer code, complementing the simulation of a PWR nuclear power plant main steam circuit. (Author) [pt

  14. GO evaluation of a PWR spray system. Final report

    International Nuclear Information System (INIS)

    Long, W.T.

    1975-08-01

    GO is a reliability analysis methodology developed over the years from 1960 to the present by Kaman Sciences Corporation, Colorado Springs, Colorado. In this report the GO methodology is presented and its application demonstrated by performing a reliability analysis of a conceptual PWR Containment Spray System. Certain numerical results obtained are compared with those of a prior fault tree analysis of the same system as documented in the 11 January 1973 draft report, A Fault Tree Evaluation of a PWR Spray System

  15. Thermal-hydraulic study of integrated steam generator in PWR

    International Nuclear Information System (INIS)

    Osakabe, Masahiro

    1989-01-01

    One of the safety aspects of innovative reactor concepts is the integration of steam generators (SGs) into the reactor vessel in the case of the pressurized water reactor (PWR). All of the reactor system components including the pressurizer are within the reactor vessel in the SG integrated PWR. The simple heat transfer code was developed for the parametric study of the integrated SG. The code was compared to the once-through 19-tube SG experiment and the good agreement between the experimental results and the code predictions was obtained. The assessed code was used for the parametric study of the integrated once-through 16 m-straight-tube SG installed in the annular downcomer. The proposed integrated SG as a first attempt has approximately the same tube size and pitch as the present PWR and the SG primary and secondary sides in the present PWR is inverted in the integrated PWR. Based on the study, the reactor vessel size of the SG integrated PWR was calculated. (author)

  16. Application of directional solidification ingot (LSD) in forging of PWR reactor vessel heads

    International Nuclear Information System (INIS)

    Benhamou, C.; Poitrault, I.

    1985-09-01

    Creusot-Loire Industrie uses this type of ingot for manufacture of Framatome 1300 and 1450 MW 4-loop PWR reactor vessel heads. This type of ingot offers a number advantages: improved internal soundness; greater chemical, structural and mechanical homogeneity of the finished part; simplified forging process. After a brief description of the pouring and solidification processes, this paper presents an analysis of the results of examinations performed on the prototype forging, as well as review of results obtained during industrial fabrication of dished heads from LSD ingots. The advantages of the LSD ingot over conventional ingots are discussed in conclusion

  17. A model finite-element to analyse the mechanical behavior of a PWR fuel rod

    International Nuclear Information System (INIS)

    Galeao, A.C.N.R.; Tanajura, C.A.S.

    1988-01-01

    A model to analyse the mechanical behavior of a PWR fuel rod is presented. We drew our attention to the phenomenon of pellet-pellet and pellet-cladding contact by taking advantage of an elastic model which include the effects of thermal gradients, cladding internal and external pressures, swelling and initial relocation. The problem of contact gives rise ro a variational formulation which employs Lagrangian multipliers. An iterative scheme is constructed and the finite element method is applied to obtain the numerical solution. Some results and comments are presented to examine the performance of the model. (author) [pt

  18. A study on the direct use of spent PWR fuel in CANDU reactors. DUPIC facility engineering

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyun Soo; Lee, Jae Sul; Choi, Jong Won [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-07-01

    This report summarizes the second year progress of phase II of DUPIC program which aims to verify experimentally the feasibility of direct use of spent PWR fuel in CANDU reactors. The project is to provide the experimental facilities and technologies that are required to perform the DUPIC experiment. As an early part of the project, engineering analysis of those facilities and construction of mock-up facility are described. Another scope of the project is to assess the DUPIC fuel cycle system and facilitate international cooperation. The progresses in this scope of work made during the fiscal year are also summarized in the report. 38 figs, 44 tabs, 8 refs. (Author).

  19. Maintenance and repair tools of the 900 MW PWR units in France

    International Nuclear Information System (INIS)

    Blary, F.; Castaing, C.; Hassig, J.

    1985-01-01

    EDF and FRAMATOME have developed special tools and, repair and maintenance procedures to decrease the unavailability of the PWR units and the dosimetry of the personnel of maintenance. This report presents the solution adopted to face the problem of replacement of the internal upper structure pins of 21 units: 1) study and realisation of important industrial means; 2) development of a strategy: the pin replacement is separated from the guide tube replacement by the creation of a pin replacement shop, and, as often as it is possible, the ''AQUARIUM'' method allows to replace the guide-tubes with the aid of a mobile pool called AQUARIUM outside the critical way of shutdown [fr

  20. Numerical simulation of thermohydraulic behavior of the steam generator of PWR type reactor

    International Nuclear Information System (INIS)

    Braga, C.V.M.; Carajilescov, P.

    1981-01-01

    Generally, 'U' tube steam generators with natural internal recirculation are used in PWR power stations. A thermalhydraulic model is developed for simulation of such components, in steady state. The flow of the secondary cycle fluid is divided in two parts individually homogeneous, allowing for heat and mass exchange between them. The secondary pressure is determined by defining the moisture of the vapor that feeds the turbine. This model is applied to the Angra II steam generator, operating in nominal conditions and with tubing partially plugged. (Author) [pt

  1. Cyclic elastic analysis of a PWR nozzle subjected to a repeated thermal shock

    International Nuclear Information System (INIS)

    Locci, J.M.; Prost, J.P.

    1979-01-01

    In the primary piping system of a PWR nuclear power plant, some nozzles are subjected to strong thermal shocks due to sudden thermal variations in the internal water flow. The thermal gradients are sufficiently high to induce general elastic plastic behaviour. The design of these nozzles using the simplified elastic plastic analysis given in the ASME III Code NB-3200 generally leads to a very high usage factor. The aim of this work is to show by giving an example that a complete cyclic elastic plastic analysis makes it possible to considerably reduce the usage factor. (orig.)

  2. Special points of view about development and construction of a PWR

    International Nuclear Information System (INIS)

    Meyer, P.J.

    1977-01-01

    1.0) The reactor core and its components, 1.1) design of the fuel assemblies, 1.2) incore instrumentation, 2.0) reactor pressure vessel with internals, 3.0) components of the reactor coolant loops, 3.1) steam generator, 3.2) pressurizer, 3.3) pressurizer relief tank, 3.4) reactor coolant pumps, 4.0) instrumentation and control of a PWR, 4.1) ex-core measuring system, 4.2) reactor protection system, 4.3) control systems, 4.4) radiation monitoring. (orig.) [de

  3. Stakes and Solutions for current and up-coming Licensing Challenges in PWR and BWR Reload and Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Curca-Tiving, F.; Opel, S.

    2014-07-01

    Regulatory requirements for reloads and safety analyses are evolving: New safety criteria, requests for enlarged qualification databases, statistical applications, uncertainty propagation... In order to address these challenges and access more predictable licensing processes, AREVA implements a consistent code and methodology suite for PWR and BWR core design and safety analysis, based on a first principles modeling with an extremely broad international verification and validation data base. (Author)

  4. Siemens Nuclear Power Corporation methods development for BWR/PWR reactor licensing

    International Nuclear Information System (INIS)

    Pruitt, D.W.

    1992-01-01

    This presentation addresses the Siemens Nuclear Power Corporation (SNP) perspective on the primary forces driving methods development in the nuclear industry. These forces are fuel design, computational environment and industry requirement evolution. The first segment of the discussion presents the SNP experience base. SNP develops, manufactures and licenses both BWR and PWR reload fuel. A review of this experience base highlights the accelerating rate at which new fuel designs are being introduced into the nuclear industry. The application of advanced BWR lattice geometries provides an example of fuel design trends. The second aspect of the presentation is the rapid evolution of the computing environment. The final subject in the presentation is the impact of industry requirements on code or methods development

  5. Multi-recycling of transuranic elements in a PWR assembly with reduced fuel rod diameter

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, Alex, E-mail: acchamb@gmail.com; Ragusa, Jean C., E-mail: jean.ragusa@tamu.edu

    2014-04-01

    Highlights: • Study of multiple recycling passes of transuranic elements: (a) without exceeding 5 wt.% on U-235 enrichment; (b) using PWR fuel assemblies compatible with current reactor core internals. • Isotopic concentrations tend towards an equilibrium after 15 recycle passes, suggesting that thermal recycling may be continued beyond that point. • Radiotoxicity comparisons for once-through UOX, once-recycle MOX-Pu, and multiple recycle passes of MOX-PuNpAm and MOX-PuNpAmCm are presented. - Abstract: This paper examines the multi-recycling of transuranic (TRU) elements (Pu-Np-Am-Cm) in standard Pressurized Water Reactor (PWR) assemblies. The original feed of TRU comes from legacy spent UOX fuel. For all subsequent recycling passes, TRU elements from the previous generation are employed, supplemented by TRU from legacy UOX fuel, as needed. The design criteria include: {sup 235}U enrichment requirements to remain below 5 w/o, TRU loading limits to avoid return to criticality under voided conditions, and assembly power peaking factors. In order to carry out multiple recycling passes within the design envelope, additional neutron moderation is required and achieved by reducing the fuel pellet diameter by about 13%, thus keeping the assembly design compatible with current PWR core internals. TRU transmutation rates and long-term ingestion radiotoxicity results are presented for 15 recycling passes and compared to standard UOX and MOX once-through cycles. The results also show that TRU fuel isotopics and radiotoxicity tend towards an equilibrium, enabling further additional recycling passes.

  6. Multi-recycling of transuranic elements in a PWR assembly with reduced fuel rod diameter

    International Nuclear Information System (INIS)

    Chambers, Alex; Ragusa, Jean C.

    2014-01-01

    Highlights: • Study of multiple recycling passes of transuranic elements: (a) without exceeding 5 wt.% on U-235 enrichment; (b) using PWR fuel assemblies compatible with current reactor core internals. • Isotopic concentrations tend towards an equilibrium after 15 recycle passes, suggesting that thermal recycling may be continued beyond that point. • Radiotoxicity comparisons for once-through UOX, once-recycle MOX-Pu, and multiple recycle passes of MOX-PuNpAm and MOX-PuNpAmCm are presented. - Abstract: This paper examines the multi-recycling of transuranic (TRU) elements (Pu-Np-Am-Cm) in standard Pressurized Water Reactor (PWR) assemblies. The original feed of TRU comes from legacy spent UOX fuel. For all subsequent recycling passes, TRU elements from the previous generation are employed, supplemented by TRU from legacy UOX fuel, as needed. The design criteria include: 235 U enrichment requirements to remain below 5 w/o, TRU loading limits to avoid return to criticality under voided conditions, and assembly power peaking factors. In order to carry out multiple recycling passes within the design envelope, additional neutron moderation is required and achieved by reducing the fuel pellet diameter by about 13%, thus keeping the assembly design compatible with current PWR core internals. TRU transmutation rates and long-term ingestion radiotoxicity results are presented for 15 recycling passes and compared to standard UOX and MOX once-through cycles. The results also show that TRU fuel isotopics and radiotoxicity tend towards an equilibrium, enabling further additional recycling passes

  7. A PWR Thorium Pin Cell Burnup Benchmark

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Kevan Dean; Zhao, X.; Pilat, E. E; Hejzlar, P.

    2000-05-01

    As part of work to evaluate the potential benefits of using thorium in LWR fuel, a thorium fueled benchmark comparison was made in this study between state-of-the-art codes, MOCUP (MCNP4B + ORIGEN2), and CASMO-4 for burnup calculations. The MOCUP runs were done individually at MIT and INEEL, using the same model but with some differences in techniques and cross section libraries. Eigenvalue and isotope concentrations were compared on a PWR pin cell model up to high burnup. The eigenvalue comparison as a function of burnup is good: the maximum difference is within 2% and the average absolute difference less than 1%. The isotope concentration comparisons are better than a set of MOX fuel benchmarks and comparable to a set of uranium fuel benchmarks reported in the literature. The actinide and fission product data sources used in the MOCUP burnup calculations for a typical thorium fuel are documented. Reasons for code vs code differences are analyzed and discussed.

  8. Aging effects in PWR power plants components

    Energy Technology Data Exchange (ETDEWEB)

    Borges, Diogo da S.; Guimaraes, Antonio C.F.; Moreira, Maria de Lourdes, E-mail: diogosb@outlook.com, E-mail: tony@ien.gov.br, E-mail: malu@ien.gov.br [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2013-07-01

    This paper presents a contribution to the study of aging process of components in commercial plants of Pressurized Water Reactors (PWRs). The analysis is made through application of the Fault Trees Method, Monte Carlo Method and Fussell-Vesely Importance Measure. The approach of the study of aging in nuclear power plants, besides giving attention to the economic factors involved directly with the extent of their operational life, also provide significant data on security issues. The latest case involving process of life extension of a PWR could be seen in Angra 1 Nuclear Power Plant through investing of $27 million for the installation of a new reactor lid. The corrective action has generated an estimated operating life extension of Angra I in twenty years, offering great economy compared with building cost of a new plant and anterior decommissioning, if it had reached the time operating limit of forty years. The Extension of the operating life of a nuclear power plant must be accompanied by a special attention to the components of the systems and their aging process. After the application of the methodology (aging analysis of the injection system of the containment spray) proposed in this work, it can be seen that 'the increase in the rate of component failure, due the aging process, generates the increase in the general unavailability of the system that containing these basic components'. The final results obtained were as expected and may contribute to the maintenance policy, preventing premature aging process in Nuclear Plant Systems. (author)

  9. Maintenance technologies for SCC of PWR

    International Nuclear Information System (INIS)

    Okimura, Koji; Hori, Nobuyuki; Kanzaki, Hiroshi; Tokuhisa, Kiichi; Kamo, Kazuhiko; Kurokawa, Masaaki

    2007-01-01

    The recent technologies of test, relaxation of deterioration, repairing and change of materials are explained for safe and stable operation of pressurized water reactor (PWR). Stress corrosion cracking (SCC) is originated by three factors such as materials, stress and environment. The eddy current test (ECT) method for the stream generator pipe and the ultrasonic test method for welding part of pipe were developed as the test technologies. Primary water stress corrosion cracking (PWSCC) of Inconel 600 in the welding part is explained. The shot peening of instrument in the gas, the water jet peening of it in water, and laser irradiation on the surface are illustrated as some examples of improvement technology of stress. The cladding of Inconel 690 on Inconel 600 is carried out under the condition of environmental cut. Total or some parts of the upper part of reactor, stream generator and structure in the reactor are changed by the improvement technologies. Changing Inconel 600 joint in the exit pipe of reactor with Inconel 690 is illustrated. (S.Y.)

  10. Alloy development for high burnup cladding (PWR)

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, R. [Kraftwerk Union AG, Mulheim (Germany); Jeong, Y.H.; Baek, K.H.; Kim, S.J.; Choi, B.K.; Kim, J.M. [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1999-04-01

    An overview on current alloy development for high burnup PWR fuel cladding is given. It is mainly based on literature data. First, the reasons for an increase of the current mean discharge burnup from 35 MWd / kg(U) to 70 MWd / kg(U) are outlined. From the material data, it is shown that a batch average burnup of 60-70 MWd / kg(U), as aimed by many fuel vendors, can not be achieved with stand (=ASTM-) Zry-4 cladding tubes without violating accepted design criteria. Specifically criteria which limit maximum oxide scale thickness and maximum hydrogen content, and to a less degree, maximum creep and growth rate, can not be achieved. The development potential of standard Zry-4 is shown. Even when taking advantage of this potential, it is shown that an 'improved' Zry-4 is reaching its limits when it achieves the target burnup. The behavior of some Zr alloys outside the ASTM range is shown, and the advantages and disadvantages of the 3 alloy groups (ZrSn+transition metals, ZrNb, ZrSnNb+transition metals) which are currently considered to have the development potential for high burnup cladding materials are depicted. Finally, conclusions are drawn. (author). 14 refs., 11 tabs., 82 figs.

  11. Conceptual study on advanced PWR system

    Energy Technology Data Exchange (ETDEWEB)

    Bae, Yoon Young; Chang, M H; Yu, K J; Lee, D J; Cho, B H; Kim, H Y; Yoon, J H; Lee, Y J; Kim, J P; Park, C T; Seo, J K; Kang, H S; Kim, J I; Kim, Y W; Kim, Y H

    1997-07-01

    In this study, the adoptable essential technologies and reference design concept of the advanced reactor were developed and related basic experiments were performed. (1) Once-through Helical Steam Generator: a performance analysis computer code for heli-coiled steam generator was developed for thermal sizing of steam generator and determination of thermal-hydraulic parameters. (2) Self-pressurizing pressurizer : a performance analysis computer code for cold pressurizer was developed. (3) Control rod drive mechanism for fine control : type and function were surveyed. (4) CHF in passive PWR condition : development of the prediction model bundle CHF by introducing the correction factor from the data base. (5) Passive cooling concepts for concrete containment systems: development of the PCCS heat transfer coefficient. (6) Steam injector concepts: analysis and experiment were conducted. (7) Fluidic diode concepts : analysis and experiment were conducted. (8) Wet thermal insulator : tests for thin steel layers and assessment of materials. (9) Passive residual heat removal system : a performance analysis computer code for PRHRS was developed and the conformance to EPRI requirement was checked. (author). 18 refs., 55 tabs., 137 figs.

  12. MELCOR/VISOR PWR desktop simulator

    International Nuclear Information System (INIS)

    With, Anka de; Wakker, Pieter

    2010-01-01

    Increasingly, there is a need for a learning support and training tool for nuclear engineers, utilities and students in order to broaden their understanding of advanced nuclear plant characteristics, dynamics, transients and safety features. Nuclear system analysis codes like ASTEC, RELAP5, RETRAN and MELCOR provide calculation results of and visualization tools can be used to graphically represent these results. However, for an efficient education and training a more interactive tool such as a simulator is needed. The simulator connects the graphical tool with the calculation tool in an interactive manner. A small number of desktop simulators exist [1-3]. The existing simulators are capable of representing different types of power plants and various accident conditions. However, they were found to be too general to be used as a reliable plant-specific accident analysis or training tool. A desktop simulator of the Pressurized Water Reactor (PWR) has been created under contract of the Dutch nuclear regulatory body (KFD). The desktop simulator is a software package that provides a close to real simulation of the Dutch nuclear power plant Borssele (KCB) and is used for training of the accident response. The simulator includes the majority of the power plant systems, necessary for the successful simulation of the KCB plant during normal operation, malfunctions and accident situations, and it has been successfully validated against the results of the safety evaluations from the KCB safety report. (orig.)

  13. Summary of PWR leak detection studies

    International Nuclear Information System (INIS)

    Cho, J.H.; Elia, F.A. Jr.

    1986-01-01

    Thermal-hydraulic analysis can be used to determine the location and magnitude of leaks inside and location of leaks outside a pressurized water reactor (PWR) containment as required by plant technical specifications. The major advantage of this detection method is that it minimizes radiation exposure of maintenance personnel because most of the leak detection process is performed from the control room outside containment. Plant-specific analyses are utilized to predict change in parameters such as local dew point temperature, relative humidity, dry bulb temperature, and flow rate to sump for various leak rates and enthalpies. These parameter responses are then programmed into the plant computer and instrumentation is provided for area monitoring. The actual inputs are continuously monitored and compared to the predicted plant responses to identify the leak location and quantify the leak. This study concludes that a system that monitors dew point (or relative humidity) and dry bulb temperature changes together with the flow rate to the sump will provide the capability to both locate and quantify a leak inside a containment, while a system that monitors dew point temperature (or relative humidity) changes will provide the capability to locate a leak outside a containment

  14. Hydrogen production in a PWR during LOCA

    International Nuclear Information System (INIS)

    Cassette, P.

    1984-01-01

    Hydrogen generation during a PWR LOCA has been estimated for design basis accident and for two more severe hypothetical accidents. Hydrogen production during design basis accident is a rather slow mechanism, allowing in the worst case, 15 days to connect a hydrogen recombining unit to the containment atmosphere monitoring system. Hydrogen generated by steam oxidation during more severe hypothetical accidents was found limited by steam availability and fuel melting phenomena. Uncertainty is, however, still remaining on corium-zirconium-steam interaction. In the worst case, calculations lead to the production of 500 kg of hydrogen, thus leading to a volume concentration of 15% in containment atmosphere, assuming homogeneous hydrogen distribution within the reactor building. This concentration is within flammability limits but not within detonation limits. However, hydrogen detonation due to local hydrogen accumulation cannot be discarded. A major uncertainty subsisting on hydrogen hazard is hydrogen distribution during the first hours of the accident. This point determines the effects and consequences of local detonation or deflagration which could possibly be harmful to safeguard systems, or induce missile generation in the reactor building. As electrical supply failures are identified as an important contributor to severe accident risk, corrective actions have been taken in France to improve their reliability, including the installation of a gas turbine on each site to supplement the existing sources. These actions are thus contributing to hydrogen hazard reduction

  15. Analysis of reactivity accidents in PWR'S

    International Nuclear Information System (INIS)

    Camous, F.; Chesnel, A.

    1989-12-01

    This note describes the French strategy which has consisted, firstly, in examining all the accidents presented in the PWR unit safety reports in order to determine for each parameter the impact on accident consequences of varying the parameter considered, secondly in analyzing the provisions taken into account to restrict variation of this parameter to within an acceptable range and thirdly, in checking that the reliability of these provisions is compatible with the potential consequences of transgression of the authorized limits. Taking into consideration violations of technical operating specifications and/or non-observance of operating procedures, equipment failures, and partial or total unavailability of safety systems, these studies have shown that fuel mechanical strength limits can be reached but that the probability of occurrence of the corresponding events places them in the residual risk field and that it must, in fact, be remembered that there is a wide margin between the design basis accidents and accidents resulting in fuel destruction. However, during the coming year, we still have to analyze scenarios dealing with cumulated events or incidents leading to a reactivity accident. This program will be mainly concerned with the impact of the cases examined relating to dilution incidents under normal operating conditions or accident operating conditions

  16. Conceptual study of advanced PWR core design

    International Nuclear Information System (INIS)

    Kim, Young Jin; Chang, Moon Hee; Kim, Keung Ku; Joo, Hyung Kuk; Kim, Young Il; Noh, Jae Man; Hwang, Dae Hyun; Kim, Taek Kyum; Yoo, Yon Jong.

    1997-09-01

    The purpose of this project is for developing and verifying the core design concepts with enhanced safety and economy, and associated methodologies for core analyses. From the study of the sate-of-art of foreign advanced reactor cores, we developed core concepts such as soluble boron free, high convertible and enhanced safety core loaded semi-tight lattice hexagonal fuel assemblies. To analyze this hexagonal core, we have developed and verified some neutronic and T/H analysis methodologies. HELIOS code was adopted as the assembly code and HEXFEM code was developed for hexagonal core analysis. Based on experimental data in hexagonal lattices and the COBRA-IV-I code, we developed a thermal-hydraulic analysis code for hexagonal lattices. Using the core analysis code systems developed in this project, we designed a 600 MWe core and studied the feasibility of the core concepts. Two additional scopes were performed in this project : study on the operational strategies of soluble boron free core and conceptual design of large scale passive core. By using the axial BP zoning concept and suitable design of control rods, this project showed that it was possible to design a soluble boron free core in 600 MWe PWR. The results of large scale core design showed that passive concepts and daily load follow operation could be practiced. (author). 15 refs., 52 tabs., 101 figs

  17. Conceptual study of advanced PWR core design

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Jin; Chang, Moon Hee; Kim, Keung Ku; Joo, Hyung Kuk; Kim, Young Il; Noh, Jae Man; Hwang, Dae Hyun; Kim, Taek Kyum; Yoo, Yon Jong

    1997-09-01

    The purpose of this project is for developing and verifying the core design concepts with enhanced safety and economy, and associated methodologies for core analyses. From the study of the sate-of-art of foreign advanced reactor cores, we developed core concepts such as soluble boron free, high convertible and enhanced safety core loaded semi-tight lattice hexagonal fuel assemblies. To analyze this hexagonal core, we have developed and verified some neutronic and T/H analysis methodologies. HELIOS code was adopted as the assembly code and HEXFEM code was developed for hexagonal core analysis. Based on experimental data in hexagonal lattices and the COBRA-IV-I code, we developed a thermal-hydraulic analysis code for hexagonal lattices. Using the core analysis code systems developed in this project, we designed a 600 MWe core and studied the feasibility of the core concepts. Two additional scopes were performed in this project : study on the operational strategies of soluble boron free core and conceptual design of large scale passive core. By using the axial BP zoning concept and suitable design of control rods, this project showed that it was possible to design a soluble boron free core in 600 MWe PWR. The results of large scale core design showed that passive concepts and daily load follow operation could be practiced. (author). 15 refs., 52 tabs., 101 figs.

  18. Multicriteria analysis of public protection in PWR's

    International Nuclear Information System (INIS)

    Lombard, J.

    1986-09-01

    In order to manage a risk efficiently and to reach the ALARA level of protection, the best possible protection options must be employed. As the available resources are limited, it is not always possible to choose those options that minimize the risk, therefore a compromise must be made between risks and safety expenses. When the choice is difficult or complex, finding such a compromise can be facilitated by resorting to a decision aiding method which allows the assessment of the respective advantages of the various protection options considered. The multicriteria methods employ successive comparisons. Instead of searching for a final indicator expressing the performance of each option they compare all option pairs in order to determine if the gap between their respective advantages and disadvantages is sufficient to estimate that one option of the each pair is better than the other. Instead of judging each option globally these methods evaluate the advantages and disadvantages associated with the eventual choice of an option as compared with the others. These differential and comparative approach gives more flexibility and allows the introduction of qualitative criteria. The method presented here (Electre 3), one of the most recent ones, allows a multicriteria comparison of a set of options keeping into account the uncertainties associated with the options or the preferences. In order to illustrate this method a simple example (4 options, 4 criteria) dealing with a PWR liquid releases treatment system, is taken up

  19. Modeling of PWR fuel at extended burnup

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Raphael M.; Silva, Antonio Teixeira, E-mail: rmdias@ipen.br, E-mail: teixeira@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    Since FRAPCON-3 series was rolled out, many improvements have been implanted in fuel performance codes, based on most recent literature, to promote better predictions against current data. Much of this advances include: improving fuel gas release prediction, hydrogen pickup model, cladding corrosion, and many others. An example of those modifications has been new cladding materials has added into hydrogen pickup model to support M5™, ZIRLO™, and ZIRLO™ optimized family under pressurized water reactor (PWR) conditions. Recently some research have been made over USNRC's steady-state fuel performance code, assessments against FUMEX-III's data have concluded that FRAPCON provides best-estimate calculation of fuel performance. Face of this, a study is required to summarize all those modifications and new implementations, as well as to compare this result against FRAPCON's older version, scrutinizing FRAPCON-3 series documentation to understand the real goal and literature base of any improvements. We have concluded that FRAPCON's latest modifications are based on strong literature review. Those modifications were tested against most recent data to assure these results will be the best evaluation as possible. Many improvements have been made to allow USNRC to have an audit tool with the last improvements. (author)

  20. Operation and maintenance in Genkai PWR Plant

    International Nuclear Information System (INIS)

    Ohta, Shojiro

    1984-01-01

    The No.1 PWR plant with 559 MW capacity in the Genkai Nuclear Power Station, Kyushu Electric Power Co., Inc., required about 115 days for the regular inspection in fiscal 1982 and thereafter, although more maintenance work was done. But No.2 plant of the same type required not more than 80 days. In most cases, the period of one operation cycle was from 10 to 12 months, but in the third operation cycle of No.2 plant, it is expected to be 13 months. The capacity ratio of the whole power station was 75.2% at the end of fiscal 1983. These operational records all exceeded the Japanese average. The plants are two-loop Westinghouse type PWRs, and No.1 plant started the commercial operation of anti h and the increment of P 0 + . (author) apacity ratio of No.1 plant was 71.6%, and that of No.2 plant was 85.5%. The intergranular attack on steam generator tubes was found first in the fifth regular inspection, and also in the sixth and seventh inspections, and the faulty tubes were plugged. The prevention of its spread is the largest problem. The in-service quality assurance activity, the personnel training program and the effort of upgrading the plant availability are reported. (Kako, I.)

  1. Method of starting up PWR type reactor

    International Nuclear Information System (INIS)

    Kadokami, Akira; Ueno, Ryuji; Tsuge, Ayao; Onimura, Kichiro; Ochi, Tatsuya.

    1988-01-01

    Purpose: To start-up a PWR type reactor so as to effectively impregnate and concentrate corrosion inhibitors in intergranular corrosive faces. Method: Upon reactor start-up, after transferring from the warm zero output state to thermal power loaded state and injecting corrosion inhibitors, thermal power is returned to zero and, subsequently, increased up to a rated power. By selecting the thermal power upon injecting the corrosion inhibitors to a steam generator body, that is, by selecting a thermal power load that starts to boil in heat conduction tubes, feedwater in the clavis portion can be formed into an appropriate boiling convection and, accordingly, the corrosion inhibitors can be penetrated to the clevis portion at a higher rate and in a greater amount as compared with those under zero power condition. Subsequently, when the thermal power is reduced, a sub-cooled state is attained in the clevis portion, in which steams present in the intergranular corrosion faces in the heat conduction tubes are condensated. As a result, the corrosion inhibitors at high concentration are impregnated into the intergranular corrosive faces to provide excellent effects. (Kamimura, M.)

