WorldWideScience

Sample records for purpose qualifications appointment

  1. Appointment, qualifications and responsibilities of ventilation officers

    International Nuclear Information System (INIS)

    1981-01-01

    The Code provides for the appointment of a ventilation officer when required by the appropriate authority. This guideline offers comment on the appointment, qualifications, training and responsibilities of that person

  2. Methods of appointment and qualifications of club doctors and physiotherapists in English professional football: some problems and issues.

    Science.gov (United States)

    Waddington, I; Roderick, M; Naik, R

    2001-02-01

    To examine the methods of appointment, experience, and qualifications of club doctors and physiotherapists in professional football. Semistructured tape recorded interviews with 12 club doctors, 10 club physiotherapists, and 27 current and former players. A questionnaire was also sent to 90 club doctors; 58 were returned. In almost all clubs, methods of appointment of doctors are informal and reflect poor employment practice: posts are rarely advertised and many doctors are appointed on the basis of personal contacts and without interview. Few club doctors had prior experience or qualifications in sports medicine and very few have a written job description. The club doctor is often not consulted about the appointment of the physiotherapist; physiotherapists are usually appointed informally, often without interview, and often by the manager without involving anyone who is qualified in medicine or physiotherapy. Half of all clubs do not have a qualified (chartered) physiotherapist; such unqualified physiotherapists are in a weak position to resist threats to their clinical autonomy, particularly those arising from managers' attempts to influence clinical decisions. Almost all aspects of the appointment of club doctors and physiotherapists need careful re-examination.

  3. 5 CFR 302.403 - Qualifications for promotion.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications for promotion. 302.403... EMPLOYMENT IN THE EXCEPTED SERVICE Selection and Appointment; Reappointment; and Qualifications for Promotion § 302.403 Qualifications for promotion. In determining qualifications for promotion with respect to an...

  4. 5 CFR 319.302 - Individual qualifications.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Individual qualifications. 319.302... Individual qualifications. Agency heads are delegated authority to approve the qualifications of individuals appointed to SL and ST positions. The agency head must determine that the individual meets the...

  5. 5 CFR 317.502 - Qualifications Review Board certification.

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS EMPLOYMENT IN THE SENIOR EXECUTIVE SERVICE Career Appointments § 317.502 Qualifications Review Board certification. (a) A Qualification Review Board (QRB) convened by OPM must certify the executive... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications Review Board certification...

  6. 42 CFR 21.47 - Examination; anticipation of meeting qualifications.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Examination; anticipation of meeting qualifications. 21.47 Section 21.47 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES PERSONNEL COMMISSIONED OFFICERS Appointment § 21.47 Examination; anticipation of meeting qualifications. A...

  7. 5 CFR 531.212 - Superior qualifications and special needs pay-setting authority.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Superior qualifications and special needs... Appointment Or Position Changes § 531.212 Superior qualifications and special needs pay-setting authority. (a) Agency authority. (1) An agency may use the superior qualifications and special needs pay-setting...

  8. Portfolio of qualifications: a tool for evaluating academic productivity at the Karolinska Institutet.

    Science.gov (United States)

    Dahllöf, G; Ekstrand, J; Nordenström, J

    1999-02-01

    A Portfolio of Qualifications for academic appointments at the Karolinska Institutet has been developed to define more clearly the competence and qualifications which are given high priority for academic appointments at the Karolinska Institutet. The major fields of application are for new appointments and promotions, providing guidelines for the individual for improving his/her proficiency, and as a basis for determining individual salary rates. Four portfolios have been developed, a pedagogical, a clinical, a scientific, and a leadership, development and workplace relations portfolio. Attached to the portfolios are assessment forms. We consider the Qualifications Portfolio to be a reflection of changes in attitudes and values at the Karolinska Institutet. The system offers a method for the recognition of faculty productivity in different dimensions. This may be beneficial for the university in view of the increasing diversity and complexity of academic institutions. The Qualifications portfolio can be obtained from the world wide web, http:/(/)www.ki.se/ki/merit.se.html (in Swedish), http:/(/)www.ki.se/ki/merit.html (in English).

  9. 48 CFR 6301.2 - Qualifications of members.

    Science.gov (United States)

    2010-10-01

    ... contract law. ... CONTRACT APPEALS BOARD OF CONTRACT APPEALS 6301.2 Qualifications of members. Each member of the Board must... administrative law judges appointed pursuant to section 3105 of title 5 of the United States Code, with the...

  10. Appointment length, psychiatrists' communication behaviors, and medication management appointment adherence.

    Science.gov (United States)

    Cruz, Mario; Roter, Debra L; Cruz, Robyn F; Wieland, Melissa; Larson, Susan; Cooper, Lisa A; Pincus, Harold Alan

    2013-09-01

    The authors explored the relationship between critical elements of medication management appointments (appointment length, patient-centered talk, and positive nonverbal affect among providers) and patient appointment adherence. The authors used an exploratory, cross-sectional design employing quantitative analysis of 83 unique audio recordings of split treatment medication management appointments for 46 African-American and 37 white patients with 24 psychiatrists at four ambulatory mental health clinics. All patients had a diagnosis of depression. Data collected included demographic information; Patient Health Questionnaire-9 scores for depression severity; psychiatrist verbal and nonverbal communication behaviors during medication management appointments, identified by the Roter Interaction Analysis System during analysis of audio recordings; and appointment adherence. Bivariate analyses were employed to identify covariates that might influence appointment adherence. Generalized estimating equations (GEEs) were employed to assess the relationship between appointment length, psychiatrist patient-centered talk, and positive voice tone ratings and patient appointment adherence, while adjusting for covariates and the clustering of observations within psychiatrists. Wald chi square analyses were used to test whether all or some variables significantly influenced appointment adherence. GEE revealed a significant relationship between positive voice tone ratings and appointment adherence (p=.03). Chi square analyses confirmed the hypothesis of a positive and significant relationship between appointment adherence and positive voice tone ratings (p=.03) but not longer visit length and more patient-centered communication. The nonverbal conveyance of positive affect was associated with greater adherence to medication management appointments by depressed patients. These findings potentially have important implications for communication skills training and adherence research.

  11. "Nudge" and the epidemic of missed appointments.

    Science.gov (United States)

    Aggarwal, Ajay; Davies, Joanna; Sullivan, Richard

    2016-06-20

    Purpose - Missed appointments constitute a significant problem in the UK National Health Service (NHS) and this remains an area where improvements could yield substantial efficiency savings. The purpose of this paper is to suggest that nudge policies based on behavioural theories may help target interventions to improve patient motivation to attend appointments. Design/methodology/approach - The authors propose two policies to reduce missed appointments. The first attempts to empower patients through making the appointment system more individualised to them and utilising their intrinsic feelings of social responsibility. The second policy utilises a financial commitment given by the patient at the time of booking. The different mechanisms of influencing patient behaviour are based on two different views of what motivates individuals' actions. The first policy is based on individuals being "knights". They are altruistic and have well-intentioned values. The second policy option is constructed on the premise that an individual is governed by self-interest, and they are in fact "knaves". Findings - A policy, which avoids the use of financial penalties is likely to be more culturally acceptable within the NHS. It could also prevent the phenomenon of "crowding out" whereby the desire to act dutifully gets displaced by the motivation to avoid incurring a monetary fine. Originality/value - Testing both strategies would provide insight into patient attitudes towards health care and society. This would help optimise behavioural strategies which may influence not only appointment attendances but also have wider implications for encouraging rational health care consumption.

  12. Servant as leader: Critical requirements for the appointment and training of retirement fund trustees

    Directory of Open Access Journals (Sweden)

    L.M. Magda Hewitt

    2017-09-01

    Full Text Available Orientation: The South African retirement fund industry ranks among the 15 largest retirement fund industries internationally, with some 8 million members and assets under management of close to R2 trillion. However, to be successful, retirement funds need good governance. Research purpose: To explore the most critical servant leadership qualities required that can serve as profile in the selection, appointment and training of retirement fund trustees (RFTs to serve on boards of trustees of retirement funds in the South African context. Motivation for the study: The South African National Treasury’s retirement reform proposal clearly articulates government’s concern for the poor governance of retirement fund assets by appointed boards of trustees and the broader implications on social and economic security in retirement. It promotes the regulation of standards relating to the minimum qualifications and expertise needed to be appointed to serve on a board of trustees (BoTs. Although the measures proposed by government to improve fund governance and the role of the RFTs are sound in principle, it does not inform the character, leadership qualities or leadership competence desired for RFTs, thus leaving the management of funds in the hands of people who must make investment decisions when they themselves are not fully committed. Research design, approach and method: The research question was addressed through an extensive literature review and a qualitative methodology using a semi-structured interview; fieldwork that included personal observations; and notes with six active, high-profile, respected, purposefully selected RFTs. An interpretive approach was adopted to provide elaborative interpretations of phenomena without having to rely on numerical measurement. Main findings: A strong similitude exists between servant leader qualities, as found in the literature, and those qualities identified and required to be appointed as a RFT. Literature

  13. The Development Needs of Newly Appointed Senior School Leaders in the Western Cape South Africa: A Case Study

    Directory of Open Access Journals (Sweden)

    Nelius Jansen van Vuuren

    2017-12-01

    Full Text Available The essential role that senior school leaders play in school leadership teams to ensure effective strategic leadership in schools has been the subject of intense discussion for many years. Crucial to this debate is the establishment of professional learning and leadership approaches for newly appointed senior school leaders. Recommendations for policy and practice highlight the importance of appropriate, multifaceted, developmental support initiatives for newly appointed school leaders. In many countries, including South Africa, a teaching qualification and, in most cases, extensive teaching experience is the only requirement for being appointed as a senior school leader in a school. This tends to suggest that no further professional development is required for newly appointed school leaders, the problem addressed in this paper. This paper reports on the main findings of the perceived development needs of newly appointed senior school leaders in the Western Cape, South Africa, and suggests that school leaders occupy a unique and specialist role in education, which requires relevant and specific preparation to support effective leadership. The respondents of this study report a lack of contextualised training and support before and after their appointment in their new roles creating unique development needs. This paper, therefore, employs a mixed-method approach to gather data to understand the perceived needs of twenty newly appointed senior school leaders in the Western Cape, South Africa.

  14. Qualitative Study of Foster Caregivers’ Views on Adherence to Pediatric Appointments

    Science.gov (United States)

    Schneiderman, Janet U.; Kennedy, Andrea K.; Sayegh, Caitlin S.

    2016-01-01

    The current study is a qualitative investigation of how foster caregivers, primarily Latinos, view adherence to pediatric appointments with the purpose of identifying how the child welfare system, pediatric clinics, and pediatric health providers serving foster children might promote appointment attendance. Participants in the study had a return appointment at an outpatient pediatric clinic that only served children in the child welfare system. Twenty-eight caregivers (13 related and 15 unrelated) participated in telephone interviews after the date of their scheduled pediatric appointment (32% missed their return appointment). Semistructured interview guides included general questions about what promotes attending the pediatric appointment, what makes it difficult to attend the pediatric appointment, and how pediatric care affects the foster child. Analysis of qualitative data using content analysis identified three themes: (a) multiple methods to attend appointments, which included caregivers’ organizational and problem-solving skills; (b) positive health care experiences, which consisted of caregivers’ personal relationships with providers and staff members and clinic organization; and (c) necessity of pediatric care, which included recognition of the need for health care, especially timely immunizations. All caregivers also reported that appointments reminders would be helpful. Unrelated caregivers more often said that appointment attendance was facilitated by clinic organization compared to related caregivers. Nonadherent caregivers mentioned their need to solve problems to attend appointments or reschedule appointments more than attenders. In summary, caregivers said they valued regular pediatric health care to treat their child’s chronic conditions and prevent illnesses, but they acknowledged that their home lives were hectic and attending scheduled appointments was sometimes difficult. Foster caregivers in this study identified the ideal pediatric

  15. Changing existing qualifications into outcomes-based qualifications ...

    African Journals Online (AJOL)

    Various workshops were facilitated to determine the outcomes of each level of our qualification, B Tech: Policing. This led to the formulation of a purpose statement, exit level outcomes and specific outcomes as well as assessment criteria and the critical outcomes embedded in each level identified. Using the specific ...

  16. A recommendation of the National Board for Atomic Safety and Radiation Protection for the appointment of Nuclear Safety Control Officers for research reactors

    International Nuclear Information System (INIS)

    Adler, B.

    1990-01-01

    The Ordinance on the Implementation of Atomic Safety and Radiation Protection of the GDR requires that the managers of plants where nuclear facilities are operated appoint Control Officers for the fields of radiation protection, nuclear safety, physical protection, and accounting for and control of nuclear materials. The Control Officers are staff members of the operating organization but their appointment is subject to approval by the National Board and requires adequate qualification. The main task of the Control Officers as specialists is to give advice to the plant manager who retains responsibility for the safety of nuclear facilities, and to verify on his behalf that all requirements within their competence are met by the operating group. For this reason the Control Officer has to be absolutely independent of the head of the operating group. To enable the Control Officers to accomplish all necessary control activities and to guarantee independence from the head of the operating group, the plant manager has to establish adequate regulations of operation. As a pattern for such regulations the National Board has issued a Recommendation for the Appointment of Nuclear Safety Control Officers for Research Reactors, which provides a comprehensive survey of the requisite qualification features as well as the duties and rights of these Control Officers. This recommendation will be dealt with in the presentation

  17. Predicting appointment breaking.

    Science.gov (United States)

    Bean, A G; Talaga, J

    1995-01-01

    The goal of physician referral services is to schedule appointments, but if too many patients fail to show up, the value of the service will be compromised. The authors found that appointment breaking can be predicted by the number of days to the scheduled appointment, the doctor's specialty, and the patient's age and gender. They also offer specific suggestions for modifying the marketing mix to reduce the incidence of no-shows.

  18. Nuclear energy electricity technical regulation on the qualification

    International Nuclear Information System (INIS)

    1995-01-01

    It tells the range of application purpose and of the qualification. It describes how to qualify of the class 1 E equipment, which are type test, operating experience, analysis and combined method. Next it deals with qualification procedure, which are specification requirement, requirement of qualification program, type testing, operating experience, analysis and combined qualification, acceptance criteria modification and extension with qualified life, simulated test profiles and document about type test data, operating experience data and extrapolation.

  19. Qualification Practices in Nuclear Industry: Steam Generator Eddy Current Probe Qualification

    International Nuclear Information System (INIS)

    Vavrous, M.; Gracin, R.

    2010-01-01

    Through history of nuclear power plant operation, a large number of nuclear power plant forced outages related to tube failures occurred. It resulted with large amount of repair and outage costs, what initiated implementation of regulated practice of periodical tube examination and tube condition monitoring. Purpose of examinations is to detect existing or potential tube degradations that could affect tube integrity and therefore result in forced outages and unwanted costs related to emergency repair activities and loss of ability for electrical power production. With increased examination activities, additional information about steam generator tube condition became available and additional methods for ensuring tube integrity became available. As the number of examination solutions increased, need for validation and assessment of examination methods occurred. For that purpose, a large number of standards and guidelines with its requirements were implemented in nuclear industry regulatory requirements to ensure that adequately validated examinations are applied. With this purpose, qualification requirements for inspection activities were implemented with other requirements. With progress of technology, progress was also achieved in examination methods and more advanced examination methods and advanced inspection systems were developed. This advancement is accompanied by advancement in regulatory requirements regarding inspection and monitoring of tube integrity and condition. Ultimate goal of implementation of qualification processes and its requirements in all aspects of nuclear industry is to achieve minimal rate of forced outages, which would ensure maximum electrical power production capabilities and maximum optimization of operational costs while maintaining safe operation in accordance with environmental policies. This article will focus on qualification of steam generator eddy current bobbin probe.(author).

  20. Scientific profile and professional responsibility of Court-appointed Medical Technical Consultants in Italy: time for a specific educational curriculum?

    Science.gov (United States)

    Conti, Andrea Alberto

    2014-08-20

    Court-appointed Technical Consultants (CTCs) are fundamental figures in the Italian judicial system. CTCs are experts appointed by judges in order to supplement their activities by ascertaining, collecting and analyzing facts concerning the specific subject of a lawsuit. These experts formulate opinions, gather motivations and perform checks to provide clear, objective and irrefutable answers to the questions posed by judges. With direct reference to the medical field, while police doctors (specialists in forensic medicine) follow an academic, dedicated, well-structured educational curriculum, the University specialty school in Forensic Medicine, other medical CTCs, though not infrequently luminaries with one or many medical specialties and professional acknowledgments, may have no specific legal-medicine and juridical expertise, precisely because a similar expertise is not formally required of them. In the light of these considerations, in Italy some professionals of the legal world, and of the health context too, have proposed for medical CTCs targeted educational pathways, which would provide these experts with formal specific qualifications. In synthesis and in conclusion, a full knowledge and a rigorous respect of the rules of legal proceedings emerge as increasingly important characteristics for current and future Court-appointed Technical Consultants, together with a specific educational curriculum.

  1. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting engineer within the provisions of subpart O of this part, for the purpose of operating a steam-driven hoist...

  2. Appointment breaking: causes and solutions.

    Science.gov (United States)

    Bean, A G; Talaga, J

    1992-12-01

    From a review of research on health care appointment breaking, the authors find that patient demographic characteristics, psychosocial problems, previous appointment keeping, health beliefs, and situational factors predict no-show behavior. Suggestions are offered for designing the marketing mix to increase patient appointment keeping. Methods for mitigating the negative effects of no-shows on health care providers are described.

  3. Email for the coordination of healthcare appointments and attendance reminders.

    Science.gov (United States)

    Atherton, Helen; Sawmynaden, Prescilla; Meyer, Barbara; Car, Josip

    2012-08-15

    Email is a popular and commonly-used method of communication, but its use in health care is not routine. Where email communication has been utilised in health care, its purposes have included the coordination of healthcare appointments and attendance reminders, but the effects of using email in this way are not known. This review considers the use of email for the coordination of healthcare appointments and reminders for attendance; particularly scheduling, rescheduling and cancelling healthcare appointments, and providing prompts/reminders for attendance at appointments. To assess the effects of using email for the coordination of healthcare appointments and attendance reminders, compared to other forms of coordinating appointments and reminders, on outcomes for health professionals, patients and carers, and health services, including harms. We searched: the Cochrane Consumers and Communication Review Group Specialised Register, the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 1 2010), MEDLINE (OvidSP) (1950 to January 2010), EMBASE (OvidSP) (1980 to January 2010), PsycINFO (OvidSP) (1967 to January 2010), CINAHL (EbscoHOST) (1982 to February 2010),and ERIC (CSA) (1965 to January 2010). We searched grey literature: theses/dissertation repositories, trials registers and Google Scholar (searched July 2010). We used additional search methods: examining reference lists and contacting authors. Randomised controlled trials, quasi-randomised trials, controlled before and after studies and interrupted time series studies of interventions that use email for scheduling health appointments, for reminders for a scheduled health appointment or for ongoing coordination of health appointments and that took the form of 1) unsecured email 2) secure email or 3) web messaging. All healthcare professionals, patients and caregivers in all settings were considered. Two review authors independently assessed the titles and abstracts of retrieved

  4. 38 CFR 13.55 - Veterans Service Center Manager to select and appoint or recommend for appointment the person or...

    Science.gov (United States)

    2010-07-01

    ... Manager to select and appoint or recommend for appointment the person or legal entity to receive....55 Veterans Service Center Manager to select and appoint or recommend for appointment the person or.... The Veterans Service Center Manager is authorized to select and appoint (or in the case of a court...

  5. 12 CFR 231.3 - Qualification as a financial institution.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Qualification as a financial institution. 231.3... RESERVE SYSTEM NETTING ELIGIBILITY FOR FINANCIAL INSTITUTION (REGULATION EE) § 231.3 Qualification as a financial institution. (a) A person qualifies as a financial institution for purposes of sections 401-407 of...

  6. Enhanced Leads and Appointment System

    Data.gov (United States)

    Social Security Administration — The data asset contains information on current or upcoming appointments, individuals who will be attending the appointment, potential intent to file a claim (lead),...

  7. Helicopter-Ship Qualification Testing

    NARCIS (Netherlands)

    Hoencamp, A.

    2015-01-01

    The goal of this research project is to develop a novel test methodology which can be used for optimizing cost and time efficiency of helicopter-ship qualification testing without reducing safety. For this purpose, the so-called “SHOL-X” test methodology has been established, which includes the

  8. Software qualification of selected TOUGH2 modules

    International Nuclear Information System (INIS)

    Wu, Y.S.; Ahlers, C.F.; Fraser, P.; Simmons, A.; Pruess, K.

    1996-10-01

    The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of the single-phase Gas (EOS1G), Effective Continuum Method (ECM), Saturated/Unsaturated Flow (EOS9), and Radionuclide Transport (T2R3D) modules of TOUGH2, a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. This report contains the following sections: (1) Requirements Specification, (2) Design Description, (3) Software Validation Test Plan and Report, (4) Software User Documentation, and (5) Appendices. These sections comprise sequential parts of the Software Life Cycle, and are not intended to stand alone but should be used in conjunction with the TOUGH User's Guide (Pruess, 1987), TOUGH2--A General Purpose Numerical Simulator for Multiphase Fluid and Heat Flow (Pruess, 1991), and the above-referenced TOUGH2 software qualification document. The qualification package is complete with the attached Software Identification Form and executable source code for the single-phase Gas, Effective Continuum method, Saturated/Unsaturated Flow, and Radionuclide Transport modules of TOUGH2

  9. Global National Qualifications Framework Inventory: Country Cases from EU and ETF Partner Countries

    Science.gov (United States)

    Cedefop - European Centre for the Development of Vocational Training, 2013

    2013-01-01

    Certificates, diplomas and titles are commonly known as qualifications. Their purpose is to show employers, training providers, and individuals what the person holding the qualification has learned and can do. Every country issues many different qualifications, but for the European labor market to work as intended--that is for European citizens to…

  10. 5 CFR 316.402 - Procedures for making temporary appointments.

    Science.gov (United States)

    2010-01-01

    ... appointments. Such appointments are not VRA appointments and do not lead to conversion to career-conditional appointment; (3) Career-conditional appointment under § 315.601, 315.604, 315.605, 315.606, 315.607, 315.608... the General Accounting Office; (6) Appointment under 28 U.S.C. 602 for current and former employees of...

  11. 32 CFR 74.1 - Purpose.

    Science.gov (United States)

    2010-07-01

    ... DOCTORS OF OSTEOPATHY AS MEDICAL OFFICERS § 74.1 Purpose. The purpose of this part is to implement the provisions of Pub. L. 763, 84th Congress (70 Stat. 608), relating to the appointment of doctors of osteopathy...

  12. Getting patients in the door: medical appointment reminder preferences.

    Science.gov (United States)

    Crutchfield, Trisha M; Kistler, Christine E

    2017-01-01

    Between 23% and 34% of outpatient appointments are missed annually. Patients who frequently miss medical appointments have poorer health outcomes and are less likely to use preventive health care services. Missed appointments result in unnecessary costs and organizational inefficiencies. Appointment reminders may help reduce missed appointments; particular types may be more effective than other types. We used a survey with a discrete choice experiment (DCE) to learn why individuals miss appointments and to assess appointment reminder preferences. We enrolled a national sample of adults from an online survey panel to complete demographic and appointment habit questions as well as a 16-task DCE designed in Sawtooth Software's Discover tool. We assessed preferences for four reminder attributes - initial reminder type, arrival of initial reminder, reminder content, and number of reminders. We derived utilities and importance scores. We surveyed 251 adults nationally, with a mean age of 43 (range 18-83) years: 51% female, 84% White, and 8% African American. Twenty-three percent of individuals missed one or more appointments in the past 12 months. Two primary reasons given for missing an appointment include transportation problems (28%) and forgetfulness (26%). Participants indicated the initial reminder type (21%) was the most important attribute, followed by the number of reminders (10%). Overall, individuals indicated a preference for a single reminder, arriving via email, phone call, or text message, delivered less than 2 weeks prior to an appointment. Preferences for reminder content were less clear. The number of missed appointments and reasons for missing appointments are consistent with prior research. Patient-centered appointment reminders may improve appointment attendance by addressing some of the reasons individuals report missing appointments and by meeting patients' needs. Future research is necessary to determine if preferred reminders used in practice

  13. Technical evaluation of seismic qualification of safety-related equipment

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yang Hui; Park, Heong Gee; Park, Yeong Seok [Univ. of Incheon, Incheon (Korea, Republic of)

    1994-04-15

    This study is purposed to evaluate the technical acceptability of the procedures and techniques of seismic qualifications which were performed for the YGN 3 and 4 safety-related equipment.This study is also targeted to suggest a systematized technical procedure guide for the effective performance and review of the seismic qualification, which reflects the most up-to-date licensing requirements and state-of the-art.

  14. Self-management model in the scheduling of successive appointments in rheumatology.

    Science.gov (United States)

    Castro Corredor, David; Cuadra Díaz, José Luis; Mateos Rodríguez, Javier José; Anino Fernández, Joaquín; Mínguez Sánchez, María Dolores; de Lara Simón, Isabel María; Tébar, María Ángeles; Añó, Encarnación; Sanz, María Dolores; Ballester, María Nieves

    2018-01-08

    The rheumatology service of Ciudad Real Hospital, located in an autonomous community of that same name that is nearly in the center of Spain, implemented a self-management model of successive appointments more than 10 years ago. Since then, the physicians of the department schedule follow-up visits for their patients depending on the disease, its course and ancillary tests. The purpose of this study is to evaluate and compare the self-management model for successive appointments in the rheumatology service of Ciudad Real Hospital versus the model of external appointment management implemented in 8 of the hospital's 15 medical services. A comparative and multivariate analysis was performed to identify variables with statistically significant differences, in terms of activity and/or performance indicators and quality perceived by users. The comparison involved the self-management model for successive appointments employed in the rheumatology service of Ciudad Real Hospital and the model for external appointment management used in 8 hospital medical services between January 1 and May 31, 2016. In a database with more than 100,000 records of appointments involving the set of services included in the study, the mean waiting time and the numbers of non-appearances and rescheduling of follow-up visits in the rheumatology department were significantly lower than in the other services. The number of individuals treated in outpatient rheumatology services was 7,768, and a total of 280 patients were surveyed (response rate 63.21%). They showed great overall satisfaction, and the incidence rate of claims was low. Our results show that the self-management model of scheduling appointments has better results in terms of activity indicators and in quality perceived by users, despite the intense activity. Thus, this study could be fundamental for decision making in the management of health care organizations. Copyright © 2017 Elsevier España, S.L.U. and Sociedad Española de

  15. Appointment scheduling on computer.

    Science.gov (United States)

    Mercando, A D

    1997-07-01

    The program is well-written, intuitive, and easy to use once initial data, such as the available appointment slots, has been entered. While the effort may not seem worthwhile initially, the ability to access an office appointment book from several locations simultaneously and the reporting capabilities of the software make MEDSched a useful addition to any busy office practice or clinic. Please send your comments and suggestions to me at adm4@columbia.edu.

  16. One-appointment endodontic therapy: biological considerations.

    Science.gov (United States)

    Lin, Louis M; Lin, Jarshen; Rosenberg, Paul A

    2007-11-01

    The authors conducted a literature review to present the best available biological evidence concerning one-appointment endodontic therapy for asymptomatic teeth with apical periodontitis. Because of recent advances in technology, such as rotary engines and nickel-titanium instruments, some practitioners are performing one-appointment endodontic therapy for asymptomatic teeth with apical periodontitis. The authors reviewed the literature, which revealed only a small number of randomized, controlled clinical trials that have been conducted on one-appointment versus multiple-appointment endodontic therapy. As the apical canal preparation is enlarged, a greater percentage of bacteria is eradicated from infected root canals. In addition, sufficiently large apical root canal enlargement facilitates the delivery of antimicrobial irrigant to the apical portion of the canal. However, an association between positive or negative preobturation root canal culture results and the outcome of endodontic treatment has not been well-established. The best available evidence, based on a systematic literature review, indicates that one-appointment endodontic therapy may be feasible in selected cases of apical periodontitis in asymptomatic teeth. However, additional randomized, controlled clinical trials are required.

  17. 25 CFR 11.610 - Appointment of guardians.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Appointment of guardians. 11.610 Section 11.610 Indians... ORDER CODE Domestic Relations § 11.610 Appointment of guardians. The court shall have the jurisdiction to appoint or remove legal guardians for minors and for persons who are incapable of managing their...

  18. Patients’ Perspective on the Value of Medication Management Appointments

    Directory of Open Access Journals (Sweden)

    Mario Cruz

    2015-05-01

    Full Text Available Objectives: There is ongoing concern that psychiatric medication management appointments add little value to care. The present study attempted to address this concern by capturing depressed patients’ views and opinions about the value of psychiatric medication management appointments. Methods: Seventy-eight semi-structured interviews were performed with white and African American depressed patients post medication management appointments. These interviews tapped patients’ views and opinions about the value of attending medication management appointments. Analysis: An iterative thematic analysis was performed. Findings: Patients reported greater appointment value when appointments included obtaining medications, discussing the need for medication changes or dose adjustments, and discussing the impact of medications on their illness. Additionally, greater appointment value was perceived by patients when there were non-medical conversations about life issues, immediate outcomes from the appointment such as motivation to continue in care, and specific qualities of providers that were appealing to patients. Conclusions: Patients’ perceived value of psychiatric medication management appointments is complex. Though important patient outcomes are obtaining medicine and perceiving improvement in their mental health, there are other valued appointment and provider factors. Some of these other valued factors embedded within medication management appointments could have therapeutic properties. These findings have implications for future clinical research and service delivery.

  19. Significant Factors Related to Failed Pediatric Dental General Anesthesia Appointments at a Hospital-based Residency Program.

    Science.gov (United States)

    Emhardt, John R; Yepes, Juan F; Vinson, LaQuia A; Jones, James E; Emhardt, John D; Kozlowski, Diana C; Eckert, George J; Maupome, Gerardo

    2017-05-15

    The purposes of this study were to: (1) evaluate the relationship between appointment failure and the factors of age, gender, race, insurance type, day of week, scheduled time of surgery, distance traveled, and weather; (2) investigate reasons for failure; and (3) explore the relationships between the factors and reasons for failure. Electronic medical records were accessed to obtain data for patients scheduled for dental care under general anesthesia from May 2012 to May 2015. Factors were analyzed for relation to appointment failure. Data from 3,513 appointments for 2,874 children were analyzed. Bivariate associations showed statistically significant (Pgeneral anesthesia face specific barriers to care.

  20. 46 CFR 68.7 - Qualification as an 883-1 corporation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Qualification as an 883-1 corporation. 68.7 Section 68.7... Trade § 68.7 Qualification as an 883-1 corporation. (a) To be formally qualified as an 883-1 corporation for all purposes under the Act, a corporation which meets the requirements of § 68.5 must file with...

  1. An investigation of individual functionality football referees qualifications

    Directory of Open Access Journals (Sweden)

    S.M. Berezka

    2014-12-01

    Full Text Available Purpose: determine the level of individual functionality referees qualifications. Objective of the study was to determine the physiological parameters characterizing the functionality of football referees qualifications. Material : mainly experiment involved 29 highly qualified referees aged 21-45 years. In the main experiment participated 29 referees and 40 assistant referees (n = 69 Ukrainian Premier League. Results: found that the means and methods that use Ukrainian football referee high qualification in the special physical training for a competition, are not effective enough. Consequence of poorly planned training process is to increase the number of wrong decisions of the referees during the match associated with poor motor activity. Conclusions: data obtained in the course of educational research confirmed our theory about the necessity of individualization process special physical training qualifications of referees, which would entail increasing the functional and motor abilities of the referees, and as a consequence of better and successful completion of the work.

  2. Qualification standard for photovoltaic concentrator modules

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.; Kurtz, S.; Bottenberg, W. R.; Hammond, R.; Jochums, S. W.; McDanal, A. J.; Roubideaux, D.; Whitaker, C.; Wohlgemuth, J.

    2000-05-05

    The paper describes a proposed qualification standard for photovoltaic concentrator modules. The standard's purpose is to provide stress tests and procedures to identify any component weakness in photovoltaic concentrator modules intended for power generation applications. If no weaknesses are identified during qualification, both the manufacturer and the customer can expect a more reliable product. The qualification test program for the standard includes thermal cycles, humidity-freeze cycles, water spray, off-axis beam damage, hail impact, hot-spot endurance, as well as electrical tests for performance, ground continuity, isolation, wet insulation resistance, and bypass diodes. Because concentrator module performance can not be verified using solar simulator and reference cell procedures suitable for flat-plate modules, the standard specifies an outdoor I-V test analysis allowing a performance comparison before and after a test procedure. Two options to this complex analysis are the use of a reference concentrator module for side-by-side outdoor comparison with modules undergoing various tests and a dark I-V performance check.

  3. 32 CFR 67.1 - Purpose.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR APPOINTMENT OF RESERVE COMPONENT OFFICERS TO A GRADE ABOVE FIRST LIEUTENANT OR LIEUTENANT (JUNIOR GRADE) § 67.1 Purpose. This part provides guidance for implementing policy, assigns... 32 National Defense 1 2010-07-01 2010-07-01 false Purpose. 67.1 Section 67.1 National Defense...

  4. Predicting appointment misses in hospitals using data analytics

    Science.gov (United States)

    Karpagam, Sylvia; Ma, Nang Laik

    2017-01-01

    Background There is growing attention over the last few years about non-attendance in hospitals and its clinical and economic consequences. There have been several studies documenting the various aspects of non-attendance in hospitals. Project Predicting Appoint Misses (PAM) was started with the intention of being able to predict the type of patients that would not come for appointments after making bookings. Methods Historic hospital appointment data merged with “distance from hospital” variable was used to run Logistic Regression, Support Vector Machine and Recursive Partitioning to decide the contributing variables to missed appointments. Results Variables that are “class”, “time”, “demographics” related have an effect on the target variable, however, prediction models may not perform effectively due to very subtle influence on the target variable. Previously assumed major contributors like “age”, “distance” did not have a major effect on the target variable. Conclusions With the given data it will be very difficult to make any moderate/strong prediction of the Appointment misses. That being said with the help of the cut off we are able to capture all of the “appointment misses” in addition to also capturing the actualized appointments. PMID:28567409

  5. Malaysian qualification and certification scheme for NDT personnel: achievements and steps toward harmonization in accordance with ISO 9712

    International Nuclear Information System (INIS)

    Abd Nassir Ibrahim

    2001-01-01

    Development of skilled manpower in the field of NDT is one the most important component that must be given priority in order to ensure the sustainability of the technology in any country. In this respect ISO 9712 provides a guideline on the implementation of HRD program in the field of NDT that involved training, qualification and certification processes. ISO 9712 was developed with the hope that it provided a guideline for the establishment of qualification and certification scheme acceptable to the whole NDT community throughout the world. With this guideline, the process of qualification and certification of NDT personnel of different countries throughout the world will be harmonized. In Malaysia, such a scheme was established in 1985 with the National Vocational Training Council was appointed as the Certification Body. Although the scheme was developed based on ISO 97121 some local requirement were included which made the scheme somewhat deviated from the ISO practices. Twenty years after it was first implemented, the scheme was revised and amended to ensure that requirements of ISO 9712 are complied. The new scheme was revised and approved in April 2000 and was implemented for the first time in November radiography level 1 examination. (Author)

  6. Nuclear criticality safety specialist training and qualification programs

    International Nuclear Information System (INIS)

    Hopper, C.M.

    1993-01-01

    Since the beginning of the Nuclear Criticality Safety Division of the American Nuclear Society (ANS) in 1967, the nuclear criticality safety (NCS) community has sought to provide an exchange of information at a national level to facilitate the education and development of NCS specialists. In addition, individual criticality safety organizations within government contractor and licensed commercial nonreactor facilities have developed training and qualification programs for their NCS specialists. However, there has been substantial variability in the content and quality of these program requirements and personnel qualifications, at least as measured within the government contractor community. The purpose of this paper is to provide a brief, general history of staff training and to describe the current direction and focus of US DOE guidance for the content of training and qualification programs designed to develop NCS specialists

  7. 14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...

  8. Assessment of Electro-Mechanic Technician Qualifications in the Context of European Transparency Tools

    Science.gov (United States)

    Ozcan, Mustafa; Vuranok, Turan Tolga; Ball, Claudia

    2017-01-01

    Purpose: This study explores the applicability and transferability of tools developed for the realization of comparability and transparency of qualifications across Europe. It relates to the implementation of the European Credit System for Vocational Education and Training (ECVET) and the European Qualifications Framework (EQF) in the automotive…

  9. 48 CFR 1401.603-3 - Appointment.

    Science.gov (United States)

    2010-10-01

    ... Responsibilities 1401.603-3 Appointment. Purchase card holders may be appointed in writing or in accordance with the bureau/office procedures within the constraints of DOI Integrated Charge Card Program Policy Manual located at http://www.doi.gov/pam/chargecard. Additional guidance is available in the GSA Smart...

  10. What are the qualifications and selection criteria for women to be appointed to society journal editorial boards?

    Science.gov (United States)

    Tomizawa, Yasuko

    2014-02-01

    Japan ranks extremely low in global ranking of gender equality. It is not easy for female doctors to acquire leadership positions in member societies of the Japanese Association of Medical Science (JAMS). Very few women are included on editorial boards of English medical journals in Japan. Furthermore, until last year, there had been no female editors in English language journals of surgical societies. The qualifications and criteria for selecting editorial board members of medical journals should be clarified. Medical journals in Japan would gain diversity by including women on editorial boards in the same proportion as women membership in the corresponding medical societies.

  11. Factors influencing non-attendance of clinic appointments in ...

    African Journals Online (AJOL)

    without an appointment, with an average of eight patients per day missing their appointment. The low rate of compliance with clinic appointments was of concern for the physicians at both the diabetes clinics. Prior to the current study, the reasons for non-attendance had not been examined. Materials and methods. A sample ...

  12. QUALIFICATIONS FRAMEWORK DEVELOPMENT AND QUALIFICATIONS RATING IN THE LAND MANAGEMENT SPHERE

    Directory of Open Access Journals (Sweden)

    A. A. Myrasheva

    2014-01-01

    Full Text Available The aim of the research is to observe the existing approaches to qualifications framework development in the sphere of land management, cadastres and real estate management, as well as the qualifications framework adaptation to European system. The relevance of the issue is related to the specific professional and institutional problems facing Russian educational establishments engaged in personnel training in the given sphere. The authors demonstrate the qualifications framework development in the land management sector regarding it as a key mechanism of educational mobility and the router for knowledge acquisition and updates. The qualifications framework is referred to as a systematic and structured description of recognized qualifications. The accepted worldwide methodology of organizing the educational process and quality control system is given. The emphasis is on the need to comply the qualifications framework with the Russian State Educational Standards.

  13. Inspector qualification guidelines

    International Nuclear Information System (INIS)

    Batty, A.C.; Van Binnebeek, J.J.; Ericsson, P.O.; Fisher, J.C.; Geiger, P.; Grandame, M.; Grimes, B.K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-01

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied

  14. Inspector qualification guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Batty, A. C.; Van Binnebeek, J. J.; Ericsson, P. O.; Fisher, J. C.; Geiger, P.; Grandame, M.; Grimes, B. K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-15

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied.

  15. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  16. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  17. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  18. Between the Cup and the Lip: Missed Dental Appointments.

    Science.gov (United States)

    Tandon, Sandeep; Duhan, Reena; Sharma, Meenakshi; Vasudeva, Suraj

    2016-05-01

    Missed appointments are an issue which have been very commonly noticed but overlooked in Indian dental society. Almost every dentist, general or specialized, private or public, has faced this problem in routine practice but very less research has been conducted on this issue in Asian countries. The aim of this study was to determine the frequency and distribution of missed dental appointments among children and the reasons behind the non-attendance in department of paediatric and preventive dentistry. Patients under 15 years of age who reported during the period March through August 2014 were included in this study. Attendance data and demographical data for patients was obtained from patient records and the hospital database. The type of treatment patients were to receive was gathered from the appointment diaries of staff, postgraduate students and undergraduates. A structured questionnaire regarding the most frequent reasons given by patients for not attending the scheduled appointment was also prepared. The data were analysed using descriptive analysis. Of the total 2294 patients 886 patients failed to come on their scheduled appointment. Percentage of patients who missed their appointments was 38.6%. A 38.2% of them required primary teeth pulp therapy. No significant differences was found between genders regarding the prevalence of missed dental appointments. Only 40% dentist witnessed that the most common reason for their patients to miss dental appointment was "no leave from school". Illness was the second frequent excuse heard by dentists (5/20= 25%) from their patients and attendants. Missed dental appointment was found to be a common issue in paediatric age group. Counseling and motivation is required to be done at first dental visit to reduce the chances of missed appointment.

  19. Investor Response to Appointment of Female CEOs and CFOs

    NARCIS (Netherlands)

    Scholtens, Lambertus; Brinkhuis, Eline

    2018-01-01

    We study the impact of appointing women to top executive positions from an investor perspective. We analyze whether shareholders value announcement of appointment of women to top positions differently than they do appointment of men. This study uses an international sample of 100 announcements of

  20. Hybrid Qualifications

    DEFF Research Database (Denmark)

    Against the background of increasing qualification needs there is a growing awareness of the challenge to widen participation in processes of skill formation and competence development. At the same time, the issue of permeability between vocational education and training (VET) and general education...... has turned out as a major focus of European education and training policies and certainly is a crucial principle underlying the European Qualifications Framework (EQF). In this context, «hybrid qualifications» (HQ) may be seen as an interesting approach to tackle these challenges as they serve «two...

