  1. System design document for the INFLO prototype.

    Science.gov (United States)

    2014-03-01

    This report documents the high level System Design Document (SDD) for the prototype development and : demonstration of the Intelligent Network Flow Optimization (INFLO) application bundle, with a focus on the Speed : Harmonization (SPD-HARM) and Queu...

  2. Prototype Hanford Surface Barrier: Design basis document

    International Nuclear Information System (INIS)

    Myers, D.R.; Duranceau, D.A.

    1994-11-01

    The Hanford Site Surface Barrier Development Program (BDP) was organized in 1985 to develop the technology needed to provide a long-term surface barrier capability for the Hanford Site and other arid sites. This document provides the basis of the prototype barrier. Engineers and scientists have momentarily frozen evolving barrier designs and incorporated the latest findings from BDP tasks. The design and construction of the prototype barrier has required that all of the various components of the barrier be brought together into an integrated system. This integration is particularly important because some of the components of the protective barreir have been developed independently of other barreir components. This document serves as the baseline by which future modifications or other barrier designs can be compared. Also, this document contains the minutes of meeting convened during the definitive design process in which critical decisions affecting the prototype barrier's design were made and the construction drawings

  3. ITER ECRH Upper Launcher: Test plan for qualification of the Diamond Torus Window Prototype III

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Gagliardi, Mario; Saibene, Gabriella [F4E, Antennas and Plasma Engineering, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany)

    2016-11-01

    Highlights: • A qualification program for the ITER diamond torus window is being developed. • The testing program for the qualification of the bare diamond disk is defined. • First qualification tests show a very good quality of the diamond disk prototypes. - Abstract: The diamond window is part of the electron cyclotron heating upper launcher system for ITER. Together with the isolation valve it constitutes the primary vacuum boundary and it also acts as first tritium barrier. Therefore the window is classified as Safety/Protection Important Component (SIC/PIC) with the nuclear safety function “confinement”. As the diamond window unit is not entirely covered by standard codes, an ad-hoc qualification program needs to be defined, including analysis, prototyping and testing. In the framework of a contract with F4E, the test program for a diamond window prototype is being developed with the aim to prove its operability for normal, accidental and incidental conditions as identified in the ITER load specifications. Tests range from dielectric loss measurements for the bare Chemical Vapour Deposition (CVD) diamond disk up to mechanical and vacuum tests for the complete window assembly. Finally mm-wave properties have to be characterized for the complete window. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete documentation of the process. This paper will present the development of the test plan for a window prototype, which is currently under manufacturing. First tests are directed to the characterization of the bare diamond disk with a focus on its dielectric properties.

  4. Full parabolic trough qualification from prototype to demonstration loop

    Science.gov (United States)

    Janotte, Nicole; Lüpfert, Eckhard; Pottler, Klaus; Schmitz, Mark

    2017-06-01

    On the example of the HelioTrough® collector development the full accompanying and supporting qualification program for large-scale parabolic trough collectors for solar thermal power plants is described from prototype to demonstration loop scale. In the evaluation process the actual state and the optimization potential are assessed. This includes the optical and geometrical performance determined by concentrator shape, deformation, assembly quality and local intercept factor values. Furthermore, its mechanical performance in terms of tracking accuracy and torsional stiffness and its thermal system performance on the basis of the overall thermal output and heat loss are evaluated. Demonstration loop tests deliver results of collector modules statistical slope deviation of 1.9 to 2.6 mrad, intercept factor above 98%, peak optical performance of 81.6% and heat loss coefficients from field tests. The benefit of such a closely monitored development lies in prompt feedback on strengths, weaknesses and potential improvements on the new product at any development stage from first module tests until demonstration loop evaluation. The product developer takes advantage of the achieved technical maturity, already before the implementation in a commercial power plant. The well-understood performance characteristics allow the reduction of safety margins making the new HelioTrough collector competitive from the start.

  5. ITER ECRH upper launcher torus diamond window – Prototyping, testing and qualification

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Ikeda, Ryosuke; Oda, Yasuhisa; Sakamoto, Keishi; Takahashi, Koji [Japan Atomic Energy Agency (JAEA), Plasma Heating Technology Group, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany)

    2015-10-15

    Highlights: • The diamond window prototype shows a very good transmission capability during high power RF experiments. • An ad-hoc qualification programme for the diamond torus window is being developed (contract between KIT and F4E). • The window design has been updated focused on its mechanical integrity and manufacturing aspects. - Abstract: The diamond window assembly is part of the ITER primary vacuum boundary and acts as the first tritium barrier and therefore it is classified as Safety/Protection Important Component (SIC/PIC). It consists of an ultra-low loss CVD diamond disk mounted in a system of metallic parts (copper/steel) and has to fulfil adequate transmission capability for high power mm-waves. High power RF experiments with a 1st window prototype had shown parasitic heating due to small gaps in the housing. After a design optimization directed to the mm-wave properties, the parasitic excitations of oscillations have been avoided in a 2nd prototype. This one is equipped with inserted waveguide structures, which cover gaps in the metallic structure of the window housing. From high power RF-measurements with a 0.86 MW/100 s pulse a loss tangent of 7.1 × 10{sup −6} could be estimated, corresponding to an increase of temperature of only 120 mK between inlet and outlet of the cooling system. The diamond window assemblies cannot be entirely covered by codes and standards. To comply with the French safety regulations, instead an ad-hoc qualification programme is required, being developed in the framework of a contract between KIT and F4E. A new prototype (3rd) will be built, which is designed to fit to the single HELICOFLEX sealed waveguide structures of the ex-vessel mm-system of the EC upper launcher (UL). The testing programme ranges from mechanical to vacuum tests up to dielectric loss measurements at low and high power. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete

  6. Mock-up qualification and prototype manufacture for ITER current leads

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Tingzhi, E-mail: tingszhou@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Lu, Kun; Ran, Qingxiang; Ding, Kaizhong; Feng, Hansheng; Wu, Huan; Liu, Chenglian; Song, Yuntao [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Niu, Erwu [CNDA, Ministry of Science and Technology, Beijing (China); Bauer, Pierre; Devred, Arnaud [Magnet Division, ITER Organization, Cadarache (France)

    2015-10-15

    Highlights: • Vacuum brazing and electron beam welding qualification. • Machine and assembly strategy of fin type heat exchanger. • Soldering and joint resistance test of superconducting joint. • Pre-preg technology with vacuum bag on insulation. - Abstract: Three types of high temperature superconducting current leads (HTSCL) are designed to carry 68 kA, 55 kA or 10 kA to the ITER magnets. Before the supply of the HTS current lead series, the design and manufacturing process is qualified through mock-ups and prototypes. Seven mock-ups, representing the critical technologies of the current leads, were built and tested successfully in the Institute of Plasma Physics of the Chinese Academy of Sciences (ASIPP) in 2013. After the qualification some design features of the HTS leads were updated. This paper summarizes the qualification through mock-ups. In 2014 ASIPP started the manufacture of the prototypes. The preparation and manufacturing process are also described.

  7. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    International Nuclear Information System (INIS)

    Banetta, S.; Bellin, B.; Lorenzetto, P.; Zacchia, F.; Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P.; Mitteau, R.; Eaton, R.; Raffray, R.; Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T.

    2015-01-01

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m"2). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m"2 show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m"2 is described in detail.

  8. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    Energy Technology Data Exchange (ETDEWEB)

    Banetta, S., E-mail: stefano.banetta@f4e.europa.eu [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Bellin, B.; Lorenzetto, P.; Zacchia, F. [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P. [AREVA NP PTCMI-F, Centre Technique, Fusion, 71200 Le Creusot (France); Mitteau, R.; Eaton, R.; Raffray, R. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T. [Forschungszentrum Jülich, Institute of Energy and Climate Research, Jülich (Germany)

    2015-10-15

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m{sup 2}). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m{sup 2} show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m{sup 2} is described in detail.

  9. Design evaluation of the semi-prototype for the ITER blanket first wall qualification

    International Nuclear Information System (INIS)

    Lee, Dong Won; Bae, Young Dug; Kim, Suk Kwon; Kim, Sun Ho; Hong, Bong Guen; Bang, In Cheol

    2010-01-01

    For the second qualification of the First Wall (FW) procurement of the International Thermonuclear Experimental Reactor (ITER), a semi-prototype of the FW has been designed with increased local surface heat flux up to 5 MW/m 2 . With the given conditions, the new semi-prototype design was simulated with the commercial CFD code, the ANSYS-11. The results show that the semi-prototype temperature exceeds the melting temperature of Be, and the current design is required to be modified. In order to enhance cooling, a hypervapotron was added in the design and an analysis with the same code was performed. The results show that the temperature with the hypervapotron reduced by around 100 o C but it was still higher than the melting temperature of Be. The hypervapotron mock-up was fabricated and tested with a variance of inlet coolant flow rates and heat fluxes of up to 1.75 MW/m 2 using the second Korea Heat Load Test (KoHLT-2) facility, in which heat was loaded by a graphite heater through radiation heating. Wall and coolant temperatures were measured and compared with the simulation results. So far, there is a large difference between the experiments and the simulation, and a next experiment is being prepared.

  10. Environmental qualification - walkdowns: The documentation of configuration information for safety related components, equipment and systems

    International Nuclear Information System (INIS)

    Melmer, J.; Waters, M.

    1995-01-01

    Environmental Qualification walkdowns are conducted to collect field data to verify/validate/document configurations of safety related equipment and systems. This paper describes the process for conducting walkdowns and the justification for using an electronic format. The following are described: a) Background; b) Preparing, executing and processing walkdowns; c) Hardware/software; d) Impact of a paperless system on walkdown execution, maintenance and work planning; e) Other applications for the technology

  11. Synthesis of the IRSN report on its analysis of the safety guidance package (DOrS) of the ASTRID reactor project. Safety guidance document for the ASTRID prototype: Referral to the GPR. Opinion related to the safety guidance document of the ASTRID reactor project. ASTRID prototype: Safety guidance document for the ASTRID prototype

    International Nuclear Information System (INIS)

    Lachaume, Jean-Luc; Niel, Jean-Christophe

    2013-01-01

    A first document indicates the improvement guidelines for the ASTRID project based on the French experience in the field of sodium-cooled fast neutron reactors, addresses the safety objectives as they are presented for the ASTRID project, discusses how the project includes a regulation and design referential, and how it addresses various aspects of the design approach (ranking and analysis of operation situations, defence in depth, use of probabilistic studies, safety classification and qualification to accidental situations, taking internal and external aggressions into account and taking severe accidents into account at the design level). It comments the guidelines related to the first two barriers, to main safety functions (control of reactivity and of reactor cooling, containment of radioactive and toxic materials), to dismantling, to R and D for safety support. A second document is a letter sent by the ASN to the GPR (permanent group of experts in charge of nuclear reactors) about the safety guidance document for the ASTRID prototype. The third document is the answer and contains comments and recommendations by this group about the content of this document, and therefore addresses the same topics as the first document. The last document defines the framework of the approach to this document

  12. Nuclear EQ sourcebook: A compilation of documents for nuclear equipment qualification

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    In the nuclear power industry, environmental and seismic qualification of safety-related electrical and instrumentation equipment is collectively known as Equipment Qualification (EQ). Related technology, as well as regulatory requirements, have evolved rapidly during the last 15 years. For environmental qualification, what began in 1971 with one trial-use guide (IEEE Std 323-1971), now stands as a full complement of Nuclear Regulatory Commission (NRC) rules, guides and industry standards. In addition to the Institute of Electrical and Electronics Engineers (IEEE), the American Society of Mechanical Engineers (ASME) has also undertaken development of its own set of standards for use in qualifying safety-related mechanical equipment. To ensure that the original design and qualification is preserved, engineers need to select and use the correct set of NRC regulations, regulatory guides, industry standards, and generic correspondence. Given that the total number of these documents exceed 200, this task becomes resource intensive. This compilation is the first known publication available to serve the user-community need for a complete and exhaustive single source. Approximately 180 items (Bulletins, Federal Rules, Generic Letters, Notices, Regulatory Guides, IEEE Standards, IEEE Recommended Practices, and IEEE Guides) have been processed separately for inclusion on the data base

  13. Supplement to nuclear EQ sourcebook: A compilation of documents for nuclear equipment qualification

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    In the nuclear power industry, environmental and seismic qualification of safety-related electrical and instrumentation equipment is collectively known as Equipment Qualification (EQ). Related technology, as well as regulatory requirements, have evolved rapidly during the last 15 years. For environmental qualification, what began in 1971 with one trial-use guide (IEEE Std 323-1971), now stands as a full complement of Nuclear Regulatory Commission (NRC) rules, guides, and industry standards. As the original 1992 version of the Nuclear EQ Sourcebook was compiled to serve the user-community need for a complete and exhaustive single source of nuclear EQ documentation, this Supplement is published to provide the user community with nuclear EQ documentation revisions and updates that have been published since the publication of the original volume in May of 1992. The first volume of this publication included documents issued before December, 1991. That first volume was well received and also prompted positive response from industry on its usefulness and on recommendations to improve the completeness and enhance the ease of use. This Supplement, therefore, includes new documents, revisions, and updates issued and published since December 1991 and up to and including March 1993. It incorporates various enhancements in order to better serve the user community. One such enhancement included in this Supplement is the new Equipment Classification Index that is described in the User Guide section of this publication. 37 papers, including Bulletins, Federal rules, Generic Letters, Notices, Regulatory Guides, IEEE Standards, IEEE Recommended Practices, and IEEE Guides, have been processed separately for inclusion on the data base

  14. Design document for landfill capping Prototype Decision Support System

    International Nuclear Information System (INIS)

    Stone, J.J.; Paige, G.; Hakonson, T.E.; Lane, L.J.

    1994-01-01

    The overall objective of the Prototype Decision Support System for shallow land burial project is to ''Develop a Decision Support System tool which incorporates simulation modeling and multi-objective decision theory for the purpose of designing and evaluating alternative trench cap designs for mixed waste landfill covers. The goal is to improve the quality of technical information used by the risk manager to select landfill cover designs while taking into account technological, economical, and regulatory factors.'' The complexity of the technical and non-technical information, and how the information varies in importance across sites, points to the need for decision analysis tools that provide a common basis for integrating, synthesizing, and valuing the decision input. Because the cost of remediating thousands of contaminated DOE sites is projected to be in the 10's--100's of billions of dollars, methods will be needed to establish cleanup priorities and to help in the selection and evaluation of cost effective remediation alternatives. Even at this early stage in DOE's cleanup program, it is certain that capping technologies will be heavily relied upon to remediate the 3000+ landfills on DOE property. Capping is favored in remediating most DOE landfills because, based on preliminary baseline risk assessments, human and ecological risks are considered to be low at most of these sites and the regulatory requirements for final closure of old landfills can be met using a well designed cap to isolate the buried waste. This report describes a program plan to design, develop, and test a decision support system (DSS) for assisting the DOE risk manager in evaluating capping alternatives for radioactive and hazardous waste landfills. The DOE DSS will incorporate methods for calculating, integrating and valuing technical, regulatory, and economic criteria

  15. Progress of ITER full tungsten divertor technology qualification in Japan: Manufacturing full-scale plasma-facing unit prototypes

    International Nuclear Information System (INIS)

    Ezato, Koichiro; Suzuki, Satoshi; Seki, Yohji; Yamada, Hirokazu; Hirayama, Tomoyuki; Yokoyama, Kenji; Escourbiac, Frederic; Hirai, Takeshi

    2016-01-01

    Highlights: • JADA has demonstrated the feasibility of manufacturing the full-W plasma-facing units (W-PFU). • The surface profiles of the W monoblocks of the W-PFU prototypes on the test frame to mimic the support structure of the ITER OVT were examined by using an optical three-dimensional measurement system. The results show the most W monoblock surface in the target part locates within + 0.25 mm from the CAD data. • The strict profile control with the profile tolerance of ±0.3 mm is imposed on the OVT to prevent the leading edges of the W monoblocks from over-heating. • The present full-scale prototyping demonstrates to satisfy this requirement on the surface profile. • It can be concluded that the technical maturities of JADA and its suppliers are as high as to start series manufacturing the ITER divertor components. - Abstract: Japan Atomic Energy Agency (JAEA) is in progress for technology demonstration toward Full-tungsten (W) ITER divertor outer vertical target (OVT), especially, W monoblock technology that needs to withstand the repetitive heat load as high as 20 MW/m 2 for 10 s. Under the framework of the W divertor qualification program developed ITER organization, JAEA as Japanese Domestic Agency (JADA) manufactured seven full-scale plasma-facing unit (PFU) prototypes with the Japanese industries. Four prototypes that have 146 W monoblock joint with casted copper (Cu) interlayer passed successfully the ultrasonic testing. In the other three prototypes that have the different W/Cu interlayer joint, joint defects were found. The dimension measurements reveal the requirements of the gap between W monoblocks and the surface profile of PFU are feasible.

  16. Progress of ITER full tungsten divertor technology qualification in Japan: Manufacturing full-scale plasma-facing unit prototypes

    Energy Technology Data Exchange (ETDEWEB)

    Ezato, Koichiro, E-mail: ezato.koichiro@jaea.go.jp [Department of ITER Project, Naka Fusion Institute, Sector of Fusion Research and Development, Japan Atomic Energy Agency (Japan); Suzuki, Satoshi; Seki, Yohji; Yamada, Hirokazu; Hirayama, Tomoyuki; Yokoyama, Kenji [Department of ITER Project, Naka Fusion Institute, Sector of Fusion Research and Development, Japan Atomic Energy Agency (Japan); Escourbiac, Frederic; Hirai, Takeshi [ITER Organization, route de vinon sur Verdon, 13067 St Paul lez Durance (France)

    2016-11-01

    Highlights: • JADA has demonstrated the feasibility of manufacturing the full-W plasma-facing units (W-PFU). • The surface profiles of the W monoblocks of the W-PFU prototypes on the test frame to mimic the support structure of the ITER OVT were examined by using an optical three-dimensional measurement system. The results show the most W monoblock surface in the target part locates within + 0.25 mm from the CAD data. • The strict profile control with the profile tolerance of ±0.3 mm is imposed on the OVT to prevent the leading edges of the W monoblocks from over-heating. • The present full-scale prototyping demonstrates to satisfy this requirement on the surface profile. • It can be concluded that the technical maturities of JADA and its suppliers are as high as to start series manufacturing the ITER divertor components. - Abstract: Japan Atomic Energy Agency (JAEA) is in progress for technology demonstration toward Full-tungsten (W) ITER divertor outer vertical target (OVT), especially, W monoblock technology that needs to withstand the repetitive heat load as high as 20 MW/m{sup 2} for 10 s. Under the framework of the W divertor qualification program developed ITER organization, JAEA as Japanese Domestic Agency (JADA) manufactured seven full-scale plasma-facing unit (PFU) prototypes with the Japanese industries. Four prototypes that have 146 W monoblock joint with casted copper (Cu) interlayer passed successfully the ultrasonic testing. In the other three prototypes that have the different W/Cu interlayer joint, joint defects were found. The dimension measurements reveal the requirements of the gap between W monoblocks and the surface profile of PFU are feasible.

  17. A prototype of a documentation system that supports the development and maintenance of product configuration systems

    DEFF Research Database (Denmark)

    Haug, Anders; Degn, Anders; Poulsen, Bjarne

    2007-01-01

    , such as shorter lead times, reductions of resources needed and fewer errors. A procedure for the development and maintenance of PCSs, which has been applied in configuration projects for more than ten years, includes three main modelling techniques to support the development and maintenance of PCSs. Unfortunately...... system that supports the development and maintenance of PCSs. This article describes how some of this research has been converted into a prototype of a documentation system and what has been learned from the evaluation of the prototype...

  18. NASAwide electronic publishing system: Prototype STI electronic document distribution, stage-4 evaluation report

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual frame work, functional description, and technical report server of the STI Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware, and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices, which arc contained in Part 2 of this document, consist of (1) STI EDD Project Plan, (2) Team members, (3) Phasing Schedules, (4) Accessing On-line Reports, and (5) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desktop publishing systems, and technical report servers to be able to provide to NASA's engineers, researchers, scientists, and external users the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  19. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  20. Mechanical properties used for the qualification of transport casks: Prototype development and extension to serial production

    International Nuclear Information System (INIS)

    Salzbrenner, R.; Crenshaw, T.B.; Sorenson, K.B.

    1991-01-01

    A thorough understanding of the mechanical behavior of material in a specific cask is required to properly analyze the structural response of the cask. An appropriate way to establish this understanding is through laboratory testing of cask material. The laboratory testing that was done to support the MOSAIK Drop Test Program is summarized as an example of how mechanical properties can be mapped for a prototype cask. The broad range behavior to be understood. This is necessary for the proper application of fracture mechanics, and focuses on fracture toughness as the inherent materials property which quantifies the fracture resistance of a material. The understanding established by a mechanics to a particular prototype, behavior of a prototype must be correctly associated with parameters which can be measured on production casks. Since the production casks cannot be destructively tested, measurements are commonly made on sub-size specimens. This may prevent direct measurement of valid design properties. An additional database may then be required to establish the correlation between sub-size specimen measurements and valid design properties. This is illustrated by outlining the additional testing which would be necessary to allow the successful verification of the MOSAIK Drop Test Program to be extended from the prototype to serially produced casks

  1. Mechanical properties used for the qualification of transport casks: Prototype development and extension to serial production

    International Nuclear Information System (INIS)

    Salzbrenner, R.; Crenshaw, T.B.; Sorenson, K.B.

    1992-01-01

    A thorough understanding of the mechanical behavior of material in a specific cask is required to properly analyze the structural response of the cask. An appropriate way to establish this understanding is through laboratory testing of cask material. The laboratory testing that was done to support the MOSAIK Drop Test Program is summarized as an example of how mechanical properties can be mapped for a prototype cask. The broad range of measured properties allows the critical aspects of mechanical behavior to be understood. This is necessary for the proper application of fracture mechanics, and focuses on fracture toughness as the inherent materials property which quantifies the fracture resistance of a material. The general fracture mechanics approach and its application to specific cask designs are described elsewhere (Salzbrenner et al. 1990, Sorenson et al. 1992a, Sorenson et al. 1992b). The understanding established by a thorough mapping of the mechanical properties is necessary to apply fracture mechanics to a particular prototype, but it is not sufficient for qualifying serially produced casks. The mechanical behavior of a prototype must be correctly associated with parameters which can be measured on production casks. Since the production casks cannot be destructively tested, measurements are commonly made on sub-size specimens. This may prevent direct measurement of valid design properties. An additional database may then be required to establish the correlation between sub-size specimen measurements and valid design properties. This is illustrated by outlining the additional testing which would be necessary to allow the successful verification of the MOSAIK Drop Test Program to be extended from the prototype to serially produced casks

  2. NRC Information No. 88-04: Inadequate qualification and documentation of fire barrier penetration seals

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    The current NRC review was prompted by reports, inspection findings, allegations, and other information that indicated the possibility that NRC requirements for fire barrier penetration seals were not being met in all aspects. The review included: evaluations of fire barrier penetration seal specifications and procedures developed by licensees, licensee agents, and licensee contractors; evaluations of various fire barrier penetration seal tests and test data; and inspections of various fire barrier penetrations seal designs and installations. The types of concerns identified to date and mentioned below are related to weaknesses in the implementation of NRC requirements and guidelines as related to fire barrier penetration seal design qualification. The NRC review also has identified a current practice that can affect the qualification status of installed seals. Plant modifications are being made that require running new cable and conduits through existing penetration seals. These modifications are generally being made without an associated technical review to ensure that the resulting penetration seal design configuration or design parameters are consistent with those validated by initial qualification tests. Over a period of time, numerous minor modifications to the same area could cumulatively result in a degraded fire barrier rating

  3. Program description for the qualification of CNEA - Argentina as a supplier of LEU silicide fuel and post-irradiation examinations plan for the first prototype irradiated in Argentina

    International Nuclear Information System (INIS)

    Rugirello, Gabriel; Adelfang, Pablo; Denis, Alicia; Zawerucha, Andres; Marco, Agustin di; Guillaume, Eduardo; Sbaffoni, Monica; Lacoste, Pablo

    1998-01-01

    In this report we present a description of the ongoing and future stages of the program for the qualification of CNEA, Argentina, as a supplier of low enriched uranium silicide fuel elements for research reactor. Particularly we will focus on the characteristics of the future irradiation experiment on a new detachable prototype, the post-irradiation examinations (PIE) plan for the already irradiated prototype PO4 and an overview of the recently implemented PIE facilities and equipment. The program is divided in several steps, some of which have been already completed. It concludes: development of the uranium silicide fissile material, irradiation and PIE of several full-scale prototypes. Important investments have been already carried out in the facilities for the FE production and PIE. (author)

  4. Risk D and D Rapid Prototype: Scenario Documentation and Analysis Tool

    International Nuclear Information System (INIS)

    Unwin, Stephen D.; Seiple, Timothy E.

    2009-01-01

    Report describes process and methodology associated with a rapid prototype tool for integrating project risk analysis and health and safety risk analysis for decontamination and decommissioning projects. The objective of the Decontamination and Decommissioning (D and D) Risk Management Evaluation and Work Sequencing Standardization Project under DOE EM-23 is to recommend or develop practical risk-management tools for decommissioning of nuclear facilities. PNNL has responsibility under this project for recommending or developing computer-based tools that facilitate the evaluation of risks in order to optimize the sequencing of D and D work. PNNL's approach is to adapt, augment, and integrate existing resources rather than to develop a new suite of tools. Methods for the evaluation of H and S risks associated with work in potentially hazardous environments are well-established. Several approaches exist which, collectively, are referred to as process hazard analysis (PHA). A PHA generally involves the systematic identification of accidents, exposures, and other adverse events associated with a given process or work flow. This identification process is usually achieved in a brainstorming environment or by other means of eliciting informed opinion. The likelihoods of adverse events (scenarios) and their associated consequence severities are estimated against pre-defined scales, based on which risk indices are then calculated. A similar process is encoded in various project risk software products that facilitate the quantification of schedule and cost risks associated with adverse scenarios. However, risk models do not generally capture both project risk and H and S risk. The intent of the project reported here is to produce a tool that facilitates the elicitation, characterization, and documentation of both project risk and H and S risk based on defined sequences of D and D activities. By considering alternative D and D sequences, comparison of the predicted risks can

  5. Prototype development and demonstration for response, emergency staging, communications, uniform management, and evacuation (R.E.S.C.U.M.E.) : R.E.S.C.U.M.E. prototype system design document.

    Science.gov (United States)

    2014-04-01

    This report documents the System Design Document (SDD) for the prototype development and demonstration of the : Response, Emergency Staging, Communications, Uniform Management, and Evacuation (R.E.S.C.U.M.E.) application : bundle, with a focus on the...

  6. NASAwide electronic publishing system-prototype STI electronic document distribution: Stage-4 evaluation report. Part 2; Appendices

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  7. Restart Plan for the Prototype Vertical Denitration Calciner [SD Coversheet has Incorrect Document Number

    Energy Technology Data Exchange (ETDEWEB)

    SUTTER, C.S.

    1999-07-26

    Testing activities on the Prototype Vertical Denitration Calciner at PFP were suspended in January 1997 due to the hold on fissile material handling in the facility. The Restart Plan will govern the transition of the test program from the completion of the activity based startup review; through equipment checkout and surrogate material runs; to resumption of the testing program and transition to unrestricted testing.

  8. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  9. Design and Analysis of the Korean Small Semi-prototype Mock-up for the 2nd Qualification of the ITER Blanket First Wall

    International Nuclear Information System (INIS)

    Lee, Dong Won; Kim, Suk Kwon; Yoon, Jae Sung; Lee, Eo Hwak; Lee, Seung Jae; Choi, Bo Guen; Park, Jeong Yong; Jung, Yang Il; Choi, Byung Kwon; Kim, Byoung Yoon

    2011-01-01

    Since the blanket First Wall (FW) of the International Thermonuclear Experimental Reactor (ITER) is subjected to a high heat and high neutron loads, it is one of the most important components. It composed of a beryllium (Be) layer as a plasma facing material, a copper alloy (CuCrZr) layer as a heat sink and type 316L authentic stainless steel (SS316L) as a structure material. The joining of the three different metals is the key issue to be solved. And more, the peak heat load was assumed to be 0.5 MW/m 2 in the initial design of the FW, but it was changed to be up to 5 MW/m 2 In Korea, the joining method has developed and it was proved through the several mock-up fabrication and high heat flux tests for confirming the joining integrity. Some of them were tested in the foreign facilities such as JEBIS at JAEA in Japan, TSEFEY at Efremov in Russia, and JUDITH at FZJ in Germany, and others were tested in our own facilities such as KoHLT-1 and -2. And finally, the 1 st , recently. Therefore, the FW panel design has been changed for enhancing the cooling and ITER Organization will provide the proposed design. Qualification was passed, in which two 80x80x3 Be/Cu/SS mock-ups were tested under 0.625 and 0.875 MW/m 2 heat fluxes for 12,000 cycles and then tested under 1.75 and 1.40 MW/m 2 Currently, the 2 heat fluxes for 1,000 cycles at FZJ and SNL, respectively. Currently, the 2 nd qualification program was started and the semi-prototype should be fabricated by the end of 2011 for testing under 5.0 MW/m 2 heat flux for certain number of cycles. In order to prepare the semi-prototype, several fabrication methods should be developed through the fabrication and test with the several mock-ups. In the present study, small Be mock-up was fabricated as the first step for the preparation. It was fabricated according to the designs considering the currently modified design of the FW. In the present paper, the fabrication objectives, methods, results and related tests were

  10. Experience of secondary cooling system modification at prototype fast breeder reactor MONJU (Translated document)

    International Nuclear Information System (INIS)

    Kisohara, Naoyuki; Sakamoto, Yoshihiko

    2010-09-01

    The prototype fast breeder reactor MONJU has been shut down since the secondary sodium leak accident that occurred in December 1995. After the accident, an investigation into the cause and a comprehensive safety review of the plant were conducted, and various countermeasures for sodium leak were examined. Modification work commenced in September 2005. Since sodium, a chemically active material, is used as coolant in MONJU, the modification work required work methods suitable for the handling of sodium. From this perspective, the use of a plastic bag when opening the sodium boundary, oxygen concentration control in a plastic bag, slightly-positive pressure control of cover gas in the systems, pressing and cutting with a roller cutter to prevent the incorporation of metal fillings, etc. were adopted, with careful consideration given to experience and findings from previous modification work at the experimental fast reactor JOYO and plants abroad. Owing to these work methods, the modification work proceeded close to schedule without incident. (author)

  11. Experimental conditions and monitoring items of the prototype repository project (PRP). Research document

    International Nuclear Information System (INIS)

    Sugita, Yutaka; Ito, Akira; Kawakami, Susumu

    2003-03-01

    Various experiments are ongoing in the underground research facility 'the Hard Rock Laboratory (HRL)' of SKB in Sweden for the geological disposal of the high-level radioactive waste. International joint project Prototype Repository Project (PRP) is one of the experiments in the HRL which has some engineered barrier systems and to study the coupled behavior happening in and around the engineered barrier system. JNC has joined this international joint project PRP to obtain the information of the coupled behavior on such systematic engineered barrier system and to apply the JNC's coupled THMC analytical code to the prediction and back analysis of the PRP. The analytical code will be verified through these analyses in this project. JNC can apply the verified analytical code to assess the coupled behavior in Japan. This report summarizes the experimental conditions and monitoring items of the PRP. (author)

  12. International review on safety requirements for the prototype fast breeder reactor “Monju” (Translated document)

    International Nuclear Information System (INIS)

    2016-02-01

    In response to the lessons learned from the serious nuclear accidents at the TEPCO's Fukushima Daiichi Nuclear Power Stations, an advisory committee, which was set up by the Japan Atomic Energy Agency, issued the report “Safety Requirements Expected to the Prototype Fast Breeder Reactor Monju” taking into account the SFR specific safety characteristics in July 2014. The report was reviewed by the leading international experts on SFR safety from five countries and one international organization in order to obtain independent and objective evaluation. The international review comments on each subsection were collected and compiled, and then a summary of results was derived through the discussion at the review meeting and individual feedbacks. As a result the basic concept for prevention of severe accidents and mitigation of their consequences of Monju is appropriate in consideration of SFR specific safety characteristics, and is in accordance with international common understanding. (author)

  13. Ultra-high vacuum qualification of the prototype module for the 2*3 km arms of the VIRGO interferometer

    CERN Document Server

    Brisson, V; Lissilour, G; Marin, P; Reboux, A; Bernardini, B; Pasqualetti, A

    2001-01-01

    The prototype for the series production of the 400 modules to be built by CNIM is first briefly described after the surface cleaning and 400 degrees C air firing. The systems for the 160 degrees C bake out, the pumping and measuring bench installed in the CNIM premises are then presented. The results on leak tightness, hydrogen outgassing and residual hydrocarbon contamination are reported and compared to the 20 degrees C VIRGO specifications. An additional test on hydrogen diffusion at 400 degrees C performed at CERN on a stainless-steel sample is reported. Our measurement of the hydrogen outgassing rate is discussed in relation with this test and also with regard to the oxide layer resulting from the air firing. (5 refs).

  14. Qualification criteria to certify a package for air transport of plutonium

    International Nuclear Information System (INIS)

    1977-12-01

    The document describes qualification criteria developed by the U.S. Nuclear Regulatory Commission to certify a package for air transport of plutonium. Included in the document is a discussion of aircraft accident conditions and a summary of the technical basis for the qualification criteria. The criteria require prototype packages to be subjected to various individual and sequential tests that simulate the conditions produced in severe aircraft accidents. Specific post-test acceptance standards are prescribed for each of the three safety functions of a package. The qualification criteria also prescribe certain operational controls to be exercised during transport

  15. Large Bore Powder Gun Qualification (U)

    Energy Technology Data Exchange (ETDEWEB)

    Rabern, Donald A. [Los Alamos National Laboratory; Valdiviez, Robert [Los Alamos National Laboratory

    2012-04-02

    A Large Bore Powder Gun (LBPG) is being designed to enable experimentalists to characterize material behavior outside the capabilities of the NNSS JASPER and LANL TA-55 PF-4 guns. The combination of these three guns will create a capability to conduct impact experiments over a wide range of pressures and shock profiles. The Large Bore Powder Gun will be fielded at the Nevada National Security Site (NNSS) U1a Complex. The Complex is nearly 1000 ft below ground with dedicated drifts for testing, instrumentation, and post-shot entombment. To ensure the reliability, safety, and performance of the LBPG, a qualification plan has been established and documented here. Requirements for the LBPG have been established and documented in WE-14-TR-0065 U A, Large Bore Powder Gun Customer Requirements. The document includes the requirements for the physics experiments, the gun and confinement systems, and operations at NNSS. A detailed description of the requirements is established in that document and is referred to and quoted throughout this document. Two Gun and Confinement Systems will be fielded. The Prototype Gun will be used primarily to characterize the gun and confinement performance and be the primary platform for qualification actions. This gun will also be used to investigate and qualify target and diagnostic modifications through the life of the program (U1a.104 Drift). An identical gun, the Physics Gun, will be fielded for confirmatory and Pu experiments (U1a.102D Drift). Both guns will be qualified for operation. The Gun and Confinement System design will be qualified through analysis, inspection, and testing using the Prototype Gun for the majority of process. The Physics Gun will be qualified through inspection and a limited number of qualification tests to ensure performance and behavior equivalent to the Prototype gun. Figure 1.1 shows the partial configuration of U1a and the locations of the Prototype and Physics Gun/Confinement Systems.

  16. Ministerial Decree of 1 March 1973. Approval of the models of documents concerning the professional qualifications for the management and operation of nuclear installations

    International Nuclear Information System (INIS)

    1973-01-01

    This Decree by the Ministry of Labour implements Section 36 of DPR No. 1450 of 30 December 1970 (Regulations concerning the qualifications for technical operation of nuclear installations) made under Act no. 1860. (NEA) [fr

  17. On safety 1E qualification of electrical equipment for nuclear power stations

    International Nuclear Information System (INIS)

    Segarceanu, D.; Geambasu, C.; Avramescu, M.

    1995-01-01

    Electrical equipment and systems for the emergency shutdown of a nuclear reactor are qualified according to safety class 1E. Methods of qualification meeting the requirements should be used, either individually or in combination include, type-test qualification, qualification by operating experience, qualification by analysis, combined qualification. These methods qualification principles, procedures and documents are discussed. (N.T.). 1 fig

  18. Protótipo de sistema de documentação em enfermagem no puerpério Documentation system prototype for postpartum nursing

    Directory of Open Access Journals (Sweden)

    Regina Célia Sales Santos Veríssimo

    2013-01-01

    Full Text Available OBJETIVO: Desenvolver protótipo de sistema de documentação em enfermagem no puerpério. MÉTODOS: Planejamento de software utilizou modelo baseado em orientação a objetos, que englobou: compreensão e definição do contexto e dos modos de utilização projeto de arquitetura do sistema, identificação dos principais objetos do sistema, desenvolvimento dos modelos do projeto, especificação das interfaces dos objetos. Foram utilizadas as linguagem Structured Query Language (SQL, MySQL e Hypertext Preprocessor (php. RESULTADOS: O protótipo apresenta os requisitos planejados, entre eles: uso da Classificação Internacional para a Prática de Enfermagem (CIPE® versão 1.0 como código de apoio para execução do processo de enfermagem; apresentação dos eixos da CIPE® versão 1.0 em ordem de uso; geração de relatórios sobre a prática de uso dos processos de enfermagem. CONCLUSÃO: O protótipo de sistema de documentação proposto foi desenvolvido com sucesso com possibilidade de registros de enfermagem por meio de linguagem padronizada.OBJECTIVE: To develop a documentation system prototype for postpartum nursing. METHODS: For the software planning, a model based on object orientation was used, which included: understanding and definition of the context and usage modes of the system design project, identification of the main objects of the system, development of project models, specification of object interfaces. The languages Structured Query Language (SQL, MySQL and Hypertext Preprocessor (php were used. RESULTS: The prototype shows the planned requirements, among them: use of the International Classification For Nursing Practice (ICNP® version 1.0 as support code to perform the nursing process; presentation of the axes of ICNP® version 1.0 in order of use; elaboration of reports about the usage practice of nursing processes. CONCLUSION: The proposed documentation system prototype was successfully developed, allowing professional

  19. Hybrid Qualifications

    DEFF Research Database (Denmark)

    Against the background of increasing qualification needs there is a growing awareness of the challenge to widen participation in processes of skill formation and competence development. At the same time, the issue of permeability between vocational education and training (VET) and general education...... has turned out as a major focus of European education and training policies and certainly is a crucial principle underlying the European Qualifications Framework (EQF). In this context, «hybrid qualifications» (HQ) may be seen as an interesting approach to tackle these challenges as they serve «two...

  20. Europeans come together on qualification

    International Nuclear Information System (INIS)

    Whittle, J.

    1996-01-01

    Utilities operating nuclear power plants in Europe have formed the European Network for Inspection Qualification (ENIQ) to produce a common approach to demonstrating that non-destructive testing is capable providing the information to ensure the absence of significant defects in nuclear plants. Major developments over recent months have included the issue by ENIQ of a formal document defining the methodology for the conduct of qualification which sets out the principles that detailed systems, within an individual country context, should embody. A pilot study on pipe welds typical of those in BWR recirculation loops is being conducted to explore the issues involved in the practical application of the methodology. In parallel with ENIQ, the European Nuclear Regulators Working Group has set up a Task Force in an attempt to define a common regulatory position on non-destructive testing qualifications and has produced its own document which is wider in scope than that of ENIQ. (UK)

  1. Nuclear energy electricity technical regulation on the qualification

    International Nuclear Information System (INIS)

    1995-01-01

    It tells the range of application purpose and of the qualification. It describes how to qualify of the class 1 E equipment, which are type test, operating experience, analysis and combined method. Next it deals with qualification procedure, which are specification requirement, requirement of qualification program, type testing, operating experience, analysis and combined qualification, acceptance criteria modification and extension with qualified life, simulated test profiles and document about type test data, operating experience data and extrapolation.

  2. Architectural prototyping

    DEFF Research Database (Denmark)

    Bardram, Jakob Eyvind; Christensen, Henrik Bærbak; Hansen, Klaus Marius

    2004-01-01

    A major part of software architecture design is learning how specific architectural designs balance the concerns of stakeholders. We explore the notion of "architectural prototypes", correspondingly architectural prototyping, as a means of using executable prototypes to investigate stakeholders...

  3. Qualification of ISI for Bulgarian NPP: UK support

    International Nuclear Information System (INIS)

    Booler, R.