  2. Conceptual study on advanced PWR system

    International Nuclear Information System (INIS)

    Bae, Yoon Young; Chang, M. H.; Yu, K. J.; Lee, D. J.; Cho, B. H.; Kim, H. Y.; Yoon, J. H.; Lee, Y. J.; Kim, J. P.; Park, C. T.; Seo, J. K.; Kang, H. S.; Kim, J. I.; Kim, Y. W.; Kim, Y. H.

    1997-07-01

    In this study, the adoptable essential technologies and reference design concept of the advanced reactor were developed and related basic experiments were performed. 1) Once-through Helical Steam Generator: a performance analysis computer code for heli-coiled steam generator was developed for thermal sizing of steam generator and determination of thermal-hydraulic parameters. 2) Self-pressurizing pressurizer : a performance analysis computer code for cold pressurizer was developed. 3) Control rod drive mechanism for fine control : type and function were surveyed. 4) CHF in passive PWR condition : development of the prediction model bundle CHF by introducing the correction factor from the data base. 5) Passive cooling concepts for concrete containment systems: development of the PCCS heat transfer coefficient. 6) Steam injector concepts: analysis and experiment were conducted. 7) Fluidic diode concepts : analysis and experiment were conducted. 8) Wet thermal insulator : tests for thin steel layers and assessment of materials. 9) Passive residual heat removal system : a performance analysis computer code for PRHRS was developed and the conformance to EPRI requirement was checked. (author). 18 refs., 55 tabs., 137 figs

  3. Computer aided information system for a PWR

    International Nuclear Information System (INIS)

    Vaidian, T.A.; Karmakar, G.; Rajagopal, R.; Shankar, V.; Patil, R.K.

    1994-01-01

    The computer aided information system (CAIS) is designed with a view to improve the performance of the operator. CAIS assists the plant operator in an advisory and support role, thereby reducing the workload level and potential human errors. The CAIS as explained here has been designed for a PWR type KLT- 40 used in Floating Nuclear Power Stations (FNPS). However the underlying philosophy evolved in designing the CAIS can be suitably adopted for other type of nuclear power plants too (BWR, PHWR). Operator information is divided into three broad categories: a) continuously available information b) automatically available information and c) on demand information. Two in number touch screens are provided on the main control panel. One is earmarked for continuously available information and the other is dedicated for automatically available information. Both the screens can be used at the operator's discretion for on-demand information. Automatically available information screen overrides the on-demand information screens. In addition to the above, CAIS has the features of event sequence recording, disturbance recording and information documentation. CAIS design ensures that the operator is not overburdened with excess and unnecessary information, but at the same time adequate and well formatted information is available. (author). 5 refs., 4 figs

  4. Economic optimization of PWR cores with ROSA

    International Nuclear Information System (INIS)

    Verhagen, F.C.M.; Wakker, P.H.

    2005-01-01

    The core-loading pattern is decisive for fuel cycle economics, fuel safety parameters and economic planning for future cycles. ROSA, NRG's loading pattern optimization code system for PWRs, has proven for over a decade to be a valuable tool to reactor operators for improving their fuel management economics. ROSA uses simulated annealing as loading pattern optimization technique, in combination with an extremely fast 3-D neutronics code for loading pattern calculations. The code is continuously extended with new optimization parameters and rules. This paper outlines recent developments of the ROSA code system and discusses results of PWR specific applications of ROSA. Core designs with a large variety of challenging constraints have been realized with ROSA. As a typical example, for the 193 assembly, Vantage 5H/RFA-2 fueled TVA's Watts Bar unit 1, a cycle 4 core with 76 feed assemblies was designed. This was followed by a high-energy cycle 5 with only 77 feed assemblies and approximately 535 days of natural cycle length. Subsequently, an economical core using 72 bundles was designed for cycle 6. This resulted in considerable savings in the cost of feed assemblies for reloads. The typical accuracy of ROSA compared to results of license codes in within ±0.02 for normalized assembly powers, ±0.03 for maximum enthalpy rise hot channel factor (F ΔH ), and ±3 days for natural cycle length. (author)

  5. Modeling of PWR fuel at extended burnup

    International Nuclear Information System (INIS)

    Dias, Raphael M.; Silva, Antonio Teixeira

    2015-01-01

    Since FRAPCON-3 series was rolled out, many improvements have been implanted in fuel performance codes, based on most recent literature, to promote better predictions against current data. Much of this advances include: improving fuel gas release prediction, hydrogen pickup model, cladding corrosion, and many others. An example of those modifications has been new cladding materials has added into hydrogen pickup model to support M5™, ZIRLO™, and ZIRLO™ optimized family under pressurized water reactor (PWR) conditions. Recently some research have been made over USNRC's steady-state fuel performance code, assessments against FUMEX-III's data have concluded that FRAPCON provides best-estimate calculation of fuel performance. Face of this, a study is required to summarize all those modifications and new implementations, as well as to compare this result against FRAPCON's older version, scrutinizing FRAPCON-3 series documentation to understand the real goal and literature base of any improvements. We have concluded that FRAPCON's latest modifications are based on strong literature review. Those modifications were tested against most recent data to assure these results will be the best evaluation as possible. Many improvements have been made to allow USNRC to have an audit tool with the last improvements. (author)

  6. ABB PWR fuel design for high burnup

    International Nuclear Information System (INIS)

    Nilsson, S.; Jourdain, P.; Limback, M.; Garde, A.M.

    1998-01-01

    Corrosion, hydriding and irradiation induced growth of a based materials are important factors for the high burnup performance of PWR fuel. ABB has developed a number of Zr based alloys to meet the need for fuel that enables operation to elevated burnups. The materials include composition and processing optimised Zircaloy 4 (OPTIN TM ) and Zircaloy 2 (Zircaloy 2P), as well as advanced Zr based alloys with chemical compositions outside the composition specified for Zircaloy. The advanced alloys are either used as Duplex or as single component claddings. The Duplex claddings have an inner component of Zircaloy and an outer layer of Zr with small additions of alloying elements. ABB has furthermore improved the dimensional stability of the fuel assembly by developing stiffer and more bow resistant guide tubes while debris related fuel failures have been eliminated from ABB fuel by introducing the Guardian TM grid. Intermediate flow mixers that improve the thermal hydraulic performance and the dimensional stability of the fuel has also been developed within ABB. (author)

  7. Seismic qualification of PWR plant auxiliary feedwater systems

    International Nuclear Information System (INIS)

    Lu, S.C.; Tsai, N.C.

    1983-08-01

    The NRC Standard Review Plan specifies that the auxiliary feedwater (AFW) system of a pressurized water reactor (PWR) is a safeguard system that functions in the event of a Safe Shutdown Earthquake (SSE) to remove the decay heat via the steam generator. Only recently licensed PWR plants have an AFW system designed to the current Standard Review Plan specifications. The NRC devised the Multiplant Action Plan C-14 in order to make a survey of the seismic capability of the AFW systems of operating PWR plants. The purpose of this survey is to enable the NRC to make decisions regarding the need of requiring the licensees to upgrade the AFW systems to an SSE level of seismic capability. To implement the first phase of the C-14 plan, the NRC issued a Generic Letter (GL) 81-14 to all operating PWR licensees requesting information on the seismic capability of their AFW systems. This report summarizes Lawrence Livermore National Laboratory's efforts to assist the NRC in evaluating the status of seismic qualification of the AFW systems in 40 PWR plants, by reviewing the licensees' responses to GL 81-14

  8. Development of Cost Estimation Methodology of Decommissioning for PWR

    International Nuclear Information System (INIS)

    Lee, Sang Il; Yoo, Yeon Jae; Lim, Yong Kyu; Chang, Hyeon Sik; Song, Geun Ho

    2013-01-01

    The permanent closure of nuclear power plant should be conducted with the strict laws and the profound planning including the cost and schedule estimation because the plant is very contaminated with the radioactivity. In Korea, there are two types of the nuclear power plant. One is the pressurized light water reactor (PWR) and the other is the pressurized heavy water reactor (PHWR) called as CANDU reactor. Also, the 50% of the operating nuclear power plant in Korea is the PWRs which were originally designed by CE (Combustion Engineering). There have been experiences about the decommissioning of Westinghouse type PWR, but are few experiences on that of CE type PWR. Therefore, the purpose of this paper is to develop the cost estimation methodology and evaluate technical level of decommissioning for the application to CE type PWR based on the system engineering technology. The aim of present study is to develop the cost estimation methodology of decommissioning for application to PWR. Through the study, the following conclusions are obtained: · Based on the system engineering, the decommissioning work can be classified as Set, Subset, Task, Subtask and Work cost units. · The Set and Task structure are grouped as 29 Sets and 15 Task s, respectively. · The final result shows the cost and project schedule for the project control and risk management. · The present results are preliminary and should be refined and improved based on the modeling and cost data reflecting available technology and current costs like labor and waste data

  9. Evolutionary developments of advanced PWR nuclear fuels and cladding materials

    International Nuclear Information System (INIS)

    Kim, Kyu-Tae

    2013-01-01

    Highlights: • PWR fuel and cladding materials development processes are provided. • Evolution of PWR advanced fuel in U.S.A. and in Korea is described. • Cutting-edge design features against grid-to-rod fretting and debris are explained. • High performance data of advanced grids, debris filters and claddings are given. -- Abstract: The evolutionary developments of advanced PWR fuels and cladding materials are explained with outstanding design features of nuclear fuel assembly components and zirconium-base cladding materials. The advanced PWR fuel and cladding materials development processes are also provided along with verification tests, which can be used as guidelines for newcomers planning to develop an advanced fuel for the first time. The up-to-date advanced fuels with the advanced cladding materials may provide a high level of economic utilization and reliable performance even under current and upcoming aggressive operating conditions. To be specific, nuclear fuel vendors may achieve high fuel burnup capability of between 45,000 and 65,000 MWD/MTU batch average, overpower thermal margin of as much as 15% and longer cycle length up to 24 months on the one hand and fuel failure rates of around 10 −6 on the other hand. However, there is still a need for better understanding of grid-to-rod fretting wear mechanisms leading to major PWR fuel defects in the world and subsequently a driving force for developing innovative spacer grid designs with zero fretting wear-induced fuel failure

  10. Towards a PSA harmonization French-Belgian comparison of the level 1 PSA for two similar PWR types

    International Nuclear Information System (INIS)

    Dupuy, P.; Corenwinder, F.; Lanore, J.M.; Gryffroy, D.; Gelder, P. de; Hulsmans, M.

    2002-06-01

    In the framework of the cooperation between French and Belgian regulatory authorities, a PSA (Probabilistic Safety Assessment) comparison exercise has been carried out for several years. This comparison deals with two PSA level 1 studies for internal events, performed for both power and shutdown states: the French PSA of the 900 MWe-series PWR, and the Belgian PSA of the Tihange 1 PWR, which both concern PWRs with a similar Framatome design. The purpose of this paper is to describe the PSA comparison methodology and to present, in a qualitative way, an overview of the insights obtained up to now. It also shows that such an 'a posteriori' benchmark exercise turns out to be a step towards PSA harmonization, and gives more confidence in the results of plant specific PSA when used for applications like precursor analysis or evaluations of importance to safety. (authors)

  11. Load-following operation of PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Jong Hwa; Oh, Soo Yul; Koo, Yang Hyun; Lee, Jae Han [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    The load-following operation of nuclear power plants will become inevitable due to the increased nuclear share in the total electricity generation. As a groundwork for the load-following capability of the Korean next generation PWRs, the state-of-the-art has been reviewed. The core control principles and methods are the main subject in this review as well as the impact of load-following operations on the fuel performance and on the mechanical integrity of components. To begin with, it was described what the load-following operation is and in what view point the technology should be reviewed. Afterwards the load-following method, performance and problems in domestic 900 MWe class PWRs were discussed, and domestic R and D works were summarized. Foreign technologies were also reviewed. They include Mode G and Mode X of Foratom, D and L bank method of KWU, the method using PSCEA of ABB-CE, and MSHIM of Westinghouse. The load-following related special features of Foratom`s N4 plant, KWU`s plants, ABB-CE`s Systems 80+, and Westinghouse`s AP600 were described in each technology review. The review concluded that the capability of N4 plant with Mode X is the best and the methods in System, 80+ and AP600 would require verifications for the continued and usual load-following operation. It was recommended that the load-following operation experiences in domestic PWRs under operation be required to settle down the capability for the future. In addition, a more enhanced technology is required for the Korean next generation PWR regardless what the reference plant concept is. 30 figs., 19 tabs., 75 refs. (Author).

  12. Activity incorporation into zinc doped PWR oxides

    International Nuclear Information System (INIS)

    Maekelae, Kari

    1998-01-01

    Activity incorporation into the oxide layers of PWR primary circuit constructional materials has been studied in Halden since 1993. The first zinc injection tests showed that zinc addition resulted in thinner oxide layers on new metal surfaces and reduced further incorporation of activity into already existing oxides. These tests were continued to find out the effects of previous zinc additions on the pickup of activity onto the surface oxides which were subsequently exposed to zinc-free coolant. The results showed that previous zinc addition will continue to reduce the rate of Co-60 build-up on out-of-core surfaces in subsequent exposure to zinc-free coolants. However, the previous Zn free test was performed for a relatively short period of time and the water chemistry programme was continued to find out the long term effects for extended periods without zinc. The activity incorporation into the stainless steel oxides started to increase as soon as zinc dosing to the coolant was stopped. The Co-60 concentration was lowest on all of the coupons which were first oxidised in Zn containing primary coolant. After the zinc injection period the thickness of the oxides increased, but activity in the oxide films did not increase at the same rate. This could indicate that zinc in the oxide blocks the adsorption sites for Co-60 incorporation. The Co-60 incorporation rate into the oxides on Inconel 600 seemed to be linear whether the oxide was pre-oxidised with or without Zn. The results indicate that zinc can either replace or prevent cobalt transport in the oxides. The results show that for zinc injection to be effective it should be carried out continuously. Furthermore the actual mechanism by which Zn inhibits the activity incorporation into the oxides is still not clear. Therefore, additional work has to follow with specified materials to verify the conclusions drawn in this work. (author)

  13. Segmented trapped vortex cavity

    Science.gov (United States)

    Grammel, Jr., Leonard Paul (Inventor); Pennekamp, David Lance (Inventor); Winslow, Jr., Ralph Henry (Inventor)

    2010-01-01

    An annular trapped vortex cavity assembly segment comprising includes a cavity forward wall, a cavity aft wall, and a cavity radially outer wall there between defining a cavity segment therein. A cavity opening extends between the forward and aft walls at a radially inner end of the assembly segment. Radially spaced apart pluralities of air injection first and second holes extend through the forward and aft walls respectively. The segment may include first and second expansion joint features at distal first and second ends respectively of the segment. The segment may include a forward subcomponent including the cavity forward wall attached to an aft subcomponent including the cavity aft wall. The forward and aft subcomponents include forward and aft portions of the cavity radially outer wall respectively. A ring of the segments may be circumferentially disposed about an axis to form an annular segmented vortex cavity assembly.

  14. Pavement management segment consolidation

    Science.gov (United States)

    1998-01-01

    Dividing roads into "homogeneous" segments has been a major problem for all areas of highway engineering. SDDOT uses Deighton Associates Limited software, dTIMS, to analyze life-cycle costs for various rehabilitation strategies on each segment of roa...

  15. Modeling on a PWR power conversion system with system program

    International Nuclear Information System (INIS)

    Gao Rui; Yang Yanhua; Lin Meng

    2007-01-01

    Based on the power conversion system of nuclear and conventional islands of Daya Bay Power Station, this paper models the thermal-hydraulic systems of primary and secondary loops for PWR by using the PWR best-estimate program-RELAP5. To simulate the full-scope power conversion system, not only the traditional basic system models of nuclear island, but also the major system models of conventional island are all considered and modeled. A comparison between the calculated results and the actual data of reactor demonstrates a fine match for Daya Bay Nuclear Power Station, and manifests the feasibility in simulating full-scope power conversion system of PWR by RELAP5 at the same time. (authors)

  16. Basic information about development and construction of a PWR

    International Nuclear Information System (INIS)

    Meyer, P.J.

    1977-01-01

    1.0) Plant layout of a PWR; 2.0) principle design of a PWR and the reactor coolant system; 3.0) reactor auxiliary and ancillary systems; 3.1) volume control system; 3.2) boric acid control and chemical feeding system; 3.3) coolant purification and degassing system; 3.4) coolant storage and treatment system; 3.5) nuclear component cooling system; 3.6) liquid waste processing system; 3.7) gaseous waste processing system; 4.0) residual heat removal system; 5.0) emergency feedwater system; 6.0) containment design; 7.0) fuel handling, storage and transport system in a PWR. (orig.) [de

  17. Improved emergency elevated air release for simplified PWR

    International Nuclear Information System (INIS)

    Naitoh, T.; Bruce, R.A.; Hirota, K.; Tajiri, Y.

    1992-01-01

    In developing the application of the simplified PWR in Japan, one of the most important areas is to limit post-accident site boundary whole body dose. In addressing this, the concept of Emergency Passive Air Filtration System (EPAFS) and it's feasibility is developed. The efficiency of charcoal filtering and the atmospheric diffusion effect of an elevated air release are important for dose reduction. The performance of these functions was evaluated by confirmatory testing. The test results confirmed a 99 percent efficiency of charcoal filter and an atmospheric diffusion effect higher than that of a conventional plant. The Emergency Passive Air Filtration System (EPAFS) and the atmospheric diffusion effect of elevated air release contribute to making the calculated post-accident site boundary whole body dose of simplified PWR as low as that of the conventional Japanese PWR plant. (author)

  18. Swing-Down of 21-PWR Waste Package

    International Nuclear Information System (INIS)

    A.K. Scheider

    2001-01-01

    The objective of this calculation is to determine the structural response of the waste package (WP) swinging down from a horizontally suspended height. The WP used for that purpose is the 21-Pressurized Water Reactor (PWR) WP. The scope of this document is limited to reporting the calculation results in terms of stress intensities. This calculation is associated with the WP design and was performed by the Waste Package Design group in accordance with the ''Technical Work Plan for: Waste Package Design Description for LA'' (Ref. 13). AP-3.12Q, ''Calculations'' (Ref. 18) is used to perform the calculation and develop the document. The information provided by the sketches attached to this calculation is that of the potential design of the type of 21-PWR WP design considered in this calculation and provides the potential dimensions and materials for the 21-PWR WP design

  19. Pressurizer and steam-generator behavior under PWR transient conditions

    International Nuclear Information System (INIS)

    Wahba, A.B.; Berta, V.T.; Pointner, W.

    1983-01-01

    Experiments have been conducted in the Loss-of-Fluid Test (LOFT) pressurized water reactor (PWR), at the Idaho National Engineering Laboratory, in which transient phenomena arising from accident events with and without reactor scram were studied. The main purpose of the LOFT facility is to provide data for the development of computer codes for PWR transient analyses. Significant thermal-hydraulic differences have been observed between the measured and calculated results for those transients in which the pressurizer and steam generator strongly influence the dominant transient phenomena. Pressurizer and steam generator phenomena that occurred during four specific PWR transients in the LOFT facility are discussed. Two transients were accompanied by pressurizer inflow and a reduction of the heat transfer in the steam generator to a very small value. The other two transients were accompanied by pressurizer outflow while the steam generator behavior was controlled

  20. Fabrication of PWR fuel assembly and CANDU fuel bundle

    International Nuclear Information System (INIS)

    Lee, G.S.; Suh, K.S.; Chang, H.I.; Chung, S.H.

    1980-01-01

    For the project of localization of nuclear fuel fabrication, the R and D to establish the fabrication technology of CANDU fuel bundle as well as PWR fuel assembly was carried out. The suitable boss height and the prober Beryllium coating thickness to get good brazing condition of appendage were studied in the fabrication process of CANDU fuel rod. Basic Studies on CANLUB coating method also were performed. Problems in each fabrication process step and process flow between steps were reviewed and modified. The welding conditions for top and bottom nozzles, guide tube, seal and thimble screw pin were established in the fabrication processes of PWR fuel assembly. Additionally, some researches for a part of PWR grid brazing problems are also carried out

  1. The advanced main control console for next japanese PWR plants

    International Nuclear Information System (INIS)

    Tsuchiya, A.; Ito, K.; Yokoyama, M.

    2001-01-01

    The purpose of the improvement of main control room designing in a nuclear power plant is to reduce operators' workload and potential human errors by offering a better working environment where operators can maximize their abilities. In order to satisfy such requirements, the design of main control board applied to Japanese Pressurized Water Reactor (PWR) type nuclear power plant has been continuously modified and improved. the Japanese Pressurized Water Reactor (PWR) Utilities (Electric Power Companies) and Mitsubishi Group have developed an advanced main control board (console) reflecting on the study of human factors, as well as using a state of the art electronics technology. In this report, we would like to introduce the configuration and features of the Advanced Main Control Console for the practical application to the next generation PWR type nuclear power plants including TOMARI No.3 Unit of Hokkaido Electric Power Co., Inc. (author)

  2. Cylindrization of a PWR core for neutronic calculations

    International Nuclear Information System (INIS)

    Santos, Rubens Souza dos

    2005-01-01

    In this work we propose a core cylindrization, starting from a PWR core configuration, through the use of an algorithm that becomes the process automated in the program, independent of the discretization. This approach overcomes the problem stemmed from the use of the neutron transport theory on the core boundary, in addition with the singularities associated with the presence of corners on the outer fuel element core of, existents in the light water reactors (LWR). The algorithm was implemented in a computational program used to identification of the control rod drop accident in a typical PWR core. The results showed that the algorithm presented consistent results comparing with an production code, for a problem with uniform properties. In our conclusions, we suggest, for future works, for analyzing the effect on mesh sizes for the Cylindrical geometry, and to compare the transport theory calculations versus diffusion theory, for the boundary conditions with corners, for typical PWR cores. (author)

  3. PWR fuel performance and future trend in Japan

    International Nuclear Information System (INIS)

    Kondo, Y.

    1987-01-01

    Since the first PWR power plant Mihama Unit 1 initiated its commercial operation in 1970, Japanese utilities and manufacturers have expended much of their resources and efforts to improve PWR technology. The results are already seen in significantly improved performance of 16 PWR plants now in operation. Mitsubishi Heavy Industries Ltd. (MHI) has been supplying them with nuclear fuel assemblies, which are over 5700. As the reliability of the current design fuel has been achieved, the direction of R and D on nuclear fuel has changed to make nuclear power more competitive to the other power generation methods. The most important R and D targets are the burnup extension, Gd contained fuel, Pu utilizatoin and the load follow capacility. (author)

  4. Radionuclide compositions of spent fuel and high level waste for the uranium and plutonium fuelled PWR

    International Nuclear Information System (INIS)

    Fairclough, M.P.; Tymons, B.J.

    1985-06-01

    The activities of a selection of radionuclides are presented for three types of reactor fuel of interest in radioactive waste management. The fuel types are for a uranium 'burning' PWR, a plutonium 'burning' PWR using plutonium recycled from spent uranium fuel and a plutonium 'burning' PWR using plutonium which has undergone multiple recycle. (author)

  5. Physics of plutonium and americium recycling in PWR using advanced fuel concepts

    International Nuclear Information System (INIS)

    Hourcade, E.

    2004-01-01

    PWR waste inventory management is considered in many countries including Frances as one of the main current issues. Pu and Am are the 2 main contents both in term of volume and long term radio-toxicity. Waiting for the Generation IV systems implementation (2035-2050), one of the mid-term solutions for their transmutation involves the use of advanced fuels in Pressurized Water Reactors (PWR). These have to require as little modification as possible of the core internals, the cooling system and fuel cycle facilities (fabrication and reprocessing). The first part of this paper deals with some neutronic characteristics of Pu and/or Am recycling. In a second part, 2 technical solutions MOX-HMR and APA-DUPLEX-84 are presented and the third part is devoted to the study of a few global strategies. The main neutronic parameters to be considered for Pu and Am recycling in PWR are void coefficient, Doppler coefficient, fraction of delayed neutrons and power distribution (especially for heterogeneous configurations). The modification of the moderation ratio, the opportunity to use inert matrices (targets), the optimisation of Uranium, Plutonium and Americium contents are the key parameters to play with. One of the solutions (APA-DUPLEX-84) presented here is a heterogeneous assembly with regular moderation ratio composed with both target fuel rods (Pu and Am embedded in an inert matrix) and standard UO 2 fuel rods. An EPR (European Pressurised Reactor) type reactor, loaded only with assemblies containing 84 peripheral targets, can reach an Americium consumption rate of (4.4; 23 kg/TWh) depending on the assembly concept. For Pu and Am inventories stabilisation, the theoretical fraction of reactors loaded with Pu + Am or Pu assemblies is about 60%. For Americium inventory stabilisation, the fraction decreases down to 16%, but Pu is produced at a rate of 18.5 Kg/TWh (-25% compared to one through UOX cycle)

  6. Intergranular stress corrosion cracking of ion irradiated 304L stainless steel in PWR environment

    International Nuclear Information System (INIS)

    Gupta, Jyoti

    2016-01-01

    IASCC is irradiation - assisted enhancement of intergranular stress corrosion cracking susceptibility of austenitic stainless steel. It is a complex degrading phenomenon which can have a significant influence on maintenance time and cost of PWRs' core internals and hence, is an issue of concern. Recent studies have proposed using ion irradiation (to be specific, proton irradiation) as an alternative of neutron irradiation to improve the current understanding of the mechanism. The objective of this study was to investigate the cracking susceptibility of irradiated SA 304L and factors contributing to cracking, using two different ion irradiations; iron and proton irradiations. Both resulted in generation of point defects in the microstructure and thereby causing hardening of the SA 304L. Material (unirradiated and iron irradiated) showed no susceptibility to intergranular cracking on subjection to SSRT with a strain rate of 5 * 10 -8 s -1 up to 4 % plastic strain in inert environment. But, irradiation (iron and proton) was found to increase intergranular cracking severity of material on subjection to SSRT in simulated PWR primary water environment at 340 C. Correlation between the cracking susceptibility and degree of localization was studied. Impact of iron irradiation on bulk oxidation of SA 304L was studied as well by conducting an oxidation test for 360 h in simulated PWR environment at 340 C. The findings of this study indicate that the intergranular cracking of 304L stainless steel in PWR environment can be studied using Fe irradiation despite its small penetration depth in material. Furthermore, it has been shown that the cracking was similar in both iron and proton irradiated samples despite different degrees of localization. Lastly, on establishing iron irradiation as a successful tool, it was used to study the impact of surface finish and strain paths on intergranular cracking susceptibility of the material. (author) [fr

  7. Speaker segmentation and clustering

    OpenAIRE

    Kotti, M; Moschou, V; Kotropoulos, C

    2008-01-01

    07.08.13 KB. Ok to add the accepted version to Spiral, Elsevier says ok whlile mandate not enforced. This survey focuses on two challenging speech processing topics, namely: speaker segmentation and speaker clustering. Speaker segmentation aims at finding speaker change points in an audio stream, whereas speaker clustering aims at grouping speech segments based on speaker characteristics. Model-based, metric-based, and hybrid speaker segmentation algorithms are reviewed. Concerning speaker...

  8. Spinal segmental dysgenesis

    Directory of Open Access Journals (Sweden)

    N Mahomed

    2009-06-01

    Full Text Available Spinal segmental dysgenesis is a rare congenital spinal abnormality , seen in neonates and infants in which a segment of the spine and spinal cord fails to develop normally . The condition is segmental with normal vertebrae above and below the malformation. This condition is commonly associated with various abnormalities that affect the heart, genitourinary, gastrointestinal tract and skeletal system. We report two cases of spinal segmental dysgenesis and the associated abnormalities.

