  1. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  2. Development planning and appropriate technology: a dilemma and a proposal

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, G.

    1981-03-01

    This paper examines the present system of project paper preparation and project planning used by the US Agency for International Development and many donor agencies. Three approaches for meeting the evident weaknesses of the system - a holistic approach to the planning problem, an operant-conditioning approach to implementation, and a process approach to planning and implementation - are presented and critiqued. On the basis of the critique, an approach grounded in a search for an approximately appropriate technology is supported; and a proposal for an appropriate-technology evaluation system which would analyze alternative technologies, deliver information to the field level, supply needed information on technologies and implementation, constrain donor planners, reduce lag time, incorporate evaluations into future planning, and reduce dependence upon planners is presented. 66 references.

  3. The Environmental Advisory Service (EASe): a decision support system for comprehensive screening of local land-use development proposals and comparative evaluation of proposed land-use plans

    OpenAIRE

    K P White; A P Sage; F A Rodammer; C T Peters

    1985-01-01

    The Environmental Advisory Service (EASe) is a decision support system which can provide assistance to local planning agencies in selecting land-development alternatives or in formulating land-use plans. EASe offers a comprehensive and consistent procedure for rating either a development proposal or a proposed plan. This procedure is based upon qualitative assessments of the impact of developments or plans on the natural environment, zoning and land use. public and private services, transport...

  4. Sustainability assessment: a tool for planning for sustainability as a desired outcome for a proposed development

    CSIR Research Space (South Africa)

    Haywood, L

    2009-08-01

    Full Text Available This paper presents a theoretical framework for planning for sustainability for any proposed development project. The objective of this framework is to foster and preserve the social ecological system in which the proposed development project...

  5. Proposal for development of a system for planning radiotherapy of gliomas

    International Nuclear Information System (INIS)

    Caldeira, Alexandre D.

    2015-01-01

    In the last three years, discussions were held on several topics in Nuclear Medicine area, starting with the nuclear data processing, passing by deterministic and stochastic mathematical methods, and finalizing with computer simulations of the following phenomena: neutron transport, applied to boron neutron capture therapy, and neutron diffusion, to study growth of tumor cells. From a mathematical model applied to radiotherapy of gliomas available in literature, it is proposed a strategy for development of a computer system to assist the planning radiotherapy of gliomas. (author)

  6. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  7. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    The updating of the Action Plan for Energy Efficiency is closely related to the need to further intensify measures for promoting energy conservation that was highlighted in the debate in Parliament on the National Climate Strategy and building of a new nuclear power plant. The Working Group with responsibility for the preparation of the updating has made an assessment of the implementation and impact of the previous Action Plan for Energy Efficiency and sought to come up with new measures and ways of increasing the effect of the actions in the previous action plan. The main instruments presented in the updated action plan are developing new technologies, economic instruments, energy conservation agreements, laws and regulations and information and training. The action plan comprises proposals for increasing the budget for energy subsidies for companies and bodies and finding new formulas for the funding of energy saving investments. Further, the aid for the renovation of buildings is proposed to be enhanced. More effort is also needed as concerns disseminating information on energy saving. The development of new technologies requires that the funding from the National Technology Agency (Tekes) for energy efficiency is kept at least at the level of 1999. An implementation of the measures proposed would require a contribution from the state amounting to about E 80 million per year. The system of Energy Conservation Agreements is proposed to be further extended and developed. The agreements could to a larger extent than before cover research and product development processes and processes for purchasing of goods and services. The Working Group proposes further examination of the possibility of imposing binding targets and applying sanctions. Energy taxation is proposed to be developed further in order to promote energy saving and co- generation with the impact of the future Directive on emission allowance trading in mind. New research and development projects are

  8. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  9. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of shaft liner tests as part of the large shaft development test proposed for the Hanford Site in support of the repository development program. The objectives of these tests are to develop techniques for measuring liner alignment (straightness), both construction assembly alignment and downhole cumulative alignment, and to assess the alignment information as a real time feedback to aid the installation procedure. The test plan is based upon installing a 16 foot ID shaft liner into a 20 foot diameter shaft to a depth of 1000 feet. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs

  10. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  11. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  12. Proposed plan for critical experiments supporting thorium fuel cycle development

    International Nuclear Information System (INIS)

    Gore, B.F.

    1978-09-01

    A preliminary plan is proposed for critical experiments to provide data needed for the recycle of thorium based nuclear fuels. The sequence of experimentation starts with well moderated solutions followed by highly concentrated low moderated solutions. It then progresses through lattices moderated by water, by water plus soluble poisons, and by fissile solutions, to solutions poisoned by raschig rings and soluble poisons. Final experiments would treat lattices moderated by poisoned fissile solution, and arrays of stored fissile units

  13. Ecological planning proposal for Kruger National Park

    Science.gov (United States)

    van Riet, W. F.; Cooks, J.

    1990-05-01

    This article discusses an application of the ecological planning model proposed by Van Riet and Cooks. The various steps outlined in this model have been applied to Kruger National Park in South Africa. The natural features of Kruger National Park, which form the basis of such an ecological planning exercise and from which the various land use categories, values, and zoning classes can be determined, are discussed in detail. The suitability of each of the various features is analyzed and a final zoning proposal for Kruger National Park is suggested. Furthermore a method for selecting a site for a new camp is illustrated by referring to the site for the new Mopane rest camp which is now under construction in the Kruger National Park. The conclusion is reached that the proposed ecological planning model can be used successfully in planning conservation areas such as Kruger National Park and for the selection of the most desirable sites for the establishment of new rest camps. Its suitability as a practical model in such planning exercises is proven by the fact that the siting proposals of two new camps based on this model have been accepted by the National Parks Board, the controlling body of Kruger National Park.

  14. Proposed Site Treatment Plan (PSTP). STP reference document

    International Nuclear Information System (INIS)

    1995-01-01

    The Department of Energy (DOE) is required by Section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (FFCAct), to prepare a plan describing the development of treatment capacities and technologies for treating mixed waste (hazardous/radioactive waste). DOE decided to prepare its site treatment plan in a three phased approach. The first phase, called the Conceptual Site Treatment Plan (CSTP), was issued in October 1993. At the Savannah River Site (SRS) the CSTP described mixed waste streams generated at SRS and listed treatment scenarios for each waste stream utilizing an onsite, offsite DOE, and offsite or onsite commercial or vendor treatment option. The CSTP is followed by the Draft Site Treatment Plan (DSTP), due to be issued in August 1994. The DSTP, the current activity., will narrow the options discussed in the CSTP to a preferred treatment option, if possible, and will include waste streams proposed to be shipped to SRS from other DOE facilities as well as waste streams SRS may send offsite for treatment. The SRS DSTP process has been designed to address treatment options for each of the site's mixed waste streams. The SRS Proposed Site Treatment Plan (PSTP) is due to be issued in February 1995. The compliance order would be derived from the PSTP

  15. Federal Facility Compliance Act, Proposed Site Treatment Plan: Background Volume. Executive Summary

    International Nuclear Information System (INIS)

    1995-01-01

    This Federal Facility Compliance Act Site Treatment Plan discusses the options of radioactive waste management for Ames Laboratory. This is the background volume which discusses: site history and mission; framework for developing site treatment plans; proposed plan organization and related activities; characterization of mixed waste and waste minimization; low level mixed waste streams and the proposed treatment approach; future generation of TRU and mixed wastes; the adequacy of mixed waste storage facilities; and a summary of the overall DOE activity in the area of disposal of mixed waste treatment residuals

  16. Large shaft development test plan

    International Nuclear Information System (INIS)

    Krug, A.D.

    1984-03-01

    This test plan proposes the conduct of a large shaft development test at the Hanford site in support of the repository development program. The purpose and objective of the test plan is to obtain the information necessary to establish feasibility and to predict the performance of the drilling system used to drill large diameter shafts. The test plan is based upon drilling a 20 ft diameter shaft to a depth of 1,000 feet. The test plan specifies series of tests to evaluate the performance of the downhole assembly, the performance of the rig, and the ability of the system to cope with geologic hazards. The quality of the hole produced will also be determined. This test plan is considered to be preliminary in that it was prepared as input for the decision to determine if development testing is required in this area. Should the decision be made to proceed with development testing, this test plan shall be updated and revised. 6 refs., 2 figs., 3 tabs

  17. IDC Re-Engineering Phase 3 Development Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Burns, John F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pollock, David L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  18. IDC Re-Engineering Phase 3 Development Plan

    International Nuclear Information System (INIS)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  19. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  20. National spatial development planning in South Africa 1930-2010 ...

    African Journals Online (AJOL)

    National spatial development planning in South Africa 1930-2010: An introductory comparative analysis. ... Town and Regional Planning ... It demonstrates that, despite the ostensible support for national planning during this period, such plans and proposals rarely had a direct impact on the conduct of government business.

  1. An environmental pressure index proposal for urban development planning based on the analytic network process

    International Nuclear Information System (INIS)

    Gomez-Navarro, Tomas; Garcia-Melon, Monica; Acuna-Dutra, Silvia; Diaz-Martin, Diego

    2009-01-01

    This paper introduces a new approach to prioritize urban planning projects according to their environmental pressure in an efficient and reliable way. It is based on the combination of three procedures: (i) the use of environmental pressure indicators, (ii) the aggregation of the indicators in an Environmental Pressure Index by means of the Analytic Network Process method (ANP) and (iii) the interpretation of the information obtained from the experts during the decision-making process. The method has been applied to a proposal for urban development of La Carlota airport in Caracas (Venezuela). There are three options which are currently under evaluation. They include a Health Club, a Residential Area and a Theme Park. After a selection process the experts chose the following environmental pressure indicators as ANP criteria for the project life cycle: used land area, population density, energy consumption, water consumption and waste generation. By using goal-oriented questionnaires designed by the authors, the experts determined the importance of the criteria, the relationships among criteria, and the relationships between the criteria and the urban development alternatives. The resulting data showed that water consumption is the most important environmental pressure factor, and the Theme Park project is by far the urban development alternative which exerts the least environmental pressure on the area. The participating experts coincided in appreciating the technique proposed in this paper is useful and, for ranking ordering these alternatives, an improvement from traditional techniques such as environmental impact studies, life-cycle analysis, etc.

  2. Proposed plan for the development of advanced instrumentation and control technology in Korea

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Ham, Chang-Shik

    1995-01-01

    All of the nuclear power plants in Korea are operating with analog instrumentation and control (I and C) equipment which are increasingly faced with frequent troubles, obsolescence and high maintenance expense. Electrical and computer technology has improved rapidly in recent years and has been applied to other industries. So it is strongly recommended to adopt the modern digital and computer technology to improve plant safety and availability. The plan, which is aimed at replacement of existing I and C systems, and at improving planned as well as next generation digital I and C systems is divided into three major parts: (1) Plan for domestic design of I and C systems and components, (2) Plan for domestic manufacturing of I and C equipment, and (3) Plan for development of future technologies. This plan provides advanced digital I and C requirements equivalent to Electric Power Research Institute Utility Requirements Document (Chapter 10) Man Machine Interface Systems. Also this plan includes the critical issue of digital I and C, namely software verification and validation strategy. (6 refs., 1 fig., 2 tabs.)

  3. Analysis of Propagation Plans in NSF-Funded Education Development Projects

    Science.gov (United States)

    Stanford, Courtney; Cole, Renee; Froyd, Jeff; Henderson, Charles; Friedrichsen, Debra; Khatri, Raina

    2017-08-01

    Increasing adoption and adaptation of promising instructional strategies and materials has been identified as a critical component needed to improve science, technology, engineering, and mathematics (STEM) education. This paper examines typical propagation practices and resulting outcomes of proposals written by developers of educational innovations. These proposals were analyzed using the Designing for Sustained Adoption Assessment Instrument (DSAAI), an instrument developed to evaluate propagation plans, and the results used to predict the likelihood that a successful project would result in adoption by others. We found that few education developers propose strong propagation plans. Afterwards, a follow-up analysis was conducted to see which propagation strategies developers actually used to help develop, disseminate, and support their innovations. A web search and interviews with principal investigators were used to determine the degree to which propagation plans were actually implemented and to estimate adoption of the innovations. In this study, we analyzed 71 education development proposals funded by the National Science Foundation and predicted that 80% would be unsuccessful in propagating their innovations. Follow-up data collection with a subset of these suggests that the predictions were reasonably accurate.

  4. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  5. Proposed Hydro-Quebec development plan, 1990-1992: Horizon 1999

    International Nuclear Information System (INIS)

    1990-01-01

    The supply and demand for electric power in Quebec are reviewed and forecasts of future demand are established, using various scenarios of demographic, economic, and energy development. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. In addition, objectives and strategies are presented for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 36 figs., 54 tabs

  6. Planning of community heating systems modernization and development

    International Nuclear Information System (INIS)

    Mroz, Tomasz M.

    2008-01-01

    New approach to community heating systems modernization and development planning process has been proposed. It is based on the general decision making aid algorithm. The proposed algorithm takes into account both demand and supply side of community heat market modernization and development. The first step of algorithm - analytical step, refers to data base creation, which is needed for the description of community heating system energy, ecology and economic characteristics. Analysis of those characteristics allows for the identification of heating system market modernization and development potential scenarios. The second algorithm step - decision step, allows for the identification of the most compromise scenarios of system modernization and development. To make the planning process more transparent and to increase the influence of decision makers on the planning process the ELECTRE III method was chosen as the tool of decision aid. The ELECTRE III method is based on the construction of outranking relation and definition of pseudo-criterion. The iteration mode of method application allows the decision maker and analyst for the investigation of the sensitivity of final solution to the changing preference model. One of the methods of statistics - the creditability of mean range method was used for the determination of initial definition of pseudo-criterion. Proposed algorithm and decision aid method were employed for the case study analysis referring to the choice of the heating system for new developing urban area. (author)

  7. Proposal of a nuclear cycle research and development plan in Tokai works. The roadmap from LWR cycle to FBR cycle

    International Nuclear Information System (INIS)

    Nakamura, Hirofumi; Abe, Tomoyuki; Kashimura, Takuo; Nagai, Toshihisa; Maeda, Seichiro; Yamaguchi, Toshiya; Kuroki, Ryoichiro

    2003-07-01

    The Generation-II Project Task Force Team has investigated a research and development plan of a future nuclear fuel cycle in Tokai works for about three months from December 19, 2002. First we have discussed about the present condition of Japanese nuclear fuel cycle and have recognized it as the following. The relation of the technology between the LWR-cycle and the FBR-cycle is not clear. MOX Fuel Use in Light Water Reactors is important to establish technology of the FBR fuel cycle. Radioactive waste disposal issue is urgent. Next we have proposed the three basic policies on R and D plan of nuclear fuel cycle in consideration of the F.S. on FBR-cycle. Establishment and advancement of 'the tough nuclear fuel cycle'. Early establishment of the FBR cycle technology to be able to supply energy stably for long-term. Establishment of the radioactive waste treatment and disposal technology, and optimization of nuclear fuel cycle technology from the viewpoint of radioactive waste. And we have proposed the Japanese technical holder system to integrate all LWR and FBR cycle technology. (author)

  8. ISV technology development plan for buried waste

    International Nuclear Information System (INIS)

    Nickelson, D.F.; Callow, R.A.; Luey, J.K.

    1992-07-01

    This report identifies the main technical issues facing the in situ vitrification (ISV) application to buried waste, and presents a plan showing the top-level schedule and projected resources needed to develop and demonstrate the technology for meeting Environmental Restoration Department (ERD) needs. The plan also proposes a model strategy for the technology transfer from the Department of Energy's Office of Technology Development (DOE-OTD) to the Office of Environmental Restoration (DOE-ER) as the technology proceeds from issues resolution (development) to demonstration and remedial readiness. Implementation of the plan would require $34,91 1K in total funding to be spread in the years FY-93 through FY-98. Of this amount, $10,183K is planned to be funded by DOE-OTD through the ISV Integrated Program. The remaining amount, $24,728K, is recommended to be split between the Department of Energy (DOE) Office of Technology Development ($6,670K) and DOE Office of Environmental Restoration ($18,058K)

  9. CMS proposes prioritizing patient preferences, linking patients to follow-up care in discharge planning process.

    Science.gov (United States)

    2016-03-01

    Hospital providers voice concerns about a proposed rule by the Centers for Medicare and Medicaid Services (CMS) that would require providers to devote more resources to discharge planning. The rule would apply to inpatients as well as emergency patients requiring comprehensive discharge plans as opposed to discharge instructions. CMS states that the rule would ensure the prioritization of patient preferences and goals in the discharge planning process, and also would prevent avoidable complications and readmissions. However, hospital and emergency medicine leaders worry that community resources are not yet in place to facilitate the links and follow-up required in the proposed rule, and that the costs associated with implementation would be prohibitive. The proposed rule would apply to acute care hospitals, EDs, long-term care facilities, inpatient rehabilitation centers, and home health agencies. Regardless of the setting, though, CMS is driving home the message that patient preferences should be given more weight during the discharge planning process. Under the rule, hospitals or EDs would need to develop a patient-centered discharge plan within 24 hours of admission or registration, and complete the plan prior to discharge or transfer to another facility. Under the rule, emergency physicians would determine which patients require a comprehensive discharge plan. Both the American Hospital Association and the American College of Emergency Physicians worry that hospitals will have to take on more staff, invest in training, and make changes to their electronic medical record systems to implement the provisions in the proposed rule.

  10. Demographic, Employment and Development Trends: The Need for Integrated Planning.

    Science.gov (United States)

    Farooq, Ghazi M.; MacKellar, F. Landis

    1990-01-01

    The authors contend that problems associated with rapid population growth in developing countries must be tackled through comprehensive planning. They discuss impacts of demography on labor supply and demand and migration. Then they propose a practical framework for population and human resource development planning and policy formation. (SK)

  11. Foresight as an e-Government Development Planning Component: Proposed e-Government Foresight Framework

    Directory of Open Access Journals (Sweden)

    Rokas Grincevičius

    2012-07-01

    Full Text Available Despite the fact that e-government is developed by a country which is making the first steps in this area, or state, seeking to increase effectiveness of the existing e-government tools, it is necessary to have the methodology to create a basis for the formation of strategic e-government decisions, whose implementation will meet existing citizen needs and emerged challenges which appear during continuous information communication technology transformation processes.One of the ways to respond to these requirements is the application of foresight exercises as a component of strategic e-government planning. Nevertheless in Lithuania and many other Eastern European countries, the planning process is still centralized, based on the five-year planning context. Ex communist states are behind other regions with the number of research based on the foresight methodology, so these conditions determine the lack of information in this domain and this article is a small part of the attempt to fill the existing vacuum.The main aim of this article is to analyse the foresight impact on the electronic government strategic planning process, its role in the political decision formation process and by identifying contact points of different foresight research components, in the context of e-government foresight methodology framework creation processes, to form a deeper perception on how foresight works as a system.This aim is determined by the following objectives—to analyse foresight concept, circumstances and causes of its origin, main guidelines, methods used during foresight exercises and reasons, which determine its application; also, to analyse different suggested foresight exercise approaches and according to the results of the analysis, to form a distinctive e-government foresight methodology, which can be used for already performed foresight analysis or for prototyping a planned one.Thus, the first part of the article covers the most important theoretical

  12. Development of a nurse case management service: a proposed business plan for rural hospitals.

    Science.gov (United States)

    Adams, Marsha Howell; Crow, Carolyn S

    2005-01-01

    The nurse case management service (NCMS) for rural hospitals is an entrepreneurial endeavor designed to provide rural patients with quality, cost-effective healthcare. This article describes the development of an NCMS. A detailed marketing and financial plan, a review of industry trends, and the legal structure and risks associated with the development of the venture are presented. The financial plan projects a minimum savings of 223,200 dollars for rural institutions annually. To improve quality and reduce cost for rural hospitals, the authors recommend implementation of an NCMS.

  13. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  14. Final Report - Development of a Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Maracas, Kate; Hooks, Todd

    2006-11-30

    The Agua Caliente Band of Cahuilla Indians was awarded a grant under the U.S. Department of Energy’s (“DOE”) Tribal Energy Program to develop a comprehensive Tribal energy plan. The grant, awarded under DOE’s First Steps program, supported the development of a strategic energy plan that integrates with the Tribe’s overall planning and economic development goals, and aligns with Tribal cultural, social, political, and spiritual values. The Tribe set out to incorporate its energy plan into (i) a broader economic development strategy developed by investigators at the University of California at Riverside, and (ii) the overarching goals for job-creation and wealth-creation that are held by both the Tribe and the surrounding Coachella Valley. With these wide-ranging objectives in mind, the Tribe and its consultant, Red Mountain Energy Partners, engaged in a phased approach to creating the strategic energy plan. As illustrated in Figure 1 below, the proposed approach involved both “serial” and “parallel” activities. The capacity-building component of this approach occurred throughout the duration of the project period.

  15. Global Nuclear Energy Partnership Technology Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    David J. Hill

    2007-07-01

    This plan describes the GNEP Technology Demonstration Program (GNEP-TDP). It has been prepared to guide the development of integrated plans and budgets for realizing the domestic portion of the GNEP vision as well as providing the basis for developing international cooperation. Beginning with the GNEP overall goals, it describes the basic technical objectives for each element of the program, summarizes the technology status and identifies the areas of greatest technical risk. On this basis a proposed technology demonstration program is described that can deliver the required information for a Secretarial decision in the summer of 2008 and support construction of facilities.

  16. 76 FR 6727 - Proposed Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To...

    Science.gov (United States)

    2011-02-08

    ... location. Written comments will be accepted through the close of business on March 16, 2011. Locations: The... Regulations, Water Code and Comprehensive Plan To Provide for Regulation of Natural Gas Development Projects... proposed rule containing tentative dates and locations for public hearings on proposed amendments to its...

  17. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  18. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  19. Review of the proposed Strategic National Plan for Civilian Nuclear Reactor Development: Volume 1

    International Nuclear Information System (INIS)

    1986-10-01

    On August 9, 1985, the Secretary of Energy requested that the Chairman of the Energy Research Advisory Board establish an ad-hoc Panel to review a draft ''Strategic National Plan for Civilian Nuclear Reactor Development.'' The resulting report, approved by the Board, contains suggestions for improving the draft plan and also contains major recommendations for alleviating the several institutional barriers that appear to preclude the construction of any new nuclear power plants in this country

  20. Planning for energy resource development

    Energy Technology Data Exchange (ETDEWEB)

    Magai, B S [Dept. of Mech. Eng., IIT Bombay, India

    1975-01-01

    A general review is provided of the national energy resources of India. They include wind power, tidal power, geothermal energy, and nuclear fission and fusion. Their present (1975) contribution to India's total energy requirements and the possibility of their accelerated development and impact on the national economy are discussed. Due to the serious proportions which the energy situation is assuming, it is suggested that a national energy council be set up within the Ministry of Energy to review all matters pertaining to energy, and to assume planning and evaluation responsibilities. It is also recommended that a Department of Energy Research, Development, and Demonstration be established as an autonomous agency which would carry out programs in utilization, conservation, environment, economics, and education. Present efforts by various ministries are fragmented and diverge in policy, leadership, and planning. It is believed that the proposed organizations would coordinate energy programs with national objectives.

  1. Developing a Markup Language for Encoding Graphic Content in Plan Documents

    Science.gov (United States)

    Li, Jinghuan

    2009-01-01

    While deliberating and making decisions, participants in urban development processes need easy access to the pertinent content scattered among different plans. A Planning Markup Language (PML) has been proposed to represent the underlying structure of plans in an XML-compliant way. However, PML currently covers only textual information and lacks…

  2. A Practice of Secure Development and Operational Environment Plan

    International Nuclear Information System (INIS)

    Park, Jaekwan; Seo, Sangmun; Suh, Yongsukl; Park, Cheol

    2017-01-01

    This paper suggests a practice of plan for SDOE establishment in a nuclear I and C. First, it is necessary to perform a requirements analysis to define key regulatory issues and determine the target systems. The analysis includes a survey to find out the applicable measures credited internationally. Based on the analysis results, this paper proposes an implementation plan including a process harmonizing security activities with legacy software activities and applicable technical, operational, and management measures for target systems. Recently, nuclear I and C has been faced with two security issues, cyber security (CS) and secure development and operational environment (SDOE). Unlike cyber security, few studies on planning SDOE have been presented. This paper suggests a plan for establishing an SDOE in a nuclear I and C. This paper defines three key considerations to comply with the regulatory position of RG. 1.152(R3) and proposes a process harmonizing the security activities with legacy software activities. In addition, this paper proposes technical, operational, and management measures applicable for SDOE.

  3. The Normative and Legal Mechanism for Provision of the Strategic Planning of Regional Development

    Directory of Open Access Journals (Sweden)

    Kuharskaya Natalia O.

    2018-01-01

    Full Text Available The normative and legal provision of the strategic planning of regional development is presented. Features of strategic planning at the regional level in modern conditions are considered. The problems that prevent the use of the system of strategic planning without giving an opportunity both to develop significant plans and to ensure their realization were analyzed. It has been determined that Ukraine as a whole has a normative and legal base for the efficient development of regions, but it requires systematization and harmonization, as some issues are still unresolved. Proposals for further improvement of institutional mechanisms of strategic planning at the regional level are presented, which will improve the quality of development of strategic documents in the process of adoption of managerial decisions. Prospect for further research is the formation of scientifically substantiated proposals to improve the legislation regulating the issues of planning and implementation of strategies for socio-economic development of regions.

  4. 30 CFR 250.251 - If I propose activities in the Alaska OCS Region, what planning information must accompany the DPP?

    Science.gov (United States)

    2010-07-01

    ... Region, what planning information must accompany the DPP? 250.251 Section 250.251 Mineral Resources... Region, what planning information must accompany the DPP? If you propose development and production activities in the Alaska OCS Region, the following planning information must accompany your DPP: (a...

  5. 77 FR 16541 - Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy...

    Science.gov (United States)

    2012-03-21

    ...). Grants are made to Institutions of Higher Education that have entered into consortium arrangements with... DEPARTMENT OF EDUCATION Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy Development; Case Studies of Current and Former Grantees of the Title III National...

  6. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    Jiang Zengqiang; Liu Mingzhou; Zhao Han; Ge Maogen; Guo Jia

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified, and the tasks are then optimized by the corresponding algorithms. The optimal tasks plan will reduce the development time and cost. Considering the practical requirements in real world, a Multilayer DSM is proposed, and its information communication techniques between DSM and traversing principle are described in details.

  7. Strategic Planning for the Development of the Danube Area

    Directory of Open Access Journals (Sweden)

    ANTONIO VALENTIN TACHE

    2014-12-01

    Full Text Available The article includes concepts, information, methodologies of spatial planning focused on the Danube carried out within the European projects "Donauregionen" and "Donauregionen+", financed by the European Union through the South East Europe Transnational Cooperation Programme. The article proposes solutions for solving problems related to the opportunities offered by the Danube as an important corridor to support the economic growth and competitiveness of functional regions in the Danube area. The current situation in the Danube River riparian land-use planning policies involves (a creating the spatial concept of the Danube area interregional level, b developing integrated strategies to develop sectoral strategies embodied in the Danube area, the Transdanube strategy and development strategies for the Danube region as a whole. In this general scheme, indicators have been proposed, designed on four main areas (natural conditions, housing and human resources, technical infrastructure and transport, and economy. Based on the analyses conducted in the project, five Danube sub-regions and 19 Transdanube regions were established. Using the forecasting methodology proposed in the “Donauregionen+” project, three types of scenarios were developed for each sub-region: pessimistic, realistic and optimistic. All these scenarios have resulted in GIS cartograms, based on groups of territorial indicators that highlight the socio-economic development capacity of the Danube sub-regions.

  8. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  9. 77 FR 16862 - Proposed Information Collection Request; Training, Training Plans, and Records

    Science.gov (United States)

    2012-03-22

    ...; Training, Training Plans, and Records AGENCY: Mine Safety and Health Administration, Labor. ACTION: Request... proposed extension of the information collection related to training, training plans, and records at these.... Agency: Mine Safety and Health Administration. Title: Part 46--Training, Training Plans, and Records. OMB...

  10. Development process for integrated water resources management plan under a bottom-up participation perspective

    Directory of Open Access Journals (Sweden)

    Kittiwet Kuntiyawichai

    2014-06-01

    Full Text Available This article presents the development process for the integrated water resources management and development plan of Maha Sarakham Province by considering the priority and urgency of water problem issues. Gathering feedback from stakeholders and prioritizing water management and development projects are also taken into consideration. In view of integrated plans, the project is classified into short-, medium- and long-term plans with the project duration of 2 years, 3 years and 5 years, respectively. In this case, the plans can be categorized into proposed provincial and local plans. Firstly, the comprehensive provincial plans can be divided into 2 groups, i.e. district plans with the total number of 532 plans, which comprise of 505 projects for coping with drought and 27 projects for flood mitigation, and provincial plans from 13 agencies with the amount of 513 projects, which include 396 projects and 117 projects for dealing with drought and flood, respectively. Secondly, there are 4,099 of local plans to be put in place, in which 3,973 projects and 126 projects are proposed to handle drought and flood problems, respectively. From the analysis, it is found that if all planned drought relief projects are implemented, the water demand for domestic and agricultural needs could be covered by 96% and 51%, respectively. In case of the entire proposed flood alleviation projects are executed, 29% of the total flood prone areas can be effectively protected.

  11. Development and Application of a Low Impact Development (LID-Based District Unit Planning Model

    Directory of Open Access Journals (Sweden)

    Cheol Hee Son

    2017-01-01

    Full Text Available The purpose of this study was to develop a low impact development-based district unit planning (LID-DP model and to verify the model by applying it to a test site. To develop the model, we identified various barriers to the urban planning process and examined the advantages of various LID-related techniques to determine where in the urban development process LID would provide the greatest benefit. The resulting model provides (1 a set of district unit planning processes that consider LID standards and (2 a set of evaluation methods that measure the benefits of the LID-DP model over standard urban development practices. The developed LID-DP process is composed of status analysis, comprehensive analysis, basic plan, and sectoral plans. To determine whether the LID-DP model met the proposed LID targets, we applied the model to a test site in Cheongju City, Chungcheongbuk-do Province, Republic of Korea. The test simulation showed that the LID-DP plan reduced nonpoint source pollutants (total nitrogen, 113%; total phosphorous, 193%; and biological oxygen demand, 199%; reduced rainfall runoff (infiltration volume, 102%; surface runoff, 101%; and improved the conservation rate of the natural environment area (132%. The successful application of this model also lent support for the greater importance of non-structural techniques over structural techniques in urban planning when taking ecological factors into account.

  12. Proposed research and development plan for mixed low-level waste forms

    Energy Technology Data Exchange (ETDEWEB)

    O`Holleran, T.O.; Feng, X.; Kalb, P. [and others

    1996-12-01

    The objective of this report is to recommend a waste form program plan that addresses waste form issues for mixed low-level waste (MLLW). The report compares the suitability of proposed waste forms for immobilizing MLLW in preparation for permanent near-surface disposal and relates them to their impact on the U.S. Department of Energy`s mixed waste mission. Waste forms are classified into four categories: high-temperature waste forms, hydraulic cements, encapsulants, and specialty waste forms. Waste forms are evaluated concerning their ability to immobilize MLLW under certain test conditions established by regulatory agencies and research institutions. The tests focused mainly on leach rate and compressive strength. Results indicate that all of the waste forms considered can be tailored to give satisfactory performance immobilizing large fractions of the Department`s MLLW inventory. Final waste form selection will ultimately be determined by the interaction of other, often nontechnical factors, such as economics and politics. As a result of this report, three top-level programmatic needs have been identified: (1) a basic set of requirements for waste package performance and disposal; (2) standardized tests for determining waste form performance and suitability for disposal; and (3) engineering experience operating production-scale treatment and disposal systems for MLLW.

  13. Proposed research and development plan for mixed low-level waste forms

    International Nuclear Information System (INIS)

    O'Holleran, T.O.; Feng, X.; Kalb, P.

    1996-12-01

    The objective of this report is to recommend a waste form program plan that addresses waste form issues for mixed low-level waste (MLLW). The report compares the suitability of proposed waste forms for immobilizing MLLW in preparation for permanent near-surface disposal and relates them to their impact on the U.S. Department of Energy's mixed waste mission. Waste forms are classified into four categories: high-temperature waste forms, hydraulic cements, encapsulants, and specialty waste forms. Waste forms are evaluated concerning their ability to immobilize MLLW under certain test conditions established by regulatory agencies and research institutions. The tests focused mainly on leach rate and compressive strength. Results indicate that all of the waste forms considered can be tailored to give satisfactory performance immobilizing large fractions of the Department's MLLW inventory. Final waste form selection will ultimately be determined by the interaction of other, often nontechnical factors, such as economics and politics. As a result of this report, three top-level programmatic needs have been identified: (1) a basic set of requirements for waste package performance and disposal; (2) standardized tests for determining waste form performance and suitability for disposal; and (3) engineering experience operating production-scale treatment and disposal systems for MLLW

  14. Savannah River Site mixed waste Proposed Site Treatment Plan (PSTP). Volumes 1 and 2 and reference document: Revision 2

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.; Bailey, L.L.

    1995-01-01

    The DOE is required by the Resource Conservation and Recovery Act to prepare site treatment plans describing the development of treatment capacities and technologies for treating mixed waste. This proposed plan contains Savannah River Site's preferred options and schedules for constructing new facilities, and otherwise obtaining treatment for mixed wastes. The proposed plan consists of 2 volumes. Volume 1, Compliance Plan, identifies the capacity to be developed and the schedules as required. Volume 2, Background, provides a detailed discussion of the preferred options with technical basis, plus a description of the specific waste streams. Chapters are: Introduction; Methodology; Mixed low level waste streams; Mixed transuranic waste; High level waste; Future generation of mixed waste streams; Storage; Process for evaluation of disposal issues in support of the site treatment plans discussions; Treatment facilities and treatment technologies; Offsite waste streams for which SRS treatment is the Preferred Option (Naval reactor wastes); Summary information; and Acronyms and glossary. This revision does not contain the complete revised report, but only those pages that have been revised

  15. New transmission planning methodology for requesting proposals for wind generation

    Science.gov (United States)

    Isaacs, Andrew L.

    The increasing interest in renewable energy technologies during the last decade has caused conventional transmission and generation expansion planning methodologies to be strained and in some cases abandoned. This is due both to the quantity of generator interconnection requests and the constraints imposed by deregulated energy industry structures. One technique used to control the influx of renewable generation while maintaining competitive principles is a Request for Proposals (RFP). However, lack of transmission planning due to a disconnection between generation and transmission owners, difficulty in identifying viable projects, and high risk for proponents stand as obstacles to the goals of an RFP. This research proposes a procedure which minimizes the effect of these obstacles; meeting the purchaser requirements for low price and combining conventional planning concepts with feedback from competitive structures. The general features of the method include definition of generation limits and study area, expansion plan design, transmission cost evaluation, optimal selection of requested generation levels, and final selection of successful proponents. The method is shown to be effective in creating an RFP where proponents are well-informed and provided with cost certainty to reduce bid price, buyers are able to determine end costs of their energy, and good expansion planning principles are maintained. A case study using a real system in New Mexico demonstrates these concepts.

  16. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  17. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  18. Proposed plan for the Tank 105-C Hazardous Waste Management Facility. Revision 1

    International Nuclear Information System (INIS)

    Miles, W.C. Jr.

    1994-01-01

    This Proposed Plan was developed to describe the remedial action selected at the Tank 105-C Hazardous Waste Management Facility (HWMF) source-specific unit within the C-Area Fundamental Study Area (FSA) at the Savannah River Site (SRS) and to fulfill Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. This 8,400 gallon capacity tank was certified and accepted closed according to a closure plan approved by the state of South Carolina under the Resource Conservation and Recovery Act (RCRA) authority in January 1991. As a result of the closure, previously performed under RCRA, the unit poses no current or potential threat to human health or the environment. Accordingly, no further remedial action is necessary under CERCLA

  19. Proposed business plan for energy efficiency in Brazil

    International Nuclear Information System (INIS)

    De Oliveira, Lilian Silva; Shayani, Rafael Amaral; De Oliveira, Marco Aurelio Gonçalves

    2013-01-01

    The Brazilian Ministry of Mines and Energy published the National Energy and Efficiency Plan, which calls for electricity savings of 10% by 2030. At first sight, the projected goal does not seem too ambitious, but this figure is nearly eighteen times the known historical savings for the country. Adjustments need to be made to the current energy efficiency business plan. This article suggests what should be changed in order to make the program more attractive and effective. These include changes on its organizational structure, legislation, verification of results and transparency. The new plan aims to eliminate some existing barriers and introduce new mechanisms that should help the country meet its future goals. - Highlights: • Brazil's successful efficiency program was presented, including the government's goal to increase the savings 25 times until 2030. • To achieve this huge goal, the national energy efficiency program needs a new approach, including new institutional arrangements. • These arrangements proposals are the useful contribution from this paper

  20. Proposals for enhancing tactical planning in grocery retailing with S&OP

    DEFF Research Database (Denmark)

    Dreyer, Heidi Carin; Kiil, Kasper; Dukovska-Popovska, Iskra

    2018-01-01

    Purpose-The purpose of this paper is to explore tactical planning in grocery retailing and propose how process and integration mechanisms from sales and operations planning (S&OP) can enhance retail tactical planning.Design/methodology/approach-This work follows an explorative design with case...... studies from the grocery retailing industry in Finland, Norway, and the UK.Findings-The tactical planning process focuses on demand management and securing product availability from suppliers in order to reach sales targets. Less attention is directed toward balancing supply and demand or toward providing...... a single plan to guide company operations. Planning appeared to be functionally oriented with limited coordination between functional plans, but it did include external integration that improved forecast accuracy.Research limitations/implications-The study involves grocery retailer cases with variable...

  1. 77 FR 42462 - Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval

    Science.gov (United States)

    2012-07-19

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1952 [Docket ID. OSHA 2012-0029] RIN 1218-AC78 Hawaii State Plan for Occupational Safety and Health; Proposed Modification of 18(e) Plan Approval AGENCY: Occupational Safety and Health Administration (OSHA), Department of...

  2. 15 CFR 310.8 - Proposed plan for Federal participation.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Proposed plan for Federal participation. 310.8 Section 310.8 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) INTERNATIONAL TRADE ADMINISTRATION, DEPARTMENT OF COMMERCE MISCELLANEOUS REGULATIONS OFFICIAL U.S...

  3. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  4. Sostenibilidad, plan de desarrollo y política petrolera Sustainability, Development Plan and oil policy

    Directory of Open Access Journals (Sweden)

    Álvarez H. Carlos G.

    1999-06-01

    Full Text Available Este ensayo examina la politica petrolera y de recursos naturales del Plan de Desarrollo. Muestra, en particular, que las declaraciones de 'sostenibilidad' son inconsistentes con las politicas que se adelantan y que se trata de una propuesta de incrementos desaforados de la produccion petrolera bajo la mirada de la economia estandar. El 'desarrollo sostenible' resulta siendo tarea de las generaciones futuras, desconociendo el mandato constitucional. Tambien discute la propuesta de reforma a la ley de regalias implicita en el articulo 60 del proyecto de ley de plan de desarrollo y muestra que se emplean indicadores de competitividad manipulados para subestimar la competitividad colombiana. De acuerdo con el analisis efectuado por el Ministerio de Minas no parece razonable aprobar esa reforma si se trata de mejorar la competitividad financiera. En suma, la actual politica petrolera no introduce elementos de democracia y sostenibilidad.This essay examines the oil and natural resource policies of the Development Plan. In particular, it shows that its declarations of 'sustainability' are inconsistent with the policies it puts forward and that it is really a proposal for boundless increases in oil production under the gaze of the standard economy. 'Sustainable development' turns out to be the task of future generations, ignoring the constitutional mandate.
    It also discusses the proposal for reform of the law on payments for oil and mineral exploitation implicit in Article 60 of the Plan's law proposal and shows that the competitiveness indicators it uses are manipulated to underestimate Colombian competi tiveness. In accordance with the analysis carried out by the Ministry of Mines, it does not appear reasonable to approve this reform if the purpose is to improve financial competitiveness. In sum, the current oil policy does not introduce elements of democracy or of sustainability.

  5. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  6. 1994 Site Development Plan: A plan with vision

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The 1994 Lawrence Livermore National Laboratory Site Development Plan has been developed during a period of great change and uncertainty. Our goal is to make possible the best use of the Laboratory`s resources to meet shifting national priorities in the post-Cold War world. Site Planning is an important component of the overall Laboratory strategic planning process. This plan focuses on opportunities for the Laboratory as well as on key site development issues including facility construction, redevelopment and reuse, site accessibility, and security. A major challenge is to achieve sufficient stability in the site planning and execution so that the processes of construction can occur efficiently while at the same time providing sufficient flexibility in site facilities so that a range of changing national needs can be accommodated. We are closely coupled to the DOE strategic planning process to meet this challenge.

  7. Proposed site treatment plan (PSTP) Volumes I ampersand II ampersand reference document, Revision 3

    International Nuclear Information System (INIS)

    Helmich, E.; Noller, D.K.; Wierzbicki, K.S.

    1995-01-01

    The Federal Facility Compliance Act requires the Department of Energy to undertake a national effort to develop Site Treatment Plans for each of its sites generating or storing mixed waste. Mixed waste contains both a hazardous waste subject to the Resource Conservation and Recovery Act and radioactive material subject to the Atomic Energy Act of 1954. The Site Treatment Plan for the Savannah River Site proposes how SRS will treat mixed waste that is now stored on the site and mixed waste that Will be generated in the future. Also, the Site Treatment Plan identifies Savannah River Site mixed wastes that other Department of Energy facilities could treat and mixed waste from other facilities that the Savannah River Site could treat. The Site Treatment Plan has been approved by the State of South Carolina. The Department of Energy Will enter into a consent order with the State of South Carolina by October 6, 1995. The consent order will contain enforceable commitments to treat mixed waste

  8. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  9. Evaluating the impact a proposed family planning model would have on maternal and infant mortality in Afghanistan.

