WorldWideScience

Sample records for ptti planning meeting

  1. The 22nd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    International Nuclear Information System (INIS)

    Sydnor, R.L.

    1990-05-01

    Papers presented at the 22nd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting are compiled. The following subject areas are covered: Rb, Cs, and H-based frequency standards and cryogenic and trapped-ion technology; satellite laser tracking networks, GLONASS timing, intercomparison of national time scales and international telecommunications; telecommunications, power distribution, platform positioning, and geophysical survey industries; military communications and navigation systems; and dissemination of precise time and frequency by means of GPS, GLONASS, MIL STAR, LORAN, and synchronous communication satellites

  2. Proceedings of Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting (23rd) held in Pasadena, California on December 3-5, 1991

    Science.gov (United States)

    1991-12-05

    Between Two Western European Time Laboratories and VNIIFTRI ............. 341 P Daly, University of Leeds, N.B. Koshelyaevsky, VNIIFTRI , and W Lewandowski...equipped with GPS time receivers and contributing to TAI. The last GPS antenna position determined by the BIPM is installed near Moscow in the VNIIFTRI : it...Leeds and VNIIFTRI ", accepted in Proc. 23rd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting, 1991. 15. W. Lewandowski and

  3. 29TH Annual Precise Time and Time Interval (PTTI) Systems and Applications Meeting

    National Research Council Canada - National Science Library

    1998-01-01

    ...) Applications of PTTI technology to evolving military navigation and communication systems; geodesy; aviation; and pulsars; 4) Dissemination of precise time and frequency by means of GPS, geosynchronous communication satellites, and computer networks.

  4. Theoretical studies of Pt-Ti nanoparticles for potential use as PEMFC electrocatalysts.

    Science.gov (United States)

    Jennings, Paul C; Pollet, Bruno G; Johnston, Roy L

    2012-03-07

    A theoretical investigation is presented of alloying platinum with titanium to form binary Pt-Ti nanoalloys as an alternative to the expensive pure platinum catalysts commonly used for Proton Exchange Membrane Fuel Cell cathode electrocatalysts. Density Functional Theory calculations are performed to investigate compositional effects on structural properties as well as Oxygen Reduction Reaction kinetics and poisoning effects. High symmetry A(32)-B(6) clusters are studied to investigate structural properties. From these structures binding energies of hydroxyl and carbon monoxide are studied on a range of sites on the surface of the clusters. Promising results are obtained suggesting that the bimetallic Pt-Ti nanoalloys may exhibit enhanced properties compared to pure platinum catalysts.

  5. Planning and conducting meetings effectively, part I: planning a meeting.

    Science.gov (United States)

    Harolds, Jay

    2011-12-01

    Meetings are held by leaders for many purposes, including conveying information, raising morale, asking for opinions, brain storming, making people part of the problem-solving process, building trust, getting to a consensus, and making decisions. However, many meetings waste time, some undermine the leader's power, and some decrease morale. Part I of this series of articles gives some tips on basic planning for decision-making meetings. Part II of this series of articles analyzes selected components of decision-making meetings. Part III of this series will be on how the chairperson keeps decision-making meetings on track to make them efficient and productive.

  6. Resource assessment/commercialization planning meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  7. The Improvement of Electrical Characteristics of Pt/Ti Ohmic Contacts to Ga-Doped ZnO by Homogenized KrF Pulsed Excimer Laser Treatment

    Science.gov (United States)

    Oh, Min-Suk

    2018-04-01

    We investigated the effect of KrF excimer laser surface treatment on Pt/Ti ohmic contacts to Ga-doped n-ZnO ( N d = 4.3 × 1017 cm-3). The treatment of the n-ZnO surfaces by laser irradiation greatly improved the electrical characteristics of the metal contacts. The Pt/Ti ohmic layer on the laser-irradiated n-ZnO showed specific contact resistances of 2.5 × 10-4 ˜ 4.8 × 10-4 Ω cm2 depending on the laser energy density and gas ambient, which were about two orders of magnitude lower than that of the as-grown sample, 8.4 × 10-2 Ω cm2. X-ray photoelectron spectroscopy and photoluminescence measurements showed that the KrF excimer laser treatments increased the electron concentration near the surface region of the Ga-doped n-ZnO due to the preferential evaporation of oxygen atoms from the ZnO surface by the laser-induced dissociation of Zn-O bonds.

  8. 78 FR 5481 - Quagga Mussel Strategic Planning Meeting

    Science.gov (United States)

    2013-01-25

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-HQ-FHC-2013-N008; 94140-1341-0000-N5] Quagga Mussel Strategic Planning Meeting AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: This notice announces a meeting to gather information for planning an FY13 strategy to...

  9. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  10. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Science.gov (United States)

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor...

  11. 2013 Building America Research Planning Meeting Summary

    Energy Technology Data Exchange (ETDEWEB)

    Metzger, C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hunt, S. [Confluence Communications, Missoula, MT (united States)

    2014-02-01

    The Building America Research Planning Meeting was held October 28-30, 2013, in Washington, DC. This meeting provides one opportunity each year for the research teams, national laboratories and Department of Energy (DOE) managers to meet in person to share the most pertinent information and collaboration updates. This report documents the presentations, highlights key program updates, and outlines next steps for the program.

  12. Evaluating interfacial adhesion properties of Pt/Ti thin-film by using acousto-optic technique

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hae Sung [Graduate School of Automotive Engineering, Seoul National University of Science and Technology, Seoul (Korea, Republic of); Didie, David; Yoshida, Sanichiro [Dept. of Chemistry and Physics, Southeastern Louisiana University, Hammond (United States); Park, Ik Keun [Dept. of Mechanical and Automotive Engineering, Seoul National University of Science and Technology, Seoul (Korea, Republic of)

    2016-06-15

    We propose an acousto-optic technique for the nondestructive evaluation of adhesion properties of a Pt/Ti thin-film interface. Since there are some problems encountered when using prevailing techniques to nondestructively evaluate the interfacial properties of micro/nano-scale thin-films, we applied an interferometer that combined the acoustic and optical methods. This technique is based on the Michelson interferometer but the resultant surface of the thin film specimen makes interference instead of the mirror when the interface is excited from the acoustic transducer at the driving frequency. The thin film shows resonance-like behavior at a certain frequency range, resulting in a low-contrast fringe pattern. Therefore, we represented quantitatively the change in fringe pattern as a frequency spectrum and discovered the possibility that the interfacial adhesion properties of a thin film can be evaluated using the newly proposed technique.

  13. 2013 Building America Research Planning Meeting Summary

    Energy Technology Data Exchange (ETDEWEB)

    Metzger, Cheryn E. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hunt, Stacy [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-02-01

    The Building America (BA) Research Planning Meeting was held October 28-30, 2013, in Washington, DC. This meeting provides one opportunity each year for the research teams, national laboratories and Department of Energy (DOE) managers to meet in person to share the most pertinent information and collaboration updates. This report documents the presentations, highlights key program updates, and outlines next steps for the program.

  14. Overcoming Family Planning Challenges in Africa: Toward Meeting ...

    African Journals Online (AJOL)

    USER

    Overcoming Family Planning Challenges in Africa: Toward Meeting. Unmet Need ... The challenges posed are greater in ... Gaps in meeting women's needs persist especially ..... WHO. Everybody's business: Strengthening health systems to.

  15. 77 FR 1051 - General Conference Committee of the National Poultry Improvement Plan; Meeting

    Science.gov (United States)

    2012-01-09

    ...] General Conference Committee of the National Poultry Improvement Plan; Meeting AGENCY: Animal and Plant... the General Conference Committee of the National Poultry Improvement Plan. DATES: The meeting will be... INFORMATION CONTACT: Dr. C. Stephen Roney, Senior Coordinator, National Poultry Improvement Plan, VS, APHIS...

  16. Residential Energy Efficiency Research Planning Meeting Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-02-01

    This report summarizes key findings and outcomes from the U.S. Department of Energy's Building America Residential Energy Efficiency Research Planning meeting, held on October 28-29, 2011, in Washington, D.C.

  17. Summary of Prioritized Research Opportunities. Building America Planning Meeting, November 2-4, 2010

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-02-01

    This report outlines the results of brainstorming sessions conducted at the Building America Fall 2010 planning meeting, in which research teams and national laboratories identified key research priorities to incorporate into multi-year planning, team research agendas, expert meetings, and technical standing committees.

  18. 76 FR 1592 - National Poultry Improvement Plan; General Conference Committee Meeting

    Science.gov (United States)

    2011-01-11

    ...] National Poultry Improvement Plan; General Conference Committee Meeting AGENCY: Animal and Plant Health... General Conference Committee of the National Poultry Improvement Plan. DATES: The General Conference... Improvement Plan, VS, APHIS, 1498 Klondike Road, Suite 101, Conyers, GA 30094-5104; (770) 922-3496...

  19. Overcoming family planning challenges in Africa: toward meeting ...

    African Journals Online (AJOL)

    Overcoming family planning challenges in Africa: toward meeting unmet need and scaling up service delivery. Andrzej Kulczycki. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · AJOL African Journals Online. HOW TO USE AJOL.

  20. 75 FR 23222 - National Poultry Improvement Plan; General Conference Committee Meeting and 40th Biennial Conference

    Science.gov (United States)

    2010-05-03

    ...] National Poultry Improvement Plan; General Conference Committee Meeting and 40th Biennial Conference AGENCY... notice of a meeting of the General Conference Committee of the National Poultry Improvement Plan (NPIP... Coordinator, National Poultry Improvement Plan, VS, APHIS, 1498 Klondike Road, Suite 101, Conyers, GA 30094...

  1. 77 FR 46374 - National Poultry Improvement Plan; General Conference Committee Meeting and 41st Biennial Conference

    Science.gov (United States)

    2012-08-03

    ...] National Poultry Improvement Plan; General Conference Committee Meeting and 41st Biennial Conference AGENCY... notice of a meeting of the General Conference Committee of the National Poultry Improvement Plan (NPIP... CONTACT: Dr. C. Stephen Roney, Senior Coordinator, National Poultry Improvement Plan, VS, APHIS, 1506...

  2. 76 FR 15307 - Notice of Staff Attendance at Southwest Power Pool Strategic Planning Committee Meeting

    Science.gov (United States)

    2011-03-21

    ... Power Pool Strategic Planning Committee Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting of the Southwest Power Pool, Inc. (SPP) Strategic Planning Committee (SPC), as noted below. Their attendance is part of the Commission's ongoing outreach...

  3. 25 CFR 1000.50 - What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What must a Tribe/Consortium seeking a planning grant submit in order to meet the planning phase requirements? 1000.50 Section 1000.50 Indians OFFICE OF THE...) Planning and Negotiation Grants Advance Planning Grant Funding § 1000.50 What must a Tribe/Consortium...

  4. SU-E-T-240: Design and Implement of An Electronic Records Function for Treatment Plan Checked Meeting

    International Nuclear Information System (INIS)

    Wu, Q

    2015-01-01

    Purpose: To replace the paper records, we designed an electronic records function for plan checked meeting in our in-house developed radiotherapy information management system(RTIMS). Methods: Since 2007, the RTIMS has been developed on a database and web service of Apache+PHP+MySQL, and almost all computers and smartphones could access the RTIMS through IE browser, to input, search, count, and print the data. In 2012, we also established an radiation therapy case conference multi-media system(RTCCMMS) based on Windows Remote Desktop feature. Since 2013, we have carried out the treatment plan checked meeting of the physics division in every afternoon for about half an hour. In 2014, we designed an electronic records function, which includes a meeting information record and a checked plan record. And the meeting record includes the following items: meeting date, name, place, length, status, attendee, content, etc. The plan record includes the followings: meeting date, meeting name, patient ID, gender, age, patient name, course, plan, purpose, position, technique, CTsim type, plan type, primary doctor, other doctor, primary physicist, other physicist, difficulty, quality, score, opinion, status, note, etc. Results: In the past year, the electronic meeting records function has been successfully developed and implemented in the division, and it could be accessed from an smartphone. Almost all items have the corresponding pull-down menu selection, and each option would try to intelligently inherit default value from the former record or other form. According to the items, we could do big data mining to the input data. It also has both Chinese and English two versions. Conclusion: It was demonstrated to be user-friendly and was proven to significantly improve the clinical efficiency and quality of treatment plan. Since the RTIMS is an in-house developed system, more functions can be added or modified to further enhance its potentials in research and clinical practice

  5. SU-E-T-240: Design and Implement of An Electronic Records Function for Treatment Plan Checked Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Q [Beijing Hospital, Beijing (China)

    2015-06-15

    Purpose: To replace the paper records, we designed an electronic records function for plan checked meeting in our in-house developed radiotherapy information management system(RTIMS). Methods: Since 2007, the RTIMS has been developed on a database and web service of Apache+PHP+MySQL, and almost all computers and smartphones could access the RTIMS through IE browser, to input, search, count, and print the data. In 2012, we also established an radiation therapy case conference multi-media system(RTCCMMS) based on Windows Remote Desktop feature. Since 2013, we have carried out the treatment plan checked meeting of the physics division in every afternoon for about half an hour. In 2014, we designed an electronic records function, which includes a meeting information record and a checked plan record. And the meeting record includes the following items: meeting date, name, place, length, status, attendee, content, etc. The plan record includes the followings: meeting date, meeting name, patient ID, gender, age, patient name, course, plan, purpose, position, technique, CTsim type, plan type, primary doctor, other doctor, primary physicist, other physicist, difficulty, quality, score, opinion, status, note, etc. Results: In the past year, the electronic meeting records function has been successfully developed and implemented in the division, and it could be accessed from an smartphone. Almost all items have the corresponding pull-down menu selection, and each option would try to intelligently inherit default value from the former record or other form. According to the items, we could do big data mining to the input data. It also has both Chinese and English two versions. Conclusion: It was demonstrated to be user-friendly and was proven to significantly improve the clinical efficiency and quality of treatment plan. Since the RTIMS is an in-house developed system, more functions can be added or modified to further enhance its potentials in research and clinical practice

  6. Summary of Prioritized Research Opportunities: Building America Program Planning Meeting, Washington, D.C., November 2-4, 2010

    Energy Technology Data Exchange (ETDEWEB)

    2011-02-01

    This report outlines the results of brainstorming sessions conducted at the Building America Fall 2010 planning meeting, in which research teams and national laboratories identified key research priorities to incorporate into multi-year planning, team research agendas, expert meetings, and technical standing committees.

  7. Proceedings of national avian-wind power planning meeting 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group`s recommendations for future research or associated activities. A final plenary session drew together the main recommendations.

  8. Proceedings of national avian-wind power planning meeting II

    International Nuclear Information System (INIS)

    1998-02-01

    This meeting was the second in a series. The purposes of this meeting were to: (1) provide information on avian/wind power interactions that will help meet the needs of regulators, researchers, and other stakeholders concerned with responsible development and permitting of wind plants; (2) create dialogue among regulators, researchers and other stakeholders to help all parties understand the role that research can play in responsible development and permitting of wind plants, and allow researchers to understand the relevance of their research to the process; and (3) propose research projects and the appropriate sponsorship. The meeting began with oral presentations and discussions of nine White Papers on the theory and methods for studying and understanding impacts. The Proceedings include the written version of each of the nine White Papers, plus a summary of the oral discussion associated with each paper. The second part of the meeting consisted of four working group sessions: (1) site evaluation and pre-permit research and planning; (2) operational monitoring; (3) modeling and forecasting, including population dynamics models; and (4) avian behavior and mortality reduction. The Proceedings includes a summary of the discussions on these topics, including each working group's recommendations for future research or associated activities. A final plenary session drew together the main recommendations

  9. 76 FR 55706 - 158th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2011-09-08

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 158th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Teleconference Meeting Pursuant to the.... 1142, the 158th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans...

  10. 78 FR 50112 - 168th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2013-08-16

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 168th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Teleconference Meeting Pursuant to the.... 1142, the 168th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans...

  11. 76 FR 6498 - 155th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2011-02-04

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 155th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Teleconference Meeting Pursuant to the.... 1142, the 155th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans...

  12. 77 FR 52061 - 163rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2012-08-28

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 163rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Teleconference Meeting Pursuant to the.... 1142, the 163rd open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans...

  13. 78 FR 24235 - 166th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2013-04-24

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 166th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 166th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  14. 75 FR 27002 - 151st Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2010-05-13

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 151st Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 151st open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans will be held on...

  15. 78 FR 5209 - 165th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2013-01-24

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 165th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 165th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  16. 76 FR 36578 - 156th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 156th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 156th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; (also known as...

  17. 78 FR 44600 - 167th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2013-07-24

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 167th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 167th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  18. 76 FR 65211 - 159th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2011-10-20

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 159th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 159th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  19. 75 FR 11199 - 150th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 150th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 150th open meeting of the full Advisory Council on Employee Welfare and Pension Benefit Plans will be...

  20. 78 FR 62708 - 169th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 169th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 169th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  1. 77 FR 66186 - 164th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2012-11-02

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 164th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 164th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  2. 75 FR 57063 - 153rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2010-09-17

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 153rd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 153rd open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans will be held on...

  3. 77 FR 28406 - 161st Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2012-05-14

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 161st Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 161st open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  4. 77 FR 11159 - 160th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2012-02-24

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 160th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 160th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  5. 75 FR 47636 - 152nd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2010-08-06

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 152nd Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 152nd open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans will be held on...

  6. 77 FR 59420 - 164th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 164th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 164th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  7. 76 FR 48903 - 157th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2011-08-09

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration 157th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting Pursuant to the authority... 157th open meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans (also known as...

  8. The Chip-Scale Atomic Clock - Recent Development Progress

    Science.gov (United States)

    2004-09-01

    35th Annual Precise Time and Time Interval (PTTI) Meeting 467 THE CHIP-SCALE ATOMIC CLOCK – RECENT DEVELOPMENT PROGRESS R. Lutwak ...1] R. Lutwak , et al., 2003, “The Chip-Scale Atomic Clock – Coherent Population Trapping vs. Conventional Interrogation,” in

  9. 78 FR 33799 - National Poultry Improvement Plan; General Conference Committee Meeting

    Science.gov (United States)

    2013-06-05

    ... Washington, DC, this 3rd day of June 2013. Kevin Shea, Acting Administrator, Animal and Plant Health... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2013-0032] National Poultry Improvement Plan; General Conference Committee Meeting AGENCY: Animal and Plant Health...

  10. The Effects of Using the Transition Planning Inventory and a Structured IEP Process as a Transition Planning Intervention on IEP Meeting Outcomes

    Science.gov (United States)

    Rehfeldt, Jason D.; Clark, Gary M.; Lee, Steven W.

    2012-01-01

    This study examined two areas. First, the authors looked at whether secondary individualized education program (IEP) teams who used the "Transition Planning Inventory" (TPI) in conjunction with a structured IEP meeting that based discussions and decisions on TPI data as a planning intervention generated significantly more…

  11. 75 FR 64947 - 154th Meeting of the Advisory Council on Employee Welfare and Pension Benefit Plans; Notice of...

    Science.gov (United States)

    2010-10-20

    ... Council on Employee Welfare and Pension Benefit Plans; Notice of Meeting; Notice #0;#0;Federal Register... Employee Benefits Security Administration 154th Meeting of the Advisory Council on Employee Welfare and... Advisory Council on Employee Welfare and Pension Benefit Plans will be held on November 3-4, 2010. The...

  12. Phases of QCD: Summary of the Rutgers Long Range Plan Town Meeting, January 12-14, 2007

    International Nuclear Information System (INIS)

    Jacobs, Peter; Kharzeev, Dmitri; Muller, Berndt; Nagle, Jamie; Rajagopal, Krishna; Vigdor, Steve

    2007-01-01

    This White Paper summarizes the outcome of the Town Meeting on Phases of QCD that took place January 12-14, 2007 at Rutgers University, as part of the NSAC 2007 Long Range Planning process. The meeting was held in conjunction with the Town Meeting on Hadron Structure, including a full day of joint plenary sessions of the two meetings. Appendix A.1 contains the meeting agenda. This Executive Summary presents the prioritized recommendations that were determined at the meeting. Subsequent chapters present the essential background to the recommendations. While this White Paper is not a scholarly article and contains few references, it is intended to provide the non-expert reader

  13. Phases of QCD: Summary of the Rutgers Long Range Plan Town Meeting, January 12-14, 2007

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, Peter; Kharzeev, Dmitri; Muller, Berndt; Nagle, Jamie; Rajagopal, Krishna; Vigdor, Steve

    2007-05-14

    This White Paper summarizes the outcome of the Town Meeting on Phases of QCD that took place January 12-14, 2007 at Rutgers University, as part of the NSAC 2007 Long Range Planning process. The meeting was held in conjunction with the Town Meeting on Hadron Structure, including a full day of joint plenary sessions of the two meetings. Appendix A.1 contains the meeting agenda. This Executive Summary presents the prioritized recommendations that were determined at the meeting. Subsequent chapters present the essential background to the recommendations. While this White Paper is not a scholarly article and contains few references, it is intended to provide the non-expert reader

  14. A2e High Fidelity Modeling: Strategic Planning Meetings

    Energy Technology Data Exchange (ETDEWEB)

    Hammond, Steven W. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sprague, Michael A. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Womble, David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barone, Matt [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    Atmosphere to electrons (A2e) is a multi-year U.S. Department of Energy (DOE) research initiative targeting significant reductions in the cost of wind energy through an improved understanding of the complex physics governing wind flow into and through whole wind farms. Better insight into the flow physics of large multi-turbine arrays will address the plant-level energy losses, is likely to reduce annual operational costs by hundreds of millions of dollars, and will improve project financing terms to more closely resemble traditional capital projects. In support of this initiative, two planning meetings were convened, bringing together professionals from universities, national laboratories, and industry to discuss wind plant modeling challenges, requirements, best practices, and priorities. This report documents the combined work of the two meetings and serves as a key part of the foundation for the A2e/HFM effort for predictive modeling of whole wind plant physics.

  15. The demographic impact and development benefits of meeting demand for family planning with modern contraceptive methods.

    Science.gov (United States)

    Goodkind, Daniel; Lollock, Lisa; Choi, Yoonjoung; McDevitt, Thomas; West, Loraine

    2018-01-01

    Meeting demand for family planning can facilitate progress towards all major themes of the United Nations Sustainable Development Goals (SDGs): people, planet, prosperity, peace, and partnership. Many policymakers have embraced a benchmark goal that at least 75% of the demand for family planning in all countries be satisfied with modern contraceptive methods by the year 2030. This study examines the demographic impact (and development implications) of achieving the 75% benchmark in 13 developing countries that are expected to be the furthest from achieving that benchmark. Estimation of the demographic impact of achieving the 75% benchmark requires three steps in each country: 1) translate contraceptive prevalence assumptions (with and without intervention) into future fertility levels based on biometric models, 2) incorporate each pair of fertility assumptions into separate population projections, and 3) compare the demographic differences between the two population projections. Data are drawn from the United Nations, the US Census Bureau, and Demographic and Health Surveys. The demographic impact of meeting the 75% benchmark is examined via projected differences in fertility rates (average expected births per woman's reproductive lifetime), total population, growth rates, age structure, and youth dependency. On average, meeting the benchmark would imply a 16 percentage point increase in modern contraceptive prevalence by 2030 and a 20% decline in youth dependency, which portends a potential demographic dividend to spur economic growth. Improvements in meeting the demand for family planning with modern contraceptive methods can bring substantial benefits to developing countries. To our knowledge, this is the first study to show formally how such improvements can alter population size and age structure. Declines in youth dependency portend a demographic dividend, an added bonus to the already well-known benefits of meeting existing demands for family planning.

  16. 75 FR 30900 - Sunshine Act Meetings; Unified Carrier Registration Plan Board of Directors

    Science.gov (United States)

    2010-06-02

    ... DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration Sunshine Act Meetings; Unified Carrier Registration Plan Board of Directors AGENCY: Federal Motor Carrier Safety Administration... at the Hotel Park City, 2001 Park Avenue, Park City, UT 84060. Any interested person may call Mr...

  17. Meeting the Needs of the Hidden Minority: Transition Planning Tips for LGBTQ Youth

    Science.gov (United States)

    Dykes, Frank; Thomas, Suzanne

    2015-01-01

    Effective transition planning requires school personnel to ascertain the preferences and interests of the student and to focus on services including instruction, related services, employment, and postschool living arrangements necessary to support postschool outcomes. While great strides have been made in meeting the needs of students with…

  18. Planning meeting combined analysis, North America residential radon studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This report describes the Third International Department of Energy/ Commission of European Communities Workshop on Residential Radon Epidemiology held in February 1995 in Baltimore, MD. This culminates a major effort begun 1988, co-sponsored by the DOE and the CEC Radiation Protection Programme to identify and bring together all those scientists worldwide performing epidemiological case control studies of residential radon and lung cancer. Two prior meetings were held in 1989 and 1991. The goal of this effort is to work with the investigators and to pool these studies to increase their limited statistical power and to maximize any information that could be gained from them. That goal has now been met. At this Workshop the task moved from planning and agreement to implementation, as many of the studies were finally being completed and published. This report provides a summary of the Workshop as well as that of the first implementation workgroup meeting hosted by Health Canada. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  19. Involvement in Transition Planning Meetings among High School Students with Autism Spectrum Disorders

    Science.gov (United States)

    Griffin, Megan M.; Taylor, Julie Lounds; Urbano, Richard C.; Hodapp, Robert M.

    2014-01-01

    Although students with autism spectrum disorders (ASD) are least likely to attend and participate in transition planning meetings, little is known about factors related to their involvement. Using a national data set, we conducted regressions to identify predictors of the involvement of 320 youth with ASD. Attendance positively related to higher…

  20. Residential Energy Efficiency Research Planning Meeting Summary Report: Washington, D.C. - October 27-28, 2011

    Energy Technology Data Exchange (ETDEWEB)

    2012-02-01

    This report summarizes key findings and outcomes from the U.S. Department of Energy's Building America Residential Energy Efficiency Research Planning meeting, held on October 28-29, 2011, in Washington, D.C.

  1. Physical Layer Ethernet Clock Synchronization

    Science.gov (United States)

    2010-11-01

    42 nd Annual Precise Time and Time Interval (PTTI) Meeting 77 PHYSICAL LAYER ETHERNET CLOCK SYNCHRONIZATION Reinhard Exel, Georg...oeaw.ac.at Nikolaus Kerö Oregano Systems, Mohsgasse 1, 1030 Wien, Austria E-mail: nikolaus.keroe@oregano.at Abstract Clock synchronization ...is a service widely used in distributed networks to coordinate data acquisition and actions. As the requirement to achieve tighter synchronization

  2. Sustainable urban energy planning: A strategic approach to meeting climate and energy goals

    Energy Technology Data Exchange (ETDEWEB)

    Dobriansky, Larisa

    2010-09-15

    Meeting our 21st century challenges will require sustainable energy planning by our cities, where over half of the population resides. This already has become evident in the State of California, which has set rigorous greenhouse gas emission reduction targets and timeframes. To attain these targets will necessitate technically-integrated and cost-optimum solutions for innovative asset development and management within urban communities. Using California as a case study, this paper focuses on the crucial role for sustainable energy planning in creating the context and conditions for integrating and optimizing clean and efficient energy use with the urban built environment and infrastructure.

  3. Family participation in care plan meetings : Promoting a collaborative organizational culture in nursing homes

    NARCIS (Netherlands)

    Dijkstra, Ate

    In this study, the author evaluated a project in The Netherlands that aimed to promote family members' participation in care plan meetings at a psychogeriatric nursing home. The small-scale pilot project, which was conducted in four wards of the nursing home, was designed to involve families in

  4. Quadrupole Transition Spectrum Measurement of Single Ca+ Ions Toward Optical Frequency Standards

    Science.gov (United States)

    2007-01-01

    Gill, 2005, “Optical frequency standards,” Metrologia , 42, S125-S137. [2] M. Kajita, K. Matsubara, Y. Li, K. Hayasaka, and M. Hosokawa, 2004...Interval (PTTI) Meeting 1 10 100 1000 10-15 10-14 10-13 10-12 10-11 Averaging Time [s] R oo t Al la n Va ria nc e 729nm LD by FC8003 729nm LD by

  5. Planning meeting to form the CMSN Team: Building a unified computational model for the resonant X-ray scattering of strongly correlated materials. Final report

    International Nuclear Information System (INIS)

    van Veenendaal, M.

    2008-01-01

    The planning meeting was held May 21-23 2008 at Argonne National Laboratory (ANL). The purpose of the meeting was to establish a network on building computational model for resonant elastic and inelastic x-ray scattering. This course of action was recommended by program officer Dale Koelling after the initial submission of a proposal for a Computational Materials Science Network to Basic Energy Sciences. The meeting consisted of talks and discussion. At the end of the meeting three subgroups were formed. After the successful formation of the team, a new proposal was written which was funded by BES. Since this was a planning meeting there were no proceedings. The program and titles of talks are given.

  6. Expert Meeting on National Planning of Documentation and Library Services in Africa (Kampala, Uganda, 7-15 December 1970). Final Report.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    The three objectives of this meeting are: (1) to evolve principles for the national planning of documentation and library services in African countries in relation to social, economic and educational plans; (2) to assess the documentation and library needs of African States and correlate a plan of development of these services for the region with…

  7. Summary and Recommendations from the National Cancer Institute's Clinical Trials Planning Meeting on Novel Therapeutics for Non-Muscle Invasive Bladder Cancer

    NARCIS (Netherlands)

    Lerner, S.P.; Bajorin, D.F.; Dinney, C.P.; Efstathiou, J.A.; Groshen, S.; Hahn, N.M.; Hansel, D.; Kwiatkowski, D.; O'Donnell, M.; Rosenberg, J.; Svatek, R.; Abrams, J.S.; Al-Ahmadie, H.; Apolo, A.B.; Bellmunt, J.; Callahan, M.; Cha, E.K.; Drake, C.; Jarow, J.; Kamat, A.; Kim, W.; Knowles, M.; Mann, B.; Marchionni, L.; McConkey, D.; McShane, L.; Ramirez, N.; Sharabi, A.; Sharpe, A.H.; Solit, D.; Tangen, C.M.; Amiri, A.T.; Allen, E. Van; West, P.J.; Witjes, J.A.; Quale, D.Z.

    2016-01-01

    The NCI Bladder Cancer Task Force convened a Clinical Trials Planning Meeting (CTPM) Workshop focused on Novel Therapeutics for Non-Muscle Invasive Bladder Cancer (NMIBC). Meeting attendees included a broad and multi-disciplinary group of clinical and research stakeholders and included leaders from

  8. 75 FR 5595 - HIT Standards Committee Advisory Meeting; Notice of Meeting

    Science.gov (United States)

    2010-02-03

    ... Technology HIT Standards Committee Advisory Meeting; Notice of Meeting AGENCY: Office of the National... Health Information Technology (ONC). The meeting will be open to the public. Name of Committee: HIT... Federal Health IT Strategic Plan, and in accordance with policies developed by the HIT Policy Committee...

  9. 75 FR 21628 - HIT Standards Committee Advisory Meeting; Notice of Meeting

    Science.gov (United States)

    2010-04-26

    ... Technology HIT Standards Committee Advisory Meeting; Notice of Meeting AGENCY: Office of the National... Information Technology (ONC). The meeting will be open to the public. Name of Committee: HIT Standards... Strategic Plan, and in accordance with policies developed by the HIT Policy Committee. Date and Time: The...

  10. The Chip-Scale Atomic Clock - Prototype Evaluation

    Science.gov (United States)

    2007-11-01

    39th Annual Precise Time and Time Interval (PTTI) Meeting THE CHIP-SCALE ATOMIC CLOCK – PROTOTYPE EVALUATION R. Lutwak *, A. Rashed...been supported by the Defense Advanced Research Projects Agency, Contract # NBCHC020050. REFERENCES [1] R. Lutwak , D. Emmons, W. Riley, and...D.C.), pp. 539-550. [2] R. Lutwak , D. Emmons, T. English, W. Riley, A. Duwel, M. Varghese, D. K. Serkland, and G. M. Peake, 2004, “The Chip-Scale

  11. Department of Defense Precise Time and Time Interval program improvement plan

    Science.gov (United States)

    Bowser, J. R.

    1981-01-01

    The United States Naval Observatory is responsible for ensuring uniformity in precise time and time interval operations including measurements, the establishment of overall DOD requirements for time and time interval, and the accomplishment of objectives requiring precise time and time interval with minimum cost. An overview of the objectives, the approach to the problem, the schedule, and a status report, including significant findings relative to organizational relationships, current directives, principal PTTI users, and future requirements as currently identified by the users are presented.

  12. Do intervention plans meet criteria for effective practice to reduce recidivism? How probation officers forget about social capital and basic needs

    NARCIS (Netherlands)

    Bosker, J.; Witteman, C.; Hermanns, J.

    2013-01-01

    The increased use of instruments for assessing risks and needs in probation should lead to intervention plans that meet the criteria for effective practice. An analysis of 300 intervention plans from the Dutch probation service showed that the match between the assessed criminogenic needs and the

  13. Setting Ambitious yet Achievable Targets Using Probabilistic Projections: Meeting Demand for Family Planning.

    Science.gov (United States)

    Kantorová, Vladimíra; New, Jin Rou; Biddlecom, Ann; Alkema, Leontine

    2017-09-01

    In 2015, governments adopted 17 internationally agreed goals to ensure progress and well-being in the economic, social, and environmental dimensions of sustainable development. These new goals present a challenge for countries to set empirical targets that are ambitious yet achievable and that can account for different starting points and rates of progress. We used probabilistic projections of family planning indicators, based on a global data set and Bayesian hierarchical modeling, to generate illustrative targets at the country level. Targets were defined as the percentage of demand for family planning satisfied with modern contraceptive methods where a country has at least a 10 percent chance of reaching the target by 2030. National targets for 2030 ranged from below 50 percent of demand satisfied with modern contraceptives (for three countries in Africa) to above 90 percent (for 41 countries from all major areas of the world). The probabilistic approach also identified countries for which a global fixed target value of 75 percent demand satisfied was either unambitious or has little chance of achievement. We present the web-based Family Planning Estimation Tool (FPET) enabling national decision makers to compute and assess targets for meeting family planning demand. © 2017 The Population Council, Inc.

  14. CFCC working group meeting: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The theme of the meeting was ``A Path to Commercialization`` and discussion was devoted to addressing the nearest-term products and the time frame for implementation. The objectives of the meeting were to identify the barriers to commercialization, methods to overcome these barriers, and the actions required to achieve success. The meeting was planned to bring together government agencies and industry customers and, suppliers to discuss and conclude where the CFCC Program is today, where it is going, and how they plan to get there. It was also planned to join component developers with end users who can describe systems needs and projected schedules for introducing CFCC components in industrial applications.

  15. 75 FR 40850 - Notice of Public Meeting

    Science.gov (United States)

    2010-07-14

    ... meeting may end early if all business is completed. If the meeting date and location are changed due to... Membership 10. Old Business a. Denali Subsistence Management Plan b. Subsistence Uses of Horns, Antlers... Subsistence Resource Commission (SRC) program. SUMMARY: The Denali National Park SRC plans to meet to develop...

  16. Alloying and microstructural changes in platinum–titanium milled and annealed powders

    International Nuclear Information System (INIS)

    Maweja, Kasonde; Phasha, M.J.; Yamabe-Mitarai, Y.