  1. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    Energy Technology Data Exchange (ETDEWEB)

    Chang, C.K., E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of); Lee, K.J., E-mail: klee@khu.ac.kr [Kyung Hee Univ., Seoul (Korea, Republic of)

    2014-07-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  2. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    International Nuclear Information System (INIS)

    Chang, C.K.; Lee, K.J.

    2014-01-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  3. Behavioral changes during dental appointments in children having tooth extractions

    Directory of Open Access Journals (Sweden)

    Mariana Gonzalez Cademartori

    2017-01-01

    Full Text Available Background: Tooth extractions are associated with anxiety-related situations that can cause behavioral problems in pediatric dental clinics. Aim: We aimed to describe the behavior of children during tooth extraction appointments, compare it to their behavior in preceding and subsequent dental appointments, and assess the behavioral differences according to gender, age, type of dentition, and reason for extraction. Settings and Design: This was a retrospective study based on information obtained from records of children between 6 and 13 years of age who were cared for at the Dentistry School in Pelotas, Brazil. Materials and Methods: Child behavior was assessed during the dental appointment that preceded the tooth extraction, during the tooth extraction appointment, and in the subsequent dental appointment using the Venham Behavior Rating Scale. Statistical Analysis: Results were analyzed using the Pearson Chi-square and McNemar tests. Results: Eighty-nine children were included. Cooperative behavior prevailed in all the dental appointments. The prevalence of “mild/intense protest” was higher in the tooth extraction appointments than in the previous or subsequent dental appointments (P < 0.001. No significant differences in behavior were detected between the type of dentition (primary or permanent teeth, reason for extraction or gender. Conclusion: In this sample of children treated at a dental school, the occurrence of uncooperative behavior was higher during the tooth extraction appointments than in the preceding and subsequent dental appointments.

  4. The recertification of the professional accounting qualification in Estonia: the requirements and quality of CPD

    Directory of Open Access Journals (Sweden)

    Kaidi Kallaste

    2017-09-01

    Full Text Available The recertification of the professional accounting qualification in Estonia: the requirements and quality of CPD As the purpose of a professional qualification should be to ensure quality to employers/customers, appro-priate requirements for professional training should not be too low. On the other hand, too high require-ments for the amount of training would lead to the situation where maintaining the level is expensive and if the labour market does not consider having a professional certificate necessary, recertification will be discarded. The purpose of the research was to identify the factors that influence an accountant’s decision whether to recertify his/her professional qualification or not. The conditions of recertification were ana-lysed and compared to other countries as were the requirements set up for auditors. The results of the survey revealed that in Estonia the decision not to recertify one’s professional qualification was mainly due to not having fulfilled the required number of qualification hours or not having certificates proving one’s participation in qualification training sessions. At the same time, compared to other countries, the requirements in Estonia are very low. So that the increase in the amount of training would not hinder recertification, alternative solutions for Estonia are proposed in the article.

  5. 48 CFR 245.7001 - Selection, appointment, and termination.

    Science.gov (United States)

    2010-10-01

    ... REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Appointment of Property... officers, the appointment authority shall consider experience, training, education, business acumen, judgment, character, and ethics. ...

  6. Audiologist-patient communication profiles in hearing rehabilitation appointments.

    Science.gov (United States)

    Meyer, Carly; Barr, Caitlin; Khan, Asaduzzaman; Hickson, Louise

    2017-08-01

    To profile the communication between audiologists and patients in initial appointments on a biomedical-psychosocial continuum; and explore the associations between these profiles and 1) characteristics of the appointment and 2) patients' decisions to pursue hearing aids. Sixty-three initial hearing assessment appointments were filmed and audiologist-patient communication was coded using the Roter Interaction Analysis System. A hierarchical cluster analysis was conducted to profile audiologist-patient communication, after which regression modelling and Chi-squared analyses were conducted. Two distinct audiologist-patient communication profiles were identified during both the history taking phase (46=biopsychosocial profile, 15=psychosocial profile) and diagnosis and management planning phase (45=expanded biomedical profile, 11=narrowly biomedical profile). Longer appointments were significantly more likely to be associated with an expanded biomedical interaction during the diagnosis and management planning phase. No significant associations were found between audiologist-patient communication profile and patients' decisions to pursue hearing aids. Initial audiology consultations appear to remain clinician-centred. Three quarters of appointments began with a biopsychosocial interaction; however, 80% ended with an expanded biomedical interaction. Findings suggest that audiologists could consider modifying their communication in initial appointments to more holistically address the needs of patients. Copyright © 2017 Elsevier B.V. All rights reserved.

  7. Novel qualification methodology for subsea processing

    Energy Technology Data Exchange (ETDEWEB)

    Nilsen, Paal Jahre; Bratfos, Hans A. [Det Norske Veritas, Oslo (Norway)

    2004-07-01

    The purpose of the Reliability Analysis is to quantify the overall reliability of the technology to confirm that the functional requirements and the target reliability laid down in the Qualification Basis are met. On this basis DNV may issue a Statement of Fitness for Service affirming that the technology is considered qualified. Although a technology may be convincingly proven fit for service without using reliability measures, a quantified reliability makes the technology more competitive in a business where profitability is directly related to the reliability of the technology. In this respect it should also be noted that a reliability analysis require specific input data that sometimes must be derived by testing. It is therefore important to take this into consideration already in the selection and planning of qualification methods. (author)

  8. 25 CFR 11.706 - Appointment and duties of appraiser.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Appointment and duties of appraiser. 11.706 Section 11... OFFENSES AND LAW AND ORDER CODE Probate Proceedings § 11.706 Appointment and duties of appraiser. (a) Upon ordering an estate to be probated, the court shall appoint a disinterested and competent person as an...

  9. 5 CFR 9901.501 - Purpose.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Purpose. 9901.501 Section 9901.501 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT... procedures for the recruitment for, and appointment to, positions; and assignment, reassignment, detail...

  10. Australian Qualifications Framework Lower-Level Qualifications: Pathways to Where for Young People?

    Science.gov (United States)

    Stanwick, John

    2005-01-01

    This study investigates where certificate I and II qualifications lead young people aged 15-24 years in terms of employment and further study. A prime motivation for young people undertaking these qualifications is to facilitate transition into the labour market. These qualifications are aimed at developing basic vocational skills or preparatory…

  11. Aircraft impact qualification of RBMK systems and components. Technical report. Rev. 00, May 1999

    International Nuclear Information System (INIS)

    1999-01-01

    In the present report, the problem of qualification procedures of electrical equipment with respect to the dynamic excitation subsequent to an aircraft impact (ACC) on a Nuclear Power Plant (NPP) is approached, within the context of IAEA Benchmark on vulnerability of equipment and structures of RBMK-type NPP against the aircraft impact. After a short description of the main objectives of the work and the relevant area of concern (Chapter 1), the safety related equipment more commonly installed in a NPP are grouped in few classes, according to widely accepted classification criteria and the relevant failure modes are described (Chapter 2). Taking as reference a deeply studied RBMK reactor (Ignalina NPP), an overview of its main characteristics and of the equipment ensemble housed in is given in Chapter 3. An overview of the worldwide most used qualification standards for safety related equipment for NPPs is reported in Chapter 4, and a comparison of the practices used in Europe for the qualification of safety related electrical and I and C equipment is described with special attention to seismic and impact qualification (Chapter 5). In the hypothesis that the equipment to qualify against impact excitation has been already qualified against seismic excitation, the problems relevant to the different nature of earthquake and shock phenomena are listed, together with the main criteria to implement a procedure which, based on standardized shock pulses, could be applied for ACC qualification purposes (Chapter 6). Consequently, a possible ACC qualification procedure is outlined (Chapter 7) and the interface data (data coming from numerical analysis and seismic qualification, to be used for ACC qualification purposes) are listed (Chapter 8). Finally, the main conclusions of the work are described (Chapter 9). The main references are listed in Chapter 10. (author)

  12. Appointment Template Redesign in a Women's Health Clinic Using Clinical Constraints to Improve Service Quality and Efficiency.

    Science.gov (United States)

    Huang, Y; Verduzco, S

    2015-01-01

    Patient wait time is a critical element of access to care that has long been recognized as a major problem in modern outpatient health care delivery systems. It impacts patient and medical staff productivity, stress, quality and efficiency of medical care, as well as health-care cost and availability. This study was conducted in a Women's Health Clinic. The objective was to improve clinic service quality by redesigning patient appointment template using the clinical constraints. The proposed scheduling template consisted of two key elements: the redesign of appointment types and the determination of the length of time slots using defined constraints. The re-classification technique was used for the redesign of appointment visit types to capture service variation for scheduling purposes. Then, the appointment length was determined by incorporating clinic constraints or goals, such as patient wait time, physician idle time, overtime, finish time, lunch hours, when the last appointment was scheduled, and the desired number of appointment slots, to converge the optimal length of appointment slots for each visit type. The redesigned template was implemented and the results indicated a 73% reduction in average patient waiting from the reported 40 to 11 minutes. The patient no-show rate was reduced by 4% from 24% to 20%. The morning section on average finished about 11:50 am. The clinic day was finished around 4:45 pm. Provider average idle time was estimated to be about 5 minutes, which can be used for charting/documenting patients. This study provided an alternative method of redesigning appointment scheduling templates using only the clinical constraints rather than the traditional way that required an objective function. This paper also documented the employed methods step by step in a real clinic setting. The implementation results concluded a significant improvement on patient wait time and no-show rate.

  13. 39 CFR 5.1 - Establishment and appointment.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Establishment and appointment. 5.1 Section 5.1 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE COMMITTEES (ARTICLE V) § 5.1 Establishment and appointment. From time to time the Board may establish by resolution...

  14. Recent developments in methodology for dynamic qualification of nuclear plant equipment

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-01-01

    Dynamic qualification of nuclear plant electrical and mechanical equipment is performed basically under guidelines given in IEEE Standards 323 and 344, and a variety of NRC regulatory guides. Over the last fifteen years qualification methodology prescribed by these documents has changed significantly as interpretations, equipment capability, and imagination of the qualification engineers have progressed. This progress has been sparked by concurrent NRC and industry sponsored research programs that have identified anomalies and developed new methodologies for resolving them. Revisions of the standards have only resulted after a lengthy debate of all such new information and subsequent judgment of its validity. The purpose of this paper is to review a variety of procedural improvements and developments in qualification methodology that are under current consideration as revisions to the standards. Many of the improvements and developments have resulted from recent research programs. All are very likely to appear in one type of standard or another in the near future

  15. Managing patient demand: a qualitative study of appointment making in general practice.

    Science.gov (United States)

    Gallagher, M; Pearson, P; Drinkwater, C; Guy, J

    2001-04-01

    Managing patients' requests for appointments is an important general practice activity. No previous research has systematically observed how patients and receptionists negotiate appointments. To observe appointment making and investigate patients' and professionals' experiences of appointment negotiations. A qualitative study using participant observation. Three general practices on Tyneside; a single-handed practice, a practice comprising three doctors, and a seven-doctor practice. Participant observation sessions, consisting of 35 activity recordings and 34 periods of observation and 38 patient and 15 professional interviews, were set up. Seven groups of patients were selected for interview. These included patients attending an 'open access' surgery, patients who complained about making an appointment, and patients who complimented the receptionists. Appointment making is a complex social process. Outcomes are dependent on the process of negotiation and factors, such as patients' expectations and appointment availability. Receptionists felt that patients in employment, patients allocated to the practice by the Health Authority, and patients who did not comply with practice appointment rules were most demanding. Appointment requests are legitimised by receptionists enforcing practice rules and requesting clinical information. Patients volunteer information to provide evidence that their complaint is appropriate and employ strategies, such as persistence, assertiveness, and threats, to try and persuade receptionists to grant appointments. Appointment making is a complex social process where outcomes are negotiated. Receptionists have an important role in managing patient demand. Practices should be explicit about how appointments are allocated, including publishing practice criteria.

  16. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

      When, in a competitive sphere, people are selected on the basis of qualifications only, their chances of acquiring positions of advantage may seem to depend entirely upon their abilities, not discriminatory bias. However, if reaction qualifications - i.e. characteristics which contribute...... to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... of merit. Specifically, it preserves symmetry between negative evaluations of antimeritocratic bases of selection and negative evaluations of qualifications rooted in comparable antimeritocratic reactions. So if employers should not select among applicants on the basis of their (the employers') racial...

  17. 5 CFR 317.503 - Probationary period.

    Science.gov (United States)

    2010-01-01

    .... (b) When a career appointee's executive qualification have been certified by a Qualifications Review... THE SENIOR EXECUTIVE SERVICE Career Appointments § 317.503 Probationary period. (a) An individual's initial appointment as an SES career appointee becomes final only after the individual has served a 1-year...

  18. The Humanitarian Action Qualifications Framework: a quality assurance tool for the Humanitarian Sector

    Directory of Open Access Journals (Sweden)

    Bastiaan L. Aardema

    2014-07-01

    Full Text Available The article presents the European Universities on Professionalisation on Humanitarian Action (EUPRHA Project as an initiative that seeks to contribute to the professionalisation and quality assurance of the humanitarian sector. Its purpose is to explain the approach and the process leading to the development of the Humanitarian Action Qualifications Framework as an example of good practice for other sectors aiming at improving the recognition of qualifications as a precondition of academic and professional mobility. With this aim, it introduces the educational and humanitarian trends that led to this project: the move from transnational qualifications frameworks of which the European Qualifications Framework for Lifelong Learning (EQF is the best example to sectoral qualifications frameworks and the increasing demand from the sector seeking to determine the competencies and required skills of a professional humanitarian aid worker. Based on the EQF and the Tuning methodology the framework will act as a translating device to make national and sectoral qualifications more readable and promote humanitarian workers’ and learners’ mobility between countries and organisations. It will facilitate inter-system transparency and recognition of (non-formal and informal learning by linking occupations, skills, competences, and qualifications, thus benefiting the Humanitarian Sector as a whole.

  19. Appointment attendance at a remote rural dental training facility in Australia.

    Science.gov (United States)

    Lalloo, Ratilal; McDonald, Jenny M

    2013-08-02

    Non-attended appointments have impacts on the operations of dental clinics. These impacts vary from lost productivity, loss of income and loss of clinical teaching hours. Appointment data were analysed to assess the percentage of completed, failed to attend (FTA) and cancelled appointments at an Australian remote rural student dental clinic training facility. The demographic and time characteristics of FTA and cancelled appointments were analysed using simple and multivariate multinomial regression analysis, to inform interventions that may be necessary. Over the 2-year study period a total of 3,042 appointments were made. The percentage of FTA was 21.3% (N = 648) and cancelled appointments 13.7% (N = 418). The odds of an FTA were in excess of 4 times higher in patients aged 19-25 years (OR = 4.1; 95% CI = 2.3-7.3) and 26-35 years (OR = 4.4; 95% CI = 2.5-7.9) compared to patients 65 years and older. The odds of an FTA was 2.3 (95% CI = 1.8-3.1) times higher in public patients compared to private patients. The odds of a cancellation was 1.7 (95% CI = 1.1-2.6) times higher on a Friday compared to a Monday and 1.8 (95% CI = 1.1-2.9) times higher on the last appointment of the day compared to the first appointment. For cancelled appointments, 71.3% were cancelled on the day of the appointment and 16.6% on the day before. Non-attended appointments (FTA or cancelled) were common at this remote rural dental clinic training facility. Efforts to reduce these need to be implemented; including telephonic reminders, educating the community on the importance of attending their appointments, block booking school children and double booking or arranging alternative activities for the students at times when non-attendance is common.

  20. 26 CFR 25.2514-1 - Transfers under power of appointment.

    Science.gov (United States)

    2010-04-01

    ... power of appointment. (a) Introductory. (1) Section 2514 treats the exercise of a general power of... section also treats as a transfer of property the exercise or complete release of a general power of... power of appointment is not treated as a general power of appointment merely by reason of the fact that...

  1. On appointment of Courts presidents - some open questions

    Directory of Open Access Journals (Sweden)

    Mijo Galiot

    2014-01-01

    Full Text Available In their paper, the authors analyse the legal position of the judiciary within the framework of the separation of powers in the Republic of Croatia, as well as the procedure of the election of the members and president, and the scope and manner of operation of the State Judiciary Council on a principal level. The authors especially deal with and analyse the 2010 constitutional changes and the State Judiciary Council Act from 2010 (SJCA, which introduced significant novelties in the appointment of presidents of courts in the normative and institutional sense as well as in practical applications. Separately, an integral historical overview is given of the appointment of presidents of courts from the gaining of Croatian independency until the SJCA became effective, as well as a comparative overview of the manner of appointment of presidents of courts in elected, related European legal systems. Moreover, the authors break down and analyse the procedures of the appointment of presidents of courts with a special reference to each phase. Here, special emphasis is given to the candidate valuation manner and criteria and the legal protection of candidates after the decision on appointment, both in the normative sense and in practice, all this accompanied by authors’ suggestions de lege ferenda.

  2. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  3. Hans Blix appointed Director General

    International Nuclear Information System (INIS)

    1981-01-01

    On 1 December 1981, Dr Hans Blix took office as Director General of the International Atomic Energy Agency in succession to Dr Sigvard Eklund who has headed the IAEA since 1961. The Agency's Board of Governors nominated Dr Blix by acclamation on 26 September. His appointment was unanimously approved by the final session of the 25th regular session of the General Conference of the IAEA the same day. The President of the Conference, Ambassador Manaspas Xuto, administered the oath of office to Dr Blix at the final plenary meeting that day. Hans Blix was born in 1928 in Uppsala He studied at the University of Uppsala, at Columbia University, where he was also a research graduate and at Cambridge, where he received his Ph D In 1959 he became Doctor of Laws at the Stockholm University and in 1960 was appointed associate professor in international law. From 1963 to 1976 Dr Blix was Head of Department at the Ministry for Foreign Affairs and served as Legal Adviser on International Law. In 1976 he became Undersecretary of State at the Ministry for Foreign Affairs in charge of international development co-operation He was appointed Minister for Foreign Affairs in October 1978 In September 1979 he was again appointed Undersecretary of State at the Ministry for Foreign Affairs in charge of international development co-operation. Since 1961 he has been a member of Sweden's delegation to the United Nations General Assembly, and from 1962 to 1978 a member of the Swedish delegation to the Conference on Disarmament in Geneva. He has written several books on subjects associated with international and constitutional law and was leader of the Liberal Campaign Committee in favour of retention of the Swedish nuclear energy program in the referendum in 1980

  4. Measuring Chemotherapy Appointment Duration and Variation Using Real-Time Location Systems.

    Science.gov (United States)

    Barysauskas, Constance M; Hudgins, Gina; Gill, Katie Kupferberg; Camuso, Kristen M; Bagley, Janet; Rozanski, Sheila; Kadish, Sarah

    Clinical schedules drive resource utilization, cost, and patient wait time. Accurate appointment duration allocation ensures appropriate staffing ratios to daily caseloads and maximizes scarce resources. Dana-Farber Cancer Institute (DFCI) infusion appointment duration is adjusted by regimen using a consensus method of experts including pharmacists, nurses, and administrators. Using real-time location system (RTLS), we examined the accuracy of observed appointment duration compared with the scheduled duration. Appointment duration was calculated using RTLS at DFCI between August 1, 2013, and September 30, 2013. Duration was defined as the total time a patient occupied an infusion chair. The top 10 administered infusion regimens were investigated (n = 805). Median observed appointment durations were statistically different than the scheduled durations. Appointment durations were shorter than scheduled 98% (C), 95% (I), and 75% (F) of the time and longer than scheduled 77% (A) and 76% (G) of the time. Fifty-six percent of the longer than scheduled (A) appointments were at least 30 minute longer. RTLS provides reliable and unbiased data to improve schedule accuracy. Replacing consensus with system-based data may improve clinic flow, relieve staff stress, and increase patient satisfaction. Further investigation is warranted to elucidate factors that impact variation in appointment duration.

  5. Shared and individual medical appointments for children and adolescents with type 1 diabetes: differences in topics discussed?

    NARCIS (Netherlands)

    Rijswijk, C.; Zantinge, E.; Seesing, F.; Raats, I.; Dulmen, S. van

    2010-01-01

    OBJECTIVE: The purpose of this study was to examine differences in the type of topics discussed during shared medical appointments (SMAs) and traditional individual outpatient visits for children and adolescents with type 1 diabetes. In addition, differences between the conversational contributions

  6. REGULATION OF NATIONAL QUALIFICATIONS SYSTEMS

    Directory of Open Access Journals (Sweden)

    Anna A. Muravyeva

    2014-01-01

    Full Text Available The paper looks into the diverse aspects of qualifications system regulation, designed for balancing the supply and demand in the labor and educational service markets. Both the objects and mechanisms of such regulation are described. Special attention is given to institutions, involved in regulation of qualifications, and their jurisdiction. Another emphasis is on the industry-related regulation of qualifications which proved to be effective both on the national and European level. Such structures were first established on the national levels to regulate the qualifications and ensure their comparability and compatibility, given the economic globalization and growing labor and academic mobility. The author points out the role of the ministries of education and labor in maintaining a steady qualifications system, and outlines the positive experience of Great Britain using the industry councils for continuing development of qualifications system.

  7. 38 CFR 17.100 - Refusal of treatment by unnecessarily breaking appointments.

    Science.gov (United States)

    2010-07-01

    ... and satisfactory reasons are advanced for breaking the appointment and circumstances were such that... unnecessarily breaking appointments. 17.100 Section 17.100 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Breaking Appointments § 17.100 Refusal of treatment by unnecessarily breaking...

  8. Scheduling rules to achieve lead-time targets in outpatient appointment systems

    OpenAIRE

    Sivakumar, Appa Iyer; Nguyen, Thu Ba Thi; Graves, Stephen C

    2015-01-01

    This paper considers how to schedule appointments for outpatients, for a clinic that is subject to appointment lead-time targets for both new and returning patients. We develop heuristic rules, which are the exact and relaxed appointment scheduling rules, to schedule each new patient appointment (only) in light of uncertainty about future arrivals. The scheduling rules entail two decisions. First, the rules need to determine whether or not a patient's request can be accepted; then, if the req...

  9. 25 CFR 140.1 - Sole power to appoint.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Sole power to appoint. 140.1 Section 140.1 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES LICENSED INDIAN TRADERS § 140.1 Sole power to appoint. The Commissioner of Indian Affairs shall have the sole power and authority to...

  10. Teacher qualification and teaching techniques in nursery schools in ...

    African Journals Online (AJOL)

    The scarcity of qualified teachers in Early Childhood Education in Rwanda in general, and in Kicukiro District in particular, raised interest and curiosity to conduct this study. Its main purpose was to examine the relationship between the qualification of teachers and their teaching techniques in preschools in Kicukiro District.

  11. Stock Market Reaction to CEO Appointment – Preliminary Results

    Directory of Open Access Journals (Sweden)

    Katarzyna Byrka-Kita

    2017-06-01

    Full Text Available Purpose: The aim of this paper is to examine shareholders’ reaction to the decision of the supervisory board to appoint a CEO in companies listed on the Warsaw Stock Exchange. Methodology: An event study and the mean-adjusted model were applied. The abnormal returns were measured as the CAAR in the entire (-60, + 60 window and selected sub-windows. Findings: The obtained values of abnormal returns indicate the shareholder’s negative reaction. Throughout the observation window, they oscillate slightly below zero, and in the window (0, +20 they are negative at -1.566%. Irrespective of the observation window, negative abnormal returns were obtained for over half of the observation (52–57%. Therefore, preliminary results indicate the predominance of the information effect over the real one. The decrease in market value as a result of the event may result from an increase in investors’ uncertainty as to the effects of changes in strategy and skills of the new CEO. Originality: The research is a unique one. To date, no one has carried out research into shareholders’ reaction to a CEO appointment in either the Polish or Central and Eastern European capital markets. They primarily bring the value of cognition of shareholders’ behaviour in the analysed event, which is reflected in share prices. They extend the literature on the signalization instruments, i.e. the activities that boards can undertake due to the new information transmitted to the capital market participants and stakeholders. The market reaction to a CEO appointment will without a doubt interest investors; the institutions responsible for supervision (which in the case of Poland is the Financial Oversight Commission and the legislator in charge of regulations that prevent insider trading while promoting corporate disclosure transparency.

  12. Methods Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Alessi, R. Sam; Grimmett, Tami; Vang, Leng; McGrath, Dave

    2010-01-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V and V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  13. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  14. Automated detection of follow-up appointments using text mining of discharge records.

    Science.gov (United States)

    Ruud, Kari L; Johnson, Matthew G; Liesinger, Juliette T; Grafft, Carrie A; Naessens, James M

    2010-06-01

    To determine whether text mining can accurately detect specific follow-up appointment criteria in free-text hospital discharge records. Cross-sectional study. Mayo Clinic Rochester hospitals. Inpatients discharged from general medicine services in 2006 (n = 6481). Textual hospital dismissal summaries were manually reviewed to determine whether the records contained specific follow-up appointment arrangement elements: date, time and either physician or location for an appointment. The data set was evaluated for the same criteria using SAS Text Miner software. The two assessments were compared to determine the accuracy of text mining for detecting records containing follow-up appointment arrangements. Agreement of text-mined appointment findings with gold standard (manual abstraction) including sensitivity, specificity, positive predictive and negative predictive values (PPV and NPV). About 55.2% (3576) of discharge records contained all criteria for follow-up appointment arrangements according to the manual review, 3.2% (113) of which were missed through text mining. Text mining incorrectly identified 3.7% (107) follow-up appointments that were not considered valid through manual review. Therefore, the text mining analysis concurred with the manual review in 96.6% of the appointment findings. Overall sensitivity and specificity were 96.8 and 96.3%, respectively; and PPV and NPV were 97.0 and 96.1%, respectively. of individual appointment criteria resulted in accuracy rates of 93.5% for date, 97.4% for time, 97.5% for physician and 82.9% for location. Text mining of unstructured hospital dismissal summaries can accurately detect documentation of follow-up appointment arrangement elements, thus saving considerable resources for performance assessment and quality-related research.

  15. Multi-agent Pareto appointment exchanging in hospital patient scheduling

    NARCIS (Netherlands)

    I.B. Vermeulen (Ivan); S.M. Bohte (Sander); D.J.A. Somefun (Koye); J.A. La Poutré (Han)

    2007-01-01

    htmlabstractWe present a dynamic and distributed approach to the hospital patient scheduling problem, in which patients can have multiple appointments that have to be scheduled to different resources. To efficiently solve this problem we develop a multi-agent Pareto-improvement appointment

  16. Multi-agent Pareto appointment exchanging in hospital patient scheduling

    NARCIS (Netherlands)

    Vermeulen, I.B.; Bohté, S.M.; Somefun, D.J.A.; Poutré, La J.A.

    2007-01-01

    We present a dynamic and distributed approach to the hospital patient scheduling problem, in which patients can have multiple appointments that have to be scheduled to different resources. To efficiently solve this problem we develop a multi-agent Pareto-improvement appointment exchanging algorithm:

  17. 25 CFR 11.704 - Appointment and duties of executor or administrator.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Appointment and duties of executor or administrator. 11... executor or administrator. (a) Upon ordering the estate to be probated, the court shall appoint an... be the executor of the estate shall be so appointed, provided such person is willing to serve in such...

  18. 45 CFR 211.5 - Action under State law; appointment of guardian.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false Action under State law; appointment of guardian... Action under State law; appointment of guardian. Whenever an eligible person is incapable of giving his... appointment of a legal guardian, to ensure the proper planning for and provision of such care and treatment. ...

  19. SRNL PHASE 1 Assessment Of The WTP Waste Qualification Program

    International Nuclear Information System (INIS)

    Peeler, D.; Hansen, E.; Herman, C.; Marra, S.; Wilmarth, B.

    2012-01-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project is currently transitioning its emphasis from an engineering design and construction phase toward facility completion, start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements that must be met during the actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program. In general, the waste qualification program involves testing and analysis to demonstrate compliance with waste acceptance criteria, determine waste processability, and demonstrate laboratory-scale unit operations to support WTP operations. The testing and analysis are driven by data quality objectives (DQO) requirements necessary for meeting waste acceptance criteria for transfer of high-level wastes from the tank farms to the WTP, and for ensuring waste processability including proper glass formulations during processing within the WTP complex. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS) which were based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested subject matter experts (SMEs) from SRNL to support a technology exchange with respect to waste qualification programs in which a critical review of the WTP program could be initiated and lessons learned could be shared. The technology exchange was held on July 18-20, 2011 in Richland, Washington, and was the initial step in a multi-phased approach to support development and implementation of a successful waste qualification program at the WTP. The 3-day workshop was hosted by WTP with representatives from the Tank Operations Contractor (TOC) and SRNL in attendance as well as representatives from the US DOE Office of River Protection (ORP) and the Defense Nuclear Facility Safety Board (DNFSB) Site Representative office. The purpose of the

  20. Chemotherapy appointment scheduling under uncertainty using mean-risk stochastic integer programming.

    Science.gov (United States)

    Alvarado, Michelle; Ntaimo, Lewis

    2018-03-01

    Oncology clinics are often burdened with scheduling large volumes of cancer patients for chemotherapy treatments under limited resources such as the number of nurses and chairs. These cancer patients require a series of appointments over several weeks or months and the timing of these appointments is critical to the treatment's effectiveness. Additionally, the appointment duration, the acuity levels of each appointment, and the availability of clinic nurses are uncertain. The timing constraints, stochastic parameters, rising treatment costs, and increased demand of outpatient oncology clinic services motivate the need for efficient appointment schedules and clinic operations. In this paper, we develop three mean-risk stochastic integer programming (SIP) models, referred to as SIP-CHEMO, for the problem of scheduling individual chemotherapy patient appointments and resources. These mean-risk models are presented and an algorithm is devised to improve computational speed. Computational results were conducted using a simulation model and results indicate that the risk-averse SIP-CHEMO model with the expected excess mean-risk measure can decrease patient waiting times and nurse overtime when compared to deterministic scheduling algorithms by 42 % and 27 %, respectively.

  1. Bilevel Fuzzy Chance Constrained Hospital Outpatient Appointment Scheduling Model

    Directory of Open Access Journals (Sweden)

    Xiaoyang Zhou

    2016-01-01

    Full Text Available Hospital outpatient departments operate by selling fixed period appointments for different treatments. The challenge being faced is to improve profit by determining the mix of full time and part time doctors and allocating appointments (which involves scheduling a combination of doctors, patients, and treatments to a time period in a department optimally. In this paper, a bilevel fuzzy chance constrained model is developed to solve the hospital outpatient appointment scheduling problem based on revenue management. In the model, the hospital, the leader in the hierarchy, decides the mix of the hired full time and part time doctors to maximize the total profit; each department, the follower in the hierarchy, makes the decision of the appointment scheduling to maximize its own profit while simultaneously minimizing surplus capacity. Doctor wage and demand are considered as fuzzy variables to better describe the real-life situation. Then we use chance operator to handle the model with fuzzy parameters and equivalently transform the appointment scheduling model into a crisp model. Moreover, interactive algorithm based on satisfaction is employed to convert the bilevel programming into a single level programming, in order to make it solvable. Finally, the numerical experiments were executed to demonstrate the efficiency and effectiveness of the proposed approaches.

  2. New appointment at the IAEA

    International Nuclear Information System (INIS)

    2000-01-01

    The document gives short information on the biography of Professor Dr. Werner Burkart from Germany who was appointed (as of July 2000) as Deputy Director General, Head of the Department of Nuclear Sciences and Applications, IAEA

  3. Use of environmental qualification data and techniques for life extension purposes

    International Nuclear Information System (INIS)

    Sinnappan, J.

    1991-01-01

    As several nuclear power plants in the United States now reach or exceed the midpoint of their original 40-year design life, efforts are underway to identify techniques and methods to demonstrate that the actual useful life of these plants exceeds the original design life. Some surveillance and monitoring programs for safety-related components are being developed to determine the actual consumed life and predict the remaining life. These data are useful for showing that plant components actually have a longer qualified life, which is the basis for the license renewal of nuclear power plants. This paper summarizes a proposed methodology using existing environmental qualification (EQ) data for safety-related Class 1E equipment and the results of surveillance and monitoring techniques to assess the actual consumed life and, consequently, predict the remaining life. It also discusses several techniques that can be used to address various aging degradation mechanisms to demonstrate longer qualified life of safety-related components. Examples of how these techniques can be used on components are shown

  4. Predictors of full-time faculty appointment among MD–PhD program graduates: a national cohort study

    Directory of Open Access Journals (Sweden)

    Dorothy A. Andriole

    2016-05-01

    Full Text Available Purpose: The authors sought to identify variables associated with MD–PhD program graduates’ academic medicine careers. Methods: We analyzed data for a national cohort of MD–PhD program graduates from 2000 to 2005, using multivariable logistic regression to identify independent predictors of full-time academic medicine faculty appointment through 2013. Results: Of 1,860 MD–PhD program graduates in 2000–2005, we included 1,846 (99.2% who had completed residency training before 2014. Of these 1,846 graduates, 968 (52.4% held full-time faculty appointments. Graduates who attended schools with Medical Scientist Training Program (MSTP funding (vs. no MSTP funding; adjusted odds ratio [aOR], 1.41; 95% confidence interval [CI], 1.14–1.74 and participated in ≥1 year of research during residency (vs. no documented research year; aOR, 1.85; 95% CI, 1.50–2.28 were more likely to have held full-time faculty appointments. Asian/Pacific Islander (aOR, 0.74; 95% CI, 0.60–0.93 and under-represented minority (URM; aOR, 0.68; 95% CI, 0.48–0.98 graduates (each vs. white graduates, graduates who reported total debt of ≥$100,000 (vs. no debt at graduation (aOR, 0.58; 95% CI, 0.39–0.88, and graduates in surgical practice (aOR, 0.64; 95% CI, 0.48–0.84 and other practice (aOR, 0.66, 95% CI, 0.54–0.81 specialties (each vs. ‘medicine, pediatrics, pathology, or neurology’ were less likely to have held full-time faculty appointments. Gender was not independently associated with likelihood of full-time faculty appointment. Conclusions: Over half of all MD–PhD program graduates in our study had full-time faculty appointments. Our findings regarding variables independently associated with full-time faculty appointments can inform the design of strategies to promote academic medicine career choice among MD–PhD program graduates. Further research is warranted to identify other factors amenable to intervention, in addition to those included in

  5. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  6. Design and qualification testing of a strontium-90 fluoride heat source

    International Nuclear Information System (INIS)

    Fullam, H.T.

    1981-12-01

    The Strontium Heat Source Development Program began at the Pacific Northwest Laboratory (PNL) in 1972 and is scheduled to be completed by the end of FY-1981. The program is currently funded by the US Department of Energy (DOE) By-Product Utilization Program. The primary objective of the program has been to develop the data and technology required to permit the licensing of power systems for terrestrial applications that utilize 90 SrF 2 -fueled radioisotope heat sources. A secondary objective of the program has been to design and qualification-test a general purpose 90 SrF 2 -fueled heat source. The effort expended in the design and testing of the heat source is described. Detailed information is included on: heat source design, licensing requirements, and qualification test requirements; the qualification test procedures; and the fabrication and testing of capsules of various materials. The results obtained in the qualification tests show that the outer capsule design proposed for the 90 SrF 2 heat source is capable of meeting current licensing requirements when Hastelloy S is used as the outer capsule material. The data also indicate that an outer capsule of Hastelloy C-4 would probably also meet licensing requirements, although Hastelloy S is the preferred material. Therefore, based on the results of this study, the general purpose 90 SrF 2 heat source will consist of a standard WESF Hastelloy C-276 inner capsule filled with 90 SrF 2 and a Hastelloy S outer capsule having a 2.375-in. inner diameter and 0.500-in. wall thickness. The end closures for this study, the general purpose 90 SrF 2 heat a Hastelloy S outer capsule having a 2.375-in. inner diameter and 0.500-in. wall thickness. The end closures for the outer capsule will utilize an interlocking joint design requiring a 0.1-in. penetration closure weld

  7. 7 CFR 1260.145 - Appointment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE BEEF PROMOTION AND RESEARCH Beef Promotion and Research Order Cattlemen's Beef Promotion and Research Board § 1260.145 Appointment. (a) From...

  8. 7 CFR 1221.103 - Appointment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... INFORMATION ORDER Sorghum Promotion, Research, and Information Order Sorghum Promotion, Research, and Information Board § 1221.103 Appointment. From the nominations made pursuant to § 1221.101, the Secretary...

  9. 5 CFR 330.1106 - Appointment.

    Science.gov (United States)

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS RECRUITMENT, SELECTION, AND PLACEMENT (GENERAL) Federal Employment Priority Consideration Program for Displaced Employees of the... under Public Law 105-274. For employees appointed before October 21, 1998, the conversion will be...

  10. Environmental qualification program for new designs

    International Nuclear Information System (INIS)

    Doerffer, K.

    2007-01-01

    Qualification of nuclear power plant equipment and components important to safety (ITS) is an integral part of the design process. The qualification methodology differs based on the severity of service conditions (operational and ambient), to which the ITS equipment is exposed. In Canada, the licensing requirements for environmental qualification for new designs are governed by the Canadian Standard Association (CSA) standard, N290.13-2005 titled 'Environmental Qualification of Equipment for CANDU Nuclear Power Plants' and the pre-consultation draft, 'Requirements for Design of Nuclear Power Plants'(DRD), issued for trial use by the Canadian Nuclear Safety Commission (CNSC) in March 2005. This paper will describe AECL's current Environmental Qualification program developed to comply with the above licensing requirements as applied to new designs. The focus will be given to qualification of ITS systems structures and components (SSC) to harsh conditions occurring due to the Design Basis Accidents (DBA). (author)

  11. MTR fuel plate qualification in OSIRIS reactor

    International Nuclear Information System (INIS)

    Sacristan, P.; Boulcourt, P.; Naury, S.; Marchard, L.; Carcreff, H.; Noirot, J.

    2005-01-01

    Qualification of new MTR fuel needs the irradiation in research reactors under representative neutronic, heat flux and thermohydraulic conditions. The experiments are performed in France in the OSIRIS reactor by irradiating MTR full size fuel plates in the IRIS device located in the reactor core. The fuel plates are easily removed from the device during the shutdown of the reactor for performing thickness measurements along the plates by means of a swelling measurement device. Beside the calculation capabilities, the experimental platform includes: the ISIS neutron mock-up for the measurement of neutron flux distribution along the plates; the γ spectrometry for the purpose of measuring the activities of the radionuclides representative of the power and the burnup and to compare with the neutronic calculation. Owing to the experience feedback, a good agreement is observed between calculation and measurement; destructive post irradiation examinations in the LECA facility (Cadarache). New irradiations with the IRIS device and at higher heat flux are under preparation for qualification of MTR fuels. (author)

  12. VHDL basics applied design by SIPAC qualification system

    International Nuclear Information System (INIS)

    Park, In Ha; Mun, Da Cheol; Lee, Gwang Yeob

    2005-12-01

    This book has six chapters, which are about Flowrian of SIPAC qualification system including internet CAD system and remote server service, logic circuit on design and qualification of device such as gate circuit, multiplex and decoder, order logic circuit with D type flip-flop design and qualification and Rom and RAM's design and qualification, finite state machine such as odd checker, sequence detector, test clock generator and traffic light controller, design and qualification about data path, design of application circuit. It has two appendixes on install and the way to use SIPAC qualification system and remote service for SIPAC qualification system.

  13. 7 CFR 1280.204 - Appointment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Appointment. 1280.204 Section 1280.204 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... INFORMATION ORDER Lamb Promotion, Research, and Information Order Lamb Promotion, Research, and Information...

  14. Manual on training, qualification and certification of quality assurance personnel

    International Nuclear Information System (INIS)

    1986-01-01

    The Manual is applicable to those participants in a nuclear power project who are associated with establishment and implementation of the various quality assurance (QA) programmes during the life cycle of the project. It provides examples of typical QA functions to be undertaken and the associated qualification requirements, training programmes, training techniques and methods of certification of personnel implementing these functions. The necessary qualification and training requirements and practices for QA personnel are dependent primarily on the functions or activities to be performed. The two main functions of the QA unit noted previously as (a) ensuring QA programme establishment and execution and (b) verifying that activities have been correctly performed have been found in practice to require different qualifications and training of personnel. Therefore, for the purpose of this Manual the QA personnel may be classified in two groups who perform: QA programmatic and evaluation functions; Inspection and test functions. These titles do not necessarily represent separate or individual organizational groups or units and may be composed of one or of several different organizations

  15. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  16. Scheduling patient appointments via multilevel template: a case study in chemotherapy

    OpenAIRE

    Condotta, A; Shakhlevich, NV

    2014-01-01

    This paper studies a multi-criteria optimization problem which appears in the context of booking chemotherapy appointments. The main feature of the model under study is the requirement to book for each patient multiple appointments which should follow a pre-specified multi-day pattern. Each appointment involves several nurse activities which should also follow a pre-specified intra-day pattern. The main objectives are to minimize patients’ waiting times and peaks of nurses’ workload for an ou...

  17. International Harmonization of Training and Qualification in the Manufacturing Industry

    Science.gov (United States)

    Quintino, L.; Fernandes, I.; Miranda, R. M.

