  1. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  2. Caribbean alternative energy programme project proposals

    International Nuclear Information System (INIS)

    1978-03-01

    This is the third report to follow the Project Group Meeting on ALTERNATIVE ENERGY RESOURCES, Barbados, September, 1977. It consists of summaries of projects proposals identified at the Meeting. The first two reports have been previously circulated. The first CSC(77)AER-1 covers the background, proceedings and recommendations resulting from the meeting as well as containing a brief outline of the project proposals. The country papers and technical papers that were presented at the meeting or served as background material, form the second report, CSC(77)AER-2. Copies of the first two reports can be obtained on request to the Commonwealth Science Council. Projects with potential for making significant progress in the short term have been marked with an asterisk

  3. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  4. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...

  5. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  6. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  7. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  8. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  9. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  10. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  11. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Science.gov (United States)

    2010-01-01

    ... time on submitted proposals until comparisons can be made with other existing projects or with project... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements...

  12. Power demand operation - environment and potential. Proposals for main project

    International Nuclear Information System (INIS)

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  13. A Proposal to Build an Education Research and Development Program: The Kamehameha Early Education Project Proposal. Technical Report #3.

    Science.gov (United States)

    Gallimore, Ronald; And Others

    This report summarizes the programmatic features of a proposal for the Kamehameha Early Education Project (KEEP), a program aimed at the development, demonstration, and dissemination of methods for improving the education of Hawaiian and part-Hawaiian children. A brief description of the proposed project goals, structure, organization, and…

  14. 78 FR 39829 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...: Title: Reporting of Nonpayroll Withheld Tax Liabilities. OMB Number: 1545-1413. Regulation Project...

  15. 78 FR 39830 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... the Ozone Layer and on Products Containing Such Chemicals. OMB Number: 1545-1153. Regulation Project...

  16. 78 FR 70100 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-22

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Nuclear Power Plant. OMB Number: 1545-1378. Regulation Project Number: TD 8580. Abstract: This regulation...

  17. 78 FR 76893 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments.... Regulation Project Number: REG-209626-93 (TD 8796). Abstract: These regulations provide guidance concerning...

  18. 78 FR 45614 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-29

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... GST Deemed Allocations. OMB Number: 1545-1892. Regulation Project Number: REG-153841-02 (TD 9208...

  19. 75 FR 2930 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-106446-98] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... From Joint and Several Liability. OMB Number: 1545-1719. Regulation Project Number: REG-106446-98...

  20. 76 FR 6153 - Supplemental Environmental Impact Statement for the Proposed Campo Regional Landfill Project on...

    Science.gov (United States)

    2011-02-03

    ... for the Proposed Campo Regional Landfill Project on the Campo Indian Reservation, San Diego County, CA... proposed Campo Regional Landfill Project (Proposed Action) to be located on the Campo Indian Reservation... Landfill Project (Proposed Action). There is no Federal action of amended lease and amended sublease...

  1. 75 FR 2932 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-116664-01] RIN 1545-BC15 Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION.... OMB Number: 1545-1868. Regulation Project Number: REG-116664-01 (TD 9300 (final)). Abstract: This...

  2. 78 FR 76892 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Liabilities for Pension Funding Purposes. OMB Number: 1545-2095. Regulation Project Number: REG-139236-07 (TD...

  3. 76 FR 74117 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-30

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Number: 1545-0817. Regulation Project Number: EE-28-78 (TD 7845). Abstract: Internal Revenue Code section...

  4. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  5. 78 FR 66424 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [IA-33-92] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... Project Number: IA-33-92. Abstract: Section 6050H of the Internal Revenue Code relates to the information...

  6. 78 FR 66423 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [TD 9057, TD 9154, TD 9187] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Rules. OMB Number: 1545-1774. Regulation Project Number: TD 9057, TD 9154, and TD 9187. Abstract: The...

  7. Proposed Casey's Pond Improvement Project, Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), evaluating the impacts associated with the proposed Casey's Pond Improvement Project at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The improvement project would maximize the efficiency of the Fermilab Industrial Cooling Water (ICW) distribution system, which removes (via evaporation) the thermal load from experimental and other support equipment supporting the high energy physics program at Fermilab. The project would eliminate the risk of overheating during fixed target experiments, ensure that the Illinois Water Quality Standards are consistently achieved and provide needed additional water storage for fire protection. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required

  8. Proposal for the further development of the 'Ribeira Grande' agricultural geothermal project

    International Nuclear Information System (INIS)

    Popovski, Kiril; De Medeiros, Jorge Rosa; Rodrigues, Ana Catarina Tavares

    2000-01-01

    Geothermal project Ribeira Grande has been the first trial to introduce the possibilities of direct application of geothermal energy at Azores. As all the first experiences, it's development has been escorted with a list of difficulties and problems, resulting with non proper completion of some systems and installations. However, even not complete, the reached results justified both technically and economically the indigenous resource door for further activities and development. Presented proposal for the second phase of project development consists two very important advantages: 1) Enables development of new demonstration and productive projects, without engaging new import of fuels or other energents; 2) Enables development based on the already existing economy sectors at the islands and makes them more profitable and accommodated to the requests of the national and international market. However, influencing national and international preconditions for the realization of the proposed activities are not very convenient and are requesting a concentrate engagement of the Institute for Innovative Technologies of Azores INOVA during the period of next 5 years. The final success of this engagement shall open very wide possibilities for direct application of geothermal energy development in this isolated EC community, presently mainly orientated towards import both of energy and food. (Authors)

  9. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  10. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  11. Developing an online support tool to assist students in higher education with project proposals

    OpenAIRE

    Haji Suhaili, Wida Susanty

    2015-01-01

    The research presented in this thesis investigates ways to assist students with writing their project proposals. There is limited literature on the problems students have when writing project proposals in Higher Education. Particularly most of the literature has concentrated on the writing aspects, rhetorical aspects and structure of a scientific article. Even though various studies on assessment of undergraduate individual and group project works have been done, the project pr...

  12. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  13. 76 FR 55155 - Final Environmental Impact Statement for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ... border of the U.S. and Canada for the transport of crude oil across the U.S./Canada international... proposed Project that is designed to transport crude oil produced from oil sands in the Western Canadian... security; environmental, cultural, and economic impacts. Before making a decision on the proposed Project...

  14. Proposed REDD+ project for the Sundarbans: Legal and institutional issues

    Directory of Open Access Journals (Sweden)

    Saiful Karim

    2013-07-01

    Full Text Available Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM Sundarbans Project’ (CRISP to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

  15. Return on Scientific Investment - RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management.

    Science.gov (United States)

    Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson

    2012-01-01

    To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  16. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  17. 77 FR 6624 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-02-08

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  18. 76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-06-20

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  19. 76 FR 60963 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-09-30

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... the public transportation projects listed below. The actions on these projects, as well as the laws...

  20. 76 FR 19522 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-04-07

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... herein for the listed public transportation projects will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  1. 76 FR 72746 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-11-25

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before May... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  2. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  3. 76 FR 25773 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-05-05

    ... Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice of... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation project listed below. The actions on this project, as well as the...

  4. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  5. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation projects listed below. The actions on these projects, as well as the laws under...

  6. 76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-18

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...

  7. 75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-03-19

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  8. 77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-01-04

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  9. 75 FR 71181 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-11-22

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... issuing certain approvals for the public transportation projects listed below. The actions on these...

  10. STRATEGIC MAPS AND CRITICAL FACTORS FOR PROJECT MANAGEMENT MATURITY: A PROPOSAL

    Directory of Open Access Journals (Sweden)

    Sady Darcy Silva Junior

    2010-06-01

    Full Text Available Project Management (PM and Strategic Management (SM are two subjects of growing importance in the corporate environment which are normally considered in isolation. One way of integrating these two concepts might be via the concept of project management maturity (Westphal et al., 2008. Rabechini and Pessoa (2005 state that to obtain project management maturity, it is necessary to achieve success in a number of critical factors which include organizational culture and structure, as well as sponsorship at both tactical and strategic levels (Silva et al., 2008. Another way of achieving this connection is by using Balanced Scorecard (BSC as an auxiliary tool to integrate between projects and organizational strategy (Brock et al., 2003. The original developers of the BSC, Kaplan e Norton, subsequently developed the concept of strategy mapping, which they affirm "represents the missing link between the formulation and the execution of the strategy" (Kaplan e Norton, 2004. This paper proposes a strategy map identifying critical factors for attaining project management maturity. To formulate the map, we used a qualitative, exploratory approach oriented by Project Management theory and strategy mapping. We first identified 13 critical factors, then developed a strategy map, which was evaluated by six specialists (three in SM area and three in PM area.The results suggest links between strategic mapping nad critical factors in project management. It also contributes to both areas independently. Specifically, the study identifies critical factors for project management maturity while demonstrating the applicability of strategic mapping techniques to Balanced Scorecard concepts.

  11. Preliminary methodological proposal for estimating environmental flows in projects approved by the ministry of environment and sustainable development (MADS), Colombia

    International Nuclear Information System (INIS)

    Pinilla Agudelo, Gabriel A; Rodriguez Sandoval, Erasmo A; Camacho Botero, Luis A

    2014-01-01

    A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA) in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogota (UNC). The proposed method begins with an evaluation of hydrological criteria, continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macro invertebrates, riparian vegetation, and fish). The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS.

  12. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  13. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  14. Analytical results for Abelian projection

    International Nuclear Information System (INIS)

    Ogilivie, Michael C.

    1999-01-01

    Analytic methods for Abelian projection are developed, and a number of results related to string tension measurements are obtained. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The subgroup used for projection need only contain the center of the gauge group, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements

  15. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  16. 76 FR 43381 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-07-20

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Financial Asset Securitization Investment Trusts; Real Estate Mortgage Investment Conduits (TD 9004 (final...

  17. Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management

    Directory of Open Access Journals (Sweden)

    Cristofer André Caous

    2012-06-01

    Full Text Available Objective: To propose a measure (index of expected risks to evaluateand follow up the performance analysis of research projects involvingfinancial and adequate structure parameters for its development.Methods: A ranking of acceptable results regarding researchprojects with complex variables was used as an index to gauge aproject performance. In order to implement this method the ulcerindex as the basic model to accommodate the following variableswas applied: costs, high impact publication, fund raising, and patentregistry. The proposed structured analysis, named here as RoSI(Return on Scientific Investment comprises a pipeline of analysis tocharacterize the risk based on a modeling tool that comprises multiplevariables interacting in semi-quantitatively environments. Results:This method was tested with data from three different projects in ourInstitution (projects A, B and C. Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C related to development and expected results according to initial or full investment. Conclusion: The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  18. 78 FR 23975 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-23

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... definition of a controlled foreign corporation, foreign base company income and foreign personal holding...

  19. 75 FR 23798 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound...

    Science.gov (United States)

    2010-05-04

    ... Proposed Cape Wind Energy Project in Nantucket Sound, Offshore Massachusetts AGENCY: Minerals Management... Energy Project proposed for Nantucket Sound, offshore Massachusetts. On January 16, 2009, the MMS... construct a wind power facility on Horseshoe Shoal in Nantucket Sound, offshore Massachusetts. Following the...

  20. 78 FR 26694 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments. SUMMARY: The Department of the Treasury, as part of its continuing effort to reduce paperwork and...

  1. The Mediterranean Solar Plan: Project proposals for renewable energy in the Mediterranean Partner Countries region

    International Nuclear Information System (INIS)

    Jablonski, Sophie; Tarhini, Mohamad; Touati, Manaf; Gonzalez Garcia, David; Alario, Juan

    2012-01-01

    This paper presents a first assessment of the renewable energy projects, proposed by the nine Mediterranean Partner Countries (MPCs) under the Mediterranean Solar Plan (MSP) and the associated potential economic impacts. As one of the priority projects of the Union for the Mediterranean (UfM), the MSP's objective which attracted most attention until now is the intention to deploy an additional 20 GW of renewable electrical capacity in the Southern and Eastern Mediterranean region (covering the MPCs plus Turkey) by 2020. The main findings of this research are: (1) as of February 2010, a total of 10.3 GW of renewable project proposals were identified in the MPCs, corresponding to about half of the 20 GW target; (2) investment needs for the identified projects could amount to EUR 21 billion by 2020, which represents about five times the amount invested by the region in conventional electricity generation in the last decade; and (3) the difference between the cost of renewable electricity generation and the economic cost of its fossil fuel alternatives could amount to EUR 1.2 billion. Insights stemming from the results of this research can generate useful regional messages for energy policy leaders in the MPCs to accelerate the development of renewable energy projects. - Highlights: ► We conducted a systematic survey of renewable energy projects in the Mediterranean. ► The identified projects correspond to half the MSP 20 GW target. ► Maturity assessment is used to classify the advancement of the projects. ► We estimated the investment needs and required subsidies in the region by 2020.

  2. 75 FR 28331 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-05-20

    ... that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service [INTL-955-86] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and...

  3. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  4. 78 FR 28703 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-15

    ... requirements that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...

  5. 76 FR 4150 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation project will be barred unless the claim is filed on or before July 25, 2011. FOR...

  6. 76 FR 55470 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-09-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or...

  7. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Science.gov (United States)

    2010-06-24

    .... ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other Federal agencies... result of a tiered environmental review process under the National Environmental Policy Act, 42 U.S.C... judicial review of the Tier 1 Federal agency actions of the proposed highway and transit project will be...

  8. 75 FR 10500 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound, MA

    Science.gov (United States)

    2010-03-08

    ... Proposed Cape Wind Energy Project in Nantucket Sound, MA AGENCY: Minerals Management Service (MMS... MMS for the Cape Wind Energy Project proposed for Nantucket Sound, Massachusetts. On January 16, 2009... facility on Horseshoe Shoal in Nantucket Sound, Massachusetts. Following the adoption of the Energy Policy...

  9. 75 FR 37780 - Proposed Waivers and Extensions of Project Periods: Presidential Academies and Congressional...

    Science.gov (United States)

    2010-06-30

    ... the teaching of history. We seek this waiver and extension of project period in order to enable each... or the teaching of history. The Secretary certifies that the proposed waiver and extension of project... American History and Civics Education, and 34 CFR 75.261(c)(2), as it applies to the project funded under...

  10. The Proposal of Scaling the Roles in Scrum of Scrums for Distributed Large Projects

    OpenAIRE

    Abeer M. AlMutairi; M. Rizwan Jameel Qureshi

    2015-01-01

    Scrum of scrums is an approach used to scale the traditional Scrum methodology to fit for the development of complex and large projects. However, scaling the roles of scrum members brought new challenges especially in distributed and large software projects. This paper describes in details the roles of each scrum member in scrum of scrum to propose a solution to use a dedicated product owner for a team and inclusion of sub-backlog. The main goal of the proposed solution i...

  11. 78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  12. 78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-01-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  13. 78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-06-05

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  14. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  15. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  16. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  17. 76 FR 78332 - Amended Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Amended Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION... actions announced herein for the listed public transportation project will be barred unless the claim is...

  18. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  19. Preliminary results on the cryogenic target for FIREX project

    International Nuclear Information System (INIS)

    Iwamoto, A.; Maekawa, R.; Mito, T.; Okamoto, M.; Motojima, O.; Nakai, M.; Norimatsu, T.; Nagai, K.

    2006-01-01

    Preliminary tests on the cryogenic target for the fast ignition realization experiment (FIREX) project has been conducted. A foam shell method is proposed to realize its target design. A foam target consists of three parts: a foam shell, a conical laser guide and a liquid or gas feeder made of glass. The shell is a hollow sphere (500 μm in diameter) with a uniform and thin foam layer (about 20 μm in thickness). Epoxy resin is utilized to assemble the parts into the target. Liquid fuel is fed into the shell by the feeder and is soaked up by the foam material through capillarity. The fuel is then solidified. Regarding target fabrication, one of the concerns is the influence on various thermal contractions from the different materials when it is cooled down to cryogenic environment. This paper describes the result on the validity check at cryogenic environment and the demonstration of H 2 liquefaction using a dummy target instead of the foam target. Judging from these results, the target assembled in the same process as the dummy target is sure to be practicable for the FIREX project. (authors)

  20. Uses of geothermal energy in Jordan for heating greenhouses; project proposal

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.; Masarwah, Rober; Elkarmi, Fawwaz

    1993-08-01

    A proposal for the exploration of geothermal energy in Jordan for heating greenhouses. The report gives some background information on geothermal anomalies in Jordan, and outlines some on-going uses of geothermal energy in various parts of Jordan. The proposal is modelled on the 2664 square meter Filclair Super 9 Multispan greenhouse from France. The overall cost of the project involves three variables, the cost of the borehole, the cost of the greenhouse, and the cost of engineering services. The total cost ranges between three to four million dollars depending on the quantity and quality of information to be collected from the borehole. The advantages of geothermal heating compared with oil heating are emphasized. The project will enable geothermal heating and horticultural production to be monitored throughout the year, will produce data enabling rational and reliable water resources management, and will produce environmentally clean and efficient energy. (A.M.H.). 1 tab. 1 map

  1. AN EXCEL-BASED DECISION SUPPORT SYSTEM FOR SCORING AND RANKING PROPOSED R&D PROJECTS

    OpenAIRE

    ANNE DE PIANTE HENRIKSEN; SUSAN W. PALOCSAY

    2008-01-01

    One of the most challenging aspects of technology management is the selection of research and development (R&D) projects from among a group of proposals. This paper introduces an interactive, user-friendly decision support system for evaluating and ranking R&D projects and demonstrates its application on an example R&D program. It employs the scoring methodology developed by Henriksen and Traynor to provide a practical technique that considers both project merit and project cost in the evalua...

  2. Recent Results from NASA's Morphing Project

    Science.gov (United States)

    McGowan, Anna-Maria R.; Washburn, Anthony E.; Horta, Lucas G.; Bryant, Robert G.; Cox, David E.; Siochi, Emilie J.; Padula, Sharon L.; Holloway, Nancy M.

    2002-01-01

    The NASA Morphing Project seeks to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include macro, micro, structural and/or fluidic approaches. The project includes research on smart materials, adaptive structures, micro flow control, biomimetic concepts, optimization and controls. This paper presents an updated overview of the content of the Morphing Project including highlights of recent research results.

  3. 78 FR 26112 - Limitation on Claims Against Proposed Public Transportation Projects; Correction

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects; Correction AGENCY: Federal Transit Administration (FTA), DOT. ACTION... Register on April 22, 2013, concerning a limitation on claims for certain specified public transportation...

  4. Feasibility and potential effects of the proposed Amargosa Creek Recharge Project, Palmdale, California

    Science.gov (United States)

    Christensen, Allen H.; Siade, Adam J.; Martin, Peter; Langenheim, V.E.; Catchings, Rufus D.; Burgess, Matthew K.

    2015-09-17

    Historically, the city of Palmdale and vicinity have relied on groundwater as the primary source of water, owing, in large part, to the scarcity of surface water in the region. Despite recent importing of surface water, groundwater withdrawal for municipal, industrial, and agricultural use has resulted in groundwater-level declines near the city of Palmdale in excess of 200 feet since the early 1900s. To meet the growing water demand in the area, the city of Palmdale has proposed the Amargosa Creek Recharge Project (ACRP), which has a footprint of about 150 acres along the Amargosa Creek 2 miles west of Palmdale, California. The objective of this study was to evaluate the long-term feasibility of recharging the Antelope Valley aquifer system by using infiltration of imported surface water from the California State Water Project in percolation basins at the ACRP.

  5. Competitive strategy for the proposed Texas high speed rail project : a system dynamics/ CLIOS process approach.

    Science.gov (United States)

    2017-09-10

    The Texas High-Speed Rail (HSR) is an unprecedented US project proposed by a private company. This project has many uncertainties because it will be funded only by the private sectors and it is the first US HSR project using foreign technology. The H...

  6. A Proposal for a Mindset of a Project Manager

    DEFF Research Database (Denmark)

    Eriksson, Joakim; Hansen, Claus Thorp

    2008-01-01

    and clarification of decision situations and consequences is rarely used in practice and structured reasoning about project and product performance when making decisions is also rare. In order to enhance the project managers’ understanding of decision-making in product development projects, the objective......A company’s product strategy and its management of the product development process have been found to be key factors for a product’s success on the market [1]. Project managers of development projects need support to make process decisions and defining goals that are consistent with the business....... In product development projects it is desirable to reduce the level of uncertainty in order to make decisions without having to redo them later in the project resulting in longer lead time and higher costs. It is the project manager’s responsibility to manage this uncertainty in a complex ever...

  7. Far-infrared elastic scattering proposal for the Avogadro Project's silicon spheres

    Science.gov (United States)

    Humayun, Muhammad Hamza; Khan, Imran; Azeem, Farhan; Chaudhry, Muhammad Rehan; Gökay, Ulaş Sabahattin; Murib, Mohammed Sharif; Serpengüzel, Ali

    2018-05-01

    Avogadro constant determines the number of particles in one mole of a substance, thus relating the molar mass of the substance to the mass of this substance. Avogadro constant is related to Système Internationale base units by defining the very concept of chemical quantity. Revisions of the base units created a need to redefine the Avogadro constant, where a collaborative work called the Avogadro Project is established to employ optical interferometry to measure the diameter of high quality 100 mm silicon spheres. We propose far-infrared spectroscopy for determining the Avogadro constant by using elastic scattering from the 100 mm Avogadro Project silicon spheres. Similar spectroscopic methods are already in use in the near-infrared, relating whispering gallery modes of the 1 mm silicon spheres to the diameter of the spheres. We present numerical simulations in the far-infrared and the near-infrared, as well as spatially scaled down elastic scattering measurements in the near-infrared. These numerical and experimental results show that, the diameter measurements of 100 mm single crystal silicon spheres with elastic scattering in the far-infrared can be considered as an alternative to optical interferometry.

  8. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  9. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  10. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  11. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  12. The Formation of the Model of Diagnosing the Results Implementation of of Consulting Projects for Enterprises

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-11-01

    Full Text Available In the article the graphic-analytical model of diagnostics of results of implementation of consulting projects is formed, which allows to: take into consideration interests of participants to the project on choice of methods and methodologies of diagnosing; allocate alternative sets of business indicators for each object of impact in terms of consulting project; establish economic and non-economic criteria for evaluating the effectiveness of consulting, as well as monitoring of indicators and automated processing of diagnostic results to control deviations from the optimal values of the diagnosed project results. A structural-logical model of formation of alternative sets of indicators and choice of indicators for diagnostics of results of consulting projects has been developed. The elements of the enterprise management system have been codified to harmonize the corresponding indicators with their subsequent combination within the proposed sets. The control system objects and their elements have been allocated. The groups of indicators according to the technology of Balanced Score Card (BSC have been presented. The prospect of further research is the economic assessment of implementation of the diagnosed consulting projects, which will reveal the links between the parameters of production-economic activity and the assessment of projects, and allows choose the most significant ones.

  13. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Science.gov (United States)

    2013-01-31

    ..., Cambridge, MA 02142, Monday through Friday 8:00 a.m.-4:30 p.m., 617-494-2419, [email protected]dot.gov . For the Massachusetts Department of Transportation Highway Division (MassDOT): Ms. Mary Hynes, Project Manager... on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT...

  14. 76 FR 46357 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-08-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  15. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  16. Proposing a project for building an e-commerce website for Ryijypalvelu-RP Oy

    OpenAIRE

    Sotkov, Ilya

    2014-01-01

    The thesis describes the development of a project proposal report for building an e-commerce website for a small textile firm based in Helsinki, Finland. The aim of the study is to determine how small businesses that are currently not highly involved in e-commerce should approach developing an e-commerce website in order to maximize the positive impact of selling on the Internet. The study combined the use of action research and qualitative research methodologies by developing a project p...

  17. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  18. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  19. Swedish methane gas project: a proposal with three alternatives. Svenskt metangasprojekt: ett foerslag med tre alternativ

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    A proposal concerning a BIOGAS project is given. The proposal includes: (a) microbiological research on, e.g., needs for additives to optimize the process, influence of the content of dry substance, high rate digesters, one- or two-stage processing, temperature tolerance, pH regulation, pressure dependence, methods for process regulation, hygienics, foam-quenching; (b) construction of a test plant equipped with instruments for analysis and supervision; and (c) construction of prototype plants at a swine farm and at a slaughterhouse. Detailed budgets and schedules are given for the project at three different possible total costs.

  20. Results of the MITRA project: Monitoring and intervention for the transportation of dangerous goods

    International Nuclear Information System (INIS)

    Planas, E.; Pastor, E.; Presutto, F.; Tixier, J.

    2008-01-01

    The objective of the MITRA (monitoring and intervention for the transportation of dangerous goods) project was to prototype a new operational system for monitoring the transportation of dangerous goods in Europe based on regional responsibilities. This concept, based on systems used in air traffic control, aims to provide civil security centres with real-time knowledge of the position and contents of dangerous vehicles circulating in their area of responsibility, and, in the event of a dangerous situation, to issue warnings, alerts and crisis management information, thereby allowing intervention teams to react immediately with maximum safety. The project was funded by the European Commission under the 6th Framework Programme (STREP - specific targeted research project - under the Information Society Technologies priority). It started on 1 September 2004 and ended on 31 October 2006. This paper presents the results of this project and the conclusions derived from the field tests carried out in Germany and in the French/Spanish border region in order to test the proposed operational system

  1. A unique application of the instream flow incremental methodology (IFIM) to predict impacts on riverine aquatic habitat, resulting from construction of a proposed hydropower reservoir

    International Nuclear Information System (INIS)

    Foote, P.S.

    1999-01-01

    The City of Harrisburg, Pennsylvania, proposed to construct a new low-head hydroelectric project on the Susquehanna River in the central part of the state in 1986, about 108 km upstream of the river mouth. As part of the licensing process, the city was required by the Federal Energy Regulatory Commission to carry out studies that would forecast the impacts on riverine aquatic habitat as a result of construction of the proposed 13 km long by 1.5 km wide reservoir. The methodology selected by the city and its consultants was to use the IFIM to model the habitat conditions in the project reach both before and after construction of the proposed reservoir.The IFIM is usually used to model instream flow releases downstream of dams and diversions, and had not been used before to model habitat conditions within the proposed reservoir area. The study team hydraulically modelled the project reach using existing hydraulic data, and a HEC-2 backwater analysis to determine post-project water surface elevations. The IFG-4 model was used to simulate both pre- and post-project water velocities, by distributing velocities across transects based on known discharges and cell depth. Effects on aquatic habitat were determined using the IFIM PHABSIM program, in which criteria for several evaluation species and life stages were used to yield estimates of Weighted Usable Area. The analysis showed, based on trends in WUA from pre- and post-project conditions, that habitat conditions would improve for several species and life stages, and would be negatively affected for fewer life stages and species. Some agency concerns that construction of the proposed reservoir would have significant adverse effects on the resident and anadromous fish populations were responded to using these results

  2. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  3. Proposal of a model for evaluation of research and development projects in a public scientific and technological institution: a survey in CNEN

    International Nuclear Information System (INIS)

    Silva, Eduardo de Assumpcao

    2017-01-01

    Science and technology are directly related to the development of a country. The research and development projects in CNEN are financed by the direct resources of the budget of the Union and of the Development Agencies such as FINEP and CNPq. In general, project managers believe they can succeed when they complete a project on schedule, budget, and anticipated requirements, which is commonly known as a 'triple constraint' or 'iron triangle'. However, in the review of the literature, other criteria for evaluating success in projects, such as the benefits generated by society, the development of the team's capabilities, future opportunities, new technologies, among others, were verified. In this way, in order to assist the manager in the evaluation of this type of project, the present research carried out a review in the literature aiming to find concepts about success in projects and their evaluation criteria, proposed a model based on the theoretical reference and Importance and use of these criteria with the CNEN specialists, who work directly in the R and D projects of a public ICT in the nuclear area. The results showed that the criteria proposed in the model have a high degree of importance and show a decrease in the degree of utilization, suggesting that the criteria used in the model can help managers in the evaluation of these projects. (author)

  4. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  5. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  6. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  7. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    International Nuclear Information System (INIS)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10 9 electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE's National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE's evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc

  8. Literacy and students' interest on Geosciences - Findings and results of GEOschools project

    Science.gov (United States)

    Fermeli, Georgia; Steininger, Fritz; Dermitzakis, Michael; Meléndez, Guillermo; Page, Kevin

    2014-05-01

    GEOschools is a European project supported by the Lifelong Learning Programme. Among the main aims of the project were to investigate the interest secondary school students have on geosciences and the teaching strategies used. Also, the development of a guide for Geosciences Literacy at a European level (Fermeli et al., 2011). GEOschools' literacy framework proposal is based on a comparative analysis of geoscience curricula in the partner countries (Austria, Greece, Italy, Spain and Portugal). Results of an "Interest Research" survey involved around 1750 students and 60 teachers from partner countries, combined with specific proposals by the project partners (Calonge et al., 2011). Results of the GEOschools "Interest research" survey evidence students show a higher interest in those topics which have a potentially higher social impact, such as mass extinctions, dinosaurs, geological hazards and disasters and origin and evolution of life (including human evolution). These results provide an evidence base to justify why curriculum content and teaching strategies can be made more effective through focusing mainly on such "interest topics", instead of trying to follow an excessively rigid, or academic, development of teaching programs (Fermeli et al., 2013). GEOschools literacy framework is summarized in 14 separate chapters, each including a brief description of the main themes of each subject, the intended learning outcomes as well as keywords and a bibliography. More particularly, the chapters of the framework describe what students should know and do, and how they should relate, as European citizens, to the geosciences. To face the challenges of the present and the future, modern citizens should be literate in natural sciences and, within the context of the geosciences, be able to: • Demonstrate a knowledge and understanding of basic principles, models, laws and terminology of Geosciences. • Know how and where to find and access scientifically reliable

  9. Assessment of compliance costs resulting from implementation of the proposed Great Lakes water quality guidance

    International Nuclear Information System (INIS)

    Fenner, K.; Podar, M.; Snyder, B.

    1993-01-01

    The primary purpose of the study was to develop an estimate of the incremental cost to direct dischargers resulting from the implementation of the proposed Great Lakes Water Quality Guidance (GLWQG). This estimate reflects the incremental cost of complying with permit requirements developed using the Implementation Procedures and water quality criteria proposed in the GLWQG versus permit requirements based on existing State water quality standards. Two secondary analyses were also performed, one to develop a preliminary estimate of the costs that would be incurred by indirect dischargers to publicly owned treatment works (POTWs), and another to evaluate the cost-effectiveness of the GLWQG. Finally, several sensitivity analyses were performed to evaluate the impact of several major assumptions on the estimated compliance costs. To estimate compliance costs, permit limitations and conditions based on existing State water quality standards were compared to water quality-based limitations and conditions based on the proposed GLWQG criteria and Implementation Procedures for a sample of plants. The control measures needed to comply with the proposed GLWQG-based effluent limitations were evaluated. Individual plant compliance costs were estimated for these control measures based on information on treatment technology and cost analyses available in the literature. An overall compliance cost was projected from the sample based on statistical methods

  10. 77 FR 20355 - Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps

    Science.gov (United States)

    2012-04-04

    ... collection). Affected Public: Current recipients of EDA assistance, to include (1) cities or other political... DEPARTMENT OF COMMERCE Economic Development Administration Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps AGENCY: Economic Development...

  11. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  12. A projection-free method for representing plane-wave DFT results in an atom-centered basis

    International Nuclear Information System (INIS)

    Dunnington, Benjamin D.; Schmidt, J. R.

    2015-01-01

    Plane wave density functional theory (DFT) is a powerful tool for gaining accurate, atomic level insight into bulk and surface structures. Yet, the delocalized nature of the plane wave basis set hinders the application of many powerful post-computation analysis approaches, many of which rely on localized atom-centered basis sets. Traditionally, this gap has been bridged via projection-based techniques from a plane wave to atom-centered basis. We instead propose an alternative projection-free approach utilizing direct calculation of matrix elements of the converged plane wave DFT Hamiltonian in an atom-centered basis. This projection-free approach yields a number of compelling advantages, including strict orthonormality of the resulting bands without artificial band mixing and access to the Hamiltonian matrix elements, while faithfully preserving the underlying DFT band structure. The resulting atomic orbital representation of the Kohn-Sham wavefunction and Hamiltonian provides a gateway to a wide variety of analysis approaches. We demonstrate the utility of the approach for a diverse set of chemical systems and example analysis approaches

  13. Proposal and application of an approach based on AHP and ISO/IEC 25000 to support the evaluation of the quality of project management software systems

    Directory of Open Access Journals (Sweden)

    Matheus Henrique Bartolomeu Marques Morais

    2017-06-01

    Full Text Available In the current competitive scenario, organizations are seeking to improve factors that influence the administration and the success of their projects. The adoption of a project management software suitable to organizational requirements contributes to ensure satisfactory results. In this context, this study proposes a methodology to support the quality evaluation of project management software, which is based on the AHP method (Analytic Hierarchy Process as well as on the criteria and sub-criteria of ISO/IEC 25000. The AHP method is used to define the relevance of the criteria and sub-criteria chosen. The proposed methodology was applied to an illustrative case to select the most appropriate software. The alternatives Basecamp, MS Project, Service Desk and Primavera were evaluated. Primavera and MS Project achieved the higher global performance in the process evaluation, since they fulfill 29 of 30 requirements. However, due to some particularities of the evaluated products, Primavera was selected as being the most suitable.

  14. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  15. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  16. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  17. 28 CFR 512.20 - Publication of results of research project.

    Science.gov (United States)

    2010-07-01

    ... project. 512.20 Section 512.20 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  18. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  19. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  20. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  1. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  2. The studsvik BNCT project: structure and the proposed protocols

    International Nuclear Information System (INIS)

    Capala, J.; Stenstam, B.H.; Skoeld, K.; Henriksson, R.; Salford, L.; Carlsson, J.

    2000-01-01

    The BNCT facility at Studsvik is now ready for clinical trials. Scientific operations of the Studsvik BNCT project are overseen by the Scientific Advisory Board comprised of representatives of all major universities in Sweden. Furthermore, special task groups for clinical and preclinical studies have been formed to facilitate collaboration with academia and to assure the quality of the research. Proposed clinical Phase II trials for glioblastoma are sponsored by the Swedish National Neuro-Oncology Group and, initially, will involve two protocols: Protocol no.1. BNCT for glioblastoma patients who have not received any therapy other than surgery (including stereotactic biopsy only). Protocol no.2. BNCT as a palliative treatment for patients with recurrent glioblastoma following conventional therapies or BNCT. In both protocols, BPA, administered by a 6 hour i.v. infusion, will be used as the boron delivery agent. (author)

  3. The CGEM-IT of the BESIII experiment: project update and test results in magnetic field

    Science.gov (United States)

    Mezzadri, G.

