WorldWideScience

Sample records for prototypical qualifications documents

  1. ITER ECRH Upper Launcher: Test plan for qualification of the Diamond Torus Window Prototype III

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Gagliardi, Mario; Saibene, Gabriella [F4E, Antennas and Plasma Engineering, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany)

    2016-11-01

    Highlights: • A qualification program for the ITER diamond torus window is being developed. • The testing program for the qualification of the bare diamond disk is defined. • First qualification tests show a very good quality of the diamond disk prototypes. - Abstract: The diamond window is part of the electron cyclotron heating upper launcher system for ITER. Together with the isolation valve it constitutes the primary vacuum boundary and it also acts as first tritium barrier. Therefore the window is classified as Safety/Protection Important Component (SIC/PIC) with the nuclear safety function “confinement”. As the diamond window unit is not entirely covered by standard codes, an ad-hoc qualification program needs to be defined, including analysis, prototyping and testing. In the framework of a contract with F4E, the test program for a diamond window prototype is being developed with the aim to prove its operability for normal, accidental and incidental conditions as identified in the ITER load specifications. Tests range from dielectric loss measurements for the bare Chemical Vapour Deposition (CVD) diamond disk up to mechanical and vacuum tests for the complete window assembly. Finally mm-wave properties have to be characterized for the complete window. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete documentation of the process. This paper will present the development of the test plan for a window prototype, which is currently under manufacturing. First tests are directed to the characterization of the bare diamond disk with a focus on its dielectric properties.

  2. Mock-up qualification and prototype manufacture for ITER current leads

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Tingzhi, E-mail: tingszhou@ipp.ac.cn [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Lu, Kun; Ran, Qingxiang; Ding, Kaizhong; Feng, Hansheng; Wu, Huan; Liu, Chenglian; Song, Yuntao [Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Niu, Erwu [CNDA, Ministry of Science and Technology, Beijing (China); Bauer, Pierre; Devred, Arnaud [Magnet Division, ITER Organization, Cadarache (France)

    2015-10-15

    Highlights: • Vacuum brazing and electron beam welding qualification. • Machine and assembly strategy of fin type heat exchanger. • Soldering and joint resistance test of superconducting joint. • Pre-preg technology with vacuum bag on insulation. - Abstract: Three types of high temperature superconducting current leads (HTSCL) are designed to carry 68 kA, 55 kA or 10 kA to the ITER magnets. Before the supply of the HTS current lead series, the design and manufacturing process is qualified through mock-ups and prototypes. Seven mock-ups, representing the critical technologies of the current leads, were built and tested successfully in the Institute of Plasma Physics of the Chinese Academy of Sciences (ASIPP) in 2013. After the qualification some design features of the HTS leads were updated. This paper summarizes the qualification through mock-ups. In 2014 ASIPP started the manufacture of the prototypes. The preparation and manufacturing process are also described.

  3. ITER ECRH upper launcher torus diamond window – Prototyping, testing and qualification

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Ikeda, Ryosuke; Oda, Yasuhisa; Sakamoto, Keishi; Takahashi, Koji [Japan Atomic Energy Agency (JAEA), Plasma Heating Technology Group, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany)

    2015-10-15

    Highlights: • The diamond window prototype shows a very good transmission capability during high power RF experiments. • An ad-hoc qualification programme for the diamond torus window is being developed (contract between KIT and F4E). • The window design has been updated focused on its mechanical integrity and manufacturing aspects. - Abstract: The diamond window assembly is part of the ITER primary vacuum boundary and acts as the first tritium barrier and therefore it is classified as Safety/Protection Important Component (SIC/PIC). It consists of an ultra-low loss CVD diamond disk mounted in a system of metallic parts (copper/steel) and has to fulfil adequate transmission capability for high power mm-waves. High power RF experiments with a 1st window prototype had shown parasitic heating due to small gaps in the housing. After a design optimization directed to the mm-wave properties, the parasitic excitations of oscillations have been avoided in a 2nd prototype. This one is equipped with inserted waveguide structures, which cover gaps in the metallic structure of the window housing. From high power RF-measurements with a 0.86 MW/100 s pulse a loss tangent of 7.1 × 10{sup −6} could be estimated, corresponding to an increase of temperature of only 120 mK between inlet and outlet of the cooling system. The diamond window assemblies cannot be entirely covered by codes and standards. To comply with the French safety regulations, instead an ad-hoc qualification programme is required, being developed in the framework of a contract between KIT and F4E. A new prototype (3rd) will be built, which is designed to fit to the single HELICOFLEX sealed waveguide structures of the ex-vessel mm-system of the EC upper launcher (UL). The testing programme ranges from mechanical to vacuum tests up to dielectric loss measurements at low and high power. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete

  4. Large Bore Powder Gun Qualification (U)

    Energy Technology Data Exchange (ETDEWEB)

    Rabern, Donald A. [Los Alamos National Laboratory; Valdiviez, Robert [Los Alamos National Laboratory

    2012-04-02

    A Large Bore Powder Gun (LBPG) is being designed to enable experimentalists to characterize material behavior outside the capabilities of the NNSS JASPER and LANL TA-55 PF-4 guns. The combination of these three guns will create a capability to conduct impact experiments over a wide range of pressures and shock profiles. The Large Bore Powder Gun will be fielded at the Nevada National Security Site (NNSS) U1a Complex. The Complex is nearly 1000 ft below ground with dedicated drifts for testing, instrumentation, and post-shot entombment. To ensure the reliability, safety, and performance of the LBPG, a qualification plan has been established and documented here. Requirements for the LBPG have been established and documented in WE-14-TR-0065 U A, Large Bore Powder Gun Customer Requirements. The document includes the requirements for the physics experiments, the gun and confinement systems, and operations at NNSS. A detailed description of the requirements is established in that document and is referred to and quoted throughout this document. Two Gun and Confinement Systems will be fielded. The Prototype Gun will be used primarily to characterize the gun and confinement performance and be the primary platform for qualification actions. This gun will also be used to investigate and qualify target and diagnostic modifications through the life of the program (U1a.104 Drift). An identical gun, the Physics Gun, will be fielded for confirmatory and Pu experiments (U1a.102D Drift). Both guns will be qualified for operation. The Gun and Confinement System design will be qualified through analysis, inspection, and testing using the Prototype Gun for the majority of process. The Physics Gun will be qualified through inspection and a limited number of qualification tests to ensure performance and behavior equivalent to the Prototype gun. Figure 1.1 shows the partial configuration of U1a and the locations of the Prototype and Physics Gun/Confinement Systems.

  5. Synthesis of the IRSN report on its analysis of the safety guidance package (DOrS) of the ASTRID reactor project. Safety guidance document for the ASTRID prototype: Referral to the GPR. Opinion related to the safety guidance document of the ASTRID reactor project. ASTRID prototype: Safety guidance document for the ASTRID prototype

    International Nuclear Information System (INIS)

    Lachaume, Jean-Luc; Niel, Jean-Christophe

    2013-01-01

    A first document indicates the improvement guidelines for the ASTRID project based on the French experience in the field of sodium-cooled fast neutron reactors, addresses the safety objectives as they are presented for the ASTRID project, discusses how the project includes a regulation and design referential, and how it addresses various aspects of the design approach (ranking and analysis of operation situations, defence in depth, use of probabilistic studies, safety classification and qualification to accidental situations, taking internal and external aggressions into account and taking severe accidents into account at the design level). It comments the guidelines related to the first two barriers, to main safety functions (control of reactivity and of reactor cooling, containment of radioactive and toxic materials), to dismantling, to R and D for safety support. A second document is a letter sent by the ASN to the GPR (permanent group of experts in charge of nuclear reactors) about the safety guidance document for the ASTRID prototype. The third document is the answer and contains comments and recommendations by this group about the content of this document, and therefore addresses the same topics as the first document. The last document defines the framework of the approach to this document

  6. Qualification criteria to certify a package for air transport of plutonium

    International Nuclear Information System (INIS)

    1977-12-01

    The document describes qualification criteria developed by the U.S. Nuclear Regulatory Commission to certify a package for air transport of plutonium. Included in the document is a discussion of aircraft accident conditions and a summary of the technical basis for the qualification criteria. The criteria require prototype packages to be subjected to various individual and sequential tests that simulate the conditions produced in severe aircraft accidents. Specific post-test acceptance standards are prescribed for each of the three safety functions of a package. The qualification criteria also prescribe certain operational controls to be exercised during transport

  7. Prototype Hanford Surface Barrier: Design basis document

    International Nuclear Information System (INIS)

    Myers, D.R.; Duranceau, D.A.

    1994-11-01

    The Hanford Site Surface Barrier Development Program (BDP) was organized in 1985 to develop the technology needed to provide a long-term surface barrier capability for the Hanford Site and other arid sites. This document provides the basis of the prototype barrier. Engineers and scientists have momentarily frozen evolving barrier designs and incorporated the latest findings from BDP tasks. The design and construction of the prototype barrier has required that all of the various components of the barrier be brought together into an integrated system. This integration is particularly important because some of the components of the protective barreir have been developed independently of other barreir components. This document serves as the baseline by which future modifications or other barrier designs can be compared. Also, this document contains the minutes of meeting convened during the definitive design process in which critical decisions affecting the prototype barrier's design were made and the construction drawings

  8. System design document for the INFLO prototype.

    Science.gov (United States)

    2014-03-01

    This report documents the high level System Design Document (SDD) for the prototype development and : demonstration of the Intelligent Network Flow Optimization (INFLO) application bundle, with a focus on the Speed : Harmonization (SPD-HARM) and Queu...

  9. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    International Nuclear Information System (INIS)

    Banetta, S.; Bellin, B.; Lorenzetto, P.; Zacchia, F.; Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P.; Mitteau, R.; Eaton, R.; Raffray, R.; Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T.

    2015-01-01

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m"2). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m"2 show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m"2 is described in detail.

  10. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    Energy Technology Data Exchange (ETDEWEB)

    Banetta, S., E-mail: stefano.banetta@f4e.europa.eu [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Bellin, B.; Lorenzetto, P.; Zacchia, F. [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P. [AREVA NP PTCMI-F, Centre Technique, Fusion, 71200 Le Creusot (France); Mitteau, R.; Eaton, R.; Raffray, R. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T. [Forschungszentrum Jülich, Institute of Energy and Climate Research, Jülich (Germany)

    2015-10-15

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m{sup 2}). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m{sup 2} show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m{sup 2} is described in detail.

  11. Supplement to nuclear EQ sourcebook: A compilation of documents for nuclear equipment qualification

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    In the nuclear power industry, environmental and seismic qualification of safety-related electrical and instrumentation equipment is collectively known as Equipment Qualification (EQ). Related technology, as well as regulatory requirements, have evolved rapidly during the last 15 years. For environmental qualification, what began in 1971 with one trial-use guide (IEEE Std 323-1971), now stands as a full complement of Nuclear Regulatory Commission (NRC) rules, guides, and industry standards. As the original 1992 version of the Nuclear EQ Sourcebook was compiled to serve the user-community need for a complete and exhaustive single source of nuclear EQ documentation, this Supplement is published to provide the user community with nuclear EQ documentation revisions and updates that have been published since the publication of the original volume in May of 1992. The first volume of this publication included documents issued before December, 1991. That first volume was well received and also prompted positive response from industry on its usefulness and on recommendations to improve the completeness and enhance the ease of use. This Supplement, therefore, includes new documents, revisions, and updates issued and published since December 1991 and up to and including March 1993. It incorporates various enhancements in order to better serve the user community. One such enhancement included in this Supplement is the new Equipment Classification Index that is described in the User Guide section of this publication. 37 papers, including Bulletins, Federal rules, Generic Letters, Notices, Regulatory Guides, IEEE Standards, IEEE Recommended Practices, and IEEE Guides, have been processed separately for inclusion on the data base

  12. Nuclear EQ sourcebook: A compilation of documents for nuclear equipment qualification

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    In the nuclear power industry, environmental and seismic qualification of safety-related electrical and instrumentation equipment is collectively known as Equipment Qualification (EQ). Related technology, as well as regulatory requirements, have evolved rapidly during the last 15 years. For environmental qualification, what began in 1971 with one trial-use guide (IEEE Std 323-1971), now stands as a full complement of Nuclear Regulatory Commission (NRC) rules, guides and industry standards. In addition to the Institute of Electrical and Electronics Engineers (IEEE), the American Society of Mechanical Engineers (ASME) has also undertaken development of its own set of standards for use in qualifying safety-related mechanical equipment. To ensure that the original design and qualification is preserved, engineers need to select and use the correct set of NRC regulations, regulatory guides, industry standards, and generic correspondence. Given that the total number of these documents exceed 200, this task becomes resource intensive. This compilation is the first known publication available to serve the user-community need for a complete and exhaustive single source. Approximately 180 items (Bulletins, Federal Rules, Generic Letters, Notices, Regulatory Guides, IEEE Standards, IEEE Recommended Practices, and IEEE Guides) have been processed separately for inclusion on the data base

  13. Design evaluation of the semi-prototype for the ITER blanket first wall qualification

    International Nuclear Information System (INIS)

    Lee, Dong Won; Bae, Young Dug; Kim, Suk Kwon; Kim, Sun Ho; Hong, Bong Guen; Bang, In Cheol

    2010-01-01

    For the second qualification of the First Wall (FW) procurement of the International Thermonuclear Experimental Reactor (ITER), a semi-prototype of the FW has been designed with increased local surface heat flux up to 5 MW/m 2 . With the given conditions, the new semi-prototype design was simulated with the commercial CFD code, the ANSYS-11. The results show that the semi-prototype temperature exceeds the melting temperature of Be, and the current design is required to be modified. In order to enhance cooling, a hypervapotron was added in the design and an analysis with the same code was performed. The results show that the temperature with the hypervapotron reduced by around 100 o C but it was still higher than the melting temperature of Be. The hypervapotron mock-up was fabricated and tested with a variance of inlet coolant flow rates and heat fluxes of up to 1.75 MW/m 2 using the second Korea Heat Load Test (KoHLT-2) facility, in which heat was loaded by a graphite heater through radiation heating. Wall and coolant temperatures were measured and compared with the simulation results. So far, there is a large difference between the experiments and the simulation, and a next experiment is being prepared.

  14. Qualification of ISI for Bulgarian NPP: UK support

    International Nuclear Information System (INIS)

    Booler, R.

    2000-01-01

    UK Regulator (NII) Phare project provides an assistance to the Bulgarian Regulator in setting up the technical infrastructure for inspection qualification consistent with IAEA Guidelines and western European practice. The Strategy Document defines the methodology for inspection qualification and general roles and responsibilities of the involved organizations. The Qualification Inputs Document describes the information required for the Technical Specifications (component details, inspection aims and limitations). It applies the idea of qualification level - level 1(lowest) to level 3 (highest). The Qualification Procedure Document provides a guidance to the utility ('Kozloduy' NPP) on the preparation of Qualification Procedures (QP). The appendix provides a specific guidance on the performance of the all aspects of qualification at different levels and recommendations for technical justification. QB Method Working Document provides guidance for the Qualification Body. Facilities and Resources Document defines the facilities and resources required for the Qualification Body to perform the tasks described in the Method Working Document. High level QA Document defines the principles of quality control. Other issues and progress report are also presented

  15. LTP fibre injector qualification and status

    International Nuclear Information System (INIS)

    Bogenstahl, J; Cunningham, L; Fitzsimons, E D; Hough, J; Killow, C J; Perreur-Lloyd, M; Robertson, D; Rowan, S; Ward, H

    2009-01-01

    This paper presents the current state of the LISA Technology Package (LTP) fibre injector qualification project in terms of vibration and shock tests. The fibre injector is a custom built part and therefore must undergo a full space qualification process. The mounting structure and method for sinusoidal vibration and random vibration tests as well as shock tests will be presented. Furthermore a proposal will be presented to use the fibre injector pair qualification model to build an optical prototype bench. The optical prototype bench is a full-scale model of the flight model. It will be used for development and rehearsal of all the assembly stages of the flight model and will provide an on-ground simulator for investigation as an updated engineering model.

  16. Full parabolic trough qualification from prototype to demonstration loop

    Science.gov (United States)

    Janotte, Nicole; Lüpfert, Eckhard; Pottler, Klaus; Schmitz, Mark

    2017-06-01

    On the example of the HelioTrough® collector development the full accompanying and supporting qualification program for large-scale parabolic trough collectors for solar thermal power plants is described from prototype to demonstration loop scale. In the evaluation process the actual state and the optimization potential are assessed. This includes the optical and geometrical performance determined by concentrator shape, deformation, assembly quality and local intercept factor values. Furthermore, its mechanical performance in terms of tracking accuracy and torsional stiffness and its thermal system performance on the basis of the overall thermal output and heat loss are evaluated. Demonstration loop tests deliver results of collector modules statistical slope deviation of 1.9 to 2.6 mrad, intercept factor above 98%, peak optical performance of 81.6% and heat loss coefficients from field tests. The benefit of such a closely monitored development lies in prompt feedback on strengths, weaknesses and potential improvements on the new product at any development stage from first module tests until demonstration loop evaluation. The product developer takes advantage of the achieved technical maturity, already before the implementation in a commercial power plant. The well-understood performance characteristics allow the reduction of safety margins making the new HelioTrough collector competitive from the start.

  17. NASAwide electronic publishing system: Prototype STI electronic document distribution, stage-4 evaluation report

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual frame work, functional description, and technical report server of the STI Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware, and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices, which arc contained in Part 2 of this document, consist of (1) STI EDD Project Plan, (2) Team members, (3) Phasing Schedules, (4) Accessing On-line Reports, and (5) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desktop publishing systems, and technical report servers to be able to provide to NASA's engineers, researchers, scientists, and external users the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  18. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    International Nuclear Information System (INIS)

    Mitteau, Raphaël; Eaton, R.; Perez, G.; Zacchia, F.; Banetta, S.; Bellin, B.; Gervash, A.; Glazunov, D.; Chen, J.

    2015-01-01

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  19. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    Energy Technology Data Exchange (ETDEWEB)

    Mitteau, Raphaël, E-mail: Raphael.mitteau@iter.org [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Eaton, R.; Perez, G. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Zacchia, F.; Banetta, S.; Bellin, B. [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Gervash, A.; Glazunov, D. [Efremov Research Institute, 189631 St. Petersburg (Russian Federation); Chen, J. [Southwestern Institute of Physics, Huangjing Road, Chengdu 610225 (China)

    2015-10-15

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  20. Environmental qualification - walkdowns: The documentation of configuration information for safety related components, equipment and systems

    International Nuclear Information System (INIS)

    Melmer, J.; Waters, M.

    1995-01-01

    Environmental Qualification walkdowns are conducted to collect field data to verify/validate/document configurations of safety related equipment and systems. This paper describes the process for conducting walkdowns and the justification for using an electronic format. The following are described: a) Background; b) Preparing, executing and processing walkdowns; c) Hardware/software; d) Impact of a paperless system on walkdown execution, maintenance and work planning; e) Other applications for the technology

  1. Progress of ITER full tungsten divertor technology qualification in Japan: Manufacturing full-scale plasma-facing unit prototypes

    International Nuclear Information System (INIS)

    Ezato, Koichiro; Suzuki, Satoshi; Seki, Yohji; Yamada, Hirokazu; Hirayama, Tomoyuki; Yokoyama, Kenji; Escourbiac, Frederic; Hirai, Takeshi

    2016-01-01

    Highlights: • JADA has demonstrated the feasibility of manufacturing the full-W plasma-facing units (W-PFU). • The surface profiles of the W monoblocks of the W-PFU prototypes on the test frame to mimic the support structure of the ITER OVT were examined by using an optical three-dimensional measurement system. The results show the most W monoblock surface in the target part locates within + 0.25 mm from the CAD data. • The strict profile control with the profile tolerance of ±0.3 mm is imposed on the OVT to prevent the leading edges of the W monoblocks from over-heating. • The present full-scale prototyping demonstrates to satisfy this requirement on the surface profile. • It can be concluded that the technical maturities of JADA and its suppliers are as high as to start series manufacturing the ITER divertor components. - Abstract: Japan Atomic Energy Agency (JAEA) is in progress for technology demonstration toward Full-tungsten (W) ITER divertor outer vertical target (OVT), especially, W monoblock technology that needs to withstand the repetitive heat load as high as 20 MW/m 2 for 10 s. Under the framework of the W divertor qualification program developed ITER organization, JAEA as Japanese Domestic Agency (JADA) manufactured seven full-scale plasma-facing unit (PFU) prototypes with the Japanese industries. Four prototypes that have 146 W monoblock joint with casted copper (Cu) interlayer passed successfully the ultrasonic testing. In the other three prototypes that have the different W/Cu interlayer joint, joint defects were found. The dimension measurements reveal the requirements of the gap between W monoblocks and the surface profile of PFU are feasible.

  2. Progress of ITER full tungsten divertor technology qualification in Japan: Manufacturing full-scale plasma-facing unit prototypes

    Energy Technology Data Exchange (ETDEWEB)

    Ezato, Koichiro, E-mail: ezato.koichiro@jaea.go.jp [Department of ITER Project, Naka Fusion Institute, Sector of Fusion Research and Development, Japan Atomic Energy Agency (Japan); Suzuki, Satoshi; Seki, Yohji; Yamada, Hirokazu; Hirayama, Tomoyuki; Yokoyama, Kenji [Department of ITER Project, Naka Fusion Institute, Sector of Fusion Research and Development, Japan Atomic Energy Agency (Japan); Escourbiac, Frederic; Hirai, Takeshi [ITER Organization, route de vinon sur Verdon, 13067 St Paul lez Durance (France)

    2016-11-01

    Highlights: • JADA has demonstrated the feasibility of manufacturing the full-W plasma-facing units (W-PFU). • The surface profiles of the W monoblocks of the W-PFU prototypes on the test frame to mimic the support structure of the ITER OVT were examined by using an optical three-dimensional measurement system. The results show the most W monoblock surface in the target part locates within + 0.25 mm from the CAD data. • The strict profile control with the profile tolerance of ±0.3 mm is imposed on the OVT to prevent the leading edges of the W monoblocks from over-heating. • The present full-scale prototyping demonstrates to satisfy this requirement on the surface profile. • It can be concluded that the technical maturities of JADA and its suppliers are as high as to start series manufacturing the ITER divertor components. - Abstract: Japan Atomic Energy Agency (JAEA) is in progress for technology demonstration toward Full-tungsten (W) ITER divertor outer vertical target (OVT), especially, W monoblock technology that needs to withstand the repetitive heat load as high as 20 MW/m{sup 2} for 10 s. Under the framework of the W divertor qualification program developed ITER organization, JAEA as Japanese Domestic Agency (JADA) manufactured seven full-scale plasma-facing unit (PFU) prototypes with the Japanese industries. Four prototypes that have 146 W monoblock joint with casted copper (Cu) interlayer passed successfully the ultrasonic testing. In the other three prototypes that have the different W/Cu interlayer joint, joint defects were found. The dimension measurements reveal the requirements of the gap between W monoblocks and the surface profile of PFU are feasible.

  3. Nuclear Criticality Safety Department Qualification Program

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1996-01-01

    The Nuclear Criticality Safety Department (NCSD) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSD technical and managerial qualification as required by the Y-1 2 Training Implementation Matrix (TIM). This Qualification Program is in compliance with DOE Order 5480.20A and applicable Lockheed Martin Energy Systems, Inc. (LMES) and Y-1 2 Plant procedures. It is implemented through a combination of WES plant-wide training courses and professional nuclear criticality safety training provided within the department. This document supersedes Y/DD-694, Revision 2, 2/27/96, Qualification Program, Nuclear Criticality Safety Department There are no backfit requirements associated with revisions to this document

  4. Inspection procedure and essential parameters in NDT qualification

    International Nuclear Information System (INIS)

    Sarkimo, M.

    2000-06-01

    The objective of the inspection qualification is to ensure that applied non-destructive methods (NDT) have the required performance. The approach of the qualification process is systematic and carefully documented and therefore some new requirements can be seen concerning the composition of the documentation. There are also new document types, that only application of the inspection qualification requires. The most important of these is the technical justification, that includes the documented evidences concerning the performance of the inspection system. This publication includes two reports: 'Compilation of the inspection procedure' and 'Essential/influential parameters in NDT qualification'. The former of these discusses the issues to be considered in an inspection procedure especially from the point of view of the mechanised ultrasonic testing. The later report explains the parameters formulated to analyse in the technical justification all aspects of the inspection application. (orig.)

  5. NASAwide electronic publishing system-prototype STI electronic document distribution: Stage-4 evaluation report. Part 2; Appendices

    Science.gov (United States)

    Tuey, Richard C.; Collins, Mary; Caswell, Pamela; Haynes, Bob; Nelson, Michael L.; Holm, Jeanne; Buquo, Lynn; Tingle, Annette; Cooper, Bill; Stiltner, Roy

    1996-01-01

    This evaluation report contains an introduction, seven chapters, and five appendices. The Introduction describes the purpose, conceptual framework, functional description, and technical report server of the Scientific and Technical Information (STI) Electronic Document Distribution (EDD) project. Chapter 1 documents the results of the prototype STI EDD in actual operation. Chapter 2 documents each NASA center's post processing publication processes. Chapter 3 documents each center's STI software, hardware. and communications configurations. Chapter 7 documents STI EDD policy, practices, and procedures. The appendices consist of (A) the STI EDD Project Plan, (B) Team members, (C) Phasing Schedules, (D) Accessing On-line Reports, and (E) Creating an HTML File and Setting Up an xTRS. In summary, Stage 4 of the NASAwide Electronic Publishing System is the final phase of its implementation through the prototyping and gradual integration of each NASA center's electronic printing systems, desk top publishing systems, and technical report servers, to be able to provide to NASA's engineers, researchers, scientists, and external users, the widest practicable and appropriate dissemination of information concerning its activities and the result thereof to their work stations.

  6. High Heat Flux Test of the ITER FW Semi-prototype Mockups

    International Nuclear Information System (INIS)

    Bae, Young Dug; Lee, Dong Won; Kim, Suk Kwon; Yoon, Jae Sung; Hong, Bong Guen

    2010-01-01

    As a procurement party of the ITER (International Thermonuclear Experimental Reactor) blanket project, we have to pass the qualification program which comprises two distinct phases; Phases 1 is about qualifying joining techniques, and phase 2 covers production scaled up component which is so called 'semi-prototype' and the enhanced heat flux qualification. We have constructed the FWQMs (First Wall Qualification Mockups) and already passed the qualification thermal fatigue tests organized by the IO (ITER Organization). The tests were performed at the EB-1200 in the USA and at the BESTH /JUDITH-2 in the EU. For the phase 2 qualification, the semi-prototype design will be provided by the IO. Even though the design has not fixed because the generic design of the first wall is not fixed, it shall comprise a minimum of 3 full length pairs of first wall fingers. We designed and fabricated two semi-prototype mockups which have a full length pair of first wall finger. The two mockups were designed to have different types of the cooling channels; one has a plain rectangular cross-section and the other has a hypervapotron type cooling channel. In order to compare the cooling capability of the two types, we performed high heat flux tests of the two mockups at the KoHLT-2

  7. Program description for the qualification of CNEA - Argentina as a supplier of LEU silicide fuel and post-irradiation examinations plan for the first prototype irradiated in Argentina

    International Nuclear Information System (INIS)

    Rugirello, Gabriel; Adelfang, Pablo; Denis, Alicia; Zawerucha, Andres; Marco, Agustin di; Guillaume, Eduardo; Sbaffoni, Monica; Lacoste, Pablo

    1998-01-01

    In this report we present a description of the ongoing and future stages of the program for the qualification of CNEA, Argentina, as a supplier of low enriched uranium silicide fuel elements for research reactor. Particularly we will focus on the characteristics of the future irradiation experiment on a new detachable prototype, the post-irradiation examinations (PIE) plan for the already irradiated prototype PO4 and an overview of the recently implemented PIE facilities and equipment. The program is divided in several steps, some of which have been already completed. It concludes: development of the uranium silicide fissile material, irradiation and PIE of several full-scale prototypes. Important investments have been already carried out in the facilities for the FE production and PIE. (author)

  8. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  9. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    International Nuclear Information System (INIS)

    Sarkimo, M.; Pitkaenen, J.

    2013-12-01

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  10. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sarkimo, M. [VTT Technical Research Centre of Finland, Espoo (Finland); Pitkaenen, J.

    2013-12-15

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  11. Mechanical properties used for the qualification of transport casks

    International Nuclear Information System (INIS)

    Salzbrenner, R.; Crenshaw, T.B.; Sorenson, K.B.

    1993-01-01

    The qualification process that should be sufficient for qualification of a specific cask (material/geometry combination) has been examined. The prototype cask should be tested to determine its overall variation in microstructure, chemistry, and mechanical properties. This prototype may also be subjected to 'proof testing' to demonstrate the validity of the design analysis (including the mechanical properties used in the analysis). The complete mechanical property mapping does not necessarily have to precede the proof testing (i.e., portions of the cask which experience only low (elastic) loads during the drop test are suitable for mechanical test specimens). The behavior of the prototype cask and the production casks are linked by assuring that each cask possesses at least the minimum level of one or more critical mechanical properties. This may be done by measuring the properties of interest directly, or by relying on a secondary measurement (such as subsize mechanical test results or microstructure/compositional measurements) which has been statistically correlated to the critical properties. The database required to show the correlation between the secondary measurement and the valid design property may be established by tests on the material from the prototype cask. The production controls must be demonstrated as being adequate to assure that a uniform product is produced. The testing of coring (or test block or prolongation) samples can only be viewed as providing a valid link to the benchmark results provided by the prototype cask if the process used to create follow-on casks remains essentially similar. The MOSAIK Test Program has demonstrated the qualification method through the benchmarking stage. The program did not establish for qualifying serial production casks through, for example, a correlation between small specimen parameters and valid design fracture toughness properties. Such a correlation would require additional experimental work. (J.P.N.)

  12. Nuclear energy electricity technical regulation on the qualification

    International Nuclear Information System (INIS)

    1995-01-01

    It tells the range of application purpose and of the qualification. It describes how to qualify of the class 1 E equipment, which are type test, operating experience, analysis and combined method. Next it deals with qualification procedure, which are specification requirement, requirement of qualification program, type testing, operating experience, analysis and combined qualification, acceptance criteria modification and extension with qualified life, simulated test profiles and document about type test data, operating experience data and extrapolation.

  13. Europeans come together on qualification

    International Nuclear Information System (INIS)

    Whittle, J.

    1996-01-01

    Utilities operating nuclear power plants in Europe have formed the European Network for Inspection Qualification (ENIQ) to produce a common approach to demonstrating that non-destructive testing is capable providing the information to ensure the absence of significant defects in nuclear plants. Major developments over recent months have included the issue by ENIQ of a formal document defining the methodology for the conduct of qualification which sets out the principles that detailed systems, within an individual country context, should embody. A pilot study on pipe welds typical of those in BWR recirculation loops is being conducted to explore the issues involved in the practical application of the methodology. In parallel with ENIQ, the European Nuclear Regulators Working Group has set up a Task Force in an attempt to define a common regulatory position on non-destructive testing qualifications and has produced its own document which is wider in scope than that of ENIQ. (UK)

  14. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  15. On safety 1E qualification of electrical equipment for nuclear power stations

    International Nuclear Information System (INIS)

    Segarceanu, D.; Geambasu, C.; Avramescu, M.

    1995-01-01

    Electrical equipment and systems for the emergency shutdown of a nuclear reactor are qualified according to safety class 1E. Methods of qualification meeting the requirements should be used, either individually or in combination include, type-test qualification, qualification by operating experience, qualification by analysis, combined qualification. These methods qualification principles, procedures and documents are discussed. (N.T.). 1 fig

  16. A prototype of a documentation system that supports the development and maintenance of product configuration systems

    DEFF Research Database (Denmark)

    Haug, Anders; Degn, Anders; Poulsen, Bjarne

    2007-01-01

    , such as shorter lead times, reductions of resources needed and fewer errors. A procedure for the development and maintenance of PCSs, which has been applied in configuration projects for more than ten years, includes three main modelling techniques to support the development and maintenance of PCSs. Unfortunately...... system that supports the development and maintenance of PCSs. This article describes how some of this research has been converted into a prototype of a documentation system and what has been learned from the evaluation of the prototype...

  17. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  18. Prototype development and demonstration for response, emergency staging, communications, uniform management, and evacuation (R.E.S.C.U.M.E.) : R.E.S.C.U.M.E. prototype system design document.

    Science.gov (United States)

    2014-04-01

    This report documents the System Design Document (SDD) for the prototype development and demonstration of the : Response, Emergency Staging, Communications, Uniform Management, and Evacuation (R.E.S.C.U.M.E.) application : bundle, with a focus on the...

  19. 27 CFR 19.823 - Changes after original qualification.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Changes after original... Vaporizing Process Qualification Documents § 19.823 Changes after original qualification. When there is a change in the information recorded in the original approved application, the proprietor shall make a...

  20. Software qualification of selected TOUGH2 modules

    International Nuclear Information System (INIS)

    Wu, Y.S.; Ahlers, C.F.; Fraser, P.; Simmons, A.; Pruess, K.

    1996-10-01

    The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of the single-phase Gas (EOS1G), Effective Continuum Method (ECM), Saturated/Unsaturated Flow (EOS9), and Radionuclide Transport (T2R3D) modules of TOUGH2, a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. This report contains the following sections: (1) Requirements Specification, (2) Design Description, (3) Software Validation Test Plan and Report, (4) Software User Documentation, and (5) Appendices. These sections comprise sequential parts of the Software Life Cycle, and are not intended to stand alone but should be used in conjunction with the TOUGH User's Guide (Pruess, 1987), TOUGH2--A General Purpose Numerical Simulator for Multiphase Fluid and Heat Flow (Pruess, 1991), and the above-referenced TOUGH2 software qualification document. The qualification package is complete with the attached Software Identification Form and executable source code for the single-phase Gas, Effective Continuum method, Saturated/Unsaturated Flow, and Radionuclide Transport modules of TOUGH2

  1. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  2. Evaluation of a prototype infrasound system

    International Nuclear Information System (INIS)

    Whitaker, R.; Sandoval, T.; Breding, D.; Kromer, D.

    1997-01-01

    Under Department of Energy sponsorship, Sandia National Laboratories and Los Alamos National Laboratory cooperated to develop a prototype infrasonic array, with associated documentation, that could be used as part of the International Monitoring System. The United States Government or foreign countries could procure commercially available systems based on this prototype to fulfill their Comprehensive Test Ban Treaty (CTBT) obligations. The prototype is a four-element array in a triangular layout as recommended in CD/NTB/WP.224 with an element at each corner and one in the center. The prototype test configuration utilize an array spacing of 1 km. The prototype infrasound system has the following objectives: (1) Provide a prototype that reliably acquires and transmits near real-time infrasonic data to facilitate the rapid location and identification of atmospheric events. (2) Provide documentation that could be used by the United States and foreign countries to procure infrasound systems commercially to fulfill their CTBT responsibilities. Infrasonic monitoring is an effective, low cost technology for detecting atmospheric explosions. The low frequency components of explosion signals propagate to long ranges (few thousand kilometers) where they can be detected with an array of sensors. Los Alamos National Laboratory's expertise in infrasound systems and phenomenology when combined with Sandia's expertise in providing verification quality system for treaty monitoring make an excellent team to provide the prototype infrasound sensor system. By September 1997, the prototype infrasound system will have been procured, integrated, evaluated and documented. Final documentation will include a system requirements document, an evaluation report and a hardware design document. The hardware design document will describe the various hardware components used in the infrasound prototype and their interrelationships

  3. Return of IEEE Std 627 and its Value to Equipment Qualification Programs

    International Nuclear Information System (INIS)

    Horvath, D.A.

    2012-01-01

    IEEE Std 627 ''Design Qualification of Safety Systems Equipment Used in Nuclear Power Generating Stations'' was issued to more generically establish qualification requirements in the form of a high level umbrella document. Efforts on this standard began in late 1975 at the request of the IEEE Nuclear Standards Management Board. In 1977 a joint ASME/IEEE agreement established responsibility for qualification and quality assurance standards preparation. ASME accepted responsibility for Quality Assurance and IEEE for qualification. In accordance with that agreement, IEEE completed the generic qualification standard in 1980. This document provided high level approaches, criteria, guidance, and principles for qualification of both electrical and mechanical equipment that at that time appeared in no other industry standard. IEEE Std 627-1980 was later reaffirmed in 1996. In 1986, ASME's Board on Nuclear Codes and Standards directed its Committee on Qualification of Mechanical Equipment (QME) to develop a standard for qualifying mechanical equipment. This task was completed in several parts during the time frame from 1992 to 1994. Partly in response to this activity, IEEE Std 627 was withdrawn in 2002. Later although withdrawn, it was found that IEEE Std 627 was continuing to be used and referenced by many entities both in the US and other countries including in ASME's QME-1-2002 ''Qualification of Active Mechanical Equipment Used in Nuclear Power Plants'', US NRC's NUREG-0800 Standard Review Plan Section 3.11, at least one reactor vendor's Design Certification Document (DCD), several international licensing documents, and elsewhere. As a result, in 2007, the IEEE Standards Board authorized Working Group 2.10 of Subcommittee 2 (Qualification) of the Power and Energy Society's Nuclear Power Engineering Committee to resurrect and update IEEE Std 627-1980 (Reaff 1996). The result was the culmination IEEE Std 627 in 2010. This paper will report on the eight improvements made

  4. Application of Microprocessor-Based Equipment in Nuclear Power Plants - Technical Basis for a Qualification Methodology

    International Nuclear Information System (INIS)

    Korsah, K.

    2001-01-01

    This document (1) summarizes the most significant findings of the ''Qualification of Advanced Instrumentation and Control (I and C) Systems'' program initiated by the Nuclear Regulatory Commission (NRC); (2) documents a comparative analysis of U.S. and European qualification standards; and (3) provides recommendations for enhancing regulatory guidance for environmental qualification of microprocessor-based safety-related systems. Safety-related I and C system upgrades of present-day nuclear power plants, as well as I and C systems of Advanced Light-Water Reactors (ALWRs), are expected to make increasing use of microprocessor-based technology. The Nuclear Regulatory Commission (NRC) recognized that the use of such technology may pose environmental qualification challenges different from current, analog-based I and C systems. Hence, it initiated the ''Qualification of Advanced Instrumentation and Control Systems'' program. The objectives of this confirmatory research project are to (1) identify any unique environmental-stress-related failure modes posed by digital technologies and their potential impact on the safety systems and (2) develop the technical basis for regulatory guidance using these findings. Previous findings from this study have been documented in several technical reports. This final report in the series documents a comparative analysis of two environmental qualification standards--Institute of Electrical and Electronics Engineers (IEEE) Std 323-1983 and International Electrotechnical Commission (IEC) 60780 (1998)--and provides recommendations for environmental qualification of microprocessor-based systems based on this analysis as well as on the findings documented in the previous reports. The two standards were chosen for this analysis because IEEE 323 is the standard used in the U.S. for the qualification of safety-related equipment in nuclear power plants, and IEC 60780 is its European counterpart. In addition, the IEC document was published in

  5. AGR-1 Data Qualification Report

    International Nuclear Information System (INIS)

    Abbott, Michael

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office (TDO) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor experiment (AGR-1), the processing of these data within NDMAS, and reports the qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. They include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent quality assurance program. The NDMAS database processing and qualification status of the following five data streams is reported in this document: (1) Fuel fabrication data. All data have been processed into the NDMAS database and qualified (1,819 records). (2) Fuel irradiation data. Data from all 13 AGR-1 reactor cycles have been processed into the NDMAS database and tested. Of these, 85% have been qualified and 15% have failed NDMAS accuracy testing. (3) FPMS data. Reprocessed (January 2010) data from all 13 AGR-1 reactor cycles have been processed into the database and capture tested. Final qualification of these data will be recorded after QA approval of an Engineering Calculations and Analysis Report currently

  6. Safety design guides for environmental qualification for CANDU 9

    International Nuclear Information System (INIS)

    Lee, Duk Su; Chang, Woo Hyun; Lee, Nam Young; A. C. D. Wright

    1996-03-01

    This safety design guide describes the safety philosophy and requirements for the environmental qualification of safety related systems and components for CANDU 9. The environmental qualification program identifies the equipments to be qualified and conditions to be used for qualification and provides comprehensive set of documentation to ensure that the qualification is complete and can be maintained for the life of the plant. A summary of the system, components and structures requiring environmental qualification is provided in the table for the guidance of the system design, and this table will be subject to change or confirmation by the environmental qualification program. Also, plant ares subject to harsh environment is provided in the figure. The change status of the regulatory requirements, code and standards should be traced and this safety design guide shall be updated accordingly. 1 tab., 5 figs. (Author) .new

  7. Product qualification: a barrier to point-of-care microfluidic-based diagnostics?

    Science.gov (United States)

    Tantra, Ratna; van Heeren, Henne

    2013-06-21

    One of the most exciting applications of microfluidics-based diagnostics is its potential use in next generation point-of-care (POC) devices. Many prototypes are already in existence, but, as of yet, few have achieved commercialisation. In this article, we consider the issue surrounding product qualification as a potential barrier to market success. The study discusses, in the context of POC microfluidics-based diagnostics, what the generic issues are and potential solutions. Our findings underline the need for a community-based effort that is necessary to speed up the product qualification process.

  8. Non-destructive qualification tests for ITER cryogenic axial insulating breaks

    International Nuclear Information System (INIS)

    Kosek, Jacek; Lopez, Roberto; Tommasini, Davide; Rodriguez-Mateos, Felix

    2014-01-01

    In the ITER superconducting magnets the dielectric separation between the CICC (Cable-In-Conduit Conductors) and the helium supply pipes is made through the so-called insulating breaks (IB). These devices shall provide the required dielectric insulation at a 30 kV level under different types of stresses and constraints: thermal, mechanical, dielectric and ionizing radiations. As part of the R and D program, the ITER Organization launched contracts with industrial companies aimed at the qualification of the manufacturing techniques. After reviewing the main functional aspects, this paper describes and discusses the protocol established for non-destructive qualification tests of the prototypes

  9. Non-destructive qualification tests for ITER cryogenic axial insulating breaks

    Energy Technology Data Exchange (ETDEWEB)

    Kosek, Jacek [Wroclaw University of Technology, Wybrzeze Wyspianskiego 27, 50-370 Wroclaw, Poland and CERN, Geneva 23,CH-1211 (Switzerland); Lopez, Roberto; Tommasini, Davide [CERN, Geneva 23,CH-1211 (Switzerland); Rodriguez-Mateos, Felix [CERN, Geneva 23,CH-1211, Switzerland and ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul lez Durance (France)

    2014-01-29

    In the ITER superconducting magnets the dielectric separation between the CICC (Cable-In-Conduit Conductors) and the helium supply pipes is made through the so-called insulating breaks (IB). These devices shall provide the required dielectric insulation at a 30 kV level under different types of stresses and constraints: thermal, mechanical, dielectric and ionizing radiations. As part of the R and D program, the ITER Organization launched contracts with industrial companies aimed at the qualification of the manufacturing techniques. After reviewing the main functional aspects, this paper describes and discusses the protocol established for non-destructive qualification tests of the prototypes.