    2000-01-01

    UK Regulator (NII) Phare project provides an assistance to the Bulgarian Regulator in setting up the technical infrastructure for inspection qualification consistent with IAEA Guidelines and western European practice. The Strategy Document defines the methodology for inspection qualification and general roles and responsibilities of the involved organizations. The Qualification Inputs Document describes the information required for the Technical Specifications (component details, inspection aims and limitations). It applies the idea of qualification level - level 1(lowest) to level 3 (highest). The Qualification Procedure Document provides a guidance to the utility ('Kozloduy' NPP) on the preparation of Qualification Procedures (QP). The appendix provides a specific guidance on the performance of the all aspects of qualification at different levels and recommendations for technical justification. QB Method Working Document provides guidance for the Qualification Body. Facilities and Resources Document defines the facilities and resources required for the Qualification Body to perform the tasks described in the Method Working Document. High level QA Document defines the principles of quality control. Other issues and progress report are also presented

  4. Nuclear Criticality Safety Department Qualification Program

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1996-01-01

    The Nuclear Criticality Safety Department (NCSD) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSD technical and managerial qualification as required by the Y-1 2 Training Implementation Matrix (TIM). This Qualification Program is in compliance with DOE Order 5480.20A and applicable Lockheed Martin Energy Systems, Inc. (LMES) and Y-1 2 Plant procedures. It is implemented through a combination of WES plant-wide training courses and professional nuclear criticality safety training provided within the department. This document supersedes Y/DD-694, Revision 2, 2/27/96, Qualification Program, Nuclear Criticality Safety Department There are no backfit requirements associated with revisions to this document

  5. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  6. LTP fibre injector qualification and status

    International Nuclear Information System (INIS)

    Bogenstahl, J; Cunningham, L; Fitzsimons, E D; Hough, J; Killow, C J; Perreur-Lloyd, M; Robertson, D; Rowan, S; Ward, H

    2009-01-01

    This paper presents the current state of the LISA Technology Package (LTP) fibre injector qualification project in terms of vibration and shock tests. The fibre injector is a custom built part and therefore must undergo a full space qualification process. The mounting structure and method for sinusoidal vibration and random vibration tests as well as shock tests will be presented. Furthermore a proposal will be presented to use the fibre injector pair qualification model to build an optical prototype bench. The optical prototype bench is a full-scale model of the flight model. It will be used for development and rehearsal of all the assembly stages of the flight model and will provide an on-ground simulator for investigation as an updated engineering model.

  7. TOUGH2 software qualification

    International Nuclear Information System (INIS)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM (open-quotes MULti-KOMponentclose quotes) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2

  8. TOUGH2 software qualification

    Energy Technology Data Exchange (ETDEWEB)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM ({open_quotes}MULti-KOMponent{close_quotes}) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2.

  9. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  10. Collaborative Prototyping

    DEFF Research Database (Denmark)

    Bogers, Marcel; Horst, Willem

    2014-01-01

    of the prototyping process, the actual prototype was used as a tool for communication or development, thus serving as a platform for the cross-fertilization of knowledge. In this way, collaborative prototyping leads to a better balance between functionality and usability; it translates usability problems into design......This paper presents an inductive study that shows how collaborative prototyping across functional, hierarchical, and organizational boundaries can improve the overall prototyping process. Our combined action research and case study approach provides new insights into how collaborative prototyping...... can provide a platform for prototype-driven problem solving in early new product development (NPD). Our findings have important implications for how to facilitate multistakeholder collaboration in prototyping and problem solving, and more generally for how to organize collaborative and open innovation...

  11. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    International Nuclear Information System (INIS)

    Mitteau, Raphaël; Eaton, R.; Perez, G.; Zacchia, F.; Banetta, S.; Bellin, B.; Gervash, A.; Glazunov, D.; Chen, J.

    2015-01-01

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  12. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    Energy Technology Data Exchange (ETDEWEB)

    Mitteau, Raphaël, E-mail: Raphael.mitteau@iter.org [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Eaton, R.; Perez, G. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Zacchia, F.; Banetta, S.; Bellin, B. [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Gervash, A.; Glazunov, D. [Efremov Research Institute, 189631 St. Petersburg (Russian Federation); Chen, J. [Southwestern Institute of Physics, Huangjing Road, Chengdu 610225 (China)

    2015-10-15

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  13. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  14. Prototyping Practice

    DEFF Research Database (Denmark)

    Ramsgaard Thomsen, Mette; Tamke, Martin

    2015-01-01

    This paper examines the role of the prototyping in digital architecture. During the past decade, a new research field has emerged exploring the digital technology’s impact on the way we think, design and build our environment. In this practice the prototype, the pavilion, installation or demonstr......This paper examines the role of the prototyping in digital architecture. During the past decade, a new research field has emerged exploring the digital technology’s impact on the way we think, design and build our environment. In this practice the prototype, the pavilion, installation...

  15. 27 CFR 19.823 - Changes after original qualification.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Changes after original... Vaporizing Process Qualification Documents § 19.823 Changes after original qualification. When there is a change in the information recorded in the original approved application, the proprietor shall make a...

  16. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sarkimo, M. [VTT Technical Research Centre of Finland, Espoo (Finland); Pitkaenen, J.

    2013-12-15

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  17. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    International Nuclear Information System (INIS)

    Sarkimo, M.; Pitkaenen, J.

    2013-12-01

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  18. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  19. Safety design guides for environmental qualification for CANDU 9

    International Nuclear Information System (INIS)

    Lee, Duk Su; Chang, Woo Hyun; Lee, Nam Young; A. C. D. Wright

    1996-03-01

    This safety design guide describes the safety philosophy and requirements for the environmental qualification of safety related systems and components for CANDU 9. The environmental qualification program identifies the equipments to be qualified and conditions to be used for qualification and provides comprehensive set of documentation to ensure that the qualification is complete and can be maintained for the life of the plant. A summary of the system, components and structures requiring environmental qualification is provided in the table for the guidance of the system design, and this table will be subject to change or confirmation by the environmental qualification program. Also, plant ares subject to harsh environment is provided in the figure. The change status of the regulatory requirements, code and standards should be traced and this safety design guide shall be updated accordingly. 1 tab., 5 figs. (Author) .new

  20. AGR-1 Data Qualification Report

    International Nuclear Information System (INIS)

    Abbott, Michael

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office (TDO) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor experiment (AGR-1), the processing of these data within NDMAS, and reports the qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. They include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent quality assurance program. The NDMAS database processing and qualification status of the following five data streams is reported in this document: (1) Fuel fabrication data. All data have been processed into the NDMAS database and qualified (1,819 records). (2) Fuel irradiation data. Data from all 13 AGR-1 reactor cycles have been processed into the NDMAS database and tested. Of these, 85% have been qualified and 15% have failed NDMAS accuracy testing. (3) FPMS data. Reprocessed (January 2010) data from all 13 AGR-1 reactor cycles have been processed into the database and capture tested. Final qualification of these data will be recorded after QA approval of an Engineering Calculations and Analysis Report currently

  1. Unikabeton Prototype

    DEFF Research Database (Denmark)

    Søndergaard, Asbjørn; Dombernowsky, Per

    2011-01-01

    The Unikabeton prototype structure was developed as the finalization of the cross-disciplinary research project Unikabeton, exploring the architectural potential in linking the computational process of topology optimisation with robot fabrication of concrete casting moulds. The project was elabor......The Unikabeton prototype structure was developed as the finalization of the cross-disciplinary research project Unikabeton, exploring the architectural potential in linking the computational process of topology optimisation with robot fabrication of concrete casting moulds. The project...... of Architecture was to develop a series of optimisation experiments, concluding in the design and optimisation of a full scale prototype concrete structure....

  2. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  3. Inspection procedure and essential parameters in NDT qualification

    International Nuclear Information System (INIS)

    Sarkimo, M.

    2000-06-01

    The objective of the inspection qualification is to ensure that applied non-destructive methods (NDT) have the required performance. The approach of the qualification process is systematic and carefully documented and therefore some new requirements can be seen concerning the composition of the documentation. There are also new document types, that only application of the inspection qualification requires. The most important of these is the technical justification, that includes the documented evidences concerning the performance of the inspection system. This publication includes two reports: 'Compilation of the inspection procedure' and 'Essential/influential parameters in NDT qualification'. The former of these discusses the issues to be considered in an inspection procedure especially from the point of view of the mechanised ultrasonic testing. The later report explains the parameters formulated to analyse in the technical justification all aspects of the inspection application. (orig.)

  4. Solution Prototype

    DEFF Research Database (Denmark)

    Efeoglu, Arkin; Møller, Charles; Serie, Michel

    2013-01-01

    This paper outlines an artifact building and evaluation proposal. Design Science Research (DSR) studies usually consider encapsulated artifact that have relationships with other artifacts. The solution prototype as a composed artifact demands for a more comprehensive consideration in its systematic...... environment. The solution prototype that is composed from blending product and service prototype has particular impacts on the dualism of DSR’s “Build” and “Evaluate”. Since the mix between product and service prototyping can be varied, there is a demand for a more agile and iterative framework. Van de Ven......’s research framework seems to fit this purpose. Van de Ven allows for an iterative research approach to problem solving with flexible starting point. The research activity is the result between the iteration of two dimensions. This framework focuses on the natural evaluation, particularly on ex...

  5. Commercial Parts Technology Qualification Processes

    Science.gov (United States)

    Cooper, Mark S.

    2013-01-01

    Many high-reliability systems, including space systems, use selected commercial parts (including Plastic Encapsulated Microelectronics or PEMs) for unique functionality, small size, low weight, high mechanical shock resistance, and other factors. Predominantly this usage is subjected to certain 100% tests (typically called screens) and certain destructive tests usually (but not always) performed on the flight lot (typically called qualification tests). Frequently used approaches include those documented in EEE-INST-002 and JPL DocID62212 (which are sometimes modified by the particular aerospace space systems manufacturer). In this study, approaches from these documents and several space systems manufacturers are compared to approaches from a launch systems manufacturer (SpaceX), an implantable medical electronics manufacturer (Medtronics), and a high-reliability transport system process (automotive systems). In the conclusions section, these processes are outlined for all of these cases and presented in tabular form. Then some simple comparisons are made. In this introduction section, the PEM technology qualification process is described, as documented in EEE-INST-002 (written by the Goddard Space Flight Center, GSFC), as well as the somewhat modified approach employed at the Jet Propulsion Laboratory (JPL). Approaches used at several major NASA contractors are also described

  6. Software Prototyping

    Science.gov (United States)

    Del Fiol, Guilherme; Hanseler, Haley; Crouch, Barbara Insley; Cummins, Mollie R.

    2016-01-01

    Summary Background Health information exchange (HIE) between Poison Control Centers (PCCs) and Emergency Departments (EDs) could improve care of poisoned patients. However, PCC information systems are not designed to facilitate HIE with EDs; therefore, we are developing specialized software to support HIE within the normal workflow of the PCC using user-centered design and rapid prototyping. Objective To describe the design of an HIE dashboard and the refinement of user requirements through rapid prototyping. Methods Using previously elicited user requirements, we designed low-fidelity sketches of designs on paper with iterative refinement. Next, we designed an interactive high-fidelity prototype and conducted scenario-based usability tests with end users. Users were asked to think aloud while accomplishing tasks related to a case vignette. After testing, the users provided feedback and evaluated the prototype using the System Usability Scale (SUS). Results Survey results from three users provided useful feedback that was then incorporated into the design. After achieving a stable design, we used the prototype itself as the specification for development of the actual software. Benefits of prototyping included having 1) subject-matter experts heavily involved with the design; 2) flexibility to make rapid changes, 3) the ability to minimize software development efforts early in the design stage; 4) rapid finalization of requirements; 5) early visualization of designs; 6) and a powerful vehicle for communication of the design to the programmers. Challenges included 1) time and effort to develop the prototypes and case scenarios; 2) no simulation of system performance; 3) not having all proposed functionality available in the final product; and 4) missing needed data elements in the PCC information system. PMID:27081404

  7. Inspector qualification guidelines

    International Nuclear Information System (INIS)

    Batty, A.C.; Van Binnebeek, J.J.; Ericsson, P.O.; Fisher, J.C.; Geiger, P.; Grandame, M.; Grimes, B.K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-01

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied

  8. Inspector qualification guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Batty, A. C.; Van Binnebeek, J. J.; Ericsson, P. O.; Fisher, J. C.; Geiger, P.; Grandame, M.; Grimes, B. K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-15

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied.

  9. Qualification tests of materials for spallation neutron sources

    International Nuclear Information System (INIS)

    Sommer, W.F.; Maloy, S.; Wechsler, M.S.

    1997-01-01

    Several laboratories will take part in an extensive materials qualification program that includes irradiation in the proton beam and neutron field available at the Los Alamos Spallation Radiation Damage Facility (LASREF). A number of candidate materials will be exposed to prototypic spallation producing particle radiation. Studies of corrosion-related phenomena and the mitigation of these effects will also be accomplished

  10. Radiological Control Technician: Standardized technician Qualification Standard

    International Nuclear Information System (INIS)

    1992-10-01

    The Qualification Standard states and defines the knowledge and skill requirements necessary for successful completion of the Radiological Control Technician Training Program. The standard is divided into three phases: Phase I concerns RCT Academic training. There are 13 lessons associated with the core academics program and 19 lessons associated with the site academics program. The staff member should sign the appropriate blocks upon successful completion of the examination for that lesson or group of lessons. In addition, facility specific lesson plans may be added to meet the knowledge requirements in the Job Performance Measures (JPM) of the practical program. Phase II concerns RCT core/site practical (JPMs) training. There are thirteen generic tasks associated with the core practical program. Both the trainer/evaluator and student should sign the appropriate block upon successful completion of the JPM. In addition, facility specific tasks may be added or generic tasks deleted based on the results of the facility job evaluation. Phase III concerns the oral examination board successful completion of the oral examination board is documented by the signature of the chairperson of the board. Upon completion of all of the standardized technician qualification requirements, final qualification is verified by the student and the manager of the Radiological Control Department and acknowledged by signatures on the qualification standard. The completed Qualification Standard shall be maintained as an official training record

  11. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

      When, in a competitive sphere, people are selected on the basis of qualifications only, their chances of acquiring positions of advantage may seem to depend entirely upon their abilities, not discriminatory bias. However, if reaction qualifications - i.e. characteristics which contribute...... to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... of merit. Specifically, it preserves symmetry between negative evaluations of antimeritocratic bases of selection and negative evaluations of qualifications rooted in comparable antimeritocratic reactions. So if employers should not select among applicants on the basis of their (the employers') racial...

  12. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  13. Inspection qualification and implementation of ENIQ in Sweden

    International Nuclear Information System (INIS)

    Zettervall, Tommy

    2013-01-01

    Many countries are currently considering their approaches to inspection qualification and risk-informed in-service inspection (RI-ISI) and are carefully assessing experience data. In Europe most of the utilities operating nuclear power plants have joined together to form the European Network for Inspection Qualification ENIQ. In practice, qualification can be performed with varying degrees of complexity and cost, varying from capability statement based on existing evidence, through to an extensive qualification consisting of a detailed Technical Justification (TJ) together with open and blind trials on full-scale test blocks. An Inspection Qualification is an investigation and demonstration, which confirm that an inspection system has the ability to solve its specific tasks. The qualification is a Quality Assurance of an inspection system based on documents and practical trials. A reliable inspection system, based on a reliable qualification and correct prerequisites, will reduce total costs for Licensees and increase the credibility of the inspection result. To get such inspection system, which could be valid for many years, it's of necessity to fulfil all included parts in the process. It begins with the Technical Specification from Licensee, where input data and requirements about the actual component are specified. To get an inspection system that could live over time, the Technical Justification is of importance. Finally the test blocks and used simulation techniques play an important part of the final result, and these test blocks together with TJ form the basis for qualification body's decision. (author)

  14. Software qualification in safety applications

    International Nuclear Information System (INIS)

    Lawrence, J.D.

    2000-01-01

    The developers of safety-critical instrumentation and control systems must qualify the design of the components used, including the software in the embedded computer systems, in order to ensure that the component can be trusted to perform its safety function under the full range of operating conditions. There are well known ways to qualify analog systems using the facts that: (1) they are built from standard modules with known properties; (2) design documents are available and described in a well understood language; (3) the performance of the component is constrained by physics; and (4) physics models exist to predict the performance. These properties are not generally available for qualifying software, and one must fall back on extensive testing and qualification of the design process. Neither of these is completely satisfactory. The research reported here is exploring an alternative approach that is intended to permit qualification for an important subset of instrumentation software. The research goal is to determine if a combination of static analysis and limited testing can be used to qualify a class of simple, but practical, computer-based instrumentation components for safety application. These components are of roughly the complexity of a motion detector alarm controller. This goal is accomplished by identifying design constraints that enable meaningful analysis and testing. Once such design constraints are identified, digital systems can be designed to allow for analysis and testing, or existing systems may be tested for conformance to the design constraints as a first step in a qualification process. This will considerably reduce the cost and monetary risk involved in qualifying commercial components for safety-critical service

  15. Courthouse Prototype Building

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2018-02-01

    As part of DOE's support of ANSI/ASHRAE/IES Standard 90.1 and IECC, researchers at Pacific Northwest National Laboratory (PNNL) apply a suite of prototype buildings covering 80% of the commercial building floor area in the U.S. for new construction. Efforts have started on expanding the prototype building suite to cover 90% of the commercial building floor area in the U.S., by developing prototype models for additional building types including place of worship, public order and safety, public assembly. Courthouse is courthouse is a sub-category under the “Public Order and Safety" building type category; other sub-categories include police station, fire station, and jail, reformatory or penitentiary.ORNL used building design guides, databases, and documented courthouse projects, supplemented by personal communication with courthouse facility planning and design experts, to systematically conduct research on the courthouse building and system characteristics. This report documents the research conducted for the courthouse building type and proposes building and system characteristics for developing a prototype building energy model to be included in the Commercial Building Prototype Model suite. According to the 2012 CBECS, courthouses occupy a total of 436 million sqft of floor space or 0.5% of the total floor space in all commercial buildings in the US, next to fast food (0.35%), grocery store or food market (0.88%), and restaurant or cafeteria (1.2%) building types currently included in the Commercial Prototype Building Model suite. Considering aggregated average, courthouse falls among the larger with a mean floor area of 69,400 sqft smaller fuel consumption intensity building types and an average of 94.7 kBtu/sqft compared to 77.8 kBtu/sqft for office and 80 kBtu/sqft for all commercial buildings.Courthouses range in size from 1000 sqft to over a million square foot building gross square feet and 1 courtroom to over 100 courtrooms. Small courthouses

  16. Nuclear power plants. Electrical equipment of the safety system. Qualification

    International Nuclear Information System (INIS)

    2001-01-01

    This International Standard applies to electrical parts of safety systems employed at nuclear power plants, including components and equipment of any interface whose failure could affect unfavourably properties of the safety system. The standard also applies to non-electrical safety-related interfaces. Furthermore, the standard describes the generic process of qualification certification procedures and methods of qualification testing and related documentation. (P.A.)

  17. Qualification of contractor/consultant instructors

    International Nuclear Information System (INIS)

    Hanson, H.D.

    1985-01-01

    Following a brief discussion of the role of consultant instructors in Public Service Electric and Gas Company's training organization, the qualification process is presented. Consultant instructors are provided with information regarding supervision of the trainees and the instructional process and procedures required. Each individual must have his or her instructional capability, supervisory skills and technical competence verified and documented prior to conducting training independently. Concluding comments describe the overall satisfactory experience with this program

  18. AGR-2 Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Michael L. Abbott

    2010-09-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  19. AGR-2 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Michael L.

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  20. Software qualification of selected TOUGH2 modules

    International Nuclear Information System (INIS)

    Wu, Y.S.; Ahlers, C.F.; Fraser, P.; Simmons, A.; Pruess, K.

    1996-10-01

    The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of the single-phase Gas (EOS1G), Effective Continuum Method (ECM), Saturated/Unsaturated Flow (EOS9), and Radionuclide Transport (T2R3D) modules of TOUGH2, a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. This report contains the following sections: (1) Requirements Specification, (2) Design Description, (3) Software Validation Test Plan and Report, (4) Software User Documentation, and (5) Appendices. These sections comprise sequential parts of the Software Life Cycle, and are not intended to stand alone but should be used in conjunction with the TOUGH User's Guide (Pruess, 1987), TOUGH2--A General Purpose Numerical Simulator for Multiphase Fluid and Heat Flow (Pruess, 1991), and the above-referenced TOUGH2 software qualification document. The qualification package is complete with the attached Software Identification Form and executable source code for the single-phase Gas, Effective Continuum method, Saturated/Unsaturated Flow, and Radionuclide Transport modules of TOUGH2

  1. Buried Waste Program (BWP) data qualification manual

    International Nuclear Information System (INIS)

    Casey, C.; Larson, R.A.; Harris, G.A.

    1989-06-01

    The Data Qualification Manual (DQM) has been developed to discuss the process required to qualify data generated for the Buried Waste Program (BWP). The data from the BWP tasks conducted at the Radioactive Waste Management Complex (RWMC) and elsewhere will lead to remedial decisions being made which are governed by federal regulations administered by the Environmental Protection Agency (EPA). Data qualification is the process of insuring that only data of planned and known qualities are used to make a decision or answer a question. Although it is the Data Integrity Review Committee's (DIRC) responsibility to insure that the quality of all BWP data is ultimately verified and validated, all personnel who participate in the data gathering process will affect the quality of the data and must be responsible for knowing what is required to produce data of the planned quality. Therefore this manual is addressed to all participants in a data-gathering task. This manual discusses requirements to support data qualification in several areas, including: the sampling and analysis plan; data quality objectives and PARCC goals; sample custody documentation; quality assurance; assembly of the data qualification package; and existing data. 23 refs., 4 figs., 6 tabs

  2. Nightshade Prototype Experiments (Silverleaf)

    Energy Technology Data Exchange (ETDEWEB)

    Danielson, Jeremy [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bauer, Amy L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-23

    The Red Sage campaign is a series of subcritical dynamic plutonium experiments designed to measure ejecta. Nightshade, the first experiments in Red Sage scheduled for fiscal year 2019, will measure the amount of ejecta emission into vacuum from a double-­shocked plutonium surface. To address the major technical risks in Nightshade, a Level 2 milestone was developed for fiscal year 2016. Silverleaf, a series of four experiments, was executed at the Los Alamos National Laboratory in July and August 2016 to demonstrate a prototype of the Nightshade package and to satisfy this Level 2 milestone. This report is documentation that Red Sage Level 2 milestone requirements were successfully met.

  3. Qualification test on class 1E charger and inverter in nuclear power plant

    International Nuclear Information System (INIS)

    Li Mingcheng; Lin Jian; Fu Mingxing; Xu Benfu; Ma Peifeng

    2014-01-01

    The qualification approach for class lE electrical equipment was introduced, based on IEC, IEEE and RCC-E standards and technical documents. Combined with a lot of practical experience, the qualification scheme for class lE charger and inverter was developed. The component evaluation, performance and stress test, EMC test, seismic test and software qualification for the equipment were analyzed in detail. (authors)

  4. The implementing of the training, examination and qualification for QA auditor

    International Nuclear Information System (INIS)

    Ma Xiaozheng; Han Peicong; Zhang Zhongyuan; Zhu Guoliang

    2007-01-01

    China Power Investment Corporation has implemented the training, examination and qualification for QA auditor based on the related requirements of the nuclear safety documents. The bases, planning of the procedure, implementing procedure and suggestions for implementing the training, examination and qualification are described in this article. That can be used as the reference for implementing the training, examination and qualification for QA auditor, as well as for establishment of the related guide. (authors)

  5. Prototype development and demonstration for integrated dynamic transit operations.

    Science.gov (United States)

    2016-01-01

    This document serves as the Final Report specific to the Integrated Dynamic Transit Operations (IDTO) Prototype Development and Deployment Project, hereafter referred to as IDTO Prototype Deployment or IDTO PD project. This project was performed unde...

  6. Evaluation of a prototype infrasound system

    International Nuclear Information System (INIS)

    Whitaker, R.; Sandoval, T.; Breding, D.; Kromer, D.

    1997-01-01

    Under Department of Energy sponsorship, Sandia National Laboratories and Los Alamos National Laboratory cooperated to develop a prototype infrasonic array, with associated documentation, that could be used as part of the International Monitoring System. The United States Government or foreign countries could procure commercially available systems based on this prototype to fulfill their Comprehensive Test Ban Treaty (CTBT) obligations. The prototype is a four-element array in a triangular layout as recommended in CD/NTB/WP.224 with an element at each corner and one in the center. The prototype test configuration utilize an array spacing of 1 km. The prototype infrasound system has the following objectives: (1) Provide a prototype that reliably acquires and transmits near real-time infrasonic data to facilitate the rapid location and identification of atmospheric events. (2) Provide documentation that could be used by the United States and foreign countries to procure infrasound systems commercially to fulfill their CTBT responsibilities. Infrasonic monitoring is an effective, low cost technology for detecting atmospheric explosions. The low frequency components of explosion signals propagate to long ranges (few thousand kilometers) where they can be detected with an array of sensors. Los Alamos National Laboratory's expertise in infrasound systems and phenomenology when combined with Sandia's expertise in providing verification quality system for treaty monitoring make an excellent team to provide the prototype infrasound sensor system. By September 1997, the prototype infrasound system will have been procured, integrated, evaluated and documented. Final documentation will include a system requirements document, an evaluation report and a hardware design document. The hardware design document will describe the various hardware components used in the infrasound prototype and their interrelationships

  7. Ageing management and equipment qualification

    International Nuclear Information System (INIS)

    Stahl, Gunnar

    2014-01-01

    The knowledge of how the environment and load of organic material in general and especially polymers and lubricants, is affecting the degradation of important properties, have increased during the last decade. However the restrictions using established additives like some color pigments due to their poisonousness e.g. pigments based at cadmium, lead, mercury etc. have caused problems when replacing additives to polymers. The replacement additives have often been used in new design without going through the required material qualification procedure. There have also been observed that some non-qualified and non-approved materials have been installed in some power plants due to false documentation. There are also a lot of new manufacturers, of materials similar to the previously qualified materials, active at the market. This increases the difficulty to ensure that the required material quality is used. New materials, new additives and new manufacturers makes if more and more difficult to assure that the expected material is present. This causes more strict demands of how the new materials often used in equipment at type-testing and in replacement materials are analyzed and documented. By implementing new steps for chemical, mechanical and electrical analysis and increase the general quality assurance content this issue can be managed. (authors)

  8. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  9. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

    to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... preferences, recipients should not respond to the applicant actually hired on the basis of their (the recipients') racial preferences. My account decomposes the meritocratic ideal into four separate norms, one of which applies to recipients rather than to selectors. Finally, it defends the view that reaction...... qualifications based on antimeritocratic reactions, while not unproblematic, are not entirely irrelevant from the point of view of merit. Notably, selectors need not discount them when no one - including the targets of the objectionable preferences - is unfairly disadvantaged. Because not all problematic...

  10. Qualification of conditioning process

    International Nuclear Information System (INIS)

    Wolf, J.

    1989-01-01

    A conditioning process is qualified by the PTB if the execution of pre-treatment and conditioning occurs so that a safe and orderly final storage of the products and waste containers produced can be assumed. All the relevant operating conditions for the plant are laid down by the producer/conditioner of the waste in a handbook. The elements of product inspection by process qualification are shown in tabular form. (DG) [de

  11. REGULATION OF NATIONAL QUALIFICATIONS SYSTEMS

    Directory of Open Access Journals (Sweden)

    Anna A. Muravyeva

    2014-01-01

    Full Text Available The paper looks into the diverse aspects of qualifications system regulation, designed for balancing the supply and demand in the labor and educational service markets. Both the objects and mechanisms of such regulation are described. Special attention is given to institutions, involved in regulation of qualifications, and their jurisdiction. Another emphasis is on the industry-related regulation of qualifications which proved to be effective both on the national and European level. Such structures were first established on the national levels to regulate the qualifications and ensure their comparability and compatibility, given the economic globalization and growing labor and academic mobility. The author points out the role of the ministries of education and labor in maintaining a steady qualifications system, and outlines the positive experience of Great Britain using the industry councils for continuing development of qualifications system.

  12. Impact of the draft DOE Training and Qualification Standard on an established training and qualification program

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1999-01-01

    One of the provisions of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 97-2 was that the US Department of Energy (DOE) hor e llipsis Develop and institute ahor e llipsiscourse in criticality and criticality safety hor e llipsis to serve as the foundation for a program of formal qualification of criticality engineers. In response, a draft DOE standard establishing requirements for a formal qualification program for nuclear criticality safety (NCS) engineers has been prepared and is currently in review. The Oak Ridge Y-12 plant implemented a formal training and qualification program for NCS engineers in 1995. The program complies with existing DOE requirements. The program was developed using a performance-based systematic approach to training and is accomplished through structured mentoring where experienced personnel interact with candidates through various learning exercises. Self-study, exercises, and work under instruction are all utilized. The candidate's performance is evaluated by mentors and oral boards. Competency gained through experience at other sites can also be credited. Technical portions of the program are primarily contained in an initial Engineer-in-Training segment and in subsequent task-specific qualifications. The Engineer-in-Training segment exposes the candidate to fundamental NCS concepts through example problems; ensures the initial compliance training requirements are met; and includes readings from applicable procedures, technical documents, and standards. Upon completion of this initial training, candidates proceed to task qualifications. Tasks are defined NCS activities such as operational reviews, criticality safety evaluations, criticality safety computations, criticality accident alarm system (CAAS) evaluations, support for emergency management, etc. Qualification on a task basis serves to break up training into manageable pieces and expedites qualification of candidates to perform specific production activities. The

  13. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  14. Training for the qualification and competence of nuclear power plant personnel. Working material

    International Nuclear Information System (INIS)

    1993-01-01

    This document contains summaries of the presentations prepared for the IAEA Review Meeting ''Training for the Qualification and Competence of Nuclear Power Plant Personnel''. The individual contributors have been indexed separately for the database. Refs, figs and tabs

  15. Mechanical properties used for the qualification of transport casks

    International Nuclear Information System (INIS)

    Salzbrenner, R.; Crenshaw, T.B.; Sorenson, K.B.

    1993-01-01

    The qualification process that should be sufficient for qualification of a specific cask (material/geometry combination) has been examined. The prototype cask should be tested to determine its overall variation in microstructure, chemistry, and mechanical properties. This prototype may also be subjected to 'proof testing' to demonstrate the validity of the design analysis (including the mechanical properties used in the analysis). The complete mechanical property mapping does not necessarily have to precede the proof testing (i.e., portions of the cask which experience only low (elastic) loads during the drop test are suitable for mechanical test specimens). The behavior of the prototype cask and the production casks are linked by assuring that each cask possesses at least the minimum level of one or more critical mechanical properties. This may be done by measuring the properties of interest directly, or by relying on a secondary measurement (such as subsize mechanical test results or microstructure/compositional measurements) which has been statistically correlated to the critical properties. The database required to show the correlation between the secondary measurement and the valid design property may be established by tests on the material from the prototype cask. The production controls must be demonstrated as being adequate to assure that a uniform product is produced. The testing of coring (or test block or prolongation) samples can only be viewed as providing a valid link to the benchmark results provided by the prototype cask if the process used to create follow-on casks remains essentially similar. The MOSAIK Test Program has demonstrated the qualification method through the benchmarking stage. The program did not establish for qualifying serial production casks through, for example, a correlation between small specimen parameters and valid design fracture toughness properties. Such a correlation would require additional experimental work. (J.P.N.)

  16. Qualification of RETRAN for simulator applications

    International Nuclear Information System (INIS)

    Harrison, J.F.

    1988-01-01

    The use of full-scope control room replica simulators increased substantially following the accident at Three Mile Island Unit 2. The technical capability required to represent severe events has been included, in varying degrees, in most simulators purchased since the TMI-2 accident. The ability of the instructor to create a large variety of combinations of malfunctions has also greatly expanded. The nuclear industry has developed a standard which establishes the minimum functional requirements for full-scope nuclear control room simulators used for operator training. This standard, ANSI/ANS-3.5, was first issued in 1981 and was reissued in 1985. A method for performing simulator qualification with best estimate analytical data has been proposed in EPRI NP-4243, Analytic Simulator Qualification Methodology. The idea presented there is to choose a set of transients which drive the simulator into all the system conditions (dynamic states) likely to be encountered during operator training. The key observable parameters for each state are compared to analyses performed with the best estimate analytical model The closeness of the comparison determines the fidelity of the simulator. The approach described in EPRI NP-4243 has been adapted for evaluating RETRAN's capability for use in simulator qualification. RETRAN analyses which compare the RETRAN results to plant or test facility data are evaluated with respect to the simulator test matrix documented in EPRI NP-4243

  17. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  18. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 1 of Volume IV, discusses: Process overview functional descriptions; Control system descriptions; Support system descriptions; Maintenance system descriptions; and Process equipment descriptions

  19. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 4 of Volume IV, discusses: Off-normal operating and recovery procedures; Emergency response procedures; Troubleshooting procedures; and Preventive maintenance procedures

  20. Application of Microprocessor-Based Equipment in Nuclear Power Plants - Technical Basis for a Qualification Methodology

    International Nuclear Information System (INIS)

    Korsah, K.

    2001-01-01

    This document (1) summarizes the most significant findings of the ''Qualification of Advanced Instrumentation and Control (I and C) Systems'' program initiated by the Nuclear Regulatory Commission (NRC); (2) documents a comparative analysis of U.S. and European qualification standards; and (3) provides recommendations for enhancing regulatory guidance for environmental qualification of microprocessor-based safety-related systems. Safety-related I and C system upgrades of present-day nuclear power plants, as well as I and C systems of Advanced Light-Water Reactors (ALWRs), are expected to make increasing use of microprocessor-based technology. The Nuclear Regulatory Commission (NRC) recognized that the use of such technology may pose environmental qualification challenges different from current, analog-based I and C systems. Hence, it initiated the ''Qualification of Advanced Instrumentation and Control Systems'' program. The objectives of this confirmatory research project are to (1) identify any unique environmental-stress-related failure modes posed by digital technologies and their potential impact on the safety systems and (2) develop the technical basis for regulatory guidance using these findings. Previous findings from this study have been documented in several technical reports. This final report in the series documents a comparative analysis of two environmental qualification standards--Institute of Electrical and Electronics Engineers (IEEE) Std 323-1983 and International Electrotechnical Commission (IEC) 60780 (1998)--and provides recommendations for environmental qualification of microprocessor-based systems based on this analysis as well as on the findings documented in the previous reports. The two standards were chosen for this analysis because IEEE 323 is the standard used in the U.S. for the qualification of safety-related equipment in nuclear power plants, and IEC 60780 is its European counterpart. In addition, the IEC document was published in

  1. Environmental Qualification Program for NPP Krsko

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Spalj, S.; Colovic, G.

    1998-01-01

    The functionality the equipment important to safety is deteriorated during its service due to ageing and harsh environment conditions. Since the environment is a potential for common cause failures, the purpose of Environmental Qualification (EQ) is to demonstrate the capability of safety-related equipment to perform its safety function in aged conditions and under extreme conditions after design bases event (DBE). EQ is one of the steps in licensing process according to US regulatory documents and standards (10CFR50.49, RG 1.89, NUREG-0588, IEEE-323). This paper presents the efforts in establishing the EQ program in the Krsko nuclear power plant. (author)

  2. Data Qualification guidelines

    International Nuclear Information System (INIS)

    Edwards, T.B.; Shine, E.P.

    1992-01-01

    Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process

  3. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3

  4. Status report on preparation of IAEA guidelines for qualification of research reactor fuels

    International Nuclear Information System (INIS)

    Snelgrove, J.L.

    2007-01-01

    The International Atomic Energy Agency, through a consultancy, is preparing a document describing good practices for the qualification of research reactor fuel. The rationale for the preparation of the document and the document's organization and content are discussed. It is anticipated that the consultants will present a final draft to the IAEA by mid-December for editing and publication in 2008.

  5. Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Thomas J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howard, Richard H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rader, Jordan D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

  6. Rethink! prototyping transdisciplinary concepts of prototyping

    CERN Document Server

    Nagy, Emilia; Stark, Rainer

    2016-01-01

    In this book, the authors describe the findings derived from interaction and cooperation between scientific actors employing diverse practices. They reflect on distinct prototyping concepts and examine the transformation of development culture in their fusion to hybrid approaches and solutions. The products of tomorrow are going to be multifunctional, interactive systems – and already are to some degree today. Collaboration across multiple disciplines is the only way to grasp their complexity in design concepts. This underscores the importance of reconsidering the prototyping process for the development of these systems, particularly in transdisciplinary research teams. “Rethinking Prototyping – new hybrid concepts for prototyping” was a transdisciplinary project that took up this challenge. The aim of this programmatic rethinking was to come up with a general concept of prototyping by combining innovative prototyping concepts, which had been researched and developed in three sub-projects: “Hybrid P...

  7. Architectures of prototypes and architectural prototyping

    DEFF Research Database (Denmark)

    Hansen, Klaus Marius; Christensen, Michael; Sandvad, Elmer

    1998-01-01

    together as a team, but developed a prototype that more than fulfilled the expectations of the shipping company. The prototype should: - complete the first major phase within 10 weeks, - be highly vertical illustrating future work practice, - continuously live up to new requirements from prototyping......This paper reports from experience obtained through development of a prototype of a global customer service system in a project involving a large shipping company and a university research group. The research group had no previous knowledge of the complex business of shipping and had never worked...... sessions with users, - evolve over a long period of time to contain more functionality - allow for 6-7 developers working intensively in parallel. Explicit focus on the software architecture and letting the architecture evolve with the prototype played a major role in resolving these conflicting...

  8. Information for irradiation and post-irradiation of the silicide fuel element prototype P-07

    International Nuclear Information System (INIS)

    Abbate, Maximo J.; Sbaffoni, Maria M.

    2003-01-01

    Included in the 'Silicides' Project, developed by the Nuclear Fuels Department of the National Atomic Energy Commission (CNEA), it is foreseen the qualification of this type of fuel for research reactors in order to be used in the Argentine RA-3 reactor and to confirm the CNEA as an international supplier. The paper presents basic information on several parameters corresponding to the new silicide prototype, called P-07, to be taken into account for its irradiation, postirradiation and qualification. (author)

  9. Nuclear Criticality Safety Organization qualification program. Revision 4

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1997-01-01

    The Nuclear Criticality Safety Organization (NCSO) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSO technical and managerial qualification as required by the Y-12 Training Implementation Matrix (TIM). It is implemented through a combination of LMES plant-wide training courses and professional nuclear criticality safety training provided within the organization. This Qualification Program is applicable to technical and managerial NCSO personnel, including temporary personnel, sub-contractors and/or LMES employees on loan to the NCSO, who perform the NCS tasks or serve NCS-related positions as defined in sections 5 and 6 of this program

  10. Environmental data qualification system

    International Nuclear Information System (INIS)

    Hester, O.V.; Groh, M.R.

    1989-01-01

    The Integrated Environmental Data Management System (IEDMS) is a PC-based system that can support environmental investigations from their design stage and throughout the duration of the study. The system integrates data originating from the Sampling and Analysis Plan, field data and analytical findings. The IEDMS automated features include sampling guidance forms, barcoded sample labels and tags, field and analytical forms reproduction, sample tracking, analytical data qualification, completeness reports, and results and QC data reporting. The IEDMS has extensive automated capabilities that support a systematic and comprehensive process for performing quality assessment of EPA-CLP chemical analyses data. One product of this process is a unique and extremely useful tabular presentation of the data. One table contains the complete set of results and QC data included on the CLP data forms while presenting the information consistent with the chronology in which the analysis was performed. 3 refs., 1 fig

  11. Requirements for qualification of manufacture of the ITER Central Solenoid and Correction Coils

    Energy Technology Data Exchange (ETDEWEB)

    Libeyre, Paul, E-mail: paul.libeyre@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Li, Hongwei [ITER China, 15B Fuxing Road, Beijing 100862 (China); Reiersen, Wayne [US ITER Project Office, 1055 Commerce Park Dr., Oak Ridge, TN 37831 (United States); Dolgetta, Nello; Jong, Cornelis; Lyraud, Charles; Mitchell, Neil; Laurenti, Adamo [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Sgobba, Stefano [CERN, CH-1211 Genève 23 (Switzerland); Turck, Bernard [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Martovetsky, Nicolai; Everitt, David; Freudenberg, K.; Litherland, Steve; Rosenblad, Peter [US ITER Project Office, 1055 Commerce Park Dr., Oak Ridge, TN 37831 (United States); Smith, John; Spitzer, Jeff [General Atomics, P.O. Box 85608, San Diego, CA 92186-5608 (United States); Wei, Jing; Dong, Xiaoyu; Fang, Chao [ASIPP, Shushan Hu Road 350, Hefei, Anhui 230031 (China); and others

    2015-10-15

    Highlights: • A manufacturing line is installed for the ITER Correction Coils. • A manufacturing line is under installation for the ITER Central Solenoid. • Qualification of the manufacturing procedures has started for both manufacturing lines and acceptance criteria set. • Winding procedure of Correction Coils is qualified. - Abstract: The manufacturing line of the ITER Correction Coils (CC) at ASIPP in Hefei (China) was completed in 2013 and the manufacturing line of the ITER Central Solenoid (CS) modules is under installation at General Atomic premises in Poway (USA). In both cases, before starting production of the first coils, qualification of the manufacturing procedures is achieved by the construction of a set of mock-ups and prototypes to demonstrate that design requirements defined by the ITER Organization are effectively met. For each qualification item, the corresponding mock-ups are presented with the tests to be performed and the related acceptance criteria. The first qualification results are discussed.