    2011-01-01

    Purpose: The aim of this paper is to propose a model for international harmonization of the training and qualification of human resources for industrial professions. The outcome is a system based on training guidelines and a quality assurance methodology that is now in use in 42 countries around the world. Design/methodology/approach: The paper…

  18. DOE handbook: Guide to good practices for training and qualification of chemical operators

    International Nuclear Information System (INIS)

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used as a reference to refine existing chemical operator training programs, or develop new training programs where no program exists. This guide, used in conjunction with facility-specific job analyses, will provide a framework for training and qualification programs for chemical operators at DOE reactor and nonreactor facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. Contents include: initial qualification; administrative training; industrial safety training; specialized skills training; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Two appendices describe Fundamentals training and Process operations. This handbook covers chemical operators in transportation of fuels and wastes, spent fuel receiving and storage, fuel disassembly, fuel reprocessing, and both liquid and solid low-level waste processing

  19. Predictors of missed appointments in patients referred for congenital or pediatric cardiac magnetic resonance

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Jimmy C.; Dorfman, Adam L. [C.S. Mott Children' s Hospital, Department of Pediatrics and Communicable Diseases, Division of Pediatric Cardiology, University of Michigan Health System, University of Michigan Congenital Heart Center, Ann Arbor, MI (United States); C.S. Mott Children' s Hospital, Department of Radiology, University of Michigan Health System, Section of Pediatric Radiology, Ann Arbor, MI (United States); Lowery, Ray; Yu, Sunkyung [C.S. Mott Children' s Hospital, Department of Pediatrics and Communicable Diseases, Division of Pediatric Cardiology, University of Michigan Health System, University of Michigan Congenital Heart Center, Ann Arbor, MI (United States); Ghadimi Mahani, Maryam [C.S. Mott Children' s Hospital, Department of Radiology, University of Michigan Health System, Section of Pediatric Radiology, Ann Arbor, MI (United States); Agarwal, Prachi P. [University of Michigan Health System, Department of Radiology, Division of Cardiothoracic Radiology, Ann Arbor, MI (United States)

    2017-07-15

    Congenital cardiac magnetic resonance is a limited resource because of scanner and physician availability. Missed appointments decrease scheduling efficiency, have financial implications and represent missed care opportunities. To characterize the rate of missed appointments and identify modifiable predictors. This single-center retrospective study included all patients with outpatient congenital or pediatric cardiac MR appointments from Jan. 1, 2014, through Dec. 31, 2015. We identified missed appointments (no-shows or same-day cancellations) from the electronic medical record. We obtained demographic and clinical factors from the medical record and assessed socioeconomic factors by U.S. Census block data by patient ZIP code. Statistically significant variables (P<0.05) were included into a multivariable analysis. Of 795 outpatients (median age 18.5 years, interquartile range 13.4-27.1 years) referred for congenital cardiac MR, a total of 91 patients (11.4%) missed appointments; 28 (3.5%) missed multiple appointments. Reason for missed appointment could be identified in only 38 patients (42%), but of these, 28 (74%) were preventable or could have been identified prior to the appointment. In multivariable analysis, independent predictors of missed appointments were referral by a non-cardiologist (adjusted odds ratio [AOR] 5.8, P=0.0002), referral for research (AOR 3.6, P=0.01), having public insurance (AOR 2.1, P=0.004), and having scheduled cardiac MR from November to April (AOR 1.8, P=0.01). Demographic factors can identify patients at higher risk for missing appointments. These data may inform initiatives to limit missed appointments, such as targeted education of referring providers and patients. Further data are needed to evaluate the efficacy of potential interventions. (orig.)

  20. Approximate dynamic programming approaches for appointment scheduling with patient preferences.

    Science.gov (United States)

    Li, Xin; Wang, Jin; Fung, Richard Y K

    2018-04-01

    During the appointment booking process in out-patient departments, the level of patient satisfaction can be affected by whether or not their preferences can be met, including the choice of physicians and preferred time slot. In addition, because the appointments are sequential, considering future possible requests is also necessary for a successful appointment system. This paper proposes a Markov decision process model for optimizing the scheduling of sequential appointments with patient preferences. In contrast to existing models, the evaluation of a booking decision in this model focuses on the extent to which preferences are satisfied. Characteristics of the model are analysed to develop a system for formulating booking policies. Based on these characteristics, two types of approximate dynamic programming algorithms are developed to avoid the curse of dimensionality. Experimental results suggest directions for further fine-tuning of the model, as well as improving the efficiency of the two proposed algorithms. Copyright © 2018 Elsevier B.V. All rights reserved.

  1. Directors General appointed

    CERN Multimedia

    1975-01-01

    At a special session on 21 March, presided over by P. Levaux, the Council of the European Organization for Nuclear Research appointed J . B. Adams and L . Van Hove as Directors General of the Organization for a period of five years beginning 1 January 1976. Dr. Adams will be responsible for the administration of CERN, for the operation of the equipment and services and for the construction of buildings and major equipment. Professor Van Hove will be responsible for the research activities of the Organization.

  2. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  3. Qualification of ISI for Bulgarian NPP: UK support

    International Nuclear Information System (INIS)

    Booler, R.

    2000-01-01

    UK Regulator (NII) Phare project provides an assistance to the Bulgarian Regulator in setting up the technical infrastructure for inspection qualification consistent with IAEA Guidelines and western European practice. The Strategy Document defines the methodology for inspection qualification and general roles and responsibilities of the involved organizations. The Qualification Inputs Document describes the information required for the Technical Specifications (component details, inspection aims and limitations). It applies the idea of qualification level - level 1(lowest) to level 3 (highest). The Qualification Procedure Document provides a guidance to the utility ('Kozloduy' NPP) on the preparation of Qualification Procedures (QP). The appendix provides a specific guidance on the performance of the all aspects of qualification at different levels and recommendations for technical justification. QB Method Working Document provides guidance for the Qualification Body. Facilities and Resources Document defines the facilities and resources required for the Qualification Body to perform the tasks described in the Method Working Document. High level QA Document defines the principles of quality control. Other issues and progress report are also presented

  4. 26 CFR 20.2041-1 - Powers of appointment; in general.

    Science.gov (United States)

    2010-04-01

    ... Powers of appointment; in general. (a) Introduction. A decedent's gross estate includes under section... beneficiary of a trust to assent to a periodic accounting, thereby relieving the trustee from further... 26 Internal Revenue 14 2010-04-01 2010-04-01 false Powers of appointment; in general. 20.2041-1...

  5. 10 CFR 1045.33 - Appointment of restricted data management official.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Appointment of restricted data management official. 1045... DECLASSIFICATION Generation and Review of Documents Containing Restricted Data and Formerly Restricted Data § 1045.33 Appointment of restricted data management official. (a) Each agency with access to RD or FRD shall...

  6. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  7. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  8. Health Beliefs and Co-morbidities Associated with Appointment-Keeping Behavior Among HCV and HIV/HCV Patients.

    Science.gov (United States)

    Pundhir, Pooja; North, Carol S; Fatunde, Oluwatomilade; Jain, Mamta K

    2016-02-01

    Appointment-keeping behavior is an important requisite for HCV linkage and treatment initiation. In this study we examine what impact hepatitis C (HCV) knowledge and attitudes has on appointment-keeping behavior among a cohort of HCV and HCV/HIV patients. Knowledge scores and attitude scales, obtained from a cross-sectional survey, were correlated with proportion of appointments kept 1 year prior to taking the survey. Independent risk factors for missing appointments were examined by multiple regression analysis. 292 HCV patients completed the survey, and 149 (51%) were co-infected with HIV. HCV patients kept 67.5 ± 17.4% of their total appointments and a similar proportion (67 ± 38.2) of Liver Clinic appointments, but they attended a higher proportion (73 ± 24.4) of Primary Care Clinic appointments. However, certain health beliefs, psychiatric illness, and HIV co-infection were independently associated with lower levels of appointment-keeping behavior. HCV knowledge was not associated with appointment-keeping behavior. Health beliefs, psychiatric illness, and HIV co-infection are associated with missing appointments, but no link between knowledge and appointment keeping behavior is apparent. In order to increase engagement into HCV care, HCV care coordination programs need to focus on addressing health beliefs and providing resources to those at highest risk for missing appointments.

  9. An Effective Outpatient Appointment System for General Leonard Wood Army Community Hospital

    Science.gov (United States)

    1990-07-13

    collection, donated many hours. She asked patients about the appointment system and personally observed clinic personnel. Additionally, as a consumer ...appointment system which must satisfy both the demands 0of external ( patients ) and internal (physicians) customers . At the o0 C 0 same time, the...its health care environment. A variable that can effect patient flow is centralization or decentralization of the registration and appointment system

  10. Pengaruh Appointment Registration System terhadap Waktu Tunggu dan Kepuasan Pasien

    Directory of Open Access Journals (Sweden)

    Yuli Susanti

    2015-02-01

    Full Text Available Abstrak Peningkatan derajat kesehatan dapat dicapai melalui kemudahan akses terhadap fasilitas kesehatan. Peningkatan peserta pada program Jaminan Kesehatan Nasional (JKN mengakibatkan antrian panjang di sarana pelayanan kesehatan. Penelitian ini bertujuan untuk menganalisis pengaruh metode appointment registration system (ARS terhadap waktu tunggu dan kepuasan pasien. Metode penelitian yang digunakan adalah survei dengan sampel 380 orang dan observasi pada bulan Desember 2014 di RS Al-Islam Bandung. Analisis menggunakan structural equation modeling (SEM dan production operation management-quantitative methods (POMQM. Hasil penelitian diperoleh kondisi pelaksanaan ARS (60,7%, waktu tunggu (59,1%, dan kepuasan pasien (67,3% termasuk dalam kategori cukup. Terdapat pengaruh positif dan signifikan ARS terhadap waktu tunggu (51,84%, pengaruh positif dan signifikan waktu tunggu terhadap kepuasan pasien (25%, dan total pengaruh ARS terhadap kepuasan pasien (16,79%. ARS dapat menurunkan waktu tunggu secara efektif tetapi tidak semua metode ARS dapat menurunkan waktu tunggu. Simpulan, pasien RS Al-Islam Bandung merasa cukup puas terhadap pendaftaran appointment dan waktu tunggu. Kata kunci: Appointment registration system, kepuasan pasien, waktu tunggu   The Influence of Outpatient Appointment Registration System to Waiting Time and Patient Satisfications Abstract Health improvement can be achieved through accessibility to health services. An increased participants in the Health Insurance Program (HIP resulted in a long queue in the hospital. This research aim was to analize influence of appointment registration system (ARS to waiting time and patient satisfaction. Research method using patient satisfaction survey in 380 subjects and observation on December 2014 at Al-Islam Bandung Hospital. The result was analyzed using structural equation modeling (SEM and production operation management-quantitative methods (POMQM. The results showed that the

  11. Qualification testing and electrical measurement experience: A manufacturer's view

    Science.gov (United States)

    Arnett, J. C.; Cooley, J. E.; Wingert, T. L.

    1983-11-01

    ARCO Solar's experiences as a participant in an industry-utility-government environmental qualification team examining photovoltaic devices are discussed. Included is an assessment of the applicability, completeness and appropriateness of the testing procedures and of the acceptance criteria for megawatt-sized procurements for utilities. Like the stand-alone users, the utility industry is interested in obtaining low costs, but additional concerns exist related to reliability and durability, safety, grounding and overall system criteria including performance prediction (related to output power acceptance testing), power quality and dispatchability. For purposes of this first major purchase of photovoltaic modules and panels by the utility industry, there was a carry-over of the JPL specifications. The need exists for futher development, assessement, and selection of qualification and testing standards and evaluation criteria specifically addressing these additional concerns for utility-connected PV power-plant applications.

  12. CLASSIFICATION OF SPECIALTIES AND QUALIFICATIONS IN REPUBLIC OF BELARUS: TENDENCIES AND PROSPECTS

    Directory of Open Access Journals (Sweden)

    O. A. Oleks

    2016-01-01

    Full Text Available In the present publication short data on the system of specialties and qualifications functioning in Republic of Belarus, her features, scope of application are given. The purpose and problems of the revision of the National classifier of the Republic of Belarus «Specialties and qualifications», its orientation to reduce the gap between the content of education and content of activity of graduates of establishments of education are described. The main tendencies of change of the operating classification – on the basis of types of economic activity and international standard classification of education taking into account requirements of employers, minimization of economic expenses for education, including due to minimization of classification units, rapprochement of positions with educational systems of other states are revealed. Prospects of development of national system of specialties and qualifications are disclosed. Tendencies and prospects of the expected changes are shown on the examples of the certain specialties offered by BNTU (Belarusian National Technical University.

  13. Pilot study approach and qualification dossier components

    International Nuclear Information System (INIS)

    Ammirato, F.; Ashwin, P.

    2000-01-01

    The aim of the Pilot Project is to evaluate the IAEA Guidelines and methodology for the benefit of IAEA Member States trough a simulation of qualification activities. The Project is based on a real component and available data - NPP Kozloduy unit 5, weld 3. The initial phase is limited to the Qualification dossier. The Project relies on the input from the team members and Member States. Team organization and responsibilities are presented. The components of the Qualification Dossier (technical specification, inspection procedure and preliminary review, qualification procedure) and their current status are also presented. A comparison is done with their qualification programs. The characteristics of performance demonstrations are discussed. The results show that the teamwork has been successful and the IAEA methodology covers all situations. It is expected that the End Project will become 'Benchmark's' for future qualification activities

  14. The Interaction of Publications and Appointments: New Evidence on Academic Economists in Germany

    Science.gov (United States)

    Beckmann, Klaus; Schneider, Andrea

    2013-01-01

    Using a new panel data set comprising publication and appointment data for 889 German academic economists over a quarter of a century, we confirm the familiar hypothesis that publications are important for professorial appointments, but find only a small negative effect of appointments on subsequent research productivity, in particular if one…

  15. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  16. 14 CFR 121.412 - Qualifications: Flight instructors (airplane) and flight instructors (simulator).

    Science.gov (United States)

    2010-01-01

    ... (airplane) and flight instructors (simulator). 121.412 Section 121.412 Aeronautics and Space FEDERAL... OPERATIONS Training Program § 121.412 Qualifications: Flight instructors (airplane) and flight instructors (simulator). (a) For the purposes of this section and § 121.414: (1) A flight instructor (airplane) is a...

  17. Qualifications of an Ideal Teacher According to Social Studies Preservice Teachers

    Science.gov (United States)

    Gencturk, Ebru; Akbas, Yavuz; Kaymakci, Selahattin

    2012-01-01

    In this study, the question of what kind of qualifications an ideal social studies teacher has tried to be investigated. For this purpose, freshman social studies preservice teachers' perceptions about the concept of "ideal teacher" were explored. This study was designed with document analysis, one of the methods of qualitative approach.…

  18. 49 CFR 180.507 - Qualification of tank cars.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Qualification of tank cars. 180.507 Section 180... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used...

  19. Data qualification summary for 1985 L-Area AC Flow Tests

    International Nuclear Information System (INIS)

    Edwards, T.B.; Eghbali, D.A.; Liebmann, M.L.; Shine, E.P.

    1992-03-01

    The 1985 L-Area AC Flow Tests were conducted to provide an extended data base for upgrading the reactor system models employed in predicting normal process water flows. This report summarizes the results of the recently completed, formal, technical review of the data from the 1985 L-Area AC Flow Tests as detailed in document SCS-CMAS-910045. The purpose of that review was to provide corroborating technical information as to the quality (fitness for use) of these experimental data. Reference [1] required three volumes to fully document the results of that Data Qualification process. This report has been prepared to provide the important conclusions from that process in a manageable and understandable format. Consult reference [1] if any additional information or detail is needed. This report provides highlights from that study: an overview of the tests and data, a description of the instrumentation used, an explanation of the data qualification methods employed to review the data, and the important conclusions reached from the study. Reference 1: Edwards, T.B., D.A. Eghbali, M.L. Liebmann, and E.P. Shine, open-quotes Data Qualification for 1985 L-Area AC Flow Tests,close quotes SCS-CMAS-910045, December 31, 1991

  20. On ISI effectiveness through inspection qualification

    International Nuclear Information System (INIS)

    Harutyunov, R.

    2000-01-01

    There are two units of WWER type in the ANPP. The results of the implementation of the IAEA qualification guidelines for the ANPP Primary Circuit for WWER are presented. The control methods according to the ISI Program are foreseen in the design and implemented during the preparation for the unit 2 restart. The result of control is plugging of more tubes than during the last operation period. During the next years in the presence of the blowdown water activity, the search on defective tubes was performed by Lumhydraulic methods and the tubes were plugged by welding plugs. In 1999 was performed the visual control on the Steam Generator 6 by WNIAES experts and by the ANPP experts from the Metal Laboratory. The result is confirmation of the irreversible process on erosive-corrosion destruction of feed waters distribution header; definition of the defects coordinates defined; detection of sediments within the SG vessel surfaces and in the head exchanged surface tubes. The purpose of the ISI effectiveness improvement is to discover the defects in the base metal and in the welds before developing into a problem at operating level or a safety problem. For the solution on the specific problems at the ANPP the project for technological co-operation with IAEA has been developed. It is necessary to organize training, certification, assessment methodology. The expected results after the project implementation are to establish the base for the equipment qualification body and staff certification; to upgrade the ANPP staff qualification; to prepare a group of experts, supported by ANRA, which to be also involved in the development of NDM national regulators

  1. Mobile phone messaging reminders for attendance at healthcare appointments.

    Science.gov (United States)

    Gurol-Urganci, Ipek; de Jongh, Thyra; Vodopivec-Jamsek, Vlasta; Atun, Rifat; Car, Josip

    2013-12-05

    This review is an update of the original Cochrane review published in July 2012. Missed appointments are a major cause of inefficiency in healthcare delivery with substantial monetary costs for the health system, leading to delays in diagnosis and appropriate treatment. Patients' forgetfulness is one of the main reasons for missed appointments. Patient reminders may help reduce missed appointments. Modes of communicating reminders for appointments to patients include face-to-face communication, postal messages, calls to landlines or mobile phones, and mobile phone messaging. Mobile phone messaging applications, such as Short Message Service (SMS) and Multimedia Message Service (MMS), could provide an important, inexpensive delivery medium for reminders for healthcare appointments. To update our review assessing the effects of mobile phone messaging reminders for attendance at healthcare appointments. Secondary objectives include assessment of costs; health outcomes; patients' and healthcare providers' evaluation of the intervention and perceptions of safety; and possible harms and adverse effects associated with the intervention. Original searches were run in June 2009. For this update, we searched the Cochrane Central Register of Controlled Trials (CENTRAL,The Cochrane Library 2012, Issue 8), MEDLINE (OvidSP) (January 1993 to August 2012), EMBASE (OvidSP) (January 1993 to August 2012), PsycINFO (OvidSP) (January 1993 to August 2012) and CINAHL (EbscoHOST) (January 1993 to August 2012). We also reviewed grey literature (including trial registers) and reference lists of articles. Randomised controlled trials (RCTs) assessing mobile phone messaging as reminders for healthcare appointments. We only included studies in which it was possible to assess effects of mobile phone messaging independent of other technologies or interventions.   Two review authors independently assessed all studies against the inclusion criteria, with any disagreements resolved by a third

  2. Mobile phone messaging reminders for attendance at healthcare appointments.

    Science.gov (United States)

    Car, Josip; Gurol-Urganci, Ipek; de Jongh, Thyra; Vodopivec-Jamsek, Vlasta; Atun, Rifat

    2012-07-11

    Missed appointments are a major cause of inefficiency in healthcare delivery, with substantial monetary costs for the health system, leading to delays in diagnosis and appropriate treatment. Patients' forgetfulness is one of the main reasons for missed appointments, and reminders may help alleviate this problem. Modes of communicating reminders for appointments to patients include face-to-face communication, postal messages, calls to landlines or mobile phones, and mobile phone messaging. Mobile phone messaging applications such as Short Message Service (SMS) and Multimedia Message Service (MMS) could provide an important, inexpensive delivery medium for reminders for healthcare appointments. To assess the effects of mobile phone messaging reminders for attendance at healthcare appointments. Secondary objectives include assessment of patients' and healthcare providers' evaluation of the intervention; costs; and possible risks and harms associated with the intervention. We searched the Cochrane Central Register of Controlled Trials (CENTRAL,The Cochrane Library 2009, Issue 2), MEDLINE (OvidSP) (January 1993 to June 2009), EMBASE (OvidSP) (January 1993 to June 2009), PsycINFO (OvidSP) (January 1993 to June 2009), CINAHL (EbscoHOST) (January 1993 to June 2009), LILACS (January 1993 to June 2009) and African Health Anthology (January 1993 to June 2009). We also reviewed grey literature (including trial registers) and reference lists of articles. We included randomised controlled trials (RCTs), quasi-randomised controlled trials (QRCTs), controlled before-after (CBA) studies, or interrupted time series (ITS) studies with at least three time points before and after the intervention. We included studies assessing mobile phone messaging as reminders for healthcare appointments. We only included studies in which it was possible to assess effects of mobile phone messaging independent of other technologies or interventions.   Two review authors independently assessed all

  3. Qualification of γ-heating calculation in nuclear reactors

    International Nuclear Information System (INIS)

    Ravaux, Simon

    2013-01-01

    During the last few years, the γ-heating issue has gained in stature, mainly for the safety of the 3. generation reactors in which a stainless steel reflector is inserted. The purpose of this work is the qualification of the needed tools for calculation of the γ-heating in the nuclear reactors. In a nuclear reactor, all the photons are directly or indirectly produced by the neutron-matter interactions. Thus, the first phase of this work is a critical analysis of the photon production data in the standard nuclear data library. New evaluations have been proposed to the next version of the JEFF library after that some omissions have been found. They have partly been accepted for JEFF-3.2. Two particle-transport codes are currently developed in the CEA: the deterministic code APOLLO2 and the Monte Carlo code TRIPOLI4. The second part of this work is the qualification of both these codes by interpreting an integral experiment called PERLE. The experimental set-up is made by a LWR pin assembly surrounded by a stainless steel reflector in which the γ-heating is measured by Thermo-luminescent Detector (TLD). A calculation scheme has been proposed for both APOLLO2 and TRIPOLI4 in order to calculate the TLD's responses. Comparisons between calculations and measurements have shown that TRIPOLI4 gives a satisfactory estimation of the γ-heating in the reflector. These discrepancies are within the experimental 1 σ uncertainty. Before the qualification, APOLLO2 has been previously validated against TRIPOLI4 reference calculation. This validation gives an estimation of the bias due to the deterministic approximations of the transport equation resolution. The qualification has shown that the discrepancies between APOLLO2 predictions and TLD's measurements are in the same range as experimental uncertainties. (author) [fr

  4. ENIQ: European Network for Inspection Qualification

    International Nuclear Information System (INIS)

    Champigny, F.; Crutzen, S.; Lemaitre, P.

    1995-01-01

    Many countries are currently considering their own approach to inspection qualification and are carefully assessing experience to date. ENIQ, which stands for European Network for Inspection Qualification, groups the major part of the utilities in Western Europe. The general objective of ENIQ is to coordinate and manage at European level expertise and resources for the assessment and qualification of NDE inspection techniques and procedures, primarily for nuclear components. Also non-nuclear heavy duty components will be considered. Within ENIQ there is a growing consensus of opinion on the general principles of a European approach towards inspection qualification. In this paper the main activities, organization and actual status of ENIQ will be discussed

  5. 5 CFR 9901.511 - Appointing authorities.

    Science.gov (United States)

    2010-01-01

    ... 9901.511 Administrative Personnel DEPARTMENT OF DEFENSE HUMAN RESOURCES MANAGEMENT AND LABOR RELATIONS SYSTEMS (DEPARTMENT OF DEFENSE-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF DEFENSE NATIONAL SECURITY... these authorities will be given career, career conditional, term or temporary appointments in the...

  6. Developments in mechanical ultrasonic inspection and qualification of NDE

    International Nuclear Information System (INIS)

    Kauppinen, P.; Pitkaenen, J.; Kuusinen, P.

    2001-01-01

    Reliability of non-destructive testing results has a direct influence on structural integrity assessment and safety of the inspected structures e.g. NPP primary circuit pressure boundaries. Advanced technology together with highly skilled and experienced personnel is required. One of the current trends is automation. Mechanised equipment can replace tedious manual work in positioning and moving of the transducers. Large areas can be scanned, analysed and numerically documented for direct comparison of eventual later repeated inspections. Another major trend is qualification, which aims to ensure that the inspection results are correct and fit the purpose. The suitability and proper operation of equipment, methods and personnel i.e. the whole chain shall be proven. This presentation summarises the advances in automation and qualification of non-destructive inspection during the second project year, Monitoring of material degradation was included in the studied topics and will also be shortly described. (author)

  7. Impact of the draft DOE Training and Qualification Standard on an established training and qualification program

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1999-01-01

    One of the provisions of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 97-2 was that the US Department of Energy (DOE) hor e llipsis Develop and institute ahor e llipsiscourse in criticality and criticality safety hor e llipsis to serve as the foundation for a program of formal qualification of criticality engineers. In response, a draft DOE standard establishing requirements for a formal qualification program for nuclear criticality safety (NCS) engineers has been prepared and is currently in review. The Oak Ridge Y-12 plant implemented a formal training and qualification program for NCS engineers in 1995. The program complies with existing DOE requirements. The program was developed using a performance-based systematic approach to training and is accomplished through structured mentoring where experienced personnel interact with candidates through various learning exercises. Self-study, exercises, and work under instruction are all utilized. The candidate's performance is evaluated by mentors and oral boards. Competency gained through experience at other sites can also be credited. Technical portions of the program are primarily contained in an initial Engineer-in-Training segment and in subsequent task-specific qualifications. The Engineer-in-Training segment exposes the candidate to fundamental NCS concepts through example problems; ensures the initial compliance training requirements are met; and includes readings from applicable procedures, technical documents, and standards. Upon completion of this initial training, candidates proceed to task qualifications. Tasks are defined NCS activities such as operational reviews, criticality safety evaluations, criticality safety computations, criticality accident alarm system (CAAS) evaluations, support for emergency management, etc. Qualification on a task basis serves to break up training into manageable pieces and expedites qualification of candidates to perform specific production activities. The

  8. Equipment qualification testing methodology research at Sandia Laboratories

    International Nuclear Information System (INIS)

    Jeppesen, D.

    1983-01-01

    The Equipment Qualification Research Testing (EQRT) program is an evolutionary outgrowth of the Qualification Testing Evaluation (QTE) program at Sandia. The primary emphasis of the program has been qualification methodology research. The EQRT program offers to the industry a research-oriented perspective on qualification-related component performance, as well as refinements to component testing standards which are based upon actual component testing research

  9. 14 CFR 121.453 - Flight engineer qualifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  10. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    International Nuclear Information System (INIS)

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training

  11. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training.

  12. Effectiveness of mobile-phone short message service (SMS reminders for ophthalmology outpatient appointments: Observational study

    Directory of Open Access Journals (Sweden)

    Car Josip

    2008-05-01

    Full Text Available Abstract Background Non-attendance for hospital outpatient appointments is a significant problem in many countries. It causes suboptimal use of clinical and administrative staff and financial losses, as well as longer waiting times. The use of Short Message Service (SMS appointment reminders potentially offers a cost-effective and time-efficient strategy to decrease non-attendance and so improve the efficiency of outpatient healthcare delivery. Methods An SMS text message was sent to patients with scheduled appointments between April and September 2006 in a hospital ophthalmology department in London, reminding them of their appointments. This group acted as the intervention group. Controls were patients with scheduled ophthalmology appointments who did not receive an SMS or any alternative reminder. Results During the period of the study, 11.2% (50/447 of patients who received an SMS appointment reminder were non-attenders, compared to 18.1% (1720/9512 who did not receive an SMS reminder. Non-attendance rates were 38% lower in patients who received an SMS reminder than in patients who did not receive a reminder (RR of non-attendance = 0.62; 95% CI = 0.48 – 0.80. Conclusion The use of SMS reminders for ophthalmology outpatient appointments was associated with a reduction of 38% in the likelihood of patients not attending their appointments, compared to no appointment reminder. The use of SMS reminders may also be more cost-effective than traditional appointment reminders and require less labour. These findings should be confirmed with a more rigorous study design before a wider roll-out.

  13. Materials qualification for nuclear power plants

    International Nuclear Information System (INIS)

    Braconi, F.

    1987-01-01

    The supply of materials to be used in the fabrication of components submitted to pressure destined to Atucha II nuclear power plant must fulfill the quality assurance requirements in accordance with the international standards. With the aim of promoting the national participation in CNA II, ENACE had the need to adapt these requirements to the national industry conditions and to the availability of official entities' qualification and inspection. As a uniform and normalized assessment for the qualification of materials did not exist in the country, ENACE had to develop a materials suppliers qualification system. This paper presents a suppliers qualification procedure, its application limits and the alternative procedures for the acceptance of individual stock and for the stock materials purchase. (Author)

  14. Missed medical appointment among hypertensive and diabetic ...

    African Journals Online (AJOL)

    Keywords: Missed medical appointments, Hypertensive, Diabetic outpatients, Medication adherence, ... 12 weeks, at 95 % confidence level and 5 % error margin, 300 hypertensive ... monthly income and health insurance status of respondents ...

  15. Unintended Consequences: How Qualification Constrains Innovation

    Science.gov (United States)

    Brice, Craig A.

    2011-01-01

    The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

  16. Establishment of an unrelated umbilical cord blood bank qualification program: ensuring quality while meeting Food and Drug Administration vendor qualification requirements.

    Science.gov (United States)

    Rabe, Fran; Kadidlo, Diane; Van Orsow, Lisa; McKenna, David

    2013-10-01

    Qualification of a cord blood bank (CBB) is a complex process that includes evaluation of multiple aspects of donor screening and testing, processing, accreditation and approval by professional cell therapy groups, and results of received cord blood units. The University of Minnesota Medical Center Cell Therapy Laboratory has established a CBB vendor qualification process to ensure the CBB meets established regulatory and quality requirements. The deployed qualification of CBBs is based on retrospective and prospective review of the CBB. Forty-one CBBs were evaluated retrospectively: seven CBBs were disqualified based on failed quality control (QC) results. Eight CBBs did not meet the criteria for retrospective qualification because fewer than 3 cord blood units were received and the CBB was not accredited. As of March 2012, three US and one non-US CBBs have been qualified prospectively. One CBB withdrew from the qualification process after successful completion of the comprehensive survey and subsequent failure of the provided QC unit to pass the minimum criteria. One CBB failed the prospective qualification process based on processing methods that were revealed during the paper portion of the evaluation. A CBB qualification process is necessary for a transplant center to manage the qualification of the large number of CBBs needed to support a umbilical cord blood transplantation program. A transplant center that has utilized cord blood for a number of years before implementation of a qualification process should use a retrospective qualification process along with a prospective process. © 2013 American Association of Blood Banks.

  17. Instrumentation qualification. Seismic qualification of C-E instrumentation equipment. Part One

    International Nuclear Information System (INIS)

    1977-05-01

    A summary of the C-E seismic qualification program utilized to demonstrate the seismic design adequacy of the instrumentation and control equipment used in C-E supplied Nuclear Steam Supply Systems (NSSS) is presented. The report is divided into two parts. Part One includes the equipment seismic requirements and a description of the qualification methods. Part Two lists the specific equipment by nuclear station in which it is used and the equipment test results are summarized in a standard data sheet format to facilitate review. The seismic requirements are based on individual contract commitments with C-E customers and the NRC Standard Review Plan, Section 3.10 ''Seismic Qualification of Category I Instrumentation and Electrical Equipment.'' Equipment is qualified for use in a seismic environment where damage potential to the equipment is less than or equal to that simulated seismic environment to which it has been qualified. The anticipated Safe Shutdown Earthquake (SSE) environment at the inservice location of equipment should be confirmed by each applicant as not exceeding that to which it is qualified

  18. Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2013-02-01

    The purpose of this report is to describe programs and tools for assessment of accomplished and documented qualification with respect to ageing of electrical equipment and for development of complimentary ageing management programs. In addition to description of complete programs for management of ageing, tools for validation of the status with regard to ageing of installed ('old') equipment and, where needed, for complementation of their qualification are also included. The report is restricted to safety related equipment containing ageing sensitive parts, mainly organic materials. To this category belong cables and cable joints and a number of equipment containing oils, seals (o-rings), etc. For equipment located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. The main part of this report deals with the qualification of such equipment. Some safety related equipment outside the containment can be located in areas where they are subjected to high temperature and other excessive environmental stresses during normal operation and in areas affected by an accident. Therefore, some material is given also on qualification of equipment located outside containment with better possibilities for frequent inspection and supervision. Part 1 of the report is an executive summary with a general review of the methodologies and their application. The more detailed description of the programs and underlying material, useful data, etc. is given in Part 2

  19. CNPC Appoints Chief Experts for Important Technological Projects

    Institute of Scientific and Technical Information of China (English)

    Zhao Jianzhong

    2006-01-01

    @@ On June 27th, China National Petroleum Corporation (CNPC) held a public recruitment to appoint chief experts in Beijing for its important technological projects, which is the first time for CNPC to appoint chief managers by the means of competitive recruitment. This recruitment covers four projects, such as drilling, logging, geophysical survey and ground engineering with 15 projects. Of those,there are 8 drilling projects, which make up 50 percent of all the important technological projects for public recruitment. CNPC expects to further boost the chief expert responsibility system and promote the research and development (R&D) of technological project on the basis of the public recruitment. The company completes the recruitment following the procedure of making announcement, conducting competitive recruitment and giving publicity. On July 25th, the appointment ceremony was held by CNPC and 15 experts were awarded the certificates. CNPC is entering a new stage for the implementation of the technology and talent strategy for the 11th Five-Year Plan. What's more, a new management mode is taking shape for the technological project and for the construction of technological personnel pool.

  20. Environmental Qualification Program for NPP Krsko

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Spalj, S.; Colovic, G.

    1998-01-01

    The functionality the equipment important to safety is deteriorated during its service due to ageing and harsh environment conditions. Since the environment is a potential for common cause failures, the purpose of Environmental Qualification (EQ) is to demonstrate the capability of safety-related equipment to perform its safety function in aged conditions and under extreme conditions after design bases event (DBE). EQ is one of the steps in licensing process according to US regulatory documents and standards (10CFR50.49, RG 1.89, NUREG-0588, IEEE-323). This paper presents the efforts in establishing the EQ program in the Krsko nuclear power plant. (author)

  1. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  2. On relaxing the Mangasarian-Fromovitz constraint qualification

    Czech Academy of Sciences Publication Activity Database

    Kruger, A.Y.; Minchenko, L.; Outrata, Jiří

    2014-01-01

    Roč. 18, č. 1 (2014), s. 171-189 ISSN 1385-1292 R&D Projects: GA ČR GAP402/12/1309 Institutional support: RVO:67985556 Keywords : Nonlinear programming * Regularity conditions * Constraint qualifications * Lagrange multipliers * Mangasarian–Fromovitz constraint qualification * Constant rank constraint qualification Subject RIV: BA - General Mathematics Impact factor: 0.679, year: 2014 http://library.utia.cas.cz/separaty/2014/MTR/outrata-0426110.pdf

  3. New appointments at the IAEA

    International Nuclear Information System (INIS)

    1999-01-01

    The document shortly presents the following new appointments: the Deputy Director General, Head of the Department of Safeguards (effective as of 1 May 1999), the Director of the Division of Nuclear Fuel Cycle and Waste Technology in the Department of Nuclear Energy, and the Director of the Division of Conference and Document Services in the Department of Administration (effective as of 1 April 1999)

  4. Nuclear Criticality Safety Department Qualification Program

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1996-01-01

    The Nuclear Criticality Safety Department (NCSD) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSD technical and managerial qualification as required by the Y-1 2 Training Implementation Matrix (TIM). This Qualification Program is in compliance with DOE Order 5480.20A and applicable Lockheed Martin Energy Systems, Inc. (LMES) and Y-1 2 Plant procedures. It is implemented through a combination of WES plant-wide training courses and professional nuclear criticality safety training provided within the department. This document supersedes Y/DD-694, Revision 2, 2/27/96, Qualification Program, Nuclear Criticality Safety Department There are no backfit requirements associated with revisions to this document

  5. Characteristics of the visual response in archery different qualifications 14–16 years

    Directory of Open Access Journals (Sweden)

    Nina Mylchenko

    2014-08-01

    Full Text Available Purpose: levels of simple visually motor reaction at archers of various qualification are defined. Materials and methods: 15 shooters took part in research from onions of various qualification. Used the software Complex-reaction for definition of visual reaction Results: average values in groups on simple visually motor reaction to neurodynamic functions at athletes of a different floor who specialize in difficult and coordination types sports are defined. Conclusions: during experiment the group of candidates for the master of sports showed stabler result, the group of 1 categories showed the best result in reaction speed, but results significantly differ. The group of 2 categories showed average results in the test that testifies to insignificant level of preparation.

  6. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  7. Next Generation Qualification: Nanometrics T120PH Seismometer Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Merchant, Bion J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Slad, George William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    Sandia National Laboratories has tested and evaluated three seismometers, the Trillium 120PH, manufactured by Nanometrics. These seismometers measure broadband ground velocity using a UVW configuration with feedback control in a mechanically levelled borehole package. The purpose of the seismometer evaluation was to determine a measured sensitivity, response, self- noise, dynamic range, and self-calibration ability. The Nanometrics Trillium 120PH seismometers are being evaluated for the U.S. Air Force as part of their Next Generation Qualification effort.

  8. FPGA and Software Design for the Qualification and Automated tests for the production of CERN Digital Acquisition Boards

    CERN Document Server

    Laroussi, H; Lefevre, T; Degeest, A; Garcia, S; Tichon, J

    The VFC-HPC is an FPGA-based multipurpose board designed to be the new standard back-end for the Beam Instrumentation (BI) Group. This contribution is aimed to give a presentation of the test and qualification system designed to be used to verify the compliance of the VFC-HPC to the specifications. We will begin by presenting the CERN, the company, its main purpose and its brief history. Afterward, we will present the VFC-HPC, the purpose of this board and its mains characteristics. We will then focus on the work done to allow the test and qualification of the VFC-HPC. This project was focused on the test and qualification of the connectivity of the board, consisting of the FMC Connector and the SFPs. This work involved making several market surveys to choose the proper test components to be used (as FMC Mezzanines), setting up a test bench, implementing optical communications through SFPs, writing Verilog firmwares, writing software test routines in Python and measuring Bit Error Rates (BER) and eye diagrams...

  9. Equal Opportunity? Gender Gaps in CEO Appointments and Executive Pay

    OpenAIRE

    Keloharju, Matti; Knüpfer, Samuli; Tåg, Joacim

    2016-01-01

    This paper uses exceptionally rich data on Swedish corporate executives and their personal characteristics to study gender gaps in CEO appointments and pay. Both gaps are sizeable: 18% for CEO appointments and 27% for pay. At most one-eight of the gaps can be attributed to observable gender differences in executives' and their firms' characteristics. Further tests suggest that unobservable gender differences in characteristics are unlikely to account for the remaining gaps. Instead, our resul...

  10. TOUGH2 software qualification

    Energy Technology Data Exchange (ETDEWEB)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM ({open_quotes}MULti-KOMponent{close_quotes}) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2.

  11. TOUGH2 software qualification

    International Nuclear Information System (INIS)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM (open-quotes MULti-KOMponentclose quotes) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2

  12. Reduction of missed appointments at an urban primary care clinic: a randomised controlled study

    Directory of Open Access Journals (Sweden)

    Calmy Alexandra

    2010-10-01

    Full Text Available Abstract Background Missed appointments are known to interfere with appropriate care and to misspend medical and administrative resources. The aim of this study was to test the effectiveness of a sequential intervention reminding patients of their upcoming appointment and to identify the profile of patients missing their appointments. Methods We conducted a randomised controlled study in an urban primary care clinic at the Geneva University Hospitals serving a majority of vulnerable patients. All patients booked in a primary care or HIV clinic at the Geneva University Hospitals were sent a reminder 48 hrs prior to their appointment according to the following sequential intervention: 1. Phone call (fixed or mobile reminder; 2. If no phone response: a Short Message Service (SMS reminder; 3. If no available mobile phone number: a postal reminder. The rate of missed appointment, the cost of the intervention, and the profile of patients missing their appointment were recorded. Results 2123 patients were included: 1052 in the intervention group, 1071 in the control group. Only 61.7% patients had a mobile phone recorded at the clinic. The sequential intervention significantly reduced the rate of missed appointments: 11.4% (n = 122 in the control group and 7.8% (n = 82 in the intervention group (p 1year (OR 2.2; CI: 1.15-4.2, substance abuse (2.09, CI 1.21-3.61, and being an asylum seeker (OR 2.73: CI 1.22-6.09. Conclusion A practical reminder system can significantly increase patient attendance at medical outpatient clinics. An intervention focused on specific patient characteristics could further increase the effectiveness of appointment reminders.

  13. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  14. Qualification tests for a dosimetry system

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The report of qualification tests for personnel dosemeters is detailed. Qualification test for the energy response and the incidence angle is given. The procedure of test is resumed. Different coefficients of conversion used in these tests are given in tables. (N.C.)

  15. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  16. The Reliability of Results from National Tests, Public Examinations, and Vocational Qualifications in England

    Science.gov (United States)

    He, Qingping; Opposs, Dennis

    2012-01-01

    National tests, public examinations, and vocational qualifications in England are used for a variety of purposes, including the certification of individual learners in different subject areas and the accountability of individual professionals and institutions. However, there has been ongoing debate about the reliability and validity of their…

  17. Inspection qualification and implementation of ENIQ in Sweden

    International Nuclear Information System (INIS)

    Zettervall, Tommy

    2013-01-01

    Many countries are currently considering their approaches to inspection qualification and risk-informed in-service inspection (RI-ISI) and are carefully assessing experience data. In Europe most of the utilities operating nuclear power plants have joined together to form the European Network for Inspection Qualification ENIQ. In practice, qualification can be performed with varying degrees of complexity and cost, varying from capability statement based on existing evidence, through to an extensive qualification consisting of a detailed Technical Justification (TJ) together with open and blind trials on full-scale test blocks. An Inspection Qualification is an investigation and demonstration, which confirm that an inspection system has the ability to solve its specific tasks. The qualification is a Quality Assurance of an inspection system based on documents and practical trials. A reliable inspection system, based on a reliable qualification and correct prerequisites, will reduce total costs for Licensees and increase the credibility of the inspection result. To get such inspection system, which could be valid for many years, it's of necessity to fulfil all included parts in the process. It begins with the Technical Specification from Licensee, where input data and requirements about the actual component are specified. To get an inspection system that could live over time, the Technical Justification is of importance. Finally the test blocks and used simulation techniques play an important part of the final result, and these test blocks together with TJ form the basis for qualification body's decision. (author)

  18. THYC qualification on Vatican-1 low pressure tests

    International Nuclear Information System (INIS)

    Duval, C.; Guichard, J.