    Science.gov (United States)

    Rahmani, Ahmad Masoud; Wade, Benjamin; Riley, William

    2015-01-01

    This study aimed to assess the potential impact a proposed family planning model would have on reducing maternal and infant mortality in Afghanistan. Afghanistan has a high total fertility rate, high infant mortality rate, and high maternal mortality rate. Afghanistan also has tremendous socio-cultural barriers to and misconceptions about family planning services. We applied predictive statistical models to a proposed family planning model for Afghanistan to better understand the impact increased family planning can have on Afghanistan's maternal mortality rate and infant mortality rate. We further developed a sensitivity analysis that illustrates the number of maternal and infant deaths that can be averted over 5 years according to different increases in contraceptive prevalence rates. Incrementally increasing contraceptive prevalence rates in Afghanistan from 10% to 60% over the course of 5 years could prevent 11,653 maternal deaths and 317,084 infant deaths, a total of 328,737 maternal and infant deaths averted. Achieving goals in reducing maternal and infant mortality rates in Afghanistan requires a culturally relevant approach to family planning that will be supported by the population. The family planning model for Afghanistan presents such a solution and holds the potential to prevent hundreds of thousands of deaths. Copyright © 2013 John Wiley & Sons, Ltd.

  10. AN EDUCATIONAL DEVELOPMENT PLAN FOR THE KAPIOLANI COMMUNITY COLLEGE--JANUARY 1967.

    Science.gov (United States)

    NAKAMOTO, HARRIET; AND OTHERS

    THIS REPORT OF THE COLLEGE'S EDUCATIONAL DEVELOPMENT PLAN COMMITTEE COVERS IN DETAIL PRESENT CURRICULUMS AND FACILITIES FOR COURSES IN BUSINESS EDUCATION, DENTAL ASSISTING, HOTEL AND RESTAURANT SERVICE, LANGUAGE ARTS, AND PRACTICAL NURSING, AS WELL AS THE PROPOSED DEVELOPMENT OF PROGRAMS FOR GENERAL EDUCATION, TRANSFER, OCCUPATIONAL AND CONTINUING…

  11. Proposal plan of classification faceted for federal universities

    Directory of Open Access Journals (Sweden)

    Renata Santos Brandão

    2017-09-01

    Full Text Available This study aims to present a faceted classification plan for the archival management of documents in the federal universities of Brazil. For this, was done a literature review on the archival management in Brazil, the types of classification plans and the theory of the Ranganathan faceted classification, through searches in databases in the areas of Librarianship and Archivology. It was identified the classification plan used in the Federal Institutions of Higher Education to represent the functional facet and created the structural classification plan to represent the structural facet. The two classification plans were inserted into a digital repository management system to give rise to the faceted classification plan. The system used was Tainacan, free software wordpress-based used in digital document management. The developed faceted classification plan allows the user to choose and even combine the way to look for the information that guarantees agreater efficiency in the information retrieval.

  12. 76 FR 47154 - Proposed Information Collection; Comment Request; California Signage Plan: Evaluation of...

    Science.gov (United States)

    2011-08-04

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Proposed Information Collection; Comment Request; California Signage Plan: Evaluation of Interpretive Signs AGENCY: National... This request is for a regular submission (new collection). The California Signage Plan is an organized...

  13. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  14. 77 FR 64311 - Potential Market Impact of the Proposed Fiscal Year 2014 Annual Materials Plan; National Defense...

    Science.gov (United States)

    2012-10-19

    ... actually be associated with the two material research and development projects will depend on the market... Market Impact of the Proposed Fiscal Year 2014 Annual Materials Plan; National Defense Stockpile Market... Stockpile Market Impact Committee, co-chaired by the Departments of Commerce and State, is seeking public...

  15. Clinical trials recruitment planning: A proposed framework from the Clinical Trials Transformation Initiative.

    Science.gov (United States)

    Huang, Grant D; Bull, Jonca; Johnston McKee, Kelly; Mahon, Elizabeth; Harper, Beth; Roberts, Jamie N

    2018-03-01

    Patient recruitment is widely recognized as a key determinant of success for clinical trials. Yet a substantial number of trials fail to reach recruitment goals-a situation that has important scientific, financial, ethical, and policy implications. Further, there are important effects on stakeholders who directly contribute to the trial including investigators, sponsors, and study participants. Despite efforts over multiple decades to identify and address barriers, recruitment challenges persist. To advance a more comprehensive approach to trial recruitment, the Clinical Trials Transformation Initiative (CTTI) convened a project team to examine the challenges and to issue actionable, evidence-based recommendations for improving recruitment planning that extend beyond common study-specific strategies. We describe our multi-stakeholder effort to develop a framework that delineates three areas essential to strategic recruitment planning efforts: (1) trial design and protocol development, (2) trial feasibility and site selection, and (3) communication. Our recommendations propose an upstream approach to recruitment planning that has the potential to produce greater impact and reduce downstream barriers. Additionally, we offer tools to help facilitate adoption of the recommendations. We hope that our framework and recommendations will serve as a guide for initial efforts in clinical trial recruitment planning irrespective of disease or intervention focus, provide a common basis for discussions in this area and generate targets for further analysis and continual improvement. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.

  16. Serving our communities better. Guidelines for planning and developing integrated delivery networks.

    Science.gov (United States)

    Prybil, L; Golden, P; Ballance, X

    1995-04-01

    In 1994 the Daughters of Charity National Health System-East Central (DCNHS-East Central) adopted 11 guidelines to help corporate staff and local leaders plan and develop integrated networks. Guideline 1 emphasizes needs-based strategic planning. Guideline 2 focuses on the community-based network planning process, recommending a team approach and ongoing communication with the local ordinary. In guidelines 3 through 5, the DCNHS-East Central Board of Directors spells out key issues that must be covered in proposals ultimately presented for governance action. Guideline 6 presents three core elements that should characterize all CBNs in which DCNHS-East Central institutions participate. Guideline 7 emphasizes that all CBN proposals and agreements must be clear with respect to the Catholic identity of DCNHS-East Central institutions. Guidelines 8 and 9 require that proposed changes to traditional policies and management practices be explicit in CBN proposals. The tenth guideline requires that all CBN proposals indicate an explicit evaluation function. The final guideline underscores that regardless of the strategic fit or how well a CBN is designed, it is unlikely to succeed unless both internal and external relationships are based on a solid foundation of honesty, mutual respect, and trust.

  17. Proposal of Constraints Analysis Method Based on Network Model for Task Planning

    Science.gov (United States)

    Tomiyama, Tomoe; Sato, Tatsuhiro; Morita, Toyohisa; Sasaki, Toshiro

    Deregulation has been accelerating several activities toward reengineering business processes, such as railway through service and modal shift in logistics. Making those activities successful, business entities have to regulate new business rules or know-how (we call them ‘constraints’). According to the new constraints, they need to manage business resources such as instruments, materials, workers and so on. In this paper, we propose a constraint analysis method to define constraints for task planning of the new business processes. To visualize each constraint's influence on planning, we propose a network model which represents allocation relations between tasks and resources. The network can also represent task ordering relations and resource grouping relations. The proposed method formalizes the way of defining constraints manually as repeatedly checking the network structure and finding conflicts between constraints. Being applied to crew scheduling problems shows that the method can adequately represent and define constraints of some task planning problems with the following fundamental features, (1) specifying work pattern to some resources, (2) restricting the number of resources for some works, (3) requiring multiple resources for some works, (4) prior allocation of some resources to some works and (5) considering the workload balance between resources.

  18. Development Plan of the Sub sector Coal 1997, 2005

    International Nuclear Information System (INIS)

    1996-11-01

    This third version of the Development Plan of the Sub-sector Coal, subsequent to the editions of 1994 and 1995, it not only obeys the initial purpose of upgrading the plan annually, but to that, there being it conceived from a principle as an indicative and dynamic plan, they have happened circumstances, such as new laws and regulations, changes in the national and international market, variations in the energy politics of the country and other that force to their upgrade. The plan, although it maintains the general structure of the previous versions, fixed as planning Bureau horizon the year 2005, and it contemplates some actions to advance on the part of the State, represented by Ecocarbon. They settle down this way, strategic objectives for each one of their programs that they should be translated in the achievement of the end enunciated in the precedent paragraph. As the achievement of the auto- sustainability of the mining in the proposed term cannot be reached without the participation and the commitment of the private sector that it is the main actor in the development of the industry, the plan it includes an agreement of commitment, signed by authorized representatives guided to the achievement of the looked for objective. It is clear that, to reach the enunciated objective, a permanent evaluation of the goals, the planning bureau of the sub-sector is needed it should stay, looking for the participation of the carboniferous private sector to reach a progressive development of the mining of the coal and of the industry in general

  19. Development of a statewide motorcycle safety plan for Texas : technical report.

    Science.gov (United States)

    2013-02-01

    The objective of this research project was to develop a statewide plan to reduce motorcycle crashes and : injuries in the state of Texas. The project included a review of published literature on current and proposed : countermeasures for reducing the...

  20. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-06-01

    This Proposed Plan is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Proposed Plan is to describe the preferred remedial alternative for addressing the K-Area Bingham Pump Outage Pit (643-1G) (K BPOP) located at the Savannah River Site (SRS) in Aiken, South Carolina and to solicit public comments on the preferred alternative

  1. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  2. Management plan for the procurement of shipping casks required to service proposed federal waste repositories

    International Nuclear Information System (INIS)

    Renken, J.H.; Dupree, S.A.; Allen, G.C. Jr.; Freedman, J.M.

    1978-08-01

    Development of transportation systems to move radioactive waste and unreprocessed spent fuel to proposed federal waste repositories is an integral part of the National Waste Terminal Storage Program. To meet this requirement, shipping casks must be designed, licensed, and fabricated. To assist the manager charged with this responsibility, a Cask Procurement Plan has been formulated. This plan is presented as a logic diagram that is suitable for computer analysis. In addition to the diagram, narrative material that describes various activities in the plan is also included. A preliminary computer analysis of the logic diagram indicates that, depending on the result of several decisions which must be made during the course of the work, the latest start dates which will allow prototype delivery of all types of casks by December 1985, range from November 1977 to March 1982

  3. Accounting for uncertainty in evaluating water quality impacts of urban development plan

    International Nuclear Information System (INIS)

    Zhou Jiquan; Liu Yi; Chen Jining

    2010-01-01

    The implementation of urban development plans causes land use change, which can have significant environmental impacts. In light of this, environmental concerns should be considered sufficiently at an early stage of the planning process. However, uncertainties existing in urban development plans hamper the application of strategic environmental assessment, which is applied to evaluate the environmental impacts of policies, plans and programs. This study develops an integrated assessment method based on accounting uncertainty of environmental impacts. And the proposed method consists of four main steps: (1) designing scenarios of economic scale and industrial structure, (2) sampling for possible land use layouts, (3) evaluating each sample's environmental impact, and (4) identifying environmentally sensitive industries. In doing so, uncertainties of environmental impacts can be accounted. Then environmental risk, overall environmental pressure and potential extreme environmental impact of urban development plans can be analyzed, and environmentally sensitive factors can be identified, especially under considerations of uncertainties. It can help decision-makers enhance environmental consideration and take measures in the early stage of decision-making.

  4. Decennial development plan of the GRTgaz's transmission network 2012-2021

    International Nuclear Information System (INIS)

    2012-09-01

    The GRTgaz network is the longest high pressure natural gas transmission network in Europe, and one of the best interconnected. It comprises a main network and a regional network. After an indication of some key figures of the GRTgaz network (duct length, transported volume, exchanged power, clients, turnover, investments), this report proposes a synthetic overview of the decennial development plan framework, of European and French energy policies, of the French geographical position in relationship with Europe, and of the energetic objectives of the decennial plan. In its other parts, this report reviews the gas transmission demand and supply, analyses the evolution of the gas market in Europe and in France (consumption and supplies, issue of secure supply), describes the development of the GRTgaz transmission network (developments in the northern and southern areas, merger of North and South market areas, connection of Corsica), presents the provisional timetable for the planned works (projects put into service within 3 years or after 2014, provisional development of capacities during the 2012-2021 period)

  5. A Study on Planning Strategies for Urban Housing Block Development

    Institute of Scientific and Technical Information of China (English)

    Zeng Wei; Wang Hua; You Juanjuan; Wang Linlin; Li Caige

    2016-01-01

    As a city is the carrier of human society and housing is an important part of a citizen's life and survival,the citizens' choice of their housing mode will influence the material and spiritual life of the individuals,families,and society.In view of the diversification of values and investments,people are eager for a harmonious relationship between the community and the city.As a kind of compact and efficient housing mode,the housing block highlights the organic link of the community within the city in an open and shared living environment.This paper reviews the development of housing blocks in various countries and summarizes the characteristics of housing blocks through a comparison with traditional gated residential quarters and urban blocks.It then analyzes the current difficulties of housing block development in China from aspects such as the planning concept,planning system,management mode,and development mode and accordingly proposes planning principles and strategies in hope of providing theoretical supports for the development and construction of housing blocks in China.

  6. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  7. Bedfordshire County Structure Plan. Proposed alterations -Public participation statement. Policy 97: Nuclear waste

    International Nuclear Information System (INIS)

    1984-01-01

    The document describes steps taken, in accord with the Town and Country Planning Act 1971, by Bedfordshire County Council, submitting proposed Alterations to the County Structure Plan to the Secretary of State for the Environment. When approving the submission the Council decided to add an additional Alteration dealing with nuclear waste: as this had not been the subject of public consultation the Council decided to seek the public's views on the proposal before submitting the Alteration. The arrangements for consultation and a list of persons and organizations consulted are given, together with the arrangements for considering comments. (U.K.)

  8. Center Planning and Development: Multi-User Spaceport Initiatives

    Science.gov (United States)

    Kennedy, Christopher John

    2015-01-01

    The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any

  9. EMI Registry Development Plan

    CERN Document Server

    Memon, S.; Szigeti, G.; Field, L.

    2012-01-01

    This documents describes the overall development plan of the EMI Registry product, the plan focuses on the realisation of the EMI Registry specification as defined in the document. It is understood that during the course of the development phase the specification will likely evolve and the changes will be fed into the specification document.

  10. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  11. Preservation of information about the repository for spent nuclear fuels - proposal for action plan

    International Nuclear Information System (INIS)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina

    2008-10-01

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  12. ZONAL IMPACT ANALYSIS OF A STRATEGIC PLANNING APPROACH FOR LAND DEVELOPMENT CONTROLS

    Directory of Open Access Journals (Sweden)

    Karin LIMAPORNWANITCH

    2004-01-01

    Full Text Available Due to rapid urban developments in developing cities, the integration of land-use and transportation planning is very necessary. However, up-to-date land-use and transportation interaction planning is still difficult, because of rapid urbanization and complex relationships. The lack of human resources, budget, and necessary data are some of the hindrances. The planners in Bangkok have tried to utilize Traffic Impact Assessment (TIA in harmonizing land developments and transportation improvements, but without a complete land-use comprehensive plan, the TIA cannot effectively manage urbanization. This paper intends to propose a Zonal Impact Analysis (ZIA framework as a strategic planning tool to balance travel demands of land developments and performance of transportation systems over urban areas. First, the land-use planning situation in Bangkok is explained, afterwards the framework is described. The framework is applied into Bangkapi areas as a case study. Both single and simultaneous development cases are considered. It was found that more comprehensive development alternatives were established. The most suitable zone for a single project is Zone 179, as the advantages of location in the center of radial networks, so full accessibility can be provided. Without any network improvements in Zone 179, the simultaneous developments should be implemented in Zone 168 and 173, as high capacities of the expressway are available. The results give a better understanding on the characteristics of land-use and transportation planning in Bangkapi. Finally, it was emphasized that the ZIA framework is a strategic planning alternative to increase the capabilities of growth management for sustainable developments.

  13. Stakeholder insights on the planning and development of an independent benchmark standard for responsible food marketing.

    Science.gov (United States)

    Cairns, Georgina; Macdonald, Laura

    2016-06-01

    A mixed methods qualitative survey investigated stakeholder responses to the proposal to develop an independently defined, audited and certifiable set of benchmark standards for responsible food marketing. Its purpose was to inform the policy planning and development process. A majority of respondents were supportive of the proposal. A majority also viewed the engagement and collaboration of a broad base of stakeholders in its planning and development as potentially beneficial. Positive responses were associated with views that policy controls can and should be extended to include all form of marketing, that obesity and non-communicable diseases prevention and control was a shared responsibility and an urgent policy priority and prior experience of independent standardisation as a policy lever for good practice. Strong policy leadership, demonstrable utilisation of the evidence base in its development and deployment and a conceptually clear communications plan were identified as priority targets for future policy planning. Future research priorities include generating more evidence on the feasibility of developing an effective community of practice and theory of change, the strengths and limitations of these and developing an evidence-based step-wise communications strategy. Copyright © 2016 Elsevier Ltd. All rights reserved.

  14. National Energy Audit Tool for Multifamily Buildings Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; MacDonald, Michael [Sentech, Inc.; Accawi, Gina K [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2012-03-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP) enables low-income families to reduce their energy costs by providing funds to make their homes more energy efficient. In addition, the program funds Weatherization Training and Technical Assistance (T and TA) activities to support a range of program operations. These activities include measuring and documenting performance, monitoring programs, promoting advanced techniques and collaborations to further improve program effectiveness, and training, including developing tools and information resources. The T and TA plan outlines the tasks, activities, and milestones to support the weatherization network with the program implementation ramp up efforts. Weatherization of multifamily buildings has been recognized as an effective way to ramp up weatherization efforts. To support this effort, the 2009 National Weatherization T and TA plan includes the task of expanding the functionality of the Weatherization Assistant, a DOE-sponsored family of energy audit computer programs, to perform audits for large and small multifamily buildings This report describes the planning effort for a new multifamily energy audit tool for DOE's WAP. The functionality of the Weatherization Assistant is being expanded to also perform energy audits of small multifamily and large multifamily buildings. The process covers an assessment of needs that includes input from national experts during two national Web conferences. The assessment of needs is then translated into capability and performance descriptions for the proposed new multifamily energy audit, with some description of what might or should be provided in the new tool. The assessment of needs is combined with our best judgment to lay out a strategy for development of the multifamily tool that proceeds in stages, with features of an initial tool (version 1) and a more capable version 2 handled with currently available resources. Additional

  15. Plutonium Focus Area research and development plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects.

  16. Plutonium Focus Area research and development plan. Revision 1

    International Nuclear Information System (INIS)

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects

  17. 75 FR 2161 - Proposed Extension of Information Collection; Comment Request; Employee Benefit Plan Claims...

    Science.gov (United States)

    2010-01-14

    ... DEPARTMENT OF LABOR Employee Benefits Security Administration Proposed Extension of Information Collection; Comment Request; Employee Benefit Plan Claims Procedures Under ERISA AGENCY: Employee Benefits... Employee Benefits Security Administration (EBSA) is soliciting comments on a proposed extension of the...

  18. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  19. Proposed standby gasoline rationing plan: public comments

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    Under the proposed plan, DOE would allocate ration rights (rights to purchase gasoline) to owners of registered vehicles. All vehicles in a given class would receive the same entitlement. Essential services would receive supplemental allotments of ration rights as pririty firms. Once every 3 months, ration checks would be mailed out to all vehicle registrants, allotting them a certain amount of ration rights. These checks would then be cashed at Coupon Issuance Points, where the bearer would receive ration coupons to be used at gasoline stations. Large users of gasoline could deposit their allotment checks in accounts at ration banks. Coupons or checks would be freely exchangeable in a white market. A certain percentage of the gasoline supply would be set aside in reserve for use in national emergencies. When the plan was published in the Federal Register, public comments were requested. DOE also solicited comments from private citizens, public interest groups, business and industry, state and local governments. A total of 1126 responses were reveived and these are analyzed in this paper. The second part of the report describes how the comments were classified, and gives a statistical breakdown of the major responses. The last section is a discussion and analysis of theissue raised by commenting agencies, firms, associations, and individuals. (MCW)

  20. Strategic Planning for New Presidents: Developing an Entrance Plan

    Science.gov (United States)

    Garza Mitchell, Regina L.; Maldonado, Cesar

    2015-01-01

    Community colleges are greatly impacted by turbulent external forces while also experiencing turnover in the topmost leadership positions. New presidents must learn how to lead an institution while also planning for purposeful change that will allow the college to thrive. In this article, the authors propose a method for new presidents to develop…

  1. 78 FR 17224 - Environmental Impact Statement; Proposed South Puget Sound Prairie Habitat Conservation Plan...

    Science.gov (United States)

    2013-03-20

    ... sizable portion of South Puget Sound Prairie habitat is located in the urban-rural interface and in the...-FF01E00000] Environmental Impact Statement; Proposed South Puget Sound Prairie Habitat Conservation Plan... permit application would be associated the South Puget Sound Prairie Habitat Conservation Plan (Prairie...

  2. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  3. Overview of energy-conserving development planning and design techniques based on five case studies

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    Findings and recommendations are presented of a review of five case studies of ways to conserve energy through development planning and site design in communities. Two approaches were used. In the first approach, a conventional, pre-existing plan was analyzed to determine potential energy use. Once energy-conservation options were identified and evaluated, the conventional plan was modified by employing those options. This approach was used in The Woodlands, Burke Center, and Radisson studies. In the second approach, energy-conservation options are independently identified and evaluated. Those options that passed specific criteria screening were then utilized in developing one or more totally new plans based on energy objectives. This approach was used in Greenbrier and Shenandoah. Radisson is a new town on the outskirts of Syracuse, New York. Greenbrier is a 3000 acre planned community adjacent to Norfolk and Virginia Beach. Shenandoah is a proposed new town in the Atlanta urbanized area. The Woodlands is a new community under development north of Houston. Burke Center is a residential planned unit development in Fairfax County, Virgnia. (MCW)

  4. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  5. Developing an interdisciplinary certificate program in transportation planning, phase 2 : the eCertificate.

    Science.gov (United States)

    2011-11-01

    This proposal extends the delivery of the recently developed graduate Certificate in Transportation : Planning to a wider audience through the establishment of an Executive Certificate Program by distance : (eCertificate). While the need for an inter...

  6. Development of an End-to-End Active Debris Removal (ADR) Mission Strategic Plan

    Data.gov (United States)

    National Aeronautics and Space Administration — The original proposal was to develop an ADR mission strategic plan. However, the task was picked up by the OCT. Subsequently the award was de-scoped to $30K to...

  7. Organisational development in general practice: lessons from practice and professional development plans (PPDPs

    Directory of Open Access Journals (Sweden)

    Hocking Paul

    2000-12-01

    introducing expert external facilitation were clear: evaluations of internal group processes were possible, strategic issues could be raised and explored and financial probity ensured. These areas are much more difficult to examine when only internal stakeholders are engaged in a planning process. Conclusions It is not possible to introduce practice and professional development plans (organisational development and organisational learning projects in a publicly funded health care system without first addressing existing educational and management structures. Existing systems are based on educational credits for attendance and emerging accountability frameworks (criteria checklists for clinical governance. Moving to systems that are less summative and more formative, and based on the philosophies of continual quality improvement, require changes to be made in the relevant support systems in order achieve policy proposals.

  8. Momentum: "Developing Masterful Marketing Plans."

    Science.gov (United States)

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  9. Fact Sheet: Supplemental Proposal: State Plans to Address Emissions during Startup, Shutdown and Malfunction (SSM)

    Science.gov (United States)

    On September 5, 2014, EPA proposed a rule supplementing and revising its February 2013 proposal to ensure states have plans in place that require industrial facilities across the country to follow air pollution rules during SSM operations.

  10. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada: Volume 1

    International Nuclear Information System (INIS)

    1987-08-01

    Environmental protection during the course of siting and constructing a repository is mandated by NWPA in conjunction with various phases of repository siting and development. However, DOE has issued no comprehensive, integrated plan for environmental protection. Consequently, it is unclear how DOE will accomplish environmental assessment, monitoring, impact mitigation, and site reclamation. DOE should, therefore, defer further implementation of its current characterization program until a comprehensive environmental protection plan is available. To fulfill its oversight responsibilities the State of Nevada has proposed a comprehensive environmental program for the Yucca Mountain site that includes immediately undertaking studies to establish a 12-month baseline of environmental information at the site; adopting the DOE Site Characterization Plan (SCP) and the engineering design plans it will contain as the basis for defining the impact potential of site characterization activities; using the environmental baseline and the SCP to evaluate the efficacy of the preliminary impact analyses reported by DOE in the EA; using the SCP as the basis for discussions with federal, state, and local regulatory authorities to decide which environmental requirements apply and how they can be complied with; using the SCP, the EA impact review, and the compliance requirements to determine the scope of reclamation measures needed; and developing environmental monitoring and impact mitigation plans based on the EA impact review, compliance requirements, and anticipated reclamation needs

  11. Some consideration on nuclear power development. Topics aroused by U.S. proposed 'Generation IV Nuclear Power System

    International Nuclear Information System (INIS)

    Wang Chuanying; Chen Shiqi

    2001-01-01

    U.S. proposed 'Generation IV Nuclear Power System' concept. Its origin and proposed goals for it are analyzed; goals are compared with requirements of URD. In particular, discussed issues on nuclear fuel cycle and Non-proliferation. A well-considered nuclear power development plan, paying close attention to international trend and considering comprehensively domestic situation, is expected

  12. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  13. Planning: Management of predictability and uncertainty and keeping abreast of developments

    Science.gov (United States)

    Bastien-Thiry, Christophe; Verfaillie, Gerard

    1993-01-01

    The purpose of this study is to propose method to set up and control of a space mission plan such as that of the HERMES spaceplane. The interest of this subject, other than its complexity, is due to the need to manage imprecision and uncertainty during a mission, as well as changes in between missions. Under these conditions, the set up and control of a flight plan require certain special attention and this has led us to define a certain number of qualities: mastery of complexity in order to resolve conflicts between activities: configuration, resource and time management; consideration of various criteria such as risk minimization or the attainment of mission objectives; robustness and flexibility to allow for hazards and deviations from the norm during operation without having to draw up new plans; aptness for replanning by making changes to the plan without having to set up the whole plan again; and memorization and explanation facility in order to manage developments between missions.

  14. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Powell, H.T.; Kilkenny, J.D. [eds.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program.

  15. Core science and technology development plan for indirect-drive ICF ignition. Revision 1

    International Nuclear Information System (INIS)

    Powell, H.T.; Kilkenny, J.D.

    1995-12-01

    To define the development work needed to support inertial confinement fusion (ICF) program goals, the authors have assembled this Core Science and Technology (CS and T) Plan that encompasses nearly all science research and technology development in the ICF program. The objective of the CS and T Plan described here is to identify the development work needed to ensure the success of advanced ICF facilities, in particular the National Ignition Facility (NIF). This plan is intended as a framework to facilitate planning and coordination of future ICF programmatic activities. The CS and T Plan covers all elements of the ICF program including laser technology, optic manufacturing, target chamber, target diagnostics, target design and theory, target components and fabrication, and target physics experiments. The CS and T Plan has been divided into these seven different technology development areas, and they are used as level-1 categories in a work breakdown structure (WBS) to facilitate the organization of all activities in this plan. The scope of the CS and T Plan includes all research and development required to support the NIF leading up to the activation and initial operation as an indirect-drive facility. In each of the CS and T main development areas, the authors describe the technology and issues that need to be addressed to achieve NIF performance goals. To resolve all issues and achieve objectives, an extensive assortment of tasks must be performed in a coordinated and timely manner. The authors describe these activities and present planning schedules that detail the flow of work to be performed over a 10-year period corresponding to estimated time needed to demonstrate fusion ignition with the NIF. Besides the benefits to the ICF program, the authors also discuss how the commercial sector and the nuclear weapons science may profit from the proposed research and development program

  16. Analysis of Development Plans from Communications Perspective

    Directory of Open Access Journals (Sweden)

    Zohreh Shahghasemi

    2016-12-01

    Full Text Available The movement towards the goals of "Vision plan 1404" needs the perception of the requirements to prepare plans for achieving the favorite objectives of development. With the advent of the information age, the rules of development policy-making strongly have changed in the world and also unique opportunities areprovided by variables of communications for countries that have been in early stages of development. Based on this, considering the communications in macro-level and in the political, social, economic and cultural development plans is important and necessary. This requires a review and pathology of previous plans and evaluation of their strengths and weaknesses for preparing of more comprehensive future plans. Themain question of this study is: what is the approach of development plans to communications section after Islamic revolution?  Which aspects of communications are considered, and what aspects are ignored?  This study analyzes five development plans after the revolution, by using of qualitative content analysis. Results show that in all five-year plans the focus was on hardware and quantitative dimensions of communication development and media, but qualitative and content aspects, such as the right to universal access to information, freedom to obtain and disseminate information within the constitution, freedom of speech and press, a move towards the information society and knowledge-based, also other dimensions of communications such as human, traditional and social communication has been less considered. In the fourth development plan that is "knowledge" – centered, new fields of communications has been studied comprehensively in comparison to other plans. According to these approaches and new scientific and experimental perspectives, this paper suggests further engagement in communications necessity for development policy-making.

  17. ORGANIZATION AND PLANNING IN CHILDREN WITH ADHD: EVALUATION AND PROPOSAL OF A STIMULATION PROGRAM

    Directory of Open Access Journals (Sweden)

    Josefina Rubiales

    2011-12-01

    Full Text Available The Attention Deficit Hyperactivity Disorder (ADHD is a neurobiological disorder of a complex and heterogeneous origin characterized by a persistent pattern of inattention, hyperactivity and / or impulsivity. Is one of the most common neurobehavioral disorders in childhood and adolescence, and one of the main reasons for consultation because of difficulties in school performance, behavior problems, difficulties of living at home and with peers, involvement in self-esteem and aggressiveness. The primary deficit is associated with executive dysfunction, among which is the organization and planning. The aim of this study was to compare the performance in organization and planning of children with and without a diagnosis of ADHD and submit a stimulation proposal according to their needs. MATERIALS AND METHODS: The clinical sample comprised 16 children diagnosed with ADHD and the control sample of 32 children without a diagnosis, in both cases 8 to 14 years old and from the city of Mar del Plata (Argentina. The instruments used to evaluate the organization and planning has been the subtest Torres of Mexico Child Neuropsychological Battery (ENI, and cubes subtests Construction, Completion and Management Object Test Story Weschler Intelligence for children and adolescents. The proposed treatment includes 8 sessions of stimulation. RESULTS AND CONCLUSIONS: Children with ADHD have greater difficulty in planning and organizational skills than the children of the control sample, from which it establishes a estimulation proposal, whose originality and advantage is accentuated in the ecological validity the process.

  18. Planning of development strategy for establishment of advanced simulation of nuclear system

    International Nuclear Information System (INIS)

    Chung, Bubdong; Ko, Wonil; Kwon Junhyun

    2013-12-01

    In this product, the long term development plan in each technical area has been prosed with the plan of coupled code system. The consolidated code system for safety analysis has been proposing for future needs. The computing hardware needed for te advanced simulation is also proposing. The best approach for future safety analysis simulation capabilities may be a dual-path program. i. e. the development programs for an integrated analysis tool and multi-scale/multi-physic analysis tools, where the former aims at reducing uncertainty and the latter at enhancing accuracy. Integrated analysis tool with risk informed safety margin quantification It requires a significant extension of the phenomenological and geometric capabilities of existing reactor safety analysis software, capable of detailed simulations that reduce the uncertainties. Multi-scale, multi-physics analysis tools. Simplifications of complex phenomenological models and dependencies have been made in current safety analyses to accommodate computer hardware limitations. With the advent of modern computer hardware, these limitations may be removed to permit greater accuracy in representation of physical behavior of materials in design basis and beyond design basis conditions, and hence more accurate assessment of the true safety margins based on first principle methodology. The proposals can be utilized to develop the advanced simulation project and formulation of organization and establishment of high performance computing system in KAERI

  19. Developing a business plan for a startup e-business

    OpenAIRE

    Vu, Khanh

    2013-01-01

    The purpose of this thesis is to develop an initial business plan for a startup fashion company that operates on the Internet in the Vietnamese market. To reach the target objective, the thesis first examines e-business from a theoretical perspective and considers its advantages and disadvantages. Secondly, the macro environment of the proposed business is analyzed, namely the country of Vietnam and its e-commerce environment. Finally, the outcome of the thesis is presented in the form of a b...

  20. Niger Republic mineral planning (part five): recommendations and suggestions for the developement of mineral resources

    International Nuclear Information System (INIS)

    Franconi, A.

    1986-06-01

    The mineral planning present a comprehensive program of prospecting in order to increase mineral industry sector participation to the economc development of the country. Subjects taken in consideration in this volume are: setting up structural and technical means; projects proposal; summary of projects, financial cost estimation and proposals for activities forward looking calendar [fr

  1. 78 FR 38070 - 30-Day Notice of Proposed Information Collection: Affirmative Fair Housing Marketing (AFHM) Plan

    Science.gov (United States)

    2013-06-25

    ... Information Collection: Affirmative Fair Housing Marketing (AFHM) Plan AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed information collection requirement... Title of Information Collection: Affirmative Fair Housing Marketing (AFHM) Plan. OMB Approval Number...

  2. Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China

    International Nuclear Information System (INIS)

    Song Guojun; Zhou Li; Zhang Lei

    2011-01-01

    The National Economic and Social Development Plans (NESDPs) of cities in China, given their comprehensive, integrated and strategic nature, have significant and profound impacts on the development of cities and their embedded ecological environments. Strategic Environmental Assessments (SEAs) on city NESDPs have the potential to improve environmental policy integration at strategic level and to safeguard the sustainable development of cities. However, these plans are normally exempted from the current SEA requirement in China. We argue that it is more feasible to apply SEAs on city NESDPs before SEAs are expanded to higher level NESDPs in China. This article attempts to propose a China-specific institutional design for SEAs on city NESDPs based on experiments in selected cities and within the current legal framework. To obtain a holistic view about the long-term development of cities, more qualitative and descriptive analysis-based assessment methods should be adopted to broaden participation, to encourage the exchange of information and to reach consensus. - Highlights: → National Economic and Social Development Plans for Cities (NESDPs) in China is a very popular and significant decision made by municipal government. → We propose a institutional framework to conduct strategic environmental assessment to NESDPs. → The key features of the institutional framework are the independent SEA approval committee and a professional consulting agency.

  3. A new approach to nationwide sanitation planning for developing countries: Case study of Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Kerstens, S.M., E-mail: sjoerd.kerstens@rhdhv.com [Royal HaskoningDHV, P.O. Box 1132, 3800 BC, Amersfoort (Netherlands); Spiller, M., E-mail: marc.spiller@wur.nl [Wageningen University, Sub-department of Environmental Technology, P.O. Box 8129, 6700 EV Wageningen (Netherlands); Leusbrock, I., E-mail: ingo.leusbrock@wur.nl [Wageningen University, Sub-department of Environmental Technology, P.O. Box 8129, 6700 EV Wageningen (Netherlands); Zeeman, G., E-mail: grietje.zeeman@wur.nl [Wageningen University, Sub-department of Environmental Technology, P.O. Box 8129, 6700 EV Wageningen (Netherlands)

    2016-04-15

    Many developing countries struggle to provide wastewater and solid waste services. The backlog in access has been partly attributed to the absence of a functional sanitation planning framework. Various planning tools are available; however a comprehensive framework that directly links a government policy to nationwide planning is missing. Therefore, we propose a framework to facilitate the nationwide planning process for the implementation of wastewater and solid waste services. The framework requires inputs from government planners and experts in the formulation of starting points and targets. Based on a limited number of indicators (population density, urban functions) three outputs are generated. The first output is a visualization of the spatial distribution of wastewater and solid waste systems to support regional priority setting in planning and create awareness. Secondly, the total number of people served, budget requirements and distribution of systems is determined. Thirdly, the required budget is allocated to the responsible institution to assure effective implementation. The determined budgets are specified by their beneficiaries, distinguishing urban, rural, poor and non-poor households. The framework was applied for Indonesia and outputs were adopted in the National Development Plan. The required budget to reach the Indonesian government's 2019 target was determined to be 25 billion US$ over 5 years. The contribution from the national budget required a more than fivefold increase compared to the current budget allocation in Indonesia, corresponding to an increase from 0.5 to 2.7 billion US$ per year. The budget for campaigning, advocacy and institutional strengthening to enable implementation was determined to be 10% of the total budget. The proposed framework is not only suitable for Indonesia, but could also be applied to any developing country that aims to increase access to wastewater and solid waste facilities. - Highlights: • A nationwide

  4. A new approach to nationwide sanitation planning for developing countries: Case study of Indonesia

    International Nuclear Information System (INIS)

    Kerstens, S.M.; Spiller, M.; Leusbrock, I.; Zeeman, G.

    2016-01-01

    Many developing countries struggle to provide wastewater and solid waste services. The backlog in access has been partly attributed to the absence of a functional sanitation planning framework. Various planning tools are available; however a comprehensive framework that directly links a government policy to nationwide planning is missing. Therefore, we propose a framework to facilitate the nationwide planning process for the implementation of wastewater and solid waste services. The framework requires inputs from government planners and experts in the formulation of starting points and targets. Based on a limited number of indicators (population density, urban functions) three outputs are generated. The first output is a visualization of the spatial distribution of wastewater and solid waste systems to support regional priority setting in planning and create awareness. Secondly, the total number of people served, budget requirements and distribution of systems is determined. Thirdly, the required budget is allocated to the responsible institution to assure effective implementation. The determined budgets are specified by their beneficiaries, distinguishing urban, rural, poor and non-poor households. The framework was applied for Indonesia and outputs were adopted in the National Development Plan. The required budget to reach the Indonesian government's 2019 target was determined to be 25 billion US$ over 5 years. The contribution from the national budget required a more than fivefold increase compared to the current budget allocation in Indonesia, corresponding to an increase from 0.5 to 2.7 billion US$ per year. The budget for campaigning, advocacy and institutional strengthening to enable implementation was determined to be 10% of the total budget. The proposed framework is not only suitable for Indonesia, but could also be applied to any developing country that aims to increase access to wastewater and solid waste facilities. - Highlights: • A nationwide

  5. 78 FR 4505 - Options Price Reporting Authority; Notice of Filing of Proposed Amendment to the Plan for...

    Science.gov (United States)

    2013-01-22

    ... Options Last Sale Reports and Quotation Information To Amend Section 3.5 of the OPRA Plan January 15, 2013... of Consolidated Options Last Sale Reports and Quotation Information (``OPRA Plan'').\\3\\ The proposed....opradata.com . The OPRA Plan provides for the collection and dissemination of last sale and quotation...

  6. Consistency and Reconciliation Model In Regional Development Planning

    Directory of Open Access Journals (Sweden)

    Dina Suryawati

    2016-10-01

    Full Text Available The aim of this study was to identify the problems and determine the conceptual model of regional development planning. Regional development planning is a systemic, complex and unstructured process. Therefore, this study used soft systems methodology to outline unstructured issues with a structured approach. The conceptual models that were successfully constructed in this study are a model of consistency and a model of reconciliation. Regional development planning is a process that is well-integrated with central planning and inter-regional planning documents. Integration and consistency of regional planning documents are very important in order to achieve the development goals that have been set. On the other hand, the process of development planning in the region involves technocratic system, that is, both top-down and bottom-up system of participation. Both must be balanced, do not overlap and do not dominate each other. regional, development, planning, consistency, reconciliation

  7. FACTORS AFFECTING FINANCIAL CONSUMERS’ PRIVATE PENSION PLAN DECISIONS: A LITERATURE REVIEW AND A CONCEPTUAL FRAMEWORK PROPOSAL

    Directory of Open Access Journals (Sweden)

    Aslı Elif Aydın

    2016-08-01

    Full Text Available The objective of this study is to propose a framework related to financial consumers’ private pension plan decisions. Specifically, we review the factors affecting consumers’ participation, contribution and asset allocation decisions regarding private pensions. The factors discussed include situational and dispositional factors, personality, motivation, financial literacy, and external influences. Based on this survey of literature, we develop a number of propositions, which are expected to benefit individual retirement planners and pension institutions in gaining a better understanding of retirement saving decisions.

  8. Spatial and sectoral planning support to sustainable territorial and tourism development of protected mountain areas in Serbia

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2014-01-01

    Full Text Available The starting point for easier resolution of conflicts between conservation and development should be the application of the concept of protected areas of natural heritage as social-ecological systems. This is also the precondition for attainment of strategic planning coordination for protected mountain areas (PMA. The objective of the paper is to provide the insight into the effectiveness of strategic planning support - spatial and sectoral planning - to sustainable territorial and tourism development of PMA in Serbia. The study area comprises Kopaonik and Đerdap National Parks, and Stara Planina Nature Park. This paper evaluates the effectiveness of strategic planning for PMA by means of analysis and evaluation of spatial plans, Strategic Environmental Assessment (SEA and sector plans in tourism for the study area. The effectiveness of spatial planning is checked based on the analysis and evaluation of sustainability of zoning and land-use regimes, and of tourism development proposed by spatial plans for the study area. The conclusion is that it is necessary to apply holistic approach to sector planning for nature conservation and tourism development, and to apply SEA for tourism planning as well. Reduction of the spatial coverage of PMA and spatial differentiation of protected zones from the ones planned for intensive development is recommended.

  9. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  10. 77 FR 23747 - Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

    Science.gov (United States)

    2012-04-20

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the John Day Basin planning area and by... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLORP0000.16100000.DQ0000 LXSS053H0000 HAG10-0234] Notice of Availability of the Proposed John Day Basin Resource Management Plan and Final...

  11. Neutral-beam development plan, FY 1982-1987

    International Nuclear Information System (INIS)

    1981-09-01

    The following chapters are included: (1) status of BNL negative ion source development, (2) source development program plan, (3) status of beam transport and acceleration, (4) accelerator development program plan, (5) neutralizer concepts, (6) neutralization program plan, (7) neutral beam systems, (8) test facilities, (9) program milestones and time schedules, (10) organization and Grumman participation, and (11) funding tables

  12. 78 FR 34973 - Proposal for Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana

    Science.gov (United States)

    2013-06-11

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9820-9] Proposal for Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY... direct final rulemaking, Indiana's State Plan to control air pollutants from Sewage Sludge Incinerators...

