WorldWideScience

Sample records for prototype test results

  1. ALICE TRD results from prototype tests

    CERN Document Server

    Andronic, A; Blume, C; Braun-Munzinger, P; Bucher, D; Catanescu, G; Ciobanu, M; Daues, H W; Devismes, A; Finck, C; Herrmann, N; Lister, T A; Mahmoud, Tariq; Peitzmann, Thomas; Petrovici, M; Reygers, K; Santo, R; Schicker, R; Sedykha, S; Simon, R S; Stachel, J; Stelzer, H; Wessels, J P; Winkelmann, O; Windelband, B; Xu, C

    2002-01-01

    We present results from tests of a prototype of the TRD for the ALICE experiment at LHC. We investigate the performance-of different radiator types, composed of foils, fibres and foams. The pion rejection performance for different methods of analysis over a momentum range from 0.7 to 2 GeV/c is presented. (8 refs).

  2. Test Beam Results Obtained with the Q4 Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Aguilar-Benitez, M.; Alberdi, J.; Cerrada, M.; Colino, N.; Daniel, M.; Fouz, M. c.; Marin, J.; Mocholi, J.; Oller, J. C.; Puerta, J.; Romero, L.; Salicio, J. M.

    2000-07-01

    A prototype of the CMS Barrel Muon Detector incorporating all the features of the final chambers was built at CIEMAT using the mass production assembly procedures and tools. The performance of this prototype was studied in a muon test beam at CERN and the results obtained are presented here. (Author)

  3. Test beam results obtained with the Q4 prototype

    International Nuclear Information System (INIS)

    Aguilar-Benitez, M.; Alberdi, J.; Cerrada, M.; Colino, N.; Daniel, M.; Fouz, M.C.; Marin, J.; Mocholi, J.; Oller, J. C.; Puerta, J.; Romero, L.; Salicio, J. M.; Willmott, C.

    2000-10-01

    A prototype of the CMS Barrel Muon Detector incorporating all the features of the final chambers was built at CIEMAT using the mass production assembly procedures and tools. The performance of this prototype was studied in a muon test beam at CERN and the results obtained are presented here. (Author)

  4. Sims Prototype System 2 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The testing, problems encountered, and the results and conclusions obtained from tests performed on the IBM Prototype System, 2, solar hot water system, at the Marshall Space Flight Center Solar Test Facility was described. System 2 is a liquid, non draining solar energy system for supplying domestic hot water to single residences. The system consists of collectors, storage tank, heat exchanger, pumps and associated plumbing and controls.

  5. SIMS prototype System 3 test results: engineering analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  6. SIMS prototype system 3 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The results obtained during testing of a closed hydronic drain down solar system designed for space and hot water heating is presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 3 for field installation.

  7. Multi-bundle shashlik calorimeter prototypes beam-test results

    International Nuclear Information System (INIS)

    Badier, J.; Bloch, P.; Bityukov, S.; Bordalo, P.; Busson, P.; Charlot, C.; Dobrzynski, L.; Golutvin, I.; Guschin, E.; Issakov, V.; Ivanchenko, I.; Klimenko, V.; Marin, V.; Moissenz, P.; Obraztsov, V.; Ostankov, A.; Popov, V.; Puljak, I.; Ramos, S.; Seez, C.; Sergueev, S.; Soushkov, V.; Tanaka, R.; Varela, J.; Virdee, T.S.; Zaitchenko, A.; Zamiatin, N.

    1995-01-01

    The first beam-test results for two- and three-bundle shashlik tower prototypes are described. We found that the spatial resolution, the uniformity of energy response, the calorimeter reliability and hermeticity and also two showers separation are improved in multi-bundle design approach. ((orig.))

  8. SIMS prototype system 1 test results: Engineering analysis

    Science.gov (United States)

    1978-01-01

    The space and domestic water solar heating system designated SIMS Prototype Systems 1 was evaluated. The test system used 720 ft (gross) of Solar Energy Products Air Collectors, a Solar Control Corporation SAM 20 Air Handler with Model 75-175 control unit, a Jackson Solar Storage tank with Rho Sigma Mod 106 controller, and 20 tons of rack storage. The test data analysis performed evaluates the system performance and documents the suitability of SIMS Prototype System 1 hardware for field installation.

  9. Test beam results of Silicon Drift Detector prototypes for the ALICE experiment

    Energy Technology Data Exchange (ETDEWEB)

    Nouais, D.; Bonvicini, V.; Busso, L.; Cerello, P.; Giubellino, P.; Gregorio, A.; Hernandez-Montoya, R.; Idzik, M.; Kolojvari, A.; Mazza, G.; Montano, L. M.; Nilsen, B.S.; Petta, C.; Randazzo, N.; Rashevsky, A.; Reito, S.; Rivetti, A.; Tosello, F.; Trzaska, W.H.; Vacchi, A

    1999-08-01

    We report preliminary beam test results of linear Silicon Drift Detector prototypes for the ALICE experiment. Linearity, resolution, charge transport and collection, and efficiency have been studied using a minimum ionizing particle beam for a very large area detector prototype read out with the OLA preamplifier/shaper and for another detector read out using a new transimpedance amplifier with a non linear response.

  10. Test-beam results of a SOI pixel detector prototype

    CERN Document Server

    Bugiel, Roma; Dannheim, Dominik; Fiergolski, Adrian; Hynds, Daniel; Idzik, Marek; Kapusta, P; Kucewicz, Wojciech; Munker, Ruth Magdalena; Nurnberg, Andreas Matthias

    2018-01-01

    This paper presents the test-beam results of a monolithic pixel-detector prototype fabricated in 200 nm Silicon-On-Insulator (SOI) CMOS technology. The SOI detector was tested at the CERN SPS H6 beam line. The detector is fabricated on a 500 μm thick high-resistivity float- zone n-type (FZ-n) wafer. The pixel size is 30 μm × 30 μm and its readout uses a source- follower configuration. The test-beam data are analysed in order to compute the spatial resolution and detector efficiency. The analysis chain includes pedestal and noise calculation, cluster reconstruction, as well as alignment and η-correction for non-linear charge sharing. The results show a spatial resolution of about 4.3 μm.

  11. Test beam results of silicon drift detector prototypes for the ALICE experiment

    CERN Document Server

    Nouais, D; Busso, L; Cerello, P G; Giubellino, P; Gregorio, A; Hernández-Montoya, R; Idzik, M; Kolojvari, A A; Mazza, G; Montaño-Zetina, L M; Nilsson, B S; Petta, C; Randazzo, N; Rashevsky, A; Reito, S; Rivetti, A; Tosello, F; Trzaska, W H; Vacchi, A

    1999-01-01

    We report preliminary beam test results of linear silicon drift detector prototypes for the ALICE experiment. Linearity, resolution, charge transport and collection, and efficiency have been studied using a minimum ionizing particle beam for a very large area detector prototype read out with the OLA preamplifier/shaper and for another detector read out using a new transimpedance amplifier with a nonlinear response. (14 refs).

  12. Test results on prototype 50-kA conductors for tokamak induction heating coils

    International Nuclear Information System (INIS)

    Wollan, J.J.; Williamson, K.D. Jr.; Turck, B.

    1979-01-01

    Fabricability of a very large, 50-kA superconducting cable has been demonstrated. Test results of critical current and stability measurements are presented. The design critical current of 55 kA at 7 T was met. The recovery current was degraded as a result of the expectedly poor insulation system. Energy loss measurements on prototype advanced mixed matrix conductors, which will be incorporated into a second prototype cable, are presented

  13. Results of Ageing Tests on the Forward MSGC 'BANANA' Prototype

    CERN Document Server

    Boimska, B; Capéans-Garrido, M; Claes, S; Hoch, Michael; Million, Gilbert; Ropelewski, Leszek; Sharma, Abhishek; Shekhtman, L I; Van Doninck, Walter; Van Lancker, Luc

    1996-01-01

    The forward tracker of the CMS experiment at CERN will consist of a large number of MicroStrip Gas Chambers ( MSGCs), expected to operate for several years in the high luminosity environment of LHC with an accumulated dose rate of ~ 10 mC/yr per cm of strip. They are planned to be arranged around the interaction point in modular wheels which contain several MSGCs. The 'open'option of a forward CMS 'banana' module includes the electronics inside the gas volume. Long term tests of one such prototype containing two plates, one with gold and the other with chromium strips on diamond-like coated D263 glass with representative electronics and surface mount components inside the gas volume have been performed; the satisfactory results are reported here. A first test has been made with a gas flow rate of 60 cc/min in the prototype ( corresponding to 5 gas renewals per hour) and has shown no gain drop up to 85 mC/cm of accumulated charge per strip. A second test has been performed with a gas flow rate of 6 cc/min corr...

  14. Full length prototype SSC dipole test results

    International Nuclear Information System (INIS)

    Strait, J.; Brown, B.C.; Carson, J.

    1987-01-01

    Results are presented from tests of the first full length prototype SSC dipole magnet. The cryogenic behavior of the magnet during a slow cooldown to 4.5K and a slow warmup to room temperature has been measured. Magnetic field quality was measured at currents up to 2000 A. Averaged over the body field all harmonics with the exception of b 2 and b 8 are at or within the tolerances specified by the SSC Central Design Group. (The values of b 2 and b 8 result from known design and construction defects which will be be corrected in later magnets.) Using an NMR probe the average body field strength is measured to be 10.283 G/A with point to point variations on the order of one part in 1000. Data are presented on quench behavior of the magnet up to 3500 A (approximately 55% of full field) including longitudinal and transverse velocities for the first 250 msec of the quench

  15. 16 CFR 1633.4 - Prototype testing requirements.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Prototype testing requirements. 1633.4... STANDARD FOR THE FLAMMABILITY (OPEN FLAME) OF MATTRESS SETS The Standard § 1633.4 Prototype testing... three specimens of each prototype to be tested according to § 1633.7 and obtain passing test results...

  16. Design and Beam Test Results for the sPHENIX Electromagnetic and Hadronic Calorimeter Prototypes

    Energy Technology Data Exchange (ETDEWEB)

    Aidala, C.A.; et al.

    2017-04-05

    The sPHENIX experiment at the Relativistic Heavy Ion Collider (RHIC) will perform high precision measurements of jets and heavy flavor observables for a wide selection of nuclear collision systems, elucidating the microscopic nature of strongly interacting matter ranging from nucleons to the strongly coupled quark-gluon plasma. A prototype of the sPHENIX calorimeter system was tested at the Fermilab Test Beam Facility as experiment T-1044 in the spring of 2016. The electromagnetic calorimeter (EMCal) prototype is composed of scintillating fibers embedded in a mixture of tungsten powder and epoxy. The hadronic calorimeter (HCal) prototype is composed of tilted steel plates alternating with plastic scintillator. Results of the test beam reveal the energy resolution for electrons in the EMCal is $2.8\\%\\oplus~15.5\\%/\\sqrt{E}$ and the energy resolution for hadrons in the combined EMCal plus HCal system is $13.5\\%\\oplus 64.9\\%/\\sqrt{E}$. These results demonstrate that the performance of the proposed calorimeter system is consistent with \\geant simulations and satisfies the sPHENIX specifications.

  17. Test case preparation using a prototype

    OpenAIRE

    Treharne, Helen; Draper, J.; Schneider, Steve A.

    1998-01-01

    This paper reports on the preparation of test cases using a prototype within the context of a formal development. It describes an approach to building a prototype using an example. It discusses how a prototype contributes to the testing activity as part of a lifecycle based on the use of formal methods. The results of applying the approach to an embedded avionics case study are also presented.

  18. Test results for three prototype models of a linear induction launcher

    International Nuclear Information System (INIS)

    Zabar, Z.; Lu, X.N.; He, J.L.; Birenbaum, L.; Levi, E.; Kuznetsov, S.B.; Nahemow, M.D.

    1991-01-01

    This paper reports on the work on the linear induction launcher (LIL) started with an analytical study tht was followed by computer simulations and then was tested by laboratory models. Two mathematical representations have been developed to describe the launcher. The first, based on the field approach with sinusoidal excitation, has been validated by static tests on a small scale prototype fed at constant current and variable frequency. The second, a transient representation using computer simulation allows consideration of energization by means of a capacitor bank and a power conditioner. Tests performed on three small-scale prototypes up to 100 m/s muzzle velocities show good agreement with predicted performance

  19. Test beam results of LHCb scintillating fibre tracker prototypes

    Energy Technology Data Exchange (ETDEWEB)

    Bachmann, Sebastian; Comerma, Albert; Gerick, David; Hansmann-Menzemer, Stephanie; Kecke, Matthieu; Leverington, Blake; Mazorra de Cos, Jose; Mitzel, Dominik; Neuner, Max; Uwer, Ulrich; Han, Xiaoxue [Physikalisches Institut, Universitaet Heidelberg (Germany); Collaboration: LHCb-Collaboration

    2016-07-01

    During the Long Shutdown 2 of the LHC, the LHCb detector will undergo a major upgrade to meet the challenges of running at a higher luminosity. The current Inner and Outer Tracking system will not be sufficient to deal with the envisaged increased detector occupancy and higher radiation levels and will be replaced by a single tracking detector based on 0.250 mm diameter plastic scintillating fibres. The fibres are wound to multilayer ribbons 2.4 m long and read out by 128 channel silicon photomultiplier arrays. The Scintillating Fibre (SciFi) tracker will cover a total active area of 360 m{sup 2}, arranged in 12 layers. The performances of prototype modules having 6 and 8 layers of fibre have been tested at the SPS at CERN. This talk focuses on basic properties of the prototype modules such as spatial resolution, single hit efficiency and light yield measured during the test beam campaigns in 2015.

  20. A prototype tap test imaging system: Initial field test results

    Science.gov (United States)

    Peters, J. J.; Barnard, D. J.; Hudelson, N. A.; Simpson, T. S.; Hsu, D. K.

    2000-05-01

    This paper describes a simple, field-worthy tap test imaging system that gives quantitative information about the size, shape, and severity of defects and damages. The system consists of an accelerometer, electronic circuits for conditioning the signal and measuring the impact duration, a laptop PC and data acquisition and processing software. The images are generated manually by tapping on a grid printed on a plastic sheet laid over the part's surface. A mechanized scanner is currently under development. The prototype has produced images for a variety of aircraft composite and metal honeycomb structures containing flaws, damages, and repairs. Images of the local contact stiffness, deduced from the impact duration using a spring model, revealed quantitatively the stiffness reduction due to flaws and damages, as well as the stiffness enhancement due to substructures. The system has been field tested on commercial and military aircraft as well as rotor blades and engine decks on helicopters. Field test results will be shown and the operation of the system will be demonstrated.—This material is based upon work supported by the Federal Aviation Administration under Contract #DTFA03-98-D-00008, Delivery Order No. IA016 and performed at Iowa State University's Center for NDE as part of the Center for Aviation Systems Reliability program.

  1. The Mark III vertex chamber and prototype test results

    International Nuclear Information System (INIS)

    Grab, C.

    1987-07-01

    A vertex chamber has been constructed for use in the Mark III experiment. The chamber is positioned inside the current main drift chamber and will be used to trigger data collection, to aid in vertex reconstruction, and to improve the momentum resolution. This paper discusses the chamber's construction and performance and tests of the prototype

  2. Test beam results of a depleted monolithic active pixel sensor (DMAPS) prototype

    Energy Technology Data Exchange (ETDEWEB)

    Obermann, Theresa; Hemperek, Tomasz; Huegging, Fabian; Krueger, Hans; Wermes, Norbert [Bonn Univ. (Germany); Schwenker, Benjamin [Goettingen Univ. (Germany); Collaboration: ATLAS Pixel-Collaboration

    2016-07-01

    New monolithic detector concepts are currently being explored for future particle physics experiments, in particular for the upgrade of the ATLAS detector. Common to monolithic pixel detectors is the integration of the front-end circuitry and the sensor on the same silicon substrate. The DMAPS concept makes use of high resistive silicon as substrate. It enables the application of a high bias voltage to create a drift field for the charge collection in the sensor part as well as the full usage of CMOS logic in the same piece of silicon. DMAPS prototypes from several foundries are available since three years and have been extensively characterized in the lab. In this talk, results of test beam campaigns, with neutron irradiated prototypes implemented in the ESPROS process, are presented.

  3. Designing and testing prototypes

    NARCIS (Netherlands)

    Vereijken, P.; Wijnands, F.; Stol, W.

    1995-01-01

    This second progress report focuses on designing a theoretical prototype by linking parameters to methods and designing the methods in this context until they are ready for initial testing. The report focuses also on testing and improving the prototype in general and the methods in particular until

  4. Assessment of the tests results of the two CERN-INFN 10 m long superconducting dipole prototypes for the LHC

    International Nuclear Information System (INIS)

    Bona, M.; Perin, R.; Acerbi, E.; Rossi, L.

    1996-01-01

    In the first phase of the R and D program for LHC dipoles, seven 10-m-long, 50-mm-aperture prototypes have been manufactured by European Industries. The first two prototypes, fabricated under a CERN-INFN Collaboration, were successfully tested in 1994. This paper provides a first assessment of the main test results of these two magnets, in particular for what concerns kinematics and evolution of the stress distribution in the magnet during cooldown, energization and warmup. The influence of some adopted technological solutions is also discussed. Based on test results, some design corrections are proposed for adoption in the design of the future 15-m-long LHC dipole prototype

  5. Yucca Mountain project prototype testing

    International Nuclear Information System (INIS)

    Hughes, W.T.; Girdley, W.A.

    1990-01-01

    The U.S. DOE is responsible for characterizing the Yucca Mountain site in Nevada to determine its suitability for development as a geologic repository to isolate high-level nuclear waste for at least 10,000 years. This unprecedented task relies in part on measurements made with relatively new methods or applications, such as dry coring and overcoring for studies to be conducted from the land surface and in an underground facility. The Yucca Mountain Project has, since 1988, implemented a program of equipment development and methods development for a broad spectrum of hydrologic, geologic, rock mechanics, and thermomechanical tests planned for use in an Exploratory Shaft during site characterization at the Yucca Mountain site. A second major program was fielded beginning in April 1989 to develop and test methods and equipment for surface drilling to obtain core samples from depth using only air as a circulating medium. The third major area of prototype testing has been during the ongoing development of the Instrumentation/ Data Acquisition System (IDAS), designed to collect and monitor data from down-hole instrumentation in the unsaturated zone, and store and transmit the data to a central archiving computer. Future prototype work is planned for several programs including the application of vertical seismic profiling methods and flume design to characterizing the geology at Yucca Mountain. The major objectives of this prototype testing are to assure that planned Site Characterization testing can be carried out effectively at Yucca Mountain, both in the Exploratory Shaft Facility (ESF), and from the surface, and to avoid potential major failures or delays that could result from the need to re-design testing concepts or equipment. This paper will describe the scope of the Yucca Mountain Project prototype testing programs and summarize results to date. 3 figs

  6. Results and analysis of high heat flux tests on a full-scale vertical target prototype of ITER divertor

    International Nuclear Information System (INIS)

    Missirlian, M.; Escourbiac, F.; Merola, M.; Bobin-Vastra, I.; Schlosser, J.; Durocher, A.

    2005-01-01

    After an extensive R and D development program, a full-scale divertor target prototype, manufactured with all the main features of the corresponding ITER divertor, was intensively tested in the high heat flux FE200 facility. The prototype consists of four units having a full monoblock geometry. The lower part (CFC armour) and the upper part (W armour) of each monoblock were joined to the solution annealed, quenched and cold worked CuCrZr tube by HIP technique. This paper summarises and analyses the main test results obtained on this prototype

  7. Status report on ESF-related prototype testing

    International Nuclear Information System (INIS)

    Oliver, R.D.; Kalia, H.N.

    1992-12-01

    This report provides information on the Prototype Testing performed in the G-Tunnel on the Nevada Test Site by the Yucca Mountain Project form April 1988 to November 1989. The Testing Program was implemented to ensure that the Exploratory Shaft Facility (ESF) tests can be completed in the time available and to develop instruments, equipment, and procedures so the ESF tests can collect reliable and representative site characterization data. This report summarizes the ESF prototype tests and presents preliminary results

  8. The comparative analysis of model and prototype test results of Bulb turbine

    International Nuclear Information System (INIS)

    Benisek, M; Bozic, I; Ignjatovic, B

    2010-01-01

    This paper presents the problem of the hydropower plant oblique water inflow and its influence on the turbines operation. Oblique water inflow on the low head hydropower plant with bulb turbines influences turbine characteristics. The characteristics change occurs due to swirl incidence in the turbine inlet which spreads to the guide vanes inlet. Downstream, the flow conditions change is caused in the turbine runner in relation to the flow conditions without swirl inflow. Special attention is paid to the phenomenon of swirl flow incidence in the turbine conduit. With the aim of presenting and analyzing the oblique water inflow consequences on the hydropower plant operation, the existing turbine model tests results, performed in the laboratories, and the in situ prototype testing results have been used.

  9. Low-energy beam test results of a calorimeter prototype for the CREAM experiment

    CERN Document Server

    Bagliesi, M G; Ganel, O; Kim, K C; Lee, M H; Lomtadze, T A; Lutz, L; Maestro, P; Marrocchesi, P S; Meucci, M; Millucci, V; Morsani, F; Seo, E S; Valle, G D

    2003-01-01

    CREAM (Cosmic Ray Energetics and Mass) is an experiment under construction for a direct measurement of high energy cosmic rays (10 /sup 12/ to >5.10/sup 14/ eV) over the elemental range from proton to iron. The first flight of CREAM is intended to demonstrate the new ultra long duration balloon (ULDB) capability under development by NASA. A prototype of a tungsten-SciFi imaging calorimeter designed for CREAM has been tested at CERN with electron beam energies ranging from 5 to 100 GeV. Although the calorimeter module is optimized for cosmic-ray spectral measurements in the multiTeV region, the response of its electromagnetic section to low energy electrons has been studied with this dedicated prototype. Results show good agreement with the expected behaviour in terms of linearity and energy resolution.

  10. Results from the FDIRC prototype

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, D.A., E-mail: roberts@umd.edu [University of Maryland, College Park, MD 20742 (United States); Arnaud, N. [Laboratoire de l’Accélérateur Linéaire, Centre Scientifique d’Orsay, F-91898 Orsay Cedex (France); Dey, B. [University of California, Riverside, CA 92521 (United States); Borsato, M. [Laboratoire de l’Accélérateur Linéaire, Centre Scientifique d’Orsay, F-91898 Orsay Cedex (France); Leith, D.W.G.S.; Nishimura, K.; Ratcliff, B.N. [SLAC, Stanford University, Palo Alto, CA 94309 (United States); Varner, G. [University of Hawaii, Honolulu, HI 96822 (United States); Va’vra, J. [SLAC, Stanford University, Palo Alto, CA 94309 (United States)

    2014-12-01

    We present results from a novel Cherenkov imaging detector called the Focusing DIRC (FDIRC). This detector was designed as a prototype of the particle identification system for the SuperB experiment, and comprises 1/12 of the SuperB barrel azimuthal coverage with partial electronics implementation. The prototype was tested in the SLAC Cosmic Ray Telescope (CRT) which provides 3-D muon tracking with an angular resolution of ∼1.5 mrad, track position resolution of 5–6 mm, start time resolution of 70 ps, and a muon low-energy cutoff of ∼2 GeV provided by an iron range stack. The quartz focusing photon camera couples to a full-size BaBar DIRC bar box and is read out by 12 Hamamatsu H8500 MaPMTs providing 768 pixels. We used IRS2 waveform digitizing electronics to read out the MaPMTs. We present several results from our on-going development activities that demonstrate that the new optics design works very well, including: (a) single photon Cherenkov angle resolutions with and without chromatic corrections, (b) S/N ratio between the Cherenkov peak and background, which consists primarily of ambiguities in possible photon paths to a given pixel, (c) dTOP=TOP{sub measured}–TOP{sub expected} resolutions, and (d) performance of the detector in the presence of high-rate backgrounds. We also describe data analysis methods and point out limits of the present performance. - Highlights: • We present results from a novel Cherenkov imaging detector called the Focusing DIRC (FDIRC). • The prototype was tested in the SLAC Cosmic Ray Telescope (CRT) which provides 3-D muon tracking. • We present several results from our on-going development activities that demonstrate that new optics design works very well. • We describe data analysis methods and point out limits of the present performance.

  11. 46 CFR 161.013-11 - Prototype test.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Prototype test. 161.013-11 Section 161.013-11 Shipping...: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Electric Distress Light for Boats § 161.013-11 Prototype test. (a) Each manufacturer must test a prototype light identical to the lights to be certified prior to...

  12. The Yucca Mountain Project Prototype Testing Program

    International Nuclear Information System (INIS)

    1989-10-01

    The Yucca Mountain Project is conducting a Prototype Testing Program to ensure that the Exploratory Shaft Facility (ESF) tests can be completed in the time available and to develop instruments, equipment, and procedures so the ESF tests can collect reliable and representative site characterization data. This report summarizes the prototype tests and their status and location and emphasizes prototype ESF and surface tests, which are required in the early stages of the ESF site characterization tests. 14 figs

  13. Test Results of the Third LHC Main Quadrupole Magnet Prototype at CEA/Saclay

    CERN Document Server

    Derégel, J; Gourdin, C; Hervieu, M; Ogitsu, T; Peyrot, M; Rifflet, J M; Schild, T; Simon, F; Tortschanoff, Theodor; Tsuchiya, K

    2002-01-01

    The construction of the third second-generation main quadrupole magnet prototype for LHC has been completed at CEA/Saclay in November 2000. The magnet was tested at 1.9 K. Similarly to the two first ones, this prototype has exceeded the operating current in one training step and exhibited excellent training memory after a thermal cycle. This paper describes the quench performance and quench start localization determined by means of voltage-taps and a quench antenna system developed in collaboration with KEK. As this magnet was equipped with capacitive gauges, the stresses during cool-down and powering have been recorded and are in agreement with FE computations. The newly designed quench heaters have improved efficiency and reproducibility compared to those of the first generation. Magnetic measurements have been performed at various stages. The cold measurements show minor differences with those at room temperature and are similar to those of the two first magnets of this design. These results prove that the...

  14. Testing of Prototype Magnetic Suspension Cryogenic Transfer Line

    Science.gov (United States)

    Fesmire, J. E.; Augustynowicz, S. D.; Nagy, Z. F.; Sojourner, S. J.; Shu, Q. S.; Cheng, G.; Susta, J. T.

    2006-04-01

    A 6-meter prototype cryogenic transfer line with magnetic suspension was tested for its mechanical and thermal performance at the Cryogenics Test Laboratory of NASA Kennedy Space Center (KSC). A test facility with two cryogenic end-boxes was designed and commissioned for the testing. Suspension mechanisms were verified through a series of tests with liquid nitrogen. The thermal performance of the prototype was determined using the new test apparatus. The tested prototype has incorporated temperature and vacuum pressure data acquisition ports, customized interfaces to cryogenic end-boxes, and instrumentation. All tests were conducted under simulated onsite transfer line working conditions. A static (boiloff rate measurement) testing method was employed to demonstrate the gross heat leak in the tested article. The real-time temperature distribution, vacuum level, levitation distance, and mass flow rate were measured. The main purpose of this paper is to summarize the testing facility design and preparation, test procedure, and primary test results. Special arrangements (such as turning on/off mechanical support units, observing levitation gap, and setting up the flowmeter) in testing of such a magnetically levitated transfer line are also discussed. Preliminary results show that the heat leak reduction of approximately one-third to one-half is achievable through such transfer lines with a magnetic suspension system.

  15. Test-beam Results from a RICH Detector Prototype Using Aerogel Radiator and Pixel Hybrid Photon Detectors

    CERN Document Server

    Aglieri-Rinella, G; Van Lysebetten, A; Piedigrossi, D; Wyllie, K; Bellunato, T F; Calvi, M; Matteuzzi, C; Musy, M; Perego, D L; Somerville, L P; Newby, C; Easo, S; Wotton, S

    2006-01-01

    A test-beam study was performed at CERN with a Ring Imaging Cherenkov (RICH) prototype using three pixel Hybrid Photon Detectors. Results on the photon yield and Cherenkov angle resolution are presented here, for the Aerogel radiator and also for reference runs taken with Nitrogen radiator.

  16. Prototype Engineered Barrier System Field Tests

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Beatty, J.; Buscheck, T.A.

    1989-01-01

    This paper presents selected preliminary results obtained during the first 54 days of the Prototype Engineered Barrier System Field Tests (PEBSFT) that are being performed in G-Tunnel within the Nevada Test Site. The test described is a precursor to the Engineered Barrier Systems Field Tests (EBSFT). The EBSFT will consist of in situ tests of the geohydrologic and geochemical environment in the near field (within a few meters) of heaters emplaced in welded tuff to simulate the thermal effects of waste packages. The PEBSFTs are being conducted to evaluate the applicability of measurement techniques, numerical models, and procedures for future investigations that will be conducted in the Exploratory Shaft Facilities of the Yucca Mountain Project (YMP). The paper discusses the evolution of hydrothermal behavior during the prototype test, including rock temperatures, changes in rock moisture content, air permeability of fractures, gas pressures, and rock mass gas-phase humidity. 10 refs., 12 figs

  17. Analysis results of the April 1996 combined test of the LArgon and TILECAL barrel calorimeter prototypes

    CERN Document Server

    Cobal, M; Costanzo, D; David, M; Davidek, T; Efthymiopoulos, I; Khubua, J I; Kulchitskii, Yu A; Kuzmin, M V; Lund-Jensen, B; Leitner, R; Mazzoni, E; Mosidze, M; Némécek, S; Nessi, Marzio; Pantea, D; Sala, P; Solodkov, A; Stanek, B; Vichou, I

    1998-01-01

    In April 1996 a second combined electromagnetic and hadronic ATLAS calorimeter prototype test beam was performed. The response to pions and electrons of various energies (10, 20, 40, 50, 80, 100, 150 and 300~GeV) at an incident $\\theta$ angle of $12^0$ was investigated. The energy released by pions in the prototype was reconstructed using a minimal set of corrections introduced to take into account various detector effects ("benchmark" approach). A weighting method 'a la H1' was applied too. Energy resolution, $e$/$\\pi$ and linearity were calculated. Finally, the transverse and longitudinal pion shower developments were examined as well as the longitudinal leakage. The signal released by muons was analyzed. The noise was evaluated for both the detectors. The results were compared with those obtained in the previous combined test beam, performed in September 1994.

  18. Prototype Repository. Tracer dilution tests during operation phase, test campaign 3

    Energy Technology Data Exchange (ETDEWEB)

    Harrstroem, Johan; Andersson, Peter (Geosigma AB (Sweden))

    2010-05-15

    The Prototype Repository project is focused on testing and demonstrating the function of the SKB deep repository system. The third tracer dilution campaign during the Prototype Repository operation period was performed in January 2010. The purpose was to estimate the groundwater flows and hydraulic gradients in the boreholes vicinity and will function as a reference for comparison with results from modeling and prior assumptions. The test campaign consisted of tracer dilution tests in 13 different borehole sections. Each test consisted of approximately 15-55 min tracer injection time and about 1-3 days dilution test time depending on the transmissivity of the test section. The data interpretation also included estimates of the local hydraulic gradients in the vicinity of the borehole sections

  19. MP98, an innovative reactivity control system for LWR and VHTR, tests results on prototypes

    International Nuclear Information System (INIS)

    Emin, M.; Gagne, J.F.

    2005-01-01

    MP98' Reactivity Control System is now a technology tested on a real scale prototypes. Demonstrator is working at PWR real conditions (155 bars, 320 degree C), and many accidents configurations could be simulated. This paper presents the technology, describes the demonstrator design and presents some results. Mock up and demonstrator have permitted to optimize the design of MP98' devices to prepare industrialization. (authors)

  20. Z-1 Prototype Space Suit Testing Summary

    Science.gov (United States)

    Ross, Amy

    2013-01-01

    The Advanced Space Suit team of the NASA-Johnson Space Center performed a series of test with the Z-1 prototype space suit in 2012. This paper discusses, at a summary level, the tests performed and results from those tests. The purpose of the tests were two-fold: 1) characterize the suit performance so that the data could be used in the downselection of components for the Z-2 Space Suit and 2) develop interfaces with the suitport and exploration vehicles through pressurized suit evaluations. Tests performed included isolated and functional range of motion data capture, Z-1 waist and hip testing, joint torque testing, CO2 washout testing, fit checks and subject familiarizations, an exploration vehicle aft deck and suitport controls interface evaluation, delta pressure suitport tests including pressurized suit don and doff, and gross mobility and suitport ingress and egress demonstrations in reduced gravity. Lessons learned specific to the Z-1 prototype and to suit testing techniques will be presented.

  1. Beam test results of the first full-scale prototype of CMS RE 1/2 resistive plate chamber

    International Nuclear Information System (INIS)

    Ying Jun; Ban Yong; Ye Yanlin; Cai Jianxin; Qian Sijin; Wang Quanjin; Liu Hongtao

    2005-01-01

    The authors reported the muon beam test results of the first full-scale prototype of CMS RE 1/2 Resistive Plate Chamber (RPC). The bakelite surface is treated using a special technology without oil to make it smooth enough. The full scale RE 1/2 RPC with honeycomb supporting frame is strong and thin enough to be fitted to the limited space of CMS design for the inner Forward RPC. The muon beam test was performed at CERN Gamma Irradiation Facility (GIF). The detection efficiency of this full scale RPC prototype is >95% even at very high irradiation background. The time resolution (less than 1.2 ns) and spatial resolution are satisfactory for the muon trigger device in future CMS experiments. The noise rate is also calculated and discussed

  2. 46 CFR 154.560 - Cargo hose: Prototype test.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo hose: Prototype test. 154.560 Section 154.560... Hose § 154.560 Cargo hose: Prototype test. (a) Each cargo hose must be of a type that passes a prototype test at a pressure of at least five times its maximum working pressure at or below the minimum...

  3. Status and first Results of the CBM TRD Prototype Development

    International Nuclear Information System (INIS)

    Arend, Andreas

    2013-01-01

    The measurement of decay products from rare particles in the CBM experiment defines the requirements for the used detector systems. This report describes the approaches for the Transition Radiation Detector to fulfil these requirements and presents the current status of the prototype development. First results from beam tests with these prototypes are discussed.

  4. Prototype HL-LHC magnet undergoes testing

    CERN Multimedia

    Corinne Pralavorio

    2016-01-01

    A preliminary short prototype of the quadrupole magnets for the High-Luminosity LHC has passed its first tests.   The first short prototype of the quadrupole magnet for the High Luminosity LHC. (Photo: G. Ambrosio (US-LARP and Fermilab), P. Ferracin and E. Todesco (CERN TE-MSC)) Momentum is gathering behind the High-Luminosity LHC (HL-LHC) project. In laboratories on either side of the Atlantic, a host of tests are being carried out on the various magnet models. In mid-March, a short prototype of the quadrupole magnet underwent its first testing phase at the Fermilab laboratory in the United States. This magnet is a pre-prototype of the quadrupole magnets that will be installed near to the ATLAS and CMS detectors to squeeze the beams before collisions. Six quadrupole magnets will be installed on each side of each experiment, giving a total of 24 magnets, and will replace the LHC's triplet magnets. Made of superconducting niobium-tin, the magnets will be more powerful than their p...

  5. 16 CFR 1633.5 - Prototype pooling and confirmation testing requirements.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Prototype pooling and confirmation testing... Prototype pooling and confirmation testing requirements. (a) Prototype pooling. One or more manufacturers may rely on a qualified prototype produced by another manufacturer or prototype developer provided...

  6. Advanced Prototype Fan Operating Experience, Post Test Evaluation, and Refurbishment for PLSS 2.0 Test Use

    Science.gov (United States)

    Hodgson, Edward; Oehler, William; Dionne, Steve; Converse, David; Jennings, Mallory A.

    2012-01-01

    NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.

  7. Specification and tests of three prototypes from tissue-equivalent ionization chamber

    International Nuclear Information System (INIS)

    Teixeira, D.L.; Cardoso, D.O.; Pereira, O.S.; Nobre Filho, L.S.; Cabral, T.S.

    1992-01-01

    Three prototypes of tissue-equivalent ionization chamber are specified and tested. The results obtained by these prototypes are presented, aiming the determination of operation parameters, defined by IEC 395 standard. (C.G.C.)

  8. Eight plane IPND [Integration Prototype Near Detector] mechanical testing

    International Nuclear Information System (INIS)

    Zhao, A.; Guarino, V.; Wood, K.; Nephew, T.; Ayres, D.

    2008-01-01

    A mechanical test of an 8 plane IPND mechanical prototype, which was constructed using extrusions from the testing/tryout of the 16 cell prototype extrusion die in Argonne National Laboratory, was conducted. There were 4 vertical and 4 horizontal planes in this 8 plane IPND prototype. Each vertical plane had four 16 cell extrusions, while each horizontal plane had six 16 cell extrusions. Each plane was glued together using the formulation of Devcon adhesive, Devcon 60. The vertical extrusions used in the vertical planes shares the same dimensions as the horizontal extrusions in the horizontal planes with the average web thickness of 2.1 mm and the average wall thickness of 3.1 mm. This mechanical prototype was constructed with end-seals on the both ends of the vertical extrusions. The gaps were filled with epoxy between extrusions and end-seals. The overall dimension of IPND is 154.8 by 103.1 by 21.7 inches with the weight of approximately 1200 kg, as shown in a figure. Two similar mechanical tests of 3 layer and 11 layer prototypes have been done in order to evaluate the strength of the adhesive joint between extrusions in the NOvA detector. The test showed that the IPND prototype was able to sustain under the loading of weight of itself and scintillator. Two FEA models were built to verify the measurement data from the test. The prediction from FEA slice model seems correlated reasonably well to the test result, even under a 'rough' estimated condition for the wall thickness (from an untuned die) and an unknown property of 'garage type' extrusion. A full size of FEA 3-D model also agrees very well with the test data from strain gage readings. It is worthy to point out that the stress distribution of the structure is predominantly determined by the internal pressure, while the buckling stability relies more on the loading weight from the extrusions themselves and scintillate. Results of conducted internal pressure tests, including 3- cell, 11-cell and the IPND

  9. Evaluation of a prototype flow cytometry test for serodiagnosis of canine visceral leishmaniasis.

    Science.gov (United States)

    Ker, Henrique Gama; Coura-Vital, Wendel; Aguiar-Soares, Rodrigo Dian de Oliveira; Roatt, Bruno Mendes; das Dores Moreira, Nádia; Carneiro, Cláudia Martins; Machado, Evandro Marques de Menezes; Teixeira-Carvalho, Andréa; Martins-Filho, Olindo Assis; Giunchetti, Rodolfo Cordeiro; Araújo, Márcio Sobreira Silva; Coelho, Eduardo Antonio Ferraz; da Silveira-Lemos, Denise; Reis, Alexandre Barbosa

    2013-12-01

    Diagnosing canine visceral leishmaniasis (CVL) is a critical challenge since conventional immunoserological tests still present some deficiencies. The current study evaluated a prototype flow cytometry serology test, using antigens and fluorescent antibodies that had been stored for 1 year at 4°C, on a broad range of serum samples. Noninfected control dogs and Leishmania infantum-infected dogs were tested, and the prototype test showed excellent performance in differentiating these groups with high sensitivity, specificity, positive and negative predictive values, and accuracy (100% in all analyses). When the CVL group was evaluated according to the dogs' clinical status, the prototype test showed outstanding accuracy in all groups with positive serology (asymptomatic II, oligosymptomatic, and symptomatic). However, in dogs which had positive results by PCR-restriction fragment length polymorphism (RFLP) but negative results by conventional serology (asymptomatic I), serological reactivity was not observed. Additionally, sera from 40 dogs immunized with different vaccines (Leishmune, Leish-Tec, or LBSap) did not present serological reactivity in the prototype test. Eighty-eight dogs infected with other pathogens (Trypanosoma cruzi, Leishmania braziliensis, Ehrlichia canis, and Babesia canis) were used to determine cross-reactivity and specificity, and the prototype test performed well, particularly in dogs infected with B. canis and E. canis (100% and 93.3% specificities, respectively). In conclusion, our data reinforce the potential of the prototype test for use as a commercial kit and highlight its outstanding performance even after storage for 1 year at 4°C. Moreover, the prototype test efficiently provided accurate CVL serodiagnosis with an absence of false-positive results in vaccinated dogs and minor cross-reactivity against other canine pathogens.

  10. Results and analysis of high heat flux tests on a full scale vertical target prototype of ITER divertor

    International Nuclear Information System (INIS)

    Missirlian, M.; Escourbiac, F.; Schlosser, J.; Durocher, A.; Bobin-Vastra, I.

    2004-01-01

    After an extensive development program, a Full-Scale Divertor Target prototype (VTFS) manufactured with all the main features of the corresponding ITER divertor, was intensively tested in the high heat flux FE200 facility. The prototype consists of four units having a full mono-block geometry. The lower part (CFC armour) and the upper part (W armour) of each mono-block were joined to the solution annealed, quenched and cold worked CuCrZr tube by HIP technique. The CFC mono-block was successfully tested up to 1000 cycles at 23 MW/m 2 without any indication of failure. This value is well beyond the ITER design target of 300 cycles at 20 MW/m 2 . The W mono-block endured ∼600 cycles at 10 MW/m 2 . This value of flux is one order of magnitude higher than the ITER design target for the upper part of the vertical target. Fatigue damage is observed when pursuing the cycling up to 15 MW/m 2 . A first stress analysis seems to predict these factual results. However, macro-graphic examinations should bring a better damage valuation. Meanwhile, the fatigue testing will continue on the W healthy part of the VTFS prototype with castellation located on the heated surface (reducing the stresses close to the W-Cu interface). (authors)

  11. Results and analysis of high heat flux tests on a full scale vertical target prototype of ITER divertor

    Energy Technology Data Exchange (ETDEWEB)

    Missirlian, M.; Escourbiac, F.; Schlosser, J.; Durocher, A. [Association Euratom-CEA, Centre d' Etudes de Cadarache, 13 - Saint-Paul-lez-Durance (France). Dept. de Recherches sur la Fusion Controlee; Merola, M. [EFDA Close Support Unit, Garching (Germany); Bobin-Vastra, I. [Framatome, 71 - Le Creusot (France)

    2004-07-01

    After an extensive development program, a Full-Scale Divertor Target prototype (VTFS) manufactured with all the main features of the corresponding ITER divertor, was intensively tested in the high heat flux FE200 facility. The prototype consists of four units having a full mono-block geometry. The lower part (CFC armour) and the upper part (W armour) of each mono-block were joined to the solution annealed, quenched and cold worked CuCrZr tube by HIP technique. The CFC mono-block was successfully tested up to 1000 cycles at 23 MW/m{sup 2} without any indication of failure. This value is well beyond the ITER design target of 300 cycles at 20 MW/m{sup 2}. The W mono-block endured {approx}600 cycles at 10 MW/m{sup 2}. This value of flux is one order of magnitude higher than the ITER design target for the upper part of the vertical target. Fatigue damage is observed when pursuing the cycling up to 15 MW/m{sup 2}. A first stress analysis seems to predict these factual results. However, macro-graphic examinations should bring a better damage valuation. Meanwhile, the fatigue testing will continue on the W healthy part of the VTFS prototype with castellation located on the heated surface (reducing the stresses close to the W-Cu interface). (authors)

  12. SNS EXTRACTION KICKER POWER SUPPLY PROTOTYPE TEST

    International Nuclear Information System (INIS)

    MI, J.L.; SANDBERG, J.; SANDERS, R.; SOUKAS, A.; ZHANG, W.

    2000-01-01

    The SNS (Spallation Neutron Source) accumulator ring Extraction System consists of a Fast kicker and a Lambertson Septum magnet. The proposed design will use 14 kicker magnets powered by an Extraction Kicker Power Supply System. They will eject the high power beam from the SNS accumulator ring into RTBT (Ring to Target Beam Tunnel) through a Lambertson Septum magnet. This paper describes some test results of the SNS Extraction Kicker power supply prototype. The high repetition rate of 60 pulse per second operation is the challenging part of the design. In the prototype testing, a 3 kA damp current of 700ns pulse-width, 200 nS rise time and 60 Hz repetition rate at 32 kV PFN operation voltage has been demonstrated. An Extraction kicker power supply system design diagram is depicted

  13. Test results on the long models and full scale prototypes of the second generation LHC arc dipoles

    CERN Document Server

    Billan, J; Bottura, L; Leroy, D; Pagano, O; Perin, R; Perini, D; Savary, F; Siemko, A; Sievers, P; Spigo, G; Vlogaert, J; Walckiers, L; Wyss, C; Rossi, L

    1999-01-01

    With the test of the first full scale prototype in June-July 1998, the R&D on the long superconducting dipoles based on the LHC design of 1993-95 has come to an end. This second generation of long magnets has a 56 mm coil aperture, is wound with 15 mm wide cable arranged in a 5 coil block layout. The series includes four 10 m long model dipoles, whose coils have been wound and collared in industry and the cold mass assembled and cryostated at CERN, as well as one 15 m long dipole prototype, manufactured totally in industry in the framework of a CERN-INFN collaboration for the LHC. After a brief description of particular features of the design and of the manufacturing, test results are reported and compared with the expectations. One magnet reached the record field for long model dipoles of 9.8 T but results have not been well reproducible from magnet to magnet. Guidelines for modifications that will appear in the next generation of long magnets, based on a six block coil design, are indicated in the concl...

  14. Cell-Phone Tower Power System Prototype Testing for Verizon Wireless |

    Science.gov (United States)

    Advanced Manufacturing Research | NREL Cell-Phone Tower Power System Prototype Testing for Verizon Wireless Cell-Phone Tower Power System Prototype Testing for Verizon Wireless For Verizon Wireless , NREL tested a new cell-phone tower power system prototype based on DC interconnection and photovoltaics

  15. Beam Tests of a Multilayer LumiCal Prototype

    CERN Document Server

    Borysov, O

    2018-01-01

    LumiCal is a sampling electromagnetic calorimeter designed for the precise measurement of in- tegrated luminosity in electron positron linear collider experiments. The present report contains a description and results of the first beam test of a multilayer LumiCal prototype with four sili- con detector planes. A 5 GeV electron beam from the CERN PS T9 facility was used to study the performance of the LumiCal prototype. Presented results are mainly focused on the trans- verse structure of the observed electromagnetic shower and the Molière radius measurement. A comparison with MC simulation is also discussed.

  16. The experimental results and analysis of a borehole radar prototype

    International Nuclear Information System (INIS)

    Liu, Sixin; Wu, Junjun; Dong, Hang; Fu, Lei; Wang, Fei

    2012-01-01

    A prototype of borehole radar has been successfully tested in three sites for different purposes under a field condition. The objective of the prototype is providing an effective down-hole tool for detecting targets in deep boreholes situated in a relatively high conductivity area such as the metal ores. The first testing site is at a geothermal field. The fractures extending more than 20 m from the borehole are delineated by the borehole radar in the single-hole reflection mode. The second testing site is located in a jade mine for basement evaluation. The cross-hole measurement mode was used to detect the cavities made by previous unorganized mining activities. Several high-velocity anomalies were found in the velocity profile and presumably the targets of the mine shafts and tunnels. The third test site is located in a mineralized belt characterized by low resistivity less than 1000 Ohm m, the surface-borehole measurement was carried out and the data were processed with velocity tomography. The low-velocity zone corresponds to a mineralized zone from geological records. The three testing results proved the readiness of this borehole radar prototype for further deployment in more complicated and realistic field situations. (paper)

  17. Design and Beam Test Results for the sPHENIX Electromagnetic and Hadronic Calorimeter Prototypes

    OpenAIRE

    Aidala, C. A.; Bailey, V.; Beckman, S.; Belmont, R.; Biggs, C.; Blackburn, J.; Boose, S.; Chiu, M.; Connors, M.; Franz, A.; Haggerty, J. S.; He, X.; Higdon, M. M.; Huang, J.; Kauder, K.

    2017-01-01

    The sPHENIX experiment at the Relativistic Heavy Ion Collider (RHIC) will perform high precision measurements of jets and heavy flavor observables for a wide selection of nuclear collision systems, elucidating the microscopic nature of strongly interacting matter ranging from nucleons to the strongly coupled quark-gluon plasma. A prototype of the sPHENIX calorimeter system was tested at the Fermilab Test Beam Facility as experiment T-1044 in the spring of 2016. The electromagnetic calorimeter...

  18. Test results from a prototype lead tungstate crystal calorimeter with vacuum phototriode readout for the CMS experiment

    Energy Technology Data Exchange (ETDEWEB)

    Apollonio, M; Barber, G; Bell, K; Britton, D; Brooke, J; Brown, R; Bourotte, J; Camanzi, B; Cockerill, D; Davies, G; Devitsin, E; Gninenko, S; Golubev, N; Goussev, Y; Grafstroem, P; Haguenauer, M; Head, R; Heath, H; Hobson, P; Inyakin, A; Katchanov, V; Kirsanov, M; Lintern, L; Lodge, A; Mcleod, E; Nash, S; Newbold, D; Ukhanov, M; Postoev, V; Patalakha, D; Presland, A; Probert, M; Seez, C; Semeniouk, I; Seliverstov, D; Smith, B; Sproston, M; Tapper, R; Tchuiko, B

    2002-05-21

    Tests of a prototype for the electromagnetic calorimeter (ECAL) of the compact muon solenoid experiment (CMS) at the large hadron collider are described. The basic unit for the endcap ECAL in CMS is a 'supercrystal' of 25 lead tungstate crystals. Results are presented from tests of the first full-sized supercrystal in electron beams and in a 3 T magnetic field. The supercrystal was exposed to electron beams with energies from 25 to 180 GeV. An energy resolution ({sigma}{sub E}/E) of (0.48{+-}0.01)% was measured at 180 GeV.

  19. SIMS Prototype System 4: performance test report

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-09

    The results obtained during testing of a self-contained, preassembled air type solar system, designed for installation remote from the dwelling, to provide space heating and hot water are presented. Data analysis is included which documents the system performance and verifies the suitability of SIMS Prototype System 4 for field installation.

  20. Beam Test Results for Single- and Double-Sided Silicon Detector Prototypes of the CMS Central Detector

    CERN Document Server

    Adriani, O

    1997-01-01

    We report the results of two beam tests performed in July and September 1995 at CERN using silicon microstrip detectors of various types: single sided, double sided with small angle stereo strips, double sided with orthogonal strips, double sided with pads. For the read-out electronics use was made of Preshape32, Premux128 and VA1 chips. The signal to noise ratio and the resolution of the detectors was studied for different incident angles of the incoming particles and for different values of the detector bias voltage. The goal of these tests was to check and improve the performances of the prototypes for the CMS Central Detector.

  1. Test beam results of the first CMS double-sided strip module prototypes using the CBC2 read-out chip

    Energy Technology Data Exchange (ETDEWEB)

    Harb, Ali, E-mail: ali.harb@desy.de; Mussgiller, Andreas; Hauk, Johannes

    2017-02-11

    The CMS Binary Chip (CBC) is a prototype version of the front-end read-out ASIC to be used in the silicon strip modules of the CMS outer tracking detector during the high luminosity phase of the LHC. The CBC is produced in 130 nm CMOS technology and bump-bonded to the hybrid of a double layer silicon strip module, the so-called 2S-p{sub T} module. It has 254 input channels and is designed to provide on-board trigger information to the first level trigger system of CMS, with the capability of cluster-width discrimination and high-p{sub T} track identification. In November 2013 the first 2S-p{sub T} module prototypes equipped with the CBC chips were put to test at the DESY-II test beam facility. Data were collected exploiting a beam of positrons with an energy ranging from 2 to 4 GeV. In this paper the test setup and the results are presented.

  2. Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source

    International Nuclear Information System (INIS)

    M. Stirbet; I.E. Campisi; E.F. Daly; G.K. Davis; M. Drury; P. Kneisel; G. Myneni; T. Powers; W.J. Schneider; K.M. Wilson; Y. Kang; K.A. Cummings; T. Hardek

    2001-01-01

    High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement

  3. Test-Beam Results on <100> Silicon Prototype Detectors with APV6 Front-End Chip Readout

    CERN Document Server

    Winkler, Matthias

    2000-01-01

    Results are presented using data collected during the X5 test-beam performed in August 1999. To achieve a good estimate of signal and noise values, the raw data are processed off-line by a dedicated reconstruction program. In particular, an efficient algorithm for pedestal, noise and common mode calculation was developed and tested. The intrinsic performances of an AC-coupled CMS silicon micro-strip multi-geometry prototype detector, with a <100> crystal orientation and a low resistivity ( 1~k Omega cm), are investigated. This detector was exposed to an irradiation fluence of 3 imes10^{14} p/cm ^2 , equivalent to 10 years of operation at LHC. The signal-to-noise ratio and the ghost rates per strip and per cm ^2 are presented, as a function of the bias voltage.

  4. Performance test for prototype game for children with adhd

    Science.gov (United States)

    Bahana, R.; Gaol, F. L.; Wiguna, T.; Hendric, S. W. H. L.; Soewito, B.; Nugroho, E.; Dirgantoro, B. P.; Abdurachman, E.

    2018-03-01

    The gaming industry has become one of the fastest growing industries in the world. In recent years there have been several studies that have used games, especially computer-based ones to improve the executive function of children with Attention Deficit Hyperactivity Disorder (ADHD) especially in working memory improvements. There are still several obstacles in using computer-based games that have been circulating today in Indonesia. The aim of this research is to develop and create a prototype game that can be used to improve working memory of children with ADHD using Bahasa Indonesia. The prototype game application is a race game with matching colors and memory work tasks; developed using Construct2. Players will play as a driver, delivering certain fruits to specific homes with different colors. The game also included visuospatial tasks such as remembering the objects. For performance test, CPU utilization, average FPS and image memory usage has been tested in several browsers. In conclusion, the performance tests results show that the first type of the prototype game is good enough to be played in desktop or laptop.

  5. Intelligent Network Flow Optimization (INFLO) prototype acceptance test summary.

    Science.gov (United States)

    2015-05-01

    This report summarizes the results of System Acceptance Testing for the implementation of the Intelligent Network : Flow Optimization (INFLO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected : Vehicle Program. ...

  6. Test and evaluation of Alco/BLH prototype sodium-heated steam generator. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kaplan, C.J.; Auge, L.J.; Cho, S.M.; Hanna, R.W.; Prevost, J.R.; Steger, N.A.; Wagner, R.K.

    1971-01-31

    A 30-Mwt prototype sodium-to-sodium intermediate heat exchanger and a 30-Mwt prototype sodium-heated steam generator were tested in combined operation in its Sodium Components Test Installation. This report contains the results of test and evaluation of the steam generator. During plant performance tests, performance degradation was observed, which resulted in the initiation of a diagnostic test series. This test series revealed that under certain operating conditions, the thermohydraulic characteristic of the steam generator changed either suddenly or gradually, resulting in overall performance degradation. A structural failure, requiring retirement of the unit, occurred before the diagnostic test series and analytical support effort were completed. This report describes the thermohydraulic and structural performance, including the structural failures, and related evaluation analyses of the Alco/BLH prototype steam generator performed prior to termination of the test and evaluation program. In addition, the report presents a post-test examination plan to obtain data that could possibly explain the cause of performance anomalies and structural failures experienced during testing.

  7. Fairchild Stratos Division's Type II prototype lockhopper valve: METC Prototype Test Valve No. F-1 prototype lockhopper valve-testing and development project. Static test report

    Energy Technology Data Exchange (ETDEWEB)

    Goff, D. R.; Cutright, R. L.; Griffith, R. A.; Loomis, R. B.; Maxfield, D. A.; Moritz, R. S.

    1981-10-01

    METC Prototype Test Valve No. F-1 is a hybrid design, based on a segmented ball termed a visor valve, developed and manufactured by Fairchild Stratos Division under contract to the Department of Energy. The valve uses a visor arm that rotates into position and then translates to seal. This valve conditionally completed static testing at METC with clean gas to pressures of 1600 psig and internal valve temperatures to 600/sup 0/F. External leakage was excessive due to leakage through the stuffing box, purge fittings, external bolts, and other assemblies. The stuffing box was repacked several times and redesigned midway through the testing, but external leakage was still excessive. Internal leakage through the seats, except for a few anomalies, was very low throughout the 2409 cycles of testing. As shown by the low internal leakage, the visor valve concept appears to have potential for lock-hopper valve applications. The problems that are present with METC Prototype Test Valve No. F-1 are in the seals, which are equivalent to the shaft and bonnet seals in standard valve designs. The operating conditions at these seals are well within the capabilities of available seal designs and materials. Further engineering and minor modifications should be able to resolve the problems identified during static testing.

  8. DWPF Melter No.2 Prototype Bus Bar Test Report

    International Nuclear Information System (INIS)

    Gordon, J.

    2003-01-01

    Characterization and performance testing of a prototype DWPF Melter No.2 Dome Heater Bus Bar are described. The prototype bus bar was designed to address the design features of the existing system which may have contributed to water leaks on Melter No.1. Performance testing of the prototype revealed significant improvement over the existing design in reduction of both bus bar and heater connection maximum temperature, while characterization revealed a few minor design and manufacturing flaws in the bar. The prototype is recommended as an improvement over the existing design. Recommendations are also made in the area of quality control to ensure that critical design requirements are met

  9. Front-end Electronics for Unattended Measurement (FEUM). Prototype Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Ryan C.; Morris, Scott J.; Smith, Leon E.; Keller, Daniel T.

    2015-09-16

    The IAEA has requested that PNNL perform an initial set of tests on front-end electronics for unattended measurement (FEUM) prototypes. The FEUM prototype test plan details the tests to be performed, the criteria for evaluation, and the procedures used to execute the tests.

  10. Gamma irradiation testing of prototype ITER in-vessel magnetic pick-up coils

    International Nuclear Information System (INIS)

    Vermeeren, Ludo; Leysen, Willem

    2013-01-01

    Highlights: ► We tested five prototype ITER in-vessel coils up to a gamma dose of 72 MGy. ► Before and after irradiation thermal tests were also performed from 30 °C till 130 °C. ► The continuity resistances and the insulation resistances were continuously monitored. ► The observed behavior of all coils was satisfactory in all conditions. ► For the further design the mechanical robustness should be taken into account. -- Abstract: To fulfill the requirements for ITER in-vessel magnetic diagnostics, several coil prototypes have been developed, aiming at minimizing the disturbing effects of temperature gradients and radiation induced phenomena. As a first step in the radiation resistance testing of these prototypes, an in-situ high dose rate gamma radiation test on a selection of prototypes was performed. The aim of this test was to get a first experimental feedback regarding the behavior of the pick-up coil prototypes under radiation. Five prototypes (a coil wound with glass-insulated copper wire, two LTCC coils and two HTCC coils) were irradiated at a dose rate of 46 kGy/h up to a total dose of 72 MGy and at a temperature of 50 °C. During the irradiation, the continuity resistances and the insulation resistances were continuously measured. Before and after irradiation reference data were recorded as a function of temperature (from 30 °C to 130 °C). This paper includes the results of the temperature and irradiation tests and a discussion of the behavior of the prototype coils in terms of electrical and mechanical properties

  11. Benchmark tests for a Formula SAE Student car prototyping

    Science.gov (United States)

    Mariasiu, Florin

    2011-12-01

    Aerodynamic characteristics of a vehicle are important elements in its design and construction. A low drag coefficient brings significant fuel savings and increased engine power efficiency. In designing and developing vehicles trough computer simulation process to determine the vehicles aerodynamic characteristics are using dedicated CFD (Computer Fluid Dynamics) software packages. However, the results obtained by this faster and cheaper method, are validated by experiments in wind tunnels tests, which are expensive and were complex testing equipment are used in relatively high costs. Therefore, the emergence and development of new low-cost testing methods to validate CFD simulation results would bring great economic benefits for auto vehicles prototyping process. This paper presents the initial development process of a Formula SAE Student race-car prototype using CFD simulation and also present a measurement system based on low-cost sensors through which CFD simulation results were experimentally validated. CFD software package used for simulation was Solid Works with the FloXpress add-on and experimental measurement system was built using four piezoresistive force sensors FlexiForce type.

  12. Testing of the prototype FMIT target with liquid lithium

    International Nuclear Information System (INIS)

    Miller, W.C.; Annese, C.E.; Berg, J.D.; Miles, R.R.

    1984-01-01

    Testing of a molten lithium target was performed to evaluate hydraulic stability, determine surface evaporation rates, and map the detailed contour of the high speed, free surface wall jet. The results confirmed predictions by demonstrating acceptable performance of a prototype target

  13. Sharing Data between Mobile Devices, Connected Vehicles and Infrastructure Task 6: Prototype Acceptance Test Summary Report

    Science.gov (United States)

    2017-10-30

    The Task 6 Prototype Acceptance Test Summary Report summarizes the results of Acceptance Testing carried out at Battelle facilities in accordance with the Task 6 Acceptance Test Plan. The Acceptance Tests were designed to verify that the prototype sy...

  14. Software testing for evolutionary iterative rapid prototyping

    OpenAIRE

    Davis, Edward V., Jr.

    1990-01-01

    Approved for public release; distribution unlimited. Rapid prototyping is emerging as a promising software development paradigm. It provides a systematic and automatable means of developing a software system under circumstances where initial requirements are not well known or where requirements change frequently during development. To provide high software quality assurance requires sufficient software testing. The unique nature of evolutionary iterative prototyping is not well-suited for ...

  15. Majorana Thermosyphon Prototype Experimental Results

    International Nuclear Information System (INIS)

    Fast, James E.; Reid, Douglas J.; Aguayo Navarrete, Estanislao

    2010-01-01

    The Majorana demonstrator will operate at liquid Nitrogen temperatures to ensure optimal spectrometric performance of its High Purity Germanium (HPGe) detector modules. In order to transfer the heat load of the detector module, the Majorana demonstrator requires a cooling system that will maintain a stable liquid nitrogen temperature. This cooling system is required to transport the heat from the detector chamber outside the shield. One approach is to use the two phase liquid-gas equilibrium to ensure constant temperature. This cooling technique is used in a thermosyphon. The thermosyphon can be designed so the vaporization/condensing process transfers heat through the shield while maintaining a stable operating temperature. A prototype of such system has been built at PNNL. This document presents the experimental results of the prototype and evaluates the heat transfer performance of the system. The cool down time, temperature gradient in the thermosyphon, and heat transfer analysis are studied in this document with different heat load applied to the prototype.

  16. Prototype heater test of the environment around a simulated waste package

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Buscheck, T.A.; Carlson, R.; Daily, W.; Latorre, V.R.; Lee, K; Lin, Wunan; Mao, Nai-hsien; Towse, D.; Ueng, Tzou-Shin; Watwood, D.

    1991-01-01

    This paper presents selected results obtained during the 301 day duration of the Prototype Engineered Barrier System Field Test (PEBSFT) performed in G-Tunnel within the Nevada Test Site. The test described is a precursor to the Engineered Barrier Systems Field Tests (EBSFT) planned for the Exploratory Shaft Facility in Yucca Mountain. The EBSFT will consist of in situ tests of the geohydrologic and geochemical environment in the near field (within a few meters) of heaters emplaced in welded tuff to simulate the thermal effects of waste packages. The paper discusses the evolution of hydrothermal behavior during the prototype test, including rock temperatures, changes in rock moisture content, air permeability of fractures and gas-phase humidity in the heater borehole

  17. Fabrication and test of prototype ring magnets for the ALS [Advanced Light Source

    International Nuclear Information System (INIS)

    Tanabe, J.; Avery, R.; Caylor, R.; Green, M.I.; Hoyer, E.; Halbach, K.; Hernandez, S.; Humphries, D.; Kajiyama, Y.; Keller, R.; Low, W.; Marks, S.; Milburn, J.; Yee, D.

    1989-03-01

    Prototype Models for the Advanced Light Source (ALS) Booster Dipole, Quadrupole and Sextupole and the Storage Ring Gradient Magnet, Quadrupole and Sextupole have been constructed. The Booster Magnet Prototypes have been tested. The Storage Ring Magnets are presently undergoing tests and magnetic measurements. This paper reviews the designs and parameters for these magnets, briefly describes features of the magnet designs which respond to the special constraints imposed by the requirements for both accelerator rings, and reviews some of the results of magnet measurements for the prototype. 13 refs., 7 figs., 1 tab

  18. Prototype test for the PANDA barrel DIRC

    Energy Technology Data Exchange (ETDEWEB)

    Dzhygadlo, Roman; Gerhardt, Andreas; Kalicy, Grzegorz; Krebs, Marvin; Lehmann, Dorothe; Schwarz, Carsten; Schwiening, Jochen; Belias, Anastasios; Traxler, Michael [GSI Helmholtzzentrum fur Schwerionenforschung GmbH, Darmstadt (Germany); Peters, Klaus [GSI Helmholtzzentrum fur Schwerionenforschung GmbH, Darmstadt (Germany); Goethe-Universitaet Frankfurt (Germany); Collaboration: PANDA-Collaboration

    2016-07-01

    The Barrel DIRC (Detector of Internally Reflected Cherenkov light) is designed to provide particle identification (PID) for the PANDA experiment at the new Facility for Antiproton and Ion Research in Europe (FAIR) at GSI, Darmstadt. It is based on the successful BABAR DIRC detector with several key improvements, such as focusing optics, fast timing, and a compact expansion volume. A large prototype was constructed and tested in a hadronic particle beam at CERN during the summer of 2015 to test the PID performance of different design options. The prototype included a fused silica radiator (either a narrow bar or a wide plate), an optional focusing lens, and a prism-shaped fused silica expansion volume. An array of microchannel-plate photomultiplier tubes measured the location and arrival time of the Cherenkov photons on 960 pixels. Data were collected for two radiator geometries and several types of focusing lenses at different beam momenta and polar angles. Results of the analysis as well as a comparison to the Geant4 simulation are presented.