    1991-06-01

    PWR cores or fuel assemblies are components of a nuclear power plant involving single and two-phase flows in rod bundles. The knowledge of the detailed two-phase and three-dimensional flow patterns is necessary to evaluate the singularity (grids) and bypass effects on the Departure from Nucleate Boiling (DNB) in reactor cores during incidental transients. For that purpose, since 1989, the VATICAN experiment has been performed at EDF as a part of the qualification program of the three-dimensional computer code THYC, developed by EDF. The qualification strategy of the THYC software for PWR cores is the following: assuming the theoretical or experimental knowledge of regular and singular pressure drops and grid turbulence sources in single-phase, pressure drop multipliers and relative velocity in two-phase flow, the VATICAN experiment allows to evaluate the diffusion phenomena in two-phase flow. It provides thermalhydraulic measurements on a mock-up of a part of 900 MWe PWR fuel assembly in single and two-phase flows, with power and quality gradients. The first configuration of the mock-up, with simple spacer grids, is studied (VATICAN-1). The specific effects of mixing spacer grids will be compared to these data through a second configuration. The last void fraction measurements, using a γ-ray technique, performed on VATICAN-1 low pressure tests allowed to qualify a set of closure relations, particularly a model of little two-phase diffusion, adapted to two-phase flows at low pressure (5.0MPa). The qualification of subcooled boiling and diffusion models will continue on next VATICAN and other experimental campaigns [fr

  19. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  20. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  1. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  2. Qualification criteria for persons responsible for radiation protection

    International Nuclear Information System (INIS)

    Wehner, G

    1980-01-01

    A survey of the qualification criteria included in the German atomic law (Atomic Energy Act, Radiological Protection Ordinance and X-ray Protection Ordinance) for persons responsible for radiation protection is given. Especially the various activities for which a health physics officer is required, the range of qualification in each case and the way the qualification has to be proved, are pointed out. Also the different guides that are issued to complete the legal requirements are mentioned. The definitions of the term qualification for health physics given in the different guides are cited and it is shown, that the qualification of a healt physics officer has to be based on the three criteria (I) vocational training. (II) professional experience and (III) the necessary knowledge in radiation protection. (orig./HP) [de

  3. Next Generation Qualification: Kinemetrics STS-5A Seismometer Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Merchant, Bion John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Slad, George William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    Sandia National Laboratories has tested and evaluated two seismometers, the STS-5A, manufactured by Kinemetrics. These seismometers measure three axes of broadband ground velocity using a UVW configuration with feedback control in a mechanically levelled borehole package. The purpose of the seismometer evaluation was to determine a measured sensitivity, response, self-noise, dynamic range, and self-calibration ability. The Kinemetrics STS-5A seismometers are being evaluated for the U.S. Air Force as part of their Next Generation Qualification effort.

  4. [Principles of nutrition in patients with newly appointed stoma].

    Science.gov (United States)

    Pachocka, Lucyna Małgorzata; Urbanik, Anna

    2016-01-01

    The treatment of intestinal stoma is often a difficult experience for patients and results in numerous problems in the physical, psychological and social aspects. Therefore, post-operative care of the patient with the newly appointed stoma should be taken by therapeutic team consisting of doctors, nurses, physiotherapists, dieticians, psychologists and social workers. Appropriate nutritional education of patients aims to improve their quality of life and to prevent from unpleasant ailments formed after the operation. The specific type of stoma may decide about certain dietary recommendations. The presented work provides a practical dietary recommendations for patients with newly appointed stoma.

  5. Assessment of the Correlation between Appointment Scheduling and Patient Satisfaction in a Pediatric Dental Setup

    Directory of Open Access Journals (Sweden)

    Amar N. Katre

    2014-01-01

    Full Text Available Introduction. The practice of modern pediatric dentistry requires delivery of quality care in combination with adherence to excellent business as well as time management principles. A definite appointment schedule should be presented to the parents on the first or second appointment. More importantly, the prescribed schedule should be followed to the best of the professional abilities of the pediatric dentist. Aims. The aim of the study was to assess the co-relation between appointment scheduling and patient satisfaction in a pediatric dental setup with the objective of understanding the parameters related to appointment scheduling to increase patient satisfaction. Method. A total of 40 patients, who visited the Department of Pediatric and Preventive Dentistry, YMT Dental College & Hospital, for dental treatment were selected on a random basis. A questionnaire with a set of 6 questions with a rating scale of 1–5 to assess the patient satisfaction related to appointment scheduling was prepared. Results. A significant number of the patients were happy with the existing appointment scheduling system barring a few exceptions.

  6. Safety design guides for environmental qualification for CANDU 9

    International Nuclear Information System (INIS)

    Lee, Duk Su; Chang, Woo Hyun; Lee, Nam Young; A. C. D. Wright

    1996-03-01

    This safety design guide describes the safety philosophy and requirements for the environmental qualification of safety related systems and components for CANDU 9. The environmental qualification program identifies the equipments to be qualified and conditions to be used for qualification and provides comprehensive set of documentation to ensure that the qualification is complete and can be maintained for the life of the plant. A summary of the system, components and structures requiring environmental qualification is provided in the table for the guidance of the system design, and this table will be subject to change or confirmation by the environmental qualification program. Also, plant ares subject to harsh environment is provided in the figure. The change status of the regulatory requirements, code and standards should be traced and this safety design guide shall be updated accordingly. 1 tab., 5 figs. (Author) .new

  7. Impact of Checklist Use on Wellness and Post-Elective Surgery Appointments in a Veterinary Teaching Hospital.

    Science.gov (United States)

    Ruch-Gallie, Rebecca; Weir, Heather; Kogan, Lori R

    Cognitive functioning is often compromised with increasing levels of stress and fatigue, both of which are often experienced by veterinarians. Many high-stress fields have implemented checklists to reduce human error. The use of these checklists has been shown to improve the quality of medical care, including adherence to evidence-based best practices and improvement of patient safety. Although it has been recognized that veterinary medicine would likely demonstrate similar benefits, there have been no published studies to date evaluating the use of checklists for improving quality of care in veterinary medicine. The purpose of the current study was to evaluate the impact of checklists during wellness and post-elective surgery appointments conducted by fourth-year veterinary students within their Community Practice rotation at a US veterinary teaching hospital. Students were randomly assigned to one of two groups: those who were specifically asked to use the provided checklists during appointments, and those who were not asked to use the checklists but had them available. Two individuals blinded to the study reviewed the tapes of all appointments in each study group to determine the amount and type of medical information offered by veterinary students. Students who were specifically asked to use the checklists provided significantly more information to owners, with the exception of keeping the incision clean. Results indicate the use of checklists helps students provide more complete information to their clients, thereby potentially enhancing animal care.

  8. Qualification of the neutronic evolution of LWR fuels in MELUSINE

    International Nuclear Information System (INIS)

    Beretz, D.; Garcin, J.; Ducros, G.; Vanhumbeeck, D.; Chaucheprat, P.

    1984-09-01

    MELUSINE, a swimming pool type reactor, in Grenoble, for research and technological irradiations is well fitted to the neutronic evolution qualification of the LWR fuel. Thus, with an adjustment of the lattice pitch, representative neutron spectrum locations are available. The re-leading management and the regulation mode flexibility of MELUSINE lead to reproductible neutronic parameters configurations without restricting the reactor to this purpose only. Under these conditions, simple calculations can be carried out for interpretation, without taking into account the whole core. An instrumentation by Self Power Neutron Detectors (collectrons) gives on-line information on the fluxes at the periphery of the device. When required by the neutronicians, experimental pins can be unloaded during the irradiation process and scanned on a gammametry bench immersed in the reactor-pool itself, before their isotopic composition analysis. Thus, within the framework of neutronic evolution qualification, are studied fuel pins for advanced assemblies for the light water reactors or their derivatives, with large advantages over irradiations in power reactors [fr

  9. Maintenance Appointments in Railway Rolling Stock Rescheduling

    NARCIS (Netherlands)

    J.C. Wagenaar (Joris); L.G. Kroon (Leo); M.E. Schmidt (Marie)

    2016-01-01

    textabstractThis paper addresses the Rolling Stock Rescheduling Problem (RSRP), while taking maintenance appointments into account. After a disruption, the rolling stock of the disrupted passenger trains has to be rescheduled in order to restore a feasible rolling stock circulation. Usually, a

  10. 77 FR 62490 - Performance Review Board Appointments

    Science.gov (United States)

    2012-10-15

    ... Board Appointments AGENCY: Office of Human Resource Management, Departmental Management. ACTION: Notice..., Director, Office of Human Resources Management, telephone: (202) 690-2994, email: [email protected] has a total of seven PRBs: The Secretary's PRB; Career Agency Head's PRB; Departmental Management and...

  11. 5 CFR 317.501 - Recruitment and selection for initial SES career appointment be achieved from the brightest and...

    Science.gov (United States)

    2010-01-01

    .... OPM may review proposed career appointments to ensure that they comply with all merit staffing... career appointment be achieved from the brightest and most diverse pool possible. 317.501 Section 317.501... EXECUTIVE SERVICE Career Appointments § 317.501 Recruitment and selection for initial SES career appointment...

  12. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  13. Solar array qualification through qualified analysis

    Science.gov (United States)

    Zijdemans, J.; Cruijssen, H. J.; Wijker, J. J.

    1991-04-01

    To achieve qualification is in general a very expensive exercise. For solar arrays this is done by a dedicated test program through which final qualification is achieved. Due to severe competition on the solar array market, cheaper means are looked for to achieve a qualified product for the customers. One of the methods is to drastically limit the environmental test program and to qualify the solar-array structure against its environmental loads by analysis. Qualification by analysis is possible. The benefits are that a significant amount of development effort can be saved in case such a powerful tool is available. Extensive testing can be avoided thus saving time and money.

  14. Implementation plans for the Korean certified tumor registrar qualification system.

    Science.gov (United States)

    Boo, Yoo-Kyung; Lim, Hyun-Sook; Won, Young-Joo

    2014-01-01

    Cancer registration data is used to understand the nation's cancer burden, and to provide significant baseline data for cancer control efforts, as well as, research on cancer incidence, mortality, survival, and prevalence. A system that approves, assesses, and manages the qualification of specialists, responsible for performing cancer registration, has not been developed in Korea. This study presents ways to implement a certification system designed for the qualification of tumor registrars in Korea. Requirements for implementing a certified tumor registrar qualification system were determined by reviewing the system for establishing qualifications in Korea and the American qualification system via the National Cancer Registrars Association (NCRA). Moreover, a survey was conducted on Korean medical records administrators, who had taken the U.S. Certified Tumor Registrar (CTR) examination, in order to review their opinions regarding these requirements. This study verified the feasibility of a qualification examination based on the opinions of CTR specialists by determining the following: items, and the associated ratings, of the qualifications necessary to register individuals as certified tumor registrars in a private qualification system; status of human resources required for the examination or training processes; plans regarding the organization needed for management, and operation of qualifications, examination standards, subject areas, examination methods, examination qualifications, or education and training programs. The implementation of a certified tumor registrar qualification system will lead to enhanced job competency for specialists and a qualitative improvement of cancer registration data. It will also reliably foster human resources that will lay the groundwork needed to establish scientific and reasonable national cancer management policies.

  15. Qualification, certification and training of quality assurance personnel

    International Nuclear Information System (INIS)

    Ribeiro da Costa, J.

    1982-01-01

    The qualification and certification of technical personnel for activities related to nuclear quality is one of the most critical problems in developing countries which use nuclear power for peaceful purposes. A careful analysis of industrial quality levels is required in order to determine existing weaknesses, to correct deviations and to regulate quality-related activities so that nuclear power programmes can be implemented with no difficulties other than those inherent in the very complexity of nuclear technology. In this connection, indoctrination, training and qualification of technical personnel, in line with the requirements to quality assurance (QA), are tasks which must be undertaken right at the outset, taking into account the country's stage of technological development, its objectives and the necessity to increase its direct participation in QA activities in the shortest possible time. The paper shows how the problem was approached in Brazil, beginning with an analysis of the situation of industry in this field, the evolution of QA training programmes through several stages, leading to systematic training in the field of nuclear quality and, finally, the introduction of training in the more specific and sophisticated field of nuclear reliability. (author)

  16. Approach to customer qualification of the BNFL Sellafield Mox Plant

    International Nuclear Information System (INIS)

    Sullivan, P.

    2003-01-01

    BNFL started plutonium commissioning of its Sellafield MOX Plant (SMP) in December 2001, with the first MOX pellets being produced in May 2002. SMP was designed to manufacture a range of both PWR and BWR fuel types for a number of different customers. During commissioning and early MOX fuel manufacturing BNFL has been demonstrating its ability to both automatically manufacture and inspect MOX fuel to meet the requirements of different customers' specifications and fuel types. The qualification project consisted of common and project specific qualification. Common qualification was carried out to demonstrate BNFL could meet several customers' requirements during the same qualification test. Project specific qualification was carried out for one customer only as the fabrication or inspection equipment was specific to their fuel type. An example is the fuel assembly process. The reasons for BNFL carrying out common qualification were: - Develop a common qualified process to meet different customer specifications. - Minimise future qualifications prior to starting future fuel campaigns. - Ensure BNFL understands and effectively manages different customer requirements in SMP. BNFL has approached qualification of SMP systematically. Firstly the inspection system was qualified, and once completed the inspection system was then used in the qualification of the manufacturing process. (orig.)

  17. IEEE Std 600: IEEE trial-use standard requirements for organizations that conduct qualification testing of safety systems equipment for use in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The purpose of this standard is to provide requirements for establishing a program for conducting qualification tests of safety systems equipment used in nuclear power generating stations. Compliance with the requirements of this standard does not assure the adequacy of the qualification tests performed. This standard applies to organizations that conduct qualification tests on equipment that has a definable safety function and is an identifiable part of a safety system for use in nuclear power generating stations. It requires a technical program, a quality assurance program, and a demonstrated ability to meet specified technical requirements. It does not apply to materials tests, production tests, normal performance testing, qualification by analysis, qualification by operating experience, or reliability tests such as diesel-generator multiple start tests. The intent of this standard is to achieve greater consistency, reliability, and reproducibility of test results and to provide adequate control of qualification testing of safety systems equipment

  18. 49 CFR 214.351 - Training and qualification of flagmen.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification of flagmen. 214.351... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.351 Training and qualification of flagmen. (a) The training and qualification for roadway workers assigned the...

  19. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  20. 76 FR 78225 - Notice of Appointment of Members to the National Agricultural Research, Extension, Education, and...

    Science.gov (United States)

    2011-12-16

    ... (Appointment--3 years); Category H. ``National Food Science Organization, Dr. Mark R. McLellan, Member... specific category related to agriculture. The Board was first appointed in September 1996 and at the time... member is appointed by the Secretary of Agriculture to a specific category on the Board, including...

  1. Modeling Patient No-Show History and Predicting Future Outpatient Appointment Behavior in the Veterans Health Administration.

    Science.gov (United States)

    Goffman, Rachel M; Harris, Shannon L; May, Jerrold H; Milicevic, Aleksandra S; Monte, Robert J; Myaskovsky, Larissa; Rodriguez, Keri L; Tjader, Youxu C; Vargas, Dominic L

    2017-05-01

    Missed appointments reduce the efficiency of the health care system and negatively impact access to care for all patients. Identifying patients at risk for missing an appointment could help health care systems and providers better target interventions to reduce patient no-shows. Our aim was to develop and test a predictive model that identifies patients that have a high probability of missing their outpatient appointments. Demographic information, appointment characteristics, and attendance history were drawn from the existing data sets from four Veterans Affairs health care facilities within six separate service areas. Past attendance behavior was modeled using an empirical Markov model based on up to 10 previous appointments. Using logistic regression, we developed 24 unique predictive models. We implemented the models and tested an intervention strategy using live reminder calls placed 24, 48, and 72 hours ahead of time. The pilot study targeted 1,754 high-risk patients, whose probability of missing an appointment was predicted to be at least 0.2. Our results indicate that three variables were consistently related to a patient's no-show probability in all 24 models: past attendance behavior, the age of the appointment, and having multiple appointments scheduled on that day. After the intervention was implemented, the no-show rate in the pilot group was reduced from the expected value of 35% to 12.16% (p value < 0.0001). The predictive model accurately identified patients who were more likely to miss their appointments. Applying the model in practice enables clinics to apply more intensive intervention measures to high-risk patients. Reprint & Copyright © 2017 Association of Military Surgeons of the U.S.

  2. Mentorship for newly appointed physicians: a strategy for enhancing patient safety?

    Science.gov (United States)

    Harrison, Reema; McClean, Serwaa; Lawton, Rebecca; Wright, John; Kay, Clive

    2014-09-01

    Mentorship is an increasingly popular innovation from business and industry that is being applied in health-care contexts. This paper explores the concept of mentorship for newly appointed physicians in their first substantive senior post, and specifically its utilization to enhance patient safety. Semi-structured face to face and telephone interviews with Medical Directors (n = 5), Deputy Medical Directors (n = 4), and Clinical Directors (n = 6) from 9 acute NHS Trusts in the Yorkshire and Humber region in the north of England. A focused thematic analysis was used. A number of beneficial outcomes were associated with mentorship for newly appointed physicians including greater personal and professional support, organizational commitment, and general well-being. Providing newly appointed senior physicians with support through mentorship was considered to enhance the safety of patient care. Mentorship may prevent or reduce active failures, be used to identify threats in the local working environment, and in the longer term, address latent threats to safety within the organization by encouraging a healthier safety culture. Offering mentorship to all newly appointed physicians in their first substantive post in health care may be a useful strategy to support the development of their clinical, professional, and personal skills in this transitional period that may also enhance the safety of patient care.

  3. The Impact of Health Care Appointment Non-Adherence on Graft Outcomes in Kidney Transplantation.

    Science.gov (United States)

    Taber, David J; Fleming, James N; Fominaya, Cory E; Gebregziabher, Mulugeta; Hunt, Kelly J; Srinivas, Titte R; Baliga, Prabhakar K; McGillicuddy, John W; Egede, Leonard E

    2017-01-01

    Non-adherence to medication is a well-studied and known cause of late allograft loss, but it is difficult to measure and prospectively monitor. The aim of this study was to assess if appointment non-adherence was correlated with medication non-adherence and a predictor of graft outcomes. This was a longitudinal cohort study that used the National United States Renal Data System and veterans affairs health records data with time-to-event analyses conducted to assess the impact on graft and patient survival. The number of transplants that were included in the analysis was 4,646 (3,656 with complete records); 14.6% of patients had an appointment no show rate of ≥12% (non-adherence). Appointment and medication non-adherence were highly correlated and both were significant independent predictors of outcomes. Those with appointment non-adherence had 1.5 times the risk of acute rejection (22.0 vs. 14.7%, p adherence; those with appointment and medication non-adherence were at very high risk of graft loss (aHR 4.18, 95% CI 3.39-5.15, p adherence (aHR 1.39, 95% CI 0.97-2.01, p = 0.0766) or only medication non-adherence (aHR 2.44, 95% CI 2.11-2.81, p adherence to health care appointments is a significant and independent risk factor for graft loss. © 2016 S. Karger AG, Basel.

  4. On safety 1E qualification of electrical equipment for nuclear power stations

    International Nuclear Information System (INIS)

    Segarceanu, D.; Geambasu, C.; Avramescu, M.

    1995-01-01

    Electrical equipment and systems for the emergency shutdown of a nuclear reactor are qualified according to safety class 1E. Methods of qualification meeting the requirements should be used, either individually or in combination include, type-test qualification, qualification by operating experience, qualification by analysis, combined qualification. These methods qualification principles, procedures and documents are discussed. (N.T.). 1 fig

  5. Men's Educational Group Appointments in Rural Nicaragua.

    Science.gov (United States)

    Campbell, Bruce B; Gonzalez, Hugo; Campbell, McKenzie; Campbell, Kent

    2017-03-01

    Men's preventive health and wellness is largely neglected in rural Nicaragua, where a machismo culture prevents men from seeking health care. To address this issue, a men's educational group appointment model was initiated at a rural health post to increase awareness about hypertension, and to train community health leaders to measure blood pressure. Men's hypertension workshops were conducted with patient knowledge pretesting, didactic teaching, and posttesting. Pretesting and posttesting performances were recorded, blood pressures were screened, and community leaders were trained to perform sphygmomanometry. An increase in hypertension-related knowledge was observed after every workshop and community health leaders demonstrated proficiency in sphygmomanometry. In addition, several at-risk patients were identified and follow-up care arranged. Men's educational group appointments, shown to be effective in the United States in increasing patient knowledge and satisfaction, appear to function similarly in a resource-constrained environment and may be an effective mechanism for reaching underserved men in Nicaragua.

  6. Court Appointed Volunteers for Abused and Neglected Children.

    Science.gov (United States)

    Justin, Renate G.

    2002-02-01

    A court appointed special advocate (CASA) volunteer is a trained citizen who is appointed by a judge to represent the best interests of an abused and neglected child in court. An independent voice, the volunteer gathers information and reports to the court. The CASA volunteer works in close cooperation with other professionals, physicians, lawyers, social workers, and teachers to find the most suitable permanent placement for a victimized child, whether it be a foster home, parental home, or adoptive home. Another function for CASA volunteers is to be supportive to the child during a time of uncertainty in his or her life and to help the youngster adjust to new and changing situations; the CASA volunteer may be the only consistent adult presence during this difficult period of transition.

  7. Prevalence and Correlates of Missed First Appointments among ...

    African Journals Online (AJOL)

    In Nigeria, where mental health services are poorly organized, missed appointments and its resultant consequences may be burdensome. Aim: This ... However, having received previous treatment for a psychiatric illness (P = 0.02) and having ...

  8. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1994-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  9. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1993-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  10. Safety review for seismic qualification on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Fang Qingxian

    1995-01-01

    The standards and requirements for seismic qualification of nuclear power plant's component have been fully addressed, including the scope of seismic qualification, the approach and the method of common seismic qualification, the procedure of the seismic tests, and the criteria for the seismic qualification review. The problems discovered in the safety review and the solution for these problems and some other issues are also discussed

  11. Tom Brown appointed Dean of Students

    OpenAIRE

    Williams, Meghan

    2007-01-01

    James Thomas "Tom" Brown, former senior associate dean of the Dean of Students office, has been appointed as the Dean of Students. The Dean of Students office is responsible for the coordination of student advocacy, new student orientation and parent programs, and responding to student emergencies in collaboration with Judicial Affairs, Residence Life, Cook Counseling Center, Schiffert Health Center, and other departments and agencies.

  12. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

    to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... preferences, recipients should not respond to the applicant actually hired on the basis of their (the recipients') racial preferences. My account decomposes the meritocratic ideal into four separate norms, one of which applies to recipients rather than to selectors. Finally, it defends the view that reaction...... qualifications based on antimeritocratic reactions, while not unproblematic, are not entirely irrelevant from the point of view of merit. Notably, selectors need not discount them when no one - including the targets of the objectionable preferences - is unfairly disadvantaged. Because not all problematic...

  13. QUALIFICATIONS FRAMEWORKS FOR LIFELONG LEARNING CONQUERING THE WORLD?

    Directory of Open Access Journals (Sweden)

    Arjen Deij

    2014-01-01

    Full Text Available The paper reveals the international prospects of developing and spreading the qualifications frameworks across the globe. It introduces the key terms and concepts related to the given issue, and examines both the benefits and challenges of qualifications frameworks implementation. The author looks into the origins and causes of the worldwide interest in qualifications framework application, and gives the overview of related recent publications and their conclusions to reinforce the provided argumentation.

  14. Qualification of safety-related valve actuators

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This Standard describes the qualification of all types of power-driven valve actuators, including damper actuators, for safety-related functions in nuclear power generating stations. It may also be used to separately qualify actuator components. This Standard establishes the minimum requirements for, and guidance regarding, the methods and procedures for qualification of all safety-related functions of power-driven valve actuators

  15. LTP fibre injector qualification and status

    International Nuclear Information System (INIS)

    Bogenstahl, J; Cunningham, L; Fitzsimons, E D; Hough, J; Killow, C J; Perreur-Lloyd, M; Robertson, D; Rowan, S; Ward, H

    2009-01-01

    This paper presents the current state of the LISA Technology Package (LTP) fibre injector qualification project in terms of vibration and shock tests. The fibre injector is a custom built part and therefore must undergo a full space qualification process. The mounting structure and method for sinusoidal vibration and random vibration tests as well as shock tests will be presented. Furthermore a proposal will be presented to use the fibre injector pair qualification model to build an optical prototype bench. The optical prototype bench is a full-scale model of the flight model. It will be used for development and rehearsal of all the assembly stages of the flight model and will provide an on-ground simulator for investigation as an updated engineering model.

  16. Qualification of software and hardware

    International Nuclear Information System (INIS)

    Gossner, S.; Schueller, H.; Gloee, G.

    1987-01-01

    The qualification of on-line process control equipment is subdivided into three areas: 1) materials and structural elements; 2) on-line process-control components and devices; 3) electrical systems (reactor protection and confinement system). Microprocessor-aided process-control equipment are difficult to verify for failure-free function owing to the complexity of the functional structures of the hardware and to the variety of the software feasible for microprocessors. Hence, qualification will make great demands on the inspecting expert. (DG) [de

  17. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    International Nuclear Information System (INIS)

    Sarkimo, M.; Pitkaenen, J.

    2013-12-01

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  18. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sarkimo, M. [VTT Technical Research Centre of Finland, Espoo (Finland); Pitkaenen, J.

    2013-12-15

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  19. Assessment of the Correlation between Appointment Scheduling and Patient Satisfaction in a Pediatric Dental Setup

    OpenAIRE

    Katre, Amar N.

    2014-01-01

    Introduction. The practice of modern pediatric dentistry requires delivery of quality care in combination with adherence to excellent business as well as time management principles. A definite appointment schedule should be presented to the parents on the first or second appointment. More importantly, the prescribed schedule should be followed to the best of the professional abilities of the pediatric dentist. Aims. The aim of the study was to assess the co-relation between appointment schedu...

  20. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  1. Prevalence and Correlates of Missed First Appointments among ...

    African Journals Online (AJOL)

    quality of care, results in poor treatment outcomes and drains financial resources. In Nigeria, where mental .... and physical aggression. Each subscale has four .... missed first appointments observed in this study falls within the range of 17 and ...

  2. Reasons for and consequences of missed appointments in general practice in the UK: questionnaire survey and prospective review of medical records

    Directory of Open Access Journals (Sweden)

    Lawlor Debbie A

    2005-11-01

    Full Text Available Abstract Background Missed appointments are a common occurrence in primary care in the UK, yet little is known about the reasons for them, or the consequences of missing an appointment. This paper aims to determine the reasons for missed appointments and whether patients who miss an appointment subsequently consult their general practitioner (GP. Secondary aims are to compare psychological morbidity, and the previous appointments with GPs between subjects and a comparison group. Methods Postal questionnaire survey and prospective medical notes review of adult patients missing an appointment and the comparison group who attended appointments over a three week period in seven general practices in West Yorkshire. Results Of the 386 who missed appointments 122 (32% responded. Of the 386 in the comparison group 223 (58% responded, resulting in 23 case-control matched pairs with complete data collection. Over 40% of individuals who missed an appointment and participated said that they forgot the appointment and a quarter said that they tried very hard to cancel the appointment or that it was at an inconvenient time. A fifth reported family commitments or being too ill to attend. Over 90% of the patients who missed an appointment subsequently consulted within three months and of these nearly 60% consulted for the stated problem that was going to be presented in the missed consultation. The odds of missing an appointment decreased with increasing age and were greater among those who had missed at least one appointment in the previous 12 months. However, estimates for comparisons between those who missed appointments and the comparison group were imprecise due to the low response rate. Conclusion Patients who miss appointments tend to cite practice factors and their own forgetfulness as the main reasons for doing so, and most attend within three months of a missed appointment. This study highlights a number of implications for future research. More work

  3. Europeans come together on qualification

    International Nuclear Information System (INIS)

    Whittle, J.

    1996-01-01

    Utilities operating nuclear power plants in Europe have formed the European Network for Inspection Qualification (ENIQ) to produce a common approach to demonstrating that non-destructive testing is capable providing the information to ensure the absence of significant defects in nuclear plants. Major developments over recent months have included the issue by ENIQ of a formal document defining the methodology for the conduct of qualification which sets out the principles that detailed systems, within an individual country context, should embody. A pilot study on pipe welds typical of those in BWR recirculation loops is being conducted to explore the issues involved in the practical application of the methodology. In parallel with ENIQ, the European Nuclear Regulators Working Group has set up a Task Force in an attempt to define a common regulatory position on non-destructive testing qualifications and has produced its own document which is wider in scope than that of ENIQ. (UK)

  4. A TIMELY APPOINTMENT – SAMA'S NEW CEO

    African Journals Online (AJOL)

    Nicky

    Her middle name might mean 'the one who came before her time', but Dr. Aquina Motlakapele Thulare, 42, the new CEO of the South African Medical. Association, is determined to see doctors better paid and properly valued during her tenure. Ratified by the full board last month, her historic appointment follows the.

  5. Strategy for Qualification of the Plutonium Immobilized Form

    International Nuclear Information System (INIS)

    Marra, J.C.; Marra, S.L.; Bibler, N.E.; Strachan, D.M.; Shaw, H.F.

    1998-01-01

    In order to dispose of a radioactive waste form in a federal high- level waste repository, a waste form qualification strategy and program must be developed. The waste form qualification program must include the acceptance specifications for the product, show how compliance with these specifications will be met, and then demonstrate compliance. An important element of this program is developing a measure to demonstrate product consistency. For the can- in-canister option, waste form qualification is needed not only for the Pu immobilized form but also for the high-level waste glass canister containing the Pu waste form. The latter will require close interaction and coordination with the U.S. Department of Energy - Office of Environmental Management (DOE-EM) who, through their contractor at the Savannah River Site (SRS), is the producer of the high-level waste form at the Defense Waste Processing Facility (DWPF). In this paper a waste form qualification strategy for the plutonium ceramic form is described that utilizes, as much as possible, the qualification strategy successfully used for vitrified high-level waste

  6. Missed or Delayed Medical Care Appointments by Older Users of Nonemergency Medical Transportation

    Science.gov (United States)

    MacLeod, Kara E.; Ragland, David R.; Prohaska, Thomas R.; Smith, Matthew Lee; Irmiter, Cheryl; Satariano, William A.

    2015-01-01

    Purpose of the Study: This study identified factors associated with canceling nonemergency medical transportation appointments among older adult Medicaid patients. Design and Methods: Data from 125,913 trips for 2,913 Delaware clients were examined. Mediation analyses, as well as, multivariate logistic regressions were conducted. Results: Over half of canceled trips were attributed to client reasons (e.g., no show, refusal). Client characteristics (e.g., race, sex, functional status) were associated with cancelations; however, these differed based on the cancelation reason. Regularly scheduled trips were less likely to be canceled. Implications: The evolving American health care system may increase service availability. Additional policies can improve service accessibility and overcome utilization barriers. PMID:24558264

  7. Impact of Delayed Time to Advanced Imaging on Missed Appointments Across Different Demographic and Socioeconomic Factors.

    Science.gov (United States)

    Daye, Dania; Carrodeguas, Emmanuel; Glover, McKinley; Guerrier, Claude Emmanuel; Harvey, H Benjamin; Flores, Efrén J

    2018-05-01

    The aim of this study was to investigate the impact of wait days (WDs) on missed outpatient MRI appointments across different demographic and socioeconomic factors. An institutional review board-approved retrospective study was conducted among adult patients scheduled for outpatient MRI during a 12-month period. Scheduling data and demographic information were obtained. Imaging missed appointments were defined as missed scheduled imaging encounters. WDs were defined as the number of days from study order to appointment. Multivariate logistic regression was applied to assess the contribution of race and socioeconomic factors to missed appointments. Linear regression was performed to assess the relationship between missed appointment rates and WDs stratified by race, income, and patient insurance groups with analysis of covariance statistics. A total of 42,727 patients met the inclusion criteria. Mean WDs were 7.95 days. Multivariate regression showed increased odds ratio for missed appointments for patients with increased WDs (7-21 days: odds ratio [OR], 1.39; >21 days: OR, 1.77), African American patients (OR, 1.71), Hispanic patients (OR, 1.30), patients with noncommercial insurance (OR, 2.00-2.55), and those with imaging performed at the main hospital campus (OR, 1.51). Missed appointment rate linearly increased with WDs, with analysis of covariance revealing underrepresented minorities and Medicaid insurance as significant effect modifiers. Increased WDs for advanced imaging significantly increases the likelihood of missed appointments. This effect is most pronounced among underrepresented minorities and patients with lower socioeconomic status. Efforts to reduce WDs may improve equity in access to and utilization of advanced diagnostic imaging for all patients. Copyright © 2018. Published by Elsevier Inc.

  8. A web-based appointment system to reduce waiting for outpatients: a retrospective study.

    Science.gov (United States)

    Cao, Wenjun; Wan, Yi; Tu, Haibo; Shang, Fujun; Liu, Danhong; Tan, Zhijun; Sun, Caihong; Ye, Qing; Xu, Yongyong

    2011-11-22

    Long waiting times for registration to see a doctor is problematic in China, especially in tertiary hospitals. To address this issue, a web-based appointment system was developed for the Xijing hospital. The aim of this study was to investigate the efficacy of the web-based appointment system in the registration service for outpatients. Data from the web-based appointment system in Xijing hospital from January to December 2010 were collected using a stratified random sampling method, from which participants were randomly selected for a telephone interview asking for detailed information on using the system. Patients who registered through registration windows were randomly selected as a comparison group, and completed a questionnaire on-site. A total of 5641 patients using the online booking service were available for data analysis. Of them, 500 were randomly selected, and 369 (73.8%) completed a telephone interview. Of the 500 patients using the usual queuing method who were randomly selected for inclusion in the study, responses were obtained from 463, a response rate of 92.6%. Between the two registration methods, there were significant differences in age, degree of satisfaction, and total waiting time (P0.05). Being ignorant of online registration, not trusting the internet, and a lack of ability to use a computer were three main reasons given for not using the web-based appointment system. The overall proportion of non-attendance was 14.4% for those using the web-based appointment system, and the non-attendance rate was significantly different among different hospital departments, day of the week, and time of the day (Pweb-based appointment system could significantly increase patient's satisfaction with registration and reduce total waiting time effectively. However, further improvements are needed for broad use of the system.

  9. 49 CFR 214.349 - Training and qualification of watchmen/lookouts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification of watchmen/lookouts...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.349 Training and qualification of watchmen/lookouts. (a) The training and qualification for...

  10. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Smith, A.C.

    1999-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  11. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Van Alstine, M.N.

    1998-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  12. Integrated Information System for Higher Education Qualifications

    Directory of Open Access Journals (Sweden)

    Catalin Ionut SILVESTRU

    2012-10-01

    Full Text Available In the present article we aim to study thoroughly and detail aspects related to architectures specific for e-learning and management of human resources training interconnected to management of qualifications. In addition, we take into consideration combining e-learning architectures with software in an e-learning system interconnected with the National Registry of Qualifications of Higher Education, in view of developing and information system that correlates educational supply from higher education from Romania with labor market demands through qualifications. The scientific endeavor consists of original architectural solutions to integrate data, systems, processes, services from various sources and to use them in the proposed system. The practical result of the scientific endeavor is represented by design of architectures required for developing an e-learning system interconnected with the National Registry of Qualifications from Romania, which involve in first stage the qualifications provided by higher education. The proposed innovative solution consists in the fact that the proposed information system combines the advantages of content management system (CMS with learning content management system (LCMS and with reusable learning objects (RLO. Thus, the architecture proposed in the research ensures the integration of a content management system with a portal for information, guidance and support in making a professional project. The integration enables correlation of competences with content areas and specific items from various teaching subjects, thus evaluating the usefulness for this registry from learning/educational perspective. Using the proposed information system in enables correlation among qualifications, content of educational program and continuous self-evaluation opportunities, which facilitate monitoring of progress and adjustment of learning content.

  13. Developing competence based qualification system in the nuclear energy sector

    International Nuclear Information System (INIS)

    Ceclan, Mihail

    2016-01-01

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  14. Developing competence based qualification system in the nuclear energy sector

    Energy Technology Data Exchange (ETDEWEB)

    Ceclan, Mihail [European Commission, Petten (Netherlands). Inst. for Energy and Transport

    2016-04-15

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  15. 78 FR 75948 - Senior Executive Service; Appointment of Members to the Performance Review Board

    Science.gov (United States)

    2013-12-13

    ... Resources Center--Sydney T. Rose Executive Secretary--Director, Executive Resources--Kim L.H. Green... H. Moore, Deputy Assistant Secretary for Operations and Analysis--appointment expires on 09/30/16..., New York--appointment expires on 09/30/16 OLMS Stephen J. Willertz, Director, Office of Enforcement...

  16. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  17. Papike appointed Director of IOM

    Science.gov (United States)

    James Papike was appointed director of the Institute of Meteoritics in the Department of Geology and Presidential Professor at the University of New Mexico, Albuquerque, on July 1, 1990. Papike succeeded Klaus Keil, who moved to the University of Hawaii to direct the Planetary Geoscience Division at the Hawaii Institute of Geosciences.The newly constituted IOM will emphasize planetary volcanic processes through the study of achondritic meteorites, the Moon, and Earth, and the origin of primitive solar system materials and planetary formation through the study of chondritic meteorites.

  18. How much does a diabetes out-patient appointment actually cost? An argument for PLICS.

    Science.gov (United States)

    Grant, Paul

    2015-01-01

    The national tariff system for clinical processes and procedures aims to put a discrete unit cost on clinical activity. Calculating such costs can be subject to a great deal of local variation and interpretation. Given the rising costs of diabetes the purpose of this paper is to ask the question what does a diabetes outpatient appointment in the UK NHS actually cost? This is important in a time of financial austerity and healthcare rationing because it can be difficult to decipher the attribution of costs within the acute hospital setting. Exploring this question, the author considers the present cost model and analyse in terms of the language of unit model cost; the basic tariff system and how it works in diabetes and looking at internal cost information the author attempts to unbundle the cost to provide a more accurate value for the cost object. One major finding is that costs and overheads are divided arbitrarily as opposed to being distributed on the basis of measured relative consumption. Alternative costing methods are appraised to demonstrate that a patient level episodic costing approach such as patient level information and costing system (PLICS) which incorporates aspects of activity-based costing (ABC) would be far more appropriate. Using time driven ABC (TDABC), a new patient appointment costs £162 for 30 minutes and a follow-up appointment costs £81 for 15 minutes. PLICS has the added benefit of greater financial and clinical transparency and this goes some way towards the holy grail of greater engagement with the doctors delivering clinical care. It would appear that there are different purposes of different costing systems. One can argue that a costing system is there to both contain costs and divide overheads and demonstrate activity. Depending on how data are interpreted costing information can be an agent of enlightenment and behavioural modification for healthcare professionals to show them their direct and indirect costs, their capacity and

  19. Radiological Control Technician: Standardized technician Qualification Standard

    International Nuclear Information System (INIS)

    1992-10-01

    The Qualification Standard states and defines the knowledge and skill requirements necessary for successful completion of the Radiological Control Technician Training Program. The standard is divided into three phases: Phase I concerns RCT Academic training. There are 13 lessons associated with the core academics program and 19 lessons associated with the site academics program. The staff member should sign the appropriate blocks upon successful completion of the examination for that lesson or group of lessons. In addition, facility specific lesson plans may be added to meet the knowledge requirements in the Job Performance Measures (JPM) of the practical program. Phase II concerns RCT core/site practical (JPMs) training. There are thirteen generic tasks associated with the core practical program. Both the trainer/evaluator and student should sign the appropriate block upon successful completion of the JPM. In addition, facility specific tasks may be added or generic tasks deleted based on the results of the facility job evaluation. Phase III concerns the oral examination board successful completion of the oral examination board is documented by the signature of the chairperson of the board. Upon completion of all of the standardized technician qualification requirements, final qualification is verified by the student and the manager of the Radiological Control Department and acknowledged by signatures on the qualification standard. The completed Qualification Standard shall be maintained as an official training record

  20. 10 CFR 50.76 - Licensee's change of status; financial qualifications.

    Science.gov (United States)

    2010-01-01

    ... the financial qualifications information that would be required for obtaining an initial operating license as specified in § 50.33(f)(2). The financial qualifications information must address the first... 10 Energy 1 2010-01-01 2010-01-01 false Licensee's change of status; financial qualifications. 50...

  1. Test report: Electron-proton spectrometer qualification test unit, qualification test

    Science.gov (United States)

    Vincent, D. L.

    1972-01-01

    Qualification tests of the electron-proton spectrometer test unit are presented. The tests conducted were: (1) functional, (2) thermal/vacuum, (3) electromagnetic interference, (4) acoustic, (5) shock, (6) vibration, and (7) humidity. Results of each type of test are presented in the form of data sheets.