  12. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  13. Majorana Thermosyphon Prototype Experimental Results

    International Nuclear Information System (INIS)

    Fast, James E.; Reid, Douglas J.; Aguayo Navarrete, Estanislao

    2010-01-01

    The Majorana demonstrator will operate at liquid Nitrogen temperatures to ensure optimal spectrometric performance of its High Purity Germanium (HPGe) detector modules. In order to transfer the heat load of the detector module, the Majorana demonstrator requires a cooling system that will maintain a stable liquid nitrogen temperature. This cooling system is required to transport the heat from the detector chamber outside the shield. One approach is to use the two phase liquid-gas equilibrium to ensure constant temperature. This cooling technique is used in a thermosyphon. The thermosyphon can be designed so the vaporization/condensing process transfers heat through the shield while maintaining a stable operating temperature. A prototype of such system has been built at PNNL. This document presents the experimental results of the prototype and evaluates the heat transfer performance of the system. The cool down time, temperature gradient in the thermosyphon, and heat transfer analysis are studied in this document with different heat load applied to the prototype.

  14. Decree of the State Office for Nuclear Safety No. 146/1997 of 18 June 1997 specifying activities which have an immediate impact on nuclear safety, and activities which are particularly important with respect to radiation protection, requirements for qualification and professional training, procedures for examining special professional competence and for granting certificates to selected personnel, and the scope and structure of documentation to be approved for permitting the training of selected personnel

    International Nuclear Information System (INIS)

    1997-01-01

    The Decree specifies requirements in the following fields: (a) activities which have an immediate impact on nuclear safety and activities which are particularly important with respect to radiation protection; (b) requirements for the qualification of selected personnel; (c) requirements for professional training of selected personnel of nuclear facilities and selected personnel handling ionizing radiation sources who are to gain special professional competence; (d) examination commission; (e) examination of special professional competence of selected personnel of nuclear facilities and selected personnel handling ionizing radiation sources; (f) granting permission to perform activities of selected personnel; and (g) scope and structure of documentation required to permit professional training of selected personnel of nuclear facilities and selected personnel handling ionizing radiation sources. (P.A.)

  15. Hoisting and rigging manual: Uncontrolled document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-05-01

    This document is a draft copy of a Hoisting and Rigging Manual for the Department of Energy. The manual is divided into ten chapters. The chapter titles follow: terminology and definitions; operator training and qualification; overhead and gantry cranes; mobile cranes; forklift trucks; hoists; hooks; wire rope, slings, and rigging accessories; construction hoisting and rigging equipment requirements; references.

  16. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 2 discusses the following topics: Fuel Rod Extraction System Test Results and Analysis Reports and Clamping Table Test Results and Analysis Reports

  17. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 9 discusses the following topics: Integrated System Normal Operations Test Results and Analysis Report; Integrated System Off-Normal Operations Test Results and Analysis Report; and Integrated System Maintenance Operations Test Results and Analysis Report

  18. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 8 discusses Control System SOT Tests Results and Analysis Report. This is a continuation of Book 7

  19. Prototypical Rod Construction Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report

  20. 1E Qualification of Electrical Equipment - Requirement for Safety Nuclear Power Plants

    International Nuclear Information System (INIS)

    Geambasu, C.; Segarceanu, D.; Albu, J.

    2002-01-01

    The paper presents the qualification methods of the safety related equipment according to the safety class 1E. There are presented the qualification principles, procedure and documents, emphasis being laid on the qualification approach by type tests. This approach assumes the equipment test under both normal and accident conditions (design basis events) simulating the operational conditions and covers the largest part of electrical equipment from a nuclear power plant.The safety related equipment is to be qualified is subjected to a sequential test that will be detailed in the paper. (author)

  1. Nuclear safety review for qualification of class 1E motor inside containment for nuclear power stations

    International Nuclear Information System (INIS)

    Li Shixin; Wu Qi; Zhang Yunbo; Wu Caixia

    2013-01-01

    In nuclear power plants with pressurized water reactors, the review for class 1E motor inside containment qualification process and documents is an important aspect of nuclear safety equipment review, and the reviewers should make evaluations for the qualification test results in terms of the compliance with standard and regulation, and the consistency with inside containment environment. Firstly, this paper introduces the qualification test of class 1E motor inside containment for nuclear power generating stations, such as aging test and design-basis-event test. Second, there is a discussion about typical problems of review. At last, comparison of IEEE334 with RCC-E is conducted and explored. (authors)

  2. Radiated EMC& EMI Management During Design Qualification and Test Phases on LEO Satellites Constellation

    Science.gov (United States)

    Blondeaux, H.; Terral, M.; Gutierrez-Galvan, R.; Baud, C.

    2016-05-01

    The aim of the proposed paper is to present the global radiated EMC/EMI approach applied by Thales Alenia Space in the frame of a telecommunication Low Earth Orbit (LEO) satellites constellation program. The paper will present this approach in term of analyses, of specific characterisation and of sub-system and satellite tests since first design reviews up-to satellite qualification tests on Prototype Flight Model (PFM) and to production tests on reduced FMs. The global aim is : 1 - to reduce risk and cost (units EMC delta qualification, EMC tests at satellite level for the 81 Space Vehicles (SV) through appropriated EMC analyses (in term of methodologies and contours) provided in the frame of design reviews.2 - to early anticipate potential critical case to reduce the impact in term of engineering/qualification/test extra cost and of schedule.3 - to secure/assure the payload and SV design/layout.4 - to define and optimize the EMC/EMI test campaigns to be performed on Prototype Flight Model (PFM) for complete qualification and on some FMs for industrial qualification/validation.The last part of the paper is dedicated to system Bite Error Rate (BER) functional test performed on PFM SV to demonstrate the final compatibility between the three on-board payloads and to the Internal EMC tests performed on PFM and some FMs to demonstrate the SV panel RF shielding efficiency before and after environmental tests and the Thales Alenia Space (TAS) and Orbital AKT (OATK) workmanships reproducibility.

  3. IEEE Standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 279-1979 and IEEE Std 308-1978, can be demonstrated by using the procedures provided in this Standard in accordance with IEEE Std 323-1974. Battery sizing, maintenance, capacity testing, installation, charging equipment and consideration of other types batteries are beyond the scope of this Standard

  4. Dynamic testing and qualification

    International Nuclear Information System (INIS)

    Kleine Tebbe, A.; Schmidt, G.; Theymann, W.

    1990-01-01

    The core structure of an HTR-plant consists of the side reflector, the bottom reflector, the top reflector and the pebble bed of spherical fuel elements. Dynamically this system is a many-body structure with non-linear force-deformation couplings. The integrity of the system under seismic loads is given by radially orientated spring packs. These spring packs must be stiff against earthquake loads, but must allow radial thermal movements. To verify the seismic safety of the system, scaled-down models were tested. The results of these tests were compared with those of analytical methods. The good-natured behaviour of the pebble-bed under seismic loads has been confirmed. Due to the granular structure of the non-regular packed pebble-bed, high damping occurs during seismic excitations. With increasing depth the damping ratio decreases because of restriction of movement. We are able to describe the seismic behaviour of the pebble-bed analytically. The one- and two-dimensional test configurations of the top reflector were used to analyse resonance and lumping effects. The experimental results were verified by the computer codes CRUNCH-1D AND CRUNCH-2D. The experimental investigations of the side reflector are underway. The results show a non-critical behaviour under horizontal excitations. Small rigid-body motions of single blocks are detected, but they do not cause any global ovalisations of the complete ring structure. Finite element calculations with contact and friction between the blocks show a close agreement with the experimental results. Seismic qualification of ground mounted electrical equipment is usually performed on the basis of codes like IEEE, IEC, KTA, etc. These standards give different possibilities of the excitation mode: sinusoidal excitation in every natural frequency (continuous or sine beat) or time history excitation which covers a prescribed required response spectrum. Recently performed tests are compared regarding the usefulness and severity

  5. Advanced qualification techniques

    International Nuclear Information System (INIS)

    Winokur, P.S.; Shaneyfelt, M.R.; Meisenheimer, T.L.; Fleetwood, D.M.

    1993-01-01

    This paper demonstrates use of the Qualified Manufacturers List (QML) methodology to qualify commercial and military microelectronics for use in space applications. QML ''builds in'' the hardness of product through statistical process control (SPC) of technology parameters relevant to the radiation response, test structure to integrated circuit (IC) correlations, and techniques for extrapolating laboratory test results to low-dose-rate space scenarios. Each of these elements is demonstrated and shown to be a cost-effective alternative to expensive end-of-line IC testing. Several examples of test structured-IC correlations are provided and recent work on complications arising from transistor scaling and geometry is discussed. The use of a 10-keV x-ray wafer-level test system to support SPC and establish ''process capability'' is illustrated and a comparison of 10-keV x-ray and Co 60 gamma irradiations is provided for a wide range of CMOS technologies. The x-ray tester is shown to be cost-effective and its use in lot acceptance/qualification is recommended. Finally, a comparison is provided between MIL-STD-883D, Test Method 1019.4, which governs the testing of packaged semiconductor microcircuits in the DoD, and ESA/SSC Basic Specification No. 22900, Europe's Total Dose Steady-State Irradiation Test Method. Test Method 1019.4 focuses on conservative estimates of MOS hardness for space and tactical applications, while Basic Specification 22900 focuses on improved simulation of low-dose-rate space environments

  6. Imagining the prototype

    OpenAIRE

    Brouwer, C. E.; Bhomer, ten, M.; Melkas, H.; Buur, J.

    2013-01-01

    This article reports on the analysis of a design session, employing conversation analysis. In the design session three experts and a designer discuss a prototype of a shirt, which has been developed with the input from these experts. The analysis focuses on the type of involvement of the participants with the prototype and how they explicate the points they make in the discussion with or without making use of the prototype. Three techniques for explicating design issues that exploit the proto...

  7. Rapid Prototyping Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — The ARDEC Rapid Prototyping (RP) Laboratory was established in December 1992 to provide low cost RP capabilities to the ARDEC engineering community. The Stratasys,...

  8. Fabrication and Prototyping Lab

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose: The Fabrication and Prototyping Lab for composite structures provides a wide variety of fabrication capabilities critical to enabling hands-on research and...

  9. Test-qualification experience with non-destructive material analysis system performed at Paks Nuclear Power Plant and its usage in non-nuclear fields

    International Nuclear Information System (INIS)

    Somogyi, Gy.; Szabo, D.

    2003-01-01

    The need for qualification of non-destructive material analysis has been recognised in controlling nuclear energy production process. This test-qualification has been performed as first of its kind after the task has been assigned by the National Nuclear Energy Agency. The input documents for the test were. Technical Specification, Analysis Technology, Technical Justification. Test-qualification has been performed with real form control bodies developed by the Rez Nuclear Research Institute, in which the planned defects has been produced by spark-chipping. The qualification procedure has been summarized in a Qualification Folder and given to the national agency to issue a qualification certificate. The procedure might be interesting mostly for companies delivering nuclear power plant assemblies. Similar needs are formulated in standards relative to the qualification of non-nuclear material testing methods (MSZ EN 17025 and EU). (Gy.M.)

  10. Non-destructive qualification tests for ITER cryogenic axial insulating breaks

    International Nuclear Information System (INIS)

    Kosek, Jacek; Lopez, Roberto; Tommasini, Davide; Rodriguez-Mateos, Felix

    2014-01-01

    In the ITER superconducting magnets the dielectric separation between the CICC (Cable-In-Conduit Conductors) and the helium supply pipes is made through the so-called insulating breaks (IB). These devices shall provide the required dielectric insulation at a 30 kV level under different types of stresses and constraints: thermal, mechanical, dielectric and ionizing radiations. As part of the R and D program, the ITER Organization launched contracts with industrial companies aimed at the qualification of the manufacturing techniques. After reviewing the main functional aspects, this paper describes and discusses the protocol established for non-destructive qualification tests of the prototypes

  11. Product qualification: a barrier to point-of-care microfluidic-based diagnostics?

    Science.gov (United States)

    Tantra, Ratna; van Heeren, Henne

    2013-06-21

    One of the most exciting applications of microfluidics-based diagnostics is its potential use in next generation point-of-care (POC) devices. Many prototypes are already in existence, but, as of yet, few have achieved commercialisation. In this article, we consider the issue surrounding product qualification as a potential barrier to market success. The study discusses, in the context of POC microfluidics-based diagnostics, what the generic issues are and potential solutions. Our findings underline the need for a community-based effort that is necessary to speed up the product qualification process.

  12. Non-destructive qualification tests for ITER cryogenic axial insulating breaks

    Energy Technology Data Exchange (ETDEWEB)

    Kosek, Jacek [Wroclaw University of Technology, Wybrzeze Wyspianskiego 27, 50-370 Wroclaw, Poland and CERN, Geneva 23,CH-1211 (Switzerland); Lopez, Roberto; Tommasini, Davide [CERN, Geneva 23,CH-1211 (Switzerland); Rodriguez-Mateos, Felix [CERN, Geneva 23,CH-1211, Switzerland and ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul lez Durance (France)

    2014-01-29

    In the ITER superconducting magnets the dielectric separation between the CICC (Cable-In-Conduit Conductors) and the helium supply pipes is made through the so-called insulating breaks (IB). These devices shall provide the required dielectric insulation at a 30 kV level under different types of stresses and constraints: thermal, mechanical, dielectric and ionizing radiations. As part of the R and D program, the ITER Organization launched contracts with industrial companies aimed at the qualification of the manufacturing techniques. After reviewing the main functional aspects, this paper describes and discusses the protocol established for non-destructive qualification tests of the prototypes.

  13. Standardization Documents

    Science.gov (United States)

    2011-08-01

    Specifications and Standards; Guide Specifications; CIDs; and NGSs . Learn. Perform. Succeed. STANDARDIZATION DOCUMENTS Federal Specifications Commercial...national or international standardization document developed by a private sector association, organization, or technical society that plans ...Maintain lessons learned • Examples: Guidance for application of a technology; Lists of options Learn. Perform. Succeed. DEFENSE HANDBOOK

  14. High Heat Flux Test of the ITER FW Semi-prototype Mockups

    International Nuclear Information System (INIS)

    Bae, Young Dug; Lee, Dong Won; Kim, Suk Kwon; Yoon, Jae Sung; Hong, Bong Guen

    2010-01-01

    As a procurement party of the ITER (International Thermonuclear Experimental Reactor) blanket project, we have to pass the qualification program which comprises two distinct phases; Phases 1 is about qualifying joining techniques, and phase 2 covers production scaled up component which is so called 'semi-prototype' and the enhanced heat flux qualification. We have constructed the FWQMs (First Wall Qualification Mockups) and already passed the qualification thermal fatigue tests organized by the IO (ITER Organization). The tests were performed at the EB-1200 in the USA and at the BESTH /JUDITH-2 in the EU. For the phase 2 qualification, the semi-prototype design will be provided by the IO. Even though the design has not fixed because the generic design of the first wall is not fixed, it shall comprise a minimum of 3 full length pairs of first wall fingers. We designed and fabricated two semi-prototype mockups which have a full length pair of first wall finger. The two mockups were designed to have different types of the cooling channels; one has a plain rectangular cross-section and the other has a hypervapotron type cooling channel. In order to compare the cooling capability of the two types, we performed high heat flux tests of the two mockups at the KoHLT-2

  15. Qualification of software and hardware

    International Nuclear Information System (INIS)

    Gossner, S.; Schueller, H.; Gloee, G.

    1987-01-01

    The qualification of on-line process control equipment is subdivided into three areas: 1) materials and structural elements; 2) on-line process-control components and devices; 3) electrical systems (reactor protection and confinement system). Microprocessor-aided process-control equipment are difficult to verify for failure-free function owing to the complexity of the functional structures of the hardware and to the variety of the software feasible for microprocessors. Hence, qualification will make great demands on the inspecting expert. (DG) [de

  16. 5 CFR 319.302 - Individual qualifications.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Individual qualifications. 319.302... Individual qualifications. Agency heads are delegated authority to approve the qualifications of individuals appointed to SL and ST positions. The agency head must determine that the individual meets the...

  17. Changing existing qualifications into outcomes-based qualifications ...

    African Journals Online (AJOL)

    Various workshops were facilitated to determine the outcomes of each level of our qualification, B Tech: Policing. This led to the formulation of a purpose statement, exit level outcomes and specific outcomes as well as assessment criteria and the critical outcomes embedded in each level identified. Using the specific ...

  18. Designing and testing prototypes

    NARCIS (Netherlands)

    Vereijken, P.; Wijnands, F.; Stol, W.

    1995-01-01

    This second progress report focuses on designing a theoretical prototype by linking parameters to methods and designing the methods in this context until they are ready for initial testing. The report focuses also on testing and improving the prototype in general and the methods in particular until

  19. EUCLID ARCHIVE SYSTEM PROTOTYPE

    NARCIS (Netherlands)

    Belikov, Andrey; Williams, Owen; Droge, Bob; Tsyganov, Andrey; Boxhoorn, Danny; McFarland, John; Verdoes Kleijn, Gijs; Valentijn, E; Altieri, Bruno; Dabin, Christophe; Pasian, F.; Osuna, Pedro; Soille, P.; Marchetti, P.G.

    2014-01-01

    The Euclid Archive System prototype is a functional information system which is used to address the numerous challenges in the development of fully functional data processing system for Euclid. The prototype must support the highly distributed nature of the Euclid Science Ground System, with Science

  20. Specifications in software prototyping

    OpenAIRE

    Luqi; Chang, Carl K.; Zhu, Hong

    1998-01-01

    We explore the use of software speci®cations for software prototyping. This paper describes a process model for software prototyping, and shows how specifications can be used to support such a process via a cellular mobile phone switch example.

  1. EPCiR prototype

    DEFF Research Database (Denmark)

    2003-01-01

    A prototype of a residential pervasive computing platform based on OSGi involving among other a mock-up of an health care bandage.......A prototype of a residential pervasive computing platform based on OSGi involving among other a mock-up of an health care bandage....

  2. Qualification criteria verification for aisi-4340 steel suspension lug

    International Nuclear Information System (INIS)

    Riaz, M.A.; Alam, M.

    2005-01-01

    All external loads carried underneath an aircraft are mounted onto it through mechanism generally known as suspension system. The externally mounted attachments like bombs, missiles and fuel tanks etc. experience enormous aerodynamic and inertial forces in the flights. These forces are transferred to the interface point of suspension system, known as 'Suspension Lug'. Thus lugs are considered critical component and have extremely stringent qualification criteria standards used in the aviation industry in USA, Europe, Russia, etc. Different standards prevail in different parts of the world about qualification and testing of these lugs. As Pakistan is entering into aviation industry, therefore there is a need to fulfill the requirements of these standards, to suit Pakistani environment. The suspension lug under study is 2000 Ibs. load class made from AISI-4340 Steel having good mechanical properties as per required standard. The manufacturing processes included forging, machining and vacuum heat treatment. The prototypes of suspension lugs were manufactured in the local industry and subjected to the required mechanical tests such as tensile testing at 5 to 35 degree angles. Impact testing at cryogenic temperatures of -50 to -70 degree C, and breaking load testing were performed. The acceptable results were obtained and mechanical testing for qualification of lugs was finalized and standardized. The options were compared with practical viability, utilization of product and cost effectiveness. (author)

  3. SIMS Prototype System 4: performance test report

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-09

    The results obtained during testing of a self-contained, preassembled air type solar system, designed for installation remote from the dwelling, to provide space heating and hot water are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 4 for field installation.

  4. Column Stores as an IR Prototyping Tool

    NARCIS (Netherlands)

    H.F. Mühleisen (Hannes); T. Samar (Thaer); J.J.P. Lin (Jimmy); A.P. de Vries (Arjen)

    2014-01-01

    textabstract. We make the suggestion that instead of implementing custom index structures and query evaluation algorithms, IR researchers should simply store document representations in a column-oriented relational database and write ranking models using SQL. For rapid prototyping, this is

  5. SANSMIC design document.

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Paula D. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Rudeen, David Keith [GRAM, Inc., Albuquerque, NM (United States)

    2015-07-01

    The United States Strategic Petroleum Reserve (SPR) maintains an underground storage system consisting of caverns that were leached or solution mined in four salt domes located near the Gulf of Mexico in Texas and Louisiana. The SPR comprises more than 60 active caverns containing approximately 700 million barrels of crude oil. Sandia National Labo- ratories (SNL) is the geotechnical advisor to the SPR. As the most pressing need at the inception of the SPR was to create and fill storage volume with oil, the decision was made to leach the caverns and fill them simultaneously (leach-fill). Therefore, A.J. Russo developed SANSMIC in the early 1980s which allows for a transient oil-brine interface (OBI) making it possible to model leach-fill and withdrawal operations. As the majority of caverns are currently filled to storage capacity, the primary uses of SANSMIC at this time are related to the effects of small and large withdrawals, expansion of existing caverns, and projecting future pillar to diameter ratios. SANSMIC was identified by SNL as a priority candidate for qualification. This report continues the quality assurance (QA) process by documenting the "as built" mathematical and numerical models that comprise this document. The pro- gram flow is outlined and the models are discussed in detail. Code features that were added later or were not documented previously have been expounded. No changes in the code's physics have occurred since the original documentation (Russo, 1981, 1983) although recent experiments may yield improvements to the temperature and plume methods in the future.

  6. Cooperative Prototyping Experiments

    DEFF Research Database (Denmark)

    Bødker, Susanne; Grønbæk, Kaj

    1989-01-01

    This paper describes experiments with a design technique that we denote cooperative prototyping. The experiments consider design of a patient case record system for municipal dental clinics in which we used HyperCard, an off the shelf programming environment for the Macintosh. In the ecperiments we...... tried to achieve a fluent work-like evaluation of prototypes where users envisioned future work with a computer tool, at the same time as we made on-line modifications of prototypes in cooperation with the users when breakdown occur in their work-like evaluation. The experiments showed...... that it was possible to make a number of direct manipulation changes of prototypes in cooperation with the users, in interplay with their fluent work-like evaluation of these. However, breakdown occurred in the prototyping process when we reached the limits of the direct manipulation support for modification. From...

  7. FY97 ICCS prototype specification

    International Nuclear Information System (INIS)

    Woodruff, J.

    1997-01-01

    The ICCS software team will implement and test two iterations of their software product during FY97. This document specifies the products to be delivered in that first prototype and projects the direction that the second prototype will take. Detailed specification of the later iteration will be written when the results of the first iteration are complete. The selection of frameworks to be implemented early is made on a basis of risk analysis from the point of view of future development in the ICCS project. The prototype will address risks in integration of object- oriented components, in refining our development process, and in emulation testing for FEP devices. This document is a specification that identifies products and processes to undertake for resolving these risks. The goals of this activity are to exercise our development process at a modest scale and to probe our architecture plan for fundamental limits and failure modes. The product of the iterations will be the framework software which will be useful in future ICCS code. Thus the FY97 products are intended for internal usage by the ICCS team and for demonstration to the FEP software developers of the strategy for integrating supervisory software with FEP computers. This will be the first of several expected iterations of the software development process and the performance measurements that ICCS will demonstrate, intended to support confidence in our ability to meet project RAM goals. The design of the application software is being carried out in a separate WBS 1.5.2 activity. The design activity has as its FY97 product a series of Software Design Documents that will specify the functionality of the controls software of ICCS. During the testing of this year''s prototypes, the application functionality needed for test will be provided by sample maintenance controls. These are early precursors of controls that can be used for low level device control. Since the devices under test will be represented by

  8. Maury Documentation

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Supporting documentation for the Maury Collection of marine observations. Includes explanations from Maury himself, as well as guides and descriptions by the U.S....

  9. Documentation Service

    International Nuclear Information System (INIS)

    Charnay, J.; Chosson, L.; Croize, M.; Ducloux, A.; Flores, S.; Jarroux, D.; Melka, J.; Morgue, D.; Mottin, C.

    1998-01-01

    This service assures the treatment and diffusion of the scientific information and the management of the scientific production of the institute as well as the secretariat operation for the groups and services of the institute. The report on documentation-library section mentions: the management of the documentation funds, search in international databases (INIS, Current Contents, Inspects), Pret-Inter service which allows accessing documents through DEMOCRITE network of IN2P3. As realizations also mentioned are: the setup of a video, photo database, the Web home page of the institute's library, follow-up of digitizing the document funds by integrating the CD-ROMs and diskettes, electronic archiving of the scientific production, etc

  10. Implementation and Qualifications Lessons Learned for Space Flight Photonic Components

    Science.gov (United States)

    Ott, Melanie N.

    2010-01-01

    This slide presentation reviews the process for implementation and qualification of space flight photonic components. It discusses the causes for most common anomalies for the space flight components, design compatibility, a specific failure analysis of optical fiber that occurred in a cable in 1999-2000, and another ExPCA connector anomaly involving pins that broke off. It reviews issues around material selection, quality processes and documentation, and current projects that the Photonics group is involved in. The importance of good documentation is stressed.

  11. Computerising documentation

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The nuclear power generation industry is faced with public concern and government pressures over safety, efficiency and risk. Operators throughout the industry are addressing these issues with the aid of a new technology - technical document management systems (TDMS). Used for strategic and tactical advantage, the systems enable users to scan, archive, retrieve, store, edit, distribute worldwide and manage the huge volume of documentation (paper drawings, CAD data and film-based information) generated in building, maintaining and ensuring safety in the UK's power plants. The power generation industry has recognized that the management and modification of operation critical information is vital to the safety and efficiency of its power plants. Regulatory pressure from the Nuclear Installations Inspectorate (NII) to operate within strict safety margins or lose Site Licences has prompted the need for accurate, up-to-data documentation. A document capture and management retrieval system provides a powerful cost-effective solution, giving rapid access to documentation in a tightly controlled environment. The computerisation of documents and plans is discussed in this article. (Author)

  12. Mutual Recogniton of Professional Qualifications

    DEFF Research Database (Denmark)

    Enemark, Stig; Plimmer, Francis

    The publication aims to review the concept of mutual recognition of qualifications within the world wide surveying community, and to develop a framework for the introduction of standards of global professional competence in this area. The publication also includes a number of case studies from...

  13. Helicopter-Ship Qualification Testing

    NARCIS (Netherlands)

    Hoencamp, A.

    2015-01-01

    The goal of this research project is to develop a novel test methodology which can be used for optimizing cost and time efficiency of helicopter-ship qualification testing without reducing safety. For this purpose, the so-called “SHOL-X” test methodology has been established, which includes the

  14. Personnel Officers: Judging Their Qualifications.

    Science.gov (United States)

    Webb, Gisela

    1988-01-01

    Discusses the backgrounds and qualifications appropriate for a library personnel administrator, including (1) a master's degree in library science; (2) library work experience; (3) additional training in administration, personnel management, organizational development, and psychology; and (4) personal attributes such as good communication skills,…

  15. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  16. Seismic and dynamic qualification methods

    International Nuclear Information System (INIS)

    Lin, C.W.

    1985-01-01

    This book presents the papers given at a conference on seismic effects on nuclear power plants. Topics considered at the conference included seismic qualification of equipment, multifrequency test methodologies, damping in piping systems, the amplification factor, thermal insulation, welded joints, and response factors for seismic risk analysis of piping

  17. Prototype road weather performance management tool : installation instructions & user manual.

    Science.gov (United States)

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  18. Report on detailed requirements for the INFLO prototype.

    Science.gov (United States)

    2013-12-01

    This report documents the System Requirements for the implementation of the Intelligent Network Flow Optimization (INFLO) : Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle Program. It builds off of : t...

  19. Report on architecture description for the INFLO prototype.

    Science.gov (United States)

    2014-01-01

    This report documents the Architecture Description for the implementation of the Intelligent Network Flow Optimization : (INFLO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle Program. The : intent is...

  20. PRMS Data Warehousing Prototype

    Science.gov (United States)

    Guruvadoo, Eranna K.

    2002-01-01

    Project and Resource Management System (PRMS) is a web-based, mid-level management tool developed at KSC to provide a unified enterprise framework for Project and Mission management. The addition of a data warehouse as a strategic component to the PRMS is investigated through the analysis, design and implementation processes of a data warehouse prototype. As a proof of concept, a demonstration of the prototype with its OLAP's technology for multidimensional data analysis is made. The results of the data analysis and the design constraints are discussed. The prototype can be used to motivate interest and support for an operational data warehouse.

  1. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2

    International Nuclear Information System (INIS)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A.; Naranjo U, J. L.

    2013-10-01

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  2. Recent developments in methodology for dynamic qualification of nuclear plant equipment

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-01-01

    Dynamic qualification of nuclear plant electrical and mechanical equipment is performed basically under guidelines given in IEEE Standards 323 and 344, and a variety of NRC regulatory guides. Over the last fifteen years qualification methodology prescribed by these documents has changed significantly as interpretations, equipment capability, and imagination of the qualification engineers have progressed. This progress has been sparked by concurrent NRC and industry sponsored research programs that have identified anomalies and developed new methodologies for resolving them. Revisions of the standards have only resulted after a lengthy debate of all such new information and subsequent judgment of its validity. The purpose of this paper is to review a variety of procedural improvements and developments in qualification methodology that are under current consideration as revisions to the standards. Many of the improvements and developments have resulted from recent research programs. All are very likely to appear in one type of standard or another in the near future

  3. AGC-3 Experiment Irradiation Monitoring Data Qualification Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hull, Laurence C. [Idaho National Lab. (INL), Idaho Falls, ID (United States). VHTR Technology Development Office

    2014-08-01

    The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. The third experiment, Advanced Graphite Creep 3 (AGC-3), began with Advanced Test Reactor (ATR) Cycle 152B on November 27, 2012, and ended with ATR Cycle 155B on April 23, 2014. This report documents qualification of AGC-3 experiment irradiation monitoring data for use by the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Program for research and development activities required to design and license the first VHTR nuclear plant. Qualified data meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements. Trend data may not meet the requirements, but may still provide some useable information. The report documents qualification of AGC-3 experiment irradiation monitoring data following MCP-2691. This report also documents whether AGC-3 experiment irradiation monitoring data meet the requirements for data collection as specified in technical and functional requirements documents and quality assurance (QA) plans. Data handling is described showing how data are passed from the data collection experiment to the Nuclear Data Management and Analysis System (NDMAS) team. The data structure is described, including data batches, components, attributes, and response variables. The description of the approach to data qualification includes the steps taken to qualify the data and the specific tests used to verify that the data meet requirements. Finally, the current status of the data received by NDMAS from the AGC-3 experiment is presented with summarized information on test results and resolutions. This report addresses all of the irradiation monitoring data collected during the AGC-3 experiment.

  4. MPACT Fast Neutron Multiplicity System Prototype Development

    Energy Technology Data Exchange (ETDEWEB)

    D.L. Chichester; S.A. Pozzi; J.L. Dolan; M.T. Kinlaw; S.J. Thompson; A.C. Kaplan; M. Flaska; A. Enqvist; J.T. Johnson; S.M. Watson

    2013-09-01

    This document serves as both an FY2103 End-of-Year and End-of-Project report on efforts that resulted in the design of a prototype fast neutron multiplicity counter leveraged upon the findings of previous project efforts. The prototype design includes 32 liquid scintillator detectors with cubic volumes 7.62 cm in dimension configured into 4 stacked rings of 8 detectors. Detector signal collection for the system is handled with a pair of Struck Innovative Systeme 16-channel digitizers controlled by in-house developed software with built-in multiplicity analysis algorithms. Initial testing and familiarization of the currently obtained prototype components is underway, however full prototype construction is required for further optimization. Monte Carlo models of the prototype system were performed to estimate die-away and efficiency values. Analysis of these models resulted in the development of a software package capable of determining the effects of nearest-neighbor rejection methods for elimination of detector cross talk. A parameter study was performed using previously developed analytical methods for the estimation of assay mass variance for use as a figure-of-merit for system performance. A software package was developed to automate these calculations and ensure accuracy. The results of the parameter study show that the prototype fast neutron multiplicity counter design is very nearly optimized under the restraints of the parameter space.

  5. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Oliver [European Commission, Joint Research Centre (JRC), Petten (Netherlands). Institute for Energy and Transport (IET); Martin, Etienne [EDF, St Denis (France). Direction Production Ingenierie; Booler, Russ [AMEC Clean Energy Europe, Warrington (United Kingdom); Zetterwall, Tommy [Swedish Qualification Centre, Taeby (Sweden); Walker, Tony [Rolls-Royce Submarines, Derby (United Kingdom)

    2014-10-15

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8{sup th} technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  6. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    International Nuclear Information System (INIS)

    Martin, Oliver; Martin, Etienne; Zetterwall, Tommy; Walker, Tony

    2014-01-01

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8 th technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  7. Intra and Inter-IOM Ccommunications Summary Document

    CERN Document Server

    Ambrosini, G; Cetin, S A; Conka, T; Fernandes, A; Francis, D; Joos, M; Lehmann, G; Mailov, A; Mapelli, L; Mornacchi, Giuseppe; Niculescu, M; Nurdan, K; Petersen, J; Spiwoks, R; Tremblet, L J; Ünel, G

    1999-01-01

    This document summarises the work performed, within the context of the DAQ-Unit of the DataFlow system in ATLAS DAQ/EF prototype -1 on intra and inter-Input/Output Module (IOM) message passing. This document fulfils the ATLAS DAQ/EF prototype -1 milestone of February 99.

  8. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Hassan, M.; Tanaka, T.J.

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

  9. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K.; Wood, R.T. [Oak Ridge National Lab., TN (United States); Hassan, M. [Brookhaven National Lab., Upton, NY (United States); Tanaka, T.J. [Sandia National Labs., Albuquerque, NM (United States)

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants.

  10. Developments in mechanical ultrasonic inspection and qualification of NDE

    International Nuclear Information System (INIS)

    Kauppinen, P.; Pitkaenen, J.; Kuusinen, P.

    2001-01-01

    Reliability of non-destructive testing results has a direct influence on structural integrity assessment and safety of the inspected structures e.g. NPP primary circuit pressure boundaries. Advanced technology together with highly skilled and experienced personnel is required. One of the current trends is automation. Mechanised equipment can replace tedious manual work in positioning and moving of the transducers. Large areas can be scanned, analysed and numerically documented for direct comparison of eventual later repeated inspections. Another major trend is qualification, which aims to ensure that the inspection results are correct and fit the purpose. The suitability and proper operation of equipment, methods and personnel i.e. the whole chain shall be proven. This presentation summarises the advances in automation and qualification of non-destructive inspection during the second project year, Monitoring of material degradation was included in the studied topics and will also be shortly described. (author)

  11. A Prototype: Reading of Documents Web for Visually Impaired Persons

    National Research Council Canada - National Science Library

    Santiago, S

    2001-01-01

    .... The system uses a multimedia speech synthesizer, into windows environment, The users could be normal persons searching filtered information without paying his whole attention, display-disable readers...

  12. A Prototype Security Mechanism for Xml Documents and Soap ...

    African Journals Online (AJOL)

    Cyber crime is a recurrent phenomenon on the internet despite various preventive measures towards these activities. As web servers develop means to protect their data and/or services, hackers are improving everyday on their skills to break these measures. It is in light of this that we developed a model that demonstrates ...

  13. High Temperature Materials Interim Data Qualification Report FY 2011

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2011-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim fiscal year (FY) 2011 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under the Nuclear Quality Assurance (NQA)-1 guidelines and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from seven test series within the High Temperature Materials data stream have been entered into the NDMAS vault, including tensile tests, creep tests, and cyclic tests. Of the 5,603,682 records currently in the vault, 4,480,444 have been capture passed, and capture testing is in process for the remaining 1,123,238.

  14. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    Science.gov (United States)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  15. ATLAS DBM Module Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Soha, Aria [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gorisek, Andrej [J. Stefan Inst., Ljubljana (Slovenia); Zavrtanik, Marko [J. Stefan Inst., Ljubljana (Slovenia); Sokhranyi, Grygorii [J. Stefan Inst., Ljubljana (Slovenia); McGoldrick, Garrin [Univ. of Toronto, ON (Canada); Cerv, Matevz [European Organization for Nuclear Research (CERN), Geneva (Switzerland)

    2014-06-18

    This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of Jozef Stefan Institute, CERN, and University of Toronto who have committed to participate in beam tests to be carried out during the 2014 Fermilab Test Beam Facility program. Chemical Vapour Deposition (CVD) diamond has a number of properties that make it attractive for high energy physics detector applications. Its large band-gap (5.5 eV) and large displacement energy (42 eV/atom) make it a material that is inherently radiation tolerant with very low leakage currents and high thermal conductivity. CVD diamond is being investigated by the RD42 Collaboration for use very close to LHC interaction regions, where the most extreme radiation conditions are found. This document builds on that work and proposes a highly spatially segmented diamond-based luminosity monitor to complement the time-segmented ATLAS Beam Conditions Monitor (BCM) so that, when Minimum Bias Trigger Scintillators (MTBS) and LUCID (LUminosity measurement using a Cherenkov Integrating Detector) have difficulty functioning, the ATLAS luminosity measurement is not compromised.

  16. Qualification and certification in NDT

    International Nuclear Information System (INIS)

    Hassan Kavarodi Maracair

    2003-01-01

    Ruane-TATI Sdn Bhd was the first accredited training centre in Asia approved by The British Institute of Non Destructive Testing (BINDT) as per EN 473, ISO 9712 and EN 45013 requirements. Meanwhile, Ruane-TATI is also accredited by National Vocational Training Center ( MLVK ).This mean that Ruane-TATI is the first training and examination center that accredited by both international and national bodies in providing quality , qualification and certification for comprehensive training and examination in Inspection and Non Destructive Testing (NDT). There are several NDT examinations scheme available in Malaysia due to differences requirement from the industrials. This has put the difficulties to services company in upgrading their NDT technician qualifications. The intention of this paper is to discuss the basic different among the NDT examinations scheme used in Malaysia ( mostly offered by Ruane-TATI ) and the development of certain schemes in covering their schemes to more sectors and NDT methods. (Author)

  17. Radiation Safety (Qualifications) Regulations 1980

    International Nuclear Information System (INIS)

    1980-01-01

    These Regulations, promulgated pursuant to the provisions of the Radiation Safety Act, 1975-1979, require persons engaged in activities involving radiation to pass a radiation safety examination or to possess an approved qualification in radiation. The National Health and Medical Research Council is authorised to exempt persons from compliance with these requirements or, conversely, to impose such requirements on persons other than those designated. (NEA) [fr

  18. Dose mapping for documentation of radiation sterilization

    DEFF Research Database (Denmark)

    Miller, A.

    1999-01-01

    The radiation sterilization standards EN 552 and ISO 11137 require that dose mapping in real or simulated product be carried in connection with the process qualification. This paper reviews the recommendations given in the standards and discusses the difficulties and limitations of practical dose...... mapping. The paper further gives recommendations for effective dose mapping including traceable dosimetry, documented procedures for placement of dosimeters, and evaluation of measurement uncertainties. (C) 1999 Elsevier Science Ltd. All rights reserved....

  19. CMS DOCUMENTATION

    CERN Multimedia

    CMS TALKS AT MAJOR MEETINGS The agenda and talks from major CMS meetings can now be electronically accessed from the iCMS Web site. The following items can be found on: http://cms.cern.ch/iCMS/ General - CMS Weeks (Collaboration Meetings), CMS Weeks Agendas The talks presented at the Plenary Sessions. LHC Symposiums Management - CB - MB - FB - FMC Agendas and minutes are accessible to CMS members through their AFS account (ZH). However some linked documents are restricted to the Board Members. FB documents are only accessible to FB members. LHCC The talks presented at the ‘CMS Meetings with LHCC Referees’ are available on request from the PM or MB Country Representative. Annual Reviews The talks presented at the 2006 Annual reviews are posted.   CMS DOCUMENTS It is considered useful to establish information on the first employment of CMS doctoral students upon completion of their theses. Therefore it is requested that Ph.D students inform the CMS Secretariat a...