  13. A multi-objective approach for developing national energy efficiency plans

    International Nuclear Information System (INIS)

    Haydt, Gustavo; Leal, Vítor; Dias, Luís

    2014-01-01

    This paper proposes a new approach to deal with the problem of building national energy efficiency (EE) plans, considering multiple objectives instead of only energy savings. The objectives considered are minimizing the influence of energy use on climate change, minimizing the financial risk from the investment, maximizing the security of energy supply, minimizing investment costs, minimizing the impacts of building new power plants and transmission infrastructures, and maximizing the local air quality. These were identified through literature review and interaction with real decision makers. A database of measures is established, from which millions of potential EE plans can be built by combining measures and their respective degree of implementation. Finally, a hybrid multi-objective and multi-criteria decision analysis (MCDA) model is proposed to search and select the EE plans that best match the decision makers’ preferences. An illustration of the working mode and the type of results obtained from this novel hybrid model is provided through an application to Portugal. For each of five decision perspectives a wide range of potential best plans were identified. These wide ranges show the relevance of introducing multi-objective analysis in a comprehensive search space as a tool to inform decisions about national EE plans. - Highlights: • A multiple objective approach to aid the choice of national energy efficiency plans. • A hybrid multi-objective MCDA model is proposed to search among the possible plans. • The model identified relevant plans according to five different idealized DMs. • The approach is tested with Portugal

  14. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  15. Development of a master plan for industrial solid waste management

    International Nuclear Information System (INIS)

    Karamouz, M.; Zahraie, B.; Kerachian, R.; Mahjouri, N.; Moridi, A.

    2006-01-01

    Rapid industrial growth in the province of Khuzestan in the south west of Iran has resulted in disposal of about 1750 tons of solid waste per day. Most of these industrial solid wastes including hazardous wastes are disposed without considering environmental issues. This has contributed considerably to the pollution of the environment. This paper introduces a framework in which to develop a master plan for industrial solid waste management. There are usually different criteria for evaluating the existing solid waste pollution loads and how effective the management schemes are. A multiple criteria decision making technique, namely Analytical Hierarchy Process, is used for ranking the industrial units based on their share in solid waste related environmental pollution and determining the share of each unit in total solid waste pollution load. In this framework, a comprehensive set of direct, indirect, and supporting projects are proposed for solid waste pollution control. The proposed framework is applied for industrial solid waste management in the province of Khuzestan in Iran and a databank including GIS based maps of the study area is also developed. The results have shown that the industries located near the capital city of the province, Ahwaz, produce more than 32 percent of the total solid waste pollution load of the province. Application of the methodology also has shown that it can be effectively used for development of the master plan and management of industrial solid wastes

  16. Integrating ecosystem services and climate change responses in coastal wetlands development plans for Bangladesh

    NARCIS (Netherlands)

    Sarwar, M.H.; Hein, L.G.; Rip, F.I.; Dearing, J.A.

    2015-01-01

    This study explores the integration of ecosystem services and climate change adaptation in development plans for coastal wetlands in Bangladesh. A new response framework for adaptation is proposed, based on an empirical analysis and consultations with stakeholders, using a modified version of the

  17. Health, Well-Being and Coping Mechanism of BPO Shift Workers: Basis of a Proposed Development Plan

    Directory of Open Access Journals (Sweden)

    MADELYN ROUSELLE A. CRUZAT

    2014-04-01

    Full Text Available There are many studies with regard to problems caused by shift work, thus, shift workers are recently thinking about how to solve and implement behaviors that will reduce the problems caused by their work. The present study sought to determine the effects of shift work in a Business Process Outsourcing company in terms of shift workers health, Psychological well – being and their coping mechanisms and provide an Action Plan for training and development. A total number of 210 respondents who were administered Shift Work Index Questionnaire and were tabulated and analyzed using Factor Analysis, ANOVA and Post Hoc Analysis in Sheffe method. The overall results of the study showed that the level of coping mechanisms such as social, domestic, sleep routine and work performance suggests significant difference with the three groups of shift workers, thus, the hypothesis is rejected. However, health and well – being do not show significant difference as to the response of the three groups of shift workers, hence the hypothesis was supported. In lieu with other researches, it was determined that shift workers have their own coping strategies to deal with their problem and when it results to successful coping, it leads to restoration of physical and psychological well – being. When the coping skills are not adequate the stress may lead to negative physical and psychological well – being. The implications of Action Plan is that BPO Companies may develop and enhance trainings and development seminars and programs which involves Physical health activities, Psychological health programs and Coping Mechanism strategies to limit the problems encountered by shift workers.

  18. Forward-Looking Planning of Technology Development

    Directory of Open Access Journals (Sweden)

    Katarzyna Halicka

    2015-12-01

    Full Text Available The main aim of this article is to adapt the Future-Oriented Technology Analysis (FTA to prospective planning of technology development. Firstly, the article presents the assumptions, methods and idea, as well as the concept of the FTA method. Moreover, selected publications on the use of this method were analysed. Then, an original, base model of forward-looking planning of technology development was constructed and presented. The end result of this process will be the development of the localized in time, presented in graphic form, action plan referred to as the route of technology development. Basing on the literature review and the research projects a preliminary route of development of arbitrarily chosen technology was also built and presented.

  19. Online marketing plan proposal : Promotion of Microfinance Software Application to Nigeria

    OpenAIRE

    Boldosova, Valeriia

    2012-01-01

    Every company faces a time when there is a need to develop a marketing plan, which consists of determined goals and objectives, analysis of current situation, forecast planning and other relevant elements. In order to stay competitive and gain competitive advantage, companies seek for other marketing opportunities aside from traditional marketing. The era of technology has facilitated internet marketing development and opened the door of marketing opportunities. The main objective of this...

  20. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  1. 78 FR 13379 - Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations

    Science.gov (United States)

    2013-02-27

    ...] Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations AGENCY: National...) unpatented placer claims within Wrangell-St. Elias National Park and Preserve. Public Availability: This plan...: Wrangell-St. Elias National Park and Preserve Headquarters, Mile 106.8 Richardson Highway, Post Office Box...

  2. Wanted: A World Development Plan

    NARCIS (Netherlands)

    J. Tinbergen (Jan)

    1968-01-01

    textabstractDevelopment planning has become a routine activity for large numbers of corporations as well as for public authorities at various levels, particularly national governments. In quite a few national planning agencies extensive analyses of the probable expansion of world supply and demand

  3. Long term planning for wind energy development

    International Nuclear Information System (INIS)

    Trinick, M.

    1995-01-01

    In a planning system intended to be governed primarily by policies in statutory plans a reasonable horizon for long term planning is 10 years or longer. Because of statutory requirements, developers have no option but to pay due regard to, and take a full part in, long term planning. The paper examines the type of policies which have emerged in the last few years to cater for wind energy development. It canvasses the merits of different types of policies. Finally, it discusses the policy framework which may emerge to cater for development outside NFFO. (Author)

  4. Energetic models: a proposal of integrated planning; Modelos energeticos: uma proposta de planejamento integrado

    Energy Technology Data Exchange (ETDEWEB)

    Pereira Junior, Amaro Olimpio; Soares, Jeferson Borghetti; Araujo, Mauro Almeida [Empresa de Pesquisa Energetica (EPE), Brasilia, DF (Brazil)]. E-mails: amaro.pereira@epe.gov.br; jeferson.soares@epe.gov.br; mauro.almeida@epe.gov.br; La Rovere, Emilio Lebre [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia. Programa de Planejamento Estrategico]. E-mail: emilio@ppe.ufrj.br; Costa, Ricardo Cunha da [Banco Nacional de Desenvolvimento Economico e Social (BNDES), Rio de Janeiro, RJ (Brazil)]. E-mail: rcco@bndes.gov.br

    2006-07-01

    Top-down, bottom-up and hybrid models for representing energy system are often used in energy planning. However, in developing countries some of their assumptions do not apply: markets are not developed and not competitive; informal economies are representative; there are huge social inequalities; regulatory changes are not completed; there exist constraints to capital flow; etc. All theses problems need to be well represented in order to have energy analysis more consistent. In this work, it is proposed a multi-sector dynamic recursive model that incorporates consumer behaviors, energy policies, technical progress and factors of production substitution. The static result feeds detailed energy models that provide updated values for the next step equilibrium. This approach takes advantages not only in terms of computation but also in terms of the consistence between economy and energy modeling. (author)

  5. A Proposal to Develop Interactive Classification Technology

    Science.gov (United States)

    deBessonet, Cary

    1998-01-01

    Research for the first year was oriented towards: 1) the design of an interactive classification tool (ICT); and 2) the development of an appropriate theory of inference for use in ICT technology. The general objective was to develop a theory of classification that could accommodate a diverse array of objects, including events and their constituent objects. Throughout this report, the term "object" is to be interpreted in a broad sense to cover any kind of object, including living beings, non-living physical things, events, even ideas and concepts. The idea was to produce a theory that could serve as the uniting fabric of a base technology capable of being implemented in a variety of automated systems. The decision was made to employ two technologies under development by the principal investigator, namely, SMS (Symbolic Manipulation System) and SL (Symbolic Language) [see debessonet, 1991, for detailed descriptions of SMS and SL]. The plan was to enhance and modify these technologies for use in an ICT environment. As a means of giving focus and direction to the proposed research, the investigators decided to design an interactive, classificatory tool for use in building accessible knowledge bases for selected domains. Accordingly, the proposed research was divisible into tasks that included: 1) the design of technology for classifying domain objects and for building knowledge bases from the results automatically; 2) the development of a scheme of inference capable of drawing upon previously processed classificatory schemes and knowledge bases; and 3) the design of a query/ search module for accessing the knowledge bases built by the inclusive system. The interactive tool for classifying domain objects was to be designed initially for textual corpora with a view to having the technology eventually be used in robots to build sentential knowledge bases that would be supported by inference engines specially designed for the natural or man-made environments in which the

  6. Issues in regional planning and development in Nigeria

    Directory of Open Access Journals (Sweden)

    Oladayo Ramon Ibrahim

    2017-10-01

    Full Text Available Till date,Nigeria can not boast of a specific, well-formulated, clear regional development policy framework despite several urban planning, development and governance initiatives including passage of regulations at both federal and state government levels that have been undertaken since independence by successive post- colonial governments. Most of the country's claims of regional development are products of other policies, and intentions, which do not have any bearing on, deliberate regional planning policies. Policy and decision-making on development planning often do not incorporate the implications of the ways in which we use land and the consequences for different places (economic planning. The neglect of place, in particular, the way that different policies combine to affect places in different ways (regional planning, has contributed to a range of negative economic, social and environmental outcomes. This paper relies mainly on the secondary data and literature exploration to demonstrate that the little role accorded to spatial planning, especially, regional planning, in the development efforts is largely responsible for the underdevelopment, imbalance, and inequalities in the country, as well as poverty of the citizens. The conclusion of the paper is that regional planning should be an integral part and complementary to economic planning in the national development planning of the country. For regional planning to aid in the development of the country and promote the well-being of the citizens, appropriate recommendations have been included in the paper.

  7. Kuroshio power plant development plan

    International Nuclear Information System (INIS)

    Chen, Falin

    2010-01-01

    As a country lacking energy reserves, Taiwan imports 99.2% of its energy, with only a small portion of indigenous energy, such as hydro, wind, and solar. In 2008, each Taiwanese spent 85,000 NTD dollars (1 USD ∝ 32 NTD) to purchase oil, coal, gas, and nuclear fuel from foreign countries, accounting for a total payment of 1.8 trillion NTD, more than the annual budget of the Taiwan government of 1.7 trillion NTD. In the same year, Taiwan emitted about 1% of the world's greenhouse gas (GHG), or 12 tons per person-year, ranking 18th globally. These situations in terms of energy security and carbon emission are very severe. To resolve these severe situations, harnessing the power of the Kuroshio in eastern Taiwan offers a great opportunity. The Kuroshio is a branch of the North Pacific Ocean current. Due to the westward-enhanced effect, this ocean current is strong and stable as it passes through eastern Taiwan. The flow rate is about 30 sverdrup (Sv) or 1000 times that of the Yangtze River, the average speed is 1 m/s, the flow direction is fixed to the north, and the flow path is close to the east coast of Taiwan. By precisely locating high-quality sites and implementing sequential works with careful planning, one can possibly generate exploitable power more than 30 GW. With 30 GW of clean energy, Taiwan could effectively enhance energy security, reduce GHG emission, and lower energy-purchasing cost. This paper proposes a feasibility study to explore the power of the Kuroshio. The content consists of four parts: (1) assessment of Kuroshio power reserves, (2) development of turbine generators, (3) development of turbine-anchor system, and (4) deep-sea marine engineering of turbine clusters. By integrating these technologies above, we propose a project to construct a 30 MW pilot plant. In this project, we also discuss the financial analysis and propose new regulations, environmental impact analysis, risk assessment, and other relevant issues. (author)

  8. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  9. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  10. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  11. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    Science.gov (United States)

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  12. Equal employment opportunity plan development guidance

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-09-01

    The purpose of this publication is to provide instructions for the development of EEO Plans for Fiscal Year 1979. It supplements the National EEO Plan for the Department of Energy issued in August 1978 (DOE/S-0002). The material included should be used immediately as guidance to develop, document, and implement subordinate echelon commitments to EEO. A schedule for the development and submission of EEO Plans is included. Most of the continuing requirements will be published at a later date as part of the directives system. Any comments or helpful suggestions concerned with the program outlined would be appreciated by the Office of Equal Opportunity.

  13. Development of a transportation planning tool

    International Nuclear Information System (INIS)

    Funkhouser, B.R.; Moyer, J.W.; Ballweg, E.L.

    1994-01-01

    This paper describes the application of simulation modeling and logistics techniques to the development of a planning tool for the Department of Energy (DOE). The focus of the Transportation Planning Model (TPM) tool is to aid DOE and Sandia analysts in the planning of future fleet sizes, driver and support personnel sizes, base site locations, and resource balancing among the base sites. The design approach is to develop a rapid modeling environment which will allow analysts to easily set up a shipment scenario and perform multiple ''what if'' evaluations. The TPM is being developed on personal computers using commercial off-the shelf (COTS) software tools under the WINDOWS reg-sign operating environment. Prototype development of the TPM has been completed

  14. Environmental development plan: magnetic fusion

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Magnetic Fusion Energy Program (MFE). Environment is defined to include the environmental, health (occupational and public), and safety aspects

  15. 75 FR 29588 - Office of New Reactors: Proposed NUREG-0800; Standard Review Plan Section 13.6.6, Draft Revision...

    Science.gov (United States)

    2010-05-26

    ...; Standard Review Plan Section 13.6.6, Draft Revision 0 on Cyber Security Plan AGENCY: Nuclear Regulatory... Plants,'' on a proposed Standard Review Plan (SRP) Section 13.6.6 on ``Cyber Security Plan'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093560837). The Office of Nuclear Security...

  16. Intertechnology Corporation proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-09-01

    This report has three major parts. The first of these derives the requirements for the Test and Evaluation plan from the System Level Plan which is summarized in Section II. The second part contains the proposed plan to fill these requirements and includes hardware and software recommendations as well as procedures and management considerations. Primary emphasis has been given to the remote site because this is the area in which the commercial part of the demonstration is most unique. Finally, some pre-demonstration activities are described. The pilot program is intended to resolve a number of issues which arose in the course of the T and E plan. These relate to choice of scan frequencies, compression algorithms, etc. It is also intended to confirm performance and cost effectiveness of the site data collection package. The base line measurements of attitudes, etc. provide a reference mark against which one can measure the non-technical effectiveness of the demonstration program. (WDM)

  17. Proposed plan for the management of bulk wastes at the Weldon Spring quarry, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1990-02-01

    This proposed plan addresses the management of contaminated bulk wastes at the Weldon Spring quarry. Activities at the site are being conducted by the US Department of Energy under its Surplus Facilities Management Program. A remedial investigation/feasibility study has been prepared in accordance with requirements of the Comprehensive Environmental Response. The purposes of the proposed plan are to present a notice and brief analysis of the proposed quarry bulk waste remedial action, describe the remedial action alternatives for this interim remedial action, identify the currently preferred alternative for managing the bulk wastes and present the rationale for this preference, serve as a companion document to the RI/FS and administrative record file for this action, and outline the public's role in the decision-making process for this action. 2 figs., 4 tabs

  18. 7 CFR 22.306 - Financing rural development planning.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Financing rural development planning. 22.306 Section... Responsibilities of State Governments § 22.306 Financing rural development planning. States will be required to finance rural development planning through their own resources, revenue-sharing allocations, or the...

  19. Participatory development planning in Botswana: Exploring the ...

    African Journals Online (AJOL)

    the significance of public participation in planning is the ... to participatory planning, Botswana's planning system remains non-participatory. What is perceived as a ..... Administration. Despite the above, the. Tribal Administration remains important to the development planning efforts in Botswana. This could be attributed.

  20. 77 FR 55224 - Notice of Availability of the Proposed Imperial Sand Dunes Recreation Area Management Plan and...

    Science.gov (United States)

    2012-09-07

    ... Availability of the Proposed Imperial Sand Dunes Recreation Area Management Plan and California Desert... California Desert Conservation Area (CDCA) Plan Amendment/Final Environmental Impact Statement (EIS), for the.... District Court in September 2006. Portions of the biological opinion for the Peirson's milkvetch were also...

  1. THE PROGRAM-TARGET PLANNING AND MANAGEMENT OF DEVELOPMENT OF MEASURING EQUIPMENT PARK

    Directory of Open Access Journals (Sweden)

    Marichev Pavel Aleksandrovich

    2018-02-01

    Full Text Available Subject: study of the Park of Measuring Equipment (PME that includes hundreds of thousands of standard samples, measuring instruments, control and measuring devices and other measuring mechanisms with different areas of application, levels of reliability, service life, levels of technical perfection and levels of technical condition. Research objectives: 1. Development of a complex of mathematical models to simulate the processes of development of PME, control indicators of PME performance as a whole, purposefully control the stages of life cycle of measuring equipment samples. 2. Development of the method which, with a sufficient degree of validity and objectivity, would solve the tasks of management of procurement and repairs both in preparation of proposals for preliminary long-term plan documents (LTPD and to ensure control over the implementation of adopted plans. Thus, the method being developed should be fairly simple to use, easily adjustable for solving problems of different dimensions, suitable for solving the optimal control problem for PME as a whole, for a part of PME, and also suitable for solving a generalized problem for certain “aggregated objects” such as the Metrology Centers. Materials and methods: the methods of mathematical simulation, methods of comparative analysis, simplex method for solving linear programming problem, methods of program-target planning were used. Results: an approach to the solution of problems of program-target planning based on solving a series of linear programming problems has been developed. The results have been presented of using the approach both for formulation of proposals into the preliminary LTPD and also for introducing revisions (amendments to annual plans, which are implemented in the framework of the state defense order. Conclusions: the described method and algorithms constitute an effective tool for solving practical problems of target-oriented management of PME performance

  2. Information Communication Technology Planning in Developing Countries

    Science.gov (United States)

    Malapile, Sandy; Keengwe, Jared

    2014-01-01

    This article explores major issues related to Information Communication Technology (ICT) in education and technology planning. Using the diffusion of innovation theory, the authors examine technology planning opportunities and challenges in Developing countries (DCs), technology planning trends in schools, and existing technology planning models…

  3. Governance in regional development planning?

    DEFF Research Database (Denmark)

    Galland, Daniel

    2008-01-01

    The purpose of this paper is to lay part of the groundwork for a new project aimed at exploring governance aspects concerned with regional development planning (RDP) in Denmark. The fundamental objective is to help establish and clarify a number of research questions to delve into the conditions...... and opportunities for anchoring and implementing such RDP. The paper mainly adopts a descriptive approach to portray tentative pathways to explore and discuss regional governance structures, procedures and practices that are being developed in establishing new RDP processes, strategies and plans....

  4. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  5. Planning developments in British Nuclear Fuels Ltd

    Energy Technology Data Exchange (ETDEWEB)

    Roper, D A [British Nuclear Fuels Ltd., Risley

    1978-10-01

    The state of the corporate planning art in British Nuclear Fuels Ltd. was described by N.R.Geary (Long Range Planning, September (1973)) just 2 years after Company formation. This article discusses more recent planning developments over the period to date during which the Company adopted a Divisionalized structure (from October 1974) and has been required to submit an annual Company plan to the Department of Energy (from November 1975). Background information on the origin and nature of the BNFL and its business, and the particular features of the Company which reflect into the nature and method of its planning were given in the 1973 article and only a brief introductory updating of the Company position is included here. Subsequently the features and problems of BNFL's operating and development planning system are described. Finally, messages arising from BNFL's planning experience to date which may be of general application and therefore of value to other practitioners of planning are listed.

  6. Deep-Burn Modular Helium Reactor Fuel Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    McEachern, D

    2002-12-02

    the Design Data Needs to: (1) fabricate the coated particle fuel, (2) predict its performance in the reactor core, (3) predict the radionuclide release rates from the reactor core, and (4) predict the performance of spent fuel in a geological repository. The heart of this fuel development plan is Section 6, which describes the development activities proposed to satisfy the DDNs presented in Section 5. The development scope is divided into Fuel Process Development, Fuel Materials Development, Fission Product Transport, and Spent Fuel Disposal. Section 7 describes the facilities to be used. Generally, this program will utilize existing facilities. While some facilities will need to be modified, there is no requirement for major new facilities. Section 8 states the Quality Assurance requirements that will be applied to the development activities. Section 9 presents detailed costs organized by WBS and spread over time. Section 10 presents a list of the types of deliverables that will be prepared in each of the WBS elements. Four Appendices contain supplementary information on: (a) design data needs, (b) the interface with the separations plant, (c) the detailed development schedule, and (d) the detailed cost estimate.

  7. PSSD - Planning System for Sustainable Development

    DEFF Research Database (Denmark)

    PSSD - Planning System for Sustainable Development - is a part of the Baltic Sea Region's INTERREG II C program. The current report describes some theories, methods and tools developed under the PSSD project. First, the theoretical foundation of the project is described. Secondly, the role...... of indicators in sustainable development is discussed and a Web-based indicator generator is described. Thirdly, we describe a number of methods and tools, which support planning for sustainable development. Finally, some technical interface tools - especially a Web-based interface to the methods and tools...

  8. PTTSA Action Plan Report

    International Nuclear Information System (INIS)

    1991-02-01

    The Pre-Tiger Team Self-Assessment (PTTSA) Report identified findings with respect to the way Sandia National Laboratories (SNL), Albuquerque, (including Tonopah Test Range (TTR) and Kauai Test Facility (KTF)) conducts its environment, safety, and health (ES ampersand H) activities. It presented Action Plan Requirements (APR) addressing these findings. The purpose of this PTTSA Action Plan Report is to assist in managing these action plan requirements by collecting, prioritizing, and estimating required resources. The specific objectives addressed by this report include: collection of requirements for the resolution of the findings presented in the PTTSA Report; consolidation of proposed Action Plan Requirements into logical Action Plan groupings for efficiency of resolution; categorization of Action Plans according to severity of the hazards represented by the findings; provision of a basis for long-range planning and issues management; documentation of the status of the proposed corrective actions; establishment of traceability of the corrective action to the original problem or issue; and integration of these plans into the existing ES ampersand H structure. The Action Plans in this report are an intermediate step between the identification of a problem or a finding in the PTTSA Report and the execution of the solution. They consist of requirements for solution, proposed actions, and an estimate of the time and (where applicable) resources required to develop the solution. This report is an input to the process of planning, resource commitment, development, testing, implementation, and maintenance of problem resolution. 2 figs

  9. Developing Support Systems for Supporting Entrepreneurs and Small Business in Agrotechnology in Kluang, Johor : A Proposal Using the Cluster Based Approach

    OpenAIRE

    Chieng, Ngee Yew Clifford

    2013-01-01

    The aim of this report is to conduct a study on a proposal to develop support systems for entrepreneurs and small businesses in agrotechnology (“Proposal”). The study of the Proposal will include the use of a cluster-based approach to evaluate and guide the planned development of three pieces of land (“Proposed Land”) with a total combined area of approximately 60 acres in the district of Kluang, Johor, Malaysia. This report will begin with an overview and an analysis of the agriculture secto...

  10. A situational analysis of pharmacovigilance plans in the Global Fund Malaria and U.S. President's Malaria Initiative proposals.

    Science.gov (United States)

    Stergachis, Andy; Bartlein, Rebecca J K; Dodoo, Alexander; Nwokike, Jude; Kachur, S Patrick

    2010-05-30

    Pharmacovigilance programmes can monitor and help ensure the safe use of medicines that are critical to the success of global public health programmes. The widespread deployment of artemisinin-based combination therapy (ACT) by national malaria control programmes as part of the overall Global Malaria Action Plan for malaria control to elimination and eradication makes ACT an excellent candidate for pharmacovigilance activities. In 2008, The Roll Back Malaria partnership issued guidelines for inclusion of pharmacovigilance in Global Fund and other related proposals. In light of this recommendation and the rapid scale-up of ACT worldwide, an analysis of Global Fund Round 8 proposals and the President's Malaria Initiative (PMI) 2009 Malaria Operational Plans was conducted to assess if and how pharmacovigilance has been incorporated into countries' national malaria plans and donor budget requests. The Global Fund-Malaria Round 8 proposals for the 26 countries and the PMI Malaria Operational Plans (MOPs) for fiscal year 2009 for the 15 countries that were approved and received funding from either the Global Fund-Malaria Round 8 or PMI were accessed through the programme websites. The analysis consisted of conducting word counts and key word in context analyses of each proposal and plan. Twelve out of 26 (46%) of the Global Fund proposals mentioned that established pharmacovigilance systems were present in their countries. Four of the fifteen PMI MOPs (27%) mentioned that established pharmacovigilance systems were present in their countries. Only seven of the 26 (27%) Global Fund proposals included a request for funding for new or current pharmacovigilance activities. Seven of 15 (47%) MOPs included a request for funding for pharmacovigilance activities. There were relatively few requests for funding for pharmacovigilance activities, demonstrating a lack of emphasis placed on pharmacovigilance systems in recipient countries. The findings stress the need for more active

  11. Control System Development Plan for the National Spherical Torus Experiment

    International Nuclear Information System (INIS)

    Neumeyer, C.; Mueller, D.; Gates, D.A.; Ferron, J.R.

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has as one of its primary goals the demonstration of the attractiveness of the spherical torus concept as a fusion power plant. Central to this goal is the achievement of high plasma β ( = 2 micro 0 /B 2 a measure of the efficiency of a magnetic plasma confinement system). It has been demonstrated both theoretically and experimentally that the maximum achievable β is a strong function of both local and global plasma parameters. It is therefore important to optimize control of the plasma. To this end a phased development plan for digital plasma control on NSTX is presented. The relative level of sophistication of the control system software and hardware will be increased according to the demands of the experimental program in a three phase plan. During Day 0 (first plasma), a simple coil current control algorithm will initiate plasma operations. During the second phase (Day 1) of plasma operations the control system will continue to use the preprogrammed algorithm to initiate plasma breakdown but will then change over to a rudimentary plasma control scheme based on linear combinations of measured plasma fields and fluxes. The third phase of NSTX plasma control system development will utilize the rtEFIT code, first used on DIII-D, to determine, in real-time, the full plasma equilibrium by inverting the Grad-Shafranov equation. The details of the development plan, including a description of the proposed hardware will be presented

  12. History of Planning Structure Development in Irkutsk

    Science.gov (United States)

    Kulakov, A. I.; Ree, A. U.

    2017-11-01

    The development of Irkutsk was spontaneous; the first streets represented a rather complex system of streets, dead ends, lanes. Throughout the history of the city, several general plans and development projects have been implemented (but not completely). Unlike other large Siberian cities (Novosibirsk, Krasnoyarsk), Irkutsk managed to preserve its historical appearance, architecture and initial planning. During its history the city has passed five stages of the planning structure development. The first stage of the city’s history coincides with the formation of the Russian settlements network in Eastern Siberia from the middle of the 17th to the end of the 18th centuries. Like many other Siberian cities, Irkutsk began its evolution from a fortified stockaded town. By the end of the 17th century a trading quarter appeared outside its walls. Currently, the city is developing and growing, so, a relevant issue of the further development direction of the Irkutsk planning structure naturally arises.

  13. Wetland Planning: Current Problems and Environmental Management Proposals at Supra-Municipal Scale (Spanish Mediterranean Coast

    Directory of Open Access Journals (Sweden)

    María-Teresa Sebastiá-Frasquet

    2014-03-01

    Full Text Available The policies that define the use and management of wetlands in Spain have undergone tremendous changes in recent decades. During the period of 1950–1980, Land Reform Plans promoted filling and draining of these areas for agricultural use. In 1986, with the incorporation of Spain to the European Union (EU, there was a sudden change of direction in these policies, which, thereafter, pursued restoring and protecting these ecosystems. This change, combined with increasing urban development and infrastructure pressures (e.g., roads, golf courses, etc., creates a conflict of uses which complicates the management of these ecosystems by local governments. This study analyzes the effectiveness of policies and management tools of important coastal wetlands at the local scale in the Valencian Community (Western Mediterranean Sea using a strengths-weaknesses-opportunities-threats (SWOT methodology. A supra-municipal model of environmental planning is proposed to enable consistent management at a regional scale. This model enhances local government’s effectiveness and it can be applied in other areas with similar problems.

  14. Environmental Development Plan (EDP): magnetohydrodynamics program, FY 1977

    International Nuclear Information System (INIS)

    1978-03-01

    This magnetohydrodynamics (MHD) EDP identifies and examines the environmental, health, and safety issues concerning the development of the ERDA Magnetohydrodynamics Program, the environmental activities needed to resolve these issues, applicable ongoing and completed research, and a time-phased action plan for the evaluation and mitigation of environmental impacts. A schedule for environmental research, assessment, and other activities is laid out. The purpose of the EDP is to identify environmental issues and to specify actions to ensure the environmental acceptability of commercial energy technologies being developed by ERDA. The EDP also will assist in coordinating ERDA's environmental activities with those of other government agencies. This document addresses the following technologies associated with ERDA's MHD program: (1) open-cycle magnetohydrodynamics; (2) closed-cycle plasma magnetohydrodynamics; and (3) closed-cycle liquid metal magnetohydrodynamics. The proposed environmental action plan is designed to meet the following objectives: (1) develop methods for monitoring and measuring emissions; (2) characterize air emissions, water effluents, and solid wastes from MHD; (3) determine potential environmental impacts and health hazards associated with MHD; (4) model pollutant transport and transformation; (5) ensure adequate control of pollutant emissions; (6) identify and minimize occupational health and safety hazards; (7) prepare NEPA compliance documents; and (8) assess the environmental, health, and safety impacts of the commercialized industry. This EDP will be updated and revised annually to take into account the progress of technologies toward commercialization, the environmental work accomplished, and the resolution of outstanding environmental issues concerning the technologies

  15. An Approach to Evaluate Comprehensive Plan and Identify Priority Lands for Future Land Use Development to Conserve More Ecological Values

    Directory of Open Access Journals (Sweden)

    Long Zhou

    2018-01-01

    Full Text Available Urbanization has significant impacts on the regional environmental quality through altering natural lands, converting them to urban built-up areas. One common strategy applied by urban planners to manage urbanization and preserve natural resources is to make a comprehensive plan and concentrate future land use in certain areas. However, in practice, planners used to make future land use planning mainly based on their subjective interpretations with limited ecological supporting evidence and analysis. Here, we propose a new approach composed of ecological modelling and land use zoning in the spatial matrix to evaluate the comprehensive plan and identify priority lands for sustainable land use planning. We use the city of Corvallis, OR, as the test bed to demonstrate this new approach. The results indicate that the Corvallis Comprehensive Plan 1998–2020 featured with compact development is not performing efficiently in conserving ecological values, and the land use plan featured with mixed-use spreading development generated by the proposed approach meets the city’s land demands for urban growth, and conserves 103% more ecological value of retaining storm water nitrogen, 270% more ecological value of retaining storm water phosphorus and 19% more ecological value in storing carbon in the whole watershed. This study indicates that if planned with scientific analysis and evidence, spreading urban development does not necessarily result in less sustainable urban environment than the compact development recommended in smart growth.

  16. Non-nucleon degrees of freedom in nuclei and ABC plan for developing fundamental nuclear theories

    International Nuclear Information System (INIS)

    Zhang Qiren

    1996-01-01

    We emphasize that to develop a fundamental nuclear theory one has to consider various non-nucleon degrees of freedom in nuclei and to make the theory relativistic. A three step ABC Plan for this purpose is proposed. The A pan is to reform the relativistic hadron field theory by taking the finite baryon size into account. We call finite size baryons atoms in contrast with points. The fundamental nuclear theory in this form is therefore a quantum atom dynamics (QAD). The B plan is to reform the bag model for hadrons by making it be quantum bag dynamics (QBD). This is a model fundamental nuclear theory on the quark level. The fundamental nuclear theory should eventually be developed on the basis of quantum chromodynamics (QCD). This is the C Plan

  17. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  18. The Analysis of the Tourism Plan within a Cross-border Development Strategy

    Directory of Open Access Journals (Sweden)

    Tvrtko Josip Čelan

    2015-04-01

    Full Text Available This paper presents the Regional Tourism Product Plan (RTPP and analyses the strategic approach in the planning of tourism. Until 1 July 2013 the Hungary-Croatia Cross-border Co-operation Programme 2007-2013 (hereinafter HU-HR (IPA CBC Programme was part of the Instrument for Pre-Accession Assistance (IPA. Compared to the previous periods, IPA brought significant development in co-operation, by introducing single set of rules and the Lead Beneficiary principle. The HU-HR (IPA CBC Programme applied a new two-step development of tourism. First, it prescribed the preparation of RTPP within a special project and only after the RTPP was elaborated could the open call for tourism proposals be launched. There was no similar case in other CBC programmes. The author will review the Programme level documents and reports, furthermore, examine the RTPP outcomes and the methodology introduced in the planning of tourism actions in the Programme. The risks RTPP involved and its influence on the implementation of the Programme and tourism projects will be investigated by highlighting the problems of application of RTPP in practice. The aim of this work is to focus on and to evaluate this specific planning methodology, and to assess whether it could be recommended to other similar programmes. Due to the shortcomings that the RTPP entailed, the author will come to conclusion that the planning of such strategies has to be prepared in advance and that the two-step approach of tourism development should not be recommended to other cross-border programmes.

  19. 75 FR 6413 - Office of New Reactors; Proposed Revision to Standard Review Plan, Section 14.3.12 on Physical...

    Science.gov (United States)

    2010-02-09

    ... Standard Review Plan, Section 14.3.12 on Physical Security Hardware Inspections, Tests, Analyses, and.... SUMMARY: The NRC is soliciting public comment on NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' on a proposed Revision 1 to Standard Review Plan (SRP...

  20. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  1. Walking the Torque: Proposed Work Plan for Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Electric motor-driven system is the largest single energy end use accounting for more than 40% of global electricity consumption. This paper sets out an ambitious but achievable target with the global work plan to improve the energy efficiency of electric motor-driven system by 10% to 15% based on the finding of working paper ''Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems (Waide et al., 2011)''. If governments commit to the proposed work plan immediately and maintain resourcing levels, this could be achieved by 2030 and it would be equivalent to reducing total global electricity use by around 5%. The proposed work plan of this paper is to align regulatory settings within a globally applicable scheme. The IEA believes this target can only be achieved through global co-operation leading to aligned national policy settings that countries can unlock the economies of scale that will result from using more energy efficient EMDS.

  2. Settlement Networks in Polish Spatial Development Regional Plans

    Science.gov (United States)

    Sołtys, Jacek

    2017-10-01

    In 1999, ten years after the great political changes in Poland, 16 self-governed regions (in Polish: voivodeship) were created. According to Polish law, voivodeship spatial development plans, or regional plans in short, determine basic elements of the settlement network. No detailed regulations indicate the specific elements of the settlement network or what features of these elements should be determined. For this reason, centres as elements of the settlement network are variously named in different regions and take the form of various models. The purposes of the research described in this article are: (1) recognition and systematization of settlement network models determined in regional plans; and (2) assessment of the readability of determination in planning and its usefulness in the practice of regional policy. Six models of settlement networks in regional plans have been identified and classified into types and sub-types. Names of specific levels of centres indicate that they were classified according to two criteria: (1) level of services, which concerns only 5 voivodships; and (2) importance in development, which concerns the 11 other voivodships. The hierarchical model referring to the importance of development is less understandable than the one related to services. In the text of most plans, centres of services and centres of development are treated independently from their names. In some plans the functional types of towns and cities are indicated. In some voivodships, specifications in the plan text are too general and seem to be rather useless in the practice of regional policy. The author suggests that regional plans should determine two kinds of centres: hierarchical service centres and non-hierarchical centres of development. These centres should be further distinguished according to: (1) their role in the activation of surroundings; (2) their level of development and the necessity of action for their development; and (3) the types of actions

  3. Environmental Development Plan: uranium enrichment

    International Nuclear Information System (INIS)

    1979-09-01

    This Environmental Development Plan identifies and examines the environmental, health, safety, and socioeconomic concerns and corresponding requirements associated with the DOE research, development, demonstration, and operation of the Uranium Enrichment program, including the gaseous diffusion process, the centrifuge process, centrifuge rotor fabrication, and related research and development activities

  4. Development concept plan

    International Nuclear Information System (INIS)

    1992-06-01

    The following management objectives for New River Gorge National River relate to the Kaymoor site to: Preserve coal mining, railroad, and other historic resources that best illustrate park significance; Develop a system of land- and water-based recreation opportunities that allow visitors to experience the park's resources to the extent that natural, cultural, and scenic values are not imparied; and Work with the community to the extent possible to help it maximize economic benefits related to park development without impairing key resources. The Development Concept Plant outlining a plan of development for Kaymoor is a part of a larger emphasis by the National Park Service to identify and develop significant coal-related historic and cultural resources in southern West Virginia in cooperation with the West Virginia State Historic Preservation Office

  5. Ensuring Sustainable Development through Urban Planning in Pakistan

    Directory of Open Access Journals (Sweden)

    Mohammad Qasim

    2013-04-01

    Full Text Available Urban planning includes land use management and environmental change. It makes arrangement for community facilities and services. Since, sustainable development has been included as a vital end product of all planning goals it also provides for balanced use of land, housing and transportation and better quality of life. Present urban planning in Pakistan is not ensuring sustainable development in Pakistan. This is tested through the case study of master planning in Rawalpindi and its implementation through housing schemes in Rawalpindi, Pakistan. Large portions of provisions of master plans are not implemented. This paper explains how the urban planning will be made enabled to ensure sustainable development in Pakistan. Six numbers of housing schemes and two squatter settlements have been surveyed through questionnaires, secondary data, the opinions of the experts from related fields and site observations. Amenities and social services at far distance, very less green area, Less quantity and bad quality of water, absence of comprehensive solid waste management and sewage disposal system and nontreatment of solid waste, effluent and sewage, prevalent unhygienic conditions and air and water pollution are the existing factors effecting the sustainability. There is a need to revisit the urban planning and a comprehensive Urban and Environment Planning Law at national level and at provincial level is recommended to enable the urban planning to ensure the sustainable development in Pakistan

  6. Independent Planning System and Public Administration in Metropolitan Development: Agglomeration Strategies of Greater Chaoshan in Southern China

    Directory of Open Access Journals (Sweden)

    Tian Guang

    2017-04-01

    Full Text Available This paper examines independent planning system as a means of public administration in regional economic development. It proposes a new strategy based on the theories of public administrative resources, to agglomerate and unify the cities of Shantou, Jieyang, and Chaozhou into a new administrative entity as a metropolis with the status of independent planning and the preferred policies of a Special Economic Region to lead regional development. The optimal allocation of public administrative resources has played a key role in the fundamental economic development in China in recent years. The new administrative system of large cities (metropolises with independent planning has become an innovative format to utilize the renewable soft resources of administration, which in fact is a new attempt to reform the economic system by the Chinese government. The greater Chaoshan area needs to be agglomerated and unified to further develop the regional economy with the implementation of independent planning system. The current research conducted from a practical and political point of view is of significant value to the overall planning and strategic layout of the economic and social development of the whole eastern Guangdong region.

  7. Fact Sheet: Proposed Rule: State Plans to Address Emissions During Startup, Shutdown, and Malfunction (SSM)

    Science.gov (United States)

    On February 12, 2013, the U.S. Environmental Protection Agency (EPA) proposed a rule that would ensure states have plans in place that require industrial facilities across the country to follow air pollution rules during SSM operations.

  8. American’s Energy Future: An Analysis of the Proposed Energy Policy Plans in Presidential Election

    Directory of Open Access Journals (Sweden)

    Ming-Hsun Cheng

    2016-11-01

    Full Text Available As the leader of the largest economy, President of the United States has substantive influence on addressing climate change problems. However, a presidential election is often dominated by issues other than energy problems. This paper focuses on the 2016 presidential election, and examines the energy plans proposed by the leading Democrat and Republican candidates. Our data from the Iowa caucus survey in January 2016 suggests that voters were more concerned about terrorism and economic issues than environmental issues. We then compare the Democratic and Republican candidate’s view of America’s energy future, and evaluate their proposed renewable energy targets. We find that the view on renewable energy is polarized between Democratic and Republican candidates, while candidates from both parties agree on the need for energy efficiency. Results from our ordinal least squares regression models suggests that Democratic candidates have moderate to ambitious goals for developing solar and other renewables. The Republican candidates favor fossil fuels and they choose not to provide any specific target for developing renewable energy. In addition, this trend of party polarization has grown more significant when compared with the past three presidential elections. Our observation suggests that energy policies need to be discussed more often regarding the diversification and decarbonization of the nation’s energy system.