  9. Implementation in free software of the PWR type university nucleo electric simulator (SU-PWR); Implementacion en software libre del simulador universitario de nucleoelectrica tipo PWR (SU-PWR)

    Energy Technology Data Exchange (ETDEWEB)

    Valle H, J.; Hidago H, F.; Morales S, J.B. [UNAM, Laboratorio de Analisis de Ingenieria de Reactores Nucleares DEPFI, Campus Morelos, en IMTA Jiutepec, Morelos (Mexico)]. e-mail: julfi_jg@yahoo.com.mx

    2007-07-01

    Presently work is shown like was carried out the implementation of the University Simulator of Nucleo-electric type PWR (SU-PWR). The implementation of the simulator was carried out in a free software simulation platform, as it is Scilab, what offers big advantages that go from the free use and without cost of the product, until the codes modification so much of the system like of the program with the purpose of to improve it or to adapt it to future routines and/or more advanced graphic interfaces. The SU-PWR shows the general behavior of a PWR nuclear plant (Pressurized Water Reactor) describing the dynamics of the plant from the generation process of thermal energy in the nuclear fuel, going by the process of energy transport toward the coolant of the primary circuit the one which in turn transfers this energy to the vapor generators of the secondary circuit where the vapor is expanded by means of turbines that in turn move the electric generator producing in this way the electricity. The pressurizer that is indispensable for the process is also modeled. Each one of these stages were implemented in scicos that is the Scilab tool specialized in the simulation. The simulation was carried out by means of modules that contain the differential equation that mathematically models each stage or equipment of the PWR plant. The result is a series of modules that based on certain entrances and characteristic of the system they generate exits that in turn are the entrance to other module. Because the SU-PWR is an experimental project in early phase, it is even work and modifications to carry out, for what the models that are presented in this work can vary a little the being integrated to the whole system to simulate, but however they already show clearly the operation and the conformation of the plant. (Author)

  10. Automatic Melody Segmentation

    NARCIS (Netherlands)

    Rodríguez López, Marcelo

    2016-01-01

    The work presented in this dissertation investigates music segmentation. In the field of Musicology, segmentation refers to a score analysis technique, whereby notated pieces or passages of these pieces are divided into “units” referred to as sections, periods, phrases, and so on. Segmentation

  11. The traveller: a new look for PWR fresh fuel packages

    International Nuclear Information System (INIS)

    Bayley, B.; Stilwell, W.E.; Kent, N.A.

    2004-01-01

    The Traveller PWR fresh fuel shipping package represents a radical departure from conventional PWR fuel package designs. This paper follows the development effort from the establishment of goals and objectives, to intermediate testing and analysis, to final testing and licensing. The discussion starts with concept origination and covers the myriad iterations that followed until arriving at a design that would meet the demanding licensing requirements, last for 30 years, and would be easy to load and unload fuel, easy to handle, inexpensive to manufacture and transport, and simple and inexpensive to maintain

  12. The study on radioactivity reduction of spent PWR cladding hull

    International Nuclear Information System (INIS)

    Jung, I. H.; Kim, J. H.; Park, C. J.; Jung, Y. H.; Song, K. C.; Lee, J. W.; Park, J. J.; Yang, M. S.

    2003-01-01

    Hull arising from the spent PWR fuel elements is classified as a high-level radioactive waste. This report describes the radio-chemical characteristics of the hull-from PWR spent fuel of 32,000MWd/tU burn-up and 15 years cooling, discharged from Gori Unit I cycled 4-7-by examination and literature survey. On the basis of the results, a method of degradation to middle and low-level radioactive waste was proposed by dry process such as laser or plasma technique with removing the nuclides deposited on the surface of the hull

  13. Monte Carlo based radial shield design of typical PWR reactor

    Energy Technology Data Exchange (ETDEWEB)

    Gul, Anas; Khan, Rustam; Qureshi, M. Ayub; Azeem, Muhammad Waqar; Raza, S.A. [Pakistan Institute of Engineering and Applied Sciences, Islamabad (Pakistan). Dept. of Nuclear Engineering; Stummer, Thomas [Technische Univ. Wien (Austria). Atominst.

    2016-11-15

    Neutron and gamma flux and dose equivalent rate distribution are analysed in radial and shields of a typical PWR type reactor based on the Monte Carlo radiation transport computer code MCNP5. The ENDF/B-VI continuous energy cross-section library has been employed for the criticality and shielding analysis. The computed results are in good agreement with the reference results (maximum difference is less than 56 %). It implies that MCNP5 a good tool for accurate prediction of neutron and gamma flux and dose rates in radial shield around the core of PWR type reactors.

  14. BEACON TSM application system to the operation of PWR reactors

    International Nuclear Information System (INIS)

    Lozano, J. A.; Mildrum, C.; Serrano, J. F.

    2012-01-01

    BEACON-TSM is an advanced core monitoring system for PWR reactor cores, and also offers the possibility to perform a wide range of predictive calculation in support of reactor operation. BEACON-TSM is presently installed and licensed in the 5 Spanish PWR reactors of standard Westinghouse design. the purpose of this paper is to describe the features of this software system and to show the advantages obtainable by a nuclear power plant from its use. To illustrate the capabilities and benefits of BEACON-TSM two real case reactor operating situations are presented. (Author)

  15. Steam Generator Owners Group PWR secondary water chemistry guidelines

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.; Green, S.J.

    1985-01-01

    In 1981 the Steam Generator Owners Group (SGOG), a group of domestic and foreign pressurized water reactor (PWR) owners, developed and issued the PWR secondary water chemistry guidelines. The guidelines were prepared in response to the growing recognition that a majority of the problems causing reduced steam generator reliability (e.g., denting, wasteage, pitting, etc.) were related to secondary (steam) side water purity. The guidelines were subsequently issued as an Electric Power Research Institute (EPRI) report. In 1984 they were revised to reflect industry experience in adopting the original issuance and to incorporate new information on causes of corrosion damage. The guidelines have been endorsed and their adoption recommended by the SGOG

  16. Sensitivity of risk parameters to human errors for a PWR

    International Nuclear Information System (INIS)

    Samanta, P.; Hall, R.E.; Kerr, W.

    1980-01-01

    Sensitivities of the risk parameters, emergency safety system unavailabilities, accident sequence probabilities, release category probabilities and core melt probability were investigated for changes in the human error rates within the general methodological framework of the Reactor Safety Study for a Pressurized Water Reactor (PWR). Impact of individual human errors were assessed both in terms of their structural importance to core melt and reliability importance on core melt probability. The Human Error Sensitivity Assessment of a PWR (HESAP) computer code was written for the purpose of this study

  17. Approximation for maximum pressure calculation in containment of PWR reactors

    International Nuclear Information System (INIS)

    Souza, A.L. de

    1989-01-01

    A correlation was developed to estimate the maximum pressure of dry containment of PWR following a Loss-of-Coolant Accident - LOCA. The expression proposed is a function of the total energy released to the containment by the primary circuit, of the free volume of the containment building and of the total surface are of the heat-conducting structures. The results show good agreement with those present in Final Safety Analysis Report - FSAR of several PWR's plants. The errors are in the order of ± 12%. (author) [pt

  18. Advanced ion exchange resins for PWR condensate polishing

    International Nuclear Information System (INIS)

    Hoffman, B.; Tsuzuki, S.

    2002-01-01

    The severe chemical and mechanical requirements of a pressurized water reactor (PWR) condensate polishing plant (CPP) present a major challenge to the design of ion exchange resins. This paper describes the development and initial operating experience of improved cation and anion exchange resins that were specifically designed to meet PWR CPP needs. Although this paper focuses specifically on the ion exchange resins and their role in plant performance, it is also recognized and acknowledged that excellent mechanical design and operation of the CPP system are equally essential to obtaining good results. (authors)

  19. PHEDRE model for the simulation of PWR reactors

    International Nuclear Information System (INIS)

    Bernard, Patrice; Dupraz, Remy; Vasile, Alfredo.

    1979-11-01

    This note presents the model of PHEDRE, simulator of a PWR, set on the hybrid computers of CISI, at the Nuclear Research Center of Cadarache. The model mainly concerns the primary part and the steam production of the PWR constructed in France. It includes an axial modelization of the core, the pressurizer, two loops of steam production and the inlet of the turbine, and the regulations concerning these components. The note presents the equations of the model, the structures of the codes concerning the initialization and the dynamic resolution, and describes the control panel of PHEDRE [fr

  20. Two optimal control methods for PWR core control

    International Nuclear Information System (INIS)

    Karppinen, J.; Blomsnes, B.; Versluis, R.M.

    1976-01-01

    The Multistage Mathematical Programming (MMP) and State Variable Feedback (SVF) methods for PWR core control are presented in this paper. The MMP method is primarily intended for optimization of the core behaviour with respect to xenon induced power distribution effects in load cycle operation. The SVF method is most suited for xenon oscillation damping in situations where the core load is unpredictable or expected to stay constant. Results from simulation studies in which the two methods have been applied for control of simple PWR core models are presented. (orig./RW) [de

  1. Leak before break application in French PWR plants under operation

    Energy Technology Data Exchange (ETDEWEB)

    Faidy, C. [EDF SEPTEN, Villeurbanne (France)

    1997-04-01

    Practical applications of the leak-before break concept are presently limited in French Pressurized Water Reactors (PWR) compared to Fast Breeder Reactors. Neithertheless, different fracture mechanic demonstrations have been done on different primary, auxiliary and secondary PWR piping systems based on similar requirements that the American NUREG 1061 specifications. The consequences of the success in different demonstrations are still in discussion to be included in the global safety assessment of the plants, such as the consequences on in-service inspections, leak detection systems, support optimization,.... A large research and development program, realized in different co-operative agreements, completes the general approach.

  2. Irradiation behavior of German PWR RPV steels under operating conditions

    Energy Technology Data Exchange (ETDEWEB)

    May, J.; Hein, H. [AREVA NP Gmbh (Germany); Ganswind, J. [VGB PowerTech e.V. (Germany); Widera, M. [RWE Power AG (Germany)

    2011-07-01

    In 2007, the last standard surveillance capsule of the original RPV (Reactor Pressure Vessel) surveillance programs of the 11 currently operating German PWR has been evaluated. With it the standard irradiation surveillance programs of these plants was completed. In the present paper, irradiation data of these surveillance programs will be presented and a final assessment of the irradiation behavior of the German PWR RPV steels with respect to current standards KTA 3203 and Reg. Guide 1.99 Rev. 2 will be given. Data from two units which are currently under decommissioning will also be included, so that data from all 13 German PWR manufactured by the former Siemens/KWU company (now AREVA NP GmbH) are shown. It will be shown that all surveillance data within the approved area of chemical composition verify the limit curve RT(limit) of the KTA 3203, which is the relevant safety standard for these plants. An analysis of the data shows, that the prediction formulas of Reg. Guide 1.99 Rev. 2 Pos. 1 or from the TTS model tend to overestimate the irradiation behavior of the German PWR RPV steels. Possible reasons for this behavior are discussed. Additionally, the data will be compared to data from the research project CARISMA to demonstrate that these data are representative for the irradiation behavior of the German PWR RPV steels. Since the data of these research projects cover a larger neutron fluence range than the original surveillance data, they offer a future outlook into the irradiation behavior of the German PWR RPV steels under long term conditions. In general, as a consequence of the relatively large and beneficial water gap between core and RPV, especially in all Siemens/KWU 4-loop PWR, the EOL neutron fluence and therefore the irradiation induced changes in mechanical properties of the German PWR RPV materials are rather low. Moreover the irradiation data indicate that the optimized RPV materials specifications that have been applied in particular for the

  3. Transient performance of flow in circuits of PWR type reactors

    International Nuclear Information System (INIS)

    Hirdes, V.R.; Carajilescov, P.

    1988-09-01

    Generally, PWR's are designed with several primary loops, each one provided with a pump to circulate the coolant through the core. If one or more of these pumps fail, there would be a decrease in reactor flow rate which could cause coolant phase change in the core and components overheating. The present work establishes a simulation model for pump failure in PWR's and the SARDAN-FLOW computes code was developed, considering any combination of such failures. Based on the data of Angra I, several accident and operational transient conditions were simulated. (author) [pt

  4. Transient performance of flow in PWR reactor circuits

    International Nuclear Information System (INIS)

    Hirdes, V.R.T.R.; Carajilescov, P.

    1988-12-01

    Generally, PWR's are designed with several primary loops, each one provided with a pump to circulate the coolant through the core. If one or more of these pumps fail, there would be a decrease in reactor flow rate which cause coolant phase change in the core and components overheating. The present work establishes a simulation model for pump failure in PWR's and the SARDAN-FLOW computes code was developed, considering any combination of such failures. Based on the data of Angra I, several accident and operational transient conditions were simulated. (author) [pt

  5. (A new application in segment reporting: IFRS 8)

    OpenAIRE

    Arsoy, Aylin Poroy

    2008-01-01

    IFRS 8 Operating Segments issued by the International Accounting Standards Board (IASB) on December 30th, 2006, changes the requirements of segment reporting. IAS 14 will cease to be effective when IFRS 8 will become effective from the beginning of 2009. After then, companies will be required to follow IFRS 8 for their segment reporting purposes. The main difference between IFRS 8 and IAS 14 is the approach that is adopted while determining the reportable segments. Also, it should be mentione...

  6. Aging Management Strategy and Requirements of Pressurized Water Reactor Internal Components

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Jun Seog; Oh, Sung Jin; Won, Se Yol; Jeong, Sun Mi [KHNP, Daejeon (Korea, Republic of)

    2016-05-15

    The demonstration that the effects of degradation in the components of PWR internals are adequately managed is essential for maintaining a healthy fleet and ensuring the continued functionality of the reactor internals. It is also very important to determine when and where irradiation susceptibility may occur for the continued operation. This paper introduces the aging management strategies and requirements for PWR internals components and discusses effects of irradiation aging results from the functionality assessments based on the categorization of internal components. This paper introduces aging management strategies and requirements for PWR internals components. The aging management requirements for PWR internals are specified in four final component groups, which are Primary, Expansion, Existing Program and No Additional Measures. Among these groups, Primary groups include any restriction on general applicability, degradation mechanism, forward link to any Expansion components, examination method, initial examination and frequency, and examination coverage and accessibility. Expansion groups are backward link to the Primary component.

  7. PENENTUAN KOEFISIEN DISPERSI ATMOSFERIK UNTUK ANALISIS KECELAKAAN REAKTOR PWR DI INDONESIA

    Directory of Open Access Journals (Sweden)

    Pande Made Udiyani

    2015-03-01

    Full Text Available Atmosfer merupakan pathway penting pada perpindahan radionuklida yang lepas dari Pembangkit Listrik Tenaga Nuklir (PLTN ke lingkungan dan manusia. Penerimaan dosis pada lingkungan dan manusia dipengaruhi oleh sourceterm dan kondisi tapak PLTN. Untuk mengetahui penerimaan dosis lingkungan untuk PLTN di Indonesia, maka diperlukan nilai koefisien dispersi untuk tapak potensial yang dipilih. Model perhitungan dalam penelitian ini menggunakan model yang diterapkan pada paket program pada modul ATMOS dan CONCERN dari PC-Cosyma yaitu model perhitungan segmented plume model. Perhitungan dilakukan untuk PLTN tipe PWR kapasitas 1000 MWe berbahan bakar UO2, postulasi kejadian untuk kecelakaan DBA, kondisi tapak kasar, untuk 6 tapak contoh tapak Semenanjung Muria, Pesisir Banten, dan tapak yang didominasi oleh stabilitas cuaca C,D,E, dan F. Koefisien dispersi dihitung untuk 8 kelompok nuklida produk fisi yang lepas dari PLTN yaitu: kelompok gas mulia, lantanida, logam mulia, halogen, logam alkali, tellurium, cerium, dan kelompok stronsium & barium. Perhitungan input menggunakan paket program ORIGEN-2 dan Arc View untuk penyiapan input perhitungan. Hasil pemetaan untuk parameter dispersi maksimum rerata diperoleh pada jarak radius 800 m dari sumber lepasan untuk nuklida dari kelompok logam mulia, logam alkali dan kelompok nuklida cerium. Parameter dispersi untuk Tapak Muria maksimum 1,53E-04 s/m3, Tapak Serang adalah 1,40E-03 s/m3, tapak dengan stabilitas C: 1,72E-04 s/m3, stabilitas D: 1,40E-04 s/m3, Stabilitas E: 1,07E-04 s/m3, dan tapak dengan stabilitas F : 2,14E-05 s/m3. Kata kunci: koefisien dispersi, atmosferik, PWR, kecelakaan, Indonesia   The atmosphere is an important pathway in the migration of radionuclides transport from the Nuclear Power Plant (NPP to the environment and humans. The dose accepted in the environment and humans is influenced by the sourceterm and NPP siting condition. Distribution of radionuclides in the atmosphere is determined

  8. Methodology for the LABIHS PWR simulator modernization

    Energy Technology Data Exchange (ETDEWEB)

    Jaime, Guilherme D.G.; Oliveira, Mauro V., E-mail: gdjaime@ien.gov.b, E-mail: mvitor@ien.gov.b [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2011-07-01

    The Human-System Interface Laboratory (LABIHS) simulator is composed by a set of advanced hardware and software components whose goal is to simulate the main characteristics of a Pressured Water Reactor (PWR). This simulator serves for a set of purposes, such as: control room modernization projects; designing of operator aiding systems; providing technological expertise for graphical user interfaces (GUIs) designing; control rooms and interfaces evaluations considering both ergonomics and human factors aspects; interaction analysis between operators and the various systems operated by them; and human reliability analysis in scenarios considering simulated accidents and normal operation. The simulator runs in a PA-RISC architecture server (HPC3700), developed nearby 2000's, using the HP-UX operating system. All mathematical modeling components were written using the HP Fortran-77 programming language with a shared memory to exchange data from/to all simulator modules. Although this hardware/software framework has been discontinued in 2008, with costumer support ceasing in 2013, it is still used to run and operate the simulator. Due to the fact that the simulator is based on an obsolete and proprietary appliance, the laboratory is subject to efficiency and availability issues, such as: downtime caused by hardware failures; inability to run experiments on modern and well known architectures; and lack of choice of running multiple simulation instances simultaneously. This way, there is a need for a proposal and implementation of solutions so that: the simulator can be ported to the Linux operating system, running on the x86 instruction set architecture (i.e. personal computers); we can simultaneously run multiple instances of the simulator; and the operator terminals run remotely. This paper deals with the design stage of the simulator modernization, in which it is performed a thorough inspection of the hardware and software currently in operation. Our goal is to

  9. Methodology for the LABIHS PWR simulator modernization

    Energy Technology Data Exchange (ETDEWEB)

    Jaime, Guilherme D.G.; Oliveira, Mauro V., E-mail: gdjaime@ien.gov.b, E-mail: mvitor@ien.gov.b [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2011-07-01

    The Human-System Interface Laboratory (LABIHS) simulator is composed by a set of advanced hardware and software components whose goal is to simulate the main characteristics of a Pressured Water Reactor (PWR). This simulator serves for a set of purposes, such as: control room modernization projects; designing of operator aiding systems; providing technological expertise for graphical user interfaces (GUIs) designing; control rooms and interfaces evaluations considering both ergonomics and human factors aspects; interaction analysis between operators and the various systems operated by them; and human reliability analysis in scenarios considering simulated accidents and normal operation. The simulator runs in a PA-RISC architecture server (HPC3700), developed nearby 2000's, using the HP-UX operating system. All mathematical modeling components were written using the HP Fortran-77 programming language with a shared memory to exchange data from/to all simulator modules. Although this hardware/software framework has been discontinued in 2008, with costumer support ceasing in 2013, it is still used to run and operate the simulator. Due to the fact that the simulator is based on an obsolete and proprietary appliance, the laboratory is subject to efficiency and availability issues, such as: downtime caused by hardware failures; inability to run experiments on modern and well known architectures; and lack of choice of running multiple simulation instances simultaneously. This way, there is a need for a proposal and implementation of solutions so that: the simulator can be ported to the Linux operating system, running on the x86 instruction set architecture (i.e. personal computers); we can simultaneously run multiple instances of the simulator; and the operator terminals run remotely. This paper deals with the design stage of the simulator modernization, in which it is performed a thorough inspection of the hardware and software currently in operation. Our goal is to

  10. An integrated PWR for marine propulsion

    International Nuclear Information System (INIS)

    Letouze, A.; Marecaux, A.; Rollason, J.; Heap, S.; Foster, A.; Jewer, S.; Thompson, A. C.; Williams, A. M.; Beeley, P. A.

    2008-01-01

    Results from a design study for a nuclear propulsion plant utilising a small integrated PWR using many of the inherent safety features of the IRIS design. The design consists of a single pass, low enrichment core housed, together with all associated primary circuit components, within a reactor pressure vessel 10.3 m high and 4.1 m in diameter. Reactor physics calculations were conducted with the codes WIMS9a and MONK8b. The core design contains 21 fuel assemblies each containing 264 UO 2 fuel pins. Each fuel module has a cluster of 24 boron carbide control rods and a central instrumentation channel. The fuel enrichment was 9% in order to achieve the core lifetime requirement of 3000 EFPD at a reactor power of 120 MWth. This gives a discharge burnup of 51,000 MWd/t. To control excess reactivity, two forms of burnable poison are employed: a zirconium dibromide (ZrB 2 ) coating on the fuel compacts, and gadolinium oxide homogeneously mixed in the fuel. Thermal hydraulic calculations were performed using TRAC-P(ND) for steady-state operation and for a number of fault transients. The helical once through steam generators were modelled using heat structure and pipe components and their performance compared to independent calculations including heat transfer correlations for the helical coiled geometry. Intact circuit calculations for steady state were followed by a small break LOCA calculation including the effect of a containment volume which reproduced the gain of coolant effect reported for IRIS. It was demonstrated that the thermal limits were not exceeded for the identified key transients. The dynamic response of the reactor plant to typical power demands was modelled using AcslXtreme software. Several schemes for limiting the power overshoot that was found on rapid increase to full power were examined. It was concluded that the SG must be operated with variable secondary pressure and the best means of reducing power overshoot is to step back the throttle opening

  11. Methodology for the LABIHS PWR simulator modernization

    International Nuclear Information System (INIS)

    Jaime, Guilherme D.G.; Oliveira, Mauro V.

    2011-01-01

    The Human-System Interface Laboratory (LABIHS) simulator is composed by a set of advanced hardware and software components whose goal is to simulate the main characteristics of a Pressured Water Reactor (PWR). This simulator serves for a set of purposes, such as: control room modernization projects; designing of operator aiding systems; providing technological expertise for graphical user interfaces (GUIs) designing; control rooms and interfaces evaluations considering both ergonomics and human factors aspects; interaction analysis between operators and the various systems operated by them; and human reliability analysis in scenarios considering simulated accidents and normal operation. The simulator runs in a PA-RISC architecture server (HPC3700), developed nearby 2000's, using the HP-UX operating system. All mathematical modeling components were written using the HP Fortran-77 programming language with a shared memory to exchange data from/to all simulator modules. Although this hardware/software framework has been discontinued in 2008, with costumer support ceasing in 2013, it is still used to run and operate the simulator. Due to the fact that the simulator is based on an obsolete and proprietary appliance, the laboratory is subject to efficiency and availability issues, such as: downtime caused by hardware failures; inability to run experiments on modern and well known architectures; and lack of choice of running multiple simulation instances simultaneously. This way, there is a need for a proposal and implementation of solutions so that: the simulator can be ported to the Linux operating system, running on the x86 instruction set architecture (i.e. personal computers); we can simultaneously run multiple instances of the simulator; and the operator terminals run remotely. This paper deals with the design stage of the simulator modernization, in which it is performed a thorough inspection of the hardware and software currently in operation. Our goal is to

  12. Association between proximal internal carotid artery steno-occlusive disease and diffuse wall thickening in its petrous segment: a magnetic resonance vessel wall imaging study

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Xiaoyi; Li, Dongye [Capital Medical University and Beijing Institute for Brain Disorders, Center for Brain Disorders Research, Beijing (China); Tsinghua University School of Medicine, Center for Biomedical Imaging Research, Department of Biomedical Engineering, Beijing (China); Zhao, Huilin [Shanghai Jiao Tong University, Department of Radiology, Renji Hospital, School of Medicine, Shanghai (China); Chen, Zhensen; Qiao, Huiyu; He, Le; Li, Rui [Tsinghua University School of Medicine, Center for Biomedical Imaging Research, Department of Biomedical Engineering, Beijing (China); Cui, Yuanyuan [PLA General Hospital, Department of Radiology, Beijing (China); Zhou, Zechen [Philips Research China, Healthcare Department, Beijing (China); Yuan, Chun [Tsinghua University School of Medicine, Center for Biomedical Imaging Research, Department of Biomedical Engineering, Beijing (China); University of Washington, Department of Radiology, Seattle, WA (United States); Zhao, Xihai [Tsinghua University School of Medicine, Center for Biomedical Imaging Research, Department of Biomedical Engineering, Beijing (China); Beijing Institute for Brain Disorders, Center for Stroke, Beijing (China)

    2017-05-15

    Significant stenosis or occlusion in carotid arteries may lead to diffuse wall thickening (DWT) in the arterial wall of downstream. This study aimed to investigate the correlation between proximal internal carotid artery (ICA) steno-occlusive disease and DWT in ipsilateral petrous ICA. Symptomatic patients with atherosclerotic stenosis (>0%) in proximal ICA were recruited and underwent carotid MR vessel wall imaging. The 3D motion sensitized-driven equilibrium prepared rapid gradient-echo (3D-MERGE) was acquired for characterizing the wall thickness and longitudinal extent of the lesions in petrous ICA and the distance from proximal lesion to the petrous ICA. The stenosis degree in proximal ICA was measured on the time-of-flight (TOF) images. In total, 166 carotid arteries from 125 patients (mean age 61.0 ± 10.5 years, 99 males) were eligible for final analysis and 64 showed DWT in petrous ICAs. The prevalence of severe DWT in petrous ICA was 1.4%, 5.3%, 5.9%, and 80.4% in ipsilateral proximal ICAs with stenosis category of 1%-49%, 50%-69%, 70%-99%, and total occlusion, respectively. Proximal ICA stenosis was significantly correlated with the wall thickness in petrous ICA (r = 0.767, P < 0.001). Logistic regression analysis showed that proximal ICA stenosis was independently associated with DWT in ipsilateral petrous ICA (odds ratio (OR) = 2.459, 95% confidence interval (CI) 1.896-3.189, P < 0.001). Proximal ICA steno-occlusive disease is independently associated with DWT in ipsilateral petrous ICA. (orig.)

  13. Association between proximal internal carotid artery steno-occlusive disease and diffuse wall thickening in its petrous segment: a magnetic resonance vessel wall imaging study

    International Nuclear Information System (INIS)

    Chen, Xiaoyi; Li, Dongye; Zhao, Huilin; Chen, Zhensen; Qiao, Huiyu; He, Le; Li, Rui; Cui, Yuanyuan; Zhou, Zechen; Yuan, Chun; Zhao, Xihai

    2017-01-01

    Significant stenosis or occlusion in carotid arteries may lead to diffuse wall thickening (DWT) in the arterial wall of downstream. This study aimed to investigate the correlation between proximal internal carotid artery (ICA) steno-occlusive disease and DWT in ipsilateral petrous ICA. Symptomatic patients with atherosclerotic stenosis (>0%) in proximal ICA were recruited and underwent carotid MR vessel wall imaging. The 3D motion sensitized-driven equilibrium prepared rapid gradient-echo (3D-MERGE) was acquired for characterizing the wall thickness and longitudinal extent of the lesions in petrous ICA and the distance from proximal lesion to the petrous ICA. The stenosis degree in proximal ICA was measured on the time-of-flight (TOF) images. In total, 166 carotid arteries from 125 patients (mean age 61.0 ± 10.5 years, 99 males) were eligible for final analysis and 64 showed DWT in petrous ICAs. The prevalence of severe DWT in petrous ICA was 1.4%, 5.3%, 5.9%, and 80.4% in ipsilateral proximal ICAs with stenosis category of 1%-49%, 50%-69%, 70%-99%, and total occlusion, respectively. Proximal ICA stenosis was significantly correlated with the wall thickness in petrous ICA (r = 0.767, P < 0.001). Logistic regression analysis showed that proximal ICA stenosis was independently associated with DWT in ipsilateral petrous ICA (odds ratio (OR) = 2.459, 95% confidence interval (CI) 1.896-3.189, P < 0.001). Proximal ICA steno-occlusive disease is independently associated with DWT in ipsilateral petrous ICA. (orig.)

  14. Strength analysis of refueling machine for large PWR in nuclear power plant

    International Nuclear Information System (INIS)

    Jia Xiaofeng; Zhou Guofeng; Bi Xiangjun; Ji Shunying

    2010-01-01

    The refueling machine of PWR plays important roles in nuclear power plant operation,and the dynamic analysis and strength assessment should be carried out to check its safety. In this paper, the finite element model (FEM) was established with the software ANSYS 12 for the refueling machine structure of large 1 000 MW PWR. The dynamic computations were performed under three work conditions, i.e. normal (cart starting and braking), abnormal (OBE) and accident(SSE) conditions, respectively. The structure responses (internal force and stress) of refueling machine under earthquake response spectrum in three directions were combined with the method of square root of square sum (SRSS). Moreover, the static response under gravity was also considered to construct the most critical conditions. With the simulated results, the strength of main structure, bold and weld joint,and the stability of landing leg for additional crane were assessed based on the RCCM code. At last, the local stress analysis of finger-form hook, which function is to take fuel assemblies, was also analyzed, while its strength was also assessed. The results show that the strengths of the refueling machine under various working conditions can meet the safety requirements. (authors)

  15. Investigating the cooling ability of reactor vessel head injection in the Maanshan PWR using CFD simulation

    International Nuclear Information System (INIS)

    Tseng Yungshin; Lin Chihhung; Wan Jongrong; Shih Chunkuan; Tsai, F. Peter

    2011-01-01

    In order to reduce the crack growth rate on the welding of penetration pipe, Pressurized Water Reactor (PWR) of Maanshan nuclear power plant (NPP) uses vessel head injection to cool vessel lid and control rod driving components. The injection flow from the cold leg is drained by the pressure difference between cold leg and upper internal components. In this study, 10 million meshes model with 4 sub-models have been developed to simulate the thermal-hydraulic behavior by commercial CFD program FLUENT. The results indicate that the injection nozzles can provide good cooling ability to reduce the maximum temperature for lid on the vessel head. The maximum temperature of vessel lid is about 293.81degC. Based on the simulated temperature, ASME CODE N-729-1 was further used to recount the effective degradation years (EDY) and reinspection years (RIY) factors. It demonstrates that the EDY and RIY factors are still less than 1.0. Therefore, the re-inspection period for Maanshan PWR would not be significantly affected by the miner temperature difference. (author)

  16. Seismic analysis of a PWR 900 reactor: study of reactor building with soil-structure interaction and evaluation of floor spectra

    International Nuclear Information System (INIS)

    Gantenbein, F.; Aguilar, J.