  20. CMS DOCUMENTATION

    CERN Multimedia

    CMS TALKS AT MAJOR MEETINGS The agenda and talks from major CMS meetings can now be electronically accessed from the iCMS Web site. The following items can be found on: http://cms.cern.ch/iCMS/ General - CMS Weeks (Collaboration Meetings), CMS Weeks Agendas The talks presented at the Plenary Sessions. LHC Symposiums Management - CB - MB - FB - FMC Agendas and minutes are accessible to CMS members through their AFS account (ZH). However some linked documents are restricted to the Board Members. FB documents are only accessible to FB members. LHCC The talks presented at the ‘CMS Meetings with LHCC Referees’ are available on request from the PM or MB Country Representative. Annual Reviews The talks presented at the 2006 Annual reviews are posted. CMS DOCUMENTS It is considered useful to establish information on the first employment of CMS doctoral students upon completion of their theses. Therefore it is requested that Ph.D students inform the CMS Secretariat about the natu...

  1. CMS DOCUMENTATION

    CERN Multimedia

    CMS TALKS AT MAJOR MEETINGS The agenda and talks from major CMS meetings can now be electronically accessed from the iCMS Web site. The following items can be found on: http://cms.cern.ch/iCMS/ General - CMS Weeks (Collaboration Meetings), CMS Weeks Agendas The talks presented at the Plenary Sessions. LHC Symposiums Management - CB - MB - FB - FMC Agendas and minutes are accessible to CMS members through their AFS account (ZH). However some linked documents are restricted to the Board Members. FB documents are only accessible to FB members. LHCC The talks presented at the ‘CMS Meetings with LHCC Referees’ are available on request from the PM or MB Country Representative. Annual Reviews The talks presented at the 2006 Annual reviews are posted. CMS DOCUMENTS It is considered useful to establish information on the first employment of CMS doctoral students upon completion of their theses. Therefore it is requested that Ph.D students inform the CMS Secretariat about the natur...

  2. CMS DOCUMENTATION

    CERN Multimedia

    CMS TALKS AT MAJOR MEETINGS The agenda and talks from major CMS meetings can now be electronically accessed from the iCMS Web site. The following items can be found on: http://cms.cern.ch/iCMS/ Management- CMS Weeks (Collaboration Meetings), CMS Weeks Agendas The talks presented at the Plenary Sessions. Management - CB - MB - FB Agendas and minutes are accessible to CMS members through their AFS account (ZH). However some linked documents are restricted to the Board Members. FB documents are only accessible to FB members. LHCC The talks presented at the ‘CMS Meetings with LHCC Referees’ are available on request from the PM or MB Country Representative. Annual Reviews The talks presented at the 2007 Annual reviews are posted. CMS DOCUMENTS It is considered useful to establish information on the first employment of CMS doctoral students upon completion of their theses. Therefore it is requested that Ph.D students inform the CMS Secretariat about the nature of employment and ...

  3. CMS DOCUMENTATION

    CERN Multimedia

    CMS TALKS AT MAJOR MEETINGS The agenda and talks from major CMS meetings can now be electronically accessed from the iCMS Web site. The following items can be found on: http://cms.cern.ch/iCMS/ Management- CMS Weeks (Collaboration Meetings), CMS Weeks Agendas The talks presented at the Plenary Sessions. Management - CB - MB - FB Agendas and minutes are accessible to CMS members through their AFS account (ZH). However some linked documents are restricted to the Board Members. FB documents are only accessible to FB members. LHCC The talks presented at the ‘CMS Meetings with LHCC Referees’ are available on request from the PM or MB Country Representative. Annual Reviews The talks presented at the 2007 Annual reviews are posted. CMS DOCUMENTS It is considered useful to establish information on the first employment of CMS doctoral students upon completion of their theses. Therefore it is requested that Ph.D students inform the CMS Secretariat about the nature of em¬pl...

  4. CMS DOCUMENTATION

    CERN Multimedia

    CMS TALKS AT MAJOR MEETINGS The agenda and talks from major CMS meetings can now be electronically accessed from the iCMS Web site. The following items can be found on: http://cms.cern.ch/iCMS/ General - CMS Weeks (Collaboration Meetings), CMS Weeks Agendas The talks presented at the Plenary Sessions. LHC Symposiums Management - CB - MB - FB - FMC Agendas and minutes are accessible to CMS members through their AFS account (ZH). However some linked documents are restricted to the Board Members. FB documents are only accessible to FB members. LHCC The talks presented at the ‘CMS Meetings with LHCC Referees’ are available on request from the PM or MB Country Representative. Annual Reviews The talks presented at the 2006 Annual reviews are posted. CMS DOCUMENTS It is considered useful to establish information on the first employment of CMS doctoral students upon completion of their theses. Therefore it is requested that Ph.D students inform the CMS Secretariat about the na...

  5. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  6. Pilot study approach and qualification dossier components

    International Nuclear Information System (INIS)

    Ammirato, F.; Ashwin, P.

    2000-01-01

    The aim of the Pilot Project is to evaluate the IAEA Guidelines and methodology for the benefit of IAEA Member States trough a simulation of qualification activities. The Project is based on a real component and available data - NPP Kozloduy unit 5, weld 3. The initial phase is limited to the Qualification dossier. The Project relies on the input from the team members and Member States. Team organization and responsibilities are presented. The components of the Qualification Dossier (technical specification, inspection procedure and preliminary review, qualification procedure) and their current status are also presented. A comparison is done with their qualification programs. The characteristics of performance demonstrations are discussed. The results show that the teamwork has been successful and the IAEA methodology covers all situations. It is expected that the End Project will become 'Benchmark's' for future qualification activities

  7. Environmental qualification program for new designs

    International Nuclear Information System (INIS)

    Doerffer, K.

    2007-01-01

    Qualification of nuclear power plant equipment and components important to safety (ITS) is an integral part of the design process. The qualification methodology differs based on the severity of service conditions (operational and ambient), to which the ITS equipment is exposed. In Canada, the licensing requirements for environmental qualification for new designs are governed by the Canadian Standard Association (CSA) standard, N290.13-2005 titled 'Environmental Qualification of Equipment for CANDU Nuclear Power Plants' and the pre-consultation draft, 'Requirements for Design of Nuclear Power Plants'(DRD), issued for trial use by the Canadian Nuclear Safety Commission (CNSC) in March 2005. This paper will describe AECL's current Environmental Qualification program developed to comply with the above licensing requirements as applied to new designs. The focus will be given to qualification of ITS systems structures and components (SSC) to harsh conditions occurring due to the Design Basis Accidents (DBA). (author)

  8. ABOUT MODERN TECHNICAL GRAPHICS USING IN THE VIRTUAL PROTOTYPING

    Directory of Open Access Journals (Sweden)

    GHERGHINA George

    2008-07-01

    Full Text Available The paper presents aspects concerning the using of modern technical graphics elements in the virtual prototyping. The virtual prototyping is a process which uses a virtual prototype in place of physical prototype for the testing and the evaluation of specific features of designed product. The virtual prototype is created by computer such as it could assign the specific features as close as possible to the real conditions which permit its function simulation in the conditions for which is designed. The virtual prototyping permits the replacing of classical design process, although, and the elaboration of graphicalm documentation, which represent an important work volume – with CAD/CAM systems in the increased efficiency conditions.

  9. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report

  10. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 5 discusses the following topics: Lower Cutting System Test Results and Analysis Report; NFBC Loading System Test Results and Analysis Report; Robotic Bridge Transporter Test Results and Analysis Report; RM-10A Remotec Manipulator Test Results and Analysis Report; and Manipulator Transporter Test Results and Analysis Report

  11. From prototype to product

    DEFF Research Database (Denmark)

    Andersen, Tariq Osman; Bansler, Jørgen P.; Kensing, Finn

    2017-01-01

    This paper delves into the challenges of engaging patients, clinicians and industry stakeholders in the participatory design of an mHealth platform for patient-clinician collaboration. It follows the process from the development of a research prototype to a commercial software product. In particu......This paper delves into the challenges of engaging patients, clinicians and industry stakeholders in the participatory design of an mHealth platform for patient-clinician collaboration. It follows the process from the development of a research prototype to a commercial software product....... In particular, we draw attention to four major challenges of (a) aligning the different concerns of patients and clinicians, (b) designing according to clinical accountability, (c) ensuring commercial interest, and (d) dealing with regulatory constraints when prototyping safety critical health Information...... Technology. Using four illustrative cases, we discuss what these challenges entail and the implications they pose to Participatory Design. We conclude the paper by presenting lessons learned....

  12. Return of IEEE Std 627 and its Value to Equipment Qualification Programs

    International Nuclear Information System (INIS)

    Horvath, D.A.

    2012-01-01

    IEEE Std 627 ''Design Qualification of Safety Systems Equipment Used in Nuclear Power Generating Stations'' was issued to more generically establish qualification requirements in the form of a high level umbrella document. Efforts on this standard began in late 1975 at the request of the IEEE Nuclear Standards Management Board. In 1977 a joint ASME/IEEE agreement established responsibility for qualification and quality assurance standards preparation. ASME accepted responsibility for Quality Assurance and IEEE for qualification. In accordance with that agreement, IEEE completed the generic qualification standard in 1980. This document provided high level approaches, criteria, guidance, and principles for qualification of both electrical and mechanical equipment that at that time appeared in no other industry standard. IEEE Std 627-1980 was later reaffirmed in 1996. In 1986, ASME's Board on Nuclear Codes and Standards directed its Committee on Qualification of Mechanical Equipment (QME) to develop a standard for qualifying mechanical equipment. This task was completed in several parts during the time frame from 1992 to 1994. Partly in response to this activity, IEEE Std 627 was withdrawn in 2002. Later although withdrawn, it was found that IEEE Std 627 was continuing to be used and referenced by many entities both in the US and other countries including in ASME's QME-1-2002 ''Qualification of Active Mechanical Equipment Used in Nuclear Power Plants'', US NRC's NUREG-0800 Standard Review Plan Section 3.11, at least one reactor vendor's Design Certification Document (DCD), several international licensing documents, and elsewhere. As a result, in 2007, the IEEE Standards Board authorized Working Group 2.10 of Subcommittee 2 (Qualification) of the Power and Energy Society's Nuclear Power Engineering Committee to resurrect and update IEEE Std 627-1980 (Reaff 1996). The result was the culmination IEEE Std 627 in 2010. This paper will report on the eight improvements made

  13. ENIQ: European Network for Inspection Qualification

    International Nuclear Information System (INIS)

    Champigny, F.; Crutzen, S.; Lemaitre, P.

    1995-01-01

    Many countries are currently considering their own approach to inspection qualification and are carefully assessing experience to date. ENIQ, which stands for European Network for Inspection Qualification, groups the major part of the utilities in Western Europe. The general objective of ENIQ is to coordinate and manage at European level expertise and resources for the assessment and qualification of NDE inspection techniques and procedures, primarily for nuclear components. Also non-nuclear heavy duty components will be considered. Within ENIQ there is a growing consensus of opinion on the general principles of a European approach towards inspection qualification. In this paper the main activities, organization and actual status of ENIQ will be discussed

  14. Australian Qualifications Framework Lower-Level Qualifications: Pathways to Where for Young People?

    Science.gov (United States)

    Stanwick, John

    2005-01-01

    This study investigates where certificate I and II qualifications lead young people aged 15-24 years in terms of employment and further study. A prime motivation for young people undertaking these qualifications is to facilitate transition into the labour market. These qualifications are aimed at developing basic vocational skills or preparatory…

  15. An analysis of the qualification criteria for small radioactive material shipping packages

    Energy Technology Data Exchange (ETDEWEB)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described.

  16. An analysis of the qualification criteria for small radioactive material shipping packages

    International Nuclear Information System (INIS)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described

  17. Qualifications manual for Inspection and Enforcement personnel. Volume I. Detailed data sheets

    International Nuclear Information System (INIS)

    Bartley, H.J.; Heyer, F.H.K.; Schwartz, E.G.; Harrison, O.J.; Krass, I.W.; Welsh, D.M.

    1978-06-01

    This document is the General Research Corporation (GRC) final report on Task I Job/Position Qualifications Statements for the Headquarters and regional position of NRC/IE. It reflects the results of upgrading, expanding, and reformating the preliminary Task I report. To accomplish this, GRC made a thorough examination of all data developed during Task I, Task II (Career Fields), Task III (Training Evaluation), and Task IV (Hiring Qualifications), to include NRC/IE comments and management decisions received. The reformated Job/Position Qualifications Statements resulting from this effort (Appendix A) identify three job qualifications categories for each position--performance, attributes, and knowledge. Two formats are provided: a summarized one for manpower management in Volume I and a detailed one for career and training management in Volume II. In addition to recommending approval of the job/position qualifications, GRC proposes their use in conjunction with the hiring qualifications in the Task IV report to update NRC/IE job descriptions

  18. Document Models

    Directory of Open Access Journals (Sweden)

    A.A. Malykh

    2017-08-01

    Full Text Available In this paper, the concept of locally simple models is considered. Locally simple models are arbitrarily complex models built from relatively simple components. A lot of practically important domains of discourse can be described as locally simple models, for example, business models of enterprises and companies. Up to now, research in human reasoning automation has been mainly concentrated around the most intellectually intensive activities, such as automated theorem proving. On the other hand, the retailer business model is formed from ”jobs”, and each ”job” can be modelled and automated more or less easily. At the same time, the whole retailer model as an integrated system is extremely complex. In this paper, we offer a variant of the mathematical definition of a locally simple model. This definition is intended for modelling a wide range of domains. Therefore, we also must take into account the perceptual and psychological issues. Logic is elitist, and if we want to attract to our models as many people as possible, we need to hide this elitism behind some metaphor, to which ’ordinary’ people are accustomed. As such a metaphor, we use the concept of a document, so our locally simple models are called document models. Document models are built in the paradigm of semantic programming. This allows us to achieve another important goal - to make the documentary models executable. Executable models are models that can act as practical information systems in the described domain of discourse. Thus, if our model is executable, then programming becomes redundant. The direct use of a model, instead of its programming coding, brings important advantages, for example, a drastic cost reduction for development and maintenance. Moreover, since the model is well and sound, and not dissolved within programming modules, we can directly apply AI tools, in particular, machine learning. This significantly expands the possibilities for automation and

  19. PANDA Muon System Prototype

    Science.gov (United States)

    Abazov, Victor; Alexeev, Gennady; Alexeev, Maxim; Frolov, Vladimir; Golovanov, Georgy; Kutuzov, Sergey; Piskun, Alexei; Samartsev, Alexander; Tokmenin, Valeri; Verkheev, Alexander; Vertogradov, Leonid; Zhuravlev, Nikolai

    2018-04-01

    The PANDA Experiment will be one of the key experiments at the Facility for Antiproton and Ion Research (FAIR) which is under construction now in the territory of the GSI Helmholtz Centre for Heavy Ion Research in Darmstadt, Germany. PANDA is aimed to study hadron spectroscopy and various topics of the weak and strong forces. Muon System is chosen as the most suitable technology for detecting the muons. The Prototype of the PANDA Muon System is installed on the test beam line T9 at the Proton Synchrotron (PS) at CERN. Status of the PANDA Muon System prototype is presented with few preliminary results.

  20. Prototyping a Smart City

    DEFF Research Database (Denmark)

    Korsgaard, Henrik; Brynskov, Martin

    In this paper, we argue that by approaching the so-called Smart City as a design challenge, and an interaction design perspective, it is possible to both uncover existing challenges in the interplay between people, technology and society, as well as prototype possible futures. We present a case...... in which we exposed data about the online communication between the citizens and the municipality on a highly visible media facade, while at the same time prototyped a tool that enabled citizens to report ‘bugs’ within the city....

  1. PANDA Muon System Prototype

    Directory of Open Access Journals (Sweden)

    Abazov Victor

    2018-01-01

    Full Text Available The PANDA Experiment will be one of the key experiments at the Facility for Antiproton and Ion Research (FAIR which is under construction now in the territory of the GSI Helmholtz Centre for Heavy Ion Research in Darmstadt, Germany. PANDA is aimed to study hadron spectroscopy and various topics of the weak and strong forces. Muon System is chosen as the most suitable technology for detecting the muons. The Prototype of the PANDA Muon System is installed on the test beam line T9 at the Proton Synchrotron (PS at CERN. Status of the PANDA Muon System prototype is presented with few preliminary results.

  2. Interim staff position on environmental qualification of safety-related electrical equipment: including staff responses to public comments. Regulatory report

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1981-07-01

    This document provides the NRC staff positions regarding selected areas of environmental qualification of safety-related electrical equipment, in the resolution of Unresolved Safety Issue A-24, 'Qualification of Class IE Safety-Related Equipment.' The positions herein are applicable to plants that are or will be in the construction permit (CP) or operating license (OL) review process and that are required to satisfy the requirements set forth in either the 1971 or the 1974 version of IEEE-323 standard

  3. Qualification of NDE personnel in the nuclear industry

    International Nuclear Information System (INIS)

    Epps, T.N.

    1984-01-01

    There has been evidence of ineffective programs for certifying nondestructive examination (NDE) personnel who conduct periodic inservice examinations in nuclear power plants under ASME Section XI Code requirements. This was brought to the attention of a group from the electric utility industry, the Electric Power Research Institute (EPRI), some NDE consultants and representatives from the American Society of Mechanical Engineers (ASME) by the Nuclear Regulatory Commission (NRC) in a May, 1982 meeting in Bethesda, Maryland. One problem pointed out by the NRC was the lack of a clear definition of qualification requirements for certification of NDE personnel who conduct ASME Section XI Inservice Inspection work in nuclear power plants. The NRC requested that the nuclear industry resolve this problem by formulating definitive qualification requirements for personnel certification that could be made an industry requirement. In June, 1982 the EPRI NDE Subcommittee held a general meeting for utility representatives to discuss the results of the May, 1982 meeting to develop a plan for industry response to the issue. The consensus was that an Ad Hoc Committee of utility representatives be convened to develop a document outlining qualification requirements for vertification of NDE personnel. The Ad Hoc Committee was formally convened on September 29, 1982

  4. Building Skills and Qualifications among SME Employees. Leonardo da Vinci Good Practices Series.

    Science.gov (United States)

    Commission of the European Communities, Brussels (Belgium). Directorate-General for Education and Culture.

    This document profiles 10 European programs that exemplify good practice in building skills and qualifications among employees of small and medium enterprises (SMEs). The programs profiled are as follows: (1) TRICTSME (a program providing World Wide Web-based information and communication technologies training for SMEs in manufacturing); (2)…

  5. Qualifications of an Ideal Teacher According to Social Studies Preservice Teachers

    Science.gov (United States)

    Gencturk, Ebru; Akbas, Yavuz; Kaymakci, Selahattin

    2012-01-01

    In this study, the question of what kind of qualifications an ideal social studies teacher has tried to be investigated. For this purpose, freshman social studies preservice teachers' perceptions about the concept of "ideal teacher" were explored. This study was designed with document analysis, one of the methods of qualitative approach.…

  6. Structural qualification of the multifunctional instrument tree for installation in double-shell and 100-series single-shell tanks

    International Nuclear Information System (INIS)

    Strohlow, J.P.

    1995-12-01

    This document provides the technical basis and methodology for qualifying the multifunctional instrument tree (MIT) structure for installation in double-shell and 100-series single-shell tanks. Structural qualification for MIT installations in specific tanks are also contained in this document

  7. LEP vacuum chamber, prototype

    CERN Multimedia

    CERN PhotoLab

    1983-01-01

    Final prototype for the LEP vacuum chamber, see 8305170 for more details. Here we see the strips of the NEG pump, providing "distributed pumping". The strips are made from a Zr-Ti-Fe alloy. By passing an electrical current, they were heated to 700 deg C.

  8. Imagining the prototype

    NARCIS (Netherlands)

    Brouwer, C. E.; Bhomer, ten M.; Melkas, H.; Buur, J.

    2013-01-01

    This article reports on the analysis of a design session, employing conversation analysis. In the design session three experts and a designer discuss a prototype of a shirt, which has been developed with the input from these experts. The analysis focuses on the type of involvement of the

  9. MIND performance and prototyping

    International Nuclear Information System (INIS)

    Cervera-Villanueva, A.

    2008-01-01

    The performance of MIND (Magnetised Iron Neutrino Detector) at a neutrino factory has been revisited in a new analysis. In particular, the low neutrino energy region is studied, obtaining an efficiency plateau around 5 GeV for a background level below 10 -3 . A first look has been given into the detector optimisation and prototyping

  10. The prototype fast reactor

    International Nuclear Information System (INIS)

    Broomfield, A.M.

    1985-01-01

    The paper concerns the Prototype Fast Reactor (PFR), which is a liquid metal cooled fast reactor power station, situated at Dounreay, Scotland. The principal design features of a Fast Reactor and the PFR are given, along with key points of operating history, and health and safety features. The role of the PFR in the development programme for commercial reactors is discussed. (U.K.)

  11. AGS Booster prototype magnets

    Energy Technology Data Exchange (ETDEWEB)

    Danby, G.; Jackson, J.; Lee, Y.Y.; Phillips, R.; Brodowski, J.; Jablonski, E.; Keohane, G.; McDowell, B.; Rodger, E.

    1987-03-19

    Prototype magnets have been designed and constructed for two half cells of the AGS Booster. The lattice requires 2.4m long dipoles, each curved by 10/sup 0/. The multi-use Booster injector requires several very different standard magnet cycles, capable of instantaneous interchange using computer control from dc up to 10 Hz.

  12. AGS booster prototype magnets

    International Nuclear Information System (INIS)

    Danby, G.; Jackson, J.; Lee, Y.Y.; Phillips, R.; Brodowski, J.; Jablonski, E.; Keohane, G.; McDowell, B.; Rodger, E.

    1987-01-01

    Prototype magnets have been designed and constructed for two half cells of the AGS Booster. The lattice requires 2.4m long dipoles, each curved by 10 0 . The multi-use Booster injector requires several very different standard magnet cycles, capable of instantaneous interchange using computer control from dc up to 10 Hz

  13. Cockroft Walton accelerator prototype

    International Nuclear Information System (INIS)

    Hutapea, Sumihar.

    1976-01-01

    Prototype of a Cockroft Walton generator using ceramic and plastic capacitors is discussed. Compared to the previous generator, the construction and components are much more improved. Pralon is used for the high voltage insulation column and plastic is used as a dielectric material for the high voltage capacitor. Cockroft Walton generator is used as a high tension supply for an accelerator. (author)

  14. Prompt and Precise Prototyping

    Science.gov (United States)

    2003-01-01

    For Sanders Design International, Inc., of Wilton, New Hampshire, every passing second between the concept and realization of a product is essential to succeed in the rapid prototyping industry where amongst heavy competition, faster time-to-market means more business. To separate itself from its rivals, Sanders Design aligned with NASA's Marshall Space Flight Center to develop what it considers to be the most accurate rapid prototyping machine for fabrication of extremely precise tooling prototypes. The company's Rapid ToolMaker System has revolutionized production of high quality, small-to-medium sized prototype patterns and tooling molds with an exactness that surpasses that of computer numerically-controlled (CNC) machining devices. Created with funding and support from Marshall under a Small Business Innovation Research (SBIR) contract, the Rapid ToolMaker is a dual-use technology with applications in both commercial and military aerospace fields. The advanced technology provides cost savings in the design and manufacturing of automotive, electronic, and medical parts, as well as in other areas of consumer interest, such as jewelry and toys. For aerospace applications, the Rapid ToolMaker enables fabrication of high-quality turbine and compressor blades for jet engines on unmanned air vehicles, aircraft, and missiles.

  15. Surrogates-based prototyping

    NARCIS (Netherlands)

    Du Bois, E.; Horvath, I.

    2014-01-01

    The research is situated in the system development phase of interactive software products. In this detailed design phase, we found a need for fast testable prototyping to achieve qualitative change proposals on the system design. In this paper, we discuss a literature study on current software

  16. Z Andromedae: the prototype

    International Nuclear Information System (INIS)

    Viotti, R.; Giangrande, A.; Ricciardi, O.; Cassatella, A.

    1982-01-01

    Z And is considered as the ''prototype'' of the symbiotic stars. Besides its symbiotic spectrum, the star is also known for its characteristic light curve (and for the related spectral variations). Since many theoretical speculations on Z And and similar objects have been based on the luminosity and spectral variations of this star, the authors critically analyse the observational data concerning it. (Auth.)

  17. Prototype ATLAS straw tracker

    CERN Multimedia

    Laurent Guiraud

    1998-01-01

    This is an early prototype of the straw tracking device for the ATLAS detector at CERN. This detector will be part of the LHC project, scheduled to start operation in 2008. The straw tracker will consist of thousands of gas-filled straws, each containing a wire, allowing the tracks of particles to be followed.

  18. Orbitmpi Documentation

    International Nuclear Information System (INIS)

    Lowe, Lisa L.

    2000-01-01

    Orbitmpi is a parallelized version of Roscoe White's Orbit code. The code has been parallelized using MPI, which makes it portable to many types of machines. The guidelines used for the parallelization were to increase code performance with minimal changes to the code's original structure. This document gives a general description of how the parallel sections of the code run. It discusses the changes made to the original code and comments on the general procedure for future additions to Orbitmpi, as well as describing the effects of a parallelized random number generator on the code's output. Finally, the scaling results from Hecate and from Puffin are presented. Hecate is a 64-processor Origin 2000 machine, with MIPS R12000 processors and 16GB of memory, and Puffin is a PC cluster with 9 dual-processor 450 MHz Pentium III (18 processors max.), with 100Mbits ethernet communication

  19. Orifice jet brazing process development, qualification, and initial application

    International Nuclear Information System (INIS)

    1971-05-01

    Experiments were carried out to develop acceptable procedures for brazing molybdenum alloy orifices to fuel element channel inlets of the NERVA R-1 reactor core. Results achieved with various procedures are described, and qualification tests of the selected process are documented. The recommended procedure includes preplacing of Au-Ni-Cr alloy washers and induction heating to 1600 0 F, holding two minutes, heating further to 2400 0 F, holding one minute, and allowing to cool. Inert atmosphere is used, and fixturing maintains proper positioning of the orifices. Leak testing of the joints has demonstrated reproducibly satisfactory sealing. Repair brazing is feasible if needed. (auth)

  20. Hybrid Qualifications Country report Denmark

    DEFF Research Database (Denmark)

    Jørgensen, Christian Helms

    2010-01-01

    The report explores the institutional and functional relations between the higher education (tertiary sector) and vocational education (higher secondary education) and the labour market. In the report are included descriptions of the history, funding, outcomes, institutional realisation and term ...... and range of hybrid qualifications in the national system. In addition some recommendations for constructive further developments are given.......The report explores the institutional and functional relations between the higher education (tertiary sector) and vocational education (higher secondary education) and the labour market. In the report are included descriptions of the history, funding, outcomes, institutional realisation and term...

  1. The qualification of reactor operators

    International Nuclear Information System (INIS)

    Lima, J.M. de; Soares, H.V.

    1981-01-01

    The qualification and performance of nuclear power personnel have an important influence on the availability and safety operation of these plants. This paper describes the Brazilian rules and norms established by the CNEN-Brazilian Atomic Energy Comission, as well as policy of other countries concerning training requirements and experiences of nuclear power reactor operators. Some coments are made about the im pact of the march 1979 Three Mile Island accident on upgrading the reactor training requirements in U.S.A. and its international implication. (Author) [pt

  2. Appearance, discrimination, and reaction qualifications

    OpenAIRE

    Mason, Andrew

    2016-01-01

    When are selectors for advantaged social positions morally justified in giving weight to the appearance of the candidates? In order to address this issue adequately, we need to know when a person’s appearance can be a legitimate qualification for a position. Some of the hardest cases are jobs that involve interacting with clients or customers who prefer to deal with good-looking employees or who respond more favourably to them. But there is also a wide range of difficult cases in which an unc...

  3. Review of qualifications for fuel assembly fabrication

    International Nuclear Information System (INIS)

    Slabu, Dan; Zemek, Martin; Hellwig, Christian

    2013-01-01

    The required quality of nuclear fuel in industrial production can only be assured by applying processes in fabrication and inspection, which are well mastered and have been proven by an appropriate qualification. The present contribution shows the understanding and experiences of Axpo with respect to qualifications in the frame of nuclear fuel manufacturing and reflects some related expectations of the operator. (orig.)

  4. Qualification tests for a dosimetry system

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The report of qualification tests for personnel dosemeters is detailed. Qualification test for the energy response and the incidence angle is given. The procedure of test is resumed. Different coefficients of conversion used in these tests are given in tables. (N.C.)

  5. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  6. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  7. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  8. Qualification test of a main coolant pump for SMART pilot

    International Nuclear Information System (INIS)

    Park, Sang Jin; Yoon, Eui Soo; Oh, Hyong Woo

    2006-01-01

    SMART Pilot is a multipurpose small capacity integral type reactor. Main Coolant Pump (MCP) of SMART Pilot is a canned-motor-type axial pump to circulate the primary coolant between nuclear fuel and steam generator in the primary system. The reactor is designed to operate under condition of 310 .deg. C and 14.7 MPa. Thus MCP has to be tested under same operating condition as reactor design condition to verify its performance and safety. In present work, a test apparatus to simulate real operating situations of the reactor has been designed and constructed to test MCP. And then functional tests, performance tests, and endurance tests have been carried out upon a prototype MCP. Canned motor characteristics, homologous head/torque curves, coast-down curves, NPSH curves and life-time performance variations were obtained from the qualification test as well as hydraulic performance characteristics of MCP

  9. Let Documents Talk to Each Other: A Computer Model for Connection of Short Documents.

    Science.gov (United States)

    Chen, Z.

    1993-01-01

    Discusses the integration of scientific texts through the connection of documents and describes a computer model that can connect short documents. Information retrieval and artificial intelligence are discussed; a prototype system of the model is explained; and the model is compared to other computer models. (17 references) (LRW)

  10. Methods Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Alessi, R. Sam; Grimmett, Tami; Vang, Leng; McGrath, Dave

    2010-01-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V and V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  11. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  12. CMS DOCUMENTATION

    CERN Multimedia

    CMS TALKS AT MAJOR MEETINGS The agenda and talks from major CMS meetings can now be electronically accessed from the ICMS Web site. The following items can be found on: http://cms.cern.ch/iCMS Management – CMS Weeks (Collaboration Meetings), CMS Weeks Agendas The talks presented at the Plenary Sessions. Management – CB – MB – FB Agendas and minutes are accessible to CMS members through Indico. LHCC The talks presented at the ‘CMS Meetings with LHCC Referees’ are available on request from the PM or MB Country Representative. Annual Reviews The talks presented at the 2008 Annual Reviews are posted in Indico. CMS DOCUMENTS It is considered useful to establish information on the first employment of CMS doctoral student upon completion of their theses.  Therefore it is requested that Ph.D students inform the CMS Secretariat about the nature of employment and name of their first employer. The Notes, Conference Reports and Theses published si...

  13. Training and qualification program for nuclear criticality safety technical staff. Revision 1

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1997-01-01

    A training and qualification program for nuclear criticality safety technical staff personnel has been developed and implemented. All personnel who are to perform nuclear criticality safety technical work are required to participate in the program. The program includes both general nuclear criticality safety and plant specific knowledge components. Advantage can be taken of previous experience for that knowledge which is portable such as performance of computer calculations. Candidates step through a structured process which exposes them to basic background information, general plant information, and plant specific information which they need to safely and competently perform their jobs. Extensive documentation is generated to demonstrate that candidates have met the standards established for qualification

  14. Qualification of a production and packaging hot cell for sodium pertechnetate Tc 99m

    International Nuclear Information System (INIS)

    Cavero, Luis; Robles, Anita; Miranda, Jesus; Martinez, Ramos; Paragulla, Wilson; Moore, Mariel; Herrera, Jorge; Ocana, Elias; Portilla, Arturo; Otero, Manuel; Novoa, Carlos; Koga, Roberto

    2014-01-01

    It was designed and implemented a protocol for a hot cell of production and packaging of sodium pertechnetate Tc 99m, in a two-step process: installation qualification (IQ) and operation qualification (OQ). In the IQ design specifications and user requirements and associated equipment and materials by traceable documentation was verified. In the OQ scheduled for operation and control sequences it was verified plus operational tests recommended by the World Health Organization (WHO) and ISO 14644-1 and 3 were performed to clean areas. The results showed that the hot cell complies with the classification for Grades C and A for the preparation and packaging of Tc 99m. (authors).

  15. Qualification of PHT piping of Indian 500 MW PHWR for LBB, using R-6 method

    International Nuclear Information System (INIS)

    Rastogi, Rohit; Bhasin, V.; Kushwaha, H.S.

    1997-01-01

    This document discusses the qualification of straight pipe portion of the primary heat transport (PHT) piping of Indian 500 MWe pressurised heavy water reactor (PHWR) for leak before break (LBB). The evaluation is done using R-6 [1] method. The results presented here are: the safety margins which exist on straight pipe components of main PHT piping of 500 MWe, under leakage size crack (LSC) and design basis accident loads; the sensitivity of safety margins with respect to different analysis parameters and the qualification of PHT piping for LBB based on criterion given by NUREG-1061 [2] and TECDOC-774 [3]. (author)

  16. Database Replication Prototype

    OpenAIRE

    Vandewall, R.

    2000-01-01

    This report describes the design of a Replication Framework that facilitates the implementation and com-parison of database replication techniques. Furthermore, it discusses the implementation of a Database Replication Prototype and compares the performance measurements of two replication techniques based on the Atomic Broadcast communication primitive: pessimistic active replication and optimistic active replication. The main contributions of this report can be split into four parts....

  17. Brachial Plexus Blocker Prototype

    OpenAIRE

    Stéphanie Coelho Monteiro

    2017-01-01

    Although the area of surgical simulation has been the subject of study in recent years, it is still necessary to develop artificial experimental models with a perspective to dismiss the use of biological models. Since this makes the simulators more real, transferring the environment of the health professional to a physical or virtual reality, an anesthetic prototype has been developed, where the motor response is replicated when the brachial plexus is subjected to a proximal nervous stimulus....

  18. Omega documentation

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, R.J.; Dye, R.E.; Giles, P.C.; Kimlinger, J.R.; Perkins, S.T.; Plechaty, E.F.

    1983-08-01

    OMEGA is a CRAY I computer program that controls nine codes used by LLNL Physical Data Group for: 1) updating the libraries of evaluated data maintained by the group (UPDATE); 2) calculating average values of energy deposited in secondary particles and residual nuclei (ENDEP); 3) checking the libraries for internal consistency, especially for energy conservation (GAMCHK); 4) producing listings, indexes and plots of the library data (UTILITY); 5) producing calculational constants such as group averaged cross sections and transfer matrices for diffusion and Sn transport codes (CLYDE); 6) producing and updating standard files of the calculational constants used by LLNL Sn and diffusion transport codes (NDFL); 7) producing calculational constants for Monte Carlo transport codes that use group-averaged cross sections and continuous energy for particles (CTART); 8) producing and updating standard files used by the LLNL Monte Carlo transport codes (TRTL); and 9) producing standard files used by the LANL pointwise Monte Carlo transport code MCNP (MCPOINT). The first four of these functions and codes deal with the libraries of evaluated data and the last five with various aspects of producing calculational constants for use by transport codes. In 1970 a series, called PD memos, of internal and informal memoranda was begun. These were intended to be circulated among the group for comment and then to provide documentation for later reference whenever questions arose about the subject matter of the memos. They have served this purpose and now will be drawn upon as source material for this more comprehensive report that deals with most of the matters covered in those memos.

  19. Omega documentation

    International Nuclear Information System (INIS)

    Howerton, R.J.; Dye, R.E.; Giles, P.C.; Kimlinger, J.R.; Perkins, S.T.; Plechaty, E.F.

    1983-08-01

    OMEGA is a CRAY I computer program that controls nine codes used by LLNL Physical Data Group for: 1) updating the libraries of evaluated data maintained by the group (UPDATE); 2) calculating average values of energy deposited in secondary particles and residual nuclei (ENDEP); 3) checking the libraries for internal consistency, especially for energy conservation (GAMCHK); 4) producing listings, indexes and plots of the library data (UTILITY); 5) producing calculational constants such as group averaged cross sections and transfer matrices for diffusion and Sn transport codes (CLYDE); 6) producing and updating standard files of the calculational constants used by LLNL Sn and diffusion transport codes (NDFL); 7) producing calculational constants for Monte Carlo transport codes that use group-averaged cross sections and continuous energy for particles (CTART); 8) producing and updating standard files used by the LLNL Monte Carlo transport codes (TRTL); and 9) producing standard files used by the LANL pointwise Monte Carlo transport code MCNP (MCPOINT). The first four of these functions and codes deal with the libraries of evaluated data and the last five with various aspects of producing calculational constants for use by transport codes. In 1970 a series, called PD memos, of internal and informal memoranda was begun. These were intended to be circulated among the group for comment and then to provide documentation for later reference whenever questions arose about the subject matter of the memos. They have served this purpose and now will be drawn upon as source material for this more comprehensive report that deals with most of the matters covered in those memos

  20. Prototyping real-time systems

    OpenAIRE

    Clynch, Gary

    1994-01-01

    The traditional software development paradigm, the waterfall life cycle model, is defective when used for developing real-time systems. This thesis puts forward an executable prototyping approach for the development of real-time systems. A prototyping system is proposed which uses ESML (Extended Systems Modelling Language) as a prototype specification language. The prototyping system advocates the translation of non-executable ESML specifications into executable LOOPN (Language of Object ...

  1. MITRE sensor layer prototype

    Science.gov (United States)

    Duff, Francis; McGarry, Donald; Zasada, David; Foote, Scott

    2009-05-01

    The MITRE Sensor Layer Prototype is an initial design effort to enable every sensor to help create new capabilities through collaborative data sharing. By making both upstream (raw) and downstream (processed) sensor data visible, users can access the specific level, type, and quantities of data needed to create new data products that were never anticipated by the original designers of the individual sensors. The major characteristic that sets sensor data services apart from typical enterprise services is the volume (on the order of multiple terabytes) of raw data that can be generated by most sensors. Traditional tightly coupled processing approaches extract pre-determined information from the incoming raw sensor data, format it, and send it to predetermined users. The community is rapidly reaching the conclusion that tightly coupled sensor processing loses too much potentially critical information.1 Hence upstream (raw and partially processed) data must be extracted, rapidly archived, and advertised to the enterprise for unanticipated uses. The authors believe layered sensing net-centric integration can be achieved through a standardize-encapsulate-syndicateaggregate- manipulate-process paradigm. The Sensor Layer Prototype's technical approach focuses on implementing this proof of concept framework to make sensor data visible, accessible and useful to the enterprise. To achieve this, a "raw" data tap between physical transducers associated with sensor arrays and the embedded sensor signal processing hardware and software has been exploited. Second, we encapsulate and expose both raw and partially processed data to the enterprise within the context of a service-oriented architecture. Third, we advertise the presence of multiple types, and multiple layers of data through geographic-enabled Really Simple Syndication (GeoRSS) services. These GeoRSS feeds are aggregated, manipulated, and filtered by a feed aggregator. After filtering these feeds to bring just the type

  2. Development and Analysis of Desiccant Enhanced Evaporative Air Conditioner Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Kozubal, E.; Woods, J.; Judkoff, R.

    2012-04-01

    This report documents the design of a desiccant enhanced evaporative air conditioner (DEVAP AC) prototype and the testing to prove its performance. Previous numerical modeling and building energy simulations indicate a DEVAP AC can save significant energy compared to a conventional vapor compression AC (Kozubal et al. 2011). The purposes of this research were to build DEVAP prototypes, test them to validate the numerical model, and identify potential commercialization barriers.

  3. SIMS prototype system 1 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The space and domestic water solar heating system designated SIMS Prototype Systems 1 was evaluated. The test system used 720 ft (gross) of Solar Energy Products Air Collectors, a Solar Control Corporation SAM 20 Air Handler with Model 75-175 control unit, a Jackson Solar Storage tank with Rho Sigma Mod 106 controller, and 20 tons of rack storage. The test data analysis performed evaluates the system performance and documents the suitability of SIMS Prototype System 1 hardware for field installation.

  4. A prototype analysis of vengeance

    NARCIS (Netherlands)

    Elshout, Maartje; Nelissen, Rob; van Beest, Ilja

    2015-01-01

    The authors examined the concept of vengeance from a prototype perspective. In 6 studies, the prototype structure of vengeance was mapped. Sixty-nine features of vengeance were identified (Study 1), and rated on centrality (Study 2). Further studies confirmed the prototype structure. Compared to

  5. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  6. 5 CFR 302.403 - Qualifications for promotion.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications for promotion. 302.403... EMPLOYMENT IN THE EXCEPTED SERVICE Selection and Appointment; Reappointment; and Qualifications for Promotion § 302.403 Qualifications for promotion. In determining qualifications for promotion with respect to an...

  7. 49 CFR 180.507 - Qualification of tank cars.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Qualification of tank cars. 180.507 Section 180... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used...

  8. The HTR modular power reactor system. Qualification of fuel elements and materials

    International Nuclear Information System (INIS)

    Heidenreich, U.; Breitling, H.; Nieder, R.; Ohly, W.; Mittenkuehler, A.; Ragoss, H.; Seehafer, H.J.; Wirtz, K.; Serafin, N.