  9. Developing a disposal and remediation plan

    International Nuclear Information System (INIS)

    Messier, T.S.

    1999-01-01

    The environmental release of wastes generated by the upstream oil and gas industry in Alberta can result in polluted soil and groundwater at several facilities across the province. Responsibility for decommissioning upstream oil and gas facilities falls under the jurisdiction of the Alberta Energy and Utilities Board (EUB) and Alberta Environmental Protection (AEP). This paper outlines a protocol that can serve as a framework for the development of a plan to dispose of oilfield waste and to remediate related contaminated soils. The components involved in developing a disposal and remediation plan for oilfield wastes are: (1) identifying the potential source of pollution and oilfield waste generation, (2) characterizing oilfield wastes, (3) determining the nature and extent of soil and groundwater pollution, (4) preparing a remedial action plan, (5) assessing the viability of various remediation options, and (6) preparing health and safety plan. 12 refs., 2 tabs., 2 figs

  10. Multi area and multistage expansion-planning of electricity supply with sustainable energy development criteria: a multi objective model

    Energy Technology Data Exchange (ETDEWEB)

    Unsihuay-Vila, Clodomiro; Marangon-Lima, J.W.; Souza, A.C Zambroni de [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], emails: clodomirounsihuayvila @gmail.com, marangon@unifei.edu.br, zambroni@unifei.edu.br; Perez-Arriaga, I.J. [Universidad Pontificia Comillas, Madrid (Spain)], email: ipa@mit.edu

    2010-07-01

    A novel multi objective, multi area and multistage model to long-term expansion-planning of integrated generation and transmission corridors incorporating sustainable energy developing is presented in this paper. The proposed MESEDES model is a multi-regional multi-objective and 'bottom-up' energy model which considers the electricity generation/transmission value-chain, i.e., power generation alternatives including renewable, nuclear and traditional thermal generation along with transmission corridors. The model decides the optimal location and timing of the electricity generation/transmission abroad the multistage planning horizon. The MESEDES model considers three objectives belonging to sustainable energy development criteria such as: a) the minimization of investments and operation costs of : power generation, transmission corridors, energy efficiency (demand side management (DSM) programs) considering CO2 capture technologies; b) minimization of Life Cycle Greenhouse Gas Emissions (LC GHG); c) maximization of the diversification of electricity generation mix. The proposed model consider aspects of the carbon abatement policy under the CDM - Clean Development Mechanism or European Union Greenhouse Gas Emission Trading Scheme. A case study is used to illustrate the proposed framework. (author)

  11. Research and development quality assurance planning

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  12. Research and development quality assurance planning

    International Nuclear Information System (INIS)

    Hoke, P.B.

    1990-01-01

    Planning for quality assurance (QA) in research and development (R ampersand D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R ampersand D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R ampersand D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig

  13. Economic planning and social justice in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Mehmet, O

    1978-01-01

    This book argues that development in LDCs (Less Developed Countries) cannot proceed in a sequential path - with income growth first and distribution after. Instead, egalitarian development, based on a combination of efficiency and equity criteria in the planning process, would emphasize employment creation, human resources, and rural and agricultural development, rather than urban-based industrial growth relying on imported capital-intensive technology. This, complemented with reforms in the political system, would be more in accord with the social needs and realities of LDCs. In particular, decentralized economic planning, responsive to the needs of rural communities, would offer an effective nonviolent revolutionary alternative. It is argued that egalitarian development is not only dependent on domestic reforms in LDCs, but also on a restructuring of international trade, aid and monetary systems for a more-equitable global distribution of income and wealth between nations. The book is divided into three parts: (1) devoted to a critical review of postwar growth and planning strategies; (2) based upon five case studies of Malaysia, Liberia, Pakistan, Brazil and Uganda, examines the influence of elites on economic planning and policy; and (3) offers elements of an egalitarian development planning. The book concludes with a brief summary on egalitarian planning as a non-violent revolution.

  14. 77 FR 33788 - Proposed Post Office Structure Plan

    Science.gov (United States)

    2012-06-07

    ... Plan AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request for an advisory opinion regarding its Post Office Structure Plan... Commission for an advisory opinion under 39 U.S.C. 3661 regarding its Post Office Structure Plan (POStPlan...

  15. The politico-economics of electricity planning in developing countries: A case study of Ghana

    International Nuclear Information System (INIS)

    Abdul-Salam, Yakubu; Phimister, Euan

    2016-01-01

    Off-grid technologies are increasingly being proposed as a way of ensuring cost efficient universal access to electricity in many developing countries. However, many un-electrified communities would prefer access to electricity via the national grid rather than off-grid technologies. Electricity planning based on cost efficiency alone could therefore be undermined by political pressure from discontented communities that are assigned off-grid technologies. Using a case study of un-electrified communities in Ghana, we develop an electricity planning algorithm based on hierarchical lexicographic programming and consider specifications where the priorities are adjusted to give weight to (1) cost efficiency and (2) political economy considerations so that communities with larger populations (and therefore votes) are given priority in terms of grid electrification. The results emphasise the need to incorporate the political economy considerations in the national planning of universal electrification, showing significant regional differences in terms of where grid extensions ought to be placed. Incorporating a political economy perspective in national planning also suggests that the most important policy trade-offs shift from considering the grid versus off-grid balance to focussing more on the effectiveness of grid investment in providing universal access. - Highlights: • There is a focus on grid and off-grid electricity planning based on economics. • However community preferences for grid introduces a political dimension to planning. • We develop an algorithm to examine the politico-economics of electricity planning. • We find different priorities yield significant regional differences in grid access. • We find that greater policy focus on the effectiveness of grid investment is needed.

  16. Proposed standby gasoline rationing plan. Economic and regulatory analysis draft

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-01

    This economic and regulatory analysis meets the requirements of the Energy Policy and Conservation Act, which calls for an evaluation of the potential economic impacts of the gasoline rationing contingency plan. In addition, this analysis is intended to satisfy the requirements of the President's Executive Order No. 12044 of March 23, 1978, regarding government regulations, and provides an inflationary impact statement for the proposed rationing plan. To perform the analysis of rationing program impacts on the total national economy, three separate projections were required. First, a projection is made of the ''normal'' U.S. economy for a future period--the last quarter of 1980 through the third quarter of 1981 in this analysis. Second, a projection is made of the impacts which a petroleum supply interruption would have on the U.S. economy during this future period, assuming that DOE's standby allocation and price control regulations were implemented for crude oil and products. Third, and most significant, an estimate is made of the incremental impacts of the gasoline rationing program on this already-perturbed future U.S. economy.

  17. Practice and professional development plans (PPDPs): results of a feasibility study.

    Science.gov (United States)

    Elwyn, G; Carlisle, S; Hocking, P; Smail, S

    2001-01-01

    Dissatisfaction with uniprofessional education structures as a means of improving the quality of healthcare has led to proposals to develop ways of integrating professional learning and organisational development. Test the feasibility of introducing practice and professional development plans using a centrally sponsored project in Wales. Qualitative observational study. All 541 practices in Wales were alerted to the project and invited to apply. A selection process was suggested to Health Authorities but not always efficiently conducted: 23 practices were selected and 18 participated in the process. Central funding was made available to health authorities. The project framework was designed by an educational department and conceptualised as the development of personal portfolios linked to one key organisation change in each practice, facilitated by external consultants who would typically hold workshops or other events. An independent researcher using non-participant observation techniques at workshops and practices undertook documentary analysis and fieldwork in four health authorities. Difficulties were encountered with the process of implementing the project: marketing and practice selection inconsistencies delayed the work and it was difficult to recruit practices into the project. The lack of experienced individuals to do the work and practitioner suspicion about perceived 'management' agendas were significant problems. After initial hesitancies most practices appreciated the value of developing wider ownership and commitment to proposed practice changes. Organisations found it difficult to support individual completion of the personal portfolio component of the plans. The ability to develop systems for clinical services was dependent on having already established a culture of effective teamwork in the organisation. This work supports the view that organisational development has considerable potential for bringing about effective change, and individual

  18. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  19. Planners to the rescue: spatial planning facilitating the development of offshore wind energy.

    Science.gov (United States)

    Jay, Stephen

    2010-04-01

    The development of offshore wind energy has started to take place surprisingly quickly, especially in North European waters. This has taken the wind energy industry out of the territory of planning systems that usually govern the siting of wind farms on land, and into the world of departmental, sectoral regulation of marine activities. Although this has favoured the expansion of offshore wind energy in some respects, evidence suggests that the practice and principles of spatial planning can make an important contribution to the proper consideration of proposals for offshore wind arrays. This is especially so when a strategic planning process is put in place for marine areas, in which offshore wind is treated as part of the overall configuration of marine interests, so that adjustments can be made in the interests of wind energy. The current process of marine planning in the Netherlands is described as an illustration of this. (c) 2009 Elsevier Ltd. All rights reserved.

  20. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  1. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-051552, LLCAD0700 L51010000 FX0000 LVRWB10B3980] Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management, Interior...

  2. Idaho National Engineering Laboratory site development plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan briefly describes the 20-year outlook for the Idaho National Engineering Laboratory (INEL). Missions, workloads, worker populations, facilities, land, and other resources necessary to fulfill the 20-year site development vision for the INEL are addressed. In addition, the plan examines factors that could enhance or deter new or expanded missions at the INEL. And finally, the plan discusses specific site development issues facing the INEL, possible solutions, resources required to resolve these issues, and the anticipated impacts if these issues remain unresolved

  3. Plan of development of ZrC-TRISO coated fuel particle and construction of ZrC coater

    Energy Technology Data Exchange (ETDEWEB)

    Ueta, Shohei; Ino, Hiroichi; Sawa, Kazuhiro [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Tobita, Tsutomu [Nuclear Engineering Company, Ltd., Tokai, Ibaraki (Japan); Takahashi, Masashi [Nuclear Fuel Industries, Ltd., Tokyo (Japan)

    2002-11-01

    In order to use coated fuel particle under higher temperature condition, more refractory coating material, which is more refractory than conventional silicon carbide (SiC), should be applied. Zirconium carbide (ZrC) is considered to be one of the promising materials, which is proposed as candidate for VHTR fuel material in GENERATION-IV, because of its intactness under high temperature of around 2000degC and its higher stability against kernel migration (amoeba effect) and fission product corrosion under normal operating condition. In order to develop ZrC coated particle for commercial use, research and development items were extracted based on review of the previous works. Research and development plan was determined. Based on the plan, a new ZrC coater of 100g batch size, which applies bromine process, was constructed. This report describes the review of precious works, extracted research and develop items and plan, and specifications of the ZrC coater. (author)

  4. The Challenges of Implementing Sustainable Development: The Case of Sofia’s Master Plan

    Directory of Open Access Journals (Sweden)

    Aleksandar D. Slaev

    2016-12-01

    Full Text Available In this paper, we explore how master planning promotes and implements particular urban development patterns and, more generally, contributes to sustainability. Our goal is to understand the link between urban growth intentions articulated through the master planning process and realisation of its specific forms, e.g., monocentric or polycentric, compact or dispersed. As a case study, we examine the current General Urban Development Plan (GUDP of the Bulgarian capital Sofia against the city’s actual development pattern. We observe that the primary goals of the GUDP are to promote a polycentric urban structure and low-density expansion, as well as preserve green edges. While the question of whether and how these goals reflect the sustainability ideal requires further consideration, there are some indications that Sofia’s GUDP may not be effective in encouraging sustainable forms of growth. Substantial inconsistencies exist between the plan’s overall goals and some of its measures and implementation tools. The results on the ground suggest that, despite the plan’s low-density aspirations, Sofia is becoming more compact and densified, while losing its green edges and failing to redirect growth to its northern territories where ample space and opportunities exist. We conclude that employing the achievements of research on sustainability and developing relevant implementation tools such as more effective zoning regulations and viable suburban transportation infrastructure are necessary for realising both the patterns proposed through master planning and achieving sustainable urban growth.

  5. Center Planning and Development Student Engineer at KSC

    Science.gov (United States)

    Jenkins, Kenneth T., Jr.

    2015-01-01

    This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

  6. Proposed plan for remedial action at the chemical plant area of the Weldon Spring site

    International Nuclear Information System (INIS)

    1992-11-01

    This proposed plan addresses the management of contaminated material at the chemical plant area of the Weldon Spring site and nearby properties in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry, both of which are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced at the chemical plant in the 1940s, and uranium and thorium materials were processed in the 1950s and 1960s. Various liquid, sludge, and solid wastes were disposed of at the Chemical plant area and in the quarry during that time. The Weldon Spring site is listed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The proposed plan is organized as follows: Chapter 2 presents the history and setting of the Weldon Spring site and briefly describes the contaminated material at the chemical plant area. Chapter 3 defines the scope of the remedial action and its role in the Weldon Spring Site Remedial Action Project. Chapter 4 summarizes the risks associated with possible exposures to site contaminants in the absence of remedial action and identifies proposed cleanup levels for soil. Chapter 5 briefly describes the final alternatives considered for the remedial action. Chapter 6 summarizes the evaluation of final alternatives for managing the contaminated material, identifies the currently preferred alternative, and discusses a possible contingency remedy to provide treatment flexibility. Chapter 7 presents the community's role in this action. Chapter 8 is a list of the references cited in this proposed plan

  7. 30 CFR 250.220 - If I propose activities in the Alaska OCS Region, what planning information must accompany the EP?

    Science.gov (United States)

    2010-07-01

    ... Region, what planning information must accompany the EP? 250.220 Section 250.220 Mineral Resources... activities in the Alaska OCS Region, what planning information must accompany the EP? If you propose exploration activities in the Alaska OCS Region, the following planning information must accompany your EP: (a...

  8. Airport Capital Improvement Planning: Stewardship for Airport Development

    Science.gov (United States)

    1997-09-01

    "Airport Capital Improvement Planning: Stewardship for Airport Development", was : originally written in October, 1995. It documented an effort to implement the : concept of capital improvement planning with the airport development industry. : Airpor...

  9. Sustainable community assets:business planning for the (re)development of community buildings

    OpenAIRE

    Moobela, Cletus; Rampton, Leigh

    2009-01-01

    This guide is designed to help you think through making a decision about whether your potential project is worthwhile and viable. Specifically, it seeks to help you look at whether your proposed project is a good for your organisation (business case) whether it is a good investment (investment appraisal) and whether it will likely to be viable when it is completed (business plan). We will also briefly outline the main elements of initiating and managing a (re)development project.

  10. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  11. Smart city planning and development shortcomings

    Directory of Open Access Journals (Sweden)

    Margarita Angelidou

    2017-04-01

    Full Text Available This paper explores smart city planning and development shortcomings. In particular, it investigates eleven cases of smart city strategies and the shortcomings that were observed during their planning and implementation stages. The cases include: Barcelona Smart City, PlanlT Valley, Stockholm Smart City, Cyberjaya, King Abdullah Economic City, Masdar City, Skolkovo, Songdo International Business District, Chicago Smart City, Rio de Janeiro Smart City, and Konza Technology City. The paper proceeds with the synthesis of the findings and their critical appraisal. Shortcomings are classified into economic and budget shortages, bureaucratic and organizational challenges, challenges in the development and layout of digital services, poor physical planning, struggle to attract investment and support the development of new businesses, low performance in attracting and engaging users, and stakeholder resistance. In turn, the shortcomings are clustered in two distinct groups and analyzed in terms of causes and effects. The paper closes with mitigation propositions, accounting for past experience and novel approaches to this end.

  12. Monitoring plan for long-term environmental measurements at the proposed Douglas Point Ecological Laboratory, Nanjemoy, Maryland

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.S.; Nugent, A.

    1979-01-01

    The Douglas Point Ecological Laboratory has been set up at the site of a proposed power plant, which is to be powered by either nuclear, coal, or an alternate form of fuel. A plan for long-range monitoring of terrestrial ecosystems and atmospheric chemistry is presented. A site characterization study will be made initially. Chemical and physical soil profiles will be established with continuous measurement of soil moisture and nutrient content, as well as other parameters. Data sets will be established, reflecting changes in rainfall pH and rate of deposition through precipitation and dryfall sedimentation of Ca 2+ , Mg 2+ , K + , Na + , SO 4 3- , Cl - , NH 4 + , and NO 3 - . Among other objectives are the development of new monitoring techniques that can be used to trace energy flow, nutrient transport, and radionuclide transport through all trophic levels to selected carnivores. The atmospheric monitoring plan is outlined as to system design and specifications; system installation, operation, and maintenance, data processing and reports; quality assurance program; and project organization. A discussion of administrative and operational monitoring costs is included

  13. Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; and analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.

  14. Integrated sustainable development and energy resource planning

    OpenAIRE

    Virgiliu NICULA

    2011-01-01

    Integrated sustainable development of a country cannot be conceived and begun without considering in an intricate tandem environmental protection and economic development. No one can exist without a natural material support of the life he or she enjoys. All economic development plans must include environmental and human civilization’s protection implicitly. Integrated resource planning must be done in an absolutely judicious manner, so we can all leave as a legacy for future generations both ...

  15. 17 CFR 229.1006 - (Item 1006) Purposes of the transaction and plans or proposals.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false (Item 1006) Purposes of the transaction and plans or proposals. 229.1006 Section 229.1006 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION STANDARD INSTRUCTIONS FOR FILING FORMS UNDER SECURITIES ACT OF 1933, SECURITIES EXCHANGE ACT OF 1934 AND ENERGY POLICY...

  16. Proposed Plan for an amendment to the Environmental Restoration Disposal Facility Record of Decision, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the U.S. Department of Energy (Tri- Parties) are proposing an amendment to the Environmental Restoration Disposal Facility Record of Decision (ERDF ROD). EPA is the lead regulatory agency for the ERDF Project. This Proposed Plan includes two elements intended to promote Hanford Site cleanup activities by broadening utilization and operation of ERDF as follows: (1) Construct the planned Phase II of ERDF using the current disposal cell design and (2) enable centralized treatment of remediation waste at ERDF prior to disposal, as appropriate

  17. Optimal sampling plan for clean development mechanism energy efficiency lighting projects

    International Nuclear Information System (INIS)

    Ye, Xianming; Xia, Xiaohua; Zhang, Jiangfeng

    2013-01-01

    Highlights: • A metering cost minimisation model is built to assist the sampling plan for CDM projects. • The model minimises the total metering cost by the determination of optimal sample size. • The required 90/10 criterion sampling accuracy is maintained. • The proposed metering cost minimisation model is applicable to other CDM projects as well. - Abstract: Clean development mechanism (CDM) project developers are always interested in achieving required measurement accuracies with the least metering cost. In this paper, a metering cost minimisation model is proposed for the sampling plan of a specific CDM energy efficiency lighting project. The problem arises from the particular CDM sampling requirement of 90% confidence and 10% precision for the small-scale CDM energy efficiency projects, which is known as the 90/10 criterion. The 90/10 criterion can be met through solving the metering cost minimisation problem. All the lights in the project are classified into different groups according to uncertainties of the lighting energy consumption, which are characterised by their statistical coefficient of variance (CV). Samples from each group are randomly selected to install power meters. These meters include less expensive ones with less functionality and more expensive ones with greater functionality. The metering cost minimisation model will minimise the total metering cost through the determination of the optimal sample size at each group. The 90/10 criterion is formulated as constraints to the metering cost objective. The optimal solution to the minimisation problem will therefore minimise the metering cost whilst meeting the 90/10 criterion, and this is verified by a case study. Relationships between the optimal metering cost and the population sizes of the groups, CV values and the meter equipment cost are further explored in three simulations. The metering cost minimisation model proposed for lighting systems is applicable to other CDM projects as

  18. Patient admission planning using Approximate Dynamic Programming

    NARCIS (Netherlands)

    Hulshof, P.J.H.; Mes, Martijn R.K.; Boucherie, Richardus J.; Hans, Elias W.

    2016-01-01

    Tactical planning in hospitals involves elective patient admission planning and the allocation of hospital resource capacities. We propose a method to develop a tactical resource allocation and patient admission plan that takes stochastic elements into consideration, thereby providing robust plans.

  19. Distance Learning Plan Development: Initiating Organizational Structures

    National Research Council Canada - National Science Library

    Poole, Clifton

    1998-01-01

    .... Army distance learning plan managers to examine the DLPs they were directing. The analysis showed that neither army nor civilian distance learning plan managers used formalized requirements for organizational structure development (OSD...

  20. 77 FR 36287 - Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander, Calaveras...

    Science.gov (United States)

    2012-06-18

    ...-FXES11120800000F2-123-F2] Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander... animal, the threatened Central California Distinct Population Segment of the California tiger salamander (tiger salamander). The applicant would implement a conservation program to minimize and mitigate the...

  1. 78 FR 9028 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan

    Science.gov (United States)

    2013-02-07

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service [Docket No. APHIS-2010-0086] Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan AGENCY: Animal and... Brucella suis, causes loss of young through spontaneous abortion or birth of weak offspring, reduced...

  2. Agricultural Conservation Planning Framework: 3. Land Use and Field Boundary Database Development and Structure.

    Science.gov (United States)

    Tomer, Mark D; James, David E; Sandoval-Green, Claudette M J

    2017-05-01

    Conservation planning information is important for identifying options for watershed water quality improvement and can be developed for use at field, farm, and watershed scales. Translation across scales is a key issue impeding progress at watershed scales because watershed improvement goals must be connected with implementation of farm- and field-level conservation practices to demonstrate success. This is particularly true when examining alternatives for "trap and treat" practices implemented at agricultural-field edges to control (or influence) water flows through fields, landscapes, and riparian corridors within agricultural watersheds. We propose that database structures used in developing conservation planning information can achieve translation across conservation-planning scales, and we developed the Agricultural Conservation Planning Framework (ACPF) to enable practical planning applications. The ACPF comprises a planning concept, a database to facilitate field-level and watershed-scale analyses, and an ArcGIS toolbox with Python scripts to identify specific options for placement of conservation practices. This paper appends two prior publications and describes the structure of the ACPF database, which contains land use, crop history, and soils information and is available for download for 6091 HUC12 watersheds located across Iowa, Illinois, Minnesota, and parts of Kansas, Missouri, Nebraska, and Wisconsin and comprises information on 2.74 × 10 agricultural fields (available through /). Sample results examining land use trends across Iowa and Illinois are presented here to demonstrate potential uses of the database. While designed for use with the ACPF toolbox, users are welcome to use the ACPF watershed data in a variety of planning and modeling approaches. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  3. Facility planning and site development

    International Nuclear Information System (INIS)

    Reisman, R.C.; Handmaker, H.

    1986-01-01

    Planning for a magnetic resonance imaging (MRI) facility should provide for the efficient operation of current and future MRI devices and must also take into consideration a broad range of general planning principles. Control of budgeted facility costs and construction schedules is of increasing importance due to the magnitude of expense of MRI facility development as well as the need to protect institutional or entrepreneurial investment. In a competitive environment facility costs may be the determining factor in a project's success

  4. Strategic environmental assessment and national development plans in Turkey: Towards legal framework and operational procedure

    International Nuclear Information System (INIS)

    Say, Nuriye Peker; Yuecel, Muzaffer

    2006-01-01

    National development plans were started to be prepared in Turkey in 1963. These plans are mandatory for public investments and guiding principles for private investments. They have a quality which guides and sets objectives for other plans in the country. Therefore, they can be evaluated as the main reason of successes and failures of sectoral investments or the problems that they cause directly or indirectly. Turkey is undergoing rapid industrialization, urbanization and population growth, thus environmental problems are on the increase. Although Environmental Impact Assessment (EIA) has been applied to individual investments in Turkey since 1993, natural environment has continued to be affected because of human activities. Today, parallel to the developments in the world, it has been discussed that it is necessary to strengthen project-level Environmental Assessment (EA) and to practice Strategic Environmental Assessment (SEA). The interest in SEA, that is, EA at the level of proposed policies, plans and programs has grown significantly since 2000 in the country. Discussions and preparations have started about regulation which provides the legal and institutional framework for SEA in The Ministry of Environment and Forestry. However, since the scientific approach into the subject is very new in Turkey, it will take time to answer the questions about how and in what fields to practice. This research project aims at analyzing the possible practice opportunities of SEA in Turkey and the practicability of SEA into the National Five-Year Development Plan (FYDP) which is assumed at the highest level of planning hierarchy in the country. The research is conducted on two sections. In the first section, procedural approaches to SEA on national development plans are investigated and a framework for these approaches is adapted at the institutional level. In the second section, SEA form for energy sector in the development plans is developed. In this article, the findings

  5. 34 CFR 97.118 - Applications and proposals lacking definite plans for involvement of human subjects.

    Science.gov (United States)

    2010-07-01

    ... Education PROTECTION OF HUMAN SUBJECTS Federal Policy for the Protection of Human Subjects (Basic ED Policy for Protection of Human Research Subjects) § 97.118 Applications and proposals lacking definite plans..., or contracts are submitted to departments or agencies with the knowledge that subjects may be...

  6. TVET Planning and Development

    NARCIS (Netherlands)

    Dr. J. Onstenk

    2014-01-01

    There are changes in society and labour market demands made to TVET and in the TVET system itself. To deal with both types of challenges, the aim for TVET planning and development is to anticipate how employment will evolve and to determine how to give individuals a knowledge base that will enable

  7. Planning Urban Development from an Outsider’s Perspective: Siem Reap, the Backdrop of Changing Urban Representations

    Directory of Open Access Journals (Sweden)

    Adele Esposito

    2014-11-01

    Full Text Available This article explores the internationalization of urban planning in Siem Reap, the town situated as the gateway to the Archaeological Park of Angkor. After Angkor was listed as a World Heritage Site in 1992, international donors and consultants have been involved in the management of Siem Reap Province, where the archaeological park is located. Not only have they been engaged in the conservation and the enhancement of the  archaeological heritage, but they have also planned the future development of nearby Siem Reap. Foreign consultants, coming from Europe and East Asia, have tried to determine what the best suitable models and tools for the urban development of Siem Reap should be, while tourism development and foreign investments were constantly growing. No planning proposal implemented has been completely successful but, several teams of international consultants have carried out new plans that acknowledged the evolution of the urban context. In this article, I question the representation of urban space formulated by these plans and the way they were constructed by consultants coming from different cultural backgrounds and having specific objectives. The article describes how Siem Reap’s built heritage and recent urban phenomena are perceived and analyzes how internationally shared notions and principles (e.g., the discourse of “sustainable development” influence the imagination of future urban development. Faced with the failure of this series of plans, Siem Reap appears to be the backdrop to where evolving urban imagination takes place.

  8. Environment and development in Reconstruction Plans in L'Aquila territory

    Directory of Open Access Journals (Sweden)

    M. Cristina Forlani

    2013-05-01

    Full Text Available The operational engagement on the Plans for Reconstruction (earthquake 2009 could allow to propose territorial development in terms of sustainability, informed by energy considerations and the opportunity to establish new activities, related to local economies, based on the search for possible sources of renewable energy and virtuous use of water and waste cycle. In particular, the reclassification of settlements could predispose transition elements, oriented to new concepts of living, which prelude to the definition of a sustainable "city"; we specifically refer to the possibility of developing a "smart" service network and regulating the housing dimension. It lacked, so far, the involvement of the "regional policy" for the guidance and support for the configuration of administrative and financial situations, suitable for a wide participation in fund raising, beyond the mere physical reconstruction.

  9. 76 FR 31381 - Office Of New Reactors; Proposed Revision 4 to Standard Review Plan; Section 8.1 on Electric...

    Science.gov (United States)

    2011-05-31

    ... Standard Review Plan; Section 8.1 on Electric Power--Introduction AGENCY: U.S. Nuclear Regulatory...,'' on a proposed Revision 4 to Standard Review Plan (SRP), Section 8.1 on ``Electric Power--Introduction,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML111180542). The previous version of...

  10. NRC staff preliminary analysis of public comments on advance notice of proposed rulemaking on emergency planning

    International Nuclear Information System (INIS)

    Peabody, C.A.; Hickey, J.W.N.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) published an advance notice of proposed rulemaking on emergency planning on July 17, 1979 (44 FR 41483). In October and November 1979, the NRC staff submitted several papers to the Commission related to the emergency planning rulemaking. One of these papers was a preliminary analysis of public comments received on the advance notice (SECY-79-591B, November 13, 1979). This document consists of the preliminary analysis as it was submitted to the Commission, with minor editorial changes

  11. Program plan for the development of Solid Waste Storage Area 7 at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Lomenick, T.F.; Gonzales, S.; Byerly, D.W.

    1984-02-01

    The need for additional waste-burial facilities for low-level radwastes generated at Oak Ridge National Laboratory mandates development of a program to identify and evaluate an acceptable new Solid Waste Storage Area (SWSA 7). Provisions of this program include plans for identifying and evaluating SWSA 7 as well as plans for the necessary technical efforts for designing and monitoring a waste-burial facility. The development of the program plan is in accordance with general procedures issued by ORNL, and if adhered to, should meet proposed criteria and guidelines issued by such organizations as the Nuclear Regulatory Commission, the Environmental Protection Agency, the Department of Energy, and the Tennessee Department of Health. The major parts of the program include plans for (1) the acquisition of data necessary for geotechnical evaluation of a site, (2) the engineering design and construction of a facility which would be compatible with the geology and the classification and particular character of the wastes to be disposed, and (3) a monitoring system for achieving health and safety standards and environmental protection. The objective of the program, to develop SWSA 7, can only be achieved through sound management. Plans provided in this program which will ensure successful management include quality assurance, corrective measures, safety analysis, environmental impact statements, and schedule and budget

  12. Education plan

    International Nuclear Information System (INIS)

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  13. H Scan/AHP decision process planning for evaluating and ranking of proposals submitted to the DOE hydrogen program

    Energy Technology Data Exchange (ETDEWEB)

    Szoka de Valladares, M.R. [National Renwable Energy Lab., Washington, DC (United States); Mack, S. [Energtics, Washington, DC (United States)

    1995-09-01

    The DOE Hydrogen Program needs to develop criteria as part of a systematic evaluation process for proposal identification, evaluation and selection. The H Scan component of this process provides a framework in which a project proposer can fully describe their candidate technology system and its components. The H Scan complements traditional methods of capturing cost and technical information. It consists of a special set of survey forms designed to elicit information so expert reviewers can assess the proposal relative to DOE specified selection criteria. The Analytic Hierarchy Process (AHP) component of the decision process assembles the management defined evaluation and selection criteria into a coherent multi-level decision construct by which projects can be evaluated in pair-wise comparisons. The AHP model will reflect management`s objectives and it will assist in the ranking of individual projects based on the extent to which each contributes to management`s objectives. This paper contains a detailed description of the products and activities associated with the planning and evaluation process: The objectives or criteria; the H Scan; and The Analytic Hierarchy Process (AHP).

  14. Regional Development Planning in the Slovak Republic

    Science.gov (United States)

    Rentková, Katarína

    2017-10-01

    Regional development is very closely related to a region and its competitive advantages which affect the competitiveness of the region. The regional development is influenced by many factors that act differently depending on the region. To ensure the effective and harmonized regional development, the systematic approach is needed. Every region is unique and differs from the other by the level of economic development, living standards of its inhabitants, unemployment rate and by employment possibilities. Regional policy is a strategic investment policy which focuses on all regions and cities in the European Union. The aim is to boost economic growth and to improve the quality of people’s lives. Solidarity is the main feature of the policy, because policy focuses on support for less developed regions. A fundamental aspect of regional development is to reduce disparities between the regions and cities. The paper focuses on the analysis of regional development of Slovakia. The intention is to follow the logical continuity of the article’s parts, the correctness and the adequacy of information and data. First part is focused on the definition of the regional policy and regional development. Important task is to identify the differences between European policies - regional, structural and cohesion policy. This section is prepared by using the analytical methods - the analysis, the casual and historical analysis. This part is based on literature review. The empirical part is based on statistics and secondary analysis which were aimed to analyse the regional development and effectiveness of its planning in the Slovak Republic. The question of this article is whether it is possible to plan the regional development by application of the plan for economic and social development, called the Municipal Development Plan.

  15. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  16. Proposed tokamak poloidal field system development program

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, J.D.; Vogel, H.F.; Warren, R.W.; Weldon, D.M.

    1977-05-01

    A program is proposed to develop poloidal field components for TNS and EPR size tokamak devices and to test these components in realistic circuits. Emphasis is placed upon the development of the most difficult component, the superconducting ohmic-heating coil. Switches must also be developed for testing the coils, and this switching technology is to be extended to meet the requirements for the large scale tokamaks. Test facilities are discussed; power supplies, including a homopolar to drive the coils, are considered; and poloidal field systems studies are proposed.

  17. Regional manpower planning

    OpenAIRE

    G. Erens; P. Salamink; C.A. Van der Merwe CA

    2003-01-01

    Particular problems come to the fore when planning development at the regional level. These range from the complexities of the multifarious interactions between the sect oral and local components of the region to the necessity of achieving extensive participation of regional stakeholders in the planning process. In this paper a methodology for regional manpower planning is proposed. The methodology is designed to accommodate the full range of problems by applying a systems approach which is b...

  18. Practice and professional development plans (PPDPs: results of a feasibility study

    Directory of Open Access Journals (Sweden)

    Hocking Paul

    2001-03-01

    Full Text Available Abstract Background Dissatisfaction with uniprofessional education structures as a means of improving the quality of healthcare has led to proposals to develop ways of integrating professional learning and organisational development. Aims Test the feasibility of introducing practice and professional development plans using a centrally sponsored project in Wales. Design Qualitative observational study. Study sample All 541 practices in Wales were alerted to the project and invited to apply. A selection process was suggested to Health Authorities but not always efficiently conducted: 23 practices were selected and 18 participated in the process. Method Central funding was made available to health authorities. The project framework was designed by an educational department and conceptualised as the development of personal portfolios linked to one key organisation change in each practice, facilitated by external consultants who would typically hold workshops or other events. An independent researcher using non-participant observation techniques at workshops and practices undertook documentary analysis and fieldwork in four health authorities. Results Difficulties were encountered with the process of implementing the project: marketing and practice selection inconsistencies delayed the work and it was difficult to recruit practices into the project. The lack of experienced individuals to do the work and practitioner suspicion about perceived 'management' agendas were significant problems. After initial hesitancies most practices appreciated the value of developing wider ownership and commitment to proposed practice changes. Organisations found it difficult to support individual completion of the personal portfolio component of the plans. The ability to develop systems for clinical services was dependent on having already established a culture of effective teamwork in the organisation. Conclusions This work supports the view that organisational

  19. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  20. Development of a smart city planning support tool using the cooperative method

    Directory of Open Access Journals (Sweden)

    Takeshi Kobayashi

    2015-12-01

    Full Text Available A reduction of environmental burdens is currently required. In particular, proposing a new approach for the construction of a smart city using renewable energy is important. The technological development of a smart city is founded building equipment and infrastructure. However, planning methods and their techniques using the collaboration approach with residents are only just developing. This study aimed to develop a support tool for the construction of a smart city using renewable energy while facilitating consensus-building efforts among residents using the method for a cooperative housing development. We organized the supporting methods for the construction of residential area using the cooperative method. Then, we developed supporting tools that interface the computer with these methods. We examined the support techniques for the construction of a residential area using renewable energy technology by analyzing Japanese cases of a smart city. Moreover, we developed a support tool for the construction of a smart city on a trial basis. We integrated the smart city construction tools and the cooperative housing construction support tool. This tool has a 3D modeling system that helps residents to easily understand the space image as a result of the examination. We also developed a professional supporting tool that residents can consider for cost-effectiveness in renewable energy and its environmental load reduction rate for the planning of a smart city.

  1. 44 CFR 78.5 - Flood Mitigation Plan development.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...

  2. Naval Medical Research and Development Strategic Plan

    Science.gov (United States)

    2008-03-01

    the strategic planning program for action. The pros and cons of the current NMR&D organization structure, management support funding, and officer...Distribution List D-4 Naval Medical Research and Development Strategic Plan March 2008 SWE Naval Surface Warfare Enterprise SWOT Strengths

  3. Development of competences from the viewpoint of career planning

    OpenAIRE

    Adomaitienė, Jūratė; Zubrickienė, Ilona

    2011-01-01

    The paper attempts to reveal the essence of the process of career perspective planning, highlight the aspect of dynamism of modern career competence by showing the importance of its continuous development and the significance for career perspective planning. The analysis reveals the approach of teachers and lecturers towards own career competence, its development and importance for planning of own career perspective; towards reflection as the basic quality of own career development, while pla...

  4. Strategic planning for sustainable spatial, landscape and tourism development in Serbia

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2010-01-01

    Full Text Available The paper presents an overview of the expected role of spatial and environmental planning in coordination and integration with strategic planning for sustainable spatial/territorial, landscape and tourism development. The application of an integrated approach to sustainable territorial development planning and management in the European Union is also analyzed in the context of problems associated with and possibilities to enhance the European Landscape Convention and Agenda for a sustainable and competitive European tourism implementation. We have analyzed the contributions of reforms that have so far been implemented in current legislation and of planning bases to the establishment of coordinated sustainable territorial development planning and management in Serbia and to the procurement of support for the integration of sustainable tourism development and landscape planning and management into the process of spatial, environmental and sectoral planning. The approach to and problems of landscape protection and sustainable tourism development occurring in the practice in spatial planning are analyzed through examples of a new generation of spatial plans - the Spatial Plan of the Republic of Serbia, and a spatial plan of the special-purpose area for the Nature Park and Tourism Region of Stara Planina Mountain. Through the example of Mt Stara Planina, the role of strategic environmental assessment in coordination with spatial and sectoral planning is analyzed, as well as potential contribution to landscape integration and sustainable tourism development in the process of planning. The possibilities for better coordination of Serbian strategic planning in achieving the sustainable spatial and tourism development, and possibilities to integrate landscapes into the planning process are indicated.

  5. 76 FR 2135 - Office of Juvenile Justice and Delinquency Prevention Proposed Plan for Fiscal Year 2011

    Science.gov (United States)

    2011-01-12

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1544] Office of Juvenile Justice and Delinquency Prevention Proposed Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention, Office of Justice Programs, Department of Justice...

  6. Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit (631-18G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1996-07-01

    This Statement of Basis/Proposed Plan for the Gunsite 720 Rubble Pit Unit is issued by the U.S. Department of Energy, the lead agency for the Savannah River Site remedial activities, with concurrence by the U.S. Environmental Protection Agency - Region IV, and the South Carolina Department of Health and Environmental Control

  7. Neutral beam development plan

    International Nuclear Information System (INIS)

    Staten, H.S.

    1980-08-01

    The national plan is presented for developing advanced injection systems for use on upgrades of existing experiments, and use on future facilities such as ETF, to be built in the late 1980's or early 90's where power production from magnetic fusion will move closer to a reality. Not only must higher power and longer pulse length systems be developed , but they must operate reliably; they must be a tool for the experimenter, not the experiment itself. Neutral beam systems handle large amounts of energy and as such, they often are as complicated as the plasma physics experiment itself. This presents a significant challenge to the neutral beam developer

  8. Proposed plan for education and training in nonnuclear and nuclear energy technologies

    International Nuclear Information System (INIS)

    Vachon, R.I.; Griffith, D.E.

    1977-02-01

    This report presents the results of a systems approach by an ERDA/ASEE Task Force to a charge from the 94th Congress to the Energy Research and Development Administration to develop a plan for a comprehensive program for education and training in nonnuclear energy technologies. The PLAN as presented is the recommendation of the Task Force and is not to be construed as the ERDA Plan. The interpretation of the charge leads to the following definitive statements. The PLAN should consist of a program and organizational and administrative means within ERDA to develop and manage the program. The program should: (1) include general educational subprograms, vocational skill subprograms to degree and post degree programs; (2) include nuclear as well as nonnuclear education and training; (3) encourage, assist, and utilize all institutions from labor unions to universities to assure educated and trained manpower to meet the nation's energy needs; (4) be catalytic in nature and rely not only on funding as a catalytic agent but also on information and leadership; (5) give equal opportunity to all seeking or needing education and training to become a part of the energy labor market in all regions of the nation; (6) be supplementary to what can be accomplished by the private sector; (7) promote interaction between ERDA and other Federal government agencies and state and local governments; (8) be responsive as well as anticipatory; (9) be applicable from energy resource exploration to energy and use; and (10) provide for input and feedback from the private sector

  9. Our strategic plan | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Knowledge. Innovation. Solutions. IDRC's strategic plan, Investing in Solutions, will guide our efforts from 2015 to 2020. Building on more than four decades of experience, the plan reaffirms our vision to produce knowledge, support innovation, and generate solutions to improve lives and livelihoods in the developing world.

  10. Salt repository sealing materials development program: 5-year work plan

    International Nuclear Information System (INIS)

    Myers, L.B.