    2012-01-01

    Graphical abstract: (a) SE-SEM micrographs of PtTi martensite formed in powder milled for short time annealed at 1500 °C and quenched in helium gas flow (b) BSE-SEM of structure formed after slow cooling. Highlights: ► A disordered metastable FCC Pt(Ti) solid solution was formed after longer milling period. ► HCP Ti crystals were first deformed and then the atoms were dissolved in strained FCC Pt lattices. ► Longer milling time suppressed the occurrence of martensitic transformation after annealing. ► Martensite phase was formed in products that went through a short milling time then annealed and quenched. ► The width of the martensite features formed was smaller at higher cooling rates. - Abstract: Equiatomic platinum–titanium powder mixtures were processed by high energy ball milling under argon atmosphere and sintered under vacuum. Evolution of the crystal structures and microstructures of the products formed were investigated by XRD and SEM techniques, respectively. The HCP crystals of Ti were first deformed and then a disordered metastable FCC Pt(Ti) solid solution was formed during milling due to semi-coherency of FCC lattices. A nanostructured Pt(Ti) product was formed after long milling time, which contained 44–47 at.% Ti and 53–56 at.% Pt. An ordered PtTi intermetallic was formed by annealing the metastable Pt(Ti) at temperature above 1300 °C. The crystal structure and microstructure of the TiPt phase depended on the milling time, annealing temperature and the cooling rate. The B19 PtTi plate martensite was formed after annealing at 1500 °C and quenching at a cooling rate of 23 °C/min to 200 °C/min for short time milled products. The width of martensite features was smaller at high cooling rate. In PtTi products milled for longer time, no martensitic transformation was observed on cooling the annealed samples. Small amounts of Pt 5 Ti 3 were formed in the powders milled for 16 h or more, followed by annealing at 1500 °C and furnace

  17. The Chip-Scale Atomic Clock - Low-Power Physics Package

    Science.gov (United States)

    2004-12-01

    36th Annual Precise Time and Time Interval (PTTI) Meeting 339 THE CHIP-SCALE ATOMIC CLOCK – LOW-POWER PHYSICS PACKAGE R. Lutwak ...pdf/documents/ds-x72.pdf [2] R. Lutwak , D. Emmons, W. Riley, and R. M. Garvey, 2003, “The Chip-Scale Atomic Clock – Coherent Population Trapping vs...2002, Reston, Virginia, USA (U.S. Naval Observatory, Washington, D.C.), pp. 539-550. [3] R. Lutwak , D. Emmons, T. English, and W. Riley, 2004

  18. The Assessment of a Tutoring Program to Meet CAS Standards Using a SWOT Analysis and Action Plan

    Science.gov (United States)

    Fullmer, Patricia

    2009-01-01

    This article summarizes the use of SWOT (Strengths, Weaknesses, Opportunities, and Threats) analysis and subsequent action planning as a tool of self-assessment to meet CAS (Council for the Advancement of Standards in Higher Education) requirements for systematic assessment. The use of the evaluation results to devise improvements to increase the…

  19. Proceedings of National Avian-Wind Power Planning Meeting, Lakewood, Colorado, July 20-21, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    In recent years, bird deaths in wind power plants within the United States have become an important issue with economic, legal, policy and research dimensions. The National Avian-Wind Power Planning Meeting was convened to focus on the research aspects, particularly to (1) identify and prioritize key issues with respect to bird-wind turbine interactions, (2) define a research agenda to resolve scientific and technical issues, while (3) insuring transferability of results, (4) avoiding duplication and inadequate science, and (5) building consensus on approaches to the research needed to address the issues. About 57 individuals plus various independent scientists with relevant expertise, met in Lakewood, Colorado, on 20-21 July 1994. They reviewed the status of wind power in the USA; developed lists of research questions; reviewed past and ongoing avian research at wind plants in the USA and Europe; discussed general design concepts for avian-wind power research, including both monitoring methods and the Adaptive Resource Management approach; discussed desirable components of an integrated national research program; and identified next steps that should be taken. The meeting Proceedings volume includes a Meeting Summary section covering each of the above topics, plus a more detailed description of the presentations, discussions and conclusions on each topic. Meeting attendees recommended that some of the technical issues identified at this meeting be taken up by a group with broader representation and mandate, including the economic, policy and legal ramifications. The National Wind Coordinating Committee`s Avian Subcommittee may be an appropriate group to carry forward the work begun at this meeting. The overall goal might be to devise a process, incorporating scientific research as a major element, that would allow the wind industry to develop without the occurrence of an unacceptable number of bird deaths.

  20. Making Meetings Work Better.

    Science.gov (United States)

    Standke, Linda

    1978-01-01

    Focusing on the increased use by trainers of off-site facilities for employee training meetings, this article looks at some improvements and the expanding market in the meeting site industry. It also highlights emerging trends in the industry and covers the growth of meeting planning into a profession. (EM)

  1. The Effect of Person Centered Planning Activities on the IEP/Transition Planning Process.

    Science.gov (United States)

    Miner, Craig A.; Bates, Paul E.

    1997-01-01

    A study of 22 students with mental retardation and their families evaluated the impact of person-centered planning activities on several variables related to a student's individual education program/transition planning meeting. Person-centered planning had a significant effect on parent participation in meetings, but not on discussion of…

  2. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  3. Proceedings of the meeting on the planning of the photon factory accelerators, Tsukuba, October 25, 1977

    International Nuclear Information System (INIS)

    Ando, Masami; Ohta, Toshiaki

    1978-03-01

    For Photon Factory Accelerators planned in the National Laboratory for High Energy Physics, designs of a 2.5 GeV electron Linac and a 2.5 GeV storage ring are approaching to the final stage. Contents of the meeting with future users of the synchrotron radiation experimental facilities are presented: the injector and storage ring; and requirements for the beams in soft and hard x-ray regions. (Mori, K.)

  4. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  5. The Role of Public-Sector Family Planning Programs in Meeting the Demand for Contraception in Sub-Saharan Africa.

    Science.gov (United States)

    Bongaarts, John; Hardee, Karen

    2017-06-01

    Commonly used indicators of contraceptive behavior in a population-modern contraceptive prevalence (mCPR), unmet need for contraception, demand for contraception and demand satisfied-are not well-suited for evaluating the progress made by government family planning programs in helping women and men achieve their reproductive goals. Trends in these measures in 26 Sub-Saharan African countries between 1990 and 2014 were examined. Trends in a proposed new indicator, the public-sector family planning program impact score (PFPI), and its relationship to mCPR and the family planning effort score were also assessed. Case studies were used to review public family planning program development and implementation in four countries (Nigeria, Ethiopia, Rwanda and Kenya). The four commonly used indicators capture the extent to which women use family planning and to which demand is satisfied, but shed no direct light on the role of family planning programs. PFPI provides evidence that can be used to hold governments accountable for meeting the demand for family planning, and was closely related to policy developments in the four case-study countries. PFPI provides a useful addition to the indicators currently used to assess progress in reproductive health and family planning programs.

  6. 1990-1991 Marketing Plan. Year II: Planning To Meet the Future.

    Science.gov (United States)

    Turcott, Frances; And Others

    In Maryland, Catonsville Community College's (CCC) 1990-91 marketing plan deals with the community's perceptions of the institution and strategies to improve CCC's image. Both the 1989-90 and 1990-91 plans targeted the same markets for special recruitment strategies; i.e., high school graduates with transfer plans, part-time adult students,…

  7. 77 FR 50157 - Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting

    Science.gov (United States)

    2012-08-20

    ...; HAG 12-0260] Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting AGENCY.... Department of the Interior, Bureau of Land Management (BLM) Eastern Washington Resource Advisory Council... Bureau of Land Management's Eastern Washington and San Juan Resource Management Plan and the U.S. Forest...

  8. 75 FR 4428 - Sunshine Act Meeting Notice

    Science.gov (United States)

    2010-01-27

    ....m. Briefing on Uranium Recovery (Public Meeting). (Contact: Dominick Orlando, 301-415-6749.) This... NUCLEAR REGULATORY COMMISSION [NRC-2010-0002] Sunshine Act Meeting Notice DATES: Weeks of January... Plans (Public Meeting). (Contact: Quynh Nguyen, 301-415-5844.) This meeting will be webcast live at the...

  9. 77 FR 23495 - Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting

    Science.gov (United States)

    2012-04-19

    ...; HAG 12-0164] Notice of Public Meeting, Eastern Washington Resource Advisory Council Meeting AGENCY... 1972, the U.S. Department of the Interior, Bureau of Land Management (BLM) Eastern Washington Resource... of Land Management's Eastern Washington and San Juan Resource Management Plan, and the U.S. Forest...

  10. 77 FR 66478 - Steens Mountain Advisory Council; Meetings

    Science.gov (United States)

    2012-11-05

    ... Management Plan; and planning future meeting agendas, dates, and locations. Any other matters that may... prior to the session. Meeting dates, times, locations, and the duration scheduled for public comment... accommodate necessary business and all who seek to be heard regarding matters before the SMAC. FOR FURTHER...

  11. 25 CFR 1000.44 - What happens if there are insufficient funds to meet the Tribal requests for planning/negotiation...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What happens if there are insufficient funds to meet the Tribal requests for planning/negotiation grants in any given year? 1000.44 Section 1000.44 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENT...

  12. Development Of Frequency Transfer Via Optical Fiber Link at NICT

    Science.gov (United States)

    2008-12-01

    al., 2006 “Comparison between frequency standards in Europe and the USA at the 10-15 uncertainty level,” Metrologia , 43, 109-120. [4] H. Kiuchi, T...M. Hosokawa, 2008, “Evaluation of caesium atomic fountain NICT-CsF1,” Metrologia , 45, 139-148. [12] M. Kumagai, H. Ito, G. Santarelli, C. Locke, J...free-run O ve rla pp in g Al la n D ev ia tio n Averaging time [sec] 40th Annual Precise Time and Time Interval (PTTI) Meeting 100 101 102 103

  13. The "Total Immersion" Meeting Environment.

    Science.gov (United States)

    Finkel, Coleman

    1980-01-01

    The designing of intelligently planned meeting facilities can aid management communication and learning. The author examines the psychology of meeting attendance; architectural considerations (lighting, windows, color, etc.); design elements and learning modes (furniture, walls, audiovisuals, materials); and the idea of "total immersion meeting…

  14. The art of leading meetings.

    Science.gov (United States)

    English, C B

    1987-05-01

    The ability to skillfully lead meetings can contribute to a manager's effectiveness. There are four types of meetings, each serving different needs and requiring different leadership. A manager must know when to hold meetings, what leadership style is appropriate, how and when to use participative management, and how to facilitate a consensus. Considerable planning must be done before a meeting is held. Various leadership and communication skills are required to effectively open, conduct, and close a meeting. Finally, the leader needs to know how to deal with participants who become problems.

  15. 78 FR 21123 - Sunshine Act Meeting

    Science.gov (United States)

    2013-04-09

    ... Fund Losses, Income, and Reserve Ratios for the Restoration Plan. The meeting will be held in the Board... meeting will be Webcast live via the Internet and subsequently made available on-demand approximately one...

  16. 78 FR 57154 - Sunshine Act Meeting

    Science.gov (United States)

    2013-09-17

    ... FEDERAL RETIREMENT THRIFT INVESTMENT BOARD Sunshine Act Meeting TIME AND DATE: 9:00 a.m. (Eastern Time) September 23, 2013. PLACE: 10th Floor Board Meeting Room, 77 K Street NE., Washington, DC 20002... of the Minutes of the August 9, 2013 Board Member Meeting 2. Thrift Savings Plan Activity Reports by...

  17. 75 FR 6413 - Sunshine Act Meeting Notice

    Science.gov (United States)

    2010-02-09

    ... a.m. Briefing on Uranium Recovery (Public Meeting). (Contact: Dominick Orlando, 301-415-6749.) This... NUCLEAR REGULATORY COMMISSION [NRC-2010-0002] Sunshine Act Meeting Notice DATES: Weeks of February.... Briefing on Regional Programs--Programs, Performance, and Future Plans (Public Meeting). (Contact: Richard...

  18. 77 FR 27417 - Sunshine Act Meetings

    Science.gov (United States)

    2012-05-10

    ... Agenda II. Approval of the March 9, 2012 Meeting Minutes III. Program Planning Update and discussion of projects: Strategic Planning Process Discussion on 2013 Statutory Report Selection Process IV. Management...

  19. 75 FR 51275 - National Institute of Mental Health; Notice of Meeting

    Science.gov (United States)

    2010-08-19

    ... U.S.C. App.), notice is hereby given of a meeting of the Subcommittee for Planning the Annual Strategic Plan Updating Process of the Interagency Autism Coordinating Committee (IACC). The Subcommittee... Autism Coordinating Committee (IACC). Type of Meeting: Subcommittee for Planning the Annual Strategic...

  20. Impact of the lung oncology multidisciplinary team meetings on the management of patients with cancer.

    Science.gov (United States)

    Ung, Kim Ann; Campbell, Belinda A; Duplan, Danny; Ball, David; David, Steven

    2016-06-01

    Multidisciplinary team (MDT) meetings are increasingly regarded as a component of multidisciplinary cancer care. We aimed to prospectively measure the impact of MDT meetings on clinicians' management plans for lung oncology patients, and the implementation rate of the meeting recommendations. Consecutive patient cases presented at the weekly lung oncology MDT meetings were prospectively enrolled. Investigators compared the clinicians' management plans pre-meeting with the consensus plans post-meeting. The meeting was considered to have an impact on management plans if ≥1 of the following changes were detected: tumor stage, histology, treatment intent or treatment modality, or if additional investigations were recommended. Investigators reviewed hospital patient records at 4 months to determine if the meeting recommendations were implemented. Reasons for non-implementation were also recorded. Of the 55 eligible cases, the MDT meeting changed management plans in 58% (CI 45-71%; P management plans for lung oncology patients. The majority of MDT recommendations (72%) were implemented into patient care. These findings provide further evidence to support the role of MDT meetings as an essential part of the decision-making process for the optimal multidisciplinary management of patients with cancer. © 2014 Wiley Publishing Asia Pty Ltd.

  1. 75 FR 22100 - Meetings

    Science.gov (United States)

    2010-04-27

    ... (closed to public). 11-2:30 p.m. Planning and Evaluation Committee. 2:30-3 Budget committee. 3-3:30 Ad Hoc... Embassy Suites DC Convention Center Hotel, located at 900 10th Street, NW., Washington, DC 20001. FOR... the draft March 31, 2010 meeting minutes. Budget Committee Report. Planning and Evaluation Committee...

  2. 76 FR 21702 - Meetings

    Science.gov (United States)

    2011-04-18

    ... Technical Programs Committee 1:30-2:15 p.m. Planning and Evaluation Committee 2:30-4 p.m. Ad Hoc Committee...-Noon Presentation on issues for people who are deaf/blind 1:30-3 p.m. Board Meeting ADDRESSES: All... Report. Technical Programs Committee Report. Planning and Evaluation Committee Report. Ad Hoc Committee...

  3. 77 FR 37406 - Sunshine Act; Notice of Meeting

    Science.gov (United States)

    2012-06-21

    ... FEDERAL RETIREMENT THRIFT INVESTMENT BOARD MEETING Sunshine Act; Notice of Meeting TIME AND DATE... Considered Parts Open to the Public 1. Approval of the Minutes of the May 21, 2012 Board Member Meeting... Thrift Advisory Council Meeting. 3. Thrift Savings Plan Activity Report by the Executive Director. a...

  4. 25 CFR 1000.43 - May a Tribe/Consortium use its own resources to meet its self-governance planning and negotiation...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false May a Tribe/Consortium use its own resources to meet its self-governance planning and negotiation expenses? 1000.43 Section 1000.43 Indians OFFICE OF THE ASSISTANT SECRETARY, INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ANNUAL FUNDING AGREEMENTS UNDER THE TRIBAL SELF-GOVERNMENT ACT AMENDMENTS TO THE INDIAN...

  5. Planning and management of uranium mine and mill closures. Proceedings of a technical committee meeting held in Liberec, Czech Republic, 3-6 May 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Technical Committee Meeting on Planning and Management of Uranium Mine and Mill Closures was held in Liberec, Czech Republic from 3 to 6 May 1994. A total of 30 participants from nine countries attended the meeting. Nineteen papers were presented. Most of these papers dealt with the concept of and experiences in planning for and the subsequent decommissioning and rehabilitation of uranium mines and mills in Australia, Canada, Czech Republic, Germany, Romania, Slovenia, Spain and the USA. Two papers discussed the government`s role and relevant regulations related to the closures, decommissioning and remediation of uranium production facilities. Of particular interest to the participants was a non-technical paper presented by the Mayor of the city of Andujar, Spain, describing the negative political and socio-economic impacts associated with closure and decommissioning of an uranium mine/mill facility. The highlights of the meeting were the field visits to the uranium production facilities and rehabilitation programme sites of DIAMO and WISMUT companies, located respectively in Straz, Czech Republic and Koenigstein, Germany. Refs, figs and tabs.

  6. Fifteenth LAMPF users group meeting

    International Nuclear Information System (INIS)

    Cochran, D.R.F.

    1982-03-01

    The Fifteenth LAMPF Users Group Meeting was held November 2-3, 1981 at the Clinton P. Anderson Meson Physical Facility. The program of papers scheduled to be presented was amended to include a Report from Washington by Clarence R. Richardson, US Department of Energy. The general meeting ended with a round-table working group discussion concerning the Planning for a Kaon Factory. Individual items from the meeting were prepared separately for the data base

  7. Head and neck multidisciplinary team meetings: Effect on patient management.

    Science.gov (United States)

    Brunner, Markus; Gore, Sinclair M; Read, Rebecca L; Alexander, Ashlin; Mehta, Ankur; Elliot, Michael; Milross, Chris; Boyer, Michael; Clark, Jonathan R

    2015-07-01

    The purpose of this study was for us to present our findings on the prospectively audited impact of head and neck multidisciplinary team meetings on patient management. We collected clinical data, the pre-multidisciplinary team meeting treatment plan, the post-multidisciplinary team meeting treatment plans, and follow-up data from all patients discussed at a weekly multidisciplinary team meeting and we recorded the changes in management. One hundred seventy-two patients were discussed in 39 meetings. In 52 patients (30%), changes in management were documented of which 20 (67%) were major. Changes were statistically more likely when the referring physician was a medical or radiation oncologist, when the initial treatment plan did not include surgery, and when the histology was neither mucosal squamous cell cancer nor a skin malignancy. Compliance to the multidisciplinary team meeting treatment recommendation was 84% for all patients and 70% for patients with changes in their treatment recommendation. Head and neck multidisciplinary team meetings changed management in almost a third of the cases. © 2014 Wiley Periodicals, Inc.

  8. Informal Planning in Depopulating Rural Areas : A resource-based view on informal planning practices

    NARCIS (Netherlands)

    Syssner, Josefina; Meijer, M.

    2017-01-01

    Planning research has increasingly recognised that planning in depopulating areas differs from planning in growth areas. Several studies have sought to identify planning theories and strategies that are capable of meeting the challenges presented by depopulating areas. However, most of these studies

  9. Air Force Officer Accession Planning: Addressing Key Gaps in Meeting Career Field Academic Degree Requirements for Nonrated Officers

    Science.gov (United States)

    2016-06-09

    C O R P O R A T I O N Research Report Air Force Officer Accession Planning Addressing Key Gaps in Meeting Career Field Academic Degree Requirements...potential performance, and how to include these quality measures in the classification process. The research sponsor asked us to focus on academic ...Andrew P., and James K. Lowe, “Decision Support for the Career Field Selection Process at the US Air Force Academy,” European Journal of Operational

  10. 75 FR 17902 - Western Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2010-04-08

    ... Components Species for Pelagics Fishery Ecosystem Plan 8. Longline fishery meeting 9. Other business 10.... SUMMARY: The Western Pacific Fishery Management Council (Council) will hold meetings of its Pelagics Plan... requirements for operational-level catch and effort data 5. Catch and bycatch effects of large circle hooks in...

  11. A High Performance Frequency Standard and Distribution System for Cassini Ka-Band Experiment

    Science.gov (United States)

    2005-08-01

    Orthogonal Polarization In Anisotropic Dielectric Resonators”, Proceedings of the 2002 IEEE International Frequency Control Symposium , pp. 553-558...2002. [9] G. J. Dick, Rabi T. Wang, Robert Tjoelker, “Design and Progress Report for Compact Cryocooled Sapphire Oscillator "VCSO"”, Proc. 2005 Joint...IEEE FCS/ PTTI. [10] R. Basu, G. J. Dick, Rabi T. Wang,” Novel Design of an All- Cryogenic RF Pound Circuit “,Proc. 2005 Joint IEEE FCS/ PTTI

  12. Official minutes of the eighth INDC meeting

    International Nuclear Information System (INIS)

    Benzi, V.

    1977-06-01

    Among the topics discussed are the following: committee business; neutron and non-neutron nuclear data (reports and recommendations on meetings, on data centres activities including publication cycles and coordination); NDS program; reports of sub-committees; meetings planning and agendas

  13. 23 CFR 710.303 - Planning.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Planning. 710.303 Section 710.303 Highways FEDERAL... ESTATE Project Development § 710.303 Planning. State and local governments conduct metropolitan and statewide planning to develop coordinated, financially constrained system plans to meet transportation needs...

  14. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  15. Three images of interdisciplinary team meetings.

    Science.gov (United States)

    Crepeau, E B

    1994-08-01

    Teams are an essential aspect of health care today, especially in rehabilitation or chronic illness where the course of care is frequently long, complex, and unpredictable. The coordinative function of teams and their interdisciplinary aspects are thought to improve patient care because team members bring their unique professional skills together to address patient problems. This coordination is enacted through the team meeting, which typically results in an integrated care plan. This professional image of team meetings is explicit and addresses the description and provision of care as objective and rational activities. In contrast, the constructed and ritualistic images of health care team meetings are implicit and concern the less objective and rational aspects of planning care. The constructed image pertains to the definitional activity of team members as they try to understand patient troubles and achieve consensus. This process involves the individual clinical reasoning of team members and the collective reasoning of the group. The ritualistic image is that aspect of team meetings in which the team affirms and reaffirms its collective identity. Drawing from field research of geropsychiatric team meetings, this article defines and explicates these images, focusing on the constructed and ritualistic aspects of team meetings and the influence of these images on group function.

  16. Strategic planning in diagnostic imaging: meeting the challenge.

    Science.gov (United States)

    Lexa, Frank J

    2008-02-01

    The 21st century has raised new and significant challenges to the practice of diagnostic imaging. Radiologists will have to navigate a difficult path as they face threats from disruptive technologies, adverse demographic changes, pressures to limit reimbursement both from the public and from the private sectors, increased domestic and crossborder competition, and many others. Success in these trying times will require greater attention to strategic planning if we are to thrive and survive in radiology. Strategic planning and tactical implementation methodologies were reviewed, from Sun Tzu to the present day, for applicability to the needs of modern radiology groups. A framework for developing and implementing strategic plans was constructed to assist radiology leaders and groups in considering the spectrum of tasks, from gathering intelligence, to developing scenarios, to implementing and evaluating tactical plans. Strategy and tactics are too important to be ignored or left to others. They need to be core activities for all radiology leaders. Frameworks can be used to help in providing structure and rigour to strategic planning efforts at the department and group level.

  17. Facilitated IEP Meetings. PHP-c90

    Science.gov (United States)

    PACER Center, 2004

    2004-01-01

    To help special education planning teams reach agreements, the Minnesota Department of Education and the Minnesota Special Education Mediation Service (MNSEMS) provide the option of facilitated IEP meetings. This option is available for IEP (Individualized Education Program), IIIP (Individual Interagency Intervention Plan), and IFSP (Individual…

  18. Meals at medical specialty society annual meetings: a preliminary assessment.

    Science.gov (United States)

    La Puma, John; Schiedermayer, David; Becker, Jennifer

    2003-01-01

    Little isd known about how meals are chosen for medical meetings. We surveyed the annual meeting planners for 20 major specialty societies. Thirteen (65%) responded; all were currently planning their next meeting. Attendance in 2000 was reported at 113,477 physicians, with 2 million planned meals and snacks. No physician was named as responsible for food choices; the meeting planner and staff were primarily responsible for deciding what food to serve, excluding exhibit halls. Twelve (92%) respondents rated "available budget" as the most important factor. "Nutritional guidelines" were rated "very important" by eight of 13 (63%). However, no specific nutritional guidelines could be identified by any planner. All respondents indicated that members would attend a meeting if "healthy" food were the only option. For 2000, 100% of respondents indicated that for each lunch and for each dinner, a dessert had been included. No annual meeting and no planned 2001 meeting excluded potato chips, snack mixes, or candies at breaks; soda pop was offered at each break. Most respondents (89%) relied on a concluding questionnaire about the meeting facilities to evaluate the food. Respondents reported no difference in charges for "special meals," including vegetarian and kosher meals. Physicians may be unaware that some food served at medical meetings may impair learning, with excessive calorie, fat, and carbohydrate consumption. Small changes can improve the quality of food and beverages selected, without increased cost, and provide choices that conform to national nutritional guidelines. Medical meetings should serve flavorful, healthful food.

  19. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  20. Goal planning: a retrospective audit of rehabilitation process and outcome.

    Science.gov (United States)

    Duff, Jane; Evans, Matthew J; Kennedy, Paul

    2004-05-01

    To consider the effectiveness of a goal planning programme for people with spinal cord injury (SCI) and address some of the current evidence gaps in goal setting. Retrospective audit. Consecutive series of 65 newly injured SCI patients. The Needs Assessment Checklist (NAC) has been specifically developed for the SCI population, and is used to assess patient attainment in core rehabilitation areas. A 'Goal Planning Progress' form was also used to specifically detail the goal planning process. Across the 65 patients, 396 goal planning meetings were held with 6176 goals set in total. Seventy-two per cent of the goals set at the first goal planning meeting were achieved by the second meeting. The rate of achievement at subsequent meetings was 68%. Significant differences in the number of planned rehabilitation days, number of goal planning meetings, and goals set were identified between injury categories. Significant positive correlations were found between the number of goals set and achievement, as measured by the NAC, in certain rehabilitation domains. The findings of this study demonstrate that the Needs Assessment and Goal Planning framework is effective in planning SCI rehabilitation. The capacity of this goal planning system to reflect individual need has also been established. Further systematic analyses of this process could potentially lead to more efficient rehabilitation and the identification of care pathways within clinical areas.

  1. MeetingVis: Visual Narratives to Assist in Recalling Meeting Context and Content.

    Science.gov (United States)

    Shi, Yang; Bryan, Chris; Bhamidipati, Sridatt; Zhao, Ying; Zhang, Yaoxue; Ma, Kwan-Liu

    2018-06-01

    In team-based workplaces, reviewing and reflecting on the content from a previously held meeting can lead to better planning and preparation. However, ineffective meeting summaries can impair this process, especially when participants have difficulty remembering what was said and what its context was. To assist with this process, we introduce MeetingVis, a visual narrative-based approach to meeting summarization. MeetingVis is composed of two primary components: (1) a data pipeline that processes the spoken audio from a group discussion, and (2) a visual-based interface that efficiently displays the summarized content. To design MeetingVis, we create a taxonomy of relevant meeting data points, identifying salient elements to promote recall and reflection. These are mapped to an augmented storyline visualization, which combines the display of participant activities, topic evolutions, and task assignments. For evaluation, we conduct a qualitative user study with five groups. Feedback from the study indicates that MeetingVis effectively triggers the recall of subtle details from prior meetings: all study participants were able to remember new details, points, and tasks compared to an unaided, memory-only baseline. This visual-based approaches can also potentially enhance the productivity of both individuals and the whole team.

  2. 24th Low-x Meeting

    CERN Document Server

    2016-01-01

    This meeting follows the similar ones held at DESY, then Saclay (May 1994), Cambridge (July 1995), Durham (June 1996), Madrid (June 1997), Berlin (June 1998), Tel Aviv (June 1999) Oxford (July 2000), Cracow (June 2001), Antwerpen (September 2002), Nafplio (June 2003), Prague (September 2004), Sinaia (June 2005), Lisbon (June 2006), Helsinki (September 2007) Crete (July 2008), Ischia (September 2009), Kavala (June 2010) and Santiago de Compostela (June 2011), Cyprus (June 2012), Israel (June 2013), Japan (June 2014) and Poland (September 2015). The spirit of this series of meetings is to favour fruitful and informal discussions between experimentalists and theorists. Lots of time is used to be given to discussions on new results, hot topics and exciting open problems in QCD at Tevatron and LHC. The meeting is scheduled to start on Monday June 6 in the morning and end on Friday June 10 early agternoon. A tour in the neighborhood is planned for Wednesday June 8 in the afternoon. An optional tour is planned for S...

  3. Social Media Technology and Public Health in Ontario: Findings from a Planning Meeting Exploring Current Practices and Future Research Directions.

    Science.gov (United States)

    Booth, Richard; McMurray, Josephine; Regan, Sandra; Kothari, Anita; Donelle, Lorie; McBride, Susan; Sobel, Annette; Hall, Jodi; Fraser, Robert; Foisey, Lyndsay

    2017-01-01

    In the province of Ontario, many of the public health units (PHUs) now possess and use social media as part of their daily health promotion and communication operations. To explore this topic, a planning meeting was held to generate deeper insights toward the use of these forms of technology for preventative services delivery. The planning meeting was held with 50 participants, comprising representatives from 20 of the 36 PHUs in Ontario, interested academics, students and government representatives. A nominal group technique (NGT) was used to build consensus related to future research needs, as related to public health and social media. Participants generated a range of insights around the use of social media, including the need for: leadership buy-in and resource allocation; social media policy and governance structure; performance measurement and evaluation; practices related to engagement with program recipients and addressing the lack of resources faced by many health units. Future research priorities were also generated, related to evaluating the cost-benefit of social media activities and understanding behaviour change implications. Further research is needed to evaluate the functionality, leadership and competency requirements and impact(s) of these new forms of health communication technology within public health service delivery. Copyright © 2017 Longwoods Publishing.

  4. Meeting demand for family planning within a generation: prospects and implications at country level

    Directory of Open Access Journals (Sweden)

    Yoonjoung Choi

    2015-11-01

    Full Text Available Background: In order to track progress towards the target of universal access to sexual and reproductive health care services of the post-2015 Sustainable Development Goals (SDGs, a measure (demand for family planning satisfied with modern contraceptive methods and a benchmark (at least 75% by 2030 in all countries have been recommended. Objectives: The goal of this study was to assess the prospects of reaching the benchmark at the country level. Such information can facilitate strategic planning, including resource allocation at global and country levels. Design: We selected 63 countries based on their status as least developed according to the United Nations or as a priority country in global family planning initiatives. Using United Nations estimates and projections of family planning indicators between 1970 and 2030, we calculated percent demand for family planning satisfied with modern contraceptive methods for each year and country. We then calculated the annual percentage point changes between 2014 and 2030 required to meet the benchmark. The required rates of change were compared to current projections as well as estimates between 1970 and 2010. Results: To reach the benchmark on average across the 63 countries, demand satisfied with modern methods must increase by 2.2 percentage points per year between 2014 and 2030 – more than double current projections. Between 1970 and 2010, such rapid progress was observed in 24 study countries but typically spanning 5–10 years. At currently projected rates, only 9 of the 63 study countries will reach the benchmark. Meanwhile, the gap between projected and required changes is largest in the Central and West African regions, 0.9 and 3.0 percentage points per year, respectively. If the benchmark is achieved, 334 million women across the study countries will use a modern contraceptive method in 2030, compared to 226 million women in 2014. Conclusions: In order to achieve the component of the SDGs

  5. Meeting demand for family planning within a generation: prospects and implications at country level.

    Science.gov (United States)

    Choi, Yoonjoung; Fabic, Madeleine Short; Hounton, Sennen; Koroma, Desmond

    2015-01-01

    In order to track progress towards the target of universal access to sexual and reproductive health care services of the post-2015 Sustainable Development Goals (SDGs), a measure (demand for family planning satisfied with modern contraceptive methods) and a benchmark (at least 75% by 2030 in all countries) have been recommended. The goal of this study was to assess the prospects of reaching the benchmark at the country level. Such information can facilitate strategic planning, including resource allocation at global and country levels. We selected 63 countries based on their status as least developed according to the United Nations or as a priority country in global family planning initiatives. Using United Nations estimates and projections of family planning indicators between 1970 and 2030, we calculated percent demand for family planning satisfied with modern contraceptive methods for each year and country. We then calculated the annual percentage point changes between 2014 and 2030 required to meet the benchmark. The required rates of change were compared to current projections as well as estimates between 1970 and 2010. To reach the benchmark on average across the 63 countries, demand satisfied with modern methods must increase by 2.2 percentage points per year between 2014 and 2030 - more than double current projections. Between 1970 and 2010, such rapid progress was observed in 24 study countries but typically spanning 5-10 years. At currently projected rates, only 9 of the 63 study countries will reach the benchmark. Meanwhile, the gap between projected and required changes is largest in the Central and West African regions, 0.9 and 3.0 percentage points per year, respectively. If the benchmark is achieved, 334 million women across the study countries will use a modern contraceptive method in 2030, compared to 226 million women in 2014. In order to achieve the component of the SDGs calling for universal access to sexual and reproductive health services

  6. An Automation Planning Primer.

    Science.gov (United States)

    Paynter, Marion

    1988-01-01

    This brief planning guide for library automation incorporates needs assessment and evaluation of options to meet those needs. A bibliography of materials on automation planning and software reviews, library software directories, and library automation journals is included. (CLB)

  7. Expert Meeting: Optimized Heating Systems Using Condensing Boilers and Baseboard Convectors

    Energy Technology Data Exchange (ETDEWEB)

    Arena, L.

    2013-01-01

    On August 11, 2011, in Denver, CO, a Building America Expert Meeting was held in conjunction with the Building America Residential Energy Efficiency Technical Update Meeting, to review and discuss results and future plans for research to improve the performance of hydronic heating systems using condensing boilers and baseboard convectors. A meeting objective was to provide an opportunity for other Building America teams and industry experts to provide feedback and specific suggestions for the planned research.

  8. 76 FR 28784 - HIT Standards Committee's Workgroup Meetings; Notice of Meetings

    Science.gov (United States)

    2011-05-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee's Workgroup Meetings; Notice of... be open to the public via dial-in access only. Name of Committees: HIT Standards Committee's... implementation of the Federal Health IT Strategic Plan, and in accordance with policies developed by the HIT...

  9. 76 FR 50736 - HIT Standards Committee's Workgroup Meetings; Notice of Meetings

    Science.gov (United States)

    2011-08-16

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee's Workgroup Meetings; Notice of... be open to the public via dial-in access only. Name of Committees: HIT Standards Committee's... implementation of the Federal Health IT Strategic Plan, and in accordance with policies developed by the HIT...

  10. 76 FR 14975 - HIT Standards Committee's Workgroup Meetings; Notice of Meetings

    Science.gov (United States)

    2011-03-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee's Workgroup Meetings; Notice of... be open to the public via dial-in access only. Name of Committees: HIT Standards Committee's... implementation of the Federal Health IT Strategic Plan, and in accordance with policies developed by the HIT...

  11. Data management and processing plan, Department of Applied Geodesy

    International Nuclear Information System (INIS)

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL

  12. Determinants of treatment plan implementation in multidisciplinary team meetings for patients with chronic diseases: a mixed-methods study.