  10. Qualification tests of materials for spallation neutron sources

    International Nuclear Information System (INIS)

    Sommer, W.F.; Maloy, S.; Wechsler, M.S.

    1997-01-01

    Several laboratories will take part in an extensive materials qualification program that includes irradiation in the proton beam and neutron field available at the Los Alamos Spallation Radiation Damage Facility (LASREF). A number of candidate materials will be exposed to prototypic spallation producing particle radiation. Studies of corrosion-related phenomena and the mitigation of these effects will also be accomplished

  11. Radiated EMC& EMI Management During Design Qualification and Test Phases on LEO Satellites Constellation

    Science.gov (United States)

    Blondeaux, H.; Terral, M.; Gutierrez-Galvan, R.; Baud, C.

    2016-05-01

    The aim of the proposed paper is to present the global radiated EMC/EMI approach applied by Thales Alenia Space in the frame of a telecommunication Low Earth Orbit (LEO) satellites constellation program. The paper will present this approach in term of analyses, of specific characterisation and of sub-system and satellite tests since first design reviews up-to satellite qualification tests on Prototype Flight Model (PFM) and to production tests on reduced FMs. The global aim is : 1 - to reduce risk and cost (units EMC delta qualification, EMC tests at satellite level for the 81 Space Vehicles (SV) through appropriated EMC analyses (in term of methodologies and contours) provided in the frame of design reviews.2 - to early anticipate potential critical case to reduce the impact in term of engineering/qualification/test extra cost and of schedule.3 - to secure/assure the payload and SV design/layout.4 - to define and optimize the EMC/EMI test campaigns to be performed on Prototype Flight Model (PFM) for complete qualification and on some FMs for industrial qualification/validation.The last part of the paper is dedicated to system Bite Error Rate (BER) functional test performed on PFM SV to demonstrate the final compatibility between the three on-board payloads and to the Internal EMC tests performed on PFM and some FMs to demonstrate the SV panel RF shielding efficiency before and after environmental tests and the Thales Alenia Space (TAS) and Orbital AKT (OATK) workmanships reproducibility.

  12. Commercial Parts Technology Qualification Processes

    Science.gov (United States)

    Cooper, Mark S.

    2013-01-01

    Many high-reliability systems, including space systems, use selected commercial parts (including Plastic Encapsulated Microelectronics or PEMs) for unique functionality, small size, low weight, high mechanical shock resistance, and other factors. Predominantly this usage is subjected to certain 100% tests (typically called screens) and certain destructive tests usually (but not always) performed on the flight lot (typically called qualification tests). Frequently used approaches include those documented in EEE-INST-002 and JPL DocID62212 (which are sometimes modified by the particular aerospace space systems manufacturer). In this study, approaches from these documents and several space systems manufacturers are compared to approaches from a launch systems manufacturer (SpaceX), an implantable medical electronics manufacturer (Medtronics), and a high-reliability transport system process (automotive systems). In the conclusions section, these processes are outlined for all of these cases and presented in tabular form. Then some simple comparisons are made. In this introduction section, the PEM technology qualification process is described, as documented in EEE-INST-002 (written by the Goddard Space Flight Center, GSFC), as well as the somewhat modified approach employed at the Jet Propulsion Laboratory (JPL). Approaches used at several major NASA contractors are also described

  13. The implementing of the training, examination and qualification for QA auditor

    International Nuclear Information System (INIS)

    Ma Xiaozheng; Han Peicong; Zhang Zhongyuan; Zhu Guoliang

    2007-01-01

    China Power Investment Corporation has implemented the training, examination and qualification for QA auditor based on the related requirements of the nuclear safety documents. The bases, planning of the procedure, implementing procedure and suggestions for implementing the training, examination and qualification are described in this article. That can be used as the reference for implementing the training, examination and qualification for QA auditor, as well as for establishment of the related guide. (authors)

  14. Qualification test on class 1E charger and inverter in nuclear power plant

    International Nuclear Information System (INIS)

    Li Mingcheng; Lin Jian; Fu Mingxing; Xu Benfu; Ma Peifeng

    2014-01-01

    The qualification approach for class lE electrical equipment was introduced, based on IEC, IEEE and RCC-E standards and technical documents. Combined with a lot of practical experience, the qualification scheme for class lE charger and inverter was developed. The component evaluation, performance and stress test, EMC test, seismic test and software qualification for the equipment were analyzed in detail. (authors)

  15. The HTR modular power reactor system. Qualification of fuel elements and materials

    International Nuclear Information System (INIS)

    Heidenreich, U.; Breitling, H.; Nieder, R.; Ohly, W.; Mittenkuehler, A.; Ragoss, H.; Seehafer, H.J.; Wirtz, K.; Serafin, N.

    1989-01-01

    For further development of the HTR modular power reactor system (HTR-M-KW), the project activities for 'Qualification of fuel elements and materials' reported here cover the work for specifying the qualifications to be met by metallic and ceramic materials, taking into account the design-based requirements and the engineered safety requirements. The fission product retention data determined for the HTR modular reactor fuel elements could be better confirmed by evaluation of the experiments, and have been verified by various calculation methods for different operating conditions. The qualification of components was verified by strength analyses including a benchmark calculation for specified normal operation and emergencies; the results show a convenient behaviour of the components and their materials. In addition, a fuel element burnup measuring system was designed that applies Cs-137 gamma spectroscopy; its feasibility was checked by appropriate analyses, and qualification work is in progress. The installation of a prototype measurement system is the task for project No. 03 IAT 211. (orig.) [de

  16. Nuclear power plants. Electrical equipment of the safety system. Qualification

    International Nuclear Information System (INIS)

    2001-01-01

    This International Standard applies to electrical parts of safety systems employed at nuclear power plants, including components and equipment of any interface whose failure could affect unfavourably properties of the safety system. The standard also applies to non-electrical safety-related interfaces. Furthermore, the standard describes the generic process of qualification certification procedures and methods of qualification testing and related documentation. (P.A.)

  17. Design and Analysis of the Korean Small Semi-prototype Mock-up for the 2nd Qualification of the ITER Blanket First Wall

    International Nuclear Information System (INIS)

    Lee, Dong Won; Kim, Suk Kwon; Yoon, Jae Sung; Lee, Eo Hwak; Lee, Seung Jae; Choi, Bo Guen; Park, Jeong Yong; Jung, Yang Il; Choi, Byung Kwon; Kim, Byoung Yoon

    2011-01-01

    Since the blanket First Wall (FW) of the International Thermonuclear Experimental Reactor (ITER) is subjected to a high heat and high neutron loads, it is one of the most important components. It composed of a beryllium (Be) layer as a plasma facing material, a copper alloy (CuCrZr) layer as a heat sink and type 316L authentic stainless steel (SS316L) as a structure material. The joining of the three different metals is the key issue to be solved. And more, the peak heat load was assumed to be 0.5 MW/m 2 in the initial design of the FW, but it was changed to be up to 5 MW/m 2 In Korea, the joining method has developed and it was proved through the several mock-up fabrication and high heat flux tests for confirming the joining integrity. Some of them were tested in the foreign facilities such as JEBIS at JAEA in Japan, TSEFEY at Efremov in Russia, and JUDITH at FZJ in Germany, and others were tested in our own facilities such as KoHLT-1 and -2. And finally, the 1 st , recently. Therefore, the FW panel design has been changed for enhancing the cooling and ITER Organization will provide the proposed design. Qualification was passed, in which two 80x80x3 Be/Cu/SS mock-ups were tested under 0.625 and 0.875 MW/m 2 heat fluxes for 12,000 cycles and then tested under 1.75 and 1.40 MW/m 2 Currently, the 2 heat fluxes for 1,000 cycles at FZJ and SNL, respectively. Currently, the 2 nd qualification program was started and the semi-prototype should be fabricated by the end of 2011 for testing under 5.0 MW/m 2 heat flux for certain number of cycles. In order to prepare the semi-prototype, several fabrication methods should be developed through the fabrication and test with the several mock-ups. In the present study, small Be mock-up was fabricated as the first step for the preparation. It was fabricated according to the designs considering the currently modified design of the FW. In the present paper, the fabrication objectives, methods, results and related tests were

  18. Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Thomas J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howard, Richard H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rader, Jordan D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

  19. Inspection qualification and implementation of ENIQ in Sweden

    International Nuclear Information System (INIS)

    Zettervall, Tommy

    2013-01-01

    Many countries are currently considering their approaches to inspection qualification and risk-informed in-service inspection (RI-ISI) and are carefully assessing experience data. In Europe most of the utilities operating nuclear power plants have joined together to form the European Network for Inspection Qualification ENIQ. In practice, qualification can be performed with varying degrees of complexity and cost, varying from capability statement based on existing evidence, through to an extensive qualification consisting of a detailed Technical Justification (TJ) together with open and blind trials on full-scale test blocks. An Inspection Qualification is an investigation and demonstration, which confirm that an inspection system has the ability to solve its specific tasks. The qualification is a Quality Assurance of an inspection system based on documents and practical trials. A reliable inspection system, based on a reliable qualification and correct prerequisites, will reduce total costs for Licensees and increase the credibility of the inspection result. To get such inspection system, which could be valid for many years, it's of necessity to fulfil all included parts in the process. It begins with the Technical Specification from Licensee, where input data and requirements about the actual component are specified. To get an inspection system that could live over time, the Technical Justification is of importance. Finally the test blocks and used simulation techniques play an important part of the final result, and these test blocks together with TJ form the basis for qualification body's decision. (author)

  20. AGR-2 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Michael L.

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  1. AGR-2 Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Michael L. Abbott

    2010-09-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  2. Requirements for qualification of manufacture of the ITER Central Solenoid and Correction Coils

    Energy Technology Data Exchange (ETDEWEB)

    Libeyre, Paul, E-mail: paul.libeyre@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Li, Hongwei [ITER China, 15B Fuxing Road, Beijing 100862 (China); Reiersen, Wayne [US ITER Project Office, 1055 Commerce Park Dr., Oak Ridge, TN 37831 (United States); Dolgetta, Nello; Jong, Cornelis; Lyraud, Charles; Mitchell, Neil; Laurenti, Adamo [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Sgobba, Stefano [CERN, CH-1211 Genève 23 (Switzerland); Turck, Bernard [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul lez Durance (France); Martovetsky, Nicolai; Everitt, David; Freudenberg, K.; Litherland, Steve; Rosenblad, Peter [US ITER Project Office, 1055 Commerce Park Dr., Oak Ridge, TN 37831 (United States); Smith, John; Spitzer, Jeff [General Atomics, P.O. Box 85608, San Diego, CA 92186-5608 (United States); Wei, Jing; Dong, Xiaoyu; Fang, Chao [ASIPP, Shushan Hu Road 350, Hefei, Anhui 230031 (China); and others

    2015-10-15

    Highlights: • A manufacturing line is installed for the ITER Correction Coils. • A manufacturing line is under installation for the ITER Central Solenoid. • Qualification of the manufacturing procedures has started for both manufacturing lines and acceptance criteria set. • Winding procedure of Correction Coils is qualified. - Abstract: The manufacturing line of the ITER Correction Coils (CC) at ASIPP in Hefei (China) was completed in 2013 and the manufacturing line of the ITER Central Solenoid (CS) modules is under installation at General Atomic premises in Poway (USA). In both cases, before starting production of the first coils, qualification of the manufacturing procedures is achieved by the construction of a set of mock-ups and prototypes to demonstrate that design requirements defined by the ITER Organization are effectively met. For each qualification item, the corresponding mock-ups are presented with the tests to be performed and the related acceptance criteria. The first qualification results are discussed.

  3. Impact of the draft DOE Training and Qualification Standard on an established training and qualification program

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1999-01-01

    One of the provisions of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 97-2 was that the US Department of Energy (DOE) hor e llipsis Develop and institute ahor e llipsiscourse in criticality and criticality safety hor e llipsis to serve as the foundation for a program of formal qualification of criticality engineers. In response, a draft DOE standard establishing requirements for a formal qualification program for nuclear criticality safety (NCS) engineers has been prepared and is currently in review. The Oak Ridge Y-12 plant implemented a formal training and qualification program for NCS engineers in 1995. The program complies with existing DOE requirements. The program was developed using a performance-based systematic approach to training and is accomplished through structured mentoring where experienced personnel interact with candidates through various learning exercises. Self-study, exercises, and work under instruction are all utilized. The candidate's performance is evaluated by mentors and oral boards. Competency gained through experience at other sites can also be credited. Technical portions of the program are primarily contained in an initial Engineer-in-Training segment and in subsequent task-specific qualifications. The Engineer-in-Training segment exposes the candidate to fundamental NCS concepts through example problems; ensures the initial compliance training requirements are met; and includes readings from applicable procedures, technical documents, and standards. Upon completion of this initial training, candidates proceed to task qualifications. Tasks are defined NCS activities such as operational reviews, criticality safety evaluations, criticality safety computations, criticality accident alarm system (CAAS) evaluations, support for emergency management, etc. Qualification on a task basis serves to break up training into manageable pieces and expedites qualification of candidates to perform specific production activities. The

  4. NRC Information No. 88-04: Inadequate qualification and documentation of fire barrier penetration seals

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    The current NRC review was prompted by reports, inspection findings, allegations, and other information that indicated the possibility that NRC requirements for fire barrier penetration seals were not being met in all aspects. The review included: evaluations of fire barrier penetration seal specifications and procedures developed by licensees, licensee agents, and licensee contractors; evaluations of various fire barrier penetration seal tests and test data; and inspections of various fire barrier penetrations seal designs and installations. The types of concerns identified to date and mentioned below are related to weaknesses in the implementation of NRC requirements and guidelines as related to fire barrier penetration seal design qualification. The NRC review also has identified a current practice that can affect the qualification status of installed seals. Plant modifications are being made that require running new cable and conduits through existing penetration seals. These modifications are generally being made without an associated technical review to ensure that the resulting penetration seal design configuration or design parameters are consistent with those validated by initial qualification tests. Over a period of time, numerous minor modifications to the same area could cumulatively result in a degraded fire barrier rating

  5. Nuclear Criticality Safety Organization qualification program. Revision 4

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1997-01-01

    The Nuclear Criticality Safety Organization (NCSO) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSO technical and managerial qualification as required by the Y-12 Training Implementation Matrix (TIM). It is implemented through a combination of LMES plant-wide training courses and professional nuclear criticality safety training provided within the organization. This Qualification Program is applicable to technical and managerial NCSO personnel, including temporary personnel, sub-contractors and/or LMES employees on loan to the NCSO, who perform the NCS tasks or serve NCS-related positions as defined in sections 5 and 6 of this program

  6. Information for irradiation and post-irradiation of the silicide fuel element prototype P-07

    International Nuclear Information System (INIS)

    Abbate, Maximo J.; Sbaffoni, Maria M.

    2003-01-01

    Included in the 'Silicides' Project, developed by the Nuclear Fuels Department of the National Atomic Energy Commission (CNEA), it is foreseen the qualification of this type of fuel for research reactors in order to be used in the Argentine RA-3 reactor and to confirm the CNEA as an international supplier. The paper presents basic information on several parameters corresponding to the new silicide prototype, called P-07, to be taken into account for its irradiation, postirradiation and qualification. (author)

  7. 1E Qualification of Electrical Equipment - Requirement for Safety Nuclear Power Plants

    International Nuclear Information System (INIS)

    Geambasu, C.; Segarceanu, D.; Albu, J.

    2002-01-01

    The paper presents the qualification methods of the safety related equipment according to the safety class 1E. There are presented the qualification principles, procedure and documents, emphasis being laid on the qualification approach by type tests. This approach assumes the equipment test under both normal and accident conditions (design basis events) simulating the operational conditions and covers the largest part of electrical equipment from a nuclear power plant.The safety related equipment is to be qualified is subjected to a sequential test that will be detailed in the paper. (author)

  8. Buried Waste Program (BWP) data qualification manual

    International Nuclear Information System (INIS)

    Casey, C.; Larson, R.A.; Harris, G.A.

    1989-06-01

    The Data Qualification Manual (DQM) has been developed to discuss the process required to qualify data generated for the Buried Waste Program (BWP). The data from the BWP tasks conducted at the Radioactive Waste Management Complex (RWMC) and elsewhere will lead to remedial decisions being made which are governed by federal regulations administered by the Environmental Protection Agency (EPA). Data qualification is the process of insuring that only data of planned and known qualities are used to make a decision or answer a question. Although it is the Data Integrity Review Committee's (DIRC) responsibility to insure that the quality of all BWP data is ultimately verified and validated, all personnel who participate in the data gathering process will affect the quality of the data and must be responsible for knowing what is required to produce data of the planned quality. Therefore this manual is addressed to all participants in a data-gathering task. This manual discusses requirements to support data qualification in several areas, including: the sampling and analysis plan; data quality objectives and PARCC goals; sample custody documentation; quality assurance; assembly of the data qualification package; and existing data. 23 refs., 4 figs., 6 tabs

  9. Radiological Control Technician: Standardized technician Qualification Standard

    International Nuclear Information System (INIS)

    1992-10-01

    The Qualification Standard states and defines the knowledge and skill requirements necessary for successful completion of the Radiological Control Technician Training Program. The standard is divided into three phases: Phase I concerns RCT Academic training. There are 13 lessons associated with the core academics program and 19 lessons associated with the site academics program. The staff member should sign the appropriate blocks upon successful completion of the examination for that lesson or group of lessons. In addition, facility specific lesson plans may be added to meet the knowledge requirements in the Job Performance Measures (JPM) of the practical program. Phase II concerns RCT core/site practical (JPMs) training. There are thirteen generic tasks associated with the core practical program. Both the trainer/evaluator and student should sign the appropriate block upon successful completion of the JPM. In addition, facility specific tasks may be added or generic tasks deleted based on the results of the facility job evaluation. Phase III concerns the oral examination board successful completion of the oral examination board is documented by the signature of the chairperson of the board. Upon completion of all of the standardized technician qualification requirements, final qualification is verified by the student and the manager of the Radiological Control Department and acknowledged by signatures on the qualification standard. The completed Qualification Standard shall be maintained as an official training record

  10. Qualifications manual for Inspection and Enforcement personnel. Volume I. Detailed data sheets

    International Nuclear Information System (INIS)

    Bartley, H.J.; Heyer, F.H.K.; Schwartz, E.G.; Harrison, O.J.; Krass, I.W.; Welsh, D.M.

    1978-06-01

    This document is the General Research Corporation (GRC) final report on Task I Job/Position Qualifications Statements for the Headquarters and regional position of NRC/IE. It reflects the results of upgrading, expanding, and reformating the preliminary Task I report. To accomplish this, GRC made a thorough examination of all data developed during Task I, Task II (Career Fields), Task III (Training Evaluation), and Task IV (Hiring Qualifications), to include NRC/IE comments and management decisions received. The reformated Job/Position Qualifications Statements resulting from this effort (Appendix A) identify three job qualifications categories for each position--performance, attributes, and knowledge. Two formats are provided: a summarized one for manpower management in Volume I and a detailed one for career and training management in Volume II. In addition to recommending approval of the job/position qualifications, GRC proposes their use in conjunction with the hiring qualifications in the Task IV report to update NRC/IE job descriptions

  11. AGC-3 Experiment Irradiation Monitoring Data Qualification Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hull, Laurence C. [Idaho National Lab. (INL), Idaho Falls, ID (United States). VHTR Technology Development Office

    2014-08-01

    The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. The third experiment, Advanced Graphite Creep 3 (AGC-3), began with Advanced Test Reactor (ATR) Cycle 152B on November 27, 2012, and ended with ATR Cycle 155B on April 23, 2014. This report documents qualification of AGC-3 experiment irradiation monitoring data for use by the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Program for research and development activities required to design and license the first VHTR nuclear plant. Qualified data meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements. Trend data may not meet the requirements, but may still provide some useable information. The report documents qualification of AGC-3 experiment irradiation monitoring data following MCP-2691. This report also documents whether AGC-3 experiment irradiation monitoring data meet the requirements for data collection as specified in technical and functional requirements documents and quality assurance (QA) plans. Data handling is described showing how data are passed from the data collection experiment to the Nuclear Data Management and Analysis System (NDMAS) team. The data structure is described, including data batches, components, attributes, and response variables. The description of the approach to data qualification includes the steps taken to qualify the data and the specific tests used to verify that the data meet requirements. Finally, the current status of the data received by NDMAS from the AGC-3 experiment is presented with summarized information on test results and resolutions. This report addresses all of the irradiation monitoring data collected during the AGC-3 experiment.

  12. Risk D and D Rapid Prototype: Scenario Documentation and Analysis Tool

    International Nuclear Information System (INIS)

    Unwin, Stephen D.; Seiple, Timothy E.

    2009-01-01

    Report describes process and methodology associated with a rapid prototype tool for integrating project risk analysis and health and safety risk analysis for decontamination and decommissioning projects. The objective of the Decontamination and Decommissioning (D and D) Risk Management Evaluation and Work Sequencing Standardization Project under DOE EM-23 is to recommend or develop practical risk-management tools for decommissioning of nuclear facilities. PNNL has responsibility under this project for recommending or developing computer-based tools that facilitate the evaluation of risks in order to optimize the sequencing of D and D work. PNNL's approach is to adapt, augment, and integrate existing resources rather than to develop a new suite of tools. Methods for the evaluation of H and S risks associated with work in potentially hazardous environments are well-established. Several approaches exist which, collectively, are referred to as process hazard analysis (PHA). A PHA generally involves the systematic identification of accidents, exposures, and other adverse events associated with a given process or work flow. This identification process is usually achieved in a brainstorming environment or by other means of eliciting informed opinion. The likelihoods of adverse events (scenarios) and their associated consequence severities are estimated against pre-defined scales, based on which risk indices are then calculated. A similar process is encoded in various project risk software products that facilitate the quantification of schedule and cost risks associated with adverse scenarios. However, risk models do not generally capture both project risk and H and S risk. The intent of the project reported here is to produce a tool that facilitates the elicitation, characterization, and documentation of both project risk and H and S risk based on defined sequences of D and D activities. By considering alternative D and D sequences, comparison of the predicted risks can

  13. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Oliver [European Commission, Joint Research Centre (JRC), Petten (Netherlands). Institute for Energy and Transport (IET); Martin, Etienne [EDF, St Denis (France). Direction Production Ingenierie; Booler, Russ [AMEC Clean Energy Europe, Warrington (United Kingdom); Zetterwall, Tommy [Swedish Qualification Centre, Taeby (Sweden); Walker, Tony [Rolls-Royce Submarines, Derby (United Kingdom)

    2014-10-15

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8{sup th} technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  14. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    International Nuclear Information System (INIS)

    Martin, Oliver; Martin, Etienne; Zetterwall, Tommy; Walker, Tony

    2014-01-01

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8 th technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  15. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  16. Qualification of contractor/consultant instructors

    International Nuclear Information System (INIS)

    Hanson, H.D.

    1985-01-01

    Following a brief discussion of the role of consultant instructors in Public Service Electric and Gas Company's training organization, the qualification process is presented. Consultant instructors are provided with information regarding supervision of the trainees and the instructional process and procedures required. Each individual must have his or her instructional capability, supervisory skills and technical competence verified and documented prior to conducting training independently. Concluding comments describe the overall satisfactory experience with this program

  17. Data qualification summary for 1985 L-Area AC Flow Tests

    International Nuclear Information System (INIS)

    Edwards, T.B.; Eghbali, D.A.; Liebmann, M.L.; Shine, E.P.

    1992-03-01

    The 1985 L-Area AC Flow Tests were conducted to provide an extended data base for upgrading the reactor system models employed in predicting normal process water flows. This report summarizes the results of the recently completed, formal, technical review of the data from the 1985 L-Area AC Flow Tests as detailed in document SCS-CMAS-910045. The purpose of that review was to provide corroborating technical information as to the quality (fitness for use) of these experimental data. Reference [1] required three volumes to fully document the results of that Data Qualification process. This report has been prepared to provide the important conclusions from that process in a manageable and understandable format. Consult reference [1] if any additional information or detail is needed. This report provides highlights from that study: an overview of the tests and data, a description of the instrumentation used, an explanation of the data qualification methods employed to review the data, and the important conclusions reached from the study. Reference 1: Edwards, T.B., D.A. Eghbali, M.L. Liebmann, and E.P. Shine, open-quotes Data Qualification for 1985 L-Area AC Flow Tests,close quotes SCS-CMAS-910045, December 31, 1991

  18. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  19. Intra and Inter-IOM Ccommunications Summary Document

    CERN Document Server

    Ambrosini, G; Cetin, S A; Conka, T; Fernandes, A; Francis, D; Joos, M; Lehmann, G; Mailov, A; Mapelli, L; Mornacchi, Giuseppe; Niculescu, M; Nurdan, K; Petersen, J; Spiwoks, R; Tremblet, L J; Ünel, G

    1999-01-01

    This document summarises the work performed, within the context of the DAQ-Unit of the DataFlow system in ATLAS DAQ/EF prototype -1 on intra and inter-Input/Output Module (IOM) message passing. This document fulfils the ATLAS DAQ/EF prototype -1 milestone of February 99.

  20. Status report on preparation of IAEA guidelines for qualification of research reactor fuels

    International Nuclear Information System (INIS)

    Snelgrove, J.L.

    2007-01-01

    The International Atomic Energy Agency, through a consultancy, is preparing a document describing good practices for the qualification of research reactor fuel. The rationale for the preparation of the document and the document's organization and content are discussed. It is anticipated that the consultants will present a final draft to the IAEA by mid-December for editing and publication in 2008.

  1. Estimations on uranium silicide fuel prototypes for their irradiation and postirradiation

    International Nuclear Information System (INIS)

    Sbaffoni, Maria M.

    2000-01-01

    The 'Silicide' project includes the qualification of this type of research reactor fuel to be used i.e. in the Argentine RA-3 and to confirm CNEA's role as an international supplier. The present paper shows complementary basic information for P-04 prototype post-irradiation, which is already under way, and some parameter values related to the new P-06 prototype to be taken into account for planning its irradiation and post-irradiation. The reliability of these values has been evaluated through comparison with experimental results. The reported results contribute, also, to a parallel study on the nuclear data libraries used in calculations for this type of reactor. (author)

  2. Recent developments in methodology for dynamic qualification of nuclear plant equipment

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-01-01

    Dynamic qualification of nuclear plant electrical and mechanical equipment is performed basically under guidelines given in IEEE Standards 323 and 344, and a variety of NRC regulatory guides. Over the last fifteen years qualification methodology prescribed by these documents has changed significantly as interpretations, equipment capability, and imagination of the qualification engineers have progressed. This progress has been sparked by concurrent NRC and industry sponsored research programs that have identified anomalies and developed new methodologies for resolving them. Revisions of the standards have only resulted after a lengthy debate of all such new information and subsequent judgment of its validity. The purpose of this paper is to review a variety of procedural improvements and developments in qualification methodology that are under current consideration as revisions to the standards. Many of the improvements and developments have resulted from recent research programs. All are very likely to appear in one type of standard or another in the near future

  3. TOUGH2 software qualification

    Energy Technology Data Exchange (ETDEWEB)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM ({open_quotes}MULti-KOMponent{close_quotes}) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2.

  4. TOUGH2 software qualification

    International Nuclear Information System (INIS)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM (open-quotes MULti-KOMponentclose quotes) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2

  5. Majorana Thermosyphon Prototype Experimental Results

    International Nuclear Information System (INIS)

    Fast, James E.; Reid, Douglas J.; Aguayo Navarrete, Estanislao

    2010-01-01

    The Majorana demonstrator will operate at liquid Nitrogen temperatures to ensure optimal spectrometric performance of its High Purity Germanium (HPGe) detector modules. In order to transfer the heat load of the detector module, the Majorana demonstrator requires a cooling system that will maintain a stable liquid nitrogen temperature. This cooling system is required to transport the heat from the detector chamber outside the shield. One approach is to use the two phase liquid-gas equilibrium to ensure constant temperature. This cooling technique is used in a thermosyphon. The thermosyphon can be designed so the vaporization/condensing process transfers heat through the shield while maintaining a stable operating temperature. A prototype of such system has been built at PNNL. This document presents the experimental results of the prototype and evaluates the heat transfer performance of the system. The cool down time, temperature gradient in the thermosyphon, and heat transfer analysis are studied in this document with different heat load applied to the prototype.

  6. QUALIFICATIONS FRAMEWORK DEVELOPMENT AND QUALIFICATIONS RATING IN THE LAND MANAGEMENT SPHERE

    Directory of Open Access Journals (Sweden)

    A. A. Myrasheva

    2014-01-01

    Full Text Available The aim of the research is to observe the existing approaches to qualifications framework development in the sphere of land management, cadastres and real estate management, as well as the qualifications framework adaptation to European system. The relevance of the issue is related to the specific professional and institutional problems facing Russian educational establishments engaged in personnel training in the given sphere. The authors demonstrate the qualifications framework development in the land management sector regarding it as a key mechanism of educational mobility and the router for knowledge acquisition and updates. The qualifications framework is referred to as a systematic and structured description of recognized qualifications. The accepted worldwide methodology of organizing the educational process and quality control system is given. The emphasis is on the need to comply the qualifications framework with the Russian State Educational Standards.

  7. Inspector qualification guidelines

    International Nuclear Information System (INIS)

    Batty, A.C.; Van Binnebeek, J.J.; Ericsson, P.O.; Fisher, J.C.; Geiger, P.; Grandame, M.; Grimes, B.K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-01

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied

  8. Inspector qualification guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Batty, A. C.; Van Binnebeek, J. J.; Ericsson, P. O.; Fisher, J. C.; Geiger, P.; Grandame, M.; Grimes, B. K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-15

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied.

  9. Data Qualification Report For DTN: MO0012RIB00065.002, Parameter Values For Transfer Coefficients

    International Nuclear Information System (INIS)

    C.H. Tung

    2001-01-01

    A data-qualification evaluation was conducted on Reference Information Base (RIB) data set MOO0 12RIB00065.002, ''Parameter Values for Transfer Coefficients''. The corroborating data method was used to evaluate the data. This method was selected because it closely matches the literature-review method followed to select parameter values. Five criteria were considered when the corroborating method was used: adequacy of the corroborative literature, sufficiency of value-selection criteria, implementation of the selection criteria, documentation of the process, and whether the analysis was conducted in accordance with applicable quality assurance (QA) procedures. Three criteria were used when a literature review was not conducted: appropriate logic used to select parameters, documentation of the process, and whether the analysis was conducted in accordance with applicable QA procedures. The RIB data item, the associated Analysis and Model Report (AMR), the corroborative literature, and the results of an audit revision O/ICN--0 of the AMR were examined. All calculations and the selection process for all values were repeated and confirmed. The qualification team concluded: (1) A sufficient quantity of corroborative literature was reviewed and no additional literature was identified that should have been considered. (2) The selection criteria were sufficient and resulted in valid parameter values. (3) The process was well defined, adequately documented in the AMR, and correctly followed. (4) The analysis was developed in accordance with applicable QA procedures. No negative findings were documented that resulted in questions about the quality of the data. The qualification team therefore recommends that the qualification status of RIB data set MO0012RIB00065.002 be changed to qualified

  10. Qualification criteria verification for aisi-4340 steel suspension lug

    International Nuclear Information System (INIS)

    Riaz, M.A.; Alam, M.

    2005-01-01

    All external loads carried underneath an aircraft are mounted onto it through mechanism generally known as suspension system. The externally mounted attachments like bombs, missiles and fuel tanks etc. experience enormous aerodynamic and inertial forces in the flights. These forces are transferred to the interface point of suspension system, known as 'Suspension Lug'. Thus lugs are considered critical component and have extremely stringent qualification criteria standards used in the aviation industry in USA, Europe, Russia, etc. Different standards prevail in different parts of the world about qualification and testing of these lugs. As Pakistan is entering into aviation industry, therefore there is a need to fulfill the requirements of these standards, to suit Pakistani environment. The suspension lug under study is 2000 Ibs. load class made from AISI-4340 Steel having good mechanical properties as per required standard. The manufacturing processes included forging, machining and vacuum heat treatment. The prototypes of suspension lugs were manufactured in the local industry and subjected to the required mechanical tests such as tensile testing at 5 to 35 degree angles. Impact testing at cryogenic temperatures of -50 to -70 degree C, and breaking load testing were performed. The acceptable results were obtained and mechanical testing for qualification of lugs was finalized and standardized. The options were compared with practical viability, utilization of product and cost effectiveness. (author)

  11. High Temperature Materials Interim Data Qualification Report FY 2011

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2011-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim fiscal year (FY) 2011 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under the Nuclear Quality Assurance (NQA)-1 guidelines and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from seven test series within the High Temperature Materials data stream have been entered into the NDMAS vault, including tensile tests, creep tests, and cyclic tests. Of the 5,603,682 records currently in the vault, 4,480,444 have been capture passed, and capture testing is in process for the remaining 1,123,238.

  12. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  13. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  14. Hybrid Qualifications

    DEFF Research Database (Denmark)

    Against the background of increasing qualification needs there is a growing awareness of the challenge to widen participation in processes of skill formation and competence development. At the same time, the issue of permeability between vocational education and training (VET) and general education...... has turned out as a major focus of European education and training policies and certainly is a crucial principle underlying the European Qualifications Framework (EQF). In this context, «hybrid qualifications» (HQ) may be seen as an interesting approach to tackle these challenges as they serve «two...

  15. Qualification of RETRAN for simulator applications

    International Nuclear Information System (INIS)

    Harrison, J.F.

    1988-01-01

    The use of full-scope control room replica simulators increased substantially following the accident at Three Mile Island Unit 2. The technical capability required to represent severe events has been included, in varying degrees, in most simulators purchased since the TMI-2 accident. The ability of the instructor to create a large variety of combinations of malfunctions has also greatly expanded. The nuclear industry has developed a standard which establishes the minimum functional requirements for full-scope nuclear control room simulators used for operator training. This standard, ANSI/ANS-3.5, was first issued in 1981 and was reissued in 1985. A method for performing simulator qualification with best estimate analytical data has been proposed in EPRI NP-4243, Analytic Simulator Qualification Methodology. The idea presented there is to choose a set of transients which drive the simulator into all the system conditions (dynamic states) likely to be encountered during operator training. The key observable parameters for each state are compared to analyses performed with the best estimate analytical model The closeness of the comparison determines the fidelity of the simulator. The approach described in EPRI NP-4243 has been adapted for evaluating RETRAN's capability for use in simulator qualification. RETRAN analyses which compare the RETRAN results to plant or test facility data are evaluated with respect to the simulator test matrix documented in EPRI NP-4243

  16. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Hassan, M.; Tanaka, T.J.

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

  17. Technical basis for environmental qualification of microprocessor-based safety-related equipment in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Korsah, K.; Wood, R.T. [Oak Ridge National Lab., TN (United States); Hassan, M. [Brookhaven National Lab., Upton, NY (United States); Tanaka, T.J. [Sandia National Labs., Albuquerque, NM (United States)

    1998-01-01

    This document presents the results of studies sponsored by the Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. The studies were conducted by Oak Ridge National Laboratory (ORNL), Sandia National Laboratories (SNL), and Brookhaven National Laboratory (BNL). The studies address the following: (1) adequacy of the present test methods for qualification of digital I and C systems; (2) preferred (i.e., Regulatory Guide-endorsed) standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging for equipment to be located in a benign environment; and (5) determination of an appropriate approach for addressing the impact of smoke in digital equipment qualification programs. Significant findings from the studies form the technical basis for a recommended approach to the environmental qualification of microprocessor-based safety-related equipment in nuclear power plants.

  18. Implementation and Qualifications Lessons Learned for Space Flight Photonic Components

    Science.gov (United States)

    Ott, Melanie N.

    2010-01-01

    This slide presentation reviews the process for implementation and qualification of space flight photonic components. It discusses the causes for most common anomalies for the space flight components, design compatibility, a specific failure analysis of optical fiber that occurred in a cable in 1999-2000, and another ExPCA connector anomaly involving pins that broke off. It reviews issues around material selection, quality processes and documentation, and current projects that the Photonics group is involved in. The importance of good documentation is stressed.

  19. Regulatory Guide 1.131: Qualification tests of electric cables, field splices, and connections for light-water-cooled nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Criterion III, ''Design Control,'' of Appendix B, ''Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plant,'' to 10 CFR Part 50, ''Licensing of Production and Utilization Facilities,'' requires that, where a test program is used to verify the adequacy of a specific design feature, it include suitable qualification testing of a prototype unit under the most adverse design conditions. This regulatory guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to qualification testing of electric cables, field splices, and connections for service in light-water-cooled nuclear power plants to ensure that the cables, field splices, and connections can perform their safety-related functions. The fire test provisions of this guide do not apply to qualification for an installed configuration

  20. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    Science.gov (United States)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  1. Courthouse Prototype Building

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2018-02-01

    As part of DOE's support of ANSI/ASHRAE/IES Standard 90.1 and IECC, researchers at Pacific Northwest National Laboratory (PNNL) apply a suite of prototype buildings covering 80% of the commercial building floor area in the U.S. for new construction. Efforts have started on expanding the prototype building suite to cover 90% of the commercial building floor area in the U.S., by developing prototype models for additional building types including place of worship, public order and safety, public assembly. Courthouse is courthouse is a sub-category under the “Public Order and Safety" building type category; other sub-categories include police station, fire station, and jail, reformatory or penitentiary.ORNL used building design guides, databases, and documented courthouse projects, supplemented by personal communication with courthouse facility planning and design experts, to systematically conduct research on the courthouse building and system characteristics. This report documents the research conducted for the courthouse building type and proposes building and system characteristics for developing a prototype building energy model to be included in the Commercial Building Prototype Model suite. According to the 2012 CBECS, courthouses occupy a total of 436 million sqft of floor space or 0.5% of the total floor space in all commercial buildings in the US, next to fast food (0.35%), grocery store or food market (0.88%), and restaurant or cafeteria (1.2%) building types currently included in the Commercial Prototype Building Model suite. Considering aggregated average, courthouse falls among the larger with a mean floor area of 69,400 sqft smaller fuel consumption intensity building types and an average of 94.7 kBtu/sqft compared to 77.8 kBtu/sqft for office and 80 kBtu/sqft for all commercial buildings.Courthouses range in size from 1000 sqft to over a million square foot building gross square feet and 1 courtroom to over 100 courtrooms. Small courthouses

  2. Prototype development and demonstration for integrated dynamic transit operations.

    Science.gov (United States)

    2016-01-01

    This document serves as the Final Report specific to the Integrated Dynamic Transit Operations (IDTO) Prototype Development and Deployment Project, hereafter referred to as IDTO Prototype Deployment or IDTO PD project. This project was performed unde...

  3. Evaluation of environmental qualification period for Conax electrical penetration assemblies. Final report

    International Nuclear Information System (INIS)

    Doroshuk, B.; Hager, M.; Brown, R.

    1995-05-01

    This report evaluates the environmental qualification period of Conax electrical penetration assemblies (EPAs) for extension from forty (40) years to sixty (60) years. The evaluation was performed based on a review of Conax EPAs supplied to Baltimore Gas ampersand Electric's (BGE) Calvert Cliffs Nuclear Power Plant Units 1 and 2. The report has been prepared so that it may be of use to any utility involved in the extension of the environmental qualification period for Conax EPAs installed in their plant(s). The report includes a section on the strategy which was developed for the effort to extend the qualified lives of the Conax EPAs. A review of documentation and plant conditions specific to BGE is included in the report to demonstrate the methodology. The documentation included qualification testing performed by Conax of the materials of construction of the EPA models. The plant conditions reviewed included both normal and accident environments, both of which are specific to Calvert Cliffs Nuclear Power Plant Units 1 and 2. This report can be used as a guide in the evaluation of similar installations of Conax electrical penetration assemblies in other nuclear power plants by applying the methodologies used herein in conjunction with the plant specific test reports, materials, and conditions

  4. Report on the Regulators Experience of NDT Qualification for In-service Inspection of Nuclear Components

    International Nuclear Information System (INIS)

    2003-08-01

    In November 1992, the Nuclear Regulators Working Group (NRWG) decided to set up a task force on qualification of non-destructive testing (NDT) systems for pre and in-service inspection of light water reactors. The first task was to agree on the philosophy and principles governing the qualification of techniques, equipment, software, procedures, and personnel for NDT to be used for the inspection of structural components that are important to safety in nuclear power plants; and to establish a common view on essential aspects of NDT qualifications. The first task, which also included a comparison of the common views of the European regulators with the qualification approach outlined in Appendix VIII to Section XI of the ASME Code, was completed in 1996. The result was published in the report ''Common position of European regulators on qualification of NDT systems for pre- and in-service inspection of light water reactor components''2. In parallel, the European nuclear power industries had set up a working group, the European Network for Inspection Qualification (ENIQ), to discuss and agree on how to perform inspection qualifications. In 1995, ENIQ finalized its first version of ''European methodology for qualification of non-destructive tests''3. A second version 4 was then published in 1997. This second version is in relatively close agreement with the principles given in the regulators common position document. With these two basic documents, a platform was established for the further development of qualification strategies in the European countries. The second task of the NRWG Task Force was to follow and evaluate the first ENIQ pilot study from a regulatory point of view. The objective of this pilot study was to explore ways of how to apply the European qualification methodology and to test its feasibility. The pilot study commenced late 1996 and was planned to be finalized a year later. Depending on unforeseen difficulties, the pilot study has been delayed

  5. Australian Qualifications Framework Lower-Level Qualifications: Pathways to Where for Young People?

    Science.gov (United States)

    Stanwick, John

    2005-01-01

    This study investigates where certificate I and II qualifications lead young people aged 15-24 years in terms of employment and further study. A prime motivation for young people undertaking these qualifications is to facilitate transition into the labour market. These qualifications are aimed at developing basic vocational skills or preparatory…

  6. Training for the qualification and competence of nuclear power plant personnel. Working material

    International Nuclear Information System (INIS)

    1993-01-01

    This document contains summaries of the presentations prepared for the IAEA Review Meeting ''Training for the Qualification and Competence of Nuclear Power Plant Personnel''. The individual contributors have been indexed separately for the database. Refs, figs and tabs

  7. TEACHERS’ EDUCATIONAL QUALIFICATION, RANK LEVEL, WORKING DURATION, AGE, WORK MOTIVATION AND WORK EFFECTIVENESS

    Directory of Open Access Journals (Sweden)

    Bambang Budi Wiyono

    2016-02-01

    Full Text Available Teachers’ Educational Qualification, Rank Level, Working Duration, Age, Working Mo­tivation, and Working Effectiveness The study investigated the effects of educational qualification, rank level, working duration and age on the elementary school teachers’ working motivation and working ef­fectiveness. The sample of the study consisted of 438 elementary school teachers in Malang which were selected through cluster sampling technique. The study was conducted using explanatory design in the form of causal model. The data were collected using questionnaire and documentation, and were analyzed descrip­tively employing structural equation technique. The study revealed that that the effect of the educational qualification, rank level, working duration and age on teachers’ working motivation and working effec­tiveness, both directly and indirectly, was not significant.