    1986-06-01

    This plan covers 5 years (fiscal years 1986 through 1990) of work in the repository sealing materials program to support design decisions and licensing activities for a salt repository. The plan covers a development activity, not a research activity. There are firm deliverables as the end points of each part of the work. The major deliverables are: development plans for code development and materials testing; seal system components models; seal system performance specifications; seal materials specifications; and seal materials properties ''handbook.'' The work described in this plan is divided into three general tasks as follows: mathematical modeling; materials studies (salt, cementitious materials, and earthen materials); and large-scale testing. Each of the sections presents an overview, status, planned activities, and summary of program milestones. This plan will be the starting point for preparing the development plans described above, but is subject to change if preparation of the work plan indicates that a different approach or sequence is preferable to achieve the ultimate goal, i.e., support of design and licensing

  11. Development of Comprehensive Nuclear Safety Regulation Plan for 2007-2011

    International Nuclear Information System (INIS)

    Choi, Young Sung; Kim, Woong Sik; Park, Dong Keuk; Kim, Ho Ki

    2006-01-01

    The Article 8-2 of Atomic Energy Act requires the government to establish Atomic Energy Promotion Plan every five years. It sets out national nuclear energy policies in a systematic and consistent way. The plan presents the goals and basic directions of national nuclear energy policies on the basis of current status and prospects. Both areas of utilization and safety management of nuclear energy are included and various projects and schedules are delineated based on the national policy directions. The safety management area in this plan deals with the overall safety and regulation policy. Its detail projects and schedule should be developed in separate plans by responsible ministries under the mediation of the MOST. As a regulatory authority, MOST is responsible for safety management area and its technical support organization, KINS has developed Comprehensive Nuclear Safety Regulation Plan as an implementation plan of safety area. This paper presents the development process and specific projects contained in the Comprehensive Nuclear Safety Regulation Plan which is under development now

  12. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The objective of the Hazardous Waste Development, Demonstration and Disposal (HAZWDDD) Program Plan is to ensure that the needs for treatment and disposal of all its hazardous and mixed wastes have been identified and planned for. A multifaceted approach to developing and implementing this plan is given, including complete plans for each of the five installations, and an overall integrated plan is also described in this report. The HAZWDDD Plan accomplishes the following: (1) provides background and organizational information; (2) summarizes the 402 hazardous and mixed waste streams from the five installations by grouping them into 13 general waste categories; (3) presents current treatment, storage, and disposal capabilities within Energy Systems; (4) develops a management strategy by outlining critical issues, presents flow sheets describing management schemes for problem waste streams, and builds on the needs identified; (5) outlines specific activities needed to implement the strategy developed; and (6) presents schedule and budget requirements for the next decade. The HAZWDDD Program addresses current and future technical problems and regulatory issues and uncertainties. Because of the nature and magnitude of the problems in hazardous and mixed waste management, substantial funding will be required. 10 refs., 39 figs., 16 tabs

  13. Participation in planning – A study of urban development in Norway

    Directory of Open Access Journals (Sweden)

    Eva Irene Falleth

    2011-08-01

    Full Text Available In Norway, the dominance of neo-liberal ideas has resulted in a private planning practice whereby the developer is the principal actor in opaque negotiations between planning authorities and developers. We examine patterns of contact between stakeholders in urban development planning. Based on information obtained from a survey of the 145 most populous municipalities in Norway, as well as from case studies in Oslo, Bergen and Trondheim, we find considerable interaction between the stakeholders involved in the planning process. The interaction patterns are different for civil society actors and private developers. We find that while developers have contacts with the planning authorities, the civil actors have contacts with the politicians. In the initial phase, i.e. before formal planning begins, this pattern is highly significant. Politicians frequently feel bound by negotiations and agreements that are made by the planners and the developers during the initial planning process.

  14. BEPS Hybrid Entities Proposal: A slippery slope, especially for developing countries

    NARCIS (Netherlands)

    Sanghavi, Dhruv

    2017-01-01

    Article 1(2) has been proposed in the final report on G20/OECD's Base Erosion and Profit Shifting (BEPS) Action 2. Two principle purposes of the BEPS project can be identified: First, to combat against aggressive tax planning which results in less than single taxation, and secondly, to allocate

  15. 75 FR 47619 - Notice of Availability of the Proposed California Desert Conservation Area Plan Amendment and...

    Science.gov (United States)

    2010-08-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-48668, 49502, 49503, 49504, LLCAD09000.L51010000.FX0000, LVRWB09B2400] Notice of Availability of the Proposed California Desert Conservation Area Plan Amendment and Final Environmental Impact Statement for the Ivanpah Solar Electric Generating...

  16. Forest planning at territory level: a methodological proposal

    Directory of Open Access Journals (Sweden)

    Agnoloni S

    2009-05-01

    Full Text Available This paper describes goals and methodologies of the Land Plan for Forest and Natural Environment Management Guidance (PFTI stemming from the Ri.Selv.Italia national project (within the “Forest Land Planning” 4.2 subproject. The PFTI geographic range of application is at an intermediate level between single forest-management-unit-level plan and regional forest plans, and deals with forest and pastures resources management. PFTI’s main purposes concern forest resource and forest economy analysis and assessment of the benefits that can be provided to local population through a rational forest management, taking into account also the social structure and potential local conflicts. PFTI’s final task is then to weigh up all these issues in order to give specific participated forest management guidelines at a territorial scale. Unlike the forest-management-unit-level plan, whose specific duties are predetermined and fixed, the PFTI is not necessarily a mandatory plan. On the opposite, PFTI should suggest several specific silviculture guidelines and alternative management scenarios.

  17. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    Science.gov (United States)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  18. Expanding Canada Pension Plan Retirement Benefits: Assessing Big CPP Proposals

    Directory of Open Access Journals (Sweden)

    Jonathan R. Kesselman

    2010-10-01

    Full Text Available Current and growing deficiencies in many workers’ ability to maintain their accustomed living standards in retirement have evoked varied proposals for reform of Canada’s retirement income system. This study focuses on proposals for expanding the retirement benefits of the Canada Pension Plan (CPP, and undertakes comparative analysis with proposals for reforms affecting workplace pensions and individual savings. It begins by reviewing key policy questions for the retirement income system and describing essential features of several proposals for CPP benefit expansion. It then uses these “Big CPP” proposals as a basis to assess the design issues for expanding CPP benefits and the implications for other components of the retirement income system. The paper assesses each of the major private and public savings vehicles based on multifaceted criteria for a well-performing retirement income system; a mandatory public scheme with defined benefits ranks most highly on almost all criteria other than individual flexibility. Additional behavioural and institutional factors also support the use of mandatory public pensions: myopia in savings, individual investment behaviour, scale economies and costs of fund management, adverse selection and annuitization costs, the Samaritan’s Dilemma, and labour market incentives. The study provides an overview analysis of key design issues for the expansion of CPP retirement benefits. Major issues include the desirable scale of expansion for both the percentage of insurable earnings and the insurable earnings ceiling; mandatory versus voluntary coverage and options; the allocation of investment return risk; and the phasing-in of higher premiums and benefits. The study then assesses the implications of CPP expansion for other components of the retirement income system: Old Age Security and the Guaranteed Income Supplement, workplace pensions, tax provisions for savings, and individual savings. A Big CPP fits

  19. 75 FR 80850 - Development of Strategic Plan 2011-2015

    Science.gov (United States)

    2010-12-23

    ... intended for use as LSC embarks on its planning process. LSC anticipates publishing a draft Strategic Plan... process to develop a Strategic Plan for the years 2011-2015. Toward that end, LSC is soliciting... strategic planning efforts. In addition, Among other sources, LSC is considering the guidance provided by...

  20. Workshop for development of formal MC and A plans

    International Nuclear Information System (INIS)

    Erkkila, B.H.; Hatcher, C.R.; Scott, S.C.; Thomas, K.E.

    1998-01-01

    Upgrades to both physical protection and material controls and accountability (MC and A) are progressing at many nuclear facilities in the Russian Federation. In general, Russian facilities are well prepared to address issues related to physical protection. The infrastructure to plan and implement physical protection upgrades is already in place in Russia. The infrastructure to integrate new and existing MC and A capabilities is not as well developed. The authors experience has shown that working with Russian facility management and technical personnel to draft an MC and A plan provides a way of moving MC and A upgrades forward. Los Alamos has developed a workshop for Russian nuclear facilities to facilitate the preparation of their facility MC and A plans. The workshops have been successful in bringing together facility management, safeguards specialists, and operations personnel to initiate the process of drafting these MC and A plans. The MC and A plans provide the technical basis for scheduling future MC and A upgrades at the facilities. Although facility MC and A plans are site specific, the workshop can be tailored to guide the development of an MC and A plan for any Russian nuclear site

  1. Softwareland Chronicles: A Software Development Meta-Process Proposal

    Directory of Open Access Journals (Sweden)

    Bolanos Sandro

    2016-05-01

    Full Text Available This paper presents the software development meta-process (SD-MP as a proposal to set up software projects. Within this proposal we offer conceptual elements that help solve the war of methodologies and processes in favor of an integrating viewpoint, where the main flaws associated with conventional and agile approaches are removed. Our newly developed software platform to support the meta-process is also presented together with three case studies involving projects currently in progress, where the framework proposed in SD-MP has been applied.

  2. APPLICATION OF METHODOLOGY OF STRATEGIC PLANNING IN DEVELOPING NATIONAL PROGRAMMES ON DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Inna NOVAK

    2015-07-01

    Full Text Available Actuality: The main purpose of strategic planning is that long-term interests of sustainable development of a market economy require the use of effective measures of state regulation of economic and social processes. Objective: The aim of the article is determined to analyze the development of strategic planning methodology and practical experience of its application in the design of national development programs. Methods: When writing the article the following research methods were used: analysis and synthesis, target-oriented and monographic. Results: In Ukraine at the level of state and local government authorities strategies of development of branches, regions, cities, etc. are being developed but given the lack of state funding a unified investment strategy of the country is not developed. After analyzing development of the strategic planning methodology and examples of its application in the design of state development programs we identified the need to develop an investment strategy of the state (sectors, regions, etc., as due to defined directions and guidelines of the activity it will increase the investment level in the country and ensure national strategy “Ukraine-2020”.

  3. Motivations and Barriers for Policymakers to Developing State Adaptation Plans

    Science.gov (United States)

    Miller, R.; Sylak-Glassman, E.

    2016-12-01

    Current approaches for developing high-quality adaptation plan require significant resources. In recent years, communities have grown to embrace adaptive plans across multiple forms, including adaptive capacity assessments, resilience strategies, and vulnerability assessments. Across the United States, as of this writing, 14 states have established adaptation plans, with another 8 states having begun the process. Given the high resources requirements and increasing interest in the development of adaptation plans, we aim to examine patterns behind the establishment of resilience plans at the state level. We examine demographic, financial, political, and physical characteristics associated with different states in an effort to explore the reasoning behind investing in the development of adaptation plans. This analysis considers quantitative and qualitative factors, including recent elections for political parties, politicians' climate-related statements and campaign promises, demographics, budgets, and regional climate threats. The analysis aims to identify motivations for state leadership taking action to develop adaptation plans. Results from the analysis seek to identify the primary drivers and barriers associated with state-wide resilience planning. These results could inform the design of scientific communication tools or approaches to aid future adaptation responses to climate change.

  4. Sanitation planning in developing countries

    NARCIS (Netherlands)

    Kerstens, S.M.

    2016-01-01

    Sanitation planning in developing countries: Added value of resource recovery

    Worldwide 2.5 billion people lack access to sanitation. This impacts human live, the environment and represents a loss of valuable resources that can be regained from wastewater. This study

  5. Land use planning using transit oriented development concept: Case study: Salaya station

    Science.gov (United States)

    Jarritthai, Supanee; Techpeeraparnich, Wasaporn

    2017-10-01

    The urban sprawl of Bangkok has increased with a motorization rate along with the expansion of the road network to adjacent cities. Nakhonpathom province, located at the southern edge of Bangkok has been affected by the urban sprawl. One of Nakhonpathom's Districts named "Salaya" Salaya has been quickly urbanized due to the establishment of many large academic institutes, such as universities, colleges and high schools as well as many commercial shopping malls. The period of 2013-2017, the Thai government introduced sustainable urban planning policy and promoted the use of public transportation systems. The Light Red Line railway extension of the Bangkok Metro Transit system will soon be constructed and the current Salaya Station will be replaced with new station. Many railway expansion projects will be built, should be designed by using transit-oriented development (TOD) scheme. This paper explores demographic information of the area, the demands of the community and relevant stakeholders for designing of the area using TOD. The proposed land use planning is designed based on the existing condition of the area as much as possible to meet the TOD standard and stakeholders' requirement. The result revealed that the guidelines of transit oriented development concept were of importance not only for planning of urban land use, supporting public transport, but also improving the quality of life.

  6. Personal strategic planning

    Directory of Open Access Journals (Sweden)

    Rolando Juan Soliz Estrada

    2011-01-01

    Full Text Available Reconciling personal skills with the demands of a globalized and competitive market has become a pre-requisite for professionals aspiring for success in their careers. The quest for personal fulfillment has encouraged people to search for tools which develop their talents and balance their efforts, in order to achieve a better, happier and healthier life. As an option, planning, which historically was restricted to being an organizational tool, today has also come to be used by individuals who desire personal success. In this way, the objective of this article is to develop a model of Personal Strategic Planning which takes into account the various operation areas and human performance. The proposed model is divided into: Individual Planning, Professional Planning, Family Planning, Personal Business Planning and Political Participation, Social and Religious/Spiritual Planning and their respective fields. In order to analyse and validate the model, exploratory research of a qualitative nature was used through primary and secondary data sources. From the results obtained by the model, it is possible to consider their importance to future research, once the studied areas can be developed in subsequent works.

  7. A mass merchandiser's role in enhancing pharmacy students' business plan development skills for medication therapy management services.

    Science.gov (United States)

    Moultry, Aisha Morris

    2011-09-10

    To develop a relationship between a pharmacy management course and a mass merchandiser and to determine whether involving pharmacy managers from the mass merchandiser in the course would enhance student skills in developing a business plan for medication therapy management services. The pharmacy managers from the mass merchandiser participated in lectures, provided panel discussions, and conducted a business plan competition. Learning was assessed by means of 4 examinations and 1 project (ie, the business plan). At the conclusion of the semester, surveys were administered to solicit student input and gain insight from pharmacy managers on the perceived value of this portion of the course. Students' average grade on the business plan assignment, which included the oral presentation, the peer assessment, and the written proposal, was 92.2%. Approximately 60% (n=53) of surveyed students agreed or strongly agreed that their management skills had improved because of the participation of pharmacy managers from the mass merchandiser. All of the managers enjoyed participating in the experience. The involvement of pharmacy managers from a mass merchandiser enhanced student learning in the classroom, and managers felt that their participation was an important contribution to the development of future pharmacists.

  8. The emergency plan of the ININ; El plan de emergencia del ININ

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz C, M A [ININ, Salazar, Estado de Mexico (Mexico)

    1991-07-01

    The emergency plan of the ININ, it was elaborated in 1988 and revised by the National Commission of Nuclear Safety and Safeguards (CNSNS) in 1989. At the beginning of 1990 and with the support of the IAEA it was practiced the first revision to the text of this plan, for what the proposal revision is what constitutes the development of this report.

  9. REPORTING DEVELOPMENT IN ASEAN Calls for Story Proposals

    International Development Research Centre (IDRC) Digital Library (Canada)

    little room for in-depth analysis and critical investigative study of the role and impact of ASEAN's plans for regional integration -- and its interventions on ... A key part of Canada's aid program since 1970, the International Development Research Centre (IDRC) supports research in developing countries to promote growth and ...

  10. Long-term rate orientations: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    Hydro-Quebec's preferred rate orientations for Quebec markets are presented. The background for a rate structure revision is outlined, followed by proposed changes to residential and general rates, and by a plan to implement the new rate structure. Some of the principles used in setting rates are described. The new rate structure proposals are intended to provide a better reflection of the utility's costs of supply and a clearer signal in favor of the rational use of electricity, thereby limiting long-term increases in both supply costs and electricity rates. It is proposed to use marginal costs to design rate structures, while the overall rate level will continue to reflect changes in average costs of supply. Also included in the proposed changes are time-of-use rates, which will help reduce costs by shifting loads from peak to off-peak periods and by encouraging the adoption of energy-conservation measures. Moreover, the integration of time-of-use options into the rate system will not only provide Hydro-Quebec with more powerful load-management tools but also give customers the opportunity to change their consumption patterns and thereby reduce their electricity bills. 11 figs., 11 tabs

  11. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  12. The qualitative research proposal

    Directory of Open Access Journals (Sweden)

    H Klopper

    2008-09-01

    Full Text Available Qualitative research in the health sciences has had to overcome many prejudices and a number of misunderstandings, but today qualitative research is as acceptable as quantitative research designs and is widely funded and published. Writing the proposal of a qualitative study, however, can be a challenging feat, due to the emergent nature of the qualitative research design and the description of the methodology as a process. Even today, many sub-standard proposals at post-graduate evaluation committees and application proposals to be considered for funding are still seen. This problem has led the researcher to develop a framework to guide the qualitative researcher in writing the proposal of a qualitative study based on the following research questions: (i What is the process of writing a qualitative research proposal? and (ii What does the structure and layout of a qualitative proposal look like? The purpose of this article is to discuss the process of writing the qualitative research proposal, as well as describe the structure and layout of a qualitative research proposal. The process of writing a qualitative research proposal is discussed with regards to the most important questions that need to be answered in your research proposal with consideration of the guidelines of being practical, being persuasive, making broader links, aiming for crystal clarity and planning before you write. While the structure of the qualitative research proposal is discussed with regards to the key sections of the proposal, namely the cover page, abstract, introduction, review of the literature, research problem and research questions, research purpose and objectives, research paradigm, research design, research method, ethical considerations, dissemination plan, budget and appendices.

  13. Developing "Green" Business Plans: Using Entrepreneurship to Teach Science to Business Administration Majors and Business to Biology Majors

    Science.gov (United States)

    Letovsky, Robert; Banschbach, Valerie S.

    2011-01-01

    Biology majors team with business administration majors to develop proposals for "green" enterprise for a business plan competition. The course begins with a series of student presentations so that science students learn about the fundamentals of business, and business students learn about environmental biology. Then mixed biology-business student…

  14. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  15. Planning of spatial development of tourism based on the example of spatial plan of Subotica municipality

    Directory of Open Access Journals (Sweden)

    Šećerov Velimir

    2008-01-01

    Full Text Available Planning of tourism development and its spatial disposition in Europe and world today are an important segment of the overall economic development. Having in mind its important economic and social functions, as well as its capability to intensify its other economic branches (agricultural and economic potentials, services of various types, transport and other in a certain territory, it is necessary to realize a precise valorization of tourist values in the spatial plan of municipality and to conclude at what point and at which places the tourism can represent on of development components of the entire economy of the territory to be planed. The example of the spatial plan of Subotica and main guidelines, concept and planning priorities which can be expected in the forthcoming period are presented in this paper. It is without any doubt that the municipality of Subotica with its geostrategic position, the proximity of the EU and important natural and cultural tourist potentials is a suitable space for application of contemporary principles of the tourism development planning and their correlation with other segments of integral development for the whole municipality.

  16. Leadership development and succession planning in case management.

    Science.gov (United States)

    Miodonski, Kathleen; Hines, Patricia

    2013-01-01

    The director of case management is one of health care's leadership positions most frequently in demand. The lack of qualified and effective case management leaders will continue to be an issue for organizations for years to come, influenced by increasing pressures on health care reimbursement and the aging case management workforce. Organizations have an opportunity to create a program to develop future case management leaders from their internal talent. The proposed strategies are designed for the acute care hospital but also have applicability in other health care settings where there are case managers and a need for case management leadership. The business community offers leadership research and leadership development models with relevance to case management. Identifying and developing internal talent for leadership roles has been proven to be effective in preparation for advanced responsibilities, has a positive effect on staff morale, and minimizes the impact of vacant leadership positions during recruitment and onboarding activities. Creating a case management leadership development program for an organization can be an alternative to the process of external recruitment for case management department leaders. Such a program can be undertaken even in today's budget conscious environment by accessing existing resources in an organization in a creative and organized manner. The authors outline an approach for case management leaders to accept responsibility for succession planning and for case managers to accept responsibility for promoting their own career development through creation of a leadership development program.

  17. 34 CFR 200.27 - Development of a schoolwide program plan.

    Science.gov (United States)

    2010-07-01

    ... school year. (2) The school must develop the comprehensive plan with the involvement of parents... comprehensive plan to improve teaching and learning throughout the school. (2) The school must develop the..., parents, and the public. (2) Information in the plan must be— (i) In an understandable and uniform format...

  18. Planning for Interagency Cooperation in Rural Development. CARD Report 45.

    Science.gov (United States)

    Rogers, David L.; Glick, Edward L.

    With a major emphasis on cooperative planning in rural development, three elements of development process were identified: (1) integration of units involved, occurring when several organizations contribute to a larger collective effort; (2) decentralized planning and local initiative, occurring when planning initiative is at the local level; (3)…

  19. Development planning and employment generations: achievements ...

    African Journals Online (AJOL)

    Development planning and employment generations: achievements, challenges and ... Open Access DOWNLOAD FULL TEXT ... The paper mainly utilizes secondary data through the analysis of books, journals, reports and electronic sources.

  20. Bedfordshire County Structure Plan. Proposed alterations. Results of public consultation. Policy 97: Nuclear waste

    International Nuclear Information System (INIS)

    1984-01-01

    The document refers to Alterations to the County Structure Plan, proposed by Bedfordshire County Council and submitted to the Secretary of State for the Environment. An additional Alteration initiated at the County Council's meeting, dealing with nuclear waste, had not been the subject of prior public consultation. Consultation had since been arranged, and the present document summarises the responses that have been received, and describes the next action to be taken. (U.K.)

  1. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  2. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    Science.gov (United States)

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  3. Language Planning and Development Aid: The (In)Visibility of Language in Development Aid Discourse

    Science.gov (United States)

    Taylor-Leech, Kerry; Benson, Carol

    2017-01-01

    Despite the essential role of local, regional, national and international languages in human development, there is little reference to language planning in development aid discourse. Beginning with definitions of development aid and language planning, the paper examines how the two were linked in pre- and post-colonial times, showing how language…

  4. Highlights of the SSC Site Development Plan

    International Nuclear Information System (INIS)

    Sanford, J.R.

    1991-10-01

    This paper summarizes highlights of the Site Development Plan for the Superconducting Super Collider Laboratory. The Plan, sometimes called a Master Plan, was prepared by the architectural and engineering firm for the Laboratory: Parsons Brinckerhoff/Morrison Knudsen (PB/MK) working in association with CRSS. Their task was to interpret the SSC project needs in the context of the Ellis County, Texas site. The team effort was under the direction of Lewis May from CRSS, guided by Robert Sims from the SSC Laboratory. Conceptual drawings are presented in this report

  5. Planning for Development in the Arab Gulf States: A content Analysis of Current Development Plans

    DEFF Research Database (Denmark)

    Hvidt, Martin

    2012-01-01

    Abstract: This paper analyses current development plans published by the GCC states (Bahrain, Kuwait, Oman, Qatar, Saudi Arabia, and the United Arab Emirates) in order to explore the region’s future growth trajectory: what barriers to growth are foreseen and how can they be anticipated; what...

  6. Driving change : sustainable development action plans Guidance

    OpenAIRE

    Sustainable Development Commission

    2008-01-01

    This guidance builds upon the Sustainable Development Commission’s previous guidance, Getting Started (August 2005), which set out the basic elements that the Sustainable Development Commission would expect to see in a good Sustainable Development Action Plan. Publisher PDF Original published August 2005.

  7. Development of an arid site closure plan

    International Nuclear Information System (INIS)

    Nyhan, J.W.; Barnes, F.J.

    1987-01-01

    This document describes the development of a prototype plan for the effective closure and stabilization of an arid low-level waste disposal site. This plan will provide demonstrated closure techniques for a trench in a disposal site at Los Alamos. The accuracy of modeling soil water storage by two hydrologic models, CREAMS and HELP, was tested by comparing simulation results with field measurements of soil moisture in eight experimental landfill cover systems having a range of well-defined soil profiles and vegetative covers. Regression analysis showed that CREAMS generally represented soil moisture more accurately than HELP simulations. Precautions for determining parameter values for model input and for interpreting simulation results are discussed. A specific example is presented showing how the field-validated hydrologic models can be used to develop a final prototype closure plan. 15 refs., 13 figs., 3 tabs

  8. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  9. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  10. Programmatic Environmental Assessment for Base General Plan Development, Schriever Air Force Base, Colorado

    Science.gov (United States)

    2012-06-01

    and is dominated by blue grama (Bouteloua gracilis), buffalo grass (Buchloe dactyloides), three-awned grass (Aristida purpurea), dropseed (Sporobolus...General Plan are to achieve optimal land use planning, protect the natural and human environment, and plan for future mission growth . The Proposed Action...future mission growth , and to improve environmental quality, recreation opportunities, and the safety and medical functions on Base. According to space

  11. Planning Through Incrementalism

    Science.gov (United States)

    Lasserre, Ph.

    1974-01-01

    An incremental model of decisionmaking is discussed and compared with the Comprehensive Rational Approach. A model of reconciliation between the two approaches is proposed, and examples are given in the field of economic development and educational planning. (Author/DN)

  12. Contextualising the National Development Plan for enhanced ...

    African Journals Online (AJOL)

    ... and Development. Strategy, Integrated Development Planning, enhanced service delivery .... Penderis (2012: 7) proffers that there is a vast body of ..... the various chapters, objectives and actions of the ..... financing and formulation of the ten.

  13. Municipal Development Plan, Acerra (Naples

    Directory of Open Access Journals (Sweden)

    Luigi Benevolo

    2014-02-01

    Full Text Available The Municipal Development Plan (Piano Urbanistico Comunale - PUC of Acerra has been drafted by a group of young professionals and researchers, led by Leonardo Benevolo, in accordance with the guidelines laid out by Regional Law no. 16 of 2004. Its complex drafting process was compressed into a brief, nine-month period in 2008 and 2009, at the end of which its initial adoption (or “predisposizione” – “preparation” or “predisposition” – in Italian legal terms was ratified by the municipal council. This article reconstructs the key moments, illustrating the main elements of the plan and how the debate about it took shape both inside and outside the municipal administration.

  14. Winning the Invisible War: An Agricultural Pilot Plan for Afghanistan

    National Research Council Canada - National Science Library

    Borcherdt, Edward; Carson, Austin; Kennefick, Frank; Moseley, James; Taylor, William; Ullman, Harlan; Wentz, Larry

    2008-01-01

    .... The third was to propose specific pilot plans for rejuvenating the agricultural sector. These plans were developed by experienced American farmers and other experts with long careers in government, agriculture, and development...

  15. 1989 basic plan for atomic energy development and utilization

    International Nuclear Information System (INIS)

    1989-01-01

    A Basic Plan for Atomic Energy Development and Utilization has been established each year based on the guidelines set up by the Atomic Energy Commission of Japan, with the aim of promoting the development and utilization of atomic energy schematically and efficiently. The Basic Plan shows specific projects to achieve the objectives specified in the Long-Range Plan for Atomic Energy Development and Utilization. The Basic Plan specifies efforts to be made for overall strengthening of safety measures (safety policies, safety research, disaster prevention, etc.), promotion of nuclear power generation, establishment of the nuclear fuel cycle (securing of uranium, technology for uranium enrichment, reprocessing, etc.), development of new types of power reactors (fast breeder reactor, new types of converter reactors, plutonium fuel processing technology), promotion of leading projects (nuclear fusion, utilization of radiations, atomic powered ships, high-temperature engineering tests), promotion of basic technology development (basic research, training of scientists and engineers), voluntary and active international activities (international cooperation), and acquisition of understanding and cooperation of the general public. (N,K.)

  16. Career Planning: Developing the Nation's Primary Resource.

    Science.gov (United States)

    Jarvis, Phillip S.

    Career planning is the most critical ingredient in developing a nation's primary resource, its workers. A 1988 Gallup Poll showed that 62 percent of U.S. workers had no career goal when they began their first job, and more than 50 percent felt they were in the wrong job. The same results probably could be applied to Canada. Career planning skills…

  17. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Directory of Open Access Journals (Sweden)

    Budiman Kholiq

    2018-01-01

    Full Text Available This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system

  18. Enterprise Architecture Planning in developing A planning Information System: a Case Study of Semarang State University

    Science.gov (United States)

    Budiman, Kholiq; Prahasto, Toni; Kusumawardhani, Amie

    2018-02-01

    This research has applied an integrated design and development of planning information system, which is been designed using Enterprise Architecture Planning. Frequent discrepancy between planning and realization of the budget that has been made, resulted in ineffective planning, is one of the reason for doing this research. The design using EAP aims to keep development aligned and in line with the strategic direction of the organization. In the practice, EAP is carried out in several stages of the planning initiation, identification and definition of business functions, proceeded with architectural design and EA implementation plan that has been built. In addition to the design of the Enterprise Architecture, this research carried out the implementation, and was tested by several methods of black box and white box. Black box testing method is used to test the fundamental aspects of the software, tested by two kinds of testing, first is using User Acceptance Testing and the second is using software functionality testing. White box testing method is used to test the effectiveness of the code in the software, tested using unit testing. Tests conducted using white box and black box on the integrated planning information system, is declared successful. Success in the software testing can not be ascertained if the software built has not shown any distinction from prior circumstance to the development of this integrated planning information system. For ensuring the success of this system implementation, the authors test consistency between the planning of data and the realization of prior-use of the information system, until after-use information system. This consistency test is done by reducing the time data of the planning and realization time. From the tabulated data, the planning information system that has been built reduces the difference between the planning time and the realization time, in which indicates that the planning information system can motivate the

  19. A strategic planning methodology for aircraft redesign

    Science.gov (United States)

    Romli, Fairuz Izzuddin

    Due to a progressive market shift to a customer-driven environment, the influence of engineering changes on the product's market success is becoming more prominent. This situation affects many long lead-time product industries including aircraft manufacturing. Derivative development has been the key strategy for many aircraft manufacturers to survive the competitive market and this trend is expected to continue in the future. Within this environment of design adaptation and variation, the main market advantages are often gained by the fastest aircraft manufacturers to develop and produce their range of market offerings without any costly mistakes. This realization creates an emphasis on the efficiency of the redesign process, particularly on the handling of engineering changes. However, most activities involved in the redesign process are supported either inefficiently or not at all by the current design methods and tools, primarily because they have been mostly developed to improve original product development. In view of this, the main goal of this research is to propose an aircraft redesign methodology that will act as a decision-making aid for aircraft designers in the change implementation planning of derivative developments. The proposed method, known as Strategic Planning of Engineering Changes (SPEC), combines the key elements of the product redesign planning and change management processes. Its application is aimed at reducing the redesign risks of derivative aircraft development, improving the detection of possible change effects propagation, increasing the efficiency of the change implementation planning and also reducing the costs and the time delays due to the redesign process. To address these challenges, four research areas have been identified: baseline assessment, change propagation prediction, change impact analysis and change implementation planning. Based on the established requirements for the redesign planning process, several methods and

  20. Minimum dose method for walking-path planning of nuclear facilities

    International Nuclear Information System (INIS)

    Liu, Yong-kuo; Li, Meng-kun; Xie, Chun-li; Peng, Min-jun; Wang, Shuang-yu; Chao, Nan; Liu, Zhong-kun

    2015-01-01

    Highlights: • For radiation environment, the environment model is proposed. • For the least dose walking path problem, a path-planning method is designed. • The path-planning virtual–real mixed simulation program is developed. • The program can plan walking path and simulate. - Abstract: A minimum dose method based on staff walking road network model was proposed for the walking-path planning in nuclear facilities. A virtual–reality simulation program was developed using C# programming language and Direct X engine. The simulation program was used in simulations dealing with virtual nuclear facilities. Simulation results indicated that the walking-path planning method was effective in providing safety for people walking in nuclear facilities

  1. Daybreak - a corporation plan of development and capacitation; Amanecer - un plan corporativo de desarollo y capacitacion

    Energy Technology Data Exchange (ETDEWEB)

    Pellegrini, Enzo [REPSOL Yacimientos Petroliferos Fiscales S.A. (Argentina)

    2000-07-01

    The current growth in production investments is motivating a war for talent which demands from companies a serious compromise to the recruiting of personnel as well as development and training policies that will build: technical competencies related to teamwork; high tech tools and knowledge; general training that will nourish employability in an increasingly competitive environment. Repsol YPF Group, within its Corporate Plan for Development and Training, implemented Plan Amanecer. Following is a general outline of the Plan. (author)

  2. Office of River Protection, plan for Developing Hanford Tank Waste Processing Alternatives, Revision 1, December 15, 1999

    International Nuclear Information System (INIS)

    WODRICH, D.D.

    2000-01-01

    In August 2000, The Department of Energy (DOE) must decide whether to authorize BNFL Inc. (BNFL) to construct and operate tank waste processing facilities as proposed or to take another path. This will be a multi-billion dollar commitment, requiring that the best path forward be chosen. The plan for reaching this decision is described in reference 1. The alternative evaluations in this plan are directed toward acquiring information needed for the August 2000 decision and for preparing an alternate path plan, should an acceptable agreement with BNFL not be reached. Many of the alternatives considered may still be applicable for failures that could occur after the year 2000, however, depending on the cause of later failures, others alternatives may need to be developed

  3. Budget model can aid group practice planning.

    Science.gov (United States)

    Bender, A D

    1991-12-01

    A medical practice can enhance its planning by developing a budgetary model to test effects of planning assumptions on its profitability and cash requirements. A model focusing on patient visits, payment mix, patient mix, and fee and payment schedules can help assess effects of proposed decisions. A planning model is not a substitute for planning but should complement a plan that includes mission, goals, values, strategic issues, and different outcomes.

  4. Development of 3-D Radiosurgery Planning System Using IBM Personal Computer

    International Nuclear Information System (INIS)

    Suh, Tae Suk; Park, Charn Il; Ha, Sung Whan; Kang, Wee Saing; Suh, Doug Young; Park, Sung Hun

    1993-01-01

    Recently, stereotactic radiosurgery plan is required with the information of 3-D image and dose distribution. A project has been doing if developing LINAC based stereotactic radiosurgery since April 1991. The purpose of this research is to develop 3-D radiosurgery planning system using personal computer. The procedure of this research is based on two steps. The first step is to develop 3-D localization system, which input the image information of the patient, coordinate transformation, the position and shape of target, and patient contour into computer system using CT image and stereotactic frame. The second step is to develop 3-D dose planning system, which compute dose distribution on image plane, display on high resolution monitor both isodose distribution and patient image simultaneously and develop menu-driven planning system. This prototype of radiosurgery planning system was applied recently for several clinical cases. It was shown that our planning system is fast, accurate and efficient while making it possible to handle various kinds of image modalities such as angiography, CT and MRI. It makes it possible to develop general 3-D planning system using beam eye view or CT simulation in radiation therapy in future

  5. Proposal for a strategic planning for the replacement of products in stores based on sales forecast

    Directory of Open Access Journals (Sweden)

    Cassius Tadeu Scarpin

    2011-08-01

    Full Text Available This paper presents a proposal for strategic planning for the replacement of products in stores of a supermarket network. A quantitative method for forecasting time series is used for this, the Artificial Radial Basis Neural Networks (RBFs, and also a qualitative method to interpret the forecasting results and establish limits for each product stock for each store in the network. The purpose with this strategic planning is to reduce the levels of out-of-stock products (lack of products on the shelves, as well as not to produce overstocking, in addition to increase the level of logistics service to customers. The results were highly satisfactory reducing the Distribution Center (DC to shop out-of-stock levels, in average, from 12% to about 0.7% in hypermarkets and from 15% to about 1.7% in supermarkets, thereby generating numerous competitive advantages for the company. The use of RBFs for forecasting proved to be efficient when used in conjunction with the replacement strategy proposed in this work, making effective the operational processes.

  6. A study on research and development planning of the nuclear energy

    International Nuclear Information System (INIS)

    Won, Byung Chul; Kim, Y. J.; Hong, J. J.

    2002-01-01

    In this research planning, planning object is taken as 4 projects in nuclear safety field, 2 projects in reactor and nuclear fuel field, 2 projects in basic and fundamental field among 'Mid and Long-term Nuclear R and D Program'. These projects were all carried out by KAERI and their intermediate R and D phase is closed in 2001. Major planning contents in each project contains 1) R and D's necessity and aim, 2) Technological level and depth, 3) R and D's plan, 4) R and D's results application. The planning results are summarized as follows: - Development of risk management technology - Development of optimal severe accident management strategy and engineering safety features - Development of verification and assessment technology for thermal hydraulic safety - Technology development for enhancing component and structure integrity - Proliferation-resistant fuel technology development - Liquid metal reactor design technology development - Nuclear material technology development: characterization and improvement of nuclear materials - Development of a large proton accelerator for innovative researches

  7. Development of Secondary Route Bridge Design Plan Guides

    Science.gov (United States)

    2018-03-03

    The objective of this study is to develop a set of bridge plan guides for low-volume traffic roads. The purpose of the plans is to facilitate construction of new structures suitable for local agencies. The designs are to specifically address common l...

  8. Gas development plan - Lithuania

    International Nuclear Information System (INIS)

    1993-10-01

    A detailed description of the plan for the development of gas utilization in Lithuania is presented. The plan is subdivided under the headings of gas supply, gas demand, gas transmission and distribution, economy and the organization of the gas sector in the country. The first phase of the project has been undertaken by a Danish firm in cooperation with the Lithuanian firm Lietuvos Dujos. The first aim was to clarify the problems that will arise in connection with this joint venture on developing the use of gas in Lithuania, focusing on existing gas supply and market conditions, the current flow control and metering and economic constraints. The organization of the gas sector in the country as it stands today is described and possible models for its future organization are discussed in addition to a strategy of implementation. Possible development trends are outlined and maximum/minimum demand scenarios are suggested. Subjects and areas related to the gas sector in Lithuania are identified for further investigation in the next phase. It is stated that Lithuania is at present undergoing a fast transformation towards a market economy and that the transfer of foreign currency has been liberalized. Only the pipeline from Minsk to Vilnius is open at present and provides the total supply of natural gas to Lithuania and Kalingrad, controlled by the Russian gas company, Lentransgas, on the basis of a gas purchase agreement regulated on a yearly basis. Other possible supply sources are the Danish part of the North Sea and the Norwegian offshore fields. (AB)

  9. PFP functional development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Functional Development Planning Guide presents the strategy and process used for the identification, development, and analysis of functions (activities) necessary to satisfy the requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. The functional analysis will provide the basis for the development of a function driven work breakdown structure. Future revisions to this document will include as attachments the results of the PFP Functional Analysis resulting from this approach. This document is intended be a Project-owned management tool. As such, the guide will periodically require revisions resulting from improvements of the information, processes, and techniques as now described

  10. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  11. National rf technology research and development program plan

    International Nuclear Information System (INIS)

    1983-05-01

    This plan was prepared by the Oak Ridge National Laboratory at the request of the Office of Fusion Energy, Division of Development and Technology, to define the technology development needs and priorities. The US rf research and development community, with a wide representation from universities, laboratories and industries, participated in many discussions, meetings and in a three-day workshop in developing the needs and priorities definition. This very active and effective involvement of the rf leaders from all of these groups was an essential feature of the activity and results in the plan representing a broad consensus from the magnetic fusion energy development community. In addition, a number of scientists from Japan and Europe participated by providing data

  12. Development and Reliability of the Comprehensive Crisis Plan Checklist

    Science.gov (United States)

    Aspiranti, Kathleen B.; Pelchar, Taylor K.; McCLeary, Daniel F.; Bain, Sherry K.; Foster, Lisa N.

    2011-01-01

    It is of vital importance that children are educated in a safe environment. Every school needs to have a well-developed crisis management document containing plans for prevention, intervention, and postvention. We developed the Comprehensive Crisis Plan Checklist (CCPC) to serve as a valuable tool that can be used to assist practitioners with…

  13. A Mass Merchandiser's Role in Enhancing Pharmacy Students’ Business Plan Development Skills for Medication Therapy Management Services

    Science.gov (United States)

    2011-01-01

    Objectives. To develop a relationship between a pharmacy management course and a mass merchandiser and to determine whether involving pharmacy managers from the mass merchandiser in the course would enhance student skills in developing a business plan for medication therapy management services. Design. The pharmacy managers from the mass merchandiser participated in lectures, provided panel discussions, and conducted a business plan competition. Learning was assessed by means of 4 examinations and 1 project (ie, the business plan). At the conclusion of the semester, surveys were administered to solicit student input and gain insight from pharmacy managers on the perceived value of this portion of the course. Assessment. Students’ average grade on the business plan assignment, which included the oral presentation, the peer assessment, and the written proposal, was 92.2%. Approximately 60% (n = 53) of surveyed students agreed or strongly agreed that their management skills had improved because of the participation of pharmacy managers from the mass merchandiser. All of the managers enjoyed participating in the experience. Conclusions. The involvement of pharmacy managers from a mass merchandiser enhanced student learning in the classroom, and managers felt that their participation was an important contribution to the development of future pharmacists. PMID:21969719

  14. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  15. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  16. Multi-Year SSL Market Development Support Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ledbetter, Marc R.

    2012-05-01

    This plan sets out a strategic, five year framework for guiding DOE's market development support activities for high-performance solid-state lighting (SSL) products for the U.S. general illumination market. The market development support activities described in this plan, which span federal fiscal years 2012 to 2016, are intended to affect the types of SSL general illumination products adopted by the market, to accelerate commercial adoption of those products, and to support appropriate application of those products to maximize energy savings. DOE has established aggressive FY16 goals for these activities, including goals for the types of products brought to market, the market adoption of those products, and the energy savings achieved through use of SSL products. These goals are for the combined effect of DOE's SSL market development support and R and D investment, as well as the leveraged activities of its partners. Goals include: (1) inducing the market introduction of SSL products achieving 140 lumens per Watt (lm/W) for warm white products, and 155 lm/W for cool white products, and (2) inducing sales of high-performance SSL products that achieve annual site electricity savings of 21 terawatt hours (0.25 quadrillion Btus primary energy) by FY16. To overcome identified market barriers and to achieve the above five year goals, DOE proposes to carry out the following strategy. DOE will implement a multi-year program to accelerate adoption of good quality, high performance SSL products that achieve significant energy savings and maintain or improve lighting quality. Relying on lessons learned from past emerging technology introductions, such as compact fluorescent lamps, and using newly developed market research, DOE will design its efforts to minimize the likelihood that the SSL market will repeat mistakes that greatly delayed market adoption of earlier emerging technology market introductions. To achieve the maximum effect per dollar invested, DOE will

  17. Intelligent Tools for Planning Knowledge base Development and Verification

    Science.gov (United States)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

  18. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  19. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  20. Planning Innovation and Regional Development: the Spreading of Urban Strategic Planning in Southern Italy

    OpenAIRE

    Vinci, Ignazio

    2011-01-01

    For decades the Italian system of planning has been strongly characterized by a regulatory approach and the question of cities' development had been taken into account within general land use plans. In the 1990s this approach has been considered a strong constraint on the regeneration of cities and the revitalization of their economic potential. Therefore, in the last decade the improvement of flexibility and participation within planning processes were considered primary objectives both at r...