    Science.gov (United States)

    Raine, Rosalind; Xanthopoulou, Penny; Wallace, Isla; Nic A' Bháird, Caoimhe; Lanceley, Anne; Clarke, Alex; Livingston, Gill; Prentice, Archie; Ardron, Dave; Harris, Miriam; King, Michael; Michie, Susan; Blazeby, Jane M; Austin-Parsons, Natalie; Gibbs, Simon; Barber, Julie

    2014-10-01

    Multidisciplinary team (MDT) meetings are assumed to produce better decisions and are extensively used to manage chronic disease in the National Health Service (NHS). However, evidence for their effectiveness is mixed. Our objective was to investigate determinants of MDT effectiveness by examining factors influencing the implementation of MDT treatment plans. This is a proxy measure of effectiveness, because it lies on the pathway to improvements in health, and reflects team decision making which has taken account of clinical and non-clinical information. Additionally, this measure can be compared across MDTs for different conditions. We undertook a prospective mixed-methods study of 12 MDTs in London and North Thames. Data were collected by observation of 370 MDT meetings, interviews with 53 MDT members, and from 2654 patient medical records. We examined the influence of patient-related factors (disease, age, sex, deprivation, whether their preferences and other clinical/health behaviours were mentioned) and MDT features (as measured using the 'Team Climate Inventory' and skill mix) on the implementation of MDT treatment plans. The adjusted odds (or likelihood) of implementation was reduced by 25% for each additional professional group represented at the MDT meeting. Implementation was more likely in MDTs with clear goals and processes and a good 'Team Climate' (adjusted OR 1.96; 95% CI 1.15 to 3.31 for a unit increase in Team Climate Inventory (TCI) score). Implementation varied by disease category, with the lowest adjusted odds of implementation in mental health teams. Implementation was also lower for patients living in more deprived areas (adjusted odds of implementation for patients in the most compared with least deprived areas was 0.60, 95% CI 0.39 to 0.91). Greater multidisciplinarity is not necessarily associated with more effective decision making. Explicit goals and procedures are also crucial. Decision implementation should be routinely monitored to

  13. 76 FR 9742 - Agenda and Notice of Public Meeting of the Vermont Advisory Committee

    Science.gov (United States)

    2011-02-22

    ... Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that briefing and planning... of the planning meeting is to plan future activities. Members of the public are entitled to submit... below. Persons who are deaf or hearing-impaired who will attend the meetings and require the services of...

  14. 76 FR 16378 - Agenda and Notice of Public Meeting of the Vermont Advisory Committee

    Science.gov (United States)

    2011-03-23

    ... Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that briefing and planning... of the planning meeting is to plan future activities. Members of the public are entitled to submit... below. Persons who are deaf or hearing-impaired who will attend the meetings and require the services of...

  15. 78 FR 4462 - Sunshine Act; Meeting Notice

    Science.gov (United States)

    2013-01-22

    ... goals for 2013 5. Panel presentation and discussion on Succession Planning and Leadership Development... comment 7. Consider and act on other business 8. Consider and act on motion to adjourn the meeting... comment 8. Consider and act on other business 9. Consider and act on adjournment of meeting Institutional...

  16. Infrastructure Area Simplification Plan

    CERN Document Server

    Field, L.

    2011-01-01

    The infrastructure area simplification plan was presented at the 3rd EMI All Hands Meeting in Padova. This plan only affects the information and accounting systems as the other areas are new in EMI and hence do not require simplification.

  17. 75 FR 54299 - Agenda and Notice of Public Meeting of the Massachusetts State Advisory Committee

    Science.gov (United States)

    2010-09-07

    .... Commission on Civil Rights and the Federal Advisory Committee Act, that briefing and planning meetings of the... Advisory Committee to continue its work on English Language Learners. The purpose of the planning meeting... COMMISSION ON CIVIL RIGHTS Agenda and Notice of Public Meeting of the Massachusetts State Advisory...

  18. Marketing plan

    OpenAIRE

    Jantunen, Essi; Hellman, Annika

    2012-01-01

    The aim of this bachelor’s thesis was to draw up an efficient marketing plan for Pohjolan Vihreä Polku Oy, which offers meeting and nature activity services. The company was in a process of conversion and needed a structured marketing plan. The objectives of the company were perceived through severe research. The main purposes of the marketing plan were to raise the visibility of the company and increase its clientele. The proposed marketing actions are also to be used to improve the company’...

  19. Integrated Instrumentation and Control Upgrade Plan

    International Nuclear Information System (INIS)

    Wilkinson, D.; Sun, B.; Wray, L.; Smith, J.

    1992-02-01

    This document presents the first industry-wide integrated research and development plan to support upgrading instrumentation and control (I ampersand C) systems in nuclear power plants in the United States. The plan encompasses both solving obsolescence problems and introducing modern I ampersand C technology into the industry. Accomplishing this plan will provide the technological base to modernize existing plants, as well as bridge the gap to meet Advanced Light Water Reactor (ALWR) requirements for modern I ampersand C systems. This plan defines Research and Development tasks to meet the identified needs for the following technical elements: Instrumentation, Control and Protection, Man-Machine Support Systems, Maintenance, Communications, Verification and Validation, and Specifications and Standards

  20. Standing Concertation Committee - Ordinary Meeting on 15 January 2005

    CERN Multimedia

    2005-01-01

    This meeting was devoted to the main topics summarised below. Follow-up from the meetings of the Finance Committee and Council in December 2004 The Chairman welcomed two new SCC members representing the Staff Association: Véronique Paris and Gianni Deroma. Expressing their best wishes for the New Year, the members of the SCC took note of a report by the Chairman on the outcome of these Committee meetings and of the Director-General's staff meeting on 10 January 2005, and discussed a number of internal follow-up actions. Work planning of the SCC & TREF The SCC agreed its calendar of ordinary sessions and its draft work planning for the first half of 2005, subject to including a number of matters outstanding from 2004. The Committee discussed internal preparation for the next meeting of TREF on 4 & 5 April devoted to items concerning the current 5-Yearly Review. The SCC also took note of the provisional scheduling of TREF meetings from May to September, which will be settled by...

  1. Sixth meeting of the ITPA Topical Group on Diagnostics

    International Nuclear Information System (INIS)

    Donne, A.J.H.; Costley, A.E.

    2004-01-01

    The Sixth Meeting of the International Tokamak Physics Activities (ITPA) Topical Group (TG) on Diagnostics was held at JAERI, Naka from 19-21 February 2004. This meeting was combined with a Progress Meeting on ITER/BPX (burning plasma experiment) relevant diagnostic developments on-going in Japan. For the first time, ITPA members from China, as well as observers from South Korea, attended. In addition, an associated sub-meeting was held at General Atomics, San Diego, 23-24 April, immediately after the 15th Topical Conference on High Temperature Plasma Diagnostics. At the sub-meeting a special one-day session was devoted to issues related to beam-aided spectroscopy. In total more than 50 participants attended the meetings and all ITER partners were represented. The key topics reviewed and discussed at the TG meeting were: (i) the overall status of diagnostics developments for ITER, (ii) the progress in the research on the designated high priority topics, (iii) the progress with some key ITER/BPX-relevant diagnostic developments ongoing in the ITPA participant laboratories, (iv) the progress and plans for the work of the specialist working groups, (v) the status and plans for the International Diagnostic Database

  2. 15 CFR 23.3 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Plan. 23.3 Section 23.3 Commerce and... MISSING CHILDREN § 23.3 Plan. (a) The Department of Commerce will supplement and expand the national... biannual meetings of departmental representatives to discuss the current plan and recommendations for...

  3. 78 FR 59648 - Bureau of Economic Analysis Advisory Committee Meeting

    Science.gov (United States)

    2013-09-27

    ... new and rapidly growing economic activities arising from innovative and advancing technologies, and... meeting is open to the public. Because of security procedures, anyone planning to attend the meeting must...

  4. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  5. Education plan

    International Nuclear Information System (INIS)

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  6. 23 CFR 1200.25 - Improvement plan.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Improvement plan. 1200.25 Section 1200.25 Highways... Implementation and Management of the Highway Safety Program § 1200.25 Improvement plan. If a review of the Annual... improvement plan. This plan will detail strategies, program activities, and funding targets to meet the...

  7. 75 FR 71714 - National Institute of Mental Health; Notice of Meeting

    Science.gov (United States)

    2010-11-24

    ... (IACC) Subcommittee for Planning the Annual Strategic Plan Updating Process. The purpose of the Subcommittee meeting is to discuss the updating of the IACC Strategic Plan for Autism Spectrum Disorder... Planning the Annual Strategic Plan Updating Process. Date: December 3, 2010. Time: 10 a.m. to 4 p.m...

  8. 77 FR 16818 - Sunshine Act Meeting

    Science.gov (United States)

    2012-03-22

    ...: Commission Meeting--Open to the Public Matters To Be Considered 1. Decisional Matter: Fiscal Year 2012 Operating Plan. 2. Briefing Matter: Sec. 1112: Lab Withdrawal, Codification & Audit Provisions. A live...

  9. Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting (24th) Held in McLean, VA on December 1-3, 1992

    Science.gov (United States)

    1993-06-01

    additional source. For the past three years VNIIFTRI (Mendeleevo, Moscow Region, Russian Federation) and some other Russian time laboratories have used...Russian-built GLONASS navigation receivers for time 47 comparisons. Since June 1991, VNIIFTRI has operated a commercial CPS time receiver on loan from...the BIPM. Since February 1992, the BIPM has operated Russian GLONASS receiver on loan from the VNIIFTRI . This provides, for the first time, an

  10. 75 FR 66114 - National Institute of Mental Health; Notice of Meeting

    Science.gov (United States)

    2010-10-27

    ... Planning the Annual Strategic Plan Updating Process. Date: November 19, 2010. Time: 8 a.m. to 11 a.m... Strategic Plan Updating Process of the Interagency Autism Coordinating Committee (IACC). The purpose of the Subcommittee meeting is to plan the process for updating the IACC Strategic Plan for Autism Spectrum Disorder...

  11. 77 FR 65191 - HIT Policy Committee Advisory Meeting; Notice of Meeting

    Science.gov (United States)

    2012-10-25

    ... consistent with the Federal Health IT Strategic Plan and that includes recommendations on the areas in which... will be held on November 7, 2012, from 10:00 a.m. to 3:00 p.m./Eastern Time. Location: Omni Shoreham... background material available to the public no later than two (2) business days prior to the meeting. If ONC...

  12. ACCU Meeting

    CERN Multimedia

    2003-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 10 September 2003 At 9:15 a.m. in room 60-6-002 1. Chairman's remarks 7. Equal Opportunities Commission 2. Adoption of the agenda 8. Registration plans for portables 3. Minutes of the previous meeting 9. Reports from ACCU representatives on other committees 4. Matters arising 10. Users' Office news 5. News from the CERN Management 11. Any Other Business 6. The Press Office 12. Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Norway H. Helstrup (73601) Belgium G. Wilquet (74664) Poland Z. Hajduk (75917) Bulgar...

  13. ACCU Meeting

    CERN Multimedia

    2003-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 10 September 2003 At 9:15 a.m. in room 60-6-002 1. Chairman's remarks 8. Registration plans for portables 2. Adoption of the agenda 9. Reports from ACCU representatives 3. Minutes of the previous meeting on other committees 4. Matters arising 10. Users' Office news 5. News from the CERN Management 11. Any Other Business 6. The Press Office 12. Agenda for the next meeting 7. Equal Opportunities Commission Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): AustriaW. Adam (71661) Norway H. Helstrup (73601) Belgium G. Wilquet (74664) Poland Z. Hajduk (75917) Bulgari...

  14. 75 FR 34740 - Sunshine Act Meeting

    Science.gov (United States)

    2010-06-18

    ... resolution re: Final Rule: Temporary Liquidity Guarantee Program. Memorandum re: Deposit Insurance Fund Loss, Income and Reserve Ratio Projection Update for the Restoration Plan. The meeting will be held in the...

  15. 78 FR 54925 - Audit Committee Meeting of The Board of Directors; Sunshine Act Meeting

    Science.gov (United States)

    2013-09-06

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Audit Committee Meeting of The Board of Directors; Sunshine.... Executive Session With Internal Audit Director III. Title Change of the Internal Audit Director IV. Executive Session With Officers: Pending Litigation V. FY14 Risk Assessment & Internal Audit Plan VI...

  16. 78 FR 16715 - National Council on Federal Labor-Management Relations Meeting

    Science.gov (United States)

    2013-03-18

    ... functions listed in Section 1(b) of the Executive Order. The meetings are open to the public. Please contact... OFFICE OF PERSONNEL MANAGEMENT National Council on Federal Labor-Management Relations Meeting... Federal Labor-Management Relations plans to meet on the following date-- Wednesday, May 15, 2013. The...

  17. 76 FR 79754 - Twelfth Meeting: RTCA Special Committee 220, Automatic Flight Guidance and Control

    Science.gov (United States)

    2011-12-22

    ... technologies Administrative items (meeting schedule, location, and next meeting agenda) Any other business... 2 status--progress, issues and plan Review of WG 3 status--progress, issues and plans Review action.... Issued in Washington, DC, on December 15, 2011. Robert L. Bostiga, Manager, Business Operations Branch...

  18. 75 FR 59731 - National Institute of Mental Health; Notice of Meeting

    Science.gov (United States)

    2010-09-28

    ... Planning the Annual Strategic Plan Updating Process. Date: October 6, 2010. Time: 9 a.m. to 12 p.m. Eastern... Strategic Plan Updating Process of the Interagency Autism Coordinating Committee (IACC). The purpose of the Subcommittee meeting is to plan the process for updating the IACC Strategic Plan for Autism Spectrum Disorder...

  19. 76 FR 9742 - Agenda and Notice of Public Meeting of the New Jersey State Advisory Committee

    Science.gov (United States)

    2011-02-22

    .... Commission on Civil Rights and the Federal Advisory Committee Act (FACA), that briefing and planning meetings... of the planning meeting is to plan future activities. The purpose of the press conference is to... contact the ERO. See contact information below. Persons who are deaf or hearing-impaired who will attend...

  20. 76 FR 22677 - Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2011-04-22

    ... Groundfish Management Team (GMT). The meeting is open to the public. DATES: The conference call will be held... the Groundfish Management Team to review the developing Ecosystem Fishery Management Plan. The GMT... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National...

  1. 20 CFR 631.50 - Substate plan.

    Science.gov (United States)

    2010-04-01

    ... THE JOB TRAINING PARTNERSHIP ACT Substate Programs § 631.50 Substate plan. (a) In order to receive an...)). (g) If a substate grantee fails to meet the requirements for plan submission and approval found in...

  2. Minutes of the IFMIF technical meeting

    International Nuclear Information System (INIS)

    Nakamura, H.; Takeda, M.; Ida, M.; Maebara, S.; Yutani, T.; Sugimoto, M.

    2004-03-01

    The IFMIF Technical Meeting was held on December 4-5, 2003 at Shiran-kaikan, Kyoto University. The main objectives are 1) to finalize the Comprehensive Design Report (CDR), 2) to discuss IFMIF cost and organization, 3) to review technical status of major systems, transition phase activities and EVEDA plan. This report presents a brief summary of the results of the meeting. Agenda, participants list and presentation materials are attached as Appendix. (author)

  3. Organization and planning of conferences

    International Nuclear Information System (INIS)

    Hudson, S.R.

    1976-05-01

    The author uses as an example of conference planning The First International Topical Conference on Electron Beam Research and Technology which was held in Albuquerque, New Mexico, November 3-6, 1975. Guidelines are given through all phases of planning up to and during the meeting

  4. 77 FR 776 - Agenda and Notice of Public Meeting of the Connecticut Advisory Committee

    Science.gov (United States)

    2012-01-06

    .... Commission on Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that a planning... convene at 12:00 noon (EST) Friday, January 13, 2012. The purpose of the planning meeting is to work to... COMMISSION ON CIVIL RIGHTS Agenda and Notice of Public Meeting of the Connecticut Advisory...

  5. ANS [American Nuclear Society] topical meeting on radiological accidents: Perspectives and emergency planning: Proceedings

    International Nuclear Information System (INIS)

    1987-03-01

    The increasing use of radioactive materials and the increasing public concern about possible accidents involving these materials has led to greater emphasis on preparing for such emergencies. The ANS Topical Meeting on Radiological Accidents - Perspectives and Emergency Planning provided a review of experiences with radiological accidents. The meeting covered some of the most important aspects of radiological accidents. Papers were presented which dealt with radiological accident experience. Technical response to accidents is of primary interest to many in the nuclear community; most of the papers submitted fell into this area. So many of these papers dealt with the use of computers in response that a session on that topic was arranged. A very significant impact of most radiological accidents is the cost, especially the cost of cleanup. There were papers on what is known about costs and associated current topics, such as modification and extension of the Price-Anderson Act. At least as important as the technical response to accidents is how society attempts to deal with them. A session on institutional issues was included to discuss how governments and other organizations respond to and deal with accidents. Medical effects of accidents are of great concern to the public. Invited papers to review the effects of high doses of radiation as well as very low doses were included in that session. Although the nuclear industry has an excellent safety record, this fact often does not agree with the public perception of the industry. The final session explored the public response to and perception of radiological emergencies and accidents. This subject will ultimately determine the future use of radioactive materials in this country

  6. Collaborative Lesson Planning as Professional Development for Beginning Primary Teachers

    Science.gov (United States)

    Bauml, Michelle

    2014-01-01

    This qualitative case study describes how one beginning primary grade teacher benefited from collaborative lesson-planning meetings with her grade-level colleagues. The teacher accumulated knowledge of curriculum, pedagogy, and professional contexts as she participated in planning meetings each week during her first year of teaching. Furthermore,…

  7. 75 FR 48723 - Meeting Announcement: Neotropical Migratory Bird Conservation Advisory Group

    Science.gov (United States)

    2010-08-11

    ... call to discuss strategic planning and communication, budget and legislation updates, and other topics... . The agenda of this meeting will include strategic planning, strategic communication, and budget and...

  8. Summary of the first meeting of ASEAN Network of Regulatory Bodies on Atomic Energy (ASEANTOM)

    International Nuclear Information System (INIS)

    Siriratana Biramontri, Pantip Ampornrat

    2013-01-01

    The 1st Meeting of ASEAN Network of Regulatory Bodies on Atomic Energy (ASEANTOM) was organized in Phuket, Thailand on 3 - 4 September, 2013. The meeting was held on annually basis following the Meeting to Finalize the Term of Reference (TOR) in Bangkok, Thailand on 29 August, 2012. The objective of the meeting is to review and finalize TOR, and to set up the action plan of ASEANTOM. The action plan is an expected outcome of the meeting. The Meeting consisted of 41 participants from IAEA and ASEAN Member States (AMS), namely, Cambodia, Laos, Singapore, Indonesia, Malaysia, Myanmar, Philippines, Vietnam and Thailand. Only Brunei Darussalam could not attend the Meeting. Participant's organizations were regulatory body or relevant authorities, and Ministry of Foreign Affairs.

  9. 77 FR 33458 - Sunshine Act Meeting

    Science.gov (United States)

    2012-06-06

    ... Minutes for the Meeting of May 24, 2012. Draft Advisory Opinion 2012-17: Red Blue T LLC, Armour Media, Inc... Democratic Central Committee (A09-07). Management and Administrative Matters. Individuals who plan to attend...

  10. 75 FR 68755 - Agenda and Notice of Public Meeting of the Kansas Advisory Committee

    Science.gov (United States)

    2010-11-09

    ... Committee (SAC) orientation and planning meeting of the Kansas Advisory Committee to the Commission will..., 2010. The purpose of this meeting is to provide SAC orientation and continue planning a civil rights... impairments may also follow the proceedings by first calling the Federal Relay Service at 1-800-977-8339 and...

  11. Summary of the eleventh meeting of the ITER diagnostic expert group

    International Nuclear Information System (INIS)

    Costley, A.E.; Donne, A.J.H.

    1999-01-01

    The main technical objectives of the meeting were (i) to review and update the measurement capabilities to meet the anticipated needs of the ITER-FEAT; (ii) to review the progress and plans in meeting the goals of the voluntary R and D tasks; and (iii) to hear reports of ITER relevant diagnostic developments

  12. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  13. Standing Concertation Committee - Ordinary Meeting on 26 May 2004

    CERN Document Server

    2004-01-01

    Original: English This meeting was devoted to the main topics summarised below. Preparation for the 5-Yearly Review 2005 The SCC took note of the final version of the Management's document 'Preparation for the 5-Yearly Review and Work Planning of TREF', which took account of earlier discussions at the meetings of TREF and the SCC in May. Once approved by the Council in June, this document will be the basis for the forthcoming 5-Yearly Review of employment conditions, which will be launched this autumn. The SCC then held a first discussion on the internal work planning for the 5-Yearly Review and, in particular, the setting up of study teams in order to start preparatory work on the various issues. It was agreed to resume discussion of this topic at the next meeting on the basis of HR study teams, in the framework of a comprehensive work planning of the SCC's activities foreseen until the end of 2005. CERN Health Insurance Scheme (CHIS) - Confidential declaration of family situation The Committee took note...

  14. Public Participation Plan

    International Nuclear Information System (INIS)

    1993-07-01

    The purpose of this Public Participation Plan is to describe the US Department of Energy's (DOE) plan for involving the public in the decision-making process for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The plan describes how the DOE will meet the public participation requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, as amended, and of the National Environmental Policy Act (NEPA) of 1969. It includes the UMTRA Project Office plans for complying with DOE Order 5440.1D and for implementing the DOE's Public Participation Policy for Environmental Restoration and Waste Management (1992) and Public Participation Guidance for Environmental Restoration and Waste Management (1993)

  15. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  16. 77 FR 53179 - North Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2012-08-31

    .... SUMMARY: The North Pacific Fishery Management Council's (NPFMC) Crab Plan Team (CPT) will meet in Seattle... Pacific Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS..., WA. Council address: North Pacific Fishery Management Council, 605 W. 4th Avenue, Suite 306...

  17. 78 FR 20616 - Western Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2013-04-05

    ... Pacific Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS.... SUMMARY: The Western Pacific Fishery Management Council (Council) will hold meeting of its Pelagics Plan... the Council Pelagics Conference Room to discuss the following agenda items: Tuesday, April 23, 2013, 8...

  18. Twelfth meeting of the ITER physics expert group on diagnostics

    International Nuclear Information System (INIS)

    Costley, A.E.; Donne, A.J.H.

    2000-01-01

    The main technical objectives of the meeting were to review the present status of ITER and to determine any required changes in the specifications for plasma measurements; to review the progress and develop plans for meeting the goals of the voluntary R and D tasks approved by the ITER Physics Committee within the Parties; to review and plan the work of the five specialists electronic working groups, and to hear reports of ITER relevant diagnostic developments in the Party Laboratories and assess their possible application to ITER

  19. 77 FR 37376 - Agenda and Notice of Public Meeting of the Montana Advisory Committee

    Science.gov (United States)

    2012-06-21

    ... Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that a planning meeting of the..., Billings, MT 59101. The purpose of the planning meeting is to discuss civil rights issues in the state and... Mountain Regional Office at the above email or street address. Deaf or hearing-impaired persons who will...

  20. Climate plan 2004; Plan climat 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO{sub 2} each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  1. 78 FR 14153 - Advisory Council on Transportation Statistics; Meeting

    Science.gov (United States)

    2013-03-04

    ...., Washington, DC. The Bureau of Transportation Statistics (BTS) will reschedule the meeting for a future date. Currently, BTS is developing a draft agenda. The following is a summary of the draft meeting agenda: (1... performance measures; (4) Update on BTS data programs and future plans (5) Council Members review and...

  2. 77 FR 57580 - Notice of Public Meeting; Wyoming Resource Advisory Council

    Science.gov (United States)

    2012-09-18

    ...; telephone 307-775-6014; email [email protected] . Persons who use a telecommunications device for the deaf (TDD... Basin, and follow up from previous meetings on planning. All RAC meetings are open to the public with...

  3. Improving Family Meetings in Intensive Care Units: A Quality Improvement Curriculum.

    Science.gov (United States)

    Gruenewald, David A; Gabriel, Michelle; Rizzo, Dorothy; Luhrs, Carol A

    2017-07-01

    Family meetings in the intensive care unit are associated with beneficial outcomes for patients, their families, and health care systems, yet these meetings often do not occur in a timely, effective, reliable way. The Department of Veterans Affairs Comprehensive End-of-Life Care Implementation Center sponsored a national initiative to improve family meetings in Veterans Affairs intensive care units across the United States. Process measures of success for the initiative were identified, including development of a curriculum to support facility-based quality improvement projects to implement high-quality family meetings. Identified curriculum requirements included suitability for distance learning and applicability to many clinical intensive care units. Curriculum modules were cross-mapped to the "Plan-Do-Study-Act" model to aid in planning quality improvement projects. A questionnaire was e-mailed to users to evaluate the curriculum's effectiveness. Users rated the curriculum's effectiveness in supporting and achieving aims of the initiative as 3.6 on a scale of 0 (not effective) to 4 (very effective). Users adapted the curriculum to meet local needs. The number of users increased from 6 to 17 quality improvement teams in 2 years. All but 3 teams progressed to implementation of an action plan. Users were satisfied with the effectiveness and adaptability of a family-meeting quality improvement curriculum to support implementation of a quality improvement project in Veterans Affairs intensive care units. This tool may be useful in facilitating projects to improve the quality of family meetings in other intensive care units. ©2017 American Association of Critical-Care Nurses.

  4. Strategic Human Resource Planning in Academia

    Science.gov (United States)

    Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan

    2009-01-01

    A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…

  5. Proceedings of National Avian-Wind Power Planning Meeting IV

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Avian Subcommittee

    2001-05-01

    OAK-B135 The purpose of the fourth meeting was to (1) share research and update research conducted on avian wind interactions (2) identify questions and issues related to the research results, (3) develop conclusions about some avian/wind power issues, and (4) identify questions and issues for future avian research.

  6. 77 FR 22286 - Western Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2012-04-13

    ... Pacific Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS.... SUMMARY: The Western Pacific Fishery Management Council (Council) will hold a meeting of its Pelagics Plan... pelagics annual report module changes 4. American Samoa annual report module changes 5. Summary of current...

  7. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER co-ordinated technical activities project board took place in Tokyo, Japan, on 21 January 2002, coinciding with the second Negotiators meeting (N2). Twelve participants, project board members and experts from Canada, European Union, the Russian Federation and the international team attended the meeting. The project board agreed to provide an R and D plan by June 2002, to be linked with the procurement allocation, for the period following the CTA. The ITER International Team Leader developed a proposal on establishing the working groups for drafting technical specifications for the most urgent procurement items

  8. 76 FR 72001 - Notice of Public Meeting, Albuquerque District Resource Advisory Council Meeting, New Mexico

    Science.gov (United States)

    2011-11-21

    ... management in New Mexico. Planned agenda items include a welcome and introduction of new Council members... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNMA00000.L12200000.DF0000] Notice of... Management, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy...

  9. Notification of upcoming AGU Council meeting

    Science.gov (United States)

    Williams, Billy

    2012-10-01

    The AGU Council will meet on Sunday, 2 December 2012, at the InterContinental Hotel in San Francisco, Calif. The meeting, which is open to all AGU members, will include discussions of AGU's new Grand Challenge Project (a project that will be introduced to members at the 2012 Fall Meeting), the proposed AGU scientific ethics policy, publishing strategies, future plans for honors and recognition, and leadership transition as new members join the Council. This year the Council experimented with a new approach to conducting business. By holding virtual meetings throughout the year, Council members have been able to act in a more timely manner and provide input on important membership and science issues on the Board of Directors' agenda. The Council Leadership Team—an elected subset of the Council—also experimented with a new approach, meeting every month to keep moving projects forward. This approach has increased communication and improved effectiveness in Council decision making.

  10. Public comments and responses to the 1993 Hanford cleanup five-year plan

    International Nuclear Information System (INIS)

    1993-08-01

    In March 1993, the US Department of Energy, Richland Operations Office (DOE-RL) published its annual Site-Specific Five-Year Plan. The Site-Specific Plan is published to inform the public about the background, status, and plans for Environmental Restoration (ER) and Waste Management (WM) activities at the Hanford site. It is the only document that seeks to bring all ER and WM elements together in one document. The Site-Specific Plan is a companion document to the National Five-Year Plan that deals with all the sites within the DOE complex on a summary level. This Response to Comments document does not try to address every question or concern raised during the public comment period. Some questions were outside the scope of the Five-Year Plan, some we could not decipher, others were variations of the same question. The initial round of public meetings was held in Portland, Oregon, and Seattle, Pasco, and Olympia, Washington. At the request of the Oregon Department of Energy (ODOE) and the Washington State Department of Ecology (Ecology), a second round of meetings was held in Portland and Olympia. Both agencies felt that the first two meetings were held with too little advance notice, and before the Plan could be distributed. Once the public meetings were over and the comment period closed, we then compiled the public comments, largely from audio tapes of the meetings. Individual functions within Hanford were asked to consider and respond to the comments

  11. 78 FR 12799 - Advisory Committee for Innovation Corps; Notice of Meeting; Correction

    Science.gov (United States)

    2013-02-25

    ... announcing a meeting of the Advisory Committee for Innovation Corps. The location and time of the business meeting are updated to reflect the accurate plans. In accordance with the Federal Advisory Committee Act...

  12. 75 FR 20985 - North Pacific Fishery Management Council; Public Meeting

    Science.gov (United States)

    2010-04-22

    .... SUMMARY: The North Pacific Fishery Management Council's Crab Plan Team (CPT) will meet in Alaska on May 10... Pacific Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS... Room - May 14. Council address: North Pacific Fishery Management Council, 605 W. 4th Avenue, Suite 306...

  13. Writing a group practice business plan.

    Science.gov (United States)

    Reiboldt, J M

    1999-07-01

    A business plan offers group practices a blueprint to accomplish a variety of goals, such as securing capital, marketing the practice's services, recruiting new employees, developing a strategic plan or a budget, or planning for growth. A business plan should be informative, specific, and visionary. Elements that every business plan should address are a mission statement, strategy, planning, management information, and action scheme. A business plan should include certain information in a prescribed order. By writing a realistic business plan, group practices can work more efficiently and minimize the risk of not meeting their financial projections.

  14. Committed emissions from existing and planned power plants and asset stranding required to meet the Paris Agreement

    Science.gov (United States)

    Pfeiffer, Alexander; Hepburn, Cameron; Vogt-Schilb, Adrien; Caldecott, Ben

    2018-05-01

    Over the coming decade, the power sector is expected to invest ~7.2 trillion USD in power plants and grids globally, much of it into CO2-emitting coal and gas plants. These assets typically have long lifetimes and commit large amounts of (future) CO2 emissions. Here, we analyze the historic development of emission commitments from power plants and compare the emissions committed by current and planned plants with remaining carbon budgets. Based on this comparison we derive the likely amount of stranded assets that would be required to meet the 1.5 °C–2 °C global warming goal. We find that even though the growth of emission commitments has slowed down in recent years, currently operating generators still commit us to emissions (~300 GtCO2) above the levels compatible with the average 1.5 °C–2 °C scenario (~240 GtCO2). Furthermore, the current pipeline of power plants would add almost the same amount of additional commitments (~270 GtCO2). Even if the entire pipeline was cancelled, therefore, ~20% of global capacity would need to be stranded to meet the climate goals set out in the Paris Agreement. Our results can help companies and investors re-assess their investments in fossil-fuel power plants, and policymakers strengthen their policies to avoid further carbon lock-in.

  15. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  16. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  17. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  18. Project planning of Gen-IV sodium cooled fast reactor technology

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-15

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.

  19. Project planning of Gen-IV sodium cooled fast reactor technology

    International Nuclear Information System (INIS)

    Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.

    2013-05-01

    The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety

  20. 14 CFR 151.3 - National Airport Plan.

    Science.gov (United States)

    2010-01-01

    ... provide a system of public airports adequate to anticipate and meet the needs of civil aeronautics. (b) If... in the National Airport Plan. Only work on an airport included in the current Plan is eligible for... not required to proceed with planning or development of an airport included in the National Airport...

  1. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  2. Care planning at home: a way to increase the influence of older people?

    Directory of Open Access Journals (Sweden)

    Helene Berglund

    2012-08-01

    Full Text Available Introduction: Care-planning meetings represent a common method of needs assessment and decision-making practices in elderly care. Older people's influence is an important and required aspect of these practices. This study's objective was to describe and analyse older people's influence on care-planning meetings at home and in hospital. Methods: Ten care-planning meetings were audio-recorded in the older people's homes and nine were recorded in hospital. The study is part of a project including a comprehensive continuum-of-care model. A qualitative content analysis was performed.  Results: Care-planning meetings at home appeared to enable older people's involvement in the discussions. Fewer people participated in the meetings at home and there was less parallel talking. Unrelated to the place of the care-planning meeting, the older people were able to influence concerns relating to the amount of care/service and the choice of provider. However, they were not able to influence the way the help should be provided or organised.  Conclusion: Planning care at home indicated an increase in involvement on the part of the older people, but this does not appear to be enough to obtain any real influence. Our findings call for attention to be paid to older people's opportunities to receive care and services according to their individual needs and their potential for influencing their day-to-day provision of care and service.

  3. Proceedings of the 24th NSRR technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Uetsuka, Hiroshi; Fuketa, Toyoshi; Suzuki, Motoe [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    2001-09-01

    The 24th NSRR Technical Review Meeting was held at Tranomon Pastoral, Tokyo, on November 13 and 14, 2000. The purpose of the meeting was to present and discuss the recent progress of the NSRR program and other LWR fuel safety researches at JAERI. Twenty-one papers, including five by foreign institutes, were presented and discussed regarding fuel behavior during normal operation, reactivity initiated accident (RIA) and loss-of-coolant accident (LOCA) and FP release behavior during severe accident. The meeting was a great help in planning future research and promoting research cooperation. This proceeding contains the papers presented in the meeting. (author)

  4. 77 FR 2062 - Sunshine Act Meeting

    Science.gov (United States)

    2012-01-13

    ... Directors' Meetings. Memorandum and resolution re: Final Rule on Resolution Plans Required for Insured Depository Institutions with $50 Billion or More in Total Assets. Personnel Resolution for Retiring Executive. Discussion Agenda Memorandum and resolution re: Stress Testing Requirements for Certain Banks: Notice of...

  5. Tank waste remediation system engineering plan

    International Nuclear Information System (INIS)

    Rifaey, S.H.

    1998-01-01

    This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ''as is'' condition of engineering practice, systems, and facilities to the desired ''to be'' configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively

  6. 75 FR 21678 - Business and Operations Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2010-04-26

    ... Management/Leadership Development. May 19, 2010 NSF Strategic Plan Update--2010-2015; Future NSF-2013 Lease... NATIONAL SCIENCE FOUNDATION Business and Operations Advisory Committee; Notice of Meeting In... announces the following meeting: Name: Business and Operations Advisory Committee (9556). Date/Time: May 18...

  7. 78 FR 20358 - NASA Advisory Council; Science Committee; Heliophysics Subcommittee; Meeting

    Science.gov (United States)

    2013-04-04

    ... 10 working days prior to the meeting: full name; gender; date/place of birth; citizenship; visa... --Heliophysics Strategic Objectives and Performance Goals Science Mission Directorate Science Plan --Heliophysics... working days prior to the meeting to Marian Norris. Patricia D. Rausch, Advisory Committee Management...

  8. 78 FR 60309 - Notice of Public Meeting, BLM-Alaska Resource Advisory Council

    Science.gov (United States)

    2013-10-01

    [email protected] . Persons who use a telecommunications device for the deaf (TDD) may call the Federal... variety of planning and management issues associated with public land management in Alaska. At this meeting, topics planned for discussion include: Land Use Planning. Integrated Arctic Management and...