  8. Structural qualification of the multifunctional instrument tree for installation in double-shell and 100-series single-shell tanks

    International Nuclear Information System (INIS)

    Strohlow, J.P.

    1995-12-01

    This document provides the technical basis and methodology for qualifying the multifunctional instrument tree (MIT) structure for installation in double-shell and 100-series single-shell tanks. Structural qualification for MIT installations in specific tanks are also contained in this document

  9. Let Documents Talk to Each Other: A Computer Model for Connection of Short Documents.

    Science.gov (United States)

    Chen, Z.

    1993-01-01

    Discusses the integration of scientific texts through the connection of documents and describes a computer model that can connect short documents. Information retrieval and artificial intelligence are discussed; a prototype system of the model is explained; and the model is compared to other computer models. (17 references) (LRW)

  10. Nuclear safety review for qualification of class 1E motor inside containment for nuclear power stations

    International Nuclear Information System (INIS)

    Li Shixin; Wu Qi; Zhang Yunbo; Wu Caixia

    2013-01-01

    In nuclear power plants with pressurized water reactors, the review for class 1E motor inside containment qualification process and documents is an important aspect of nuclear safety equipment review, and the reviewers should make evaluations for the qualification test results in terms of the compliance with standard and regulation, and the consistency with inside containment environment. Firstly, this paper introduces the qualification test of class 1E motor inside containment for nuclear power generating stations, such as aging test and design-basis-event test. Second, there is a discussion about typical problems of review. At last, comparison of IEEE334 with RCC-E is conducted and explored. (authors)

  11. An analysis of the qualification criteria for small radioactive material shipping packages

    International Nuclear Information System (INIS)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described

  12. An analysis of the qualification criteria for small radioactive material shipping packages

    Energy Technology Data Exchange (ETDEWEB)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described.

  13. Methods for qualification of highly reliable software - international procedure

    International Nuclear Information System (INIS)

    Kersken, M.

    1997-01-01

    Despite the advantages of computer-assisted safety technology, there still is some uneasyness to be observed with respect to the novel processes, resulting from absence of a body of generally accepted and uncontentious qualification guides (regulatory provisions, standards) for safety evaluation of the computer codes applied. Warranty of adequate protection of the population, operators or plant components is an essential aspect in this context, too - as it is in general with reliability and risk assessment of novel technology - so that, due to appropriate legislation still missing, there currently is a licensing risk involved in the introduction of digital safety systems. Nevertheless, there is some extent of agreement within the international community and utility operators about what standards and measures should be applied for qualification of software of relevance to plant safety. The standard IEC 880/IEC 86/ in particular, in its original version, or national documents based on this standard, are applied in all countries using or planning to install those systems. A novel supplement to this standard, document /IEC 96/, is in the process of finalization and defines the requirements to be met by modern methods of software engineering. (orig./DG) [de

  14. Hoisting and rigging manual: Uncontrolled document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-05-01

    This document is a draft copy of a Hoisting and Rigging Manual for the Department of Energy. The manual is divided into ten chapters. The chapter titles follow: terminology and definitions; operator training and qualification; overhead and gantry cranes; mobile cranes; forklift trucks; hoists; hooks; wire rope, slings, and rigging accessories; construction hoisting and rigging equipment requirements; references.

  15. Test-qualification experience with non-destructive material analysis system performed at Paks Nuclear Power Plant and its usage in non-nuclear fields

    International Nuclear Information System (INIS)

    Somogyi, Gy.; Szabo, D.

    2003-01-01

    The need for qualification of non-destructive material analysis has been recognised in controlling nuclear energy production process. This test-qualification has been performed as first of its kind after the task has been assigned by the National Nuclear Energy Agency. The input documents for the test were. Technical Specification, Analysis Technology, Technical Justification. Test-qualification has been performed with real form control bodies developed by the Rez Nuclear Research Institute, in which the planned defects has been produced by spark-chipping. The qualification procedure has been summarized in a Qualification Folder and given to the national agency to issue a qualification certificate. The procedure might be interesting mostly for companies delivering nuclear power plant assemblies. Similar needs are formulated in standards relative to the qualification of non-nuclear material testing methods (MSZ EN 17025 and EU). (Gy.M.)

  16. Qualifications of an Ideal Teacher According to Social Studies Preservice Teachers

    Science.gov (United States)

    Gencturk, Ebru; Akbas, Yavuz; Kaymakci, Selahattin

    2012-01-01

    In this study, the question of what kind of qualifications an ideal social studies teacher has tried to be investigated. For this purpose, freshman social studies preservice teachers' perceptions about the concept of "ideal teacher" were explored. This study was designed with document analysis, one of the methods of qualitative approach.…

  17. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

      When, in a competitive sphere, people are selected on the basis of qualifications only, their chances of acquiring positions of advantage may seem to depend entirely upon their abilities, not discriminatory bias. However, if reaction qualifications - i.e. characteristics which contribute...... to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... of merit. Specifically, it preserves symmetry between negative evaluations of antimeritocratic bases of selection and negative evaluations of qualifications rooted in comparable antimeritocratic reactions. So if employers should not select among applicants on the basis of their (the employers') racial...

  18. A uniform approach for on-site training and qualification of health physics technicians

    International Nuclear Information System (INIS)

    Till, J.E.

    1977-01-01

    Estimates show that in the U.S. approx. 75% of the health physics technicians received their training through courses offered by their employer. The quality and the extent of this training vary considerably among nuclear facilities. This paper describes a uniform approach for on-site training and qualification of health physics technicians applicable to all nuclear facilities. The program consists of four levels of qualification: Health Physics Technician Trainee, Technician I, Technician II and Senior Technician. The training is divided into modules that are composed of formal lectures, practical factors, experience, and a comprehensive examination. The minimum time required from hiring of inexperienced trainees to qualification as Senior Technicians is approx. 24 months. A qualification guide lists each step a technician must complete in the training program and provides documentation which facilitates audits by internal and external groups. Although items in the program would differ between facilities, the program provides specific titles for technicians, based on their training and experience, which would be applicable throughout the nuclear industry. (author)

  19. Qualification of NDE personnel in the nuclear industry

    International Nuclear Information System (INIS)

    Epps, T.N.

    1984-01-01

    There has been evidence of ineffective programs for certifying nondestructive examination (NDE) personnel who conduct periodic inservice examinations in nuclear power plants under ASME Section XI Code requirements. This was brought to the attention of a group from the electric utility industry, the Electric Power Research Institute (EPRI), some NDE consultants and representatives from the American Society of Mechanical Engineers (ASME) by the Nuclear Regulatory Commission (NRC) in a May, 1982 meeting in Bethesda, Maryland. One problem pointed out by the NRC was the lack of a clear definition of qualification requirements for certification of NDE personnel who conduct ASME Section XI Inservice Inspection work in nuclear power plants. The NRC requested that the nuclear industry resolve this problem by formulating definitive qualification requirements for personnel certification that could be made an industry requirement. In June, 1982 the EPRI NDE Subcommittee held a general meeting for utility representatives to discuss the results of the May, 1982 meeting to develop a plan for industry response to the issue. The consensus was that an Ad Hoc Committee of utility representatives be convened to develop a document outlining qualification requirements for vertification of NDE personnel. The Ad Hoc Committee was formally convened on September 29, 1982

  20. IEEE Standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 279-1979 and IEEE Std 308-1978, can be demonstrated by using the procedures provided in this Standard in accordance with IEEE Std 323-1974. Battery sizing, maintenance, capacity testing, installation, charging equipment and consideration of other types batteries are beyond the scope of this Standard

  1. Comparative Study of Laboratory-Scale and Prototypic Production-Scale Fuel Fabrication Processes and Product Characteristics

    International Nuclear Information System (INIS)

    Marshall, Douglas W.

    2014-01-01

    An objective of the High Temperature Gas Reactor fuel development and qualification program for the United States Department of Energy has been to qualify fuel fabricated in prototypic production-scale equipment. The quality and characteristics of the tristructural isotropic (TRISO) coatings on fuel kernels are influenced by the equipment scale and processing parameters. The standard deviations of some TRISO layer characteristics were diminished while others have become more significant in the larger processing equipment. The impact on statistical variability of the processes and the products, as equipment was scaled, are discussed. The prototypic production-scale processes produce test fuels meeting all fuel quality specifications. (author)

  2. Software qualification in safety applications

    International Nuclear Information System (INIS)

    Lawrence, J.D.

    2000-01-01

    The developers of safety-critical instrumentation and control systems must qualify the design of the components used, including the software in the embedded computer systems, in order to ensure that the component can be trusted to perform its safety function under the full range of operating conditions. There are well known ways to qualify analog systems using the facts that: (1) they are built from standard modules with known properties; (2) design documents are available and described in a well understood language; (3) the performance of the component is constrained by physics; and (4) physics models exist to predict the performance. These properties are not generally available for qualifying software, and one must fall back on extensive testing and qualification of the design process. Neither of these is completely satisfactory. The research reported here is exploring an alternative approach that is intended to permit qualification for an important subset of instrumentation software. The research goal is to determine if a combination of static analysis and limited testing can be used to qualify a class of simple, but practical, computer-based instrumentation components for safety application. These components are of roughly the complexity of a motion detector alarm controller. This goal is accomplished by identifying design constraints that enable meaningful analysis and testing. Once such design constraints are identified, digital systems can be designed to allow for analysis and testing, or existing systems may be tested for conformance to the design constraints as a first step in a qualification process. This will considerably reduce the cost and monetary risk involved in qualifying commercial components for safety-critical service

  3. SRNL Phase 1 Assessment Of The WAC/DQO And Unit Operations For The WTP Waste Qualification Program

    International Nuclear Information System (INIS)

    Peeler, D.; Adamson, D.; Bannochie, C.; Cozzi, A.; Eibling, R.; Hay, M.; Hansen, E.; Herman, D.; Martino, C.; Nash, C.; Pennebaker, F.; Poirier, M.; Reboul, S.; Stone, M.; Taylor-Pashow, K.; White, T.; Wilmarth, B.

    2012-01-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap identification

  4. SRNL PHASE 1 ASSESSMENT OF THE WAC/DQO AND UNIT OPERATIONS FOR THE WTP WASTE QUALIFICATION PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    Peeler, D.; Adamson, D.; Bannochie, C.; Cozzi, A.; Eibling, R.; Hay, M.; Hansen, E.; Herman, D.; Martino, C.; Nash, C.; Pennebaker, F.; Poirier, M.; Reboul, S.; Stone, M.; Taylor-Pashow, K.; White, T.; Wilmarth, B.

    2012-05-16

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is currently transitioning its emphasis from a design and construction phase toward start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements related to actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program to be implemented to support the WTP. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS), based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested the utilization of subject matter experts from SRNL to support a technology exchange to perform a review of the WTP waste qualification program, discuss the general qualification approach at SRS, and to identify critical lessons learned through the support of DWPF's sludge batch qualification efforts. As part of Phase 1, SRNL subject matter experts in critical technical and/or process areas reviewed specific WTP waste qualification information. The Phase 1 review was a collaborative, interactive, and iterative process between the two organizations. WTP provided specific analytical procedures, descriptions of equipment, and general documentation as baseline review material. SRNL subject matter experts reviewed the information and, as appropriate, requested follow-up information or clarification to specific areas of interest. This process resulted in multiple teleconferences with key technical contacts from both organizations resolving technical issues that lead to the results presented in this report. This report provides the results of SRNL's Phase 1 review of the WAC-DQO waste acceptance criteria and processability parameters, and the specific unit operations which are required to support WTP waste qualification efforts. The review resulted in SRNL providing concurrence, alternative methods, or gap

  5. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  6. ABOUT MODERN TECHNICAL GRAPHICS USING IN THE VIRTUAL PROTOTYPING

    Directory of Open Access Journals (Sweden)

    GHERGHINA George

    2008-07-01

    Full Text Available The paper presents aspects concerning the using of modern technical graphics elements in the virtual prototyping. The virtual prototyping is a process which uses a virtual prototype in place of physical prototype for the testing and the evaluation of specific features of designed product. The virtual prototype is created by computer such as it could assign the specific features as close as possible to the real conditions which permit its function simulation in the conditions for which is designed. The virtual prototyping permits the replacing of classical design process, although, and the elaboration of graphicalm documentation, which represent an important work volume – with CAD/CAM systems in the increased efficiency conditions.

  7. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  8. Mechanical properties used for the qualification of transport casks: Prototype development and extension to serial production

    International Nuclear Information System (INIS)

    Salzbrenner, R.; Crenshaw, T.B.; Sorenson, K.B.

    1991-01-01

    A thorough understanding of the mechanical behavior of material in a specific cask is required to properly analyze the structural response of the cask. An appropriate way to establish this understanding is through laboratory testing of cask material. The laboratory testing that was done to support the MOSAIK Drop Test Program is summarized as an example of how mechanical properties can be mapped for a prototype cask. The broad range behavior to be understood. This is necessary for the proper application of fracture mechanics, and focuses on fracture toughness as the inherent materials property which quantifies the fracture resistance of a material. The understanding established by a mechanics to a particular prototype, behavior of a prototype must be correctly associated with parameters which can be measured on production casks. Since the production casks cannot be destructively tested, measurements are commonly made on sub-size specimens. This may prevent direct measurement of valid design properties. An additional database may then be required to establish the correlation between sub-size specimen measurements and valid design properties. This is illustrated by outlining the additional testing which would be necessary to allow the successful verification of the MOSAIK Drop Test Program to be extended from the prototype to serially produced casks

  9. REGULATION OF NATIONAL QUALIFICATIONS SYSTEMS

    Directory of Open Access Journals (Sweden)

    Anna A. Muravyeva

    2014-01-01

    Full Text Available The paper looks into the diverse aspects of qualifications system regulation, designed for balancing the supply and demand in the labor and educational service markets. Both the objects and mechanisms of such regulation are described. Special attention is given to institutions, involved in regulation of qualifications, and their jurisdiction. Another emphasis is on the industry-related regulation of qualifications which proved to be effective both on the national and European level. Such structures were first established on the national levels to regulate the qualifications and ensure their comparability and compatibility, given the economic globalization and growing labor and academic mobility. The author points out the role of the ministries of education and labor in maintaining a steady qualifications system, and outlines the positive experience of Great Britain using the industry councils for continuing development of qualifications system.

  10. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 1 of Volume IV, discusses: Process overview functional descriptions; Control system descriptions; Support system descriptions; Maintenance system descriptions; and Process equipment descriptions

  11. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 4 of Volume IV, discusses: Off-normal operating and recovery procedures; Emergency response procedures; Troubleshooting procedures; and Preventive maintenance procedures

  12. DATA QUALIFICATION REPORT: MAJOR ION AND PH DATA FOR USE ON THE YUCCA MOUNTAIN PROJECT

    International Nuclear Information System (INIS)

    C. WILSON; D.M. JENKINS; T. STEINBORN; R. WEMHEUER

    2000-01-01

    This data qualification report uses technical assessment and corroborating data methods according to Attachment 2 of AP-SIII.2Q, Rev. 0, ICN 2, ''Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data'', to qualify major ion and pH data. This report was prepared in accordance with Data Qualification Plan TDP-NBS-GS-00003 1, Revision 2. Additional reports will be prepared to address isotopic and precipitation-related data. Most of the data considered in this report were acquired and developed by the U.S. Geological Survey (USGS). The data qualification team considers the sampling and analytical protocols employed by the USGS over the time period of data acquisition to be state-of-the-art. The sample collection methodologies have evolved with no significant change that could affect the quality of the data considered in this report into the currently used Hydrologic Procedures that support the Yucca Mountain Project-approved USGS Quality Assurance Program Plan. Consequently, for USGS data, the data collection methods, documentation, and results are reasonable and appropriate in view of standard practice at the time the data were collected. A small number of data sets were collected by organizations other than the USGS and were reviewed along with the other major ion and pH data using corroborating data methods. Hydrochemical studies reviewed in this qualification report indicate that the extent and quality of corroborating data are sufficient to support qualification of both USGS and non-USGS major ion and pH data for generalized hydrochemical studies. The corroborating data included other major ion and pH data, isotope data, and independent hydrological data. Additionally, the analytical adequacy of the major ion data was supported by a study of anion-cation charge balances. Charge balance errors for USGS and non-USGS data were under 10% and acceptable for all data. This qualification report addresses the specific major ion data sets

  13. Training and qualification program for nuclear criticality safety technical staff. Revision 1

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1997-01-01

    A training and qualification program for nuclear criticality safety technical staff personnel has been developed and implemented. All personnel who are to perform nuclear criticality safety technical work are required to participate in the program. The program includes both general nuclear criticality safety and plant specific knowledge components. Advantage can be taken of previous experience for that knowledge which is portable such as performance of computer calculations. Candidates step through a structured process which exposes them to basic background information, general plant information, and plant specific information which they need to safely and competently perform their jobs. Extensive documentation is generated to demonstrate that candidates have met the standards established for qualification

  14. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3

  15. Building Skills and Qualifications among SME Employees. Leonardo da Vinci Good Practices Series.

    Science.gov (United States)

    Commission of the European Communities, Brussels (Belgium). Directorate-General for Education and Culture.

    This document profiles 10 European programs that exemplify good practice in building skills and qualifications among employees of small and medium enterprises (SMEs). The programs profiled are as follows: (1) TRICTSME (a program providing World Wide Web-based information and communication technologies training for SMEs in manufacturing); (2)…

  16. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  17. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2

    International Nuclear Information System (INIS)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A.; Naranjo U, J. L.

    2013-10-01

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  18. Developments in mechanical ultrasonic inspection and qualification of NDE

    International Nuclear Information System (INIS)

    Kauppinen, P.; Pitkaenen, J.; Kuusinen, P.

    2001-01-01

    Reliability of non-destructive testing results has a direct influence on structural integrity assessment and safety of the inspected structures e.g. NPP primary circuit pressure boundaries. Advanced technology together with highly skilled and experienced personnel is required. One of the current trends is automation. Mechanised equipment can replace tedious manual work in positioning and moving of the transducers. Large areas can be scanned, analysed and numerically documented for direct comparison of eventual later repeated inspections. Another major trend is qualification, which aims to ensure that the inspection results are correct and fit the purpose. The suitability and proper operation of equipment, methods and personnel i.e. the whole chain shall be proven. This presentation summarises the advances in automation and qualification of non-destructive inspection during the second project year, Monitoring of material degradation was included in the studied topics and will also be shortly described. (author)

  19. Nuclear security personnel for power plants. Content and review procedures for a security training and qualification program

    International Nuclear Information System (INIS)

    1978-06-01

    The applicant and licensee training and qualification plans will outline the process by which guard, watchman, armed response persons and other members of the security organization will be selected, trained, equipped and qualified. This plan should contain: (1) job descriptions for all security positions; (2) duties defined for all positions; (3) critical tasks defined for all duties; (4) skills, knowledge and abilities defined for all critical tasks; (5) performance objectives stated for all critical tasks; and (6) training and qualification plans to train and test to appropriate performance objectives. The document gives guidance on the preparation of this training and qualification plan and contains three parts: (1) an introduction to and brief explanation of job analysis and performance objectives; (2) a statement of the information that should be submitted in response to the requirements and the NRR review procedures; and (3) a sample qualification submittal

  20. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  1. Inspection qualification as a tool to risk based ET ISI of VVER type SG tubes

    International Nuclear Information System (INIS)

    Horacek, L.

    2002-01-01

    A Pilot study on Eddy current inspection qualification of VVER 440 steam generator tubes, discussed in this paper, followed the ENIQ methodology principles and covered briefly the assumed scope of ET qualification, relevant elaborated qualification documents, known ISI limitations and a review of input information on component and defects determined for Eddy current inspection qualification of VVER 440 steam generator tubes. The information includes the fabrication of the test blocks with SG tube segments provided by intended defect simulations of realistic SCC type and basic data on the realistic SCC type defects manufacturing technology. Lessons learned from the development of manufacturing technology of SSC type of defects, regional blind tests, elaboration of the preliminary technical justification for Eddy current automated inspections, potential optimisation of inspection procedures, laboratory and practical open trials are summarised in the paper. The results of the Pilot study also especially in relation to POD curve being determined seem to be useful for practical operational ISI programme and Risk informed ISI decisions and the establishment of plugging criteria of VVER 440 and VVER 1000 type steam generator tubes. (orig.)

  2. Pilot production system cost/benefit analysis: Digital document storage project

    Science.gov (United States)

    1989-01-01

    The Digital Document Storage (DDS)/Pilot Production System (PPS) will provide cost effective electronic document storage, retrieval, hard copy reproduction, and remote access for users of NASA Technical Reports. The DDS/PPS will result in major benefits, such as improved document reproduction quality within a shorter time frame than is currently possible. In addition, the DDS/PPS will provide an important strategic value through the construction of a digital document archive. It is highly recommended that NASA proceed with the DDS Prototype System and a rapid prototyping development methodology in order to validate recent working assumptions upon which the success of the DDS/PPS is dependent.

  3. Environmental Qualification Program for NPP Krsko

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Spalj, S.; Colovic, G.

    1998-01-01

    The functionality the equipment important to safety is deteriorated during its service due to ageing and harsh environment conditions. Since the environment is a potential for common cause failures, the purpose of Environmental Qualification (EQ) is to demonstrate the capability of safety-related equipment to perform its safety function in aged conditions and under extreme conditions after design bases event (DBE). EQ is one of the steps in licensing process according to US regulatory documents and standards (10CFR50.49, RG 1.89, NUREG-0588, IEEE-323). This paper presents the efforts in establishing the EQ program in the Krsko nuclear power plant. (author)

  4. Qualification of PHT piping of Indian 500 MW PHWR for LBB, using R-6 method

    International Nuclear Information System (INIS)

    Rastogi, Rohit; Bhasin, V.; Kushwaha, H.S.

    1997-01-01

    This document discusses the qualification of straight pipe portion of the primary heat transport (PHT) piping of Indian 500 MWe pressurised heavy water reactor (PHWR) for leak before break (LBB). The evaluation is done using R-6 [1] method. The results presented here are: the safety margins which exist on straight pipe components of main PHT piping of 500 MWe, under leakage size crack (LSC) and design basis accident loads; the sensitivity of safety margins with respect to different analysis parameters and the qualification of PHT piping for LBB based on criterion given by NUREG-1061 [2] and TECDOC-774 [3]. (author)

  5. Large Hospital 50% Energy Savings: Technical Support Document

    Energy Technology Data Exchange (ETDEWEB)

    Bonnema, E.; Studer, D.; Parker, A.; Pless, S.; Torcellini, P.

    2010-09-01

    This Technical Support Document documents the technical analysis and design guidance for large hospitals to achieve whole-building energy savings of at least 50% over ANSI/ASHRAE/IESNA Standard 90.1-2004 and represents a step toward determining how to provide design guidance for aggressive energy savings targets. This report documents the modeling methods used to demonstrate that the design recommendations meet or exceed the 50% goal. EnergyPlus was used to model the predicted energy performance of the baseline and low-energy buildings to verify that 50% energy savings are achievable. Percent energy savings are based on a nominal minimally code-compliant building and whole-building, net site energy use intensity. The report defines architectural-program characteristics for typical large hospitals, thereby defining a prototype model; creates baseline energy models for each climate zone that are elaborations of the prototype models and are minimally compliant with Standard 90.1-2004; creates a list of energy design measures that can be applied to the prototype model to create low-energy models; uses industry feedback to strengthen inputs for baseline energy models and energy design measures; and simulates low-energy models for each climate zone to show that when the energy design measures are applied to the prototype model, 50% energy savings (or more) are achieved.

  6. Qualification of a production and packaging hot cell for sodium pertechnetate Tc 99m

    International Nuclear Information System (INIS)

    Cavero, Luis; Robles, Anita; Miranda, Jesus; Martinez, Ramos; Paragulla, Wilson; Moore, Mariel; Herrera, Jorge; Ocana, Elias; Portilla, Arturo; Otero, Manuel; Novoa, Carlos; Koga, Roberto

    2014-01-01

    It was designed and implemented a protocol for a hot cell of production and packaging of sodium pertechnetate Tc 99m, in a two-step process: installation qualification (IQ) and operation qualification (OQ). In the IQ design specifications and user requirements and associated equipment and materials by traceable documentation was verified. In the OQ scheduled for operation and control sequences it was verified plus operational tests recommended by the World Health Organization (WHO) and ISO 14644-1 and 3 were performed to clean areas. The results showed that the hot cell complies with the classification for Grades C and A for the preparation and packaging of Tc 99m. (authors).

  7. Literature review of environmental qualification of safety-related electric cables: Literature analysis and appendices. Volume 2

    International Nuclear Information System (INIS)

    Lofaro, R.; Bowerman, B.; Carbonaro, J.

    1996-04-01

    In support of the US NRC Environmental Qualification (EQ) Research Program, a literature review was performed to identify past relevant work that could be used to help fully or partially resolve issues of interest related to the qualification of low-voltage electric cable. A summary of the literature reviewed is documented in Volume 1 of this report. In this, Volume 2 of the report, dossiers are presented which document the issues selected for investigation in this program, along with recommendations for future work to resolve the issues, when necessary. The dossiers are based on an analysis of the literature reviewed, as well as expert opinions. This analysis includes a critical review of the information available from past and ongoing work in thirteen specific areas related to EQ. The analysis for each area focuses on one or more questions which must be answered to consider a particular issue resolved. Results of the analysis are presented, along with recommendations for future work. The analysis is documented in the form of a dossier for each of the areas analyzed

  8. WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Smith, T. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Pareizs, J. M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-06-01

    The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combined 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These

  9. Process and equipment qualification of the ceramic and metal waste forms for spent fuel treatment

    International Nuclear Information System (INIS)

    Marsden, Ken; Knight, Collin; Bateman, Kenneth; Westphal, Brian; Lind, Paul

    2005-01-01

    The electrometallurgical process for treating sodium-bonded spent metallic fuel at the Materials and Fuels Complex of the Idaho National Laboratory separates actinides and partitions fission products into two waste forms. The first is the metal waste form, which is primarily composed of stainless steel from the fuel cladding. This stainless steel is alloyed with 15w% zirconium to produce a very corrosion-resistant metal which binds noble metal fission products and residual actinides. The second is the ceramic waste form which stabilizes fission product-loaded chloride salts in a sodalite and glass composite. These two waste forms will be packaged together for disposal at the Yucca Mountain repository. Two production-scale metal waste furnaces have been constructed. The first is in a large argon-atmosphere glovebox and has been used for equipment qualification, process development, and process qualification - the demonstration of process reliability for production of the DOE-qualified metal waste form. The second furnace will be transferred into a hot cell for production of metal waste. Prototype production-scale ceramic waste equipment has been constructed or procured; some equipment has been qualified with fission product-loaded salt in the hot cell. Qualification of the remaining equipment with surrogate materials is underway. (author)

  10. 5 CFR 302.403 - Qualifications for promotion.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications for promotion. 302.403... EMPLOYMENT IN THE EXCEPTED SERVICE Selection and Appointment; Reappointment; and Qualifications for Promotion § 302.403 Qualifications for promotion. In determining qualifications for promotion with respect to an...

  11. Waste Acceptance System Requirements document (WASRD)

    International Nuclear Information System (INIS)

    1993-01-01

    This Waste Acceptance System Requirements document (WA-SRD) describes the functions to be performed and the technical requirements for a Waste Acceptance System for accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) into the Civilian Radioactive Waste Management System (CRWMS). This revision of the WA-SRD addresses the requirements for the acceptance of HLW. This revision has been developed as a top priority document to permit DOE's Office of Environmental Restoration and Waste Management (EM) to commence waste qualification runs at the Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF) in a timely manner. Additionally, this revision of the WA-SRD includes the requirements from the Physical System Requirements -- Accept Waste document for the acceptance of SNF. A subsequent revision will fully address requirements relative to the acceptance of SNF

  12. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  13. Interim staff position on environmental qualification of safety-related electrical equipment: including staff responses to public comments. Regulatory report

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1981-07-01

    This document provides the NRC staff positions regarding selected areas of environmental qualification of safety-related electrical equipment, in the resolution of Unresolved Safety Issue A-24, 'Qualification of Class IE Safety-Related Equipment.' The positions herein are applicable to plants that are or will be in the construction permit (CP) or operating license (OL) review process and that are required to satisfy the requirements set forth in either the 1971 or the 1974 version of IEEE-323 standard

  14. RMs1: qualification results of the rotary miniature Stirling cryocooler at Thales Cryogenics

    Science.gov (United States)

    Martin, Jean-Yves; Seguineau, Cédric; Van-Acker, Sébastien; Sacau, Mikel; Le Bordays, Julien; Etchanchu, Thierry; Vasse, Christophe; Abadie, Christian; Laplagne, Gilles; Benschop, Tonny

    2017-05-01

    The trend for miniaturized Integrated Dewar and Cooler Assemblies (IDCA) has been confirmed over the past few years with several mentions of a new generation of IR detector working at High Operating Temperature (HOT). This key technology enables the use of cryocooler with reduced needs of cryogenics power. As a consequence, miniaturized IDCA are the combination of a HOT IR detector coupled with a low-size, low-weight and low-power (SWaP) cryocooler. Thales Cryogenics has developed his own line of SWaP products. Qualification results on linear solution where shown last year. The current paper focuses on the latest results obtained on RMs1 prototypes, the new rotary SWaP cryocooler from Thales Cryogenics. Cryogenic performances and induced vibrations are presented. In a second part, progress is discussed on compactness and weight on one side, and on power consumption on the other side. It shows how the trade-off made between weight and power consumption could lead to an optimized solution at system level. At least, an update is made on the qualification status.

  15. Qualification of the Improved rotating probe process for steam generator tubes inspection

    International Nuclear Information System (INIS)

    Caston, D.

    2002-01-01

    In 1997, EDF called for bids to Eddy Current (EC) probes manufacturers to supply rotating probes in order to improve the inspection of the Roll Transition Zone of Steam Generator tubes. Several probes met EDF requirements, and after full assessment, EDF chose one between several EC rotating probe prototypes. For the state of its technical study, EDF chose CEGELEC NDTs services among French ISI SG NDT providers, to inspect a limited number of tubes on two French NPP in 2000 with this prototype. Improved Rotating Probe process technical requirements were provided by EDF with the SG contract specifications in June 2000. They dictate technique performances level and acquisition rate of this new process using two techniques at the same time: - STL classic technique applied for detection and sizing of axial cracks; - STT technique, applied for detection and Sizing of circumferential cracks and wear. It has to be used, instead of classic STL process, without increasing inspection duration and SG occupancy. In competition for the qualification, CEGELEC NDT decided to design a new probe with its providers, including the two EC sensors and meeting EDF's requirements. Two another new equipment, designed in CEGELEC NDT laboratories, have been integrated into Improved Rotating Probe Process: - 'STL Lift', new rotating probe push-puller for Roll Transition Zone inspection; - 'ANASTL', on-line STL and STT data quality check, on-line data processing and analysis software. Without talking about performances of the technique and results obtained on site, this paper presents the new equipment, the different phases of the qualification conducted according to RSE-M rules, the first field experiences in August 2001 and the feedback experience of following site inspections. (author)

  16. IEEE Std 535-1986: IEEE standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 308-1980 can be demonstrated by using the procedures provided in this standard in accordance with ANSI/IEEE Std 323-1983. Battery sizing, maintenance, capacity testing, installation, charging equipment, and consideration of other type batteries are beyond the scope of this standard

  17. Environmental qualification program for new designs

    International Nuclear Information System (INIS)

    Doerffer, K.

    2007-01-01

    Qualification of nuclear power plant equipment and components important to safety (ITS) is an integral part of the design process. The qualification methodology differs based on the severity of service conditions (operational and ambient), to which the ITS equipment is exposed. In Canada, the licensing requirements for environmental qualification for new designs are governed by the Canadian Standard Association (CSA) standard, N290.13-2005 titled 'Environmental Qualification of Equipment for CANDU Nuclear Power Plants' and the pre-consultation draft, 'Requirements for Design of Nuclear Power Plants'(DRD), issued for trial use by the Canadian Nuclear Safety Commission (CNSC) in March 2005. This paper will describe AECL's current Environmental Qualification program developed to comply with the above licensing requirements as applied to new designs. The focus will be given to qualification of ITS systems structures and components (SSC) to harsh conditions occurring due to the Design Basis Accidents (DBA). (author)

  18. DATA QUALIFICATION REPORT: DATA QUALIFICATION REPORT FOR 1991 1:1200 TOPOGRAPHIC MAPS FOR USE ON THE YUCCA MOUNTAIN PROJECT

    International Nuclear Information System (INIS)

    Knop, M.F.; Grant, T.A.; Bonisolli, R.W.

    2005-01-01

    This Data Qualification Report (DQR) is prepared in accordance with the provisions of AP-SIII.2Q, Rev. 0, ICN 3, Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data and Data Qualification Plan for 1991 Topographic Maps 1:1200 Scale for use on the Yucca Mountain Project, DQP-WHS-CI-000001, Rev. 00 (BSC 2002a). This DQR presents an evaluation of a set of 90 topographic sheets at 1:1200 scale (and an associated electronic file) that covers an approximate 18 square mile area surrounding the proposed Yucca Mountain Project repository surface facilities location in Midway Valley, Nevada. These maps, that require qualification, are now being used to determine the physical characteristics of watershed sub-areas, interconnecting channels, and drainage channel cross-sections for hydrologic engineering studies of the north portal pad and vicinity. The result of this effort is to qualify one data tracking number (DTN) containing the electronic version of the mapping data. This DTN is: M09906COV98462.000. Coverage: TOP02FTS. The underlying quality assurance (QA) issue associated with these topographic maps is that the maps were originally designated as not for use in the design of items important to safety, waste isolation, and/or of programmatic importance. The maps were therefore generated outside the U.S. Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) QA program. Based on a comparison with corroborating information, this report concludes that the topographic maps are qualified. The comparison found that the mapping was reasonably accurate when compared with other mapping and survey data within the coverage area of the maps. Relative map accuracy was found to be very good and suitable for the hydrologic engineering studies being considered. Absolute accuracy is good but could not be demonstrated to comply with national map accuracy standards. Point locations that require high absolute accuracy should be

  19. Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2013-02-01

    The purpose of this report is to describe programs and tools for assessment of accomplished and documented qualification with respect to ageing of electrical equipment and for development of complimentary ageing management programs. In addition to description of complete programs for management of ageing, tools for validation of the status with regard to ageing of installed ('old') equipment and, where needed, for complementation of their qualification are also included. The report is restricted to safety related equipment containing ageing sensitive parts, mainly organic materials. To this category belong cables and cable joints and a number of equipment containing oils, seals (o-rings), etc. For equipment located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. The main part of this report deals with the qualification of such equipment. Some safety related equipment outside the containment can be located in areas where they are subjected to high temperature and other excessive environmental stresses during normal operation and in areas affected by an accident. Therefore, some material is given also on qualification of equipment located outside containment with better possibilities for frequent inspection and supervision. Part 1 of the report is an executive summary with a general review of the methodologies and their application. The more detailed description of the programs and underlying material, useful data, etc. is given in Part 2

  20. FY97 ICCS prototype specification

    International Nuclear Information System (INIS)

    Woodruff, J.

    1997-01-01

    The ICCS software team will implement and test two iterations of their software product during FY97. This document specifies the products to be delivered in that first prototype and projects the direction that the second prototype will take. Detailed specification of the later iteration will be written when the results of the first iteration are complete. The selection of frameworks to be implemented early is made on a basis of risk analysis from the point of view of future development in the ICCS project. The prototype will address risks in integration of object- oriented components, in refining our development process, and in emulation testing for FEP devices. This document is a specification that identifies products and processes to undertake for resolving these risks. The goals of this activity are to exercise our development process at a modest scale and to probe our architecture plan for fundamental limits and failure modes. The product of the iterations will be the framework software which will be useful in future ICCS code. Thus the FY97 products are intended for internal usage by the ICCS team and for demonstration to the FEP software developers of the strategy for integrating supervisory software with FEP computers. This will be the first of several expected iterations of the software development process and the performance measurements that ICCS will demonstrate, intended to support confidence in our ability to meet project RAM goals. The design of the application software is being carried out in a separate WBS 1.5.2 activity. The design activity has as its FY97 product a series of Software Design Documents that will specify the functionality of the controls software of ICCS. During the testing of this year''s prototypes, the application functionality needed for test will be provided by sample maintenance controls. These are early precursors of controls that can be used for low level device control. Since the devices under test will be represented by

  1. Mechanical properties used for the qualification of transport casks: Prototype development and extension to serial production

    International Nuclear Information System (INIS)

    Salzbrenner, R.; Crenshaw, T.B.; Sorenson, K.B.

    1992-01-01

    A thorough understanding of the mechanical behavior of material in a specific cask is required to properly analyze the structural response of the cask. An appropriate way to establish this understanding is through laboratory testing of cask material. The laboratory testing that was done to support the MOSAIK Drop Test Program is summarized as an example of how mechanical properties can be mapped for a prototype cask. The broad range of measured properties allows the critical aspects of mechanical behavior to be understood. This is necessary for the proper application of fracture mechanics, and focuses on fracture toughness as the inherent materials property which quantifies the fracture resistance of a material. The general fracture mechanics approach and its application to specific cask designs are described elsewhere (Salzbrenner et al. 1990, Sorenson et al. 1992a, Sorenson et al. 1992b). The understanding established by a thorough mapping of the mechanical properties is necessary to apply fracture mechanics to a particular prototype, but it is not sufficient for qualifying serially produced casks. The mechanical behavior of a prototype must be correctly associated with parameters which can be measured on production casks. Since the production casks cannot be destructively tested, measurements are commonly made on sub-size specimens. This may prevent direct measurement of valid design properties. An additional database may then be required to establish the correlation between sub-size specimen measurements and valid design properties. This is illustrated by outlining the additional testing which would be necessary to allow the successful verification of the MOSAIK Drop Test Program to be extended from the prototype to serially produced casks

  2. 5 CFR 319.302 - Individual qualifications.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Individual qualifications. 319.302... Individual qualifications. Agency heads are delegated authority to approve the qualifications of individuals appointed to SL and ST positions. The agency head must determine that the individual meets the...

  3. VHDL basics applied design by SIPAC qualification system

    International Nuclear Information System (INIS)

    Park, In Ha; Mun, Da Cheol; Lee, Gwang Yeob

    2005-12-01

    This book has six chapters, which are about Flowrian of SIPAC qualification system including internet CAD system and remote server service, logic circuit on design and qualification of device such as gate circuit, multiplex and decoder, order logic circuit with D type flip-flop design and qualification and Rom and RAM's design and qualification, finite state machine such as odd checker, sequence detector, test clock generator and traffic light controller, design and qualification about data path, design of application circuit. It has two appendixes on install and the way to use SIPAC qualification system and remote service for SIPAC qualification system.

  4. Protótipo de sistema de documentação em enfermagem no puerpério Documentation system prototype for postpartum nursing

    Directory of Open Access Journals (Sweden)

    Regina Célia Sales Santos Veríssimo

    2013-01-01

    Full Text Available OBJETIVO: Desenvolver protótipo de sistema de documentação em enfermagem no puerpério. MÉTODOS: Planejamento de software utilizou modelo baseado em orientação a objetos, que englobou: compreensão e definição do contexto e dos modos de utilização projeto de arquitetura do sistema, identificação dos principais objetos do sistema, desenvolvimento dos modelos do projeto, especificação das interfaces dos objetos. Foram utilizadas as linguagem Structured Query Language (SQL, MySQL e Hypertext Preprocessor (php. RESULTADOS: O protótipo apresenta os requisitos planejados, entre eles: uso da Classificação Internacional para a Prática de Enfermagem (CIPE® versão 1.0 como código de apoio para execução do processo de enfermagem; apresentação dos eixos da CIPE® versão 1.0 em ordem de uso; geração de relatórios sobre a prática de uso dos processos de enfermagem. CONCLUSÃO: O protótipo de sistema de documentação proposto foi desenvolvido com sucesso com possibilidade de registros de enfermagem por meio de linguagem padronizada.OBJECTIVE: To develop a documentation system prototype for postpartum nursing. METHODS: For the software planning, a model based on object orientation was used, which included: understanding and definition of the context and usage modes of the system design project, identification of the main objects of the system, development of project models, specification of object interfaces. The languages Structured Query Language (SQL, MySQL and Hypertext Preprocessor (php were used. RESULTS: The prototype shows the planned requirements, among them: use of the International Classification For Nursing Practice (ICNP® version 1.0 as support code to perform the nursing process; presentation of the axes of ICNP® version 1.0 in order of use; elaboration of reports about the usage practice of nursing processes. CONCLUSION: The proposed documentation system prototype was successfully developed, allowing professional

  5. Column Stores as an IR Prototyping Tool

    NARCIS (Netherlands)

    H.F. Mühleisen (Hannes); T. Samar (Thaer); J.J.P. Lin (Jimmy); A.P. de Vries (Arjen)

    2014-01-01

    textabstract. We make the suggestion that instead of implementing custom index structures and query evaluation algorithms, IR researchers should simply store document representations in a column-oriented relational database and write ranking models using SQL. For rapid prototyping, this is

  6. Report on architecture description for the INFLO prototype.

    Science.gov (United States)

    2014-01-01

    This report documents the Architecture Description for the implementation of the Intelligent Network Flow Optimization : (INFLO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle Program. The : intent is...

  7. IEEE Std 535-1979: IEEE standard for qualification of Class 1E lead storage batteries for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes qualification methods for Class 1E lead storage batteries and racks to be used in nuclear power generating stations outside of primary containment. Qualification required in ANSI/IEEE Std 279-1971 and IEE Std 308-1978, can be demonstrated by using the procedures provided in this standard in accordance with IEEE Std 323-1974. Battery sizing, maintenance, capacity testing, installation, charging equipment and consideration of other type batteries are beyond the scope of this standard

  8. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 2

    International Nuclear Information System (INIS)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction

  9. High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction.

  10. Qualification program of the ASTRID SFR project: definition, methodology and associated risk evaluation and management - 15093

    International Nuclear Information System (INIS)

    Rodriguez, G.; Dirat, J.F.; Traina, A.; Christofari, M.

