WorldWideScience

Sample records for projects utilizing teams

  1. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  2. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  3. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  4. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  5. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  6. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  7. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  8. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  9. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  10. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  11. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  12. 33 CFR 385.17 - Project Delivery Team.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  13. Progress report on recommendations of the Flaring Project Team

    International Nuclear Information System (INIS)

    Macken, C.

    1999-01-01

    Part of the mandate of the Clean Air Strategic Alliance (CASA) is to share decision-making responsibility for air quality management with the government of Alberta, through the ministries of Environmental Protection, Energy, and Health, and the Alberta Energy and Utilities Board (EUB). CASA's vision for air quality in Alberta is that 'the air will be odourless, tasteless, look clear, and have no measurable short- or long-term adverse effects on people, animals, or the environment'. In 1997, CASA approved the establishment of the Flaring Project Team in response to public concern about potential and observed impacts associated with flaring of solution gas. Members of that team established a framework for the management of solution gas flaring. Their long-term goal is to eliminate routine flaring of solution gas. The Project Team assessed existing information on solution gas flaring, including technologies, efficiencies, emissions and impacts. Alternative technologies were also reviewed along with biological and health effects of solution gas flaring. A list of data gaps and research needs was compiled in order to help with the development of the Team's recommendations. The Team's final report was delivered in June 1998. It was recommended that the following policy objective hierarchy be used to guide decisions related to routine solution gas flaring: (1) eliminate routine solution gas flaring, (2) reduce volumes of gas flared, and (3) improve the efficiency of flares. By way of progress the Project Team was able to report that in March, 1999, the EUB issued a draft interim directive to address upstream petroleum industry flaring. The draft Directive incorporates the recommendations from the CASA Flaring Project Team with respect to management of solution gas flaring. In December 1998, changes to the royalty structure to encourage the productive use of flare gas have been announced by the Alberta Department of Energy and Alberta Environmental protection, thus

  14. Defensive behaviours in innovation teams: how project teams discuss defensiveness and its relationship with innovation resilience behaviour and project success

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vuuren, T. van

    2016-01-01

    Project team members and project leaders of innovation projects were interviewed about the possible presence of defensive behaviours within the team. While investigating defensive behaviour can be done validly by observation techniques, to talk about defensiveness within a team often leads to

  15. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  16. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  17. Team effectiveness in Non-Governmental Organizations (NGOs) projects.

    Science.gov (United States)

    Latif, Khawaja Fawad; Williams, Nigel

    2017-10-01

    The incorporation of team context into research and practice regarding team effectiveness in NGOs projects is a constant challenge. The research seeks to address the gap and identify the critical determinants of team effectiveness in projects undertaken by non-governmental organizations. Using a systematic process, the study involved both literature and focus group discussions to generate the required items. A total of 157 respondents (Team Members and Team Leaders) were part of the study that filled the questionnaires. Using exploratory factor analysis followed by confirmatory factor analysis, both convergent and discriminant validity was established. The present study found that team effectiveness in NGO social projects has a total of seven dimensions namely: Inter team coordination, community social linkage, team performance, knowledge, skills, and attitudes, leadership communication and engagement, decision making and information sharing, and team formation. There is a significant lack of research on team effectiveness in NGO projects. Where considerably large proportion of research on team effectiveness has focused on the corporate sector, the non-governmental teams have been neglected. This study clearly highlights the determinants that make up team effectiveness in NGOs. The determinants identified will help to specifically look at the effectiveness of teams in NGO projects. The study would help NGOs identify the dimensions in which they may be performing in a weaker manner and direct their energies in improving the factors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  19. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  20. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  1. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    Science.gov (United States)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a

  2. Implementation of the U.S. utility industry's TEAM-UP commercialization initiative

    International Nuclear Information System (INIS)

    Bergman, M.; Bigger, J.; Hester, S.; Serfass, J.; Hoffner, J.

    1994-01-01

    TEAM-UP is a partnership program of the US electric utility industry and the US Department of Energy to help develop utility PV markets. TEAM-UP is a utility-directed program to significantly increase utility PV experience by promoting installations of utility PV systems. Two primary program areas are proposed for TEAM-UP; (1) Grid-Independent Applications (GIA) -- an initiative to aggregate utility purchases of small-scale, grid-independent applications, and (2) Grid-Connected Applications -- an initiative to identify and competitively award cost-sharing contracts for grid-connected PV systems with high market growth potential, or collective purchase programs involving multiple buyers. This paper describes these programs and outlines the schedule, the procurement status, and the results of surveys, public review workshops, and notices that are part of the TEAM-UP process

  3. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  4. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  5. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  6. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  7. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  8. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  9. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  10. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  11. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    Directory of Open Access Journals (Sweden)

    Aleksandra Rudawska

    2017-03-01

    Full Text Available Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires. The measures used for the study were developed specifcally for the study referring to the previous research in the feld. Findings: Results indicate that leaders in team projects and conditions supporting teamwork are connected with the students’ perception of teamwork effectiveness, while the fairness in team projects is connected with students’ preference of working collectively. Research implications: We conclude that in order to develop a positive attitude towards teamwork, the teamwork projects should be better supported by the instructors (especially supporting the emergence of leader(s and minimising the problem of free riders and the university should create a climate that facilitates teamworking, otherwise team projects might negatively influence students’ attitude towards collective work. Value: On the labour market the teamwork skills are one of the most important skills of employees, as the team-based organizational designs are becoming the norm in work organization. The study is contributing to the understanding of the relations between student experiences and their attitudes as well as the role played by high education in the development of these attitudes. Some previous research in Anglo-Saxon culture countries indicate that team project assignments realised by students during studies might even hinder their attitudes to teamwork and their willingness to work in teams in the future.

  12. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  13. Intercultural team maturity model: Unity, diversity, capability. Achieving optimal performance when leading \\ud a multicultural project team

    OpenAIRE

    Prabhakar, G. P.; Walker, S.

    2005-01-01

    Our research helps to judge ‘maturity’ as an asset to projects and heightens awareness of situational leadership, using intercultural team maturity levels as a tool for optimal project leadership success.\\ud \\ud This study focuses on exactly how to analyse the team members’ ability to adapt to complex intercultural project environments, using an intercultural team maturity model.

  14. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  15. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  16. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  17. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  18. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  19. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  20. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  1. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    OpenAIRE

    Aleksandra Rudawska

    2017-01-01

    Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university) on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires). The measures used f...

  2. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  3. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  4. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  5. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  6. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  7. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  8. Leadership and organizational tenure diversity as determinants of project team effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  9. Leadership and Organizational Tenure Diversity as Determinants of Project Team Effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  10. Problem-Based Service Learning: The Evolution of a Team Project

    Science.gov (United States)

    Connor-Greene, Patricia A.

    2002-01-01

    In this article, I describe the evolution of a problem-based service learning project in an undergraduate Abnormal Psychology course. Students worked in teams on a semester-long project to locate and evaluate information and treatment for specific psychiatric disorders. As part of the project, each team selected relevant bibliographic materials,…

  11. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  12. Team Research at the Biology-Mathematics Interface: Project Management Perspectives

    Science.gov (United States)

    Milton, John G.; Radunskaya, Ami E.; Lee, Arthur H.; de Pillis, Lisette G.; Bartlett, Diana F.

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics…

  13. Student-Led Project Teams: Significance of Regulation Strategies in High- and Low-Performing Teams

    Science.gov (United States)

    Ainsworth, Judith

    2016-01-01

    We studied group and individual co-regulatory and self-regulatory strategies of self-managed student project teams using data from intragroup peer evaluations and a postproject survey. We found that high team performers shared their research and knowledge with others, collaborated to advise and give constructive criticism, and demonstrated moral…

  14. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    Science.gov (United States)

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  15. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  16. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  17. Analysis of Return on Investment in Different Types of Agile Software Development Project Teams

    Directory of Open Access Journals (Sweden)

    Goran MILANOV

    2012-01-01

    Full Text Available This exploratory study of IT project teams in Serbia investigates how the choice of agile methods in different development project teams affects the return-on-investment (ROI. In this paper different types of software project teams are analyzed in order to examine and identify the business-value of using agile methods. In various software development project teams, the ROI of agile methods is yet to be fully explored, while the ROI of traditional methods is well-understood. Since ROI is important indicator of the projects success, in this paper we examine the factors that influence the ROI both from software solution customer point of view, and different agile project teams.

  18. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  19. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  20. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  1. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  2. The neutron utilization and promotion program of TRR-II research reactor project in Taiwan

    International Nuclear Information System (INIS)

    Gone, J.K.; Huang, Y.H.

    2001-01-01

    The objective of the Taiwan research reactor system improvement and utilization promotion project is to reconstruct the old Taiwan research reactor (TRR), which was operated by the Institute of Nuclear Energy Research (INER) between 1973 and 1988, into a multi-purpose medium flux research reactor (TRR-II). The project started in 1998, and the new reactor is scheduled to have its first critical in June of 2006. The estimated maximum unperturbed thermal neutron flux (E 14 n/cm 2 sec, and it is about one order of magnitude higher than other operating research reactors in Taiwan. The new reactor will equip with secondary neutron sources to provide neutrons with different energies, which will be an essential tool for advanced material researches in Taiwan. One of the major tasks of TRR-II project is to promote domestic utilization of neutrons generated at TRR-II. The traditional uses of neutrons in fuel/material research, trace element analysis, and isotope production has been carried out at INER for many years. On the other hand, it is obvious that promotions of neutron spectrometric technique will be a major challenge for the project team. The limited neutron flux from operating research reactors had discouraged domestic users in developing neutron spectrometric technique for many years, and only few researchers in Taiwan are experienced in using spectrometers. It is important for the project team to encourage domestic researchers to use neutron spectrometers provided by TRR-II as a tool for their future researches in various fields. This paper describes the current status of TRR-II neutron utilization and promotion program. The current status and future plans for important issues such as staff recruiting, personnel training, international collaboration, and promotion strategy will be described. (orig.)

  3. Action-Centered Team Leadership Influences More than Performance

    DEFF Research Database (Denmark)

    Braun, Frank C.; Avital, Michel; Martz, Ben

    2012-01-01

    Purpose – Building on a social-technical approach to project management, the authors aim to examine the effect of action-centered leadership attributes on team member's learning, knowledge collaboration and job satisfaction during IT-related projects. Design/methodology/approach – Structural...... collaboration along with individual performance and job satisfaction, and ultimately project success. Research limitations/implications – The action-centered leadership practices construct, developed in this study, can be a good surrogate measure of what is required to be an effective leader in an IT project...... equation modeling was utilized to assess the work environment of team members as well as the leadership practices of their respective project team leaders. Data were collected with a survey questionnaire from 327 team members in a variety of organizations in 15 industry sectors including financial services...

  4. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  5. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  6. Can teams benefit from using a mindful infrastructure when defensive behaviour threatens complex innovation projects?

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vroome, E.M.M. de

    2016-01-01

    Projects are often doomed to fail. An explorative case study which carried out team-based complex innovation projects in a research and technology organisation suggests three main results. 1] Project team leaders experienced that the complexity involved in the various aspects of team functioning,

  7. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  8. Managing Project Team in Local Government B.A. Amujiri Abstract ...

    African Journals Online (AJOL)

    Religion Dept

    government and discovered that managing project team is indispensable in local governments .... subordinate; improve employee motivation; improve communication between .... or events required in completing the project. This will help to.

  9. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    Science.gov (United States)

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  10. Tinkering self-efficacy and team interaction on freshman engineering design teams

    Science.gov (United States)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition

  11. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  12. Hualapai Tribal Utility Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Hualapai Tribal Nation

    2008-05-25

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon

  13. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  14. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  15. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  16. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  17. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  18. The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance

    Science.gov (United States)

    2016-06-30

    AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT

  19. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  20. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  1. NNP-LANL Utilities - Condition Assessment and Project Approach

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Grant Lorenz [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-21

    This report is a presentation on LANL Utilities & Transportation Asset Management; Utility Assets Overview; Condition Assessment; Utilities Project Nominations & Ranking; and Utilities Project Execution.

  2. [Dream Team--a pre-graduate surgical talent development project].

    Science.gov (United States)

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  3. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  4. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  5. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  6. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  7. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  8. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  9. The programme benefits of improving project team communication through a contact centre

    Directory of Open Access Journals (Sweden)

    Bond-Barnard, T. J.

    2013-08-01

    Full Text Available A South African national programme to repair government infrastructure uses a contact centre (or call centre to facilitate and manage communication. An important question is: How does the contact centre benefit the programme and its projects? This study discusses the findings of a survey that quantified the benefits of the programme when the communication between team members in the programme was improved by using a contact centre. The results show that, by using a contact centre to improve the communication between project team members, their perception of communication effectiveness, quality of project deliverables, service delivery, and customer satisfaction of the programme dramatically increases.

  10. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  11. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  12. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  13. Utility requirements for fusion

    International Nuclear Information System (INIS)

    Vondrasek, R.J.

    1982-02-01

    This report describes work done and results obtained during performance of Task 1 of a study of Utility Requirements and Criteria for Fusion Options. The work consisted of developing a list of utility requirements for fusion optics containing definition of the requirements and showing their relative importance to the utility industry. The project team members developed a preliminary list which was refined by discussions and literature searches. The refined list was recast as a questionnaire which was sent to a substantial portion of the utility industry in this country. Forty-three questionnaire recipients responded including thirty-two utilities. A workshop was held to develop a revised requirements list using the survey responses as a major input. The list prepared by the workshop was further refined by a panel consisting of vice presidents of the three project team firms. The results of the study indicate that in addition to considering the cost of energy for a power plant, utilities consider twenty-three other requirements. Four of the requirements were judged to be vital to plant acceptability: Plant Capital Cost, Financial Liability, Plant Safety and Licensability

  14. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  15. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  16. Exploring leadership in self-managed project teams in Malaysia

    Directory of Open Access Journals (Sweden)

    Zaleha Yazid

    2015-01-01

    Full Text Available This paper focuses on a longitudinal approach in exploring leadership in Self-Managed Project Teams (SMPT. SMPT has been known to contribute to organizations by improving productivity and increasing organizational performance. Therefore, understanding the dynamics of leadership in this type of team can be seen as one of the important factors to ensure the success of organizations. Leading a team which manages itself is a challenge as increased autonomy and control is given to the team which eliminates the existence of a leader. It is important to understand the extent of how the external leader is involved within SMPT and whether the external leader approaches highlighted in the literature are applicable in such a situation and how these approaches change during work processes. This study comprises of evidence collected through semi-structured interviews in two small and medium sized organizations in Malaysia. Weekly telephone interviews as well as face-to-face interviews were conducted which provides contextual data for the research. In this research, the evidence suggested that SMPT transform from self-managed toward leader-managed resulting from several factors, such as conflict handling strategies. Specifically, it was found that avoiding conflicts, rather than confronting, transform the team into being leader dependent.

  17. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  18. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  19. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    Science.gov (United States)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  20. Exploring the dynamics of formal and informal networks in complex multi-team development projects

    DEFF Research Database (Denmark)

    Kratzer, J.; Gemuenden, H. G.; Lettl, Christopher

    2007-01-01

    The increasing number of complex multi-team projects and the scarcity of knowledge about how to run them successfully, create a need for systematic empirical studies. We attempt to lessen this empirical gap by examining the overlap and structure of formally ascribed design interfaces and informal...... communication networks between participating teams in two complex multi-team projects in the space industry. We study the two projects longitudinally throughout the design and integration phases of product development. There are three major findings. First, formally ascribed design interfaces and informal...... communication networks overlap only marginally. Second, the structure of informal communication remains largely stable in the transition from the design to the integration phase. The third and most intriguing finding is that the weak overlap between formally ascribed design interfaces and the informal...

  1. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  2. Payment Mechanisms for Integrated Teams in Construction

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available The overwhelming consensus for process andteam integration has emerged as an enabler tomanage construction projects. Theperformance of integrated teams is highlyaffected by the adopted payment mechanism.However, the payment mechanisms availablefor a project may need the team tocompromise in order to agree on a fairmechanism for as many members as possible.This paper introduces a methodology tosimulate the profiles of alternative paymentmechanisms. The methodology aims to helpproject teams define the most appropriatemechanism for each member. The proposedmethodology is therefore novel and superior toexisting cash flow models where the focus hasbeen limited to main contractors only. Topromote its use as a performance enablingmechanism, the methodology utilizes “theproject process map”, “the stakeholders &supply chain”, “the pricing method” and “thepayment mechanism”. This will act as an aid todesign or “fine-tune” payment mechanisms toindividual projects characteristics consideringpayment for off-site materials andcomponents, which always concerns projectfabricators and supply chain.

  3. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  4. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  5. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  6. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Directory of Open Access Journals (Sweden)

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  7. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    Science.gov (United States)

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  8. Reaching unanimous agreements within agent-based negotiation teams with linear and monotonic utility functions.

    Science.gov (United States)

    Sanchez-Anguix, Victor; Julian, Vicente; Botti, Vicente; García-Fornes, Ana

    2012-06-01

    In this article, an agent-based negotiation model for negotiation teams that negotiate a deal with an opponent is presented. Agent-based negotiation teams are groups of agents that join together as a single negotiation party because they share an interest that is related to the negotiation process. The model relies on a trusted mediator that coordinates and helps team members in the decisions that they have to take during the negotiation process: which offer is sent to the opponent, and whether the offers received from the opponent are accepted. The main strength of the proposed negotiation model is the fact that it guarantees unanimity within team decisions since decisions report a utility to team members that is greater than or equal to their aspiration levels at each negotiation round. This work analyzes how unanimous decisions are taken within the team and the robustness of the model against different types of manipulations. An empirical evaluation is also performed to study the impact of the different parameters of the model.

  9. A Team Formation Framework for Managing Diversity in Multidisciplinary Engineering Project

    Directory of Open Access Journals (Sweden)

    Shawqi Mohammed Hossain

    2017-02-01

    Full Text Available Team formation is one of the essential elements in constructing effective teamwork of any team size that requires different skill sets. Diversity in team encourages students to challenge and compete with one another while searching for new ideas, which in turn can lead to a better team performance. In a well-functioning diverse teams, the students who performed poorly may gain benefit by observing how excellent students approach the assignments. They may also benefit by getting advice and assistance from the excellent students. Studies have shown that Malaysian university graduates lack of team skills. The purpose of this paper is to propose a framework for forming a diverse multidisciplinary team among engineering undergraduates based on selected criteria such as individual personality type, gender, and other relevant demographic information. The proposed framework can also be used to design an automated team-formation system based on the identified metrics. The purpose of the framework is to consolidate the existing team formation literature, and to develop and test interventions for maximizing individual member and team performance as a whole that makes an effective team. For this study, a multidisciplinary approach was used where first year engineering students from three different faculties, namely Faculty of Electrical Engineering (FKE, Faculty of Mechanical Engineering (FKM, and Faculty of Biosciences and Medical Engineering (FBME at Universiti Teknologi Malaysia (UTM worked on an innovation project using the Conceive, Design, Implement, and Operate (CDIO framework. Keirsey Temperament Sorter was used as an instrument to identify an individual's personality type.

  10. Technology Applications Team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    Highlights of the Research Triangle Institute (RTI) Applications Team activities over the past quarter are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. The authors gratefully acknowledge the contributions of many individuals to the RTI Technology Applications Team program. The time and effort contributed by managers, engineers, and scientists throughout NASA were essential to program success. Most important to the program has been a productive working relationship with the NASA Field Center Technology Utilization (TU) Offices. The RTI Team continues to strive for improved effectiveness as a resource to these offices. Industry managers, technical staff, medical researchers, and clinicians have been cooperative and open in their participation. The RTI Team looks forward to continuing expansion of its interaction with U.S. industry to facilitate the transfer of aerospace technology to the private sector.

  11. Team Foundation Server 2013 customization

    CERN Document Server

    Beeming, Gordon

    2014-01-01

    This book utilizes a tutorial based approach, focused on the practical customization of key features of the Team Foundation Server for collaborative enterprise software projects.This practical guide is intended for those who want to extend TFS. This book is for intermediate users who have an understanding of TFS, and basic coding skills will be required for the more complex customizations.

  12. Team collaborative innovation management based on primary pipes automatic welding project

    International Nuclear Information System (INIS)

    Li Jing; Wang Dong; Zhang Ke

    2012-01-01

    The welding quality of primary pipe directly affects the safe operation of nuclear power plants. Primary pipe automatic welding, first of its kind in China, is a complex systematic project involving many facets, such as design, manufacturing, material, and on-site construction. A R and D team was formed by China Guangdong Nuclear Power Engineering Co., Ltd. (CNPEC) together with other domestic nuclear power design institutes, and manufacturing and construction enterprises. According to the characteristics of nuclear power plant construction, and adopting team collaborative innovation management mode, through project co-ordination, resources allocation and building production, education and research collaborative innovation platform, CNPEC successfully developed the primary pipe automatic welding technique which has been widely applied to the construction of nuclear power plant, creating considerable economic benefits. (authors)

  13. CERN's IT Consultancy Team: a new IT project support service

    CERN Multimedia

    Ignacio Reguero, IT Department

    2016-01-01

    Newly created IT Consultancy Team provides advice on IT matters to communities at CERN starting new projects or reviewing computing activities of old.   The members of CERN's IT Consultancy Team. The consultants share their knowledge and experience to improve awareness of the IT landscape at CERN and to advise on system architecture and design to ensure best usage of existing IT services and solutions that favour, and are compatible with, the infrastructure already in place. They also help to formalise requirements and assess impact on security, software licenses and cost, especially where contacts among different services are needed and questions go beyond the current computing service offerings. For instance, the IT consultants may help answering questions like the ones below: We are starting with project X – how could we make its computing aspects compatible with the CERN IT infrastructure? E.g. if you need a web content management system favour Drupal instead of Wor...

  14. Project Leader's Dual Socialization and Its Impact on Team Learning and Performance: A Diagnostic Study

    Science.gov (United States)

    Gautam, Tanvi

    2009-01-01

    One of the important challenges for leadership in project teams is the ability to manage the knowledge, communication and coordination related activities of team. In cross-team collaboration, different boundaries contribute to the situated nature of knowledge and hamper the flow of knowledge and prevent shared understanding with those on the other…

  15. Feasibility Study for a Hopi Utility-Scale Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Kendrick Lomayestewa

    2011-05-31

    The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. Wind resource assessments were conducted at two study sites on Hopi fee simple lands located south of the city of Winslow. Reports from the study were recently completed and have not been compared to any existing historical wind data nor have they been processed under any wind assessment models to determine the output performance and the project economics of turbines at the wind study sites. Ongoing analysis of the wind data and project modeling will determine the feasibility of a tribal utility-scale wind energy generation.

  16. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  17. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  18. Balancing creativity and time efficiency in multi-team R&D projects: The alignment of formal and informal networks

    DEFF Research Database (Denmark)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    and their effect on the challenge to balance project creativity and time efficiency. In order to analyse this issue data in two multi-team R&D projects in space industry are collected. There are two intriguing findings that are partly contradicting the state-of-the art knowledge. First, formally ascribed design...... with the team's creativity, whereas it negatively impacts the team's time efficiency....

  19. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  20. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  1. Employee Knowledge Sharing in Work Teams: Effects of Team Diversity, Emergent States, and Team Leadership

    Science.gov (United States)

    Noh, Jae Hang

    2013-01-01

    Knowledge sharing in work teams is one of the critical team processes. Without sharing of knowledge, work teams and organizations may not be able to fully utilize the diverse knowledge brought into work teams by their members. The purpose of this study was to investigate antecedents and underlying mechanisms influencing the extent to which team…

  2. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  3. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  4. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  5. Effectiveness of trauma team on medical resource utilization and quality of care for patients with major trauma.

    Science.gov (United States)

    Wang, Chih-Jung; Yen, Shu-Ting; Huang, Shih-Fang; Hsu, Su-Chen; Ying, Jeremy C; Shan, Yan-Shen

    2017-07-24

    Trauma is one of the leading causes of death in Taiwan, and its medical expenditure escalated drastically. This study aimed to explore the effectiveness of trauma team, which was established in September 2010, on medical resource utilization and quality of care among major trauma patients. This was a retrospective study, using trauma registry data bank and inpatient medical service charge databases. Study subjects were major trauma patients admitted to a medical center in Tainan during 2009 and 2013, and was divided into case group (from January, 2011 to August, 2013) and comparison group (from January, 2009 to August, 2010). Significant reductions in several items of medical resource utilization were identified after the establishment of trauma team. In the sub-group of patients who survived to discharge, examination, radiology and operation charges declined significantly. The radiation and examination charges reduced significantly in the subcategories of ISS = 16 ~ 24 and ISS > 24 respectively. However, no significant effectiveness on quality of care was identified. The establishment of trauma team is effective in containing medical resource utilization. In order to verify the effectiveness on quality of care, extended time frame and extra study subjects are needed.

  6. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  7. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    OpenAIRE

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  8. Initiating and utilizing shared leadership in teams: The role of leader humility, team proactive personality, and team performance capability.

    Science.gov (United States)

    Chiu, Chia-Yen Chad; Owens, Bradley P; Tesluk, Paul E

    2016-12-01

    The present study was designed to produce novel theoretical insight regarding how leader humility and team member characteristics foster the conditions that promote shared leadership and when shared leadership relates to team effectiveness. Drawing on social information processing theory and adaptive leadership theory, we propose that leader humility facilitates shared leadership by promoting leadership-claiming and leadership-granting interactions among team members. We also apply dominance complementary theory to propose that team proactive personality strengthens the impact of leader humility on shared leadership. Finally, we predict that shared leadership will be most strongly related to team performance when team members have high levels of task-related competence. Using a sample composed of 62 Taiwanese professional work teams, we find support for our proposed hypothesized model. The theoretical and practical implications of these results for team leadership, humility, team composition, and shared leadership are discussed. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  9. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  10. Complex approach in telecommunication engineering education: develop engineering skills by a team project

    Directory of Open Access Journals (Sweden)

    Scripcariu Luminița

    2017-01-01

    Full Text Available This paper provides an overview of the educational process of telecommunication engineering students by presenting the preparation of a team project focused on information security. Our educational approach combines basic knowledge such as mathematics with specialized engineering notions and various skills. The project theme is to design, implement and test an encryption algorithm. Students are provided with online courses, specific software programs and Internet access. They have to choose an encryption algorithm, to study its details and to write the script of the encryption algorithm in MATLAB program. The algorithm is implemented in C/C++ programming language and tested. Finally, a concurrent team tries to break the algorithm by finding the decryption key. It is an interactive approach which combines various education methods including gaming concepts. The covered topics provide students professional outcomes such as knowledge and use of specific mathematical tools and software environments (C/C ++ programming languages, MATLAB, abilities to design, develop, implement and test software algorithms. The project also provides transversal outcomes such as ability to team work, skills of computer use and information technology and capability to take responsibilities. Creativity is also encouraged by extending the algorithm to other encryption key lengths than the usual ones.

  11. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  12. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  13. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  14. Initial evaluation of the effects of an environmental-focused problem-solving intervention for transition-age young people with developmental disabilities: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica M; Helfrich, Christine; Levin, Melissa; Hwang, I-Ting; Samuel, Preethy S; Carrellas, Ann; Schwartz, Ariel E; Goeva, Aleksandrina; Kolaczyk, Eric D

    2018-03-12

    Project TEAM (Teens making Environment and Activity Modifications) teaches transition-age young people with developmental disabilities, including those with co-occurring intellectual or cognitive disabilities, to identify and resolve environmental barriers to participation. We examined its effects on young people's attainment of participation goals, knowledge, problem-solving, self-determination, and self-efficacy. We used a quasi-experimental, repeated measures design (initial, outcome, 6-week follow-up) with two groups: (1) Project TEAM (28 males, 19 females; mean age 17y 6mo); and (2) goal-setting comparison (21 males, 14 females; mean age 17y 6mo). A matched convenience sample was recruited in two US states. Attainment of participation goals and goal attainment scaling (GAS) T scores were compared at outcome. Differences between groups for all other outcomes were analyzed using linear mixed effects models. At outcome, Project TEAM participants demonstrated greater knowledge (estimated mean difference: 1.82; confidence interval [CI]: 0.90, 2.74) and ability to apply knowledge during participation (GAS: t[75]=4.21; CI: 5.21, 14.57) compared to goal-setting. While both groups achieved significant improvements in knowledge, problem-solving, and self-determination, increases in parent reported self-determination remained at 6-week follow-up only for Project TEAM (estimated mean difference: 4.65; CI: 1.32, 7.98). Significantly more Project TEAM participants attained their participation goals by follow-up (Project TEAM=97.6%, goal-setting=77.1%, p=0.009). Both approaches support attainment of participation goals. Although inconclusive, Project TEAM may uniquely support young people with developmental disabilities to act in a self-determined manner and apply an environmental problem-solving approach over time. Individualized goal-setting, alone or during Project TEAM (Teens making Environment and Activity Modifications) appears to support attainment of participation

  15. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  16. Together Achieving More: Primary Care Team Communication and Alcohol-Related Healthcare Utilization and Costs.

    Science.gov (United States)

    Mundt, Marlon P; Zakletskaia, Larissa I; Shoham, David A; Tuan, Wen-Jan; Carayon, Pascale

    2015-10-01

    Identifying and engaging excessive alcohol users in primary care may be an effective way to improve patient health outcomes, reduce alcohol-related acute care events, and lower costs. Little is known about what structures of primary care team communication are associated with alcohol-related patient outcomes. Using a sociometric survey of primary care clinic communication, this study evaluated the relation between team communication networks and alcohol-related utilization of care and costs. Between May 2013 and December 2013, a total of 155 healthcare employees at 6 primary care clinics participated in a survey on team communication. Three-level hierarchical modeling evaluated the link between connectedness within the care team and the number of alcohol-related emergency department visits, hospital days, and associated medical care costs in the past 12 months for each team's primary care patient panel. Teams (n = 31) whose registered nurses displayed more strong (at least daily) face-to-face ties and strong (at least daily) electronic communication ties had 10% fewer alcohol-related hospital days (rate ratio [RR] = 0.90; 95% confidence interval [CI]: 0.84, 0.97). Furthermore, in an average team size of 19, each additional team member with strong interaction ties across the whole team was associated with $1,030 (95% CI: -$1,819, -$241) lower alcohol-related patient healthcare costs per 1,000 team patients in the past 12 months. Conversely, teams whose primary care practitioner (PCP) had more strong face-to-face communication ties and more weak (weekly or several times a week) electronic communication ties had 12% more alcohol-related hospital days (RR = 1.12; 95% CI: 1.03, 1.23) and $1,428 (95% CI: $378, $2,478) higher alcohol-related healthcare costs per 1,000 patients in the past 12 months. The analyses controlled for patient age, gender, insurance, and comorbidity diagnoses. Excessive alcohol-using patients may fair better if cared for by teams whose

  17. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    relationship. Foci for future research opportunities include using: a) online data collection methods to improve participant adherence to similarity rating instructions; b) story or narratives during pre- and posttest similarity rating data collection to create common levels of contextual perception; and c) support to ensure charters are integrated into the full project life cycle, not just a pre-project one time isolated activity. Twenty five sections, on average, of EDSGN 100 are taught each spring and fall semester. Consistent instructor expectations are set for the technical aspects of the course. However, ideas to foster team effectiveness are often left to the discretion of the individual instructor. Implementing empirically tested team effectiveness instructional activities would bring consistency to EDGSN 100 curriculum. Other instructional activities that would be of benefit to engineering educators include qualitative inquiry---asking intrateam process questions (at the mid-point of the project) and in-class reflection---dedicated time, post project, to discuss what went well/not well within the team.