  9. 77 FR 40325 - Agenda and Notice of Public Meeting of the North Dakota Advisory Committee

    Science.gov (United States)

    2012-07-09

    .... Commission on Civil Rights, and the Federal Advisory Committee Act (FACA), that a planning meeting of the..., at the River Room, Fargo City Hall, 200 N. 3rd Street, Fargo, ND 58102. The purpose of the planning... street address. Deaf or hearing-impaired persons who will attend the meeting and require the services of...

  10. STANDING CONCERTATION COMMITTEE ORDINARY MEETING HELD ON 26 MAY AND 2 JUNE 1999

    CERN Multimedia

    1999-01-01

    Original: FrenchThe meeting was devoted essentially to examining the various items listed below:TREF meeting on 28 May 1999The items on this meeting's agenda were: a status report on the voluntary programmes, the Forum's work planning and in particular preparation for the five-yearly review of financial conditions, and the scope of application of Article R IV 1.25 of the Staff Regulations concerning the reimbursement of taxes to certain categories of students and associates.At the SCC's meeting on 26 May, the Committee members finalised the documents to be submitted to TREF, in particular the Forum's work planning and preparation for the five-yearly review.At its meeting on 2 June, the SCC took note of the results of TREF's meeting and the preparations for the next Finance Committee meeting and Council session in June:Status report on the voluntary programmesThe Forum had regarded the results of these programmes as very positive, especially those of the RSL Programme, which had made it possible to open 36 pos...

  11. 76 FR 34123 - 25th Meeting: RTCA Special Committee 206: Aeronautical Information and Meteorological Data Link

    Science.gov (United States)

    2011-06-10

    ... WG3 Meetings 28 June--Tuesday 9 a.m. Joint Plenary meeting with AEEC Systems Architecture & Interface... Meeting Plans and Dates Other Business 1 July--Friday 9 a.m. WG1, WG2, and WG3 Meetings 12 p.m. Adjourn...

  12. Designing and Implementing Performance-Based Career Ladder Plans.

    Science.gov (United States)

    Hawley, Willis D.

    1985-01-01

    Reviews the factors that any teacher motivation plan must incorporate to be effective and outlines 11 principles that should be followed in designing career ladder plans to meet teacher needs, increase teacher competence, and facilitate effective instruction. Warns against potential pitfalls in career ladder plans. (PGD)

  13. 110th ACCU Meeting

    CERN Multimedia

    2015-01-01

    Agenda for the meeting to be held on Tuesday, 8 December 2015​ at 9:15 a.m. in room Georges Charpak (Room F, 60-6-015).   Chairperson's remarks Adoption of the agenda      Minutes of the previous meeting News from the CERN Management Report on services from GS Department Report on services from IT department Strategic Communications Plan 2016-2020 Reports from ACCU representatives on other Committees Academic Training Committee Users’ Office News Matters arising Any Other Business Agenda for the next meeting   Anyone wishing to raise any points under “Any Other Business” is invited to send them to the Chairperson (Dragoslav.Lazic@cern.ch) or to the Secretary (ACCU.Secretary@cern.ch). Michael Hauschild (Secretary) ACCU is a forum for discussion between the CERN Management and representatives of the CERN users in order to review the practical means taken by CERN to support the...

  14. Proceedings of fuel safety research specialists' meeting

    International Nuclear Information System (INIS)

    Suzuki, Motoe

    2002-08-01

    Fuel Safety Research Specialists' Meeting, which was organized by Japan Atomic Energy Research Institute, was held on March 4-5, 2002 at JAERI in Tokai Establishment. Purposes of the Meeting are to exchange information and views on LWR fuel safety topics among the specialist participants from domestic and foreign organizations, and to discuss the recent and future fuel research activities in JAERI. In the Meeting, presentations were given and discussions were made on general report of fuel safety research activities, fuel behaviors in normal operation and accident conditions, FP release behaviors in severe accident conditions, and JAERI's ''Advanced LWR Fuel Performance and Safety Research Program''. A poster exhibition was also carried out. The Meeting significantly contributed to planning future program and cooperation in fuel research. This proceeding integrates all the pictures and papers presented in the Meeting. The 10 of the presented papers are indexed individually. (J.P.N.)

  15. Report on the CSC project group meeting on alternative energy resources

    International Nuclear Information System (INIS)

    1977-11-01

    Under its coordinated R and D programme the Commonwealth Science Council in cooperation with the Ministry of Agriculture, Food and Consumer Affairs, Barbados, organized a meeting to identify suitable projects for inter-country collaboration. Specifically the meeting had three aims: 1. Review present state of activities in alternative energy resources and assess small scale energy needs in the region. 2. Identify specific projects for inter-country collaboration. 3. Draft joint project proposals for such collaboration. A small group of experts (Annex VII) from Britain, Canada, USA and CSC secretariat staff made detailed plans for the Barbados meeting. With a view to assessing real energy needs locally, the Group recommended that a study be undertaken in Barbados prior to the meeting. A report on such a study was presented at the meeting. Member countries were also invited to prepare country papers. In addition, following the planning Group's recommendation, several technical papers were prepared. These covered subjects ranging from conceptual aspects to clarify objectives, assumptions and criteria to a review of all alternative energy technologies

  16. Draft of the PHENIX Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants

  17. Investigating multimodal communication in virtual meetings

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars

    2014-01-01

    recordings of their oral exchanges and video recordings of their shared dynamic representation of the project’s status and plans, our analysis reveals how their interrelating of visual and verbal communication acts enabled effective communication and coordination. In conclusion, we offer theoretical......To manage distributed work, organizations increasingly rely on virtual meetings based on multimodal, synchronous communication technologies. However, despite technological advances, it is still challenging to coordinate knowledge through these meetings with spatial and cultural separation. Against...... propositions that explain how interrelating of verbal and visual acts based on shared dynamic representations enable communication repairs during virtual meetings. We argue the proposed framework provides researchers with a novel and practical approach to investigate the complex data involved in virtual...

  18. 10 CFR 905.1 - What are the purposes of the Energy Planning and Management Program?

    Science.gov (United States)

    2010-01-01

    ... Resource Planning, allows customers of the Western Area Power Administration (Western) to meet the objectives of section 114 of EPAct through integrated resource planning or by other means, such as attaining... purposes of the Energy Planning and Management Program (EPAMP) are to meet the objectives of Section 114 of...

  19. Improving Prevention, Early Recognition and Management of Acute Kidney Injury after Major Surgery: Results of a Planning Meeting with Multidisciplinary Stakeholders

    Directory of Open Access Journals (Sweden)

    Matthew T James

    2014-08-01

    Full Text Available Purpose of review: Acute kidney injury (AKI is common after major surgery, and is associated with morbidity, mortality, increased length of hospital stay, and high health care costs. Although recent guidelines for AKI provide recommendations for identification of patients at risk, monitoring, diagnosis, and management of AKI, there is lack of understanding to guide successful implementation of these recommendations into clinical practice. Sources of information: We held a planning meeting with multidisciplinary stakeholders to identify barriers, facilitators, and strategies to implement recommendations for prevention, early identification, and management of AKI after major surgery. Barriers and facilitators to knowledge use for peri-operative AKI prevention and care were discussed. Findings: Stakeholders identified barriers in knowledge (how to identify high-risk patients, what criteria to use for diagnosis of AKI, attitudes (self-efficacy in preventive care and management of AKI, and behaviors (common use of diuretics, non-steroidal anti-inflammatory drugs, withholding of intravenous fluids, and competing time demands in peri-operative care. Educational, informatics, and organizational interventions were identified by stakeholders as potentially useful elements for future interventions for peri-operative AKI. Limitation: Meeting participants were from a single centre. Implications: The information and recommendations obtained from this stakeholder's meeting will be useful to design interventions to improve prevention and early care for AKI after major surgery.

  20. Planning ahead: Improving escalation plans before the weekend.

    Science.gov (United States)

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams.

  1. 1994 Electricity plan: An introduction to BC Hydro's integrated resource plan

    International Nuclear Information System (INIS)

    1994-01-01

    A summary is provided of British Columbia Hydro's 1994 electricity plan. The plan provides up-to-date information on the options available to meet the 20-year forecast of domestic electricity requirements as well as an evaluation of alternative resource acquisitions to assess how to best minimize social cost, fulfill corporate objectives, and meet economic development initiatives of the corporation and the provincial government. The resource evaluations also incorporate the most recent information available on energy capabilities, construction, operation, and fuel supply costs, and environmental and socio-economic impacts. The 1994 plan includes updated estimates of the costs and expected contributions from currently committed resource acquisitions, including the Power Smart and Resource Smart programs and the Burrard Upgrade Project. The continuing uncertainty concerning the return of the Canadian Entitlement to the Columbia River Treaty downstream benefits, the purchase of power from the Kemano Completion Project, and the impact of customer self-generation are also considered in the plan. Considering the forecast net energy load and the existing and committed supply, a deficit in supply is forecast by 2003/04 if the treaty entitlement is not returned and by 2008/09 if it is returned. A dependable capacity balance is forecast to be in a negative position only by 2013/14 with a full sale of the treaty entitlement. A glossary is included. 9 figs., 8 tabs

  2. Circumpolar biodiversity monitoring program (CBMP): Coastal expert workshop meeting report

    Science.gov (United States)

    Anderson, Rebecca D.; McLennan, Donald; Thomson, Laura; Wegeberg, Susse; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, Stacey; Christensen, Thomas K.; Price, Courtney

    2016-01-01

    The Coastal Expert Workshop, which took place in Ottawa, Canada from March 1 to 3, 2016, initiated the development of the Arctic Coastal Biodiversity Monitoring Plan (Coastal Plan). Meeting participants, including northern residents, representatives from industry, non-governmental organisations (NGOs), academia, and government regulators and agencies from across the circumpolar Arctic, discussed current biodiversity monitoring efforts, key issues facing biodiversity in Arctic coastal areas, and collectively identified monitoring indicators, or Focal Ecosystem Components (FECs). On February 29, the day before the workshop, a full day was allocated to Traditional Knowledge (TK) holders to meet and elucidate how this important knowledge can be included in the process of building the Coastal Plan and monitoring biodiversity in Arctic coastal areas, along with scientific data and variables. This document provides 1) background information about the Circumpolar Biodiversity Monitoring Programme and the Coastal Expert Monitoring Group, 2) overviews on workshop presentations and breakout sessions, and 3) details regarding outcomes of the workshop that will inform the drafting of the Coastal Plan.

  3. Analysis of velocity planning interpolation algorithm based on NURBS curve

    Science.gov (United States)

    Zhang, Wanjun; Gao, Shanping; Cheng, Xiyan; Zhang, Feng

    2017-04-01

    To reduce interpolation time and Max interpolation error in NURBS (Non-Uniform Rational B-Spline) inter-polation caused by planning Velocity. This paper proposed a velocity planning interpolation algorithm based on NURBS curve. Firstly, the second-order Taylor expansion is applied on the numerator in NURBS curve representation with parameter curve. Then, velocity planning interpolation algorithm can meet with NURBS curve interpolation. Finally, simulation results show that the proposed NURBS curve interpolator meet the high-speed and high-accuracy interpolation requirements of CNC systems. The interpolation of NURBS curve should be finished.

  4. 76 FR 32358 - Open Meeting Notice; Advisory Council on Dependents' Education

    Science.gov (United States)

    2011-06-06

    ... on Dependents' Education will take place. DATES: Friday, September 23, 2011, Japan Standard Time at... the stated agendas of the planned meeting of the Advisory Council on Dependents' Education. All... provided to or considered by the Advisory Council on Dependents' Education until its next meeting. The DFO...

  5. 75 FR 32418 - Meeting of the Chief of Naval Operations Executive Panel

    Science.gov (United States)

    2010-06-08

    ... discussions of current and future Navy strategy; plans, and policies in support of U.S. deterrence planning; crisis management; and conflict escalation and control. DATES: The meeting will be held on June 28, 2010...

  6. Low-level waste forum meeting reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-12-31

    This paper provides highlights from the October 1990 meeting of the Low Level Radioactive Waste Forum. Topics of discussion included: a special session on liability and financial assurance needs; proposal to dispose of mixed waste at federal facilities; state plans for interim storage; and hazardous materials legislation.

  7. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  8. EVENT PLANNING USING FUNCTION ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase; Jodi Grgich

    2011-06-01

    Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the “INL Guide for Hosting an Event.” Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning – with the primary focus on the participant – gives us the edge.

  9. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  10. Louisiana CVO/ITS business plan

    Science.gov (United States)

    1998-06-01

    Louisianas CVO / ITS Business Plan provides a long-term strategic vision and implementation program for meeting Louisianas Commercial Vehicle Operations / Intelligent Transportation Systems (CVO / ITS) needs. Commercial Vehicle Operations - CVO...

  11. Facilitated IEP Meetings. PACER Center ACTion Information Sheets: PHP-c90

    Science.gov (United States)

    PACER Center, 2014

    2014-01-01

    To help special education planning teams reach agreements, the Minnesota Department of Education, Compliance and Assistance, Alternative Dispute Resolution Services provide the option of facilitated IEP (Individualized Education Program) meetings. This option is available for IEP, IIIP (Individual Interagency Intervention Plan), and IFSP…

  12. 75 FR 31419 - Agenda and Notice of Public Meeting of the Arizona Advisory Committee

    Science.gov (United States)

    2010-06-03

    ... Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that a planning meeting of the... COMMISSION ON CIVIL RIGHTS Agenda and Notice of Public Meeting of the Arizona Advisory Committee... and after the meeting. Persons interested in the work of this advisory committee are advised to go to...

  13. Endangered Species and North American Waterfowl Management Plan Joint Venture Areas

    National Research Council Canada - National Science Library

    Allred, Karla

    1996-01-01

    ...) Endangered Species Recovery Plans that meet the recovery plan requirements; and the percent of Corps acreage included within North American Waterfowl Management Joint Venture Implementation Plans where proposed work has been accomplished...

  14. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan. Revision 1

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-03-01

    This plan contains the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program. The plan outlines the activities and schedules developed by the ERC to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. This plan satisfies US Department of Energy (DOE) requirements including the Pollution Prevention Awareness program required by DOE Order 5400.1 (DOE 1988). This plan is consistent with Executive Order 12856 and Secretary O'Leary's pollution prevention Policy Statement of December 27, 1994, which set US and DOE pollution prevention policies, respectively. It is also consistent with the DOE Pollution Prevention Crosscut Plan, 1994, which provides guidance in meeting the DOE goals in pollution prevention. The purpose of this plan is to aid ERC projects in meeting and documenting compliance with requirements for WMin/P2. This plan contains the objectives, strategy, and support activities of the ERC Team WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Wherever appropriate, the ERC will integrate the pollution prevention activities in this plan into regular program activities rather than establishing separate WMin/P2 activities. Moreover, wherever possible, existing documents, procedures, and activities will be used to meet WMin/P2 requirements

  15. 75 FR 47030 - National Science Board; Sunshine Act Meetings; Notice

    Science.gov (United States)

    2010-08-04

    ... Committee on Programs and Plans. STATUS: Open. LOCATION: This meeting will be held by teleconference... Programs and Plans, pursuant to NSF regulations (45 CFR part 614), the National Science Foundation Act, as... business and other matters specified, as follows: DATE AND TIME: August 12, 2010 at 3 p.m. EDT. SUBJECT...

  16. 76 FR 12942 - Gulf Spill Restoration Planning; Meeting Location Correction for Public Scoping Meetings for the...

    Science.gov (United States)

    2011-03-09

    ...: Bayou Vista Community Center, 1333 Belleview Street, Morgan City, LA. Dated: March 4, 2011. Patricia A... meeting in Pensacola, FL, Spanish Fort, AL, Houma, LA, and Morgan City, LA. No other information in the... Houma, LA and Morgan City, LA will start at 6:30 p.m. (local time) and open doors at 5:30 p.m. FOR...

  17. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  18. Integrating fire management analysis into land management planning

    Science.gov (United States)

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  19. EDITORIAL: Nano Meets Spectroscopy Nano Meets Spectroscopy

    Science.gov (United States)

    Birch, David J. S.

    2012-08-01

    The multidisciplinary two-day Nano Meets Spectroscopy (NMS) event was held at the National Physical Laboratory (NPL), Teddington, UK, in September 2011. The event was planned from the outset to be at the interface of several areas—in particular, spectroscopy and nanoscience, and to bring together topics and people with different approaches to achieving common goals in biomolecular science. Hence the meeting cut across traditional boundaries and brought together researchers using diverse techniques, particularly fluorescence and Raman spectroscopy. Despite engaging common problems, these techniques are frequently seen as mutually exclusive with the two communities rarely interacting at conferences. The meeting was widely seen to have lived up to its billing in good measure. It attracted the maximum capacity of ~120 participants, including 22 distinguished speakers (9 from outside the UK), over 50 posters and a vibrant corporate exhibition comprising 10 leading instrument companies and IOP Publishing. The organizers were Professor David Birch (Chair), Dr Karen Faulds and Professor Duncan Graham of the University of Strathclyde, Professor Cait MacPhee of the University of Edinburgh and Dr Alex Knight of NPL. The event was sponsored by the European Science Foundation, the Institute of Physics, the Royal Society of Chemistry, NPL and the Scottish Universities Physics Alliance. The full programme and abstracts are available at http://sensor.phys.strath.ac.uk/nms/program.php. The programme was quite ambitious in terms of the breadth and depth of scope. The interdisciplinary and synergistic concept of 'X meets Y' played well, cross-fertilization between different fields often being a source of inspiration and progress. Fluorescence and Raman spectroscopy provided the core, but the meeting had little repetition and also attracted contributions on more specialist techniques such as CARS, super-resolution, single molecule and chiral methods. In terms of application the

  20. Fleet Planning Decision-Making: Two-Stage Optimization with Slot Purchase

    Directory of Open Access Journals (Sweden)

    Lay Eng Teoh

    2016-01-01

    Full Text Available Essentially, strategic fleet planning is vital for airlines to yield a higher profit margin while providing a desired service frequency to meet stochastic demand. In contrast to most studies that did not consider slot purchase which would affect the service frequency determination of airlines, this paper proposes a novel approach to solve the fleet planning problem subject to various operational constraints. A two-stage fleet planning model is formulated in which the first stage selects the individual operating route that requires slot purchase for network expansions while the second stage, in the form of probabilistic dynamic programming model, determines the quantity and type of aircraft (with the corresponding service frequency to meet the demand profitably. By analyzing an illustrative case study (with 38 international routes, the results show that the incorporation of slot purchase in fleet planning is beneficial to airlines in achieving economic and social sustainability. The developed model is practically viable for airlines not only to provide a better service quality (via a higher service frequency to meet more demand but also to obtain a higher revenue and profit margin, by making an optimal slot purchase and fleet planning decision throughout the long-term planning horizon.

  1. 76 FR 58020 - Prescription Drug User Fee Act IV Information Technology Plan

    Science.gov (United States)

    2011-09-19

    ...] Prescription Drug User Fee Act IV Information Technology Plan AGENCY: Food and Drug Administration, HHS. ACTION... information technology (IT) plan entitled ``PDUFA IV Information Technology Plan'' (updated plan) to achieve... Information Technology Plan.'' This plan will meet one of the performance goals agreed to under the 2007...

  2. Stereo vision based automated grasp planning

    International Nuclear Information System (INIS)

    Wilhelmsen, K.; Huber, L.; Silva, D.; Grasz, E.; Cadapan, L.

    1995-02-01

    The Department of Energy has a need for treating existing nuclear waste. Hazardous waste stored in old warehouses needs to be sorted and treated to meet environmental regulations. Lawrence Livermore National Laboratory is currently experimenting with automated manipulations of unknown objects for sorting, treating, and detailed inspection. To accomplish these tasks, three existing technologies were expanded to meet the increasing requirements. First, a binocular vision range sensor was combined with a surface modeling system to make virtual images of unknown objects. Then, using the surface model information, stable grasp of the unknown shaped objects were planned algorithmically utilizing a limited set of robotic grippers. This paper is an expansion of previous work and will discuss the grasp planning algorithm

  3. Strategic and Operational Plan for Integrating Transcriptomics ...

    Science.gov (United States)

    Plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT; the details are in the attached slide presentation presentation on plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT, given at the OECD meeting on June 23, 2016

  4. 75 FR 72790 - Gulf of Mexico Fishery Management Council; Public Meetings

    Science.gov (United States)

    2010-11-26

    ... restoration plan, the Long Term Recovery Plan After the Deepwater Horizon Oil Spill, and the Essential Fish... Louisiana/Mississippi Habitat Protection Advisory Panel (AP). DATES: The meeting will convene at 9 a.m. on... FURTHER INFORMATION CONTACT: Jeff Rester, Habitat Support Specialist, Gulf States Marine Fisheries...

  5. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  6. Inaugural Meeting of North American Pancreatic Cancer Organizations: Advancing Collaboration and Communication.

    Science.gov (United States)

    Kenner, Barbara J; Fleshman, Julie M; Goldberg, Ann E; Rothschild, Laura J

    2015-11-01

    A meeting of North American Pancreatic Cancer Organizations planned by Kenner Family Research Fund and Pancreatic Cancer Action Network was held on July 15-16, 2015, in New York City. The meeting was attended by 32 individuals from 20 nonprofit groups from the United States and Canada. The objectives of this inaugural convening were to share mission goals and initiatives, engage as leaders, cultivate potential partnerships, and increase participation in World Pancreatic Cancer Day. The program was designed to provide opportunities for informal conversations, as well as facilitated discussions to meet the stated objectives. At the conclusion of the meeting, the group agreed that enhancing collaboration and communication will result in a more unified approach within the field and will benefit individuals diagnosed with pancreatic cancer. As a first step, the group will actively collaborate to participate in World Pancreatic Cancer Day, which is planned for November 13, 2015, and seeks to raise the level of visibility about the disease globally.

  7. Kyoto and beyond : A plan of action to meet and exceed Manitoba's Kyoto targets

    International Nuclear Information System (INIS)

    2002-10-01

    This document represents the next step in Manitoba's effort to mitigate the effects of climate change. A message from the Manitoba Premier and the Minister of Conservation of Manitoba are included in the introduction. The Action Plan is based in part on the discussion among climate experts and public input gathered in the course of the 2001 task force and the 2001 public forum on climate change. A rise in average global temperatures is affecting most of the planet, which is due in part to the upsetting of the balance of greenhouse gases in the atmosphere as a result of human activities. It is affecting weather patterns, water, agriculture, forests, health and welfare, and life in the North. The Manitoba government is committed to meeting and exceeding the reduction targets set under the Kyoto Protocol through renewable electricity, Selkirk conversion, ethanol, methane capture, and other measures targeted toward industry. Energy efficiency also plays a big part in the process of reducing greenhouse gas emissions. The government is leading by example, and also investing in knowledge. It is promoting technology development and innovation while enhancing awareness and understanding. All sectors are being encouraged to implement appropriate measures. The various initiatives undertaken by each department and organization under each of those headings are described. figs

  8. 78 FR 54910 - Notice of Public Meeting for the Southeast Oregon Resource Advisory Council

    Science.gov (United States)

    2013-09-06

    ...-4519, or email [email protected] . Persons who use a telecommunications device for the deaf (TDD) may... management planning; forage management and grassbanks; and planning future meeting agendas, dates, and...

  9. AGU Panel meets on career topics

    Science.gov (United States)

    Hollister, Charles

    Graduate students and their career opportunities in ocean and earth sciences were the focus of the Education and Human Resources (E & HR) Committee meeting held at the 1982 AGU Fall Meeting in San Francisco. A standing committee of AGU, the E & HR committee is responsible for matters concerning education in earth, ocean, and planetary sciences from precollege through graduate programs, including career guidance, academic preparation, student recruitment, and manpower supply and demand.At the meeting a draft of the AGU-sponsored Careers in Oceanography booklet by committee chairman C. Hollister was thoroughly discussed and a new draft will emerge soon for final approval. The booklet is designed to complement the Careers in Geophysics booklet recently published by AGU; the booklets contain information about planning a career, job opportunities, educational requirements, and a synopsis of where the prospective student might apply.

  10. Proceedings of the Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting (15th) Held at Washington, DC on 6-8 December 1983,

    Science.gov (United States)

    1984-04-02

    of remote synchronization via network television broadcasts, Loran-C and portable clocks", Metrologia , 8, No. 2, pp 64- 72, (April 1972) 5. Lukac, Carl...Electromagnetic Measurements, 1982. 4. Allan, D., Hellwig, H., and Glaze, D., An Accuracy Algorithm for An Atomic Time Scale, Metrologia 11, 133 1975. 5. Jones...0 -o n rn -4 -- rn V)--- Cl(fL r1 pn 04 -- 4 (% I4 q-4 .-4 0 4 C% 4~ 1 A rnj -4 % ~~4t~L -4 1~ 1 0 U) I I Vf) W 0 0 4-NLn -nN N -4 L n LA L Nt0 (J01

  11. Proceedings of the Annual Precise Time and Time Interval (PTTI) Planning Meeting (6th). Held at U.S. Naval Research Laboratory, December 3-5, 1974

    Science.gov (United States)

    1974-01-01

    LABORATORY WASHINGTON, D. C. TUproeluee<rbv , NATIONAL TECHNICAL INFORMATION SERVICE U S D«portmenl of Commerce SprlngfieM VA2J131 las ■ - - ™%i...Instr. and Meas. IM-21, p. 396, 1972. 5. Note sur la liaison transatlautique par LORAN-C, M. Granveaud and B. Mazodier, Annales francaises de...Bell, "Some experimental results with an atomic hydrogen storage beam frequency stand- ard," Metrologia , vol. 8, pp. 96-98, Apr. 1972. [21] H. Lyons

  12. Proceedings of the Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting (22nd) Held in Vienna, Virginia on 4-6 Dec 1990

    Science.gov (United States)

    1991-05-01

    recc:,t;,- were able to easily obtain 30 in. Tlis has lead the DoD to review its policy concerning availabilit . of OPS to the general 146 public. The...ve on sample 11 from a strip of double sided tape was removet’ b., rubbing with Alconox cleaner dissolved in water . Carv was taken not to distort the... availabilit due to autonomous redundancy management. Minor changes (in the technical sense) to the hardware and software would permit autonomous recovery from

  13. Experience with the Agency's WASP for nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1986-02-01

    An Advisory Group Meeting to discuss recent experience with, and to suggest improvements to, Wien Automatic System Planning Program (WASP), was held in Vienna in September 1985. It was clear from the meeting that WASP is a very useful tool as an aid in planning electric power generation systems. It is widely used in both developed and developing countries and its use will continue particularly if some of the suggestions for its improvements are implemented. A separate abstract was prepared for each of the 15 presentations of this meeting

  14. Planning for Accessibility.

    Science.gov (United States)

    Spoor, Dana L.

    1997-01-01

    Argues that barrier-free designs should be incorporated in the first steps of school facility planning to avoid the difficulties in meeting Americans with Disabilities Act (ADA) guidelines during renovations. Explains why not all barriers need be removed to make a facility accessible to everyone. Discusses issues involving ADA guidelines and child…

  15. Flexible benefits plans. Perceptions of their effectiveness.

    Science.gov (United States)

    Agho, A O

    1995-01-01

    Flexible benefits plans have been used in businesses since the 1970s to control healthcare costs and meet the needs of an increasingly diverse work force. More recently, healthcare organizations have begun to implement the flexible benefits concept. This study collected data from human resources executives at hospitals with and without flex plans to investigate how they perceive the effectiveness of and the problems associated with such plans.

  16. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    2001-01-01

    Full text: A preparatory meeting of the Co-ordinated Technical Activities (CTA) Project Board took place in Vienna on 16 July 2001. The Board Members of Canada, EU, Japan, RF and of the CTA International Team participated in the Meeting, which was chaired by Acad. E. Velikhov. The major item on the Meeting Agenda was the discussion of the scope of the CTA. In this discussion the following comments were expressed: One of the prime objectives during the CTA is to develop technical specifications for procurement of critical items (magnets, vacuum vessel, and buildings). It was noted that the discussions with potential suppliers should confirm manufacturing processes in details in order to explore possible schedule reduction strategies. Safety analysis and licensing preparation should proceed on all proposed sites up to the preferred site designation, to ensure the overall implementation schedule is minimized and to resolve major technical issues needed for licensing. Several R and D issues remain to be further developed during the CTA. Special attention should be given by the Participants to two areas: Diagnostics; Heating and Current Drive Systems. Arrangements for continuation of the ITER Physics Expert Groups activities should be provided. To this end a new framework, called International Tokamak Physics Activity, is being planned. The Board encouraged the Participants' Representatives in the Co-ordinating committee of this activity to support the preparation for urgent Topical Group Meetings. The Board agreed that the Design Authority will be invested in the International Team and that proposals for site specific design changes should be agreed upon by the International Team Leader before being studied in detail. The Meeting agreed on some arrangements which will remain from the EDA, namely the ITER EDA Council Office in Moscow as Office of the PB Chair, and the ITER Office located at the IAEA in Vienna as agreed by the IAEA. The Board recommended that effective

  17. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  18. IAEA supports regional seas conventions and action plans

    International Nuclear Information System (INIS)

    2000-01-01

    The document informs about the 3rd Global Meeting of Regional Seas Conventions and Action Plans held in Monaco in November 2000 at the IAEA's Marine Environmental Laboratory (IAEA-MEL). The meeting assembled a number of marine environmental experts from several UN bodies to reinforce activities to protect the marine environment

  19. IAEA Convenes Board Meeting on Iran

    International Nuclear Information System (INIS)

    2014-01-01

    Full text: ''I welcome the recent announcement by the EU High Representative Catherine Ashton regarding the implementation of the Joint Plan of Action on the Iranian nuclear programme, which is to take effect as of 20 January. ''I have received a request from Iran and the E3/EU+3 that the Agency conducts monitoring and verification of nuclear-related measures in relation to the Joint Plan of Action. ''I have requested that a meeting of the Board of Governors be convened on 24 January, to consult with the Board regarding the request by Iran and the E3/EU+3 for the Agency to undertake monitoring and verification of nuclear-related measures in relation to the Joint Plan of Action.'' (IAEA)

  20. 78 FR 48915 - Sunshine Act Meetings Notice

    Science.gov (United States)

    2013-08-12

    ... the May 9, 2013 meeting Committee Chairman's opening remarks Inspector General's update Chief Financial Officer's update Periodic review of A&O committee charge Committee Chairman's closing remarks... Roles of the Annual Facility Plan and APR o 2013 APR General Discussion: Next steps o 2014 focus topic o...

  1. [Designing the Annual Meeting and Active Learning System].

    Science.gov (United States)

    Kawamura, Kazumi

    2018-01-01

     At the 10th Annual Meeting of the Japanese Society for Pharmaceutical Palliative Care and Sciences our theme centered on active learning systems where adult learners engage on their own initiative. Many of the participants were pharmacists active in clinical practices. Regardless of their specialized skill-sets, pharmacists are constantly faced with difficult challenges in their daily work. Passive, one-way lectures are one resource for them, but unfortunately such lectures provide limited insights for resolving concrete problems. The present meeting aimed to show participants how to obtain information they need to solve specific real-world problems. This paper summarizes how we planned this year's meeting, including details about the debate symposium, social lunch, and online questionnaires. All these elements had the end goal of enabling learners proactivity to become their own best resource for learning. It is sincerely hoped that the design and execution of this meeting will prove resourceful for future annual meetings.

  2. Patient-focused goal planning process and outcome after spinal cord injury rehabilitation: quantitative and qualitative audit.

    Science.gov (United States)

    Byrnes, Michelle; Beilby, Janet; Ray, Patricia; McLennan, Renee; Ker, John; Schug, Stephan

    2012-12-01

    To evaluate the process and outcome of a multidisciplinary inpatient goal planning rehabilitation programme on physical, social and psychological functioning for patients with spinal cord injury. Clinical audit: quantitative and qualitative analyses. Specialist spinal injury unit, Perth, Australia. Consecutive series of 100 newly injured spinal cord injury inpatients. MAIN MEASURE(S): The Needs Assessment Checklist (NAC), patient-focused goal planning questionnaire and goal planning progress form. The clinical audit of 100 spinal cord injured patients revealed that 547 goal planning meetings were held with 8531 goals stipulated in total. Seventy-five per cent of the goals set at the first goal planning meeting were achieved by the second meeting and the rate of goal achievements at subsequent goal planning meetings dropped to 56%. Based on quantitative analysis of physical, social and psychological functioning, the 100 spinal cord injury patients improved significantly from baseline to discharge. Furthermore, qualitative analysis revealed benefits consistently reported by spinal cord injury patients of the goal planning rehabilitation programme in improvements to their physical, social and psychological adjustment to injury. The findings of this clinical audit underpin the need for patient-focused goal planning rehabilitation programmes which are tailored to the individual's needs and involve a comprehensive multidisciplinary team.

  3. 78 FR 41914 - Caribbean Fishery Management Council; Public Meeting

    Science.gov (United States)

    2013-07-12

    ... Island-Specific Fishery Management Plans for Puerto Rico and the U.S. Virgin Islands: Action 1: Establish... group for discussion, those issues may not be subjects for formal action during this meeting. Actions...

  4. China Mobile Phone Industry CEO Annual Meeting Opening in November

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ 2006 China Mobile Phone Industry CEO Annual Meeting (www.cmqc.org.cn) will open at Beijing State Guest Hotel On November 1. By that time, over 300 CEO will gather there to contend about the theme of this annual meeting "The World Competitiveness of China Mobile Industry Right Territory", view the unforgettable evening of "2006 Wisdom Sharing Brainstorming, 2007 Perspective Plan Hand in Hand".

  5. Quality of Family Planning Services in Primary Health Centers of ...

    African Journals Online (AJOL)

    Background: Good quality of care in family planning (FP) services help individuals and couples to meet their reproductive health needs safely and effectively. Therefore, assessment and improvement of the quality of family planning services could enhance family planning services utilization. This study was thus conducted ...

  6. Progress of health plans toward meeting the million hearts clinical target for high blood pressure control - United States, 2010-2012.

    Science.gov (United States)

    Patel, Milesh M; Datu, Bennett; Roman, Dan; Barton, Mary B; Ritchey, Matthew D; Wall, Hilary K; Loustalot, Fleetwood

    2014-02-14

    High blood pressure is a major cardiovascular disease risk factor and contributed to >362,895 deaths in the United States during 2010. Approximately 67 million persons in the United States have high blood pressure, and only half of those have their condition under control. An estimated 46,000 deaths could be avoided annually if 70% of patients with high blood pressure were treated according to published guidelines. To assess blood pressure control among persons with health insurance, CDC and the National Committee for Quality Assurance (NCQA) examined data in the 2010-2012 Healthcare Effectiveness Data and Information Set (HEDIS). In 2012, approximately 113 million adults aged 18-85 years were covered by health plans measured by HEDIS. The HEDIS controlling blood pressure (CBP) performance measure is the proportion of enrollees with a diagnosis of high blood pressure confirmed in their medical record whose blood pressure is controlled. Overall, only 64% of enrollees with diagnosed high blood pressure in HEDIS-reporting plans had documentation that their blood pressure was controlled. Although these findings signal that additional work is needed to meet the 70% target, modest improvements since 2010, coupled with focused efforts, might make it achievable.