    2015-01-01

    The Preconceptual Design phase of the ASTRID French Sodium Fast Reactor project had the objective to integrate innovative options to meet the requirements of the 4. generation reactors and to comply with the related specifications. It was followed by the conceptual phase studies (AVP2 phase 2013-2015) where some technical options are left opened with an advanced option and a backup alternative. In the same time of the AVP2 phase studies, the qualification program related to ASTRID project was initiated. It consists in collecting the exhaustive list of research/development (R/D) needs and technological demonstration tests to be fulfilled on representative mockup prior to component implementation in the prototype. The ASTRID Qualification Program (AQP) objectives are to collect needs expressed by all engineering companies involved in ASTRID, and then to organize the answer to this expression of needs. This significant work of needs compilation has been divided in several tasks, according to the ASTRID project decomposition in the Product Breakdown Structure (PBS). Compilation of needs was jointly performed by engineering company, R/D responsible and coordinated by the ASTRID Qualification project responsible. It was associated with an evaluation of the maturity level of the technical options thanks to a Technological Readiness Level grid (TRL ranking table), an identification of major risks, and an evaluation of the R/D potentiality and associated facility platform. The methodology applied for the ASTRID Qualification Program (AQP) is presented. It is explained what methodology was used associated to the TRL process, and how is managed the associated risk analysis evaluation: evaluation of major risks, definition of a risk portfolio and a corresponding Action Plan for risk reduction (synthesized under the REM acronym: Risk Evaluation and Management). This methodology is a mean used to facilitate ASTRID risk-informed decision making, technology qualification and

  11. Report on detailed requirements for the INFLO prototype.

    Science.gov (United States)

    2013-12-01

    This report documents the System Requirements for the implementation of the Intelligent Network Flow Optimization (INFLO) : Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle Program. It builds off of : t...

  12. BWR reactor water cleanup system flexible wedge gate isolation valve qualification and high energy flow interruption test

    International Nuclear Information System (INIS)

    DeWall, K.G.; Steele, R. Jr.

    1989-10-01

    This report presents the results of research performed to develop technical insights for the NRC effort regarding Generic Issue 87, ''Failure of HPCI Steam Line Without Isolation.'' Volume III of this report contains the data and findings from the original research performed to assess the qualification of the valves and reported in EGG-SSRE-7387, ''Qualification of Valve Assemblies in High Energy BWR Systems Penetrating Containment.'' We present the original work here to complete the documentation trail. The recommendations contained in Volume III of this report resulted in the test program described in Volume I and II. The research began with a survey to characterize the population of normally open containment isolation valves in those process lines that connect to the primary system and penetrate containment. The qualification methodology used by the various manufacturers identified in the survey is reviewed and deficiencies in that methodology are identified. Recommendations for expanding the qualification of valve assemblies for high energy pipe break conditions are presented. 11 refs., 1 fig., 2 tabs

  13. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  14. Automating testbed documentation and database access using World Wide Web (WWW) tools

    Science.gov (United States)

    Ames, Charles; Auernheimer, Brent; Lee, Young H.

    1994-01-01

    A method for providing uniform transparent access to disparate distributed information systems was demonstrated. A prototype testing interface was developed to access documentation and information using publicly available hypermedia tools. The prototype gives testers a uniform, platform-independent user interface to on-line documentation, user manuals, and mission-specific test and operations data. Mosaic was the common user interface, and HTML (Hypertext Markup Language) provided hypertext capability.

  15. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  16. SIMS prototype system 1 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The space and domestic water solar heating system designated SIMS Prototype Systems 1 was evaluated. The test system used 720 ft (gross) of Solar Energy Products Air Collectors, a Solar Control Corporation SAM 20 Air Handler with Model 75-175 control unit, a Jackson Solar Storage tank with Rho Sigma Mod 106 controller, and 20 tons of rack storage. The test data analysis performed evaluates the system performance and documents the suitability of SIMS Prototype System 1 hardware for field installation.

  17. Hanford Waste Vitrification Plant Quality Assurance Program description for defense high-level waste form development and qualification

    International Nuclear Information System (INIS)

    Hand, R.L.

    1992-01-01

    This document describes the quality assurance (QA) program of the Hanford Waste Vitrification Plant (HWVP) Project. The purpose of the QA program is to control project activities in such a manner as to achieve the mission of the HWVP Project in a safe and reliable manner. A major aspect of the HWVP Project QA program is the control of activities that relate to high-level waste (HLW) form development and qualification. This document describes the program and planned actions the Westinghouse Hanford Company (Westinghouse Hanford) will implement to demonstrate and ensure that the HWVP Project meets the US Department of Energy (DOE) and ASME regulations. The actions for meeting the requirements of the Waste Acceptance Preliminary Specifications (WAPS) will be implemented under the HWVP product qualification program with the objective of ensuring that the HWVP and its processes comply with the WAPS established by the federal repository

  18. Worthwhile optical method for free-form mirrors qualification

    Science.gov (United States)

    Sironi, G.; Canestrari, R.; Toso, G.; Pareschi, G.

    2013-09-01

    We present an optical method for free-form mirrors qualification developed by the Italian National Institute for Astrophysics (INAF) in the context of the ASTRI (Astrofisica con Specchi a Tecnologia Replicante Italiana) Project which includes, among its items, the design, development and installation of a dual-mirror telescope prototype for the Cherenkov Telescope Array (CTA) observatory. The primary mirror panels of the telescope prototype are free-form concave mirrors with few microns accuracy required on the shape error. The developed technique is based on the synergy between a Ronchi-like optical test performed on the reflecting surface and the image, obtained by means of the TraceIT ray-tracing proprietary code, a perfect optics should generate in the same configuration. This deflectometry test allows the reconstruction of the slope error map that the TraceIT code can process to evaluate the measured mirror optical performance at the telescope focus. The advantages of the proposed method is that it substitutes the use of 3D coordinates measuring machine reducing production time and costs and offering the possibility to evaluate on-site the mirror image quality at the focus. In this paper we report the measuring concept and compare the obtained results to the similar ones obtained processing the shape error acquired by means of a 3D coordinates measuring machine.

  19. Pilot study approach and qualification dossier components

    International Nuclear Information System (INIS)

    Ammirato, F.; Ashwin, P.

    2000-01-01

    The aim of the Pilot Project is to evaluate the IAEA Guidelines and methodology for the benefit of IAEA Member States trough a simulation of qualification activities. The Project is based on a real component and available data - NPP Kozloduy unit 5, weld 3. The initial phase is limited to the Qualification dossier. The Project relies on the input from the team members and Member States. Team organization and responsibilities are presented. The components of the Qualification Dossier (technical specification, inspection procedure and preliminary review, qualification procedure) and their current status are also presented. A comparison is done with their qualification programs. The characteristics of performance demonstrations are discussed. The results show that the teamwork has been successful and the IAEA methodology covers all situations. It is expected that the End Project will become 'Benchmark's' for future qualification activities

  20. Fabrication of small mock-ups reflecting the design features of the ITER semi-prototype

    International Nuclear Information System (INIS)

    Jung, Yang-Il; Choi, Byoung-Kwon; Park, Jeong-Yong; Kim, Suk-Kwon; Lee, Dong Won; Kim, Byoung Yoon

    2012-01-01

    The ITER semi-prototype was designed to qualify the manufacturing technology for the ITER blanket first wall. However, its fabrication is expected to face great difficulty due to a design complexity. Even though joining technology for different materials such as beryllium, CuCrZr, and stainless steel (SS) was developed during the first stage of qualification, the joining is still a key issue for the fabrication of the semi-prototype. In this study, small mock-ups (SMU) were fabricated to realize and verify the manufacturing of the semi-prototype reflecting the described design features. The joining of multiple beryllium tiles on the angled CuCrZr surface was confirmed with SMU no. 1. Six beryllium tiles were joined using hot isostatic pressing (HIP), and slitting was then performed to form multiple tiles. In SMU no. 2, HIP was performed two times in order to facilitate the cooling channels at the CuCrZr/SS interface, and to join the beryllium tiles on CuCrZr/SS. The method used to form a pressure boundary for the complex cooling channels was also developed by fabricating the SMU no. 3. The SMUs confirmed the applicability of the HIP for the manufacturing of the semi-prototype.

  1. 49 CFR 180.507 - Qualification of tank cars.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Qualification of tank cars. 180.507 Section 180... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used...

  2. An international survey of MRI qualification and certification frameworks with an emphasis on identifying elements of good practice

    International Nuclear Information System (INIS)

    Castillo, J.; Caruana, C.J.; Morgan, P.S.; Westbrook, C.; Mizzi, A.

    2017-01-01

    The purpose of the study was to survey MRI qualification and certification frameworks in the major English-speaking countries (Australia, New Zealand, US, Canada, UK, Ireland) with the aim of identifying elements of good practice. The intention is to incorporate these elements in a national framework that could be used in supporting an MRI specialist register. The study was conducted using document analysis of MRI qualification and certification documents from these states with data triangulated through a web-based questionnaire amongst an expert group of MRI radiographers (n = 59) from the same states. Based on the results of the study, recommendations have been put forward for those countries that are in the process of developing such frameworks. The main recommendations include that a professional or regulatory body externally accredits MRI programmes and that learning outcomes be based on an MRI competence profile that addresses current and forecasted needs of the particular country. The MRI competence profile should encompass a novice-to expert continuum and be referenced directly to a national qualification framework. Ideally each level of expertise should be assessed and evidenced by a portfolio of CPD activities, including clinical and management case studies appropriate to that level. - Highlights: • Professional or regulatory bodies should accredit MRI academic programmes. • Competence profiles should reflect and support local MRI services. • MRI competence profiles should be structured in a novice-to-expert continuum format. • Competence profiles should reference national qualification/certification frameworks. • Mandatory certification could lead to registration in an MRI specialist register.

  3. KAEC experience in development of the regulatory framework for training and qualification

    International Nuclear Information System (INIS)

    Kim, A.; Idrissova, M.; Kossilov, Al.; Pryakhin, A.

    2002-01-01

    Full text: Since 1991, after getting of the sovereignty, Kazakhstan started developing of its own legislative and regulatory system in the field of atomic energy use. In accordance with the Decrees of the President appropriate structures in Kazakhstan were created. They are: Atomic Energy Committee, as a main supervising governmental body, National Nuclear Centre combining all nuclear related scientific institutes, and National Atomic Company Kazatomprom. On 14 February 1994 Kazakhstan joined the International Atomic Energy Agency. Also a lot of enterprises use radioactive sources for the different application in medicine, research, industry, agriculture and etc. Infrastructure of the using of atomic energy in Kazakhstan includes: One power fast reactor BN-350 (now it is shut down and prepared for the decommissioning); Four Research reactors of the National Nuclear Centre; Uranium mining and milling enterprises; Fuel fabrication plant; Storage facilities for nuclear materials, radiation substances and radioactive waste; Organizations using radiation sources; Transport organizations. According to this the Republic of Kazakhstan needs the effective system for the assurance and guarantees for protection of population and environment against the possible negative influence of atomic energy usage. One of the important parts of that is a system of training and qualification of personnel involved in the nuclear activity. In the legislative field of the safely use of nuclear energy several Laws of the Republic of Kazakhstan have been elaborated and adopted. They are: Law on Atomic Energy Use (14 April 1997, Law on Radiation Protection of Population (23 April 1998), Law on Licensing. Those documents formed the first level of the structure of the national system for reliable training, qualification and authorization of the personnel involved in the nuclear activities. The second level is formed by the Legal Acts of the Government of Kazakhstan. The other levels of the

  4. Development and Analysis of Desiccant Enhanced Evaporative Air Conditioner Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Kozubal, E.; Woods, J.; Judkoff, R.

    2012-04-01

    This report documents the design of a desiccant enhanced evaporative air conditioner (DEVAP AC) prototype and the testing to prove its performance. Previous numerical modeling and building energy simulations indicate a DEVAP AC can save significant energy compared to a conventional vapor compression AC (Kozubal et al. 2011). The purposes of this research were to build DEVAP prototypes, test them to validate the numerical model, and identify potential commercialization barriers.

  5. ENIQ: European Network for Inspection Qualification

    International Nuclear Information System (INIS)

    Champigny, F.; Crutzen, S.; Lemaitre, P.

    1995-01-01

    Many countries are currently considering their own approach to inspection qualification and are carefully assessing experience to date. ENIQ, which stands for European Network for Inspection Qualification, groups the major part of the utilities in Western Europe. The general objective of ENIQ is to coordinate and manage at European level expertise and resources for the assessment and qualification of NDE inspection techniques and procedures, primarily for nuclear components. Also non-nuclear heavy duty components will be considered. Within ENIQ there is a growing consensus of opinion on the general principles of a European approach towards inspection qualification. In this paper the main activities, organization and actual status of ENIQ will be discussed

  6. Mechatronics Education: From Paper Design to Product Prototype Using LEGO NXT Parts

    Science.gov (United States)

    Lofaro, Daniel M.; Le, Tony Truong Giang; Oh, Paul

    The industrial design cycle starts with design then simulation, prototyping, and testing. When the tests do not match the design requirements the design process is started over again. It is important for students to experience this process before they leave their academic institution. The high cost of the prototype phase, due to CNC/Rapid Prototype machine costs, makes hands on study of this process expensive for students and the academic institutions. This document shows that the commercially available LEGO NXT Robot kit is a viable low cost surrogate to the expensive industrial CNC/Rapid Prototype portion of the industrial design cycle.

  7. The use of case tools in OPG safety analysis code qualification

    International Nuclear Information System (INIS)

    Pascoe, J.; Cheung, A.; Westbye, C.

    2001-01-01

    Ontario Power Generation (OPG) is currently qualifying its critical safety analysis software. The software quality assurance (SQA) framework is described. Given the legacy nature of much of the safety analysis software the reverse engineering methodology has been adopted. The safety analysis suite of codes was developed over a period of many years to differing standards of quality and had sparse or incomplete documentation. Key elements of the reverse engineering process require recovery of design information from existing coding. This recovery, if performed manually, could represent an enormous effort. Driven by a need to maximize productivity and enhance the repeatability and objectivity of software qualification activities the decision was made to acquire or develop and implement Computer Aided Software Engineering (CASE) tools. This paper presents relevant background information on CASE tools and discusses how the OPG SQA requirements were used to assess the suitability of available CASE tools. Key findings from the application of CASE tools to the qualification of the OPG safety analysis software are discussed. (author)

  8. Dose mapping for documentation of radiation sterilization

    DEFF Research Database (Denmark)

    Miller, A.

    1999-01-01

    The radiation sterilization standards EN 552 and ISO 11137 require that dose mapping in real or simulated product be carried in connection with the process qualification. This paper reviews the recommendations given in the standards and discusses the difficulties and limitations of practical dose...... mapping. The paper further gives recommendations for effective dose mapping including traceable dosimetry, documented procedures for placement of dosimeters, and evaluation of measurement uncertainties. (C) 1999 Elsevier Science Ltd. All rights reserved....

  9. Equipment qualification testing methodology research at Sandia Laboratories

    International Nuclear Information System (INIS)

    Jeppesen, D.

    1983-01-01

    The Equipment Qualification Research Testing (EQRT) program is an evolutionary outgrowth of the Qualification Testing Evaluation (QTE) program at Sandia. The primary emphasis of the program has been qualification methodology research. The EQRT program offers to the industry a research-oriented perspective on qualification-related component performance, as well as refinements to component testing standards which are based upon actual component testing research

  10. Operations management system advanced automation: Fault detection isolation and recovery prototyping

    Science.gov (United States)

    Hanson, Matt

    1990-01-01

    The purpose of this project is to address the global fault detection, isolation and recovery (FDIR) requirements for Operation's Management System (OMS) automation within the Space Station Freedom program. This shall be accomplished by developing a selected FDIR prototype for the Space Station Freedom distributed processing systems. The prototype shall be based on advanced automation methodologies in addition to traditional software methods to meet the requirements for automation. A secondary objective is to expand the scope of the prototyping to encompass multiple aspects of station-wide fault management (SWFM) as discussed in OMS requirements documentation.

  11. 14 CFR 121.453 - Flight engineer qualifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  12. MPACT Fast Neutron Multiplicity System Prototype Development

    Energy Technology Data Exchange (ETDEWEB)

    D.L. Chichester; S.A. Pozzi; J.L. Dolan; M.T. Kinlaw; S.J. Thompson; A.C. Kaplan; M. Flaska; A. Enqvist; J.T. Johnson; S.M. Watson

    2013-09-01

    This document serves as both an FY2103 End-of-Year and End-of-Project report on efforts that resulted in the design of a prototype fast neutron multiplicity counter leveraged upon the findings of previous project efforts. The prototype design includes 32 liquid scintillator detectors with cubic volumes 7.62 cm in dimension configured into 4 stacked rings of 8 detectors. Detector signal collection for the system is handled with a pair of Struck Innovative Systeme 16-channel digitizers controlled by in-house developed software with built-in multiplicity analysis algorithms. Initial testing and familiarization of the currently obtained prototype components is underway, however full prototype construction is required for further optimization. Monte Carlo models of the prototype system were performed to estimate die-away and efficiency values. Analysis of these models resulted in the development of a software package capable of determining the effects of nearest-neighbor rejection methods for elimination of detector cross talk. A parameter study was performed using previously developed analytical methods for the estimation of assay mass variance for use as a figure-of-merit for system performance. A software package was developed to automate these calculations and ensure accuracy. The results of the parameter study show that the prototype fast neutron multiplicity counter design is very nearly optimized under the restraints of the parameter space.

  13. SIMS prototype System 3 test results: engineering analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  14. SIMS prototype system 3 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating is presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  15. SIMS Prototype System 4: performance test report

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-09

    The results obtained during testing of a self-contained, preassembled air type solar system, designed for installation remote from the dwelling, to provide space heating and hot water are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 4 for field installation.

  16. Developing e-banking services for rural India: making use of socio-technical prototypes

    DEFF Research Database (Denmark)

    Dittrich, Yvonne; Vaidyanathan, Lakshmi; Gonsalves, Timothy A

    2017-01-01

    an experience report based on systematic debriefing of involved project leaders and initiators, triangulated with additional documentation. The concept of Socio-Technical Prototype is developed and used to show how to mitigate the challenges of ICT based banking service provision for socially constrained...... communities. The concept of Socio-Technical Prototype extends the notion of prototypes, as it implies a full functioning implementation of the service including all relevant stakeholders. In order to not only prototype end-user functionality but also the interaction of the solution with the specific social......, technical and physical environment. The implications for software engineering in the development of such large-scale prototypes and pilots are outlined....

  17. Materials qualification for nuclear power plants

    International Nuclear Information System (INIS)

    Braconi, F.

    1987-01-01

    The supply of materials to be used in the fabrication of components submitted to pressure destined to Atucha II nuclear power plant must fulfill the quality assurance requirements in accordance with the international standards. With the aim of promoting the national participation in CNA II, ENACE had the need to adapt these requirements to the national industry conditions and to the availability of official entities' qualification and inspection. As a uniform and normalized assessment for the qualification of materials did not exist in the country, ENACE had to develop a materials suppliers qualification system. This paper presents a suppliers qualification procedure, its application limits and the alternative procedures for the acceptance of individual stock and for the stock materials purchase. (Author)

  18. Unintended Consequences: How Qualification Constrains Innovation

    Science.gov (United States)

    Brice, Craig A.

    2011-01-01

    The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

  19. Establishment of an unrelated umbilical cord blood bank qualification program: ensuring quality while meeting Food and Drug Administration vendor qualification requirements.

    Science.gov (United States)

    Rabe, Fran; Kadidlo, Diane; Van Orsow, Lisa; McKenna, David

    2013-10-01

    Qualification of a cord blood bank (CBB) is a complex process that includes evaluation of multiple aspects of donor screening and testing, processing, accreditation and approval by professional cell therapy groups, and results of received cord blood units. The University of Minnesota Medical Center Cell Therapy Laboratory has established a CBB vendor qualification process to ensure the CBB meets established regulatory and quality requirements. The deployed qualification of CBBs is based on retrospective and prospective review of the CBB. Forty-one CBBs were evaluated retrospectively: seven CBBs were disqualified based on failed quality control (QC) results. Eight CBBs did not meet the criteria for retrospective qualification because fewer than 3 cord blood units were received and the CBB was not accredited. As of March 2012, three US and one non-US CBBs have been qualified prospectively. One CBB withdrew from the qualification process after successful completion of the comprehensive survey and subsequent failure of the provided QC unit to pass the minimum criteria. One CBB failed the prospective qualification process based on processing methods that were revealed during the paper portion of the evaluation. A CBB qualification process is necessary for a transplant center to manage the qualification of the large number of CBBs needed to support a umbilical cord blood transplantation program. A transplant center that has utilized cord blood for a number of years before implementation of a qualification process should use a retrospective qualification process along with a prospective process. © 2013 American Association of Blood Banks.

  20. Applying Hypertext Structures to Software Documentation.

    Science.gov (United States)

    French, James C.; And Others

    1997-01-01

    Describes a prototype system for software documentation management called SLEUTH (Software Literacy Enhancing Usefulness to Humans) being developed at the University of Virginia. Highlights include information retrieval techniques, hypertext links that are installed automatically, a WAIS (Wide Area Information Server) search engine, user…

  1. Characterization Of The As-Received Sludge Batch 9 Qualification Sample (Htf-51-15-81)

    Energy Technology Data Exchange (ETDEWEB)

    Pareizs, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-09-30

    Savannah River National Laboratory (SRNL) personnel have been requested to qualify the next sludge batch (Sludge Batch 9 – SB9) for processing at the Defense Waste Processing Facility (DWPF). To accomplish this task, Savannah River Remediation (SRR) has sent SRNL a 3-L slurried sample of Tank 51H (HTF-51-15-81) to be characterized, washed, and then used in a lab-scale demonstration of the DWPF flowsheet (potentially after combining with Tank 40H sludge). This report documents the first steps of the qualification process – characterization of the as-received Tank 51H qualification sample. These results will be used to support a reprojection of SB9 by SRR from which final Tank 51H washing, frit development, and Chemical Processing Cell (CPC) activities will be based.

  2. Ageing management and equipment qualification

    International Nuclear Information System (INIS)

    Stahl, Gunnar

    2014-01-01

    The knowledge of how the environment and load of organic material in general and especially polymers and lubricants, is affecting the degradation of important properties, have increased during the last decade. However the restrictions using established additives like some color pigments due to their poisonousness e.g. pigments based at cadmium, lead, mercury etc. have caused problems when replacing additives to polymers. The replacement additives have often been used in new design without going through the required material qualification procedure. There have also been observed that some non-qualified and non-approved materials have been installed in some power plants due to false documentation. There are also a lot of new manufacturers, of materials similar to the previously qualified materials, active at the market. This increases the difficulty to ensure that the required material quality is used. New materials, new additives and new manufacturers makes if more and more difficult to assure that the expected material is present. This causes more strict demands of how the new materials often used in equipment at type-testing and in replacement materials are analyzed and documented. By implementing new steps for chemical, mechanical and electrical analysis and increase the general quality assurance content this issue can be managed. (authors)

  3. SAMPLE RESULTS FROM THE INTEGRATED SALT DISPOSITION PROGRAM MACROBATCH 5 TANK 21H QUALIFICATION MST, ESS AND PODD SAMPLES

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T.; Fink, S.

    2012-04-24

    Savannah River National Laboratory (SRNL) performed experiments on qualification material for use in the Integrated Salt Disposition Program (ISDP) Batch 5 processing. This qualification material was a composite created from recent samples from Tank 21H and archived samples from Tank 49H to match the projected blend from these two tanks. Additionally, samples of the composite were used in the Actinide Removal Process (ARP) and extraction-scrub-strip (ESS) tests. ARP and ESS test results met expectations. A sample from Tank 21H was also analyzed for the Performance Objectives Demonstration Document (PODD) requirements. SRNL was able to meet all of the requirements, including the desired detection limits for all the PODD analytes. This report details the results of the Actinide Removal Process (ARP), Extraction-Scrub-Strip (ESS) and Performance Objectives Demonstration Document (PODD) samples of Macrobatch (Salt Batch) 5 of the Integrated Salt Disposition Program (ISDP).

  4. Components Qualification for a Possible use in the Mu2e Calorimeter Waveform Digitizer

    Energy Technology Data Exchange (ETDEWEB)

    Di Falco, S. [INFN, Pisa; Donati, S. [INFN, Pisa; Morescalchi, L. [INFN, Pisa; Pedreschi, E. [INFN, Pisa; Pezzullo, G. [INFN, Pisa; Spinella, F. [INFN, Pisa

    2017-03-30

    The Mu2e experiment at Fermilab searches for the charged flavor violating conversion of a muon into an electron in the Coulomb field of a nucleus. The detector consists of a straw tube tracker and a CSI crystal electromagnetic calorimeter, both housed in a superconducting solenoid. Both the front-end and the digital electronics, located inside the cryostat, will be operated in vacuum under a 1 T magnetic field, having to sustain the high flux of neutrons and ionizing particles coming from the muons stopping target. These harsh experimental conditions make the design of the calorimeter waveform digitizer quite challenging. All the selected commercial devices must be tested individually and qualified for radiation hardness and operation in high magnetic field. At the moment the expected particles flux and spectra at the digitizers location are not completely simulated and we are using initial rough estimates to select the components for the first prototype. We are gaining experience in the qualification procedures using the selected components but the choice will be frozen only when dose and neutron flux simulations will be completed. The experimental results of the first qualification campaign are presented.

  5. Instrumentation qualification. Seismic qualification of C-E instrumentation equipment. Part One

    International Nuclear Information System (INIS)

    1977-05-01

    A summary of the C-E seismic qualification program utilized to demonstrate the seismic design adequacy of the instrumentation and control equipment used in C-E supplied Nuclear Steam Supply Systems (NSSS) is presented. The report is divided into two parts. Part One includes the equipment seismic requirements and a description of the qualification methods. Part Two lists the specific equipment by nuclear station in which it is used and the equipment test results are summarized in a standard data sheet format to facilitate review. The seismic requirements are based on individual contract commitments with C-E customers and the NRC Standard Review Plan, Section 3.10 ''Seismic Qualification of Category I Instrumentation and Electrical Equipment.'' Equipment is qualified for use in a seismic environment where damage potential to the equipment is less than or equal to that simulated seismic environment to which it has been qualified. The anticipated Safe Shutdown Earthquake (SSE) environment at the inservice location of equipment should be confirmed by each applicant as not exceeding that to which it is qualified

  6. Safety analyses for an in-pile SCWR fuel qualification test loop

    Energy Technology Data Exchange (ETDEWEB)

    Schulenberg, T.; Raque, M. [Karlsruhe Inst. of Tech., Karlsruhe (Germany)

    2014-07-01

    As a nuclear facility cooled with supercritical water has never been built nor operated in the past, the planned SCWR fuel qualification test will give the first experience with supercritical water-cooled nuclear systems in general. With a fuel inventory of almost 1 kg of UO{sub 2} with almost 20% enrichment, the supercritical pressure test section inside a low pressure, pool type research reactor needs to be cooled properly even in case of a number of postulated design basis accidents. Depressurization systems and emergency cooling systems will need to be designed with similar reliability as for a prototype reactor to ensure the integrity of barriers retaining the radioactive material. The paper reports about the safety concept and summarizes the safety analyses which have been performed in this context. (author)

  7. Qualification tests for shift personnel in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fechner, J B [Bundesministerium des Innern, Bonn (Germany, F.R.)

    1978-02-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors.

  8. Qualification tests for shift personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1978-01-01

    The selection of personnel for training as shift supervisors or reactor operators so far used to be made by a plant operator mainly on the basis of such criteria as examinations, diplomas and other documents verifying the educational background, the type of activity exercised, and professional success. In addition, there are the opininons of trainers and supervisors based on personal observation of future shift personnel on training for specific plants at a training center, at the manufacturer's, the operator's or in activities in the construction and commissioning of the respective nuclear power plant. In the course of this phase, which normally takes several years, supervisors asses not only the professional capabilities of a trainee, but also bis psychic and physical performance and aptitude, e.g., with respect to decision making, leadership qualifications or behavior unter stress. The advisability of introducing psychological aptitude tests was also studied. However, a decision was recently taken to defer such psychological tests for the time being. Yet, nuclear power plant operators are required to submit a statement to their responsible authorities about industrial medical checkups and qualification assessments by supervisors. (orig.) [de

  9. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 8 discusses Control System SOT Tests Results and Analysis Report. This is a continuation of Book 7

  10. Changing existing qualifications into outcomes-based qualifications ...

    African Journals Online (AJOL)

    Various workshops were facilitated to determine the outcomes of each level of our qualification, B Tech: Policing. This led to the formulation of a purpose statement, exit level outcomes and specific outcomes as well as assessment criteria and the critical outcomes embedded in each level identified. Using the specific ...

  11. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  12. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  13. On relaxing the Mangasarian-Fromovitz constraint qualification

    Czech Academy of Sciences Publication Activity Database

    Kruger, A.Y.; Minchenko, L.; Outrata, Jiří

    2014-01-01

    Roč. 18, č. 1 (2014), s. 171-189 ISSN 1385-1292 R&D Projects: GA ČR GAP402/12/1309 Institutional support: RVO:67985556 Keywords : Nonlinear programming * Regularity conditions * Constraint qualifications * Lagrange multipliers * Mangasarian–Fromovitz constraint qualification * Constant rank constraint qualification Subject RIV: BA - General Mathematics Impact factor: 0.679, year: 2014 http://library.utia.cas.cz/separaty/2014/MTR/outrata-0426110.pdf

  14. 5 CFR 317.502 - Qualifications Review Board certification.

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS EMPLOYMENT IN THE SENIOR EXECUTIVE SERVICE Career Appointments § 317.502 Qualifications Review Board certification. (a) A Qualification Review Board (QRB) convened by OPM must certify the executive... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications Review Board certification...

  15. Nodalization qualification process of the PSBVVER facility for the Cathare2 thermal-hydraulic code

    International Nuclear Information System (INIS)

    Del Nevo, A.; Araneo, D.; D'Auria, F.; Galassi, G.

    2004-01-01

    The present document deals with the nodalization qualification process of the PSB-VVER test facility for Cathare2 code. PSB-VVER facility is a 1/300 volume scale model of a VVER-1000, reactor installed at Electrogorsk Research and Engineering Centre in 1998. The version V1.5b of the Cathare2 code has been used. In order to evaluate the nodalization performance, the qualifying procedure set up at the DIMNP of Pisa University (UNIPI) has been applied that foresees two qualification levels: a 'steady state' level and an 'on transient' level. After the steady state behavior check of the nodalization, it has been preformed the on transient qualification the PSB-VVER test 2. It is a 11% equivalent break in Upper Plenum with the actuation of one high pressure injection system, connected to the hot leg of the loop 4, and 4 passive systems (ECCS hydro-accumulators), connected to the outlet plenum and to the inlet chamber of the downcomer. The low-pressure injection system is not available in the test. The goal of this paper is to demonstrate that the first step of the nodalization qualification adopted for the PSB test analyses is achieved and the PSB facility input deck is available and ready to use. The quantitative accuracy of the performed calculation has been evaluated by using the FFT-BM tool developed at the University of Pisa.(author)

  16. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  17. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  18. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne [Idaho National Lab. (INL), Idaho Falls, ID (United States); Honma, George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

  19. Commissioning of qualification of structures, systems and components for seismic and environmental loads of CIRENE nuclear power plant

    International Nuclear Information System (INIS)

    Bianchi, A.; Gatti, F.; Muzzi, F.; Zola, M.; De Pasquali, F.

    1993-01-01

    On behalf of the Italian National Electricity Board (ENEL) concerning the commissioning of qualification of structures, systems and components of CIRENE NPP, ISMES performed a technical surveillance on the documentation concerning the environmental and seismic qualification of the safety related systems and experimental activities (dynamic and static tests) on plant buildings. The aims of the work were: - the evaluation of the qualification carried out (by test, by analysis, by combination of analysis and test) on the equipment and system, compared with the requirements of the ENEL technical specifications and the most recent international regulations; - the experimental determination of modal quantities (frequencies, damping, mode shapes) of the structures and, in the case of reactor building, the complex impedance of the soil for supporting the analytical work. The present paper deals with the criteria, the system and the results concerning the technical surveillance and with the characteristics and the results of the experimental tests

  20. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  1. Qualification tests for a dosimetry system

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The report of qualification tests for personnel dosemeters is detailed. Qualification test for the energy response and the incidence angle is given. The procedure of test is resumed. Different coefficients of conversion used in these tests are given in tables. (N.C.)

  2. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  3. Prototype road weather performance management tool : installation instructions & user manual.

    Science.gov (United States)

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  4. Prototype development and demonstration for response, emergency staging, communications, uniform management, and evacuation (R.E.S.C.U.M.E.) : R.E.S.C.U.M.E. prototype system architecture.

    Science.gov (United States)

    2014-01-01

    This document provides the high-level system architecture for the Prototype Development and Demonstration of a : R.E.S.C.U.M.E. system. The requirements addressed in this document are based upon those that can be found in : previous R.E.S.C.U.M.E. re...

  5. Orifice jet brazing process development, qualification, and initial application

    International Nuclear Information System (INIS)

    1971-05-01

    Experiments were carried out to develop acceptable procedures for brazing molybdenum alloy orifices to fuel element channel inlets of the NERVA R-1 reactor core. Results achieved with various procedures are described, and qualification tests of the selected process are documented. The recommended procedure includes preplacing of Au-Ni-Cr alloy washers and induction heating to 1600 0 F, holding two minutes, heating further to 2400 0 F, holding one minute, and allowing to cool. Inert atmosphere is used, and fixturing maintains proper positioning of the orifices. Leak testing of the joints has demonstrated reproducibly satisfactory sealing. Repair brazing is feasible if needed. (auth)

  6. Qualification of existing data for high-level nuclear waste repositories: Generic technical position

    International Nuclear Information System (INIS)

    Altman, W.D.; Donnelly, J.P.; Kennedy, J.E.

    1988-02-01

    This document provides guidance on methods of qualifying data not initially collected under a 10 CFR Part 60, Subpart G quality assurance (QA) program. The license applicant for a geologic repository must demonstrate that the applicable health, safety, and environmental regulations in 10 CFR Part 60 have been met. Confidence in the data used to support the license application is obtained through a QA program. Some data which have not been initially generated under a 10 CFR Part 60, Subpart G QA program may be needed to support a license application to construct and operate a geologic repository. This document provides guidance on the use and qualification of data not initially collected under a Subpart G, QA program

  7. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  8. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  9. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 2 discusses the following topics: Fuel Rod Extraction System Test Results and Analysis Reports and Clamping Table Test Results and Analysis Reports

  10. SANSMIC design document.

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Paula D. [Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Rudeen, David Keith [GRAM, Inc., Albuquerque, NM (United States)

    2015-07-01

    The United States Strategic Petroleum Reserve (SPR) maintains an underground storage system consisting of caverns that were leached or solution mined in four salt domes located near the Gulf of Mexico in Texas and Louisiana. The SPR comprises more than 60 active caverns containing approximately 700 million barrels of crude oil. Sandia National Labo- ratories (SNL) is the geotechnical advisor to the SPR. As the most pressing need at the inception of the SPR was to create and fill storage volume with oil, the decision was made to leach the caverns and fill them simultaneously (leach-fill). Therefore, A.J. Russo developed SANSMIC in the early 1980s which allows for a transient oil-brine interface (OBI) making it possible to model leach-fill and withdrawal operations. As the majority of caverns are currently filled to storage capacity, the primary uses of SANSMIC at this time are related to the effects of small and large withdrawals, expansion of existing caverns, and projecting future pillar to diameter ratios. SANSMIC was identified by SNL as a priority candidate for qualification. This report continues the quality assurance (QA) process by documenting the "as built" mathematical and numerical models that comprise this document. The pro- gram flow is outlined and the models are discussed in detail. Code features that were added later or were not documented previously have been expounded. No changes in the code's physics have occurred since the original documentation (Russo, 1981, 1983) although recent experiments may yield improvements to the temperature and plume methods in the future.

  11. Qualification test of a main coolant pump for SMART pilot

    International Nuclear Information System (INIS)

    Park, Sang Jin; Yoon, Eui Soo; Oh, Hyong Woo

    2006-01-01

    SMART Pilot is a multipurpose small capacity integral type reactor. Main Coolant Pump (MCP) of SMART Pilot is a canned-motor-type axial pump to circulate the primary coolant between nuclear fuel and steam generator in the primary system. The reactor is designed to operate under condition of 310 .deg. C and 14.7 MPa. Thus MCP has to be tested under same operating condition as reactor design condition to verify its performance and safety. In present work, a test apparatus to simulate real operating situations of the reactor has been designed and constructed to test MCP. And then functional tests, performance tests, and endurance tests have been carried out upon a prototype MCP. Canned motor characteristics, homologous head/torque curves, coast-down curves, NPSH curves and life-time performance variations were obtained from the qualification test as well as hydraulic performance characteristics of MCP

  12. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  13. Qualification criteria for persons responsible for radiation protection

    International Nuclear Information System (INIS)

    Wehner, G

    1980-01-01

    A survey of the qualification criteria included in the German atomic law (Atomic Energy Act, Radiological Protection Ordinance and X-ray Protection Ordinance) for persons responsible for radiation protection is given. Especially the various activities for which a health physics officer is required, the range of qualification in each case and the way the qualification has to be proved, are pointed out. Also the different guides that are issued to complete the legal requirements are mentioned. The definitions of the term qualification for health physics given in the different guides are cited and it is shown, that the qualification of a healt physics officer has to be based on the three criteria (I) vocational training. (II) professional experience and (III) the necessary knowledge in radiation protection. (orig./HP) [de

  14. The use of an automated flight test management system in the development of a rapid-prototyping flight research facility

    Science.gov (United States)

    Duke, Eugene L.; Hewett, Marle D.; Brumbaugh, Randal W.; Tartt, David M.; Antoniewicz, Robert F.; Agarwal, Arvind K.

    1988-01-01

    An automated flight test management system (ATMS) and its use to develop a rapid-prototyping flight research facility for artificial intelligence (AI) based flight systems concepts are described. The ATMS provides a flight test engineer with a set of tools that assist in flight planning and simulation. This system will be capable of controlling an aircraft during the flight test by performing closed-loop guidance functions, range management, and maneuver-quality monitoring. The rapid-prototyping flight research facility is being developed at the Dryden Flight Research Facility of the NASA Ames Research Center (Ames-Dryden) to provide early flight assessment of emerging AI technology. The facility is being developed as one element of the aircraft automation program which focuses on the qualification and validation of embedded real-time AI-based systems.

  15. Architectures of prototypes and architectural prototyping

    DEFF Research Database (Denmark)

    Hansen, Klaus Marius; Christensen, Michael; Sandvad, Elmer

    1998-01-01

    together as a team, but developed a prototype that more than fulfilled the expectations of the shipping company. The prototype should: - complete the first major phase within 10 weeks, - be highly vertical illustrating future work practice, - continuously live up to new requirements from prototyping......This paper reports from experience obtained through development of a prototype of a global customer service system in a project involving a large shipping company and a university research group. The research group had no previous knowledge of the complex business of shipping and had never worked...... sessions with users, - evolve over a long period of time to contain more functionality - allow for 6-7 developers working intensively in parallel. Explicit focus on the software architecture and letting the architecture evolve with the prototype played a major role in resolving these conflicting...

  16. Collaborative Prototyping

    DEFF Research Database (Denmark)

    Bogers, Marcel; Horst, Willem

    2014-01-01

    of the prototyping process, the actual prototype was used as a tool for communication or development, thus serving as a platform for the cross-fertilization of knowledge. In this way, collaborative prototyping leads to a better balance between functionality and usability; it translates usability problems into design......This paper presents an inductive study that shows how collaborative prototyping across functional, hierarchical, and organizational boundaries can improve the overall prototyping process. Our combined action research and case study approach provides new insights into how collaborative prototyping...... can provide a platform for prototype-driven problem solving in early new product development (NPD). Our findings have important implications for how to facilitate multistakeholder collaboration in prototyping and problem solving, and more generally for how to organize collaborative and open innovation...

  17. 26 CFR 301.6104(a)-3 - Public inspection of Internal Revenue Service letters and documents relating to pension and other...

    Science.gov (United States)

    2010-04-01

    ... letters and documents relating to pension and other plans. 301.6104(a)-3 Section 301.6104(a)-3 Internal... of Internal Revenue Service letters and documents relating to pension and other plans. (a) In general... qualification of a pension, profit-sharing or stock bonus plan under section 401(a), an annuity plan under...

  18. PERANCANGAN PROTOTYPE APLIKASI KNOWLEDGE MANAGEMENT PADA DIVISI MANAGEMENT AUTOMATION INFORMATION UNTUK MENDUKUNG ORACLE FINANCIAL PADA ORANG TUA GROUP

    Directory of Open Access Journals (Sweden)

    Gema Gema

    2010-10-01

    Full Text Available The purpose of this project is to design a knowledge management application as a media to document knowledge and facility that supported a knowledge sharing culture in Oracle Financial subdivision in Orang Tua Group. The researcher uses 7 first steps method which defined by Tiwana in doing knowledge management application prototype. The knowledge management prototype application modules consist of Wiki page, document library, discussion board, blog, picture library, knowledge base, help desk, frequently asked questions, and surveys. In using knowledge in knowledge base, user will get knowledge through business process, how to use the application, or how to finish some cases. Knowledge management prototype application design as a whole could fulfill user’s needs in sharing knowledge, but still needs continuous improvement for maximal usage.Keywords: prototype design, knowledge management application, knowledge

  19. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  20. Solar array qualification through qualified analysis

    Science.gov (United States)

    Zijdemans, J.; Cruijssen, H. J.; Wijker, J. J.

    1991-04-01

    To achieve qualification is in general a very expensive exercise. For solar arrays this is done by a dedicated test program through which final qualification is achieved. Due to severe competition on the solar array market, cheaper means are looked for to achieve a qualified product for the customers. One of the methods is to drastically limit the environmental test program and to qualify the solar-array structure against its environmental loads by analysis. Qualification by analysis is possible. The benefits are that a significant amount of development effort can be saved in case such a powerful tool is available. Extensive testing can be avoided thus saving time and money.

  1. Implementation plans for the Korean certified tumor registrar qualification system.

    Science.gov (United States)

    Boo, Yoo-Kyung; Lim, Hyun-Sook; Won, Young-Joo

    2014-01-01

    Cancer registration data is used to understand the nation's cancer burden, and to provide significant baseline data for cancer control efforts, as well as, research on cancer incidence, mortality, survival, and prevalence. A system that approves, assesses, and manages the qualification of specialists, responsible for performing cancer registration, has not been developed in Korea. This study presents ways to implement a certification system designed for the qualification of tumor registrars in Korea. Requirements for implementing a certified tumor registrar qualification system were determined by reviewing the system for establishing qualifications in Korea and the American qualification system via the National Cancer Registrars Association (NCRA). Moreover, a survey was conducted on Korean medical records administrators, who had taken the U.S. Certified Tumor Registrar (CTR) examination, in order to review their opinions regarding these requirements. This study verified the feasibility of a qualification examination based on the opinions of CTR specialists by determining the following: items, and the associated ratings, of the qualifications necessary to register individuals as certified tumor registrars in a private qualification system; status of human resources required for the examination or training processes; plans regarding the organization needed for management, and operation of qualifications, examination standards, subject areas, examination methods, examination qualifications, or education and training programs. The implementation of a certified tumor registrar qualification system will lead to enhanced job competency for specialists and a qualitative improvement of cancer registration data. It will also reliably foster human resources that will lay the groundwork needed to establish scientific and reasonable national cancer management policies.