    1989-01-01

    For further development of the HTR modular power reactor system (HTR-M-KW), the project activities for 'Qualification of fuel elements and materials' reported here cover the work for specifying the qualifications to be met by metallic and ceramic materials, taking into account the design-based requirements and the engineered safety requirements. The fission product retention data determined for the HTR modular reactor fuel elements could be better confirmed by evaluation of the experiments, and have been verified by various calculation methods for different operating conditions. The qualification of components was verified by strength analyses including a benchmark calculation for specified normal operation and emergencies; the results show a convenient behaviour of the components and their materials. In addition, a fuel element burnup measuring system was designed that applies Cs-137 gamma spectroscopy; its feasibility was checked by appropriate analyses, and qualification work is in progress. The installation of a prototype measurement system is the task for project No. 03 IAT 211. (orig.) [de

  9. TEACHERS’ EDUCATIONAL QUALIFICATION, RANK LEVEL, WORKING DURATION, AGE, WORK MOTIVATION AND WORK EFFECTIVENESS

    Directory of Open Access Journals (Sweden)

    Bambang Budi Wiyono

    2016-02-01

    Full Text Available Teachers’ Educational Qualification, Rank Level, Working Duration, Age, Working Mo­tivation, and Working Effectiveness The study investigated the effects of educational qualification, rank level, working duration and age on the elementary school teachers’ working motivation and working ef­fectiveness. The sample of the study consisted of 438 elementary school teachers in Malang which were selected through cluster sampling technique. The study was conducted using explanatory design in the form of causal model. The data were collected using questionnaire and documentation, and were analyzed descrip­tively employing structural equation technique. The study revealed that that the effect of the educational qualification, rank level, working duration and age on teachers’ working motivation and working effec­tiveness, both directly and indirectly, was not significant.

  10. Methods for qualification of highly reliable software - international procedure

    International Nuclear Information System (INIS)

    Kersken, M.

    1997-01-01

    Despite the advantages of computer-assisted safety technology, there still is some uneasyness to be observed with respect to the novel processes, resulting from absence of a body of generally accepted and uncontentious qualification guides (regulatory provisions, standards) for safety evaluation of the computer codes applied. Warranty of adequate protection of the population, operators or plant components is an essential aspect in this context, too - as it is in general with reliability and risk assessment of novel technology - so that, due to appropriate legislation still missing, there currently is a licensing risk involved in the introduction of digital safety systems. Nevertheless, there is some extent of agreement within the international community and utility operators about what standards and measures should be applied for qualification of software of relevance to plant safety. The standard IEC 880/IEC 86/ in particular, in its original version, or national documents based on this standard, are applied in all countries using or planning to install those systems. A novel supplement to this standard, document /IEC 96/, is in the process of finalization and defines the requirements to be met by modern methods of software engineering. (orig./DG) [de

  11. Nuclear security personnel for power plants. Content and review procedures for a security training and qualification program

    International Nuclear Information System (INIS)

    1978-06-01

    The applicant and licensee training and qualification plans will outline the process by which guard, watchman, armed response persons and other members of the security organization will be selected, trained, equipped and qualified. This plan should contain: (1) job descriptions for all security positions; (2) duties defined for all positions; (3) critical tasks defined for all duties; (4) skills, knowledge and abilities defined for all critical tasks; (5) performance objectives stated for all critical tasks; and (6) training and qualification plans to train and test to appropriate performance objectives. The document gives guidance on the preparation of this training and qualification plan and contains three parts: (1) an introduction to and brief explanation of job analysis and performance objectives; (2) a statement of the information that should be submitted in response to the requirements and the NRR review procedures; and (3) a sample qualification submittal

  12. Training and qualification of inspectors

    International Nuclear Information System (INIS)

    Aro, I.; Anderson, R.; Ericsson, P.O.; Lee, I.

    1993-01-01

    A total of four workshop breakout sessions were conducted on this subject: one double session and three single sessions. The following discussion describes common points and difference among the countries in the areas of inspector training and qualifications. In most countries there are resident or non-resident site-specific inspectors who have general plant supervision duties. In addition, there are specialized inspectors who visit NPP when requested or according to the scheduled inspection program. Most countries try to recruit experienced personnel. Many countries prefer to have candidates who have extensive plant experience. Some countries do not recruit inspectors from utilities because of potential conflict of interest or credibility reasons. In many countries, the typical training time to become an independent inspector is one year. In some countries an inspector is formally certified after their training period and completion of an examination

  13. VHDL basics applied design by SIPAC qualification system

    International Nuclear Information System (INIS)

    Park, In Ha; Mun, Da Cheol; Lee, Gwang Yeob

    2005-12-01

    This book has six chapters, which are about Flowrian of SIPAC qualification system including internet CAD system and remote server service, logic circuit on design and qualification of device such as gate circuit, multiplex and decoder, order logic circuit with D type flip-flop design and qualification and Rom and RAM's design and qualification, finite state machine such as odd checker, sequence detector, test clock generator and traffic light controller, design and qualification about data path, design of application circuit. It has two appendixes on install and the way to use SIPAC qualification system and remote service for SIPAC qualification system.

  14. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  15. Solar array qualification through qualified analysis

    Science.gov (United States)

    Zijdemans, J.; Cruijssen, H. J.; Wijker, J. J.

    1991-04-01

    To achieve qualification is in general a very expensive exercise. For solar arrays this is done by a dedicated test program through which final qualification is achieved. Due to severe competition on the solar array market, cheaper means are looked for to achieve a qualified product for the customers. One of the methods is to drastically limit the environmental test program and to qualify the solar-array structure against its environmental loads by analysis. Qualification by analysis is possible. The benefits are that a significant amount of development effort can be saved in case such a powerful tool is available. Extensive testing can be avoided thus saving time and money.

  16. QUALIFICATIONS FRAMEWORK DEVELOPMENT AND QUALIFICATIONS RATING IN THE LAND MANAGEMENT SPHERE

    Directory of Open Access Journals (Sweden)

    A. A. Myrasheva

    2014-01-01

    Full Text Available The aim of the research is to observe the existing approaches to qualifications framework development in the sphere of land management, cadastres and real estate management, as well as the qualifications framework adaptation to European system. The relevance of the issue is related to the specific professional and institutional problems facing Russian educational establishments engaged in personnel training in the given sphere. The authors demonstrate the qualifications framework development in the land management sector regarding it as a key mechanism of educational mobility and the router for knowledge acquisition and updates. The qualifications framework is referred to as a systematic and structured description of recognized qualifications. The accepted worldwide methodology of organizing the educational process and quality control system is given. The emphasis is on the need to comply the qualifications framework with the Russian State Educational Standards.

  17. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  18. OPAL Jet Chamber Prototype

    CERN Multimedia

    OPAL was one of the four experiments installed at the LEP particle accelerator from 1989 - 2000. OPAL's central tracking system consists of (in order of increasing radius) a silicon microvertex detector, a vertex detector, a jet chamber, and z-chambers. All the tracking detectors work by observing the ionization of atoms by charged particles passing by: when the atoms are ionized, electrons are knocked out of their atomic orbitals, and are then able to move freely in the detector. These ionization electrons are detected in the dirfferent parts of the tracking system. This piece is a prototype of the jet chambers

  19. Prototyping Augmented Reality

    CERN Document Server

    Mullen, Tony

    2011-01-01

    Learn to create augmented reality apps using Processing open-source programming language Augmented reality (AR) is used all over, and you may not even realize it. Smartphones overlay data onto live camera views to show homes for sale, restaurants, or historical sites. American football broadcasts use AR to show the invisible first-down line on the field to TV viewers. Nike and Budweiser, among others, have used AR in ads. Now, you can learn to create AR prototypes using 3D data, Processing open-source programming language, and other languages. This unique book is an easy-to-follow guide on how

  20. Estimations on uranium silicide fuel prototypes for their irradiation and postirradiation

    International Nuclear Information System (INIS)

    Sbaffoni, Maria M.

    2000-01-01

    The 'Silicide' project includes the qualification of this type of research reactor fuel to be used i.e. in the Argentine RA-3 and to confirm CNEA's role as an international supplier. The present paper shows complementary basic information for P-04 prototype post-irradiation, which is already under way, and some parameter values related to the new P-06 prototype to be taken into account for planning its irradiation and post-irradiation. The reliability of these values has been evaluated through comparison with experimental results. The reported results contribute, also, to a parallel study on the nuclear data libraries used in calculations for this type of reactor. (author)

  1. Worthwhile optical method for free-form mirrors qualification

    Science.gov (United States)

    Sironi, G.; Canestrari, R.; Toso, G.; Pareschi, G.

    2013-09-01

    We present an optical method for free-form mirrors qualification developed by the Italian National Institute for Astrophysics (INAF) in the context of the ASTRI (Astrofisica con Specchi a Tecnologia Replicante Italiana) Project which includes, among its items, the design, development and installation of a dual-mirror telescope prototype for the Cherenkov Telescope Array (CTA) observatory. The primary mirror panels of the telescope prototype are free-form concave mirrors with few microns accuracy required on the shape error. The developed technique is based on the synergy between a Ronchi-like optical test performed on the reflecting surface and the image, obtained by means of the TraceIT ray-tracing proprietary code, a perfect optics should generate in the same configuration. This deflectometry test allows the reconstruction of the slope error map that the TraceIT code can process to evaluate the measured mirror optical performance at the telescope focus. The advantages of the proposed method is that it substitutes the use of 3D coordinates measuring machine reducing production time and costs and offering the possibility to evaluate on-site the mirror image quality at the focus. In this paper we report the measuring concept and compare the obtained results to the similar ones obtained processing the shape error acquired by means of a 3D coordinates measuring machine.

  2. Visas and qualifications: Syrian refugees in Brazil

    Directory of Open Access Journals (Sweden)

    Gilberto M A Rodrigues

    2017-10-01

    Full Text Available Brazil’s humanitarian visa programme for Syrian refugees and its efforts to recognise their qualifications could offer lessons for refugee protection and integration across the region.

  3. Qualification of anticorrosive coatings in nuclear vessels

    International Nuclear Information System (INIS)

    Perez Flores, C.

    1985-01-01

    Test qualifications of the behavior of anticorrosive coating systems used in nuclear vessels in service and under the accident conditions of radiation decontamination, steam chemical resistance, thermal conductivity, weathering accelerated aging are presented and discussed. (author)

  4. Sport Management Interns--Selection Qualifications.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1993-01-01

    Examines and rates the background qualifications and qualities, identified by sport management practitioners through an examination of paper credentials, that are desired in interviewees vying for selection into sport management internship positions. (GLR)

  5. Appointment, qualifications and responsibilities of ventilation officers

    International Nuclear Information System (INIS)

    1981-01-01

    The Code provides for the appointment of a ventilation officer when required by the appropriate authority. This guideline offers comment on the appointment, qualifications, training and responsibilities of that person

  6. Qualification and testing of CT systems

    DEFF Research Database (Denmark)

    Bartscher, Markus; Neuschaefer-Rube, Ulrich; Illemann, Jens

    2018-01-01

    This chapter focuses on system verification and conformance to specifications. System qualification is carried out to ensure that the system and itscomponents achieve the best performance—usually corresponding to the specificationsmade by the manufacturer. Acceptance and reverification testing ar...

  7. Emergency Management. Functional Area Qualification Standard

    National Research Council Canada - National Science Library

    2004-01-01

    .... In support of this goal, the competency requirements defined in the Technical Qualification Standards should be aligned with and integrated into the recruitment and staffing processes for technical positions...

  8. Materials qualification for nuclear power plants

    International Nuclear Information System (INIS)

    Braconi, F.

    1987-01-01

    The supply of materials to be used in the fabrication of components submitted to pressure destined to Atucha II nuclear power plant must fulfill the quality assurance requirements in accordance with the international standards. With the aim of promoting the national participation in CNA II, ENACE had the need to adapt these requirements to the national industry conditions and to the availability of official entities' qualification and inspection. As a uniform and normalized assessment for the qualification of materials did not exist in the country, ENACE had to develop a materials suppliers qualification system. This paper presents a suppliers qualification procedure, its application limits and the alternative procedures for the acceptance of individual stock and for the stock materials purchase. (Author)

  9. Qualification of organizations for independent technical supervision

    International Nuclear Information System (INIS)

    1981-04-01

    The requirements are established on trial for the qualification of an organization as an independent technical supervision organization in nuclear facilities, in activities related with quality assurance programs. (I.C.R.) [pt

  10. DataCollection Prototyping

    CERN Multimedia

    Beck, H.P.

    DataCollection is a subsystem of the Trigger, DAQ & DCS project responsible for the movement of event data from the ROS to the High Level Triggers. This includes data from Regions of Interest (RoIs) for Level 2, building complete events for the Event Filter and finally transferring accepted events to Mass Storage. It also handles passing the LVL1 RoI pointers and the allocation of Level 2 processors and load balancing of Event Building. During the last 18 months DataCollection has developed a common architecture for the hardware and software required. This involved a radical redesign integrating ideas from separate parts of earlier TDAQ work. An important milestone for this work, now achieved, has been to demonstrate this subsystem in the so-called Phase 2A Integrated Prototype. This prototype comprises the various TDAQ hardware and software components (ROSs, LVL2, etc.) under the control of the TDAQ Online software. The basic functionality has been demonstrated on small testbeds (~8-10 processing nodes)...

  11. OMS FDIR: Initial prototyping

    Science.gov (United States)

    Taylor, Eric W.; Hanson, Matthew A.

    1990-01-01

    The Space Station Freedom Program (SSFP) Operations Management System (OMS) will automate major management functions which coordinate the operations of onboard systems, elements and payloads. The objectives of OMS are to improve safety, reliability and productivity while reducing maintenance and operations cost. This will be accomplished by using advanced automation techniques to automate much of the activity currently performed by the flight crew and ground personnel. OMS requirements have been organized into five task groups: (1) Planning, Execution and Replanning; (2) Data Gathering, Preprocessing and Storage; (3) Testing and Training; (4) Resource Management; and (5) Caution and Warning and Fault Management for onboard subsystems. The scope of this prototyping effort falls within the Fault Management requirements group. The prototyping will be performed in two phases. Phase 1 is the development of an onboard communications network fault detection, isolation, and reconfiguration (FDIR) system. Phase 2 will incorporate global FDIR for onboard systems. Research into the applicability of expert systems, object-oriented programming, fuzzy sets, neural networks and other advanced techniques will be conducted. The goals and technical approach for this new SSFP research project are discussed here.

  12. Live Piloting and Prototyping

    Directory of Open Access Journals (Sweden)

    Francesca Rizzo

    2013-07-01

    Full Text Available This paper presents current trends in service design research concerning large scale projects aimed at generating changes at a local scale. The strategy adopted to achieve this, is to co-design solutions including future users in the development process, prototyping and testing system of products and services before their actual implementation. On the basis of experience achieved in the European Project Life 2.0, this paper discusses which methods and competencies are applied in the development of these projects, eliciting the lessons learnt especially from the piloting phase in which the participatory design (PD approach plays a major role. In the first part, the topic is introduced jointly with the theoretical background where the user center design and participatory design methods are presented; then the Life 2.0 project development is described; finally the experience is discussed from a service design perspective, eliciting guidelines for piloting and prototyping services in a real context of use. The paper concludes reflecting on the designers’ role and competencies needed in this process.

  13. Applying Hypertext Structures to Software Documentation.

    Science.gov (United States)

    French, James C.; And Others

    1997-01-01

    Describes a prototype system for software documentation management called SLEUTH (Software Literacy Enhancing Usefulness to Humans) being developed at the University of Virginia. Highlights include information retrieval techniques, hypertext links that are installed automatically, a WAIS (Wide Area Information Server) search engine, user…

  14. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  15. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  16. Qualification of safety-related valve actuators

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This Standard describes the qualification of all types of power-driven valve actuators, including damper actuators, for safety-related functions in nuclear power generating stations. It may also be used to separately qualify actuator components. This Standard establishes the minimum requirements for, and guidance regarding, the methods and procedures for qualification of all safety-related functions of power-driven valve actuators

  17. Assessing mathematics within advanced school science qualifications

    OpenAIRE

    McAlinden, Mary; Noyes, Andrew

    2017-01-01

    Following sustained discussion regarding the relationship between advanced mathematics and science learning in England, the government has pursued a reform agenda in which mathematics is embedded in national, high stakes A-level science qualifications and their assessments for 18-year-olds. For example, A-level Chemistry must incorporate the assessment of relevant mathematics for at least 20% of the qualification. Other sciences have different mandated percentages. This embedding policy is ru...

  18. Waste Acceptance System Requirements document (WASRD)

    International Nuclear Information System (INIS)

    1993-01-01

    This Waste Acceptance System Requirements document (WA-SRD) describes the functions to be performed and the technical requirements for a Waste Acceptance System for accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) into the Civilian Radioactive Waste Management System (CRWMS). This revision of the WA-SRD addresses the requirements for the acceptance of HLW. This revision has been developed as a top priority document to permit DOE's Office of Environmental Restoration and Waste Management (EM) to commence waste qualification runs at the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) in a timely manner. Additionally, this revision of the WA-SRD includes the requirements from the Physical System Requirements -- Accept Waste document for the acceptance of SNF. A subsequent revision will fully address requirements relative to the acceptance of SNF

  19. Prototypes as Platforms for Participation

    DEFF Research Database (Denmark)

    Horst, Willem

    developers, and design it accordingly. Designing a flexible prototype in combination with supportive tools to be used by both interaction designers and non-designers during development is introduced as a way to open up the prototyping process to these users. Furthermore I demonstrate how such a flexible...... on prototyping, by bringing to attention that the prototype itself is an object of design, with its users and use context, which deserves further attention. Moreover, in this work I present concrete tools and methods that can be used by interaction designers in practice. As such this work addresses both......The development of interactive products in industry is an activity involving different disciplines – such as different kinds of designers, engineers, marketers and managers – in which prototypes play an important role. On the one hand, prototypes can be powerful boundary objects and an effective...

  20. Prototype Stilbene Neutron Collar

    Energy Technology Data Exchange (ETDEWEB)

    Prasad, M. K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Shumaker, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Snyderman, N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Verbeke, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wong, J. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-10-26

    A neutron collar using stilbene organic scintillator cells for fast neutron counting is described for the assay of fresh low enriched uranium (LEU) fuel assemblies. The prototype stilbene collar has a form factor similar to standard He-3 based collars and uses an AmLi interrogation neutron source. This report describes the simulation of list mode neutron correlation data on various fuel assemblies including some with neutron absorbers (burnable Gd poisons). Calibration curves (doubles vs 235U linear mass density) are presented for both thermal and fast (with Cd lining) modes of operation. It is shown that the stilbene collar meets or exceeds the current capabilities of He-3 based neutron collars. A self-consistent assay methodology, uniquely suited to the stilbene collar, using triples is described which complements traditional assay based on doubles calibration curves.

  1. Brachial Plexus Blocker Prototype

    Directory of Open Access Journals (Sweden)

    Stéphanie Coelho Monteiro

    2017-08-01

    Full Text Available Although the area of surgical simulation has been the subject of study in recent years, it is still necessary to develop artificial experimental models with a perspective to dismiss the use of biological models. Since this makes the simulators more real, transferring the environment of the health professional to a physical or virtual reality, an anesthetic prototype has been developed, where the motor response is replicated when the brachial plexus is subjected to a proximal nervous stimulus. Using action-research techniques, with this simulator it was possible to validate that the human nerve response can be replicated, which will aid the training of health professionals, reducing possible risks in a surgical environment.

  2. 1968 Prototype Diagnostic Test.

    Science.gov (United States)

    Veterans Administration Hospital, Bedford, MA.

    This true-false diagnostic test was used for pretesting of employees at a Veterans Administration Hospital. The test is comprised of 20 items. An alternate test--Classification Questionnaire--was used for testing after remedial training. (For related document, see TM 002 334.) (DB)

  3. Naval Prototype Optical Interferometer (NPOI)

    Data.gov (United States)

    Federal Laboratory Consortium — FUNCTION: Used for astrometry and astronomical imaging, the Naval Prototype Optical Interferometer (NPOI) is a distributed aperture optical telescope. It is operated...

  4. Mobile prototyping with Axure 7

    CERN Document Server

    Hacker, Will

    2013-01-01

    This book is a step-by-step tutorial which includes hands-on examples and downloadable Axure files to get you started with mobile prototyping immediately. You will learn how to develop an application from scratch, and will be guided through each and every step.If you are a mobile-centric developer/designer, or someone who would like to take their Axure prototyping skills to the next level and start designing and testing mobile prototypes, this book is ideal for you. You should be familiar with prototyping and Axure specifically, before you read this book.

  5. Decree of the State Office for Nuclear Safety no. 146/1997 specifying nuclear safety-related activities and activities of special radiation protection relevance, requirements for qualification and professional education and training, procedures to examine special professional competence and to grant licences to selected personnel, and the format of documentation to be submitted when applying for selected personnel training licence

    International Nuclear Information System (INIS)

    Egermaier, J.

    2001-01-01

    The Decree is reproduced in the form of facsimile of the relevant pages of the official Collection of Laws of the Czech Republic, and accompanied by a commentary highlighting the past legislative developments and some aspects of this new document. (P.A.)

  6. IEEE Std 535-1979: IEEE standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 279-1971 and IEE Std 308-1978, can be demonstrated by using the procedures provided in this standard in accordance with IEEE Std 323-1974. Battery sizing, maintenance, capacity testing, installation, charging equipment and consideration of other type batteries are beyond the scope of this standard

  7. IEEE Std 535-1986: IEEE standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 308-1980 can be demonstrated by using the procedures provided in this standard in accordance with ANSI/IEEE Std 323-1983. Battery sizing, maintenance, capacity testing, installation, charging equipment, and consideration of other type batteries are beyond the scope of this standard

  8. Qualification tests for shift personnel in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fechner, J B [Bundesministerium des Innern, Bonn (Germany, F.R.)

    1978-02-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors.

  9. Qualification issues for advanced light-water reactor protection systems

    International Nuclear Information System (INIS)

    Korsah, K.; Clark, R.L.; Antonescu, C.

    1993-01-01

    The instrumentation and control (I ampersand C) systems in advanced reactors will make extensive use of digital controls, microprocessors, multiplexing, and fiber optic transmission. Elements of these advances in I ampersand C have been implemented on some current operating plants. However, the widespread use of the above technologies, as well as the use of artificial intelligence with minimum reliance on human operator control of reactors, highlights the need to develop standards for qualifying the I ampersand C used in the next generation of nuclear power plants. As a first step in this direction, the protection system I ampersand C for present-day plants was compared to that proposed for advanced light-water reactors (ALWRs). An evaluation template was developed by assembling a configuration of a safety channel instrument string for a generic ALWR, then comparing the impact of environmental stressors on that string to their effect on an equivalent instrument string from an existing light-water reactor. The template was then used to suggest a methodology for the qualification of microprocessor-based protection systems. The methodology identifies standards/regulatory guides (or lack thereof) for the qualification of microprocessor-based safety I ampersand C systems. This approach addresses in part issues raised in NRC policy document SECY-91-292, which recognizes that advanced I ampersand C systems for the nuclear industry are ''being developed without consensus standards. as the technology available for design is ahead of the technology that is well understood through experience and supported by application standards.''

  10. Qualification tests for shift personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1978-01-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors. (orig.) [de

  11. Qualification program of the ASTRID SFR project: definition, methodology and associated risk evaluation and management - 15093

    International Nuclear Information System (INIS)

    Rodriguez, G.; Dirat, J.F.; Traina, A.; Christofari, M.

    2015-01-01

    The Preconceptual Design phase of the ASTRID French Sodium Fast Reactor project had the objective to integrate innovative options to meet the requirements of the 4. generation reactors and to comply with the related specifications. It was followed by the conceptual phase studies (AVP2 phase 2013-2015) where some technical options are left opened with an advanced option and a backup alternative. In the same time of the AVP2 phase studies, the qualification program related to ASTRID project was initiated. It consists in collecting the exhaustive list of research/development (R/D) needs and technological demonstration tests to be fulfilled on representative mockup prior to component implementation in the prototype. The ASTRID Qualification Program (AQP) objectives are to collect needs expressed by all engineering companies involved in ASTRID, and then to organize the answer to this expression of needs. This significant work of needs compilation has been divided in several tasks, according to the ASTRID project decomposition in the Product Breakdown Structure (PBS). Compilation of needs was jointly performed by engineering company, R/D responsible and coordinated by the ASTRID Qualification project responsible. It was associated with an evaluation of the maturity level of the technical options thanks to a Technological Readiness Level grid (TRL ranking table), an identification of major risks, and an evaluation of the R/D potentiality and associated facility platform. The methodology applied for the ASTRID Qualification Program (AQP) is presented. It is explained what methodology was used associated to the TRL process, and how is managed the associated risk analysis evaluation: evaluation of major risks, definition of a risk portfolio and a corresponding Action Plan for risk reduction (synthesized under the REM acronym: Risk Evaluation and Management). This methodology is a mean used to facilitate ASTRID risk-informed decision making, technology qualification and

  12. Guidelines for training and qualification of radiological protection technicians

    International Nuclear Information System (INIS)

    1987-08-01

    guidelines and plant-specific needs should provide assurance that individuals successfully completing the programs will be able to perform their jobs competently. It is recognized, however, that successful programs can be developed without strict adherence to each guideline recommendation. INPO welcomes suggestions for improving these guidelines as member utilities gain experience in their use. These guidelines supersede INPO 82-006, Radiological Protection Technician Qualification Programs. Due to extensive changes, side barring was not used in this document

  13. Fiber Laser Component Testing for Space Qualification Protocol Development

    Science.gov (United States)

    Falvey, S.; Buelow, M.; Nelson, B.; Starcher, Y.; Thienel, L.; Rhodes, C.; Tull, Jackson; Drape, T.; Westfall, C.

    A test protocol for the space qualifying of Ytterbium-doped diode-pumped fiber laser (DPFL) components was developed under the Bright Light effort, sponsored by AFRL/VSE. A literature search was performed and summarized in an AMOS 2005 conference paper that formed the building blocks for the development of the test protocol. The test protocol was developed from the experience of the Bright Light team, the information in the literature search, and the results of a study of the Telcordia standards. Based on this protocol developed, test procedures and acceptance criteria for a series of vibration, thermal/vacuum, and radiation exposure tests were developed for selected fiber laser components. Northrop Grumman led the effort in vibration and thermal testing of these components at the Aerospace Engineering Facility on Kirtland Air Force Base, NM. The results of the tests conducted have been evaluated. This paper discusses the vibration and thermal testing that was executed to validate the test protocol. The lessons learned will aid in future assessments and definition of space qualification protocols. Components representative of major items within a Ytterbium-doped diode-pumped fiber laser were selected for testing; including fibers, isolators, combiners, fiber Bragg gratings, and laser diodes. Selection of the components was based on guidelines to test multiple models of typical fiber laser components. A goal of the effort was to test two models (i.e. different manufacturers) of each type of article selected, representing different technologies for the same type of device. The test articles did not include subsystems or systems. These components and parts may not be available commercial-off-the-shelf (COTS), and, in fact, many are custom articles, or newly developed by the manufacturer. The primary goal for this effort is a completed taxonomy that lists all relevant laser components, modules, subsystems, and interfaces, and cites the documentation for space

  14. Window prototypes during the project

    DEFF Research Database (Denmark)

    Schultz, Jørgen Munthe

    1996-01-01

    The conditions for the PASSYS test and the results of the measurements on one of the aerogel window prototypes are described.......The conditions for the PASSYS test and the results of the measurements on one of the aerogel window prototypes are described....

  15. Rapid prototyping: een veelbelovende methode

    NARCIS (Netherlands)

    Haverman, T.M.; Karagozoglu, K.H.; Prins, H.; Schulten, E.A.J.M.; Forouzanfar, T.

    2013-01-01

    Rapid prototyping is a method which makes it possible to produce a three-dimensional model based on two-dimensional imaging. Various rapid prototyping methods are available for modelling, such as stereolithography, selective laser sintering, direct laser metal sintering, two-photon polymerization,

  16. Role model and prototype matching

    DEFF Research Database (Denmark)

    Lykkegaard, Eva; Ulriksen, Lars

    2016-01-01

    ’ meetings with the role models affected their thoughts concerning STEM students and attending university. The regular self-to-prototype matching process was shown in real-life role-models meetings to be extended to a more complex three-way matching process between students’ self-perceptions, prototype...

  17. SIMS prototype System 3 test results: engineering analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  18. SIMS prototype system 3 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating is presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  19. Unintended Consequences: How Qualification Constrains Innovation

    Science.gov (United States)

    Brice, Craig A.

    2011-01-01

    The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

  20. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  1. Prototypical versus contemporary Mediterranean Diet.

    Science.gov (United States)

    Rizza, W; De Gara, L; Antonelli Incalzi, R; Pedone, C

    2016-10-01

    To investigate the evolution of the Mediterranean Diet (MD) in a delimited area of Southern Italy, by comparing the diet adopted 60-70 years ago (Prototypical Mediterranean Diet, PMD) with the contemporary one (Contemporary Mediterranean Diet, CMD), and to verify to what extent they fitted the recommendations of the Italian and the USDA dietary guidelines. We recruited a total of 106 participants, divided in two groups. PMD group included 52 women aged >80 years, with a good cognitive function and full independence in basic and instrumental activities of daily living. CMD group included 20 men and 34 women aged 50-60 years. Food intake was assessed by administering the EPIC food frequency questionnaire to each participant, and an additional survey to the PMD subjects only. Both PMD and CMD showed adequate intakes of macronutrients, although some deficiencies related to micronutrient requirements were evident. CMD showed a slightly greater use of animal products, processed and sugary foods, and higher intakes of simple sugars, animal proteins (49.6 vs 28.3 g/day), animal lipids (37.8 vs 20.1 g/day), saturated fats (25.0 vs 15.8 g/day) and cholesterol (305.0 vs 258.5 g/day). PMD showed many similarities to the original version of the MD in terms of macronutrients distribution and food choices. The documented evolution of the dietary habits over a 70 years timespan suggests that nowadays Mediterranean regions adhere less strictly to the original MD, although nutrients intakes are adequate to LARN and USDA recommendations. Copyright © 2016 European Society for Clinical Nutrition and Metabolism. Published by Elsevier Ltd. All rights reserved.

  2. Virtual Prototyping at CERN

    Science.gov (United States)

    Gennaro, Silvano De

    The VENUS (Virtual Environment Navigation in the Underground Sites) project is probably the largest Virtual Reality application to Engineering design in the world. VENUS is just over one year old and offers a fully immersive and stereoscopic "flythru" of the LHC pits for the proposed experiments, including the experimental area equipment and the surface models that are being prepared for a territorial impact study. VENUS' Virtual Prototypes are an ideal replacement for the wooden models traditionally build for the past CERN machines, as they are generated directly from the EUCLID CAD files, therefore they are totally reliable, they can be updated in a matter of minutes, and they allow designers to explore them from inside, in a one-to-one scale. Navigation can be performed on the computer screen, on a stereoscopic large projection screen, or in immersive conditions, with an helmet and 3D mouse. By using specialised collision detection software, the computer can find optimal paths to lower each detector part into the pits and position it to destination, letting us visualize the whole assembly probess. During construction, these paths can be fed to a robot controller, which can operate the bridge cranes and build LHC almost without human intervention. VENUS is currently developing a multiplatform VR browser that will let the whole HEP community access LHC's Virtual Protoypes over the web. Many interesting things took place during the conference on Virtual Reality. For more information please refer to the Virtual Reality section.

  3. UA1 prototype detector

    CERN Multimedia

    1980-01-01

    Prototype of UA1 central detector inside a plexi tube. The UA1 experiment ran at CERN's Super Proton Synchrotron and made the Nobel Prize winning discovery of W and Z particles in 1983. The UA1 central detector was crucial to understanding the complex topology of proton-antiproton events. It played a most important role in identifying a handful of Ws and Zs among billions of collisions. The detector was essentially a wire chamber - a 6-chamber cylindrical assembly 5.8 m long and 2.3 m in diameter, the largest imaging drift chamber of its day. It recorded the tracks of charged particles curving in a 0.7 Tesla magnetic field, measuring their momentum, the sign of their electric charge and their rate of energy loss (dE/dx). Atoms in the argon-ethane gas mixture filling the chambers were ionised by the passage of charged particles. The electrons which were released drifted along an electric field shaped by field wires and were collected on sense wires. The geometrical arrangement of the 17000 field wires and 6...

  4. Data Qualification Report For DTN: MO0012RIB00065.002, Parameter Values For Transfer Coefficients

    International Nuclear Information System (INIS)

    C.H. Tung

    2001-01-01

    A data-qualification evaluation was conducted on Reference Information Base (RIB) data set MOO0 12RIB00065.002, ''Parameter Values for Transfer Coefficients''. The corroborating data method was used to evaluate the data. This method was selected because it closely matches the literature-review method followed to select parameter values. Five criteria were considered when the corroborating method was used: adequacy of the corroborative literature, sufficiency of value-selection criteria, implementation of the selection criteria, documentation of the process, and whether the analysis was conducted in accordance with applicable quality assurance (QA) procedures. Three criteria were used when a literature review was not conducted: appropriate logic used to select parameters, documentation of the process, and whether the analysis was conducted in accordance with applicable QA procedures. The RIB data item, the associated Analysis and Model Report (AMR), the corroborative literature, and the results of an audit revision O/ICN--0 of the AMR were examined. All calculations and the selection process for all values were repeated and confirmed. The qualification team concluded: (1) A sufficient quantity of corroborative literature was reviewed and no additional literature was identified that should have been considered. (2) The selection criteria were sufficient and resulted in valid parameter values. (3) The process was well defined, adequately documented in the AMR, and correctly followed. (4) The analysis was developed in accordance with applicable QA procedures. No negative findings were documented that resulted in questions about the quality of the data. The qualification team therefore recommends that the qualification status of RIB data set MO0012RIB00065.002 be changed to qualified

  5. DATA QUALIFICATION REPORT: DATA QUALIFICATION REPORT FOR 1991 1:1200 TOPOGRAPHIC MAPS FOR USE ON THE YUCCA MOUNTAIN PROJECT

    International Nuclear Information System (INIS)

    Knop, M.F.; Grant, T.A.; Bonisolli, R.W.

    2005-01-01

    This Data Qualification Report (DQR) is prepared in accordance with the provisions of AP-SIII.2Q, Rev. 0, ICN 3, Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data and Data Qualification Plan for 1991 Topographic Maps 1:1200 Scale for use on the Yucca Mountain Project, DQP-WHS-CI-000001, Rev. 00 (BSC 2002a). This DQR presents an evaluation of a set of 90 topographic sheets at 1:1200 scale (and an associated electronic file) that covers an approximate 18 square mile area surrounding the proposed Yucca Mountain Project repository surface facilities location in Midway Valley, Nevada. These maps, that require qualification, are now being used to determine the physical characteristics of watershed sub-areas, interconnecting channels, and drainage channel cross-sections for hydrologic engineering studies of the north portal pad and vicinity. The result of this effort is to qualify one data tracking number (DTN) containing the electronic version of the mapping data. This DTN is: M09906COV98462.000. Coverage: TOP02FTS. The underlying quality assurance (QA) issue associated with these topographic maps is that the maps were originally designated as not for use in the design of items important to safety, waste isolation, and/or of programmatic importance. The maps were therefore generated outside the U.S. Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) QA program. Based on a comparison with corroborating information, this report concludes that the topographic maps are qualified. The comparison found that the mapping was reasonably accurate when compared with other mapping and survey data within the coverage area of the maps. Relative map accuracy was found to be very good and suitable for the hydrologic engineering studies being considered. Absolute accuracy is good but could not be demonstrated to comply with national map accuracy standards. Point locations that require high absolute accuracy should be

  6. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Smith, A.C.

    1999-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  7. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Van Alstine, M.N.

    1998-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  8. Global Trend In The Qualifications Of Medical Educators | Issa ...

    African Journals Online (AJOL)

    NPMCN) or its equivalents is the highest educational and professional qualification of clinical Medical Educators in Nigeria while PhD is the acceptable highest qualification for their basic medical sciences counterparts. This had been the status ...

  9. T25 Qualification of old containers

    International Nuclear Information System (INIS)

    Hoerning, T.; Kasparek, E.M.; Voelzke, H.

    2013-01-01

    Radioactive waste for final disposal in the repository Konrad has to be packaged in licensed containers. The qualification of containers is performed according the respective standards and BfS requirements. The latter ones differ for different container types with respect to accident resistance based on the release behavior of the waste. Usually qualification of container types is performed before series production. The qualification of already produced containers (''old containers'') is significantly more complicated. The differences of quality assurance and materials properties of the older containers have to be evaluated. A main tool for this evaluation is the numerical re-calculation of accident scenarios for estimation of the safety margins. The validation of appropriate finite element models is available. Based on these date it might be possible to abandon additional drop tests with the existing old containers to prove the structural integrity.

  10. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  11. Low-level radioactive waste form qualification testing

    Energy Technology Data Exchange (ETDEWEB)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing.

  12. Low-level radioactive waste form qualification testing

    International Nuclear Information System (INIS)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing

  13. Integrated Information System for Higher Education Qualifications

    Directory of Open Access Journals (Sweden)

    Catalin Ionut SILVESTRU

    2012-10-01

    Full Text Available In the present article we aim to study thoroughly and detail aspects related to architectures specific for e-learning and management of human resources training interconnected to management of qualifications. In addition, we take into consideration combining e-learning architectures with software in an e-learning system interconnected with the National Registry of Qualifications of Higher Education, in view of developing and information system that correlates educational supply from higher education from Romania with labor market demands through qualifications. The scientific endeavor consists of original architectural solutions to integrate data, systems, processes, services from various sources and to use them in the proposed system. The practical result of the scientific endeavor is represented by design of architectures required for developing an e-learning system interconnected with the National Registry of Qualifications from Romania, which involve in first stage the qualifications provided by higher education. The proposed innovative solution consists in the fact that the proposed information system combines the advantages of content management system (CMS with learning content management system (LCMS and with reusable learning objects (RLO. Thus, the architecture proposed in the research ensures the integration of a content management system with a portal for information, guidance and support in making a professional project. The integration enables correlation of competences with content areas and specific items from various teaching subjects, thus evaluating the usefulness for this registry from learning/educational perspective. Using the proposed information system in enables correlation among qualifications, content of educational program and continuous self-evaluation opportunities, which facilitate monitoring of progress and adjustment of learning content.

  14. Safety review for seismic qualification on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Fang Qingxian

    1995-01-01

    The standards and requirements for seismic qualification of nuclear power plant's component have been fully addressed, including the scope of seismic qualification, the approach and the method of common seismic qualification, the procedure of the seismic tests, and the criteria for the seismic qualification review. The problems discovered in the safety review and the solution for these problems and some other issues are also discussed

  15. Equipment qualification testing methodology research at Sandia Laboratories

    International Nuclear Information System (INIS)

    Jeppesen, D.

    1983-01-01

    The Equipment Qualification Research Testing (EQRT) program is an evolutionary outgrowth of the Qualification Testing Evaluation (QTE) program at Sandia. The primary emphasis of the program has been qualification methodology research. The EQRT program offers to the industry a research-oriented perspective on qualification-related component performance, as well as refinements to component testing standards which are based upon actual component testing research

  16. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  17. Qualification issues: the rest of the iceberg

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Luna, R.E.

