Sample records for projects require independent

  1. Recent experiences with independent power projects

    International Nuclear Information System (INIS)

    Kline, R.H.; Fitzowitch, J.R.; Dalla-Longa, L.

    1999-01-01

    New opportunities are making it possible to develop independent power projects involving partnerships with the electric power industry, and the petroleum and natural gas industry . This paper described those opportunities, the impediments and the risks involved. Mercury Electric Corp. has been involved in power projects at remote gas field and oil field sites where they use of a turbogenerator which runs on flare gas to generate electricity. TransCanada Power's involvement in independent power projects includes the supply and transport of gas and their ability to provide gas fired combined cycle technology. They are involved in a project at Hermiston, Oregon and also in a cogeneration project in Medicine Hat, Alberta. The CanCarb City of Medicine Hat project makes use of waste heat at an industrial facility. 11 figs

  2. The Independence Pipeline project : ANR's supply link - Independence Pipeline, Transco's market link

    International Nuclear Information System (INIS)

    Persells, T.

    1998-01-01

    An overview of the Independence Pipeline project was presented. The project offers access from Chicago to the U.S. Midwest market, as well as to Ontario via MichCon, Consumers Power, Great Lakes and Panhandle. The project has three components: ANR's Supply Link, the Independence Pipeline and Transco's MarketLink. The three components are budgeted at $ 1.332 billion dollars and projected for completion between Nov 1999 and Nov 2000. Each component (services, access advantages, market links, rates, storage services, etc ) are described separately. figs

  3. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  4. On the k-independence required by linear probing and minwise independence

    DEFF Research Database (Denmark)

    Pǎtraşcu, Mihai; Thorup, Mikkel

    2016-01-01

    We show that linear probing requires 5-independent hash functions for expected constant-time performance, matching an upper bound of Pagh et al. [2009]. More precisely, we construct a random 4-independent hash function yielding expected logarithmic search time for certain keys. For (1 + ε......)-approximate minwise independence, we show that Ω(lg1 ε)-independent hash functions are required, matching an upper bound of Indyk [2001]. We also show that the very fast 2-independent multiply-shift scheme of Dietzfelbinger [1996] fails badly in both applications....

  5. Gas supply for independent power projects: Drilling programs and reserve acquisitions

    International Nuclear Information System (INIS)

    Lambert, J.D.; Walker, R.K.

    1990-01-01

    Developers of gas-fired independent power projects, although drawn to gas as the fuel of choice for economic and environmental reasons, are finding the problem of cost-effective gas supply to be intractable. By one estimate, there are $6 billion worth of gas-fired projects languishing in the planning stage for want of long-term gas supply that is acceptable to project lenders. Worse still, as the authors are aware, some currently operating gas-fired projects lack such a supply, thus forcing the developer to rely on the spot market for gas as an interim (and unsatisfactory) solution. Although spot market prices in the deregulated natural gas industry have remained relatively low over several years, long-term gas supply has become problematic, particularly for power projects whose economics typically require an assured supply at a determined price over a multiyear period. In short, while there is an increasing demand for gas as a preferred source of fuel supply for power projects, there are discontinuities in the approaches taken to contracting for that supply by producers and developers. These concern primarily allocation of the risk of commodity-driven price increases during the term of the fuel supply contract. Without a means of accommodating price-related risk, the parties will inevitably find themselves at an impasse in contract negotiations. If there is a barrier to the independent power generation industry's vertical integration into gas production, it is the fundamental insularity of the two industries. As they have discovered, it may be indispensable for gas producers and power developers to employ intermediaries familiar with both industries in order to consummate appropriate joint-venture drilling programs and reserve acquisitions. Given the economic consequences of doing so successfully, however, they believe such programs and acquisitions may become an integral part of independent power developers' business strategy in the 1990s and beyond

  6. Independent Study Project, Topic: Topology.

    Science.gov (United States)

    Notre Dame High School, Easton, PA.

    Using this guide and the four popular books noted in it, a student, working independently, will learn about some of the classical ideas and problems of topology: the Meobius strip and Klein bottle, the four color problem, genus of a surface, networks, Euler's formula, and the Jordan Curve Theorem. The unit culminates in a project of the students'…

  7. Financial Energy Conservation Projects at Independent Colleges and Universities.

    Science.gov (United States)

    Morrell, L. R.

    1981-01-01

    Factors affecting financial decisions for energy conservation projects at independent colleges and universities and methods that may be used when making a financial investment decision are examined, along with sources of funding for the projects. Projects that result in the conservation of energy resources might, in a time of extreme shortages,…

  8. Experience in independent power production: Two projects that closed

    Energy Technology Data Exchange (ETDEWEB)

    Kappaz, M.H.

    1994-12-31

    K and M Engineering and Consulting Corporation`s experience in independent power production is outlined. The following topics are discussed: the KMR Power Corporation, K and M strengths and strategy, key success factors, project experience, selected projects, and capital structure.

  9. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  10. Financing biotechnology projects: lender due diligence requirements and the role of independent technical consultants.

    Science.gov (United States)

    Keller, J B; Plath, P B

    1999-01-01

    An increasing number of biotechnology projects are being brought to commercialization using conventional structured finance sources, which have traditionally only been available to proven technologies and primary industries. Attracting and securing competitive cost financing from mainstream lenders, however, will require the sponsor of a new technology or process to undergo a greater level of due diligence. The specific areas and intensity of investigation, which are typically required by lenders in order to secure long-term financing for biotechnology-based manufacturing systems, is reviewed. The processes for evaluating the adequacy of prior laboratory testing and pilot plant demonstrations is discussed. Particular emphasis is given to scale-up considerations and the ability of the proposed facility design to accommodate significant modifications, in the event that scale-up problems are encountered.

  11. South African CSP projects under the REIPPP programme - Requirements, challenges and opportunities

    Science.gov (United States)

    Relancio, Javier; Cuellar, Alberto; Walker, Gregg; Ettmayr, Chris

    2016-05-01

    Thus far seven Concentrated Solar Power (CSP) projects have been awarded under the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), totalling 600MW: one project is in operation, four under construction and two on their way to financial close. This provides an excellent opportunity for analysis of key features of the projects that have contributed to or detracted from the programme's success. The paper draws from Mott MacDonald's involvement as Technical Advisor on the seven CSP projects that have been successful under the REIPPPP to date as well as other global CSP developments. It presents how various programme requirements have affected the implementation of projects, such as the technical requirements, time of day tariff structure, economic development requirements and the renewable energy grid code. The increasingly competitive tariffs offered have encouraged developers to investigate efficiency maximising project configurations and cost saving mechanisms, as well as featuring state of the art technology in their proposals. The paper assesses the role of the project participants (developers, lenders and government) with regards to these innovative technologies and solutions. In our paper we discuss the status of projects and the SA market, analysing the main challenges and opportunities that in turn have influenced various aspects such as technology choice, operational regimes and supply chain arrangements.

  12. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    Energy Technology Data Exchange (ETDEWEB)

    Kent Norris

    2009-09-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

  13. Independence requirements for anti-corruption institutions

    African Journals Online (AJOL)

    The Court's approach and these apparent requirements are compared with current provisions for political 'independence' of anti-corruption agencies in Australia and Indonesia, raising, in particular, an assessment of the arguments for and against (a) the need for an anti-corruption investigative agency to be separate from ...

  14. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  15. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  16. Hanford Environmental Dose Reconstruction Project independent direction and oversight

    International Nuclear Information System (INIS)

    Blazek, M.L.; Power, M.

    1991-01-01

    Hanford was selected in 1942 as one of the sites for the Manhattan Project. It produced plutonium for one of the world's first nuclear weapons. The US Department of Energy (DOE) and its predecessors continued to make plutonium for nuclear weapons at Hanford for more than four decades. In the early days of Hanford operations, radioactive materials routinely were released to the environment by many processes. The DOE disclosed documents about these releases in 1986. In 1987, Washington, Oregon, and regional Indian tribes gathered an independent panel of experts. This group recommended dose reconstruction and health effects feasibility studies. Later that year, DOE hired Battelle Pacific Northwest Laboratory (PNL) to reconstruct potential public radiation doses from Hanford's past releases of radioactive material. The DOE agreed with the states and tribes that project direction would come from an independent technical steering panel (TSP). This approach was critical to gain public credibility for the project and the science. The TSP directs the project and makes policy. That is now clear - but, it was hard-earned. Conducting science in an open public process is new, challenging, and clearly worthwhile. The panel's product is good science that is believed and accepted by the public - our client

  17. Opening A New Independent Pharmacy 101

    Directory of Open Access Journals (Sweden)

    Azam Elabed

    2016-02-01

    Full Text Available Opening an independent pharmacy is a process that involves multiple components. The rationale of this project is to discuss different issues that must be investigated prior to opening a new independency pharmacy. This includes the location, structure of the corporation, start-up cost, picking a wholesaler, fulfilling state board requirements and Philadelphia requirements, having a valid license, making professional relationships, and knowing basic marketing research. Methods used include using the knowledge and expertise from an independent pharmacy owner, visiting pharmacies, and interviewing neighbors for basic marketing research. Many aspects of opening an independent pharmacy differ significantly from a retail pharmacy, as there are various issues within the pharmacy and outside the pharmacy that must be extensively researched prior to opening in order to be successful.   Type: Student Project

  18. Using Independent Research Projects to Foster Learning in the Comparative Vertebrate Anatomy Laboratory

    Science.gov (United States)

    Ghedotti, Michael J.; Fielitz, Christopher; Leonard, Daniel J.

    2005-01-01

    This paper presents a teaching methodology involving an independent research project component for use in undergraduate Comparative Vertebrate Anatomy laboratory courses. The proposed project introduces cooperative, active learning in a research context to comparative vertebrate anatomy. This project involves pairs or groups of three students…

  19. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  20. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  1. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  2. Requirements: Towards an understanding on why software projects fail

    Science.gov (United States)

    Hussain, Azham; Mkpojiogu, Emmanuel O. C.

    2016-08-01

    Requirement engineering is at the foundation of every successful software project. There are many reasons for software project failures; however, poorly engineered requirements process contributes immensely to the reason why software projects fail. Software project failure is usually costly and risky and could also be life threatening. Projects that undermine requirements engineering suffer or are likely to suffer from failures, challenges and other attending risks. The cost of project failures and overruns when estimated is very huge. Furthermore, software project failures or overruns pose a challenge in today's competitive market environment. It affects the company's image, goodwill, and revenue drive and decreases the perceived satisfaction of customers and clients. In this paper, requirements engineering was discussed. Its role in software projects success was elaborated. The place of software requirements process in relation to software project failure was explored and examined. Also, project success and failure factors were also discussed with emphasis placed on requirements factors as they play a major role in software projects' challenges, successes and failures. The paper relied on secondary data and empirical statistics to explore and examine factors responsible for the successes, challenges and failures of software projects in large, medium and small scaled software companies.

  3. 24 CFR 234.26 - Project requirements.

    Science.gov (United States)

    2010-04-01

    ... Commissioner for the purpose of constructing or converting the project in phases or stages, any special right..., the management company, the real estate broker, and the project developer, but the lender must ensure... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Project requirements. 234.26...

  4. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    International Nuclear Information System (INIS)

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  5. Requirements in engineering projects

    CERN Document Server

    Fernandes, João M

    2016-01-01

    This book focuses on various topics related to engineering and management of requirements, in particular elicitation, negotiation, prioritisation, and documentation (whether with natural languages or with graphical models). The book provides methods and techniques that help to characterise, in a systematic manner, the requirements of the intended engineering system.  It was written with the goal of being adopted as the main text for courses on requirements engineering, or as a strong reference to the topics of requirements in courses with a broader scope. It can also be used in vocational courses, for professionals interested in the software and information systems domain.   Readers who have finished this book will be able to: - establish and plan a requirements engineering process within the development of complex engineering systems; - define and identify the types of relevant requirements in engineering projects; - choose and apply the most appropriate techniques to elicit the requirements of a giv...

  6. Ownership options, financing structures, and regulatory considerations affecting independent power production projects

    International Nuclear Information System (INIS)

    Knapp, G.M.

    1990-01-01

    In this paper is a framework for analysis of the legal, financing, and policy differences between independent power production projects (IPPs) and projects with qualifying facility status (QFs) under the Public Utility Regulatory Policies Act (PURPA). At a basic level, there is no fundamental difference in types of ownership and financing structures available to IPPs and QFS. The key consideration, though, is the regulatory and legal implications to project participants. Significant issues arise for equity participants, lenders, developers, and project operators that are considering IPP projects. Of course, many of these same issues apply to certain types of QF projects that are not fully exempt from the Public Utility Holding Company Act (PUHCA) and the Federal Power Act (FPA)

  7. 24 CFR 92.612 - Project requirements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project requirements. 92.612 Section 92.612 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development HOME INVESTMENT PARTNERSHIPS PROGRAM American Dream Downpayment Initiative § 92.612 Project...

  8. Economic impact analysis of independent power projects in British Columbia

    International Nuclear Information System (INIS)

    2009-12-01

    Independent power producer (IPP) projects have been active in British Columbia's (BC) regulated electricity market since the late 1980s. The 49 IPP projects developed in the province currently account for approximately 10 per cent of BC's electricity generation, and IPP development continues to expand in nearly every region. This study presented an economic impact analysis of IPP projects in BC. The economic impacts of IPP projects were divided into 2 categories: (1) existing IPP projects, and (2) potential IPP projects. The study showed that the total power potential supplied by BC IPP projects would increase from a current level of 5940 annual GWh to approximately 14,149 GWh. BC could also be generating a further 21,321 GWh of annual output to service demand domestically in addition to exporting to the United States. The value of capital investment in existing IPPs across BC was estimated at $2.8 billion. Capital investment in potential IPPs was estimated at $26.1 billion in 2009 constant dollars. Government revenues generated through the construction phase of potential IPP projects were estimated at $1.6 billion. IPP projects are expected to have a significant impact on First Nations groups, contribute to provincial energy self-sufficiency, and have little to no greenhouse gas (GHG) emissions. 25 refs., 19 tabs., 24 figs.

  9. Practical experience with digital I and C retrofit projects gathered by independent experts

    International Nuclear Information System (INIS)

    Zeck, Kurt; Schildheuer, Reinhard; Weich, Alfred

    2005-01-01

    As independent experts, we have accompanied a series of major projects where plant control systems have been retrofitted with digital I and C technology. As General Expert Inspectors of our authority, we have investigated, inspected and certified such projects - from defining the tasks at hand trough planning, approving, implementing and commissioning down to the regular operation of the equipment. Our special focus has been on the proper adherence to the relevant safety issues in nuclear plants in accordance with the current state-of-the-art in science and technology, and to the applicable codes of practice. In September 2004, at the international 'Nuclear Plant Instrumentation, Control and Human Machine Interface Technology' meeting in Columbus/Ohio, we presented some major retrofit projects and reported about how we, as independent official experts, accompany and monitor the activities of retrofitting plants with advanced digital safety I and C equipment, from the safety point of view. With current report, we would like to provide more detailed information about the practical experience gained with digital safety I and C retrofits and the conclusions drawn for currently ongoing retrofit projects. We will look at both the technical and licensing aspects of implementing such projects

  10. ORGANIZATION OF INDEPENDENT WORK STUDENTS OF MASTER OF TELECOMMUNICATION TRAINING PROJECT

    Directory of Open Access Journals (Sweden)

    L. Perminova

    2013-03-01

    Full Text Available The article explains the need to implement active learning of students in the practice of the organization їh homework. In particular, the author proved the rationality of the use of telecommunications projects and use the web in quest of independent study students graduate.

  11. 24 CFR 511.11 - Project requirements.

    Science.gov (United States)

    2010-04-01

    ... low income occupancy or rent projections, or restrictions on return on investment or other similar policies that prevent an owner, whether for-profit or non-profit, from maximizing return or setting rent... requirements and with the affirmative marketing requirements and procedures adopted under § 511.13, for the...

  12. Hydrocarbons. Independent Learning Project for Advanced Chemistry (ILPAC). Unit O1.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on hydrocarbons is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit is divided into sections dealing with alkanes, alkenes, alkynes, arenes, and several aspects of the petroleum industry. Two experiments, exercises (with answers), and pre- and post-tests are included.…

  13. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  14. 77 FR 4632 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Science.gov (United States)

    2012-01-30

    ... Federal Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions... Regulation Supplement (DFARS) to require major contractors to report independent research and development (IR... 11414 on March 2, 2011, to revise requirements for reporting IR&D projects to the Defense Technical...

  15. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  16. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  17. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  18. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  19. 18 CFR 806.4 - Projects requiring review and approval.

    Science.gov (United States)

    2010-04-01

    ... result of a change of the name, identity, internal corporate structure or place of organization and does... period, and undergoing a change of ownership, unless such project satisfies the requirements of..., and undergoing a change of ownership, unless such project satisfies the requirements of paragraphs (b...

  20. Superconducting dipole magnet requirements for the Fermilab Phase 3 upgrade, SSC high energy booster, and Fermilab independent collider

    International Nuclear Information System (INIS)

    Nicol, T.H.; Kerby, J.S.

    1989-09-01

    In July 1988 a small working group was formed to develop a conceptual design for a high field superconducting dipole magnet suitable for use in the Phase III upgrade at Fermilab. The Phase III upgrade calls for replacement of the existing Tevatron with higher field magnets to boost the energy of the fixed target program to 1.5 TeV and to add a 1.8 TeV collider program. As the work of this group evolved it became clear that the resulting design might be applicable to more than just the proposed upgrade. In particular, it seemed plausible that the work might be applicable to the high energy booster (HEB) for the SSC. At the Breckenridge Workshop in August 1989 interest in a third project began to surface, namely the revamping of an earlier proposal for a dedicated collider at Fermilab. We refer to this proposal as the FNAL Independent Collider. The requirements for the dipole magnets for this independent collider appear to be remarkably similar to those proposed for the Phase III upgrade and the SSC HEB. The purpose of this report is to compare the conceptual design of the dipoles developed for the Phase III proposal with the requirements of those for the SSC HEB, the FNAL Independent Collider, and a hybrid design which could serve the needs of both. The Phase III design will be used as the reference point for parameter scaling. 4 figs., 3 tabs

  1. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  2. Projection of US LWR spent fuel storage requirements

    International Nuclear Information System (INIS)

    Fletcher, J.F.; Cole, B.M.; Purcell, W.L.; Rau, R.G.

    1982-11-01

    The spent fuel storage requirements projection is based on data supplied for each operating or planned nuclear power power plant by the operting utilities. The data supplied by the utilities encompassed details of plant operating history, past records of fuel discharges, current inventories in reactor spent fuel storage pools, and projections of future discharge patterns. Data on storage capacity of storage pools and on characterization of the discharged fuel are also included. The data supplied by the utilities, plus additional data from other appropriate sources, are maintained on a computerized data base by Pacific Northwest Laboratory. The spent fuel requirements projection was based on utility data updated and verified as of December 31, 1981

  3. International power projections and capital requirements

    International Nuclear Information System (INIS)

    Ann, H.

    1989-01-01

    This work is related to the international power projections and capital requirements of all kinds of energy and the share of electricity. It is also related to the so-called greenhouse effect carbon dioxide concentration in atmosphere. (A.C.A.S.)

  4. National Land Imaging Requirements (NLIR) Pilot Project summary report: summary of moderate resolution imaging user requirements

    Science.gov (United States)

    Vadnais, Carolyn; Stensaas, Gregory

    2014-01-01

    Under the National Land Imaging Requirements (NLIR) Project, the U.S. Geological Survey (USGS) is developing a functional capability to obtain, characterize, manage, maintain and prioritize all Earth observing (EO) land remote sensing user requirements. The goal is a better understanding of community needs that can be supported with land remote sensing resources, and a means to match needs with appropriate solutions in an effective and efficient way. The NLIR Project is composed of two components. The first component is focused on the development of the Earth Observation Requirements Evaluation System (EORES) to capture, store and analyze user requirements, whereas, the second component is the mechanism and processes to elicit and document the user requirements that will populate the EORES. To develop the second component, the requirements elicitation methodology was exercised and refined through a pilot project conducted from June to September 2013. The pilot project focused specifically on applications and user requirements for moderate resolution imagery (5–120 meter resolution) as the test case for requirements development. The purpose of this summary report is to provide a high-level overview of the requirements elicitation process that was exercised through the pilot project and an early analysis of the moderate resolution imaging user requirements acquired to date to support ongoing USGS sustainable land imaging study needs. The pilot project engaged a limited set of Federal Government users from the operational and research communities and therefore the information captured represents only a subset of all land imaging user requirements. However, based on a comparison of results, trends, and analysis, the pilot captured a strong baseline of typical applications areas and user needs for moderate resolution imagery. Because these results are preliminary and represent only a sample of users and application areas, the information from this report should only

  5. Spent nuclear fuel project multi-canister overpack, additional NRC requirements

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1998-01-01

    The US Department of Energy (DOE), established in the K Basin Spent Nuclear Fuel Project Regulatory Policy, dated August 4, 1995 (hereafter referred to as the Policy), the requirement for new Spent Nuclear Fuel (SNF) Project facilities to achieve nuclear safety equivalency to comparable US Nuclear Regulatory Commission (NRC)-licensed facilities. For activities other than during transport, when the Multi-Canister Overpack (MCO) is used and resides in the Canister Storage Building (CSB), Cold Vacuum Drying (CVD) facility or Hot Conditioning System, additional NRC requirements will also apply to the MCO based on the safety functions it performs and its interfaces with the SNF Project facilities. An evaluation was performed in consideration of the MCO safety functions to identify any additional NRC requirements needed, in combination with the existing and applicable DOE requirements, to establish nuclear safety equivalency for the MCO. The background, basic safety issues and general comparison of NRC and DOE requirements for the SNF Project are presented in WHC-SD-SNF-DB-002

  6. The Role of Requirements in the Success or Failure of Software Projects

    OpenAIRE

    Hussain, Azham; Mkpojiogu, Emmanuel O.C.; Kamal, Fazillah Mohmad

    2016-01-01

    Requirements engineering is pivotal and central to every successful software development project. There are several reasons why software projects fail; however, poorly elicited, documented, validated and managed requirements contribute grossly to software projects failure. Software project failures are normally very costly and risky and these could even a times be life threatening also. Projects that overlook requirements engineering processes often suffer or are most likely to suffer from fa...

  7. 42 CFR 65.4 - Project requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Project requirements. 65.4 Section 65.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING... appropriate academic disciplines and talents. Joint applications must describe the cooperative arrangements...

  8. Projection correlation between two random vectors.

    Science.gov (United States)

    Zhu, Liping; Xu, Kai; Li, Runze; Zhong, Wei

    2017-12-01

    We propose the use of projection correlation to characterize dependence between two random vectors. Projection correlation has several appealing properties. It equals zero if and only if the two random vectors are independent, it is not sensitive to the dimensions of the two random vectors, it is invariant with respect to the group of orthogonal transformations, and its estimation is free of tuning parameters and does not require moment conditions on the random vectors. We show that the sample estimate of the projection correction is [Formula: see text]-consistent if the two random vectors are independent and root-[Formula: see text]-consistent otherwise. Monte Carlo simulation studies indicate that the projection correlation has higher power than the distance correlation and the ranks of distances in tests of independence, especially when the dimensions are relatively large or the moment conditions required by the distance correlation are violated.

  9. MORE - Management of requirements in NPP modernisation projects. Project report 2006

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Thunem, H.P.J. [IFE (Norway); Valkonen, J. [VTT (Finland)

    2007-02-15

    The purpose of the report is to document the work and related activities in the period January 1 December 31 in 2006, including dissemination activities. The work in this period has been concentrated on further research for adopting an approach for dependable requirements engineering and its supporting tool. The majority of the efforts in 2006, however, was spent on making the researchers, developers, utilities and licensees more aware of the importance of the area of requirements engineering, and in that respect organising an international seminar on dependable requirements engineering. This seminar was defined as a deliverable in the Activity Plan for 2006 and became also the most important deliverable for 2006. Therefore, this report naturally features a detailed summary of the seminar, which proved to be a true success and at the same time a door opener for more initiatives within the topic, proposed by several participants. More efforts within dissemination of the background and objectives of the project MORE within the nuclear community and towards NPPs that do carry out modernisation projects continued to be one important focus. (au)

  10. MORE - Management of requirements in NPP modernisation projects. Project report 2006

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Thunem, H.P.J.; Valkonen, J.

    2007-02-01

    The purpose of the report is to document the work and related activities in the period January 1 December 31 in 2006, including dissemination activities. The work in this period has been concentrated on further research for adopting an approach for dependable requirements engineering and its supporting tool. The majority of the efforts in 2006, however, was spent on making the researchers, developers, utilities and licensees more aware of the importance of the area of requirements engineering, and in that respect organising an international seminar on dependable requirements engineering. This seminar was defined as a deliverable in the Activity Plan for 2006 and became also the most important deliverable for 2006. Therefore, this report naturally features a detailed summary of the seminar, which proved to be a true success and at the same time a door opener for more initiatives within the topic, proposed by several participants. More efforts within dissemination of the background and objectives of the project MORE within the nuclear community and towards NPPs that do carry out modernisation projects continued to be one important focus. (au)

  11. 42 CFR 50.208 - Program or project requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Program or project requirements. 50.208 Section 50.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects § 50.208...

  12. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  13. Independent power project finance rating criteria

    International Nuclear Information System (INIS)

    Goldsmith, D.; Chew W.; Moulton, C.

    1992-01-01

    Continuing growth of project financing for non-utility generators in the US and abroad has led to growing focus on their credit strength. In general, the financings remain relatively risky and would likely be rated below investment grade, because of various factors: loose power purchase arrangements, poor match between power pricing and fuel costs, aggressive leverage, troubled operating performance. But S and P believes some projects have the credit strength to support investment grade ratings. As traditional financing markets for these projects --- bank lending and private placements with highly specialized institutional investors --- have contracted, project sponsors and developers are considering broader markets. These include institutional investors without specialized focus on power project finance. In these markets, distinctions among projects may lead to greater liquidity and efficiency in developing the pricing and terms under which projects can be financed. This paper reports that ratings are most appropriate for projects seeking permanent financing as they enter commercial operations. They also may be useful for projects which have been operating for some time and for some very strong projects which are raising construction financing. To guide both project developers and investors in project financing, S and P has developed the following approach for rating these types of financings

  14. The Gaseous State. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P1.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on the gaseous state is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit consists of two levels. Level one deals with the distinctive characteristics of gases, then considers the gas laws, in particular the ideal gas equation and its applications. Level two concentrates on…

  15. Equilibrium I: Principles. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P2.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on the principles of equilibrium is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit consists of two levels. After a treatment of non-mathematical aspects in level one (the idea of a reversible reaction, characteristics of an equilibrium state, the Le Chatelier's principle),…

  16. Structuring Requirements in a Multi-Project Environment in the Construction Industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    2012-01-01

    Being in control of requirements in building projects is vital, since it helps securing the often small profit margins and the reputation of the responsible company. Hence this research aims to introduce requirements management to the construction industry. By means of case study and action...... in this industry, yet, success is here defined as an accomplished and accepted implementation of requirements management processes that are used by the relevant project members in their daily work and where the benefits of implementing requirements management outweighs the cost of invested resources. Furthermore...... it is argued that when running technology development, product development, product platform development, and a portfolio of building projects at the same time the use of requirements management is advantageous and an intelligent way of structuring requirements is needed. This article also demonstrates...

  17. 76 FR 11414 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Science.gov (United States)

    2011-03-02

    ... Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions (DFARS Case... (DFARS) to require contractors to report independent research and development (IR&D) projects generating... to the Defense Technical Information Center (DTIC). Beginning in the 1990s, DoD reduced its technical...

  18. Projected uranium requirements of developing countries

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The objective of this paper is to examine the uranium requirements of developing countries both in aggregate and individually. Although the cumulative uranium requirements of these countries are expected to account for less than eight percent of total requirements, the fact that many of these countries are expressing renewed interest in nuclear is, in itself, encouraging. The countries analyzed in this paper are Argentina, Brazil, Egypt, India, Israel, Mexico, Pakistan, South Africa, South Korea and Taiwan. For each country, the existing and planned nuclear capacity levels have been identified and capacity factors have been projected. For countries with no previous nuclear power, the world weighted average capacity factor for the specific reactor type is utilized. Other factors influencing nuclear power demand and operations of these developing countries will be discussed, and finally, uranium requirements based on a calculated optimal tails assay of .30 will be provided

  19. Project Independence: Construction of an Integrated Biorefinery for Production of Renewable Biofuels at an Existing Pulp and Paper Mill

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, Douglas

    2012-06-01

    Project Independence proposed to construct a demonstration biomass-to-liquids (BTL) biorefinery in Wisconsin Rapids, isconsin. The biorefinery was to be co-located at the existing pulp and paper mill, NewPage Wisconsin System Incorporated’s Wisconsin Rapids Mill, and when in full operation would both generate renewable energy for Wisconsin Rapids Mill and produce liquid fuels from abundant and renewable lignocellulosic biomass. The biorefinery would serve to validate the thermochemical pathway and economic models for BTL production using forest residuals and wood waste, providing a basis for proliferating BTL conversion technologies throughout the United States. It was a project goal to create a compelling new business model for the pulp and paper industry, and support the nation’s goal for increasing renewable fuels production and reducing its dependence on foreign oil. NewPage Corporation planned to replicate this facility at other NewPage Corporation mills after this first demonstration scale plant was operational and had proven technical and economic feasibility. An overview of the process begins with biomass being harvested, sized, conditioned and fed into a ThermoChem Recovery International (TRI) steam reformer where it is converted to high quality synthetic gas (syngas). The syngas is then cleaned, compressed, scrubbed, polished and fed into the Fischer-Tropsch (F-T) catalytic reactors where the gas is converted into two, sulfur-free, clean crude products which will be marketed as revenue generating streams. Additionally, the Fischer-Tropsch products could be upgraded for use in automotive, aviation and chemical industries as valuable products, if desired. As the Project Independence project set out to prove forest products could be used to commercially produce biofuels, they planned to address and mitigate issues as they arose. In the early days of the Project Independence project, the plant was sized to process 500 dry tons of biomass per day but would

  20. Density-independent population projection trajectories of chromosome-substituted lines resistant and susceptible to organophosphate insecticides in Drosophila melanogaster

    Directory of Open Access Journals (Sweden)

    Miyo Takahiro

    2004-11-01

    Full Text Available Abstract Background Seasonal fluctuations in susceptibility to organophosphate insecticides were observed in the Katsunuma population of Drosophila melanogaster for two consecutive years; susceptibility to three organophosphates tended to increase in the fall. To examine the hypothesis that variation in fitness among resistant and susceptible genotypes could trigger the change of genetic constitution within the fall population, we investigated density-independent population projection trajectories starting from single adult females with characteristics of chromosome-substituted lines resistant and susceptible to the three organophosphates. Results Density-independent population projection trajectories, expressed as the ratios of the number of each chromosome-substituted line to that of line SSS, for which all chromosomes were derived from the susceptible line, showed significant declines in numbers with time for all the resistant chromosome-substituted lines. Conclusion The declining tendency in the density-independent population projection trajectories of the resistant chromosome-substituted lines could explain the simultaneous decline in the levels of resistance to the three organophosphates, observed in the Katsunuma population in the fall.

  1. Optimizing experimental parameters for the projection requirement in HAADF-STEM tomography

    International Nuclear Information System (INIS)

    Aveyard, R.; Zhong, Z.; Batenburg, K.J.; Rieger, B.

    2017-01-01

    Highlights: • The extent to which HAADF-STEM meets the projection requirement has been studied. • Multislice simulations used to model beam propagation and study signal linearity. • Propagation in crystalline and amorphous materials considered. • Optimal experimental set-up for the projection requirement is discussed. - Abstract: Tomographic reconstruction algorithms offer a means by which a tilt-series of transmission images can be combined to yield a three dimensional model of the specimen. Conventional reconstruction algorithms assume that the measured signal is a linear projection of some property, typically the density, of the material. Here we report the use of multislice simulations to investigate the extent to which this assumption is met in HAADF-STEM imaging. The use of simulations allows for a systematic survey of a range of materials and microscope parameters to inform optimal experimental design. Using this approach it is demonstrated that the imaging of amorphous materials is in good agreement with the projection assumption in most cases. Images of crystalline specimens taken along zone-axes are found to be poorly suited for conventional linear reconstruction algorithms due to channelling effects which produce enhanced intensities compared with off-axis images, and poor compliance with the projection requirement. Off-axis images are found to be suitable for reconstruction, though they do not strictly meet the linearity requirement in most cases. It is demonstrated that microscope parameters can be selected to yield improved compliance with the projection requirement.

  2. Optimizing experimental parameters for the projection requirement in HAADF-STEM tomography

    Energy Technology Data Exchange (ETDEWEB)

    Aveyard, R., E-mail: r.a.aveyard@tudelft.nl [Department of Imaging Physics, Delft University of Technology, 2628CJ Delft (Netherlands); Zhong, Z.; Batenburg, K.J. [Centrum Wiskunde and Informatica, Science Park 123, NL-1098 XG Amsterdam (Netherlands); Rieger, B., E-mail: b.rieger@tudelft.nl [Department of Imaging Physics, Delft University of Technology, 2628CJ Delft (Netherlands)

    2017-06-15

    Highlights: • The extent to which HAADF-STEM meets the projection requirement has been studied. • Multislice simulations used to model beam propagation and study signal linearity. • Propagation in crystalline and amorphous materials considered. • Optimal experimental set-up for the projection requirement is discussed. - Abstract: Tomographic reconstruction algorithms offer a means by which a tilt-series of transmission images can be combined to yield a three dimensional model of the specimen. Conventional reconstruction algorithms assume that the measured signal is a linear projection of some property, typically the density, of the material. Here we report the use of multislice simulations to investigate the extent to which this assumption is met in HAADF-STEM imaging. The use of simulations allows for a systematic survey of a range of materials and microscope parameters to inform optimal experimental design. Using this approach it is demonstrated that the imaging of amorphous materials is in good agreement with the projection assumption in most cases. Images of crystalline specimens taken along zone-axes are found to be poorly suited for conventional linear reconstruction algorithms due to channelling effects which produce enhanced intensities compared with off-axis images, and poor compliance with the projection requirement. Off-axis images are found to be suitable for reconstruction, though they do not strictly meet the linearity requirement in most cases. It is demonstrated that microscope parameters can be selected to yield improved compliance with the projection requirement.

  3. An Engineering Method of Civil Jet Requirements Validation Based on Requirements Project Principle

    Science.gov (United States)

    Wang, Yue; Gao, Dan; Mao, Xuming

    2018-03-01

    A method of requirements validation is developed and defined to meet the needs of civil jet requirements validation in product development. Based on requirements project principle, this method will not affect the conventional design elements, and can effectively connect the requirements with design. It realizes the modern civil jet development concept, which is “requirement is the origin, design is the basis”. So far, the method has been successfully applied in civil jet aircraft development in China. Taking takeoff field length as an example, the validation process and the validation method of the requirements are detailed introduced in the study, with the hope of providing the experiences to other civil jet product design.

  4. Appraising the value of independent EIA follow-up verifiers

    Energy Technology Data Exchange (ETDEWEB)

    Wessels, Jan-Albert, E-mail: janalbert.wessels@nwu.ac.za [School of Geo and Spatial Sciences, Department of Geography and Environmental Management, North-West University, C/O Hoffman and Borcherd Street, Potchefstroom, 2520 (South Africa); Retief, Francois, E-mail: francois.retief@nwu.ac.za [School of Geo and Spatial Sciences, Department of Geography and Environmental Management, North-West University, C/O Hoffman and Borcherd Street, Potchefstroom, 2520 (South Africa); Morrison-Saunders, Angus, E-mail: A.Morrison-Saunders@murdoch.edu.au [School of Geo and Spatial Sciences, Department of Geography and Environmental Management, North-West University, C/O Hoffman and Borcherd Street, Potchefstroom, 2520 (South Africa); Environmental Assessment, School of Environmental Science, Murdoch University, Australia. (Australia)

    2015-01-15

    Independent Environmental Impact Assessment (EIA) follow-up verifiers such as monitoring agencies, checkers, supervisors and control officers are active on various construction sites across the world. There are, however, differing views on the value that these verifiers add and very limited learning in EIA has been drawn from independent verifiers. This paper aims to appraise how and to what extent independent EIA follow-up verifiers add value in major construction projects in the developing country context of South Africa. A framework for appraising the role of independent verifiers was established and four South African case studies were examined through a mixture of site visits, project document analysis, and interviews. Appraisal results were documented in the performance areas of: planning, doing, checking, acting, public participating and integration with other programs. The results indicate that independent verifiers add most value to major construction projects when involved with screening EIA requirements of new projects, allocation of financial and human resources, checking legal compliance, influencing implementation, reporting conformance results, community and stakeholder engagement, integration with self-responsibility programs such as environmental management systems (EMS), and controlling records. It was apparent that verifiers could be more creatively utilized in pre-construction preparation, providing feedback of knowledge into assessment of new projects, giving input to the planning and design phase of projects, and performance evaluation. The study confirms the benefits of proponent and regulator follow-up, specifically in having independent verifiers that disclose information, facilitate discussion among stakeholders, are adaptable and proactive, aid in the integration of EIA with other programs, and instill trust in EIA enforcement by conformance evaluation. Overall, the study provides insight on how to harness the learning opportunities

  5. Appraising the value of independent EIA follow-up verifiers

    International Nuclear Information System (INIS)

    Wessels, Jan-Albert; Retief, Francois; Morrison-Saunders, Angus

    2015-01-01

    Independent Environmental Impact Assessment (EIA) follow-up verifiers such as monitoring agencies, checkers, supervisors and control officers are active on various construction sites across the world. There are, however, differing views on the value that these verifiers add and very limited learning in EIA has been drawn from independent verifiers. This paper aims to appraise how and to what extent independent EIA follow-up verifiers add value in major construction projects in the developing country context of South Africa. A framework for appraising the role of independent verifiers was established and four South African case studies were examined through a mixture of site visits, project document analysis, and interviews. Appraisal results were documented in the performance areas of: planning, doing, checking, acting, public participating and integration with other programs. The results indicate that independent verifiers add most value to major construction projects when involved with screening EIA requirements of new projects, allocation of financial and human resources, checking legal compliance, influencing implementation, reporting conformance results, community and stakeholder engagement, integration with self-responsibility programs such as environmental management systems (EMS), and controlling records. It was apparent that verifiers could be more creatively utilized in pre-construction preparation, providing feedback of knowledge into assessment of new projects, giving input to the planning and design phase of projects, and performance evaluation. The study confirms the benefits of proponent and regulator follow-up, specifically in having independent verifiers that disclose information, facilitate discussion among stakeholders, are adaptable and proactive, aid in the integration of EIA with other programs, and instill trust in EIA enforcement by conformance evaluation. Overall, the study provides insight on how to harness the learning opportunities

  6. Independent technical review, handbook

    International Nuclear Information System (INIS)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project

  7. Independent technical review, handbook

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  8. Defining project scenarios for the agile requirements engineering product-line development questionnaire

    OpenAIRE

    Feng, Kunwu; Lempert, Meli; Tang, Yan; Tian, Kun; Cooper, Kendra M.L.; Franch Gutiérrez, Javier

    2007-01-01

    Current agile methods are focused on practices of small, rapid developing and iteration, more people oriented, less documentation projects, and the use of the methods in large, product line projects are somehow difficult. UTD and GESSI have started a project to develop an expert system that can assist a requirements enginer in selecting a requirements engineering process that is well suited for their project, in particular with respect to the use of agile and product line engineering methods....