  7. Public comments and responses to the 1989 Hanford cleanup five-year plan

    International Nuclear Information System (INIS)

    1991-06-01

    In April 1990 the US Department of Energy (DOE) issued a site- specific Five-Year Plan (DOE-RL 1989a) on Hanford's cleanup for public review and comment. The plan guides Hanford in carrying out DOE's national plan for environmental restoration and waste management. During the 90-day public comment period, DOE held nine public meetings to answer questions and gather comments on the plan. This report is in three main sections. The first presents consolidated public comments and responses. These were compiled from both verbal comments from public meetings and written comments. The second section contains comments not responded to in this plan. Those comments were outside this plan's scope, related to how we gathered public comments, or intended for and directed to DOE-Headquarters. In the appendixes are the written comment letters we received and a short glossary and list of special terms we use. The source of comments is shown in parentheses after the comment. The individual who made the comment, the city of the public meeting, or the organization name is generally used. When several sources gave the same comment, a source was not listed. 26 refs

  8. 78 FR 15682 - Notice of Public Meeting of the Texas Advisory Committee

    Science.gov (United States)

    2013-03-12

    ..., TX 77027. The purpose of the meeting is for the Committee to receive orientation and ethic training and plan future activities. Orientation and ethics training is the first item on the agenda. After... Office at (213) 894- 3437. Hearing-impaired persons who will attend the meeting and require the services...

  9. SU-F-T-358: Is Auto-Planning Useful for Volumetric-Modulated Arc Therapy Planning in Rectal Cancer Radiotherapy?

    International Nuclear Information System (INIS)

    Li, K; Chang, X; Wang, J; Hu, P; Hu, W

    2016-01-01

    Purpose: To evaluate whether Auto-Planning based volumetric-modulated radiotherapy (auto-VMAT) can reduce manual interaction time during treatment planning and improve plan quality for rectal cancer radiotherapy. Methods: Ten rectal cancer patients (stage II and III) after radical resection using Dixon surgery were enrolled. All patients were treated with VMAT technique. The manual VMAT plans (man-VMAT) were designed in the Pinnacle treatment planning system (Version 9.10) following the standard treatment planning procedure developed in our department. Clinical plans were manually designed by our experienced dosimetrists. Additionally, an auto-VMAT plan was created for each patient using Auto-Planning module. However, manual interaction was still applied to meet the clinical requirements. The treatment planning time and plan quality surrogated by the DVH parameters were compared between manual and automated plans. Results: The total planning time and manual interaction time were 50.38 and 4.47 min for the auto-VMAT and 36.81 and 16.94 min for the man-VMAT (t=60.14,−23.86; p=0.000, 0.000). In terms of plan quality, both plans meet the clinical requirements. The PTV homogeneity index (HI) and conformity index (CI) were 0.054 and 0.822 for the auto-VMAT and 0.059 and 0.815 for the man-VMAT (t=−1.72, 0.36;p=0.119,0.730).Compared to the man-VMAT, the auto-VMAT showed reduction of 11.9% and 0.7% in V40 and V50 of the bladder, respectively.The V30 and D mean were reduced by 14.0% and 5.1Gy in the left femur and 12.2% and 3.8Gy in the right femur. Conclusion: The Auto-Planning based VMAT plans not only shows similar or superior plan quality to the manual ones in the rectal cancer radiotherapy, but also improve the planning efficiency significantly. However, manual interactions are still required to achieve a clinically acceptable plan based on our experiences.

  10. SU-F-T-358: Is Auto-Planning Useful for Volumetric-Modulated Arc Therapy Planning in Rectal Cancer Radiotherapy?

    Energy Technology Data Exchange (ETDEWEB)

    Li, K; Chang, X; Wang, J; Hu, P; Hu, W [Fudan University Shanghai Cancer Center, Shanghai, Shanghai (China)

    2016-06-15

    Purpose: To evaluate whether Auto-Planning based volumetric-modulated radiotherapy (auto-VMAT) can reduce manual interaction time during treatment planning and improve plan quality for rectal cancer radiotherapy. Methods: Ten rectal cancer patients (stage II and III) after radical resection using Dixon surgery were enrolled. All patients were treated with VMAT technique. The manual VMAT plans (man-VMAT) were designed in the Pinnacle treatment planning system (Version 9.10) following the standard treatment planning procedure developed in our department. Clinical plans were manually designed by our experienced dosimetrists. Additionally, an auto-VMAT plan was created for each patient using Auto-Planning module. However, manual interaction was still applied to meet the clinical requirements. The treatment planning time and plan quality surrogated by the DVH parameters were compared between manual and automated plans. Results: The total planning time and manual interaction time were 50.38 and 4.47 min for the auto-VMAT and 36.81 and 16.94 min for the man-VMAT (t=60.14,−23.86; p=0.000, 0.000). In terms of plan quality, both plans meet the clinical requirements. The PTV homogeneity index (HI) and conformity index (CI) were 0.054 and 0.822 for the auto-VMAT and 0.059 and 0.815 for the man-VMAT (t=−1.72, 0.36;p=0.119,0.730).Compared to the man-VMAT, the auto-VMAT showed reduction of 11.9% and 0.7% in V40 and V50 of the bladder, respectively.The V30 and D mean were reduced by 14.0% and 5.1Gy in the left femur and 12.2% and 3.8Gy in the right femur. Conclusion: The Auto-Planning based VMAT plans not only shows similar or superior plan quality to the manual ones in the rectal cancer radiotherapy, but also improve the planning efficiency significantly. However, manual interactions are still required to achieve a clinically acceptable plan based on our experiences.

  11. HANDI 2000 project execution plan

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems

  12. 76 FR 26253 - Marine Fisheries Advisory Committee Meeting

    Science.gov (United States)

    2011-05-06

    ...; National Ocean Policy, coastal and marine spatial planning, ocean energy and climate change adaptation... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA412 Marine Fisheries Advisory Committee Meeting AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and...

  13. Urban Plan and Water Infrastructures Planning: A Methodology Based on Spatial ANP

    Directory of Open Access Journals (Sweden)

    Michele Grimaldi

    2017-05-01

    Full Text Available Cities are exploding, occupying rural territory in dispersed and fragmented ways. A consequence of this phenomenon is that the demand for utilities includes more and more extensive territories. Among them, fulfilling the demand for services related to integrated water service presents many difficulties. The economic costs needed to meet service demand and the environmental costs associated with its non-fulfilment are inversely proportional to the population needing service in rural areas, since that population is distributed across a low-density gradient. Infrastructure planning, within the area of competence, generally follows a policy of economic sustainability, fixing a service coverage threshold in terms of a “sufficient” concentration of population and economic activity (91/271/CEE. This threshold, homogenous within the territorial limits of a water infrastructure plan, creates uncertainty in the planning of investments, which are not sized on the actual, appropriately spatialized, demand for service. Careful prediction of the location of infrastructure investments would guarantee not only economic savings but also reduce the environmental costs generated by the lack of utilities. Therefore, is necessary to create a link between water infrastructure planning and urban planning, which is responsible for the future spatial distribution of service demand. In this study, the relationships between the instruments of regulation and planning are compared by a multi-criteria spatial analysis network (analytic network process (ANP. This method, tested on a sample of a city in southern Italy, allows us to optimize the design and location of the investment needed to meet the service criteria, looking at the actual efficiency of the networks. The result of this application is a suitability map that allows us to validate the criteria for defining urban transformations.

  14. [Participants-centered Design of Annual Meeting: From the Perspectives of Instructional Systems].

    Science.gov (United States)

    Suzuki, Katsuaki

    2018-01-01

     This paper examines the reform experience of the 10th Annual Meeting of the Japanese Society for Pharmaceutical Palliative Care and Sciences from Instructional Systems perspectives, to check whether it was effective, efficient, and appealing for participants. "Instructional Systems" has been a research area in educational technology for the past 50 years, and has also been applied to training and human resource development in healthcare domains. If an annual meeting is to be designed for participants' learning, then perspectives of Instructional Systems can be applied to interpret the effort of the reform. First, fill in the gaps of participants' knowledge, using before-and-after comparison. Design a conference to meet the needs of its participants by checking why they attend (expectations) and what they bring in (starting status). Second, design the conference as a process of innovation. The bigger the expected changes, the more carefully participants should be prepared to accommodate them. Third, follow plan-do-check-action cycles with data for confirming and revising the new ways of running the meeting. Plan to check "exportability" of the new ways, to assess whether it can be generalized to future meetings.

  15. College of New Caledonia Three Year Plan, 1991-1994.

    Science.gov (United States)

    Seens, Paul

    In 1991, the College of New Caledonia (CNC) (British Columbia, Canada) prepared this 3-year plan representing the college's vision of the future as it attempts to meet the educational needs of the region. Identifying key opportunities open to CNC, this nine-part plan describes CNC's mission, goals, plans, and objectives. Section I provides an…

  16. 75 FR 44998 - The Future of Aviation Advisory Committee (FAAC) Aviation Safety Subcommittee; Notice of Meeting

    Science.gov (United States)

    2010-07-30

    ... evolving transportation needs, challenges, and opportunities of the global economy. The Aviation Safety... activities associated with the list of priority safety issues developed during the first meeting. The subcommittee will also develop a work plan for future meetings. DATES: The meeting will be held on August 24...

  17. Low-level waste forum meeting reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This paper provides highlights from the 1995 summer meeting of the Low Level radioactive Waste Forum. Topics included: new developments in state and compacts; federal waste management; DOE plans for Greater-Than-Class C waste management; mixed wastes; commercial mixed waste management; international export of rad wastes for disposal; scintillation cocktails; license termination; pending legislation; federal radiation protection standards.

  18. Low-level waste forum meeting reports

    International Nuclear Information System (INIS)

    1995-01-01

    This paper provides highlights from the 1995 summer meeting of the Low Level radioactive Waste Forum. Topics included: new developments in state and compacts; federal waste management; DOE plans for Greater-Than-Class C waste management; mixed wastes; commercial mixed waste management; international export of rad wastes for disposal; scintillation cocktails; license termination; pending legislation; federal radiation protection standards

  19. Ninth regular meeting of the International Working Group on Reliability of Reactor Pressure Components, Vienna, 18-20 October 1988

    International Nuclear Information System (INIS)

    1990-04-01

    The 9th regular meeting of the International Working Group on Reliability of Pressure Components took place from 18-20 October 1988 at the Agency's Headquarters. The meeting was attended by 25 representatives from 19 Member States and International Organizations. The agenda of the meeting included overviews of the national activities in the field of pressure retaining components of PWRs, review of the past IWGRRPC activities and updating of the working plan for years 1989-1992. A great deal of attention was paid to the involvement of the IWGRRPC in the Agency's programme on nuclear power plant ageing and life extension. Members of the IWGRRPC reviewed the long term plan of the activities and proposed a provisional list and scope of the IAEA Specialists' Meetings planned for the period 1989-1992. Seventeen papers were presented at the meeting. A separate abstract was prepared for each of these papers. Refs, figs and tabs

  20. Approval Plans in ARL Libraries. Kit 83.

    Science.gov (United States)

    Leonhardt, Thomas W.

    Materials in this collection were submitted by respondents to a survey which sought specific data on the numbers and types of approval plans in Association of Research Libraries (ARL) libraries, whether such plans are meeting expectations, their relative importance in the library, who makes the key decisions, and the kind of thought and study that…

  1. Integrating climate change into the transportation planning process : final report

    Science.gov (United States)

    2008-07-01

    The objective of this study is to advance the practice and application of transportation planning among state, regional, and local transportation planning agencies to successfully meet growing concerns about the relationship between transportation an...

  2. Tools for Supporting Distributed Agile Project Planning

    Science.gov (United States)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  3. SU-E-P-38: Comparison of Capri Applicator HDR Planning Methods to Meet the NCCN Uterine Neoplasm 2.2015 Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Klash, S; Steinman, J [Radphys Oncology Services, LLC, Knoxville, TN (United States); Stanley, T [CCS Oncology Center, Kenmore, NY (United States); Kim, D; Yi, S [CCS Oncology, Williamsville, NY (United States); Yap, J [CCS Oncology, Williamsville, New York (United States)

    2015-06-15

    Purpose: To establish a systematic planning approach for Capri intravaginal multichannel balloon applicators that meet updated Version 2.2015 NCCN guidelines for uterine neoplasms, which dictate delivery of 400 to 600 cGy in 2 to 3 fractions prescribed to the vaginal mucosa for HDR combined with EBRT as well as a regimen of 600 cGy x 5 (to the vaginal mucosa) for HDR brachytherapy alone. Methods: Studies have shown three different channel configurations of the Capri applicator are optimal for dosimetric conformity: central channel combined with the six inner ring channels (R12), all inner and outer ring channels (R23), or all thirteen channels (R123). To minimize the dose to the vaginal mucosa, a traditional 0.5cm expansion contour from the Capri surface was created. Optimization limits were set to push 600 cGy to 100% of the Capri volume, while simultaneously restricting dose to the expansion contour. Results: Plans were created using all three configurations (R12, R23, R123) and evaluated to determine which was best for delivering 600 cGy to the vaginal mucosa. Our criteria was: Capri V100 > 98%, Vaginal Mucosa Dmax < 125%, Bladder Dmax < 100%, Rectum Dmax < 100%. All configurations show Capri V100 values greater than 98.5%, with differences between plans varying by less than 1%. Vaginal mucosal Dmax values showed differences of roughly 5% of prescription. The R12 configuration proved the lowest vaginal mucosa Dmax, on average. The OAR Dmax values showed an average dose difference of roughly 2% of prescription, with the R23 configuration having the best results. Conclusion: The R12 channel configuration optimally fits our planning criteria and NCCN guidelines for 600 cGy prescribed to the vaginal mucosa. On average, it produced the highest Capri V100, the lowest vaginal mucosal Dmax, and a marginally higher OAR Dmax doses compared to the R23 and R123 plans.

  4. SU-E-P-38: Comparison of Capri Applicator HDR Planning Methods to Meet the NCCN Uterine Neoplasm 2.2015 Guidelines

    International Nuclear Information System (INIS)

    Klash, S; Steinman, J; Stanley, T; Kim, D; Yi, S; Yap, J

    2015-01-01

    Purpose: To establish a systematic planning approach for Capri intravaginal multichannel balloon applicators that meet updated Version 2.2015 NCCN guidelines for uterine neoplasms, which dictate delivery of 400 to 600 cGy in 2 to 3 fractions prescribed to the vaginal mucosa for HDR combined with EBRT as well as a regimen of 600 cGy x 5 (to the vaginal mucosa) for HDR brachytherapy alone. Methods: Studies have shown three different channel configurations of the Capri applicator are optimal for dosimetric conformity: central channel combined with the six inner ring channels (R12), all inner and outer ring channels (R23), or all thirteen channels (R123). To minimize the dose to the vaginal mucosa, a traditional 0.5cm expansion contour from the Capri surface was created. Optimization limits were set to push 600 cGy to 100% of the Capri volume, while simultaneously restricting dose to the expansion contour. Results: Plans were created using all three configurations (R12, R23, R123) and evaluated to determine which was best for delivering 600 cGy to the vaginal mucosa. Our criteria was: Capri V100 > 98%, Vaginal Mucosa Dmax < 125%, Bladder Dmax < 100%, Rectum Dmax < 100%. All configurations show Capri V100 values greater than 98.5%, with differences between plans varying by less than 1%. Vaginal mucosal Dmax values showed differences of roughly 5% of prescription. The R12 configuration proved the lowest vaginal mucosa Dmax, on average. The OAR Dmax values showed an average dose difference of roughly 2% of prescription, with the R23 configuration having the best results. Conclusion: The R12 channel configuration optimally fits our planning criteria and NCCN guidelines for 600 cGy prescribed to the vaginal mucosa. On average, it produced the highest Capri V100, the lowest vaginal mucosal Dmax, and a marginally higher OAR Dmax doses compared to the R23 and R123 plans

  5. Career/Life Planning for Divorced Women: An Overview.

    Science.gov (United States)

    Kitabchi, Gloria; And Others

    1979-01-01

    Several programs designed to meet the needs of mature women could be adapted to meet the special needs of the mature divorced woman. Career counseling for the divorced client must address the specific emotional factors involved in divorce, and aim toward total life planning, not simple adjustment to a life crisis and job placement. (Author)

  6. 78 FR 53424 - Agenda and Notice of Public Meeting of the West Virginia State Advisory Committee

    Science.gov (United States)

    2013-08-29

    ... an orientation meeting and planning meeting of the West Virginia State Advisory Committee to the... Time) on Tuesday, September 17, 2013. The purpose of the orientation meeting is to inform the newly... accessibility services should contact the Eastern Regional Office at least ten (10) working days before the...

  7. Second meeting of the ITPA Coordinating Committee

    International Nuclear Information System (INIS)

    Campbell, D.J.; Shimada, M.

    2002-01-01

    The second meeting of the International Tokamak Physics Activity (ITPA) Coordinating Committee (CC), consisting of representatives from the ITPA participants and the topical physics group chairs and co-chairs was held at GA Technologies, San Diego, USA on 1-2 March 2002. The purpose of the meeting was to review the progress of physics R and D, especially in the high priority research ares, for burning plasma experiments including ITER, and to discuss the plans for pursuing necessary R and D. CC heard reports on the most recent developments in the areas of responsibility of the topical groups

  8. 78 FR 27256 - Meeting of the California Desert District Advisory Council

    Science.gov (United States)

    2013-05-09

    ..., from 8 a.m. to 4:30 p.m. in Ridgecrest, Calif. at a location to be announced later. There also will be a DAC Business Meeting on Friday, June 7, from noon to 4:30 p.m. at the Jawbone Station Visitors... Saturday meeting will include a focus on the West Mojave Plan, as well as updates by council members, the...

  9. No Free Lunch: A Condensed Strategic Planning Process

    Science.gov (United States)

    Kohrmann, Patrick C., II

    2008-01-01

    Most people picture "strategic planning" as endless meetings spent doing SWOT (strengths, weaknesses, opportunities, and threats) analyses, crafting vision and mission statements, and developing goals and action plans. Few look forward to the experience or reflect back on it with pleasure. In this article, the author describes how he…

  10. A comparison of attribute sampling plans

    International Nuclear Information System (INIS)

    Lanning, B.M.

    1997-05-01

    This report describes, compares, and provides sample size selection criteria for the most common sampling plans for attribute data (i.e., data that is qualitative in nature such as Pass-Fail, Yes-No, Defect-Nondefect data). This report is being issued as a guide in prudently choosing the correct sampling plan to meet statistical plan objectives. The report discusses three types of sampling plans: AQL (Acceptable Quality Level expressed as a percent), RQL (Rejectable Quality Level as a percent), and the AQL/RQL plan which emphasizes both risks simultaneously. These plans are illustrated with six examples, one of which is an inventory of UF 6 cans whose weight must agree within 100 grams of its listed weight to be acceptable

  11. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  12. Proceedings of the second Atmospheric Radiation Measurement (ARM) Science Team Meeting

    International Nuclear Information System (INIS)

    1992-12-01

    The second Atmospheric Radiation Measurement (ARM) Science Team Meeting was held in Denver, Colorado, in October 1991. The five-day meeting provided a forum for a technical exchange among the members of the ARM Science Team and a discussion of the technical aspects of the project infrastructure. The meeting included several activities: Science Team presentations, discussions of the first site occupation plan, experiment design sessions, and poster sessions. This Proceedings document includes papers presented at the meeting. The papers included are those from the technical sessions, the experiment design sessions, the first site occupation, and descriptions of locales for future sites. Individual projects are processed separately for the database

  13. Summary Report of Third Research Coordination Meeting on Minor Actinide Nuclear Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Gunsing, Frank; Otsuka, Naohiko

    2010-12-01

    The Third Research Co-ordination Meeting of the MANREAD (Minor Actinides Neutron Reaction Data) Coordinated Research Project (CRP) was held at IAEA Headquarters in Vienna from 19 to 22 October 2010. A summary of the presentation, and the discussions which took place during the meeting, are reported here. In addition, a task assignment list of the experimental data assessment activities was agreed, and is provided together with the plan for future CRP activities. The Third Research Co-ordination Meeting of the MANREAD (Minor Actinides Neutron Reaction Data) Coordinated Research Project (CRP) was held at IAEA Headquarters in Vienna from 19 to 22 October 2010. A summary of the presentation, and the discussions which took place during the meeting, are reported here. In addition, a task assignment list of the experimental data assessment activities was agreed, and is provided together with the plan for future CRP activities. (author)

  14. Plans for Testing the NREL Unsteady Aerodynamics Experiment 10m Diameter HAWT in the NASA Ames Wind Tunnel: Minutes, Conclusions, and Revised Text Matrix from the 1st Science Panel Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Simms, D.; Schreck, S.; Hand, M.; Fingersh, L.; Cotrell, J.; Pierce, K.; Robinson, M.

    2000-08-28

    Currently, the NREL Unsteady Aerodynamics Experiment (UAE) research turbine is scheduled to enter the NASA Ames 80-ft x 120-ft wind tunnel in early 2000. To prepare for this 3-week test, a Science Panel meeting was convened at the National Wind Technology Center (NWTC) in October 1998. During this meeting, the Science Panel and representatives from the wind energy community provided numerous detailed recommendations regarding test activities and priorities. The Unsteady Aerodynamics team of the NWTC condensed this guidance and drafted a detailed test plan. This test plan represents an attempt to balance diverse recommendations received from the Science Panel meeting, while taking into account multiple constraints imposed by the UAE research turbine, the NASA Ames 80-ft x 120-ft wind tunnel, and other sources. The NREL-NASA Ames wind tunnel tests will primarily be focused on obtaining rotating blade pressure data. NREL has been making these types of measurements since 1987 and has considerable experience in doing so. The purpose of this wind tunnel test is to acquire accurate quantitative aerodynamic and structural measurements, on a wind turbine that is geometrically and dynamically representative of full-scale machines, in an environment free from pronounced inflow anomalies. These data will be exploited to develop and validate enhanced engineering models for designing and analyzing advanced wind energy machines.

  15. 78 FR 53424 - Agenda and Notice of Public Meeting of the New Jersey State Advisory Committee

    Science.gov (United States)

    2013-08-29

    ... an orientation meeting and planning meeting of the New Jersey State Advisory Committee to the... convene at 10:00 a.m. (ET) on Monday, September 23, 2013. The purpose of the orientation meeting is to... services should contact the Eastern Regional Office at least ten (10) working days before the scheduled...

  16. 78 FR 29135 - HIT Standards Committee Advisory Meeting

    Science.gov (United States)

    2013-05-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES HIT Standards Committee Advisory Meeting AGENCY: Office of...: HIT Standards Committee. General Function of the Committee: To provide recommendations to the National... Federal Health IT Strategic Plan, and in accordance with policies developed by the HIT Policy Committee...

  17. Eight meeting of the ITER diagnostic expert group

    International Nuclear Information System (INIS)

    Costley, A.E.; Young, K.M.

    1998-01-01

    The 8. Meeting of the ITER Diagnostics Expert Group which was held in San Diego, February 1998 had two main technical goals: to discuss the status and plans for developing kinetic control, and to review the current status of the design of the magnetic system

  18. 76 FR 64992 - Debt Management Advisory Committee; Meeting

    Science.gov (United States)

    2011-10-19

    ... from representatives of the financial community prior to making its final decisions on major financing... announcement of financing plans may not reflect the recommendations provided in reports of the Committee... the Committee meeting, following the release of a statement of economic conditions and financing...

  19. 15 CFR 923.24 - Shorefront access and protection planning.

    Science.gov (United States)

    2010-01-01

    ... allowable under state law or constitutional provisions, and an identification of public areas meeting that... “beach” and a planning process for the protection of, and access to, public beaches and other public... access and protection that the State's planning process indicates is necessary. ...

  20. MANAGEMENT BOARD MEETING OF 28 MAY 2002

    CERN Multimedia

    2002-01-01

    Medium-Term Plan The Director-General presented a preview of the Medium-Term Plan to be submitted to the Council and its committees in June for approval, outlining the limited but important changes and additions to the scientific and financial details with respect to those set out in the Preliminary Orientations document examined at the March meetings. New elements included, in particular, the 90 MCHF advance payment from Switzerland announced in March, an additional contribution from India, a shutdown of the PS in 2005, additional money for operations, additional CNGS costs and the reprofiling of LHC expenditure. He noted that the planning period concerned was the customary four years (2003-2006) but that a projection covering the whole LHC construction and debt repayment period until 2010 would also be provided. Although hard choices were still the order of the day, significant improvements in the planning had nevertheless been achieved since March thanks to various iterations of the planning figures combin...

  1. SSC San Diego Strategic Plan. Revision 2

    National Research Council Canada - National Science Library

    2000-01-01

    .... As an organization, we believe that strategic planning provides a critically needed context for adopting dynamic, agile processes to better use our corporate resources and meet our customers' needs...

  2. Geostatistics applied in mine production planning

    Energy Technology Data Exchange (ETDEWEB)

    Zerdin, F.; Markic, S.; Subelj, A. [NTF, Ljubljana (Slovenia)

    1998-07-01

    Long-term plan for lignite mine Velenje has been made by using a technical 'parametrisation' method where the basis for periodic, middle-term and short-term plans as well as for scheduling has already been fixed. Plans are presented by grade (heating value in GJ), quantity of ROM coal in tons and quantity of excavated material in cubic metre for each sequence of the seam or whole seam as well as for all working seams in the mines as a whole which correspond to a defined time period. Grade planning aims at achieving uniform product quality to meet contractual obligations. 17 refs., 10 figs.

  3. 48 CFR 352.270-1 - Accessibility of meetings, conferences, and seminars to persons with disabilities.

    Science.gov (United States)

    2010-10-01

    ...) The Contractor agrees as follows: (a) Planning. The Contractor shall develop a plan to assure that any... planning the meeting, conference, or seminar, shall include in all announcements and other materials... device for the deaf (TDD). (2) The Contractor shall provide, at no additional cost to the individual...

  4. 76 FR 57950 - Agenda and Notice of Public Meeting of the New Hampshire Advisory Committee

    Science.gov (United States)

    2011-09-19

    .... Commission on Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that a planning.... on Thursday, September 29, 2011. The purpose of the planning meeting is to plan future activities... information may contact the Eastern Regional Office at (202) 376-7533. Deaf or hearing-impaired persons who...

  5. Meeting the need: youth and family planning in sub-Saharan Africa.

    Science.gov (United States)

    Prata, Ndola; Weidert, Karen; Sreenivas, Amita

    2013-07-01

    The need for a concerted effort to address the gaps in family planning services for youth in sub-Saharan Africa has been underreported and underexplored. Trends in fertility, childbearing, unmet need for family planning options and contraceptive prevalence (CP) among youth are described with data from six African countries with four consecutive Demographic and Health Surveys. Estimates of exposure to risk of pregnancy and number of new contraceptives users needed to maintain and double CP in 2015 are calculated using current CP and projected youth population size in six African countries. The youth population is expected to range from approximately 3 to 35 million in six African countries by 2015. Accounting for population growth and current estimates of sexual activity among youth, family planning services will need to absorb more than 800,000 and 11.3 million new contraceptive users total to maintain and double CP, respectively, in 2015 in those six African countries alone. Our findings support existing literature that calls for a reorientation of family planning policies and programs, especially improved access to modern contraceptive methods among African youth. Copyright © 2013 Elsevier Inc. All rights reserved.

  6. Monitored retrievable storage program. Status and plans for meeting NWPA requirements

    International Nuclear Information System (INIS)

    Hall, R.J.; Fletcher, J.F.

    1983-12-01

    Accomplishments of the Monitored Retrieval Storage (MRS) Program since passage of the Nuclear Waste Policy Act of 1982 (NWPA) are as follows: (1) R and D needs report was submitted; (2) conceptual design analysis of 8 MRS concepts was performed; (3) selection of two MRS concepts (primary, alternative) are underway; (4) Parson/Westinghouse/Golder were selected as architect-engineer; (5) functional design criteria were established; (6) reports to accompany proposal were defined; and (7) evaluations of mission, cost-effectiveness, deployment time were performed. Future work, plans and schedule include completion of facility advanced conceptual design and accompanying design reports in early 1985, for submittal with proposal in June. Designs are being prepared for the primary concept, and in less detail, for the alternate. Three separate site locations will be assumed for each concept. A siting plan, to accompany the proposal, will also be completed in early 1985, as will an environmental assessment now under preparation. It is planned that the proposal be accompanied by several reports augmenting the planning base for post-proposal actions, to be activated at the time MRS deployment is authorized by Congress. 9 figures

  7. Climate plan 2004

    International Nuclear Information System (INIS)

    2004-01-01

    The Climate Plan is an action plan drawn up by the French Government to respond to the climate change challenge, first by 2010 (complying with the Kyoto Protocol target), and, secondly, beyond this date. Projections for France show that national emissions could be 10% higher than the Kyoto target in 2010 if no measures are taken. This is particularly due to increasing emissions in the sectors affecting daily life (residential-tertiary sectors, transport, etc.). For this reason, the Climate Plan contains measures affecting all sectors of the economy and the daily life of all French citizens with a view to economizing the equivalent of 54 million tonnes of CO 2 each year by the year 2010, which will help to reverse the trend significantly. Beyond 2010, the Climate Plan sets out a strategy for technological research which will enable France to meet a target of reducing greenhouse gas emissions four or fivefold by 2050. (author)

  8. A Revenue Planning Tool for Charter School Operators

    Science.gov (United States)

    Keller, Eric; Hayes, Cheryl D.

    2009-01-01

    This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…

  9. STANDING CONCERTATION COMMITTEE - ORDINARY MEETING ON 25 NOVEMBER 2002

    CERN Multimedia

    2002-01-01

    Original : English This meeting was devoted to follow-up from the Committee meetings in November and to the other main topics summarised below. 1. Follow-up from the meetings of the Finance Committee and TREF in November and preparation for the Committee meetings in December 2002 The SCC took note that the Finance Committee, held on 6 November, had recommended to apply the 2003 calculated salary adjustment index of 1.2%, and to approve the Management's proposed measures for containing the cost of hospital treatment within the CERN Health Insurance Scheme (CHIS). Related amendments to the CHIS Rules are being drawn up by the CHIS Supervisory Board in preparation for implementation next year. At its meeting on 15 November, TREF had expressed appreciation for the Management's preview of the Human Resources Plan 2003-2010 that is submitted to the Committees in December. The Forum had also discussed the Management's proposal document on Local Staff, as described below. 2. Local Staff After extensive debate at its ...

  10. STANDING CONCERTATION COMMITTEE ORDINARY MEETING ON 23 JUNE 1999

    CERN Multimedia

    1999-01-01

    Original: EnglishThis meeting of the SCC was devoted to the follow-up of the meetings of the Finance Committee and Council in June, to discussion of the voluntary programmes - including news from the Director-General on four extra RSL posts, and to other main items indicated below :Follow-up of the meetings of Finance Committee and Council in JuneThe Committee took note of the Chairman's report on these meetings and discussed follow-up actions in preparation for the next meeting of TREF on 24 September.Report from FC and Council meetingsThe Management concluded that work would continue on the basis of the planning and scope of the 5-yearly review as presented to the Committees (document CERN/TREF/127/Rev.2), in order to launch the data collection enquiry in external organisations this autumn. Emphasis would be given to the study of the career structure and recruitment-related aspects, whilst limiting data collection work on some other issues which had been examined in depth at the previous review in 1994/95. ...

  11. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  12. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  13. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  14. Eleventh ITER negotiations meeting (N-11) and twelfth negotiators' standing sub-group meeting (NSSG-12)

    International Nuclear Information System (INIS)

    Luo Delong

    2005-01-01

    The Eleventh ITER Negotiations Meeting (N-11) and the Twelfth Negotiators' Standing Sub-Group (NSSG-12 convened on October 19-25, 2005 at the Kempinski Hotel Chengdu, Sichuan Province. China was the host of this meeting. Delegations from China, the European Union, Japan, the Republic of Korea, the Russian Federation and the United States of America, as well as members from the International Team, met there to continue their work to reach agreement on the joint implementation of the ITER international fusion energy R and D project. The delegations accepted the Vice Minister of Science and Technology, Mr. LIU Yanhua, and State Councillor, Mr. SHI Dinghuan as Moderators for N-11 and NSSG-12, respectively, and Mr. LUO Delong as Secretary for both meetings. At the Meeting, delegates discussed and made substantial progress on a full range of legal, technical, and administrative topics, including staffing for ITER, policies for managing the project and its procurements, and the continuing joint drafting of the agreement on establishing the international ITER Organization to implement the project. Delegates also explored the possibility of India joining the Negotiations. In the light of the reports presented to the Meeting from the recent joint exploratory mission to India, delegates identified a series of steps for the near future leading towards a possible agreement among all the Parties to India's accession. The Negotiations Meeting also discussed the progress report of NSSG and forward planning and future tasks. The Negotiators agreed that substantial progress was made on all topics, and delegations are optimistic that the Joint Implementation Agreement and related Annexes and instruments could be initialed in spring of 2006. As decided by all delegations, the next Twelfth ITER Negotiations Meeting will be held in Korea on 6 December, 2005

  15. 78 FR 17634 - Agenda and Notice of Public Meetings of the Colorado Advisory Committee

    Science.gov (United States)

    2013-03-22

    ... Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that an orientation meeting... Room, Denver, CO 80202. The meetings are to conduct an orientation and for project planning. Members of... Regional Office at 303-866-1040. Persons needing accessibility services should contact the Rocky Mountain...

  16. MANAGEMENT BOARD MEETING OF 21st NOVEMBER 2002

    CERN Multimedia

    2002-01-01

    Outcome of the Finance Committee Meeting on 6th November 2002 The Director-General reported that, at its November meeting, the Finance Committee had discussed various elements of the 2003-2010 long-term plan, of which he had presented an oral preview prior to submission of the final version for approval in December. In that context, the Committee had examined a proposal on the indexation of the expenditure budget during the LHC construction period, expressing general support for the approach presented, as well as information on the use of LHC contingency. It had also taken note of the proposed arrangements for the loan from the European Investment Bank (EIB), recommending their approval by Council in December on the understanding that signature of the relevant agreement would be subject to approval of the long-term plan at the same Council session. In addition, the Finance Committee had recommended the Council to apply the 2003 cost-variation index, including the calculated salary adjustment index of 1.2%, an...

  17. 75 FR 47302 - Notice of FERC Attendance at the Entergy Regional State Committee Meeting, Entergy ICT...

    Science.gov (United States)

    2010-08-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Attendance at the Entergy Regional State Committee Meeting, Entergy ICT Tranmission Planning Summit and Entergy SPP RTO Planning... Orleans, 500 Canal Street, New Orleans, LA 70130, 504-525-2500. Entergy ICT Transmission Planning Summit...

  18. Collaborative Planning: Cooking up an Inclusive Service-Learning Project

    Science.gov (United States)

    Bonati, Michelle L.

    2018-01-01

    Collaborative planning between special education teachers and general education teachers that focuses on curriculum, instruction, and assessment can improve learning outcomes for students with and without disabilities. Service-learning is a teaching practice that can provide a flexible approach for teachers to collaboratively plan to meet the…

  19. 7 CFR 3560.626 - Affirmative Fair Housing Marketing Plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Affirmative Fair Housing Marketing Plan. 3560.626 Section 3560.626 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING... § 3560.626 Affirmative Fair Housing Marketing Plan. On-farm labor housing must meet the requirements of...

  20. China's population planning after Tiananmen.

    Science.gov (United States)

    Tien, H Y

    1990-09-01

    The author reports on the meeting of the China Demographic Society in Beijing in January 1990. The one-child policy is reviewed, and political changes that have taken place since the events in Tiananmen Square and their effect on the family planning policy are discussed.