    1983-08-01

    The purpose of this paper is the evaluation of seismic response and floor spectra for a typical PWR 900 reactor building with respect to soil-structure interaction for soil stiffness). The typical PWR 900 reactor building consists of a concrete cylindrical external building and roof dome, a concrete internal structure (internals) on a common foundation mat as illustrated. The seismic response is obtained by SRSS method and floor spectra directly from ground spectrum and modal properties of the structure. Seismic responses and floor spectra computation is performed in the case of two different ground spectra: EDF spectrum (mean of oscillator spectra obtained from 8 californian records) normalized to 0.2 g, and DSN spectrum (typical of shallow seism) normalized to 0.3 g. The first section is devoted to internals' modelisation, the second one to the axisymmetric model of the reactor, the third one to the seismic response, the fourth one to floor spectra

  17. International

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    This rubric reports on 10 short notes about international economical facts about nuclear power: Electricite de France (EdF) and its assistance and management contracts with Eastern Europe countries (Poland, Hungary, Bulgaria); Transnuclear Inc. company (a 100% Cogema daughter company) acquired the US Vectra Technologies company; the construction of the Khumo nuclear power plant in Northern Korea plays in favour of the reconciliation between Northern and Southern Korea; the delivery of two VVER 1000 Russian reactors to China; the enforcement of the cooperation agreement between Euratom and Argentina; Japan requested for the financing of a Russian fast breeder reactor; Russia has planned to sell a floating barge-type nuclear power plant to Indonesia; the control of the Swedish reactor vessels of Sydkraft AB company committed to Tractebel (Belgium); the renewal of the nuclear cooperation agreement between Swiss and USA; the call for bids from the Turkish TEAS electric power company for the building of the Akkuyu nuclear power plant answered by three candidates: Atomic Energy of Canada Limited (AECL), Westinghouse (US) and the French-German NPI company. (J.S.)

  18. Evaluation of PWR and BWR pin cell benchmark results

    International Nuclear Information System (INIS)

    Pijlgroms, B.J.; Gruppelaar, H.; Janssen, A.J.; Hoogenboom, J.E.; Leege, P.F.A. de; Voet, J. van der; Verhagen, F.C.M.

    1991-12-01

    Benchmark results of the Dutch PINK working group on PWR and BWR pin cell calculational benchmark as defined by EPRI are presented and evaluated. The observed discrepancies are problem dependent: a part of the results is satisfactory, some other results require further analysis. A brief overview is given of the different code packages used in this analysis. (author). 14 refs., 9 figs., 30 tabs

  19. Evaluation of PWR and BWR pin cell benchmark results

    Energy Technology Data Exchange (ETDEWEB)

    Pijlgroms, B.J.; Gruppelaar, H.; Janssen, A.J. (Netherlands Energy Research Foundation (ECN), Petten (Netherlands)); Hoogenboom, J.E.; Leege, P.F.A. de (Interuniversitair Reactor Inst., Delft (Netherlands)); Voet, J. van der (Gemeenschappelijke Kernenergiecentrale Nederland NV, Dodewaard (Netherlands)); Verhagen, F.C.M. (Keuring van Electrotechnische Materialen NV, Arnhem (Netherlands))

    1991-12-01

    Benchmark results of the Dutch PINK working group on PWR and BWR pin cell calculational benchmark as defined by EPRI are presented and evaluated. The observed discrepancies are problem dependent: a part of the results is satisfactory, some other results require further analysis. A brief overview is given of the different code packages used in this analysis. (author). 14 refs., 9 figs., 30 tabs.

  20. Studies of a small PWR for onsite industrial power

    International Nuclear Information System (INIS)

    Klepper, O.H.; Smith, W.R.

    1977-01-01

    Information on the use of a 300 to 400 MW(t) PWR type reactor for industrial applications is presented concerning the potential market, reliability considerations, reactor plant description, construction techniques, comparison between nuclear and fossil-fired process steam costs, alternative fossil-fired steam supplies, and industrial application

  1. Make use of EDF orientations in PWR fuel management

    International Nuclear Information System (INIS)

    Gloaguen, A.

    1989-01-01

    The EDF experience acquired permits to allow the PWR fuel performances and to make use of better management. In this domain low progress can be given considerable financial profits. The industrial and commercial structures, the time constant of the fuel cycle, has for consequence that the electric utilities can take advantage only progressively of the expected profits [fr

  2. Parameterized representation of macroscopic cross section for PWR reactor

    International Nuclear Information System (INIS)

    Fiel, João Cláudio Batista; Carvalho da Silva, Fernando; Senra Martinez, Aquilino; Leal, Luiz C.

    2015-01-01

    Highlights: • This work describes a parameterized representation of the homogenized macroscopic cross section for PWR reactor. • Parameterization enables a quick determination of problem-dependent cross-sections to be used in few group calculations. • This work allows generating group cross-section data to perform PWR core calculations without computer code calculations. - Abstract: The purpose of this work is to describe, by means of Chebyshev polynomials, a parameterized representation of the homogenized macroscopic cross section for PWR fuel element as a function of soluble boron concentration, moderator temperature, fuel temperature, moderator density and 235 92 U enrichment. The cross-section data analyzed are fission, scattering, total, transport, absorption and capture. The parameterization enables a quick and easy determination of problem-dependent cross-sections to be used in few group calculations. The methodology presented in this paper will allow generation of group cross-section data from stored polynomials to perform PWR core calculations without the need to generate them based on computer code calculations using standard steps. The results obtained by the proposed methodology when compared with results from the SCALE code calculations show very good agreement

  3. Dissolution process for advanced-PWR-type fuels

    International Nuclear Information System (INIS)

    Black, D.E.; Decker, L.A.; Pearson, L.G.

    1979-01-01

    The new Fluorinel Dissolution Process and Fuel Storage (FAST) Facility at ICPP will provide underwater storage of spent PWR fuel and a new head-end process for fuel dissolution. The dissolution will be two-stage, using HF and HNO 3 , with an intermittent H 2 SO 4 dissolution for removing stainless steel components. Equipment operation is described

  4. Design of a PWR emergency core cooling simulator loop

    International Nuclear Information System (INIS)

    Melo, C.A. de.

    1982-12-01

    The preliminary design of a PWR Emergency Core Cooling Simulator Loop for investigations of the phenomena involved in a postulated Loss-of-Coolant Accident, during the Reflooding Phase, is presented. The functions of each component of the loop, the design methods and calculations, the specification of the instrumentation, the system operation sequence, the materials list and a cost assessment are included. (Author) [pt

  5. Is it possible to improve regulation system of PWR

    International Nuclear Information System (INIS)

    Bonnemay, A.; Martinez, J.M.

    1983-03-01

    This paper deals with two problems: first of all, it presents the critical analysis of usually implemented general regulation systems, on PWR plants, and derives from it same possibilities to improve the transient behavior of reactor, the second part is a proposition from an automatic control system for spatial distribution of flux

  6. Coolant flow monitoring in a PWR core using noise analysis

    International Nuclear Information System (INIS)

    Kostic, Lj.

    1992-01-01

    Experimental investigations of the neutron and temperature noise field have been performed in the 1350 MW PWR nuclear power plant. Evaluation in the low frequency range, where both feedback effects and different thermohydraulics phenomena are dominant, succeeded in measuring the coolant velocity. This is important for determination and localization of essential deviations and possible anomalies. (author)

  7. Contribution to study and design of PWR plant simulation code

    International Nuclear Information System (INIS)

    Delourme, Didier.

    1980-11-01

    This paper presents an improvement of PICOLO, a package for PWR plants simulation. Its describes principally the integration to the code of a primary loop and pressurizer model and the corresponding control loops. Fast transients are tested on the packages and results are compared with real transients obtained on plants [fr

  8. Performance of PWR Nuclear power plants, up to 1985

    International Nuclear Information System (INIS)

    Muniz, A.A.

    1987-01-01

    The performance of PWR nuclear power plants is studied, based on operational data up to 1985. The availability analysis was made with 793 unit-year and the reliability analysis was made with 5851 unit x month. The results were discussed and the availability of those nuclear power plants were estimated. (E.G.) [pt

  9. PWR auxiliary systems, safety and emergency systems, accident analysis, operation

    International Nuclear Information System (INIS)

    Meyer, P.J.

    1976-01-01

    The author presents a description of PWR auxiliary systems like volume control, boric acid control, coolant purification, -degassing, -storage and -treatment system and waste processing systems. Residual heat removal systems, emergency systems and containment designs are discussed. As an accident analysis the author gives a survey over malfunctions and disturbances in the field of reactor operations. (TK) [de

  10. The new French code for PWR in service inspection

    Energy Technology Data Exchange (ETDEWEB)

    Noel, R; Hutin, J P [Electricite de France (EDF), 75 - Paris (France)

    1988-12-31

    This document presents the new french code for pressured water reactor in service inspection. The historic regulatory basis is presented, together with the new regulatory act (dating back to the 26 february 1974) and the major guidelines of the french practice for in service inspection of PWR components. (TEC).

  11. Influence of boron reduction strategies on PWR accident management flexibility

    International Nuclear Information System (INIS)

    Papukchiev, Angel Aleksandrov; Liu, Yubo; Schaefer, Anselm

    2007-01-01

    In conventional pressurized water reactor (PWR) designs, soluble boron is used for reactivity control over core fuel cycle. Design changes to reduce boron concentration in the reactor coolant are of general interest regarding three aspects - improved reactivity feedback properties, lower impact of boron dilution scenarios on PWR safety and eventually more flexible accident management procedures. In order to assess the potential advantages through the introduction of boron reduction strategies in current PWRs, two low boron core configurations based on fuel with increased utilization of gadolinium and erbium burnable absorbers have been developed. The new PWR designs permit to reduce the natural boron concentration in reactor coolant at begin of cycle to 518 ppm and 805 ppm. For the assessment of the potential safety advantages of these cores a hypothetical beyond design basis accident has been simulated with the system code ATHLET. The analyses showed improved inherent safety and increased accident management flexibility of the low boron cores in comparison with the standard PWR. (author)

  12. Directives and general design requirements for a small PWR

    International Nuclear Information System (INIS)

    Arrieta, L.A.

    1992-08-01

    A proposal of directives and general requirements for the development of a small PWR conceptual design is presented. These directives address the main safety, performance and economic design aspects. The purpose is to use this work as a base for a wide discussion, involving all project participants, culminating with the definition of the final directives and general requirements. (author)

  13. Post irradiation examination on test fuel pins for PWR

    International Nuclear Information System (INIS)

    Fogaca Filho, N.; Ambrozio Filho, F.

    1981-01-01

    Certain aspects of irradiation technology on test fuel pins for PWR, are studied. The results of post irradiation tests, performed on test fuel pins in hot cells, are presented. The results of the tests permit an evaluation of the effects of irradiation on the fuel and cladding of the pin. (Author) [pt

  14. Effects of Burnable Absorbers on PWR Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    O'Leary, P.M.; Pitts, M.L.

    2000-01-01

    Burnup credit is an ongoing issue in designing and licensing transportation and storage casks for spent nuclear fuel (SNF). To address this issue, in July 1999, the U.S. Nuclear Regulatory Commission (NRC), Spent Fuel Project Office, issued Interim Staff Guidance-8 (ISG-8), Revision 1 allowing limited burnup credit for pressurized water reactor (PWR) spent nuclear fuel (SNF) to be used in transport and storage casks. However, one of the key limitations for a licensing basis analysis as stipulated in ISG-8, Revision 1 is that ''burnup credit is restricted to intact fuel assemblies that have not used burnable absorbers''. Because many PWR fuel designs have incorporated burnable-absorber rods for more than twenty years, this restriction places an unnecessary burden on the commercial nuclear power industry. This paper summarizes the effects of in-reactor irradiation on the isotopic inventory of PWR fuels containing different types of integral burnable absorbers (BAs). The work presented is illustrative and intended to represent typical magnitudes of the reactivity effects from depleting PWR fuel with different types of burnable absorbers

  15. Mounting and Alignment of IXO Mirror Segments

    Science.gov (United States)

    Chan, Kai-Wing; Zhang, William; Evans, Tyler; McClelland, Ryan; Hong, Melinda; Mazzarella, James; Saha, Timo; Jalota, Lalit; Olsen, Lawrence; Byron, Glenn

    2010-01-01

    A suspension-mounting scheme is developed for the IXO (International X-ray Observatory) mirror segments in which the figure of the mirror segment is preserved in each stage of mounting. The mirror, first fixed on a thermally compatible strongback, is subsequently transported, aligned and transferred onto its mirror housing. In this paper, we shall outline the requirement, approaches, and recent progress of the suspension mount processes.

  16. Zinc injection in German PWR plants

    International Nuclear Information System (INIS)

    Streit, K.

    2004-01-01

    Operating experience acquired at PWR NNPs shows that zinc injection at low concentrations of 5 ppb is a very effective source term reduction measure. This method does not lead to any operating restrictions or other negative effects on plant systems and components. The nuclear industry has been very successful in reducing radiation exposures within the past two decades. Annual exposures could be significantly decreased and are now at a level of around 1 man-Sv per plant and year. This great success can mainly be attributed to the general commitment of plant operators to maintaining radiation exposures of workers in the controlled access area as low as reasonably achievable (ALARA principle). The ALARA principle, of course, also implies evaluation of the economic benefit of radiation protection measures. Radiation source term reduction has drawn increasing attention of plant operators in recent years. For the new PWRs cobalt-based alloys in the primary system have successively been eliminated already at the design and construction phase within the last decade. Use of wear-resistant cobalt-free substitute materials in combination with the general use of advanced alloys for the steam generator tubing of PWRs resulted in low values for the two most common sources of plant radiation fields, namely 58 Co and 60 Co. Investigations showed that the beneficial effect of zinc can be related to its high affinity for mixed spinel oxide phases, resulting in the following two basic effects: -Zinc is incorporated preferentially into the oxide layer on primary system surfaces and thus reduces pickup of 58 Co and 60 Co and - Zinc can displace cobalt isotopes from existing oxide layers. In German PWRs with Incoloy 800 steam generator tubing material (Ni-content -32%), the observed reductions correspond to a decrease in dose rates of around 10 to 15% per year and thus follow, as predicted, the half-life time of 60 Co. Overall reductions in high radiation areas are now in the range of

  17. PWR-GALE, Radioactive Gaseous Release and Liquid Release from PWR

    International Nuclear Information System (INIS)

    Chandrasekaran, T.; Lee, J.Y.; Willis, C.A.

    1988-01-01

    1 - Description of program or function: The PWR-GALE (Boiling Water Reactor Gaseous and Liquid Effluents) Code is a computerized mathematical model for calculating the release of radioactive material in gaseous and liquid effluents from pressurized water reactors (PWRs). The calculations are based on data generated from operating reactors, field tests, laboratory tests, and plant-specific design considerations incorporated to reduce the quantity of radioactive materials that may be released to the environment. 2 - Method of solution: GALE calculates expected releases based on 1) standardized coolant activities derived from ANS Standards 18.1 Working Group recommendations, 2) release and transport mechanisms that result in the appearance of radioactive material in liquid and gaseous waste streams, 3) plant-specific design features used to reduce the quantities of radioactive materials ultimately released to the environs, and 4) information received on the operation of nuclear power plants. 3 - Restrictions on the complexity of the problem: The liquid release portion of GALE uses subroutines taken from the ORIGEN (CCC-217) to calculate radionuclide buildup and decay during collection, processing, and storage of liquid radwaste. Memory requirements for this part of the program are determined by the large nuclear data base accessed by these subroutines

  18. Study of development of non-destructive method for determining FGR from high burned PWR type fuel rod

    International Nuclear Information System (INIS)

    Yanagisawa, Kazuaki; Miyanishi, Hideyuki; Kitagawa, Isamu; Iida, Shozo; Ito, Tadaharu; Amano, Hidetoshi.

    1991-11-01

    Experimental study was made to evaluate the FGR (Fission Product Gas Release) from high burned PWR type fuel rods by means of non-destructive method through measurement of the gamma activity of 85 Kr isotope which was accumulated in the fuel top plenum. Experimental result shows that it is possible to know the amounts of FGR at fuel plenum by the equations given in the followings. FGR = 0.28C/V f or FGR = 0.07C where, FGR (%) is the amounts of Xe and Kr released from UO 2 fuel, C (counts/h) the radioactivity of 85 Kr at plenum of the tested fuel rod and V f (ml) the plenum volume of the tested fuel rod, respectively. The present study was made by using 14 x 14 PWR type fuel rods preirradiated up to the burn-up of 42.1 MWd/kgU, followed by the pulse irradiation at Nuclear Safety Research Reactor of Japan Atomic Energy Research Institute (JAERI). The FGR of the tested segmented fuel rods were measured by puncturing and found to range from 0.6% to 12% according to the magnitude of the deposited energy given by pulse. Estimated experimental error bands against the above equations were within plus minus 30%. (author)

  19. Gadolinia experience and design for PWR fuel cycles

    International Nuclear Information System (INIS)

    Stephenson, L. C.

    2000-01-01

    The purpose of this paper is to describe Siemens Power Corporation's (SPC) current experience with the burnable absorber gadolinia in PWR fuel assemblies, including optimized features of SPC's PWR gadolinia designs, and comparisons with other burnable absorbers. Siemens is the world leader in PWR gadolinia experience. More than 5,900 Siemens PWR gadolinia-bearing fuel assemblies have been irradiated. The use of gadolinia-bearing fuel provides significant flexibility in fuel cycle designs, allows for low radial leakage fuel management and extended operating cycles, and reduces BOC (beginning-of-cycle) soluble boron concentrations. The optimized use of an integral burnable neutron absorber is a design feature which provides improved economic performance for PWR fuel assemblies. This paper includes a comparison between three different types of integral burnable absorbers: gadolinia, Zirconium diboride and erbia. Fuel cycle design studies performed by Siemens have shown that the enrichment requirements for 18-24 month fuel cycles utilizing gadolinia or zirconium diboride integral fuel burnable absorbers can be approximately the same. Although a typical gadolinia residual penalty for a cycle design of this length is as low as 0.02-0.03 wt% U-235, the design flexibility of gadolinia allows for very aggressive low-leakage core loading plans which reduces the enrichment requirements for gadolinia-bearing fuel. SPC has optimized its use of gadolinia in PWR fuel cycles. Typically, low (2-4) weight percent Gd 2 O 3 is used for beginning to middle of cycle reactivity hold down as well as soluble boron concentration holddown at BOC. Higher concentrations of Gd 2 O 3 , such as 6 and 8 wt%, are used to control power peaking in assemblies later in the cycle. SPC has developed core strategies that maximize the use of lower gadolinia concentrations which significantly reduces the gadolinia residual reactivity penalty. This optimization includes minimizing the number of rods with

  20. Segmentation, advertising and prices

    NARCIS (Netherlands)

    Galeotti, Andrea; Moraga González, José

    This paper explores the implications of market segmentation on firm competitiveness. In contrast to earlier work, here market segmentation is minimal in the sense that it is based on consumer attributes that are completely unrelated to tastes. We show that when the market is comprised by two

  1. Sipunculans and segmentation

    DEFF Research Database (Denmark)

    Wanninger, Andreas; Kristof, Alen; Brinkmann, Nora

    2009-01-01

    mechanisms may act on the level of gene expression, cell proliferation, tissue differentiation and organ system formation in individual segments. Accordingly, in some polychaete annelids the first three pairs of segmental peripheral neurons arise synchronously, while the metameric commissures of the ventral...

  2. Fuel assembly loads during a hypothetical blowdown event in a PWR

    International Nuclear Information System (INIS)

    Stabel, J.; Bosanyi, B.; Kim, J.D.

    1991-01-01

    As a consequence of a hypothetical sudden break of the main coolant pipe of a PWR, RPV-internals and fuel assemblies (FA's) are undergoing horizontal and vertical motions. FA's may impact against each other, against core shroud or against lower core support. The corresponding impact loads must be absorbed by the FA spacer grids and guide thimbles. In this paper FA-loads are calculated with and without consideration of Fluid-Structure-Interaction (FSI) effects for assumed different break sizes of the main coolant pipe. The analysis has been performed for a hypothetical cold leg break of a typical SIEMENS-4 loop plant. For this purpose the codes DAPSY/DAISY (GRS, Germany) were coupled with the structural code KWUSTOSS (SIEMENS). It is shown that the FA loads obtained in calculations with consideration of FSI effects are by a factor of 2-4 lower than those obtained in the corresponding calculations without consideration of FSI. (author)

  3. On the failure probability of the primary piping of the PWR

    International Nuclear Information System (INIS)

    Schueller, G.I.; Hampl, N.C.

    1984-01-01

    A methodology for quantification of the structural reliability of the primary piping (PP) of a PWR under operational and accidental conditions is developed. Biblis B is utilized as reference plant. The PP structure is modeled utilizing finite element procedures. Based on the properties of the operational and internal accidental conditions, a static analysis suffices. However, a dynamic analysis considering non-linear effects of the soil-structure-interaction is to be used to determine load effects due to earthquake induced loading. Considering realistically the presence of initial cracks in welds and considering annual frequencies of occurrence of the various loading conditions, a crack propagation calculation utilizing the Forman model is carried out. Simultaneously leak and break probabilities using the 'Two Criteria'-Aproach are computed. A Monte Carlo simulation procedure is used as method of solution. (Author) [pt

  4. French analytic experiment on the high specific burnup of PWR fuels in normal conditions

    International Nuclear Information System (INIS)

    Bruet, M.; Atabek, R.; Houdaille, B.; Baron, D.

    1982-04-01

    Hydrostatic density determinations made on UO 2 pellets of different kinds irradiated in conditions representative of PWR conditions enable the internal swelling rate of the UO 2 to be ascertained. A mean value of 0.8% per 10 4 MWdt -1 (u) up to a specific burnup of 45000 MWdt -1 (u) may be deduced from this experimental basis. These results agree well with those obtained in the TANGO experiments in which UO 2 balls were irradiated in quasi isothermal conditions and without stress. Further, the open porosity of oxide closes progressively and the change in the total porosity is thus very limited (under 1% at 45000 MWdt -1 (u)). With respect to the swelling of the pellets the rise in the specific burnup would not appear therefore to be a problem. The behaviour of recrystallized zircaloy 4 claddings remains satisfactory with respect to creep and growth during irradiation [fr

  5. Instrumentation of fuel safety test rods of the PWR system in the Phebus reactor

    International Nuclear Information System (INIS)

    Schley, Robert; Leveque, J.P.; Aujollet, J.M.; Dutraive, Pierre; Colome, Jean; Bouly, J.C.

    1979-01-01

    The tests were performed in an experimental cell centred in the core of the PHEBUS water reactor of 50 MW. The CEA make two types of apparatus for testing the safety of PWR fuel. One is for testing a single fuel stick and the other a bunch of 25 sticks. The instrumentation described enables the main parameters of the test to be known: temperatures of the fuel - central temperature of the UO 2 - cladding surface temperatures; temperature of the cooling circuits - thermal balance - temperatures of the structures, etc.; coolant pressure; internal pressure of the fuel sticks; direction and flow rate of the fluid. This instrumentation and the technological problems to be overcome are described and the results of the first tests carried out are given [fr

  6. Methodology of a PWR containment analysis during a thermal-hydraulic accident

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Dayane F.; Sabundjian, Gaiane; Lima, Ana Cecilia S., E-mail: dayane.silva@usp.br, E-mail: gdjian@ipen.br, E-mail: aclima@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The aim of this work is to present the methodology of calculation to Angra 2 reactor containment during accidents of the type Loss of Coolant Accident (LOCA). This study will be possible to ensure the safety of the population of the surroundings upon the occurrence of accidents. One of the programs used to analyze containment of a nuclear plant is the CONTAIN. This computer code is an analysis tool used for predicting the physical conditions and distributions of radionuclides inside a containment building following the release of material from the primary system in a light-water reactor during an accident. The containment of the type PWR plant is a concrete building covered internally by metallic material and has limits of design pressure. The methodology of containment analysis must estimate the limits of pressure during a LOCA. The boundary conditions for the simulation are obtained from RELAP5 code. (author)

  7. Life time estimation for irradiation assisted mechanical cracking of PWR RCCA rodlets

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, Takanori; Yamaguchi, Youichirou [Nuclear Development Corp., Tokai, Ibaraki (Japan)

    1999-09-01

    Intergranular cracks of cladding tubes had been observed at the tips of the rodlets of PWR rod cluster control assemblies (RCCAs). Because RCCAs were important core components, an investigation was carried out to estimate their service lifetime. The reviews on their mechanism and the life time estimation are shown in this paper. The summaries are as follows. (1) The mechanism of the intergranular crack of the cladding tube was not IASCC but irradiation assisted mechanical cracking (IAMC) caused by an increase in hoop strain due to the swelling of the absorber and a decrease in elongation due to neutron irradiation. (2) The crack initiation limit of cylindrical shells made of low ductile material and subjected to internal pressure was determined in relation to the uniform strain of the material and was in accordance with that of the RCCA rodlets in an actual plant. (3) From the above investigation, the method of estimating the lifetime and countermeasures for its extension were obtained. (author)

  8. Methodology of a PWR containment analysis during a thermal-hydraulic accident

    International Nuclear Information System (INIS)

    Silva, Dayane F.; Sabundjian, Gaiane; Lima, Ana Cecilia S.

    2015-01-01

    The aim of this work is to present the methodology of calculation to Angra 2 reactor containment during accidents of the type Loss of Coolant Accident (LOCA). This study will be possible to ensure the safety of the population of the surroundings upon the occurrence of accidents. One of the programs used to analyze containment of a nuclear plant is the CONTAIN. This computer code is an analysis tool used for predicting the physical conditions and distributions of radionuclides inside a containment building following the release of material from the primary system in a light-water reactor during an accident. The containment of the type PWR plant is a concrete building covered internally by metallic material and has limits of design pressure. The methodology of containment analysis must estimate the limits of pressure during a LOCA. The boundary conditions for the simulation are obtained from RELAP5 code. (author)

  9. Polynomial parameterized representation of macroscopic cross section for PWR reactor

    International Nuclear Information System (INIS)

    Fiel, Joao Claudio B.

    2015-01-01

    The purpose of this work is to describe, by means of Tchebychev polynomial, a parameterized representation of the homogenized macroscopic cross section for PWR fuel element as a function of soluble boron concentration, moderator temperature, fuel temperature, moderator density and 235 U 92 enrichment. Analyzed cross sections are: fission, scattering, total, transport, absorption and capture. This parameterization enables a quick and easy determination of the problem-dependent cross-sections to be used in few groups calculations. The methodology presented here will enable to provide cross-sections values to perform PWR core calculations without the need to generate them based on computer code calculations using standard steps. The results obtained by parameterized cross-sections functions, when compared with the cross-section generated by SCALE code calculations, or when compared with K inf , generated by MCNPX code calculations, show a difference of less than 0.7 percent. (author)

  10. PWR plant transient analyses using TRAC-PF1

    International Nuclear Information System (INIS)

    Ireland, J.R.; Boyack, B.E.