  18. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  19. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  20. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  1. The link class project : Collaborative virtual teams between Peru and The Netherlands

    NARCIS (Netherlands)

    Olivos Rossini, L.M.; Rincon, Sandra; Rutkowski, Anne-Francoise

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the

  2. Embedding Systems Thinking into EWB Project Planning and Development: Assessing the Utility of a Group Model Building Approach

    Directory of Open Access Journals (Sweden)

    Kimberly Pugel

    2017-11-01

    Full Text Available Amongst growing sociotechnical efforts, engineering students and professionals both in the international development sector and industry are challenged to approach projects more holistically to achieve project goals.  Engineering service learning organizations must similarly adapt their technological projects to consider varying cultural and economic structures, ensuring more resilient social progress within development efforts.  In practice, systems thinking approaches can be utilized to model the social, economic, political, and technological implications that influence the sustainability of an engineering project. This research assesses the utility of integrating systems thinking into Engineers Without Borders (EWB project planning and development, thereby improving project impact and more effectively engaging members.  At a workshop held at an EWB-USA 2016 Regional Conference, the authors presented a planning and evaluation framework that applies group model building with system dynamics to foster systems thinking through factor diagramming and analysis. To assess the added value of the framework for EWB project planning and development, extensive participant feedback was gathered and evaluated during the workshop and through an optional post-workshop survey.  Supported by thoughtful observations and feedback provided by the EWB members, the model building workshop appeared to help participants reveal and consider project complexities by both visually and quantitatively identifying key non-technical and technical factors that influence project sustainability.  Therefore, system dynamics applied in a group model building workshop offers a powerful supplement to traditional EWB project planning and assessment activities, providing a systems-based tool for EWB teams and partner communities to build capacity and create lasting change.

  3. Project work on wellbeing in multidisciplinary student teams : A triple testimonial on eps at artesis

    NARCIS (Netherlands)

    Rohaert, S.; Baelus, C.; Lacko, D.

    2012-01-01

    The European Project Semester (EPS) programme offers an educational framework to support students to practice problem-and project-based cross-disciplinary product innovation and research, in small multidisciplinary and international teams. To explore the potential and the restrictions of this

  4. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  5. Project team formation support for self-directed learners in social learning networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2012-01-01

    Spoelstra, H., Van Rosmalen, P., & Sloep, P. B. (2012). Project team formation support for self-directed learners in social learning networks. In P. Kommers, P. Isaias, & N. Bessis (Eds.), Proceedings of the IADIS International Conference on Web Based Communities and Social Media (ICWBC & SM 2012)

  6. Healthcare Cost and Utilization Project (HCUP)

    Science.gov (United States)

    The Healthcare Cost and Utilization Project is a family of health care databases and related software tools and products developed through a Federal-State-Industry partnership and sponsored by the Agency for Healthcare Research and Quality.

  7. Librarians as Part of Cross-Disciplinary, Multi-Institutional Team Projects: Experiences from the VIVO Collaboration

    Science.gov (United States)

    Garcia-Milian, Rolando; Norton, Hannah F.; Auten, Beth; Davis, Valrie I.; Holmes, Kristi L.; Johnson, Margeaux; Tennant, Michele R.

    2013-01-01

    Cross-disciplinary, team-based collaboration is essential for addressing today’s complex research questions, and librarians are increasingly entering into such collaborations. This study identifies skills needed as librarians integrate into cross-disciplinary teams, based on the experiences of librarians involved in the development and implementation of VIVO, a research discovery and collaboration platform. Participants discussed the challenges, skills gained, and lessons learned throughout the project. Their responses were analyzed in the light of the science of team science literature, and factors affecting collaboration on the VIVO team were identified. Skills in inclusive thinking, communication, perseverance, adaptability, and leadership were found to be essential. PMID:23833333

  8. Chinese Manned Space Utility Project

    Science.gov (United States)

    Gu, Y.

    Since 1992 China has been carrying out a conspicuous manned space mission A utility project has been defined and created during the same period The Utility Project of the Chinese Manned Space Mission involves wide science areas such as earth observation life science micro-gravity fluid physics and material science astronomy space environment etc In the earth observation area it is focused on the changes of global environments and relevant exploration technologies A Middle Revolution Image Spectrometer and a Multi-model Micro-wave Remote Sensor have been developed The detectors for cirrostratus distribution solar constant earth emission budget earth-atmosphere ultra-violet spectrum and flux have been manufactured and tested All of above equipment was engaged in orbital experiments on-board the Shenzhou series spacecrafts Space life science biotechnologies and micro-gravity science were much concerned with the project A series of experiments has been made both in ground laboratories and spacecraft capsules The environmental effect in different biological bodies in space protein crystallization electrical cell-fusion animal cells cultural research on separation by using free-low electrophoresis a liquid drop Marangoni migration experiment under micro-gravity as well as a set of crystal growth and metal processing was successfully operated in space The Gamma-ray burst and high-energy emission from solar flares have been explored A set of particle detectors and a mass spectrometer measured

  9. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  10. TEAM-UP PV-friendly pricing projects: Validation of market research and market development

    International Nuclear Information System (INIS)

    Bigger, J.E.; Hester, S.L.

    1997-01-01

    More than two dozen electric utilities in the US have initiated renewable energy programs funded in total or in part by customers willing to pay a premium to either have their utility develop and use renewable technologies or have part of their own electric service needs supplied by renewable energy sources. These programs are beginning to answer key questions regarding the numbers and characteristics of customers that are willing to pay these premiums for clean, nonpolluting energy. Also, economic viability, level of revenue support, and other questions are critical to successful programs. This paper provides information on a number of utility efforts now underway which use photovoltaic (PV) systems and are part of the government-utility industry TEAM-UP program; it will also provide some early findings and perspectives that are coming from these utility efforts around the US

  11. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Directory of Open Access Journals (Sweden)

    Núria Rovira-Asenjo

    Full Text Available Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering. So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4-5 members. Each team was headed by either a female or male leader, so that 45 leaders (33% women supervised 258 team members (39% women. Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders' self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration. While we did not find any gender differences in leaders' self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders.

  12. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Science.gov (United States)

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  13. Effects of interdependencies in project teams

    NARCIS (Netherlands)

    Van der Vegt, G.S.; Emans, B.J.M.; Van de Vliert, E.

    The associations between task interdependence, outcome interdependence, and the effectiveness of team members were examined. The sample consisted of 181 employees at 10 engineering companies in The Netherlands. The participants evaluated their interdependence with 1 specific team member and rated

  14. Annunciation - building product team capabilities to support utility operational improvement

    International Nuclear Information System (INIS)

    Doucet, R.; Brown, R.; Trask, D.; Leger, R.; Mitchel, G.; Judd, R.; Davey, E.

    2003-01-01

    The purpose of this paper is to describe an AECL initiative to enhance the capabilities to assist utilities with undertaking annunciation improvement. This initiative was undertaken to complement a recent annunciation product upgrade, and in anticipation of developing commercial opportunities to assist Canadian and foreign utilities with control room annunciation improvement. Utilities are relying more and more on external engineering product and service providers to meet their plant support needs as they reduce in-house staffing to lower ongoing support costs. This evolving commercial environment places new demands on product and service providers, and provides new opportunities for increasing the proportion of product and service provider participation in plant improvement projects. This paper outlines recent AECL experience in the annunciation product area. The paper discusses the rationale for product support capability improvement, discusses the approaches undertaken, describes lessons learned, and outlines a proposed utility support model for assisting with future annunciation improvements. (author)

  15. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  16. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  17. Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams

    NARCIS (Netherlands)

    Rusman, Ellen; Van Bruggen, Jan; Sloep, Peter; Valcke, Martin; Koper, Rob

    2010-01-01

    Rusman, E., Van Bruggen, J., Sloep, P. B., Valcke, M., & Koper, R. (2012). Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams. International Journal of Information Technology Project Management (IJITPM), 3(1), 15-35.

  18. Beautiful Teams Inspiring and Cautionary Tales from Veteran Team Leaders

    CERN Document Server

    Stellman, Andrew

    2009-01-01

    What's it like to work on a great software development team facing an impossible problem? How do you build an effective team? Beautiful Teams takes you behind the scenes with some of the most interesting teams in software engineering history. You'll learn from veteran team leaders' successes and failures, told through a series of engaging personal stories -- and interviews -- by leading programmers, architects, project managers, and thought leaders.

  19. Guide for monitoring effectiveness of utility Reliability Centered Maintenance (RCM) programs

    International Nuclear Information System (INIS)

    Midgett, W.D.; Wilson, J.F.; Krochmal, D.F.; Owsenek, L.W.

    1991-02-01

    Reliability centered maintenance (RCM) programs help utilities optimize preventive maintenance efforts while improving plant safety and economy through increased dependability of plant components. The project team developed this guide and accompanying methodology based on status updates from the Ginna and San Onofre demonstration projects. These updates addressed areas ranging from system selection to the effectiveness of RCM program implementation. In addition, the team incorporated information from a 12-utility survey soliciting opinions on the need for a methodology to monitor RCM cost-effectiveness. An analysis of the 12-utility survey showed that no techniques had been developed to measure RCM program cost-effectiveness. Thus, this guide addresses two key areas: Pros and cons of various monitoring techniques available to assess the overall effectiveness of RCM and a methodology for specifically evaluating the cost-effectiveness of RCM programs. 1 fig

  20. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  1. One step ahead of technology Cern and HP - an ideal team project

    CERN Multimedia

    Garvey, Kelsey

    2009-01-01

    "In 2004, the It team at Cern recognized the comprehensiveness and future of the LHC Computing Grid Project and realized that the IT infrastructures were not sufficient enough to manage the data. Cern therefore partnered with HP ProCurve the following year to minimize the day-to-day workload and improve infrastructure for data output" (1 page)

  2. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  3. Knowledge Utilization in Projects – a Practice-based

    DEFF Research Database (Denmark)

    Thuesen, Christian

    Drawing upon Practice-based theorizing in general and Actor Network Theory and theories of Communities of Practices in particular the paper develops an analytical strategy for understanding “life” in projects. The analytical strategy is applied on empirical material from an 18-month ethnographic...... study of a construction project. The project is interpreted as constellation of networked practices, which always is in the making. Participation in this project is a learning process where existing practices are reproduced and developed. This understanding of “life” in the project, frames a concluding...... analysis and discussion of the utilization of knowledge in the project....

  4. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  5. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  6. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  7. Team Building: Proven Strategies for Improving Team Performance, 4th Edition”

    Directory of Open Access Journals (Sweden)

    Greg Homan

    2008-12-01

    Full Text Available Team Building is an important issue for Youth Development professionals. We utilize team-focused work to achieve our objectives in educating youth. The team building skills we integrate into programming serve to prepare youth for the dynamic, highly interpersonal work environment of today. “Team Building: Proven Strategies for Improving Team Performance, 4th Edition,” by W. Dyer, W.G. Dyer, and J. Dyer (2007, provides a practical theoretical framework for those interested in team building application, training, and practice in everyday work.

  8. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  9. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  10. Learning to Argue with Intermediate Macro Theory: A Semester-Long Team Writing Project

    Science.gov (United States)

    Strasser, Georg; Wolfe, Marketa Halova

    2014-01-01

    The authors describe their experience with integrating a semester-long economic analysis project into an intermediate macroeconomic theory course. Students work in teams of "economic advisors" to write a series of nested reports that analyze the current state of the economy, and propose and evaluate policies for a decision-maker. The…

  11. White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Paul T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bass, Bennett Richard [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-09-01

    ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the

  12. NREL/SCE High Penetration PV Integration Project: FY13 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Mather, B. A.; Shah, S.; Norris, B. L.; Dise, J. H.; Yu, L.; Paradis, D.; Katiraei, F.; Seguin, R.; Costyk, D.; Woyak, J.; Jung, J.; Russell, K.; Broadwater, R.

    2014-06-01

    In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

  13. Integrated waste hydrogen utilization project

    International Nuclear Information System (INIS)

    Armstrong, C.

    2004-01-01

    'Full text:' The BC Hydrogen Highway's, Integrated Waste Hydrogen Utilization Project (IWHUP) is a multi-faceted, synergistic collaboration that will capture waste hydrogen and promote its use through the demonstration of 'Hydrogen Economy' enabling technologies developed by Canadian companies. IWHUP involves capturing and purifying a small portion of the 600 kg/hr of by-product hydrogen vented to the atmosphere at the ERCO's electrochemical sodium chlorate plant in North Vancouver, BC. The captured hydrogen will then be compressed so it is suitable for transportation on roadways and can be used as a fuel in transportation and stationary fuel cell demonstrations. In summary, IWHUP invests in the following; Facilities to produce up to 20kg/hr of 99.999% pure 6250psig hydrogen using QuestAir's leading edge Pressure Swing Absorption technology; Ultra high-pressure transportable hydrogen storage systems developed by Dynetek Industries, Powertech Labs and Sacre-Davey Engineering; A Mobile Hydrogen Fuelling Station to create Instant Hydrogen Infrastructure for light-duty vehicles; Natural gas and hydrogen (H-CNG) blending and compression facilities by Clean Energy for fueling heavy-duty vehicles; Ten hydrogen, internal combustion engine (H-ICE), powered light duty pick-up vehicles and a specialized vehicle training, maintenance, and emissions monitoring program with BC Hydro, GVRD and the District of North Vancouver; The demonstration of Westport's H-CNG technology for heavy-duty vehicles in conjunction with local transit properties and a specialized vehicle training, maintenance, and emissions monitoring program; The demonstration of stationary fuel cell systems that will provide clean power for reducing peak-load power demands (peak shaving), grid independence and water heating; A comprehensive communications and outreach program designed to educate stakeholders, the public, regulatory bodies and emergency response teams in the local community, Supported by industry

  14. Wind farm projects as joint ventures between a Danish utility and private cooperatives

    International Nuclear Information System (INIS)

    Moerup-Petersen, V.; Pedersen, S.

    1992-01-01

    Four cases on successful cooperation between the Danish utility, NESA A/S, and private wind cooperatives are described. In two cases the utility was invited to share the projects prepared by the cooperatives. In the third case the project was developed by the utility. The fourth and most ambitious project, where construction work is just about to start, both parties are involved on a 50/50 basis. The experience gained from the different projects is described. The paper discusses the advantages and disadvantages of joint projects for both parties. Different models on cooperation are outlined. Mainly based on NESA's experience, the joint concept is recommended by the Danish Ministry of Environment. The aim is to get the optimal utilization of the limited siting possibilities in Denmark. The future perspectives of joint projects are anticipated. (au)

  15. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  16. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  17. Team role stress : relationships with team learning and performance in project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Gevers, J.M.P.; Heijden, van der B.I.J.M.; Poell, R.F.

    2012-01-01

    Although role stress literature has almost exclusively focused on individual role incumbents, it is conceivable that shared conditions of ambiguity, conflict, and quantitative or qualitative overload may give rise to a collective experience of role stress in teams. Testing a multilevel mediation

  18. Working with teams of "insiders": Qualitative approaches to data collection in the Global South

    Directory of Open Access Journals (Sweden)

    Enid Schatz

    2015-02-01

    Full Text Available Background: The convergence of two qualitative methodological strategies - working in "teams" and with "insiders" - can facilitate access, efficiency, and insights into research questions of interest to demographers. Even though this approach is becoming more common among population researchers in the Global South to address a range of research questions, little has been published that describes the method and critically assesses its strengths and weaknesses. Objective: We draw on three projects embedded in the Agincourt Health and Socio-Demographic Surveillance System site in rural South Africa that integrate both approaches to demonstrate the benefits and limitations of this strategy. Methods: We document, through in-depth description, how these three projects achieve access, efficiency, and insights into issues of population concern (HIV/AIDS, aging, and child wellbeing utilizing a "team-insider" approach by working with groups of local research assistants. Conclusions: The projects vary in their use of "teams" and "insiders" but collectively deepen our understanding of pressing population concerns in the Global South. In particular, by using teams of insiders, these projects gain insights into local ideas about HIV, uncover ways that HIV affects older women's lives, and provide in-depth understanding of children's social connections. The approach also presents a number of challenges, however, such as grappling with the responsibilities and burdens that are placed on local insider team members.

  19. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  20. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  1. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  2. Decision making in a multidisciplinary cancer team: does team discussion result in better quality decisions?

    Science.gov (United States)

    Kee, Frank; Owen, Tracy; Leathem, Ruth

    2004-01-01

    To establish whether treatment recommendations made by clinicians concur with the best outcomes predicted from their prognostic estimates and whether team discussion improves the quality or outcome of their decision making, the authors studied real-time decision making by a lung cancer team. Clinicians completed pre- and postdiscussion questionnaires for 50 newly diagnosed patients. For each patient/doctor pairing, a decision model determined the expected patient outcomes from the clinician's prognostic estimates. The difference between the expected utility of the recommended treatment and the maximum utility derived from the clinician's predictions of the outcomes (the net utility loss) following all potential treatment modalities was calculated as an indicator of quality of the decision. The proportion of treatment decisions changed by the multidisciplinary team discussion was also calculated. Insofar as the change in net utility loss brought about by multidisciplinary team discussion was not significantly different from zero, team discussion did not improve the quality of decision making overall. However, given the modest power of the study, these findings must be interpreted with caution. In only 23 of 87 instances (26%) in which an individual specialist's initial treatment preference differed from the final group judgment did the specialist finally concur with the group treatment choice after discussion. This study does not support the theory that team discussion improves decision making by closing a knowledge gap.

  3. The Link Class Project: Collaborative virtual teams between Peru and The Netherlands

    OpenAIRE

    Mariella Olivos Rossini; Sandra Rincón; Anne-Francoise Rutkowski

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the effects of a campus based internationalization strategy supported by the use of technology. Based on previous experiences with virtual classrooms, the authors adhere to the ancient Chinese philosophe...

  4. Developing Your Dream Team

    Science.gov (United States)

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  5. The Motivated Project Team

    Science.gov (United States)

    2009-12-01

    Financial incentives that match level of achievement • Regular, constructive feedback. Hierarchy of Needs ( Abraham H. Maslow ) Team members can be...Much has been written regarding motivational Defense AT&L: November-December 2009 58 theory . To further complicate mat- ters, some motivational... theories clearly contradict others, and a manager’s ability to motivate is, to no small degree, related to his or her leadership approach and inter

  6. Activities of electric utilities in alternative energy projects

    International Nuclear Information System (INIS)

    Silva, D.B. da; Reis Neto, J.L. dos

    1990-01-01

    Since oil crisis, in 1973 and 1979, some electrical utilities in Brazil begun investments in alternative projects for example production of electrolytic hydrogen, peats with energetics goals, steam from electric boiler, and methanol from wood gasification. With oil substitution goals, these projects have not success actually, after attenuated the crisis. However, the results acquired is experience for the development of the brazilian energy patterns. (author)

  7. Interest in smart metering project surprises utility, IBM

    International Nuclear Information System (INIS)

    Horne, D.

    2006-01-01

    This article provided an outline of Hydro Ottawa and IBM's smart metering pilot project, which has resulted in high approval ratings from the public. The project features 375 participants broken down into 3 separate groups to look for potential consumption differences between customers charged according to standard time-of-use pricing; time-of-use with critical peak pricing; and time-of-use with critical peak rebates. The Ontario Smart Price Pilot project will be run for 5 months, and is expected to provide detailed energy information about usage. Past projects have indicated that customers respond quickly to smart metering, as they are able to monitor their energy usage and more effectively manage their energy consumption. Ontario plans to have all homes and small businesses using smart meters by 2010, as high seasonal demand has indicated that conservation and balanced resource use are now top priorities for many utility companies. At least 10 states in the United States have conducted smart metering pilot projects. The California Public Utilities Commissions has recently approved a $1.7 billion statewide plan to replace old meters with smart meters. In Ontario, customers have ordered 10,000 electricity monitors that Hydro One is giving away. It was concluded that research results from an earlier Hydro One demonstration project with 500 Ontario homeowners showed that real time electricity monitors can help homeowners reduce their consumption of electricity by up to 15 per cent. 4 figs

  8. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  9. Model of Team Organization and Behavior and Team Description Method

    Science.gov (United States)

    1984-10-01

    PERFORMING ORG& REPORT’ NUMBER 7.AUTHIOR(&) 0. CONTRACT OR GRANT NUMOSR(ej J. Thomas Roth Rohn J. Hritz HDA 903-81-C-0198: VEa Donald W. McGill 9...team descriptions are included, acid procedures for data recording are provided. 4q-4 4 iv, G OP S• . . • ,," $1 . . ’ __ _ _ _ ’ / . • , Utilization...Listing of thi! number acid identification of the roles adopted by team members in the actual team structure, along with KOS and primary equipment

  10. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  11. Team-client Relationships And Extreme Programming

    Directory of Open Access Journals (Sweden)

    John Karn

    2008-01-01

    Full Text Available This paper describes a study that examined the relationship between software engineering teams who adhered to the extreme programming (XP methodology and their project clients. The study involved observing teams working on projects for clients who had commissioned a piece of software to be used in the real world. Interviews were conducted during and at the end of the project to get client opinion on how the project had progressed. Of interest to the researchers were opinions on frequency of feedback, how the team captured requirements, whether or not the iterative approach of XP proved to be helpful, and the level of contextual and software engineering knowledge the client had at the start of the project. In theory, fidelity to XP should result in enhanced communication, reduce expectation gaps, and lead to greater client satisfaction. Our results suggest that this depends heavily on the communication skills of the team and of the client, the expectations of the client, and the nature of the project.

  12. Nuclear Nonproliferation Ontology Assessment Team Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strasburg, Jana D.; Hohimer, Ryan E.

    2012-01-01

    Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

  13. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  14. Structuring Effective Student Teams.

    Science.gov (United States)

    Dickson, Ellen L.

    1997-01-01

    Experience with student teams working on policy analysis projects indicates the need for faculty supervision of teams in the process of addressing complex issues. The problem-solving approach adopted in one policy analysis course is described, including assignments and tasks, issues and sponsors, team dynamics, conflict management, and the…

  15. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  16. Development of an Integrated Team Training Design and Assessment Architecture to Support Adaptability in Healthcare Teams

    Science.gov (United States)

    2017-10-01

    provision of training is not a major focus of this project, trainees were able to practice trauma management skills as well as leadership skills...SUBJECT TERMS Military healthcare team; Trauma teams; Team training; Teamwork; Adaptive performance; Leadership ; Simulation; Modeling; Bayesian belief...ABBREVIATIONS Healthcare team Trauma Trauma teams Team training Teamwork Adaptability Adaptive performance Leadership Simulation Modeling

  17. Balancing creativity and time efficiency in multi-team R&D projects : the alignment of formal and informal networks

    NARCIS (Netherlands)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    The business world is denoted by an increasing number of multi-team research and development (R&D) projects, however, managerial knowledge about how to run them successfully is scarce. The present study attempts to shed light at this kind of projects by investigating the alignment of formal and

  18. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  19. When Teams Go Crazy

    DEFF Research Database (Denmark)

    Kuhrmann, Marco; Münch, Jürgen

    2016-01-01

    Software development consists to a large extend of human-based processes with continuously increasing demands regarding interdisciplinary team work. Understanding the dynamics of software teams can be seen as highly important to successful project execution. Hence, for future project managers......, knowledge about non-technical processes in teams is significant. In this paper, we present a course unit that provides an environment in which students can learn and experience the impact of group dynamics on project performance and quality. The course unit uses the Tuckman model as theoretical framework......, and borrows from controlled experiments to organize and implement its practical parts in which students then experience the effects of, e.g., time pressure, resource bottlenecks, staff turnover, loss of key personnel, and other stress factors. We provide a detailed design of the course unit to allow...

  20. Performance of Student Software Development Teams: The Influence of Personality and Identifying as Team Members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms…

  1. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    or pre-arranged at random. Therefore we investigate the importance of team formation in the entrepreneurial classroom and ask: (i) What are the underlying factors that influence outcomes of teamwork in student groups? (ii) How does team formation influence student perception of learning?, and (iii) Do...... different team formation strategies produce different teamwork and learning outcomes? Approach: We employed a multiple case study design comprising of 38 student teams to uncover potential links between team formation and student perception of learning. This research draws on data from three different....... A rigorous coding and inductive analysis process was undertaken. Pattern and relationship coding were used to reveal underlying factors, which helped to unveil important similarities and differences between student in different teams’ project progress and perception of learning. Results: When students...

  2. Community Solar Value Project

    Energy Technology Data Exchange (ETDEWEB)

    Powers, John T [Extensible Energy; Cliburn, Jill [Cliburn and Associates

    2017-11-30

    The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost

  3. Solar energy grid integration systems : final report of the Florida Solar Energy Center Team.

    Energy Technology Data Exchange (ETDEWEB)

    Ropp, Michael (Northern Plains Power Technologies, Brookings, SD); Gonzalez, Sigifredo; Schaffer, Alan (Lakeland Electric Utilities, Lakeland, FL); Katz, Stanley (Satcon Technology Corporation, Boston, MA); Perkinson, Jim (Satcon Technology Corporation, Boston, MA); Bower, Ward Isaac; Prestero, Mark (Satcon Technology Corporation, Boston, MA); Casey, Leo (Satcon Technology Corporation, Boston, MA); Moaveni, Houtan (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Click, David (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Davis, Kristopher (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Reedy, Robert (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Kuszmaul, Scott S.; Sena-Henderson, Lisa; David, Carolyn; Akhil, Abbas Ali

    2012-03-01

    Initiated in 2008, the Solar Energy Grid Integration Systems (SEGIS) program is a partnership involving the U.S. DOE, Sandia National Laboratories, private sector companies, electric utilities, and universities. Projects supported under the program have focused on the complete-system development of solar technologies, with the dual goal of expanding utility-scale penetration and addressing new challenges of connecting large-scale solar installations in higher penetrations to the electric grid. The Florida Solar Energy Center (FSEC), its partners, and Sandia National Laboratories have successfully collaborated to complete the work under the third and final stage of the SEGIS initiative. The SEGIS program was a three-year, three-stage project that include conceptual design and market analysis in Stage 1, prototype development and testing in Stage 2, and moving toward commercialization in Stage 3. Under this program, the FSEC SEGIS team developed a comprehensive vision that has guided technology development that sets one methodology for merging photovoltaic (PV) and smart-grid technologies. The FSEC team's objective in the SEGIS project is to remove barriers to large-scale general integration of PV and to enhance the value proposition of photovoltaic energy by enabling PV to act as much as possible as if it were at the very least equivalent to a conventional utility power plant. It was immediately apparent that the advanced power electronics of these advanced inverters will go far beyond conventional power plants, making high penetrations of PV not just acceptable, but desirable. This report summarizes a three-year effort to develop, validate and commercialize Grid-Smart Inverters for wider photovoltaic utilization, particularly in the utility sector.

  4. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  5. Factors Contributing to Research Team Effectiveness: Testing a Model of Team Effectiveness in an Academic Setting

    Science.gov (United States)

    Omar, Zoharah; Ahmad, Aminah

    2014-01-01

    Following the classic systems model of inputs, processes, and outputs, this study examined the influence of three input factors, team climate, work overload, and team leadership, on research project team effectiveness as measured by publication productivity, team member satisfaction, and job frustration. This study also examined the mediating…

  6. A conceptual model to improve performance in virtual teams

    Directory of Open Access Journals (Sweden)

    Shopee Dube

    2016-09-01

    Full Text Available Background: The vast improvement in communication technologies and sophisticated project management tools, methods and techniques has allowed geographically and culturally diverse groups to operate and function in a virtual environment. To succeed in this virtual environment where time and space are becoming increasingly irrelevant, organisations must define new ways of implementing initiatives. This virtual environment phenomenon has brought about the formation of virtual project teams that allow organisations to harness the skills and knowhow of the best resources, irrespective of their location. Objectives: The aim of this article was to investigate performance criteria and develop a conceptual model which can be applied to enhance the success of virtual project teams. There are no clear guidelines of the performance criteria in managing virtual project teams. Method: A qualitative research methodology was used in this article. The purpose of content analysis was to explore the literature to understand the concept of performance in virtual project teams and to summarise the findings of the literature reviewed. Results: The research identified a set of performance criteria for the virtual project teams as follows: leadership, trust, communication, team cooperation, reliability, motivation, comfort and social interaction. These were used to conceptualise the model. Conclusion: The conceptual model can be used in a holistic way to determine the overall performance of the virtual project team, but each factor can be analysed individually to determine the impact on the overall performance. The knowledge of performance criteria for virtual project teams could aid project managers in enhancing the success of these teams and taking a different approach to better manage and coordinate them.

  7. Uncovering Transdisciplinary Team Project Outcomes through Ripple Effect Mapping

    Science.gov (United States)

    Daniels, Catherine H.; Chalker-Scott, Linda; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary, geographically dispersed group of faculty and staff. As with many such teams, member retention requires effort, as busy individuals may not see the overall benefits of active team membership. Ripple effect mapping is a strategy that can illustrate the tangible and often…

  8. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  9. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  10. Exploring Parental Involvement Strategies Utilized by Middle School Interdisciplinary Teams

    Science.gov (United States)

    Robbins, Chris; Searby, Linda

    2013-01-01

    Adolescents present a unique collection of characteristics and challenges which middle school interdisciplinary teams were designed to address. This article describes a research study which explored parental involvement strategies employed by interdisciplinary teaching teams from three very different middle schools: an affluent suburban school, a…

  11. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    Science.gov (United States)

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  12. Task versus relationship conflict, team performance, and team member satisfaction: a meta-analysis.

    Science.gov (United States)

    De Dreu, Carsten K W; Weingart, Laurie R

    2003-08-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, results revealed strong and negative correlations between relationship conflict, team performance, and team member satisfaction. In contrast to what has been suggested in both academic research and introductory textbooks, however, results also revealed strong and negative (instead of the predicted positive) correlations between task conflict team performance, and team member satisfaction. As predicted, conflict had stronger negative relations with team performance in highly complex (decision making, project, mixed) than in less complex (production) tasks. Finally, task conflict was less negatively related to team performance when task conflict and relationship conflict were weakly, rather than strongly, correlated.

  13. Service-provider and utility task-leadership integration. Paper D

    International Nuclear Information System (INIS)

    Bagshaw, S.; Van Tassell, D.

    2011-01-01

    As nuclear power utilities strive to stream-line their organizations, while improving outage and refurbishment project performance, the necessity for effective relationships and interaction between utility and service-providers becomes paramount. Successful integration of Service-Provider into the Utility's environment is achievable and has been demonstrated. Early and extensive engagement in front-end planning, single-point-of-continuity, and the use of integrated execution teams, are some of the critical elements for ensuring success. The paper discusses Task-Leadership Integration at the three levels of; utility executive level 'need-statement'; a 'why is this important' discussion; and as a 'thoughtful tutorial' on its features and practice. (author)

  14. 24 CFR 245.416 - Initial submission of materials to HUD: Conversion from project-paid utilities to tenant-paid...

    Science.gov (United States)

    2010-04-01

    ... projects, and utility rate information, as obtained from the utility supplier; (iv) The estimated monthly... HUD: Conversion from project-paid utilities to tenant-paid utilities or a reduction in tenant utility... AUTHORITIES TENANT PARTICIPATION IN MULTIFAMILY HOUSING PROJECTS Procedures for Requesting Approval of a...