  2. Program plan for environmental qualification of mechanical and dynamic (including seismic) qualification of mechanical and electrical equipment program (EDQP)

    International Nuclear Information System (INIS)

    Weidenhamer, G.H.

    1986-06-01

    The equipment qualification program described in this plan is intended to provide the technical basis for resolving uncertainties in existing equipment qualification standards. In addition, research results are contributing to the resolution of safety issues GI-23, GI-87, USI-A44, titled, ''Reactor Coolant Pump Seal Failure,'' ''Failure of HPCI Steam Line Without Isolation,'' and ''Station Blackout,'' respectively. Also, research effort is being directed at providing information on the behavior of containment isolation valves under severe accident environments. Although the results of the latter research will not contribute to resolving uncertainties in qualification standards, it has proven cost effective to obtain this information under this program

  3. Disruption management for truck appointment system at a container terminal

    DEFF Research Database (Denmark)

    Li, N.; Chen, Gang; Jin, Z.

    2016-01-01

    -appointed arrivals at a container terminal that is running an appointment system. Second, we propose some response strategies to cope with different levels of disruptions, and evaluate their resilience ability with two Key Performance Indicators (KPIs): total waiting time of on-time trucks and total idling emissions...... of all trucks, in order to balance the service quality to punctual arrivals and green performance of the whole system. Third, we conduct a sensitivity analysis using a discrete event simulation to understand the performance of the proposed strategies. Considering both KPIs, the best strategy in most......-crane moving distance, especially when the first KPI is given lower weight than the second one....

  4. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  5. Graduates from dual qualification courses, registered nurse and health visitor: a career history study.

    Science.gov (United States)

    Drennan, Vari M; Porter, Elizabeth M J; Grant, Robert L

    2013-08-01

    Educationalists and managers internationally are challenged to find ways of preparing, recruiting early in their careers, and retaining nurses into public health roles in primary care. Public health nursing qualifications are post-initial nurse registration in the United Kingdom as in some other countries. In the mid twentieth century there were a number of innovative programmes of dual qualification: registered nurse and health visitor (the United Kingdom term for public health nurse). To investigate the career histories of graduates from courses integrating both nursing and health visitor qualifications. An observational, survey study. The United Kingdom. A purposive sample of graduates from integrated registered nurse and health visitor programmes, 1959-1995, from one University. Self completed, anonymous, survey sent to graduates, with contact details known to the University and through snowballing techniques, in 2011. Forty five women (56%), graduates in all four decades, returned the survey. A significant majority (82%) had taken up health visitor posts on completing the course. Over their careers, 42% of all jobs held were as health visitors. Only four never worked in a post that required a health visiting qualification. Most had undertaken paid work throughout their careers that focused on aspects of public health, often linked to child, maternal and/or family wellbeing. Many held teaching/lecturing and management posts at some point in their career. Those holding management posts were more likely to report leaving them as a result of organisational re-structuring or redundancy than those in non-management posts. Courses that prepare students to be both nurses and health visitors result in a majority of graduates who take up posts as health visitors on qualification and subsequently. Nurse education planners may find this evidence of value in determining ways of providing a future workforce for public health nursing. Copyright © 2012 Elsevier Ltd. All

  6. T25 Qualification of old containers

    International Nuclear Information System (INIS)

    Hoerning, T.; Kasparek, E.M.; Voelzke, H.

    2013-01-01

    Radioactive waste for final disposal in the repository Konrad has to be packaged in licensed containers. The qualification of containers is performed according the respective standards and BfS requirements. The latter ones differ for different container types with respect to accident resistance based on the release behavior of the waste. Usually qualification of container types is performed before series production. The qualification of already produced containers (''old containers'') is significantly more complicated. The differences of quality assurance and materials properties of the older containers have to be evaluated. A main tool for this evaluation is the numerical re-calculation of accident scenarios for estimation of the safety margins. The validation of appropriate finite element models is available. Based on these date it might be possible to abandon additional drop tests with the existing old containers to prove the structural integrity.

  7. Inspection procedure and essential parameters in NDT qualification

    International Nuclear Information System (INIS)

    Sarkimo, M.

    2000-06-01

    The objective of the inspection qualification is to ensure that applied non-destructive methods (NDT) have the required performance. The approach of the qualification process is systematic and carefully documented and therefore some new requirements can be seen concerning the composition of the documentation. There are also new document types, that only application of the inspection qualification requires. The most important of these is the technical justification, that includes the documented evidences concerning the performance of the inspection system. This publication includes two reports: 'Compilation of the inspection procedure' and 'Essential/influential parameters in NDT qualification'. The former of these discusses the issues to be considered in an inspection procedure especially from the point of view of the mechanised ultrasonic testing. The later report explains the parameters formulated to analyse in the technical justification all aspects of the inspection application. (orig.)

  8. 76 FR 38348 - Notice of Appointment of Committee Members to the Advisory Committee on Biotechnology and 21st...

    Science.gov (United States)

    2011-06-30

    ... Service Notice of Appointment of Committee Members to the Advisory Committee on Biotechnology and 21st.... ACTION: Notice of Appointment of Committee Members to the Advisory Committee on Biotechnology and 21st... the appointment of members to the Advisory Committee on Biotechnology and 21st Century Agriculture...

  9. Similarity principles for seismic qualification of equipment by experience data

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1989-01-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data is that available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application and verification of the procedures are given for actual test data available from previous qualifications. The developments are intended to elaborate on the rather broad guidelines by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. The results also contribute to filling a gap that exists between the IEEE 344 methodology and that which was previously developed for equipment in existing plants by the Seismic Qualification Utilities Group. 10 refs., 9 figs., 1 tab

  10. An investigation into why patients do not attend for out-patient radiology appointments

    International Nuclear Information System (INIS)

    Lyon, Rebecca; Reeves, Pauline J.

    2006-01-01

    Introduction: Patients who do not attend (DNA) for out-patient hospital appointments cause delays in the diagnosis and subsequent treatment of their own, and other patient's, illnesses, with potentially hazardous consequences. This also impacts upon waiting lists. Failure to attend is viewed as a specific type of non-compliance and social cognition theories have been applied to previous studies in an attempt to uncover the reasons why patients choose not to keep their appointments. Methods: A case-control study was conducted throughout the X-ray departments of a District General type of NHS Trust, using telephone interview questionnaires based on the Health Belief Model, in an attempt to identify any significant differences between attenders and non-attenders, so that likely non-attenders could be targeted. Results: Principal reasons for non-attendance were that the patient forgot or that they did not receive their appointment. The results differed from previous research, in that specific health beliefs were not the primary reasons for non-attendance. Departments that gave patients the opportunity to arrange their appointments for a mutually convenient time had exceptionally low DNA rates, as did those which had rigorous confirmation systems in place

  11. Fit for Purpose? Western Australian Insights into the Efficacy of Principal Preparation

    Science.gov (United States)

    Clarke, Simon; Wildy, Helen; Styles, Irene

    2011-01-01

    Purpose: This paper aims to highlight what principals consider their most severe challenges in the first three years of appointment and the extent to which they believe they were adequately prepared to meet these challenges. Design/methodology/approach: The paper reports on the initial Western Australian findings of a survey developed for Phase…

  12. Men’s Educational Group Appointments in Rural Nicaragua

    Science.gov (United States)

    Campbell, Bruce B.; Gonzalez, Hugo; Campbell, McKenzie; Campbell, Kent

    2016-01-01

    Men’s preventive health and wellness is largely neglected in rural Nicaragua, where a machismo culture prevents men from seeking health care. To address this issue, a men’s educational group appointment model was initiated at a rural health post to increase awareness about hypertension, and to train community health leaders to measure blood pressure. Men’s hypertension workshops were conducted with patient knowledge pretesting, didactic teaching, and posttesting. Pretesting and posttesting performances were recorded, blood pressures were screened, and community leaders were trained to perform sphygmomanometry. An increase in hypertension-related knowledge was observed after every workshop and community health leaders demonstrated proficiency in sphygmomanometry. In addition, several at-risk patients were identified and follow-up care arranged. Men’s educational group appointments, shown to be effective in the United States in increasing patient knowledge and satisfaction, appear to function similarly in a resource-constrained environment and may be an effective mechanism for reaching underserved men in Nicaragua. PMID:27885146

  13. Council appoints CERN’s next Director General

    CERN Multimedia

    Maximilien Brice

    2007-01-01

    On 14 December 2007, CERN Council appointed Professor Rolf-Dieter Heuer to succeed Dr Robert Aymar as CERN Director General. Professor Heuer will serve a five-year term, taking office on 1 January 2009. From Left to right: Dr Robert Aymar, current CERN Director General, Professor Torsten Åkesson, President of CERN Council, and Professor Rolf-Dieter Heuer, CERN's next Director General.

  14. determinant of psychophysiological state of sportsmen of high qualification with different emotional characteristics

    OpenAIRE

    Korobeynikova L.G.

    2011-01-01

    The purpose of the work - to study the determinants of psycho-physiological state of sportsmen of high qualification with different emotional characteristics. In experiment took part 19 highly skilled athletes involved in the Greco-Roman wrestling. The survey was carried out using a hardware-software complex psychodiagnostic "Multipsihometr-05. Determined by the emotional background of athletes according to the method A. Rukavishnikova features of visual perception and perceptual speed.

  15. 77 FR 21109 - Senior Executive Service; Appointment of Members to the Performance Review Board

    Science.gov (United States)

    2012-04-09

    ... DEPARTMENT OF LABOR Office of the Secretary Senior Executive Service; Appointment of Members to the Performance Review Board Title 5 U.S.C. 4314(c)(4) provides that Notice of the Appointment of an individual to serve as a member of the Performance Review Board of the Senior Executive Service shall be...

  16. 78 FR 24749 - Health Information Technology Policy Committee Appointment

    Science.gov (United States)

    2013-04-26

    ... GOVERNMENT ACCOUNTABILITY OFFICE Health Information Technology Policy Committee Appointment AGENCY... Recovery and Reinvestment Act of 2009 (ARRA) established the Health Information Technology Policy Committee to make recommendations on the implementation of a nationwide health information technology...

  17. An analysis of the relationship between staff qualification and export readiness of pharmaceutical companies: the case of iran.

    Science.gov (United States)

    Mohammadzadeh, Mehdi

    2012-01-01

    Export and the readiness to export constitute the first step of international marketing, which are affected by both internal and external factors of firms. One of the most important internal factors is the presence of skilled personnel. The purpose of this study was to define the relationship between staff qualification and encouragment with the readiness level of Iranian pharmacuetical firms for engagement in export marketing. The research was based on a single case study on a basket of seven leading domestic firms. For the bias reduction, questionnaires as well as interviews with managers were used. The performance of the studied factor was lower than the desired level for export readiness and there was much scope for improvement in staff qualifications to achieve such readiness. The results of this research enable small and medium-sized pharmaceutical companies to evaluate their staff qualification levels needed for export readiness and to detect their shortcomings in order to improve them.

  18. 49 CFR 391.11 - General qualifications of drivers.

    Science.gov (United States)

    2010-10-01

    ... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Qualification and... motor vehicle unless he/she is qualified to drive a commercial motor vehicle. Except as provided in...

  19. 29 CFR 1926.1076 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  20. Lead Time to Appointment and No-Show Rates for New and Follow-up Patients in an Ambulatory Clinic.

    Science.gov (United States)

    Drewek, Rupali; Mirea, Lucia; Adelson, P David

    High rates of no-shows in outpatient clinics are problematic for revenue and for quality of patient care. Longer lead time to appointment has variably been implicated as a risk factor for no-shows, but the evidence within pediatric clinics is inconclusive. The goal of this study was to estimate no-show rates and test for association between appointment lead time and no-show rates for new and follow-up patients. Analyses included 534 new and 1920 follow-up patients from pulmonology and gastroenterology clinics at a freestanding children's hospital. The overall rate of no-shows was lower for visits scheduled within 0 to 30 days compared with 30 days or more (23% compared with 47%, P < .0001). Patient type significantly modified the association of appointment lead time; the rate of no-shows was higher (30%) among new patients compared with (21%) follow-up patients with appointments scheduled within 30 days (P = .004). For appointments scheduled 30 or more days' lead time, no-show rates were statistically similar for new patients (46%) and follow-up patients (0.48%). Time to appointment is a risk factor associated with no-shows, and further study is needed to identify and implement effective approaches to reduce appointment lead time, especially for new patients in pediatric subspecialties.

  1. Review of qualifications for fuel assembly fabrication

    International Nuclear Information System (INIS)

    Slabu, Dan; Zemek, Martin; Hellwig, Christian

    2013-01-01

    The required quality of nuclear fuel in industrial production can only be assured by applying processes in fabrication and inspection, which are well mastered and have been proven by an appropriate qualification. The present contribution shows the understanding and experiences of Axpo with respect to qualifications in the frame of nuclear fuel manufacturing and reflects some related expectations of the operator. (orig.)

  2. Qualification tests for PWR control element drive mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new.

  3. Qualification tests for PWR control element drive mechanism

    International Nuclear Information System (INIS)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new

  4. Re-qualification of switchgear equipment following field modification

    International Nuclear Information System (INIS)

    Tulk, J.D.; El Bestawi, M.A.

    1984-01-01

    A set of 4.16 kV switchgear was seismically qualified by shaker table test for use in a nuclear power plant. Later, the equipment was modified by the addition of two extra switches and enclosures. This paper describes the methods used to extend the qualification achieved in the original proof test to the new configuration. Qualification of the modified switchgear depended on demonstrating that the intensity of the shaking that would be experienced by equipment mounted in the extended enclosure during a design basis earthquake (DBE) would be no stronger than the shaking that occurred during the original qualification testing. This was accomplished by a combination of analysis and experiment. Natural frequencies and mode-shapes of the original and extended enclosure structures were determined through in-situ modal tests on the equipment. Mathematical models based on the experimental results were then used for dynamic analyses which generated two sets of in-equipment response spectra: one set representing the original qualification test; and one set representing the response of the modified equipment to a hypothetical DBE. Qualification was confirmed by demonstrating that the test-based response spectra for the original configuration exceeded the response spectra developed for the extended structure subjected to DBE level excitation

  5. Guide to good practices for training and qualification of instructors. DOE handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this guide is to provide contractor training organizations with information that can be used to verify the adquacy and/or modify existing instructor training programs, or to develop new training programs. It contains good practices for the training and qualification of technical instructors and instructional technologists at DOE reactor and non-reactor nuclear facilities. It addresses the content of initial and continuing instructor training programs, evaluation of instructor training programs, and maintenance of instructor training records.

  6. Open-Source RTOS Space Qualification: An RTEMS Case Study

    Science.gov (United States)

    Zemerick, Scott

    2017-01-01

    NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

  7. 14 CFR 135.247 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Flight Crewmember Requirements § 135.247 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as pilot in command of an aircraft carrying...

  8. 49 CFR 214.343 - Training and qualification, general.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification, general. 214.343... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.343 Training and qualification, general. (a) No employer shall assign an employee to perform the duties of a...

  9. 27 CFR 19.823 - Changes after original qualification.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Changes after original... Vaporizing Process Qualification Documents § 19.823 Changes after original qualification. When there is a change in the information recorded in the original approved application, the proprietor shall make a...

  10. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  11. Buried Waste Program (BWP) data qualification manual

    International Nuclear Information System (INIS)

    Casey, C.; Larson, R.A.; Harris, G.A.

    1989-06-01

    The Data Qualification Manual (DQM) has been developed to discuss the process required to qualify data generated for the Buried Waste Program (BWP). The data from the BWP tasks conducted at the Radioactive Waste Management Complex (RWMC) and elsewhere will lead to remedial decisions being made which are governed by federal regulations administered by the Environmental Protection Agency (EPA). Data qualification is the process of insuring that only data of planned and known qualities are used to make a decision or answer a question. Although it is the Data Integrity Review Committee's (DIRC) responsibility to insure that the quality of all BWP data is ultimately verified and validated, all personnel who participate in the data gathering process will affect the quality of the data and must be responsible for knowing what is required to produce data of the planned quality. Therefore this manual is addressed to all participants in a data-gathering task. This manual discusses requirements to support data qualification in several areas, including: the sampling and analysis plan; data quality objectives and PARCC goals; sample custody documentation; quality assurance; assembly of the data qualification package; and existing data. 23 refs., 4 figs., 6 tabs

  12. AGR-1 Data Qualification Report

    International Nuclear Information System (INIS)

    Abbott, Michael

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office (TDO) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor experiment (AGR-1), the processing of these data within NDMAS, and reports the qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. They include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent quality assurance program. The NDMAS database processing and qualification status of the following five data streams is reported in this document: (1) Fuel fabrication data. All data have been processed into the NDMAS database and qualified (1,819 records). (2) Fuel irradiation data. Data from all 13 AGR-1 reactor cycles have been processed into the NDMAS database and tested. Of these, 85% have been qualified and 15% have failed NDMAS accuracy testing. (3) FPMS data. Reprocessed (January 2010) data from all 13 AGR-1 reactor cycles have been processed into the database and capture tested. Final qualification of these data will be recorded after QA approval of an Engineering Calculations and Analysis Report currently

  13. 22 CFR 11.30 - Senior Foreign Service officer career candidate and limited non-career appointments.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Senior Foreign Service officer career candidate... PERSONNEL APPOINTMENT OF FOREIGN SERVICE OFFICERS § 11.30 Senior Foreign Service officer career candidate and limited non-career appointments. (a) General considerations. (1) Career officers at the Senior...

  14. 14 CFR 121.437 - Pilot qualification: Certificates required.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Certificates required... Pilot qualification: Certificates required. (a) No pilot may act as pilot in command of an aircraft (or... pilots) unless he holds an airline transport pilot certificate and an appropriate type rating for that...

  15. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as a required pilot flight crewmember unless within the preceding 90...

  16. Qualification Users' Perceptions and Experiences of Assessment Reliability

    Science.gov (United States)

    Chamberlain, Suzanne

    2013-01-01

    This paper presents the findings of a study designed to explore qualification users' perceptions and experiences of reliability in the context of national assessment outcomes in England. The study consisted of 17 focus groups conducted across six sectors of qualification users: students, teachers, trainee teachers, job-seekers, employers and…

  17. Revision of the qualification framework at the Technical University of Denmark Part 2

    DEFF Research Database (Denmark)

    Henneberg, Kaj-Åge; Kuhn, Luise Theil; Jungersen, Gregers

    2017-01-01

    Using a revised Qualification Framework (QF) with four main categories: -to know, - to be, -to interact, and -to do, this paper demonstrates how to use the elements of the QF to construct Programme-Qualification Matrices. A general Programme- Qualification Matrix defines the qualifications and th...

  18. Questions of qualification exam for non-destructive testing and materials science - the first level

    International Nuclear Information System (INIS)

    Shaaban, H.I.; Addarwish, J.M.A.

    2013-01-01

    The book contains seven chapters: Questions of qualification for magnetic particles testing method - Questions of qualification for liquids penetrant testing method - Questions of qualification for the visual inspection testing method - Questions of qualification for the ultrasonic testing method - Questions of qualification for the eddy current testing method - Questions of rehabilitation for industrial radiographic testing method - Qualification questions about materials science and manufacturing defects of castings and welding and comparison between non-destructive testing methods.

  19. Seismic qualification of existing nuclear installations in India - a proposal

    International Nuclear Information System (INIS)

    Basu, P.C.

    2001-01-01

    In India, the work toward seismic qualification of existing nuclear facilities has been started. Preliminary work is being undertaken with respect to identifying the facilities which would be taken up for seismic qualification, approach and methodology for re-evaluation for seismic safety, acceptance criteria, etc. Work has also been started for framing up the criteria and methodology of the seismic qualification of these facilities. Present paper contains the proposal in this respect. This proposal is on similar lines of the present practice of seismic qualification of NPP, as summarized in the Appendix, but has been modified to suit the special requirements of Indian nuclear installations. (author)

  20. determinant of psychophysiological state of sportsmen of high qualification with different emotional characteristics

    Directory of Open Access Journals (Sweden)

    Korobeynikova L.G.

    2011-04-01

    Full Text Available The purpose of the work - to study the determinants of psycho-physiological state of sportsmen of high qualification with different emotional characteristics. In experiment took part 19 highly skilled athletes involved in the Greco-Roman wrestling. The survey was carried out using a hardware-software complex psychodiagnostic "Multipsihometr-05. Determined by the emotional background of athletes according to the method A. Rukavishnikova features of visual perception and perceptual speed.

  1. Non-English speakers attend gastroenterology clinic appointments at higher rates than English speakers in a vulnerable patient population

    Science.gov (United States)

    Sewell, Justin L.; Kushel, Margot B.; Inadomi, John M.; Yee, Hal F.

    2009-01-01

    Goals We sought to identify factors associated with gastroenterology clinic attendance in an urban safety net healthcare system. Background Missed clinic appointments reduce the efficiency and availability of healthcare, but subspecialty clinic attendance among patients with established healthcare access has not been studied. Study We performed an observational study using secondary data from administrative sources to study patients referred to, and scheduled for an appointment in, the adult gastroenterology clinic serving the safety net healthcare system of San Francisco, California. Our dependent variable was whether subjects attended or missed a scheduled appointment. Analysis included multivariable logistic regression and classification tree analysis. 1,833 patients were referred and scheduled for an appointment between 05/2005 and 08/2006. Prisoners were excluded. All patients had a primary care provider. Results 683 patients (37.3%) missed their appointment; 1,150 (62.7%) attended. Language was highly associated with attendance in the logistic regression; non-English speakers were less likely than English speakers to miss an appointment (adjusted odds ratio 0.42 [0.28,0.63] for Spanish, 0.56 [0.38,0.82] for Asian language, p gastroenterology clinic appointment, not speaking English was most strongly associated with higher attendance rates. Patient related factors associated with not speaking English likely influence subspecialty clinic attendance rates, and these factors may differ from those affecting general healthcare access. PMID:19169147

  2. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Recent experience. 121... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person serve as a required pilot flight crewmember, unless within the preceding 90 days, that person has made...

  3. 32 CFR 935.139 - Motor vehicle operator qualifications.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor vehicle operator qualifications. 935.139... AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.139 Motor vehicle operator qualifications. (a) No person may operate a privately owned motor vehicle on Wake Island unless he has an island...

  4. Appointment keeping for medical review among patients with selected chronic diseases in an urban area of Uganda.

    Science.gov (United States)

    Kalyango, Joan Nakayaga; Hall, Maurice; Karamagi, Charles

    2014-01-01

    Proper management of chronic diseases is important for prevention of disease complications and yet some patients miss appointments for medical review thereby missing the opportunity for proper monitoring of their disease conditions. There is limited information on missed appointments among chronic disease patients in resource limited settings. This study aimed to determine the prevalence of missed appointments for medical review and associated factors among chronic disease patients in an urban area of Uganda. Patients or caregivers of children with chronic diseases were identified as they bought medicines from a community pharmacy. They were visited at home to access their medical documents and those whose chronic disease status was ascertained were enrolled. The data was collected using: questionnaires, review of medical documents, and in-depth interviews with chronic disease patients. The prevalence of missed appointments was 42% (95%CI = 35-49%). The factors associated with missed appointments were: monthly income ≤30US Dollars (OR = 2.56, CI = 1.25-5.26), affording less than half of prescribed drugs (OR = 3.92, CI = 1.64-9.40), not experiencing adverse events (OR = 2.66, CI = 1.26-5.61), not sure if treatment helps (OR = 2.84, CI = 1.047.77), not having a medicines administration schedule (OR = 6.77, CI = 2.11-21.68), and increasing number of drugs (OR = 0.72, CI = 0.53-0.98). Patients missed appointments mainly due to: financial and health system barriers, conflicting commitments with appointments, and perceptions of the disease condition. Patients should be supported with accessible and affordable health services.

  5. Global Trend In The Qualifications Of Medical Educators | Issa ...

    African Journals Online (AJOL)

    NPMCN) or its equivalents is the highest educational and professional qualification of clinical Medical Educators in Nigeria while PhD is the acceptable highest qualification for their basic medical sciences counterparts. This had been the status ...

  6. 42 CFR 24.5 - Peer review.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Peer review. 24.5 Section 24.5 Public Health PUBLIC....5 Peer review. An individual may not be considered for appointment into the SBRS unless his/her qualifications have been reviewed by a PHS peer review committee and the committee has recommended appointment to...

  7. The unilateral appointment of co-arbitrators

    DEFF Research Database (Denmark)

    Tufte-Kristensen, Johan

    2016-01-01

    on some important aspects of the procedure but leaves certain aspects and arguments unconsidered. The article approaches the appointment procedure from a neutral position. It identifies and considers the relevant rules, practices, and arguments in order to discuss the procedure’s implications...... of experienced arbitration practitioners have advocated against the procedure for some of the reasons above, whereas other experienced arbitration practitioners have defended the procedure because of its practical advantages and underlying rationales. Each of the previous contributions to the debate sheds light...

  8. Assessing mathematics within advanced school science qualifications

    OpenAIRE

    McAlinden, Mary; Noyes, Andrew

    2017-01-01

    Following sustained discussion regarding the relationship between advanced mathematics and science learning in England, the government has pursued a reform agenda in which mathematics is embedded in national, high stakes A-level science qualifications and their assessments for 18-year-olds. For example, A-level Chemistry must incorporate the assessment of relevant mathematics for at least 20% of the qualification. Other sciences have different mandated percentages. This embedding policy is ru...

  9. Data Qualification Report: Calculated Porosity and Porosity-Derived Values for Lithostratigraphic Units for use on the Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    P. Sanchez

    2001-05-30

    The qualification is being completed in accordance with the Data Qualification Plan DQP-NBS-GS-000006, Rev. 00 (CRWMS M&O 2001). The purpose of this data qualification activity is to evaluate for qualification the unqualified developed input and porosity output included in Data Tracking Number (DTN) M09910POROCALC.000. The main output of the analyses documented in DTN M09910POROCALC.000 is the calculated total porosity and effective porosity for 40 Yucca Mountain Project boreholes. The porosity data are used as input to Analysis Model Report (AMR) 10040, ''Rock Properties Model'' (MDL-NBS-GS-000004, Rev. 00), Interim Change Notice [ICN] 02 (CRWMS M&O 2000b). The output from the rock properties model is used as input to numerical physical-process modeling within the context of a relationship developed in the AMR between hydraulic conductivity, bound water and zeolitic zones for use in the unsaturated zone model. In accordance with procedure AP-3.15Q, the porosity output is not used in the direct calculation of Principal Factors for post-closure safety or disruptive events. The original source for DTN M09910POROCALC.000 is a Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M&O) report, ''Combined Porosity from Geophysical Logs'' (CRWMS M&O 1999a and hereafter referred to as Rael 1999). That report recalculated porosity results for both the historical boreholes covered in Nelson (1996), and the modern boreholes reported in CRWMS M&O (1996a,b). The porosity computations in Rael (1999) are based on density-porosity mathematical relationships requiring various input parameters, including bulk density, matrix density and air and/or fluid density and volumetric water content. The main output is computed total porosity and effective porosity reported on a foot-by-foot basis for each borehole, although volumetric water content is derived from neutron data as an interim output. This qualification

  10. Data Qualification Report: Calculated Porosity and Porosity-Derived Values for Lithostratigraphic Units for use on the Yucca Mountain Project

    International Nuclear Information System (INIS)

    P. Sanchez

    2001-01-01

    The qualification is being completed in accordance with the Data Qualification Plan DQP-NBS-GS-000006, Rev. 00 (CRWMS M and O 2001). The purpose of this data qualification activity is to evaluate for qualification the unqualified developed input and porosity output included in Data Tracking Number (DTN) M09910POROCALC.000. The main output of the analyses documented in DTN M09910POROCALC.000 is the calculated total porosity and effective porosity for 40 Yucca Mountain Project boreholes. The porosity data are used as input to Analysis Model Report (AMR) 10040, ''Rock Properties Model'' (MDL-NBS-GS-000004, Rev. 00), Interim Change Notice [ICN] 02 (CRWMS M and O 2000b). The output from the rock properties model is used as input to numerical physical-process modeling within the context of a relationship developed in the AMR between hydraulic conductivity, bound water and zeolitic zones for use in the unsaturated zone model. In accordance with procedure AP-3.15Q, the porosity output is not used in the direct calculation of Principal Factors for post-closure safety or disruptive events. The original source for DTN M09910POROCALC.000 is a Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) report, ''Combined Porosity from Geophysical Logs'' (CRWMS M and O 1999a and hereafter referred to as Rael 1999). That report recalculated porosity results for both the historical boreholes covered in Nelson (1996), and the modern boreholes reported in CRWMS M and O (1996a,b). The porosity computations in Rael (1999) are based on density-porosity mathematical relationships requiring various input parameters, including bulk density, matrix density and air and/or fluid density and volumetric water content. The main output is computed total porosity and effective porosity reported on a foot-by-foot basis for each borehole, although volumetric water content is derived from neutron data as an interim output. This qualification report uses

  11. Use of Six Sigma Methodology to Reduce Appointment Lead-Time in Obstetrics Outpatient Department.

    Science.gov (United States)

    Ortiz Barrios, Miguel A; Felizzola Jiménez, Heriberto

    2016-10-01

    This paper focuses on the issue of longer appointment lead-time in the obstetrics outpatient department of a maternal-child hospital in Colombia. Because of extended appointment lead-time, women with high-risk pregnancy could develop severe complications in their health status and put their babies at risk. This problem was detected through a project selection process explained in this article and to solve it, Six Sigma methodology has been used. First, the process was defined through a SIPOC diagram to identify its input and output variables. Second, six sigma performance indicators were calculated to establish the process baseline. Then, a fishbone diagram was used to determine the possible causes of the problem. These causes were validated with the aid of correlation analysis and other statistical tools. Later, improvement strategies were designed to reduce appointment lead-time in this department. Project results evidenced that average appointment lead-time reduced from 6,89 days to 4,08 days and the deviation standard dropped from 1,57 days to 1,24 days. In this way, the hospital will serve pregnant women faster, which represents a risk reduction of perinatal and maternal mortality.

  12. Philip II’s Quest. The Appointment of Governors-General during the Dutch Revolt (1559-1598

    Directory of Open Access Journals (Sweden)

    V. Soen

    2011-01-01

    Full Text Available Philip II’s Quest: The Appointment of Governors-General during the Dutch Revolt (1559-1598Recent historiographical studies have presented the Habsburg appointment of governors-general during the Dutch Revolt as the outcome of factional infighting at the Spanish Court. While this so-called ‘faction model’ has yielded new insights, it also raises a number of problems. Firstly, in the new model, the role of the dynasty is unduly relegated to the background – even though Philip II’s appointment decisions were mainly driven by dynastic considerations. Secondly, the power struggle at the Spanish Court was not only a conflict between court factions, but also between noble houses vying for prestige and trying to secure positions for their offspring. Thirdly, there is an excessive focus on the Spanish Court, while the feuds between noble houses in the Low Countries also played a role in the interim appointments made during the Revolt. Finally, Philip II always looked for the most suitable candidate in terms of administration and warfare during the Dutch Revolt, in accordance with the constraints of the composite Spanish monarchy. Only the combination of these four (frequently contradictory motives reveals how Philip II’s appointment of governors can be seen as a quest for the right man or woman in the right place.

  13. Location based mobile app for doctor's appointment inSaudi Arabia ...

    African Journals Online (AJOL)

    Journal of Fundamental and Applied Sciences ... Reducing waiting times and surgeon idle time improves the quality of service and efficiency ... to develop an appointment management application for mobile devices using the Android platform.

  14. Biomarker Qualification: Toward a Multiple Stakeholder Framework for Biomarker Development, Regulatory Acceptance, and Utilization.

    Science.gov (United States)

    Amur, S; LaVange, L; Zineh, I; Buckman-Garner, S; Woodcock, J

    2015-07-01

    The discovery, development, and use of biomarkers for a variety of drug development purposes are areas of tremendous interest and need. Biomarkers can become accepted for use through submission of biomarker data during the drug approval process. Another emerging pathway for acceptance of biomarkers is via the biomarker qualification program developed by the Center for Drug Evaluation and Research (CDER, US Food and Drug Administration). Evidentiary standards are needed to develop and evaluate various types of biomarkers for their intended use and multiple stakeholders, including academia, industry, government, and consortia must work together to help develop this evidence. The article describes various types of biomarkers that can be useful in drug development and evidentiary considerations that are important for qualification. A path forward for coordinating efforts to identify and explore needed biomarkers is proposed for consideration. © 2015 American Society for Clinical Pharmacology and Therapeutics.

  15. 29 CFR 1910.410 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Qualifications of dive team. 1910.410 Section 1910.410... Requirements § 1910.410 Qualifications of dive team. (a) General. (1) Each dive team member shall have the experience or training necessary to perform assigned tasks in a safe and healthful manner. (2) Each dive team...

  16. Impact of health portal enrollment with email reminders on adherence to clinic appointments: a pilot study.

    Science.gov (United States)

    Horvath, Monica; Levy, Janet; L'Engle, Pete; Carlson, Boyd; Ahmad, Asif; Ferranti, Jeffrey

    2011-05-26

    Internet portal technologies that provide access to portions of electronic health records have the potential to revolutionize patients' involvement in their care. However, relatively few descriptions of the demographic characteristics of portal enrollees or of the effects of portal technology on quality outcomes exist. This study examined data from patients who attended one of seven Duke Medicine clinics and who were offered the option of enrolling in and using the Duke Medicine HealthView portal (HVP). The HVP allows patients to manage details of their appointment scheduling and provides automated email appointment reminders in addition to the telephone and mail reminders that all patients receive. Our objective was to test whether portal enrollment with an email reminder functionality is significantly related to decreases in rates of appointment "no-shows," which are known to impair clinic operational efficiency. Appointment activity during a 1-year period was examined for all patients attending one of seven Duke Medicine clinics. Patients were categorized as portal enrollees or as nonusers either by their status at time of appointment or at the end of the 1-year period. Demographic characteristics and no-show rates among these groups were compared. A binomial logistic regression model was constructed to measure the adjusted impact of HVP enrollment on no-show rates, given confounding factors. To demonstrate the effect of HVP use over time, monthly no-show rates were calculated for patient appointment keeping and contrasted between preportal and postportal deployment periods. Across seven clinics, 58,942 patients, 15.7% (9239/58,942) of whom were portal enrollees, scheduled 198,199 appointments with an overall no-show rate of 9.9% (19,668/198,199). We found that HVP enrollees were significantly more likely to be female, white, and privately insured compared with nonusers. Bivariate no-show rate differences between portal enrollment groups varied widely according

  17. AGR-2 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Michael L.

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  18. AGR-2 Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Michael L. Abbott

    2010-09-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  19. The UK system of recognising qualified experts

    International Nuclear Information System (INIS)

    Bines, W.

    2002-01-01

    EURATOM Basic Safety Standards (BSS) Directives have long included requirements for the involvement of qualified experts, the definition of which has scarcely changed since at least 1976. The Directive requirement, in the definition of qualified expert,, for competent authorities to recognise the capacity to act as a qualified expert has been interpreted by Member States in widely differing ways, ranging from the minimalist or case by case to the highly detailed and prescriptive. In the United Kingdom (UK), the qualified expert for occupational radiation protection is the radiation protection adviser and the competent authority is the Health and Safety Executive (HSE). The Ionising Radiations Regulations 1985, which largely implemented the 1980 BSS Directive, required an employer to appoint one or more radiation protection advisers for the purpose of advising him as to the observance of these Regulations and other health and safety matters in connection with ionising radiation. The Regulations addressed the question of recognition by forbidding an employer to appoint a person as a radiation protection adviser unless: that person was suitably qualified and experienced; the employer had notified the Health and Safety Executive in writing of the intended appointment at least 28 days in advance, giving the name of the person and particulars of his qualifications and experience and the scope of the advice he would be required to give; and the employer had received from HSE an acknowledgement in writing of the notification. This system allowed HSE to follow up and query any apparently unsuitable potential appointments while applying a light overall administrative touch. The Approved Code of Practice supporting the Regulations included advice on the qualifications, experience and qualities that the employer should look for in a suitable radiation protection adviser

  20. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    Energy Technology Data Exchange (ETDEWEB)

    Spaang, Kjell [Ingemansson Technology AB, Goeteborg (Sweden); Staahl, Gunnar [Westinghouse Atom, Vaesteraas (Sweden)

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components.

  1. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components

  2. Economies of using seismic experience data qualification methods at Department of Energy facilities

    International Nuclear Information System (INIS)

    Loceff, F.; Antaki, G.; Goen, L.

    1995-01-01

    This paper summarizes the implementation of the seismic qualification of existing equipment using experience data techniques. The emphasis is on the economies of this approach compared with standard qualification methods of analysis and testing or replacement with qualified equipment. Seismic qualification of existing equipment using experience data is a technical necessity and is the most economically attractive of the options. Representative costs for seismic qualification at two facilities show costs are substantially lower than the costs for qualification using conventional methods. Because of the experience to date, the authors recommend that the Department of Energy continue to sponsor the Existing Facilities Program for applying qualification using experience data techniques at DOE facilities

  3. Appointment reminder systems are effective but not optimal: results of a systematic review and evidence synthesis employing realist principles.

    Science.gov (United States)

    McLean, Sionnadh Mairi; Booth, Andrew; Gee, Melanie; Salway, Sarah; Cobb, Mark; Bhanbhro, Sadiq; Nancarrow, Susan A

    2016-01-01

    Missed appointments are an avoidable cost and resource inefficiency which impact upon the health of the patient and treatment outcomes. Health care services are increasingly utilizing reminder systems to manage these negative effects. This study explores the effectiveness of reminder systems for promoting attendance, cancellations, and rescheduling of appointments across all health care settings and for particular patient groups and the contextual factors which indicate that reminders are being employed sub-optimally. We used three inter-related reviews of quantitative and qualitative evidence. Firstly, using pre-existing models and theories, we developed a conceptual framework to inform our understanding of the contexts and mechanisms which influence reminder effectiveness. Secondly, we performed a review following Centre for Reviews and Dissemination guidelines to investigate the effectiveness of different methods of reminding patients to attend health service appointments. Finally, to supplement the effectiveness information, we completed a review informed by realist principles to identify factors likely to influence non-attendance behaviors and the effectiveness of reminders. We found consistent evidence that all types of reminder systems are effective at improving appointment attendance across a range of health care settings and patient populations. Reminder systems may also increase cancellation and rescheduling of unwanted appointments. "Reminder plus", which provides additional information beyond the reminder function may be more effective than simple reminders (ie, date, time, place) at reducing non-attendance at appointments in particular circumstances. We identified six areas of inefficiency which indicate that reminder systems are being used sub-optimally. Unless otherwise indicated, all patients should receive a reminder to facilitate attendance at their health care appointment. The choice of reminder system should be tailored to the individual service

  4. Qualifications of Subject Teachers in Special Education Schools

    Science.gov (United States)

    Rasmussen, Meryem Uçar; Kis, Arzu

    2018-01-01

    Teacher qualifications are essential to be able to teach children with special needs efficiently. Therefore the aim of this study is to determine the qualifications of subject teachers in special education schools in Turkey. In the study 20 subject teachers within the field of music, art and sports who worked in special education schools in Turkey…

  5. 14 CFR 121.909 - Approval of Advanced Qualification Program.

    Science.gov (United States)

    2010-01-01

    ... criteria. Each AQP must have separate curriculums for indoctrination, qualification, and continuing... the training and evaluation of CRM and technical skills and knowledge. An application for approval of... must meet all the requirements of this subpart. (2) Each indoctrination, qualification, and continuing...

  6. Endodontic inter-appointment flare-ups: An example of chaos?

    Directory of Open Access Journals (Sweden)

    Poorya Jalali

    2015-01-01

    Full Text Available Introduction: Pain and/or swelling after instrumentation of a root canal constitute a significant complication during endodontic treatment. Despite a large number of articles discussing the causative factors behind endodontic flare-ups, the exact mechanism is still not understood. The Hypothesis: The seemingly irrational behavior of endodontic inter-appointment flare-ups may be due to sensitive dependence on initial conditions. A model based on Lorenz′ chaos theory is presented as a possible explanation for the sudden emergence and unpredictability of flare-ups. Evaluation of the Hypothesis: All studies agree on some common traits regarding inter-appointment flare-ups: Careful instrumentation can still cause flare-up; the host inflammatory response behaves as a complex nonlinear network; and also the poly-etiologic nature of this phenomenon all illustrate the sensitive dependence on initial conditions of the system. Integrating more variables (e.g., different species of bacteria into this already complex system will make it increasingly chaotic reflecting its unpredictable behavior.

  7. 25 CFR 291.10 - What is the role of the mediator appointed by the Secretary?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the role of the mediator appointed by the... ENTERPRISES CLASS III GAMING PROCEDURES § 291.10 What is the role of the mediator appointed by the Secretary? (a) The mediator must ask the Indian tribe and the State to submit their last best proposal for Class...

  8. 78 FR 14071 - Notice of Appointment of Members to the National Agricultural Research, Extension, Education, and...

    Science.gov (United States)

    2013-03-04

    ...,'' Charles Boyer, Dean, Jordan College of Agriculture and Technology, California State University-Fresno... DEPARTMENT OF AGRICULTURE Office of the Secretary Notice of Appointment of Members to the National... Act, 5 U.S.C. App 2, the United States Department of Agriculture announces the appointments made by...

  9. Qualification of box HEPA filters for nuclear applications

    International Nuclear Information System (INIS)

    Bergman, W.; Larsen, G.; Wilson, K.; Rainer, F.