    1984-01-01

    This paper describes some of the pressurized water reactor (PWR) transient analyses performed at Los Alamos for the US Nuclear Regulatory Commission using the Transient Reactor Analysis Code (TRAC-PF1). Many of the transient analyses performed directly address current PWR safety issues. Included in this paper are examples of two safety issues addressed by TRAC-PF1. These examples are pressurized thermal shock (PTS) and feed-and-bleed cooling for Oconee-1. The calculations performed were plant specific in that details of both the primary and secondary sides were modeled in addition to models of the plant integrated control systems. The results of these analyses show that for these two transients, the reactor cores remained covered and cooled at all times posing no real threat to the reactor system nor to the public

  11. Material property changes of stainless steels under PWR irradiation

    International Nuclear Information System (INIS)

    Fukuya, Koji; Nishioka, Hiromasa; Fujii, Katsuhiko; Kamaya, Masayuki; Miura, Terumitsu; Torimaru, Tadahiko

    2009-01-01

    Structural integrity of core structural materials is one of the key issues for long and safe operation of pressurized water reactors. The stainless steel components are exposed to neutron irradiation and high-temperature water, which cause significant property changes and irradiation assisted stress corrosion cracking (IASCC) in some cases. Understanding of irradiation induced material property changes is essential to predict integrity of core components. In the present study, microstructure and microchemistry, mechanical properties, and IASCC behavior were examined in 316 stainless steels irradiated to 1 - 73 dpa in a PWR. Dose-dependent changes of dislocation loops and cavities, grain boundary segregation, tensile properties and fracture mode, deformation behavior, and their interrelation were discussed. Tensile properties and deformation behavior were well coincident with microstructural changes. IASCC susceptibility under slow strain rate tensile tests, IASCC initiation under constant load tests in simulated PWR primary water, and their relationship to material changes were discussed. (author)

  12. Application of digital control in Japanese PWR Plants

    International Nuclear Information System (INIS)

    Taguchi, S.; Kondo, Y.; Teranishi, S.; Matsumiya, M.; Takashima, M.; Nagai, T.

    1986-01-01

    More reliable and flexible control system to improve the plant availability and operability is constantly demanded. In order to answer the demands, digital control systems are being applied to Japanese PWR plants. Microprocessor-based digital control systems are widely used in other industries and show good performance. The digital control system has been already applied to the chemical and volume control system and the radioactive waste disposal system in the operating plants. These systems have been working as expected and demonstrating good performances. The digital control system for the reactor control system, which is the main control system of the PWR plants, is being developed. The design of the system has been already finished and the verification/validation process is now in progress

  13. A concept of PWR using plate and shell heat exchangers

    International Nuclear Information System (INIS)

    Freire, Luciano Ondir; Andrade, Delvonei Alves de

    2015-01-01

    In previous work it was verified the physical possibility of using plate and shell heat exchangers for steam generation in a PWR for merchant ships. This work studies the possibility of using GESMEX commercial of the shelf plate and shell heat exchanger of series XPS. It was found it is feasible for this type of heat exchanger to meet operational and accidental requirements for steam generation in PWR. Additionally, it is proposed an arrangement of such heat exchangers inside the reactor pressure vessel. Such arrangement may avoid ANSI/ANS51.1 nuclear class I requirements on those heat exchangers because they are contained in the reactor coolant pressure barrier and play no role in accidental scenarios. Additionally, those plates work under compression, preventing the risk of rupture. Being considered non-nuclear safety, having a modular architecture and working under compression may turn such architectural choice a must to meet safety objectives with improved economics. (author)

  14. The development of flow test technology for PWR fuel assembly

    International Nuclear Information System (INIS)

    Chung, Moon Ki; Cha, Chong Hee; Chung, Chang Hwan; Chun, Se Young; Song, Chul Hwa; Chung, Heung Joon; Won, Soon Yeun; Cho, Yeong Rho; Kim, Bok Deuk

    1988-05-01

    KAERI has an extensive program to develope PWR fuel assembly. In relation to the program, development of flow test technology is needed to evaluate the thermal hydraulic compactibility and mechanical integrity of domestically fabricated nuclear fuels. A high-pressure and high-temperature flow test facility was designed to test domestically fabricated fuel assembly. The test section of the facility has capacity of a 6x6 full length PWR fuel assembly. A flow test rig was designed and installed at Cold Test Loop to carry out model experiments with 5x5 rod assembly under atmosphere pressure to get information about the characteristics of pressure loss of spacer grids and velocity distribution in the subchannels. LDV measuring technology was established using TSI's Laser Dopper Velocimeter 9100-3 System

  15. Industrial assessment of nonbackfittable PWR design modifications. Final report

    International Nuclear Information System (INIS)

    Matzie, R.A.; Daleas, R.S.; Miller, D.D.

    1980-11-01

    As part of the US Department of Energy's Advanced Reactor Design Study, various nonbackfittable PWR design modifications were evaluated to determine their potential for improved uranium utilization and commercial viability. Combustion Engineering, Inc. contributed to this effort through participation in the Battelle Pacific Northwest Laboratory industrial assessment of such design modifications. Seven modifications, including the use of higher primary system temperatures and pressures, rapid-frequent refueling, end-of-cycle stretchout, core periphery modifications, radial blankets, low power density cores, and small PWR assemblies, were evaluated with respect to uranium utilization, economics, technical and operational complexity, and several other subjective considerations. Rapid-frequent refueling was judged to have the highest potential although it would probably not be economical for the majority of reactors with the design assumptions used in this assessment

  16. Electrical and control aspects of the Sizewell B PWR

    International Nuclear Information System (INIS)

    1992-01-01

    The pressurized water reactor, Sizewell-B, which is being built in Suffolk is well on in its construction schedule. This conference looked at the electrical and control aspects of the first PWR to be built in the United Kingdom. Although based on the standard Westinghouse PWR design, modifications have been made to meet the particular requirements of the site and the UK licensing regulations. There are 11 papers on all aspects of the electrical systems, 5 papers on the cables and cable installation, 5 on the main control rooms and auxiliary shutdown room, 5 on the integrated system and centralised operation, 6 on the monitoring and protection systems and 9 on the reactor protection systems. All 41 are indexed separately. (UK)

  17. Serious accidents of PWR type reactors for power generation

    International Nuclear Information System (INIS)

    2008-12-01

    This document presents the great lines of current knowledge on serious accidents relative to PWR type reactors. First, is exposed the physics of PWR type reactor core meltdown and the possible failure modes of the containment building in such a case. Then, are presented the dispositions implemented with regards to such accidents in France, particularly the pragmatic approach that prevails for the already built reactors. Then, the document tackles the case of the European pressurized reactor (E.P.R.), for which the dimensioning takes into account explicitly serious accidents: it is a question of objectives conception and their respect must be the object of a strict demonstration, by taking into account uncertainties. (N.C.)

  18. PWR accident management realated tests: some Bethsy results

    International Nuclear Information System (INIS)

    Clement, P.; Chataing, T.; Deruaz, R.

    1993-01-01

    The BETHSY integral test facility which is a scaled down model of a 3 loop FRAMATOME PWR and is currently operated at the Nuclear Center of Grenoble, forms an important part of the French strategy for PWR Accident Management. In this paper the features of both the facility and the experimental program are presented. Two accident transients: a total loss of feedwater and a 2'' cold leg break in case of High Pressure Safety Injection System failure, involving either Event Oriented - or State Oriented-Emergency Operating Procedures (EO-EOP or SO-EOP) are described and the system response analyzed. CATHARE calculation results are also presented which illustrate the ability of this code to adequately predict the key phenomena of these transients. (authors). 13 figs., 11 refs., 2 tabs

  19. A nodal model for the simulation of a PWR core

    International Nuclear Information System (INIS)

    Souza Pinto, R. de.

    1981-06-01

    A computer program FORTRAN language was developed to simulate the neutronic and thermal-hydraulic transient behaviour of a PWR reactor core. The reator power is calculated using a point kinectics model with six groups of delayed neutron precursors. The fission product decay heat was considered assuming three effective decay heat groups. A nodal model was employed for the treatment of heat transfer in the fuel rod, with integration of the heat equation by the lumped parameter technique. Axial conduction was neglected. A single-channel nodal model was developed for the thermo-hydrodynamic simulation using mass and energy conservation equations for the control volumes. The effect of the axial pressure variation was neglected. The computer program was tested, with good results, through the simulation of the transient behaviour of postulated accidents in a typical PWR. (Author) [pt

  20. Condensate polishing guidelines for PWR and BWR plants

    International Nuclear Information System (INIS)

    Robbins, P.; Crinigan, P.; Graham, B.; Kohlmann, R.; Crosby, C.; Seager, J.; Bosold, R.; Gillen, J.; Kristensen, J.; McKeen, A.; Jones, V.; Sawochka, S.; Siegwarth, D.; Keeling, D.; Polidoroff, T.; Morgan, D.; Rickertsen, D.; Dyson, A.; Mills, W.; Coleman, L.

    1993-03-01

    Under EPRI sponsorship, an industry committee, similar in form and operation to other guideline committees, was created to develop Condensate Polishing Guidelines for both PWR and BWR systems. The committee reviewed the available utility and water treatment industry experience on system design and performance and incorporated operational and state-of-the-art information into document. These guidelines help utilities to optimize present condensate polisher designs as well as be a resource for retrofits or new construction. These guidelines present information that has not previously been presented in any consensus industry document. The committee generated guidelines that cover both deep bed and powdered resin systems as an integral part of the chemistry of PWR and BWR plants. The guidelines are separated into sections that deal with the basis for condensate polishing, system design, resin design and application, data management and performance and management responsibilities

  1. The plutonium recycle for PWR reactors from brazilian nuclear program

    International Nuclear Information System (INIS)

    Rubini, L.A.

    1978-01-01

    The purpose of this thesis is to evaluate the material requirements of the nuclear fuel cycle with plutonium recycle. The study starts with the calculation of a reference reactor and has flexibility to evaluate the demand under two alternatives of nuclear fuel cycle for Pressurized Water Reactors (PWR): Without plutonium recycle; and with plutonium recycle. Calculations of the reference reactor have been carried out with the CELL-CORE codes. Variations in the material requirements were studied considering changes in the installed nuclear capacity of PWR reactors, the capacity factor of these reactors, and the introduction of fast breeders. Recycling plutonium produced inside the system can reach economies of about 5% U 3 O 8 and 6% separative work units if recycle is assumed only after the fifth operation cycle of the thermal reactors. (author)

  2. Calculation of drop course of control rod assembly in PWR

    International Nuclear Information System (INIS)

    Zhou Xiaojia; Mao Fei; Min Peng; Lin Shaoxuan

    2013-01-01

    The validation of control rod drop performance is an important part of safety analysis of nuclear power plant. Development of computer code for calculating control rod drop course will be useful for validating and improving the design of control rod drive line. Based on structural features of the drive line, the driving force on moving assembly was analyzed and decomposed, the transient value of each component of the driving force was calculated by choosing either theoretical method or numerical method, and the simulation code for calculating rod cluster control assembly (RCCA) drop course by time step increase was achieved. The analysis results of control rod assembly drop course calculated by theoretical model and numerical method were validated by comparing with RCCA drop test data of Qinshan Phase Ⅱ 600 MW PWR. It is shown that the developed RCCA drop course calculation code is suitable for RCCA in PWR and can correctly simulate the drop course and the stress of RCCA. (authors)

  3. Report on the PWR-radiation protection/ALARA Committee

    Energy Technology Data Exchange (ETDEWEB)

    Malone, D.J. [Consumers Power Co., Covert, MI (United States)

    1995-03-01

    In 1992, representatives from several utilities with operational Pressurized Water Reactors (PWR) formed the PWR-Radiation Protection/ALARA Committee. The mission of the Committee is to facilitate open communications between member utilities relative to radiation protection and ALARA issues such that cost effective dose reduction and radiation protection measures may be instituted. While industry deregulation appears inevitable and inter-utility competition is on the rise, Committee members are fully committed to sharing both positive and negative experiences for the benefit of the health and safety of the radiation worker. Committee meetings provide current operational experiences through members providing Plant status reports, and information relative to programmatic improvements through member presentations and topic specific workshops. The most recent Committee workshop was facilitated to provide members with defined experiences that provide cost effective ALARA performance.

  4. Assessment of PWR plutonium burners for nuclear energy centers

    International Nuclear Information System (INIS)

    Frankel, A.J.; Shapiro, N.L.

    1976-06-01

    The purpose of the study was to explore the performance and safety characteristics of PWR plutonium burners, to identify modifications to current PWR designs to enhance plutonium utilization, to study the problems of deploying plutonium burners at Nuclear Energy Centers, and to assess current industrial capability of the design and licensing of such reactors. A plutonium burner is defined to be a reactor which utilizes plutonium as the sole fissile addition to the natural or depleted uranium which comprises the greater part of the fuel mass. The results of the study and the design analyses performed during the development of C-E's System 80 plant indicate that the use of suitably designed plutonium burners at Nuclear Energy Centers is technically feasible

  5. A concept of PWR using plate and shell heat exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Freire, Luciano Ondir; Andrade, Delvonei Alves de, E-mail: luciano.ondir@gmail.com, E-mail: delvonei@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    In previous work it was verified the physical possibility of using plate and shell heat exchangers for steam generation in a PWR for merchant ships. This work studies the possibility of using GESMEX commercial of the shelf plate and shell heat exchanger of series XPS. It was found it is feasible for this type of heat exchanger to meet operational and accidental requirements for steam generation in PWR. Additionally, it is proposed an arrangement of such heat exchangers inside the reactor pressure vessel. Such arrangement may avoid ANSI/ANS51.1 nuclear class I requirements on those heat exchangers because they are contained in the reactor coolant pressure barrier and play no role in accidental scenarios. Additionally, those plates work under compression, preventing the risk of rupture. Being considered non-nuclear safety, having a modular architecture and working under compression may turn such architectural choice a must to meet safety objectives with improved economics. (author)

  6. Methodology to evaluate the crack growth rate by stress corrosion cracking in dissimilar metals weld in simulated environment of PWR nuclear reactor

    International Nuclear Information System (INIS)

    Paula, Raphael G.; Figueiredo, Celia A.; Rabelo, Emerson G.

    2013-01-01

    Inconel alloys weld metal is widely used to join dissimilar metals in nuclear reactors applications. It was recently observed failures of weld components in plants, which have triggered an international effort to determine reliable data on the stress corrosion cracking behavior of this material in reactor environment. The objective of this work is to develop a methodology to determine the crack growth rate caused by stress corrosion in Inconel alloy 182, using the specimen (Compact Tensile) in simulated PWR environment. (author)

  7. Evaluation of PWR and BWR pin cell benchmark results

    Energy Technology Data Exchange (ETDEWEB)

    Pilgroms, B.J.; Gruppelaar, H.; Janssen, A.J. (Netherlands Energy Research Foundation (ECN), Petten (Netherlands)); Hoogenboom, J.E.; Leege, P.F.A. de (Interuniversitair Reactor Inst., Delft (Netherlands)); Voet, J. van der (Gemeenschappelijke Kernenergiecentrale Nederland NV, Dodewaard (Netherlands)); Verhagen, F.C.M. (Keuring van Electrotechnische Materialen NV, Arnhem (Netherlands))

    1991-12-01

    Benchmark results of the Dutch PINK working group on the PWR and BWR pin cell calculational benchmark as defined by EPRI are presented and evaluated. The observed discrepancies are problem dependent: a part of the results is satisfactory, some other results require further analysis. A brief overview is given of the different code packages used in this analysis. (author). 14 refs.; 9 figs.; 30 tabs.

  8. Surveillance systems (PWR) - loose parts monitoring - vibration monitoring - leakage detection

    International Nuclear Information System (INIS)

    Schuette, A.; Blaesig, H.

    1982-01-01

    The contribution is engaged in the task and the results of the loose parts monitoring and the vibration monitoring following from the practice at the PWR of Biblis. First a description of both systems - location and type of the sensors used, the treatment of the measurements and the indications - is given. The results of the analysis of some events picked up by the surveillance systems are presented showing applicabilty and benefit of such systems. (orig.)

  9. A model to calculate the burn of gadolinium in PWR

    International Nuclear Information System (INIS)

    Sannazzaro, L.R.

    1983-01-01

    A cell model to calculate the burnup of a PWR fuel element with gadolinium as a poison, projected by KWU, is presented. With the model proposed, the burn of the gadolinium isotopes is analyzed, as well as the effect of these isotopes in the fuel element behaviour. The results obtained with this cell model are compared with those obtained by a conventional cell model. (E.G.) [pt

  10. Conversion rate for PWR reactors in thorium cycle

    International Nuclear Information System (INIS)

    Angelkorte, G.M.

    1980-01-01

    This work concerns to the determination of the conversion-rate for a PWR reactor with an enrichment of 7.47%, considering a cell, geometrically equal to Angra I, composed by Thorium and U-238 in a 1:1 relation. The study was performed considering neutrons of one and two groups of energy, according to the suggestion from other authors sup(1,2). It was also performed a study about the production and consumption of fissile material. (author)

  11. Monte Carlo based radial shield design of typical PWR reactor

    Energy Technology Data Exchange (ETDEWEB)

    Gul, Anas; Khan, Rustam; Qureshi, M. Ayub; Azeem, Muhammad Waqar; Raza, S.A. [Pakistan Institute of Engineering and Applied Sciences, Islamabad (Pakistan). Dept. of Nuclear Engineering; Stummer, Thomas [Technische Univ. Wien (Austria). Atominst.

    2017-04-15

    This paper presents the radiation shielding model of a typical PWR (CNPP-II) at Chashma, Pakistan. The model was developed using Monte Carlo N Particle code [2], equipped with ENDF/B-VI continuous energy cross section libraries. This model was applied to calculate the neutron and gamma flux and dose rates in the radial direction at core mid plane. The simulated results were compared with the reference results of Shanghai Nuclear Engineering Research and Design Institute (SNERDI).

  12. Measured performance of four PWR liquid radioactive waste treatment systems

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Mandler, J.W.; Stalker, A.C.

    1980-01-01

    This paper presents results of a study of the liquid radwaste treatment and boron recovery systems of four operating PWR power plants. The performance of a given system was determined from measurements of radionuclide inventories in samples drawn from demineralizers, evaporators, filters, and gaseous cleanup systems. The plants at which measurements were made are Fort Calhoun, Zion 1 and 2, Turkey Point 3 and 4, and Rancho Seco

  13. Stress analysis on a PWR pressure vessel support structure

    International Nuclear Information System (INIS)

    Cruz, J.R.B.; Mattar Neto, M.; Jesus Miranda, C.A. de.

    1992-01-01

    The paper presents the stress analysis of a research PWR vessel support structure. Different geometries and thermal boundary conditions are evaluated. The finite element analysis is performed using ANSYS program. The ASME Section III criteria are applied for the stress verification and the following points are discussed: stress classification and linearization; jurisdictional boundary between ASME Subsection NB (Class 1 Components) and Subsection NF (Component Supports). (author)

  14. ORNL: PWR-BDHT analysis procedure, a preliminary overview

    International Nuclear Information System (INIS)

    Cliff, S.B.

    1978-01-01

    The computer programs currently used in the analysis of the ORNL-PWR Blowdown Heat Transfer Separate-Effects Program are overviewed. The current linkages and relationships among the programs are given along with general comments about the future directions of some of these programs. The overview is strictly from the computer science point of view with only minimal information concerning the engineering aspects of the analysis procedure

  15. Improvement on main control room for Japanese PWR plants

    International Nuclear Information System (INIS)

    Matsumiya, Masayuki

    1996-01-01

    The main control room which is the information center of nuclear power plant has been continuously improved utilizing the state of the art ergonomics, a high performance computer, computer graphic technologies, etc. For the latest Japanese Pressurized Water Reactor (PWR) plant, the CRT monitoring system is applied as the major information source for facilitating operators' plant monitoring tasks. For an operating plant, enhancement of monitoring and logging functions has been made adopting a high performance computer

  16. A comparative study of fuel management in PWR reactors

    International Nuclear Information System (INIS)

    Barroso, D.E.G.; Nair, R.P.K.; Vellozo, S.O.

    1981-01-01

    A study about fuel management in PWR reactors, where not only the conventional uranium cycle is considered, but also the thorium cycle as an alternative is presented. The final results are presented in terms of U 3 O 8 demand and SWU and the approximate costs of the principal stages of the fuel cycle, comparing with the stardand cycle without recycling. (E.G.) [pt

  17. Fuel rod behavior of a PWR during load following

    International Nuclear Information System (INIS)

    Perrotta, J.A.; Andrade, G.G. de

    1982-01-01

    The behavior of a PWR fuel rod when operating in normal power cycles, excluding in case of accidents, is analysed. A computer code, that makes the mechanical analysis of the cladding using the finite element method was developed. The ramps and power cycles were simulated suposing the existence of cracks in pellets when the cladding-pellet interaction are done. As a result, an operation procedure of the fuel rod in power cycle is recommended. (E.G.) [pt

  18. Ciclon: A neutronic fuel management program for PWR's consecutive cycles

    International Nuclear Information System (INIS)

    Aragones, J.M.

    1977-01-01

    The program description and user's manual of a new computer code is given. Ciclon performs the neutronic calculation of consecutive reload cycles for PWR's fuel management optimization. Fuel characteristics and burnup data, region or batch sizes, loading schemes and state of previously irradiated fuel are input to the code. Cycle lengths or feed enrichments and burnup sharing for each region or batch are calculate using different core neutronic models and printed or punched in standard fuel management format. (author) [es

  19. Fire experiences: principal lessons learned, application in PWR power plants

    International Nuclear Information System (INIS)

    Schoemacker, M.

    1984-01-01

    The article reviews the principal design rules to be borne in mind for PWR nuclear units installation. These rule takes into account: the specific character of materials involved (safety aspect for nuclear construction), experience acquired as a result of fires in EDF production units, and the results obtained from tests carried out by the EDF at Fort de Chelles between 1980 and 1982, especially in the field of PVC cables [fr

  20. Natural circulation in a scaled PWR integral test facility

    International Nuclear Information System (INIS)

    Kiang, R.L.; Jeuck, P.R. III

    1987-01-01

    Natural circulation is an important mechanism for cooling a nuclear power plant under abnormal operating conditions. To study natural circulation, we modeled a type of pressurized water reactor (PWR) that incorporates once-through steam generators. We conducted tests of single-phase natural circulations, two-phase natural circulations, and a boiler condenser mode. Because of complex geometry, the natural circulations observed in this facility exhibit some phenomena not commonly seen in a simple thermosyphon loop

  1. Study on thermal-hydraulics during a PWR reflood phase

    Energy Technology Data Exchange (ETDEWEB)

    Iguchi, Tadashi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-10-01

    In-core thermal-hydraulics during a PWR reflood phase following a large-break LOCA are quite unique in comparison with two-phase flow which has been studied widely in previous researches, because the geometry of the flow path is complicated (bundle geometry) and water is at extremely low superficial velocity and almost under stagnant condition. Hence, some phenomena realized during a PWR reflood phase are not understood enough and appropriate analytical models have not been developed, although they are important in a viewpoint of reactor safety evaluation. Therefore, author investigated some phenomena specified as important issues for quantitative prediction, i.e. (1) void fraction in a bundle during a PWR reflood phase, (2) effect of radial core power profile on reflood behavior, (3) effect of combined emergency core coolant injection on reflood behavior, and (4) the core separation into two thermal-hydraulically different regions and the in-core flow circulation behavior observed during a combined injection PWR reflood phase. Further, author made analytical models for these specified issues, and succeeded to predict reflood behaviors at representative types of PWRs, i.e.cold leg injection PWRs and Combined injection PWRs, in good accuracy. Above results were incorporated into REFLA code which is developed at JAERI, and they improved accuracy in prediction and enlarged applicability of the code. In the present study, models were intended to be utilized in a practical use, and hence these models are simplified ones. However, physical understanding on the specified issues in the present study is basic and principal for reflood behavior, and then it is considered to be used in a future advanced code development and improvement. (author). 110 refs.

  2. ORNL-PWR BDHT analysis procedure: an overview

    International Nuclear Information System (INIS)

    Cliff, S.B.

    1978-01-01

    The key computer programs currently used by the analysis procedure of the ORNL-PWR Blowdown Heat Transfer Separate Effects Program are overviewed with particular emphasis placed on their interrelationships. The major modeling and calculational programs, COBRA, ORINC, ORTCAL, PINSIM, and various versions of RELAP4, are summarized and placed into the perspective of the procedure. The supportive programs, REDPLT, ORCPLT, BDHTPLOT, OXREPT, and OTOCI, and their uses are described

  3. PWR surveillance based on correspondence between empirical models and physical

    International Nuclear Information System (INIS)

    Zwingelstein, G.; Upadhyaya, B.R.; Kerlin, T.W.

    1976-01-01

    An on line surveillance method based on the correspondence between empirical models and physicals models is proposed for pressurized water reactors. Two types of empirical models are considered as well as the mathematical models defining the correspondence between the physical and empirical parameters. The efficiency of this method is illustrated for the surveillance of the Doppler coefficient for Oconee I (an 886 MWe PWR) [fr

  4. SACHET, Dynamic Fission Products Inventory in PWR Multiple Compartment System

    International Nuclear Information System (INIS)

    Kodaira, Hideki

    1990-01-01

    1 - Description of program or function: SACHET evaluates the dynamic fission product inventories in the multiple compartment system of pressurized water reactor (PWR) plants. 2 - Method of solution: SACHET utilizes a matrix of fission product core inventory which is previously calculated by the ORIGEN code. 3 - Restrictions on the complexity of the problem: Liquid wastes such as chemical waste and detergent waste are not included

  5. Pancreas and cyst segmentation

    Science.gov (United States)

    Dmitriev, Konstantin; Gutenko, Ievgeniia; Nadeem, Saad; Kaufman, Arie

    2016-03-01

    Accurate segmentation of abdominal organs from medical images is an essential part of surgical planning and computer-aided disease diagnosis. Many existing algorithms are specialized for the segmentation of healthy organs. Cystic pancreas segmentation is especially challenging due to its low contrast boundaries, variability in shape, location and the stage of the pancreatic cancer. We present a semi-automatic segmentation algorithm for pancreata with cysts. In contrast to existing automatic segmentation approaches for healthy pancreas segmentation which are amenable to atlas/statistical shape approaches, a pancreas with cysts can have even higher variability with respect to the shape of the pancreas due to the size and shape of the cyst(s). Hence, fine results are better attained with semi-automatic steerable approaches. We use a novel combination of random walker and region growing approaches to delineate the boundaries of the pancreas and cysts with respective best Dice coefficients of 85.1% and 86.7%, and respective best volumetric overlap errors of 26.0% and 23.5%. Results show that the proposed algorithm for pancreas and pancreatic cyst segmentation is accurate and stable.

  6. Validation of gadolinium burnout using PWR benchmark specification

    Energy Technology Data Exchange (ETDEWEB)

    Oettingen, Mikołaj, E-mail: moettin@agh.edu.pl; Cetnar, Jerzy, E-mail: cetnar@mail.ftj.agh.edu.pl

    2014-07-01

    Graphical abstract: - Highlights: • We present methodology for validation of gadolinium burnout in PWR. • We model 17 × 17 PWR fuel assembly using MCB code. • We demonstrate C/E ratios of measured and calculated concentrations of Gd isotopes. • The C/E for Gd154, Gd156, Gd157, Gd158 and Gd160 shows good agreement of ±10%. • The C/E for Gd152 and Gd155 shows poor agreement below ±10%. - Abstract: The paper presents comparative analysis of measured and calculated concentrations of gadolinium isotopes in spent nuclear fuel from the Japanese Ohi-2 PWR. The irradiation of the 17 × 17 fuel assembly containing pure uranium and gadolinia bearing fuel pins was numerically reconstructed using the Monte Carlo Continuous Energy Burnup Code – MCB. The reference concentrations of gadolinium isotopes were measured in early 1990s at Japan Atomic Energy Research Institute. It seems that the measured concentrations were never used for validation of gadolinium burnout. In our study we fill this gap and assess quality of both: applied numerical methodology and experimental data. Additionally we show time evolutions of infinite neutron multiplication factor K{sub inf}, FIMA burnup, U235 and Gd155–Gd158. Gadolinium-based materials are commonly used in thermal reactors as burnable absorbers due to large neutron absorption cross-section of Gd155 and Gd157.

  7. Acceptance test for 900 MWe PWR unit replacement steam generators

    International Nuclear Information System (INIS)

    Gourguechon, B.

    1993-01-01

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG's differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs

  8. Performance of high burned PWR fuel during transient

    International Nuclear Information System (INIS)

    Yanagisawa, Kazuaki; Fujishiro, Toshio

    1992-01-01

    In a majority of Japanese light water type commercial powder reactors (LWRs), UO 2 pellet sheathed by zircaloy cladding is used. Licensed discharged burn-up of the PWR fuel rod is going to be increased from 39 MWd/kgU to 48 MWd/kgU. This requests the increased reliability of cladding material as a strong barrier against fission product (FP). A long time usage in the neutron field and in the high temperature coolant will cause the zircaloy hardening and embrittlement. The cladding material is also degraded by waterside corrosion. These degradations are enhanced much by increased burn-up. A increased magnitude of the pellet-cladding mechanical interaction (PCMI) is of importance for increasing the stress of cladding material. In addition, aggressive FPs released from the fuel tends to attack the cladding material to cause stress corrosion cracking (SCC). At the Nuclear Safety Research Reactor (NSRR) in JAERI, 14 x 14 PWR type fuel rods preirradiation up to 42 MWd/kgU was prepared for the transient pulse irradiation under the simulated reactivity initiated accident (RIA) conditions. This will cause a prompt increase of the fuel temperature and stress on the highly burned cladding material. In the present paper, steady-state and transient behavior observed from the tested PWR fuel rod and calculational results obtained from the computer code FPRETAIN will be described. (author)

  9. Benchmarking Computational Fluid Dynamics for Application to PWR Fuel

    International Nuclear Information System (INIS)

    Smith, L.D. III; Conner, M.E.; Liu, B.; Dzodzo, B.; Paramonov, D.V.; Beasley, D.E.; Langford, H.M.; Holloway, M.V.