  19. The influence of prototype testing in three-dimensional aortic models on fenestrated endograft design.

    Science.gov (United States)

    Taher, Fadi; Falkensammer, Juergen; McCarte, Jamie; Strassegger, Johann; Uhlmann, Miriam; Schuch, Philipp; Assadian, Afshin

    2017-06-01

    The fenestrated Anaconda endograft (Vascutek/Terumo, Inchinnan, UK) is intended for the treatment of abdominal aortic aneurysms with an insufficient infrarenal landing zone. The endografts are custom-made with use of high-resolution, 1-mm-slice computed tomography angiography images. For every case, a nonsterile prototype and a three-dimensional (3D) model of the patient's aorta are constructed to allow the engineers as well as the physician to test-implant the device and to review the fit of the graft. The aim of this investigation was to assess the impact of 3D model construction and prototype testing on the design of the final sterile endograft. A prospectively held database on fenestrated endovascular aortic repair patients treated at a single institution was completed with data from the Vascutek engineers' prototype test results as well as the product request forms. Changes to endograft design based on prototype testing were assessed and are reported for all procedures. Between April 1, 2013, and August 18, 2015, 60 fenestrated Anaconda devices were implanted. Through prototype testing, engineers were able to identify and report potential risks to technical success related to use of the custom device for the respective patient. Theoretical concerns about endograft fit in the rigid model were expressed in 51 cases (85.0%), and the engineers suggested potential changes to the design of 21 grafts (35.0%). Thirteen cases (21.7%) were eventually modified after the surgeon's testing of the prototype. A second prototype was ordered in three cases (5.0%) because of extensive changes to endograft design, such as inclusion of an additional fenestration. Technical success rates were comparable for grafts that showed a perfect fit from the beginning and cases in which prototype testing resulted in a modification of graft design. Planning and construction of fenestrated endografts for complex aortic anatomies where exact fit and positioning of the graft are paramount to

  20. Prototype Engineered Barrier System Field Tests (PEBSFT)

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Wilder, D.G.

    1991-02-01

    This progress report presents the interpretation of data obtained (up to November 1, 1988) from the Prototype Engineered Barrier System Field Tests (PEBSFT) that are being performed for the Yucca Mountain Project (YMP) in G-Tunnel within the Nevada Test site. The PEBSFTs are being conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for the field tests for future investigations that will be conducted in the Exploratory Shaft Facilities, at a potential high-level radioactive waste repository site in Yucca Mountain. The primary objective of the tests is to provide the basis for determining whether tests planned for Yucca Mountain have the potential to be successful. Thirteen chapters discuss the following: mapping the electromagnetic permittivity and attenuation rate of the rock mass; changes in moisture content detected by the neutron logging probe; characterization of the in-situ permeability of the fractured tuff around the heater borehole; electrical resistance heater installed in a 30-cm borehole; relative humidity measurements; the operation, design, construction, calibration, and installation of a microwave circuit that might provide partial pressure information at temperatures in excess of 200 degree C (392 degree F); pressure and temperature measurements in the G-Tunnel; the moisture collection system, which attempts to collect steam that migrates into the heater borehole; The borehole television and borescope surveys that were performed to map the location, orientation, and aperture of the fractures intersecting the boreholes; preliminary scoping calculations of the hydrothermal conditions expected for this prototype test; the Data Acquisition System; and the results of the PEBSFT, preliminary interpretations of these results, and plans for the remainder of the test. Chapters have been indexed separately for inclusion on the data base

  1. A software prototype development of human system interfaces for human factors engineering validation tests of SMART MCR

    International Nuclear Information System (INIS)

    Lim, Jong Tae; Han, Kwan Ho; Yang, Seung Won

    2011-02-01

    An integrated system validation test bed used for human factors engineering validation test is being developed. This study has a goal to develop a software prototype for HFE validation of SMART MCR design. To achieve these, first, some prototype specifications of the software was developed. Then software prototypes of alarm reduction logic system, Plant Protection System, ESF-CCS, Elastic Tile Alarm Indication, and EID-based HSIs were implemented as codes. Test procedures for the software prototypes were established to verify the completeness of the codes implemented. The careful software test has been done according to these test procedures, and the result were documented

  2. SLD liquid argon calorimeter prototype test results

    International Nuclear Information System (INIS)

    Dubois, R.; Eigen, G.; Au, Y.

    1985-10-01

    The results of the SLD test beam program for the selection of a calorimeter radiator composition within a liquid argon system are described, with emphasis on the study of the use of uranium to obtain equalization of pion and electron responses

  3. Manufacturing experience and test results of the PS prototype flexible hybrid circuit for the CMS Tracker Upgrade

    CERN Document Server

    Kovacs, Mark Istvan; Gadek, Tomasz; Honma, Alan; Vasey, Francois

    2017-01-01

    The CMS Tracker Phase-2 Upgrade for HL-LHC requires High Density Interconnect (HDI) flexible hybrid circuits to build modules with low mass and high granularity. The hybrids are carbon fibre reinforced flexible circuits with flip-chips and passives. Three different manufacturers produced prototype hybrids for the Pixel-Strip type modules. The first part of the presentation will focus on the design challenges of this state of the art circuit. Afterwards, the difficulties and experience related to the circuit manufacturing and assembly are presented. The description of quality inspection methods with comprehensive test results will lead to the conclusion.

  4. The Prototype Fundamental Power Coupler For The Spallation Neutron Source Superconducting Cavities: Design And Initial Test Results

    International Nuclear Information System (INIS)

    K. M. Wilson; I. E. Campisi; E. F. Daly; G. K. Davis; M. Drury; J. E. Henry; P. Kneisel; G. Myneni; T. Powers; W. J. Schneider; M. Stirbet; Y. Kang; K. Cummings; T. Hardek

    2001-01-01

    Each of the 805 MHz superconducting cavities of the Spallation Neutron Source (SNS) is powered via a coaxial Fundamental Power Coupler (FPC) with a 50 Omega impedance and a warm planar alumina window. The design is derived from the experience of other laboratories; in particular, a number of details are based on the coupler developed for the KEK B-Factory superconducting cavities. However, other design features have been modified to account for the fact that the SNS FPC will transfer a considerably lower average power than the KEK-B coupler. Four prototypes have been manufactured so far, and preliminary tests performed on two of them at Los Alamos National Laboratory (LANL). During these tests, peak powers of over 500 kW were transferred through the couplers in the test stand designed and built for this purpose. This paper gives details of the coupler design and of the results obtained from the RF tests on the test stand during the last few months. A more comprehensive set of tests is planned for the near future

  5. Construction and test of the final CMS Barrel Drift Tube Muon Chamber prototype

    Energy Technology Data Exchange (ETDEWEB)

    Aguilar-Benitez, M.; Alberdi, J.; Arneodo, M.; Banicz, K.; Benettoni, M.; Benvenuti, A.; Bethke, S.; Cerrada, M. E-mail: cerrada@ciemat.es; Cirio, R.; Colino, N.; Conti, E.; Dallavalle, M.; Daniel, M.; Dattola, D.; Daudo, F.; De Giorgi, M.; Dosselli, U.; Fanfani, A.; Fanin, C.; Fouz, M.C.; Gasparini, F.; Gasparini, U.; Giacomelli, P.; Giordano, V.; Gonella, F.; Grandi, C.; Guaita, P.; Guerzoni, M.; Lacaprara, S.; Lippi, I.; Marcellini, S.; Marin, J.; Martinelli, R.; Maselli, S.; Meneguzzo, A.; Migliore, E.; Mocholi, J.; Monaco, V.; Montanari, A.; Montanari, C.; Odorici, F.; Oller, J.C.; Paoletti, S.; Passaseo, M.; Pegoraro, M.; Peroni, C.; Puerta, J.; Reithler, H.; Romero, A.; Romero, L.; Ronchese, P.; Rossi, A.M.; Rovelli, T.; Sacchi, R.; Salicio, J.M.; Staiano, A.; Steinbeck, T.; Torassa, E.; Travaglini, R.; Ventura, L.; Ventura, S.; Vitelli, A.; Voetee, F.; Wegner, M.; Willmott, C.; Zotto, P.; Zumerle, G

    2002-03-21

    A prototype of the CMS Barrel Muon Detector incorporating all the features of the final chambers was built using the mass production assembly procedures and tools. The performance of this prototype was studied in a muon test beam at CERN and the results obtained are presented in this paper.

  6. Air injection test on a Kaplan turbine: prototype - model comparison

    Science.gov (United States)

    Angulo, M.; Rivetti, A.; Díaz, L.; Liscia, S.

    2016-11-01

    Air injection is a very well-known resource to reduce pressure pulsation magnitude in turbines, especially on Francis type. In the case of large Kaplan designs, even when not so usual, it could be a solution to mitigate vibrations arising when tip vortex cavitation phenomenon becomes erosive and induces structural vibrations. In order to study this alternative, aeration tests were performed on a Kaplan turbine at model and prototype scales. The research was focused on efficiency of different air flow rates injected in reducing vibrations, especially at the draft tube and the discharge ring and also in the efficiency drop magnitude. It was found that results on both scales presents the same trend in particular for vibration levels at the discharge ring. The efficiency drop was overestimated on model tests while on prototype were less than 0.2 % for all power output. On prototype, air has a beneficial effect in reducing pressure fluctuations up to 0.2 ‰ of air flow rate. On model high speed image computing helped to quantify the volume of tip vortex cavitation that is strongly correlated with the vibration level. The hydrophone measurements did not capture the cavitation intensity when air is injected, however on prototype, it was detected by a sonometer installed at the draft tube access gallery.

  7. Prototype steam generator test at SCTI/ETEC. Acoustic program test plan

    International Nuclear Information System (INIS)

    Greene, D.A.; Thiele, A.; Claytor, T.N.

    1981-10-01

    This document is an integrated test plan covering programs at General Electric (ARSD), Rockwell International (RI) and Argonne National Laboratory (CT). It provides an overview of the acoustic leak detection test program which will be completed in conjunction with the prototype LMFBR steam generator at the Energy Technology Engineering Laboratory. The steam generator is installed in the Sodium Components Test Installation (SCTI). Two acoustic detection systems will be used during the test program, a low frequency system developed by GE-ARSD (GAAD system) and a high frequency system developed by RI-AI (HALD system). These systems will be used to acquire data on background noise during the thermal-hydraulic test program. Injection devices were installed during fabrication of the prototype steam generator to provide localized noise sources in the active region of the tube bundle. These injectors will be operated during the steam generator test program, and it will be shown that they are detected by the acoustic systems

  8. Implementation and initial test result of a prototype solid state modulator for pulsed magnetron

    International Nuclear Information System (INIS)

    Dake, Vishal; Mangalvedekar, H.A.; Tillu, Abhijit; Dixit, Kavita P.; Sarukte, Hemant

    2014-01-01

    A solid-state modulator rated for 50 kV, 120A, 4μs and 250 Hz has been designed. The discharging circuit of the modulator is being tested at ∼ 33 kV, 40-80A, at a maximum pulse repetition rate of 30 pps. The paper discusses development and testing of prototype discharging circuit on resistive load and magnetron. The technique used for measurement of pulse transformer leakage inductance, distributed capacitance and stray primary circuit series inductance will also be discussed in detail. It is necessary to have Energy Storage Capacitors with low ESL for these applications (ESL < 40 nH). The method used for evaluating the ESL of locally available metalized polypropylene capacitors will also be presented. (author)

  9. Implementation and initial test result of a prototype solid state modulator for pulsed magnetron

    Energy Technology Data Exchange (ETDEWEB)

    Dake, Vishal; Mangalvedekar, H.A., E-mail: vishaldake90@gmail.com [Veermata Jijabai Technological Institute, Mumbai (India); Tillu, Abhijit; Dixit, Kavita P.; Sarukte, Hemant [Accelerator and Pulse Power Division, Bhabha Atomic Research Centre, Mumbai (India)

    2014-07-01

    A solid-state modulator rated for 50 kV, 120A, 4μs and 250 Hz has been designed. The discharging circuit of the modulator is being tested at ∼ 33 kV, 40-80A, at a maximum pulse repetition rate of 30 pps. The paper discusses development and testing of prototype discharging circuit on resistive load and magnetron. The technique used for measurement of pulse transformer leakage inductance, distributed capacitance and stray primary circuit series inductance will also be discussed in detail. It is necessary to have Energy Storage Capacitors with low ESL for these applications (ESL < 40 nH). The method used for evaluating the ESL of locally available metalized polypropylene capacitors will also be presented. (author)

  10. Automated Test Case Generation for an Autopilot Requirement Prototype

    Science.gov (United States)

    Giannakopoulou, Dimitra; Rungta, Neha; Feary, Michael

    2011-01-01

    Designing safety-critical automation with robust human interaction is a difficult task that is susceptible to a number of known Human-Automation Interaction (HAI) vulnerabilities. It is therefore essential to develop automated tools that provide support both in the design and rapid evaluation of such automation. The Automation Design and Evaluation Prototyping Toolset (ADEPT) enables the rapid development of an executable specification for automation behavior and user interaction. ADEPT supports a number of analysis capabilities, thus enabling the detection of HAI vulnerabilities early in the design process, when modifications are less costly. In this paper, we advocate the introduction of a new capability to model-based prototyping tools such as ADEPT. The new capability is based on symbolic execution that allows us to automatically generate quality test suites based on the system design. Symbolic execution is used to generate both user input and test oracles user input drives the testing of the system implementation, and test oracles ensure that the system behaves as designed. We present early results in the context of a component in the Autopilot system modeled in ADEPT, and discuss the challenges of test case generation in the HAI domain.

  11. Seismic testing and analysis of a prototypic nonlinear piping system

    International Nuclear Information System (INIS)

    Barta, D.A.; Anderson, M.J.; Severud, L.K.

    1982-11-01

    A series of seismic tests and analyses of a nonlinear Fast Flux Test Facility (FFTF) prototypic piping system are described, and measured responses are compared with analytical predictions. The test loop was representative of a typical LMFBR insulated small bore piping system and it was supported from a rigid test frame by prototypic dead weight supports, mechanical snubbers and pipe clamps. Various piping support configurations were tested and analyzed to evaluate the effects of free play and other nonlinear stiffness characteristics on the piping system response

  12. Ground testing of an SP-100 prototypic reactor

    International Nuclear Information System (INIS)

    Motwani, K.; Pflasterer, G.R.; Upton, H.; Lazarus, J.D.; Gluck, R.

    1988-01-01

    SP-100 is a space power system which is being developed by GE to meet future space electrical power requirements. The ground testing of an SP-100 prototypic reactor system will be conducted at the Westinghouse Hanford Company site located at Richland, Washington. The objective of this test is to demonstrate the performance of a full scale prototypic reactor system, including the reactor, control system and flight shield. The ground test system is designed to simulate the flight operating conditions while meeting all the necessary nuclear safety requirements in a gravity environment. The goal of the reactor ground test system is to establish confidence in the design maturity of the SP-100 space reactor power system and resolve the technical issues necessary for the development of a flight mission design

  13. A beam test of prototype time projection chamber using micro ...

    Indian Academy of Sciences (India)

    We conducted a series of beam tests of prototype TPCs for the international linear collider (ILC) experiment, equipped with an MWPC, a MicroMEGAS, or GEMs as a readout device. The prototype operated successfully in a test beam at KEK under an axial magnetic field of up to 1 T. The analysis of data is now in progress ...

  14. Quench protection test results and comparative simulations on the first 10 meter prototype dipoles for the Large Hadron Collider

    International Nuclear Information System (INIS)

    Rodriguez-Mateos, F.; Gerin, G.; Marquis, A.

    1996-01-01

    The first 10 meter long dipole prototypes made by European Industry within the framework of the R and D program for the Large Hadron Collider (LHC) have been tested at CERN. As a part of the test program, a series of quench protection tests have been carried out in order to qualify the basic protection scheme foreseen for the LHC dipoles (quench heaters and cold diodes). Results are presented on the quench heater performance, and on the maximum temperatures and voltages observed during quenches under the so-called machine conditions. Moreover, an update of the quench simulation package specially developed at CERN (QUABER 2) has been recently made. Details on this new version of QUABER are given. Simulation runs have been made specifically to validate the model with the results from the measurements on quench protection mentioned above

  15. Suitability Screening Test for Marine Corps Air Traffic Controllers Phase 3: Non-cognitive Test Validation and Cognitive Test Prototype

    Science.gov (United States)

    2014-06-01

    developed, pilot tested, and in its Beta form. Findings or Results The subset of NCAPS traits that demonstrated statistically significant prediction for...development and initial pilot testing of the Prototype Marine ATC Cognitive Test. Method The validation approach chosen for this project was a criterion... multitasking ability, and 5) inductive reasoning ability. A working memory capacity test was developed because working memory has been linked to

  16. Light Guide Collector Prototype: Laboratory Testing

    OpenAIRE

    Jitka - Mohelnikova; Stanislav Darula; Ayodeji Omishore; Petr Mohelnik; Denis Micek

    2017-01-01

    The article reviews the potential of light guide system equipped by a concentrator device capturing daylight applicable for illumination of building interiors and presents results of experiments on performance of its prototype. The main goal is focused on the comparison of traditional solutions and newly developed prototype of the light guide system and presents examination of its light transmission efficiency based on the laboratory experiments.

  17. First results of the CALICE SDHCAL technological prototype

    CERN Document Server

    Buridon, V.; Caponetto, L.; Ete, R.; Garillot, G.; Grenier, G.; Han, R.; Ianigro, J.C.; Kieffer, R.; Laktineh, I.; Lumb, N.; Mathez, H.; Mirabito, L.; Petrukhin, A.; Steen, A.; Antequera, J.Berenguer; Alamillo, E.Calvo; Fouz, M.C.; Marin, J.; Puerta-Pelayo, J.; Verdugo, A.; Cortina Gil, E.; Mannai, S.; Cauwenbergh, S.; Tytgat, M.; Pingault, A.; Zaganidis, N.; Anduze, M.; Balagura, V.; Belkadhi, K.; Boudry, V.; Brient, J-C.; Cornat, R.; Frotin, M.; Gastaldi, F.; Haddad, Y.; Ruan, M.; Shpak, K.; Videau, H.; Yu, D.; Callier, S.; Conforti di Lorenzo, S.; Dulucq, F.; Martin-Chassard, G.; de la Taille, Ch.; Raux, L.; Seguin-Moreau, N.; Boumediene, D.; Carloganu, C.; Francais, V.; Bonis, J.; Bouquet, B.; Cornebise, P.; Doublet, Ph.; Faucci-Giannelli, M.; Frisson, T.; Guilhem, G.; Li, H.; Richard, F.; Poschl, R.; Rouene, J.; Wicek, F.; Zhang, Z.; Deng, Z.; Li, Y.; Wang, Y.; Yue, Q.; Yang, Z.; Cho, G.; Kim, D-W.; Lee, S.C.; Park, W.; Vallecorsa, S.; Brianne, E.; Ebrahimi, A.; Gadow, K.; Gottlicher, P.; Gunter, C.; Hartbrich, O.; Hermberg, B.; Irles, A.; Krivan, F.; Kruger, K.; Kvasnicka, J.; Lu, S.; Lutz, B.; Morgunov, V.; Provenza, A.; Reinecke, M.; Sefkow, F.; Schuwalow, S.; Tran, H.L.; Garutti, E.; Laurien, S.; Matysek, M.; Ramilli, M.; Schroeder, S.; Bilki, B.; Norbeck, E.; Northacker, D.; Onel, Y.; Kirikova, N.; Kozlov, V.; Smirnov, P.; Soloviev, Y.; Chadeeva, M.; Danilov, M.; Gabriel, M.; Goecke, P.; Kiesling, C.; van der Kolk, N.; Simon, F.; Soldner, C.; Szalay, M.; Weuste, L.; Jeans, D.; Komamiya, S.; Nakanishi, H.; Benchekroun, D.; Hoummada, A.; Khoulaki, Y.

    2016-04-01

    The CALICE Semi-Digital Hadronic Calorimeter (SDHCAL) prototype, built in 2011, was exposed to beams of hadrons, electrons and muons in two short periods in 2012 on two different beam lines of the CERN SPS. The prototype with its 48 active layers, made of Glass Resistive Plate Chambers and their embedded readout electronics, was run in triggerless and power-pulsing mode. The performance of the SDHCAL during the test beam was found to be very satisfactory with an efficiency exceeding 90% for almost all of the 48 active layers. A linear response (within 5%) and a good energy resolution are obtained for a large range of hadronic energies (5-80GeV) by applying appropriate calibration coefficients to the collected data for both the Digital (Binary) and the Semi-Digital (Multi-threshold) modes of the SDHCAL prototype. The Semi-Digital mode shows better performance at energies exceeding 30GeV

  18. Testing and Analysis of the First Plastic Melt Waste Compactor Prototype

    Science.gov (United States)

    Pace, Gregory S.; Fisher, John W.

    2005-01-01

    A half scale Plastic Melt Waste Compactor prototype has been developed at NASA Ames Research Center. The half scale prototype unit will lead to the development of a full scale Plastic Melt Waste Compactor prototype that is representative of flight hardware that would be used on near and far term space missions. This report details the testing being done on the prototype Plastic Melt Waste Compactor by the Solid Waste Management group at NASA Ames Research Center. The tests are designed to determine the prototype's functionality, simplicity of operation, ability to contain and control noxious off-gassing, biological stability of the processed waste, and water recovery potential using a waste composite that is representative of the types of wastes produced on the International Space Station, Space Shuttle, MIR and Skylab missions.

  19. Virtual prototyping of drop test using explicit analysis

    Science.gov (United States)

    Todorov, Georgi; Kamberov, Konstantin

    2017-12-01

    Increased requirements for reliability and safety, included in contemporary standards and norms, has high impact over new product development. New numerical techniques based on virtual prototyping technology, facilitates imrpoving product development cycle, resutling in reduced time/money spent for this stage as well as increased knowledge about certain failure mechanism. So called "drop test" became nearly a "must" step in development of any human operated product. This study aims to demonstrate dynamic behaviour assessment of a structure under impact loads, based on virtual prototyping using a typical nonlinear analysis - explicit dynamics. An example is presneted, based on a plastic container that is used as cartridge for a dispenser machine exposed to various work conditions. Different drop orientations were analyzed and critical load cases and design weaknesses have been found. Several design modifications have been proposed, based on detailed analyses results review.

  20. Production Facility Prototype Blower 1000 Hour Test Results II

    Energy Technology Data Exchange (ETDEWEB)

    Wass, Alexander Joseph [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Woloshun, Keith Albert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dale, Gregory E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dalmas, Dale Allen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Romero, Frank Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-08

    Long duration tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks were not included in these tests. Five 1000 hour tests have been completed since the first test was performed in January of 2016. All five 1000 hour tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for each test, including a review of the first and second tests, are included in this report.

  1. Light Guide Collector Prototype: Laboratory Testing

    Directory of Open Access Journals (Sweden)

    Jitka - Mohelnikova

    2017-12-01

    Full Text Available The article reviews the potential of light guide system equipped by a concentrator device capturing daylight applicable for illumination of building interiors and presents results of experiments on performance of its prototype. The main goal is focused on the comparison of traditional solutions and newly developed prototype of the light guide system and presents examination of its light transmission efficiency based on the laboratory experiments.

  2. Tests of a Roman Pot Prototype for the TOTEM Experiment

    CERN Document Server

    Deile, M.; Anelli, G.M.; Antchev, G.A.; Ayache, M.; Caspers, F.; Dimovasili, E.; Dinapoli, R.; Drouhin, F.D.; Eggert, K.; Escourrou, L.; Fochler, O.; Gill, K.; Grabit, R.; Haug, F.; Jarron, P.; Kaplon, J.; Kroyer, T.; Luntama, T.; Macina, D.; Mattelon, E.; Mirabito, L.; Niewiadomski, H.; Noschis, E.P.; Oriunno, M.; Park, A.; Perrot, A.L.; Pirotte, O.; Quetsch, J.M.; Regnier, F.; Ruggiero, G.; Saramad, S.; Siegrist, P.; Snoeys, W.; Souissi, T.; Szczygiel, R.; Troska, J.; Vasey, F.; Verdier, A.; Avati, V.; Jarvinen, M.; Kalliokoski, M.; Kalliopuska, J.; Kurvinen, K.; Lauhakangas, R.; Oljemark, F.; Orava, R.; Palmieri, V.; Saarikko, H.; Soininen, A.; Osterberg, K.; Berardi, V.; Catanesi, M.G.; Radicioni, E.; Boccone, V.; Bozzo, M.; Buzzo, A.; Cuneo, S.; Ferro, F.; Macri, M.; Minutoli, S.; Morelli, A.; Musico, P.; Negri, M.; Santroni, A.; Sette, G.; Sobol, A.; Da Via, C.; Hasi, J.; Kok, A.; Watts, S.; Kasper, J.; Kundrat, V.; Lokajicek, M.; Smotlacha, J.

    2005-01-01

    The TOTEM collaboration has developed and tested the first prototype of its Roman Pots to be operated in the LHC. TOTEM Roman Pots contain stacks of 10 silicon detectors with strips oriented in two orthogonal directions. To measure proton scattering angles of a few microradians, the detectors will approach the beam centre to a distance of 10 sigma + 0.5 mm (= 1.3 mm). Dead space near the detector edge is minimised by using two novel "edgeless" detector technologies. The silicon detectors are used both for precise track reconstruction and for triggering. The first full-sized prototypes of both detector technologies as well as their read-out electronics have been developed, built and operated. The tests took place first in a fixed-target muon beam at CERN's SPS, and then in the proton beam-line of the SPS accelerator ring. We present the test beam results demonstrating the successful functionality of the system despite slight technical shortcomings to be improved in the near future.

  3. Tests of a Roman Pot prototype for the TOTEM experiment

    Science.gov (United States)

    Deile, M.; Alagoz, E.; Anelli, G.; Antchev, G.; Ayache, M.; Caspers, F.; Dimovasili, E.; Dinapoli, R.; Drouhin, F.; Eggert, K.; Escourrou, J.L; Fochler, O.; Gill, K.; Grabit, R.; Haung, F.; Jarron, P.; Kaplon, J.; Kroyer, T.; Luntama, T.; Macina, D.; Mattelon, E.; Niewiadomski, H.; Mirabito, L.; Noschis, E.P.; Oriunno, M.; Park, a.; Perrot, A.-L.; Pirotte, O.; Quetsch, J.M.; Regnier, F.; Ruggiero, G.; Saramad, S.; Siegrist, P.; Snoeys, W.; sSouissi, T.; Szczygiel, R.; Troska, J.; Vasey, F.; Verdier, A.; Da Vià, C.; Hasi, J.; Kok, A.; Watts, S.; Kašpar, J.; Kundrát, V.; Lokajíček, M.V.; Smotlacha, J.; Avati, V.; Järvinen, M.; Kalliokoski, M.; Kalliopuska, J.; Kurvinen, K.; Lauhakangas, R.; Oljemark, F.; Orava, R.; Österberg, K.; Palmieri, V.; Saarikko, H.; Soininen, A.; Boccone, V.; Bozzo, M.; Buzzo, A.; Cuneo, S.; Ferro, F.; Macrí, M.; Minutoli, S.; Morelli, A.; Musico, P.; Negri, M.; Santroni, A.; Sette, G.; Sobol, A.; sBerardi, V.; Catanesi, M.G.; Radicioni, E.

    The TOTEM collaboration has developed and tested the first prototype of its Roman Pots to be operated in the LHC. TOTEM Roman Pots contain stacks of 10 silicon detectors with strips oriented in two orthogonal directions. To measure proton scattering angles of a few microradians, the detectors will approach the beam centre to a distance of 10 sigma + 0.5 mm (= 1.3 mm). Dead space near the detector edge is minimised by using two novel "edgeless" detector technologies. The silicon detectors are used both for precise track reconstruction and for triggering. The first full-sized prototypes of both detector technologies as well as their read-out electronics have been developed, built and operated. The tests took place first in a fixed-target muon beam at CERN's SPS, and then in the proton beam-line of the SPS accelerator ring. We present the test beam results demonstrating the successful functionality of the system despite slight technical shortcomings to be improved in the near future.

  4. Test Report for Perforated Metal Air Transportable Package (PMATO) Prototype.

    Energy Technology Data Exchange (ETDEWEB)

    Bobbe, Jeffery G.; Pierce, Jim Dwight

    2003-06-01

    A prototype design for a plutonium air transport package capable of carrying 7.6 kg of plutonium oxide and surviving a ''worst-case'' plane crash has been developed by Sandia National Laboratories (SNL) for the Japan Nuclear Cycle Development Institute (JNC). A series of impact tests were conducted on half-scale models of this design for side, end, and comer orientations at speeds close to 282 m/s onto a target designed to simulate weathered sandstone. These tests were designed to evaluate the performance of the overpack concept and impact-limiting materials in critical impact orientations. The impact tests of the Perforated Metal Air Transportable Package (PMATP) prototypes were performed at SNL's 10,000-ft rocket sled track. This report describes test facilities calibration and environmental testing methods of the PMATP under specific test conditions. The tests were conducted according to the test plan and procedures that were written by the authors and approved by SNL management and quality assurance personnel. The result of these tests was that the half-scale PMATP survived the ''worst-case'' airplane crash conditions, and indicated that a full-scale PMATP, utilizing this overpack concept and these impact-limiting materials, would also survive these crash conditions.

  5. First results of the CALICE SDHCAL technological prototype

    International Nuclear Information System (INIS)

    2016-01-01

    The CALICE Semi-Digital Hadronic Calorimeter (SDHCAL) prototype, built in 2011, was exposed to beams of hadrons, electrons and muons in two short periods in 2012 on two different beam lines of the CERN SPS. The prototype with its 48 active layers, made of Glass Resistive Plate Chambers and their embedded readout electronics, was run in triggerless and power-pulsing mode. The performance of the SDHCAL during the test beam was found to be very satisfactory with an efficiency exceeding 90% for almost all of the 48 active layers. A linear response (within ± 5%) and a good energy resolution are obtained for a large range of hadronic energies (5–80 GeV) by applying appropriate calibration coefficients to the collected data for both the Digital (Binary) and the Semi-Digital (Multi-threshold) modes of the SDHCAL prototype. The Semi-Digital mode shows better performance at energies exceeding 30 GeV

  6. The SSC full cell prototype string test

    International Nuclear Information System (INIS)

    Kraushaar, P.; Burgett, W.; Cromer, L.

    1994-11-01

    At the conclusion of the SSC half cell magnet string testing program. In February, 1993, the preliminary data analysis revealed that several substantive technical questions remained unresolved. These questions were: (1) could the high voltages to ground (>2 kV) measured during fault (quench) conditions be substantially reduced, (2) could the number of magnetic elements that became resistive (quenched) be controlled and (3) did the cryostats of the magnetic elements provide adequate insulation and isolation to meet designed refrigeration loads. To address these and other existing question a prototypical full cell of collider magnets (ten dipoles and two quadrupoles) was assembled and tested. At the conclusion of this testing there were definitive answers to most of the questions with numerical substantiation, the notable exception being the beat leak question. These answers and other results and issues are presented in this paper

  7. The SSC full cell prototype string test

    International Nuclear Information System (INIS)

    McInturff, A.D.; Kraushaar, P.; Burgett, W.; Cromer, L.

    1994-01-01

    At the conclusion of the SSC half cell magnet string testing program in February, 1993, the preliminary data analysis revealed that several substantive technical questions remained unresolved. These questions were: (1) could the high voltages to ground (>2 kV) measured during fault (quench) conditions be substantially reduced, (2) could the number of magnetic elements that became resistive (quenched) be controlled and 3) did the cryostats of the magnetic elements provide adequate insulation and isolation to meet designed refrigeration loads. To address these and other existing questions, a prototypical fall cell of collider magnets (ten dipoles and two quadrupoles) was assembled and tested. At the conclusion of this testing there were definitive answers to most of the questions with numerical substantiation, the notable exception being the beat leak question. These answers and other results and issues are presented in this paper

  8. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    International Nuclear Information System (INIS)

    Banetta, S.; Bellin, B.; Lorenzetto, P.; Zacchia, F.; Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P.; Mitteau, R.; Eaton, R.; Raffray, R.; Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T.

    2015-01-01

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m"2). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m"2 show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m"2 is described in detail.

  9. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    Energy Technology Data Exchange (ETDEWEB)

    Banetta, S., E-mail: stefano.banetta@f4e.europa.eu [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Bellin, B.; Lorenzetto, P.; Zacchia, F. [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P. [AREVA NP PTCMI-F, Centre Technique, Fusion, 71200 Le Creusot (France); Mitteau, R.; Eaton, R.; Raffray, R. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T. [Forschungszentrum Jülich, Institute of Energy and Climate Research, Jülich (Germany)

    2015-10-15

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m{sup 2}). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m{sup 2} show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m{sup 2} is described in detail.

  10. Preliminary Results from Second Phase Sea Testing of the Wave Dragon Prototype Wave Energy Converter

    DEFF Research Database (Denmark)

    Soerensen, Hans Chr.; Tedd, James; Friis-Madsen, Erik

    2006-01-01

    In March 2006 the prototype Wave Dragon has been redeployed to a more energetic site in Nissum Bredning an inland sea in Western Denmark. This has followed a period of renovation of many aspects of the device which have resulted in 20% higher energy output. This paper describes the preliminary...

  11. Application of Rapid Prototyping Methods to High-Speed Wind Tunnel Testing

    Science.gov (United States)

    Springer, A. M.

    1998-01-01

    This study was undertaken in MSFC's 14-Inch Trisonic Wind Tunnel to determine if rapid prototyping methods could be used in the design and manufacturing of high speed wind tunnel models in direct testing applications, and if these methods would reduce model design/fabrication time and cost while providing models of high enough fidelity to provide adequate aerodynamic data, and of sufficient strength to survive the test environment. Rapid prototyping methods utilized to construct wind tunnel models in a wing-body-tail configuration were: fused deposition method using both ABS plastic and PEEK as building materials, stereolithography using the photopolymer SL-5170, selective laser sintering using glass reinforced nylon, and laminated object manufacturing using plastic reinforced with glass and 'paper'. This study revealed good agreement between the SLA model, the metal model with an FDM-ABS nose, an SLA nose, and the metal model for most operating conditions, while the FDM-ABS data diverged at higher loading conditions. Data from the initial SLS model showed poor agreement due to problems in post-processing, resulting in a different configuration. A second SLS model was tested and showed relatively good agreement. It can be concluded that rapid prototyping models show promise in preliminary aerodynamic development studies at subsonic, transonic, and supersonic speeds.

  12. Results from tests of the Delphi TPC prototype

    International Nuclear Information System (INIS)

    Vilanova, D.

    1985-01-01

    Results from beam tests of a half-scale sector of the Delphi TPC are presented. The spatial resolution is slightly higher than predicted by Monte Carlo simulations, corresponding to an average value of about 300 μm. (orig.)

  13. A beam test of prototype time projection chamber using micro ...

    Indian Academy of Sciences (India)

    High Energy Accelerator Organization (KEK), Tsukuba 305-0801, Japan. E-mail: makoto.kobayashi.exp@kek.jp. Abstract. We conducted a series of beam tests of prototype TPCs for the international linear collider (ILC) experiment, equipped with an MWPC, a MicroMEGAS, or GEMs as a readout device. The prototype ...

  14. Test of long scintillating counter prototypes for CDF-II

    International Nuclear Information System (INIS)

    Budagov, Yu.; Chirikov-Zorin, I.; Pukhov, O.; Incagli, M.; Leone, S.; Menzione, A.; Pauletta, G.; Tokar, S.

    2000-01-01

    New type long (up to 3 m) scintillating counter prototypes, developed for CDF-II, have been tested. The shift-spectrum fiber ribbons were used for light collection, and modern ultra compact photomultipliers R5600 were used for light detection. The efficiency for m.i.p. was excellent for all prototypes. The light yield from the far end of the counters was found to be more than 20 photoelectrons

  15. First results of the Tore Supra ITER like ICRF antenna prototype

    International Nuclear Information System (INIS)

    Vulliez, K.; Bosia, G.; Bremond, S.; Agarici, G.; Beaumont, B.; Lombard, G.; Millon, L.; Mollard, P.; Volpe, D.

    2005-01-01

    The project of an ITER-like (IL) ion cyclotron (IC) prototype antenna was initiated in mid 2002 in Cadarache, to assess the operational characteristics of the IL scheme in a Tore Supra (TS)-sized array. The prototype was developed by modifying an existing Tore Supra resonant double loop (RDL) antenna. This strategy, chosen to reduce cost and manufacturing time, allowed the completion of the array construction at the end of 2003. The array was installed on TS in January 2004, at the beginning of the new experimental campaign. After a few comments on the design, the paper reports results on low-power characterisation, high-power commissioning and preliminary tests on TS plasmas, prior to the array dis-assembly for inspection

  16. PhoneSat: Ground Testing of a Phone-Based Prototype Bus

    Science.gov (United States)

    Felix, Carmen; Howard, Benjamin; Reyes, Matthew; Snarskiy, Fedor; Hickman, Ryan; Boshuizen, Christopher; Marshall, William

    2010-01-01

    Most of the key capabilities that are requisite of a satellite bus are housed in today's smart phones. PhoneSat refers to an initiative to build a ground-based prototype vehicle that could all the basic functionality of a satellite, including attitude control, using a smart Phone as its central hardware. All components used were also low cost Commercial off the Shelf (COTS). In summer 2009, an initial prototype was created using the LEGO Mindstorm toolkit demonstrating simple attitude control. Here we report on a follow up initiative to design, build and test a vehicle based on the Google s smart phone Nexus One. The report includes results from initial thermal-vacuum chamber tests and low altitude sub-orbital rocket flights which show that, at least for short durations, the Nexus One phone is able to withstand key aspects of the space environment without failure. We compare the sensor data from the Phone's accelerometers and magnetometers with that of an external microelectronic inertial measurement unit.

  17. Using three-dimensional rapid prototyping in the design and development of orthopaedic screws in standardised pull-out tests.

    Science.gov (United States)

    Leslie, Laura Jane; Connolly, Ashley; Swadener, John G; Junaid, Sarah; Theivendran, Kanthan; Deshmukh, Subodh C

    2018-05-01

    The majority of orthopaedic screws are designed, tested and manufactured by existing orthopaedics companies and are predominantly developed with healthy bone in mind. The timescales and costs involved in the development of a new screw design, for example, for osteoporotic bone, are high. In this study, standard wood screws were used to analyse the concept of using three-dimensional printing, or rapid prototyping, as a viable stage of development in the design of a new bone screw. Six wood screws were reverse engineered and printed in polymeric material using stereolithography. Three of the designs were also printed in Ti6Al4V using direct metal laser sintering; however, these were not of sufficient quality to test further. Both the original metal screws (metal) and polymeric rapid prototyping screws were then tested using standard pull-out tests from low-density polyurethane blocks (Sawbones). Results showed the highest pull-out strengths for screws with the longest thread length and the smallest inner diameter. Of the six screw designs tested, five showed no more than a 17% variance between the metal and rapid prototyping results. A similar pattern of results was shown between the screw designs for both the metal and rapid prototyping screws in five of the six cases. While not producing fully comparable pull-out results to orthopaedic screws, the results from this study do provide evidence of the potential usefulness and cost-effectiveness of rapid prototyping in the early stages of design and testing of orthopaedic screws.

  18. Norcal Prototype LNG Truck Fleet: Final Results

    Energy Technology Data Exchange (ETDEWEB)

    2004-07-01

    U.S. DOE and National Renewable Energy Laboratory evaluated Norcal Waste Systems liquefied natural gas (LNG) waste transfer trucks. Trucks had prototype Cummins Westport ISXG engines. Report gives final evaluation results.

  19. Facility for the testing of the TFTR prototype neutral beam injector

    Energy Technology Data Exchange (ETDEWEB)

    Haughian, J.M.

    1977-07-01

    The design of the prototype neutral beam injection system for TFTR is nearing completion at the Lawrence Livermore Laboratory. This paper describes some of the features of the facility at the Lawrence Berkeley Laboratory where this prototype will be assembled and tested.

  20. Facility for the testing of the TFTR prototype neutral beam injector

    International Nuclear Information System (INIS)

    Haughian, J.M.

    1977-07-01

    The design of the prototype neutral beam injection system for TFTR is nearing completion at the Lawrence Livermore Laboratory. This paper describes some of the features of the facility at the Lawrence Berkeley Laboratory where this prototype will be assembled and tested

  1. Development and prototype testing of MgCl 2 /graphite foam latent heat thermal energy storage system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Dileep; Yu, Wenhua; Zhao, Weihuan; Kim, Taeil; France, David M.; Smith, Roger K.

    2018-01-01

    Composites of graphite foam infiltrated with a magnesium chloride phase-change material have been developed as high-temperature thermal energy storage media for concentrated solar power applications. This storage medium provides a high thermal energy storage density, a narrow operating temperature range, and excellent heat transfer characteristics. In this study, experimental investigations were conducted on laboratory-scale prototypes with magnesium chloride/graphite foam composite as the latent heat thermal energy storage system. Prototypes were designed and built to monitor the melt front movement during the charging/discharging tests. A test loop was built to ensure the charging/discharging of the prototypes at temperatures > 700 degrees C. Repeated thermal cycling experiments were carried out on the fabricated prototypes, and the experimental temperature profiles were compared to the predicted results from numerical simulations using COMSOL Multiphysics software. Experimental results were found to be in good agreement with the simulations to validate the thermal models.

  2. Window prototypes during the project

    DEFF Research Database (Denmark)

    Schultz, Jørgen Munthe

    1996-01-01

    The conditions for the PASSYS test and the results of the measurements on one of the aerogel window prototypes are described.......The conditions for the PASSYS test and the results of the measurements on one of the aerogel window prototypes are described....

  3. Development of a permanently controllable rotating biopsy device. Pt. I. Theoretical considerations and in-vitro results for five different prototypes

    International Nuclear Information System (INIS)

    Schaefer, Philipp Jost; Jahnke, T.; Andres, H.; Heller, M.; Schaefer, F.K.; Hedderich, J.

    2009-01-01

    Purpose: to develop different prototypes of permanently controllable rotating biopsy devices with determination of the most efficient prototype in biopsies in bovine myocardium. Materials and Methods: Five different prototypes of 18-gauge rotating biopsy devices were designed and constructed, four (1-4) with various drill-like cutting edges and one (5) cannula type with a lancet-like helically bent cutting edge. Using bovine myocardium as the biopsy tissue, n = 100 specimens per prototype were obtained, and a quantitative analysis including tissue fragmentation, length in mm and weight in mg was carried out. For statistical analysis, the chi-square test for tissue fragmentation and Kruskal-Wallis test for the parameters length and weight were calculated. Results: prototype 5 showed the highest rate of extraction of one-fragment specimens in n=66 cases and the lowest rate of failure to obtain tissue in n=11 cases. The mean length/weight were 4.15 mm/3.91 mg for prototype 1, 1.80 mm/1.66 mg for prototype 2, 4.61 mm/3.28 mg for prototype 3, 5.20 mm/3.74 mg for prototype 4, and 9.57 mm/6.97 mg for prototype 5. In all three categories, prototype 5 was significantly superior to the prototypes 1-4 with p < 0.001. Conclusion: the cannula type with a lancet-like helically bent cutting edge proved to be the most efficient prototype and may now be tested competitively against established automated biopsy devices in vitro. (orig.)

  4. Design manufacturing and thermo-mechanical testing of a relevant size mono block divertor prototype

    International Nuclear Information System (INIS)

    Cardella, A.; Vieider, G.; Di Pietro, E.; Orsini, A.; Febvre, M.; Guerreschi, U.; Reheis, N.; Bruno, L.

    1994-01-01

    Following a technological development of joining techniques between carbon fibre composite tiles and metallic tubes, and the manufacturing and testing of small size actively cooled mock-ups, a relevant size divertor prototype has been designed, manufactured and tested. The prototype consisted of a series of metallic tubes surrounded by CFC tiles, cooling collectors and a supporting system representative of a divertor dump plate for high power reactors. The tubes have been preliminary tested at the CEA 200 kW electron beam facility with uniform fluxes up to 5 MW/m 2 to select the best five tubes, which together with a sixth non tested tube have been then assembled to form the prototype. This has been tested at the JET high power neutral beam injector test facility. After screening tests the prototype has been subjected to thermal cycling at more than 15 MW/m 2 . (author) 12 refs.; 4 figs

  5. How Rapid is Rapid Prototyping? Analysis of ESPADON Programme Results

    Directory of Open Access Journals (Sweden)

    Ian D. Alston

    2003-05-01

    Full Text Available New methodologies, engineering processes, and support environments are beginning to emerge for embedded signal processing systems. The main objectives are to enable defence industry to field state-of-the-art products in less time and with lower costs, including retrofits and upgrades, based predominately on commercial off the shelf (COTS components and the model-year concept. One of the cornerstones of the new methodologies is the concept of rapid prototyping. This is the ability to rapidly and seamlessly move from functional design to the architectural design to the implementation, through automatic code generation tools, onto real-time COTS test beds. In this paper, we try to quantify the term “rapid” and provide results, the metrics, from two independent benchmarks, a radar and sonar beamforming application subset. The metrics show that the rapid prototyping process may be sixteen times faster than a conventional process.

  6. The test facility for the short prototypes of the LHC superconducting magnets

    International Nuclear Information System (INIS)

    Delsolaro, W. Venturini; Arn, A.; Bottura, L.; Giloux, C.; Mompo, R.; Siemko, A.; Walckiers, L.

    2002-01-01

    The LHC development program relies on cryogenic tests of prototype and model magnets. This vigorous program is pursued in a dedicated test facility based on several vertical cryostats working at superfluid helium temperatures. The performance of the facility is detailed. Goals and test equipment for currently performed studies are reviewed: quench analysis and magnet protection studies, measurement of the field quality, test of ancillary electrical equipment like diodes and busbars. The paper covers the equipment available for tests of prototypes and some special series of LHC magnets to come

  7. The test facility for the short prototypes of the LHC superconducting magnets

    Science.gov (United States)

    Delsolaro, W. Venturini; Arn, A.; Bottura, L.; Giloux, C.; Mompo, R.; Siemko, A.; Walckiers, L.

    2002-05-01

    The LHC development program relies on cryogenic tests of prototype and model magnets. This vigorous program is pursued in a dedicated test facility based on several vertical cryostats working at superfluid helium temperatures. The performance of the facility is detailed. Goals and test equipment for currently performed studies are reviewed: quench analysis and magnet protection studies, measurement of the field quality, test of ancillary electrical equipment like diodes and busbars. The paper covers the equipment available for tests of prototypes and some special series of LHC magnets to come.

  8. Development and Testing of a Smartphone Application Prototype for Oral Health Promotion.

    Science.gov (United States)

    Nolen, Sara L; Giblin-Scanlon, Lori J; Boyd, Linda D; Rainchuso, Lori

    2018-04-01

    Purpose: The purpose of this study was to develop and test a smartphone application (app) prototype, ToothSense, as an oral health promotion tool for the prevention of Early Childhood Caries (ECC) based on the Theory of Planned Behavior (TPB). Methods: A quantitative and qualitative design process based on the TPB was used for the app development in the first phase of the study. A behavioral intervention technologic model was used to document the app features design, accounting for Doshi's intervention strategies for the TPB. Beta-testing of the app was hosted via an online software program. Testers were presented with a series of tasks and prompts followed by a 5-point Likert-scale questionnaire that quantitatively measured perceptions of the app's interactive design based on Jakob Nielsen's principles and behavioral strategies. A Net Promotor Score was calculated to determine the tester's likelihood to recommend the app prototype. Audio and video aspects of the app were qualitatively measured using a template approach. Results: Beta testers agreed the app met the majority of the five usability statements. The Net Promotor Score indicated a likelihood to recommend the app prototype. Thematic analyses revealed the following themes: interface design, navigation, terminology, information, and oral health promotion. Conclusion: Beta testing results from this study provided health promotion project design information for the prevention of ECC using the TPB and highlighted the importance and usability of smartphone app for oral health promotion. Copyright © 2018 The American Dental Hygienists’ Association.

  9. Durability Tests of Ball Valve Prototype with Flowmeter Operation

    Science.gov (United States)

    Rogula, J.; Romanik, G.

    2018-02-01

    The results of the investigation of the prototypical ball valve are presented in this article. The innovation of the tested valve is a ball with a built-in measuring orifice. The valve has been subjected to durability tests. Leakage under three temperatures: ambient, -30°C and +100°C was analyzed. Sealing elements of the valve were tested for roughness and deviation of shape before and after the cycles of operation. Ball valve operation means cycles of open/close. It was planned to perform 1000 cycles at each temperature condition accordingly. Tests of the valve were performed under gas pressure equal to 10 MPa. The research was carried out under the Operational Program "Intelligent Development" (POIR 01.01.01-00-0013 / 15 "Development of devices for measurement of media flow on industrial trunk-lines".

  10. Prototyping and testing of a fully autonomous road construction beacon, the iCone.

    Science.gov (United States)

    2010-04-01

    A revolutionary portable traffic monitoring device is developed, extensively prototyped and thoroughly tested throughout the State of New York as well as several other states. The resulting device, trademarked as the iCone, simplifies the process o...

  11. Laboratory test of an APS-based sun sensor prototype

    Science.gov (United States)

    Rufino, Giancarlo; Perrotta, Alessandro; Grassi, Michele

    2017-11-01

    This paper deals with design and prototype development of an Active Pixel Sensor - based miniature sun sensor and a laboratory facility for its indoor test and calibration. The miniature sun sensor is described and the laboratory test facility is presented in detail. The major focus of the paper is on tests and calibration of the sensor. Two different calibration functions have been adopted. They are based, respectively, on a geometrical model, which has required least-squares optimisation of system physical parameters estimates, and on neural networks. Calibration results are presented for the above solutions, showing that accuracy in the order of 0.01° has been achieved. Neural calibration functions have attained better performance thanks to their intrinsic auto-adaptive structure.

  12. Detailed design, fabrication and testing of an engineering prototype compensated pulsed alternator. Final report

    International Nuclear Information System (INIS)

    Bird, W.L. Jr.; Woodson, H.H.

    1980-03-01

    The design, fabrication, and test results of a prototype compensated pulsed alternator are discussed. The prototype compulsator is a vertical shaft single phase alternator with a rotating armature and salient pole stator. The machine is designed for low rep rate pulsed duty and is sized to drive a modified 10 cm Beta amplifier. The load consists of sixteen 15 mm x 20 mm x 112 cm long xenon flashlamps connected in parallel. The prototype compulsator generates an open circuit voltage of 6 kV, 180 Hz, at a maximum design speed of 5400 rpm. At maximum speed, the inertial energy stored in the compulsator rotor is 3.4 megajoules

  13. Biointrusion test plan for the Permanent Isolation Surface Barrier Prototype

    International Nuclear Information System (INIS)

    Link, S.O.; Cadwell, L.L.; Brandt, C.A.; Downs, J.L.; Rossi, R.E.; Gee, G.W.

    1994-04-01

    This document provides a testing and monitoring plan for the biological component of the prototype barrier slated for construction at the Hanford Site. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system. It is designed to permanently isolate waste from the biosphere. The features of the barrier include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, covered with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype barrier over the next several years to evaluate barrier performance under extreme climatic conditions. Plants and animals will play a significant role in the hydrologic and water and wind erosion characteristics of the prototype barrier. Studies on the biological component of the prototype barrier will include work on the initial revegetation of the surface, continued monitoring of the developing plant community, rooting depth and dispersion in the context of biointrusion potential, the role of plants in the hydrology of the surface and toe regions of the barrier, the role of plants in stabilizing the surface against water and wind erosion, and the role of burrowing animals in the hydrology and water and wind erosion of the barrier

  14. High-Temperature Structural Analysis of a Small-Scale PHE Prototype under the Test Condition of a Small-Scale Gas Loop

    International Nuclear Information System (INIS)

    Song, K.; Hong, S.; Park, H.

    2012-01-01

    A process heat exchanger (PHE) is a key component for transferring the high-temperature heat generated from a very high-temperature reactor (VHTR) to a chemical reaction for the massive production of hydrogen. The Korea Atomic Energy Research Institute has designed and assembled a small-scale nitrogen gas loop for a performance test on VHTR components and has manufactured a small-scale PHE prototype made of Hastelloy-X alloy. A performance test on the PHE prototype is underway in the gas loop, where different kinds of pipelines connecting to the PHE prototype are tested for reducing the thermal stress under the expansion of the PHE prototype. In this study, to evaluate the high-temperature structural integrity of the PHE prototype under the test condition of the gas loop, a realistic and effective boundary condition imposing the stiffness of the pipelines connected to the PHE prototype was suggested. An equivalent spring stiffness to reduce the thermal stress under the expansion of the PHE prototype was computed from the bending deformation and expansion of the pipelines connected to the PHE. A structural analysis on the PHE prototype was also carried out by imposing the suggested boundary condition. As a result of the analysis, the structural integrity of the PHE prototype seems to be maintained under the test condition of the gas loop.

  15. Construction and bench testing of a prototype rotatable collimator for the LHC

    CERN Document Server

    Markiewicz, T; Keller, L; Aberle, O; Bertarelli, A; Gradassi, P; Marsili, A; Redaelli, S; Rossi, A; Salvachua, B; Valentino, G

    2014-01-01

    A second generation prototype rotatable collimator has been fabricated at SLAC and delivered to CERN for further vacuum, metrology, function and impedance tests. The design features two cylindrical Glidcop jaws designed to each absorb 12 kW of beam in steady state and up to 60 kW in transitory beam loss with no damage and minimal thermal distortion [1]. The design is motivated by the use of a radiation resistant high Z low impedance readily available material. A vacuum rotation mechanism using the standard LHC collimation jaw positioning motor system allows each jaw to be rotated to present a new 2 cm high surface to the beam if the jaw surface were to be damaged by multiple full intensity beam bunch impacts in a asynchronous beam abort. Design modifications to improve on the first generation prototype, pre-delivery functional tests performed at SLAC and post-delivery test results at CERN are presented.

  16. OTEC riser cable model and prototype testing

    Science.gov (United States)

    Kurt, J. P.; Schultz, J. A.; Roblee, L. H. S.

    1981-12-01

    Two different OTEC riser cables have been developed to span the distance between a floating OTEC power plant and the ocean floor. The major design concerns for a riser cable in the dynamic OTEC environment are fatigue, corrosion, and electrical/mechanical aging of the cable components. The basic properties of the cable materials were studied through tests on model cables and on samples of cable materials. Full-scale prototype cables were manufactured and were tested to measure their electrical and mechanical properties and performance. The full-scale testing was culminated by the electrical/mechanical fatigue test, which exposes full-scale cables to simultaneous tension, bending and electrical loads, all in a natural seawater environment.

  17. ISR Superconducting Quadrupole Prototype:preparing the first test

    CERN Multimedia

    CERN PhotoLab

    1976-01-01

    The photo shows the first prototype quadrupole (still with an adjustable stainless steel shrinking cylinder) being lifted to be inserted in a vertical cryostat for testing. It attained the design field gradient without any quench.The persons are Pierre Rey and Michel Bouvier. See also 7702690X.

  18. Low power microwave tests on RF gun prototype of the Iranian Light Source Facility

    Directory of Open Access Journals (Sweden)

    A Sadeghipanah

    2017-08-01

    Full Text Available In this paper, we introduce RF electron gun of Iranian Light Source Facility (ILSF pre-injection system. Design, fabrication and low-power microwave tests results of the prototype RF electron gun have been described in detail. This paper also explains the tuning procedure of the prototype RF electron gun to the desired resonant frequency. The outcomes of this project brighten the path to the fabrication of the RF electron gun by the local industries  

  19. Test result of 5 GHz, 500 kW CW prototype klystron for KSTAR LHCD system

    Energy Technology Data Exchange (ETDEWEB)

    Do, H., E-mail: heejindo@nfri.re.kr [Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of); Park, S. [Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of); Jeong, J.H.; Bae, Y.S.; Yang, H.L. [National Fusion Research Institute, Daejeon 350-333 (Korea, Republic of); Delpech, L.; Magne, R.; Hoang, G.T. [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Park, H.; Cho, M.H.; Namkung, W. [Pohang University of Science and Technology, Pohang 790-784 (Korea, Republic of)

    2011-10-15

    A 5 GHz LHCD system is being designed for current drive and profile modification necessary for AT mode and steady-state operation of the KSTAR tokamak. A prototype 500 kW CW klystron operating at 5 GHz was developed for the steady-state RF source. In this klystron, a multi-cell cavity is introduced to reduce cavity voltage and ohmic power loss. The klystron is designed with a triode system for optimization of gain, efficiency and beam control. The high voltage for the cathode is turned by using a thyristor switching system at the low voltage transformer unit. For anode voltage control, a mod-anode voltage divider system is used which utilize the parallel-circuit of the FET switch and Zener diodes. The RF output power of the klystron was 300 kW for 800 s and 450 kW for 20 s. The maximal temperature at collector top surface was 83 deg. C and power loss at the tube body did not exceed 10 kW, the interlock level for the protection of the klystron. Detailed results of the klystron system test and commissioning are presented.

  20. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  1. Software Prototyping

    Science.gov (United States)

    Del Fiol, Guilherme; Hanseler, Haley; Crouch, Barbara Insley; Cummins, Mollie R.

    2016-01-01

    Summary Background Health information exchange (HIE) between Poison Control Centers (PCCs) and Emergency Departments (EDs) could improve care of poisoned patients. However, PCC information systems are not designed to facilitate HIE with EDs; therefore, we are developing specialized software to support HIE within the normal workflow of the PCC using user-centered design and rapid prototyping. Objective To describe the design of an HIE dashboard and the refinement of user requirements through rapid prototyping. Methods Using previously elicited user requirements, we designed low-fidelity sketches of designs on paper with iterative refinement. Next, we designed an interactive high-fidelity prototype and conducted scenario-based usability tests with end users. Users were asked to think aloud while accomplishing tasks related to a case vignette. After testing, the users provided feedback and evaluated the prototype using the System Usability Scale (SUS). Results Survey results from three users provided useful feedback that was then incorporated into the design. After achieving a stable design, we used the prototype itself as the specification for development of the actual software. Benefits of prototyping included having 1) subject-matter experts heavily involved with the design; 2) flexibility to make rapid changes, 3) the ability to minimize software development efforts early in the design stage; 4) rapid finalization of requirements; 5) early visualization of designs; 6) and a powerful vehicle for communication of the design to the programmers. Challenges included 1) time and effort to develop the prototypes and case scenarios; 2) no simulation of system performance; 3) not having all proposed functionality available in the final product; and 4) missing needed data elements in the PCC information system. PMID:27081404

  2. Accelerator Tests of the Prototype Energetic Heavy Ion Sensor (EHIS) for GOES-R

    Science.gov (United States)

    Connell, J. J.; Lopate, C.; McKibben, R. B.

    2010-12-01

    The Energetic Heavy Ion Sensor (EHIS) is part of the Space Environmental In-Situ Suite (SEISS) for the Geostationary Operational Environment Satellite series R (GOES-R) program. It will measure energetic protons from 10-200 MeV and ions through nickel (Z=28) with similar penetrating power. By use of an Angle Detecting Inclined Sensor (ADIS) system, EHIS achieves single element resolution with extensive on-board event processing. A prototype or "brass-board" instrument, fully functional but not intended for environmental testing, has been completed. In November of 2009, we exposed the prototype to protons at Massachusetts General Hospital (MGH) and in March of 2010, we exposed it to Ni primary and fragment beams at the National Superconducting Cyclotron Laboratory's (NSCL) Coupled Cyclotron Facility (CCF). In both cases, the instrument was rotated over a range of angles and a moving degrader spread the energy from full beam energy to zero energy. We will present results of these tests. These show an angular resolution for the prototype which results in a one sigma charge resolution of ~0.25 e at Ni. The prototype also demonstrated the capability for calculating the charge of 2500 events per second with its internal processor, accumulating those events in on-board charge histograms, and thus providing unprecedented statistics in high flux conditions. The EHIS represents a major advance in capabilities for operational space weather instruments while also providing data quality suitable for scientific research. The EHIS instrument development project was funded by NASA under contract NNG06HX01C.

  3. The PIAA Coronagraph Prototype: First Laboratory Results.

    Science.gov (United States)

    Pluzhnik, Eugene; Guyon, O.; Colley, S.; Gallet, B.; Ridgway, S.; Woodruff, R.; Tanaka, S.; Warren, M.

    2006-12-01

    The phase-induced amplitude apodization (PIAA) coronagraph combines the main advantages of classical pupil apodization with high throughput ( 100%), high angular resolution ( 2λ/D) and low chromaticity. These advantages can allow direct imaging of nearby extrasolar planets with a 4-meter telescope. The PIAA coronagraph laboratory prototype has been successfully manufactured and starts to operate at the Subary Telescope facility. We present here our first laboratory results with this prototype where we have achieved 2x10-6 contrast within 2 λ/D. We also discuss the main constrains limiting the contrast and describe our future efforts. This work was carried out under JPL contract numbers 1254445 and 1257767 for Development of Technologies for the Terrestrial Planet Finder Mission, with the support and hospitality of the National Astronomical Observatory of Japan.

  4. The Cherenkov correlated timing detector: beam test results from quartz and acrylic bars

    International Nuclear Information System (INIS)

    Kichimi, H.; Sugaya, Y.; Yamaguchi, H.; Yoshimura, Y.; Kanda, S.; Olsen, S.; Ueno, K.; Varner, G.; Bergfeld, T.; Bialek, J.; Lorenc, J.; Palmer, M.; Rudnick, G.; Selen, M.; Auran, T.; Boyer, V.; Honscheid, K.; Tamura, N.; Yoshimura, K.; Lu, C.; Marlow, D.; Mindas, C.; Prebys, E.; Asai, M.; Kimura, A.; Hayashi, S.

    1996-01-01

    Several prototypes of a Cherenkov correlated timing (CCT) detector have been tested at the KEK-PS test beam line. We describe the results for Cherenkov light yields and timing characteristics from quartz and acrylic bar prototypes. A Cherenkov angle resolution is found to be 15 mrad at a propagation distance of 100 cm with a 2 cm thick quartz bar prototype. (orig.)

  5. Test results of sodium-water reaction testing in near prototypical LMR steam generator

    International Nuclear Information System (INIS)

    Boardman, C.E.; Hui, M.; Neely, H.H.

    1990-01-01

    An extensive test program has been performed in the United States to investigate the effects of large sodium-water reaction events in LMFBR steam generators. Tests were conducted in the Large Leak Test Rig (LLTR) located at the Energy Technology Engineering Center (ETEC). The program was divided into two phases, Series I and Series II, for the purpose of satisfying near-term and long-term needs. Series II was further subdivided into large and intermediate leak tests. This paper will emphasize the Series II intermediate leak tests and resulting conclusions for steam generator design and operation. 11 figs, 2 tabs

  6. Project, fabrication, assembly and tests of different prototypes for CPS compound parabolic solar collectors; Projeto, fabricacao, montagem e testes de diferentes prototipos de coletores solares parabolicos compostos CPCs

    Energy Technology Data Exchange (ETDEWEB)

    Neto, Jose H.M. [Centro Federal de Educacao Tecnologica de Minas Gerais (CEFET), Belo Horizonte, MG (Brazil). Dept. de Engenharia Mecanica]. E-mail: henrique@daem.des.cefemg.br

    2000-07-01

    This work presents the results of the experiment involving the design, fabrication, assembly and tests of composite parabolic solar collectors prototypes with acceptance half-angles of 3 deg C, 6.5 deg C, 11 deg C, 14 deg C and 19.5 deg C of the tube type absorber and 14 deg C rectangular absorber. Field test were performed on all the prototypes for determination of thermal efficiency, time constants and optical efficiencies represented by the modified incidence angles. Tests were performed for the determination of the heat transfer global coefficients on each prototype. (author)

  7. Development and test of a prototype for the PANDA barrel DIRC detector at FAIR

    Energy Technology Data Exchange (ETDEWEB)

    Kalicy, Grzegorz

    2014-07-01

    The PANDA experiment at FAIR will perform world class physics studies using high-intensity cooled antiproton beams with momenta between 1.5 and 15 GeV/c. A rich physics program requires very good particle identification (PID). Charged hadron PID for the barrel section of the target spectrometer has to cover the angular range of 22-140 and separate pions from kaons for momenta up to 3.5 GeV/c with a separation power of at least 3 standard deviations. The system that will provide it has to be thin and operate in a strong magnetic field. A ring imaging Cherenkov detector using the DIRC principle meets those requirements. The design of the PANDA Barrel DIRC is based on the successful BABAR DIRC counter with several important changes to improve the performance and optimize the costs. The design options are being studied in detailed Monte Carlo simulation, and implemented in increasingly complex system prototypes and tested in particle beams. Before building the full system prototypes the radiator bars and lenses are measured on the test benches. The performance of the DIRC prototype was quantified in terms of the single photon Cherenkov angle resolution and the photon yield. Results for two full system prototypes will be presented. The prototype in 2011 aimed at investigating the full size expansion volume. It was found that the resolution for this configuration is at the level of in good agreement with ray tracing simulation results. A more complex prototype, tested in 2012, provided the first experience with a compact fused silica prism expansion volume, a wide radiator plate, and several advanced lens options for the focusing system. The performance of the baseline configuration of the prototype with a standard lens and an air gap met the requirements for the PANDA PID for most of the polar angle range but failed at polar angles around 90 due to photon loss at the air gap. Measurements with a prototype high-refractive index compound lens without an air gap at a polar

  8. Development and test of a prototype for the PANDA barrel DIRC detector at FAIR

    International Nuclear Information System (INIS)

    Kalicy, Grzegorz

    2014-01-01

    The PANDA experiment at FAIR will perform world class physics studies using high-intensity cooled antiproton beams with momenta between 1.5 and 15 GeV/c. A rich physics program requires very good particle identification (PID). Charged hadron PID for the barrel section of the target spectrometer has to cover the angular range of 22-140 and separate pions from kaons for momenta up to 3.5 GeV/c with a separation power of at least 3 standard deviations. The system that will provide it has to be thin and operate in a strong magnetic field. A ring imaging Cherenkov detector using the DIRC principle meets those requirements. The design of the PANDA Barrel DIRC is based on the successful BABAR DIRC counter with several important changes to improve the performance and optimize the costs. The design options are being studied in detailed Monte Carlo simulation, and implemented in increasingly complex system prototypes and tested in particle beams. Before building the full system prototypes the radiator bars and lenses are measured on the test benches. The performance of the DIRC prototype was quantified in terms of the single photon Cherenkov angle resolution and the photon yield. Results for two full system prototypes will be presented. The prototype in 2011 aimed at investigating the full size expansion volume. It was found that the resolution for this configuration is at the level of in good agreement with ray tracing simulation results. A more complex prototype, tested in 2012, provided the first experience with a compact fused silica prism expansion volume, a wide radiator plate, and several advanced lens options for the focusing system. The performance of the baseline configuration of the prototype with a standard lens and an air gap met the requirements for the PANDA PID for most of the polar angle range but failed at polar angles around 90 due to photon loss at the air gap. Measurements with a prototype high-refractive index compound lens without an air gap at a polar

  9. Prototype tests for the ALICE TRD

    International Nuclear Information System (INIS)

    Andronic, A.; Appelshaeuser, H.; Herrmann, N.; Mahmoud, T.; Schicker, R.; Stachel, J.; Wessels, J.; Windelband, B.; Xu, C.; Blume, C.; Braun-Munzinger, P.; Daues, H.; Devismes, A.; Finck, Ch.; Sedykh, S.; Simon, R. S.; Stelzer, H.; Bucher, D.; Lister, T.; Peitzmann, T.; Reygers, K.; Santo, R.; Winkelmann, O.; Catanescu, V.; Ciobanu, M.; Petrovici, M.; Blume, C.; Braun-Munzinger, P.; Daues, H.; Devismes, A.; Finck, Ch.; Sedykh, S.; Simon, R. S.; Stelzer, H.