    2016-08-01

    The BESIII experiment is a multi-purpose detector operating on the electron- positron collider BEPCII in Beijing. Since 2008, the world's largest sample of J/ψ, ψ’ were collected. Due to increasing luminosity, the inner drift chamber is showing signs of aging. In 2014, an upgrade was proposed by the Italian collaboration based on the Cylindrical Gas Electron Multipliers (CGEM) technology, developed within the KLOE-II experiment, but with several new features and innovations. In this contribution, an overview of the project will be presented. Preliminary results of a beam test will be shown, with particular focus on the detector performance in magnetic field, with different configurations of electric field. A new readout mode, the µTPC readout, will also be described. The project has been recognized as a Significant Research Project within the Executive Programme for Scientific and Technological Cooperation between Italy and P.R.C for the years 2013-2015, and more recently has been selected as one of the project funded by the European Commission within the call H2020- MSCA-RISE-2014.

  4. New concept for condition management of plants as a result of the KUNTO project. New operations approach reduces costs

    Energy Technology Data Exchange (ETDEWEB)

    McNiven, U.; Tamminen, L.

    1998-07-01

    IVO Generation Services Ltd. has carried out a project at the IVO Naantali power plant to develop the plants condition management. The project defines critical and monitored components for each system. In addition, recommendations for further action, investment proposals and suggestions for changes in maintenance and operations practices were supplied for the various systems in the plant. The systematic approach which was the result of the projects integrated into maintenance and operations practices where data collection and analysis is part of the routine. Up-to-date data is utilized in focusing maintenance and investments, in planning and reporting functions

  5. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  6. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  7. 75 FR 27854 - 30-Day Notice of Proposed Information Collection: DS-4048, Projected Sales of Major Weapons in...

    Science.gov (United States)

    2010-05-18

    ... Information Collection: DS-4048, Projected Sales of Major Weapons in Support of Section 25(a)(1) of the Arms... Reduction Act of 1995. Title of Information Collection: Projected Sales of Major Weapons in Support of... automated collection techniques or other forms of technology. Abstract of proposed collection: Section 25(a...

  8. Dataset Preservation for the Long Term: Results of the DareLux Project

    Directory of Open Access Journals (Sweden)

    Eugène Dürr

    2008-08-01

    Full Text Available The purpose of the DareLux (Data Archiving River Environment Luxembourg Project was the preservation of unique and irreplaceable datasets, for which we chose hydrology data that will be required to be used in future climatic models. The results are: an operational archive built with XML containers, the OAI-PMH protocol and an architecture based upon web services. Major conclusions are: quality control on ingest is important; digital rights management demands attention; and cost aspects of ingest and retrieval cannot be underestimated. We propose a new paradigm for information retrieval of this type of dataset. We recommend research into visualisation tools for the search and retrieval of this type of dataset.

  9. Proposed Fermilab upgrade main injector project

    International Nuclear Information System (INIS)

    1992-04-01

    The US Department of Energy (DOE) proposes to construct and operate a ''Fermilab Main Injector'' (FMI), a 150 GeV proton injector accelerator, at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The purpose and need for this action are given of this Environmental Assessment (EA). A description of the proposed FMI and construction activities are also given. The proposed FMI would be housed in an underground tunnel with a circumference of approximately 2.1 miles (3.4 kilometers), and the construction would affect approximately 135 acres of the 6,800 acre Fermilab site. The purpose of the proposed FMI is to construct and bring into operation a new 150 GeV proton injector accelerator. This addition to Fermilab's Tevatron would enable scientists to penetrate ever more deeply into the subatomic world through the detection of the super massive particles that can be created when a proton and antiproton collide head-on. The conversion of energy into matter in these collisions makes it possible to create particles that existed only an instant after the beginning of time. The proposed FMI would significantly extend the scientific reach of the Tevatron, the world's first superconducting accelerator and highest energy proton-antiproton collider

  10. New results from the RD52 (DREAM) project

    International Nuclear Information System (INIS)

    Wigmans, Richard

    2013-01-01

    Simultaneous detection of the Čherenkov light and scintillation light produced in hadron showers makes it possible to measure the electromagnetic shower fraction event by event and thus eliminate the detrimental effects of fluctuations in this fraction on the performance of calorimeters. In the RD52 (DREAM) project, the possibilities of this dual-readout calorimetry are investigated and optimized. In this talk, the latest results of this project will be presented. These results concern the performance of a matrix of molybdenum doped lead tungstate crystals built for this purpose, new data on the application of the polarization of Čherenkov light in this context, and the first test results of prototype modules for the new full-scale fiber calorimeter

  11. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  12. More dams planned for Nitassinan Rivers : Innu Nation backgrounder on the proposed Churchill River hydro projects

    International Nuclear Information System (INIS)

    1999-01-01

    The Labrador Innu have expressed their concerns regarding the proposed development of a huge hydroelectric project for the Nitassinan Rivers. The Innu people were not consulted regarding the negotiations which will take place between Newfoundland and Quebec. The biggest concern of the Innu people is the cumulative environmental and social effects of the proposed development and how it will contribute to opening up their territory to further development. For example, access roads, transmission corridors and large-scale clear-cut forestry operations would all impact on their traditional way of life. This paper also described the impacts that the Innu have already experienced as a result of hydroelectric development on the Nitassinan Rivers during the 1970s, when the government of Newfoundland gave the rights to develop and exploit water resources, forests and minerals to a private company. At that time, large areas of hunting and trapping territories were flooded, belongings were lost and burial sites were flooded. The flooding also resulted in increased levels of methyl mercury in fish in the reservoirs as well as downstream. The losses suffered by the Innu people have yet to be addressed by the governments

  13. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  14. Virtual enterprise architecture and methodology - Initial results from the Globeman21 project

    DEFF Research Database (Denmark)

    Vesterager, Johan; Larsen, Lars Bjørn; Gobbi, Chiara

    1999-01-01

    This paper will focus on presenting the initial results from the IMS project Globeman21 regarding generic models for Extended Enterprise Management (EEM). In particular the paper outlines a proposed architecture for the creation of virtual enterprises, industrial requirements regarding the generic...... models, terminology for describing extended enterprises, and initial considerations regarding a methodology for EEM. Globeman21 see the extended enterprise as a concept covering the totality of different concepts dealing with the expansion or extension of enterprise activities. One way of realising...... the concept of extended enterprise is through the creation of virtual enterprise, based on a more or less formalised network. This approach is the basis for the development of the generic EEM model within Globeman21....

  15. Principal results of 'DEWAM' project implementation, Russian Federation

    International Nuclear Information System (INIS)

    Nechaev, A.F.

    2002-01-01

    This overview summarizes the key results of the four-year project 'Decontamination and Waste Management in the Course of Research Reactors Decommissioning' carried out within the framework of the IAEA's CRP 'Decommissioning Techniques for Research Reactors'. The project included two principal components: (1) info-analytical studies and development of a database system, and (2) research and development in the areas of decontamination and waste management technologies applicable to decommissioning. Details of the work are expounded in 29 publications and annual Progress Reports; the results of the study are used in corresponding university courses; and innovative technologies for radwaste processing and environmental restoration are planned to be introduced into practice. (author)

  16. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  17. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  18. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    .... The Natural Programming Project is developing general principles, methods, and programming language designs that will significantly reduce the amount of learning and effort needed to write programs...

  19. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  20. Postface "The GITEWS Projectresults, summary and outlook"

    Directory of Open Access Journals (Sweden)

    U. Münch

    2011-03-01

    Full Text Available This paper reflects the experiences and results gained during the GITEWS project (German Indonesian Tsunami Early Warning System, which was funded by the Federal German Ministry of Education and Research between spring 2005 and spring 2011. Many of the individual results have been presented at international conferences and in international journals. The NHESS special issue offers a comprehensive overview of the key findings within the project and the first phase of operation of the warning system.

  1. PROJECT “5-100”: SOME INTERIM RESULTS

    Directory of Open Access Journals (Sweden)

    Г А Ключарев

    2018-12-01

    Full Text Available The tasks of modernization and development of education and science are of a key im-portance for the Russian Federation. Despite a number of significant changes in the Russian system of education and science over the last 10-15 years, the best Russian universities still cannot compete with the world leading universities. In 2013, to change this situation the state started one of its most ambitious projects to increase the international competitiveness of Russian universities, which is the project “5-100”. Though the need for such projects for the development of science and education is widely acknowledged, the “5-100” has received contradictory estimates of different stakeholders and experts. By 2017, the project approached its half-time line and spent a significant part of its resources, thus, it is time to consider its interim results. Moreover, the today’s close attention to the project determined numerous speculations not only in the media but also in scientific articles aiming to assess the project’s impact on the Russian system of education and science based on ideological and political judgments. The authors understand and accept all informed judgments but emphasize the importance of evaluating both reasons for such large-scale projects and factors affecting their implementations. A superficial estimate of the project “5-100” leads to the em-phasis on its minor disadvantages, which usually hides its less obvious positive sides. Thus, the article focuses on the role of the project “5-100” in the modernization of the Russian system of education and science, considers its different aspects, and identifies possible approaches to assess its efficiency at the final stages of its implementation (or to develop new projects to increase the international competitiveness of Russian universities.

  2. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  3. Scintilla European project, the successful research results

    Energy Technology Data Exchange (ETDEWEB)

    Sannie, G.; Kondrasov, V.; Corre, G.; Boudergui, K.; Perot, B.; Carasco, C.; Montemont, G. [Commissariat a l' energie atomique et aux energies alternatives, Saclay, Cadarache, Grenoble (France); Peerani, P.; Carrapico, C.; Tomanin, A.; Rosas, F.; Caviglia, M.; Eklund, G.; Tagziria, H. [European Commission, Joint Research Centre, ITU, Nuclear Security Unit, Ispra (Italy); Friedrich, H.; Chmel, S. [Fraunhofer-Institut fuer Naturwissenschaftlich - Technische Trendanalysen - INT, Euskirchen (Germany); De Vita, R.; Manchini, E.; Pavan, M. [Istituto Nazionale di Fisica Nucleare, Sezione di Genova, Genova (Italy); Grattarola, M.; Botta, E. [Ansaldo Nucleare S.P.A, Genova (Italy); Kovacs, A.; Lakosi, L. [Hungarian Academy of Sciences, Centre for Energy Research, Budapest (Hungary); Baumhauer, C.; Deheuninck, T.; Haddad, E. [ARTTIC, Paris (France); Petrossian, G.; Ferragut, A. [SAPHYMO, Massy (France); Dermody, G.; Crossingham, G. [Symetrica Security Ltd, Southampton (United Kingdom)

    2015-07-01

    The Scintilla FP7 project is ended in December 2014, the fruitful results of 3 years development and tests will be presented. SCINTILLA offers the capacity to finding a reliable alternative to Helium-3 based detection systems since the gas which is predominantly used in nuclear safeguards and security applications has now become very expensive, rare and nearly unavailable. SCINTILLA benchmarks results are based on international standards. Radiation Portal tests were carried out at the Joint Research Centre (JRC) in Ispra (Italy). The scintilla project addresses few mains issues. The first is to develop neutron detectors for Radiation Portal Monitor (RPM) and the second is the need of new wearable integrated solutions for Spectrometric Personal Radiation Monitor (SPRM). The partners which provide technical systems of the scintilla project are INFN-ANSALDO, CEA, SYMETRICA and SAPHYMO. For RPM, the objective is to find reliable alternatives to Helium-3 historical neutron detector and provide technical solutions which cope with tests for reliable mobile and cost effective. For Spectrometric Personal Radiation Monitor (SPRM), SCINTILLA is innovating in technology areas that offer complementary capabilities for detecting and identifying gamma, Two CZT (Cadmium Zinc Telluride) addressing contexts of used by first responder technologies, one is a wearable detector and the second is a gamma camera complemented by advanced image processing technologies. (authors)

  4. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  5. A Summary of NORA Project Results Related to Reactivity Measurements

    International Nuclear Information System (INIS)

    Berg, J.O.; Døderlein, J-M-; Haugset, K

    1969-01-01

    The NORA Project has been an international undertaking within the field of reactor physics, resulting from an agreement signed by the International Atomic Energy Agency and the Norwegian Government in April 1961, and subsequently renewed for three years in 1964 and one year in 1967. A summary of the research performed in the period 1961-1964 has been published in IAEA Technical Report Series no. 67. The Project work carried out through the years 1964-1968 will be covered in a forthcoming IAEA Technical Report. The main experimental facility used in the Project has been the zero-power reactor NORA Reactor kinetics, both experimental end theoretical, has been a major item of research in the NORA Project. The present report will briefly summarize results and conclusions considered relevant to the topic discussed by this Panel. Extensive referencing will be made to the final NORA Project Report

  6. Automation and robotics for the Space Exploration Initiative: Results from Project Outreach

    Science.gov (United States)

    Gonzales, D.; Criswell, D.; Heer, E.

    1991-01-01

    A total of 52 submissions were received in the Automation and Robotics (A&R) area during Project Outreach. About half of the submissions (24) contained concepts that were judged to have high utility for the Space Exploration Initiative (SEI) and were analyzed further by the robotics panel. These 24 submissions are analyzed here. Three types of robots were proposed in the high scoring submissions: structured task robots (STRs), teleoperated robots (TORs), and surface exploration robots. Several advanced TOR control interface technologies were proposed in the submissions. Many A&R concepts or potential standards were presented or alluded to by the submitters, but few specific technologies or systems were suggested.

  7. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  8. Proposal and Evaluation of Management Method for College Mechatronics Education Applying the Project Management

    Science.gov (United States)

    Ando, Yoshinobu; Eguchi, Yuya; Mizukawa, Makoto

    In this research, we proposed and evaluated a management method of college mechatronics education. We applied the project management to college mechatronics education. We practiced our management method to the seminar “Microcomputer Seminar” for 3rd grade students who belong to Department of Electrical Engineering, Shibaura Institute of Technology. We succeeded in management of Microcomputer Seminar in 2006. We obtained the good evaluation for our management method by means of questionnaire.

  9. Evaluation of dredged material proposed for ocean disposal from Red Hook/Bay Ridge project areas, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Barrows, E.S.; Borde, A.B. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1996-09-01

    The objective of the Red HookIBay Ridge project was to evaluate proposed dredged material from these two areas to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Sediment samples were collected from the Red Hook/Bay Ridge project areas. Tests and analyses were conducted. The evaluation of proposed dredged material from the Red Hook/Bay Ridge project areas consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water-column and benthic acute toxicity tests. Twenty-four individual sediment core samples were collected from these two areas and analyzed for grain size, moisture content, and total organic carbon (TOC). Three composite sediment samples, representing Red Hook Channel and the two Bay Ridge Reaches to be dredged, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAH), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the three Red Hook Bay Ridge sediment composites, were analyzed for metals, pesticides, and PCBS. Benthic acute toxicity tests were performed. Water-column or SPP toxicity tests were performed. Bioaccumulation tests were also conducted.

  10. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    International Nuclear Information System (INIS)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed

  11. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed.

  12. Salton Sea Scientific Drilling Project: A summary of drilling and engineering activities and scientific results

    Energy Technology Data Exchange (ETDEWEB)

    Ross, H.P.; Forsgren, C.K. (eds.)

    1992-04-01

    The Salton Sea Scientific g Project (SSSDP) completed the first major well in the United States Continental Scientific Drilling Program. The well (State 2-14) was drilled to 10,W ft (3,220 m) in the Salton Sea Geothermal Field in California's Imperial Valley, to permit scientific study of a deep, high-temperature portion of an active geothermal system. The program was designed to investigate, through drilling and testing, the subsurface thermal, chemical, and mineralogical environments of this geothermal area. Extensive samples and data, including cores, cuttings, geothermal fluids and gases, and geophysical logs, were collected for future scientific analysis, interpretation, and publication. Short duration flow tests were conducted on reservoirs at a depth of approximately 6,120 ft (1,865 m) and at 10,136 ft (3,089 m). This report summarizes all major activities of the SSSDP, from project inception in the fall of 1984 through brine-pond cleanup and site restoration, ending in February 1989. This report presents a balanced summary of drilling, coring, logging, and flow-test operations, and a brief summary of technical and scientific results. Frequent reference is made to original records, data, and publication of results. The report also reviews the proposed versus the final well design, and operational summaries, such as the bit record, the casing and cementing program, and the coring program. Summaries are and the results of three flow tests. Several teamed during the project.

  13. NASA Space Radiation Risk Project: Overview and Recent Results

    Science.gov (United States)

    Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.; hide

    2015-01-01

    The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.

  14. CO2 Injectivity in Geological Storages: an Overview of Program and Results of the GeoCarbone-Injectivity Project

    International Nuclear Information System (INIS)

    Lombard, J.M.; Egermann, P.; Azaroual, M.; Pironon, J.; Broseta, D.; Egermann, P.; Munier, G.; Mouronval, G.

    2010-01-01

    The objective of the GeoCarbone-Injectivity project was to develop a methodology to study the complex phenomena involved in the near well bore region during CO 2 injection. This paper presents an overview of the program and results of the project, and some further necessary developments. The proposed methodology is based on experiments and simulations at the core scale, in order to understand (physical modelling and definition of constitutive laws) and quantify (calibration of simulation tools) the mechanisms involved in injectivity variations: fluid/rock interactions, transport mechanisms, geomechanical effects. These mechanisms and the associated parameters have then to be integrated in the models at the well bore scale. The methodology has been applied for the study of a potential injection of CO 2 in the Dogger geological formation of the Paris Basin, in collaboration with the other ANR GeoCarbone projects. (authors)

  15. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  16. SANA - project results and PIK contributions

    Energy Technology Data Exchange (ETDEWEB)

    Bellmann, K; Erhard, M; Flechsig, M; Grote, R; Suckow, F

    1998-03-01

    This report includes the final project results of the two groups at PIK, involved in the project: Firstly, the newly developed physiologically-based forest growth model FORSANA was applied for the first time to three pine stands, which differed largely in their air pollution and deposition history. (The evaluation of the model is presented in PIK Report 32). The model was able to explain the growth during the last decades of at least two of the three stands from the climatic and deposition conditions at the sites. The third site was shown to be exceptional with respect to its relation between dimension and age, and was supposed to be exposed to major disturbances in the past, which could not be accounted for by the model. To extrapolate from the stand level to the regional level, FORSANA was initialised with spatially explicit data from forestry inventory and soil maps. Simulations were executed with measured weather records and regional distributions of deposition and air pollution, which were estimated on the basis of emission inventories and wind directions. Different assumptions about the development of air pollution had been applied to investigate different pollution abatement strategies. The results showed that a positive effect can be expected from the actual emission reductions close the main centres of emission, but showed also that this effect is decreasing with increasing distance from the emission source. (orig./KW)

  17. Procedure for matching synfuel users with potential suppliers. Appendix B. Proposed and ongoing synthetic fuel production projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-08-07

    To assist the Department of Energy, Office of Fuels Conversion (OFC), in implementing the synthetic fuel exemption under the Powerplant and Industrial Fuel Use Act (FUA) of 1978, Resource Consulting Group, Inc. (RCG), has developed a procedure for matching prospective users and producers of synthetic fuel. The matching procedure, which involves a hierarchical screening process, is designed to assist OFC in: locating a supplier for a firm that wishes to obtain a synthetic fuel exemption; determining whether the fuel supplier proposed by a petitioner is technically and economically capable of meeting the petitioner's needs; and assisting the Synthetic Fuels Corporation or a synthetic fuel supplier in evaluating potential markets for synthetic fuel production. A data base is provided in this appendix on proposed and ongoing synthetic fuel production projects to be used in applying the screening procedure. The data base encompasses a total of 212 projects in the seven production technologies.

  18. Recent results from the DREAM project

    International Nuclear Information System (INIS)

    Wigmans, Richard

    2009-01-01

    The aim of the DREAM project is to develop calorimeters that are able to measure the four-vectors of all fundamental constituents of matter, including fragmenting quarks, with a precision of 1% or better. To achieve this, the factors that limit the performance of the present generation of calorimeters are eliminated one by one, in the order at which these factors dominate. In this talk, I give an overview of the results achieved so far, and outline our plans for the future.

  19. New Regional and Global HFC Projections and Effects of National Regulations and Montreal Protocol Amendment Proposals

    Science.gov (United States)

    Velders, G. J. M.

    2015-12-01

    Hydrofluorocarbons (HFCs) are used as substitutes for ozone-depleting substances that are being phased out globally under Montreal Protocol regulations. New global scenarios of HFC emissions reach 4.0-5.3 GtCO2-eq yr-1 in 2050, which corresponds to a projected growth from 2015 to 2050 which is 9% to 29% of that for CO2 over the same time period. New baseline scenarios are formulated for 10 HFC compounds, 11 geographic regions, and 13 use categories. These projections are the first to comprehensively assess production and consumption of individual HFCs in multiple use sectors and geographic regions with emission estimates constrained by atmospheric observations. In 2050, in percent of global HFC emissions, China (~30%), India and the rest of Asia (~25%), Middle East and northern Africa (~10%), and USA (~10%) are the principal source regions; and refrigeration and stationary air conditioning are the major use sectors. National regulations to limit HFC use have been adopted recently in the European Union, Japan and USA, and four proposals have been submitted in 2015 to amend the Montreal Protocol to substantially reduce growth in HFC use. Calculated baseline emissions are reduced by 90% in 2050 by implementing the North America Montreal Protocol amendment proposal. Global adoption of technologies required to meet national regulations would be sufficient to reduce 2050 baseline HFC consumption by more than 50% of that achieved with the North America proposal for most developed and developing countries. The new HFC scenarios and effects of national regulations and Montreal Protocol amendment proposals will be presented.

  20. PRELIMINARY METHODOLOGICAL PROPOSAL FOR ESTIMATING ENVIRONMENTAL FLOWS IN PROJECTS APPROVED BY THE MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (MADS, COLOMBIA

    Directory of Open Access Journals (Sweden)

    Gabriel A. Pinilla Agudelo

    2014-01-01

    Full Text Available ABSTRACT A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogotá (UNC. The proposed method begins with an evaluation of hydrological criteria,continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macroinvertebrates, riparian vegetation, and fish. The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS. RESUMEN Se presenta una propuesta metodológica para estimar los caudales ambientales en grandes proyectos licenciados por la Agencia Nacional de Licencias Ambientales (ANLA de Colombia, resultado de un convenio interadministrativo suscrito entre el ahora Ministerio de Ambiente y Desarrollo Sostenible (MADS de Colombia y la Universidad Nacional de Colombia, Bogotá (UNC. El método propuesto parte de garantizar criterios hidrológicos, continúa con una validación hidráulica y de calidad del agua, sigue con la determinación de la integridad del hábitat, en un proceso iterativo que requiere evaluación para las condiciones antes y después de la construcción del proyecto y que permite establecer un caudal que, además de conservar las funciones ecológicas del río, garantiza los usos del recurso aguas abajo. Espec

  1. Baseline environmental survey of proposed uranium mining projects of Domiasiat, Meghalaya

    International Nuclear Information System (INIS)

    Khathing, D.T.; Myrboh, B.; Nongkynrih, P.; War, S.A.; Marbaniang, D.G.; Iongwai, P.S.

    2005-01-01

    West Khasi Hills District of Meghalaya is identified as having a large and rich deposits of Uranium. However, actual extraction on a commercial scale that may lead to an increase in the socio-economic development of the state in particular and the country in general, is yet to be undertaken. This is due to lack of any baseline environmental survey giving rise to speculative information and causing a fear psychosis in the minds of the locals populace about the negative effects of Uranium mining. A preoperational survey and environmental monitoring of the proposed mining sites and its adjacent areas would establish the baseline status of the natural radioactivity and some chemical constituents in different environmental matrices via. air, water, soil, biota and aquatic ecosystems. The North Eastern Hill University, Shillong, Meghalaya has undertaken the Project funded by DST and BRNS, Department of Atomic Energy, Govt. of India which aims to provide baseline environmental data on ambient air, water and soil quality in and around the proposed Uranium mining site of Domiasiat, West Khasi Hills in the state of Meghalaya. Trace elements (elements like Mg, Zn, Ca, K, Na, Se, As, Fe, Cu, Co, Cr, Ni, Pb, Cd, Mn etc) and the status of the activity in the samples are determined. (author)

  2. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  3. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  4. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  5. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Science.gov (United States)

    2011-02-01

    ... Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed Eagle Mountain Pumped... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments...

  6. FY2011 Budget Proposals and Projections

    Science.gov (United States)

    2010-03-29

    and FY2009, and corporate income tax receipts fell even more sharply. Federal deficits, according to OMB and CBO projections, will likely be high...gains receipts can be especially sensitive to cyclical economic conditions. Asset values and corporate profits—and thus federal corporate income tax and

  7. Projeto larga escala: uma proposta pedagógica atual Larga escala project: an actual pedagogic proposal

    Directory of Open Access Journals (Sweden)

    Anna Luiza de F. P. Lins Gryschek

    2000-06-01

    Full Text Available Discorre-se sobre um projeto de formação dos atendentes de enfermagem, o conhecido "Projeto Larga Escala", seu histórico, a legislação que o ampara e a sua trajetória na Secretaria Municipal da Saúde do Município de São Paulo. Conclui-se que o "Projeto Larga Escala" é uma proposta pedagógica válida, devendo ser incentivada e ampliada em âmbito nacional.This study discourses about a nursing project, the well known "Larga Escala Project", its history, the legislation that gives support to it and its trajectory in the Health Secretary of the Township of São Paulo. The conclusion is that the "Larga Escala Project" is a valid pedagogic proposal and it must be encouraged and amplified to all the national field.

  8. 76 FR 45551 - Post-2014 Resource Pool; Loveland Area Projects, Proposed Power Allocation

    Science.gov (United States)

    2011-07-29

    ... Proposed Power Allocation. SUMMARY: Western Area Power Administration (Western), a Federal power marketing... Pool Proposed Power Allocation developed under the requirements of the Power Marketing Initiative of... resulted in this Notice of Proposed Power Allocation. DATES: The comment period on this Notice of Proposed...

  9. Task Listings Resulting from the Vocational Competency Measures Project. Memorandum Report.

    Science.gov (United States)

    American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.

    This memorandum report consists of 14 task listings resulting from the Vocational Competency Measures Project. (The Vocational Competency Measures Project was a test development project that involved the writing and verification of task listings for 14 vocational occupational areas through over 225 interviews conducted in 27 states.) Provided in…

  10. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field.

  11. Forecasting of Radiation Belts: Results From the PROGRESS Project.

    Science.gov (United States)

    Balikhin, M. A.; Arber, T. D.; Ganushkina, N. Y.; Walker, S. N.

    2017-12-01

    Forecasting of Radiation Belts: Results from the PROGRESS Project. The overall goal of the PROGRESS project, funded in frame of EU Horizon2020 programme, is to combine first principles based models with the systems science methodologies to achieve reliable forecasts of the geo-space particle radiation environment.The PROGRESS incorporates three themes : The propagation of the solar wind to L1, Forecast of geomagnetic indices, and forecast of fluxes of energetic electrons within the magnetosphere. One of the important aspects of the PROGRESS project is the development of statistical wave models for magnetospheric waves that affect the dynamics of energetic electrons such as lower band chorus, hiss and equatorial noise. The error reduction ratio (ERR) concept has been used to optimise the set of solar wind and geomagnetic parameters for organisation of statistical wave models for these emissions. The resulting sets of parameters and statistical wave models will be presented and discussed. However the ERR analysis also indicates that the combination of solar wind and geomagnetic parameters accounts for only part of the variance of the emissions under investigation (lower band chorus, hiss and equatorial noise). In addition, advances in the forecast of fluxes of energetic electrons, exploiting empirical models and the first principles IMPTAM model achieved by the PROGRESS project is presented.

  12. Assessing U.S. ESCO industry performance and market trends: Results from the NAESCO database project

    International Nuclear Information System (INIS)

    Osborn, Julie; Goldman, Chuck; Hopper, Nicole; Singer, Terry

    2002-01-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective informative and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects - the most comprehensive data set of the U.S. ESCO industry available. These projects include$2.55B of work completed by 51 ESCOs and span much of the history of this industry

  13. Proposal of experimental facilities for studies of nuclear data and radiation engineering in the Intense Proton Accelerator Project

    CERN Document Server

    Baba, M; Nagai, Y; Ishibashi, K

    2003-01-01

    A proposal is given on the facilities and experiments in the Intense Proton Accelerator Project (J-PARC) relevant to the nuclear data and radiation engineering, nuclear astrophysics, nuclear transmutation, accelerator technology and space technology and so on. (3 refs).

  14. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties... Joaquin County and Holland Tract and Webb Tract are located in Contra Costa County. A wetland delineation...

  15. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  16. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  17. The proposed irradiation facility and applications

    International Nuclear Information System (INIS)

    Singson, C.C.; Navarro, Q.O.

    As early as 1972, the Philippine Atomic Energy Commission proposed the setting up of a radiation facility for the sterilization of medical products. A result of a market survey with the assistance of an IAEA expert was conducted to determine the market potential for such venture. With the Food Terminal, Inc. (FTI) a government agro-industrial fair which explored the economic benefits of project, encouraging results have been obtained with finances from FAO and IAEA. The proposed pilot plant will serve as a multi purpose facility for the sterilization of medical and laboratory products, irradiation of food and agricultural produce and manufacture of wood plastic compositions for the textile and furniture industries. With the benefits derived from the said project, it is hoped that its early installation be pushed through. (author)

  18. Multi-Agent Modeling in Managing Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    K. Y. Chau

    2009-10-01

    Full Text Available In this paper, a multi-agent model is proposed for considering the human resources factor in decision making in relation to the six sigma project. The proposed multi-agent system is expected to increase the acccuracy of project prioritization and to stabilize the human resources service level. A simulation of the proposed multiagent model is conducted. The results show that a multi-agent model which takes into consideration human resources when making decisions about project selection and project team formation is important in enabling efficient and effective project management. The multi-agent modeling approach provides an alternative approach for improving communication and the autonomy of six sigma projects in business organizations.

  19. Archaeological Excavation Report for Proposed Well 199-K-131 in Support of the 100-KR-4 Pump-and-Treat Project

    Energy Technology Data Exchange (ETDEWEB)

    Woody, Dave M.; Prendergast-Kennedy, Ellen L.

    2004-06-22

    An archaeological excavation was conducted at the site of proposed groundwater monitoring well 199-K-131 in support of the 100-KR-4 Pump-and-Treat Project between June 2 and 3, 2004. Excavations confirmed that there were no intact cultural deposits at the proposed well location. This report was prepared to document the findings of the test excavation.

  20. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  1. Applying the results based management framework to the CERCA multi-component project in adolescent sexual and reproductive health: a retrospective analysis.

    Science.gov (United States)

    Cordova-Pozo, Kathya; Hoopes, Andrea J; Cordova, Freddy; Vega, Bernardo; Segura, Zoyla; Hagens, Arnold

    2018-02-08

    Adolescent sexual and reproductive health (SRH), problems such as unplanned pregnancies are complex and multifactorial, thus requiring multifaceted prevention interventions. Evaluating the impact of such interventions is important to ensure efficiency, effectiveness and accountability for project funders and community members. In this study, we propose Results Based Management (RBM) as a framework for project management, using the Community Embedded Reproductive Health Care for Adolescents (CERCA) as a case study for RBM. The CERCA Project (2010-2014) tested interventions to reduce adolescent pregnancy in three Latin American countries, Bolivia, Ecuador and Nicaragua. Activities were designed to increase adolescent SRH behaviors in four domains: communication with parents, partners and peers; access to SRH information; access to SRH services; and use of contraception. When the project ended, the outcome evaluation showed limited impact with concerns about accuracy of monitoring and attrition of participants. We reviewed and analyzed a series of CERCA documents and related data sources. Key findings from these documents were organized within an RBM framework (planning, monitoring, and impact evaluation) to understand how CERCA methodology and performance might have reaped improved results. Strengths and weaknesses were identified in all three elements of the RBM framework. In Planning, the proposed Theory of Change (ToC) differed from that which was carried out in the intervention package. Each country implemented a different intervention package without articulated assumptions on how the activities of intervention would bring about change. In Monitoring, the project oversight was mainly based on administrative and financial requirements rather than monitoring fidelity and quality of intervention activities. In Impact Evaluation, the original CERCA evaluation assessed intervention effects among adolescents, without identifying success and failure factors related to

  2. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  3. Recent Results from the SAFIR Project

    Directory of Open Access Journals (Sweden)

    M. Sánchez-Portal

    2014-12-01

    Full Text Available The "Seyfert and star formation Activity in the Far-Infrared" (SAFIR project is aimed at studying the physical nature of the nuclear IR emission and star formation properties of a small sample of nearby Seyfert galaxies observed with the PACS and SPIRE instruments on board the Herschel space observatory. In this paper, we review the achieved results, that reveal the importance of the far-IR range to improve the quality and reliability of the estimates of basic AGN torus parameters, and describe some preliminary outcome from the on-going work on the dust properties of resolved AGN host galaxies.

  4. Coupled behaviour of bentonite buffer results of PUSKURI project

    International Nuclear Information System (INIS)

    Olin, M.; Rasilainen, K.; Itaelae, A.

    2011-08-01

    In the report main results form a KYT2010 programme's project Coupled behaviour of bentonite buffer (PUSKURI) are presented. In THC modelling, Aku Itaelae made and published his Master of Science Thesis. Itaelae was able to successfully model the LOT-experiment. Additionally, he also listed problems and development proposals for THC-modelling of bentonite buffer. VTT and Numerola created in collaboration a model coupling saturation, diffusion and cation exchange; the model was implemented and tested in Numerrin, COMSOL and TOUGHREACT. Petri Jussila's PhD THM-model was implemented into COMSOL to facilitate further development. At GTK, the mineralogical characterisation of bentonite was planned. The previous THM model (Jussila's model) including only small deformations was successfully generalized to finite deformations in way at least formally preserving the original formalism. It appears that the theory allows also a possibility to include finite plastic deformations in the theory. In order to measure the relevant mechanical properties of compacted bentonite, two different experiments, namely hydrostatic compression experiment and one-dimensional compression experiment were designed. In the hydrostatic compression experiment, a cylindrical sample of compacted bentonite covered with liquid rubber coating is placed in the sample chamber equipped with a piston. The same device was also used in one-dimensional compression experiment. X-ray microtomographic techniques were used in order to study the basic mechanisms of water transport in bentonite. The preliminary results indicate that in the present experimental set-up, water transport is dominated by a dispersive mechanism such as diffusion of vapour in gas phase or diffusion of water in solid phase. (orig.)