    2002-01-01

    The present study demonstrates a process used to develop confidence in Computational Fluid Dynamics (CFD) as a tool to investigate flow and temperature distributions in a PWR fuel bundle. The velocity and temperature fields produced by a mixing spacer grid of a PWR fuel assembly are quite complex. Before using CFD to evaluate these flow fields, a rigorous benchmarking effort should be performed to ensure that reasonable results are obtained. Westinghouse has developed a method to quantitatively benchmark CFD tools against data at conditions representative of the PWR. Several measurements in a 5 x 5 rod bundle were performed. Lateral flow-field testing employed visualization techniques and Particle Image Velocimetry (PIV). Heat transfer testing involved measurements of the single-phase heat transfer coefficient downstream of the spacer grid. These test results were used to compare with CFD predictions. Among the parameters optimized in the CFD models based on this comparison with data include computational mesh, turbulence model, and boundary conditions. As an outcome of this effort, a methodology was developed for CFD modeling that provides confidence in the numerical results. (authors)

  10. Decay ratio studies in BWR and PWR using wavelet

    International Nuclear Information System (INIS)

    Ciftcioglu, Oe.

    1996-10-01

    The on-line stability of BWR and PWR is studied using the neutron noise signals as the fluctuations reflect the dynamic characteristics of the reactor. Using appropriate signal modeling for time domain analysis of noise signals, the stability parameters can be directly obtained from the system impulse response. Here in particular for BWR, an important stability parameter is the decay ratio (DR) of the impulse response. The time series analysis involves the autoregressive modeling of the neutron detector signal. The DR determination is strongly effected by the low frequency behaviour since the transfer function characteristic tends to be a third order system rather than a second order system for a BWR. In a PWR low frequency behaviour is modified by the Boron concentration. As a result of these phenomena there are difficulties in the consistent determination of the DR oscillations. The enhancement of the consistency of this DR estimation is obtained by wavelet transform using actual power plant data from BWR and PWR. A comparative study of the Restimation with and without wavelets are presented. (orig.)

  11. Actinides transmutation - a comparison of results for PWR benchmark

    International Nuclear Information System (INIS)

    Claro, Luiz H.

    2009-01-01

    The physical aspects involved in the Partitioning and Transmutation (P and T) of minor actinides (MA) and fission products (FP) generated by reactors PWR are of great interest in the nuclear industry. Besides these the reduction in the storage of radioactive wastes are related with the acceptability of the nuclear electric power. From the several concepts for partitioning and transmutation suggested in literature, one of them involves PWR reactors to burn the fuel containing plutonium and minor actinides reprocessed of UO 2 used in previous stages. In this work are presented the results of the calculations of a benchmark in P and T carried with WIMSD5B program using its new cross sections library generated from the ENDF-B-VII and the comparison with the results published in literature by other calculations. For comparison, was used the benchmark transmutation concept based in a typical PWR cell and the analyzed results were the k∞ and the atomic density of the isotopes Np-239, Pu-241, Pu-242 and Am-242m, as function of burnup considering discharge of 50 GWd/tHM. (author)

  12. A scheme of better utilization of PWR spent fuels

    International Nuclear Information System (INIS)

    Chung, Bum Jin; Kang, Chang Soon

    1991-01-01

    The recycle of PWR spent fuels in a CANDU reactor, so called the tandem fuel cycle is investigated in this study. This scheme of utilizing PWR spent fuels will ease the shortage of spent fuel storage capacity as well as will improve the use of uranium resources. The minimum modification the design of present CANDU reactor is seeked in the recycle. Nine different fuel types are considered in this work and are classified into two categories: refabrication and reconfiguration. For refabrication, PWR spent fuels are processed and refabricated into the present 37 rod lattice structure of fuel bundle, and for reconfiguration, meanwhile, spent fuels are simply disassembled and rods are cut to fit into the present grid configuration of fuel bundle without refabrication. For each fuel option, the neutronics calculation of lattice was conducted to evaluate the allowable burn up and distribution. The fuel cycle cost of each option was also computed to assess the economic justification. The results show that most tandem fuel cycle option considered in this study are technically feasible as well as economically viable. (Author)

  13. Segmentation of consumer's markets and evaluation of market's segments

    OpenAIRE

    ŠVECOVÁ, Iveta

    2013-01-01

    The goal of this bachelor thesis was to explain a possibly segmentation of consumer´s markets for a chosen company, and to present a suitable goods offer, so it would be suitable to the needs of selected segments. The work is divided into theoretical and practical part. First part describes marketing, segmentation, segmentation of consumer's markets, consumer's market, market's segments a other terms. Second part describes an evaluation of questionnaire survey, discovering of market's segment...

  14. Study on virtual simulation technology for operation and control of PWR

    International Nuclear Information System (INIS)

    Fang Baoguo; Zhang Dafa; Lin Yajun

    2006-01-01

    The way to build graphical models of PWR with MultiGen Creator is discussed, and the three-dimensional model used in the virtual simulation is built. The mathematical simulation model for PWR based on the platform of MFC and Vega is built through the analysis of the mathematical simulation of PWR. The way to perform the virtual effect is introduced associating with the Pressurizer. And, all above parts are connected in one with VC++ to perform the whole virtual simulation of PWR. (authors)

  15. Alloy 690 in PWR type reactors; Aleaciones base niquel en condiciones de primario de los reactores tipo PWR

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Briceno, D.; Serrano, M.

    2005-07-01

    Alloy 690, used as replacement of Alloy 600 for vessel head penetration (VHP) nozzles in PWR, coexists in the primary loop with other components of Alloy 600. Alloy 690 shows an excellent resistance to primary water stress corrosion cracking, while Alloy 600 is very susceptible to this degradation mechanisms. This article analyse comparatively the PWSCC behaviour of both Ni-based alloys and associated weld metals 52/152 and 82/182. (Author)

  16. PSA LEVEL 3 DAN IMPLEMENTASINYA PADA KAJIAN KESELAMATAN PWR

    Directory of Open Access Journals (Sweden)

    Pande Made Udiyani

    2015-03-01

    Full Text Available Kajian keselamatan PLTN menggunakan metodologi kajian probabilistik sangat penting selain kajian deterministik. Metodologi kajian menggunakan Probabilistic Safety Assessment (PSA Level 3 diperlukan terutama untuk estimasi kecelakaan parah atau kecelakaan luar dasar desain PLTN. Metode ini banyak dilakukan setelah kejadian kecelakaan Fukushima. Dalam penelitian ini dilakukan implementasi PSA Level 3 pada kajian keselamatan PWR, postulasi kecelakan luar dasar desain PWR AP-1000 dan disimulasikan di contoh tapak Bangka Barat. Rangkaian perhitungan yang dilakukan adalah: menghitung suku sumber dari kegagalan teras yang terjadi, pemodelan kondisi meteorologi tapak dan lingkungan, pemodelan jalur paparan, analisis dispersi radionuklida dan transportasi fenomena di lingkungan, analisis deposisi radionuklida, analisis dosis radiasi, analisis perlindungan & mitigasi, dan analisis risiko. Kajian menggunakan rangkaian subsistem pada perangkat lunak PC Cosyma. Hasil penelitian membuktikan bahwa implementasi metode kajian keselamatan PSA Level 3 sangat efektif dan komprehensif terhadap estimasi dampak, konsekuensi, risiko, kesiapsiagaan kedaruratan nuklir (nuclear emergency preparedness, dan manajemen kecelakaan reaktor terutama untuk kecelakaan parah atau kecelakaan luar dasar desain PLTN. Hasil kajian dapat digunakan sebagai umpan balik untuk kajian keselamatan PSA Level 1 dan PSA Level 2. Kata kunci: PSA level 3, kecelakaan, PWR   Reactor safety assessment of nuclear power plants using probabilistic assessment methodology is most important in addition to the deterministic assessment. The methodology of Level 3 Probabilistic Safety Assessment (PSA is especially required to estimate severe accident or beyond design basis accidents of nuclear power plants. This method is carried out after the Fukushima accident. In this research, the postulations beyond design basis accidentsof PWR AP - 1000 would be taken, and simulated at West Bangka sample site. The

  17. Segmental tuberculosis verrucosa cutis

    Directory of Open Access Journals (Sweden)

    Hanumanthappa H

    1994-01-01

    Full Text Available A case of segmental Tuberculosis Verrucosa Cutis is reported in 10 year old boy. The condition was resembling the ascending lymphangitic type of sporotrichosis. The lesions cleared on treatment with INH 150 mg daily for 6 months.

  18. Chromosome condensation and segmentation

    International Nuclear Information System (INIS)

    Viegas-Pequignot, E.M.

    1981-01-01

    Some aspects of chromosome condensation in mammalians -humans especially- were studied by means of cytogenetic techniques of chromosome banding. Two further approaches were adopted: a study of normal condensation as early as prophase, and an analysis of chromosome segmentation induced by physical (temperature and γ-rays) or chemical agents (base analogues, antibiotics, ...) in order to show out the factors liable to affect condensation. Here 'segmentation' means an abnormal chromosome condensation appearing systematically and being reproducible. The study of normal condensation was made possible by the development of a technique based on cell synchronization by thymidine and giving prophasic and prometaphasic cells. Besides, the possibility of inducing R-banding segmentations on these cells by BrdU (5-bromodeoxyuridine) allowed a much finer analysis of karyotypes. Another technique was developed using 5-ACR (5-azacytidine), it allowed to induce a segmentation similar to the one obtained using BrdU and identify heterochromatic areas rich in G-C bases pairs [fr

  19. Delphi definition of the EADC-ADNI Harmonized Protocol for hippocampal segmentation on magnetic resonance

    NARCIS (Netherlands)

    Boccardi, M.; Bocchetta, M.; Apostolova, L.G.; Barnes, J.; Bartzokis, G.; Corbetta, G.; deCarli, C.; DeToledo-Morrell, L.; Firbank, M.; Ganzola, R.; Gerritsen, L.; Henneman, W.; Killiany, R.J.; Malykhin, N.; Pasqualetti, P.; Pruessner, J.C.; Redolfi, A.; Robitaille, N.; Soininen, H.; Tolomeo, D.; Wang, L.; Watson, C.; Wolf, H; Duvernoy, H.; Duchesne, S.; Jack, C.R.; Frisoni, G. B.

    2015-01-01

    Background: This study aimed to have international experts converge on a harmonized definition of whole hippocampus boundaries and segmentation procedures, to define standard operating procedures for magnetic resonance (MR)-based manual hippocampal segmentation. Methods: The panel received a

  20. Fluence map segmentation

    International Nuclear Information System (INIS)

    Rosenwald, J.-C.

    2008-01-01

    The lecture addressed the following topics: 'Interpreting' the fluence map; The sequencer; Reasons for difference between desired and actual fluence map; Principle of 'Step and Shoot' segmentation; Large number of solutions for given fluence map; Optimizing 'step and shoot' segmentation; The interdigitation constraint; Main algorithms; Conclusions on segmentation algorithms (static mode); Optimizing intensity levels and monitor units; Sliding window sequencing; Synchronization to avoid the tongue-and-groove effect; Accounting for physical characteristics of MLC; Importance of corrections for leaf transmission and offset; Accounting for MLC mechanical constraints; The 'complexity' factor; Incorporating the sequencing into optimization algorithm; Data transfer to the treatment machine; Interface between R and V and accelerator; and Conclusions on fluence map segmentation (Segmentation is part of the overall inverse planning procedure; 'Step and Shoot' and 'Dynamic' options are available for most TPS (depending on accelerator model; The segmentation phase tends to come into the optimization loop; The physical characteristics of the MLC have a large influence on final dose distribution; The IMRT plans (MU and relative dose distribution) must be carefully validated). (P.A.)

  1. Gamifying Video Object Segmentation.

    Science.gov (United States)

    Spampinato, Concetto; Palazzo, Simone; Giordano, Daniela

    2017-10-01

    Video object segmentation can be considered as one of the most challenging computer vision problems. Indeed, so far, no existing solution is able to effectively deal with the peculiarities of real-world videos, especially in cases of articulated motion and object occlusions; limitations that appear more evident when we compare the performance of automated methods with the human one. However, manually segmenting objects in videos is largely impractical as it requires a lot of time and concentration. To address this problem, in this paper we propose an interactive video object segmentation method, which exploits, on one hand, the capability of humans to identify correctly objects in visual scenes, and on the other hand, the collective human brainpower to solve challenging and large-scale tasks. In particular, our method relies on a game with a purpose to collect human inputs on object locations, followed by an accurate segmentation phase achieved by optimizing an energy function encoding spatial and temporal constraints between object regions as well as human-provided location priors. Performance analysis carried out on complex video benchmarks, and exploiting data provided by over 60 users, demonstrated that our method shows a better trade-off between annotation times and segmentation accuracy than interactive video annotation and automated video object segmentation approaches.

  2. Strategic market segmentation

    Directory of Open Access Journals (Sweden)

    Maričić Branko R.

    2015-01-01

    Full Text Available Strategic planning of marketing activities is the basis of business success in modern business environment. Customers are not homogenous in their preferences and expectations. Formulating an adequate marketing strategy, focused on realization of company's strategic objectives, requires segmented approach to the market that appreciates differences in expectations and preferences of customers. One of significant activities in strategic planning of marketing activities is market segmentation. Strategic planning imposes a need to plan marketing activities according to strategically important segments on the long term basis. At the same time, there is a need to revise and adapt marketing activities on the short term basis. There are number of criteria based on which market segmentation is performed. The paper will consider effectiveness and efficiency of different market segmentation criteria based on empirical research of customer expectations and preferences. The analysis will include traditional criteria and criteria based on behavioral model. The research implications will be analyzed from the perspective of selection of the most adequate market segmentation criteria in strategic planning of marketing activities.

  3. RCC-M: Design and construction rules for mechanical components of PWR nuclear islands

    International Nuclear Information System (INIS)

    2017-01-01

    AFCEN's RCC-M code concerns the mechanical components designed and manufactured for pressurized water reactors (PWR). It applies to pressure equipment in nuclear islands in safety classes 1, 2 and 3, and certain non-pressure components, such as vessel internals, supporting structures for safety class components, storage tanks and containment penetrations. RCC-M covers the following technical subjects: sizing and design, choice of materials and procurement. Fabrication and control, including: associated qualification requirements (procedures, welders and operators, etc.), control methods to be implemented, acceptance criteria for detected defects, documentation associated with the different activities covered, and quality assurance. The design, manufacture and inspection rules defined in RCC-M leverage the results of the research and development work pioneered in France, Europe and worldwide, and which have been successfully used by industry to design and build PWR nuclear islands. AFCEN's rules incorporate the resulting feedback. Use: France's last 16 nuclear units (P'4 and N4); 4 CP1 reactors in South Africa (2) and Korea (2); 44 M310 (4), CPR-1000 (28), CPR-600 (6), HPR-1000 (4) and EPR (2) reactors in service or undergoing construction in China; 4 EPR reactors in Europe: Finland (1), France (1) and UK (2). Content: Section I - nuclear island components, subsection 'A': general rules, subsection 'B': class 1 components, subsection 'C': class 2 components, subsection 'D': class 3 components, subsection 'E': small components, subsection 'G': core support structures, subsection 'H': supports, subsection 'J': low pressure or atmospheric storage tanks, subsection 'P': containment penetration, subsection 'Q': qualification of active mechanical components, subsection 'Z': technical appendices; section II - materials; section III - examination

  4. Design development of steel plate concrete modularization for the advanced PWR in Korea

    International Nuclear Information System (INIS)

    Mun, Taeyoup; Kim, Keunkyeong; Sun, Wonsang; Kim, Taeyoung; Hwang, Geunha

    2008-01-01

    APR1400 TM - an advanced PWR - has been developed in Korea since 1992. Four APR1400 units - Shin Kori no.3,4 and Shin Uljin no.1,2 - are going to be built in a next decade. As for economical efficiency, construction cost per power generation Unit(W) is improved more than 10% compared to the former 1,000 MWe PWRs. Moreover, life-cycle maintenance cost is reduced to the world's most level. For construction period from first concrete pouring to commercial operation, 54 months for APR1400 and 36 months for n-th unit have been projected. Reduction of the construction term of the Nuclear Power Plant has been emphasized increasingly for the NPP construction Project because it would reduce the interest cost and uncertainty of the project. The reduction can also advance the return of investment. Some of the PPM(Prefabrication, Preassembly, and Modularization) techniques have been studied for the shortening the construction period of nuclear power plant. Especially for the internal structure of reactor containment building (RCB) in PWR whose term of construction is critical to the whole project, Steel Plate Concrete(SC) structure has been studied as one of alternative structural systems to the conventional Reinforced Concrete(RC) structure in APR1400. SC structure is considered appropriate for the modularization of the structure with its self-supporting. In addition, formwork can be dramatically eliminated when SC structural modules are used. The MKE (Ministry of Knowledge Economy) and KHNP (Korea Hydro and Nuclear Power Co., Ltd.) initiated the research and development of SC Structure in 2005. This paper presents design examples along with Codes and Standards of SC structure in nuclear power plant. (author)

  5. A Hold-down Margin Assessment using Statistical Method for the PWR Fuel Assembly

    International Nuclear Information System (INIS)

    Jeon, S. Y.; Park, N. K.; Lee, K. S.; Kim, H. K.

    2007-01-01

    The hold-down springs provide an acceptable hold down force against hydraulic uplift force absorbing the length change of the fuel assembly relative to the space between the upper and lower core plates in PWR. These length changes are mainly due to the thermal expansion, irradiation growth and creep down of the fuel assemblies. There are two kinds of hold-down springs depending on the different design concept of the reactor internals of the PWR in Korea, one is a leaf-type hold down spring for Westinghouse type plants and the other is a coil-type hold-down spring for OPR1000 (Optimized Power Reactor 1000). There are four sets of hold-down springs in each fuel assembly for leaf type hold-down spring and each set of the hold-down springs consists of multiple tapered leaves to form a cantilever leaf spring set. The length, width and thickness of the spring leaves are selected to provide the desired spring constant, deflection range, and hold down force. There are four coil springs in each fuel assembly for coil-type hold-down spring. In this study, the hold-down forces and margins were calculated for the leaf-type and coil-type hold-down springs considering geometrical data of the fuel assembly and its components, length changes of the fuel assembly due to thermal expansion, irradiation growth, creep, and irradiation relaxation. The hold-down spring forces were calculated deterministically and statistically to investigate the benefit of the statistical calculation method in view of hold-down margin. The Monte-Carlo simulation method was used for the statistical hold down force calculation

  6. Segmented block copolymers with monodisperse aramide end-segments

    NARCIS (Netherlands)

    Araichimani, A.; Gaymans, R.J.

    2008-01-01

    Segmented block copolymers were synthesized using monodisperse diaramide (TT) as hard segments and PTMO with a molecular weight of 2 900 g · mol-1 as soft segments. The aramide: PTMO segment ratio was increased from 1:1 to 2:1 thereby changing the structure from a high molecular weight multi-block

  7. Lower internals for pressurized water reactor

    International Nuclear Information System (INIS)

    Chevereau, G.; Babin, M.

    1989-01-01

    The lower internals for PWR has a separating plate mounted beneath its lower core plate and defining a distribution chamber with it, peripheral mechanical connectors joining the plates separated by coolant passage and apertures in the separation plate connected to a coolant pipe [fr

  8. Rediscovering market segmentation.

    Science.gov (United States)

    Yankelovich, Daniel; Meer, David

    2006-02-01

    In 1964, Daniel Yankelovich introduced in the pages of HBR the concept of nondemographic segmentation, by which he meant the classification of consumers according to criteria other than age, residence, income, and such. The predictive power of marketing studies based on demographics was no longer strong enough to serve as a basis for marketing strategy, he argued. Buying patterns had become far better guides to consumers' future purchases. In addition, properly constructed nondemographic segmentations could help companies determine which products to develop, which distribution channels to sell them in, how much to charge for them, and how to advertise them. But more than 40 years later, nondemographic segmentation has become just as unenlightening as demographic segmentation had been. Today, the technique is used almost exclusively to fulfill the needs of advertising, which it serves mainly by populating commercials with characters that viewers can identify with. It is true that psychographic types like "High-Tech Harry" and "Joe Six-Pack" may capture some truth about real people's lifestyles, attitudes, self-image, and aspirations. But they are no better than demographics at predicting purchase behavior. Thus they give corporate decision makers very little idea of how to keep customers or capture new ones. Now, Daniel Yankelovich returns to these pages, with consultant David Meer, to argue the case for a broad view of nondemographic segmentation. They describe the elements of a smart segmentation strategy, explaining how segmentations meant to strengthen brand identity differ from those capable of telling a company which markets it should enter and what goods to make. And they introduce their "gravity of decision spectrum", a tool that focuses on the form of consumer behavior that should be of the greatest interest to marketers--the importance that consumers place on a product or product category.

  9. PWR pressure vessel integrity during overcooling accidents

    International Nuclear Information System (INIS)

    Cheverton, R.D.

    1981-01-01

    Pressurized water reactors are susceptible to certain types of hypothetical accidents that under some circumstances, including operation of the reactor beyond a critical time in its life, could result in failure of the pressure vessel as a result of propagation of crack-like defects in the vessel wall. The accidents of concern are those that result in thermal shock to the vessel while the vessel is subjected to internal pressure. Such accidents, referred to as pressurized thermal shock or overcooling accidents (OCA), include a steamline break, small-break LOCA, turbine trip followed by stuck-open bypass valves, the 1978 Rancho Seco and the TMI accidents and many other postulated and actual accidents. The source of cold water for the thermal shock is either emergency core coolant or the normal primary-system coolant. ORNL performed fracture-mechanics calculations for a steamline break in 1978 and for a turbine-trip case in 1980 and concluded on the basis of the results that many more such calculations would be required. To meet the expected demand in a realistic way a computer code, OCA-I, was developed that accepts primary-system temperature and pressure transients as input and then performs one-dimensional thermal and stress analyses for the wall and a corresponding fracture-mechanics analysis for a long axial flaw. The code is briefly described, and its use in both generic and specific plant analyses is discussed

  10. Scorpion image segmentation system

    Science.gov (United States)

    Joseph, E.; Aibinu, A. M.; Sadiq, B. A.; Bello Salau, H.; Salami, M. J. E.

    2013-12-01

    Death as a result of scorpion sting has been a major public health problem in developing countries. Despite the high rate of death as a result of scorpion sting, little report exists in literature of intelligent device and system for automatic detection of scorpion. This paper proposed a digital image processing approach based on the floresencing characteristics of Scorpion under Ultra-violet (UV) light for automatic detection and identification of scorpion. The acquired UV-based images undergo pre-processing to equalize uneven illumination and colour space channel separation. The extracted channels are then segmented into two non-overlapping classes. It has been observed that simple thresholding of the green channel of the acquired RGB UV-based image is sufficient for segmenting Scorpion from other background components in the acquired image. Two approaches to image segmentation have also been proposed in this work, namely, the simple average segmentation technique and K-means image segmentation. The proposed algorithm has been tested on over 40 UV scorpion images obtained from different part of the world and results obtained show an average accuracy of 97.7% in correctly classifying the pixel into two non-overlapping clusters. The proposed 1system will eliminate the problem associated with some of the existing manual approaches presently in use for scorpion detection.

  11. Safety aspects of the using Gd as burnable poison in PWR's

    International Nuclear Information System (INIS)

    Vandenberg, C.; Bonet, H.; Charlier, A.

    1978-01-01

    The experience of BELGONUCLEAIRE in using Gd in LWR's has indicated the safety related advantages of this burnable poison. The successfully operation of the BR3 PWR power plant with 5% of Gd rods is presented and extrapolated to large PWR's. (authro)

  12. Application of willis covered stent in the treatment of aneurysms located in the cisternal segment of the internal carotid artery: a pilot comparative study with long-term follow-up results

    International Nuclear Information System (INIS)

    Zhu Yueqi; Li Minghua; Fang Chun; Wang Wu; Zhang Peilei; Cheng Yingsheng; Tan Huaqiao; Wang Jianbo

    2010-01-01

    Objective: Complicated aneurysms located in the cisternal segment of the internal carotid artery(ICA-CSA) present unique therapeutic difficulties. This study is to discuss the feasibility of the Willis stent-graft in treating complicated ICA-CSA by comparing its effect with that of coiling therapy. Methods: Willis covered stents were employed in 19 complicated ICA-CSAs (group A), while coils were used in 17 complicated ICA-CSAs (group B). Follow-up angiography was performed to investigate aneurysm recurrence, endoleak and parent artery (PA) stenosis. Kaplan-Meier curves were constructed to compare the recurrence-free and PA stenosis-free rate in both groups. Results: Total exclusion was immediately achieved in 13 ICA-CSAs and minor endoleaks presented in 5 cases in group A. Total or near-total occlusion was achieved in 7 ICA-CSAs, subtotal occlusion in 8 and partial occlusion in 2 cases in group B after coiling. Acute thrombosis occurred in 1 patient in either group and re-hemorrhage happened in 1 patient after coiling. Follow-up angiography in group A revealed that 16 ICA-CSAs were completely isolated, with two parent arteries showing mild in-stent stenosis. Eighteen months after the procedure, Kaplan-Meier analysis showed that the recurrence-free rate was 93.3% and 50%, while the stenosis-free rate of parent artery was 87.5% and 100% in group A and in Group B, respectively. In group A and group Bthe clinical neurological symptoms were fully recovered in 9 and 9, obviously improved in 3 and 5, unchanged in 2 and 2, and aggravated in one and 0 patients, respectively. Conclusion: The implantation of Willis stent-graft is a feasible endovascular therapy for complicated ICA-CSAs. When the parent artery is very tortuous or when the risk that a main collateral branch may be wrongly covered and occluded is present, the implantation of Willis covered stent can not be taken as the treatment of first choice. (authors)

  13. MOX and UOX PWR fuel performances EDF operating experience

    International Nuclear Information System (INIS)

    Provost, Jean-Luc; Debes, Michel

    2005-01-01

    Based on a large program of experimentations implemented during the 90s, the industrial achievement of new FAs designs with increased performances opens up new prospects. The currently UOX fuels used on the 58 EDF PWR units are now authorized up to a maximum FA burn-up of 52 GWd/t with a large experience from 45 to 50 GWd/t. Today, the new products, along with the progress made in the field of calculation methods, still enable to increase further the fuel performances with respect to the safety margins. Thus, the conditions are met to implement in the next years new fuel managements on each NPPs series of the EDF fleet with increased enrichment (up to 4.5%) and irradiation limits (up to 62 GWd/t). The recycling of plutonium is part of EDF's reprocessing/recycling strategy. Up to now, 20 PWR 900 MW reactors are managed in MOX hybrid management. The feedback experience of 18 years of PWR operation with MOX is satisfactory, without any specific problem regarding manoeuvrability or plant availability. EDF is now looking to introduce MOX fuels with a higher plutonium content (up to 8.6%) equivalent to natural uranium enriched to 3.7%. It is the goal of the MOX Parity core management which achieve balance of MOX and UOX fuel performance with a significant increase of the MOX average discharge burn-up (BU max: 52 GWd/t for MOX and UOX). The industrial maturity of new FAs designs, with increased performances, allows the implementation in the next years of new fuel managements on each NPPs series of the EDF fleet. The scheduling of the implementation of the new fuel managements on the PWRs fleet is a great challenge for EDF, with important stakes: the nuclear KWh cost decrease with the improvement of the plant operation performance. (author)

  14. Integral type small PWR with stand-alone safety

    International Nuclear Information System (INIS)

    Makihara, Yoshiaki

    2001-01-01

    A feasibility study is achieved on an integral type small PWR with stand-alone safety. It is designed to have the following features. (1) The coolant does not leak out at any accidental condition. (2) The fuel failure does never occur while it is supposed on the large scale PWR at the design base accident. (3) At any accidental condition the safety is secured without any support from the outside (stand-alone safety secure). (4) It has self-regulating characteristics and easy controllability. The above features can be satisfied by integrate the steam generator and CRDM in the reactor vessel while the pipe line break has to be considered on the conventional PWR. Several counter measures are planned to satisfy the above features. The economy feature is also attained by several simplifications such as (1) elimination of main coolant piping and pressurizer by the integration of primary cooling system and self-pressurizing, (2) elimination of RCP by application of natural circulating system, (3) elimination of ECCS and accumulator by application of static safety system, (4) large scale volume reduction of the container vessel by application of integrated primary cooling system, (5) elimination of boric acid treatment by deletion of chemical shim. The long operation period such as 10 years can be attained by the application of Gd fuel in one batch refueling. The construction period can be shortened by the standardizing the design and the introduction of modular component system. Furthermore the applicability of the reduced modulation core is also considered. (K. Tsuchihashi)

  15. Plutonium recycle in PWR reactors (Brazilian Nuclear Program)

    International Nuclear Information System (INIS)

    Rubini, L.A.