    1995-03-01

    We have successfully completed qualification tests on high efficiency particulate air (HEPA) filters that are encapsulated within a box and manufactured by American Air Filters. The qualification tests are required by the American Society of Mechanical Engineers Standard ASME N509 and the U.S. Military Standard MIL-F-51068 for HEPA filters to be used in nuclear applications. The qualification tests specify minimum filter efficiencies following exposure to heated air, overpressure, and rough handling. Prior to this study, no box HEPA filters from any manufacturer had been qualified despite their wide-spread use in Department of Energy (DOE) facilities. Box HEPA filters are not addressed in any of the existing HEPA standards and only briefly discussed in the Nuclear Air Cleaning Handbook

  10. Qualifications manual for Inspection and Enforcement personnel. Volume I. Detailed data sheets

    International Nuclear Information System (INIS)

    Bartley, H.J.; Heyer, F.H.K.; Schwartz, E.G.; Harrison, O.J.; Krass, I.W.; Welsh, D.M.

    1978-06-01

    This document is the General Research Corporation (GRC) final report on Task I Job/Position Qualifications Statements for the Headquarters and regional position of NRC/IE. It reflects the results of upgrading, expanding, and reformating the preliminary Task I report. To accomplish this, GRC made a thorough examination of all data developed during Task I, Task II (Career Fields), Task III (Training Evaluation), and Task IV (Hiring Qualifications), to include NRC/IE comments and management decisions received. The reformated Job/Position Qualifications Statements resulting from this effort (Appendix A) identify three job qualifications categories for each position--performance, attributes, and knowledge. Two formats are provided: a summarized one for manpower management in Volume I and a detailed one for career and training management in Volume II. In addition to recommending approval of the job/position qualifications, GRC proposes their use in conjunction with the hiring qualifications in the Task IV report to update NRC/IE job descriptions

  11. Experience on environmental qualification of safety-related components for Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Yu, A.S.; Kukreti, B.M.

    1987-01-01

    The proliferation of Nuclear Power Plant safety concerns has lead to increasing attention over the Environmental Qualification (EQ) of Nuclear Power Plant Safety-Related Components to provide the assurance that the safety related equipment will meet their intended functions during normal operation and postulated accident conditions. The environmental qualification of these components is also a Licensing requirement for Darlington Nuclear Generating Station. This paper provides an overview of EQ and the experience of a pilot project, in the qualification of the Main Moderator System safety-related functions for the Darlington Nuclear Generating Station currently under construction. It addresses the various phases of qualification from the identification of the EQ Safety-Related Components List, definition of location specific service conditions (normal, adbnormal and accident), safety-related functions, Environmental Qualification Assessments and finally, an EQ system summary report for the Main Moderator System. The results of the pilot project are discussed and the methodology reviewed. The paper concludes that the EQ Program developed for Darlington Nuclear Generating Station, as applied to the qualification of the Main Moderator System, contained all the elements necessary in the qualification of safety-related equipment. The approach taken in the qualification of the Moderator safety-related equipment proves to provide a sound framework for the qualification of other safety-related components in the station

  12. Qualifications Frameworks and Their Conflicting Social Imaginaries of Globalisation

    Science.gov (United States)

    Louise Sarauw, Laura

    2012-01-01

    Critics often see the European Bologna Process as a univocal standardisation of higher education. By exploring how different qualifications frameworks project different social imaginaries of globalisation, this article takes a different stance. The overarching qualifications framework of the Bologna Process rests on a socially constituted and…

  13. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  14. Why Patients Miss Follow-Up Appointments: A Prospective Control ...

    African Journals Online (AJOL)

    Reasons include: transport (19 responses), ill-health (6) and financial constraints (5). State transport was unavailable to almost twothirds of the responders who cited transport as a problem. Conclusions: The 17% missed appointment rate is largely due to transport constraints. The commonest time for patients to miss ...

  15. Qualification of electrical equipment. A United States nuclear system supplier perspective

    International Nuclear Information System (INIS)

    Jordan, W.G.

    1978-01-01

    At Westinghouse Pressurized Water Reactor Systems Division (PWR-SD) qualification. of safety related electrical equipment can be segregated into three distinct generations: (1) the initial seismic and environmental qualification programs for electrical equipment (1969-1972); (2) the supplemental sismic and environmental qualification programs (1975-1977); and (3) the seismic and environmental qualification programs to meet IEEE-323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations''(1975). The latter two programs (in a licensing framework), as they are most current, with emphasis on electrical equipment (e.g. transmitters, rack mounted equipment) as opposed to electro-mechanical equipment (valve operators, pump motors) are reviewed. (author)

  16. Council Appointed Mayors in Spain: Effects on Local Democracy

    Directory of Open Access Journals (Sweden)

    María Jesús García García

    2017-03-01

    Full Text Available This paper deals with the influence of having council appointed mayors on local governments. Five elements of local government systems are considered: the electoral system and its influence on the political composition of the local government; the local government structure and the distribution of functions and powers between mayor and council; the role of political parties; scrutiny of the executive and accountability; and citizen participation. This analysis highlights the effect that a council appointed mayor system has in terms of accountability and legitimacy, transparency and efficiency. KEYWORDS Local government systems, directly elected mayors, local governance, council appointed mayors, Local Government Structure; Political Parties; Citizen Participation; Accountability. El presente artículo toma en consideración los efectos que el sistema de elección del Alcalde tiene sobre la democracia local, basándose en la consideración cinco aspectos: el sistema electoral y su influencia en la composición política de las administraciones locales; la estructura de la administración local y la distribución de funciones entre los alcaldes y el pleno municipal; el papel de los partidos políticos; los mecanismos de control del ejecutivo local y la participación ciudadana. El estudio subraya especialmente la incidencia que el sistema de elección del alcalde por los concejales tiene en relación con los principios de responsabilidad, legitimidad, transparencia y eficiencia de la gestión local. PALABRAS CLAVE Gobierno local, elección directa de los alcaldes, elección indirecta de los alcaldes, estructura del gobierno local, partidos políticos, participación ciudadana, responsabilidad política.

  17. Improving access to health care in a rural regional hospital in South Africa: Why do patients miss their appointments?

    Science.gov (United States)

    Frost, Lucy; Jenkins, Louis S; Emmink, Benjamin

    2017-03-30

    Access to health services is one of the Batho Pele ('people first') values and principles of the South African government since 1997. This necessitated some changes around public service systems, procedures, attitudes and behaviour. The challenges of providing health care to rural geographically spread populations include variations in socio-economic status, transport opportunities, access to appointment information and patient perceptions of costs and benefits of seeking health care. George hospital, situated in a rural area, serves 5000 outpatient visits monthly, with non-attendance rates of up to 40%. The aim of this research was to gain a greater understanding of the reasons behind non-attendance of outpatient department clinics to allow locally driven, targeted interventions. This was a descriptive study. We attempted to phone all patients who missed appointments over a 1-month period (n = 574). Only 20% were contactable with one person declining consent. Twenty-nine percent had no telephone number on hospital systems, 7% had incorrect numbers, 2% had died and 42% did not respond to three attempts. The main reasons for non-attendance included unaware of appointment date (16%), out of area (11%), confusion over date (11%), sick or admitted to hospital (10%), family member sick or died (7%), appointment should have been cancelled by clerical staff (6%) and transport (6%). Only 9% chose to miss their appointment. The other 24% had various reasons. Improved patient awareness of appointments, adjustments in referral systems and enabling appointment cancellation if indicated would directly improve over two-thirds of reasons for non-attendance. Understanding the underlying causes will help appointment planning, reduce wasted costs and have a significant impact on patient care.

  18. 5 CFR 315.603 - Appointment based on former incumbency of a position brought into the competitive service.

    Science.gov (United States)

    2010-01-01

    ... OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CAREER AND CAREER-CONDITIONAL EMPLOYMENT Career or Career-Conditional Appointment Under Special Authorities § 315.603 Appointment based on former... type of case from this requirement. (b) Review of disapproved recommendations. Agencies shall establish...

  19. ENIQ: European Network for Inspection Qualification: Status report

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Crutzen, S.; Lemaitre, P.

    1998-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In this paper the main activities, organisation and actual status of ENIQ are discussed. (author)

  20. European methodology for qualification of NDT as developed by ENIQ

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Engl, G.; Crutzen, S.; Lemaitre, P.

    1997-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In the framework of ENIQ the European methodology for qualification of NDT has been developed. In this paper the main principles of the European methodology are given besides the main activities and organisation of ENIQ. (orig.)

  1. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  2. PROJECT, MANUFACTURING AND QUALIFICATION OF MACHINE TO ROTARY BENDING OF NITI SUPERELASTIC WIRES IN FATIGUE TESTS

    Directory of Open Access Journals (Sweden)

    William Marcos Muniz Menezes

    2014-03-01

    Full Text Available In this work it was developed a rotating bending apparatus for fatigue tests of superelastic NiTi wires, and other materials with high elasticity. It was evaluated the performance, robustness, operability, and reliability through testing of 1 mm thick stainless steel wires. This device is mounted on a steel frame and features semiautomatic rotation speed control, time and testing bath temperature for sample immersion. The equipment qualification tests were performed controlling the following parameters: deformation of the wire, power level and ambient temperature. The results indicated lower discrepancies for the following parameters evaluated: number of cycles in fatigue life, rotation speed, the bath temperature and arc angle of rupture. Besides the reliability, the robustness and operability of the equipment also meet the purpose of the research as evidenced by the small number of failures in the qualification tests and calibration.

  3. Lower-Level Qualifications as a Stepping Stone for Young People. Occasional Paper

    Science.gov (United States)

    Oliver, Damian

    2012-01-01

    Lower-level qualifications (certificate I and II programs) provide little or no immediate return to the individual in terms of increased wages. However, lower-level qualifications are intended to prepare students who would otherwise not be capable of enrolling in and completing a higher-level qualification or making a successful transition into…

  4. Joint Optimization of Preventive Maintenance and Spare Parts Inventory with Appointment Policy

    Directory of Open Access Journals (Sweden)

    Jing Cai

    2017-01-01

    Full Text Available Under the background of the wide application of condition-based maintenance (CBM in maintenance practice, the joint optimization of maintenance and spare parts inventory is becoming a hot research to take full advantage of CBM and reduce the operational cost. In order to avoid both the high inventory level and the shortage of spare parts, an appointment policy of spare parts is first proposed based on the prediction of remaining useful lifetime, and then a corresponding joint optimization model of preventive maintenance and spare parts inventory is established. Due to the complexity of the model, the combination method of genetic algorithm and Monte Carlo is presented to get the optimal maximum inventory level, safety inventory level, potential failure threshold, and appointment threshold to minimize the cost rate. Finally, the proposed model is studied through a case study and compared with both the separate optimization and the joint optimization without appointment policy, and the results show that the proposed model is more effective. In addition, the sensitivity analysis shows that the proposed model is consistent with the actual situation of maintenance practices and inventory management.

  5. Seismic qualification of nuclear control board by using base isolation technique

    International Nuclear Information System (INIS)

    Koizumi, T.; Tsujiuchi, N.; Fujita, T.

    1987-01-01

    The purpose is to adopt base isolation technique as a new approach for seismic qualification of nuclear control board. Basic concept of base isolation technique is expressed. Two dimensional linear motion mechanism with pre-tensioned coil springs and some dampers are included in the isolation device. Control board is regarded as a lamped mass system with inertia moment. Fundamental movement of this device and control board is calculated as a non-linear response problems. Fundamental analysis and numerical estimation, experimental investigation has been undertaken using an actual size control board. Sufficient agreement was recognized between experimental results and numerical estimation. (orig./HP)

  6. Nuclear Criticality Safety Organization qualification program. Revision 4

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1997-01-01

    The Nuclear Criticality Safety Organization (NCSO) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSO technical and managerial qualification as required by the Y-12 Training Implementation Matrix (TIM). It is implemented through a combination of LMES plant-wide training courses and professional nuclear criticality safety training provided within the organization. This Qualification Program is applicable to technical and managerial NCSO personnel, including temporary personnel, sub-contractors and/or LMES employees on loan to the NCSO, who perform the NCS tasks or serve NCS-related positions as defined in sections 5 and 6 of this program

  7. Instructor qualification for radiation safety training at a national laboratory

    International Nuclear Information System (INIS)

    Trinoskey, P.A.

    1994-10-01

    Prior to 1993, Health Physics Training (HPT) was conducted by the Lawrence Livermore National Laboratory (LLNL) health physics group. The job requirements specified a Masters Degree and experience. In fact, the majority of Health Physicists in the group were certified by the American Board of Health Physics. Under those circumstances, it was assumed that individuals in the group were technically qualified and the HPT instructor qualification stated that. In late 1993, the Health Physics Group at the LLNL was restructured and the training function was assigned to the training group. Additional requirements for training were mandated by the Department of Energy (DOE), which would necessitate increasing the existing training staff. With the need to hire, and the policy of reassignment of employees during downsizing, it was imperative that formal qualification standards be developed for technical knowledge. Qualification standards were in place for instructional capability. In drafting the new training qualifications for instructors, the requirements of a Certified Health Physicists had to be modified due to supply and demand. Additionally, for many of the performance-based training courses, registration by the National Registry of Radiation Protection Technologists is more desirable. Flexibility in qualification requirements has been incorporated to meet the reality of ongoing training and the compensation for desirable skills of individuals who may not meet all the criteria. The qualification requirements for an instructor rely on entry-level requirements and emphasis on goals (preferred) and continuing development of technical and instructional capabilities

  8. Sport Management Interns--Selection Qualifications.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1993-01-01

    Examines and rates the background qualifications and qualities, identified by sport management practitioners through an examination of paper credentials, that are desired in interviewees vying for selection into sport management internship positions. (GLR)

  9. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  10. Qualification Paths of Adult Educators in Sweden and Denmark

    Science.gov (United States)

    Andersson, Per; Kopsen, Susanne; Larson, Anne; Milana, Marcella

    2013-01-01

    The qualification of adult educators is a central aspect of the quality of adult education. However, within current policy discourses and adult education research on the professional development of prospective adult educators, little attention is paid to teacher qualification when compared to other fields of education and training. In this study,…

  11. Effect of Teacher's Qualification on the Performance of Senior Secondary School Physics Students: Implication on Technology in Nigeria

    Science.gov (United States)

    Owolabi, Olabode Thomas; Adedayo, Julius Olugbenga

    2012-01-01

    The study examined the effect of teacher's qualification on the performance of Senior Secondary School students in Physics. The purpose was to determine whether the status of the teacher has any impact on the performance of the students in Physics. The survey type of descriptive research design was adopted. The sample for the study consisted of…

  12. Predictors of Missed Research Appointments in a Randomized Placebo-Controlled Trial

    Directory of Open Access Journals (Sweden)

    Stéphanie J.E. Becker

    2014-09-01

     Younger patients with no college education, who believe their health can be controlled, are more likely to miss a research appointment when enrolled in a randomized placebo injection-controlled trial. 

  13. Selection, qualification and training of personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This standard provides criteria for the selection, qualification and training of personnel for stationary nuclear power plants. Qualifications, responsibilities, and training of personnel in operating and support organizations appropriate for the safe and efficient operation of nuclear power plants are addressed

  14. Passive autocatalytic recombiner process features and new status of international qualification

    International Nuclear Information System (INIS)

    Eckardt, Bernd A.; Losch, Norbert

    2010-01-01

    New results of International PAR-Severe Accidents Qualification in frame of EC/IRSN Core Melt Program PHEBUS (with real molten core) are presented. Example Results: AREVA PAR Design: Best performance very fast start-up • highest efficiency absolutely constant hydrogen depletion rates. Others: Some industrial competitors failed. This enveloping real severe accident tests represents the new international PAR qualification standard and finalized the PAR qualification successfully. The design features supports PAR Dual function

  15. Qualification of uranium-molybdenum alloy fuel - conclusions of an international workshop

    International Nuclear Information System (INIS)

    Snelgrove, J.L.; Languille, A.

    2000-01-01

    Thirty-one participants representing 21 reactors, fuel developers, fuel fabricators, and fuel reprocessors in 11 countries discussed the requirements for qualification of U-Mo alloy fuel at a workshop held at Argonne National Laboratory on January 17-18, 2000. Consensus was reached that the qualification plans of the U.S. RERTR program and the French U-Mo fuel development program are valid. The items to be addressed during qualification are summarized in the paper. (author)

  16. The implementing of the training, examination and qualification for QA auditor

    International Nuclear Information System (INIS)

    Ma Xiaozheng; Han Peicong; Zhang Zhongyuan; Zhu Guoliang

    2007-01-01

    China Power Investment Corporation has implemented the training, examination and qualification for QA auditor based on the related requirements of the nuclear safety documents. The bases, planning of the procedure, implementing procedure and suggestions for implementing the training, examination and qualification are described in this article. That can be used as the reference for implementing the training, examination and qualification for QA auditor, as well as for establishment of the related guide. (authors)

  17. Understanding to requirements for educational level in qualification of reactor operators

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhou Limin

    2007-01-01

    Requirements for qualification of reactor operators in nuclear safety regulations were discussed in this paper. The new issue was described in the confirmation of education level of reactor operators. The understanding to the requirements for Educational Level in Qualification of Reactor Operators was provided according to Higher Education Law of the People's Republic of China. It was proposed to improve the confirmation of qualification of reactor operators as soon as possible. (authors)

  18. NFC based Inspection and Qualification Management (NIQM) System Preventing Counterfeit and Fraudulent Item

    International Nuclear Information System (INIS)

    Chang, Choong Koo; Kim, Young Joo

    2013-01-01

    Design, manufacturing, fabrication, transportation and installation of the devices and equipment for nuclear power plants shall be conducted under the thorough quality assurance program for the nuclear safety. However, from late in the 1980s, NRC began to issue a number of communications alerting licenses to issues involving counterfeit and fraudulent items. A number of incidents identified by the NRC in the 1980s and 1990s catalyzed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to develop the NFC (Near Field Communication) based Inspection and Qualification Management(NIQM) system preventing counterfeit and fraudulent items. NFC is one of the latest wireless communication technologies. As a short-range wireless connectivity technology, NFC offers safe-yet simple and intuitive-communication between electronic devices. As described above, NFC technology can be applied to the inspection and qualification management system very effectively to prevent counterfeit and fraudulent items. In addition, NIQM system can use existing data and information through the interface with legacy system

  19. NFC based Inspection and Qualification Management (NIQM) System Preventing Counterfeit and Fraudulent Item

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Choong Koo; Kim, Young Joo [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    Design, manufacturing, fabrication, transportation and installation of the devices and equipment for nuclear power plants shall be conducted under the thorough quality assurance program for the nuclear safety. However, from late in the 1980s, NRC began to issue a number of communications alerting licenses to issues involving counterfeit and fraudulent items. A number of incidents identified by the NRC in the 1980s and 1990s catalyzed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to develop the NFC (Near Field Communication) based Inspection and Qualification Management(NIQM) system preventing counterfeit and fraudulent items. NFC is one of the latest wireless communication technologies. As a short-range wireless connectivity technology, NFC offers safe-yet simple and intuitive-communication between electronic devices. As described above, NFC technology can be applied to the inspection and qualification management system very effectively to prevent counterfeit and fraudulent items. In addition, NIQM system can use existing data and information through the interface with legacy system.

  20. 12 CFR 563c.3 - Qualification of public accountant.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Qualification of public accountant. 563c.3... REQUIREMENTS Form and Content of Financial Statements § 563c.3 Qualification of public accountant. (See also 17 CFR 210.2-01.) The term “qualified public accountant” means a certified public accountant or licensed...

  1. Kwalifikacje i kompetencje trenerów personalnych a oczekiwania rynku pracy = Personal trainers professional qualifications - demands of the labour market

    Directory of Open Access Journals (Sweden)

    Aleksandra Leśniewska

    2016-09-01

    Abstract Fitness has been a growth industry over the past years and seems not to be saturated on the polish ground. Fitness clubs offer a wide range of services to their clients from group classes to individual trainings such as personal training. However, personal trainers in Poland have conducive and effortless way to access to their profession, they still struggle with the lack of professional standards and incoherent educationa; system. The main purpose of this article was to define what are the demands of the labour market in terms of required qualifications and competences for personal trainers who are taking part in recruitment process.   Keywords: personal trainer, fitness services, qualifications and competencies, labour market

  2. Unresolved Safety Issue A-46 - seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Anderson, N.

    1985-01-01

    Seismic Qualification of Equipment in Operating Plants was designated as an Unresolved Safety Issue (USI) in December, 1980. The USI A-46 program was developed in early 1981 to investigate the adequacy of mechanical and electrical equipment in operating plants to withstand a safe shutdown earthquake. The approach taken was to develop viable, cost effective alternatives to current seismic qualification licensing requirements which could be applied to operating nuclear power plants. The tasks investigated include: (1) identification of seismic sensitive systems and equipment; (2) assessment of adequacy of existing seismic qualification methods; (3) development and assessment of in-situ test procedures to assist in qualification of equipment; (4) seismic qualification of equipment using seismic experience data; and (5) development of methods to generate generic floor response spectra. Progress to date and plans for completion of resolution are reported

  3. 78 FR 53025 - Pilot Certification and Qualification Requirements for Air Carrier Operations; Correction

    Science.gov (United States)

    2013-08-28

    ...-0100; Amdt. No. 141-17A] RIN 2120-AJ67 Pilot Certification and Qualification Requirements for Air... regulations to create new certification and qualification requirements for pilots in air carrier operations..., the FAA published a final rule entitled, ``Pilot Certification and Qualification Requirements for Air...

  4. 77 FR 15585 - Privacy Act; Implementation

    Science.gov (United States)

    2012-03-16

    ... way the economy; a sector of the economy; productivity; competition; jobs; the environment; public... used solely to determine individual qualifications for appointment or promotion in the Federal service...

  5. 76 FR 56 - Privacy Act; Implementation

    Science.gov (United States)

    2011-01-03

    ...; productivity; competition; jobs; the environment; public health or safety; or State, local, or Tribal... determine individual qualifications for appointment or promotion in the Federal service or military service...

  6. Qualification issues: the rest of the iceberg

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Luna, R.E.

    1978-01-01

    Reactor safety has been a primary concern since the beginning of commercial power reactor development. But only since the IEEE became actively involved (circa-1970), through IEEE-323-1971 and its predecessor drafts, has the qualification of selected Class 1 equipment been formalized and intensified. Currently EPRI and the USNRC are funding significant qualification research programs. However, these current research topics address only a few of the issues and there are more to come. A review of recent achievements and a discussion of some issues still to be encountered are presented

  7. Minimum qualifications for nuclear criticality safety professionals

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1990-01-01

    A Nuclear Criticality Technology and Safety Training Committee has been established within the U.S. Department of Energy (DOE) Nuclear Criticality Safety and Technology Project to review and, if necessary, develop standards for the training of personnel involved in nuclear criticality safety (NCS). The committee is exploring the need for developing a standard or other mechanism for establishing minimum qualifications for NCS professionals. The development of standards and regulatory guides for nuclear power plant personnel may serve as a guide in developing the minimum qualifications for NCS professionals

  8. 22 CFR 11.20 - Foreign Service specialist career candidate appointments.

    Science.gov (United States)

    2010-04-01

    ..., background investigation, and final review process required of career candidates, but normally they will not... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Foreign Service specialist career candidate... SERVICE OFFICERS § 11.20 Foreign Service specialist career candidate appointments. (a) General...

  9. Generic test procedure for the qualification of a nuclear emergency generator

    International Nuclear Information System (INIS)

    Simonis, J.C.; Bowman, S.W.

    1985-01-01

    This paper describes the proposed analytical and experimental procedures for the qualification of the standby generators and exciters used in the Emergency Diesel Generator Systems in a nuclear power plant. The components which require qualification are identified through a failure mode analysis of the systems conducted using engineering drawings updated to include all field changes. The qualification of each component includes the margins given in IEEE Std. 323-1974, ''Qualifying Class 1E Equipment for Nuclear Power Generating Stations.'' These margins are combined with the plant specific data to define an enveloping set of environmental parameters. This set of enveloping parameters, plus margin, form the bases for the analysis or test qualification tasks. Proposed qualification of the composite electrical insulation systems used in the generator and exciter on the form or random wound coils is by traceable testing. However, before testing the thermal and radiation degradation data used in the design of the generator and exciter are evaluated to identify if these data are sufficiently traceable to eliminate the need for additional insulation tests. The required tests are guided by applicable standards

  10. 76 FR 10945 - San Luis Trust Bank, FSB, San Luis Obispo, CA; Notice of Appointment of Receiver

    Science.gov (United States)

    2011-02-28

    ... DEPARTMENT OF THE TREASURY Office of Thrift Supervision San Luis Trust Bank, FSB, San Luis Obispo, CA; Notice of Appointment of Receiver Notice is hereby given that, pursuant to the authority... appointed the Federal Deposit Insurance Corporation as sole Receiver for San Luis Trust Bank, FSB, San Luis...

  11. Qualification of non-destructive examination for belgian nuclear reactor pressure vessel inspection

    International Nuclear Information System (INIS)

    Couplet, D.; Francoise, T.

    2001-01-01

    In Service Inspection (ISI) participates to the assessment of Nuclear Reactor Pressure Vessel Integrity. The performance of Non Destructive Examination (NDE) techniques must be demonstrated according to predefined objectives. The qualification process is essential to trust the reliability of the information provided by NDE. In Belgian Nuclear Power Plants, the qualification was conducted through a collaboration between the vendor and a technical group from the Electricity Utility. The important facts of this qualification will be presented: - the detailed definition of the inspection and qualifications objectives, based on a combination of the ASME code and the European Methodology for Qualification; - the systematic verification of the NDE performance and limitations, for each ISI objective, through an adequate combination of tests on blocks and technical justification; - the continuous improvement of the NDE procedure; - the feedback and the lessons learnt from site experience; - the necessary multi-disciplinary approach (NDE, degradation mechanisms, structural integrity)

  12. Impact of pre-conditioning on the qualification of safety-related equipment

    International Nuclear Information System (INIS)

    Isgro, J.R.

    1982-01-01

    This paper shares some recent experiences on the effects of preconditioning on the qualification of safety-related equipment not located in a harsh environment. Environmental and seismic qualification testing programs were conducted following the guidelines of IEEE 323-1974, IEEE 344-1975 and appropriate IEEE daughter standards, where available. The examples that follow will illustrate the degree of pre-conditioning of safety-related equipment qualified to the requirements of IEEE-323-1974, and its effect on the outcome of the qualification program

  13. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  14. 76 FR 73521 - Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service Law

    Science.gov (United States)

    2011-11-29

    ... 3206-AM06 Statutory Bar to Appointment of Persons Who Fail To Register Under Selective Service Law... statutory bar on employment in an Executive agency of an individual who was required to register with the... as follows: Subpart G--Statutory Bar to Appointment of Persons Who Fail To Register Under the...

  15. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  16. Return of IEEE Std 627 and its Value to Equipment Qualification Programs

    International Nuclear Information System (INIS)

    Horvath, D.A.

    2012-01-01

    IEEE Std 627 ''Design Qualification of Safety Systems Equipment Used in Nuclear Power Generating Stations'' was issued to more generically establish qualification requirements in the form of a high level umbrella document. Efforts on this standard began in late 1975 at the request of the IEEE Nuclear Standards Management Board. In 1977 a joint ASME/IEEE agreement established responsibility for qualification and quality assurance standards preparation. ASME accepted responsibility for Quality Assurance and IEEE for qualification. In accordance with that agreement, IEEE completed the generic qualification standard in 1980. This document provided high level approaches, criteria, guidance, and principles for qualification of both electrical and mechanical equipment that at that time appeared in no other industry standard. IEEE Std 627-1980 was later reaffirmed in 1996. In 1986, ASME's Board on Nuclear Codes and Standards directed its Committee on Qualification of Mechanical Equipment (QME) to develop a standard for qualifying mechanical equipment. This task was completed in several parts during the time frame from 1992 to 1994. Partly in response to this activity, IEEE Std 627 was withdrawn in 2002. Later although withdrawn, it was found that IEEE Std 627 was continuing to be used and referenced by many entities both in the US and other countries including in ASME's QME-1-2002 ''Qualification of Active Mechanical Equipment Used in Nuclear Power Plants'', US NRC's NUREG-0800 Standard Review Plan Section 3.11, at least one reactor vendor's Design Certification Document (DCD), several international licensing documents, and elsewhere. As a result, in 2007, the IEEE Standards Board authorized Working Group 2.10 of Subcommittee 2 (Qualification) of the Power and Energy Society's Nuclear Power Engineering Committee to resurrect and update IEEE Std 627-1980 (Reaff 1996). The result was the culmination IEEE Std 627 in 2010. This paper will report on the eight improvements made

  17. Hardships of end-of-life care with court-appointed guardians.

    Science.gov (United States)

    Hastings, Kylie B

    2014-02-01

    In the United States, the court-appointed guardians do not have the ability to make decisions regarding end-of-life (EOL) care for their clients. Additionally, the process of initiating EOL care measures can be slow and cumbersome, despite an existing process of getting approval for such care. This process has the potential to prolong suffering and delay imperative decisions. This article reviews the hardships that patients, court-appointed guardians, and health care staff endure while moving through the oppressive process of obtaining EOL care orders through the court. This article also proposes ways of tuning up the laws, regulations, and communications to make it easier and faster to obtain orders regarding EOL care to preserve the dignity of our patients and loved ones. "A guardianship is a legal relationship created when a person or institution named in a will or assigned by the court to take care of minor children or incompetent adults."

  18. 25 CFR 117.26 - Expenses incurred pending qualification of an executor or administrator.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Expenses incurred pending qualification of an executor or... HAVE CERTIFICATES OF COMPETENCY § 117.26 Expenses incurred pending qualification of an executor or administrator. Pending the qualification of the executor or administrator of the estate of a deceased Indian of...

  19. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  20. Qualifications and Competencies for Population Health Management Positions: A Content Analysis of Job Postings.

    Science.gov (United States)

    Meyer, Melanie

    2017-12-01

    The need for population health management expertise has increased as the health care industry shifts toward value-based care. However, many organizations report hiring gaps as they seek to fill positions. The purpose of this study was to analyze the types of population health management positions for which health care organizations are hiring, including qualifications and competencies required for these positions. A content analysis was conducted on 271 job postings collected during a 2-month period. A typology of qualifications and competencies was developed based on the content analysis. Profiles were generated for the top 5 job title classifications: directors, coordinators, care managers, analysts, and specialists. This study highlights the investment health care organizations are making in population health management and the prominent role these positions are playing in the health care environment today. Many organizations are building out population health management teams resulting in multiple positions at different levels being added. As the market demands competent candidates who are equipped with specialized population health expertise as well as practical experience in program development, technology applications, care management, and analytics, professional education programs will need to adapt curricula to address the required areas. Competencies for specific job title classifications may need further evaluation and refinement over time. Study results can be used by organizations for strategic planning, by educators to target needed qualifications and competencies, and by researchers and policy advisors to assess progress toward value-based care.

  1. The path from biomarker discovery to regulatory qualification

    CERN Document Server

    Goodsaid, Federico

    2013-01-01

    The Path from Biomarker Discovery to Regulatory Qualification is a unique guide that focuses on biomarker qualification, its history and current regulatory settings in both the US and abroad. This multi-contributed book provides a detailed look at the next step to developing biomarkers for clinical use and covers overall concepts, challenges, strategies and solutions based on the experiences of regulatory authorities and scientists. Members of the regulatory, pharmaceutical and biomarker development communities will benefit the most from using this book-it is a complete and practical guide to biomarker qualification, providing valuable insight to an ever-evolving and important area of regulatory science. For complimentary access to chapter 13, 'Classic' Biomarkers of Liver Injury, by John R. Senior, Associate Director for Science, Food and Drug Administration, Silver Spring, Maryland, USA, please visit the following site:  http://tinyurl.com/ClassicBiomarkers Contains a collection of experiences of different...

  2. Qualification of flat welding of nuclear fuel bars

    International Nuclear Information System (INIS)

    Romero C, J.; Rivera M, H.

    2001-01-01

    The qualification of flat welding consists in the process (procedures (11), instructions (5), specifications (4) and programs (3)) and equipment (systems (4), equipment (6)) with the Personal Qualification (operators and supervisors) that was done in simultaneous form and supported with test and training programs with its respective technical reports, liberated by the Quality Assurance Office of ININ. Moreover, specific procedures of process and personal qualification are realized with the respective supervision by Quality Assurance Office. For the process, 20 welding were realized as follow: 5 welding with maximum contributing of heat, 10 welding with nominal contributing of heat, 5 welding with minimum contributing of heat. The heat contributing for the qualification was done maximum, of increasing the welding current, diminishing the helium flux and the revolutions per minute of the bar, at the moment of welding, with respect to nominal values. In the minimum contributing of heat it is diminished the welding current, increasing the helium flux and the revolutions per minute of the bar with respect to nominal values. With the qualification it has been finished the development of flat welding with results which define an own method of ININ. It was implemented a pneumatic system, for the elimination of micron cracks. It was required a control of turn velocity of the bar of hundredth of revolution. Moreover the main welding parameters each 40 μs are acquired. Also it was automated completely the process to avoid possible human mistakes. The standard deviations of the values of the realized inspections in the quality, are lower. Process, equipment and personnel with their respective Quality reports and registries are qualified, as well as the Quality certificates of two operators and one supervisor. (Author)

  3. Approaches taken by South African advertisers to select and appoint ...

    African Journals Online (AJOL)

    Pitch and industry guidelines play an important role in awarding advertising agency contracts, but agencies must take into account that not all advertisers will adhere to these guidelines. The exploratory research study on which this article reports provides insight into the appointment process and selection criteria applied ...

  4. Re-qualification of MTR-type fuel plates fabrication process

    International Nuclear Information System (INIS)

    Elseaidy, I.M.; Ghoneim, M.M.

    2010-01-01

    The fabricability issues with increased uranium loading due to use low enrichment of uranium (LEU), i.e. less than 20 % of U 235 , increase the problems which occur during compact manufacturing, roll bonding of the fuel plates, potential difficulty in forming during rolling process, mechanical integrity of the core during fabrication, potential difficulty in meat homogeneity, and the ability to fabricate plates with thicker core as a means of increasing total uranium loading. To produce MTR- type fuel plates with high uranium loading (HUL) and keep the required quality of these plates, many of qualification process must be done in the commissioning step of fuel fabrication plant. After that any changing of the fabrication parameters, for example changing of any of the raw materials, devises, operators, and etc., a re- qualification process should be done in order to keep the quality of produced plates. Objective of the present work is the general description of the activities to be accomplished for re-qualification of manufacturing MTR- type nuclear fuel plates. For each process to be re-qualified, a detailed of re-qualification process were established. (author)

  5. 41 CFR 102-3.130 - What policies apply to the appointment, and compensation or reimbursement of advisory committee...

    Science.gov (United States)

    2010-07-01

    ... committee staff person who is not a current Federal employee serving under an assignment must be appointed... the appointment, and compensation or reimbursement of advisory committee members, staff, and experts... compensation or reimbursement of advisory committee members, staff, and experts and consultants? In developing...

  6. Emergency Management. Functional Area Qualification Standard

    National Research Council Canada - National Science Library

    2004-01-01

    .... In support of this goal, the competency requirements defined in the Technical Qualification Standards should be aligned with and integrated into the recruitment and staffing processes for technical positions...

  7. Qualification of quality testing personnel, in particular the training offered

    International Nuclear Information System (INIS)

    Knoedler, D.

    1980-01-01

    Personnel qualification is one of the most important tasks of quality assurance. The qualification is reached by professional education, by experience made on the job and by additional external and company-internal training. A determination of qualification requirements should cover only the general principles. Especially this should be considered specifying the requirements for theoretical knowledge and for examinations since the factor of relevant experience is difficult to be estimated by third parties. Equal principles apply for the personnel of the manufacturer, of the main contractor, of the utility and of the auhtorized inspectors' organizations. The detailed guidelines should be part of the internal QA-systems of the organizations involved. (orig.) [de

  8. 31 CFR 370.5 - How can I appoint a financial institution to receive payments on my behalf?

    Science.gov (United States)

    2010-07-01

    ... Entries § 370.5 How can I appoint a financial institution to receive payments on my behalf? You must name a financial institution to receive payments through credit entries using the ACH method. You also... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false How can I appoint a financial...

  9. Space qualification of an experimental two-phase flow thermal management system

    International Nuclear Information System (INIS)

    Koonmen, J.P.; Carswell, L.C.; Kvansnak, M.A.

    1991-01-01

    The Weapons Laboratory will launch a space experiment in March 1991 to investigate the effects of extended microgravity on two-phase (liquid/vapor) flow. The qualification process for the experimental flight system hardware differs significantly from the process used for complex, high cost, long life space systems. Some development, qualification, and acceptance tests normally included in the test program of an operational space system were omitted because of the low program cost and low consequence of experiment failure. Key environment and functional qualification tests were performed, however, in an effort to reduce the risk of failure inherent in any space mission. The environmental qualification program included short duration vacuum chamber tests, reduced gravity missions onboard a National Aeronautics and Space Administration (NASA) test aircraft, and a complete series of shock and vibration tests. The functional qualification program centered on thermal-hydraulic system performance tests and a complete check-out of the unique telemetry system used to retrieve the experimental data from the payload. The test program also contains a number of acceptance and prelaunch validation tests to be performed as final verification of payloads readiness for spaceflight

  10. EXTENSION EDUCATION SYMPOSIUM: Getting the most out of your extension appointment and still having a life.

    Science.gov (United States)

    Powers, W; Cockett, N; Lardy, G

    2017-04-01

    Managing the demands of an academic appointment in extension can be a challenging task. Demands from constituent groups, expectations of supervisors, and rigors of promotion and tenure processes can create pressures that young faculty did not expect. Throw in spousal and family duties and you have created a situation that many will find hard to navigate. However, there are ways to cope and, even better news, there are ways to excel in meeting the demands of an academic appointment and enjoying life. Because many new extension faculty members do not have prior experience in extension, best practices in documenting programs and extension scholarship over the pretenure period are provided in this paper. Appointments that include both research and extension are quite common at many land grant universities. The advantages of joint appointments are numerous and include the fact that more and more grant agencies are seeking integrated research, teaching, and/or extension projects. However, the time demands of joint appointments can be challenging. Joint appointments can be designed to help faculty members conduct important translational research and have it be applied in a production setting. By seeking commonalities in research and extension efforts, joint appointments can be very synergistic. Development of highly successful programs requires planning on the front end with an emphasis on an in-depth needs assessment to determine stakeholder needs for both research and extension. Impact assessment should be part of this planning effort. Performing as a successful extension faculty member while maintaining relationships outside of work is challenging and requires deliberate effort on the part of employees and supervisors to realize there is more to life than work. Some authors have referred to this as work-life balance, but it may be more helpful to think of it as work-life effectiveness. To do this, one needs to 1) define what success looks like, 2) set boundaries and

  11. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels

    International Nuclear Information System (INIS)

    Elfving, K.

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included

  12. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  13. Qualifications Frameworks and their conflicting social imaginaries of globalisation

    DEFF Research Database (Denmark)

    Sarauw, Laura Louise

    2013-01-01

    Critics of the European Bologna process often see it as a univocal standardization of higher education. By exploring how different qualifications frameworks currently project unlike imaginaries of and responses to globalisation, this article takes a different stance. As a key point, I argue...... that the well-known imaginary of globalisation as a change towards a more diverse and unforeseeable world, which calls for the development of flexible, lifelong learners with a broad knowledge base and strong democratic competencies that we find in the overarching qualifications framework of the Bologna process......, is a highly contested imaginary. In contrast, for example, the Danish qualifications framework of 2003 projects an imaginary of globalisation as a change towards a smaller and more predictable world, which enables a novel and more efficient alignment of the curriculum towards specific professional needs...

  14. Appointment reminder systems are effective but not optimal: results of a systematic review and evidence synthesis employing realist principles

    Directory of Open Access Journals (Sweden)

    McLean SM

    2016-04-01

    Full Text Available Sionnadh Mairi McLean,1 Andrew Booth,2 Melanie Gee,3 Sarah Salway,2 Mark Cobb,4 Sadiq Bhanbhro,3 Susan A Nancarrow5 1Faculty of Health and Wellbeing, Sheffield Hallam University, Sheffield, UK; 2School of Health and Related Research, University of Sheffield, Sheffield, UK; 3Centre for Health and Social Care Research, Sheffield Hallam University, Sheffield, UK; 4Therapeutics & Palliative Care, Sheffield Teaching Hospitals, Sheffield, UK; 5School of Health and Human Science, Southern Cross University, East Lismore, NSW, Australia Abstract: Missed appointments are an avoidable cost and resource inefficiency which impact upon the health of the patient and treatment outcomes. Health care services are increasingly utilizing reminder systems to manage these negative effects. This study explores the effectiveness of reminder systems for promoting attendance, cancellations, and rescheduling of appointments across all health care settings and for particular patient groups and the contextual factors which indicate that reminders are being employed sub-optimally. We used three inter-related reviews of quantitative and qualitative evidence. Firstly, using pre-existing models and theories, we developed a conceptual framework to inform our understanding of the contexts and mechanisms which influence reminder effectiveness. Secondly, we performed a review following Centre for Reviews and Dissemination guidelines to investigate the effectiveness of different methods of reminding patients to attend health service appointments. Finally, to supplement the effectiveness information, we completed a review informed by realist principles to identify factors likely to influence non-attendance behaviors and the effectiveness of reminders. We found consistent evidence that all types of reminder systems are effective at improving appointment attendance across a range of health care settings and patient populations. Reminder systems may also increase cancellation and

  15. 26 CFR 25.2523(e)-1 - Marital deduction; life estate with power of appointment in donee spouse.