  5. Assessment of wind turbine wake-effects in the proposed "Markerwaard" wind/hydro project

    NARCIS (Netherlands)

    Vermeulen, P.E.J.; Builtjes, P.J.H.; Vijge, J.B.A.; Smet, L. de

    1980-01-01

    Figure I gives on overview of the location of the "Markerwaard" area within the "IJsselmeer" lake in the middle of the Netherlands. This area is the last part of the large reclamation project in the "IJsselmeer" lake. This project has resulted thus far in the realisation of four polders of roughly

  6. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  7. Small scale renewable solar energy and the best result project

    Energy Technology Data Exchange (ETDEWEB)

    Bilbao, J.; Miguel, A.H.; Perez-Burgos, A.M. [Valladolid Univ. (Spain)

    2008-07-01

    The European Community has established programmes with different Projects in relation with the develop of an energy system according to de Kyoto objectives, improving energy efficiency, maintaining security supply and doubling the share of renewable energy use. The Best Result Project (Building and Energy Systems and Technology in Renewable Energy Sources Update and Linked Training), is financed by the European Commission, Intelligent Energy Agency (EIE) and the project objectives are to develop training and diffusion activities in the field of Renewable Energy Technology. The project aims to raise the renewable energy knowledge among suppliers and general public. The project activities are: basis and specialized training events, workshops, meetings, visits and e-learning common platform. The final objective is to extend the market of small scale RES applications in the building and energy sector through common and local activities addressing RES suppliers and consumers. (orig.)

  8. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  9. Modified Projection Algorithms for Solving the Split Equality Problems

    Directory of Open Access Journals (Sweden)

    Qiao-Li Dong

    2014-01-01

    proposed a CQ algorithm for solving it. In this paper, we propose a modification for the CQ algorithm, which computes the stepsize adaptively and performs an additional projection step onto two half-spaces in each iteration. We further propose a relaxation scheme for the self-adaptive projection algorithm by using projections onto half-spaces instead of those onto the original convex sets, which is much more practical. Weak convergence results for both algorithms are analyzed.

  10. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I; FINAL

    International Nuclear Information System (INIS)

    Bou-Mikael, Sami

    2002-01-01

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field

  11. Planned and ongoing projects (pop) database: development and results.

    Science.gov (United States)

    Wild, Claudia; Erdös, Judit; Warmuth, Marisa; Hinterreiter, Gerda; Krämer, Peter; Chalon, Patrice

    2014-11-01

    The aim of this study was to present the development, structure and results of a database on planned and ongoing health technology assessment (HTA) projects (POP Database) in Europe. The POP Database (POP DB) was set up in an iterative process from a basic Excel sheet to a multifunctional electronic online database. The functionalities, such as the search terminology, the procedures to fill and update the database, the access rules to enter the database, as well as the maintenance roles, were defined in a multistep participatory feedback loop with EUnetHTA Partners. The POP Database has become an online database that hosts not only the titles and MeSH categorizations, but also some basic information on status and contact details about the listed projects of EUnetHTA Partners. Currently, it stores more than 1,200 planned, ongoing or recently published projects of forty-three EUnetHTA Partners from twenty-four countries. Because the POP Database aims to facilitate collaboration, it also provides a matching system to assist in identifying similar projects. Overall, more than 10 percent of the projects in the database are identical both in terms of pathology (indication or disease) and technology (drug, medical device, intervention). In addition, approximately 30 percent of the projects are similar, meaning that they have at least some overlap in content. Although the POP DB is successful concerning regular updates of most national HTA agencies within EUnetHTA, little is known about its actual effects on collaborations in Europe. Moreover, many non-nationally nominated HTA producing agencies neither have access to the POP DB nor can share their projects.

  12. A low complexity reweighted proportionate affine projection algorithm with memory and row action projection

    Science.gov (United States)

    Liu, Jianming; Grant, Steven L.; Benesty, Jacob

    2015-12-01

    A new reweighted proportionate affine projection algorithm (RPAPA) with memory and row action projection (MRAP) is proposed in this paper. The reweighted PAPA is derived from a family of sparseness measures, which demonstrate performance similar to mu-law and the l 0 norm PAPA but with lower computational complexity. The sparseness of the channel is taken into account to improve the performance for dispersive system identification. Meanwhile, the memory of the filter's coefficients is combined with row action projections (RAP) to significantly reduce computational complexity. Simulation results demonstrate that the proposed RPAPA MRAP algorithm outperforms both the affine projection algorithm (APA) and PAPA, and has performance similar to l 0 PAPA and mu-law PAPA, in terms of convergence speed and tracking ability. Meanwhile, the proposed RPAPA MRAP has much lower computational complexity than PAPA, mu-law PAPA, and l 0 PAPA, etc., which makes it very appealing for real-time implementation.

  13. FY 1980 Report on results of research and development project, commissioned by Sunshine Project. Researches on R and D of management procedures; 1980 nendo kenkyu kaihatsu kanri shuho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    The strategic system planning procedures have been developed and applied for drafting R and D targets and subsequent medium-term plans, in order to help promote the Sunshine Project smoothly, based on the long-term prospects. This project compares the developed procedures with the current promotion systems and R and D management supporting procedures, to establish the strategic system planning procedures. These newly developed procedures are expected to accelerate the Sunshine Project, when applied in the standard manner. They are also partly applied to coal liquefaction techniques for (system demand analysis), the results of which are used to propose the ideal R and D targets of these techniques. The milestone planning procedures are preliminary applied to (establishing the project plans), to draw systematic long-, medium- and short-term plans. The preliminary application of these prediction/analysis and supporting procedures has verified effectiveness of the strategic system planning procedures. (NEDO)

  14. New Results from the Geoengineering Model Intercomparison Project (GeoMIP)

    Science.gov (United States)

    Robock, A.; Kravitz, B.

    2013-12-01

    The Geoengineering Model Intercomparison Project (GeoMIP) was designed to determine robust climate system model responses to Solar Radiation Management (SRM). While mitigation (reducing greenhouse gases emissions) is the most effective way of reducing future climate change, SRM (the deliberate modification of incoming solar radiation) has been proposed as a means of temporarily alleviating some of the effects of global warming. For society to make informed decisions as to whether SRM should ever be implemented, information is needed on the benefits, risks, and side effects, and GeoMIP seeks to aid in that endeavor. GeoMIP has organized four standardized climate model simulations involving reduction of insolation or increased amounts of stratospheric sulfate aerosols to counteract increasing greenhouse gases. Thirteen comprehensive atmosphere-ocean general circulation models have participated in the project so far. GeoMIP is a 'CMIP Coordinated Experiment' as part of the Climate Model Intercomparison Project 5 (CMIP5) and has been endorsed by SPARC (Stratosphere-troposphere Processes And their Role in Climate). GeoMIP has held three international workshops and has produced a number of recent journal articles. GeoMIP has found that if increasing greenhouse gases could be counteracted with insolation reduction, the global average temperature could be kept constant, but global average precipitation would reduce, particularly in summer monsoon regions around the world. Temperature changes would also not be uniform. The tropics would cool, but high latitudes would warm, with continuing, but reduced sea ice and ice sheet melting. Temperature extremes would still increase, but not as much as without SRM. If SRM were halted all at once, there would be rapid temperature and precipitation increases at 5-10 times the rates from gradual global warming. SRM combined with CO2 fertilization would have small impacts on rice production in China, but would increase maize production

  15. Evaluation of Dredged Material Proposed for Ocean Disposal from Federal Projects in New York and New Jersey and the Military Ocean Terminal (MOTBY)

    Energy Technology Data Exchange (ETDEWEB)

    Barrows, E.S.; Antrim, L.D.; Pinza, M.R.; Gardiner, W.W.; Kohn, N.P.; Gruendell, B.D.; Mayhew, H.L.; Word, J.Q.; Rosman, L.B. [Battelle Marine Sciences Laboratory, Sequim, Washington (United States)

    1996-08-01

    The U.S. Army Corps of Engineers (USACE) is authorized by Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (MPRSA), Public Law 92-532, and by the Clean Water Act of 1972 (CWA) and Amendments of 1977 to permit, evaluate, and regulate the disposal of dredged material in ocean waters to minimize adverse environmental effects. Compliance with the regulations of the MPRSA calls for physical and biological testing of sediment proposed for dredging prior to its disposal in ocean waters. The testing required by the MPRSA criteria is conducted under a testing manual developed by the USACE and the U.S. Environmental Protection Agency (EPA), Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), commonly referred to as the `Green Book.` Testing protocols in the Green Book include bulk sediment analysis, grain size analysis, elutriate testing, and biological testing. The biological testing includes bioassays for acute toxicity as well as analysis to determine bioaccumulation of certain contaminants by marine organisms. The objective of the USACE-NYD Federal Projects Program was to evaluate sediment proposed for dredging and unconfined ocean disposal at the Mud Dump Site. The results of analytical measurements and bioassays performed on the test sediments were compared with analyses of sediment from the Mud Dump Reference Site to determine whether the test sediments were acutely toxic to marine organisms or resulted in statistically significantly greater bioaccumulation of contaminants in marine organisms, relative to the reference sediment. Testing for the federal project areas was performed according to the requirements.

  16. 77 FR 31037 - Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in...

    Science.gov (United States)

    2012-05-24

    ...; AZA34425] Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in... of up to 2 years. This is for the purpose of processing one solar energy right-of-way (ROW) application submitted by Pacific Solar Investments, LLC, to construct and operate the Hyder Valley Solar...

  17. An assessment strategy for proposals of engineering projects in the Bachelor of Biomedical Engineering Curriculum at Universidad Autónoma Metropolitana-Iztapalapa.

    Science.gov (United States)

    Castañeda-Villa, N; Jiménez-González, A; Ortiz-Posadas, M R

    2015-08-01

    Since 1974, the Bachelor of Biomedical Engineering Program (BBME) is offered at Universidad Autónoma Metropolitana-Iztapalapa, in Mexico City. By design, it must be completed in four years (12 trimesters) and, in the latter three, the senior students work on a BME project, which is done by completing three modules: Project Seminar (PS), Project on BME I and Project on BME II. In the PS module, the student must find a problem of interest in the BME field and suggest a solution through the development of an Engineering Project Proposal (EPP). Currently, the module is being taught by two faculty members of the BBME, who instruct students on how to develop their EPPs and evaluate their progress by reviewing a number of EPPs during the trimester. This generates a huge workload for the module instructors, which makes it necessary to involve more faculty members trimester-to-trimester (i.e. every 12 weeks) and, therefore, to create a set of systematic guidelines that ease the evaluation process for new instructors. Hence, the purpose of this paper is to present an assessment strategy (in the form of an assessment matrix) for the PS module as well as some preliminary results after two trimesters of its implementation.

  18. Thorium utilization as a Pu-burner: proposal of Plutonium-Thorium Mixed Oxide (PT-MOX) Project

    International Nuclear Information System (INIS)

    Aizawa, Otohiko

    2000-01-01

    In this paper, a Pu-Th mixed oxide (PT-MOX) project is proposed for a thorium utilization and a plutonium burning. None of plutonium can be newly produced from PT-MOX fuel, and the plutonium mass of about 1 ton can be consumed with one reactor (total heavy metal assumed: 100 tons) for 1 year. In order to consume plutonium produced from usual Light Water Reactor, it should be better to operate one PT-MOX reactor for three to five Light Water Reactors. (author)

  19. Florar Project: a forest proposal to PETROBRAS-TRANSPETRO; Projeto Florar: uma proposta florestal para a PETROBRAS-TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Melo Neto, Joao Evangelista de; Martini, Andrea Dietrich; Ozorio, Tarcisio Faria; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This work presents for discussion a proposal of a forest project idealized to be implemented, in form of a linear forest, in the long of TRANSPETRO pipeway, from north to south of the country. The initial goals, restricted to the State of Sao Paulo, presume the forest fomentation of 1,000 kilometers of path, covering an area of approximately 10,000 hectares, where can be possible to realize native and exotic species plantation, considering the legal restrictions. The proposal presumes also a fund to the special nature reserve creation in the cities crossed by TRANSPETRO pipeways. The pilot proposed in this work could take place at 'Plano Diretor de Dutos de Sao Paulo', which involves 27 cities, incorporating the environmental recuperation programs from native vegetation suppression and intervention in permanent preservation area in terms of forest law. (author)

  20. Dark Matter Time Projection Chamber : Recent R&D Results

    Science.gov (United States)

    Battat, J. B. R.; Ahlen, S.; Chernicoff, M.; Deaconu, C.; Dujmic, D.; Dushkin, A.; Fisher, P.; Henderson, S.; Inglis, A.; Kaboth, A.; Kirsch, L.; Lopez, J. P.; Monroe, J.; Ouyang, H.; Sciolla, G.; Tomita, H.; Wellenstein, H.

    2012-02-01

    The Dark Matter Time Projection Chamber collaboration recently reported a dark matter limit obtained with a 10 liter time projection chamber filled with CF4 gas. The 10 liter detector was capable of 2D tracking (perpendicular to the drift direction) and 2D fiducialization, and only used information from two CCD cameras when identifying tracks and rejecting backgrounds. Since that time, the collaboration has explored the potential benefits of photomultiplier tube and electronic charge readout to achieve 3D tracking, and particle identification for background rejection. The latest results of this effort is described here.

  1. Results of the ITER toroidal field model coil project

    International Nuclear Information System (INIS)

    Salpietro, E.; Maix, R.

    2001-01-01

    In the scope of the ITER EDA one of the seven largest projects was devoted to the development, manufacture and testing of a Toroidal Field Model Coil (TFMC). The industry consortium AGAN manufactured the TFMC based on on a conceptual design developed by the ITER EDA EU Home Team. The TFMC was completed and assembled in the test facility TOSKA of the Forschungszentrum Karlsruhe in the first half of 2001. The first testing phase started in June 2001 and lasted till October 2001. The first results have shown that the main goals of the project have been achieved

  2. MODEL REQUEST FOR PROPOSALS TO PROVIDE ENERGY AND OTHER ATTRIBUTES FROM AN OFFSHORE WIND POWER PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jeremy Firestone; Dawn Kurtz Crompton

    2011-10-22

    This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

  3. Analysis of uses and competitions of water resources or an original dissemination strategy of hydrological modelling results of an EU project ?

    Science.gov (United States)

    La Jeunesse, Isabelle; Fustec, Klervi; Larrue, Corinne; Trottier, Julie

    2010-05-01

    We propose to address the question of security threats through an analysis of water uses and competitions in the current situation, on one hand, and in conditions of climate change, on the other hand, in order to have an operational dissemination of hydrological modelling results. This will be carried out for each case study of the EU project CLIMB (7th EU FP). In this particular case, climate change impacts are to be considered in relation with water uses and rivalries. Taking them into account while involving stakeholders should allow us to have a deep impact on water uses regulation under conditions of climate change. The originality of this methodology, the first objective of which within the project is to disseminate project results and interact with stakeholders, is to use the dissemination phase as a means of involving stakeholder knowledge concerning water uses and competitions. The idea is to let the stakeholders identify themselves, in each case study, by means of interactive methods, the impact of the change of hydrological regime on their own water uses and competitions. We propose to use a real "bottom-up" strategy to assess the potential water uses and rivalries in the context of water scarcity (or flood) due to climate change. Such an approach will allow us to evaluate the risk of an increase in water rivalries and threats to security following climate change impacts scenarios at the river basin scale.

  4. Initial communication survey results for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Beck, D.M.

    1991-03-01

    To support the public communication efforts of the Technical Steering Panel of the Hanford Environmental Dose Reconstruction (HEDR) Project, a public survey was conducted. The survey was intended to provide information about the public's knowledge and interest in the project and the best ways to communicate project results. Questions about the project were included as part of an omnibus survey conducted by Washington State University. The survey was conducted by phone to Washington State residents in the spring of 1990. This report gives the HEDR-related questions and summary data of responses. Questions associated with the HEDR Project were grouped into four categories: knowledge of the HEDR Project; interest in the project; preferred ways of receiving information about the project (including public information meetings, a newsletter mailed to homes, presentations to civic groups in the respondent's community, a computer bulletin board respondent could access with a modem, information displays at public buildings and shopping malls, and an information video sent to respondent); and level of concern over past exposure from Hanford operations. Questions abut whom state residents are most likely to trust about radiation issues were also part of the omnibus survey, and responses are included in this report

  5. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  6. Economic critique of Nam Theun-Hinboun Hydropower Project and electricity development in Laos: proposal for an alternative path to development

    International Nuclear Information System (INIS)

    Adams, T.

    1996-01-01

    A proposed alternative to the development of a large-scale hydropower project in Laos was presented. The alternative is intended to help make electricity development sustainable over the long term and to benefit the citizens of Laos. The author carefully analyzed the Asian Development Bank report RRP: Laos 27325 of October 1994. He concluded that as presently constituted, the project is likely to fail as an investment and is likely to result in a significant net financial liability. Water resources are one of Laos' greatest assets and the future uses of Laotian rivers could be lost in order to achieve near-term electricity development. It was suggested that Laos should follow three key principles in the development of its electricity sector: maximize economic efficiency, ensure that the government acts as a regulator and not as an investor, and ensure the protection of property rights of citizens and investors. Relevant aspects of the experience with electricity development in Canada were also outlined

  7. A rapid parallelization of cone-beam projection and back-projection operator based on texture fetching interpolation

    Science.gov (United States)

    Xie, Lizhe; Hu, Yining; Chen, Yang; Shi, Luyao

    2015-03-01

    Projection and back-projection are the most computational consuming parts in Computed Tomography (CT) reconstruction. Parallelization strategies using GPU computing techniques have been introduced. We in this paper present a new parallelization scheme for both projection and back-projection. The proposed method is based on CUDA technology carried out by NVIDIA Corporation. Instead of build complex model, we aimed on optimizing the existing algorithm and make it suitable for CUDA implementation so as to gain fast computation speed. Besides making use of texture fetching operation which helps gain faster interpolation speed, we fixed sampling numbers in the computation of projection, to ensure the synchronization of blocks and threads, thus prevents the latency caused by inconsistent computation complexity. Experiment results have proven the computational efficiency and imaging quality of the proposed method.

  8. Market trends in the U.S. ESCO industry: Results from the NAESCO database project

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles A.; Osborn, Julie G.; Hopper, Nicole C.; Singer, Terry E.

    2002-05-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective information and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects-the most comprehensive data set of the U.S. ESCO industry available. These projects include $2.55B of work completed by 51 ESCOs and span much of the history of this industry. We estimate that the ESCO industry completed $1.8-2.1B of projects in 2000. The industry has grown rapidly over the last decade with revenues increasing at a 24% annualized rate. We summarize and compare project characteristics and costs and analyze energy savings, including the relationship between predicted and actual savings. ESCOs typically invested about $2.30/ft{sup 2} per project in various energy efficiency improvements, although there is large variation in project costs within and across market segments. We find that lighting-only projects report median electricity savings of 47% of targeted equipment consumption; the median for lighting-&-non-lighting projects is 23% of the total electric bill baseline. We examine project economics, including project net benefits, benefit/cost ratio and simple payback time. Median simple payback time is seven years for institutional sector projects and three years in the private sector. We estimate direct economic benefits of $1.62 billion for the 1080 projects in our database with both cost and savings data. The median benefit/cost ratio is 2.1 for 309 private sector projects and 1.6 for 771 institutional sector projects. We discuss the role of policies and programs adopted by state/federal legislatures and agencies that have played an important role in stimulating ESCO activity

  9. Study and Proposal of the Nuclear Power Plant Technology for the Ninh Thuan 2 Project

    International Nuclear Information System (INIS)

    Tran Chi Thanh; Le Van Hong; Hoang Sy Than; Nguyen Van De; Mai Dinh Trung; Nguyen Nhi Dien; Nguyen Minh Tuan; Pham Van Lam; Phan Ngoc Tuyen; Do Chi Dung; Hoang Minh Giang; Le Dai Dien

    2015-01-01

    The Ninh Thuan 1&2 Nuclear Power Plant Projects were approved on November 25th, 2009. At present, the task of NPP technology selection of these projects is an important and complex task. This report will show the acceptable method to create a set of criterion for selecting technology for Ninh Thuan 2 NPP project. The result of evaluation of three NPP technologies, such as ATMEA1, AP1000 and MPWR+ introduced in the Feasibility Study Reports of this project, will be discussed. In conclusion, the AP1000 technology is the first candidate for the Ninh Thuan 2 NPP Project. (author)

  10. Lesion insertion in the projection domain: Methods and initial results

    International Nuclear Information System (INIS)

    Chen, Baiyu; Leng, Shuai; Yu, Lifeng; Yu, Zhicong; Ma, Chi; McCollough, Cynthia

    2015-01-01

    Purpose: To perform task-based image quality assessment in CT, it is desirable to have a large number of realistic patient images with known diagnostic truth. One effective way of achieving this objective is to create hybrid images that combine patient images with inserted lesions. Because conventional hybrid images generated in the image domain fails to reflect the impact of scan and reconstruction parameters on lesion appearance, this study explored a projection-domain approach. Methods: Lesions were segmented from patient images and forward projected to acquire lesion projections. The forward-projection geometry was designed according to a commercial CT scanner and accommodated both axial and helical modes with various focal spot movement patterns. The energy employed by the commercial CT scanner for beam hardening correction was measured and used for the forward projection. The lesion projections were inserted into patient projections decoded from commercial CT projection data. The combined projections were formatted to match those of commercial CT raw data, loaded onto a commercial CT scanner, and reconstructed to create the hybrid images. Two validations were performed. First, to validate the accuracy of the forward-projection geometry, images were reconstructed from the forward projections of a virtual ACR phantom and compared to physically acquired ACR phantom images in terms of CT number accuracy and high-contrast resolution. Second, to validate the realism of the lesion in hybrid images, liver lesions were segmented from patient images and inserted back into the same patients, each at a new location specified by a radiologist. The inserted lesions were compared to the original lesions and visually assessed for realism by two experienced radiologists in a blinded fashion. Results: For the validation of the forward-projection geometry, the images reconstructed from the forward projections of the virtual ACR phantom were consistent with the images physically

  11. Lesion insertion in the projection domain: Methods and initial results

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Baiyu; Leng, Shuai; Yu, Lifeng; Yu, Zhicong; Ma, Chi; McCollough, Cynthia, E-mail: mccollough.cynthia@mayo.edu [Department of Radiology, Mayo Clinic, Rochester, Minnesota 55905 (United States)

    2015-12-15

    Purpose: To perform task-based image quality assessment in CT, it is desirable to have a large number of realistic patient images with known diagnostic truth. One effective way of achieving this objective is to create hybrid images that combine patient images with inserted lesions. Because conventional hybrid images generated in the image domain fails to reflect the impact of scan and reconstruction parameters on lesion appearance, this study explored a projection-domain approach. Methods: Lesions were segmented from patient images and forward projected to acquire lesion projections. The forward-projection geometry was designed according to a commercial CT scanner and accommodated both axial and helical modes with various focal spot movement patterns. The energy employed by the commercial CT scanner for beam hardening correction was measured and used for the forward projection. The lesion projections were inserted into patient projections decoded from commercial CT projection data. The combined projections were formatted to match those of commercial CT raw data, loaded onto a commercial CT scanner, and reconstructed to create the hybrid images. Two validations were performed. First, to validate the accuracy of the forward-projection geometry, images were reconstructed from the forward projections of a virtual ACR phantom and compared to physically acquired ACR phantom images in terms of CT number accuracy and high-contrast resolution. Second, to validate the realism of the lesion in hybrid images, liver lesions were segmented from patient images and inserted back into the same patients, each at a new location specified by a radiologist. The inserted lesions were compared to the original lesions and visually assessed for realism by two experienced radiologists in a blinded fashion. Results: For the validation of the forward-projection geometry, the images reconstructed from the forward projections of the virtual ACR phantom were consistent with the images physically

  12. Results of Needs Assessments Related to Citizen Science Projects

    Science.gov (United States)

    Buxner, Sanlyn; Bracey, Georgia; Glushko, Anna; Bakerman, Maya; Gay, Pamela L.; CosmoQuest Team

    2017-01-01

    The CosmoQuest Virtual Research Facility invites the public and classrooms to participate in NASA Science Mission Directorate related research that leads to publishable results and data catalogues. One of the main goals of the project is to support professional scientists in doing science and the general public--including parents, children, teachers, and students--in learning and doing science. Through the effort, the CosmoQuest team is developing a variety of supports and opportunities to support the doing and teaching of science. To inform our efforts, we have implemented a set of needs surveys to assess the needs of our different audiences. These surveys are being used to understand the interests, motivations, resources, challenges and demographics of our growing CosmoQuest community and others interested in engaging in citizen science projects. The surveys include those for teachers, parents, adult learners, planetarium professionals, subject matter experts (SMEs), and the general public. We will share the results of these surveys and discuss the implications of the results for broader education and outreach programs.

  13. Results of the Italian neuART project

    International Nuclear Information System (INIS)

    Re, A; Albertin, F; Brancaccio, R; Cotto, G; Dughera, G; Durisi, E; Ferrarese, W; Lo Giudice, A; Mereu, P; Mila, G; Pastrone, N; Prino, F; Bortolin, C; Corsi, J; Buscaglia, P; Giovagnoli, A; Grassi, N; Nervo, M; Gambaccini, M; Petrucci, F

    2012-01-01

    The neu A RT project aims at developing state of the art transmission imaging and computed tomography techniques, applied to art objects, by using neutrons as well as more conventional X-rays. In this paper a facility for digital X-ray radiography of large area paintings on canvas or wooden panels and for the X-ray tomography of large size wooden artifacts, recently installed in a protected area, is presented. The results of a K-edge radiography facility that will soon be installed in the same area are also shown.

  14. Transaction costs of unilateral CDM projects in India-results from an empirical survey

    International Nuclear Information System (INIS)

    Krey, Matthias

    2005-01-01

    Recently, transaction costs in the context of the Clean Development Mechanism (CDM) gained considerable attention as they were generally perceived to be significantly higher than for the other Kyoto Mechanisms. However, empirical evidence on the amount of transaction costs of CDM projects is very scarce. This paper presents the results from an empirical survey designed to quantify transaction costs of potential non-sink CDM projects in India. The definition of transaction costs of CDM projects was derived from recent literature and observations made in the current market for Certified Emission Reductions (CERs). During the survey, parts of transaction costs of 15 projects were quantified. An assessment of the results showed that specific transaction costs depend, to a large extent, on economies of scale in terms of total amount of CERs generated over the crediting period. Total transaction costs were quantified for seven projects. The costs range from 0.07 to 0.47 dollar/t CO 2 . As the projects have an emission reduction between 0.24 Mt CO 2 and 5.00 Mt CO 2 over the crediting period, the results support the assumption of Michaelowa et al. (Climate Policy 3 (2003) 273) that projects with emission reductions smaller than 0.20 Mt CO 2 are not economically viable at current CER prices

  15. A theory of blindsight--the anatomy of the unconscious: a proposal for the koniocellular projections and intralaminar thalamus.

    Science.gov (United States)

    Vakalopoulos, Costa

    2005-01-01

    This paper extends the concepts introduced by the theory of premotor relations to unconscious cognitive mechanisms. According to the theory conscious mechanisms are associated with behavioural diversity, whereas unconscious output is proposed to have an obligatory association with stereotypical behaviour. The respective processes are by definition a function of the type of reafferent motor input. Concepts of simple and complex premotor networks are introduced as a means of describing unconscious and conscious processes, respectively. Evidence shows that unconscious cognitive performance differs qualitatively from conscious mechanisms suggesting parallel processes. Although the postulated anatomical substrates for conscious and unconscious processes will function in this model as parallel segregated networks, it is proposed they are distributed throughout the same cortical areas of the brain. Motor reafference is postulated to be mediated via pallidal projections to the thalamic reticular nucleus, which is known to modulate thalamocortical pathways. The role of the koniocellular pathway of the lateral geniculate nucleus remains an enigma and has some properties in common with the well-described magnocellular and parvocellular projections. There is also much speculation about the intralaminar and midline nuclei, the so-called non-specific thalamus. The paper will examine the distinctive features of thalamocortical networks and the role of the koniocellular pathway and intralaminar nuclei (ILN) of the thalamus and suggest that they form a neuroanatomical substrate for the categorizing of unconscious cognitive processes. The ILN has unique projections back to the basal ganglia, which could serve in constraining associated neocortical networks with stereotypical behaviour and thus putative unconscious processing. Only after establishing such a theoretical framework can one hope to successfully analyze the empirical literature on the syndrome of blindsight, of which a

  16. Study for Action Plan proposal on some issues of the national nuclear infrastructure for the new research reactor project in phase 1&2

    International Nuclear Information System (INIS)

    Cao Hong Lan; Bui Dang Hanh; Nguyen Nhi Dien

    2017-01-01

    The Project on construction for a new research reactor in Vietnam is under preparation. At the same time, it is necessary to prepare a firm and comprehensive national nuclear infrastructure which is aimed to implement smoothly and ensure safety and security for the project. How is the status of the nuclear infrastructure for research reactor project in Vietnam, how can it be assessed, what is the assessment used for and what are we going to do with that? So, all of these things are the goals set out to address in this Task. However, due to time constraints and conformity with requirement of project progress, this Task assessed only 8 critical issues in infrastructure in phase 1&2, including National position; Management; Legislative framework; Regulatory framework; Human resource development; Radioactive waste; Site survey, site selection and evaluation; and Environmental protection. Conditions and criteria in the documents on milestones and assessment of the national nuclear infrastructure to support a new research reactor project of the International Atomic Energy Agency (IAEA) were used as bases for assessing the Vietnam's infrastructure status. The results of the Task are assessment and identification for gaps which need to be addressed and proposing for a plan on completing the national nuclear infrastructure for the research reactor project on 8 issues in stages 1&2. (author)

  17. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  18. 77 FR 76597 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-12-28

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... issuing certain approvals for the public transportation project listed below. The actions on this project...

  19. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  20. Camera calibration based on the back projection process

    Science.gov (United States)

    Gu, Feifei; Zhao, Hong; Ma, Yueyang; Bu, Penghui

    2015-12-01

    Camera calibration plays a crucial role in 3D measurement tasks of machine vision. In typical calibration processes, camera parameters are iteratively optimized in the forward imaging process (FIP). However, the results can only guarantee the minimum of 2D projection errors on the image plane, but not the minimum of 3D reconstruction errors. In this paper, we propose a universal method for camera calibration, which uses the back projection process (BPP). In our method, a forward projection model is used to obtain initial intrinsic and extrinsic parameters with a popular planar checkerboard pattern. Then, the extracted image points are projected back into 3D space and compared with the ideal point coordinates. Finally, the estimation of the camera parameters is refined by a non-linear function minimization process. The proposed method can obtain a more accurate calibration result, which is more physically useful. Simulation and practical data are given to demonstrate the accuracy of the proposed method.

  1. 78 FR 53001 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-08-27

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  2. 78 FR 23817 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-04-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  3. Project Oriented Immersion Learning: Method and Results

    DEFF Research Database (Denmark)

    Icaza, José I.; Heredia, Yolanda; Borch, Ole M.

    2005-01-01

    A pedagogical approach called “project oriented immersion learning” is presented and tested on a graduate online course. The approach combines the Project Oriented Learning method with immersion learning in a virtual enterprise. Students assumed the role of authors hired by a fictitious publishing...... house that develops digital products including e-books, tutorials, web sites and so on. The students defined the problem that their product was to solve; choose the type of product and the content; and built the product following a strict project methodology. A wiki server was used as a platform to hold...

  4. 77 FR 71475 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-11-30

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before April 29, 2013. FOR... the public transportation projects listed below. The actions on the projects, as well as the laws...

  5. 77 FR 43144 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-07-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before January 21, 2013. FOR... the public transportation projects listed below. The actions on these projects, as well as the laws...

  6. Reconstruction for limited-projection fluorescence molecular tomography based on projected restarted conjugate gradient normal residual.

    Science.gov (United States)

    Cao, Xu; Zhang, Bin; Liu, Fei; Wang, Xin; Bai, Jing

    2011-12-01

    Limited-projection fluorescence molecular tomography (FMT) can greatly reduce the acquisition time, which is suitable for resolving fast biology processes in vivo but suffers from severe ill-posedness because of the reconstruction using only limited projections. To overcome the severe ill-posedness, we report a reconstruction method based on the projected restarted conjugate gradient normal residual. The reconstruction results of two phantom experiments demonstrate that the proposed method is feasible for limited-projection FMT. © 2011 Optical Society of America

  7. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  8. Results of nine Connecticut Cancer Partnership implementation projects.

    Science.gov (United States)

    Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu

    2012-01-01

    The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.

  9. The art of writing good research proposals.

    Science.gov (United States)

    van Ekelenburg, Henk

    2010-01-01

    Whilst scientists are by default motivated by intellectual challenges linked to the area of their interest rather than have an interest in the financial component related to their work, the reality of today is that funding for their work does not come automatically More and more governments provide project-related funding rather than multipurpose funding that covers the total annual costs of a research performing entity (such as a university department). So, like it or not, researchers have to present their research ideas and convince funding bodies about the usefulness and importance of their intended research work. Writing the research proposal is not simply typing words and punctuation. It requires succinctly and clearly chronicling the facts, as well as crafting a convincing line of reasoning for funding the project. For the best result, both the logical, verbal left side of the brain and the intuitive, creative right side of the brain need to work as a team. This article covers the process of writing a proposal, from research idea to submission to the funding body. The key to good writing is linking the text into a logical project flow. Therefore, in the early stage of writing an RTD proposal, developing the chain of reasoning and creating a flow chart is recommended to get a clear overview of the entire project and to visualise how the many work packages are connected.

  10. JRC/IE support activities to PHARE nuclear safety programmes. Dissemination of PHARE project results

    International Nuclear Information System (INIS)

    Ranguelova, V.; Pla, P.; Rieg, C.; Bieth, M.