  9. From state to market and back again: Egypt's experiment with independent power projects

    International Nuclear Information System (INIS)

    Eberhard, Anton; Gratwick, Katharine

    2007-01-01

    This paper focuses on Egypt's three independent power projects (IPPs), evaluating the context in which they were developed as well as how the context has changed. Initially the Egyptian government planned a series of 15 gas-fired, steam cycle, independent power projects. The first three, developed by InterGen, Edison and Electricite de France (EdF), yielded among the lowest generation tariffs across the developing world at US$0.025 per kilowatt hour (kWh). After the currency devaluation of 2002-2003, however, plans were shelved. Current plans, through to 2007, are now to be executed by the state-owned Egyptian Electricity Holding Company (EEHC), with concessionary funding provided by multilateral and bilateral agencies. Although capacity charges (in pound equivalency) have doubled, the power purchase agreements (PPAs) signed with each of the IPPs have held. Furthermore, a new regulatory body has had no impact on the existing contracts. While the original developers have sold their equity stake, new firms, with an increased appetite for risk, are stepping in to take their place. Meanwhile Egypt's liquefied natural gas (LNG) industry has developed over night; in just 2 years the country has become the world's sixth largest exporter, which raises questions about the long-term sustainability of gas-fired plants. (author)

  10. 18 CFR 401.36 - Water supply projects-Conservation requirements.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Water supply projects-Conservation requirements. 401.36 Section 401.36 Conservation of Power and Water Resources DELAWARE RIVER BASIN... Compact § 401.36 Water supply projects—Conservation requirements. Maximum feasible efficiency in the use...

  11. Homogenization of independent inspection criteria of Quality Assurance in the maintenance activities

    International Nuclear Information System (INIS)

    Gomez Cardinanos, R.

    2012-01-01

    Among the official documents governing the operation of Spanish nuclear power plants is the Quality Manual and Quality Assurance. This manual gives a formal answer to the requirements of the regulations and the Nuclear Safety Council. To monitor the compliance of its requirements, the plants are controlled by independent organizations. Since 2007, in nuclear Sta. Maria de Garona is developed a project to improve the performance of the QA inspectors during maintenance activities. Results of the project have been edited data sheets on specific activities of maintenance. The project aims to incorporate sheets that help QA inspectors in their daily inspection.

  12. Preliminary Design Requirements Document for Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-27

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1.

  13. Preliminary Design Requirements Document for Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This document sets forth functional requirements, performance requirements, and design constraints for the tank farm systems elements identified in Section 3.1 of this document. These requirements shall be used to develop the Design Requirements Baseline for those system elements. System Overview--The tank farm system at Hanford Site currently consists of 149 single shell tanks and 28 double shell tanks with associated facilities and equipment, located in 18 separate groupings. Each grouping is known as a tank farm. They are located in the areas designated as 200 West and 200 East. Table 1-1 shows the number of tanks in each farm. The farms are connected together through a transfer system consisting of piping, diversion boxes, Double Contained Receiver Tanks (DCRT) and other miscellaneous facilities and elements. The tank farm system also connects to a series of processing plants which generate radioactive and hazardous wastes. The primary functions of the tank farm system are to store, transfer, concentrate, and characterize radioactive and hazardous waste generated at Hanford, until the waste can be safely retrieved, processed and dispositioned. The systems provided by Project W-314 support the store and transfer waste functions. The system elements to be upgraded by Project W-314 are identified in Section 3.1

  14. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  15. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  16. Equilibrium II: Acids and Bases. Independent Learning Project for Advanced Chemistry (ILPAC). Unit P3.

    Science.gov (United States)

    Inner London Education Authority (England).

    This unit on equilibrium is one of 10 first year units produced by the Independent Learning Project for Advanced Chemistry (ILPAC). The unit, which consists of two levels, focuses on the application of equilibrium principles to equilibria involving weak acids and bases, including buffer solutions and indicators. Level one uses Le Chatelier's…

  17. Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements

    International Nuclear Information System (INIS)

    KLEM, M.J.

    2000-01-01

    In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the

  18. Clean air and project financing

    International Nuclear Information System (INIS)

    Zimmer, M.J.

    1992-01-01

    This article examines how environmental requirements are challenging the developers ability to secure financing for independent energy projects. The topics addressed in the article include a review of the US Environmental Protection Agency auction rules for acid rain emission allowances, short term and long term market demand, project financing issues, credit value and matching interests

  19. Improved application of independent component analysis to functional magnetic resonance imaging study via linear projection techniques.

    Science.gov (United States)

    Long, Zhiying; Chen, Kewei; Wu, Xia; Reiman, Eric; Peng, Danling; Yao, Li

    2009-02-01

    Spatial Independent component analysis (sICA) has been widely used to analyze functional magnetic resonance imaging (fMRI) data. The well accepted implicit assumption is the spatially statistical independency of intrinsic sources identified by sICA, making the sICA applications difficult for data in which there exist interdependent sources and confounding factors. This interdependency can arise, for instance, from fMRI studies investigating two tasks in a single session. In this study, we introduced a linear projection approach and considered its utilization as a tool to separate task-related components from two-task fMRI data. The robustness and feasibility of the method are substantiated through simulation on computer data and fMRI real rest data. Both simulated and real two-task fMRI experiments demonstrated that sICA in combination with the projection method succeeded in separating spatially dependent components and had better detection power than pure model-based method when estimating activation induced by each task as well as both tasks.

  20. Goodness-of-Fit Tests For Elliptical and Independent Copulas through Projection Pursuit

    Directory of Open Access Journals (Sweden)

    Jacques Touboul

    2011-04-01

    Full Text Available Two goodness-of-fit tests for copulas are being investigated. The first one deals with the case of elliptical copulas and the second one deals with independent copulas. These tests result from the expansion of the projection pursuit methodology that we will introduce in the present article. This method enables us to determine on which axis system these copulas lie as well as the exact value of these very copulas in the basis formed by the axes previously determined irrespective of their value in their canonical basis. Simulations are also presented as well as an application to real datasets.

  1. Project finance risks - getting it right first time

    International Nuclear Information System (INIS)

    Bain, F.

    1996-01-01

    Bankers seeking to invest in the construction of new power stations by independent power producers, face greater risks than those lending to companies. Independent risk and insurance advisers are used to assess project risk. ''Project finance'' has become increasingly popular as it allows projects to go ahead that could not be supported from sponsors' own resources. In addition, project finance means that various equity partners can join together in a joint venture company and limit their individual risk. Project finance can be delayed by differences between the needs of sponsors, financiers and insurers. The process can be speeded up by foreknowledge of bankers' requirements. (UK)

  2. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  3. Requirements for the project management in the client / engineering contractor relationship

    International Nuclear Information System (INIS)

    Hack, W.L.

    1995-01-01

    Investment projects impose a multitude of requirements upon clients and engineering contractors to cope with the management of project inherent conflicts. The paper reviews certain aspects on why such conflicts develop, and how they may be resolved. (orig.)

  4. Ligand-independent Thrombopoietin Mutant Receptor Requires Cell Surface Localization for Endogenous Activity*

    OpenAIRE

    Marty, Caroline; Chaligné, Ronan; Lacout, Catherine; Constantinescu, Stefan N.; Vainchenker, William; Villeval, Jean-Luc

    2009-01-01

    The activating W515L mutation in the thrombopoietin receptor (MPL) has been identified in primary myelofibrosis and essential thrombocythemia. MPL belongs to a subset of the cytokine receptor superfamily that requires the JAK2 kinase for signaling. We examined whether the ligand-independent MPLW515L mutant could signal intracellularly. Addition of the endoplasmic reticulum (ER) retention KDEL sequence to the receptor C terminus efficiently locked MPLW515L within its na...

  5. Experimentation on accuracy of non functional requirement prioritization approaches for different complexity projects

    OpenAIRE

    Raj Kumar Chopra; Varun Gupta; Durg Singh Chauhan

    2016-01-01

    Non functional requirements must be selected for implementation together with functional requirements to enhance the success of software projects. Three approaches exist for performing the prioritization of non functional requirements using the suitable prioritization technique. This paper performs experimentation on three different complexity versions of the industrial software project using cost-value prioritization technique employing three approaches. Experimentation is conducted to analy...

  6. Design requirements document for project W-520, immobilized low-activity waste disposal

    International Nuclear Information System (INIS)

    Ashworth, S.C.

    1998-01-01

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity

  7. Design requirements document for project W-520, immobilized low-activity waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, S.C.

    1998-08-06

    This design requirements document (DRD) identifies the functions that must be performed to accept, handle, and dispose of the immobilized low-activity waste (ILAW) produced by the Tank Waste Remediation System (TWRS) private treatment contractors and close the facility. It identifies the requirements that are associated with those functions and that must be met. The functional and performance requirements in this document provide the basis for the conceptual design of the Tank Waste Remediation System Immobilized Low-Activity Waste disposal facility project (W-520) and provides traceability from the program-level requirements to the project design activity.

  8. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  9. Experimentation on accuracy of non functional requirement prioritization approaches for different complexity projects

    Directory of Open Access Journals (Sweden)

    Raj Kumar Chopra

    2016-09-01

    Full Text Available Non functional requirements must be selected for implementation together with functional requirements to enhance the success of software projects. Three approaches exist for performing the prioritization of non functional requirements using the suitable prioritization technique. This paper performs experimentation on three different complexity versions of the industrial software project using cost-value prioritization technique employing three approaches. Experimentation is conducted to analyze the accuracy of individual approaches and the variation of accuracy with the complexity of the software project. The results indicate that selecting non functional requirements separately, but in accordance with functionality has higher accuracy amongst the other two approaches. Further, likewise other approaches, it witnesses the decrease in accuracy with increase in software complexity but the decrease is minimal.

  10. Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Smith, I.M.; Sale, M.J.

    1993-06-01

    Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.

  11. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  12. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  13. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and U S Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  14. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

    International Nuclear Information System (INIS)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date

  15. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  16. Database requirements for the Advanced Test Accelerator project

    International Nuclear Information System (INIS)

    Chambers, F.W.

    1984-01-01

    The database requirements for the Advanced Test Accelerator (ATA) project are outlined. ATA is a state-of-the-art electron accelerator capable of producing energetic (50 million electron volt), high current (10,000 ampere), short pulse (70 billionths of a second) beams of electrons for a wide variety of applications. Databasing is required for two applications. First, the description of the configuration of facility itself requires an extended database. Second, experimental data gathered from the facility must be organized and managed to insure its full utilization. The two applications are intimately related since the acquisition and analysis of experimental data requires knowledge of the system configuration. This report reviews the needs of the ATA program and current implementation, intentions, and desires. These database applications have several unique aspects which are of interest and will be highlighted. The features desired in an ultimate database system are outlined. 3 references, 5 figures

  17. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment

  18. Capital planning for operating theatres based on projecting future theatre requirements.

    Science.gov (United States)

    Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill

    2011-05-01

    During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.

  19. 42 CFR 59.5 - What requirements must be met by a family planning project?

    Science.gov (United States)

    2010-10-01

    ... requirements must be met by a family planning project? (a) Each project supported under this part must: (1... (iii) Promote continued participation in the project by persons to whom family planning services may be... services purchased for project participants will be authorized by the project director or his designee on...

  20. Functions and Requirements for Debris Removal System-Project A.2

    International Nuclear Information System (INIS)

    PRECECHTEL, D.R.

    1999-01-01

    This revision of the Functions and Requirements Document updates the approved Functions and Requirements for Debris Removal Subproject WHC-SD-SNF-FRD-009, Rev. 0. It has been revised in its entirety to reflect the current scope of work for Debris Removal as canisters and lids under the K Basin Projects work breakdown structure (WBS). In this revision the canisters and lids will be consider debris and a new set of Functions and Requirements have been developed to remove the canisters and lids from the basin

  1. Requirement Volatility, Standardization and Knowledge Integration in Software Projects: An Empirical Analysis on Outsourced IS Development Projects

    Directory of Open Access Journals (Sweden)

    Rajesri Govindaraju

    2015-08-01

    Full Text Available Information systems development (ISD projects are highly complex, with different groups of people having  to collaborate and exchange their knowledge. Considering the intensity of knowledge exchange that takes place in outsourced ISD projects, in this study a conceptual model was developed, aiming to examine the influence of four antecedents, i.e. standardization, requirement volatility, internal integration, and external integration, on two dependent variables, i.e. process performance and product performance. Data  were collected from 46 software companies in four big cities in Indonesia. The collected data were examined to verify the proposed theoretical model using the partial least square structural equation modeling (PLS-SEM technique. The results show that process performance is significantly influenced by internal integration and standardization, while product performance is  significantly influenced by external integration and  requirement volatility. This study contributes  to a better understanding of how knowledge integration can be managed in outsourced ISD projects in view of increasing their success.

  2. 45 CFR 2553.72 - What are project funding requirements?

    Science.gov (United States)

    2010-10-01

    ... local funding sources during the first three years of operations; or (2) An economic downturn, the... sources of local funding support; or (3) The unexpected discontinuation of local support from one or more... 45 Public Welfare 4 2010-10-01 2010-10-01 false What are project funding requirements? 2553.72...

  3. How to scope configuration projects and manage the knowledge they require

    DEFF Research Database (Denmark)

    Shafiee, Sara; Kristjansdottir, Katrin; Hvam, Lars

    2018-01-01

    Purpose This paper aims to explore the use of the knowledge management (KM) perspective for configuration projects. Configuration projects implement configurators as information technology systems that help companies manage the specification process of customised products. An effective method...... of retrieving and formalising knowledge for configurators is essential, because it can reduce the risk of unsuccessful implementation and the time and effort required for development. Unfortunately, no standard KM frameworks are available specifically for configuration projects. This study identifies...... the knowledge necessary for different phases of a configuration project (which knowledge, for what purpose and from what sources), examines how it is transformed during a configuration project (what KM activities and tools are used) and establishes how the knowledge can be documented for future maintenance...

  4. Functions and requirements for Project W-236B, Initial Pretreatment Module: Revision 1

    International Nuclear Information System (INIS)

    Swanson, L.M.

    1994-01-01

    Hanford Site tank waste supernatants will be pretreated to separate the low-level and high-level fractions. The low-level waste fraction, containing the bulk of the chemical constituents, must be processed into a vitrified waste product which will be disposed of onsite, in a safe, environmentally sound, and cost effective manner. The high-level waste fraction separated during supernatant pretreatment (primarily cesium) will be recombined with an additional high-level waste fraction generated from pretreatment of the tank waste sludges and solids. This combined high-level waste fraction will be immobilized as glass and disposed in a geological repository. The purpose of this document is to establish the functional requirements baseline for Project W-236B, Initial Pretreatment Module, by defining the level 5 and 6 functions and requirements for the project. A functional analysis approach has been used to break down the program functions and associated physical requirements that each function must meet. As the systems engineering process evolves, the design requirements document will replace this preliminary functions and requirements document. The design requirements document (DRD) will identify key decisions and associated uncertainties that impact the project. A revision of this document to a DRD is not expected to change the performance requirements or open issues. However, additional requirements and issues may be identified

  5. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    OpenAIRE

    Ida Ayu Ari Brahmantariguna; GAP. Candra Dharmayanti; I W. Yansen

    2016-01-01

    Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independe...

  6. Traceability and communication of requirements in digital I and C systems development - the TACO project

    International Nuclear Information System (INIS)

    Sivertsen, Terje; Fredriksen, Rune; Thunem, Atoosa P-J.

    2004-01-01

    This paper summarizes some of the issues studied in the TACO project, a current activity partially funded by Nordic nuclear safety research through the NKS-R programme (NKS-R project number NKS R2 002 1 6). For more details, the reader is referred to the two project reports already delivered by the project (see section 9). On basis of experiences in the Nordic countries, the TACO project aims at identifying the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements through the different design phases. It is expected that the project will provide important input to the development of guidelines and establishment of recommended practices related to these activities. The overall aim of the preproject, which was carried out in the second half of 2002, was to identify the main issues related to traceability and communication of requirements in digital I and C systems development. By focusing on the identification of main issues, the preproject provided a basis for prioritising further work, while at the same time providing some initial recommendations related to these issues. The establishment of a Nordic expert network within the subject was another important result of the preproject. Further work has concentrated on four central and related issues, viz.; Representation of requirements origins; Traceability techniques; Configuration management and the traceability of requirements; Identification and categorisation of system aspects and their models. (Author)

  7. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    Directory of Open Access Journals (Sweden)

    Ida Ayu Ari Brahmantariguna

    2016-07-01

    Full Text Available Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed  in three stages:first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables  and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.

  8. EIA for mining projects in the CIS

    Energy Technology Data Exchange (ETDEWEB)

    Coppin, N.J.; Wheeler, P. [Wardell Armstrong, Newcastle under Lyme (United Kingdom)

    1996-12-31

    This paper examines the Environmental Impact Assessment (EIA) requirements and procedures encountered during work on gold and coal mining projects in Kazakhstan, Uzbekistan and Mongolia. Observations on the implementation of former-Soviet inspired EIA in the Commonwealth of Independent States (CIS), and the differences with North American and European requirements and procedures are highlighted, particularly where these indicate lessons for the West. The main implications for mining companies considering or developing projects in the CIS are discussed, particularly the procedures that have to be followed for environmental permitting. 2 figs.

  9. Environmental management requirements/defensible costs project. Final report

    International Nuclear Information System (INIS)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent open-quotes Murder Board.close quotes Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters' budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management

  10. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  11. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  12. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  13. Functions and requirements document, WESF decoupling project, low-level liquid waste system

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, J.H., Fluor Daniel Hanford

    1997-02-27

    The Waste Encapsulation and Storage Facility (WESF) was constructed in 1974 to encapsulate and store cesium and strontium which were isolated at B Plant from underground storage tank waste. The WESF, Building 225-B, is attached physically to the west end of B Plant, Building 221-B, 200 East area. The WESF currently utilizes B Plant facilities for disposing liquid and solid waste streams. With the deactivation of B Plant, the WESF Decoupling Project will provide replacement systems allowing WESF to continue operations independently from B Plant. Four major systems have been identified to be replaced by the WESF Decoupling Project, including the following: Low Level Liquid Waste System, Solid Waste Handling System, Liquid Effluent Control System, and Deionized Water System.

  14. International shock-wave database project : report of the requirements workshop.

    Energy Technology Data Exchange (ETDEWEB)

    Aidun, John Bahram (Institute of Problems of chemical Physics of Russian Academy of Sciences); Lomonosov, Igor V. (Institute of Problems of chemical Physics of Russian Academy of Sciences); Levashov, Pavel R. (Joint Institute for High Temperatures of Russian Academy of Sciences)

    2012-03-01

    We report on the requirements workshop for a new project, the International Shock-Wave database (ISWdb), which was held October 31 - November 2, 2011, at GSI, Darmstadt, Germany. Participants considered the idea of this database, its structure, technical requirements, content, and principles of operation. This report presents the consensus conclusions from the workshop, key discussion points, and the goals and plan for near-term and intermediate-term development of the ISWdb. The main points of consensus from the workshop were: (1) This international database is of interest and of practical use for the shock-wave and high pressure physics communities; (2) Intermediate state information and off-Hugoniot information is important and should be included in ISWdb; (3) Other relevant high pressure and auxiliary data should be included to the database, in the future; (4) Information on the ISWdb needs to be communicated, broadly, to the research community; and (5) Operating structure will consist of an Advisory Board, subject-matter expert Moderators to vet submitted data, and the database Project Team. This brief report is intended to inform the shock-wave research community and interested funding agencies about the project, as its success, ultimately, depends on both of these groups finding sufficient value in the database to use it, contribute to it, and support it.

  15. A Requirements-Based Exploration of Open-Source Software Development Projects--Towards a Natural Language Processing Software Analysis Framework

    Science.gov (United States)

    Vlas, Radu Eduard

    2012-01-01

    Open source projects do have requirements; they are, however, mostly informal, text descriptions found in requests, forums, and other correspondence. Understanding such requirements provides insight into the nature of open source projects. Unfortunately, manual analysis of natural language requirements is time-consuming, and for large projects,…

  16. AN APPROACH TO REDUCE THE STORAGE REQUIREMENT FOR BIOMETRIC DATA IN AADHAR PROJECT

    Directory of Open Access Journals (Sweden)

    T. Sivakumar

    2013-02-01

    Full Text Available AADHAR is an Indian Government Project to provide unique identification to each Citizen of India. The objective of the project is to collect all the personal details and the biometric traits from each individual. Biometric traits such as iris, face and fingerprint are being collected for authentication. All the information will be stored in a centralized data repository. Considering about the storage requirement for the biometric data of the entire population of India, approximately 20,218 TB of storage space will be required. Since 10 fingerprint data are stored, fingerprint details will take most of the space. In this paper, the storage requirement for the biometric data in the AADHAR project is analyzed and a method is proposed to reduce the storage by cropping the original biometric image before storing. This method can reduce the storage space of the biometric data drastically. All the measurements given in this paper are approximate only.

  17. Traceability and communication of requirements in digital and I and C systems development - Project report 2003

    International Nuclear Information System (INIS)

    Sivertsen, T.; Frederiksen, R.; Thunem, A.P.J.; Holmberg, J.E.; Valkonen, J.; Ventae, O.

    2004-03-01

    The overall objective of the TACO project is to improve the knowledge on principles and best practices related to the issues concretised in the preproject. On basis of experiences in the Nordic countries, the project aims at identifying the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements through the different design phases. It is expected that the project will provide important input to the development of guidelines and establishment of recommended practices related to these activities. In the year 2003, the TACO-project concentrated on four central issues: 1) Representation of requirements origins. 2) Traceability techniques. 3) Configuration management and the traceability of requirements. 4) Identification and categorisation of system aspects and their models The work was presented at the first TACO Industrial Seminar, which took place in Stockholm on the 12th of December 2003. The seminar was hosted by SKI. (au)

  18. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  19. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  20. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  1. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  2. PI3KC2{alpha}, a class II PI3K, is required for dynamin-independent internalization pathways

    DEFF Research Database (Denmark)

    Krag, Claudia; Malmberg, Emily Kim; Salcini, Anna Elisabetta

    2010-01-01

    as fluid-phase endocytosis. Our data suggest a general role for PI3KC2a in regulating physiologically relevant dynamin-independent internalization pathways by recruiting early endosome antigen 1 (EEA1) to vesicular compartments, a step required for the intracellular trafficking of vesicles generated...... screen using a cell line expressing a diphtheria toxin receptor (DTR, officially known as HBEGF) anchored to GPI (DTR-GPI), which internalizes diphtheria toxin (DT, officially known as DTX) in a dynamin-independent manner, identified PI3KC2a, a class II phosphoinositide 3-kinase (PI3K), as a specific...... regulator of dynamin-independent DT internalization. We found that the internalization of several proteins that enter the cell through dynamin-independent pathways led to a relocalization of PI3KC2a to cargo-positive vesicles. Furthermore, downregulation of PI3KC2a impaired internalization of CD59 as well...

  3. Project W-441 cold vacuum drying facility design requirements document

    International Nuclear Information System (INIS)

    O'Neill, C.T.

    1997-01-01

    This document has been prepared and is being released for Project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility. This document sets forth the physical design criteria, Codes and Standards, and functional requirements that were used in the design of the Cold Vacuum Drying Facility. This document contains section 3, 4, 6, and 9 of the Cold Vacuum Drying Facility Design Requirements Document. The remaining sections will be issued at a later date. The purpose of the Facility is to dry, weld, and inspect the Multi-Canister Overpacks before transport to dry storage

  4. 75 FR 41875 - Technical Processing Requirements for Multifamily Project Mortgage Insurance

    Science.gov (United States)

    2010-07-19

    ... is used to determine if key principals are acceptable and have the ability to manage the development... principals are acceptable and have the ability to manage the development, construction, completion, and... Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD...

  5. Independent Orbiter Assessment (IOA): FMEA/CIL assessment

    Science.gov (United States)

    Hinsdale, L. W.; Swain, L. J.; Barnes, J. E.

    1988-01-01

    The McDonnell Douglas Astronautics Company (MDAC) was selected to perform an Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL). Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis featured a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the analysis was accomplished without reliance upon the results contained within the NASA and Prime Contractor FMEA/CIL documentation. The assessment process compared the independently derived failure modes and criticality assignments to the proposed NASA post 51-L FMEA/CIL documentation. When possible, assessment issues were discussed and resolved with the NASA subsystem managers. Unresolved issues were elevated to the Orbiter and GFE Projects Office manager, Configuration Control Board (CCB), or Program Requirements Control Board (PRCB) for further resolution. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode. The worst case effect could cause loss of crew/vehicle when the microwave landing system is not active. It is concluded that NASA and Prime Contractor Post 51-L FMEA/CIL documentation assessed by IOA is believed to be technically accurate and complete. All CIL issues were resolved. No FMEA issues remain that have safety implications. Consideration should be given, however, to upgrading NSTS 22206 with definitive ground rules which more clearly spell out the limits of redundancy.

  6. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  7. Environmental Influences on Independent Collaborative Play

    Science.gov (United States)

    Mawson, Brent

    2010-01-01

    Data from two qualitative research projects indicated a relationship between the type of early childhood setting and children's independent collaborative play. The first research project involved 22 three and four-year-old children in a daylong setting and 47 children four-year-old children in a sessional kindergarten. The second project involved…

  8. Arsenic Removal from Drinking Water by Adsorptive Media U.S. EPA Demonstration Project at Webb Consolidated Independent School District in Bruni, TX - Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project at the Webb Consolidated Independent School District (Webb CISD) in Bruni, TX. The main objective of the project was to evaluate the effect...

  9. Specific Sirt1 Activator-mediated Improvement in Glucose Homeostasis Requires Sirt1-Independent Activation of AMPK

    Directory of Open Access Journals (Sweden)

    Sung-Jun Park

    2017-04-01

    Full Text Available The specific Sirt1 activator SRT1720 increases mitochondrial function in skeletal muscle, presumably by activating Sirt1. However, Sirt1 gain of function does not increase mitochondrial function, which raises a question about the central role of Sirt1 in SRT1720 action. Moreover, it is believed that the metabolic effects of SRT1720 occur independently of AMP-activated protein kinase (AMPK, an important metabolic regulator that increases mitochondrial function. Here, we show that SRT1720 activates AMPK in a Sirt1-independent manner and SRT1720 activates AMPK by inhibiting a cAMP degrading phosphodiesterase (PDE in a competitive manner. Inhibiting the cAMP effector protein Epac prevents SRT1720 from activating AMPK or Sirt1 in myotubes. Moreover, SRT1720 does not increase mitochondrial function or improve glucose tolerance in AMPKα2 knockout mice. Interestingly, weight loss induced by SRT1720 is not sufficient to improve glucose tolerance. Therefore, contrary to current belief, the metabolic effects produced by SRT1720 require AMPK, which can be activated independently of Sirt1.

  10. Nye County nuclear waste repository project office independent scientific investigations program. Summary annual report, May 1996--April 1997

    International Nuclear Information System (INIS)

    1997-05-01

    This annual summary report, prepared by Multimedia Environmental Technology, Inc. (MET) on behalf of Nye County Nuclear Waste Project Office, summarizes the activities that were performed during the period from May 1, 1996 to April 30, 1997. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO's on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: (1) Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment. (2) Identifying areas not being addressed adequately by DOE Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues

  11. Evaluation of data requirements for computerized constructability analysis of pavement rehabilitation projects.

    Science.gov (United States)

    2013-08-01

    This research aimed to evaluate the data requirements for computer assisted construction planning : and staging methods that can be implemented in pavement rehabilitation projects in the state of : Georgia. Results showed that two main issues for the...

  12. Pyruvate carboxylase is required for glutamine-independent growth of tumor cells

    Science.gov (United States)

    Cheng, Tzuling; Sudderth, Jessica; Yang, Chendong; Mullen, Andrew R.; Jin, Eunsook S.; Matés, José M.; DeBerardinis, Ralph J.

    2011-01-01

    Tumor cells require a constant supply of macromolecular precursors, and interrupting this supply has been proposed as a therapeutic strategy in cancer. Precursors for lipids, nucleic acids, and proteins are generated in the tricarboxylic acid (TCA) cycle and removed from the mitochondria to participate in biosynthetic reactions. Refilling the pool of precursor molecules (anaplerosis) is therefore crucial to maintain cell growth. Many tumor cells use glutamine to feed anaplerosis. Here we studied how “glutamine-addicted” cells react to interruptions of glutamine metabolism. Silencing of glutaminase (GLS), which catalyzes the first step in glutamine-dependent anaplerosis, suppressed but did not eliminate the growth of glioblastoma cells in culture and in vivo. Profiling metabolic fluxes in GLS-suppressed cells revealed induction of a compensatory anaplerotic mechanism catalyzed by pyruvate carboxylase (PC), allowing the cells to use glucose-derived pyruvate rather than glutamine for anaplerosis. Although PC was dispensable when glutamine was available, forcing cells to adapt to low-glutamine conditions rendered them absolutely dependent on PC for growth. Furthermore, in other cell lines, measuring PC activity in nutrient-replete conditions predicted dependence on specific anaplerotic enzymes. Cells with high PC activity were resistant to GLS silencing and did not require glutamine for survival or growth, but displayed suppressed growth when PC was silenced. Thus, PC-mediated, glucose-dependent anaplerosis allows cells to achieve glutamine independence. Induction of PC during chronic suppression of glutamine metabolism may prove to be a mechanism of resistance to therapies targeting glutaminolysis. PMID:21555572

  13. Radiation requirements for uranium project approvals

    International Nuclear Information System (INIS)

    Hondros, J.

    2014-01-01

    Uranium mining projects in Australia must receive approval under both state and national laws based on a wide ranging impact assessment of the project. The process may take a number of years and involves multiple levels and parts of government and public consultation and scrutiny. The impact assessment is broad and usually covers; environmental, social, health, public safety and economic aspects. Information provided in the approvals documentation needs to be presented in a credible and understandable manner for all audiences. This means making complex information simpler, while making sure that it maintains its technical integrity. Poorly communicated information, which is overly complex, overly simplified or incomplete, can result in significant delays to the project approval which can potentially impact on project timelines. For uranium projects, along with other projects involving radioactive materials, such as minerals sands and rare earths, radiation and its impacts usually draw a disproportionate amount of both government and public scrutiny compared to other potential impacts and risks. It is therefore of key importance that radiation assessments are properly performed and results clearly presented and communicated with sufficient detail for stakeholders to make informed decisions. It is also important to ensure that the radiation risk is presented in perspective with other risks of the project. This presentation outlines a structure for a radiation impact assessment based on experience from a number of projects in Australia. The structure aims to be clear and simple and ensure the right balance between scientific fact, digestible information and demonstrable competence. (author)

  14. Reprocessing Close Range Terrestrial and Uav Photogrammetric Projects with the Dbat Toolbox for Independent Verification and Quality Control

    Science.gov (United States)

    Murtiyoso, A.; Grussenmeyer, P.; Börlin, N.

    2017-11-01

    Photogrammetry has recently seen a rapid increase in many applications, thanks to developments in computing power and algorithms. Furthermore with the democratisation of UAVs (Unmanned Aerial Vehicles), close range photogrammetry has seen more and more use due to the easier capability to acquire aerial close range images. In terms of photogrammetric processing, many commercial software solutions exist in the market that offer results from user-friendly environments. However, in most commercial solutions, a black-box approach to photogrammetric calculations is often used. This is understandable in light of the proprietary nature of the algorithms, but it may pose a problem if the results need to be validated in an independent manner. In this paper, the Damped Bundle Adjustment Toolbox (DBAT) developed for Matlab was used to reprocess some photogrammetric projects that were processed using the commercial software Agisoft Photoscan. Several scenarios were experimented on in order to see the performance of DBAT in reprocessing terrestrial and UAV close range photogrammetric projects in several configurations of self-calibration setting. Results show that DBAT managed to reprocess PS projects and generate metrics which can be useful for project verification.

  15. REPROCESSING CLOSE RANGE TERRESTRIAL AND UAV PHOTOGRAMMETRIC PROJECTS WITH THE DBAT TOOLBOX FOR INDEPENDENT VERIFICATION AND QUALITY CONTROL

    Directory of Open Access Journals (Sweden)

    A. Murtiyoso

    2017-11-01

    Full Text Available Photogrammetry has recently seen a rapid increase in many applications, thanks to developments in computing power and algorithms. Furthermore with the democratisation of UAVs (Unmanned Aerial Vehicles, close range photogrammetry has seen more and more use due to the easier capability to acquire aerial close range images. In terms of photogrammetric processing, many commercial software solutions exist in the market that offer results from user-friendly environments. However, in most commercial solutions, a black-box approach to photogrammetric calculations is often used. This is understandable in light of the proprietary nature of the algorithms, but it may pose a problem if the results need to be validated in an independent manner. In this paper, the Damped Bundle Adjustment Toolbox (DBAT developed for Matlab was used to reprocess some photogrammetric projects that were processed using the commercial software Agisoft Photoscan. Several scenarios were experimented on in order to see the performance of DBAT in reprocessing terrestrial and UAV close range photogrammetric projects in several configurations of self-calibration setting. Results show that DBAT managed to reprocess PS projects and generate metrics which can be useful for project verification.

  16. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  17. Designing for Change: Minimizing the Impact of Changing Requirements in the Later Stages of a Spaceflight Software Project

    Science.gov (United States)

    Allen, B. Danette

    1998-01-01

    In the traditional 'waterfall' model of the software project life cycle, the Requirements Phase ends and flows into the Design Phase, which ends and flows into the Development Phase. Unfortunately, the process rarely, if ever, works so smoothly in practice. Instead, software developers often receive new requirements, or modifications to the original requirements, well after the earlier project phases have been completed. In particular, projects with shorter than ideal schedules are highly susceptible to frequent requirements changes, as the software requirements analysis phase is often forced to begin before the overall system requirements and top-level design are complete. This results in later modifications to the software requirements, even though the software design and development phases may be complete. Requirements changes received in the later stages of a software project inevitably lead to modification of existing developed software. Presented here is a series of software design techniques that can greatly reduce the impact of last-minute requirements changes. These techniques were successfully used to add built-in flexibility to two complex software systems in which the requirements were expected to (and did) change frequently. These large, real-time systems were developed at NASA Langley Research Center (LaRC) to test and control the Lidar In-Space Technology Experiment (LITE) instrument which flew aboard the space shuttle Discovery as the primary payload on the STS-64 mission.

  18. Independent safety organization

    International Nuclear Information System (INIS)

    Kato, W.Y.; Weinstock, E.V.; Carew, J.F.; Cerbone, R.J.; Guppy, J.G.; Hall, R.E.; Taylor, J.H.

    1985-01-01

    Brookhaven National Laboratory has conducted a study on the need and feasibility of an independent organization to investigate significant safety events for the Office for Analysis and Evaluation of Operational Data, USNRC. The study consists of three parts: the need for an independent organization to investigate significant safety events, alternative organizations to conduct investigations, and legislative requirements. The determination of need was investigated by reviewing current NRC investigation practices, comparing aviation and nuclear industry practices, and interviewing a spectrum of representatives from the nuclear industry, the regulatory agency, and the public sector. The advantages and disadvantages of alternative independent organizations were studied, namely, an Office of Nuclear Safety headed by a director reporting to the Executive Director for Operations (EDO) of NRC; an Office of Nuclear Safety headed by a director reporting to the NRC Commissioners; a multi-member NTSB-type Nuclear Safety Board independent of the NRC. The costs associated with operating a Nuclear Safety Board were also included in the study. The legislative requirements, both new authority and changes to the existing NRC legislative authority, were studied. 134 references

  19. Ootw Tool Requirements in Relation to JWARS

    Energy Technology Data Exchange (ETDEWEB)

    Hartley III, D.S.; Packard, S.L.

    1998-01-01

    This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

  20. Developing Project Duration Models in Software Engineering

    Institute of Scientific and Technical Information of China (English)

    Pierre Bourque; Serge Oligny; Alain Abran; Bertrand Fournier

    2007-01-01

    Based on the empirical analysis of data contained in the International Software Benchmarking Standards Group(ISBSG) repository, this paper presents software engineering project duration models based on project effort. Duration models are built for the entire dataset and for subsets of projects developed for personal computer, mid-range and mainframeplatforms. Duration models are also constructed for projects requiring fewer than 400 person-hours of effort and for projectsre quiring more than 400 person-hours of effort. The usefulness of adding the maximum number of assigned resources as asecond independent variable to explain duration is also analyzed. The opportunity to build duration models directly fromproject functional size in function points is investigated as well.

  1. Preliminary design requirements document (DRD) for Project W-236B, ''Initial Pretreatment Module''

    International Nuclear Information System (INIS)

    Swanson, L.M.

    1995-01-01

    The scope of this Design Requirements Document (DRD) is to identify and define the functions, with associated requirements, which must be performed to separate Hanford Site tank waste supernatants into low-level and high-level fractions. This documents sets forth function requirements, performance requirements, and design constraints necessary to begin conceptual design for the Initial Pretreatment Module (IPM). System and physical interfaces between the IPM project and the Tank Waste Remediation System (TWRS) are identified. The constraints, performance requirements, and transfer of information and data across a technical interface will be documented in an Interface Control Document. Supplemental DRDs will be prepared to provide more detailed requirements specific to systems described in the DRD

  2. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  3. RGMDV: An approach to requirements gathering and the management of data virtualization projects

    Science.gov (United States)

    Mousa, Ayad Hameed; Shiratuddin, Norshuhada; Bakar, Muhamad Shahbani Abu

    2015-12-01

    Data virtualization (DV) refers to a set of data stores that enable users to query, access, and manipulate data in a unified, abstracted, and encapsulated manner regardless of data location. Apart from reducing data movement, this system provides a unified, abstracted, real-time, and encapsulated view of information for query purposes. Through its provision of live, virtual data in a timely manner, the DV technique can overcome the obstacles faced by organizations and companies as a result of using other data integration techniques. The systematic planning for the period that precedes DV deployment enables organizations to avoid many challenges related to manageability, usability, data quality, and performance. DV requirements are among the most significant and challenging aspects of a DV project. In this study, an approach has been developed to gather and manage the requirements of a DV design model as an initial step in developing such projects. Expert methods are reviewed to validate and evaluate the proposed approach in terms of usability and related components; the results of this review demonstrate that the applied approaches benefit DV development projects.

  4. Implementation of a Project-Based Telecommunications Engineering Design Course

    Science.gov (United States)

    Aliakbarian, Hadi; Soh, Ping Jack; Farsi, Saeed; Xu, Hantao; Van Lil, Emmanuel H. E. M. J. C.; Nauwelaers, Bart K. J. C.; Vandenbosch, Guy A. E.; Schreurs, Dominique M. M.-P.

    2014-01-01

    This paper describes and discusses the implementation of a project-based graduate design course in telecommunications engineering. This course, which requires a combination of technical and soft skills for its completion, enables guided independent learning (GIL) and application of technical knowledge acquired from classroom learning. Its main…

  5. 7 CFR 4280.29 - Supplemental financing required for the Ultimate Recipient Project.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Supplemental financing required for the Ultimate Recipient Project. 4280.29 Section 4280.29 Agriculture Regulations of the Department of Agriculture... AND GRANTS Rural Economic Development Loan and Grant Programs § 4280.29 Supplemental financing...

  6. GOATS Image Projection Component

    Science.gov (United States)

    Haber, Benjamin M.; Green, Joseph J.

    2011-01-01

    When doing mission analysis and design of an imaging system in orbit around the Earth, answering the fundamental question of imaging performance requires an understanding of the image products that will be produced by the imaging system. GOATS software represents a series of MATLAB functions to provide for geometric image projections. Unique features of the software include function modularity, a standard MATLAB interface, easy-to-understand first-principles-based analysis, and the ability to perform geometric image projections of framing type imaging systems. The software modules are created for maximum analysis utility, and can all be used independently for many varied analysis tasks, or used in conjunction with other orbit analysis tools.

  7. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  8. Structural requirements of research tissue banks derived from standardized project surveillance.