    1978-01-01

    Reactor safety has been a primary concern since the beginning of commercial power reactor development. But only since the IEEE became actively involved (circa-1970), through IEEE-323-1971 and its predecessor drafts, has the qualification of selected Class 1 equipment been formalized and intensified. Currently EPRI and the USNRC are funding significant qualification research programs. However, these current research topics address only a few of the issues and there are more to come. A review of recent achievements and a discussion of some issues still to be encountered are presented

  18. Minimum qualifications for nuclear criticality safety professionals

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1990-01-01

    A Nuclear Criticality Technology and Safety Training Committee has been established within the U.S. Department of Energy (DOE) Nuclear Criticality Safety and Technology Project to review and, if necessary, develop standards for the training of personnel involved in nuclear criticality safety (NCS). The committee is exploring the need for developing a standard or other mechanism for establishing minimum qualifications for NCS professionals. The development of standards and regulatory guides for nuclear power plant personnel may serve as a guide in developing the minimum qualifications for NCS professionals

  19. AGC-2 Irradiation Data Qualification Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Laurence C. Hull

    2012-07-01

    The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. The second Advanced Graphite Creep (AGC) experiment (AGC-2) began with Advanced Test Reactor (ATR) Cycle 149A on April 12, 2011, and ended with ATR Cycle 151B on May 5, 2012. The purpose of this report is to qualify AGC-2 irradiation monitoring data following INL Management and Control Procedure 2691, Data Qualification. Data that are Qualified meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Data that do not meet the requirements are Failed. Some data may not quite meet the requirements, but may still provide some useable information. These data are labeled as Trend. No Trend data were identified for the AGC-2 experiment. All thermocouples functioned throughout the AGC-2 experiment. There was one instance where spurious signals or instrument power interruption resulted in a recorded temperature value being well outside physical reality. This value was identified and labeled as Failed data. All other temperature data are Qualified. All helium and argon gas flow data are within expected ranges. Total gas flow was approximately 50 sccm through the capsule. Helium gas flow was briefly increased to 100 sccm during reactor shutdown. All gas flow data are Qualified. At the start of the experiment, moisture in the outflow gas line increased to 200 ppmv then declined to less than 10 ppmv over a period of 5 days. This increase in moisture coincides with the initial heating of the experiment and drying of the system. Moisture slightly exceeded 10 ppmv three other times during the experiment. While these moisture values exceed the 10 ppmv threshold value, the reported measurements are considered accurate and to reflect moisture conditions in the capsule. All moisture data are Qualified. Graphite creep specimens are subjected to one of three loads, 393 lbf

  20. Report on the Regulators Experience of NDT Qualification for In-service Inspection of Nuclear Components

    International Nuclear Information System (INIS)

    2003-08-01

    In November 1992, the Nuclear Regulators Working Group (NRWG) decided to set up a task force on qualification of non-destructive testing (NDT) systems for pre and in-service inspection of light water reactors. The first task was to agree on the philosophy and principles governing the qualification of techniques, equipment, software, procedures, and personnel for NDT to be used for the inspection of structural components that are important to safety in nuclear power plants; and to establish a common view on essential aspects of NDT qualifications. The first task, which also included a comparison of the common views of the European regulators with the qualification approach outlined in Appendix VIII to Section XI of the ASME Code, was completed in 1996. The result was published in the report ''Common position of European regulators on qualification of NDT systems for pre- and in-service inspection of light water reactor components''2. In parallel, the European nuclear power industries had set up a working group, the European Network for Inspection Qualification (ENIQ), to discuss and agree on how to perform inspection qualifications. In 1995, ENIQ finalized its first version of ''European methodology for qualification of non-destructive tests''3. A second version 4 was then published in 1997. This second version is in relatively close agreement with the principles given in the regulators common position document. With these two basic documents, a platform was established for the further development of qualification strategies in the European countries. The second task of the NRWG Task Force was to follow and evaluate the first ENIQ pilot study from a regulatory point of view. The objective of this pilot study was to explore ways of how to apply the European qualification methodology and to test its feasibility. The pilot study commenced late 1996 and was planned to be finalized a year later. Depending on unforeseen difficulties, the pilot study has been delayed

  1. DATA QUALIFICATION REPORT: MAJOR ION AND PH DATA FOR USE ON THE YUCCA MOUNTAIN PROJECT

    International Nuclear Information System (INIS)

    C. WILSON; D.M. JENKINS; T. STEINBORN; R. WEMHEUER

    2000-01-01

    This data qualification report uses technical assessment and corroborating data methods according to Attachment 2 of AP-SIII.2Q, Rev. 0, ICN 2, ''Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data'', to qualify major ion and pH data. This report was prepared in accordance with Data Qualification Plan TDP-NBS-GS-00003 1, Revision 2. Additional reports will be prepared to address isotopic and precipitation-related data. Most of the data considered in this report were acquired and developed by the U.S. Geological Survey (USGS). The data qualification team considers the sampling and analytical protocols employed by the USGS over the time period of data acquisition to be state-of-the-art. The sample collection methodologies have evolved with no significant change that could affect the quality of the data considered in this report into the currently used Hydrologic Procedures that support the Yucca Mountain Project-approved USGS Quality Assurance Program Plan. Consequently, for USGS data, the data collection methods, documentation, and results are reasonable and appropriate in view of standard practice at the time the data were collected. A small number of data sets were collected by organizations other than the USGS and were reviewed along with the other major ion and pH data using corroborating data methods. Hydrochemical studies reviewed in this qualification report indicate that the extent and quality of corroborating data are sufficient to support qualification of both USGS and non-USGS major ion and pH data for generalized hydrochemical studies. The corroborating data included other major ion and pH data, isotope data, and independent hydrological data. Additionally, the analytical adequacy of the major ion data was supported by a study of anion-cation charge balances. Charge balance errors for USGS and non-USGS data were under 10% and acceptable for all data. This qualification report addresses the specific major ion data sets

  2. Prototype road weather performance management (RWPM) tool installation instructions & user manual.

    Science.gov (United States)

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  3. Prototyping the DARPA Image Understanding Environment (IUE) and Tools to Facilitate Its Use

    National Research Council Canada - National Science Library

    Lawton, Daryl

    1999-01-01

    ...) and Tools to Facilitate Its Use. The major objectives of this project were to support the design and development of the IUE, to prototype the IUE user interface and data exploration tools, and to develop tools for documentation...

  4. Prototyping the DARPA Image Understanding Environment and Tools to Facilitate Its Use

    National Research Council Canada - National Science Library

    Lawton, Daryl

    1998-01-01

    ...) and Tools to Facilitate Its Use. The major objectives of this project are to support the design and development of the IUE, to prototype the IUE user interface and data exploration tools, and to develop tools for documentation...

  5. Report on functional requirements and software architecture for the IDTO prototype : phase I demonstration site (Columbus).

    Science.gov (United States)

    2013-08-01

    This report documents the System Requirements and Architecture for the Phase I implementation of the Integrated Dynamic : Transit Operations (IDTO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle : Pro...

  6. Report on functional requirements and software architecture for the IDTO prototype phase 2 : central Florida demonstration.

    Science.gov (United States)

    2015-05-01

    This report documents the System Requirements and Architecture for the Phase 2 implementation of the Integrated Dynamic : Transit Operations (IDTO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle : Pro...

  7. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  8. 5 CFR 317.502 - Qualifications Review Board certification.

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS EMPLOYMENT IN THE SENIOR EXECUTIVE SERVICE Career Appointments § 317.502 Qualifications Review Board certification. (a) A Qualification Review Board (QRB) convened by OPM must certify the executive... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications Review Board certification...

  9. 14 CFR 121.453 - Flight engineer qualifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  10. 49 CFR 214.351 - Training and qualification of flagmen.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification of flagmen. 214.351... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.351 Training and qualification of flagmen. (a) The training and qualification for roadway workers assigned the...

  11. Bechtel automated control of design document data

    International Nuclear Information System (INIS)

    Hollingshaus, H.

    1986-01-01

    Concern for nuclear power plant safety has resulted in many design features that complicate the licensing, operation, and maintenance of nuclear plants. To manage and control the design effectively, Bechtel has developed an integrated design document data base that provides efficient support of the plant during all phases of its life. The program runs on the IBM System 38, but can also be downloaded to an IBM PC to save storage and connect time. It is interactive and can accommodate multiple users at various locations. Although primarily developed to manage design changes resulting from the regulatory process and use of a fast track construction schedule, the data base will provide operations and maintenance personnel with qualifications status and pertinent data for each piece of equipment, including all electrical devices and a list of all associated design documents

  12. A uniform approach for on-site training and qualification of health physics technicians

    International Nuclear Information System (INIS)

    Till, J.E.

    1977-01-01

    Estimates show that in the U.S. approx. 75% of the health physics technicians received their training through courses offered by their employer. The quality and the extent of this training vary considerably among nuclear facilities. This paper describes a uniform approach for on-site training and qualification of health physics technicians applicable to all nuclear facilities. The program consists of four levels of qualification: Health Physics Technician Trainee, Technician I, Technician II and Senior Technician. The training is divided into modules that are composed of formal lectures, practical factors, experience, and a comprehensive examination. The minimum time required from hiring of inexperienced trainees to qualification as Senior Technicians is approx. 24 months. A qualification guide lists each step a technician must complete in the training program and provides documentation which facilitates audits by internal and external groups. Although items in the program would differ between facilities, the program provides specific titles for technicians, based on their training and experience, which would be applicable throughout the nuclear industry. (author)

  13. Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2013-02-01

    The purpose of this report is to describe programs and tools for assessment of accomplished and documented qualification with respect to ageing of electrical equipment and for development of complimentary ageing management programs. In addition to description of complete programs for management of ageing, tools for validation of the status with regard to ageing of installed ('old') equipment and, where needed, for complementation of their qualification are also included. The report is restricted to safety related equipment containing ageing sensitive parts, mainly organic materials. To this category belong cables and cable joints and a number of equipment containing oils, seals (o-rings), etc. For equipment located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. The main part of this report deals with the qualification of such equipment. Some safety related equipment outside the containment can be located in areas where they are subjected to high temperature and other excessive environmental stresses during normal operation and in areas affected by an accident. Therefore, some material is given also on qualification of equipment located outside containment with better possibilities for frequent inspection and supervision. Part 1 of the report is an executive summary with a general review of the methodologies and their application. The more detailed description of the programs and underlying material, useful data, etc. is given in Part 2

  14. Nodalization qualification process of the PSBVVER facility for the Cathare2 thermal-hydraulic code

    International Nuclear Information System (INIS)

    Del Nevo, A.; Araneo, D.; D'Auria, F.; Galassi, G.

    2004-01-01

    The present document deals with the nodalization qualification process of the PSB-VVER test facility for Cathare2 code. PSB-VVER facility is a 1/300 volume scale model of a VVER-1000, reactor installed at Electrogorsk Research and Engineering Centre in 1998. The version V1.5b of the Cathare2 code has been used. In order to evaluate the nodalization performance, the qualifying procedure set up at the DIMNP of Pisa University (UNIPI) has been applied that foresees two qualification levels: a 'steady state' level and an 'on transient' level. After the steady state behavior check of the nodalization, it has been preformed the on transient qualification the PSB-VVER test 2. It is a 11% equivalent break in Upper Plenum with the actuation of one high pressure injection system, connected to the hot leg of the loop 4, and 4 passive systems (ECCS hydro-accumulators), connected to the outlet plenum and to the inlet chamber of the downcomer. The low-pressure injection system is not available in the test. The goal of this paper is to demonstrate that the first step of the nodalization qualification adopted for the PSB test analyses is achieved and the PSB facility input deck is available and ready to use. The quantitative accuracy of the performed calculation has been evaluated by using the FFT-BM tool developed at the University of Pisa.(author)

  15. Inspection qualification as a tool to risk based ET ISI of VVER type SG tubes

    International Nuclear Information System (INIS)

    Horacek, L.

    2002-01-01

    A Pilot study on Eddy current inspection qualification of VVER 440 steam generator tubes, discussed in this paper, followed the ENIQ methodology principles and covered briefly the assumed scope of ET qualification, relevant elaborated qualification documents, known ISI limitations and a review of input information on component and defects determined for Eddy current inspection qualification of VVER 440 steam generator tubes. The information includes the fabrication of the test blocks with SG tube segments provided by intended defect simulations of realistic SCC type and basic data on the realistic SCC type defects manufacturing technology. Lessons learned from the development of manufacturing technology of SSC type of defects, regional blind tests, elaboration of the preliminary technical justification for Eddy current automated inspections, potential optimisation of inspection procedures, laboratory and practical open trials are summarised in the paper. The results of the Pilot study also especially in relation to POD curve being determined seem to be useful for practical operational ISI programme and Risk informed ISI decisions and the establishment of plugging criteria of VVER 440 and VVER 1000 type steam generator tubes. (orig.)

  16. Process and equipment qualification of the ceramic and metal waste forms for spent fuel treatment

    International Nuclear Information System (INIS)

    Marsden, Ken; Knight, Collin; Bateman, Kenneth; Westphal, Brian; Lind, Paul

    2005-01-01

    The electrometallurgical process for treating sodium-bonded spent metallic fuel at the Materials and Fuels Complex of the Idaho National Laboratory separates actinides and partitions fission products into two waste forms. The first is the metal waste form, which is primarily composed of stainless steel from the fuel cladding. This stainless steel is alloyed with 15w% zirconium to produce a very corrosion-resistant metal which binds noble metal fission products and residual actinides. The second is the ceramic waste form which stabilizes fission product-loaded chloride salts in a sodalite and glass composite. These two waste forms will be packaged together for disposal at the Yucca Mountain repository. Two production-scale metal waste furnaces have been constructed. The first is in a large argon-atmosphere glovebox and has been used for equipment qualification, process development, and process qualification - the demonstration of process reliability for production of the DOE-qualified metal waste form. The second furnace will be transferred into a hot cell for production of metal waste. Prototype production-scale ceramic waste equipment has been constructed or procured; some equipment has been qualified with fission product-loaded salt in the hot cell. Qualification of the remaining equipment with surrogate materials is underway. (author)

  17. Prototype moving-ring reactor

    International Nuclear Information System (INIS)

    Smith, A.C. Jr.; Ashworth, C.P.; Abreu, K.E.

    1981-01-01

    The objective of this work was to design a prototype fusion reactor based on fusion plasmas confined as ''Compact Toruses.' Six major criteria guided the prototype design. The prototype must: (1) produce net electricity decisively (P/sub net/ >70% of P/sub gross/), with P/sub net/ approximately 100 MW(e); (2) have small physical size (low project cost) but commercial plant; (3) have all features required of commerical plants; (4) avoid unreasonable extrapolation of technology; (5) minimize nuclear issues substantially, i.e. accident and waste issues of public concern, and (6) be modular (to permit repetitive fabrication of parts) and be maintainable with low occupational radiological exposures

  18. Learning Axure RP interactive prototypes

    CERN Document Server

    Krahenbuhl, John Henry

    2015-01-01

    If you are a user experience professional, designer, information architect, or business analyst who wants to gain interactive prototyping skills with Axure, then this book is ideal for you. Some familiarity with Axure is preferred but not essential.

  19. Architectural Prototyping in Industrial Practice

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak; Hansen, Klaus Marius

    2008-01-01

    Architectural prototyping is the process of using executable code to investigate stakeholders’ software architecture concerns with respect to a system under development. Previous work has established this as a useful and cost-effective way of exploration and learning of the design space of a system......, in addressing issues regarding quality attributes, in addressing architectural risks, and in addressing the problem of knowledge transfer and conformance. Little work has been reported so far on the actual industrial use of architectural prototyping. In this paper, we report from an ethnographical study...... and focus group involving architects from four companies in which we have focused on architectural prototypes. Our findings conclude that architectural prototypes play an important role in resolving problems experimentally, but less so in exploring alternative solutions. Furthermore, architectural...

  20. Experimentation with PEC channel prototype

    International Nuclear Information System (INIS)

    Caponetti, R.; Iacovelli, M.

    1984-01-01

    Experimentation on prototypes of PEC components is presently being carried out at Casaccia CRE. This report shows the results of the first cycle of experimentation of the central channel, concerning the aspects of sodium removal after experimentation

  1. Generic safety documentation model

    International Nuclear Information System (INIS)

    Mahn, J.A.

    1994-04-01

    This document is intended to be a resource for preparers of safety documentation for Sandia National Laboratories, New Mexico facilities. It provides standardized discussions of some topics that are generic to most, if not all, Sandia/NM facilities safety documents. The material provides a ''core'' upon which to develop facility-specific safety documentation. The use of the information in this document will reduce the cost of safety document preparation and improve consistency of information

  2. Tangiplay: prototyping tangible electronic games

    OpenAIRE

    Boileau, Jason

    2010-01-01

    Tangible electronic games currently exist in research laboratories around the world but have yet to transition to the commercial sector. The development process of a tangible electronic game is one of the factors preventing progression, as it requires much time and money. Prototyping tools for tangible hardware and software development are becoming more available but are targeted to programmers and technically trained developers. Paper prototyping board and video games is a proven and rapid m...

  3. Qualification of the AUTOBUS Mod. 2 Code

    International Nuclear Information System (INIS)

    Ciarniello, U.; Peroni, P.

    1988-01-01

    The paper presents the qualification of AUTOBUS MOD.2 code. After a brief description of the code itself, all the critical experiments simulated by the code are illustrated to prove the accuracy of criticality calculation and power distribution. An interpretation of the results and a conclusion close this presentation

  4. Qualifications and Skills: The Organisational Perspective

    Science.gov (United States)

    Dafou, Efthimia

    2009-01-01

    This paper portrays the inferences that employers in Greece draw from particular aspects of study programmes, as recorded on educational qualifications. Based on semi-structured interviews with human resource managers in 37 industrial and service organisations and general directors of careers offices in eight higher education institutions, and…

  5. The Diploma Disease. Education, Qualification and Development.

    Science.gov (United States)

    Dore, Ronald

    The aims and motives of schooling are changing, and it is becoming more and more a ritualized process of qualification-earning. The underlying causes of this change are traced through the education histories of Britain, Japan, Sri Lanka, and Kenya. It is illustrated that the competitve scramble for scarce modern jobs has created a "backwash…

  6. STEM Leadership Qualification: Tomorrow's Leaders Today

    Science.gov (United States)

    Williams, Chris

    2009-01-01

    This article features the Science, Technology, Engineering and Mathematics (STEM) Leadership Qualification programme, developed by the Centre for Science Education (CSE) at Sheffield Hallam University in collaboration with Edexcel, which sets out to develop leadership skills and capabilities through contexts in STEM. With six units to complete…

  7. Relationship Between Teachers\\' Qualification And Students ...

    African Journals Online (AJOL)

    It has been observed that students\\' performance in technical subjects is very poor. Coupled with this problem is that of lack of qualified technical teachers. This study determines the relationship between teachers\\' qualification and students\\' performance in technical subjects in selected schools in northern Nigeria.

  8. PR Faculty: What Are Their Qualifications?

    Science.gov (United States)

    Johnson, Thomas B.; Rabin, Kenneth

    1977-01-01

    Discusses a study designed to determine existing trends in the backgrounds and qualifications of public relations instructors and how these might affect public relations education. Available from: Public Relations Review, Ray Hiebert, Dean, College of Journalism, University of Maryland, College Park, MD 20742. (MH)

  9. 5 CFR 330.208 - Qualification requirements.

    Science.gov (United States)

    2010-01-01

    ... perform the duties and responsibilities of the position. (c) The sex of an individual may not be... qualified for a position if he or she: (1) Meets OPM-established or approved qualification standards and requirements for the position, including any minimum educational requirements, and any selection placement...

  10. 42 CFR 485.705 - Personnel qualifications.

    Science.gov (United States)

    2010-10-01

    ... Physical Therapy and Speech-Language Pathology Services § 485.705 Personnel qualifications. (a) General... involved in the furnishing of outpatient physical therapy, occupational therapy, and speech-language...) of the Act and the requirements in part 484 of this chapter. (2) For a speech-language pathologist...

  11. 15 CFR 40.2 - Qualifications.

    Science.gov (United States)

    2010-01-01

    ... Qualifications. (a) To be eligible for a training grant at the Bureau of the Census the applicant must be: (1) A... training programs. (2) Able to speak, read, write, and understand the English language. (3) Sponsored by his government either directly with the United States or through a public international agency. (4...

  12. PROBLEMS OF QUALIFICATION OF MEDIATHION IN BRIBERY

    Directory of Open Access Journals (Sweden)

    Alexander Uskin

    2015-12-01

    Full Text Available The article analysed the controversial issues of qualification of actions of the intermediary in bribery under article 291.1 of the Criminal code, are the kinds of mediation depending on the subject of bribes. On the basis of analysis of legislative construction is concluded decriminalize mediation in bribery if the bribe amount is less than 25 thousand rubles.

  13. Fast-prototyping of VLSI

    International Nuclear Information System (INIS)

    Saucier, G.; Read, E.

    1987-01-01

    Fast-prototyping will be a reality in the very near future if both straightforward design methods and fast manufacturing facilities are available. This book focuses, first, on the motivation for fast-prototyping. Economic aspects and market considerations are analysed by European and Japanese companies. In the second chapter, new design methods are identified, mainly for full custom circuits. Of course, silicon compilers play a key role and the introduction of artificial intelligence techniques sheds a new light on the subject. At present, fast-prototyping on gate arrays or on standard cells is the most conventional technique and the third chapter updates the state-of-the art in this area. The fourth chapter concentrates specifically on the e-beam direct-writing for submicron IC technologies. In the fifth chapter, a strategic point in fast-prototyping, namely the test problem is addressed. The design for testability and the interface to the test equipment are mandatory to fulfill the test requirement for fast-prototyping. Finally, the last chapter deals with the subject of education when many people complain about the lack of use of fast-prototyping in higher education for VLSI

  14. Mechatronics Education: From Paper Design to Product Prototype Using LEGO NXT Parts

    Science.gov (United States)

    Lofaro, Daniel M.; Le, Tony Truong Giang; Oh, Paul

    The industrial design cycle starts with design then simulation, prototyping, and testing. When the tests do not match the design requirements the design process is started over again. It is important for students to experience this process before they leave their academic institution. The high cost of the prototype phase, due to CNC/Rapid Prototype machine costs, makes hands on study of this process expensive for students and the academic institutions. This document shows that the commercially available LEGO NXT Robot kit is a viable low cost surrogate to the expensive industrial CNC/Rapid Prototype portion of the industrial design cycle.

  15. SRNL Phase 1 Assessment Of The WAC/DQO And Unit Operations For The WTP Waste Qualification Program

    International Nuclear Information System (INIS)

    Peeler, D.; Adamson, D.; Bannochie, C.; Cozzi, A.; Eibling, R.; Hay, M.; Hansen, E.; Herman, D.; Martino, C.; Nash, C.; Pennebaker, F.; Poirier, M.; Reboul, S.; Stone, M.; Taylor-Pashow, K.; White, T.; Wilmarth, B.

    2012-01-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap identification

  16. SRNL PHASE 1 ASSESSMENT OF THE WAC/DQO AND UNIT OPERATIONS FOR THE WTP WASTE QUALIFICATION PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    Peeler, D.; Adamson, D.; Bannochie, C.; Cozzi, A.; Eibling, R.; Hay, M.; Hansen, E.; Herman, D.; Martino, C.; Nash, C.; Pennebaker, F.; Poirier, M.; Reboul, S.; Stone, M.; Taylor-Pashow, K.; White, T.; Wilmarth, B.

    2012-05-16

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap

  17. Commissioning of qualification of structures, systems and components for seismic and environmental loads of CIRENE nuclear power plant

    International Nuclear Information System (INIS)

    Bianchi, A.; Gatti, F.; Muzzi, F.; Zola, M.; De Pasquali, F.

    1993-01-01

    On behalf of the Italian National Electricity Board (ENEL) concerning the commissioning of qualification of structures, systems and components of CIRENE NPP, ISMES performed a technical surveillance on the documentation concerning the environmental and seismic qualification of the safety related systems and experimental activities (dynamic and static tests) on plant buildings. The aims of the work were: - the evaluation of the qualification carried out (by test, by analysis, by combination of analysis and test) on the equipment and system, compared with the requirements of the ENEL technical specifications and the most recent international regulations; - the experimental determination of modal quantities (frequencies, damping, mode shapes) of the structures and, in the case of reactor building, the complex impedance of the soil for supporting the analytical work. The present paper deals with the criteria, the system and the results concerning the technical surveillance and with the characteristics and the results of the experimental tests

  18. Comparative Study of Laboratory-Scale and Prototypic Production-Scale Fuel Fabrication Processes and Product Characteristics

    International Nuclear Information System (INIS)

    Marshall, Douglas W.

    2014-01-01

    An objective of the High Temperature Gas Reactor fuel development and qualification program for the United States Department of Energy has been to qualify fuel fabricated in prototypic production-scale equipment. The quality and characteristics of the tristructural isotropic (TRISO) coatings on fuel kernels are influenced by the equipment scale and processing parameters. The standard deviations of some TRISO layer characteristics were diminished while others have become more significant in the larger processing equipment. The impact on statistical variability of the processes and the products, as equipment was scaled, are discussed. The prototypic production-scale processes produce test fuels meeting all fuel quality specifications. (author)

  19. Safety critical software development qualification

    International Nuclear Information System (INIS)

    Marron, J. E.

    2006-01-01

    With the increasing use of digital systems in control applications, customers must acquire appropriate expectations for software development and quality assurance procedures. Purchasers and users of digital systems need to understand the benefits to the supplier of effective quality systems. These systems consist not only of procedures but tools that enable automation. Without the use of automation, quality can not be assured. A software and systems quality program starts with the documents you are very familiar with. But these documents must define more than the final system. They must address specific development environment characteristics and testing capabilities. Starting with the RFP, some of the items that should be introduced are Software Configuration Management, regression testing and defect tracking. The digital system customer is in the best position to enforce the use of software and systems quality programs by including them in project requirements as early as the Purchase Order. The customer's understanding of the full scope and implementation of a software quality program is essential to achieving the quality necessary in nuclear projects, and, incidentally, completing those projects on schedule. (authors)

  20. Regulatory Guide 1.131: Qualification tests of electric cables, field splices, and connections for light-water-cooled nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Criterion III, ''Design Control,'' of Appendix B, ''Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plant,'' to 10 CFR Part 50, ''Licensing of Production and Utilization Facilities,'' requires that, where a test program is used to verify the adequacy of a specific design feature, it include suitable qualification testing of a prototype unit under the most adverse design conditions. This regulatory guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification testing of electric cables, field splices, and connections for service in light-water-cooled nuclear power plants to ensure that the cables, field splices, and connections can perform their safety-related functions. The fire test provisions of this guide do not apply to qualification for an installed configuration

  1. Aiding the Interpretation of Ancient Documents

    DEFF Research Database (Denmark)

    Roued-Cunliffe, Henriette

    How can Decision Support System (DSS) software aid the interpretation process involved in the reading of ancient documents? This paper discusses the development of a DSS prototype for the reading of ancient texts. In this context the term ‘ancient documents’ is used to describe mainly Greek...... tool it is important first to comprehend the interpretation process involved in reading ancient documents. This is not a linear process but rather a recursive process where the scholar moves between different levels of reading, such as ‘understanding the meaning of a character’ or ‘understanding...

  2. Romanian-Canadian joint program for qualification of FCN as a CANDU fuel supplier

    International Nuclear Information System (INIS)

    Galeriu, C.A.; Andrei, G.; Bailescu, A.

    1995-01-01

    RENEL (Romania Power Authority), the co-ordinator of Romanian Nuclear Program, have decided to improve, starting 1990 the existing capability to produce CANDU nuclear fuel at FCN Pitesti. The objective of the program was defined with AAC (AECL - ANSALDO Consortium) for the qualification of FCN fuel plant according to Canadian Z299.2 standard. The Qualification Program was performed under AAC Work Order C-003. The co-ordination was assumed by AECL, as overall Design Authority. ZPI (Zircatec Precision Industries Inc., Canada), were designated to supply technical assistance, equipments and know how where necessary. After a preliminary verification of the FCN fuel plant, including the processes and system investigation, performed under AECL and ZPI assistance, the Qualification Program was defined in all details. The upgrading of documentation on all aspects required by Z299.2 was performed. Few processes needed to be reconsidered and equipment was delivered by ZPI or other suppliers. This includes mainly welding equipments and special inspection equipments. Health Physics was practically fully reconsidered. New equipment and practice were adapted to provide adequate control on health conditions. Every manufacturing and inspection process was checked to determine their performance during a Qualification Run based on acceptance criteria which have been established in the Qualification Plan. Manufacturing Demonstration Run was an important step to prove that all plant functions have been accomplished during the fabrication of 200 fuel bundles. These bundles have been fully accepted and 66 of them have been loaded in the first charge of Unit 1 Cemavoda NPS. The surveillance and audit actions made by AECL and ZPI during this period confirmed the FCN capability to operate an adequate system meeting the to required quality assurance standard. The very open attitude of AECL, Zircatec and FCN staff have stimulated the progress of the project and a successful achievement of the

  3. Evaluation of environmental qualification period for Conax electrical penetration assemblies. Final report

    International Nuclear Information System (INIS)

    Doroshuk, B.; Hager, M.; Brown, R.

    1995-05-01

    This report evaluates the environmental qualification period of Conax electrical penetration assemblies (EPAs) for extension from forty (40) years to sixty (60) years. The evaluation was performed based on a review of Conax EPAs supplied to Baltimore Gas ampersand Electric's (BGE) Calvert Cliffs Nuclear Power Plant Units 1 and 2. The report has been prepared so that it may be of use to any utility involved in the extension of the environmental qualification period for Conax EPAs installed in their plant(s). The report includes a section on the strategy which was developed for the effort to extend the qualified lives of the Conax EPAs. A review of documentation and plant conditions specific to BGE is included in the report to demonstrate the methodology. The documentation included qualification testing performed by Conax of the materials of construction of the EPA models. The plant conditions reviewed included both normal and accident environments, both of which are specific to Calvert Cliffs Nuclear Power Plant Units 1 and 2. This report can be used as a guide in the evaluation of similar installations of Conax electrical penetration assemblies in other nuclear power plants by applying the methodologies used herein in conjunction with the plant specific test reports, materials, and conditions

  4. Data qualification summary for 1985 L-Area AC Flow Tests

    International Nuclear Information System (INIS)

    Edwards, T.B.; Eghbali, D.A.; Liebmann, M.L.; Shine, E.P.

    1992-03-01

    The 1985 L-Area AC Flow Tests were conducted to provide an extended data base for upgrading the reactor system models employed in predicting normal process water flows. This report summarizes the results of the recently completed, formal, technical review of the data from the 1985 L-Area AC Flow Tests as detailed in document SCS-CMAS-910045. The purpose of that review was to provide corroborating technical information as to the quality (fitness for use) of these experimental data. Reference [1] required three volumes to fully document the results of that Data Qualification process. This report has been prepared to provide the important conclusions from that process in a manageable and understandable format. Consult reference [1] if any additional information or detail is needed. This report provides highlights from that study: an overview of the tests and data, a description of the instrumentation used, an explanation of the data qualification methods employed to review the data, and the important conclusions reached from the study. Reference 1: Edwards, T.B., D.A. Eghbali, M.L. Liebmann, and E.P. Shine, open-quotes Data Qualification for 1985 L-Area AC Flow Tests,close quotes SCS-CMAS-910045, December 31, 1991

  5. Characterization Of The As-Received Sludge Batch 9 Qualification Sample (Htf-51-15-81)

    Energy Technology Data Exchange (ETDEWEB)

    Pareizs, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-09-30

    Savannah River National Laboratory (SRNL) personnel have been requested to qualify the next sludge batch (Sludge Batch 9 – SB9) for processing at the Defense Waste Processing Facility (DWPF). To accomplish this task, Savannah River Remediation (SRR) has sent SRNL a 3-L slurried sample of Tank 51H (HTF-51-15-81) to be characterized, washed, and then used in a lab-scale demonstration of the DWPF flowsheet (potentially after combining with Tank 40H sludge). This report documents the first steps of the qualification process – characterization of the as-received Tank 51H qualification sample. These results will be used to support a reprojection of SB9 by SRR from which final Tank 51H washing, frit development, and Chemical Processing Cell (CPC) activities will be based.

  6. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction.

  7. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 2

    International Nuclear Information System (INIS)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction

  8. Prototypes in engineering design: Definitions and strategies

    DEFF Research Database (Denmark)

    Jensen, Lasse Skovgaard; Özkil, Ali Gürcan; Mortensen, Niels Henrik

    2016-01-01

    By reviewing literature, we investigate types, purposes and definitions of prototypes. There is no overarching definition of a prototype, but we identify five categories of prototypes in litterature. We further synthesize and reference previous work to create an overview of aspects in prototyping...

  9. Prototyping in theory and in practice

    DEFF Research Database (Denmark)

    Yu, Fei; Brem, Alexander; Pasinell, Michele

    2018-01-01

    and functions of a prototype and needed to meet specific goals in order to push the process forward. Designers, on the other hand, used prototypes to investigate the design space for new possibilities, and were more open to a variety of prototyping materials and tools, especially for low-fidelity prototypes...

  10. Rapid Prototyping of Formally Modelled Distributed Systems

    OpenAIRE

    Buchs, Didier; Buffo, Mathieu; Titsworth, Frances M.

    1999-01-01

    This paper presents various kinds of prototypes, used in the prototyping of formally modelled distributed systems. It presents the notions of prototyping techniques and prototype evolution, and shows how to relate them to the software life-cycle. It is illustrated through the use of the formal modelling language for distributed systems CO-OPN/2.

  11. Towards an Operational Framework for Architectural Prototyping

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    2005-01-01

    We use a case study in architectural prototyping as input for presenting a first, tentative, framework describing key concepts and their relationships in architectural prototyping processes.......We use a case study in architectural prototyping as input for presenting a first, tentative, framework describing key concepts and their relationships in architectural prototyping processes....

  12. Engineering prototypes for theta-pinch devices

    International Nuclear Information System (INIS)

    Hansborough, L.D.; Hammer, C.F.; Hanks, K.W.; McDonald, T.E.; Nunnally, W.C.

    1975-01-01

    Past, present, and future engineering prototypes for theta-pinch plasma-physics devices at Los Alamos Scientific Laboratory are discussed. Engineering prototypes are designed to test and evaluate all components under system conditions expected on actual plasma-physics experimental devices. The importance of engineering prototype development increases as the size and complexity of the plasma-physics device increases. Past experiences with the Scyllac prototype and the Staged Theta-Pinch prototype are discussed and evaluated. The design of the proposed Staged Scyllac prototype and the Large Staged Scyllac implosion prototype assembly are discussed

  13. Science with the ASTRI prototype

    International Nuclear Information System (INIS)

    Sartore, Nicola

    2013-01-01

    ASTRI (Astrofisica a Specchi con Tecnologia Replicante Italiana) is a “Flagship Project” financed by the Italian Ministry of Instruction, University and Research and led by the Italian National Institute of Astrophysics. It represents the Italian proposal for the development of the Small Size Telescope system of the Cherenkov Telescope Array, the next generation observatory for Very High Energy gamma-rays (20 GeV - 100 TeV). The ASTRI end-to-end prototype will be installed at Serra La Nave (Catania, Italy) and it will see the first light at the beginning of 2014. We describe the expected performance of the prototype on few selected test cases of the northern emisphere. The aim of the prototype is to probe the technological solutions and the nominal performance of the various telescope's subsystems

  14. Flight Telerobotic Servicer prototype simulator

    Science.gov (United States)

    Schein, Rob; Krauze, Linda; Hartley, Craig; Dickenson, Alan; Lavecchia, Tom; Working, Bob

    A prototype simulator for the Flight Telerobotic Servicer (FTS) system is described for use in the design development of the FTS, emphasizing the hand controller and user interface. The simulator utilizes a graphics workstation based on rapid prototyping tools for systems analyses of the use of the user interface and the hand controller. Kinematic modeling, manipulator-control algorithms, and communications programs are contained in the software for the simulator. The hardwired FTS panels and operator interface for use on the STS Orbiter are represented graphically, and the simulated controls function as the final FTS system configuration does. The robotic arm moves based on the user hand-controller interface, and the joint angles and other data are given on the prototype of the user interface. This graphics simulation tool provides the means for familiarizing crewmembers with the FTS system operation, displays, and controls.

  15. Registration document 2005; Document de reference 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This reference document of Gaz de France provides information and data on the Group activities in 2005: financial informations, business, activities, equipments factories and real estate, trade, capital, organization charts, employment, contracts and research programs. (A.L.B.)

  16. 2002 reference document; Document de reference 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This 2002 reference document of the group Areva, provides information on the society. Organized in seven chapters, it presents the persons responsible for the reference document and for auditing the financial statements, information pertaining to the transaction, general information on the company and share capital, information on company operation, changes and future prospects, assets, financial position, financial performance, information on company management and executive board and supervisory board, recent developments and future prospects. (A.L.B.)

  17. Novel qualification methodology for subsea processing

    Energy Technology Data Exchange (ETDEWEB)

    Nilsen, Paal Jahre; Bratfos, Hans A. [Det Norske Veritas, Oslo (Norway)

    2004-07-01

    The purpose of the Reliability Analysis is to quantify the overall reliability of the technology to confirm that the functional requirements and the target reliability laid down in the Qualification Basis are met. On this basis DNV may issue a Statement of Fitness for Service affirming that the technology is considered qualified. Although a technology may be convincingly proven fit for service without using reliability measures, a quantified reliability makes the technology more competitive in a business where profitability is directly related to the reliability of the technology. In this respect it should also be noted that a reliability analysis require specific input data that sometimes must be derived by testing. It is therefore important to take this into consideration already in the selection and planning of qualification methods. (author)

  18. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  19. Essential elements of an effective data qualification

    International Nuclear Information System (INIS)

    Jenkins, E.W.

    1994-01-01

    Before data is used in any statistical evaluation, it should be subjected to a thorough data qualification to ensure its integrity. Data Qualification efforts may vary in scope but should all contain certain basic elements. Outliers should be eliminated so that any estimates obtained from the data will not be overly biased. Plots may be generated to uncover potential outliers, and these observations can be confirmed as being anomalous through the use of statistical testing. Non-stationarity of the data (i.e., time trends) may also be initially identified through the use of plots and confirmed by the results of statistical analyses, e.g., the use of the Kendall's tau statistic. When the dataset has been qualified, replicates and duplicates should be averaged to create a pseudo-independence between data points. An algorithm based on the groundwater data from the Savannah River Site has been used by the Applied Statistics Group at Westinghouse Savannah River Company for this

  20. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  1. Axure RP 6 Prototyping Essentials

    CERN Document Server

    Schwartz, Ezra

    2012-01-01

    Axure RP 6 Prototyping Essentials is a detailed, practical primer on the leading rapid prototyping tool. Short on jargon and high on concepts, real-life scenarios and step-by-step guidance through hands-on examples, this book will show you how to integrate Axure into your UX workflow. This book is written for UX practitioners, business analysts, product managers, and anyone else who is involved in UX projects. The book assumes that you have no or very little familiarity with Axure. It will help you if you are evaluating the tool for an upcoming project or are required to quickly get up to spee

  2. The DWPF waste form qualification program

    International Nuclear Information System (INIS)

    Marra, S.L.; Plodinec, M.J.

    1994-01-01

    Prior to the introduction of radioactive feed into the Defense Waste Processing Facility for immobilization in borosilicate glass an extensive waste qualification program must be completed. The DWPF must demonstrate its ability to comply with the Waste Acceptance Product Specifications. This ability is being demonstrated through laboratory and pilot scale work and will be completed after the full operation of the DWPF using various simulated feeds

  3. Biointrusion test plan for the Permanent Isolation Surface Barrier Prototype

    International Nuclear Information System (INIS)

    Link, S.O.; Cadwell, L.L.; Brandt, C.A.; Downs, J.L.; Rossi, R.E.; Gee, G.W.

    1994-04-01

    This document provides a testing and monitoring plan for the biological component of the prototype barrier slated for construction at the Hanford Site. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system. It is designed to permanently isolate waste from the biosphere. The features of the barrier include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, covered with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype barrier over the next several years to evaluate barrier performance under extreme climatic conditions. Plants and animals will play a significant role in the hydrologic and water and wind erosion characteristics of the prototype barrier. Studies on the biological component of the prototype barrier will include work on the initial revegetation of the surface, continued monitoring of the developing plant community, rooting depth and dispersion in the context of biointrusion potential, the role of plants in the hydrology of the surface and toe regions of the barrier, the role of plants in stabilizing the surface against water and wind erosion, and the role of burrowing animals in the hydrology and water and wind erosion of the barrier

  4. Qualification standard for photovoltaic concentrator modules

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.; Kurtz, S.; Bottenberg, W. R.; Hammond, R.; Jochums, S. W.; McDanal, A. J.; Roubideaux, D.; Whitaker, C.; Wohlgemuth, J.

    2000-05-05

    The paper describes a proposed qualification standard for photovoltaic concentrator modules. The standard's purpose is to provide stress tests and procedures to identify any component weakness in photovoltaic concentrator modules intended for power generation applications. If no weaknesses are identified during qualification, both the manufacturer and the customer can expect a more reliable product. The qualification test program for the standard includes thermal cycles, humidity-freeze cycles, water spray, off-axis beam damage, hail impact, hot-spot endurance, as well as electrical tests for performance, ground continuity, isolation, wet insulation resistance, and bypass diodes. Because concentrator module performance can not be verified using solar simulator and reference cell procedures suitable for flat-plate modules, the standard specifies an outdoor I-V test analysis allowing a performance comparison before and after a test procedure. Two options to this complex analysis are the use of a reference concentrator module for side-by-side outdoor comparison with modules undergoing various tests and a dark I-V performance check.

  5. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  6. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  7. Web document engineering

    International Nuclear Information System (INIS)

    White, B.

    1996-05-01

    This tutorial provides an overview of several document engineering techniques which are applicable to the authoring of World Wide Web documents. It illustrates how pre-WWW hypertext research is applicable to the development of WWW information resources

  8. Enterprise Document Management

    Data.gov (United States)

    US Agency for International Development — The function of the operation is to provide e-Signature and document management support for Acquisition and Assisitance (A&A) documents including vouchers in...