    2005-01-01

    Nuclear safety in Europe is one of European Union's primary concerns, therefore the European Union decided to take a prominent role to help the New Independent States and countries of Central and Eastern Europe to ensure the safety of their nuclear reactors. The European Union TACIS and PHARE programmes in nuclear safety have been undertaken since 1990. The European Commission's Directorate General External Relations (EC DG RELEX) and, Directorate General Europe Aid Co-operation Office (EC DG AIDCO), are responsible for programming and management of implementation of TACIS projects. Directorate General Enlargement (EC DG ELARG) is responsible for programming PHARE programmes, but implementation of most projects has been decentralised since 1999 budget year to the Beneficiary countries. DG ELARG acts as backstopping for the relevant EC Delegations. In these activities, the TSSTP Unit at the JRC/IE in Petten, The Netherlands, is a technical and scientific adviser of DG RELEX and DG AIDCO and provides support to DG ELARG for very specific technical issues. Several PHARE projects aiming at improving nuclear safety have been successfully implemented for a number of plants from Central and Eastern Europe. In some cases major safety issues have been addressed by means of multi-country projects and results have been disseminated to the rest of the nuclear community. Although a lot of information has been exchanged at a bilateral level, further effort is needed to collect the project results in a systematic way and make them available by means of the internet. At present the TSSTP Unit is implementing two projects for dissemination of PHARE project results. This activity will take a better advantage of today's communication technologies and ensure the management of the acquired knowledge through preservation and user-friendly access and retrieval of the project results. The paper provides an outline of the TSSTP Unit relevant knowledge preservation initiative, a description

  11. Highland Uranium Solution Mining Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1978-05-01

    Exxon Minerals Co. proposes to conduct production-scale solution mining (in situ leaching) of uranium within the existing Highland Operation area in Converse County, Wyoming. The project would result in the temporary removal of 200 acres from grazing and the actual disturbance of 50 acres. About 4500 acre-ft of water will be withdrawn from the ore zone aquifer over the 10-year life of the project. There will be no discharge of liquid effluents from the project; atmospheric effluents will be within acceptable limits. Radiation doses at the nearest ranch resulting from solution mining activities were estimated. The project proposes the production and utilization of 1 to 3 million lb of uranium resources. It will not produce any significant socioeconomic impact on the local area. Alternatives to the project were considered, and conditions for issuing the source material license are listed

  12. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  13. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  14. Position sensitivity of the proposed segmented germanium detectors for the DESPEC project

    International Nuclear Information System (INIS)

    Khaplanov, A.; Tashenov, S.; Cederwall, B.

    2009-01-01

    The DESPEC HPGe array is a part of the NuSTAR project at FAIR, Germany. It is aimed at the spectroscopy of the stopped decaying exotic nuclei. Segmented γ-ray tracking detectors are proposed for this array in order to maximize detection efficiency and background suppression when searching for very rare events. Two types of detector modules-stacks of three 16-fold segmented planar crystals and 12- and 16-fold segmented clover detectors-have been investigated and compared from the point of view of the achievable position resolution using pulse shape analysis (PSA). To this end, detector signals from realistic γ-ray interactions have been calculated. These signals were treated by PSA in order to reconstruct the photon interaction locations. Comparing the initial interaction locations to the reconstructed ones, it was found that the double-sided strip planar detector yielded position reconstruction errors at least a factor 2 lower than the other detectors considered.

  15. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  16. GASB proposes new standards for financial reporting of postemployment benefits by state and local governments.

    Science.gov (United States)

    Johnson, Karl D

    2003-03-01

    GASB has proposed new standards that will affect the way in which governments report postemployment health care benefits in audited external financial statements, resulting in more complete and transparent reporting by employers and plans and more relevant and useful information for the users of governmental financial reports. This article provides an overview of current financial reporting standards and practice, the financial reporting objectives of the project, the proposed measurement approach, noteworthy specific proposals, and the projected timetable for completion of the project and implementation of the new standards.

  17. Antiviral Drug Research Proposal Activity

    Directory of Open Access Journals (Sweden)

    Lisa Injaian

    2011-03-01

    Full Text Available The development of antiviral drugs provides an excellent example of how basic and clinical research must be used together in order to achieve the final goal of treating disease. A Research Oriented Learning Activity was designed to help students to better understand how basic and clinical research can be combined toward a common goal. Through this project students gained a better understanding of the process of scientific research and increased their information literacy in the field of virology. The students worked as teams to research the many aspects involved in the antiviral drug design process, with each student becoming an "expert" in one aspect of the project. The Antiviral Drug Research Proposal (ADRP culminated with students presenting their proposals to their peers and local virologists in a poster session. Assessment data showed increased student awareness and knowledge of the research process and the steps involved in the development of antiviral drugs as a result of this activity.

  18. Proposal for Modified Damage Probability Distribution Functions

    DEFF Research Database (Denmark)

    Pedersen, Preben Terndrup; Hansen, Peter Friis

    1996-01-01

    Immidiately following the Estonia disaster, the Nordic countries establishe a project entitled "Safety of Passenger/RoRo Vessels" As part of this project the present proposal for modified damage stability probability distribution functions has been developed. and submitted to "Sub-committee on st......Immidiately following the Estonia disaster, the Nordic countries establishe a project entitled "Safety of Passenger/RoRo Vessels" As part of this project the present proposal for modified damage stability probability distribution functions has been developed. and submitted to "Sub...

  19. Environmental assessment report on proposed Yeelirrie uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    In accordance with Government requirements, Western Mining Corporation Ltd. has prepared a Draft Environmental Impact Statement/Environmental Review and Management Programme for its proposed uranium mine development at Yeelirrie, Western Australia. This report includes an outline of the proposal, an enviromental assessment, recommendations by the Environmental Protection Authority made after consideration of the Company's draft statement and a review of public and State Government Departmental Submissions received on the Yeelirrie EIS/ERMP

  20. Improving the attractiveness of CDM projects through allowing and incorporating options

    International Nuclear Information System (INIS)

    Carmichael, David G.; Ballouz, Joseph J.; Balatbat, Maria C.A.

    2015-01-01

    The paper puts forward a proposal that, within Clean Development Mechanism (CDM) projects, investors be allowed to benefit from options; this will require a CDM rule change. Through the presence of options, the downside risk resulting from low carbon prices and/or low achieved emission reductions on projects can be limited, while any upside resulting from high carbon prices and/or high achieved emission reductions can be taken advantage of. It is demonstrated that the presence of options improves the financial attractiveness of CDM projects, and this is at no detriment to any stakeholder. The flow-on from the proposal is that more CDM projects should be realisable if options are available, and this in turn will lead to reduced global emissions and improved sustainability. The proposal is supported by the necessary theory and is demonstrated on two registered CDM projects, one on hydropower and one on wind power. - Highlights: • The paper proposes that options be allowed within CDM projects. • Introducing options will require a CDM rule change. • Options improve the financial attractiveness of CDM projects. • Allowing options comes at no cost or detriment to any party. • Allowing options is a win–win situation to both society and the project proponent.

  1. [Review and analysis of the review results of Taiwan nurses association nursing projects (2011~2013)].

    Science.gov (United States)

    Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying

    2015-04-01

    Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of

  2. 15 CFR 917.22 - National Projects funding.

    Science.gov (United States)

    2010-01-01

    ... Projects funding proposals will be expected to address: (1) The relevance of the proposed project to a... projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed... National Projects can be up to 100 percent of the total cost of the project involved. ...

  3. Market trends in the U.S. ESCO industry: Results from the NAESCO database project; TOPICAL

    International Nuclear Information System (INIS)

    Goldman, Charles A.; Osborn, Julie G.; Hopper, Nicole C.; Singer, Terry E.

    2002-01-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective information and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects-the most comprehensive data set of the U.S. ESCO industry available. These projects include$2.55B of work completed by 51 ESCOs and span much of the history of this industry. We estimate that the ESCO industry completed$1.8-2.1B of projects in 2000. The industry has grown rapidly over the last decade with revenues increasing at a 24% annualized rate. We summarize and compare project characteristics and costs and analyze energy savings, including the relationship between predicted and actual savings. ESCOs typically invested about$2.30/ft(sup 2) per project in various energy efficiency improvements, although there is large variation in project costs within and across market segments. We find that lighting-only projects report median electricity savings of 47% of targeted equipment consumption; the median for lighting- and -non-lighting projects is 23% of the total electric bill baseline. We examine project economics, including project net benefits, benefit/cost ratio and simple payback time. Median simple payback time is seven years for institutional sector projects and three years in the private sector. We estimate direct economic benefits of$1.62 billion for the 1080 projects in our database with both cost and savings data. The median benefit/cost ratio is 2.1 for 309 private sector projects and 1.6 for 771 institutional sector projects. We discuss the role of policies and programs adopted by state/federal legislatures and agencies that have played an important role in stimulating ESCO activity

  4. Proposed purchasing, employment and training policies for northern projects

    International Nuclear Information System (INIS)

    1991-09-01

    Manitoba Hydro is about to embark on a major construction project in the northern part of the province. Important considerations involved in this project include purchasing the necessary materials, products, and services, and employing a suitable work force. An outline is presented of draft policies being considered by Manitoba Hydro to enhance northern-aboriginal and northern participation in its future development projects in northern Manitoba. The policies are presented in four sections: purchasing for northern construction and operation activities; training and employment for construction of a generation station and expansion of a converter station; training and employment for construction of a major north-south transmission line; and training and employment for northern operations and maintenance work at existing facilities. Aspects of these policies include giving preference in purchasing to northern and aboriginal businesses, training initiatives and employee counselling for aboriginal employees, and hiring preferences directed toward northern aboriginals and northern residents

  5. Survey of an evaluation method for research and development projects; Kenkyu kaihatsu project no hyoka shuho ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report describes an interim evaluation method and a concrete evaluation method for projects promoted by the Agency of Industrial Science and Technology, and NEDO. As a result of the survey, a method of highly practical interim evaluation, concrete evaluation items, and evaluation criteria have been proposed by assuming that the projects are evaluated by the project evaluation department independent of the project promotion department. Long-term issues for constructing the evaluation system are also described. It is the most essential for the evaluation to fulfill the function of effective promotion of the following projects. It is also indispensable for the evaluation method and issues proposed in this report to communicate closely to project promoters and researchers, and to reassess the projects continuously. Continuous consideration for the feedback of evaluation process and the improvement of evaluation are significant for the long-term construction of system. 21 refs., 9 figs., 23 tabs.

  6. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  7. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  8. Relating cost-benefit analysis results with transport project decisions in the Netherlands

    NARCIS (Netherlands)

    Annema, Jan Anne; Frenken, Koen|info:eu-repo/dai/nl/207145253; Koopmans, Carl; Kroesen, Maarten

    2017-01-01

    This paper relates the cost-benefit analysis (CBA) results of transportation policy proposals in the Netherlands with the decision to implement or abandon the proposal. The aim of this study is to explore the relation between the CBA results and decision-making. Multinomial logit regression models

  9. Relating cost-benefit analysis results with transport project decisions in the Netherlands

    NARCIS (Netherlands)

    Annema, J.A.; Frenken, Koen; Koopmans, Carl; Kroesen, M.

    2017-01-01

    This paper relates the cost-benefit analysis (CBA) results of transportation policy proposals in the Netherlands with the decision to implement or abandon the proposal. The aim of this study is to explore the relation between the CBA results and decision-making. Multinomial logit regression

  10. 77 FR 64586 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-10-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... actions by issuing certain approvals for the public transportation projects listed below. The actions on...

  11. 78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-11-01

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...

  12. 78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-07-26

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...

  13. A proposal to prove compliance of ESD with EU-guidelines

    International Nuclear Information System (INIS)

    Tschurlovits, M.

    2001-01-01

    The question of compliance with the diagnostic reference levels issued as European Guidelines is discussed based upon measurements of entrance surface dose in four selected projections. The projections were chosen either for the higher dose associated with the investigation or the high frequency of the investigation. The results for the high dose projections lumbar spine and iv pyelography were found to be well below the guidelines. The results for the low dose projections chest pa and chest lat show a mean at about the guidance level. The parameters of the measurements are shown and possible reasons for the scattering of data are discussed. The parameters of the measurements are compared with the proposal of the EU. The main conclusion was a) that even when not all parameters are consistent with EU-guides, the dose is frequently much lower than required. In addition, the ranking in ESD was different for different techniques and different radiologists. Because an approved method to indicate compliance is not yet available, a proposal is given in order to make the guidelines executable. (author)

  14. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  15. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. Table - Impacts of the Proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems

    Science.gov (United States)

    This table shows the impacts of the proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems, both with and without the Cross-State Air Pollution Rule.

  17. Q-Sync Motors in Commercial Refrigeration. Preliminary Test Results and Projected Benefits

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, Brian A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Becker, Bryan R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    This report provides background information on various fractional-horsepower electric motor technologies, summarizes initial data from a DOE-sponsored Q-Sync motor demonstration project, and extrapolates that data to project the potential economic and environmental benefits resulting from upgrading the current installed base of 9–12 W evaporator fan motors to Q-Sync motors.

  18. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  19. Implementation of the Hungarian RW management project: Results and lessons

    International Nuclear Information System (INIS)

    Vigassy, J.; Czoch, I.; Ormai, P.

    1995-01-01

    In 1993, a National RW Management Project was launched to solve handling and disposal of LLW/ILW of the Paks Nuclear Power Plant and to elaborate a complex strategy for the management of radwastes from the NPP, including HLW, spent fuel and wastes from the decommissioning. It was intended to implement the project so as to have selected the possible site (or sites) for the LLW/ILW waste repository by 1996. This paper describes the first results of the nation-wide screening for suitable areas and the problems related to the comparative evaluation process to select potential sites for a surface or geological LLW/ILW disposal facility. International tenders were issued to find the most appropriate technology to reduce the quantity of liquid and solid radwaste in the Nuclear Power Plant. Their results will provide a better basis for planning the characteristics and quantity of radwaste. The applications revealed that supercompacting can be ordered as a service when the need arises, and thus it was possible to re-allocate the funding originally foreseen for the equipment to treat solid wastes. Great importance is attached in the Project to public acceptance and PR activity. An expert organization was selected in a two-phase bidding process, and it was decided that detailed exploration of a potential site will take place only if public acceptance is assured. The original program of the Hungarian RW Management Project was extended in 1994 to perform on-site underground investigations (with Canadian support) in a silt-stone formation. The first results confirm that this is a potential site for deep geological disposal of HLW. The financial and legal framework of the RW management is also to be solved. The new law on nuclear energy -- now in preparation -- will deal with that problem in one of its most important chapters, defining the responsibilities for RW management and the sources of funding

  20. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  1. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  2. MODIL cryocooler producibility demonstration project results

    International Nuclear Information System (INIS)

    Cruz, G.E.; Franks, R.M.

    1993-01-01

    The production of large quantities of spacecraft needed by SDIO will require a cultural change in design and production practices. Low rates production and the need for exceedingly high reliability has driven the industry to custom designed, hand crafted, and exhaustively tested satellites. These factors have mitigated against employing design and manufacturing cost reduction methods commonly used in tactical missile production. Additional challenges to achieving production efficiencies are presented by the SDI spacecraft mission requirement. IR sensor systems, for example, are comprised of subassemblies and components that require the design, manufacture, and maintenance of ultra precision tolerances over challenging operational lifetimes. These IR sensors demand the use of reliable, closed loop, cryogenic refrigerators or active cryocoolers to meet stringent system acquisition and pointing requirements. The authors summarize some spacecraft cryocooler requirements and discuss observations regarding Industry's current production capabilities of cryocoolers. The results of the Lawrence Livermore National Laboratory (LLNL) Spacecraft Fabrication and Test (SF and T) MODIL's Phase I producibility demonstration project is presented

  3. An Accurate and Impartial Expert Assignment Method for Scientific Project Review

    Directory of Open Access Journals (Sweden)

    Mingliang Yue

    2017-12-01

    Full Text Available Purpose: This paper proposes an expert assignment method for scientific project review that considers both accuracy and impartiality. As impartial and accurate peer review is extremely important to ensure the quality and feasibility of scientific projects, enhanced methods for managing the process are needed. Design/methodology/approach: To ensure both accuracy and impartiality, we design four criteria, the reviewers’ fitness degree, research intensity, academic association, and potential conflict of interest, to express the characteristics of an appropriate peer review expert. We first formalize the expert assignment problem as an optimization problem based on the designed criteria, and then propose a randomized algorithm to solve the expert assignment problem of identifying reviewer adequacy. Findings: Simulation results show that the proposed method is quite accurate and impartial during expert assignment. Research limitations: Although the criteria used in this paper can properly show the characteristics of a good and appropriate peer review expert, more criteria/conditions can be included in the proposed scheme to further enhance accuracy and impartiality of the expert assignment. Practical implications: The proposed method can help project funding agencies (e.g. the National Natural Science Foundation of China find better experts for project peer review. Originality/value: To the authors’ knowledge, this is the first publication that proposes an algorithm that applies an impartial approach to the project review expert assignment process. The simulation results show the effectiveness of the proposed method.

  4. Review of Interactive Video--Romanian Project Proposal

    Science.gov (United States)

    Onita, Mihai; Petan, Sorin; Vasiu, Radu

    2016-01-01

    In the recent years, the globalization and massification of video education offer involved more and more eLearning scenarios within universities. This article refers to interactive video and proposes an overview of it. We analyze the background information, regarding the eLearning campus used in virtual universities around the world, the MOOC…

  5. Genebanks: a comparison of eight proposed international genetic databases.

    Science.gov (United States)

    Austin, Melissa A; Harding, Sarah; McElroy, Courtney

    2003-01-01

    To identify and compare population-based genetic databases, or "genebanks", that have been proposed in eight international locations between 1998 and 2002. A genebank can be defined as a stored collection of genetic samples in the form of blood or tissue, that can be linked with medical and genealogical or lifestyle information from a specific population, gathered using a process of generalized consent. Genebanks were identified by searching Medline and internet search engines with key words such as "genetic database" and "biobank" and by reviewing literature on previously identified databases such as the deCode project. Collection of genebank characteristics was by an electronic and literature search, augmented by correspondence with informed individuals. The proposed genebanks are located in Iceland, the United Kingdom, Estonia, Latvia, Sweden, Singapore, the Kingdom of Tonga, and Quebec, Canada. Comparisons of the genebanks were based on the following criteria: genebank location and description of purpose, role of government, commercial involvement, consent and confidentiality procedures, opposition to the genebank, and current progress. All of the groups proposing the genebanks plan to search for susceptibility genes for complex diseases while attempting to improve public health and medical care in the region and, in some cases, stimulating the local economy through expansion of the biotechnology sector. While all of the identified plans share these purposes, they differ in many aspects, including funding, subject participation, and organization. The balance of government and commercial involvement in the development of each project varies. Genetic samples and health information will be collected from participants and coded in all of the genebanks, but consent procedures range from presumed consent of the entire eligible population to recruitment of volunteers with informed consent. Issues regarding confidentiality and consent have resulted in opposition to

  6. Michigan Oncology Medical Home Demonstration Project: First-Year Results.

    Science.gov (United States)

    Kuntz, Gordon; Tozer, Jane; Snegosky, Jeff; Fox, John; Neumann, Kurt

    2014-03-01

    The Michigan Oncology Medical Home Demonstration Project (MOMHDP) is an innovative multipractice oncology medical home model, supported by payment reform. Sponsored by Priority Health, Physician Resource Management, and ION Solutions, MOMHDP includes four oncology practices and 29 physicians. Oncology practices used existing technologies, with MOMHDP providing evidence-based treatment guideline selection and compliance tracking, automated physician order entry, a patient portal, symptom management/standardized nurse triage, and advance care planning. To support changes in care and administrative models and to focus on quality, MOMHDP modifies provider payments. The program replaces the average sales price payment methodology with a drug acquisition reimbursement plus a care management fee, calculated to increase total drug reimbursement. Additionally, it reimburses for chemotherapy and treatment planning and advance care planning consultation. There is also a shared savings opportunity. MOMHDP will be enhanced in its second year to include a survivorship program, patient distress screening, imaging guidelines, and standardized patient satisfaction surveys. Priority Health patients receiving chemotherapy for a cancer diagnosis were recruited to the program. Results for this group were compared with a control group of patients from a prior period. In addition to the financial results, the project also accomplished the following: (1) adherence to practice-selected guidelines, (2) institution of advance care planning, (3) effective and standardized symptom management; and (4) payment reform. We have identified a number of critical success factors: strong payer/provider collaboration built on trust through transparent use and cost data; timing of clinical standardization must come from the practices, so they can effectively absorb new approaches; having comprehensive, written program documentation and consistently applied training facilitate practice understanding

  7. Sustainable manure management in the Baltic Sea Region - results, cases and project recommendations

    DEFF Research Database (Denmark)

    Tybirk, Knud; Luostarinen, S; Hamelin, Lorie

    This magazine contains the major results, conclusions and recommendations of the project Baltic Forum for Innovative Technologies for Sustainable Manure Management (Baltic Manure) which via co-funding from Interreg Baltic Sea Region programme has been a Flagship project in the EU Strategy...

  8. Proposal for a project agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2001-01-01

    This document concerns a project agreement with the ISTC entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medecine and Pharmacology" to be executed in co-operation with the Crystal Clear Collaboration. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a project agreement with ISTC for a total amount of 775 000 US dollars. The European Union party in ISTC will co-fund the project up to a total of 525 000 US dollars. CERN's contribution will not exceed 250 000 US dollars. At the present rate of exchange this is equivalent to approximately 430 000 Swiss francs

  9. 75 FR 55598 - Proposed Information Collection; The State of Ecosystem Services Implementation Survey

    Science.gov (United States)

    2010-09-13

    ..., motivations for conducting projects, degree of project implementation, management actions resulting from... Services Implementation. Type of Request: This is a new collection. Affected Public: Individuals who are... DEPARTMENT OF THE INTERIOR U.S. Geological Survey [USGS-8327-CMG61] Proposed Information...

  10. FixO3 project results, legacy and module migration to EMSO

    Science.gov (United States)

    Lampitt, Richard

    2017-04-01

    The fixed point open ocean observatory network (FixO3) project is an international project aimed at integrating in a single network all fixed point open ocean observatories operated by European organisations and to harmonise and coordinate technological, procedural and data management across the stations. The project is running for four years since September 2013 with 29 partners across Europe and a budget of 7M Euros and is now coming to its final phase. In contrast to several past programmes, the opportunity has arisen to ensure that many of the project achievements can migrate into the newly formed European Multidisciplinary Seafloor and water column Observatory (EMSO) research infrastructure. The final phase of the project will focus on developing a strategy to transfer the results in an efficient way to maintain their relevance and maximise their use. In this presentation, we will highlight the significant achievements of FixO3 over the past three years focussing on the modules which will be transferred to EMSO in the coming 9 months. These include: 1. Handbook of best practices for operating fixed point observatories 2. Metadata catalogue 3. Earth Virtual Observatory (EarthVO) for data visualisation and comparison 4. Open Ocean Observatory Yellow Pages (O3YP) 5. Training material for hardware, data and data products used

  11. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  12. The Bioinformatics of Integrative Medical Insights: Proposals for an International Psycho-Social and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International Psycho-Social and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  13. The Bioinformatics of Integrative Medical Insights: Proposals for an International PsychoSocial and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International PsychoSocial and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  14. Evaluation and proposal of improvement for the measurement system in ATLAS

    International Nuclear Information System (INIS)

    Cho, Dong Woo; Kim, Jong Rok; Park, Jun Kwon

    2007-03-01

    The project independently evaluated the validities and reliability of measurement system in ATLAS, then proposed plans to improve the measurement system from evaluated results. For this objectives, we evaluated the design, technical backgrounds, verifying data of measurement system in ATLAS. From this evaluation, we proposed plans for improvement on parts which need improvement

  15. Ranking of small scale proposals for water system repair using the Rapid Impact Assessment Matrix (RIAM)

    Energy Technology Data Exchange (ETDEWEB)

    Shakib-Manesh, T.E.; Hirvonen, K.O.; Jalava, K.J.; Ålander, T.; Kuitunen, M.T., E-mail: markku.kuitunen@jyu.fi

    2014-11-15

    Environmental impacts of small scale projects are often assessed poorly, or not assessed at all. This paper examines the usability of the Rapid Impact Assessment Matrix (RIAM) as a tool to prioritize project proposals for small scale water restoration projects in relation to proposals' potential to improve the environment. The RIAM scoring system was used to assess and rank the proposals based on their environmental impacts, the costs of the projects to repair the harmful impacts, and the size of human population living around the sites. A four-member assessment group (The expert panel) gave the RIAM-scores to the proposals. The assumed impacts of the studied projects at the Eastern Finland water systems were divided into the ecological and social impacts. The more detailed assessment categories of the ecological impacts in this study were impacts on landscape, natural state, and limnology. The social impact categories were impacts to recreational use of the area, fishing, industry, population, and economy. These impacts were scored according to their geographical and social significance, their magnitude of change, their character, permanence, reversibility, and cumulativeness. The RIAM method proved to be an appropriate and recommendable method for the small-scale assessment and prioritizing of project proposals. If the assessments are well documented, the RIAM can be a method for easy assessing and comparison of the various kinds of projects. In the studied project proposals there were no big surprises in the results: the best ranks were received by the projects, which were assumed to return watersheds toward their original state.

  16. Ranking of small scale proposals for water system repair using the Rapid Impact Assessment Matrix (RIAM)

    International Nuclear Information System (INIS)

    Shakib-Manesh, T.E.; Hirvonen, K.O.; Jalava, K.J.; Ålander, T.; Kuitunen, M.T.

    2014-01-01

    Environmental impacts of small scale projects are often assessed poorly, or not assessed at all. This paper examines the usability of the Rapid Impact Assessment Matrix (RIAM) as a tool to prioritize project proposals for small scale water restoration projects in relation to proposals' potential to improve the environment. The RIAM scoring system was used to assess and rank the proposals based on their environmental impacts, the costs of the projects to repair the harmful impacts, and the size of human population living around the sites. A four-member assessment group (The expert panel) gave the RIAM-scores to the proposals. The assumed impacts of the studied projects at the Eastern Finland water systems were divided into the ecological and social impacts. The more detailed assessment categories of the ecological impacts in this study were impacts on landscape, natural state, and limnology. The social impact categories were impacts to recreational use of the area, fishing, industry, population, and economy. These impacts were scored according to their geographical and social significance, their magnitude of change, their character, permanence, reversibility, and cumulativeness. The RIAM method proved to be an appropriate and recommendable method for the small-scale assessment and prioritizing of project proposals. If the assessments are well documented, the RIAM can be a method for easy assessing and comparison of the various kinds of projects. In the studied project proposals there were no big surprises in the results: the best ranks were received by the projects, which were assumed to return watersheds toward their original state

  17. Simultaneous and semi-alternating projection algorithms for solving split equality problems.

    Science.gov (United States)

    Dong, Qiao-Li; Jiang, Dan

    2018-01-01

    In this article, we first introduce two simultaneous projection algorithms for solving the split equality problem by using a new choice of the stepsize, and then propose two semi-alternating projection algorithms. The weak convergence of the proposed algorithms is analyzed under standard conditions. As applications, we extend the results to solve the split feasibility problem. Finally, a numerical example is presented to illustrate the efficiency and advantage of the proposed algorithms.

  18. WIMS library up-date project: first stage results

    International Nuclear Information System (INIS)

    Prati, A.; Claro, L.H.

    1990-01-01

    The following benchmarks: TRX1, TRX2, BAPL-UO sub(2)-1, BAPL-UO sub (2)-2, BAPL-UO sub(2)-3 have been calculated with the WIMSD/4 code, as a contribution of CTA/IEAv, to the first stage of the WIMS Library Update Project, coordinated by the International Atomic Energy Agency. The card image input for each benchmark has been attached and the major input options/parameters are commented. The version of the WIMSD/4 code and its multigroup cross section library used to run the benchmarks are specified. Results from the major integral parameters are presented and discussed. (author)

  19. Common Market measures to promote the use of solar energy - The demonstration project

    Science.gov (United States)

    Kaut, W.

    A series of solar technical projects being conducted under the auspices of the Common Market is discussed. The history and legal foundations of this demonstration project, previous proposal requests and their results, and the experiences to date and present status of the project are assessed. Twenty-six projects proposals are being funded; the only German one concerns solar heating of swimming pools. The economic and administrative aspects of these projects are detailed. Problems of the project are discussed, including the allocation of funds between older and newer aspects and financial constraints.

  20. Blood alcohol test results of motor vehicle deaths as an evaluation method for the Fairfax Alcohol Safety Action Project.

    Science.gov (United States)

    1973-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was started following the June 1971 approval of the proposal and working plan submitted to the Department of Transportation by the Highway Safety Division of Virginia. A total of $2,123,000 was allocat...

  1. Spiral and Project-Based Learning with Peer Assessment in a Computer Science Project Management Course

    Science.gov (United States)

    Jaime, Arturo; Blanco, José Miguel; Domínguez, César; Sánchez, Ana; Heras, Jónathan; Usandizaga, Imanol

    2016-01-01

    Different learning methods such as project-based learning, spiral learning and peer assessment have been implemented in science disciplines with different outcomes. This paper presents a proposal for a project management course in the context of a computer science degree. Our proposal combines three well-known methods: project-based learning,…

  2. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    Science.gov (United States)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  3. Communication dated 22 September 2008 received from the Permanent Mission of Germany to the Agency regarding the German proposal on a Multilateral Enrichment Sanctuary Project

    International Nuclear Information System (INIS)

    2008-01-01

    The Secretariat has received a communication dated 22 September 2008 from the Permanent Mission of Germany, forwarding a paper outlining the German proposal on 'the Multilateral Enrichment Sanctuary Project (MESP)'. As requested in the communication, the paper, entitled 'the Multilateral Enrichment Sanctuary Project (MESP) - a Fresh Look at Ensuring Nuclear Fuel Supply' is circulated herewith for the information of Member States

  4. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  5. Project description and crowdfunding success: an exploratory study.

    Science.gov (United States)

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  6. Proposed shake table studies for NAPP containment

    International Nuclear Information System (INIS)

    Akolkar, P.M.; Khuddus, M.A.

    1975-01-01

    The proposal for shake table studies on model of containment structure of Narora Atomic Power Project is discussed. The physical characteristics such as the dimensions, connection details of the containment with the internal structure and the dynamic interaction between the two have been described. The dynamic scale factors obtained through similitude requirements and dimensional analysis have been presented and the modelling aspects and the choice of model material and scale have been discussed. The proposed type of tests, necessary measurement and instrumentation have been mentioned. The limitations imposed by similitude requirements on model studies are brought out and the usefulness of the results of the proposed tests in the dynamic design of the containment have been covered. (author)

  7. Ecological compensation: From general guidance and expertise to specific proposals for road developments

    International Nuclear Information System (INIS)

    Villarroya, Ana; Persson, Jesper; Puig, Jordi

    2014-01-01

    The main scientific bibliography addressing the rationale behind ecological compensation is reviewed in order to examine general guidelines. This contains interesting general guidance on how to implement compensation, and provides the basis for future developments in compensation practice. On this basis, we propose a further step in compensation practice, advancing compensation proposals or rules for specific kinds of projects and contexts, focusing on road projects in the Spanish Environmental Impact Assessment (EIA). Three main residual impacts of roads are identified which usually remain uncompensated for: the loss of natural and semi-natural land use, the increase in emissions resulting from any new road, and the fragmentation, severance or barrier effect on the landscape and its wildlife. To counteract these, four proposals, or “rules”, are advanced: conservation of natural and semi-natural land use area, conservation of dominant plant species physiognomy, compensation for emissions, and the rule of positive defragmentation. -- Highlights: • Ecological compensation theory does not specify guidelines for types of projects. • EIA practitioners lack valuable specific guidance on how to implement compensation. • Specific guidance for road project ecological compensation is proposed. • Compensation proposals should have in mind present-day compensation practice level. • Specific ways to compensate for habitat loss, emissions, and fragmentation are shown

  8. Ecological compensation: From general guidance and expertise to specific proposals for road developments

    Energy Technology Data Exchange (ETDEWEB)

    Villarroya, Ana, E-mail: avillarroya@alumni.unav.es [Department of Zoology and Ecology, University of Navarra, c/Irunlarrea s/n, 31008 Pamplona, Navarra (Spain); Persson, Jesper, E-mail: jesper.persson@slu.se [Department of Landscape Management, Design and Construction, Swedish University of Agricultural Sciences (SLU), P.O. Box 66, SE-230 53 Alnarp (Sweden); Puig, Jordi, E-mail: jpbaguer@unav.es [Department of Zoology and Ecology, University of Navarra, c/Irunlarrea s/n, 31008 Pamplona, Navarra (Spain)

    2014-02-15

    The main scientific bibliography addressing the rationale behind ecological compensation is reviewed in order to examine general guidelines. This contains interesting general guidance on how to implement compensation, and provides the basis for future developments in compensation practice. On this basis, we propose a further step in compensation practice, advancing compensation proposals or rules for specific kinds of projects and contexts, focusing on road projects in the Spanish Environmental Impact Assessment (EIA). Three main residual impacts of roads are identified which usually remain uncompensated for: the loss of natural and semi-natural land use, the increase in emissions resulting from any new road, and the fragmentation, severance or barrier effect on the landscape and its wildlife. To counteract these, four proposals, or “rules”, are advanced: conservation of natural and semi-natural land use area, conservation of dominant plant species physiognomy, compensation for emissions, and the rule of positive defragmentation. -- Highlights: • Ecological compensation theory does not specify guidelines for types of projects. • EIA practitioners lack valuable specific guidance on how to implement compensation. • Specific guidance for road project ecological compensation is proposed. • Compensation proposals should have in mind present-day compensation practice level. • Specific ways to compensate for habitat loss, emissions, and fragmentation are shown.

  9. Effects of the proposed EPA groundwater standards on the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Titus, F.B.

    1988-01-01

    Potential groundwater contamination beneath the 24 tailings piles that are to be stabilized under the UMTRA Project was intended in early project plans to be minimized by placing disposal piles over thick stratigraphic sequences of tight (minimally permeable) formations, and by designing covers that contained low permeability soil/clay infiltration barriers. The court-ordered revision of the UMTRA groundwater standards by EPA (proposed standards of September 1987) include very low Maximum Concentration Limits (MCLs), which are based mostly on Primary Drinking Water Standards. EPA also mandates that the designs should control radioactivity and hazardous constituents...for up to one thousand years, to the extends reasonably achievable, and, in any case, for at least two hundred years.... In order to accommodate this stipulation, transport modeling of water and contaminants in both the vadose and saturated zones beneath the piles is run until steady state conditions are reached. The early decision to locate stabilized piles over tight formations now exacerbates the problem of complying with the standards, since the contaminants percolate to groundwater that moves only slowly through strata having low permeabilities. Innovative solutions have been evaluated that are aimed at further minimizing long-term infiltration, geochemically fixing contaminants in place before they reach groundwater, or otherwise minimizing contaminant flux

  10. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  11. A landscape project for the coexistence of agriculture and nature: a proposal for the coastal area of a Natura 2000 site in Sicily (Italy

    Directory of Open Access Journals (Sweden)

    Lara Riguccio

    2016-06-01

    Full Text Available Many rural coastal Mediterranean areas suffer from great anthropomorphic pressure. This is due to intensive agriculture, and construction for residential, tourism and industrial uses. The present work investigates the idea of using a landscape project in the Gulf of Gela in South Sicily to recover the dunes and the area behind them. The method used is based on the literature and will evaluate and interpret the dynamics of the landscape, so as to draw up a landscape plan, which can be used to help sustain the assets of the area, in a way, which is compatible with conserving nature. This method was tested in the LIFE11-Leopoldia project, funded by the European Union. The results of the study form part of the landscape project. This project is aimed at connecting the different productive zones in the area, protecting the natural environments and the rural historical patrimony, through combining the modern road networks with the older slower, historic infrastructure. Three different levels of landscape management are proposed: total protection (the dunes, high-level protection (the area behind the dunes where traditional agriculture is practised, buffer areas and ecological connecting areas, medium levels of protection (sustainable agriculture, green connections and ecological corridors. The key aims of the project are as follows: transversality - repairing the agricultural fabric and the relationship between the land and the sea; sustainability - recovering the environmental system and traditional activities; flexibility - agriculture with only minor environmental impact.