  2. Rethink! prototyping transdisciplinary concepts of prototyping

    CERN Document Server

    Nagy, Emilia; Stark, Rainer

    2016-01-01

    In this book, the authors describe the findings derived from interaction and cooperation between scientific actors employing diverse practices. They reflect on distinct prototyping concepts and examine the transformation of development culture in their fusion to hybrid approaches and solutions. The products of tomorrow are going to be multifunctional, interactive systems – and already are to some degree today. Collaboration across multiple disciplines is the only way to grasp their complexity in design concepts. This underscores the importance of reconsidering the prototyping process for the development of these systems, particularly in transdisciplinary research teams. “Rethinking Prototyping – new hybrid concepts for prototyping” was a transdisciplinary project that took up this challenge. The aim of this programmatic rethinking was to come up with a general concept of prototyping by combining innovative prototyping concepts, which had been researched and developed in three sub-projects: “Hybrid P...

  3. Aiding the Interpretation of Ancient Documents

    DEFF Research Database (Denmark)

    Roued-Cunliffe, Henriette

    How can Decision Support System (DSS) software aid the interpretation process involved in the reading of ancient documents? This paper discusses the development of a DSS prototype for the reading of ancient texts. In this context the term ‘ancient documents’ is used to describe mainly Greek...... tool it is important first to comprehend the interpretation process involved in reading ancient documents. This is not a linear process but rather a recursive process where the scholar moves between different levels of reading, such as ‘understanding the meaning of a character’ or ‘understanding...

  4. Guidelines for training and qualification of radiological protection technicians

    International Nuclear Information System (INIS)

    1987-08-01

    guidelines and plant-specific needs should provide assurance that individuals successfully completing the programs will be able to perform their jobs competently. It is recognized, however, that successful programs can be developed without strict adherence to each guideline recommendation. INPO welcomes suggestions for improving these guidelines as member utilities gain experience in their use. These guidelines supersede INPO 82-006, Radiological Protection Technician Qualification Programs. Due to extensive changes, side barring was not used in this document

  5. Romanian-Canadian joint program for qualification of FCN as a CANDU fuel supplier

    International Nuclear Information System (INIS)

    Galeriu, C.A.; Andrei, G.; Bailescu, A.

    1995-01-01

    RENEL (Romania Power Authority), the co-ordinator of Romanian Nuclear Program, have decided to improve, starting 1990 the existing capability to produce CANDU nuclear fuel at FCN Pitesti. The objective of the program was defined with AAC (AECL - ANSALDO Consortium) for the qualification of FCN fuel plant according to Canadian Z299.2 standard. The Qualification Program was performed under AAC Work Order C-003. The co-ordination was assumed by AECL, as overall Design Authority. ZPI (Zircatec Precision Industries Inc., Canada), were designated to supply technical assistance, equipments and know how where necessary. After a preliminary verification of the FCN fuel plant, including the processes and system investigation, performed under AECL and ZPI assistance, the Qualification Program was defined in all details. The upgrading of documentation on all aspects required by Z299.2 was performed. Few processes needed to be reconsidered and equipment was delivered by ZPI or other suppliers. This includes mainly welding equipments and special inspection equipments. Health Physics was practically fully reconsidered. New equipment and practice were adapted to provide adequate control on health conditions. Every manufacturing and inspection process was checked to determine their performance during a Qualification Run based on acceptance criteria which have been established in the Qualification Plan. Manufacturing Demonstration Run was an important step to prove that all plant functions have been accomplished during the fabrication of 200 fuel bundles. These bundles have been fully accepted and 66 of them have been loaded in the first charge of Unit 1 Cemavoda NPS. The surveillance and audit actions made by AECL and ZPI during this period confirmed the FCN capability to operate an adequate system meeting the to required quality assurance standard. The very open attitude of AECL, Zircatec and FCN staff have stimulated the progress of the project and a successful achievement of the

  6. Data Qualification Report: Calculated Porosity and Porosity-Derived Values for Lithostratigraphic Units for use on the Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    P. Sanchez

    2001-05-30

    The qualification is being completed in accordance with the Data Qualification Plan DQP-NBS-GS-000006, Rev. 00 (CRWMS M&O 2001). The purpose of this data qualification activity is to evaluate for qualification the unqualified developed input and porosity output included in Data Tracking Number (DTN) M09910POROCALC.000. The main output of the analyses documented in DTN M09910POROCALC.000 is the calculated total porosity and effective porosity for 40 Yucca Mountain Project boreholes. The porosity data are used as input to Analysis Model Report (AMR) 10040, ''Rock Properties Model'' (MDL-NBS-GS-000004, Rev. 00), Interim Change Notice [ICN] 02 (CRWMS M&O 2000b). The output from the rock properties model is used as input to numerical physical-process modeling within the context of a relationship developed in the AMR between hydraulic conductivity, bound water and zeolitic zones for use in the unsaturated zone model. In accordance with procedure AP-3.15Q, the porosity output is not used in the direct calculation of Principal Factors for post-closure safety or disruptive events. The original source for DTN M09910POROCALC.000 is a Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M&O) report, ''Combined Porosity from Geophysical Logs'' (CRWMS M&O 1999a and hereafter referred to as Rael 1999). That report recalculated porosity results for both the historical boreholes covered in Nelson (1996), and the modern boreholes reported in CRWMS M&O (1996a,b). The porosity computations in Rael (1999) are based on density-porosity mathematical relationships requiring various input parameters, including bulk density, matrix density and air and/or fluid density and volumetric water content. The main output is computed total porosity and effective porosity reported on a foot-by-foot basis for each borehole, although volumetric water content is derived from neutron data as an interim output. This qualification

  7. Data Qualification Report: Calculated Porosity and Porosity-Derived Values for Lithostratigraphic Units for use on the Yucca Mountain Project

    International Nuclear Information System (INIS)

    P. Sanchez

    2001-01-01

    The qualification is being completed in accordance with the Data Qualification Plan DQP-NBS-GS-000006, Rev. 00 (CRWMS M and O 2001). The purpose of this data qualification activity is to evaluate for qualification the unqualified developed input and porosity output included in Data Tracking Number (DTN) M09910POROCALC.000. The main output of the analyses documented in DTN M09910POROCALC.000 is the calculated total porosity and effective porosity for 40 Yucca Mountain Project boreholes. The porosity data are used as input to Analysis Model Report (AMR) 10040, ''Rock Properties Model'' (MDL-NBS-GS-000004, Rev. 00), Interim Change Notice [ICN] 02 (CRWMS M and O 2000b). The output from the rock properties model is used as input to numerical physical-process modeling within the context of a relationship developed in the AMR between hydraulic conductivity, bound water and zeolitic zones for use in the unsaturated zone model. In accordance with procedure AP-3.15Q, the porosity output is not used in the direct calculation of Principal Factors for post-closure safety or disruptive events. The original source for DTN M09910POROCALC.000 is a Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) report, ''Combined Porosity from Geophysical Logs'' (CRWMS M and O 1999a and hereafter referred to as Rael 1999). That report recalculated porosity results for both the historical boreholes covered in Nelson (1996), and the modern boreholes reported in CRWMS M and O (1996a,b). The porosity computations in Rael (1999) are based on density-porosity mathematical relationships requiring various input parameters, including bulk density, matrix density and air and/or fluid density and volumetric water content. The main output is computed total porosity and effective porosity reported on a foot-by-foot basis for each borehole, although volumetric water content is derived from neutron data as an interim output. This qualification report uses

  8. Approach to customer qualification of the BNFL Sellafield Mox Plant

    International Nuclear Information System (INIS)

    Sullivan, P.

    2003-01-01

    BNFL started plutonium commissioning of its Sellafield MOX Plant (SMP) in December 2001, with the first MOX pellets being produced in May 2002. SMP was designed to manufacture a range of both PWR and BWR fuel types for a number of different customers. During commissioning and early MOX fuel manufacturing BNFL has been demonstrating its ability to both automatically manufacture and inspect MOX fuel to meet the requirements of different customers' specifications and fuel types. The qualification project consisted of common and project specific qualification. Common qualification was carried out to demonstrate BNFL could meet several customers' requirements during the same qualification test. Project specific qualification was carried out for one customer only as the fabrication or inspection equipment was specific to their fuel type. An example is the fuel assembly process. The reasons for BNFL carrying out common qualification were: - Develop a common qualified process to meet different customer specifications. - Minimise future qualifications prior to starting future fuel campaigns. - Ensure BNFL understands and effectively manages different customer requirements in SMP. BNFL has approached qualification of SMP systematically. Firstly the inspection system was qualified, and once completed the inspection system was then used in the qualification of the manufacturing process. (orig.)

  9. 49 CFR 214.351 - Training and qualification of flagmen.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification of flagmen. 214.351... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.351 Training and qualification of flagmen. (a) The training and qualification for roadway workers assigned the...

  10. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 9 discusses the following topics: Integrated System Normal Operations Test Results and Analysis Report; Integrated System Off-Normal Operations Test Results and Analysis Report; and Integrated System Maintenance Operations Test Results and Analysis Report

  11. Prototypical Rod Construction Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report

  12. Prototype road weather performance management (RWPM) tool installation instructions & user manual.

    Science.gov (United States)

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  13. Bechtel automated control of design document data

    International Nuclear Information System (INIS)

    Hollingshaus, H.

    1986-01-01

    Concern for nuclear power plant safety has resulted in many design features that complicate the licensing, operation, and maintenance of nuclear plants. To manage and control the design effectively, Bechtel has developed an integrated design document data base that provides efficient support of the plant during all phases of its life. The program runs on the IBM System 38, but can also be downloaded to an IBM PC to save storage and connect time. It is interactive and can accommodate multiple users at various locations. Although primarily developed to manage design changes resulting from the regulatory process and use of a fast track construction schedule, the data base will provide operations and maintenance personnel with qualifications status and pertinent data for each piece of equipment, including all electrical devices and a list of all associated design documents

  14. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1994-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  15. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1993-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  16. Safety review for seismic qualification on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Fang Qingxian

    1995-01-01

    The standards and requirements for seismic qualification of nuclear power plant's component have been fully addressed, including the scope of seismic qualification, the approach and the method of common seismic qualification, the procedure of the seismic tests, and the criteria for the seismic qualification review. The problems discovered in the safety review and the solution for these problems and some other issues are also discussed

  17. Transitioning Existing Content: inferring organisation-specific documents

    Directory of Open Access Journals (Sweden)

    Arijit Sengupta

    2000-11-01

    Full Text Available A definition for a document type within an organization represents an organizational norm about the way the organizational actors represent products and supporting evidence of organizational processes. Generating a good organization-specific document structure is, therefore, important since it can capture a shared understanding among the organizational actors about how certain business processes should be performed. Current tools that generate document type definitions focus on the underlying technology, emphasizing tags created in a single instance document. The tools, thus, fall short of capturing the shared understanding between organizational actors about how a given document type should be represented. We propose a method for inferring organization-specific document structures using multiple instance documents as inputs. The method consists of heuristics that combine individual document definitions, which may have been compiled using standard algorithms. We propose a number of heuristics utilizing artificial intelligence and natural language processing techniques. As the research progresses, the heuristics will be tested on a suite of test cases representing multiple instance documents for different document types. The complete methodology will be implemented as a research prototype

  18. Advances and highlights of the CNEA qualification program as high density fuel manufacturer for research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Adelfang, P.; Alvarez, L.; Boero, N.; Calabrese, R.; Echenique, P.; Markiewicz, M.; Pasqualini, E.; Ruggirello, G.; Taboada, H. [Unidad de Actividad Combustibles Nucleares Comision Nacional de Energia Atomica (CNE4), Avda. del Libertador, 8250 C1429BNO Buenos Aires (Argentina)

    2002-07-01

    One of the main objectives of CNEA regarding the fuel for research reactors is the development and qualification of the manufacturing of LEU high-density fuels. The qualification programs for both types of fuels, Silicide fuel and U- x Mo fuel, are similar. They include the following activities: development and set up of the fissile compound manufacturing technology, set up of fuel plate manufacturing, fabrication and irradiation of mini plates and plates, design and fabrication of fuel assembly prototypes for irradiation, post-irradiation examination and feedback for manufacturing improvements. This paper describes the different activities performed within each program during the last year and the main advances and achievements of the programs within this period. The main achievements may be summarized in the following activities: Continuation of the irradiation of the first silicide fuel element in the R A3. Completion of the manufacturing of the second silicide fuel element, licensing and beginning of its irradiation in the R A3. Development of the HMD Process to manufacture U-Mo powder (pUMA project). Set up of fuel plates manufacturing at industrial level using U-Mo powder. Preliminary studies and the design for the irradiation of mini plates, plates and full scale fuel elements with U-Mo and 7 g U/cm{sup 3}. PIE destructive studies for the P-04 silicide fuel prototype (accurate burnup determination through chemical analysis, metallography and SEM of samples from the irradiated fuel plates). Improvement and development of new characterization techniques for high density fuel plates quality control including US testing and densitometric analysis of X-ray examinations. The results obtained in this period are encouraging and also allow to foresee a wider participation of CNEA in the international effort to qualify U-Mo as a new material for the manufacturing of research reactor fuels. (author)

  19. Advances and highlights of the CNEA qualification program as high density fuel manufacturer for research reactors

    International Nuclear Information System (INIS)

    Adelfang, P.; Alvarez, L.; Boero, N.; Calabrese, R.; Echenique, P.; Markiewicz, M.; Pasqualini, E.; Ruggirello, G.; Taboada, H.

    2002-01-01

    One of the main objectives of CNEA regarding the fuel for research reactors is the development and qualification of the manufacturing of LEU high-density fuels. The qualification programs for both types of fuels, Silicide fuel and U- x Mo fuel, are similar. They include the following activities: development and set up of the fissile compound manufacturing technology, set up of fuel plate manufacturing, fabrication and irradiation of mini plates and plates, design and fabrication of fuel assembly prototypes for irradiation, post-irradiation examination and feedback for manufacturing improvements. This paper describes the different activities performed within each program during the last year and the main advances and achievements of the programs within this period. The main achievements may be summarized in the following activities: Continuation of the irradiation of the first silicide fuel element in the R A3. Completion of the manufacturing of the second silicide fuel element, licensing and beginning of its irradiation in the R A3. Development of the HMD Process to manufacture U-Mo powder (pUMA project). Set up of fuel plates manufacturing at industrial level using U-Mo powder. Preliminary studies and the design for the irradiation of mini plates, plates and full scale fuel elements with U-Mo and 7 g U/cm 3 . PIE destructive studies for the P-04 silicide fuel prototype (accurate burnup determination through chemical analysis, metallography and SEM of samples from the irradiated fuel plates). Improvement and development of new characterization techniques for high density fuel plates quality control including US testing and densitometric analysis of X-ray examinations. The results obtained in this period are encouraging and also allow to foresee a wider participation of CNEA in the international effort to qualify U-Mo as a new material for the manufacturing of research reactor fuels. (author)

  20. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

    to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... preferences, recipients should not respond to the applicant actually hired on the basis of their (the recipients') racial preferences. My account decomposes the meritocratic ideal into four separate norms, one of which applies to recipients rather than to selectors. Finally, it defends the view that reaction...... qualifications based on antimeritocratic reactions, while not unproblematic, are not entirely irrelevant from the point of view of merit. Notably, selectors need not discount them when no one - including the targets of the objectionable preferences - is unfairly disadvantaged. Because not all problematic...

  1. QUALIFICATIONS FRAMEWORKS FOR LIFELONG LEARNING CONQUERING THE WORLD?

    Directory of Open Access Journals (Sweden)

    Arjen Deij

    2014-01-01

    Full Text Available The paper reveals the international prospects of developing and spreading the qualifications frameworks across the globe. It introduces the key terms and concepts related to the given issue, and examines both the benefits and challenges of qualifications frameworks implementation. The author looks into the origins and causes of the worldwide interest in qualifications framework application, and gives the overview of related recent publications and their conclusions to reinforce the provided argumentation.

  2. Qualification of safety-related valve actuators

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This Standard describes the qualification of all types of power-driven valve actuators, including damper actuators, for safety-related functions in nuclear power generating stations. It may also be used to separately qualify actuator components. This Standard establishes the minimum requirements for, and guidance regarding, the methods and procedures for qualification of all safety-related functions of power-driven valve actuators

  3. Summary of work completed under the Environmental and Dynamic Equipment Qualification research program (EDQP)

    International Nuclear Information System (INIS)

    Steele, R. Jr.; Bramwell, D.L.; Watkins, J.C.; DeWall, K.G.

    1994-02-01

    This report documents the results of the main projects undertaken under the Environmental and Dynamic Equipment Qualification Research Program (EDQP) sponsored by the U.S. Nuclear Regulatory Commission (NRC) under FIN A6322. Lasting from fiscal year 1983 to 1987, the program dealt with environmental and dynamic (including seismic) equipment qualification issues for mechanical and electromechanical components and systems used in nuclear power plants. The research results have since been used by both the NRC and industry. The program included seven major research projects that addressed the following issues: (a) containment purge and vent valves performing under design basis loss of coolant accident loads, (b) containment piping penetrations and isolation valves performing under seismic loadings and design basis and severe accident containment wall displacements, (c) shaft seals for primary coolant pumps performing under station blackout conditions, (d) electrical cabinet internals responding to in-structure generated motion (rattling), and (e) in situ piping and valves responding to seismic loadings. Another project investigating whether certain containment isolation valves will close under design basis conditions was also started under this program. This report includes eight main section, each of which provides a brief description of one of the projects, a summary of the findings, and an overview of the application of the results. A bibliography lists the journal articles, papers, and reports that document the research

  4. Qualification of software and hardware

    International Nuclear Information System (INIS)

    Gossner, S.; Schueller, H.; Gloee, G.

    1987-01-01

    The qualification of on-line process control equipment is subdivided into three areas: 1) materials and structural elements; 2) on-line process-control components and devices; 3) electrical systems (reactor protection and confinement system). Microprocessor-aided process-control equipment are difficult to verify for failure-free function owing to the complexity of the functional structures of the hardware and to the variety of the software feasible for microprocessors. Hence, qualification will make great demands on the inspecting expert. (DG) [de

  5. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  6. Strategy for Qualification of the Plutonium Immobilized Form

    International Nuclear Information System (INIS)

    Marra, J.C.; Marra, S.L.; Bibler, N.E.; Strachan, D.M.; Shaw, H.F.

    1998-01-01

    In order to dispose of a radioactive waste form in a federal high- level waste repository, a waste form qualification strategy and program must be developed. The waste form qualification program must include the acceptance specifications for the product, show how compliance with these specifications will be met, and then demonstrate compliance. An important element of this program is developing a measure to demonstrate product consistency. For the can- in-canister option, waste form qualification is needed not only for the Pu immobilized form but also for the high-level waste glass canister containing the Pu waste form. The latter will require close interaction and coordination with the U.S. Department of Energy - Office of Environmental Management (DOE-EM) who, through their contractor at the Savannah River Site (SRS), is the producer of the high-level waste form at the Defense Waste Processing Facility (DWPF). In this paper a waste form qualification strategy for the plutonium ceramic form is described that utilizes, as much as possible, the qualification strategy successfully used for vitrified high-level waste

  7. Nightshade Prototype Experiments (Silverleaf)

    Energy Technology Data Exchange (ETDEWEB)

    Danielson, Jeremy [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Bauer, Amy L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-23

    The Red Sage campaign is a series of subcritical dynamic plutonium experiments designed to measure ejecta. Nightshade, the first experiments in Red Sage scheduled for fiscal year 2019, will measure the amount of ejecta emission into vacuum from a double-­shocked plutonium surface. To address the major technical risks in Nightshade, a Level 2 milestone was developed for fiscal year 2016. Silverleaf, a series of four experiments, was executed at the Los Alamos National Laboratory in July and August 2016 to demonstrate a prototype of the Nightshade package and to satisfy this Level 2 milestone. This report is documentation that Red Sage Level 2 milestone requirements were successfully met.

  8. Results of initial analyses of the salt (macro) batch 11 Tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-10-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Interim Salt Disposition Project (ISDP) Salt (Macro) Batch 11 for processing through the Actinide Removal Process (ARP) and the Modular Caustic-Side Solvent Extraction Unit (MCU). This document reports the initial results of the analyses of samples of Tank 21H. Analysis of the Tank 21H Salt (Macro) Batch 11 composite sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This memo satisfies part of Deliverable 3 of the Technical Task Request (TTR).

  9. Restart Plan for the Prototype Vertical Denitration Calciner [SD Coversheet has Incorrect Document Number

    Energy Technology Data Exchange (ETDEWEB)

    SUTTER, C.S.

    1999-07-26

    Testing activities on the Prototype Vertical Denitration Calciner at PFP were suspended in January 1997 due to the hold on fissile material handling in the facility. The Restart Plan will govern the transition of the test program from the completion of the activity based startup review; through equipment checkout and surrogate material runs; to resumption of the testing program and transition to unrestricted testing.

  10. Qualification of safety-critical software for digital reactor safety system in nuclear power plants

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Park, Gee-Yong; Kim, Jang-Yeol; Lee, Jang-Soo

    2013-01-01

    This paper describes the software qualification activities for the safety-critical software of the digital reactor safety system in nuclear power plants. The main activities of the software qualification processes are the preparation of software planning documentations, verification and validation (V and V) of the software requirements specifications (SRS), software design specifications (SDS) and codes, and the testing of the integrated software and integrated system. Moreover, the software safety analysis and software configuration management are involved in the software qualification processes. The V and V procedure for SRS and SDS contains a technical evaluation, licensing suitability evaluation, inspection and traceability analysis, formal verification, software safety analysis, and an evaluation of the software configuration management. The V and V processes for the code are a traceability analysis, source code inspection, test case and test procedure generation. Testing is the major V and V activity of the software integration and system integration phases. The software safety analysis employs a hazard operability method and software fault tree analysis. The software configuration management in each software life cycle is performed by the use of a nuclear software configuration management tool. Through these activities, we can achieve the functionality, performance, reliability, and safety that are the major V and V objectives of the safety-critical software in nuclear power plants. (author)

  11. 49 CFR 214.349 - Training and qualification of watchmen/lookouts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification of watchmen/lookouts...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.349 Training and qualification of watchmen/lookouts. (a) The training and qualification for...

  12. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Smith, A.C.

    1999-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  13. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Van Alstine, M.N.

    1998-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  14. Integrated Information System for Higher Education Qualifications

    Directory of Open Access Journals (Sweden)

    Catalin Ionut SILVESTRU

    2012-10-01

    Full Text Available In the present article we aim to study thoroughly and detail aspects related to architectures specific for e-learning and management of human resources training interconnected to management of qualifications. In addition, we take into consideration combining e-learning architectures with software in an e-learning system interconnected with the National Registry of Qualifications of Higher Education, in view of developing and information system that correlates educational supply from higher education from Romania with labor market demands through qualifications. The scientific endeavor consists of original architectural solutions to integrate data, systems, processes, services from various sources and to use them in the proposed system. The practical result of the scientific endeavor is represented by design of architectures required for developing an e-learning system interconnected with the National Registry of Qualifications from Romania, which involve in first stage the qualifications provided by higher education. The proposed innovative solution consists in the fact that the proposed information system combines the advantages of content management system (CMS with learning content management system (LCMS and with reusable learning objects (RLO. Thus, the architecture proposed in the research ensures the integration of a content management system with a portal for information, guidance and support in making a professional project. The integration enables correlation of competences with content areas and specific items from various teaching subjects, thus evaluating the usefulness for this registry from learning/educational perspective. Using the proposed information system in enables correlation among qualifications, content of educational program and continuous self-evaluation opportunities, which facilitate monitoring of progress and adjustment of learning content.

  15. Developing competence based qualification system in the nuclear energy sector

    International Nuclear Information System (INIS)

    Ceclan, Mihail

    2016-01-01

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  16. Developing competence based qualification system in the nuclear energy sector

    Energy Technology Data Exchange (ETDEWEB)

    Ceclan, Mihail [European Commission, Petten (Netherlands). Inst. for Energy and Transport

    2016-04-15

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  17. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  18. Internal qualification and credentialing of radiation oncology physicists to perform patient special procedures

    Directory of Open Access Journals (Sweden)

    Michael D Mills

    2014-01-01

    Full Text Available In the arena of radiation oncology special procedures, medical physicists are often the focus professionals for implementation and administration of advanced and complex technologies. One of the most vexing and challenging aspects of managing complexity concerns the ongoing internal qualification and credentialing of radiation oncology physicists to perform patient special procedures. To demonstrate ongoing qualification, a physicist must a document initial training and successful completion of competencies to implement and perform this procedure, b demonstrate familiarity with all aspects of the commissioning and quality assurance process, c demonstrate continuing education respecting this procedure, d demonstrate the peer-reviewed completion of a minimum number of patient special procedures during a specified time span, and e demonstrate satisfactory overall progress toward maintenance of specialty board certification. In many respects, this information complement is similar to that required by an accredited residency program in therapy physics. In this investigation, we report on the design of a management tool to qualify staff radiation oncology physicists to deliver patient procedures.

  19. 10 CFR 50.76 - Licensee's change of status; financial qualifications.

    Science.gov (United States)

    2010-01-01

    ... the financial qualifications information that would be required for obtaining an initial operating license as specified in § 50.33(f)(2). The financial qualifications information must address the first... 10 Energy 1 2010-01-01 2010-01-01 false Licensee's change of status; financial qualifications. 50...

  20. A decision support system for the reading of ancient documents

    DEFF Research Database (Denmark)

    Roued-Cunliffe, Henriette

    2011-01-01

    The research presented in this thesis is based in the Humanities discipline of Ancient History and begins by attempting to understand the interpretation process involved in reading ancient documents and how this process can be aided by computer systems such as Decision Support Systems (DSS...... this process in the five areas: remembering complex reasoning, searching huge datasets, international collaboration, publishing editions, and image enhancement. This research contains a large practical element involving the development of a DSS prototype. The prototype is used to illustrate how a DSS......, by remembering complex reasoning, can aid the process of interpretation that is reading ancient documents. It is based on the idea that the interpretation process goes through a network of interpretation. The network of interpretation illustrates a recursive process where scholars move between reading levels...

  1. Test report: Electron-proton spectrometer qualification test unit, qualification test

    Science.gov (United States)

    Vincent, D. L.

    1972-01-01

    Qualification tests of the electron-proton spectrometer test unit are presented. The tests conducted were: (1) functional, (2) thermal/vacuum, (3) electromagnetic interference, (4) acoustic, (5) shock, (6) vibration, and (7) humidity. Results of each type of test are presented in the form of data sheets.

  2. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report

  3. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 5 discusses the following topics: Lower Cutting System Test Results and Analysis Report; NFBC Loading System Test Results and Analysis Report; Robotic Bridge Transporter Test Results and Analysis Report; RM-10A Remotec Manipulator Test Results and Analysis Report; and Manipulator Transporter Test Results and Analysis Report

  4. Ministerial Decree of 1 March 1973. Approval of the models of documents concerning the professional qualifications for the management and operation of nuclear installations

    International Nuclear Information System (INIS)

    1973-01-01

    This Decree by the Ministry of Labour implements Section 36 of DPR No. 1450 of 30 December 1970 (Regulations concerning the qualifications for technical operation of nuclear installations) made under Act no. 1860. (NEA) [fr

  5. Architectural prototyping

    DEFF Research Database (Denmark)

    Bardram, Jakob Eyvind; Christensen, Henrik Bærbak; Hansen, Klaus Marius

    2004-01-01

    A major part of software architecture design is learning how specific architectural designs balance the concerns of stakeholders. We explore the notion of "architectural prototypes", correspondingly architectural prototyping, as a means of using executable prototypes to investigate stakeholders...

  6. Program plan for environmental qualification of mechanical and dynamic (including seismic) qualification of mechanical and electrical equipment program (EDQP)

    International Nuclear Information System (INIS)

    Weidenhamer, G.H.

    1986-06-01

    The equipment qualification program described in this plan is intended to provide the technical basis for resolving uncertainties in existing equipment qualification standards. In addition, research results are contributing to the resolution of safety issues GI-23, GI-87, USI-A44, titled, ''Reactor Coolant Pump Seal Failure,'' ''Failure of HPCI Steam Line Without Isolation,'' and ''Station Blackout,'' respectively. Also, research effort is being directed at providing information on the behavior of containment isolation valves under severe accident environments. Although the results of the latter research will not contribute to resolving uncertainties in qualification standards, it has proven cost effective to obtain this information under this program

  7. Prototyping the DARPA Image Understanding Environment and Tools to Facilitate Its Use

    National Research Council Canada - National Science Library

    Lawton, Daryl

    1998-01-01

    ...) and Tools to Facilitate Its Use. The major objectives of this project are to support the design and development of the IUE, to prototype the IUE user interface and data exploration tools, and to develop tools for documentation...

  8. Fiber Laser Component Testing for Space Qualification Protocol Development

    Science.gov (United States)

    Falvey, S.; Buelow, M.; Nelson, B.; Starcher, Y.; Thienel, L.; Rhodes, C.; Tull, Jackson; Drape, T.; Westfall, C.

    A test protocol for the space qualifying of Ytterbium-doped diode-pumped fiber laser (DPFL) components was developed under the Bright Light effort, sponsored by AFRL/VSE. A literature search was performed and summarized in an AMOS 2005 conference paper that formed the building blocks for the development of the test protocol. The test protocol was developed from the experience of the Bright Light team, the information in the literature search, and the results of a study of the Telcordia standards. Based on this protocol developed, test procedures and acceptance criteria for a series of vibration, thermal/vacuum, and radiation exposure tests were developed for selected fiber laser components. Northrop Grumman led the effort in vibration and thermal testing of these components at the Aerospace Engineering Facility on Kirtland Air Force Base, NM. The results of the tests conducted have been evaluated. This paper discusses the vibration and thermal testing that was executed to validate the test protocol. The lessons learned will aid in future assessments and definition of space qualification protocols. Components representative of major items within a Ytterbium-doped diode-pumped fiber laser were selected for testing; including fibers, isolators, combiners, fiber Bragg gratings, and laser diodes. Selection of the components was based on guidelines to test multiple models of typical fiber laser components. A goal of the effort was to test two models (i.e. different manufacturers) of each type of article selected, representing different technologies for the same type of device. The test articles did not include subsystems or systems. These components and parts may not be available commercial-off-the-shelf (COTS), and, in fact, many are custom articles, or newly developed by the manufacturer. The primary goal for this effort is a completed taxonomy that lists all relevant laser components, modules, subsystems, and interfaces, and cites the documentation for space

  9. T25 Qualification of old containers

    International Nuclear Information System (INIS)

    Hoerning, T.; Kasparek, E.M.; Voelzke, H.

    2013-01-01

    Radioactive waste for final disposal in the repository Konrad has to be packaged in licensed containers. The qualification of containers is performed according the respective standards and BfS requirements. The latter ones differ for different container types with respect to accident resistance based on the release behavior of the waste. Usually qualification of container types is performed before series production. The qualification of already produced containers (''old containers'') is significantly more complicated. The differences of quality assurance and materials properties of the older containers have to be evaluated. A main tool for this evaluation is the numerical re-calculation of accident scenarios for estimation of the safety margins. The validation of appropriate finite element models is available. Based on these date it might be possible to abandon additional drop tests with the existing old containers to prove the structural integrity.

  10. Qualification requirements and training programs for nonreactor nuclear facility personnel in the Operations Division of the Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Preston, E.L.; Culbert, W.H.; Baldwin, M.E.; McCormack, K.E.; Rivera, A.L.; Setaro, J.A.

    1985-11-01

    This document describes the program for training, retraining, and qualification of nonreactor nuclear operators in the Operations Division of the Oak Ridge National Laboratory. The objective of the program is to provide the Operators and Supervisors of nuclear facilities the knowledge and skills needed to perform assigned duties in a safe and efficient manner and to comply with US Department of Energy Order 5480.1A Chapter V. This order requires DOE nuclear facilities to maintain formal training programs for their operating staff and documentation of that training.

  11. Qualification requirements and training programs for nonreactor nuclear facility personnel in the Operations Division of the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Preston, E.L.; Culbert, W.H.; Baldwin, M.E.; McCormack, K.E.; Rivera, A.L.; Setaro, J.A.

    1985-11-01

    This document describes the program for training, retraining, and qualification of nonreactor nuclear operators in the Operations Division of the Oak Ridge National Laboratory. The objective of the program is to provide the Operators and Supervisors of nuclear facilities the knowledge and skills needed to perform assigned duties in a safe and efficient manner and to comply with US Department of Energy Order 5480.1A Chapter V. This order requires DOE nuclear facilities to maintain formal training programs for their operating staff and documentation of that training

  12. ELIMINATION OF THE CHARACTERIZATION OF DWPF POUR STREAM SAMPLE AND THE GLASS FABRICATION AND TESTING OF THE DWPF SLUDGE BATCH QUALIFICATION SAMPLE

    Energy Technology Data Exchange (ETDEWEB)

    Amoroso, J.; Peeler, D.; Edwards, T.

    2012-05-11

    A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupled operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In

  13. Elimination Of The Characterization Of DWPF Pour Stream Sample And The Glass Fabrication And Testing Of The DWPF Sludge Batch Qualification Sample

    International Nuclear Information System (INIS)

    Amoroso, J.; Peeler, D.; Edwards, T.

    2012-01-01

    A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupled operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In contrast, the

  14. A software prototype development of human system interfaces for human factors engineering validation tests of SMART MCR

    International Nuclear Information System (INIS)

    Lim, Jong Tae; Han, Kwan Ho; Yang, Seung Won

    2011-02-01

    An integrated system validation test bed used for human factors engineering validation test is being developed. This study has a goal to develop a software prototype for HFE validation of SMART MCR design. To achieve these, first, some prototype specifications of the software was developed. Then software prototypes of alarm reduction logic system, Plant Protection System, ESF-CCS, Elastic Tile Alarm Indication, and EID-based HSIs were implemented as codes. Test procedures for the software prototypes were established to verify the completeness of the codes implemented. The careful software test has been done according to these test procedures, and the result were documented

  15. Similarity principles for seismic qualification of equipment by experience data

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1989-01-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data is that available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application and verification of the procedures are given for actual test data available from previous qualifications. The developments are intended to elaborate on the rather broad guidelines by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. The results also contribute to filling a gap that exists between the IEEE 344 methodology and that which was previously developed for equipment in existing plants by the Seismic Qualification Utilities Group. 10 refs., 9 figs., 1 tab

  16. Results of a literature review on the environmental qualification of low-voltage electric cables

    International Nuclear Information System (INIS)

    Lofaro, R.; Lee, B.; Villaran, M.; Gleason, J.; Aggarwal, S.

    1995-01-01

    In the design of nuclear power plants in the US, safety-related electric equipment must be qualified to provide reasonable assurance it can withstand the effects of a design basis event (DBE) and still be able to perform its prescribed safety function, even if the accident were to occur at the end of its service life. The requirement for environmental qualification (EQ) originates from the General Design Criteria in the Code of Federal Regulations, Title 10, Part 50 (10 CFR 50). The acceptable method of performing the qualification of this equipment has evolved over the years, starting with the NRC Division of Operating Reactors (DOR) Guidelines, which were issued in Bulletin 79--01B, and NUREG-0588 requirements and ending with the current EQ Rule, 10 CFR 50.49. While the EQ methods described in these documents have the same overall objective, there are some notable differences for which a clear technical basis has not been established. One difference is the preaging requirement for equipment prior to LOCA testing. In addition, specific issues related to current EQ practices have been raised by the US NRC which need to be addressed. These issues, which are discussed in detail later in this paper, are related to the sources of conservatism and uncertainty in IEEE Standard 323--1974, which is the qualification standard currently endorsed by the NRC. To address these issues, the NRC Office of Nuclear Reactor Regulation (NRR) implemented a Task Action Plan (TAP), and the Office of Nuclear Reactor Research (RES) initiated a complementary research program. The current focus of this program is on the qualification of low-voltage instrumentation and control cables. These cables were selected since they are not typically replaced on a routine basis, and their degradation could impact plant safety

  17. IEEE recommended practices for seismic qualification of Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The IEEE has developed this document to provide direction for developing programs to seismically qualify Class 1E equipment for nuclear power generating stations. It supplements IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for equipment qualification. The Class 1E equipment to be qualified by produres or standards established by this document are of many forms, characteristics, and materials; therefore, the document presents many acceptable methods with the intent of permitting the user to make a judicious selection from among the various options. In making such a selection, the user should choose those that best meet a particular equipment's requirements. Further, in using this document as a specification for the purchase of equipment, the many options should also be recognized and the document invoked accordingly. It is recommended that the need for specific standards for the seismic qualifiction of particular kinds of equipment be evaluated by those responsible for such documents and that consideration be given to the application of particular methods from these documents which are most suitable

  18. Old dogs are great at new tricks: column stores for ir prototyping

    NARCIS (Netherlands)

    H.F. Mühleisen (Hannes); T. Samar (Thaer); J.J.P. Lin (Jimmy); A.P. de Vries (Arjen)

    2014-01-01

    htmlabstractWe make the suggestion that instead of implementing custom index structures and query evaluation algorithms, IR researchers should simply store document representations in a column-oriented relational database and implement ranking models using SQL. For rapid prototyping, this is

  19. Sludge Batch 7B Qualification Activities With SRS Tank Farm Sludge

    International Nuclear Information System (INIS)

    Pareizs, J.; Click, D.; Lambert, D.; Reboul, S.

    2011-01-01

    Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry - Sludge Batch 7b (SB7b) - be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL typically simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). With the tight schedule constraints for SB7b and the potential need for caustic addition to allow for an acceptable glass processing window, the qualification for SB7b was approached differently than past batches. For SB7b, SRNL prepared a Tank 51 and a Tank 40 sample for qualification. SRNL did not receive the qualification sample from Tank 51 nor did it simulate all of the Tank Farm washing and decanting operations. Instead, SRNL prepared a Tank 51 SB7b sample from samples of Tank 7 and Tank 51, along with a wash solution to adjust the supernatant composition to the final SB7b Tank 51 Tank Farm projections. SRNL then prepared a sample to represent SB7b in Tank 40 by combining portions of the SRNL-prepared Tank 51 SB7b sample and a Tank 40 Sludge Batch 7a (SB7a) sample. The blended sample was 71% Tank 40 (SB7a) and 29% Tank 7/Tank 51 on an insoluble solids basis. This sample is referred to as the SB7b Qualification Sample. The blend represented the highest projected Tank 40 heel (as of May 25, 2011), and thus, the highest

  20. Guidelines for Selection, Screening and Qualification of Low-Voltage Commercial Multilayer Ceramic Capacitors for Space Programs

    Science.gov (United States)

    Teverovsky, Alexander A.

    2012-01-01

    This document has been developed in the course of NASA Electronic Parts and Packaging (NEPP) program and is not an official endorsement of the insertion of commercial capacitors in space programs or an established set of requirements for their testing. The purpose of this document is to suggest possible ways for selection, screening, and qualification of commercial capacitors for NASA projects and open discussions in the parts engineering community related to the use of COTS ceramic capacitors. This guideline is applicable to commercial surface mount chip, simple parallel plate design, multi-layer ceramic capacitors (MLCCs) rated to voltages of 100V and less. Parts with different design, e.g. low inductance ceramic capacitors (LICA), land grid array (LGA) etc., might need additional testing and tailoring of the requirements described in this document. Although the focus of this document is on commercial MLCCs, many procedures discussed below would be beneficial for military-grade capacitors

  1. Design and prototyping of real-time systems using CSP and CML

    DEFF Research Database (Denmark)

    Rischel, Hans; Sun, Hong Yan

    1997-01-01

    A procedure for systematic design of event based systems is introduced by means of the Production Cell case study. The design is documented by CSP style processes, which allow both verification using formal techniques and also validation of a rapid prototype in the functional language CML...

  2. Qualification Practices in Nuclear Industry: Steam Generator Eddy Current Probe Qualification

    International Nuclear Information System (INIS)

    Vavrous, M.; Gracin, R.

    2010-01-01

    Through history of nuclear power plant operation, a large number of nuclear power plant forced outages related to tube failures occurred. It resulted with large amount of repair and outage costs, what initiated implementation of regulated practice of periodical tube examination and tube condition monitoring. Purpose of examinations is to detect existing or potential tube degradations that could affect tube integrity and therefore result in forced outages and unwanted costs related to emergency repair activities and loss of ability for electrical power production. With increased examination activities, additional information about steam generator tube condition became available and additional methods for ensuring tube integrity became available. As the number of examination solutions increased, need for validation and assessment of examination methods occurred. For that purpose, a large number of standards and guidelines with its requirements were implemented in nuclear industry regulatory requirements to ensure that adequately validated examinations are applied. With this purpose, qualification requirements for inspection activities were implemented with other requirements. With progress of technology, progress was also achieved in examination methods and more advanced examination methods and advanced inspection systems were developed. This advancement is accompanied by advancement in regulatory requirements regarding inspection and monitoring of tube integrity and condition. Ultimate goal of implementation of qualification processes and its requirements in all aspects of nuclear industry is to achieve minimal rate of forced outages, which would ensure maximum electrical power production capabilities and maximum optimization of operational costs while maintaining safe operation in accordance with environmental policies. This article will focus on qualification of steam generator eddy current bobbin probe.(author).

  3. 49 CFR 391.11 - General qualifications of drivers.

    Science.gov (United States)

    2010-10-01

    ... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Qualification and... motor vehicle unless he/she is qualified to drive a commercial motor vehicle. Except as provided in...

  4. 29 CFR 1926.1076 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  5. Prototyping Practice

    DEFF Research Database (Denmark)

    Ramsgaard Thomsen, Mette; Tamke, Martin

    2015-01-01

    This paper examines the role of the prototyping in digital architecture. During the past decade, a new research field has emerged exploring the digital technology’s impact on the way we think, design and build our environment. In this practice the prototype, the pavilion, installation or demonstr......This paper examines the role of the prototyping in digital architecture. During the past decade, a new research field has emerged exploring the digital technology’s impact on the way we think, design and build our environment. In this practice the prototype, the pavilion, installation...

  6. Review of qualifications for fuel assembly fabrication

    International Nuclear Information System (INIS)

    Slabu, Dan; Zemek, Martin; Hellwig, Christian

    2013-01-01

    The required quality of nuclear fuel in industrial production can only be assured by applying processes in fabrication and inspection, which are well mastered and have been proven by an appropriate qualification. The present contribution shows the understanding and experiences of Axpo with respect to qualifications in the frame of nuclear fuel manufacturing and reflects some related expectations of the operator. (orig.)

  7. Qualification tests for PWR control element drive mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new.

  8. Qualification tests for PWR control element drive mechanism

    International Nuclear Information System (INIS)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new

  9. Re-qualification of switchgear equipment following field modification

    International Nuclear Information System (INIS)

    Tulk, J.D.; El Bestawi, M.A.