  9. WIPP documentation plan

    International Nuclear Information System (INIS)

    Plung, D.L.; Montgomery, T.T.; Glasstetter, S.R.

    1986-01-01

    In support of the programs at the Waste Isolation Pilot Plant (WIPP), the Publications and Procedures Section developed a documentation plan that provides an integrated document hierarchy; further, this plan affords several unique features: 1) the format for procedures minimizes the writing responsibilities of the technical staff and maximizes use of the writing and editing staff; 2) review cycles have been structured to expedite the processing of documents; and 3) the numbers of documents needed to support the program have been appreciably reduced

  10. NMS Prototype development final report

    International Nuclear Information System (INIS)

    Lepetich, J.E.

    1993-01-01

    Program for development of NMS prototype for LAMPF consisted of 5 tasks: crystal procurement specification, inspection/evaluation of CsI crystals, design/fabrication of crystal housing, design/fabrication of PMT shields, and packaging of crystals in the housing

  11. EUSO-TA prototype telescope

    Energy Technology Data Exchange (ETDEWEB)

    Bisconti, Francesca, E-mail: francesca.bisconti@kit.edu

    2016-07-11

    EUSO-TA is one of the prototypes developed for the JEM-EUSO project, a space-based large field-of-view telescope to observe the fluorescence light emitted by cosmic ray air showers in the atmosphere. EUSO-TA is a ground-based prototype located at the Telescope Array (TA) site in Utah, USA, where an Electron Light Source and a Central Laser Facility are installed. The purpose of the EUSO-TA project is to calibrate the prototype with the TA fluorescence detector in presence of well-known light sources and cosmic ray air showers. In 2015, the detector started the first measurements and tests using the mentioned light sources have been performed successfully. A first cosmic ray candidate has been observed, as well as stars of different magnitude and color index. Since Silicon Photo-Multipliers (SiPMs) are very promising for fluorescence telescopes of next generation, they are under consideration for the realization of a new prototype of EUSO Photo Detector Module (PDM). The response of this sensor type is under investigation through simulations and laboratory experimentation.

  12. The OPAL vertex detector prototype

    International Nuclear Information System (INIS)

    Roney, J.M.; Armitage, J.C.; Carnegie, R.K.; Giles, G.L.; Hemingway, R.J.; McPherson, A.C.; Pinfold, J.L.; Waterhouse, J.; Godfrey, L.; Hargrove, C.K.

    1989-01-01

    The prototype test results of a high resolution charged particle tracking detector are reported. The detector is designed to measure vertex topologies of particles produced in the e + e - collisions of the OPAL experiment at LEP. The OPAL vertex detector is a 1 m long, 0.46 m diameter cylindrical drift chamber consisting of an axial and stereo layer each of which is divided into 36 jet cells. A prototype chamber containing four axial and two stereo cells was studied using a pion test beam at CERN. The studies examined the prototype under a variety of operating conditions. An r-Φ resolution of 60 μm was obtained when the chamber was operated with argon (50%)-ethane (50%) at 3.75 bar, and when CO 2 (80%)-isobutane (20%) at 2.5 bar was used a 25 μm resolution was achieved. A z measurement using end-to-end time difference has a resolution of 3.5 cm. The details of these prototype studies are discussed in this paper. (orig.)

  13. Rapid Prototyping Enters Mainstream Manufacturing.

    Science.gov (United States)

    Winek, Gary

    1996-01-01

    Explains rapid prototyping, a process that uses computer-assisted design files to create a three-dimensional object automatically, speeding the industrial design process. Five commercially available systems and two emerging types--the 3-D printing process and repetitive masking and depositing--are described. (SK)

  14. Encapsulation of polymer photovoltaic prototypes

    DEFF Research Database (Denmark)

    Krebs, Frederik C

    2006-01-01

    A simple and efficient method for the encapsulation of polymer and organic photovoltaic prototypes is presented. The method employs device preparation on glass substrates with subsequent sealing using glass fiber reinforced thermosetting epoxy (prepreg) against a back plate. The method allows...

  15. EUSO-TA prototype telescope

    Science.gov (United States)

    Bisconti, Francesca; JEM-EUSO Collaboration

    2016-07-01

    EUSO-TA is one of the prototypes developed for the JEM-EUSO project, a space-based large field-of-view telescope to observe the fluorescence light emitted by cosmic ray air showers in the atmosphere. EUSO-TA is a ground-based prototype located at the Telescope Array (TA) site in Utah, USA, where an Electron Light Source and a Central Laser Facility are installed. The purpose of the EUSO-TA project is to calibrate the prototype with the TA fluorescence detector in presence of well-known light sources and cosmic ray air showers. In 2015, the detector started the first measurements and tests using the mentioned light sources have been performed successfully. A first cosmic ray candidate has been observed, as well as stars of different magnitude and color index. Since Silicon Photo-Multipliers (SiPMs) are very promising for fluorescence telescopes of next generation, they are under consideration for the realization of a new prototype of EUSO Photo Detector Module (PDM). The response of this sensor type is under investigation through simulations and laboratory experimentation.

  16. Facial Prototype Formation in Children.

    Science.gov (United States)

    Inn, Donald; And Others

    This study examined memory representation as it is exhibited in young children's formation of facial prototypes. In the first part of the study, researchers constructed images of faces using an Identikit that provided the features of hair, eyes, mouth, nose, and chin. Images were varied systematically. A series of these images, called exemplar…

  17. Documenting Employee Conduct

    Science.gov (United States)

    Dalton, Jason

    2009-01-01

    One of the best ways for a child care program to lose an employment-related lawsuit is failure to document the performance of its employees. Documentation of an employee's performance can provide evidence of an employment-related decision such as discipline, promotion, or discharge. When properly implemented, documentation of employee performance…

  18. Documents preparation and review

    International Nuclear Information System (INIS)

    1999-01-01

    Ignalina Safety Analysis Group takes active role in assisting regulatory body VATESI to prepare various regulatory documents and reviewing safety reports and other documentation presented by Ignalina NPP in the process of licensing of unit 1. The list of main documents prepared and reviewed is presented

  19. QUALIFICATIONS FRAMEWORKS FOR LIFELONG LEARNING CONQUERING THE WORLD?

    Directory of Open Access Journals (Sweden)

    Arjen Deij

    2014-01-01

    Full Text Available The paper reveals the international prospects of developing and spreading the qualifications frameworks across the globe. It introduces the key terms and concepts related to the given issue, and examines both the benefits and challenges of qualifications frameworks implementation. The author looks into the origins and causes of the worldwide interest in qualifications framework application, and gives the overview of related recent publications and their conclusions to reinforce the provided argumentation.

  20. On relaxing the Mangasarian-Fromovitz constraint qualification

    Czech Academy of Sciences Publication Activity Database

    Kruger, A.Y.; Minchenko, L.; Outrata, Jiří

    2014-01-01

    Roč. 18, č. 1 (2014), s. 171-189 ISSN 1385-1292 R&D Projects: GA ČR GAP402/12/1309 Institutional support: RVO:67985556 Keywords : Nonlinear programming * Regularity conditions * Constraint qualifications * Lagrange multipliers * Mangasarian–Fromovitz constraint qualification * Constant rank constraint qualification Subject RIV: BA - General Mathematics Impact factor: 0.679, year: 2014 http://library.utia.cas.cz/separaty/2014/MTR/outrata-0426110.pdf

  1. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    The overall training system and the development projects of training the staff of all categories from NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce were the subject of UJD's attention. During 2001 following inspections were carried out on nuclear personnel training: - PP's Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff; - Mochovce NPP: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; - SE-VYZ: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff. Training the staff of the NPP's Bohunice: - The fundamental and periodical theoretical training as sure as the fundamental and periodical simulator training is carried out by the VUJE Training centre in Trnava. - The fundamental practical training in the workplace and training for the change work- rank is carried at Bohunice plant. Training of the staff of the NPP Mochovce: - The fundamental and periodical theoretical training is carried out by the VUJE Training centre in Trnava. The fundamental practical training in the workplace and training for the change work- rank as well as the fundamental and periodical simulator training is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues a certificate on special professional skills of selected staff members of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: 1. Scientific shift manager for start up with the right of manipulation; 2. Shift supervisor; 3. Unit supervisor; 4. Primary circuit operator; 5. Secondary circuit operator; 6. Reactor physicist; 7. Scientific shift manager for start up without the right of manipulation. Examinations of

  2. Prototype diagnosis of psychiatric syndromes

    Science.gov (United States)

    WESTEN, DREW

    2012-01-01

    The method of diagnosing patients used since the early 1980s in psychiatry, which involves evaluating each of several hundred symptoms for their presence or absence and then applying idiosyncratic rules for combining them for each of several hundred disorders, has led to great advances in research over the last 30 years. However, its problems have become increasingly apparent, particularly for clinical practice. An alternative approach, designed to maximize clinical utility, is prototype matching. Instead of counting symptoms of a disorder and determining whether they cross an arbitrary cutoff, the task of the diagnostician is to gauge the extent to which a patient’s clinical presentation matches a paragraph-length description of the disorder using a simple 5-point scale, from 1 (“little or no match”) to 5 (“very good match”). The result is both a dimensional diagnosis that captures the extent to which the patient “has” the disorder and a categorical diagnosis, with ratings of 4 and 5 corresponding to presence of the disorder and a rating of 3 indicating “subthreshold” or “clinically significant features”. The disorders and criteria woven into the prototypes can be identified empirically, so that the prototypes are both scientifically grounded and clinically useful. Prototype diagnosis has a number of advantages: it better captures the way humans naturally classify novel and complex stimuli; is clinically helpful, reliable, and easy to use in everyday practice; facilitates both dimensional and categorical diagnosis and dramatically reduces the number of categories required for classification; allows for clinically richer, empirically derived, and culturally relevant classification; reduces the gap between research criteria and clinical knowledge, by allowing clinicians in training to learn a small set of standardized prototypes and to develop richer mental representations of the disorders over time through clinical experience; and can help

  3. Prototype Effect and the Persuasiveness of Generalizations.

    Science.gov (United States)

    Dahlman, Christian; Sarwar, Farhan; Bååth, Rasmus; Wahlberg, Lena; Sikström, Sverker

    An argument that makes use of a generalization activates the prototype for the category used in the generalization. We conducted two experiments that investigated how the activation of the prototype affects the persuasiveness of the argument. The results of the experiments suggest that the features of the prototype overshadow and partly overwrite the actual facts of the case. The case is, to some extent, judged as if it had the features of the prototype instead of the features it actually has. This prototype effect increases the persuasiveness of the argument in situations where the audience finds the judgment more warranted for the prototype than for the actual case (positive prototype effect), but decreases persuasiveness in situations where the audience finds the judgment less warranted for the prototype than for the actual case (negative prototype effect).

  4. Supporting Active User Involvment in Prototyping

    DEFF Research Database (Denmark)

    Grønbæk, Kaj

    1990-01-01

    The term prototyping has in recent years become a buzzword in both research and practice of system design due to a number of claimed advantages of prototyping techniques over traditional specification techniques. In particular it is often stated that prototyping facilitates the users' involvement...... in the development process. But prototyping does not automatically imply active user involvement! Thus a cooperative prototyping approach aiming at involving users actively and creatively in system design is proposed in this paper. The key point of the approach is to involve users in activities that closely couple...... development of prototypes to early evaluation of prototypes in envisioned use situations. Having users involved in such activities creates new requirements for tool support. Tools that support direct manipulation of prototypes and simulation of behaviour have shown promise for cooperative prototyping...

  5. Prototyping of user interfaces for mobile applications

    CERN Document Server

    Bähr, Benjamin

    2017-01-01

    This book investigates processes for the prototyping of user interfaces for mobile apps, and describes the development of new concepts and tools that can improve the prototype driven app development in the early stages. It presents the development and evaluation of a new requirements catalogue for prototyping mobile app tools that identifies the most important criteria such tools should meet at different prototype-development stages. This catalogue is not just a good point of orientation for designing new prototyping approaches, but also provides a set of metrics for a comparing the performance of alternative prototyping tools. In addition, the book discusses the development of Blended Prototyping, a new approach for prototyping user interfaces for mobile applications in the early and middle development stages, and presents the results of an evaluation of its performance, showing that it provides a tool for teamwork-oriented, creative prototyping of mobile apps in the early design stages.

  6. Approach to customer qualification of the BNFL Sellafield Mox Plant

    International Nuclear Information System (INIS)

    Sullivan, P.

    2003-01-01

    BNFL started plutonium commissioning of its Sellafield MOX Plant (SMP) in December 2001, with the first MOX pellets being produced in May 2002. SMP was designed to manufacture a range of both PWR and BWR fuel types for a number of different customers. During commissioning and early MOX fuel manufacturing BNFL has been demonstrating its ability to both automatically manufacture and inspect MOX fuel to meet the requirements of different customers' specifications and fuel types. The qualification project consisted of common and project specific qualification. Common qualification was carried out to demonstrate BNFL could meet several customers' requirements during the same qualification test. Project specific qualification was carried out for one customer only as the fabrication or inspection equipment was specific to their fuel type. An example is the fuel assembly process. The reasons for BNFL carrying out common qualification were: - Develop a common qualified process to meet different customer specifications. - Minimise future qualifications prior to starting future fuel campaigns. - Ensure BNFL understands and effectively manages different customer requirements in SMP. BNFL has approached qualification of SMP systematically. Firstly the inspection system was qualified, and once completed the inspection system was then used in the qualification of the manufacturing process. (orig.)

  7. Seismic qualification testing at the National Engineering Laboratory

    International Nuclear Information System (INIS)

    Fairbairn, J.

    1984-01-01

    Servohydraulic shaker tables have been developed for the simulation of vibration environments including earthquakes. The use of these facilities for seismic qualification of nuclear equipment is described. (author)

  8. 77 FR 10607 - Qualification of Drivers; Exemption Applications; Diabetes Mellitus

    Science.gov (United States)

    2012-02-22

    ...-2011-0367] Qualification of Drivers; Exemption Applications; Diabetes Mellitus AGENCY: Federal Motor... diabetes mellitus (ITDM) from operating commercial motor vehicles (CMVs) in interstate commerce. The...). [[Page 10608

  9. Seismic qualification of existing nuclear installations in India - a proposal

    International Nuclear Information System (INIS)

    Basu, P.C.

    2001-01-01

    In India, the work toward seismic qualification of existing nuclear facilities has been started. Preliminary work is being undertaken with respect to identifying the facilities which would be taken up for seismic qualification, approach and methodology for re-evaluation for seismic safety, acceptance criteria, etc. Work has also been started for framing up the criteria and methodology of the seismic qualification of these facilities. Present paper contains the proposal in this respect. This proposal is on similar lines of the present practice of seismic qualification of NPP, as summarized in the Appendix, but has been modified to suit the special requirements of Indian nuclear installations. (author)

  10. Starlink Document Styles

    Science.gov (United States)

    Lawden, M. D.

    This document describes the various styles which are recommended for Starlink documents. It also explains how to use the templates which are provided by Starlink to help authors create documents in a standard style. This paper is concerned mainly with conveying the ``look and feel" of the various styles of Starlink document rather than describing the technical details of how to produce them. Other Starlink papers give recommendations for the detailed aspects of document production, design, layout, and typography. The only style that is likely to be used by most Starlink authors is the Standard style.

  11. Subject (of documents)

    DEFF Research Database (Denmark)

    Hjørland, Birger

    2017-01-01

    This article presents and discuss the concept “subject” or subject matter (of documents) as it has been examined in library and information science (LIS) for more than 100 years. Different theoretical positions are outlined and it is found that the most important distinction is between document......-oriented views versus request-oriented views. The document-oriented view conceive subject as something inherent in documents, whereas the request-oriented view (or the policy based view) understand subject as an attribution made to documents in order to facilitate certain uses of them. Related concepts...

  12. Design in action: From prototyping by demonstration to cooperative prototyping

    DEFF Research Database (Denmark)

    Bødker, Susanne; Grønbæk, Kaj

    1991-01-01

    ... the development of any computer-based system will have to proceed in a cycle from design to experience and back again. It is impossible to anticipate all of the relevant breakdown and their domains. They emerge gradually in practice. Winograd and Flores, 1986. p.171 Some time ago we worked wi...... with a group of dental assistants, designing a prototype case record system to explore the possibility of using computer support in public dental clinics. ...

  13. Hanford Waste Vitrification Plant Quality Assurance Program description for defense high-level waste form development and qualification

    International Nuclear Information System (INIS)

    Hand, R.L.

    1992-01-01

    This document describes the quality assurance (QA) program of the Hanford Waste Vitrification Plant (HWVP) Project. The purpose of the QA program is to control project activities in such a manner as to achieve the mission of the HWVP Project in a safe and reliable manner. A major aspect of the HWVP Project QA program is the control of activities that relate to high-level waste (HLW) form development and qualification. This document describes the program and planned actions the Westinghouse Hanford Company (Westinghouse Hanford) will implement to demonstrate and ensure that the HWVP Project meets the US Department of Energy (DOE) and ASME regulations. The actions for meeting the requirements of the Waste Acceptance Preliminary Specifications (WAPS) will be implemented under the HWVP product qualification program with the objective of ensuring that the HWVP and its processes comply with the WAPS established by the federal repository

  14. SAMPLE RESULTS FROM THE INTEGRATED SALT DISPOSITION PROGRAM MACROBATCH 5 TANK 21H QUALIFICATION MST, ESS AND PODD SAMPLES

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T.; Fink, S.

    2012-04-24

    Savannah River National Laboratory (SRNL) performed experiments on qualification material for use in the Integrated Salt Disposition Program (ISDP) Batch 5 processing. This qualification material was a composite created from recent samples from Tank 21H and archived samples from Tank 49H to match the projected blend from these two tanks. Additionally, samples of the composite were used in the Actinide Removal Process (ARP) and extraction-scrub-strip (ESS) tests. ARP and ESS test results met expectations. A sample from Tank 21H was also analyzed for the Performance Objectives Demonstration Document (PODD) requirements. SRNL was able to meet all of the requirements, including the desired detection limits for all the PODD analytes. This report details the results of the Actinide Removal Process (ARP), Extraction-Scrub-Strip (ESS) and Performance Objectives Demonstration Document (PODD) samples of Macrobatch (Salt Batch) 5 of the Integrated Salt Disposition Program (ISDP).

  15. Questions of qualification exam for non-destructive testing and materials science - the first level

    International Nuclear Information System (INIS)

    Shaaban, H.I.; Addarwish, J.M.A.

    2013-01-01

    The book contains seven chapters: Questions of qualification for magnetic particles testing method - Questions of qualification for liquids penetrant testing method - Questions of qualification for the visual inspection testing method - Questions of qualification for the ultrasonic testing method - Questions of qualification for the eddy current testing method - Questions of rehabilitation for industrial radiographic testing method - Qualification questions about materials science and manufacturing defects of castings and welding and comparison between non-destructive testing methods.

  16. Qualification of safety-critical software for digital reactor safety system in nuclear power plants

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Park, Gee-Yong; Kim, Jang-Yeol; Lee, Jang-Soo

    2013-01-01

    This paper describes the software qualification activities for the safety-critical software of the digital reactor safety system in nuclear power plants. The main activities of the software qualification processes are the preparation of software planning documentations, verification and validation (V and V) of the software requirements specifications (SRS), software design specifications (SDS) and codes, and the testing of the integrated software and integrated system. Moreover, the software safety analysis and software configuration management are involved in the software qualification processes. The V and V procedure for SRS and SDS contains a technical evaluation, licensing suitability evaluation, inspection and traceability analysis, formal verification, software safety analysis, and an evaluation of the software configuration management. The V and V processes for the code are a traceability analysis, source code inspection, test case and test procedure generation. Testing is the major V and V activity of the software integration and system integration phases. The software safety analysis employs a hazard operability method and software fault tree analysis. The software configuration management in each software life cycle is performed by the use of a nuclear software configuration management tool. Through these activities, we can achieve the functionality, performance, reliability, and safety that are the major V and V objectives of the safety-critical software in nuclear power plants. (author)

  17. Implementation plans for the Korean certified tumor registrar qualification system.

    Science.gov (United States)

    Boo, Yoo-Kyung; Lim, Hyun-Sook; Won, Young-Joo

    2014-01-01

    Cancer registration data is used to understand the nation's cancer burden, and to provide significant baseline data for cancer control efforts, as well as, research on cancer incidence, mortality, survival, and prevalence. A system that approves, assesses, and manages the qualification of specialists, responsible for performing cancer registration, has not been developed in Korea. This study presents ways to implement a certification system designed for the qualification of tumor registrars in Korea. Requirements for implementing a certified tumor registrar qualification system were determined by reviewing the system for establishing qualifications in Korea and the American qualification system via the National Cancer Registrars Association (NCRA). Moreover, a survey was conducted on Korean medical records administrators, who had taken the U.S. Certified Tumor Registrar (CTR) examination, in order to review their opinions regarding these requirements. This study verified the feasibility of a qualification examination based on the opinions of CTR specialists by determining the following: items, and the associated ratings, of the qualifications necessary to register individuals as certified tumor registrars in a private qualification system; status of human resources required for the examination or training processes; plans regarding the organization needed for management, and operation of qualifications, examination standards, subject areas, examination methods, examination qualifications, or education and training programs. The implementation of a certified tumor registrar qualification system will lead to enhanced job competency for specialists and a qualitative improvement of cancer registration data. It will also reliably foster human resources that will lay the groundwork needed to establish scientific and reasonable national cancer management policies.

  18. Test report: Electron-proton spectrometer qualification test unit, qualification test

    Science.gov (United States)

    Vincent, D. L.

    1972-01-01

    Qualification tests of the electron-proton spectrometer test unit are presented. The tests conducted were: (1) functional, (2) thermal/vacuum, (3) electromagnetic interference, (4) acoustic, (5) shock, (6) vibration, and (7) humidity. Results of each type of test are presented in the form of data sheets.

  19. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2001-01-01

    The overall training system and the development of projects for training of all categories of NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce staff were the subject of Nuclear Regulatory Authority of the Slovak Republic (UJD) attention. During 2000, the following inspections were carried out on nuclear personnel training: (a) NPP Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff ; (b) NPP Mochovce: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; an inspection focused on verifying the simulator aided training; an inspection focused on checking the preparedness of NPP Mochovce operation and technical personnel for NPP Mochovce Unit 2 operation; (c) Technology for treatment and conditioning of radioactive waste Bohunice (BSC): an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff; VUJE Trnava: verification of technical equipment and professional skills of VUJE Trnava staff and tasks arising out of the 'Authorisation on nuclear installation staff training'. Examinations of selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPPs. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under

  20. Prototype of sun projector device

    Science.gov (United States)

    Ihsan; Dermawan, B.

    2016-11-01

    One way to introduce astronomy to public, including students, can be handled by solar observation. The widely held device for this purpose is coelostat and heliostat. Besides using filter attached to a device such as telescope, it is safest to use indirect way for observing the Sun. The main principle of the indirect way is deflecting the sun light and projecting image of the sun on a screen. We design and build a simple and low-cost astronomical device, serving as a supplement to increase public service, especially for solar observation. Without using any digital and intricate supporting equipment, people can watch and relish image of the Sun in comfortable condition, i.e. in a sheltered or shady place. Here we describe a design and features of our prototype of the device, which still, of course, has some limitations. In the future, this prototype can be improved for more efficient and useful applications.

  1. Prototype and proposed ISABELLE dipoles

    International Nuclear Information System (INIS)

    McInturff, A.D.; Sampson, W.B.; Robins, K.E.; Dahl, P.F.; Damm, R.

    1977-01-01

    Data are presented on the latest dipole prototypes to update the operational parameters possible for ISABELLE. This data base will constantly expand until the start of construction of the storage rings. The data will include field quality, stray field magnitudes, quench temperature and propagation times, protection capabilities singly and in multiple units, maximum central fields obtained and training behavior. Performance of the dipoles versus temperature and mode of refrigeration will be discussed. The single layer cosine theta turns distribution coils' parameters are better than those required for the operation of the 200 x 200 GeV version of ISABELLE. The double layer prototype has exceeded the magnetic field performance and two dimensional quality of field needed for the 400 x 400 GeV version of ISABELLE

  2. Rapid mask prototyping for microfluidics.

    Science.gov (United States)

    Maisonneuve, B G C; Honegger, T; Cordeiro, J; Lecarme, O; Thiry, T; Fuard, D; Berton, K; Picard, E; Zelsmann, M; Peyrade, D

    2016-03-01

    With the rise of microfluidics for the past decade, there has come an ever more pressing need for a low-cost and rapid prototyping technology, especially for research and education purposes. In this article, we report a rapid prototyping process of chromed masks for various microfluidic applications. The process takes place out of a clean room, uses a commercially available video-projector, and can be completed in less than half an hour. We quantify the ranges of fields of view and of resolutions accessible through this video-projection system and report the fabrication of critical microfluidic components (junctions, straight channels, and curved channels). To exemplify the process, three common devices are produced using this method: a droplet generation device, a gradient generation device, and a neuro-engineering oriented device. The neuro-engineering oriented device is a compartmentalized microfluidic chip, and therefore, required the production and the precise alignment of two different masks.

  3. Prototyping the PANDA Barrel DIRC

    Energy Technology Data Exchange (ETDEWEB)

    Schwarz, C., E-mail: C.Schwarz@gsi.de [GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt (Germany); Kalicy, G.; Dzhygadlo, R.; Gerhardt, A.; Götzen, K.; Hohler, R.; Kumawat, H.; Lehmann, D.; Lewandowski, B.; Patsyuk, M.; Peters, K.; Schepers, G.; Schmitt, L.; Schwiening, J.; Traxler, M.; Zühlsdorf, M. [GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt (Germany); Dodokhov, V.Kh. [Joint Institute for Nuclear Research, Dubna (Russian Federation); Britting, A.; Eyrich, W.; Lehmann, A. [Friedrich Alexander-University of Erlangen-Nuremberg, Erlangen (Germany); and others

    2014-12-01

    The design of the Barrel DIRC detector for the future PANDA experiment at FAIR contains several important improvements compared to the successful BABAR DIRC, such as focusing and fast timing. To test those improvements as well as other design options a prototype was build and successfully tested in 2012 with particle beams at CERN. The prototype comprises a radiator bar, focusing lens, mirror, and a prism shaped expansion volume made of synthetic fused silica. An array of micro-channel plate photomultiplier tubes measures the location and arrival time of the Cherenkov photons with sub-nanosecond resolution. The development of a fast reconstruction algorithm allowed to tune construction details of the detector setup with test beam data and Monte-Carlo simulations.

  4. Customer-experienced rapid prototyping

    Science.gov (United States)

    Zhang, Lijuan; Zhang, Fu; Li, Anbo

    2008-12-01

    In order to describe accurately and comprehend quickly the perfect GIS requirements, this article will integrate the ideas of QFD (Quality Function Deployment) and UML (Unified Modeling Language), and analyze the deficiency of prototype development model, and will propose the idea of the Customer-Experienced Rapid Prototyping (CE-RP) and describe in detail the process and framework of the CE-RP, from the angle of the characteristics of Modern-GIS. The CE-RP is mainly composed of Customer Tool-Sets (CTS), Developer Tool-Sets (DTS) and Barrier-Free Semantic Interpreter (BF-SI) and performed by two roles of customer and developer. The main purpose of the CE-RP is to produce the unified and authorized requirements data models between customer and software developer.

  5. On ISI effectiveness through inspection qualification

    International Nuclear Information System (INIS)

    Harutyunov, R.

    2000-01-01

    There are two units of WWER type in the ANPP. The results of the implementation of the IAEA qualification guidelines for the ANPP Primary Circuit for WWER are presented. The control methods according to the ISI Program are foreseen in the design and implemented during the preparation for the unit 2 restart. The result of control is plugging of more tubes than during the last operation period. During the next years in the presence of the blowdown water activity, the search on defective tubes was performed by Lumhydraulic methods and the tubes were plugged by welding plugs. In 1999 was performed the visual control on the Steam Generator 6 by WNIAES experts and by the ANPP experts from the Metal Laboratory. The result is confirmation of the irreversible process on erosive-corrosion destruction of feed waters distribution header; definition of the defects coordinates defined; detection of sediments within the SG vessel surfaces and in the head exchanged surface tubes. The purpose of the ISI effectiveness improvement is to discover the defects in the base metal and in the welds before developing into a problem at operating level or a safety problem. For the solution on the specific problems at the ANPP the project for technological co-operation with IAEA has been developed. It is necessary to organize training, certification, assessment methodology. The expected results after the project implementation are to establish the base for the equipment qualification body and staff certification; to upgrade the ANPP staff qualification; to prepare a group of experts, supported by ANRA, which to be also involved in the development of NDM national regulators

  6. DOE's annealing prototype demonstration projects

    International Nuclear Information System (INIS)

    Warren, J.; Nakos, J.; Rochau, G.

    1997-01-01

    One of the challenges U.S. utilities face in addressing technical issues associated with the aging of nuclear power plants is the long-term effect of plant operation on reactor pressure vessels (RPVs). As a nuclear plant operates, its RPV is exposed to neutrons. For certain plants, this neutron exposure can cause embrittlement of some of the RPV welds which can shorten the useful life of the RPV. This RPV embrittlement issue has the potential to affect the continued operation of a number of operating U.S. pressurized water reactor (PWR) plants. However, RPV material properties affected by long-term irradiation are recoverable through a thermal annealing treatment of the RPV. Although a dozen Russian-designed RPVs and several U.S. military vessels have been successfully annealed, U.S. utilities have stated that a successful annealing demonstration of a U.S. RPV is a prerequisite for annealing a licensed U.S. nuclear power plant. In May 1995, the Department of Energy's Sandia National Laboratories awarded two cost-shared contracts to evaluate the feasibility of annealing U.S. licensed plants by conducting an anneal of an installed RPV using two different heating technologies. The contracts were awarded to the American Society of Mechanical Engineers (ASME) Center for Research and Technology Development (CRTD) and MPR Associates (MPR). The ASME team completed its annealing prototype demonstration in July 1996, using an indirect gas furnace at the uncompleted Public Service of Indiana's Marble Hill nuclear power plant. The MPR team's annealing prototype demonstration was scheduled to be completed in early 1997, using a direct heat electrical furnace at the uncompleted Consumers Power Company's nuclear power plant at Midland, Michigan. This paper describes the Department's annealing prototype demonstration goals and objectives; the tasks, deliverables, and results to date for each annealing prototype demonstration; and the remaining annealing technology challenges

  7. Encapsulation of polymer photovoltaic prototypes

    Energy Technology Data Exchange (ETDEWEB)

    Krebs, Frederik C. [The Danish Polymer Centre, RISOE National Laboratory, P.O. Box 49, DK-4000 Roskilde (Denmark)

    2006-12-15

    A simple and efficient method for the encapsulation of polymer and organic photovoltaic prototypes is presented. The method employs device preparation on glass substrates with subsequent sealing using glass fiber reinforced thermosetting epoxy (prepreg) against a back plate. The method allows for transporting oxygen and water sensitive devices outside a glove box environment after sealing and enables sharing of devices between research groups such that efficiency and stability can be evaluated in different laboratories. (author)

  8. Yucca Mountain project prototype testing

    International Nuclear Information System (INIS)

    Hughes, W.T.; Girdley, W.A.

    1990-01-01

    The U.S. DOE is responsible for characterizing the Yucca Mountain site in Nevada to determine its suitability for development as a geologic repository to isolate high-level nuclear waste for at least 10,000 years. This unprecedented task relies in part on measurements made with relatively new methods or applications, such as dry coring and overcoring for studies to be conducted from the land surface and in an underground facility. The Yucca Mountain Project has, since 1988, implemented a program of equipment development and methods development for a broad spectrum of hydrologic, geologic, rock mechanics, and thermomechanical tests planned for use in an Exploratory Shaft during site characterization at the Yucca Mountain site. A second major program was fielded beginning in April 1989 to develop and test methods and equipment for surface drilling to obtain core samples from depth using only air as a circulating medium. The third major area of prototype testing has been during the ongoing development of the Instrumentation/ Data Acquisition System (IDAS), designed to collect and monitor data from down-hole instrumentation in the unsaturated zone, and store and transmit the data to a central archiving computer. Future prototype work is planned for several programs including the application of vertical seismic profiling methods and flume design to characterizing the geology at Yucca Mountain. The major objectives of this prototype testing are to assure that planned Site Characterization testing can be carried out effectively at Yucca Mountain, both in the Exploratory Shaft Facility (ESF), and from the surface, and to avoid potential major failures or delays that could result from the need to re-design testing concepts or equipment. This paper will describe the scope of the Yucca Mountain Project prototype testing programs and summarize results to date. 3 figs

  9. Prototype Morphing Fan Nozzle Demonstrated

    Science.gov (United States)

    Lee, Ho-Jun; Song, Gang-Bing

    2004-01-01

    Ongoing research in NASA Glenn Research Center's Structural Mechanics and Dynamics Branch to develop smart materials technologies for aeropropulsion structural components has resulted in the design of the prototype morphing fan nozzle shown in the photograph. This prototype exploits the potential of smart materials to significantly improve the performance of existing aircraft engines by introducing new inherent capabilities for shape control, vibration damping, noise reduction, health monitoring, and flow manipulation. The novel design employs two different smart materials, a shape-memory alloy and magnetorheological fluids, to reduce the nozzle area by up to 30 percent. The prototype of the variable-area fan nozzle implements an overlapping spring leaf assembly to simplify the initial design and to provide ease of structural control. A single bundle of shape memory alloy wire actuators is used to reduce the nozzle geometry. The nozzle is subsequently held in the reduced-area configuration by using magnetorheological fluid brakes. This prototype uses the inherent advantages of shape memory alloys in providing large induced strains and of magnetorheological fluids in generating large resistive forces. In addition, the spring leaf design also functions as a return spring, once the magnetorheological fluid brakes are released, to help force the shape memory alloy wires to return to their original position. A computerized real-time control system uses the derivative-gain and proportional-gain algorithms to operate the system. This design represents a novel approach to the active control of high-bypass-ratio turbofan engines. Researchers have estimated that such engines will reduce thrust specific fuel consumption by 9 percent over that of fixed-geometry fan nozzles. This research was conducted under a cooperative agreement (NCC3-839) at the University of Akron.

  10. Using prototyping in software development

    OpenAIRE

    Šinkovec, Miha

    2010-01-01

    Today the business system changers faster than the usual conventional cascade life cycle. Because of that, we can conclude, that today's programming system will no longer be presented as the answer to this topic in the developing age of ever changing user requirements. Neither increased performance or higher productivity will decrease the problem. The appropriate solution to this stated problem is prototyping. Instead of building and developing the whole system, we build a module that can...

  11. Documentation of Improvement Competences

    DEFF Research Database (Denmark)

    Johansen, Jørn; Back, Karsten Kristensen; Korsaa, Morten

    2017-01-01

    This paper demonstrates how a report used in a Master in Project management and Process improvement training at Roskilde University Denmark can be used to evaluate if a student can pass the ECQA SPI Manager exam. It also demonstrates how the structure of the report addresses all necessary...... Manager job role, which is based on the SPI Manifesto and the ImprovAbilityTM model (part of ISO/IEC 33014 Guideline for Process Improvement) among other types of knowledge and research....... competences, which should or could be brought into play during the project – and therefor also in one way or another addresses the quality of the activated competences in the improvement project – a kind of qualification. The clue is that the structure of the report follows the units and element in the SPI...

  12. Iteration and Prototyping in Creating Technical Specifications.

    Science.gov (United States)

    Flynt, John P.

    1994-01-01

    Claims that the development process for computer software can be greatly aided by the writers of specifications if they employ basic iteration and prototyping techniques. Asserts that computer software configuration management practices provide ready models for iteration and prototyping. (HB)

  13. Technical qualification requirements and training programs for radiation protection personnel at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Copenhaver, E.D.; Houser, B.S.; Butler, H.M. Jr.; Bogard, J.S.; Fair, M.F.; Haynes, C.E.; Parzyck, D.C.

    1986-04-01

    This document deals with the policies and practices of the Environmental and Occupational Safety Division (EOSD) at the Oak Ridge National Laboratory (ORNL) in regard to the selection, training, qualification, and requalification of radiation protection staff assigned to reactor and nonreactor nuclear facilities. Included are personnel at facilities that: (1) operate reactors or particle accelerators; (2) produce, process, or store radioactive liquid or solid waste; (3) conduct separations operations; (4) engage in research with radioactive materials and radiation sources; and (5) conduct irradiated materials inspection, fuel fabrication, deconamination, or recovery operations. The EOSD personnel also have environmental surveillance and operational and industrial safety responsibilities related to the total Laboratory

  14. Qualification and training of quality assurance personnel

    International Nuclear Information System (INIS)

    Ribeiro da Costa, J.

    1980-01-01

    Introduction. Qualification and certification: definitions; approach of the problem. A first attempt for its solutions. The 'sample' course; results and conclusions. Planning a comprehensive program: results. Analysis and preliminary conclusions. Absorption of the know-how and planning further programs for training. Development and updating the general training course with the introduction of German experience - summary of results. General planning of a training course for quality and reliability are as for the next courses. Evaluation, grading and final results awarded to participants, as followed in QA-Training courses - certification. Future trends (tentative) - conclusions. (orig./RW)

  15. Qualification test and analysis report: solar collectors

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    Test results show that the Owens-Illinois Sunpak/sup TM/ Model SEC 601 air-cooled collector meets the national standards and codes as defined in the Subsystem Performance Specification and Verification Plan of NASA/MSFC Contract NAS8-32259, dated October 28, 1976. The architectural and engineering firm of Smith, Hinchman and Grylls, Detroit, Michigan, acted in the capacity of the independent certification agency. The program calls for the development, fabrication, qualification and delivery of an air-liquid solar collector for solar heating, combined heating and cooling, and/or hot water systems.

  16. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  17. Printing of Titanium implant prototype

    International Nuclear Information System (INIS)

    Wiria, Florencia Edith; Shyan, John Yong Ming; Lim, Poon Nian; Wen, Francis Goh Chung; Yeo, Jin Fei; Cao, Tong

    2010-01-01

    Dental implant plays an important role as a conduit of force and stress to flow from the tooth to the related bone. In the load sharing between an implant and its related bone, the amount of stress carried by each of them directly related to their stiffness or modulus. Hence, it is a crucial issue for the implant to have matching mechanical properties, in particular modulus, between the implant and its related bone. Titanium is a metallic material that has good biocompatibility and corrosion resistance. Whilst the modulus of the bulk material is still higher than that of bone, it is the lowest among all other commonly used metallic implant materials, such as stainless steel or cobalt alloy. Hence it is potential to further reduce the modulus of pure Titanium by engineering its processing method to obtain porous structure. In this project, porous Titanium implant prototype is fabricated using 3-dimensional printing. This technique allows the flexibility of design customization, which is beneficial for implant fabrication as tailoring of implant size and shape helps to ensure the implant would fit nicely to the patient. The fabricated Titanium prototype had a modulus of 4.8-13.2 GPa, which is in the range of natural bone modulus. The compressive strength achieved was between 167 to 455 MPa. Subsequent cell culture study indicated that the porous Titanium prototype had good biocompatibility and is suitable for bone cell attachment and proliferation.

  18. Scheme Program Documentation Tools

    DEFF Research Database (Denmark)

    Nørmark, Kurt

    2004-01-01

    are separate and intended for different documentation purposes they are related to each other in several ways. Both tools are based on XML languages for tool setup and for documentation authoring. In addition, both tools rely on the LAML framework which---in a systematic way---makes an XML language available...... as named functions in Scheme. Finally, the Scheme Elucidator is able to integrate SchemeDoc resources as part of an internal documentation resource....

  19. Results of a literature review on the environmental qualification of low-voltage electric cables

    International Nuclear Information System (INIS)

    Lofaro, R.; Lee, B.; Villaran, M.; Gleason, J.; Aggarwal, S.