  15. The Interactive Role of Temporal Team Leadership in the Telecom Sector of Pakistan: Utilizing Temporal Diversity for Sustainable Knowledge Sharing

    Directory of Open Access Journals (Sweden)

    Usama Najam

    2018-04-01

    Full Text Available Human or social dimensions need to be significantly considered to maintain organizational sustainability. Unfortunately, this aspect has received relatively little attention when compared to other dimensions of sustainability. This study promotes the presence of a leader to manage conflicts, which cause hindrances in achieving sustainability. This is possible by maximizing sustainable knowledge sharing in a team, by effectively utilizing temporal diversity, including time urgency, time perspective, and pacing style diversity under a certain time pressure. This study has examined the effect of temporal diversity on knowledge sharing within teams by taking temporal conflict as a mediator. Moreover, it was also investigated whether the role of team temporal leadership is effective in utilizing the conflicts arising from the temporal diversity. The research design was quantitative in nature. A purposive sampling technique was used to gather data from 100 dyads working in the telecom sector of Pakistan, by distributing questionnaires. The findings suggest that team temporal leadership plays an effective role when a conflict arises rather than after it has arisen because more time and resources will be required to resolve such conflicts arising from temporal diversity. When the temporal diversity is low, the leader can manage the conflicts quite well, but as the diversity increases, the role of the temporal leader become much harder which may cause increased conflicts because of the limited capacity of a leader to manage those conflicts. Furthermore, it was observed that conflicts, if managed properly, may lead to increased knowledge sharing.

  16. Improving Scientific Research Methodology in Undergraduate Medical Students: a case of team based training blended in a research project

    Institute of Scientific and Technical Information of China (English)

    W.Zhang; C.Cambier; Y.Zhang; J.M.Vandeweerd; P.Gustin

    2014-01-01

    An educational intervention targeting medical students and aiming to develop skills useful to the writing of a health science research protocol over a short period of time has been developed in the Shanghai Jiao Tong University School of Medicine. The methodology blending the principles of PBL and TBL is detailed and key issues of this implementation are discussed. Twenty-one students were enrolled in a research master degree and participated to three mandatory 180-minutes sessions. Beyond classical skills useful to solve a problem, this new intervention focused on the transformation of knowledge to create an authentic content, which is a feature of the project-based learning(PBL). The training process was designed according to team-based learning(TBL) procedure except that work sharing between groups and pooling resources and outcomes of each group allowed the construction of one final class original research project in the field of respiratory pharmacology. The combination of both learning methods allowed promoting individual and group accountability necessary to improve self-learning and the quality of the final joint project. The peer reviewing was an essential factor in creating the students’ motivation and improving of team discussion. The grades individually assigned for skills and quality of the project by an external teacher suggested that key objectives of the intervention were reached. In conclusion, the educational intervention described in this paper appears as an appropriate method to develop specific skills necessary to write and discuss a research project within a research team.Further works are necessary to measure the degree of satisfaction of students and improvement of performance.

  17. Final Report Report: Smart Grid Ready PV Inverters with Utility Communication

    Energy Technology Data Exchange (ETDEWEB)

    Seal, Brian [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Huque, Aminul [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Rogers, Lindsey [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Key, Tom [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Riley, Cameron [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Li, Huijuan [Electric Power Research Inst. (EPRI), Knovville, TN (United States); York, Ben [Electric Power Research Inst. (EPRI), Knovville, TN (United States); Purcell, Chris [BPL Global, Inc., Canonsburg, PA (United States); Pacific, Oliver [Spirae, Inc., Fort Collins, CO (United States); Ropp, Michael [Northern Plains Power Technologies, Brookings, SD (United States); Tran, Teresa [DTE Energy, Detroit, MI (United States); Asgeirsson, Hawk [DTE Energy, Detroit, MI (United States); Woodard, Justin [National Grid, Warwick (United Kingdom); Steffel, Steve [Pepco Holdings, Inc., Washington, DC (United States)

    2016-03-30

    In 2011, EPRI began a four-year effort under the Department of Energy (DOE) SunShot Initiative Solar Energy Grid Integration Systems - Advanced Concepts (SEGIS-AC) to demonstrate smart grid ready inverters with utility communication. The objective of the project was to successfully implement and demonstrate effective utilization of inverters with grid support functionality to capture the full value of distributed photovoltaic (PV). The project leveraged ongoing investments and expanded PV inverter capabilities, to enable grid operators to better utilize these grid assets. Developing and implementing key elements of PV inverter grid support capabilities will increase the distribution system’s capacity for higher penetration levels of PV, while reducing the cost. The project team included EPRI, Yaskawa-Solectria Solar, Spirae, BPL Global, DTE Energy, National Grid, Pepco, EDD, NPPT and NREL. The project was divided into three phases: development, deployment, and demonstration. Within each phase, the key areas included: head-end communications for Distributed Energy Resources (DER) at the utility operations center; methods for coordinating DER with existing distribution equipment; back-end PV plant master controller; and inverters with smart-grid functionality. Four demonstration sites were chosen in three regions of the United States with different types of utility operating systems and implementations of utility-scale PV inverters. This report summarizes the project and findings from field demonstration at three utility sites.

  18. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    Science.gov (United States)

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  19. The Team to Address Bariatric Care in Canadian Children (Team ABC3): Team Grant Research Proposal.

    Science.gov (United States)

    2017-10-05

    Severe obesity (SO) in Canadian children remains poorly understood. However, based on international data, the prevalence of SO appears to be increasing and is associated with a number of psychosocial, bio-mechanical, and cardiometabolic health risks. The purpose of our national Team to Address Bariatric Care in Canadian Children (Team ABC3) is to develop and lead a series of inter-related studies to enhance the understanding and management of SO in Canadian children and adolescents (0-18 years). From 2015 to 2019, Team ABC3 will conduct a series of projects at the regional, provincial, and national levels using multiple methods and study designs to respond to key knowledge gaps by (i) generating evidence on the prevalence of SO and its impact on health services utilization in children using existing Canadian data sources from primary care settings, (ii) exploring contemporary definitions of SO that link with health outcomes, (iii) comparing and contrasting health risks across the continuum of SO, (iv) understanding potential barriers to and facilitators of treatment success in children with SO, and (v) examining innovative lifestyle and behavioral interventions designed to successfully manage SO in children and their families. Furthermore, to examine the impact of innovative interventions on the management SO, we will (vi) evaluate whether adding a health coach, who provides support via text, email, and/or phone, improves children's ability to adhere to a web-based weight management program and (vii) test the feasibility and impact of a community-based weight management program for pre-school children with SO and their parents that combines group-based parenting sessions with in-home visits. Our research aligns with national priorities in obesity research, brings together leading scientists, clinicians, and stakeholders from across Canada, and will inform health services delivery throughout the country to provide the best care possible for children with SO and

  20. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    Directory of Open Access Journals (Sweden)

    Jiaojie Han

    Full Text Available The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  1. Understanding the Effects of Team Cognition Associated with Complex Engineering Tasks: Dynamics of Shared Mental Models, Task-SMM, and Team-SMM

    Science.gov (United States)

    Lee, Miyoung; Johnson, Tristan E.

    2008-01-01

    This study investigates how shared mental models (SMMs) change over time in teams of students in a manufacturing engineering course. A complex ill-structured project was given to each team. The objective of the team project was to analyze, test, and propose ways to improve their given manufactured product. Shared mental models were measured in…

  2. NASA technology utilization applications. [transfer of medical sciences

    Science.gov (United States)

    1973-01-01

    The work is reported from September 1972 through August 1973 by the Technology Applications Group of the Science Communication Division (SCD), formerly the Biological Sciences Communication Project (BSCP) in the Department of Medical and Public Affairs of the George Washington University. The work was supportive of many aspects of the NASA Technology Utilization program but in particular those dealing with Biomedical and Technology Application Teams, Applications Engineering projects, new technology reporting and documentation and transfer activities. Of particular interest are detailed reports on the progress of various hardware projects, and suggestions and criteria for the evaluation of candidate hardware projects. Finally some observations about the future expansion of the TU program are offered.

  3. The Creation and Operation of Internal High Performance Modern Enterprises Team

    Institute of Scientific and Technical Information of China (English)

    Shengyu WANG

    2015-01-01

    The future of enterprises mainly depends on product research and development. For the modern enterprises, high performance project team is the most important means of R & D projects. According to the interviews and survey found of a plurality of enterprise project R & D team. the internal high performance team of modern business is good or bad, its key lies in whether the team managers for the team creation and management is in place, this is the most difficult place for the high performance team management system, especially the team leadership. Based on this, this paper discusses on the creation and management of high performance modern enterprise team, aiming to provide valuable reference for the enterprise team management.

  4. Service-provider and utility task-leadership integration. Paper D

    Energy Technology Data Exchange (ETDEWEB)

    Bagshaw, S.; Van Tassell, D. [AP Services, Inc., Freeport, PA (United States)

    2011-07-01

    As nuclear power utilities strive to stream-line their organizations, while improving outage and refurbishment project performance, the necessity for effective relationships and interaction between utility and service-providers becomes paramount. Successful integration of Service-Provider into the Utility's environment is achievable and has been demonstrated. Early and extensive engagement in front-end planning, single-point-of-continuity, and the use of integrated execution teams, are some of the critical elements for ensuring success. The paper discusses Task-Leadership Integration at the three levels of; utility executive level 'need-statement'; a 'why is this important' discussion; and as a 'thoughtful tutorial' on its features and practice. (author)

  5. Reading Research Utilization Project: An RIC Project for Teachers and Other Field Personnel.

    Science.gov (United States)

    District of Columbia Public Schools, Washington, DC. Dept. of Research and Evaluation.

    This is the final report of the Reading Research Utilization Project (RUP) which was funded by the U.S. Office of Education from July, 1971 to June, 1973. The purpose of the RUP was to encourage the translation of research, particularly reading research, into practice in 16 target elementary schools in Washington, D.C. RUP was a school information…

  6. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    Science.gov (United States)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  7. Introduction to the Navigation Team: Johnson Space Center EG6 Internship

    Science.gov (United States)

    Gualdoni, Matthew

    2017-01-01

    The EG6 navigation team at NASA Johnson Space Center, like any team of engineers, interacts with the engineering process from beginning to end; from exploring solutions to a problem, to prototyping and studying the implementations, all the way to polishing and verifying a final flight-ready design. This summer, I was privileged enough to gain exposure to each of these processes, while also getting to truly experience working within a team of engineers. My summer can be broken up into three projects: i) Initial study and prototyping: investigating a manual navigation method that can be utilized onboard Orion in the event of catastrophic failure of navigation systems; ii) Finalizing and verifying code: altering a software routine to improve its robustness and reliability, as well as designing unit tests to verify its performance; and iii) Development of testing equipment: assisting in developing and integrating of a high-fidelity testbed to verify the performance of software and hardware.

  8. Resilient behaviour in innovation teams for better project results

    NARCIS (Netherlands)

    Oeij, P.R.A.

    2017-01-01

    Extenden abstract. Organising in a mindful way is a central aspect to making innovation teams become more resilient and enahnce their chances of innovation success. Such organising, called mindful infrastructure, implies creating the right conditions for teams to excel. Four elements are crucial to

  9. Serious Games are a Serious Tool for Team Research

    Directory of Open Access Journals (Sweden)

    Michael D. Coovert

    2017-03-01

    Full Text Available Serious games are an attractive tool for education and training, but their utility is even broader. We argue serious games provide a unique opportunity for research as well, particularly in areas where multiple players (groups or teams are involved. In our paper we provide background in several substantive areas. First, we outline major constructs and challenges found in team research. Secondly, we discuss serious games, providing an overview and description of their role in education, training, and research. Thirdly, we describe necessary characteristics for game engines utilized in team research, followed by a discussion of the value added by utilizing serious games. Our goal in this paper is to argue serious games are an effective tool with demonstrated reliability and validity and should be part of a research program for those engaged in team research. Both team researchers and those involved in serious game development can benefit from a mutual partnership which is research focused.

  10. Disconnecting the autopilot in urban water projects

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Jensen, Marina Bergen; Øhlenschlæger, Ny

    2011-01-01

    How can we motivate urban planners, water utilities and house owners to collaborate about sustainable urban water projects and to aim for solutions that go beyond the narrow perspective of individual stakeholder interests? A concept for framing a multidisciplinary learning process is developed...... the early stages of an urban water project. To realise new sustainable urban water designs a project team will need to engage and get acceptance from internal and external stakeholders, and this calls for communication and social skills rather than technical skills. The paper identifies potential...

  11. CO-OP JIGSAW TEAM PROJECTS: A COOPERATIVE TEACHING METHOD TO IMPROVE STUDENTS‘ SPEAKING SKILL (An Experimental Study in a Senior High School

    Directory of Open Access Journals (Sweden)

    Diaz Innova Citra Arum

    2017-12-01

    Full Text Available An effective speaking activity involves active students to participate and create a life communication. The ideal condition of English speaking class involves the students‘ effectiveness in participating teaching and learning process. Nevertheless, some problems are emerged and one of them is that they often get nervous to speak in front of many people when they are asked to present their work to their friends. This paper reveals an experiment study in teaching speaking in a senior high school in Lamongan, East Java. It discusses about the effectiveness of cooperative teaching method known as coop jigsaw team projects in teaching speaking. All tenth grade students were used as the population and eighty students were taken as sample being divided into experimental group taught using coop jigsaw team projects and control group taught using direct instruction. Cluster random sampling was applied as the technique to determine sample. To obtain the data of students‘ speaking score, a speaking test was conducted. The score was the average score resulted by two independent examiners. The data were analysed through descriptive and inferential analysis using two-sample t-test. The research hypothesised that coop jigsaw will result a better English speaking score rather than direct instruction method. The research finding using 95% significance level shows that coop jigsaw team projects was more effective in teaching speaking compared to direct instruction for the tenth grade students because the activities in coop jigsaw team project pushed the students to be more active and cooperative in learning speaking.

  12. A multidisciplinary approach to team nursing within a low secure service: the team leader role.

    Science.gov (United States)

    Nagi, Claire; Davies, Jason; Williams, Marie; Roberts, Catherine; Lewis, Roger

    2012-01-01

    This article critically examines the clinical utility of redesigning a nursing practice model within the Intensive Support and Intervention Service, a new low secure mental health facility in the United Kingdom. Specifically, the "team nursing" approach to care delivery has been adapted to consist of multidisciplinary team leaders as opposed to nursing team leaders. The authors describe the role, properties, and functions of the multidisciplinary team leader approach. The authors provide examples of the benefits and challenges posed to date and the ways in which potential barriers have been overcome. Nursing care leadership can be provided by multidisciplinary staff. An adapted model of team nursing can be implemented in a low secure setting. © 2011 Wiley Periodicals, Inc.

  13. Working with sports organizations and teams.

    Science.gov (United States)

    McDuff, David R; Garvin, Michelle

    2016-12-01

    Athletes and coaches at all competitive levels will utilize sports performance and psychiatric services at very high rates if the services are offered on-site and free of charge and are broad in scope and culturally sensitive. Services should be available throughout the team year and cover areas such as team building, mental preparation, stress control, substance prevention, sleep and energy regulation, injury recovery, crisis intervention, and mental disorder treatment. The staff offering these services should be diverse by gender, profession, and culture, and the fees should be paid by the organization. When these services are endorsed by the team's leaders and integrated with the athletic training/medical/player development staff, their utilization will grow quickly and lead to positive outcomes individually and collectively.

  14. A pleasure working together? : the effects of dissimilarity in team member conscientiousness on team temporal processes and individual satisfaction

    NARCIS (Netherlands)

    Gevers, J.M.P.; Peeters, M.A.G.

    2009-01-01

    In this study of 43 student project teams, we tested a multi-level mediation model of the relationship between dissimilarity in conscientiousness, team temporal processes, and team member satisfaction. We distinguished between individual-level dissimilarity in conscientiousness (i.e., the distance

  15. Impacts of dairy diagnostic teams on herd performance.

    Science.gov (United States)

    Weinand, D; Conlin, B J

    2003-05-01

    This study evaluated impacts of educational diagnostic teams of consultants used to transfer technology to dairy farms. Herd management performance changes were measured by comparing Dairy Herd Improvement data from 38 project farms to data from herds that were geographical contemporaries. The value of focused goals for effecting change was also assessed. Interviews provided producers' perception of project outcomes and insight on organization and conduct of dairy diagnostic teams. Changes observed in project herds were small compared with controls with tendencies for increased herd size and improved milk production per cow. Focused goals had greater impacts on increasing herd size, milk per cow, first lactation peak milk, reducing age at first calving, and percentages of cows with subclinical mastitis. Time, money, facility limitations, labor, and alternative priorities were the most cited constraints to implementing changes. Satisfaction scores of producers were significantly related to the degree that team recommendations were followed. Improved attitudes, quality of life, and financial well-being were benefits listed by a majority of producers from participation in the project. If similar projects were to be offered, 83% said they would participate again, and 69% indicated they would pay at least some of the costs. Project farms served as demonstration farms for 1930 other producers in their respective locales, resulting in a multiplier effect of original advice given by consultant teams. Suggestions by farmer participants for improvements in dairy diagnostic teams included needs for at least some unbiased team members, more frequent meetings, more follow-up on recommendations, and consistency of recommendations with family goals.

  16. Biomedical engineering education through global engineering teams.

    Science.gov (United States)

    Scheffer, C; Blanckenberg, M; Garth-Davis, B; Eisenberg, M

    2012-01-01

    Most industrial projects require a team of engineers from a variety of disciplines. The team members are often culturally diverse and geographically dispersed. Many students do not acquire sufficient skills from typical university courses to function efficiently in such an environment. The Global Engineering Teams (GET) programme was designed to prepare students such a scenario in industry. This paper discusses five biomedical engineering themed projects completed by GET students. The benefits and success of the programme in educating students in the field of biomedical engineering are discussed.

  17. NASA technology applications team: Applications of aerospace technology

    Science.gov (United States)

    1993-01-01

    This report covers the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1992 through 30 September 1993. The work reported herein was supported by the National Aeronautics and Space Administration (NASA), Contract No. NASW-4367. Highlights of the RTI Applications Team activities over the past year are presented in Section 1.0. The Team's progress in fulfilling the requirements of the contract is summarized in Section 2.0. In addition to our market-driven approach to applications project development, RTI has placed increased effort on activities to commercialize technologies developed at NASA Centers. These Technology Commercialization efforts are summarized in Section 3.0. New problem statements prepared by the Team in the reporting period are presented in Section 4.0. The Team's transfer activities for ongoing projects with the NASA Centers are presented in Section 5.0. Section 6.0 summarizes the status of four add-on tasks. Travel for the reporting period is described in Section 7.0. The RTI Team staff and consultants and their project responsibilities are listed in Appendix A. Appendix B includes Technology Opportunity Announcements and Spinoff! Sheets prepared by the Team while Appendix C contains a series of technology transfer articles prepared by the Team.

  18. Managing team learning in a Spanish commercial bank

    OpenAIRE

    Døving, Erik; Martin-Rubio, Irene

    2013-01-01

    Purpose – The purpose of this paper is to analyze how team management affects team-learning activities. Design/methodology/approach – The authors empirically study 68 teams as they operate in the natural business context of a major Spanish bank. Quantitative research utilizing multiple regression analyses is used to test hypotheses. Findings – The leadership behaviour (consideration, initiation of structure) displayed by the team leader plays a key role in facilitating team learning. Te...

  19. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  20. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teaming concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.

  1. Improving Engineering Student Team Collaborative Discussions by Moving Them Online: An Investigation of Synchronous Chat and Face-to-Face Team Conversations

    Science.gov (United States)

    Fowler, Robin Revette

    2014-01-01

    Collaborative learning, particularly in the context of team-based, project-based learning, is common in undergraduate engineering education and is associated with deeper learning and enhanced student motivation and retention. However, grouping students in teams for project-based learning sometimes has negative outcomes, which can include lowered…

  2. Task conflict and team creativity: a question of how much and when.

    Science.gov (United States)

    Farh, Jiing-Lih; Lee, Cynthia; Farh, Crystal I C

    2010-11-01

    Bridging the task conflict, team creativity, and project team development literatures, we present a contingency model in which the relationship between task conflict and team creativity depends on the level of conflict and when it occurs in the life cycle of a project team. In a study of 71 information technology project teams in the greater China region, we found that task conflict had a curvilinear effect on team creativity, such that creativity was highest at moderate levels of task conflict. Additionally, we found this relationship to be moderated by team phase, such that the curvilinear effect was strongest at an early phase. In contrast, at later phases of the team life cycle, task conflict was found to be unrelated to team creativity. (c) 2010 APA, all rights reserved.

  3. Managing Team Learning in a Spanish Commercial Bank

    Science.gov (United States)

    Doving, Erik; Martin-Rubio, Irene

    2013-01-01

    Purpose: The purpose of this paper is to analyze how team management affects team-learning activities. Design/methodology/approach: The authors empirically study 68 teams as they operate in the natural business context of a major Spanish bank. Quantitative research utilizing multiple regression analyses is used to test hypotheses. Findings: The…

  4. A Guide to Community Shared Solar: Utility, Private, and Non-Profit Project Development (Book)

    Energy Technology Data Exchange (ETDEWEB)

    Coughlin, J.; Grove, J.; Irvine, L.; Jacobs, J. F.; Johnson Phillips, S.; Sawyer, A.; Wiedman, J.

    2012-05-01

    This guide is organized around three sponsorship models: utility-sponsored projects, projects sponsored by special purpose entities - businesses formed for the purpose of producing community solar power, and non-profit sponsored projects. The guide addresses issues common to all project models, as well as issues unique to each model.

  5. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  6. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  7. Pedagogical innovation in teacher teams

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    2015-01-01

    This paper presents findings from a longitudinal design-based research project examining how to enable reflection and pedagogical innovation in teacher teams. The article identifies and analyses the teachers’ learning trajectories and innovative strategies when working together in the IT...... learning designs, the research aims to clarify what kind of knowledge is being developed and shared in the teacher teams, and how this contributes to the organisational learning process. The context is Global Classroom, an innovative synchronous hybrid videoconference concept, where adult students can......-pedagogical Think Tank for Teacher Teams (after this: ITP4T) (Weitze, 2014a), a competence development model, which was developed in an earlier phase of the research project. By using theoretical lenses from innovative knowledge development frameworks to examine the teachers’ utterances, interactions and new...

  8. An update of the UPVG and the TEAM-UP Initiative

    International Nuclear Information System (INIS)

    Hester, S.; Cheney, M.

    1999-01-01

    The Utility PhotoVoltaic Group (UPVG) is a nonprofit association of over 100 energy service providers (electric utilities and energy service companies) cooperating to develop photovoltaic power as a thriving commercial energy option for the benefit of its members and their customers. The U. S. Department of Energy (DOE) and UPVG are sponsoring an initiative named TEAM-UP that has co-funded 37 business ventures since 1995 that are resulting in more than 2,500 PV installations, totaling more than 7.5 megawatts of power in 30 states. The TEAM-UP 1 ventures are significantly leveraging the federal funds. Under TEAM-UP, venture teams are investing four dollars for every dollar invested by the U. S. taxpayer. The UPVG programs are increasing the experience of electric utilities and their customers with photovoltaics and are stimulating growth in the demand for solar power. This paper describes these efforts and outlines the current status of the TEAM-UP program. copyright 1999 American Institute of Physics

  9. Exploring the concept of a team approach to wound care: Managing wounds as a team.

    Science.gov (United States)

    Moore, Zena; Butcher, Gillian; Corbett, Lisa Q; McGuiness, William; Snyder, Robert J; van Acker, Kristien

    2014-05-01

    Background - The growing prevalence and incidence of nonhealing acute and chronic wounds is a worrying concern. A major challenge is the lack of united services aimed at addressing the complex needs of individuals with wounds. However, the WHO argues that interprofessional collaboration in education and practice is key to providing the best patient care, enhancing clinical and health-related outcomes and strengthening the health system. It is based on this background that the team approach to wound care project was conceptualised. The project was jointly initiated and realised by the Association for the Advancement of Wound Care (AAWC-USA), the Australian Wound Management Association (AWMA) and the European Wound Management Association (EWMA). Aim - The aim of this project was to develop a universal model for the adoption of a team approach to wound care. Objective The overarching objective of this project was to provide recommendations for implementing a team approach to wound care within all clinical settings and through this to develop a model for advocating the team approach toward decision makers in national government levels. Method An integrative literature review was conducted. Using this knowledge, the authors arrived at a consensus on the most appropriate model to adopt and realise a team approach to wound care. Results - Eighty four articles met the inclusion criteria. Following data extraction, it was evident that none of the articles provided a definition for the terms multidisciplinary, interdisciplinary or transdisciplinary in the context of wound care. Given this lack of clarity within the wound care literature, the authors have here developed a Universal Model for the Team Approach to Wound Care to fill this gap in our current understanding. Conclusion - We advocate that the patient should be at the heart of all decision-making, as working with the Universal Model for the Team Approach to Wound Care begins with the needs of the patient. To

  10. Reaping the benefits of task conflict in teams: the critical role of team psychological safety climate.

    Science.gov (United States)

    Bradley, Bret H; Postlethwaite, Bennett E; Klotz, Anthony C; Hamdani, Maria R; Brown, Kenneth G

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance. Using evidence from 117 project teams, the present research found that psychological safety climate moderates the relationship between task conflict and performance. Specifically, task conflict and team performance were positively associated under conditions of high psychological safety. The results support the conclusion that psychological safety facilitates the performance benefits of task conflict in teams. Theoretical implications and suggestions for future research are discussed.

  11. Forming Student Online Teams for Maximum Performance

    Science.gov (United States)

    Olson, Joel D.; Ringhand, Darlene G.; Kalinski, Ray C.; Ziegler, James G.

    2015-01-01

    What is the best way to assign graduate business students to online team-based projects? Team assignments are frequently made on the basis of alphabet, time zones or previous performance. This study reviews personality as an indicator of student online team performance. The personality assessment IDE (Insights Discovery Evaluator) was administered…

  12. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  13. A recent Cleanroom success story: The Redwing project

    Science.gov (United States)

    Hausler, Philip A.

    1992-12-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  14. 4D CAD Based Method for Supporting Coordination of Urban Subsurface Utility Projects

    NARCIS (Netherlands)

    olde Scholtenhuis, Léon Luc; Hartmann, T.; Doree, Andries G.

    Coordinators of inner city utility construction works face increasing difficulty in managing their projects due to tight physical restrictions, strict deadlines and growing stakeholder fragmentation. This paper therefore presents a 4D CAD based coordination method that supports project plan scoping,

  15. Addressing dysfunctional relations among healthcare teams: improving team cooperation through applied organizational theories.

    Science.gov (United States)

    Horwitz, Sujin K; Horwitz, Irwin B; Barshes, Neal R

    2011-01-01

    Previous research has demonstrated that communication failure and interpersonal conflicts are significant impediments among health-care teams to assess complex information and engage in the meaningful collaboration necessary for optimizing patient care. Despite the prolific research on the role of effective teamwork in accomplishing complex tasks, such findings have been traditionally applied to business organizations and not medical contexts. This chapter, therefore, reviews and applies four theories from the fields of organizational behavior (OB) and organization development (OD) as potential means for improving team interaction in health-care contexts. This study is unique in its approach as it addresses the long-standing problems that exist in team communication and cooperation in health-care teams by applying well-established theories from the organizational literature. The utilization and application of the theoretical constructs discussed in this work offer valuable means by which the efficacy of team work can be greatly improved in health-care organizations.

  16. Virtual Teams and Knowledge Communication

    DEFF Research Database (Denmark)

    Lehtonen, Miikka; Kampf, Constance Elizabeth

    2014-01-01

    How does culture affect virtual teams and the knowledge communication processes in which they engage? As virtual spaces are increasingly used to support teams and establish collaboration in cross-cultural projects, the notion of cross-cultural communication can be understood as shifting from...... contextual perspective to a semiotic perspective. That is to say, although the team members are using the same vocabulary they might attach different meanings to and have different knowledge about them thus highlighting the importance of approaching virtual teams and collaboration from a semiotic perspective....... To look at how knowledge about virtual work is established in a multinational context, we interviewed members of a team that connects Finland and India. Results reveal five objects shared between the team members with varying knowledge about them. By making these differences in knowledge visible through...

  17. Volunteer Team Management

    OpenAIRE

    Monych, Maria

    2015-01-01

    This thesis looked into volunteer team management in a project in AIESEC in Finland through the action research method. AIESEC in Finland is a non-profit non-government organization with a purpose of “peace and fulfilment of humankinds potential” through development of the youth’s future leadership. AIESEC was not a commissioning party; the project was the basis for the thesis without the supervision of the company. The thesis is based on a project that the author was in charge of, in ...

  18. Multicultural Ground Teams in Space Programs

    Science.gov (United States)

    Maier, M.

    2012-01-01

    In the early years of space flight only two countries had access to space. In the last twenty years, there have been major changes in how we conduct space business. With the fall of the iron curtain and the growing of the European Union, more and more players were able to join the space business and space science. By end of the last century, numerous countries, agencies and companies earned the right to be equal partners in space projects. This paper investigates the impact of multicultural teams in the space arena. Fortunately, in manned spaceflight, especially for long duration missions, there are several studies and simulations reporting on multicultural team impact. These data have not been as well explored on the team interactions within the ground crews. The focus of this paper are the teams working on the ISS project. Hypotheses will be drawn from the results of space crew research to determine parallels and differences for this vital segment of success in space missions. The key source of the data will be drawn from structured interviews with managers and other ground crews on the ISS project.

  19. The impact of team-based primary care on health care services utilization and costs: Quebec's family medicine groups.

    Science.gov (United States)

    Strumpf, Erin; Ammi, Mehdi; Diop, Mamadou; Fiset-Laniel, Julie; Tousignant, Pierre

    2017-09-01

    We investigate the effects on health care costs and utilization of team-based primary care delivery: Quebec's Family Medicine Groups (FMGs). FMGs include extended hours, patient enrolment and multidisciplinary teams, but they maintain the same remuneration scheme (fee-for-service) as outside FMGs. In contrast to previous studies, we examine the impacts of organizational changes in primary care settings in the absence of changes to provider payment and outside integrated care systems. We built a panel of administrative data of the population of elderly and chronically ill patients, characterizing all individuals as FMG enrollees or not. Participation in FMGs is voluntary and we address potential selection bias by matching on GP propensity scores, using inverse probability of treatment weights at the patient level, and then estimating difference-in-differences models. We also use appropriate modelling strategies to account for the distributions of health care cost and utilization data. We find that FMGs significantly decrease patients' health care services utilization and costs in outpatient settings relative to patients not in FMGs. The number of primary care visits decreased by 11% per patient per year among FMG enrolees and specialist visits declined by 6%. The declines in costs were of roughly equal magnitude. We found no evidence of an effect on hospitalizations, their associated costs, or the costs of ED visits. These results provide support for the idea that primary care organizational reforms can have impacts on the health care system in the absence of changes to physician payment mechanisms. The extent to which the decline in GP visits represents substitution with other primary care providers warrants further investigation. Copyright © 2017 The Author(s). Published by Elsevier B.V. All rights reserved.