    1984-01-01

    A set of 4.16 kV switchgear was seismically qualified by shaker table test for use in a nuclear power plant. Later, the equipment was modified by the addition of two extra switches and enclosures. This paper describes the methods used to extend the qualification achieved in the original proof test to the new configuration. Qualification of the modified switchgear depended on demonstrating that the intensity of the shaking that would be experienced by equipment mounted in the extended enclosure during a design basis earthquake (DBE) would be no stronger than the shaking that occurred during the original qualification testing. This was accomplished by a combination of analysis and experiment. Natural frequencies and mode-shapes of the original and extended enclosure structures were determined through in-situ modal tests on the equipment. Mathematical models based on the experimental results were then used for dynamic analyses which generated two sets of in-equipment response spectra: one set representing the original qualification test; and one set representing the response of the modified equipment to a hypothetical DBE. Qualification was confirmed by demonstrating that the test-based response spectra for the original configuration exceeded the response spectra developed for the extended structure subjected to DBE level excitation

  10. Open-Source RTOS Space Qualification: An RTEMS Case Study

    Science.gov (United States)

    Zemerick, Scott

    2017-01-01

    NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

  11. 14 CFR 135.247 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Flight Crewmember Requirements § 135.247 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as pilot in command of an aircraft carrying...

  12. 49 CFR 214.343 - Training and qualification, general.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification, general. 214.343... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.343 Training and qualification, general. (a) No employer shall assign an employee to perform the duties of a...

  13. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  14. An investigation of individual functionality football referees qualifications

    Directory of Open Access Journals (Sweden)

    S.M. Berezka

    2014-12-01

    Full Text Available Purpose: determine the level of individual functionality referees qualifications. Objective of the study was to determine the physiological parameters characterizing the functionality of football referees qualifications. Material : mainly experiment involved 29 highly qualified referees aged 21-45 years. In the main experiment participated 29 referees and 40 assistant referees (n = 69 Ukrainian Premier League. Results: found that the means and methods that use Ukrainian football referee high qualification in the special physical training for a competition, are not effective enough. Consequence of poorly planned training process is to increase the number of wrong decisions of the referees during the match associated with poor motor activity. Conclusions: data obtained in the course of educational research confirmed our theory about the necessity of individualization process special physical training qualifications of referees, which would entail increasing the functional and motor abilities of the referees, and as a consequence of better and successful completion of the work.

  15. Low-level radioactive waste form qualification testing

    International Nuclear Information System (INIS)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing

  16. Low-level radioactive waste form qualification testing

    Energy Technology Data Exchange (ETDEWEB)

    Sohal, M.S.; Akers, D.W.

    1998-06-01

    This report summarizes activities that have already been completed as well as yet to be performed by the Idaho National Engineering and Environmental Laboratory (INEEL) to develop a plan to quantify the behavior of radioactive low-level waste forms. It briefly describes the status of various tasks, including DOE approval of the proposed work, several regulatory and environmental related documents, tests to qualify the waste form, preliminary schedule, and approximate cost. It is anticipated that INEEL and Brookhaven National Laboratory will perform the majority of the tests. For some tests, services of other testing organizations may be used. It should take approximately nine months to provide the final report on the results of tests on a waste form prepared for qualification. It is anticipated that the overall cost of the waste quantifying service is approximately $150,000. The following tests are planned: compression, thermal cycling, irradiation, biodegradation, leaching, immersion, free-standing liquid tests, and full-scale testing.

  17. Prototyping the DARPA Image Understanding Environment (IUE) and Tools to Facilitate Its Use

    National Research Council Canada - National Science Library

    Lawton, Daryl

    1999-01-01

    ...) and Tools to Facilitate Its Use. The major objectives of this project were to support the design and development of the IUE, to prototype the IUE user interface and data exploration tools, and to develop tools for documentation...

  18. Qualification standard for photovoltaic concentrator modules

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.; Kurtz, S.; Bottenberg, W. R.; Hammond, R.; Jochums, S. W.; McDanal, A. J.; Roubideaux, D.; Whitaker, C.; Wohlgemuth, J.

    2000-05-05

    The paper describes a proposed qualification standard for photovoltaic concentrator modules. The standard's purpose is to provide stress tests and procedures to identify any component weakness in photovoltaic concentrator modules intended for power generation applications. If no weaknesses are identified during qualification, both the manufacturer and the customer can expect a more reliable product. The qualification test program for the standard includes thermal cycles, humidity-freeze cycles, water spray, off-axis beam damage, hail impact, hot-spot endurance, as well as electrical tests for performance, ground continuity, isolation, wet insulation resistance, and bypass diodes. Because concentrator module performance can not be verified using solar simulator and reference cell procedures suitable for flat-plate modules, the standard specifies an outdoor I-V test analysis allowing a performance comparison before and after a test procedure. Two options to this complex analysis are the use of a reference concentrator module for side-by-side outdoor comparison with modules undergoing various tests and a dark I-V performance check.

  19. 14 CFR 121.437 - Pilot qualification: Certificates required.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Certificates required... Pilot qualification: Certificates required. (a) No pilot may act as pilot in command of an aircraft (or... pilots) unless he holds an airline transport pilot certificate and an appropriate type rating for that...

  20. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as a required pilot flight crewmember unless within the preceding 90...

  1. Qualification Users' Perceptions and Experiences of Assessment Reliability

    Science.gov (United States)

    Chamberlain, Suzanne

    2013-01-01

    This paper presents the findings of a study designed to explore qualification users' perceptions and experiences of reliability in the context of national assessment outcomes in England. The study consisted of 17 focus groups conducted across six sectors of qualification users: students, teachers, trainee teachers, job-seekers, employers and…

  2. Revision of the qualification framework at the Technical University of Denmark Part 2

    DEFF Research Database (Denmark)

    Henneberg, Kaj-Åge; Kuhn, Luise Theil; Jungersen, Gregers

    2017-01-01

    Using a revised Qualification Framework (QF) with four main categories: -to know, - to be, -to interact, and -to do, this paper demonstrates how to use the elements of the QF to construct Programme-Qualification Matrices. A general Programme- Qualification Matrix defines the qualifications and th...

  3. Questions of qualification exam for non-destructive testing and materials science - the first level

    International Nuclear Information System (INIS)

    Shaaban, H.I.; Addarwish, J.M.A.

    2013-01-01

    The book contains seven chapters: Questions of qualification for magnetic particles testing method - Questions of qualification for liquids penetrant testing method - Questions of qualification for the visual inspection testing method - Questions of qualification for the ultrasonic testing method - Questions of qualification for the eddy current testing method - Questions of rehabilitation for industrial radiographic testing method - Qualification questions about materials science and manufacturing defects of castings and welding and comparison between non-destructive testing methods.

  4. Seismic qualification of existing nuclear installations in India - a proposal

    International Nuclear Information System (INIS)

    Basu, P.C.

    2001-01-01

    In India, the work toward seismic qualification of existing nuclear facilities has been started. Preliminary work is being undertaken with respect to identifying the facilities which would be taken up for seismic qualification, approach and methodology for re-evaluation for seismic safety, acceptance criteria, etc. Work has also been started for framing up the criteria and methodology of the seismic qualification of these facilities. Present paper contains the proposal in this respect. This proposal is on similar lines of the present practice of seismic qualification of NPP, as summarized in the Appendix, but has been modified to suit the special requirements of Indian nuclear installations. (author)

  5. High performing actuation system for use with a louver array for satellite thermal control. [design and performance tests on prototype Bourdon spiral configuration

    Science.gov (United States)

    Reusser, P. U.; Coebergh, J. A. F.

    1973-01-01

    A high performing actuation system has been developed to drive one pair or a set of 9 pairs of louver blades. The system uses a Bourdon spiral as the driving member. The response time of the liquid expansion of the spiral system is in the order of three seconds. Besides performance tests, qualification tests have been carried out on a prototype system, demonstrating that the actuation system withstands normal launching conditions; projected operating life of 7 years with more than 7000 cycles can be expected.

  6. Prototype specification of antenna and radio front-end schemes for PAN devices

    DEFF Research Database (Denmark)

    Wang, Yu; Nguyen, Hung Tuan; johansson, Anders

    2007-01-01

    be implemented in the prototype directly, or used as references in antenna selections for the prototype. Interference mitigation on antenna system level for both HDR and LDR systems is investigated. For the LDR system, interference from the HDR system and UWB systems is identified as most critical. Front......This document provides antenna system specifications for the MAGNET Beyond prototype. Requirements on selecting antenna elements and diversity antenna systems are presented. A number of antenna elements and diversity systems suitable for MAGNET systems are specified. Presented antennas can......-end filtering with high attenuation on 5.2 GHz is suggested to suppress interference from the HDR system. A low-complexity switching diversity antenna system is designed to mitigate UWB interference. The performance of proposed scheme is evaluated with measured channels. The implementation of the scheme...

  7. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Recent experience. 121... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person serve as a required pilot flight crewmember, unless within the preceding 90 days, that person has made...

  8. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting engineer within the provisions of subpart O of this part, for the purpose of operating a steam-driven hoist...

  9. 32 CFR 935.139 - Motor vehicle operator qualifications.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor vehicle operator qualifications. 935.139... AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.139 Motor vehicle operator qualifications. (a) No person may operate a privately owned motor vehicle on Wake Island unless he has an island...

  10. Global Trend In The Qualifications Of Medical Educators | Issa ...

    African Journals Online (AJOL)

    NPMCN) or its equivalents is the highest educational and professional qualification of clinical Medical Educators in Nigeria while PhD is the acceptable highest qualification for their basic medical sciences counterparts. This had been the status ...

  11. Design document for landfill capping Prototype Decision Support System

    International Nuclear Information System (INIS)

    Stone, J.J.; Paige, G.; Hakonson, T.E.; Lane, L.J.

    1994-01-01

    The overall objective of the Prototype Decision Support System for shallow land burial project is to ''Develop a Decision Support System tool which incorporates simulation modeling and multi-objective decision theory for the purpose of designing and evaluating alternative trench cap designs for mixed waste landfill covers. The goal is to improve the quality of technical information used by the risk manager to select landfill cover designs while taking into account technological, economical, and regulatory factors.'' The complexity of the technical and non-technical information, and how the information varies in importance across sites, points to the need for decision analysis tools that provide a common basis for integrating, synthesizing, and valuing the decision input. Because the cost of remediating thousands of contaminated DOE sites is projected to be in the 10's--100's of billions of dollars, methods will be needed to establish cleanup priorities and to help in the selection and evaluation of cost effective remediation alternatives. Even at this early stage in DOE's cleanup program, it is certain that capping technologies will be heavily relied upon to remediate the 3000+ landfills on DOE property. Capping is favored in remediating most DOE landfills because, based on preliminary baseline risk assessments, human and ecological risks are considered to be low at most of these sites and the regulatory requirements for final closure of old landfills can be met using a well designed cap to isolate the buried waste. This report describes a program plan to design, develop, and test a decision support system (DSS) for assisting the DOE risk manager in evaluating capping alternatives for radioactive and hazardous waste landfills. The DOE DSS will incorporate methods for calculating, integrating and valuing technical, regulatory, and economic criteria

  12. Assessing mathematics within advanced school science qualifications

    OpenAIRE

    McAlinden, Mary; Noyes, Andrew

    2017-01-01

    Following sustained discussion regarding the relationship between advanced mathematics and science learning in England, the government has pursued a reform agenda in which mathematics is embedded in national, high stakes A-level science qualifications and their assessments for 18-year-olds. For example, A-level Chemistry must incorporate the assessment of relevant mathematics for at least 20% of the qualification. Other sciences have different mandated percentages. This embedding policy is ru...

  13. Qualification of Daiichi Units 1, 2, and 3 Data for Severe Accident Evaluations - Process and Illustrative Examples from Prior TMI-2 Evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Rempe, Joy Lynn [Idaho National Lab. (INL), Idaho Falls, ID (United States); Knudson, Darrell Lee [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The accidents at the Three Mile Island Unit 2 (TMI-2) Pressurized Water Reactor (PWR) and the Daiichi Units 1, 2, and 3 Boiling Water Reactors (BWRs) provide unique opportunities to evaluate instrumentation exposed to severe accident conditions. Conditions associated with the release of coolant and the hydrogen burn that occurred during the TMI-2 accident exposed instrumentation to harsh conditions, including direct radiation, radioactive contamination, and high humidity with elevated temperatures and pressures. As part of a program initiated in 2012 by the Department of Energy Office of Nuclear Energy (DOE-NE), a review was completed to gain insights from prior TMI-2 sensor survivability and data qualification efforts. This initial review focused on the set of sensors deemed most important by post-TMI-2 instrumentation evaluation programs. Instrumentation evaluation programs focused on data required by TMI-2 operators to assess the condition of the reactor and containment and the effect of mitigating actions taken by these operators. In addition, prior efforts focused on sensors providing data required for subsequent forensic evaluations and accident simulations. To encourage the potential for similar activities to be completed for qualifying data from Daiichi Units 1, 2, and 3, this report provides additional details related to the formal process used to develop a qualified TMI-2 data base and presents data qualification details for three parameters: primary system pressure; containment building temperature; and containment pressure. As described within this report, sensor evaluations and data qualification required implementation of various processes, including comparisons with data from other sensors, analytical calculations, laboratory testing, and comparisons with sensors subjected to similar conditions in large-scale integral tests and with sensors that were similar in design to instruments easily removed from the TMI-2 plant for evaluations. As documented

  14. SRNL PHASE 1 Assessment Of The WTP Waste Qualification Program

    International Nuclear Information System (INIS)

    Peeler, D.; Hansen, E.; Herman, C.; Marra, S.; Wilmarth, B.

    2012-01-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project is currently transitioning its emphasis from an engineering design and construction phase toward facility completion, start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements that must be met during the actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program. In general, the waste qualification program involves testing and analysis to demonstrate compliance with waste acceptance criteria, determine waste processability, and demonstrate laboratory-scale unit operations to support WTP operations. The testing and analysis are driven by data quality objectives (DQO) requirements necessary for meeting waste acceptance criteria for transfer of high-level wastes from the tank farms to the WTP, and for ensuring waste processability including proper glass formulations during processing within the WTP complex. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS) which were based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested subject matter experts (SMEs) from SRNL to support a technology exchange with respect to waste qualification programs in which a critical review of the WTP program could be initiated and lessons learned could be shared. The technology exchange was held on July 18-20, 2011 in Richland, Washington, and was the initial step in a multi-phased approach to support development and implementation of a successful waste qualification program at the WTP. The 3-day workshop was hosted by WTP with representatives from the Tank Operations Contractor (TOC) and SRNL in attendance as well as representatives from the US DOE Office of River Protection (ORP) and the Defense Nuclear Facility Safety Board (DNFSB) Site Representative office. The purpose of the

  15. E-nursing documentation as a tool for quality assurance.

    Science.gov (United States)

    Rajkovic, Vladislav; Sustersic, Olga; Rajkovic, Uros

    2006-01-01

    The article presents the results of a project with which we describe the reengineering of nursing documentation. Documentation in nursing is an efficient tool for ensuring quality health care and consequently quality patient treatment along the whole clinical path. We have taken into account the nursing process and patient treatment based on Henderson theoretical model of nursing that consists of 14 basic living activities. The model of new documentation enables tracing, transparency, selectivity, monitoring and analyses. All these factors lead to improvements of a health system as well as to improved safety of patients and members of nursing teams. Thus the documentation was developed for three health care segments: secondary and tertiary level, dispensaries and community health care. The new quality introduced to the documentation process by information and communication technology is presented by a database model and a software prototype for managing documentation.

  16. 29 CFR 1910.410 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Qualifications of dive team. 1910.410 Section 1910.410... Requirements § 1910.410 Qualifications of dive team. (a) General. (1) Each dive team member shall have the experience or training necessary to perform assigned tasks in a safe and healthful manner. (2) Each dive team...

  17. Enhancing experience prototyping by the help of mixed-fidelity prototypes

    OpenAIRE

    Yasar, Ansar-Ul-Haque

    2007-01-01

    In this research review I undertook the problem related to the usage of a new concept known as the Mixed- Fidelity Prototype which is a mixture of its predecessors Low- and High- Fidelity Prototypes in Experience Prototyping. Experience Prototyping is a good way to explore, communicate and interact with the designs we develop like experiencing cycling on the ice, although the mood, snow conditions, bicycle type and many other factors really matter and tend to change with time. Experience Prot...

  18. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    Energy Technology Data Exchange (ETDEWEB)

    Spaang, Kjell [Ingemansson Technology AB, Goeteborg (Sweden); Staahl, Gunnar [Westinghouse Atom, Vaesteraas (Sweden)

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components.

  19. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components

  20. Comparative Study of Laboratory-Scale and Prototypic Production-Scale Fuel Fabrication Processes and Product Characteristics

    International Nuclear Information System (INIS)

    2014-01-01

    An objective of the High Temperature Gas Reactor fuel development and qualification program for the United States Department of Energy has been to qualify fuel fabricated in prototypic production-scale equipment. The quality and characteristics of the tristructural isotropic coatings on fuel kernels are influenced by the equipment scale and processing parameters. Some characteristics affecting product quality were suppressed while others have become more significant in the larger equipment. Changes to the composition and method of producing resinated graphite matrix material has eliminated the use of hazardous, flammable liquids and enabled it to be procured as a vendor-supplied feed stock. A new method of overcoating TRISO particles with the resinated graphite matrix eliminates the use of hazardous, flammable liquids, produces highly spherical particles with a narrow size distribution, and attains product yields in excess of 99%. Compact fabrication processes have been scaled-up and automated with relatively minor changes to compact quality to manual laboratory-scale processes. The impact on statistical variability of the processes and the products as equipment was scaled are discussed. The prototypic production-scale processes produce test fuels that meet fuel quality specifications.

  1. Economies of using seismic experience data qualification methods at Department of Energy facilities

    International Nuclear Information System (INIS)

    Loceff, F.; Antaki, G.; Goen, L.

    1995-01-01

    This paper summarizes the implementation of the seismic qualification of existing equipment using experience data techniques. The emphasis is on the economies of this approach compared with standard qualification methods of analysis and testing or replacement with qualified equipment. Seismic qualification of existing equipment using experience data is a technical necessity and is the most economically attractive of the options. Representative costs for seismic qualification at two facilities show costs are substantially lower than the costs for qualification using conventional methods. Because of the experience to date, the authors recommend that the Department of Energy continue to sponsor the Existing Facilities Program for applying qualification using experience data techniques at DOE facilities

  2. Qualification of Thermodynamic Data for Geochemical Modeling of Mineral-Water Interactions in Dilute Systems

    International Nuclear Information System (INIS)

    T. J. Wolery; C.F. Jove-Colon

    2004-01-01

    The purpose of this analysis report is to qualify the thermochemical database data0.ymp.R2 (DTN: MO0302SPATHDYN.000 [DIRS 161756], qualified by this report) and supporting calculations (DTNs: MO0302SPATHDYN.001 [DIRS 161886], and MO0303SPASPEQ2.000 [DIRS 162278]), which were originally documented in ''Data Qualification: Update and Revision of the Geochemical Thermodynamic Database, Data0.ymp'' (Steinborn et al. 2003 [DIRS 161956]). This original document still serves as the record of development of the data0.ymp.R2 database (DTN: MO0302SPATHDYN.000 [DIRS 161756]). The data0.ymp.R2 thermodynamic database (DTN: MO0302SPATHDYN.000 [DIRS 161756]) was developed for use with software code EQ3/6 (EQ3/6 V8.0, STN: 10813-8.0-00) (BSC 2003 [DIRS 162228]) and software code EQ6 (EQ6 V7.2bLV, STN: 10075-7.2bLV-02) (BSC 2002 [DIRS 159731]) to conduct geochemical modeling of mineral-fluid interactions involving aqueous solutions (ionic strengths of up to one molal; see Section 6.5) and temperatures of up to 300 C along the liquid-vapor saturation curve of pure water. The data0.ymp.R2 database (DTN: MO0302SPATHDYN.000 [DIRS 161756]) is an update of the previously qualified predecessor database data0.ymp.R0 (DTN: MO0009THRMODYN.001 [DIRS 152576]). The scope of this report is limited to qualification of the updates, as well as identification and evaluation of certain errors and discrepancies as discussed

  3. Qualifications of Subject Teachers in Special Education Schools

    Science.gov (United States)

    Rasmussen, Meryem Uçar; Kis, Arzu

    2018-01-01

    Teacher qualifications are essential to be able to teach children with special needs efficiently. Therefore the aim of this study is to determine the qualifications of subject teachers in special education schools in Turkey. In the study 20 subject teachers within the field of music, art and sports who worked in special education schools in Turkey…

  4. 14 CFR 121.909 - Approval of Advanced Qualification Program.

    Science.gov (United States)

    2010-01-01

    ... criteria. Each AQP must have separate curriculums for indoctrination, qualification, and continuing... the training and evaluation of CRM and technical skills and knowledge. An application for approval of... must meet all the requirements of this subpart. (2) Each indoctrination, qualification, and continuing...

  5. 42 CFR 21.47 - Examination; anticipation of meeting qualifications.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Examination; anticipation of meeting qualifications. 21.47 Section 21.47 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES PERSONNEL COMMISSIONED OFFICERS Appointment § 21.47 Examination; anticipation of meeting qualifications. A...

  6. Contingency Contractor Optimization Phase 3 Sustainment Verification and Validation V&V) Report - Contingency Contractor Optimization Engineering - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Adair, Kristin Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Operations Research and Computational Analysis; Turgeon, Jennifer [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). High Confidence System Environments

    2016-04-01

    The reports and test plans contained within this document serve as supporting materials to the activities listed within the “Contingency Contractor Optimization Tool – Prototype (CCOT-P) Verification & Validation Plan” [1]. The activities included test development, testing, peer reviews, and expert reviews. The engineering prototype reviews were done for both the software and the mathematical model used in CCOT-P. Section 2 includes the peer and expert review reports, which summarize the findings from each of the reviews and document the resolution of any issues. Section 3 details the test plans that were followed for functional testing of the application through the interface. Section 4 describes the unit tests that were run on the code.

  7. Hanford prototype-barrier status report FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    Gee, G.W.; Ward, A.L.; Gilmore, B.G.; Link, S.O.; Dennis, G.W.; O`Neil, T.K.

    1996-11-01

    A prototype surface barrier is being evaluated as part of a treatability study at the 200-BP-1 Operable Unit in the 200 East Area of the Hanford Site. Tests include the application of irrigation water to the northern half of the barrier and subsequent measurement of water balance, wind and water erosion, subsidence, plant establishment,a nd plant and animal intrusion. The tests are designed to evaluate both irrigated and nonirrigated sideslope and vegetated surfaces over a period of 3 years. This report documents findings from the second year of testing.

  8. Hanford prototype-barrier status report FY 1996

    International Nuclear Information System (INIS)

    Gee, G.W.; Ward, A.L.; Gilmore, B.G.; Link, S.O.; Dennis, G.W.; O'Neil, T.K.

    1996-11-01

    A prototype surface barrier is being evaluated as part of a treatability study at the 200-BP-1 Operable Unit in the 200 East Area of the Hanford Site. Tests include the application of irrigation water to the northern half of the barrier and subsequent measurement of water balance, wind and water erosion, subsidence, plant establishment,a nd plant and animal intrusion. The tests are designed to evaluate both irrigated and nonirrigated sideslope and vegetated surfaces over a period of 3 years. This report documents findings from the second year of testing

  9. Seismic qualification tests of fans of the NPP of Laguna Verde U-1 and U-2; Pruebas de calificacion sismica de ventiladores de la Central Laguna Verde U1 and U2

    Energy Technology Data Exchange (ETDEWEB)

    Jarvio C, G.; Garcia H, E. E.; Arguelles F, R.; Vela H, A. [ININ, Carretera Mexico-Toluca s/n, 52750 Ocoyoacac, Estado de Mexico (Mexico); Naranjo U, J. L., E-mail: gilberto.jarvio@inin.gob.mx [Comision Federal de Electricidad, Gerencia de Centrales Nucleoelectricas, Subgerencia de Ingenieria, Carretera Veracruz-Medellin Km 7.5, Dos Bocas, Veracruz (Mexico)

    2013-10-15

    This work presents the results of the seismic qualification tests applied to the fans that will be installed in the control panels of the three divisions of the diesel generators of the nuclear power plant (NPP) of Laguna Verde, Unit-1 and Unit-2. This seismic qualification process of the fans was carried out using two specimens that were tested in the seismic table (vibrating) of the Engineering Institute of Universidad Nacional Autonoma de Mexico (UNAM), in accordance with the requirements of the standard IEEE 344-1975, to satisfy the established requirements of seismic qualification in the technical specifications and normative documents required by the nuclear standards, in order to demonstrate its application in the diesel generators Divisions I, II and III of the NPP. The seismic qualification tests were developed on specimens that were retired of the NPP of Laguna Verde recently with a service life of 7.75 years. (Author)

  10. Qualification, commissioning and in situ monitoring of high heat flux plasma facing components

    Energy Technology Data Exchange (ETDEWEB)

    Escourbiac, F. [Association Euratom-CEA, CEA/DSM/DRFC, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France)], E-mail: frederic.escourbiac@cea.fr; Durocher, A.; Grosman, A.; Cismondi, F.; Courtois, X.; Farjon, J.L.; Schlosser, J. [Association Euratom-CEA, CEA/DSM/DRFC, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France); Merola, M.; Tivey, R. [ITER Team, CEA/Cadarache, F-13108 Saint Paul Lez Durance (France)

    2007-10-15

    Up-to-date development of actively cooled high heat flux (HHF) plasma facing components (PFC) prototypes only allows reduced margins with regards to the ITER thermal requirements. Additionally, perfect quality cannot be ensured along series manufacturing: the presence of flaws which impair the heat transfer capability of the component, in particular at the interface armour/heat sink appears to be statistically unavoidable. In order to ensure a successful series production, a qualification methodology of actively cooled high heat flux plasma facing components is proposed. Secondly, advanced non-destructive techniques developed for HHF PFC commissioning are detailed with definition of acceptance criteria. Finally, innovative diagnostics for in situ monitoring during plasma operations or tokamak shutdowns are investigated in order to prevent immediate damage (safety monitoring); or evaluate component degradation (health monitoring). This work takes into account the relevance to Tore Supra, and is applied to W7X and ITER Divertor HHF PFC.

  11. Qualification, commissioning and in situ monitoring of high heat flux plasma facing components

    International Nuclear Information System (INIS)

    Escourbiac, F.; Durocher, A.; Grosman, A.; Cismondi, F.; Courtois, X.; Farjon, J.L.; Schlosser, J.; Merola, M.; Tivey, R.

    2007-01-01

    Up-to-date development of actively cooled high heat flux (HHF) plasma facing components (PFC) prototypes only allows reduced margins with regards to the ITER thermal requirements. Additionally, perfect quality cannot be ensured along series manufacturing: the presence of flaws which impair the heat transfer capability of the component, in particular at the interface armour/heat sink appears to be statistically unavoidable. In order to ensure a successful series production, a qualification methodology of actively cooled high heat flux plasma facing components is proposed. Secondly, advanced non-destructive techniques developed for HHF PFC commissioning are detailed with definition of acceptance criteria. Finally, innovative diagnostics for in situ monitoring during plasma operations or tokamak shutdowns are investigated in order to prevent immediate damage (safety monitoring); or evaluate component degradation (health monitoring). This work takes into account the relevance to Tore Supra, and is applied to W7X and ITER Divertor HHF PFC

  12. 5 CFR 531.212 - Superior qualifications and special needs pay-setting authority.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Superior qualifications and special needs... Appointment Or Position Changes § 531.212 Superior qualifications and special needs pay-setting authority. (a) Agency authority. (1) An agency may use the superior qualifications and special needs pay-setting...

  13. Qualification of box HEPA filters for nuclear applications

    International Nuclear Information System (INIS)

    Bergman, W.; Larsen, G.; Wilson, K.; Rainer, F.

    1995-03-01

    We have successfully completed qualification tests on high efficiency particulate air (HEPA) filters that are encapsulated within a box and manufactured by American Air Filters. The qualification tests are required by the American Society of Mechanical Engineers Standard ASME N509 and the U.S. Military Standard MIL-F-51068 for HEPA filters to be used in nuclear applications. The qualification tests specify minimum filter efficiencies following exposure to heated air, overpressure, and rough handling. Prior to this study, no box HEPA filters from any manufacturer had been qualified despite their wide-spread use in Department of Energy (DOE) facilities. Box HEPA filters are not addressed in any of the existing HEPA standards and only briefly discussed in the Nuclear Air Cleaning Handbook

  14. Qualification issues for advanced light-water reactor protection systems

    International Nuclear Information System (INIS)

    Korsah, K.; Clark, R.L.; Antonescu, C.

    1993-01-01

    The instrumentation and control (I ampersand C) systems in advanced reactors will make extensive use of digital controls, microprocessors, multiplexing, and fiber optic transmission. Elements of these advances in I ampersand C have been implemented on some current operating plants. However, the widespread use of the above technologies, as well as the use of artificial intelligence with minimum reliance on human operator control of reactors, highlights the need to develop standards for qualifying the I ampersand C used in the next generation of nuclear power plants. As a first step in this direction, the protection system I ampersand C for present-day plants was compared to that proposed for advanced light-water reactors (ALWRs). An evaluation template was developed by assembling a configuration of a safety channel instrument string for a generic ALWR, then comparing the impact of environmental stressors on that string to their effect on an equivalent instrument string from an existing light-water reactor. The template was then used to suggest a methodology for the qualification of microprocessor-based protection systems. The methodology identifies standards/regulatory guides (or lack thereof) for the qualification of microprocessor-based safety I ampersand C systems. This approach addresses in part issues raised in NRC policy document SECY-91-292, which recognizes that advanced I ampersand C systems for the nuclear industry are ''being developed without consensus standards. as the technology available for design is ahead of the technology that is well understood through experience and supported by application standards.''

  15. Experience on environmental qualification of safety-related components for Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Yu, A.S.; Kukreti, B.M.

    1987-01-01

    The proliferation of Nuclear Power Plant safety concerns has lead to increasing attention over the Environmental Qualification (EQ) of Nuclear Power Plant Safety-Related Components to provide the assurance that the safety related equipment will meet their intended functions during normal operation and postulated accident conditions. The environmental qualification of these components is also a Licensing requirement for Darlington Nuclear Generating Station. This paper provides an overview of EQ and the experience of a pilot project, in the qualification of the Main Moderator System safety-related functions for the Darlington Nuclear Generating Station currently under construction. It addresses the various phases of qualification from the identification of the EQ Safety-Related Components List, definition of location specific service conditions (normal, adbnormal and accident), safety-related functions, Environmental Qualification Assessments and finally, an EQ system summary report for the Main Moderator System. The results of the pilot project are discussed and the methodology reviewed. The paper concludes that the EQ Program developed for Darlington Nuclear Generating Station, as applied to the qualification of the Main Moderator System, contained all the elements necessary in the qualification of safety-related equipment. The approach taken in the qualification of the Moderator safety-related equipment proves to provide a sound framework for the qualification of other safety-related components in the station

  16. Qualifications Frameworks and Their Conflicting Social Imaginaries of Globalisation

    Science.gov (United States)

    Louise Sarauw, Laura

    2012-01-01

    Critics often see the European Bologna Process as a univocal standardisation of higher education. By exploring how different qualifications frameworks project different social imaginaries of globalisation, this article takes a different stance. The overarching qualifications framework of the Bologna Process rests on a socially constituted and…

  17. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  18. Investigating the role of implicit prototypes in the prototype willingness model.

    Science.gov (United States)

    Howell, Jennifer L; Ratliff, Kate A

    2017-06-01

    One useful theory to predict health behavior is the prototype-willingness model (PWM), which posits that people are more willing to engage in behavior to the extent that they have a positive view of the prototypical person who performs that behavior. The goal of the present research is to test whether adding an implicit measure of prototype favorability might improve explanatory power in the PWM. Two studies examined whether implicit prototype favorability uniquely predicted White women's intentions to engage in healthy sun behavior over the next 3-6 months, and their willingness to engage in risky sun behavior, should the opportunity arise. The results suggested that implicit prototype favorability, particularly implicit prototypes of those who engage in risky UV-related behaviors, uniquely predicted intentions to engage in healthy sun behavior and willingness to engage in risky sun behavior in the PWM.

  19. Software Prototyping

    Science.gov (United States)

    Del Fiol, Guilherme; Hanseler, Haley; Crouch, Barbara Insley; Cummins, Mollie R.

    2016-01-01

    Summary Background Health information exchange (HIE) between Poison Control Centers (PCCs) and Emergency Departments (EDs) could improve care of poisoned patients. However, PCC information systems are not designed to facilitate HIE with EDs; therefore, we are developing specialized software to support HIE within the normal workflow of the PCC using user-centered design and rapid prototyping. Objective To describe the design of an HIE dashboard and the refinement of user requirements through rapid prototyping. Methods Using previously elicited user requirements, we designed low-fidelity sketches of designs on paper with iterative refinement. Next, we designed an interactive high-fidelity prototype and conducted scenario-based usability tests with end users. Users were asked to think aloud while accomplishing tasks related to a case vignette. After testing, the users provided feedback and evaluated the prototype using the System Usability Scale (SUS). Results Survey results from three users provided useful feedback that was then incorporated into the design. After achieving a stable design, we used the prototype itself as the specification for development of the actual software. Benefits of prototyping included having 1) subject-matter experts heavily involved with the design; 2) flexibility to make rapid changes, 3) the ability to minimize software development efforts early in the design stage; 4) rapid finalization of requirements; 5) early visualization of designs; 6) and a powerful vehicle for communication of the design to the programmers. Challenges included 1) time and effort to develop the prototypes and case scenarios; 2) no simulation of system performance; 3) not having all proposed functionality available in the final product; and 4) missing needed data elements in the PCC information system. PMID:27081404

  20. Qualification of electrical equipment. A United States nuclear system supplier perspective

    International Nuclear Information System (INIS)

    Jordan, W.G.

    1978-01-01

    At Westinghouse Pressurized Water Reactor Systems Division (PWR-SD) qualification. of safety related electrical equipment can be segregated into three distinct generations: (1) the initial seismic and environmental qualification programs for electrical equipment (1969-1972); (2) the supplemental sismic and environmental qualification programs (1975-1977); and (3) the seismic and environmental qualification programs to meet IEEE-323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations''(1975). The latter two programs (in a licensing framework), as they are most current, with emphasis on electrical equipment (e.g. transmitters, rack mounted equipment) as opposed to electro-mechanical equipment (valve operators, pump motors) are reviewed. (author)

  1. The process control and management on equipment qualification of nuclear power plant

    International Nuclear Information System (INIS)

    Liu Dong; Wang Hongyin; Zhang Yong

    2013-01-01

    The equipment qualification (EQ) to the safety class equipment is an important safety measure for the nuclear power plants (NPP), and also reflects the nuclear safety culture. Along with the continuous constructions of NPP in China, it has become an important issue for NPP engineering company and equipment suppliers how to effectively establish standard EQ process control and management, and provide sufficient technical arrangements to maintain this EQ management system. This paper summarizes three process of EQ including Design Input, EQ Establishment and EQ Maintenance, proposes the measures and key points for EQ process control and management in phase of NPP construction, and introduces the documents management during the whole process of EQ. (authors)

  2. Biointrusion test plan for the Permanent Isolation Surface Barrier Prototype

    International Nuclear Information System (INIS)

    Link, S.O.; Cadwell, L.L.; Brandt, C.A.; Downs, J.L.; Rossi, R.E.; Gee, G.W.

    1994-04-01

    This document provides a testing and monitoring plan for the biological component of the prototype barrier slated for construction at the Hanford Site. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system. It is designed to permanently isolate waste from the biosphere. The features of the barrier include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, covered with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype barrier over the next several years to evaluate barrier performance under extreme climatic conditions. Plants and animals will play a significant role in the hydrologic and water and wind erosion characteristics of the prototype barrier. Studies on the biological component of the prototype barrier will include work on the initial revegetation of the surface, continued monitoring of the developing plant community, rooting depth and dispersion in the context of biointrusion potential, the role of plants in the hydrology of the surface and toe regions of the barrier, the role of plants in stabilizing the surface against water and wind erosion, and the role of burrowing animals in the hydrology and water and wind erosion of the barrier

  3. Seamless Management of Paper and Electronic Documents for Task Knowledge Sharing

    Science.gov (United States)

    Kojima, Hiroyuki; Iwata, Ken

    Due to the progress of Internet technology and the increase of distributed information on networks, the present knowledge management has been based more and more on the performance of various experienced users. In addition to the increase of electronic documents, the use of paper documents has not been reduced because of their convenience. This paper describes a method of tracking paper document locations and contents using radio frequency identification (RFID) technology. This research also focuses on the expression of a task process and the seamless structuring of related electronic and paper documents as a result of task knowledge formalization using information organizing. A system is proposed here that implements information organization for both Web documents and paper documents with the task model description and RFID technology. Examples of a prototype system are also presented.

  4. NRC Information No. 89-23: Environmental qualification of Litton-Veam CIR series electrical connectors

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    Litton-Veam CIR series multi-pin electrical connectors are used in core exit thermocouple (CET) and reactor vessel level monitoring (RVLM) systems supplied to numerous plants by Combustion Engineering, Inc., and are used in other applications in at least three additional plants. A proprietary qualification test report has been used to document environmental qualification of the connectors for loss of coolant accident (LOCA) conditions in the CE-supplied systems. During LOCA testing, the connector face seal gasket was completely degraded and elastomeric inserts interacted with simulated containment spray solution which leaked into the connector. Insulation resistances near 1,000 ohms were measured. CE has performed analyses to show that resultant errors are acceptable in CE-supplied CET and RVLM system thermocouple circuits. However, the moisture ingress and resultant low insulation resistances are not acceptable for heater circuits in the RVLM. For that application, CE developed two remedies; one is a clamp, and the other is a new connector design. CE has advised that one of these remedies has been used for all of the RVLM heater circuits. Unmodified CIR connectors are believed to be still in use in other applications

  5. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  6. Technical Support Document: Strategies for 50% Energy Savings in Large Office Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Leach, M.; Lobato, C.; Hirsch, A.; Pless, S.; Torcellini, P.

    2010-09-01

    This Technical Support Document (TSD) documents technical analysis that informs design guidance for designing and constructing large office buildings that achieve 50% net site energy savings over baseline buildings defined by minimal compliance with respect to ANSI/ASHRAE/IESNA Standard 90.1-2004. This report also represents a step toward developing a methodology for using energy modeling in the design process to achieve aggressive energy savings targets. This report documents the modeling and analysis methods used to identify design recommendations for six climate zones that capture the range of U.S. climate variability; demonstrates how energy savings change between ASHRAE Standard 90.1-2007 and Standard 90.1-2004 to determine baseline energy use; uses a four-story 'low-rise' prototype to analyze the effect of building aspect ratio on energy use intensity; explores comparisons between baseline and low-energy building energy use for alternate energy metrics (net source energy, energy emissions, and energy cost); and examines the extent to which glass curtain construction limits achieve energy savings by using a 12-story 'high-rise' prototype.

  7. ENIQ: European Network for Inspection Qualification: Status report

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Crutzen, S.; Lemaitre, P.

    1998-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In this paper the main activities, organisation and actual status of ENIQ are discussed. (author)

  8. European methodology for qualification of NDT as developed by ENIQ

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Engl, G.; Crutzen, S.; Lemaitre, P.

    1997-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In the framework of ENIQ the European methodology for qualification of NDT has been developed. In this paper the main principles of the European methodology are given besides the main activities and organisation of ENIQ. (orig.)

  9. Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bannochie, C. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

  10. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  11. 12 CFR 231.3 - Qualification as a financial institution.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Qualification as a financial institution. 231.3... RESERVE SYSTEM NETTING ELIGIBILITY FOR FINANCIAL INSTITUTION (REGULATION EE) § 231.3 Qualification as a financial institution. (a) A person qualifies as a financial institution for purposes of sections 401-407 of...

  12. Lower-Level Qualifications as a Stepping Stone for Young People. Occasional Paper

    Science.gov (United States)

    Oliver, Damian

    2012-01-01

    Lower-level qualifications (certificate I and II programs) provide little or no immediate return to the individual in terms of increased wages. However, lower-level qualifications are intended to prepare students who would otherwise not be capable of enrolling in and completing a higher-level qualification or making a successful transition into…

  13. Nuclear criticality safety specialist training and qualification programs

    International Nuclear Information System (INIS)

    Hopper, C.M.

    1993-01-01

    Since the beginning of the Nuclear Criticality Safety Division of the American Nuclear Society (ANS) in 1967, the nuclear criticality safety (NCS) community has sought to provide an exchange of information at a national level to facilitate the education and development of NCS specialists. In addition, individual criticality safety organizations within government contractor and licensed commercial nonreactor facilities have developed training and qualification programs for their NCS specialists. However, there has been substantial variability in the content and quality of these program requirements and personnel qualifications, at least as measured within the government contractor community. The purpose of this paper is to provide a brief, general history of staff training and to describe the current direction and focus of US DOE guidance for the content of training and qualification programs designed to develop NCS specialists

  14. Solution Prototype

    DEFF Research Database (Denmark)

    Efeoglu, Arkin; Møller, Charles; Serie, Michel

    2013-01-01

    This paper outlines an artifact building and evaluation proposal. Design Science Research (DSR) studies usually consider encapsulated artifact that have relationships with other artifacts. The solution prototype as a composed artifact demands for a more comprehensive consideration in its systematic...... environment. The solution prototype that is composed from blending product and service prototype has particular impacts on the dualism of DSR’s “Build” and “Evaluate”. Since the mix between product and service prototyping can be varied, there is a demand for a more agile and iterative framework. Van de Ven......’s research framework seems to fit this purpose. Van de Ven allows for an iterative research approach to problem solving with flexible starting point. The research activity is the result between the iteration of two dimensions. This framework focuses on the natural evaluation, particularly on ex...

  15. Instructor qualification for radiation safety training at a national laboratory

    International Nuclear Information System (INIS)

    Trinoskey, P.A.

    1994-10-01

    Prior to 1993, Health Physics Training (HPT) was conducted by the Lawrence Livermore National Laboratory (LLNL) health physics group. The job requirements specified a Masters Degree and experience. In fact, the majority of Health Physicists in the group were certified by the American Board of Health Physics. Under those circumstances, it was assumed that individuals in the group were technically qualified and the HPT instructor qualification stated that. In late 1993, the Health Physics Group at the LLNL was restructured and the training function was assigned to the training group. Additional requirements for training were mandated by the Department of Energy (DOE), which would necessitate increasing the existing training staff. With the need to hire, and the policy of reassignment of employees during downsizing, it was imperative that formal qualification standards be developed for technical knowledge. Qualification standards were in place for instructional capability. In drafting the new training qualifications for instructors, the requirements of a Certified Health Physicists had to be modified due to supply and demand. Additionally, for many of the performance-based training courses, registration by the National Registry of Radiation Protection Technologists is more desirable. Flexibility in qualification requirements has been incorporated to meet the reality of ongoing training and the compensation for desirable skills of individuals who may not meet all the criteria. The qualification requirements for an instructor rely on entry-level requirements and emphasis on goals (preferred) and continuing development of technical and instructional capabilities

  16. Sport Management Interns--Selection Qualifications.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1993-01-01

    Examines and rates the background qualifications and qualities, identified by sport management practitioners through an examination of paper credentials, that are desired in interviewees vying for selection into sport management internship positions. (GLR)

  17. Qualification Paths of Adult Educators in Sweden and Denmark

    Science.gov (United States)

    Andersson, Per; Kopsen, Susanne; Larson, Anne; Milana, Marcella

    2013-01-01

    The qualification of adult educators is a central aspect of the quality of adult education. However, within current policy discourses and adult education research on the professional development of prospective adult educators, little attention is paid to teacher qualification when compared to other fields of education and training. In this study,…

  18. Report on functional requirements and software architecture for the IDTO prototype : phase I demonstration site (Columbus).