    Science.gov (United States)

    Herpel, E; Koleganova, N; Schreiber, B; Walter, B; Kalle, C V; Schirmacher, P

    2012-07-01

    Tissue banks constitute decisive and rate-limiting resource and technology platforms for basic and translational biomedical research, notably in the area of cancer. Thus, it is essential to plan and structure tissue banking and allocate resources according to research needs, but essential requirements are still incompletely defined. The tissue bank of the National Center of Tumor Diseases Heidelberg (NCT) was founded with the intention to provide tissues of optimal quality and to prioritize the realization of research projects. We analysed its structure and prospective project management registration as well as tracking records for all projects of the NCT tissue bank as of its start in 2005 in order to obtain information that may be relevant for tissue bank planning. All project proposals submitted to the NCT tissue bank (n = 681) were included in the study. For a detailed evaluation of provided services, only projects that were completed until July 2011 (n = 605) were analysed. For these 605 projects, NCT tissue bank provided 769 specific services. In all projects/services, we recorded project leader, type and amount of material provided, type of research (basic/translational), work load of project and project completion. Furthermore, all completed projects were tracked after 90 days according to a standard protocol to determine principal investigators' (PI) satisfaction and quality of the provided material. Until July 2011, 605 projects had been successfully completed as documented by material transfer agreement. Of the projects, 72.7 % addressed basic research, 22.3 % were translational research projects and 3 % concerned epidemiological research; 91 % (n = 546) concerned a single PI and the NTC tissue bank. For these projects, 769 specific services were provided. Of these services, 288 concerned providing formalin-fixed and paraffin-embedded (FFPE) tissue (extracts, full size sections), 126 providing fresh frozen materials (including fresh frozen

  9. Ligand-independent Thrombopoietin Mutant Receptor Requires Cell Surface Localization for Endogenous Activity*

    Science.gov (United States)

    Marty, Caroline; Chaligné, Ronan; Lacout, Catherine; Constantinescu, Stefan N.; Vainchenker, William; Villeval, Jean-Luc

    2009-01-01

    The activating W515L mutation in the thrombopoietin receptor (MPL) has been identified in primary myelofibrosis and essential thrombocythemia. MPL belongs to a subset of the cytokine receptor superfamily that requires the JAK2 kinase for signaling. We examined whether the ligand-independent MPLW515L mutant could signal intracellularly. Addition of the endoplasmic reticulum (ER) retention KDEL sequence to the receptor C terminus efficiently locked MPLW515L within its natural ER/Golgi maturation pathway. In contrast to cells expressing the parental MPLW515L, MPLW515L-KDEL-expressing FDC-P1 cells were unable to grow autonomously and to produce tumors in nude mice. When observed, tumor nodules resulted from in vivo selection of cells leaking the receptor at their surface. JAK2 co-immunoprecipitated with MPLW515L-KDEL but was not phosphorylated. We generated disulfide-bonded MPLW515L homodimers by the S402C substitution, both in the normal and KDEL context. Unlike MPLW515L-KDEL, MPLW515L-S402C-KDEL signaled constitutively and exhibited cell surface localization. These data establish that MPLW515L with appended JAK2 matures through the ER/Golgi system in an inactive conformation and suggest that the MPLW515L/JAK2 complex requires membrane localization for JAK2 phosphorylation, resulting in autonomous receptor signaling. PMID:19261614

  10. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  11. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  12. 76 FR 2684 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2011-01-14

    ... construction, not to delay shovel ready projects by requiring entities, like Lake County, to revise their... thus displace the ``shovel ready'' status for this project. Further delay of this project would...

  13. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holst, Kent (Iowa Stored Energy Plant Agency, Traer, IA); Huff, Georgianne; Schulte, Robert H. (Schulte Associates LLC, Northfield, MN); Critelli, Nicholas (Critelli Law Office PC, Des Moines, IA)

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  14. System requirements for the Los Alamos foil-implosion project

    International Nuclear Information System (INIS)

    Brownell, J.; Bowers, R.; Greene, A.; Lindemuth, I.; Nickel, G.; Oliphant, T.; Weiss, D.

    1983-01-01

    The goal of the Los Alamos imploding foil project is the development of an intense source of soft x rays and hot plasma produced from the thermalization of 1 to 10 MJ of plasma kinetic energy. The source will be used for material studies and fusion experiments. Specifically, thin, current-carrying cylindrical metallic plasmas are imploded via their self-magnetic forces. Features of this project are the use of high-explosive-driven flux-compression generators as the prime power source to achieve very high energies and fast opening switches to shorten the electrical pulses. To reach a load kinetic energy of 10 MJ, it is expected that the foil-plasma must carry about 50 MA of current and must implode in less than 1/2 μsec. This imposes the requirements that switch opening times must be less than 1/2 μsec and the transmission line must withstand voltages of about 1 MV. The system being pursued at Los Alamos is described, and model calculations are presented

  15. 76 FR 2683 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2011-01-14

    ... to delay shovel ready projects by requiring entities, like the IEUA, to revise their design and... the ``shovel ready'' status for this project. Further delay of this project would contravene the most...

  16. Traceability and communication of requirements in digital and I and C systems development - Project report 2003[TACO. Reactor safety

    Energy Technology Data Exchange (ETDEWEB)

    Sivertsen, T.; Frederiksen, R.; Thunem, A.P.J. [Institute for Energy Technology (IFE), Kjeller (Norway); Holmberg, J.E.; Valkonen, J.; Ventae, O. [VTT, Espoo (Finland)

    2004-03-01

    The overall objective of the TACO project is to improve the knowledge on principles and best practices related to the issues concretised in the preproject. On basis of experiences in the Nordic countries, the project aims at identifying the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements through the different design phases. It is expected that the project will provide important input to the development of guidelines and establishment of recommended practices related to these activities. In the year 2003, the TACO-project concentrated on four central issues: 1) Representation of requirements origins. 2) Traceability techniques. 3) Configuration management and the traceability of requirements. 4) Identification and categorisation of system aspects and their models The work was presented at the first TACO Industrial Seminar, which took place in Stockholm on the 12th of December 2003. The seminar was hosted by SKI. (au)

  17. Supplmental design requirements document enhanced radioactive and mixed waste storage: Phase 5, Project W-113

    International Nuclear Information System (INIS)

    Ocampo, V.P.

    1994-11-01

    This Supplemental Design Requirements Document (SDRD) is used to communicate Project W-113 specific plant design information from Westinghouse Hanford Company (WHC) to the United States Department of Energy (DOE) and the cognizant Architect Engineer (A/E). The SDRD is prepared after the completion of the project Conceptual Design report (CDR) and prior to the initiation of definitive design. Information in the SDRD serves two purposes: to convey design requirements that are too detailed for inclusion in the Functional Design Criteria (FDC) report and to serve as a means of change control for design commitments in the Title I and Title II design. The Solid Waste Retrieval Project (W-113) SDRD has been restructured from the equipment based outline used in previous SDRDs to a functional systems outline. This was done to facilitate identification of deficiencies in the information provided in the initial draft SDRD and aid design confirmation. The format and content of this SDRD adhere as closely as practicable to the requirements of WHC-CM-6-1, Standard Engineering Practices for Functional Design Criteria

  18. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    Science.gov (United States)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  19. 76 FR 18218 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2011-04-01

    ... delay projects that are ``shovel ready'' by requiring cities such as Salt Lake City to revise their... unreasonable delay and thus displace the ``shovel ready'' status for this project. To further delay project...

  20. Considerations for successful minority investments in independent power projects

    International Nuclear Information System (INIS)

    Bleveans, Lincoln

    1998-01-01

    This article considers the role of lead developers and lead investors, and minority investors in power projects. The risks involved in minority investment without control is examined, and minority investor issues, the 'due diligence' of the minority investor, the need for timely information, and the importance of minority investors to the power project are discussed. (UK)

  1. 12 CFR 614.4255 - Independence requirements.

    Science.gov (United States)

    2010-01-01

    ... collateral supporting a loan shall subsequently participate in any decision related to the loan purchase. ... approve a loan decision on which such person performed a collateral evaluation; or (3) As a director... required to make a credit decision. (b) Officers and employees. If the institution's internal control...

  2. The consequences of disposal of low-level radioactive waste from the Fernald Environmental Management Project: Report of the DOE/Nevada Independent Panel

    International Nuclear Information System (INIS)

    Crowe, B.; Hansen, W.; Waters, R.; Sully, M.; Levitt, D.

    1998-04-01

    The Department of Energy (DOE) convened a panel of independent scientists to assess the performance impact of shallow burial of low-level radioactive waste from the Fernald Environmental Management Project, in light of a transportation incident in December 1997 involving this waste stream. The Fernald waste has been transported to the Nevada Test Site and disposed in the Area 5 Radioactive Waste Management Site (RWMS) since 1993. A separate DOE investigation of the incident established that the waste has been buried in stress-fractured metal boxes, and some of the waste contained excess moisture (high-volumetric water contents). The Independent Panel was charged with determining whether disposition of this waste in the Area 5 RWMS has impacted the conclusions of a previously completed performance assessment in which the site was judged to meet required performance objectives. To assess the performance impact on Area 5, the panel members developed a series of questions. The three areas addressed in these questions were (1) reduced container integrity, (2) the impact of reduced container integrity on subsidence of waste in the disposal pits and (3) excess moisture in the waste. The panel has concluded that there is no performance impact from reduced container integrity--no performance is allocated to the container in the conservative assumptions used in performance assessment. Similarly, the process controlling post-closure subsidence results primarily from void space within and between containers, and the container is assumed to degrade and collapse within 100 years

  3. Projected requirements for radiation oncologists and trainees in Australia and New Zealand to 2007

    International Nuclear Information System (INIS)

    Morgan, G.; Wigg, D.; Childs, J.

    2000-01-01

    Workloads in radiation oncology facilities in Australia and New Zealand have been increasing steadily for many years and it is anticipated that this trend will continue. In the present paper the projected number of radiation oncologists required to meet this demand to the year 2007 are estimated, along with the number of trainees required. The estimates are based on data from regular surveys by the Royal Australian and New Zealand College of Radiologists (RANZCR) for the years 1988-97 (inclusive). From these surveys profiles of numbers, age and gender of specialists and trainees are documented together with increases from the training programme and losses from retirement. It is concluded that if the current trainee numbers are increased by 12 in Australia and two in New Zealand, there will be approximately 10 radiation oncologists per million of population by the year 2007. This number is considered appropriate vue the anticipated increase in demands and complexity of treatment. Because projections too far forward are unreliable, careful monitoring of progress is essential to obtain the appropriate balance between requirement and supply. Comparisons are made with other estimates of needs including the 1998 Australian Medical Workforce Advisory Committee (AMWAC) Report and the New Zealand Clinical Agency Workforce Project Report in 1997. Copyright (1999) Blackwell Science Pty Ltd

  4. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  5. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  6. Process Demonstration For Lunar In Situ Resource Utilization-Molten Oxide Electrolysis (MSFC Independent Research and Development Project No. 5-81)

    Science.gov (United States)

    Curreri, P. A.; Ethridge, E. C.; Hudson, S. B.; Miller, T. Y.; Grugel, R. N.; Sen, S.; Sadoway, D. R.

    2006-01-01

    The purpose of this Focus Area Independent Research and Development project was to conduct, at Marshall Space Flight Center, an experimental demonstration of the processing of simulated lunar resources by the molten oxide electrolysis process to produce oxygen and metal. In essence, the vision was to develop two key technologies, the first to produce materials (oxygen, metals, and silicon) from lunar resources and the second to produce energy by photocell production on the Moon using these materials. Together, these two technologies have the potential to greatly reduce the costs and risks of NASA s human exploration program. Further, it is believed that these technologies are the key first step toward harvesting abundant materials and energy independent of Earth s resources.

  7. Requirements Verification Report AN Farm to 200E Waste Transfer System for Project W-314, Tank Farm Restoration and Safe Operations

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    1999-01-01

    This Requirements Verification Report (RVR) for Project W-314 ''AN Farm to 200E Waste Transfer System'' package provides documented verification of design compliance to all the applicable Project Development Specification (PDS) requirements. Additional PDS requirements verification will be performed during the project's procurement, construction, and testing phases, and the RVR will be updated to reflect this information as appropriate

  8. 30 CFR 45.4 - Independent contractor register.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  9. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  10. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    International Nuclear Information System (INIS)

    Garrison, R.C.

    1995-01-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ''Tank Waste Remediation System (TWRS) Project Documentation Methodology,'' 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms' instrumentation, ventilation, electrical distribution, and waste transfer systems

  11. 23 CFR 636.116 - What organizational conflict of interest requirements apply to design-build projects?

    Science.gov (United States)

    2010-04-01

    ... nature of the potential conflict as seen by the owner; (iii) States the nature of the proposed restraint... 23 Highways 1 2010-04-01 2010-04-01 false What organizational conflict of interest requirements... What organizational conflict of interest requirements apply to design-build projects? (a) State...

  12. KWIKPLAN: a computer program for projecting the annual requirements of nuclear fuel cycle operations

    International Nuclear Information System (INIS)

    Salmon, R.; Kee, C.W.

    1977-06-01

    The computer code KWIKPLAN was written to facilitate the calculation of projected nuclear fuel cycle activities. Using given projections of power generation, the code calculates annual requirements for fuel fabrication, fuel reprocessing, uranium mining, and plutonium use and production. The code uses installed capacity projections and mass flow data for six types of reactors to calculate projected fuel cycle activities and inventories. It calculates fissile uranium and plutonium flows and inventories after allowing for an economy with limited reprocessing capacity and a backlog of unreprocessed fuel. All calculations are made on a quarterly basis; printed and punched output of the projected fuel cycle activities are made on an annual basis. Since the punched information is used in another code to determine waste inventories, the code punches a table from which the effective average burnup can be calculated for the fuel being reprocessed

  13. Supplemental design requirements document enhanced radioactive and mixed waste storage Phase V Project W-112

    International Nuclear Information System (INIS)

    Ocampo, V.P.; Boothe, G.F.; Greager, T.M.; Johnson, K.D.; Kooiker, S.L.; Martin, J.D.

    1994-11-01

    This document provides additional and supplemental information to WHC-SD-W112-FDC-001, Project W-112 for radioactive and mixed waste storage. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design of the Project W-112 facilities

  14. Survey on requirements for independent reviews and inspections of electrical and I and C equipment

    International Nuclear Information System (INIS)

    Byman, Karin; Groenkvist, Stefan; Egerbo, Anders; Nilsson, Thomas

    2009-03-01

    In this survey, licensing procedures for the implementation of different kinds of components and systems in nuclear power plants have been studied in four European countries: Belgium (Finland), Germany, and Switzerland. The main focus has been to describe the general features of the licensing procedures for electrical and for instrumentation and control (IandC) equipment and systems. The regulatory framework for the operation of nuclear power plants in Belgium is based on the American regulations. The licensing procedure for each modification of significance for the safety of a plant is carried out by the authorised inspection organisation (AVN), which follows its own procedures for the review of the modification file, the commissioning, and conformity check of the installation. These procedures are very general and independent of the technical domain of the equipment or system and AVN uses the US regulations standard review plan (SRP) as a reference for technical reviews. The Federal Agency for Nuclear Control (FANC) is responsible for the surveillance of all nuclear activities in Belgium, but the private non-profit authorised inspection organisation (AVN) does perform inspections and other regulatory tasks delegated by FANC. Controls of electrical components and systems with regard to the general Belgian electrical regulations are performed by accredited inspection organisations. The regulatory framework for the safety of nuclear activities in Finland is domestic and detailed safety requirements are provided by the Radiation and Nuclear Safety Authority (STUK). They cover specific requirements for the licensing procedure for electrical and IandC equipment. In Finland, there are no general differences in the licensing procedure for electrical, instrumentation, and mechanical equipment and the licensing procedure is basically the same for all types of systems, structures and equipment. STUK has the responsibility for the regulatory control in Finland and may seek

  15. Survey on requirements for independent reviews and inspections of electrical and I and C equipment

    Energy Technology Data Exchange (ETDEWEB)

    Byman, Karin; Groenkvist, Stefan; Egerbo, Anders; Nilsson, Thomas (AaF Consult AB, Stockholm (Sweden))

    2009-03-15

    In this survey, licensing procedures for the implementation of different kinds of components and systems in nuclear power plants have been studied in four European countries: Belgium (Finland), Germany, and Switzerland. The main focus has been to describe the general features of the licensing procedures for electrical and for instrumentation and control (IandC) equipment and systems. The regulatory framework for the operation of nuclear power plants in Belgium is based on the American regulations. The licensing procedure for each modification of significance for the safety of a plant is carried out by the authorised inspection organisation (AVN), which follows its own procedures for the review of the modification file, the commissioning, and conformity check of the installation. These procedures are general and independent of the technical domain of the equipment or system and AVN uses the US regulations standard review plan (SRP) as a reference for technical reviews. The Federal Agency for Nuclear Control (FANC) is responsible for the surveillance of all nuclear activities in Belgium, but the private non-profit authorised inspection organisation (AVN) does perform inspections and other regulatory tasks delegated by FANC. Controls of electrical components and systems with regard to the general Belgian electrical regulations are performed by accredited inspection organisations. The regulatory framework for the safety of nuclear activities in Finland is domestic and detailed safety requirements are provided by the Radiation and Nuclear Safety Authority (STUK). They cover specific requirements for the licensing procedure for electrical and IandC equipment. In Finland, there are no general differences in the licensing procedure for electrical, instrumentation, and mechanical equipment and the licensing procedure is basically the same for all types of systems, structures and equipment. STUK has the responsibility for the regulatory control in Finland and may seek

  16. Nye County Nuclear Waste Repository Project Office independent scientific investigations program annual report, May 1997 - April 1998

    International Nuclear Information System (INIS)

    1998-07-01

    This annual summary report, prepared by the Nye County Nuclear Waste Repository Project Office (NWRPO), summarizes the activities that were performed during the period from May 1, 1997 to April 30, 1998. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO's on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment; identifying areas not being addressed adequately by the Department of Energy (DOE). Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues. This report summarizes the results of monitoring from two boreholes and the Exploratory Studies Facility (ESF) tunnel that have been instrumented by Nye County since March and April of 1995. The preliminary data and interpretations presented in this report do not constitute and should not be considered as the official position of Nye County. The ISIP presently includes borehole and tunnel instrumentation, monitoring, data analysis, and numerical modeling activities to address the concerns of Nye County

  17. Nye County Nuclear Waste Repository Project Office independent scientific investigations program annual report, May 1997--April 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This annual summary report, prepared by the Nye County Nuclear Waste Repository Project Office (NWRPO), summarizes the activities that were performed during the period from May 1, 1997 to April 30, 1998. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO`s on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment; identifying areas not being addressed adequately by the Department of Energy (DOE). Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues. This report summarizes the results of monitoring from two boreholes and the Exploratory Studies Facility (ESF) tunnel that have been instrumented by Nye County since March and April of 1995. The preliminary data and interpretations presented in this report do not constitute and should not be considered as the official position of Nye County. The ISIP presently includes borehole and tunnel instrumentation, monitoring, data analysis, and numerical modeling activities to address the concerns of Nye County.

  18. Capability and dependency in the Newcastle 85+ cohort study. Projections of future care needs.

    Science.gov (United States)

    Jagger, Carol; Collerton, Joanna C; Davies, Karen; Kingston, Andrew; Robinson, Louise A; Eccles, Martin P; von Zglinicki, Thomas; Martin-Ruiz, Carmen; James, Oliver F W; Kirkwood, Tom B L; Bond, John

    2011-05-04

    Little is known of the capabilities of the oldest old, the fastest growing age group in the population. We aimed to estimate capability and dependency in a cohort of 85 year olds and to project future demand for care. Structured interviews at age 85 with 841 people born in 1921 and living in Newcastle and North Tyneside, UK who were permanently registered with participating general practices. Measures of capability included were self-reported activities of daily living (ADL), timed up and go test (TUG), standardised mini-mental state examination (SMMSE), and assessment of urinary continence in order to classify interval-need dependency. To project future demand for care the proportion needing 24-hour care was applied to the 2008 England and Wales population projections of those aged 80 years and over by gender. Of participants, 62% (522/841) were women, 77% (651/841) lived in standard housing, 13% (106/841) in sheltered housing and 10% (84/841) in a care home. Overall, 20% (165/841) reported no difficulty with any of the ADLs. Men were more capable in performing ADLs and more independent than women. TUG validated self-reported ADLs. When classified by 'interval of need' 41% (332/810) were independent, 39% (317/810) required help less often than daily, 12% (94/810) required help at regular times of the day and 8% (67/810) required 24-hour care. Of care-home residents, 94% (77/82) required daily help or 24-hour care. Future need for 24-hour care for people aged 80 years or over in England and Wales is projected to increase by 82% from 2010 to 2030 with a demand for 630,000 care-home places by 2030. This analysis highlights the diversity of capability and levels of dependency in this cohort. A remarkably high proportion remain independent, particularly men. However a significant proportion of this population require 24-hour care at home or in care homes. Projections for the next 20 years suggest substantial increases in the number requiring 24-hour care due to

  19. 75 FR 10258 - Notice of a Project Waiver of Section 1605: (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2010-03-05

    ... recovery by funding current infrastructure construction, not to delay shovel ready projects by requiring... would result in unreasonable delay and thus displace the ``shovel ready'' status for this project...

  20. Efficient algorithms for conditional independence inference

    Czech Academy of Sciences Publication Activity Database

    Bouckaert, R.; Hemmecke, R.; Lindner, S.; Studený, Milan

    2010-01-01

    Roč. 11, č. 1 (2010), s. 3453-3479 ISSN 1532-4435 R&D Projects: GA ČR GA201/08/0539; GA MŠk 1M0572 Institutional research plan: CEZ:AV0Z10750506 Keywords : conditional independence inference * linear programming approach Subject RIV: BA - General Mathematics Impact factor: 2.949, year: 2010 http://library.utia.cas.cz/separaty/2010/MTR/studeny-efficient algorithms for conditional independence inference.pdf

  1. Taking the Plunge: Next Steps in Engaged Learning: Project Kaleidoscope-Connecticut Conference of Independent Colleges Conference for Science Educators.

    Science.gov (United States)

    Frederick, Jennifer

    2010-09-01

    College and university science educators from across Connecticut gathered at Yale's West Campus in April 2010 for a Project Kaleidoscope (PKAL) program entitled "Taking the Plunge: Next Steps in Engaged Learning." Funded by the National Science Foundation (NSF) and co-sponsored by the Connecticut Conference of Independent Colleges (CCIC) and Yale's McDougal Graduate Teaching Center, the event was the latest in a PKAL series of one-day conferences aimed at equipping science, technology, engineering, and math (STEM) instructors with effective approaches to engaging students and training future scientists.

  2. Safeguards-by-Design: Guidance for Independent Spent Fuel Dry Storage Installations (ISFSI)

    Energy Technology Data Exchange (ETDEWEB)

    Trond Bjornard; Philip C. Durst

    2012-05-01

    This document summarizes the requirements and best practices for implementing international nuclear safeguards at independent spent fuel storage installations (ISFSIs), also known as Away-from- Reactor (AFR) storage facilities. These installations may provide wet or dry storage of spent fuel, although the safeguards guidance herein focuses on dry storage facilities. In principle, the safeguards guidance applies to both wet and dry storage. The reason for focusing on dry independent spent fuel storage installations is that this is one of the fastest growing nuclear installations worldwide. Independent spent fuel storage installations are typically outside of the safeguards nuclear material balance area (MBA) of the reactor. They may be located on the reactor site, but are generally considered by the International Atomic Energy Agency (IAEA) and the State Regulator/SSAC to be a separate facility. The need for this guidance is becoming increasingly urgent as more and more nuclear power plants move their spent fuel from resident spent fuel ponds to independent spent fuel storage installations. The safeguards requirements and best practices described herein are also relevant to the design and construction of regional independent spent fuel storage installations that nuclear power plant operators are starting to consider in the absence of a national long-term geological spent fuel repository. The following document has been prepared in support of two of the three foundational pillars for implementing Safeguards-by-Design (SBD). These are: i) defining the relevant safeguards requirements, and ii) defining the best practices for meeting the requirements. This document was prepared with the design of the latest independent dry spent fuel storage installations in mind and was prepared specifically as an aid for designers of commercial nuclear facilities to help them understand the relevant international requirements that follow from a country’s safeguards agreement with

  3. Specification of requirements to get a license for an Independent Spent Fuel Dry Storage Installation (ISFSI) at the site of the NPP-LV

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2015-09-01

    This article describes some of the work done in the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) to define specifically the requirements that the Federal Electricity Commission (CFE) shall meet to submit for consideration of CNSNS an operation request of an Independent Spent Fuel Dry Storage Installation (ISFSI). The project of a facility of this type arose from the need to provide storage capacity for spent nuclear fuel in the nuclear power plant of Laguna Verde (NPP-LV) and to continue the operation at the same facility in a safe manner. The licensing of these facilities in the United States of America has two modes: specific license or general license. The characteristics of these licenses are described in this article. However, in Mexico the existing national legislation is not designed for such license types, in fact there is a lack of standards or regulations in this regard. The regulatory law of Article 27 of the Constitution in the nuclear matter, only generally establishes that this type of facility requires an authorization from the Ministry of Energy. For this reason and because there is not a national legislation, was necessary to use the legislation that provides the Nuclear Regulatory Commission of USA, the US NRC. However, it cannot be applied as is established, so was necessary that the CNSNS analyze one by one the requirements of both types of license and determine what would be required to NPP-LV to submit its operating license of ISFSI. The American regulatory applicable to an ISFSI, the 10-Cfr-72 of the US NRC, establishes the requirements for both types of licenses. Chapter 10-Cfr was analyzed in all its clauses and coupled to the laws, regulations and standards as well as to the requirements established by CNSNS, all associated with a store spent fuel on site; the respective certification of containers for spent fuel dry storage was not included in this article, even though the CNSNS also performed that activity under the

  4. Topical and working papers on heavy water requirements and availability

    International Nuclear Information System (INIS)

    The documents included in this report are: Heavy water requirements and availability; technological infrastructure for heavy water plants; heavy water plant siting; hydrogen and methane availability; economics of heavy water production; monothermal, water fed heavy water process based on the ammonia/hydrogen isotopic exchange; production strategies to meet demand projections; hydrogen availability; deuterium sources; the independent UHDE heavy water process

  5. Bariatric surgery insurance requirements independently predict surgery dropout.

    Science.gov (United States)

    Love, Kaitlin M; Mehaffey, J Hunter; Safavian, Dana; Schirmer, Bruce; Malin, Steven K; Hallowell, Peter T; Kirby, Jennifer L

    2017-05-01

    Many insurance companies have considerable prebariatric surgery requirements despite a lack of evidence for improved clinical outcomes. The hypothesis of this study is that insurance-specific requirements will be associated with a decreased progression to surgery and increased delay in time to surgery. Retrospective data collection was performed for patients undergoing bariatric surgery evaluation from 2010-2015. Patients who underwent surgery (SGY; n = 827; mean body mass index [BMI] 49.1) were compared with those who did not (no-SGY; n = 648; mean BMI: 49.4). Univariate and multivariate analysis were performed to identify specific co-morbidity and insurance specific predictors of surgical dropout and time to surgery. A total of 1475 patients using 12 major insurance payors were included. Univariate analysis found insurance requirements associated with surgical drop out included longer median diet duration (no-SGY = 6 mo; SGY = 3 mo; Psurgery dropout. Additionally, surgical patients had an average interval between initial visit and surgery of 5.8±4.6 months with significant weight gain (2.1 kg, Psurgery insurance requirements were associated with lack of patient progression to surgery in this study. In addition, delays in surgery were associated with preoperative weight gain. Although prospective and multicenter studies are needed, these findings have major policy implications suggesting insurance requirements may need to be reconsidered to improve medical care. Copyright © 2017 American Society for Bariatric Surgery. Published by Elsevier Inc. All rights reserved.

  6. 20% Research & Design Science Project

    Science.gov (United States)

    Spear, Beth A.

    2015-04-01

    . Some students find it painful to design something independently as they are used to being told what to do. Assessing the projects, which include a wide degree of ambition established within the proposal, can be challenging. Implementation of this project requires the loss of approximately 20 % of class time. This can be a challenge when class time is already at a premium. However; the benefits of this project outweigh the loss of instructional time. This project is student centered and allows each student to pursue a topic of interest to them. This ability to choose their own topic allows students to explore with very few boundaries to confine their imagination. The project allows students to propose an ambitious project. The option for failure with the design portion of the project allows them to learn that failure is not always negative and can provide many learning opportunities, much like real world situations. This project is aligned with the NGSS encouraging creativity and innovation through unique, authentic investigations in science and technology.

  7. Design project of the dosimetry control system in the independent CO2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Vol. V

    International Nuclear Information System (INIS)

    1964-01-01

    Design project of the dosimetry control system in the independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels includes the following: calculations of CO 2 gas activity, design of the dosimetry control system, review of the changes that should be done in the RA reactor building for installing the independent CO 2 loop, specification of the materials with cost estimation, engineering drawings of the system [sr

  8. Homogenization of independent inspection criteria of Quality Assurance in the maintenance activities; Homogeneizacion de criterios en la inspeccion independiente de Garantia de Calidad a las actividades de mantenimiento

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Cardinanos, R.

    2012-07-01

    Among the official documents governing the operation of Spanish nuclear power plants is the Quality Manual and Quality Assurance. This manual gives a formal answer to the requirements of the regulations and the Nuclear Safety Council. To monitor the compliance of its requirements, the plants are controlled by independent organizations. Since 2007, in nuclear Sta. Maria de Garona is developed a project to improve the performance of the QA inspectors during maintenance activities. Results of the project have been edited data sheets on specific activities of maintenance. The project aims to incorporate sheets that help QA inspectors in their daily inspection.

  9. The trillion dollar power project jackpot

    International Nuclear Information System (INIS)

    Roseman, E.J.

    1994-01-01

    International power needs, if not insatiable, are certainly of a magnitude beyond anything heretofore imagined. The international opportunities for independent power development are huge: Power Plants -- $700 to $800 billion worth of the new facilities will be needed by the year 2000; Transmission and Distribution -- Expansion of services will require an additional $300 to $400 billion; and Repowering and Improving Existing Plants -- The estimate is $40-$60 billion. RCG/Hagler, Bailly tracks the international power project development activities of over a hundred developers, and monitors the emerging private power market in Europe, Asia, and Latin America. On behalf of private clients and multi-lateral institutions, the authors have worked in more than three dozen countries in the past two years. There are far-reaching global implications involved in this massive movement toward independent power projects. New levels of international economic growth depend on it. Far greater energy efficiencies must accompany it. Environmental problems which will arise must be recognized and solved. The results from the trillion dollars that are to be invested will be far-reaching, dramatic, and vastly beneficial

  10. Projecting future solid waste management requirements on the Hanford Site

    International Nuclear Information System (INIS)

    Shaver, S.R.; Stiles, D.L.; Holter, G.M.; Anderson, B.C.

    1990-09-01

    The problem of treating and disposing of hazardous transuranic (TRU), low-level radioactive, and mixed waste has become a major concern of the public and the government. At the US Department of Energy's Hanford Site in Washington state, the problem is compounded by the need to characterize, retrieve, and treat the solid waste that was generated and stored for retrieval during the past 20 years. This paper discusses the development and application of a Solid Waste Projection Model that uses forecast volumes and characteristics of existing and future solid waste to address the treatment, storage, and disposal requirements at Hanford. The model uses a data-driven, object-oriented approach to assess the storage and treatment throughout requirements for each operation for each of the distinct waste classes and the accompanying cost of the storage and treatment operations. By defining the elements of each alternative for the total waste management system, the same database can be used for numerous analyses performed at different levels of detail. This approach also helps a variety of users with widely varying information requirements to use the model and helps achieve the high degree of flexibility needed to cope with changing regulations and evolving treatment and disposal technologies. 2 figs

  11. 12 CFR 363.3 - Independent public accountant.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Independent public accountant. 363.3 Section... POLICY ANNUAL INDEPENDENT AUDITS AND REPORTING REQUIREMENTS § 363.3 Independent public accountant. (a... public accountant to audit and report on its annual financial statements in accordance with generally...

  12. Transcallosal Projections Require Glycoprotein M6-Dependent Neurite Growth and Guidance.

    Science.gov (United States)

    Mita, Sakura; de Monasterio-Schrader, Patricia; Fünfschilling, Ursula; Kawasaki, Takahiko; Mizuno, Hidenobu; Iwasato, Takuji; Nave, Klaus-Armin; Werner, Hauke B; Hirata, Tatsumi

    2015-11-01

    The function of mature neurons critically relies on the developmental outgrowth and projection of their cellular processes. It has long been postulated that the neuronal glycoproteins M6a and M6b are involved in axon growth because these four-transmembrane domain-proteins of the proteolipid protein family are highly enriched on growth cones, but in vivo evidence has been lacking. Here, we report that the function of M6 proteins is required for normal axonal extension and guidance in vivo. In mice lacking both M6a and M6b, a severe hypoplasia of axon tracts was manifested. Most strikingly, the corpus callosum was reduced in thickness despite normal densities of cortical projection neurons. In single neuron tracing, many axons appeared shorter and disorganized in the double-mutant cortex, and some of them were even misdirected laterally toward the subcortex. Probst bundles were not observed. Upon culturing, double-mutant cortical and cerebellar neurons displayed impaired neurite outgrowth, indicating a cell-intrinsic function of M6 proteins. A rescue experiment showed that the intracellular loop of M6a is essential for the support of neurite extension. We propose that M6 proteins are required for proper extension and guidance of callosal axons that follow one of the most complex trajectories in the mammalian nervous system. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  13. Financing clean coal projects in Eastern Europe

    International Nuclear Information System (INIS)

    Jackson, G.

    1992-01-01

    The Trade and Development Program (TDP), a U.S. Government agency, provides funding for US firms to carry out feasibility studies, consultancies, and other planning services related to major projects in developing countries. By providing assistance in project planning, TDP promotes economic development; at the same time, TDP helps US firms get involved in projects that offer significant export opportunities. TDP has programs throughout the developing world, including Central and Eastern Europe, and has recently been authorized to operate in the Newly Independent States (NIS) of the former Soviet Union. The vast size and population of this region, as well as its tremendous infrastructural and basic industrial needs, present new challenges to TDP. The basic TDP program is described below; it is likely to be modified somewhat to meet the specific requirements of the NIS

  14. Development of Occupational Safety and Health Requirement Management System (OSHREMS Software Using Adobe Dreamweaver CS5 for Building Construction Project

    Directory of Open Access Journals (Sweden)

    Abas Nor Haslinda

    2017-01-01

    Full Text Available The construction industry sector is considered as being risky with frequent and high accident rate. According to Social Security Organization (SOCSO, the construction accidents has arisen from time to time. Construction Industry Development Board (CIDB has developed the Safety and Health Assessment System in Construction (SHASSIC for evaluating the performance of a contractor in construction project by setting out the safety and health management and practices, however the requirement checklist provided is not comprehensive. Therefore, this study aims to develop a software system for facilitating OSH in building construction project, namely OSH requirements management system (OSHREMS, using Adobe Dreamweaver CS5 and Sublime Text as PHP editor. The results from a preliminary study which was conducted through interviews showed that, the respondents were only implementing the basic requirements that comply with legislations, with the absence of appropriate and specific guideline in ensuring occupational safety and health (OSH at the workplace. The tool will be benefits for contractors and other parties to effectively manage the OSH requirements for their projects based on project details.

  15. Rhetoric and Realities: What Independence of the Bar Requires of Lawyer Regulation

    Directory of Open Access Journals (Sweden)

    Alice Woolley

    2011-06-01

    Full Text Available The Canadian legal profession is largely self-regulating. Provincial law societies governed by lawyers elected by their peers set the standards for admission to the profession and for ethical conduct, and investigate, prosecute and adjudicate allegations of professional misconduct by lawyers. Advocates for this regulatory structure rely on the concept of “independence of the bar”, the idea that lawyers must be free from any external interference with their representation of clients. Critics of the regulatory structure, meanwhile, argue that independence has a broader meaning than the advocates suppose and that, in any event, the self-regulatory structure of the Canadian profession is not necessary to ensure independence. This paper presents the varying interpretations of independence of the bar and suggests that while the advocates for self-regulation have a more justifiable understanding of independence than do critics, the concept of independence of the bar is not itself central to assessing the validity of any particular regulatory scheme. Rather, the things that independence should protect – the ability of lawyers to be zealous advocates for clients within the bounds of legality – should be used to assess the adequacies of any regulatory scheme. Does regulation ensure that lawyers fulfill their duty of zealous advocacy? Does regulation ensure that lawyers remain within the bounds of legality? Does regulation ensure access to justice? With these criteria in mind, and using recent changes to the regulation of lawyers in England and Wales as a comparator, the paper then analyzes the adequacy of regulation of Canadian lawyers with respect to competence, the general structure of professional regulation and access to justice. Based on this analysis, the author proposes changes to improve lawyer regulation in Canada. These changes do not abandon self-regulation. However, they include separating the adjudicative function of the law societies

  16. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  17. Tricks of the trade: Sharing ideas about independent hydro development in Canada

    International Nuclear Information System (INIS)

    Collins, S.J.

    1992-01-01

    Preparation and patience are the keys to developing independent hydropower projects in Canada. Several individuals who have experience breaking into the business share their advice. Opportunities for independent hydro developers to contribute to electricity production in Canada are increasing, thanks to government and utility support. Site selection, costs, environmental regulations, native rights issues, project approval processes, and time lines are all important issues

  18. Robust Requirements Tracing via Internet Search Technology: Improving an IV and V Technique. Phase 2

    Science.gov (United States)

    Hayes, Jane; Dekhtyar, Alex

    2004-01-01

    There are three major objectives to this phase of the work. (1) Improvement of Information Retrieval (IR) methods for Independent Verification and Validation (IV&V) requirements tracing. Information Retrieval methods are typically developed for very large (order of millions - tens of millions and more documents) document collections and therefore, most successfully used methods somewhat sacrifice precision and recall in order to achieve efficiency. At the same time typical IR systems treat all user queries as independent of each other and assume that relevance of documents to queries is subjective for each user. The IV&V requirements tracing problem has a much smaller data set to operate on, even for large software development projects; the set of queries is predetermined by the high-level specification document and individual requirements considered as query input to IR methods are not necessarily independent from each other. Namely, knowledge about the links for one requirement may be helpful in determining the links of another requirement. Finally, while the final decision on the exact form of the traceability matrix still belongs to the IV&V analyst, his/her decisions are much less arbitrary than those of an Internet search engine user. All this suggests that the information available to us in the framework of the IV&V tracing problem can be successfully leveraged to enhance standard IR techniques, which in turn would lead to increased recall and precision. We developed several new methods during Phase II; (2) IV&V requirements tracing IR toolkit. Based on the methods developed in Phase I and their improvements developed in Phase II, we built a toolkit of IR methods for IV&V requirements tracing. The toolkit has been integrated, at the data level, with SAIC's SuperTracePlus (STP) tool; (3) Toolkit testing. We tested the methods included in the IV&V requirements tracing IR toolkit on a number of projects.

  19. A European multi-language initiative to make the general population aware of independent clinical research: the European Communication on Research Awareness Need project

    OpenAIRE

    Mosconi, Paola; Antes, Gerd; Barbareschi, Giorgio; Burls, Amanda; Demotes-Mainard, Jacques; Chalmers, Iain; Colombo, Cinzia; Garattini, Silvio; Gluud, Christian; Gyte, Gill; Mcllwain, Catherine; Penfold, Matt; Post, Nils; Satolli, Roberto; Valetto, Maria Rosa

    2016-01-01

    BACKGROUND: The ECRAN (European Communication on Research Awareness Needs) project was initiated in 2012, with support from the European Commission, to improve public knowledge about the importance of independent, multinational, clinical trials in Europe. \\ud \\ud METHODS: Participants in the ECRAN consortium included clinicians and methodologists directly involved in clinical trials; researchers working in partnership with the public and patients; representatives of patients; and experts in s...