  20. Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, Vahan; O' Neill, Barbara

    2016-01-21

    A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of

  1. Assessing the impact on intercultural competencies when engineering students solve problems in multicultural teams

    DEFF Research Database (Denmark)

    Jensen, Lars Peter; Nygaard, Bjørn; Madsen, Linda

    2011-01-01

    solving problems in teams two times a year in all of their bachelor education. In at least four of the engineering education institutes in Denmark experiments on helping mixed student teams to perform better in their project work have been carried out for some years using a classic engineering trial......’ intercultural competencies. It was decided to start a formal research project to investigate some of the existing experiments helping mixed teams to cope with project work in intercultural teams. During spring 2010 the setup for the research project was developed by a group of representatives from...... as exchange students or to take a full degree. Project organized Problem based Learning is used to a high extent at most of the engineering educations in Denmark, using large scale project work (up to 15 ECTS each semester) solved in teams (3-7 students in each team). In more and more situations the teams...

  2. Loss Aversion, Team Relocations, and Major League Expansion

    OpenAIRE

    Humphreys, Brad; Zhou, Li

    2014-01-01

    Professional sports teams receive large public subsidies for new facility construction. Empirical research suggests that these subsidies cannot be justified by tangible or intangible economic benefits. We develop a model of bargaining between local governments and teams over subsidies that includes league expansion decisions. The model features loss aversion by fans that captures lost utility when a team leaves a city. The model predicts that teams exploit this loss aversion to extract larger...

  3. Developing leadership in rural interprofessional palliative care teams.

    Science.gov (United States)

    Hall, Pippa; Weaver, Lynda; Handfield-Jones, Richard; Bouvette, Maryse

    2008-01-01

    This project brought together community-based practitioners and academics to develop and deliver interventions designed to enhance the leadership abilities of the designated leaders of seven rural/small town-based palliative care teams. Members of these community-based teams have already gained recognition for their teams' leadership and service delivery in their communities. All of the teams had worked closely with most members of the academic team prior to this project. The team members participated in a needs assessment exercise developed by the Sisters of Charity of Ottawa Health Service and University of Ottawa academic team. Results of the needs assessment identified leadership qualities that had contributed to their success, as well as their needs to further enhance their individual leadership qualities. The team effort, however, was the most important factor contributing to the success of their work. The interventions developed to address the identified needs had to be adapted creatively through the collaborative efforts of both the community and academic teams. The educational interventions facilitated the integration of learning at the individual and community level into the busy work schedules of primary health care providers.

  4. Quality charters or quality members? A control theory perspective on team charters and team performance.

    Science.gov (United States)

    Courtright, Stephen H; McCormick, Brian W; Mistry, Sal; Wang, Jiexin

    2017-10-01

    Though prevalent in practice, team charters have only recently received scholarly attention. However, most of this work has been relatively devoid of theory, and consequently, key questions about why and under what conditions team charter quality affects team performance remain unanswered. To address these gaps, we draw on macro organizational control theory to propose that team charter quality serves as a team-level "behavior" control mechanism that builds task cohesion through a structured exercise. We then juxtapose team charter quality with an "input" team control mechanism that influences the emergence of task cohesion more organically: team conscientiousness. Given their redundant effects on task cohesion, we propose that the effects of team charter quality and team conscientiousness on team performance (through task cohesion) are substitutive such that team charter quality primarily impacts team performance for teams that are low (vs. high) on conscientiousness. We test and find support for our hypotheses in a sample of 239 undergraduate self-managing project teams. Our study contributes to the groups and teams literature in the following ways: first, relative to previous studies, we take a more theory-driven approach toward understanding team charters, and in doing so, uncover when and why team charter quality impacts team performance; second, we integrate two normally disparate perspectives on team effectiveness (team development and team selection) to offer a broader perspective on how teams are "built"; and third, we introduce team charter quality as a performance-enhancing mechanism for teams lower on conscientiousness. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  5. Gender and tenure diversity in GitHub teams

    NARCIS (Netherlands)

    Vasilescu, B.N.; Posnett, D.; Ray, B.; Brand, van den M.G.J.; Serebrenik, A.; Devanbu, P.; Filkov, V.

    2015-01-01

    Software development is usually a collaborative venture. Open Source Software (OSS) projects are no exception; indeed, by design, the OSS approach can accommodate teams that are more open, geographically distributed, and dynamic than commercial teams. This, we find, leads to OSS teams that are quite

  6. Study on dynamic team performance evaluation methodology based on team situation awareness model

    International Nuclear Information System (INIS)

    Kim, Suk Chul

    2005-02-01

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  7. Study on dynamic team performance evaluation methodology based on team situation awareness model

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk Chul

    2005-02-15

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  8. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    Energy Technology Data Exchange (ETDEWEB)

    Ewy, Ann; Hays, David [U.S. Army Corps of Engineers (United States)

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  9. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    International Nuclear Information System (INIS)

    Ewy, Ann; Hays, David

    2013-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  10. The impact of ageing and changing utilization patterns on future cardiovascular drug expenditure: a pharmacoepidemiological projection approach

    DEFF Research Database (Denmark)

    Kildemoes, Helle Wallach; Andersen, Morten; Støvring, Henrik

    2010-01-01

    To develop a method for projecting the impact of ageing and changing drug utilization patterns on future drug expenditure.......To develop a method for projecting the impact of ageing and changing drug utilization patterns on future drug expenditure....

  11. Longitudinal observations of globally distributed design teams: The impacts on Product Development

    DEFF Research Database (Denmark)

    Taylor, Thomas Paul; Ahmed-Kristensen, Saeema

    2015-01-01

    Factors impacting the success of Product Development (PD) projects are intensified when teams are distributed globally, making it a challenging task for project management to deal with effects on time, cost and quality. It is important for project management to understand when challenges......, such as communication difficulties, a lack of common vision between team members or issues related to documentation, may occur during PD projects, enabling them to take the necessary preventative action (Edmondson and Nembhard, 2009). When investigating factors impacting the success of PD, the majority of research...... studies of globally distributed design teams in PD projects. This paper aims to contribute to the further understanding of the factors impacting the success of PD projects when teams are distributed globally. With the results from a longitudinal observational study over 8 months, the factors impacting...

  12. Multidisciplinary safety team (MDST) factors of success.

    Science.gov (United States)

    2014-11-01

    This project included a literature review and summary that focused on subjects related to team building, team/committee member : motivational strategies, and tools for effective and efficient committee meetings. It also completed an online survey of ...

  13. APPLICATION OF FUZZY ANALYTIC HIERARCHY PROCESS TO BUILDING RESEARCH TEAMS

    Directory of Open Access Journals (Sweden)

    Karol DĄBROWSKI

    2016-01-01

    Full Text Available Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process and ANFIS (Adaptive Neuro Fuzzy Inference System methods in working groups building for R&D projects on the basis of employees skills.

  14. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    Science.gov (United States)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  15. Team Work and Democratic Learning in Projectmanagement Training

    DEFF Research Database (Denmark)

    Lidon, Ivan; Rebollar, Ruben; Qvist, Palle

    of Zaragoza, which makes it possible to detect problems of teamwork functioning in groups while they develop their projects, in order to prevent possible failure once projects are completed. The Democratic Learning Questionnaire developed at Aalborg University, which studies the decision-making process within...... it possible to establish a correlation between a group's decision making process and the quality of its functioning as a team.......Project Management is a discipline of a basically professional nature. Training in Project Management must provide students with a series of professional competencies, among which teamwork stands out as one of the most important, since all projects, by definition, must be carried out by teams...

  16. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  17. Federal and State Structures to Support Financing Utility-Scale Solar Projects and the Business Models Designed to Utilize Them

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Kreycik, C.

    2012-04-01

    Utility-scale solar projects have grown rapidly in number and size over the last few years, driven in part by strong renewable portfolio standards (RPS) and federal incentives designed to stimulate investment in renewable energy technologies. This report provides an overview of such policies, as well as the project financial structures they enable, based on industry literature, publicly available data, and questionnaires conducted by the National Renewable Energy Laboratory (NREL).

  18. GEO-6 project for Galileo data scientific utilization

    Science.gov (United States)

    Buresova, Dalia; Lastovicka, Jan; Boska, Josef; Sauli, Petra; Kouba, Daniel; Mosna, Zbysek

    The future GNSS Galileo system offer a number of benefits (e.g. availability of better accuracy positioning, new frequencies bands allowing the implementation of specific techniques, provable time-stamp and location data using SIS authorisation, integrity, better support ad-hoc algorithms for data analysis and other service guarantee for liability and regulated applications) are widely spread among different disciplines. Also applications which are less interesting from the commercial and market point of view could successfully contribute to the numerous social benefits and support the innovation in the international research. The aim of the GEO-6 project "Scientific research Using GNSS" is to propose and broaden scientific utilization of future GNSS Galileo system data in research. It is a joint project of seven institutions from six countries led by the Atos Origin Company from Spain. The core of the project consists from six projects in five priority areas: PA-1 Remote sensing of the ocean using GNSS reflections, PA-2a Investigating GNSS ionospheric data assimilation, PA-2b 3-D gravity wave detection and determination (both PA-2a and PA-2b are ionospheric topics), PA-3 Demonstration of capability for operational forecasting of atmospheric delays, PA-4 GNSS seismometer, PA-5 Spacecraft formation flying using global navigation satellite systems. Institute of Atmospheric Physics, Prague, Czech Republic is responsible for the project PA-2b, where we developed and tested (to the extent allowed by available data) an algorithm and computer code for the 3-D detection of gravity waves and determination of their characteristics. The main drivers of the GEO-6 project are: high levels of accuracy even with the support of local elements, sharing of solutions and results for the worldwide scientific community. The paper will present basic description of the project with more details concerning Czech participation in it.

  19. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1985-01-01

    Since 1980, Sandia National Laboratory has been designing and constructing Particle Beam Fusion Accelerator II. One managerial challenge of a large project is the problem of handling information. The scope of the PBFA-II projet may be gauged by its cost: $19.4 million for the accelerator itself, $9.5 million for buildings and standard utilities, and $9.6 million for specialized utilities and support systems. The first need of the project at its outset, then, was communication, and this remains a chief function of the CPO. If the nature or magnitude of the risk changes in any one area, the entire project team must know. If a design is changed, persons working on interdependent efforts must know. Some of this communication takes place naturally and informally. But project procedures must guarantee that all important communication is received by all necessary people, that the communication creates accountability, and that management receives timely, accurate reports. To put it another way, important communication requires project documentation. Documentation is both a record of the project and a tool for management

  20. Managing Communication among Geographically Distributed Teams: A Brazilian Case

    Science.gov (United States)

    Almeida, Ana Carina M.; de Farias Junior, Ivaldir H.; de S. Carneiro, Pedro Jorge

    The growing demand for qualified professionals is making software companies opt for distributed software development (DSD). At the project conception, communication and synchronization of information are critical factors for success. However problems such as time-zone difference between teams, culture, language and different development processes among sites could difficult the communication among teams. In this way, the main goal of this paper is to describe the solution adopted by a Brazilian team to improve communication in a multisite project environment. The purposed solution was based on the best practices described in the literature, and the communication plan was created based on the infrastructure needed by the project. The outcome of this work is to minimize the impact of communication issues in multisite projects, increasing productivity, good understanding and avoiding rework on code and document writing.

  1. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  2. Promoting teamwork and surgical optimization: combining TeamSTEPPS with a specialty team protocol.

    Science.gov (United States)

    Tibbs, Sheila Marie; Moss, Jacqueline

    2014-11-01

    This quality improvement project was a 300-day descriptive preintervention and postintervention comparison consisting of a convenience sample of 18 gynecology surgical team members. We administered the Team Strategies & Tools to Enhance Performance and Patient Safety (TeamSTEPPS®) Teamwork Perception Questionnaire to measure the perception of teamwork. In addition, we collected data regarding rates of compliance (ie, huddle, time out) and measurable surgical procedure times. Results showed a statistically significant increase in the number of team members present for each procedure, 2.34 μ before compared with 2.61 μ after (P = .038), and in the final time-out (FTO) compliance as a result of a clarification of the definition of FTO, 1.05 μ before compared with 1.18 μ after (P = .004). Additionally, there was improvement in staff members' perception of teamwork. The implementation of team training, protocols, and algorithms can enhance surgical optimization, communication, and work relationships. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  3. Facilitating Transition to Team Based Design Education

    DEFF Research Database (Denmark)

    Tollestrup, Christian

    2014-01-01

    profession, but at the same time it becomes very difficult to identify where and how the design is created since form-giving now becomes a group effort. So as a way to ease the transition from highly framed and facilitated high school learning context to university self-driven learning context a small...... given to two set of students; one set that received the survival kit in 2011 and 2012 and one set that did not. The questionnaire inquires the students’ attitude towards 4 aspects: 1.General level of preparedness for team and problem based project work 2.Level of information of expectations from...... supervisors and programme 3.Reflection of the role in a team, problem based project work 4.The level of information of special expectations from the Industrial Design program towards team and problem based project work. Results indicates that Class receiving the “Survival Kit” improved in the calibration...

  4. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  5. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  6. Use of the Interdisciplinary Team Approach in the Rehabilitation of ...

    African Journals Online (AJOL)

    Research and clinical experience have shown the importance of using a team approach in the rehabilitation of stroke patients. The interdisciplinary team approach is recommended in the managing or rehabilitation of such patients. This study sought to determine if the interdisciplinary team approach was utilized in the ...

  7. Intercultural Competence – Key Competence of Multicultural Teams

    Directory of Open Access Journals (Sweden)

    Diana Bebenova - Nikolova

    2014-08-01

    Full Text Available The article deals with intercultural competence of multicultural teams elaborating European projects. Firstly, it discusses basic theoretical aspects of the related concepts: culture and intercultural competence, then presents its impact on multicultural team effectiveness and models for improving it. The article finds ground on studies of intercultural competence as a set of strategic, personal, social and professional competences. The paper uses the project cycle management theory and proves that in multi-ethnic surroundings, the project membersř communication skills might not be sufficient to generate mutual understanding. Provisionally, the study performed a standardized Internet survey on self-assessment of intercultural competence among 50 experts on European projects. Another applied approach is field observation (attendance and note-taking of the 5- day training "To become diplomats between cultures", based on Bennettřs theoretical model for "Development of Intercultural Sensitivity". A training model for improving intercultural competence of multicultural team members. Possible approach for improvement of project management of crossborder or trans-border funding programs. Building intercultural competence in European project management is important, timely and necessity-driven, especially under the framework of the Danube Region Strategy.

  8. Effects of Individual Success on Globally Distributed Team Performance

    OpenAIRE

    Yılmaz, Onur

    2013-01-01

    Necessity of different competencies with high level of knowledge makes it inevitable that software development is a team work. With the today's technology, teams can communicate both synchronously and asynchronously using different online collaboration tools throughout the world. Researches indicate that there are many factors that affect the team success and in this paper, effect of individual success on globally distributed team performance will be analyzed. Student team projects undertaken...

  9. Management and integration of engineering and construction activities: Lessons learned from the AP1000R nuclear power plant China project

    International Nuclear Information System (INIS)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-01-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  10. Red Teaming of Advanced Information Assurance Concepts

    International Nuclear Information System (INIS)

    DUGGAN, RUTH A.; WOOD, BRADLEY

    1999-01-01

    Red Teaming is an advanced form of assessment that can be used to identify weaknesses in a variety of cyber systems. it is especially beneficial when the target system is still in development when designers can readily affect improvements. This paper discusses the red team analysis process and the author's experiences applying this process to five selected Information Technology Office (ITO) projects. Some detail of the overall methodology, summary results from the five projects, and lessons learned are contained within this paper

  11. Energy Utilization Evaluation of Carbon Performance in Public Projects by FAHP and Cloud Model

    Directory of Open Access Journals (Sweden)

    Lin Li

    2016-07-01

    Full Text Available With the low-carbon economy advocated all over the world, how to use energy reasonably and efficiently in public projects has become a major issue. It has brought many open questions, including which method is more reasonable in evaluating the energy utilization of carbon performance in public projects when the evaluation information is fuzzy; whether an indicator system can be constructed; and which indicators have more impact on carbon performance. This article aims to solve these problems. We propose a new carbon performance evaluation system for energy utilization based on project processes (design, construction, and operation. Fuzzy Analytic Hierarchy Process (FAHP is used to accumulate the indicator weights and cloud model is incorporated when the indicator value is fuzzy. Finally, we apply our indicator system to a case study of the Xiangjiang River project in China, which demonstrates the applicability and efficiency of our method.

  12. SYNERGY EFFECTS IN WORK TEAMS

    Directory of Open Access Journals (Sweden)

    Raluca C. ZOLTAN

    2014-06-01

    Full Text Available Today’s organization increasingly utilizes all kind of teams in order to surpass their competitors through flexibility, adaptability and innovation, features which are seen to characterize the teams. For this purpose, the concept of synergy in teams’ activity is often mentioned as the prime reason for which collective work is considered to be superior comparative with individual work. But what exactly does it mean? The present paper aims to shed some light on the concept of synergy in work teams and its positive effects, namely, the social consequences of collective work such as social compensation, social indispensability, social comparison, social identity, but also its negative effects, such as free-riding, social loafing and sucker effect. These are important group phenomena that managers should be aware of because they have a major impact on team performance, and consequently, on organization performance.

  13. Electronic Mentoring of LIS Research Utilizing BITNET: An ACRL Pilot Project.

    Science.gov (United States)

    Gregory, Vicki L.

    1992-01-01

    Describes an ACRL (American College and Research Libraries) project that utilized the electronic conferencing facility of BITNET to provide a system of mentoring for academic librarians conducting research. Results of an electronic mail survey of participants that examined experience levels, attitudes, problems, and communication patterns are…

  14. Teaming. The Key to World Class Manufacturing.

    Science.gov (United States)

    Wright, John R.

    1999-01-01

    Lean manufacturing, a streamlined system of flow and job shop techniques, relies on self-directed work teams. Technology educators can prepare students for work in this environment by using problem-solving teams in the classroom to work on design briefs and other group projects. (SK)

  15. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  16. SYNERGY EFFECTS IN WORK TEAMS

    OpenAIRE

    Raluca C. Zoltan

    2014-01-01

    Today’s organization increasingly utilizes all kind of teams in order to surpass their competitors through flexibility, adaptability and innovation, features which are seen to characterize the teams. For this purpose, the concept of synergy in teams’ activity is often mentioned as the prime reason for which collective work is considered to be superior comparative with individual work. But what exactly does it mean? The present paper aims to shed some light on the concept of synergy in work te...

  17. Creating Shared Understanding in Product development Teams

    DEFF Research Database (Denmark)

    Nielsen, Louise Møller; Tollestrup, Christian

    , they also have to figure out what their users and stakeholders find important. In other words, the team has to frame their project around real user needs, problems or opportunities – and figure out what people really want, and at the same time come to an agreement about this framing within the team......It is the first meeting in a new promising project. Everyone around the table is enthusiastic about the project and excited to get going. There is a good atmos¬phere and the discussion travels back and forth. Everyone tries to present their point of view, which results in a broad discussion on very...... if they have reached an agreement and everyone nods their approval. Everyone leaves the meeting, confident that they know what to do. A few weeks after, it is time for the second meeting. The team spirit is still high and there is a nice buzz in the meeting room, before the meeting starts. The introduction...

  18. The PALLAS research and isotope reactor project status

    International Nuclear Information System (INIS)

    Van Der Schaaf, B.; De Jong, P.

    2010-01-01

    In the European Union the first generation research reactors is nearing their end of life condition. Several committees recommend a comprehensive set of reactors in the EU, amongst them the replacement for the HFR research and isotope reactor in Petten: PALLAS. The business case for PALLAS supports a future for a research and isotope reactor in Petten as a perfect fit for the future EU set of test reactors. The tender for PALLAS started in 2007, following the EU rules for tendering complex objects with the competitive dialogue. This procedure involved an extensive consultation phase between individual tendering companies and NRG, resulting in definitive specifications in summer 2008. The evaluation of offers, including conceptual designs, took place in summer 2009. At present NRG is still active in the acquisition of the funding for the project. The licensing path has been started in autumn 2009 with a initiation note on the environmental impact assessment, EIA. The public hearings held in the lead to the advice from the national EIA committee for the approach of the assessment. The PALLAS project team in Petten will guide the design and build processes. It is also responsible for the licensing of the building and operation of PALLAS. The team also manages the design and construction for the infrastructure, such as cooling devices, including remnant heat utilization, and utility provisions. A particular responsibility for the team is the design and construction of experimental and isotope capsules, based on launch customer requirements. (author)

  19. Conceptualizing the role of multidisciplinarity and student perceptions of university-industry collaboration in project-based learning

    OpenAIRE

    Heikkinen, Juho

    2017-01-01

    Project-based learning has a long history, especially in the disciplines of computer science and engineering. This approach is used to offer students a realistic view of their discipline, and this experience can be enhanced with industrial involvement as companies bring their real world problems to projects. One recent trend in project-based learning is utilizing multidisciplinary teams, enabling students to contrast their skills and experience with students from other discipli...

  20. Team Emergency Assessment Measure (TEAM) for the assessment of non-technical skills during resuscitation: Validation of the French version.

    Science.gov (United States)

    Maignan, Maxime; Koch, François-Xavier; Chaix, Jordane; Phellouzat, Pierre; Binauld, Gery; Collomb Muret, Roselyne; Cooper, Simon J; Labarère, José; Danel, Vincent; Viglino, Damien; Debaty, Guillaume

    2016-04-01

    Evaluation of team performances during medical simulation must rely on validated and reproducible tools. Our aim was to build and validate a French version of the Team Emergency Assessment Measure (TEAM) score, which was developed for the assessment of team performance and non-technical skills during resuscitation. A forward and backward translation of the initial TEAM score was made, with the agreement and the final validation by the original author. Ten medical teams were recruited and performed a standardized cardiac arrest simulation scenario. Teams were videotaped and nine raters evaluate non-technical skills for each team thanks to the French TEAM Score. Psychometric properties of the score were then evaluated. French TEAM score showed an excellent reliability with a Cronbach coefficient of 0.95. Mean correlation coefficient between each item and the global score range was 0.78. The inter-rater reliability measured by intraclass correlation coefficient of the global score was 0.93. Finally, expert teams had higher French TEAM score than intermediate and novice teams. The French TEAM score shows good psychometric properties to evaluate team performance during cardiac arrest simulation. Its utilization could help in the assessment of non-technical skills during simulation. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  1. The big five personality traits and individual satisfaction with the team

    NARCIS (Netherlands)

    Peeters, Miranda A.G.; Rutte, Christel G.; van Tuijl, Harrie F.J.M.; Reymen, Isabelle

    2006-01-01

    Relationships between team composition in terms of team members' Big Five personality traits and individual satisfaction with the team after project completion were researched. Questionnaires were filled out by 310 undergraduate students (N= 68 teams) working on an engineering design assignment.

  2. Team Reasoning and Intentional Cooperation for Mutual Benefit

    OpenAIRE

    Sugden Robert

    2015-01-01

    This paper proposes a concept of intentional cooperation for mutual benefit. This concept uses a form of team reasoning in which team members aim to achieve common interests, rather than maximising a common utility function, and in which team reasoners can coordinate their behaviour by following pre-existing practices. I argue that a market transaction can express intentions for mutually beneficial cooperation even if, extensionally, participation in the transaction promotes each party’s self...

  3. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    Energy Technology Data Exchange (ETDEWEB)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  4. Challenges and Approaches to Make Multidisciplinary Team Meetings Interoperable - The KIMBo Project.

    Science.gov (United States)

    Krauss, Oliver; Holzer, Karl; Schuler, Andreas; Egelkraut, Reinhard; Franz, Barbara

    2017-01-01

    Multidisciplinary team meetings (MDTMs) are already in use for certain areas in healthcare (e.g. treatment of cancer). Due to the lack of common standards and accessibility for the applied IT systems, their potential is not yet completely exploited. Common requirements for MDTMs shall be identified and aggregated into a process definition to be automated by an application architecture utilizing modern standards in electronic healthcare, e.g. HL7 FHIR. To identify requirements, an extensive literature review as well as semi-structured expert interviews were conducted. Results showed, that interoperability and flexibility in terms of the process are key requirements to be addressed. An architecture blueprint as well as an aggregated process definition were derived from the insights gained. To evaluate the feasibility of identified requirements, methods of explorative prototyping in software engineering were used. MDTMs will become an important part of modern and future healthcare but the need for standardization in terms of interoperability is imminent.

  5. Utility-Scale Concentrating Solar Power and Photovoltaic Projects: A Technology and Market Overview

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Lowder, T.; Canavan, B.

    2012-04-01

    Over the last several years, solar energy technologies have been, or are in the process of being, deployed at unprecedented levels. A critical recent development, resulting from the massive scale of projects in progress or recently completed, is having the power sold directly to electric utilities. Such 'utility-scale' systems offer the opportunity to deploy solar technologies far faster than the traditional 'behind-the-meter' projects designed to offset retail load. Moreover, these systems have employed significant economies of scale during construction and operation, attracting financial capital, which in turn can reduce the delivered cost of power. This report is a summary of the current U.S. utility-scale solar state-of-the-market and development pipeline. Utility-scale solar energy systems are generally categorized as one of two basic designs: concentrating solar power (CSP) and photovoltaic (PV). CSP systems can be further delineated into four commercially available technologies: parabolic trough, central receiver (CR), parabolic dish, and linear Fresnel reflector. CSP systems can also be categorized as hybrid, which combine a solar-based system (generally parabolic trough, CR, or linear Fresnel) and a fossil fuel energy system to produce electric power or steam.

  6. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  7. Adaptive heterogeneous multi-robot teams

    Energy Technology Data Exchange (ETDEWEB)

    Parker, L.E.

    1998-11-01

    This research addresses the problem of achieving fault tolerant cooperation within small- to medium-sized teams of heterogeneous mobile robots. The author describes a novel behavior-based, fully distributed architecture, called ALLIANCE, that utilizes adaptive action selection to achieve fault tolerant cooperative control in robot missions involving loosely coupled, largely independent tasks. The robots in this architecture possess a variety of high-level functions that they can perform during a mission, and must at all times select an appropriate action based on the requirements of the mission, the activities of other robots, the current environmental conditions, and their own internal states. Since such cooperative teams often work in dynamic and unpredictable environments, the software architecture allows the team members to respond robustly and reliably to unexpected environmental changes and modifications in the robot team that may occur due to mechanical failure, the learning of new skills, or the addition or removal of robots from the team by human intervention. After presenting ALLIANCE, the author describes in detail the experimental results of an implementation of this architecture on a team of physical mobile robots performing a cooperative box pushing demonstration. These experiments illustrate the ability of ALLIANCE to achieve adaptive, fault-tolerant cooperative control amidst dynamic changes in the capabilities of the robot team.

  8. Team Mentoring for Interdisciplinary Team Science: Lessons From K12 Scholars and Directors.

    Science.gov (United States)

    Guise, Jeanne-Marie; Geller, Stacie; Regensteiner, Judith G; Raymond, Nancy; Nagel, Joan

    2017-02-01

    Mentoring is critical for academic success. As science transitions to a team science model, team mentoring may have advantages. The goal of this study was to understand the process, benefits, and challenges of team mentoring relating to career development and research. A national survey was conducted of Building Interdisciplinary Research Careers in Women's Health (BIRCWH) program directors-current and former scholars from 27 active National Institutes of Health (NIH)-funded BIRCWH NIH K12 programs-to characterize and understand the value and challenges of the team approach to mentoring. Quantitative data were analyzed descriptively, and qualitative data were analyzed thematically. Responses were received from 25/27 (93%) program directors, 78/108 (72%) current scholars, and 91/162 (56%) former scholars. Scholars reported that team mentoring was beneficial to their career development (152/169; 90%) and research (148/169; 88%). Reported advantages included a diversity of opinions, expanded networking, development of stronger study designs, and modeling of different career paths. Challenges included scheduling and managing conflicting opinions. Advice by directors offered to junior faculty entering team mentoring included the following: not to be intimidated by senior mentors, be willing to navigate conflicting advice, be proactive about scheduling and guiding discussions, have an open mind to different approaches, be explicit about expectations and mentors' roles (including importance of having a primary mentor to help navigate discussions), and meet in person as a team. These findings suggest that interdisciplinary/interprofessional team mentoring has many important advantages, but that skills are required to optimally utilize multiple perspectives.

  9. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  10. Factors associated with continuance commitment to FAA matrix teams.

    Science.gov (United States)

    1993-11-01

    Several organizations within the FAA employ matrix teams to achieve cross-functional coordination. Matrix team members typically represent different organizational functions required for project accomplishment (e.g., research and development, enginee...

  11. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  12. Utility-Scale Solar 2015: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division; Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Environmental Energy Technologies Division

    2016-08-17

    The utility-scale solar sector—defined here to include any ground-mounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar power (“CSP”) project that is larger than 5 MWAC in capacity—has led the overall U.S. solar market in terms of installed capacity since 2012. It is expected to maintain its market-leading position for at least another five years, driven in part by December 2015’s three-year extension of the 30% federal investment tax credit (“ITC”) through 2019 (coupled with a favorable switch to a “start construction” rather than a “placed in service” eligibility requirement, and a gradual phase down of the credit to 10% by 2022). In fact, in 2016 alone, the utility-scale sector is projected to install more than twice as much new capacity as it ever has previously in a single year. This unprecedented boom makes it difficult, yet more important than ever, to stay abreast of the latest utility-scale market developments and trends. This report—the fourth edition in an ongoing annual series—is intended to help meet this need, by providing in-depth, annually updated, data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes not just installed project costs or prices—i.e., the traditional realm of most solar economic analyses—but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects throughout the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.

  13. Utility-Scale Solar 2014. An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-09-01

    Other than the nine Solar Energy Generation Systems (“SEGS”) parabolic trough projects built in the 1980s, virtually no large-scale or “utility-scale” solar projects – defined here to include any groundmounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar thermal power (“CSP”) project larger than 5 MWAC – existed in the United States prior to 2007. By 2012 – just five years later – utility-scale had become the largest sector of the overall PV market in the United States, a distinction that was repeated in both 2013 and 2014 and that is expected to continue for at least the next few years. Over this same short period, CSP also experienced a bit of a renaissance in the United States, with a number of large new parabolic trough and power tower systems – some including thermal storage – achieving commercial operation. With this critical mass of new utility-scale projects now online and in some cases having operated for a number of years (generating not only electricity, but also empirical data that can be mined), the rapidly growing utility-scale sector is ripe for analysis. This report, the third edition in an ongoing annual series, meets this need through in-depth, annually updated, data-driven analysis of not just installed project costs or prices – i.e., the traditional realm of solar economics analyses – but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects in the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are presented where appropriate.

  14. Utility industry evaluation of the Sodium Advanced Fast Reactor

    International Nuclear Information System (INIS)

    Burstein, S.; DelGeorge, L.O.; Tramm, T.R.; Gibbons, J.P.; High, M.D.; Neils, G.H.; Pilmer, D.F.; Tomonto, J.R.; Wells, J.T.