    2001-01-01

    The ALICE Transition Radiation Detector (TRD) has been designed to improve the pion rejection capability of the ALICE detector by at least a factor of 100 for momenta above 2 GeV/c. To demonstrate that this goal is achievable, during the last year we have conducted prototype tests at the pion (with natural electron content) beam facility at GSI Darmstadt. A complete description of the experimental setup and of the results (including references) can be found in two previous papers by Andronic et al. Many types of radiators were tested, composed of foils, fibres and foams. Here we summarize the results concerning the pion rejection performance in case of a fibre (of 17 μm diameter) radiator, which was established to be the best candidate for the final radiator. To extract the pion rejection factor we have studied three different methods: i) truncated mean of integrated energy deposit, TMQ; ii) likelihood on integrated energy deposit, L-Q; iii) bidimensional likelihood on energy deposit and position of the largest cluster found in the drift region of the DC, L-QX. We present the pion efficiency (the inverse of the rejection factor) as function of electron efficiency (90% electron efficiency is the commonly used value) in case of fibre radiators for the momentum of 1 GeV/c. The truncated mean method, although it delivers sizeably worse identification, has the advantage of being very easy to use, being advantageous especially for an on-line identification. The bidimensional likelihood delivers the best rejection factor. In general, the three methods employed here give results in good agreement with earlier studies. By doubling the equivalent thickness of the radiator one gains a factor of about 2 in pion rejection power. However, it remains to be seen how the additional material will influence (by producing secondary particles) the performance of the TRD itself and of other ALICE sub-detectors. The pion efficiency at 90% electron efficiency as function of momentum is

  10. submitter Manufacture and Test of ITER 10-kA HTSCL Prototypes

    CERN Document Server

    Zhou, Tingzhi; Liu, Chenglian; Lu, Kun; Ran, Qingxiang; Song, Yuntao; Niu, Erwu; Bauer, Pierre; Devred, Arnaud; Lee, Seungje; Taylor, Thomas; Yang, Yifeng

    2016-01-01

    To carry current for the ITER correction coils, the 10-kA high-temperature superconducting current leads studied here are designed. Current leads provide the transition from 4.5-K low temperature to room temperature. This paper summarizes the major design features of the prototypes, which is followed by a discussion of the manufacturing and testing. The test results approved their excellent performance on low joint resistance and long loss-of-flow accident time. The overheating time, mass flow, and heat loads to 5-K ends also reached the expectation.

  11. Development and performance of prototype serologic and molecular tests for hepatitis delta infection.

    Science.gov (United States)

    Coller, Kelly E; Butler, Emily K; Luk, Ka-Cheung; Rodgers, Mary A; Cassidy, Michael; Gersch, Jeffrey; McNamara, Anne L; Kuhns, Mary C; Dawson, George J; Kaptue, Lazare; Bremer, Birgit; Wedemeyer, Heiner; Cloherty, Gavin A

    2018-02-01

    Worldwide, an estimated 5% of hepatitis B virus (HBV) infected people are coinfected with hepatitis delta virus (HDV). HDV infection leads to increased mortality over HBV mono-infection, yet HDV diagnostics are not widely available. Prototype molecular (RNA) and serologic (IgG) assays were developed for high-throughput testing on the Abbott m2000 and ARCHITECT systems, respectively. RNA detection was achieved through amplification of a ribozyme region target, with a limit of detection of 5 IU/ml. The prototype serology assay (IgG) was developed using peptides derived from HDV large antigen (HDAg), and linear epitopes were further identified by peptide scan. Specificity of an HBV negative population was 100% for both assays. A panel of 145 HBsAg positive samples from Cameroon with unknown HDV status was tested using both assays: 16 (11.0%) had detectable HDV RNA, and 23 (15.7%) were sero-positive including the 16 HDV RNA positive samples. Additionally, an archival serial bleed panel from an HDV superinfected chimpanzee was tested with both prototypes; data was consistent with historic testing data using a commercial total anti-Delta test. Overall, the two prototype assays provide sensitive and specific methods for HDV detection using high throughput automated platforms, allowing opportunity for improved diagnosis of HDV infected patients.

  12. Construction and testing of a large scale prototype of a silicon tungsten electromagnetic calorimeter for a future lepton collider

    International Nuclear Information System (INIS)

    Rouëné, Jérémy

    2013-01-01

    The CALICE collaboration is preparing large scale prototypes of highly granular calorimeters for detectors to be operated at a future linear electron positron collider. After several beam campaigns at DESY, CERN and FNAL, the CALICE collaboration has demonstrated the principle of highly granular electromagnetic calorimeters with a first prototype called physics prototype. The next prototype, called technological prototype, addresses the engineering challenges which come along with the realisation of highly granular calorimeters. This prototype will comprise 30 layers where each layer is composed of four 9×9 cm 2 silicon wafers. The front end electronics is integrated into the detector layers. The size of each pixel is 5×5 mm 2 . This prototype enters its construction phase. We present results of the first layers of the technological prototype obtained during beam test campaigns in spring and summer 2012. According to these results the signal over noise ratio of the detector exceeds the R and D goal of 10:1

  13. Prototype Testing of the Wave Energy Converter Wave Dragon

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter Bak; Friis-Madsen, Erik

    2004-01-01

    The Wave Dragon is an offshore wave energy converter of the overtopping type. It consists of two wave reflectors focusing the incoming waves towards a ramp, a reservoir for collecting the overtopping water and a number of hydro turbines for converting the pressure head into power. In the period...... from 1998 to 2001 extensive wave tank testing on a scale model was carried at Aalborg University. Then, a 57 x 27 m wide and 237 tonnes heavy (incl. ballast) prototype of the Wave Dragon, placed in Nissum Bredning, Denmark, was grid connected in May 2003 as the world's first offshore wave energy...... converter. The prototype is fully equipped with hydro turbines and automatic control systems, and is instrumented in order to monitor power production, wave climate, forces in mooring lines, stresses in the structure and movements of the Wave Dragon. During the last months, extensive testing has started...

  14. 10 CFR 32.103 - Schedule D-prototype tests for ice detection devices containing strontium-90.

    Science.gov (United States)

    2010-01-01

    ... water and the strontium-90 shall be considered leakage. (e) Observations. After each of the tests... 10 Energy 1 2010-01-01 2010-01-01 false Schedule D-prototype tests for ice detection devices... § 32.103 Schedule D—prototype tests for ice detection devices containing strontium-90. An applicant for...

  15. Test results and operational characteristics of prototype SSCL half cell

    International Nuclear Information System (INIS)

    McInturff, A.D.; Burgett, W.; Carter, H.

    1994-01-01

    The SSCL Accelerator System's String Test (ASST) has had several cool down, subsequent operational test series, and warm up cycles. The first cycle of these was rather limited in scope as mandated by Congress. The subsequent tests have been performed to obtain more complete information about parameters of, or operating experience with, the ensemble of magnets and spools when operating serially as in accelerator operations. The tests and procedures performed to date have emphasized cryogenic, mechanical, and electrical operations. These have included running, as well as upset conditions, i.e., superconducting to normal transition of the string (quench). This paper represents a summary of the operational test results and characteristics seen to date. A limited discussion will be included as to their implications with respect to a successful accelerator operation

  16. Investigating the role of implicit prototypes in the prototype willingness model.

    Science.gov (United States)

    Howell, Jennifer L; Ratliff, Kate A

    2017-06-01

    One useful theory to predict health behavior is the prototype-willingness model (PWM), which posits that people are more willing to engage in behavior to the extent that they have a positive view of the prototypical person who performs that behavior. The goal of the present research is to test whether adding an implicit measure of prototype favorability might improve explanatory power in the PWM. Two studies examined whether implicit prototype favorability uniquely predicted White women's intentions to engage in healthy sun behavior over the next 3-6 months, and their willingness to engage in risky sun behavior, should the opportunity arise. The results suggested that implicit prototype favorability, particularly implicit prototypes of those who engage in risky UV-related behaviors, uniquely predicted intentions to engage in healthy sun behavior and willingness to engage in risky sun behavior in the PWM.

  17. Control and Non-Payload Communications (CNPC) Prototype Radio Validation Flight Test Report

    Science.gov (United States)

    Shalkhauser, Kurt A.; Ishac, Joseph A.; Iannicca, Dennis C.; Bretmersky, Steven C.; Smith, Albert E.

    2017-01-01

    This report provides an overview and results from the unmanned aircraft (UA) Control and Non-Payload Communications (CNPC) Generation 5 prototype radio validation flight test campaign. The radios used in the test campaign were developed under cooperative agreement NNC11AA01A between the NASA Glenn Research Center and Rockwell Collins, Inc., of Cedar Rapids, Iowa. Measurement results are presented for flight tests over hilly terrain, open water, and urban landscape, utilizing radio sets installed into a NASA aircraft and ground stations. Signal strength and frame loss measurement data are analyzed relative to time and aircraft position, specifically addressing the impact of line-of-sight terrain obstructions on CNPC data flow. Both the radio and flight test system are described.

  18. Field test of a continuous-variable quantum key distribution prototype

    International Nuclear Information System (INIS)

    Fossier, S; Debuisschert, T; Diamanti, E; Villing, A; Tualle-Brouri, R; Grangier, P

    2009-01-01

    We have designed and realized a prototype that implements a continuous-variable quantum key distribution (QKD) protocol based on coherent states and reverse reconciliation. The system uses time and polarization multiplexing for optimal transmission and detection of the signal and phase reference, and employs sophisticated error-correction codes for reconciliation. The security of the system is guaranteed against general coherent eavesdropping attacks. The performance of the prototype was tested over preinstalled optical fibres as part of a quantum cryptography network combining different QKD technologies. The stable and automatic operation of the prototype over 57 h yielded an average secret key distribution rate of 8 kbit s -1 over a 3 dB loss optical fibre, including the key extraction process and all quantum and classical communication. This system is therefore ideal for securing communications in metropolitan size networks with high-speed requirements.

  19. Prototype spent-fuel canister design, analysis, and test

    International Nuclear Information System (INIS)

    Leisher, W.B.; Eakes, R.G.; Duffey, T.A.

    1982-03-01

    Sandia National Laboratories was asked by the US Energy Research and Development Administration (now US Department of Energy) to design the spent fuel shipping cask system for the Clinch River Breeder Reactor Plant (CRBRP). As a part of this task, a canister which holds liquid sodium and the spent fuel assembly was designed, analyzed, and tested. The canister body survived the regulatory Type-B 9.1-m (30-ft) drop test with no apparent leakage. However, the commercially available metal seal used in this design leaked after the tests. This report describes the design approach, analysis, and prototype canister testing. Recommended work for completing the design, when funding is available, is included

  20. Development in design of test infrastructure for ITER prototype cryoline test

    International Nuclear Information System (INIS)

    Ketan, Choukekar; Ritendra, Bhattacharya; Nitin, Shah; Muralidhara, Srinivasa; Himanshu, Kapoor; Pratik, Patel; Uday, Kumar; Biswanath, Sarkar

    2015-01-01

    The prototype cryoline (PTCL) for ITER is a representative cryoline from the complex network of all cryolines for the project. PTCL consist of six process pipes (of which four are operating at 4 K temperature level while two are operating at 80 K temperature level), thermal shield and outer vacuum jacket. PTCL will be tested for its thermal performance, mechanical integrity, leak tightness and functioning of components at cryogenic temperatures. The test infrastructure requirements for testing of PTCL have been identified based on the optimized test methodology. The best suited infrastructure option to test PTCL involves 80K system with helium compressor, test boxes, liquid helium Dewar, liquid nitrogen Dewar and interconnecting cryolines. Process study and various analyses have been performed to finalize the specifications of test infrastructure. The present work describes study on global thermo-hydraulic analysis of PTCL test infrastructure. Preliminary process simulation using the ASPEN HYSYS® has been performed to study the dynamic behavior of 80K system. (author)

  1. Technology for home dementia care: A prototype locating system put to the test.

    Science.gov (United States)

    Megges, Herlind; Freiesleben, Silka Dawn; Jankowski, Natalie; Haas, Brigitte; Peters, Oliver

    2017-09-01

    The user experience of persons with dementia and their primary caregivers with locating systems is not firmly established. Eighteen dyads used a prototype locating system during 4 weeks. Primary outcome measures were ratings of usability, and product functions and features. Secondary outcome measures were caregiver burden, perceived self-efficacy, frequency of use, and willingness to purchase the prototype. Changes in scores between baseline (T 1 ) and end of testing period (T 2 ) were compared by performing independent and dependent samples correlations and descriptive statistics. Seventeen dyads made up the final sample. Ratings of usability and product functions and features were fair, but usability ratings were significantly reduced after 4 weeks. Although the prototype was used infrequently by majority of the participants, most caregivers would be willing to purchase the prototype, with men more willing than women. No significant change in technological willingness, caregiver burden, or perceived self-efficacy was found between T 1 and T 2 . Perceived self-efficacy significantly negatively correlated with willingness to purchase the prototype after 4 weeks. Results highlight the importance of including end users in the research and development phase of locating systems to improve the user experience in home dementia care. Necessary indications for further research are carrying out randomized controlled trials with larger, more representative samples and developing innovative software and hardware solutions.

  2. Results of the first tests measurements using the prototype trigger-less data acquisition for the anti PANDA experiment

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, Milan; Gessler, Thomas; Kuehn, Wolfgang; Lange, Soeren; Spruck, Bjoern; Werner, Marcel [JLU Giessen (Germany); Collaboration: PANDA-Collaboration

    2015-07-01

    The anti PANDA detector will be a located at the high energy storage ring (HESR), at the facility for anti protons and ion research (FAIR) in Darmstadt, Germany. It will operate with a very high average interaction rate of about 20 MHz, in a free streaming mode without hardware trigger. Instead of triggering, data filtering will be performed by complete online event reconstruction with a highly parallelized farm of FPGAs as first level and on a farm of GPUs or PCs as a second level. The requirement is a background reduction by a factor of >1000. Parts of the anti PANDA detector will be pre-assembled and tested at the Forschungszentrum Juelich, before being transported to GSI at a later stage. A prototype trigger-less data acquisition (PTDAQ) will be used during this phase. The main component of the PTDAQ is the Compute Nodes (CN), a xTCA-compliant board based on a Virtex-5 FX70T FPGA, with a μTCA-formfactor. Synchronization is done via a Synchronization Of Data Acquisition (SODA) source. Parts of the functionality were tested in a setup using a 210 MeV electrons beam with a rate of 1 MHz at the Mainz Microtron. In this contribution, we present the first results of test measurements using the PTDAQ system.

  3. Start-up test of the prototype heavy water reactor 'FUGEN', (1)

    International Nuclear Information System (INIS)

    Ando, Hideki; Kawahara, Toshio

    1982-01-01

    The advanced thermal prototype reactor ''Fugen'' is a heavy water-moderated, boiling light water-cooled power reactor with electric output of 165 MW, which has been developed since 1966 as a national project. The start-up test was begun in March, 1978, being scheduled for about one year, and in March, 1979, it passed the final pre-use inspection and began the full scale operation. In this paper, the result of the start-up test of Fugen is reported. From the experience of the start-up test of Fugen, the following matters are important for the execution of start-up test. 1) Exact testing plan and work schedule, 2) the organization to perform the test, 3) the rapid evaluation of test results and the reflection to next testing plan, and 4) the reflection of test results to rated operation, regular inspection and so on. In the testing plan, the core characteristics peculiar to Fugen, and the features of heavy water-helium system, control system and other equipment were added to the contents of the start-up test of BWRs. The items of the start-up test were reactor physics test, plant equipment performance test, plant dynamic characteristic test, chemical and radiation measurement, and combined test. The organization to perform the start-up test, and the progress and the results of the test are reported. (Kako, I.)

  4. The Yucca Mountain Project prototype air-coring test, U12g tunnel, Nevada test site

    International Nuclear Information System (INIS)

    Ray, J.M.; Newsom, J.C.

    1994-12-01

    The Prototype Air-Coring Test was conducted at the Nevada Test Site (NTS) G-Tunnel facility to evaluate standard coring techniques, modified slightly for air circulation, for use in testing at a prospective nuclear waste repository at Yucca Mountain, Nevada. Air-coring technology allows sampling of subsurface lithology with minimal perturbation to ambient characteristic such as that required for exploratory holes near aquifers, environmental applications, and site characterization work. Two horizontal holes were cored, one 50 ft long and the other 150 ft long, in densely welded fractured tuff to simulate the difficult drilling conditions anticipated at Yucca Mountain. Drilling data from seven holes on three other prototype tests in nonwelded tuff were also collected for comparison. The test was used to establish preliminary standards of performance for drilling and dust collection equipment and to assess procedural efficiencies. The Longyear-38 drill achieved 97% recovery for HQ-size core (-2.5 in.), and the Atlas Copco dust collector (DCT-90) captured 1500 lb of fugitive dust in a mine environment with only minor modifications. Average hole production rates were 6-8 ft per 6-h shift in welded tuff and almost 20 ft per shift on deeper holes in nonwelded tuff. Lexan liners were successfully used to encapsulate core samples during the coring process and protect core properties effectively. The Prototype Air-Coring Test demonstrated that horizontal air coring in fractured welded tuff (to at least 150 ft) can be safely accomplished by proper selection, integration, and minor modification of standard drilling equipment, using appropriate procedures and engineering controls. The test also indicated that rig logistics, equipment, and methods need improvement before attempting a large-scale dry drilling program at Yucca Mountain

  5. Cryogenic distribution system for ITER proto-type cryoline test

    International Nuclear Information System (INIS)

    Bhattacharya, R.; Shah, N.; Badgujar, S.; Sarkar, B.

    2012-01-01

    Design validation for ITER cryoline will be carried out by proto-type test on cryoline. The major objectives of the test will be to ensure the mechanical integrity, reliability, thermal stress and heat load as well as checking of assembly and fabrication procedures. The cryogenics system has to satisfy the functional operating scenario of the cryoline. Cryoplant, distribution box (DB) including liquid helium (LHe) tank constitute the cryogenic system for the test. Conceptual system architecture is proposed with a commercially available refrigerator/liquefier and custom designed DB housing cold compressor, cold circulator as well as phase separator with sub-merged heat exchanger. System level optimization, mainly with DB and LHe tank with options, has been studied to minimize the cold power required for the system. Aspen HYSYS is used for the purpose of process simulation. The paper describes the system architecture and the optimized design as well as process simulation with associated results. (author)

  6. High Heat Flux Test of the ITER FW Semi-prototype Mockups

    International Nuclear Information System (INIS)

    Bae, Young Dug; Lee, Dong Won; Kim, Suk Kwon; Yoon, Jae Sung; Hong, Bong Guen

    2010-01-01

    As a procurement party of the ITER (International Thermonuclear Experimental Reactor) blanket project, we have to pass the qualification program which comprises two distinct phases; Phases 1 is about qualifying joining techniques, and phase 2 covers production scaled up component which is so called 'semi-prototype' and the enhanced heat flux qualification. We have constructed the FWQMs (First Wall Qualification Mockups) and already passed the qualification thermal fatigue tests organized by the IO (ITER Organization). The tests were performed at the EB-1200 in the USA and at the BESTH /JUDITH-2 in the EU. For the phase 2 qualification, the semi-prototype design will be provided by the IO. Even though the design has not fixed because the generic design of the first wall is not fixed, it shall comprise a minimum of 3 full length pairs of first wall fingers. We designed and fabricated two semi-prototype mockups which have a full length pair of first wall finger. The two mockups were designed to have different types of the cooling channels; one has a plain rectangular cross-section and the other has a hypervapotron type cooling channel. In order to compare the cooling capability of the two types, we performed high heat flux tests of the two mockups at the KoHLT-2

  7. Preliminary experimental results from a linear reciprocating magnetic refrigerator prototype

    International Nuclear Information System (INIS)

    Tagliafico, Luca Antonio; Scarpa, Federico; Valsuani, Federico; Tagliafico, Giulio

    2013-01-01

    A linear reciprocating magnetic refrigerator prototype was designed and built with the aid of an industrial partner. The refrigerator is based on the Active Magnetic Regenerative cycle, and exploits two regenerators working in parallel. The active material is Gadolinium in plates, 0.8 mm thick, for a total mass of 0.36 kg. The device is described and results about magnetic field and temperature span measurements are presented. The designed permanent magnet structure, based on an improved cross-type arrangement, generates a maximum magnetic field intensity of 1.55 T in air, over a gap of (13 × 50 × 100) mm 3 . The maximum temperature span achieved is 5.0 K, in a free run condition. -- Highlights: ► We give preliminary results from a linear reciprocating magnetic refrigerator prototype. ► The design is intended to process visualization and investigation. ► The prototype behavior gives us various suggestions to improve its general performance

  8. Electrical testing and performance evaluation of 1:1 prototype JET ELM control coils

    Energy Technology Data Exchange (ETDEWEB)

    Kanabar, Deven, E-mail: deven@ipr.res.in; Roy, Swati; Ghate, Mahesh; Raj, Piyush; Kundu, Ananya; Kumar, Nitish; Bhavsar, Dhaval; Panchal, Arun; Pradhan, Subrata, E-mail: pradhan@ipr.res.in

    2016-12-15

    Highlights: • An appropriate 1:1 prototype Small and Large ELM coils for JET have been successfully manufactured using indigenous technologies. • ELM coils have been tested extensively to verify and validated their performance with respect to operational requirement of JET. • The test results confirm and validate the electrical performance of ELM coils. - Abstract: Magnet Technology Development Division at Institute for Plasma research is engaged in extensive R & D for appropriate technologies towards manufacturing of Edge Localized Mode (ELM) magnets for Large Tokamak such as Joint European Torus (JET) as well as for Steady State Superconducting Tokamak (SST-1). Under this project, manufacturing of 1:1 prototype of Large and Small JET ELM control coils (CC) is completed incorporating indigenously developed manufacturing and insulation technologies. Performance evaluation of both the types of coil has been completed for its current carrying capability and insulation resistance as required by various operational scenarios of JET. Experimental setups, test procedures and measurements for electrical characterization of both type of ELM control coil has been discussed in this paper.

  9. Electrical testing and performance evaluation of 1:1 prototype JET ELM control coils

    International Nuclear Information System (INIS)

    Kanabar, Deven; Roy, Swati; Ghate, Mahesh; Raj, Piyush; Kundu, Ananya; Kumar, Nitish; Bhavsar, Dhaval; Panchal, Arun; Pradhan, Subrata

    2016-01-01

    Highlights: • An appropriate 1:1 prototype Small and Large ELM coils for JET have been successfully manufactured using indigenous technologies. • ELM coils have been tested extensively to verify and validated their performance with respect to operational requirement of JET. • The test results confirm and validate the electrical performance of ELM coils. - Abstract: Magnet Technology Development Division at Institute for Plasma research is engaged in extensive R & D for appropriate technologies towards manufacturing of Edge Localized Mode (ELM) magnets for Large Tokamak such as Joint European Torus (JET) as well as for Steady State Superconducting Tokamak (SST-1). Under this project, manufacturing of 1:1 prototype of Large and Small JET ELM control coils (CC) is completed incorporating indigenously developed manufacturing and insulation technologies. Performance evaluation of both the types of coil has been completed for its current carrying capability and insulation resistance as required by various operational scenarios of JET. Experimental setups, test procedures and measurements for electrical characterization of both type of ELM control coil has been discussed in this paper.

  10. Power Production Experience from Wave Dragon Prototype Testing in Nissum Bredning

    DEFF Research Database (Denmark)

    Frigaard, Peter; Kofoed, Jens Peter

    The first Wave Dragon prototype power production testing started May 2003 and ended temporarily primo 2005. In the mentioned period Wave Dragon was situated in a corner of Nissum Bredning with relative little amount of wave energy. Main purpose of the tests was demonstration of survivability...

  11. First irradiation test results of the ALICE SAMPA ASIC

    CERN Document Server

    Mahmood, Sohail Musa; Winje, Fredrik Lindseth; Velure, Arild

    2018-01-01

    With the continuous scaling of the CMOS technology, the CMOS circuits are considered to be more tolerant to Single event Latchup (SEL) effects due to the reduction in the supply voltages. This paper reports the results from SEL testing performed on the first two prototypes for the new readout ASIC (SAMPA). During RUN 3/RUN 4 at the Large Hadron Collider (LHC), the SAMPA chip will be used for the upgrade of read-out front end electronics of the ALICE (A Large Ion Collider Experiment) Time Projection Chamber (TPC) and Muon Chambers (MCH). The first prototype MPW1 and the second prototype V2 of the SAMPA chip were delivered in 2015 and 2016, respectively. The results are summarized from two different proton beam irradiation campaigns, conducted for SAMPA MPW1 and V2 prototypes at The Svedberg Laboratory (TSL) in Uppsala, and the Center of Advanced Radiation Technology (KVI) in Groningen, respectively.

  12. Latest R&D news and beam test performance of the highly granular SiW-ECAL technological prototype for the ILC

    Science.gov (United States)

    Irles, A.

    2018-02-01

    High precision physics at future colliders as the International Linear Collider (ILC) require unprecedented high precision in the determination of the energy of final state particles. The needed precision will be achieved thanks to the Particle Flow algorithms (PF) which require highly granular and hermetic calorimeters systems. The physical proof of concept of the PF was performed in the previous campaign of beam tests of physic prototypes within the CALICE collaboration. One of these prototypes was the physics prototype of the Silicon-Tungsten Electromagnetic Calorimeter (SiW-ECAL) for the ILC. In this document we present the latest news on R&D of the next generation prototype, the technological prototype with fully embedded very front-end (VFE) electronics, of the SiW-ECAL. Special emphasis is given to the presentation and discussion of the first results from the beam test done at DESY in June 2017. The physics program for such beam test consisted in the calibration and commissioning of the current set of available SiW ECAL modules; the test of performance of individual slabs under 1T magnetic fields; and the study of electromagnetic showers events.

  13. Test-beam and laboratory characterisation of the TORCH prototype detector

    CERN Document Server

    Ros, A; Castillo-Garcia, L; Conneely, T; Cussans, D; Foehl, K; Forty, R; Frei, C; Gao, R; Gys, T; Harnew, N; Milnes, J; Piedigrossi, D; Rademacker, J; Van Dijk, M

    2017-01-01

    The TORCH time-of-flight (TOF) detector is being developed to provide particle identification up to a momentum of 10 GeV/c over a flight distance of 10 m. It has a DIRC-like construction with View the MathML source10mm thick synthetic amorphous fused-silica plates as a Cherenkov radiator. Photons propagate by total internal reflection to the plate periphery where they are focused onto an array of customised position-sensitive micro-channel plate (MCP) detectors. The goal is to achieve a 15 ps time-of-flight resolution per incident particle by combining arrival times from multiple photons. The MCPs have pixels of effective size 0.4 mm×6.6 mm2 in the vertical and horizontal directions, respectively, by incorporating a novel charge-sharing technique to improve the spatial resolution to better than the pitch of the readout anodes. Prototype photon detectors and readout electronics have been tested and calibrated in the laboratory. Preliminary results from testbeam measurements of a prototype TORCH detector are a...

  14. Studies of a full-scale mechanical prototype line for the ANTARES neutrino telescope and tests of a prototype instrument for deep-sea acoustic measurements

    Energy Technology Data Exchange (ETDEWEB)

    Ageron, M. [CPPM-Centre de Physique des Particules de Marseille, CNRS/IN2P3 et Universite de la Mediterranee, 163 Avenue de Luminy, Case 902, 13288 Marseille Cedex 9 (France); Aguilar, J.A. [IFIC-Instituto de Fisica Corpuscular, Edificios Investigacion de Paterna, CSIC-Universitat de Valencia, Apdo. de Correos 22085, 46071 Valencia (Spain); Albert, A. [GRPHE-Groupe de Recherche en Physique des Hautes Energies, Universite de Haute Alsace, 61 Rue Albert Camus, 68093 Mulhouse Cedex (France); Ameli, F. [Dipartimento di Fisica dell' Universita ' La Sapienza' e Sezione INFN, P.le Aldo Moro 2, 00185 Roma (Italy); Anghinolfi, M. [Dipartimento di Fisica dell' Universita e Sezione INFN, Via Dodecaneso 33, 16146 Genova (Italy); Anton, G. [Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Physikalisches Institut, Erwin-Rommel-Str. 1, D-91058 Erlangen (Germany); Anvar, S.; Ardellier-Desages, F. [DSM/DAPNIA-Direction des Sciences de la Matiere, Laboratoire de Recherche sur les lois Fondamentales de l' Univers, CEA Saclay, 91191 Gif-sur-Yvette Cedex (France); Aslanides, E.; Aubert, J.-J. [CPPM-Centre de Physique des Particules de Marseille, CNRS/IN2P3 et Universite de la Mediterranee, 163 Avenue de Luminy, Case 902, 13288 Marseille Cedex 9 (France); Auer, R. [Friedrich-Alexander-Universitaet Erlangen-Nuernberg, Physikalisches Institut, Erwin-Rommel-Str. 1, D-91058 Erlangen (Germany); Barbarito, E. [Dipartimento Interateneo di Fisica e Sezione INFN, Via E. Orabona 4, 70126 Bari (Italy); Basa, S. [LAM-Laboratoire d' Astrophysique de Marseille, CNRS/INSU et Universite de Provence, Traverse du Siphon-Les Trois Lucs, BP 8, 13012 Marseille Cedex 12 (France); Battaglieri, M. [Dipartimento di Fisica dell' Universita e Sezione INFN, Via Dodecaneso 33, 16146 Genova (Italy); Bazzotti, M.; Becherini, Y. [Dipartimento di Fisica dell' Universita e Sezione INFN, Viale Berti Pichat 6/2, 40127 Bologna (Italy)] (and others)

    2007-11-01

    A full-scale mechanical prototype line was deployed to a depth of 2500 m to test the leak tightness of the electronics containers and the pressure-resistant properties of an electromechanical cable under evaluation for use in the ANTARES deep-sea neutrino telescope. During a month-long immersion study, line parameter data were taken using miniature autonomous data loggers and shore-based optical time domain reflectometry. Details of the mechanical prototype line, the electromechanical cable and data acquisition are presented. Data taken during the immersion study revealed deficiencies in the pressure resistance of the electromechanical cable terminations at the entry points to the electronics containers. The improvements to the termination, which have been integrated into subsequent detection lines, are discussed. The line also allowed deep-sea acoustic measurements with a prototype hydrophone system. The technical setup of this system is described, and the first results of the data analysis are presented.

  15. Studies of a full-scale mechanical prototype line for the ANTARES neutrino telescope and tests of a prototype instrument for deep-sea acoustic measurements

    International Nuclear Information System (INIS)

    Ageron, M.; Aguilar, J.A.; Albert, A.; Ameli, F.; Anghinolfi, M.; Anton, G.; Anvar, S.; Ardellier-Desages, F.; Aslanides, E.; Aubert, J.-J.; Auer, R.; Barbarito, E.; Basa, S.; Battaglieri, M.; Bazzotti, M.; Becherini, Y.

    2007-01-01

    A full-scale mechanical prototype line was deployed to a depth of 2500 m to test the leak tightness of the electronics containers and the pressure-resistant properties of an electromechanical cable under evaluation for use in the ANTARES deep-sea neutrino telescope. During a month-long immersion study, line parameter data were taken using miniature autonomous data loggers and shore-based optical time domain reflectometry. Details of the mechanical prototype line, the electromechanical cable and data acquisition are presented. Data taken during the immersion study revealed deficiencies in the pressure resistance of the electromechanical cable terminations at the entry points to the electronics containers. The improvements to the termination, which have been integrated into subsequent detection lines, are discussed. The line also allowed deep-sea acoustic measurements with a prototype hydrophone system. The technical setup of this system is described, and the first results of the data analysis are presented

  16. IOP Latest R&D news and beam test performance of the highly granular SiW-ECAL technological prototype for the ILC

    CERN Document Server

    Irles, Adrián

    2018-02-22

    High precision physics at future colliders as the International Linear Collider (ILC) require unprecedented high precision in the determination of the energy of final state particles. The needed precision will be achieved thanks to the Particle Flow algorithms (PF) which require highly granular and hermetic calorimeters systems. The physical proof of concept of the PF was performed in the previous campaign of beam tests of physic prototypes within the CALICE collaboration. One of these prototypes was the physics prototype of the Silicon-Tungsten Electromagnetic Calorimeter (SiW-ECAL) for the International Large Detector at the ILC. In this document we present the latest nes on R&D of the next generation prototype, the technological prototype with fully embedded very front-end (VFE) electronics, of the SiW-ECAL. Special emphasis is given to the presentation and discussion of the first results from the beam test done at DESY in June 2017. The physics program for such beam test consisted in the calibration a...

  17. Test beam results from a scintillating fibers-lead calorimeter

    International Nuclear Information System (INIS)

    Caria, M.

    1991-01-01

    The SpaCal collaboration has built prototypes of lead-scintillating fibers calorimter. The aim is to check predicted performances. Here are briefly mentioned results obtained from prototypes tests in beam of e, π, μ at CERN. Layers 2m long of extruded lead, were equipped with 1mm fibers in an hexagonal geometry. The ratio of scintillator to lead was 1/4. Results are presented on the most appealing features of such a calorimeter: energy resolution, homogeneity, containment and compensation. It is shown, that excellent energy resolution togehter with compensation has been achieved. (orig.)

  18. The 150 ns detector project: Prototype preamplifier results

    Science.gov (United States)

    Warburton, W. K.; Russell, S. R.; Kleinfelder, Stuart A.

    1994-08-01

    The long-term goal of the 150 ns detector project is to develop a pixel area detector capable of 6 MHz frame rates (150 ns/frame). Our milestones toward this goal are: a single pixel, 1×256 1D and 8×8 2D detectors, 256×256 2D detectors and, finally, 1024 × 1024 2D detectors. The design strategy is to supply a complete electronics chain (resetting preamp, selectable gain amplifier, analog-to-digital converter (ADC), and memory) for each pixel. In the final detectors these will all be custom integrated circuits. The front-end preamplifiers are integrated first, since their design and performance are the most unusual and also critical to the project's success. Similarly, our early work is concentrated on devising and perfecting detector structures. In this paper we demonstrate the performance of prototypes of our integrated preamplifiers. While the final design will have 64 preamps to a chip, including a switchable gain stage, the prototypes were integrated 8 channels to a "Tiny Chip" and tested in 4 configurations (feedback capacitor Cf equal 2.5 or 4.0 pF, output directly or through a source follower). These devices have been tested thoroughly for reset settling times, gain, linearity, and electronic noise. They generally work as designed, being fast enough to easily integrate detector charge, settle, and reset in 150 ns. Gain and linearity appear to be acceptable. Current values of electronic noise, in double-sampling mode, are about twice the design goal of {2}/{3} of a single photon at 6 keV. We expect this figure to improve with the addition of the onboard amplifier stage and improved packaging. Our next test chip will include these improvements and allow testing with our first detector samples, which will be 1×256 (50 μm wide pixels) and 8×8 (1 mm 2 pixels) element detector on 1 mm thick silicon.

  19. Electrostatic sensors for SPIDER experiment: Design, manufacture of prototypes, and first tests

    International Nuclear Information System (INIS)

    Brombin, M.; Spolaore, M.; Serianni, G.; Barzon, A.; Franchin, L.; Pasqualotto, R.; Pomaro, N.; Taliercio, C.; Trevisan, L.; Schiesko, L.

    2014-01-01

    A system of electrostatic sensors has been designed for the SPIDER (Source for the production of Ions of Deuterium Extracted from RF plasma) experiment, prototype RF source of the ITER NBI (neutral beam injection). A prototype of the sensor system was manufactured and tested at the BATMAN (BAvarian Test MAchine for Negative ions) facility, where the plasma environment is similar to that of SPIDER. Different aspects concerning the mechanical manufacturing and the signal conditioning are presented, among them the RF compensation adopted to reduce the RF effects which could lead to overestimated values of the electron temperature. The first commissioning tests provided ion saturation current values in the range assumed for the design, so the deduced plasma density estimate is consistent with the expected values

  20. Electrostatic sensors for SPIDER experiment: Design, manufacture of prototypes, and first tests

    Science.gov (United States)

    Brombin, M.; Spolaore, M.; Serianni, G.; Barzon, A.; Franchin, L.; Pasqualotto, R.; Pomaro, N.; Schiesko, L.; Taliercio, C.; Trevisan, L.

    2014-02-01

    A system of electrostatic sensors has been designed for the SPIDER (Source for the production of Ions of Deuterium Extracted from RF plasma) experiment, prototype RF source of the ITER NBI (neutral beam injection). A prototype of the sensor system was manufactured and tested at the BATMAN (BAvarian Test MAchine for Negative ions) facility, where the plasma environment is similar to that of SPIDER. Different aspects concerning the mechanical manufacturing and the signal conditioning are presented, among them the RF compensation adopted to reduce the RF effects which could lead to overestimated values of the electron temperature. The first commissioning tests provided ion saturation current values in the range assumed for the design, so the deduced plasma density estimate is consistent with the expected values.

  1. Electrostatic sensors for SPIDER experiment: design, manufacture of prototypes, and first tests.

    Science.gov (United States)

    Brombin, M; Spolaore, M; Serianni, G; Barzon, A; Franchin, L; Pasqualotto, R; Pomaro, N; Schiesko, L; Taliercio, C; Trevisan, L

    2014-02-01

    A system of electrostatic sensors has been designed for the SPIDER (Source for the production of Ions of Deuterium Extracted from RF plasma) experiment, prototype RF source of the ITER NBI (neutral beam injection). A prototype of the sensor system was manufactured and tested at the BATMAN (BAvarian Test MAchine for Negative ions) facility, where the plasma environment is similar to that of SPIDER. Different aspects concerning the mechanical manufacturing and the signal conditioning are presented, among them the RF compensation adopted to reduce the RF effects which could lead to overestimated values of the electron temperature. The first commissioning tests provided ion saturation current values in the range assumed for the design, so the deduced plasma density estimate is consistent with the expected values.

  2. Test and characterization of a prototype silicon–tungsten electromagnetic calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Muhuri, Sanjib, E-mail: sanjibmuhuri@vecc.gov.in [Variable Energy Cyclotron Centre, Kolkata 700064 (India); Mukhopadhyay, Sourav; Chandratre, Vinay B.; Sukhwani, Menka [Bhabha Atomic Research Centre, Electronics Division, Trombay, Mumbai 400085 (India); Jena, Satyajit [Indian Institute of Technology, Bombay, Mumbai 400076 (India); Khan, Shuaib Ahmad; Nayak, Tapan K.; Saini, Jogender; Singaraju, Rama Narayana [Variable Energy Cyclotron Centre, Kolkata 700064 (India)

    2014-11-11

    New generation high-energy physics experiments demand high precision tracking and accurate measurements of a large number of particles produced in the collisions of elementary particles and heavy-ions. Silicon–tungsten (Si–W) calorimeters provide the most viable technological option to meet the requirements of particle detection in high multiplicity environments. We report a novel Si–W calorimeter design, which is optimized for γ/π{sup 0} discrimination up to high momenta. In order to test the feasibility of the calorimeter, a prototype mini-tower was constructed using silicon pad detector arrays and tungsten layers. The performance of the mini-tower was tested using pion and electron beams at the CERN Proton Synchrotron (PS). The experimental results are compared with the results from a detailed GEANT-4 simulation. A linear relationship between the observed energy deposition and simulated response of the mini-tower has been obtained, in line with our expectations.

  3. Prototype Engineered Barrier System Field Test (PEBSFT)

    International Nuclear Information System (INIS)

    Ramirez, A.L.; Buscheck, T.; Carlson, R.; Daily, W.; Lee, K.; Lin, Wunan; Mao, Nai-hsien; Ueng, Tzou-Shin; Wang, H.; Watwood, D.

    1991-08-01

    This final report represents a summary of data and interpretations obtained from the Prototype Engineered Barrier System Field Test (PEBSFT) performed in G-Tunnel within the Nevada Test Site. The PEBSFT was conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for future field tests that will be conducted in the Exploratory Studies Facilities (ESF) at Yucca Mountain. The primary objective of the test was to provide a basis for determining whether tests planned for the ESF have the potential to be successful. Chapter 1 on high frequency electromagnetic tomography discusses the rock mass electromagnetic permittivity and attenuation rate changes that were measured to characterize the water distribution in the near field of a simulated waste container. The data are used to obtain quantitative estimates of how the moisture content in the rock mass changes during heating and to infer properties of the spatial variability of water distribution, leading to conclusions about the role of fractures in the system. Chapter 2 discusses the changes in rock moisture content detected by the neutron logging probe. Chapter 3 permeability tests discusses the characterization of the in-situ permeability of the fractured tuff around the borehole. The air permeability testing apparatus, the testing procedures, and the data analysis are presented. Chapter 4 describes the moisture collection system installed in the heater borehole to trap and measure the moisture volumes. Chapter 5 describes relative humidity measurements made with the thermocouple psychrometer and capacitance sensors. Chapter 6 discusses gas pressure measurements in the G-Tunnel, addressing the calibration and installation of piezoresistive-gaged transducers. Chapter 7 describes the calibration and installation of thermocouples for temperature measurements. Chapter 8 discusses the results of the PEBSFT

  4. Development and experimental results from a 1 kW prototype AMR

    DEFF Research Database (Denmark)

    Bahl, Christian R.H.; Engelbrecht, Kurt; Eriksen, Dan

    2014-01-01

    containing an active magnetic regenerator (AMR) bed. The prototype design facilitates easy exchange of the 24 cassettes, allowing the testing of different material amounts and compositions. Operating with 2.8 kg of commercial grade Gd spheres a maximum no-span cooling power of 1010 W and a maximum zero load...

  5. EBR-2 [Experimental Breeder Reactor-2], IFR [Integral Fast Reactor] prototype testing programs

    International Nuclear Information System (INIS)

    Lehto, W.K.; Sackett, J.I.; Lindsay, R.W.; Planchon, H.P.; Lambert, J.D.B.

    1990-01-01

    The Experimental Breeder Reactor-2 (EBR-2) is a sodium cooled power reactor supplying about 20 MWe to the Idaho National Engineering Laboratory (INEL) grid and, in addition, is the key component in the development of the Integral Fast Reactor (IFR). EBR-2's testing capability is extensive and has seen four major phases: (1) demonstration of LMFBR power plant feasibility, (2) irradiation testing for fuel and material development. (3) testing the off-normal performance of fuel and plant systems and (4) operation as the IFR prototype, developing and demonstrating the IFR technology associated with fuel and plant design. Specific programs being carried out in support of the IFR include advanced fuels and materials development and component testing. This paper discusses EBR-2 as the IFR prototype and the associated testing programs. 29 refs

  6. Prototype system tests of the Belle II PXD DAQ system

    Energy Technology Data Exchange (ETDEWEB)

    Fleischer, Soeren; Gessler, Thomas; Kuehn, Wolfgang; Lange, Jens Soeren; Muenchow, David; Spruck, Bjoern [II. Physikalisches Institut, Justus-Liebig-Universitaet Giessen (Germany); Liu, Zhen' An; Xu, Hao; Zhao, Jingzhou [Institute of High Energy Physics, Chinese Academy of Sciences (China); Collaboration: II PXD Collaboration

    2012-07-01

    The data acquisition system for the Belle II DEPFET Pixel Vertex Detector (PXD) is designed to cope with a high input data rate of up to 21.6 GB/s. The main hardware component will be AdvancedTCA-based Compute Nodes (CN) equipped with Xilinx Virtex-5 FX70T FPGAs. The design for the third Compute Node generation was completed recently. The xTCA-compliant system features a carrier board and 4 AMC daughter boards. First test results of a prototype board will be presented, including tests of (a) The high-speed optical links used for data input, (b) The two 2 GB DDR2-chips on the board and (c) Output of data via ethernet, using UDP and TCP/IP with both hardware and software protocol stacks.

  7. Beam test of Cherenkov counter prototype for ZDF setup

    International Nuclear Information System (INIS)

    Kacharava, A.K.; Macharashvili, G.G.; Nioradze, M.S.; Komarov, V.I.; Sopov, V.S.; Chernyshev, V.P.

    1995-01-01

    We describe a Cherenkov counter of total internal reflection for particle separation in the momentum range where all types of particles radiate Cherenkov light. The Cherenkov counter prototype with the lucite radiator was tested on the secondary beam of the ITEP (Moscow) accelerator. Dependence of the photomultiplier pulse height on the particle entrance angle was clearly observed. 4 refs., 4 figs

  8. Test of a high resolution drift chamber prototype

    International Nuclear Information System (INIS)

    Comminchau, V.; Deutschmann, M.; Draheim, K.J.; Fritze, P.; Hangarter, K.; Hawelka, P.; Herten, U.; Tonutti, M.; Anderhub, H.; Fehlmann, J.; Hofer, H.; Klein, M.; Paradiso, J.A.; Schreiber, J.; Viertel, G.

    1984-06-01

    The performance of a drift chamber prototype for a colliding beam vertex detector in a test beam at DESY is described. At one (two) atmosphere gas pressure a spatial resolution of 40 μm (30 μm) per wire for one cm drift length was achieved with a 100 MHz Flash-ADC system. An excellent double track resolution of better than 300 μm over the full drift length of 5 cm can be estimated. (orig.)

  9. Manufacturing and testing of a prototypical divertor vertical target for ITER

    Science.gov (United States)

    Merola, M.; Plöchl, L.; Chappuis, Ph; Escourbiac, F.; Grattarola, M.; Smid, I.; Tivey, R.; Vieider, G.

    2000-12-01

    After an extensive R&D activity, a medium-scale divertor vertical target prototype has been manufactured by the EU Home Team. This component contains all the main features of the corresponding ITER divertor design and consists of two units with one cooling channel each, assembled together and having an overall length and width of about 600 and 50 mm, respectively. The upper part of the prototype has a tungsten macro-brush armour, whereas the lower part is covered by CFC monoblocks. A number of joining techniques were required to manufacture this component as well as an appreciable effort in the development of suitable non-destructive testing methods. The component was high heat flux tested in FE200 electron beam facility at Le Creusot, France. It endured 100 cycles at 5 MW/m 2, 1000 cycles at 10 MW/m 2 and more then 1000 cycles at 15-20 MW/m 2. The final critical heat flux test reached a value in excess of 30 MW/m 2.

  10. Prototype testing and analysis of a novel internal combustion linear generator integrated power system

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Zhaoping; Chang, Siqin [School of Mechanical Engineering, Nanjing University of Science and Technology, Nanjing 210094 (China)

    2010-04-15

    A novel four-stroke free-piston engine equipped with a linear electric generator (namely internal combustion linear generator integrated power system) is proposed in this paper to achieve efficient energy conversion from fuel to electricity. Unique features of the novel power system are presented and their effects on the continuous running are discussed, along with potential advantages and disadvantages compared to conventional engines. A single cylinder, gasoline and spark ignition prototype is fabricated with reference to the geometric and control parameters of an existing conventional four-stroke engine. Stable running of the prototype is realized, and a 2.2 kW average output power with the generating efficiency of 32% has been obtained up to now. The feasibility and performance of the proposed design are verified. Detailed testing results from the continuous running prototype are analyzed in this paper for giving insight into the performance and dynamic behaviors of the novel power system. (author)

  11. Prototypical Rod Construction Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report

  12. 10 CFR 32.101 - Schedule B-prototype tests for luminous safety devices for use in aircraft.

    Science.gov (United States)

    2010-01-01

    ....101 Schedule B—prototype tests for luminous safety devices for use in aircraft. An applicant for a... 10 Energy 1 2010-01-01 2010-01-01 false Schedule B-prototype tests for luminous safety devices for use in aircraft. 32.101 Section 32.101 Energy NUCLEAR REGULATORY COMMISSION SPECIFIC DOMESTIC LICENSES...

  13. In vivo testing of novel vaccine prototypes against Actinobacillus pleuropneumoniae

    DEFF Research Database (Denmark)

    Antenucci, Fabio; Fougeroux, Cyrielle; Deeney, Alannah

    2018-01-01

    vesicles from its outer membrane (OM), accordingly defined as outer membrane vesicles (OMVs). Thanks to their antigenic similarity to the OM, OMVs have emerged as a promising tool in vaccinology. In this study we describe the in vivo testing of several vaccine prototypes for the prevention of infection...

  14. Extending NASA Research Results to Benefit Society: Rapid Prototyping for Coastal Applications

    Science.gov (United States)

    Glorioso, Mark V.; Miller, Richard L.; Hall, Callie M.; McPherson, Terry R.

    2006-01-01

    The mission of the NASA Applied Sciences Program is to expand and accelerate the use of NASA research results to benefit society in 12 application areas of national priority. ONe of the program's major challenges is to perform a quick, efficient, and detailed review (i.e., prototyping) of the large number of combinations of NASA observations and results from Earth system models that may be used by a wide range of decision support tools. A Rapid Prototyping Capacity (RPC) is being developed to accelerate the use of NASA research results. Here, we present the conceptual framework of the Rapid Prototyping Capacity within the context of quickly assessing the efficacy of NASA research results and technologies to support the Coastal Management application. An initial RPC project designed to quickly evaluate the utility of moderate-resolution MODIS products for calibrating/validating coastal sediment transport models is also presented.

  15. Low-Cost Mini Radar: Design Prototyping and Tests

    Directory of Open Access Journals (Sweden)

    Dario Tarchi

    2017-01-01

    Full Text Available Radar systems are largely employed for surveillance of wide and remote areas; the recent advent of drones gives the opportunity to exploit radar sensors on board of unmanned aerial platforms. Nevertheless, whereas drone radars are currently available for military applications, their employment in the civilian domain is still limited. The present research focuses on design, prototyping, and testing of an agile, low-cost, mini radar system, to be carried on board of Remotely Piloted Aircraft (RPAs or tethered aerostats. In particular, the paper faces the challenge to integrate the in-house developed radar sensor with a low-cost navigation board, which is used to estimate attitude and positioning data. In fact, a suitable synchronization between radar and navigation data is essential to properly reconstruct the radar picture whenever the platform is moving or the radar is scanning different azimuthal sectors. Preliminary results, relative to tests conducted in preoperational conditions, are provided and exploited to assert the suitable consistency of the obtained radar pictures. From the results, there is a high consistency between the radar images and the picture of the current environment emerges; finally, the comparison of radar images obtained in different scans shows the stability of the platform.

  16. Prototype bellows sealed nuclear valve development -reliability through testing

    International Nuclear Information System (INIS)

    Dixon, D.F.; Abbas, M.

    1978-01-01

    To assist in appraising bellows sealed valve performance, 10 tests were done on a ''1 in.'' prototype bellows sealed valve design. The tests simulated primary heat transport (PHT) system conditions for a 600 MWe CANDU-PHW. The design approach was to have all valve components outlast the bellows in endurance tests; this was achieved. The valve design meets the Atomic Energy of Canada Limited specification. For comparison, bellows fatigue failure data were fitted to both log-normal and Weibull distributions. A numerical example shows how to select valve stroke amplitude on the basis of valve flow requirement and the minimum acceptable fatigue life. (author)

  17. Comparative Field Tests of Pressurised Rover Prototypes

    Science.gov (United States)

    Mann, G. A.; Wood, N. B.; Clarke, J. D.; Piechochinski, S.; Bamsey, M.; Laing, J. H.

    The conceptual designs, interior layouts and operational performances of three pressurised rover prototypes - Aonia, ARES and Everest - were field tested during a recent simulation at the Mars Desert Research Station in Utah. A human factors experiment, in which the same crew of three executed the same simulated science mission in each of the three vehicles, yielded comparative data on the capacity of each vehicle to safely and comfortably carry explorers away from the main base, enter and exit the vehicle in spacesuits, perform science tasks in the field, and manage geological and biological samples. As well as offering recommendations for design improvements for specific vehicles, the results suggest that a conventional Sports Utility Vehicle (SUV) would not be suitable for analog field work; that a pressurised docking tunnel to the main habitat is essential; that better provisions for spacesuit storage are required; and that a crew consisting of one driver/navigator and two field science crew specialists may be optimal. From a field operations viewpoint, a recurring conflict between rover and habitat crews at the time of return to the habitat was observed. An analysis of these incidents leads to proposed refinements of operational protocols, specific crew training for rover returns and again points to the need for a pressurised docking tunnel. Sound field testing, circulating of results, and building the lessons learned into new vehicles is advocated as a way of producing ever higher fidelity rover analogues.

  18. ITER ECRH Upper Launcher: Test plan for qualification of the Diamond Torus Window Prototype III

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Gagliardi, Mario; Saibene, Gabriella [F4E, Antennas and Plasma Engineering, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany)

    2016-11-01

    Highlights: • A qualification program for the ITER diamond torus window is being developed. • The testing program for the qualification of the bare diamond disk is defined. • First qualification tests show a very good quality of the diamond disk prototypes. - Abstract: The diamond window is part of the electron cyclotron heating upper launcher system for ITER. Together with the isolation valve it constitutes the primary vacuum boundary and it also acts as first tritium barrier. Therefore the window is classified as Safety/Protection Important Component (SIC/PIC) with the nuclear safety function “confinement”. As the diamond window unit is not entirely covered by standard codes, an ad-hoc qualification program needs to be defined, including analysis, prototyping and testing. In the framework of a contract with F4E, the test program for a diamond window prototype is being developed with the aim to prove its operability for normal, accidental and incidental conditions as identified in the ITER load specifications. Tests range from dielectric loss measurements for the bare Chemical Vapour Deposition (CVD) diamond disk up to mechanical and vacuum tests for the complete window assembly. Finally mm-wave properties have to be characterized for the complete window. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete documentation of the process. This paper will present the development of the test plan for a window prototype, which is currently under manufacturing. First tests are directed to the characterization of the bare diamond disk with a focus on its dielectric properties.

  19. Rapid prototyping compliant arterial phantoms for in-vitro studies and device testing

    Directory of Open Access Journals (Sweden)

    Biglino Giovanni

    2013-01-01

    Full Text Available Abstract Background Compliant vascular phantoms are desirable for in-vitro patient-specific experiments and device testing. TangoPlus FullCure 930® is a commercially available rubber-like material that can be used for PolyJet rapid prototyping. This work aims to gather preliminary data on the distensibility of this material, in order to assess the feasibility of its use in the context of experimental cardiovascular modelling. Methods The descending aorta anatomy of a volunteer was modelled in 3D from cardiovascular magnetic resonance (CMR images and rapid prototyped using TangoPlus. The model was printed with a range of increasing wall thicknesses (0.6, 0.7, 0.8, 1.0 and 1.5 mm, keeping the lumen of the vessel constant. Models were also printed in both vertical and horizontal orientations, thus resulting in a total of ten specimens. Compliance tests were performed by monitoring pressure variations while gradually increasing and decreasing internal volume. Knowledge of distensibility was thus derived and then implemented with CMR data to test two applications. Firstly, a patient-specific compliant model of hypoplastic aorta suitable for connection in a mock circulatory loop for in-vitro tests was manufactured. Secondly, the right ventricular outflow tract (RVOT of a patient necessitating pulmonary valve replacement was printed in order to physically test device insertion and assess patient’s suitability for percutaneous pulmonary valve intervention. Results The distensibility of the material was identified in a range from 6.5 × 10-3 mmHg-1 for the 0.6 mm case, to 3.0 × 10-3 mmHg-1 for the 1.5 mm case. The models printed in the vertical orientation were always more compliant than their horizontal counterpart. Rapid prototyping of a compliant hypoplastic aorta and of a RVOT anatomical model were both feasible. Device insertion in the RVOT model was successful. Conclusion Values of distensibility, compared with literature data, show that Tango

  20. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report

  1. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 5 discusses the following topics: Lower Cutting System Test Results and Analysis Report; NFBC Loading System Test Results and Analysis Report; Robotic Bridge Transporter Test Results and Analysis Report; RM-10A Remotec Manipulator Test Results and Analysis Report; and Manipulator Transporter Test Results and Analysis Report

  2. Performance of high-rate TRD prototypes for the CBM experiment in test beam and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Klein-Boesing, Melanie [Institut fuer Kernphysik, Muenster (Germany)

    2008-07-01

    The goal of the future Compressed Baryonic Matter (CBM) experiment is to explore the QCD phase diagram in the region of high baryon densities not covered by other experiments. Among other detectors, it will employ a Transition Radiation Detector (TRD) for tracking of charged particles and electron identification. To meet the demands for tracking and for electron identification at large particle densities and very high interaction rates, high efficiency TRD prototypes have been developed. These prototypes with double-sided pad plane electrodes based on Multiwire Proportional Chambers (MWPC) have been tested at GSI and implemented in the simulation framework of CBM. Results of the performance in a test beam and in simulations are shown. In addition, we present a study of the performance of CBM for electron identification and dilepton reconstruction with this new detector layout.

  3. Prototype Testing of the Wave Energy Converter Wave Dragon

    DEFF Research Database (Denmark)

    Kofoed, Jens Peter; Frigaard, Peter; Friis-Madsen, Erik

    2006-01-01

    The Wave Dragon is an offshore wave energy converter of the overtopping type. It consists of two wave reflectors focusing the incoming waves towards a ramp, a reservoir for collecting the overtopping water and a number of hydro turbines for converting the pressure head into power. In the period...... from 1998 to 2001 extensive wave tank testing on a scale model was carried at Aalborg University. Then, a 57!27 m wide and 237 tonnes heavy (incl. ballast) prototype of the Wave Dragon, placed in Nissum Bredning, Denmark, was grid connected in May 2003 as the world’s first offshore wave energy...... converter. The prototype is fully equipped with hydro turbines and automatic control systems, and is instrumented in order to monitor power production, wave climate, forces in mooring lines, stresses in the structure and movements of the Wave Dragon. In the period May 2003 to January 2005 an extensive...

  4. SPIRAL 2 RFQ Prototype First Tests

    CERN Document Server

    Ferdinand, Robin; Congretel, G; Curtoni, Aline; Delferriere, Olivier; Di Giacomo, Marco; France, Alain; Leboeuf, Didier; Thinel, Jean; Toussaint, Jean-Christian

    2005-01-01

    The SPIRAL2 RFQ is designed to accelerate at 88MHz two kinds of charge-over-mass ratio, Q/A, particles. The proposed injector can accelerate a 5 mA deuteron beam (Q/A=1/2) or a 1 mA particles beam with q/A=1/3 up to 0.75 MeV/A. It is a CW machine which has to show stable operation, provide the request availability, have the minimum losses in order to minimize the activation constraints and show the best quality/cost ratio. The prototype of this 4-vane RFQ has been built and tested. It allowed to verify the mechanical assembly concept (RFQ without any brazing step). The full power was easily injected in the cavity, with no concerns for the RF joints. The paper describes the different achievements.

  5. Sequential Blood Filtration for Extracorporeal Circulation: Initial Results from a Proof-of-Concept Prototype

    Science.gov (United States)

    Herbst, Daniel P.

    2014-01-01

    Abstract: Micropore filters are used during extracorporeal circulation to prevent gaseous and solid particles from entering the patient’s systemic circulation. Although these devices improve patient safety, limitations in current designs have prompted the development of a new concept in micropore filtration. A prototype of the new design was made using 40-μm filter screens and compared against four commercially available filters for performance in pressure loss and gross air handling. Pre- and postfilter bubble counts for 5- and 10-mL bolus injections in an ex vivo test circuit were recorded using a Doppler ultrasound bubble counter. Statistical analysis of results for bubble volume reduction between test filters was performed with one-way repeated-measures analysis of variance using Bonferroni post hoc tests. Changes in filter performance with changes in microbubble load were also assessed with dependent t tests using the 5- and 10-mL bolus injections as the paired sample for each filter. Significance was set at p < .05. All filters in the test group were comparable in pressure loss performance, showing a range of 26–33 mmHg at a flow rate of 6 L/min. In gross air-handling studies, the prototype showed improved bubble volume reduction, reaching statistical significance with three of the four commercial filters. All test filters showed decreased performance in bubble volume reduction when the microbubble load was increased. Findings from this research support the underpinning theories of a sequential arterial-line filter design and suggest that improvements in microbubble filtration may be possible using this technique. PMID:26357790

  6. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 9 discusses the following topics: Integrated System Normal Operations Test Results and Analysis Report; Integrated System Off-Normal Operations Test Results and Analysis Report; and Integrated System Maintenance Operations Test Results and Analysis Report

  7. Manufacturing and testing of a prototypical divertor vertical target for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Merola, M. E-mail: merolam@ipp.mpg.de; Ploechl, L.; Chappuis, Ph.; Escourbiac, F.; Grattarola, M.; Smid, I.; Tivey, R.; Vieider, G

    2000-12-01

    After an extensive R and D activity, a medium-scale divertor vertical target prototype has been manufactured by the EU Home Team. This component contains all the main features of the corresponding ITER divertor design and consists of two units with one cooling channel each, assembled together and having an overall length and width of about 600 and 50 mm, respectively. The upper part of the prototype has a tungsten macro-brush armour, whereas the lower part is covered by CFC monoblocks. A number of joining techniques were required to manufacture this component as well as an appreciable effort in the development of suitable non-destructive testing methods. The component was high heat flux tested in FE200 electron beam facility at Le Creusot, France. It endured 100 cycles at 5 MW/m{sup 2}, 1000 cycles at 10 MW/m{sup 2} and more then 1000 cycles at 15-20 MW/m{sup 2}. The final critical heat flux test reached a value in excess of 30 MW/m{sup 2}.

  8. WorldSID Prototype Dummy Biomechanical Responses.

    Science.gov (United States)

    Cesari, D; Compigne, S; Scherer, R; Xu, L; Takahashi, N; Page, M; Asakawa, K; Kostyniuk, G; Hautmann, E; Bortenschlager, K; Sakurai, M; Harigae, T

    2001-11-01

    The results of biomechanical testing of the WorldSID prototype dummy are presented in this paper. The WorldSID dummy is a new, advanced Worldwide Side Impact Dummy that has the anthropometry of a mid-sized adult male. The first prototype of this dummy has been evaluated by the WorldSID Task Group against previously established corridors for its critical body regions. The response corridors are defined in the International Organization of Standardization (ISO) Technical Report 9790. The prototype is the first version of the WorldSID dummy to be built and tested. This dummy has been subjected to a rigorous program of testing to evaluate, first and foremost its biofidelity, but also its repeatability. Following this initial evaluation, any required modifications will be incorporated into a pre-production version of the WorldSID dummy so that it rates "good" to "excellent" on the ISO dummy biofidelity scale - a rating exceeding that of all current side impact dummies. Also, the overall WorldSID repeatability must not exceed a coefficient of variation of 7% at injury assessment level and this has to be verified for the different body regions. The dummy's head, neck, thorax, abdomen and pelvis were evaluated against the ISO technical report requirements. Testing included drop tests, pendulum impacts, and sled tests. The biofidelity rating of the WorldSID prototype was calculated using the weighted biomechanical test response procedure developed by ISO. The paper presents the results of the testing, which give a very positive indication of the dummy's potential. Based on this evaluation of the dummy biofidelity, the WorldSID prototype dummy exhibits a biofidelity rating of 6.15 that corresponds to an ISO biofidelity classification of "fair". In addition, the dummy shows good repeatability with a global coefficient of variation of 3.30% for the pendulum and rigid sled tests.

  9. Development of large aperture telescope technology (LATT): test results on a demonstrator bread-board

    Science.gov (United States)

    Briguglio, R.; Xompero, M.; Riccardi, A.; Lisi, F.; Duò, F.; Vettore, C.; Gallieni, D.; Tintori, M.; Lazzarini, P.; Patauner, C.; Biasi, R.; D'Amato, F.; Pucci, M.; Pereira do Carmo, João.

    2017-11-01

    The concept of a low areal density primary mirror, actively controlled by actuators, has been investigated through a demonstration prototype. A spherical mirror (400 mm diameter, 2.7 Kg mass) has been manufactured and tested in laboratory and on the optical bench, to verify performance, controllability and optical quality. In the present paper we will describe the prototype and the test results.

  10. Beam test of a full-length prototype of the BESIII drift chamber with the readout electronics

    International Nuclear Information System (INIS)

    Qin, Z.H.; Chen, Y.B.; Sheng, H.Y.; Wu, L.H.; Liu, J.B.; Zhuang, B.A.; Jiang, X.S.; Zhao, Y.B.; Zhu, K.J.; Yan, Z.K.; Chen, C.; Xu, M.H.; Wang, L.; Ma, X.Y.; Tang, X.; Liu, R.G.; Jin, Y.; Zhu, Q.M.; Zhang, G.F.; Wu, Z.; Li, R.Y.; Zhao, P.P.; Dai, H.L.; Li, X.P.; Li, J.