  20. 12 CFR 1261.6 - Nominations for member and independent directorships.

    Science.gov (United States)

    2010-01-01

    ... areas: auditing and accounting, derivatives, financial management, organizational management, project... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Nominations for member and independent... § 1261.6 Nominations for member and independent directorships. (a) Election announcement. Within a...

  1. FEM-model of the Naesliden Mine: requirements and limitations at the outset of the project. [Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Krauland, N.

    1980-05-15

    The design of any instrument depends entirely on the application planned for the instrument. This applies also to the FEM-representation of the Naesliden Mine. With reference to the aims of the project the requirements on the model are outlined with regard to - simulation of the mining process - modelling with special reference to the aims of the project - comparison of FEM-results with in situ observations to determine the validity of the model. The proposed model is two-dimensional and incorporates joint elements to simulate the weak alteration zone between orebody and sidewall rock. The remainder of the model exhibits linear elastic behaviour. This model is evaluated with respect to the given requirements. The limitations of the chosen model are outlined.

  2. A U.S. developer's introduction to international independent power development

    International Nuclear Information System (INIS)

    Goodwin, L.M.

    1993-01-01

    Because US developers have had significant experience developing independent power projects in the US during the fifteen years since the Public Utility Regulatory Policies Act (''PURPA'') was passed, US developers have been some of the most aggressive participants in the early stages of international independent power development. However, US developers who attempt to transplant their US experience directly to foreign markets may be in for a rude awakening. Despite the similarities, there are significant differences between energy project development within the US and development in international markets. The purpose of this paper is to explore these differences, and to review some of the new considerations that experienced US developers will have to deal with in developing international projects

  3. The market for, and economics of, cogeneration and independent power projects in a competitive environment

    International Nuclear Information System (INIS)

    McLeese, R.

    1999-01-01

    A corporate review of Access Capital Corporation was presented. The company is a financial advisor for the development and ownership of electric power projects. The company has expertise in various technologies including gas-fired cogeneration, hydro energy, biomass, renewables and district heating. This presentation included a series of overhead viewgraphs which focused on: (1) the restructuring of Ontario's electricity market, (2) future private power requirements, (3) economics of IPP technologies, (4) pros and cons of on-site power generation, (5) rates paid for private power supply, and (6) financial restructuring of current NUG power purchase contracts. 2 tabs., 6 figs

  4. Application of Total Quality Management (TQM Requirements in Risk Management in Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Entisar K. Al-Geelawee

    2016-06-01

    Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.

  5. Mobile health systems for bipolar disorder: the relevance of non-functional requirements in MONARCA project

    DEFF Research Database (Denmark)

    Mayora, Oscar; Frost, Mads; Arnrich, Bert

    2016-01-01

    This paper presents a series of challenges for developing mobile health solutions for mental health as a result of MONARCA project three-year activities. The lessons learnt on the design, development and evaluation of a mobile health system for supporting the treatment of bipolar disorder....... The findings presented here are the result of over 3 years of activity within the MONARCA EU project. The challenges listed and detailed in this paper may be used in future research as a starting point for identifying important non-functional requirements involved in mobile health provisioning...

  6. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  7. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  8. U.S. financing for international independent power production projects: Legal and business issues

    International Nuclear Information System (INIS)

    Buehler, J.E. Jr.

    1990-01-01

    Fundamental changes are occurring in the capital and project development markets both domestically and internationally. In the United States, the capital market has undergone dramatic changes recently, characterized by clubbed debt structures, uncertain pricing spreads, and declining leverage ratios. In response, project sponsors and their investment bankers have created innovative debt and equity structures to attract investors while at the same time minimizing project risk and preserving the flexibility for the project to operate optimally. The structure of a project financing, either U.S. or international, will vary depending on (1) the differing project management/control concerns, financial goals and risk profiles of the developer, equipment and fuel suppliers, bank lenders and equity sources, (2) regulatory issues, such as compliance with the Public Utility Holding Company Act (PUHCA) in the U.S. and similar national utility legislation in the host foreign country, and (3) the tax implications of a given structure to the project owner, lender, and equity supplier. In response to these investor-specific goals and/or constraints, various forms of project structures have been developed. The focus of this paper is on legal and business issues which arise in international project finance, using U.S.project finance as a model that expresses the risk profile that U.S. financial institutions are accustomed to and overlaying the unique risks that are added to project financing which are international in nature

  9. Location Independent Professional Project: A Pilot Study

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  10. An architecture for device independent interfacing

    International Nuclear Information System (INIS)

    Pace, D.M.

    1990-01-01

    Achieving device independence for software applications is required for all but a small number of critical real time applications. Device independence is achieved by establishing protocols and building protocol interpreters for the specific devices. Data structures containing pointers to functions provide a flexible architecture for implementing protocol translation. 3 refs., 5 figs

  11. Conserved helicase domain of human RecQ4 is required for strand annealing-independent DNA unwinding

    DEFF Research Database (Denmark)

    Rossi, Marie L; Ghosh, Avik K; Kulikowicz, Tomasz

    2010-01-01

    Humans have five members of the well conserved RecQ helicase family: RecQ1, Bloom syndrome protein (BLM), Werner syndrome protein (WRN), RecQ4, and RecQ5, which are all known for their roles in maintaining genome stability. BLM, WRN, and RecQ4 are associated with premature aging and cancer...... provide the first evidence that human RecQ4's unwinding is independent of strand annealing, and that it does not require the presence of excess ssDNA. Moreover, we demonstrate that a point mutation of the conserved lysine in the Walker A motif abolished helicase activity, implying that not the N...... activities and protein partners of RecQ4 are conserved with those of the other RecQ helicases....

  12. Reference-Frame-Independent and Measurement-Device-Independent Quantum Key Distribution Using One Single Source

    Science.gov (United States)

    Li, Qian; Zhu, Changhua; Ma, Shuquan; Wei, Kejin; Pei, Changxing

    2018-04-01

    Measurement-device-independent quantum key distribution (MDI-QKD) is immune to all detector side-channel attacks. However, practical implementations of MDI-QKD, which require two-photon interferences from separated independent single-photon sources and a nontrivial reference alignment procedure, are still challenging with current technologies. Here, we propose a scheme that significantly reduces the experimental complexity of two-photon interferences and eliminates reference frame alignment by the combination of plug-and-play and reference frame independent MDI-QKD. Simulation results show that the secure communication distance can be up to 219 km in the finite-data case and the scheme has good potential for practical MDI-QKD systems.

  13. Cdk2 is required for p53-independent G2/M checkpoint control.

    Directory of Open Access Journals (Sweden)

    Jon H Chung

    2010-02-01

    Full Text Available The activation of phase-specific cyclin-dependent kinases (Cdks is associated with ordered cell cycle transitions. Among the mammalian Cdks, only Cdk1 is essential for somatic cell proliferation. Cdk1 can apparently substitute for Cdk2, Cdk4, and Cdk6, which are individually dispensable in mice. It is unclear if all functions of non-essential Cdks are fully redundant with Cdk1. Using a genetic approach, we show that Cdk2, the S-phase Cdk, uniquely controls the G(2/M checkpoint that prevents cells with damaged DNA from initiating mitosis. CDK2-nullizygous human cells exposed to ionizing radiation failed to exclude Cdk1 from the nucleus and exhibited a marked defect in G(2/M arrest that was unmasked by the disruption of P53. The DNA replication licensing protein Cdc6, which is normally stabilized by Cdk2, was physically associated with the checkpoint regulator ATR and was required for efficient ATR-Chk1-Cdc25A signaling. These findings demonstrate that Cdk2 maintains a balance of S-phase regulatory proteins and thereby coordinates subsequent p53-independent G(2/M checkpoint activation.

  14. Joint Integration Office Independent Review Committee annual report, 1985

    International Nuclear Information System (INIS)

    1986-08-01

    Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular research and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting group, under an independent charter providing objective review of program activities. This report summarizes the 12 major topics reviewed by the committee during 1985

  15. Flash Foods' Job Creation and Petroleum Independence with E85

    Energy Technology Data Exchange (ETDEWEB)

    Walk, Steve [Protec Fuel Management LLC, Boca Raton, FL (United States)

    2016-11-21

    Protec Fuel Management project objectives are to help design, build, provide, promote and supply biofuels for the greater energy independence, national security and domestic economic growth through job creations, infrastructure projects and supply chain business stimulants.

  16. 41 CFR 102-72.65 - What are the requirements for obtaining a delegation of individual repair and alteration project...

    Science.gov (United States)

    2010-07-01

    ... for other individual alteration projects when they demonstrate the ability to perform the delegated... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the requirements for obtaining a delegation of individual repair and alteration project authority from GSA? 102-72...

  17. Bure CLIS: role, operation, disposal project

    International Nuclear Information System (INIS)

    Jaquet, B.

    2011-01-01

    The Local Information and Oversight Committee (CLIS) is an independent body tasked by law to monitor studies carried out by the French National Radioactive Waste Management Agency (ANDRA) at the Bure laboratory and in the area surrounding Bure, within the framework of research on radioactive waste management and, in particular, on final disposal of such waste in deep geological formations. The role of the CLIS, whose members include representatives of the State, Parliament, local authorities, unions, associations and the medical profession, is to provide all population groups, beginning with the inhabitants of La Meuse and La Haute-Marne departments, with information regarding these studies and their results, as well as the underground repository project and the stakes involved: it is thus the chief contact for the inhabitants of the area. It also encourages discussion of a project that is subject to a long decision-making process, during which the CLIS is called upon to give its opinion at different stages. The objectives of the CLIS' actions are to provide information to as wide a public as possible (through public meetings, a regular newsletter and a web site) using its own data (appraisals and independent assessments), so that the public can effectively contribute to the debates held throughout the process, and also to be an independent player in the process, whenever its involvement is required and even when this is not specifically planned. (author)

  18. How Does Transformational Leadership Promote Innovation in Construction? The Mediating Role of Innovation Climate and the Multilevel Moderation Role of Project Requirements

    Directory of Open Access Journals (Sweden)

    Yanchun Zhang

    2018-05-01

    Full Text Available Innovation plays a critical role in the sustainable development of the construction industry. This research aims at examining transformational leadership’s role in shaping employees’ innovative behavior by analyzing the mediating effect of innovation climate and the cross-level moderating effect of innovativeness as a project requirement. To achieve this aim, a questionnaire survey was conducted with 300 construction industry professionals in China and 251 valid replies were received. Data collected by the questionnaire were analyzed using the method of hierarchical linear modeling (HLM. The results showed that transformational leaders could nurture a mutual climate for innovation to motivate employees’ innovative behaviors. In addition, innovativeness as a project requirement at the project level strengthens the indirect link amongst transformational leadership and innovative behavior via the innovation climate. Therefore, in the presence of higher innovativeness as a project requirement, transformational leadership is more prone to exert a positive influence upon an individual’s innovative behavior via the perceived innovation climate. The research findings improve understanding of the roles of leadership and innovation climate in affecting individual behavioral outcomes, and could help project managers and leaders encourage innovative ideas within project organizations.

  19. Development of functional requirements for electronic health communication: preliminary results from the ELIN project.

    Science.gov (United States)

    Christensen, Tom; Grimsmo, Anders

    2005-01-01

    User participation is important for developing a functional requirements specification for electronic communication. General practitioners and practising specialists, however, often work in small practices without the resources to develop and present their requirements. It was necessary to find a method that could engage practising doctors in order to promote their needs related to electronic communication. Qualitative research methods were used, starting a process to develop and study documents and collect data from meetings in project groups. Triangulation was used, in that the participants were organised into a panel of experts, a user group, a supplier group and an editorial committee. The panel of experts created a list of functional requirements for electronic communication in health care, consisting of 197 requirements, in addition to 67 requirements selected from an existing Norwegian standard for electronic patient records (EPRs). Elimination of paper copies sent in parallel with electronic messages, optimal workflow, a common electronic 'envelope' with directory services for units and end-users, and defined requirements for content with the possibility of decision support were the most important requirements. The results indicate that we have found a method of developing functional requirements which provides valid results both for practising doctors and for suppliers of EPR systems.

  20. 42 CFR 137.351 - Is a Self-Governance Tribe required to submit construction project progress and financial reports...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe required to submit..., DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in Establishing and Implementing Construction Project Agreements § 137.351 Is a Self-Governance Tribe required to...

  1. Radiation Requirements for Uranium Mining Projects

    International Nuclear Information System (INIS)

    Hondros, Jim

    2014-01-01

    Conclusions: • Radiation impact can be complex and confusing; • Aim to be credible and competent; • Process can be straightforward; – Baseline monitoring; – Project emissions; – Impact of emission; – Management measures. • “Tell the story” (what does it all mean)

  2. Succesful Experience of the Project "ASTROTOP" in Israel: Space-astonomy Science education in form of independent reserch projects of pupils

    Science.gov (United States)

    Pustil'Nik, Lev

    We present more then 10 year experience of educational project in Space/Astrophysics/Environment field, realized on the base of National Science- Educational Center "Blossoms of Science" of the Jordan Valley College. Our approach is based on the natural curiosity of children as driver of their self-development from the first minutes of their life and even in adult state. This approach shift center of the weight in educational process from direct lectures, sermons, explanation from teacher to children on own attempts of children to investigate problem, what is interesting for them, by themselves (individually or in group). Our approach includes four levels of the projects: "nano-projects" for children garden and basic school (up to 10-12 years), "micro-projects" for intermediate school (12-16 years), "mini-projects" for high school (16-18 years), and "macro-projects" for the best graduates high schools and students of colleges (17-22 years). These levels and projects are interconnected one with another and sometimes participants, started on the micro-projects level in intermediate school, continue their activity up to macro-projects of the graduate's diploma level. For each level we organize courses for preparation of the teachers and instructors, interested in the using of our receipts, and published books and brochures for them. The content of our activity for different levels: a) Level of kinder gardens/basic schools- special software with interactive movie -nano-projects; b) Level of intermediate school: "Days of Science" in tens schools of Israel- first contact with astronomy; c) Summer astronomy camps (4-5 of one week camps on 200-300 pupils from all country) with introduce to astronomy and with preparation of micro-projects on themes - first successful experience of research in real science fields (hundreds projects); d) ASTROTOP - one year program of preparation of short projects, with solution on the quality level of chosen astrophysical problem - mini-projects

  3. Projected irrigation requirements for upland crops using soil moisture model under climate change in South Korea

    Science.gov (United States)

    An increase in abnormal climate change patterns and unsustainable irrigation in uplands cause drought and affect agricultural water security, crop productivity, and price fluctuations. In this study, we developed a soil moisture model to project irrigation requirements (IR) for upland crops under cl...

  4. A One-Year Case Study: Understanding the Rich Potential of Project-Based Learning in a Virtual Reality Class for High School Students

    Science.gov (United States)

    Morales, Teresa M.; Bang, EunJin; Andre, Thomas

    2013-01-01

    This paper presents a qualitative case analysis of a new and unique, high school, student-directed, project-based learning (PBL), virtual reality (VR) class. In order to create projects, students learned, on an independent basis, how to program an industrial-level VR machine. A constraint was that students were required to produce at least one…

  5. 34 CFR 350.10 - What are the general requirements for Disability and Rehabilitation Research Projects?

    Science.gov (United States)

    2010-07-01

    ... more of the following types of activities, as specified in §§ 350.13-350.19: (1) Research. (2... 34 Education 2 2010-07-01 2010-07-01 false What are the general requirements for Disability and Rehabilitation Research Projects? 350.10 Section 350.10 Education Regulations of the Offices of the Department of...

  6. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  7. CH2M Hill Hanford Group, Inc., Standards and Requirements Identification Document (SRID) Requirements Management System and Requirements Specification

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    2000-01-01

    The current Tank Farm Contractor (TFC) for the U. S. Department of Energy, Office of River Protection (ORP), River Protection Project (RPP), CH2M Hill Hanford Group, Inc. (CHG), will use a computer based requirements management system. The system will serve as a tool to assist in identifying, capturing, and maintaining the Standards/Requirements Identification Document (S/RID) requirements and links to implementing procedures and other documents. By managing requirements as one integrated set, CHG will be able to carry out its mission more efficiently and effectively. CHG has chosen the Dynamic Object Oriented Requirements System (DOORS(trademark)) as the preferred computer based requirements management system. Accordingly, the S/RID program will use DOORS(trademark). DOORS(trademark) will replace the Environmental Requirements Management Interface (ERMI) system as the tool for S/RID data management. The DOORS(trademark) S/RID test project currently resides on the DOORSTM test server. The S/RID project will be migrated to the DOORS(trademark) production server. After the migration the S/RID project will be considered a production project and will no longer reside on the test server

  8. BV solutions of rate independent differential inclusions

    Czech Academy of Sciences Publication Activity Database

    Krejčí, Pavel; Recupero, V.

    2014-01-01

    Roč. 139, č. 4 (2014), s. 607-619 ISSN 0862-7959 R&D Projects: GA ČR GAP201/10/2315 Institutional support: RVO:67985840 Keywords : differential inclusion * stop operator * rate independence * convex set Subject RIV: BA - General Mathematics http://hdl.handle.net/10338.dmlcz/144138

  9. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  10. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  11. Rethinking the bathroom for adolescents with Cerebral Palsy: an exploratory pilot study addressing privacy and independence

    Directory of Open Access Journals (Sweden)

    Marie-Claire Bernatchez

    2017-11-01

    Full Text Available Caring for a child with cerebral palsy (CP at home represents a major challenge and can have a significant impact on the caregiver’s physical and psychological well-being. Caregivers and professionals often feel uncomfortable with adolescents’ emerging behaviours. Adolescents’ need for privacy requires a certain level of independence to be achieved. However, the physical environment may cause problems in achieving the required degree of privacy. The main objective of this study was to explore and identify realistic, evidence-based solutions to promote independence and privacy in the bathroom for teenagers with CP. The authors used a two-stage co-design process: the conception of the design solution, followed by validation. The results of this project demonstrate the need to combine original technical aids and environmental settings to create a safe, hygienic environment for the user. The results can guide therapists in their clinical approach to designing washing facilities that meet the hygiene and psychological needs of other adolescents, adults and seniors with mobility impairments.

  12. Crosscutting Requirements in the International Project on Innovative Reactors and Fuel Cycles (INPRO)

    International Nuclear Information System (INIS)

    Steur, Ronald; Lyubenov Yaven, Yanko; Gueorguiev, Boris; Mahadeva, Rao; Shen, Wenquan

    2002-01-01

    There are two categories of requirements: (i) user requirements that need to be met by the designers and manufacturers of innovative reactors and fuel cycles, and (ii) a wide spectrum of requirements that need to be met by countries, willing to successfully deploy innovative nuclear reactors for energy production. This part of the International Project on Innovative Reactors and Fuel Cycles will mainly deal with the second category of requirements. Both categories of requirements will vary depending on the institutional development, infrastructure availability and social attitude in any given country. Out of the need for sustainable development requirements will also more specific in the future. Over a 50-year time frame both categories of requirements will evolve with social and economic development as nuclear technology develops further. For example, the deployment of innovative reactors in countries with marginal or non-existing nuclear infrastructures would be possible only if the reactors are built, owned and operated by an international nuclear utility or if they are inherently safe and can be delivered as a 'black box - nuclear battery'. A number of issues will need to be addressed and conditions and requirements developed if this is going to become a reality. One general requirement for wider utilization of innovative nuclear power will be the public and environmental considerations, which will play a role in the decision making processes. Five main clusters of topics will be handled: - Infra-structural aspects, typology and consequences for nuclear development. - Industrial requirements for the different innovative concepts. - Institutional developments and requirements for future deployment of nuclear energy. (National as well as international) - Socio-political aspects, a.o. public acceptance and role of governments. - Sustainability: requirements following the need for sustainability Analysis will be made of the evolution of national and international

  13. [Independent ethics committees for clinical research in Argentina. An evaluation and a system to guarantee their independence].

    Science.gov (United States)

    Gonorazky, Sergio E

    2008-01-01

    The Administración Nacional de Medicamentos, Alimentos y Tecnología Médica de la República Argentina (ANMAT) requires that an independent ethics committee of sponsors and/or researchers must previously evaluate and approve all the new pharmacological research protocols carried out on human beings. However, due to the lucrative nature of the evaluation, and because the selection of the Independent Ethics Committee is carried out by the sponsors and/or researchers, the assumed autonomy of the former can be reduced to merely a relationship of "service provider-customer". The Institutional Review Board of the Mar del Plata s Community Hospital has evaluated, between 2005 and 2006, thirty three research protocols (with their corresponding information sheets for patients and informed consent forms) previously approved by a non-institutional Independent Ethics Committee. The median number of objections made by the Institutional Review Board, which prompted the previously mentioned protocols to be modified in order to be approved, was of three per protocol. In other words, the accreditation of an Independent Ethics Committee requires a system that guarantees actual independence from the sponsors and/or researchers, as well as management control mechanisms that may lead them into an eventual loss of accreditation. Several measures are proposed in order to correct the deficiencies of the present system.

  14. 77 FR 35408 - Proposed Collection; Comment Request: Process Evaluation of the Early Independence Award (EIA...

    Science.gov (United States)

    2012-06-13

    ...In compliance with the requirement of Section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, for opportunity for public comment on proposed data collection projects, the Office of Strategic Coordination (OSC), Division of Program Coordination, Planning, and Strategic Initiatives (DPCPSI), National Institutes of Health (NIH), will publish periodic summaries of proposed projects to be submitted to the Office of Management and Budget (OMB) for review and approval. Proposed Collection: Title: Process Evaluation of the Early Independence Award (EIA) Program. Type of Information Collection Request: NEW. Need and Use of Information Collection: This study will assess the EIA program operations. The primary objectives of the study are to (1) assess if the requests for applications (RFAs) are meeting the needs of applicants, (2) document the selection process, (3) document EIA program operations, (4) assess the progress being made by the Early Independence Principal Investigators, and (5) assess the support provided by the Host Institutions to the Early Independence Principal Investigators. The findings will provide valuable information concerning (1) aspects of the program that could be revised or improved, (2) progress made by the Early Independence Principal Investigators, and (3) implementation of the program at Host Institutions. Frequency of Response: On occasion. Affected Public: None. Type of Respondents: Applicants, reviewers, and awardees. The annual reporting burden is as follows: Estimated Number of Respondents: 390; Estimated Number of Responses per Respondent: 1; Average Burden Hours per Response: 4; and Estimated Total Annual Burden Hours Requested: 158. The annualized cost to respondents is estimated at: $9,774. There are no Capital Costs to report. There are no Operating or Maintenance Costs to report.

  15. AmI and deployment considerations in AAL services provision for elderly independent living: the MonAMI project.

    Science.gov (United States)

    Falcó, Jorge L; Vaquerizo, Esteban; Lain, Luis; Artigas, Jose Ignacio; Ibarz, Alejandro

    2013-07-12

    The MonAMI project aims to investigate the feasibility of the deployment of open platforms for Ambient Assisted Living (AAL) services provision based on Ambient Intelligence (AmI) and to test user acceptance and the usability of the services. Services were designed to provide support in the areas of environmental control, security, well-being and leisure. These services were installed and evaluated in a Spanish geriatric residence. The participants included elderly persons with disabilities, nursing home care givers and informal carers. The concept of the open platform proved to be satisfactory for the provision of the services in a context aware framework. Furthermore, the usability of the technology was viewed positively and the overall results indicate that this system has the potential to prolong independent living at home for elderly people with disabilities. Deployment was proven successful and awareness of open-platform AAL service delivery was raised in local communities throughout Europe.

  16. AmI and Deployment Considerations in AAL Services Provision for Elderly Independent Living: The MonAMI Project

    Directory of Open Access Journals (Sweden)

    Alejandro Ibarz

    2013-07-01

    Full Text Available The MonAMI project aims to investigate the feasibility of the deployment of open platforms for Ambient Assisted Living (AAL services provision based on Ambient Intelligence (AmI and to test user acceptance and the usability of the services. Services were designed to provide support in the areas of environmental control, security, well-being and leisure. These services were installed and evaluated in a Spanish geriatric residence. The participants included elderly persons with disabilities, nursing home care givers and informal carers. The concept of the open platform proved to be satisfactory for the provision of the services in a context aware framework. Furthermore, the usability of the technology was viewed positively and the overall results indicate that this system has the potential to prolong independent living at home for elderly people with disabilities. Deployment was proven successful and awareness of open-platform AAL service delivery was raised in local communities throughout Europe.

  17. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  18. Independent EEG sources are dipolar.

    Directory of Open Access Journals (Sweden)

    Arnaud Delorme

    Full Text Available Independent component analysis (ICA and blind source separation (BSS methods are increasingly used to separate individual brain and non-brain source signals mixed by volume conduction in electroencephalographic (EEG and other electrophysiological recordings. We compared results of decomposing thirteen 71-channel human scalp EEG datasets by 22 ICA and BSS algorithms, assessing the pairwise mutual information (PMI in scalp channel pairs, the remaining PMI in component pairs, the overall mutual information reduction (MIR effected by each decomposition, and decomposition 'dipolarity' defined as the number of component scalp maps matching the projection of a single equivalent dipole with less than a given residual variance. The least well-performing algorithm was principal component analysis (PCA; best performing were AMICA and other likelihood/mutual information based ICA methods. Though these and other commonly-used decomposition methods returned many similar components, across 18 ICA/BSS algorithms mean dipolarity varied linearly with both MIR and with PMI remaining between the resulting component time courses, a result compatible with an interpretation of many maximally independent EEG components as being volume-conducted projections of partially-synchronous local cortical field activity within single compact cortical domains. To encourage further method comparisons, the data and software used to prepare the results have been made available (http://sccn.ucsd.edu/wiki/BSSComparison.

  19. Q-Thruster Breadboard Campaign Project

    Science.gov (United States)

    White, Harold

    2014-01-01

    Dr. Harold "Sonny" White has developed the physics theory basis for utilizing the quantum vacuum to produce thrust. The engineering implementation of the theory is known as Q-thrusters. During FY13, three test campaigns were conducted that conclusively demonstrated tangible evidence of Q-thruster physics with measurable thrust bringing the TRL up from TRL 2 to early TRL 3. This project will continue with the development of the technology to a breadboard level by leveraging the most recent NASA/industry test hardware. This project will replace the manual tuning process used in the 2013 test campaign with an automated Radio Frequency (RF) Phase Lock Loop system (precursor to flight-like implementation), and will redesign the signal ports to minimize RF leakage (improves efficiency). This project will build on the 2013 test campaign using the above improvements on the test implementation to get ready for subsequent Independent Verification and Validation testing at Glenn Research Center (GRC) and Jet Propulsion Laboratory (JPL) in FY 2015. Q-thruster technology has a much higher thrust to power than current forms of electric propulsion (7x Hall thrusters), and can significantly reduce the total power required for either Solar Electric Propulsion (SEP) or Nuclear Electric Propulsion (NEP). Also, due to the high thrust and high specific impulse, Q-thruster technology will greatly relax the specific mass requirements for in-space nuclear reactor systems. Q-thrusters can reduce transit times for a power-constrained architecture.

  20. An Exploratory Study of the Effects of Project Finance on Project Risk Management : How the Distinguishing Attributes of Project Finance affects the Prevailing Risk Factor?

    OpenAIRE

    Chan, Ka Fai

    2011-01-01

    Project finance is a financing arrangement for projects, and it is characterised by the creation of a legally independent project company financed with non- or limited recourse loans. It is observed that the popularity of project finance is increasing in the recent decades, despite of the impact of Asian financial crisis. Especially in emerging markets, project finance is very common among the public-private partnership projects. It is possible that project finance yields some benefits in pro...

  1. Project quality assurance plant: Sodium storage facility, project F-031

    International Nuclear Information System (INIS)

    Shultz, J.W.; Shank, D.R.

    1994-11-01

    The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009

  2. Independent Study: The Culture of Mentored Undergraduate Research at The College of Wooster (Invited)

    Science.gov (United States)

    Pollock, M.; Judge, S.; Wiles, G. C.; Wilson, M. A.

    2013-12-01

    The foundation of a Wooster education is the Independent Study (I.S.) program. Established in 1947, the I.S. program is widely recognized as an exemplary undergraduate research experience (AAC&U; US News and World Report; College that Change Lives by Loren Pope). I.S. requires every Wooster student to complete an original research project. This presentation describes the details of the Wooster I.S. and, based on our experiences, gives strategies for a successful mentored undergraduate research program. Overall, the I.S. process resembles a graduate research project. Students typically begin their work in the spring of their junior year when they review the literature, learn techniques, and write a proposal for their Senior I.S. research. Many students conduct field and lab work over the following summer, although this is not a requirement of the program. In their senior year, students work one-on-one with faculty members and sometimes in small (~4 person) research groups to drive their projects forward with an increasing sense of independence. I.S. culminates in a written thesis and oral defense. Most of our students present their work at national meetings and many projects are published in peer-reviewed journals. The success of the I.S. program is largely the result of two key components: (1) the integration of undergraduate research into the curriculum, and (2) the focus on student mentoring. We have thoughtfully structured our courses so that, as students move toward I.S., they progress from concrete to abstract concepts, and from simple to complex skills. The College also recognizes the value of I.S by assigning it credit; Students earn a full course credit for each semester of I.S. (3 courses total) and there is some credit in the faculty teaching load for I.S. advising. Advisors are really mentors who are invested in their students' academic and scholarly success. As mentors, we emphasize collaboration, provide guidance and support, and hold students

  3. Drosophila Clock Is Required in Brain Pacemaker Neurons to Prevent Premature Locomotor Aging Independently of Its Circadian Function.

    Directory of Open Access Journals (Sweden)

    Alexandra Vaccaro

    2017-01-01

    Full Text Available Circadian clocks control many self-sustained rhythms in physiology and behavior with approximately 24-hour periodicity. In many organisms, oxidative stress and aging negatively impact the circadian system and sleep. Conversely, loss of the clock decreases resistance to oxidative stress, and may reduce lifespan and speed up brain aging and neurodegeneration. Here we examined the effects of clock disruptions on locomotor aging and longevity in Drosophila. We found that lifespan was similarly reduced in three arrhythmic mutants (ClkAR, cyc0 and tim0 and in wild-type flies under constant light, which stops the clock. In contrast, ClkAR mutants showed significantly faster age-related locomotor deficits (as monitored by startle-induced climbing than cyc0 and tim0, or than control flies under constant light. Reactive oxygen species accumulated more with age in ClkAR mutant brains, but this did not appear to contribute to the accelerated locomotor decline of the mutant. Clk, but not Cyc, inactivation by RNA interference in the pigment-dispersing factor (PDF-expressing central pacemaker neurons led to similar loss of climbing performance as ClkAR. Conversely, restoring Clk function in these cells was sufficient to rescue the ClkAR locomotor phenotype, independently of behavioral rhythmicity. Accelerated locomotor decline of the ClkAR mutant required expression of the PDF receptor and correlated to an apparent loss of dopaminergic neurons in the posterior protocerebral lateral 1 (PPL1 clusters. This neuronal loss was rescued when the ClkAR mutation was placed in an apoptosis-deficient background. Impairing dopamine synthesis in a single pair of PPL1 neurons that innervate the mushroom bodies accelerated locomotor decline in otherwise wild-type flies. Our results therefore reveal a novel circadian-independent requirement for Clk in brain circadian neurons to maintain a subset of dopaminergic cells and avoid premature locomotor aging in Drosophila.

  4. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  5. Software requirements definition Shipping Cask Analysis System (SCANS)

    International Nuclear Information System (INIS)

    Johnson, G.L.; Serbin, R.

    1985-01-01

    The US Nuclear Regulatory Commission (NRC) staff reviews the technical adequacy of applications for certification of designs of shipping casks for spent nuclear fuel. In order to confirm an acceptable design, the NRC staff may perform independent calculations. The current NRC procedure for confirming cask design analyses is laborious and tedious. Most of the work is currently done by hand or through the use of a remote computer network. The time required to certify a cask can be long. The review process may vary somewhat with the engineer doing the reviewing. Similarly, the documentation on the results of the review can also vary with the reviewer. To increase the efficiency of this certification process, LLNL was requested to design and write an integrated set of user-oriented, interactive computer programs for a personal microcomputer. The system is known as the NRC Shipping Cask Analysis System (SCANS). The computer codes and the software system supporting these codes are being developed and maintained for the NRC by LLNL. The objective of this system is generally to lessen the time and effort needed to review an application. Additionally, an objective of the system is to assure standardized methods and documentation of the confirmatory analyses used in the review of these cask designs. A software system should be designed based on NRC-defined requirements contained in a requirements document. The requirements document is a statement of a project's wants and needs as the users and implementers jointly understand them. The requirements document states the desired end products (i.e. WHAT's) of the project, not HOW the project provides them. This document describes the wants and needs for the SCANS system. 1 fig., 3 tabs

  6. Independent Peer Review of Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) Structural Analysis

    Science.gov (United States)

    Raju, Ivatury S.; Larsen, Curtis E.; Pellicciotti, Joseph W.

    2010-01-01

    Glenn Research Center Chief Engineer's Office requested an independent review of the structural analysis and modeling of the Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) to be conducted by the NASA Engineering and Safety Center (NESC). At this time, the IGA had completed its critical design review (CDR). The assessment was to be a peer review of the NEi-NASTRAN1 model of the APS Antenna, and not a peer review of the design and the analysis that had been completed by the GRC team for CDR. Thus, only a limited amount of information was provided on the structural analysis. However, the NESC team had difficulty separating analysis concerns from modeling issues. The team studied the NASTRAN model, but did not fully investigate how the model was used by the CoNNeCT Project and how the Project was interpreting the results. The team's findings, observations, and NESC recommendations are contained in this report.

  7. Device-Independent Certification of a Nonprojective Qubit Measurement

    Science.gov (United States)

    Gómez, Esteban S.; Gómez, Santiago; González, Pablo; Cañas, Gustavo; Barra, Johanna F.; Delgado, Aldo; Xavier, Guilherme B.; Cabello, Adán; Kleinmann, Matthias; Vértesi, Tamás; Lima, Gustavo

    2016-12-01

    Quantum measurements on a two-level system can have more than two independent outcomes, and in this case, the measurement cannot be projective. Measurements of this general type are essential to an operational approach to quantum theory, but so far, the nonprojective character of a measurement can only be verified experimentally by already assuming a specific quantum model of parts of the experimental setup. Here, we overcome this restriction by using a device-independent approach. In an experiment on pairs of polarization-entangled photonic qubits we violate by more than 8 standard deviations a Bell-like correlation inequality that is valid for all sets of two-outcome measurements in any dimension. We combine this with a device-independent verification that the system is best described by two qubits, which therefore constitutes the first device-independent certification of a nonprojective quantum measurement.

  8. Experience-independent development of the hamster circadian visual system.

    Directory of Open Access Journals (Sweden)

    August Kampf-Lassin

    2011-04-01

    Full Text Available Experience-dependent functional plasticity is a hallmark of the primary visual system, but it is not known if analogous mechanisms govern development of the circadian visual system. Here we investigated molecular, anatomical, and behavioral consequences of complete monocular light deprivation during extended intervals of postnatal development in Syrian hamsters. Hamsters were raised in constant darkness and opaque contact lenses were applied shortly after eye opening and prior to the introduction of a light-dark cycle. In adulthood, previously-occluded eyes were challenged with visual stimuli. Whereas image-formation and motion-detection were markedly impaired by monocular occlusion, neither entrainment to a light-dark cycle, nor phase-resetting responses to shifts in the light-dark cycle were affected by prior monocular deprivation. Cholera toxin-b subunit fluorescent tract-tracing revealed that in monocularly-deprived hamsters the density of fibers projecting from the retina to the suprachiasmatic nucleus (SCN was comparable regardless of whether such fibers originated from occluded or exposed eyes. In addition, long-term monocular deprivation did not attenuate light-induced c-Fos expression in the SCN. Thus, in contrast to the thalamocortical projections of the primary visual system, retinohypothalamic projections terminating in the SCN develop into normal adult patterns and mediate circadian responses to light largely independent of light experience during development. The data identify a categorical difference in the requirement for light input during postnatal development between circadian and non-circadian visual systems.

  9. Southwest Project: resource/institutional requirements analysis. Volume II. Technical studies

    Energy Technology Data Exchange (ETDEWEB)

    Ormsby, L. S.; Sawyer, T. G.; Brown, Dr., M. L.; Daviet, II, L. L.; Weber, E. R.; Brown, J. E.; Arlidge, J. W.; Novak, H. R.; Sanesi, Norman; Klaiman, H. C.; Spangenberg, Jr., D. T.; Groves, D. J.; Maddox, J. D.; Hayslip, R. M.; Ijams, G.; Lacy, R. G.; Montgomery, J.; Carito, J. A.; Ballance, J. W.; Bluemle, C. F.; Smith, D. N.; Wehrey, M. C.; Ladd, K. L.; Evans, Dr., S. K.; Guild, D. H.; Brodfeld, B.; Cleveland, J. A.; Hicks, K. L.; Noga, M. W.; Ross, A. M.

    1979-12-01

    The project provides information which could be used to accelerate the commercialization and market penetration of solar electric generation plants in the southwestern region of the United States. The area of concern includes Arizona, California, Colorado, Nevada, New Mexico, Utah, and sections of Oklahoma and Texas. The project evaluated the potential integration of solar electric generating facilities into the existing electric grids of the region through the year 2000. The technologies included wind energy conversion, solar thermal electric, solar photovoltaic conversion, and hybrid solar electric systems. Each of the technologies considered, except hybrid solar electric, was paired with a compatible energy storage system to improve plant performance and enhance applicability to a utility grid system. The hybrid concept utilizes a conventionally-fueled steam generator as well as a solar steam generator so it is not as dependent upon the availability of solar energy as are the other concepts. Operation of solar electric generating plants in conjunction with existing hydroelectric power facilities was also studied. The participants included 12 electric utility companies and a state power authority in the southwestern US, as well as a major consulting engineering firm. An assessment of the state-of-the-art of solar electric generating plants from an electric utility standpoint; identification of the electric utility industry's technical requirements and considerations for solar electric generating plants; estimation of the capital investment, operation, and maintenance costs for solar electric generating plants; and determination of the capital investment of conventional fossil and nuclear electric generating plants are presented. (MCW)

  10. A Systematic Mapping on Supporting Approaches for Requirements Traceability in the Context of Software Projects

    Directory of Open Access Journals (Sweden)

    MALCHER, P R.C.

    2015-12-01

    Full Text Available The Requirements Traceability is seen as a quality factor with regard to software development, being present in standards and quality models. In this context, several techniques, models, frameworks and tools have been used to support it. Thus, the purpose of this paper is to present a systematic mapping carried out in order to find in the literature approaches to support the requirements traceability in the context of software projects and make the categorization of the data found in order to demonstrate, by means of a reliable, accurate and auditable method, how this area has developed and what are the main approaches are used to implement it.

  11. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    Science.gov (United States)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  12. Safeguards and security benefits of project straight-line

    International Nuclear Information System (INIS)

    Jaeger, C.D.; Waddoups, I.G.

    1995-01-01

    As a result of a number of events the inventory of fissile materials no longer in nuclear weapons in the United States is increasing. This has led to a growing concern regarding the potential for theft and/or diversion and accountability of this material. Straight-Line is a project whose purpose is to demonstrate a site-independent system to monitor stored nuclear material (e.g. plutonium) and integrate the collection, processing and dissemination of information regarding this material. Safeguards and security (S ampersand S) goals of this project include data transfer of information on nuclear material to appropriate users to enhance S ampersand S, continuous on-line accountability, reduction of hands-on access to nuclear materials, incorporation of information security technologies, and early detection of tampering or unauthorized material movement. This paper addresses threat considerations, S ampersand S requirements, S ampersand S objectives, and issues for the Straight-Line project. S ampersand S features and benefits of this project are discussed with respect to existing item monitoring systems and/or other material tracking systems being developed

  13. Learning through a portfolio of carbon capture and storage demonstration projects

    Science.gov (United States)

    Reiner, David M.