    1990-02-01

    A team of utility industry representatives evaluated the Sodium Advanced Fast Reactor plant design, a current liquid metal reactor design created by an industrial team led by Rockwell International under Department of Energy sponsorship. The utility industry team concluded that the plant design offers several attractive characteristics, especially in the safety arena, as well as preserving the traditional attraction of liquid metal reactors, very high fuel utilization. Specific comments and recommendations are provided as a contribution towards improving an already attractive plant design. 18 refs

  15. Short-term service trips and the interprofessional team: a perspective from Honduras.

    Science.gov (United States)

    VanderWielen, Lynn M; Halder, Gabriela E; Enurah, Alexander S; Pearson, Catherine; Stevens, Michael P; Crossman, Steven H

    2015-03-01

    Short-term service trips from the USA annually spend over $250 million dollars to provide healthcare to individuals in developing nations. These trips often uniquely define goals as related to changes in the host population and overlook the valuable benefits potentially incurred by the trip volunteers. The Honduras Outreach Medical Brigada Relief Effort utilizes an interprofessional team approach to develop the dual goals of improving health and quality of life in host communities and improving interprofessional teamwork values and skills among participants. This article outlines details of this program, describes on-going evaluation work and discusses the interprofessional implications from this project.

  16. Making star teams out of star players.

    Science.gov (United States)

    Mankins, Michael; Bird, Alan; Root, James

    2013-01-01

    Top talent is an invaluable asset: In highly specialized or creative work, for instance, "A" players are likely to be six times as productive as "B" players. So when your company has a crucial strategic project, why not multiply all that firepower and have a team of your best performers tackle it? Yet many companies hesitate to do this, believing that all-star teams don't work: Big egos will get in the way. The stars won't be able to work with one another. They'll drive the team Leader crazy. Mankins, Bird, and Root of Bain & Company believe it's time to set aside that thinking. They have seen all-star teams do extraordinary work. But there is a right way and a wrong way to organize them. Before you can even begin to assemble such a team, you need to have the right talent management practices, so you hire and develop the best people and know what they're capable of. You have to give the team appropriate incentives and leaders and support staffers who are stars in their own right. And projects that are ill-defined or small scale are not for all-star teams. Use them only for critical missions, and make sure their objectives are clear. Even with the right setup, things can still go wrong. The wise executive will take steps to manage egos, prune non-team-players, and prevent average coworkers from feeling completely undervalued. She will also invest a lot of time in choosing the right team Leader and will ask members for lots of feedback to monitor how that leader is doing.

  17. Managing Global Virtual Teams across Classrooms, Students and Faculty

    Science.gov (United States)

    Shea, Timothy P.; Sherer, Pamela D.; Quilling, Rosemary D.; Blewett, Craig N.

    2011-01-01

    Virtual teams are becoming commonplace in business today so our business school students should have experience in effectively working in virtual teams. Based on a month-long virtual team project conducted by the authors between classes in South Africa and the United States, this paper discusses the opportunities and challenges of using global…

  18. Basketball teams as strategic networks.

    Science.gov (United States)

    Fewell, Jennifer H; Armbruster, Dieter; Ingraham, John; Petersen, Alexander; Waters, James S

    2012-01-01

    We asked how team dynamics can be captured in relation to function by considering games in the first round of the NBA 2010 play-offs as networks. Defining players as nodes and ball movements as links, we analyzed the network properties of degree centrality, clustering, entropy and flow centrality across teams and positions, to characterize the game from a network perspective and to determine whether we can assess differences in team offensive strategy by their network properties. The compiled network structure across teams reflected a fundamental attribute of basketball strategy. They primarily showed a centralized ball distribution pattern with the point guard in a leadership role. However, individual play-off teams showed variation in their relative involvement of other players/positions in ball distribution, reflected quantitatively by differences in clustering and degree centrality. We also characterized two potential alternate offensive strategies by associated variation in network structure: (1) whether teams consistently moved the ball towards their shooting specialists, measured as "uphill/downhill" flux, and (2) whether they distributed the ball in a way that reduced predictability, measured as team entropy. These network metrics quantified different aspects of team strategy, with no single metric wholly predictive of success. However, in the context of the 2010 play-offs, the values of clustering (connectedness across players) and network entropy (unpredictability of ball movement) had the most consistent association with team advancement. Our analyses demonstrate the utility of network approaches in quantifying team strategy and show that testable hypotheses can be evaluated using this approach. These analyses also highlight the richness of basketball networks as a dataset for exploring the relationships between network structure and dynamics with team organization and effectiveness.

  19. The role of social capital on trust development and dynamics: Implications for cooperation, monitoring and team performance

    NARCIS (Netherlands)

    Costa, A.C.; Bijlsma-Frankema, K.M.; de Jong, B.A.

    2009-01-01

    This study examined the development and dynamics of trust in project teams and explored the relation with cooperation, monitoring and team performance. Two types of teams were distinguished at the start of the projects: low prior social-capital teams (teams composed of members that have no previous

  20. Patients as team members: opportunities, challenges and paradoxes of including patients in multi-professional healthcare teams.

    Science.gov (United States)

    Martin, Graham P; Finn, Rachael

    2011-11-01

    Current healthcare policy emphasises the need for more collaborative, team-based approaches to providing care, and for a greater voice for service users in the management and delivery of care. Increasingly, policy encourages 'partnerships' between users and professionals so that users, too, effectively become team members. In examining this phenomenon, this paper draws on insights from the organisational-sociological literature on team work, which highlights the challenges of bringing together diverse professional groups, but which has not, to date, been applied in contexts where users, too, are included in teams. Using data from a qualitative study of five pilot cancer-genetics projects, in which service users were included in teams responsible for managing and developing new services, it highlights the difficulties involved in making teams of such heterogeneous members-and the paradoxes that arise when this task is achieved. It reveals how the tension between integration and specialisation of team members, highlighted in the literature on teams in general, is especially acute for service users, the distinctiveness of whose contribution is more fragile, and open to blurring. © 2011 The Authors. Sociology of Health & Illness © 2011 Foundation for the Sociology of Health & Illness/Blackwell Publishing Ltd.

  1. The In-Situ Resource Utilization Project Under the New Exploration Enterprise

    Science.gov (United States)

    Larson, William E.; Sanders, Gerald B.

    2010-01-01

    The In Situ Resource Utilization Project under the Exploration Technology Development Program has been investing in technologies to produce Oxygen from the regolith of the moon for the last few years. Much of this work was demonstrated in a lunar analog field demonstration in February of 2010. This paper will provide an overview of the key technologies demonstrated at the field demonstration will be discussed a long with the changes expected in the ISRU project as a result of the new vision for Space Exploration proposed by the President and enacted by the Congress in the NASA Authorization Act of2010.

  2. TEAMS Model for the HPGF LN2 Pump System Diagnostic Utility

    Data.gov (United States)

    National Aeronautics and Space Administration — The Testability, Engineering, and Maintenance Systems (TEAMS) Product Suite developed by Qualtech Systems Inc. has been adopted across NASA for integrating...

  3. The European Union's four-man team of experts attending a demonstration of the DataGrid Project at CERN in early February.

    CERN Multimedia

    2003-01-01

    The DataGrid Project is reviewed by a team of European experts on a yearly basis. At the beginning of February it passed the second of these reviews with flying colours, the four experts issuing enthusiastic statements on the latest progress made, which was quite considerable in 2002.

  4. Management and Beneficial Reuse of Overburden Material - Linde Formerly Utilized Sites Remedial Action Program (FUSRAP) Remediation Project

    International Nuclear Information System (INIS)

    Boyle, J.D.; Schwippert, M.; Lorenz, W.D.

    2009-01-01

    This paper outlines three separate and distinct situations where the proper management of overburden material allows for the beneficial reuse of overburden material. Beneficial reuse of overburden material at the Linde Project was made possible by a simultaneous combination of physical conditions at the site in conjunction with collaborative planning and cooperation between U.S. Army Corps of Engineers - Buffalo District, New York State Department of Energy and Conservation, the Owner and Shaw Environmental and Infrastructure. Efforts by the project team focused on maintaining compliance with project plan requirements, communicating the plan to all parties, executing the plan safely and efficiently, and emphasizing fiscal responsibility to ensure maximum cost savings. (authors)

  5. Dynamics of Research Team Formation in Complex Networks

    Science.gov (United States)

    Sun, Caihong; Wan, Yuzi; Chen, Yu

    Most organizations encourage the formation of teams to accomplish complicated tasks, and vice verse, effective teams could bring lots benefits and profits for organizations. Network structure plays an important role in forming teams. In this paper, we specifically study the dynamics of team formation in large research communities in which knowledge of individuals plays an important role on team performance and individual utility. An agent-based model is proposed, in which heterogeneous agents from research communities are described and empirically tested. Each agent has a knowledge endowment and a preference for both income and leisure. Agents provide a variable input (‘effort’) and their knowledge endowments to production. They could learn from others in their team and those who are not in their team but have private connections in community to adjust their own knowledge endowment. They are allowed to join other teams or work alone when it is welfare maximizing to do so. Various simulation experiments are conducted to examine the impacts of network topology, knowledge diffusion among community network, and team output sharing mechanisms on the dynamics of team formation.

  6. Characteristics of team briefings in gynecological surgery.

    Science.gov (United States)

    Forsyth, Katherine L; Hildebrand, Emily A; Hallbeck, M Susan; Branaghan, Russell J; Blocker, Renaldo C

    2018-02-24

    Preoperative briefings have been proven beneficial for improving team performance in the operating room. However, there has been minimal research regarding team briefings in specific surgical domains. As part of a larger project to develop a briefing structure for gynecological surgery, the study aimed to better understand the current state of pre-operative team briefings in one department of an academic hospital. Twenty-four team briefings were observed and video recorded. Communication was analyzed and social network metrics were created based on the team member verbal interactions. Introductions occurred in only 25% of the briefings. Network analysis revealed that average team briefings exhibited a hierarchical structure of communication, with the surgeon speaking the most frequently. The average network for resident-led briefings displayed a non-hierarchical structure with all team members communicating with the resident. Briefings conducted without a standardized protocol can produce variable communication between the role leading and the team members present. Copyright © 2018 Elsevier Ltd. All rights reserved.

  7. Intra project team disagreement, conflict communications, and team performance in cross-functional new product teams: A decision-making quality perspective

    Directory of Open Access Journals (Sweden)

    Tsun Jin Chang

    2014-02-01

    Full Text Available This paper develops and examines a model of the antecedents and consequences of decision-making comprehensiveness during the new product development process. This model firstly suggests a concave relationship between intrateam task disagreement and decision-making comprehensiveness. It also conjectures that conflict communications influence the effectiveness of decision-making comprehensiveness on new product teams’ performance. An empirical test of the proposed framework involves a survey of 220 cross-functional new product teams. The findings show that an inverse U-shaped relationship exists between intrateam task disagreement and decision-making comprehensiveness. It also indicates that collaborative communication has a negative effect on innovativeness, whereas contentious communication adversely affects constraint adherence. However, decision-making comprehensiveness partially moderates the relationships between conflict communications and team performance. Some managerial and research implications of the findings were also discussed in this study.

  8. LARGE-SCALE MECURY CONTROL TECHNOLOGY TESTING FOR LIGNITE-FIRED UTILITIES-OXIDATION SYSTEMS FOR WET FGD

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Holmes; Steven A. Benson; Jeffrey S. Thompson

    2004-03-01

    The Energy & Environmental Research Center (EERC) is conducting a consortium-based effort directed toward resolving the mercury (Hg) control issues facing the lignite industry. Specifically, the EERC team--the EERC, EPRI, URS, ADA-ES, Babcock & Wilcox, the North Dakota Industrial Commission, SaskPower, and the Mercury Task Force, which includes Basin Electric Power Cooperative, Otter Tail Power Company, Great River Energy, Texas Utilities (TXU), Montana-Dakota Utilities Co., Minnkota Power Cooperative, BNI Coal Ltd., Dakota Westmoreland Corporation, and the North American Coal Company--has undertaken a project to significantly and cost-effectively oxidize elemental mercury in lignite combustion gases, followed by capture in a wet scrubber. This approach will be applicable to virtually every lignite utility in the United States and Canada and potentially impact subbituminous utilities. The oxidation process is proven at the pilot-scale and in short-term full-scale tests. Additional optimization is continuing on oxidation technologies, and this project focuses on longer-term full-scale testing. The lignite industry has been proactive in advancing the understanding of and identifying control options for Hg in lignite combustion flue gases. Approximately 1 year ago, the EERC and EPRI began a series of Hg-related discussions with the Mercury Task Force as well as utilities firing Texas and Saskatchewan lignites. This project is one of three being undertaken by the consortium to perform large-scale Hg control technology testing to address the specific needs and challenges to be met in controlling Hg from lignite-fired power plants. This project involves Hg oxidation upstream of a system equipped with an electrostatic precipitator (ESP) followed by wet flue gas desulfurization (FGD). The team involved in conducting the technical aspects of the project includes the EERC, Babcock & Wilcox, URS, and ADA-ES. The host sites include Minnkota Power Cooperative Milton R. Young

  9. Enhancing Mathematical Communication for Virtual Math Teams

    Science.gov (United States)

    Stahl, Gerry; Çakir, Murat Perit; Weimar, Stephen; Weusijana, Baba Kofi; Ou, Jimmy Xiantong

    2010-01-01

    The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT) service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies…

  10. Enhancing Mathematical Communication for Virtual Math Teams

    Directory of Open Access Journals (Sweden)

    Gerry Stahl

    2010-06-01

    Full Text Available The Math Forum is an online resource center for pre-algebra, algebra, geometry and pre-calculus. Its Virtual Math Teams (VMT service provides an integrated web-based environment for small teams of people to discuss math and to work collaboratively on math problems or explore interesting mathematical micro-worlds together. The VMT Project studies the online math discourse that takes place during sessions of virtual math teams working on open-ended problem-solving tasks. In particular, it investigates methods of group cognition that are employed by teams in this setting. The VMT environment currently integrates social networking, synchronous text chat, a shared whiteboard for drawing, web browsers and an asynchronous wiki for exchanging findings within the larger community. A simple version of MathML is supported in the whiteboard, chat and wiki for displaying mathematical expressions. The VMT Project is currently integrating the dynamic mathematics application, GeoGebra, into its collaboration environment. This will create a multi-user version of GeoGebra, which can be used in concert with the chat, web browsers, curricular topics and wiki repository.

  11. Foundations for a Team Oriented Curriculum

    Science.gov (United States)

    Neal, Brandi; Martz, Ben

    2016-01-01

    The business world today values collaboration and team work skills such as those found in the area of project management, business process reengineering, quality circles, etc. In response, the use of group projects permeates many curricula today with varying consequences and levels of success. Technology claims to enhance collaboration in…

  12. Methane Gas Utilization Project from Landfill at Ellery (NY)

    Energy Technology Data Exchange (ETDEWEB)

    Pantelis K. Panteli

    2012-01-10

    Landfill Gas to Electric Energy Generation and Transmission at Chautauqua County Landfill, Town of Ellery, New York. The goal of this project was to create a practical method with which the energy, of the landfill gas produced by the decomposing waste at the Chautauqua County Landfill, could be utilized. This goal was accomplished with the construction of a landfill gas to electric energy plant (originally 6.4MW and now 9.6MW) and the construction of an inter-connection power-line, from the power-plant to the nearest (5.5 miles) power-grid point.

  13. Are High Achievers Successful in Collaborative Learning? An Explorative Study of College Students' Learning Approaches in Team Project-Based Learning

    Science.gov (United States)

    Lee, Hye-Jung; Kim, Hyekyung; Byun, Hyunjung

    2017-01-01

    This study analyses how high-achieving students approach team project-based learning (TPBL) and aims to identify the implications and challenges of TPBL practice in higher education. After interviewing 32 high-achieving students and surveying 1022 additional students at a South Korean university, we found that four factors were particularly…

  14. Turbine and Structural Seals Team Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — Seals Team Facilities conceive, develop, and test advanced turbine seal concepts to increase efficiency and durability of turbine engines. Current projects include...

  15. Basketball Teams as Strategic Networks

    Science.gov (United States)

    Fewell, Jennifer H.; Armbruster, Dieter; Ingraham, John; Petersen, Alexander; Waters, James S.

    2012-01-01

    We asked how team dynamics can be captured in relation to function by considering games in the first round of the NBA 2010 play-offs as networks. Defining players as nodes and ball movements as links, we analyzed the network properties of degree centrality, clustering, entropy and flow centrality across teams and positions, to characterize the game from a network perspective and to determine whether we can assess differences in team offensive strategy by their network properties. The compiled network structure across teams reflected a fundamental attribute of basketball strategy. They primarily showed a centralized ball distribution pattern with the point guard in a leadership role. However, individual play-off teams showed variation in their relative involvement of other players/positions in ball distribution, reflected quantitatively by differences in clustering and degree centrality. We also characterized two potential alternate offensive strategies by associated variation in network structure: (1) whether teams consistently moved the ball towards their shooting specialists, measured as “uphill/downhill” flux, and (2) whether they distributed the ball in a way that reduced predictability, measured as team entropy. These network metrics quantified different aspects of team strategy, with no single metric wholly predictive of success. However, in the context of the 2010 play-offs, the values of clustering (connectedness across players) and network entropy (unpredictability of ball movement) had the most consistent association with team advancement. Our analyses demonstrate the utility of network approaches in quantifying team strategy and show that testable hypotheses can be evaluated using this approach. These analyses also highlight the richness of basketball networks as a dataset for exploring the relationships between network structure and dynamics with team organization and effectiveness. PMID:23139744

  16. Basketball teams as strategic networks.

    Directory of Open Access Journals (Sweden)

    Jennifer H Fewell

    Full Text Available We asked how team dynamics can be captured in relation to function by considering games in the first round of the NBA 2010 play-offs as networks. Defining players as nodes and ball movements as links, we analyzed the network properties of degree centrality, clustering, entropy and flow centrality across teams and positions, to characterize the game from a network perspective and to determine whether we can assess differences in team offensive strategy by their network properties. The compiled network structure across teams reflected a fundamental attribute of basketball strategy. They primarily showed a centralized ball distribution pattern with the point guard in a leadership role. However, individual play-off teams showed variation in their relative involvement of other players/positions in ball distribution, reflected quantitatively by differences in clustering and degree centrality. We also characterized two potential alternate offensive strategies by associated variation in network structure: (1 whether teams consistently moved the ball towards their shooting specialists, measured as "uphill/downhill" flux, and (2 whether they distributed the ball in a way that reduced predictability, measured as team entropy. These network metrics quantified different aspects of team strategy, with no single metric wholly predictive of success. However, in the context of the 2010 play-offs, the values of clustering (connectedness across players and network entropy (unpredictability of ball movement had the most consistent association with team advancement. Our analyses demonstrate the utility of network approaches in quantifying team strategy and show that testable hypotheses can be evaluated using this approach. These analyses also highlight the richness of basketball networks as a dataset for exploring the relationships between network structure and dynamics with team organization and effectiveness.

  17. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  18. ECUT (Energy Conversion and Utilization Technologies) program: Biocatalysis project

    Science.gov (United States)

    Baresi, Larry

    1989-03-01

    The Annual Report presents the fiscal year (FY) 1988 research activities and accomplishments, for the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Division. The ECUT Biocatalysis Project is managed by the Jet Propulsion Laboratory, California Institute of Technology. The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of universities, industrial companies and government research laboratories. The Project's technical activities were organized into three work elements: (1) The Molecular Modeling and Applied Genetics work element includes research on modeling of biological systems, developing rigorous methods for the prediction of three-dimensional (tertiary) protein structure from the amino acid sequence (primary structure) for designing new biocatalysis, defining kinetic models of biocatalyst reactivity, and developing genetically engineered solutions to the generic technical barriers that preclude widespread application of biocatalysis. (2) The Bioprocess Engineering work element supports efforts in novel bioreactor concepts that are likely to lead to substantially higher levels of reactor productivity, product yields and lower separation energetics. Results of work within this work element will be used to establish the technical feasibility of critical bioprocess monitoring and control subsystems. (3) The Bioprocess Design and Assessment work element attempts to develop procedures (via user-friendly computer software) for assessing the energy-economics of biocatalyzed chemical production processes, and initiation of technology transfer for advanced bioprocesses.

  19. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  20. Team Organization Method Using Salary Auction Game for Sustainable Motivation

    Directory of Open Access Journals (Sweden)

    Sangkyun Kim

    2015-10-01

    Full Text Available In performing team-based projects in engineering class, students usually face many problems, such as free-riding, lack of responsibility, boredom, and insufficient initiative. This papers proposes a new method for performing team-based projects in engineering class—specifically, a gamified method for team organization using a salary auction game. On the description of the design and use of a salary auction game in engineering class, a case study conducted using a survey method is reported to validate the practical value of the proposed auction game. The salary auction game proposed in this paper demonstrates that a gamified team organization method in engineering class could be used as an effective tool to enhance motivation and to improve learning outcomes of engineering students.

  1. Are real teams healthy teams?

    NARCIS (Netherlands)

    Buljac, M.; van Woerkom, M.; van Wijngaarden, P.

    2013-01-01

    This study examines the impact of real-team--as opposed to a team in name only--characteristics (i.e., team boundaries, stability of membership, and task interdependence) on team processes (i.e., team learning and emotional support) and team effectiveness in the long-term care sector. We employed a

  2. The return map: tracking product teams.

    Science.gov (United States)

    House, C H; Price, R L

    1991-01-01

    With a new product, time is now more valuable than money. The costs of conceiving and designing a product are less important to its ultimate success than timeliness to market. One of the most important ways to speed up product development is through interfunctional teamwork. The "Return Map," developed at Hewlett-Packard, provides a way for people from different functions to triangulate on the product development process as a whole. It graphically represents the contributions of all team members to the moment when a project breaks even. It forces the team to estimate and re-estimate the time it will take to perform critical tasks, so that products can get out fast. It subjects the team to the only discipline that works, namely, self-discipline. The map is, in effect, a graph representing time and money, where the time line is divided into three phases: investigation, development, and manufacturing and sales. Meanwhile, costs are plotted against time--as are revenues when they are realized after manufacturing release. Within these points of reference, four novel metrics emerge: Break-Even-Time, Time-to-Market, Break-Even-After-Release, and the Return Factor. All metrics are estimated at the beginning of a project to determine its feasibility, then they are tracked carefully while the project evolves to determine its success. Missed forecasts are inevitable, but managers who punish employees for missing their marks will only encourage them to estimate conservatively, thus building slack into a system meant to eliminate slack. Estimates are a team responsibility, and deviations provide valuable information that spurs continuous investigation and improvement.

  3. Team Learning in Teacher Teams: Team Entitativity as a Bridge between Teams-in-Theory and Teams-in-Practice

    Science.gov (United States)

    Vangrieken, Katrien; Dochy, Filip; Raes, Elisabeth

    2016-01-01

    This study aimed to investigate team learning in the context of teacher teams in higher vocational education. As teacher teams often do not meet all criteria included in theoretical team definitions, the construct "team entitativity" was introduced. Defined as the degree to which a group of individuals possesses the quality of being a…

  4. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams.

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-04-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader's verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time.

  5. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-01-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader’s verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time. PMID:28490856

  6. Geospace exploration project: Arase (ERG)

    Science.gov (United States)

    Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group

    2017-06-01

    The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.

  7. A Kinetic Model Describing Injury-Burden in Team Sports.

    Science.gov (United States)

    Fuller, Colin W

    2017-12-01

    Injuries in team sports are normally characterised by the incidence, severity, and location and type of injuries sustained: these measures, however, do not provide an insight into the variable injury-burden experienced during a season. Injury burden varies according to the team's match and training loads, the rate at which injuries are sustained and the time taken for these injuries to resolve. At the present time, this time-based variation of injury burden has not been modelled. To develop a kinetic model describing the time-based injury burden experienced by teams in elite team sports and to demonstrate the model's utility. Rates of injury were quantified using a large eight-season database of rugby injuries (5253) and exposure (60,085 player-match-hours) in English professional rugby. Rates of recovery from injury were quantified using time-to-recovery analysis of the injuries. The kinetic model proposed for predicting a team's time-based injury burden is based on a composite rate equation developed from the incidence of injury, a first-order rate of recovery from injury and the team's playing load. The utility of the model was demonstrated by examining common scenarios encountered in elite rugby. The kinetic model developed describes and predicts the variable injury-burden arising from match play during a season of rugby union based on the incidence of match injuries, the rate of recovery from injury and the playing load. The model is equally applicable to other team sports and other scenarios.

  8. Leading teaming: Evidence from Jazz

    OpenAIRE

    Araújo, Francisco Maria Trigo da Roza Carvalho

    2013-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics In this research we conducted qualitative analysis to study the team dynamics of jazz combos in order to explore deeper the leadership behaviors in a creative environment where teaming occurs. We found evidence of a dual leader, one that shifts his/her role between ‘leader as leader’ and ‘leader as member’, embracing both leaderfulness an...

  9. Toward a User Driven Innovation for Distributed Software Teams

    Science.gov (United States)

    Hossain, Liaquat; Zhou, David

    The software industry has emerged to include some of the most revolutionized distributed work groups; however, not all such groups achieve their set goals and some even fail miserably. The distributed nature of open source software project teams provides an intriguing context for the study of distributed coordination. OSS team structures have traditionally been geographically dispersed and, therefore, the coordination of post-release activities such as testing are made difficult due to the fact that the only means of communication is via electronic forms, such as e-mail or message boards and forums. Nevertheless, large scale, complex, and innovative software packages have been the fruits of labor for some OSS teams set in such coordination-unfriendly environments, while others end in flames. Why are some distributed work groups more effective than others? In our current communication-enriched environment, best practices for coordination are adopted by all software projects yet some still fall by the wayside. Does the team structure have bearing on the success of the project? How does the communication between the team and external parties affect the project's ultimate success or failure? In this study, we seek to answer these questions by applying existing theories from social networks and their analytical methods in the coordination of defect management activities found in OSS projects. We propose the social network based theoretical model for exploring distributed coordination structures and apply that for the case of the OSS defect management process for exploring the structural properties, which induce the greatest coordination performance. The outcome suggests that there is correlation between certain network measures such as density, centrality, and betweenness and coordination performance measures of defect management systems such as quality and timeliness.

  10. Teaming up to improve reliability

    International Nuclear Information System (INIS)

    Malone, E.A.; Ayres, D.J.; Lear, R.C. van

    1989-01-01

    Responding to increasingly stringent regulatory requirements, Babcock and Wilcox has teamed up with three specialist companies to provide services for nuclear utilities aiming to improve the performance of their valves and actuators. The services, which are outlined here, include inspection, repair, overhaul and valve and actuator reliability programmes. (author)

  11. Exploration of Team Integration in Spanish Multifamily Residential Building Construction

    OpenAIRE

    Pellicer, Eugenio; Sanz Benlloch, María Amalia; Esmaeili, B.; MOLENAAR, KEITH ROBERT

    2016-01-01

    Project delivery team integration generally involves early involvement of general contractors and key specialty contractors in the design process. Team integration has been found to improve an owner’s probability of success. However, during difficult economic times, owners can forego early team involvement and move toward low bid procurement to take advantage of competitive markets. This study explores the performance of integrated teams in the Spanish multifamily building constructi...

  12. Students' perceptions of the interprofessional team in practice through the application of servant leadership principles.

    Science.gov (United States)

    Neill, Mark; Hayward, Karen S; Peterson, Teri

    2007-08-01

    This study examined students' perceptions of interprofessional practice within a framework of servant leadership principles, applied in the care of rural older adults utilizing a service learning model. Mobile wellness services were provided through the Idaho State University Senior Health Mobile project in a collaborative team approach in the community-based setting. Students from varied health professional programs were placed in teams for the provision of wellness care, with communication among team members facilitated by a health professions faculty member serving as field coordinator. The Interdisciplinary Education Perception Scale (IEPS) was used to measure students' perceptions of interprofessional practice using a pretest post-test research design. Multivariate analysis was performed revealing a significant pretest to post-test effect on students' perceptions as measured by factors inherent in the IEPS and deemed essential to effective interprofessional practice. Univariate analysis revealed a significant change in students' perception of professional competence and autonomy, actual cooperation and resource sharing within and across professions, and an understanding of the value and contributions of other professionals from pretest to post-test.

  13. Trauma team activation: Not just for trauma patients

    Directory of Open Access Journals (Sweden)

    Phoenix Vuong

    2017-01-01

    Full Text Available Specialized trauma teams have been shown to improve outcomes in critically injured patients. At our institution, an the American College of Surgeons Committee on trauma level I Trauma center, the trauma team activation (TTA criteria includes both physiologic and anatomic criteria, but any attending physician can activate the trauma team at their discretion outside criteria. As a result, the trauma team has been activated for noninjured patients meeting physiologic criteria secondary to nontraumatic hemorrhage. We present two cases in which the trauma team was activated for noninjured patients in hemorrhagic shock. The utilization of the TTA protocol and subsequent management by the trauma team are reviewed as we believe these were critical factors in the successful recovery of both patients. Beyond the primary improved survival outcomes of severely injured patients, trauma center designation has a “halo effect” that encompasses patients with nontraumatic hemorrhage.

  14. The use of a rehabilitation team for stroke patients.

    Science.gov (United States)

    Pendarvis, J F; Grinnell, R M

    1980-01-01

    A multidisciplinary team affiliated with a large urban hospital is described and evaluated with respect to its effects on stroke patients. Twenty-six patients who had been referred to the team in a 7-month period were compared with a group of 32 patients who had not been referred to the team. Patients were evaluated on the basis of their scores on a functional health scale mailed to them 3 months after their discharge from the hospital. The results of this project indicate that patients seen by the team scored higher on functional health than those not seen by the team.

  15. 77 FR 34033 - Public Utility District No. 1 of Douglas County; Notice of Authorization for Continued Project...

    Science.gov (United States)

    2012-06-08

    ... District No. 1 of Douglas County; Notice of Authorization for Continued Project Operation On May 27, 2010, the Public Utility District No. 1 of Douglas County, licensee for the Wells Hydroelectric Project... regulations thereunder. The Wells Hydroelectric Project is located on the Columbia River in Douglas, Okanogan...

  16. Investigating the effects of time pressure on new product development teams

    NARCIS (Netherlands)

    Chong, D.S.F.

    2010-01-01

    The need for innovation has led high-technology organizations to use project teams as the method of choice to bring new products to market under demanding schedules. Adopting a team approach, however, is not always fruitful and often depends on whether team members can work effectively together.

  17. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-10-01

    Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated. This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering. The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging service and multimedia messaging service (SMS & MMS or what some people refer to as ‘texting’, and email were mainly used to share knowledge and were perceived to reduce knowledge transfer time more than voice facilities. Our findings indicate that most students do not utilise the affordances of mobile phones for tacit knowledge transfer. Sharing of tacit knowledge needs to be encouraged

  18. Professional Team Foundation Server 2012

    CERN Document Server

    Blankenship, Ed; Holliday, Grant; Keller, Brian

    2012-01-01

    A comprehensive guide to using Microsoft Team Foundation Server 2012 Team Foundation Server has become the leading Microsoft productivity tool for software management, and this book covers what developers need to know to use it effectively. Fully revised for the new features of TFS 2012, it provides developers and software project managers with step-by-step instructions and even assists those who are studying for the TFS 2012 certification exam. You'll find a broad overview of TFS, thorough coverage of core functions, a look at extensibility options, and more, written by Microsoft ins

  19. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  20. Strengths, weaknesses, opportunities and threats of virtual team in Nigerian construction industry

    Directory of Open Access Journals (Sweden)

    Odubiyi Tawakalitu Bisola

    2016-12-01

    Full Text Available The rationale behind any construction project varies; it might be to achieve value, time, quality, cost or just satisfaction for the client. Irrespective of any or all of these reasons, the team members involved in conception, inception, construction and delivery of a project are aware that a good teamwork is of essence. This is in the context of growing needs of client and the ever-growing improvement in methods of project delivery as influenced by technology. This article looks into the team type in the Nigerian construction industry from the angle of a virtual team (VT using the mixed-method research design. VT is simply a type of team wherein the members operate from different geographical regions and function majorly with the aid of information and communications technology media. Data for the study were collected from relevant literature, interviews were conducted with 20 selected professionals in the construction industry and, thereafter, a questionnaire was drafted from the results of the interviews and administered to selected relevant professionals. The study revealed that communication among team members, flexibility of operation and decision making are usually the most influencing strengths of the VT, while some of its weaknesses are a need for special training, conflict among team members and client’s acceptance of team type. Reduction in time-to-market, collaboration ability of team members and delivery time of project were seen as opportunities, while recognized threats were members’ performance level and complexity of technical application. The study concludes that the success of the VT depends highly on exploiting the opportunities opened to it.