    1995-01-01

    In the design of nuclear power plants in the US, safety-related electric equipment must be qualified to provide reasonable assurance it can withstand the effects of a design basis event (DBE) and still be able to perform its prescribed safety function, even if the accident were to occur at the end of its service life. The requirement for environmental qualification (EQ) originates from the General Design Criteria in the Code of Federal Regulations, Title 10, Part 50 (10 CFR 50). The acceptable method of performing the qualification of this equipment has evolved over the years, starting with the NRC Division of Operating Reactors (DOR) Guidelines, which were issued in Bulletin 79--01B, and NUREG-0588 requirements and ending with the current EQ Rule, 10 CFR 50.49. While the EQ methods described in these documents have the same overall objective, there are some notable differences for which a clear technical basis has not been established. One difference is the preaging requirement for equipment prior to LOCA testing. In addition, specific issues related to current EQ practices have been raised by the US NRC which need to be addressed. These issues, which are discussed in detail later in this paper, are related to the sources of conservatism and uncertainty in IEEE Standard 323--1974, which is the qualification standard currently endorsed by the NRC. To address these issues, the NRC Office of Nuclear Reactor Regulation (NRR) implemented a Task Action Plan (TAP), and the Office of Nuclear Reactor Research (RES) initiated a complementary research program. The current focus of this program is on the qualification of low-voltage instrumentation and control cables. These cables were selected since they are not typically replaced on a routine basis, and their degradation could impact plant safety

  20. Developing e-banking services for rural India: making use of socio-technical prototypes

    DEFF Research Database (Denmark)

    Dittrich, Yvonne; Vaidyanathan, Lakshmi; Gonsalves, Timothy A

    2017-01-01

    an experience report based on systematic debriefing of involved project leaders and initiators, triangulated with additional documentation. The concept of Socio-Technical Prototype is developed and used to show how to mitigate the challenges of ICT based banking service provision for socially constrained...... communities. The concept of Socio-Technical Prototype extends the notion of prototypes, as it implies a full functioning implementation of the service including all relevant stakeholders. In order to not only prototype end-user functionality but also the interaction of the solution with the specific social......, technical and physical environment. The implications for software engineering in the development of such large-scale prototypes and pilots are outlined....

  1. Health physics documentation

    International Nuclear Information System (INIS)

    Stablein, G.

    1980-01-01

    When dealing with radioactive material the health physicist receives innumerable papers and documents within the fields of researching, prosecuting, organizing and justifying radiation protection. Some of these papers are requested by the health physicist and some are required by law. The scope, quantity and deposit periods of the health physics documentation at the Karlsruhe Nuclear Research Center are presented and rationalizing methods discussed. The aim of this documentation should be the application of physics to accident prevention, i.e. documentation should protect those concerned and not the health physicist. (H.K.)

  2. CAED Document Repository

    Data.gov (United States)

    U.S. Environmental Protection Agency — Compliance Assurance and Enforcement Division Document Repository (CAEDDOCRESP) provides internal and external access of Inspection Records, Enforcement Actions, and...

  3. CFO Payment Document Management

    Data.gov (United States)

    US Agency for International Development — Paperless management will enable the CFO to create, store, and access various financial documents electronically. This capability will reduce time looking for...

  4. Prototype effect and the persuasiveness of generalizations

    OpenAIRE

    Dahlman, Christian; Sarwar, Farhan; Bååth, Rasmus; Wahlberg, Lena; Sikström, Sverker

    2015-01-01

    An argument that makes use of a generalization activates the prototype for the category used in the generalization. We conducted two experiments that investigated how the activation of the prototype affects the persuasiveness of the argument. The results of the experiments suggest that the features of the prototype overshadow and partly overwrite the actual facts of the case. The case is, to some extent, judged as if it had the features of the prototype instead of the features it actually ...

  5. 49 CFR 391.11 - General qualifications of drivers.

    Science.gov (United States)

    2010-10-01

    ... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Qualification and... motor vehicle unless he/she is qualified to drive a commercial motor vehicle. Except as provided in...

  6. Qualification Paths of Adult Educators in Sweden and Denmark

    Science.gov (United States)

    Andersson, Per; Kopsen, Susanne; Larson, Anne; Milana, Marcella

    2013-01-01

    The qualification of adult educators is a central aspect of the quality of adult education. However, within current policy discourses and adult education research on the professional development of prospective adult educators, little attention is paid to teacher qualification when compared to other fields of education and training. In this study,…

  7. 42 CFR 21.47 - Examination; anticipation of meeting qualifications.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Examination; anticipation of meeting qualifications. 21.47 Section 21.47 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES PERSONNEL COMMISSIONED OFFICERS Appointment § 21.47 Examination; anticipation of meeting qualifications. A...

  8. 14 CFR 135.247 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Flight Crewmember Requirements § 135.247 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as pilot in command of an aircraft carrying...

  9. 14 CFR 121.437 - Pilot qualification: Certificates required.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Certificates required... Pilot qualification: Certificates required. (a) No pilot may act as pilot in command of an aircraft (or... pilots) unless he holds an airline transport pilot certificate and an appropriate type rating for that...

  10. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Recent experience. 121... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person serve as a required pilot flight crewmember, unless within the preceding 90 days, that person has made...

  11. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as a required pilot flight crewmember unless within the preceding 90...

  12. 12 CFR 563c.3 - Qualification of public accountant.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Qualification of public accountant. 563c.3... REQUIREMENTS Form and Content of Financial Statements § 563c.3 Qualification of public accountant. (See also 17 CFR 210.2-01.) The term “qualified public accountant” means a certified public accountant or licensed...

  13. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting engineer within the provisions of subpart O of this part, for the purpose of operating a steam-driven hoist...

  14. Qualifications of Subject Teachers in Special Education Schools

    Science.gov (United States)

    Rasmussen, Meryem Uçar; Kis, Arzu

    2018-01-01

    Teacher qualifications are essential to be able to teach children with special needs efficiently. Therefore the aim of this study is to determine the qualifications of subject teachers in special education schools in Turkey. In the study 20 subject teachers within the field of music, art and sports who worked in special education schools in Turkey…

  15. Selection, qualification and training of personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This standard provides criteria for the selection, qualification and training of personnel for stationary nuclear power plants. Qualifications, responsibilities, and training of personnel in operating and support organizations appropriate for the safe and efficient operation of nuclear power plants are addressed

  16. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  17. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  18. 49 CFR 214.343 - Training and qualification, general.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification, general. 214.343... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.343 Training and qualification, general. (a) No employer shall assign an employee to perform the duties of a...

  19. Qualifications Frameworks and Their Conflicting Social Imaginaries of Globalisation

    Science.gov (United States)

    Louise Sarauw, Laura

    2012-01-01

    Critics often see the European Bologna Process as a univocal standardisation of higher education. By exploring how different qualifications frameworks project different social imaginaries of globalisation, this article takes a different stance. The overarching qualifications framework of the Bologna Process rests on a socially constituted and…

  20. 32 CFR 935.139 - Motor vehicle operator qualifications.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor vehicle operator qualifications. 935.139... AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.139 Motor vehicle operator qualifications. (a) No person may operate a privately owned motor vehicle on Wake Island unless he has an island...

  1. 29 CFR 1926.1076 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  2. 29 CFR 1910.410 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Qualifications of dive team. 1910.410 Section 1910.410... Requirements § 1910.410 Qualifications of dive team. (a) General. (1) Each dive team member shall have the experience or training necessary to perform assigned tasks in a safe and healthful manner. (2) Each dive team...

  3. 12 CFR 231.3 - Qualification as a financial institution.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Qualification as a financial institution. 231.3... RESERVE SYSTEM NETTING ELIGIBILITY FOR FINANCIAL INSTITUTION (REGULATION EE) § 231.3 Qualification as a financial institution. (a) A person qualifies as a financial institution for purposes of sections 401-407 of...

  4. Qualification Users' Perceptions and Experiences of Assessment Reliability

    Science.gov (United States)

    Chamberlain, Suzanne

    2013-01-01

    This paper presents the findings of a study designed to explore qualification users' perceptions and experiences of reliability in the context of national assessment outcomes in England. The study consisted of 17 focus groups conducted across six sectors of qualification users: students, teachers, trainee teachers, job-seekers, employers and…

  5. 14 CFR 121.909 - Approval of Advanced Qualification Program.

    Science.gov (United States)

    2010-01-01

    ... criteria. Each AQP must have separate curriculums for indoctrination, qualification, and continuing... the training and evaluation of CRM and technical skills and knowledge. An application for approval of... must meet all the requirements of this subpart. (2) Each indoctrination, qualification, and continuing...

  6. Qualification, commissioning and in situ monitoring of high heat flux plasma facing components

    Energy Technology Data Exchange (ETDEWEB)

    Escourbiac, F. [Association Euratom-CEA, CEA/DSM/DRFC, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France)], E-mail: frederic.escourbiac@cea.fr; Durocher, A.; Grosman, A.; Cismondi, F.; Courtois, X.; Farjon, J.L.; Schlosser, J. [Association Euratom-CEA, CEA/DSM/DRFC, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France); Merola, M.; Tivey, R. [ITER Team, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France)

    2007-10-15

    Up-to-date development of actively cooled high heat flux (HHF) plasma facing components (PFC) prototypes only allows reduced margins with regards to the ITER thermal requirements. Additionally, perfect quality cannot be ensured along series manufacturing: the presence of flaws which impair the heat transfer capability of the component, in particular at the interface armour/heat sink appears to be statistically unavoidable. In order to ensure a successful series production, a qualification methodology of actively cooled high heat flux plasma facing components is proposed. Secondly, advanced non-destructive techniques developed for HHF PFC commissioning are detailed with definition of acceptance criteria. Finally, innovative diagnostics for in situ monitoring during plasma operations or tokamak shutdowns are investigated in order to prevent immediate damage (safety monitoring); or evaluate component degradation (health monitoring). This work takes into account the relevance to Tore Supra, and is applied to W7X and ITER Divertor HHF PFC.

  7. Safety analyses for an in-pile SCWR fuel qualification test loop

    Energy Technology Data Exchange (ETDEWEB)

    Schulenberg, T.; Raque, M. [Karlsruhe Inst. of Tech., Karlsruhe (Germany)

    2014-07-01

    As a nuclear facility cooled with supercritical water has never been built nor operated in the past, the planned SCWR fuel qualification test will give the first experience with supercritical water-cooled nuclear systems in general. With a fuel inventory of almost 1 kg of UO{sub 2} with almost 20% enrichment, the supercritical pressure test section inside a low pressure, pool type research reactor needs to be cooled properly even in case of a number of postulated design basis accidents. Depressurization systems and emergency cooling systems will need to be designed with similar reliability as for a prototype reactor to ensure the integrity of barriers retaining the radioactive material. The paper reports about the safety concept and summarizes the safety analyses which have been performed in this context. (author)

  8. Qualification, commissioning and in situ monitoring of high heat flux plasma facing components

    International Nuclear Information System (INIS)

    Escourbiac, F.; Durocher, A.; Grosman, A.; Cismondi, F.; Courtois, X.; Farjon, J.L.; Schlosser, J.; Merola, M.; Tivey, R.

    2007-01-01

    Up-to-date development of actively cooled high heat flux (HHF) plasma facing components (PFC) prototypes only allows reduced margins with regards to the ITER thermal requirements. Additionally, perfect quality cannot be ensured along series manufacturing: the presence of flaws which impair the heat transfer capability of the component, in particular at the interface armour/heat sink appears to be statistically unavoidable. In order to ensure a successful series production, a qualification methodology of actively cooled high heat flux plasma facing components is proposed. Secondly, advanced non-destructive techniques developed for HHF PFC commissioning are detailed with definition of acceptance criteria. Finally, innovative diagnostics for in situ monitoring during plasma operations or tokamak shutdowns are investigated in order to prevent immediate damage (safety monitoring); or evaluate component degradation (health monitoring). This work takes into account the relevance to Tore Supra, and is applied to W7X and ITER Divertor HHF PFC

  9. Implicit face prototype learning from geometric information.

    Science.gov (United States)

    Or, Charles C-F; Wilson, Hugh R

    2013-04-19

    There is evidence that humans implicitly learn an average or prototype of previously studied faces, as the unseen face prototype is falsely recognized as having been learned (Solso & McCarthy, 1981). Here we investigated the extent and nature of face prototype formation where observers' memory was tested after they studied synthetic faces defined purely in geometric terms in a multidimensional face space. We found a strong prototype effect: The basic results showed that the unseen prototype averaged from the studied faces was falsely identified as learned at a rate of 86.3%, whereas individual studied faces were identified correctly 66.3% of the time and the distractors were incorrectly identified as having been learned only 32.4% of the time. This prototype learning lasted at least 1 week. Face prototype learning occurred even when the studied faces were further from the unseen prototype than the median variation in the population. Prototype memory formation was evident in addition to memory formation of studied face exemplars as demonstrated in our models. Additional studies showed that the prototype effect can be generalized across viewpoints, and head shape and internal features separately contribute to prototype formation. Thus, implicit face prototype extraction in a multidimensional space is a very general aspect of geometric face learning. Copyright © 2013 Elsevier Ltd. All rights reserved.

  10. The Scintillator Tile Hadronic Calorimeter Prototype

    International Nuclear Information System (INIS)

    Rusinov, V.

    2006-01-01

    A high granularity scintillator hadronic calorimeter prototype is described. The calorimeter is based on a novel photodetector - Silicon Photo-Multiplier (SiPM). The main parameters of SiPM are discussed as well as readout cell construction and optimization. The experience with a small prototype production and testing is described. A new 8 k channel prototype is being manufactured now

  11. Rapid Prototyping: An Alternative Instructional Design Strategy.

    Science.gov (United States)

    Tripp, Steven D.; Bichelmeyer, Barbara

    1990-01-01

    Discusses the nature of instructional design and describes rapid prototyping as a feasible model for instructional system design (ISD). The use of prototyping in software engineering is described, similarities between software design and instructional design are discussed, and an example is given which uses rapid prototyping in designing a…

  12. Components Qualification for a Possible use in the Mu2e Calorimeter Waveform Digitizer

    Energy Technology Data Exchange (ETDEWEB)

    Di Falco, S. [INFN, Pisa; Donati, S. [INFN, Pisa; Morescalchi, L. [INFN, Pisa; Pedreschi, E. [INFN, Pisa; Pezzullo, G. [INFN, Pisa; Spinella, F. [INFN, Pisa

    2017-03-30

    The Mu2e experiment at Fermilab searches for the charged flavor violating conversion of a muon into an electron in the Coulomb field of a nucleus. The detector consists of a straw tube tracker and a CSI crystal electromagnetic calorimeter, both housed in a superconducting solenoid. Both the front-end and the digital electronics, located inside the cryostat, will be operated in vacuum under a 1 T magnetic field, having to sustain the high flux of neutrons and ionizing particles coming from the muons stopping target. These harsh experimental conditions make the design of the calorimeter waveform digitizer quite challenging. All the selected commercial devices must be tested individually and qualified for radiation hardness and operation in high magnetic field. At the moment the expected particles flux and spectra at the digitizers location are not completely simulated and we are using initial rough estimates to select the components for the first prototype. We are gaining experience in the qualification procedures using the selected components but the choice will be frozen only when dose and neutron flux simulations will be completed. The experimental results of the first qualification campaign are presented.

  13. RMs1: qualification results of the rotary miniature Stirling cryocooler at Thales Cryogenics

    Science.gov (United States)

    Martin, Jean-Yves; Seguineau, Cédric; Van-Acker, Sébastien; Sacau, Mikel; Le Bordays, Julien; Etchanchu, Thierry; Vasse, Christophe; Abadie, Christian; Laplagne, Gilles; Benschop, Tonny

    2017-05-01

    The trend for miniaturized Integrated Dewar and Cooler Assemblies (IDCA) has been confirmed over the past few years with several mentions of a new generation of IR detector working at High Operating Temperature (HOT). This key technology enables the use of cryocooler with reduced needs of cryogenics power. As a consequence, miniaturized IDCA are the combination of a HOT IR detector coupled with a low-size, low-weight and low-power (SWaP) cryocooler. Thales Cryogenics has developed his own line of SWaP products. Qualification results on linear solution where shown last year. The current paper focuses on the latest results obtained on RMs1 prototypes, the new rotary SWaP cryocooler from Thales Cryogenics. Cryogenic performances and induced vibrations are presented. In a second part, progress is discussed on compactness and weight on one side, and on power consumption on the other side. It shows how the trade-off made between weight and power consumption could lead to an optimized solution at system level. At least, an update is made on the qualification status.

  14. JT-60SA TF magnet industrial manufacturing preparation and qualifications

    International Nuclear Information System (INIS)

    Decool, P.; Cloez, H.; Gros, G.; Marechal, J.L.; Torre, A.; Verger, J.M.; Nusbaum, M.; Billotte, G.; Crepel, B.; Bourquard, A.; Davis, S.; Phillips, G.

    2014-01-01

    The general design of the JT-60SA toroidal field system was defined in agreement with all the participants in the project (CEA, ENEA, F4E), the detailed design was issued by the Voluntary Contributors. For the French part including the procurement of 9 of the 18 TF winding packs and their integration in the casings, an industrial contract was signed mid-2011 with Alstom (France). After agreement on manufacturing drawings and QA documentation, the manufacturing process was defined giving the guidelines for the workshop organization and the definition of the required tooling. The critical manufacturing points were identified in the process and, regarding technical requirements, have led to the definition of a set of qualification mockups. They are related to helium inlets, conductor winding and insulation, local conductor bending, electrical joint and terminal areas for the winding pack (WP), as well as winding embedding, case welding, and impregnations for WP integration in the casing. The fabrication processes have been improved and shall be qualified thanks to the manufacture and testing of 12 corresponding mockups. The successful achievement of several key mock-ups gives confidence in the feasibility of the manufacture, and their completion will give the green light to the industrial coils manufacture. (authors)

  15. IEEE recommended practices for seismic qualification of Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The IEEE has developed this document to provide direction for developing programs to seismically qualify Class 1E equipment for nuclear power generating stations. It supplements IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for equipment qualification. The Class 1E equipment to be qualified by produres or standards established by this document are of many forms, characteristics, and materials; therefore, the document presents many acceptable methods with the intent of permitting the user to make a judicious selection from among the various options. In making such a selection, the user should choose those that best meet a particular equipment's requirements. Further, in using this document as a specification for the purchase of equipment, the many options should also be recognized and the document invoked accordingly. It is recommended that the need for specific standards for the seismic qualifiction of particular kinds of equipment be evaluated by those responsible for such documents and that consideration be given to the application of particular methods from these documents which are most suitable

  16. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  17. Qualification criteria for persons responsible for radiation protection

    International Nuclear Information System (INIS)

    Wehner, G

    1980-01-01

    A survey of the qualification criteria included in the German atomic law (Atomic Energy Act, Radiological Protection Ordinance and X-ray Protection Ordinance) for persons responsible for radiation protection is given. Especially the various activities for which a health physics officer is required, the range of qualification in each case and the way the qualification has to be proved, are pointed out. Also the different guides that are issued to complete the legal requirements are mentioned. The definitions of the term qualification for health physics given in the different guides are cited and it is shown, that the qualification of a healt physics officer has to be based on the three criteria (I) vocational training. (II) professional experience and (III) the necessary knowledge in radiation protection. (orig./HP) [de

  18. Developing competence based qualification system in the nuclear energy sector

    International Nuclear Information System (INIS)

    Ceclan, Mihail

    2016-01-01

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  19. Developing competence based qualification system in the nuclear energy sector

    Energy Technology Data Exchange (ETDEWEB)

    Ceclan, Mihail [European Commission, Petten (Netherlands). Inst. for Energy and Transport

    2016-04-15

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  20. Data Qualification Report: Calculated Porosity and Porosity-Derived Values for Lithostratigraphic Units for use on the Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    P. Sanchez

    2001-05-30

    The qualification is being completed in accordance with the Data Qualification Plan DQP-NBS-GS-000006, Rev. 00 (CRWMS M&O 2001). The purpose of this data qualification activity is to evaluate for qualification the unqualified developed input and porosity output included in Data Tracking Number (DTN) M09910POROCALC.000. The main output of the analyses documented in DTN M09910POROCALC.000 is the calculated total porosity and effective porosity for 40 Yucca Mountain Project boreholes. The porosity data are used as input to Analysis Model Report (AMR) 10040, ''Rock Properties Model'' (MDL-NBS-GS-000004, Rev. 00), Interim Change Notice [ICN] 02 (CRWMS M&O 2000b). The output from the rock properties model is used as input to numerical physical-process modeling within the context of a relationship developed in the AMR between hydraulic conductivity, bound water and zeolitic zones for use in the unsaturated zone model. In accordance with procedure AP-3.15Q, the porosity output is not used in the direct calculation of Principal Factors for post-closure safety or disruptive events. The original source for DTN M09910POROCALC.000 is a Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M&O) report, ''Combined Porosity from Geophysical Logs'' (CRWMS M&O 1999a and hereafter referred to as Rael 1999). That report recalculated porosity results for both the historical boreholes covered in Nelson (1996), and the modern boreholes reported in CRWMS M&O (1996a,b). The porosity computations in Rael (1999) are based on density-porosity mathematical relationships requiring various input parameters, including bulk density, matrix density and air and/or fluid density and volumetric water content. The main output is computed total porosity and effective porosity reported on a foot-by-foot basis for each borehole, although volumetric water content is derived from neutron data as an interim output. This qualification

  1. Data Qualification Report: Calculated Porosity and Porosity-Derived Values for Lithostratigraphic Units for use on the Yucca Mountain Project

    International Nuclear Information System (INIS)

    P. Sanchez

    2001-01-01

    The qualification is being completed in accordance with the Data Qualification Plan DQP-NBS-GS-000006, Rev. 00 (CRWMS M and O 2001). The purpose of this data qualification activity is to evaluate for qualification the unqualified developed input and porosity output included in Data Tracking Number (DTN) M09910POROCALC.000. The main output of the analyses documented in DTN M09910POROCALC.000 is the calculated total porosity and effective porosity for 40 Yucca Mountain Project boreholes. The porosity data are used as input to Analysis Model Report (AMR) 10040, ''Rock Properties Model'' (MDL-NBS-GS-000004, Rev. 00), Interim Change Notice [ICN] 02 (CRWMS M and O 2000b). The output from the rock properties model is used as input to numerical physical-process modeling within the context of a relationship developed in the AMR between hydraulic conductivity, bound water and zeolitic zones for use in the unsaturated zone model. In accordance with procedure AP-3.15Q, the porosity output is not used in the direct calculation of Principal Factors for post-closure safety or disruptive events. The original source for DTN M09910POROCALC.000 is a Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) report, ''Combined Porosity from Geophysical Logs'' (CRWMS M and O 1999a and hereafter referred to as Rael 1999). That report recalculated porosity results for both the historical boreholes covered in Nelson (1996), and the modern boreholes reported in CRWMS M and O (1996a,b). The porosity computations in Rael (1999) are based on density-porosity mathematical relationships requiring various input parameters, including bulk density, matrix density and air and/or fluid density and volumetric water content. The main output is computed total porosity and effective porosity reported on a foot-by-foot basis for each borehole, although volumetric water content is derived from neutron data as an interim output. This qualification report uses

  2. Qualification of the Improved rotating probe process for steam generator tubes inspection

    International Nuclear Information System (INIS)

    Caston, D.

    2002-01-01

    In 1997, EDF called for bids to Eddy Current (EC) probes manufacturers to supply rotating probes in order to improve the inspection of the Roll Transition Zone of Steam Generator tubes. Several probes met EDF requirements, and after full assessment, EDF chose one between several EC rotating probe prototypes. For the state of its technical study, EDF chose CEGELEC NDTs services among French ISI SG NDT providers, to inspect a limited number of tubes on two French NPP in 2000 with this prototype. Improved Rotating Probe process technical requirements were provided by EDF with the SG contract specifications in June 2000. They dictate technique performances level and acquisition rate of this new process using two techniques at the same time: - STL classic technique applied for detection and sizing of axial cracks; - STT technique, applied for detection and Sizing of circumferential cracks and wear. It has to be used, instead of classic STL process, without increasing inspection duration and SG occupancy. In competition for the qualification, CEGELEC NDT decided to design a new probe with its providers, including the two EC sensors and meeting EDF's requirements. Two another new equipment, designed in CEGELEC NDT laboratories, have been integrated into Improved Rotating Probe Process: - 'STL Lift', new rotating probe push-puller for Roll Transition Zone inspection; - 'ANASTL', on-line STL and STT data quality check, on-line data processing and analysis software. Without talking about performances of the technique and results obtained on site, this paper presents the new equipment, the different phases of the qualification conducted according to RSE-M rules, the first field experiences in August 2001 and the feedback experience of following site inspections. (author)

  3. Advances and highlights of the CNEA qualification program as high density fuel manufacturer for research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Adelfang, P.; Alvarez, L.; Boero, N.; Calabrese, R.; Echenique, P.; Markiewicz, M.; Pasqualini, E.; Ruggirello, G.; Taboada, H. [Unidad de Actividad Combustibles Nucleares Comision Nacional de Energia Atomica (CNE4), Avda. del Libertador, 8250 C1429BNO Buenos Aires (Argentina)

    2002-07-01

    One of the main objectives of CNEA regarding the fuel for research reactors is the development and qualification of the manufacturing of LEU high-density fuels. The qualification programs for both types of fuels, Silicide fuel and U- x Mo fuel, are similar. They include the following activities: development and set up of the fissile compound manufacturing technology, set up of fuel plate manufacturing, fabrication and irradiation of mini plates and plates, design and fabrication of fuel assembly prototypes for irradiation, post-irradiation examination and feedback for manufacturing improvements. This paper describes the different activities performed within each program during the last year and the main advances and achievements of the programs within this period. The main achievements may be summarized in the following activities: Continuation of the irradiation of the first silicide fuel element in the R A3. Completion of the manufacturing of the second silicide fuel element, licensing and beginning of its irradiation in the R A3. Development of the HMD Process to manufacture U-Mo powder (pUMA project). Set up of fuel plates manufacturing at industrial level using U-Mo powder. Preliminary studies and the design for the irradiation of mini plates, plates and full scale fuel elements with U-Mo and 7 g U/cm{sup 3}. PIE destructive studies for the P-04 silicide fuel prototype (accurate burnup determination through chemical analysis, metallography and SEM of samples from the irradiated fuel plates). Improvement and development of new characterization techniques for high density fuel plates quality control including US testing and densitometric analysis of X-ray examinations. The results obtained in this period are encouraging and also allow to foresee a wider participation of CNEA in the international effort to qualify U-Mo as a new material for the manufacturing of research reactor fuels. (author)

  4. Advances and highlights of the CNEA qualification program as high density fuel manufacturer for research reactors

    International Nuclear Information System (INIS)

    Adelfang, P.; Alvarez, L.; Boero, N.; Calabrese, R.; Echenique, P.; Markiewicz, M.; Pasqualini, E.; Ruggirello, G.; Taboada, H.

    2002-01-01

    One of the main objectives of CNEA regarding the fuel for research reactors is the development and qualification of the manufacturing of LEU high-density fuels. The qualification programs for both types of fuels, Silicide fuel and U- x Mo fuel, are similar. They include the following activities: development and set up of the fissile compound manufacturing technology, set up of fuel plate manufacturing, fabrication and irradiation of mini plates and plates, design and fabrication of fuel assembly prototypes for irradiation, post-irradiation examination and feedback for manufacturing improvements. This paper describes the different activities performed within each program during the last year and the main advances and achievements of the programs within this period. The main achievements may be summarized in the following activities: Continuation of the irradiation of the first silicide fuel element in the R A3. Completion of the manufacturing of the second silicide fuel element, licensing and beginning of its irradiation in the R A3. Development of the HMD Process to manufacture U-Mo powder (pUMA project). Set up of fuel plates manufacturing at industrial level using U-Mo powder. Preliminary studies and the design for the irradiation of mini plates, plates and full scale fuel elements with U-Mo and 7 g U/cm 3 . PIE destructive studies for the P-04 silicide fuel prototype (accurate burnup determination through chemical analysis, metallography and SEM of samples from the irradiated fuel plates). Improvement and development of new characterization techniques for high density fuel plates quality control including US testing and densitometric analysis of X-ray examinations. The results obtained in this period are encouraging and also allow to foresee a wider participation of CNEA in the international effort to qualify U-Mo as a new material for the manufacturing of research reactor fuels. (author)

  5. Operations management system advanced automation: Fault detection isolation and recovery prototyping

    Science.gov (United States)

    Hanson, Matt

    1990-01-01

    The purpose of this project is to address the global fault detection, isolation and recovery (FDIR) requirements for Operation's Management System (OMS) automation within the Space Station Freedom program. This shall be accomplished by developing a selected FDIR prototype for the Space Station Freedom distributed processing systems. The prototype shall be based on advanced automation methodologies in addition to traditional software methods to meet the requirements for automation. A secondary objective is to expand the scope of the prototyping to encompass multiple aspects of station-wide fault management (SWFM) as discussed in OMS requirements documentation.

  6. Attribute measurement systems prototypes and equipment in the United States

    International Nuclear Information System (INIS)

    Langner, D.C.; Landry, R.P.; Hsue, S.-T.; MacArthur, D.W.; Mayo, D.R.; Smith, M.K.; Nicholas, N.J.; Whiteson, R.

    2001-01-01

    Since the fall of 1997, the United States has been developing prototypical attribute verification technology for potential use by the International Atomic Energy Agency (IAEA) under the Trilateral Initiative. The first attribute measurement equipment demonstration took place in December 1997 at the Lawrence Livermore National Laboratory. This demonstration led to a series of joint Russian Federatioin/US/IAEA technical discussions that focused on attribute measurement technology that could be applied to plutonium bearing items having classified characteristics. A first prototype attribute verification system with an information barrier was demonstrated at a Trilateral Technical Workshop in June 1999 at Los Alamos. This prototype nourished further fruitful discussions between the three parties that has in turn led to the documents discussed in a previous paper. Prototype development has continued in the US, under other initiatives, using an integrated approach that includes the Trilatleral Initiative. Specifically for the Trilateral Initiative, US development has turned to some peripheral equipment that would support verifications by the IAEA. This equipment includes an authentication tool for measurement systems with information barriers and in situ probes that would facilitate inspections by reducing the need to move material out of storage locations for reverification. In this paper, we will first summarize the development of attribute verification measurement system technology in the US and then report on the status of the development of other equipment to support the Trilateral Initiative.

  7. Skill qualifications in pediatric minimally invasive surgery.

    Science.gov (United States)

    Iwanaka, Tadashi; Morikawa, Yasuhide; Yamataka, Atsuyuki; Nio, Masaki; Segawa, Osamu; Kawashima, Hiroshi; Sato, Masahito; Terakura, Hirotsugu; Take, Hiroshi; Hirose, Ryuichiro; Yagi, Makoto

    2011-07-01

    In 2006, The Japanese Society of Pediatric Endoscopic Surgeons devised a plan to develop a pediatric endoscopic surgical skill qualification (ESSQ) system. This system is controlled by The Japan Society for Endoscopic Surgery. The standard requirement for skills qualification is the ability of each applicant to complete common types of laparoscopic surgery. The main goal of the system is to decrease complications of laparoscopic surgery by evaluating the surgical skills of each applicant and subsequently certify surgeons with adequate skills to perform laparoscopic operations safely. A committee of pediatric ESSQ created a checklist to assess the applicant's laparoscopic surgical skills. Skills are assessed in a double-blinded fashion by evaluating an unedited video recording of a fundoplication for pediatric gastroesophageal reflux disease. The initial pediatric ESSQ system was started in 2008. In 2008 and 2009, respectively, 9 out of 17 (53%) and 6 out of 12 (50%) applicants were certified as expert pediatric laparoscopic surgeons. Our ultimate goal is to provide safe and appropriate pediatric minimally invasive procedures and to avoid severe complications. To prove the predictive validity of this system, a survey of the outcomes of operations performed by certified pediatric surgeons is required.

  8. MTR fuel plate qualification in OSIRIS reactor

    International Nuclear Information System (INIS)

    Sacristan, P.; Boulcourt, P.; Naury, S.; Marchard, L.; Carcreff, H.; Noirot, J.

    2005-01-01

    Qualification of new MTR fuel needs the irradiation in research reactors under representative neutronic, heat flux and thermohydraulic conditions. The experiments are performed in France in the OSIRIS reactor by irradiating MTR full size fuel plates in the IRIS device located in the reactor core. The fuel plates are easily removed from the device during the shutdown of the reactor for performing thickness measurements along the plates by means of a swelling measurement device. Beside the calculation capabilities, the experimental platform includes: the ISIS neutron mock-up for the measurement of neutron flux distribution along the plates; the γ spectrometry for the purpose of measuring the activities of the radionuclides representative of the power and the burnup and to compare with the neutronic calculation. Owing to the experience feedback, a good agreement is observed between calculation and measurement; destructive post irradiation examinations in the LECA facility (Cadarache). New irradiations with the IRIS device and at higher heat flux are under preparation for qualification of MTR fuels. (author)

  9. IDC System Specification Document.

    Energy Technology Data Exchange (ETDEWEB)

    Clifford, David J.

    2014-12-01

    This document contains the system specifications derived to satisfy the system requirements found in the IDC System Requirements Document for the IDC Reengineering Phase 2 project. Revisions Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Reengineering Project Team Initial delivery M. Harris

  10. INFCE plenary conference documents

    International Nuclear Information System (INIS)

    This document consists of the reports to the First INFCE Plenary Conference (November 1978) by the Working Groups a Plenary Conference of its actions and decisions, the Communique of the Final INFCE Plenary Conference (February 1980), and a list of all documents in the IAEA depository for INFCE

  11. Human Document Project

    NARCIS (Netherlands)

    de Vries, Jeroen; Abelmann, Leon; Manz, A; Elwenspoek, Michael Curt

    2012-01-01

    “The Human Document Project‿ is a project which tries to answer all of the questions related to preserving information about the human race for tens of generations of humans to come or maybe even for a future intelligence which can emerge in the coming thousands of years. This document mainly

  12. Reactive documentation system

    Science.gov (United States)

    Boehnlein, Thomas R.; Kramb, Victoria

    2018-04-01

    Proper formal documentation of computer acquired NDE experimental data generated during research is critical to the longevity and usefulness of the data. Without documentation describing how and why the data was acquired, NDE research teams lose capability such as their ability to generate new information from previously collected data or provide adequate information so that their work can be replicated by others seeking to validate their research. Despite the critical nature of this issue, NDE data is still being generated in research labs without appropriate documentation. By generating documentation in series with data, equal priority is given to both activities during the research process. One way to achieve this is to use a reactive documentation system (RDS). RDS prompts an operator to document the data as it is generated rather than relying on the operator to decide when and what to document. This paper discusses how such a system can be implemented in a dynamic environment made up of in-house and third party NDE data acquisition systems without creating additional burden on the operator. The reactive documentation approach presented here is agnostic enough that the principles can be applied to any operator controlled, computer based, data acquisition system.

  13. BWR reactor water cleanup system flexible wedge gate isolation valve qualification and high energy flow interruption test

    International Nuclear Information System (INIS)

    DeWall, K.G.; Steele, R. Jr.

    1989-10-01

    This report presents the results of research performed to develop technical insights for the NRC effort regarding Generic Issue 87, ''Failure of HPCI Steam Line Without Isolation.'' Volume III of this report contains the data and findings from the original research performed to assess the qualification of the valves and reported in EGG-SSRE-7387, ''Qualification of Valve Assemblies in High Energy BWR Systems Penetrating Containment.'' We present the original work here to complete the documentation trail. The recommendations contained in Volume III of this report resulted in the test program described in Volume I and II. The research began with a survey to characterize the population of normally open containment isolation valves in those process lines that connect to the primary system and penetrate containment. The qualification methodology used by the various manufacturers identified in the survey is reviewed and deficiencies in that methodology are identified. Recommendations for expanding the qualification of valve assemblies for high energy pipe break conditions are presented. 11 refs., 1 fig., 2 tabs

  14. Automating testbed documentation and database access using World Wide Web (WWW) tools

    Science.gov (United States)

    Ames, Charles; Auernheimer, Brent; Lee, Young H.

    1994-01-01

    A method for providing uniform transparent access to disparate distributed information systems was demonstrated. A prototype testing interface was developed to access documentation and information using publicly available hypermedia tools. The prototype gives testers a uniform, platform-independent user interface to on-line documentation, user manuals, and mission-specific test and operations data. Mosaic was the common user interface, and HTML (Hypertext Markup Language) provided hypertext capability.

  15. Documentation: Records and Reports.

    Science.gov (United States)

    Akers, Michael J

    2017-01-01

    This article deals with documentation to include the beginning of documentation, the requirements of Good Manufacturing Practice reports and records, and the steps that can be taken to minimize Good Manufacturing Practice documentation problems. It is important to remember that documentation for 503a compounding involves the Formulation Record, Compounding Record, Standard Operating Procedures, Safety Data Sheets, etc. For 503b outsourcing facilities, compliance with Current Good Manufacturing Practices is required, so this article is applicable to them. For 503a pharmacies, one can see the development and modification of Good Manufacturing Practice and even observe changes as they are occurring in 503a documentation requirements and anticipate that changes will probably continue to occur. Copyright© by International Journal of Pharmaceutical Compounding, Inc.

  16. AGC-3 Experiment Irradiation Monitoring Data Qualification Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Laurence Hull

    2014-10-01

    The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. The third experiment, Advanced Graphite Creep 3 (AGC 3), began with Advanced Test Reactor (ATR) Cycle 152B on November 27, 2012, and ended with ATR Cycle 155B on April 23, 2014. This report documents qualification of AGC 3 experiment irradiation monitoring data for use by the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Program for research and development activities required to design and license the first VHTR nuclear plant. Qualified data meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements. Trend data may not meet the requirements, but may still provide some useable information. All thermocouples (TCs) functioned throughout the AGC 3 experiment. There was one interval between December 18, 2012, and December 20, 2012, where 10 NULL values were reported for various TCs. These NULL values were deleted from the Nuclear Data Management and Analysis System database. All temperature data are Qualified for use by the VHTR TDO Program. Argon, helium, and total gas flow data were within expected ranges and are Qualified for use by the VHTR TDO Program. Total gas flow was approximately 50 sccm through the AGC 3 experiment capsule. Helium gas flow was briefly increased to 100 sccm during ATR shutdowns. At the start of the AGC 3 experiment, moisture in the outflow gas line was stuck at a constant value of 335.6174 ppmv for the first cycle (Cycle 152B). When the AGC 3 experiment capsule was reinstalled in ATR for Cycle 154B, a new moisture filter was installed. Moisture data from Cycle 152B are Failed. All moisture data from the final three cycles (Cycles 154B, 155A, and 155B) are Qualified for use by the VHTR TDO Program.

  17. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  18. Fabrication of small mock-ups reflecting the design features of the ITER semi-prototype

    International Nuclear Information System (INIS)

    Jung, Yang-Il; Choi, Byoung-Kwon; Park, Jeong-Yong; Kim, Suk-Kwon; Lee, Dong Won; Kim, Byoung Yoon

    2012-01-01

    The ITER semi-prototype was designed to qualify the manufacturing technology for the ITER blanket first wall. However, its fabrication is expected to face great difficulty due to a design complexity. Even though joining technology for different materials such as beryllium, CuCrZr, and stainless steel (SS) was developed during the first stage of qualification, the joining is still a key issue for the fabrication of the semi-prototype. In this study, small mock-ups (SMU) were fabricated to realize and verify the manufacturing of the semi-prototype reflecting the described design features. The joining of multiple beryllium tiles on the angled CuCrZr surface was confirmed with SMU no. 1. Six beryllium tiles were joined using hot isostatic pressing (HIP), and slitting was then performed to form multiple tiles. In SMU no. 2, HIP was performed two times in order to facilitate the cooling channels at the CuCrZr/SS interface, and to join the beryllium tiles on CuCrZr/SS. The method used to form a pressure boundary for the complex cooling channels was also developed by fabricating the SMU no. 3. The SMUs confirmed the applicability of the HIP for the manufacturing of the semi-prototype.

  19. CNEA's quality system documentation

    International Nuclear Information System (INIS)

    Mazzini, M.M.; Garonis, O.H.

    1998-01-01

    Full text: To obtain an effective and coherent documentation system suitable for CNEA's Quality Management Program, we decided to organize the CNEA's quality documentation with : a- Level 1. Quality manual. b- Level 2. Procedures. c-Level 3. Qualities plans. d- Level 4: Instructions. e- Level 5. Records and other documents. The objective of this work is to present a standardization of the documentation of the CNEA's quality system of facilities, laboratories, services, and R and D activities. Considering the diversity of criteria and formats for elaboration the documentation by different departments, and since ultimately each of them generally includes the same quality management policy, we proposed the elaboration of a system in order to improve the documentation, avoiding unnecessary time wasting and costs. This will aloud each sector to focus on their specific documentation. The quality manuals of the atomic centers fulfill the rule 3.6.1 of the Nuclear Regulatory Authority, and the Safety Series 50-C/SG-Q of the International Atomic Energy Agency. They are designed by groups of competent and highly trained people of different departments. The normative procedures are elaborated with the same methodology as the quality manuals. The quality plans which describe the organizational structure of working group and the appropriate documentation, will asses the quality manuals of facilities, laboratories, services, and research and development activities of atomic centers. The responsibilities for approval of the normative documentation are assigned to the management in charge of the administration of economic and human resources in order to fulfill the institutional objectives. Another improvement aimed to eliminate unnecessary invaluable processes is the inclusion of all quality system's normative documentation in the CNEA intranet. (author) [es

  20. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    , managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led...