  12. Computing with words to feasibility study of software projects

    Directory of Open Access Journals (Sweden)

    Marieta Peña Abreu

    2017-02-01

    Full Text Available Objective: This paper proposes a method to analyze the technical, commercial and social feasibility of software projects in environments of uncertainty. It allows working with multiple experts and multiple criteria and facilitates decision-making. Method: The proposal contains two phases, first the necessary information is collected and in second place projects are evaluated using 2-tuple linguistic representation model. The experts are selected by analyzing their curricular synthesis. The evaluation criteria are defined using the technique Focus Group and weighted in the interval (0,1 according to their importance. three domains are offered to express the preferences: numeric, interval-valued and linguistic. For aggregation extended arithmetic mean and weighted average extended are used, preventing the loss of information. A 2-tuple (feasibility, precision is obtained as a result for each project. Results: The evaluation of P1 project was a very high feasibility with -0,33 of precision. The P2 project obtained a high feasibility with 0,38 of precision and P3 project achieved a medium feasibility with -0,21 of precision. Conclusions: This method is favorable for software projects feasibility analysis with presence of multiple experts and criteria, in environments of uncertainty. It tries heterogeneous assessments without loss of information. Their results are consistent and useful for decision makers.

  13. Exploring the uncertainties of early detection results: model-based interpretation of mayo lung project

    Directory of Open Access Journals (Sweden)

    Berman Barbara

    2011-03-01

    Full Text Available Abstract Background The Mayo Lung Project (MLP, a randomized controlled clinical trial of lung cancer screening conducted between 1971 and 1986 among male smokers aged 45 or above, demonstrated an increase in lung cancer survival since the time of diagnosis, but no reduction in lung cancer mortality. Whether this result necessarily indicates a lack of mortality benefit for screening remains controversial. A number of hypotheses have been proposed to explain the observed outcome, including over-diagnosis, screening sensitivity, and population heterogeneity (initial difference in lung cancer risks between the two trial arms. This study is intended to provide model-based testing for some of these important arguments. Method Using a micro-simulation model, the MISCAN-lung model, we explore the possible influence of screening sensitivity, systematic error, over-diagnosis and population heterogeneity. Results Calibrating screening sensitivity, systematic error, or over-diagnosis does not noticeably improve the fit of the model, whereas calibrating population heterogeneity helps the model predict lung cancer incidence better. Conclusions Our conclusion is that the hypothesized imperfection in screening sensitivity, systematic error, and over-diagnosis do not in themselves explain the observed trial results. Model fit improvement achieved by accounting for population heterogeneity suggests a higher risk of cancer incidence in the intervention group as compared with the control group.

  14. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  15. Projected impacts of federal tax policy proposals on mortality burden in the United States: A microsimulation analysis.

    Science.gov (United States)

    Kim, Daniel

    2018-06-01

    The public health consequences of federal income tax policies that influence income inequality are not well understood. I aimed to project the impacts on mortality of modifying federal income tax structures based on proposals by two recent United States (U.S.) Presidential candidates: Donald Trump and Senator Bernie Sanders. I performed a microsimulation analysis using the latest U.S. Internal Revenue Service public-use tax file with state identifiers (2008 tax year), containing nationally-representative data from 139,651 tax returns. I considered five tax plan scenarios: 1) actual 2008 tax structures; proposals in 2016 by then-candidates 2) Trump and 3) Sanders; 4) a modified Sanders plan with higher top tax rates (75%); and 5) a modified Sanders plan with higher top rates plus revenue redistribution to lower-income households (Trump and Sanders plans, respectively. Under the modified Sanders plan including higher top rates, 68,919 (95% CI: 25,221-113,561) fewer deaths/year are projected. Under the modified Sanders plan with redistribution, 333,504 (95% CI: 192,897-473,787) fewer deaths/year are expected. Policies that both raise federal income tax rates and redistribute tax revenue could confer large reductions in the total number of annual deaths among Americans. In this era of high income inequality and growing public support to address the rich-poor gap, policymakers should consider joint federal tax and redistributive policies as levers to reduce the burden of mortality in the United States. Copyright © 2017 The Author. Published by Elsevier Inc. All rights reserved.

  16. The ability to manage self-proposed projects between 1;3 and 2;0 years old: a study of inhibition and resistance to interference

    OpenAIRE

    Estanislao Pastor-Mallol; Edith Santó-Rañé

    2015-01-01

    This study examines very young children's ability to manage self-proposed projects by using the inhibitory function and resistance to interference. In a natural environment and using an observational method, we conducted a longitudinal study of a sample observed at 1;3, 1;6, 1;9 and 2;0 years old. The research was divided into two studies which followed different procedures and looked at the projects carried out, the interferences produced and the functioning of inhibition. We observed signif...

  17. The Project

    DEFF Research Database (Denmark)

    Brabrand, Claus; Møller, Anders; Schwartzbach, Michael Ignatieff

    2002-01-01

    concurrency control, and it proposes syntax macros for making highly domain-specific languages. The language is implemented via widely available Web technologies, such as Apache on the server-side and JavaScript and Java Applets on the client-side. We conclude with experience and evaluation of the project.......We present the results of the project, which aims to design and implement a high-level domain-specific language for programming interactive Web services. A fundamental aspect of the development of the World Wide Web during the last decade is the gradual change from static to dynamic generation...

  18. InPhoCUS (Inflated Photovoltaic Ultra-light Mirror Concentrators): First Results Of The Project And Future Perspectives

    Science.gov (United States)

    Pravettoni, Mauro; Barbato, Maurizio; Cooper, Thomas; Pedretti, Andrea; Ambrosetti, Gianluca; Steinfeld, Aldo

    2011-12-01

    InPhoCUS (Inflated PhotovoltaiC Ultra-light mirror concentratorS) is a concentrating photovoltaic (CPV) project funded by the Swiss Confederation's Innovation Promotion Agency (CTI) and developed by Airlight Energy Holding SA, the University of Applied Sciences and Arts of Southern Switzerland and the Swiss Federal Institute of Technology. The proposed novel concentrating system has already been patented for concentrated solar power applications: it is made by unconventional pneumatic multilayer polymeric mirrors, has an innovative fibre-reinforced concrete structure and an original tilting mechanism to track the sun. The innovative CPV solar collector is profitable for electric power plants both for the sun-belt region and in the Mediterranean. In this paper the authors present the novel CPV system and preliminary results on cost analysis, optical design and thermal modelling.

  19. HYRESS project. Study case of Tunisia. Installation, set-up and first results

    Energy Technology Data Exchange (ETDEWEB)

    Cendagorta, M.; Friend, M.; Lopez-Manzanares, L.; Rodriguez, J. [Poligono Industrial de Granadilla, Tenerife (Spain). Inst. Tecnologico y de Energias Renovables, S.A.; El Khazen, A. [Agence Nationale pour la Maitrise de l' Energie, Tunis (Tunisia); Linares, A.

    2010-07-01

    In the framework of the HYRESS project, a minigrid has been designed and installed at the village of Ksar Ghilene, in southern Tunisia. This project, developed from the perspective of knowledge transfer, will allow the installation of an underground minigrid during the trimester of 2010. STEG, Tunisian national electricity supplier, will finish civil works by May 2010. It is expected to have first results of system behaviour by the end of May or April 2010. (orig.)

  20. 78 FR 42027 - Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements

    Science.gov (United States)

    2013-07-15

    ... Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements AGENCY: Employee... illustrations given to participants in defined contribution pension plans, such as 401(k) and 403(b) plans. The... Labor, 200 Constitution Avenue NW., Washington, DC 20210, Attention: Pension Benefit Statements Project...

  1. Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: A dynamic forward approach

    Directory of Open Access Journals (Sweden)

    Aidin Delgoshaei

    2016-09-01

    Full Text Available Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to be useless. Modifying an over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a new and fast tracking method is proposed to schedule large scale projects which can help project engineers to schedule the project rapidly and with more confidence. Design/methodology/approach: In this article, a forward approach for maximizing net present value (NPV in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF is proposed. The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in forward mode. For this purpose, a Genetic Algorithm is applied to solve. Findings: The findings show that the proposed method is an effective way to maximize NPV in MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The results are then compared with branch and bound method and simulated annealing algorithm and it is found the proposed genetic algorithm can provide results with better quality. Then algorithm is then applied for scheduling a hospital in practice. Originality/value: The method can be used alone or as a macro in Microsoft Office Project® Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities after scheduling a project. This can help project engineers to schedule project activities rapidly with more accuracy in practice.

  2. Wetland and Sensitive Species Survey Report for Y-12: Proposed Uranium Processing Facility (UPF)

    Energy Technology Data Exchange (ETDEWEB)

    Giffen, N.; Peterson, M.; Reasor, S.; Pounds, L.; Byrd, G.; Wiest, M. C.; Hill, C. C.

    2009-11-01

    This report summarizes the results of an environmental survey conducted at sites associated with the proposed Uranium Processing Facility (UPF) at the Y-12 National Security Complex in September-October 2009. The survey was conducted in order to evaluate potential impacts of the overall project. This project includes the construction of a haul road, concrete batch plant, wet soil storage area and dry soil storage area. The environmental surveys were conducted by natural resource experts at ORNL who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). Natural resource staff assistance on this project included the collection of environmental information that can aid in project location decisions that minimize impacts to sensitive resource such as significant wildlife populations, rare plants and wetlands. Natural resources work was conducted in various habitats, corresponding to the proposed areas of impact. Thc credentials/qualifications of the researchers are contained in Appendix A. The proposed haul road traverses a number of different habitats including a power-line right-of-way. wetlands, streams, forest and mowed areas. It extends from what is known as the New Salvage Yard on the west to the Polaris Parking Lot on the east. This haul road is meant to connect the proposed concrete batch plant to the UPF building site. The proposed site of the concrete batch plant itself is a highly disturbed fenced area. This area of the project is shown in Fig. 1. The proposed Wet Soils Disposal Area is located on the north side of Bear Creek Road at the former Control Burn Study Area. This is a second growth arce containing thick vegetation, and extensive dead and down woody material. This area of the project is shown in Fig. 2. Thc dry soils storage area is proposed for what is currently known as the West Borrow Area. This site is located on the west side of Reeves Road south of Bear Creek Road. The site is an early successional

  3. Robust function projective synchronization of a class of uncertain chaotic systems

    International Nuclear Information System (INIS)

    Shen Liqun; Liu Wanyu; Ma Jianwei

    2009-01-01

    In this paper, the function projective synchronization problem of chaotic systems is investigated, where parameter mismatch exists between the drive system and the response system. Based on Lyapunov stability theory, a novel robust function projective synchronization scheme is proposed. And the parameter mismatch problem is also solved. Simulation results of Lorenz system and Chen system verify the effectiveness of the proposed control scheme.

  4. VALUES-ORIENTED PROJECT MANAGEMENT OF RENEWABLE ENERGY

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2017-03-01

    Full Text Available The value-oriented approach to project management of renewable energy based on classification stage of the life cycle of products of the projects, adapted to the goals and objectives of information modeling, which allowed to formulate stricter requirements information models used at different stages of the power plant is proposed. A classification of the alternative energy projects, which highlighting areas for activities is proposed. The list of stakeholders that have an impact on alternative energy projects and presented their classification is defined. The value of alternative energy projects considered from the standpoint of a utilitarian approach, using the concept of utility and on the basis of this concept proposed classification values of alternative energy projects. Criteria values as indicators for assessing the value of alternative energy projects and their weights determined by pairwise comparison. To take into account the changes of the value criteria over time proposed to use the key control points value, assessed value criteria in various key points of control, defined indicator of the total value of alternative energy projects. The classification of risks and tools for value-oriented risk management in alternative energy projects is proposed. Further study authors plan to link the development of mechanisms for harmonization value alternative energy projects for their stakeholders.

  5. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project, UAS Control and Non-Payload Communication System Phase-1 Flight Test Results

    Science.gov (United States)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the prototype radio development, and results from phase 1 flight tests conducted during 2013.

  6. [Strategies for improving care of oncologic patients: SHARE Project results].

    Science.gov (United States)

    Reñones Crego, María de la Concepción; Fernández Pérez, Dolores; Vena Fernández, Carmen; Zamudio Sánchez, Antonio

    2016-01-01

    Cancer treatment is a major burden for the patient and its family that requires an individualized management by healthcare professionals. Nurses are in charge of coordinating care and are the closest healthcare professionals to patient and family; however, in Spain, there are not standard protocols yet for the management of oncology patients. The Spanish Oncology Nursing Society developed between 2012 and 2014 the SHARE project, with the aim of establishing strategies to improve quality of life and nursing care in oncology patients. It was developed in 3 phases. First, a literature search and review was performed to identify nursing strategies, interventions and tools to improve cancer patients' care. At the second stage, these interventions were agreed within a group of oncology nursing experts; and at the third phase, a different group of experts in oncology care categorized the interventions to identify the ones with highest priority and most feasible to be implemented. As a result, 3 strategic actions were identified to improve nursing care during cancer treatment: To provide a named nurse to carry out the follow up process by attending to the clinic or telephonic consultation, develop therapeutic education with adapted protocols for each tumor type and treatment and ensure specific training for nurses on the management of the cancer patients. Strategic actions proposed in this paper aim to improve cancer patients' healthcare and quality of life through the development of advanced nursing roles based on a higher level of autonomy, situating nurses as care coordinators to assure an holistic care in oncology patients. Copyright © 2016 Elsevier España, S.L.U. All rights reserved.

  7. 76 FR 1619 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2011-01-11

    ... SACWIS Assessment Reviews, at any time in the system life cycle. Submission of the SACWIS SARG and other...-0159] Proposed Information Collection Activity; Comment Request Proposed Projects Title: Statewide... the project, as described in the approved Advance Planning Document, have been adequately completed...

  8. Community College Economics Instruction: Results from a National Science Foundation Project

    Science.gov (United States)

    Maier, Mark; Chi, W. Edward

    2016-01-01

    The principal investigator of a National Science Foundation project, "Economics at Community Colleges," surveyed community college economics faculty and organized workshops, webinars, and regional meetings to address community college faculty isolation from new ideas in economics and economics instruction. Survey results, combined with…

  9. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  10. [How do Prevention Projects Reach their Target Groups? Results of a Survey with Prevention Projects].

    Science.gov (United States)

    Brand, T; Böttcher, S; Jahn, I

    2015-12-01

     The aim of this study was to assess methods used to access target groups in prevention projects funded within the prevention research framework by the German Federal Ministry of Education and Research.  A survey with prevention projects was conducted. Access strategies, communication channels, incentives, programme reach, and successful practical recruitment strategies were explored.  38 out of 60 projects took part in the survey. Most projects accessed their target group within structured settings (e. g., child day-care centers, schools, workplaces). Multiple communication channels and incentives were used, with written information and monetary incentives being used most frequently. Only few projects were able to report their programme reach adequately; programme reach was highest for programmes accessing the target groups in structured settings. The respondents viewed active recruitment via personal communication with the target group and key persons in the settings as the most successful strategy.  The paper provides an overview on recruitment strategies used in current preven-tion projects. More systematic research on programme reach is necessary. © Georg Thieme Verlag KG Stuttgart · New York.

  11. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  12. Generic Community System Specification: A Proposed Format for Reporting the Results of Microgrid Optimization Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, Antonio [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-14

    This document provides a proposed format for reporting the results of microgrid optimization analysis. While the proposed format assumes that the modeling is conducted as part of a renewable energy retrofit of an existing diesel micro-grid, the format can certainly be adopted for other situations.

  13. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes

  14. Projected entrainment of fish resulting from aggregate dredging

    International Nuclear Information System (INIS)

    Drabble, Ray

    2012-01-01

    Previous research to assess impacts from aggregate dredging has focussed on infaunal species with few studies made of fish entrainment. Entrainment evidence from hydraulic dredging studies is reviewed to develop a sensitivity index for benthic fish. Environmental monitoring attendant with the granting of new licences in the Eastern Channel Region (ECR) in 2006 offers a unique opportunity to assess the effects of dredging upon fish. Projected theoretical fish entrainment rates are calculated based upon: abundance data from 4m beam trawl sampling of fish species over the period 2005–2008; sensitivity data; and dredging activity and footprint derived from Electronic monitoring System (EMS) data. Results have been compared with actual entrainment rates and also against summary results from independent analysis of the changes in fish population over the period 2005–2008 (). The case is made for entrainment surveys to form part of impact monitoring for marine aggregate dredging.

  15. Advanced Bimanual Manipulation Results from the DEXMART Project

    CERN Document Server

    2012-01-01

    Dexterous and autonomous manipulation is a key technology for the personal and service robots of the future. Advances in Bimanual Manipulation edited by Bruno Siciliano provides the robotics community with the most noticeable results of the four-year European project DEXMART (DEXterous and autonomous dual-arm hand robotic manipulation with sMART sensory-motor skills: A bridge from natural to artificial cognition). The volume covers a host of highly important topics in the field, concerned with modelling and learning of human manipulation skills, algorithms for task planning, human-robot interaction, and grasping, as well as hardware design of dexterous anthropomorphic hands. The results described in this five-chapter collection are believed to pave the way towards the development of robotic systems endowed with dexterous and human-aware dual-arm/hand manipulation skills for objects, operating with a high degree of autonomy in unstructured real-world environments.

  16. New Results from the DREAM project

    International Nuclear Information System (INIS)

    Meoni, E.

    2011-01-01

    Dual-Readout calorimetry is a promising new technique for high precision measurements of hadronic showers and jets. The DREAM Collaboration is exploiting the possibilities offered by this technique, a key aspect of which is the simultaneous measurement of the scintillation light and the Cerenkov light generated in the shower development process. By comparing these two signals, the electromagnetic shower fraction can be measured event by event, eliminating the effects of its fluctuations, that are the dominant contribution to the hadronic energy resolution. In the first detector of this type the two signals were provided by two independent active media: scintillating fibers and quartz fibers. In follow-up studies, we have explored the possibilities of heavy crystals such as BGO and PbWO4. The use of homogeneous detectors has the advantage that it eliminates the effects of fluctuations that limit the resolution of the fiber calorimeter: sampling fluctuations and quantum fluctuations in the Cerenkov signals. A very important tool turnes out to be a detailed measurement of the time structure of the signals. In this paper, the latest results of this project will be presented.

  17. FP7 Project LONGLIFE: Overview of results and implications

    International Nuclear Information System (INIS)

    Altstadt, Eberhard; Keim, Elisabeth; Hein, Hieronymus; Serrano, Marta; Bergner, Frank; Viehrig, Hans-Werner; Ballesteros, Antonio; Chaouadi, Rachid; Wilford, Keith

    2014-01-01

    Highlights: • Radiation effects in reactor pressure vessel steels under long term operation. • Indications of late blooming effects were found in some cases. • Significant flux effect on the size of defect clusters in high-Cu weld materials. • Guideline for monitoring radiation embrittlement during life extension. - Abstract: LONGLIFE (“Treatment of long term irradiation embrittlement effects in RPV safety assessment”) was a collaborative project of the 7th Framework Programme of EURATOM under the umbrella of NULIFE/NUGENIA, aiming at an improved understanding of irradiation effects in reactor pressure vessel steels under conditions representative of long term operation. The LONGLIFE project was completed by the end of January 2014. The paper gives an overview of the main project results and their implications for future research, as discussed at the final project workshop. The microstructural database for neutron-irradiated RPV steels was extended considerably and existing gaps on mechanical property data were closed. Indications of late blooming effects (LBE) were found in some cases, but clear criteria for the occurrence/exclusion in terms of irradiation conditions and chemical composition have still to be developed. The commonly accepted trend, that low flux and low irradiation temperature promotes LBE, is supported. A significant flux effect on the size of defect clusters was observed in two high Cu weld materials, while the changes of mechanical properties are not affected by the neutron flux. The database requires completion in particular for low-Cu RPV steels. The shift of reference temperature T 0 over the thickness location of a VVER-440 welding seam does not follow the prediction Russian code, because of the strong variation of the intrinsic weld bead structure. Therefore, the effect of the initial microstructure and of the heterogeneity on the radiation behaviour has to be addressed in future works. Existing embrittlement trend curves models

  18. The VIRGO project

    International Nuclear Information System (INIS)

    Yvert, M.

    1991-01-01

    The detection of gravitational waves is, nowadays, technologically possible. The Virgo project, proposed by a French-Italian collaboration, is now on the verge of being fully approved and funded. The goal of the Virgo project is, first, to detect gravitational waves. The next will be to perform, in conjunction with other similar detectors, more precise measurements (i.e. the spin of the graviton) and start gravitational wave astrophysical observations. The method is proposed to use a large Michelson interferometer as a detector. The main motivations, characteristics and expected sensitivity of this project are described. (R.P.) 14 refs., 6 figs

  19. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  20. A proposed programme for energy risk research

    International Nuclear Information System (INIS)

    1979-01-01

    The report consists of two parts. Part I presents an overview of technological risk management, noting major contributions and current research needs. Part II details a proposed program of energy research, including discussions of some seven recommended projects. The proposed energy risk research program addresses two basic problem areas: improving the management of energy risks and energy risk communication and public response. Specific recommended projects are given for each. (Auth.)

  1. Lunar scout: A Project Artemis proposal

    Science.gov (United States)

    The results of a student project to design a lunar lander in the context of a specifically defined mission are presented. The Lunar Scout will be launched from Cape Canaveral, Florida onboard a Delta II launch vehicle. The Delta II will carry the lander and its payload to a 1367 km orbit. Once it reaches that altitude, a STAR 48A solid rocket motor will kick the spacecraft into a lunar trajectory. After burnout of the lunar insertion motor, it will be jettisoned from the spacecraft. The flight from the earth to the moon will take approximately 106.4 hours. During this time the battery, which was fully charged prior to launch, will provide all power to the spacecraft. Every hour, the spacecraft will use its sun sensors and star trackers to update its position, maintain some stabilization and relay it back to earth using the dipole antennas. At the start of its lunar trajectory, the spacecraft will fire one of its 1.5 N thrusters to spin in at a very small rate. The main reason for this is to prevent one side of the spacecraft from overheating in the sun. When the spacecraft nears the moon, it will orient itself for the main retro burn. At an altitude of 200 km, a 4400 N bipropellant liquid thruster will ignite to slow the spacecraft. During the burn, the radar altimeter will be turned on to guide the spacecraft. The main retro rocket will slow the lander to 10 m/s at an approximate altitude of 40 km above the moon. From there, the space craft will use four 4.5 N hydrazine vertical thrusters and 1.5 N horizontal thrusters to guide the spacecraft to a soft landing. Once on the ground, the lander will shutoff the radar and attitude control systems. After the debris from the impact has settled, the six solar panels will be deployed to begin recharging the batteries and to power up the payload. The feedhorn antenna will then rotate to fix itself on the earth.

  2. INSPIRE Project (IoNospheric Sounding for Pre-seismic anomalies Identification REsearch): Main Results and Future Prospects

    Science.gov (United States)

    Pulinets, S. A.; Andrzej, K.; Hernandez-Pajares, M.; Cherniak, I.; Zakharenkova, I.; Rothkaehl, H.; Davidenko, D.

    2017-12-01

    The INSPIRE project is dedicated to the study of physical processes and their effects in ionosphere which could be determined as earthquake precursors together with detailed description of the methodology of ionospheric pre-seismic anomalies definition. It was initiated by ESA and carried out by international consortium. The physical mechanisms of the ionospheric pre-seismic anomalies generation from ground to the ionosphere altitudes were formulated within framework of the Lithosphere-Atmosphere-Ionosphere-Magnetosphere Coupling (LAIMC) model (Pulinets et al., 2015). The general algorithm for the identification of the ionospheric precursors was formalized which also takes into account the external Space Weather factors able to generate the false alarms. Importance of the special stable pattern called the "precursor mask" was highlighted which is based on self-similarity of pre-seismic ionospheric variations. The role of expert decision in pre-seismic anomalies interpretation for generation of seismic warning is important as well. The algorithm performance of the LAIMC seismo-ionospheric effect detection module has been demonstrated using the L'Aquila 2009 earthquake as a case study. The results of INSPIRE project have demonstrated that the ionospheric anomalies registered before the strong earthquakes could be used as reliable precursors. The detailed classification of the pre-seismic anomalies was presented in different regions of the ionosphere and signatures of the pre-seismic anomalies as detected by ground and satellite based instruments were described what clarified methodology of the precursor's identification from ionospheric multi-instrumental measurements. Configuration for the dedicated multi-observation experiment and satellite payload was proposed for the future implementation of the INSPIRE project results. In this regard the multi-instrument set can be divided by two groups: space equipment and ground-based support, which could be used for real

  3. Proposal for a EU quality label for aerospace education

    NARCIS (Netherlands)

    Bernelli-Zazzera, Franco; Angeles, Maria; Prats, Martin; Marulo, Francesco; Hanus, Daniel; Melkert, J.A.; Guglieri, Giorgio; Bauer, Pascal; Pantelaki, Irene; Wasser, Iring; Deconinck, Herman; Bosilca, Ruxandra; Saari, Hanna-Kaisa; Gherman, B.; Porumbel, I.

    2018-01-01

    The paper presents a possible roadmap for the definition of a European quality label for aerospace related higher education degrees. The proposal is the result of a two-years long Horizon 2020 project that has involved a great portion of the European stakeholders in aerospace: Universities, research

  4. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  5. COGNITIVE MODELING AS A METHOD OF QUALITATIVE ANALYSIS OF IT PROJECTS

    Directory of Open Access Journals (Sweden)

    Інна Ігорівна ОНИЩЕНКО

    2016-03-01

    Full Text Available The example project implementing automated CRM-system demonstrated the possibility and features of cognitive modeling in the qualitative analysis of project risks to determine their additional features. Proposed construction of cognitive models of project risks in information technology within the qualitative risk analysis, additional assessments as a method of ranking risk to characterize the relationship between them. The proposed cognitive model reflecting the relationship between the risk of IT project to assess the negative and the positive impact of certain risks for the remaining risks of project implementation of the automated CRM-system. The ability to influence the risk of a fact of other project risks can increase the priority of risk with low impact on results due to its relationship with other project risks.

  6. Lesion insertion in the projection domain: Methods and initial results.

    Science.gov (United States)

    Chen, Baiyu; Leng, Shuai; Yu, Lifeng; Yu, Zhicong; Ma, Chi; McCollough, Cynthia

    2015-12-01

    To perform task-based image quality assessment in CT, it is desirable to have a large number of realistic patient images with known diagnostic truth. One effective way of achieving this objective is to create hybrid images that combine patient images with inserted lesions. Because conventional hybrid images generated in the image domain fails to reflect the impact of scan and reconstruction parameters on lesion appearance, this study explored a projection-domain approach. Lesions were segmented from patient images and forward projected to acquire lesion projections. The forward-projection geometry was designed according to a commercial CT scanner and accommodated both axial and helical modes with various focal spot movement patterns. The energy employed by the commercial CT scanner for beam hardening correction was measured and used for the forward projection. The lesion projections were inserted into patient projections decoded from commercial CT projection data. The combined projections were formatted to match those of commercial CT raw data, loaded onto a commercial CT scanner, and reconstructed to create the hybrid images. Two validations were performed. First, to validate the accuracy of the forward-projection geometry, images were reconstructed from the forward projections of a virtual ACR phantom and compared to physically acquired ACR phantom images in terms of CT number accuracy and high-contrast resolution. Second, to validate the realism of the lesion in hybrid images, liver lesions were segmented from patient images and inserted back into the same patients, each at a new location specified by a radiologist. The inserted lesions were compared to the original lesions and visually assessed for realism by two experienced radiologists in a blinded fashion. For the validation of the forward-projection geometry, the images reconstructed from the forward projections of the virtual ACR phantom were consistent with the images physically acquired for the ACR

  7. Variances in the projections, resulting from CLIMEX, Boosted Regression Trees and Random Forests techniques

    Science.gov (United States)

    Shabani, Farzin; Kumar, Lalit; Solhjouy-fard, Samaneh

    2017-08-01

    The aim of this study was to have a comparative investigation and evaluation of the capabilities of correlative and mechanistic modeling processes, applied to the projection of future distributions of date palm in novel environments and to establish a method of minimizing uncertainty in the projections of differing techniques. The location of this study on a global scale is in Middle Eastern Countries. We compared the mechanistic model CLIMEX (CL) with the correlative models MaxEnt (MX), Boosted Regression Trees (BRT), and Random Forests (RF) to project current and future distributions of date palm ( Phoenix dactylifera L.). The Global Climate Model (GCM), the CSIRO-Mk3.0 (CS) using the A2 emissions scenario, was selected for making projections. Both indigenous and alien distribution data of the species were utilized in the modeling process. The common areas predicted by MX, BRT, RF, and CL from the CS GCM were extracted and compared to ascertain projection uncertainty levels of each individual technique. The common areas identified by all four modeling techniques were used to produce a map indicating suitable and unsuitable areas for date palm cultivation for Middle Eastern countries, for the present and the year 2100. The four different modeling approaches predict fairly different distributions. Projections from CL were more conservative than from MX. The BRT and RF were the most conservative methods in terms of projections for the current time. The combination of the final CL and MX projections for the present and 2100 provide higher certainty concerning those areas that will become highly suitable for future date palm cultivation. According to the four models, cold, hot, and wet stress, with differences on a regional basis, appears to be the major restrictions on future date palm distribution. The results demonstrate variances in the projections, resulting from different techniques. The assessment and interpretation of model projections requires reservations

  8. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  9. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  10. Solution Proposals for Japan-Oriented Offshore Software Development in China

    Science.gov (United States)

    Zhang, Lei; Zhang, Xuan; Chai, Meiping; Tan, Yibing; Miyake, Shigeru; Taniguchi, Yoji; Hosoya, Jun; Mibe, Ryota

    Surveys on the Japan-oriented vendors in China were conducted twice to find out the existent problems in the Japan-oriented offshore software development. From these survey results, four main problems were found out, which were the frequent requirement changes from the product owner, the misunderstanding of the requirement specification in the vendor side, the heavy overhead of the project management and the low-efficiency communication between the product owner and the vendor. Several solutions are proposed to solve these four problems, which mainly consist of the improvement of the offshore software development process and the development of the offshore development supporting tools. The proposed offshore development process is based on the application of the prototype development, the iteration development and the customer test driven development processes. The proposed offshore development supporting tools include the project management assistant tool and the communication assistant tool.

  11. HAD 2020 Project: A proposal to consolidate hospital-based home care in Spain

    Directory of Open Access Journals (Sweden)

    Oriol Estrada Cuxart

    2017-04-01

    Full Text Available Hospital at home (HAH appeared in Spain 36 years ago with the opening of several units. The initial push was truncated by the lack of political leadership and sometimes clinical as well. The current reality offers an irregular implementation with a wide disparity of assistance and resource models. The Sociedad Española de Hospitalización a Domicilio (SEHAD has not played either the expected scientific or professional leadership roles. The “Plan HAD2020: key of the future” was designed as revulsive. This is an ambitious 4-year project to consolidate HAH as a care modality. Its deployment consists of five phases. Preparation: the foundations of the strategic plan (EP were established. Situation analysis: a national survey was carried out on the 106 operational units (data 2014. Validation of the EP: contributions and proposals of action of the members of SEHAD. National Congress 2016: presentation and approval of EP conclusions and proposals. EP deployment phase: it will be extended until 2020 and will be executed by various teams of referents spread over five lines of work. The final objective set for the year 2020 is: to come up with a more homogenous care model; to promote the training and professional recognition of those who work in the HAD; that each hospital in Spain has a HAH unit; recognition and empowerment by the national health system. HAD2020 has marked an inflection point in the SEHAD. The traced path and the effort of all the HAH professionals will allow reaching the vision which the pioneers of the HAH in Spain pursued.

  12. Model-based sphere localization (MBSL) in x-ray projections

    Science.gov (United States)

    Sawall, Stefan; Maier, Joscha; Leinweber, Carsten; Funck, Carsten; Kuntz, Jan; Kachelrieß, Marc

    2017-08-01

    The detection of spherical markers in x-ray projections is an important task in a variety of applications, e.g. geometric calibration and detector distortion correction. Therein, the projection of the sphere center on the detector is of particular interest as the used spherical beads are no ideal point-like objects. Only few methods have been proposed to estimate this respective position on the detector with sufficient accuracy and surrogate positions, e.g. the center of gravity, are used, impairing the results of subsequent algorithms. We propose to estimate the projection of the sphere center on the detector using a simulation-based method matching an artificial projection to the actual measurement. The proposed algorithm intrinsically corrects for all polychromatic effects included in the measurement and absent in the simulation by a polynomial which is estimated simultaneously. Furthermore, neither the acquisition geometry nor any object properties besides the fact that the object is of spherical shape need to be known to find the center of the bead. It is shown by simulations that the algorithm estimates the center projection with an error of less than 1% of the detector pixel size in case of realistic noise levels and that the method is robust to the sphere material, sphere size, and acquisition parameters. A comparison to three reference methods using simulations and measurements indicates that the proposed method is an order of magnitude more accurate compared to these algorithms. The proposed method is an accurate algorithm to estimate the center of spherical markers in CT projections in the presence of polychromatic effects and noise.

  13. 7 CFR 1777.13 - Project priority.

    Science.gov (United States)

    2010-01-01

    ... joint financing committed to the proposed project is: (i) Twenty percent or more private, local, or.... (See definition in § 1777.4). The proposed project will provide water and/or waste disposal services to... 7 Agriculture 12 2010-01-01 2010-01-01 false Project priority. 1777.13 Section 1777.13 Agriculture...