  1. Virginia Solar Pathways Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Katharine; Cosby, Sarah

    2018-03-28

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments. The U.S. Department of Energy (DOE) funding award enabled DEV to take a focused approach to developing the Solar Strategy for its Virginia service territory. The structure and funding from the DOE award also facilitated valuable input from a formal stakeholder team convened to serve as advisors (Advisory Team) to the VSPP and contribute their perspectives and expertise to both the analysis and strategy development aspects of the Project. The development of the Solar Strategy involved three main goals: • Establish a policy and program framework that would integrate existing solar programs with new options appropriate for the Commonwealth’s policy environment and broader economic development objectives; • Promote wider deployment of solar within a low retail electric rate environment; and • Serve as a sustainable, utility-administered solar model that could be replicated in other states with similar policy environments, including, but not limited to, the entire Southeast region. In support of the VSPP goals, the Project Team commissioned four studies to support the Solar Strategy development. Two studies, completed by Navigant Consulting, focused on the integration of solar into the electric grid. The first solar integration study focused on integration of solar into the distribution grid where the utility system directly connects to and serves end-use customers

  2. Intelligent Virtual Assistant's Impact on Technical Proficiency within Virtual Teams

    Science.gov (United States)

    Graham, Christian; Jones, Nory B.

    2016-01-01

    Information-systems development continues to be a difficult process, particularly for virtual teams that do not have the luxury of meeting face-to-face. The research literature on this topic reinforces this point: the greater part of database systems development projects ends in failure. The use of virtual teams to complete projects further…

  3. Affective mechanisms linking dysfunctional behavior to performance in work teams : a moderated mediation study

    NARCIS (Netherlands)

    Cole, M.S.; Walter, F.; Bruch, H.

    The present study examines the association between dysfunctional learn behavior and team performance. Data included measures of teams' dysfunctional behavior and negative affective tone as well as supervisors' ratings of teams' (nonverbal) negative emotional expressivity and performance. Utilizing a

  4. Utility industry evaluation of the Modular High-Temperature Gas-Cooled Reactor

    International Nuclear Information System (INIS)

    Burstein, S.; Bitel, J.S.; Tramm, T.R.; High, M.D.; Neils, G.H.; Tomonto, J.R.; Weinberg, C.J.

    1990-02-01

    A team of utility industry representatives evaluated the Modular High Temperature Gas-Cooled Reactor plant design, a current design created by an industrial team led by General Atomics under Department of Energy sponsorship and with support provided by utilities through Gas-Cooled Reactor Associates. The utility industry team concluded that the plant design should be considered a viable application of an advanced nuclear concept and deserves continuing development. Specific comments and recommendations are provided as a contribution toward improving a very promising plant design. 2 refs

  5. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  6. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  7. Intellectual Data Analysis Method for Evaluation of Virtual Teams

    Directory of Open Access Journals (Sweden)

    Sandra Strigūnaitė

    2013-01-01

    Full Text Available The purpose of the article is to present a method for virtual team performance evaluation based on intelligent team member collaboration data analysis. The motivation for the research is based on the ability to create an evaluation method that is similar to ambiguous expert evaluations. The concept of the hierarchical fuzzy rule based method aims to evaluate the data from virtual team interaction instances related to implementation of project tasks. The suggested method is designed for project managers or virtual team leaders to help in virtual teamwork evaluation that is based on captured data analysis. The main point of the method is the ability to repeat human thinking and expert valuation process for data analysis by applying fuzzy logic: fuzzy sets, fuzzy signatures and fuzzy rules. The fuzzy set principle used in the method allows evaluation criteria numerical values to transform into linguistic terms and use it in constructing fuzzy rules. Using a fuzzy signature is possible in constructing a hierarchical criteria structure. This structure helps to solve the problem of exponential increase of fuzzy rules including more input variables. The suggested method is aimed to be applied in the virtual collaboration software as a real time teamwork evaluation tool. The research shows that by applying fuzzy logic for team collaboration data analysis it is possible to get evaluations equal to expert insights. The method includes virtual team, project task and team collaboration data analysis. The advantage of the suggested method is the possibility to use variables gained from virtual collaboration systems as fuzzy rules inputs. Information on fuzzy logic based virtual teamwork collaboration evaluation has evidence that can be investigated in the future. Also the method can be seen as the next virtual collaboration software development step.

  8. AA magnet measurement team

    CERN Multimedia

    CERN PhotoLab

    1978-01-01

    Quickly improvised measurement equipment for the AA (Antiproton Accumulator) was all the tight schedule permitted, but the high motivation of the team made up for the lack of convenience. From left to right: Roy Billinge (Joint AA Project Leader, the other one was Simon van der Meer); Bruno Autin, Brian Pincott, Colin Johnson.

  9. A Method for Knowledge Management and Communication Within and Across Multidisciplinary Teams

    Directory of Open Access Journals (Sweden)

    Don Flynn

    2009-06-01

    Full Text Available The use of knowledge management (KM and communication tools in an applied scientific arena where research is performed and knowledge must be managed within and across multidisciplinary teams and organizations is a challenge. Teams of scientists and engineers from up to 17 different technical specialties required knowledge management tools for developing multiple environmental impact statements under challenging circumstances. Factors that contributed to the success of the KM tools included 1 pairing of project staff with Knowledge Systems staff to determine system requirements, 2 the use of the tools by the team as they were being developed thus allowing many opportunities for feedback and interaction, 3 developing the tools to approximate the overall project structure and work flow already in place, 4 providing immediate assistance to the project team as they learned to use the new KM tools, and 5 replacing earlier practices with the new KM approach by "burning the bridges" to past practices after the team had learned to use the new KM tools.

  10. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  11. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  12. Shared Leadership Improves Team Novelty: The Mechanism and Its Boundary Condition

    Science.gov (United States)

    Sun, Xiaomin; Jie, Yuan; Wang, Yilu; Xue, Gang; Liu, Yan

    2016-01-01

    Previous research has revealed the significant impact of shared leadership on team creativity, yet the mechanism underlying this relationship has rarely been investigated. The current research examined how shared leadership influenced team creativity (novelty and usefulness) across 3 studies using both long-term project teams and temporal task teams in the laboratory. The results showed that shared leadership enhanced the novelty dimension of team creativity by improving constructive controversy. Furthermore, team goal orientation moderated this effect. The indirect effect of constructive controversy holds for teams with learning goal orientation but not for those with performance goal orientation. Such patterns were not found in the usefulness dimension of team creativity. PMID:28066289

  13. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-03-01

    Full Text Available Group learning plays a key role in the transfer of knowledge. In institutions of learning, it enhances students’ understanding, critical thinking, integration of knowledge and knowledge sharing. However, the transfer of knowledge in group projects is often impeded by factors such as time and budget constraints, individual and social barriers, and a lack of motivation.Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated.This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering.The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging

  14. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  15. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  16. Strategic leadership of portfolio and project management

    CERN Document Server

    Kloppenborg, Timothy J

    2014-01-01

    As an executive in today's economy, your organization may have limited resources and bench strength. How can you and other leaders make the most of your company's assets? This book will instruct you and your leadership teams on implementing strategy through identifying, selecting, prioritizing, resourcing, and governing an optimal combination of projects and other work. Inside, you'll learn how to sponsor every project stage, as well as instruct your project managers and direct reports to follow your lead. Detailed advice is given for project management competency on utilizing input from customers, employees, and processes. Much of your organization's work is probably dependent on information technology and understanding and using information technology as a strategic weapon, and with this book, you'll learn how your organization can become competitive and how to effectively implement smart business strategies. This book outlines how these portfolio and project decisions have to be made based on both qualitat...

  17. Evaluation of an Initiative for Fostering Provider-Pharmacist Team Management of Hypertension in Communities

    OpenAIRE

    William R. Doucette; Cailin Lickteig; Stevie Veach; Barry Carter; Barcey Levy

    2014-01-01

    Objectives: 1) Conduct team building activities for provider-community pharmacist teams in small communities and 2) Determine the impact of the team approach on practitioner-reported consequences and 3) Identify obstacles to the team approach and ways to overcome them. Methods: Eleven provider-pharmacist teams were recruited in rural/micropolitan communities in Iowa. The teams participated in team building sessions facilitated by the project leaders, to discuss the team approach. Decisio...

  18. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  19. A Systematic Review of Developing Team Competencies in Information Systems Education

    Science.gov (United States)

    Figl, Kathrin

    2010-01-01

    The ability to work effectively in teams has been a key competence for information systems engineers for a long time. Gradually, more attention is being paid to developing this generic competence as part of academic curricula, resulting in two questions: how to best promote team competencies and how to implement team projects successfully. These…

  20. Developing Expert Teams with a Strong Safety Culture

    Science.gov (United States)

    Rogers, David G.

    2010-01-01

    Would you like to lead a world renowned team that draws out all the talents and expertise of its members and consistently out performs all others in the industry? Ever wonder why so many organizations fail to truly learn from past mistakes only to repeat the same ones at a later date? Are you a program/project manager or team member in a high-risk organization where the decisions made often carry the highest of consequences? Leadership, communication, team building, critical decision-making and continuous team improvement skills and behaviors are mere talking points without the attitudes, commitment and strategies necessary to make them the very fabric of a team. Developing Expert Teams with a Strong Safety Culture, will provide you with proven knowledge and strategies to take your team soaring to heights you may have not thought possible. A myriad of teams have applied these strategies and techniques within their organization team environments: military and commercial aviation, astronaut flight crews, Shuttle flight controllers, members of the Space Shuttle Program Mission Management Team, air traffic controllers, nuclear power control teams, surgical teams, and the fire service report having spectacular success. Many industry leaders are beginning to realize that although the circumstances and environments of these teams may differ greatly to their own, the core elements, governing principles and dynamics involved in managing and building a stellar safety conscious team remain identical.

  1. Peer mentored teams to support undergraduate group work in higher education

    Science.gov (United States)

    Cinderey, Lynn Elizabeth

    This research starts with a set of practical research questions to investigate a problem which occurs in some computing undergraduate modules that use group work as part of the learning and assessment strategy. In this study final year students with experience in information systems project work and trained in team processes met with small groups of first year computing students with the aim of turning the first year project group into a team. This study seeks to explore the experience of the final year students as they take on the role of peer tutor looking at the problems they perceive within the first year teams and the skills and knowledge they use to help them. The study includes the recruitment and training of final year students (n=9) and allocation to first year teams. The final year students acted as co-researchers and team leaders in L4 Information Systems project work and recorded their thoughts and observations in a diary during the first semester of 2008/9 academic year. Diary data was supplemented by interview data from a sample of final year students (n=4). The sample was selected based on the richness of the data provided in the diaries and the number of meetings held with their teams. Rich data and thick descriptions were essential for a phenomenological examination of the experience of the final year students. A number of findings emerged. A critical approach to analysis revealed ongoing conflicts occurred across cultural divides within the first year teams that final year leaders did not articulate or appear fully aware of. This had important implications for individual team members. Other findings which relate to issues of changing levels of motivation in the teams over the ten weeks, roles adopted by the leaders, ability to systematize the project or team processes and the ability to reflect on unsuccessful strategies also had implications for peer mentoring training and support. The picture that emerged from the data suggested that lack of

  2. 40 CFR 262.90 - Project XL for Public Utilities in New York State.

    Science.gov (United States)

    2010-07-01

    ... compliance history or other appropriate factors. (f) At any time, a Utility may add or remove UCCF... following information: (i) A brief description of the XL project, the intended new use of the facility, and... compliance history or other appropriate factors, the acknowledgment may impose conditions in addition to...

  3. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  4. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

  5. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  6. Evaluation of the Parent-Implemented Communication Strategies (PiCS) Project Using the Multiattribute Utility (MAU) Approach

    Science.gov (United States)

    Stoner, Julia B.; Meadan, Hedda; Angell, Maureen E.; Daczewitz, Marcus

    2012-01-01

    We conducted a multiattribute utility (MAU) evaluation to assess the Parent-Implemented Communication Strategies (PiCS) project which was funded by the Institute of Education Sciences (IES). In the PiCS project parents of young children with developmental disabilities are trained and coached in their homes on naturalistic and visual teaching…

  7. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  8. Assessment and Management of Psychosocial Needs: Social Work Utilization in Comprehensive Cleft Team Care.

    Science.gov (United States)

    Kaye, Alison; Lybrand, Sandra; Chew, William L

    2018-01-01

    To determine family-reported psychosocial stressors and social worker assessments and interventions within a comprehensive cleft team. Single-institution prospective provider-completed survey. Four hundred one families seen by cleft team social worker over a 7-month period. Most families (n = 331; 83%) participated in the team social work assessment. At least 1 active psychosocial stressor was reported by 238 (72%) families, with 63 (19%) families reported 3 or more stressors. There were 34 types of stressors reported. Most common were financial strain, young age of patient, new cleft diagnosis, and distance from clinic (57% of families live over an hour away). Family structure and home environment were assessed in detail for 288 (87%) families. Detailed assessments for access to care and behavioral/developmental issues also figured prominently. Social work interventions were provided in 264 (80%) of the visits, of which 91 were for families of new patients with over half who had infants less than 3 months old. Of the 643 interventions provided, the most frequent were parent mental health screens and counseling, early intervention referrals, transportation assistance, securing local hotel discounts, orthodontic referrals, and orthodontic cost coverage. Approximately 10% of encounters required follow-up contact related to the psychosocial concerns identified in clinic. The inclusion of a cleft team social worker is a critical component of comprehensive cleft team care as evidenced by the large proportion of families who required assistance. Ongoing social work assessments are recommended for each patient to help address the variety of psychosocial stressors families face.

  9. Perturbed Communication in a Virtual Environment to Train Medical Team Leaders

    OpenAIRE

    Huguet , Lauriane; Lourdeaux , Domitile; Sabouret , Nicolas; Ferrer , Marie-Hélène

    2016-01-01

    International audience; The VICTEAMS project aims at designing a virtual environment for training medical team leaders to non-technical skills. The virtual environment ispopulated with autonomous virtual agents who are able to make mistakes (in action or communication) in order to train rescue team leaders and to make them adaptive with all kinds of situations or teams.

  10. Assessing and evaluating multidisciplinary translational teams: a mixed methods approach.

    Science.gov (United States)

    Wooten, Kevin C; Rose, Robert M; Ostir, Glenn V; Calhoun, William J; Ameredes, Bill T; Brasier, Allan R

    2014-03-01

    A case report illustrates how multidisciplinary translational teams can be assessed using outcome, process, and developmental types of evaluation using a mixed-methods approach. Types of evaluation appropriate for teams are considered in relation to relevant research questions and assessment methods. Logic models are applied to scientific projects and team development to inform choices between methods within a mixed-methods design. Use of an expert panel is reviewed, culminating in consensus ratings of 11 multidisciplinary teams and a final evaluation within a team-type taxonomy. Based on team maturation and scientific progress, teams were designated as (a) early in development, (b) traditional, (c) process focused, or (d) exemplary. Lessons learned from data reduction, use of mixed methods, and use of expert panels are explored.

  11. The Effects of Integrating On-Going Training for Technical Documentation Teams

    Science.gov (United States)

    Catanio, Joseph T.; Catanio, Teri L.

    2010-01-01

    The tools and techniques utilized in the technical communications profession are constantly improving and changing. Information Technology (IT) organizations devote the necessary resources to equip and train engineering, marketing, and sales teams, but often fail to do so for technical documentation teams. Many IT organizations tend to view…

  12. Proceedings of the second Atmospheric Radiation Measurement (ARM) Science Team Meeting

    International Nuclear Information System (INIS)

    1992-12-01

    The second Atmospheric Radiation Measurement (ARM) Science Team Meeting was held in Denver, Colorado, in October 1991. The five-day meeting provided a forum for a technical exchange among the members of the ARM Science Team and a discussion of the technical aspects of the project infrastructure. The meeting included several activities: Science Team presentations, discussions of the first site occupation plan, experiment design sessions, and poster sessions. This Proceedings document includes papers presented at the meeting. The papers included are those from the technical sessions, the experiment design sessions, the first site occupation, and descriptions of locales for future sites. Individual projects are processed separately for the database

  13. Utility-Scale Solar 2016: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark; Seel, Joachim; LaCommare, Kristina Hamachi

    2017-09-19

    The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2016, the utility-scale sector installed more than 2.5 times as much new capacity as did the residential and commercial sectors combined, and is expected to maintain its dominant position for at least another five years. This report—the fifth edition in an ongoing annual series—provides data-driven analysis of the utility-scale solar project fleet in the United States. We analyze not just installed project prices, but also operating costs, capacity factors, and power purchase agreement ("PPA") prices from a large sample of utility-scale PV and CSP projects throughout the United States. Highlights from this year's edition include the following: Installation Trends: The use of solar tracking devices dominated 2016 installations, at nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the Southwest, the median long-term average insolation level at newly built project sites declined again in 2016. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio has stabilized in 2016 at 1.3 for both tracking and fixed-tilt projects. Installed Prices: Median installed PV project prices within a sizable sample have fallen by two-thirds since the 2007-2009 period, to $2.2/WAC (or $1.7/WDC) for projects completed in 2016. The lowest 20th percentile of projects within our 2016 sample were priced at or below $2.0/WAC, with the lowest-priced projects around $1.5/WAC. Overall price dispersion across the entire sample and across geographic regions decreased significantly in 2016. Operation and Maintenance (“O&M”) Costs: What limited empirical O&M cost data are publicly available suggest that PV O&M costs were in the neighborhood of $18/kWAC-year, or $8/MWh, in 2016. These

  14. AMAT guidelines. Reference document for the IAEA Ageing Management Assessment Teams (AMATs)

    International Nuclear Information System (INIS)

    1999-01-01

    Effective ageing management is an important element for ensuring the safety of nuclear power plant. The IAEA Ageing Management Assessment Team (AMAT) programme provides advice and assistance to utilities or individual NPPs to strengthen and enhance the effectiveness of ageing management programs (AMPs). Such AMPs are required by an increasing number of safety utilities and implemented by an increasing number of utilities, often as a part of NPP life or life cycle management programs that involve the integration of ageing management and economic planning. The guidelines in this report are primarily intended for IAEA-led AMAT team members as a basic structure and common reference for peer reviews of AMPs

  15. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  16. Exploring Students' Acceptance of Team Messaging Services: The Roles of Social Presence and Motivation

    Science.gov (United States)

    Huang, Yong-Ming

    2017-01-01

    Team messaging services represent a type of cloud computing applications that support not only the messaging among users but also the collaboration in a team. Accordingly, team messaging services have great potential to facilitate students' collaboration. However, only few studies utilized such services to support students' collaboration and…

  17. How to Begin a Quality Improvement Project.

    Science.gov (United States)

    Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T

    2016-05-06

    Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American

  18. The Tiger Team Process in the Rebaselining of the Plutonium Finishing Plant (PFP)

    International Nuclear Information System (INIS)

    BAILEY, R.W.

    2000-01-01

    This paper will describe the integrated, teaming approach and planning process utilized by the Tiger Team in the development of the IPMP. This paper will also serve to document the benefits derived from this implementation process

  19. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  20. The importance of trust in virtual team knowledge mediation

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    For transnational companies, virtual project teams are a means of overcoming temporal, geographical and organizational boundaries between team members. However, because the level of knowledge communication has been shown to be influenced by trust (e.g. Staples & Webster 2008; Quigley, Tesluk, Locke......, and will examine how the corporate context, consisting of embedded cultures, corporate structures and orgamizational communities of practice (CoP) support relationships, identity, trust and knowledge communication. According to the literature review on virtual teams conducted by Martins, Gilson & Maynard (2004...

  1. 15 MW HArdware-in-the-loop Grid Simulation Project

    Energy Technology Data Exchange (ETDEWEB)

    Rigas, Nikolaos [Clemson Univ., SC (United States); Fox, John Curtiss [Clemson Univ., SC (United States); Collins, Randy [Clemson Univ., SC (United States); Tuten, James [Clemson Univ., SC (United States); Salem, Thomas [Clemson Univ., SC (United States); McKinney, Mark [Clemson Univ., SC (United States); Hadidi, Ramtin [Clemson Univ., SC (United States); Gislason, Benjamin [Clemson Univ., SC (United States); Boessneck, Eric [Clemson Univ., SC (United States); Leonard, Jesse [Clemson Univ., SC (United States)

    2014-10-31

    The 15MW Hardware-in-the-loop (HIL) Grid Simulator project was to (1) design, (2) construct and (3) commission a state-of-the-art grid integration testing facility for testing of multi-megawatt devices through a ‘shared facility’ model open to all innovators to promote the rapid introduction of new technology in the energy market to lower the cost of energy delivered. The 15 MW HIL Grid Simulator project now serves as the cornerstone of the Duke Energy Electric Grid Research, Innovation and Development (eGRID) Center. This project leveraged the 24 kV utility interconnection and electrical infrastructure of the US DOE EERE funded WTDTF project at the Clemson University Restoration Institute in North Charleston, SC. Additionally, the project has spurred interest from other technology sectors, including large PV inverter and energy storage testing and several leading edge research proposals dealing with smart grid technologies, grid modernization and grid cyber security. The key components of the project are the power amplifier units capable of providing up to 20MW of defined power to the research grid. The project has also developed a one of a kind solution to performing fault ride-through testing by combining a reactive divider network and a large power converter into a hybrid method. This unique hybrid method of performing fault ride-through analysis will allow for the research team at the eGRID Center to investigate the complex differences between the alternative methods of performing fault ride-through evaluations and will ultimately further the science behind this testing. With the final goal of being able to perform HIL experiments and demonstration projects, the eGRID team undertook a significant challenge with respect to developing a control system that is capable of communicating with several different pieces of equipment with different communication protocols in real-time. The eGRID team developed a custom fiber optical network that is based upon FPGA

  2. Evaluation of a Pilot Project to Introduce Simulation-Based Team Training to Pediatric Surgery Trauma Room Care

    Directory of Open Access Journals (Sweden)

    Markus Lehner

    2017-01-01

    Full Text Available Introduction. Several studies in pediatric trauma care have demonstrated substantial deficits in both prehospital and emergency department management. Methods. In February 2015 the PAEDSIM collaborative conducted a one and a half day interdisciplinary, simulation based team-training course in a simulated pediatric emergency department. 14 physicians from the medical fields of pediatric surgery, pediatric intensive care and emergency medicine, and anesthesia participated, as well as four pediatric nurses. After a theoretical introduction and familiarization with the simulator, course attendees alternately participated in six simulation scenarios and debriefings. Each scenario incorporated elements of pediatric trauma management as well as Crew Resource Management (CRM educational objectives. Participants completed anonymous pre- and postcourse questionnaires and rated the course itself as well as their own medical qualification and knowledge of CRM. Results. Participants found the course very realistic and selected scenarios highly relevant to their daily work. They reported a feeling of improved medical and nontechnical skills as well as no uncomfortable feeling during scenarios or debriefings. Conclusion. To our knowledge this pilot-project represents the first successful implementation of a simulation-based team-training course focused on pediatric trauma care in German-speaking countries with good acceptance.

  3. Team CANDU : ready for the marketplace

    International Nuclear Information System (INIS)

    Howieson, J.Q.

    2007-01-01

    This paper outlines the partnership between AECL and a number of leading global nuclear suppliers to market the Candu power reactor. The mission of the CANDU team is to develop market opportunities for CANDU technology and deliver successful CANDU projects

  4. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  5. Utility and assessment of non-technical skills for rapid response systems and medical emergency teams.

    Science.gov (United States)

    Chalwin, R P; Flabouris, A

    2013-09-01

    Efforts are ongoing to improve outcomes from cardiac arrest and medical emergencies. A promising quality improvement modality is use of non-technical skills (NTS) that aim to address human factors through improvements in performance of leadership, communication, situational awareness and decision-making. Originating in the airline industry, NTS training has been successfully introduced into anaesthesia, surgery, emergency medicine and other acute medical specialities. Some aspects of NTS have already achieved acceptance for cardiac arrest teams. Leadership skills are emphasised in advanced life support training and have shown favourable results when employed in simulated and clinical resuscitation scenarios. The application of NTS in medical emergency teams as part of a rapid response system attending medical emergencies is less certain; however, observations of simulations have also shown promise. This review highlights the potential benefits of NTS competency for cardiac arrest teams and, more importantly, medical emergency teams because of the diversity of clinical scenarios encountered. Discussion covers methods to assess and refine NTS and NTS training to optimise performance in the clinical environment. Increasing attention should be applied to yielding meaningful patient and organisational outcomes from use of NTS. Similarly, implementation of any training course should receive appropriate scrutiny to refine team and institutional performance. © 2013 The Authors; Internal Medicine Journal © 2013 Royal Australasian College of Physicians.

  6. Performance Management and Sourcing Team Behaviour - Working Paper

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    The purpose of this development paper is to outline the main ideas of a Ph.d.-project research proposal,which deals with the influence of Performance Management on the behaviour and decisions of Sourcing Category Team members. The background for the project is described, as well as the main theory...

  7. Waste hydrogen utilization project receives $12 M in federal support

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2005-10-01

    This article announced that $12.2 million dollars in federal funding support, over a 3 year period, will be made available to Sacre-Davey Innovations to support the development and demonstration of the Integrated Waste Hydrogen Utilization Project (IWHUP). The IWHUP is a clean energy project that will develop and demonstrate the feasibility of using hydrogen generated as a byproduct of a sodium chlorate manufacturing plant in North Vancouver. Greenhouse gas emissions and fossil fuels will be reduced by using purified hydrogen to fuel vehicles. The full hydrogen value chain will also be demonstrated by the IWHUP. This includes the supply, storage, distribution and use of hydrogen. Eight light-duty trucks running on hydrogen will be included in the demonstration, along with 4 public transit buses converted to run on a combination of compressed natural gas and hydrogen, and a fuel cell system operating on hydrogen while providing electrical power to a car wash. The newsletter article discussed the funding leveraged from various sources as well as the names of project participants. The article also mentioned that the IWHUP fuel station in North Vancouver will play a key role in sustainable transportation demonstrations during the 2010 Olympic and Paralympic Winter Games in Vancouver.

  8. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Science.gov (United States)

    Van Hooft, Edwin A. J.; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination. PMID:29674991

  9. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Directory of Open Access Journals (Sweden)

    Edwin A. J. Van Hooft

    2018-04-01

    Full Text Available Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  10. Team Learning and Team Composition in Nursing

    Science.gov (United States)

    Timmermans, Olaf; Van Linge, Roland; Van Petegem, Peter; Elseviers, Monique; Denekens, Joke

    2011-01-01

    Purpose: This study aims to explore team learning activities in nursing teams and to test the effect of team composition on team learning to extend conceptually an initial model of team learning and to examine empirically a new model of ambidextrous team learning in nursing. Design/methodology/approach: Quantitative research utilising exploratory…

  11. The Research of Self-Management Team and Superior-Direction Team in Team Learning Influential Factors

    OpenAIRE

    Zhang Wei

    2013-01-01

    Team learning is a cure for bureaucracy; it facilitates team innovation and team performance. But team learning occurs only when necessary conditions were met. This research focused on differences of team learning influential factors between self-management team and superior-direction team. Four variables were chosen as predictors of team learning though literature review and pilot interview. The 4 variables are team motivation, team trust, team conflict and team leadership. Selected 54 self ...

  12. The impact of team familiarity and team leader experience on team coordination errors: A panel analysis of professional basketball teams

    NARCIS (Netherlands)

    Sieweke, Jost; Zhao, B.

    2015-01-01

    To explore the dynamics involved in team coordination, we examine the impact of team familiarity and team leader experience on team coordination errors (TCEs). We argue that team familiarity has a U-shaped effect on TCEs. We study the moderating effects of team leader prior experience and team

  13. Utility applications and broadband networks

    Energy Technology Data Exchange (ETDEWEB)

    Chebra, R.; Taylor, P.

    2003-02-01

    A detailed analytical model of a cable network that would be capable of providing utilities with such services as automatic meter reading, on-line ability to remotely connect and disconnect commodity service, outage notification, tamper detection, direct utility-initiated load control, indirect user prescribed load control, and user access to energy consumption information, is described. The paper provides an overview of of the zones of focus that must be addressed -- market assessment, competitive analysis, product identification, economic model development, assessment of skill set requirements, performance monitoring and tracking, and various technical issues -- to identify any gaps in the organisation's ability to fully develop such a plan. Developers of the model field tested it in 1995 using some benchmarks that were available at that time, and found that the benefit afforded by direct labor saving was not sufficient to cover the capital expenditure of the advanced utility gateway connected to the cable network. However, since 1995 the unanticipated shift in the derived consumer value from a host of cable-based communications services has rendered these original projections irrelevant. Since national communications organizations concentrate on 'tier one' or at best 'tier two' cities (roughly corresponding to the NFL franchise cities and baseball farm team cities), the uncovered rural and suburban areas of the country create a significant digital divide within the population. The developers of the model contend that these unserviced areas provide utilities, especially municipal utilities, with an excellent opportunity to step into the gap and provide a full range of services that includes water, electricity and communications. The proposed model provides the foundation for utilities upon which to base their ultimate implementation decisions.

  14. Improving motivation and engagement in core engineering courses with student teams

    Science.gov (United States)

    Trenshaw, Kathryn Faye

    Team-based projects are common in capstone engineering design courses and increasingly common in first-year engineering programs. Despite high enrollments and budget cutbacks affecting many programs, second- and third-year students can also benefit from team-based project experiences, which motivate them to succeed in engineering and prepare them for a globally competitive workforce. My dissertation research demonstrates that team design projects can be incorporated into the curricula of engineering departments, and these projects result in positive affective outcomes for students. Using ABET outcomes and Self Determination Theory (SDT) as the background for my studies, I investigated students' confidence, motivation, and sense of community after experiencing team design projects in two different engineering departments at a large public institution. In the first study, I used a sequential mixed methods approach with a primary quantitative phase followed by an explanatory qualitative phase to evaluate a chemical engineering program that integrated team design projects throughout the curriculum. The evaluation methods included a survey based on desired ABET outcomes for students and focus groups to expand on the quantitative results. Students reported increased confidence in their design, teamwork, and communication skills after completing the projects. In my second and third studies, I used qualitative interviews based on SDT to explore student motivation in an electrical and computer engineering course redesigned to support students' intrinsic motivation to learn. SDT states that intrinsic motivation to learn is supported by increasing students' sense of autonomy, competence, and relatedness in regard to their learning. Using both narrative inquiry and phenomenological methodologies, I analyzed data from interviews of students for mentions of autonomy, competence, and relatedness as well as course events that were critical in changing students' motivation

  15. Utility-Scale Solar 2013: An empirical analysis of project cost, performance, and pricing trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Weaver, Samantha [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-09-17

    Other than the SEGS I-IX parabolic trough projects built in the 1980s, virtually no large-scale or "utility-scale" solar projects-defined here to include any ground-mounted photovoltaic ("PV"), concentrating photovoltaic ("CPV"), or concentrating solar power ("CSP" or solar thermal) project larger than 5 MWAC-existed in the United States prior to 2007.