    2016-01-01

    Carbon dioxide capture and storage (CCS) technology is considered by many to be an essential route to meet climate mitigation targets in the power and industrial sectors. Deploying CCS technologies globally will first require a portfolio of large-scale demonstration projects. These first projects should assist learning by diversity, learning by replication, de-risking the technologies and developing viable business models. From 2005 to 2009, optimism about the pace of CCS rollout led to mutually independent efforts in the European Union, North America and Australia to assemble portfolios of projects. Since 2009, only a few of these many project proposals remain viable, but the initial rationales for demonstration have not been revisited in the face of changing circumstances. Here I argue that learning is now both more difficult and more important given the slow pace of deployment. Developing a more coordinated global portfolio will facilitate learning across projects and may determine whether CCS ever emerges from the demonstration phase.

  14. Biologic consequences of Stat1-independent IFN signaling

    Science.gov (United States)

    Gil, M. Pilar; Bohn, Erwin; O'Guin, Andrew K.; Ramana, Chilakamarti V.; Levine, Beth; Stark, George R.; Virgin, Herbert W.; Schreiber, Robert D.

    2001-01-01

    Although Stat1 is required for many IFN-dependent responses, recent work has shown that IFNγ functions independently of Stat1 to affect the growth of tumor cells or immortalized fibroblasts. We now demonstrate that both IFNγ and IFNα/β regulate proliferative responses in cells of the mononuclear phagocyte lineage derived from Stat1-null mice. Using both representational difference analysis and gene arrays, we show that IFNγ exerts its Stat1-independent actions on mononuclear phagocytes by regulating the expression of many genes. This result was confirmed by monitoring changes in expression and function of the corresponding gene products. Regulation of the expression of these genes requires the IFNγ receptor and Jak1. The physiologic relevance of IFN-dependent, Stat1-independent signaling was demonstrated by monitoring antiviral responses in Stat1-null mice. Thus, the IFN receptors engage alternative Stat1-independent signaling pathways that have important physiological consequences. PMID:11390995

  15. A One-year Case Study: Understanding the Rich Potential of Project-based Learning in a Virtual Reality Class for High School Students

    Science.gov (United States)

    Morales, Teresa M.; Bang, EunJin; Andre, Thomas

    2013-10-01

    This paper presents a qualitative case analysis of a new and unique, high school, student-directed, project-based learning (PBL), virtual reality (VR) class. In order to create projects, students learned, on an independent basis, how to program an industrial-level VR machine. A constraint was that students were required to produce at least one educational application of VR. This study incorporated in-depth classroom observations, interviews with students, analyses of student projects, and surveys of parents and teachers to examine the social and learning processes in the class, and the nature of content learning represented in student projects. The results demonstrated that PBL can be effective even with minimal teacher guidance. The findings substantiate an educational approach rich with promise, for at least some students, that deserves considerable additional study to maximize its powerful potentials for independent and peer-mentored learning.

  16. Requirements for effective technology transfer for engineering and project management. The views of the recipient country and the technology supplier

    International Nuclear Information System (INIS)

    Backhaus, K.W.

    1986-04-01

    Technology transfer in the area of engineering and project management for nuclear power plant projects is considered a rather complex and sophisticated matter. Therefore only within a long-term nuclear co-operation a meaningful transfer of such a multifaceted technology can reasonably be achieved. A long-term nuclear co-operation anticipates a nuclear power plant program consisting of a few nuclear power plants of a certain type and size in order to achieve the indispensable effect ''learning by doing''. The objectives of nuclear technology transfer may be in general or in particular; absorption of a foreign nuclear technology and its adaptation to the conditions and needs of the receiver's country; built-up of industrial infrastructure for planning, construction and operation of nuclear power plants; raising of the general industrial level and achieve a spin-off effect; creation of a basis for independent development of nuclear technology. The technology transfer on one side and the construction program of nuclear power plants on the other side cannot be practiced by two parallel but separated event, however, they form one unit. Contrary to the import of industrial equipment in terms of ''black box'', by means of a nuclear technology transfer the introduction of new dependencies will be prevented. The technology transfer can remarkably be facilitated by forming a joint venture engineering company in the recipient country. The required know-how potential within a certain time period determines the intensity of the technology transfer and consequently the man power to be involved. The realization of such technology transfer is demonstrated by means of practical examples. (author). 12 figs

  17. U.S. independent operators step up exploration, development abroad

    International Nuclear Information System (INIS)

    Koen, A.D.

    1996-01-01

    This paper reviews the new trend of independent oil and gas operation expenditures in overseas development. It compares recent trends in production, production revenues, and exploration and development expenditures in both the US and non-US markets. It identifies numerous development projects going on in China, Columbia, Australia, Algeria, and others. It documents the production revenues from the overseas fields compared to the returns on US production. It also documents many of the advantages that the independents have over the major companies to obtain a competitive edge on developments in these regions. A historical perspective is also given which tracks the gradual changes of the way which independents operate

  18. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. The Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team's Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team

  19. Computer system requirements specification for 101-SY hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    McNeece, S.G.; Truitt, R.W.

    1994-01-01

    The system requirements specification for SY-101 hydrogen mitigation test project (HMTP) data acquisition and control system (DACS-1) documents the system requirements for the DACS-1 project. The purpose of the DACS is to provide data acquisition and control capabilities for the hydrogen mitigation testing of Tank SY-101. Mitigation testing uses a pump immersed in the waste, directed at varying angles and operated at different speeds and time durations. Tank and supporting instrumentation is brought into the DACS to monitor the status of the tank and to provide information on the effectiveness of the mitigation test. Instrumentation is also provided for closed loop control of the pump operation. DACS is also capable for being expanded to control and monitor other mitigation testing. The intended audience for the computer system requirements specification includes the SY-101 hydrogen mitigation test data acquisition and control system designers: analysts, programmers, instrument engineers, operators, maintainers. It is intended for the data users: tank farm operations, mitigation test engineers, the Test Review Group (TRG), data management support staff, data analysis, Hanford data stewards, and external reviewers

  20. Are Independent Probes Truly Independent?

    Science.gov (United States)

    Camp, Gino; Pecher, Diane; Schmidt, Henk G.; Zeelenberg, Rene

    2009-01-01

    The independent cue technique has been developed to test traditional interference theories against inhibition theories of forgetting. In the present study, the authors tested the critical criterion for the independence of independent cues: Studied cues not presented during test (and unrelated to test cues) should not contribute to the retrieval…

  1. Comparing BV solutions of rate independent processes

    Czech Academy of Sciences Publication Activity Database

    Krejčí, Pavel; Recupero, V.

    2014-01-01

    Roč. 21, č. 1 (2014), s. 121-146 ISSN 0944-6532 R&D Projects: GA ČR GAP201/10/2315 Institutional support: RVO:67985840 Keywords : variational inequalities * rate independence * convex sets Subject RIV: BA - General Mathematics Impact factor: 0.552, year: 2014 http://www.heldermann.de/JCA/JCA21/JCA211/jca21006.htm

  2. Final Report - Independent Confirmatory Survey Summary and Results for the Hematite Decommissioning Project, Festus, Missouri

    International Nuclear Information System (INIS)

    Bailey, E.N.

    2009-01-01

    The objectives of the confirmatory surveys were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee's procedures and survey results.

  3. Preliminary waste acceptance requirements - Konrad repository project

    International Nuclear Information System (INIS)

    Brennecke, P.W.; Warnecke, E.H.

    1991-01-01

    In Germany, the planned Konrad repository is proposed for the disposal of all types of radioactive wastes whose thermal influence upon the host rock is negligible. The Bundesamt fuer Strahlenschutz has established Preliminary Waste Acceptance Requirements (as of April 1990) for this facility. The respective requirements were developed on the basis of the results of site-specific safety assessments. They include general requirements on the waste packages to be disposed of as well as more specific requirements on the waste forms, the packaging and the radionuclide inventory per waste package. In addition, the delivery of waste packages was regulated. An outline of the structure and the elements of the Preliminary Waste Acceptance Requirements of April 1990 is given including comments on their legal status. (Author)

  4. [Definition and specification requirements for PAC-systems (picture archiving and communication system). A performance index with reference to the standard "IEEE Recommended Practice for Software Requirement Specifications"].

    Science.gov (United States)

    König, H; Klose, K J

    1999-04-01

    The formulation of requirements is necessary to control the goals of a PACS project. Furthermore, in this way, the scope of functionality necessary to support radiological working processes becomes clear. Definitions of requirements and specification are formulated independently of systems according to the IEEE standard "Recommended Practice for Software Requirements Specifications". Definitions are given in the Request for Information, specifications in the Request for Proposal. Functional and non-functional requirements are distinguished. The solutions are rated with respect to scope, appropriateness and quality of implementation. A PACS checklist was created according to the methods described above. It is published on the homepage of the "Arbeitsgemeinschaft Informationstechnologie" (AGIT) within the "Deutsche Röntgengesellschaft" (DRG) (http://www.uni-marburg.de/mzr/agit). The checklist provides a discussion forum which should contribute to an agreement on accepted basic PACS functionalities.

  5. A linear-algebraic tool for conditional independence inference

    Czech Academy of Sciences Publication Activity Database

    Tanaka, K.; Studený, Milan; Takemura, A.; Sei, T.

    2015-01-01

    Roč. 6, č. 2 (2015), s. 150-167 ISSN 1309-3452 R&D Projects: GA ČR GA13-20012S Institutional support: RVO:67985556 Keywords : Conditional independence inference * Automated theorem proving Subject RIV: BA - General Mathematics http://library.utia.cas.cz/separaty/2015/MTR/studeny-0450036.pdf

  6. T-cell-independent immune responses do not require CXC ligand 13-mediated B1 cell migration.

    Science.gov (United States)

    Colombo, Matthew J; Sun, Guizhi; Alugupalli, Kishore R

    2010-09-01

    The dynamic movement of B cells increases the probability of encountering specific antigen and facilitates cell-cell interactions required for mounting a rapid antibody response. B1a and B1b cells are enriched in the coelomic cavity, contribute to T-cell-independent (TI) antibody responses, and increase in number upon antigen exposure. B1 cell movement is largely governed by Cxc ligand 13 (Cxcl13), and mice deficient in this chemokine have a severe reduction in peritoneal B1 cells. In this study, we examined the role of Cxcl13-dependent B cell migration using Borrelia hermsii infection or intraperitoneal immunization with pneumococcal polysaccharide or 4-hydroxy-3-nitrophenyl-acetyl (NP)-Ficoll, all of which induce robust antibody responses from B1b cells. Surprisingly, we found that antibody responses to B. hermsii or to FhbA, an antigenic target of B1b cells, and the resolution of bacteremia were indistinguishable between wild-type and Cxcl13-/- mice. Importantly, we did not observe an expansion of peritoneal B1b cell numbers in Cxcl13-/- mice. Nonetheless, mice that had resolved infection were resistant to reinfection, indicating that the peritoneal B1b cell reservoir is not required for controlling B. hermsii. Furthermore, despite a reduced peritoneal B1b compartment, immunization with pneumococcal polysaccharide vaccine yielded comparable antigen-specific antibody responses in wild-type and Cxcl13-/- mice and conferred protection against Streptococcus pneumoniae. Likewise, immunization with NP-Ficoll elicited similar antibody responses in wild-type and Cxcl13-/- mice. These data demonstrate that homing of B1 cells into the coelomic cavity is not a requirement for generating protective TI antibody responses, even when antigen is initially localized to this anatomical compartment.

  7. Existence of Projective Planes

    OpenAIRE

    Perrott, Xander

    2016-01-01

    This report gives an overview of the history of finite projective planes and their properties before going on to outline the proof that no projective plane of order 10 exists. The report also investigates the search carried out by MacWilliams, Sloane and Thompson in 1970 [12] and confirms their result by providing independent verification that there is no vector of weight 15 in the code generated by the projective plane of order 10.

  8. NUMO-RMS: a practical requirements management system for the long-term management of the deep geological disposal project - 16304

    International Nuclear Information System (INIS)

    Ueda, Hiroyoshi; Suzuki, Satoru; Ishiguro, Katsuhiko; Oyamada, Kiyoshi; Yashio, Shoko; White, Matt; Wilmot, Roger

    2009-01-01

    NUMO (Nuclear Waste Management Organization of Japan) has the responsibility for implementing deep geological disposal of high-level (HLW) and transuranic (TRU) radioactive waste from the Japanese nuclear programme. A formal Requirements Management System (RMS) is planned to efficiently and effectively support the computerised implementation of the management strategy and the methodology required to drive the step-wise siting processes, and the following repository operational phase,. The RMS will help in the comprehensive management of the decision-making processes in the geological disposal project, in change management as the disposal system is optimised, in driving projects such as the R and D programme efficiently, and in maintaining structured records regarding past decisions, all of which lead to soundness of the project in terms of long-term continuity. The system is planned to have information handling and management functions using a database that includes the decisions/requirements in the programme under consideration, the way in which these are structured in terms of the decision-making process and other associated information. A two-year development programme is underway to develop and enhance an existing trial RMS to a practical system. Functions for change management, history management and association with the external timeline management system are being implemented in the system development work. The database format is being improved to accommodate the requirements management data relating to the facility design and to safety assessment of the deep geological repository. This paper will present an outline of the development work with examples to demonstrate the system's practicality. In parallel with the system/database developments, a case research of the use of requirements management in radioactive waste disposal projects was undertaken to identify key issues in the development of an RMS for radioactive waste disposal and specify a number of

  9. Halo-Independent Direct Detection Analyses Without Mass Assumptions

    CERN Document Server

    Anderson, Adam J.; Kahn, Yonatan; McCullough, Matthew

    2015-10-06

    Results from direct detection experiments are typically interpreted by employing an assumption about the dark matter velocity distribution, with results presented in the $m_\\chi-\\sigma_n$ plane. Recently methods which are independent of the DM halo velocity distribution have been developed which present results in the $v_{min}-\\tilde{g}$ plane, but these in turn require an assumption on the dark matter mass. Here we present an extension of these halo-independent methods for dark matter direct detection which does not require a fiducial choice of the dark matter mass. With a change of variables from $v_{min}$ to nuclear recoil momentum ($p_R$), the full halo-independent content of an experimental result for any dark matter mass can be condensed into a single plot as a function of a new halo integral variable, which we call $\\tilde{h}(p_R)$. The entire family of conventional halo-independent $\\tilde{g}(v_{min})$ plots for all DM masses are directly found from the single $\\tilde{h}(p_R)$ plot through a simple re...

  10. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  11. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  12. International exploration by independents

    International Nuclear Information System (INIS)

    Bertagne, R.G.

    1991-01-01

    Recent industry trends indicate that the smaller US independents are looking at foreign exploration opportunities as one of the alternatives for growth in the new age of exploration. It is usually accepted that foreign finding costs per barrel are substantially lower than domestic because of the large reserve potential of international plays. To get involved overseas requires, however, an adaptation to different cultural, financial, legal, operational, and political conditions. Generally foreign exploration proceeds at a slower pace than domestic because concessions are granted by the government, or are explored in partnership with the national oil company. First, a mid- to long-term strategy, tailored to the goals and the financial capabilities of the company, must be prepared; it must be followed by an ongoing evaluation of quality prospects in various sedimentary basins, and a careful planning and conduct of the operations. To successfully explore overseas also requires the presence on the team of a minimum number of explorationists and engineers thoroughly familiar with the various exploratory and operational aspects of foreign work, having had a considerable amount of onsite experience in various geographical and climatic environments. Independents that are best suited for foreign expansion are those that have been financially successful domestically, and have a good discovery track record. When properly approached foreign exploration is well within the reach of smaller US independents and presents essentially no greater risk than domestic exploration; the reward, however, can be much larger and can catapult the company into the big leagues

  13. International exploration by independent

    International Nuclear Information System (INIS)

    Bertragne, R.G.

    1992-01-01

    Recent industry trends indicate that the smaller U.S. independents are looking at foreign exploration opportunities as one of the alternatives for growth in the new age of exploration. Foreign finding costs per barrel usually are accepted to be substantially lower than domestic costs because of the large reserve potential of international plays. To get involved in overseas exploration, however, requires the explorationist to adapt to different cultural, financial, legal, operational, and political conditions. Generally, foreign exploration proceeds at a slower pace than domestic exploration because concessions are granted by a country's government, or are explored in partnership with a national oil company. First, the explorationist must prepare a mid- to long-term strategy, tailored to the goals and the financial capabilities of the company; next, is an ongoing evaluation of quality prospects in various sedimentary basins, and careful planning and conduct of the operations. To successfully explore overseas also requires the presence of a minimum number of explorationists and engineers thoroughly familiar with the various exploratory and operational aspects of foreign work. Ideally, these team members will have had a considerable amount of on-site experience in various countries and climates. Independents best suited for foreign expansion are those who have been financially successful in domestic exploration. When properly approached, foreign exploration is well within the reach of smaller U.S. independents, and presents essentially no greater risk than domestic exploration; however, the reward can be much larger and can catapult the company into the 'big leagues.'

  14. Independent Technical (open-quotes Red Teamclose quotes) Reviews

    International Nuclear Information System (INIS)

    Thullen, P.; Bennett, D.R.; Kosiewicz, S.T.; Weaver, D.L.

    1995-01-01

    Offices under the Assistant Secretary for Environmental Restoration and Waste Management (EM) in the Department of Energy (DOE) and some National Laboratories are using Independent Technical or open-quotes Red Teamclose quotes Reviews to understand and improve the performance of major projects, major system acquisitions, programs and organizations. A core group formed in 1991 by Los Alamos National Laboratory and Sandia National Laboratories, has organized teams of commercial and private consultants to perform over fifteen Independent Technical Reviews (ITRs) throughout the DOE Complex. This paper discusses: review initiation, team formation, methodology, site response, and observations gathered over the past three years

  15. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  16. Systems analysis-independent analysis and verification

    Energy Technology Data Exchange (ETDEWEB)

    Badin, J.S.; DiPietro, J.P. [Energetics, Inc., Columbia, MD (United States)

    1995-09-01

    The DOE Hydrogen Program is supporting research, development, and demonstration activities to overcome the barriers to the integration of hydrogen into the Nation`s energy infrastructure. Much work is required to gain acceptance of hydrogen energy system concepts and to develop them for implementation. A systems analysis database has been created that includes a formal documentation of technology characterization profiles and cost and performance information. Through a systematic and quantitative approach, system developers can understand and address important issues and thereby assure effective and timely commercial implementation. This project builds upon and expands the previously developed and tested pathway model and provides the basis for a consistent and objective analysis of all hydrogen energy concepts considered by the DOE Hydrogen Program Manager. This project can greatly accelerate the development of a system by minimizing the risk of costly design evolutions, and by stimulating discussions, feedback, and coordination of key players and allows them to assess the analysis, evaluate the trade-offs, and to address any emerging problem areas. Specific analytical studies will result in the validation of the competitive feasibility of the proposed system and identify system development needs. Systems that are investigated include hydrogen bromine electrolysis, municipal solid waste gasification, electro-farming (biomass gasifier and PEM fuel cell), wind/hydrogen hybrid system for remote sites, home electrolysis and alternate infrastructure options, renewable-based electrolysis to fuel PEM fuel cell vehicle fleet, and geothermal energy used to produce hydrogen. These systems are compared to conventional and benchmark technologies. Interim results and findings are presented. Independent analyses emphasize quality, integrity, objectivity, a long-term perspective, corporate memory, and the merging of technical, economic, operational, and programmatic expertise.

  17. Independent verification in operations at nuclear power plants

    International Nuclear Information System (INIS)

    Donderi, D.C.; Smiley, A.; Ostry, D.J.; Moray, N.P.

    1995-09-01

    A critical review of approaches to independent verification in operations used in nuclear power plant quality assurance programs in other countries, was conducted for this study. This report identifies the uses of independent verification and provides an assessment of the effectiveness of the various approaches. The findings indicate that at Canadian nuclear power plants as much, if not more, independent verification is performed than at power plants in the other countries included in the study. Additional requirements in this area are not proposed for Canadian stations. (author)

  18. Advanced nuclear reactor public opinion project

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  19. Advanced nuclear reactor public opinion project

    International Nuclear Information System (INIS)

    Benson, B.

    1991-01-01

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions

  20. Autonomy, Independence, Inclusion

    Directory of Open Access Journals (Sweden)

    Filippo Angelucci

    2015-04-01

    Full Text Available The living environment must not only meet the primary needs of living, but also the expectations of improvement of life and social relations and people’s work. The need for a living environment that responds to the needs of users with their different abilities, outside of standardizations, is increasingly felt as autonomy, independence and well-being are the result of real usability and adaptability of the spaces. The project to improve the inclusivity of living space and to promote the rehabilitation of fragile users need to be characterized as an interdisciplinary process in which the integration of specialized contributions leads to adaptive customization of space solutions and technological that evolve with the changing needs, functional capacities and abilities of individuals.

  1. 38 CFR 21.146 - Independent instructor course.

    Science.gov (United States)

    2010-07-01

    .... Chapter 31 Special Rehabilitation Services § 21.146 Independent instructor course. (a) Definition. An... the customary channels leading to employment may not be readily available to a veteran requiring an...

  2. Divorced women at retirement: projections of economic well-being in the near future.

    Science.gov (United States)

    Butrica, B A; Iams, H M

    2000-01-01

    The Modeling Income in the Near Term (MINT) data system projects retirement income for persons retiring in the 1990s through 2020. Using those data, we examine the economic well-being of divorced women at retirement. The MINT data system improves upon previous estimates of Social Security benefits by: Measuring and projecting years of marriage to determine if the 10-year requirement has been met, Projecting lifetime earnings until retirement and eligibility for Social Security retirement benefits, and Estimating lifetime earnings of former spouses. MINT also makes independent projections of each retiree's income from pensions, assets, and earnings (for working beneficiaries). As a result of changes in marital patterns, MINT projects that the proportion of women who are divorced will increase. At the same time, the proportion of those women who are eligible for auxiliary benefits is projected to decrease, for two main reasons. First, changes in women's earnings and work patterns result in more women receiving retired-worker benefits based on their own earnings. Second, an increased number of divorced women will not meet the 10-year marriage requirement for auxiliary benefits. Despite the projected decrease over time in eligibility rates for auxiliary benefits, the level of Social Security benefits is projected to change little between the older and younger birth cohorts of divorced women entering retirement. According to the MINT data, the most vulnerable of divorced women will be those who have not met the 10-year marriage requirement. Poverty rates will be higher for them than for all other divorced women. This group of divorced women is projected to grow as more and more women divorce from shorter marriages. With more women divorcing and with fewer divorced women meeting the 10-year marriage requirement, the proportion of economically vulnerable aged women will increase when the baby boom retires. Further research is warranted on this long neglected subject

  3. A New Concept for Androgen Receptor-Independent Growth of Prostate Cancer

    National Research Council Canada - National Science Library

    Hu, Guo-fu; Kishikawa, Hiroko; Yoshioka, Norie

    2006-01-01

    Angiogenin is an angiogenic ribonuclease that is upregulated in prostate cancer. The objective of this project is to explore the role angiogenin plays in the development of androgen-independent disease...

  4. 76 FR 37353 - Federal Acquisition Regulation; Information Collection; Certification of Independent Price...

    Science.gov (United States)

    2011-06-27

    ...; Information Collection; Certification of Independent Price Determination and Parent Company and Identifying... requirement concerning certification of independent price determination and parent company and identifying... laws, offerors on Government contracts must complete the certificate of independent price determination...

  5. Informal Learning on "YouTube": Exploring Digital Literacy in Independent Online Learning

    Science.gov (United States)

    Tan, Elaine

    2013-01-01

    The focus of this paper is a project conducted in 2011, exploring the use of "YouTube" in the classroom. The project conducted a number of focus groups for which highlighted a number of issues surrounding independent informal learning environments. The questions posed by this research are concerned with what constitutes learning in these…

  6. Requirements management at Westinghouse Electric Company

    International Nuclear Information System (INIS)

    Gustavsson, Henrik

    2014-01-01

    Field studies and surveys made in various industry branches support the Westinghouse opinion that qualitative systems engineering and requirements management have a high value in the development of complex systems and products. Two key issues causing overspending and schedule delays in projects are underestimation of complexity and misunderstandings between the different sub-project teams. These issues often arise when a project jumps too early into detail design. Good requirements management practice before detail design helps the project teams avoid such issues. Westinghouse therefore puts great effort into requirements management. The requirements management methodology at Westinghouse rests primarily on four key cornerstones: 1 - Iterative team work when developing requirements specifications, 2 - Id number tags on requirements, 3 - Robust change routine, and 4 - Requirements Traceability Matrix. (authors)

  7. 76 FR 16735 - Federal Acquisition Regulation; Information Collection; Certification of Independent Price...

    Science.gov (United States)

    2011-03-25

    ...; Information Collection; Certification of Independent Price Determination and Parent Company and Identifying... requirement concerning certification of independent price determination and parent company and identifying... violating such laws, offerors on Government contracts must complete the certificate of independent price...

  8. Independent Study Workbooks for Proofs in Group Theory

    Science.gov (United States)

    Alcock, Lara; Brown, Gavin; Dunning, Clare

    2015-01-01

    This paper describes a small-scale research project based on workbooks designed to support independent study of proofs in a first course on abstract algebra. We discuss the lecturers' aims in designing the workbooks, and set these against a background of research on students' learning of group theory and on epistemological beliefs and study habits…

  9. 75 FR 10866 - Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Science.gov (United States)

    2010-03-09

    ...) with respect to certain water quality treatment and monitoring equipment that will be used in a project... Act (Buy American provision) with respect to certain water quality treatment and monitoring equipment... temperatures for culture of June sucker. The recirculation system requires water treatment and water quality...

  10. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  11. On the joint entropy of d-wise-independent variables

    Czech Academy of Sciences Publication Activity Database

    Gavinsky, Dmitry; Pudlák, Pavel

    2016-01-01

    Roč. 57, č. 3 (2016), s. 333-343 ISSN 0010-2628 R&D Projects: GA ČR GBP202/12/G061 Institutional support: RVO:67985840 Keywords : d-wise-independent variables * entropy * lower bound Subject RIV: BA - General Mathematics http://hdl.handle.net/10338.dmlcz/145838

  12. On conditional independence and log-convexity

    Czech Academy of Sciences Publication Activity Database

    Matúš, František

    2012-01-01

    Roč. 48, č. 4 (2012), s. 1137-1147 ISSN 0246-0203 R&D Projects: GA AV ČR IAA100750603; GA ČR GA201/08/0539 Institutional support: RVO:67985556 Keywords : Conditional independence * Markov properties * factorizable distributions * graphical Markov models * log-convexity * Gibbs- Markov equivalence * Markov fields * Gaussian distributions * positive definite matrices * covariance selection model Subject RIV: BA - General Mathematics Impact factor: 0.933, year: 2012 http://library.utia.cas.cz/separaty/2013/MTR/matus-0386229.pdf

  13. Qualification of organizations for independent technical supervision

    International Nuclear Information System (INIS)

    1981-04-01

    The requirements are established on trial for the qualification of an organization as an independent technical supervision organization in nuclear facilities, in activities related with quality assurance programs. (I.C.R.) [pt

  14. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  15. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  16. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  17. Roles for Agent Assistants in Field Science: Understanding Personal Projects and Collaboration

    Science.gov (United States)

    Clancey, William J.

    2003-01-01

    A human-centered approach to computer systems design involves reframing analysis in terms of the people interacting with each other. The primary concern is not how people can interact with computers, but how shall we design work systems (facilities, tools, roles, and procedures) to help people pursue their personal projects, as they work independently and collaboratively? Two case studies provide empirical requirements. First, an analysis of astronaut interactions with CapCom on Earth during one traverse of Apollo 17 shows what kind of information was conveyed and what might be automated today. A variety of agent and robotic technologies are proposed that deal with recurrent problems in communication and coordination during the analyzed traverse. Second, an analysis of biologists and a geologist working at Haughton Crater in the High Canadian Arctic reveals how work interactions between people involve independent personal projects, sensitively coordinated for mutual benefit. In both cases, an agent or robotic system's role would be to assist people, rather than collaborating, because today's computer systems lack the identity and purpose that consciousness provides.

  18. The tail wags the dog: managing large telescope construction projects with lagging requirements and creeping scope

    Science.gov (United States)

    Warner, Mark

    2014-08-01

    In a perfect world, large telescopes would be developed and built in logical, sequential order. First, scientific requirements would be agreed upon, vetted, and fully developed. From these, instrument designers would define their own subsystem requirements and specifications, and then flesh out preliminary designs. This in turn would then allow optic designers to specify lens and mirror requirements, which would permit telescope mounts and drives to be designed. Finally, software and safety systems, enclosures and domes, buildings, foundations, and infrastructures would be specified and developed. Unfortunately, the order of most large telescope projects is the opposite of this sequence. We don't live in a perfect world. Scientists usually don't want to commit to operational requirements until late in the design process, instrument designers frequently change and update their designs due to improving filter and camera technologies, and mount and optics engineers seem to live by the words "more" and "better" throughout their own design processes. Amplifying this is the fact that site construction of buildings and domes are usually the earliest critical path items on the schedule, and are often subject to lengthy permitting and environmental processes. These facility and support items therefore must quickly get underway, often before operational requirements are fully considered. Mirrors and mounts also have very long lead times for fabrication, which in turn necessitates that they are specified and purchased early. All of these factors can result in expensive and time-consuming change orders when requirements are finalized and/or shift late in the process. This paper discusses some of these issues encountered on large, multi-year construction projects. It also presents some techniques and ideas to minimize these effects on schedule and cost. Included is a discussion on the role of Interface Control Documents (ICDs), the importance (and danger) of making big

  19. SNF project's MCO compliance assessment with DOE ''general design criteria,'' order 6430.1A and ''SNF project MCO additional NRC requirements,'' HNF-SD-SNF-DB-005

    International Nuclear Information System (INIS)

    GOLDMANN, L.H.

    1999-01-01

    This document is presented to demonstrate the MCOs compliance to the major design criteria invoked on the MCO. This document is broken down into a section for the MCO's evaluation against DOE Order 6430.1A General Design Criteria sixteen divisions and then the evaluation of the MCO against HNF-SD-SNF-DB-005 ''Spent Nuclear Fuel Project Multi-Canister Overpack Additional NRC Requirements.'' The compliance assessment is presented as a matrix in tabular form. The MCO is the primary container for the K-basin's spent nuclear fuel as it leaves the basin pools and through to the 40 year interim storage at the Canister Storage Building (CSB). The MCO and its components interface with; the K basins, shipping cask and transportation system, Cold Vacuum Drying facility individual process bays and equipment, and CSB facility including the MCO handling machine (MHM), the storage tubes, and the MCO work stations where sampling, welding, and inspection of the MCO is performed. As the MCO is the primary boundary for handling, process, and storage, its main goals are to minimize the spread of its radiological contents to the outside of the MCO and provide for nuclear criticality control. The MCO contains personnel radiation shielding only on its upper end, in the form of a shield plug, where the process interfaces are located. Shielding beyond the shield plug is the responsibility of the using facilities. The design of the MCO and its components is depicted in drawings H-2-828040 through H-2-828075. Not every drawing number in the sequence is used. The first drawing number, H-2-828040, is the drawing index for the MCO. The design performance specification for the MCO is HW-S-0426, and was reviewed and approved by the interfacing design authorities, the safety, regulatory, and operations groups, and the local DOE office. The current revision for the design performance specification is revision 5. The designs of the MCO have been reviewed and approved in a similar way and the reports

  20. The evolution of the project management

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2009-12-01

    Full Text Available Project management has appeared and developed based on scientific management theory during the '50s-'60s of the last century. After the 1990s of the last century, we can say that project management has truly become an independent discipline, which has a huge impact on the success or failure of companies which are engaged in major projects.

  1. Assessing data quality for a federal environmental restoration project: Rationalizing the requirements of multiple clients

    International Nuclear Information System (INIS)

    Kiszka, V.R.; Carlsen, T.M.

    1994-07-01

    Most environmental restoration projects at federal facilities face the difficult task of melding the quality assurance (QA) requirements of multiple clients, as well as dealing with historical data that are often of unknown quality. At Lawrence Livermore National Laboratory (LLNL), we have successfully integrated the requirements of our multiple clients by carefully developing a QA program that efficiently meets our clients' needs. The Site 300 Experimental Test Site is operated by LLNL in support of its national defense program. The responsibility for conducting environmental contaminant investigations and restoration at Site 300 is vested in the Site 300 Environmental Restoration Project (Site 300 ERP) of LLNL's Environmental Restoration Division. LLNL Site 300 ERP must comply with the QA requirements of several clients, which include: the LLNL Environmental Protection Department, the DOE, the US Environmental Protection Agency-Region IX (EPA), the California Regional Water Quality Control Board -- Central Valley Region, and the California Department of Toxic Substances Control. This comprehensive QA program was used to determine the acceptability of historical data. The Site 300 ERP began soil and ground water investigations in 1982. However, we did not begin receiving analytical quality assurance/quality control (QA/QC) data until 1989; therefore, the pre-1989 data that were collected are of unknown quality. The US EPA QAMS-005/80 defines data quality as the totality of features and characteristics of data that bears on its ability to satisfy a given purpose. In the current context, the characteristics of major importance are accuracy, precision, completeness, representativeness, and comparability. Using our established QA program, we determined the quality of this historical data based on its comparability to the post-1989 data. By accepting this historical data, we were able to save a considerable amount of money in recharacterization costs

  2. Independent CO2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Task 2.50.05

    International Nuclear Information System (INIS)

    Stojic, M.; Pavicevic, M.

    1964-01-01

    This report contains the following volumes V and VI of the Project 'Independent CO 2 loop for cooling the samples irradiated in RA reactor vertical experimental channels': Design project of the dosimetry control system in the independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, and Safety report for the Independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels [sr

  3. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  4. Development of independent walking in toddlers

    NARCIS (Netherlands)

    Ivanenko, Yuri P; Dominici, Nadia; Lacquaniti, Francesco

    Surprisingly, despite millions of years of bipedal walking evolution, the gravity-related pendulum mechanism of walking does not seem to be implemented at the onset of independent walking, requiring each toddler to develop it. We discuss the precursor of the mature locomotor pattern in infants as an

  5. Socially assistive robots : a comprehensive approach to extending independent living

    NARCIS (Netherlands)

    Johnson, D.O.; Cuijpers, R.H.; Juola, J.F.; Torta, E.; Simonov, M.; Frisiello, A.; Bazzani, M.; Yan, W.; Weber, C.; Wermter, S.; Meins, N.; Oberzaucher, J.; Panek, P. (Paul); Edelmayer, G.; Mayer, P.; Beck, C.

    2014-01-01

    Demographic developments have challenged our research on how to assist elderly people by using robots. The KSERA (Knowledgeable SErvice Robots for Aging) project integrates smart home technology and a socially-assistive robot to extend independent living for elderly people, in particular those with

  6. Metrology requirements for the serial production of ELT primary mirror segments

    Science.gov (United States)

    Rees, Paul C. T.; Gray, Caroline

    2015-08-01

    The manufacture of the next generation of large astronomical telescopes, the extremely large telescopes (ELT), requires the rapid manufacture of greater than 500 1.44m hexagonal segments for the primary mirror of each telescope. Both leading projects, the Thirty Meter Telescope (TMT) and the European Extremely Large Telescope (E-ELT), have set highly demanding technical requirements for each fabricated segment. These technical requirements, when combined with the anticipated construction schedule for each telescope, suggest that more than one optical fabricator will be involved in the delivery of the primary mirror segments in order to meet the project schedule. For one supplier, the technical specification is challenging and requires highly consistent control of metrology in close coordination with the polishing technologies used in order to optimize production rates. For production using multiple suppliers, however the supply chain is structured, consistent control of metrology along the supply chain will be required. This requires a broader pattern of independent verification than is the case of a single supplier. This paper outlines the metrology requirements for a single supplier throughout all stages of the fabrication process. We identify and outline those areas where metrology accuracy and duration have a significant impact on production efficiency. We use the challenging ESO E-ELT technical specification as an example of our treatment, including actual process data. We further develop this model for the case of a supply chain consisting of multiple suppliers. Here, we emphasize the need to control metrology throughout the supply chain in order to optimize net production efficiency.

  7. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  8. Independent events in elementary probability theory

    Science.gov (United States)

    Csenki, Attila

    2011-07-01

    In Probability and Statistics taught to mathematicians as a first introduction or to a non-mathematical audience, joint independence of events is introduced by requiring that the multiplication rule is satisfied. The following statement is usually tacitly assumed to hold (and, at best, intuitively motivated): quote specific-use="indent"> If the n events E 1, E 2, … , E n are jointly independent then any two events A and B built in finitely many steps from two disjoint subsets of E 1, E 2, … , E n are also independent. The operations 'union', 'intersection' and 'complementation' are permitted only when forming the events A and B. quote>Here we examine this statement from the point of view of elementary probability theory. The approach described here is accessible also to users of probability theory and is believed to be novel.

  9. Reducing sodium across the board: a pilot program in Schenectady County independent restaurants.

    Science.gov (United States)

    Schuldt, June; Levings, Jessica Lee; Kahn-Marshall, Jennifer; Hunt, Glynnis; Mugavero, Kristy; Gunn, Janelle Peralez

    2014-01-01

    Excess sodium intake can lead to increased blood pressure. Restaurant foods contribute nearly a quarter of the sodium consumed in the American diet. The objective of the pilot project was to develop and implement in collaboration with independent restaurants a tool, the Restaurant Assessment Tool and Evaluation (RATE), to assess efforts to reduce sodium in independent restaurants and measure changes over time in food preparation categories, including menu, cooking techniques, and products. Twelve independent restaurants in Schenectady County, New York, voluntarily participated. From initial assessment to a 6-month follow-up assessment using the RATE, 11 restaurants showed improvement in the cooking category, 9 showed improvement in the menu category, and 7 showed improvement in the product category. Menu analysis conducted by the Schenectady County Health Department staff suggested that reported sodium-reduction strategies might have affected approximately 25% of the restaurant menu items. The findings from this project suggest that a facilitated assessment, such as the RATE, can provide a useful platform for independent restaurant owners and public health practitioners to discuss and encourage sodium reduction. The RATE also provides opportunities to build and strengthen relationships between public health care practitioners and independent restaurant owners, which may help sustain the positive changes made.

  10. Are Independent Fiscal Institutions Really Independent?

    Directory of Open Access Journals (Sweden)

    Slawomir Franek

    2015-08-01

    Full Text Available In the last decade the number of independent fiscal institutions (known also as fiscal councils has tripled. They play an important oversight role over fiscal policy-making in democratic societies, especially as they seek to restore public finance stability in the wake of the recent financial crisis. Although common functions of such institutions include a role in analysis of fiscal policy, forecasting, monitoring compliance with fiscal rules or costing of spending proposals, their roles, resources and structures vary considerably across countries. The aim of the article is to determine the degree of independence of such institutions based on the analysis of the independence index of independent fiscal institutions. The analysis of this index values may be useful to determine the relations between the degree of independence of fiscal councils and fiscal performance of particular countries. The data used to calculate the index values will be derived from European Commission and IMF, which collect sets of information about characteristics of activity of fiscal councils.

  11. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  12. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  13. Projections of energy requirements and their implications

    International Nuclear Information System (INIS)

    Hogroian, P.