    1978-02-01

    An evaluation is made of the material requirements of the nuclear fuel cycle with plutonium recycle. It starts from the calculation of a reference reactor and allows the evaluation of demand under two alternatives of nuclear fuel cycle for Pressurized Water Reactors (PWR): without plutonium recycle; and with plutonium recycle. Calculations of the reference reactor have been carried out with the CELL-CORE codes. For plutonium recycle, the concept of uranium and plutonium homogeneous mixture has been adopted, using self-produced plutonium at equilibrium, in order to get minimum neutronic perturbations in the reactor core. The refueling model studied in the reference reactor was the 'out-in' scheme with a constant number of changed fuel elements (approximately 1/3 of the core). Variations in the material requirements were studied considering changes in the installed nuclear capacity of PWR reactors, the capacity factor of these reactors, and the introduction of fast breeders. Recycling plutonium produced inside the system can reach economies of about 5%U 3 O 8 and 6% separative work units if recycle is assumed only after the 5th operation cycle of the thermal reactors. The cumulative amount of fissile plutonium obtained by the Brazilian Nuclear Program of PWR reactors by 1991 should be sufficient for a fast breeder with the same capacity as Angra 2. For the proposed fast breeder programs, the fissile plutonium produced by thermal reactors is sufficient to supply fast breeder initial necessities. Howewer, U 3 O 8 and SWU economy with recycle is not significant when the proposed fast breeder program is considered. (Author) [pt

  16. BWR and PWR chemistry operating experience and perspectives

    International Nuclear Information System (INIS)

    Fruzzetti, K.; Garcia, S.; Lynch, N.; Reid, R.

    2014-01-01

    It is well recognized that proper control of water chemistry plays a critical role in ensuring the safe and reliable operation of Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs). State-of-the-art water chemistry programs reduce general and localized corrosion of reactor coolant system, steam cycle equipment, and fuel cladding materials; ensure continued integrity of cycle components; and reduce radiation fields. Once a particular nuclear plant component has been installed or plant system constructed, proper water chemistry provides a global tool to mitigate materials degradation problems, thereby reducing the need for costly repairs or replacements. Recognizing the importance of proper chemistry control and the value in understanding the relationship between chemistry guidance and actual operating experience, EPRI continues to collect, monitor, and evaluate operating data from BWRs and PWRs around the world. More than 900 cycles of valuable BWR and PWR operating chemistry data has been collected, including online, startup and shutdown chemistry data over more than 10 years (> 20 years for BWRs). This paper will provide an overview of current trends in BWR and PWR chemistry, focusing on plants in the U.S.. Important chemistry parameters will be highlighted and discussed in the context of the EPRI Water Chemistry Guidelines requirements (i.e., those parameters considered to be of key importance as related to the major goals identified in the EPRI Guidelines: materials integrity; fuel integrity; and minimizing plant radiation fields). Perspectives will be provided in light of recent industry initiatives and changes in the EPRI BWR and PWR Water Chemistry Guidelines. (author)

  17. PREP-PWR-1.0: a WIMS-D/4 pre-processor code for the generation of data for PWR fuel assemblies

    International Nuclear Information System (INIS)

    Ball, G.

    1991-06-01

    The PREP-PWR-1.0 computer code is a substantially modified version of the PREWIM code which formed part of the original MARIA System (Report J.E.N. 543). PREP-PWR-1.0 is a comprehensive pre-processor code which generates input data for the WIMS-D/4.1 code (Report PEL 294) for PWR fuel assemblies, with or without control and burnable poison rods. This data is generated at various base and off-base conditions. The overall cross section generation methodology is described, followed by a brief overview of the model. Aspects of the base/off-base calculational scheme are outlined. Additional features of the code are described while the input data format of PREP-PWR-1.0 is listed. The sample problems and suggestions for further improvements to the code are also described. 2 figs., 2 tabs., 12 refs

  18. Segmentation of complex document

    Directory of Open Access Journals (Sweden)

    Souad Oudjemia

    2014-06-01

    Full Text Available In this paper we present a method for segmentation of documents image with complex structure. This technique based on GLCM (Grey Level Co-occurrence Matrix used to segment this type of document in three regions namely, 'graphics', 'background' and 'text'. Very briefly, this method is to divide the document image, in block size chosen after a series of tests and then applying the co-occurrence matrix to each block in order to extract five textural parameters which are energy, entropy, the sum entropy, difference entropy and standard deviation. These parameters are then used to classify the image into three regions using the k-means algorithm; the last step of segmentation is obtained by grouping connected pixels. Two performance measurements are performed for both graphics and text zones; we have obtained a classification rate of 98.3% and a Misclassification rate of 1.79%.

  19. Vertical Drop Of 21-PWR Waste Package On Unyielding Surface

    International Nuclear Information System (INIS)

    S. Mastilovic; A. Scheider; S.M. Bennett

    2001-01-01

    The objective of this calculation is to determine the structural response of a 21-PWR (pressurized-water reactor) Waste Package (WP) subjected to the 2-m vertical drop on an unyielding surface at three different temperatures. The scope of this calculation is limited to reporting the calculation results in terms of stress intensities in two different WP components. The information provided by the sketches (Attachment I) is that of the potential design of the type of WP considered in this calculation, and all obtained results are valid for that design only

  20. Development of laser weld monitoring system for PWR space grid

    International Nuclear Information System (INIS)

    Chung, Chin Man; Kim, Cheol Jung; Kim, Min Suk

    1998-06-01

    The laser welding monitoring system was developed to inspect PWR space grid welding for KNFC. The demands for this optical monitoring system were applied to Q.C. and process control in space grid welding. The thermal radiation signal from weld pool can be get the variation of weld pool size. The weld pool size and depth are verified by analyzed wavelength signals from weld pool. Applied this monitoring system in space grid weld, improved the weld productivity. (author). 4 refs., 5 tabs., 31 figs

  1. Friends of the Earth case against the PWR

    International Nuclear Information System (INIS)

    Boyle, S.

    1987-01-01

    Friends of the Earth's case against Sizewell B has been summarised in a report entitled 'Critical Decision: Should Britain buy the Pressurised Water Reactor?'. This showed that on economic and safety grounds, Sizewell B would not be a good choice for the electricity consumer or the country at large. Events since the end of the Inquiry, particularly those affecting the economic case, have confirmed this conclusion. This paper will summarise the case, both during the Inquiry and subsequent to this, as well as make reference to the long-term environmental implications of the Central Electricity Generating Board's PWR programme. (author)

  2. Optimization of control area ventilation systems for Japanese PWR plants

    International Nuclear Information System (INIS)

    Naitoh, T.; Nakahara, Y.

    1987-01-01

    The nuclear power plant has been required to reduce the cost for the purpose of making the low-cost energy since several years ago in Japan. The Heating, Ventilating and Air Conditioning system in the nuclear power plant has been also required to reduce its cost. On the other hand the ventilation system should add the improvable function according to the advanced plant design. In response to these different requirements, the ventilation criteria and the design of the ventilation system have been evaluated and optimized in Japanese PWR Plant design. This paper presents the findings of the authors' study

  3. Explicit treatment of spectral history effects in PWR design

    International Nuclear Information System (INIS)

    Gavin, P.H.

    1995-01-01

    Spectral history effects in pressurized water reactors (PWRs) are a consequence of spatially distributed and/or time-dependent quantities such as power, moderator temperature, soluble boron concentration, control rod position, etc., defining open-quotes operating conditions.close quotes Operating conditions, global and local, affect neutron spectrum and isotopic reaction rates and thus the evolution of the fuel composition. Any effect that hardens the neutron spectrum, such as elevated temperature or high soluble boron concentration, will increase the fuel conversion ratio and result in more reactive fuel. This paper describes history effects for an 18-month equilibruim cycle of an ABB CE system 80 PWR

  4. Model for calculating the boron concentration in PWR type reactors

    International Nuclear Information System (INIS)

    Reis Martins Junior, L.L. dos; Vanni, E.A.

    1986-01-01

    A PWR boron concentration model has been developed for use with RETRAN code. The concentration model calculates the boron mass balance in the primary circuit as the injected boron mixes and is transported through the same circuit. RETRAN control blocks are used to calculate the boron concentration in fluid volumes during steady-state and transient conditions. The boron reactivity worth is obtained from the core concentration and used in RETRAN point kinetics model. A FSAR type analysis of a Steam Line Break Accident in Angra I plant was selected to test the model and the results obtained indicate a sucessfull performance. (Author) [pt

  5. Fine numerical modelling of thermohydraulic phenomena in EDF PWR reactors

    International Nuclear Information System (INIS)

    Boulot, F.

    1993-01-01

    Over the last 20 years, EDF has developed a family of 2D and 3D industrial thermohydraulics software to solve problems encountered in existing PWR power plants and to design new reactors for the future. The equations used in the models are the averaged Navier-Stokes and energy equations. A brief description is given of the four main codes developed for single-phase and two-phase water-steam flows, some of which use finite differences or finite volumes methods, while others make use of finite elements methods. An example of application is given for each code. (author). 4 figs., 4 refs

  6. Sizewell B - analysis of British application of US PWR technology

    International Nuclear Information System (INIS)

    1983-05-01

    This report provides information on the staff's evaluation of major design differences and issues developed by the British in their application (Sizewell B) of US PWR technology. One design change, the addition of steam-driven charging pumps, was assessed to have a relatively high value compared to the other changes. However, the assessment is based on a number of assumptions for which inadequate data exist to make an unqualified judgment. Other changes to the US design (as typified by the SNUPPS design) were found to have relatively low or moderate safety benefits for US application

  7. Axial gap formation in P.W.R. fuel pins

    International Nuclear Information System (INIS)

    Roberts, G.; Jones, K.W.

    1978-07-01

    The potential mechanisms of axial gap formation in PWR fuel pins are examined analytically and also using evidence from post-irradiation examination (p.i.e.) investigation. It is concluded that fuel and cladding cannot remain in contact during densification and so the settling of of the fuel stack, which forms the gaps, must be prevented by such things as asperities in the cladding, fuel chips or tilted pellets. Examples from the p.i.e. examination programme are used to support this conclusion. (author)

  8. Fatigue crack growth analysis of a 450 PWR - lateral

    International Nuclear Information System (INIS)

    Taupin, P.; Flamand, F.

    1988-01-01

    Fatigue Crack Growth analysis of a 5 mm deep surface crack in the crotch region of a 45 0 Lateral (12 inch diameter) was performed on a 3-Loop 900 MWe PWR Plant under Normal and upset loading conditions. Stress Intensity factors were computed using the weight-function technique. The latter were obtained for a polynomial stress distribution at the corner of the lateral under contract with the Pressure Vessel Research Committee of the WRC. The study shows that after 40 years of normal operation the size of the end of life crack is limited to about 25 mm for the chosen lateral with a thickness of 300 mm

  9. A study on thimble plug removal for PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dong Soo; Lee, Chang Sup; Lee, Jae Yong; Jun, Hwang Yong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The thermal-hydraulic effects of removing the RCC guide thimble plugs are evaluated for 8 Westinghouse type PWR plants in Korea as a part of feasibility study: core outlet loss coefficient, thimble bypass flow, and best estimate flow. It is resulted that the best estimate thimble bypass flow increases about by 2% and the best estimate flow increases approximately by 1.2%. The resulting DNBR penalties can be covered with the current DNBR margin. Accident analyses are also investigated that the dropped rod transient is shown to be limiting and relatively sensitive to bypass flow variation. 8 refs., 5 tabs. (Author)

  10. PWR core follow calculations using the ELCOS code system

    International Nuclear Information System (INIS)

    Grimm, P.; Paratte, J.M.

    1990-01-01

    The ELCOS code system developed at PSI is used to simulate a cycle of a PWR in which one fifth of the assemblies are MOX fuel. The reactor and the calculational methods are briefly described. The calculated critical boron concentrations and power distributions are compared with the measurements at the plant. Although the critical boron concentration is somewhat overpredicted and the computed power distributions are slightly flatter than the measured ones the results of the calculations agree generally well with the measured data. (author) 1 tab., 8 figs., 6 refs

  11. A study on thimble plug removal for PWR plants

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dong Soo; Lee, Chang Sup; Lee, Jae Yong; Jun, Hwang Yong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    The thermal-hydraulic effects of removing the RCC guide thimble plugs are evaluated for 8 Westinghouse type PWR plants in Korea as a part of feasibility study: core outlet loss coefficient, thimble bypass flow, and best estimate flow. It is resulted that the best estimate thimble bypass flow increases about by 2% and the best estimate flow increases approximately by 1.2%. The resulting DNBR penalties can be covered with the current DNBR margin. Accident analyses are also investigated that the dropped rod transient is shown to be limiting and relatively sensitive to bypass flow variation. 8 refs., 5 tabs. (Author)

  12. Estimating probable flaw distributions in PWR steam generator tubes

    International Nuclear Information System (INIS)

    Gorman, J.A.; Turner, A.P.L.

    1997-01-01

    This paper describes methods for estimating the number and size distributions of flaws of various types in PWR steam generator tubes. These estimates are needed when calculating the probable primary to secondary leakage through steam generator tubes under postulated accidents such as severe core accidents and steam line breaks. The paper describes methods for two types of predictions: (1) the numbers of tubes with detectable flaws of various types as a function of time, and (2) the distributions in size of these flaws. Results are provided for hypothetical severely affected, moderately affected and lightly affected units. Discussion is provided regarding uncertainties and assumptions in the data and analyses

  13. Modelling of pellet-cladding interaction in PWR's

    International Nuclear Information System (INIS)

    Esteves, A.M.; Silva, A.T. e.

    1992-01-01

    The pellet-cladding interaction that can occur in a PWR fuel rod design is modelled with the computer codes FRAPCON-1 and ANSYS. The fuel performance code FRAPCON-1 analyses the fuel rod irradiation behavior and generates the initial conditions for the localized fuel rod thermal and mechanical modelling in two and three-dimensional finite elements with ANSYS. In the mechanical modelling, a pellet fragment is placed in the fuel rod gap. Two types of fuel rod cladding materials are considered: Zircaloy and austenitic stainless steel. (author)

  14. Study of the noise propagation in PWR with coupled codes

    International Nuclear Information System (INIS)

    Verdu, G.; Garcia-Fenoll, M.; Abarca, A.; Miro, R.; Barrachina, T.

    2011-01-01

    The in-core detectors provide signals of the power distribution monitoring for the Reactor Protection System (RPS). The advanced fuel management strategies (high exposure) and the power upratings for PWR reactor types have led to an increase in the noise amplitude in detectors signals. In the present work a study of the propagation along the reactor core and the effects on the core power evolution of a small perturbation on the moderator density, using the coupled code RELAP5-MOD3.3/PARCSv2.7 is presented. The purpose of these studies is to be able to reproduce and analyze the in-core detector simulated signals. (author)

  15. Thermal-hydraulic analysis of PWR cores in transient condition

    International Nuclear Information System (INIS)

    Silva Galetti, M.R. da.

    1984-01-01

    A calculational methodology for thermal - hydraulic analysis of PWR cores under steady-state and transient condition was selected and made available to users. An evaluation of the COBRA-IIIP/MIT code, used for subchannel analysis, was done through comparison of the code results with experimental data on steady state and transient conditions. As a result, a comparison study allowing spatial and temporal localization of critical heat flux was obtained. A sensitivity study of the simulation model to variations in some empirically determined parameter is also presented. Two transient cases from Angra I FSAR were analysed, showing the evolution of minimum DNBR with time. (Author) [pt

  16. Natural-circulation-cooling characteristics during PWR accident simulations

    International Nuclear Information System (INIS)

    Adams, J.P.; McCreery, G.E.; Berta, V.T.

    1983-01-01

    A description of natural circulation cooling characteristics is presented. Data were obtained from several pressurized water reactor accident simulations in the Loss-of-Fluid Test (LOFT) pressurized water reactor (PWR). The reliability of natural circulation cooling, its cooling effectiveness, and the effect of changing system conditions are described. Quantitative comparison of flow rates and time constants with theory for both single- and two-phase fluid conditions were made. It is concluded that natural circulation cooling can be relied on in plant recovery procedures in the absence of forced convection whenever the steam generator heat sink is available

  17. Life management plants at nuclear power plants PWR

    International Nuclear Information System (INIS)

    Esteban, G.

    2014-01-01

    Since in 2009 the CSN published the Safety Instruction IS-22 (1) which established the regulatory framework the Spanish nuclear power plants must meet in regard to Life Management, most of Spanish nuclear plants began a process of convergence of their Life Management Plants to practice 10 CFR 54 (2), which is the current standard of Spanish nuclear industry for Ageing Management, either during the design lifetime of the plant, as well as for Long-Term Operation. This article describe how Life Management Plans are being implemented in Spanish PWR NPP. (Author)

  18. Recent progress in SG level control in French PWR plants

    International Nuclear Information System (INIS)

    Parry, A.; Petetrot, J.F.; Vivier, M.J.

    1985-10-01

    Controlling the steam generator (SG) level is of major importance in a large PWR plant. This has led to extensive work on SG computer models. This paper presents results of the comparison between calculations and tests on the first four-loop plant in France. Four-loop plants started up after 1985 will be equipped with digital instead of analog controllers. A new SG level control has been designed and then optimised using the validated SG model. A prototype of this new system has been successfully tested on a three-loop plant. 4 refs

  19. Conversion ratio in epithermal PWR, in thorium and uranium cycle

    International Nuclear Information System (INIS)

    Barroso, D.E.G.

    1982-01-01

    Results obtained for the conversion ratio in PWR reactors with close lattices, operating in thorium and uranium cycles, are presented. The study of those reactors is done in an unitary fuel cell of the lattices with several ratios V sub(M)/V sub(F), considering only the equilibrium cycles and adopting a non-spatial depletion calculation model, aiming to simulate mass flux of reactor heavy elements in the reactor. The neutronic analysis and the cross sections generation are done with Hammer computer code, with one critical apreciation about the application of this code in epithermal systems and with modifications introduced in the library of basic data. (E.G.) [pt

  20. Conversion ratio and consumption of fissile material in PWR reactors

    International Nuclear Information System (INIS)

    Tiba, C.

    1977-01-01

    It has been shown that the uranium resources will be insufficient for future projected demand. The many solutions to this problem are considered and, in particular, the effect of enrichment on the conversion ratio and hence total uranium comsumption is studied. The developed computacional method employs the one-group neutron diffusion theory. The model is verified by calculating typical burn-up, conversion ratio, U-235 comsumption and plutonium production values in PWR's, and comparing results with those in the published literature. The associated costs of U and U-Pu fuel cycles are also studied for various enrichment values [pt

  1. Comparison of PWR-IMF and FR fuel cycles

    International Nuclear Information System (INIS)

    Darilek, Petr; Zajac, Radoslav; Breza, Juraj; Necas, Vladimir

    2007-01-01

    The paper gives a comparison of PWR (Russia origin VVER-440) cycle with improved micro-heterogeneous inert matrix fuel assemblies and FR cycle. Micro-heterogeneous combined assembly contains transmutation pins with Pu and MAs from burned uranium reprocessing and standard uranium pins. Cycle analyses were performed by HELIOS spectral code and SCALE code system. Comparison is based on fuel cycle indicators, used in the project RED-IMPACT - part of EU FP6. Advantages of both closed cycles are pointed out. (authors)

  2. For sale: 7 AGR stations and a brand new PWR

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Britain's seven AGR stations and the Sizewell B PWR will pass to private ownership under the UK government's plan to privatise the two nuclear generators, Nuclear Electric and Scottish Nuclear, sometime next year. Under the new set-up, the two generators will become operating subsidiaries of a holding company which will be headquartered in Scotland. The companies' ageing Magnox gas-cooled reactors will remain in a separate public sector company before being transferred to British Nuclear Fuels (BNFL) at the time of privatisation. (author)

  3. Underwater welding and repair technologies applied in PWR environment

    International Nuclear Information System (INIS)

    Scandella, Fabrice; Carpreau, Jean-Michel

    2012-01-01

    The authors describe several welding processes and technologies which have been used for underwater applications and which can be applied when repairing components of a PWR type reactor. They address, describe and discuss wet arc welding processes, the peculiarities of underwater welding, and the use of various processes such as 111, 114 and 135 processes, underwater welding with the hybrid plasma MIG-MAG process, underwater welding with the laser wire process, underwater welding with the FSW, FSP or UWFSW processes, underwater welding with variants of the friction welding process (friction surfacing, taper stitch welding, hydro-pillar processing

  4. Improvement in PWR flexibility the french program 1975-1995

    International Nuclear Information System (INIS)

    Gautier, A.; Miossec, C.

    1985-12-01

    Between 1975 and 1985, a substantial effort was launched in France to greatly improve PWR's flexibility, resulting in the current situation where both frequency control and load follow are now routinely performed on most plants in operation. Based on rapidly accumulating operational experience and on all expertise acquired in the past decade, a second-generation core control strategy is now being finalized for application on all future 1400 MW plants (with commercial operation scheduled in 1992 for first unit). This 20-year program is discussed

  5. Chemical cleaning of PWR steam generators: application at Nogent 1

    International Nuclear Information System (INIS)

    Fiquet, J.M.; Veysset, J.P.; Esteban, L.; Saurin, P.

    1990-01-01

    EDF has developed and patented a chemical cleaning process for PWR steam generators, based on the use of a mixture of organic acids in order to: - dissolve iron oxides and copper with a single solution; - clean dented crevices. Qualification tests have permitted to demonstrate effectiveness of the solution and its inocuousness related to steam generator materials. The process, the license of which belongs to SOMAFER R.A. and FRAMATOME, has been implemented in France at Nogent. The goal was to dissolve iron oxides allowing metallic particles, aggregated on the tubesheet, to be released and mechanically removed. The effectiveness was satisfactory and this treatment is to be extended to other units [fr

  6. Transfer of chemicals in PWR systems: secondary side

    International Nuclear Information System (INIS)

    Jonas, O.

    1978-01-01

    Transfer of chemicals in the secondary side of pressurized water reactor systems with recirculating and once-through steam generators is considered. Chemical data on water, steam and deposit chemistry of twenty-six operating units are given and major physical-chemical processes and differences between the two systems and between fossil and PWR systems are discussed. It is concluded that the limited available data show the average water and steam chemistry to be within recommended limits, but large variations of impurity concentrations and corrosion problems encountered indicate that our knowledge of the system chemistry and chemical thermodynamics, system design, sampling, analysis and operation need improvement. (author)

  7. Condensate polisher application for PWR steam generator corrosion control

    International Nuclear Information System (INIS)

    Sawochka, S.G.; Leibovitz, J.; Siegwarth, D.P.; Pearl, W.L.

    1981-01-01

    The evolution of corrosion attack modes particularly in recirculating U-tube PWR steam generators has dictated a thorough review of the advantages and disadvantages of condensate polishing. Analytical modeling techniques to qualitatively predict crevice chemistry variations resulting from steam generator bulk water variations have allowed valuable insights to be developed. Modeling results complemented by steam generator and laboratory corrosion data will be employed to set condensate demineralizer effluent specifications consistent with control of steam generator corrosion. Laboratory and plant studies are being performed to demonstrate achievability of necessary effluent specifications. (author)

  8. The N4 plant: culmination of French PWR experience

    International Nuclear Information System (INIS)

    Bellet, J.; Houyez, A.; Journet, J.; Pierrard, J.H.

    1985-01-01

    The model N4 series of 1400MWe class PWR plants has been developed in France from a unique base of technical and operating experience. It meets the French government's requirement for a reactor free of constraints due to licensing agreements with overseas companies, with enhanced safety features and incorporating the lessons of Three Mile Island. In particular, improvements have been made to the reactor vessel, the steam generators, the primary pumps and control systems. The units are capable of daily load following and extended operation between refuelling. The N4 plant includes a new design of turbine-generator. (author)

  9. Substitution of cobalt alloying in PWR primary circuit gate valves

    International Nuclear Information System (INIS)

    Cachon, L.; Sudreau, F.; Brunel, L.

    1995-01-01

    The object of this study is qualify cobalt-free alternative alloys for valve applications. This paper focus on tribological characterization of numerous coatings is done by using the first one, of a classical type. Then tests are performed with the second one which simulates solicitations supported by gate valves in primary circuit of PWR. 35% Ni-Cr - 65% Cr 3 C 2 coating, deposited by detonation gun technology, gives us hope to find a substitute of Stelite 6. (author). 5 refs., 16 figs., 2 tabs

  10. Study of the distribution of hydrogen in a PWR containment with CFD codes; Estudio de la distribucion de hidrogeno en una contencion PWR con codigos CFD

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, G.; Matias, R.; Fernandez, K.; Justo, D.; Bocanegra, R.; Mena, L.; Queral, C.

    2015-07-01

    During a severe accident in a PWR, the hydrogen generated may be distributed in the containment atmosphere and reach the combustion conditions that can cause the containment failure. In this research project, a preliminary study has been done about the capacities of ANSYS Fluent 15.0 and GOTHIC 8.0 to tri dimensional distribution of the hydrogen in a PWR containment during a severe accident. (Author)

  11. Competitiveness basis of integrated PWR technology

    International Nuclear Information System (INIS)

    Florido, Pablo C.; Bergallo, Juan E.

    1999-01-01

    The present nuclear power market is dominated by LWR, with a minor fraction of CANDU contribution due to its advantages in small and medium electric grid. Nowadays the demand for nuclear reactors is concentrated in Asia and this situation will probably not change in the short and medium term, even under the financial crisis. The Asian market needs large plants, and feedback regarding demand and products has been done (AP 600 and Sbwr) in studies of passive systems to higher power range. Present active nuclear power programs take place in countries with high GNP growth and related electricity energy demand far from expectancies in the '80. Four of these countries were in the list of the top 10 most dynamical nations. Traditionally, nuclear countries have large economies and electric grids or strong national nuclear commitment. However, in the near future the demand of nuclear reactors seems to move towards faster growing economies and countries, with new electrical grids. From the point of view of the competitiveness, higher power nuclear plants are seriously questioned in this new market. The International Atomic Energy Agency has promoted studies in the field of small nuclear power plants (around 300 M We) for a long time. These designs have never reached commercial level in industrialized countries. One reason has been that the reactor technology naturally moves towards the best economy, i.e. the greater power. The second reason has been that the nuclear designers were always in countries with large electric systems. Consequently the utilities never have been attracted by prototypes of small reactors. The only option to develop a competitive medium nuclear reactors is to develop a design with different scale economy, like the scale economy of CCGT. If LWR technology is used, the design could be the best alternative for the utilities, because the availability of present LWR is one of the main advantages as a proved power source. The most promising type of LWR with

  12. Connecting textual segments

    DEFF Research Database (Denmark)

    Brügger, Niels

    2017-01-01

    history than just the years of the emergence of the web, the chapter traces the history of how segments of text have deliberately been connected to each other by the use of specific textual and media features, from clay tablets, manuscripts on parchment, and print, among others, to hyperlinks on stand......In “Connecting textual segments: A brief history of the web hyperlink” Niels Brügger investigates the history of one of the most fundamental features of the web: the hyperlink. Based on the argument that the web hyperlink is best understood if it is seen as another step in a much longer and broader...

  13. Segmenting patients and physicians using preferences from discrete choice experiments.

    Science.gov (United States)

    Deal, Ken

    2014-01-01

    People often form groups or segments that have similar interests and needs and seek similar benefits from health providers. Health organizations need to understand whether the same health treatments, prevention programs, services, and products should be applied to everyone in the relevant population or whether different treatments need to be provided to each of several segments that are relatively homogeneous internally but heterogeneous among segments. Our objective was to explain the purposes, benefits, and methods of segmentation for health organizations, and to illustrate the process of segmenting health populations based on preference coefficients from a discrete choice conjoint experiment (DCE) using an example study of prevention of cyberbullying among university students. We followed a two-level procedure for investigating segmentation incorporating several methods for forming segments in Level 1 using DCE preference coefficients and testing their quality, reproducibility, and usability by health decision makers. Covariates (demographic, behavioral, lifestyle, and health state variables) were included in Level 2 to further evaluate quality and to support the scoring of large databases and developing typing tools for assigning those in the relevant population, but not in the sample, to the segments. Several segmentation solution candidates were found during the Level 1 analysis, and the relationship of the preference coefficients to the segments was investigated using predictive methods. Those segmentations were tested for their quality and reproducibility and three were found to be very close in quality. While one seemed better than others in the Level 1 analysis, another was very similar in quality and proved ultimately better in predicting segment membership using covariates in Level 2. The two segments in the final solution were profiled for attributes that would support the development and acceptance of cyberbullying prevention programs among university

  14. Life management plants at nuclear power plants PWR; Planes de gestion de vida en centrales nucleares PWR

    Energy Technology Data Exchange (ETDEWEB)

    Esteban, G.