  1. CEBAF - environmental protection program plan

    International Nuclear Information System (INIS)

    1995-01-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan

  2. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  3. EXPLICIT PLANNING FOR PARAGRAPH WRITING CLASS

    Directory of Open Access Journals (Sweden)

    Lestari Setyowati

    2017-11-01

    Full Text Available The purpose of the study is to improve the students writing ability for paragraph writing class. The subjects of the study were 37 students of English Education Study Program who joined the paragraph writing class. The design of the study was Classroom Action Research with two cycles. Cycle 1 consisted of three meetings, and cycle 2 consisted of two meetings. The types of explicit planning used in the action research were word listing and word mapping with phrases and sentence for detail.  The instruments used were direct writing test, observation, and  documentation of students’ reflective essay. To score the students’ writing, two raters  were asked to rate the composition by using Jacobs ESL Composition profile scoring rubric. The finding shows that the use of explicit planning was able to improve the students’ paragraph writing performance, indicated with the achievement of the criteria of success. The students’ mean improved from cycle 1 (74.62  to cycle2 (76.78. Although explicit planning instruction was able to help the students to write better, data from their self-reflection essay showed that many of the students preferred to use free writing instead of explicit planning instruction.

  4. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  5. Abstracts for the October 2012 meeting on Volcanism in the American Southwest, Flagstaff, Arizona

    Science.gov (United States)

    Lowenstern, Jacob B.

    2013-01-01

    Though volcanic eruptions are comparatively rare in the American Southwest, the States of Arizona, Colorado, New Mexico, Nevada, and Utah host Holocene volcanic eruption deposits and are vulnerable to future volcanic activity. Compared with other parts of the western United States, comparatively little research has been focused on this area, and eruption probabilities are poorly constrained. Monitoring infrastructure consists of a variety of local seismic networks, and ”backbone“ geodetic networks with little integration. Emergency response planning for volcanic unrest has received little attention by either Federal or State agencies. On October 18–20, 2012, 90 people met at the U.S. Geological Survey campus in Flagstaff, Arizona, providing an opportunity for volcanologists, land managers, and emergency responders to meet, converse, and begin to plan protocols for any future activity. Geologists contributed data on recent findings of eruptive ages, eruption probabilities, and hazards extents (plume heights, ash dispersal). Geophysicists discussed evidence for magma intrusions from seismic, geodetic, and other geophysical techniques. Network operators publicized their recent work and the relevance of their equipment to volcanic regions. Land managers and emergency responders shared their experiences with emergency planning for earthquakes. The meeting was organized out of the recognition that little attention had been paid to planning for or mitigation of volcanic hazards in the American Southwest. Moreover, few geological meetings have hosted a session specifically devoted to this topic. This volume represents one official outcome of the meeting—a collection of abstracts related to talks and poster presentations shared during the first two days of the meeting. In addition, this report includes the meeting agenda as a record of the proceedings. One additional intended outcome will be greater discussion and coordination among emergency responders, geologists

  6. 36 CFR 228.4 - Plan of operations-notice of intent-requirements.

    Science.gov (United States)

    2010-07-01

    ... meet the requirements for environmental protection in § 228.8. (d) The plan of operations shall cover... disturbance not covered by the initial plan. (e) At any time during operations under an approved plan of...), resulting in varying degrees of disturbance to vegetative resources, soil, water, air, or wildlife. The...

  7. Demand and capacity planning in the emergency department: how to do it.

    Science.gov (United States)

    Higginson, I; Whyatt, J; Silvester, K

    2011-02-01

    Unless emergency departments have adequate capacity to meet demand, they will fail to meet clinical and performance standards and will be operating in the 'coping zone'. This carries risks both for staff and patients. As part of a quality improvement programme, the authors undertook an in-depth analysis of demand and capacity for an emergency department in the UK. The paper describes this rigorous approach to capacity planning, which draws on techniques from other industries. Proper capacity planning is vital, but is often poorly done. Planning using aggregated data will lead to inadequate capacity. Understanding demand, and particularly the variation in that demand, is critical to success. Analysis of emergency department demand and capacity is the first step towards effective workforce planning and process redesign.

  8. Eighteenth LAMPF users group meeting: proceedings

    International Nuclear Information System (INIS)

    Bradbury, J.N.

    1985-03-01

    The Eighteenth Annual LAMPF Users Group Meeting was held October 29-30, 1984, at the Clinton P. Anderson Meson Physics Facility. The program included a number of invited talks on various aspects of nuclear and particle physics as well as status reports on LAMPF and discussions of upgrade options. The LAMPF working groups met and discussed plans for the secondary beam lines, experimental programs, and computing facilities

  9. 78 FR 9724 - Invasive Species Advisory Committee; Meetings

    Science.gov (United States)

    2013-02-11

    ..., on a broad array of issues related to preventing the introduction of invasive species and providing... outlined in the 2008-2012 National Invasive Species Management Plan. The meeting agenda is now available on... be no committee business conducted during the orientation session, which is closed to the public...

  10. 77 FR 43065 - National Assessment Governing Board; Meeting

    Science.gov (United States)

    2012-07-23

    ... materials for the NAEP 2014 Technology and Engineering Literacy Assessment at grade 8. During the closed... procurement plans for conducting an evaluation of the NAEP achievement levels. COSDAM oversees the development... evaluation. This part of the meeting must be conducted in closed session because the solicitation has not...

  11. Village family planning volunteers in Indonesia: their role in the family planning programme.

    Science.gov (United States)

    Utomo, Iwu Dwisetyani; Arsyad, Syahmida S; Hasmi, Eddy Nurul

    2006-05-01

    Family planning was once a sensitive issue in Indonesia, but today it is considered essential. This paper reports on a study in 1997-98 of the role of village family planning volunteers and the cadres who worked under them in West Java, Central Java and DI Yogyakarta, in implementing the national family planning programme in Indonesia. A total of 108 village family planning volunteers, 108 family planning cadres, 108 local leaders and 324 couples eligible for family planning from 36 villages in the three provinces were interviewed. The volunteers and cadres have made a significant contribution to the implementation of the family planning programme. They promote family planning, organise meetings, provide information, organise income-generation activities, give savings and credit assistance, collect and report data and deliver other family welfare services. Teachers, wives of government officials and others recognised by the community as better off in terms of education and living conditions were most often identified to become family planning volunteers. Because they are women and because they are the most distant arm of the programme, their work is taken for granted. As their activities are directed towards women, especially in women's traditional roles, the programme tends to entrench the existing gender gap in responsibility for family planning and family welfare.

  12. Report of the first interim meeting of the Seabed Working Group Engineering Studies Task Group

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1982-02-01

    The first interim meeting of the Engineering Studies Task Group (ESTG) was held at the Delft Soil Mechanics Laboratory, Delft, The Netherlands, on 21-24 September 1981. The main business of the meeting was the development of a network analysis for the ESTG. Significant progress was made; however, substantial further development remains to be accomplished. Other items discussed were (1) progress relevant to engineering studies made in the various national programs since the sixth annual meeting of the Seabed Working Group (SWG) held in Paris, February, 1981; (2) the ESTG Boundary Conditions and Scope of Work as previously defined at the Paris meeting; (3) the Draft II SWG Five-Year Plan; (4) the deep ocean drilling proposal made by the Site Selection Task Group at the Paris meeting and expanded upon at their May, 1981, meeting; and (5) a recent compilation of data from the Nares Abyssal Plain arising from the US Program studies. Finally, consideration was given to a plan for continued work by the ESTG. A brief discussion of the principal items is given. The current state of the network analysis is shown

  13. 77 FR 38273 - Science Advisory Board; Meeting

    Science.gov (United States)

    2012-06-27

    ... will be limited to a total time of five (5) minutes. Individuals or groups planning to make a verbal... Advisory Board (SAB) was established by a Decision Memorandum dated September 25, 1997, and is the only... management. Time and Date: The meeting will be held Monday, July 16, 2012 from 9 a.m. to 5:30 p.m. and...

  14. Guam Transportation Petroleum-Use Reduction Plan

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, C.

    2013-04-01

    The island of Guam has set a goal to reduce petroleum use 20% by 2020. Because transportation is responsible for one-third of on-island petroleum use, the Guam Energy Task Force (GETF), a collaboration between the U.S. Department of Energy and numerous Guam-based agencies and organizations, devised a specific plan by which to meet the 20% goal within the transportation sector. This report lays out GETF's plan.

  15. Proceedings of the Annual Precise Time and Time Interval (PTTI) applications and Planning Meeting (20th) Held in Vienna, Virginia on 29 November-1 December 1988

    Science.gov (United States)

    1988-12-01

    Metrologia 20, p...6: FTS168 of Aerospace 46 * HOl C -. ALA 0 * F-OH - - t- F-OF A - I U 0 ____________ 12 LA ALA LAW 1) Sc C 0 C S ~ A SN 𔃻 LA -~ 0 C., LA NE LLV ~ ’I...Cj E ~ -0--H -3 C-C -~ I -,~O : ~ ., LA 0 E 0 0 C LI 1A LA * ~p~~LI0L LA ~ (’A 0 - ~ .. LA Li S AC a Li - ’-I C LI. C 0 C N AL LA C- - -A - LAI I I

  16. 77 FR 62218 - Pacific Fishery Management Council; Public Meetings

    Science.gov (United States)

    2012-10-12

    .... Preseason Salmon Management Schedule for 2013 3. 2012 Salmon Methodology Review D. Habitat 1. Current... Operating Procedures 4. Future Council Meeting Agenda and Workload Planning G. Coastal Pelagic Species... people with disabilities. Requests for sign language interpretation or other auxiliary aids should be...

  17. 77 FR 22332 - Center for Scientific Review; Notice of Meeting

    Science.gov (United States)

    2012-04-13

    ... meeting will be open to the public with attendance limited to space available. Individuals who plan to... Advisory Committee Policy. [FR Doc. 2012-8919 Filed 4-12-12; 8:45 am] BILLING CODE 4140-01-P ...

  18. 78 FR 19497 - Center for Scientific Review; Notice of Meeting

    Science.gov (United States)

    2013-04-01

    ... meeting will be open to the public, with attendance limited to space available. Individuals who plan to..., Program Analyst, Office of Federal Advisory Committee Policy. [FR Doc. 2013-07419 Filed 3-29-13; 8:45 am...

  19. 77 FR 59202 - Center for Scientific Review; Notice of Meeting

    Science.gov (United States)

    2012-09-26

    ... meeting will be open to the public, with attendance limited to space available. Individuals who plan to... Advisory Committee Policy. [FR Doc. 2012-23624 Filed 9-25-12; 8:45 am] BILLING CODE 4140-01-P ...

  20. The Waypoint Planning Tool: Real Time Flight Planning for Airborne Science

    Science.gov (United States)

    He, M.; Goodman, H. M.; Blakeslee, R.; Hall, J. M.

    2010-12-01

    NASA Earth science research utilizes both spaceborne and airborne real time observations in the planning and operations of its field campaigns. The coordination of air and space components is critical to achieve the goals and objectives and ensure the success of an experiment. Spaceborne imagery provides regular and continual coverage of the Earth and it is a significant component in all NASA field experiments. Real time visible and infrared geostationary images from GOES satellites and multi-spectral data from the many elements of the NASA suite of instruments aboard the TRMM, Terra, Aqua, Aura, and other NASA satellites have become norm. Similarly, the NASA Airborne Science Program draws upon a rich pool of instrumented aircraft. The NASA McDonnell Douglas DC-8, Lockheed P3 Orion, DeHavilland Twin Otter, King Air B200, Gulfstream-III are all staples of a NASA’s well-stocked, versatile hangar. A key component in many field campaigns is coordinating the aircraft with satellite overpasses, other airplanes and the constantly evolving, dynamic weather conditions. Given the variables involved, developing a good flight plan that meets the objectives of the field experiment can be a challenging and time consuming task. Planning a research aircraft mission within the context of meeting the science objectives is complex task because it is much more than flying from point A to B. Flight plans typically consist of flying a series of transects or involve dynamic path changes when “chasing” a hurricane or forest fire. These aircraft flight plans are typically designed by the mission scientists then verified and implemented by the navigator or pilot. Flight planning can be an arduous task requiring frequent sanity checks by the flight crew. This requires real time situational awareness of the weather conditions that affect the aircraft track. Scientists at the University of Alabama-Huntsville and the NASA Marshall Space Flight Center developed the Waypoint Planning Tool

  1. Randomized prospective study comparing tri-cortical iliac crest autograft to allograft in the lateral column lengthening component for operative correction of adult acquired flatfoot deformity.

    Science.gov (United States)

    Dolan, Christopher M; Henning, Jeffrey A; Anderson, John G; Bohay, Donald R; Kornmesser, Marc J; Endres, Terrence J

    2007-01-01

    Operative treatment of stage II posterior tibial tendon insufficiency (PTTI) is controversial. Many soft-tissue and bony procedures and various combinations of the two have been reported for treatment of stage II PTTI. Orthopaedists recognize the lateral column lengthening component of the procedure as a successful reconstructive technique. The use of cortical allograft for lateral column lengthening in the correction of pes planus in the pediatric patient population has been routine. In the adult population, however, tricortical iliac crest autograft has been the bone graft of choice. Harvest of this autograft can precipitate significant morbidity and cost. Therefore, we undertook this randomized controlled trial to compare graft incorporation and healing of allograft and autograft in the lateral column lengthening component of adult flatfoot reconstruction. Lateral column lengthening was done as a component of operative correction for stage II PTTI in adult patients (older than 18 years) by two surgeons using similar procedures. The patients were randomized to either the allograft or autograft procedures. The primary endpoint was graft incorporation and healing as assessed by radiographs. The study included 33 randomized feet in 31 patients. We followed 18 feet in the allograft group and 15 in the autograft group to the point of union. There were 21 women and 10 men. There were no delayed unions, nonunions, or hardware failures. All patients in both groups achieved bony union by the 12-week followup evaluation. Two superficial foot infections were successfully treated with oral antibiotics. Two patients in the autograft group continued to have hip donor site pain at 3 months. This study suggests that union rates of allograft and autograft (iliac crest bone graft) are equal. The use of allograft in the lateral column lengthening component of operative correction of adult stage II PTTI appears to be a viable alternative to the use of iliac crest autograft and

  2. Proceedings of the 30th Annual Precise Time and Time Interval (PTTI) Systems and Applications Meeting

    Science.gov (United States)

    1999-01-01

    roa.es C. Tomis RedIRIS, Centro Comunicaciones CSIC RedIRIS Serrano 142, 28006 Madrid, Spain tel + 34-91-585-5150 fax +34-91-564-7421 e-mail...I&D) and managed by the Centro de Comunicaciones CSIC RedIRIS, which depends on the Scientific Research Council (Consejo Superior de Investigaciones

  3. Joining up health and planning: how Joint Strategic Needs Assessment (JSNA) can inform health and wellbeing strategies and spatial planning.

    Science.gov (United States)

    Tomlinson, Paul; Hewitt, Stephen; Blackshaw, Neil

    2013-09-01

    There has been a welcome joining up of the rhetoric around health, the environment and land use or spatial planning in both the English public health white paper and the National Planning Policy Framework. However, this paper highlights a real concern that this is not being followed through into practical guidance needed by local authorities (LAs), health bodies and developers about how to deliver this at the local level. The role of Joint Strategic Needs Assessments (JSNAs) and Health and Wellbeing Strategies (HWSs) have the potential to provide a strong basis for integrated local policies for health improvement, to address the wider determinants of health and to reduce inequities. However, the draft JSNA guidance from the Department of Health falls short of providing a robust, comprehensive and practical guide to meeting these very significant challenges. The paper identifies some examples of good practice. It recommends that action should be taken to raise the standards of all JSNAs to meet the new challenges and that HWSs should be aligned spatially and temporally with local plans and other LA strategies. HWSs should also identify spatially targeted interventions that can be delivered through spatial planning or transport planning. Steps need to be taken to ensure that district councils are brought into the process.

  4. Airport Surface Traffic Control Visual Ground Aids Engineering and Development Plan

    Science.gov (United States)

    1977-01-01

    The plan described in this document supports the overall program at the Transportation Systems Center to define, design, develop, and evaluate systems that meet the requirements of airport surface traffic control. This plan is part of documentation s...

  5. AECB strategic plan 1999

    International Nuclear Information System (INIS)

    1999-03-01

    This strategic plan provides the direction and focus required to successfully carry out our mandate in an efficient and effective manner over the next two to three years. It gives broad corporate direction by identifying where efforts need to be focussed, and therefore provides guidance for setting priorities and allocating resources. While we cannot ignore any aspect of our mandate, we must recognize that we will always have more work to do than can be accomplished within the resources available to us. Therefore we must set priorities and develop appropriate management systems to ensure that our major efforts and our resources are being directed towards those priorities. Our strategic plan is not a static document. We will always be faced with new challenges, and our strategies for meeting those challenges will also have to change. Therefore our strategic plan must be seen as a guide that reflects both the ever-changing environment and our ability to deal with new or evolving changes effectively. This plan is not intended to be a detailed operational plan. Each directorate must develop its own operational plans and procedures based on the directions in this strategic plan, and on corporate priorities and policies. (author)

  6. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Duvon, D. K.

    1998-01-01

    This plan contains the Pollution Prevention (P2) Program for the Environmental Restoration Contractor (ERC). The plan outlines the activities and schedules developed by the Bechtel Hanford, Inc.(BHI) to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. The purpose of this plan is to guide ERC projects in meeting and documenting compliance with requirements for pollution prevention. This plan contains the objectives, strategy, and support activities of the ERC P2 Program

  7. Comet Kohoutek, The Arab Oil Embargo, and the Jan 1974 AAS Meeting

    Science.gov (United States)

    Duncan, D. K.

    1999-05-01

    An unlikely combination of factors, including Comet Kohoutek and the Arab Oil embargo, combined to make my first AAS Meeting my most memorable. Three young graduate students confronted lack of gas, lack of money, and lack of planning to attend the Jan 1974 meeting in Tucson, AZ. One, Steve Hawley, displayed skills which would later be valuable when he became the astronaut who launched HST. Although we became stranded in the desert, two of the three of us made it to the meeting, and only one didn't....

  8. Guam Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  9. Collective Travel Planning in Spatial Networks

    KAUST Repository

    Shang, Shuo; Chen, Lisi; Wei, Zhewei; Jensen, Christian S.; Wen, Ji-Rong; Kalnis, Panos

    2017-01-01

    We propose and investigate a novel query, the Collective Travel Planning (CTP) query, that finds the lowest-cost route connecting multiple query sources and a destination via at most k meeting points. This type of query is useful in organizing large

  10. 78 FR 35055 - Advisory Committee on the Records of Congress; Meeting

    Science.gov (United States)

    2013-06-11

    ... full range of programs, policies, and plans for the Center for Legislative Archives in the Office of Legislative Archives, Presidential Libraries, and Museum Services (LPM). This meeting will take place at the...

  11. 77 FR 35430 - Advisory Committee on the Records of Congress; Meeting

    Science.gov (United States)

    2012-06-13

    ... full range of programs, policies, and plans for the Center for Legislative Archives in the Office of Legislative Archives, Presidential Libraries, and Museum Services (LPM). The meeting is open to the public...

  12. Second negotiation meeting on the joint implementation of ITER

    International Nuclear Information System (INIS)

    Okumura, Y.

    2002-01-01

    The second negotiation meeting on the joint implementation of ITER was held in Tokyo(Japan) on 22-23 January 2002 to continue formal negotiations on the joint implementation of the ITER project. The delegations from Japan, European Union, Canada and Russia reached common understanding on some of the Joint Implementation Agreement (JIA) related issues. The delegations requested the Negotiators' Standing Subgroup (NSSG) to further elaborate the draft JIA and to submit second draft to the third Negotiation Meeting. The delegations accepted the revised Work Plan and Milestones for the negotiations process

  13. 76 FR 76769 - National Science Board; Sunshine Act Meetings

    Science.gov (United States)

    2011-12-08

    ... matters specified, as follows: AGENCY HOLDING MEETING: National Science Board DATE AND TIME: Monday.../notices/ . AGENCY CONTACT: Jennie L. Moehlmann, [email protected] , (703) 292-7000. PUBLIC AFFAIRS CONTACT... STEM education plan. Discussion of the NSF STEM education research portfolio: getting from theory to...

  14. PM2006: a highly scalable urban planning management information system--Case study: Suzhou Urban Planning Bureau

    Science.gov (United States)

    Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie

    2008-10-01

    During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.

  15. Sales plan generation problem on TV broadcasting

    Directory of Open Access Journals (Sweden)

    Özlem Cosgun

    2016-07-01

    Full Text Available Major advertisers and/or advertisement agencies purchase hundreds of slots during a given broadcast period. Deterministic optimization approaches have been well developed for the problem of meeting client requests. The challenging task for the academic research currently is to address optimization problem under uncertainty. This paper is concerned with the sales plan generation problem when the audience levels of advertisement slots are random variables with known probability distributions. There are several constraints the TV networks must meet including client budget, product category and demographic information, plan weighting by week, program mix requirements, and the lengths of advertisement slots desired by the client. We formulate the problem as a chance constrained goal program and we demonstrate that it provides a robust solution with a user specified level of reliability.

  16. Review of Meeting Objectives

    International Nuclear Information System (INIS)

    Braams, B.J.; Chung, H.-K.

    2011-01-01

    This is the 21st meeting of the International Atomic and Molecular Data Centres Network. The traditional DCN meeting objectives are: to exchange information about activities in the Centres and review progress; to coordinate work in the Centres; to assess priorities in data evaluation and data production; to make plans for specific evaluations; and to evaluate and revise procedures for collection and exchange of bibliographical and numerical data. All of these are objectives for the present meeting too. In addition to the presentations from DCN and prospective DCN members we have two participants from outside the field of fusion data: Dr N. Mason will tell us about coordination of the Virtual Atomic and Molecular Data Centre and Dr S. Simakov will describe the manner in which nuclear structure and cross-section database development is coordinated by our colleagues in the Nuclear Data Section. In the discussions on Thursday and Friday there are two topics that need special attention this year: the future of our bibliographical data compilation and ways in which we can strengthen data evaluation activities, all with emphasis on collision processes and plasma-material interaction. The first 3 Data Centre Network meetings were held in 1977, 1980 and 1982 and the reports of those meetings make interesting reading and can still provide inspiration for the present meeting. I show some excerpts in the presentation. In 1977 the emphasis was on the coordination of the bibliographical database, AMBDAS, and a collision data index, CIAMDA, as the initial activities of the Network and of the newly formed IAEA A+M Data Unit. In 1980 the central topic of discussion at the meeting shifted to the numerical database and to data evaluation. The Network recommended that numerical data be reviewed by a selected group of scientists and that no unevaluated numerical A+M collision data should be distributed by the IAEA. The report of the meeting in 1982 shows that the bibliographical

  17. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  18. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  19. Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    McGinnis and Associates LLC

    2008-08-01

    The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Big Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.

  20. Tank Waste Remediation System Tank Waste Analysis Plan. FY 1995

    International Nuclear Information System (INIS)

    Haller, C.S.; Dove, T.H.

    1994-01-01

    This documents lays the groundwork for preparing the implementing the TWRS tank waste analysis planning and reporting for Fiscal Year 1995. This Tank Waste Characterization Plan meets the requirements specified in the Hanford Federal Facility Agreement and Consent Order, better known as the Tri-Party Agreement

  1. Implementing Family Meetings Into a Respiratory Care Unit: A Care and Communication Quality Improvement Project.

    Science.gov (United States)

    Loeslie, Vicki; Abcejo, Ma Sunnimpha; Anderson, Claudia; Leibenguth, Emily; Mielke, Cathy; Rabatin, Jeffrey

    Substantial evidence in critical care literature identifies a lack of quality and quantity of communication between patients, families, and clinicians while in the intensive care unit. Barriers include time, multiple caregivers, communication skills, culture, language, stress, and optimal meeting space. For patients who are chronically critically ill, the need for a structured method of communication is paramount for discussion of goals of care. The objective of this quality improvement project was to identify barriers to communication, then develop, implement, and evaluate a process for semistructured family meetings in a 9-bed respiratory care unit. Using set dates and times, family meetings were offered to patients and families admitted to the respiratory care unit. Multiple avenues of communication were utilized to facilitate attendance. Utilizing evidence-based family meeting literature, a guide for family meetings was developed. Templates were developed for documentation of the family meeting in the electronic medical record. Multiple communication barriers were identified. Frequency of family meeting occurrence rose from 31% to 88%. Staff satisfaction with meeting frequency, meeting length, and discussion of congruent goals of care between patient/family and health care providers improved. Patient/family satisfaction with consistency of message between team members; understanding of medications, tests, and dismissal plan; and efficacy to address their concerns with the medical team improved. This quality improvement project was implemented to address the communication gap in the care of complex patients who require prolonged hospitalizations. By identifying this need, engaging stakeholders, and developing a family meeting plan to meet to address these needs, communication between all members of the patient's care team has improved.

  2. 78 FR 61361 - The President's Management Advisory Board (PMAB); Notification of Upcoming Public Advisory Meeting

    Science.gov (United States)

    2013-10-03

    ... operations. The meeting will also cover planning and logistics for PMAB during the coming year. Meeting... the PMAB discussion using 1-888-673-9806 and pass code 7836092. Members of the public will not have...: Electronic or Paper Statements: Submit electronic statements to Mr. Brockelman, Designated Federal Officer at...

  3. 75 FR 33763 - Agenda and Notice of Public Meeting of the New Hampshire Advisory Committee

    Science.gov (United States)

    2010-06-15

    .... Commission on Civil Rights and the Federal Advisory Committee Act that a planning meeting of the New... COMMISSION ON CIVIL RIGHTS Agenda and Notice of Public Meeting of the New Hampshire Advisory...'s work on gender disparities in New Hampshire prisons. Members of the public are entitled to submit...

  4. 78 FR 41114 - NASA Advisory Council; Aeronautics Committee; Meeting

    Science.gov (United States)

    2013-07-09

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 13-075] NASA Advisory Council; Aeronautics... Aeronautics and Space Administration announces a meeting of the Aeronautics Committee of the NASA Advisory... planning. DATES: Tuesday, July 30, 2013, 9:00 a.m. to 5:00 p.m.; Local Time. ADDRESSES: NASA Headquarters...

  5. 77 FR 62242 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2012-10-12

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... Person: Lee L. Zwanziger, Risk Communication Staff, Office of Planning, Food and Drug Administration...

  6. General meeting of the Pension Fund

    CERN Multimedia

    HR Department

    2009-01-01

    All members and beneficiaries of the Pension Fund are invited to attend the Annual General Meeting to be held in the CERN Council Room on Wednesday 9 September 2009 from 14:00 to 16:30 p.m. The Agenda comprises: 1.\tOpening Remarks - F. Ferrini 2.\tResults and presentation of the Annual Report 2008. - C. Cuénoud Recent evolution of financial markets. 2009-2010 work plan - T. Economou. Copies of the 2008 Report are available from departmental secretariats. 3.\tReport on Funding policy and principles of the Pension Fund: Working Group 2 Report. - F. Ferrini 4.\tQuestions from members or beneficiaries Persons wishing to ask questions are encouraged to submit them, where possible, in writing in advance, addressed to the secretariat of the Pension Fund. 5.\tConclusions - F. Ferrini As usual, participants are invited to drinks after the Meeting. NB\tThe minutes of the 2008 General Meeting are available from the Administration of the Fund (tel. + 41 22 767 27 42 ; e-mail mailto:Sevda.Budun-Kocaturk@cern.ch

  7. General Meeting Of The Pension Fund

    CERN Multimedia

    HR Department

    2009-01-01

    All members and beneficiaries of the Pension Fund are invited to attend the Annual General Meeting to be held in the CERN Council Chamber on Wednesday 9 September 2009 from 14:00 to 16:30 p.m. The Agenda comprises: 1.\tOpening Remarks - F. Ferrini 2.\tResults and presentation of the Annual Report 2008. - C. Cuénoud Recent evolution of financial markets. 2009-2010 work plan - T. Economou. Copies of the 2008 Report are available from Departmental secretariats. 3.\tReport on funding policy and principles of the Pension Fund: Working Group 2 Report. - F. Ferrini 4.\tQuestions from members and beneficiaries Persons wishing to ask questions are encouraged to submit them, where possible, in writing in advance, addressed to the Secretariat of the Pension Fund. 5.\tConclusions - F. Ferrini As usual, participants are invited to drinks after the meeting. NB\tThe minutes of the 2008 General Meeting are available from the Administration of the Fund (tel. + 41 22 767 27 42 ; e-mail mailto:Sevda.Budun-Kocaturk@cern.ch

  8. General meeting of the Pension Fund

    CERN Multimedia

    HR Department

    2009-01-01

    All members and beneficiaries of the Pension Fund are invited to attend the Annual General Meeting to be held in the CERN Council Room on Wednesday 9 September 2009 from 14:00 to 16:30 p.m. The Agenda comprises: 1.\tOpening Remarks - F. Ferrini 2.\tResults and presentation of the Annual Report 2008. - C. Cuénoud Recent evolution of financial markets. 2009-2010 work plan - T. Economou. Copies of the 2008 Report are available from departmental secretariats. 3.\tReport on Funding policy and principles of the Pension Fund: Working Group 2 Report. - F. Ferrini 4.\tQuestions from members or beneficiaries Persons wishing to ask questions are encouraged to submit them, where possible, in writing in advance, addressed to the secretariat of the Pension Fund. 5.\tConclusions - F. Ferrini As usual, participants are invited to drinks after the Meeting. NB\tThe minutes of the 2008 General Meeting are available from the Administration of the Fund (tel. + 41 22 767 27 42 ; e-mail mailto:Sevda.Budun-Kocaturk@cern.ch)

  9. Results of the 76th meeting of the Council on Power Resource Development and Adjustment

    International Nuclear Information System (INIS)

    Sasaki, Koichi

    1979-01-01

    To the decisions concerning the power resource development plans in fiscal 1978 decided in the 75th meeting, revision was made in the 76th meeting of the Council on Power Resource Development and Adjustment. In the original plans; during 8 years from fiscal 1978, the power plants of a total of 71,100 MW will be completed; and for fiscal 1978, 41,250 MW is developed consecutively, while and 3,150 MW is developed newly. 6 hydraulic stations, 18 thermal stations and 2 nuclear stations of 1,990 MW are planned. According to revision, 2,800 MW developed newly at 1 hydraulic, 2 thermal and/nuclear sites was newly incorporated in the plan. As for nuclear power generation, in The Chubu Electric Power Co., Ltd., Unit 3 of BWR type with 1,100 MW is added to the Hamaoka Nuclear Power Station. (Mori, K.)

  10. Transmission planning in a deregulated environment

    DEFF Research Database (Denmark)

    Xu, Zhao

    2006-01-01

    The worldwide trend for the deregulation of the electricity generation and transmission industries has led to dramatic changes in system operation and planning procedures. The optimum approach to transmission-expansion planning in a deregulated environment is an open problem especially when the r...... electricity market grid are performed. In addition, the proposed method is compared with a traditional planning method to further verify its effectiveness....... the responsibilities of the organisations carrying out the planning work need to be addressed. To date there is a consensus that the system operator and network manager perform the expansion planning work in a centralised way. However, with an increasing input from the electricity market, the objectives, constraints...... and approaches toward transmission planning should be carefully designed to ensure system reliability as well as meeting the market requirements. A market-oriented approach for transmission planning in a deregulated environment is proposed. Case studies using the IEEE 14-bus system and the Australian national...

  11. For information MANAGEMENT BOARD MEETING OF 26 APRIL 2001

    CERN Document Server

    2001-01-01

    The Management Board's meeting on 26 April was essentially devoted to discussion of the Organization's medium-term plan, to be set out in the document 'Scientific Activities of CERN and Budget Estimates for the Years 2002-2005' and presented to the Council and its committees for approval in June, after submission of a preliminary draft to the Scientific Policy Committee (SPC) at its meeting on 7 May. The Director-General reviewed the main changes with respect to last year's plan and indicated that the document would take into account a number of significant developments over the past twelve months, which had enabled the Management to build up a much clearer picture of the Laboratory's medium-term future. These included the final closure of LEP, the completion of the Five-Yearly Remuneration Review, the elaboration of a LHC final machine and detector commissioning schedule, and, more recently, the completion of the LHC Computing Review. The conclusions and recommendations of the latter review would be presente...

  12. Marketing Plan for the National Security Technology Incubator

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-03-31

    This marketing plan was developed as part of the National Security Preparedness Project by the Arrowhead Center of New Mexico State University. The vision of the National Security Technology Incubator program is to be a successful incubator of technologies and private enterprise that assist the NNSA in meeting new challenges in national safety and security. The plan defines important aspects of developing the incubator, such as defining the target market, marketing goals, and creating strategies to reach the target market while meeting those goals. The three main marketing goals of the incubator are: 1) developing marketing materials for the incubator program; 2) attracting businesses to become incubator participants; and 3) increasing name recognition of the incubator program on a national level.

  13. MANAGEMENT BOARD MEETING OF 20 MAY 1999

    CERN Document Server

    1999-01-01

    For informationOutcome of the May Meeting of the Scientific Policy CommitteeThe Director-General reported that the Scientific Policy Committee had extensively examined the draft medium-term plan 'The Scientific Activities of CERN and Budget Estimates for the Years 2000-2003' at its meeting on 10 May and that a final version taking account of observations made was now being prepared for submission to the Council at its June session for approval. In addition, following detailed discussion of a written proposal concerning the long-baseline neutrino beam from CERN to Gran Sasso, the NGS facility, the Committee had expressed support for the project and was preparing a recommendation to be presented to the Committee of Council the following month.Preparation for the June Meetings of the Scientific Policy Committee, Finance Committee and Committee of Council and for the June Council SessionThe Director-General outlined the main issues to be addressed by the Council and its committees in June. In addition to the two ...

  14. 78 FR 67131 - Notice of Advisory Committee Closed Meeting; U.S. Strategic Command Strategic Advisory Group

    Science.gov (United States)

    2013-11-08

    ... purpose of the meeting is to provide advice on scientific, technical, intelligence, and policy-related..., Weapons of Mass Destruction, Intelligence Operations, Cyber Operations, Global Strike, Command and Control... discussed at a planned meeting, then these statements must be submitted no later than five business days...

  15. Healthcare succession planning: an integrative review.

    Science.gov (United States)

    Carriere, Brian K; Muise, Melanie; Cummings, Greta; Newburn-Cook, Chris

    2009-12-01

    Succession planning is a business strategy that has recently gained attention in the healthcare literature, primarily because of nursing shortage concerns and the demand for retaining knowledgeable personnel to meet organizational needs. Little research has been conducted in healthcare settings that clearly defines best practices for succession planning frameworks. To effectively carry out such organizational strategies during these challenging times, an integrative review of succession planning in healthcare was performed to identify consistencies in theoretical approaches and strategies for chief nursing officers and healthcare managers to initiate. Selected articles were compared with business succession planning to determine whether healthcare strategies were similar to best practices already established in business contexts. The results of this integrative review will aid leaders and managers to use succession planning as a tool in their recruitment, retention, mentoring, and administration activities and also provide insights for future development of healthcare succession planning frameworks.

  16. Tactical resource allocation and elective patient admission planning in care pathways

    NARCIS (Netherlands)

    Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and

  17. Tactical resource allocation and elective patient admission planning in care processes

    NARCIS (Netherlands)

    Hulshof, P.J.H.; Boucherie, Richardus J.; Hans, Elias W.; Hurink, Johann L.