    1978-01-01

    The subject is covered in sections, entitled as shown. Numerical data are indicated in parenthesis. The record of nuclear power forecasting (estimates of the growth of world nuclear power, penetration of the electric power market by nuclear power); brief review of energy forecasting techniques and problems; some views of future world energy demand (estimates of world primary energy requirements); possible allocations of energy resources to needs (allocation of resources (oil, oil from tar sands, shale, natural gas, coal, coal to gasification, hydroelectricity, renewable resources, nuclear) to the world's primary energy needs in the year 2000); observations on the adequacy of energy resources; implications for nuclear energy (postulated growth of world nuclear power, annual fuel cycle requirements of the world, annual uranium requirements of the world). (U.K.)

  14. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  15. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  16. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  17. Software use cases to elicit the software requirements analysis within the ASTRI project

    Science.gov (United States)

    Conforti, Vito; Antolini, Elisa; Bonnoli, Giacomo; Bruno, Pietro; Bulgarelli, Andrea; Capalbi, Milvia; Fioretti, Valentina; Fugazza, Dino; Gardiol, Daniele; Grillo, Alessandro; Leto, Giuseppe; Lombardi, Saverio; Lucarelli, Fabrizio; Maccarone, Maria Concetta; Malaguti, Giuseppe; Pareschi, Giovanni; Russo, Federico; Sangiorgi, Pierluca; Schwarz, Joseph; Scuderi, Salvatore; Tanci, Claudio; Tosti, Gino; Trifoglio, Massimo; Vercellone, Stefano; Zanmar Sanchez, Ricardo

    2016-07-01

    The Italian National Institute for Astrophysics (INAF) is leading the Astrofisica con Specchi a Tecnologia Replicante Italiana (ASTRI) project whose main purpose is the realization of small size telescopes (SST) for the Cherenkov Telescope Array (CTA). The first goal of the ASTRI project has been the development and operation of an innovative end-to-end telescope prototype using a dual-mirror optical configuration (SST-2M) equipped with a camera based on silicon photo-multipliers and very fast read-out electronics. The ASTRI SST-2M prototype has been installed in Italy at the INAF "M.G. Fracastoro" Astronomical Station located at Serra La Nave, on Mount Etna, Sicily. This prototype will be used to test several mechanical, optical, control hardware and software solutions which will be used in the ASTRI mini-array, comprising nine telescopes proposed to be placed at the CTA southern site. The ASTRI mini-array is a collaborative and international effort led by INAF and carried out by Italy, Brazil and South-Africa. We present here the use cases, through UML (Unified Modeling Language) diagrams and text details, that describe the functional requirements of the software that will manage the ASTRI SST-2M prototype, and the lessons learned thanks to these activities. We intend to adopt the same approach for the Mini Array Software System that will manage the ASTRI miniarray operations. Use cases are of importance for the whole software life cycle; in particular they provide valuable support to the validation and verification activities. Following the iterative development approach, which breaks down the software development into smaller chunks, we have analysed the requirements, developed, and then tested the code in repeated cycles. The use case technique allowed us to formalize the problem through user stories that describe how the user procedurally interacts with the software system. Through the use cases we improved the communication among team members, fostered

  18. The Development of Independent Travel in China in the Future and Travel Agents’ Coping Strategies

    OpenAIRE

    Pan, Yulu

    2010-01-01

    Abstract The purpose of this research is to understand the general trend of independent travel in China from tourists’ perspectives and what strategies travel agents should adopt to cope with the increased independent travel. This project is based on both primary research and secondary research. Quantitative and qualitative data are collected and analyzed for deeply exploration about independent travel in order to understand tourists’ attitudes, expectations and perspectives. By this w...

  19. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  20. The ATLAS Open Data project

    CERN Document Server

    Doglioni, Caterina; The ATLAS collaboration; Sanchez Pineda, Arturo Rodolfo

    2018-01-01

    The ATLAS Open Data project is a collection of high-level LHC collision data and tools to be used for education, training, outreach and citizen science. These resources are meant to be platform-independent, and are available on the web and on digital supports, such as USB drives. The project includes a Community hub where users can interact and actively participate in discussions.

  1. Independent Events in Elementary Probability Theory

    Science.gov (United States)

    Csenki, Attila

    2011-01-01

    In Probability and Statistics taught to mathematicians as a first introduction or to a non-mathematical audience, joint independence of events is introduced by requiring that the multiplication rule is satisfied. The following statement is usually tacitly assumed to hold (and, at best, intuitively motivated): If the n events E[subscript 1],…

  2. Reflections on independence in nurse practitioner practice.

    Science.gov (United States)

    Weiland, Sandra A

    2008-07-01

    To examine factors that influence the ability of nurse practitioners (NPs) to practice as independent primary care providers. Extensive literature search on CINAHL, OVID, MEDLINE, Internet journal sources, and professional association Web sites. The legal authority for NPs to practice independently is recognized; however, the ability to put that authority into practice is undermined by the historical failure of political, professional, and social entities to recognize NPs as providers capable of providing primary care autonomously. Nonrecognition is responsible for complex reimbursement policies (both federal and state) that economically and professionally restrain the NP role; hence, NPs remain in a financially dependent relationship despite 40 years of proven safe practice. NPs must articulate their independence as practitioners more vociferously in order to meet society's healthcare requirements, as well as to attain professional fulfillment and forge collegial relationships. NPs will never be seen as members of a profession by either themselves or others without the practicality of independence and autonomy. Although legal independence is a fact, real practice independence in the pragmatic sense is contingent upon reimbursement. Without fiscal sustainability, practice independence is an impossibility. And, without professional autonomy, NPs will have only an employee's voice in the dynamic healthcare system in which they are really key players in providing healthcare services to the poor and undeserved populations.

  3. Logistics Reduction and Repurposing Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The project enables a largely mission-independent, cradle-to-grave-to-cradle approach to minimize logistics contributions to total mission architecture mass. The...

  4. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  5. Independent Verification Survey of the Clean Coral Storage Pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project

    International Nuclear Information System (INIS)

    Wilson-Nichols, M.J.; Egidi, P.V.; Roemer, E.K.; Schlosser, R.M.

    2000-01-01

    f I The Oak Ridge National Laboratory (ORNL) Environmental Technology Section conducted an independent verification (IV) survey of the clean storage pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project (JAPCSRP) from January 18-25, 1999. The goal of the JAPCSRP is to restore a 24-acre area that was contaminated with plutonium oxide particles during nuclear testing in the 1960s. The selected remedy was a soil sorting operation that combined radiological measurements and mining processes to identify and sequester plutonium-contaminated soil. The soil sorter operated from about 1990 to 1998. The remaining clean soil is stored on-site for planned beneficial use on Johnston Island. The clean storage pile currently consists of approximately 120,000 m3 of coral. ORNL conducted the survey according to a Sampling and Analysis Plan, which proposed to provide an IV of the clean pile by collecting a minimum number (99) of samples. The goal was to ascertain wi th 95% confidence whether 97% of the processed soil is less than or equal to the accepted guideline (500-Bq/kg or 13.5-pCi/g) total transuranic (TRU) activity

  6. Halo-independent direct detection analyses without mass assumptions

    International Nuclear Information System (INIS)

    Anderson, Adam J.; Fox, Patrick J.; Kahn, Yonatan; McCullough, Matthew

    2015-01-01

    Results from direct detection experiments are typically interpreted by employing an assumption about the dark matter velocity distribution, with results presented in the m χ −σ n plane. Recently methods which are independent of the DM halo velocity distribution have been developed which present results in the v min −g-tilde plane, but these in turn require an assumption on the dark matter mass. Here we present an extension of these halo-independent methods for dark matter direct detection which does not require a fiducial choice of the dark matter mass. With a change of variables from v min to nuclear recoil momentum (p R ), the full halo-independent content of an experimental result for any dark matter mass can be condensed into a single plot as a function of a new halo integral variable, which we call h-til-tilde(p R ). The entire family of conventional halo-independent g-tilde(v min ) plots for all DM masses are directly found from the single h-tilde(p R ) plot through a simple rescaling of axes. By considering results in h-tilde(p R ) space, one can determine if two experiments are inconsistent for all masses and all physically possible halos, or for what range of dark matter masses the results are inconsistent for all halos, without the necessity of multiple g-tilde(v min ) plots for different DM masses. We conduct a sample analysis comparing the CDMS II Si events to the null results from LUX, XENON10, and SuperCDMS using our method and discuss how the results can be strengthened by imposing the physically reasonable requirement of a finite halo escape velocity

  7. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  8. Biologic consequences of Stat1-independent IFN signaling

    OpenAIRE

    Gil, M. Pilar; Bohn, Erwin; O'Guin, Andrew K.; Ramana, Chilakamarti V.; Levine, Beth; Stark, George R.; Virgin, Herbert W.; Schreiber, Robert D.

    2001-01-01

    Although Stat1 is required for many IFN-dependent responses, recent work has shown that IFNγ functions independently of Stat1 to affect the growth of tumor cells or immortalized fibroblasts. We now demonstrate that both IFNγ and IFNα/β regulate proliferative responses in cells of the mononuclear phagocyte lineage derived from Stat1-null mice. Using both representational difference analysis and gene arrays, we show that IFNγ exerts its Stat1-independent actions on m...

  9. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  10. Elucidating Key Motifs Required for Arp2/3-Dependent and Independent Actin Nucleation by Las17/WASP

    Science.gov (United States)

    Urbanek, Agnieszka N.; Smaczynska-de Rooij, Iwona I.

    2016-01-01

    Actin nucleation is the key rate limiting step in the process of actin polymerization, and tight regulation of this process is critical to ensure actin filaments form only at specific times and at defined regions of the cell. Arp2/3 is a well-characterised protein complex that can promote nucleation of new filaments, though its activity requires additional nucleation promotion factors (NPFs). The best recognized of these factors are the WASP family of proteins that contain binding motifs for both monomeric actin and for Arp2/3. Previously we demonstrated that the yeast WASP homologue, Las17, in addition to activating Arp2/3 can also nucleate actin filaments de novo, independently of Arp2/3. This activity is dependent on its polyproline rich region. Through biochemical and in vivo analysis we have now identified key motifs within the polyproline region that are required for nucleation and elongation of actin filaments, and have addressed the role of the WH2 domain in the context of actin nucleation without Arp2/3. We have also demonstrated that full length Las17 is able to bind liposomes giving rise to the possibility of direct linkage of nascent actin filaments to specific membrane sites to which Las17 has been recruited. Overall, we propose that Las17 functions as the key initiator of de novo actin filament formation at endocytic sites by nucleating, elongating and tethering nascent filaments which then serve as a platform for Arp2/3 recruitment and function. PMID:27637067

  11. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  12. 29 CFR 794.116 - “Independently * * * controlled.”

    Science.gov (United States)

    2010-07-01

    ... STANDARDS ACT Exemption From Overtime Pay Requirements Under Section 7(b)(3) of the Act âindependently Owned... wholesale or bulk distribution of petroleum products enters into franchise or other arrangements which have...

  13. Investigation on waste disposal in big boreholes. Project 'Second phase of the assessment of the repository at Novaya Zemlya'. Final report - short version

    International Nuclear Information System (INIS)

    2003-12-01

    This report contains the independent view of experts from SKB (Sweden), DBE TECHNOLOGY (Germany) and Institute for Energy Technology (Norway) and is the result of a project performed under a contract funded by the Norwegian Royal Ministry of Foreign Affairs, Swedish International Projects, the Project Unit for radioactive waste disposal of the German Federal Ministry of Economics and Employment and the German Federal Ministry of Ecology, Nature Preservation and Reactor Safety. The work has been carried out in cooperation with VNIPI PT (Russian Federation). The authors of this report accept no liability that arises from the use of material in this report, relating either to nuclear or civil issues. Any publishing or copying of the report in whole or in part requires the explicit approval of the mentioned funding parties. This report has been approved for issue according to the requirements of the project QA procedure. (orig.)

  14. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  15. The NLC Software Requirements Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Shoaee, Hamid

    2002-08-20

    We describe the software requirements and development methodology developed for the NLC control system. Given the longevity of that project, and the likely geographical distribution of the collaborating engineers, the planned requirements management process is somewhat more formal than the norm in high energy physics projects. The short term goals of the requirements process are to accurately estimate costs, to decompose the problem, and to determine likely technologies. The long term goal is to enable a smooth transition from high level functional requirements to specific subsystem and component requirements for individual programmers, and to support distributed development. The methodology covers both ends of that life cycle. It covers both the analytical and documentary tools for software engineering, and project management support. This paper introduces the methodology, which is fully described in [1].

  16. 10 CFR 830.120 Criterion 10, Independent Assessment: We're here to help you exclamation point

    International Nuclear Information System (INIS)

    Farrell, R.E.

    1995-01-01

    Each organization performing activities in the DOE Weapons Complex is required to have an pendent assessment function. This is consistent from DOE Order 5700.6C, Quality Assurance to 10 CFR 830-120, sometimes referred to as the Price-Anderson rule. DOE Order 5700.6C, Criterion 10 Independent Assessment requires, '' Planned and periodic independent assessments shall be conducted to measure item quality and process effectiveness and to promote improvement. The organization performing independent assessments shall have sufficient authority and freedom from the line organization to carry out its responsibilities. Persons conducting independent assessments shall be technically qualified and knowledgeable in the areas assessed.'' 10 CFR 830.120, (c) Quality assurance criteria -- (3) Assessment -- (ii) Independent Assessment requires,''Independent assessments shall be planned and conducted to measure item and service quality, to measure the adequacy of work performance, and to promote improvement. The group performing independent assessments shall have sufficient authority and freedom from the line to carry out its responsibilities. Persons conducting independent assessments shall be technically qualified and knowledgeable in the areas assessed.''

  17. Mise en Scene: Conversion of Scenarios to CSP Traces for the Requirements-to-Design-to-Code Project

    Science.gov (United States)

    Carter. John D.; Gardner, William B.; Rash, James L.; Hinchey, Michael G.

    2007-01-01

    The "Requirements-to-Design-to-Code" (R2D2C) project at NASA's Goddard Space Flight Center is based on deriving a formal specification expressed in Communicating Sequential Processes (CSP) notation from system requirements supplied in the form of CSP traces. The traces, in turn, are to be extracted from scenarios, a user-friendly medium often used to describe the required behavior of computer systems under development. This work, called Mise en Scene, defines a new scenario medium (Scenario Notation Language, SNL) suitable for control-dominated systems, coupled with a two-stage process for automatic translation of scenarios to a new trace medium (Trace Notation Language, TNL) that encompasses CSP traces. Mise en Scene is offered as an initial solution to the problem of the scenarios-to-traces "D2" phase of R2D2C. A survey of the "scenario" concept and some case studies are also provided.

  18. Fear extinction requires infralimbic cortex projections to the basolateral amygdala.

    Science.gov (United States)

    Bloodgood, Daniel W; Sugam, Jonathan A; Holmes, Andrew; Kash, Thomas L

    2018-03-06

    Fear extinction involves the formation of a new memory trace that attenuates fear responses to a conditioned aversive memory, and extinction impairments are implicated in trauma- and stress-related disorders. Previous studies in rodents have found that the infralimbic prefrontal cortex (IL) and its glutamatergic projections to the basolateral amygdala (BLA) and basomedial amygdala (BMA) instruct the formation of fear extinction memories. However, it is unclear whether these pathways are exclusively involved in extinction, or whether other major targets of the IL, such as the nucleus accumbens (NAc) also play a role. To address this outstanding issue, the current study employed a combination of electrophysiological and chemogenetic approaches in mice to interrogate the role of IL-BLA and IL-NAc pathways in extinction. Specifically, we used patch-clamp electrophysiology coupled with retrograde tracing to examine changes in neuronal activity of the IL and prelimbic cortex (PL) projections to both the BLA and NAc following fear extinction. We found that extinction produced a significant increase in the intrinsic excitability of IL-BLA projection neurons, while extinction appeared to reverse fear-induced changes in IL-NAc projection neurons. To establish a causal counterpart to these observations, we then used a pathway-specific Designer Receptors Exclusively Activated by Designer Drugs (DREADD) strategy to selectively inhibit PFC-BLA projection neurons during extinction acquisition. Using this approach, we found that DREADD-mediated inhibition of PFC-BLA neurons during extinction acquisition impaired subsequent extinction retrieval. Taken together, our findings provide further evidence for a critical contribution of the IL-BLA neural circuit to fear extinction.

  19. SEU blending project, concept to commercial operation, Part 3: production of powder for demonstration irradiation fuel bundles

    International Nuclear Information System (INIS)

    Ioffe, M.S.; Bhattacharjee, S.; Oliver, A.J.; Ozberk, E.

    2005-01-01

    The processes for production of Slightly Enriched Uranium (SEU) dioxide powder and Blended Dysprosium and Uranium (BDU) oxide powder that were developed at laboratory scale at Cameco Technology Development (CTD), were implemented and further optimized to supply to Zircatec Precision Industries (ZPI) the quantities required for manufacturing twenty six Low Void Reactivity (LVRF) CANFLEX fuel bundles. The production of this new fuel was a challenge for CTD and involved significant amount of work to prepare and review documentation, develop and approve new analytical procedures, and go through numerous internal reviews and audits by Bruce Power, CNSC and third parties independent consultants that verified the process and product quality. The audits were conducted by Quality Assurance specialists as well as by Human Factor Engineering experts with the objective to systematically address the role of human errors in the manufacturing of New Fuel and confirm whether or not a credible basis had been established for preventing human errors. The project team successfully passed through these audits. The project management structure that was established during the SEU and BDU blending process development, which included a cross-functional project team from several departments within Cameco, maintained its functionality when Cameco Technology Development was producing the powder for manufacturing Demonstration Irradiation fuel bundles. Special emphasis was placed on the consistency of operating steps and product quality certification, independent quality surveillance, materials segregation protocol, enhanced safety requirements, and accurate uranium accountability. (author)

  20. The Identification and Comparison of the Requirements Placed on Product Managers during the Recruitment Process

    Directory of Open Access Journals (Sweden)

    Wroblowská Zuzana

    2015-09-01

    Full Text Available The submitted paper focuses on personality traits and behavioural competencies of a key role bearer in product oriented marketing management, generally referred to as product management. An interdisciplinary approach was applied while looking into this subject, since both research into theoretical bases and analysis of the current state of the topic and the tendencies of its development required work in several fields of study. Based on research in the field of secondary data, the assumption was set that a product manager is an example of a knowledge worker of the 21st century and that the business practice sees him/her as such, which has an effect on the requirements a candidate for this position is confronted with in the recruitment process. An independent research project was carried out and it confirmed that product managers are considered to be knowledge workers and that independence and analytical thinking skills were among the most common requirements for product managers both in 2007 and 2014. A comparison of results from 2007 and 2014 also showed some differences. The statistical verification confirmed a shift in requirements within the interpersonal competency group. The findings were used to formulate recommendations for the recruitment strategy and realization of selection for positions in product management.

  1. Advanced nuclear reactor public opinion project. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  2. Quantifying the temperature-independent effect of stratospheric aerosol geoengineering on global-mean precipitation in a multi-model ensemble

    International Nuclear Information System (INIS)

    Ferraro, Angus J; Griffiths, Hannah G

    2016-01-01

    The reduction in global-mean precipitation when stratospheric aerosol geoengineering is used to counterbalance global warming from increasing carbon dioxide (CO 2 ) concentrations has been mainly attributed to the temperature-independent effect of CO 2 on atmospheric radiative cooling. We demonstrate here that stratospheric sulphate aerosol itself also acts to reduce global-mean precipitation independent of its effects on temperature. The temperature-independent effect of stratospheric aerosol geoenginering on global-mean precipitation is calculated by removing temperature-dependent effects from climate model simulations of the Geoengineering Model Intercomparison Project (GeoMIP). When sulphate aerosol is injected into the stratosphere at a rate of 5 Tg SO 2 per year the aerosol reduces global-mean precipitation by approximately 0.2 %, though multiple ensemble members are required to separate this effect from internal variability. For comparison, the precipitation reduction from the temperature-independent effect of increasing CO 2 concentrations under the RCP4.5 scenario of the future is approximately 0.5 %. The temperature-independent effect of stratospheric sulphate aerosol arises from the aerosol’s effect on tropospheric radiative cooling. Radiative transfer calculations show this is mainly due to increasing downward emission of infrared radiation by the aerosol, but there is also a contribution from the stratospheric warming the aerosol causes. Our results suggest climate model simulations of solar dimming can capture the main features of the global-mean precipitation response to stratospheric aerosol geoengineering. (letter)

  3. Rate-Independent Processes with Linear Growth Energies and Time-Dependent Boundary Conditions

    Czech Academy of Sciences Publication Activity Database

    Kružík, Martin; Zimmer, J.

    2012-01-01

    Roč. 5, č. 3 (2012), s. 591-604 ISSN 1937-1632 R&D Projects: GA AV ČR IAA100750802 Grant - others:GA ČR(CZ) GAP201/10/0357 Institutional research plan: CEZ:AV0Z10750506 Keywords : concentrations * oscillations * time - dependent boundary conditions * rate-independent evolution Subject RIV: BA - General Mathematics http://library.utia.cas.cz/separaty/2011/MTR/kruzik-rate-independent processes with linear growth energies and time - dependent boundary conditions.pdf

  4. Microphonics control for Project X

    International Nuclear Information System (INIS)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.

    2011-01-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High β 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  5. Microphonics control for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.; /Fermilab

    2011-03-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  6. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  7. How new power generation technologies will affect the development of independent power

    International Nuclear Information System (INIS)

    Bhan, S.K.

    1999-01-01

    The deregulation of electricity markets in North America have made it possible for independent power producers to generate electricity. This presentation focused on the different factors that should be considered when developing cogeneration projects, including their inherent environmental benefits. Cogeneration is the combined production of thermal energy and electricity. The main requirement for cogeneration is that there should be a market for both electricity as well as thermal energy. This means that any large institutions where steam or hot water is used for heating can qualify for cogeneration of electricity. The development of cogeneration projects has been encouraged by recent advances in technology in gas turbines, micro-turbines, coal-fired generation and fuel cells. Future technologies will include improved circulating fluidized bed boilers, low NO x burners, and selective catalytic reactors. The newest technologies claim to achieve simple cycle efficiency approaching 40 per cent. In the combined cycle, efficiencies of 60 per cent can be achieved, while 80 per cent efficiency can be achieved in cogeneration. This paper described various cogeneration options including: (1) gas turbines with unfired heat recovery steam generators (HRSG), (2) gas turbines with fired HRSG, (3) combined cycle plants, and (4) reciprocating engines. The efficiency of cogeneration makes it a viable option for reducing greenhouse gases (GHGs). 5 tabs

  8. 30 March 2009 - Representatives of the Danish Council for Independent Research Natural Sciences visiting the LHC tunnel at Point 1 with Collaboration Spokesperson F. Gianotti, Former Spokesperson P. Jenni and Transition Radiation Tracker Project Leader C. Rembser.

    CERN Document Server

    Maximilien Brice

    2009-01-01

    30 March 2009 - Representatives of the Danish Council for Independent Research Natural Sciences visiting the LHC tunnel at Point 1 with Collaboration Spokesperson F. Gianotti, Former Spokesperson P. Jenni and Transition Radiation Tracker Project Leader C. Rembser.

  9. THE PLANNING OF A CUSTOMER RELATIONSHIP MANAGEMENT PROJECT: REQUIREMENTS AND OPPORTUNITIES

    Directory of Open Access Journals (Sweden)

    Adriana OLARU

    2007-01-01

    Full Text Available After a brief presentation of the aspects regarding the planning of a customer relationship management (CRM project, we emphasize the factors that assure the success of such an approach. In order to obtain the attended results, an organization needs the best selection of the project manager and the most efficient teamwork, which implies employees from the company’s departments and also IT specialists. In the final part, we made appreciations concerning the efficiency of a CRM project and the opportunities created by its implementation.

  10. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  11. Role of participants in nuclear power projects

    International Nuclear Information System (INIS)

    Polliart, A.J.

    1977-01-01

    In this article staffing requirements for nuclear projects (Turnkey Contract) and the owner's staff requirements, project planning, project implementation, and plant construction and commissioning are treated. (HK) [de

  12. Towards a Scope Management of Non-Functional Requirements in Requirements Engineering

    NARCIS (Netherlands)

    Kassab, M.; Ormandjieva, O.; Daneva, Maia; Ebert, C.; Herrmann, A.; Rupp, C.

    2007-01-01

    Getting business stakeholders’ goals formulated clearly and project scope defined realistically increases the chance of success for any application development process. As a consequence, stakeholders at early project stages acquire as much as possible knowledge about the requirements, their risk

  13. Rayleigh scatter in kilovoltage x-ray imaging: is the independent atom approximation good enough?

    Science.gov (United States)

    Poludniowski, G.; Evans, P. M.; Webb, S.

    2009-11-01

    Monte Carlo simulation is the gold standard method for modelling scattering processes in medical x-ray imaging. General-purpose Monte Carlo codes, however, typically use the independent atom approximation (IAA). This is known to be inaccurate for Rayleigh scattering, for many materials, in the forward direction. This work addresses whether the IAA is sufficient for the typical modelling tasks in medical kilovoltage x-ray imaging. As a means of comparison, we incorporate a more realistic 'interference function' model into a custom-written Monte Carlo code. First, we conduct simulations of scatter from isolated voxels of soft tissue, adipose, cortical bone and spongiosa. Then, we simulate scatter profiles from a cylinder of water and from phantoms of a patient's head, thorax and pelvis, constructed from diagnostic-quality CT data sets. Lastly, we reconstruct CT numbers from simulated sets of projection images and investigate the quantitative effects of the approximation. We show that the IAA can produce errors of several per cent of the total scatter, across a projection image, for typical x-ray beams and patients. The errors in reconstructed CT number, however, for the phantoms simulated, were small (typically < 10 HU). The IAA can therefore be considered sufficient for the modelling of scatter correction in CT imaging. Where accurate quantitative estimates of scatter in individual projection images are required, however, the appropriate interference functions should be included.

  14. Projecting India's energy requirements for policy formulation

    International Nuclear Information System (INIS)

    Parikh, Kirit S.; Karandikar, Vivek; Rana, Ashish; Dani, Prasanna

    2009-01-01

    Energy policy has to have a long-term perspective. To formulate it one needs to know the contours of energy requirements and options. Different approaches have been followed in literature, each with their own problems. A top down econometric approach provides little guidance on policies, while a bottom up approval requires too much knowledge and too many assumptions. Using top-down econometric approach for aggregate overall benchmarking and a detailed activity analysis model, Integrated Energy System Model, for a few large sectors, provides a unique combination for easing the difficulties of policy formulation. The model is described in this paper. Eleven alternate scenarios are built, designed to map out extreme points of feasible options. Results show that even after employing all domestic energy resource to their full potential, there will be a continued rise of fossil fuel use, continued importance of coal, and continued rise of import dependence. Energy efficiency emerges as a major option with a potential to reduce energy requirement by as much as 17%. Scenario results point towards pushing for development of alternative sources. (author)

  15. Inflammasome-independent NLRP3 is required for epithelial-mesenchymal transition in colon cancer cells.

    Science.gov (United States)

    Wang, Hong; Wang, Yajing; Du, Qianming; Lu, Ping; Fan, Huimin; Lu, Jinrong; Hu, Rong

    2016-03-15

    Inflammasome NLRP3 plays a crucial role in the process of colitis and colitis--associated colon cancer. Even though much is known regarding the NLRP3 inflammasome that regulates pro-inflammatory cytokine release in innate immune cells, the role of NLRP3 in non-immune cells is still unclear. In this study, we showed that NLRP3 was highly expressed in mesenchymal-like colon cancer cells (SW620), and was upregulated by tumor necrosis factors-α (TNF-α) and transforming growth factor-β1 (TGF-β1) respectively, during EMT in colon cancer epithelial cells HCT116 and HT29. Knockdown of NLRP3 retained epithelial spindle-like morphology of HCT116 and HT29 cells and reversed the mesenchymal characteristic of SW620 cells, indicated by the decreased expression of vimentin and MMP9 and increased expression of E-cadherin. In addition, knockdown of NLRP3 in colorectal carcinoma cells displayed diminished cell migration and invasion. Interestingly, during the EMT process induced by TNF-α or TGF-β1, the cleaved caspase-1 and ASC speck were not detected, indicating that NLRP3 functions in an inflammasome-independent way. Further studies demonstrated that NLRP3 protein expression was regulated by NF-κB signaling in TNF-α or TGF-β1-induced EMT, as verified by the NF-κB inhibitor Bay 11-7082. Moreover, NLRP3 knockdown reduced the expression of Snail1, indicating that NLRP3 may promote EMT through regulating Snail1. In summary, our results showed that the NLRP3 expression, not the inflammasome activation, was required for EMT in colorectal cancer cells. Copyright © 2016 Elsevier Inc. All rights reserved.

  16. Independently Controlled Wing Stroke Patterns in the Fruit Fly Drosophila melanogaster

    Czech Academy of Sciences Publication Activity Database

    Chakraborty, Soma; Bartussek, Jan; Fry, S.N.; Zápotocký, Martin

    2015-01-01

    Roč. 10, č. 2 (2015), e0116813 E-ISSN 1932-6203 R&D Projects: GA ČR(CZ) GBP304/12/G069 Institutional support: RVO:67985823 Keywords : motor control * wing kinematics * independent component analysis Subject RIV: ED - Physiology Impact factor: 3.057, year: 2015

  17. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  18. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  19. Innovative Organization of Project Activity of Construction Students

    Science.gov (United States)

    Stolbova, I. D.; Aleksandrova, E. P.; Krainova, M. N.

    2017-11-01

    The construction industry competitiveness depends on its equipping with information modeling technologies. This requires training and development of human resources. The advantages of BIM-technologies are considered. The requirements for the specialists capable of promoting information modeling technologies in the construction industry are discussed. For a wide application of BIM-technologies, the problem of training personnel with a new thinking must be solved. When preparing graduates of the major “Construction”, it is necessary to introduce innovative educational technologies aimed at building the students’ ability for team work, competences in the field of modern information and communication technologies, as well as design skills basing on spatial modeling. Graphic training is the first discipline of the professional orientation for construction students. In the context of training it is important to create such learning environment that is close to a professional one. The paper provides the examples of practice-oriented assignments based on the project method in the course of students’ independent work.

  20. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  1. Independent assessment for new nuclear reactor safety

    Directory of Open Access Journals (Sweden)

    D'Auria Francesco

    2017-01-01

    Full Text Available A rigorous framework for safety assessment is established in all countries where nuclear technology is used for the production of electricity. On the one side, industry, i.e. reactor designers, vendors and utilities perform safety analysis and demonstrate consistency between results of safety analyses and requirements. On the other side, regulatory authorities perform independent assessment of safety and confirm the acceptability of safety of individual reactor units. The process of comparing results from analyses by reactor utilities and regulators is very complex. The process is also highly dependent upon mandatory approaches pursued for the analysis and from very many details which required the knowledge of sensitive proprietary data (e.g. spacer designs. Furthermore, all data available for the design, construction and operation of reactors produced by the nuclear industry are available to regulators. Two areas for improving the process of safety assessment for individual Nuclear Power Plant Units are identified: New details introduced by industry are not always and systematically requested by regulators for the independent assessment; New analytical techniques and capabilities are not necessarily used in the analyses by regulators (and by the industry. The established concept of independent assessment constitutes the way for improving the process of safety assessment. This is possible, or is largely facilitated, by the recent availability of the so-called Best Estimate Plus Uncertainty approach.

  2. Independent assessment for new nuclear reactor safety

    International Nuclear Information System (INIS)

    D'Auria, F.; Glaeser, H.; Debrecin, N.

    2017-01-01

    A rigorous framework for safety assessment is established in all countries where nuclear technology is used for the production of electricity. On one side, industry, i.e. reactor designers, vendors and utilities perform safety analysis and demonstrate consistency between results of safety analyses and requirements. On the other side, regulatory authorities perform independent assessment of safety and confirm the acceptability of safety of individual reactor units. The process of comparing results from analyses by reactor utilities and regulators is very complex. The process is also highly dependent upon mandatory approaches pursued for the analysis and from very many details which required the knowledge of sensitive proprietary data (e.g. spacer designs). Furthermore, all data available for the design, construction and operation of reactors produced by the nuclear industry are available to regulators. Two areas for improving the process of safety assessment for individual Nuclear Power Plant Units are identified: New details introduced by industry are not always and systematically requested by regulators for the independent assessment; New analytical techniques and capabilities are not necessarily used in the analyses by regulators (and by the industry). The established concept of independent assessment constitutes the way for improving the process of safety assessment. This is possible, or is largely facilitated, by the recent availability of the so-called Best Estimate Plus Uncertainty (BEPU) approach. (authors)

  3. Quality Assurance Source Requirements Traceability Database

    International Nuclear Information System (INIS)

    MURTHY, R.; NAYDENOVA, A.; DEKLEVER, R.; BOONE, A.

    2006-01-01

    At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance

  4. Smart gun technology requirements preliminary report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    1995-05-01

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  5. Independent engineering review of the Hanford Waste Vitrification System

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs

  6. Independent engineering review of the Hanford Waste Vitrification System

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs.

  7. Determining priorities of current and long-range pollution control projects

    Energy Technology Data Exchange (ETDEWEB)

    Clark, E O

    1977-01-01

    The dilemma facing corporations of setting priorities on pollution control projects is reviewed and procedural guidelines outlined. The management must support those assigned to analyze priorities so that they have the opportunity to experiment and make quantitative studies, to evaluate their results, and to make independent recommendations. Priority is then given to the problems of air, noise, water, and land pollution in accordance with the company's environmental record. Each of the four categories, however, has its own legal, technical, and financial aspects that require further priority analysis. Each company must adopt and publish a regularly updated environmental policy that will have public visibility. (DCK)

  8. Supplemental design requirements document, Project W026

    International Nuclear Information System (INIS)

    Weidert, J.R.

    1993-01-01

    This document supplements and extends the Functional Design Criteria, SP-W026-FDC-001, for the Waste Receiving and Processing Facility (WRAP), Module 1. It provides additional detailed requirements, summarizes key Westinghouse Hanford Company design guidance, and establishes baseline technical agreements to be used in definitive design of the WRAP-1 facility. Revision 3 of the Supplemental Design Requirements Document has been assigned an Impact Level of 3ESQ based on the content of the entire revision. The actual changes made from Revision 2 have an Impact Level of 3S and the basis for these changes was previously reviewed and approved per WHC correspondence No. 9355770

  9. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  10. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  11. Metrology for hydrogen energy applications: a project to address normative requirements

    Science.gov (United States)

    Haloua, Frédérique; Bacquart, Thomas; Arrhenius, Karine; Delobelle, Benoît; Ent, Hugo

    2018-03-01

    Hydrogen represents a clean and storable energy solution that could meet worldwide energy demands and reduce greenhouse gases emission. The joint research project (JRP) ‘Metrology for sustainable hydrogen energy applications’ addresses standardisation needs through pre- and co-normative metrology research in the fast emerging sector of hydrogen fuel that meet the requirements of the European Directive 2014/94/EU by supplementing the revision of two ISO standards that are currently too generic to enable a sustainable implementation of hydrogen. The hydrogen purity dispensed at refueling points should comply with the technical specifications of ISO 14687-2 for fuel cell electric vehicles. The rapid progress of fuel cell technology now requires revising this standard towards less constraining limits for the 13 gaseous impurities. In parallel, optimized validated analytical methods are proposed to reduce the number of analyses. The study aims also at developing and validating traceable methods to assess accurately the hydrogen mass absorbed and stored in metal hydride tanks; this is a research axis for the revision of the ISO 16111 standard to develop this safe storage technique for hydrogen. The probability of hydrogen impurity presence affecting fuel cells and analytical techniques for traceable measurements of hydrogen impurities will be assessed and new data of maximum concentrations of impurities based on degradation studies will be proposed. Novel validated methods for measuring the hydrogen mass absorbed in hydrides tanks AB, AB2 and AB5 types referenced to ISO 16111 will be determined, as the methods currently available do not provide accurate results. The outputs here will have a direct impact on the standardisation works for ISO 16111 and ISO 14687-2 revisions in the relevant working groups of ISO/TC 197 ‘Hydrogen technologies’.

  12. A Requirements Analysis Model Based on QFD

    Institute of Scientific and Technical Information of China (English)

    TANG Zhi-wei; Nelson K.H.Tang

    2004-01-01

    The enterprise resource planning (ERP) system has emerged to offer an integrated IT solution and more and more enterprises are increasing by adopting this system and regarding it as an important innovation. However, there is already evidence of high failure risks in ERP project implementation, one major reason is poor analysis of the requirements for system implementation. In this paper, the importance of requirements analysis for ERP project implementation is highlighted, and a requirements analysis model by applying quality function deployment (QFD) is presented, which will support to conduct requirements analysis for ERP project.

  13. Model-independent X-ray Mass Determinations for Clusters of Galaxies

    Science.gov (United States)

    Nulsen, Paul

    2005-09-01

    We propose to use high quality X-ray data from the Chandra archive to determine the mass distributions of about 60 clusters of galaxies over the largest possible range of radii. By avoiding unwarranted assumptions, model-independent methods make best use of high quality data. We will employ two model-independent methods. That used by Nulsen & Boehringer (1995) to determine the mass of the Virgo Cluster and a new method, that will be developed as part of the project. The new method will fit a general mass model directly to the X-ray spectra, making best possible use of the fitting errors to constrain mass profiles.

  14. Independent checks of linear accelerators equipped with multileaf collimators

    International Nuclear Information System (INIS)

    Pavlikova, I.; Ekendahl, D.; Horakova, I.

    2005-01-01

    National Radiation Protection Institute (NRPI) provides independent checks of therapeutic equipment as a part of state supervision. In the end of 2003, the audit was broaden for linear accelerators equipped with multileaf collimators (MLC). NRPI provides TLD postal audits and on-site independent checks. This contribution describes tests for multileaf collimators and intensity modulated radiation therapy (IMRT) technique that are accomplished within the independent on-site check of linear accelerators. The character and type of tests that are necessary to pursue for multileaf collimator depends on application technique. There are three basic application of the MLC. The first we call 'static MLC' and it serves for replacing conventional blocking or for adjusting the field shape to match the beam's-eye view projection of a planning target volume during an arc rotation of the x-ray beam. This procedure is called conformal radiotherapy. The most advanced technique with MLC is intensity modulated radiation therapy. The dose can be delivered to the patient with IMRT in various different ways: dynamic MLC, segmented MLC and IMRT arc therapy. Independent audits represent an important instrument of quality assurance. Methodology for independent check of static MLC was successfully verified on two types of accelerators: Varian and Elekta. Results from pilot measurements with dynamic MLC imply that the methodology is applicable for Varian accelerators. In the future, the experience with other types of linear accelerators will contribute to renovation, modification, and broaden independent checks methodology. (authors)

  15. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  16. Halo-independent methods for inelastic dark matter scattering

    International Nuclear Information System (INIS)

    Bozorgnia, Nassim; Schwetz, Thomas; Herrero-Garcia, Juan; Zupan, Jure

    2013-01-01

    We present halo-independent methods to analyze the results of dark matter direct detection experiments assuming inelastic scattering. We focus on the annual modulation signal reported by DAMA/LIBRA and present three different halo-independent tests. First, we compare it to the upper limit on the unmodulated rate from XENON100 using (a) the trivial requirement that the amplitude of the annual modulation has to be smaller than the bound on the unmodulated rate, and (b) a bound on the annual modulation amplitude based on an expansion in the Earth's velocity. The third test uses the special predictions of the signal shape for inelastic scattering and allows for an internal consistency check of the data without referring to any astrophysics. We conclude that a strong conflict between DAMA/LIBRA and XENON100 in the framework of spin-independent inelastic scattering can be established independently of the local properties of the dark matter halo

  17. Climate Change Risk Management Consulting: The opportunity for an independent business practice

    Science.gov (United States)

    Ciccozzi, R.