    2007-01-01

    A full-length prototype of the BESIII drift chamber together with its readout electronics was built and a beam test was performed. Two different methods, namely 'single-threshold method' and 'double-threshold method' for timing measurement, were studied. Test results show that the BESIII drift chamber and its readout electronics can reach their design specifications. The 'double-threshold method' results in a better timing accuracy and noise suppression capabilities as compared with the 'single-threshold method'

  11. ELECTROCHEMICAL REMEDIATION OF ARSENIC-CONTAMINATED GROUNDWATER — RESULTS OF PROTOTYPE FIELD TESTS IN BANGLADESH

    Energy Technology Data Exchange (ETDEWEB)

    Kowolik, K; Addy, S.E.A.; Gadgil, A.

    2009-01-01

    According to the World Health Organization (WHO), more than 50 million people in Bangladesh drink arsenic-laden water, making it the largest case of mass poisoning in human history. Many methods of arsenic removal (mostly using chemical adsorbents) have been studied, but most of these are too expensive and impractical to be implemented in poor countries such as Bangladesh. This project investigates ElectroChemical Arsenic Remediation (ECAR) as an affordable means of removing arsenic. Experiments were performed on site in Bangladesh using a prototype termed “sushi”. This device consists of carbon steel sheets that serve as electrodes wrapped into a cylinder, separated by plastic mesh and surrounded by a tube-like container that serves as a holding cell in which the water is treated electrochemically. During the electrochemical process, current is applied to both electrodes causing iron to oxidize to various forms of iron (hydr)oxides. These species bind to arsenic(V) with very high affi nity. ECAR also has the advantage that As(III), the more toxic form of arsenic, oxidizes to As(V) in situ. Only As(V) is known to complex with iron (hydr)oxides. One of the main objectives of this research is to demonstrate the ability of the new prototype to reduce arsenic concentrations in Bangladesh groundwater from >200 ppb to below the WHO limit of 10 ppb. In addition, varying fl ow rate and dosage and the effect on arsenic removal was investigated. Experiments showed that ECAR reduced Bangladeshi water with an initial arsenic concentration as high as 250 ppb to below 10 ppb. ECAR proved to be effective at dosages as high as 810 Coulombs/Liter (C/L) and as low as 386 C/L (current 1 A, voltage 12 V). These results are encouraging and provide great promise that ECAR is an effi cient method in the remediation of arsenic from contaminated groundwater. A preliminary investigation of arsenic removal trends with varying Coulombic dosage, complexation time and fi ltration methods is

  12. The remaining risk to be accepted with test facilities and prototype plants, and the relevant legal provisions of nuclear law

    International Nuclear Information System (INIS)

    Mayinger, T.

    1995-01-01

    The first chapter explains the provisions laid down in nuclear law to assure that precaution is taken to prevent damage resulting from the operation of nuclear power reactors, in order to set a line for comparison with the relevant legal provisions relating to test facilities and prototype plants. The comparative analysis shows that the means and methods of precaution are defined to comprise three approaches, namely measures taken to avert danger, measures taken to prevent danger, and measures for (remaining) risk minimization. All three approaches are intended to prevent occurrence of specifically nuclear events. The second chapter characterizes power reactors, prototype plant and test facilities and develops criteria for distinction. The third chapter establishes the systematics for comparison, showing whether and how the mandatory precaution to prevent damage defined for power reactors, prototype plant, and test facilities can be distinguished from each other, the results being represented in a systematic survey of licensing requirements as laid down in section 7, sub-section 2 ATG (Atomic Energy Act). (orig./HP) [de

  13. Performance test of the prototype-unit for J-PARC machine protection system

    International Nuclear Information System (INIS)

    Sakaki, Hironao; Nakamura, Naoki; Takahashi, Hiroki; Yoshikawa, Hiroshi

    2004-03-01

    In High Intensity Proton Accelerator Project (J-PARC), the high-power proton beam is accelerated. If the beam in J-PARC is not stopped at a few micro seconds or less, the fatal thermal shock destruction is caused on the surface of accelerating structure, because of the high-power proton beam. To avoid the thermal shock damage, we designed the high-speed machine protection system. And, the prototype unit for the system was produced. This report shows the result of its performance test. (author)

  14. Hypervapotron flow testing with rapid prototype models

    International Nuclear Information System (INIS)

    Driemeyer, D.; Hellwig, T.; Kubik, D.; Langenderfer, E.; Mantz, H.; McSmith, M.; Jones, B.; Butler, J.

    1995-01-01

    A flow test model of the inlet section of a three channel hypervapotron plate that has been proposed as a heat sink in the ITER divertor was prepared using a rapid prototyping stereolithography process that is widely used for component development in US industry. An existing water flow loop at the University of Illinois is being used for isothermal flow tests to collect pressure drop data for comparison with proposed vapotron friction factor correlations. Differential pressure measurements are taken, across the test section inlet manifold, the vapotron channel (about a seven inch length), the outlet manifold and the inlet-to-outlet. The differential pressures are currently measured with manometers. Tests were conducted at flow velocities from 1--10 m/s to cover the full range of ITER interest. A tap was also added for a small hypodermic needle to inject dye into the flow channel at several positions to examine the nature of the developing flow field at the entrance to the vapotron section. Follow-on flow tests are planned using a model with adjustable flow channel dimensions to permit more extensive pressure drop data to be collected. This information will be used to update vapotron design correlations for ITER

  15. Development and Experimental Results from a 1 kW Prototype AMR

    DEFF Research Database (Denmark)

    Bahl, Christian; Engelbrecht, Kurt; Eriksen, Dan

    2012-01-01

    containing an active magnetic regenerator (AMR) bed. As outlined in Pryds et al. (2009) a small scale AMR test device has been used for materials choice and optimising operation, with each component being thoroughly characterised and tested before implementation. The prototype design facilitates easy......A novel rotary magnetic refrigeration device has been designed and constructed following the concepts recently outlined in Bahl et al. (2011). The magnet and flow system design allow for almost continuous usage of both the magnetic field and the magnetocaloric material in 24 cassettes, each...

  16. Construction and test of a fine-grained liquid argon preshower prototype

    Science.gov (United States)

    Davis, R. A.; Gingrich, D. M.; Pinfold, J. L.; Rodning, N. L.; Boos, E.; Zhautykov, B. O.; Aubert, B.; Bazan, A.; Beaugiraud, B.; Boniface, J.; Colas, J.; Eynard, G.; Jezequel, S.; Leflour, T.; Linossier, O.; Nicoleau, S.; Rival, F.; Sauvage, G.; Thion, J.; VanDenPlas, D.; Wingerter-Seez, I.; Zitoun, R.; Zolnierowski, Y. P.; Chmeissani, M.; Fernandez, E.; Garrido, Ll.; Martinez, M.; Padilla, C.; Gordon, H. A.; Radeka, V.; Rahm, D.; Stephani, D.; Baisin, L.; Berset, J. C.; Chevalley, J. L.; Gianotti, F.; Gildemeister, O.; Marin, C. P.; Nessi, M.; Poggioli, L.; Richter, W.; Vuillemin, V.; Baze, J. M.; Gosset, L.; Lavocat, P.; Lottin, J. P.; Mansoulié, B.; Meyer, J. P.; Renardy, J. F.; Schwindling, J.; Teiger, J.; Collot, J.; de Saintignon, P.; Dzahini, D.; Hostachy, J. Y.; Hoummada, A.; Laborie, G.; Mahout, G.; Hervas, L.; Chekhtman, A.; Cousinou, M. C.; Dargent, P.; Dinkespiller, B.; Etienne, F.; Fassnacht, P.; Fouchez, D.; Martin, L.; Miotto, A.; Monnier, E.; Nagy, E.; Olivetto, C.; Tisserant, S.; Battistoni, G.; Camin, D. V.; Cavalli, D.; Costa, G.; Cozzi, L.; Fedyakin, N.; Ferrari, A.; Mandelli, L.; Mazzanti, M.; Perini, L.; Resconi, S.; Sala, P.; Beaudoin, G.; Depommier, P.; León-Florián, E.; Leroy, C.; Roy, P.; Augé, E.; Chase, R.; Chollet, J. C.; de La Taille, C.; Fayard, L.; Fournier, D.; Hrisoho, A.; Merkel, B.; Noppe, J. M.; Parrour, G.; Pétroff, P.; Schaffer, A.; Seguin-Moreau, N.; Serin, L.; Tisserand, V.; Vichou, I.; Canton, B.; David, J.; Genat, J. F.; Imbault, D.; Le Dortz, O.; Savoy-Navarro, A.; Schwemling, P.; Eek, L. O.; Lund-Jensen, B.; Söderqvist, J.; Lefebvre, M.; Robertson, S.; RD3 Collaboration

    1997-02-01

    A separate liquid argon preshower detector consisting of two layers featuring a fine granularity of 2.5 × 10 -3 was studied by the RD3 collaboration. A prototype covering approximately 0.8 in pseudo-rapidity and 9° in azimuth was built and tested at CERN in July 94. CMOS and GaAs VLSI preamplifiers were designed and tested for this occasion. The combined response of this detector and an accordion electromagnetic calorimeter prototype to muons, electrons and photons is presented. For minimum ionizing tracks a signal-to-noise ratio of 4.5 per preshower layer was measured. Above 150 GeV the space resolution for electrons is better than 250 μm in both directions. The precision on the electromagnetic shower direction, determined together with the calorimeter, is better than 4 mrad above 50 GeV. It is concluded that the preshower detector would adequately fulfil its role for future operation at CERN Large Hadron Collider.

  17. Construction and test of a fine-grained liquid argon preshower prototype

    International Nuclear Information System (INIS)

    Davis, R.A.; Gingrich, D.M.; Pinfold, J.L.

    1997-01-01

    A separate liquid argon preshower detector consisting of two layers featuring a fine granularity of 2.5 x 10 -3 was studied by the RD3 collaboration. A prototype covering approximately 0.8 in pseudo-rapidity and 9 circle in azimuth was built and tested at CERN in July 94. CMOS and GaAs VLSI preamplifiers were designed and tested for this occasion. The combined response of this detector and an accordion electromagnetic calorimeter prototype to muons, electrons and photons is presented. For minimum ionizing tracks a signal-to-noise ratio of 4.5 per preshower layer was measured. Above 150 GeV the space resolution for electrons is better than 250 μm in both directions. The precision on the electromagnetic shower direction, determined together with the calorimeter, is better than 4 mrad above 50 GeV. It is concluded that the preshower detector would adequately fulfil its role for future operation at CERN Large Hadron Collider. (orig.)

  18. Construction and test of a fine-grained liquid argon preshower prototype

    CERN Document Server

    Davis, R; Pinfold, J L; Rodning, N L; Boos, E; Zhautykov, B O; Aubert, Bernard; Bazan, A; Beaugiraud, B; Boniface, J; Colas, Jacques; Eynard, G; Jézéquel, S; Le Flour, T; Linossier, O; Nicoleau, S; Rival, F; Sauvage, G; Thion, J; Van den Plas, D; Wingerter-Seez, I; Zitoun, R; Zolnierowski, Y; Chmeissani, M; Fernández, E; Garrido, L; Martínez, M; Padilla, C; Gordon, H A; Radeka, V; Rahm, David Charles; Stephani, D; Baisin, L; Berset, J C; Chevalley, J L; Gianotti, F; Gildemeister, O; Marin, C P; Nessi, Marzio; Poggioli, Luc; Richter, W; Vuillemin, V; Baze, J M; Gosset, L G; Lavocat, P; Lottin, J P; Mansoulié, B; Meyer, J P; Renardy, J F; Schwindling, J; Teiger, J; Collot, J; de Saintignon, P; Dzahini, D; Hostachy, J Y; Hoummada, A; Laborie, G; Mahout, G; Hervás, L; Chekhtman, A; Cousinou, M C; Dargent, P; Dinkespiler, B; Etienne, F; Fassnacht, P; Fouchez, D; Martin, L; Miotto, A; Monnier, E; Nagy, E; Olivetto, C; Tisserant, S; Battistoni, G; Camin, D V; Cavalli, D; Costa, G; Cozzi, L; Fedyakin, N N; Ferrari, A; Mandelli, L; Mazzanti, M; Perini, L; Resconi, S; Sala, P R; Beaudoin, G; Depommier, P; León-Florián, E; Leroy, C; Roy, P; Augé, E; Chase, Robert L; Chollet, J C; de La Taille, C; Fayard, Louis; Fournier, D; Hrisoho, A T; Merkel, B; Noppe, J M; Parrour, G; Pétroff, P; Schaffer, A C; Seguin-Moreau, N; Serin, L; Tisserand, V; Vichou, I; Canton, B; David, J; Genat, J F; Imbault, D; Le Dortz, O; Savoy-Navarro, Aurore; Schwemling, P; Eek, L O; Lund-Jensen, B; Söderqvist, J; Lefebvre, M; Robertson, S

    1997-01-01

    A separate liquid argon preshower detector consisting of two layers featuring a fine granularity of 2.5~10$^{\\mathrm{-3}}$ was studied by the RD3 collaboration. A prototype covering approximately 0.8 in pseudo-rapidity and 9 degrees in azimuth was built and tested at CERN in July 94. CMOS and GaAs VLSI preamplifiers were designed and tested for this occasion. The combined response of this detector and an accordion electromagnetic calorimeter prototype to muons, electrons and photons is presented. For minimum ionizing tracks a signal-to-noise ratio of 4.5 per preshower layer was measured. Above 150~GeV the space resolution for electrons is better than 250~$\\mu$m in both directions. The precision on the electromagnetic shower direction, determined together with the calorimeter, is better than 4 mrad above 50~GeV. It is concluded that the preshower detector would adequately fulfil its role for future operation at CERN Large Hadron Collider.

  19. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 2 discusses the following topics: Fuel Rod Extraction System Test Results and Analysis Reports and Clamping Table Test Results and Analysis Reports

  20. Hollow Fiber Flight Prototype Spacesuit Water Membrane Evaporator Design and Testing

    Science.gov (United States)

    Bue, Grant; Vogel, Matt; Makinen, Janice; Tsioulos, Gus

    2010-01-01

    The spacesuit water membrane evaporator (SWME) is being developed to perform thermal control for advanced spacesuits and to take advantage of recent advances in micropore membrane technology. This results in a robust heat-rejection device that is potentially less sensitive to contamination than is the sublimator. The Membrana Celgard X50-215 microporous hollow-fiber (HoFi) membrane was selected after recent extensive testing as the most suitable candidate among commercial alternatives for continued SWME prototype development. The current design was based on a previous design that grouped the fiber layers into stacks, which were separated by small spaces and packaged into a cylindrical shape. This was developed into a full-scale prototype consisting of 14,300 tube bundled into 30 stacks, each of which is formed into a chevron shape and separated by spacers and organized into three sectors of 10 nested stacks. The new design replaced metal components with plastic ones, and has a custom built flight like backpressure valve mounted on the side of the SWME housing to reduce backpressure when fully open. The spacers that provided separation of the chevron fiber stacks were eliminated. Vacuum chamber testing showed improved heat rejection as a function of inlet water temperature and water vapor backpressure compared with the previous design. Other tests pushed the limits of tolerance to freezing and showed suitability to reject heat in a Mars pressure environment with and without a sweep gas. Tolerance to contamination by constituents expected to be found in potable water produced by distillation processes was tested in a conventional way by allowing constituents to accumulate in the coolant as evaporation occurs. For this purpose, the SWME cartridge has endured an equivalent of 30 EVAs exposure and demonstrated minimal performance decline.

  1. Results of Magnetic Axis Measurements on a Prototype Main Lattice Quadrupole for the LHC

    CERN Document Server

    Smirnov, N; Deferne, G; Parma, V; Rohmig, P; Tortschanoff, Theodor

    2004-01-01

    More than 470 twin aperture lattice quadrupoles are needed for the Large Hadron Collider (LHC) under construction at CERN. The lattice quadrupole, assembled with correction magnets in its helium enclosure - the cold mass and integrated in a common cryostat called the Short Straight Section (SSS). All SSS cold mass prototypes have been developed and built by CEA (Saclay) in collaboration with CNRS (Orsay, France). The last SSS prototype (SSS5) was used to investigate the behavior of the magnetic axis through various steps of the installation cycle for the series quadrupoles: including transportation, thermal-cycles, and being lowered into the tunnel. Results of extensive measurements before and after each of these stages are presented here, showing that the effect of transport is weak and within the window of measurement resolution. Also shown is that the long-term stability observed during two years is comparable with the requirements from magnet tolerances. To minimize systematic errors, all tests were perfo...

  2. Testing of the scintillation sandwich prototype

    International Nuclear Information System (INIS)

    Vashkevich, V.

    1995-06-01

    The 3 m 2 prototype of the surface detector using optical fiber readout was completely prepared for testing measurements in February 1995 at Fermilab. Two 25 mm thick, 3 m 2 acrylic scintillation plates (1.2 x 2.5 m 2 ) are used for light collection in the upper (above the 25 mm steel plate) and lower (below the steel) counters of the sandwich. The light is collected with the help of 1 mm diameter wavelength shifter fiber loops 3 m long inserted in the grooves on the top surface of the scintillator, 3 fibers per groove. We used Kurary Y11, 200 ppm of shifter dye, and double clad fibers. 1.5 m of clear fibers spliced to each end of the shifter fiber transport the light to the phototube. Spacing between the grooves is 5 cm. The counter's edges were painted with BICRON (BC620) white reflective paint. The scintillation plates were wrapped with Dupont Tyvek. The glued bundle of fibers is connected to an EMI-9902KB 38 mm phototube through the simple light mixer bar. Used PM has a ''green extended'' rubidium bialkali photocathode. The report contains information on the testing of the scintillation sandwich

  3. Design of the task-based display prototype and the first user-test

    International Nuclear Information System (INIS)

    Svengren, Haakan; Strand, Stine

    2005-09-01

    This report provides a description of the Task-based displays prototype for BWRs, and documents the results of the first user-test. Three different kinds of Task-based displays were designed: 1) displays for performing first checks and obtaining overview in emergency situations, 2) displays for performing emergency procedures, and 3) displays that facilitate understanding of the process and logic. The procedures included an expert-help function to support the operators in performing the procedures. The design was only implemented on the reactor side of the plant. The user-test was conducted using the HAMBO simulator in HAMMLAB. 6 crews from Forsmark 3 and Oskarshamn 3 participated in the test. The crews participated in 4 scenarios, which all were considered as highly complex scenarios that included actuation of several reactor protection signals. The data collection techniques (questionnaires and interviews) intended to cover usability-related issues and mainly involved the reactor operators. The results demonstrated that the Task-based design approach was very well received by the operators, and that the work initiated by the design of this first prototype should be continued. The operators generally found the procedure-implementation and the displays useful and easy to understand. They considered the amount of information contained in the procedures and the displays as good, and associated with low levels of frustration. The expert-help provided in the current test was very premature. This resulted in somewhat poorer usability ratings compared to the procedures and the displays. However, the operators explicitly stated the usefulness of providing expert-help in the combination with computerized procedures. The operators rated the computer-based procedures as slightly easier, less time-consuming, and slightly less mentally demanding than paper-based procedures. All the operators considered navigation within and between the procedures as easy, although some

  4. Developing software to "track and catch" missed follow-up of abnormal test results in a complex sociotechnical environment.

    Science.gov (United States)

    Smith, M; Murphy, D; Laxmisan, A; Sittig, D; Reis, B; Esquivel, A; Singh, H

    2013-01-01

    Abnormal test results do not always receive timely follow-up, even when providers are notified through electronic health record (EHR)-based alerts. High workload, alert fatigue, and other demands on attention disrupt a provider's prospective memory for tasks required to initiate follow-up. Thus, EHR-based tracking and reminding functionalities are needed to improve follow-up. The purpose of this study was to develop a decision-support software prototype enabling individual and system-wide tracking of abnormal test result alerts lacking follow-up, and to conduct formative evaluations, including usability testing. We developed a working prototype software system, the Alert Watch And Response Engine (AWARE), to detect abnormal test result alerts lacking documented follow-up, and to present context-specific reminders to providers. Development and testing took place within the VA's EHR and focused on four cancer-related abnormal test results. Design concepts emphasized mitigating the effects of high workload and alert fatigue while being minimally intrusive. We conducted a multifaceted formative evaluation of the software, addressing fit within the larger socio-technical system. Evaluations included usability testing with the prototype and interview questions about organizational and workflow factors. Participants included 23 physicians, 9 clinical information technology specialists, and 8 quality/safety managers. Evaluation results indicated that our software prototype fit within the technical environment and clinical workflow, and physicians were able to use it successfully. Quality/safety managers reported that the tool would be useful in future quality assurance activities to detect patients who lack documented follow-up. Additionally, we successfully installed the software on the local facility's "test" EHR system, thus demonstrating technical compatibility. To address the factors involved in missed test results, we developed a software prototype to account for

  5. Rapid prototyping compliant arterial phantoms for in-vitro studies and device testing.

    Science.gov (United States)

    Biglino, Giovanni; Verschueren, Peter; Zegels, Raf; Taylor, Andrew M; Schievano, Silvia

    2013-01-16

    Compliant vascular phantoms are desirable for in-vitro patient-specific experiments and device testing. TangoPlus FullCure 930 is a commercially available rubber-like material that can be used for PolyJet rapid prototyping. This work aims to gather preliminary data on the distensibility of this material, in order to assess the feasibility of its use in the context of experimental cardiovascular modelling. The descending aorta anatomy of a volunteer was modelled in 3D from cardiovascular magnetic resonance (CMR) images and rapid prototyped using TangoPlus. The model was printed with a range of increasing wall thicknesses (0.6, 0.7, 0.8, 1.0 and 1.5 mm), keeping the lumen of the vessel constant. Models were also printed in both vertical and horizontal orientations, thus resulting in a total of ten specimens. Compliance tests were performed by monitoring pressure variations while gradually increasing and decreasing internal volume. Knowledge of distensibility was thus derived and then implemented with CMR data to test two applications. Firstly, a patient-specific compliant model of hypoplastic aorta suitable for connection in a mock circulatory loop for in-vitro tests was manufactured. Secondly, the right ventricular outflow tract (RVOT) of a patient necessitating pulmonary valve replacement was printed in order to physically test device insertion and assess patient's suitability for percutaneous pulmonary valve intervention. The distensibility of the material was identified in a range from 6.5 × 10(-3) mmHg(-1) for the 0.6 mm case, to 3.0 × 10(-3) mmHg(-1) for the 1.5 mm case. The models printed in the vertical orientation were always more compliant than their horizontal counterpart. Rapid prototyping of a compliant hypoplastic aorta and of a RVOT anatomical model were both feasible. Device insertion in the RVOT model was successful. Values of distensibility, compared with literature data, show that TangoPlus is suitable for manufacturing arterial phantoms, with

  6. Rapid prototyping of centrifugal microfluidic modules for point of care blood testing

    CSIR Research Space (South Africa)

    Madzivhandila, Phophi

    2016-11-01

    Full Text Available We present modular centrifugal microfluidic devices that enable a series of blood tests to be performed towards a full blood count. The modular approach allows for rapid prototyping of device components in a generic format to complete different...

  7. Tests on full-scale prototypical passive containment condenser for SBWR's application

    International Nuclear Information System (INIS)

    Masoni, P.; Bianchini, G.; Billig, P.F.; Fitch, J.R.; Botti, S.; Cattadori, G.; Silverii, R.

    1995-01-01

    The paper gives a brief description of the experimental program Performance ANalysis and Testing of HEat Removal Systems (PANTHERS) aimed to demonstrate the thermal-hydraulic and structural performance of a full scale prototype of the Passive Containment Cooling (PCC) heat exchanger. Preliminary results of the experimental tests are given. These results show the thermal-hydraulic performance of the heat exchanger as a function of inlet pressure and of the air mass fraction for some steady-state performance tests and for a test in which the water level in the PCC pool is allowed to drop and the PCC tubes to uncover and for a test with non-condensable build-up. The experimental results are very positive and show a very good repeatability. The structural design of the heat exchanger is very robust: the unit has survived ten loss-of-coolant accident (LOCA) cycles and more than 100 thermal-hydraulic performance tests. A detailed GE proprietary version of the Transient Reactor Analysis Code (TRACG) model of the PANTHERS tests facility was developed and verified solely on the basis of as-designed test facility drawings and engineering judgement. No PANTHERS test data, including shakedown data, was used to guide the development of this model. Using the PANTHERS TRACG model, pre-test calculations of Tests No.15-1 and 23-1 from the Test group 3 of the PANTHERS test matrix were made. The key results from these calculations have been documented in this paper. For comparison, a second set of calculations was made using the simplified PCC representation from the SBWR containment TRACG input model used for containment performance evaluations. The results from the simplified model have been compared with those from the detailed PANTHERS model and with those from the tests; the reasons for the observed differences have been discussed. Given the limitation in the double-blind pre-test calculations, the results are very satisfying for both the heat removal and the total pressure drop

  8. Test beam performance of a tracking TRD [Transition Radiation Detector] prototype

    International Nuclear Information System (INIS)

    Shank, J.T.; Whitaker, J.S.; Polychronakos, V.A.; Radeka, V.; Stephani, D.; Beker, H.; Bock, R.K.; Botlo, M.; Fabjan, C.W.; Pfennig, J.; Price, M.J.; Willis, W.J.; Akesson, T.; Chernyatin, V.; Dolgoshein, B.; Nevsky, P.; Potekhin, M.; Romanjuk, A.; Sosnovtsev, V.; Gavrilenko, I.; Muravjev, S.; Shmeleva, A.

    1990-01-01

    A Tracking Transition Radiation Detector prototype has been constructed and tested. It consists of 240 straw tubes, 4 mm in diameter, imbedded in a polyethylene block acting as the radiator. Its performance as an electron identifier as well as a tracking device for minimum ionizing particles has been determined. 2 refs., 6 figs

  9. Cold Test and Performance Evaluation of Prototype Cryoline-X

    Science.gov (United States)

    Shah, N.; Choukekar, K.; Kapoor, H.; Muralidhara, S.; Garg, A.; Kumar, U.; Jadon, M.; Dash, B.; Bhattachrya, R.; Badgujar, S.; Billot, V.; Bravais, P.; Cadeau, P.

    2017-12-01

    The multi-process pipe vacuum jacketed cryolines for the ITER project are probably world’s most complex cryolines in terms of layout, load cases, quality, safety and regulatory requirements. As a risk mitigation plan, design, manufacturing and testing of prototype cryoline (PTCL) was planned before the approval of final design of ITER cryolines. The 29 meter long PTCL consist of 6 process pipes encased by thermal shield inside Outer Vacuum Jacket of DN 600 size and carries cold helium at 4.5 K and 80 K. The global heat load limit was defined as 1.2 W/m at 4.5 K and 4.5 W/m at 80 K. The PTCL-X (PTCL for Group-X cryolines) was specified in detail by ITER-India and designed as well as manufactured by Air Liquide. PTCL-X was installed and tested at cryogenic temperature at ITER-India Cryogenic Laboratory in 2016. The heat load at 4.5 K and 80 K, estimated using enthalpy difference method, was found to be approximately 0.8 W/m at 4.5 K, 4.2 W/m at 80 K, which is well within the defined limits. Thermal shield temperature profile was also found to be satisfactory. Paper summarizes the cold test results of PTCL-X

  10. Commissioning and First Results from the Fermilab Cryomodule Test Stand

    Energy Technology Data Exchange (ETDEWEB)

    Harms, Elvin; et al.

    2017-05-01

    A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

  11. Construction of a full-length prototype of the BESIII drift chamber and on-detector test for the BESIII drift chamber electronics

    International Nuclear Information System (INIS)

    Qin Zhonghua; Wu Linghui; Liu Jianbei; Chinese Academy of Sciences, Beijing; Yan Zhikang; Hunan Univ., Changsha; Chen Yuanbo; Chen Chang; Xu Meihang; Wang Lan; Ma Xiaoyan; Jin Yan; Liu Rongguang; Tang Xiao; Zhang Guifang; Zhu Qiming; Sheng Huayi; Zhu Kejun

    2007-01-01

    A full-length prototype of the BESIII drift chamber was built. The experience gained on gas sealing, high voltage supply and front-end electronics installation should be greatly beneficial to the successful construction of the BESIII drift chamber. An on-detector test of the BESIII drift chamber electronics was carried out with the constructed prototype chamber. The noise performance, drift time and charge measurements, and electronics gains were examined specifically. The final test results indicate that the electronics have a good performance and can satisfy their design requirements. (authors)

  12. Fast-prototyping of VLSI

    International Nuclear Information System (INIS)

    Saucier, G.; Read, E.

    1987-01-01

    Fast-prototyping will be a reality in the very near future if both straightforward design methods and fast manufacturing facilities are available. This book focuses, first, on the motivation for fast-prototyping. Economic aspects and market considerations are analysed by European and Japanese companies. In the second chapter, new design methods are identified, mainly for full custom circuits. Of course, silicon compilers play a key role and the introduction of artificial intelligence techniques sheds a new light on the subject. At present, fast-prototyping on gate arrays or on standard cells is the most conventional technique and the third chapter updates the state-of-the art in this area. The fourth chapter concentrates specifically on the e-beam direct-writing for submicron IC technologies. In the fifth chapter, a strategic point in fast-prototyping, namely the test problem is addressed. The design for testability and the interface to the test equipment are mandatory to fulfill the test requirement for fast-prototyping. Finally, the last chapter deals with the subject of education when many people complain about the lack of use of fast-prototyping in higher education for VLSI

  13. ITER ECRH upper launcher torus diamond window – Prototyping, testing and qualification

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany); Ikeda, Ryosuke; Oda, Yasuhisa; Sakamoto, Keishi; Takahashi, Koji [Japan Atomic Energy Agency (JAEA), Plasma Heating Technology Group, 801-1 Mukoyama, Naka, Ibaraki 311-0193 (Japan); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Association KIT-EURATOM, P.O. Box 3640, D-76021 Karlsruhe (Germany)

    2015-10-15

    Highlights: • The diamond window prototype shows a very good transmission capability during high power RF experiments. • An ad-hoc qualification programme for the diamond torus window is being developed (contract between KIT and F4E). • The window design has been updated focused on its mechanical integrity and manufacturing aspects. - Abstract: The diamond window assembly is part of the ITER primary vacuum boundary and acts as the first tritium barrier and therefore it is classified as Safety/Protection Important Component (SIC/PIC). It consists of an ultra-low loss CVD diamond disk mounted in a system of metallic parts (copper/steel) and has to fulfil adequate transmission capability for high power mm-waves. High power RF experiments with a 1st window prototype had shown parasitic heating due to small gaps in the housing. After a design optimization directed to the mm-wave properties, the parasitic excitations of oscillations have been avoided in a 2nd prototype. This one is equipped with inserted waveguide structures, which cover gaps in the metallic structure of the window housing. From high power RF-measurements with a 0.86 MW/100 s pulse a loss tangent of 7.1 × 10{sup −6} could be estimated, corresponding to an increase of temperature of only 120 mK between inlet and outlet of the cooling system. The diamond window assemblies cannot be entirely covered by codes and standards. To comply with the French safety regulations, instead an ad-hoc qualification programme is required, being developed in the framework of a contract between KIT and F4E. A new prototype (3rd) will be built, which is designed to fit to the single HELICOFLEX sealed waveguide structures of the ex-vessel mm-system of the EC upper launcher (UL). The testing programme ranges from mechanical to vacuum tests up to dielectric loss measurements at low and high power. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete

  14. Sodium tests on an integrated purification prototype for a sodium-cooled fast breeder reactor

    International Nuclear Information System (INIS)

    Abramson, R.

    1984-04-01

    This paper describes sodium tests performed on the integrated primary sodium purification prototype of the Creys Malville Super Phenix 1 fast breeder reactor. These tests comprised: - hydrostatic test, - thermal tests, - handling tests. They enabled a number of new technological arrangements to be qualified and provided the necessary information for the design and construction of the Super Phenix 1 purification units

  15. International testing of a Mars rover prototype

    Science.gov (United States)

    Kemurjian, Alexsandr Leonovich; Linkin, V.; Friedman, L.

    1993-03-01

    Tests on a prototype engineering model of the Russian Mars 96 Rover were conducted by an international team in and near Death Valley in the United States in late May, 1992. These tests were part of a comprehensive design and testing program initiated by the three Russian groups responsible for the rover development. The specific objectives of the May tests were: (1) evaluate rover performance over different Mars-like terrains; (2) evaluate state-of-the-art teleoperation and autonomy development for Mars rover command, control and navigation; and (3) organize an international team to contribute expertise and capability on the rover development for the flight project. The range and performance that can be planned for the Mars mission is dependent on the degree of autonomy that will be possible to implement on the mission. Current plans are for limited autonomy, with Earth-based teleoperation for the nominal navigation system. Several types of television systems are being investigated for inclusion in the navigation system including panoramic camera, stereo, and framing cameras. The tests used each of these in teleoperation experiments. Experiments were included to consider use of such TV data in autonomy algorithms. Image processing and some aspects of closed-loop control software were also tested. A micro-rover was tested to help consider the value of such a device as a payload supplement to the main rover. The concept is for the micro-rover to serve like a mobile hand, with its own sensors including a television camera.

  16. The OPAL vertex detector prototype

    International Nuclear Information System (INIS)

    Roney, J.M.; Armitage, J.C.; Carnegie, R.K.; Giles, G.L.; Hemingway, R.J.; McPherson, A.C.; Pinfold, J.L.; Waterhouse, J.; Godfrey, L.; Hargrove, C.K.

    1989-01-01

    The prototype test results of a high resolution charged particle tracking detector are reported. The detector is designed to measure vertex topologies of particles produced in the e + e - collisions of the OPAL experiment at LEP. The OPAL vertex detector is a 1 m long, 0.46 m diameter cylindrical drift chamber consisting of an axial and stereo layer each of which is divided into 36 jet cells. A prototype chamber containing four axial and two stereo cells was studied using a pion test beam at CERN. The studies examined the prototype under a variety of operating conditions. An r-Φ resolution of 60 μm was obtained when the chamber was operated with argon (50%)-ethane (50%) at 3.75 bar, and when CO 2 (80%)-isobutane (20%) at 2.5 bar was used a 25 μm resolution was achieved. A z measurement using end-to-end time difference has a resolution of 3.5 cm. The details of these prototype studies are discussed in this paper. (orig.)

  17. Sharing Data between Mobile Devices, Connected Vehicles and Infrastructure Task 10: D2X Hub Prototype Acceptance Test Plan and Summary Report.

    Science.gov (United States)

    2017-10-27

    This Devices to Everything (D2X) Acceptance Test Plan (ATP) and Summary Report provides the plan, test cases, and test procedures that were used to verify Prototype System (version 2.0) system requirements, as well as a summary of results of the test...

  18. Prototype ion source for JT-60 neutral beam injectors

    International Nuclear Information System (INIS)

    Akiba, M.

    1981-01-01

    A prototype ion source for JT-60 neutral beam injectors has been fabricated and tested. Here, we review the construction of the prototype ion source and report the experimental results about the source characteristics that has been obtained at this time. The prototype ion source is now installed at the prototype unit of JT-60 neutral beam injection units and the demonstration of the performances of the ion source and the prototype unit has just started

  19. Beam test results of STS prototype modules for the future accelerator experiments FAIR/CBM and NICA/MPD projects

    Science.gov (United States)

    Kharlamov, Petr; Dementev, Dmitrii; Shitenkov, Mikhail

    2017-10-01

    High-energy heavy-ion collision experiments provide the unique possibility to create and investigate extreme states of strongly-interacted matter and address the fundamental aspects of QCD. The experimental investigation the QCD phase diagram would be a major breakthrough in our understanding of the properties of nuclear matter. The reconstruction of the charged particles created in the nuclear collisions, including the determination of their momenta, is the central detection task in high-energy heavy-ion experiments. It is taken up by the Silicon Tracking System in CBM@FAIR and by Inner Tracker in MPD@NICA currently under development. These experiments requires very fast and radiation hard detectors, a novel data read-out and analysis concept including free streaming front-end electronics. Thermal and beam tests of prototype detector modules for these tracking systems showed the stability of sensors and readout electronics operation.

  20. Developing Software to “Track and Catch” Missed Follow-up of Abnormal Test Results in a Complex Sociotechnical Environment

    Science.gov (United States)

    Smith, M.; Murphy, D.; Laxmisan, A.; Sittig, D.; Reis, B.; Esquivel, A.; Singh, H.

    2013-01-01

    Summary Background Abnormal test results do not always receive timely follow-up, even when providers are notified through electronic health record (EHR)-based alerts. High workload, alert fatigue, and other demands on attention disrupt a provider’s prospective memory for tasks required to initiate follow-up. Thus, EHR-based tracking and reminding functionalities are needed to improve follow-up. Objectives The purpose of this study was to develop a decision-support software prototype enabling individual and system-wide tracking of abnormal test result alerts lacking follow-up, and to conduct formative evaluations, including usability testing. Methods We developed a working prototype software system, the Alert Watch And Response Engine (AWARE), to detect abnormal test result alerts lacking documented follow-up, and to present context-specific reminders to providers. Development and testing took place within the VA’s EHR and focused on four cancer-related abnormal test results. Design concepts emphasized mitigating the effects of high workload and alert fatigue while being minimally intrusive. We conducted a multifaceted formative evaluation of the software, addressing fit within the larger socio-technical system. Evaluations included usability testing with the prototype and interview questions about organizational and workflow factors. Participants included 23 physicians, 9 clinical information technology specialists, and 8 quality/safety managers. Results Evaluation results indicated that our software prototype fit within the technical environment and clinical workflow, and physicians were able to use it successfully. Quality/safety managers reported that the tool would be useful in future quality assurance activities to detect patients who lack documented follow-up. Additionally, we successfully installed the software on the local facility’s “test” EHR system, thus demonstrating technical compatibility. Conclusion To address the factors involved in missed

  1. Development and Testing of a Prototype Grid-Tied Photovoltaic Power System

    Science.gov (United States)

    Eichenberg, Dennis J.

    2009-01-01

    The NASA Glenn Research Center (GRC) has developed and tested a prototype 2 kW DC grid-tied photovoltaic (PV) power system at the Center. The PV system has generated in excess of 6700 kWh since operation commenced in July 2006. The PV system is providing power to the GRC grid for use by all. Operation of the prototype PV system has been completely trouble free. A grid-tied PV power system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provide valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. Based upon the success of the prototype PV system, additional PV power system expansion at GRC is under consideration. The prototype grid-tied PV power system was successfully designed and developed which served to validate the basic principles described, and the theoretical work that was performed. The report concludes that grid-tied photovoltaic power systems are reliable, maintenance free, long life power systems, and are of significant value to NASA and the community.

  2. Beam test performance and simulation of prototypes for the ALICE silicon pixel detector

    International Nuclear Information System (INIS)

    Conrad, J.; Anelli, G.; Antinori, F.

    2007-01-01

    The silicon pixel detector (SPD) of the ALICE experiment in preparation at the Large Hadron Collider (LHC) at CERN is designed to provide the precise vertex reconstruction needed for measuring heavy flavor production in heavy ion collisions at very high energies and high multiplicity. The SPD forms the innermost part of the Inner Tracking System (ITS) which also includes silicon drift and silicon strip detectors. Single assembly prototypes of the ALICE SPD have been tested at the CERN SPS using high energy proton/pion beams in 2002 and 2003. We report on the experimental determination of the spatial precision. We also report on the first combined beam test with prototypes of the other ITS silicon detector technologies at the CERN SPS in November 2004. The issue of SPD simulation is briefly discussed

  3. Test Beam Results of a 3D Diamond Detector

    CERN Document Server

    Dunser, Marc

    2015-01-01

    3D pixel technology has been used successfully in the past with silicon detectors for tracking applications. Recently, a first prototype of the same 3D technology has been produced on a chemical vapour deposited single-crystal diamond sensor. This device has been subsequently tested in a beam test at CERN’s SPS accelerator in a beam of 120 GeV protons. Details on the production and results of testbeam data are presented.

  4. Luminosity Measurement at ATLAS Development, Construction and Test of Scintillating Fibre Prototype Detectors

    CERN Document Server

    Ask, S; Braem, André; Cheiklali, C; Efthymiopoulos, I; Fournier, D; de La Taille, C; Di Girolamo, B; Grafström, P; Joram, C; Haguenauer, Maurice; Hedberg, V; Lavigne, B; Maio, A; Mapelli, A; Mjörnmark, U; Puzo, P; Rijssenbeek, M; Santos, J; Saraiva, J G; Stenzel, H; Thioye, M; Valladolid, E; Vorobel, V

    2006-01-01

    We are reporting about a scintillating fibre tracking detector which is proposed for the precise determination of the absolute luminosity of the CERN LHC at interaction point 1 where the ATLAS experiment is located. The detector needs to track protons elastically scattered under $\\mu$rad angles in direct vicinity to the LHC beam. It is based on square shaped scintillating plastic fibres read out by multi-anode photomultiplier tubes and is housed in Roman Pots. We describe the design and construction of prototype detectors and the results of a beam test experiment at DESY. The excellent detector performance established in this test validates the detector design and supports the feasibility of the proposed challenging method of luminosity measurement.

  5. Design, prototyping, and testing of a compact superconducting double quarter wave crab cavity

    Science.gov (United States)

    Xiao, Binping; Alberty, Luis; Belomestnykh, Sergey; Ben-Zvi, Ilan; Calaga, Rama; Cullen, Chris; Capatina, Ofelia; Hammons, Lee; Li, Zenghai; Marques, Carlos; Skaritka, John; Verdu-Andres, Silvia; Wu, Qiong

    2015-04-01

    We proposed a novel design for a compact superconducting crab cavity with a double quarter wave (DQWCC) shape. After fabrication and surface treatments, this niobium proof-of-principle cavity was tested cryogenically in a vertical cryostat. The cavity is extremely compact yet has a low frequency of 400 MHz, an essential property for service in the Large Hadron Collider luminosity upgrade. The cavity's electromagnetic properties are well suited for this demanding task. The demonstrated deflecting voltage of 4.6 MV is well above the required 3.34 MV for a crab cavity in the future High Luminosity LHC. In this paper, we present the design, prototyping, and results from testing the DQWCC.

  6. Design, prototyping, and testing of a compact superconducting double quarter wave crab cavity

    Directory of Open Access Journals (Sweden)

    Binping Xiao

    2015-04-01

    Full Text Available We proposed a novel design for a compact superconducting crab cavity with a double quarter wave (DQWCC shape. After fabrication and surface treatments, this niobium proof-of-principle cavity was tested cryogenically in a vertical cryostat. The cavity is extremely compact yet has a low frequency of 400 MHz, an essential property for service in the Large Hadron Collider luminosity upgrade. The cavity’s electromagnetic properties are well suited for this demanding task. The demonstrated deflecting voltage of 4.6 MV is well above the required 3.34 MV for a crab cavity in the future High Luminosity LHC. In this paper, we present the design, prototyping, and results from testing the DQWCC.

  7. Prototype Theory Based Feature Representation for PolSAR Images

    OpenAIRE

    Huang Xiaojing; Yang Xiangli; Huang Pingping; Yang Wen

    2016-01-01

    This study presents a new feature representation approach for Polarimetric Synthetic Aperture Radar (PolSAR) image based on prototype theory. First, multiple prototype sets are generated using prototype theory. Then, regularized logistic regression is used to predict similarities between a test sample and each prototype set. Finally, the PolSAR image feature representation is obtained by ensemble projection. Experimental results of an unsupervised classification of PolSAR images show that our...

  8. Cryogenic tests of the first two LHC quadrupole prototypes

    International Nuclear Information System (INIS)

    Genevey, P.; Deregel, J.; Perot, J.; Rifflet, J.M.; Vedrine, P.; Cortella, J.; Le Coroller, A.

    1994-01-01

    Two LHC (Large Hadron Collider) twin aperture quadrupole prototypes were constructed at CEA Saclay (a CERN-CEA collaboration agreement). Their main characteristics are: 3.05 m length, 56 mm coil aperture, 180 mm between the two apertures, 252 T/m nominal gradient at 15060 A. They have been tested and measured in the 1.8 K Saclay test facility in an horizontal cryostat. The magnets are instrumented in order to investigate their behaviour during cool-down, stand-by, powering and current ramping, quenching and warming-up. A summary of the cryogenic, mechanical, pressure and electrical measurements is presented. The quench protection heaters are efficient down to 3000 A. Losses during ramping up and down are reported. (from authors) 5 fig., 11 ref

  9. Construction and beam-tests of silicon-tungsten prototype modules for the CMS High Granularity Calorimeter for HL-LHC

    Science.gov (United States)

    Quast, Thorben

    2018-02-01

    As part of its HL-LHC upgrade program, CMS is developing a High Granularity Calorimeter (HGCAL) to replace the existing endcap calorimeters. The HGCAL will be realised as a sampling calorimeter, including an electromagnetic compartment comprising 28 layers of silicon pad detectors with pad areas of 0.5-1.0 cm2 interspersed with absorbers. Prototype modules, based on 6-inch hexagonal silicon pad sensors with 128 channels, have been constructed and include many of the features required for this challenging detector. In 2016, beam tests of sampling configurations made from these modules have been conducted both at FNAL and at CERN using the Skiroc2 front-end ASIC (designed by the CALICE collaboration for ILC). In 2017, the setup has been extended with CALICE's AHCAL prototype, a scinitillator based sampling calorimeter, and it was further tested in dedicated beam tests at CERN. There, the new Skiroc2-CMS front-end ASIC was used for the first time. We highlight final results from our studies in 2016, including position resolution as well as precision timing-measurements. Furthermore, the extended setup in 2017 is discussed and first results from beam tests with electrons and pions are shown.

  10. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3

  11. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 8 discusses Control System SOT Tests Results and Analysis Report. This is a continuation of Book 7

  12. Results from a data acquisition system prototype project using a switch-based event builder

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.; Andresen, J.; Barsotti, E.; Baumbaugh, A.; Esterline, D.; Knickerbocker, K.; Kwarciany, R.; Moore, G.; Patrick, J.; Swoboda, C.; Treptow, K.; Trevizo, O.; Urish, J.; VanConant, R.; Walsh, D. (Fermi National Accelerator Lab., Batavia, IL (United States)); Bowden, M.; Booth, A. (Superconducting Super Collider Lab., Dallas, TX (United States)); Cancelo, G. (La Plata Univ. Nacional (Argentina))

    1991-11-01

    A prototype of a high bandwidth parallel event builder has been designed and tested. The architecture is based on a simple switching network and is adaptable to a wide variety of data acquisition systems. An eight channel system with a peak throughput of 160 Megabytes per second has been implemented. It is modularly expandable to 64 channels (over one Gigabyte per second). The prototype uses a number of relatively recent commercial technologies, including very high speed fiber-optic data links, high integration crossbar switches and embedded RISC processors. It is based on an open architecture which permits the installation of new technologies with little redesign effort. 5 refs., 6 figs.

  13. Results from a data acquisition system prototype project using a switch-based event builder

    International Nuclear Information System (INIS)

    Black, D.; Andresen, J.; Barsotti, E.; Baumbaugh, A.; Esterline, D.; Knickerbocker, K.; Kwarciany, R.; Moore, G.; Patrick, J.; Swoboda, C.; Treptow, K.; Trevizo, O.; Urish, J.; VanConant, R.; Walsh, D.; Bowden, M.; Booth, A.; Cancelo, G.

    1991-11-01

    A prototype of a high bandwidth parallel event builder has been designed and tested. The architecture is based on a simple switching network and is adaptable to a wide variety of data acquisition systems. An eight channel system with a peak throughput of 160 Megabytes per second has been implemented. It is modularly expandable to 64 channels (over one Gigabyte per second). The prototype uses a number of relatively recent commercial technologies, including very high speed fiber-optic data links, high integration crossbar switches and embedded RISC processors. It is based on an open architecture which permits the installation of new technologies with little redesign effort. 5 refs., 6 figs

  14. Test of a 32-channel Prototype ASIC for Photon Counting Application.

    Science.gov (United States)

    Chen, Y; Cui, Y; O'Connor, P; Seo, Y; Camarda, G S; Hossain, A; Roy, U; Yang, G; James, R B

    2015-01-01

    A new low-power application-specific integrated circuit (ASIC) for Cadmium Zinc Telluride (CZT) detectors for single-photon emission computed tomography (SPECT) application is being developed at BNL. As the first step, a 32-channel prototype ASIC was designed and tested recently. Each channel has a preamplifier followed by CR-RC 3 shaping circuits and three independent energy bins with comparators and 16-bit counters. The ASIC was fabricated with TSMC 0.35-μm complementary metal-oxide-semiconductor (CMOS) process and tested in laboratories. The power consumption is around 1 mW/ch with a 2.5-V supply. With a gain of 400 mV/fC and the peaking time of 500 ns, the equivalent noise charge (ENC) of 360 e- has been measured in room temperature while the crosstalk rate is less than 0.3%. The 10-bit DACs for global thresholds have an integral nonlinearity (INL) less than 0.56% and differential nonlinearity (DNL) less than 0.33%. In the presentation, we will report the detailed test results with this ASIC.

  15. Preliminary results of a test of a longitudinal phase-space monitor

    International Nuclear Information System (INIS)

    Kikutani, Eiji; Funakoshi, Yoshihiro; Kawamoto, Takashi; Mimashi, Toshihiro

    1994-01-01

    A prototype of a longitudinal phase-space monitor has been developed in TRISTAN Main Ring at KEK. The principle of the monitor and its basic components are explained. Also a result of a preliminary beam test is given. (author)

  16. Beam test results of STS prototype modules for the future accelerator experiments FAIR/CBM and NICA/MPD projects

    Directory of Open Access Journals (Sweden)

    Kharlamov Petr

    2017-01-01

    Full Text Available High-energy heavy-ion collision experiments provide the unique possibility to create and investigate extreme states of strongly-interacted matter and address the fundamental aspects of QCD. The experimental investigation the QCD phase diagram would be a major breakthrough in our understanding of the properties of nuclear matter. The reconstruction of the charged particles created in the nuclear collisions, including the determination of their momenta, is the central detection task in high-energy heavy-ion experiments. It is taken up by the Silicon Tracking System in CBM@FAIR and by Inner Tracker in MPD@NICA currently under development. These experiments requires very fast and radiation hard detectors, a novel data read-out and analysis concept including free streaming front-end electronics. Thermal and beam tests of prototype detector modules for these tracking systems showed the stability of sensors and readout electronics operation.

  17. Development and test of the readout system for the CBM-MVD prototype

    Energy Technology Data Exchange (ETDEWEB)

    Milanovic, Borislav; Neuman, Bertram; Wiebusch, Michael; Amar-Youcef, Samir; Froehlich, Ingo; Stroth, Joachim [Institut fuer Kernphysik, Goethe-Universitaet Frankfurt, Frankfurt am Main (Germany); Collaboration: CRESST-Collaboration; CBM-MVD Collaboration

    2013-07-01

    The CBM Experiment at FAIR aims towards better understanding of the QCD phase-diagram and in-medium properties of matter under high densities. In order to enhance the detection of rare probes via their secondary decay vertices and to support the primary tracking system, the CBM Micro Vertex Detector (MVD) is foreseen. Recently, the MVD Prototype has been developed at the IKF in Frankfurt. The module contains one quarter of the first MVD station featuring four prototype-sensors MIMOSA-26 AHR thinned down to 50 μ m. The prototype has been tested at the CERN SPS accelerator with high energetic pions in November 2012. This contribution discusses the stability and scalability of the DAQ, slow-control and monitoring routines during the beamtime, as well as sensor behavior under high load of up to 700 000 particles per second. The readout system partially uses hardware from the HADES detector which will also run at FAIR. Readout rates of 98 MB/s at the limit of gigabit ethernet have been achieved showing no sign of data loss or corruption.

  18. Preliminary Results on New Prototypes of Precision Rh-0.5at%Fe Resistance Thermometers of Chinese Production

    Science.gov (United States)

    Pavese, F.; Szmyrka-Grzebyk, A.; Lipinski, L.; Manuszkiewicz, H.; Qiu, Ping; Zhang, Jin Tao; Lin, Peng; Li, Xing Wei

    2008-02-01

    Given the practical impossibility of obtaining new precision Rh-0.5at%Fe resistance thermometers in recent years, the possible re-starting of the production of such thermometers in Yunnan (China) was explored by Istituto Nazionale di Ricerca Metrologica (INRIM). Ten prototypes of the new production were made available in early 2006. The paper reports the preliminary data from the testing performed to date on these prototypes at National Institute of Metrology (NIM) and Instytut Niskich Temperatur i Badan Strukturalnych (INTiBS). Although a problem with the alloy composition was detected, the reproducibility results on thermal cycling are very encouraging. Resistance-temperature ( R- T) characteristics below 30 K, though not identical with those of similar thermometers formerly available from Tinsley and VNIIFTRI, are still suitable for accurate metrology.

  19. Brain-muscle-computer interface: mobile-phone prototype development and testing.

    Science.gov (United States)

    Vernon, Scott; Joshi, Sanjay S

    2011-07-01

    We report prototype development and testing of a new mobile-phone-based brain-muscle-computer interface for severely paralyzed persons, based on previous results from our group showing that humans may actively create specified power levels in two separate frequency bands of a single surface electromyography (sEMG) signal. EMG activity on the surface of a single face muscle site (auricularis superior) is recorded with a standard electrode. This analog electrical signal is imported into an Android-based mobile phone and digitized via an internal A/D converter. The digital signal is split, and then simultaneously filtered with two band-pass filters to extract total power within two separate frequency bands. The user-modulated power in each frequency band serves as two separate control channels for machine control. After signal processing, the Android phone sends commands to external devices via a Bluetooth interface. Users are trained to use the device via visually based operant conditioning, with simple cursor-to-target activities on the phone screen. The mobile-phone prototype interface is formally evaluated on a single advanced Spinal Muscle Atrophy subject, who has successfully used the interface in his home in evaluation trials and for remote control of a television. Development of this new device will not only guide future interface design for community use, but will also serve as an information technology bridge for in situ data collection to quantify human sEMG manipulation abilities for a relevant population.

  20. Quality assessment in in vivo NMR spectroscopy: V. Multicentre evaluation of prototype test objects and protocols for performance assessment in small bore MRS equipment

    DEFF Research Database (Denmark)

    Howe, F.A.; Canese, R; Podo, F

    1995-01-01

    This paper reports the results of multicentre studies aimed at designing, constructing, and evaluating prototype test objects for performance assessment in small-bore MRS systems, by utilizing the test protocols already proposed by the EEC COMAC-BME Concerted Action for clinical MRS equipment...... using ISIS as volume localization sequence in 31P MRS. The results suggested the interest of adopting some of these prototypes for improving the comparison of spectroscopy data obtained from different sites, for providing useful means of quality assurance in experimental MRS, and facilitating....... Three classes of test objects were considered: (1) a multicompartment test object for 31P MRS measurements performed with slice-selective sequences; (2) a two-compartment test object for volume-selection 1H MRS; and (3) two-compartment test objects for assessing the performance of experimental systems...

  1. Next-generation avionics packaging and cooling 'test results from a prototype system'

    Science.gov (United States)

    Seals, J. D.

    The author reports on the design, material characteristics, and test results obtained under the US Air Force's advanced aircraft avionics packaging technologies (AAAPT) program, whose charter is to investigate new designs and technologies for reliable packaging, interconnection, and thermal management. Under this program, AT&T Bell Laboratories has completed the preliminary testing of and is evaluating a number of promising materials and technologies, including conformal encapsulation, liquid flow-through cooling, and a cyanate ester backplane. A fifty-two module system incorporating these and and other technologies has undergone preliminary cooling efficiency, shock, sine and random vibration, and maintenance testing. One of the primary objectives was to evaluate the interaction compatibility of new materials and designs with other components in the system.

  2. Prototype tests on the ion source power supplies of the TEXTOR NI-system

    International Nuclear Information System (INIS)

    Goll, O.; Braunsberger, U.; Schwarz, U.

    1987-01-01

    The PINI ion source for the TEXTOR neutral injector is fed by a new modular transistorized power supply. All modules are located in a high voltage cage on 55 kV dc against ground. The normal operation of the injectors includes frequent grid breakdowns causing transient high voltage stresses on the ion source power supplies. These stresses must not disturb the safe operation of the power supplies. The paper describes the set up for extensive testing of a supply prototype module under the expected operating conditions. The main features of this test program are reviewed and the measures taken for a safe operation are discussed. As a result of the investigations, recommendations for the installation of the power supplies at the TEXTOR NI system are given

  3. Full-Scale Hollow Fiber Spacesuit Water Membrane Evaporator Prototype Development and Testing for Advanced Spacesuits

    Science.gov (United States)

    Bue, Grant; Trevino, Luis; Tsioulos, Gus; Mitchell, Keith; Dillon, Paul; Weaver, Gregg

    2009-01-01

    The spacesuit water membrane evaporator (SWME) is being developed to perform the thermal control function for advanced spacesuits to take advantage of recent advances in micropore membrane technology in providing a robust heat-rejection device that is potentially less sensitive to contamination than is the sublimator. Principles of a sheet membrane SWME design were demonstrated using a prototypic test article that was tested in a vacuum chamber at JSC in July 1999. The Membrana Celgard X50-215 microporous hollow fiber (HoFi) membrane was selected after recent contamination tests as the superior candidate among commercial alternatives for HoFi SWME prototype development. Although a number of design variants were considered, one that grouped the fiber layers into stacks, which were separated by small spaces and packaged into a cylindrical shape, was deemed best for further development. An analysis of test data showed that eight layer stacks of the HoFi sheets that had good exposure on each side of the stack would evaporate water with high efficiency. A design that has 15,000 tubes, with 18 cm of exposed tubes between headers has been built and tested that meets the size, weight, and performance requirements of the SWME. This full-scale prototype consists of 30 stacks, each of which are formed into a chevron shape and separated by spacers and organized into three sectors of ten nested stacks. Testing has been performed to show contamination resistance to the constituents expected to be found in potable water produced by the distillation processes. Other tests showed the sensitivity to surfactants.

  4. Prototyping and tests for an MRPC-based time-of-flight detector for 1 GeV neutrons

    Energy Technology Data Exchange (ETDEWEB)

    Yakorev, D. [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); Aumann, T. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Technische Universitaet Darmstadt (Germany); Bemmerer, D., E-mail: d.bemmerer@hzdr.de [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); Boretzky, K. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Caesar, C. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Technische Universitaet Darmstadt (Germany); Ciobanu, M. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Cowan, T.; Elekes, Z. [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); Elvers, M. [Universitaet zu Koeln (Germany); Gonzalez Diaz, D. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Technische Universitaet Darmstadt (Germany); Tsinghua University, Beijing (China); Hannaske, R. [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); Hehner, J.; Heil, M. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Kempe, M. [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); Maroussov, V. [Universitaet zu Koeln (Germany); Nusair, O. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Al Balqa' Applied University, Salt (Jordan); Simon, H. [GSI Helmholtz zentrum fuer Schwerionenforschung, Darmstadt (Germany); Sobiella, M.; Stach, D.; Wagner, A. [Helmholtz-Zentrum Dresden-Rossendorf (HZDR), Dresden (Germany); and others

    2011-10-21

    The NeuLAND detector at the R{sup 3}B experiment at the future FAIR facility in Darmstadt aims to detect fast neutrons (0.2-1.0 GeV) with high time and spatial resolutions ({sigma}{sub t}<100ps,{sigma}{sub x,y,z}<1cm). This task can be performed either with a scintillator or based on the multigap resistive plate chamber (MRPC) technology. Here, prototyping and test for an MRPC-based solution are discussed. In order to reach 90% detection efficiency, the final detector must consist of 50 consecutive MRPC stacks. Each stack contains a 4 mm thick anode made of iron converter material, with an additional 4 mm of converter material between two stacks. The secondary charged particles stemming from hadronic interactions of the high energetic neutrons in the converter will be detected in the MRPCs. As part of the ongoing development effort, a number of prototypes for this detector have been developed and built. They have been tested in experiments with a single-electron beam with picosecond resolution at the superconducting linac ELBE (Dresden, Germany). The results of the tests are presented here, and an outlook is given.

  5. Standardized performance tests of collectors of solar thermal energy: Prototype moderately concentrating grooved collectors

    Science.gov (United States)

    1976-01-01

    Prototypes of moderately concentrating grooved collectors were tested with a solar simulator for varying inlet temperature, flux level, and incident angle. Collector performance is correlated in terms of inlet temperature and flux level.

  6. Tests of a Roman Pot Prototype for the TOTEM Experiment

    OpenAIRE

    Deile, M.; Alagoz, E.; Anelli, G.M.; Antchev, G.A.; Ayache, M.; Caspers, F.; Dimovasili, E.; Dinapoli, R.; Drouhin, F.D.; Eggert, K.; Escourrou, L.; Fochler, O.; Gill, K.; Grabit, R.; Haug, F.

    2005-01-01

    The TOTEM collaboration has developed and tested the first prototype of its Roman Pots to be operated in the LHC. TOTEM Roman Pots contain stacks of 10 silicon detectors with strips oriented in two orthogonal directions. To measure proton scattering angles of a few microradians, the detectors will approach the beam centre to a distance of 10 sigma + 0.5 mm (= 1.3 mm). Dead space near the detector edge is minimised by using two novel "edgeless" detector technologies. The silicon detectors are ...

  7. Systematic and Iterative Development of a Smartphone App to Promote Sun-Protection Among Holidaymakers: Design of a Prototype and Results of Usability and Acceptability Testing.

    Science.gov (United States)

    Rodrigues, Angela M; Sniehotta, Falko F; Birch-Machin, Mark A; Olivier, Patrick; Araújo-Soares, Vera

    2017-06-12

    Sunburn and intermittent exposure to ultraviolet rays are risk factors for melanoma. Sunburn is a common experience during holidays, making tourism settings of particular interest for skin cancer prevention. Holidaymakers are a volatile populations found at different locations, which may make them difficult to reach. Given the widespread use of smartphones, evidence suggests that this might be a novel, convenient, scalable, and feasible way of reaching the target population. The main objective of this study was to describe and appraise the process of systematically developing a smartphone intervention (mISkin app) to promote sun-protection during holidays. The iterative development process of the mISkin app was conducted over four sequential stages: (1) identify evidence on the most effective behavior change techniques (BCTs) used (active ingredients) as well as theoretical predictors and theories, (2) evidence-based intervention design, (3) co-design with users of the mISkin app prototype, and (4) refinement of the app. Each stage provided key findings that were subsequently used to inform the design of the mISkin app. The sequential approach to development integrates different strands of evidence to inform the design of an evidence-based intervention. A systematic review on previously tested interventions to promote sun-protection provided cues and constraints for the design of this intervention. The development and design of the mISkin app also incorporated other sources of information, such as other literature reviews and experts' consultations. The developed prototype of the mISkin app was evaluated by engaging potential holidaymakers in the refinement and further development of the mISkin app through usability (ease-of-use) and acceptability testing of the intervention prototype. All 17 participants were satisfied with the mISkin prototype and expressed willingness to use it. Feedback on the app was integrated in the optimization process of the mISkin app

  8. Development and test of prototype components for ITER

    International Nuclear Information System (INIS)

    Biel, Wolfgang; Behr, Wilfried; Castano-Bardawil, David

    2015-08-01

    The scientific program of the project is divided into the following partial projects: (1.) ITER Diagnostic Port Plug for the charge-exchange spectroscopy (CXRS) with the subthemes: (a) Development of prototypes for critical mechanical components, (b) development of a roboter for the laser welding of vacuum seals and pipings at the Port Plug, (c) mirror studies, (d) CXRS prototype spectrometer, (2.) ITER tritium retention diagnostics (TR), (3.) ITER disruption mitigation ventile (DMV).

  9. Experimentation of a LiBr–H2O absorption process for long-term solar thermal storage: Prototype design and first results

    International Nuclear Information System (INIS)

    N'Tsoukpoe, K.E.; Le Pierrès, N.; Luo, L.

    2013-01-01

    The long-term thermal storage by absorption process studied in this paper is devoted to building heating. A demonstrative prototype that can store 8 kWh of heat and produce a heating power of 1 kW has been designed and built. It has been tested in static and dynamic operating conditions, which are compatible with domestic solar thermal and heating plants. The process operating principle, the prototype design and first experimental results are presented and discussed in this contribution. The charging process has been proved successful. The observed power during the charging phases is satisfactory, according to the process design for a real plant (2–5 kW). Absorption during discharging phase is also verified. Discharging tests show that absorption operates in conditions that could allow house heating as the absorber outlet solution temperature can reach 40 °C. However, some problems related to the absorber design have not allowed observing the heat recovery by the heat transfer fluid as expected. Some avenues are explored prior to a new and more appropriate design and eventually a new operating mode. Various aspects such as the use of a heat and mass transfer enhancement additive and stratification in the solution storage tank have also been addressed. - Highlights: ► A long-term thermal storage prototype is tested under practical conditions. ► For the prototype design, a separate reactor is used with integrated components. ► The observed powers during the charging phases are satisfactory (2–5 kW). ► Following crystallisation phases, discharging tests enabled the crystal dissolution. ► Absorber temperature that could allow house heating (up to 40°C) has been observed

  10. Computer Aided Analysis and Prototype Testing of an Improved Biogas Reactor For Biomass System

    Directory of Open Access Journals (Sweden)

    Jeremy (Zheng Li

    2015-05-01

    Full Text Available The alternative fuel resources substituting for conventional fuels are required due to less availability of fuel resources than demand in the market. A large amount of crude oil and petroleum products are required to be imported in many countries over the world. Also the environmental pollution is another serious problem when use petroleum products. Biogas, with the composition of 54.5% CH4, 39.5% CO2, and 6% other elements (i.e., H2, N2, H2S, and O2, is a clear green fuel that can substitute the regular petroleum fuels to reduce the pollutant elements. Biogas can be produced by performing enriching, scrubbing, and bottling processes. The purification process can be further applied to take away the pollutants in biogas. The pure biogas process analyzed in this research is compressed to 2950 psi while being filled into gas cylinder. The daily produced biogas capacity is around 5480 ft3 and the processing efficacy is affected by surrounding environment and other factors. The design and development of this biogas system is assisted through mathematical analysis, 3D modeling, computational simulation, and prototype testing. Both computer aided analysis and prototype testing show close results which validate the feasibility of this biogas system in biomass applications.