  14. White Paper on Data Repository Reorganization Proposal for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B [ORNL; Williams, Paul T [ORNL; Bass, Bennett Richard [ORNL

    2012-09-01

    As the xLPR project moves along, it is important to properly manage the knowledge generated by the different groups. We focus specifically on the knowledge and communications written in files, including general documents, source code and executable files. Data generated through the project are different in nature and, for this reason, need to be treated differently. To that end, ORNL put in place a series of tools that facilitate proper storage and management of project data, document and code changes, group collaboration, knowledge transfer, transparency, accountability and auditability. This paper describes the approaches/tools that we recommend for moving the project forward on knowledge management.

  15. Evolution of the GATE project: new results and developments

    Energy Technology Data Exchange (ETDEWEB)

    Santin, G. [ESA-ESTEC, Keplerlaan 1, 2200 AG Noordwijk (Netherlands); Staelens, S. [ELIS Department, Ghent University, B-9000 Ghent (Belgium); Taschereau, R. [CRUMP Institute for Molecular Imaging, University of California Los Angeles, 700 Westwood Plaza A438, Los Angeles, CA 90095-1770 (United States); Descourt, P. [U650 INSERM, LaTIM, Brest (France); Schmidtlein, C.R. [Memorial Sloan-Kettering Cancer Center, New York, New York, US (United States); Simon, L. [Department of Radiation Oncology, Institut Curie, Paris (France); Visvikis, D. [U650 INSERM, LaTIM, Brest (France); Jan, S. [Service Hospitalier Frederic Joliot (SHFJ), CEA-Orsay, Orsay (France); Buvat, I. [U678 INSERM, CHU Pitie-Salpetriere, Paris (France)

    2007-10-15

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry.

  16. Evolution of the GATE project: new results and developments

    International Nuclear Information System (INIS)

    Santin, G.; Staelens, S.; Taschereau, R.; Descourt, P.; Schmidtlein, C.R.; Simon, L.; Visvikis, D.; Jan, S.; Buvat, I.

    2007-01-01

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry

  17. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  18. Understanding and controlling wind-induced vibrations of bridge cables: Results from the Femern Crossing research project

    DEFF Research Database (Denmark)

    Georgakis, Christos T.; Jakobsen, J. B.; Koss, Holger

    of the project has been the establishment of novel vibration mitigation schemes that could be readily, economically, and effectively implemented on a cable-supported bridge that might form part of the fixed link. In support of the proposed research, Femern A/S commissioned a new climatic wind tunnel, designed......Following the successful completion of the Storebælt and Øresund Crossings, the Danish Ministry of Transport appointed Femern A/S to be in charge of preparation, investigations and planning in relation to the establishment of a fixed link across the Fehmarnbelt. To further investigate the causes...... behind the cable vibrations that were observed on the cable-supported bridges forming part of the aforementioned crossings, Femern A/S commissioned a 5-year international collaborative research project, entitled “Understanding and controlling wind-induced vibrations of bridge cables”. The ultimate goal...

  19. Final terms of reference for the Environmental Impact Assessment (EIA) report for the proposed Suncor Energy Inc., Project Millennium, Fort McMurray, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-04

    This document identifies the information that Suncor will need to prepare and submit as an Environmental Impact Assessment (EIA) report as part of its application to the Alberta Energy and Utilities Board for the construction, operation and reclamation of its proposed Millenium extension of the Steepbank Mine. The report must identify development activities, describe environmental effects, mitigation options and residual effects that are relevant to the assessment of the project. The report must also include a description of the processing facilities, mining activities, utilities and transportation. Similarly, the report must provide a full description of the environmental management systems in place, as well as details of the proposed management of air emissions, water, waste, hydrocarbons, and chemicals. The report will be made public to allow for participation from those who may be affected by the project. This includes residents and organizations in the Fort McMurray, Fort McKay, and Fort Chipewyan areas.

  20. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  1. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  2. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  3. The global unified parallel file system (GUPFS) project: FY 2002 activities and results

    Energy Technology Data Exchange (ETDEWEB)

    Butler, Gregory F.; Lee, Rei Chi; Welcome, Michael L.

    2003-04-07

    The Global Unified Parallel File System (GUPFS) project is a multiple-phase, five-year project at the National Energy Research Scientific Computing (NERSC) Center to provide a scalable, high performance, high bandwidth, shared file system for all the NERSC production computing and support systems. The primary purpose of the GUPFS project is to make it easier to conduct advanced scientific research using the NERSC systems. This is to be accomplished through the use of a shared file system providing a unified file namespace, operating on consolidated shared storage that is directly accessed by all the NERSC production computing and support systems. During its first year, FY 2002, the GUPFS project focused on identifying, testing, and evaluating existing and emerging shared/cluster file system, SAN fabric, and storage technologies; identifying NERSC user input/output (I/O) requirements, methods, and mechanisms; and developing appropriate benchmarking methodologies and benchmark codes for a parallel environment. This report presents the activities and progress of the GUPFS project during its first year, the results of the evaluations conducted, and plans for near-term and longer-term investigations.

  4. A recurrent neural network based on projection operator for extended general variational inequalities.

    Science.gov (United States)

    Liu, Qingshan; Cao, Jinde

    2010-06-01

    Based on the projection operator, a recurrent neural network is proposed for solving extended general variational inequalities (EGVIs). Sufficient conditions are provided to ensure the global convergence of the proposed neural network based on Lyapunov methods. Compared with the existing neural networks for variational inequalities, the proposed neural network is a modified version of the general projection neural network existing in the literature and capable of solving the EGVI problems. In addition, simulation results on numerical examples show the effectiveness and performance of the proposed neural network.

  5. FUNMIG Integrated Project results and conclusions from a safety case perspective

    International Nuclear Information System (INIS)

    Schwyn, B.; Wersin, P.; Rüedi, J.; Schneider, J.; Altmann, S.; Missana, T.; Noseck, U.

    2012-01-01

    scales and by developing improved modelling approaches. The disposal concept in salt host rocks differs from those in other host rock types in that the host rock is, at least in part, regarded as near-field from which under normal scenarios no release of radionuclides is possible. Corresponding investigations in FUNMIG concerned therefore not salt host rocks but an example of an overburden under the premise of radionuclide escape from the salt barrier. Selected highlights with regard to FUNMIG’s achievements include: For argillaceous host rocks, the systematic effort of investigating and comparing diffusion and sorption processes at different scales in different clay rocks using a variety of methods has substantially increased the knowledge basis for future safety cases. For crystalline host rocks, valuable data on the generation, transport and filtration of clay colloids from the near-field and their impact on RN transport under realistic conditions have been obtained. The results from studies on organic colloids and on biofilms, including their interaction with radionuclides, have been shown to be of interest for future safety cases of salt-host rocks. Among the main research issues from a PA perspective that need to be addressed in the future, the following are noted: (i) the question of irreversibility of RN sorption to colloids in fractures of crystalline rocks, (ii) a comprehensive model for cation and anion diffusion in clays for different scales and (iii) the applicability of mechanistic retardation models for strongly sorbing radionuclides in intact clay and crystalline host rocks. An important lesson learnt from the interaction between research and PA is that it would be desirable to apply a similar evaluation procedure for proposed research tasks before the start of the research work. In this regard, the procedures developed within FUNMIG are a useful tool for planning future Integrated Projects.

  6. Computational issues in alternating projection algorithms for fixed-order control design

    DEFF Research Database (Denmark)

    Beran, Eric Bengt; Grigoriadis, K.

    1997-01-01

    Alternating projection algorithms have been introduced recently to solve fixed-order controller design problems described by linear matrix inequalities and non-convex coupling rank constraints. In this work, an extensive numerical experimentation using proposed benchmark fixed-order control design...... examples is used to indicate the computational efficiency of the method. These results indicate that the proposed alternating projections are effective in obtaining low-order controllers for small and medium order problems...

  7. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    Science.gov (United States)

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  8. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    Science.gov (United States)

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  9. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  10. Softwareland Chronicles: A Software Development Meta-Process Proposal

    Directory of Open Access Journals (Sweden)

    Bolanos Sandro

    2016-05-01

    Full Text Available This paper presents the software development meta-process (SD-MP as a proposal to set up software projects. Within this proposal we offer conceptual elements that help solve the war of methodologies and processes in favor of an integrating viewpoint, where the main flaws associated with conventional and agile approaches are removed. Our newly developed software platform to support the meta-process is also presented together with three case studies involving projects currently in progress, where the framework proposed in SD-MP has been applied.

  11. H Scan/AHP advanced technology proposal evaluation process

    Energy Technology Data Exchange (ETDEWEB)

    Mack, S. [Energetics, Inc., Columbia, MD (United States); Valladares, M.R.S. de [National Renewable Energy Lab., Washington, DC (United States)

    1996-10-01

    It is anticipated that a family of high value/impact projects will be funded by the Hydrogen Program to field test hydrogen technologies that are at advanced stages of development. These projects will add substantial value to the Program in several ways, by: demonstrating successful integration of multiple advanced technologies, providing critical insight on issues of larger scale equipment design, construction and operations management, yielding cost and performance data for competitive analysis, refining and deploying enhanced safety measures. These projects will be selected through a competitive proposal evaluation process. Because of the significant scope and funding levels of projects at these development phases, Program management has indicated the need for an augmented proposal evaluation strategy to ensure that supported projects are implemented by capable investigative teams and that their successful completion will optimally advance programmatic objectives. These objectives comprise a complex set of both quantitative and qualitative factors, many of which can only be estimated using expert judgment and opinion. To meet the above need, the National Renewable Energy Laboratory (NREL) and Energetics Inc. have jointly developed a proposal evaluation methodology called H Scan/AHP. The H Scan component of the process was developed by NREL. It is a two-part survey instrument that substantially augments the type and scope of information collected in a traditional proposal package. The AHP (Analytic Hierarchy Process) component was developed by Energetics. The AHP is an established decision support methodology that allows the Program decision makers to evaluate proposals relatively based on a unique set of weighted criteria that they have determined.

  12. 23 CFR 635.112 - Advertising for bids and proposals.

    Science.gov (United States)

    2010-04-01

    ... OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.112 Advertising for bids and proposals. (a) No work shall be undertaken on any Federal-aid project, nor shall any project be advertised for bids... 23 Highways 1 2010-04-01 2010-04-01 false Advertising for bids and proposals. 635.112 Section 635...

  13. Dry Rod Consolidation Technology Project results

    International Nuclear Information System (INIS)

    Mullen, C.K.; Feldman, E.M; Vinjamuri, K.; Griebenow, B.L.; Lynch, R.J.; Arave, A.E.; Hill, R.C.

    1988-01-01

    The Dry Rod Consolidation Technology (DRCT) Project conducted at the Idaho National Engineering Laboratory (INEL), in 1987 demonstrated the technical feasibility of a dry horizontal fuel rod consolidation process. Fuel rods from Westinghouse 15 /times/ 15 pressurized water reactor (PWR) spent fuel assemblies were consolidated into canisters to achieve a 2:1 volume reduction ratio. The consolidation equipment was operated at an existing hot cell complex at the INEL. The equipment was specifically designed to interface with the existing facility fuel handling and operational capabilities and was instrumented to provide data collection for process technology research. During the operational phase, data were collected from observation of the consolidation process, fuel assembly handling, and fuel rod behavior and characteristics. Equipment performance was recorded and data measurements were compiled on crud and contamination generated and spread. Fuel assembly skeletons [non-fuel bearing components (NFBC)] were gamma scanned and analyzed for isotopic content and profile. The above data collection was enhanced by extensive photograph and video documentation. The loaded consolidation fuel canisters were utilized for a test of the Transnuclear, Inc. TN-24P dry storage cask with consolidated fuel. The NFBC material was stored for a future volume reduction demonstration project. 14 figs., 4 tabs

  14. Ultrasonic computerized tomography (CT) for temperature measurements with limited projection data based on extrapolated filtered back projection (FBP) method

    International Nuclear Information System (INIS)

    Zhu Ning; Jiang Yong; Kato, Seizo

    2005-01-01

    This study uses ultrasound in combination with tomography to obtain three-dimensional temperature measurements using projection data obtained from limited projection angle. The main feature of the new computerized tomography (CT) reconstruction algorithm is to employ extrapolation scheme to make up for the incomplete projection data, it is based on the conventional filtered back projection (FBP) method while on top of that taking into account the correlation between the projection data and Fourier transform-based extrapolation. Computer simulation is conducted to verify the above algorithm. An experimental 3D temperature distribution measurement is also carried out to validate the proposed algorithm. The simulation and experimental results demonstrate that the extrapolated FBP CT algorithm is highly effective in dealing with projection data from limited projection angle

  15. Evaluation of microfinance projects.

    Science.gov (United States)

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  16. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    BOOM, R.J.

    1999-01-01

    Section I: Background Return on Investment (ROI) Proposal Preparation Guide-- Over $1.9M is available to fund fiscal year (FY) 2000 waste minimization projects on the Hanford Site. This money was allocated by the US. Department of Energy Headquarters (DOE-HQ). The U.S. Department of Energy, Richland Operations (RL) and the U.S. Department of Energy, Office of River Protection (ORP) are currently seeking pollution prevention proposals from across the Hanford Site that provide a high return-on-investment (ROI) by reducing waste and associated management costs. Purpose of ROI Training The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to RL for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding. This guide accompanies the one-hour training workshop on how to prepare and submit an ROI proposal

  17. [Results of the implementation of the Bacteremia Zero project in Catalonia, Spain].

    Science.gov (United States)

    Alvarez-Lerma, Francisco; Oliva, Glòria; Ferrer, Joan M; Riera, Alba; Palomar, Mercedes

    2014-07-01

    The nationwide Bacteremia Zero (BZ) Project consists in the simultaneous implementation of measures to prevent central venous catheter-related bacteremia (CVC-B) in critically ill patients and in the development of an integral safety plan. The objective is to present the results obtained after the implementation of the BZ project in the ICUs of the Autonomous Community of Catalonia, Spain. All patients admitted to ICUs in Catalonia participating in the ENVIN-HELICS registry between January 2009 and June 2010 were included. Information was provided by 36 (92.3%) of the total possible 39 ICUs. A total of 281 episodes of CVC-B were diagnosed (overall rate of 2.53 episodes per 1000 days of CVC). The rates have varied significantly between ICUs that participated in the project for more or less than 12 months (2.17 vs. 4.27 episodes per 1000 days of CVC, respectively; p<.0001). The implementation of the BZ Project in Catalonia has been associated with a decrease greater than 40% in the CVC-B rates in the ICUs of this community, which is much higher than the initial objective of 4 episodes per 1000 days of CVC). Copyright © 2014. Published by Elsevier Espana.

  18. Statistical CT noise reduction with multiscale decomposition and penalized weighted least squares in the projection domain

    International Nuclear Information System (INIS)

    Tang Shaojie; Tang Xiangyang

    2012-01-01

    Purposes: The suppression of noise in x-ray computed tomography (CT) imaging is of clinical relevance for diagnostic image quality and the potential for radiation dose saving. Toward this purpose, statistical noise reduction methods in either the image or projection domain have been proposed, which employ a multiscale decomposition to enhance the performance of noise suppression while maintaining image sharpness. Recognizing the advantages of noise suppression in the projection domain, the authors propose a projection domain multiscale penalized weighted least squares (PWLS) method, in which the angular sampling rate is explicitly taken into consideration to account for the possible variation of interview sampling rate in advanced clinical or preclinical applications. Methods: The projection domain multiscale PWLS method is derived by converting an isotropic diffusion partial differential equation in the image domain into the projection domain, wherein a multiscale decomposition is carried out. With adoption of the Markov random field or soft thresholding objective function, the projection domain multiscale PWLS method deals with noise at each scale. To compensate for the degradation in image sharpness caused by the projection domain multiscale PWLS method, an edge enhancement is carried out following the noise reduction. The performance of the proposed method is experimentally evaluated and verified using the projection data simulated by computer and acquired by a CT scanner. Results: The preliminary results show that the proposed projection domain multiscale PWLS method outperforms the projection domain single-scale PWLS method and the image domain multiscale anisotropic diffusion method in noise reduction. In addition, the proposed method can preserve image sharpness very well while the occurrence of “salt-and-pepper” noise and mosaic artifacts can be avoided. Conclusions: Since the interview sampling rate is taken into account in the projection domain

  19. Generalized algorithm for X-ray projections generation in cone-beam tomography

    International Nuclear Information System (INIS)

    Qin Zhongyuan; Mu Xuanqin; Wang Ping; Cai Yuanlong; Hou Chuanjian

    2002-01-01

    In order to get rid of random factors in the measurement so as to support proceeding 3D reconstruction, a general approach is presented to obtain the X-ray projections in cone-beam tomography. The phantom is firstly discretized into cubic volume through inverse transformation then a generalized projection procedure is proposed to the digitized result without concerning what the phantom exactly is. In the second step, line integrals are calculated to obtain the projection of each X-ray through accumulation of tri-linear interpolation. Considering projection angles, a rotation matrix is proposed to the X-ray source and the detector plane so projections in arbitrary angles can be got. In this approach the algorithm is easy to be extended and irregular objects can also be processed. The algorithm is implemented in Visual C++ and experiments are done using different models. Satisfactory results are obtained. It makes good preparation for the proceeding reconstruction

  20. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  1. Draft environmental impact statement: KENETECH/PacifiCorp Windpower Project, Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-01-01

    This Draft Environmental Impact Statement assesses the environmental consequences of a proposed windpower development project in Carbon County, between Arlington and Hanna, Wyoming. Public scoping commenced in January 1994. All issues raised during scoping and interdisciplinary team preparation of the analysis are addressed. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts resulting from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  2. Construction of indicators for evaluation of the results of projects under energetic and socio-environmental approach; Construcao de indice para a avaliacao de resultados de projetos sob enfoque energetico e socio-ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Berni, Mauro Donizeti; Leite, Alvaro A.F. [Universidade Estadual de Campinas (NIPE/UNICAMP), SP (Brazil). Nucleo Interdisciplinar de Planejamento Energetico], e-mail: mauro_berni@yahoo.com.br; Bacellar, Andre Melo; Soares, Luciana R [Agencia Nacional de Energia Eletrica (ANEEL), Brasilia, DF (Brazil); Pego, Bolivar [Instituto de Pesquisa Economica Aplicada (IPEA), Sao Paulo, SP (Brazil)

    2008-07-01

    The establishment and the effective use of sustainability index incorporating variables such as energy, social and environmental, as subsidy to the socket of decision, it has globally been growing. This tool had increased his use, starting from the Conference of the United Nations on Environment and Development (Rio 92) decisions emphasizing the sustainable development. This work, proposes and it demonstrates the validation of a new methodology for evaluation of the results of projects of Research and Development (R and D), for the energy sector and environmental impacts of the implementation of the referred projects. The methodology contemplates the establishment of the Index IRA and the criteria for evaluation of the results of the projects of R and D, under the energy and social and environmental aspects. (author)

  3. OECD-IAEA Paks Fuel Project. Detailed Description of the Results of Calculations

    International Nuclear Information System (INIS)

    2010-05-01

    On 10 April 2003 severe damage of fuel assemblies took place during an incident at Unit 2 of Paks Nuclear Power Plant in Hungary. The assemblies were being cleaned in a special tank below the water level of the spent fuel storage pool in order to remove crud buildup. That afternoon, the chemical cleaning of assemblies was completed and the fuel rods were being cooled by circulation of storage pool water. The first sign of fuel failure was the detection of some fission gases released from the cleaning tank during that evening. The cleaning tank cover locks were released after midnight and this operation was followed by a sudden increase in activity concentrations. The visual inspection revealed that all 30 fuel assemblies were severely damaged. The first evaluation of the event showed that the severe fuel damage happened due to inadequate coolant circulation within the cleaning tank. The damaged fuel assemblies will be removed from the cleaning tank in 2005 and will be stored in special canisters in the spent fuel storage pool of the Paks NPP. Following several discussions between expert from different countries and international organisations the OECD-IAEA Paks Fuel Project was proposed. The project is envisaged in two phases. - Phase 1 is to cover organization of visual inspection of material, preparation of database, performance of analyses and preparatory work for fuel examination. - Phase 2 is to cover the fuel transport and the hot cell examination

  4. A general exact method for synthesizing parallel-beam projections from cone-beam projections via filtered backprojection

    International Nuclear Information System (INIS)

    Li Liang; Chen Zhiqiang; Xing Yuxiang; Zhang Li; Kang Kejun; Wang Ge

    2006-01-01

    In recent years, image reconstruction methods for cone-beam computed tomography (CT) have been extensively studied. However, few of these studies discussed computing parallel-beam projections from cone-beam projections. In this paper, we focus on the exact synthesis of complete or incomplete parallel-beam projections from cone-beam projections. First, an extended central slice theorem is described to establish a relationship between the Radon space and the Fourier space. Then, data sufficiency conditions are proposed for computing parallel-beam projection data from cone-beam data. Using these results, a general filtered backprojection algorithm is formulated that can exactly synthesize parallel-beam projection data from cone-beam projection data. As an example, we prove that parallel-beam projections can be exactly synthesized in an angular range in the case of circular cone-beam scanning. Interestingly, this angular range is larger than that derived in the Feldkamp reconstruction framework. Numerical experiments are performed in the circular scanning case to verify our method

  5. Preliminary Study of the Effect of the Proposed Long Lake Valley Project Operation on the Transport of Larval Suckers in Upper Klamath Lake, Oregon

    Science.gov (United States)

    Wood, Tamara M.

    2009-01-01

    A hydrodynamic model of Upper Klamath and Agency Lakes, Oregon, was used to explore the effects of the operation of proposed offstream storage at Long Lake Valley on transport of larval suckers through the Upper Klamath and Agency Lakes system during May and June, when larval fish leave spawning sites in the Williamson River and springs along the eastern shoreline and become entrained in lake currents. A range in hydrologic conditions was considered, including historically high and low outflows and inflows, lake elevations, and the operation of pumps between Upper Klamath Lake and storage in Long Lake Valley. Two wind-forcing scenarios were considered: one dominated by moderate prevailing winds and another dominated by a strong reversal of winds from the prevailing direction. On the basis of 24 model simulations that used all combinations of hydrology and wind forcing, as well as With Project and No Action scenarios, it was determined that the biggest effect of project operations on larval transport was the result of alterations in project management of the elevation in Upper Klamath Lake and the outflow at the Link River and A Canal, rather than the result of pumping operations. This was because, during the spring time period of interest, the amount of water pumped between Upper Klamath Lake and Long Lake Valley was generally small. The dominant effect was that an increase in lake elevation would result in more larvae in the Williamson River delta and in Agency Lake, an effect that was enhanced under conditions of wind reversal. A decrease in lake elevation accompanied by an increase in the outflow at the Link River had the opposite effect on larval concentration and residence time.

  6. Melanocortin-1 receptor, skin cancer and phenotypic characteristics (M-SKIP project: study design and methods for pooling results of genetic epidemiological studies

    Directory of Open Access Journals (Sweden)

    Raimondi Sara

    2012-08-01

    Full Text Available Abstract Background For complex diseases like cancer, pooled-analysis of individual data represents a powerful tool to investigate the joint contribution of genetic, phenotypic and environmental factors to the development of a disease. Pooled-analysis of epidemiological studies has many advantages over meta-analysis, and preliminary results may be obtained faster and with lower costs than with prospective consortia. Design and methods Based on our experience with the study design of the Melanocortin-1 receptor (MC1R gene, SKin cancer and Phenotypic characteristics (M-SKIP project, we describe the most important steps in planning and conducting a pooled-analysis of genetic epidemiological studies. We then present the statistical analysis plan that we are going to apply, giving particular attention to methods of analysis recently proposed to account for between-study heterogeneity and to explore the joint contribution of genetic, phenotypic and environmental factors in the development of a disease. Within the M-SKIP project, data on 10,959 skin cancer cases and 14,785 controls from 31 international investigators were checked for quality and recoded for standardization. We first proposed to fit the aggregated data with random-effects logistic regression models. However, for the M-SKIP project, a two-stage analysis will be preferred to overcome the problem regarding the availability of different study covariates. The joint contribution of MC1R variants and phenotypic characteristics to skin cancer development will be studied via logic regression modeling. Discussion Methodological guidelines to correctly design and conduct pooled-analyses are needed to facilitate application of such methods, thus providing a better summary of the actual findings on specific fields.

  7. Melanocortin-1 receptor, skin cancer and phenotypic characteristics (M-SKIP) project: study design and methods for pooling results of genetic epidemiological studies

    Science.gov (United States)

    2012-01-01

    Background For complex diseases like cancer, pooled-analysis of individual data represents a powerful tool to investigate the joint contribution of genetic, phenotypic and environmental factors to the development of a disease. Pooled-analysis of epidemiological studies has many advantages over meta-analysis, and preliminary results may be obtained faster and with lower costs than with prospective consortia. Design and methods Based on our experience with the study design of the Melanocortin-1 receptor (MC1R) gene, SKin cancer and Phenotypic characteristics (M-SKIP) project, we describe the most important steps in planning and conducting a pooled-analysis of genetic epidemiological studies. We then present the statistical analysis plan that we are going to apply, giving particular attention to methods of analysis recently proposed to account for between-study heterogeneity and to explore the joint contribution of genetic, phenotypic and environmental factors in the development of a disease. Within the M-SKIP project, data on 10,959 skin cancer cases and 14,785 controls from 31 international investigators were checked for quality and recoded for standardization. We first proposed to fit the aggregated data with random-effects logistic regression models. However, for the M-SKIP project, a two-stage analysis will be preferred to overcome the problem regarding the availability of different study covariates. The joint contribution of MC1R variants and phenotypic characteristics to skin cancer development will be studied via logic regression modeling. Discussion Methodological guidelines to correctly design and conduct pooled-analyses are needed to facilitate application of such methods, thus providing a better summary of the actual findings on specific fields. PMID:22862891

  8. How to write a research proposal?

    OpenAIRE

    K Sudheesh; Devika Rani Duggappa; S S Nethra

    2016-01-01

    Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or ?blueprint? for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search...

  9. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  10. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  11. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Science.gov (United States)

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  12. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Science.gov (United States)

    2012-07-17

    ...-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a... licenses for the proposed Uniontown Hydroelectric Project and Newburgh Hydroelectric Project. The...

  13. Protecting Place Through Community Alliances: Haida Gwaii Responds to the Proposed Enbridge Northern Gateway Project

    Science.gov (United States)

    Crist, Valine

    This research contributes to the emerging dialogue concerning power relationships and the alliances that are challenging current frameworks in an attempt to create positive change. Worldwide, local people in rural places are threatened by development paradigms and conflicting social, political, economic, and ecological values. Large-scale development, such as the Enbridge Northern Gateway Project (NGP), provide a tangible example of our failing systems and make the interplay of these elements palpable. Increasingly, communities are coalescing to challenge the current models and economically motivated agendas threatening Indigenous sovereignty and local lifeways. Central to these coalitions are Indigenous peoples who are aligning with non-Indigenous neighbours to renegotiate power relationships. This research examines these dynamic alliances and uses Haida Gwaii's resistance to the NGP as an example of the formidable strength of community coalitions mobilized by intersecting values. To contextualize the NGP within the broader discourse, I problematize Canada's environmental assessment process and consider how media portrays the growing resistance to the proposed project. Drawing on information presented through the environmental assessment, I analyze the main messages and shared values of Haida Gwaii citizens opposed to the NGP. This thesis focuses on this unanimous and galvanizing resistance, which is largely motivated by the reliance on local food sources and an embodied connection to Haida Gwaii shared by Island citizens. The continued denial of Aboriginal title and rights was inherent throughout this consideration and is an underlying theme throughout the analyses.

  14. Virtual fringe projection system with nonparallel illumination based on iteration

    International Nuclear Information System (INIS)

    Zhou, Duo; Wang, Zhangying; Gao, Nan; Zhang, Zonghua; Jiang, Xiangqian

    2017-01-01

    Fringe projection profilometry has been widely applied in many fields. To set up an ideal measuring system, a virtual fringe projection technique has been studied to assist in the design of hardware configurations. However, existing virtual fringe projection systems use parallel illumination and have a fixed optical framework. This paper presents a virtual fringe projection system with nonparallel illumination. Using an iterative method to calculate intersection points between rays and reference planes or object surfaces, the proposed system can simulate projected fringe patterns and captured images. A new explicit calibration method has been presented to validate the precision of the system. Simulated results indicate that the proposed iterative method outperforms previous systems. Our virtual system can be applied to error analysis, algorithm optimization, and help operators to find ideal system parameter settings for actual measurements. (paper)

  15. Adaptive pixel-to-pixel projection intensity adjustment for measuring a shiny surface using orthogonal color fringe pattern projection

    Science.gov (United States)

    Chen, Chao; Gao, Nan; Wang, Xiangjun; Zhang, Zonghua

    2018-05-01

    Three-dimensional (3D) shape measurement based on fringe pattern projection techniques has been commonly used in various fields. One of the remaining challenges in fringe pattern projection is that camera sensor saturation may occur if there is a large range of reflectivity variation across the surface that causes measurement errors. To overcome this problem, a novel fringe pattern projection method is proposed to avoid image saturation and maintain high-intensity modulation for measuring shiny surfaces by adaptively adjusting the pixel-to-pixel projection intensity according to the surface reflectivity. First, three sets of orthogonal color fringe patterns and a sequence of uniform gray-level patterns with different gray levels are projected onto a measured surface by a projector. The patterns are deformed with respect to the object surface and captured by a camera from a different viewpoint. Subsequently, the optimal projection intensity at each pixel is determined by fusing different gray levels and transforming the camera pixel coordinate system into the projector pixel coordinate system. Finally, the adapted fringe patterns are created and used for 3D shape measurement. Experimental results on a flat checkerboard and shiny objects demonstrate that the proposed method can measure shiny surfaces with high accuracy.

  16. Summary results of an assessment of research projects in the National Photovoltaics Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Office of Energy Research (OER) undertook an assessment of 115 research projects (listed in Appendix A) sponsored by the National Photovoltaics Program. The Program is located within the Office of Energy Efficiency and Renewable Energy (EE). This report summarizes the results of that review. The Office of Solar Energy Conversion is responsible for the management of the National Photovoltaics Program. This program focuses on assisting US industry in development of fundamental technology to bring advanced photovoltaic energy systems to commercial use. The purpose of the assessment was to determine the following: (1) the quality of research of individual projects; (2) the impact of these individual projects on the mission of the program; and (3) the priority of future research opportunities.

  17. Summary record of the experts meeting on the proposed OECD-IRSN STLOC project

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this meeting was to determine the interest in member countries for the types of LOCA tests envisaged in the STLOC programme proposed by IRSN. The IRSN proposal was circulated among this Group in advance of the meeting. After the presentations and discussions, the Group recommendations were as follows: different views were expressed as to the need to perform the LOCA integral tests; there was an understanding that the results of separate effect tests (ANL, JAERI, Halden) would need to be obtained before deciding on the intended LOCA tests proposed in STLOC; IRSN and the OECD-NEA should explore the possibility to run the first ST test with air ingress (STLOC1), for which partial funding already exists (this test is foreseen for 2008); the need of LOCA tests as envisaged in STLOC should be re-assessed in about three years time (2006); analytical and experimental progress on LOCA tests should be monitored until then, through for instance the SEGFSM. An executive summary of the IRSN Source term LOCA program LOCA part is given in an appendix

  18. Interdependency in Multimodel Climate Projections: Component Replication and Result Similarity

    Science.gov (United States)

    Boé, Julien

    2018-03-01

    Multimodel ensembles are the main way to deal with model uncertainties in climate projections. However, the interdependencies between models that often share entire components make it difficult to combine their results in a satisfactory way. In this study, how the replication of components (atmosphere, ocean, land, and sea ice) between climate models impacts the proximity of their results is quantified precisely, in terms of climatological means and future changes. A clear relationship exists between the number of components shared by climate models and the proximity of their results. Even the impact of a single shared component is generally visible. These conclusions are true at both the global and regional scales. Given available data, it cannot be robustly concluded that some components are more important than others. Those results provide ways to estimate model interdependencies a priori rather than a posteriori based on their results, in order to define independence weights.

  19. An improved affine projection algorithm for active noise cancellation

    Science.gov (United States)

    Zhang, Congyan; Wang, Mingjiang; Han, Yufei; Sun, Yunzhuo

    2017-08-01

    Affine projection algorithm is a signal reuse algorithm, and it has a good convergence rate compared to other traditional adaptive filtering algorithm. There are two factors that affect the performance of the algorithm, which are step factor and the projection length. In the paper, we propose a new variable step size affine projection algorithm (VSS-APA). It dynamically changes the step size according to certain rules, so that it can get smaller steady-state error and faster convergence speed. Simulation results can prove that its performance is superior to the traditional affine projection algorithm and in the active noise control (ANC) applications, the new algorithm can get very good results.

  20. A low-cost and portable realization on fringe projection three-dimensional measurement

    Science.gov (United States)

    Xiao, Suzhi; Tao, Wei; Zhao, Hui

    2015-12-01

    Fringe projection three-dimensional measurement is widely applied in a wide range of industrial application. The traditional fringe projection system has the disadvantages of high expense, big size, and complicated calibration requirements. In this paper we introduce a low-cost and portable realization on three-dimensional measurement with Pico projector. It has the advantages of low cost, compact physical size, and flexible configuration. For the proposed fringe projection system, there is no restriction to camera and projector's relative alignment on parallelism and perpendicularity for installation. Moreover, plane-based calibration method is adopted in this paper that avoids critical requirements on calibration system such as additional gauge block or precise linear z stage. What is more, error sources existing in the proposed system are introduced in this paper. The experimental results demonstrate the feasibility of the proposed low cost and portable fringe projection system.

  1. Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

    International Nuclear Information System (INIS)

    Jiang, Hanchen; Qiang, Maoshan; Lin, Peng

    2016-01-01

    Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework.

  2. Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, Hanchen, E-mail: jhc13@mails.tsinghua.edu.cn; Qiang, Maoshan, E-mail: qiangms@tsinghua.edu.cn; Lin, Peng, E-mail: celinpe@mail.tsinghua.edu.cn

    2016-11-15

    Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework.

  3. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  4. Which factors predict proposal and uptake of psychological counselling after BRCA1/2 test result disclosure?