    2014-10-01

    Since in 2009 the CSN published the Safety Instruction IS-22 (1) which established the regulatory framework the Spanish nuclear power plants must meet in regard to Life Management, most of Spanish nuclear plants began a process of convergence of their Life Management Plants to practice 10 CFR 54 (2), which is the current standard of Spanish nuclear industry for Ageing Management, either during the design lifetime of the plant, as well as for Long-Term Operation. This article describe how Life Management Plans are being implemented in Spanish PWR NPP. (Author)

  15. Segmentation in cinema perception.

    Science.gov (United States)

    Carroll, J M; Bever, T G

    1976-03-12

    Viewers perceptually segment moving picture sequences into their cinematically defined units: excerpts that follow short film sequences are recognized faster when the excerpt originally came after a structural cinematic break (a cut or change in the action) than when it originally came before the break.

  16. Dictionary Based Image Segmentation

    DEFF Research Database (Denmark)

    Dahl, Anders Bjorholm; Dahl, Vedrana Andersen

    2015-01-01

    We propose a method for weakly supervised segmentation of natural images, which may contain both textured or non-textured regions. Our texture representation is based on a dictionary of image patches. To divide an image into separated regions with similar texture we use an implicit level sets...

  17. Unsupervised Image Segmentation

    Czech Academy of Sciences Publication Activity Database

    Haindl, Michal; Mikeš, Stanislav

    2014-01-01

    Roč. 36, č. 4 (2014), s. 23-23 R&D Projects: GA ČR(CZ) GA14-10911S Institutional support: RVO:67985556 Keywords : unsupervised image segmentation Subject RIV: BD - Theory of Information http://library.utia.cas.cz/separaty/2014/RO/haindl-0434412.pdf

  18. Metrics for image segmentation

    Science.gov (United States)

    Rees, Gareth; Greenway, Phil; Morray, Denise

    1998-07-01

    An important challenge in mapping image-processing techniques onto applications is the lack of quantitative performance measures. From a systems engineering perspective these are essential if system level requirements are to be decomposed into sub-system requirements which can be understood in terms of algorithm selection and performance optimization. Nowhere in computer vision is this more evident than in the area of image segmentation. This is a vigorous and innovative research activity, but even after nearly two decades of progress, it remains almost impossible to answer the question 'what would the performance of this segmentation algorithm be under these new conditions?' To begin to address this shortcoming, we have devised a well-principled metric for assessing the relative performance of two segmentation algorithms. This allows meaningful objective comparisons to be made between their outputs. It also estimates the absolute performance of an algorithm given ground truth. Our approach is an information theoretic one. In this paper, we describe the theory and motivation of our method, and present practical results obtained from a range of state of the art segmentation methods. We demonstrate that it is possible to measure the objective performance of these algorithms, and to use the information so gained to provide clues about how their performance might be improved.

  19. 21-PWR Waste Package Side and End Impacts

    International Nuclear Information System (INIS)

    V. Delabrosse

    2003-01-01

    The objective of this calculation is to determine the structural response of a 21-Pressurized Water Reactor (PWR) spent nuclear fuel waste package impacting an unyielding surface. A range of initial velocities and initial angles between the waste package and the unyielding surface is studied. The scope of this calculation is limited to estimating the area of the outer shell (OS) where the residual stress exceeds a given limit (hereafter ''damaged area''). The stress limit is defined as a fraction of the yield strength of the OS material, Alloy 22 (SB-575 N06022), at the appropriate temperature. The design of the 21-PWR waste package used in this calculation is that defined in Reference 8. However, a value of 4 mm was used for the gap between the inner shell and the OS, and the thickness of the OS was reduced by 2 mm. The sketch in Attachment I provides additional information not included in Reference 8. All obtained results are valid for this design only. This calculation is associated with the waste package design and was performed by the Specialty Analyses and Waste Package Design Section. The waste package (i.e. uncanistered spent nuclear fuel disposal container) is classified as Quality Level 1

  20. 21-PWR Waste Package Side and End Impacts

    International Nuclear Information System (INIS)

    T. Schmitt

    2005-01-01

    The objective of this calculation is to determine the structural response of a 21-Pressurized Water Reactor (PWR) spent nuclear fuel waste package impacting an unyielding surface. A range of initial velocities and initial angles between the waste package and the unyielding surface is studied. The scope of this calculation is limited to estimating the area of the outer shell (OS) where the residual stress exceeds a given limit (hereafter ''damaged area''). The stress limit is defined as a fraction of the yield strength of the OS material, Alloy 22 (SB-575 N06022), at the appropriate temperature. The design of the 21-PWR waste package used in this calculation is that defined in Reference 8. However, a value of 4 mm was used for the gap between the inner shell and the OS, and the thickness of the OS was reduced by 2 mm. The sketch in Attachment I provides additional information not included in Reference 8. All obtained results are valid for this design only. This calculation is associated with the waste package design and was performed by the Specialty Analyses and Waste Package Design Section. The waste package (i.e. uncanistered spent nuclear fuel disposal container) is classified as Quality Level 1

  1. Fracture toughness behavior of irradiated stainless steel in PWR systems

    Energy Technology Data Exchange (ETDEWEB)

    Xu, H.; Fyfitch, S. [AREVA NP Inc., Lynchburg, Pennsylvania (United States); Tang, H.T. [Electric Power Research Inst., Palo Alto, California (United States)

    2007-07-01

    Data from available research programs were collected and evaluated by the Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) to determine the relationship between fracture toughness and neutron fluence for conditions representative of pressurized water reactor (PWR) conditions. It is shown that the reduction of fracture toughness with increasing neutron dose in both boiling water reactors (BWRs) and PWRs is consistent with that observed in fast reactors. The lower bound fracture toughness observed for irradiated stainless steels in PWRs is 38 MPa{radical}m (34.6 ksi{radical}in) at neutron exposures greater than 6.7 X 10{sup 21} n/cm{sup 2} (E > 1.0 MeV) or approximately 10 dpa. For such levels of fracture toughness, it is recommended that linear-elastic fracture mechanics (LEFM) analyses be considered for design and operational analyses. The results from this study can be used by the nuclear industry to assess the effects of irradiation on stainless steels in PWR systems. (author)

  2. Improved liquid waste processing system of PWR plant

    International Nuclear Information System (INIS)

    Suehiro, Kazuyasu

    1977-01-01

    Mitsubishi Heavy Industries, Ltd. has engaged in the improvement and enhancement of waste-processing facilities for PWR power stations, and recently established the improved processing system. With this system, it becomes possible to contain radioactive waste gas semi-permanently within plants and to recycle waste liquid after the treatment, thus to make the release of radioactive wastes practically zero. The improved system has the following features, namely the recycling system is adopted, drain is separated and each separated drain is treated by specialized process, the reboiler type evaporator and the reverse osmosis equipment are used, and the leakless construction is adopted for the equipments. The radioactive liquid wastes in PWR power stations are classified into coolant drain, drain from general equipments, chemical drain and cleaning water. The outline of the improved processing system and the newly developed equipments such as the reboiler type evaporator and the reverse osmosis equipment are explained. With the evaporator, the concentration rate of waste liquid can be raised to about three times, and foaming waste can be treated efficiently. The decontamination performance is excellent. The reverse osmosis treatment is stable and reliable method, and is useful for the treatment of cleaning water. It is also effective for concentrating treatment. The unmanned automatic operation is possible. (Kako, I.)

  3. Application of burnup credit for PWR spent fuel storage pool

    International Nuclear Information System (INIS)

    Shin, Hee Sung; Ro, Seung-Gy; Bae, Kang Mok; Kim, Ik Soo; Shin, Young Joon

    1999-01-01

    A study on the application of burnup credit for a PWR spent fuel storage pool has been investigated using a computer code system such as CSAS6 module of SCALE 4.3 in association with 44-group SCALE cross-section library. The calculation bias of the code system at a 95% probability with a 95% confidence level seems to be 0.00951 by benchmarking the system for forty six experimental data. With the aid of this computer code system, criticality analysis has been performed for the PWR spent fuel storage pool. Uncertainties due to postulated abnormal and accidental conditions, and manufacturing tolerance such as stainless steel thickness of storage rack, fuel enrichment, fuel density and box size have statistically been combined and resulted in 0.00674. Also, isotopic correction factor which was based on the calculated and measured concentration of 43 isotopes for both selected actinides and fission products important in burnup credit application has been taken into account in the criticality analysis. It is revealed that the minimum burnup with the corrected isotopic concentrations as required for the safe storage is 5,730 MWd/tU in enriched fuel of 5.0 wt%. (author)

  4. Assessment of environmentally assisted cracking in PWR pressure vessel steels

    International Nuclear Information System (INIS)

    Tice, D.R.

    1991-01-01

    There is a possibility that extension of pre-existing flaws in the reactor pressure vessel of a pressurised water reactor (PWR) may occur by environmentally assisted cracking, in particular by corrosion fatigue under cyclic transient loading. Crack growth predictions have usually been carried out using cyclic crack growth rate (da/dN) versus stress intensity range (δK) curves, such as those given in Section XI, Appendix A of the ASME Boiler and Pressure Vessel Code. However, the inherent time dependent nature of environmental cracking processes renders such an approach unrealistic. The present paper describes the development of an alternative time based assessment methodology. Illustrative calculations of expected crack growth of assumed defects made using the cyclic (ASME XIA) and time-based approaches are compared. The results illustrate that crack growth predicted by the time-based approach can be greater or less than that calculated by the traditional method. For a PWR operated with good control of water chemistry, actual crack growth rates are expected to be well below those predicted by the ASME code. (Author)

  5. Design and Development of Virtual Reactivity System for PWR

    International Nuclear Information System (INIS)

    Anwar, M. I.

    2012-01-01

    The reactivity monitoring and investigation is an important mean to ensure the safety operation of a nuclear power plant. But the reactivity of the nuclear reactor usually cannot be directly measured. It should be computed with certain estimation method. In this thesis, an effort has been made using an artificial neural network and highly fluctuating experimental data for predicting the total reactivity of the nuclear reactor based on all components of net reactivity. This virtual reactivity system is designed by taking advantage of neural network's nonlinear mapping capability. Based on analysis of the reactivity contributing factors, several neural network models are built separately for control rod, boron, poisons, fuel Doppler Effect and moderator effect. Extensive simulation and validation tests for PWR show that satisfied results have been obtained with the proposed approach. It presents a new idea to estimate the PWR's reactivity using artificial intelligence. All the design and simulation work is carried out in MATLAB and a real time programming environment is chosen for the computation and prediction of reactivity. (author)

  6. A comprehensive in-pile test of PWR fuel bundle

    Energy Technology Data Exchange (ETDEWEB)

    Kang Rixin; Zhang Shucheng; Chen Dianshan (Academia Sinica, Beijing (China). Inst. of Atomic Energy)

    1991-02-01

    An in-pile test of PWR fuel bundle has been conducted in HWRR at IAE of China. This paper describes the structure of the test bundle (3x3-2), fabrication process and quality control of the fuel rod, irradiation conditions and the main Post Irradiation Examination (PIE) results. The test fuel bundle was irradiated under the PWR operation and water chemistry conditions with an average linear power of 381 W/cm and reached an average burnup of 25010 MWd/tU of the fuel bundle. After the test, destructive and non-destructive examination of the fuel rods was conducted at hot laboratories. The fission gas release was 10.4-23%. The ridge height of cladding was 3 to 8 {mu}m. The hydrogen content of the cladding was 80 to 140 ppm. The fuel stack height was increased by 2.9 to 3.3 mm. The relative irradiation growth was about 0.11 to 0.17% of the fuel rod length. During the irradiation test, no fuel rod failure or other abnormal phenomena had been found by the on-line fuel failure monitoring system of the test loop and water sampling analysis. The structure of the test fuel assembly was left undamaged without twist and detectable deformation. (orig.).

  7. Beta and gamma dose calculations for PWR and BWR containments

    International Nuclear Information System (INIS)

    King, D.B.

    1989-07-01

    Analyses of gamma and beta dose in selected regions in PWR and BWR containment buildings have been performed for a range of fission product releases from selected severe accidents. The objective of this study was to determine the radiation dose that safety-related equipment could experience during the selected severe accident sequences. The resulting dose calculations demonstrate the extent to which design basis accident qualified equipment could also be qualified for the severe accident environments. Surry was chosen as the representative PWR plant while Peach Bottom was selected to represent BWRs. Battelle Columbus Laboratory performed the source term release analyses. The AB epsilon scenario (an intermediate to large LOCA with failure to recover onsite or offsite electrical power) was selected as the base case Surry accident, and the AE scenario (a large break LOCA with one initiating event and a combination of failures in two emergency cooling systems) was selected as the base case Peach Bottom accident. Radionuclide release was bounded for both scenarios by including spray operation and arrested sequences as variations of the base scenarios. Sandia National Laboratories used the source terms to calculate dose to selected containment regions. Scenarios with sprays operational resulted in a total dose comparable to that (2.20 x 10 8 rads) used in current equipment qualification testing. The base case scenarios resulted in some calculated doses roughly an order of magnitude above the current 2.20 x 10 8 rad equipment qualification test region. 8 refs., 23 figs., 12 tabs

  8. Development of MHI PWR fuel assembly with high thermal performance

    International Nuclear Information System (INIS)

    Yasushi Makino; Masaya Hoshi; Masaji Mori; Hidetoshi Kido; Kazuo Ikeda

    2005-01-01

    Mitsubishi Heavy Industries, Ltd. (MHI) has been developing a PWR fuel assembly to meet the needs of Japanese fuel market with mainly improving its reliability such as a mechanical strength, a seismic strength and endurance. For burn-up extension of the fuel to 55 GWd/t, MHI has introduced a Zircaloy spacer grid with better neutron economics with retaining the reliability in an operating core. However, for a future power up-rating and a longer cycle operation, a higher thermal performance is required for PWR fuel assembly. To meet the needs of fuel market, MHI has developed an advanced type of Zircaloy spacer grid with a greater DNB performance while retaining the reliability of a fuel and a relatively low pressure drop. For the greater DNB performance, MHI optimized geometrical shape of mixing vane to promote a fluid mixing performance. In this report, higher DNB performance provided by the advanced Zircaloy spacer grid is presented. The results of 3D simulation for the flow behavior in 5 x 5 partial assembly, a mixing test and a water DNB test were compared between the current and the advanced spacer grids. Consequently, it was confirmed that a crossover vane enhanced a fluid mixing and the advanced spacer grid could significantly improve DNB performance compared with the current design of spacer grids. (authors)

  9. Reverse depletion method for PWR core reload design

    International Nuclear Information System (INIS)

    Downar, T.J.; Kim, Y.J.

    1985-01-01

    Low-leakage fuel management is currently practiced in over half of all pressurized water reactor (PWR) cores. Prospects for even greater use of in-board fresh fuel loading are good as utilities seek to reduce core vessel fluence, mitigate pressurized thermal shock concerns, and extend vessel lifetime. Consequently, large numbers of burnable poison (BP) pins are being used to control the power peaking at the in-board fresh fuel positions. This has presented an additional complexity to the core reload design problem. In addition to determining the best location of each assembly in the core, the designer must concurrently determine the distribution of BP pins in the fresh fuel. A procedure was developed that utilizes the well-known Haling depletion to achieve an end-of-cycle (EOC) core state where the assembly pattern is configured in the absence of all control poison. This effectively separates the assembly assignment and BP distribution problems. Once an acceptable pattern at EOC is configured, the burnable and soluble poison required to control the power and core excess reactivity are solved for as unknown variables while depleting the cycle in reverse from the EOC exposure distribution to the beginning of cycle. The methods developed were implemented in an approved light water reactor licensing code to ensure the validity of the results obtained and provide for the maximum utility to PWR core reload design

  10. Fiber optic components compatibility with the PWR containment radiation field

    International Nuclear Information System (INIS)

    Breuze, G.; Serre, J.

    1990-01-01

    Present and future applications of fiber optics transmission in the nuclear industrial field are emphasized. Nuclear acceptance criteria for relevant electronic equipments in terms of radiation dose rate, integrated dose and required reliability are given. Ambient conditions of PWR containment are especially considered in the present paper. Experimental results of optical fibers and end-components exposed to 60 Co gamma rays are successively shown. Main radiation response characteristics up to 10 4 Gy (with dose rates of about 100 Gy.h -1 ) of both multimodal fiber families (step index and gradient index fibers) are compared. Predominant features of pure silica core fibers are: * an efficient photobleaching with near IR light from LED and LD commonly used in transmission data links, * a radiation hardening reducing induced losses down to 10 dB.km -1 in fine fibers up to date with latest developments. Dose rate effect on induced losses is also outlined for these fibers. Optoelectronic fiber-end components radiation response is good only for special LED (AsGa) and PD (Si). Radiation behavior of complex pigtailed LDM (laser diode + photodiode + Peltier element + thermistor) is not fully acceptable and technological improvements were made. Preliminary results are given. Two applications of fiber links transmitting data in a PWR containment and a hot cell are described. Hardening levels obtained and means required are given

  11. Transient analysis of blowdown thrust force under PWR LOCA

    International Nuclear Information System (INIS)

    Yano, Toshikazu; Miyazaki, Noriyuki; Isozaki, Toshikuni

    1982-10-01

    The analytical results of blowdown characteristics and thrust forces were compared with the experiments, which were performed as pipe whip and jet discharge tests under the PWR LOCA conditions. The blowdown thrust forces obtained by Navier-Stokes momentum equation about a single-phase, homogeneous and separated two-phase flow, assuming critical pressure at the exit if a critical flow condition was satisfied. The following results are obtained. (1) The node-junction method is useful for both the analyses of the blowdown thrust force and of the water hammer phenomena. (2) The Henry-Fauske model for subcooled critical flow is effective for the analysis of the maximum thrust force under the PWR LOCA conditions. The jet thrust parameter of the analysis and experiment is equal to 1.08. (3) The thrust parameter of saturated blowdown has the same one with the value under pressurized condition when the stagnant pressure is chosen as the saturated one. (4) The dominant terms of the blowdown thrust force in the momentum equation are the pressure and momentum terms except that the acceleration term has large contribution only just after the break. (5) The blowdown thrust force in the analysis greatly depends on the selection of the exit pressure. (author)

  12. Gamma and Neutron Radiolysis in the 21-PWR Waste Package

    Energy Technology Data Exchange (ETDEWEB)

    J.S. Tang

    2001-05-03

    The objective of this calculation is to compute gamma and neutron dose rates in order to determine the maximum radiolytic production of nitric acid and other chemical species inside the 21-PWR (pressurized-water reactor) waste package (WP). The scope of this calculation is limited to the time period between 5,000 and 100,000 years after emplacement. The information provided by the sketches attached to this calculation is that of the potential design for the type of WP considered in this calculation. The results of this calculation will be used to evaluate nitric acid corrosion of fuel cladding from radiolysis in the 21-PWR WP. This calculation was performed in accordance with the Technical Work Plan for: Waste Package Design Description for LA (Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M&O) 2000a). AP-3.124, Calculations, is used to perform the calculation and develop the document. This calculation is associated with the total system performance assessment (TSPA) of which the spent fuel cladding integrity is to be evaluated.

  13. Gamma and Neutron Radiolysis in the 21-PWR Waste Package

    International Nuclear Information System (INIS)

    J.S. Tang

    2001-01-01

    The objective of this calculation is to compute gamma and neutron dose rates in order to determine the maximum radiolytic production of nitric acid and other chemical species inside the 21-PWR (pressurized-water reactor) waste package (WP). The scope of this calculation is limited to the time period between 5,000 and 100,000 years after emplacement. The information provided by the sketches attached to this calculation is that of the potential design for the type of WP considered in this calculation. The results of this calculation will be used to evaluate nitric acid corrosion of fuel cladding from radiolysis in the 21-PWR WP. This calculation was performed in accordance with the Technical Work Plan for: Waste Package Design Description for LA (Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) 2000a). AP-3.124, Calculations, is used to perform the calculation and develop the document. This calculation is associated with the total system performance assessment (TSPA) of which the spent fuel cladding integrity is to be evaluated

  14. A new approach to PWR power control using intelligent techniques

    International Nuclear Information System (INIS)

    Boroushaki, M.; Ghofrani, M.B.; Lucas, C.; Yazdanpanah, M.J.; Sadati, N.

    2004-01-01

    Improved load following capability is one of the main technical performances of advanced PWR(APWR). Controlling the nuclear reactor core during load following operation encounters some difficulties. These difficulties mainly arise from nuclear reactor core limitations in local power peaking, while the core is subject to large and sharp variation of local power density during transients. Axial offset (A.O) is the parameter usually used to represent of core power peaking, in form of a practical parameter. This paper, proposes a new intelligent approach to A.o control of PWR nuclear reactors core during load following operation. This method uses a neural network model of the core to predict the dynamic behavior of the core and a fuzzy critic based on the operator knowledge and experience for the purpose of decision-making during load following operations. Simulation results show that this method can use optimum control rod groups maneuver with variable overlapping and may improve the reactor load following capability

  15. Modifications needed to operate PWR's plants in G-Mode

    International Nuclear Information System (INIS)

    Stainman, J.P.

    1985-01-01

    The production of electricity from PWR nuclear plants represents 44% of the total production of electricity in France for 1984, and 68% of the electricity produced by Thermal power plants (127 TWh over 187 TWh). These data show clearly that the French PWR plants do not work in ''base mode'' anymore but have to fit production with consumption, in other words to assume the frequency control. To participate permanently to the load follow and frequency control, it appeared that some improvements in the field of pressurizer level and pressure control were necessary as well as in the field of operator aids computer. It should be noted that these improvements are useful even without taking into account the constraints due to load follow and frequency control because of the mechanical stress in the CVCS piping, for instance. Some additional tests are planned to better identify this specific problem. The need of a more flexible operating mode than ones given by the initial system (black control rods), significantly reduced in 1973 due to the application of the ECCS criterion, led EDF and Framatome to develop a new operating mode (G. Mode) allowing a faster power escalation (5% PN/mn) whatever the fuel burn-up. This new operating mode improves significantly also the flexibility of operation when the frequency control is needed, and helps a lot the operators in such cases. All the 900 MWe Nuclear plants will be able to operate in ''G mode'' before the end of 1984

  16. Liquid radioactive waste processing improvement of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Nery, Renata Wolter dos Reis; Martinez, Aquilino Senra; Monteiro, Jose Luiz Fontes

    2005-01-01

    The study evaluate an inorganic ion exchange to process the low level liquid radwaste of PWR nuclear plants, so that the level of the radioactivity in the effluents and the solid waste produced during the treatment of these liquid radwaste can be reduced. The work compares two types of ion exchange materials, a strong acid cation exchange resin, that is the material typically used to remove radionuclides from PWR nuclear plants wastes, and a mordenite zeolite. These exchange material were used to remove cesium from a synthetic effluent containing only this ion and another effluent containing cesium and cobalt. The breakthrough curves of the zeolite and resin using a fix bed reactor were compared. The results demonstrated that the zeolite is more efficient than the resin in removing cesium from a solution containing cesium and cobalt. The results also showed that a bed combining zeolite and resin can process more volume of an effluent containing cesium and cobalt than a bed resin alone. (author)

  17. Four-fluid model of PWR degraded cores

    International Nuclear Information System (INIS)

    Dearing, J.F.

    1985-01-01

    This paper describes the new two-dimensional, four-fluid fluid dynamics and heat transfer (FLUIDS) module of the MELPROG code. MELPROG is designed to give an integrated, mechanistic treatment of pressurized water reactor (PWR) core meltdown accidents from accident initiation to vessel melt-through. The code has a modular data storage and transfer structure, with each module providing the others with boundary conditions at each computational time step. Thus the FLUIDS module receives mass and energy source terms from the fuel pin module, the structures module, and the debris bed module, and radiation energy source terms from the radiation module. MELPROG, which models the reactor vessel, is also designed to model the vessel as a component in the TRAC/PF1 networking solution of a PWR reactor coolant system (RCS). The coupling between TRAC and MELPROG is implicit in the fluid dynamics of the reactor coolant (liquid water and steam) allowing an accurate simulation of the coupling between the vessel and the rest of the RCS during an accident. This paper deals specifically with the numerical model of fluid dynamics and heat transfer within the reactor vessel, which allows a much more realistic simulation (with less restrictive assumptions on physical behavior) of the accident than has been possible before

  18. SCC of Alloy 600 components in PWR primary loop

    International Nuclear Information System (INIS)

    Gomez-Briceno, Dolores; Lapena, Jesus; Castano, M. Luisa; Blazquez, Fernando

    2002-01-01

    Full text: Cracking due to PWSCC in PWR CRDM nozzles and other VHP nozzles fabricated from Alloy 600 is not a new issue. In 1991, a leak was discovered on one CRDM nozzle at Bugey 3 PWR plant in France. The cause of the cracking was identified as primary water stress corrosion cracking. From then, similar cracks have been found in other European and USA PWR plants. The cracks were predominantly axial in orientation and it was accepted that CRDM nozzles and weld cracking in PWR was not a immediate safety concern. However, this consideration has to be reassessed in light of the recent identification of circumferential cracking in CRDM nozzles at Oconee Nuclear Station Unit 2 and 3 along with axial cracking in the Alloy 182 J-groove welds at these two units and at Oconee Nuclear Station 1 and Arkansas Nuclear One Unit 1. Alloy 600 susceptibility in primary water has received an enormous research effort for many years since the Alloy 600 steam generators tube degradation started. A significant amount of information is available to characterise the susceptibility of Alloy 600. However, Alloy 600 susceptibility is strongly dependent on the heat thermomechanical history and both the crack initiation time and the crack growth rate data obtained from representative materials of the VHP nozzles seem to be necessary for the structural integrity assessment of cracking nozzles. An extensive experimental program has been performed at CIEMAT, to study the behaviour of Alloy 600 VHP nozzles in PWR primary conditions. Crack initiation and crack propagation tests have been performed using different types of products (forged bar, tube, plate and steam generator tubing). Long duration crack initiation tests have been carried out, at 330 deg. C and 360 deg. C in water and at 400 deg. C in steam, using ten Alloy 600 heats with yield strength ranging from 291 MPa to 489 MPa. The influence of several parameters (grain boundary carbide distribution, grain size and yield strength) on crack

  19. Analysis of a bending test on a full-scale PWR hot leg elbow containing a surface crack

    Energy Technology Data Exchange (ETDEWEB)

    Delliou, P. le [Electricite de France, EDF, 77 - Moret-sur-Loing (France). Dept. MTC; Julisch, P.; Hippelein, K. [Stuttgart Univ. (Germany). Staatliche Materialpruefungsanstalt; Bezdikian, G. [Electricite de France, EDF, 92 - Paris la Defense (France). Direction Production Transport

    1998-11-01

    EDF, in co-operation with Framatome, has conducted a large research programme on the mechanical behaviour of thermally aged cast duplex stainless steel elbows, which are part of the main primary circuit of French PWR. One important task of this programme consisted of testing a full-scale PWR hot leg elbow. The elbow contained a semi-elliptical circumferential notch machined on the outer surface of the intrados as well as casting defects located on the flanks. To simulate the end-of-life condition of the component regarding material toughness, it had undergone a 2400 hours ageing heat treatment at 400 C. The test preparation and execution, as well as the material characterization programme, were committed to MPA. The test was conducted under constant internal pressure and in-plane bending (opening mode) at 200 C. For safety reasons, it took place on an open air-site: the Meppen military test ground. At the maximum applied moment (6000 kN.m), the notch did not initiate. This paper presents the experimental results and the fracture mechanics analysis of the test, based on finite element calculations. (orig.)

  20. Evaluation of the heat transfer in a geological repository concept containing PWR, VHTR and hybrid ads-fission spent fuels

    Energy Technology Data Exchange (ETDEWEB)

    Jonusan, Raoni A.S.; Pereira, Fernando; Velasquez, Carlos E.; Salome, Jean A.D.; Cardoso, Fabiano; Pereira, Claubia; Fortini, Angela, E-mail: claubia@nuclear.ufmg.br [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Departamento de Engenharia Nuclear

    2017-11-01

    The investigation of the thermal behavior of spent fuel (SF) materials is essential to determining appropriate potential sites to accommodate geological repositories as well as the design of canisters, considering their potential risk to people health and of environmental contamination. This work presents studies of the temperature in a canister containing spent fuels discharged from Pressurized Water Reactor (PWR), Very High-Temperature Reactor (VHTR) and Accelerator-Driven Subcritical Reactor System (ADS) reactor systems in a geological repository concept. The thermal analyses were performed with the software ANSYS, which is widely used to solve engineering problems through the Finite Element Method. The ANSYS Transient Thermal module was used. The spent nuclear fuels were set as heat sources using data of previous studies derived from decay heat curves. The studies were based on comparison of the mean temperature on a canister surface along the time under geological disposal conditions, for a same amount of each type of spent nuclear fuel evaluated. The results conclude that fuels from VHTR and ADS systems are inappropriate to be disposed in a standardized PWR canister, demanding new studies to determine the optimal amount of spent fuel and new internal canister geometries. It is also possible to conclude that the hypothetical situation of a single type of canister being used to accommodate different types of spent nuclear fuels is not technically feasible. (author)