  1. Grid planning in a competitive environment

    International Nuclear Information System (INIS)

    Quinto, J. de

    2007-01-01

    One principle that the electricity sector must fulfil is to simultaneously guarantee generation free entrance, new and old demand supply and a harmonic network development. This development is contained in the grid planning, a process assumed by a neutral institution apart from the grid or the interests of the market agents: In the case of Spain the ministry. The development of such planning, the investment to be built, are limited by the physical network and formal structure and by how the retribution is designed. In this article there is an evaluation of the problems related to develop the network planning in a competitive environment and also some proposals are suggested. (Author)

  2. Plan for gas overcrowding; Development in last decade

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    The plan for gas overcrowding, is one of the most important determinations of energy politics in last decade. It is an integral plan of consumption of combustible gas; that is to say, cover the natural gas and the liquefied gas of petroleum. In this article, the UPME wants to show the results of the implementation of this measure. The analysis shows, in the first place the impact achieved in the diversification of the energetic basket, with the penetration of the combustible gas. Facts and indicators of development of the plan are given that include an evaluation of the direct financial benefit that receive the homes, when using a more economic fuel. On the other hand, it puts on of present the government effort carried out through ECOPETROL and that of some private agents to start the plan. Finally, the investments made until today and the problems of low use of some nets of transport, related with the development of the market

  3. 76 FR 41811 - Kellaway Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, San Luis...

    Science.gov (United States)

    2011-07-15

    ...] Kellaway Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, San Luis Obispo... species in the community of Los Osos, San Luis Obispo County, California. The applicants would implement a... Los Osos, San Luis Obispo County, California. The applicants are requesting a permit for take of Morro...

  4. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  5. Internal marketing within a health care organization: developing an implementation plan.

    Science.gov (United States)

    Hallums, A

    1994-05-01

    This paper discusses how the concept of internal marketing can be applied within a health care organization. In order to achieve a market orientation an organization must identify the needs and wants of its customers and how these may change in the future. In order to achieve this, internal marketing is a necessary step to the implementation of the organizations marketing strategy. An outline plan for the introduction of an internal marketing programme within an acute hospital trust is proposed. The plan identifies those individuals and departments who should be involved in the planning and implementation of the programme. The benefits of internal marketing to the Trust are also considered.

  6. Developing a strategic human resources plan for the Urban Angel.

    Science.gov (United States)

    Owen, Susan M

    2011-01-01

    In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.

  7. National planning in South Africa: A temporal perspective

    African Journals Online (AJOL)

    and policy interventions, whether or not these relate to formal land-use planning control.” A national plan can be identified as “a government economic plan which lays down the proposed pattern of economic development (investment ... overly bureaucratic and excessively technocratic approaches to government. This article ...

  8. Writing a successful business plan: an overview.

    Science.gov (United States)

    Haag, Annette B

    2013-01-01

    In creating and building a business, the entrepreneur assumes all the responsibilities for development and management, as well as the risks and rewards. Many businesses do not survive because business owners fail to develop an effective plan. The business plan focuses on major areas of concern and their contribution to the success of a new business. The finished plan communicates the product or service to others and provides the basis for the financial proposal. Copyright 2013, SLACK Incorporated.

  9. Compact toroid development: activity plan for field reversed configurations

    International Nuclear Information System (INIS)

    1984-06-01

    This document contains the description, goals, status, plans, and approach for the investigation of the properties of a magnetic configuration for plasma confinement identified as the field reversed configuration (FRC). This component of the magnetic fusion development program has been characterized by its potential for physical compactness and a flexible range of output power. The included material represents the second phase of FRC program planning. The first was completed in February 1983, and was reported in DOE/ER-0160; Compact Toroid Development. This planning builds on that previous report and concentrates on the detailed plans for the next several years of the current DOE sponsored program. It has been deliberately restricted to the experimental and theoretical efforts possible within the present scale of effort. A third phase of this planning exercise will examine the subsequent effort and resources needed to achieve near term (1987 to 1990) FRC technical objectives

  10. Regional Development Planning in Ethiopia: Past Experience ...

    African Journals Online (AJOL)

    Regional Development Planning in Ethiopia: Past Experience, Current Initiatives and Future Prospects. ... Eastern Africa Social Science Research Review ... The main contention of the paper is that in the past, regional development, in line with the functional integration approach, was considered a national project.

  11. 76 FR 78942 - Draft Environmental Impact Statement and Proposed Vernal Pool Habitat Conservation Plan for the...

    Science.gov (United States)

    2011-12-20

    ... activities associated with urban development activities. We also announce plans for a public scoping meeting... planning area and their possible impacts on the species; 5. The presence of archeological sites, buildings...

  12. Developing cancer control plans in Africa: examples from five countries.

    Science.gov (United States)

    Stefan, Daniela Cristina; Elzawawy, Ahmed M; Khaled, Hussein M; Ntaganda, Fabien; Asiimwe, Anita; Addai, Beatrice Wiafe; Wiafe, Seth; Adewole, Isaac F

    2013-04-01

    The creation and implementation of national cancer control plans is becoming increasingly necessary for countries in Africa, with the number of new cancer cases per year in the continent expected to reach up to 1·5 million by 2020. Examples from South Africa, Egypt, Nigeria, Ghana, and Rwanda describe the state of national cancer control plans and their implementation. Whereas in Rwanda the emphasis is on development of basic facilities needed for cancer care, in those countries with more developed economies, such as South Africa and Nigeria, the political will to fund national cancer control plans is limited, even though the plans exist and are otherwise well conceived. Improved awareness of the increasing burden of cancer and increased advocacy are needed to put pressure on governments to develop, fund, and implement national cancer control plans across the continent. Copyright © 2013 Elsevier Ltd. All rights reserved.

  13. Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan

    Science.gov (United States)

    1988-01-01

    An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.

  14. Plan Repair as an Extension of Planning

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    In dynamic environments, agents have to deal with changing situations. In these cases, repairing a plan is often more efficient than planning from scratch, but existing planning techniques are more advanced than existing plan repair techniques. Therefore, we propose a straightforward method to

  15. Career planning and development for nurses: the time has come.

    Science.gov (United States)

    Donner, G J; Wheeler, M M

    2001-06-01

    Developments in how the nursing profession is perceived by nurses and by society, along with unparalleled changes in health care systems, have created an environment in which individual nurses must take control of their careers and futures. Educators, employers and professional organizations also have a key role to play in fostering the career planning and development of nurses, usually the largest employee group in most health care organizations. This article provides an overview of what career planning and development is and why it is important for nurses. A career planning and development model is described that provides nurses with a focused strategy to take greater responsibility for engaging in the ongoing planning process that is crucial throughout the major stages of their career. Finally, educators, employers and professional organizations are challenged to collaborate with individual nurses on career-development activities that will enable nurses to continue to provide high-quality care in ever-changing health care systems.

  16. Selected Economic Aspects Of Adopting A Local Spatial Development Plan Exemplified By The Commune Of Tomice In Malopolskie Province

    Directory of Open Access Journals (Sweden)

    Gawroński Krzysztof

    2015-12-01

    Full Text Available The object of this article is to analyze and asses the legal and economic consequences arising from the adoption (or change of a local spatial development plan. The paper also presents, based on the example of the rural commune of Tomice in the Malopolska Province of Poland, how to estimate income to the commune budget from the collected planning fees. The analyses are based on planning studies, including the local spatial development plan from 2004, and the study of conditions and directions of spatial development from 2012. The council of Tomice Commune adopted the local spatial plan due to the increasing demand for residential areas. According to the plan, over 930 acres of land have been allocated for investment purposes, which is approx. 22.4% of the total area of 4,155 ha. The local plan was developed for all the six cadastral units of the commune, with one hundred percent surface coverage. The physiographic conditions and the location of Tomice Commune encourage the settlement of the urban population (from Wadowice or Krakow, which entails the need for housing investment areas. In 2012, the Tomice Commune adopted a change in the study of conditions and directions of spatial development. The proposed re-zoning of the area is in line with the policy of transitioning from an agricultural character towards the sustainable and multifunctional development of the commune. It is worth noting that the provisions of the plan of 2004 take into account the collection of a one-time fee for the sale of real estate whose value has increased as a result of the adoption of the plan. The amount of this fee for investment areas was set at the level of 30% of the increase in value, in accordance with the provisions of the Polish Act on Spatial Planning and Management. Due to the fact that the currently valid local plan has been in effect for 10 years, it can be assumed that the commune will proceed to make some changes to it. The article estimates the

  17. Strategic Plan for Light Water Reactor Research and Development

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this strategic plan is to establish a framework that will allow the Department of Energy (DOE) and the nuclear power industry to jointly plan the nuclear energy research and development (R and D) agenda important to achieving the Nation's energy goals. This strategic plan has been developed to focus on only those R and D areas that will benefit from a coordinated government/industry effort. Specifically, this plan focuses on safely sustaining and expanding the electricity output from currently operating nuclear power plants and expanding nuclear capacity through the deployment of new plants. By focusing on R and D at addresses the needs of both current and future nuclear plants, DOE and industry will be able to take advantage of the synergism between these two technology areas, thus improving coordination, enhancing efficiency, and further leveraging public and private sector resources. By working together under the framework of this strategic plan, DOE and the nuclear industry reinforce their joint commitment to the future use of nuclear power and the National Energy Policy's goal of expanding its use in the United States. The undersigned believe that a public-private partnership approach is the most efficient and effective way to develop and transfer new technologies to the marketplace to achieve this goal. This Strategic Plan is intended to be a living document that will be updated annually

  18. Environmental Development Plan: uranium mining, milling, and conversion

    International Nuclear Information System (INIS)

    1979-08-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety (EH and S) aspects of the uranium mining, milling, and conversion technologies. The plan represents the collective perceptions of EH and S concerns and requirements and knowledge of ongoing research programs of most of the Federal agencies involved in significant EH and S R and D program management, standards setting, or regulatory activities associated with uranium mining, milling, and conversion

  19. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    International Nuclear Information System (INIS)

    King, D.A.

    1994-01-01

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan

  20. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    1987-08-01

    This report was prepared to illustrate the policy and actions that the State of Nevada believe are required to assure that the quality of the environment is adequately considered during the course of the DOE work at the proposed high-level nuclear waste repository at Yucca Mountain. The report describes the DOE environmental program and the studies planned by NWPO to reflect the State's position toward environmental protection. 41 refs., 2 figs., 11 tabs

  1. Planning Cultures and Histories: Influences on the Evolution of Planning Systems and Spatial Development Patterns

    NARCIS (Netherlands)

    Stead, D.; de Vries, J.; Tasan-Kok, T.

    2015-01-01

    This special issue addresses the influences of planning cultures and histories on the evolution of planning systems and spatial development. As well as providing an international comparative perspective on these issues, the collection of articles also engages in a search for new conceptual

  2. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  3. Manpower development - planning and implementation

    International Nuclear Information System (INIS)

    Scholten, V.W.

    1978-01-01

    The demands of a nuclear technology programme on the manpower resources of a developing country are very onerous. Unlike other industries, as well as the planning and operating staff, nuclear technology requires an additional administrative infrastructure to regulate the various activities. To minimize the effect of manpower shortage, the planning and development of manpower resources need to be carried out on a national scale. To introduce a nuclear programme, a special preparatory phase is required. During this phase the special conditions appertaining to the country are first considered, as are the evaluation and then the promotional aspects of the programme. In a second phase, all the partners involved in the implementation are considered, with reference to their roles and interrelationships. Their various tasks and obligations are fully assessed. This is a wide-ranging study covering, in addition to the construction of a nuclear power plant, the industrial collaboration and licensing agreements, and the utility operational training schemes. Finally, the third phase considers the different and necessary educational requirements, and the existent and developed level of the manpower, with respect to the scope and content of the know-how transfer. When all the relevant aspects have been considered, the expansion of the universities and educational establishments must be carried out. This whole phase needs to be started as early as possible because it involves a period of some years. (author)

  4. Crown and crown-root fractures: an evaluation of the treatment plans for management proposed by 154 specialists in restorative dentistry.

    Science.gov (United States)

    de Castro, Mara Antonio Monteiro; Poi, Wilson Roberto; de Castro, José Carlos Monteiro; Panzarini, Sônia Regina; Sonoda, Celso Koogi; Trevisan, Carolina Lunardelli; Luvizuto, Eloá Rodrigues

    2010-06-01

    Traumatic tooth injuries involve function and aesthetics and cause damage that range from minimal enamel loss to complex fractures involving the pulp tissue and even loss of the tooth crown. Technical knowledge and clinical experience are essential to establish an accurate diagnosis and provide a rational treatment. The purpose of this study was to evaluate the knowledge of Restorative Dentistry specialists about the management of crown and crown-root fractures based on treatment plans proposed by these professionals for these cases. A descriptive questionnaire was mailed to 245 Restorative Dentistry specialists with questions referring to their professional profile and the treatment plans they would propose for the management of crown and crow-root fractures resulting from dental trauma. One hundred and fifty-four questionnaires were returned properly filled. The data were subjected to descriptive statistics and the chi-square test was used to determine the frequency and the level of the significance among the variables. The analysis of data showed that in spite of having a specialist title, all interviewees had great difficulty in planning the treatments. As much as 42.8% of the participants were unable to treat all types of dental trauma. Complicated and uncomplicated crown-root fractures posed the greatest difficulties for the dentists to establish adequate treatment plans because these fractures require multidisciplinary knowledge and approach for a correct case planning and prognosis.

  5. Diverting the tourists: a spatial decision-support system for tourism planning on a developing island

    Science.gov (United States)

    Beedasy, Jaishree; Whyatt, Duncan

    Mauritius is a small island (1865 km 2) in the Indian Ocean. Tourism is the third largest economic sector of the country, after manufacturing and agriculture. A limitation of space and the island's vulnerable ecosystem warrants a rational approach to tourism development. The main problems so far have been to manipulate and integrate all the factors affecting tourism planning and to match spatial data with their relevant attributes. A Spatial Decision Support System (SDSS) for sustainable tourism planning is therefore proposed. The proposed SDSS design would include a GIS as its core component. A first GIS model has already been constructed with available data. Supporting decision-making in a spatial context is implicit in the use of GIS. However the analytical capability of the GIS has to be enhanced to solve semi-structured problems, where subjective judgements come into play. The second part of the paper deals with the choice, implementation and customisation of a relevant model to develop a specialised SDSS. Different types of models and techniques are discussed, in particular a comparison of compensatory and non-compensatory approaches to multicriteria evaluation (MCE). It is concluded that compensatory multicriteria evaluation techniques increase the scope of the present GIS model as a decision-support tool. This approach gives the user or decision-maker the flexibility to change the importance of each criterion depending on relevant objectives.

  6. Designing a strategic plan development approach for integrated area development projects

    NARCIS (Netherlands)

    de Kort, Inge

    2009-01-01

    Increasingly, it has become evident that spatial problems can no longer be resolved in isolation, but should be solved in conjunction with other development-related issues. Interest in integrated area development is growing, and a more integrated planning approach is desired. In this design-based

  7. Inverse planning and class solutions for brachytherapy treatment planning

    International Nuclear Information System (INIS)

    Trnkova, P.

    2010-01-01

    Brachytherapy or interventional radiooncology is a method of radiation therapy. It is a method, where a small encapsulated radioactive source is placed near to / in the tumour and therefore delivers high doses directly to the target volume. Organs at risk (OARs) are spared due to the inverse square dose fall-off. In the past years there was a slight stagnation in the development of techniques for brachytherapy treatment. While external beam radiotherapy became more and more sophisticated, in brachytherapy traditional methods have been still used. Recently, 3D imaging was considered also as the modality for brachytherapy and more precise brachytherapy could expand. Nowadays, an image guided brachytherapy is state-of-art in many centres. Integration of imaging methods lead to the dose distribution individually tailored for each patient. Treatment plan optimization is mostly performed manually as an adaptation of a standard loading pattern. Recently, inverse planning approaches have been introduced into brachytherapy. The aim of this doctoral thesis was to analyze inverse planning and to develop concepts how to integrate inverse planning into cervical cancer brachytherapy. First part of the thesis analyzes the Hybrid Inverse treatment Planning and Optimization (HIPO) algorithm and proposes a workflow how to safely work with this algorithm. The problem of inverse planning generally is that only the dose and volume parameters are taken into account and spatial dose distribution is neglected. This fact can lead to unwanted high dose regions in a normal tissue. A unique implementation of HIPO into the treatment planning system using additional features enabled to create treatment plans similar to the plans resulting from manual optimization and to shape the high dose regions inside the CTV. In the second part the HIPO algorithm is compared to the Inverse Planning Simulated Annealing (IPSA) algorithm. IPSA is implemented into the commercial treatment planning system. It

  8. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  9. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  10. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  11. Development of Web-Based Menu Planning Support System and its Solution Using Genetic Algorithm

    Science.gov (United States)

    Kashima, Tomoko; Matsumoto, Shimpei; Ishii, Hiroaki

    2009-10-01

    Recently lifestyle-related diseases have become an object of public concern, while at the same time people are being more health conscious. As an essential factor for causing the lifestyle-related diseases, we assume that the knowledge circulation on dietary habits is still insufficient. This paper focuses on everyday meals close to our life and proposes a well-balanced menu planning system as a preventive measure of lifestyle-related diseases. The system is developed by using a Web-based frontend and it provides multi-user services and menu information sharing capabilities like social networking services (SNS). The system is implemented on a Web server running Apache (HTTP server software), MySQL (database management system), and PHP (scripting language for dynamic Web pages). For the menu planning, a genetic algorithm is applied by understanding this problem as multidimensional 0-1 integer programming.

  12. 78 FR 35951 - Proposed Low-Effect Habitat Conservation Plan for the City of Santa Cruz Graham Hill Water...

    Science.gov (United States)

    2013-06-14

    ...] Proposed Low-Effect Habitat Conservation Plan for the City of Santa Cruz Graham Hill Water Treatment Plant... grasshopper (Trimerotropis infantilis), and will address associated impacts and conservation measures for the... lawful activities associated with the operation and maintenance of the existing Graham Hill Water...

  13. Development of Consensus Treatment Plans for Juvenile Localized Scleroderma

    Science.gov (United States)

    Li, Suzanne C.; Torok, Kathryn S.; Pope, Elena; Dedeoglu, Fatma; Hong, Sandy; Jacobe, Heidi T.; Rabinovich, C. Egla; Laxer, Ronald M.; Higgins, Gloria C.; Ferguson, Polly J.; Lasky, Andrew; Baszis, Kevin; Becker, Mara; Campillo, Sarah; Cartwright, Victoria; Cidon, Michael; Inman, Christi J; Jerath, Rita; O'Neil, Kathleen M.; Vora, Sheetal; Zeft, Andrew; Wallace, Carol A.; Ilowite, Norman T.; Fuhlbrigge, Robert C

    2013-01-01

    Objective To develop standardized treatment plans, clinical assessments, and response criteria for active, moderate to high severity juvenile localized scleroderma (jLS). Background jLS is a chronic inflammatory skin disorder associated with substantial morbidity and disability. Although a wide range of therapeutic strategies have been reported in the literature, a lack of agreement on treatment specifics and accepted methods for clinical assessment of have made it difficult to compare approaches and identify optimal therapy. Methods A core group of pediatric rheumatologists, dermatologists and a lay advisor was engaged by the Childhood Arthritis and Rheumatology Research Alliance (CARRA) to develop standardized treatment plans and assessment parameters for jLS using consensus methods/nominal group techniques. Recommendations were validated in two face-to-face conferences with a larger group of practitioners with expertise in jLS and with the full membership of CARRA, which encompasses the majority of pediatric rheumatologists in the U.S and Canada. Results Consensus was achieved on standardized treatment plans that reflect the prevailing treatment practices of CARRA members. Standardized clinical assessment methods and provisional treatment response criteria were also developed. Greater than 90% of pediatric rheumatologists responding to a survey (67% of CARRA membership) affirmed the final recommendations and agreed to utilize these consensus plans to treat patients with jLS. Conclusions Using consensus methodology, we have developed standardized treatment plans and assessment methods for jLS. The high level of support among pediatric rheumatologists will support future comparative effectiveness studies and enable the development of evidence-based guidelines for the treatment of jLS. PMID:22505322

  14. Geospatial Based Information System Development in Public Administration for Sustainable Development and Planning in Urban Environment

    Science.gov (United States)

    Kouziokas, Georgios N.

    2016-09-01

    It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.

  15. EMI Architecture and Technology Development Plan

    CERN Document Server

    Balazs, K.

    2013-01-01

    This document provides a brief overview of the EMI architecture and the technology development directions presented by the four EMI technology areas and by EMI partners. The report represents the final revision of EMI technology planning covering a time period beyond the project end.

  16. Decentralized Development Planning and Fragmentation of ...

    African Journals Online (AJOL)

    Using the Greater Accra Metropolitan Area (GAMA) as a case study, this paper argues that the proliferation of autonomous local government areas within the context of urban sprawl and other challenges have inhibited metropolitan-wide development planning. Keywords: Decentralization; local government; urban growth; ...

  17. General Electric Company proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-04-01

    The general requirements and methods for instrumenting, testing, and evaluating solar HVAC systems forming a part of ERDA's ''Commercial Demonstration Program'' commensurate with ERDA 23A and the Proposed Management Plan 75SDS4270 are defined. Design requirements are specified for the performance of components and subsystems comprising the instrumentation and data gathering system, as well as the support functions required to perform the diagnostic measurements, collection and processing of data, and documentation of reports on solar HVAC system performance, including economic and societal evaluations.

  18. Statement of Basis/Proposed Plan for the P-Area Burning Rubble Pit (131-P)

    International Nuclear Information System (INIS)

    Bland, T.

    2002-01-01

    The Statement of Basis/Proposed Plan (SB/PP) is being issued by the United States Department of Energy (USDOE), which functions as the lead agency for Savannah River Site (SRS) remedial activities, with concurrence by the United States Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this SB/PP is to describe the preferred remedial alternatives for the P-Area Burning/Rubble Pit (131-P) (PBRP) Operable Unit (OU) and to provide for public involvement in the decision-making process

  19. Regional planning and urban infrastructure development in the ...

    African Journals Online (AJOL)

    Regional planning and urban infrastructure development in the Gongola region, ... PROMOTING ACCESS TO AFRICAN RESEARCH ... In North-eastern Nigeria, the Gongola region has been one of the least developed since independence.

  20. En Route Descent Advisor Multi-Sector Planning Using Active and Provisional Controller Plans

    Science.gov (United States)

    Vivona, Robert; Green, Steven

    2003-01-01

    As decision support tools are developed to support controllers in complex air traffic control environments, new approaches to maintaining situation awareness and managing traffic planning must be developed to handle the ever-increasing amounts of alerting and advisory data. Within high-density metering and other environments where flight path changes are the rule, not the exception, and where interactions between these changes are required, current trial planning approaches are limited by potential increases in workload. The Enroute Descent Advisor (EDA) is a set of decision support tool capabilities for managing high-density en route traffic subject to metering restrictions. The EDA system s novel approach builds aircraft plans from combinations of user intent data and builds controller plans from combinations of aircraft plans to effectively maintain situation awareness during traffic planning. By maintaining both active (current) and provisional (proposed) controller plans, EDA supports controllers in coordinated traffic planning both within and between sectors. Ultimately, EDA s multi-sector planning approach will facilitate a transition from current sector-oriented operations to a new trajectory-oriented paradigm, enabling new levels of efficiency and collaboration in air traffic control.

  1. Statistical methods for the planning of inspections

    International Nuclear Information System (INIS)

    Hough, C.G.; Beetle, T.M.

    1976-01-01

    Inspection plans are designed to detect diversions of M kilograms of nuclear material with a high degree of confidence. Attribute sample plans were first developed and applied at a zero-energy fast reactor in the United Kingdom in co-operation with the Agency. Battelle-Northwest in the United States of America proposed a variables sample plan based on decision theory. The Karlsruhe Research Center in the Federal Republic of Germany developed the strategic points concept and sample plans based on game theory considerations. All these approaches were combined into a common approach which is summarized in this report. (author)

  2. LAND USE PLANNING AND URBAN PLANS: TERRITORIAL BALANCE AS ETHICS

    Directory of Open Access Journals (Sweden)

    Eunice Helena Sguizzardi Abascal

    2012-07-01

    Full Text Available The article suggests a necessary link between urban planning and territorial organization, in order to, through the synergistic relationship between planning tools and their application to planning, implementing a policy of urban and regional management. By linking the development plan for territorial development plans and categories of land use, this methodology helps to streamline operations at multiple scales. The establishment of this network of instruments and shapes the actions of government action against the rapid and intense increase of only economic forces that shape the territory today, suggesting that it is possible to regulate the action of the housing market through planned interventions, valuing the regional balance, social and environmental - ethical by definition. It is suggested that the possible effects predatory natural and built environment can be reversed or prevented by an action articulating these planning instruments are linked to the development and implementation of plans (and projects at multiple scales, approaching from the regional to the local and metropolitan, from regional policies to sectors, that are incidents in the municipal territory. However, the speed and magnitude of the occupation and transformation of soil occur mainly in periods of heating housing, often jeopardize the balance and environmental quality, natural heritage, urban and landscape. It assumes the argument that the overcoming of undesirable environmental effects, triggered by occupation of the ground guided by the real estate sector fast action can be successful with the articulation of levels of planning and intervention. It is proposed that the complexity of contemporary urban and metropolitan requires the articulation of different scales through the use of innovative urban instruments. By articulating these different scales, at the municipal and other levels supra, contributes to, through a network plan to overcome the undesirable dichotomy

  3. Proposed Development of NASA Glenn Research Center's Aeronautical Network Research Simulator

    Science.gov (United States)

    Nguyen, Thanh C.; Kerczewski, Robert J.; Wargo, Chris A.; Kocin, Michael J.; Garcia, Manuel L.

    2004-01-01

    Accurate knowledge and understanding of data link traffic loads that will have an impact on the underlying communications infrastructure within the National Airspace System (NAS) is of paramount importance for planning, development and fielding of future airborne and ground-based communications systems. Attempting to better understand this impact, NASA Glenn Research Center (GRC), through its contractor Computer Networks & Software, Inc. (CNS, Inc.), has developed an emulation and test facility known as the Virtual Aircraft and Controller (VAC) to study data link interactions and the capacity of the NAS to support Controller Pilot Data Link Communications (CPDLC) traffic. The drawback of the current VAC test bed is that it does not allow the test personnel and researchers to present a real world RF environment to a complex airborne or ground system. Fortunately, the United States Air Force and Navy Avionics Test Commands, through its contractor ViaSat, Inc., have developed the Joint Communications Simulator (JCS) to provide communications band test and simulation capability for the RF spectrum through 18 GHz including Communications, Navigation, and Identification and Surveillance functions. In this paper, we are proposing the development of a new and robust test bed that will leverage on the existing NASA GRC's VAC and the Air Force and Navy Commands JCS systems capabilities and functionalities. The proposed NASA Glenn Research Center's Aeronautical Networks Research Simulator (ANRS) will combine current Air Traffic Control applications and physical RF stimulation into an integrated system capable of emulating data transmission behaviors including propagation delay, physical protocol delay, transmission failure and channel interference. The ANRS will provide a simulation/stimulation tool and test bed environment that allow the researcher to predict the performance of various aeronautical network protocol standards and their associated waveforms under varying

  4. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    Science.gov (United States)

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  5. Solution Proposals for Japan-Oriented Offshore Software Development in China

    Science.gov (United States)

    Zhang, Lei; Zhang, Xuan; Chai, Meiping; Tan, Yibing; Miyake, Shigeru; Taniguchi, Yoji; Hosoya, Jun; Mibe, Ryota

    Surveys on the Japan-oriented vendors in China were conducted twice to find out the existent problems in the Japan-oriented offshore software development. From these survey results, four main problems were found out, which were the frequent requirement changes from the product owner, the misunderstanding of the requirement specification in the vendor side, the heavy overhead of the project management and the low-efficiency communication between the product owner and the vendor. Several solutions are proposed to solve these four problems, which mainly consist of the improvement of the offshore software development process and the development of the offshore development supporting tools. The proposed offshore development process is based on the application of the prototype development, the iteration development and the customer test driven development processes. The proposed offshore development supporting tools include the project management assistant tool and the communication assistant tool.

  6. Evaluation and development plan of NRTA measurement methods for the Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Li, T.K.; Hakkila, E.A.; Flosterbuer, S.F.

    1995-01-01

    Near-real-time accounting (NRTA) has been proposed as a safeguards method at the Rokkasho Reprocessing Plant (RRP), a large-scale commercial boiling water and pressurized water reactors spent-fuel reprocessing facility. NRTA for RRP requires material balance closures every month. To develop a more effective and practical NRTA system for RRP, we have evaluated NRTA measurement techniques and systems that might be implemented in both the main process and the co-denitration process areas at RRP to analyze the concentrations of plutonium in solutions and mixed oxide powder. Based on the comparative evaluation, including performance, reliability, design criteria, operation methods, maintenance requirements, and estimated costs for each possible measurement method, recommendations for development were formulated. This paper discusses the evaluations and reports on the recommendation of the NRTA development plan for potential implementation at RRP

  7. 2016 Fermilab Laboratory Directed Research & Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2016-05-25

    Fermilab is executing Laboratory Directed Research and Development (LDRD) as outlined by order DOE O 413.2B in order to enhance and realize the mission of the laboratory in a manner that also supports the laboratory’s strategic objectives and the mission of the Department of Energy. LDRD funds enable scientific creativity, allow for exploration of “high risk, high payoff” research, and allow for the demonstration of new ideas, technical concepts, and devices. LDRD also has an objective of maintaining and enhancing the scientific and technical vitality of Fermilab. LDRD is able to fund employee-initiated proposals that address the current strategic objectives and better position Fermilab for future mission needs. The request for such funds is made in consideration of the investment needs, affordability, and directives from DOE and Congress. Review procedures of the proposals will insure that those proposals which most address the strategic goals of the DOE and the Laboratory or which best position Fermilab for the future will be recommended to the Laboratory Director who has responsibility for approval. The execution of each approved project will be the responsibility of the Principal Investigator, PI, who will follow existing Laboratory guidelines to ensure compliance with safety, environmental, and quality assurance practices. A Laboratory Director-appointed LDRD Coordinator will work with Committees, Laboratory Management, other Fermilab Staff, and the PI’s to oversee the implementation of policies and procedures of LDRD and provide the management and execution of this Annual Program Plan. FY16 represents third fiscal year in which LDRD has existed at Fermilab. The number of preliminary proposals (117) submitted in response to the LDRD Call for Proposals indicates very strong interest of the program within the Fermilab community. The first two Calls have resulted in thirteen active LDRD projects – and it is expected that between five and seven new

  8. Research and development plan for the Slagging Pyrolysis Incinerator

    International Nuclear Information System (INIS)

    Hedahl, T.G.; McCormack, M.D.

    1979-01-01

    Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance

  9. 78 FR 26616 - Draft NOAA Five Year Research and Development Plan

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF COMMERCE Draft NOAA Five Year Research and Development Plan AGENCY: National Oceanic and Atmospheric Administration (NOAA), Department of Commerce (DOC). ACTION: Draft NOAA Five Year Research and Development Plan for Public Review. SUMMARY: NOAA's draft Five Year Research and Development...

  10. Study on DSM-based task planning of product cooperative development

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    The results of analyzing the managerial characteristics and complexity of product cooperative development suggest that task planning is an important aspect for process management of product cooperative development and the method for planning tasks should be able to model the dependency between tasks and iterations during the development process. In this paper, a DSM-based method and its corresponding optimization algorithms are developed. At first the coupled task sets and uncoupled task sets are identified...

  11. Evidence development and publication planning: strategic process.

    Science.gov (United States)

    Wittek, Michael R; Jo Williams, Mary; Carlson, Angeline M

    2009-11-01

    A number of decisions in the health care field rely heavily on published clinical evidence. A systematic approach to evidence development and publication planning is required to develop a portfolio of evidence that includes at minimum information on efficacy, safety, durability of effect, quality of life, and economic outcomes. The approach requires a critical assessment of available literature, identification of gaps in the literature, and a strategic plan to fill the gaps to ensure the availability of evidence demanded for clinical decisions, coverage/payment decisions and health technology assessments. The purpose of this manuscript is to offer a six-step strategic process leading to a portfolio of evidence that meets the informational needs of providers, payers, and governmental agencies concerning patient access to a therapy.

  12. Analysing contemporary metropolitan spatial plans in Europe through their institutional context, instrumental content and planning process

    DEFF Research Database (Denmark)

    Elinbaum, Pablo; Galland, Daniel

    2016-01-01

    This article sets out to propose and apply a qualitative framework for thinking about how to analyze and compare metropolitan spatial plans in a milieu of divergent spatial planning traditions and discretionary planning practices. In doing so, the article reviews and develops an understanding...... concerning the institutional context, instrumental content and planning processes associated with four contemporary metropolitan spatial plans in Europe, namely London, Copenhagen, Paris and Barcelona. Through the results of a multiple case study and a subsequent cross comparative analysis, the article...... stresses that contemporary metropolitan spatial plans tend to merge characteristics associated with project-based and strategy-based spatial plans, thus contrasting with the typical land-use character of municipal plans and the often strategic, growth-oriented pursuit of regional plans in Europe...

  13. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) program plan: Executive summary

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan provides a strategy for management of hazardous and mixed wastes generated by the five Department of Energy (DOE) installations managed by Martin Marietta Energy Systems, Inc. (Energy Systems). This integrated corporate plan is based on the individual installation plans, which identify waste streams, facility capabilities, problem wastes, future needs, and funding needs. Using this information, the corporate plan identifies common concerns and technology/facility needs over the next 10 years. The overall objective of this corporate plan is to ensure that treatment, storage, and disposal (TSD) needs for all hazardous and mixed wastes generated by Energy Systems installations have been identified and planned for. Specific objectives of the program plan are to (1) identify all hazardous and mixed waste streams; (2) identify hazardous and mixed waste TSD requirements; (3) identify any unresolved technical issues preventing implementation of the strategy; (4) develop schedules for studies, demonstrations, and facilities to resolve the issues; and (5) define the interfaces with the Low-Level Waste Disposal Development and Demonstration (LLWDDD) Program. 10 refs., 7 figs

  14. 2016 Federal Cybersecurity Research and Development Strategic Plan

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — As part of the Presidents Cybersecurity National Action Plan (CNAP), the Administration released the 2016 Federal Cybersecurity Research and Development Strategic...

  15. Health workforce development planning in the Sultanate of Oman: a case study

    Directory of Open Access Journals (Sweden)

    Ghosh Basu

    2009-06-01

    Full Text Available Abstract Introduction Oman's recent experience in health workforce development may be viewed against the backdrop of the situation just three or four decades ago, when it had just a few physicians and nurses (mostly expatriate. All workforce categories in Oman have grown substantially over the last two decades. Increased self-reliance was achieved despite substantial growth in workforce stocks. Stocks of physicians and nurses grew significantly during 1985–2007. This development was the outcome of well-considered national policies and plans. This case outlines how Oman is continuing to turn around its excessive dependence on expatriate workforce through strategic workforce development planning. Case description The Sultanate's early development initiatives focused on building a strong health care infrastructure by importing workforce. However, the policy-makers stressed national workforce development for a sustainable future. Beginning with the formulation of a strategic health workforce development plan in 1991, the stage was set for adopting workforce planning as an essential strategy for sustainable health development and workforce self-reliance. Oman continued to develop its educational infrastructure, and began to produce as much workforce as possible, in order to meet health care demands and achieve workforce self-reliance. Other policy initiatives with a beneficial impact on Oman's workforce development scenario were: regionalization of nursing institutes, active collaboration with universities and overseas specialty boards, qualitative improvement of the education system, development of a strong continuing professional development system, efforts to improve workforce management, planned change management and needs-based micro/macro-level studies. Strong political will and bold policy initiatives, dedicated workforce planning and educational endeavours have all contributed to help Oman to develop its health workforce stocks and gain

  16. Health workforce development planning in the Sultanate of Oman: a case study.

    Science.gov (United States)

    Ghosh, Basu

    2009-06-11

    Oman's recent experience in health workforce development may be viewed against the backdrop of the situation just three or four decades ago, when it had just a few physicians and nurses (mostly expatriate). All workforce categories in Oman have grown substantially over the last two decades. Increased self-reliance was achieved despite substantial growth in workforce stocks. Stocks of physicians and nurses grew significantly during 1985-2007. This development was the outcome of well-considered national policies and plans. This case outlines how Oman is continuing to turn around its excessive dependence on expatriate workforce through strategic workforce development planning. The Sultanate's early development initiatives focused on building a strong health care infrastructure by importing workforce. However, the policy-makers stressed national workforce development for a sustainable future. Beginning with the formulation of a strategic health workforce development plan in 1991, the stage was set for adopting workforce planning as an essential strategy for sustainable health development and workforce self-reliance. Oman continued to develop its educational infrastructure, and began to produce as much workforce as possible, in order to meet health care demands and achieve workforce self-reliance. Other policy initiatives with a beneficial impact on Oman's workforce development scenario were: regionalization of nursing institutes, active collaboration with universities and overseas specialty boards, qualitative improvement of the education system, development of a strong continuing professional development system, efforts to improve workforce management, planned change management and needs-based micro/macro-level studies. Strong political will and bold policy initiatives, dedicated workforce planning and educational endeavours have all contributed to help Oman to develop its health workforce stocks and gain self-reliance. Oman has successfully innovated workforce

  17. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  18. 78 FR 42027 - Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements

    Science.gov (United States)

    2013-07-15

    ... Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements AGENCY: Employee... illustrations given to participants in defined contribution pension plans, such as 401(k) and 403(b) plans. The... Labor, 200 Constitution Avenue NW., Washington, DC 20210, Attention: Pension Benefit Statements Project...

  19. Proposals of French representatives to the world summit on sustainable development; Les propositions des acteurs francais pour le sommet mondial du developpement durable

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The aim of the Rennes colloquium was to present and discuss the proposals made by the French representatives (citizens, associations, companies, local authorities, universities, research institutes etc..) and which were presented at the world summit on sustainable development (Johannesburg, August 26 - September 4, 2002). This document presents, first, a summary of the work carried out by the 'energy' group on: the north-south problem and the need for the development of education plans on sustainable development, the climate change and the shared but differentiated liability, the mastery of consumptions and the development of renewable energy sources. A table summarizes the initiatives proposed by the group: decentralized energy production for the development of rural areas, institutional and financial mechanisms for the sustainable development of the energy efficiency of renewable energy sources, and the energy efficiency and the renewable energies for a sustainable development of urban areas. The second part of this document is the report made by the 'energy' group to the French committee for the summit: energy for the sustainable development and the fight against paucity, biomass as first stake of sustainable energy development for education plans, rural energy for the development, mastery of energy consumptions in urban areas, energy production and transport on networks. A report made by the non-governmental ecological organizations completes the document and presents the possible contribution of the French energy policy to the sustainable development of France. (J.S.)

  20. Milestones in Language Planning and Development Aid

    Science.gov (United States)

    Coleman, Hywel

    2017-01-01

    This paper tracks the changing relationships between language planning and development aid over a period of 70 years from the end of the Second World War to the present day. Drawing on documentary resources--in particular, the published proceedings of the Language and Development Conferences (LDCs)--the paper identifies a number of significant…

  1. Evaluation of Mexico's 1975-2000 energy plan

    International Nuclear Information System (INIS)

    Bazan-Perkins, Sergio D.; Fernandez-Zayas, Jose L.

    2008-01-01

    The certainty and trustworthiness of a planning model can best be assessed when projections can be compared with actual developments. The ability to design scenarios and to evaluate demographic, economic and technological change is also increased with periodic comparisons between plans and actual facts. In 1976, the Mexican government published a 25 year power supply plan for the country, in which a development of non-fossil fuel plants was recommended, largely due to environmental considerations. It was proposed that the new demand should be met mainly with renewable energy sources and nuclear power. The study stated that hydrocarbons would reach a peak between 2003 and 2005, and that after this point the descent of fuel consumption would proceed at an increased velocity. Under this program, the dependence of Mexico on fuel for electricity would be gradually reduced as the 21st century progressed. The suggestion was not assumed by successive governments, and fossil fuel plants took the place of the proposed nuclear plants. However, the original 25 years power plan has proved to be quite accurate in its social and economic previsions, and allows the validation of a new, more powerful and reliable planning model. This paper presents the results of the validation of the model, as well as major considerations to be heeded in the future to increase certainty in further planning efforts. The projection of a better, more sustainable and reliable energy future is also proposed

  2. The SRS analytical laboratories strategic plan

    International Nuclear Information System (INIS)

    Hiland, D.E.

    1993-01-01

    There is an acute shortage of Savannah River Site (SRS) analytical laboratory capacity to support key Department of Energy (DOE) environmental restoration and waste management (EM) programs while making the transition from traditional defense program (DP) missions as a result of the cessation of the Cold War. This motivated Westinghouse Savannah River Company (WSRC) to develop an open-quotes Analytical Laboratories Strategic Planclose quotes (ALSP) in order to provide appropriate input to SRS operating plans and justification for proposed analytical laboratory projects. The methodology used to develop this plan is applicable to all types of strategic planning

  3. A Weighted Goal Programming model for planning sustainable development applied to Gulf Cooperation Council Countries

    International Nuclear Information System (INIS)

    Jayaraman, Raja; Colapinto, Cinzia; La Torre, Davide; Malik, Tufail

    2017-01-01

    Highlights: • Application of multi-criteria optimization model for sustainable development. • GHG emissions targets cannot be attainable due to reliance on hydrocarbon sources. • Provides quantitative evidence for future investments in green energy. • Application to Gulf Cooperation Countries. - Abstract: The United Nations agenda for sustainable development by the year 2030 proposes 17 sustainable development goals which include access to affordable, reliable and clean energy, sustained economic growth with full productive employment and, urgent action to mitigate environmental degradation. Planning for sustainable development requires integrating conflicting criteria on economy, energy, environment and social aspects. In this paper, we introduce a Weighted Goal Programming model involving criteria on the economic development (GDP), the electricity consumption, the greenhouse gas emissions, and the total number of employees to determine optimal labor allocation across various economic sectors. The proposed model is validated with data from the six members of the Gulf Cooperation Council (namely Bahrain, Kuwait, Oman, Qatar, Saudi Arabia and the United Arab Emirates). The results of the model aim to provide empirical evidence and insights to decision makers and policy analysts in developing optimal strategies able to simultaneously satisfy energy demand, economic growth, labor development and reduction in greenhouse gas emissions to achieve sustainability targets by the year 2030.