  11. Collaborative Simulation and Testing of the Superconducting Dipole Prototype Magnet for the FAIR Project

    International Nuclear Information System (INIS)

    Zhu Yinfeng; Zhu Zhe; Wu Weiyue; Xu Houchang

    2012-01-01

    The superconducting dipole prototype magnet of the collector ring for the Facility for Antiproton and Ion Research (FAIR) is an international cooperation project. The collaborative simulation and testing of the developed prototype magnet is presented in this paper. To evaluate the mechanical strength of the coil case during quench, a 3-dimensional (3D) electromagnetic (EM) model was developed based on the solid97 magnetic vector element in the ANSYS commercial software, which includes the air region, coil and yoke. EM analysis was carried out with a peak operating current at 278 A. Then, the solid97 element was transferred into the solid185 element, the coupled analysis was switched from electromagnetic to structural, and the finite element model for the coil case and glass-fiber reinforced composite (G10) spacers was established by the ANSYS Parametric Design Language based on the 3D model from the CATIA V5 software. However, to simulate the friction characteristics inside the coil case, the conta173 surface-to-surface contact element was established. The results for the coil case and G10 spacers show that they are safe and have sufficient strength, on the basis of testing in discharge and quench scenarios. (fusion engineering)

  12. MRPC prototypes for NeuLAND tested using the single electron mode of ELBE/Dresden

    Energy Technology Data Exchange (ETDEWEB)

    Yakorev, Dmitry; Bemmerer, Daniel; Elekes, Zoltan; Kempe, Mathias; Stach, Daniel; Wagner, Andreas [Forschungszentrum Dresden-Rossendorf (FZD), Dresden (Germany); Aumann, Tom; Boretzky, Konstanze; Caesar, Christoph; Ciobanu, Mircea; Hehner, Joerg; Heil, Michael; Nusair, Omar; Reifarth, Rene; Simon, Haik [GSI, Darmstadt (Germany); Elvers, Michael; Maroussov, Vassili; Zilges, Andreas [Universitaet Koeln (Germany); Zuber, Kai [TU Dresden (Germany)

    2010-07-01

    The NeuLAND detector at the R{sup 3}B experiment at the future FAIR facility in Darmstadt aims to detect fast neutrons (0.2-1.0 GeV) with high time and spatial resolutions ({sigma}{sub t}<100 ps, {sigma}{sub x,y,z}<1 cm). Prototypes for the NeuLAND detector have been built at FZD and GSI and then studied using the 32 MeV pulsed electron beam at the superconducting electron accelerator ELBE in Dresden, Germany. Owing to the new, single-electron per bunch mode of operation, a rapid validation of the design criteria ({>=}90% efficiency for minimum ionizing particles, {sigma} {<=} 100 ps time resolution) was possible. Tested properties of the prototypes include glass thickness, spacing of the central anode, and a comparison of single-ended and differential readout. Tested frontend electronics schemes include FOPI (single-ended), PADI-based (both single-ended and differential mode tested), and ALICE (differential).

  13. Benchmarking Evaluation Results for Prototype Extravehicular Activity Gloves

    Science.gov (United States)

    Aitchison, Lindsay; McFarland, Shane

    2012-01-01

    The Space Suit Assembly (SSA) Development Team at NASA Johnson Space Center has invested heavily in the advancement of rear-entry planetary exploration suit design but largely deferred development of extravehicular activity (EVA) glove designs, and accepted the risk of using the current flight gloves, Phase VI, for unique mission scenarios outside the Space Shuttle and International Space Station (ISS) Program realm of experience. However, as design reference missions mature, the risks of using heritage hardware have highlighted the need for developing robust new glove technologies. To address the technology gap, the NASA Game-Changing Technology group provided start-up funding for the High Performance EVA Glove (HPEG) Project in the spring of 2012. The overarching goal of the HPEG Project is to develop a robust glove design that increases human performance during EVA and creates pathway for future implementation of emergent technologies, with specific aims of increasing pressurized mobility to 60% of barehanded capability, increasing the durability by 100%, and decreasing the potential of gloves to cause injury during use. The HPEG Project focused initial efforts on identifying potential new technologies and benchmarking the performance of current state of the art gloves to identify trends in design and fit leading to establish standards and metrics against which emerging technologies can be assessed at both the component and assembly levels. The first of the benchmarking tests evaluated the quantitative mobility performance and subjective fit of four prototype gloves developed by Flagsuit LLC, Final Frontier Designs, LLC Dover, and David Clark Company as compared to the Phase VI. All of the companies were asked to design and fabricate gloves to the same set of NASA provided hand measurements (which corresponded to a single size of Phase Vi glove) and focus their efforts on improving mobility in the metacarpal phalangeal and carpometacarpal joints. Four test

  14. 19 CFR 10.91 - Prototypes used exclusively for product development and testing.

    Science.gov (United States)

    2010-04-01

    ... following use—(1) Sale. Prototypes or any part(s) of prototypes, after having been used for the purposes for...) of this section; and a detailed description of the condition of the prototype following use for the... and the date of execution. (d) Prototypes not sold following use. As to those prototypes or parts of...

  15. Field evaluation of prototype electrofibrous filters

    International Nuclear Information System (INIS)

    Kuhl, W.D.; Bergman, W.; Biermann, A.H.; Lum, B.Y.

    1982-01-01

    New prototype electrofibrous filters were designed, built and evaluated in laboratory tests and in field installations. Two prototypes were designed for use in nuclear ventilation ducts as prefilters to HEPA filters. One prototype is designed to be a permanent component of the ventilation system while the other is a disposable unit. The disposable electrofibrous prefilter was installed in the exhaust stream of a glove box in which barrels of uranium turnings are burned. Preliminary tests show the disposal prefilter is effectively prolonging the HEPA filter life. An earlier prototype of the rolling prefilter was upgraded to meet the increased requirements for installation in a nuclear facility. This upgraded prototype was evaluated in the fire test facility at LLNL and shown to be effective in protecting HEPA filters from plugging under the most severe smoke conditions. The last prototype described in this report is a recirculating air filter. After demonstrating a high performance in laboratory tests the unit was shipped to Savannah River where it is awaiting installation in a Pu fuel fabrication facility. An analysis of the particulate problem in Savannah River indicates that four recirculating air filter will save $172,000 per year in maintenance costs

  16. R&D on high-power dc reactor prototype for ITER poloidal field converter

    Energy Technology Data Exchange (ETDEWEB)

    Li, Chuan [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, Huazhong University of Science and Technology, Wuhan 430074 (China); School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Song, Zhiquan; Fu, Peng [Institute of Plasma Physics, Chinese Academy of Science, Hefei 230031 (China); Zhang, Ming, E-mail: zhangming@hust.edu.cn [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, Huazhong University of Science and Technology, Wuhan 430074 (China); School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Yu, Kexun [State Key Laboratory of Advanced Electromagnetic Engineering and Technology, Huazhong University of Science and Technology, Wuhan 430074 (China); School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Qin, Xiuqi [School of Electrical Engineering and Automation, Hefei University of Technology, Hefei 230009 (China)

    2015-10-15

    Highlights: • A new prototype design structure of dry-type air-core water-cooling reactor with epoxy resin casting technique is presented. • Theoretical analysis, finite-element simulation and prototype test verification are applied on the design. • The results of temperature rise and transient fault current test of prototypes are introduced and analyzed. • The success of tests demonstrates that the proposed structure is of high reliability and availability. - Abstract: This paper mainly introduces the research and development (R&D) of the high-power dc reactor prototype, whose functions are to limit the circulating current and ripple current in the ITER poloidal field (PF) converter. It needs to operate at rated large direct current 27.5 kA and withstand peak fault current up to 175 kA. Therefore, in order to meet the special requirements of the dynamic and thermal stability, a new prototype design structure of dry-type air-core water-cooling reactor with epoxy resin casting technique is presented, which is based on the theoretical analysis, finite-element simulation calculation and small prototype test verification. Now the full prototype has been fabricated by China industry, and the dynamic and thermal stability tests of the prototype have also been accomplished successfully. The test results are in compliance with the design and it shows the availability and feasibility of the proposed design, which may be a reference for relevant applications.

  17. Status of prototype rupture disc testing in the large leak test rig

    International Nuclear Information System (INIS)

    Amos, J.C.

    1979-09-01

    The prototype CRBRP double membrane rupture disc assembly is being performance tested in conjunction with the LLTR Series II Large Leak Program. In May 1979, the double membrane disc assembly was inadvertently activated during sodium system pressure instrument calibration. This experience indicated that the rupture disc burst at essentially the design burst pressure when a gradually increasing state pressure was applied. The area of membrane opening was found to be about 25 to 30% of the cross-sectional area. In July 1979, the disc assembly was again tested (this time in a single membrane configuration) in conjunction with the first LLTR Series II Test A-1a (inert gas injection). Test data indicated that the disc burst in about 35 ms at essentially the design burst pressure with an opening of about 30% of the cross-sectional area. The pressure immediately downstream of the disc dropped below atmospheric pressure following the rupture tube event (releasing high pressure nitrogen into sodium) for about 1.5 seconds before increasing to a maximum of 30 psig. This behavior raises a question on the adequacy of a downstream pressure device for rapid sensing of disc rupture and initiating plant shutdown following a large SWR event. 14 figures

  18. Hover Testing of the NASA/Army/MIT Active Twist Rotor Prototype Blade

    Science.gov (United States)

    Wilbur, Matthew L.; Yeager, William T., Jr.; Wilkie, W. Keats; Cesnik, Carlos E. S.; Shin, Sangloon

    2000-01-01

    Helicopter rotor individual blade control promises to provide a mechanism for increased rotor performance and reduced rotorcraft vibrations and noise. Active material methods, such as piezoelectrically actuated trailing-edge flaps and strain-induced rotor blade twisting, provide a means of accomplishing individual blade control without the need for hydraulic power in the rotating system. Recent studies have indicated that controlled strain induced blade twisting can be attained using piezoelectric active fiber composite technology. In order to validate these findings experimentally, a cooperative effort between NASA Langley Research Center, the Army Research Laboratory, and the MIT Active Materials and Structures Laboratory has been developed. As a result of this collaboration an aeroelastically-scaled active-twist model rotor blade has been designed and fabricated for testing in the heavy gas environment of the Langley Transonic Dynamics Tunnel (TDT). The results of hover tests of the active-twist prototype blade are presented in this paper. Comparisons with applicable analytical predictions of active-twist frequency response in hovering flight are also presented.

  19. A new surface treatment for the prototype Rcs of the BESIII spectrometer

    International Nuclear Information System (INIS)

    Zhang Jiawen; Du Zizhen; Han Jifeng; Li Jiancheng; Li Rubai; Liu Qian; Qian, Sen; Wang Yifang; Xie Yigang; Xie Yuguang; Zhao Jianbin; Min Fasu; Zhao Haiquan; Zhao, T.

    2005-01-01

    The prototype resistive plate chambers (RPCs) for the BESIII spectrometer were constructed by using resistive electrodes made from a special type of phenolic paper laminates developed by us. The surface quality of these laminates is superior to other bakelite plates that have been used to construct RPCs elsewhere. A method for adjusting the resistivety of these laminates was also developed. Extensive studies were conducted by using a number of prototype RPCs in the last several years. Tests have shown prototype RPCs made by using our resistive plates without the linseed oil treatment can achieve the level of performance comparable to RPCs with linseed oil treated bakelite or resistive glass electrodes. In this paper, we will discuss the construction of these prototype RPCs. The test results of a prototype RPC that have been monitored for a year will be reported. Based on favorable test results of prototypes, the RPC production for the muon identifier of the BESIII spectrometer has started at the Beijing Gaonengkedi Science and Technology Co. Ltd. in early 2004 using the technology that we developed

  20. Engineering prototypes for theta-pinch devices

    International Nuclear Information System (INIS)

    Hansborough, L.D.; Hammer, C.F.; Hanks, K.W.; McDonald, T.E.; Nunnally, W.C.

    1975-01-01

    Past, present, and future engineering prototypes for theta-pinch plasma-physics devices at Los Alamos Scientific Laboratory are discussed. Engineering prototypes are designed to test and evaluate all components under system conditions expected on actual plasma-physics experimental devices. The importance of engineering prototype development increases as the size and complexity of the plasma-physics device increases. Past experiences with the Scyllac prototype and the Staged Theta-Pinch prototype are discussed and evaluated. The design of the proposed Staged Scyllac prototype and the Large Staged Scyllac implosion prototype assembly are discussed

  1. Comparison of cavitation tests on the SNR 300 prototype sodium pump, carried out using water at room temperature and liquid sodium at 5800C

    International Nuclear Information System (INIS)

    Fakkel, R.H.; Hoornweg, C.J.; Kamerling, B.; Ten Wolde, Tj.; Heslenfeld, M.W.; Mendte, W.K.; Bunjies, J.H.

    1976-01-01

    This paper gives results of tests carried out on a centrifugal pump in both a water and a sodium test facility. The pump tested is a prototype of the primary circulation pumps intended for a LMFBR 300 MWe nuclear power station (the SNR reactor) under construction at Kalkar, West Germany. The pump characteristics under various NPSH-conditions were investigated, and a comparison is made in the paper between the results of cavitation tests using water and liquid sodium. An attempt is made to account for differences in pump characteristics in both types of tests by referring to the physical properties of the liquids used (water and sodium). An attempt is also made to correlate the results obtained with the full-scale prototype to those obtained previously with a half-scale model of the impeller. The various test circuits used should be made identical, in order to avoid that differences in geometry should obscure essential features resulting from using different liquids. Yet, it showed that in this respect, the tests did not obey to this key-rule, reasons why the test results did not fully reveal the essential physical properties of either fluid under cavitating conditions. (author)

  2. Implicit face prototype learning from geometric information.

    Science.gov (United States)

    Or, Charles C-F; Wilson, Hugh R

    2013-04-19

    There is evidence that humans implicitly learn an average or prototype of previously studied faces, as the unseen face prototype is falsely recognized as having been learned (Solso & McCarthy, 1981). Here we investigated the extent and nature of face prototype formation where observers' memory was tested after they studied synthetic faces defined purely in geometric terms in a multidimensional face space. We found a strong prototype effect: The basic results showed that the unseen prototype averaged from the studied faces was falsely identified as learned at a rate of 86.3%, whereas individual studied faces were identified correctly 66.3% of the time and the distractors were incorrectly identified as having been learned only 32.4% of the time. This prototype learning lasted at least 1 week. Face prototype learning occurred even when the studied faces were further from the unseen prototype than the median variation in the population. Prototype memory formation was evident in addition to memory formation of studied face exemplars as demonstrated in our models. Additional studies showed that the prototype effect can be generalized across viewpoints, and head shape and internal features separately contribute to prototype formation. Thus, implicit face prototype extraction in a multidimensional space is a very general aspect of geometric face learning. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. ATLAS Level-1 Calorimeter Trigger Subsystem Tests of a Prototype Cluster Processor Module

    CERN Document Server

    Garvey, J; Apostologlou, P; Ay, C; Barnett, B M; Bauss, B; Brawn, I P; Bohm, C; Dahlhoff, A; Davis, A O; Edwards, J; Eisenhandler, E F; Gee, C N P; Gillman, A R; Hanke, P; Hellman, S; Hidévgi, A; Hillier, S J; Jakobs, K; Kluge, E E; Landon, M; Mahboubi, K; Mahout, G; Meier, K; Meshkov, P; Moye, T H; Mills, D; Moyse, E; Nix, O; Penno, K; Perera, V J O; Qian, W; Schmitt, K; Schäfer, U; Silverstein, S; Staley, R J; Thomas, J; Trefzger, T M; Watkins, P M; Watson, A; 9th Workshop On Electronics For LHC Experiments - LECC 2003

    2003-01-01

    The Level-1 Calorimeter Trigger consists of a Preprocessor (PP), a Cluster Processor (CP), and a Jet/Energy-sum Processor (JEP). The CP and JEP receive digitised trigger-tower data from the Preprocessor and produce trigger multiplicity and Region-of-Interest (RoI) information. The trigger will also provide intermediate results to the data acquisition (DAQ) system for monitoring and diagnostic purposes by using Readout Driver (ROD) Modules. The CP Modules (CPM) are designed to find isolated electron/photon and hadron/tau clusters in overlapping windows of trigger towers. Each pipelined CPM processes 8-bit data from a total of 128 trigger towers at each LHC crossing. Four full-specification prototypes of CPMs have been built and results of complete tests on individual boards will be presented. These modules were then integrated with other modules to build an ATLAS Level-1 Calorimeter Trigger subsystem test bench. Realtime data were exchanged between modules, and time-slice readout data were tagged and transferr...

  4. Factors affecting polyamide prototypes design of Albedo dosemeters

    International Nuclear Information System (INIS)

    Martins, M.M.; Mauricio, C.L.P.; Fonseca, E.S.

    1996-01-01

    This work studies the most important factors which affect the response of albedo neutron dosemeters containing LiF TLDs with the aim to improve their sensitivity. It includes tests of thickness and shape of the polyamide moderator body prototypes, albedo window diameter and TLD position inside the moderator. Analyzing the results, an albedo neutron dosemeter prototype, B 4 C covered, was developed. The prototype has a response three times higher than the albedo dosemeter now in use in Brazil. (author)

  5. A modern and versatile data-acquisition package for calorimeter prototypes test-beams H4DAQ

    CERN Document Server

    Marini, Andrea Carlo

    2017-01-01

    The upgrade of the calorimeters for the HL-LHC or for future colliders requires an extensive programme of tests to qualify different detector prototypes with dedicated test beams. A common data-acquisition system (called H4DAQ) was developed for the H4 test beam line at the North Area of the CERN SPS in 2014 and it has since been adopted by an increasing number of teams involved in the CMS experiment and AIDA groups. Several different calorimeter prototypes and precision timing detectors have used H4DAQ from 2014 to 2017, and it has proved to be a versatile application, portable to many other beam test environments (the CERN beam lines EA-T9 at the PS, H2 and H4 at the SPS, and at the INFN Frascati Beam Test Facility).The H4DAQ is fast, simple, modular and can be configured to support different setups. The different functionalities of the DAQ core software are split into three configurable finite state machines the data readout, run control, and event builder. The distribution of information and data betw...

  6. Test beam results from the prototype L3 silicon microvertex detector

    International Nuclear Information System (INIS)

    Adam, A.; Adriani, O.; Ahlen, S.

    1993-11-01

    We report test beam results on the overall system performance of two modules of the L3 Silicon Microvertex Detector exposed to a 50 GeV pion beam. Each module consists of two AC coupled double-sided silicon strip detectors equipped with VLSI readout electronics. The associated data acquisition system comprises an 8 bit FADC, an optical data transmission circuit, a specialized data reduction processor and a synchronization module. A spatial resolution of 7.5 μm and 14 μm for the two coordinates and a detection efficiency in excess of 99% are measured. (orig.)

  7. PANDA Muon System Prototype

    Science.gov (United States)

    Abazov, Victor; Alexeev, Gennady; Alexeev, Maxim; Frolov, Vladimir; Golovanov, Georgy; Kutuzov, Sergey; Piskun, Alexei; Samartsev, Alexander; Tokmenin, Valeri; Verkheev, Alexander; Vertogradov, Leonid; Zhuravlev, Nikolai

    2018-04-01

    The PANDA Experiment will be one of the key experiments at the Facility for Antiproton and Ion Research (FAIR) which is under construction now in the territory of the GSI Helmholtz Centre for Heavy Ion Research in Darmstadt, Germany. PANDA is aimed to study hadron spectroscopy and various topics of the weak and strong forces. Muon System is chosen as the most suitable technology for detecting the muons. The Prototype of the PANDA Muon System is installed on the test beam line T9 at the Proton Synchrotron (PS) at CERN. Status of the PANDA Muon System prototype is presented with few preliminary results.

  8. PANDA Muon System Prototype

    Directory of Open Access Journals (Sweden)

    Abazov Victor

    2018-01-01

    Full Text Available The PANDA Experiment will be one of the key experiments at the Facility for Antiproton and Ion Research (FAIR which is under construction now in the territory of the GSI Helmholtz Centre for Heavy Ion Research in Darmstadt, Germany. PANDA is aimed to study hadron spectroscopy and various topics of the weak and strong forces. Muon System is chosen as the most suitable technology for detecting the muons. The Prototype of the PANDA Muon System is installed on the test beam line T9 at the Proton Synchrotron (PS at CERN. Status of the PANDA Muon System prototype is presented with few preliminary results.

  9. Construction and beam-tests of silicon-tungsten prototype modules for the CMS High Granularity Calorimeter for HL-LHC

    CERN Document Server

    Quast, Thorben

    2017-01-01

    As part of its HL-LHC upgrade program, CMS is developing a High Granularity Calorimeter (HGCAL) to replace the existing endcap calorimeters. The HGCAL will be realised as a sampling calorimeter, including an electromagnetic compartment comprising 28 layers of silicon pad detectors with pad areas of 0.5 - 1.0 cm$^2$ interspersed with absorbers.Prototype modules, based on 6-inch hexagonal silicon pad sensors with 128 channels, have been constructed and include many of the features required for this challenging detector. In 2016, beam tests of sampling configurations made from these modules have been conducted both at FNAL and at CERN using the Skiroc2 front-end chip (designed for the CALICE experiment for ILC). This year, the setup is extended with CALICE's AHCAL prototype and it is further tested in dedicated beam tests at CERN. There, the new Skiroc2-CMS front-end chip is used for the first time.We present final results from our studies in 2016, including noise performance, calibration with MIPs, energy and p...

  10. Optimizing classroom instruction through self-paced learning prototype

    Directory of Open Access Journals (Sweden)

    Romiro Gordo Bautista

    2015-09-01

    Full Text Available This study investigated the learning impact of self-paced learning prototype in optimizing classroom instruction towards students’ learning in Chemistry. Two sections of 64 Laboratory High School students in Chemistry were used as subjects of the study. The Quasi-Experimental and Correlation Research Design was used in the study: a pre-test was conducted, scored and analyzed which served as the basis in determining the initial learning schema of the respondents. A questionnaire was adopted to find the learning motivation of the students in science. Using Pearson-r correlation, it was found out that there is a highly significant relationship between their internal drive and their academic performance. Moreover, a post-test was conducted after self-paced learning prototype was used in the development of select topics in their curricular plot. It was found out that the students who experienced the self-paced learning prototype performed better in their academic performance as evidenced by the difference of their mean post-test results. ANCOVA results on the post-test mean scores of the respondents were utilized in establishing the causal-effect of the learning prototype to the academic performance of the students in Chemistry. A highly significant effect on their academic performance (R-square value of 70.7% and significant interaction of the models to the experimental grouping and mental abilities of the respondents are concluded in the study.

  11. Functional tests of a prototype for the CMS-ATLAS common non-event data handling framework

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00366910; The ATLAS collaboration; Formica, Andrea

    2017-01-01

    Since 2014 the ATLAS and CMS experiments share a common vision on the database infrastructure for the handling of the non-event data in forthcoming LHC runs. The wide commonality in the use cases has allowed to agree on a common overall design solution that is meeting the requirements of both experiments. A first prototype has been completed in 2016 and has been made available to both experiments. The prototype is based on a web service implementing a REST api with a set of functions for the management of conditions data. In this contribution, we describe this prototype architecture and the tests that have been performed within the CMS computing infrastructure, with the aim of validating the support of the main use cases and of suggesting future improvements.

  12. Development and testing of prototype alpha waste incinerator off-gas systems

    International Nuclear Information System (INIS)

    Freed, E.J.; Becker, G.W.

    1982-01-01

    A test program is in progress at Savannah River Laboratory (SRL) to confirm and develop incinerator design technology for an SRP production Alpha Waste Incinerator (AWI) to be built in the mid-1980's. The Incinerator Components Test Facility (ICTF) is a full-scale (5 kg/h), electrically heated, controlled-air prototype incinerator built to burn nonradioactive solid waste. The incinerator has been operating successfully at SRL since March 1979 and has met or exceeded all design criteria. During the first 1-1/2 years of operation, liquid scrubbers were used to remove particulates and hydrochloric acid from the incinerator exhaust gases. A dry off-gas system is currently being tested to provide data to Savannah River Plant's proposed AWI

  13. Detection of pneumonia associated pathogens using a prototype multiplexed pneumonia test in hospitalized patients with severe pneumonia.

    Directory of Open Access Journals (Sweden)

    Berit Schulte

    Full Text Available Severe pneumonia remains an important cause of morbidity and mortality. Polymerase chain reaction (PCR has been shown to be more sensitive than current standard microbiological methods--particularly in patients with prior antibiotic treatment--and therefore, may improve the accuracy of microbiological diagnosis for hospitalized patients with pneumonia. Conventional detection techniques and multiplex PCR for 14 typical bacterial pneumonia-associated pathogens were performed on respiratory samples collected from adult hospitalized patients enrolled in a prospective multi-center study. Patients were enrolled from March until September 2012. A total of 739 fresh, native samples were eligible for analysis, of which 75 were sputa, 421 aspirates, and 234 bronchial lavages. 276 pathogens were detected by microbiology for which a valid PCR result was generated (positive or negative detection result by Curetis prototype system. Among these, 120 were identified by the prototype assay, 50 pathogens were not detected. Overall performance of the prototype for pathogen identification was 70.6% sensitivity (95% confidence interval (CI lower bound: 63.3%, upper bound: 76.9% and 95.2% specificity (95% CI lower bound: 94.6%, upper bound: 95.7%. Based on the study results, device cut-off settings were adjusted for future series production. The overall performance with the settings of the CE series production devices was 78.7% sensitivity (95% CI lower bound: 72.1% and 96.6% specificity (95% CI lower bound: 96.1%. Time to result was 5.2 hours (median for the prototype test and 43.5 h for standard-of-care. The Pneumonia Application provides a rapid and moderately sensitive assay for the detection of pneumonia-causing pathogens with minimal hands-on time.Deutsches Register Klinischer Studien (DRKS DRKS00005684.

  14. Design, Fabrication, and Testing of a Composite Rack Prototype in Support of the Deep Space Habitat Program

    Science.gov (United States)

    Smith, Russ; Hagen, Richard

    2015-01-01

    In support of the Deep Space Habitat project a number of composite rack prototypes were developed, designed, fabricated and tested to various extents ( with the International Standard Payload Rack configuration, or crew quarters, as a baseline). This paper focuses specifically on a composite rack prototype with a direct tie in to Space Station hardware. The outlined prototype is an all composite construction, excluding metallic fasteners, washers, and their associated inserts. The rack utilizes braided carbon composite tubing for the frame with the sidewalls, backwall and flooring sections utilizing aircraft grade composite honeycomb sandwich panels. Novel additively manufactured thermoplastic joints and tube inserts were also developed in support of this effort. Joint and tube insert screening tests were conducted at a preliminary level. The screening tests allowed for modification, and enhancement, of the fabrication and design approaches, which will be outlined. The initial joint tests did not include mechanical fasteners. Adhesives were utilized at the joint to composite tube interfaces, along with mechanical fasteners during final fabrication (thus creating a stronger joint than the adhesive only variant). In general the prototype was focused on a potential in-space assembly approach, or kit-of-parts construction concept, which would not necessarily require the inclusion of an adhesive in the joint regions. However, given the tie in to legacy Station hardware (and potential flight loads with imbedded hardware mass loadings), the rack was built as stiff and strong as possible. Preliminary torque down tests were also conducted to determine the feasibility of mounting the composite honeycomb panels to the composite tubing sections via the additively manufactured tube inserts. Additional fastener torque down tests were also conducted with inserts (helicoils) imbedded within the joints. Lessons learned are also included and discussed.

  15. Power test for first prototype LIBO module

    CERN Multimedia

    Laurent Guiraud

    2000-01-01

    The Linac Booster (LIBO) is a prototype machine for producing particle beams for cancer therapy. Hadron therapy techniques are able to reach deep tumours with less damage to surrounding tissue than with conventional radiotherapy.

  16. Double-crystal analyser system for the PRISMA spectrometer: test of a prototype

    International Nuclear Information System (INIS)

    Petrillo, C.; Sacchetti, F.; Steigenberger, U.

    1993-11-01

    A prototype of a double-analyser system has been tested at the ISIS pulsed neutron source in order to determine the performance of such an analysing device in the low energy transfer region. The performance of such a system has been found satisfactory in terms of reflectivity and energy resolution as well as alignment procedures. Based on our test results we propose the construction of a second arm for the PRISMA (PRogetto deol'Istituto di Struttura della MAteria del Consiglio Nazionale delle Ricerche) spectrometer at ISIS. This new arm would enable us to perform measurements with much improved energy resolution and to extend the wavevector transfer range to much smaller values thus improving the instrument performance significantly for magnetic scattering experiments. The new, modular approach of the upgrade will also strengthen the flexibility of the instrument and open up the opportunity for further instrumental developments, for example the introduction of a polarization option. (Author)

  17. A beam test of a prototype of the BESIII drift chamber in magnetic field

    International Nuclear Information System (INIS)

    Liu, J.B.; Qin, Z.H.; Wu, L.H.; Chen, C.; Zhuang, B.A.; Chen, Y.B.; Jin, Y.; Liu, R.G.; Ma, X.Y.; Ma, Y.Y.; Tang, X.; Wang, L.; Xu, M.H.; Zhang, G.F.; Zhu, M.X.; Zhu, Q.M.

    2006-01-01

    A prototype of the BESIII drift chamber was tested with He/C 3 H 8 (60/40) gas mixture in a 1T magnetic field at the π-2 beam line of KEK 12GeV PS. The drift distance-time relationship was extracted for various conditions. The performance of the chamber, such as the spatial resolution, the dE/dx resolution and the cell efficiency, was studied in detail. The dE/dx was measured as a function of βγ to calculate the particle separation power. Based on the test results, the operating voltage of the BESIII drift chamber is optimized to be 2200V, resulting in a spatial resolution better than 110μm, a cell efficiency over 98%, a dE/dx resolution better than 5% and the 3σπ/K separation at a momentum exceeding 700MeV/c. These results confirm the validation of the physics design of the BESIII drift chamber

  18. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 1 of Volume IV, discusses: Process overview functional descriptions; Control system descriptions; Support system descriptions; Maintenance system descriptions; and Process equipment descriptions

  19. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 4 of Volume IV, discusses: Off-normal operating and recovery procedures; Emergency response procedures; Troubleshooting procedures; and Preventive maintenance procedures

  20. First Results of an “Artificial Retina” Processor Prototype

    International Nuclear Information System (INIS)

    Cenci, Riccardo; Bedeschi, Franco; Marino, Pietro; Morello, Michael J.; Ninci, Daniele; Piucci, Alessio; Punzi, Giovanni; Ristori, Luciano; Spinella, Franco; Stracka, Simone; Tonelli, Diego; Walsh, John

    2016-01-01

    We report on the performance of a specialized processor capable of reconstructing charged particle tracks in a realistic LHC silicon tracker detector, at the same speed of the readout and with sub-microsecond latency. The processor is based on an innovative pattern-recognition algorithm, called “artificial retina algorithm”, inspired from the vision system of mammals. A prototype of the processor has been designed, simulated, and implemented on Tel62 boards equipped with high-bandwidth Altera Stratix III FPGA devices. The prototype is the first step towards a real-time track reconstruction device aimed at processing complex events of high-luminosity LHC experiments at 40 MHz crossing rate

  1. Fabrication and performance tests of a prototype in-situ coating machine for JT-60

    International Nuclear Information System (INIS)

    Obara, Kenjiro; Abe, Tetsuya; Murakami, Yoshio

    1987-09-01

    Prior to the design and construction of the JT-60's in-situ coating device, a prototype machine was fabricated and tested to confirm the applicability of proposed driving methods and mechanical elements to the device which would be operated in very severe conditions including high ambient temperature and high vacuum. The machine basically consists of an in-vessel manipulator, a fiberscope and an ohmically heated titanium evaporator. From the test results, we recommended to use the combination of Inconel 625 and a self-lubricating alloy for the solid-lubricated bearings and MoS 2 -coated Inconel 625 for the solid-lubricated gears. It was also found that TiC coating showed a effect for the prevention of welding between bolts and nuts. In order to optimize the operating parameters of the machine, many wall inspection tests and titanium evaporation tests were carried out in a large vacuum vessel by simulating the JT-60 conditions. (author)

  2. To Test a Prototype of a Proton Lifetime Detector in a Neutrino Beam at the PS

    CERN Multimedia

    2002-01-01

    In order to test the performances of the calorimeter method in a nucleon lifetime experiment, a 3 ton prototype calorimeter made of iron and polystyrene scintillator sandwiches and of fine-grain counters has been designed by our collaboration. The energy and angular resolution will be tested by exposing this prototype to charged particles ($e, \\mu , \\pi$) in the 0.5 GeV/c range at Orsay and at CERN in Summer 1980. Since an unavoidable background to any experiment on nucleon decay consists of atmospheric neutrino events, which could in some cases simulate a nucleon decay, the knowledge of the configuration of such events in our detector is essential. It has been shown that the energy distribution of the $\

  3. Recent results of a seismically isolated optical table prototype designed for advanced LIGO

    International Nuclear Information System (INIS)

    Sannibale, V; Abbott, B; Boschi, V; Coyne, D; DeSalvo, R; Aso, Y; Marka, S; Ottaway, D; Stochino, A

    2008-01-01

    The Horizontal Access Module Seismic Attenuation System (HAM-SAS) is a mechanical device expressly designed to isolate a multipurpose optical table and fit in the tight space of the LIGO HAM Ultra-High-Vacuum chamber. Seismic attenuation in the detectors' sensitivity frequency band is achieved with state of the art passive mechanical attenuators. These devices should provide an attenuation factor of about 70dB above 10Hz at the suspension point of the Advanced LIGO triple pendulum suspension. Automatic control techniques are used to position the optical table and damp rigid body modes. Here, we report the main results obtained from the full scale prototype installed at the MIT LIGO Advanced System Test Interferometer (LASTI) facility. Seismic attenuation performance, control strategies, improvements and limitations are also discussed

  4. Design and prototype results of a far-infrared interferometer for MFTF-B

    International Nuclear Information System (INIS)

    Monjes, J.A.; Throop, A.L.; Thomas, S.R.; Peebles, A.; Zu, Qin-Zin.

    1983-01-01

    A Far-Infrared (FIR) Laser Interferometer (FLI), operating at 185 μm wavelength is planned as part of the initial start-up set of plasma diagnostics for the Mirror Fusion Test Facility (MFTF-B). The FLI will consist of a heterodyne, three-chord laser interferometer which will be used initially to measure line-integrated plasma density in the high-density, center cell region of the machine. The conceptual system design and analysis has been completed. There are several unique environmental/physical constraints and performance requirements for this system which have required that technology-evaluation and prototyping experiments be completed to support the design effort and confirm the expected performance parameters. Issues which have been addressed include extensive use of long-path dielectric waveguide, coupling and control of free-space propagation of the beam, and polarization control. The results and conclusions of the design analysis and experimental measurements will be presented

  5. Development and Test of a Prototype 100MVA Superconducting Generator

    Energy Technology Data Exchange (ETDEWEB)

    Fogarty, James M.; Bray, James W.

    2007-05-25

    In 2002, General Electric and the US Department of Energy (DOE) entered into a cooperative agreement for the development of a commercialized 100 MVA generator using high temperature superconductors (HTS) in the field winding. The intent of the program was to: • Identify and develop technologies that would be needed for such a generator. • Develop conceptual designs for generators with ratings of 100 MVA and higher using HTS technology. • Perform proof of concept tests at the 1.5 MW level for GE’s proprietary warm iron rotor HTS generator concept. • Design, build, and test a prototype of a commercially viable 100 MVA generator that could be placed on the power grid. This report summarizes work performed during the program and is provided as one of the final program deliverables.

  6. Macroscopic High-Temperature Structural Analysis Model of Small-Scale PCHE Prototype (II)

    International Nuclear Information System (INIS)

    Song, Kee Nam; Lee, Heong Yeon; Hong, Sung Deok; Park, Hong Yoon

    2011-01-01

    The IHX (intermediate heat exchanger) of a VHTR (very high-temperature reactor) is a core component that transfers the high heat generated by the VHTR at 950 .deg. C to a hydrogen production plant. Korea Atomic Energy Research Institute manufactured a small-scale prototype of a PCHE (printed circuit heat exchanger) that was being considered as a candidate for the IHX. In this study, as a part of high-temperature structural integrity evaluation of the small-scale PCHE prototype, we carried out high-temperature structural analysis modeling and macroscopic thermal and elastic structural analysis for the small-scale PCHE prototype under small-scale gas-loop test conditions. The modeling and analysis were performed as a precedent study prior to the performance test in the small-scale gas loop. The results obtained in this study will be compared with the test results for the small-scale PCHE. Moreover, these results will be used in the design of a medium-scale PCHE prototype

  7. Prototyping and testing of the Continuous External Rogowski ITER magnetic sensor

    Energy Technology Data Exchange (ETDEWEB)

    Moreau, Ph., E-mail: philippe.jacques.moreau@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Le-Luyer, A.; Malard, P.; Pastor, P.; Saint-Laurent, F.; Spuig, P. [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Lister, J.; Toussaint, M.; Marmillod, P.; Testa, D. [Centre de Recherches en Physique des Plasmas, EPFL (Switzerland); Peruzzo, S. [Consorzio RFX, Association EURATOM-ENEA, C.so Stati Uniti 4, 35127 Padova (Italy); Knaster, J. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); IFMIF EVEDA, Rokkasho (Japan); Vayakis, G.; Hughes, S.; Patel, K.M. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► ITER Continuous External Rogowski (CER) are designed for plasma and vacuum vessel current measurement. ► CER are located in the casing of Toroidal Field Coils and thus will operate at 4 K. ► The design of the sensors has been completed. ► CER prototypes have been manufactured by 2 suppliers. ► The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER. -- Abstract: The measurement of the plasma current in ITER plays an outstanding role as it is part of the machine protection and is a safety-relevant measurement: it will be used in relation with regulatory limits to show that the operation remains within the safe envelope defined in the ITER license. The Continuous External Rogowski (CER) is an inductive sensor designed for current measurements and located in the casing of 3 Toroidal Field Coils (TFCs). After the completion of the design of the CER, 4 prototypes of the sensor were manufactured and R and D activities were performed under a Grant with the European Domestic Agency (F4E-GRT-012). The work was carried out between 2010 and 2011 by the ITERMAG consortium comprising 3 laboratories: CRPP (Switzerland) as leader, CEA (France) and RFX (Italy). The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER in terms of electrical, thermal, mechanical and also of vacuum compatibility. From these results, electromagnetic modeling of the CER response was performed. It is demonstrated that the CER fulfills ITER requirements. However, the vacuum compatibility of the prototype has to be improved and solutions to cope with this issue are proposed.

  8. Prototyping and testing of the Continuous External Rogowski ITER magnetic sensor

    International Nuclear Information System (INIS)

    Moreau, Ph.; Le-Luyer, A.; Malard, P.; Pastor, P.; Saint-Laurent, F.; Spuig, P.; Lister, J.; Toussaint, M.; Marmillod, P.; Testa, D.; Peruzzo, S.; Knaster, J.; Vayakis, G.; Hughes, S.; Patel, K.M.

    2013-01-01

    Highlights: ► ITER Continuous External Rogowski (CER) are designed for plasma and vacuum vessel current measurement. ► CER are located in the casing of Toroidal Field Coils and thus will operate at 4 K. ► The design of the sensors has been completed. ► CER prototypes have been manufactured by 2 suppliers. ► The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER. -- Abstract: The measurement of the plasma current in ITER plays an outstanding role as it is part of the machine protection and is a safety-relevant measurement: it will be used in relation with regulatory limits to show that the operation remains within the safe envelope defined in the ITER license. The Continuous External Rogowski (CER) is an inductive sensor designed for current measurements and located in the casing of 3 Toroidal Field Coils (TFCs). After the completion of the design of the CER, 4 prototypes of the sensor were manufactured and R and D activities were performed under a Grant with the European Domestic Agency (F4E-GRT-012). The work was carried out between 2010 and 2011 by the ITERMAG consortium comprising 3 laboratories: CRPP (Switzerland) as leader, CEA (France) and RFX (Italy). The R and D campaign on CER prototypes consisted in the measurement of about 100 parameters to characterize the CER in terms of electrical, thermal, mechanical and also of vacuum compatibility. From these results, electromagnetic modeling of the CER response was performed. It is demonstrated that the CER fulfills ITER requirements. However, the vacuum compatibility of the prototype has to be improved and solutions to cope with this issue are proposed

  9. MPACT Fast Neutron Multiplicity System Prototype Development

    Energy Technology Data Exchange (ETDEWEB)

    D.L. Chichester; S.A. Pozzi; J.L. Dolan; M.T. Kinlaw; S.J. Thompson; A.C. Kaplan; M. Flaska; A. Enqvist; J.T. Johnson; S.M. Watson

    2013-09-01

    This document serves as both an FY2103 End-of-Year and End-of-Project report on efforts that resulted in the design of a prototype fast neutron multiplicity counter leveraged upon the findings of previous project efforts. The prototype design includes 32 liquid scintillator detectors with cubic volumes 7.62 cm in dimension configured into 4 stacked rings of 8 detectors. Detector signal collection for the system is handled with a pair of Struck Innovative Systeme 16-channel digitizers controlled by in-house developed software with built-in multiplicity analysis algorithms. Initial testing and familiarization of the currently obtained prototype components is underway, however full prototype construction is required for further optimization. Monte Carlo models of the prototype system were performed to estimate die-away and efficiency values. Analysis of these models resulted in the development of a software package capable of determining the effects of nearest-neighbor rejection methods for elimination of detector cross talk. A parameter study was performed using previously developed analytical methods for the estimation of assay mass variance for use as a figure-of-merit for system performance. A software package was developed to automate these calculations and ensure accuracy. The results of the parameter study show that the prototype fast neutron multiplicity counter design is very nearly optimized under the restraints of the parameter space.

  10. Performance test and analysis to the prototype of fiber-based portable large area surface contamination monitor

    International Nuclear Information System (INIS)

    Qu Yantao; Liu Yang; Wang Wei; Wang Ying; Hou Jie

    2013-01-01

    The feasibility was studied of using large area plastic scintillation (sensitive area up to 1200 cm 2 ) and wavelength-shifting fiber (WLS) to measure β surface contamination that led to a tentative adoption of direct coupling method of wavelength-shifting fiber array and plastic scintillator. Based on above, a calculation program was established, by which the optical transmission was simulated enabling optimizations to the design of the system such as the size of the plastic scintillator, the quantity of the wavelength-shifting fiber and the configuration mode of the wavelength-shifting fiber. As a result, a special experimental prototype was developed and tested. Results prove that the sensitive detection area is up to 1200 cm 2 , the detection efficiency is about 15.4%, the inconsistency of the different sensitive area is about 9.7%, and the minimum detectable limit is about 0.05 Bq/cm 2 , all of which indicate that the experimental prototype could satisfy requirements of surface pollution monitoring for both normal and accident conditions. (authors)

  11. First Results on the Prototype of the Laser-Megajoule Cryotarget Positioner

    International Nuclear Information System (INIS)

    Paquignon, G.; Brisset, D.; Cathala, B.; Lamaison, V.; Chatain, D.; Bonnay, P.; Bouleau, E.; Perin, J.P.

    2004-01-01

    The Laser Megajoule cryotarget positioner will be used to set the cryogenic targets at the center of the experimental vacuum chamber. It will consist of a 6-meter carbon boom at the end of which a target will be held by a cryogenic grip at 20 K. In the French concept, the targets will be transferred at 20 K to the cryotarget positioner using another cryostat. Some of the specifications are very ambitious. Indeed, the targets must be positioned with a high accuracy (+/-5 μm), the temperature must be controlled with a very good stability and the cryostat must have a 5 day autonomy. To reach these requirements, some technical solutions have been considered. To validate these choices, a scale one prototype has been studied and built at the Low Temperature Laboratory (SBT) of CEA/Grenoble (France). We present here the first results obtained with this prototype

  12. A digitalising board for the prototype array of LHAASO WCDA

    International Nuclear Information System (INIS)

    Hao Xinjun; Liu Shubin; Zhao Lei; An Qi

    2011-01-01

    In this paper, a digitalising board for readout of PMT signals in the prototype array of WCDA (water Cerenkov detector array) for LHAASO (Large high altitude air shower observatory)is designed. The prototype array is composed of 9 PMTs, including the pulse time and charge measurement from the PMTs, and clock generation and trigger decision. In the digitalising board, FPGA reconfiguration and data readout via VME bus are implemented. Test results show that the performances meet well with the requirements of readout electronics. It has been installed in Yangbajing and tests with the prototype array and DAQ is ongoing. (authors)

  13. Prototype 350 MHz niobium spoke-loaded cavities

    International Nuclear Information System (INIS)

    Delayen, J. R.; Kedzie, M.; Mammosser, J.; Piller, C.; Shepard, K. W.

    1999-01-01

    This paper reports the development of 350 MHz superconducting cavities of a spoke-loaded geometry, intended for the velocity range 0.2 < v/c < 0.6. Two prototype single-cell cavities have been designed, one optimized for velocity v/c = 0.4, and the other for v/c = 0.29. Construction of the prototype niobium cavities is nearly complete. Details of the design and construction are discussed, along with the results of cold tests

  14. Prototype 350 MHz niobium spoke-loaded cavities.

    Energy Technology Data Exchange (ETDEWEB)

    Delayen, J. R.; Kedzie, M.; Mammosser, J.; Piller, C.; Shepard, K. W.

    1999-05-10

    This paper reports the development of 350 MHz superconducting cavities of a spoke-loaded geometry, intended for the velocity range 0.2 < v/c < 0.6. Two prototype single-cell cavities have been designed, one optimized for velocity v/c = 0.4, and the other for v/c = 0.29. Construction of the prototype niobium cavities is nearly complete. Details of the design and construction are discussed, along with the results of cold tests.

  15. Project management of the build of the shore test facility for the prototype of PWR II

    International Nuclear Information System (INIS)

    Clarkson, D.T.

    1987-01-01

    The PWR II is a new design of nuclear steam raising plant for the Royal Navy's submarines. It features improved engineering for safety, increased power, increased shock resistance, reduced noise transmission to sea and reduced manning requirement. It is to be tested in a new prototype testing facility, the Shore Test Facility, which is a section of submarine hull containing a prototype of the nuclear steam raising plant and its support system. It is installed at the Vulcan Naval Reactor Test establishment at Dounreay in Scotland. The function of the establishment is to test new designs of core and reactor plant, validate the mathematical models used in their design, develop improved methods of operation and maintenance of the plant and test new items of equipment. The Shore Test Facility was built in large sections at Barrow-in-Furness and transported to Scotland. The project management for the construction of the Shore Test Facility is explained. It involves personnel from the Royal Navy, and a large number of people working for the contractors involved in the buildings, transportation, operation and maintenance of the Facility. (U.K.)

  16. Studies of a full-scale mechanical prototype line for the ANTARES neutrino telescope and tests of a prototype instrument for deep-sea acoustic measurements

    NARCIS (Netherlands)

    Ageron, M.; Kooijman, P.

    2007-01-01

    A full-scale mechanical prototype line was deployed to a depth of 2500 m to test the leak tightness of the electronics containers and the pressure-resistant properties of an electromechanical cable under evaluation for use in the ANTARES deep-sea neutrino telescope. During a month-long immersion

  17. Fabrication and testing history prototypes and production units

    Energy Technology Data Exchange (ETDEWEB)

    1954-09-01

    From April, 1951 to Aug, 1954, New York Shipbuilding Corp. carried out a subcontract with E.I. du Pont de Nemours & Company that was without parallel in the shipyard`s history. The work, designated the NYX Project for reasons of security, was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: developmental and experimental work; fabrication and testing of a prototype unit; fabrication of production units. Five production units were ultimately built, one of them converted from the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. Du Pont`s technical experience and the background of New York Ship in heavy construction, particularly in the fabrication of naval gun turrets, were combined from the outset to resolve the difficult fabrication problems that occurred almost daily. Representatives of both companies worked together as a team in the shops and at supervisory levels to an unprecedented extent. The report is intended primarily to summarize New York Ship`s part in the project, but also includes some of du Pont`s activities since the work of the two organizations was so interrelated. Because of the scope of the program, it will not always be possible to provide detailed information, but rather to record what happened in general terms. Where the reader desires more specific data, he should refer to original plans and records, including various reports compiled during the course of the project.

  18. Diagnostic accuracy of a prototype point-of-care test for ocular Chlamydia trachomatis under field conditions in The Gambia and Senegal.

    Directory of Open Access Journals (Sweden)

    Emma M Harding-Esch

    2011-08-01

    Full Text Available The clinical signs of active trachoma are often present in the absence of ocular Chlamydia trachomatis infection in low prevalence and mass treated settings. Treatment decisions are currently based on the prevalence of clinical signs, and this may result in the unnecessary distribution of mass antibiotic treatment. We aimed to evaluate the diagnostic accuracy of a prototype point-of-care (POC test, developed for field diagnosis of ocular C. trachomatis, in low prevalence settings of The Gambia and Senegal.Three studies were conducted, two in The Gambia and one in Senegal. Children under the age of 10 years were screened for the clinical signs of trachoma. Two ocular swabs were taken from the right eye. The first swab was tested by the POC test in the field and the result independently graded by two readers. The second swab was tested for the presence of C. trachomatis by Amplicor Polymerase Chain Reaction. In Senegal, measurements of humidity and temperature in the field were taken. A total of 3734 children were screened, 950 in the first and 1171 in the second Gambian study, and 1613 in Senegal. The sensitivity of the prototype POC test ranged between 33.3-67.9%, the specificity between 92.4-99.0%, the positive predictive value between 4.3-21.0%, and the negative predictive value between 98.0-99.8%. The rate of false-positives increased markedly at temperatures above 31.4°C and relative humidities below 11.4%.In its present format, this prototype POC test is not suitable for field diagnosis of ocular C. trachomatis as its specificity decreases in hot and dry conditions: the environment in which trachoma is predominantly found. In the absence of a suitable test for infection, trachoma diagnosis remains dependent on clinical signs. Under current WHO recommendations, this is likely resulting in the continued mass treatment of non-infected communities.

  19. Close encounters of the prototype kind

    CERN Multimedia

    2005-01-01

    CERN is building a new control centre for the operation of its entire accelerator complex and technical infrastructure. The prototype console for the new centre has just been installed and tested. Close encounters of the prototype kind CERN is building a new control centre for the operation of its entire accelerator complex and technical infrastructure. The prototype console for the new centre has just been installed and tested. The prototype of the control consoles that will be at the heart of the future CERN Control Centre (CCC) has just been installed in the Roy Billinge Room in Building 354. Until now, there have been four separate control rooms for the CERN accelerators and technical infrastructure. The CCC, which will be located on the Prévessin site, will bring them all together in a single room. The Centre will consist of 40 consoles for four different areas (LHC, SPS, PS complex and technical infrastructure). The prototype was tested by the technicians for a month. Following installation and con...

  20. Mobile prototyping with Axure 7

    CERN Document Server

    Hacker, Will

    2013-01-01

    This book is a step-by-step tutorial which includes hands-on examples and downloadable Axure files to get you started with mobile prototyping immediately. You will learn how to develop an application from scratch, and will be guided through each and every step.If you are a mobile-centric developer/designer, or someone who would like to take their Axure prototyping skills to the next level and start designing and testing mobile prototypes, this book is ideal for you. You should be familiar with prototyping and Axure specifically, before you read this book.

  1. Hadron calorimeter module prototype for baryonic matter studies at Nuclotron

    OpenAIRE

    Gavrishchuk, O. P.; Ladygin, V. P.; Petukhov, Yu. P.; Sychkov, S. Ya

    2014-01-01

    The prototype of the hadron calorimeter module consisting of 66 scintillator/lead layers with the 15x15 cm^2 cross section and 5 nuclear interaction lengths has been designed and produced for the zero degree calorimeter of the BM@N experiment. The prototype has been tested with high energy muon beam of the U-70 accelerator at IHEP. The results of the beam test for different types of photo multipliers and light guides are presented. The results of the Monte-Carlo simulation of the calorimeter ...

  2. Results of the First Performance Tests of the CMS Electromagnetic Calorimeter

    CERN Document Server

    Adzic, Petar; Almeida, Carlos; Almeida, Nuno; Anagnostou, Georgios; Anfreville, Marc; Anicin, Ivan; Antunovic, Zeljko; Asimidis, Asimakis; Auffray, Etiennette; Baccaro, Stefania; Barney, David; Barone, Luciano; Barrillon, Pierre; Bartoloni, Alessandro; Beauceron, Stephanie; Beaudette, Florian; Bell, Ken W; Benetta, Robert; Bercher, Michel; Beteva, B; Beuselinck, Raymond; Bhardwa, A; Biino, Cristina; Bimbot, Stephane; Bloch, Philippe; Blyth, Simon; Bonesini, Maurizio; Bordalo, Paula; Bornheim, Adolf; Bourotte, Jean; Britton, David; Brown, Robert M; Brunelière, Renaud; Busson, Philippe; Camporesi, Tiziano; Cartiglia, Nicolo; Cavallari, Francesca; Chamont, David; Chang, Paoti; Chang, You-Hao; Charlot, Claude; Chen, E Augustine; Chipaux, Rémi; Cockerill, David J A; Collard, Caroline; Combaret, Christophe; Costantini, Silvia; Da Silva, J C; Dafinei, Ioan; Daskalakis, Georgios; Davatz, Giovanna; De Min, Alberto; Deiters, Konrad; Dejardin, Marc; Della Negra, Rodolphe; Depasse, Pierre; Descamp, J; Dewhirst, Guy; Dhawan, Satish; Diemoz, Marcella; Dissertori, Günther; Dittmar, Michael; Djambazov, Lubomir; Dobrzynski, Ludwik; Drndarevic, Snezana; Dupanloup, Michel; Dzelalija, Mile; Ehlers, Jan; El-Mamouni, H; Peisert, Anna; Evangelou, Ioannis; Fabbro, Bernard; Faure, Jean-Louis; Fay, Jean; Ferri, Federico; Flower, Paul S; Franzoni, Giovanni; Funk, Wolfgang; Gaillac, Anne-Marie; Gargiulo, Corrado; Gascon-Shotkin, S; Geerebaert, Yannick; Gentit, François-Xavier; Ghezzi, Alessio; Gilly, Jean; Giolo-Nicollerat, Anne-Sylvie; Givernaud, Alain; Gninenko, Sergei; Go, Apollo; Godinovic, Nikola; Golubev, Nikolai; Gómez-Reino, Robert; Govoni, Pietro; Grahl, James; Gras, Philippe; Greenhalgh, Justin; Guillaud, Jean-Paul; Haguenauer, Maurice; Hamel De Montechenault, G; Hansen, Magnus; Heath, Helen F; Hill, Jack; Hobson, Peter R; Holmes, Daniel; Holzner, André; Hou, George Wei-Shu; Ille, Bernard; Ingram, Quentin; Jain, Adarsh; Janot, Patrick; Jarry, Patrick; Karar, M A; Kataria, Sushil Kumar; Katchanov, V A; Kennedy, Bruce W; Kloukinas, Kostas; Koblitz, Birger; Kokkas, Panagiotis; Korjik, M; Krasnikov, Nikolai; Krpic, Dragomir; Kyriakis, Aristotelis; Lebeau, Michel; Lecomte, Pierre; Lecoq, Paul; Lemaire, Marie-Claude; Lethuillier, Morgan; Lin, Willis; Lintern, A L; Lister, Alison; Locci, Elizabeth; Lodge, Anthony B; Longo, Egidio; Loukas, Demetrios; Lustermann, Werner; Lynch, Clare; MacKay, Catherine Kirsty; Maletic, Dimitrije; Mandjavidze, Irakli; Manthos, Nikolaos; Markou, Athanasios; Mathez, Hervé; Matveev, Viktor; Maurelli, Georges; Menichetti, Ezio; Meridiani, Paolo; Milenovic, Predrag; Milleret, Gérard; Miné, Philippe; Montecchi, Marco; Mur, Michel; Musienko, Yuri; Nardulli, Alessandro; Nash, Jordan; Neal, Homer; Nédélec, Patrick; Negri, Pietro; Nessi-Tedaldi, Francesca; Newman, Harvey B; Nikitenko, Alexander; Obertino, Maria Margherita; Ofierzynski, Radoslaw Adrian; Organtini, Giovanni; Paganini, Pascal; Paganoni, Marco; Papadopoulos, Ioannis; Paramatti, Riccardo; Pastrone, Nadia; Pauss, Felicitas; Poilleux, Patrick; Puljak, Ivica; Pullia, Antonino; Puzovic, Jovan; Ragazzi, Stefano; Ramos, Sergio; Rander, John; Ravat, Olivier; Raymond, M; Razis, Panos A; Redaelli, Nicola; Regnault, Nicolas; Renker, Dieter; Reucroft, Steve; Reymond, Jean-Marc; Reynaud, Michel; Reynaud, Serge; Romanteau, Thierry; Rondeaux, Françoise; Rosowsky, André; Rovelli, Chiara; Rusack, Roger; Rusakov, Sergey V; Ryan, Matthew John; Rykaczewski, Hans; Sakhelashvili, Tariel; Salerno, Roberto; Santos, Marcelino; Schinzel, Dietrich; Seez, Christopher; Semeniouk, Igor; Sempere-Roldan, P; Sharif, Omar; Sharp, Peter; Shepherd-Themistocleous, Claire; Shevchenko, Sergey; Shivpuri, Ram Krishen; Sidiropoulos, Georgios; Sillou, Daniel; Singovsky, Alexander; Sirois, Yves; Sirunyan, Albert M; Smith, Brian; Smith, Vincent J; Sproston, Martin; Suter, Henry; Swain, John; Tabarelli de Fatis, Tommaso; Takahashi, Maiko; Tapper, Robert J; Tcheremoukhine, Alexandre; Teixeira, Isabel; Teixeira, Joao Paulo; Teller, Olivier; Triantis, Frixos A; Troshin, Sergey; Tyurin, Nikolay; Udriot, Stève; Ueno, Koji; Uzunian, Andrey; Van Vulpen, Ivo; Varela, Joao; Vaz-Cardoso, N; Verrecchia, Patrice; Vichoudis, Paschalis; Viertel, Gert; Virdee, Tejinder; Wang, Minzu; Williams, Jennifer C; Yaselli, Ignacio; Zamiatin, Nikolai; Zelepoukine, Serguei; Zeller, Michael E; Zhang, Lin; Zhu, Kejun; Zhu, Ren-Yuan

    2006-01-01

    Performance tests of some aspects of the CMS ECAL were carried out on modules of the "barrel" sub-system in 2002 and 2003. A brief test with high energy electron beams was made in late 2003 to validate prototypes of the new Very Front End electronics. The final versions of the monitoring and cooling systems, and of the high and low voltage regulation were used in these tests. The results are consistent with the performance targets including those for noise and overall energy resolution, required to fulfil the physics programme of CMS at the LHC.

  3. FEM analyses and prototype tests of the UPP structure for the ECRH in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, D. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Materials Research I, P.O. Box 3640, D-76021 Karlsruhe (Germany)], E-mail: dirk.strauss@imf.fzk.de; Gantenbein, G. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Pulsed Power and Microwave Technology, P.O. Box 3640, D-76021 Karlsruhe (Germany); Heidinger, R.; Kleefeldt, K. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Materials Research I, P.O. Box 3640, D-76021 Karlsruhe (Germany); Leonhardt, W. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Pulsed Power and Microwave Technology, P.O. Box 3640, D-76021 Karlsruhe (Germany); Meier, A. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Materials Research I, P.O. Box 3640, D-76021 Karlsruhe (Germany); Mellein, D. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Pulsed Power and Microwave Technology, P.O. Box 3640, D-76021 Karlsruhe (Germany); Scherer, T. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Materials Research I, P.O. Box 3640, D-76021 Karlsruhe (Germany); Serikov, A. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Reactor Safety, P.O. Box 3640, D-76021 Karlsruhe (Germany); Spaeh, P.; Vaccaro, A. [Forschungszentrum Karlsruhe, Association FZK-Euratom, Karlsruhe (Germany); Institute for Materials Research I, P.O. Box 3640, D-76021 Karlsruhe (Germany)

    2009-06-15

    The ITER electron cyclotron upper port launching system has to provide local current drive in order to stabilize neoclassical tearing modes (NTMs) and the sawtooth instability. The mm-wave system is embedded in a rigid upper port plug structure optimized for the rough operating conditions. During regular operation the structure is heated by neutrons and photons which are simulated by the Monte-Carlo method. The structural system has to provide sufficient cooling especially in the front part where high heat loads occur. If the active plasma stabilization fails the worst case scenario for the upper port plugs is the upward vertical displacement event (VDE) followed by a fast current quench. The fast plasma disruption occurs close to the plugs; eddy currents are induced and interact with the strong static magnetic field. The resulting mechanical forces and torque moments stress the structural system to its physical limits; a detailed numerical analysis, prototype crosschecks and design optimization is required to obtain a working system for ITER. Numerical structural, thermal and fluid dynamic analyses are presented as well as prototype tests and finally the effect of plasma disruptions on the structural design is discussed.

  4. Test of 1D carbon-carbon composite prototype tiles for the SPIDER diagnostic calorimeter

    Science.gov (United States)

    Serianni, G.; Pimazzoni, A.; Canton, A.; Palma, M. Dalla; Delogu, R.; Fasolo, D.; Franchin, L.; Pasqualotto, R.; Tollin, M.

    2017-08-01

    Additional heating will be provided to the thermonuclear fusion experiment ITER by injection of neutral beams from accelerated negative ions. In the SPIDER test facility, under construction at Consorzio RFX in Padova (Italy), the production of negative ions will be studied and optimised. To this purpose the STRIKE (Short-Time Retractable Instrumented Kalorimeter Experiment) diagnostic will be used to characterise the SPIDER beam during short operation (several seconds) and to verify if the beam meets the ITER requirement regarding the maximum allowed beam non-uniformity (below ±10%). The most important measurements performed by STRIKE are beam uniformity, beamlet divergence and stripping losses. The major components of STRIKE are 16 1D-CFC (Carbon matrix-Carbon Fibre reinforced Composite) tiles, observed at the rear side by a thermal camera. The requirements of the 1D CFC material include a large thermal conductivity along the tile thickness (at least 10 times larger than in the other directions); low specific heat and density; uniform parameters over the tile surface; capability to withstand localised heat loads resulting in steep temperature gradients. So 1D CFC is a very anisotropic and delicate material, not commercially available, and prototypes are being specifically realised. This contribution gives an overview of the tests performed on the CFC prototype tiles, aimed at verifying their thermal behaviour. The spatial uniformity of the parameters and the ratio between the thermal conductivities are assessed by means of a power laser at Consorzio RFX. Dedicated linear and non-linear simulations are carried out to interpret the experiments and to estimate the thermal conductivities; these simulations are described and a comparison of the experimental data with the simulation results is presented.

  5. Task plan for test of PRBT prototypic liquid sampler

    International Nuclear Information System (INIS)

    Jenkins, W.J.

    1992-01-01

    The primary objective of this task is to determine just how representative Precipitate Reactor Bottom Tank (PRBT) samples taken from the Hydragard trademark prototypic liquid sampler are of the in-tank contents and also to determine the homogeneity of the in-tank contents. This shall be accomplished by a statistical design study sampling plan for paired contrasts of the analysis results of samples taken from: (1) the Hydragard trademark prototypic liquid sampler paired with the more fundamental grab sampler at the lower elevation for the Hydragard trademark prototypic liquid sampler accuracy and (2) the grab sampler at the lower elevation paired with the grab sampler at the upper elevation for the in-tank homogeneity. These measurements are paired together to sharpen the contrast so that, as nearly as possible, only the conditions of the effect under study will differ between the two. This ''split-plot'' arrangement provides increased precision for the contrast under study by canceling out common extraneous effects, thereby enabling the detection of smaller effects. The secondary objective of the task is to determine the level of influence of the major contributors to the overall uncertainty in the sample preparation and measurement process. These major steps include: preparation method (H 2 SO 4 -HF Titanium dissolution); aliquoting and dilution within a dissolution; measurement and long-term behavior of the ICP and AA instruments, as monitored by the measurement of standards and blanks embedded within each block of samples for the measurement sequence. This sampling task, therefore, is mostly devoted to determining the sampler characteristics and is not intended to provide a comprehensive estimate of the overall uncertainty affecting DWPF sample analysis in routine operation

  6. Compact Multipurpose Mobile Laser Scanning System — Initial Tests and Results

    Directory of Open Access Journals (Sweden)

    Craig Glennie

    2013-01-01

    Full Text Available We describe a prototype compact mobile laser scanning system that may be operated from a backpack or unmanned aerial vehicle. The system is small, self-contained, relatively inexpensive, and easy to deploy. A description of system components is presented, along with the initial calibration of the multi-sensor platform. The first field tests of the system, both in backpack mode and mounted on a helium balloon for real-world applications are presented. For both field tests, the acquired kinematic LiDAR data are compared with highly accurate static terrestrial laser scanning point clouds. These initial results show that the vertical accuracy of the point cloud for the prototype system is approximately 4 cm (1σ in balloon mode, and 3 cm (1σ in backpack mode while horizontal accuracy was approximately 17 cm (1σ for the balloon tests. Results from selected study areas on the Sacramento River Delta and San Andreas Fault in California demonstrate system performance, deployment agility and flexibility, and potential for operational production of high density and highly accurate point cloud data. Cost and production rate trade-offs place this system in the niche between existing airborne and tripod mounted LiDAR systems.

  7. NIF/LMJ prototype amplifier mechanical design

    International Nuclear Information System (INIS)

    Horvath, J.

    1996-10-01

    Amplifier prototypes for the National Ignition Facility and the Laser Megajoule will be tested at Lawrence Livermore National Laboratory. The prototype amplifier, which is an ensemble of modules from LLNL and Centre d'Etudes de Limeil-Valenton, is cassette-based with bottom access for maintenance. A sealed maintenance transfer vehicle which moves optical cassettes between the amplifier and the assembly cleanroom, and a vacuum gripper which holds laser slabs during cassette assembly will also be tested. The prototype amplifier will be used to verify amplifier optical performance, thermal recovery time, and cleanliness of mechanical operations

  8. Analysis of results of testing of the prototype sample TUK-84 for drop

    International Nuclear Information System (INIS)

    Veselkov, I.L.; Samarin, Yu.A.; Tverdokhlebov, P.Yu.