    2013-01-01

    Tactical planning of resources in hospitals concerns elective patient admission planning and the intermediate term allocation of resource capacities. Its main objectives are to achieve equitable access for patients, to meet production targets/to serve the strategically agreed number of patients, and

  18. Treatment Algorithm for the Hypertension Specialist after the Milan Meeting in 2007

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana

    2007-01-01

    Roč. 30 (2007), s. 374-374 ISSN 1420-4096. [Central European Meeting on Hypertension and Cardiovascular Disease Prevention. 11.10.2007-13.10.2007, Kraków] R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : hypertension specialist * treatment algorithm for the hypertension * treatment after the Milan Meeting in 2007 Subject RIV: FA - Cardiovascular Disease s incl. Cardiotharic Surgery

  19. MANAGEMENT BOARD MEETING OF 18th DECEMBER 2002

    CERN Multimedia

    2003-01-01

    Outcome of the December Council Meetings Chairing the Management Board's final meeting of 2002 in the absence of the Director-General, the Director of Administration, J. van der Boon, summarised the decisions taken during the December Council week and the main follow-up actions needed in 2003. As reported by the Director-General in his talk to the staff the previous day, the Council had approved the Management's proposed activities and resources baseline plan covering LHC construction and financing in 2003-2010 and had responded favourably to the human resources plan for the same period. It had also approved the financial agreement for the loan from the European Investment Bank, which was due to be signed in Brussels the following day, and had adopted the proposals on the adjustment of salaries and pensions for 2003 (1.2% and 0.6% respectively), the granting of observer status to India, the creation of an Associate Status for Non-European States and the setting-up of an audit committee. Finally, the Council ...

  20. National Security Technology Incubation Project Continuation Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  1. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  2. World Radiopharmaceutical Therapy Council: A report on the 5th International Radiopharmaceutical Therapy Colloquium and the Final Planning Meeting of the World Radiopharmaceutical Therapy Council held at Santiago, Chile, 29 September, 2002

    International Nuclear Information System (INIS)

    Turner, J.V.

    2003-01-01

    -stenosis of coronary arteries following balloon angioplasty was presented by Achim Kropp of Dresden, Amalia Peix of Havana, and June-Key Chung from Seoul who also reported encouraging radiation synovectomy results. Hans Biersack described preliminary studies from Bonn with 188Re MAG3 RC-160 and 188Re-DOTATOC radiopeptides and the potential clinical applications of other 188Re radiopharmaceuticals for radiopeptide therapy and radioimmunotherapy were contemplated, given the daily on-site supply of radionuclide from the 188W/188Re generator. The Final Planning Meeting of the World Radiopharmaceutical Therapy Council, chaired by Harvey Turner, was held during the last session of the Colloquium and discussion was facilitated by a panel of members of the International Task Force of the Council comprising Horacio Amaral, Suresh Srivastava and Alan Perkins. A Preliminary Draft Charter of the World Radiopharmaceutical Therapy Council had been prepared by the Task Force with notable contributions from Sandy McEwan and Chaitanya Divgi and had been circulated to all attendees of the Foundation Planning Meeting of the Council held during the Annual Scientific Meeting of the Society of Nuclear Medicine, June 2001 in Toronto. This draft document was presented for detailed discussion at the Final Planning Meeting in Chile and embodied the principles of global cooperation in therapeutic nuclear medicine outlined in the first issue of the Journal. A Consensus Draft Charter subsequently prepared by the International Task Force was then submitted to the Assembly of Delegates of the World Federation of Nuclear Medicine and Biology on 1st October 2002. The proposal that the World Radiopharmaceutical Therapy Council become an affiliated body of the World Federation of Nuclear Medicine and Biology was adopted without dissent, having been proposed by the President, Horacio Amaral and supported by the Incoming President, Myung Chul Lee. The World Radiopharmaceutical Therapy Council will become an

  3. 77 FR 12579 - Notification of a Public Meeting of the Chartered Science Advisory Board

    Science.gov (United States)

    2012-03-01

    ... budget for EPA research and a draft report on science integration at EPA; to plan for a joint meeting of...). ADDRESSES: The meeting will be held at The Washington Plaza Hotel, 10 Thomas Circle NW., Washington, DC. FOR... Requested FY 2013 Research Budget for EPA The chartered SAB will conduct a quality review of an SAB draft...

  4. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  5. Strategic financial analysis: the CFO's role in strategic planning.

    Science.gov (United States)

    Litos, D M

    1985-03-01

    Strategic financial analysis, the financial information support system for the strategic planning process, provides information vital to maintaining a healthy bottom line. This article, the third in HCSM's series on the organizational components of strategic planning, reviews the role of the chief financial officer in determining which programs and services will best meet the future needs of the institution.

  6. 75 FR 20608 - Risk Communication Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2010-04-20

    ...] Risk Communication Advisory Committee; Notice of Meeting AGENCY: Food and Drug Administration, HHS... Communication Advisory Committee. General Function of the Committee: To provide advice and recommendations to... relevant to improving risk communication at FDA, and discuss applications or gaps for strategic planning of...

  7. 77 FR 68735 - New England Fishery Management Council; Public Meeting

    Science.gov (United States)

    2012-11-16

    ... Committee will continue to develop options and alternatives for Omnibus Essential Fish Habitat Amendment 2 (OA2). Specifically, the Committee will review Habitat Advisory Panel and Plan Development Team... England Fishery Management Council (Council) is scheduling a public meeting of its Habitat Oversight...

  8. Context, Rational, Scope and Objectives of the Meeting

    International Nuclear Information System (INIS)

    Monti, S.

    2013-01-01

    Scope and objectives of the technical meeting: • Presenting and exchanging information about existing and planned experimental facilities in support of the development of innovative fast neutron systems. • Facilitate the creation of a catalogue of existing and planned experimental facilities that are currently being operated or developed within national or international fast reactor programmes. • Identify experimental facilities which could provide experimental data in particular for V&V&Q of simulation tools for the design and the safety analysis of innovative fast neutron systems. • Discuss needs and propose new experimental activities to be carried out at international level

  9. Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface water

    International Nuclear Information System (INIS)

    1995-01-01

    National Pollutant Discharge Elimination System (NPDES) Permit TN0002968, issued April 28, 1995, requires that the Y-12 Plant Radiological Monitoring Plan for surface water be modified (Part 111-H). These modifications shall consist of expanding the plan to include storm water monitoring and an assessment of alpha, beta, and gamma emitters. In addition, a meeting was held with personnel from the Tennessee Department of Environment and Conservation (TDEC) on May 4, 1995. In this meeting, TDEC personnel provided guidance to Y-12 Plant personnel in regard to the contents of the modified plan. This report contains a revised plan incorporating the permit requirements and guidance provided by TDEC personnel. In addition, modifications were made to address future requirements of the new regulation for radiation protection of the public and the environment in regards to surface water monitoring

  10. Report to the Director General on the forty-fifth series of SAGSI meetings

    International Nuclear Information System (INIS)

    1997-11-01

    Mr. Graham Andrew chaired the 45th Series of SAGSI Meetings. Seventeen members of SAGSI attended the meeting, which was held in Vienna from 10 to 14 November 1997. The Secretariat was represented by Mr. R. Hooper, Director of the Division of Concepts and Planning, and other senior staff. SAGSI addressed the items on the agenda approved by the Director General, considered its work programme for the next period, and recommended an agenda for the next SAGSI meeting. This report to the Director General was prepared using drafting groups and was approved in plenary

  11. Strategic plan: Fiscal year 1997-Fiscal Year 2002

    International Nuclear Information System (INIS)

    1997-09-01

    The U.S. Nuclear Regulatory Commission (NRC) has established a clear strategic direction that will enable the NRC to carry out its mission and achieve the results expected by its primary customers, the collective interests of the American public. The Commission believes that this mission must be the foundation for making decisions about what activities the agency should perform. Thus, the Commission's programmatic decisions will not be fee-driven but will be based on their contributions to public health and safety. This strategic plan establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. Meeting these responsibilities requires the collective efforts of the NRC and its licensees, since the regulatory oversight of licensees is the responsibility of the NRC and the safe and secure use of nuclear materials for civilian purposes is the responsibility of NRC licensees. Finally, the development and implementation of the strategic plan will meet the requirements of the Government Performance and Results Act

  12. Supply chain planning classification

    Science.gov (United States)

    Hvolby, Hans-Henrik; Trienekens, Jacques; Bonde, Hans

    2001-10-01

    Industry experience a need to shift in focus from internal production planning towards planning in the supply network. In this respect customer oriented thinking becomes almost a common good amongst companies in the supply network. An increase in the use of information technology is needed to enable companies to better tune their production planning with customers and suppliers. Information technology opportunities and supply chain planning systems facilitate companies to monitor and control their supplier network. In spite if these developments, most links in today's supply chains make individual plans, because the real demand information is not available throughout the chain. The current systems and processes of the supply chains are not designed to meet the requirements now placed upon them. For long term relationships with suppliers and customers, an integrated decision-making process is needed in order to obtain a satisfactory result for all parties. Especially when customized production and short lead-time is in focus. An effective value chain makes inventory available and visible among the value chain members, minimizes response time and optimizes total inventory value held throughout the chain. In this paper a supply chain planning classification grid is presented based current manufacturing classifications and supply chain planning initiatives.

  13. 76 FR 62090 - Public Meeting for the National Park Service (NPS) Alaska Region's Subsistence Resource...

    Science.gov (United States)

    2011-10-06

    ...' Workshop. 12. New Business. a. Gates of the Arctic National Park SRC Draft Hunting Plan Recommendation 10... location are changed, a notice will be published in local newspapers and announced on local radio stations prior to the meeting date. SRC meeting locations and dates may need to be changed based on inclement...

  14. Community College Program Planning: A Method to Measure and Meet Community Need

    Science.gov (United States)

    Perez-Vergara, Kelly; Lathrop, Rachel; Orlowski, Martin

    2018-01-01

    Offering academic programs that meet community need has long been a core mission of community colleges. However, determining which job skills and credentials are needed for employment in the community is challenging. In order to facilitate a holistic and community-based perspective, our 2-year community college developed a structured curricular…

  15. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    International Nuclear Information System (INIS)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih; Abu-Zarour, Mohammad

    2010-01-01

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems.

  16. An investigation of the effect of changes of planning criteria on power system expansion planning with a case study of the Jordanian power system

    Energy Technology Data Exchange (ETDEWEB)

    Elkarmi, Fawwaz; Abu-Shikhah, Nazih [Al-Ahliyya Amman University, College of Engineering, AA University Post Office, Zip code 19328 (Jordan); Abu-Zarour, Mohammad [NEPCO, Department of Generation Planning, P.O. Box 2310, Amman 11194 (Jordan)

    2010-10-15

    Many factors contribute to the planning process of power systems. In the context of expansion planning, focus is paid to selection criteria that enable the optimization of related factors that will result in the best performance. This is described as meeting demand whilst reducing costs and maintaining minimal risk in operation. In this paper, different criteria used in the planning of power system expansion studies are investigated with the objective of identifying their impact on the expansion plan. The results of these criteria on the expansion study of the Jordanian power system are presented. Results show good correspondence to the actual adopted solutions. The spinning reserve is the most influential planning criterion on the overall system expansion cost. This is followed by the peak load changes, and the forced outage rate of the candidate units used for capacity additions to meet future expected demand. Finally, the loss of load expectation and cost of energy not served have the least effect on the overall system expansion cost. These results highlight the importance to be placed on performing sensitivity analyses to determine the most cost effective and acceptable expansion plan of the electric power system. There is a need to continually update the planning criteria to cater for changes and developments in the power system and the economic situation. Finally, the methodology of this study can be generalized to other power systems. (author)

  17. Energy Organizational Planning

    Energy Technology Data Exchange (ETDEWEB)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  18. Planning Curriculum in International Education.

    Science.gov (United States)

    Durtka, Sharon; Dye, Alex; Freund, Judy; Harris, Jay; Kline, Julie; LeBreck, Carol; Reimbold, Rebecca; Tabachnick, Robert; Tantala, Renee; Wagler, Mark

    International education begins at home, in the very communities and environments most familiar to students. A student does not need to travel outside U.S. borders to meet the peoples or understand the issues of the global village. This planning guide shows how curriculum in all subject areas encompasses global challenges, global cultures, and…

  19. 77 FR 68102 - Programs and Research Projects Affecting the Arctic; 99th Meeting

    Science.gov (United States)

    2012-11-15

    ...;and investigations, committee meetings, agency decisions and rulings, #0;delegations of authority... planning to attend who requires special accessibility features and/or auxiliary aids, such as sign language...

  20. The 1993 Canadian Association of Gastroenterology Strategic Plan: Excellence in Achievement

    Directory of Open Access Journals (Sweden)

    Richard Fedorak

    2003-01-01

    Full Text Available By the summer of 1990, the Canadian Association of Gastroenterology (CAG had been in existence as Canada’s premier gastroenterology society for nearly thirty years. The specialty of gastroenterology was in an exponential growth phase and many changes were on the horizon, including discussions as to whether the CAG should continue to conduct its annual meeting in conjunction with the Royal College meeting. In 1990, the CAG Governing Board and then president Dr Eldon Shaffer initiated a membership needs analysis (with technical assistance provided through the Strategic Planning Group at Searle Canada Inc to provide a foundation for a strategic planning process that was to carry forward over the next several years and ultimately produce the CAG’s first strategic planning document. After substantial review and assessment, the 1991/1992 and 1992/1993 CAG Governing Boards approved the 1993 CAG Strategic Plan. This strategic plan served the organization well over the past decade and has provided the cornerstone upon which the CAG advanced many progressive initiatives.

  1. How senior entomologists can be involved in the annual meeting: organization and the coming together of a large event

    Science.gov (United States)

    The Annual Meeting for the Entomological Society of America is a large event where planning is started at the end of the previous years’ meeting. The President of the Society named the Program Committee Co-Chairs for Entomology 2017 at the 2015 Annual Meeting, so that they could handle the duties o...

  2. European Climate Change Programme. Working Group II. Impacts and Adaptation. Urban Planning and Construction. Sectoral Report

    International Nuclear Information System (INIS)

    2007-03-01

    Adaptation is a new policy area for the European Climate Change Policy. The Impacts and Adaptation Workgroup has been set up as part of European Climate Change Programme (ECCP II). The main objective of the workgroup is to explore options to improve Europe's resilience to climate change impacts, to encourage the integration of climate change adaptation into other policy areas at the European, national, regional and local level and to define the role of EU-wide policies complementing action by Member States. The aim of this initial programme of work is to identify good practice in the development of adaptation policy and foster learning from different sectoral experiences and explore a possible EU role in adaptation policies. The Commission has led a series of 10 sectoral meetings looking at adaptation issues for different sectors. One of these meetings looked at the impacts on urban planning and infrastructure in particular. This report summarises the state of play in the urban planning sector in relation to adaptation to climate change on the basis of the information gathered at the stakeholder meeting. Some of the other stakeholder meetings, such as the meeting on human health, have a strong connection with the urban planning agenda. Therefore, some actions in the sector report on adaptation and human health relate to urban planning and infrastructure considerations

  3. 10 CFR 905.15 - What are the requirements for the small customer plan alternative?

    Science.gov (United States)

    2010-01-01

    ... alternative? 905.15 Section 905.15 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.15 What are the requirements for the small customer plan alternative? (a... all reasonable opportunities to meet future energy service requirements using demand-side management...

  4. Technical minutes of the ninth INDC meeting. Vienna, 16-20 May 1977

    International Nuclear Information System (INIS)

    Motz, H.

    1978-05-01

    Progress reports from data centres on data measurements, facilities and evaluations, on coordinating activities are presented along with reports of technical, ad-hoc and policy subcommittees, on plans for cooperation and past meetings

  5. 78 FR 57841 - Western Pacific Fishery Management Council; Public Meetings

    Science.gov (United States)

    2013-09-20

    ... Marine Mammal Stock Assessment Reports F. False Killer Whale Take Reduction Plan Research Priorities G.... Insular Fisheries A. Report on the Main Hawaiian Islands (MHI) Bottomfish Research Working Group Outcomes.... Pacific Island Fisheries Research Program E. Report on the Fisheries Data Clients Meeting F. SSC...

  6. 75 FR 62507 - New England Fishery Management Council; Public Meeting

    Science.gov (United States)

    2010-10-12

    ... jointly with the Habitat Plan Development Team to discuss management alternatives related to minimizing the adverse effects of fishing on Essential Fish Habitat (EFH), which are being developed for the... England Fishery Management Council (Council) is scheduling a public meeting of its Habitat/MPA/Ecosystem...

  7. Health Plans Can't Ignore The Customer Experience Any Longer.

    Science.gov (United States)

    Swanson, Erik

    2017-10-01

    With regulations limiting differentiation between products, health plans must rethink consumer experience to meet expectations of today's consumers, who seek convenience, quality, and speed from their health care organizations. Many plans understand they need to connect more effectively with their end customers, but technological, cultural, and other obstacles are in the way.

  8. Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

    Energy Technology Data Exchange (ETDEWEB)

    Ling, Lawrence T. [URS-Savannah River Remediation, Savannah River Site, Building 766-H Room 2205, Aiken, SC 29808 (United States); Chew, David P. [URS-Savannah River Remediation, Savannah River Site, Building 766-H Room 2426, Aiken, SC 29808 (United States)

    2013-07-01

    The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance

  9. Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

    International Nuclear Information System (INIS)

    Ling, Lawrence T.; Chew, David P.

    2013-01-01

    The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance

  10. Nuclear power reactor security personnel training and qualification plan reviewer workbook

    International Nuclear Information System (INIS)

    1979-06-01

    The Training and Qualification Plan Reviewer Workbook has been developed to provide the information required for evaluating the adequacy of the Training and Qualification (T and Q) Plans developed to meet the requirements of 10 CFR 73.55(b)(4) and 10 CFR 73, Appendix B

  11. 78 FR 42799 - Glen Canyon Dam Adaptive Management Work Group Meetings

    Science.gov (United States)

    2013-07-17

    ... 8:00 a.m. to approximately 1:30 p.m. ADDRESSES: The meeting will be held at the Little America Hotel... Year 2013-14 Budget and Work Plan, and to approve the Water Year 2014 Hydrograph operation for Glen...

  12. Netherlands in the spotlight at the ENLIGHT meeting on particle therapy

    CERN Multimedia

    Virginia Greco (CERN) and Manjit Dosanjh (ENLIGHT co-coordinator)

    2016-01-01

    The annual meeting of ENLIGHT, which focuses on particle therapy for cancer treatment, was held in the Netherlands.   Participants of the annual meeting of ENLIGHT, held in the Netherlands from 15-17 September 2016. The annual meeting of ENLIGHT (European Network for Light Hadron Therapy), which gathers experts working worldwide in centres and research institutions for particle therapy for cancer treatment, was hosted this year by the Dutch National Institute for Subatomic Physics (Nikhef) and the University of Utrecht, in the Netherlands, from 15-17 September. Chaired by the co-coordinator of ENLIGHT, Manjit Dosanjh, and the local organisers, Els Koffeman and Jan Visser from Nikhef, the meeting was attended by almost 100 participants from 15 countries. The Netherlands took centre stage at the ENLIGHT meeting: four brand new centres for proton therapy in the Netherlands are currently at various phases of completion as a consequence of the recent approval by the Dutch government of a plan for mak...

  13. Implementation and acceptability of strategies instituted for engaging men in family planning services in Kibaha district, Tanzania.

    Science.gov (United States)

    Msovela, Judith; Tengia-Kessy, Anna

    2016-11-21

    Men as the main decision makers in most of African families have an important role to play towards acceptance of family planning methods. This study sought to identify strategies used to engage men in family planning services and determine the extent to which men in Kibaha district in Tanzania accept these interventions. We conducted a cross sectional study using both quantitative and qualitative techniques. We used a questionnaire to interview a random sample of 365 of currently married or cohabiting men who had at least one child under the age of five years. We further conducted in-depth interviews with health workers involved in delivering reproductive health services as well as community dispensers of family planning commodities. Descriptive analysis was used to determine the extent to which men were engaged in family planning services. The data from the indepth interviews were analysed manually according to the predetermined themes, guided by the grounded theory to identify the existing strategies used to encourage male involvement in family planning services. According to the key informants, strategies that are used to encourage men to engage in family planning services include invitations through their spouses, either verbally or by using partner notification cards, incorporating family planning messages during monthly meetings and community outreach reproductive health programs. Of 365 men responding to the questionnaire, only 31 (8.4%) said they were invited to accompany their spouses to family planning clinics. Among them, 71% (22/31) visited family planning clinics. A third (32%) of the respondents had heard of community health meetings and only 20.7% of them attended these meetings. More than a third (12/34) of men who attended these meeting asserted that family planning messages targeting men featured in the agenda and subsequently half of them visited health facilities for family planning services. Existing strategies such as invitations to clinics

  14. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  15. Planning an innovation marathon at an infectious disease conference with results from the International Meeting on Emerging Diseases and Surveillance 2016 Hackathon

    Directory of Open Access Journals (Sweden)

    John W. Ramatowski

    2017-12-01

    Full Text Available A hackathon is best described as an ‘innovation marathon’. Derived from the words ‘hacking’ and ‘marathon’, it brings together multidisciplinary teams to collaborate intensely over a short period of time to define a problem, devise a solution, and design a working prototype. International scientific meetings are conducive to successful hackathons, providing an audience of expert professionals who describe challenges and ensure the proposed solutions address end-user needs. Collaborations with local organizations and academic centers are crucial to attracting complementary specialties such as IT advisors, engineers, and entrepreneurs to develop sustainable projects. The core process of first identifying and deconstructing a problem followed by solution iteration is applicable to challenges at workplaces around the world. Ultimately, this model can be used to drive innovation and catalyze change in the global health community. The planning, execution, and outcomes of a hackathon event organized in conjunction with the International Meeting on Emerging Diseases and Surveillance (IMED 2016 are described in this article. Physicians, public health practitioners, veterinarians, IT professionals, engineers, and entrepreneurs came together for 2 days to develop solutions at the intersection of emerging infectious diseases and climate change. Projects that resulted from the IMED 2016 Hackathon included environmental impact assessment software for humanitarian organization relief efforts; enhanced communication tools to prevent disease outbreaks; a participatory mobile application to speed the elimination of rabies in Indonesia; integrated disease surveillance platforms; and an improved search function for infectious disease outbreak reports in the ProMED-mail network. Keywords: Hackathon, Innovation, Infectious diseases, Public health, Medical meeting, Interdisciplinary, Emerging infectious diseases

  16. Africa: the new family planning frontier.

    Science.gov (United States)

    Caldwell, John C; Caldwell, Pat

    2002-03-01

    Sub-Saharan Africa will be the family planning frontier of the twenty-first century. Fertility levels and population growth rates are still high, and family planning programs suited to the region are still being developed. Nevertheless, by the end of the twentieth century, fertility transition was under way in Southern Africa and a few countries elsewhere. Successful regional family planning in the twenty-first century will depend upon stronger political leadership, the development of family planning programs that meet the needs of all segments of society and not only currently married women, assistance to the market, and a recognition of the central importance of hormonal methods, especially injectables. Problems include stagnation in economic growth and in child mortality decline, as well as the persistence of the AIDS epidemic.

  17. Multicentre quality assurance of intensity-modulated radiation therapy plans: a precursor to clinical trials

    International Nuclear Information System (INIS)

    Williams, M. J.; Bailey, M. J.; Forstner, D.; Metcalfe, P. E

    2007-01-01

    Full text: A multicentre planning study comparing intensity-modulated radiation therapy (IMRT) plans for the treatment of a head and neck cancer has been carried out. Three Australian radiotherapy centres, each with a different planning system, were supplied a fully contoured CT dataset and requested to generate an IMRT plan in accordance with the requirements of an IMRT-based radiation therapy oncology group clinical trial. Plan analysis was carried out using software developed specifically for reviewing multicentre clinical trial data. Two out of the three plans failed to meet the prescription requirements with one misinterpreting the prescription and the third failed to meet one of the constraints. Only one plan achieved all of the dose objectives for the critical structures and normal tissues. Although each centre used very similar planning parameters and beam arrangements the resulting plans were quite different. The subjective interpretation and application of the prescription and planning objectives emphasize one of the many difficulties in carrying out multicentre IMRT planning studies. The treatment prescription protocol in a clinical trial must be both lucid and unequivocally stated to avoid misinterpretation. Australian radiotherapy centres must show that they can produce a quality IMRT plan and that they can adhere to protocols for IMRT planning before using it in a clinical trial

  18. Organisational Problems in Planning Educational Development.

    Science.gov (United States)

    Organisation for Economic Cooperation and Development, Paris (France). Directorate for Scientific Affairs.

    Papers submitted to a meeting of economists, educators, and government officials discuss the organizational implications of the link between education and economic growth. Following an introduction by Henning Friis, the authors and titles of the papers are (1) Necat Erder, "Some Administrative Problems in Educational Planning," (2) Raymond…

  19. Factor 4 planning

    International Nuclear Information System (INIS)

    Bariol-Mathais, Brigitte; Lavoillotte, Philippine; Gall-Sorrentino, Florence; Malez, Marianne; Sanna, Daniela; Marsauche, Maud; Marquet, Sarah; Debergue, Sophie; Aminu, Olufunmi; Bernard, Helene; Marchand, Jean-Michel; Blin, Frederic; Grange, Jerome; Caillierez, Sophie; Muller, Dania; Clement, Bob; Desire, Jean-Charles; Metais, Benedicte; Lannuzel, Philippe; Pezet-Kuhn, Murielle; Pons, Anne; Rivoire-Meley, Benedicte; Tissot, Heloise

    2015-07-01

    Factor 4 is the goal of cutting our greenhouse gas emissions by 75% by 2050. Achieving this objective will necessitate radical changes in our practices, in particular concerning transport and housing; the measures currently implemented, such as positive-energy buildings, low-impact mobility and eco-neighbourhoods, will not be enough to meet this goal. These measures must be conceived in the framework of broad territorial planning that integrates environmental and energy objectives far upstream. To this end, the French Environment and Energy Management Agency (ADEME) and the French network of Urban Planning Agencies (FNAU), pursuing their missions in their respective areas of competence, have joined forces to make infrastructure and land use planning an integral part of the environmental and energy transition process. In 2013, the two organisations signed a partnership agreement and compiled an inventory of practices that are relevant to Factor 4 planning. This work was led by Epures, Saint-etienne urban planning agency, along with FNAU, drawing upon the expertise of a dozen urban planning agencies in precursor territories. This inventory describes the stakes, resources and strengths for each territory, which have led to cross-sectoral territorial planning exercises with ambitious environmental and energy objectives; the importance of evaluation in attaining these goals is emphasised. Current experience, questions and available methodological tools are summarised in this document, to encourage territories and help them design their planning policies along a trajectory to achieve Factor 4 goals. The compilation also aims to be a contribution to the COP21 climate conference

  20. 76 FR 70483 - Environmental Impact Statement and General Management Plan, Paterson Great Falls National...

    Science.gov (United States)

    2011-11-14

    ... planning process and will remain actively involved throughout the development of the plan. Prepared by... the long-term management of Paterson Great Falls NHP early in the process through public meetings and... Impact Statement and General Management Plan, Paterson Great Falls National Historical Park, NJ AGENCY...

  1. 75 FR 61779 - National Science Board: Sunshine Act Meetings; Notice

    Science.gov (United States)

    2010-10-06

    ... Science Board's Committee on Programs and Plans, pursuant to NSF regulations (45 CFR Part 614), the... National Science Board business and other matters specified, as follows: DATE AND TIME: October 13, 2010, 1... Performance Computing Award. STATUS: Closed. LOCATION: This meeting will be held at National Science...

  2. 78 FR 13688 - National Advisory Committee on Rural Health and Human Services; Notice of Meeting

    Science.gov (United States)

    2013-02-28

    .... April 5, 2013, 8:45 a.m.-11:15 a.m. Place: Hospice & Palliative Care of Western Colorado, 3090 North... findings from the meeting and develop a work plan for the next quarter and the following meeting. The... Nash at the Office of Rural Health Policy (ORHP) via telephone at (301) 443-0835 or by email at nnash...

  3. An Automated Planning Model for RoF Heterogeneous Wireless Networks

    DEFF Research Database (Denmark)

    Shawky, Ahmed; Bergheim, Hans; Ragnarsson, Ólafur

    2010-01-01

    The number of users in wireless WANs is increasing like never before, at the same time as the bandwidth demands by users increase.The structure of the third generation Wireless WANs makes it expensive for Wireless ISPs to meet these demands.The FUTON architecture is a RoF heterogeneous wireless...... network architecture under development,that will be cheaper to deploy and operate.This paper shows a method to plan an implementation of this architecture.The planning is done as automatic as possible,covering radio planning, fiber planning and network dimensioning. The out come of the paper is a planning...

  4. LLW Forum meeting report, October 20--22, 1997

    International Nuclear Information System (INIS)

    Norris, C.; Brown, H.; Lovinger, T.; Scheele, L.; Shaker, M.A.

    1997-10-01

    The Low-Level Radioactive Waste Forum met in Annapolis, Maryland, on October 20--22, 1997. Twenty-six Forum Participants, Alternate Forum Participants, and meeting designees representing 22 compacts and states participated. A report on the meeting is given under the following subtitles: New developments in states and compacts; Discussion with NRC Commissioner McGaffigan; Regulatory issues session; Executive session; LLW forum business session; DOE low-level waste management program; Transportation of radioactive waste; Environmental equity: Title VI; Congressional studies on Ward Valley Site; Implementation of DOE's strategy for waste management; Relicensing Envirocare; Draft agreement for uniform application of manifesting procedures; CRCPD report; Panel: Future of low-level radioactive waste management; Agenda planning: February 1998; Resolutions; and Attendance

  5. Electricity market readiness plan : Ontario Energy Board

    International Nuclear Information System (INIS)

    2001-03-01

    This document informs electric power market participants of the Ontario Energy Board's newly developed market readiness plan and target timelines that local distribution companies (LDCs) must meet for retail marketing. The Ontario Energy Board's plan incorporates relevant independent market operator (IMO)-administered market milestones with retail market readiness targeted for September 2001. The market readiness framework involves a self-certification process for LDCs by August 10, 2001, through which the Board will be able to monitor progress and assess the feasibility of meeting the target timelines. For retail market readiness, all LDCs will have to calculate settlement costs, produce unbundled bills, provide standard supply service, change suppliers and accommodate retail transactions. LDCs must be either authorized participants in the IMO-administered market or become retail customers of their host LDC. Unbundled bills will include itemized charges for energy price, transmission, distribution and debt retirement charge. 1 tab., 1 fig

  6. Hierarchical Planning Methodology for a Supply Chain Management

    Directory of Open Access Journals (Sweden)

    Virna ORTIZ-ARAYA

    2012-01-01

    Full Text Available Hierarchical production planning is a widely utilized methodology for real world capacitated production planning systems with the aim of establishing different decision–making levels of the planning issues on the time horizon considered. This paper presents a hierarchical approach proposed to a company that produces reusable shopping bags in Chile and Perú, to determine the optimal allocation of resources at the tactical level as well as over the most immediate planning horizon to meet customer demands for the next weeks. Starting from an aggregated production planning model, the aggregated decisions are disaggregated into refined decisions in two levels, using a couple of optimization models that impose appropriate constraints to keep coherence of the plan on the production system. The main features of the hierarchical solution approach are presented.

  7. Temperature uniformity mapping in a high pressure high temperature reactor using a temperature sensitive indicator

    NARCIS (Netherlands)

    Grauwet, T.; Plancken, van der I.; Vervoort, L.; Matser, A.M.; Hendrickx, M.; Loey, van A.

    2011-01-01

    Recently, the first prototype ovomucoid-based pressure–temperature–time indicator (pTTI) for high pressure high temperature (HPHT) processing was described. However, for temperature uniformity mapping of high pressure (HP) vessels under HPHT sterilization conditions, this prototype needs to be

  8. Meeting health and family planning needs in Latin America and the Caribbean.

    Science.gov (United States)

    1995-06-01

    The operations research and technical assistance (OR/TA) project in The Population Council has concentrated on fertility and infant mortality issues in Latin American and the Caribbean for more than a decade through INOPAL. INOPAL is an acronym for Investigacion Operacional en Planificacion Familiar y Atencion Materno-Infantil para America Latina y el Caribe (Operations Research in Family Planning and Maternal-Child Health in Latin America and the Caribbean). In March 1995, the project entered its third phase, INOPAL III, with the renewal of its contract from the United States Agency for International Development (USAID). To facilitate communication between INOPAL, collaborating agencies, and USAID, INOPAL Director James Foreit moved from Peru to a Council office in Washington, D.C. INOPAL has six objectives: 1) to test the integration of family planning and reproductive health services; 2) to increase access to family planning; 3) to develop strategies to reach special populations; 4) to improve the sustainability of family planning programs; 5) to improve service quality; and 6) to institutionalize operations research capability in the region. INOPAL II conducted 61 subprojects in 12 countries in collaboration with 24 USAID cooperating agencies and other international organizations. The project established new services for postpartum women, adolescents, and rural women; improved program quality and financial sustainability; increased vasectomy promotion and the range of available contraceptives; and developed new modes of service delivery. A key finding of INOPAL II operations research was the importance of increasing cost-effectiveness to ensure program sustainability. INOPAL III will work toward all six objectives, with an emphasis on integrating reproductive health and family planning services. Operations research and technical assistance (OR/TA) subprojects will focus on the prevention and treatment of sexually transmitted diseases, perinatal and postpartum

  9. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1994-11-01

    The purpose of this plan is to establish the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program and outline the activities and schedules that will be employed to reduce the quantity and toxicity of wastes generated as a result of restoration and remediation activities. It is intended to satisfy the US Department of Energy (DOE) and other legal requirements. As such, the Pollution Prevention Awareness program required by DOE Order 5400.1 is included with the Pollution Prevention Program. This plan is also intended to aid projects in meeting and documenting compliance with the various requirements for WMin/P2, and contains the policy, objectives, strategy, and support activities of the WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Various pollution prevention techniques will be implemented with the support of employee training and awareness programs to reduce waste and still meet applicable requirements. Information about the Hanford Site is in the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan

  10. 77 FR 58210 - 31st Meeting: RTCA Special Committee 206, Aeronautical Information and Meteorological Data Link...

    Science.gov (United States)

    2012-09-19

    ... approve meeting agenda Action item review Sub-Group (SG1--Wake OSED, SG3--Architecture, SG4--DO-252... Architecture(s) AAtS Implementation Guidance Document New Capabilities in Flight Services 1 p.m. Opening... Action item review Future meeting plans and dates Other business 1 p.m. Adjourn (no lunch break) Welcome...

  11. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    Science.gov (United States)

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  12. Sixteenth Meeting of the IMS Study Group "Cantus Planus"

    Czech Academy of Sciences Publication Activity Database

    Vozková, Jana

    2011-01-01

    Roč. 48, 2-3 (2011), s. 310-311 ISSN 0018-7003. [Sixteenth Meeting of the IMS Study Group “Cantus Planus”. Vídeň, 21.08.2011–27.08.2011] Institutional research plan: CEZ:AV0Z90580513 Keywords : plainchant * annual conference * International Musicological Society Subject RIV: AL - Art, Architecture, Cultural Heritage

  13. Planning a regional palliative care services network.

    Science.gov (United States)

    Zalot, G N

    1989-03-01

    Table 1 summarizes the role of task force members and staff for each of the main tasks of the process of planning. The number of meetings required for each stage of the process is estimated in the last column. Planning for a regional palliative care services network is a process involving "hard" and "soft" elements. Hard elements involve the organizational structure, task force meetings, information/statistical data bases and the discrete tasks summarized in Table 1. These elements are well known, if nokt always well organized in practice. It is the "softer" elements that usually mean the difference between a dull bureaucratic exercise and a creative exchange of ideas and concepts with a vision for the future. Not to be underestimated is the critical role of group development in this process. The Task Force, supported by professional staff expertise and judgment, hopes to achieve a level of group development termed "synergy," that is, where the group outperforms (in terms of quality and quantity of work) its best individual member. Not a small feat, but critical to a successful planning exercise! Any regional planning implies a commitment to change. After all, new services will be added, some phased out, others revised, and others enhanced, resulting in changes in roles and responsibilities of providers. Change should not be greeted with disdain but viewed as a natural part of the environment in which we plan and provide services. A major advantage to the process of planning is that the level of support for change is already mobilized through the various stages of the process highlighted.(ABSTRACT TRUNCATED AT 250 WORDS)

  14. CSNI specialist meeting on simulators and plant analyzers

    International Nuclear Information System (INIS)

    Miettinen, J.; Holmstroem, H.