    Science.gov (United States)

    2010-04-01

    ... satisfied and S is treated as having a general power to appoint 100/250 of the entire interest in the 250... 26 Internal Revenue 14 2010-04-01 2010-04-01 false Marital deduction; life estate with power of... Deductions § 25.2523(e)-1 Marital deduction; life estate with power of appointment in donee spouse. (a) In...

  16. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Qualifications of fixed-satellite space station licensees. 25.140 Section 25.140 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications...

  17. Effect of second timed appointments for non-attenders of breast cancer screening in England: a randomised controlled trial.

    Science.gov (United States)

    Allgood, Prue C; Maroni, Roberta; Hudson, Sue; Offman, Judith; Turnbull, Anne E; Peacock, Lesley; Steel, Jim; Kirby, Geraldine; Ingram, Christine E; Somers, Julie; Fuller, Clare; Threlfall, Anthony G; Gabe, Rhian; Maxwell, Anthony J; Patnick, Julietta; Duffy, Stephen W

    2017-07-01

    In England, participation in breast cancer screening has been decreasing in the past 10 years, approaching the national minimum standard of 70%. Interventions aimed at improving participation need to be investigated and put into practice to stop this downward trend. We assessed the effect on participation of sending invitations for breast screening with a timed appointment to women who did not attend their first offered appointment within the NHS Breast Screening Programme (NHSBSP). In this open, randomised controlled trial, women in six centres in the NHSBSP in England who were invited for routine breast cancer screening were randomly assigned (1:1) to receive an invitation to a second appointment with fixed date and time (intervention) or an invitation letter with a telephone number to call to book their new screening appointment (control) in the event of non-attendance at the first offered appointment. Randomisation was by SX number, a sequential unique identifier of each woman within the NHSBSP, and at the beginning of the study a coin toss decided whether women with odd or even SX numbers would be allocated to the intervention group. Women aged 50-70 years who did not attend their first offered appointment were eligible for the analysis. The primary endpoint was participation (ie, attendance at breast cancer screening) within 90 days of the date of the first offered appointment; we used Poisson regression to compare the proportion of women who participated in screening in the study groups. All analyses were by intention to treat. This trial is registered with Barts Health, number 009304QM. We obtained 33 146 records of women invited for breast cancer screening at the six centres between June 2, 2014, and Sept 30, 2015, who did not attend their first offered appointment. 26 054 women were eligible for this analysis (12 807 in the intervention group and 13 247 in the control group). Participation within 90 days of the first offered appointment was

  18. Students' qualification in environmental and sustainability education—epistemic gaps or composites of critical thinking?

    Science.gov (United States)

    Hasslöf, Helen; Lundegård, Iann; Malmberg, Claes

    2016-01-01

    In an 'age of measurement' where students' qualification is a hot topic on the political agenda, it is of interest to ask what the function of qualification might implicate in relation to a complex issue as Education for Sustainable Development (ESD) and what function environmental and sustainability issues serve in science education. This paper deals with how secondary and upper secondary teachers in discussions with colleagues articulate qualification in relation to educational aims of ESD. With inspiration from discourse theory, the teachers' articulations of qualification are analysed and put in relation to other functions of education (qualification, socialisation and subjectification). The results of this study show three discourses of qualification: scientific reasoning, awareness of complexity and to be critical. The discourse of 'qualification as to be critical' is articulated as a composite of differing epistemological views. In this discourse, the teachers undulate between rationalistic epistemological views and postmodern views, in a pragmatic way, to articulate a discourse of critical thinking which serves as a reflecting tool to bring about different ways of valuing issues of sustainability, which reformulates 'matter of facts' towards 'matter of concerns'

  19. Challenges of equipment qualification using today's standards with emphasis on a class 1E motor program

    International Nuclear Information System (INIS)

    Deaton, K.

    1995-01-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed

  20. The effectiveness of SMS Reminders and the impact of patient characteristics on missed appointments in a public dental outpatient clinic

    OpenAIRE

    Emilia Bellucci; Lasitha Dharmasena; Lemai Nguyen; Hanny Calache

    2017-01-01

    This paper reports on the Failure To Attend (FTA) rate of appointments as well as patients following the implementation of SMS reminders in a public dental outpatient service.  Given the ineffectiveness of the intervention and a highly representative patient’s profile, this paper identifies the demographic characteristics of patients who miss all of their appointments.  Data on appointment attendance, patient demographics and dental service type was collected over a time period of 46 consecut...

  1. Actively cooled plasma facing components qualification, commissioning and health monitoring

    International Nuclear Information System (INIS)

    Escourbiac, F.; Durocher, A.; Grosman, A.; Courtois, X.; Farjon, J.-L.; Schlosser, J.; Merola, M.; Tivey, R.

    2006-01-01

    In modern steady state magnetic fusion devices, actively cooled plasma facing components (PFC) have to handle heat fluxes in the range of 10-20 MW/m 2 . This generates a number of engineering constraints: the armour materials must be refractory and compatible with plasma wall interaction requirements (low sputtering and/or low atomic number); the heat sink must offer high thermal conductivity, high mechanical resistance and sufficient ductility; the component cooling system -which is generally based on the circulation of pressurized water in the PFC's heat sink - must offer high thermal heat transfer efficiency. Furthermore, the assembling of the refractory armour material onto the metallic heat sink causes generic difficulties strongly depending on thermo-mechanical properties of materials and design requirements. Life time of the PFC during plasma operation are linked to their manufacturing quality, in particular they are reduced by the possible presence of flaw assembling. The fabrication of PFC in an industrial frame including their qualification and their commissioning - which consists in checking the manufacturing quality during and at the end of manufacture - is a real challenge. From experience gained at Tore Supra on carbon fibre composite flat tiles technology components, it was assessed that a set of qualifications activities must be operated during R(and)D and manufacturing phases. Dedicated Non Destructive Technique (NDT) based on advanced active infrared thermography was developed for this purpose, afterwards, correlations between NDT, high heat flux testing and thermomechanical modelling were performed to analyse damage detection and propagation, and define an acceptance criteria valuable for industrial application. Health monitoring using lock-in technique was also recently operated in-situ of the Tore Supra tokamak for detection of possible defect propagation during operations, presence of acoustic precursor for critical heat flux detection induced

  2. Personnel Officers: Judging Their Qualifications.

    Science.gov (United States)

    Webb, Gisela

    1988-01-01

    Discusses the backgrounds and qualifications appropriate for a library personnel administrator, including (1) a master's degree in library science; (2) library work experience; (3) additional training in administration, personnel management, organizational development, and psychology; and (4) personal attributes such as good communication skills,…

  3. Mutual Recogniton of Professional Qualifications

    DEFF Research Database (Denmark)

    Enemark, Stig; Plimmer, Francis

    The publication aims to review the concept of mutual recognition of qualifications within the world wide surveying community, and to develop a framework for the introduction of standards of global professional competence in this area. The publication also includes a number of case studies from...

  4. Qualification test on class 1E charger and inverter in nuclear power plant

    International Nuclear Information System (INIS)

    Li Mingcheng; Lin Jian; Fu Mingxing; Xu Benfu; Ma Peifeng

    2014-01-01

    The qualification approach for class lE electrical equipment was introduced, based on IEC, IEEE and RCC-E standards and technical documents. Combined with a lot of practical experience, the qualification scheme for class lE charger and inverter was developed. The component evaluation, performance and stress test, EMC test, seismic test and software qualification for the equipment were analyzed in detail. (authors)

  5. Fatigue qualification of high thickness composite rotor components

    Science.gov (United States)

    Raggi, M.; Mariani, U.; Zaffaroni, G.

    Fatigue qualification aspects of composite rotor components are presented according with the safe life procedure usually applied by helicopter manufacturers. Test activities are identified at three levels of specimen complexity: coupon, structural element and full scale component. Particular attention is given to high thickness laminates qualification as far as environmental exposure is concerned. A practical approach for an accelerated conditioning procedure is described. The application to a main rotor tension link is presented showing the negligible effect of the moisture absorption on its fatigue strength.

  6. Earthquake experience and seismic qualification by indirect methods in nuclear installations

    International Nuclear Information System (INIS)

    2003-01-01

    In recent years, many operational nuclear power plants around the world have conducted seismic re-evaluation programmes either as part of a review of seismic hazards or to comply with best international nuclear safety practices. In this connection, Member States have called on the IAEA to carry out several seismic review missions at their plants, primarily those of WWER and RBMK design. One of the critical safety issues that arose during these missions was that of seismic qualification (determination of fitness for service) of already installed plant distribution systems, equipment and components. The qualification of new components, equipment and distribution systems cannot be replicated for equipment that is already installed and operational in plants, as this process is neither feasible nor appropriate. For this reason, seismic safety experts have developed new procedures for the qualification of installed equipment: these procedures seek to demonstrate that installed equipment, through a process of comparison with new equipment, is apt for service. However, these procedures require large sets of criteria and qualification databases and call for the use of engineering judgement and experience, all of which open the door to wide margins of interpretation. In order to guarantee a sound technical basis for the qualification of in-plant equipment, currently applied to 70% to 80% of all plant equipment, the regulatory review of this type of qualification process calls for a detailed assessment of the technical procedures applied. Such an assessment is the first step towards eliminating the risk of large differences in qualification results between different plants, operators and countries, and guaranteeing the reliability of seismic re-evaluation programmes. Bearing this in mind, in 1999, the IAEA convened a seminar and technical meeting on seismic qualification under the auspices of the IAEA Technical Co-operation programme. Altogether 66 senior experts attended the

  7. Hanford Waste Vitrification Plant Quality Assurance Program description for defense high-level waste form development and qualification

    International Nuclear Information System (INIS)

    Hand, R.L.

    1992-01-01

    This document describes the quality assurance (QA) program of the Hanford Waste Vitrification Plant (HWVP) Project. The purpose of the QA program is to control project activities in such a manner as to achieve the mission of the HWVP Project in a safe and reliable manner. A major aspect of the HWVP Project QA program is the control of activities that relate to high-level waste (HLW) form development and qualification. This document describes the program and planned actions the Westinghouse Hanford Company (Westinghouse Hanford) will implement to demonstrate and ensure that the HWVP Project meets the US Department of Energy (DOE) and ASME regulations. The actions for meeting the requirements of the Waste Acceptance Preliminary Specifications (WAPS) will be implemented under the HWVP product qualification program with the objective of ensuring that the HWVP and its processes comply with the WAPS established by the federal repository

  8. Sustained qualification process for full scope nuclear power plant simulators

    International Nuclear Information System (INIS)

    Pirson, J.; Stubbe, E.; Vanhoenacker, L.

    1994-01-01

    In the past decade, simulator training for all nuclear power plant operators has evolved into a vital requirement. To assure a correct training, the simulator qualification process is an important issue not only for the initial validation but also following major simulator updates, which are necessary during the lifetime of the simulator. In order to avoid degradation of the simulator validated software, the modifications have to be introduced according to a rigorous methodology and a practical requalification process has to be applied. Such methodology has to be enforced at every phase of the simulator construction or updating process from plant data package constitution, over simulator software development to simulator response qualification. The initial qualification and requalification process is based on the 3 levels identified by the ANSI/ANS 3-5 standard for steady-state, operational transients and accident conditions. For the initial certification of the full scope simulators in Belgium, a practical qualification methodology has been applied, which has been adapted into a set of non regression tests for the requalification after major simulator updates. (orig.) (4 refs., 3 figs.)

  9. Qualification of RETRAN for simulator applications

    International Nuclear Information System (INIS)

    Harrison, J.F.

    1988-01-01

    The use of full-scope control room replica simulators increased substantially following the accident at Three Mile Island Unit 2. The technical capability required to represent severe events has been included, in varying degrees, in most simulators purchased since the TMI-2 accident. The ability of the instructor to create a large variety of combinations of malfunctions has also greatly expanded. The nuclear industry has developed a standard which establishes the minimum functional requirements for full-scope nuclear control room simulators used for operator training. This standard, ANSI/ANS-3.5, was first issued in 1981 and was reissued in 1985. A method for performing simulator qualification with best estimate analytical data has been proposed in EPRI NP-4243, Analytic Simulator Qualification Methodology. The idea presented there is to choose a set of transients which drive the simulator into all the system conditions (dynamic states) likely to be encountered during operator training. The key observable parameters for each state are compared to analyses performed with the best estimate analytical model The closeness of the comparison determines the fidelity of the simulator. The approach described in EPRI NP-4243 has been adapted for evaluating RETRAN's capability for use in simulator qualification. RETRAN analyses which compare the RETRAN results to plant or test facility data are evaluated with respect to the simulator test matrix documented in EPRI NP-4243

  10. An international survey of MRI qualification and certification frameworks with an emphasis on identifying elements of good practice

    International Nuclear Information System (INIS)

    Castillo, J.; Caruana, C.J.; Morgan, P.S.; Westbrook, C.; Mizzi, A.

    2017-01-01

    The purpose of the study was to survey MRI qualification and certification frameworks in the major English-speaking countries (Australia, New Zealand, US, Canada, UK, Ireland) with the aim of identifying elements of good practice. The intention is to incorporate these elements in a national framework that could be used in supporting an MRI specialist register. The study was conducted using document analysis of MRI qualification and certification documents from these states with data triangulated through a web-based questionnaire amongst an expert group of MRI radiographers (n = 59) from the same states. Based on the results of the study, recommendations have been put forward for those countries that are in the process of developing such frameworks. The main recommendations include that a professional or regulatory body externally accredits MRI programmes and that learning outcomes be based on an MRI competence profile that addresses current and forecasted needs of the particular country. The MRI competence profile should encompass a novice-to expert continuum and be referenced directly to a national qualification framework. Ideally each level of expertise should be assessed and evidenced by a portfolio of CPD activities, including clinical and management case studies appropriate to that level. - Highlights: • Professional or regulatory bodies should accredit MRI academic programmes. • Competence profiles should reflect and support local MRI services. • MRI competence profiles should be structured in a novice-to-expert continuum format. • Competence profiles should reference national qualification/certification frameworks. • Mandatory certification could lead to registration in an MRI specialist register.

  11. The Changing Distribution of Teacher Qualifications Across Schools: A Statewide Perspective Post-NCLB

    Directory of Open Access Journals (Sweden)

    Karen J. DeAngelis

    2010-11-01

    Full Text Available A number of recent policy initiatives, including NCLB's highly qualified teacher provisions, have sought to improve the qualifications of teachers and their distribution across schools. Little is known, however, about the impact of these policies. In this study, we use population data on teachers and schools in Illinois to examine changes in the level and distribution of teacher qualifications from 2001 to 2006. We find that schools in Chicago, especially those serving the highest percentages of low-income and minority students, experienced the greatest improvements in teacher qualifications during the period. In addition, high-poverty schools in most other locales in the state registered small to moderate improvements, which narrowed the gap in teacher qualifications between high- and low-poverty schools across Illinois. Improvements in the certification status of experienced teachers and the recruitment of new teachers with stronger academic qualifications both contributed to these gains. The results reveal a tradeoff for disadvantaged schools seeking to improve both teacher qualifications and teacher experience levels, thereby calling into question the near-term feasibility of NCLB provisions that aim to simultaneously eliminate inequities across schools in both.       

  12. 7 CFR 4290.360 - Initial review of Applicant's management team's qualifications.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Initial review of Applicant's management team's...'s management team's qualifications. The Secretary will review the information submitted by the Applicant concerning the qualifications of the Applicant's management team to determine in his or her sole...

  13. Qualification criteria to certify a package for air transport of plutonium

    International Nuclear Information System (INIS)

    1977-12-01

    The document describes qualification criteria developed by the U.S. Nuclear Regulatory Commission to certify a package for air transport of plutonium. Included in the document is a discussion of aircraft accident conditions and a summary of the technical basis for the qualification criteria. The criteria require prototype packages to be subjected to various individual and sequential tests that simulate the conditions produced in severe aircraft accidents. Specific post-test acceptance standards are prescribed for each of the three safety functions of a package. The qualification criteria also prescribe certain operational controls to be exercised during transport

  14. Qualification and certification in NDT

    International Nuclear Information System (INIS)

    Hassan Kavarodi Maracair

    2003-01-01

    Ruane-TATI Sdn Bhd was the first accredited training centre in Asia approved by The British Institute of Non Destructive Testing (BINDT) as per EN 473, ISO 9712 and EN 45013 requirements. Meanwhile, Ruane-TATI is also accredited by National Vocational Training Center ( MLVK ).This mean that Ruane-TATI is the first training and examination center that accredited by both international and national bodies in providing quality , qualification and certification for comprehensive training and examination in Inspection and Non Destructive Testing (NDT). There are several NDT examinations scheme available in Malaysia due to differences requirement from the industrials. This has put the difficulties to services company in upgrading their NDT technician qualifications. The intention of this paper is to discuss the basic different among the NDT examinations scheme used in Malaysia ( mostly offered by Ruane-TATI ) and the development of certain schemes in covering their schemes to more sectors and NDT methods. (Author)

  15. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2001-01-01

    The overall training system and the development of projects for training of all categories of NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce staff were the subject of Nuclear Regulatory Authority of the Slovak Republic (UJD) attention. During 2000, the following inspections were carried out on nuclear personnel training: (a) NPP Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff ; (b) NPP Mochovce: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; an inspection focused on verifying the simulator aided training; an inspection focused on checking the preparedness of NPP Mochovce operation and technical personnel for NPP Mochovce Unit 2 operation; (c) Technology for treatment and conditioning of radioactive waste Bohunice (BSC): an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff; VUJE Trnava: verification of technical equipment and professional skills of VUJE Trnava staff and tasks arising out of the 'Authorisation on nuclear installation staff training'. Examinations of selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPPs. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under

  16. Supreme Court Appointment Process: Roles of the President, Judiciary Committee, and Senate

    National Research Council Canada - National Science Library

    Rutkus, Denis S

    2007-01-01

    .... Under the Constitution, Justices on the Supreme Court receive lifetime appointments. Such job security in the government has been conferred solely on judges and, by constitutional design, helps insure the Court's independence from the President...

  17. Teacher qualification and the achievement gap in early primary grades.

    Directory of Open Access Journals (Sweden)

    Donald Easton-Brooks

    2009-08-01

    Full Text Available Title I of the No Child Left Behind Act (P.L. 107-110, 115 Stat. 1245, 2002 holds schools accountable for reducing the academic achievement gap between the different ethnic groups and requires elementary school teachers to have at least a bachelors degree and a state certification. The purpose of this study was to examine the relationship of the qualification requirement of NCLB to the goal of reducing the academic achievement gap. The study found that students with a certified teacher for most of their early school experience scored higher in reading than students who did not have a certified teacher. In addition, certification was associated with slightly narrowing the academic gap between African American and European American students across early elementary grades.

  18. Data Qualification guidelines

    International Nuclear Information System (INIS)

    Edwards, T.B.; Shine, E.P.

    1992-01-01

    Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process

  19. Nuclear power reactor security personnel training and qualification plan reviewer workbook

    International Nuclear Information System (INIS)

    1979-06-01

    The Training and Qualification Plan Reviewer Workbook has been developed to provide the information required for evaluating the adequacy of the Training and Qualification (T and Q) Plans developed to meet the requirements of 10 CFR 73.55(b)(4) and 10 CFR 73, Appendix B

  20. Seismic and dynamic qualification methods

    International Nuclear Information System (INIS)

    Lin, C.W.

    1985-01-01

    This book presents the papers given at a conference on seismic effects on nuclear power plants. Topics considered at the conference included seismic qualification of equipment, multifrequency test methodologies, damping in piping systems, the amplification factor, thermal insulation, welded joints, and response factors for seismic risk analysis of piping

  1. Nuclear power plants. Electrical equipment of the safety system. Qualification

    International Nuclear Information System (INIS)

    2001-01-01

    This International Standard applies to electrical parts of safety systems employed at nuclear power plants, including components and equipment of any interface whose failure could affect unfavourably properties of the safety system. The standard also applies to non-electrical safety-related interfaces. Furthermore, the standard describes the generic process of qualification certification procedures and methods of qualification testing and related documentation. (P.A.)

  2. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Oliver [European Commission, Joint Research Centre (JRC), Petten (Netherlands). Institute for Energy and Transport (IET); Martin, Etienne [EDF, St Denis (France). Direction Production Ingenierie; Booler, Russ [AMEC Clean Energy Europe, Warrington (United Kingdom); Zetterwall, Tommy [Swedish Qualification Centre, Taeby (Sweden); Walker, Tony [Rolls-Royce Submarines, Derby (United Kingdom)

    2014-10-15

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8{sup th} technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  3. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    International Nuclear Information System (INIS)

    Martin, Oliver; Martin, Etienne; Zetterwall, Tommy; Walker, Tony

    2014-01-01

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8 th technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  4. Software qualification in safety applications

    International Nuclear Information System (INIS)

    Lawrence, J.D.

    2000-01-01

    The developers of safety-critical instrumentation and control systems must qualify the design of the components used, including the software in the embedded computer systems, in order to ensure that the component can be trusted to perform its safety function under the full range of operating conditions. There are well known ways to qualify analog systems using the facts that: (1) they are built from standard modules with known properties; (2) design documents are available and described in a well understood language; (3) the performance of the component is constrained by physics; and (4) physics models exist to predict the performance. These properties are not generally available for qualifying software, and one must fall back on extensive testing and qualification of the design process. Neither of these is completely satisfactory. The research reported here is exploring an alternative approach that is intended to permit qualification for an important subset of instrumentation software. The research goal is to determine if a combination of static analysis and limited testing can be used to qualify a class of simple, but practical, computer-based instrumentation components for safety application. These components are of roughly the complexity of a motion detector alarm controller. This goal is accomplished by identifying design constraints that enable meaningful analysis and testing. Once such design constraints are identified, digital systems can be designed to allow for analysis and testing, or existing systems may be tested for conformance to the design constraints as a first step in a qualification process. This will considerably reduce the cost and monetary risk involved in qualifying commercial components for safety-critical service

  5. 75 FR 8731 - Proposed Appointment to the National Indian Gaming Commission

    Science.gov (United States)

    2010-02-25

    ... National Indian Gaming Commission ACTION: Notice. SUMMARY: The Indian Gaming Regulatory Act provides for a three-person National Indian Gaming Commission. One member, the chairman, is appointed by the President... as an associate member of the National Indian Gaming Commission for a term of 3 years. DATES...

  6. 12 CFR 509.101 - Appointment of Office of Financial Institution Adjudication.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Appointment of Office of Financial Institution... Office of Financial Institution Adjudication. Unless otherwise directed by the Office, all hearings under... direction of the Office of Financial Institution Adjudication, 1700 G Street NW., Washington, DC 20552. ...

  7. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  8. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    The overall training system and the development projects of training the staff of all categories from NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce were the subject of UJD's attention. During 2001 following inspections were carried out on nuclear personnel training: - PP's Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff; - Mochovce NPP: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; - SE-VYZ: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff. Training the staff of the NPP's Bohunice: - The fundamental and periodical theoretical training as sure as the fundamental and periodical simulator training is carried out by the VUJE Training centre in Trnava. - The fundamental practical training in the workplace and training for the change work- rank is carried at Bohunice plant. Training of the staff of the NPP Mochovce: - The fundamental and periodical theoretical training is carried out by the VUJE Training centre in Trnava. The fundamental practical training in the workplace and training for the change work- rank as well as the fundamental and periodical simulator training is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues a certificate on special professional skills of selected staff members of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: 1. Scientific shift manager for start up with the right of manipulation; 2. Shift supervisor; 3. Unit supervisor; 4. Primary circuit operator; 5. Secondary circuit operator; 6. Reactor physicist; 7. Scientific shift manager for start up without the right of manipulation. Examinations of

  9. [Judicial and medical/legal aspects of the responsibility of workers appointed to carry out first aid].

    Science.gov (United States)

    Caprioli, L C; Ciavarella, M; Sacco, A

    2005-01-01

    One of the innovations introduced by law 626/94 [the Italian law on occupational health and safety of workers] is the obligation of the employer to designate workers responsible for first aid. To identify and discuss the duties, the role and the medical and legal responsibility of workers appointed to carry out first aid measures. Analysis of legislation and current practice concerning medical and legal responsibility in first aid procedures. The worker appointed to carry out first aid measures is, by virtue of his appointment, obliged to take action. Therefore, he could commit an illegitimate act both by "acting" and by "omitting" to carry out a duty that is his responsibility. In the first case the worker could be accused of committing an unpremeditated criminal offence when his actions involve negligence, imprudence, inexperience or violation of regulations concerning his duties. A "serious criminal offence" is committed when the most elementary rules of diligence, prudence and skill are violated; the offence is "slight" when negligence, imprudence or inexperience are involved in particularly complex situations. The reference parameter for inexperience is not a first aid volunteer, nor a member of the public, but a worker designated to carry out first aid possessing "average" attitudes, training and ability. Briefly, a guilty error by the appointed worker consists of the following: i) the professional conduct of the operator was clearly wrong, serious and unjustifiable; ii) the operator clearly omitted doing his/her duty; iii) the consequence of the error is physical personal damage. The observations made clearly illustrate the delicacy of the tasks of the worker appointed to carry out first aid measures. Essential elements for minimizing wrong and/or negligent conduct are appropriate choice of the designated workers and their adequate training.

  10. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  11. An analysis of the qualification criteria for small radioactive material shipping packages

    International Nuclear Information System (INIS)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described

  12. An analysis of the qualification criteria for small radioactive material shipping packages

    Energy Technology Data Exchange (ETDEWEB)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described.

  13. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  14. The qualification of electrical components and instrumentations relevant to safety

    International Nuclear Information System (INIS)

    Zambardi, F.

    1989-03-01

    Systems and components relevant to safety of nuclear power plants must maintain their functional integrity in order to assure accident prevention and mitigation. Redundancy is utilized against random failures, nevertheless care must be taken to avoid common failures in redundant components. Main sources of degradation and common cause failures consist in the aging effects and in the changes of environmental conditions which occur during the plant life and the postulated accidents. These causes of degradation are expected to be especially significant for instrumentation and electrical equipment, which can have a primary role in safety systems. The qualification is the methodology by which component safety requirements can be met against the above mentioned causes of degradation. In this report the connection between the possible, plant conditions and the resulting degradation effects on components is preliminarily addressed. A general characterization of the qualification is then presented. Basis, methods and peculiar aspects are discussed and the qualification by testing is taken into special account. Technical and organizational aspects related to a plant qualification program are also focused. The report ends with a look to the most significant research and development activities. (author)

  15. Biomarkers as drug development tools: discovery, validation, qualification and use.

    Science.gov (United States)

    Kraus, Virginia B

    2018-06-01

    The 21st Century Cures Act, approved in the USA in December 2016, has encouraged the establishment of the national Precision Medicine Initiative and the augmentation of efforts to address disease prevention, diagnosis and treatment on the basis of a molecular understanding of disease. The Act adopts into law the formal process, developed by the FDA, of qualification of drug development tools, including biomarkers and clinical outcome assessments, to increase the efficiency of clinical trials and encourage an era of molecular medicine. The FDA and European Medicines Agency (EMA) have developed similar processes for the qualification of biomarkers intended for use as companion diagnostics or for development and regulatory approval of a drug or therapeutic. Biomarkers that are used exclusively for the diagnosis, monitoring or stratification of patients in clinical trials are not subject to regulatory approval, although their qualification can facilitate the conduct of a trial. In this Review, the salient features of biomarker discovery, analytical validation, clinical qualification and utilization are described in order to provide an understanding of the process of biomarker development and, through this understanding, convey an appreciation of their potential advantages and limitations.

  16. Challenges of equipment qualification using today`s standards with emphasis on a class 1E motor program

    Energy Technology Data Exchange (ETDEWEB)

    Deaton, K.

    1995-02-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed.

  17. The new lattice code Paragon and its qualification for PWR core applications

    International Nuclear Information System (INIS)

    Ouisloumen, M.; Huria, H.C.; Mayhue, L.T.; Smith, R.M.; Kichty, M.J.; Matsumoto, H.; Tahara, Y.

    2003-01-01

    Paragon is a new two-dimensional transport code based on collision probability with interface current method and written entirely in Fortran 90/95. The qualification of Paragon has been completed and the results are very good. This qualification included a number of critical experiments. Comparisons to the Monte Carlo code MCNP for a wide variety of PWR assembly lattice types were also performed. In addition, Paragon-based core simulator models have been compared against PWR plant startup and operational data for a large number of plants. Some results of these calculations and also comparisons against models developed with a licensed Westinghouse lattice code, Phoenix-P, are presented. The qualification described in this paper provided the basis for the qualification of Paragon both as a validated transport code and as the nuclear data source for core simulator codes

  18. 1E Qualification of Electrical Equipment - Requirement for Safety Nuclear Power Plants

    International Nuclear Information System (INIS)

    Geambasu, C.; Segarceanu, D.; Albu, J.

    2002-01-01

    The paper presents the qualification methods of the safety related equipment according to the safety class 1E. There are presented the qualification principles, procedure and documents, emphasis being laid on the qualification approach by type tests. This approach assumes the equipment test under both normal and accident conditions (design basis events) simulating the operational conditions and covers the largest part of electrical equipment from a nuclear power plant.The safety related equipment is to be qualified is subjected to a sequential test that will be detailed in the paper. (author)

  19. Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

    Science.gov (United States)

    Ramesham, Rajeshuni; Amaro, Luis R.; Brown, Paula R.; Usiskin, Robert; Prater, Jack L.

    2013-01-01

    A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

  20. 78 FR 18363 - Proposed Appointment to the National Indian Gaming Commission

    Science.gov (United States)

    2013-03-26

    ... Gaming Commission AGENCY: Office of the Secretary, Interior. ACTION: Notice. SUMMARY: Before appointing a member to the National Indian Gaming Commission, the Secretary must provide public notice and allow a... member of the National Indian Gaming Commission for a term of 3 years. DATES: Comments must be received...

  1. Leaving school without qualifications and mental health problems to age 30.

    Science.gov (United States)

    Fergusson, David M; McLeod, Geraldine F H; Horwood, L John

    2015-03-01

    To examine the associations between leaving school without qualifications and subsequent mental health to age 30, using data gathered over the course of a 30-year longitudinal study. Data were gathered over the course of a 30-year study (Christchurch Health and Development Study) of a birth cohort of 1265 children, born in Christchurch in 1977. This cohort has been studied on 22 occasions from birth to age 30. As part of this study, information was gathered on: (a) school leaving qualifications, (b) mental health problems from 18 to 30; and (c) prospectively assessed childhood and adolescent factors including: child and family background; family violence and child abuse; and adolescent mental health problems. Leaving school without qualifications was associated with increased risks of subsequent: major depression (OR = 1.37 at 95 % CI 1.05-1.78, p = 0.019); anxiety disorder (OR = 1.99 at 95 % CI 1.55-2.57, p mental health problems) reduced these associations substantially and to the point of statistical non-significance. The findings of this study suggest that there was no direct causal association between leaving school without qualifications and subsequent mental health problems. Associations were explained by the linkages between leaving school without qualifications and: child and family social background; and mental health around the point of school leaving.

  2. Forced Attention to Specific Applicant Qualifications: Impact on Physical Attractiveness and Sex of Applicant Biases.

    Science.gov (United States)

    Cann, Arnie; And Others

    1981-01-01

    Undergraduates evaluated the qualifications of an attractive, average, or unattractive male or female applicant. Ratings of specific qualifications preceded or followed an overall and hiring decision rating. The order variable influenced ratings of specific qualifications but not the overall or hiring decision. Male and attractive applicants were…

  3. The reason for appointing more women to top positions

    OpenAIRE

    Hansson, Martina; Kalantari, Leila

    2015-01-01

    Objective: Our main objective is to identify why the executive management positions of most companies in Europe are not moderately genders diverse. Within this objective we study the pattern of gender representation and diversity in a specific company (named Company A) and investigate theoretically why more women should be appointed to the top positions. Research and practical implications: This thesis contributes to a better understanding of the reason behind not having moderately gender div...

  4. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  5. Qualification Procedures of the CMS Pixel Barrel Modules

    CERN Document Server

    Starodumov, A; Horisberger, R.; Kastli, H.Chr.; Kotlinski, D.; Langenegger, U.; Meier, B.; Rohe, T.; Trueb, P.

    2006-01-01

    The CMS pixel barrel system will consist of three layers built of about 800 modules. One module contains 66560 readout channels and the full pixel barrel system about 48 million channels. It is mandatory to test each channel for functionality, noise level, trimming mechanism, and bump bonding quality. Different methods to determine the bump bonding yield with electrical measurements have been developed. Measurements of several operational parameters are also included in the qualification procedure. Among them are pixel noise, gains and pedestals. Test and qualification procedures of the pixel barrel modules are described and some results are presented.

  6. Qualification and testing of CT systems

    DEFF Research Database (Denmark)

    Bartscher, Markus; Neuschaefer-Rube, Ulrich; Illemann, Jens

    2018-01-01

    This chapter focuses on system verification and conformance to specifications. System qualification is carried out to ensure that the system and itscomponents achieve the best performance—usually corresponding to the specificationsmade by the manufacturer. Acceptance and reverification testing ar...

  7. New Editors Appointed for Water Resources Research

    Science.gov (United States)

    2009-03-01

    Praveen Kumar (University of Illinois at Urbana-Champaign), the newly appointed editor in chief of Water Resources Research (WRR), heads the new team of editors for the journal. The other editors are Tom Torgersen (University of Connecticut, Groton), who continues his editorship; Tissa Illangasekare (Colorado School of Mines, Golden); Graham Sander (Loughborough University, Loughborough, UK); and John Selker (Oregon State University, Corvallis). Hoshin Gupta (University of Arizona, Tucson) will join WRR at the end of 2009. The new editors will begin receiving submissions immediately. The incoming editorial board thanks outgoing editors Marc Parlange, Brian Berkowitz, Amilcare Porporato, and Scott Tyler, all of whom will assist during the transition.

  8. 15 CFR 40.2 - Qualifications.

    Science.gov (United States)

    2010-01-01

    ... Qualifications. (a) To be eligible for a training grant at the Bureau of the Census the applicant must be: (1) A... training programs. (2) Able to speak, read, write, and understand the English language. (3) Sponsored by his government either directly with the United States or through a public international agency. (4...

  9. Some remarks regarding the procedure of the appointment of the secretary general of the United Nations

    OpenAIRE

    Novaković Marko

    2016-01-01

    Appointing Secretary-General is a process that has always been enshrined in secrecy. In 2016, due to reforms in the appointment process instigated by the president of the Security Council Mogens Lykketoft, more inclusion and transparency have been achieved, with the non-state actors being much more involved in the process. In the procedure itself, first five straw polls suggested that Antonio Guterres will be the new Secretary-General and this proved to be truth. Will this more transparent sy...

  10. Extension Education Symposium: Getting the Most Out of Your Extension Appointment and Still Having a Life

    OpenAIRE

    Powers, W.; Cockett, Noelle E.; Lardy, Gregory P.

    2017-01-01

    Managing the demands of an academic appointment in extension can be a challenging task. Demands from constituent groups, expectations of supervisors, and rigors of promotion and tenure processes can create pressures that young faculty did not expect. Throw in spousal and family duties and you have created a situation that many will find hard to navigate. However, there are ways to cope and, even better news, there are ways to excel in meeting the demands of an academic appointment and enjoyin...

  11. Evaluation and qualification of novel control techniques with safety requirements

    International Nuclear Information System (INIS)

    Gossner, S.; Wach, D.

    1985-01-01

    The paper discusses the questions related to the assessment and qualification of new I and C-systems. The tasks of nuclear power plant I and Cs as well as the efficiency of the new techniques are reflected. Problems with application of new I and Cs and the state of application in Germany and abroad are addressed. Starting from the essential differencies between conventional and new I and C-systems it is evaluated, if and in which way existing safety requirements can be met and to what extent new requirements need to be formulated. An overall concept has to be developed comprising the definition of graded requirement profiles for design and qualification. Associated qualification procedures and tools have to be adapted, developed and tuned upon each other. (orig./HP) [de

  12. Qualification of conditioning process

    International Nuclear Information System (INIS)

    Wolf, J.

    1989-01-01

    A conditioning process is qualified by the PTB if the execution of pre-treatment and conditioning occurs so that a safe and orderly final storage of the products and waste containers produced can be assumed. All the relevant operating conditions for the plant are laid down by the producer/conditioner of the waste in a handbook. The elements of product inspection by process qualification are shown in tabular form. (DG) [de

  13. Application of the transtheoretical model of behaviour change for identifying older clients' readiness for hearing rehabilitation during history-taking in audiology appointments.

    Science.gov (United States)

    Ekberg, Katie; Grenness, Caitlin; Hickson, Louise

    2016-07-01

    The transtheoretical model (TTM) of behaviour change focuses on clients' readiness for adopting new health behaviours. This study explores how clients' readiness for change can be identified through their interactions with audiologists during history-taking in initial appointments; and whether clients' readiness has consequences for the rehabilitation decisions they make within the initial appointment. Conversation analysis (CA) was used to examine video-recorded initial audiology appointments with older adults with hearing impairment. The data corpus involved 62 recorded appointments with 26 audiologists and their older adult clients (aged 55+ years). Companions were present in 17 appointments. Clients' readiness for change could be observed through their interaction with the audiologist. Analysis demonstrated that the way clients described their hearing in the history-taking phase had systematic consequences for how they responded to rehabilitation recommendations (in particular, hearing aids) in the management phase of the appointment. In particular, clients identified as being in a pre-contemplation stage-of-change were more likely to display resistance to a recommendation of hearing aids (80% declined). The transtheoretical model of behaviour change can be useful for helping audiologists individualize management planning to be congruent with individual clients' needs, attitudes, desires, and psychological readiness for action in order to optimize clients' hearing outcomes.

  14. Visas and qualifications: Syrian refugees in Brazil

    Directory of Open Access Journals (Sweden)

    Gilberto M A Rodrigues

    2017-10-01

    Full Text Available Brazil’s humanitarian visa programme for Syrian refugees and its efforts to recognise their qualifications could offer lessons for refugee protection and integration across the region.

  15. Technical basis for environmental qualification of computer-based safety systems in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Tanaka, T.J.; Antonescu, C.E.

    1997-01-01

    This paper summarizes the results of research sponsored by the US Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. This research was conducted by the Oak Ridge National Laboratory (ORNL) and Sandia National Laboratories (SNL). ORNL investigated potential failure modes and vulnerabilities of microprocessor-based technologies to environmental stressors, including electromagnetic/radio-frequency interference, temperature, humidity, and smoke exposure. An experimental digital safety channel (EDSC) was constructed for the tests. SNL performed smoke exposure tests on digital components and circuit boards to determine failure mechanisms and the effect of different packaging techniques on smoke susceptibility. These studies are expected to provide recommendations for environmental qualification of digital safety systems by addressing the following: (1) adequacy of the present preferred test methods for qualification of digital I and C systems; (2) preferred standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging in qualification testing for equipment that is to be located in mild environments; and (5) determination of an appropriate approach to address smoke in a qualification program

  16. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...

  17. Round table discussion " Development of qualification framework in meteorology (TEMPUS QUALIMET)"

    Science.gov (United States)

    Bashmakova, I.; Belotserkovsky, A.; Karlin, L.; Petrosyan, A.; Serditova, N.; Zilitinkevich, S.

    2010-09-01

    The international consortium has started implementing a project aimed at the development of unified framework of qualifications in meteorology (QualiMet), setting a system of recognition and award of qualifications up to Doctoral level based on standards of knowledge, skill and competence acquired by learners is underway. The QualiMet has the following specific objectives: 1. To develop standards of knowledge, skills and competence for all qualifications up to Doctoral level needed in all possible occupations meteorology learner can undertake, by July 2011 2. To develop reciprocally recognized rubrics, criteria, methods and tools for assessing the compliance with the developed standards (quality assurance), by July 2012 3. To set the network of Centers of Excellence as the primary designer of sample education programs and learning experiences, both in brick-and-mortar and distant setting of delivery, leading to achievement of the developed standards, by December 2012 4. To set a system of mutual international recognition and award of qualifications in meteorology based on the developed procedures and establishment of self-regulatory public organization, by December 2012 The main beneficiaries of the project are: 1. Meteorology learners from the consortium countries. They will be able to make informed decisions about available qualification choices and progression options and provided an opportunity for students and graduates to participate in the system of international continuous education. 2. Meteorology employers from the consortium countries, They will be able to specify the level of knowledge, skill and competence required for occupational roles, evaluate qualifications presented, connect training and development with business needs. 3. Students and academic staff of all the consortium members, who will gain the increased mobility and exchange the fluxes of culturally and institutionally diversified lecturers and qualified specialists

  18. Water bath and air bath calorimeter qualification for measuring 3013 containers of plutonium oxide at the Hanford Plutonium Finishing Plant (PFP)

    International Nuclear Information System (INIS)

    WELSH, T.L.

    2003-01-01

    The purpose of this paper is to present qualification data generated from water and air-bath calorimeters measuring radioactive decay heat from plutonium oxide in DOE STD-3013-2000 (3013) containers at the Hanford Plutonium Finishing Plant (PFP). Published data concerning air and water bath calorimeters and especially 3013-qualified calorimeters is minimal at best. This paper will address the data from the measurement/qualification test plan, the heat standards used, and the calorimeter precision and accuracy results. The 3013 package is physically larger than earlier plutonium oxide storage containers, thereby necessitating a larger measurement chamber. To accommodate the measurements of the 3013 containers at PFP, Los Alamos National Laboratory (LANL) supplied a water bath dual-chambered unit and the Savannah River Technology Center (SRTC) provided two air-bath calorimeters. Both types of Calorimeters were installed in the analytical laboratory at PFP. The larger 3013 containers presented a new set of potential measurement problems: longer counting times, heat conductivity through a much larger container mass and wall thickness, and larger amounts of copper shot to assist sample thermal conductivity. These potential problems were addressed and included in the measurement/qualification test plan

  19. Who Can Be President of the United States?: Candidate Hillary Clinton and the Problem of Statutory Qualifications

    Directory of Open Access Journals (Sweden)

    Tillman Seth Barrett

    2016-04-01

    Full Text Available Qualifications for public office restrict democratic choice, but such restrictions have a long pedigree in many jurisdictions. For example, the U.S. Constitution sets out qualifications for elected federal officials: i.e., Representative, Senator, President, and Vice President. Qualifications for those positions include provisions relating to age, citizenship, and residence. It has been long debated whether these textual qualifications are exclusive (i.e., floors and ceilings or whether they are merely floors, which can be supplemented by additional qualifications imposed by Congress or by the States.