  4. Feature-based plan adaptation for fast treatment planning in scanned ion beam therapy

    International Nuclear Information System (INIS)

    Chen Wenjing; Gemmel, Alexander; Rietzel, Eike

    2013-01-01

    We propose a plan adaptation method for fast treatment plan generation in scanned ion beam therapy. Analysis of optimized treatment plans with carbon ions indicates that the particle number modulation of consecutive rasterspots in depth shows little variation throughout target volumes with convex shape. Thus, we extract a depth-modulation curve (DMC) from existing reference plans and adapt it for creation of new plans in similar treatment situations. The proposed method is tested with seven CT serials of prostate patients and three digital phantom datasets generated with the MATLAB code. Plans are generated with a treatment planning software developed by GSI using single-field uniform dose optimization for all the CT datasets to serve as reference plans and ‘gold standard’. The adapted plans are generated based on the DMC derived from the reference plans of the same patient (intra-patient), different patient (inter-patient) and phantoms (phantom-patient). They are compared with the reference plans and a re-positioning strategy. Generally, in 1 min on a standard PC, either a physical plan or a biological plan can be generated with the adaptive method provided that the new target contour is available. In all the cases, the V95 values of the adapted plans can achieve 97% for either physical or biological plans. V107 is always 0 indicating no overdosage, and target dose homogeneity is above 0.98 in all cases. The dose received by the organs at risk is comparable to the optimized plans. The plan adaptation method has the potential for on-line adaptation to deal with inter-fractional motion, as well as fast off-line treatment planning, with either the prescribed physical dose or the RBE-weighted dose. (paper)

  5. Action Plan for the Development of Civic Morality

    Science.gov (United States)

    Chinese Education and Society, 2006

    2006-01-01

    This paper discusses the action plan for the development of civic morality. Here, the importance, substance, ideology and policy principles guiding the development of civic morality is elaborated. In order to strengthen the development of civic morality, it is a must to adapt to the requirements of the developing situation; seize good…

  6. GRI proposes to hold the line on research program

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that the Gas Research Institute has proposed a 1993 US research and development program totaling $201.8 million, the same level as the 1991 but down from $212.9 million this year. GRI filed the 1993 proposal and its 1993-97 R and D plan with the Federal Energy Regulatory Commission. If FERC approves the plan, interstate gas pipeline companies would support the GRI research by collecting a surcharge of 1.51 cents/Mcf on nondiscounted gas transactions and 8 cents/Mcf/month on uniform demand or reservations. The proposed budget is based on a revised funding mechanism FERC is considering for GRI. The research agency's general expanses and capital budget would remain at the 1992 level of $9.8 million

  7. DWPF Development Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Holtzscheiter, E.W.

    1994-05-09

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ``DWPF Process Development Systems.`` To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant.

  8. DWPF Development Plan. Revision 1

    International Nuclear Information System (INIS)

    Holtzscheiter, E.W.

    1994-01-01

    The DWPF Development Plan is based on an evaluation process flowsheet and related waste management systems. The scope is shown in Figure 1 entitled ''DWPF Process Development Systems.'' To identify the critical development efforts, each system has been analyzed to determine: The identification of unresolved technology issues. A technology issue (TI) is one that requires basic development to resolve a previously unknown process or equipment problem and is managed via the Technology Assurance Program co-chaired by DWPF and SRTC. Areas that require further work to sufficiently define the process basis or technical operating envelop for DWPF. This activity involves the application of sound engineering and development principles to define the scope of work required to complete the technical data. The identification of the level of effort and expertise required to provide process technical consultation during the start-up and demonstration of this first of a kind plant

  9. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  10. Sustainable Development and Spatial Planning: Some considerations arising from the Greek case

    Directory of Open Access Journals (Sweden)

    Pavlos Marinos Delladetsima

    2012-03-01

    Full Text Available The paper aims to elaborate on the notion of sustainable development in relation to spatial planning and to question its applicability based on the experience arising from the distinct socio-economic situation in Greece. Experience accumulated in the country with the adoption of sustainable development as a spatial policy concept proves to be in contradiction with perceptions that consider it as a basis for improving the plan making process and the planning system as whole. In this respect, it is argued that sustainable development is not a feasible proposition for planning in Greece and offers little to alleviate urban development and sprawl problems. Further, the paper highlights how a globalised approach to sustainable development and planning in Greece has made a negligible contribution to reinvigorating a weak and disjointed system, while also creating significant adverse effects in spatial policymaking.

  11. 77 FR 43350 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the San Diego Unified...

    Science.gov (United States)

    2012-07-24

    ... impacts, as described in the applicant's habitat conservation plan (plan). We request data, comments, and..., the Carroll Canyon Preserve on the east and south, and aggregate mining operations on the west. The... compliance with all applicable California Department of Education School Development Guidelines (guidelines...

  12. Writing a successful business plan.

    Science.gov (United States)

    Haag, A B

    1997-01-01

    1. In creating and building a business, the entrepreneur assumes all the responsibilities for its development and management, as well as the risks and risks and rewards. Many businesses do not survive because business owners fail to develop an effective plan. 2. The business plan focuses on major areas of concern and their contribution to the success of a new business. The finished product communicates the product/service to others and provides the basis for the financial proposal. 3. Planning helps identify customers, market area, pricing strategy, and competitive conditions. It aids in decision making and is an essential guide for operating a business successfully and measuring progress. 4. The business plan not only serves as a mechanism for obtaining any needed financial resources, but also indicates the future direction of the company.

  13. Self-guided training for deep brain stimulation planning using objective assessment.

    Science.gov (United States)

    Holden, Matthew S; Zhao, Yulong; Haegelen, Claire; Essert, Caroline; Fernandez-Vidal, Sara; Bardinet, Eric; Ungi, Tamas; Fichtinger, Gabor; Jannin, Pierre

    2018-04-04

    Deep brain stimulation (DBS) is an increasingly common treatment for neurodegenerative diseases. Neurosurgeons must have thorough procedural, anatomical, and functional knowledge to plan electrode trajectories and thus ensure treatment efficacy and patient safety. Developing this knowledge requires extensive training. We propose a training approach with objective assessment of neurosurgeon proficiency in DBS planning. To assess proficiency, we propose analyzing both the viability of the planned trajectory and the manner in which the operator arrived at the trajectory. To improve understanding, we suggest a self-guided training course for DBS planning using real-time feedback. To validate the proposed measures of proficiency and training course, two experts and six novices followed the training course, and we monitored their proficiency measures throughout. At baseline, experts planned higher quality trajectories and did so more efficiently. As novices progressed through the training course, their proficiency measures increased significantly, trending toward expert measures. We developed and validated measures which reliably discriminate proficiency levels. These measures are integrated into a training course, which quantitatively improves trainee performance. The proposed training course can be used to improve trainees' proficiency, and the quantitative measures allow trainees' progress to be monitored.

  14. Developing and executing a strategic plan.

    Science.gov (United States)

    Morley, Glenn

    2010-02-01

    Because of the historic economic crisis, the past 18 months--2008 and the first half of 2009--have been challenging for many plastic surgery practices. Prior to the economic crisis in 2008, many practices enjoyed success with little synchronization between financial and productivity results, practice goals, and strategic planning. Now, suddenly, there is a great deal of interest in the alignment of budgets and financial reporting, marketing return on investment (ROI), staff accountability, and overhead management. The process of developing a business plan can serve to bring clarity and objectivity to the assessment of practice goals and market dynamics. The business planning process also provides assurance of more efficient use of the practice's human and capital resources. Ultimately, the process will bring order, discipline, and focus to practice stakeholders, thus increasing the likelihood of meeting or exceeding practice goals. The process: (1) defining the mission of the practice; (2) completing a competitive analysis for your market; (3) completing an assessment of your current environment; (4) completing an assessment of the financial health of your practice; (5) preparation of a SWOT (strengths, weakness, opportunity, threat) analysis; and (6) a translation of your mission statement into specific long-term goals and short-term performance objectives. The outcome of completing these tasks should be an actionable plan that will serve as a guide or road map for the practice. A well-articulated plan will solidify staff confidence, continue the advancement of a strong business foundation, and provide clear navigation through this new economic landscape in a way that preserves your ability to provide the care you have devoted yourselves to deliver. Today's needs, and yesterday's lessons, dictate that a well-documented strategic action plan be undertaken. Thieme Medical Publishers.

  15. Key outcomes from stakeholder workshops at a symposium to inform the development of an Australian national plan for rare diseases

    Directory of Open Access Journals (Sweden)

    Molster Caron

    2012-08-01

    development that have been proposed for use in other jurisdictions. The translation of the symposium outcomes to government policy (i.e. a national plan requires the consideration of several factors such as the under-representation of some stakeholder groups (e.g. clinicians and the current lack of evidence required to translate some of the symposium outcomes to policy options. The acquisition of evidence provides a necessary first step in a comprehensive planning approach.

  16. Key outcomes from stakeholder workshops at a symposium to inform the development of an Australian national plan for rare diseases.

    Science.gov (United States)

    Molster, Caron; Youngs, Leanne; Hammond, Emma; Dawkins, Hugh

    2012-08-10

    Calls have been made for governments to adopt a cohesive approach to rare diseases through the development of national plans. At present, Australia does not have a national plan for rare diseases. To progress such a plan an inaugural Australian Rare Diseases Symposium was held in Western Australia in April 2011. This paper describes the key issues identified by symposium attendees for the development of a national plan, compares these to the content of EUROPLAN and national plans elsewhere and discusses how the outcomes might be integrated for national planning. The symposium was comprised of a series of plenary sessions followed by workshops. The topics covered were; 1) Development of national plans for rare diseases; 2) Patient empowerment; 3) Patient care, support and management; 4) Research and translation; 5) Networks, partnerships and collaboration. All stakeholders within the rare diseases community were invited to participate, including: people affected by rare diseases such as patients, carers, and families; clinicians and allied health practitioners; social and disability services; researchers; patient support groups; industry (e.g. pharmaceutical, biotechnology and medical device companies); regulators and policy-makers. All of these stakeholder groups were represented at the symposium. Workshop participants indicated the need for a national plan, a national peak body, a standard definition of 'rare diseases', education campaigns, lobbying of government, research infrastructure, streamlined whole-of-lifetime service provision, case co-ordination, early diagnosis, support for health professionals and dedicated funding. These findings are consistent with frameworks and initiatives being undertaken internationally (such as EUROPLAN), and with national plans in other countries. This implies that the development of an Australian national plan could plausibly draw on frameworks for plan development that have been proposed for use in other jurisdictions. The

  17. Sanitation planning in developing countries

    OpenAIRE

    Kerstens, S.M.

    2016-01-01

    Sanitation planning in developing countries: Added value of resource recovery Worldwide 2.5 billion people lack access to sanitation. This impacts human live, the environment and represents a loss of valuable resources that can be regained from wastewater. This study shows that resource recovery can be a potential driver to accelerate sanitation. A new sanitation decision framework for policy makers was created and tested in Indonesia. The variety of advantages and disadvantages of sanitatio...

  18. Planned Change in Agrarian Countries.

    Science.gov (United States)

    Niehoff, Arthur H.

    The report provides operationally relevant concepts and guidelines for persons responsible for planning and implementing development projects in agrarian countries. A framework for describing or evaluating the conduct of development projects is proposed, and applied to the results of an analysis of 203 case studies of past projects. Influences,…

  19. Sable Offshore Energy Inc.: Response to 'The Canada-Nova Scotia Offshore Petroleum Board Benefits Plan Decision Report' Condition No. 3: Employment and Training Plan; Condition No. 4: Research and Development Plan; Condition No. 6: Disadvantaged Individual or Groups; Condition No. 7: Technology Transfer

    International Nuclear Information System (INIS)

    1998-01-01

    Decisions of the Canada-Nova Scotia Offshore Petroleum Board, regarding the responses of Sable Offshore Energy Inc (SOEI) to conditions imposed by the Board in the Sable Offshore Energy Project Canada-Nova Scotia Benefit Plan Decision Report, have been announced. According to the press release (copy attached), the Board accepted the responses of SOEI regarding the establishment and staffing of an office in Nova Scotia for the implementation and project management and training of project personnel, the level of expenditures for research and development to be undertaken in Nova Scotia, proposed initiatives for employment and training opportunities for disadvantaged individuals and groups, and a technology transfer plan that will facilitate succession planning and create joint venturing opportunities for Nova Scotian and Canadian industry. tabs., figs

  20. The influence of territory planning and social development on strategic decisions in passenger transport development

    Directory of Open Access Journals (Sweden)

    D. Griškevičienė

    2004-10-01

    Full Text Available The main factors of space planning and social development which play an important role in making strategic decisions in passenger transportation have been analysed. A number of strategic aims based on major principles of territory transport planning have been formulated. The investigation made has shown that the operation of public transport is not closely connected with the main carcass of urban territories. This decreases the efficiency of public transport, making it less popular and competitive compared to automobiles. The creation of the strategy of public transport development for the period of its integration into the EU system requires the use of methods taking into account territory planning and social and economic development of the country. The integration of new territories into the existing transportation system, optimization of routes and the increase of transport service quality are aimed to provide higher living standards and better social and economic conditions for the inhabitants. The appropriate tactical decisions in planning the development of modern passenger transport may be made only if the harmonized and well-grounded strategic aims are defined.

  1. Development of a computerized handbook of architectural plans

    NARCIS (Netherlands)

    Koutamanis, A.

    1990-01-01

    The dissertation investigates an approach to the development of visual / spatial computer representations for architectural purposes through the development of the computerized handbook of architectural plans (chap), a knowledge-based computer system capable of recognizing the metric properties of

  2. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2014-11-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  3. The Role of Regional Strategies in Sustainable Development: The Approach of City Plan

    Directory of Open Access Journals (Sweden)

    Mustafa Polat

    2016-01-01

    Full Text Available In the world economy and development, understanding changes are occurring, with the EU integration process of developments and understanding of planning priorities when considered as together, "city" scale development approach and an appropriate planning system, that is the basis of Turkey`s administrative division and the national management system, should be improved self-rises. To reduce disparities among regions to an acceptable level and development of relatively underdeveloped regions and cities, naturally, a development and planning system even starting from the city and province levels, is required. In today's sustainable understanding and evolution tools, burden important functions to local units, as "participation" in the foreground stands out in the stages of planning and execution of the development strategies. Regional and city development plans and strategies as the center of rapid and balanced development dynamics are sensitive to local needs and local initiatives are required in being a trigger level. The study is done with Goal Directed Project Management methodology, and in the study city level taken as an example of city scale development approach and an appropriate planning system.

  4. Geospatial Based Information System Development in Public Administration for Sustainable Development and Planning in Urban Environment

    OpenAIRE

    Georgios N. Kouziokas

    2016-01-01

    It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several progra...

  5. A multi-criteria methodology for energy planning and developing renewable energy sources at a regional level: A case study Thassos, Greece

    International Nuclear Information System (INIS)

    Mourmouris, J.C.; Potolias, C.

    2013-01-01

    Rational energy planning under the pressure of environmental and economic problems is imperative to humanity. An evaluational framework is proposed in order to support energy planning for promoting the use of renewable energy sources. A multi-criteria decision analysis is adopted, detailing exploitation of renewable energy sources (including Wind, Solar, Biomass, Geothermal, and small Hydro) for power and heat generation. The aim of this paper is the analysis and development of a multilevel decision-making structure, utilizing multiple criteria for energy planning and exploitation of Renewable Energy Sources of at the regional level. The proposed evaluation framework focuses on the use of a multi-criteria approach as a tool for supporting energy planning in the area of concern, based on a pool of qualitative and quantitative evaluation criteria. The final aim of this study is to discover the optimal amount of each Renewable Energy Source that can be produced in the region and to contribute to an optimal energy mix. In this paper, a case study for the island of Thassos, Greece is analyzed. The results prove that Renewable Energy Sources exploitation at a regional level can satisfy increasing power demands through environmental-friendly energy systems that combine wind power, biomass and PV systems. - Highlights: ► An evaluational framework is proposed in order to support energy planning. ► A multi-criteria decision analysis is adopted, detailing exploitation of RES for power and heat generation. ► The aim is to discover the optimal amount of each RES that can be produced in each region.

  6. An eCertificate Program in Transportation Planning

    Science.gov (United States)

    2012-08-01

    In this project, researchers developed a proposal to extend the delivery of the recently developed : Graduate Certificate in Transportation Planning at Texas A&M University (TAMU) to a wider audience via : distance education (online or eCertificate)....

  7. THE COMMUNITY PLANNING PROCESS. KANSAS STATE UNIVERSITY SHORT COURSE SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, 6.

    Science.gov (United States)

    WEISENBURGER, RAY B.

    PART OF A KANSAS STATE UNIVERSITY SERIES ON COMMUNITY PLANNING AND DEVELOPMENT, THIS MONOGRAPH DISCUSSES THE STAGES IN THE PREPARATION AND IMPLEMENTATION OF COMPREHENSIVE URBAN SCHEMES. FIRST OF ALL, SOCIAL ACCEPTANCE, ECONOMIC, FEASIBILITY, POLITICAL RESPONSIBILITY, AND ENVIRONMENTAL SATISFACTION ARE VITAL TO SUCCESSFUL PLANNING. ORGANIZATION FOR…

  8. Planning and support materials in teaching story comprehension from the interbehavioral approach

    Directory of Open Access Journals (Sweden)

    Ana Cristina Mascareño Bórquez

    2017-12-01

    Full Text Available Despite the latest changes in educational reforms within the country, curriculum plans and ongoing program renewals aimed at resolving the educational gap reflected in national statistics, the results remain unfavorable. This leads to reflection and analysis to generate and implement new forms and teaching strategies. The purpose of this paper is to present the design of an alternative proposal for planning and the development of support materials, developed according to the second block of sixth grade primary education, in two expected learning contained in the formal basic education curriculum. Centered on the interaction in teaching-learning and according to different levels of functional aptitude. Subsequently it underwent a process of piloting and revision by experts to prove the pertinence of the planning and precisions for its implementation. As results, the support materials and the planning proposal are presented and discussed with the authors who have worked on planning proposals from the inter-behavioral approach.

  9. The emergency plan of the ININ

    International Nuclear Information System (INIS)

    Ruiz C, M.A.

    1991-01-01

    The emergency plan of the ININ, it was elaborated in 1988 and revised by the National Commission of Nuclear Safety and Safeguards (CNSNS) in 1989. At the beginning of 1990 and with the support of the IAEA it was practiced the first revision to the text of this plan, for what the proposal revision is what constitutes the development of this report

  10. Development and implementation of a watershed management plan forLlac la Biche, Alberta, Canada.

    Science.gov (United States)

    White, J; Logan, M; Rawles, M

    2006-01-01

    Lakeland County is experiencing increasing developmental pressures arising from the oil and gas boom at nearby Fort McMurray. There is increased industrial traffic passing through the county, and 600 new residential lots are proposed in 2005, almost double from 5 years ago. Deteriorating surface water quality has been a concern in the area due to an increase in development and agriculture, while excessive fish harvesting and winterkills have impacted commercial and recreational fisheries. Today, walleye and pike populations in the lake remain collapsed and restocking efforts have not been successful. Due to the lack of studies done on the watershed, the county is leading a multidisciplinary research study which includes a baseline water quality study, riparian health assessments, land use mapping and ground-truthing and projects with the local health authority. This research has been summarized in a comprehensive state of the watershed report, which will be used to complete a watershed management plan for the Lac la Biche watershed. Recommendations from the state of the watershed report and watershed management plan will also be incorporated into municipal planning documents and recommend changes to the Municipal Government Act itself.

  11. Development of model plans in three dimensional conformal radiotherapy for brain tumors

    International Nuclear Information System (INIS)

    Pyo, Hongryull; Kim, Gwieon; Keum, Kichang; Chang, Sekyung; Suh, Changok; Lee, Sanghoon

    2002-01-01

    Three dimensional conformal radiotherapy planning is being used widely for the treatment of patients with brain tumor. However, it takes much time to develop an optimal treatment plan, therefore, it is difficult to apply this technique to all patients. To increase the efficiency of this technique, we need to develop standard radiotherapy plans for each site of the brain. Therefore we developed several 3 dimensional conformal radiotherapy plans (3D plans) for tumors at each site of brain, compared them with each other, and with 2 dimensional radiotherapy plans. Finally model plans for each site of the brain were decided. Imaginary tumors, with sizes commonly observed in the clinic, were designed for each site of the brain and drawn on CT images. The planning target volumes (PTVs) were as follows; temporal tumor-5.7 x 8.2 x 7.6 cm, suprasellar tumor-3 x 4 x 4.1 cm, thalamic tumor-3.1 x 5.9 x 3.7 cm, frontoparietal tumor-5.5 x 7 x 5.5 cm, and occipitoparietal tumor-5 x 5.5 x 5 cm. Plans using parallel opposed 2-portals and/or 3 portals including fronto-vertex and 2 lateral fields were developed manually as the conventional 2D plans, and 3D noncoplanar conformal plans were developed using beam's eye view and the automatic block drawing tool. Total tumor dose was 54 Gy for a suprasellar tumor, 59.4 Gy and 72 Gy for the other tumors. All dose plans (including 2D plans) were calculated using 3D plan software. Developed plans were compared with each other using dose-volume histograms (DVH), normal tissue complication probabilities (NTCP) and variable dose statistic values (minimum, maximum and mean dose, D5, V83, V85 and V95). Finally a best radiotherapy plan for each site of brain was selected. 1) Temporal tumor; NTCPs and DVHs of the normal tissue of all 3D plans were superior to 2D plans and this trend was more definite when total dose was escalated to 72 Gy (NTCPs of normal brain 2D plans: 27%, 8% → 3D plans: 1%, 1%). Various dose statistic values did not show any

  12. Developing a promotion plan for health care marketing.

    Science.gov (United States)

    Hallums, A

    1994-07-01

    Promotion of a health care provider's services is essential for communication with its customers and consumers. It is relevant to an organization's marketing strategy and is an element of what is described as the marketing mix. This paper considers the relationship of promotion to the marketing of services and proposes a plan for the promotion of the organization as a whole which can also be applied to an individual service or specialty. Whilst specific reference is made to an National Health Service (NHS) Trust it is also relevant to a Directly Managed Unit.

  13. British discretion in Dutch planning: establishing a comparative perspective for regional planning and local development in the Netherlands and the United Kingdom

    NARCIS (Netherlands)

    Janssen-Jansen, L.B.; Woltjer, J.

    2010-01-01

    Regional planning and development is continuing to take an important role in planning agendas throughout Europe. In the United Kingdom (UK), the planning system has been reformed during the last decades, marking a noticeable shift from a development-led towards a more plan-led system. In the

  14. Integrated National Energy Planning (INEP) in developing countries

    International Nuclear Information System (INIS)

    Munasinghe, M.

    1989-01-01

    Issues of coordinated energy planning are emphasized, with particular reference to interrelationships among the policies adopted in various energy sub-sectors such as electric power (including hydro, nuclear, geothermal, oil and coal sources), petroleum, natural gas, coal, non-conventional (solar, bio-gas, mini-hydro) and traditional fuels (woodfuel, bagasse or vegetable residue). The scope and objectives of integrated national energy planning, the policy tools available, and constraints particular to the developing countries are discussed next. Section 3.0 outlines how energy planning is carried out, while the problems of implementing the resulting policy conclusions are examined in section 4.0. 5 refs, 4 figs

  15. Dynamic plan modelling and visualization : converting an urban development plan into a transition scenario

    NARCIS (Netherlands)

    Vries, de B.; Jessurun, A.J.; Sadowski - Rasters, G.; Tidafy, T; Dorta, T

    2009-01-01

    Application of 3D models in urban planning practice is still limited to visualization of existing or newly designed situations. Municipalities are looking for possibilities to communicate the transition process of the urban development area with the citizens. A prototype system was developed to

  16. Study on Strategic Planning of Road and Bridge Infrastructure Development in City Planning: Taking Porto-novo City of Benin Republic as Example

    Directory of Open Access Journals (Sweden)

    Boko-haya Dossa Didier

    2018-01-01

    Full Text Available Concern about the townlet infrastructure construction in developing country is one of the crucial part of county town planning and development. By taking the overall planning and design in a case study of Porto-novo city at Republic of Benin, this paper analyzes the characteristics and opportunities of Porto-novo city and puts forward corresponding infrastructure construction strategy. In the end, the paper comes up with specific plan of planning and design under the background of Porto-novo's planning of development strategy.

  17. Career competences and importance of their development in planning of career perspective

    OpenAIRE

    Adomaitienė, Jūratė; Zubrickienė, Ilona

    2010-01-01

    Attempts are made in this article to reveal the essence of the process, related to the planning of career perspective, to highlight the aspect of dynamism in modern career competence, demonstrating importance and significance of its continuous development for planning of career perspective. Analysis is developed, introducing attitude of teachers and lecturers towards competence of their own career, its development and significance, planning perspective of one’s own career; towards reflection ...

  18. Dynamic Integrated Resource Strategic Planning Model: A Case Study of China’s Power Sector Planning into 2050

    Directory of Open Access Journals (Sweden)

    Yan Xu

    2017-07-01

    Full Text Available This paper proposes a Dynamic Integrated Resource Strategic Planning (DIRSP model based on a semi-Markov decision-making process. Considering the policy transfer probability matrix, we discuss the influence of different policy portfolios and input intensity on the timing and scale of low-carbon transition during the power planning process. In addition, we discuss various planning scenarios from a socio-technical system transition perspective. Scenarios are compiled to compare the pathways of power planning in China during 2015–2050 under different policies, including a typical reproduction pathway with unchanged policy that maintains the original coal-dominated technology pathway, a de-alignment/re-alignment pathway where renewable energy power technologies develop from niches to mainstream while the planning time for peak coal power moves ahead in 10–20 years due to subsidies to renewable and carbon tax policy, and the substitution and reconfiguration pathways in which renewable energy technologies compete with coal power in parallel, in which coal power will peak by 2020 while wind power and solar power will realize large-scale development by 2020 and 2030, respectively. Case study on power planning in China indicates that the methodology proposed in our study can enhance our understanding on the low-carbon transition process and the interaction between energy policy and transition pathway.

  19. Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy

    International Nuclear Information System (INIS)

    Song, Ting; Zhou, Linghong; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Jiang, Steve B; Gu, Xuejun

    2015-01-01

    In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient’s unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient’s geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control. (paper)

  20. Underperformance of Planning for Peri-Urban Rural Sustainable Development: The Case of Mentougou District in Beijing

    Directory of Open Access Journals (Sweden)

    Jing Lin

    2016-08-01

    Full Text Available As the basic cell of social structures and spatial units, rural settlement is now experiencing profound changes through the rapid urbanization process underway in China, particularly in peri-urban areas which serve as the main platform and battlefield for urban–rural integration in China’s latest round of new urbanization. Therefore, how to achieve better planning for rural settlement in peri-urban areas is becoming a pressing and paramount research agenda. This paper attempts to explore the possible reasons for the underperformance of planning practice for rural settlement in peri-urban areas of China by taking the Mentougou district of Beijing as a case study. Following a quick and comprehensive review of planning in Mentougou district, a systematic and critical evaluation is then conducted accordingly. It shows that the plans generally play a positive role in development orientation and implementation. Yet, there is still a lot of room for improvement, particularly in the following aspects: (1 lack of initiative and innovation at the local level; (2 lack of long-term vision and consistent implementation; (3 lack of rationale-oriented approach; (4 lack of scientific and in-depth research; (5 lack of multi-stakeholder participation. As a way forward, this paper thus proposes a revised planning scheme for local practice, including classification of typologies and the customized planning design for each typology. At last, this paper calls for more in-depth scientific research on some key topics in the planning field, domestically and internationally.

  1. Develop a Professional Learning Plan

    Science.gov (United States)

    Journal of Staff Development, 2013

    2013-01-01

    A professional learning plan establishes short-and long-term plans for professional learning and implementation of the learning. Such plans guide individuals, schools, districts, and states in coordinating learning experiences designed to achieve outcomes for educators and students. Professional learning plans focus on the program of educator…

  2. Plan Colombia or development as security

    Directory of Open Access Journals (Sweden)

    Juan Pablo Guevara Latorre

    2015-01-01

    the most relevant policy for the construction of the State in 21st-century Colombia from a critical standpoint. The document makes it possible to show that Plan Colombia is a privatized form of development, interpreted in terms of security based on an incomplete understanding of the Colombian conflict that prevails into our present

  3. The Mediterranean Solar Plan: Project proposals for renewable energy in the Mediterranean Partner Countries region

    International Nuclear Information System (INIS)

    Jablonski, Sophie; Tarhini, Mohamad; Touati, Manaf; Gonzalez Garcia, David; Alario, Juan

    2012-01-01

    This paper presents a first assessment of the renewable energy projects, proposed by the nine Mediterranean Partner Countries (MPCs) under the Mediterranean Solar Plan (MSP) and the associated potential economic impacts. As one of the priority projects of the Union for the Mediterranean (UfM), the MSP's objective which attracted most attention until now is the intention to deploy an additional 20 GW of renewable electrical capacity in the Southern and Eastern Mediterranean region (covering the MPCs plus Turkey) by 2020. The main findings of this research are: (1) as of February 2010, a total of 10.3 GW of renewable project proposals were identified in the MPCs, corresponding to about half of the 20 GW target; (2) investment needs for the identified projects could amount to EUR 21 billion by 2020, which represents about five times the amount invested by the region in conventional electricity generation in the last decade; and (3) the difference between the cost of renewable electricity generation and the economic cost of its fossil fuel alternatives could amount to EUR 1.2 billion. Insights stemming from the results of this research can generate useful regional messages for energy policy leaders in the MPCs to accelerate the development of renewable energy projects. - Highlights: ► We conducted a systematic survey of renewable energy projects in the Mediterranean. ► The identified projects correspond to half the MSP 20 GW target. ► Maturity assessment is used to classify the advancement of the projects. ► We estimated the investment needs and required subsidies in the region by 2020.

  4. Ten-Year Network Development Plan - 2015 edition, executive summary

    International Nuclear Information System (INIS)

    2016-01-01

    Complying with the European and French laws, each year, RTE prepares and publicizes a Ten-Year Network Development Plan (NDP) to meet the expectations of its stakeholders and customers. The NDP lists the network development projects that RTE plans to complete and commission over a 3-year period and presents the main power transmission infrastructure work envisaged for the next Ten-years. Beyond, it outlines the possible network adaptation needs for a variety of energy transition scenarios. Over the next 10 years, the network investments will make it possible to: - Meet the goals of the Regional Climate Air Energy Plans, - Create 4 GW of extra offshore wind generation integration capacity and 10 GW of additional interconnection capacity, 2/3 more than the current capacity, - Enable the development of economically and demographically dynamic areas, with safe and high-standard electricity supply. In the coming decade, RTE plans: - 1,200 km of new underground and sub-sea DC links, along with their associated converter stations; - 600 km of existing equipment upgrades or new overhead 400 kV AC circuits substituting existing power lines. - and, at the same time, nearly 900 km of underground lines and just over 400 km of overhead 225 kV AC lines should be built. 400 projects are listed in this NDP: - 21% of the operations are on overhead lines (for 3/4 new lines or upgrade and for 1/4 dismantling of existing assets) - 27% concern new underground lines; - 52% on substation adaptations (about 20 new RTE substations and 100 new customer substations connected). Globally, nearly 80% of the network is developed underground or sub-sea. This edition of the Network Development plan is further enriched. In particular, it explains more thoroughly the link between the integration of renewable energy and the entailed development of the transmission network. It also provides a focus on smart grids. This edition relies on mid and long term scenarios describing the evolution of the

  5. Technical Meeting on Existing and Proposed Experimental Facilities for Fast Neutron Systems. Working Material

    International Nuclear Information System (INIS)

    2013-01-01

    The objective of the TM on “Existing and proposed experimental facilities for fast neutron systems” was threefold: 1) presenting and exchanging information about existing and planned experimental facilities in support of the development of innovative fast neutron systems; 2) allow creating a catalogue of existing and planned experimental facilities currently operated/developed within national or international fast reactors programmes; 3) once a clear picture of the existing experimental infrastructures is defined, new experimental facilities are discussed and proposed, on the basis of the identified R&D needs

  6. Technical Meeting on Existing and Proposed Experimental Facilities for Fast Neutron Systems. Presentations

    International Nuclear Information System (INIS)

    2013-01-01

    The objective of the TM on “Existing and proposed experimental facilities for fast neutron systems” is threefold: first, it is intended for presenting and exchanging information about existing and planned experimental facilities in support of the development of innovative fast neutron systems; second, it will allow to create a catalogue of existing and planned experimental facilities currently operated/developed within national or international fast reactors programmes; third, once a clear picture of the existing experimental infrastructures is defined, new experimental facilities will be discussed and proposed, on the basis of the identified R&D needs

  7. 76 FR 45606 - Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan...

    Science.gov (United States)

    2011-07-29

    ...-N131; 80221-1112-80221-F2] Desert Renewable Energy Conservation Plan, Habitat Conservation Plan and Possible Land Use Plan Amendment, Southern California: Environmental Impact Statement AGENCY: Fish and..., as amended, for the proposed Desert Renewable Energy Conservation Plan (DRECP). The EIS will be a...

  8. AN EVALUATION TO IDENTIFY THE BARRIERS TO THE FEASIBILITY OF URBAN DEVELOPMENT PLANS: FIVE DECADES OF EXPERIENCE IN URBAN PLANNING IN IRAN

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Maghsoodi Tilaki

    2014-01-01

    Full Text Available The rapid urbanization in many developing countries has indicat ed several challenges in different aspects. This is due t o inefficient urban planning ap proaches towards managing the development process. Similar to many other developing count ries, Iran has experienced rapid urbanization in recent decades. Although over the last few decades, urban planning processes have been applied to develop Iranian c ities, urban planning has failed to tackle the challenges facing the cities. This paper s eeks to identify the barriers that have prevented Iranian c ities from achieving the goals of urban planning. The purpose of this paper is to provide a comprehensive review of the curre nt literature on the concept of urban planning and to assess the urban development plan proc ess in Iranian cities. The required data were collected through a review of international theoretical studies, Iranian experimental research and governmental reports. The findings of this study reveal five major barriers to the feasibility of the urban planning process , including the urban plans context, structure of urban pla nning, related law and regulatio ns, public participation, and financial resources.

  9. Medical RI development plan of KOMAC

    Science.gov (United States)

    Kim, Kye-Ryung; Jung, Myung-Hwan; Yoon, Sang-Pil; Min, Yi-Sub; Cho, Yong-Sub

    2017-12-01

    Many kinds of radioisotopes (RIs) produced by the high energy (100 200 MeV) proton accelerators are developed by the foreign R&D institutes and the worldwide demands are being increased continuously. The RI production using high energy proton beam higher than 50 MeV was not considerable because of the limit of the proton beam energy from existing proton accelerator facilities in Korea before 2013. The available maximum proton energy was 50 MeV from MC-50 cyclotron of Korea Institute of Radiological and Medical Sciences (KIRAMS) at that time. After the construction of a 100 MeV high-current and high-energy proton accelerator and a new irradiation facility for the RI production in 2013 and 2016 by the Korea Multi-purpose Accelerator Complex (KOMAC) at Korea Atomic Energy Research Institute (KAERI), we can make a plan for the new RI production of Cu-67, Sr-82 and so on. In the medical application fields, the worldwide demand of Sr-82 is being increased rapidly during last several years and the domestic demand of Cu-67 is also expected to be increased in near future. And alpha-emitters, such as Ac-225 and Ra-223, are becoming attractive to the users in the medical science fields in the future. The RI development plan of KOMAC was specified recently reflecting the recent environment changes and requirements from the users. In this paper, the results and present status of RI production and R&D facilities, calculation results related to the RI production yields, and future plans is presented.

  10. Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-08-23

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  11. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-05-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory

  12. Software development to support decommissioning and waste management strategic planning

    International Nuclear Information System (INIS)

    Williams, John; Warneford, Ian; Harrison, J.

    1997-01-01

    One of the components of the UKAEA's mission is to care for and, at the appropriate time, safely dismantle its radioactive facilities which are no longer in use. To assist in the development of an optimised strategy, AEA Technology was commissioned to produce decision support software. This paper describes the background to the development of the software, its key features and current status, and the lessons learnt during the development. The software, known as UKAEA SPS (Strategic Planning System), is a unique support software package that has been developed to assist in the planning of decommissioning and radioactive waste management. SPS models linked decommissioning and waste management strategies covering all of UKAEA's nuclear liabilities. It has been developed around the database package ACCESS, and runs on Pentium PCs; however, it has many of the features of project planning systems. Its principal outputs are costs, timings and utilisation data for the waste stores, processing facilities, transport and disposal operations displayed at any level of aggregation. This allows programme managers to see easily the effects of changing key parameters in a strategy under development. (author)

  13. 25 CFR 47.8 - Who develops the local educational financial plans?

    Science.gov (United States)

    2010-04-01

    ... Section 47.8 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.8 Who develops the local educational financial plans? The local Bureau-operated school supervisor develops the local educational financial plan in active...

  14. Analysis of the existent proposals for the environmental ordering of the Ciudad de la Habana, Cuba

    International Nuclear Information System (INIS)

    Santos A, Camilo Ernesto

    2005-01-01

    Five existing proposals regarding the environmental ordering of the Ciudad de la Habana Cuban province were examined: the framework and the general plan for territorial ordering and urbanism developed by the institute of Physical Planning (IPF, for its Spanish acronym); the project carried out by the united nations; the strategic plan for the city's economic and social development created by the group for the integral development of the city; and the environmental sustainability proposal for Havana city of the CAESAR project (for its Spanish acronym), designed by a grouping of universities from Germany, Cuba, Spain and Mexico. The objective was to analyze, through a comparative methodology, the strategic, relevant and urgent aspects, which are part of the environmental ordering of the Ciudad de La Habana province, thus allowing for determining interactions with regard to the environmental situations that the province is faced with and that curtail the development process of the city. This work intends to establish that there are technical, scientific and academic proposals with regard to the environmental ordering of Havana city that need to be harmonized towards a better planning thereof

  15. Implementation plan of the environmental impact statement on a proposed policy for acceptance of foreign research reactor spent nuclear fuel

    International Nuclear Information System (INIS)

    Matos, J.E.

    1996-01-01

    This paper provides a summary of selected portions of the United States Department of Energy's ''Implementation Plan for the Environmental Impact Statement on a Proposed Policy for Acceptance of Foreign Research Reactor Spent Nuclear Fuel'', DOE/EIS-0218, October 1994

  16. The Abbott School Construction Program: Report on the NJ Department of Education Proposed Regulations on Long-Range Facilities Plans

    Science.gov (United States)

    Ponessa, Joan

    2004-01-01

    This report on Long Range Facilities Plans (LRFPs) analyzes regulations proposed by the New Jersey Department of Education (NJDOE) to implement the Educational Facilities Construction and Financing Act. (EFCFA). EFCFA, which authorizes and governs New Jersey's public school construction program, was enacted in July 2000 to implement the State…

  17. Energy Conservation and Development Plan. Southern Tier Central Region, New York

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    A summary is presented of the work of 40 volunteers working with regional planners to imagine, assess, and prescribe for the development of local energy resources (wind, solar, biomass, and water) and for conservation of all forms of energy. The plan contains a brief summary of the process the citizens followed in formulating the plan, the plans themselves, and appendices which contain more detailed comments by citizens on the possible consequences of the development of each resource. The areas (Chemung, Steuben, and Schuyler counties) experienced severe natural gas curtailments during the winter of 1976-1977. The formulation of an emergency energy conservation plan is also presented.

  18. Energy and nuclear power planning in developing countries

    International Nuclear Information System (INIS)

    1985-01-01

    In this publication of the IAEA, after the introduction, four substantive parts follow. Part I, Energy demand and rational energy supply, deals with the needs for energy, primary energy resources and reserves, energy transport, storage, distribution and conservation, including the environmental effects on energy development. Part II, Economic aspects of energy development, presents an integrated view of the basic concepts of energy economics, evaluation of alternative energy projects with an in-depth comparison of electricity generation costs of nuclear and fossil-fuelled power plants. Part III, World energy development status and trends, begins with an overview of the world energy status and trends and continues with a presentation of the energy situation in industrialized countries and in developing countries. Part IV, Energy planning, deals with the optimization techniques, energy planning concepts and computerized models. The launching conditions and implementation of a nuclear power programme are described in detail. 582 references are given in the text and a bibliographical list of 356 titles has been added

  19. The development of environmental awareness through a proposal for promoting intercomprehension in romance languages among high school seniors

    Directory of Open Access Journals (Sweden)

    Bibiana Amado

    2015-09-01

    Full Text Available This work aims to analyze the treatment of environmental issues in an educational proposal for Intercomprehension in Romance Languages (hereinafter called IC developed by InterRom, a research team from Universidad Nacional de Córdoba, in Argentina. This proposal, aimed at developing high school seniors’ language skills from the perspective of teaching and learning IC from text genres, integrates pluralistic approaches to languages with contributions from socio-discursive interactionism (BRONCKART, 2007, from the sociocultural theory of human development (BRUNER, 1994; NELSON, 1996; ROGOFF, 1993; VYGOTSKY, 1962, 1988 and from cognitive approaches to text comprehension and production (BRITTON and GRAESSER, 1996; HAYES and FLOWERS, 1980, HAYES, 1996; SCARDAMALIA and BEREITER, 1992. Through the convergence of these theoretical perspectives, the proposal promotes IC in French, Italian, Spanish and Portuguese, related to environmental conservation, as well as actions for writing texts in Spanish. The planned language activities involve working with different text genres on environmental issues, such as the extinction of animal species, the production of genetically modified foods and the use of agrochemicals that contaminate the biosphere and threaten the life of all living species, including human beings. The exercises related to these topics, at the same time, encourage students to reflect on critical environmental issues and to develop strategies for writing texts in Spanish. To conclude, it can be argued that the IC proposal is based on social and intercultural approaches that integrate teaching actions, text production processes and science issues regarding the environment. As a result, students are regarded as subjects with competencies to understand discourses from different cultures and to think, write and act within their natural, social and cultural environments.