    2006-01-01

    Calculations of the stress-strained state of the TUK-84 shipping casks (SC) and its throw rest results are analyzed. The calculational and experimental data agree well. The conclusion is made on conservation of the SC strength and serviceability after mechanical load action under conditions of emergency situations. Test results permitted to develop a calculational model for analysis of the stress-strained state of the structures of TUK-84 SC different modifications, fabricated from rolls [ru

  9. The Scintillator Tile Hadronic Calorimeter Prototype

    International Nuclear Information System (INIS)

    Rusinov, V.

    2006-01-01

    A high granularity scintillator hadronic calorimeter prototype is described. The calorimeter is based on a novel photodetector - Silicon Photo-Multiplier (SiPM). The main parameters of SiPM are discussed as well as readout cell construction and optimization. The experience with a small prototype production and testing is described. A new 8 k channel prototype is being manufactured now

  10. Prototype Systems for Measuring Outdoor Air Intake Rates in Rooftop Air Handlers

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, William J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Chan, Wanyu R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hotchi, Toshifumi [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-01-01

    The widespread absence of systems for real-time measurement and feedback control, of minimum outdoor air intake rates in HVAC systems contributes to the poor control of ventilation rates in commercial buildings. Ventilation rates affect building energy consumption and influence occupant health. The project designed fabricated and tested four prototypes of systems for measuring rates of outdoor air intake into roof top air handlers. All prototypes met the ±20% accuracy target at low wind speeds, with all prototypes accurate within approximately ±10% after application of calibration equations. One prototype met the accuracy target without a calibration. With two of four prototype measurement systems, there was no evidence that wind speed or direction affected accuracy; however, winds speeds were generally below usually 3.5 m s-1 (12.6 km h-1) and further testing is desirable. The airflow resistance of the prototypes was generally less than 35 Pa at maximum RTU air flow rates. A pressure drop of this magnitude will increase fan energy consumption by approximately 4%. The project did not have resources necessary to estimate costs of mass produced systems. The retail cost of components and materials used to construct prototypes ranged from approximately $1,200 to $1,700. The test data indicate that the basic designs developed in this project, particularly the designs of two of the prototypes, have considerable merit. Further design refinement, testing, and cost analysis would be necessary to fully assess commercial potential. The designs and test results will be communicated to the HVAC manufacturing community.

  11. Sodium heat pipe module test for the SAFE-30 reactor prototype

    International Nuclear Information System (INIS)

    Reid, Robert S.; Sena, J. Tom; Martinez, Adam L.

    2001-01-01

    Reliable, long-life, low-cost heat pipes can enable safe, affordable space fission power and propulsion systems. Advanced versions of these systems can in turn allow rapid access to any point in the solar system. Twelve stainless steel-sodium heat pipe modules were built and tested at Los Alamos for use in a non-nuclear thermohydraulic simulation of the SAFE-30 reactor (Poston et al., 2000). SAFE-30 is a near-term, low-cost space fission system demonstration. The heat pipes were designed to remove thermal power from the SAFE-30 core, and transfer this power to an electrical power conversion system. These heat pipe modules were delivered to NASA Marshall Space Flight Center in August 2000 and were assembled and tested in a prototypical configuration during September and October 2000. The construction and test of one of the SAFE-30 modules is described

  12. Development of a prototype of a candidate camera payload

    OpenAIRE

    Oltedal, Jon Kalevi

    2016-01-01

    The second prototype for the NUTS camera module have been tested to confirm if changes made from the first prototype were successful. The first prototype suffered from noise issues when operating at the maximum clock frequency of 96MHz. This needed to be fixed for the MT9P031 image sensor to be usable in further designs. Debugging and testing using the camera prototype hardware and software proved that the prototype managed to produce noise free images with bright parts in the images. These r...

  13. Field testing of prototype systems for the non-destructive measurement of the neutral temperature of railroad tracks

    Science.gov (United States)

    Phillips, Robert; Lanza di Scalea, Francesco; Nucera, Claudio; Fateh, Mahmood; Choros, John

    2014-03-01

    In both high speed and freight rail systems, the modern construction method is Continuous Welded Rail (CWR). The purpose of the CWR method is to eliminate joints in order to reduce the maintenance costs for both the rails and the rolling stock. However the elimination of the joints increases the risk of rail breakage in cold weather and buckling in hot weather. In order to predict the temperature at which the rail will break or buckle, it is critical to have knowledge of the temperature at which the rail is stress free, namely, the Rail Neutral Temperature (Rail-NT).The University of California at San Diego has developed an innovative technique based on non-linear ultrasonic guided waves, under FRA research and development grants for the non-destructive measurement of the neutral temperature of railroad tracks. Through the licensing of this technology from the UCSD and under the sponsorship of the FRA Office of Research and Development, a field deployable prototype system has been developed and recently field tested at cooperating railroad properties. Three prototype systems have been deployed to the Union Pacific (UP), Burlington Northern Santa Fe (BNSF), and AMTRAK railroads for field testing and related data acquisition for a comprehensive evaluation of the system, with respect to both performance and economy of operation. The results from these tests have been very encouraging. Based on the lessons learned from these field tests and the feedback from the railroads, it is planned develop a compact 2nd generation Rail-NT system to foster deployment and furtherance of FRA R&D grant purpose of potential contribution to the agency mission of US railroad safety. In this paper, the results of the field tests with the railroads in summer of 2013 are reported.

  14. Performance of the NIF prototype beamlet

    International Nuclear Information System (INIS)

    Van Wonterghem, B.M.; Murray, J.R.; Speck, D.R.; Campbell, J.H.

    1994-01-01

    Beamlet is a full scale single beam prototype laser system, built to demonstrate the laser technology and performance of the 192 beam National Ignition Facility (NIF) fusion laser driver. Both laser systems apply multipass amplifier architectures. By passing the beam four times through the large aperture amplifier sections, the small signal gain during the first few passes is used efficiently to reduce expensive staged amplifier chains. The beamlet prototype laser integrates results of development programs for large aperture components: large aperture optical switch, polarizers, 2 x 2 multisegment amplifiers and new pulse generation and pre-amplification techniques. The authors report on performance test results of the recently completed 1 ω-laser section of Beamlet

  15. arXiv Construction and beam-tests of silicon-tungsten prototype modules for the CMS High Granularity Calorimeter for HL-LHC

    CERN Document Server

    INSPIRE-00664095

    2018-02-26

    As part of its HL-LHC upgrade program, CMS is developing a High Granularity Calorimeter (HGCAL) to replace the existing endcap calorimeters. The HGCAL will be realised as a sampling calorimeter, including an electromagnetic compartment comprising 28 layers of silicon pad detectors with pad areas of 0.5–1.0 cm2 interspersed with absorbers. Prototype modules, based on 6-inch hexagonal silicon pad sensors with 128 channels, have been constructed and include many of the features required for this challenging detector. In 2016, beam tests of sampling configurations made from these modules have been conducted both at FNAL and at CERN using the Skiroc2 front-end ASIC (designed by the CALICE collaboration for ILC). In 2017, the setup has been extended with CALICE's AHCAL prototype, a scinitillator based sampling calorimeter, and it was further tested in dedicated beam tests at CERN. There, the new Skiroc2-CMS front-end ASIC was used for the first time. We highlight final results from our studies in 2016, including ...

  16. A product lifecycle management framework to support the exchange of prototyping and testing information

    Science.gov (United States)

    Toche Fumchum, Luc Boris

    2011-12-01

    The modern perspective on product life cycle and the rapid evolution of Information and Communication Technologies in general have opened a new era in product representation and product information sharing between participants, both inside and outside the enterprise and throughout the product life. In particular, the Product Development Process relies on cross-functional activities involving different domains of expertise that each have their own dedicated tools. This has generated new challenges in terms of collaboration and dissemination of information at large between companies or even within the same organization. Within this context, the work reported herein focuses on a specific stakeholder within product development activities - the prototyping and testing department. Its business is typically related to the planning and building of prototypes in order to perform specific tests on the future product or one of its sub-assemblies. The research project aims at investigating an appropriate framework that leverages configured engineering product information, based on complementary information structures, to share and exchange prototyping and testing information in a Product Lifecycle Management (PLM) perspective. As a first step, a case study based on the retrofit of an aircraft engine is deployed to implement a scenario demonstrating the functionalities to be available within the intended framework. For this purpose, complementary and configurable structures are simulated within the project's PLM system. In a second step are considered the software interoperability issues that don't only affect Design -- Testing interactions, but many other interfaces within either the company -- due to the silo-arrangement -- or the consortiums with partners, in which case the whole PLM platforms could simply be incompatible. A study based on an open source initiative and relying on an improved model of communication is described to show how two natively disparate PLM tools can

  17. Prototype to measure bracket debonding force in vivo

    Directory of Open Access Journals (Sweden)

    Jéssika Lagni Tonus

    Full Text Available ABSTRACT Introduction: Material biodegradation that occurs in the mouth may interfere in the bonding strength between the bracket and the enamel, causing lower bond strength values in vivo, in comparison with in vitro studies. Objective: To develop a prototype to measure bracket debonding force in vivo and to evaluate, in vitro, the bond strength obtained with the prototype. Methods: A original plier (3M Unitek was modified by adding one strain gauge directly connected to its claw. An electronic circuit performed the reading of the strain gauge, and the software installed in a computer recorded the values of the bracket debonding force, in kgf. Orthodontic brackets were bonded to the facial surface of 30 bovine incisors with adhesive materials. In Group 1 (n = 15, debonding was carried out with the prototype, while tensile bond strength testing was performed in Group 2 (n = 15. A universal testing machine was used for the second group. The adhesive remnant index (ARI was recorded. Results: According to Student’s t test (α = 0.05, Group 1 (2.96 MPa and Group 2 (3.08 MPa were not significantly different. ARI score of 3 was predominant in the two groups. Conclusion: The prototype proved to be reliable for obtaining in vivo bond strength values for orthodontic brackets.

  18. Prototype to measure bracket debonding force in vivo

    Science.gov (United States)

    Tonus, Jéssika Lagni; Manfroi, Fernanda Borguetti; Borges, Gilberto Antonio; Grigolo, Eduardo Correa; Helegda, Sérgio; Spohr, Ana Maria

    2017-01-01

    ABSTRACT Introduction: Material biodegradation that occurs in the mouth may interfere in the bonding strength between the bracket and the enamel, causing lower bond strength values in vivo, in comparison with in vitro studies. Objective: To develop a prototype to measure bracket debonding force in vivo and to evaluate, in vitro, the bond strength obtained with the prototype. Methods: A original plier (3M Unitek) was modified by adding one strain gauge directly connected to its claw. An electronic circuit performed the reading of the strain gauge, and the software installed in a computer recorded the values of the bracket debonding force, in kgf. Orthodontic brackets were bonded to the facial surface of 30 bovine incisors with adhesive materials. In Group 1 (n = 15), debonding was carried out with the prototype, while tensile bond strength testing was performed in Group 2 (n = 15). A universal testing machine was used for the second group. The adhesive remnant index (ARI) was recorded. Results: According to Student’s t test (α = 0.05), Group 1 (2.96 MPa) and Group 2 (3.08 MPa) were not significantly different. ARI score of 3 was predominant in the two groups. Conclusion: The prototype proved to be reliable for obtaining in vivo bond strength values for orthodontic brackets. PMID:28444011

  19. High-power circulator test results at 350 and 700 MHz

    International Nuclear Information System (INIS)

    Roybal, W.; Bradley, J.T.; Rees, D.E.

    2000-01-01

    The high-power RF systems for the Accelerator Production of Tritium (APT) program require high-power circulators at 350 MHz and 700 MHz to protect 1 MW Continuous Wave (CW) klystrons from reflected power. The 350 MHz circulator is based on the CERN, EXF, and APS designs and has performed very well. The 700 MHz circulator is a new design. Prototype 700 MHz circulators have been high-power tested at Los Alamos National Laboratory (LANL). The first of these circulators has satisfied performance requirements. The circulator requirements, results from the testing, and lessons learned from this development are presented and discussed

  20. Initial results from a prototype whole-body photon-counting computed tomography system.

    Science.gov (United States)

    Yu, Z; Leng, S; Jorgensen, S M; Li, Z; Gutjahr, R; Chen, B; Duan, X; Halaweish, A F; Yu, L; Ritman, E L; McCollough, C H

    X-ray computed tomography (CT) with energy-discriminating capabilities presents exciting opportunities for increased dose efficiency and improved material decomposition analyses. However, due to constraints imposed by the inability of photon-counting detectors (PCD) to respond accurately at high photon flux, to date there has been no clinical application of PCD-CT. Recently, our lab installed a research prototype system consisting of two x-ray sources and two corresponding detectors, one using an energy-integrating detector (EID) and the other using a PCD. In this work, we report the first third-party evaluation of this prototype CT system using both phantoms and a cadaver head. The phantom studies demonstrated several promising characteristics of the PCD sub-system, including improved longitudinal spatial resolution and reduced beam hardening artifacts, relative to the EID sub-system. More importantly, we found that the PCD sub-system offers excellent pulse pileup control in cases of x-ray flux up to 550 mA at 140 kV, which corresponds to approximately 2.5×10 11 photons per cm 2 per second. In an anthropomorphic phantom and a cadaver head, the PCD sub-system provided image quality comparable to the EID sub-system for the same dose level. Our results demonstrate the potential of the prototype system to produce clinically-acceptable images in vivo .

  1. The CALICE hadron calorimeters - beam test results and new developments

    International Nuclear Information System (INIS)

    Cvach, J.

    2009-01-01

    using muons, positrons, pions, and protons and in the laboratory using cosmic rays. The results validate the concept and have served as the basis for the design to fully instrument the 1m 3 CALICE test beam absorber structure. An update on the ongoing construction of the active modules will be given. An alternative approach is to use semi-digital readout electronics following a design close to the one to be used in the future linear collider experiments. One feature of this electronics integration concept is that it would not require active cooling but rely on power-pulsed electronics. Based on this concept, a small prototype was built and tested with success at the CERN PS test beam in 2008. To validate completely this new concept a scalable prototype structure of 1m 3 volume is being planned. A few GRPCs as large as 1 m 2 were built with a new design with emphasis on minimized dead zones and optimized gas flow. The GRPCs were tested with an electronics board of the same size, containing 144 64-channel ASICs, representing the largest ever built with the embedded electronics scheme. (author)

  2. Current Sharing Analysis of Arm Prototype for ITER PF Converter Bridge

    International Nuclear Information System (INIS)

    Li Jinchao; Song Zhiquan; Xu Liuwei; Fu Peng; Guo Bin; Li Sen; Dong Lin; Wang Min

    2014-01-01

    A bridge arm prototype of ITER poloidal field (PF) converter modules has been designed and fabricated. Non-cophase counter parallel connection is chosen as the arm structure of the prototype. Among all factors affecting current sharing, arm structure is the main one. During the design of the arm prototype, a novel method based on inductance matrixes is employed to improve the current sharing of the bridge arm. The test results on the prototype show that the current sharing performance of the arm prototype is much better than relevant design requirement, and that the matrix method is very effective to analyze and solve the current sharing problems of thyristor converters

  3. FY97 ICCS prototype specification

    International Nuclear Information System (INIS)

    Woodruff, J.

    1997-01-01

    The ICCS software team will implement and test two iterations of their software product during FY97. This document specifies the products to be delivered in that first prototype and projects the direction that the second prototype will take. Detailed specification of the later iteration will be written when the results of the first iteration are complete. The selection of frameworks to be implemented early is made on a basis of risk analysis from the point of view of future development in the ICCS project. The prototype will address risks in integration of object- oriented components, in refining our development process, and in emulation testing for FEP devices. This document is a specification that identifies products and processes to undertake for resolving these risks. The goals of this activity are to exercise our development process at a modest scale and to probe our architecture plan for fundamental limits and failure modes. The product of the iterations will be the framework software which will be useful in future ICCS code. Thus the FY97 products are intended for internal usage by the ICCS team and for demonstration to the FEP software developers of the strategy for integrating supervisory software with FEP computers. This will be the first of several expected iterations of the software development process and the performance measurements that ICCS will demonstrate, intended to support confidence in our ability to meet project RAM goals. The design of the application software is being carried out in a separate WBS 1.5.2 activity. The design activity has as its FY97 product a series of Software Design Documents that will specify the functionality of the controls software of ICCS. During the testing of this year''s prototypes, the application functionality needed for test will be provided by sample maintenance controls. These are early precursors of controls that can be used for low level device control. Since the devices under test will be represented by

  4. 3 Years Experience with Energy Production on the Nissum Bredning Wave Dragon Prototype

    DEFF Research Database (Denmark)

    Frigaard, Peter; Tedd, James; Kofoed, Jens Peter

    2006-01-01

    Wave Dragon is a floating wave energy converter working by extracting energy principally by means of overtopping of waves into a reservoir. A 1:4.5 scale prototype has been sea tested for 20 months. This paper presents results from testing, experiences gained and developments made during this ext......Wave Dragon is a floating wave energy converter working by extracting energy principally by means of overtopping of waves into a reservoir. A 1:4.5 scale prototype has been sea tested for 20 months. This paper presents results from testing, experiences gained and developments made during...... this extended period. The prototype is highly instrumented. The overtopping characteristic and the power produced are presented here. This has enabled comparison between the prototype and earlier results from both laboratory model and computer simulation. This gives the optimal operating point and the expected...... power of the device. The project development team has gained much soft experience from working in the harsh offshore environment. In particular the effect of marine growth in the draft tubes of the turbines has been investigated. The control of the device has been a focus for development as is operates...

  5. Performance tests of a full scale prototype of the Belle II TOP counter with cosmic muons and 2.1 GeV/c positron beam

    Energy Technology Data Exchange (ETDEWEB)

    Hayakawa, Tomokatsu

    2014-12-01

    A time-of-propagation detector named TOP is a hadronic particle identification system for the Belle II experiment. We have produced a full scale prototype of the Belle II TOP counter and tested with cosmic muons at KEK and the 2.1 GeV/c positrons at SPring-8 LEPS beamline. The procedures for the quartz acceptance test and assembly worked well and the first quartz radiator was successfully fabricated. The obtained test data shows good agreement with Monte Carlo expectation. - Highlights: • We have successfully produced a full scale prototype of the Belle II TOP counter. • The prototype counter has been tested at KEK and SPring-8 LEPS beamline. • The obtained test data shows good agreement with Monte Carlo expectation.

  6. Are anticoagulant independent mechanical valves within reach-fast prototype fabrication and in vitro testing of innovative bi-leaflet valve models.

    Science.gov (United States)

    Scotten, Lawrence N; Siegel, Rolland

    2015-08-01

    Exploration for causes of prosthetic valve thrombogenicity has frequently focused on forward or post-closure flow detail. In prior laboratory studies, we uncovered high amplitude flow velocities of short duration close to valve closure implying potential for substantial shear stress with subsequent initiation of blood coagulation pathways. This may be relevant to widely accepted clinical disparity between mechanical and tissue valves vis-à-vis thrombogenicity. With a series of prototype bi-leaflet mechanical valves, we attempt reduction of closure related velocities with the objective of identifying a prototype valve with thrombogenic potential similar to our tissue valve control. This iterative design approach may find application in preclinical assessment of valves for anticoagulation independence. Tested valves included: prototype mechanical bi-leaflet BVs (n=56), controls (n=2) and patented early prototype mechanicals (n=2) from other investigators. Pulsatile and quasi-steady flow systems were used for testing. Projected dynamic valve area (PDVA) was measured using previously described novel technology. Flow velocity over the open and closing periods was determined by volumetric flow rate/PDVA. For the closed valve interval, use was made of data obtained from quasi-steady back pressure/flow tests. Performance was ranked by a proposed thrombogenicity potential index (TPI) relative to tissue and mechanical control valves. Optimization of the prototype valve designs lead to a 3-D printed model (BV3D). For the mitral/aortic site, BV3D has lower TPI (1.10/1.47) relative to the control mechanical valve (3.44/3.93) and similar to the control tissue valve (ideal TPI ≤1.0). Using unique technology, rapid prototyping and thrombogenicity ranking, optimization of experimental valves for reduced thrombogenic potential was expedited and simplified. Innovative mechanical valve configurations were identified that merit consideration for further development which may bring

  7. Experimental Test and Simulations on a Linear Generator-Based Prototype of a Wave Energy Conversion System Designed with a Reliability-Oriented Approach

    Directory of Open Access Journals (Sweden)

    Valeria Boscaino

    2017-01-01

    Full Text Available In this paper, we propose a reliability-oriented design of a linear generator-based prototype of a wave energy conversion (WEC, useful for the production of hydrogen in a sheltered water area like Mediterranean Sea. The hydrogen production has been confirmed by a lot of experimental testing and simulations. The system design is aimed to enhance the robustness and reliability and is based on an analysis of the main WEC failures reported in literature. The results of this analysis led to some improvements that are applied to a WEC system prototype for hydrogen production and storage. The proposed WEC system includes the electrical linear generator, the power conversion system, and a sea-water electrolyzer. A modular architecture is conceived to provide ease of extension of the power capability of the marine plant. The experimental results developed on the permanent magnet linear electric generator have allowed identification of the stator winding typology and, consequently, ability to size the power electronics system. The produced hydrogen has supplied a low-power fuel cell stack directly connected to the hydrogen output from the electrolyzer. The small-scale prototype is designed to be installed, in the near future, into the Mediterranean Sea. As shown by experimental and simulation results, the small-scale prototype is suitable for hydrogen production and storage from sea water in this area.

  8. Test results on systems developed for SST-1 tokamak

    International Nuclear Information System (INIS)

    Bora, D.

    2003-01-01

    used for heating the plasma while lower hybrid waves will be used for non inductive current drive (LHCD). A Neutral Beam Injection (NBI) with peak power of 0.8 MW with variable beam energy in range of 10-80 keV will be used as additional auxiliary heating system. A number of proto-types for various critical components have confirmed the fabrication methodology. The fabrication of most of the subsystems is nearing completion and many components have already been accepted at site. Erection and installation of the base of the mechanical structure has already been initiated in the SST hall. This paper reports on the results of the tests on various prototypes and actual components to be used on SST-1 for various subsystems. (author)

  9. Prototype tests for a highly granular scintillator-based hadronic calorimeter

    OpenAIRE

    Liu, Yong; Collaboration, for the CALICE

    2017-01-01

    Within the CALICE collaboration, several concepts for the hadronic calorimeter of a future lepton collider detector are studied. After having demonstrated the capabilities of the measurement methods in "physics prototypes", the focus now lies on improving their implementation in "technological prototypes", that are scalable to the full linear collider detector. The Analogue Hadronic Calorimeter (AHCAL) concept is a sampling calorimeter of tungsten or steel absorber plates and plastic scintill...

  10. Compton suppression tests on Ge and BGO prototype detectors for GAMMASPHERE

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, A M [Australian National Univ., Canberra, ACT (Australia); Khoo, T L; Bleich, M E; Carpenter, M P; Ahmad, I; Janssens, R V.F.; Moore, E F [Argonne National Lab., IL (United States); Bearden, I G [Purdue Univ., Lafayette, IN (United States); Beene, J R; Lee, I Y [Oak Ridge National Lab., TN (United States)

    1992-08-01

    In this paper, we report on measurements of the Compton suppression and overall P/T ratio of two Ge detectors in a BGO shield of the honeycomb pattern. These were the first prototype CSG detector assemblies for GAMMASPHERE. A more detailed description of these results will be published later. (author). 4 refs., 3 figs.

  11. Preliminary results of an in-beam PET prototype for proton therapy

    International Nuclear Information System (INIS)

    Attanasi, F.; Belcari, N.; Camarda, M.; Cirrone, G.A.P.; Cuttone, G.; Del Guerra, A.; Di Rosa, F.; Lanconelli, N.; Rosso, V.; Russo, G.; Vecchio, S.

    2008-01-01

    Proton therapy can overcome the limitations of conventional radiotherapy due to the more selective energy deposition in depth and to the increased biological effectiveness. Verification of the delivered dose is desirable, but the complete stopping of the protons in patient prevents the application of electronic portal imaging methods that are used in conventional radiotherapy During proton therapy β + emitters like 11 C, 15 O, 10 C are generated in irradiated tissues by nuclear reactions. The measurement of the spatial distribution of this activity, immediately after patient irradiation, can lead to information on the effective delivered dose. First, results of a feasibility study of an in-beam PET for proton therapy are reported. The prototype is based on two planar heads with an active area of about 5x5 cm 2 . Each head is made up of a position sensitive photomultiplier coupled to a square matrix of same size of LYSO scintillating crystals (2x2x18 mm 3 pixel dimensions). Four signals from each head are acquired through a dedicated electronic board that performs signal amplification and digitization. A 3D reconstruction of the activity distribution is calculated using an expectation maximization algorithm. To characterize the PET prototype, the detection efficiency and the spatial resolution were measured using a point-like radioactive source. The validation of the prototype was performed using 62 MeV protons at the CATANA beam line of INFN LNS and PMMA phantoms. Using the full energy proton beam and various range shifters, a good correlation between the position of the activity distal edge and the thickness of the beam range shifter was found along the axial direction

  12. Preliminary results of an in-beam PET prototype for proton therapy

    Science.gov (United States)

    Attanasi, F.; Belcari, N.; Camarda, M.; Cirrone, G. A. P.; Cuttone, G.; Del Guerra, A.; Di Rosa, F.; Lanconelli, N.; Rosso, V.; Russo, G.; Vecchio, S.

    2008-06-01

    Proton therapy can overcome the limitations of conventional radiotherapy due to the more selective energy deposition in depth and to the increased biological effectiveness. Verification of the delivered dose is desirable, but the complete stopping of the protons in patient prevents the application of electronic portal imaging methods that are used in conventional radiotherapy During proton therapy β + emitters like 11C, 15O, 10C are generated in irradiated tissues by nuclear reactions. The measurement of the spatial distribution of this activity, immediately after patient irradiation, can lead to information on the effective delivered dose. First, results of a feasibility study of an in-beam PET for proton therapy are reported. The prototype is based on two planar heads with an active area of about 5×5 cm 2. Each head is made up of a position sensitive photomultiplier coupled to a square matrix of same size of LYSO scintillating crystals (2×2×18 mm 3 pixel dimensions). Four signals from each head are acquired through a dedicated electronic board that performs signal amplification and digitization. A 3D reconstruction of the activity distribution is calculated using an expectation maximization algorithm. To characterize the PET prototype, the detection efficiency and the spatial resolution were measured using a point-like radioactive source. The validation of the prototype was performed using 62 MeV protons at the CATANA beam line of INFN LNS and PMMA phantoms. Using the full energy proton beam and various range shifters, a good correlation between the position of the activity distal edge and the thickness of the beam range shifter was found along the axial direction.

  13. Preliminary results of an in-beam PET prototype for proton therapy

    Energy Technology Data Exchange (ETDEWEB)

    Attanasi, F.; Belcari, N.; Camarda, M. [Department of Physics, University of Pisa and INFN Sezione di Pisa, Pisa (Italy); Cirrone, G.A.P.; Cuttone, G. [INFN Laboratori Nazionali del Sud, Catania (Italy); Del Guerra, A. [Department of Physics, University of Pisa and INFN Sezione di Pisa, Pisa (Italy); Di Rosa, F. [INFN Laboratori Nazionali del Sud, Catania (Italy); Lanconelli, N. [Department of Physics, University of Bologna and INFN Sezione di Bologna, Bologna (Italy); Rosso, V. [Department of Physics, University of Pisa and INFN Sezione di Pisa, Pisa (Italy)], E-mail: valeria.rosso@pi.infn.it; Russo, G. [INFN Laboratori Nazionali del Sud, Catania (Italy); Vecchio, S. [Department of Physics, University of Pisa and INFN Sezione di Pisa, Pisa (Italy)

    2008-06-11

    Proton therapy can overcome the limitations of conventional radiotherapy due to the more selective energy deposition in depth and to the increased biological effectiveness. Verification of the delivered dose is desirable, but the complete stopping of the protons in patient prevents the application of electronic portal imaging methods that are used in conventional radiotherapy During proton therapy {beta}{sup +} emitters like {sup 11}C, {sup 15}O, {sup 10}C are generated in irradiated tissues by nuclear reactions. The measurement of the spatial distribution of this activity, immediately after patient irradiation, can lead to information on the effective delivered dose. First, results of a feasibility study of an in-beam PET for proton therapy are reported. The prototype is based on two planar heads with an active area of about 5x5 cm{sup 2}. Each head is made up of a position sensitive photomultiplier coupled to a square matrix of same size of LYSO scintillating crystals (2x2x18 mm{sup 3} pixel dimensions). Four signals from each head are acquired through a dedicated electronic board that performs signal amplification and digitization. A 3D reconstruction of the activity distribution is calculated using an expectation maximization algorithm. To characterize the PET prototype, the detection efficiency and the spatial resolution were measured using a point-like radioactive source. The validation of the prototype was performed using 62 MeV protons at the CATANA beam line of INFN LNS and PMMA phantoms. Using the full energy proton beam and various range shifters, a good correlation between the position of the activity distal edge and the thickness of the beam range shifter was found along the axial direction.

  14. Prototype Software for Future Spaceflight Tested at Mars Desert Research Station

    Science.gov (United States)

    Clancey, William J.; Sierhuis, Maaretn; Alena, Rick; Dowding, John; Garry, Brent; Scott, Mike; Tompkins, Paul; vanHoof, Ron; Verma, Vandi

    2006-01-01

    NASA scientists in MDRS Crew 49 (April 23-May 7, 2006) field tested and significantly extended a prototype monitoring and advising system that integrates power system telemetry with a voice commanding interface. A distributed, wireless network of functionally specialized agents interacted with the crew to provide alerts (e.g., impending shut-down of inverter due to low battery voltage), access md interpret historical data, and display troubleshooting procedures. In practical application during two weeks, the system generated speech over loudspeakers and headsets lo alert the crew about the need to investigate power system problems. The prototype system adapts the Brahms/Mobile Agents toolkit to receive data from the OneMeter (Brand Electronics) electric metering system deployed by Crew 47. A computer on the upper deck was connected to loudspeakers, four others were paired with wireless (Bluetooth) headsets that enabled crew members to interact with their personal agents from anywhere in the hab. Voice commands and inquiries included: 1. What is the {battery | generator} {volts | amps | volts and amps}? 2. What is the status of the {generator | inverter | battery | solar panel}? 3. What is the hab{itat} {power usage | volts | voltage | amps | volts and amps}? 4. What was the average hab{itat} {amps | volts | voltage} since {AM | PM)? 5. When did the {generator | batteries} change status? 6. Tell {me I | everyone} when{ ever} the generator goes offline. 7. Tell {me | | everyone} when the hab{itat} {amps | volts | voltage} {exceeds | drops brelow} . 8. {Send | Take | Record} {a} voice note {(for | to} } {at }. This research demonstrates the principles of design in the context of use, investigating requirements through experimental use of prototype systems in an analog setting, and use of MDRS as a research facility for designing and implementing new systems.

  15. Field test and evaluation of the passive neutron coincidence collar for prototype fast reactor fuel subassemblies

    International Nuclear Information System (INIS)

    Menlove, H.O.; Keddar, A.

    1982-08-01

    The passive neutron Coincidence Collar, which was developed for the verification of plutonium content in fast reactor fuel subassemblies, has been field tested using Prototype Fast Reactor fuel. For passive applications, the system measures the 240 Pu-effective mass from the spontaneous fission rate, and in addition, a self-interrogation technique is used to determine the fissile content in the subassembly. Both the passive and active modes were evaluated at the Windscale Works in the United Kingdom. The results of the tests gave a standard deviation 0.75% for the passive count and 3 to 7% for the active measurement for a 1000-s counting time. The unit will be used in the future for the verification of plutonium in fresh fuel assemblies

  16. Test Beam Results of Geometry Optimized Hybrid Pixel Detectors

    CERN Document Server

    Becks, K H; Grah, C; Mättig, P; Rohe, T

    2006-01-01

    The Multi-Chip-Module-Deposited (MCM-D) technique has been used to build hybrid pixel detector assemblies. This paper summarises the results of an analysis of data obtained in a test beam campaign at CERN. Here, single chip hybrids made of ATLAS pixel prototype read-out electronics and special sensor tiles were used. They were prepared by the Fraunhofer Institut fuer Zuverlaessigkeit und Mikrointegration, IZM, Berlin, Germany. The sensors feature an optimized sensor geometry called equal sized bricked. This design enhances the spatial resolution for double hits in the long direction of the sensor cells.

  17. Test of prototype liquid-water-content meter for aircraft use

    Science.gov (United States)

    Gerber, Hermann E.

    1993-01-01

    This report describes the effort undertaken to meet the objectives of National Science Foundation Grant ATM-9207345 titled 'Test of Prototype Liquid-Water-Content Meter for Aircraft Use.' Three activities were proposed for testing the new aircraft instrument, PVM-100A: (1) Calibrate the PVM-100A in a facility where the liquid-water-content (LWC) channel, and the integrated surface area channel (PSA) could be compared to standard means for LWC and PSA measurements. Scaling constant for the channels were to be determined in this facility. The fog/wind tunnel at ECN, Petten, The Netherlands was judged the most suitable facility for this effort. (2) Expose the PVM-100A to high wind speeds similar to those expected on research aircraft, and test the anti-icing heaters on the PVM-100A under typical icing conditions expected in atmospheric clouds. The high-speed icing tunnel at NRC, Ottawa, Canada was to be utilized. (3) Operate the PVM-100A on an aircraft during cloud penetrations to determine its stability and practicality for such measurements. The C-131A aircraft of the University of Washington was the aircraft of opportunity for these-tests, which were to be conducted during the 4-week Atlantic Stratocumulus Transition Experiment (ASTEX) in June of 1992.

  18. SU-F-T-213: Commissioning Results of the Prototype Active Scanning Irradiation System of Korea Heavy Ion Medical Accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Kim, C; Seduk, J; Yang, T [Korea Institute of Radiological And Medical Sciences, Seoul, Seoul (Korea, Republic of)

    2016-06-15

    Purpose: A prototype actives scanning beam delivery system was designed, manufactured and installed as a part of the Korea Heavy Ion Medical Accelerator Project. The prototype system includes the most components for steering, modulating, detecting incident beam to patient. The system was installed in MC-50 cyclotron beam line and tested to extract the normal operation conditions. Methods: The commissioning process was completed by using 45 MeV of proton beam. To measure the beam position accuracy along the scanning magnet power supply current, 25 different spots were scanning and measured. The scanning results on GaF film were compared with the irradiation plan. Also, the beam size variation and the intensity reduction using range shifter were measured and analyzed. The results will be used for creating a conversion factors for asymmetric behavior of scanning magnets and a dose compensation factor for longitudinal direction. Results: The results show asymmetry operations on both scanning × and y magnet. In case of scanning magnet × operation, the current to position conversion factors were measured 1.69 mm/A for positive direction and 1.74 mm/A for negative direction. The scanning magnet y operation shows 1.38mm/A and 1.48 mm/A for both directions. The size of incoming beam which was 18 mm as sigma becomes larger up to 55 mm as sigma while using 10 mm of the range shifter plate. As the beam size becomes large, the maximum intensity of the was decreased. In case of using 10 mm of range shifter, the maximum intensity was only 52% compared with no range shifter insertion. Conclusion: For the appropriate operation of the prototype active scanning system, the commissioning process were performed to measure the beam characteristics variation. The obtained results would be applied on the irradiation planning software for more precise dose delivery using the active scanning system.

  19. Construction and test of a full-scale prototype of an ATLAS muon spectrometer tracking chamber

    International Nuclear Information System (INIS)

    Biscossa, A.; Cambiaghi, M.; Conta, C.; Ferrari, R.; Fraternali, M.; Freddi, A.; Iuvino, G.; Lanza, A.; Livan, M.; Negri, A.; Polesello, G.; Rimoldi, A.; Vercellati, F.; Vercesi, V.; Bagnaia, P.; Bini, C.; Capradossi, G.; Ciapetti, G.; Creti, P.; De Zorzi, G.; Iannone, M.; Lacava, F.; Mattei, A.; Nisati, L.; Oberson, P.; Pontecorvo, L.; Rosati, S.; Veneziano, S.; Zullo, A.; Daly, C.H.; Davisson, R.; Guldenmann, H.; Lubatti, H.J.; Zhao, T.

    1999-01-01

    We have built a full scale prototype of the precision tracking chambers (Monitored Drift Tubes, MDT) for the muon spectrometer of the Atlas Experiment at the LHC collider. This article describes in detail the procedures used in constructing the drift tubes and in assembling the chamber. It presents data showing that the required mechanical precision has been achieved as well as test beam results displaying the over all chamber performance. The article presents data demonstrating the derivation of the space-time relation of the drift tubes by the autocalibration procedure using real data from the tracks crossing the chamber. Autocalibration is the procedure which must be used during run time

  20. DESIGN AND PROTOTYPE OF A SUSTAINABLE EGG-WASHER

    Science.gov (United States)

    This project is part of the senior design course for Engineering Science and Mechanics at Virginia Tech. Anticipated results will be a working prototype chosen from multiple designs. We will include test results supporting our selection. We will characterize the stresses ex...

  1. Evaluation of a prototype infrasound system

    International Nuclear Information System (INIS)

    Whitaker, R.; Sandoval, T.; Breding, D.; Kromer, D.

    1997-01-01

    Under Department of Energy sponsorship, Sandia National Laboratories and Los Alamos National Laboratory cooperated to develop a prototype infrasonic array, with associated documentation, that could be used as part of the International Monitoring System. The United States Government or foreign countries could procure commercially available systems based on this prototype to fulfill their Comprehensive Test Ban Treaty (CTBT) obligations. The prototype is a four-element array in a triangular layout as recommended in CD/NTB/WP.224 with an element at each corner and one in the center. The prototype test configuration utilize an array spacing of 1 km. The prototype infrasound system has the following objectives: (1) Provide a prototype that reliably acquires and transmits near real-time infrasonic data to facilitate the rapid location and identification of atmospheric events. (2) Provide documentation that could be used by the United States and foreign countries to procure infrasound systems commercially to fulfill their CTBT responsibilities. Infrasonic monitoring is an effective, low cost technology for detecting atmospheric explosions. The low frequency components of explosion signals propagate to long ranges (few thousand kilometers) where they can be detected with an array of sensors. Los Alamos National Laboratory's expertise in infrasound systems and phenomenology when combined with Sandia's expertise in providing verification quality system for treaty monitoring make an excellent team to provide the prototype infrasound sensor system. By September 1997, the prototype infrasound system will have been procured, integrated, evaluated and documented. Final documentation will include a system requirements document, an evaluation report and a hardware design document. The hardware design document will describe the various hardware components used in the infrasound prototype and their interrelationships

  2. Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  3. A Smartphone App for Families With Preschool-Aged Children in a Public Nutrition Program: Prototype Development and Beta-Testing

    Science.gov (United States)

    Emerson, Janice S; Quirk, Meghan E; Canedo, Juan R; Jones, Jessica L; Vylegzhanina, Violetta; Schmidt, Douglas C; Mulvaney, Shelagh A; Beech, Bettina M; Briley, Chiquita; Harris, Calvin; Husaini, Baqar A

    2017-01-01

    Background The Special Supplemental Nutrition Program for Women, Infants, and Children (WIC) in the United States provides free supplemental food and nutrition education to low-income mothers and children under age 5 years. Childhood obesity prevalence is higher among preschool children in the WIC program compared to other children, and WIC improves dietary quality among low-income children. The Children Eating Well (CHEW) smartphone app was developed in English and Spanish for WIC-participating families with preschool-aged children as a home-based intervention to reinforce WIC nutrition education and help prevent childhood obesity. Objective This paper describes the development and beta-testing of the CHEW smartphone app. The objective of beta-testing was to test the CHEW app prototype with target users, focusing on usage, usability, and perceived barriers and benefits of the app. Methods The goals of the CHEW app were to make the WIC shopping experience easier, maximize WIC benefit redemption, and improve parent snack feeding practices. The CHEW app prototype consisted of WIC Shopping Tools, including a barcode scanner and calculator tools for the cash value voucher for purchasing fruits and vegetables, and nutrition education focused on healthy snacks and beverages, including a Yummy Snack Gallery and Healthy Snacking Tips. Mothers of 63 black and Hispanic WIC-participating children ages 2 to 4 years tested the CHEW app prototype for 3 months and completed follow-up interviews. Results Study participants testing the app for 3 months used the app on average once a week for approximately 4 and a half minutes per session, although substantial variation was observed. Usage of specific features averaged at 1 to 2 times per month for shopping-related activities and 2 to 4 times per month for the snack gallery. Mothers classified as users rated the app’s WIC Shopping Tools relatively high on usability and benefits, although variation in scores and qualitative

  4. Harnessing scientific literature reports for pharmacovigilance. Prototype software analytical tool development and usability testing.

    Science.gov (United States)

    Sorbello, Alfred; Ripple, Anna; Tonning, Joseph; Munoz, Monica; Hasan, Rashedul; Ly, Thomas; Francis, Henry; Bodenreider, Olivier

    2017-03-22

    We seek to develop a prototype software analytical tool to augment FDA regulatory reviewers' capacity to harness scientific literature reports in PubMed/MEDLINE for pharmacovigilance and adverse drug event (ADE) safety signal detection. We also aim to gather feedback through usability testing to assess design, performance, and user satisfaction with the tool. A prototype, open source, web-based, software analytical tool generated statistical disproportionality data mining signal scores and dynamic visual analytics for ADE safety signal detection and management. We leveraged Medical Subject Heading (MeSH) indexing terms assigned to published citations in PubMed/MEDLINE to generate candidate drug-adverse event pairs for quantitative data mining. Six FDA regulatory reviewers participated in usability testing by employing the tool as part of their ongoing real-life pharmacovigilance activities to provide subjective feedback on its practical impact, added value, and fitness for use. All usability test participants cited the tool's ease of learning, ease of use, and generation of quantitative ADE safety signals, some of which corresponded to known established adverse drug reactions. Potential concerns included the comparability of the tool's automated literature search relative to a manual 'all fields' PubMed search, missing drugs and adverse event terms, interpretation of signal scores, and integration with existing computer-based analytical tools. Usability testing demonstrated that this novel tool can automate the detection of ADE safety signals from published literature reports. Various mitigation strategies are described to foster improvements in design, productivity, and end user satisfaction.

  5. Initial results of the FUSION-X-US prototype combining 3D automated breast ultrasound and digital breast tomosynthesis.

    Science.gov (United States)

    Schaefgen, Benedikt; Heil, Joerg; Barr, Richard G; Radicke, Marcus; Harcos, Aba; Gomez, Christina; Stieber, Anne; Hennigs, André; von Au, Alexandra; Spratte, Julia; Rauch, Geraldine; Rom, Joachim; Schütz, Florian; Sohn, Christof; Golatta, Michael

    2018-06-01

    To determine the feasibility of a prototype device combining 3D-automated breast ultrasound (ABVS) and digital breast tomosynthesis in a single device to detect and characterize breast lesions. In this prospective feasibility study, the FUSION-X-US prototype was used to perform digital breast tomosynthesis and ABVS in 23 patients with an indication for tomosynthesis based on current guidelines after clinical examination and standard imaging. The ABVS and tomosynthesis images of the prototype were interpreted separately by two blinded experts. The study compares the detection and BI-RADS® scores of breast lesions using only the tomosynthesis and ABVS data from the FUSION-X-US prototype to the results of the complete diagnostic workup. Image acquisition and processing by the prototype was fast and accurate, with some limitations in ultrasound coverage and image quality. In the diagnostic workup, 29 solid lesions (23 benign, including three cases with microcalcifications, and six malignant lesions) were identified. Using the prototype, all malignant lesions were detected and classified as malignant or suspicious by both investigators. Solid breast lesions can be localized accurately and fast by the Fusion-X-US system. Technical improvements of the ultrasound image quality and ultrasound coverage are needed to further study this new device. The prototype combines tomosynthesis and automated 3D-ultrasound (ABVS) in one device. It allows accurate detection of malignant lesions, directly correlating tomosynthesis and ABVS data. The diagnostic evaluation of the prototype-acquired data was interpreter-independent. The prototype provides a time-efficient and technically reliable diagnostic procedure. The combination of tomosynthesis and ABVS is a promising diagnostic approach.

  6. First Results with the Prototype Detectors of the Si/W ECAL

    Energy Technology Data Exchange (ETDEWEB)

    Strom, D; Frey, R.; /Oregon U.; Breidenbach, M.; Deng, J.; Freytag, D.; Graf, N.; Haller, G.; /SLAC; Radeka, V.; /Brookhaven

    2005-07-12

    Measurements on the prototype silicon sensors for use with an electromagnetic calorimeter with tungsten absorber are reported. The prototype sensors are based on a hexagonal geometry that optimally utilizes the space available on 6 inch silicon wafers. The sensors are segmented into approximately 750 5mm hexagonal pixels, which are connected to a bump-bonding array located at the center of the sensors. We report on those properties of the sensors that are important for linear collider applications including depletion voltage, stray capacitance and series resistance.

  7. Comparative prediction of irradiation test of CNFT and Cise prototypes of CIRENE fuel pins, a prediction by transuranus M1V1J12 code

    International Nuclear Information System (INIS)

    Suwardi

    2014-01-01

    A prototype of fuel pin design for HWR by CIRENE has been realized by Center for Nuclear Fuel Technology CNFT-BATAN. The prototype will be irradiated in PRTF Power Ramp Test (PRTF). The facility has been installed inside RSG-GA Siwabessy at Serpong. The present paper reports the preparation of experimentation and prediction of irradiation test. One previous PCI test report is found in, written by Lysell G and Valli G in 1973. The CNFT fuel irradiation test parameter is adapted to both PRTF and power loop design for RSG-GAS reactor in Serpong mainly the maxima of: rod length, neutrons flux, total power of rod, and power ramp rate. The CNFT CIRENE prototype design has been reported by Futichah et al 2007 and 2010. The AEC-India HWR fuel pin is of 19/22 fuel bundle design has also been evaluated as comparison. The first PCI test prediction has experiment comparison for Cise pin. The second prediction will be used for optimizing the design of ramp test for CNFT CIRENE fuel pin prototype. (author)

  8. Solution Prototype

    DEFF Research Database (Denmark)

    Efeoglu, Arkin; Møller, Charles; Serie, Michel

    2013-01-01

    This paper outlines an artifact building and evaluation proposal. Design Science Research (DSR) studies usually consider encapsulated artifact that have relationships with other artifacts. The solution prototype as a composed artifact demands for a more comprehensive consideration in its systematic...... environment. The solution prototype that is composed from blending product and service prototype has particular impacts on the dualism of DSR’s “Build” and “Evaluate”. Since the mix between product and service prototyping can be varied, there is a demand for a more agile and iterative framework. Van de Ven......’s research framework seems to fit this purpose. Van de Ven allows for an iterative research approach to problem solving with flexible starting point. The research activity is the result between the iteration of two dimensions. This framework focuses on the natural evaluation, particularly on ex...

  9. Performances and long-term stability of the LHAASO-KM2A prototype array

    International Nuclear Information System (INIS)

    Liu Jia; Sheng XiangDong; He Huihai; Zhao Jing; Chang Jinfan; Gu Minhao; Hou Chao; Lu Hongkui

    2014-01-01

    A prototype array for the LHAASO-KM2A, which consists of 42 detector units and fully overlaps the ARGO-YBJ experiment, was set up at the Yangbajing cosmic ray observatory and has been in stable operation since October 2010. The resulting performances of the KM2A electromagnetic particle detector prototypes fully meet the design requirements. Through hybrid observation of cosmic ray showers with the ARGO-YBJ experiment, the performances and long-term stability of the prototype array are tested and the results are consistent with expectation. The cosmic ray moon shadow observed by the prototype array is also presented. (authors)

  10. Fabrication and Testing of the SRF Cavities for the CEBAF 12 GeV Upgrade Prototype Cryomodule Renascence

    International Nuclear Information System (INIS)

    Charles Reece; Edward Daly; Stephen Manning; Robert Manus; Samuel Morgan; Joseph Ozelis; Larry Turlington

    2005-01-01

    Twelve seven-cell niobium cavities for the CEBAF 12 GeV upgrade prototype cryomodule Renascence have been fabricated at JLab and tested individually. This set includes four of the ''Low Loss'' (LL) design and eight of the ''High Gradient'' (HG) design. The fabrication strategy was an efficient mix of batch job-shop component machining and in-house EBW, chemistry, and final-step machining to meet mechanical tolerances. Process highlights will be presented. The cavities have been tested at 2.07 K, the intended CEBAF operating temperature. Performance exceeded the tentative design requirement of 19.2 MV/m cw with less than 29 W dynamic heat dissipation. These results, as well as the HOM damping performance will be presented

  11. Fabrication and Testing of the SRF cavities for the CEBAF 12 GeV Upgrade Prototype Cryomodule Renascence

    International Nuclear Information System (INIS)

    C. E. Reece; E. F. Daly; S. Manning; R. Manus; S. Morgan; J. P. Ozelis; L. Turlington

    2005-01-01

    Twelve seven-cell niobium cavities for the CEBAF 12 GeV upgrade prototype cryomodule Renascence have been fabricated at JLab and tested individually. This set includes four of the ''Low Loss'' (LL) design and eight of the ''High Gradient'' (HG) design. The fabrication strategy was an efficient mix of batch job-shop component machining and in-house EBW, chemistry, and final-step machining to meet mechanical tolerances. Process highlights will be presented. The cavities have been tested at 2.07 K, the intended CEBAF operating temperature. Performance exceeded the tentative design requirement of 19.2 MV/m CW with less than 29 W dynamic heat dissipation. These results, as well as the HOM damping performance are presented

  12. MOTION STUDY OF A WHEELCHAIR PROTOTYPE FOR DISABLED PEOPLE

    Directory of Open Access Journals (Sweden)

    Ionut GEONEA

    2015-05-01

    Full Text Available In this paper is presented the design and experimental prototype of a wheelchair for disabled people. Design solution proposed to be implemented uses two reduction gears motors and a mechanical transmission with chains. The motion controller developed uses PWM technology (pulse wave modulation. The wheelchair has the ability of forward – backward motion and steering. The design solution is developed in Solid Works, and it’s implemented to a wheelchair prototype model. Wheelchair design and motion makes him suitable especially for indoor use. It is made a study of the wheelchair kinematics, first using a kinematic simulation in Adams. Are presented the wheelchair motion trajectory and kinematics parameters. The experimental prototype is tested with a motion analysis system based on ultra high speed video recording. The obtained results from simulation and experimentally tests, demonstrate the efficiency of wheelchair proposed solution.

  13. Neural basis of scientific innovation induced by heuristic prototype.

    Directory of Open Access Journals (Sweden)

    Junlong Luo

    Full Text Available A number of major inventions in history have been based on bionic imitation. Heuristics, by applying biological systems to the creation of artificial devices and machines, might be one of the most critical processes in scientific innovation. In particular, prototype heuristics propositions that innovation may engage automatic activation of a prototype such as a biological system to form novel associations between a prototype's function and problem-solving. We speculated that the cortical dissociation between the automatic activation and forming novel associations in innovation is critical point to heuristic creativity. In the present study, novel and old scientific innovations (NSI and OSI were selected as experimental materials in using learning-testing paradigm to explore the neural basis of scientific innovation induced by heuristic prototype. College students were required to resolve NSI problems (to which they did not know the answers and OSI problems (to which they knew the answers. From two fMRI experiments, our results showed that the subjects could resolve NSI when provided with heuristic prototypes. In Experiment 1, it was found that the lingual gyrus (LG; BA18 might be related to prototype heuristics in college students resolving NSI after learning a relative prototype. In Experiment 2, the LG (BA18 and precuneus (BA31 were significantly activated for NSI compared to OSI when college students learned all prototypes one day before the test. In addition, the mean beta-values of these brain regions of NSI were all correlated with the behavior accuracy of NSI. As our hypothesis indicated, the findings suggested that the LG might be involved in forming novel associations using heuristic information, while the precuneus might be involved in the automatic activation of heuristic prototype during scientific innovation.

  14. Neural basis of scientific innovation induced by heuristic prototype.

    Science.gov (United States)

    Luo, Junlong; Li, Wenfu; Qiu, Jiang; Wei, Dongtao; Liu, Yijun; Zhang, Qinlin

    2013-01-01

    A number of major inventions in history have been based on bionic imitation. Heuristics, by applying biological systems to the creation of artificial devices and machines, might be one of the most critical processes in scientific innovation. In particular, prototype heuristics propositions that innovation may engage automatic activation of a prototype such as a biological system to form novel associations between a prototype's function and problem-solving. We speculated that the cortical dissociation between the automatic activation and forming novel associations in innovation is critical point to heuristic creativity. In the present study, novel and old scientific innovations (NSI and OSI) were selected as experimental materials in using learning-testing paradigm to explore the neural basis of scientific innovation induced by heuristic prototype. College students were required to resolve NSI problems (to which they did not know the answers) and OSI problems (to which they knew the answers). From two fMRI experiments, our results showed that the subjects could resolve NSI when provided with heuristic prototypes. In Experiment 1, it was found that the lingual gyrus (LG; BA18) might be related to prototype heuristics in college students resolving NSI after learning a relative prototype. In Experiment 2, the LG (BA18) and precuneus (BA31) were significantly activated for NSI compared to OSI when college students learned all prototypes one day before the test. In addition, the mean beta-values of these brain regions of NSI were all correlated with the behavior accuracy of NSI. As our hypothesis indicated, the findings suggested that the LG might be involved in forming novel associations using heuristic information, while the precuneus might be involved in the automatic activation of heuristic prototype during scientific innovation.

  15. Control and Non-Payload Communications (CNPC) Prototype Radio - Generation 2 Security Flight Test Report

    Science.gov (United States)

    Iannicca, Dennis C.; Ishac, Joseph A.; Shalkhauser, Kurt A.

    2015-01-01

    NASA Glenn Research Center (GRC), in cooperation with Rockwell Collins, is working to develop a prototype Control and Non-Payload Communications (CNPC) radio platform as part of NASA Integrated Systems Research Program's (ISRP) Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. A primary focus of the project is to work with the Federal Aviation Administration (FAA) and industry standards bodies to build and demonstrate a safe, secure, and efficient CNPC architecture that can be used by industry to evaluate the feasibility of deploying a system using these technologies in an operational capacity. GRC has been working in conjunction with these groups to assess threats, identify security requirements, and to develop a system of standards-based security controls that can be applied to the GRC prototype CNPC architecture as a demonstration platform. The proposed security controls were integrated into the GRC flight test system aboard our S-3B Viking surrogate aircraft and several network tests were conducted during a flight on November 15th, 2014 to determine whether the controls were working properly within the flight environment. The flight test was also the first to integrate Robust Header Compression (ROHC) as a means of reducing the additional overhead introduced by the security controls and Mobile IPv6. The effort demonstrated the complete end-to-end secure CNPC link in a relevant flight environment.

  16. First Study Of HEPA Filter Prototype Performance To Control The Airborne Pollution

    International Nuclear Information System (INIS)

    Soetomo; Suwarno

    2000-01-01

    This paper will report the efficiency test result of the filtration tool prototype of High Efficiency Particulate Air (HEPA filter) for low temperature, to control the airborne pollution of aerosol particle of solid and liquid. The prototype design of HEPA filter was based on the characteristic data of filter material (fibrous diameter, density, filter thickness), flow rate of air and first pressure drop. From the result of laboratory scale test, using DOP/PSL aerosol with 0,3 mum diameter and the flow rate of 3,78 m exp.3/min, was obtained filtration efficiency revolve between 89,90 and 99,94 % for the filter prototype of A, B, C, and D. the efficiency estimation of theory with filtration programme and the experiment was different amount 1 %. The value of the prototype efficiency of D filter was not far different with AAF-USA filter and its price is cheaper 30 % than the price of AAF-USA filter

  17. NeuLAND MRPC-based detector prototypes tested with fast neutrons

    Energy Technology Data Exchange (ETDEWEB)

    Caesar, C., E-mail: c.caesar@gsi.de [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Aumann, T. [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Bemmerer, D. [Forschungszentrum Dresden-Rossendorf, Dresden (Germany); Boretzky, K. [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Elekes, Z. [Forschungszentrum Dresden-Rossendorf, Dresden (Germany); ATOMKI, Debrecen (Hungary); Gonzalez-Diaz, D.; Hehner, J.; Heil, M. [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Kempe, M. [Forschungszentrum Dresden-Rossendorf, Dresden (Germany); Maroussov, V. [Universitaet zu Koeln, Koeln (Germany); Nusair, O. [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Al-Balqa Applied University, Salt (Jordan); Reifarth, R.; Rossi, D.; Simon, H. [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Stach, D.; Wagner, A.; Yakorev, D. [Forschungszentrum Dresden-Rossendorf, Dresden (Germany); Zilges, A. [ATOMKI, Debrecen (Hungary)

    2012-01-01

    Recent results from a first irradiation of multi-gap resistive plate chambers with fast neutrons are presented. The counters have been built at GSI and FZD. The experiment was performed at the 'The Svedberg Laboratory' (TSL) in Uppsala, Sweden, utilizing a quasi-monoenergetic neutron beam with an energy E{sub n}=175 MeV. For a 2 Multiplication-Sign 4 gap prototype operated at E=100 kV/cm, an efficiency of (0.77 {+-}0.33)% was measured.

  18. Test and Evaluation Station (TESt) - A Control System for the ALICE-HMPID Liquid Distribution Prototype

    CERN Document Server

    Maatta, E; CERN. Geneva; Swoboda, Detlef; Lecoeur, G

    1999-01-01

    The sub-detectors and systems in the ALICE experiment [1] are of various types. However, during physics runs, all devices necessary for the operation of the detector must be accessible and controllable through a common computer interface. Throughout all other periods each sub-detector requires maintenance, upgrading or test operation. To this end, an access independant of other sub-detectors must be guaranteed. These basic requirements impose a fair number of constraints on the architecture and components of the Detector Control System (DCS). The purpose of the TESt project consisted in the construction of a stand alone unit for a specific sub-system of an ALICE detector in order to gain first experience with commercial products for detector control. Although the control system includes only a small number of devices and is designed for a particular application, it covers nevertheless all layers of a complete system and can be extended or used in different applications. The control system prototype has been...

  19. PSC/PSI power supply control prototype based on RTEMS

    International Nuclear Information System (INIS)

    Shi Haoli; Wang Chunhong; Tang Jingyu

    2010-01-01

    A PSC/PSI power supply control prototype was developed by using an open-source real-time operating system RTEMS and PSC/PSI power supply controller developed by BNL. The structure of the prototype, development procedures as well as testing result with a power supply of a corrector magnet were described. It can switch on/off the power supply, ramp up/down the current, and monitor the real-time states of the power supply. (authors)

  20. Synopsis of the results of ISP-39 on FARO test L-14

    Energy Technology Data Exchange (ETDEWEB)

    Addabbo, C.; Annunziato, A.; Magallon, D. [Commission of the European Communities, Ispra (Italy). Joint Research Center

    1998-01-01

    This paper provides a synopsis of the salient results from the ISP(International Standard Problem)-39 exercise promoted by OECD-CSNI in the frame of the NEA activities aimed at fostering international cooperation in reactor safety research and development. ISP-39 has been conceived to benchmark the predictive capabilities of computer codes used in the evaluation of FCI and quenching phenomenologies of relevance in water cooled reactors severe accidents safety analysis. The ISP-39 reference case is FARO test L-14, a non-energetic FCI test performed in the FARO experimental installation under realistic melt composition and prototypical test conditions. (author)

  1. Damping Estimation of a Prototype Bucket Foundation for Offshore Wind Turbines Identified by Full Scale Testing

    DEFF Research Database (Denmark)

    Damgaard, Mads; Ibsen, Lars Bo; Andersen, Lars Vabbersgaard

    2013-01-01

    -3.0 MW offshore wind turbine installed on a prototype bucket foundation. The foundation and the turbine tower are equipped with a monitoring system with 15 Kinemetrics force balance accelerometers and a Digitexx acquisition system. Using free vibration decays from “rotor-stop” tests and operational modal...

  2. Hollow Fiber Space Water Membrane Evaporator Flight Prototype Design and Testing

    Science.gov (United States)

    Bue, Grant C.; Makinen, Janice; Vogel, Mtthew; Honas, Matt; Dillon, Paul; Colunga, Aaron; Truong, Lily; Porwitz, Darwin; Tsioulos, Gus

    2011-01-01

    The spacesuit water membrane evaporator (SWME) is being developed to perform thermal control for advanced spacesuits and to take advantage of recent advances in micropore membrane technology. This results in a robust heat-rejection device that is potentially less sensitive to contamination than is the sublimator. The current design was based on a previous design that grouped the fiber layers into stacks, which were separated by small spaces and packaged into a cylindrical shape. This was developed into a full-scale prototype consisting of 14,300 tube bundled into 30 stacks, each of which is formed into a chevron shape and separated by spacers and organized into three sectors of 10 nested stacks. The new design replaced metal components with plastic ones, eliminated the spacers, and has a custom built flight like backpressure valve mounted on the side of the SWME housing to reduce backpressure when fully open. A number of tests were performed in order to improve the strength of the polyurethane header that holds the fibers in place while the system is pressurized. Vacuum chamber testing showed similar heat rejection as a function of inlet water temperature and water vapor backpressure was similar to the previous design. Other tests pushed the limits of tolerance to freezing and showed suitability to reject heat in a Mars pressure environment with and without a sweep gas. Tolerance to contamination by constituents expected to be found in potable water produced by distillation processes was tested in a conventional way by allowing constituents to accumulate in the coolant as evaporation occurs. For this purpose, the SWME cartridge has endured an equivalent of 30 EVAs exposure and demonstrated acceptable performance decline.

  3. The use of an automated flight test management system in the development of a rapid-prototyping flight research facility

    Science.gov (United States)

    Duke, Eugene L.; Hewett, Marle D.; Brumbaugh, Randal W.; Tartt, David M.; Antoniewicz, Robert F.; Agarwal, Arvind K.

    1988-01-01

    An automated flight test management system (ATMS) and its use to develop a rapid-prototyping flight research facility for artificial intelligence (AI) based flight systems concepts are described. The ATMS provides a flight test engineer with a set of tools that assist in flight planning and simulation. This system will be capable of controlling an aircraft during the flight test by performing closed-loop guidance functions, range management, and maneuver-quality monitoring. The rapid-prototyping flight research facility is being developed at the Dryden Flight Research Facility of the NASA Ames Research Center (Ames-Dryden) to provide early flight assessment of emerging AI technology. The facility is being developed as one element of the aircraft automation program which focuses on the qualification and validation of embedded real-time AI-based systems.

  4. Tests of the new STIC scintillator ring prototype, the photomultipliers and optic fibers cables of the 40 deg C counters

    International Nuclear Information System (INIS)

    Silva, Tatiana da

    1997-01-01

    This paper reports the tests performed on the semicircular prototype of the new scintillator ring with readings obtained by WLS optic fibers. The prototype intends to verify the light collecting and investigate a method for fiber gluing in a circular surface, without the appearing of air bubbles which may restrain the light transmission. Also the optic fiber cables and the photomultipliers used in the 40 deg C counters have been tested in order to verify the electromagnetic energy which may leak from failures in the barrel, aiming the hermeticity enhancement, and also the existence of any damaged cable

  5. Development and test of prototype components for ITER; Entwicklung und Test von Prototypkomponenten fuer ITER

    Energy Technology Data Exchange (ETDEWEB)

    Biel, Wolfgang; Behr, Wilfried; Castano-Bardawil, David; and others

    2015-08-15

    The scientific program of the project is divided into the following partial projects: (1.) ITER Diagnostic Port Plug for the charge-exchange spectroscopy (CXRS) with the subthemes: (a) Development of prototypes for critical mechanical components, (b) development of a roboter for the laser welding of vacuum seals and pipings at the Port Plug, (c) mirror studies, (d) CXRS prototype spectrometer, (2.) ITER tritium retention diagnostics (TR), (3.) ITER disruption mitigation ventile (DMV).

  6. SLAC FASTBUS Snoop Module: test results and support software

    International Nuclear Information System (INIS)

    Gustavson, D.B.; Walz, H.V.

    1985-09-01

    The development of a diagnostic module for FASTBUS has been completed. The Snoop Module is designed to reside on a Crate Segment and provide high-speed diagnostic monitoring and testing capabilities. Final hardware details and testing of production prototype modules are reported. Features of software under development for a stand-alone single Snoop diagnostic system and Multi-Snoop networks will be discussed. 3 refs., 2 figs

  7. Aespoe Hard Rock Laboratory. Prototype Repository. Acoustic emission and ultrasonic monitoring results from deposition hole DA3545G01 in the Prototype Repository between October 2007 and March 2008

    Energy Technology Data Exchange (ETDEWEB)

    Duckworth, D.; Haycox, J.; Pettitt, W.S. (Applied Seismology Consultants, Shrewsbury (United Kingdom))

    2008-12-15

    This report describes results from acoustic emission (AE) and ultrasonic monitoring around a canister deposition hole (DA3545G01) in the Prototype Repository Experiment at SKB's Hard Rock Laboratory (HRL), Sweden. The experiment has been designed to simulate a disposal tunnel in a real deep repository environment for storage of high-level radioactive waste. The test consists of a 90 m long, 5 m diameter subhorizontal tunnel excavated in dioritic granite. The monitoring aims to examine changes in the rock mass caused by an experimental repository environment, in particular due to thermal stresses induced from canister heating and pore pressures induced from tunnel sealing.

  8. Aespoe Hard Rock Laboratory. Prototype Repository. Acoustic emission and ultrasonic monitoring results from deposition hole DA3545G01 in the Prototype Repository between October 2007 and March 2008

    International Nuclear Information System (INIS)

    Duckworth, D.; Haycox, J.; Pettitt, W.S.