  16. Team Building OD Interventions and Outcomes in a Public School.

    Science.gov (United States)

    Patterson, Wade N.; DeVille, Anthony P.

    This paper describes a study of an organization development intervention with an eight-person teaching-support-administrative team in a suburban elementary school. Data for the study were gathered through observation by two participant-observers, through interviews with all eight direct participants in the team-building project, and through a…

  17. Team Satisfaction and Student Group Performance: A Cross-Cultural Study

    Science.gov (United States)

    Zeitun, Rami M.; Abdulqader, Khalid Shams; Alshare, Khaled A.

    2013-01-01

    The authors examined the relationship between team satisfaction and students' performance in group projects in two universities, one from the United States and one from Qatar. The results showed that there is a significant positive correlation between team satisfaction and group performance only for the American students. Demographic factors such…

  18. Review: Christine von Blanckenburg, Birgit Böhm, Hans-Luidger Dienel & Heiner Legewie (2005. Leitfaden für interdisziplinäre Forschergruppen: Projekte initiieren – Zusammenarbeit gestalten [Guidelines for Interdisciplinary Research Teams: Initiating Projects—Developing Cooperation

    Directory of Open Access Journals (Sweden)

    Iris Rittenhofer

    2008-01-01

    Full Text Available Today, project-oriented work is an integral part of academic life. However, not all academics are ready to cope with this organizational aspect of scientific work or with the management of research teams. "Guidelines for Interdisciplinary Research Teams" provides a detailed outline of the various project stages, the potential conflicts and burgeoning power issues, as well as the basics and techniques of moderation. This volume offers excellent insight into the scientific enterprise and provides useful strategic options for managing teamwork. Thus, the volume is suitable for two purposes, namely as a set of guidelines for those inexperienced in scientific cooperation, and as a reference book for those who want to master their previous project experiences and utilize them in future enterprises. However, the intercultural aspect of scientific project organization is not discussed in the volume. URN: urn:nbn:de:0114-fqs0801179

  19. Applying CPR to a gas utility

    International Nuclear Information System (INIS)

    Lowe, R.

    1995-01-01

    The latest management tool to hit the United States over the past five years is Core Process Re-engineering (CPR). Though not as radical a procedure as the well-known rescue method it shares an abbreviation with, it is viewed as the radical thinking of a business process. CPR has helped breathe new life into gas and electric utilities in recent years, which have been using it to find ways to increase customer satisfaction, decrease operating costs, reduce process time and/or increase quality. The first phase of a typical project identifies and reviews current processes and obtains information that can point out re-engineering opportunities. The second phase involves the actual redesign of the current process. In this phase new teams may be formed, since the skill requirements are different (creative thinking becomes very important, for instance). Once alternatives are finalized and approved, the actual change process begins. Implementing all the recommendations can take several years, primarily because of labor and regulatory implications; therefore, planning the implementation is the most important part of the project. First, develop an overall implementation strategy. This overall strategy should address four major questions: What to implement? Who will implement? When to implement? How to implement? CPR is not an automatic solution to a problem. Any company wanting to expedite a CPR effort should consider the following factors: Align the CPR objectives to the overall company objectives; Ensure that senior management is actively involved and supports the CPR activities; Select the right team of people and ensure they are committed to the project; Develop a case for change and instill a sense of urgency in all the stakeholders; Focus on business results and not on specific activities; and Communicate, communicate, communicate

  20. Insight into team competence in medical, nursing and respiratory therapy students.

    Science.gov (United States)

    Sigalet, Elaine L; Donnon, Tyrone L; Grant, Vincent

    2015-01-01

    This study provides information for educators about levels of competence in teams comprised of medical, nursing and respiratory therapy students after receiving a simulation-based team-training (SBT) curriculum with and without an additional formalized 30-min team-training (TT) module. A two-group pre- and post-test research design was used to evaluate team competence with respect to leadership, roles and responsibilities, communication, situation awareness and resource utilization. All scenarios were digitally recorded and evaluated using the KidSIM Team Performance Scale by six experts from medicine, nursing and respiratory therapy. The lowest scores occurred for items that reflected situation awareness. All teams improved their aggregate scores from Time 1 to Time 2 (p performance scores at Time 1 (Cohen's d = 0.92, p performances at Time 1 and 2.

  1. Why good projects fail anyway.

    Science.gov (United States)

    Matta, Nadim F; Ashkenas, Ronald N

    2003-09-01

    Big projects fail at an astonishing rate--more than half the time, by some estimates. It's not hard to understand why. Complicated long-term projects are customarily developed by a series of teams working along parallel tracks. If managers fail to anticipate everything that might fall through the cracks, those tracks will not converge successfully at the end to reach the goal. Take a companywide CRM project. Traditionally, one team might analyze customers, another select the software, a third develop training programs, and so forth. When the project's finally complete, though, it may turn out that the salespeople won't enter in the requisite data because they don't understand why they need to. This very problem has, in fact, derailed many CRM programs at major organizations. There is a way to uncover unanticipated problems while the project is still in development. The key is to inject into the overall plan a series of miniprojects, or "rapid-results initiatives," which each have as their goal a miniature version of the overall goal. In the CRM project, a single team might be charged with increasing the revenues of one sales group in one region by 25% within four months. To reach that goal, team members would have to draw on the work of all the parallel teams. But in just four months, they would discover the salespeople's resistance and probably other unforeseen issues, such as, perhaps, the need to divvy up commissions for joint-selling efforts. The World Bank has used rapid-results initiatives to great effect to keep a sweeping 16-year project on track and deliver visible results years ahead of schedule. In taking an in-depth look at this project, and others, the authors show why this approach is so effective and how the initiatives are managed in conjunction with more traditional project activities.

  2. Team reasoning and collective rationality: piercing the veil of obviousness.

    Science.gov (United States)

    Colman, Andrew M; Pulford, Briony D; Rose, Jo

    2008-06-01

    The experiments reported in our target article provide strong evidence of collective utility maximization, and the findings suggest that team reasoning should now be included among the social value orientations used in cognitive and social psychology. Evidential decision theory offers a possible alternative explanation for our results but fails to predict intuitively compelling strategy choices in simple games with asymmetric team-reasoning outcomes. Although many of our experimental participants evidently used team reasoning, some appear to have ignored the other players' expected strategy choices and used lower-level, nonstrategic forms of reasoning. Standard payoff transformations cannot explain the experimental findings, nor team reasoning in general, without an unrealistic assumption that players invariably reason nonstrategically.

  3. The Role of Project Science in the Chandra X-Ray Observatory

    Science.gov (United States)

    O'Dell, Stephen L.; Weisskopf, Martin C.

    2006-01-01

    The Chandra X-Ray Observatory, one of NASA's Great Observatories, has an outstanding record of scientific and technical success. This success results from the efforts of a team comprising NASA, its contractors, the Smithsonian Astrophysical Observatory, the instrument groups, and other elements of the scientific community, including thousands of scientists who utilize this powerful facility for astrophysical research. We discuss the role of NASA Project Science in the formulation, development, calibration, and operation of the Chandra X-ray Observatory. In addition to representing the scientific community within the Project, Project Science performed what we term "science systems engineering". This activity encompasses translation of science requirements into technical requirements and assessment of the scientific impact of programmatic and technical trades. We briefly describe several examples of science systems engineering conducted by Chandra Project Science.

  4. Better team management--better team care?

    Science.gov (United States)

    Shelley, P; Powney, B

    1994-01-01

    Team building should not be a 'bolt-on' extra, it should be a well planned, integrated part of developing teams and assisting their leaders. When asked to facilitate team building by a group of NHS managers we developed a framework which enabled individual members of staff to become more effective in the way they communicated with each other, their teams and in turn within the organization. Facing the challenge posed by complex organizational changes, staff were able to use 3 training days to increase and develop their awareness of the principles of teamwork, better team management, and how a process of leadership and team building could help yield better patient care.

  5. Team responsibility structure and team performance

    NARCIS (Netherlands)

    Doorewaard, J.A.C.M.; Hootegem, G. van; Huys, R.

    2002-01-01

    The purpose is to analyse the impact of team responsibility (the division of job regulation tasks between team leader and team members) on team performance. It bases an analysis on 36 case studies in The Netherlands which are known to have implemented team‐based work. The case studies were executed

  6. Wahlfach Teamarbeit: Ergebnisse eines Pilotprojektes zur interprofessionellen und interdisziplinären Ausbildung mit formativem Team-OSCE (TOSCE [Teamwork elective: Results of a German pilot project on interprofessional and interdisciplinary education with formative team OSCE

    Directory of Open Access Journals (Sweden)

    Schmidt, Anita

    2010-08-01

    Full Text Available [english] Aims: There is a growing need to implement teamworking in medical education. In reality, interdisciplinary and interprofessional education is often absent. Here we describe a pilot trial developed jointly by the nursing college and the medical faculty in Erlangen (Germany in which nursing students and undergraduate medical students formed interprofessional teams and were confronted with interprofessional cases using simulated patients (SPs and phantoms. The elective was planned using standard curriculum planning instruments and finally evaluated with a novel formative team OSCE (Objective Structured Clinical Evaluation instrument.Methods: During one year, 20 nursing students participated voluntarily in the project and 10 medical students took the course as an elective. Results: The pilot project was first performed with two tutors, one from the medical school and one from the nursing school, as well as one to two SPs. During the second course, there was only one tutor. Overall evaluation of the voluntary students was good, with some elements (acute stroke, factual knowledge, and general organizational problems that needed to be improved. Performance of a four-station team OSCE was feasible, but raters reported problems in assessing individuals and the team at the same time. Interobserver agreement was satisfactory (kappa 0.35.Conclusions: Interdisciplinary and interprofessional education between a nursing school and a medical school is feasible within an elective, but requires substantial personnel resources. Design and performance of a team OSCE is possible. The validity of the test has to be shown on follow-up.[german] Zielsetzung: Das Lernziel „Fähigkeit zur interprofessionellen und interdisziplinären Teamarbeit“ wird sowohl in der aktuellen Approbationsordnung für Ärzte als auch im Krankenpflegegesetz gefordert. In der Realität gibt es in beiden Ausbildungen kaum gemeinsame Lehreinheiten. Wir beschreiben ein Pilotprojekt

  7. SpaceWire Tiger Team Findings and Suggestions

    Science.gov (United States)

    Ishac, Joseph A.

    2011-01-01

    This technical report intends to highlight the key findings and recommendations of the SpaceWire Tiger Team for the CoNNeCT project. It covers findings which are technical in nature, covering design concepts and approaches.

  8. Team cohesion and team success in sport.

    Science.gov (United States)

    Carron, Albert V; Bray, Steven R; Eys, Mark A

    2002-02-01

    The main aim of this study was to examine the relationship between task cohesiveness and team success in elite teams using composite team estimates of cohesion. A secondary aim was to determine statistically the consistency (i.e. 'groupness') present in team members' perceptions of cohesion. Elite university basketball teams (n = 18) and club soccer teams (n = 9) were assessed for cohesiveness and winning percentages. Measures were recorded towards the end of each team's competitive season. Our results indicate that cohesiveness is a shared perception, thereby providing statistical support for the use of composite team scores. Further analyses indicated a strong relationship between cohesion and success (r = 0.55-0.67). Further research using multi-level statistical techniques is recommended.

  9. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  10. Approach to team skills training of nuclear power plant control room crews

    International Nuclear Information System (INIS)

    Davis, L.T.; Gaddy, C.D.; Turney, J.R.

    1985-07-01

    An investigation of current team skills training practices and research was conducted by General Physics Corporation for the Office of Nuclear Reactor Regulation. The methodology used included a review of relevant team skills training literature and a workshop to collect inputs from team training practitioners and researchers from the public and private sectors. The workshop was attended by representatives from nuclear utility training organizations, the commercial airline industry, federal agencies, and defense training and research commands. The literature reviews and workshop results provided the input for a suggested approach to team skills training that can be integrated into existing training programs for control room operating crews. The approach includes five phases: (1) team skills objectives development, (2) basic team skills training, (3) team task training, (4) team skills evaluation, and (5) team training program evaluation. Supporting background information and a user-oriented description of the approach to team skills training are provided. 47 refs

  11. Hybrid compression/absorption type heat utilization system (eco-energy city project)

    Energy Technology Data Exchange (ETDEWEB)

    Karimata, T.; Susami, S.; Ogawa, Y. [Research and Development Dept., EBARA Corp., Kanagawa pref. (Japan)

    1999-07-01

    This research is intended to develop a 'hybrid compression/absorption type heat utilization system' by combining an absorption process with a compression process in one circulation cycle. This system can produce chilling heat for ice thermal storage by utilizing low-temperature waste heat (lower than 100 C) which is impossible to treat with a conventional absorption chiller. It means that this system will be able to solve the problem of a timing mismatch between waste heat and heat demand. The working fluid used in this proposed system should be suitable for producing ice, be safe, and not damage the ozone layer. In this project, new working fluids were searched as substitutes for the existing H{sub 2}O/LiBr or NH{sub 3}/H{sub 2}O. The interim results of this project in 1997, a testing unit using NH{sub 3}/H{sub 2}O was built for demonstration of the system and evaluation of its characteristics, and R134a/E181 was found to be one of the good working fluid for this system. The COP (ratio of energy of ice produced to electric power provided) of this system using R134a/E181 is expected to achieve 5.5 by computer simulation. The testing unit with this working fluid was built recently and prepared for the tests to confirm the result of the simulation. (orig.)

  12. Model project to promote cultivation and utilization of renewable resources. Modellvorhaben zur Foerderung des Anbaus und der Verwertung nachwachsender Rohstoffe

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This revised report on the model projects presents individual projects and measures complementary to each other, documenting, in their totality, an advanced state of development. Moreover it shows the following: that the basic challenge of a model project, especially in the field of the energetic use of biomass, can be met by marrying agriculture to power utilities. So, projects are under way where cultivation of China reed and its utilization in power-and-heat cogeneration plants will, in the future, complement each other. Further questions that are not represented in the research programme of Lower Saxonia are dealt with at the federal level, so that the field of renewable resurces may currently be considered as comprehensively covered. (orig./EF).

  13. Expansion of Michigan EOR Operations Using Advanced Amine Technology at a 600 MW Project Wolverine Carbon Capture and Storage Project

    Energy Technology Data Exchange (ETDEWEB)

    H Hoffman; Y kishinevsky; S. Wu; R. Pardini; E. Tripp; D. Barnes

    2010-06-16

    Wolverine Power Supply Cooperative Inc, a member owned cooperative utility based in Cadillac Michigan, proposes to demonstrate the capture, beneficial utilization and storage of CO{sub 2} in the expansion of existing Enhanced Oil Recovery operations. This project is being proposed in response to the US Department of Energy Solicitation DE-FOA-0000015 Section III D, 'Large Scale Industrial CCS projects from Industrial Sources' Technology Area 1. The project will remove 1,000 metric tons per day of CO{sub 2} from the Wolverine Clean Energy Venture 600 MW CFB power plant owned and operated by WPC. CO{sub 2} from the flue gas will be captured using Hitachi's CO{sub 2} capture system and advanced amine technology. The capture system with the advanced amine-based solvent supplied by Hitachi is expected to significantly reduce the cost and energy requirements of CO{sub 2} capture compared to current technologies. The captured CO{sub 2} will be compressed and transported for Enhanced Oil Recovery and CO{sub 2} storage purposes. Enhanced Oil Recovery is a proven concept, widely used to recover otherwise inaccessible petroleum reserves. While post-combustion CO{sub 2} capture technologies have been tested at the pilot scale on coal power plant flue gas, they have not yet been demonstrated at a commercial scale and integrated with EOR and storage operations. Amine-based CO{sub 2} capture is the leading technology expected to be available commercially within this decade to enable CCS for utility and industrial facilities firing coal and waste fuels such as petroleum coke. However, traditional CO{sub 2} capture process utilizing commercial amine solvents is very energy intensive for regeneration and is also susceptible to solvent degradation by oxygen as well as SOx and NO{sub 2} in the flue gas, resulting in large operating costs. The large volume of combustion flue gas with its low CO{sub 2} concentration requires large equipment sizes, which together with the

  14. Managing complex industrial change through projects

    OpenAIRE

    Perotti , Clément; Minel , Stéphanie; Benoit , Roussel; Jean , Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  15. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    currently partnering with the San Diego Super Computer Center to build the data management infrastructure. Data collected from the three core protocols as well as others are currently made available through the TEAM Network portal, which provides the content management framework, the data scheduling and management framework, an administrative framework to implement and manage TEAM sites, collaborative tools and a number of tools and applications utilizing Google Map and Google Earth products. A critical element of the TEAM Network data management infrastructure is to make the data publicly available in as close to real-time as possible (the TEAM Network Data Use Policy: http://www.teamnetwork.org/en/data/policy). This requires two essential tasks to be accomplished, 1) A data collection schedule has to be planned, proposed and approved for a given TEAM site. This is a challenging process since TEAM sites are geographically distributed across the tropics and hence have different seasons where they schedule field sampling for the different TEAM protocols. Capturing this information and ensuring that TEAM sites follow the outlined legal contract is key to the data collection process and 2) A stream-lined and efficient information management system to ensure data collected from the field meet the minimum data standards (i.e. are of the highest scientific quality) and are securely transferred, archived, processed and be rapidly made publicaly available, as a finished consumable product via the TEAM Network portal. The TEAM Network is achieving these goals by implementing an end-to-end framework consisting of the Sampling Scheduler application and the Data Management Framework. Sampling Scheduler The Sampling Scheduler is a project management, calendar based portal application that will allow scientists at a TEAM site to schedule field sampling for each of the TEAM protocols implemented at that site. The sampling scheduler addresses the specific requirements established in the

  16. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  17. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  18. Team flow - The Magic of Collaboration

    NARCIS (Netherlands)

    M. Makowski; Dr. Paul Breman

    2008-01-01

    This paper is about the conceptual framework of team flow and the action research project at the Hogeschool Utrecht (University of Applied Sciences) which has been launched recently. Have you ever linked the performance of The Rolling Stones - as a long - standing successful music business - to

  19. Scaling Critical Zone analysis tasks from desktop to the cloud utilizing contemporary distributed computing and data management approaches: A case study for project based learning of Cyberinfrastructure concepts

    Science.gov (United States)

    Swetnam, T. L.; Pelletier, J. D.; Merchant, N.; Callahan, N.; Lyons, E.

    2015-12-01

    Earth science is making rapid advances through effective utilization of large-scale data repositories such as aerial LiDAR and access to NSF-funded cyberinfrastructures (e.g. the OpenTopography.org data portal, iPlant Collaborative, and XSEDE). Scaling analysis tasks that are traditionally developed using desktops, laptops or computing clusters to effectively leverage national and regional scale cyberinfrastructure pose unique challenges and barriers to adoption. To address some of these challenges in Fall 2014 an 'Applied Cyberinfrastructure Concepts' a project-based learning course (ISTA 420/520) at the University of Arizona focused on developing scalable models of 'Effective Energy and Mass Transfer' (EEMT, MJ m-2 yr-1) for use by the NSF Critical Zone Observatories (CZO) project. EEMT is a quantitative measure of the flux of available energy to the critical zone, and its computation involves inputs that have broad applicability (e.g. solar insolation). The course comprised of 25 students with varying level of computational skills and with no prior domain background in the geosciences, collaborated with domain experts to develop the scalable workflow. The original workflow relying on open-source QGIS platform on a laptop was scaled to effectively utilize cloud environments (Openstack), UA Campus HPC systems, iRODS, and other XSEDE and OSG resources. The project utilizes public data, e.g. DEMs produced by OpenTopography.org and climate data from Daymet, which are processed using GDAL, GRASS and SAGA and the Makeflow and Work-queue task management software packages. Students were placed into collaborative groups to develop the separate aspects of the project. They were allowed to change teams, alter workflows, and design and develop novel code. The students were able to identify all necessary dependencies, recompile source onto the target execution platforms, and demonstrate a functional workflow, which was further improved upon by one of the group leaders over

  20. There's no team in I: How observers perceive individual creativity in a team setting.

    Science.gov (United States)

    Kay, Min B; Proudfoot, Devon; Larrick, Richard P

    2018-04-01

    Creativity is highly valued in organizations as an important source of innovation. As most creative projects require the efforts of groups of individuals working together, it is important to understand how creativity is perceived for team products, including how observers attribute creative ability to focal actors who worked as part of a creative team. Evidence from three experiments suggests that observers commit the fundamental attribution error-systematically discounting the contribution of the group when assessing the creative ability of a single group representative, particularly when the group itself is not visually salient. In a pilot study, we found that, in the context of the design team at Apple, a target group member visually depicted alone is perceived to have greater personal creative ability than when he is visually depicted with his team. In Study 1, using a sample of managers, we conceptually replicated this finding and further observed that, when shown alone, a target member of a group that produced a creative product is perceived to be as creative as an individual described as working alone on the same output. In Study 2, we replicated the findings of Study 1 and also observed that a target group member depicted alone, rather than with his team, is also attributed less creative ability for uncreative group output. Findings are discussed in light of how overattribution of individual creative ability can harm organizations in the long run. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  1. Improving Care Teams' Functioning: Recommendations from Team Science.

    Science.gov (United States)

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  2. Professional Scrum with Team Foundation Server 2010

    CERN Document Server

    Resnick, Steve; de la Maza, Michael

    2011-01-01

    Professional guidance on using Microsoft’s Visual Studio toolset for agile project management Focusing on both process and results, this professional guide offers a practical approach to running agile software projects using Visual Studio’s project management templates and tools. You’ll first get a thorough overview of the interaction between traditional, scrum-based agile development techniques and the Microsoft Soutions Framework, before drilling down into the detail. The book covers tools, best practices, key templates, key data, team and process models, necessary tracking

  3. The impact of team cognitive styles on performance of radical and incremental NPD projects

    NARCIS (Netherlands)

    de Visser, Matthias; Faems, Dries; Visscher, Klaasjan; de Weerd-Nederhof, Petronella C.

    2014-01-01

    Although prior studies increased our understanding of the performance implications of new product development (NPD) team members’ functional backgrounds and demographic variables, they remained relatively silent on the impact of underlying psychological characteristics such as the team members’

  4. The Impact of Team Cognitive Styles on Performance of Radical and Incremental NPD Projects

    NARCIS (Netherlands)

    de Visser, Matthias; Faems, Dries; Visscher, Klaasjan; de Weerd-Nederhof, Petra

    2014-01-01

    Although prior studies increased our understanding of the performance implications of new product development (NPD) team members' functional backgrounds and demographic variables, they remained relatively silent on the impact of underlying psychological characteristics such as the team members'

  5. Sounds like Team Spirit

    Science.gov (United States)

    Hoffman, Edward

    2002-01-01

    I recently accompanied my son Dan to one of his guitar lessons. As I sat in a separate room, I focused on the music he was playing and the beautiful, robust sound that comes from a well-played guitar. Later that night, I woke up around 3 am. I tend to have my best thoughts at this hour. The trouble is I usually roll over and fall back asleep. This time I was still awake an hour later, so I got up and jotted some notes down in my study. I was thinking about the pure, honest sound of a well-played instrument. From there my mind wandered into the realm of high-performance teams and successful projects. (I know this sounds weird, but this is the sort of thing I think about at 3 am. Maybe you have your own weird thoughts around that time.) Consider a team in relation to music. It seems to me that a crack team can achieve a beautiful, perfect unity in the same way that a band of brilliant musicians can when they're in harmony with one another. With more than a little satisfaction I have to admit, I started to think about the great work performed for you by the Knowledge Sharing team, including this magazine you are reading. Over the past two years I personally have received some of my greatest pleasures as the APPL Director from the Knowledge Sharing activities - the Masters Forums, NASA Center visits, ASK Magazine. The Knowledge Sharing team expresses such passion for their work, just like great musicians convey their passion in the music they play. In the case of Knowledge Sharing, there are many factors that have made this so enjoyable (and hopefully worthwhile for NASA). Three ingredients come to mind -- ingredients that have produced a signature sound. First, through the crazy, passionate playing of Alex Laufer, Michelle Collins, Denise Lee, and Todd Post, I always know that something startling and original is going to come out of their activities. This team has consistently done things that are unique and innovative. For me, best of all is that they are always

  6. The codesign of an interdisciplinary team-based intervention regarding initiating palliative care in pediatric oncology.

    Science.gov (United States)

    Hill, Douglas L; Walter, Jennifer K; Casas, Jessica A; DiDomenico, Concetta; Szymczak, Julia E; Feudtner, Chris

    2018-04-07

    Children with advanced cancer are often not referred to palliative or hospice care before they die or are only referred close to the child's death. The goals of the current project were to learn about pediatric oncology team members' perspectives on palliative care, to collaborate with team members to modify and tailor three separate interdisciplinary team-based interventions regarding initiating palliative care, and to assess the feasibility of this collaborative approach. We used a modified version of experience-based codesign (EBCD) involving members of the pediatric palliative care team and three interdisciplinary pediatric oncology teams (Bone Marrow Transplant, Neuro-Oncology, and Solid Tumor) to review and tailor materials for three team-based interventions. Eleven pediatric oncology team members participated in four codesign sessions to discuss their experiences with initiating palliative care and to review the proposed intervention including patient case studies, techniques for managing uncertainty and negative emotions, role ambiguity, system-level barriers, and team communication and collaboration. The codesign process showed that the participants were strong supporters of palliative care, members of different teams had preferences for different materials that would be appropriate for their teams, and that while participants reported frustration with timing of palliative care, they had difficulty suggesting how to change current practices. The current project demonstrated the feasibility of collaborating with pediatric oncology clinicians to develop interventions about introducing palliative care. The procedures and results of this project will be posted online so that other institutions can use them as a model for developing similar interventions appropriate for their needs.

  7. Flow experience in teams: The role of shared leadership.

    Science.gov (United States)

    Aubé, Caroline; Rousseau, Vincent; Brunelle, Eric

    2018-04-01

    The present study tests a multilevel mediation model concerning the effect of shared leadership on team members' flow experience. Specifically, we investigate the mediating role of teamwork behaviors in the relationships between 2 complementary indicators of shared leadership (i.e., density and centralization) and flow. Based on a multisource approach, we collected data through observation and survey of 111 project teams (521 individuals) made up of university students participating in a project management simulation. The results show that density and centralization have both an additive effect and an interaction effect on teamwork behaviors, such that the relationship between density and teamwork behaviors is stronger when centralization is low. In addition, teamwork behaviors play a mediating role in the relationship between shared leadership and flow. Overall, the findings highlight the importance of promoting team-based shared leadership in organizations to favor the flow experience. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  8. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  9. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  10. The Undergraduate Student Instrument Project (USIP) - building the STEM workforce by providing exciting, multi-disciplinary, student-led suborbital flight projects.

    Science.gov (United States)

    Dingwall, B. J.

    2015-12-01

    NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that

  11. Project selection problem under uncertainty: An application of utility theory and chance constrained programming to a real case

    Directory of Open Access Journals (Sweden)

    Reza Hosnavi Atashgah

    2013-06-01

    Full Text Available Selecting from a pool of interdependent projects under certainty, when faced with resource constraints, has been studied well in the literature of project selection problem. After briefly reviewing and discussing popular modeling approaches for dealing with uncertainty, this paper proposes an approach based on chance constrained programming and utility theory for a certain range of problems and under some practical assumptions. Expected Utility Programming, as the proposed modeling approach, will be compared with other well-known methods and its meaningfulness and usefulness will be illustrated via two numerical examples and one real case.

  12. Making Teamwork Work: Team Knowledge for Team Effectiveness.

    Science.gov (United States)

    Guchait, Priyanko; Lei, Puiwa; Tews, Michael J

    2016-01-01

    This study examined the impact of two types of team knowledge on team effectiveness. The study assessed the impact of taskwork knowledge and teamwork knowledge on team satisfaction and performance. A longitudinal study was conducted with 27 service-management teams involving 178 students in a real-life restaurant setting. Teamwork knowledge was found to impact both team outcomes. Furthermore, team learning behavior was found to mediate the relationships between teamwork knowledge and team outcomes. Educators and managers should therefore ensure these types of knowledge are developed in teams along with learning behavior for maximum effectiveness.

  13. Airborne fallout mapping of 137Cs Finnish defence forces team

    International Nuclear Information System (INIS)

    Kettunen, M.; Heininen, T.; Pulakka, M.

    1997-01-01

    The main task of the team was to create a fallout map of 137 Cs in a specified area in Padasjoki Auttoinen village. The team used an MI-8 helicopter of the Finnish Air Force. The team had an HPGe system (relative efficiency 70%) to measure nuclide specific ground contamination level. For navigation the team took advantage of the DGPS service provided by Finnish Broadcasting company utilizing the RDS-channel to get position accuracy within 2 meters. The correction signal is reachable nationwide on the FM transmitter network. The system produced a distribution map for 40 K and fallout maps for 134,137 Cs using a Micro Station Program with TerraModeler application. The maximum measured 137 Cs ground contamination exceeded 130-140 kBqm -2 . (au)

  14. Project, building and utilization of a tomograph of micro metric resolution to application in soil science

    International Nuclear Information System (INIS)

    Macedo, Alvaro; Torre Neto, Andre; Cruvinel, Paulo Estevao; Crestana, Silvio

    1996-08-01

    This paper describes the project , building and utilization of a tomograph of micro metric resolution in soil science. It describes the problems involved in soil's science study and it describes the system and methodology

  15. Utilizing Lean Six Sigma Methodology to Improve the Authored Works Command Approval Process at Naval Medical Center San Diego.

    Science.gov (United States)

    Valdez, Michelle M; Liwanag, Maureen; Mount, Charles; Rodriguez, Rechell; Avalos-Reyes, Elisea; Smith, Andrew; Collette, David; Starsiak, Michael; Green, Richard

    2018-03-14

    Inefficiencies in the command approval process for publications and/or presentations negatively impact DoD Graduate Medical Education (GME) residency programs' ability to meet ACGME scholarly activity requirements. A preliminary review of the authored works approval process at Naval Medical Center San Diego (NMCSD) disclosed significant inefficiency, variation in process, and a low level of customer satisfaction. In order to facilitate and encourage scholarly activity at NMCSD, and meet ACGME requirements, the Executive Steering Council (ESC) chartered an interprofessional team to lead a Lean Six Sigma (LSS) Rapid Improvement Event (RIE) project. Two major outcome metrics were identified: (1) the number of authored works submissions containing all required signatures and (2) customer satisfaction with the authored works process. Primary metric baseline data were gathered utilizing a Clinical Investigations database tracking publications and presentations. Secondary metric baseline data were collected via a customer satisfaction survey to GME faculty and residents. The project team analyzed pre-survey data and utilized LSS tools and methodology including a "gemba" (environment) walk, cause and effect diagram, critical to quality tree, voice of the customer, "muda" (waste) chart, and a pre- and post-event value stream map. The team selected an electronic submission system as the intervention most likely to positively impact the RIE project outcome measures. The number of authored works compliant with all required signatures improved from 52% to 100%. Customer satisfaction rated as "completely or mostly satisfied" improved from 24% to 97%. For both outcomes, signature compliance and customer satisfaction, statistical significance was achieved with a p methodology and tools to improve signature compliance and increase customer satisfaction with the authored works approval process, leading to 100% signature compliance, a comprehensive longitudinal repository of all

  16. Primary care team communication networks, team climate, quality of care, and medical costs for patients with diabetes: A cross-sectional study.