    Science.gov (United States)

    2013-08-01

    This report documents the System Requirements and Architecture for the Phase I implementation of the Integrated Dynamic : Transit Operations (IDTO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle : Pro...

  19. Report on functional requirements and software architecture for the IDTO prototype phase 2 : central Florida demonstration.

    Science.gov (United States)

    2015-05-01

    This report documents the System Requirements and Architecture for the Phase 2 implementation of the Integrated Dynamic : Transit Operations (IDTO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected Vehicle : Pro...

  20. Selection, qualification and training of personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This standard provides criteria for the selection, qualification and training of personnel for stationary nuclear power plants. Qualifications, responsibilities, and training of personnel in operating and support organizations appropriate for the safe and efficient operation of nuclear power plants are addressed

  1. Passive autocatalytic recombiner process features and new status of international qualification

    International Nuclear Information System (INIS)

    Eckardt, Bernd A.; Losch, Norbert

    2010-01-01

    New results of International PAR-Severe Accidents Qualification in frame of EC/IRSN Core Melt Program PHEBUS (with real molten core) are presented. Example Results: AREVA PAR Design: Best performance very fast start-up • highest efficiency absolutely constant hydrogen depletion rates. Others: Some industrial competitors failed. This enveloping real severe accident tests represents the new international PAR qualification standard and finalized the PAR qualification successfully. The design features supports PAR Dual function

  2. Qualification of uranium-molybdenum alloy fuel - conclusions of an international workshop

    International Nuclear Information System (INIS)

    Snelgrove, J.L.; Languille, A.

    2000-01-01

    Thirty-one participants representing 21 reactors, fuel developers, fuel fabricators, and fuel reprocessors in 11 countries discussed the requirements for qualification of U-Mo alloy fuel at a workshop held at Argonne National Laboratory on January 17-18, 2000. Consensus was reached that the qualification plans of the U.S. RERTR program and the French U-Mo fuel development program are valid. The items to be addressed during qualification are summarized in the paper. (author)

  3. Understanding to requirements for educational level in qualification of reactor operators

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhou Limin

    2007-01-01

    Requirements for qualification of reactor operators in nuclear safety regulations were discussed in this paper. The new issue was described in the confirmation of education level of reactor operators. The understanding to the requirements for Educational Level in Qualification of Reactor Operators was provided according to Higher Education Law of the People's Republic of China. It was proposed to improve the confirmation of qualification of reactor operators as soon as possible. (authors)

  4. Helicopter-Ship Qualification Testing

    NARCIS (Netherlands)

    Hoencamp, A.

    2015-01-01

    The goal of this research project is to develop a novel test methodology which can be used for optimizing cost and time efficiency of helicopter-ship qualification testing without reducing safety. For this purpose, the so-called “SHOL-X” test methodology has been established, which includes the

  5. Experiment and analysis of hypervapotron mock-ups for preparing the 2nd qualification of the ITER blanket first wall

    International Nuclear Information System (INIS)

    Lee, Dong Won; Bae, Young Dug; Kim, Suk Kwon; Bang, In Cheol

    2010-01-01

    According to the increased heat flux condition up to 5 MW/m 2 in the International Thermonuclear Experimental Reactor (ITER), new design of the blanket first wall (FW) has been considered and the analysis was performed with ANSYS-CFX for checking its temperature with the ITER operation conditions. And a semi-prototype of the FW was proposed to be tested with the similar heat flux conditions under the second qualification for the FW procurement. In order to investigate the fabrication procedure and analysis capability of the code, two types of mock-up were fabricated according to the current semi-prototype design except for bending shape; one with hypervapotron and another without it. They were tested with KoHLT-2 (Korea Heat Load Test) facility and the results were compared with the ones by CFX code. The mass flow rate of inlet coolant was the same as the ITER condition and heat flux was loaded up to 0.48 MW/m 2 heat flux. The results show that the temperature of the mock-up can be predicted using the CFX code even with the complex geometry and the hypervapotron shows its function to increase the cooling.

  6. 12 CFR 563c.3 - Qualification of public accountant.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Qualification of public accountant. 563c.3... REQUIREMENTS Form and Content of Financial Statements § 563c.3 Qualification of public accountant. (See also 17 CFR 210.2-01.) The term “qualified public accountant” means a certified public accountant or licensed...

  7. Unresolved Safety Issue A-46 - seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Anderson, N.

    1985-01-01

    Seismic Qualification of Equipment in Operating Plants was designated as an Unresolved Safety Issue (USI) in December, 1980. The USI A-46 program was developed in early 1981 to investigate the adequacy of mechanical and electrical equipment in operating plants to withstand a safe shutdown earthquake. The approach taken was to develop viable, cost effective alternatives to current seismic qualification licensing requirements which could be applied to operating nuclear power plants. The tasks investigated include: (1) identification of seismic sensitive systems and equipment; (2) assessment of adequacy of existing seismic qualification methods; (3) development and assessment of in-situ test procedures to assist in qualification of equipment; (4) seismic qualification of equipment using seismic experience data; and (5) development of methods to generate generic floor response spectra. Progress to date and plans for completion of resolution are reported

  8. 78 FR 53025 - Pilot Certification and Qualification Requirements for Air Carrier Operations; Correction

    Science.gov (United States)

    2013-08-28

    ...-0100; Amdt. No. 141-17A] RIN 2120-AJ67 Pilot Certification and Qualification Requirements for Air... regulations to create new certification and qualification requirements for pilots in air carrier operations..., the FAA published a final rule entitled, ``Pilot Certification and Qualification Requirements for Air...

  9. Cooperative Prototyping Experiments

    DEFF Research Database (Denmark)

    Bødker, Susanne; Grønbæk, Kaj

    1989-01-01

    This paper describes experiments with a design technique that we denote cooperative prototyping. The experiments consider design of a patient case record system for municipal dental clinics in which we used HyperCard, an off the shelf programming environment for the Macintosh. In the ecperiments we...... tried to achieve a fluent work-like evaluation of prototypes where users envisioned future work with a computer tool, at the same time as we made on-line modifications of prototypes in cooperation with the users when breakdown occur in their work-like evaluation. The experiments showed...... that it was possible to make a number of direct manipulation changes of prototypes in cooperation with the users, in interplay with their fluent work-like evaluation of these. However, breakdown occurred in the prototyping process when we reached the limits of the direct manipulation support for modification. From...

  10. Qualification issues: the rest of the iceberg

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Luna, R.E.

    1978-01-01

    Reactor safety has been a primary concern since the beginning of commercial power reactor development. But only since the IEEE became actively involved (circa-1970), through IEEE-323-1971 and its predecessor drafts, has the qualification of selected Class 1 equipment been formalized and intensified. Currently EPRI and the USNRC are funding significant qualification research programs. However, these current research topics address only a few of the issues and there are more to come. A review of recent achievements and a discussion of some issues still to be encountered are presented

  11. Minimum qualifications for nuclear criticality safety professionals

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1990-01-01

    A Nuclear Criticality Technology and Safety Training Committee has been established within the U.S. Department of Energy (DOE) Nuclear Criticality Safety and Technology Project to review and, if necessary, develop standards for the training of personnel involved in nuclear criticality safety (NCS). The committee is exploring the need for developing a standard or other mechanism for establishing minimum qualifications for NCS professionals. The development of standards and regulatory guides for nuclear power plant personnel may serve as a guide in developing the minimum qualifications for NCS professionals

  12. Rancang Bangun Document Management System Untuk Mengelola Dokumen Standart Operational Procedure

    Directory of Open Access Journals (Sweden)

    I Putu Susila Handika

    2017-09-01

    Standard Operational Procedure (SOP is one important document in a company because it is useful to improve the quality of the company. PT. Global Retailindo Pratama is one of the companies engaged in retail that using standard of quality management ISO 9001: 2008. Currently the management of SOP documents at PT. Global Retailindo Pratama still use manual way. Manual way cause some problems such as the search process and document distribution process takes quite a long time. This research aims to design and build Document Management System to manage SOP documents. The system development model used in this research is prototyping model. This application is built in web-based with PHP as programming language. Testing the application using Blak Box Testing and Usability Testing shows that the Document Management System can run in accordance with the needs and can be used easily so that the process of document management SOP becomes faster. Keywords: Document Management System, Standart Operational Procedure, Information System, PHP.

  13. Unikabeton Prototype

    DEFF Research Database (Denmark)

    Søndergaard, Asbjørn; Dombernowsky, Per

    2011-01-01

    The Unikabeton prototype structure was developed as the finalization of the cross-disciplinary research project Unikabeton, exploring the architectural potential in linking the computational process of topology optimisation with robot fabrication of concrete casting moulds. The project was elabor......The Unikabeton prototype structure was developed as the finalization of the cross-disciplinary research project Unikabeton, exploring the architectural potential in linking the computational process of topology optimisation with robot fabrication of concrete casting moulds. The project...... of Architecture was to develop a series of optimisation experiments, concluding in the design and optimisation of a full scale prototype concrete structure....

  14. Distinct ERP Signatures of Word Frequency, Phrase Frequency, and Prototypicality in Speech Production

    Science.gov (United States)

    Hendrix, Peter; Bolger, Patrick; Baayen, Harald

    2017-01-01

    Recent studies have documented frequency effects for word n-grams, independently of word unigram frequency. Further studies have revealed constructional prototype effects, both at the word level as well as for phrases. The present speech production study investigates the time course of these effects for the production of prepositional phrases in…

  15. Experimental conditions and monitoring items of the prototype repository project (PRP). Research document

    International Nuclear Information System (INIS)

    Sugita, Yutaka; Ito, Akira; Kawakami, Susumu

    2003-03-01

    Various experiments are ongoing in the underground research facility 'the Hard Rock Laboratory (HRL)' of SKB in Sweden for the geological disposal of the high-level radioactive waste. International joint project Prototype Repository Project (PRP) is one of the experiments in the HRL which has some engineered barrier systems and to study the coupled behavior happening in and around the engineered barrier system. JNC has joined this international joint project PRP to obtain the information of the coupled behavior on such systematic engineered barrier system and to apply the JNC's coupled THMC analytical code to the prediction and back analysis of the PRP. The analytical code will be verified through these analyses in this project. JNC can apply the verified analytical code to assess the coupled behavior in Japan. This report summarizes the experimental conditions and monitoring items of the PRP. (author)

  16. Generic test procedure for the qualification of a nuclear emergency generator

    International Nuclear Information System (INIS)

    Simonis, J.C.; Bowman, S.W.

    1985-01-01

    This paper describes the proposed analytical and experimental procedures for the qualification of the standby generators and exciters used in the Emergency Diesel Generator Systems in a nuclear power plant. The components which require qualification are identified through a failure mode analysis of the systems conducted using engineering drawings updated to include all field changes. The qualification of each component includes the margins given in IEEE Std. 323-1974, ''Qualifying Class 1E Equipment for Nuclear Power Generating Stations.'' These margins are combined with the plant specific data to define an enveloping set of environmental parameters. This set of enveloping parameters, plus margin, form the bases for the analysis or test qualification tasks. Proposed qualification of the composite electrical insulation systems used in the generator and exciter on the form or random wound coils is by traceable testing. However, before testing the thermal and radiation degradation data used in the design of the generator and exciter are evaluated to identify if these data are sufficiently traceable to eliminate the need for additional insulation tests. The required tests are guided by applicable standards

  17. Attribute measurement systems prototypes and equipment in the United States

    International Nuclear Information System (INIS)

    Langner, D.C.; Landry, R.P.; Hsue, S.-T.; MacArthur, D.W.; Mayo, D.R.; Smith, M.K.; Nicholas, N.J.; Whiteson, R.

    2001-01-01

    Since the fall of 1997, the United States has been developing prototypical attribute verification technology for potential use by the International Atomic Energy Agency (IAEA) under the Trilateral Initiative. The first attribute measurement equipment demonstration took place in December 1997 at the Lawrence Livermore National Laboratory. This demonstration led to a series of joint Russian Federatioin/US/IAEA technical discussions that focused on attribute measurement technology that could be applied to plutonium bearing items having classified characteristics. A first prototype attribute verification system with an information barrier was demonstrated at a Trilateral Technical Workshop in June 1999 at Los Alamos. This prototype nourished further fruitful discussions between the three parties that has in turn led to the documents discussed in a previous paper. Prototype development has continued in the US, under other initiatives, using an integrated approach that includes the Trilatleral Initiative. Specifically for the Trilateral Initiative, US development has turned to some peripheral equipment that would support verifications by the IAEA. This equipment includes an authentication tool for measurement systems with information barriers and in situ probes that would facilitate inspections by reducing the need to move material out of storage locations for reverification. In this paper, we will first summarize the development of attribute verification measurement system technology in the US and then report on the status of the development of other equipment to support the Trilateral Initiative.

  18. AGR-3/4 Final Data Qualification Report for ATR Cycles 151A through 155B-1

    Energy Technology Data Exchange (ETDEWEB)

    Pham, Binh T. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-03-01

    Analysis System (NDMAS). The AGR 3/4 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates, pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates, release to birth rate ratios [R/Bs], and particle failure counts) for each of the twelve capsules in the AGR 3/4 experiment. During Outage Cycle 155A, fourteen flow meters were installed downstream from fourteen FPMS monitors to measure flows from the monitors; qualification status of these data are also included in the report. The final data qualification status for these data streams is determined by a Data Review Committee (DRC) composed of AGR technical leads, Sitewide Quality Assurance (QA), and NDMAS analysts. For ATR Cycles 151A through 154B, the DRC convened on February 12, 2014, reviewed the data acquisition process, and considered whether the data met the requirements for data collection as specified in QA approved INL ART TDO data collection plans. The DRC also examined the results of NDMAS data testing and statistical analyses, and confirmed the qualification status of the data as given in this report. The qualification status of AGR-3/4 irradiation data during the first six cycles were previously reported in INL/EXT-14-31186 document. This report presents data qualification status for the entire AGR-3/4 irradiation.

  19. Boundaries of American Identity: Relations between Ethnic Group Prototypicality and Policy Attitudes

    Science.gov (United States)

    Huynh, Que-Lam; Devos, Thierry; Altman, Hannah R.

    2014-01-01

    We sought to document that the extent to which different ethnic groups are perceived as embodying the American identity is more strongly linked to anti-minority policy attitudes and acculturation ideologies among majority group members (European Americans) than among minority group members (Asian Americans or Latino/as). Participants rated 13 attributes of the American identity as they pertain to different ethnic groups, and reported their endorsement of policy attitudes and acculturation ideologies. We found a relative consensus across ethnic groups regarding defining components of the American identity. However, European Americans were perceived as more prototypical of this American identity than ethnic minorities, especially by European American raters. Moreover, for European Americans but not for ethnic minorities, relative ingroup prototypicality was related to anti-minority policy attitudes and acculturation ideologies. These findings suggest that for European Americans, perceptions of ethnic group prototypicality fulfill an instrumental function linked to preserving their group interests and limiting the rights afforded to ethnic minorities. PMID:26347578

  20. Boundaries of American Identity: Relations between Ethnic Group Prototypicality and Policy Attitudes.

    Science.gov (United States)

    Huynh, Que-Lam; Devos, Thierry; Altman, Hannah R

    2015-08-01

    We sought to document that the extent to which different ethnic groups are perceived as embodying the American identity is more strongly linked to anti-minority policy attitudes and acculturation ideologies among majority group members (European Americans) than among minority group members (Asian Americans or Latino/as). Participants rated 13 attributes of the American identity as they pertain to different ethnic groups, and reported their endorsement of policy attitudes and acculturation ideologies. We found a relative consensus across ethnic groups regarding defining components of the American identity. However, European Americans were perceived as more prototypical of this American identity than ethnic minorities, especially by European American raters. Moreover, for European Americans but not for ethnic minorities, relative ingroup prototypicality was related to anti-minority policy attitudes and acculturation ideologies. These findings suggest that for European Americans, perceptions of ethnic group prototypicality fulfill an instrumental function linked to preserving their group interests and limiting the rights afforded to ethnic minorities.

  1. Qualification of non-destructive examination for belgian nuclear reactor pressure vessel inspection

    International Nuclear Information System (INIS)

    Couplet, D.; Francoise, T.

    2001-01-01

    In Service Inspection (ISI) participates to the assessment of Nuclear Reactor Pressure Vessel Integrity. The performance of Non Destructive Examination (NDE) techniques must be demonstrated according to predefined objectives. The qualification process is essential to trust the reliability of the information provided by NDE. In Belgian Nuclear Power Plants, the qualification was conducted through a collaboration between the vendor and a technical group from the Electricity Utility. The important facts of this qualification will be presented: - the detailed definition of the inspection and qualifications objectives, based on a combination of the ASME code and the European Methodology for Qualification; - the systematic verification of the NDE performance and limitations, for each ISI objective, through an adequate combination of tests on blocks and technical justification; - the continuous improvement of the NDE procedure; - the feedback and the lessons learnt from site experience; - the necessary multi-disciplinary approach (NDE, degradation mechanisms, structural integrity)

  2. Impact of pre-conditioning on the qualification of safety-related equipment

    International Nuclear Information System (INIS)

    Isgro, J.R.

    1982-01-01

    This paper shares some recent experiences on the effects of preconditioning on the qualification of safety-related equipment not located in a harsh environment. Environmental and seismic qualification testing programs were conducted following the guidelines of IEEE 323-1974, IEEE 344-1975 and appropriate IEEE daughter standards, where available. The examples that follow will illustrate the degree of pre-conditioning of safety-related equipment qualified to the requirements of IEEE-323-1974, and its effect on the outcome of the qualification program

  3. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  4. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  5. System design package for SIMS prototype system 3, solar heating and domestic hot water

    Energy Technology Data Exchange (ETDEWEB)

    1978-11-01

    This report is a collation of documents and drawings that describe a prototype solar heating and hot water system using liquid flat plat collectors and a gas or electric furnace energy subsystem. The system was designed for installation into a single-family dwelling. The description, performance specification, subsystem drawings, verification plan/procedure, and hazard analysis of the system are packaged for evaluation of the system with information sufficient to assemble a similar system. The SIMS Prototype Heating and Hot Water System, Model Number 3 has been installed in a residence at Glendo State Park, Glendo, Wyoming.

  6. Proposal for SPS beam time for the baby MIND and TASD neutrino detector prototypes

    CERN Document Server

    Asfandiyarov, R.; Blondel, A.; Bogomilov, M.; Bross, A.; Cadoux, F.; Cervera, A.; Izmaylov, A.; Karadzhov, Y.; Karpikov, I.; Khabibulin, M.; Khotyantsev, A.; Kopylov, A.; Kudenko, Y.; Matev, R.; Mineev, O.; Musienko, Y.; Nessi, M.; Noah, E.; Rubbia, A.; Shaykiev, A.; Soler, P.; Tsenov, R.; Vankova-Kirilova, G.; Yershov, N.

    2015-01-01

    The design, construction and testing of neutrino detector prototypes at CERN are ongoing activities. This document reports on the design of solid state baby MIND and TASD detector prototypes and outlines requirements for a test beam at CERN to test these, tentatively planned on the H8 beamline in the North Area, which is equipped with a large aperture magnet. It is hoped that this will allow for the current proposal to be considered in light of the recently approved projects related to neutrino activities with the SPS in the North Area in the medium term 2015-2020.

  7. 25 CFR 117.26 - Expenses incurred pending qualification of an executor or administrator.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Expenses incurred pending qualification of an executor or... HAVE CERTIFICATES OF COMPETENCY § 117.26 Expenses incurred pending qualification of an executor or administrator. Pending the qualification of the executor or administrator of the estate of a deceased Indian of...

  8. Manufacturing of small-scale mock-ups and of a semi-prototype of the ITER Normal Heat Flux First Wall

    International Nuclear Information System (INIS)

    Banetta, S.; Zacchia, F.; Lorenzetto, P.; Bobin-Vastra, I.; Boireau, B.; Cottin, A.; Mitteau, R.; Eaton, R.; Raffray, R.

    2014-01-01

    This paper describes the manufacturing development and fabrication of reduced scale ITER First Wall (FW) mock-ups of the Normal Heat Flux (NHF) design, including a “semi-prototype” with a dimension of 305 mm × 660 mm, corresponding to about 1/6 of a full-scale panel. The activity was carried out in the framework of the pre-qualification of the European Domestic Agency (EU-DA or F4E) for the supply of the European share of the ITER First Wall. The hardware consists of three Upgraded (2 MW/m 2 ) Normal Heat Flux (U-NHF) small-scale mock-ups, bearing 3 beryllium tiles each, and of one Semi-Prototype, representing six full-scale fingers and bearing a total of 84 beryllium tiles. The manufacturing process makes extensive use of Hot Isostatic Pressing, which was developed over more than a decade during ITER Engineering Design Activity phase. The main manufacturing steps for the semi-prototype are described, with special reference to the lessons learned and the implications impacting the future fabrication of the full-scale prototype and the series which consists of 218 panels plus spares. In addition, a “tile-size” mock-up was manufactured in order to assess the performance of larger tiles. The use of larger tiles would be highly beneficial since it would allow a significant reduction of the panel assembly time

  9. The path from biomarker discovery to regulatory qualification

    CERN Document Server

    Goodsaid, Federico

    2013-01-01

    The Path from Biomarker Discovery to Regulatory Qualification is a unique guide that focuses on biomarker qualification, its history and current regulatory settings in both the US and abroad. This multi-contributed book provides a detailed look at the next step to developing biomarkers for clinical use and covers overall concepts, challenges, strategies and solutions based on the experiences of regulatory authorities and scientists. Members of the regulatory, pharmaceutical and biomarker development communities will benefit the most from using this book-it is a complete and practical guide to biomarker qualification, providing valuable insight to an ever-evolving and important area of regulatory science. For complimentary access to chapter 13, 'Classic' Biomarkers of Liver Injury, by John R. Senior, Associate Director for Science, Food and Drug Administration, Silver Spring, Maryland, USA, please visit the following site:  http://tinyurl.com/ClassicBiomarkers Contains a collection of experiences of different...

  10. Qualification of flat welding of nuclear fuel bars

    International Nuclear Information System (INIS)

    Romero C, J.; Rivera M, H.

    2001-01-01

    The qualification of flat welding consists in the process (procedures (11), instructions (5), specifications (4) and programs (3)) and equipment (systems (4), equipment (6)) with the Personal Qualification (operators and supervisors) that was done in simultaneous form and supported with test and training programs with its respective technical reports, liberated by the Quality Assurance Office of ININ. Moreover, specific procedures of process and personal qualification are realized with the respective supervision by Quality Assurance Office. For the process, 20 welding were realized as follow: 5 welding with maximum contributing of heat, 10 welding with nominal contributing of heat, 5 welding with minimum contributing of heat. The heat contributing for the qualification was done maximum, of increasing the welding current, diminishing the helium flux and the revolutions per minute of the bar, at the moment of welding, with respect to nominal values. In the minimum contributing of heat it is diminished the welding current, increasing the helium flux and the revolutions per minute of the bar with respect to nominal values. With the qualification it has been finished the development of flat welding with results which define an own method of ININ. It was implemented a pneumatic system, for the elimination of micron cracks. It was required a control of turn velocity of the bar of hundredth of revolution. Moreover the main welding parameters each 40 μs are acquired. Also it was automated completely the process to avoid possible human mistakes. The standard deviations of the values of the realized inspections in the quality, are lower. Process, equipment and personnel with their respective Quality reports and registries are qualified, as well as the Quality certificates of two operators and one supervisor. (Author)

  11. The Humanitarian Action Qualifications Framework: a quality assurance tool for the Humanitarian Sector

    Directory of Open Access Journals (Sweden)

    Bastiaan L. Aardema

    2014-07-01

    Full Text Available The article presents the European Universities on Professionalisation on Humanitarian Action (EUPRHA Project as an initiative that seeks to contribute to the professionalisation and quality assurance of the humanitarian sector. Its purpose is to explain the approach and the process leading to the development of the Humanitarian Action Qualifications Framework as an example of good practice for other sectors aiming at improving the recognition of qualifications as a precondition of academic and professional mobility. With this aim, it introduces the educational and humanitarian trends that led to this project: the move from transnational qualifications frameworks of which the European Qualifications Framework for Lifelong Learning (EQF is the best example to sectoral qualifications frameworks and the increasing demand from the sector seeking to determine the competencies and required skills of a professional humanitarian aid worker. Based on the EQF and the Tuning methodology the framework will act as a translating device to make national and sectoral qualifications more readable and promote humanitarian workers’ and learners’ mobility between countries and organisations. It will facilitate inter-system transparency and recognition of (non-formal and informal learning by linking occupations, skills, competences, and qualifications, thus benefiting the Humanitarian Sector as a whole.

  12. Global National Qualifications Framework Inventory: Country Cases from EU and ETF Partner Countries

    Science.gov (United States)

    Cedefop - European Centre for the Development of Vocational Training, 2013

    2013-01-01

    Certificates, diplomas and titles are commonly known as qualifications. Their purpose is to show employers, training providers, and individuals what the person holding the qualification has learned and can do. Every country issues many different qualifications, but for the European labor market to work as intended--that is for European citizens to…

  13. Policies and practices pertaining to the selection, qualification requirements, and training programs for nuclear-reactor operating personnel at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Culbert, W.H.

    1985-10-01

    This document describes the policies and practices of the Oak Ridge National Laboratory (ORNL) regarding the selection of and training requirements for reactor operating personnel at the Laboratory's nuclear-reactor facilities. The training programs, both for initial certification and for requalification, are described and provide the guidelines for ensuring that ORNL's research reactors are operated in a safe and reliable manner by qualified personnel. This document gives an overview of the reactor facilities and addresses the various qualifications, training, testing, and requalification requirements stipulated in DOE Order 5480.1A, Chapter VI (Safety of DOE-Owned Reactors); it is intended to be in compliance with this DOE Order, as applicable to ORNL facilities. Included also are examples of the documentation maintained amenable for audit

  14. Prototyping real-time systems

    OpenAIRE

    Clynch, Gary

    1994-01-01

    The traditional software development paradigm, the waterfall life cycle model, is defective when used for developing real-time systems. This thesis puts forward an executable prototyping approach for the development of real-time systems. A prototyping system is proposed which uses ESML (Extended Systems Modelling Language) as a prototype specification language. The prototyping system advocates the translation of non-executable ESML specifications into executable LOOPN (Language of Object ...

  15. Re-qualification of MTR-type fuel plates fabrication process

    International Nuclear Information System (INIS)

    Elseaidy, I.M.; Ghoneim, M.M.

    2010-01-01

    The fabricability issues with increased uranium loading due to use low enrichment of uranium (LEU), i.e. less than 20 % of U 235 , increase the problems which occur during compact manufacturing, roll bonding of the fuel plates, potential difficulty in forming during rolling process, mechanical integrity of the core during fabrication, potential difficulty in meat homogeneity, and the ability to fabricate plates with thicker core as a means of increasing total uranium loading. To produce MTR- type fuel plates with high uranium loading (HUL) and keep the required quality of these plates, many of qualification process must be done in the commissioning step of fuel fabrication plant. After that any changing of the fabrication parameters, for example changing of any of the raw materials, devises, operators, and etc., a re- qualification process should be done in order to keep the quality of produced plates. Objective of the present work is the general description of the activities to be accomplished for re-qualification of manufacturing MTR- type nuclear fuel plates. For each process to be re-qualified, a detailed of re-qualification process were established. (author)

  16. Emergency Management. Functional Area Qualification Standard

    National Research Council Canada - National Science Library

    2004-01-01

    .... In support of this goal, the competency requirements defined in the Technical Qualification Standards should be aligned with and integrated into the recruitment and staffing processes for technical positions...

  17. Qualification of quality testing personnel, in particular the training offered

    International Nuclear Information System (INIS)

    Knoedler, D.

    1980-01-01

    Personnel qualification is one of the most important tasks of quality assurance. The qualification is reached by professional education, by experience made on the job and by additional external and company-internal training. A determination of qualification requirements should cover only the general principles. Especially this should be considered specifying the requirements for theoretical knowledge and for examinations since the factor of relevant experience is difficult to be estimated by third parties. Equal principles apply for the personnel of the manufacturer, of the main contractor, of the utility and of the auhtorized inspectors' organizations. The detailed guidelines should be part of the internal QA-systems of the organizations involved. (orig.) [de

  18. Technical evaluation of seismic qualification of safety-related equipment

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yang Hui; Park, Heong Gee; Park, Yeong Seok [Univ. of Incheon, Incheon (Korea, Republic of)

    1994-04-15

    This study is purposed to evaluate the technical acceptability of the procedures and techniques of seismic qualifications which were performed for the YGN 3 and 4 safety-related equipment.This study is also targeted to suggest a systematized technical procedure guide for the effective performance and review of the seismic qualification, which reflects the most up-to-date licensing requirements and state-of the-art.

  19. Space qualification of an experimental two-phase flow thermal management system

    International Nuclear Information System (INIS)

    Koonmen, J.P.; Carswell, L.C.; Kvansnak, M.A.

    1991-01-01

    The Weapons Laboratory will launch a space experiment in March 1991 to investigate the effects of extended microgravity on two-phase (liquid/vapor) flow. The qualification process for the experimental flight system hardware differs significantly from the process used for complex, high cost, long life space systems. Some development, qualification, and acceptance tests normally included in the test program of an operational space system were omitted because of the low program cost and low consequence of experiment failure. Key environment and functional qualification tests were performed, however, in an effort to reduce the risk of failure inherent in any space mission. The environmental qualification program included short duration vacuum chamber tests, reduced gravity missions onboard a National Aeronautics and Space Administration (NASA) test aircraft, and a complete series of shock and vibration tests. The functional qualification program centered on thermal-hydraulic system performance tests and a complete check-out of the unique telemetry system used to retrieve the experimental data from the payload. The test program also contains a number of acceptance and prelaunch validation tests to be performed as final verification of payloads readiness for spaceflight

  20. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels

    International Nuclear Information System (INIS)

    Elfving, K.

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included

  1. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  2. Qualifications Frameworks and their conflicting social imaginaries of globalisation

    DEFF Research Database (Denmark)

    Sarauw, Laura Louise

    2013-01-01

    Critics of the European Bologna process often see it as a univocal standardization of higher education. By exploring how different qualifications frameworks currently project unlike imaginaries of and responses to globalisation, this article takes a different stance. As a key point, I argue...... that the well-known imaginary of globalisation as a change towards a more diverse and unforeseeable world, which calls for the development of flexible, lifelong learners with a broad knowledge base and strong democratic competencies that we find in the overarching qualifications framework of the Bologna process......, is a highly contested imaginary. In contrast, for example, the Danish qualifications framework of 2003 projects an imaginary of globalisation as a change towards a smaller and more predictable world, which enables a novel and more efficient alignment of the curriculum towards specific professional needs...

  3. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Qualifications of fixed-satellite space station licensees. 25.140 Section 25.140 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications...

  4. DATA QUALIFICATION REPORT: WATER-LEVEL DATA FROM THE NYE COUNTY EARLY WARNING DRILLING PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    F. H. Dove, P. Sanchez, and L. Saraka

    2000-04-21

    The objective of this work is to evaluate unqualified, water-level data gathered under the Nye County Early Warning Drilling Program (EWDP) and to determine whether the status of the data should be changed to ''qualified'' data in accordance with AP-SIII.2Q (Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data). The corroboration method (as defined in Attachment 2 of AP-SIII.2Q) was implemented to qualify water-level data from Nye County measurements obtained directly from the Nye County Nuclear Waste Repository Program Office (NWRPO). Comparison of United States Geological Survey (USGS) measurements contained in DTN GS990608312312.003 with the Nye County water-level data has shown that the differences in water-level altitudes for the same wells are significantly less than 1 meter. This is an acceptable finding. Evaluation and recommendation criteria have been strictly applied to qualify Nye County measurements of water levels in selected wells measured by the USGS. However, the process of qualifying measured results by corroboration also builds confidence that the Nye County method for measurement of water levels is adequate for the intended use of the data (which is regional modeling). Therefore, it is reasonable to extend the term of ''qualified'' to water-level measurements in the remaining Nye County Phase I wells on the basis that the method has been shown to produce adequate results for the intended purpose of supporting large-scale modeling activities for the Yucca Mountain Project (YMP). The Data Qualification Team recommends the Nye County, water-level data contained in Appendix D of this report be designated as ''qualified''. These data document manual measurements of water-levels in eight (8) EWDP Phase I drillholes that were obtained prior to the field installation of continuous monitoring equipment.

  5. DATA QUALIFICATION REPORT: WATER-LEVEL DATA FROM THE NYE COUNTY EARLY WARNING DRILLING PROGRAM

    International Nuclear Information System (INIS)

    F. H. Dove, P. Sanchez, and L. Saraka

    2000-01-01

    The objective of this work is to evaluate unqualified, water-level data gathered under the Nye County Early Warning Drilling Program (EWDP) and to determine whether the status of the data should be changed to ''qualified'' data in accordance with AP-SIII.2Q (Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data). The corroboration method (as defined in Attachment 2 of AP-SIII.2Q) was implemented to qualify water-level data from Nye County measurements obtained directly from the Nye County Nuclear Waste Repository Program Office (NWRPO). Comparison of United States Geological Survey (USGS) measurements contained in DTN GS990608312312.003 with the Nye County water-level data has shown that the differences in water-level altitudes for the same wells are significantly less than 1 meter. This is an acceptable finding. Evaluation and recommendation criteria have been strictly applied to qualify Nye County measurements of water levels in selected wells measured by the USGS. However, the process of qualifying measured results by corroboration also builds confidence that the Nye County method for measurement of water levels is adequate for the intended use of the data (which is regional modeling). Therefore, it is reasonable to extend the term of ''qualified'' to water-level measurements in the remaining Nye County Phase I wells on the basis that the method has been shown to produce adequate results for the intended purpose of supporting large-scale modeling activities for the Yucca Mountain Project (YMP). The Data Qualification Team recommends the Nye County, water-level data contained in Appendix D of this report be designated as ''qualified''. These data document manual measurements of water-levels in eight (8) EWDP Phase I drillholes that were obtained prior to the field installation of continuous monitoring equipment

  6. Technical qualification requirements and training programs for radiation protection personnel at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Copenhaver, E.D.; Houser, B.S.; Butler, H.M. Jr.; Bogard, J.S.; Fair, M.F.; Haynes, C.E.; Parzyck, D.C.

    1986-04-01

    This document deals with the policies and practices of the Environmental and Occupational Safety Division (EOSD) at the Oak Ridge National Laboratory (ORNL) in regard to the selection, training, qualification, and requalification of radiation protection staff assigned to reactor and nonreactor nuclear facilities. Included are personnel at facilities that: (1) operate reactors or particle accelerators; (2) produce, process, or store radioactive liquid or solid waste; (3) conduct separations operations; (4) engage in research with radioactive materials and radiation sources; and (5) conduct irradiated materials inspection, fuel fabrication, deconamination, or recovery operations. The EOSD personnel also have environmental surveillance and operational and industrial safety responsibilities related to the total Laboratory

  7. Students' qualification in environmental and sustainability education—epistemic gaps or composites of critical thinking?

    Science.gov (United States)

    Hasslöf, Helen; Lundegård, Iann; Malmberg, Claes

    2016-01-01

    In an 'age of measurement' where students' qualification is a hot topic on the political agenda, it is of interest to ask what the function of qualification might implicate in relation to a complex issue as Education for Sustainable Development (ESD) and what function environmental and sustainability issues serve in science education. This paper deals with how secondary and upper secondary teachers in discussions with colleagues articulate qualification in relation to educational aims of ESD. With inspiration from discourse theory, the teachers' articulations of qualification are analysed and put in relation to other functions of education (qualification, socialisation and subjectification). The results of this study show three discourses of qualification: scientific reasoning, awareness of complexity and to be critical. The discourse of 'qualification as to be critical' is articulated as a composite of differing epistemological views. In this discourse, the teachers undulate between rationalistic epistemological views and postmodern views, in a pragmatic way, to articulate a discourse of critical thinking which serves as a reflecting tool to bring about different ways of valuing issues of sustainability, which reformulates 'matter of facts' towards 'matter of concerns'

  8. Challenges of equipment qualification using today's standards with emphasis on a class 1E motor program

    International Nuclear Information System (INIS)

    Deaton, K.

    1995-01-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed

  9. Personnel Officers: Judging Their Qualifications.

    Science.gov (United States)

    Webb, Gisela

    1988-01-01

    Discusses the backgrounds and qualifications appropriate for a library personnel administrator, including (1) a master's degree in library science; (2) library work experience; (3) additional training in administration, personnel management, organizational development, and psychology; and (4) personal attributes such as good communication skills,…

  10. Mutual Recogniton of Professional Qualifications

    DEFF Research Database (Denmark)

    Enemark, Stig; Plimmer, Francis

    The publication aims to review the concept of mutual recognition of qualifications within the world wide surveying community, and to develop a framework for the introduction of standards of global professional competence in this area. The publication also includes a number of case studies from...

  11. Fatigue qualification of high thickness composite rotor components

    Science.gov (United States)

    Raggi, M.; Mariani, U.; Zaffaroni, G.

    Fatigue qualification aspects of composite rotor components are presented according with the safe life procedure usually applied by helicopter manufacturers. Test activities are identified at three levels of specimen complexity: coupon, structural element and full scale component. Particular attention is given to high thickness laminates qualification as far as environmental exposure is concerned. A practical approach for an accelerated conditioning procedure is described. The application to a main rotor tension link is presented showing the negligible effect of the moisture absorption on its fatigue strength.

  12. Earthquake experience and seismic qualification by indirect methods in nuclear installations

    International Nuclear Information System (INIS)

    2003-01-01

    In recent years, many operational nuclear power plants around the world have conducted seismic re-evaluation programmes either as part of a review of seismic hazards or to comply with best international nuclear safety practices. In this connection, Member States have called on the IAEA to carry out several seismic review missions at their plants, primarily those of WWER and RBMK design. One of the critical safety issues that arose during these missions was that of seismic qualification (determination of fitness for service) of already installed plant distribution systems, equipment and components. The qualification of new components, equipment and distribution systems cannot be replicated for equipment that is already installed and operational in plants, as this process is neither feasible nor appropriate. For this reason, seismic safety experts have developed new procedures for the qualification of installed equipment: these procedures seek to demonstrate that installed equipment, through a process of comparison with new equipment, is apt for service. However, these procedures require large sets of criteria and qualification databases and call for the use of engineering judgement and experience, all of which open the door to wide margins of interpretation. In order to guarantee a sound technical basis for the qualification of in-plant equipment, currently applied to 70% to 80% of all plant equipment, the regulatory review of this type of qualification process calls for a detailed assessment of the technical procedures applied. Such an assessment is the first step towards eliminating the risk of large differences in qualification results between different plants, operators and countries, and guaranteeing the reliability of seismic re-evaluation programmes. Bearing this in mind, in 1999, the IAEA convened a seminar and technical meeting on seismic qualification under the auspices of the IAEA Technical Co-operation programme. Altogether 66 senior experts attended the

  13. Sustained qualification process for full scope nuclear power plant simulators

    International Nuclear Information System (INIS)

    Pirson, J.; Stubbe, E.; Vanhoenacker, L.

    1994-01-01

    In the past decade, simulator training for all nuclear power plant operators has evolved into a vital requirement. To assure a correct training, the simulator qualification process is an important issue not only for the initial validation but also following major simulator updates, which are necessary during the lifetime of the simulator. In order to avoid degradation of the simulator validated software, the modifications have to be introduced according to a rigorous methodology and a practical requalification process has to be applied. Such methodology has to be enforced at every phase of the simulator construction or updating process from plant data package constitution, over simulator software development to simulator response qualification. The initial qualification and requalification process is based on the 3 levels identified by the ANSI/ANS 3-5 standard for steady-state, operational transients and accident conditions. For the initial certification of the full scope simulators in Belgium, a practical qualification methodology has been applied, which has been adapted into a set of non regression tests for the requalification after major simulator updates. (orig.) (4 refs., 3 figs.)

  14. Imagining the prototype

    OpenAIRE

    Brouwer, C. E.; Bhomer, ten, M.; Melkas, H.; Buur, J.

    2013-01-01

    This article reports on the analysis of a design session, employing conversation analysis. In the design session three experts and a designer discuss a prototype of a shirt, which has been developed with the input from these experts. The analysis focuses on the type of involvement of the participants with the prototype and how they explicate the points they make in the discussion with or without making use of the prototype. Three techniques for explicating design issues that exploit the proto...

  15. Patent documentation - comparison of two MT strategies

    DEFF Research Database (Denmark)

    Offersgaard, Lene; Povlsen, Claus

    2007-01-01

    This paper focuses on two matters: A comparison of how two different MT strategies manage translating the text type of patent documentation and a survey of what is needed to transform a MT research prototype system to a translation application for patent texts. The two MT strategies is represented....... The distinctive text type of patents pose special demands for machine translation and these aspects are discussed based on linguistic observations with focus on the users point of view. Two main demands are automatic pre processing of the documents and implementation of a module which in a flexible and user......-friendly manner offers the opportunity to extend the lexical coverage of the system. These demands and the comparison of the two MT strategies are discussed on the basis of proofread patents....

  16. Recognition techniques for extracting information from semistructured documents

    Science.gov (United States)

    Della Ventura, Anna; Gagliardi, Isabella; Zonta, Bruna

    2000-12-01

    Archives of optical documents are more and more massively employed, the demand driven also by the new norms sanctioning the legal value of digital documents, provided they are stored on supports that are physically unalterable. On the supply side there is now a vast and technologically advanced market, where optical memories have solved the problem of the duration and permanence of data at costs comparable to those for magnetic memories. The remaining bottleneck in these systems is the indexing. The indexing of documents with a variable structure, while still not completely automated, can be machine supported to a large degree with evident advantages both in the organization of the work, and in extracting information, providing data that is much more detailed and potentially significant for the user. We present here a system for the automatic registration of correspondence to and from a public office. The system is based on a general methodology for the extraction, indexing, archiving, and retrieval of significant information from semi-structured documents. This information, in our prototype application, is distributed among the database fields of sender, addressee, subject, date, and body of the document.