    Science.gov (United States)

    Maheu, Christine; Bouhnik, Anne-Deborah; Nogues, Catherine; Mouret-Fourme, Emmanuelle; Stoppa-Lyonnet, Dominique; Lasset, Christine; Berthet, Pascaline; Fricker, Jean-Pierre; Caron, Olivier; Luporsi, Elizabeth; Gladieff, Laurence; Julian-Reynier, Claire

    2014-04-01

    The aim of this study is to prospectively determine the factors contributing to whether unaffected women from BRCA1/2 families reported that clinicians proposed psychological consultations and that they had attended these consultations during the genetic testing process. A prospective study was performed on a national cohort, using self-administered questionnaires to determine the rates of proposal and use of psychological services at the time of BRCA1/2 test result disclosure (N = 533) and during the first year after disclosure (N = 478) among unaffected French women from BRCA1/2 families who had undergone genetic testing for BRCA1/2. Multivariate adjustment was carried out using logistic regression models fitted using generalized estimation equations, with the genetic testing centre as the clustering variable. At the time of BRCA1/2 test result disclosure, a psychological consultation was proposed by cancer geneticists to 72% and 32% of the carriers (N = 232) and noncarriers (N = 301), respectively (p disclosure, 21% of the carriers had consulted a psychologist, versus 9% of the noncarriers (p distress they experienced about their genetic test results (proposal AOR: 1.02; 95% CI 1.01-1.03; uptake AOR: 1.04; 95% CI 1.02-1.06) CONCLUSIONS: Determinants of the proposal/uptake of psychological consultations in the BRCA1/2 testing process highlight the need for inventive strategies to reach the different types of women's profiles. Copyright © 2013 John Wiley & Sons, Ltd.

  5. A proposal to improve ecological compensation practice in road and railway projects in Spain

    Energy Technology Data Exchange (ETDEWEB)

    Villarroya, Ana, E-mail: avillarroya@alumni.unav.es; Puig, Jordi, E-mail: jpbaguer@unav.es

    2013-09-15

    To reduce ecological impacts caused by development projects, avoidance, minimization and compensation techniques have to be taken together into consideration along Environmental Impact Assessment (EIA) procedures. This paper explores the particular role that ecological compensation has had in recent road and railway EIA procedures in Spain, as seen through the review of a set of recent EIA Records of Decision (RODs) that confirms precedent findings. Noticing that residual impacts are not paid much attention, and that there is no evidence of a solid public participation in ecological impact evaluation, it proposes to increase the awareness on residual impacts, as a way to make easier public access to the allegedly most sensitive moment of EIA implementation: (residual) impact evaluation. -- Highlights: ► Ecological compensation practice in Spain is much lower than avoidance or mitigation. ► Residual impacts are overlooked in EIA processes and public participation is low. ► An increased awareness of residual impacts may also promote public participation. ► Current context needs these small steps to move towards better compensation practice.

  6. THE MODEL OF FORMATION A PORTFOLIO OF THE INTERNATIONAL ACTIVITIES PROJECTS OF HEI

    Directory of Open Access Journals (Sweden)

    Сергей Васильевич РУДЕНКО

    2016-02-01

    Full Text Available The paper discusses an approach to assessing the project's value of the university international activities, based on the method of expert assessments and fuzzy-multiple method. Evaluating the effectiveness of the university-based project approach is a key factor in its competitiveness. The necessity substantiated of projects valuation of the university international activities. The concept is based on the matrices evaluation value product, process, international activities and development. For integral evaluation value of the university international activities project, we propose viewed from the standpoint of efficiency of all its results. These results can be roughly characterized by the following benchmarks: educational, scientific, technical, political, economic and social. In turn, key benchmarks characterized by its parameters, which estimate conducted by experts. Rating value of the university international activities project is to define the integral indicator of the value of the project. The proposed approach to determining the value of the international activities university projects, based on expert assessments and methods of fuzzy set theory will evaluate the effectiveness of these projects and implement the optimal choice.

  7. WindFloat Pacific Project, Final Scientific and Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Banister, Kevin [Principle Power, Inc., Emeryville, CA (United States)

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at the project site and, equally, to other deep water, high wind resource areas around the country.

  8. 24 CFR 1003.303 - Project rating.

    Science.gov (United States)

    2010-04-01

    ... address the quality and cost effectiveness of the proposed project, the commitment to sustain the proposed... meets the threshold requirements shall be competitively rated within each Area ONAP's jurisdiction under... project costs. (e) Comprehensiveness and coordination. This factor will address the extent to which the...

  9. Topology optimization of Halbach magnet arrays using isoparametric projection

    International Nuclear Information System (INIS)

    Lee, Jaewook; Nomura, Tsuyoshi; Dede, Ercan M.

    2017-01-01

    Highlights: • Design method of Halbach magnet array is proposed using topology optimization. • Magnet strength and direction are simultaneously optimized by isoparametric projection. • For manufacturing feasibility of magnet, penalization and extrusion schemes are proposed. • Design results of circular shaped Halbach arrays are provided. • Halbach arrays in linear actuator are optimized to maximize magnetic force. - Abstract: Topology optimization using isoparametric projection for the design of permanent magnet patterns in Halbach arrays is proposed. Based on isoparametric shape functions used in the finite element analysis, the permanent magnet strength and magnetization directions in a Halbach array are simultaneously optimized for a given design goal. To achieve fabrication feasibility of a designed Halbach magnet array, two design schemes are combined with the isoparametric projection method. First, a penalization scheme is proposed for designing the permanent magnets to have discrete magnetization direction angles. Second, an extrusion scheme is proposed for the shape regularization of the permanent magnet segments. As a result, the method systematically finds the optimal permanent magnet patterns of a Halbach array considering manufacturing feasibility. In two numerical examples, a circular shaped permanent magnet Halbach array is designed to minimize the magnitude of the magnetic flux density and to maximize the upward direction magnetic flux density inside the magnet array. Logical extension of the method to the design of permanent magnet arrays in linear actuators is provided, where the design goal is to maximize the actuator magnetic force.

  10. Topology optimization of Halbach magnet arrays using isoparametric projection

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jaewook, E-mail: jaewooklee@gist.ac.kr [School of Mechanical Engineering, Gwangju Institute of Science and Technology (GIST), Gwangju, 61005 (Korea, Republic of); Nomura, Tsuyoshi [Toyota Central R& D Labs., Inc., 41-1 Yokomichi, Aichi 480-1192 (Japan); Toyota Research Institute of North America, 1555 Woodridge Avenue, Ann Arbor, MI 48105 (United States); Dede, Ercan M. [Toyota Research Institute of North America, 1555 Woodridge Avenue, Ann Arbor, MI 48105 (United States)

    2017-06-15

    Highlights: • Design method of Halbach magnet array is proposed using topology optimization. • Magnet strength and direction are simultaneously optimized by isoparametric projection. • For manufacturing feasibility of magnet, penalization and extrusion schemes are proposed. • Design results of circular shaped Halbach arrays are provided. • Halbach arrays in linear actuator are optimized to maximize magnetic force. - Abstract: Topology optimization using isoparametric projection for the design of permanent magnet patterns in Halbach arrays is proposed. Based on isoparametric shape functions used in the finite element analysis, the permanent magnet strength and magnetization directions in a Halbach array are simultaneously optimized for a given design goal. To achieve fabrication feasibility of a designed Halbach magnet array, two design schemes are combined with the isoparametric projection method. First, a penalization scheme is proposed for designing the permanent magnets to have discrete magnetization direction angles. Second, an extrusion scheme is proposed for the shape regularization of the permanent magnet segments. As a result, the method systematically finds the optimal permanent magnet patterns of a Halbach array considering manufacturing feasibility. In two numerical examples, a circular shaped permanent magnet Halbach array is designed to minimize the magnitude of the magnetic flux density and to maximize the upward direction magnetic flux density inside the magnet array. Logical extension of the method to the design of permanent magnet arrays in linear actuators is provided, where the design goal is to maximize the actuator magnetic force.

  11. Control panel and indicators for production control in building projects

    Directory of Open Access Journals (Sweden)

    Orihuela Pablo

    2018-02-01

    Full Text Available In general, every project should have indicators that monitor compliance with established goals. In con­struction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper sub­mitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230, presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.

  12. Proposing a Conceptual Framework to Utilize Storytelling Mechanism into Project Management Life Cycle

    Directory of Open Access Journals (Sweden)

    mahdi shami zanjani

    2013-10-01

    Full Text Available It is rather difficult to exploit knowledge in project organizations due to their unique characteristics and temporal behavior of activities. Therefore, development of knowledge management capability among projects is accounted for an important source to gain competitive advantage. This paper tries to provide a conceptual framework in order to introduce applications of storytelling as an effective and inexpensive mechanism for projects knowledge management. At first, a conceptual framework was designed including 58 story applications in activities of project life cycle by studying and analyzing the related literature. Then, validation of this conceptual framework was investigated and verified by relevant experts. Finally, application of storytelling was assessed within the projects of Sanam industrial and commercial company, using the framework designed. Analysis of data demonstrates that out of 58 applications introduced, this company benefit from just 28 applications. Research method in this section was survey. According to the available information, this paper is one of the first researches which have adopted to introduce applications of storytelling in the life cycle of project management by providing a conceptual framework.

  13. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-30

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project is expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality

  14. Cultural Resources Survey and Archeological Inventory of the Proposed Carrollton Revetment Project, Orleans Parish, Louisiana, Phase 1. Volume 1 of 2

    Science.gov (United States)

    2004-11-01

    The proposed project area has a humid sub- kin ash (Fraxinus profunda ), green ash (Frax- tropical climate with prevailing southerly winds. inus...leans on June 27, 1967, is 39’ (1020 F) (Magill Salix nigra Black willow 1990:6; Trahan 1989; Peters and Beall 2002). Fraxinus profunda Pumpkin ash...In addition, the Internet radio show "New bait blue glass jar embossed "BROM... /EM...," Orleans Nostalgia" references radio advertise- refers to a

  15. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  16. Business Value Is not only Dollars : Results from Case Study Research on Agile Software Projects

    NARCIS (Netherlands)

    Racheva, Z.; Daneva, Maia; Sikkel, Nicolaas; Buglione, Luigi; Ali Babar, M.; Vierimaa, Matias; Oivo, Markku

    Business value is a key concept in agile software development. This paper presents results of a case study on how business value and its creation is perceived in the context of agile projects. Our overall conclusion is that the project participants almost never use an explicit and structured

  17. Students Opinions and Attitudes toward LGBT Persons and Rights: Results of a Transnational European Project

    Science.gov (United States)

    Passani, Antonella; Debicki, Marie

    2016-01-01

    This article presents the research results of the European co-funded project NISO: Fighting Homophobia Through Active Citizenship and Media Education. The project combined research and non-formal education activities in four European countries: Belgium, Estonia, Italy and the Netherlands. The research intended to identify and analyze high school…

  18. Future perspectives - proposal for Oxford Physiome Project.

    Science.gov (United States)

    Oku, Yoshitaka

    2010-01-01

    The Physiome Project is an effort to understand living creatures using "analysis by synthesis" strategy, i.e., by reproducing their behaviors. In order to achieve its goal, sharing developed models between different computer languages and application programs to incorporate into integrated models is critical. To date, several XML-based markup languages has been developed for this purpose. However, source codes written with XML-based languages are very difficult to read and edit using text editors. An alternative way is to use an object-oriented meta-language, which can be translated to different computer languages and transplanted to different application programs. Object-oriented languages are suitable for describing structural organization by hierarchical classes and taking advantage of statistical properties to reduce the number of parameter while keeping the complexity of behaviors. Using object-oriented languages to describe each element and posting it to a public domain should be the next step to build up integrated models of the respiratory control system.

  19. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  20. SKI Project-90. Geosphere calculations using CRYSTAL: Stand-alone and CALIBRE-CRYSTAL-biosphere integrated results

    International Nuclear Information System (INIS)

    Worgan, K.; Shaw, W.

    1992-02-01

    In Project-90, the far-field transport of nuclides is assumed to take place in a 200 m long section of rock mass, which starts at the outer boundary of the near-field and ends in a fracture zone. The nuclides are eventually discharged to the biosphere. This document provides an overview of the results obtained with the far-field model CRYSTAL developed by Intera Environmental Division for the Swedish Nuclear Power Inspectorate (SKI). It reports on the results of a series of calculation that have been performed within the SKIs Project-90, and provides some indication of the key parameters for the far field. A more thorough discussion of the implications for performance assessment is given in the Project-90 reports. (au)

  1. 78 FR 44135 - Proposed Collection; 60-Day Comment Request: Application for the Postdoctoral Research Associate...

    Science.gov (United States)

    2013-07-23

    ... comments in writing or request more information on the proposed project, contact Ms. Tammy Dean-Maxwell... public comment on proposed data collection projects, the National Institute of General Medical Sciences (NIGMS), the National Institutes of Health (NIH) will publish periodic summaries of proposed projects to...

  2. Resource Constrained Project Scheduling Subject to Due Dates: Preemption Permitted with Penalty

    Directory of Open Access Journals (Sweden)

    Behrouz Afshar-Nadjafi

    2014-01-01

    Full Text Available Extensive research works have been carried out in resource constrained project scheduling problem. However, scarce researches have studied the problems in which a setup cost must be incurred if activities are preempted. In this research, we investigate the resource constrained project scheduling problem to minimize the total project cost, considering earliness-tardiness and preemption penalties. A mixed integer programming formulation is proposed for the problem. The resulting problem is NP-hard. So, we try to obtain a satisfying solution using simulated annealing (SA algorithm. The efficiency of the proposed algorithm is tested based on 150 randomly produced examples. Statistical comparison in terms of the computational times and objective function indicates that the proposed algorithm is efficient and effective.

  3. 77 FR 75915 - Review and Approval of Projects

    Science.gov (United States)

    2012-12-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... set forth in this proposed rulemaking is to make further modifications to the Commission's project...

  4. User Participation in Coproduction of Health Innovation: Proposal for a Synergy Project.

    Science.gov (United States)

    Nygren, Jens; Zukauskaite, Elena; Westberg, Niklas

    2018-05-09

    This project concerns advancing knowledge, methods, and logic for user participation in coproduction of health innovations. Such advancement is vital for several reasons. From a user perspective, participation in coproduction provides an opportunity to gain real influence over goal definition, design, and implementation of health innovations, ensuring that the solution developed solves real problems in right ways. From a societal perspective, it's a mean to improve the efficiency of health care and the implementation of the Patient Act. As for industry, frameworks and knowledge of coproduction offer tools to operate in a complex sector, with great potential for innovation of services and products. The fundamental objective of this project is to advance knowledge and methods of how user participation in the coproduction of health innovations can be applied in order to benefit users, industry, and public sector. This project is a synergy project, which means that the objective will be accomplished through collaboration and meta-analysis between three subprojects that address different user groups, apply different strategies to promote human health, and relate to different parts of the health sector. Furthermore, subprojects focus on distinctive stages in the spectrum of innovation, with the objective to generate knowledge of the innovation process as a whole. The project is organized around three work packages related to three challenges-coproduction, positioning, and realization. Each subproject is designed such that it has its own field of study with clearly identified objectives but also targets work packages to contribute to the project as a whole. The work on the work packages will use case methodology for data collection and analysis based on the subprojects as data sources. More concretely, logic of multiple case studies will be applied with each subproject representing a separate case which is similar to each other in its attention to user participation in

  5. How to write a research proposal?

    Science.gov (United States)

    Sudheesh, K; Duggappa, Devika Rani; Nethra, S S

    2016-09-01

    Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or 'blueprint' for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search was conducted with keywords such as research proposal, writing proposal and qualitative using search engines, namely, PubMed and Google Scholar, and an attempt has been made to provide broad guidelines for writing a scientifically appropriate research proposal.

  6. 77 FR 5023 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Science.gov (United States)

    2012-02-01

    ... organizations to develop a ``culture of safety'' such that their workforce and processes focus on improving the... proposed information collection project: ``Medical Office Survey on Patient Safety Culture Comparative... . SUPPLEMENTARY INFORMATION: Proposed Project Medical Office Survey on Patient Safety Culture Comparative Database...

  7. The MACHO Project: Preliminary Results from 4 years of SMC observations.

    Science.gov (United States)

    Vandehei, T.; Griest, K.; Lehner, M.; Alcock, C.; Alves, D.; Cook, K.; Marshall, S.; Minniti, D.; Allsman, R.; Axelrod, T.; Freeman, K.; Peterson, B.; Rodgers, A.; Pratt, M.; Becker, A.; Stubbs, C.; Tomaney, A.; Bennett, D.; Quinn, P.; Sutherland, W.; Welch, D.

    1997-12-01

    The MACHO project is a search for dark matter in the form of massive compact halo objects(MACHOs). The project has photometrically monitored tens of millions of stars in the Large Magellanic Cloud (LMC), Small Magellanic Cloud (SMC), and Galactic bulge in search of rare gravitational microlensing events caused by these otherwise invisible objects. Microlensing toward the LMC has allowed powerful statements to be made about the dark population in the halo of our Galaxy, indicating that the MACHO halo fraction could be as high as f=0.5 with a most probable MACHO mass being ~ 0.5Msun. However, to date the LMC has been the only line of sight out of our Galaxy's halo. Clearly, another line of sight would provide a consistency check on these results, as well as another contraint on models of the halo, in particular on halo flattening. The SMC affords us this second line of sight. Here we give a status report on our upcoming 4 year results toward the SMC. We present the results of a preliminary analysis on over 2.2 million stars from 3 square degrees and discuss the implications for the dark matter in the halo of our Galaxy. A detailed analysis of the microlensing candidates toward the SMC, with blending and parallax fits, will be shown. This work is dedicated to the memory of Alex Rodgers.

  8. Ambient Assisted Living and ageing: preliminary results of RITA project.

    Science.gov (United States)

    Aquilano, Michela; Cavallo, Filippo; Bonaccorsi, Manuele; Esposito, Raffaele; Rovini, Erika; Filippi, Massimo; Esposito, Dario; Dario, Paolo; Carrozza, Maria Chiara

    2012-01-01

    The ageing of population is a social phenomenon that most of worldwide countries are facing. They are, and will be even more in the future, indeed trying to find solutions for improving quality of life of their elderly citizens. The project RITA wants to demonstrate that an update of the current socio-medical services with an Ambient Assisted Living (AAL) approach could improve the service efficiency and the quality of life of both elderly and caregiver. This paper presents the preliminary results obtained in RITA.

  9. Optimal fringe angle selection for digital fringe projection technique.

    Science.gov (United States)

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  10. 75 FR 30905 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-06-02

    ... Project Number: LR-209-76 (T.D. 7941). Abstract: Internal Revenue Code section 6324A permits the executor... of a bond or personal liability if an election under section 6166 was made and the executor files an...

  11. Preliminary results of the PREFER FP7 Project

    Science.gov (United States)

    Fusilli, Lorenzo; Laneve, Giovanni; De Bonis, Roberto; Sebastian, Ana; Ferrucci, Fabrizio; Oliveira, Sandra

    2014-05-01

    The need to improve the information and intelligence support for forest fire prevention is widely recognized. Fire prevention is still the most cost-effective strategy when compared to firefighting and extinguishing that are costly, local, and triggered only in response to already ongoing crises. PREFER project, funded under the EU FP7 (G.A. 312931), intends to contribute at responding to such a pragmatic need of southern Europe's forests by: providing timely information products based on the exploitation of all available spacecraft sensors, offering a portfolio of products focused on pre- and post-crisis forest fire emergency, suitable for the users in the different countries of the European Mediterranean area. The PREFER Service portfolio consists of two main services: 1. Information Support to Fire Preparedness/Prevention Phase" (ISP) Service 2. Information Support to Fire Recovery/Reconstruction Phase" (ISR) Service This service is already at an advanced stage having completed the first year of activity. During this time several products have been consolidated: seasonal fuel maps; daily and seasonal fire hazard maps; seasonal risk maps; prescribed fire maps. This paper aims at presenting the preliminary results of the research activity carried out in the framework of the PREFER project, focusing, in particular, on these recalled above. As for Fire Risk and Hazard assessment, many indexes have been developed in the last years. Hardly any of them uses data derived from satellite images. The FPI index is an exception to this rule which, in addition, makes use of meteorological data. In spite of being a very complete index, the FPI still allows room for improvement which justify the interest of PREFER in it. PREFER's innovative approach to FPI will allow taking into account the effect of solar illumination conditions in determining the humidity present in the dead vegetation, and therefore its proneness to burn. PREFER innovation also focus in allowing the index to

  12. The Role of Research in School Project Work and Teacher Development: Results from Project "Schools Ethics Technology."

    Science.gov (United States)

    Wellensiek, Anneliese; Lembens, Anja; Schallies, Michael

    "Schools Ethics Technology" was a German interdisciplinary research project with the Centre of Ethics in the Sciences at the University of Tubingen. The project highlighted the new topic of biotechnology and genetic engineering, involving the formation of active project groups within schools. This study examined teaching activities…

  13. Final environmental assessment for the Liquid Phase Methanol (LPMEOH trademark) Project

    International Nuclear Information System (INIS)

    1995-06-01

    The proposed project is to demonstrate on a commercial scale the production of methanol from coal-derived synthesis gas using the LPMEOH trademark process. The methanol produced during this demonstration will be used as a chemical feedstock (on-site) and/or as an alternative fuel in stationary and transportation applications (off-site). In addition, the production of dimethyl ether (DME) as a mixed co-product with methanol may be demonstrated for a six month period under the proposed project pending the results of laboratory/pilot-scale research on scale-up. The DME would be used as fuel in on-site boilers. The proposed LPMEOH facility would occupy approximately 0.6 acres of the 3,890-acre Eastman Chemical facility in Kingsport, TN. The effects of the proposed project include changes in air emissions, wastewater discharge, cooling water discharge, liquid waste quantities, transportation activities, socioeconomic effects, and quantity of solids for disposal. No substantive negative impacts or environmental concerns were identified

  14. Proposed Darlington generating station

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed Darlington GS A project, consisting of four 850 MW CANDU-type reactors, is described. Construction and operation will cause environmental changes with regard to air, water, aquatic life, the site area, safety and noise, and the predicted changes are described. (E.C.B.)

  15. ERRAPRI Project: estimation of radiation risk to patients in interventional radiology, initial results and proposed levels of complexity; Proyecto ERRAPRI: estimacion del riesgo radiologico a los pacientes en radiologia intervencionista. Primeros resultados y propuestas de indices de complejidad

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz Cruces, R.; Vano, E.; Hernandez-Armas, J.; Carrera, F.; Diaz, F.; Gallego Beuther, J. F.; Ruiz Munoz-Canela, J. P.; Sanchez Casanueva, R.; Perez Martinez, M.; Fernandez Soto, J. M.; Munoz, V.; Moreno, F.; Moreno, C.; Martin-Palanca, A.

    2011-07-01

    The project ERRAPRI (2009 - 2012) will assess the most relevant aspects of the radiological risk associated with interventional radiology techniques (IR) guided by fluoroscopy in a sample of Spanish hospitals of three autonomous regions. Specific objectives include: assessing procedural protocols, especially the parameters related to radiation dose and diagnostic information obtained to establish balances cost (radiation risk) benefit to the procedures evaluated, and propose an index of complex procedures on several levels, based on the difficulty of making the same, assessing its relationship with the radiation dose values.

  16. Time-Frequency Analysis and Hermite Projection Method Applied to Swallowing Accelerometry Signals

    Directory of Open Access Journals (Sweden)

    Ervin Sejdić

    2010-01-01

    Full Text Available Fast Hermite projections have been often used in image-processing procedures such as image database retrieval, projection filtering, and texture analysis. In this paper, we propose an innovative approach for the analysis of one-dimensional biomedical signals that combines the Hermite projection method with time-frequency analysis. In particular, we propose a two-step approach to characterize vibrations of various origins in swallowing accelerometry signals. First, by using time-frequency analysis we obtain the energy distribution of signal frequency content in time. Second, by using fast Hermite projections we characterize whether the analyzed time-frequency regions are associated with swallowing or other phenomena (vocalization, noise, bursts, etc.. The numerical analysis of the proposed scheme clearly shows that by using a few Hermite functions, vibrations of various origins are distinguishable. These results will be the basis for further analysis of swallowing accelerometry to detect swallowing difficulties.

  17. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  18. 76 FR 21427 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-04-15

    ... other administrative provisions of special application to manufacturers and retailers excise taxes... Manufacturers and Retailers Excise Taxes. OMB Number: 1545-0723. Regulation Project Number: T.D. 8043. Abstract... regulation. Type of Review: Extension of a currently approved collection. Affected Public: Individuals...

  19. INTERDISCIPLINARITY IN PUBLIC SPACE PARTICIPATIVE PROJECTS: METHODS AND RESULTS IN PRACTICE AND TEACHING

    Directory of Open Access Journals (Sweden)

    Pedro Brandão

    2015-06-01

    • In the development of design practice and studio teaching methods We shall see in this paper how interdisciplinary approaches correspond to new and complex urban transformations, focusing on the importance of actors’ interaction processes, combining professional and non-professional knowledge and theory-practice relations. Therefore, we aim at a deepening in public space area of knowledge under the growing complexity of urban life. We see it as a base for further development of collaborative projects and their implications on community empowerment and urban governance at local level. Motivations of this line of work are persistent in several ongoing research projects, aiming to: - Understand public space as a cohesion factor both in urban life and urban form - Manage processes and strategies as elements of urban transformation, - Stimulate the understanding of actors’ roles in urban design practices. - Favoring the questioning of emerging aspects of urban space production… The paper presents and analyses processes, methods and results from civic participation projects developed in the neighbourhood of Barò de Viver (Barcelona and in the District of Marvila (Lisbon. In the first case, a long process initiated in 2004 and partially completed in 2011, neighbours developed the projects "Memory Wall" and Ciutat d'Asuncion Promenade as part of identity construction in public space, in collaboration  with a team of facilitators from CrPolis group. In the second case, different participatory processes dated from 2001 and 2003 have resulted in the implementation of a specific identity urban brand and communication system with an ongoing project of "maps" construction according to the neighbours perception and representation systems. We may conclude that processes of urban governance require more active participation of citizens in projects regarding the improvement of quality of life. At the same time, the implementation of these processes requires a clear

  20. Gaseous time projection chambers for rare event detection: results from the T-REX project. I. Double beta decay

    Energy Technology Data Exchange (ETDEWEB)

    Irastorza, I.G.; Aznar, F.; Castel, J., E-mail: igor.irastorza@cern.ch, E-mail: faznar@unizar.es, E-mail: jfcastel@unizar.es [Grupo de Física Nuclear y Astropartículas, Departamento de Física Teórica, Universidad de Zaragoza, C/ P. Cerbuna 12, Zaragoza, 50009 (Spain); and others

    2016-01-01

    As part of the T-REX project, a number of R and D and prototyping activities have been carried out during the last years to explore the applicability of gaseous Time Projection Chambers (TPCs) with Micromesh Gas Structures (Micromegas) in rare event searches like double beta decay, axion research and low-mass WIMP searches. In both this and its companion paper, we compile the main results of the project and give an outlook of application prospects for this detection technique. While in the companion paper we focus on axions and WIMPs, in this paper we focus on the results regarding the measurement of the double beta decay (DBD) of {sup 136}Xe in a high pressure Xe (HPXe) TPC. Micromegas of the microbulk type have been extensively studied in high pressure Xe and Xe mixtures. Particularly relevant are the results obtained in Xe + trimethylamine (TMA) mixtures, showing very promising results in terms of gain, stability of operation, and energy resolution at high pressures up to 10 bar. The addition of TMA at levels of ∼ 1% reduces electron diffusion by up to a factor of 10 with respect to pure Xe, improving the quality of the topological pattern, with a positive impact on the discrimination capability. Operation with a medium size prototype of 30 cm diameter and 38 cm of drift (holding about 1 kg of Xe at 10 bar in the fiducial volume, enough to contain high energy electron tracks in the detector volume) has allowed to test the detection concept in realistic experimental conditions. Microbulk Micromegas are able to image the DBD ionization signature with high quality while, at the same time, measuring its energy deposition with a resolution of at least a ∼ 3% FWHM @ Q{sub ββ}. This value was experimentally demonstrated for high-energy extended tracks at 10 bar, and is probably improvable down to the ∼ 1% FWHM levels as extrapolated from low energy events. In addition, first results on the topological signature information (one straggling track ending in two

  1. Proposed approach for developing process-based KPIs for project control during the pre-project stage

    NARCIS (Netherlands)

    Haponava, T.; Al-Jibouri, Saad H.S.; Mawdesley, M.; Ahmed, Syed M.; Azhar, Salman; Mohamed, Sherif

    2007-01-01

    In recent years a great deal of attention has been made to measuring different aspects of construction project performance. Some of the tools used for this purpose are the Key Performance Indicators (KPIs). The main shortcoming of these however is that most of them are end product oriented and hence

  2. 76 FR 32969 - National Technical Assistance and Dissemination Center for Children Who Are Deaf-Blind; Proposed...

    Science.gov (United States)

    2011-06-07

    ... result in appropriate assessment, planning, placement, and services for individuals who are deaf-blind... for Children Who Are Deaf-Blind; Proposed Extension of Project Period and Waiver AGENCY: Office of... Assistance and Dissemination Center for Children Who Are Deaf-Blind. SUMMARY: The Secretary proposes to waive...

  3. 14 CFR 152.109 - Project eligibility: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is included...

  4. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  5. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  6. Adaptive projection intensity adjustment for avoiding saturation in three-dimensional shape measurement

    Science.gov (United States)

    Chen, Chao; Gao, Nan; Wang, Xiangjun; Zhang, Zonghua

    2018-03-01

    Phase-based fringe projection methods have been commonly used for three-dimensional (3D) measurements. However, image saturation results in incorrect intensities in captured fringe pattern images, leading to phase and measurement errors. Existing solutions are complex. This paper proposes an adaptive projection intensity adjustment method to avoid image saturation and maintain good fringe modulation in measuring objects with a high range of surface reflectivities. The adapted fringe patterns are created using only one prior step of fringe-pattern projection and image capture. First, a set of phase-shifted fringe patterns with maximum projection intensity value of 255 and a uniform gray level pattern are projected onto the surface of an object. The patterns are reflected from and deformed by the object surface and captured by a digital camera. The best projection intensities corresponding to each saturated-pixel clusters are determined by fitting a polynomial function to transform captured intensities to projected intensities. Subsequently, the adapted fringe patterns are constructed using the best projection intensities at projector pixel coordinate. Finally, the adapted fringe patterns are projected for phase recovery and 3D shape calculation. The experimental results demonstrate that the proposed method achieves high measurement accuracy even for objects with a high range of surface reflectivities.

  7. Proposal to amend a partner project agreement with ISTC for the CMS collaboration

    CERN Document Server

    2000-01-01

    This document concerns an amendment to a partner project agreement with the ISTC, namely the Partner Project Agreement 1718p for "Technology Reliability Demonstration and Precise CMS Electromagnetic Calorimetry Performance at LHC on a Base of Specified Tungstate (PbWO4) Scintillation Crystals". This Partner Project was approved by Council on 17 December 1999 (cf. CERN/2312). For reasons set out in this document the Finance Committee is invited to authorise CERN to negotiate an amendment to the Partner Project Agreement 1718p. The purpose of the amendment is to increase the production rate of crystals through the acquisition, installation and commissioning of 33 additional crystal growth ovens for a total amount of 1 500 000 US dollars.

  8. Proposal for the extension of a partner project agreement with ISTC ? ATLAS collaboration

    CERN Document Server

    2000-01-01

    This document concerns the extension of the scope of work covered by a partner project agreement with the ISTC, namely Partner Project Agreement 1800p for Manufacturing, Assembly and Testing of the End-cap Transition Radiation Tracker (TRT) for the ATLAS Experiment at the CERN LHC. This Partner Project Agreement was approved by Council on 23 June 2000 (c.f. draft minutes of the meeting CERN/2340/Draft). For reasons set out in this document the Finance Committee is invited to approve the extension of the scope of work covered by Partner Project Agreement 1800p to include the Manufacturing, Assembly and Testing of type C End-cap support rings for a total amount of 503 720 Swiss francs.

  9. 77 FR 3840 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-01-25

    ... consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue Service, room 6129...-1353. Regulation Project Number: FI-189-84. Abstract: These regulations provide definitions, reporting requirements, elections, and general rules relating to the tax treatment of debt instruments with original...

  10. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  11. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  12. FY 2000 report on the results of the project for the promotion of industrial technology development for the global environment. Project on the investigational research of high technology; 2000 nendo NEDO seika hokokusho. Chikyu kankyo sangyo gijutsu kaihatsu suishin jigyo - Sentan gijutsu chosa kenkyu jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    High-tech study was conducted for fields of CO2 fixation/effective utilization, technical development of low environmental load substances and technical development of environmentally friendly type production process, and the FY 2000 results were summarized. Out of the proposals for research projects collected in FY 1999, 25 projects that were recognized to be excellent were consigned to contract research. Research Institute of Innovative Technology for the Earth also selected 4 projects for research. Through research activities, 179 projects were made public, and 2 patents were applied for. The number of research themes was 29 including the following themes: development of food resource resistant to the future global environment, study on new circulation type polymer chemical recycling by bio-process, development of dioxin decomposition technology using artificial enzyme and absorption resin, design of rare metal free cathode substance for large lithium ion secondary battery, and reforming of carbon circulation system in the Australian desert by natural humus supply. (NEDO)

  13. Methodology for economic evaluation of software development projects

    International Nuclear Information System (INIS)

    Witte, D.M.

    1990-01-01

    Many oil and gas exploration and production companies develop computer software in-house or with contract programmers to support their exploration activities. Software development projects compete for funding with exploration and development projects, though most companies lack valid comparison measures for the two types of projects. This paper presents a methodology of pro form a cash flow analysis for software development proposals intended for internal use. This methodology, based on estimates of development and support costs, exploration benefits, and probability of successful development and implementation, can be used to compare proposed software development projects directly with competing exploration proposals

  14. Evaluation of water quality conditions near proposed fish production sites associated with the Yakima Fisheries Project. Final report

    International Nuclear Information System (INIS)

    Dauble, D.d.; Mueller, R.P.; Martinson, G.A.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP

  15. R&D Proposal RD51 Extension Beyond 2018

    CERN Document Server

    Dalla Torre, S; Ropelewski, L; Titov, M

    2018-01-01

    The RD51 Collaboration, in charge of the development and dissemination of MicroPattern Gaseous Detectors (MPGD) since 2008, proposes to extend its ac-tivity, after 2018, for a further five-year term. Since the RD51 initial years, the community of MPGD developers and users has grown considerably. It is reflected by the many MPGD-based applications in high energy and nuclear physics experi-ments as well as in other basic and applied-research fields. They rely on the parallel progress of detector concepts and associated technologies. The cultural, infrastruc-ture and networking support offered by RD51 has been essential in this process. The rich portfolio of MPGD projects, under constant expansion, is accompanied by novel ideas on further developments and applications. The proposed next term of RD51 activities aims at bringing a number of de-tector concepts to maturity, initiating new projects and continuing the support to the community. Among leading proposed projects are ultrafast, high-rate MPGDs; discharg...