    Science.gov (United States)

    Mundt, Marlon P; Agneessens, Filip; Tuan, Wen-Jan; Zakletskaia, Larissa I; Kamnetz, Sandra A; Gilchrist, Valerie J

    2016-06-01

    Primary care teams play an important role in providing the best quality of care to patients with diabetes. Little evidence is available on how team communication networks and team climate contribute to high quality diabetes care. To determine whether primary care team communication and team climate are associated with health outcomes, health care utilization, and associated costs for patients with diabetes. A cross-sectional survey of primary care team members collected information on frequency of communication with other care team members about patient care and on team climate. Patient outcomes (glycemic, cholesterol, and blood pressure control, urgent care visits, emergency department visits, hospital visit days, medical costs) in the past 12 months for team diabetes patient panels were extracted from the electronic health record. The data were analyzed using nested (clinic/team/patient) generalized linear mixed modeling. 155 health professionals at 6 U.S. primary care clinics participated from May through December 2013. Primary care teams with a greater number of daily face-to-face communication ties among team members were associated with 52% (rate ratio=0.48, 95% CI: 0.22, 0.94) fewer hospital days and US$1220 (95% CI: -US$2416, -US$24) lower health-care costs per team diabetes patient in the past 12 months. In contrast, for each additional registered nurse (RN) who reported frequent daily face-to-face communication about patient care with the primary care practitioner (PCP), team diabetes patients had less-controlled HbA1c (Odds ratio=0.83, 95% CI: 0.66, 0.99), increased hospital days (RR=1.57, 95% CI: 1.10, 2.03), and higher healthcare costs (β=US$877, 95% CI: US$42, US$1713). Shared team vision, a measure of team climate, significantly mediated the relationship between team communication and patient outcomes. Primary care teams which relied on frequent daily face-to-face communication among more team members, and had a single RN communicating patient care

  17. Primary care team communication networks, team climate, quality of care, and medical costs for patients with diabetes: A cross-sectional study

    Science.gov (United States)

    Mundt, Marlon P.; Agneessens, Filip; Tuan, Wen-Jan; Zakletskaia, Larissa I.; Kamnetz, Sandra A.; Gilchrist, Valerie J.

    2016-01-01

    Background Primary care teams play an important role in providing the best quality of care to patients with diabetes. Little evidence is available on how team communication networks and team climate contribute to high quality diabetes care. Objective To determine whether primary care team communication and team climate are associated with health outcomes, health care utilization, and associated costs for patients with diabetes. Methods A cross-sectional survey of primary care team members collected information on frequency of communication with other care team members about patient care and on team climate. Patient outcomes (glycemic, cholesterol, and blood pressure control, urgent care visits, emergency department visits, hospital visit days, medical costs) in the past 12 months for team diabetes patient panels were extracted from the electronic health record. The data were analyzed using nested (clinic/team/patient) generalized linear mixed modeling. Participants 155 health professionals at 6 U.S. primary care clinics participated from May through December 2013. Results Primary care teams with a greater number of daily face-to-face communication ties among team members were associated with 52% (Rate Ratio=0.48, 95% CI: 0.22, 0.94) fewer hospital days and US$1220 (95% CI: -US$2416, -US$24) lower health-care costs per team diabetes patient in the past 12 months. In contrast, for each additional registered nurse (RN) who reported frequent daily face-to-face communication about patient care with the primary care practitioner (PCP), team diabetes patients had less-controlled HbA1c (Odds Ratio=0.83, 95% CI: 0.66, 0.99), increased hospital days (RR=1.57, 95% CI: 1.10, 2.03), and higher healthcare costs (β=US$877, 95% CI: US$42, US$1713). Shared team vision, a measure of team climate, significantly mediated the relationship between team communication and patient outcomes. Conclusions Primary care teams which relied on frequent daily face-to-face communication among more

  18. Virtual Teams and E-Collaboration Technology: A Case Study Investigating the Dynamics of Virtual Team Communication

    Science.gov (United States)

    Mattison, Theresa

    2011-01-01

    The purpose of this study was to determine to what extent the use of e-collaboration tools when used as a primary channel of communication affected virtual team members' trust and motivation, in a spatially dispersed environment. Structured interviews were conducted with 18 project managers, who were responsible for leading virtual projects…

  19. Communication skills to develop trusting relationships on global virtual engineering capstone teams

    Science.gov (United States)

    Zaugg, Holt; Davies, Randall S.

    2013-05-01

    As universities seek to provide cost-effective, cross-cultural experiences using global virtual (GV) teams, the 'soft' communication skills typical of all teams, increases in importance for GV teams. Students need to be taught how to navigate through cultural issues and virtual tool issues to build strong trusting relationships with distant team members. Weekly team meetings provide an excellent opportunity to observe key team interactions that facilitate relationship and trust-building among team members. This study observed the weekly team meetings of engineering students attending two US universities and one Asian university as they collaborated as a single GV capstone GV team. In addition local team members were interviewed individually and collectively throughout the project to determine strategies that facilitated team relations and trust. Findings indicate the importance of student choice of virtual communication tools, the refining of communication practices, and specific actions to build trusting relationships. As student developed these attributes, collaboration and success was experienced on this GV team.

  20. Systematic evaluation of nuclear operator team skills training

    International Nuclear Information System (INIS)

    Harrington, D.K.; Kello, J.E.

    1991-01-01

    In recent years, the nuclear industry has increasingly recognized with the technical training given its control room operators. As yet, however, little has been done to determine the actual effectiveness of such nontechnical training. Thus, the questions of how team training should be carried out for maximum impact on the safety and efficiency of control room operation and just what the benefits of such training might be remain open. We are in the early stages of establishing a systematic evaluation process that will help nuclear utilities assess the effectiveness of their existing team skills training programs for control room operators. Research focuses on defining the specific behavioral and attitudinal objectives of team skills training. Simply put, what does good practice look like and sound like in the control room environment? What specific behaviors and attitudes should the training be directed toward? Obviously, the answers to the questions have clear implications for the design of nuclear team skills training programs

  1. 78 FR 70076 - Large Scale Networking (LSN)-Middleware and Grid Interagency Coordination (MAGIC) Team

    Science.gov (United States)

    2013-11-22

    ... projects. The MAGIC Team reports to the Large Scale Networking (LSN) Coordinating Group (CG). Public... Coordination (MAGIC) Team AGENCY: The Networking and Information Technology Research and Development (NITRD... MAGIC Team meetings are held on the first Wednesday of each month, 2:00-4:00 p.m., at the National...

  2. Multivariate Analysis of Students Perception on Teaching with Client Based and Non-Client Based Team Projects

    Directory of Open Access Journals (Sweden)

    Philip Appiah-Kubi

    2018-05-01

    Full Text Available The classroom experience has evolved from traditional lecture, PowerPoint and whiteboards to a more active environment where students and instructors work together more on hands-on activities to achieve the course objectives. Various names have been given to this pedagogy; experiential learning, project-based learning, active learning, problem-based learning are a handful of names used to describe this evolving pedagogy. The main challenge faced by educators in educating undergraduate students to be independent thinkers and problem solvers, has been the driving force fueling the shift in pedagogy. The skill sets needed to be successful in the workforce has also evolved over the years. Today’s employees are not only expected to demonstrate proficiency in green skills in their field of study, but must also possess soft skills required to be competitive in the industry. Gone are the days where engineers worked in silos applying their green skills to create for the common good. To be productive, employers expect today’s engineer to demonstrate the ability to work in teams, communicate effectively, while applying the technical and analytical know-how needed to achieve a desired goal. To ensure that undergraduate students have these desired skills, most engineering educators have shifted away from the traditional all lecture classes and are applying active learning pedagogies. This research looks into student’s perception on project-based learning with client based and non-client based projects in terms of: the project as a learning device, contribution to research knowledge, motivation to learn, contribution to skills and personal benefits, and their effects on student evaluation of teaching and motivation to learn.

  3. Integrated Simulation Development and Decision Support Tool-Set for Utility Market and Distributed Solar Power Generation Electricore, Inc.

    Energy Technology Data Exchange (ETDEWEB)

    Daye, Tony [Green Power Labs (GPL), San Diego, CA (United States)

    2013-09-30

    This project will enable utilities to develop long-term strategic plans that integrate high levels of renewable energy generation, and to better plan power system operations under high renewable penetration. The program developed forecast data streams for decision support and effective integration of centralized and distributed solar power generation in utility operations. This toolset focused on real time simulation of distributed power generation within utility grids with the emphasis on potential applications in day ahead (market) and real time (reliability) utility operations. The project team developed and demonstrated methodologies for quantifying the impact of distributed solar generation on core utility operations, identified protocols for internal data communication requirements, and worked with utility personnel to adapt the new distributed generation (DG) forecasts seamlessly within existing Load and Generation procedures through a sophisticated DMS. This project supported the objectives of the SunShot Initiative and SUNRISE by enabling core utility operations to enhance their simulation capability to analyze and prepare for the impacts of high penetrations of solar on the power grid. The impact of high penetration solar PV on utility operations is not only limited to control centers, but across many core operations. Benefits of an enhanced DMS using state-of-the-art solar forecast data were demonstrated within this project and have had an immediate direct operational cost savings for Energy Marketing for Day Ahead generation commitments, Real Time Operations, Load Forecasting (at an aggregate system level for Day Ahead), Demand Response, Long term Planning (asset management), Distribution Operations, and core ancillary services as required for balancing and reliability. This provided power system operators with the necessary tools and processes to operate the grid in a reliable manner under high renewable penetration.

  4. An Examination of Leadership Types among Generation Y and Its Impact on Virtual Team Effectiveness

    Science.gov (United States)

    Graham, C. Matt

    2013-01-01

    The majority of database system development projects end in failure. Reasons that include, the system not being developed on time, the system was developed over budget, and the system developed did not meet the planned project's criteria. These failures are compounded by the use of virtual teams which includes problems with team formation, the…

  5. Paradoxes in virtual team knowledge communication and trust building

    DEFF Research Database (Denmark)

    Petersen, Nils Braad

    2012-01-01

    This thesis proposal presents paradoxes within current trust and knowledge management literatures as a lens for understanding challenges in virtual teams working across organisational and geographic boundaries. By exposing contradictions within current virtual team research, the author proposes...... a need for a different, multi-level, multi-theoretical approach to virtual team research in order to overcome the paradoxes. A moderate constructionist research position building on Critical Realism is proposed. To situate the project within current literatures, trust, knowledge management and virtual...... team literatures are reviewed. These are used to support the paradoxes used as a lens for understanding. A research design is presented building on interviews, documentary analysis and observations analysed using Social Network Analysis and James Gee’s framework for discourse analysis. Finally...

  6. Enhancing the Teaching of Introductory Economics with a Team-Based, Multi-Section Competition

    Science.gov (United States)

    Beaudin, Laura; Berdiev, Aziz N.; Kaminaga, Allison Shwachman; Mirmirani, Sam; Tebaldi, Edinaldo

    2017-01-01

    The authors describe a unique approach to enhancing student learning at the introductory economics level that utilizes a multi-section, team-based competition. The competition is structured to supplement learning throughout the entire introductory course. Student teams are presented with current economic issues, trends, or events, and use economic…

  7. Distant yet Near: Promoting Interdisciplinary Learning in Significantly Diverse Teams through Socially Responsible Projects

    Science.gov (United States)

    Adya, Monica; Temple, Bryan K.; Hepburn, Donald M.

    2015-01-01

    With global specialization of work units within organizations, interdisciplinary work practices comprised of collaborative efforts between technical and business teams are increasingly common in today's workplace. While higher education has responded by creating opportunities for remote teams to learn from collaborative work, occasions for…

  8. Using EPA Tools and Data Services to Inform Changes to Design Storm Definitions for Wastewater Utilities based on Climate Model Projections

    Science.gov (United States)

    Tryby, M.; Fries, J. S.; Baranowski, C.

    2014-12-01

    Extreme precipitation events can cause significant impacts to drinking water and wastewater utilities, including facility damage, water quality impacts, service interruptions and potential risks to human health and the environment due to localized flooding and combined sewer overflows (CSOs). These impacts will become more pronounced with the projected increases in frequency and intensity of extreme precipitation events due to climate change. To model the impacts of extreme precipitation events, wastewater utilities often develop Intensity, Duration, and Frequency (IDF) rainfall curves and "design storms" for use in the U.S. Environmental Protection Agency's (EPA) Storm Water Management Model (SWMM). Wastewater utilities use SWMM for planning, analysis, and facility design related to stormwater runoff, combined and sanitary sewers, and other drainage systems in urban and non-urban areas. SWMM tracks (1) the quantity and quality of runoff made within each sub-catchment; and (2) the flow rate, flow depth, and quality of water in each pipe and channel during a simulation period made up of multiple time steps. In its current format, EPA SWMM does not consider climate change projection data. Climate change may affect the relationship between intensity, duration, and frequency described by past rainfall events. Therefore, EPA is integrating climate projection data available in the Climate Resilience Evaluation and Awareness Tool (CREAT) into SWMM. CREAT is a climate risk assessment tool for utilities that provides downscaled climate change projection data for changes in the amount of rainfall in a 24-hour period for various extreme precipitation events (e.g., from 5-year to 100-year storm events). Incorporating climate change projections into SWMM will provide wastewater utilities with more comprehensive data they can use in planning for future storm events, thereby reducing the impacts to the utility and customers served from flooding and stormwater issues.

  9. Incorporating Solid Modeling and Team-Based Design into Freshman Engineering Graphics.

    Science.gov (United States)

    Buchal, Ralph O.

    2001-01-01

    Describes the integration of these topics through a major team-based design and computer aided design (CAD) modeling project in freshman engineering graphics at the University of Western Ontario. Involves n=250 students working in teams of four to design and document an original Lego toy. Includes 12 references. (Author/YDS)

  10. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    International Nuclear Information System (INIS)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-01-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL's Program is utilizing nearly all areas in PMI's Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?'' and ''How are you approaching similar challenges?'' will be questions for a dialog with the audience

  11. Utilization of the simulators in I and C renewal project of Loviisa NPP

    International Nuclear Information System (INIS)

    Porkholm, K.; Ahonen, A.; Tiihonen, O.

    2006-01-01

    There are two VVER-440 type reactors in Loviisa Nuclear Power Plant. The first unit has been in operation since 1977 and the second since 1980. The availability of the plant as well as the operational experiences of the I and C systems are good. However it is obvious that the lifetime of the original I and C systems is not sufficient to guarantee the good availability of the plant in the future. Due to this fact a project for the renewal of the existing I and C systems has been started at Loviisa Nuclear Power Plant. In the project the analogue I and C systems will be renewed by digital I and C systems in four phases during 2005...2014. Simulators will be utilized extensively in the project to assure that the renewal of I and C systems can be realized safely and economically. An engineering simulator will be used in the design and validation of the modifications of the renewal I and C systems. A development simulator is aimed for the design, testing and acceptance of the new Man Machine Interface. A testing simulator will be used for the testing of the new I and C systems and retuning of the controllers mainly during the Factory Acceptance Tests. A training simulator will be used in training the operators and the other technical personnel in the operation of the new monitor-based control room facilities. All the simulators in the renewal project are based on APROS (Advanced PROcess Simulator) Simulation Software. Fortum Nuclear Services Ltd and the Technical Research Centre of Finland have developed APROS Simulation Software since 1986. APROS is a good example of the real multifunctional simulation software; i.e. it can be used in process and automation design, safety analysis and training simulator applications. APROS has been used extensively for various analysis and simulation tasks of the Loviisa Nuclear Power Plant in the past years. It has also been applied to various nuclear and thermal power plants elsewhere. First a short overview of Loviisa Nuclear Power

  12. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  13. 77 FR 58416 - Large Scale Networking (LSN); Middleware and Grid Interagency Coordination (MAGIC) Team

    Science.gov (United States)

    2012-09-20

    ..., Grid, and cloud projects. The MAGIC Team reports to the Large Scale Networking (LSN) Coordinating Group... Coordination (MAGIC) Team AGENCY: The Networking and Information Technology Research and Development (NITRD.... Dates/Location: The MAGIC Team meetings are held on the first Wednesday of each month, 2:00-4:00pm, at...

  14. Renewable Resources: a national catalog of model projects. Volume 4. Western Solar Utilization Network Region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    This compilation of diverse conservation and renewable energy projects across the United States was prepared through the enthusiastic participation of solar and alternate energy groups from every state and region. Compiled and edited by the Center for Renewable Resources, these projects reflect many levels of innovation and technical expertise. In many cases, a critique analysis is presented of how projects performed and of the institutional conditions associated with their success or failure. Some 2000 projects are included in this compilation; most have worked, some have not. Information about all is presented to aid learning from these experiences. The four volumes in this set are arranged in state sections by geographic region, coinciding with the four Regional Solar Energy Centers. The table of contents is organized by project category so that maximum cross-referencing may be obtained. This volume includes information on the Western Solar Utilization Network Region. (WHK)

  15. [The mobile geriatrics team, global patient management].

    Science.gov (United States)

    Bach, Fréderiue; Bloch, Frédéric

    2013-01-01

    The mobile geriatric team of Cochin hospital in Paris is responsible for the management and orientation of fragile elderly patients over the age of 75 admitted to emergency departments. It carries out a multi-disciplinary assessment, contributes to the creation of the care project and life project of geriatric patients and is involved in organising the patient's return home. This article focuses on the role of the social assistant through two clinical cases.

  16. Utilizing social media for informal ocean conservation and education: The BioOceanography Project

    Science.gov (United States)

    Payette, J.

    2016-02-01

    Science communication through the use of social media is a rapidly evolving and growing pursuit in academic and scientific circles. Online tools and social media are being used in not only scientific communication but also scientific publication, education, and outreach. Standards and usage of social media as well as other online tools for communication, networking, outreach, and publication are always in development. Caution and a conservative attitude towards these novel "Science 2.0" tools is understandable because of their rapidly changing nature and the lack of professional standards for using them. However there are some key benefits and unique ways social media, online systems, and other Open or Open Source technologies, software, and "Science 2.0" tools can be utilized for academic purposes such as education and outreach. Diverse efforts for ocean conservation and education will continue to utilize social media for a variety of purposes. The BioOceanography project is an informal communication, education, outreach, and conservation initiative created for enhancing knowledge related to Oceanography and Marine Science with an unbiased yet conservation-minded approach and in an Open Source format. The BioOceanography project is ongoing and still evolving, but has already contributed to ocean education and conservation communication in key ways through a concerted web presence since 2013, including a curated Twitter account @_Oceanography and BioOceanography blog style website. Social media tools like those used in this project, if used properly can be highly effective and valuable for encouraging students, networking with researchers, and educating the general public in Oceanography.

  17. Organization of the ITER Co-ordinated Technical Activities International Team

    International Nuclear Information System (INIS)

    2001-01-01

    At its meeting in Toronto on 7 November 2001, the ITER Co-ordinated Technical Activities (CTA) project board took note of the organizational arrangements for the CTA International Team at the Garching and Naka joint work sites. The organization chart of the team remains almost unchanged from that of the ITER Engineering Design Activities (EDA). However, there is no special division responsible for plasma and field control. Activities in plasma control will be taken over by the Physics Unit. This newsletter also includes the ITER CTA International Team structure

  18. Validation of Early Detection Ovarian Cancer Biomarkers (Team Project) — EDRN Public Portal

    Science.gov (United States)

    Early detection of Ovarian Cancer (OC) is one of the key clinical problems in this disease. We propose a team EDRN project to address the issue of early detection of OC by performing a validation study on candidate protein markers already identified in previous EDRN research or in the literature (e.g. protein products of TCGA identified mutations specific to ovarian cancer). (See appendix for full listing) Biospecimen sources have been identified which include samples obtained at diagnosis and matched controls (Urban, Godwin, Marks, Skates), and longitudinal samples obtained prior to diagnosis (Urban, Skates, Godwin). Bioinformatic filters will be applied to rank the candidates (Diamandis). In order of ranking, candidate proteins for which high quality antibodies are available will be measured by development of ELISAs at JHU (Chan/Zhang) or through NAPPA at DFCI (Anderson/LaBaer), while for other candidates mass spectrometry based selective reaction monitoring (SRM) assays will be developed at PNNL (Rodland). Three milestones are defined. The first two milestones are to assemble the necessary specimens and to develop the qualifying assay(s). The final milestone is to estimate the markers’ sensitivity one year prior to diagnosis at a given high specificity.

  19. Using Action Research to Teach Students to Manage Team Learning and Improve Teamwork Satisfaction

    Science.gov (United States)

    Scott-Ladd, Brenda; Chan, Christopher C. A.

    2008-01-01

    This article reports on a study investigating strategies that students can use to develop skills in managing team learning. Two groups of second-year management students participated in a semester-long action research project over two semesters. The students were educated on team development, team processes and conflict management and how to…

  20. Reducing Teenage Binge Drinking and Drunk Driving on the Reservation: The Pikanii Action Team

    Science.gov (United States)

    Still Smoking, Dorothy; Bull Shoe, Debbie Whitegrass

    2012-01-01

    The Pikanii Action Team project addressed the issues of teenage drinking and drunk driving on the Blackfeet Reservation. Basing their actions on locally-generated research, the Pikanii Action Team conducted a series of activities and initiatives to promote public awareness and action related to high-risk activities related to drinking. The team's…

  1. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [Department of Energy, Office of River Protection, Richland, Washington (United States); Kacich, Richard M. [Bechtel National, Inc., Richland, WA (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Richland, WA (United States)

    2012-12-20

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  2. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2012-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  3. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  4. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [U.S. Department of Energy, Office of River Protection, Post Office Box 550, Richland, Washington 99352 (United States); Kacich, Richard M. [Bechtel National, Inc., 2435 Stevens Center Place, Richland, Washington 99354 (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Post Office Box 850, Richland, Washington 99352 (United States)

    2013-07-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines

  5. Teams make it work: how team work engagement mediates between social resources and performance in teams.

    Science.gov (United States)

    Torrente, Pedro; Salanova, Marisa; Llorens, Susana; Schaufeli, Wilmar B

    2012-02-01

    In this study we analyze the mediating role of team work engagement between team social resources (i.e., supportive team climate, coordination, teamwork), and team performance (i.e., in-role and extra-role performance) as predicted by the Job Demands-Resources Model. Aggregated data of 533 employees nested within 62 teams and 13 organizations were used, whereas team performance was assessed by supervisor ratings. Structural equation modeling revealed that, as expected, team work engagement plays a mediating role between social resources perceived at the team level and team performance as assessed by the supervisor.

  6. Cross-Cultural Management Learning through Innovative Pedagogy: An Exploratory Study of Globally Distributed Student Teams

    Science.gov (United States)

    Bartel-Radic, Anne; Moos, J. Chris; Long, Suzanna K.

    2015-01-01

    This article presents an innovative pedagogy based on student participation in globally distributed project teams. The study questions the link between student learning of intercultural competence and the global teaming experience. Data was collected from 115 students participating in 22 virtual intercultural teams. Results revealed that students…

  7. Utility industry evaluation of the metal fuel facility and metal fuel performance for liquid metal reactors

    International Nuclear Information System (INIS)

    Burstein, S.; Gibbons, J.P.; High, M.D.; O'Boyle, D.R.; Pickens, T.A.; Pilmer, D.F.; Tomonto, J.R.; Weinberg, C.J.

    1990-02-01

    A team of utility industry representatives evaluated the liquid metal reactor metal fuel process and facility conceptual design being developed by Argonne National Laboratory (ANL) under Department of Energy sponsorship. The utility team concluded that a highly competent ANL team was making impressive progress in developing high performance advanced metal fuel and an economic processing and fabrication technology. The utility team concluded that the potential benefits of advanced metal fuel justified the development program, but that, at this early stage, there are considerable uncertainties in predicting the net overall economic benefit of metal fuel. Specific comments and recommendations are provided as a contribution towards enhancing the development program. 6 refs

  8. Team Learning Beliefs and Behaviours in Response Teams

    Science.gov (United States)

    Boon, Anne; Raes, Elisabeth; Kyndt, Eva; Dochy, Filip

    2013-01-01

    Purpose: Teams, teamwork and team learning have been the subject of many research studies over the last decades. This article aims at investigating and confirming the Team Learning Beliefs and Behaviours (TLB&B) model within a very specific population, i.e. police and firemen teams. Within this context, the paper asks whether the team's…

  9. Personality and community prevention teams: Dimensions of team leader and member personality predicting team functioning.

    Science.gov (United States)

    Feinberg, Mark E; Kim, Ji-Yeon; Greenberg, Mark T

    2008-11-01

    The predictors and correlates of positive functioning among community prevention teams have been examined in a number of research studies; however, the role of personality has been neglected. In this study, we examined whether team member and leader personality dimensions assessed at the time of team formation predicted local prevention team functioning 2.5-3.5 years later. Participants were 159 prevention team members in 14 communities participating in the PROSPER study of prevention program dissemination. Three aspects of personality, aggregated at the team level, were examined as predictors: Openness to Experience, Conscientiousness, and Agreeableness. A series of multivariate regression analyses were performed that accounted for the interdependency of five categories of team functioning. Results showed that average team member Openness was negatively, and Conscientiousness was positively linked to team functioning. The findings have implications for decisions about the level and nature of technical assistance support provided to community prevention teams.

  10. Managing Complex Distance Education Projects in a Telework Environment

    Science.gov (United States)

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  11. Coping with Challenge and Hindrance Stressors in Teams: Behavioral, Cognitive, and Affective Outcomes

    Science.gov (United States)

    Pearsall, Matthew J.; Ellis, Aleksander P. J.; Stein, Jordan H.

    2009-01-01

    The purpose of this study was to utilize the challenge-hindrance framework to examine the discrete and combined effects of different environmental stressors on behavioral, cognitive, and affective outcomes at the team level. Results from 83 teams working on a command and control simulation indicated that the introduction of a challenge stressor…

  12. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate

  13. A Framework for Understanding Collective Leadership: The Selective Utilization of Leader and Team Expertise within Networks

    Science.gov (United States)

    2011-05-01

    characteristics (e.g., team stability, autonomy , enabling interactions) that will 22    influence collective leadership and performance. Taken...composition, the team’s autonomy , role integration, and preparation for team activities (Mumford & Hunter, 2005; Spreitzer, Cohen & Ledford, 1999; Uhl...tasks as interdependent was influenced by their belief in the value of teamwork, self-efficacy for teamwork, and collectivist feelings. Thus, the way

  14. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  15. Incorporating Virtually Immersive Environments as a Collaborative Medium for Virtual Teaming

    Directory of Open Access Journals (Sweden)

    Charles J. Lesko, Jr.

    2012-08-01

    Full Text Available Virtually immersive environments incorporate the use of various computer modelling and simulation techniques enabling geographically dispersed virtual project teams to interact within an artificially projected three-dimensional space online. This study focused on adoption of virtually immersive technologies as a collaborative media to support virtual teaming of both graduate and undergraduate-level project management students. The data and information from this study has implications for educators using virtually immersive environments in the classroom. In this study, we specifically evaluated two key components in this paper: 1 students’ level of trust and; 2 students’ willingness to use the technology, along with their belief about the virtual environment’s ability to extend and improve knowledge sharing in their team work environment. We learned that while students did find the environment a positive add on for working collaboratively, there were students who were neither more nor less likely to use the technology for future collaborative ventures. Most of the students who were not very positive about the environment were “fence sitters” likely indicating needs related to additional training to improve communication skills. Finally, based on the full study results we have provided basic recommendations designed to support team trust building in the system along with interpersonal trust building to facilitate knowledge transfer and better strategic us of the technology.

  16. Canadian contribution to the European Union Home Team program for ITER

    International Nuclear Information System (INIS)

    Murdoch, D.K.; Blevins, J.D.; Gierszewski, P.; Matsugu, R.

    1998-01-01

    Canadian participation in R and D and design tasks for the ITER project is predominantly in the fuel cycle, remote handling and safety fields. These tasks are carried out in Canada by Ontario Hydro, research institutes, industry and universities. In addition, Canada provides the services of a number of specialist engineers and scientists in key positions at the three ITER work sites and in the European Home Team. The Canadian contribution, which is coordinated by the Canadian Fusion Fuels Technology Project (CFFTP), forms an integral part of the European Union Home Team program. The key components of the Canadian contribution are described. (author)

  17. Research team training: moving beyond job descriptions.

    Science.gov (United States)

    Nelson, LaRon E; Morrison-Beedy, Dianne

    2008-08-01

    Providing appropriate training to research team members is essential to the effective implementation and overall operation of a research project. It is important to identify job requirements beyond those listed in the job description in order to fully assess basic and supplementary training needs. Training needs should be identified prior to and during the conduct of the study. Methods for delivering the training must also be identified. This article describes the identification of training needs and methods in the design of a research team training program using examples from an HIV prevention intervention trial with adolescent girls.

  18. Critical Success Factors of Mobile Application Development Projects: A Qualitative Study

    Directory of Open Access Journals (Sweden)

    Hamza Khastar

    2016-07-01

    Full Text Available This study seeks to identify the critical success factors of teams in the application-development project. To achieve this goal, a qualitative approach and content analysis was utilized. Semi-structured interviews with 14 developers and experts was performed for data collection. A systematic review of previous research shows that after 9 critical success factors. With the analysis interviews, the CSf's raised to 12; including user experience, strategy and project management, support and promotion, business models, planning and goal setting, financial and budgeting, marketing and customer needs, infrastructure, technical issues and design, contextual factors, teamwork and staffing. The results show that the customer experience, teamwork and contextual factors are core categories in the research paradigm model.

  19. Youth, Team sports and Citizenship

    DEFF Research Database (Denmark)

    Ryom, Knud; Stelter, Reinhard

    of a team sports project as well as coaching and mentoring, the project goal was to challenge the boys to be part of a new shared and empowering community, so that they actively experienced the ability to take responsibility for themselves and others in the arenas where they lived. In close co......-operation with the local sports club ’Nørrebro United’, 26 volunteer coaches (coaching the boys in school), school staff, the local community and not least the young people themselves, the intervention gradually took it’s own form. The intention of this strong local co-operation, was to clarify the young participants...... bullet points. We will use voices from the project, like volunteer coaches and the local sports club Nørrebro United. This final discussion will broaden the local agenda of this research project towards a more general discussion with the participants....

  20. Global Engineering Teams--A Programme Promoting Teamwork in Engineering Design and Manufacturing

    Science.gov (United States)

    Oladiran, M. T.; Uziak, J.; Eisenberg, M.; Scheffer, C.

    2011-01-01

    Engineering graduates are expected to possess various competencies categorised into hard and soft skills. The hard skills are acquired through specific coursework, but the soft skills are often treated perfunctorily. Global Engineering Teams (GET) is a programme that promotes project-oriented tasks in virtual student teams working in collaboration…