  17. The Changing Distribution of Teacher Qualifications Across Schools: A Statewide Perspective Post-NCLB

    Directory of Open Access Journals (Sweden)

    Karen J. DeAngelis

    2010-11-01

    Full Text Available A number of recent policy initiatives, including NCLB's highly qualified teacher provisions, have sought to improve the qualifications of teachers and their distribution across schools. Little is known, however, about the impact of these policies. In this study, we use population data on teachers and schools in Illinois to examine changes in the level and distribution of teacher qualifications from 2001 to 2006. We find that schools in Chicago, especially those serving the highest percentages of low-income and minority students, experienced the greatest improvements in teacher qualifications during the period. In addition, high-poverty schools in most other locales in the state registered small to moderate improvements, which narrowed the gap in teacher qualifications between high- and low-poverty schools across Illinois. Improvements in the certification status of experienced teachers and the recruitment of new teachers with stronger academic qualifications both contributed to these gains. The results reveal a tradeoff for disadvantaged schools seeking to improve both teacher qualifications and teacher experience levels, thereby calling into question the near-term feasibility of NCLB provisions that aim to simultaneously eliminate inequities across schools in both.       

  18. 7 CFR 4290.360 - Initial review of Applicant's management team's qualifications.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Initial review of Applicant's management team's...'s management team's qualifications. The Secretary will review the information submitted by the Applicant concerning the qualifications of the Applicant's management team to determine in his or her sole...

  19. Qualification and certification in NDT

    International Nuclear Information System (INIS)

    Hassan Kavarodi Maracair

    2003-01-01

    Ruane-TATI Sdn Bhd was the first accredited training centre in Asia approved by The British Institute of Non Destructive Testing (BINDT) as per EN 473, ISO 9712 and EN 45013 requirements. Meanwhile, Ruane-TATI is also accredited by National Vocational Training Center ( MLVK ).This mean that Ruane-TATI is the first training and examination center that accredited by both international and national bodies in providing quality , qualification and certification for comprehensive training and examination in Inspection and Non Destructive Testing (NDT). There are several NDT examinations scheme available in Malaysia due to differences requirement from the industrials. This has put the difficulties to services company in upgrading their NDT technician qualifications. The intention of this paper is to discuss the basic different among the NDT examinations scheme used in Malaysia ( mostly offered by Ruane-TATI ) and the development of certain schemes in covering their schemes to more sectors and NDT methods. (Author)

  20. Novel qualification methodology for subsea processing

    Energy Technology Data Exchange (ETDEWEB)

    Nilsen, Paal Jahre; Bratfos, Hans A. [Det Norske Veritas, Oslo (Norway)

    2004-07-01

    The purpose of the Reliability Analysis is to quantify the overall reliability of the technology to confirm that the functional requirements and the target reliability laid down in the Qualification Basis are met. On this basis DNV may issue a Statement of Fitness for Service affirming that the technology is considered qualified. Although a technology may be convincingly proven fit for service without using reliability measures, a quantified reliability makes the technology more competitive in a business where profitability is directly related to the reliability of the technology. In this respect it should also be noted that a reliability analysis require specific input data that sometimes must be derived by testing. It is therefore important to take this into consideration already in the selection and planning of qualification methods. (author)

  1. Policies and practices pertaining to the selection, qualification requirements, and training programs for nuclear-reactor operating personnel at the Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Culbert, W.H.

    1985-10-01

    This document describes the policies and practices of the Oak Ridge National Laboratory (ORNL) regarding the selection of and training requirements for reactor operating personnel at the Laboratory's nuclear-reactor facilities. The training programs, both for initial certification and for requalification, are described and provide the guidelines for ensuring that ORNL's research reactors are operated in a safe and reliable manner by qualified personnel. This document gives an overview of the reactor facilities and addresses the various qualifications, training, testing, and requalification requirements stipulated in DOE Order 5480.1A, Chapter VI (Safety of DOE-Owned Reactors); it is intended to be in compliance with this DOE Order, as applicable to ORNL facilities. Included also are examples of the documentation maintained amenable for audit.

  2. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2001-01-01

    The overall training system and the development of projects for training of all categories of NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce staff were the subject of Nuclear Regulatory Authority of the Slovak Republic (UJD) attention. During 2000, the following inspections were carried out on nuclear personnel training: (a) NPP Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff ; (b) NPP Mochovce: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; an inspection focused on verifying the simulator aided training; an inspection focused on checking the preparedness of NPP Mochovce operation and technical personnel for NPP Mochovce Unit 2 operation; (c) Technology for treatment and conditioning of radioactive waste Bohunice (BSC): an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff; VUJE Trnava: verification of technical equipment and professional skills of VUJE Trnava staff and tasks arising out of the 'Authorisation on nuclear installation staff training'. Examinations of selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPPs. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under

  3. Data Qualification guidelines

    International Nuclear Information System (INIS)

    Edwards, T.B.; Shine, E.P.

    1992-01-01

    Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process

  4. Nuclear power reactor security personnel training and qualification plan reviewer workbook

    International Nuclear Information System (INIS)

    1979-06-01

    The Training and Qualification Plan Reviewer Workbook has been developed to provide the information required for evaluating the adequacy of the Training and Qualification (T and Q) Plans developed to meet the requirements of 10 CFR 73.55(b)(4) and 10 CFR 73, Appendix B

  5. Seismic and dynamic qualification methods

    International Nuclear Information System (INIS)

    Lin, C.W.

    1985-01-01

    This book presents the papers given at a conference on seismic effects on nuclear power plants. Topics considered at the conference included seismic qualification of equipment, multifrequency test methodologies, damping in piping systems, the amplification factor, thermal insulation, welded joints, and response factors for seismic risk analysis of piping

  6. 46 CFR 68.7 - Qualification as an 883-1 corporation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Qualification as an 883-1 corporation. 68.7 Section 68.7... Trade § 68.7 Qualification as an 883-1 corporation. (a) To be formally qualified as an 883-1 corporation for all purposes under the Act, a corporation which meets the requirements of § 68.5 must file with...

  7. Qualification of code-Saturne for thermal-hydraulics single phase nuclear applications

    International Nuclear Information System (INIS)

    Archambeau, F.; Bechaud, C.; Gest, B.; Martin, A.; Sakiz, M.

    2003-01-01

    Code-Saturne is a general finite volume CFD (computational fluid dynamics) code developed by Electricite de France (EDF) under quality assurance for 2- and 3-dimensional simulations, laminar and turbulent flows, conjugate heat transfer (coupling with thermal code SYRTHES), including combustion modelling and a Lagrangian module. A very large range of meshes can be used. The solver relies on a finite volume method on arbitrary meshes (hybrid, with hanging nodes, any type of element). All variables are located at the cell centres. The solver is time marching, with a predictor-corrector scheme for Navier-Stokes equations. Standard Reynolds Average Navier-Stokes modelling (RANS) is included (k-epsilon, RSM). Code-Saturne is used by EDF in various industrial fields such as process engineering, aeraulics, combustion and nuclear applications. The present paper describes the qualification phase carried out during 2001 for single-phase nuclear applications. Indeed, once an industrial product has been released and validated, it is of major importance, especially in this particular field related to safety matters, to demonstrate the ability of the code to help engineers produce satisfactory conclusions to industrial problems. In coherence with analyses and best practice guidelines such as those published by the ERCOFTAC Special Interest Group, it seemed important to base the qualification phase on well defined and documented experimental facilities, sufficiently complex to be representative of industrial studies. Much attention has been devoted to evaluating sensitivity to numerical parameters such as grid refinement, time step... Moreover, the qualification studies have been carried out in real-life conditions, that is in limited time, with industrial limitations on the number of grid cells, and by the teams usually producing such studies, so as to integrate a real industrial process in the qualification phase. Two test cases chosen to assess certain types of flows in PWR

  8. Supporting Active User Involvment in Prototyping

    DEFF Research Database (Denmark)

    Grønbæk, Kaj

    1990-01-01

    The term prototyping has in recent years become a buzzword in both research and practice of system design due to a number of claimed advantages of prototyping techniques over traditional specification techniques. In particular it is often stated that prototyping facilitates the users' involvement...... in the development process. But prototyping does not automatically imply active user involvement! Thus a cooperative prototyping approach aiming at involving users actively and creatively in system design is proposed in this paper. The key point of the approach is to involve users in activities that closely couple...... development of prototypes to early evaluation of prototypes in envisioned use situations. Having users involved in such activities creates new requirements for tool support. Tools that support direct manipulation of prototypes and simulation of behaviour have shown promise for cooperative prototyping...

  9. Radiation protection technology. Specific course for authorized radiation protection representatives according the qualification guidelines technology for the radiation protection regulations (StrlSchV) and X-ray regulation (RoeV). 2. rev. ed.

    International Nuclear Information System (INIS)

    Rahn, Hans-Joachim

    2012-01-01

    The specific course for authorized radiation protection representatives according the qualification guidelines technology for the radiation protection regulations (StrlSchV) and X-ray regulation (RoeV). Covers the following issues: radiation protection - generally; licenses and notifications; scientific fundamentals; dosimetry, surveillance, control, documentation; technical radiation protection; radiation protection calculations.

  10. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    The overall training system and the development projects of training the staff of all categories from NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce were the subject of UJD's attention. During 2001 following inspections were carried out on nuclear personnel training: - PP's Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff; - Mochovce NPP: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; - SE-VYZ: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff. Training the staff of the NPP's Bohunice: - The fundamental and periodical theoretical training as sure as the fundamental and periodical simulator training is carried out by the VUJE Training centre in Trnava. - The fundamental practical training in the workplace and training for the change work- rank is carried at Bohunice plant. Training of the staff of the NPP Mochovce: - The fundamental and periodical theoretical training is carried out by the VUJE Training centre in Trnava. The fundamental practical training in the workplace and training for the change work- rank as well as the fundamental and periodical simulator training is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues a certificate on special professional skills of selected staff members of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: 1. Scientific shift manager for start up with the right of manipulation; 2. Shift supervisor; 3. Unit supervisor; 4. Primary circuit operator; 5. Secondary circuit operator; 6. Reactor physicist; 7. Scientific shift manager for start up without the right of manipulation. Examinations of

  11. Engineering prototypes for theta-pinch devices

    International Nuclear Information System (INIS)

    Hansborough, L.D.; Hammer, C.F.; Hanks, K.W.; McDonald, T.E.; Nunnally, W.C.

    1975-01-01

    Past, present, and future engineering prototypes for theta-pinch plasma-physics devices at Los Alamos Scientific Laboratory are discussed. Engineering prototypes are designed to test and evaluate all components under system conditions expected on actual plasma-physics experimental devices. The importance of engineering prototype development increases as the size and complexity of the plasma-physics device increases. Past experiences with the Scyllac prototype and the Staged Theta-Pinch prototype are discussed and evaluated. The design of the proposed Staged Scyllac prototype and the Large Staged Scyllac implosion prototype assembly are discussed

  12. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  13. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  14. The qualification of electrical components and instrumentations relevant to safety

    International Nuclear Information System (INIS)

    Zambardi, F.

    1989-03-01

    Systems and components relevant to safety of nuclear power plants must maintain their functional integrity in order to assure accident prevention and mitigation. Redundancy is utilized against random failures, nevertheless care must be taken to avoid common failures in redundant components. Main sources of degradation and common cause failures consist in the aging effects and in the changes of environmental conditions which occur during the plant life and the postulated accidents. These causes of degradation are expected to be especially significant for instrumentation and electrical equipment, which can have a primary role in safety systems. The qualification is the methodology by which component safety requirements can be met against the above mentioned causes of degradation. In this report the connection between the possible, plant conditions and the resulting degradation effects on components is preliminarily addressed. A general characterization of the qualification is then presented. Basis, methods and peculiar aspects are discussed and the qualification by testing is taken into special account. Technical and organizational aspects related to a plant qualification program are also focused. The report ends with a look to the most significant research and development activities. (author)

  15. Biomarkers as drug development tools: discovery, validation, qualification and use.

    Science.gov (United States)

    Kraus, Virginia B

    2018-06-01

    The 21st Century Cures Act, approved in the USA in December 2016, has encouraged the establishment of the national Precision Medicine Initiative and the augmentation of efforts to address disease prevention, diagnosis and treatment on the basis of a molecular understanding of disease. The Act adopts into law the formal process, developed by the FDA, of qualification of drug development tools, including biomarkers and clinical outcome assessments, to increase the efficiency of clinical trials and encourage an era of molecular medicine. The FDA and European Medicines Agency (EMA) have developed similar processes for the qualification of biomarkers intended for use as companion diagnostics or for development and regulatory approval of a drug or therapeutic. Biomarkers that are used exclusively for the diagnosis, monitoring or stratification of patients in clinical trials are not subject to regulatory approval, although their qualification can facilitate the conduct of a trial. In this Review, the salient features of biomarker discovery, analytical validation, clinical qualification and utilization are described in order to provide an understanding of the process of biomarker development and, through this understanding, convey an appreciation of their potential advantages and limitations.

  16. Challenges of equipment qualification using today`s standards with emphasis on a class 1E motor program

    Energy Technology Data Exchange (ETDEWEB)

    Deaton, K.

    1995-02-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed.

  17. The new lattice code Paragon and its qualification for PWR core applications

    International Nuclear Information System (INIS)

    Ouisloumen, M.; Huria, H.C.; Mayhue, L.T.; Smith, R.M.; Kichty, M.J.; Matsumoto, H.; Tahara, Y.

    2003-01-01

    Paragon is a new two-dimensional transport code based on collision probability with interface current method and written entirely in Fortran 90/95. The qualification of Paragon has been completed and the results are very good. This qualification included a number of critical experiments. Comparisons to the Monte Carlo code MCNP for a wide variety of PWR assembly lattice types were also performed. In addition, Paragon-based core simulator models have been compared against PWR plant startup and operational data for a large number of plants. Some results of these calculations and also comparisons against models developed with a licensed Westinghouse lattice code, Phoenix-P, are presented. The qualification described in this paper provided the basis for the qualification of Paragon both as a validated transport code and as the nuclear data source for core simulator codes

  18. Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

    Science.gov (United States)

    Ramesham, Rajeshuni; Amaro, Luis R.; Brown, Paula R.; Usiskin, Robert; Prater, Jack L.

    2013-01-01

    A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

  19. Leaving school without qualifications and mental health problems to age 30.

    Science.gov (United States)

    Fergusson, David M; McLeod, Geraldine F H; Horwood, L John

    2015-03-01

    To examine the associations between leaving school without qualifications and subsequent mental health to age 30, using data gathered over the course of a 30-year longitudinal study. Data were gathered over the course of a 30-year study (Christchurch Health and Development Study) of a birth cohort of 1265 children, born in Christchurch in 1977. This cohort has been studied on 22 occasions from birth to age 30. As part of this study, information was gathered on: (a) school leaving qualifications, (b) mental health problems from 18 to 30; and (c) prospectively assessed childhood and adolescent factors including: child and family background; family violence and child abuse; and adolescent mental health problems. Leaving school without qualifications was associated with increased risks of subsequent: major depression (OR = 1.37 at 95 % CI 1.05-1.78, p = 0.019); anxiety disorder (OR = 1.99 at 95 % CI 1.55-2.57, p mental health problems) reduced these associations substantially and to the point of statistical non-significance. The findings of this study suggest that there was no direct causal association between leaving school without qualifications and subsequent mental health problems. Associations were explained by the linkages between leaving school without qualifications and: child and family social background; and mental health around the point of school leaving.

  20. EPCiR prototype

    DEFF Research Database (Denmark)

    2003-01-01

    A prototype of a residential pervasive computing platform based on OSGi involving among other a mock-up of an health care bandage.......A prototype of a residential pervasive computing platform based on OSGi involving among other a mock-up of an health care bandage....

  1. Forced Attention to Specific Applicant Qualifications: Impact on Physical Attractiveness and Sex of Applicant Biases.

    Science.gov (United States)

    Cann, Arnie; And Others

    1981-01-01

    Undergraduates evaluated the qualifications of an attractive, average, or unattractive male or female applicant. Ratings of specific qualifications preceded or followed an overall and hiring decision rating. The order variable influenced ratings of specific qualifications but not the overall or hiring decision. Male and attractive applicants were…

  2. Fast-prototyping of VLSI

    International Nuclear Information System (INIS)

    Saucier, G.; Read, E.

    1987-01-01

    Fast-prototyping will be a reality in the very near future if both straightforward design methods and fast manufacturing facilities are available. This book focuses, first, on the motivation for fast-prototyping. Economic aspects and market considerations are analysed by European and Japanese companies. In the second chapter, new design methods are identified, mainly for full custom circuits. Of course, silicon compilers play a key role and the introduction of artificial intelligence techniques sheds a new light on the subject. At present, fast-prototyping on gate arrays or on standard cells is the most conventional technique and the third chapter updates the state-of-the art in this area. The fourth chapter concentrates specifically on the e-beam direct-writing for submicron IC technologies. In the fifth chapter, a strategic point in fast-prototyping, namely the test problem is addressed. The design for testability and the interface to the test equipment are mandatory to fulfill the test requirement for fast-prototyping. Finally, the last chapter deals with the subject of education when many people complain about the lack of use of fast-prototyping in higher education for VLSI

  3. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  4. Qualification Procedures of the CMS Pixel Barrel Modules

    CERN Document Server

    Starodumov, A; Horisberger, R.; Kastli, H.Chr.; Kotlinski, D.; Langenegger, U.; Meier, B.; Rohe, T.; Trueb, P.

    2006-01-01

    The CMS pixel barrel system will consist of three layers built of about 800 modules. One module contains 66560 readout channels and the full pixel barrel system about 48 million channels. It is mandatory to test each channel for functionality, noise level, trimming mechanism, and bump bonding quality. Different methods to determine the bump bonding yield with electrical measurements have been developed. Measurements of several operational parameters are also included in the qualification procedure. Among them are pixel noise, gains and pedestals. Test and qualification procedures of the pixel barrel modules are described and some results are presented.

  5. Qualification and testing of CT systems

    DEFF Research Database (Denmark)

    Bartscher, Markus; Neuschaefer-Rube, Ulrich; Illemann, Jens

    2018-01-01

    This chapter focuses on system verification and conformance to specifications. System qualification is carried out to ensure that the system and itscomponents achieve the best performance—usually corresponding to the specificationsmade by the manufacturer. Acceptance and reverification testing ar...

  6. 15 CFR 40.2 - Qualifications.

    Science.gov (United States)

    2010-01-01

    ... Qualifications. (a) To be eligible for a training grant at the Bureau of the Census the applicant must be: (1) A... training programs. (2) Able to speak, read, write, and understand the English language. (3) Sponsored by his government either directly with the United States or through a public international agency. (4...

  7. Evaluation and qualification of novel control techniques with safety requirements

    International Nuclear Information System (INIS)

    Gossner, S.; Wach, D.

    1985-01-01

    The paper discusses the questions related to the assessment and qualification of new I and C-systems. The tasks of nuclear power plant I and Cs as well as the efficiency of the new techniques are reflected. Problems with application of new I and Cs and the state of application in Germany and abroad are addressed. Starting from the essential differencies between conventional and new I and C-systems it is evaluated, if and in which way existing safety requirements can be met and to what extent new requirements need to be formulated. An overall concept has to be developed comprising the definition of graded requirement profiles for design and qualification. Associated qualification procedures and tools have to be adapted, developed and tuned upon each other. (orig./HP) [de

  8. Qualification of conditioning process

    International Nuclear Information System (INIS)

    Wolf, J.

    1989-01-01

    A conditioning process is qualified by the PTB if the execution of pre-treatment and conditioning occurs so that a safe and orderly final storage of the products and waste containers produced can be assumed. All the relevant operating conditions for the plant are laid down by the producer/conditioner of the waste in a handbook. The elements of product inspection by process qualification are shown in tabular form. (DG) [de

  9. Visas and qualifications: Syrian refugees in Brazil

    Directory of Open Access Journals (Sweden)

    Gilberto M A Rodrigues

    2017-10-01

    Full Text Available Brazil’s humanitarian visa programme for Syrian refugees and its efforts to recognise their qualifications could offer lessons for refugee protection and integration across the region.

  10. Technical basis for environmental qualification of computer-based safety systems in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Tanaka, T.J.; Antonescu, C.E.

    1997-01-01

    This paper summarizes the results of research sponsored by the US Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. This research was conducted by the Oak Ridge National Laboratory (ORNL) and Sandia National Laboratories (SNL). ORNL investigated potential failure modes and vulnerabilities of microprocessor-based technologies to environmental stressors, including electromagnetic/radio-frequency interference, temperature, humidity, and smoke exposure. An experimental digital safety channel (EDSC) was constructed for the tests. SNL performed smoke exposure tests on digital components and circuit boards to determine failure mechanisms and the effect of different packaging techniques on smoke susceptibility. These studies are expected to provide recommendations for environmental qualification of digital safety systems by addressing the following: (1) adequacy of the present preferred test methods for qualification of digital I and C systems; (2) preferred standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging in qualification testing for equipment that is to be located in mild environments; and (5) determination of an appropriate approach to address smoke in a qualification program

  11. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...

  12. Round table discussion " Development of qualification framework in meteorology (TEMPUS QUALIMET)"

    Science.gov (United States)

    Bashmakova, I.; Belotserkovsky, A.; Karlin, L.; Petrosyan, A.; Serditova, N.; Zilitinkevich, S.

    2010-09-01

    The international consortium has started implementing a project aimed at the development of unified framework of qualifications in meteorology (QualiMet), setting a system of recognition and award of qualifications up to Doctoral level based on standards of knowledge, skill and competence acquired by learners is underway. The QualiMet has the following specific objectives: 1. To develop standards of knowledge, skills and competence for all qualifications up to Doctoral level needed in all possible occupations meteorology learner can undertake, by July 2011 2. To develop reciprocally recognized rubrics, criteria, methods and tools for assessing the compliance with the developed standards (quality assurance), by July 2012 3. To set the network of Centers of Excellence as the primary designer of sample education programs and learning experiences, both in brick-and-mortar and distant setting of delivery, leading to achievement of the developed standards, by December 2012 4. To set a system of mutual international recognition and award of qualifications in meteorology based on the developed procedures and establishment of self-regulatory public organization, by December 2012 The main beneficiaries of the project are: 1. Meteorology learners from the consortium countries. They will be able to make informed decisions about available qualification choices and progression options and provided an opportunity for students and graduates to participate in the system of international continuous education. 2. Meteorology employers from the consortium countries, They will be able to specify the level of knowledge, skill and competence required for occupational roles, evaluate qualifications presented, connect training and development with business needs. 3. Students and academic staff of all the consortium members, who will gain the increased mobility and exchange the fluxes of culturally and institutionally diversified lecturers and qualified specialists

  13. Developing e-banking services for rural India: making use of socio-technical prototypes

    OpenAIRE

    Dittrich, Yvonne; Vaidyanathan, Lakshmi; Gonsalves, Timothy A; Jhunjhunwala, Ashok

    2017-01-01

    Information and Communication Technology (ICT) is one of the key enablers for including underserved communities in economic and societal development across the world. Our research analyzes several banking service projects developing technical solutions for rural India. This poster presents an experience report based on systematic debriefing of involved project leaders and initiators, triangulated with additional documentation. The concept of Socio-Technical Prototype is developed and used to ...

  14. Appointment, qualifications and responsibilities of ventilation officers

    International Nuclear Information System (INIS)

    1981-01-01

    The Code provides for the appointment of a ventilation officer when required by the appropriate authority. This guideline offers comment on the appointment, qualifications, training and responsibilities of that person

  15. The future of community pharmacy practice in South Africa in the light of the proposed new qualification for pharmacists: implications and challenges.

    Science.gov (United States)

    Malangu, Ntambwe

    2014-08-15

    Community or retail pharmacies are regarded as one of the most common sources of health services throughout the world. In South Africa, community pharmacies have been providing some primary health care services to clients who could afford to pay. These services included screening, family planning, and emergency care for minor ailments. With the introduction of the new qualification, community pharmacies are poised to become providers of expanded services.  This paper describes the contents, the implications and challenges of the new qualification in light with future directions for community pharmacy practice in South Africa. Its purpose is to inform relevant stakeholders in South Africa and those outside South Africa that may pursue similar offerings. Published papers were identified through searches in MEDLINE and Google Scholar using a combination of search terms, namely: 'community, retail pharmacy, pharmacist/non-medical prescribing, South Africa'. Only articles published in English were considered. In addition, documents from the Ministry of Health of South Africa, the South African Pharmacy Council and curricula materials from schools of pharmacy were also reviewed. Laureates of the new qualification will essentially have the right to examine, diagnose, prescribe and monitor the treatment of their clients or patients. In doing so, this expanded function of prescribing for primary healthcare will imply several practice and infrastructural adjustments; and with many challenges laying ahead in need to be addressed. In conclusion, the authorized pharmacist prescriber qualification augurs a new era for community pharmacy practice in South Africa. This has many implications and some challenges that need to be managed. The pharmacy profession, academia, legislators and political decision-makers need to work together to resolve outstanding issues in a constructive manner.

  16. Prototypes as Platforms for Participation

    DEFF Research Database (Denmark)

    Horst, Willem

    developers, and design it accordingly. Designing a flexible prototype in combination with supportive tools to be used by both interaction designers and non-designers during development is introduced as a way to open up the prototyping process to these users. Furthermore I demonstrate how such a flexible...... on prototyping, by bringing to attention that the prototype itself is an object of design, with its users and use context, which deserves further attention. Moreover, in this work I present concrete tools and methods that can be used by interaction designers in practice. As such this work addresses both......The development of interactive products in industry is an activity involving different disciplines – such as different kinds of designers, engineers, marketers and managers – in which prototypes play an important role. On the one hand, prototypes can be powerful boundary objects and an effective...

  17. 1994 report on Tasks 4.3.1 and 4.3.2: Survey of anticipated requirements and qualification requirements for OSS

    International Nuclear Information System (INIS)

    Silvani, V.

    1995-01-01

    This is a preliminary report summarizing some topics related to the survey on functional and qualification requirements of Operator Support Systems (OSS's) in NPP's. This document has been prepared on the basis of the information presented in the previous meetings of this CRP working group. Additional information are expected when the answers to the working group questionnaire will be available. Functionalities examined are those referring to system functions and user's needs; technology trends are also considered. For practical purposes this document is divided in the followings: Summary of major OSS requirements and related problems as derived from the existing literature; appendix 1 reporting a summary of major functions performed by the OSS's presently in operation or under development in laboratories; appendix 2 reporting the list of standards for critical software. 18 refs, tabs

  18. Manufacturing and testing of full scale prototype for ITER blanket shield block

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sa-Woong, E-mail: swkim12@nfri.re.kr [ITER Korea, National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Duck-Hoi; Jung, Hun-Chea [ITER Korea, National Fusion Research Institute, Daejeon (Korea, Republic of); Lee, Sung-Ki [WONIL Co., Ltd., Haman (Korea, Republic of); Kang, Sung-Chan [POSCO Specialty Steel Co., Ltd., Changwon (Korea, Republic of); Zhang, Fu; Kim, Byoung-Yoon [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Ahn, Hee-Jae; Lee, Hyeon-Gon; Jung, Ki-Jung [ITER Korea, National Fusion Research Institute, Daejeon (Korea, Republic of)

    2015-04-15

    Highlights: • 316L(N)-IG forged steel was successfully fabricated and qualified. • Related R&D activities were implemented to resolve the fabrication issues. • SB #8 FSP was successfully manufactured with conventional fabrication techniques. • All of the validation tests were carried out and met the acceptance criteria. - Abstract: Based on the preliminary design of the ITER blanket shield block (SB) #8, the full scale prototype (FSP) has been manufactured and tested in accordance with pre-qualification program, and related R&D was performed to resolve the technical issues of fabrication. The objective of the SB pre-qualification program is to demonstrate the acceptable manufacturing quality by successfully passing the formal test program. 316L(N)-IG stainless steel forging blocks with 1.80L × 1.12W × 0.43t (m) were developed by using an electric arc furnace, and as a result, the material properties were satisfied with technical specification. In the course of applying conventional fabrication techniques such as cutting, milling, drilling and welding of the forged stainless steel block for the manufacturing of the SB #8 FSP, several technical problems have been addressed. And also, the hydraulic connector of cross-forged material re-melted by electro slag or vacuum arc requires the application of advanced joining techniques such as automatic bore TIG and friction welding. Many technical issues – drilling, welding, slitting, non-destructive test and so on – have been raised during manufacturing. Associated R&D including the computational simulation and coupon testing has been done in collaboration with relevant industries in order to resolve these engineering issues. This paper provides technical key issues and their possible resolutions addressed during the manufacture and formal test of the SB #8 FSP, and related R&D.

  19. Who Can Be President of the United States?: Candidate Hillary Clinton and the Problem of Statutory Qualifications

    Directory of Open Access Journals (Sweden)

    Tillman Seth Barrett

    2016-04-01

    Full Text Available Qualifications for public office restrict democratic choice, but such restrictions have a long pedigree in many jurisdictions. For example, the U.S. Constitution sets out qualifications for elected federal officials: i.e., Representative, Senator, President, and Vice President. Qualifications for those positions include provisions relating to age, citizenship, and residence. It has been long debated whether these textual qualifications are exclusive (i.e., floors and ceilings or whether they are merely floors, which can be supplemented by additional qualifications imposed by Congress or by the States.

  20. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  1. Development Of A Macro-Batch Qualification Strategy For The Hanford Tank Waste Treatment And Immobilization Plant

    International Nuclear Information System (INIS)

    Herman, Connie C.

    2013-01-01

    The Savannah River National Laboratory (SRNL) has evaluated the existing waste feed qualification strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) based on experience from the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) waste qualification program. The current waste qualification programs for each of the sites are discussed in the report to provide a baseline for comparison. Recommendations on strategies are then provided that could be implemented at Hanford based on the successful Macrobatch qualification strategy utilized at SRS to reduce the risk of processing upsets or the production of a staged waste campaign that does not meet the processing requirements of the WTP. Considerations included the baseline WTP process, as well as options involving Direct High Level Waste (HLW) and Low Activity Waste (LAW) processing, and the potential use of a Tank Waste Characterization and Staging Facility (TWCSF). The main objectives of the Hanford waste feed qualification program are to demonstrate compliance with the Waste Acceptance Criteria (WAC), determine waste processability, and demonstrate unit operations at a laboratory scale. Risks to acceptability and successful implementation of this program, as compared to the DWPF Macro-Batch qualification strategy, include: Limitations of mixing/blending capability of the Hanford Tank Farm; The complexity of unit operations (i.e., multiple chemical and mechanical separations processes) involved in the WTP pretreatment qualification process; The need to account for effects of blending of LAW and HLW streams, as well as a recycle stream, within the PT unit operations; and The reliance on only a single set of unit operations demonstrations with the radioactive qualification sample. This later limitation is further complicated because of the 180-day completion requirement for all of the necessary waste feed qualification steps. The primary recommendations/changes include the

  2. URGENT AND LAG PSYCHOPHYSIOLOGICAL EFFECTS NEUROFEEDBACK IN SPORTSMEN OF HIGH QUALIFICATION

    Directory of Open Access Journals (Sweden)

    O. V. Kaigorodtseva

    2013-01-01

    Full Text Available The article provides a comparative analysis of the psychophysiological state of sportsmen of high qualification within one year after the course neurofeedback. These data demonstrated that high qualification sportsmen physiological effects of training persist throughout the year and depend on the ability to arbitrarily increase the power of the alpha rhythm of the brain.

  3. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    Energy Technology Data Exchange (ETDEWEB)

    Chang, C.K., E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of); Lee, K.J., E-mail: klee@khu.ac.kr [Kyung Hee Univ., Seoul (Korea, Republic of)

    2014-07-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  4. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    International Nuclear Information System (INIS)

    Chang, C.K.; Lee, K.J.

    2014-01-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  5. Methodology for qualification of in-service inspection systems for WWER nuclear power plants. A publication of the extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

    International Nuclear Information System (INIS)

    1998-03-01

    Program was initiated by IAEA in 1990 with the aim to assist the countries of Central and Eastern Europe and former Soviet Union in evaluating the safety of their first generation WWER-440/230 nuclear power plants. The main objectives were: to identify major design and operational safety issues; to establish international consensus on priorities for safety improvements; and to provide assistance in the review of the competence and and adequacy of safety improvement programs. The scope was extended in 1992 to include RBMK, WWER-440/312 and WWER-1000 plants in operation and under construction. Integrity of primary circuit is fundamental for the safe operation of any nuclear power plant. In-service inspection (ISI) in general terms and in particular, non-destructive tests (NDT) play a key role in maintaining primary circuit integrity. This report provides a methodology for qualification of ISI systems which might be used by WWER operating countries as a commonly accepted basis for further development of the necessary qualification related infrastructures. It also provides several qualification principles defining the administrative framework needed for the practical implementation of the methodology, a description of the process of qualification of an inspection system, specifying its minimum technical and documentation related requirements, as well as specific requirements with regard to the NDT procedures, equipment and personnel to be qualified and the test specimen to be used in practical trials. Finally, the report suggests an appropriate distribution of responsibilities among all the parties involved in a qualification process, based on international practice

  6. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  7. Construction and Tests of the Mechanical Structure for a Semi-Digital Hadronic Calorimeter Prototype within the CALICE Collaboration

    International Nuclear Information System (INIS)

    Berenguer, J.

    2014-01-01

    The assembly of a mechanical structure used for a semi-digital hadronic calorimeter prototype, conceived and developed by the SDHCAL group within the CALICE collaboration, is presented in this note. CALICE is an international R and D collaboration dedicated to the development of calorimeters for future linear collider experiments. The design, assembly and quality control of this mechanical structure were entirely carried out at CIEMAT. This document contains a description of the prototype and its detectors, focusing on the design and assembly of the mechanical structure, which acts as well as the calorimeter absorber.. (Author)

  8. Aircraft impact qualification of RBMK systems and components. Technical report. Rev. 00, May 1999

    International Nuclear Information System (INIS)

    1999-01-01

    In the present report, the problem of qualification procedures of electrical equipment with respect to the dynamic excitation subsequent to an aircraft impact (ACC) on a Nuclear Power Plant (NPP) is approached, within the context of IAEA Benchmark on vulnerability of equipment and structures of RBMK-type NPP against the aircraft impact. After a short description of the main objectives of the work and the relevant area of concern (Chapter 1), the safety related equipment more commonly installed in a NPP are grouped in few classes, according to widely accepted classification criteria and the relevant failure modes are described (Chapter 2). Taking as reference a deeply studied RBMK reactor (Ignalina NPP), an overview of its main characteristics and of the equipment ensemble housed in is given in Chapter 3. An overview of the worldwide most used qualification standards for safety related equipment for NPPs is reported in Chapter 4, and a comparison of the practices used in Europe for the qualification of safety related electrical and I and C equipment is described with special attention to seismic and impact qualification (Chapter 5). In the hypothesis that the equipment to qualify against impact excitation has been already qualified against seismic excitation, the problems relevant to the different nature of earthquake and shock phenomena are listed, together with the main criteria to implement a procedure which, based on standardized shock pulses, could be applied for ACC qualification purposes (Chapter 6). Consequently, a possible ACC qualification procedure is outlined (Chapter 7) and the interface data (data coming from numerical analysis and seismic qualification, to be used for ACC qualification purposes) are listed (Chapter 8). Finally, the main conclusions of the work are described (Chapter 9). The main references are listed in Chapter 10. (author)

  9. Application of rapid prototyping technology in the prototype manufacturing for evaluation of NPP components and equipments

    International Nuclear Information System (INIS)

    Park, C. Y.; Kim, J. W.; Shon, H. K.; Choi, H. S.; Yang, D. Y.

    2001-01-01

    A brief overview of rapid prototyping technology in which a part with complex shape can be produced easily and rapidly in a layer-by-layer additive manner is given in this article. In addition, a prototype model of a complex fan is manufactured using three-dimensional solid CAD modeling and Laminated Object Manufacturing (LOM), a rapid prototyping technology. This enables designers to verify and modify design rapidly at an early stage of product development; and the prototype model of a fan can be used as a pattern for various secondary casting process such as vacumm casting, lost-paper casting to make prototypes of a fan. It has been shown that the combination of three-dimensional solid CAD modeling and rapid prototyping technology can reduce greatly the cost and time of prototyping of fans and turbine blades in comparison with conventional CNC machining. It should also be noted that rapid prototyping technology enables the visualization of various physical and chemical defects at a nuclear power plant so that it can help engineers understand those defects in an effective way

  10. Design requirements, criteria and methods for seismic qualification of CANDU power plants

    International Nuclear Information System (INIS)

    Singh, N.; Duff, C.G.

    1979-10-01

    This report describes the requirements and criteria for the seismic design and qualification of systems and equipment in CANDU nuclear power plants. Acceptable methods and techniques for seismic qualification of CANDU nuclear power plants to mitigate the effects or the consequences of earthquakes are also described. (auth)

  11. Qualification of organizations for independent technical supervision

    International Nuclear Information System (INIS)

    1981-04-01

    The requirements are established on trial for the qualification of an organization as an independent technical supervision organization in nuclear facilities, in activities related with quality assurance programs. (I.C.R.) [pt

  12. A prototype analysis of vengeance

    NARCIS (Netherlands)

    Elshout, Maartje; Nelissen, Rob; van Beest, Ilja

    2015-01-01

    The authors examined the concept of vengeance from a prototype perspective. In 6 studies, the prototype structure of vengeance was mapped. Sixty-nine features of vengeance were identified (Study 1), and rated on centrality (Study 2). Further studies confirmed the prototype structure. Compared to

  13. SpecSatisfiabilityTool: A tool for testing the satisfiability of specifications on XML documents

    Directory of Open Access Journals (Sweden)

    Javier Albors

    2015-01-01

    Full Text Available We present a prototype that implements a set of logical rules to prove the satisfiability for a class of specifications on XML documents. Specifications are given by means of constrains built on Boolean XPath patterns. The main goal of this tool is to test whether a given specification is satisfiable or not, and justify the decision showing the execution history. It can also be used to test whether a given document is a model of a given specification and, as a by-product, it permits to look for all the relations (monomorphisms between two patterns and to combine patterns in different ways. The results of these operations are visually shown and therefore the tool makes these operations more understandable. The implementation of the algorithm has been written in Prolog but the prototype has a Java interface for an easy and friendly use. In this paper we show how to use this interface in order to test all the desired properties.

  14. PR Faculty: What Are Their Qualifications?

    Science.gov (United States)

    Johnson, Thomas B.; Rabin, Kenneth

    1977-01-01

    Discusses a study designed to determine existing trends in the backgrounds and qualifications of public relations instructors and how these might affect public relations education. Available from: Public Relations Review, Ray Hiebert, Dean, College of Journalism, University of Maryland, College Park, MD 20742. (MH)

  15. Relationship Between Teachers\\' Qualification And Students ...

    African Journals Online (AJOL)

    It has been observed that students\\' performance in technical subjects is very poor. Coupled with this problem is that of lack of qualified technical teachers. This study determines the relationship between teachers\\' qualification and students\\' performance in technical subjects in selected schools in northern Nigeria.

  16. 42 CFR 485.705 - Personnel qualifications.

    Science.gov (United States)

    2010-10-01

    ... Physical Therapy and Speech-Language Pathology Services § 485.705 Personnel qualifications. (a) General... involved in the furnishing of outpatient physical therapy, occupational therapy, and speech-language...) of the Act and the requirements in part 484 of this chapter. (2) For a speech-language pathologist...

  17. Review on CNC-Rapid Prototyping

    International Nuclear Information System (INIS)

    M Nafis O Z; Nafrizuan M Y; Munira M A; Kartina J

    2012-01-01

    This article reviewed developments of Computerized Numerical Control (CNC) technology in rapid prototyping process. Rapid prototyping (RP) can be classified into three major groups; subtractive, additive and virtual. CNC rapid prototyping is grouped under the subtractive category which involves material removal from the workpiece that is larger than the final part. Richard Wysk established the use of CNC machines for rapid prototyping using sets of 2½-D tool paths from various orientations about a rotary axis to machine parts without refixturing. Since then, there are few developments on this process mainly aimed to optimized the operation and increase the process capabilities to stand equal with common additive type of RP. These developments include the integration between machining and deposition process (hybrid RP), adoption of RP to the conventional machine and optimization of the CNC rapid prototyping process based on controlled parameters. The article ended by concluding that the CNC rapid prototyping research area has a vast space for improvement as in the conventional machining processes. Further developments and findings will enhance the usage of this method and minimize the limitation of current approach in building a prototype.

  18. Model prototype of information support system for operator approaches and realization

    International Nuclear Information System (INIS)

    Samoilov, O.B.; Galushkin, V.A.; Drumov, V.V.; Kurachenkov, A.V.; Shashkin, S.L.; Mordvincev, V.M.

    1998-01-01

    In connection with the appearance in a structure of the national regulatory documentation on safety of the requirement about availability of information support systems, the works on development of such system are necessary for making a decision of a question on start-up each NPP. It was developed a model - prototype of the system for Voronezh AST (VAST). Main principles of this model are described in the present report. Besides, similar works on other types of NPPs are carried out. (author)

  19. Experience of secondary cooling system modification at prototype fast breeder reactor MONJU (Translated document)

    International Nuclear Information System (INIS)

    Kisohara, Naoyuki; Sakamoto, Yoshihiko

    2010-09-01

    The prototype fast breeder reactor MONJU has been shut down since the secondary sodium leak accident that occurred in December 1995. After the accident, an investigation into the cause and a comprehensive safety review of the plant were conducted, and various countermeasures for sodium leak were examined. Modification work commenced in September 2005. Since sodium, a chemically active material, is used as coolant in MONJU, the modification work required work methods suitable for the handling of sodium. From this perspective, the use of a plastic bag when opening the sodium boundary, oxygen concentration control in a plastic bag, slightly-positive pressure control of cover gas in the systems, pressing and cutting with a roller cutter to prevent the incorporation of metal fillings, etc. were adopted, with careful consideration given to experience and findings from previous modification work at the experimental fast reactor JOYO and plants abroad. Owing to these work methods, the modification work proceeded close to schedule without incident. (author)

  20. A strategy for implementation of experience based seismic equipment qualification in IEEE and ASME industry standards

    International Nuclear Information System (INIS)

    Adams, T.M.

    1996-01-01

    In the past 20 years, extensive data on the performance of mechanical and electric equipment during actual strong motion earthquakes and seismic qualification tests has been accumulated. Recognizing that an experience based approach provides a technically sound and cost effective method for the seismic qualification of some or certain equipment, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment established a Special Working Group to investigate the incorporation of experienced based methods into the industry consensus codes and standards currently used in the seismic qualification of Seismic Category Nuclear Power Plant equipment. This paper presents the strategy (course of action) which was developed by the Special Working Group for meeting this objective of incorporation of experience based seismic qualification standards used in the design and seismic qualification of seismic category nuclear power plant equipment. This strategy was recommended to both chartering organizations, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment for their consideration and implementation. The status of the review and implementation of the Special Working Group's recommended strategy by the sponsoring organization is also discussed