    2008-12-01

    This report describes results from acoustic emission (AE) and ultrasonic monitoring around a canister deposition hole (DA3545G01) in the Prototype Repository Experiment at SKB's Hard Rock Laboratory (HRL), Sweden. The experiment has been designed to simulate a disposal tunnel in a real deep repository environment for storage of high-level radioactive waste. The test consists of a 90 m long, 5 m diameter subhorizontal tunnel excavated in dioritic granite. The monitoring aims to examine changes in the rock mass caused by an experimental repository environment, in particular due to thermal stresses induced from canister heating and pore pressures induced from tunnel sealing

  9. Test of the CLAS12 RICH large-scale prototype in the direct proximity focusing configuration

    Energy Technology Data Exchange (ETDEWEB)

    Anefalos Pereira, S.; Lucherini, V.; Mirazita, M.; Orlandi, A.; Orecchini, D.; Pisano, S.; Tomassini, S.; Viticchie, A. [Laboratori Nazionali di Frascati, INFN, Frascati (Italy); Baltzell, N.; El Alaoui, A.; Hafidi, K. [Physics Division, Argonne National Laboratory, Argonne, IL (United States); Barion, L.; Contalbrigo, M.; Malaguti, R.; Movsisyan, A.; Pappalardo, L.L.; Squerzanti, S. [INFN, Ferrara (Italy); Benmokhtar, F. [Department of Physics, Duquesne University, Pittsburgh, PA (United States); Brooks, W. [Universidad Tecnica Federico Santa Maria, Valparaiso (Chile); Cisbani, E. [Gruppo Sanita and Istituto Superiore di Sanita, INFN, Rome (Italy); Hoek, M.; Phillips, J. [School of Physics and Astronomy, Kelvin Building, University of Glasgow, Scotland (United Kingdom); Kubarovsky, V. [Thomas Jefferson National Accelerator Facility, Jefferson Laboratory, Newport News, VA (United States); Lagamba, L.; Perrino, R. [INFN, Bari (Italy); Montgomery, R.A. [Laboratori Nazionali di Frascati, INFN, Frascati (Italy); School of Physics and Astronomy, Kelvin Building, University of Glasgow, Scotland (United Kingdom); Musico, P. [INFN, Genova (Italy); Rossi, P. [Laboratori Nazionali di Frascati, INFN, Frascati (Italy); Thomas Jefferson National Accelerator Facility, Jefferson Laboratory, Newport News, VA (United States); Turisini, M. [INFN, Ferrara (Italy); Universidad Tecnica Federico Santa Maria, Valparaiso (Chile)

    2016-02-15

    A large-area ring-imaging Cherenkov detector has been designed to provide clean hadron identification capability in the momentum range from 3GeV/c up to 8GeV/c for the CLAS12 experiment at the upgraded 12GeV continuous electron beam accelerator facility of Jefferson Laboratory. The adopted solution foresees a novel hybrid optics design based on aerogel radiator, composite mirrors and highly packed and highly segmented photon detectors. Cherenkov light will either be imaged directly (forward tracks) or after two mirror reflections (large-angle tracks). We report here the results of the tests of a large-scale prototype of the RICH detector performed with the hadron beam of the CERN T9 experimental hall for the direct detection configuration. The tests demonstrated that the proposed design provides the required pion-to-kaon rejection factor of 1: 500 in the whole momentum range. (orig.)

  10. Some results of the 50 MW straight tube steam generator test in the TNO 50 MW SCTF at Hengelo

    International Nuclear Information System (INIS)

    Ludwig, P.W.P.H.; Hus, B.M.

    1975-01-01

    A prototype 50 MW straight tube steam generator has been tested during more than 3000 hours under operating conditions. The steady state, transient and stability behaviour were tested. The most remarkable results of the experiments are given. (author)

  11. Some results of the 50 MW straight tube steam generator test in the TNO 50 MW SCTF at Hengelo

    Energy Technology Data Exchange (ETDEWEB)

    Ludwig, P W.P.H.; Hus, B M

    1975-07-01

    A prototype 50 MW straight tube steam generator has been tested during more than 3000 hours under operating conditions. The steady state, transient and stability behaviour were tested. The most remarkable results of the experiments are given. (author)

  12. Active Combustion Control for Aircraft Gas-Turbine Engines-Experimental Results for an Advanced, Low-Emissions Combustor Prototype

    Science.gov (United States)

    DeLaat, John C.; Kopasakis, George; Saus, Joseph R.; Chang, Clarence T.; Wey, Changlie

    2012-01-01

    Lean combustion concepts for aircraft engine combustors are prone to combustion instabilities. Mitigation of instabilities is an enabling technology for these low-emissions combustors. NASA Glenn Research Center s prior activity has demonstrated active control to suppress a high-frequency combustion instability in a combustor rig designed to emulate an actual aircraft engine instability experience with a conventional, rich-front-end combustor. The current effort is developing further understanding of the problem specifically as applied to future lean-burning, very low-emissions combustors. A prototype advanced, low-emissions aircraft engine combustor with a combustion instability has been identified and previous work has characterized the dynamic behavior of that combustor prototype. The combustor exhibits thermoacoustic instabilities that are related to increasing fuel flow and that potentially prevent full-power operation. A simplified, non-linear oscillator model and a more physics-based sectored 1-D dynamic model have been developed to capture the combustor prototype s instability behavior. Utilizing these models, the NASA Adaptive Sliding Phasor Average Control (ASPAC) instability control method has been updated for the low-emissions combustor prototype. Active combustion instability suppression using the ASPAC control method has been demonstrated experimentally with this combustor prototype in a NASA combustion test cell operating at engine pressures, temperatures, and flows. A high-frequency fuel valve was utilized to perturb the combustor fuel flow. Successful instability suppression was shown using a dynamic pressure sensor in the combustor for controller feedback. Instability control was also shown with a pressure feedback sensor in the lower temperature region upstream of the combustor. It was also demonstrated that the controller can prevent the instability from occurring while combustor operation was transitioning from a stable, low-power condition to

  13. NIF Periscope Wall Modal Study Comparison of Results for 2 FEA Models with 2 Modal Tests

    International Nuclear Information System (INIS)

    Eli, M W; Gerhard, M A; Lee, C L; Sommer, S C; Woehrle, T G

    2000-01-01

    This report summarizes experimentally and numerically determined modal properties for one of the reinforced concrete end walls of the NIF Periscope Support Structure in Laser Bay 1. Two methods were used to determine these modal properties: (1) Computational finite-element analyses (modal extraction process); and (2) Experimental modal analysis based on measured test data. This report also includes experimentally determined modal properties for a prototype LM3/Polarizer line-replaceable unit (LRU) and a prototype PEPC LRU. Two important parameters, used during the design phase, are validated through testing [ref 1]. These parameters are the natural frequencies and modal damping (of the system in question) for the first several global modes of vibration. Experimental modal testing provides these modal values, along with the corresponding mode shapes. Another important parameter, the input excitation (expected during normal operation of the NIF laser system) [ref 1], can be verified by performing a series of ambient vibration measurements in the vicinity of the particular system (or subsystem) of interest. The topic of ambient input excitation will be covered in a separate report. Due to the large mass of the Periscope Pedestal, it is difficult to excite the entire series of Periscope Pedestal Walls all at once. It was decided that the experimental modal tests would be performed on just one Periscope End Wall in Laser Bay 1. Experimental modal properties for the Periscope End Wall have been used to validate and update the FE analyses. Results from the analyses and modal tests support the conclusion that the Periscope Pedestal will not exceed the stability budget, which is described in reference 1. The results of the modal tests for the Periscope End Wall in Laser Bay 1 have provided examples of modal properties that can be derived from future modal tests of the entire Periscope Assembly (excluding the LRU's). This next series of larger modal tests can be performed

  14. Usability testing of a prototype Phone Oximeter with healthcare providers in high- and low-medical resource environments.

    Science.gov (United States)

    Hudson, J; Nguku, S M; Sleiman, J; Karlen, W; Dumont, G A; Petersen, C L; Warriner, C B; Ansermino, J M

    2012-09-01

    To increase the use of pulse oximetry by capitalise on the wide availability of mobile phones, we have designed, developed and evaluated a prototype pulse oximeter interfaced to a mobile phone. Usability of this Phone Oximeter was tested as part of a rapid prototyping process. Phase 1 of the study (20 subjects) was performed in Canada. Users performed 23 tasks, while thinking aloud. Time for completion of tasks and analysis of user response to a mobile phone usability questionnaire were used to evaluate usability. Five interface improvements were made to the prototype before evaluation in Phase 2 (15 subjects) in Uganda. The lack of previous pulse oximetry experience and mobile phone use increased median (IQR [range]) time taken to perform tasks from 219 (160-247 [118-274]) s in Phase 1 to 228 (151-501 [111-2661]) s in Phase 2. User feedback was positive and overall usability high (Phase 1--82%, Phase 2--78%). Anaesthesia © 2012 The Association of Anaesthetists of Great Britain and Ireland.

  15. PCM-air heat exchangers for free-cooling applications in buildings: Experimental results of two real-scale prototypes

    International Nuclear Information System (INIS)

    Lazaro, Ana; Dolado, Pablo; Marin, Jose M.; Zalba, Belen

    2009-01-01

    Latent heat storage using phase change materials (PCM) can be used for free-cooling. In this application low air temperature is used to solidify the PCM during the night and then during the next day, the inside air of a building can be cooled down by exchanging heat with PCM. Short times for charging and discharging the PCM are required. PCM have in general low thermal conductivity, therefore the heat exchanger design is very important to fulfil free-cooling requirements. This paper presents an experimental setup for testing PCM-air real-scale heat exchangers and the results for two real-scale prototypes. Results show that a heat exchanger using a PCM with lower thermal conductivity and lower total stored energy, but adequately designed, has higher cooling power and can be applied for free-cooling

  16. Results from a prototype MAPS sensor telescope and readout system with zero suppression for the heavy flavor tracker at STAR

    International Nuclear Information System (INIS)

    Greiner, L.; Matis, H.S.; Ritter, H.G.; Rose, A.; Stezelberger, T.; Sun, X.; Szelezniak, M.; Thomas, J.; Vu, C.; Wieman, H.

    2008-01-01

    We describe a three Mimostar-2 Monolithic Active Pixel Sensor (MAPS) sensor telescope prototype with an accompanying readout system incorporating on-the-fly data sparsification. The system has been characterized and we report on the measured performance of the sensor telescope and readout system in beam tests conducted both at the Advanced Light Source (ALS) at Lawrence Berkeley National Laboratory (LBNL) and in the STAR experiment at the Relativistic Heavy Ion Collider (RHIC). This effort is part of the development and prototyping work that will lead to a vertex detector for the STAR experiment

  17. Prototype Generation Using Multiobjective Particle Swarm Optimization for Nearest Neighbor Classification.

    Science.gov (United States)

    Hu, Weiwei; Tan, Ying

    2016-12-01

    The nearest neighbor (NN) classifier suffers from high time complexity when classifying a test instance since the need of searching the whole training set. Prototype generation is a widely used approach to reduce the classification time, which generates a small set of prototypes to classify a test instance instead of using the whole training set. In this paper, particle swarm optimization is applied to prototype generation and two novel methods for improving the classification performance are presented: 1) a fitness function named error rank and 2) the multiobjective (MO) optimization strategy. Error rank is proposed to enhance the generation ability of the NN classifier, which takes the ranks of misclassified instances into consideration when designing the fitness function. The MO optimization strategy pursues the performance on multiple subsets of data simultaneously, in order to keep the classifier from overfitting the training set. Experimental results over 31 UCI data sets and 59 additional data sets show that the proposed algorithm outperforms nearly 30 existing prototype generation algorithms.

  18. Development and Assessment of Planetary Gear Unit for Experimental Prototype of Vertical Axis Wind Turbine

    Directory of Open Access Journals (Sweden)

    Urbahs A.

    2017-10-01

    Full Text Available The theoretical calculation for development of planetary gear unit of wind turbine (WT and its experimental tests are presented in the paper. Development of experimental prototypes from composite materials is essential to determine capability of element and its impact on feature. Two experimental scale prototypes of planetary gear unit for WT were developed for such purposes. Hall transducer, servomechanisms and optical tachometers were used to obtain results, comparison analysis of theoretical and actual data was performed as well as quality assessment of experimental prototypes of planetary gear unit. After kinematic and load analysis as well as control of rotation frequency, it is possible to declare that the unit is able to operate at designated quality. Theoretical calculations and test results obtained are used for industrial WT prototype development.

  19. Development and Assessment of Planetary Gear Unit for Experimental Prototype of Vertical Axis Wind Turbine

    Science.gov (United States)

    Urbahs, A.; Urbaha, M.; Carjova, K.

    2017-10-01

    The theoretical calculation for development of planetary gear unit of wind turbine (WT) and its experimental tests are presented in the paper. Development of experimental prototypes from composite materials is essential to determine capability of element and its impact on feature. Two experimental scale prototypes of planetary gear unit for WT were developed for such purposes. Hall transducer, servomechanisms and optical tachometers were used to obtain results, comparison analysis of theoretical and actual data was performed as well as quality assessment of experimental prototypes of planetary gear unit. After kinematic and load analysis as well as control of rotation frequency, it is possible to declare that the unit is able to operate at designated quality. Theoretical calculations and test results obtained are used for industrial WT prototype development.

  20. Design of Smart Home Systems Prototype Using MyRIO

    Science.gov (United States)

    Ratna Wati, Dwi Ann; Abadianto, Dika

    2017-06-01

    This paper presents the design of smart home systems prototype. It applies. MyRIO 1900 embedded device as the main controller of the smart home systems. The systems include wireless monitoring systems and email based notifications as well as data logging. The prototype systems use simulated sensor such as temperature sensor, push button as proximity sensor, and keypad while its simulated actuators are buzzer as alarm system, LED as light and LCD. Based on the test and analysis, the smart home systems prototype as well as the wireless monitoring systems have real time responses when input signals are available. Tbe performance of MyRIO controller is excellent and it results in a stable system.

  1. The effect of encoding conditions on learning in the prototype distortion task.

    Science.gov (United States)

    Lee, Jessica C; Livesey, Evan J

    2017-06-01

    The prototype distortion task demonstrates that it is possible to learn about a category of physically similar stimuli through mere observation. However, there have been few attempts to test whether different encoding conditions affect learning in this task. This study compared prototypicality gradients produced under incidental learning conditions in which participants performed a visual search task, with those produced under intentional learning conditions in which participants were required to memorize the stimuli. Experiment 1 showed that similar prototypicality gradients could be obtained for category endorsement and familiarity ratings, but also found (weaker) prototypicality gradients in the absence of exposure. In Experiments 2 and 3, memorization was found to strengthen prototypicality gradients in familiarity ratings in comparison to visual search, but there were no group differences in participants' ability to discriminate between novel and presented exemplars. Although the Search groups in Experiments 2 and 3 produced prototypicality gradients, they were no different in magnitude to those produced in the absence of stimulus exposure in Experiment 1, suggesting that incidental learning during visual search was not conducive to producing prototypicality gradients. This study suggests that learning in the prototype distortion task is not implicit in the sense of resulting automatically from exposure, is affected by the nature of encoding, and should be considered in light of potential learning-at-test effects.

  2. High confidence in falsely recognizing prototypical faces.

    Science.gov (United States)

    Sampaio, Cristina; Reinke, Victoria; Mathews, Jeffrey; Swart, Alexandra; Wallinger, Stephen

    2018-06-01

    We applied a metacognitive approach to investigate confidence in recognition of prototypical faces. Participants were presented with sets of faces constructed digitally as deviations from prototype/base faces. Participants were then tested with a simple recognition task (Experiment 1) or a multiple-choice task (Experiment 2) for old and new items plus new prototypes, and they showed a high rate of confident false alarms to the prototypes. Confidence and accuracy relationship in this face recognition paradigm was found to be positive for standard items but negative for the prototypes; thus, it was contingent on the nature of the items used. The data have implications for lineups that employ match-to-suspect strategies.

  3. Architectures of prototypes and architectural prototyping

    DEFF Research Database (Denmark)

    Hansen, Klaus Marius; Christensen, Michael; Sandvad, Elmer

    1998-01-01

    together as a team, but developed a prototype that more than fulfilled the expectations of the shipping company. The prototype should: - complete the first major phase within 10 weeks, - be highly vertical illustrating future work practice, - continuously live up to new requirements from prototyping......This paper reports from experience obtained through development of a prototype of a global customer service system in a project involving a large shipping company and a university research group. The research group had no previous knowledge of the complex business of shipping and had never worked...... sessions with users, - evolve over a long period of time to contain more functionality - allow for 6-7 developers working intensively in parallel. Explicit focus on the software architecture and letting the architecture evolve with the prototype played a major role in resolving these conflicting...

  4. Collaborative Prototyping

    DEFF Research Database (Denmark)

    Bogers, Marcel; Horst, Willem

    2014-01-01

    of the prototyping process, the actual prototype was used as a tool for communication or development, thus serving as a platform for the cross-fertilization of knowledge. In this way, collaborative prototyping leads to a better balance between functionality and usability; it translates usability problems into design......This paper presents an inductive study that shows how collaborative prototyping across functional, hierarchical, and organizational boundaries can improve the overall prototyping process. Our combined action research and case study approach provides new insights into how collaborative prototyping...... can provide a platform for prototype-driven problem solving in early new product development (NPD). Our findings have important implications for how to facilitate multistakeholder collaboration in prototyping and problem solving, and more generally for how to organize collaborative and open innovation...

  5. Integration tests of prototype LVL1 calorimeter trigger CP/JEP ROD and LVL2 trigger Region-of-Interest Builder. Also visible in the photo are two further racks containing the demonstrator prototypes of the LVL1 CTP and the MUCTPI.

    CERN Multimedia

    Gee, N

    2001-01-01

    Integration tests of prototype LVL1 calorimeter trigger CP/JEP ROD and LVL2 trigger Region-of-Interest Builder. Also visible in the photo are two further racks containing the demonstrator prototypes of the LVL1 CTP and the MUCTPI.

  6. Deep Space CubeSat Prototype Platform Design and Testing

    Data.gov (United States)

    National Aeronautics and Space Administration — This IRAD will significantly advance a GSFC Deep Space CubeSat prototype effort in almost all subsystems.  Because it represents a “tall pole” for lunar orbiters, as...

  7. ABOUT MODERN TECHNICAL GRAPHICS USING IN THE VIRTUAL PROTOTYPING

    OpenAIRE

    GHERGHINA George; POPA Dragos; BOGDAN Mihaela; GLUGA Cristian

    2008-01-01

    The paper presents aspects concerning the using of modern technical graphics elements in the virtual prototyping. The virtual prototyping is a process which uses a virtual prototype in place of physical prototype for the testing and the evaluation of specific features of designed product. The virtual prototype is created by computer such as it could assign the specific features as close as possible to the real conditions which permit its function simulation in the conditions for which is desi...

  8. Prototyping the PANDA Barrel DIRC

    Energy Technology Data Exchange (ETDEWEB)

    Schwarz, C., E-mail: C.Schwarz@gsi.de [GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt (Germany); Kalicy, G.; Dzhygadlo, R.; Gerhardt, A.; Götzen, K.; Hohler, R.; Kumawat, H.; Lehmann, D.; Lewandowski, B.; Patsyuk, M.; Peters, K.; Schepers, G.; Schmitt, L.; Schwiening, J.; Traxler, M.; Zühlsdorf, M. [GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt (Germany); Dodokhov, V.Kh. [Joint Institute for Nuclear Research, Dubna (Russian Federation); Britting, A.; Eyrich, W.; Lehmann, A. [Friedrich Alexander-University of Erlangen-Nuremberg, Erlangen (Germany); and others

    2014-12-01

    The design of the Barrel DIRC detector for the future PANDA experiment at FAIR contains several important improvements compared to the successful BABAR DIRC, such as focusing and fast timing. To test those improvements as well as other design options a prototype was build and successfully tested in 2012 with particle beams at CERN. The prototype comprises a radiator bar, focusing lens, mirror, and a prism shaped expansion volume made of synthetic fused silica. An array of micro-channel plate photomultiplier tubes measures the location and arrival time of the Cherenkov photons with sub-nanosecond resolution. The development of a fast reconstruction algorithm allowed to tune construction details of the detector setup with test beam data and Monte-Carlo simulations.

  9. Manufacturing and testing of full scale prototype for ITER blanket shield block

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sa-Woong, E-mail: swkim12@nfri.re.kr [ITER Korea, National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Duck-Hoi; Jung, Hun-Chea [ITER Korea, National Fusion Research Institute, Daejeon (Korea, Republic of); Lee, Sung-Ki [WONIL Co., Ltd., Haman (Korea, Republic of); Kang, Sung-Chan [POSCO Specialty Steel Co., Ltd., Changwon (Korea, Republic of); Zhang, Fu; Kim, Byoung-Yoon [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Ahn, Hee-Jae; Lee, Hyeon-Gon; Jung, Ki-Jung [ITER Korea, National Fusion Research Institute, Daejeon (Korea, Republic of)

    2015-04-15

    Highlights: • 316L(N)-IG forged steel was successfully fabricated and qualified. • Related R&D activities were implemented to resolve the fabrication issues. • SB #8 FSP was successfully manufactured with conventional fabrication techniques. • All of the validation tests were carried out and met the acceptance criteria. - Abstract: Based on the preliminary design of the ITER blanket shield block (SB) #8, the full scale prototype (FSP) has been manufactured and tested in accordance with pre-qualification program, and related R&D was performed to resolve the technical issues of fabrication. The objective of the SB pre-qualification program is to demonstrate the acceptable manufacturing quality by successfully passing the formal test program. 316L(N)-IG stainless steel forging blocks with 1.80L × 1.12W × 0.43t (m) were developed by using an electric arc furnace, and as a result, the material properties were satisfied with technical specification. In the course of applying conventional fabrication techniques such as cutting, milling, drilling and welding of the forged stainless steel block for the manufacturing of the SB #8 FSP, several technical problems have been addressed. And also, the hydraulic connector of cross-forged material re-melted by electro slag or vacuum arc requires the application of advanced joining techniques such as automatic bore TIG and friction welding. Many technical issues – drilling, welding, slitting, non-destructive test and so on – have been raised during manufacturing. Associated R&D including the computational simulation and coupon testing has been done in collaboration with relevant industries in order to resolve these engineering issues. This paper provides technical key issues and their possible resolutions addressed during the manufacture and formal test of the SB #8 FSP, and related R&D.

  10. Prototype of an excimer laser for microprocessing

    Science.gov (United States)

    Iwanejko, Leszek; Pokora, Ludwik J.; Wolinski, Wieslaw L.

    1991-08-01

    The paper presents a brief description of a prototype of a XeC1 excimer laser for micraprocessing of materials. The planned main parameters of the laserare as follows: wavelength . . . . . . . . . . . . . . . . . . . . . . . . . 308 nm -''energyofapulse. . . . . . . . . . . . . lOOmJ -pulseduration (FWHM) . . . . . . . . . . . . . . . 2Ons repetition frequency . . . . . . . . . . . . . . 1O Hz peak power of a pulse . . . . . . . . . . . . . . . 5 MW With respect to currently carrried works with the prototype we show only preliminary results of testing of a laser head. The obtained maximum laser pulse energy exceeded 90 ml. However it should be pointed out that this value was obtained without any opt i mi z at i on of the 1 aser.

  11. Performance investigation of a lab–scale latent heat storage prototype – Numerical results

    International Nuclear Information System (INIS)

    Niyas, Hakeem; Prasad, Sunku; Muthukumar, P.

    2017-01-01

    Highlights: • Developed a numerical tool for analyzing a shell-and-tube LHS system. • Effective heat capacity method is used for incorporating the latent heat. • Number of heat transfer fluid tubes and fins are optimized. • Partial charging/discharging is efficient than complete charging/discharging. • Numerically predicted values match well with the experimental results. - Abstract: In the current study, numerical analysis of the charging and discharging characteristics of a lab-scale latent heat storage (LHS) prototype is presented. A mathematical model is developed to analyze the performance characteristics of the LHS prototype of shell and tube heat exchanger configuration. Effective heat capacity (EHC) method is implemented to consider the latent heat of the phase change material (PCM) and Boussinesq approximation is used to incorporate the buoyancy effect of the molten layer of the PCM in the model. For proper modeling of velocities in the PCM, Darcy law’s source term is added. The governing equations involved in the model are solved using a finite element based software product, COMSOL Multiphysics 4.3a. The number of embedded tubes and fins on the embedded tubes are optimized based on the discharging time of the model. Various performance parameters such as charging/discharging time, energy storage/discharge rate and melt fraction are evaluated. Numerically predicted temperature variations of the model during charging and discharging processes were compared with the experimental data extracted from the lab-scale LHS prototype and a good agreement was found between them.

  12. Rethink! prototyping transdisciplinary concepts of prototyping

    CERN Document Server

    Nagy, Emilia; Stark, Rainer

    2016-01-01

    In this book, the authors describe the findings derived from interaction and cooperation between scientific actors employing diverse practices. They reflect on distinct prototyping concepts and examine the transformation of development culture in their fusion to hybrid approaches and solutions. The products of tomorrow are going to be multifunctional, interactive systems – and already are to some degree today. Collaboration across multiple disciplines is the only way to grasp their complexity in design concepts. This underscores the importance of reconsidering the prototyping process for the development of these systems, particularly in transdisciplinary research teams. “Rethinking Prototyping – new hybrid concepts for prototyping” was a transdisciplinary project that took up this challenge. The aim of this programmatic rethinking was to come up with a general concept of prototyping by combining innovative prototyping concepts, which had been researched and developed in three sub-projects: “Hybrid P...

  13. Prototype tests for the liquid Krypton, Calorimeter of the CP-violation Experiment NA48

    CERN Document Server

    Viehauser, Georg

    This work 1s the result of a one year stay as a technical student in the NA48 group at the European Center for Nuclear Research CERN from May 1992 to May 1993. The NA48 experiment is a fixed target experiment at the CERN Super Proton Synchrotron (SPS) to study direct CP violation in neutral kaon decays. The aim of the experiment is the measurement of the ratio of the CP violation parameters £ '/£. Chapter 1 will explain the origin of these parameters and our current knowledge of their size. Chapter 2 will give a description of the NA48 experiment. A crucial part of the experiment will be a photon calorimeter filled with liquid krypton. It has to meet very ambitious demands concerning the high rate capability and the energy, space and time resolutions. In chapter 3 the principles of electromagnetic calorimetry and ionization chambers are reviewed. In 1992 two test beam exposures of a prototype of the liquid krypton calorimeter were performed. A description of these tests will be given in chapter 4. During th...

  14. A prototype ionization profile monitor for RHIC

    International Nuclear Information System (INIS)

    Connolly, R.; Cameron, P.; Ryan, W.

    1997-01-01

    Transverse beam profiles in the Relativistic Heavy-Ion Collider (RHIC) will be measured with ionization profile monitors (IPM's). Each IPM collects and measures the distribution of electrons in the beamline resulting from residual gas ionization during bunch passage. The electrons are swept transversely from the beamline and collected on strip anodes oriented parallel to the beam axis. At each bunch passage the charge pulses are amplified, integrated, and digitized for display as a profile histogram. A prototype detector was tested in the injection line during the RHIC Sextant Test. This paper describes the detector and gives results from the beam tests

  15. A prototype ionization profile monitor for RHIC

    Energy Technology Data Exchange (ETDEWEB)

    Connolly, R.; Cameron, P.; Ryan, W. [and others

    1997-07-01

    Transverse beam profiles in the Relativistic Heavy-Ion Collider (RHIC) will be measured with ionization profile monitors (IPM`s). Each IPM collects and measures the distribution of electrons in the beamline resulting from residual gas ionization during bunch passage. The electrons are swept transversely from the beamline and collected on strip anodes oriented parallel to the beam axis. At each bunch passage the charge pulses are amplified, integrated, and digitized for display as a profile histogram. A prototype detector was tested in the injection line during the RHIC Sextant Test. This paper describes the detector and gives results from the beam tests.

  16. EUSO-TA prototype telescope

    Energy Technology Data Exchange (ETDEWEB)

    Bisconti, Francesca, E-mail: francesca.bisconti@kit.edu

    2016-07-11

    EUSO-TA is one of the prototypes developed for the JEM-EUSO project, a space-based large field-of-view telescope to observe the fluorescence light emitted by cosmic ray air showers in the atmosphere. EUSO-TA is a ground-based prototype located at the Telescope Array (TA) site in Utah, USA, where an Electron Light Source and a Central Laser Facility are installed. The purpose of the EUSO-TA project is to calibrate the prototype with the TA fluorescence detector in presence of well-known light sources and cosmic ray air showers. In 2015, the detector started the first measurements and tests using the mentioned light sources have been performed successfully. A first cosmic ray candidate has been observed, as well as stars of different magnitude and color index. Since Silicon Photo-Multipliers (SiPMs) are very promising for fluorescence telescopes of next generation, they are under consideration for the realization of a new prototype of EUSO Photo Detector Module (PDM). The response of this sensor type is under investigation through simulations and laboratory experimentation.

  17. EUSO-TA prototype telescope

    Science.gov (United States)

    Bisconti, Francesca; JEM-EUSO Collaboration

    2016-07-01

    EUSO-TA is one of the prototypes developed for the JEM-EUSO project, a space-based large field-of-view telescope to observe the fluorescence light emitted by cosmic ray air showers in the atmosphere. EUSO-TA is a ground-based prototype located at the Telescope Array (TA) site in Utah, USA, where an Electron Light Source and a Central Laser Facility are installed. The purpose of the EUSO-TA project is to calibrate the prototype with the TA fluorescence detector in presence of well-known light sources and cosmic ray air showers. In 2015, the detector started the first measurements and tests using the mentioned light sources have been performed successfully. A first cosmic ray candidate has been observed, as well as stars of different magnitude and color index. Since Silicon Photo-Multipliers (SiPMs) are very promising for fluorescence telescopes of next generation, they are under consideration for the realization of a new prototype of EUSO Photo Detector Module (PDM). The response of this sensor type is under investigation through simulations and laboratory experimentation.

  18. Design, fabrication, test, and evaluation of a prototype 150-foot long composite wind turbine blade

    Science.gov (United States)

    Gewehr, H. W.

    1979-01-01

    The design, fabrication, testing, and evaluation of a prototype 150 foot long composite wind turbine blade is described. The design approach and material selection, compatible with low cost fabrication methods and objectives, are highlighted. The operating characteristics of the blade during rotating and nonrotating conditions are presented. The tensile, compression, and shear properties of the blade are reported. The blade fabrication, tooling, and quality assurance are discussed.

  19. Performance of a Micro-UAV lifting system built with the usage of rapid prototyping methods

    International Nuclear Information System (INIS)

    Dalewski, R T; Gumowski, K; Barczak, T; Godek, J

    2014-01-01

    This article presents results of the aerodynamic testing of a micro unmanned aerial vehicle rotor efficiency. The rotors were prepared as a set of two rotors in a counter-rotating ducted drive. Prototypes of the drives were made using two rapid prototyping techniques – FDM – fused deposition modelling method and SLS – selective laser sintering. Rotors were made then treated by introducing additional finishing cyanoacrylate coating and abrasive processing. Main differences between those models were observed in fan shape, porosity, surface roughness and mechanical properties – stiffness. An influence of these factors was observed on an aerodynamic efficiency. For the obtained prototypes both simulations and experimental testing were conducted with thrust, power, torque measurements, as well as the measurement of velocity and pressure distribution at the outlet of the duct. The results show the possibility of using rapid prototyping techniques to produce prototypes of drives operating in the low and medium Reynolds numbers (6000-60000), and the aerodynamic shape relevant factors affecting the preparation and performance of such drives. In addition, simulation studies were performed using the Fluent environment where experimental results were confronted with the results of simulation studies.

  20. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  1. Engineering, design and prototype tests of a 3.9 GHz transverse-mode superconducting cavity for a radiofrequency-separated kaon beam

    International Nuclear Information System (INIS)

    Mark S. Champion et al.

    2001-01-01

    A research and development program is underway to construct superconducting cavities to be used for radiofrequency separation of a Kaon beam at Fermilab. The design calls for installation of twelve 13-cell cavities operating in the 3.9 GHz transverse mode with a deflection gradient of 5 MV/m. They present the mechanical, cryogenic and vacuum design of the cavity, cryomodule, rf power coupler, cold tuner and supporting hardware. The electromagnetic design of the cavity is presented in a companion paper by Wanzenberg and McAshan. The warm tuning system (for field flatness) and the vertical test system is presented along with test results of bench measurements and cold tests on single-cell and five-cell prototypes

  2. Sensitivity and Specificity of a Prototype Rapid Diagnostic Test for the Detection of Trypanosoma brucei gambiense Infection: A Multi-centric Prospective Study.

    Science.gov (United States)

    Bisser, Sylvie; Lumbala, Crispin; Nguertoum, Etienne; Kande, Victor; Flevaud, Laurence; Vatunga, Gedeao; Boelaert, Marleen; Büscher, Philippe; Josenando, Theophile; Bessell, Paul R; Biéler, Sylvain; Ndung'u, Joseph M

    2016-04-01

    A major challenge in the control of human African trypanosomiasis (HAT) is lack of reliable diagnostic tests that are rapid and easy to use in remote areas where the disease occurs. In Trypanosoma brucei gambiense HAT, the Card Agglutination Test for Trypanosomiasis (CATT) has been the reference screening test since 1978, usually on whole blood, but also in a 1/8 dilution (CATT 1/8) to enhance specificity. However, the CATT is not available in a single format, requires a cold chain for storage, and uses equipment that requires electricity. A solution to these challenges has been provided by rapid diagnostic tests (RDT), which have recently become available. A prototype immunochromatographic test, the SD BIOLINE HAT, based on two native trypanosomal antigens (VSG LiTat 1.3 and VSG LiTat 1.5) has been developed. We carried out a non-inferiority study comparing this prototype to the CATT 1/8 in field settings. The prototype SD BIOLINE HAT, the CATT Whole Blood and CATT 1/8 were systematically applied on fresh blood samples obtained from 14,818 subjects, who were prospectively enrolled through active and passive screening in clinical studies in three endemic countries of central Africa: Angola, the Democratic Republic of the Congo and the Central African Republic. One hundred and forty nine HAT cases were confirmed by parasitology. The sensitivity and specificity of the prototype SD BIOLINE HAT was 89.26% (95% confidence interval (CI) = 83.27-93.28) and 94.58% (95% CI = 94.20-94.94) respectively. The sensitivity and specificity of the CATT on whole blood were 93.96% (95% CI = 88.92-96.79) and 95.91% (95% CI = 95.58-96.22), and of the CATT 1/8 were 89.26% (95% CI = 83.27-93.28) and 98.88% (95% CI = 98.70-99.04) respectively. After further optimization, the prototype SD BIOLINE HAT could become an alternative to current screening methods in primary healthcare settings in remote, resource-limited regions where HAT typically occurs.

  3. Studies on the prototype of the transition-radiation detector for the Zeus experiment

    International Nuclear Information System (INIS)

    Munde, A.

    1991-04-01

    The Zeus detector is currently being built for HERA at Hamburg. One part of the inner detector is the transition radiation detector (TRD). It will identify single electrons inside hadronic jets of deep inelastic ep-collisions. To test the chamber performance and to improve mechanical tools, a prototype of the smallest detector modul (TRD-1) was built. The gasgain of this prototype was measured under several high voltage conditions. The gasgain is about 1.5x10 3 up to 8x10 3 in Argon/Methane 90/10. To test the function of this prototype, the test beam facility at the Bonn 2.5 GeV electron synchrotron was used. The same relative amplification was measured by comparing the beam results with those obtained with a Fe 55 -source. (orig.) [de

  4. Design of the ILC Prototype FONT4 Digital Intra-Train Beam-Based Feedback System

    International Nuclear Information System (INIS)

    Burrows, P.; Queen Mary, U. of London; Christian, G.B.; Hartin, A.F.; Dabiri Khah, H.; White, G.R.; Oxford U.; Clarke, C.C.; Perry, C.; Oxford Instruments; Kalinin, A.; Daresbury; McCormick, D.J.; Molloy, S.; Ross, M.C.; SLAC

    2007-01-01

    We present the design of the FONT4 digital intra-train beam position feedback system prototype and preliminary results of initial beam tests at the Accelerator Test Facility (ATF) at KEK. The feedback system incorporates a fast analogue beam position monitor (BPM) front-end signal processor, a digital feedback board, and a kicker driver amplifier. The short bunchtrain, comprising 3 electron bunches separated by c. 150ns, in the ATF extraction line was used to test components of the prototype feedback system

  5. Design, construction, prototype tests and performance of a vertex chamber for the MAC detector

    International Nuclear Information System (INIS)

    Ash, W.W.; Band, H.R.; Bloom, E.D.; Bosman, M.; Camporesi, T.; Chadwick, G.B.; Delfino, M.C.; De Sangro, R.; Ford, W.T.; Gettner, M.W.; Goderre, G.P.; Godfrey, G.L.; Groom, D.E.; Hurst, R.B.; Johnson, J.R.; Lau, K.H.; Lavine, T.L.; Leedy, R.E.; Lippi, I.; Maruyama, T.; Messner, R.L.; Moromisato, J.H.; Moss, L.J.; Muller, F.; Nelson, H.N.; Peruzzi, I.; Piccolo, M.; Prepost, R.; Pyrlik, J.; Qi, N.; Read, A.L. Jr.; Ritson, D.M.; Rosenberg, L.J.; Shambroom, W.D.; Sleeman, J.C.; Smith, J.G.; Venuti, J.P.; Verdini, P.G.; Goeler, E. von; Wald, H.B.; Weinstein, R.; Wiser, D.E.; Zdarko, R.W.; Istituto Nazionale di Fisica Nucleare, Frascati; Houston Univ., TX; Northeastern Univ., Boston, MA; Stanford Univ., CA; Stanford Linear Accelerator Center, CA; Utah Univ., Salt Lake City; Wisconsin Univ., Madison

    1987-01-01

    The design considerations, construction techniques, prototype tests and performance characteristics of a pressurized drift chamber used in the MAC detector at PEP are described. The chamber consists of 324 aluminized mylar tubes of 6.9 mm diameter with wall thickness of 100 μm. With appropriate shielding it operates successfully at 4.6 cm from the beam line. It was simple to construct and was configured to permit any malfunctioning tubes to be remotely disconnected without affecting operation. The chamber operated without problems for two years in the PEP environmental with a gas mixture of 49.5% argon, 49.5% CO 2 , 1% CH 4 , at 4 atm absolute pressure. The mean spatial resolution averaged over all tubes was 45 μm. The time to distance relation for this gas mixture, along with the geometric positioning of individual wires relative to the central tracking chamber, was obtained with data from Bhabha scattering events. We also describe resolution studies performed with a prototype chamber in a SLAC test beam. A wide range of gases, gas pressures, and electronic parameters were explored. These studies proved that resolutions in the 10-50 μm range were possible. Our experience demonstrates that chambers of this type provide high precision tracking and are particularly suited for operation in regions with difficult physical access and/or high ambient radiation levels. (orig.)

  6. Design, construction, prototype tests and performance of a vertex chamber for the MAC detector

    Science.gov (United States)

    Ash, W. W.; Band, H. R.; Bloom, E. D.; Bosman, M.; Camporesi, T.; Chadwick, G. B.; Delfino, M. C.; De Sangro, R.; Ford, W. T.; Gettner, M. W.; Goderre, G. P.; Godfrey, G. L.; Groom, D. E.; Hurst, R. B.; Johnson, J. R.; Lau, K. H.; Lavine, T. L.; Leedy, R. E.; Lippi, I.; Maruyama, T.; Messner, R. L.; Moromisato, J. H.; Moss, L. J.; Muller, F.; Nelson, H. N.; Peruzzi, I.; Piccolo, M.; Prepost, R.; Pyrlik, J.; Qi, N.; Read, A. L.; Ritson, D. M.; Rosenberg, L. J.; Shambroom, W. D.; Sleeman, J. C.; Smith, J. G.; Venuti, J. P.; Verdini, P. G.; Von Goeler, E.; Wald, H. B.; Weinstein, R.; Wiser, D. E.; Zdarko, R. W.

    1987-11-01

    The design considerations, construction techniques, prototype tests and performance characteristics of a pressurized drift chamber used in the MAC detector at PEP are described. The chamber consists of 324 aluminized mylar tubes of 6.9 mm diameter with wall thickness of 100 μm. With appropriate shielding it operates successfully at 4.6 cm from the beam line. It was simple to construct and was configured to permit any malfunctioning tubes to be remotely disconnected without affecting operation. The chamber operated without problems for two years in the PEP environment with a gas mixture of 49.5% argon, 49.5% CO 2, 1% CH 4, at 4 atm absolute pressure. The mean spatial resolution averaged over all tubes was 45 μm. The time to distance relation for this gas mixture, along with the geometric positioning of individual wires relative to the central tracking chamber, was obtained with data from Bhabha scattering events. We also describe resolution studies performed with a prototype chamber in a SLAC test beam. A wide range of gases, gas pressures, and electronic parameters were explored. These studies proved that resolutions in the 10-50 μm range were possible. Our experience demonstrates that chambers of this type provide high precision tracking and are particularly suited for operation in regions with difficult physical access and/or high ambient radiation levels.

  7. PERFORMANCE EVALUATION OF A PROTOTYPE ARCHITECT ANTIBODY ASSAY FOR BABESIA MICROTI.

    Science.gov (United States)

    Cheng, Kevin; Coller, Kelly E; Marohnic, Christopher C; Pfeiffer, Zachary A; Fino, James R; Elsing, Randee R; Bergsma, Janet; Marcinkus, Marilee A; Kar, Alak K; Gumbs, Orlando H; Otis, Kathy S; Fishpaugh, Jeffrey; Schultz, Phillip W; Pope, Mark R; Narvaez, Alfredo R; Wong, Susan J; Madison-Antenucci, Susan; Leary, Thomas P; Dawson, George J

    2018-05-09

    The tick-borne protozoan Babesia microti is responsible for more than 200 cases of transfusion-transmitted babesiosis (TTB) infection in the United States over the last 30 years. Measures to mitigate the risk of TTB include nucleic acid testing (NAT) and B. microti antibody testing. A fully automated prototype B. microti antibody test was developed on the ARCHITECT instrument. The specificity was determined to be 99.98% in volunteer blood donors (n=28,740) from areas considered as low endemic for B. microti The sensitivity of the prototype test was studied in experimentally-infected macaques; a total of 128 samples were detected compared to 125 with the indirect fluorescent antibody test (IFA), additionally, 83 (89.2%) of the PCR positive samples were detected compared to 81 (87.1%) using the IFA test. All PCR positive samples that tested negative in the prototype antibody test were pre-seroconversion period samples. Following seroconversion, periods of intermittent parasitemia occurred; 17 PCR negative samples drawn in-between PCR positive bleed dates, tested positive both by the prototype test (robust reactivity) and IFA (marginal reactivity) prior to the administration of therapeutic drugs, indicating that the PCR test failed to detect samples from persistently infected macaques. The prototype assay detected 56 of 58 (96.6%) human subjects diagnosed with clinical babesiosis by both PCR and IFA testing. Overall, the prototype anti-babesia assay provides a highly sensitive and specific test for the diagnosis of B. microti infection. While PCR is preferred for detection of window period parasitemia, antibody tests detect infected subjects during periods of low level parasitemia. Copyright © 2018 Cheng et al.

  8. Fabrication of ATLAS pixel detector prototypes at IRST

    International Nuclear Information System (INIS)

    Boscardin, M.; Betta, G.-F. Dalla; Gregori, P.; Zen, M.; Zorzi, N.

    2001-01-01

    We report on the development of a fabrication technology for n-on-n silicon pixel detectors oriented to the ATLAS experiment at LHC. The main processing issues and some selected results from the electrical characterization of detector prototypes and related test structures are presented and discussed

  9. Evaluation of prototype electrofibrous filters for nuclear ventilation ducts

    International Nuclear Information System (INIS)

    Bergman, W.; Kuhl, W.D.; Biermann, A.H.; Johnson, J.S.; Lum, B.Y.

    1983-01-01

    Two prototype electrofibrous filters were designed, built and evaluated in laboratory tests and in field installations. These prototypes were designed for use in nuclear ventilation ducts as prefilters to HEPA filters. One prototype is designed to be a permanent component of the ventilation system while the other is a disposable unit. The disposable electrofibrous prefilter was installed in the exhaust stream of a glove box in which barrels of uranium turnings are burned. Preliminary tests show the disposable prefilter is effectively prolonging the HEPA filter life

  10. Evaluation of prototype electrofibrous filters for nuclear-ventilation ducts

    International Nuclear Information System (INIS)

    Bergman, W.; Kuhl, W.D.; Biermann, A.H.; Johnson, J.S.; Lum, B.Y.

    1982-01-01

    Two prototypes electrofibrous filters were designed, built and evaluated in laboratory tests and in field installations. These prototypes were designed for use in nuclear ventilation ducts as prefilters to HEPA filters. One prototype is designed to be a permanent component of the ventilation system while the other is a disposable unit. The disposable electrofibrous prefilter was installed in the exhaust stream of a glove box in which barrels of uranium turnings are burned. Preliminary tests show the disposable prefilter is effectively prolonging the HEPA filter life

  11. Flight Test Results for the F-16XL With a Digital Flight Control System

    Science.gov (United States)

    Stachowiak, Susan J.; Bosworth, John T.

    2004-01-01

    In the early 1980s, two F-16 airplanes were modified to extend the fuselage length and incorporate a large area delta wing planform. These two airplanes, designated the F-16XL, were designed by the General Dynamics Corporation (now Lockheed Martin Tactical Aircraft Systems) (Fort Worth, Texas) and were prototypes for a derivative fighter evaluation program conducted by the United States Air Force. Although the concept was never put into production, the F-16XL prototypes provided a unique planform for testing concepts in support of future high-speed supersonic transport aircraft. To extend the capabilities of this testbed vehicle the F-16XL ship 1 aircraft was upgraded with a digital flight control system. The added flexibility of a digital flight control system increases the versatility of this airplane as a testbed for aerodynamic research and investigation of advanced technologies. This report presents the handling qualities flight test results covering the envelope expansion of the F-16XL with the digital flight control system.

  12. CCSDS SM and C Mission Operations Interoperability Prototype

    Science.gov (United States)

    Lucord, Steven A.

    2010-01-01

    This slide presentation reviews the prototype of the Spacecraft Monitor and Control (SM&C) Operations for interoperability among other space agencies. This particular prototype uses the German Space Agency (DLR) to test the ideas for interagency coordination.

  13. Design, fabrication and low power RF testing of a prototype beta=1, 1050 MHz cavity developed for electron linac

    International Nuclear Information System (INIS)

    Sarkar, S.; Mondal, J.; Mittal, K.C.

    2013-01-01

    A single cell 1050 MHz β = 1 elliptical cavity has been designed for possible use in High energy electron accelerator. A prototype Aluminium cavity has been fabricated by die punch method and low power testing of the cavity has been carried out by using VNA. The fundamental mode frequency of the prototype cavity is found out to be 1051.38 MHz and Q (loaded) and Q0 values corresponding to 2 modes are 8439 and 10013 respectively. Cell to cell coupling coefficient is 1.82 % from measurement which matches with the designed value (1.84%). The higher order mode frequencies are also measured and electric field of the cavity is confirmed by bead pull method. Low power RF measurements on the prototype cavity indicate that the critical RF parameters (Qo, f, Kc etc) for the cavity are consistent with the designed value. (author)

  14. Semiportable load-cell-based weighing system prototype of 18.14-metric-ton (20-ton) capacity for UF6 cylinder weight verifications: description and testing procedure

    International Nuclear Information System (INIS)

    McAuley, W.A.

    1984-01-01

    The 18.14-metric-ton-capacity (20-ton) Load-Cell-Based Weighing System (LCBWS) prototype tested at the Oak Ridge (Tennessee) Gaseous Diffusion Plant March 20-30, 1984, is semiportable and has the potential for being highly accurate. Designed by Brookhaven National Laboratory, it can be moved to cylinders for weighing as opposed to the widely used operating philosophy of most enrichment facilities of moving cylinders to stationary accountability scales. Composed mainly of commercially available, off-the-shelf hardware, the system's principal elements are two load cells that sense the weight (i.e., force) of a uranium hexafluoride (UF 6 ) cylinder suspended from the LCBWS while the cylinder is in the process of being weighed. Portability is achieved by its attachment to a double-hook, overhead-bridge crane. The LCBWS prototype is designed to weigh 9.07- and 12.70-metric ton (10- and 14-ton) UF 6 cylinders. A detailed description of the LCBWS is given, design information and criteria are supplied, a testing procedure is outlined, and initial test results are reported. A major objective of the testing is to determine the reliability and accuracy of the system. Other testing objectives include the identification of (1) potential areas for system improvements and (2) procedural modifications that will reflect an improved and more efficient system. The testing procedure described includes, but is not limited to, methods that account for temperature sensitivity of the instrumentation, the local variation in the acceleration due to gravity, and buoyance effects. Operational and safety considerations are noted. A preliminary evaluation of the March test data indicates that the LCBWS prototype has the potential to have an accuracy in the vicinity of 1 kg

  15. Design of Object-based Information System Prototype

    OpenAIRE

    Suhyeon Yoo; Sumi Shin; Hyesun Kim

    2014-01-01

    Researchers who use science and technology information were found to ask an information service in which they can excerpt the contents they needed, rather than using the information at article level. In this study, we micronized the contents of scholarly articles into text, image, and table and then constructed a micro-content DB to design a new information system prototype based on this micro-content. After designing the prototype, we performed usability test for this prototype so as to conf...

  16. Design and Prototyping of a High Granularity Scintillator Calorimeter

    International Nuclear Information System (INIS)

    Zutshi, Vishnu

    2016-01-01

    A novel approach for constructing fine-granularity scintillator calorimeters, based on the concept of an Integrated Readout Layer (IRL) was developed. The IRL consists of a printed circuit board inside the detector which supports the directly-coupled scintillator tiles, connects to the surface-mount SiPMs and carries the necessary front-end electronics and signal/bias traces. Prototype IRLs using this concept were designed, prototyped and successfully exposed to test beams. Concepts and implementations of an IRL carried out with funds associated with this contract promise to result in the next generation of scintillator calorimeters.

  17. Design and Prototyping of a High Granularity Scintillator Calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Zutshi, Vishnu [Northern Illinois Univ., DeKalb, IL (United States). Dept. of Physics

    2016-03-27

    A novel approach for constructing fine-granularity scintillator calorimeters, based on the concept of an Integrated Readout Layer (IRL) was developed. The IRL consists of a printed circuit board inside the detector which supports the directly-coupled scintillator tiles, connects to the surface-mount SiPMs and carries the necessary front-end electronics and signal/bias traces. Prototype IRLs using this concept were designed, prototyped and successfully exposed to test beams. Concepts and implementations of an IRL carried out with funds associated with this contract promise to result in the next generation of scintillator calorimeters.

  18. MMSW. A large-size micromegas quadruplet prototype. Reconstruction efficiency and spatial resolution

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Tai-Hua; Duedder, Andreas; Schott, Matthias; Valderanis, Chrysostomos [Johannes Gutenberg-Universitaet, Mainz (Germany); Bianco, Michele; Danielsson, Hans; Degrange, Jordan; De Oliveira, Rui; Farina, Edoardo; Kuger, Fabian; Iengo, Paolo; Perez Gomez, Francisco; Sekhniaidze, Givi; Sidiropoulou, Ourania; Vergain, Maurice; Wotschack, Joerg [CERN, Geneva (Switzerland)

    2016-07-01

    One of the upgrades of the ATLAS detector for Run III and beyond is the replacement of the inner part of end cap muon tracking spectrometer with eight layers of resistive micromegas detectors. The performance of two prototype detectors, MMSW (MicroMegas Small Wheel), that adopt the design foreseen for this upgrade was studied. The prototype detectors were tested at the Mainz Microtron for the spatial resolution, with cosmic rays for the reconstruction efficiency and for high rate tests in the new Gamma Irradiation Facility (GIF++) at CERN. These measurements with analysis methods and results will be presented. First performance results are consistent with the ATLAS New Small Wheel requirements.

  19. A prototype imaging second harmonic interferometer

    International Nuclear Information System (INIS)

    Jobes, F.C.; Bretz, N.L.

    1997-01-01

    We have built a prototype imaging second harmonic interferometer, which is intended to test critical elements of a design for a tangential array interferometer on C-Mod 6 . The prototype uses a pulsed, 35 mJ, 10 Hz multimode, Nd:YAG laser, LiB 3 O 5 doublers, a fan beam created by a cylindrical lens, four retroreflector elements, and a CCD camera as a detector. The prototype also uses a polarization scheme in which the interference information is eventually carried by two second harmonic beams with crossed polarization. These are vector summed and differenced, and separated, by a Wollaston prism, to give two spots on the CCD. There is a pair of these spots for each retroreflector used. The phase information is directly available as the ratio of the difference to sum the intensities of the two spots. We have tested a single channel configuration of this prototype, varying the phase by changing the pressure in an air cell, and we have obtained a 5:1 light to dark ratio, and a clear sinusoidal variation of the ratio as a function of pressure change. copyright 1997 American Institute of Physics

  20. Fabrication and tests of prototype quadrupole magnets for the storage ring of the Advanced Photon Source

    International Nuclear Information System (INIS)

    Kim, S.H.; Thompson, K.M.; Black, E.L.; Jagger, J.M.

    1991-01-01

    Prototype quadrupole magnets for the APS storage ring have been fabricated and tested. Mechanical stability of the magnet poles and acceptable field quality have been achieved. Geometries of the pole-end bevels have been studied in order to simplify the design of the magnet end-plate. The field saturation at different segments of the magnet has been measured to evaluate the magnet efficiency

  1. Irradiation and examination results of the AC-3 mixed-carbide test

    International Nuclear Information System (INIS)

    Mason, R.E.; Hoth, C.W.; Stratton, R.W.; Botta, F.

    1992-01-01

    The AC-3 test was a cooperative Swiss/US irradiation test of mixed-carbide, (U,Pr)C, fuel pins in the Fast Flux Test Facility. The test included 25 Swiss-fabricated sphere-pac-type fuel pins and 66 U.S. fabricated pellet-type fuel pins. The test was designed to operate at prototypical fast reactor conditions to provide a direct comparison of the irradiation performance of the two fuel types. The test design and fuel fabrication processes used for the AC-3 test are presented

  2. The influence of prototype fidelity and aesthetics of design in usability tests: effects on user behaviour, subjective evaluation and emotion.

    Science.gov (United States)

    Sauer, Juergen; Sonderegger, Andreas

    2009-07-01

    An empirical study examined the impact of prototype fidelity on user behaviour, subjective user evaluation and emotion. The independent factors of prototype fidelity (paper prototype, computer prototype, fully operational appliance) and aesthetics of design (high vs. moderate) were varied in a between-subjects design. The 60 participants of the experiment were asked to complete two typical tasks of mobile phone usage: sending a text message and suppressing a phone number. Both performance data and a number of subjective measures were recorded. The results suggested that task completion time may be overestimated when a computer prototype is being used. Furthermore, users appeared to compensate for deficiencies in aesthetic design by overrating the aesthetic qualities of reduced fidelity prototypes. Finally, user emotions were more positively affected by the operation of the more attractive mobile phone than by the less appealing one.

  3. A Software Prototype Development of Human System Interfaces for Human Factors Engineering Validation Tests of SMART MCR

    International Nuclear Information System (INIS)

    Lim, Jong Tae; Kang, Young Sun; Park, Byung Yul; Han, Kwan Ho; Yang, Sung Won; Oh, In Su; Kim, Myung Ju; Bae, Mun Jin; Nam, Gi Ho; Lim, Do Yeun

    2009-12-01

    This report's aim is to develop a software prototype that will be used in the partial dynamic mockup of SMART MCR(main control room). The software mainly consist of the plant a dynamic model and various operation displays that will be installed into MCR. They includes the codes such as main data processing logics like alarm reduction logic and display methods like ecological interface display and elastic tile alarm display developed by KAERI. The unit test and integrated test of them are performed according to predefined test procedure

  4. Initial results of NEXT-DEMO, a large-scale prototype of the NEXT-100 experiment

    International Nuclear Information System (INIS)

    Álvarez, V; Cárcel, S; Cervera, A; Díaz, J; Ferrario, P; Gil, A; Borges, F I G; Conde, C A N; Dias, T H V T; Fernandes, L M P; Freitas, E D C; Castel, J; Cebrián, S; Dafni, T; Egorov, M; Gehman, V M; Goldschmidt, A; Esteve, R; Evtoukhovitch, P; Ferreira, A L

    2013-01-01

    NEXT-DEMO is a large-scale prototype of the NEXT-100 detector, an electroluminescent time projection chamber that will search for the neutrinoless double beta decay of XE using 100–150 kg of enriched xenon gas. NEXT-DEMO was built to prove the expected performance of NEXT-100, namely, energy resolution better than 1% FWHM at 2.5 MeV and event topological reconstruction. In this paper we describe the prototype and its initial results. A resolution of 1.75% FWHM at 511 keV (which extrapolates to 0.8% FWHM at 2.5 MeV) was obtained at 10 bar pressure using a gamma-ray calibration source. Also, a basic study of the event topology along the longitudinal coordinate is presented, proving that it is possible to identify the distinct dE/dx of electron tracks in high-pressure xenon using an electroluminescence TPC.

  5. OPAL jet chamber full scale prototype

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, H M; Hauschild, M; Hartmann, H; Hegerath, A; Boerner, H; Burckhart, H J; Dittmar, M; Hammarstroem, R; Heuer, R D; Mazzone, L

    1986-12-01

    The concept of a jet chamber for the central detector of OPAL has been tested with a full scale prototype. The design of this prototype, its mechanical and electrical structure and its support system for high voltage, gas, laser calibration and readout are described. Operating experience has been gathered since summer 1984. The chamber performance in terms of spatial resolution and particle identification capability is given.

  6. OPAL jet chamber full-scale prototype

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, H M; Hauschild, M; Hartmann, H; Hegerath, A; Boerner, H; Burckhart, H J; Dittmar, M; Hammarstroem, R; Heuer, R D; Mazzone, L

    1986-12-01

    The concept of a jet chamber for the central detector of OPAL was tested with a full scale prototype. The design of this prototype, its mechanical and electrical structure and its support system for high voltage, gas, laser calibration, and readout are described. Operating experience was gathered since summer 1984. The chamber performance in terms of spatial resolution and particle identification capability is given.

  7. Development of an Exploration-Class Cascade Distillation Subsystem: Performance Testing of the Generation 1.0 Prototype

    Science.gov (United States)

    Callahan, Michael R.; Sargusingh, Miriam J.

    2015-01-01

    The ability to recover and purify water is crucial for realizing long-term human space missions. The National Aeronautics and Space Admininstration and Honeywell co-developed a five-stage vacuum rotary distillation water recovery system referred to as the Cascade Distillation Subsystem (CDS). Over the past three years, NASA's Advanced Exploration Systems (AES) Water Recovery Project (WRP) has been working toward the development of a flight-forward CDS design. In 2012 the original CDS prototype underwent a series of incremental upgrades and tests intened to both demonstrate the feasibility of a on-orbit demonstration of the system and to collect operational and performance data to be used to inform a second generation design. The latest testing of the CDS Generation 1.0 prototype was conducted May 29 through July 2, 2014. Initial system performance was benchmarked by processing deionized water and sodium chloride. Following, the system was challenged with analogue urine waste stream solutions stabilized with an Oxone-based and the two International Space Station baseline and alternative pretreatment solutions. During testing, the system processed more than 160 kilograms of wastewater with targeted water recoveries between 75 and 85% depending on the specific waste stream tested. For all wastewater streams, contaminant removals from wastewater feed to product water distillate, were estimated at greater than 99%. The average specific energy of the system was less than 120 Watt-hours/kilogram. The following paper provides detailed information and data on the performance of the CDS as challenged per the WRP test objectives.

  8. Initial tests of a prototype MRI-compatible PET imager

    International Nuclear Information System (INIS)

    Raylman, Raymond R.; Majewski, Stan; Lemieux, Susan; Velan, S. Sendhil; Kross, Brain; Popov, Vladimir; Smith, Mark F.; Weisenberger, Andrew G.; Wojcik, Randy

    2006-01-01

    Multi-modality imaging is rapidly becoming a valuable tool in the diagnosis of disease and in the development of new drugs. Functional images produced with PET fused with anatomical structure images created by MRI, will allow the correlation of form with function. Our group (a collaboration of West Virginia University and Jefferson Lab) is developing a system to acquire MRI and PET images contemporaneously. The prototype device consists of two opposed detector heads, operating in coincidence mode with an active FOV of 5x5x4 cm 3 . Each MRI-PET detector module consists of an array of LSO detector elements (2.5x2.5x15 mm 3 ) coupled through a long fiber optic light guide to a single Hamamatsu flat panel PSPMT. The fiber optic light guide is made of a glued assembly of 2 mm diameter acrylic fibers with a total length of 2.5 m. The use of a light guides allows the PSPMTs to be positioned outside the bore of the 3 T General Electric MRI scanner used in the tests. Photon attenuation in the light guides resulted in an energy resolution of ∼60% FWHM, interaction of the magnetic field with PSPMT further reduced energy resolution to ∼85% FWHM. Despite this effect, excellent multi-plane PET and MRI images of a simple disk phantom were acquired simultaneously. Future work includes improved light guides, optimized magnetic shielding for the PSPMTs, construction of specialized coils to permit high-resolution MRI imaging, and use of the system to perform simultaneous PET and MRI or MR-spectroscopy

  9. Beam tests of prototype fiber detectors for the H1 forward proton spectrometer

    International Nuclear Information System (INIS)

    Baehr, J.; Hiller, K.; Hoffmann, B.; Luedecke, H.; Menchikov, A.; Nahnhauer, R.; Roloff, H.E.; Tonisch, F.; Voelkert, R.

    1994-07-01

    Different prototypes of fiber detectors with an internal trigger system were tested in a 5 GeV electron beam at DESY. A silicon microstrip telescope was used for an external reference measurement of the beam to study the spatial resolution of the fiber detectors. On average 75% of all crossing electron tracks could be reconstructed with a precision better than 150 μm. These successful methodical investigations led to the installation of similar detectors in the proton beamline 81 m downstream of the central H1-detector at HERA as part of a forward proton spectrometer in spring 1994. (orig.)

  10. Beam tests of prototype fiber detectors for the H1 forward proton spectrometer

    International Nuclear Information System (INIS)

    Baehr, J.; Hiller, K.; Hoffmann, B.; Luedecke, H.; Menchikov, A.; Nahnhauer, R.; Roloff, H.E.; Tonisch, F.; Voelkert, R.

    1995-01-01

    Different prototypes of fiber detectors with an internal trigger system were tested in a 5 GeV electron beam at DESY. A silicon microstrip telescope was used for an external reference measurement of the beam to study the spatial resolution of the fiber detectors. On average 75% of all crossing electron tracks could be reconstructed with a precision better than 150 μm. These successful methodical investigations led to the installation of similar detectors in the proton beamline 81 m downstream of the central H1-detector at HERA as part of a forward proton spectrometer in spring 1994. (orig.)

  11. Contribution of prototypic material tests on the Plinius platform to the study of nuclear reactor severe accident

    International Nuclear Information System (INIS)

    Journeau, Ch.

    2008-01-01

    The PLINIUS experimental platform at CEA Cadarache is dedicated to the experimental study of nuclear reactor severe accidents thanks to experiments between 2000 and 3500 K with prototypic corium. Corium is the mixture that would be formed by an hypothetical core melting and its mixing with structural materials. Prototypical corium has the same chemical composition as the corium corresponding to a given accident scenario but has a different isotopic composition (use of depleted uranium,...). Research programs and test series have been performed to study corium thermophysical properties, fission product behaviour, corium spreading, solidification and interaction with concrete as well as its coolability. It was the frame of research training of many students and was realized within national, European and international collaborations. (author)

  12. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project, UAS Control and Non-Payload Communication System Phase-1 Flight Test Results

    Science.gov (United States)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the prototype radio development, and results from phase 1 flight tests conducted during 2013.

  13. RK-TBA prototype RF source

    International Nuclear Information System (INIS)

    Houck, T.; Anderson, D.; Giordano, G.

    1996-01-01

    A prototype rf power source based on the Relativistic Klystron Two-Beam Accelerator (RK-TBA) concept is being constructed at the Lawrence Berkeley National Laboratory to study physics, engineering, and costing issues. The prototype is described and compared to a full scale design appropriate for driving the Next Linear Collider (NLC). Specific details of the induction core tests and pulsed power system are presented. The 1-MeV, 1.2-kA induction gun currently under construction is also described in detail

  14. Manufacturing, assembly and tests of SPIDER Vacuum Vessel to develop and test a prototype of ITER neutral beam ion source

    Energy Technology Data Exchange (ETDEWEB)

    Zaccaria, Pierluigi, E-mail: pierluigi.zaccaria@igi.cnr.it [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete S.p.A.), Padova (Italy); Valente, Matteo; Rigato, Wladi; Dal Bello, Samuele; Marcuzzi, Diego; Agostini, Fabio Degli; Rossetto, Federico; Tollin, Marco [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete S.p.A.), Padova (Italy); Masiello, Antonio [Fusion for Energy F4E, Barcelona (Spain); Corniani, Giorgio; Badalocchi, Matteo; Bettero, Riccardo; Rizzetto, Dario [Ettore Zanon S.p.A., Schio (VI) (Italy)

    2015-10-15

    Highlights: • The SPIDER experiment aims to qualify and optimize the ion source for ITER injectors. • The large SPIDER Vacuum Vessel was built and it is under testing at the supplier. • The main working and assembly steps for production are presented in the paper. - Abstract: The SPIDER experiment (Source for the Production of Ions of Deuterium Extracted from an RF plasma) aims to qualify and optimize the full size prototype of the negative ion source foreseen for MITICA (full size ITER injector prototype) and the ITER Heating and Current Drive Injectors. Both SPIDER and MITICA experiments are presently under construction at Consorzio RFX in Padova (I), with the financial support from IO (ITER Organization), Fusion for Energy, Italian research institutions and contributions from Japan and India Domestic Agencies. The vacuum vessel hosting the SPIDER in-vessel components (Beam Source and calorimeters) has been manufactured, assembled and tested during the last two years 2013–2014. The cylindrical vessel, about 6 m long and 4 m in diameter, is composed of two cylindrical modules and two torispherical lids at the ends. All the parts are made by AISI 304 L stainless steel. The possibility of opening/closing the vessel for monitoring, maintenance or modifications of internal components is guaranteed by bolted junctions and suitable movable support structures running on rails fixed to the building floor. A large number of ports, about one hundred, are present on the vessel walls for diagnostic and service purposes. The main working steps for construction and specific technological issues encountered and solved for production are presented in the paper. Assembly sequences and tests on site are furthermore described in detail, highlighting all the criteria and requirements for correct positioning and testing of performances.