  20. Development Of A Macro-Batch Qualification Strategy For The Hanford Tank Waste Treatment And Immobilization Plant

    International Nuclear Information System (INIS)

    Herman, Connie C.

    2013-01-01

    The Savannah River National Laboratory (SRNL) has evaluated the existing waste feed qualification strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) based on experience from the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) waste qualification program. The current waste qualification programs for each of the sites are discussed in the report to provide a baseline for comparison. Recommendations on strategies are then provided that could be implemented at Hanford based on the successful Macrobatch qualification strategy utilized at SRS to reduce the risk of processing upsets or the production of a staged waste campaign that does not meet the processing requirements of the WTP. Considerations included the baseline WTP process, as well as options involving Direct High Level Waste (HLW) and Low Activity Waste (LAW) processing, and the potential use of a Tank Waste Characterization and Staging Facility (TWCSF). The main objectives of the Hanford waste feed qualification program are to demonstrate compliance with the Waste Acceptance Criteria (WAC), determine waste processability, and demonstrate unit operations at a laboratory scale. Risks to acceptability and successful implementation of this program, as compared to the DWPF Macro-Batch qualification strategy, include: Limitations of mixing/blending capability of the Hanford Tank Farm; The complexity of unit operations (i.e., multiple chemical and mechanical separations processes) involved in the WTP pretreatment qualification process; The need to account for effects of blending of LAW and HLW streams, as well as a recycle stream, within the PT unit operations; and The reliance on only a single set of unit operations demonstrations with the radioactive qualification sample. This later limitation is further complicated because of the 180-day completion requirement for all of the necessary waste feed qualification steps. The primary recommendations/changes include the

  1. URGENT AND LAG PSYCHOPHYSIOLOGICAL EFFECTS NEUROFEEDBACK IN SPORTSMEN OF HIGH QUALIFICATION

    Directory of Open Access Journals (Sweden)

    O. V. Kaigorodtseva

    2013-01-01

    Full Text Available The article provides a comparative analysis of the psychophysiological state of sportsmen of high qualification within one year after the course neurofeedback. These data demonstrated that high qualification sportsmen physiological effects of training persist throughout the year and depend on the ability to arbitrarily increase the power of the alpha rhythm of the brain.

  2. Sports Direct to appoint full-time nurse after inquiry into employment practices.

    Science.gov (United States)

    2016-09-14

    Retailer Sports Direct is to appoint a full-time nurse at its vast warehouse in response to concerns about health and safety. The firm was the subject of a House of Commons business, innovation and skills select committee inquiry into its employment practices.

  3. A manual for pyrotechnic design, development and qualification

    Science.gov (United States)

    Bement, Laurence J.; Schimmel, Morry L.

    1995-01-01

    Although pyrotechnic devices have been singularly responsible for the success of many of the critical mechanical functions in aerospace programs for over 30 years, ground and in-flight failures continue to occur. Subsequent investigations reveal that little or no quantitative information is available on measuring the effects on performance of system variables or on determining functional margins. Pyrotechnics are considered to be readily available and, therefore, can be managed by any subsystem in which they are applied, such as structure, propulsion, electric power, or life support. The primary purpose of this manual is to alter the concept that the use of pyrotechnics is an art and refute 'justifications' that applications do not need to be understood by providing information on pyrotechnic design, development, and qualification on an engineering basis. Included are approaches to demonstrate functional reliability with less than 10 units, how to manage pyrotechnic-unique requirements, and methods to assure that the system is properly assembled and will perform the required tasks.

  4. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  5. Factors related to missing and rescheduling pharmaceutical care appointments by aged outpatients in a Brazilian public health setting

    Directory of Open Access Journals (Sweden)

    Thiago Vinícius Nadaleto Didone

    2015-12-01

    Full Text Available Objectives: To uncover reasons why patients missed pharmaceutical care (PC appointments, identify predictive factors to miss at least one appointment and to reschedule after a miss, and compare the rescheduling behavior of patients receiving different types of PC. Methods: All elderly patients who had at least one scheduled appointment in the PC service of a health setting of São Paulo city, Brazil, from January to December/2011 were included. Chi-square analysis compared categorical data between groups; multivariate logistic regression models predicted attendance and rescheduling behavior. Results: We identified 421 patients, being 221 (52.5% non-attenders. Forgetting the appointment was the most common patient-related reason (56.3%. Illiteracy was a risk factor to be a non-attender [OR(95%CI=2.27(1.17:4.40, p=0.015]. Patients having previous knowledge of the pharmacist presented more chance to rescheduled an appointment after the first miss compared to those who had not [OR(95%CI=3.57(1.90:6.71, p<0.001]. Further, non-attenders who had knowledge of the pharmacist and received Medication Review with Follow-up rescheduled more than the ones receiving other types of PC (p=0.035. Conclusion: Illiteracy predicted non-attendance in PC to aged outpatients and forgetfulness was the main reason for that. The previous acquaintance of the pharmacist and the provision of pharmaceotherapeutic follow-up explained the rescheduling behavior, which indicates the establishment of a patient-centered patient-pharmacist relationship plays a pivotal role in the continuity of the PC.

  6. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    International Nuclear Information System (INIS)

    Mitteau, Raphaël; Eaton, R.; Perez, G.; Zacchia, F.; Banetta, S.; Bellin, B.; Gervash, A.; Glazunov, D.; Chen, J.

    2015-01-01

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  7. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    Energy Technology Data Exchange (ETDEWEB)

    Mitteau, Raphaël, E-mail: Raphael.mitteau@iter.org [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Eaton, R.; Perez, G. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Zacchia, F.; Banetta, S.; Bellin, B. [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Gervash, A.; Glazunov, D. [Efremov Research Institute, 189631 St. Petersburg (Russian Federation); Chen, J. [Southwestern Institute of Physics, Huangjing Road, Chengdu 610225 (China)

    2015-10-15

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  8. Design requirements, criteria and methods for seismic qualification of CANDU power plants

    International Nuclear Information System (INIS)

    Singh, N.; Duff, C.G.

    1979-10-01

    This report describes the requirements and criteria for the seismic design and qualification of systems and equipment in CANDU nuclear power plants. Acceptable methods and techniques for seismic qualification of CANDU nuclear power plants to mitigate the effects or the consequences of earthquakes are also described. (auth)

  9. Qualification of organizations for independent technical supervision

    International Nuclear Information System (INIS)

    1981-04-01

    The requirements are established on trial for the qualification of an organization as an independent technical supervision organization in nuclear facilities, in activities related with quality assurance programs. (I.C.R.) [pt

  10. The HTR modular power reactor system. Qualification of fuel elements and materials

    International Nuclear Information System (INIS)

    Heidenreich, U.; Breitling, H.; Nieder, R.; Ohly, W.; Mittenkuehler, A.; Ragoss, H.; Seehafer, H.J.; Wirtz, K.; Serafin, N.

    1989-01-01

    For further development of the HTR modular power reactor system (HTR-M-KW), the project activities for 'Qualification of fuel elements and materials' reported here cover the work for specifying the qualifications to be met by metallic and ceramic materials, taking into account the design-based requirements and the engineered safety requirements. The fission product retention data determined for the HTR modular reactor fuel elements could be better confirmed by evaluation of the experiments, and have been verified by various calculation methods for different operating conditions. The qualification of components was verified by strength analyses including a benchmark calculation for specified normal operation and emergencies; the results show a convenient behaviour of the components and their materials. In addition, a fuel element burnup measuring system was designed that applies Cs-137 gamma spectroscopy; its feasibility was checked by appropriate analyses, and qualification work is in progress. The installation of a prototype measurement system is the task for project No. 03 IAT 211. (orig.) [de

  11. mHealth Clinic Appointment PC Tablet: Implementation, Challenges and Solutions

    Science.gov (United States)

    Smith, Carol E.; Spaulding, Ryan; Piamjariyakul, Ubolrat; Werkowitch, Marilyn; Yadrich, Donna Macan; Hooper, Dedrick; Moore, Tyson; Gilroy, Richard

    2015-01-01

    Background Patients requiring daily intravenous (IV) home parenteral nutrition (HPN) would benefit from in-home professional observation to improve self-care, to assess, detect and prevent serious complications. Aims The study aims are to assess the viability and utility of conducting mobile healthcare (mHealth) videoconference assessments with patients managing lifelong daily 12-hour IV nutrition infusions in their homes. The challenges and solutions to implementing mobile personal computer (PC) tablet based clinic appointments are described. Methods A wireless Apple iPad Mini™ mobile touch-screen tablet computer with 5 mega-pixel camera was loaned to patients. Each tablet had Polycom RealPresence software and a fourth generation (4G) mobile telecommunications data plan. These supported audio-visual mobile videoconferencing encrypted connections between health professionals in their offices and HPN patients and their family members in their homes. Patients’ and professionals’ evaluations of their mHealth clinic experiences are collected. Results Patients (mean age = 41.9, SD = 2.8 years) had been prescribed 12-hour home parenteral nutrition (HPN) infusions daily due short bowel disorders. Patients had been on HPN from 1 to 10 years (M=4, SD=3.6). Evaluation of clinic appointments revealed that 100% of the patients (n=45) and the professionals (n=6) indicated that they can clearly hear and easily see one another. The mHealth audio-visual interactions were highly rated by patients and family members. Professionals highly rated their ability to obtain a medical history and visual inspection of patients. Several challenges were identified and recommendations for resolutions are described. Discussion All patients and professionals highly rated the iPad mHealth clinic appointments for convenience and ease of communicating between homes and offices. An important challenge for all mHealth visits is the clinical professional’s ability to make clinically accurate

  12. Treatment dropout and missed appointments among adults with attention-deficit/hyperactivity disorder: associations with patient- and disorder-related factors.

    Science.gov (United States)

    Soendergaard, Helle M; Thomsen, Per H; Pedersen, Pernille; Pedersen, Erik; Poulsen, Agnethe E; Nielsen, Jette M; Winther, Lars; Henriksen, Anne; Rungoe, Berit; Soegaard, Hans J

    2016-02-01

    Knowledge of factors associated with treatment dropout and missed appointments in adults with attention-deficit/hyperactivity disorder (ADHD) is very limited. On the basis of proposed hypotheses that past behavior patterns are more predictive of current behaviors of treatment dropout and missed appointments than are sociodemographic and clinical characteristics, we examined the associations of sociodemographic variables, clinical variables, risk-taking behavior, educational and occupational instability, and behaviors during mandatory schooling with the primary outcome measures of treatment dropout and missed appointments. In a naturalistic cohort study of 151 adult outpatients with ADHD initiating assessment in a Danish ADHD unit from September 1, 2010, to September 1, 2011, the Adult ADHD Self-Report Scale v1.1 symptom checklist (ASRS) and a thorough clinical interview were used to assess ADHD according to DSM-IV-TR criteria. Stepwise logistic regression analysis was used to estimate reported associations. A total of 27% of patients dropped out of treatment and a total of 42% had ≥ 3 missed appointments during treatment. Mood and anxiety disorders significantly lowered the odds of treatment dropout (odds ratio [OR] = 0.18; 95% confidence interval [CI], 0.05-0.65), whereas having started but not completed 2 or more educational programs apart from mandatory schooling significantly increased the odds of dropout (OR = 3.01; 95% CI, 1.32-6.89). Variables significantly associated with most missed appointments were low educational level (OR = 2.19; 95% CI, 1.12-4.31), 3 or more employments of less than 3 months' duration (OR = 2.86; 95% CI, 1.30-6.28), and having skipped class often/very often during mandatory schooling (OR = 2.65; 95% CI, 1.29-5.43). Additionally, the predominantly inattentive ADHD (ADHD-I) subtype lowered the odds of missed appointments (OR = 0.17; 95% CI, 0.05-0.62). Our results suggest that past behavior in terms of highest dropout rates in the

  13. PR Faculty: What Are Their Qualifications?

    Science.gov (United States)

    Johnson, Thomas B.; Rabin, Kenneth

    1977-01-01

    Discusses a study designed to determine existing trends in the backgrounds and qualifications of public relations instructors and how these might affect public relations education. Available from: Public Relations Review, Ray Hiebert, Dean, College of Journalism, University of Maryland, College Park, MD 20742. (MH)

  14. Relationship Between Teachers\\' Qualification And Students ...

    African Journals Online (AJOL)

    It has been observed that students\\' performance in technical subjects is very poor. Coupled with this problem is that of lack of qualified technical teachers. This study determines the relationship between teachers\\' qualification and students\\' performance in technical subjects in selected schools in northern Nigeria.

  15. 42 CFR 485.705 - Personnel qualifications.

    Science.gov (United States)

    2010-10-01

    ... Physical Therapy and Speech-Language Pathology Services § 485.705 Personnel qualifications. (a) General... involved in the furnishing of outpatient physical therapy, occupational therapy, and speech-language...) of the Act and the requirements in part 484 of this chapter. (2) For a speech-language pathologist...

  16. 5 CFR 315.705 - Employees serving under transitional or veterans recruitment appointments.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Employees serving under transitional or veterans recruitment appointments. 315.705 Section 315.705 Administrative Personnel OFFICE OF PERSONNEL...-Conditional Employment From Other Types of Employment § 315.705 Employees serving under transitional or...

  17. A strategy for implementation of experience based seismic equipment qualification in IEEE and ASME industry standards

    International Nuclear Information System (INIS)

    Adams, T.M.

    1996-01-01

    In the past 20 years, extensive data on the performance of mechanical and electric equipment during actual strong motion earthquakes and seismic qualification tests has been accumulated. Recognizing that an experience based approach provides a technically sound and cost effective method for the seismic qualification of some or certain equipment, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment established a Special Working Group to investigate the incorporation of experienced based methods into the industry consensus codes and standards currently used in the seismic qualification of Seismic Category Nuclear Power Plant equipment. This paper presents the strategy (course of action) which was developed by the Special Working Group for meeting this objective of incorporation of experience based seismic qualification standards used in the design and seismic qualification of seismic category nuclear power plant equipment. This strategy was recommended to both chartering organizations, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment for their consideration and implementation. The status of the review and implementation of the Special Working Group's recommended strategy by the sponsoring organization is also discussed

  18. Professional Exam as a Tool for Forming the Trajectory of Improving the Qualification of an Employee

    Directory of Open Access Journals (Sweden)

    Egorov I.

    2017-11-01

    Full Text Available The results of the study of the provisions of the Federal Law "On Independent Qualification Assessment", of an explanatory note to the draft of the Federal Law "On Independent Qualification Assessment", of a number of other normative legal acts regarding the objectives and procedure for the implementation of an independent assessment of qualifications, including a professional exam, the use of its results, are described. On the basis of the analysis of a number of research works on the improvement of the qualifications of employees and the development of the system of continuous education, conclusions were drawn on an objective assessment by the legislator of a permanent increase in the requirements for the qualification of workers and the consequent need for continuous improvement of their qualifications, including the development of a continuous education system. Proposals have been formulated to introduce amendments to the legislation of the Russian Federation aimed at forming a recommendation for an employee to select existing resources for the self-alignment of an individual set of competences with a personalized offer of support options from the educational and professional structures - the trajectory of improving the qualification of an employee..

  19. "EU-on-Demand": Developing National Qualifications Frameworks in a Multi-Level Context

    Science.gov (United States)

    Elken, Mari

    2016-01-01

    The development of comprehensive national qualifications frameworks (NQFs) across Europe has been sparked by the introduction of the European Qualifications Framework (EQF) in 2008. Taking an institutional perspective, this article examines the development of NQFs in three countries, in light of developments that have taken place at the European…

  20. Is a PhD a necessary requirement for lecturers in a`Medical School ...

    African Journals Online (AJOL)

    user

    2005-04-01

    Apr 1, 2005 ... universities did not require a PhD or equivalent qualifications as a minimum requirement for appointment to the ... report of 2002, Common-wealth year books. 1997/8 and 2002, ..... threatens to erode teaching standards and.

  1. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  2. 77 FR 63872 - Senior Executive Service; Appointment of Members to the Performance Review Board

    Science.gov (United States)

    2012-10-17

    ... Resources--Kim L.H. Green. Rotating Membership ASP Kathleen E. Franks, Director, Office of Regulatory and... OLMS Stephen J. Willertz, Director, Office of Enforcement and International Union Audits--appointment...

  3. STEM Leadership Qualification: Tomorrow's Leaders Today

    Science.gov (United States)

    Williams, Chris

    2009-01-01

    This article features the Science, Technology, Engineering and Mathematics (STEM) Leadership Qualification programme, developed by the Centre for Science Education (CSE) at Sheffield Hallam University in collaboration with Edexcel, which sets out to develop leadership skills and capabilities through contexts in STEM. With six units to complete…

  4. 5 CFR 330.208 - Qualification requirements.

    Science.gov (United States)

    2010-01-01

    ... perform the duties and responsibilities of the position. (c) The sex of an individual may not be... qualified for a position if he or she: (1) Meets OPM-established or approved qualification standards and requirements for the position, including any minimum educational requirements, and any selection placement...

  5. Quality Assurance and Qualifications Frameworks: Exchanging Good Practice. ENQA Workshop Report 21

    Science.gov (United States)

    Blomqvist, Carita; Donohoe, Tony; Kelo, Maria; Linde, Karin Jarplid; Llavori, Rafael; Maguire, Bryan; Metz, David; Sanchez, Teresa

    2012-01-01

    The theme of qualifications frameworks and their relation to quality assurance is gaining urgency in the European scene as more and more countries are completing their national qualifications frameworks and quality assurance agencies need to take important decisions on how to implement them. Some of the key features of the qualifications…

  6. 10 CFR 50.120 - Training and qualification of nuclear power plant personnel.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Training and qualification of nuclear power plant... Training and qualification of nuclear power plant personnel. (a) Applicability. The requirements of this... each holder of a combined license issued under part 52 of this chapter for a nuclear power plant of the...

  7. 20 CFR 408.1101 - Can you appoint someone to represent you?

    Science.gov (United States)

    2010-04-01

    ... WORLD WAR II VETERANS Representation of Parties § 408.1101 Can you appoint someone to represent you? (a... clause in paragraph (b), the second sentences in paragraphs (b)(1) and (b)(2), and paragraph (c)(2) do... this part, the rules on representation of parties in §§ 416.1500-416.1505, 416.1507-416.1515 and 416...

  8. 75 FR 44853 - Woodlands Bank, Bluffton, SC; Notice of Appointment of Receiver

    Science.gov (United States)

    2010-07-29

    ... DEPARTMENT OF THE TREASURY Office of Thrift Supervision Woodlands Bank, Bluffton, SC; Notice of... the Home Owners' Loan Act, the Office of Thrift Supervision has duly appointed the Federal Deposit Insurance Corporation as sole Receiver for Woodlands Bank, Bluffton, South Carolina (OTS No. 08464), as of...

  9. 75 FR 45012 - Turnberry Bank, Aventura, FL; Notice of Appointment of Receiver

    Science.gov (United States)

    2010-07-30

    ... DEPARTMENT OF THE TREASURY Office of Thrift Supervision Turnberry Bank, Aventura, FL; Notice of... the Home Owners' Loan Act, the Office of Thrift Supervision has duly appointed the Federal Deposit Insurance Corporation as sole Receiver for Turnberry Bank, Aventura, Florida (OTS No. 08087), on July 16...

  10. Logic qualification of FPGA-based safety-related I and C systems

    International Nuclear Information System (INIS)

    Hayashi, Toshifumi; Oda, Naotaka; Ito, Toshiaki; Miyazaki, Tadashi; Haren, Yasuhiko

    2009-01-01

    We established a logic qualification method for FPGA-Based I and C safety-related use in Nuclear Power Plants Systems. The FPGA is a programmable logic device and has advantages that the programming is rigorous, simple verifiable, and the technology is stable. However, logic qualification of FPGA had been an issue to be solved when it is used in the safety-related systems, because FPGA is relatively new technology for the nuclear power industry. We employed a software-life cycle approach, because its development process is similar to that of conventional computer-based systems. There are some differences between the FPGA-Based systems and the computer-based systems in the implementation and integration of logic. We examined the FPGA logic implementation and integration process to identify any FPGA-Based system specific hazards. The identified hazards are (1) small logic errors, (2) timing errors, (3) logic synthesis errors, (4) place and route errors, and (5) logic embedding errors. We took the appropriate countermeasures to mitigate these hazards, and employed this logic qualification method in the qualification of the Power Range Monitor System for BWR Power Plants. (author)

  11. DATA QUALIFICATION REPORT: DATA QUALIFICATION REPORT FOR 1991 1:1200 TOPOGRAPHIC MAPS FOR USE ON THE YUCCA MOUNTAIN PROJECT

    International Nuclear Information System (INIS)

    Knop, M.F.; Grant, T.A.; Bonisolli, R.W.

    2005-01-01

    This Data Qualification Report (DQR) is prepared in accordance with the provisions of AP-SIII.2Q, Rev. 0, ICN 3, Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data and Data Qualification Plan for 1991 Topographic Maps 1:1200 Scale for use on the Yucca Mountain Project, DQP-WHS-CI-000001, Rev. 00 (BSC 2002a). This DQR presents an evaluation of a set of 90 topographic sheets at 1:1200 scale (and an associated electronic file) that covers an approximate 18 square mile area surrounding the proposed Yucca Mountain Project repository surface facilities location in Midway Valley, Nevada. These maps, that require qualification, are now being used to determine the physical characteristics of watershed sub-areas, interconnecting channels, and drainage channel cross-sections for hydrologic engineering studies of the north portal pad and vicinity. The result of this effort is to qualify one data tracking number (DTN) containing the electronic version of the mapping data. This DTN is: M09906COV98462.000. Coverage: TOP02FTS. The underlying quality assurance (QA) issue associated with these topographic maps is that the maps were originally designated as not for use in the design of items important to safety, waste isolation, and/or of programmatic importance. The maps were therefore generated outside the U.S. Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) QA program. Based on a comparison with corroborating information, this report concludes that the topographic maps are qualified. The comparison found that the mapping was reasonably accurate when compared with other mapping and survey data within the coverage area of the maps. Relative map accuracy was found to be very good and suitable for the hydrologic engineering studies being considered. Absolute accuracy is good but could not be demonstrated to comply with national map accuracy standards. Point locations that require high absolute accuracy should be

  12. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-05-01

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants... entitled ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants'' is temporarily...

  13. A Motor Drive Electronics Assembly for Mars Curiosity Rover: An Example of Assembly Qualification for Extreme Environments

    Science.gov (United States)

    Kolawa, Elizabeth; Chen, Yuan; Mojarradi, Mohammad M.; Tudryn Weber, Carissa

    2013-01-01

    In this paper, the technology development and infusion of the motor drive electronics assembly, along with the technology qualification and space qualification, is described and detailed. The process is an example of the qualification methodology for extreme environmen

  14. QUALIFICATIONS FRAMEWORKS LEADING TO REFORMS IN EAST EUROPEAN EDUCATION

    Directory of Open Access Journals (Sweden)

    Arjen Vos

    2014-01-01

    Full Text Available The paper examines the evolution of qualifications frameworks across Europe. Five years ago, it was not clear if the discussions on national qualification frameworks (NQF in Eastern Europe would lead to the new standards and qualifications development, or initiate the reforms in education and training. Now, there is evidence of more countries using the NQFs to promote a dialogue between the public and private sectors on the expected outcomes of educational process. In some countries, the private sector has even taken the lead in the NQF discussions, being increasingly involved in their implementation. This is a fundamentally new paradigm in education policies and a cornerstone of the demand driven education and training. Each country is following its own patterns while moving to the comparable results. However, this is just the initial stage of NQF implementation. The author regards learning by doing and the local expertise expansion as the key challenges of the coming years. Although the reforms take time, they increasingly tend to become a shared public and private responsibility.

  15. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  16. The first antenatal appointment: An exploratory study of the experiences of women with a diagnosis of mental illness.

    Science.gov (United States)

    Phillips, Louise; Thomas, Dona

    2015-08-01

    to explore and gain insight into the expectations and experiences of women with a pre-existing diagnosis of mental illness, of their first booking appointment; to make recommendations for practice development and collaborative partnership working between healthcare professionals. a qualitative design using semi structured interviews and thematic analysis of the data. QSR NVivo 10 software is used to organise the data into themes. the interviews took place either at the women׳s homes, or within the antenatal service with the consent of the woman and relevant practitioners. twelve participants were selected from one antenatal clinic and one perinatal mental health service. the themes identified within the data included the lack of information prior to the initial midwife booking appointment; the perception of too much information at the initial booking appointment and women not being clear about their mental health needs at this time; a general positivity about disclosing mental illness diagnoses; overall positive thoughts about midwives although some midwives appeared less knowledgeable about bipolar disorder, and perceptions about a lack of joined up working between antenatal and perinatal mental health services. it is recommended that GPs receive adequate training in order to equip them with the skills needed to discuss sensitive issues around perinatal mental illness and the impact on pregnancy and childbirth. Women require more information about their booking appointment, and it would be beneficial for their emotional and physical health needs to be assessed at each follow-up antenatal appointment. Midwives need to be facilitated to receive up-to-date knowledge of antenatal and postnatal mental illness and treatments, and the referral process to perinatal mental health services. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Qualification of the flight-critical AFTI/F-16 digital flight control system. [Advanced Fighter Technology Integration

    Science.gov (United States)

    Mackall, D. A.; Ishmael, S. D.; Regenie, V. A.

    1983-01-01

    Qualification considerations for assuring the safety of a life-critical digital flight control system include four major areas: systems interactions, verification, validation, and configuration control. The AFTI/F-16 design, development, and qualification illustrate these considerations. In this paper, qualification concepts, procedures, and methodologies are discussed and illustrated through specific examples.

  18. Enhancing an appointment diary on a pocket computer for use by people after brain injury.

    Science.gov (United States)

    Wright, P; Rogers, N; Hall, C; Wilson, B; Evans, J; Emslie, H

    2001-12-01

    People with memory loss resulting from brain injury benefit from purpose-designed memory aids such as appointment diaries on pocket computers. The present study explores the effects of extending the range of memory aids and including games. For 2 months, 12 people who had sustained brain injury were loaned a pocket computer containing three purpose-designed memory aids: diary, notebook and to-do list. A month later they were given another computer with the same memory aids but a different method of text entry (physical keyboard or touch-screen keyboard). Machine order was counterbalanced across participants. Assessment was by interviews during the loan periods, rating scales, performance tests and computer log files. All participants could use the memory aids and ten people (83%) found them very useful. Correlations among the three memory aids were not significant, suggesting individual variation in how they were used. Games did not increase use of the memory aids, nor did loan of the preferred pocket computer (with physical keyboard). Significantly more diary entries were made by people who had previously used other memory aids, suggesting that a better understanding of how to use a range of memory aids could benefit some people with brain injury.

  19. Index of Submarine Medical Officer’s Qualification Theses 1944-1974

    Science.gov (United States)

    1976-04-01

    USING HYPOTHERMIA AND HYPERBARIC CXYGENATI 1972-3011 0 A CASE REPO+ HYPOBARIC HYPOXIA ABOARD A SUBMERGED SUBMARINE 1972-0014 THE EFFECTS OF ACUTE HYPOXIA...G009 LEVEL. VENTILATORY DYNAMICS UNDER HYPERBARIC STATES.= SUBMARINE MEDICAL QUALIFICATION THESES U. So NAVAL SJBMARINE MEDICAL CENTER SUBMARINE BASE...CONNECTICUT. 23 OCT 62 StJRL ____________ 1962-0019 WOO3D W.- - ____ VENTILATORY DYNAMICS UNDER HYPERBARIC STATES.= SUBMARINE MEDICAL QUALIFICATION THESES

  20. Development of equipment qualification requirements for NPP instrumentation and control systems

    International Nuclear Information System (INIS)

    Siora, A. A.; Reshetitskij, S. V.; Harybin, A. V.

    2012-01-01

    The main stages of equipment qualification are presented. The aim of the work is to ensure compatibility between Ukrainian and international requirements. A comparison with US NRC requirements has been done. The approach in equipment qualification is presented for the resistance to: irradiation; dust; seismic motion, vibrations and mechanical impact; environmental impact (temperature, humidity, pressure); power supply parameters etc., as well as the technological testing

  1. Qualification of anticorrosive coatings in nuclear vessels

    International Nuclear Information System (INIS)

    Perez Flores, C.

    1985-01-01

    Test qualifications of the behavior of anticorrosive coating systems used in nuclear vessels in service and under the accident conditions of radiation decontamination, steam chemical resistance, thermal conductivity, weathering accelerated aging are presented and discussed. (author)

  2. Qualifications and Skills: The Organisational Perspective

    Science.gov (United States)

    Dafou, Efthimia

    2009-01-01

    This paper portrays the inferences that employers in Greece draw from particular aspects of study programmes, as recorded on educational qualifications. Based on semi-structured interviews with human resource managers in 37 industrial and service organisations and general directors of careers offices in eight higher education institutions, and…

  3. 75 FR 74748 - Senior Executive Service; Appointment of Members to the Performance Review Board

    Science.gov (United States)

    2010-12-01

    ... Commissioner, Office of Employment and Unemployment Statistics--appointment expires on 09/30/2013 EBSA Sharon S... 9/30/12 OLMS Stephen J. Willertz, Director, Office of Enforcement and International Union Audits...

  4. 19 CFR 141.14 - Deceased or insolvent consignees and court-appointed administrators.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Deceased or insolvent consignees and court-appointed administrators. 141.14 Section 141.14 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION... administrators. The executor or administrator of the estate of a deceased consignee, the receiver or other legal...

  5. Application of Microprocessor-Based Equipment in Nuclear Power Plants - Technical Basis for a Qualification Methodology

    International Nuclear Information System (INIS)

    Korsah, K.

    2001-01-01

    This document (1) summarizes the most significant findings of the ''Qualification of Advanced Instrumentation and Control (I and C) Systems'' program initiated by the Nuclear Regulatory Commission (NRC); (2) documents a comparative analysis of U.S. and European qualification standards; and (3) provides recommendations for enhancing regulatory guidance for environmental qualification of microprocessor-based safety-related systems. Safety-related I and C system upgrades of present-day nuclear power plants, as well as I and C systems of Advanced Light-Water Reactors (ALWRs), are expected to make increasing use of microprocessor-based technology. The Nuclear Regulatory Commission (NRC) recognized that the use of such technology may pose environmental qualification challenges different from current, analog-based I and C systems. Hence, it initiated the ''Qualification of Advanced Instrumentation and Control Systems'' program. The objectives of this confirmatory research project are to (1) identify any unique environmental-stress-related failure modes posed by digital technologies and their potential impact on the safety systems and (2) develop the technical basis for regulatory guidance using these findings. Previous findings from this study have been documented in several technical reports. This final report in the series documents a comparative analysis of two environmental qualification standards--Institute of Electrical and Electronics Engineers (IEEE) Std 323-1983 and International Electrotechnical Commission (IEC) 60780 (1998)--and provides recommendations for environmental qualification of microprocessor-based systems based on this analysis as well as on the findings documented in the previous reports. The two standards were chosen for this analysis because IEEE 323 is the standard used in the U.S. for the qualification of safety-related equipment in nuclear power plants, and IEC 60780 is its European counterpart. In addition, the IEC document was published in

  6. A growth analysis of teacher qualifications and students' global self-esteem

    DEFF Research Database (Denmark)

    Kristensen, Rune Müller

    2017-01-01

    , educational degree and employment status have a minor but significant effect on students’ GSE. Some of these effects differ between boys and girls, showing that boys react positively to teachers with high levels of content knowledge, while girls react positively to teachers with a higher degree of pedagogical...... teacher qualifications in terms of certification, educational degree and employment status affect students’ development in GSE. Effects of teacher qualifications influence on students’ development in GSE over time is modelled using growth curve analysis. Results show that elements in teacher certification......There is an increased focus on students’ non-academic outcomes of schooling and its long-term impact on the adolescents’ later life. Teachers are viewed as the most significant factor in schools for improving student learning and development. Little is known on effects of teacher qualifications...

  7. Seismic and environmental qualification of class IE equipment manufactured in Spain

    International Nuclear Information System (INIS)

    Gerini, P.; Lumbreras, A.; Naredo, F.

    1978-01-01

    Nuclear power plant instrumentation and control design is affected by several factors such as various plant operating conditions, transient response capability, safety requirements and changes in IEEE standards. Recent upgraded IEEE standards that call for Qualification of all Safety related I anc C equipment, namely IEEE 323 (Qualifying Class IE Electric Equipment for nuclear power generating stations) and its daughter Standard IEEE 344 (Recommended Practices for Seismic Qualification of Class IE Equipment for nuclear power generating stations) have been endorsed by the United States Nuclear Regulatory Commission through the issuance of corresponding Regulatory Guides. The author describes the Qualification requirements applicable to the Class IE I and C Components made in Spain for the different vintages of plants, and the programs implemented or plans established by Westinghouse to fulfill those requirements. (author)

  8. Commercial Parts Technology Qualification Processes

    Science.gov (United States)

    Cooper, Mark S.

    2013-01-01

    Many high-reliability systems, including space systems, use selected commercial parts (including Plastic Encapsulated Microelectronics or PEMs) for unique functionality, small size, low weight, high mechanical shock resistance, and other factors. Predominantly this usage is subjected to certain 100% tests (typically called screens) and certain destructive tests usually (but not always) performed on the flight lot (typically called qualification tests). Frequently used approaches include those documented in EEE-INST-002 and JPL DocID62212 (which are sometimes modified by the particular aerospace space systems manufacturer). In this study, approaches from these documents and several space systems manufacturers are compared to approaches from a launch systems manufacturer (SpaceX), an implantable medical electronics manufacturer (Medtronics), and a high-reliability transport system process (automotive systems). In the conclusions section, these processes are outlined for all of these cases and presented in tabular form. Then some simple comparisons are made. In this introduction section, the PEM technology qualification process is described, as documented in EEE-INST-002 (written by the Goddard Space Flight Center, GSFC), as well as the somewhat modified approach employed at the Jet Propulsion Laboratory (JPL). Approaches used at several major NASA contractors are also described

  9. French nuclear plant safeguard pump qualification testing: EPEC test loop

    International Nuclear Information System (INIS)

    Guesnon, H.

    1985-01-01

    This paper reviews the specifications to which nuclear power plant safeguard pumps must be qualified, and surveys the qualification methods and program used in France to verify operability of the pump assembly and major pump components. The EPEC test loop is described along with loop capabilities and acheivements up to now. This paper shows, through an example, the Medium Pressure Safety Injection Pump designed for service in 1300 MW nuclear power plants, and the interesting possibilities offered by qualification testing

  10. 77 FR 15104 - Environmental Laboratory Advisory Board Membership

    Science.gov (United States)

    2012-03-14

    ... EPA Administrator, Science Advisor, and Forum on Environmental Measurements about cross-cutting issues... person or organization may nominate qualified persons to be considered for appointment to this advisory committee. Individuals may self-nominate. Nominees should possess the following qualifications: Demonstrated...

  11. 75 FR 52958 - Solicitation for Nominations for Members of the U.S. Preventive Services Task Force (USPSTF)

    Science.gov (United States)

    2010-08-30

    ... economics. For individuals with clinical expertise in primary health care, additional qualifications in one... have no substantial conflicts of interest, whether financial, professional, or other conflicts, that... financial holdings, consultancies, and research grants or contracts. Nominee Selection Appointments to the...

  12. Qualification of NDE personnel in the nuclear industry

    International Nuclear Information System (INIS)

    Epps, T.N.

    1984-01-01

    There has been evidence of ineffective programs for certifying nondestructive examination (NDE) personnel who conduct periodic inservice examinations in nuclear power plants under ASME Section XI Code requirements. This was brought to the attention of a group from the electric utility industry, the Electric Power Research Institute (EPRI), some NDE consultants and representatives from the American Society of Mechanical Engineers (ASME) by the Nuclear Regulatory Commission (NRC) in a May, 1982 meeting in Bethesda, Maryland. One problem pointed out by the NRC was the lack of a clear definition of qualification requirements for certification of NDE personnel who conduct ASME Section XI Inservice Inspection work in nuclear power plants. The NRC requested that the nuclear industry resolve this problem by formulating definitive qualification requirements for personnel certification that could be made an industry requirement. In June, 1982 the EPRI NDE Subcommittee held a general meeting for utility representatives to discuss the results of the May, 1982 meeting to develop a plan for industry response to the issue. The consensus was that an Ad Hoc Committee of utility representatives be convened to develop a document outlining qualification requirements for vertification of NDE personnel. The Ad Hoc Committee was formally convened on September 29, 1982

  13. Overview of the IAEA's activity on ISI qualification

    International Nuclear Information System (INIS)

    Trampus, P.

    2000-01-01

    The IAEA Subprogram on Nuclear Power Planning, Implementation and Performance is presented. It's objective is to assist Member States in: planning nuclear power programmes in an integrated manner considering all necessary factors; systematically improving overall performance and competitiveness of NPPs trough entire service life with due regard to safety; applying technological/engineering best practices including QA/QM in all areas of nuclear power utilisation. International working group on life management of NPPs (IWG-LMNPP) has been established in 1975 with 26 Member States and 2 international organizations in order to provide the Director General with advice and opinions and the Member States with information, recommendations and support in life management issues.The technical co-operation program RER/4/020 'Advanced NDT of Primary Circuit Components' is presented.The pilot study is aimed to provide the participating Member States with practical advice how to apply the IAEA's qualification methodology. The target application is Technical Justification for UT of WWER-1000 RPV shell weld (unit 5 of 'Kozloduy NPP). The concept is to simulate the qualification process through assistance to establish qualification for a real NPP component, using real ISI, in a real regulatory environment. Interim results for Bulgaria are reported and further tasks are outlined

  14. Experience with the implementation of a risk-based ISI program and inspection qualification

    International Nuclear Information System (INIS)

    Chapman, O.J.V.

    1996-01-01

    Rolls Royce and Associates (RRA) are the Design Authority (DA) for Nuclear Steam Raising Plant (NSRP) used for the Royal Naval Nuclear Fleet. Over the past seven years RRA, with support from the Ministry of Defense, has developed and implemented a risk based in-service inspection (RBISI) strategy for the NSRP. Having used risk as a means of optimizing where to inspect, an inspection qualification (IQ) process has now been put in place to ensure that proposed inspections deliver the expected gains assumed. This qualification process follows very closely that currently being put forward by the European Network on Inspection Qualification (ENIQ)

  15. Mock-up qualification and prototype manufacture for ITER current leads

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Tingzhi, E-mail: tingszhou@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Lu, Kun; Ran, Qingxiang; Ding, Kaizhong; Feng, Hansheng; Wu, Huan; Liu, Chenglian; Song, Yuntao [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Niu, Erwu [CNDA, Ministry of Science and Technology, Beijing (China); Bauer, Pierre; Devred, Arnaud [Magnet Division, ITER Organization, Cadarache (France)

    2015-10-15

    Highlights: • Vacuum brazing and electron beam welding qualification. • Machine and assembly strategy of fin type heat exchanger. • Soldering and joint resistance test of superconducting joint. • Pre-preg technology with vacuum bag on insulation. - Abstract: Three types of high temperature superconducting current leads (HTSCL) are designed to carry 68 kA, 55 kA or 10 kA to the ITER magnets. Before the supply of the HTS current lead series, the design and manufacturing process is qualified through mock-ups and prototypes. Seven mock-ups, representing the critical technologies of the current leads, were built and tested successfully in the Institute of Plasma Physics of the Chinese Academy of Sciences (ASIPP) in 2013. After the qualification some design features of the HTS leads were updated. This paper summarizes the qualification through mock-ups. In 2014 ASIPP started the manufacture of the prototypes. The preparation and manufacturing process are also described.

  16. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Hassan, M.; Tanaka, T.J.

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

  17. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K.; Wood, R.T. [Oak Ridge National Lab., TN (United States); Hassan, M. [Brookhaven National Lab., Upton, NY (United States); Tanaka, T.J. [Sandia National Labs., Albuquerque, NM (United States)

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants.

  18. Seismic qualification testing at the National Engineering Laboratory

    International Nuclear Information System (INIS)

    Fairbairn, J.

    1984-01-01

    Servohydraulic shaker tables have been developed for the simulation of vibration environments including earthquakes. The use of these facilities for seismic qualification of nuclear equipment is described. (author)

  19. Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 3. Recommendations for improvement of equipment qualification methodology and criteria. Volume 3

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-08-01

    The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 3 presents recommendations for improvement of equipment qualification methodology and procedural clarification/modification. The fifth category identifies issues where adequate information does not exist to allow a recommendation to be made

  20. Radiation Safety (Qualifications) Regulations 1980

    International Nuclear Information System (INIS)

    1980-01-01

    These Regulations, promulgated pursuant to the provisions of the Radiation Safety Act, 1975-1979, require persons engaged in activities involving radiation to pass a radiation safety examination or to possess an approved qualification in radiation. The National Health and Medical Research Council is authorised to exempt persons from compliance with these requirements or, conversely, to impose such requirements on persons other than those designated. (NEA) [fr