    1994-01-01

    The Specialist Meeting on Simulators and Plant Analyzers, held in June 9-12, 1992, in Lappeenranta, Finland, was sponsored by the Committee on the Safety on Nuclear Installations (CSNI) of the OECD Nuclear Energy Agency (NEA). It was organized in collaboration with the Technical Research Centre of Finland (VTT) and the Lappeenranta Technical University of Technology (LTKK). All the presented papers were invited and devided into four sessions. In the first session the objectives, requirements and consepts of simulators were discussed against present standards and guidelines. The second session focused on the capabilities of current analytical models. The third session focused on the experiences gained so far from the applications. The final fourth session concentrated on simulators, which are currently under development, and future plans with regard to both development and utilization. At the end of the meeting topics of the meeting were discussed at the panel discussion. Summaries of the sessions and shortened version of the panel discussion are included into the proceeding. (orig.)

  15. 76 FR 72220 - Board of Directors Audit Committee Meeting; Sunshine Act

    Science.gov (United States)

    2011-11-22

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Board of Directors Audit Committee Meeting; Sunshine Act... Director III. Executive Session Related to Pending Litigation IV. Internal Audit Report with Management's Response V. FY '12 Risk Assessment and Internal Audit Plan VI. FY '12 EHLP Risk Assessment and Internal...

  16. 76 FR 30244 - Veterans' Rural Health Advisory Committee; Notice of Meeting

    Science.gov (United States)

    2011-05-24

    ... on health care issues affecting enrolled Veterans residing in rural areas. The Committee examines... Rural Health Strategic Plan discussion and work session and the other is the Committee's annual report... DEPARTMENT OF VETERANS AFFAIRS Veterans' Rural Health Advisory Committee; Notice of Meeting The...

  17. 76 FR 78672 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2011-12-19

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  18. 75 FR 13136 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2010-03-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App.), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  19. 78 FR 36555 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2013-06-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  20. 77 FR 72364 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2012-12-05

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  1. 78 FR 76848 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App.), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  2. 75 FR 42101 - National Library of Medicine; Notice of Meeting

    Science.gov (United States)

    2010-07-20

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  3. 76 FR 45842 - National Library of Medicine Notice of Meetings

    Science.gov (United States)

    2011-08-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  4. 75 FR 78718 - National Library of Medicine; Notice of Meeting

    Science.gov (United States)

    2010-12-16

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  5. 77 FR 17490 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2012-03-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  6. 77 FR 39715 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2012-07-05

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  7. 76 FR 14677 - National Library of Medicine; Notice of Meeting

    Science.gov (United States)

    2011-03-17

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  8. 78 FR 18356 - National Library of Medicine; Notice of Meetings

    Science.gov (United States)

    2013-03-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Library of Medicine.... App), notice is hereby given of meetings of the Board of Regents of the National Library of Medicine.... Individuals who plan to attend and need special assistance, such as sign language interpretation or other...

  9. 76 FR 3180 - National Science Board; Sunshine Act Meetings; Notice

    Science.gov (United States)

    2011-01-19

    ... NATIONAL SCIENCE FOUNDATION National Science Board; Sunshine Act Meetings; Notice The National Science Board's Committee on Programs and Plans and the Committee on Audit & Oversight, pursuant to NSF regulations (45 CFR part 614), the National Science Foundation Act, as amended (42 U.S.C. 1862n-5), and the...

  10. 76 FR 58049 - Special Board of Directors Meeting: Sunshine Act

    Science.gov (United States)

    2011-09-19

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Special Board of Directors Meeting: Sunshine Act TIME AND DATE: 2 p.m., Thursday, July 21, 2011. PLACE: 1325 G Street, NW., Suite 800, Boardroom, Washington, DC..., (202) 220-2376; [email protected] . AGENDA: I. Call to Order II. Theory of Change III. Strategic Plan, July...

  11. Transuranic Waste Characterization Quality Assurance Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  12. Transuranic Waste Characterization Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    1995-01-01

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes

  13. Social Media Marketing Plan for Lakeside Cafe

    OpenAIRE

    Saari, Mona

    2017-01-01

    The principles of marketing have always been about connecting with consumers at the right place at the right time. Nowadays that means meeting them where they are spending a lot of their time already: online. Engaging with brands has become a part of the buyer decision process. Social media effects consumers’ decisions to purchase more than ever before. This thesis aimed to create a social media marketing plan for a Finnish tourism company called Lakeside Cafe. The plan was based on the SOSTA...

  14. STANDING CONCERTATION COMMITTEE ORDINARY MEETING ON 24 JANUARY 2001

    CERN Multimedia

    2001-01-01

    This meeting was mainly devoted to follow-up from the meetings of the Finance Committee and Council in December 2000, as well as to the work planning of the SCC for 2001. The newly-appointed Chairman of SCC, J. van der Boon, welcomed the Director-General and members to this first meeting of the new year, underlining his objective of maintaining a positive climate of concertation in the best interests of the Organization and its personnel. The President of the Staff Association declared that the latter would actively pursue its role in the same spirit. 1. Follow-up from the meetings of the Finance Committee and Council in December 2000 The Director-General, underlining the positive outcome of the 5-yearly review, conveyed his thanks to all parties that had taken part and, in particular, to the Staff Association for its constructive contribution to reach the compromise accepted by the three parties. After discussion of decisions on the package of measures approved by Council last December and on related impleme...

  15. Proceedings of the first users meeting for the Advanced Photon Source

    Energy Technology Data Exchange (ETDEWEB)

    1988-02-01

    The first national users meeting for the Advanced Photon Source (APS) at Argonne National Laboratory - held November 13-14, 1986, at Argonne - brought together scientists and engineers from industry, universities, and national laboratories to exchange information on the design of the facility and expectations for its use. Presented papers and potential participating research team (PRT) plans are documented in these proceedings. Topics covered include the current status of the project, an overview of the APS conceptual design, scientific opportunities offered by the facility for synchrotron-radiation-related research, current proposals and funding mechanisms for beam lines, and user policies. A number of participants representing universities and private industry discussed plans for the possible formation of PRTs to build and use beam lines at the APS site. The meeting also provided an opportunity for potential users to organize their efforts to support and guide the facility's development.

  16. Proceedings of the first users meeting for the Advanced Photon Source

    International Nuclear Information System (INIS)

    1988-02-01

    The first national users meeting for the Advanced Photon Source (APS) at Argonne National Laboratory - held November 13-14, 1986, at Argonne - brought together scientists and engineers from industry, universities, and national laboratories to exchange information on the design of the facility and expectations for its use. Presented papers and potential participating research team (PRT) plans are documented in these proceedings. Topics covered include the current status of the project, an overview of the APS conceptual design, scientific opportunities offered by the facility for synchrotron-radiation-related research, current proposals and funding mechanisms for beam lines, and user policies. A number of participants representing universities and private industry discussed plans for the possible formation of PRTs to build and use beam lines at the APS site. The meeting also provided an opportunity for potential users to organize their efforts to support and guide the facility's development

  17. The Physical Therapy and Society Summit (PASS) Meeting: observations and opportunities.

    Science.gov (United States)

    Kigin, Colleen M; Rodgers, Mary M; Wolf, Steven L

    2010-11-01

    The construct of delivering high-quality and cost-effective health care is in flux, and the profession must strategically plan how to meet the needs of society. In 2006, the House of Delegates of the American Physical Therapy Association passed a motion to convene a summit on "how physical therapists can meet current, evolving, and future societal health care needs." The Physical Therapy and Society Summit (PASS) meeting on February 27-28, 2009, in Leesburg, Virginia, sent a clear message that for physical therapists to be effective and thrive in the health care environment of the future, a paradigm shift is required. During the PASS meeting, participants reframed our traditional focus on the physical therapist and the patient/client (consumer) to one in which physical therapists are an integral part of a collaborative, multidisciplinary health care team with the health care consumer as its focus. The PASS Steering Committee recognized that some of the opportunities that surfaced during the PASS meeting may be disruptive or may not be within the profession's present strategic or tactical plans. Thus, adopting a framework that helps to establish the need for change that is provocative and potentially disruptive to our present care delivery, yet prioritizes opportunities, is a critical and essential step. Each of us in the physical therapy profession must take on post-PASS roles and responsibilities to accomplish the systemic change that is so intimately intertwined with our destiny. This article offers a perspective of the dynamic dialogue and suggestions that emerged from the PASS event, providing further opportunities for discussion and action within our profession.

  18. 39 CFR 6.1 - Regular meetings, annual meeting.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Regular meetings, annual meeting. 6.1 Section 6.1 Postal Service UNITED STATES POSTAL SERVICE THE BOARD OF GOVERNORS OF THE U.S. POSTAL SERVICE MEETINGS (ARTICLE VI) § 6.1 Regular meetings, annual meeting. The Board shall meet regularly on a schedule...

  19. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  20. SU-E-T-97: An Analysis of Knowledge Based Planning for Stereotactic Body Radiation Therapy of the Spine

    International Nuclear Information System (INIS)

    Foy, J; Marsh, R; Owen, D; Matuszak, M

    2015-01-01

    Purpose: Creating high quality SBRT treatment plans for the spine is often tedious and time consuming. In addition, the quality of treatment plans can vary greatly between treatment facilities due to inconsistencies in planning methods. This study investigates the performance of knowledge-based planning (KBP) for spine SBRT. Methods: Treatment plans were created for 28 spine SBRT patients. Each case was planned to meet strict dose objectives and guidelines. After physician and physicist approval, the plans were added to a custom model in a KBP system (RapidPlan, Varian Eclipse v13.5). The model was then trained to be able to predict estimated DVHs and provide starting objective functions for future patients based on both generated and manual objectives. To validate the model, ten additional spine SBRT cases were planned manually as well as using the model objectives. Plans were compared based on planning time and quality (ability to meet the plan objectives, including dose metrics and conformity). Results: The average dose to the spinal cord and the cord PRV differed between the validation and control plans by <0.25% demonstrating iso-toxicity. Six out of 10 validation plans met all dose objectives without the need for modifications, and overall, target dose coverage was increased by about 4.8%. If the validation plans did not meet the dose requirements initially, only 1–2 iterations of modifying the planning parameters were required before an acceptable plan was achieved. While manually created plans usually required 30 minutes to 3 hours to create, KBP can be used to create similar quality plans in 15–20 minutes. Conclusion: KBP for spinal tumors has shown to greatly decrease the amount of time required to achieve high quality treatment plans with minimal human intervention and could feasibly be used to standardize plan quality between institutions. Supported by Varian Medical Systems

  1. Design an effective storm water pollution prevention plan

    International Nuclear Information System (INIS)

    Vivona, M.A.

    1995-01-01

    A case history shows ''how'' to plan and organize a storm water pollution prevention program (SWPPP). Using easy-to-use worksheets and guidelines, hydrocarbon processing industry (HPI) operators can build upon existing best management practices (i.e., housekeeping procedures, visual inspections, spill prevention programs, etc.) to meet tighter restrictions set by National Pollutant Discharge Elimination system (NPDES) permits. Especially in high rainfall areas, storm water poses an intermittent, but large volume problem. The facility's site size is another factor that impacts the scope and cost for SWPPP. The five steps to implementing a SWPPP are: Planning and organization; Assessment; Best management practice (BMP) identification; Implementation; Evaluation and monitoring. Initially, HPI operators must identify all potential contamination sources and past spills and leak areas. Following the SWPP guidelines, operators can map out a cost-effective storm water program that meets all NPDES requirements

  2. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  3. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Erhart, Steven C. [National Nuclear Security Administration (NNSA), Washington, DC (United States); Spencer, Charles G. [Y-12 National Security Complex, Oak Ridge, TN (United States)

    2013-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  4. Hanford Waste Vitrification Plant Technology Plan

    International Nuclear Information System (INIS)

    Sexton, R.A.

    1988-06-01

    The reference Hanford plan for disposal of defense high-level waste is based on waste immobilization in glass by the vitrification process and temporary vitrified waste storage at the Hanford Site until final disposal in a geologic repository. A companion document to the Hanford Waste Management Plan (HWMP) is the Draft, Interim Hanford Waste Management Technology Plan (HWMTP), which provides a description of the technology that must be developed to meet the reference waste management plan. One of the issues in the HWMTP is DST-6, Immobilization (Glass). The HWMTP includes all expense funding needed to complete the Hanford Waste Vitrification Plant (HWVP) project. A preliminary HWVP Technology Plan was prepared in 1985 as a supporting document to the HWMTP to provide a more detailed description of the technology needed to construct and operate a vitrification facility. The plan was updated and issued in 1986, and revised in 1987. This document is an annual update of the plan. The HWVP Technology Plan is limited in scope to technology that requires development or confirmation testing. Other expense-funded activities are not included. The relationship between the HWVP Technology Plan and other waste management issues addressed in the HWMTP is described in section 1.6 of this plan. 6 refs., 4 figs., 34 tabs

  5. Cross-cultural communication and use of the family meeting in palliative care.

    Science.gov (United States)

    Sharma, Rashmi K; Dy, Sydney M

    2011-09-01

    Terminally-ill patients and their families often report poor communication and limited understanding of the patient's diagnosis, prognosis, and treatment plan; these deficits can be exacerbated by cross-cultural issues. Although family meetings are frequently recommended to facilitate provider-family communication, a more structured, evidence-based approach to their use may improve outcomes. Drawing on research and guidelines from critical care, palliative care, and cross-cultural communication, we propose a framework for conducting family meetings with consideration for cross-cultural issues.

  6. Proceedings of the IEA Working Group meeting on ferritic/martensitic steels

    International Nuclear Information System (INIS)

    Klueh, R.L.

    1996-01-01

    An IEA working group on ferritic/martensitic steels for fusion applications, consisting of researchers from Japan, European Union, USA, and Switzerland, met at the headquarters of the Joint European Torus, Culham, UK. At the meeting, preliminary data generated on the large heats of steels purchased for the IEA program and on other heats of steels were presented and discussed. Second purpose of the meeting was to continue planning and coordinating the collaborative test program in progress on reduced-activation ferritic/martensitic steels. The majority of this report consists of viewographs for the presentations

  7. Youth Exercise Intention and Past Exercise Behavior: Examining the Moderating Influences of Sex and Meeting Exercise Recommendations

    Science.gov (United States)

    Downs, Danielle Symons; Graham, George M.; Yang, Stephen; Bargainnier, Sandra; Vasil, Jay

    2006-01-01

    The study purposes were to examine: (a) the determinants of exercise intention and past exercise behavior (PEB) using the theories of reasoned action and planned behavior, and (b) the moderating influences of sex and exercise group (meeting or not meeting exercise guidelines). Participants (n = 676 adolescents) completed self-reported measures of…

  8. Linking pre-meeting communication to meeting effectiveness

    NARCIS (Netherlands)

    Allen, J.A.; Lehmann-Willenbrock, N.K.; Landowski, N.

    2014-01-01

    Purpose – The purpose of this paper is to investigate the importance of communication that occurs just before workplace meetings (i.e. pre-meeting talk). The paper explores how four specific types of pre-meeting talk (small talk, work talk, meeting preparatory talk, and shop talk) impact

  9. Technical minutes of the eighth INDC meeting, Vienna, 6 - 10 October 1975

    International Nuclear Information System (INIS)

    Benzi, V.

    1977-01-01

    Neutron nuclear data (report on 11th four centre meeting; additional information from neutron data centres other than NDS; two years publication cycle of CINDA; international exchange and assessment of use of evaluated data); non-neutron nuclear data (progress reports on activities, services and coordination of ''non-neutron'' nuclear data centres and groups; report on meeting on charged particle nuclear data (CPND) for applications; discussion on recommendations from ''non-neutron'' nuclear data meetings April/May 1974, including plans for 1976 meetings); coordination of nuclear data activities (status of development of regional nuclear data centres and national data committees; neutron data for reactor dosimetry; FPND newsletter; WRENDA for fission, fusion and safeguards; nuclear data measurements in developing countries; status and NDS targets and samples program); progress reports on nuclear data measurements, facilities and evaluations (additions to submitted progress reports; reports on nuclear data activities in countries not represented on INDC); reports of Technical and Ad-hoc sub-committees; reports of policy sub-committees; meetings

  10. Meetings and meeting modeling in smart surroundings

    NARCIS (Netherlands)

    op den Akker, Hendrikus J.A.; Heylen, Dirk K.J.; Nijholt, Antinus; Nishida, T.

    2004-01-01

    In this paper we survey our research on smart meeting rooms and its relevance for augmented reality meeting support and virtual reality generation of meetings in real-time or off-line. Intelligent real-time and off-line generation requires understanding of what is going on during a meeting. The

  11. Project Plan for the evaluation of REDC waste for TRU-waste radionuclides

    International Nuclear Information System (INIS)

    Nguyen, L.; Yong, L.; Chapman, J.

    1996-09-01

    This project plan describes the plan to determine whether the solid radioactive wastes generated by the Radiochemical Engineering Development Center (REDC) meet the Department of Energy's definition of transuranic wastes. Existing waste characterization methods will be evaluated, as well as historical data, and recommendations will be made as necessary

  12. Experiences in manpower planning for geomatics

    Science.gov (United States)

    Fairbairn, D.

    2014-04-01

    This paper addresses the issue of manpower planning in meeting the needs of national and international economies for trained geomatics professionals. Estimated statistics for the numbers of such personnel, and experience in assessing recruitment into the profession reveal considerable skills gaps, particularly in the mature economies of the developed world. In general, centralised manpower planning has little official role in western economies. However, informal surveys of shortfalls in supply of qualified graduates in many fields, including geomatics, are undertaken by professional organisations, educational establishments and consultancies. This paper examines examples of such manpower surveys and considers whether more effective manpower planning would ensure a more efficient geomatics industry in a nation, and what the nature of such an exercise should be.

  13. Summary report of first research coordination meeting on Minor Actinide Nuclear Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Kaeppeler, F.; Mengoni, A.

    2008-09-01

    The first Research Co-ordination Meeting of the MANREAD (Minor Actinides Neutron Reaction Data) was held at the IAEA Headquarters in Vienna from 19 to 23 November 2007. A summary of the discussion which took place at the meeting is reported here. In addition, a task assignment list of the experimental data assessment activities was agreed, and is provided together with the plan for future CRP activities. (author)

  14. Meetings and Meeting Modeling in Smart Environments

    NARCIS (Netherlands)

    Nijholt, Antinus; op den Akker, Hendrikus J.A.; Heylen, Dirk K.J.

    In this paper we survey our research on smart meeting rooms and its relevance for augmented reality meeting support and virtual reality generation of meetings in real time or off-line. The research reported here forms part of the European 5th and 6th framework programme projects multi-modal meeting

  15. Quality Assurance Program Plan for the Waste Sampling and Characterization Facility

    International Nuclear Information System (INIS)

    Grabbe, R.R.

    1995-01-01

    The objective of this Quality Assurance Plan is to provide quality assurance (QA) guidance, implementation of regulatory QA requirements, and quality control (QC) specifications for analytical service. This document follows the Department of Energy (DOE)-issued Hanford Analytical Services Quality Assurance Plan (HASQAP) and additional federal [10 US Code of Federal Regulations (CFR) 830.120] QA requirements that HASQAP does not cover. This document describes how the laboratory implements QA requirements to meet the federal or state requirements, provides what are the default QC specifications, and/or identifies the procedural information that governs how the laboratory operates. In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. This document also covers QA elements that are required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAPPs), (QAMS-004), and Interim Guidelines and Specifications for Preparing Quality Assurance Product Plans (QAMS-005) from the Environmental Protection Agency (EPA). A QA Index is provided in the Appendix A

  16. 78 FR 72718 - NASA Advisory Council; Audit, Finance and Analysis Committee; Meeting

    Science.gov (United States)

    2013-12-03

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice: (13-139)] NASA Advisory Council; Audit... amended, the National Aeronautics and Space Administration announces a meeting of the Audit, Finance and... includes briefings on the following topics: Finance Update Budget Update NASA Strategic Planning and...

  17. Effects of planned group interactions on the social adaptation of individuals with an intestinal stoma: a quantitative study.

    Science.gov (United States)

    Karabulut, Hatice K; Dinç, Leyla; Karadag, Ayişe

    2014-10-01

    To investigate the effects of a planned group interaction method on the social adjustment of individuals with an intestinal stoma. Individuals with a stoma often experience physiological, psychological and social problems that affect their social adaptation. Quasi-experimental. The population included ileostomy and colostomy patients registered at the Gazi University Health Research and Implementation Centre Stoma therapy Unit between September 2011-June 2012. They were assigned to experimental (n = 23) and control (n = 27) groups based on their willingness to attend planned group interaction meetings. Experimental group members participated in the 'planned group interaction method' for six weeks. Control group members only received routine care services. Weekly group interaction meetings lasted for average of 90 minutes. The Ostomy Adjustment Inventory and Psychosocial Adjustment to Illness Scale-Self-Report Scale were administered to experimental group members on three occasions: prior to the first group meeting, after the six-week meeting process ended and during the first month after group meetings ended. Control group evaluations were conducted simultaneously. Experimental group members' ostomy adjustment mean scores after planned group interaction meetings gradually increased. No changes occurred in the control group's average scores. The experimental and control groups' average psychosocial adjustment scores eventually changed and showed a tendency towards adjustment. Experimental group members aged 51-60 and 61-70, who were married, had primary and higher education, had permanent stomas, had stomas for periods between 12 months or less and 61 months and longer and had sufficient stoma care knowledge demonstrated higher adjustment values (p stoma care and daily life. Planned group interactions effectively enhanced the social adjustment of patients with a stoma. Group interaction methods should be included in nursing care practices for individuals with a

  18. 78 FR 46365 - Notice of Public Meetings for Cedar Creek and Belle Grove National Historical Park Advisory...

    Science.gov (United States)

    2013-07-31

    ... management plan. DATE: September 19, 2013. Location: Strasburg Town Hall Council Chambers, 174 East King Street, Strasburg, VA 22657. Date: December 19, 2013. Location: Middletown Town Council Chambers, 7875... implementation of the plan, or the business of the Commission are encouraged to attend the meetings. Interested...

  19. 78 FR 5413 - Agenda and Notice of Public Meetings of the Massachusetts Advisory Committee

    Science.gov (United States)

    2013-01-25

    .... The purpose of the meetings are orientation and project planning. Members of the public are entitled... needing accessibility services should contact the Eastern Regional Office at least 10 working days before...

  20. 76 FR 11211 - Meeting of the Advisory Council on Dependents' Education

    Science.gov (United States)

    2011-03-01

    ... Advisory Council on Dependents' Education will take place: DATES: Thursday, April 21, 2011, 6 p.m. to 11 p... submit written statements to the Advisory Council on Dependents' Education about its mission and... planned meeting of the Advisory Council on Dependents' Education. All written statements shall be...

  1. NIFS joint research meeting on plasma facing components, PSI, and heat/particle control

    International Nuclear Information System (INIS)

    Yamashina, T.

    1997-10-01

    The LHD collaboration has been started in 1996. Particle and heat control is one of the categories for the collaboration, and a few programs have been nominated in these two years. A joint research meeting on PFC, PSI, heat and particle meeting was held at NIFS on June 27, 1997, in which present status of these programs were reported. This is a collection of the notes and view graphs presented in this meeting. Brief reviews and research plan of each program are included in relation to divertor erosion and sputtering, impurity generation, hydrogen recycling, edge plasma structure, edge transport and its control, heat removal, particle exhaust, wall conditioning etc. (author)

  2. Light Duty Utility Arm Software Test Plan

    International Nuclear Information System (INIS)

    Kiebel, G.R.

    1995-01-01

    This plan describes how validation testing of the software will be implemented for the integrated control and data acquisition system of the Light Duty Utility Arm System (LDUA). The purpose of LDUA software validation testing is to demonstrate and document that the LDUA software meets its software requirements specification

  3. 76 FR 78942 - Draft Environmental Impact Statement and Proposed Vernal Pool Habitat Conservation Plan for the...

    Science.gov (United States)

    2011-12-20

    ... activities associated with urban development activities. We also announce plans for a public scoping meeting... planning area and their possible impacts on the species; 5. The presence of archeological sites, buildings...

  4. Summary report of consultants meeting on Minor Actinide Nuclear Reaction Data (MANREAD)

    International Nuclear Information System (INIS)

    Plompen, A.; Mengoni, A.

    2007-10-01

    A Consultants Meeting on reaction cross section data for minor actinides was held at the IAEA Headquarters, in Vienna on 23 and 24 November, 2007. The main objective of the initiative was to define the detailed plan for the Co-ordinated Research Project on Minor Actinide Neutron Reaction Data (MANREAD) CRP. The details of the discussions which took place at the reported meeting include a review of the current activities in the field, a list of recommendations and a proposed timescale for the CRP. (author)

  5. Assessment of LANL waste minimization plan

    International Nuclear Information System (INIS)

    Davis, K.D.; McNair, D.A.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to evaluate the Los Alamos National Laboratory (LANL) Waste Minimization Plan to determine if it meets applicable internal (DOE) and regulatory requirements. The intent of the effort is to assess the higher level elements of the documentation to determine if they have been addressed rather than the detailed mechanics of the program's implementation. The requirement for a Waste Minimization Plan is based in several DOE Orders as well as environmental laws and regulations. Table 2-1 provides a list of the major documents or regulations that require waste minimization efforts. The table also summarizes the applicable requirements

  6. INEEL Institutional Plan - FY 2000-2004

    International Nuclear Information System (INIS)

    Enge, Ray Stevenson

    1999-01-01

    In this first Institutional Plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus it's efforts on three strategic thrusts; (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemical from biomass). The first strategic thrust focuses on meeting DOE-EM's environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NE's needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this Institutional Plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this Institutional Plan will offer additional content and resource refinements

  7. Adaptive Planning: Understanding Organizational Workload to Capability/ Capacity through Modeling and Simulation

    Science.gov (United States)

    Hase, Chris

    2010-01-01

    In August 2003, the Secretary of Defense (SECDEF) established the Adaptive Planning (AP) initiative [1] with an objective of reducing the time necessary to develop and revise Combatant Commander (COCOM) contingency plans and increase SECDEF plan visibility. In addition to reducing the traditional plan development timeline from twenty-four months to less than twelve months (with a goal of six months)[2], AP increased plan visibility to Department of Defense (DoD) leadership through In-Progress Reviews (IPRs). The IPR process, as well as the increased number of campaign and contingency plans COCOMs had to develop, increased the workload while the number of planners remained fixed. Several efforts from collaborative planning tools to streamlined processes were initiated to compensate for the increased workload enabling COCOMS to better meet shorter planning timelines. This paper examines the Joint Strategic Capabilities Plan (JSCP) directed contingency planning and staffing requirements assigned to a combatant commander staff through the lens of modeling and simulation. The dynamics of developing a COCOM plan are captured with an ExtendSim [3] simulation. The resulting analysis provides a quantifiable means by which to measure a combatant commander staffs workload associated with development and staffing JSCP [4] directed contingency plans with COCOM capability/capacity. Modeling and simulation bring significant opportunities in measuring the sensitivity of key variables in the assessment of workload to capability/capacity analysis. Gaining an understanding of the relationship between plan complexity, number of plans, planning processes, and number of planners with time required for plan development provides valuable information to DoD leadership. Through modeling and simulation AP leadership can gain greater insight in making key decisions on knowing where to best allocate scarce resources in an effort to meet DoD planning objectives.

  8. 76 FR 62758 - Wallowa-Whitman and Umatilla National Forests, Oregon Granite Creek Watershed Mining Plans

    Science.gov (United States)

    2011-10-11

    ... environmental analyses for proposed mining Plans in the portions of the Granite Creek Watershed under their... Granite Creek Watershed Mining Plans analysis area that meets the Purpose of and Need for Action. It is... Granite Creek Watershed Mining Plans AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an...

  9. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    Science.gov (United States)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  10. Multi-Year Program Plan 2011-2015

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  11. 77 FR 19179 - Emerging Technology and Research Advisory Committee; Notice of Partially Closed Meeting

    Science.gov (United States)

    2012-03-30

    ...: 8:30 a.m.-3:30 p.m. 1. ETRAC Committee Business. 2. Nanotechnology--Nanocoated Materials. 3. Science and Engineering Indicators. 4. ETRAC Committee Discussion. 5. Planning for Next Meeting. The open...

  12. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  13. Drinking water protection plan; a discussion document

    International Nuclear Information System (INIS)

    2001-01-01

    This draft document outlines the plan of action devised by the Government of British Columbia in an effort to safeguard the purity of the drinking water supply in the province, and invites British Columbians to participate in the elaboration of such a plan. This document concentrates on the assessment of the sources of the water supply (watersheds and aquifers) and on measures to ensure the integrity of the system of water treatment and distribution as the principal components of a comprehensive plan to protect drinking water. The proposed plan involves a multi-barrier approach that will use a combination of measures to ensure that water sources are properly managed and waterworks systems provide safe drinking water. New drinking water planning procedures, more effective local influence and authority, enforceable standards, better access to information and public education programs form the essence of the plan. A series of public meetings are scheduled to provide the public at large with opportunities to comment on the government's plan of action and to offer suggestions for additional measures

  14. [Consumer satisfaction study in philanthropic hospital health plans].

    Science.gov (United States)

    Gerschman, Silvia; Veiga, Luciana; Guimarães, César; Ugá, Maria Alicia Dominguez; Portela, Margareth Crisóstomo; Vasconcellos, Miguel Murat; Barbosa, Pedro Ribeiro; Lima, Sheyla Maria Lemos

    2007-01-01

    This paper presents the findings of research aimed at identifying and analyzing the argumentation and rationale that justify the satisfaction of consumers with their health plans. The qualitative method applied used the focus group technique, for which the following aspects were defined: the criteria for choosing the health plans which were considered, the composition of the group and its distribution, recruitment strategy, and infrastructure and dynamics of the meetings. The health plan beneficiaries were classified into groups according to their social class, the place where they lived, mainly, the relationship that they established with the health plan operators which enabled us to develop a typology for the plan beneficiaries. Initially, we indicated how the health plan beneficiaries assess and use the Brazilian Unified Health System (SUS), and, then, considering the types of plans defined, we evaluated their degree of satisfaction with the different aspects of health care, and identified which aspects mostly contributed explain their satisfaction.

  15. MANAGEMENT BOARD MEETING OF 29th AUGUST 2002

    CERN Multimedia

    2002-01-01

    'Morges III' Manpower Planning Review The Director-General announced that at the end of September he would be visiting each division in turn with a view to discussing their projected resources and requirements prior to the CERN-wide manpower planning workshop known as 'Morges III' on 28th and 29th October. To allow the Human Resources Review Board (HRRB) and the Planning Unit to pursue their preparatory work in parallel, divisions were requested to comply with the 1st September deadline for the prioritisation of the specific work packages and services needed to fulfil their respective mandates, with consolidated data for each sector to be submitted to the Chairman of the HRRB, J. van der Boon, by 21st September. Ultimately, the results of the 'Morges III' exercise would serve as the basis for the 2003-2010 staff plan to be presented to the Council in December. Preparation of the September Committee Meetings The Director-General observed that one of the main items on the agenda of the Committee of Council's me...

  16. Onboard autonomous mission re-planning for multi-satellite system

    Science.gov (United States)

    Zheng, Zixuan; Guo, Jian; Gill, Eberhard

    2018-04-01

    This paper presents an onboard autonomous mission re-planning system for Multi-Satellites System (MSS) to perform onboard re-planing in disruptive situations. The proposed re-planning system can deal with different potential emergency situations. This paper uses Multi-Objective Hybrid Dynamic Mutation Genetic Algorithm (MO-HDM GA) combined with re-planning techniques as the core algorithm. The Cyclically Re-planning Method (CRM) and the Near Real-time Re-planning Method (NRRM) are developed to meet different mission requirements. Simulations results show that both methods can provide feasible re-planning sequences under unforeseen situations. The comparisons illustrate that using the CRM is average 20% faster than the NRRM on computation time. However, by using the NRRM more raw data can be observed and transmitted than using the CRM within the same period. The usability of this onboard re-planning system is not limited to multi-satellite system. Other mission planning and re-planning problems related to autonomous multiple vehicles with similar demands are also applicable.

  17. 75 FR 51103 - Notice of Public Meetings for the National Park Service (NPS) Alaska Region's Subsistence...

    Science.gov (United States)

    2010-08-18

    ... SRC and Wrangell-St. Elias SRC plan to meet to develop and continue work on National Park Service (NPS... reconvene on Thursday, October 7, 2010, from 9 a.m. to 5 p.m. or until business is completed. This meeting will be held at Fast Eddy's Motel and Restaurant located at Mile 1313 on the Alaska Highway in Tok, AK...

  18. Master-planned in exurbia: examining the drivers and impacts of master-planned communities at the urban fringe

    Science.gov (United States)

    Jenna H. Tilt; Lee. Cerveny

    2013-01-01

    Smart growth strategies of infill and compact growth in existing suburban cities will most likely not be sufficient to absorb a new US household growth in the future. To meet housing demands and preferences, master-planned communities will continue to be built in outlying exurban areas. However, little is known about the impacts these communities may have on the...

  19. 76 FR 17471 - Air Tour Management Plan for Haleakala National Park, Maui, HI; Public Meeting/Notice of...

    Science.gov (United States)

    2011-03-29

    ... Haleakala National Park, Maui, HI; Public Meeting/Notice of Availability, Review, and Comment on...), Alexa Higashi Meeting Room, One Cameron Way, Kahului, HI 96732. Wednesday, April 13, 2011, 5 p.m.-7 p.m. Kula Community Center, 3690 Lower Kula Road, Kula, HI 96790. Thursday, April 14, 2011, 5 p.m.-7 p.m...

  20. Utilisation of a trauma meeting handover proforma to improve trauma patient pathway.

    Science.gov (United States)

    Smyth, Rachel; Parton, Felicity; Trikha, Paul

    2015-01-01

    Decision making within orthopaedic centres predominantly occurs at the trauma meeting, where all decisions are made as a part of the multidisciplinary process. This is an essential handover process. Difficulties occur when teaching and detailed case discussions detract from the actual decision making process, leading to failure in documentation and implementing treatment plans. An audit was carried out in a busy district general hospital (DGH), assessing the quality of trauma meeting documentation in patient records, and assessing whether the introduction of a proforma document would improve this. Prospective clinical reviews were performed on all patients discussed in the trauma meeting over a one month period. Following the initial audit cycle a proforma was introduced, and the audit process was repeated at a two month and six month interval. The quality of the entries were assessed and compared to the Academy of Medical Royal Colleges Standards for the clinical structure and content of patient records, and The Royal College of Surgeons (RCS) of England Guidelines for Clinicians on Medical Records and Notes. Sixty three patient records during a one month period from 1 August 2014 found that only 16% had any documentation of the trauma meeting, none of which met the standard set at the beginning of the audit. Following the introduction of the proforma, 102 patient records were reviewed from October 2014, showing 70% had documentation of the trauma meeting. This improved further to 84% in February 2015. The proforma has provided an effective means of documenting and communicating management plans, and in turn also improved the trauma patient pathway to theatre or discharge.