  20. PROPOSED CHANGES TO TAX LAW IN SOUTH AFRICA: INTEREST-FREE LOANS AS A TOOLIN ESTATE PLANNING?

    Directory of Open Access Journals (Sweden)

    M. J. Preston

    2016-07-01

    Full Text Available Estate planning often involves the sale of an asset by an estate planner (the ownerof the asset to aninter vivostrust, as a related family trust. It also often happensthat the buying trust does not have the necessary funds to pay the purchase price.In this situation it is common practice to finance the sale by means of an interest-free loan agreement. The buying trust becomes the owner of the property, whilethe purchase price remains due and payable to the seller, without the loan amountaccruing interest. The result achieved by the estate planner is that potential furthergrowth of the asset soldis shifted to thetrust, resulting in an estate duty benefit forthe seller. The debate surrounding the use of the interest-free loan as an estateplanning tool has been polarised for years with most researchers concluding thatthe interest-free loan remains a useful estate planning tool. Doubts regarding theuse of such agreements and the trust for estate planning have recently neemrenewed. Since 2013, several statements by the different Ministers of Finance, intheir respective budget speeches, indicated that governmentwill propose taxavoidance legislation that will directly impact the taxation of trusts and connectedparties to a trust. This study will focus on the effect which the recent proposedchanges to the Income Tax Act (58 of 1962 might have on the use of interest-freeloans as an estate planning tool. The study is qualitative in nature with documentanalysis at its core. The main aim is to provide more clarity to estate planners inthis regard. The research concludes that the interest-free loan still has someadvantage as an estate planning tool, but if estate planning is done with only taxplanning and tax savings as motivation, that advantagemay disappear.

  1. Development and application of a decision methodology for the planning of nuclear research and development in Saudi Arabia

    International Nuclear Information System (INIS)

    Abulfaraj, W.H.

    1983-01-01

    The thesis adapts two formal decision methodologies for the planning and development of a Nuclear Research Center for the Kingdom of Saudi Arabia. The methodologies are useful for the selection of alternative nuclear energy strategies. Multiattribute utility theory (MUT) and fuzzy set theory (FST) are selected to accommodate for decision makers' preferences and quick decision. MUT is employed to evaluate four appropriate research center facilities to determine the optimal choice therefrom in order to meet the needs of the proposed center. FST is used to handle site selection decision for the center. Procurement and siting decisions in Saudi Arabia for equipment are based on the demonstrated performance of operating units. Certain procedures discussed in detail in the dissertation reflect this modus operandi. 106 refs

  2. On the Basic Principles of Creating a Regulatory Framework for Strategic Planning of Innovative Development of the Russian Economy

    Directory of Open Access Journals (Sweden)

    Yu. V. Mishin

    2017-01-01

    Full Text Available Purpose: the aim of the work is to substantiate methodological approaches to create the most important component of strategic planning – its regulatory framework. The relevance of the chosen topic of this article is due to the fact that in modern conditions, strategic planning is an important tool for ensuring sustainable development and increasing the competitiveness of the domestic economy. It allows you to identify the most important and priority areas of activity, distribute and ensure the effective use of available limited labor, material and, most importantly, financial resources. Today, domestic strategic planning has a number of significant shortcomings, the main one of which, in our opinion, is the lack of reliable initial information for forecasting and analytical calculations. Methods: the methodological basis is the dialectical method of scientific cognition, the systemic and institutional approach to building an effective information base of strategic planning. In the course of research of the current state and level of industrial rationing, methods of analysis and synthesis, comparisons and analogies were used. As a methodological basis of this article, regulatory legal documents were used in the field of strategic planning in Russia, as well as methodological documents that previously operated in the USSR on the regulation of resource consumption. Results: the result of the work are the goals, tasks and requirements for the strategic planning base proposed by the author. The relationship of production rationing with the basic principles of strategic planning is shown - balance and consistency in priorities, goals, objectives, activities, resources and timing; The effectiveness of methods and methods for achieving goals with the least expenditure of resources used. The possibility of the existence of a standardization of labor costs, the consumption of material and production resources, regardless of the form of ownership of the

  3. The Federal Big Data Research and Development Strategic Plan

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — Summary: This Plan is an important milestone in the Administrations Big Data Research and Development (R&D) Initiative

  4. 75 FR 64389 - Proposed Recommendation to the Social Security Administration for Occupational Information System...

    Science.gov (United States)

    2010-10-19

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2010-0066] Proposed Recommendation to the Social Security Administration for Occupational Information System (OIS) Development Planning; Request for Comment...) to provide independent advice and recommendations on plans and activities to create an occupational...

  5. HAZWDDD [Hazardous Waste Development, Demonstration, and Disposal]: An exercise in corporate planning

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Pechin, W.H.

    1988-01-01

    Both Energy Systems corporate management and US Department of Energy's Oak Ridge Operations Office (DOE-ORO) management have recognized the seriousness of these problems and have established several programs to determine acceptable courses of action. A plan has been developed for low-level radioactive waste (LLW), and an active dialogue pertaining to LLW is maintained with the state and federal regulators. During 1986, DOE-ORO and Energy Systems identified the need for a plan to address hazardous and mixed wastes. Each installation supports the concept of HAZWDDD through funding and the development of individual HAZWDDD implementation plans. A corporate plan is being developed to integrate the issues discussed in the five installation plans. This paper describes the approach taken in collecting the necessary information for the plan, some of the techniques used in analyzing the information provided, preliminary data that have been collected in preparation of this plan, the identification of common concerns and issues, and the integration of this information into a corporate approach to mixed and hazardous waste management. 1 fig., 5 tabs

  6. National climate change action plans: Interim report for developing and transition countries

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, R.; Ness, E.; Hirst, J. [eds.

    1997-10-01

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

  7. Acoustic window planning for ultrasound acquisition.

    Science.gov (United States)

    Göbl, Rüdiger; Virga, Salvatore; Rackerseder, Julia; Frisch, Benjamin; Navab, Nassir; Hennersperger, Christoph

    2017-06-01

    Autonomous robotic ultrasound has recently gained considerable interest, especially for collaborative applications. Existing methods for acquisition trajectory planning are solely based on geometrical considerations, such as the pose of the transducer with respect to the patient surface. This work aims at establishing acoustic window planning to enable autonomous ultrasound acquisitions of anatomies with restricted acoustic windows, such as the liver or the heart. We propose a fully automatic approach for the planning of acquisition trajectories, which only requires information about the target region as well as existing tomographic imaging data, such as X-ray computed tomography. The framework integrates both geometrical and physics-based constraints to estimate the best ultrasound acquisition trajectories with respect to the available acoustic windows. We evaluate the developed method using virtual planning scenarios based on real patient data as well as for real robotic ultrasound acquisitions on a tissue-mimicking phantom. The proposed method yields superior image quality in comparison with a naive planning approach, while maintaining the necessary coverage of the target. We demonstrate that by taking image formation properties into account acquisition planning methods can outperform naive plannings. Furthermore, we show the need for such planning techniques, since naive approaches are not sufficient as they do not take the expected image quality into account.

  8. Developing a master plan for hospital solid waste management: A case study

    International Nuclear Information System (INIS)

    Karamouz, Mohammad; Zahraie, Banafsheh; Kerachian, Reza; Jaafarzadeh, Nemat; Mahjouri, Najmeh

    2007-01-01

    Disposal of about 1750 tons of solid wastes per day is the result of a rapid population growth in the province of Khuzestan in the south west of Iran. Most of these wastes, especially hospital solid wastes which have contributed to the pollution of the environment in the study area, are not properly managed considering environmental standards and regulations. In this paper, the framework of a master plan for managing hospital solid wastes is proposed considering different criteria which are usually used for evaluating the pollution of hospital solid waste loads. The effectiveness of the management schemes is also evaluated. In order to rank the hospitals and determine the share of each hospital in the total hospital solid waste pollution load, a multiple criteria decision making technique, namely analytical hierarchy process (AHP), is used. A set of projects are proposed for solid waste pollution control and reduction in the proposed framework. It is partially applied for hospital solid waste management in the province of Khuzestan, Iran. The results have shown that the hospitals located near the capital city of the province, Ahvaz, produce more than 43% of the total hospital solid waste pollution load of the province. The results have also shown the importance of improving management techniques rather than building new facilities. The proposed methodology is used to formulate a master plan for hospital solid waste management

  9. Long term plan of atomic energy development and utilization

    International Nuclear Information System (INIS)

    1982-01-01

    The atomic energy utilization and development in Japan have progressed remarkably, and already nuclear power generation has borne an important part in electric power supply, while radiation has been utilized in the fields of industry, agriculture, medicine and so on. Now, atomic energy is indispensable for national life and industrial activity. The former long term plan was decided in September, 1978, and the new long term plan should be established since the situation has changed largely. The energy substituting for petroleum has been demanded, and the expectation to nuclear power generation has heightened because it enables stable and economical power supply. The independently developed technology related to atomic energy must be put in practical use. The peaceful utilization of atomic energy must be promoted, while contributing to the nuclear non-proliferation policy. The Atomic Energy Commission of Japan decided the new long term plan to clearly show the outline of the important measures related to atomic energy development and utilization in 10 years hereafter, and the method of its promotion. The basic concept of atomic energy development and utilization, the long term prospect and the concept on the promotion, the method of promoting the development and utilization, and the problems of funds, engineers and location are described. (kako, I.)

  10. Integrating robust timetabling in line plan optimization for railway systems

    DEFF Research Database (Denmark)

    Burggraeve, Sofie; Bull, Simon Henry; Vansteenwegen, Pieter

    2017-01-01

    We propose a heuristic algorithm to build a railway line plan from scratch that minimizes passenger travel time and operator cost and for which a feasible and robust timetable exists. A line planning module and a timetabling module work iteratively and interactively. The line planning module......, but is constrained by limited shunt capacity. While the operator and passenger cost remain close to those of the initially and (for these costs) optimally built line plan, the timetable corresponding to the finally developed robust line plan significantly improves the minimum buffer time, and thus the robustness...... creates an initial line plan. The timetabling module evaluates the line plan and identifies a critical line based on minimum buffer times between train pairs. The line planning module proposes a new line plan in which the time length of the critical line is modified in order to provide more flexibility...

  11. Developing strategic plans for effective utilization of research reactors

    International Nuclear Information System (INIS)

    Ridikas, Danas

    2015-01-01

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  12. Developing strategic plans for effective utilization of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ridikas, Danas [International Atomic Energy Agency, Vienna (Austria). Dept. of Nuclear Sciences and Applications

    2015-12-15

    Strategic plans are indispensable documents for research reactors (RRs) to ensure their efficient, optimized and well managed utilization. A strategic plan provides a framework for increasing utilization, while helping to create a positive safety culture, a motivated staff, a clear understanding of real costs and a balanced budget. A strategic plan should be seen as an essential tool for a responsible manager of any RR, from the smallest critical facility to the largest reactor. Results and lessons learned are shown from the IAEA efforts to help the RR facilities developing strategic plans, provide review and advise services, organize national and regional stakeholder/user workshops, prepare further guidance and recommendations, document and publish guidance documents and other supporting materials.

  13. Proposed plan for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-03-01

    The US Department of Energy (DOE) in compliance with Section 117(a) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, is releasing the proposed plan for remedial action at the United Nuclear Corporation (UNC) Disposal Site located at the DOE Oak Ridge Operations (ORO) Y-12 Plant, Oak Ridge, Tennessee. The purpose of this document is to present and solicit for comment to the public and all interested parties the ''preferred plan'' to remediate the UNC Disposal Site. However, comments on all alternatives are invited

  14. Network development plan 1995

    International Nuclear Information System (INIS)

    Anon.

    1995-11-01

    Network plan 1995 concerns several strategic problems, among others environmental policy of power transmission lines. Possibilities of restructuring aerial cable network are described. The state of the existing systems and plans for new network systems are presented. (EG)

  15. Preservation of information about the repository for spent nuclear fuels - proposal for action plan; Bevarande av information om slutfoervar foer anvaent kaernbraensle - foerslag till handlingsplan

    Energy Technology Data Exchange (ETDEWEB)

    Bowen-Schrire, Monica; Eckerhall, Daniel; Jander, Hans; Waniewska, Katarina (Vattenfall Power Consultant AB, Stockholm (Sweden))

    2008-10-15

    This report is a proposal for an action plan with the ultimate aim of ensuring that information about the repository for spent nuclear fuel can be preserved and transferred for future generations. The purpose of the proposal for an action plan is to present ideas on tangible measures and guidelines for information preservation and transfer, in the short and long term. The report deals with a number of aspects relating to information preservation as well as risks that can lead to the loss of important information. The proposal for an action plan is based on reasoning about these subjects. The main emphasis is on measures that need to be implemented in the near future to ensure that successive and direct information transfer is handled in a suitable manner. It is suggested that the following measures should be implemented within a five-year period: - Designate a person responsible for information preservation. - Work out guidelines for information preservation and transfer. - Form a network with other organizations in Sweden. - Initiate a dialogue with other countries, especially USA and France. - Participate in seminars, conferences and workgroups on an international level within the IAEA and NEA. In a longer time perspective the following measures should also be implemented: - Implement guidelines for information preservation and transfer. - Document the archiving system. - Establish a communication plan. - Archive information about the repository. - Keep the action plan up to date

  16. Towards a European Energy Technology Policy - The European Strategic Energy Technology Plan (Set-Plan)

    International Nuclear Information System (INIS)

    Mercier, A.; Petric, H.; Peteves, E.

    2008-01-01

    The transition to a low carbon economy will take decades and affect the entire economy. There is a timely opportunity for investment in energy infrastructure. However, decisions to invest in technologies that are fully aligned with policy and society priorities do not necessarily come naturally, although it will profoundly affect the level of sustainability of the European energy system for decades to come. Technology development needs to be accelerated and prioritized at the highest level of the European policy agenda. This is the essence of the European Strategic Energy Technology Plan (SET-Plan). The SET-Plan makes concrete proposals for action to establish an energy technology policy for Europe, with a new mind-set for planning and working together and to foster science for transforming energy technologies to achieve EU energy and climate change goals for 2020, and to contribute to the worldwide transition to a low carbon economy by 2050. This paper gives an overview of the SET-Plan initiative and highlights its latest developments. It emphasises the importance of information in support of decision-making for investing in the development of low carbon technologies and shows the first results of the technology mapping undertaken by the newly established Information System of the SET-Plan (SETIS).(author)

  17. STRATEGIC PLANNING IN THE MANAGEMENT OF DEVELOPMENT OF HOUSE-BUILDING ENTERPRISES

    Directory of Open Access Journals (Sweden)

    R. A. Kadyrov

    2014-01-01

    Full Text Available The system of the shaping strategic plan developments house-building enterprises is offered in sloppy condition market. The considered problems and methodical bases of the shaping adaptive strategic plan and tree of the sub goal to main strategic purpose of the development house-buildingenterprises.

  18. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  19. Tourists' preferences for ecotourism planning and development ...

    African Journals Online (AJOL)

    Tourists' preferences were: revising the price; improved product quality; creation of scenic viewpoints; improved service quality; improved infrastructure and information on the park as well. The study found that the park managers need to reconsider tourist's preferences while planning and developing ecotourism in Rwanda.

  20. Fly-by-light flight control system technology development plan

    Science.gov (United States)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  1. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  2. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  3. Gas development plan - Estonia

    International Nuclear Information System (INIS)

    1994-06-01

    The total supply of natural gas to Estonia is provided by the Russian company ''Lentransgas'', a 10 year contract is under negotiation. The gas transmission system is physically a part of the transmission network in the Baltic region which previously operated as an integral part of the USSR gas transmission system. The potential market is too small to justify investment in an alternative pipeline from the North Sea. The general reduction in purchasing power in the former COMECON countries has resulted in a decreased industrial production in Estonia and lead to a steep decline in natural gas consumption in all sectors except households. The Danish firm ''Dansk Olie og Naturgas A/S'' has been requested to assist the Estonian company ''AS Eesti Gaas J.S.C.'' in preparing a gas development plan for Estonia. Phase 1 of this plan aims to provide a detailed description of the status of the existing situation under the headings of gas supply and demand, transmission and distribution, economy and organization. The most important problems related to the current transition of the Estonian gas sector towards operation under market conditions are addressed, focussing on gas supply and market conditions, flow control and metering. The general organization of the gas sector in Estonia is described and possible models for future organization are discussed. Some recommendations are given and areas in need of further investigation are identified. (AB)

  4. Developing a regional energy plan for two counties in Ireland

    DEFF Research Database (Denmark)

    Connolly, David; Mathiesen, Brian Vad; Lund, Henrik

    2011-01-01

    Developing a sustainable energy supply will most likely require a transition from large-scale centralised plants to decentralised distributed generation. Consequently, local planning authorities will play a more important role in energy planning in the coming years, as more decentralised energy f...

  5. Career Mapping for Professional Development and Succession Planning.

    Science.gov (United States)

    Webb, Tammy; Diamond-Wells, Tammy; Jeffs, Debra

    Career mapping facilitates professional development of nurses by education specialists and nurse managers. On the basis of national Nursing Professional Development Scope and Standards, our education and professional development framework supports the organization's professional practice model and provides a foundation for the professional career map. This article describes development, implementation, and evaluation of the professional career map for nurses at a large children's hospital to support achievement of the nursing strategic goals for succession planning and professional development.

  6. The Personal Development Plan Practice Questionnaire: The Development and Validation of an Instrument to Assess the Employee's Perception of Personal Development Plan Practice

    Science.gov (United States)

    Beausaert, Simon; Segers, Mien; Gijselaers, Wim

    2011-01-01

    Confronted with the speed of technological advancements and increasing global competition, organizations have come to realize that their employees' continuous learning drives business success. A popular tool to support and enhance continuous learning is the personal development plan (PDP). Despite its popularity, empirical evidence of the…

  7. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  8. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  9. Employee Motivation for Personal Development Plan Effectiveness

    Science.gov (United States)

    Eisele, Lisa; Grohnert, Therese; Beausaert, Simon; Segers, Mien

    2013-01-01

    Purpose: This article aims to understand conditions under which personal development plans (PDPs) can effectively be implemented for professional learning. Both the organization's manner of supporting the PDP practice as well as the individual employee's motivation is taken into account. Design/ methodology/approach: A questionnaire was…

  10. Factors that hinder community participation in developing and implementing comprehensive council health plans in Manyoni District, Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel G. Kilewo

    2015-06-01

    Full Text Available Background: Decentralization of public health planning is proposed to facilitate public participation in health issues. Health Sector Reform in Tanzania places emphasis on the participation of lower level health facilities and community in health planning process. Despite availability of policies, guidelines, and community representative organs, actual implementation of decentralization strategies is poorly achieved. This study intended to find out factors that hinder community participation in developing and implementing Comprehensive Council Health Plan (CCHP. Materials and methods: A qualitative approach was conducted in this study with key informants from Health Facility Governing Committees (HFGC, Council Health Service Board (CHSB, and Council Health Management Team (CHMT. Data were collected using in-depth interviews. Data generated were analyzed for themes and patterns. Results: Factors that hindered community participation included lack of awareness on the CCHP among HFGC members, poor communication and information sharing between CHMT and HFGC, unstipulated roles and responsibilities of HFGC, lack of management capacity among HFGC members, and lack of financial resources for implementing HFGC activities. Conclusions: The identified challenges call for policy makers to revisit the decentralization by devolution policy by ensuring that local governance structures have adequate resources as well as autonomy to participate in planning and managing CCHP in general and health facility plans in particular.

  11. Static and Completion Analysis for Planning Knowledge Base Development and Verification

    Science.gov (United States)

    Chien, Steve A.

    1996-01-01

    A key obstacle hampering fielding of AI planning applications is the considerable expense of developing, verifying, updating, and maintaining the planning knowledge base (KB). Planning systems must be able to compare favorably in terms of software lifecycle costs to other means of automation such as scripts or rule-based expert systems.

  12. Rural Planning in Regional Development: The Kenyan Experience ...

    African Journals Online (AJOL)

    Newly independent governments of Asia and Africa embarked on comprehensive ... had proved very effective in assisting European countries to recover from the destruction ... rural development planning and management, poverty alleviation ...

  13. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  14. Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

    International Nuclear Information System (INIS)

    He Jia; Bao Cunkuan; Shu Tingfei; Yun Xiaoxue; Jiang Dahe; Brwon, Lex

    2011-01-01

    Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

  15. Manpower requirements and development for the new 33-GW nuclear generation plan of Japan

    International Nuclear Information System (INIS)

    Nishimura, K.

    1980-01-01

    The future planned level of nuclear power generation was recently amended by the Japan Atomic Energy Commission to 33 GW by the year 1985. It means that further construction of at least 19 nuclear power plants of 1000 MW(e) each will be needed for the accomplishment of this new plan during the next seven years. The technical manpower requirement for this new plan is estimated in this paper by use of a typical model, which requires a staff of 100 persons for the normal operation of a 1000-MW(e) nuclear power plant. Among these technical staff members, the number of well-trained and experienced persons, i.e. 'key personnel', is considered to be 28. A comparison between manpower requirement and supply for the new plan is made for reactor operators, technical staff, radiation safety staff and maintenance staff. Through this comparison, nuclear training programmes for the development of manpower needed for operation and maintenance is reviewed both from the aspects of quality and quantity by taking into account the functions of the existing training courses in Japan. In addition, the periodic inspection of a nuclear power plant requires almost 1300 persons per power plant; they do not belong to the nuclear power companies, but to either directly related or sub-contracted companies. The educational problems for the 'key personnel' among these people are discussed, and a new programme is proposed. (author)

  16. Cumulative effects of planned industrial development and climate change on marine ecosystems

    Directory of Open Access Journals (Sweden)

    Cathryn Clarke Murray

    2015-07-01

    Full Text Available With increasing human population, large scale climate changes, and the interaction of multiple stressors, understanding cumulative effects on marine ecosystems is increasingly important. Two major drivers of change in coastal and marine ecosystems are industrial developments with acute impacts on local ecosystems, and global climate change stressors with widespread impacts. We conducted a cumulative effects mapping analysis of the marine waters of British Columbia, Canada, under different scenarios: climate change and planned developments. At the coast-wide scale, climate change drove the largest change in cumulative effects with both widespread impacts and high vulnerability scores. Where the impacts of planned developments occur, planned industrial and pipeline activities had high cumulative effects, but the footprint of these effects was comparatively localized. Nearshore habitats were at greatest risk from planned industrial and pipeline activities; in particular, the impacts of planned pipelines on rocky intertidal habitats were predicted to cause the highest change in cumulative effects. This method of incorporating planned industrial development in cumulative effects mapping allows explicit comparison of different scenarios with the potential to be used in environmental impact assessments at various scales. Its use allows resource managers to consider cumulative effect hotspots when making decisions regarding industrial developments and avoid unacceptable cumulative effects. Management needs to consider both global and local stressors in managing marine ecosystems for the protection of biodiversity and the provisioning of ecosystem services.

  17. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  18. Environmental Development Plan (EDP): space applications

    International Nuclear Information System (INIS)

    1978-04-01

    This Environmental Development Plan (EDP) identifies and examines the environmental, safety, health, and socioeconomic (ES and H) issues associated with the ongoing DOE Space Applications Program and the associated research, development, and demonstration programs. The EDP presents an ES and H research and development (R/D) program and strategy for timely resolutions of the issues and satisfaction of the associated requirements necessary for precluding impediments to the space nuclear systems technology. The EDP has been limited to the consideration of: (1) space nuclear power system nuclear fuel fabrication; (2) space nuclear power system heat source fabrication; (3) testing of subsystems and assembled systems; (4) R and D in support of space nuclear system development; (5) nuclear system responses to launch and reentry accidents; and (6) nuclear system environmental behavior and recovery

  19. tourists' preferences for ecotourism planning and development

    African Journals Online (AJOL)

    A literature review was adopted to better understand the key concepts related to tourist's ... and availability at Nyungwe Forest Lodge, Nyungwe tope View Hill Hotel, Gisakura .... A recent trail management plan for the park developed in 2012 suggested the .... marketing strategy to promote the tea tourism image in Rwanda.

  20. Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

    International Nuclear Information System (INIS)

    Moe, Wayne Leland

    2015-01-01

    This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a ''critical path'' for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain ''minimum'' levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial ''first step'' in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by

  1. Review on the Significance of Local Plan for Coastal Reclamation Development: The Case of Malacca, Malaysia

    Directory of Open Access Journals (Sweden)

    Ishak Nor Syafa’ah

    2016-01-01

    Full Text Available A Development Plan acts as a planning and controlling instrument that helps to guide in decision making of current and future development. Therefore, in the Malaysian Town and Country Planning Act 1976 (Act 172, the provision of development plan from each level of the planning administration is stated in the Act under Section 6B till Section 16B. In examining the significance of one of the many development plans in Malaysia, i.e. the local plan, this paper therefore, focuses on the provision of a local plan by the Local Planning Authority (LPA of the said area. This paper, thus, aims to evaluate the Central Malacca Local Plan since Malacca is currently experiencing rapid growth in development along the coastal area. The primary data was obtained from interviews with the related planning authorities via face-to-face method. While, secondary data was gathered from related legal documents, policies and guidelines, as well as the existing development plan for the purpose of an in-depth data. Findings revealed incapability of the existing local plan to assist the development control in deciding the planning permission for reclaimed area. The existing local plan shows no zoning for coastal reclamation area because of the rapid growing development and time consuming procedure to amend the local plan according to the Act 172. In addition, the Act 172 and the process in amending the local plan should be more flexible and able to address the current issue efficiently. Finally, the paper concludes with a suggestion for further exploration in order to achieve an operative development process and functioning practice of the local plan.

  2. Reagan proposes cuts in synfuel aid, transfer to Synfuels Corp. from DOE

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-02

    It is reported that U.S. president Ronald Reagan in his budget message for the financial year 1982, has proposed to cut the DOE's planned 1982 expenditure for the synfuels programme by $864 m. He also proposed that the government synfuels effort be transferred to the recently created Synthetic Fuels Corporation. The gasohol programme and biomass development have suffered by the termination of feasibility studies, co-operative agreements and loan guarantee, but the planned tax credits will continue in the case of gasohol, resulting in a subsidy in excess of $18/bbl.

  3. Developing The Organized Village of Kasaan's Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Hamar, Glenn P. [The Organized Village of Kasaan, Ketchikan, AK (United States)

    2013-02-01

    The overall goal of this project is to create a Tribal Energy Action Plan that will serve as the Tribe's blueprint for creating long term energy self sufficiency. The Plan will be developed with input from a committed group of key stakeholders and landowners in the area, will be based on sound data and research, and will address both supply side options of the development of sustainable energy sources, as well as demand-side options for reducing energy consumption. The resulting plan will include defined comprehensive energy strategies and built upon a baseline assessment of where the Tribe currently is in terms of alternative and renewable energy activities; a vision of where the Tribe wants to go; and an action plan of how the Tribe will reach its vision including the identification of viable energy options based on the long-term strategic plan of the Tribe.

  4. Development Application - Terra Nova Development - Canada-Newfoundland Benefits Plan

    International Nuclear Information System (INIS)

    1996-01-01

    The Canada-Newfoundland Benefits Plan, part of the overall application to develop the Terra Nova Field off the coast of Newfoundland details the benefits to Canadians, but most particularly to residents of Newfoundland and Labrador that a vibrant petroleum industry is expected to bring. In this document the proponents commit themselves to a course of action designed to enhance the opportunities for Canadian and Newfoundland participation in the development, in accordance with the Atlantic Accord legislation. In terms of this legislation, the project proponents are obliged to perform development functions from Newfoundland, acquire goods and services for the Terra Nova Development on a 'best value' basis, but consistent with the procurement policies and procedures for benefits. The proponents must consider Canadian and, in particular, Newfoundland benefits as one of the factors in the procurement of goods and services, and require contactors and subcontractors to adhere to the development's benefits principles, objectives and commitments. A 7-page glossary is also included

  5. Industrial developments challenging planning and research endeavours around Songkla Lake

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik; Lauridsen, Erik Hagelskjær

    2004-01-01

    had several broad committees engaged in supporting these planning issues and resolve the conflicts be-tween different stakeholder interests in the regions development. The paper gives an overview over the types of problems that have been addressed in these major plans and studies and the types......, but the specific outcomes of the planning and the scientific result seem to be rather limited. In an attempt to find an explanation to this gap between planning and advice on one hand and the implementation on the other, it is important not only to look for policy answers. These would typically be ‘lack...

  6. Land use planning for sustainable development of peri-urban zones

    Directory of Open Access Journals (Sweden)

    Živanović-Miljković Jelena

    2012-01-01

    Full Text Available Taking into consideration that growth of urban population has impacts on land use and that managing urban population change is one of the most important contemporary challenges, this paper deals with the sustainable development of peri-urban zones which represent important an environment where employment opportunities are developed and resources exploited (particularly agricultural resources and environment where important recreational and leisure activities could be pursued. Within the review of current concepts and planning practices, the concepts of multifunctional agriculture and multifunctional landscapes in peri-urban zones are pointed out, as well as EU Developing Periurban Projects. The paper particularly focuses on the current situation in Serbia, where there is no specific legal basis for the planning of peri-urban areas, although there are positive examples of strategies, regulations and planning documents which treat agriculture and greenery in peri-urban zones in a sustainable manner.

  7. Proposal to increase the drug adherence in a brazilian health unit

    Directory of Open Access Journals (Sweden)

    Ariane Garrocho de Faria

    2016-12-01

    Full Text Available http://dx.doi.org/10.5007/1807-0221.2016v13n24p174 The aim of this work was to use a Strategic Planning tool to check for problems and propose strategic activities that increases the drug treatment adherence in a UBS of Minas Gerais. This study was developed from May to October 2015 using Strategic Planning divided in four stages: explanatory, normative, strategic and tactical situational. Resulting actions were defined in order to increase the drug treatment adherence and reduce unnecessary spending. Thus, the importance of the method was perceived, been able to meet the views of participants need and direct discussions to achieve the proposed goals. In conclusion, the method evidenced the awareness of the participants and the shared responsibility for patients as well as the planning official. It is expected following the implementation of the proposed actions, achieving success in relation to the drug treatment adherence.

  8. Kenya's Climate Change Action Plan. Low Carbon Climate Resilient Development Pathway

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, D.; Sawyer, D.; Stiebert, S.; McFatridge, S. [International Institute for Sustainable Development IISD, Winnipeg, Manitoba (Canada); Wuertenberger, L.; Van Tilburg, X.; Hekkenberg, M. [Energy research Centre of the Netherlands ECN, Policy Studies, Amsterdam (Netherlands); Owino, T.; Battye, W. [ClimateCare, Nairobi (Kenya); Mutia, T. [Regional Institute for Social Enterprise Kenya RISE, Nairobi (Kenya); Olum, P. [Climate Change Consultant (Kenya)

    2012-12-15

    Kenya Vision 2030 - the long-term development blueprint for the country - aims to transform Kenya into 'a newly industrialising, middle-income country providing a high quality of life to all its citizens in a clean and secure environment'. A low carbon climate resilient development pathway, as set out in this Climate Change Action Plan, can help meet Vision 2030 goals through actions that address both sustainable development and climate change. This pathway can also help the Government achieve the Millennium Development Goals and other internationally agreed development goals without compromising the environment and its natural resources. As Kenya realizes its development aspirations, there will be gains and risks. A growing population and economy with migration to cities will mean increases in greenhouse gas (GHG) emissions. Resulting environmental and social conditions, including increased competition over resources, could intensify vulnerability to climate risks. Transitioning to a low carbon climate resilient development pathway can address future risks thereby improving Kenya's ability to prosper under a changing climate while reducing the emissions intensity of a growing economy. Moving forward on the 2010 National Climate Change Response Strategy will help Kenya transition to a low carbon climate resilient development pathway that puts people and livelihoods at the forefront. The strategy recognized the importance of climate change and development, and this Climate Change Action Plan is the logical next step. A yearlong multistakeholder participatory process involving the public sector, private sector and civil society resulted in this Action Plan that identifies priority climate change actions for Kenya for the short, medium and long term. The Government of Kenya takes climate change and its impact on development seriously. Climate change is considered a crosscutting issue that will be mainstreamed in the planning process both at the national

  9. The ‘Development Plan of National Strategic Emerging Industries Promotes Breakthrough Development of High-end Equipment and New Material Industry

    Institute of Scientific and Technical Information of China (English)

    2017-01-01

    The State Council recently printed and distributed the Notice on the‘Development Plan of National Strategic Emerging Industries for the'Thirteenth Five Year Plan'’(The Plan),which made overall deployment and arrangement for development target,key tasks,

  10. Method for Developing a Communication Strategy and Plan for a Nuclear or Radiological Emergency

    International Nuclear Information System (INIS)

    2016-01-01

    The aim of this publication is to provide a practical resource for emergency planning in the area of public communication in the development of a radiation emergency communication plan (RECP). The term 'public communication' is defined as any activity that communicates information to the public and the media during a nuclear or radiological emergency. To avoid confusion, the term public communication has been used in this publication rather than public information, which may be used in other IAEA publications and documents to ensure consistency with the terminology used in describing the command and control system. This publication also aims to fulfil in part functions assigned to the IAEA in the Convention on Assistance in the Case of a Nuclear Accident or Radiological Emergency (Assistance Convention), as well as meeting requirements stated in IAEA Safety Standards Series No. GS-R-2, Preparedness and Response for a Nuclear or Radiological Emergency. Under Article 5(a)(11) of the Assistance Convention, one function of the IAEA is to collect and disseminate to States Parties and Member States information concerning methodologies, techniques and results of research with regard to the response to nuclear or radiological emergencies. This publication is intended to provide guidance to national and local authorities on developing an RECP which incorporates the specific functions, arrangements and capabilities that will be required for public communication during a nuclear or radiological emergency. The two main features of this publication are the template provided to develop an RECP and detailed guidance on developing a communication strategy for emergency preparedness and response to nuclear or radiological emergencies. The template is consistent with the outline of the national radiation emergency plan proposed in Method for Developing Arrangements for Response to a Nuclear or Radiological Emergency (EPR-Method 2003). This publication is part of the IAEA

  11. Environmental Development Plan for Transportation Energy Conservation. FY 79 update

    Energy Technology Data Exchange (ETDEWEB)

    Singh, M. K.; Bernard, III, M. J.

    1978-12-15

    This is the first annual update of the Environment Development Plan (EDP) for the DOE Division of Transportation Energy Conservation program. It identifies the ecosystem, resource, physical environment, health, safety, and socioeconomic concerns associated with the division's transportation programs. These programs include the research, development, demonstration and assessment (RDD and A) of seventeen transportation technologies and several strategy and policy development and implementation projects. The transportation technologies projects deal with highway transport including electric vehicles, marine transport and pipeline transport. This EDP presents a research and assessment plan for resolving any potentially adverse environmental concerns stemming from these programs.

  12. Center Planning and Development Student Engineer

    Science.gov (United States)

    Jenkins, Kenneth T.

    2013-01-01

    This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

  13. Comments on "Women, Development Planning and Government Policies in Pakistan".

    Science.gov (United States)

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social

  14. Developing IT Strategic Planning Using Mobile Enterprise Architecture In The Academic Process of Atma Jaya Makassar University

    Directory of Open Access Journals (Sweden)

    Astrid Lestari Tungadi

    2017-03-01

    Full Text Available The purpose of this research was to examine the feasibility of the development of mobile enterprise strategic plan, analyze the academic process and the utilization of information technology (IT, and generate documentation IT strategic planning by implementing Mobile Enterprise Architecture in the academic process of Atma Jaya University in Makassar. Data were taken from distributing questionnaires to 297 respondents and conducting interviews to 18 respondents. Data were examined using SWOT analysis, the incorporation of academic scorecard analysis and IT balanced scorecard analysis, financial analysis, as well as analytic hierarchy process (AHP. SWOT analysis results indicate that case study is in a weak position, which possibly never take advantage of opportunities since the weakness of the stand or the power is not enough to work on it. In addition, the results of the performance analysis of the utilization of information technology using the Balanced Scorecard analysis show that the average performance is sufficient. The result of documentation of IT strategic planning was analyzed with financial analysis indicating the feasibility of implementation because it provides benefits for university of 141,32%. Furthermore, Analytic Hierarchy Process (AHP to determine the priority of IT strategy proposals shows that the main priority is to develop portal for student and lecturer.

  15. An analytical framework for strategic delta planning : negotiating consent for long-term sustainable delta development

    NARCIS (Netherlands)

    Seijger, C.; Douven, W; Hermans, L.M.; Evers, J.; Phi, H. L.; Brunner, J.; Pols, L.; Ligtvoet, W.; Koole, S.; Slager, K.; Vermoolen, M.S.; Hasan, S.; Hoang, V. T M; van Halsema, G

    2016-01-01

    Sectoral planning on water, agriculture and urban development has not been able to prevent increased flood risks and environmental degradation in many deltas. Governments conceive strategic delta planning as a promising planning approach and develop strategic delta plans. Such plans are linked to

  16. International benchmark and best practices on national infrastructure plans. Application to Spanish strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Pino Hernandez, E.M.; Delgado Quiralte, C.

    2016-07-01

    The need for planning regarding investment in infrastructures is recognised and supported by most governments around the world. Planning helps to take effective and correct decisions, provides a basis for monitoring its impacts and also facilitates further developments. However it requires a high level of organization, coordination among stakeholders and anticipation of transport needs. There are some different methodological approaches for strategic planning. This paper examines the importance of infrastructure planning and how it is undertaken in different countries from Europe and other continents. It is based on a benchmarking about planning procedures of 7 reference countries (UK, France, the Netherlands, Poland, Germany, Japan and USA), in addition to others whose strategic plans are being developed at the present moment such as Croatia or Romania. This benchmarking aims to extract and compare best practices carried out in this field and to define the optimal formulation of strategic planning. In this regard, the benchmarking is focused on some key aspects: firstly, on the plan structure and its main contents. There are a lot of differences about how each country defines the future needs for transport and how it establishes the objectives and the strategies to be followed. Secondly, on the characterisation of the authorities which are responsible of the plan development (level of dependence from the government, know-how…) along with the time frame and final validity of the plans. And finally, the level of detail of the proposed actions and budgetary commitments provided by the strategic plans. Throughout the comparative analysis, the knowledge generated by this benchmarking has allowed setting a series of specific recommendations in strategic planning which can be applied as innovative solutions and best practices in future planning processes in Spain. (Author)

  17. Are master plans effective in limiting development in China's disaster-prone areas?

    OpenAIRE

    Kim, Saehoon; Rowe, Peter G.

    2013-01-01

    The effectiveness of urban master plans in limiting development in a disaster-prone area of China was empirically investigated by measuring cities’ land-cover changes against their master plans. If a master plan serves as guidance for urban polices that reduce property loss from earthquakes, floods, landslides,land subsidence, and rises in sea level, it will substantially limit urban development in areas at risk from environmental hazards. An environmental risk map weighted toward valuable...

  18. The Strategic Plan and Local Economic Development of Cordoba, Argentina

    NARCIS (Netherlands)

    R. Vanella (Ricardo); C. Lucca (Carlos); J.R. Pittari (Jorge Romero); F. Steinberg (Florian); Zwanenburg Maria Zwanenburg (M.)

    2001-01-01

    textabstractThe Strategic Plan of Cordoba (SPC) is one of the few strategic urban development plans in Latin America, which has actually been implemented in the majority of its components. The SPC was conceived as a collective and global project of the city as a whole without excessive conflicting

  19. An integration programme of poverty alleviation and development with family planning.

    Science.gov (United States)

    1997-04-01

    The State Council (the central government) recently issued a Circular for Speeding Up the Integration of Poverty Alleviation and Development with the Family Planning Programme during the Ninth Five-year Plan (1996-2000). The Circular was jointly submitted by the State Family Planning Commission and the Leading Group for Poverty Alleviation and Development. The document sets the two major tasks as solving the basic needs for food and clothing of the rural destitute and the control of over-rapid growth of China's population. Practice indicates that a close Integration Programme is the best way for impoverished farmers to alleviate poverty and become better-off. Overpopulation and low educational attainments and poor health quality of population in backward areas are the major factors retarding socioeconomic development. Therefore, it is inevitable to integrate poverty alleviation with family planning. It is a path with Chinese characteristics for a balanced population and sustainable socioeconomic development. The targets of the Integration Programme are as follows: The first is that preferential policies should be worked out to guarantee family planning acceptors, especially households with an only daughter or two daughters, are the first to be helped to eradicate poverty and become well-off. They should become good examples for other rural poor in practicing fewer but healthier births, and generating family income. The second target is that the population plans for the poor counties identified by the central government and provincial governments must be fulfilled. This should contribute to breaking the vicious circle of poverty leading to more children, in turn generating more poverty. The circular demands that more efforts should focus on the training of cadres for the Integrated Programme and on services for poor family planning acceptors. full text

  20. Plan of promotion and development of unconventional renewable sources

    International Nuclear Information System (INIS)

    Rojas M, Jose Rodrigo

    2016-01-01

    The plan for the promotion and development of unconventional sources renewable energies developed by the Instituto Costarricense de Electricidad is explained. The percentage data from the use of unconventional renewable sources for power generation in Costa Rica is presented [es