    2009-04-01

    The Paper outlines the main questions to be addressed with reference to the actual demand of climate change risk management consulting, in the financial services. Moreover, the Project shall also try to investigate if the Catastrophe Modelling Industry can start and manage a business practice specialised on climate change risk exposures. In this context, the Paper aims at testing the possibility to build a sound business case, based upon typical MBA course analysis tools, such as PEST(LE), SWOT, etc. Specific references to the tools to be used and to other contribution from academic literature and general documentation are also discussed in the body of the Paper and listed at the end. The analysis shall also focus on the core competencies required for an independent climate change risk management consulting business practice, with the purpose to outline a valid definition of how to achieve competitive advantage in climate change risk management consulting.

  18. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  19. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  20. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  1. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  2. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  3. Manual heat pumps. Planning and projecting; Handbuch Waermepumpen. Planung und Projektierung

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, Juergen

    2009-07-01

    The special value of this publication for planning and projecting of heat pump devices lays in an information processing independent of manufacturers: specialists of civil engineering receive so a fact source to compare as much as possible systems and possibilities. Furthermore renewable energy sources to change heating systems are presented - which is from advantage during times of high energy cost. Main topics on overview: ecological and economical aspects, introduction in refrigerating engineering, water-water heat pump devices, brake-water- and air-water heat pump devices, projecting of all required components as well as projecting examples (tasks and solutions). (orig./GL) [German] Der besondere Wert dieser Publikation zur Planung und Projektierung von Waermepumpenanlagen liegt in einer markenneutral gehaltenen Informationsaufbereitung: Fachkraefte der Baubranche erhalten so eine Faktenquelle zum Vergleichen moeglichst vieler Systeme und Moeglichkeiten. Zudem werden alternative Energiequellen zur Heizungsumstellung vorgestellt - was gerade in Zeiten hoher Energiekosten von grossem Vorteil ist. Schwerpunkte im Ueberblick: Oekologische und wirtschaftliche Aspekte, Einfuehrung in die Kaeltetechnik, Wasser-Wasser-Waermepumpenanlagen, Sole-Wasser-Waermepumpenanlagen, Luft-Wasser-Waermepumpenanlagen, Projektierung aller erforderlichen Komponenten sowie Projektierungsbeispiele (Aufgaben und Loesungen). (orig.)

  4. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  5. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  6. Does Listening to Slow Tempo Classical Music During Independent Writing Affect Children's On-Task Performance?

    Science.gov (United States)

    McKnight, Rosemary

    This project explored the effects of slow tempo classical music on children's on-task performance during independent writing. The project sample consisted of 24 students from a first grade classroom in the New York City Public School System. The students' on-task behavior was observed with and without use of slow tempo classical music playing, and…

  7. Comparison of energy performance requirements levels

    DEFF Research Database (Denmark)

    Spiekman, Marleen; Thomsen, Kirsten Engelund; Rose, Jørgen

    This summary report provides a synthesis of the work within the EU SAVE project ASIEPI on developing a method to compare the energy performance (EP) requirement levels among the countries of Europe. Comparing EP requirement levels constitutes a major challenge. From the comparison of for instance...... the present Dutch requirement level (EPC) of 0,8 with the present Flemish level of E80, it can easily be seen that direct comparison is not possible. The conclusions and recommendations of the study are presented in part A. These constitute the most important result of the project. Part B gives an overview...... of all other project material related to that topic, which allows to easily identify the most pertinent information. Part C lists the project partners and sponsors....

  8. Identify and Manage the Software Requirements Volatility

    OpenAIRE

    Khloud Abd Elwahab; Mahmoud Abd EL Latif; Sherif Kholeif

    2016-01-01

    Management of software requirements volatility through development of life cycle is a very important stage. It helps the team to control significant impact all over the project (cost, time and effort), and also it keeps the project on track, to finally satisfy the user which is the main success criteria for the software project. In this research paper, we have analysed the root causes of requirements volatility through a proposed framework presenting the requirements volatility causes and how...

  9. A Model of Project and Organisational Dynamics

    Directory of Open Access Journals (Sweden)

    Jenny Leonard

    2012-04-01

    Full Text Available The strategic, transformational nature of many information systems projects is now widely understood. Large-scale implementations of systems are known to require significant management of organisational change in order to be successful. Moreover, projects are rarely executed in isolation – most organisations have a large programme of projects being implemented at any one time. However, project and value management methodologies provide ad hoc definitions of the relationship between a project and its environment. This limits the ability of an organisation to manage the larger dynamics between projects and organisations, over time, and between projects. The contribution of this paper, therefore, is to use literature on organisational theory to provide a more systematic understanding of this area. The organisational facilitators required to obtain value from a project are categorised, and the processes required to develop those facilitators are defined. This formalisation facilitates generalisation between projects and highlights any time and path dependencies required in developing organisational facilitators. The model therefore has the potential to contribute to the development of IS project management theory within dynamic organisational contexts. Six cases illustrate how this model could be used.

  10. 24 CFR 266.507 - Maintenance requirements.

    Science.gov (United States)

    2010-04-01

    ... HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.507 Maintenance requirements. The mortgagor must maintain the project in...

  11. Time-independent limit of a creep-recovery constitutive equation

    International Nuclear Information System (INIS)

    Chang, S.J.

    1984-01-01

    The effect of strain recovery is taken into consideration in ORNL efforts to establish unified constitutive equations for time-dependent plastic deformation for metals at elevated temperatures. Representation by internal state variables and Rice's flow potential are under consideration. Here the growth law for the internal state variables is discussed and interpreted in terms of a generalized form of the kinematic hardening condition of Prager. The yield condition is obtained from the flow potential representation of the inelastic strain rate. A consistency condition is derived from the yield condition and leads to a flow rule which assumes a slightly general form as compared with that of the classical plasticity due to the effect of strain recovery and the time-dependent property of the yield condition. Based on this representation, the time-independent limit is discussed. From a vanishing effect of recovery and a rate-independent limit for the yield condition at low temperature, this flow rule reduces to the well-known form of time-independent plasticity with a kinematic hardening condition. The duration of time (the characteristic time) required for the inelastic strain to reach its saturated value is defined for the inelastic loading condition. It provides the measure of a minimum duration of time which is required for a valid approximation made by the time-independent plasticity model

  12. All projects related to Canada | Page 19 | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    This project follows two years of successful research under project 102661 on forced ... The North-South Institute (NSI) is the leading independent think-tank on ... In developing countries, young people are often called upon to take on adult ...

  13. Anticipating requirements changes-using futurology in requirements elicitation

    OpenAIRE

    Pimentel, João Henrique; Santos, Emanuel; Castro, Jaelson; Franch Gutiérrez, Javier

    2012-01-01

    It is well known that requirements changes in a later phase of software developments is a major source of software defects and costs. Thus, the need of techniques to control or reduce the amount of changes during software development projects. The authors advocate the use of foresight methods as a valuable input to requirements elicitation, with the potential to decrease the number of changes that would be required after deployment, by anticipating them. In this paper, the authors define a pr...

  14. Graphical user interface prototyping for distributed requirements engineering

    CERN Document Server

    Scheibmayr, Sven

    2014-01-01

    Finding and understanding the right requirements is essential for every software project. This book deals with the challenge to improve requirements engineering in distributed software projects. The use of graphical user interface (GUI) prototypes can help stakeholders in such projects to elicit and specify high quality requirements. The research objective of this study is to develop a method and a software artifact to support the activities in the early requirements engineering phase in order to overcome some of the difficulties and improve the quality of the requirements, which should eventu

  15. 13 CFR 120.860 - Required objectives.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Required objectives. 120.860 Section 120.860 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Project Economic Development Goals § 120.860 Required objectives. A Project...

  16. Projects for calculus the language of change

    CERN Document Server

    Stroyan, Keith D

    1999-01-01

    Projects for Calculus is designed to add depth and meaning to any calculus course. The fifty-two projects presented in this text offer the opportunity to expand the use and understanding of mathematics. The wide range of topics will appeal to both instructors and students. Shorter, less demanding projects can be managed by the independent learner, while more involved, in-depth projects may be used for group learning. Each task draws on special mathematical topics and applications from subjects including medicine, engineering, economics, ecology, physics, and biology.Subjects including:* Medicine* Engineering* Economics* Ecology* Physics* Biology

  17. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  18. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  19. Requirements Definition for ORNL Trusted Corridors Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Hill, David E [ORNL; Smith, Cyrus M [ORNL; DeNap, Frank A [ORNL; White, James D [ORNL; Gross, Ian G [ORNL; Gorman, Bryan L [ORNL; Hively, Lee M [ORNL; Abercrombie, Robert K [ORNL

    2008-02-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  20. Requirements Definition for ORNL Trusted Corridors Project

    International Nuclear Information System (INIS)

    Walker, Randy M; Hill, David E; Smith, Cyrus M; DeNap, Frank A; White, James D; Gross, Ian G; Gorman, Bryan L; Hively, Lee M; Abercrombie, Robert K

    2008-01-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  1. Participation of the Republic of Kazakhstan in the projects: outside view

    International Nuclear Information System (INIS)

    Kontzen, Zh.P.

    2001-01-01

    Non-proliferation of mass destruction weapon serves the special condition for creators of International Scientific-Technical Center (ISTC) in Moscow. In this relation the ISTC fulfills their task by means of providing of funds for supporting of the scientists of former Soviet Union were working with nuclear weapon, by turning them to the peaceful activity. As well as this is facilitating to maintenance of relations between scientists. Formulas of cooperation such as attraction of foreign collaborators for fulfilment projects or implementation of plans for real cooperation were sufficient useful in this relation. Republic of Kazakhstan - like other CIS countries - was taking active part in proposals presentation and successfully working out that were ratified. It is stressed the ISTC projects contribution into progressive transmission toward to independence of Kazakhstan Scientific-Technical System as well as technical progress, required for the Republic prosperity in both the industrial and the social (health, environment) aspects

  2. 49 CFR 633.21 - Basic requirement.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...

  3. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  4. Multiple Independent File Parallel I/O with HDF5

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M. C.

    2016-07-13

    The HDF5 library has supported the I/O requirements of HPC codes at Lawrence Livermore National Labs (LLNL) since the late 90’s. In particular, HDF5 used in the Multiple Independent File (MIF) parallel I/O paradigm has supported LLNL code’s scalable I/O requirements and has recently been gainfully used at scales as large as O(106) parallel tasks.

  5. Analysis of Petroleum Technology Advances Through Applied Research by Independent Oil Producers

    Energy Technology Data Exchange (ETDEWEB)

    Brashear, Jerry P.; North, Walter B.; Thomas Charles P.; Becker, Alan B.; Faulder, David D.

    2000-01-12

    Petroleum Technology Advances Through Applied Research by Independent Oil Producers is a program of the National Oil Research Program, U.S. Department of Energy. Between 1995 and 1998, the program competitively selected and cost-shared twenty-two projects with small producers. The purpose was to involve small independent producers in testing technologies of interest to them that would advance (directly or indirectly) one or more of four national program objectives: (1) Extend the productive life of reservoirs; (2) Increase production and/or reserves; (3) Improve environmental performance; and (4) Broaden the exchange of technology information.

  6. 34 CFR 367.1 - What is the Independent Living Services for Older Individuals Who Are Blind program?

    Science.gov (United States)

    2010-07-01

    ... Individuals Who Are Blind program? 367.1 Section 367.1 Education Regulations of the Offices of the Department... EDUCATION INDEPENDENT LIVING SERVICES FOR OLDER INDIVIDUALS WHO ARE BLIND General § 367.1 What is the Independent Living Services for Older Individuals Who Are Blind program? This program supports projects that...

  7. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  8. Projection of future transport energy demand of Thailand

    International Nuclear Information System (INIS)

    Limanond, Thirayoot; Jomnonkwao, Sajjakaj; Srikaew, Artit

    2011-01-01

    The objective of this study is to project transport energy consumption in Thailand for the next 20 years. The study develops log-linear regression models and feed-forward neural network models, using the as independent variables national gross domestic product, population and the numbers of registered vehicles. The models are based on 20-year historical data between years 1989 and 2008, and are used to project the trends in future transport energy consumption for years 2010-2030. The final log-linear models include only gross domestic product, since all independent variables are highly correlated. It was found that the projection results of this study were in the range of 54.84-59.05 million tonnes of oil equivalent, 2.5 times the 2008 consumption. The projected demand is only 61-65% of that predicted in a previous study, which used the LEAP model. This major discrepancy in transport energy demand projections suggests that projects related to this key indicator should take into account alternative projections, because these numbers greatly affect plans, policies and budget allocation for national energy management. - Research highlights: → Thailand transport energy consumption would increase to 54.4-59.1 MTOE in Year 2030. → The log-linear models yield a slightly higher projection than the ANN models. → The elasticity of transport energy demand with respect to GDP is 0.995.

  9. Projection of future transport energy demand of Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Limanond, Thirayoot, E-mail: tlimanond@yahoo.co [School of Transportation Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima 30000 (Thailand); Jomnonkwao, Sajjakaj [School of Transportation Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima 30000 (Thailand); Srikaew, Artit [School of Electrical Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima 30000 (Thailand)

    2011-05-15

    The objective of this study is to project transport energy consumption in Thailand for the next 20 years. The study develops log-linear regression models and feed-forward neural network models, using the as independent variables national gross domestic product, population and the numbers of registered vehicles. The models are based on 20-year historical data between years 1989 and 2008, and are used to project the trends in future transport energy consumption for years 2010-2030. The final log-linear models include only gross domestic product, since all independent variables are highly correlated. It was found that the projection results of this study were in the range of 54.84-59.05 million tonnes of oil equivalent, 2.5 times the 2008 consumption. The projected demand is only 61-65% of that predicted in a previous study, which used the LEAP model. This major discrepancy in transport energy demand projections suggests that projects related to this key indicator should take into account alternative projections, because these numbers greatly affect plans, policies and budget allocation for national energy management. - Research highlights: {yields} Thailand transport energy consumption would increase to 54.4-59.1 MTOE in Year 2030. {yields} The log-linear models yield a slightly higher projection than the ANN models. {yields} The elasticity of transport energy demand with respect to GDP is 0.995.

  10. Federal Environmental Requirements for Construction

    Data.gov (United States)

    Department of Veterans Affairs — This guide provides information on federal environmental requirements for construction projects. It is written primarily for owners of construction projects and for...

  11. World nuclear fuel cycle requirements 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-10

    The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs.

  12. World nuclear fuel cycle requirements 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, ''burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs

  13. Summary of literature review of risk communication: Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Byram, S.J.

    1991-05-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation exposures people may have received from radioactive materials released during past operations at the Department of Energy's Hanford Site near Richland, Washington. The project is being conducted by Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The Centers for Disease Control (CDC) will use HEDR dose estimates in studies to investigate a potential link between thyroid disease and historical Hanford emissions. The HEDR Project was initiated to address public concerns about the possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to communicate effectively to the many different concerned audiences. To identify and develop these mechanisms, the TSP issued Directive 89-7 to PNL in May 1989. The TSP directed PNL to examine methods to communicate the causes and effects of uncertainties in the dose estimates. A literature review was conducted as the first activity in response to the TSP's directive. This report presents the results of the literature review. The objective of the literature review was to identify ''key principles'' that could be applied to develop communications strategies for the project. 26 refs., 6 figs

  14. Storage of compressed air - Optimisation and measurement of an existing project example; Druckluftspeicherung: Optimierung / Ausmessung bestehendes Projektmuster

    Energy Technology Data Exchange (ETDEWEB)

    Brueckmann, P. [Brueckmann Elektronik, Davos Dorf (Switzerland); Cyphelly, I. [Cyphelly and Cie, Les Brenets (Switzerland)

    2007-06-15

    This short final report for the Swiss Federal Office of Energy (SFOE) deals with an additional project that augmented an earlier report on a compressed-air energy storage system. First tests are reported on that revealed that the chosen heat exchanger fulfils the thermal expectations with substantial reserves. Certain effects concerning the liquid piston system are described which showed that further development of the test infrastructure were required. This project was launched to further examine these problems. Difficulties with the liquids available which prohibited the intended exact series of measurements are commented on. The authors note that independent investigations by the Austrian company LINDE came to the same conclusions, thus confirming the function of the heat exchanger.

  15. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  16. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  17. The fully Mobile City Government Project (MCity)

    DEFF Research Database (Denmark)

    Scholl, Hans; Fidel, Raya; Mai, Jens Erik

    2006-01-01

    The Fully Mobile City Government Project, also known as MCity, is an interdisciplinary research project on the premises, requirements, and effects of fully mobile, wirelessly connected applications (FWMC). The project will develop an analytical framework for interpreting the interaction and inter......The Fully Mobile City Government Project, also known as MCity, is an interdisciplinary research project on the premises, requirements, and effects of fully mobile, wirelessly connected applications (FWMC). The project will develop an analytical framework for interpreting the interaction...

  18. Victorian Women’s Independence and their Body Images Shown through their Selecting Costumes

    OpenAIRE

    佐々井, 啓; 坂井, 妙子; 好田, 由佳; 山村, 明子; 米今, 由希子

    2013-01-01

    The purpose of this project is to clarify Victorian English women’s body images and their relations to women’s sense of independence, through the examinations of contemporary women’s magazines. In examining women’s magazines, the members of the project focus on the following five issues: 1. Theatrical representations of women characters (“New Woman”) and their dresses, 2. How physiognomical observations are reflected in the presentations of dress accessories, 3. Women’s outdoor activities and...

  19. TRACER - TRACING AND CONTROL OF ENGINEERING REQUIREMENTS

    Science.gov (United States)

    Turner, P. R.

    1994-01-01

    TRACER (Tracing and Control of Engineering Requirements) is a database/word processing system created to document and maintain the order of both requirements and descriptive material associated with an engineering project. A set of hierarchical documents are normally generated for a project whereby the requirements of the higher level documents levy requirements on the same level or lower level documents. Traditionally, the requirements are handled almost entirely by manual paper methods. The problem with a typical paper system, however, is that requirements written and changed continuously in different areas lead to misunderstandings and noncompliance. The purpose of TRACER is to automate the capture, tracing, reviewing, and managing of requirements for an engineering project. The engineering project still requires communications, negotiations, interactions, and iterations among people and organizations, but TRACER promotes succinct and precise identification and treatment of real requirements separate from the descriptive prose in a document. TRACER permits the documentation of an engineering project's requirements and progress in a logical, controllable, traceable manner. TRACER's attributes include the presentation of current requirements and status from any linked computer terminal and the ability to differentiate headers and descriptive material from the requirements. Related requirements can be linked and traced. The program also enables portions of documents to be printed, individual approval and release of requirements, and the tracing of requirements down into the equipment specification. Requirement "links" can be made "pending" and invisible to others until the pending link is made "binding". Individuals affected by linked requirements can be notified of significant changes with acknowledgement of the changes required. An unlimited number of documents can be created for a project and an ASCII import feature permits existing documents to be incorporated

  20. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  1. 24 CFR 241.615 - Certification of cost requirements.

    Science.gov (United States)

    2010-04-01

    ..., including any collateral agreements. (g) Certificate of public accountant. Where required by the... independent Certified Public Accountant or independent public accountant licensed by a regulatory authority of...

  2. Required doses for projection methods in X-ray diagnosis

    International Nuclear Information System (INIS)

    Hagemann, G.

    1992-01-01

    The ideal dose requirement has been stated by Cohen et al. (1981) by a formula basing on parallel beam, maximum quantum yield and Bucky grid effect depending on the signal to noise ratio and object contrast. This was checked by means of contrast detail diagrams measured at the hole phantom, and was additionally compared with measurement results obtained with acrylic glass phantoms. The optimal dose requirement is obtained by the maximum technically possible approach to the ideal requirement level. Examples are given, besides for x-ray equipment with Gd 2 O 2 S screen film systems for grid screen mammography, and new thoracic examination systems for mass screenings. Finally, a few values concerning the dose requirement or the analogous time required for fluorscent screening in angiography and interventional radiology, are stated, as well as for dentistry and paediatric x-ray diagnostics. (orig./HP) [de

  3. Safety assessment and regulatory strategy for NPP I and C modernization projects

    International Nuclear Information System (INIS)

    Manners, S.; Blocquel, Ch.

    1999-10-01

    IPSN is the technical support for the French nuclear safety authority (DSIN), but also acts independently. Through our participation at this IAEA meeting we wish to further our appreciation of the industry position for I and C modernization projects. We will present some of the concerns of the safety assessor and safety authority for such projects. We hope to share our experiences and views concerning current strategies for I and C modernization and licensing from. In our experience with NPP I and C programmes, the need for modification is most often not directly linked to safety. For our safety assessment we have to identify clearly and, as far as possible, categorize the safety relevance of the specified modifications and all safety impact in its implementation. Modernization can be simply for reasons of replacement of obsolete existing equipment or it can be linked to functional evolutions; safety functions may be directly or indirectly affected. The state of the art I and C solutions proposed by today's modernization programs have many benefits, but also pose a certain number of difficulties for the safety demonstration. On the implementation side, the safety assessment for a modernization project has to take into consideration specific issues compared with that for new plant. These include interface and compatibility with the existing installation, issues relating to 'on line' installation and commissioning, as well as operational issues concerning the changeover and trail periods. A further subject for discussion concerns how our regulatory requirements apply to modernization. We must as a minima comply with the requirements of the period. To what measure must we apply current or future (under development or for future reactor designs) standards? How can we tie in with requirements and legislation for new projects? Do we make a special case for back-fits? (authors)

  4. Safety assessment and regulatory strategy for NPP I and C modernization projects

    Energy Technology Data Exchange (ETDEWEB)

    Manners, S.; Blocquel, Ch

    1999-10-01

    IPSN is the technical support for the French nuclear safety authority (DSIN), but also acts independently. Through our participation at this IAEA meeting we wish to further our appreciation of the industry position for I and C modernization projects. We will present some of the concerns of the safety assessor and safety authority for such projects. We hope to share our experiences and views concerning current strategies for I and C modernization and licensing from. In our experience with NPP I and C programmes, the need for modification is most often not directly linked to safety. For our safety assessment we have to identify clearly and, as far as possible, categorize the safety relevance of the specified modifications and all safety impact in its implementation. Modernization can be simply for reasons of replacement of obsolete existing equipment or it can be linked to functional evolutions; safety functions may be directly or indirectly affected. The state of the art I and C solutions proposed by today's modernization programs have many benefits, but also pose a certain number of difficulties for the safety demonstration. On the implementation side, the safety assessment for a modernization project has to take into consideration specific issues compared with that for new plant. These include interface and compatibility with the existing installation, issues relating to 'on line' installation and commissioning, as well as operational issues concerning the changeover and trail periods. A further subject for discussion concerns how our regulatory requirements apply to modernization. We must as a minima comply with the requirements of the period. To what measure must we apply current or future (under development or for future reactor designs) standards? How can we tie in with requirements and legislation for new projects? Do we make a special case for back-fits? (authors)

  5. Renewable energy technologies for irrigation water pumping in India: projected levels of dissemination, energy delivery and investment requirements using available diffusion models

    Energy Technology Data Exchange (ETDEWEB)

    Pallav Purohit; Kandpal, T.C. [Indian Institute of Technology, New Delhi (India). Centre for Energy Studies

    2005-12-01

    Using the past diffusion trends of four renewable energy technologies for irrigation water pumping in India (SPV pumps, windmill pumps and biogas/producer gas driven dual fuel engine pumps), results of an attempt to project their future dissemination levels, have been presented in this study. The likely contribution of the renewable energy options considered in the study to the projected energy demand for irrigation water pumping in India has been estimated. Estimates of the associated investment requirements taking into account the learning effect have also been presented. (author)

  6. Sustainable network of independent technical expertise for radioactive waste disposal (SITEX)

    Energy Technology Data Exchange (ETDEWEB)

    Serres, Christophe; Rocher, Muriel [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Bernier, Frederic [FANC, Brussels (Belgium); Havlova, Vaclava [UJV Rez, a.s., Rez (Czech Republic); Mrskova, Adela [DECOM A.S., Trnava (Slovakia); Dubreuil, Gilles Heriard [MUTADIS, Paris (France)

    2013-07-01

    SITEX is a 24 months FP7 Euratom project (from January 2012 to December 2013) led by IRSN and bringing together organisations representing technical safety organisations and nuclear safety authorities performing technical and scientific assessment of geological disposals for radioactive waste in the framework of their respective national regulatory review process of the safety case. Civil society outreach specialists of interaction with civil society are also involved in the project. SITEX aims at establishing the conditions required for developing sustainable interactions among experts from various horizons (nuclear safety authorities, technical safety organisations, civil society organisations..) capable of developing and coordinating joint and harmonized activities in relation with the safety assessment of the safety case. Among foreseen activities, partnership with the civil society experts is considered as a key function of the future network in order to contribute in enhancing trust in the decision making process. The SITEX program of work is split into a set of six workpackages that address technical and organizational issues allowing in fine to propose a structure of the activities and operating modes of the future network. These issues relate on the one hand to the study of the potential for sharing and developing technical expertise practices independently from the expertise developed by waste management organisations, on the other hand on the ability to implement coordinated R and D programs run by technical safety organisations in order to develop the scientific knowledge necessary to perform technical assessments. (orig.)

  7. Measurement-device-independent quantum digital signatures

    Science.gov (United States)

    Puthoor, Ittoop Vergheese; Amiri, Ryan; Wallden, Petros; Curty, Marcos; Andersson, Erika

    2016-08-01

    Digital signatures play an important role in software distribution, modern communication, and financial transactions, where it is important to detect forgery and tampering. Signatures are a cryptographic technique for validating the authenticity and integrity of messages, software, or digital documents. The security of currently used classical schemes relies on computational assumptions. Quantum digital signatures (QDS), on the other hand, provide information-theoretic security based on the laws of quantum physics. Recent work on QDS Amiri et al., Phys. Rev. A 93, 032325 (2016);, 10.1103/PhysRevA.93.032325 Yin, Fu, and Zeng-Bing, Phys. Rev. A 93, 032316 (2016), 10.1103/PhysRevA.93.032316 shows that such schemes do not require trusted quantum channels and are unconditionally secure against general coherent attacks. However, in practical QDS, just as in quantum key distribution (QKD), the detectors can be subjected to side-channel attacks, which can make the actual implementations insecure. Motivated by the idea of measurement-device-independent quantum key distribution (MDI-QKD), we present a measurement-device-independent QDS (MDI-QDS) scheme, which is secure against all detector side-channel attacks. Based on the rapid development of practical MDI-QKD, our MDI-QDS protocol could also be experimentally implemented, since it requires a similar experimental setup.

  8. The HST Key Project on the Extragalactic Distance Scale

    Science.gov (United States)

    Freedman, W. L.

    1994-12-01

    One of the major unresolved problems in observational cosmology is the determination of the Hubble Constant, (H_0). The Hubble Space Telescope (HST) Key Project on the Extragalactic Distance Scale aims to provide a measure of H_0 to an accuracy of 10%. Historically the route to H_0 has been plagued by systematic errors; hence there is no quick and easy route to a believeable value of H_0. Achieving plausible error limits of 10% requires careful attention to eliminating potential sources of systematic error. The strategy adopted by the Key Project team is threefold: First, to discover Cepheids in spiral galaxies located in the field and in small groups that are suitable for the calibration of several independent secondary methods. Second, to make direct Cepheid measurements of 3 spiral galaxies in the Virgo cluster and 2 members of the Fornax cluster. Third, to provide a check on the the Cepheid distance scale via independent distance estimates to nearby galaxies, and in addition, to undertake an empirical test of the sensitivity of the zero point of the Cepheid PL relation to heavy-element abundances. First results from the HST Key Project will be presented. We have now determined Cepheid distances to 4 galaxies using the HST: these are the nearby galaxies M81 and M101, the edge-on galaxy NGC 925, and the face-on spiral galaxy M100 in the Virgo cluster. Recently we have measured a Cepheid distance for M100 of 17 +/- 2 Mpc, which yields a value of H_0 = 80 +/- 17 km/sec/Mpc. This work was carried out in collaboration with the other members of the HST Key Project team, R. Kennicutt, J. Mould, F. Bresolin, S. Faber, L. Ferrarese, H. Ford, J. Graham, J. Gunn, M. Han, P. Harding, J. Hoessel, R. Hill, J. Huchra, S. Hughes, G. Illingworth, D. Kelson, B. Madore, R. Phelps, A. Saha, N. Silbermann, P. Stetson, and A. Turner.

  9. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  10. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  11. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  12. Basic Project Management Methodologies for Survey Researchers.

    Science.gov (United States)

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  13. Full data consistency conditions for cone-beam projections with sources on a plane

    International Nuclear Information System (INIS)

    Clackdoyle, Rolf; Desbat, Laurent

    2013-01-01

    Cone-beam consistency conditions (also known as range conditions) are mathematical relationships between different cone-beam projections, and they therefore describe the redundancy or overlap of information between projections. These redundancies have often been exploited for applications in image reconstruction. In this work we describe new consistency conditions for cone-beam projections whose source positions lie on a plane. A further restriction is that the target object must not intersect this plane. The conditions require that moments of the cone-beam projections be polynomial functions of the source positions, with some additional constraints on the coefficients of the polynomials. A precise description of the consistency conditions is that the four parameters of the cone-beam projections (two for the detector, two for the source position) can be expressed with just three variables, using a certain formulation involving homogeneous polynomials. The main contribution of this work is our demonstration that these conditions are not only necessary, but also sufficient. Thus the consistency conditions completely characterize all redundancies, so no other independent conditions are possible and in this sense the conditions are full. The idea of the proof is to use the known consistency conditions for 3D parallel projections, and to then apply a 1996 theorem of Edholm and Danielsson that links parallel to cone-beam projections. The consistency conditions are illustrated with a simulation example. (paper)

  14. 7 CFR 1720.12 - Reporting requirements.

    Science.gov (United States)

    2010-01-01

    ... year end: (1) Consolidated financial statements and accompanying footnotes, audited by independent... conduct such a review; (3) Pro forma projection of the guaranteed lender's balance sheet, income statement, and statement of cash flows over the ensuing five years; (4) Credit assessment issued by a Rating...

  15. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  16. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  17. Modelling of risk events with uncertain likelihoods and impacts in large infrastructure projects

    DEFF Research Database (Denmark)

    Schjær-Jacobsen, Hans

    2010-01-01

    to prevent future budget overruns. One of the central ideas is to introduce improved risk management processes and the present paper addresses this particular issue. A relevant cost function in terms of unit prices and quantities is developed and an event impact matrix with uncertain impacts from independent......This paper presents contributions to the mathematical core of risk and uncertainty management in compliance with the principles of New Budgeting laid out in 2008 by the Danish Ministry of Transport to be used in large infrastructure projects. Basically, the new principles are proposed in order...... uncertain risk events is used to calculate the total uncertain risk budget. Cost impacts from the individual risk events on the individual project activities are kept precisely track of in order to comply with the requirements of New Budgeting. Additionally, uncertain likelihoods for the occurrence of risk...

  18. Chandra Independently Determines Hubble Constant

    Science.gov (United States)

    2006-08-01

    light years from Earth. These results do not rely on the traditional distance ladder. Bonamente and his colleagues find the Hubble constant to be 77 kilometers per second per megaparsec (a megaparsec is equal to 3.26 million light years), with an uncertainty of about 15%. This result agrees with the values determined using other techniques. The Hubble constant had previously been found to be 72, give or take 8, kilometers per second per megaparsec based on Hubble Space Telescope observations. The new Chandra result is important because it offers the independent confirmation that scientists have been seeking and fixes the age of the Universe between 12 and 14 billion years. Chandra X-ray Image of CL J1226.9+3332 Chandra X-ray Image of CL J1226.9+3332 "These new results are entirely independent of all previous methods of measuring the Hubble constant," said team member Marshall Joy also of MSFC. The astronomers used a phenomenon known as the Sunyaev-Zeldovich effect, where photons in the cosmic microwave background (CMB) interact with electrons in the hot gas that pervades the enormous galaxy clusters. The photons acquire energy from this interaction, which distorts the signal from the microwave background in the direction of the clusters. The magnitude of this distortion depends on the density and temperature of the hot electrons and the physical size of the cluster. Using radio telescopes to measure the distortion of the microwave background and Chandra to measure the properties of the hot gas, the physical size of the cluster can be determined. From this physical size and a simple measurement of the angle subtended by the cluster, the rules of geometry can be used to derive its distance. The Hubble constant is determined by dividing previously measured cluster speeds by these newly derived distances. Chandra X-ray Image of Abell 1689 Chandra X-ray Image of Abell 1689 This project was championed by Chandra's telescope mirror designer, Leon Van Speybroeck, who passed

  19. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  20. On patterns of conditional independences and covariance signs among binary variables

    Czech Academy of Sciences Publication Activity Database

    Matúš, František

    Roč. 154, č. 2 ( 2018 ), s. 511-524 ISSN 0236-5294 R&D Projects: GA ČR(CZ) GA16-12010S Institutional support: RVO:67985556 Keywords : conditional independence * covariance * correlation Subject RIV: BA - General Mathematics OBOR OECD: Statistics and probability Impact factor: 0.583, year: 2016 http://library.utia.cas.cz/separaty/ 2018 /MTR/matus-0488279.pdf

  1. Independent Verification Survey Report for the Operable Unit-1 Landfill Miamisburg Closure Project, Miamisburg, OH

    International Nuclear Information System (INIS)

    Weaver, P.

    2008-01-01

    The objectives of the independent verification survey were to confirm that remedial actions have been effective in meeting established release criteria and that documentation accurately and adequately describes the current radiological and chemical conditions of the MCP site

  2. Parallel Device-Independent Quantum Key Distribution

    OpenAIRE

    Jain, Rahul; Miller, Carl A.; Shi, Yaoyun

    2017-01-01

    A prominent application of quantum cryptography is the distribution of cryptographic keys with unconditional security. Recently, such security was extended by Vazirani and Vidick (Physical Review Letters, 113, 140501, 2014) to the device-independent (DI) scenario, where the users do not need to trust the integrity of the underlying quantum devices. The protocols analyzed by them and by subsequent authors all require a sequential execution of N multiplayer games, where N is the security parame...

  3. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  4. Bayesian conditional-independence modeling of the AIDS epidemic in England and Wales

    Science.gov (United States)

    Gilks, Walter R.; De Angelis, Daniela; Day, Nicholas E.

    We describe the use of conditional-independence modeling, Bayesian inference and Markov chain Monte Carlo, to model and project the HIV-AIDS epidemic in homosexual/bisexual males in England and Wales. Complexity in this analysis arises through selectively missing data, indirectly observed underlying processes, and measurement error. Our emphasis is on presentation and discussion of the concepts, not on the technicalities of this analysis, which can be found elsewhere [D. De Angelis, W.R. Gilks, N.E. Day, Bayesian projection of the the acquired immune deficiency syndrome epidemic (with discussion), Applied Statistics, in press].

  5. Definition and specification for PACS. A checklist based on the standard ''IEEE Recommended Practice for Software Requirements Specifications''

    International Nuclear Information System (INIS)

    Koenig, H.; Klose, K.J.

    1999-01-01

    Problem: The formulation of requirements is necessary to control the goals of a PACS project. Furthermore, in this way, the scope of functionality necessary to support radiological working processes becomes clear. Method: Definitions of requirements and specification are formulated independently of systems according to the IEEE standard 'Recommended Practice for Software Requirements Specifications'. Definitions are given in the Request for Information, specifications in the Request for Proposal. Functional and non-functional requirements are distinguished. The solutions are rated with respect to scope, appropriateness and quality of implementation. Results: A PACS checklist was created according to the methods described above. It is published on the homepage of the 'Arbeitsgemeinschaft Informationstechnologie' (AGIT) within the 'Deutsche Roentgengesellschaft' (DRG) (http://www.uni-marburg.de/mzr.agit). Conclusion: The checklist provides a discussion forum which should contribute to an agreement on accepted basic PACS functionalities. (orig.) [de

  6. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    over which developers and financiers will be most focused over the development process. The concept of a power station for which the fuel is entirely free is attractive. However, this advantage is balanced by the variability of the wind which, to the uninitiated, may make an investment in such a scheme appear highly risky. In order to assess the energy production of a wind farm over the project life, it is necessary to determine accurately the long-term mean wind speed at a potential site. The prediction of energy production of a wind farm is dependent on many inputs for which the uncertainties can be objectively defined. This area therefore lends itself to a statistical assessment of the risks associated with a project. The wind analyst will review the uncertainties associated with the assessment and will obtain a 'standard deviation' for the analysis that can be applied to the central estimate. Based upon GH experience, where appropriate wind measurements have been made and diligently analysed and wind turbines with a good track record are used, it is likely that the 10-year 90% exceeding level (P90) for the wind farm production will be of the order of 10% to 15% below the central estimate (P50) of energy production for the wind farm. It is typical for an Operation and Management contract to be let to the turbine supplier for the duration of the defects liability period. Where the initial warranty period is only 2 years in term, the service period may extend to 5 years and cover unscheduled maintenance (repair) as well as routine servicing. Project Life Modern wind turbines are typically designed to be suitable for use within a specific envelope of climatic conditions over a 20 year design life. This lifetime assumption is generally supported by independent certification by a classification society such as Germanischer Lloyd or Det Norske Veritas, which has the primary purpose of ensuring that a design is compliant with specific safety requirements. Despite

  7. Quantifying requirements volatility effects

    NARCIS (Netherlands)

    Kulk, G.P.; Verhoef, C.

    2008-01-01

    In an organization operating in the bancassurance sector we identified a low-risk IT subportfolio of 84 IT projects comprising together 16,500 function points, each project varying in size and duration, for which we were able to quantify its requirements volatility. This representative portfolio

  8. Project financing versus corporate financing under asymmetric information

    OpenAIRE

    Anton Miglo

    2008-01-01

    In recent years financing through the creation of an independent project company or financing by non-recourse debt has become an important part of corporate decisions. Shah and Thakor (JET, 1987) argue that project financing can be optimal when asymmetric information exists between firm's insiders and market participants. In contrast to that paper, we provide an asymmetric information argument for project financing without relying on corporate taxes, costly information production or an assump...

  9. All projects related to Tanzania | Page 5 | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2009-07-02

    Project. The Economic and Social Research Foundation (ESRF) is an independent research organization that was registered in Tanzania in October 1992. Start Date: July 2, 2009 ... Five-City Network to Pioneer Climate Change Adaptation in sub-Saharan Africa. Project ... Program: Governance and Justice. Total Funding: ...

  10. Deer Island Aquatic Ecosystem Restoration Project

    Science.gov (United States)

    2015-07-01

    across the U.S. Army Corps of Engineers (USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic...USACE) requires that a broad base of EWN understanding and support be built . The Deer Island Aquatic Ecosystem Restoration Project (Deer Island AERP...Mississippi Wetlands Restoration Projects). The project received additional funding through several public laws in response to hurricane damages

  11. Single-donor islet transplantation and long-term insulin independence in select patients with type 1 diabetes mellitus.