  16. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  17. How to write a research proposal?

    Directory of Open Access Journals (Sweden)

    K Sudheesh

    2016-01-01

    Full Text Available Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or ′blueprint′ for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search was conducted with keywords such as research proposal, writing proposal and qualitative using search engines, namely, PubMed and Google Scholar, and an attempt has been made to provide broad guidelines for writing a scientifically appropriate research proposal.

  18. First results of the CLIMOD project - prospects

    International Nuclear Information System (INIS)

    Junod, A.

    1981-01-01

    The area investigated extends from the mouth of the Aar at Waldshut and Basle, and between the Black Forest and the top of the Jura range. In this area there are some nuclear powerstations with cooling towers. The CLIMOD project tries to detect changes of present conditions due to the cooling tower and by other anthropogeneous effects, at least qualitatively. (DG) [de

  19. 78 FR 22036 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-12

    ... fair market value of the underlying property before and after the donation and (2) the conservation... qualified conservation contributions (Sec. 1.170A-14). DATES: Written comments should be received on or... INFORMATION: Title: Qualified Conservation Contributions. OMB Number: 1545-0763. Regulation Project Number: TD...

  20. 78 FR 41192 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-09

    ... definitions; excise tax returns. DATES: Written comments should be received on or before September 9, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal... definitions; excise tax returns. OMB Number: 1545-2193. Regulation Project Number: REG-155087-05. Abstract...

  1. 76 FR 69329 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-08

    ... collection requirements related to Tax Shelter Regulations. DATES: Written comments should be received on or before January 9, 2012 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette B... . SUPPLEMENTARY INFORMATION: Title: Tax Shelter Disclosure Regulations. OMB Number: 1545-1685. Regulation Project...

  2. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  3. Solving Multi-Resource Constrained Project Scheduling Problem using Ant Colony Optimization

    Directory of Open Access Journals (Sweden)

    Hsiang-Hsi Huang

    2015-01-01

    Full Text Available This paper applied Ant Colony Optimization (ACO to develop a resource constraints scheduling model to achieve the resource allocation optimization and the shortest completion time of a project under resource constraints and the activities precedence requirement for projects. Resource leveling is also discussed and has to be achieved under the resource allocation optimization in this research. Testing cases and examples adopted from the international test bank were studied for verifying the effectiveness of the proposed model. The results showed that the solutions of different cases all have a better performance within a reasonable time. These can be obtained through ACO algorithm under the same constrained conditions. A program was written for the proposed model that is able to automatically produce the project resource requirement figure after the project duration is solved.

  4. 46 CFR 393.4 - Marine Highway Projects.

    Science.gov (United States)

    2010-10-01

    ... transportation system research, data, and analysis used to develop or support the business model. (vii) Proposed... Highway Projects. (9) Utilize current or future Federal funding mechanisms, as appropriate, to support the...) Organization. Provide the organizational structure of the proposed project, including business affiliations...

  5. Results of a Musa mapping project

    International Nuclear Information System (INIS)

    Lagoda, P.J.L.; Noyer, J.L.; Baurens, F.C.

    1998-01-01

    A completed map, based on two selfed progenies from two banana cultivars (M53 and SFB5) is presented (roughly 1200 cM). More than three hundred markers are linked in 11 linkage groups representing the genome (2n=22) of Musa acuminata. Roughly one third of the markers are co-dominant restriction fragment polymorphisms (RFLPs; one hundred) or micro satellites (thirty). Two thirds of the markers are dominant amplified fragment length polymorphisms (AFLPs; 10% could be considered to be co-dominant). The mean linkage distance is 3 cM, but marker density still should be increased on a couple of linkage groups. Particularities for a mapping job in banana are discussed. Due to Musa acuminata sub-species specific translocations, up to 36% of all the markers tested show important segregation distortions. The need for a cooperative mapping initiative based on a proposed ''frame-map'' harbouring evenly spaced co-dominant ''anchor'' markers is proposed. CIRAD has published 45 sequence tagged micro satellite sites (STMS) in the EMBL database which are accessible at: ''http://www.ebi.ac.uk/'' using the keywords LAGODA and MICROSATELLITE (EMBL accessions X87258 to X87265, X90740 to X90750 and Z85950 to Z85977). (author)

  6. Modelled and Observed Diurnal SST Signals: "SSTDV:R.EX.-IM.A.M." Project Preliminary Results

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Høyer, Jacob; LeBorgne, Pierre

    2013-01-01

    This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase of the proj......This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase...

  7. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  8. nanoSTAIR: a new strategic proposal to impulse standardization in nanotechnology research

    Science.gov (United States)

    López de Ipiña, J. M.; Salvi, O.; Hazebrouck, B.; Jovanovic, A.; Carre, F.; Saamanen, A.; Brouwer, D.; Schmitt, M.; Martin, S.

    2015-05-01

    Nanotechnology is considered one of the key technologies of the 21st century within Europe and a Key-Enabling Technology (KET) by Horizon 2020. Standardization has been identified in H2020 as one of the innovation-support measures by bridging the gap between research and the market, and helping the fast and easy transfer of research results to the European and international market. The development of new and improved standards requires high quality technical information, creating a fundamental interdependency between the standardization and research communities. In the frame of project nanoSTAIR (GA 319092), the present paper describes the European scenario on research and standardization in nanotechnology and presents a proposal of a European strategy (nanoSTAIR) to impulse direct “pipelines” between research and standardization. In addition, strategic actions focused on integration of standardization in the R&D projects, from the early stages of the design of a future business (Project Proposal), are also described.

  9. nanoSTAIR: a new strategic proposal to impulse standardization in nanotechnology research

    International Nuclear Information System (INIS)

    De Ipiña, J M López; Salvi, O; Hazebrouck, B; Jovanovic, A; Carre, F; Saamanen, A; Brouwer, D; Schmitt, M; Martin, S

    2015-01-01

    Nanotechnology is considered one of the key technologies of the 21 st century within Europe and a Key-Enabling Technology (KET) by Horizon 2020. Standardization has been identified in H2020 as one of the innovation-support measures by bridging the gap between research and the market, and helping the fast and easy transfer of research results to the European and international market. The development of new and improved standards requires high quality technical information, creating a fundamental interdependency between the standardization and research communities. In the frame of project nanoSTAIR (GA 319092), the present paper describes the European scenario on research and standardization in nanotechnology and presents a proposal of a European strategy (nanoSTAIR) to impulse direct “pipelines” between research and standardization. In addition, strategic actions focused on integration of standardization in the R and D projects, from the early stages of the design of a future business (Project Proposal), are also described. (paper)

  10. LOCATION ANALYSIS ON SMART HOUSE USING PROJECTIVE TRANSFORMATION

    Directory of Open Access Journals (Sweden)

    Galih Andi Pradana

    2014-08-01

    Full Text Available In this paper, a method of location analysis for smart house is proposed. The proposed method uses projective transformation to process the input from visual sensor for determining coordinate of resident and also the entire device inside the smart house. With a good calculated coordinate, each device function in the smart house can be optimized for the good of the resident. From the experiment results, the proposed method successfully maps all coordinates of any device in the smart house up to 81% accuracy.

  11. Robust Fringe Projection Profilometry via Sparse Representation.

    Science.gov (United States)

    Budianto; Lun, Daniel P K

    2016-04-01

    In this paper, a robust fringe projection profilometry (FPP) algorithm using the sparse dictionary learning and sparse coding techniques is proposed. When reconstructing the 3D model of objects, traditional FPP systems often fail to perform if the captured fringe images have a complex scene, such as having multiple and occluded objects. It introduces great difficulty to the phase unwrapping process of an FPP system that can result in serious distortion in the final reconstructed 3D model. For the proposed algorithm, it encodes the period order information, which is essential to phase unwrapping, into some texture patterns and embeds them to the projected fringe patterns. When the encoded fringe image is captured, a modified morphological component analysis and a sparse classification procedure are performed to decode and identify the embedded period order information. It is then used to assist the phase unwrapping process to deal with the different artifacts in the fringe images. Experimental results show that the proposed algorithm can significantly improve the robustness of an FPP system. It performs equally well no matter the fringe images have a simple or complex scene, or are affected due to the ambient lighting of the working environment.

  12. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  13. Scientific results of the Viking Project

    International Nuclear Information System (INIS)

    Flinn, E.A.; Reid, G.C.; Csanady, G.

    1977-01-01

    The Viking space project launched two unmanned spacecraft to Mars in 1975 for scientific exploration with special emphasis on the search for life. Each spacecraft consisted of an orbiter and a lander. The landing sites were finally selected after the spacecraft were in orbit. Thirteen investigations were performed: three mapping experiments from the orbiter, one atmospheric investigation during the lander entry phase, eight experiments on the surface of the planet, and one using the spacecraft radio and radar systems. The experiments on the surface dealt principally with biology, chemistry, geology, and meteorology. Seventy-eight scientists participated in the 13 teams performing these experiments. 53 individual articles make up this book

  14. ECLogger: Cross-Project Catch-Block Logging Prediction Using Ensemble of Classifiers

    Directory of Open Access Journals (Sweden)

    Sangeeta Lal

    2017-01-01

    Full Text Available Background: Software developers insert log statements in the source code to record program execution information. However, optimizing the number of log statements in the source code is challenging. Machine learning based within-project logging prediction tools, proposed in previous studies, may not be suitable for new or small software projects. For such software projects, we can use cross-project logging prediction. Aim: The aim of the study presented here is to investigate cross-project logging prediction methods and techniques. Method: The proposed method is ECLogger, which is a novel, ensemble-based, cross-project, catch-block logging prediction model. In the research We use 9 base classifiers were used and combined using ensemble techniques. The performance of ECLogger was evaluated on on three open-source Java projects: Tomcat, CloudStack and Hadoop. Results: ECLogger Bagging, ECLogger AverageVote, and ECLogger MajorityVote show a considerable improvement in the average Logged F-measure (LF on 3, 5, and 4 source -> target project pairs, respectively, compared to the baseline classifiers. ECLogger AverageVote performs best and shows improvements of 3.12% (average LF and 6.08% (average ACC – Accuracy. Conclusion: The classifier based on ensemble techniques, such as bagging, average vote, and majority vote outperforms the baseline classifier. Overall, the ECLogger AverageVote model performs best. The results show that the CloudStack project is more generalizable than the other projects.

  15. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    Valero, O.J.

    1998-01-01

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding

  16. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  17. Results from the European Integrated Project '' New Materials for Extreme Environments (ExtreMat) ''

    International Nuclear Information System (INIS)

    Bolt, H.; Linsmeier, Ch.; Baluc, N.; Garcia-Rosales, G.; Gualco, G. C.; Simancik, F.

    2006-01-01

    The goal of the European Integrated Project '' ExtreMat '' is to provide and to industrialize new materials and their compounds for applications in extreme environments that are beyond reach with incremental materials development only. The R(and)D activities in this project aim to provide a) self-passivating protection materials for sensitive structures operated in physico-chemically aggressive environments at high temperatures; b) new heat sink materials with the capability of very efficient heat removal, often at very high temperature level; c) radiation resistant materials for very high operation temperatures; d) new processing routes for complex heterogeneous compounds that can be operated in extreme environments. Key applications for these new materials are in the sectors of fusion, advanced fission, space, and electronic applications. Further use of these materials is expected in spin-off fields, such as brake applications and energy conversion. The project started in December 2004 for a duration of five years and is supported by the European Community. The 37 project participants are from 13 EU member states and include 6 universities, 7 research institutes, 10 research centres and 14 industrial companies. Research results regarding the development of materials for application in nuclear fusion, especially on protection, heat sink, and radiation resistant materials will be presented. A view to other applications of these materials in the fields of fission, space and electronics will be given in the presentation. ExtreMat Project Partners: see http://www.extremat.org/. (author)

  18. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    2004-01-01

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affect wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  19. Proposed methodology for completion of scenario analysis for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Roberds, W.J.; Plum, R.J.; Visca, P.J.

    1984-11-01

    This report presents the methodology to complete an assessment of postclosure performance, considering all credible scenarios, including the nominal case, for a proposed repository for high-level nuclear waste at the Hanford Site, Washington State. The methodology consists of defensible techniques for identifying and screening scenarios, and for then assessing the risks associated with each. The results of the scenario analysis are used to comprehensively determine system performance and/or risk for evaluation of compliance with postclosure performance criteria (10 CFR 60 and 40 CFR 191). In addition to describing the proposed methodology, this report reviews available methodologies for scenario analysis, discusses pertinent performance assessment and uncertainty concepts, advises how to implement the methodology (including the organizational requirements and a description of tasks) and recommends how to use the methodology in guiding future site characterization, analysis, and engineered subsystem design work. 36 refs., 24 figs., 1 tab

  20. BEPS Hybrid Entities Proposal: A slippery slope, especially for developing countries

    NARCIS (Netherlands)

    Sanghavi, Dhruv

    2017-01-01

    Article 1(2) has been proposed in the final report on G20/OECD's Base Erosion and Profit Shifting (BEPS) Action 2. Two principle purposes of the BEPS project can be identified: First, to combat against aggressive tax planning which results in less than single taxation, and secondly, to allocate

  1. 78 FR 35285 - Agency Information Collection Activities; Proposed Collection; Public Comment Request

    Science.gov (United States)

    2013-06-12

    ... training, administrative and organizational structures, clinical service, challenges, innovations, costs... for public comment on proposed data collection projects (Section 3506(c)(2)(A) of the Paperwork... 20857. FOR FURTHER INFORMATION CONTACT: To request more information on the proposed project or to obtain...

  2. Analyzing how we do Analysis and Consume Data, Results from the SciDAC-Data Project

    Science.gov (United States)

    Ding, P.; Aliaga, L.; Mubarak, M.; Tsaris, A.; Norman, A.; Lyon, A.; Ross, R.

    2017-10-01

    One of the main goals of the Dept. of Energy funded SciDAC-Data project is to analyze the more than 410,000 high energy physics datasets that have been collected, generated and defined over the past two decades by experiments using the Fermilab storage facilities. These datasets have been used as the input to over 5.6 million recorded analysis projects, for which detailed analytics have been gathered. The analytics and meta information for these datasets and analysis projects are being combined with knowledge of their part of the HEP analysis chains for major experiments to understand how modern computing and data delivery is being used. We present the first results of this project, which examine in detail how the CDF, D0, NOvA, MINERvA and MicroBooNE experiments have organized, classified and consumed petascale datasets to produce their physics results. The results include analysis of the correlations in dataset/file overlap, data usage patterns, data popularity, dataset dependency and temporary dataset consumption. The results provide critical insight into how workflows and data delivery schemes can be combined with different caching strategies to more efficiently perform the work required to mine these large HEP data volumes and to understand the physics analysis requirements for the next generation of HEP computing facilities. In particular we present a detailed analysis of the NOvA data organization and consumption model corresponding to their first and second oscillation results (2014-2016) and the first look at the analysis of the Tevatron Run II experiments. We present statistical distributions for the characterization of these data and data driven models describing their consumption.

  3. Fringe order error in multifrequency fringe projection phase unwrapping: reason and correction.

    Science.gov (United States)

    Zhang, Chunwei; Zhao, Hong; Zhang, Lu

    2015-11-10

    A multifrequency fringe projection phase unwrapping algorithm (MFPPUA) is important to fringe projection profilometry, especially when a discontinuous object is measured. However, a fringe order error (FOE) may occur when MFPPUA is adopted. An FOE will result in error to the unwrapped phase. Although this kind of phase error does not spread, it brings error to the eventual 3D measurement results. Therefore, an FOE or its adverse influence should be obviated. In this paper, reasons for the occurrence of an FOE are theoretically analyzed and experimentally explored. Methods to correct the phase error caused by an FOE are proposed. Experimental results demonstrate that the proposed methods are valid in eliminating the adverse influence of an FOE.

  4. 77 FR 31912 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-05-30

    ... determining arbitrage profits. Under FI-7-94, the scope of interest rate hedging transactions covered by the... arbitrage restrictions on tax-exempt bonds. DATES: Written comments should be received on or before July 30...: Arbitrage Restrictions on Tax-Exempt Bonds. OMB Number: 1545-1347. Regulation Project Numbers: FI-36-92; FI...

  5. 75 FR 44851 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-29

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting... Income and Earnings and Profits under the Dollar Approximate Separate Transactions Method of Accounting... Transactions Method of Accounting (DASTM). OMB Number: 1545-1051. Regulation Project Number: INTL-29-91...

  6. 75 FR 33671 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-06-14

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing final regulation, REG-106917-99 (TD 8996), Changes in Accounting Periods... INFORMATION: Title: Changes in Accounting Periods. OMB Number: 1545-1748. Regulation Project Number: REG...

  7. 77 FR 57196 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-09-17

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning limitations on corporate net operating loss carryforwards. DATES: Written comments should be received on or... Corporate Net Operating Loss Carryforwards. OMB Number: 1545-1260. Regulation Project Number: CO-62-89...

  8. 78 FR 8222 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-02-05

    ... Minimum Tax--Tax Benefit Rule. DATES: Written comments should be received on or before April 8, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue... Tax--Tax Benefit Rule. OMB Number: 1545-1093. Regulation Project Number: IA-56-87 and IA- 53-87 (TD...

  9. Research on cross - Project software defect prediction based on transfer learning

    Science.gov (United States)

    Chen, Ya; Ding, Xiaoming

    2018-04-01

    According to the two challenges in the prediction of cross-project software defects, the distribution differences between the source project and the target project dataset and the class imbalance in the dataset, proposing a cross-project software defect prediction method based on transfer learning, named NTrA. Firstly, solving the source project data's class imbalance based on the Augmented Neighborhood Cleaning Algorithm. Secondly, the data gravity method is used to give different weights on the basis of the attribute similarity of source project and target project data. Finally, a defect prediction model is constructed by using Trad boost algorithm. Experiments were conducted using data, come from NASA and SOFTLAB respectively, from a published PROMISE dataset. The results show that the method has achieved good values of recall and F-measure, and achieved good prediction results.

  10. Identification of coordination factors affecting building projects performance

    Directory of Open Access Journals (Sweden)

    Wesam Salah Alaloul

    2016-09-01

    Full Text Available Construction projects performance requires improvement to fulfil the complexity of the stakeholders’ needs and expectations. Coordination process is proposed as an efficient solution for weak performance of construction projects. Therefore, coordination factors are vital in ensuring a successful implementation of all project phases. This study aimed to identify and prioritise coordination factors that influence the performance of building projects in Malaysian context. A vast body of literature on coordination process was reviewed and resulted in 53 coordination factor. Three rounds of Delphi technique were conducted. The most effective coordination factors were ranked based on the Relative Importance Index (RII such as Scheduling (RII = 0.97, Quality assurance plan (RII = 0.93, and all parties’ participation in plans (RII = 0.89. These coordination factors have fulfilled the research gap and provided better management and higher performance for project parties. The results offer insightful perspectives to define the most effective coordination factors, for addressing the dependency between project tasks and the parties to enhance project performance.

  11. A Proposal for Desert House Design in Egypt Using Passive Ground Cooling Techniques

    Directory of Open Access Journals (Sweden)

    Mohamed Medhat Dorra

    2018-06-01

    Full Text Available An area less than 5.5% of Egyptian territory is where most of Egypt‘s population lives in. A narrow strip of land forms the Nile Valley and Delta sector.The National Project for Desert Hinterlands is one of the urban projects targeting rehabilitation of the poor in alternative villages in the near desert to stop urban sprawl over agricultural land and decrease the congestion in the old habitats. Low cost energy efficient houses are the aim of the architect in similar projects taking in consideration the high electricity consumption of Egypt’s residential sector. Based on a literature review, this paper presents a proposal for designing desert dwellings   that accommodates the hot dry climate by incorporating passive elements and using stabilized earth blocks as a local building material. Furthermore, simulation is used to test alternative proposals. The results show that an underground constructed house with a sunken courtyard incorporating an Earth to Air Heat Exchanger System (EAHE can reduce between 42-72% of energy consumption used to achieve thermal comfort compared to contemporary desert housing projects.

  12. 76 FR 55741 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-09-08

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Qualified Separate Lines of Business. DATES: Written comments should be received on or before November 7...: Title: Qualified Separate Lines of Business. OMB Number: 1545-1221. Regulation Project Number: EE-147-87...

  13. 76 FR 34807 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-06-14

    ... 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning electing small business trusts. DATES: Written comments should be received on or before August 15, 2011to...: Electing Small Business Trusts. OMB Number: 1545-1591. Regulation Project Number: REG-251701-96 (TD 8894...

  14. 78 FR 24312 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-24

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning, Changes in Accounting Periods. DATES: Written comments should be received on or before June 24, 2013 to be... in Accounting Periods. OMB Number: 1545-1748. Regulation Project Number: TD 8996. Abstract: Section 1...

  15. 75 FR 53023 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-30

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing final regulation, CO-99-91 (TD 8490), Limitations on Corporate Net...: Limitations on Corporate Net Operating Loss. OMB Number: 1545-1345. Regulation Project Number: CO-99-91...

  16. Main results from NILU`s participation in the TOR project; Hovedresultater fra NILUs deltakelse i TOR-prosjektet

    Energy Technology Data Exchange (ETDEWEB)

    Solberg, S; Stordahl, F

    1996-01-01

    The conference paper presents the main results from the Norwegian participation in the TOR (Tropospheric Ozone Research) project. The project was a part of the EUROTRAC environment programme which terminated in 1995. The aim of the TOR project was to increase the knowledge on physical and chemical processes being important for the consentration of ozone in the troposphere. 2 refs., 3 figs.

  17. Human Activity Recognition in AAL Environments Using Random Projections

    Directory of Open Access Journals (Sweden)

    Robertas Damaševičius

    2016-01-01

    Full Text Available Automatic human activity recognition systems aim to capture the state of the user and its environment by exploiting heterogeneous sensors attached to the subject’s body and permit continuous monitoring of numerous physiological signals reflecting the state of human actions. Successful identification of human activities can be immensely useful in healthcare applications for Ambient Assisted Living (AAL, for automatic and intelligent activity monitoring systems developed for elderly and disabled people. In this paper, we propose the method for activity recognition and subject identification based on random projections from high-dimensional feature space to low-dimensional projection space, where the classes are separated using the Jaccard distance between probability density functions of projected data. Two HAR domain tasks are considered: activity identification and subject identification. The experimental results using the proposed method with Human Activity Dataset (HAD data are presented.

  18. Human Activity Recognition in AAL Environments Using Random Projections.

    Science.gov (United States)

    Damaševičius, Robertas; Vasiljevas, Mindaugas; Šalkevičius, Justas; Woźniak, Marcin

    2016-01-01

    Automatic human activity recognition systems aim to capture the state of the user and its environment by exploiting heterogeneous sensors attached to the subject's body and permit continuous monitoring of numerous physiological signals reflecting the state of human actions. Successful identification of human activities can be immensely useful in healthcare applications for Ambient Assisted Living (AAL), for automatic and intelligent activity monitoring systems developed for elderly and disabled people. In this paper, we propose the method for activity recognition and subject identification based on random projections from high-dimensional feature space to low-dimensional projection space, where the classes are separated using the Jaccard distance between probability density functions of projected data. Two HAR domain tasks are considered: activity identification and subject identification. The experimental results using the proposed method with Human Activity Dataset (HAD) data are presented.

  19. IPMA STANDARD ELEMENTS AND FEEDBACK IN PROJECT MANAGEMENT TEACHING

    Directory of Open Access Journals (Sweden)

    BARTOŠKA, Jan

    2011-09-01

    Full Text Available The paper proposes the concept of project management teaching including the International Project Management Association (IPMA standard. The concept of teaching is theoretical and derives from the notion of competence, which the IPMA standard is based on. The paper presents a brief description of the IPMA standard and endeavours to define the notion of competence. The competence is worked with in respect to hierarchical recognition. The proposed teaching concept works with the concepts of information, knowledge and skills. The teaching proposal stems from the structure and contents of the IPMA standard elements. Furthermore, the paper elaborates the issue of embedding the elements of the IPMA standard competences into training courses. In the article, the eye of the IPMA competences is further enhanced with possible training courses and specialist areas in which the standard elements can thematically be included. The paper states that the competence elements and training courses cross one another and overlap in a manifold way. The authors also propose a way which could verify into what extent the students have actually acquired taught IPMA competence elements. The paper contains the proposal of feedback quantification for the IPMA standard and project management teaching. The results of the paper can be used as a starting premise for future research. Both the verification proposal and the embedding of the elements into teaching are derived from on-going academic experience of the authors of the article.

  20. 76 FR 8359 - Boulder Canyon Project

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Western Area Power Administration (Western) is proposing an adjustment to the Boulder Canyon Project (BCP... Reclamation Project Act of 1939 (43 U.S.C. 485h(c)), and other acts that specifically apply to the project...

  1. [Adverse events management. Methods and results of a development project].

    Science.gov (United States)

    Rabøl, Louise Isager; Jensen, Elisabeth Brøgger; Hellebek, Annemarie H; Pedersen, Beth Lilja

    2006-11-27

    This article describes the methods and results of a project in the Copenhagen Hospital Corporation (H:S) on preventing adverse events. The aim of the project was to raise awareness about patients' safety, test a reporting system for adverse events, develop and test methods of analysis of events and propagate ideas about how to prevent adverse events. H:S developed an action plan and a reporting system for adverse events, founded an organization and developed an educational program on theories and methods of learning from adverse events for both leaders and employees. During the three-year period from 1 January 2002 to 31 December 2004, the H:S staff reported 6011 adverse events. In the same period, the organization completed 92 root cause analyses. More than half of these dealt with events that had been optional to report, the other half events that had been mandatory to report. The number of reports and the front-line staff's attitude towards reporting shows that the H:S succeeded in founding a safety culture. Future work should be centred on developing and testing methods that will prevent adverse events from happening. The objective is to suggest and complete preventive initiatives which will help increase patient safety.

  2. 3D Information System of Historical Site – Proposal and Realisation of a Functional Prototype

    Directory of Open Access Journals (Sweden)

    J. Hodač

    2005-01-01

    Full Text Available The development of methods for 3D data acquisition, together with progress in information technologies raises the question of creating and using 3D models and 3D information systems (IS of historical sites and buildings. This paper presents the current state of the “Live Theatre” project. The theme of the project is the proposal and realisation of a 3D IS of the baroque theatre at Eeský Krumlov castle (UNESCO site.The project is divided into three main stages – creation of a 3D model, proposal of a conception for a 3D IS, and realisation of a functional prototype. 3D data was acquired by means of photogrammetric and surveying methods. An accurate 3D model (photo-realistic, textured was built up with MicroStation CAD system. The proposal of a conception of a 3D IS was the main outcome of the author’s dissertation. The essential feature of the proposed conception is the creation of subsystems targeted on three spheres – management, research and presentation of the site. The functionality of each subsystem is connected with its related sphere; however, each subsystem uses the same database. The present stage of the project involves making a functional prototype (with sample data. During this stage we are working on several basic technological topics. At present we are concerned with 3D data, its formats, format conversions (e.g. DGN _ VRML and its connection to other types of data. After that, we will be seeking a convenient technical solution based on network technologies (Internet and an appropriate layout for the data (database. The project is being carried out in close co-operation with the administration of the castle and some other partners. This stage of the project will be completed in December 2005.A functional prototype and the information acquired by testing it will form the basis for the final proposal of a complex IS of a historical site. The final proposal and appropriate technology will be the outcome of the project. The

  3. Influence of the South-North Water Diversion Project and the mitigation projects on the water quality of Han River.

    Science.gov (United States)

    Zhu, Y P; Zhang, H P; Chen, L; Zhao, J F

    2008-11-15

    Situated in the central part of China, the Han River Basin is undergoing rapid social and economic development with some human interventions to be made soon which will profoundly influence the water environment of the basin. The integrated MIKE 11 model system comprising of a rainfall-runoff model (NAM), a non-point load evaluation model (LOAD), a hydrodynamic model (MIKE 11 HD) and a water quality model (ECOLab) was applied to investigate the impact of the Middle Route of the South-North Water Diversion Project on the Han River and the effectiveness of the 2 proposed mitigation projects, the 22 wastewater treatment plants (WWTPs) and the Yangtze-Han Water Diversion Project. The study concludes that business as usual will lead to a continuing rapid deterioration of the water quality of the Han River. Implementation of the Middle Route of the South-North Water Diversion Project in 2010 will bring disastrous consequence in the form of the remarkably elevated pollution level and high risk of algae bloom in the middle and lower reaches. The proposed WWTPs will merely lower the pollution level in the reach by around 10%, while the Yangtze-Han Water Diversion Project can significantly improve the water quality in the downstream 200-km reach. The results reveal that serious water quality problem will emerge in the middle reach between Xiangfan and Qianjiang in the future. Implementation of the South-North Water Diversion Project (phase II) in 2030 will further exacerbate the problem. In order to effectively improve the water quality of the Han River, it is suggested that nutrient removal processes should be adopted in the proposed WWTPs, and the pollution load from the non-point sources, especially the load from the upstream Henan Province, should be effectively controlled.

  4. 78 FR 12334 - Proposed Collection; Comment Request: Federal Interagency Traumatic Brain Injury Research (FITBIR...

    Science.gov (United States)

    2013-02-22

    ... publish periodic summaries of proposed projects to be submitted to the Office of Management and Budget... Act of 1995, for opportunity for public comment on proposed data collection projects, the National... proposed collection of information, including the validity of the methodology and assumptions used; (3) The...

  5. Classifying IS Project Problems

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2006-01-01

    The literature contains many lists of IS project problems, often in the form of risk factors. The problems sometimes appear unordered and overlapping, which reduces their usefulness to practitioners as well as theoreticians. This paper proposes a list of criteria for formulating project problems...

  6. Separations innovative concepts: Project summary

    Energy Technology Data Exchange (ETDEWEB)

    Lee, V.E. (ed.)

    1988-05-01

    This project summary includes the results of 10 innovations that were funded under the US Department's Innovative Concept Programs. The concepts address innovations that can substantially reduce the energy used in industrial separations. Each paper describes the proposed concept, and discusses the concept's potential energy savings, market applications, technical feasibility, prior work and state of the art, and future development needs.

  7. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  8. Using Project Portfolio Management in a Junior Enterprise Technology

    Directory of Open Access Journals (Sweden)

    RIBEIRO, D. M.

    2011-06-01

    Full Text Available Junior Enterprises have their own particularities in managing of their projects. Scarcity of resources and lack of experience of its members are critics and typical factors in the daily life of these companies. However, these and other variables such as the time for return on investment, project complexity and runtime of the project, must be taken into consideration in the prioritization of the outstanding portfolio projects to maximize desired outcomes. The Portfolio Management aims to provide the company a better allocation of resources in an environment with multiple projects going simultaneously. The model proposed here seeks a link between projects and organizational strategy. In this Paper also are presented the results of applying the model on Upe consultoria JR.

  9. 75 FR 11997 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-03-12

    ... Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is... Trust as Part of an Estate (Sec. 1.645-1). DATES: Written comments should be received on or before May... INFORMATION: Title: Election to Treat Trust as Part of an Estate. OMB Number: 1545-1578. Regulation Project...

  10. In-house coordination project for organ and tissue procurement: social responsibility and promising results.

    Science.gov (United States)

    Silva, Vanessa Silva E; Moura, Luciana Carvalho; Martins, Luciana Ribeiro; Santos, Roberta Cristina Cardoso Dos; Schirmer, Janine; Roza, Bartira de Aguiar

    2016-01-01

    to report the results of evaluation regarding changes in the number of potential donor referrals, actual donors, and conversion rates after the implementation of an in-house organ and tissue donation for transplantation coordination project. epidemiological study, both retrospective and transversal, was performed with organ donation data from the Secretariat of Health for the State and the in-house organ donation coordination project of a beneficent hospital. The data was compared using nonparametric statistical Mann-Whitney test, and the Student's t-test, considering a significance level of 5% (p <0.05). there were statistically significant differences (p < 0.05), before and after the implementation of the project on the number of potential donor notification/month (3.05 - 4.7 ), number of actual donor/month (0.78 to 1.60) and rate of conversion ( 24.7 to 34.8 %). The hospitals 1, 2, 7 and 8 had significant results in potential donor, actual donor or conversion rate. the presence of an in-house coordinator is promising and beneficial, the specialist is important to change the indicators of efficiency, which consequently reduces the waiting lists for organ transplants.

  11. Hot Springs-Garrison Fiber Optic Project

    International Nuclear Information System (INIS)

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA's substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA

  12. Hot Springs-Garrison Fiber Optic Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA`s substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA.

  13. The Geoengineering Model Intercomparison Project (GeoMIP)

    KAUST Repository

    Kravitz, Ben

    2011-01-31

    To evaluate the effects of stratospheric geoengineering with sulphate aerosols, we propose standard forcing scenarios to be applied to multiple climate models to compare their results and determine the robustness of their responses. Thus far, different modeling groups have used different forcing scenarios for both global warming and geoengineering, complicating the comparison of results. We recommend four experiments to explore the extent to which geoengineering might offset climate change projected in some of the Climate Model Intercomparison Project 5 experiments. These experiments focus on stratospheric aerosols, but future experiments under this framework may focus on different means of geoengineering. © 2011 Royal Meteorological Society.

  14. GENIUS-TF - a test facility for the GENIUS project. Proposal

    International Nuclear Information System (INIS)

    Klapdor-Kleingrothaus, H.V.; Dietz, A.; Heusser, G.

    2001-02-01

    GENIUS is a proposal for a large scale detector of rare events. As a first step of the experiment, a small test version, the Genius Test-Facility is proposed to be built up at the Laboratori Nazionali del Gran Sasso (LNGS). With about 40 kg of natural Ge detectors operated in liquid nitrogen, Genius-TF could exclude (or directly confirm) the DAMA annual modulation signature within about two years of measurement using both, signal and signature of the claimed WIMP Dark matter. The funding of the experiment has already been approved and four 2.5 kg germanium detectors with an extreme low treshold of 500 eV have been produced. The installation can be started immediately. No additional space in the Underground Laboratory is required. (orig.)

  15. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  16. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  17. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  18. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  19. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  20. Chicago's urban forest ecosystem: results of the Chicago Urban Forest Climate Project

    Science.gov (United States)

    Gregory E. McPherson; David J. Nowak; Rowan A. Rowntree

    1994-01-01

    Results of the 3-year Chicago Urban Forest Climate Project indicate that there are an estimated 50.8 million trees in the Chicago area of Cook and DuPage Counties; 66 percent of these trees rated in good or excellent condition. During 1991, trees in the Chicago area removed an estimated 6,145 tons of air pollutants, providing air cleansing valued at $9.2 million...