  15. Manufacturing, assembly and tests of SPIDER Vacuum Vessel to develop and test a prototype of ITER neutral beam ion source

    International Nuclear Information System (INIS)

    Zaccaria, Pierluigi; Valente, Matteo; Rigato, Wladi; Dal Bello, Samuele; Marcuzzi, Diego; Agostini, Fabio Degli; Rossetto, Federico; Tollin, Marco; Masiello, Antonio; Corniani, Giorgio; Badalocchi, Matteo; Bettero, Riccardo; Rizzetto, Dario

    2015-01-01

    Highlights: • The SPIDER experiment aims to qualify and optimize the ion source for ITER injectors. • The large SPIDER Vacuum Vessel was built and it is under testing at the supplier. • The main working and assembly steps for production are presented in the paper. - Abstract: The SPIDER experiment (Source for the Production of Ions of Deuterium Extracted from an RF plasma) aims to qualify and optimize the full size prototype of the negative ion source foreseen for MITICA (full size ITER injector prototype) and the ITER Heating and Current Drive Injectors. Both SPIDER and MITICA experiments are presently under construction at Consorzio RFX in Padova (I), with the financial support from IO (ITER Organization), Fusion for Energy, Italian research institutions and contributions from Japan and India Domestic Agencies. The vacuum vessel hosting the SPIDER in-vessel components (Beam Source and calorimeters) has been manufactured, assembled and tested during the last two years 2013–2014. The cylindrical vessel, about 6 m long and 4 m in diameter, is composed of two cylindrical modules and two torispherical lids at the ends. All the parts are made by AISI 304 L stainless steel. The possibility of opening/closing the vessel for monitoring, maintenance or modifications of internal components is guaranteed by bolted junctions and suitable movable support structures running on rails fixed to the building floor. A large number of ports, about one hundred, are present on the vessel walls for diagnostic and service purposes. The main working steps for construction and specific technological issues encountered and solved for production are presented in the paper. Assembly sequences and tests on site are furthermore described in detail, highlighting all the criteria and requirements for correct positioning and testing of performances.

  16. A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brennan T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Welch, Tim [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lee, Kyutae [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DeNeale, Scott T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevelhimer, Mark S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burress, Timothy A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pracheil, Brenda M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pries, Jason L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); O' Connor, Patrick W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Curd, Shelaine L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ekici, Kivanc [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Papanicolaou, Thanos [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Tsakiris, Achilleas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Kutz, Benjamin [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Bishop, Norm [Knight Piesold, Denver, CO (United States); McKeown, Alisha [McKeown and Associates, Moberly, MO (United States); Rabon, Daniel [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Zimmerman, Gregory P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Uria Martinez, Rocio [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamay, Ryan A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-02-01

    The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders. To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.

  17. A full-scale prototype for the tracking chambers of the ALICE muon spectrometer. Part II- Electronics. Preamplifier; Read-out prototype

    Energy Technology Data Exchange (ETDEWEB)

    Courtat, P.; Charlet, D.; Lebon, S.; Martin, J.M.; Sellem, R.; Wanlin, E. [CEA Centre d' Etudes Nucleaires de Saclay, 91 - Gif-sur-Yvette (France). Service d' Electronique Physique; Douet, R.; Harroch, H.; Bimbot, L.; Jouan, D.; Kharmandarian, L.; Le Bornec, Y.; Mac Cormick, M.; Willis, N. [Paris-11 Univ., 91 - Orsay (France). Institut de Physique Nucleaire

    1999-07-01

    A full scale prototype of one module of the first tracking station has already been constructed. It will be equipped with the new read-out electronics proposed for the final chambers. Before integration of the whole chain, tests have been carried out on the individual components in discrete circuit prototypes. The different parts of the chain are described, together with the tests performed. The final version with integrated circuits in then described. (author)

  18. A full-scale prototype for the tracking chambers of the ALICE muon spectrometer. Part II- Electronics. Preamplifier; Read-out prototype

    International Nuclear Information System (INIS)

    Courtat, P.; Charlet, D.; Lebon, S.; Martin, J.M.; Sellem, R.; Wanlin, E.; Douet, R.; Harroch, H.; Bimbot, L.; Jouan, D.; Kharmandarian, L.; Le Bornec, Y.; Mac Cormick, M.; Willis, N.

    1999-01-01

    A full scale prototype of one module of the first tracking station has already been constructed. It will be equipped with the new read-out electronics proposed for the final chambers. Before integration of the whole chain, tests have been carried out on the individual components in discrete circuit prototypes. The different parts of the chain are described, together with the tests performed. The final version with integrated circuits in then described. (author)

  19. Design description and validation results for the IFMIF High Flux Test Module as outcome of the EVEDA phase

    Directory of Open Access Journals (Sweden)

    F. Arbeiter

    2016-12-01

    Full Text Available During the Engineering Validation and Engineering Design Activities (EVEDA phase (2007-2014 of the International Fusion Materials Irradiation Facility (IFMIF, an advanced engineering design of the High Flux Test Module (HFTM has been developed with the objective to facilitate the controlled irradiation of steel samples in the high flux area directly behind the IFMIF neutron source. The development process addressed included manufacturing techniques, CAD, neutronic, thermal-hydraulic and mechanical analyses complemented by a series of validation activities. Validation included manufacturing of 1:1 parts and mockups, test of prototypes in the FLEX and HELOKA-LP helium loops of KIT for verification of the thermal and mechanical properties, and irradiation of specimen filled capsule prototypes in the BR2 test reactor. The prototyping activities were backed by several R&D studies addressing focused issues like handling of liquid NaK (as filling medium and insertion of Small Specimen Test Technique (SSTT specimens into the irradiation capsules. This paper provides an up-todate design description of the HFTM irradiation device, and reports on the achieved performance criteria related to the requirements. Results of the validation activities are accounted for and the most important issues for further development are identified.

  20. Control and Non-Payload Communications (CNPC) Prototype Radio - Generation 2 Security Architecture Lab Test Report

    Science.gov (United States)

    Iannicca, Dennis C.; McKim, James H.; Stewart, David H.; Thadhani, Suresh K.; Young, Daniel P.

    2015-01-01

    NASA Glenn Research Center, in cooperation with Rockwell Collins, is working to develop a prototype Control and Non-Payload Communications (CNPC) radio platform as part of NASA Integrated Systems Research Program's (ISRP) Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. A primary focus of the project is to work with the FAA and industry standards bodies to build and demonstrate a safe, secure, and efficient CNPC architecture that can be used by industry to evaluate the feasibility of deploying a system using these technologies in an operational capacity. GRC has been working in conjunction with these groups to assess threats, identify security requirements, and to develop a system of standards-based security controls that can be applied to the current GRC prototype CNPC architecture as a demonstration platform. The security controls were integrated into a lab test bed mock-up of the Mobile IPv6 architecture currently being used for NASA flight testing, and a series of network tests were conducted to evaluate the security overhead of the controls compared to the baseline CNPC link without any security. The aim of testing was to evaluate the performance impact of the additional security control overhead when added to the Mobile IPv6 architecture in various modes of operation. The statistics collected included packet captures at points along the path to gauge packet size as the sample data traversed the CNPC network, round trip latency, jitter, and throughput. The effort involved a series of tests of the baseline link, a link with Robust Header Compression (ROHC) and without security controls, a link with security controls and without ROHC, and finally a link with both ROHC and security controls enabled. The effort demonstrated that ROHC is both desirable and necessary to offset the additional expected overhead of applying security controls to the CNPC link.

  1. Tests of prototype salt stripper system for IFR fuel cycle

    International Nuclear Information System (INIS)

    Carls, E.L.; Blaskovitz, R.J.; Johnson, T.R.; Ogata, T.

    1993-01-01

    One of the waste treatment steps for the on-site reprocessing of spent fuel from the Integral Fast Reactor fuel cycles is stripping of the electrolyte salt used in the electrorefining process. This involves the chemical reduction of the actinides and rare earth chlorides forming metals which then dissolve in a cadmium pool. To develop the equipment for this step, a prototype salt stripper system has been installed in an engineering scale argon-filled glovebox. Pumping trails were successful in transferring 90 kg of LiCl-KCl salt containing uranium and rare earth metal chlorides at 500 degree C from an electrorefiner to the stripper vessel at a pumping rate of about 5 L/min. The freeze seal solder connectors which were used to join sections of the pump and transfer line performed well. Stripping tests have commenced employing an inverted cup charging device to introduce a Cd-15 wt % Li alloy reductant to the stripper vessel

  2. Development of the power supplies of the prototype ion source for the EAST

    International Nuclear Information System (INIS)

    Liu Zhimin; Hu Chundong; Liu Sheng; Jiang Caichao; Song Shihua; Xie Yahong; Sheng Peng

    2011-01-01

    For the neutral beam injector (NBI) of the Experimental Advanced Superconducting Tokamak (EAST), a test stand of a high-current ion source has been in construction. The NBI power supply system includes the plasma generator power supply, plasma electrode power supply, high voltage power divider, negative high voltage power supply, and the transmission lines and the snubber. A multi-megawatt prototype ion source was developed. The arc discharge of the prototype ion source was obtained in the test. The test results for the ion source power supplies and the arc discharge of the ion source are presented. (authors)

  3. ABOUT MODERN TECHNICAL GRAPHICS USING IN THE VIRTUAL PROTOTYPING

    Directory of Open Access Journals (Sweden)

    GHERGHINA George

    2008-07-01

    Full Text Available The paper presents aspects concerning the using of modern technical graphics elements in the virtual prototyping. The virtual prototyping is a process which uses a virtual prototype in place of physical prototype for the testing and the evaluation of specific features of designed product. The virtual prototype is created by computer such as it could assign the specific features as close as possible to the real conditions which permit its function simulation in the conditions for which is designed. The virtual prototyping permits the replacing of classical design process, although, and the elaboration of graphicalm documentation, which represent an important work volume – with CAD/CAM systems in the increased efficiency conditions.

  4. Prototype of a high speed pellet launcher for JET

    International Nuclear Information System (INIS)

    Sonnenberg, K.; Kupschus, P.; Helm, J.; Flory, D.; Zacchia, F.

    1989-01-01

    JET is planning to build a high speed prototype pellet injector cap0able of delivering single D 2 -ice pellets, one per plasma pulse, with a velocity of up to 5 kms -1 . The prototype will be based on a 2-stage gun system which is presently being developed at JET using a test stand. One gun of the teststand will be transformed into the prototype used at the torus. Earlier tests have shown that D 2 -ice pellets can only sustain peak accelerations of 5x10 6 ms -2 without breaking and that they suffer from an erosion effect in the barrel limiting the pellet velocity to about 2.7 kms -1 . Results are presented proving that these problems can be overcome by accelerating the ice in a protective sabot (cartridge). With this method velocities of up to 3.8 kms -1 have been obtained. The sabot technique, however, requires a separation of the sabot from the pellet before this is injected into the plasma. Three possible separation methods are described and experimental results of one of them are presented. Also improvements of the gun are discussed which allow to operate the gun by remote control. (author). 5 refs.; 5 figs

  5. H4DAQ: a modern and versatile data-acquisition package for calorimeter prototypes test-beams

    Science.gov (United States)

    Marini, A. C.

    2018-02-01

    The upgrade of the particle detectors for the HL-LHC or for future colliders requires an extensive program of tests to qualify different detector prototypes with dedicated test beams. A common data-acquisition system, H4DAQ, was developed for the H4 test beam line at the North Area of the CERN SPS in 2014 and it has since been adopted in various applications for the CMS experiment and AIDA project. Several calorimeter prototypes and precision timing detectors have used our system from 2014 to 2017. H4DAQ has proven to be a versatile application and has been ported to many other beam test environments. H4DAQ is fast, simple, modular and can be configured to support various kinds of setup. The functionalities of the DAQ core software are split into three configurable finite state machines: data readout, run control, and event builder. The distribution of information and data between the various computers is performed using ZEROMQ (0MQ) sockets. Plugins are available to read different types of hardware, including VME crates with many types of boards, PADE boards, custom front-end boards and beam instrumentation devices. The raw data are saved as ROOT files, using the CERN C++ ROOT libraries. A Graphical User Interface, based on the python gtk libraries, is used to operate the H4DAQ and an integrated data quality monitoring (DQM), written in C++, allows for fast processing of the events for quick feedback to the user. As the 0MQ libraries are also available for the National Instruments LabVIEW program, this environment can easily be integrated within H4DAQ applications.

  6. A multi-layered approach to product architecture modeling: Applied to technology prototypes

    DEFF Research Database (Denmark)

    Ravn, Poul Martin; Guðlaugsson, Tómas Vignir; Mortensen, Niels Henrik

    2016-01-01

    Companies that wish to include novel technology in the product portfolio may need to test and evaluate the technology with the use of prototypes to learn its benefits. Without clear knowledge of the benefits of the technology to the products in the portfolio, in the form of increased performance...... and managing technology prototypes and can be correlated with improvements in the team collaboration, communication, and development performance......., added functions, or material savings, the prototype development can be hard to manage. In this article, two contributions are made. The first adds to the vocabulary of prototyping, defining technology prototype, a prototype used for testing a novel technology in the context of an existing product...

  7. Design and fabrication of a 50 MWt prototypical MHD coal-fired combustor

    International Nuclear Information System (INIS)

    Albright, J.; Braswell, R.; Listvinsky, G.; McAllister, M.; Myrick, S.; Ono, D.; Thom, H.

    1992-01-01

    A prototypical 50 MWt coal-fired combustor has been designed and fabricated as part of the Magnetohydrodynamic (MHD) Integrated Topping Cycle (ITC) Program. This is a DOE-funded program to develop a prototypical MHD power train to be tested at the Component Development and Integration Facility (CDIF) in Butte, Montana. The prototypical combustor is an outgrowth of the 50 MWt workhorse combustor which has previously been tested at the CDIF. In addition to meeting established performance criteria of the existing 50 MWt workhorse combustor, the prototypical combustor design is required to be scaleable for use at the 250 MWt retrofit level. This paper presents an overview of the mechanical design of the prototypical combustor and a description of its fabrication. Fabrication of the 50 MWt prototypical coal-fired combustor was completed in February 1992 and hot-fire testing is scheduled to begin in May 1992

  8. OPAL jet chamber full scale prototype

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, H M; Hauschild, M; Hartmann, H; Hegerath, A; Boerner, H; Burckhart, H J; Dittmar, M; Hammarstreom, R; Heuer, R D; Mazzone, L

    1986-05-22

    The concept of a jet chamber for the central detector of OPAL has been tested with a full scale prototype. The design of this prototype, its mechanical and electrical structure and its support system for high voltage, gas, laser calibration and readout are described. The operating experience gathered since the summer of 1984 and the chamber performance as measured by its spatial resolution and ability to identify particles are also given.

  9. Operation of the Electronics for the AMS-02RICH Detector Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Aguayo, P.; Aguilar, M.; Berdugo, J.; Casaus, J.; Delgado, C.; Diaz, C.; Fernandez, C.; Garcia-Tabares, L.; Lanciotti, E.; Mana, C.; Marin, J.; Martinez, G.; Palomares, C.; Sanchez, E.; Sevilla, I.; Torrento, A.; Wilmott, C.; Yanez, J.

    2002-07-01

    The operation and behaviour of the RICH prototype electronics developed for the AMS-02 experiment is presented. It includes results and conclusions obtained from experimental tests data with cosmic rays. (Author)

  10. Testing of a prototype of calibration facility for noble gas monitoring using 41Ar

    International Nuclear Information System (INIS)

    Saibathulham, Holnisar; Wurdiyanto, Gatot; Marsum, Pujadi

    2012-01-01

    A prototype of a calibration facility for noble gas monitoring using 41 Ar in the PTKMR-BATAN has been tested. The facility was designed in such a way that the standard source of gas can be reused. The radioactive 41 Ar source was obtained by thermal neutron reaction of 40 Ar(n, γ) 41 Ar using a thermal neutron flux of 4.8×10 13 neutrons per cm 2 per second in two minutes on the multipurpose G.A. Siwabessy Reactor (Batan, Serpong, Indonesia). Gamma spectrometry was used to measure the radioactivity and purity of 41 Ar. The spectrum of the 41 Ar observed yields an energy of 1294 keV because of the highest intensity (99.2%). The activity of 41 Ar was 2821 kBq and 4% of the expanded uncertainty. The time required for 41 Ar to reach homogeneity was 7 min, and the effectiveness of resuse was 53%. - Highlights: ► Testing of a calibration facility prototype for noble gas monitor using 41 Ar in PTKMR-BATAN. ► This facility was designed such that a standard radioactive gas source can be used repeatedly. ► Standardization of the 41 Ar is performed using gamma spectrometry. ► The time required for the 41 Ar gas to be distributed evenly throughout the cavity of the facility was 7 min. ► The effectiveness of repeated use was 53%.

  11. First results from the characterization of a three-dimensional deep N-well MAPS prototype for vertexing applications

    International Nuclear Information System (INIS)

    Ratti, L.; Gaioni, L.; Manazza, A.; Manghisoni, M.; Re, V.; Traversi, G.

    2013-01-01

    The prototype of a three-dimensional (3D) monolithic active pixel sensor (MAPS) has been characterized. The device, featuring a 20μm pitch, was designed based on the same approach that was adopted in developing the so-called deep N-well (DNW) MAPS in planar CMOS process. The new 3D design relies upon stacking two homogeneous tiers fabricated in a 130 nm CMOS technology. Different kinds of test structures, including single pixels, 3×3 arrays and 8×8 and 16×16 matrices were tested. Functionality of the collecting deep N-well electrode, the analog front-end and the digital readout electronics has been demonstrated. Inter-tier communication was found to work properly in the case of redundant interconnection and could be exploited for the test of the analog pixel section. On the other hand, inter-tier interconnections based on individual bond pads were proven ineffective likely due to wafer misalignment. -- Highlights: ► First results on the characterization of 3D DNW monolithic sensor. ► Functionality of the analog and digital sections is demonstrated. ► DNW collecting electrode is tested by means of a laser source. ► A non-linear model for charge preamplifier response is discussed. ► Redundant vertical interconnection is shown to work properly.

  12. First results from the characterization of a three-dimensional deep N-well MAPS prototype for vertexing applications

    Energy Technology Data Exchange (ETDEWEB)

    Ratti, L., E-mail: lodovico.ratti@unipv.it [Università di Pavia, Dipartimento di Elettronica, Via Ferrata 1, I-27100 Pavia (Italy); INFN, Sezione di Pavia, Via Bassi 6, I-27100 Pavia (Italy); Gaioni, L. [INFN, Sezione di Pavia, Via Bassi 6, I-27100 Pavia (Italy); Manazza, A. [Università di Pavia, Dipartimento di Elettronica, Via Ferrata 1, I-27100 Pavia (Italy); INFN, Sezione di Pavia, Via Bassi 6, I-27100 Pavia (Italy); Manghisoni, M.; Re, V.; Traversi, G. [Università di Bergamo, Dipartimento di Ingegneria Industriale, Via Marconi 5, I-24044 Dalmine (Italy); INFN, Sezione di Pavia, Via Bassi 6, I-27100 Pavia (Italy)

    2013-01-21

    The prototype of a three-dimensional (3D) monolithic active pixel sensor (MAPS) has been characterized. The device, featuring a 20μm pitch, was designed based on the same approach that was adopted in developing the so-called deep N-well (DNW) MAPS in planar CMOS process. The new 3D design relies upon stacking two homogeneous tiers fabricated in a 130 nm CMOS technology. Different kinds of test structures, including single pixels, 3×3 arrays and 8×8 and 16×16 matrices were tested. Functionality of the collecting deep N-well electrode, the analog front-end and the digital readout electronics has been demonstrated. Inter-tier communication was found to work properly in the case of redundant interconnection and could be exploited for the test of the analog pixel section. On the other hand, inter-tier interconnections based on individual bond pads were proven ineffective likely due to wafer misalignment. -- Highlights: ► First results on the characterization of 3D DNW monolithic sensor. ► Functionality of the analog and digital sections is demonstrated. ► DNW collecting electrode is tested by means of a laser source. ► A non-linear model for charge preamplifier response is discussed. ► Redundant vertical interconnection is shown to work properly.

  13. Results of a first beam test of hadron blind trackers

    Energy Technology Data Exchange (ETDEWEB)

    Chen, M. (Laboratory for Nuclear Science, MIT, Cambridge, MA (United States)); Luckey, D. (Laboratory for Nuclear Science, MIT, Cambridge, MA (United States)); Smolin, M. (Laboratory for Nuclear Science, MIT, Cambridge, MA (United States)); Sumorok, K. (Laboratory for Nuclear Science, MIT, Cambridge, MA (United States)); Zhang, X. (Laboratory for Nuclear Science, MIT, Cambridge, MA (United States)); Bolozdynya, A. (ITEP, Moscow (Russian Federation)); Belogurov, S. (ITEP, Moscow (Russian Federation)); Churakov, D. (ITEP, Moscow (Russian Federation)); Koutchenkov, A. (ITEP, Moscow (Russian Federation)); Kovalenko, A. (ITEP, Moscow (Russian Federation)); Kuzichev, V. (ITEP, Moscow (Russian Federation)); Lebedenko, V. (ITEP, Moscow (Russian Federation)); Sheinkman, V. (ITEP, Moscow (Russian Federation)); Smirnov, G. (ITEP, Moscow (Russian Federation)); Safronov, G. (ITEP, Moscow (Russian Federation)); Vinogradov, V. (ITEP, Moscow (Russian Federation)); Giomataris, Y. (IPN,

    1994-07-15

    We describe the experimental results of a new type of electron tracker, called Hadron Blind Detector or HBD. An HBD prototype was tested with gas mixtures of CF[sub 4] with He or Ne and a parallel plate avalanche chamber having a CsI photocathode of eight pads. Beam tests confirm the large Cherenkov light bandwidth in the EUV region that can be obtained with such gas mixtures. It results in a large quality factor of about 500 cm[sup -1] which allows HBD operation with a much shorter radiator thickness than conventional Cherenkov counters. Full electron efficiency was obtained, while pions were rejected up to momenta of 9 GeV/c. HBD is unique in measuring electron trajectories near the vertex, vetoing Dalitz pairs, and providing trigger on electrons among heavy hadron background. We discuss the use of such detectors for lepton identification and detection in high energy physics experiments and especially in heavy ion colliders. ((orig.))

  14. Results of a first beam test of hadron blind trackers

    International Nuclear Information System (INIS)

    Chen, M.; Luckey, D.; Smolin, M.; Sumorok, K.; Zhang, X.; Bolozdynya, A.; Belogurov, S.; Churakov, D.; Koutchenkov, A.; Kovalenko, A.; Kuzichev, V.; Lebedenko, V.; Sheinkman, V.; Smirnov, G.; Safronov, G.; Vinogradov, V.; Giomataris, Y.; Joseph, C.; Werlen, M.; Charpak, G.; Blumenfeld, B.; Gougas, A.K.; Steele, D.; Akopyan, M.

    1994-01-01

    We describe the experimental results of a new type of electron tracker, called Hadron Blind Detector or HBD. An HBD prototype was tested with gas mixtures of CF 4 with He or Ne and a parallel plate avalanche chamber having a CsI photocathode of eight pads. Beam tests confirm the large Cherenkov light bandwidth in the EUV region that can be obtained with such gas mixtures. It results in a large quality factor of about 500 cm -1 which allows HBD operation with a much shorter radiator thickness than conventional Cherenkov counters. Full electron efficiency was obtained, while pions were rejected up to momenta of 9 GeV/c. HBD is unique in measuring electron trajectories near the vertex, vetoing Dalitz pairs, and providing trigger on electrons among heavy hadron background. We discuss the use of such detectors for lepton identification and detection in high energy physics experiments and especially in heavy ion colliders. ((orig.))

  15. Developing and Testing the Health Care Safety Hotline: A Prototype Consumer Reporting System for Patient Safety Events.

    Science.gov (United States)

    Schneider, Eric C; Ridgely, M Susan; Quigley, Denise D; Hunter, Lauren E; Leuschner, Kristin J; Weingart, Saul N; Weissman, Joel S; Zimmer, Karen P; Giannini, Robert C

    2017-06-01

    This article describes the design, development, and testing of the Health Care Safety Hotline, a prototype consumer reporting system for patient safety events. The prototype was designed and developed with ongoing review by a technical expert panel and feedback obtained during a public comment period. Two health care delivery organizations in one metropolitan area collaborated with the researchers to demonstrate and evaluate the system. The prototype was deployed and elicited information from patients, family members, and caregivers through a website or an 800 phone number. The reports were considered useful and had little overlap with information received by the health care organizations through their usual risk management, customer service, and patient safety monitoring systems. However, the frequency of reporting was lower than anticipated, suggesting that further refinements, including efforts to raise awareness by actively soliciting reports from subjects, might be necessary to substantially increase the volume of useful reports. It is possible that a single technology platform could be built to meet a variety of different patient safety objectives, but it may not be possible to achieve several objectives simultaneously through a single consumer reporting system while also establishing trust with patients, caregivers, and providers.

  16. Science with the ASTRI prototype

    International Nuclear Information System (INIS)

    Sartore, Nicola

    2013-01-01

    ASTRI (Astrofisica a Specchi con Tecnologia Replicante Italiana) is a “Flagship Project” financed by the Italian Ministry of Instruction, University and Research and led by the Italian National Institute of Astrophysics. It represents the Italian proposal for the development of the Small Size Telescope system of the Cherenkov Telescope Array, the next generation observatory for Very High Energy gamma-rays (20 GeV - 100 TeV). The ASTRI end-to-end prototype will be installed at Serra La Nave (Catania, Italy) and it will see the first light at the beginning of 2014. We describe the expected performance of the prototype on few selected test cases of the northern emisphere. The aim of the prototype is to probe the technological solutions and the nominal performance of the various telescope's subsystems

  17. Recognizing human actions by learning and matching shape-motion prototype trees.

    Science.gov (United States)

    Jiang, Zhuolin; Lin, Zhe; Davis, Larry S

    2012-03-01

    A shape-motion prototype-based approach is introduced for action recognition. The approach represents an action as a sequence of prototypes for efficient and flexible action matching in long video sequences. During training, an action prototype tree is learned in a joint shape and motion space via hierarchical K-means clustering and each training sequence is represented as a labeled prototype sequence; then a look-up table of prototype-to-prototype distances is generated. During testing, based on a joint probability model of the actor location and action prototype, the actor is tracked while a frame-to-prototype correspondence is established by maximizing the joint probability, which is efficiently performed by searching the learned prototype tree; then actions are recognized using dynamic prototype sequence matching. Distance measures used for sequence matching are rapidly obtained by look-up table indexing, which is an order of magnitude faster than brute-force computation of frame-to-frame distances. Our approach enables robust action matching in challenging situations (such as moving cameras, dynamic backgrounds) and allows automatic alignment of action sequences. Experimental results demonstrate that our approach achieves recognition rates of 92.86 percent on a large gesture data set (with dynamic backgrounds), 100 percent on the Weizmann action data set, 95.77 percent on the KTH action data set, 88 percent on the UCF sports data set, and 87.27 percent on the CMU action data set.

  18. Performance testing of prototype live loaded packed stem seals for large gate valves in pressurized hot water

    International Nuclear Information System (INIS)

    Pothier, N.E.

    1976-01-01

    Prototype live loaded packed stem seals for large gate valves have been tested in a laboratory. The test fluid was demineralized water at 547 K, 8.27 MPa and pH 10. Nine packing configurations were tested; three different commercial brands of asbestos/graphite valve packings and three different sizes for each packing brand. Conventional and live loaded packed stem seals are briefly described. Stem leakage, packing consolidation and stem friction data are given. For all tests, leakage rates of less than 10 g d -1 were observed. It was also observed that stem friction was significantly affected by thermal expansion of the stem. (author)

  19. Architectural prototyping

    DEFF Research Database (Denmark)

    Bardram, Jakob Eyvind; Christensen, Henrik Bærbak; Hansen, Klaus Marius

    2004-01-01

    A major part of software architecture design is learning how specific architectural designs balance the concerns of stakeholders. We explore the notion of "architectural prototypes", correspondingly architectural prototyping, as a means of using executable prototypes to investigate stakeholders...

  20. Ground tests with prototype of CeBr{sub 3} active gamma ray spectrometer proposed for future venus surface missions

    Energy Technology Data Exchange (ETDEWEB)

    Litvak, M.L., E-mail: litvak@mx.iki.rssi.ru [Space Research Institute, RAS, Moscow 117997 (Russian Federation); Sanin, A.B.; Golovin, D.V. [Space Research Institute, RAS, Moscow 117997 (Russian Federation); Jun, I. [Jet Propulsion Laboratory, Pasadena, CA (United States); Mitrofanov, I.G. [Space Research Institute, RAS, Moscow 117997 (Russian Federation); Shvetsov, V.N.; Timoshenko, G.N. [Joint Institute for Nuclear Research, Dubna (Russian Federation); Vostrukhin, A.A. [Space Research Institute, RAS, Moscow 117997 (Russian Federation)

    2017-03-11

    The results of a series of ground tests with a prototype of an active gamma-ray spectrometer based on a new generation of scintillation crystal (CeBr{sub 3}) are presented together with a consideration to its applicability to future Venus landing missions. We evaluated the instrument's capability to distinguish the subsurface elemental composition of primary rock forming elements such as O, Na, Mg, Al, Si, K and Fe. Our study uses heritage from previous ground and field tests and applies to the analysis of gamma lines from activation reaction products generated by a pulsed neutron generator. We have estimated that the expected accuracies achieved in this approach could be as high as 1–10% for the particular chemical element being studied.

  1. HEDL W-1 SLSF experiment LOPI transient and boiling test results

    International Nuclear Information System (INIS)

    Henderson, J.M.; Wood, S.A.; Rothrock, R.B.

    1980-01-01

    The W-1 Sodium Loop Safety Facility (SLSF) experiment was designed to study the heat release characteristics of fast reactor fuel pins under Loss-of-Piping-Integrity (LOPI) accident conditions and determine stable sodium boiling initiation and recovery limits in a prototypic fuel pin bundle array. The results of the experiment address major second level of assurance (LOA-2) safety issues and provide increased insight and understanding of phenomena that would inherently terminate hypothesized accidents with only limited core damage. The irradiation phase of the experiment, consisting of thirteen individual transients, was performed between May 27 and July 20, 1979. The final transient produced approximately two seconds of coolant boiling, cladding dryout, and incipient fuel pin failure. The facility and test hardware performed as designed, allowing completion of all planned tests and achievement of all test objectives

  2. A CAREM fuel assembly prototype construction in order to verify its mechanical design using hydrodynamic testing

    International Nuclear Information System (INIS)

    Aparicio, Gaspar; Di Marco, Agustin; Falcone, Jose M.; Giorgis, Miguel A.; Mathot, Sergio R.; Migliori, Julio; Orlando, Oscar S.; Restelli, Miguel A.; Ruggirello, Gabriel; Sapia, Gustavo C.; Zinzallari, Fausto; Bianchi, Daniel R.; Volpi, Ricardo M.

    2000-01-01

    The scope of this paper is to describe the activities of several Groups from three Atomic Centers (C. A. Bariloche, C. A. Ezeiza and C. A. Constituyentes), involved in the manufacturing of a CAREM fuel assembly prototype. The Design Group (UAIN-CAB) carried out the fuel assembly engineering. Cladding components were constructed by the Special Alloys Pilot Factory (UAMCN-CAE). Engineering Group (UACN-CAC) manufactured the parts to be processed, resorting to qualified suppliers. Elastic spacers were completely designed and constructed by this Group, and fuel rods, control rods, guide tubes and spacers were also welded here. Research Reactors Fuels Group (UACN-CAC) carried out the dimensional control of the elaborated parts, while Postirradiation Testing Group (UACN-CAC) performed the assembling of the fuel element. This paper also refers to the design and development of special equipment and devices, all of them required for the prototype construction. (author)

  3. Construction and performance of a prototype detector for the ATLAS new small wheel

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Tai-Hua; Schott, Matthias; Valderanis, Chrysostomos; Duedder, Andreas [Johannes Gutenberg-Universitaet Mainz (Germany); Collaboration: ATLAS-Collaboration

    2015-07-01

    One of the upgrades of ATLAS detector for its phase II of operation is the replacement of the inner part of end cap muon spectrometer with resistive micromegas detectors. In this talk we discuss the very first working prototype, a quadruplets detector with an area of 0.5 m{sup 2} per plane in a trapezoid shape. The detailed construction of the prototype which includes the drift and readout layers gluing, gas flowing system mounting and etc. ls presented. The prototype was tested at the Mainz Microtron and with cosmic rays and results are presented. Finally we report on its installation of the prototype to the ATLAS cavern and on the plans for future measurements with it.

  4. Results from an Interval Management (IM) Flight Test and Its Potential Benefit to Air Traffic Management Operations

    Science.gov (United States)

    Baxley, Brian; Swieringa, Kurt; Berckefeldt, Rick; Boyle, Dan

    2017-01-01

    NASA's first Air Traffic Management Technology Demonstration (ATD-1) subproject successfully completed a 19-day flight test of an Interval Management (IM) avionics prototype. The prototype was built based on IM standards, integrated into two test aircraft, and then flown in real-world conditions to determine if the goals of improving aircraft efficiency and airport throughput during high-density arrival operations could be met. The ATD-1 concept of operation integrates advanced arrival scheduling, controller decision support tools, and the IM avionics to enable multiple time-based arrival streams into a high-density terminal airspace. IM contributes by calculating airspeeds that enable an aircraft to achieve a spacing interval behind the preceding aircraft. The IM avionics uses its data (route of flight, position, etc.) and Automatic Dependent Surveillance-Broadcast (ADS-B) state data from the Target aircraft to calculate this airspeed. The flight test demonstrated that the IM avionics prototype met the spacing accuracy design goal for three of the four IM operation types tested. The primary issue requiring attention for future IM work is the high rate of IM speed commands and speed reversals. In total, during this flight test, the IM avionics prototype showed significant promise in contributing to the goals of improving aircraft efficiency and airport throughput.

  5. The VERITAS Prototype and the Upcoming VERITAS Array

    Science.gov (United States)

    VERITAS Collaboration; Badran, H. M.; Blaylock, G.; Bond, I. H.; Boyle, P. J.; Bradbury, S. M.; Buckley, J. H.; Byrum, K.; Carter-Lewis, D. A.; Celik, O.; Cogan, P.; Cui, W.; Daniel, M.; de La Calle Perez, I.; Dowkontt, P.; Duke, C.; Fegan, D. J.; Fegan, S. J.; Finley, J. P.; Fortson, L. F.; Gammell, S.; Gibbs, K.; Gillanders, G. H.; Grube, J.; Guiterrez, K. J.; Hall, J.; Hanna, D.; Holder, J.; Horan, D.; Hughes, S.; Humensky, T. B.; Jung, I.; Kenny, G. E.; Kertzman, M.; Kieda, D.; Kildea, J.; Knapp, J.; Kosack, K.; Krawczynski, H.; Krennrich, F.; Lang, M. J.; Le Bohec, S.; Linton, E.; Lloyd-Evans, J.; Mendoza, D.; Merriman, A.; Milovanovic, A.; Moriarty, P.; Nagai, T.; Olevitch, M.; Ong, R. A.; Pallassini, R.; Perkins, J.; Petry, D.; Pizlo, F.; Pohl, M.; Power-Mooney, B.; Quinn, J.; Quinn, M.; Ragan, K.; Rebillot, P.; Reynolds, P. T.; Rose, H. J.; Schroedter, M.; Sembroski, G. H.; Swordy, S. P.; Syson, A.; Valcarcel, L.; Vassiliev, V. V.; Wagner, R.; Wakely, S. P.; Walker, G.; Weekes, T. C.; White, R. J.; Zweerink, J.

    2005-02-01

    The prototype for the VERITAS imaging atmospheric Cherenkov telescope array was successfully operated in southern Arizona between September 2003 and April 2004. The prototype consisted of 86 mirror facets mounted centrally on a 12-meter dish, which was built to accommodate up to 350 facets when converted to a complete VERITAS telescope. The camera consisted of half of the full 499 pixel camera. The signal and trigger electronics were nearly identical to those that will be used for the individual VERITAS array telescopes. By observing the Crab and Mrk421, as well as performing a variety of tests, the characteristics of the instrument were evaluated. The prototype met all performance expectations and served as a valuable test bed for the current design, as well as for the construction and operation of VERITAS. This prototype instrument is now being upgraded to a complete VERITAS telescope that will be operated during the construction of the full VERITAS array. The array is expected to be operational by November 2006.

  6. Large-Scale Spray Releases: Additional Aerosol Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Daniel, Richard C.; Gauglitz, Phillip A.; Burns, Carolyn A.; Fountain, Matthew S.; Shimskey, Rick W.; Billing, Justin M.; Bontha, Jagannadha R.; Kurath, Dean E.; Jenks, Jeromy WJ; MacFarlan, Paul J.; Mahoney, Lenna A.

    2013-08-01

    One of the events postulated in the hazard analysis for the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak event involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids that behave as a Newtonian fluid. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and in processing facilities across the DOE complex. To expand the data set upon which the WTP accident and safety analyses were based, an aerosol spray leak testing program was conducted by Pacific Northwest National Laboratory (PNNL). PNNL’s test program addressed two key technical areas to improve the WTP methodology (Larson and Allen 2010). The first technical area was to quantify the role of slurry particles in small breaches where slurry particles may plug the hole and prevent high-pressure sprays. The results from an effort to address this first technical area can be found in Mahoney et al. (2012a). The second technical area was to determine aerosol droplet size distribution and total droplet volume from prototypic breaches and fluids, including sprays from larger breaches and sprays of slurries for which literature data are mostly absent. To address the second technical area, the testing program collected aerosol generation data at two scales, commonly referred to as small-scale and large-scale testing. The small-scale testing and resultant data are described in Mahoney et al. (2012b), and the large-scale testing and resultant data are presented in Schonewill et al. (2012). In tests at both scales, simulants were used

  7. Deep sea tests of a prototype of the KM3NeT digital optical module

    Science.gov (United States)

    Adrián-Martínez, S.; Ageron, M.; Aharonian, F.; Aiello, S.; Albert, A.; Ameli, F.; Anassontzis, E. G.; Anghinolfi, M.; Anton, G.; Anvar, S.; Ardid, M.; de Asmundis, R.; Balasi, K.; Band, H.; Barbarino, G.; Barbarito, E.; Barbato, F.; Baret, B.; Baron, S.; Belias, A.; Berbee, E.; van den Berg, A. M.; Berkien, A.; Bertin, V.; Beurthey, S.; van Beveren, V.; Beverini, N.; Biagi, S.; Bianucci, S.; Billault, M.; Birbas, A.; Boer Rookhuizen, H.; Bormuth, R.; Bouché, V.; Bouhadef, B.; Bourlis, G.; Bouwhuis, M.; Bozza, C.; Bruijn, R.; Brunner, J.; Cacopardo, G.; Caillat, L.; Calamai, M.; Calvo, D.; Capone, A.; Caramete, L.; Caruso, F.; Cecchini, S.; Ceres, A.; Cereseto, R.; Champion, C.; Château, F.; Chiarusi, T.; Christopoulou, B.; Circella, M.; Classen, L.; Cocimano, R.; Colonges, S.; Coniglione, R.; Cosquer, A.; Costa, M.; Coyle, P.; Creusot, A.; Curtil, C.; Cuttone, G.; D'Amato, C.; D'Amico, A.; De Bonis, G.; De Rosa, G.; Deniskina, N.; Destelle, J.-J.; Distefano, C.; Donzaud, C.; Dornic, D.; Dorosti-Hasankiadeh, Q.; Drakopoulou, E.; Drouhin, D.; Drury, L.; Durand, D.; Eberl, T.; Eleftheriadis, C.; Elsaesser, D.; Enzenhöfer, A.; Fermani, P.; Fusco, L. A.; Gajana, D.; Gal, T.; Galatà, S.; Gallo, F.; Garufi, F.; Gebyehu, M.; Giordano, V.; Gizani, N.; Gracia Ruiz, R.; Graf, K.; Grasso, R.; Grella, G.; Grmek, A.; Habel, R.; van Haren, H.; Heid, T.; Heijboer, A.; Heine, E.; Henry, S.; Hernández-Rey, J. J.; Herold, B.; Hevinga, M. A.; van der Hoek, M.; Hofestädt, J.; Hogenbirk, J.; Hugon, C.; Hößl, J.; Imbesi, M.; James, C.; Jansweijer, P.; Jochum, J.; de Jong, M.; Kadler, M.; Kalekin, O.; Kappes, A.; Kappos, E.; Katz, U.; Kavatsyuk, O.; Keller, P.; Kieft, G.; Koffeman, E.; Kok, H.; Kooijman, P.; Koopstra, J.; Korporaal, A.; Kouchner, A.; Koutsoukos, S.; Kreykenbohm, I.; Kulikovskiy, V.; Lahmann, R.; Lamare, P.; Larosa, G.; Lattuada, D.; Le Provost, H.; Leisos, A.; Lenis, D.; Leonora, E.; Lindsey Clark, M.; Liolios, A.; Llorens Alvarez, C. D.; Löhner, H.; Lo Presti, D.; Louis, F.; Maccioni, E.; Mannheim, K.; Manolopoulos, K.; Margiotta, A.; Mariş, O.; Markou, C.; Martínez-Mora, J. A.; Martini, A.; Masullo, R.; Michael, T.; Migliozzi, P.; Migneco, E.; Miraglia, A.; Mollo, C.; Mongelli, M.; Morganti, M.; Mos, S.; Moudden, Y.; Musico, P.; Musumeci, M.; Nicolaou, C.; Nicolau, C. A.; Orlando, A.; Orzelli, A.; Papageorgiou, K.; Papaikonomou, A.; Papaleo, R.; Păvălaş, G. E.; Peek, H.; Pellegrino, C.; Pellegriti, M. G.; Perrina, C.; Petridou, C.; Piattelli, P.; Pikounis, K.; Popa, V.; Pradier, Th.; Priede, M.; Pühlhofer, G.; Pulvirenti, S.; Racca, C.; Raffaelli, F.; Randazzo, N.; Rapidis, P. A.; Razis, P.; Real, D.; Resvanis, L.; Reubelt, J.; Riccobene, G.; Rovelli, A.; Royon, J.; Saldaña, M.; Samtleben, D. F. E.; Sanguineti, M.; Santangelo, A.; Sapienza, P.; Savvidis, I.; Schmelling, J.; Schnabel, J.; Sedita, M.; Seitz, T.; Sgura, I.; Simeone, F.; Siotis, I.; Sipala, V.; Solazzo, M.; Spitaleri, A.; Spurio, M.; Stavropoulos, G.; Steijger, J.; Stolarczyk, T.; Stransky, D.; Taiuti, M.; Terreni, G.; Tézier, D.; Théraube, S.; Thompson, L. F.; Timmer, P.; Trapierakis, H. I.; Trasatti, L.; Trovato, A.; Tselengidou, M.; Tsirigotis, A.; Tzamarias, S.; Tzamariudaki, E.; Vallage, B.; Van Elewyck, V.; Vermeulen, J.; Vernin, P.; Viola, S.; Vivolo, D.; Werneke, P.; Wiggers, L.; Wilms, J.; de Wolf, E.; van Wooning, R. H. L.; Yatkin, K.; Zachariadou, K.; Zonca, E.; Zornoza, J. D.; Zúñiga, J.; Zwart, A.

    2014-09-01

    The first prototype of a photo-detection unit of the future KM3NeT neutrino telescope has been deployed in the deep waters of the Mediterranean Sea. This digital optical module has a novel design with a very large photocathode area segmented by the use of 31 three inch photomultiplier tubes. It has been integrated in the ANTARES detector for in-situ testing and validation. This paper reports on the first months of data taking and rate measurements. The analysis results highlight the capabilities of the new module design in terms of background suppression and signal recognition. The directionality of the optical module enables the recognition of multiple Cherenkov photons from the same $^{40}$K decay and the localization bioluminescent activity in the neighbourhood. The single unit can cleanly identify atmospheric muons and provide sensitivity to the muon arrival directions.

  8. Deep sea tests of a prototype of the KM3NeT digital optical module

    International Nuclear Information System (INIS)

    Adrian-Martinez, S.; Ardid, M.; Llorens Alvarez, C.D.; Saldana, M.; Ageron, M.; Bertin, V.; Beurthey, S.; Billault, M.; Brunner, J.; Caillat, L.; Cosquer, A.; Coyle, P.; Curtil, C.; Destelle, J.J.; Dornic, D.; Gallo, F.; Henry, S.; Keller, P.; Lamare, P.; Royon, J.; Solazzo, M.; Tezier, D.; Theraube, S.; Yatkin, K.; Aharonian, F.; Drury, L.; Aiello, S.; Giordano, V.; Leonora, E.; Randazzo, N.; Sipala, V.; Albert, A.; Drouhin, D.; Racca, C.; Ameli, F.; De Bonis, G.; Nicolau, C.A.; Simeone, F.; Anassontzis, E.G.; Anghinolfi, M.; Cereseto, R.; Hugon, C.; Kulikovskiy, V.; Musico, P.; Orzelli, A.; Anton, G.; Classen, L.; Eberl, T.; Enzenhoefer, A.; Gal, T.; Graf, K.; Heid, T.; Herold, B.; Hofestaedt, J.; Hoessl, J.; James, C.; Kalekin, O.; Kappes, A.; Katz, U.; Lahmann, R.; Reubelt, J.; Schnabel, J.; Seitz, T.; Stransky, D.; Tselengidou, M.; Anvar, S.; Chateau, F.; Durand, D.; Le Provost, H.; Louis, F.; Moudden, Y.; Zonca, E.; Asmundis, R. de; Deniskina, N.; Migliozzi, P.; Mollo, C.; Balasi, K.; Drakopoulou, E.; Markou, C.; Pikounis, K.; Siotis, I.; Stavropoulos, G.; Tzamariudaki, E.; Band, H.; Berbee, E.; Berkien, A.; Beveren, V. van; Boer Rookhuizen, H.; Bouwhuis, M.; Gajana, D.; Gebyehu, M.; Heijboer, A.; Heine, E.; Hoek, M. van der; Hogenbirk, J.; Jansweijer, P.; Kieft, G.; Kok, H.; Koopstra, J.; Korporaal, A.; Michael, T.; Mos, S.; Peek, H.; Schmelling, J.; Steijger, J.; Timmer, P.; Vermeulen, J.; Werneke, P.; Wiggers, L.; Zwart, A.; Barbarino, G.; Barbato, F.; De Rosa, G.; Garufi, F.; Vivolo, D.; Barbarito, E.; Ceres, A.; Circella, M.; Mongelli, M.; Sgura, I.; Baret, B.; Baron, S.; Champion, C.; Colonges, S.; Creusot, A.; Galata, S.; Gracia Ruiz, R.; Kouchner, A.; Lindsey Clark, M.; Van Elewyck, V.; Belias, A.; Rapidis, P.A.; Trapierakis, H.I.; Berg, A.M. van den; Dorosti-Hasankiadeh, Q.; Hevinga, M.A.; Kavatsyuk, O.; Loehner, H.; Wooning, R.H.L. van; Beverini, N.; Biagi, S.; Cecchini, S.; Fusco, L.A.; Margiotta, A.; Spurio, M.; Bianucci, S.; Bouhadef, B.; Calamai, M.; Morganti, M.; Raffaelli, F.; Terreni, G.; Birbas, A.; Bourlis, G.; Christopoulou, B.; Gizani, N.; Leisos, A.; Lenis, D.; Tsirigotis, A.; Tzamarias, S.; Bormuth, R.; Jong, M. de; Samtleben, D.F.E.; Bouche, V.; Fermani, P.; Masullo, R.; Perrina, C.; Bozza, C.; Grella, G.; Bruijn, R.; Koffeman, E.; Wolf, E. de; Cacopardo, G.; Caruso, F.; Cocimano, R.; Coniglione, R.; Costa, M.; Cuttone, G.; D'Amato, C.; D'Amico, A.; Distefano, C.; Grasso, R.; Grmek, A.; Imbesi, M.; Larosa, G.; Lattuada, D.; Migneco, E.; Miraglia, A.; Musumeci, M.; Orlando, A.; Papaleo, R.; Pellegrino, C.; Pellegriti, M.G.; Piattelli, P.

    2014-01-01

    The first prototype of a photo-detection unit of the future KM3NeT neutrino telescope has been deployed in the deep waters of the Mediterranean Sea. This digital optical module has a novel design with a very large photocathode area segmented by the use of 31 three inch photomultiplier tubes. It has been integrated in the ANTARES detector for in-situ testing and validation. This paper reports on the first months of data taking and rate measurements. The analysis results highlight the capabilities of the new module design in terms of background suppression and signal recognition. The directionality of the optical module enables the recognition of multiple Cherenkov photons from the same 40 K decay and the localisation of bioluminescent activity in the neighbourhood. The single unit can cleanly identify atmospheric muons and provide sensitivity to the muon arrival directions. (orig.)

  9. A Standard Mammography Unit - Standard 3D Ultrasound Probe Fusion Prototype: First Results.

    Science.gov (United States)

    Schulz-Wendtland, Rüdiger; Jud, Sebastian M; Fasching, Peter A; Hartmann, Arndt; Radicke, Marcus; Rauh, Claudia; Uder, Michael; Wunderle, Marius; Gass, Paul; Langemann, Hanna; Beckmann, Matthias W; Emons, Julius

    2017-06-01

    The combination of different imaging modalities through the use of fusion devices promises significant diagnostic improvement for breast pathology. The aim of this study was to evaluate image quality and clinical feasibility of a prototype fusion device (fusion prototype) constructed from a standard tomosynthesis mammography unit and a standard 3D ultrasound probe using a new method of breast compression. Imaging was performed on 5 mastectomy specimens from patients with confirmed DCIS or invasive carcinoma (BI-RADS ™ 6). For the preclinical fusion prototype an ABVS system ultrasound probe from an Acuson S2000 was integrated into a MAMMOMAT Inspiration (both Siemens Healthcare Ltd) and, with the aid of a newly developed compression plate, digital mammogram and automated 3D ultrasound images were obtained. The quality of digital mammogram images produced by the fusion prototype was comparable to those produced using conventional compression. The newly developed compression plate did not influence the applied x-ray dose. The method was not more labour intensive or time-consuming than conventional mammography. From the technical perspective, fusion of the two modalities was achievable. In this study, using only a few mastectomy specimens, the fusion of an automated 3D ultrasound machine with a standard mammography unit delivered images of comparable quality to conventional mammography. The device allows simultaneous ultrasound - the second important imaging modality in complementary breast diagnostics - without increasing examination time or requiring additional staff.

  10. First results from a beam test of a high-granularity silicon-based calorimeter for CMS at HL-LHC

    CERN Document Server

    Chatterjee, Rajdeep Mohan

    2016-01-01

    A prototype of the electromagnetic calorimeter for the CMS High Granularity Calorimeter that is being designed for the High Luminosity LHC (HL-LHC) was tested in a test beam at the Fermilab Test Beam Facility (FTBF). The detector consisted of 16 sampling layers of silicon sensors interspersed withtungsten plates for a total thickness of 15.3 X$_{0}$. Each of the hexagonal sensors were sub-divided into 128 cells, predominantly hexagonal in shape, of area ~1.1 cm$^2$. The analog signal from the 2048 cells was readout using the 64-channel SKIROC2 ASIC, developed by the LLR OMEGA group for the CALICE collaboration. Data were collected with a custom data acquisition system developed for these tests. The detector was calibrated using signals obtained with 120 GeV protons.We report here the design of the prototype detector and the results obtained from analyzing the data collected in July 2016, with electron beams at energies ranging from 4 to 32 GeV.

  11. Evaluation of Fermi read-out of the Atlas Tilecal prototype

    International Nuclear Information System (INIS)

    Ajaltouni, Z.; Alifanov, A.

    1998-01-01

    Prototypes of the FERMI system have been used to read out a prototype of the ATLAS hadron calorimeter in a beam test at the CERN SPS. The FERMI read-out system, using a compressor and a sampling ADC, is compared to a standard charge integrating read-out by measuring the energy resolution of the calorimeter separately with the two systems on the same events. Signal processing techniques have been designed to optimize the treatment of FERMI data. The resulting energy resolution is better than the one obtained with the standard read-out. (orig.)

  12. Initial tests of a prototype MRI-compatible PET imager

    Energy Technology Data Exchange (ETDEWEB)

    Raylman, Raymond R. [Center for Advanced Imaging, Department of Radiology, West Virginia University, HSB Box 9236, Morgantown, WV (United States)]. E-mail: rraylman@wvu.edu; Majewski, Stan [Detector Group, Physics Division, Thomas Jefferson National Accelerator Facility, Newport News, VA (United States); Lemieux, Susan [Center for Advanced Imaging, Department of Radiology, West Virginia University, HSB Box 9236, Morgantown, WV (United States); Velan, S. Sendhil [Center for Advanced Imaging, Department of Radiology, West Virginia University, HSB Box 9236, Morgantown, WV (United States); Kross, Brain [Detector Group, Physics Division, Thomas Jefferson National Accelerator Facility, Newport News, VA (United States); Popov, Vladimir [Detector Group, Physics Division, Thomas Jefferson National Accelerator Facility, Newport News, VA (United States); Smith, Mark F. [Detector Group, Physics Division, Thomas Jefferson National Accelerator Facility, Newport News, VA (United States); Weisenberger, Andrew G. [Detector Group, Physics Division, Thomas Jefferson National Accelerator Facility, Newport News, VA (United States); Wojcik, Randy [Detector Group, Physics Division, Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)

    2006-12-20

    Multi-modality imaging is rapidly becoming a valuable tool in the diagnosis of disease and in the development of new drugs. Functional images produced with PET fused with anatomical structure images created by MRI, will allow the correlation of form with function. Our group (a collaboration of West Virginia University and Jefferson Lab) is developing a system to acquire MRI and PET images contemporaneously. The prototype device consists of two opposed detector heads, operating in coincidence mode with an active FOV of 5x5x4 cm{sup 3}. Each MRI-PET detector module consists of an array of LSO detector elements (2.5x2.5x15 mm{sup 3}) coupled through a long fiber optic light guide to a single Hamamatsu flat panel PSPMT. The fiber optic light guide is made of a glued assembly of 2 mm diameter acrylic fibers with a total length of 2.5 m. The use of a light guides allows the PSPMTs to be positioned outside the bore of the 3 T General Electric MRI scanner used in the tests. Photon attenuation in the light guides resulted in an energy resolution of {approx}60% FWHM, interaction of the magnetic field with PSPMT further reduced energy resolution to {approx}85% FWHM. Despite this effect, excellent multi-plane PET and MRI images of a simple disk phantom were acquired simultaneously. Future work includes improved light guides, optimized magnetic shielding for the PSPMTs, construction of specialized coils to permit high-resolution MRI imaging, and use of the system to perform simultaneous PET and MRI or MR-spectroscopy.

  13. Prototype Effect and the Persuasiveness of Generalizations.

    Science.gov (United States)

    Dahlman, Christian; Sarwar, Farhan; Bååth, Rasmus; Wahlberg, Lena; Sikström, Sverker

    An argument that makes use of a generalization activates the prototype for the category used in the generalization. We conducted two experiments that investigated how the activation of the prototype affects the persuasiveness of the argument. The results of the experiments suggest that the features of the prototype overshadow and partly overwrite the actual facts of the case. The case is, to some extent, judged as if it had the features of the prototype instead of the features it actually has. This prototype effect increases the persuasiveness of the argument in situations where the audience finds the judgment more warranted for the prototype than for the actual case (positive prototype effect), but decreases persuasiveness in situations where the audience finds the judgment less warranted for the prototype than for the actual case (negative prototype effect).

  14. Design and test of a prototype silicon detector module for ATLAS Semiconductor Tracker endcaps

    International Nuclear Information System (INIS)

    Clark, A.G.; Donega, M.; D'Onofrio, M.

    2005-01-01

    The ATLAS Semiconductor Tracker (SCT) will be a central part of the tracking system of the ATLAS experiment. The SCT consists of four concentric barrels of silicon detectors as well as two silicon endcap detectors formed by nine disks each. The layout of the forward silicon detector module presented in this paper is based on the approved layout of the silicon detectors of the SCT, their geometry and arrangement in disks, but uses otherwise components identical to the barrel modules of the SCT. The module layout is optimized for excellent thermal management and electrical performance, while keeping the assembly simple and adequate for a large scale module production. This paper summarizes the design and layout of the module and present results of a limited prototype production, which has been extensively tested in the laboratory and testbeam. The module design was not finally adopted for series production because a dedicated forward hybrid layout was pursued

  15. PRMS Data Warehousing Prototype

    Science.gov (United States)

    Guruvadoo, Eranna K.

    2002-01-01

    Project and Resource Management System (PRMS) is a web-based, mid-level management tool developed at KSC to provide a unified enterprise framework for Project and Mission management. The addition of a data warehouse as a strategic component to the PRMS is investigated through the analysis, design and implementation processes of a data warehouse prototype. As a proof of concept, a demonstration of the prototype with its OLAP's technology for multidimensional data analysis is made. The results of the data analysis and the design constraints are discussed. The prototype can be used to motivate interest and support for an operational data warehouse.

  16. Development and test of a cryocatcher-prototype for the control of the dynamic vacuum in SIS100

    International Nuclear Information System (INIS)

    Bozyk, Lars

    2012-01-01

    In the FAIR project (Facility for Antiproton and Ion Research) at the GSI Helmholtz Centre for Heavy Ion Research GmbH, high intensity heavy ion beams will be provided by the superconducting synchrotron SIS100. Medium charge state ions will be used instead of high charge state ions. The medium charge state ions on the one hand shift the space charge limit towards higher intensities and, on the other hand, avoid intensity losses in stripper stages. The most demanding challenges in the operation with medium charge state heavy ions are beam losses due to charge exchange in collisions with residual gas molecules. Further ionized ions are separated from the circulating beam and get lost on the chamber wall, while releasing a big amount of gas via ion stimulated desorption. The local pressure rise increases the probability for further charge exchange of beam ions, and a self-amplification can evolve. This process may result in a complete beam loss. One way to damp this amplification is given by the installation of ion-catchers or collimators, which ensure perpendicular loss on special low desorbing surfaces at the positions of beam loss. The ion optical lattice of the SIS100 of the FAIR accelerator complex has been optimized for the usage of collimators. Almost 100% of the ionization losses can be caught by the ion-catcher system. In the arcs of the synchrotron, a total of 60 ion-catchers is located between the superconducting quadrupoles in a cryogenic environment. This thesis adresses the development, the construction, and the test of a cryocatcher prototype. In SIS18, an ion-catcher system has been installed successfully. In this work it is compared to the ion-catcher system of SIS100, and different measurements with the existing system are presented. Based on the requirements for the new system, the collimator block and its support structure, as well as the surrounding cryogenic, copper plated vacuum chamber is described. The cold surface of the vacuum chamber acts

  17. Cosmic ray test results of the DO prototype scintillating fiber tracker

    International Nuclear Information System (INIS)

    Adams, D.; Bertram, I.; Adams, M.; Chung, M.; Baumbaugh, B.; Bross, A.; Casey, D.; Cretsinger, C.; Chang, S.; Cooper, C.

    1995-01-01

    The performance of a large scale scintillating fiber tracker with VLPC readout has been studied in a cosmic-ray test. Approximately 9.6 photoelectrons per single layer per trigger were detected at a VLPC bias voltage of 6.5V. The doublet efficiency was nearly 100% at a 0.1% noise level and a position resolution of about 140μm was measured. The authors also studied the relationship between VLPC performance and VLPC bias voltage by measuring single fiber efficiency as a function of VLPC bias in the range 6.2V to 7.0V at a fixed temperature of 6.5 degrees K. They observed no significant variation in VLPC performance within this bias range

  18. Cosmic ray test results of the DOe prototype scintillating fiber tracker

    Energy Technology Data Exchange (ETDEWEB)

    Adams, D. [Rice Univ., Houston, TX (United States); Adams, M. [University of Illinois at Chicago, IL (United States); Baumbaugh, B. [Notre Dame Univ., IN (United States); Bertram, I. [Rice Univ., Houston, TX (United States); Bross, A. [Fermi National Accelerator Lab., Batavia, IL (United States); Casey, D. [Rochester Univ., NY (United States); Chang, S. [Northeastern Univ., Boston, MA (United States); Chung, M. [University of Illinois at Chicago, IL (United States); Cooper, C. [Purdue Univ., Lafayette, IN (United States); Cretsinger, C. [Rochester Univ., NY (United States); Demina, R. [Northeastern Univ., Boston, MA (United States); Fanourakis, G. [Rochester Univ., NY (United States); Gruenendahl, S. [Rochester Univ., NY (United States); Hinson, J. [Purdue Univ., Lafayette, IN (United States); Howell, B. [Purdue Univ., Lafayette, IN (United States); Johari, H. [Northeastern Univ., Boston, MA (United States); Kang, J.S. [Korea Univ., Seoul (Korea, Republic of); Kim, C.L. [Korea Univ., Seoul (Korea, Republic of); Kim, S.K. [Seoul National Univ. (Korea, Republic of); Koltick, D. [Purdue Univ., Lafayette, IN (United States); Lobkowicz, F. [Rochester Univ., NY (United States); Margulies, S. [University of Illinois at Chicago, IL (United States); Moromisato, J. [Northeastern Univ., Boston, MA (United States); Narain, M. [Fermi National Accelerator Lab., Batavia, IL (United States); Park, C.H. [Fermi National Accelerator Lab., Batavia, IL (United States); Park, Y.M. [Kyungsung Univ., Pusan (Korea, Republic of); Reucroft, S. [Northeastern Univ., Boston, MA (United States); Ruchti, R. [Notre Dame Univ., IN (United States); Solomon, J. [University of Illinois at Chicago, IL (United States); VonGoeler, E. [Northeastern Univ., Boston, MA (United States); Warchol, J. [Notre Dame Univ., IN (United States); Wayne, M. [Notre Dame Univ., IN (United States); Won, E. [Rochester Univ., NY (United States); Yu, Y. [Seoul National Univ. (Korea)

    1995-11-01

    The performance of a large scale scintillating fiber tracker with VLPC readout has been studied in a cosmic-ray test. Approximately 9.6 photoelectrons per single layer per trigger were detected at a VLPC bias voltage of 6.5V. The doublet efficiency was nearly 100% at a 0.1% noise level and a position resolution of about 140{mu}m was measured. We also studied the relationship between VLPC performance and VLPC bias voltage by measuring single fiber efficiency as a function of VLPC bias in the range 6.2V to 7.0V at a fixed temperature of 6.5K. We observed no significant variation in VLPC performance within this bias range. (orig.).

  19. Small-Scale Spray Releases: Additional Aerosol Test Results

    Energy Technology Data Exchange (ETDEWEB)

    Schonewill, Philip P.; Gauglitz, Phillip A.; Kimura, Marcia L.; Brown, G. N.; Mahoney, Lenna A.; Tran, Diana N.; Burns, Carolyn A.; Kurath, Dean E.

    2013-08-01

    One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. To expand the data set upon which the WTP accident and safety analyses were based, an aerosol spray leak testing program was conducted by Pacific Northwest National Laboratory (PNNL). PNNL’s test program addressed two key technical areas to improve the WTP methodology (Larson and Allen 2010). The first technical area was to quantify the role of slurry particles in small breaches where slurry particles may plug the hole and prevent high-pressure sprays. The results from an effort to address this first technical area can be found in Mahoney et al. (2012a). The second technical area was to determine aerosol droplet size distribution and total droplet volume from prototypic breaches and fluids, including sprays from larger breaches and sprays of slurries for which literature data are largely absent. To address the second technical area, the testing program collected aerosol generation data at two scales, commonly referred to as small-scale and large-scale. The small-scale testing and resultant data are described in Mahoney et al. (2012b) and the large-scale testing and resultant data are presented in Schonewill et al. (2012). In tests at both scales, simulants were used to mimic the

  20. Process Testing Results and Scaling for the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Engineering Platform - 10173

    International Nuclear Information System (INIS)

    Kurath, Dean E.; Daniel, Richard C.; Baldwin, David L.; Rapko, Brian M.; Barnes, Steven M.; Gilbert, Robert A.; Mahoney, Lenna A.; Huckaby, James L.

    2010-01-01

    The U.S. Department of Energy-Office of River Protections Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanfords 177 underground waste storage tanks at Richland, Washington. In support of this effort, engineering-scale tests at the Pretreatment Engineering Platform (PEP) have been completed to confirm the process design and provide improved projections of system capacity. The PEP is a 1/4.5-scale facility designed, constructed, and operated to test the integrated leaching and ultrafiltration processes being deployed at the WTP. The PEP replicates the WTP leaching processes with prototypic equipment and control strategies and non-prototypic ancillary equipment to support the core processing. The testing approach used a nonradioactive aqueous slurry simulant to demonstrate the unit operations of caustic and oxidative leaching, cross-flow ultrafiltration solids concentration, and solids washing. Parallel tests conducted at the laboratory scale with identical simulants provided results that allow scale-up factors to be developed between the laboratory and PEP performance. This paper presents the scale-up factors determined between the laboratory and engineering-scale results and presents arguments that extend these results to the full-scale process.