    Science.gov (United States)

    Al-Adra, David P; Gill, Richdeep S; Imes, Sharleen; O'Gorman, Doug; Kin, Tatsuya; Axford, Sara J; Shi, Xinzhe; Senior, Peter A; Shapiro, A M James

    2014-11-15

    Islet transplantation is a recognized treatment option for select patients with type I diabetes mellitus. However, islet infusions from multiple donors are often required to achieve insulin independence. Ideally, insulin independence would be achieved routinely with only a single donor. Identification of factors associated with insulin independence after single-donor islet transplantation may help to select recipient-donor combinations with the highest probability of success. Subjects undergoing islet transplantation at a single center (Edmonton, Canada) between March 1999 and August 2013 were included. Recipient, donor, and transplant characteristics were collected and compared between recipients who became insulin independent after one islet transplantation and those who did not. Thirty-one patients achieved insulin independence after a single-donor islet transplantation, and 149 did not. Long-term insulin-free survival was not different between the groups. Factors significantly associated with single-donor success included recipient age, insulin requirement at baseline, donor weight, donor body mass index, islet transplant mass, and peritransplant heparin and insulin administration. On multivariate analysis, pretransplantation daily insulin requirements, the use of peritransplantation heparin and insulin infusions, and islet transplant mass remained significant. We have identified clinically relevant differences defining the achievement of insulin independence after single-donor transplantation. Based on these differences, a preoperative insulin requirement of less than 0.6 U/kg per day and receiving more than 5,646 islet equivalents (IEQ)/kg have a sensitivity of 84% and 71% and specificity of 50% and 50%, respectively, for insulin independence after single-donor islet transplantation. With ideal patient selection, this finding could potentially increase single-donor transplantation success and may be especially relevant for presensitized subjects or those who

  12. PIT Coating Requirements Analysis

    International Nuclear Information System (INIS)

    MINTEER, D.J.

    2000-01-01

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products

  13. PIT Coating Requirements Analysis

    Energy Technology Data Exchange (ETDEWEB)

    MINTEER, D.J.

    2000-10-20

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

  14. Experiences Gained from Independent Assessment in Licensing of Advanced I and C Systems in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lindner, Arndt B.; Wach, Dieter H.

    2003-01-01

    Operational benefits and enlarged functionality of modern technology, but also the physical and the technological aging of conventional instrumentation and control (I and C) systems, are motivations for modernization of I and C systems in nuclear power plants (NPPs). In case of safety-relevant I and C systems, the licensing authorities require the demonstration of sufficient safety of the systems.In several countries ongoing research and development projects are directed to provide a scientific basis and engineering solutions for cost-effective assessment of software-based I and C systems important to safety in NPPs. International initiatives have been started to develop a harmonized safety assessment methodology. The Institute for Safety Technology (ISTec) has been engaged in national and international programs as well as in establishing a two-phase qualification approach, which comprises a generic plant-independent qualification of hardware and software components and a plant-specific system qualification phase.In both generic qualification and plant-specific system qualification, ISTec has been involved as an independent third-party assessor for the relevant state authority. This paper reports experiences from the ISTec involvement in the assessment projects, e.g., in the assessment of the I and C important to safety in the new German High-Flux Research Reactor (FRM-2) in Munich and in the assessments of I and C modernization in NPPs of foreign countries (Bohunice, Slovak Republic; Paks, Hungary; and others). Conclusions are drawn from the experiences with respect to the practicability of the two-phase qualification concept and from the major findings in the plant-specific I and C assessments

  15. Dimension-Independent Likelihood-Informed MCMC

    KAUST Repository

    Cui, Tiangang; Law, Kody; Marzouk, Youssef

    2015-01-01

    Many Bayesian inference problems require exploring the posterior distribution of high-dimensional parameters, which in principle can be described as functions. By exploiting low-dimensional structure in the change from prior to posterior [distributions], we introduce a suite of MCMC samplers that can adapt to the complex structure of the posterior distribution, yet are well-defined on function space. Posterior sampling in nonlinear inverse problems arising from various partial di erential equations and also a stochastic differential equation are used to demonstrate the e ciency of these dimension-independent likelihood-informed samplers.

  16. Dimension-Independent Likelihood-Informed MCMC

    KAUST Repository

    Cui, Tiangang

    2015-01-07

    Many Bayesian inference problems require exploring the posterior distribution of high-dimensional parameters, which in principle can be described as functions. By exploiting low-dimensional structure in the change from prior to posterior [distributions], we introduce a suite of MCMC samplers that can adapt to the complex structure of the posterior distribution, yet are well-defined on function space. Posterior sampling in nonlinear inverse problems arising from various partial di erential equations and also a stochastic differential equation are used to demonstrate the e ciency of these dimension-independent likelihood-informed samplers.

  17. Multi Canister Overpack (MCO) Handling Machine - Independent Review of Seismic Structural Analysis

    International Nuclear Information System (INIS)

    SWENSON, C.E.

    2000-01-01

    The following separate reports and correspondence pertains to the independent review of the seismic analysis. The original analysis was performed by GEC-Alsthom Engineering Systems Limited (GEC-ESL) under subcontract to Foster-Wheeler Environmental Corporation (FWEC) who was the prime integration contractor to the Spent Nuclear Fuel Project for the Multi-Canister Overpack (MCO) Handling Machine (MHM). The original analysis was performed to the Design Basis Earthquake (DBE) response spectra using 5% damping as required in specification, HNF-S-0468 for the 90% Design Report in June 1997. The independent review was performed by Fluor-Daniel (Irvine) under a separate task from their scope as Architect-Engineer of the Canister Storage Building (CSB) in 1997. The comments were issued in April 1998. Later in 1997, the response spectra of the Canister Storage Building (CSB) was revised according to a new soil-structure interaction analysis and accordingly revised the response spectra for the MHM and utilized 7% damping in accordance with American Society of Mechanical Engineers (ASME) NOG-1, ''Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder).'' The analysis was re-performed to check critical areas but because manufacturing was underway, designs were not altered unless necessary. FWEC responded to SNF Project correspondence on the review comments in two separate letters enclosed. The dispositions were reviewed and accepted. Attached are supplier source surveillance reports on the procedures and process by the engineering group performing the analysis and structural design. All calculation and analysis results are contained in the MHM Final Design Report which is part of the Vendor Information File 50100. Subsequent to the MHM supplier engineering analysis, there was a separate analyses for nuclear safety accident concerns that used the electronic input data files provided by FWEC/GEC-ESL and are contained in document SNF-6248

  18. Multi Canister Overpack (MCO) Handling Machine Independent Review of Seismic Structural Analysis

    Energy Technology Data Exchange (ETDEWEB)

    SWENSON, C.E.

    2000-09-22

    The following separate reports and correspondence pertains to the independent review of the seismic analysis. The original analysis was performed by GEC-Alsthom Engineering Systems Limited (GEC-ESL) under subcontract to Foster-Wheeler Environmental Corporation (FWEC) who was the prime integration contractor to the Spent Nuclear Fuel Project for the Multi-Canister Overpack (MCO) Handling Machine (MHM). The original analysis was performed to the Design Basis Earthquake (DBE) response spectra using 5% damping as required in specification, HNF-S-0468 for the 90% Design Report in June 1997. The independent review was performed by Fluor-Daniel (Irvine) under a separate task from their scope as Architect-Engineer of the Canister Storage Building (CSB) in 1997. The comments were issued in April 1998. Later in 1997, the response spectra of the Canister Storage Building (CSB) was revised according to a new soil-structure interaction analysis and accordingly revised the response spectra for the MHM and utilized 7% damping in accordance with American Society of Mechanical Engineers (ASME) NOG-1, ''Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder).'' The analysis was re-performed to check critical areas but because manufacturing was underway, designs were not altered unless necessary. FWEC responded to SNF Project correspondence on the review comments in two separate letters enclosed. The dispositions were reviewed and accepted. Attached are supplier source surveillance reports on the procedures and process by the engineering group performing the analysis and structural design. All calculation and analysis results are contained in the MHM Final Design Report which is part of the Vendor Information File 50100. Subsequent to the MHM supplier engineering analysis, there was a separate analyses for nuclear safety accident concerns that used the electronic input data files provided by FWEC/GEC-ESL and are contained in

  19. Projections of costs, financing, and additional resource requirements for low- and lower middle-income country immunization programs over the decade, 2011-2020.

    Science.gov (United States)

    Gandhi, Gian; Lydon, Patrick; Cornejo, Santiago; Brenzel, Logan; Wrobel, Sandra; Chang, Hugh

    2013-04-18

    The Decade of Vaccines Global Vaccine Action Plan has outlined a set of ambitious goals to broaden the impact and reach of immunization across the globe. A projections exercise has been undertaken to assess the costs, financing availability, and additional resource requirements to achieve these goals through the delivery of vaccines against 19 diseases across 94 low- and middle-income countries for the period 2011-2020. The exercise draws upon data from existing published and unpublished global forecasts, country immunization plans, and costing studies. A combination of an ingredients-based approach and use of approximations based on past spending has been used to generate vaccine and non-vaccine delivery costs for routine programs, as well as supplementary immunization activities (SIAs). Financing projections focused primarily on support from governments and the GAVI Alliance. Cost and financing projections are presented in constant 2010 US dollars (US$). Cumulative total costs for the decade are projected to be US$57.5 billion, with 85% for routine programs and the remaining 15% for SIAs. Delivery costs account for 54% of total cumulative costs, and vaccine costs make up the remainder. A conservative estimate of total financing for immunization programs is projected to be $34.3 billion over the decade, with country governments financing 65%. These projections imply a cumulative funding gap of $23.2 billion. About 57% of the total resources required to close the funding gap are needed just to maintain existing programs and scale up other currently available vaccines (i.e., before adding in the additional costs of vaccines still in development). Efforts to mobilize additional resources, manage program costs, and establish mutual accountability between countries and development partners will all be necessary to ensure the goals of the Decade of Vaccines are achieved. Establishing or building on existing mechanisms to more comprehensively track resources and

  20. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  1. Angle-independent measure of motion for image-based gating in 3D coronary angiography

    International Nuclear Information System (INIS)

    Lehmann, Glen C.; Holdsworth, David W.; Drangova, Maria

    2006-01-01

    The role of three-dimensional (3D) image guidance for interventional procedures and minimally invasive surgeries is increasing for the treatment of vascular disease. Currently, most interventional procedures are guided by two-dimensional x-ray angiography, but computed rotational angiography has the potential to provide 3D geometric information about the coronary arteries. The creation of 3D angiographic images of the coronary arteries requires synchronization of data acquisition with respect to the cardiac cycle, in order to minimize motion artifacts. This can be achieved by inferring the extent of motion from a patient's electrocardiogram (ECG) signal. However, a direct measurement of motion (from the 2D angiograms) has the potential to improve the 3D angiographic images by ensuring that only projections acquired during periods of minimal motion are included in the reconstruction. This paper presents an image-based metric for measuring the extent of motion in 2D x-ray angiographic images. Adaptive histogram equalization was applied to projection images to increase the sharpness of coronary arteries and the superior-inferior component of the weighted centroid (SIC) was measured. The SIC constitutes an image-based metric that can be used to track vessel motion, independent of apparent motion induced by the rotational acquisition. To evaluate the technique, six consecutive patients scheduled for routine coronary angiography procedures were studied. We compared the end of the SIC rest period (ρ) to R-waves (R) detected in the patient's ECG and found a mean difference of 14±80 ms. Two simultaneous angular positions were acquired and ρ was detected for each position. There was no statistically significant difference (P=0.79) between ρ in the two simultaneously acquired angular positions. Thus we have shown the SIC to be independent of view angle, which is critical for rotational angiography. A preliminary image-based gating strategy that employed the SIC was

  2. PENGARUH STRATEGI PROJECT BASED LEARNING (PJBL TERHADAP KEMAMPUAN BERPIKIR KRITIS SISWA KELAS XI IPA PADA MATERI KOLOID

    Directory of Open Access Journals (Sweden)

    Nur Hikmah

    2016-11-01

    Full Text Available The 21st century education aims to develop the ability of intelligence of students in order to resolve the problems faced in real life. Project-Based Learning is one instructional strategies to develop the skills required in the 21st century. Through a given project, students are not only required to achieve the learning objectives that have been set, but students will be trained to face the world of work that requires their ability to access, mesintesis, communicating information, and work together to solve complex problems so as to improve the ability of students critical thinking. This research is a quasi-experimental research (quasy experiment with posttest only control group design. This research aims to determine the influence of Project Based Learning Strategy (PjBL to the critical thinking skills of students of class XI IPA at SMAN 1 Malua on colloidal material. The research population includes students of class XI IPA at SMAN 1 Malua, with random cluster sampling technique sampling. Data were analyzed using independent sample t-test in SPSS 20 for windows at the 0.05 level of significance. The result showed that the significance level of critical thinking skills of 0.001 which indicates that there are differences between students' critical thinking skills that learned using a strategy of Project Based Learning (PjBL with students that learned using conventional methods. Pendidikan abad 21 bertujuan untuk membangun kemampuan intelegensi siswa dalam pembelajaran agar mampu menyelesaikan permasalahan yang dihadapi. salah satu strategi pembelaj aran di abad 21 yang mengembangkan keterampilan siswa ialah Project Based Learning. Melalui proyek yang diberikan, siswa tidak hanya dituntut untuk mencapai tujuan pembelajaran yang telah ditetapkan, tetapi siswa akan lebih terlatih menghadapi dunia kerja yang membutuhkan kemampuan mereka dalam mengakses, mesintesis, mengomunikasikan infomasi, dan bekerja sama memecahkan masalah yang kompleks

  3. High performance message passing for the ATLAS DAQ/EF-1 project

    CERN Document Server

    Mornacchi, Giuseppe

    1999-01-01

    Summary form only. A message passing library has been developed in the context of the ATLAS DAQ/EF-1 project. It is used for time critical applications within the front-end part of the DAQ system, mainly to exchange data control messages between I/O processors. Key objectives of the design were low message overheads, efficient use of the data transfer buses, provision of broadcast functionality and a hardware and operating system independent implementation of the application interface. The design and implementation of the message passing library are presented. As required by the project, the implementation is based on commercial components, namely VMEbus, PCI, the Lynx-OS real-time operating system and an additional inter- processor link, PVIC. The latter offers broadcast functionality identified as being important to the overall performance of the message passing. In addition, performance benchmarks for all implementing buses are presented for both simple test programs and the full DAQ applications. (0 refs)...

  4. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  5. Sustainable network of independent technical expertise for radioactive waste disposal

    International Nuclear Information System (INIS)

    Serres, Christophe; Rocher, Muriel; Lemy, Frank; Havlova, Vaclava; Mrskova, Adela; Heriard Dubreuil, Gilles

    2014-01-01

    Full text of publication follows: SITEX is a 24-month FP7 project led by IRSN and bringing together 15 organisations representing technical safety organisations (TSO) and safety authorities, as well as civil society outreach specialists involved in the 'regulatory' review process of geological disposal of radioactive waste. SITEX aims at establishing the conditions required for developing a sustainable network of experts from various horizons (authorities, TSO, academic organisations, civil society,...) capable of developing and coordinating the technical expertise that is required from the stakeholders in charge of delivering opinion, independently from the waste management organisations (WMO), on the safety of geological disposals. The SITEX programme of work is split into a set of six work packages that address technical and organisational issues allowing to propose a structure of the missions and operating mode of the future network. These issues relate on the one hand to the study of the potential for sharing and developing technical expertise practices amongst stakeholders, on the other hand on the ability to implement co-ordinated R and D programmes run by TSO in order to develop the scientific knowledge necessary to perform independent technical assessments. Two major perspectives are identified for the future of the SITEX network: its ability to foster co-operation between regulatory bodies, TSO, implementers and civil society with a view to enhancing common understanding of key safety issues and challenges and to identifying possible harmonisation of practices; the constitution of a scientific task force (mainly driven by TSO) for research definition and implementation at the European level allowing to improve the co-ordination of scientific programmes between TSO and developing its own skills and analytical tools, independently of the WMO. A comprehensive list of safety issues relevant to the development and implementation of a geological repository has

  6. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  7. Effects of climate model interdependency on the uncertainty quantification of extreme reinfall projections

    DEFF Research Database (Denmark)

    Sunyer Pinya, Maria Antonia; Madsen, H.; Rosbjerg, Dan

    are independent. This study investigates the validity of this assumption and its effects on the estimated probabilistic projections of the changes in the 95% quantile of wet days. The methodology is divided in two main parts. First, the interdependency of the ENSEMBLES RCMs is estimated using the methodology...... developed by Pennell and Reichler (2011). The results show that the projections from the ENSEMBLES RCMs cannot be assumed independent. This result is then used to estimate the uncertainty in climate model projections. A Bayesian approach has been developed using the procedure suggested by Tebaldi et al...

  8. Effects of climate model interdependency on the uncertainty quantification of extreme rainfall projections

    DEFF Research Database (Denmark)

    Sunyer, M. A.; Rosbjerg, Dan; Arnbjerg-Nielsen, Karsten

    2017-01-01

    are independent. This study investigates the validity of this assumption and its effects on the estimated probabilistic projections of the changes in the 95% quantile of wet days. The methodology is divided in two main parts. First, the interdependency of the ENSEMBLES RCMs is estimated using the methodology...... developed by Pennell and Reichler (2011). The results show that the projections from the ENSEMBLES RCMs cannot be assumed independent. This result is then used to estimate the uncertainty in climate model projections. A Bayesian approach has been developed using the procedure suggested by Tebaldi et al...

  9. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  10. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  11. Science Roles and Interactions in Adaptive Management of Large River Restoration Projects, Midwest United States

    Science.gov (United States)

    Jacobson, R. B.; Galat, D. L.; Smith, C. B.

    2010-12-01

    Most large-river restoration projects include formal or informal implementations of adaptive management strategies which acknowledge uncertainty and use scientific inquiry to learn and refine management options. Although the central role of science in reducing uncertainty is acknowledged in such projects, specific roles and interactions can vary widely, including how science relates to decision-making within the governance of these projects. Our objective is to present some structured generalizations about science roles and interactions as developed from the authors’ experiences in adaptive management of large river restoration in the Midwest United States. Scientific information may be introduced into decision making by scientists acting in any of the three roles common to adaptive management -- action agency representative, stakeholder, or science provider. We have observed that confusion and gridlock can arise when it is unclear if a scientist is acting as an advocate for a stakeholder or management position, or instead as an independent, “honest broker” of science. Although both advocacy and independence are proper and expected in public decision making, it is useful when scientists unambiguously identify their role. While complete scientific independence may be illusory, transparency and peer review can promote the ideal. Transparency comes from setting clear directions and objectives at the decision-making level and defining at the outset how learning will help assess progress and inform decisions. Independent peer reviews of proposals, study plans, and publications serve as a powerful tool to advance scientific independence, even if funding sources present a potential conflict of interest. Selection of experts for scientific advice and review often requires consideration of the balance between benefits of the “outside” expert (independent, knowledgeable but with little specific understanding of the river system), compared to those provided by the

  12. On the independence of axioms in BL and MTL

    Czech Academy of Sciences Publication Activity Database

    Chvalovský, Karel

    2012-01-01

    Roč. 197, 16 June (2012), s. 123-129 ISSN 0165-0114 R&D Projects: GA ČR GEICC/08/E018; GA ČR GD401/09/H007 Grant - others:GA UK(CZ) 73109/2009 Institutional research plan: CEZ:AV0Z10300504 Keywords : non-classical logics * basic fuzzy logic (BL) * monoidal t-norm based logic (MTL) * Hilbert-style calculi * independence of axioms Subject RIV: BA - General Mathematics Impact factor: 1.749, year: 2012

  13. Police Contact with People with an Intellectual Disability: The Independent Third Person Perspective

    Science.gov (United States)

    Spivak, B. L.; Thomas, S. D. M.

    2013-01-01

    Background: A number of jurisdictions have instituted legislation requiring an independent person to be present during police interviews with vulnerable people. In Victoria, Australia, a group of volunteers known as Independent Third Persons help to fulfil this role with people who present with cognitive impairment arising from their mental…

  14. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  15. Central Bank independence

    Directory of Open Access Journals (Sweden)

    Vasile DEDU

    2012-08-01

    Full Text Available In this paper we present the key aspects regarding central bank’s independence. Most economists consider that the factor which positively influences the efficiency of monetary policy measures is the high independence of the central bank. We determined that the National Bank of Romania (NBR has a high degree of independence. NBR has both goal and instrument independence. We also consider that the hike of NBR’s independence played an important role in the significant disinflation process, as headline inflation dropped inside the targeted band of 3% ± 1 percentage point recently.

  16. Bibliographic information interchange with data independence

    International Nuclear Information System (INIS)

    Macedo, L.F.P. de

    1980-01-01

    A technique for bibliographic information processing, at the standardized interchange format ISO 2709 or ANSI Z39.2, which allows to obtain programs with data independence is developed. A format definition language and manipulation commands which enable data storage and retrieval at the logical level are specified. With this technique it is possible to implement programs which can accept data from any information system, reducing, therefore, the requirements of a common bibliographic information interchange format. (Author) [pt

  17. Every Day We're Shufflin': Empowering Students during In-School Independent Reading

    Science.gov (United States)

    Hall, Katrina W.; Hedrick, Wanda B.; Williams, Lunetta M.

    2014-01-01

    Research in the field of literacy has identified choice as a key component affecting students' reading habits and their resulting literacy growth. This article discusses an in-school independent reading project in which students are provided the freedom to choose books, use ambient music, and engage in book talks. The children showed increased…

  18. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    Energy Technology Data Exchange (ETDEWEB)

    Russo, Bryan J.; Chvala, William D.

    2010-09-30

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  19. On the Sequencing of Projects, Reputation Building and Relationship Finance

    NARCIS (Netherlands)

    Egli, D.; Ongena, S.; Smith, D.C.

    2001-01-01

    We study the decision entrepreneurs face in financing multiple and independent projects.If strategic defaults are assessed likely to occur, for example if judicial efficiency is low, entrepreneurs delay projects to seek sequential financing from a relationship lender.Such commitment-type borrowing

  20. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  1. Thermodynamics and analysis of rate-independent adhesive contact at small strains

    Czech Academy of Sciences Publication Activity Database

    Rossi, R.; Roubíček, Tomáš

    2011-01-01

    Roč. 74, č. 10 (2011), s. 3159-3190 ISSN 0362-546X R&D Projects: GA ČR GAP201/10/0357 Institutional research plan: CEZ:AV0Z20760514 Keywords : adhesive contact * nonlinear heat equation * rate-independence Subject RIV: BA - General Mathematics Impact factor: 1.536, year: 2011 http://www.sciencedirect.com/science/article/pii/S0362546X11000496

  2. Associations between children’s independent mobility and physical activity

    Science.gov (United States)

    2014-01-01

    , predominantly at light intensity. Hence, facilitating independent outdoor play could be a viable intervention strategy to enhance physical activity in children, particularly in girls. Associations between independent travel and physical activity are inconsistent overall and require further investigation. PMID:24476363

  3. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  4. Top-tier requirements for KNGR

    International Nuclear Information System (INIS)

    Sung-Jae, Ch.; Kwangho, L.; Dong Wook, J.

    1996-01-01

    In 1992, Korea Electric Power Corporation (KEPCO) has launched the next generation reactor project to develop the standard design of an advanced pressurized water reactor by 2000. This advanced reactor aims to have the sufficient capability to be a safe, environmentally sound and economical energy source for 2000's in Korea. In conjunction with the project development, the program phase I is studied and it is in the Korean Next Generation Reactor (KNGR) first phase project that the requirements of this specification called ''Top-tier'' have been established. These functional requirements are of the first importance for the design, construction and operation of a nuclear power plant. These requirements are divided into safety requirements, serious accidents control, design base requirements, definition of the system characteristics, performance, construction feasibility, economical objectives, site parameters and design processes. The ''Top-tier'' requirements are concentrated on the improvement of the safety and reliability. Safety is one of the first priorities. In particular, the requirements for the design of the next reactors generation must include the capacity to control serious accidents because when an accident occurs, the protection degree is crucial. The KNGR requirements include the existing nuclear power plants competitiveness as well as those of the coal thermal plants. Moreover, when safety is reinforced, the economic competitiveness can be assured. At the present time, a subsequent specification for the KNGR considering the bases of the domestic technology and experimenting the running. (O.M.)

  5. Characterization of NMDAR-independent learning in the hippocampus.

    Directory of Open Access Journals (Sweden)

    Kaycie Kuss Tayler

    2011-05-01

    Full Text Available It is currently thought that memory formation requires the activation of NMDA receptors (NMDARs in the hippocampus. However, recent studies indicate that these receptors are not necessary for all forms of learning. The current experiments examine this issue using context fear conditioning in mice. First, we show that context fear can be acquired without NMDAR activation in previously trained animals. Mice trained in one environment (context A are subsequently able to learn about a second environment (context B in the presence of NMDAR antagonists. Second, we demonstrate that NMDAR-independent learning requires the hippocampus and is dependent on protein synthesis. However, unlike NMDAR-dependent learning, it is not contingent on the expression of activity-regulated cytoskeleton-associated protein (Arc. Lastly, we present data that suggests NMDAR-independent learning is only observed when recently stimulated neurons are re-activated during conditioning. These data suggest that context fear conditioning modifies synaptic plasticity mechanisms in the hippocampus and allows subsequent learning to occur in the absence of NMDAR activation.

  6. TGF-β receptors, in a Smad-independent manner, are required for terminal skeletal muscle differentiation

    International Nuclear Information System (INIS)

    Droguett, Rebeca; Cabello-Verrugio, Claudio; Santander, Cristian; Brandan, Enrique

    2010-01-01

    Skeletal muscle differentiation is strongly inhibited by transforming growth factor type β (TGF-β), although muscle formation as well as regeneration normally occurs in an environment rich in this growth factor. In this study, we evaluated the role of intracellular regulatory Smads proteins as well as TGF-β-receptors (TGF-β-Rs) during skeletal muscle differentiation. We found a decrease of TGF-β signaling during differentiation. This phenomenon is explained by a decline in the levels of the regulatory proteins Smad-2, -3, and -4, a decrease in the phosphorylation of Smad-2 and lost of nuclear translocation of Smad-3 and -4 in response to TGF-β. No change in the levels and inhibitory function of Smad-7 was observed. In contrast, we found that TGF-β-R type I (TGF-β-RI) and type II (TGF-β-RII) increased on the cell surface during skeletal muscle differentiation. To analyze the direct role of the serine/threonine kinase activities of TGF-β-Rs, we used the specific inhibitor SB 431542 and the dominant-negative form of TGF-β-RII lacking the cytoplasmic domain. The TGF-β-Rs were important for successful muscle formation, determined by the induction of myogenin, creatine kinase activity, and myosin. Silencing of Smad-2/3 expression by specific siRNA treatments accelerated myogenin, myosin expression, and myotube formation; although when SB 431542 was present inhibition in myosin induction and myotube formation was observed, suggesting that these last steps of skeletal muscle differentiation require active TGF-β-Rs. These results suggest that both down-regulation of Smad regulatory proteins and cell signaling through the TGF-β receptors independent of Smad proteins are essential for skeletal muscle differentiation.

  7. TGF-{beta} receptors, in a Smad-independent manner, are required for terminal skeletal muscle differentiation

    Energy Technology Data Exchange (ETDEWEB)

    Droguett, Rebeca; Cabello-Verrugio, Claudio; Santander, Cristian [Centro de Regulacion Celular y Patologia, Centro de Regeneracion y Envejecimiento (CARE), Departamento de Biologia Celular y Molecular, MIFAB, Pontificia Universidad Catolica de Chile, Santiago (Chile); Brandan, Enrique, E-mail: ebrandan@bio.puc.cl [Centro de Regulacion Celular y Patologia, Centro de Regeneracion y Envejecimiento (CARE), Departamento de Biologia Celular y Molecular, MIFAB, Pontificia Universidad Catolica de Chile, Santiago (Chile)

    2010-09-10

    Skeletal muscle differentiation is strongly inhibited by transforming growth factor type {beta} (TGF-{beta}), although muscle formation as well as regeneration normally occurs in an environment rich in this growth factor. In this study, we evaluated the role of intracellular regulatory Smads proteins as well as TGF-{beta}-receptors (TGF-{beta}-Rs) during skeletal muscle differentiation. We found a decrease of TGF-{beta} signaling during differentiation. This phenomenon is explained by a decline in the levels of the regulatory proteins Smad-2, -3, and -4, a decrease in the phosphorylation of Smad-2 and lost of nuclear translocation of Smad-3 and -4 in response to TGF-{beta}. No change in the levels and inhibitory function of Smad-7 was observed. In contrast, we found that TGF-{beta}-R type I (TGF-{beta}-RI) and type II (TGF-{beta}-RII) increased on the cell surface during skeletal muscle differentiation. To analyze the direct role of the serine/threonine kinase activities of TGF-{beta}-Rs, we used the specific inhibitor SB 431542 and the dominant-negative form of TGF-{beta}-RII lacking the cytoplasmic domain. The TGF-{beta}-Rs were important for successful muscle formation, determined by the induction of myogenin, creatine kinase activity, and myosin. Silencing of Smad-2/3 expression by specific siRNA treatments accelerated myogenin, myosin expression, and myotube formation; although when SB 431542 was present inhibition in myosin induction and myotube formation was observed, suggesting that these last steps of skeletal muscle differentiation require active TGF-{beta}-Rs. These results suggest that both down-regulation of Smad regulatory proteins and cell signaling through the TGF-{beta} receptors independent of Smad proteins are essential for skeletal muscle differentiation.

  8. Site specific statutory compliance planning for the salt repository project at the Deaf Smith County Site, Texas: Requirements, strategy, and status: Revision 4

    International Nuclear Information System (INIS)

    1986-06-01

    This document and the requirements and actions it presents are addressed to the Deaf Smith County Site, Texas. The proposed actions upon which the plan is based are those described in Chapters 4 and 5 of the final EA for the site. Similarly, the environmental and health and safety requirements covered in the plan are those identified in the EA as being potentially applicable to the salt repository project at the Deaf Smith site. 12 figs., 8 tabs

  9. The Hyperuniverse Project and maximality

    CERN Document Server

    Friedman, Sy-David; Honzik, Radek; Ternullo, Claudio

    2018-01-01

    This collection documents the work of the Hyperuniverse Project which is a new approach to set-theoretic truth based on justifiable principles and which leads to the resolution of many questions independent from ZFC. The contributions give an overview of the program, illustrate its mathematical content and implications, and also discuss its philosophical assumptions. It will thus be of wide appeal among mathematicians and philosophers with an interest in the foundations of set theory. The Hyperuniverse Project was supported by the John Templeton Foundation from January 2013 until September 2015.

  10. Making the Long Tail Visible: Social Networking Sites and Independent Music Discovery

    Science.gov (United States)

    Gaffney, Michael; Rafferty, Pauline

    2009-01-01

    Purpose: The purpose of this paper is to investigate users' knowledge and use of social networking sites and folksonomies to discover if social tagging and folksonomies, within the area of independent music, aid in its information retrieval and discovery. The sites examined in this project are MySpace, Lastfm, Pandora and Allmusic. In addition,…

  11. ICT services for active ageing and independent living: identification and assessment.

    Science.gov (United States)

    Christophorou, Christophoros; Kleanthous, Styliani; Georgiadis, Dimosthenis; Cereghetti, Donato M; Andreou, Panayiotis; Wings, Cindy; Christodoulou, Eleni; Samaras, George

    2016-09-01

    Based on the demographic changes and the rapid increase of older population in Europe, major challenges are expected to rise, both in the economy as well as the society, whether the dominant care model for supporting elderly in living independently at home continues to rely on informal and formal caregivers' assistance. To respond to the above challenges, assistive technologies are called to develop Information and Communication Technology (ICT) services for supporting seniors to remain active and independent, for as long as possible, in their chosen home environment. The work described in this Letter is based on the Miraculous-Life project and it emphasises the identification and assessment of a set of services that an ICT system for Ageing Well should support, in an actual end-users setting. The outcome of this work may inform fellow researchers and other projects in the area of Ageing Well in: (i) understanding which ICT services can be the most valuable for end-users' Quality of Life, (ii) prioritising the development of related ICT services and (iii) facilitating better recourse allocation in order to reduce any risks associated to implementation failures of these services within their respective projects. A final trial phase is planned, aiming to validate the Miraculous Life prototype longitudinally in a naturalistic environment with a larger sample size. During this trial, it will be investigated if perceived usefulness, satisfaction and motivation could be predicted by sociodemographic variables and personality.

  12. Management of investment-construction projects basing on the matrix of key events

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2016-11-01

    Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.

  13. IT Requirements Integration in High-Rise Construction Design Projects

    Science.gov (United States)

    Levina, Anastasia; Ilin, Igor; Esedulaev, Rustam

    2018-03-01

    The paper discusses the growing role of IT support for the operation of modern high-rise buildings, due to the complexity of managing engineering systems of buildings and the requirements of consumers for the IT infrastructure. The existing regulatory framework for the development of design documentation for construction, including high-rise buildings, is analyzed, and the lack of coherence in the development of this documentation with the requirements for the creation of an automated management system and the corresponding IT infrastructure is stated. The lack of integration between these areas is the cause of delays and inefficiencies both at the design stage and at the stage of putting the building into operation. The paper proposes an approach to coordinate the requirements of the IT infrastructure of high-rise buildings and design documentation for construction. The solution to this problem is possible within the framework of the enterprise architecture concept by coordinating the requirements of the IT and technological layers at the design stage of the construction.

  14. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  15. Participatory development of a middleware for AAL solutions: requirements and approach – the case of SOPRANO

    Directory of Open Access Journals (Sweden)

    Schmidt, Andreas

    2008-10-01

    Full Text Available This paper describes the main features of a middleware for Ambient Assisted Living (AAL applications, exemplified along the SOPRANO research project. The contribution outlines main requirements towards the technical system and the elicitation methodology. The presented middleware allows for personalisation and flexible, extendible configuration of AAL solutions with low effort. Concerning the technical concept, the design approach as well as components, qualities and functionality of the AAL platform are depicted. Furthermore the methodology of requirements elicitation is discussed. It is explained how SOPRANO met the problem to elicit socio-technical system requirements in a user-centred manner, although the addressed target group is not expected to be able to express precise guidelines. SOPRANO („Service oriented programmable smart environments for older Europeans“, http://www.soprano-ip.org/ is a research project funded by the European Commission, which aims at the provision of a technical (AAL infrastructure to help elderly people to keep their independence and to stay in their familiar environment as long as possible. SOPRANO focuses on in-house support and emphasises well-being. It is a main goal to secure situation-aware assistance and help not only in case of emergencies but particularly as well in activities of daily living.

  16. Integrative, Interdisciplinary Learning in Bermuda Through Video Projects

    Science.gov (United States)

    Fox, R. J.; Connaughton, M.

    2017-12-01

    Understanding an ecosystem and how humans impact it requires a multidisciplinary perspective and immersive, experiential learning is an exceptional way to achieve understanding. In summer 2017 we took 18 students to the Bermuda Institute of Ocean Sciences (BIOS) as part of a Washington College two-week, four-credit summer field course. We took a multi-disciplinary approach in choosing the curriculum. We focused on the ecology of the islands and surrounding coral reefs as well as the environmental impacts humans are having on the islands. Additionally, we included geology and both local and natural history. Our teaching was supplemented by the BIOS staff and local tour guides. The student learning was integrated and reinforced through student-led video projects. Groups of three students were tasked with creating a 5-7 minute video appropriate for a public audience. We selected video topics based upon locations we would visit in the first week and topics were randomly assigned. The project intention was for the students to critically analyze and evaluate an area of Bermuda that is a worthwhile tourist destination. Students presented why a tourist should visit a locale, the area's ecological distinctiveness and complexity, the impact humans are having, and ways tourists can foster stewardship of that locale. These projects required students to learn how to make and edit videos, collaborate with peers, communicate a narrative to the public, integrate multi-disciplinary topics for a clear, whole-system perspective, observe the environment from a critical viewpoint, and interview local experts. The students produced the videos within the two-week period, and we viewed the videos as a group on the last day. The students worked hard, were proud of their final products, and produced excellent videos. They enjoyed the process, which provided them opportunities to collaborate, show individual strengths, be creative, and work independently of the instructors.

  17. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  18. Investment requirements in the oil industry of the independent oil exporting countries in the face of environmental challenges

    International Nuclear Information System (INIS)

    Rahmat, H.; Hamid, A.A.

    1992-01-01

    The oil industry has to operate under environmental constraints which involve commercial risks. Oil companies need to treat environmental management as an investment as well as an insurance problem, assessing risks and costs and deciding how to minimize them most cost effectively. Petroleum development in Malaysia is accelerating. In view of the high visibility of the industry and the wide publicity generated by a few incidents which have taken place outside Malaysia the national oil company, Petronas, is constantly vigilant in its efforts to preserve the environment. Oil producing countries like Malaysia will need to continue to set aside some of the revenue they obtain from the oil industry and use it for protecting the environment to ensure public acceptance and ultimately, orderly growth of their industry. Clearly they are less able to do so if their income is lessened through the interference with free trade among nations even if the purported reasons for the interference is the environment itself. Ultimately the environmental investment requirement in the oil industry of the independent and developing oil exporting countries is free trade without price distortions. The 1989 Langkawi Declaration on the Environment of the Commonwealth Heads of Government is appended to this article. (author)

  19. An assessment of independent component analysis for detection of military targets from hyperspectral images

    Science.gov (United States)

    Tiwari, K. C.; Arora, M. K.; Singh, D.

    2011-10-01

    Hyperspectral data acquired over hundreds of narrow contiguous wavelength bands are extremely suitable for target detection due to their high spectral resolution. Though spectral response of every material is expected to be unique, but in practice, it exhibits variations, which is known as spectral variability. Most target detection algorithms depend on spectral modelling using a priori available target spectra In practice, target spectra is, however, seldom available a priori. Independent component analysis (ICA) is a new evolving technique that aims at finding out components which are statistically independent or as independent as possible. The technique therefore has the potential of being used for target detection applications. A assessment of target detection from hyperspectral images using ICA and other algorithms based on spectral modelling may be of immense interest, since ICA does not require a priori target information. The aim of this paper is, thus, to assess the potential of ICA based algorithm vis a vis other prevailing algorithms for military target detection. Four spectral matching algorithms namely Orthogonal Subspace Projection (OSP), Constrained Energy Minimisation (CEM), Spectral Angle Mapper (SAM) and Spectral Correlation Mapper (SCM), and four anomaly detection algorithms namely OSP anomaly detector (OSPAD), Reed-Xiaoli anomaly detector (RXD), Uniform Target Detector (UTD) and a combination of Reed-Xiaoli anomaly detector and Uniform Target Detector (RXD-UTD) were considered. The experiments were conducted using a set of synthetic and AVIRIS hyperspectral images containing aircrafts as military targets. A comparison of true positive and false positive rates of target detections obtained from ICA and other algorithms plotted on a receiver operating curves (ROC) space indicates the superior performance of the ICA over other algorithms.

  20. Spent fuel storage requirements

    International Nuclear Information System (INIS)

    Fletcher, J.

    1982-06-01

    Spent fuel storage requirements, as projected through the year 2000 for U.S. LWRs, were calculated using information supplied by the utilities reflecting plant status as of December 31, 1981. Projections through the year 2000 combined fuel discharge projections of the utilities with the assumed discharges of typical reactors required to meet the nuclear capacity of 165 GWe projected by the Energy Information Administration (EIA) for the year 2000. Three cases were developed and are summarized. A reference case, or maximum at-reactor (AR) capacity case, assumes that all reactor storage pools are increased to their maximum capacities as estimated by the utilities for spent fuel storage utilizing currently licensed technologies. The reference case assumes no transshipments between pools except as currently licensed by the Nuclear Regulatory Commission (NRC). This case identifies an initial requirement for 13 MTU of additional storage in 1984, and a cumulative requirement for 14,490 MTU additional storage in the year 2000. The reference case is bounded by two alternative cases. One, a current capacity case, assumes that only those pool storage capacity increases currently planned by the operating utilities will occur. The second, or maximum capacity with transshipment case, assumes maximum development of pool storage capacity as described above and also assumes no constraints on transshipment of spent fuel among pools of reactors of like type (BWR, PWR) within a given utility. In all cases, a full core discharge capability (full core reserve or FCR) is assumed to be maintained for each reactor, except that only one FCR is maintained when two reactors share a common pool. For the current AR capacity case the indicated storage requirements in the year 2000 are indicated to be 18,190 MTU; for the maximum capacity with transshipment case they are 11,320 MTU