WorldWideScience

Sample records for projects program guidelines

  1. 75 FR 48934 - Coral Reef Conservation Program Implementation Guidelines

    Science.gov (United States)

    2010-08-12

    ...-01] RIN 0648-ZC19 Coral Reef Conservation Program Implementation Guidelines AGENCY: National Oceanic... Guidelines (Guidelines) for the Coral Reef Conservation Program (CRCP or Program) under the Coral Reef... assistance for coral reef conservation projects under the Act. NOAA revised the Implementation Guidelines for...

  2. Comprehensive School Alienation Program, Guidelines.

    Science.gov (United States)

    Hawaii State Dept. of Education, Honolulu. Office of Instructional Services.

    This document presents guidelines developed by the Hawaii State Department of Education's Comprehensive School Alienation Program to consolidate and strengthen the delivery of services to alienated students. It is intended to assist district staff, school administrators, and project personnel in planning and implementing program activities and…

  3. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  4. Recommendations for Guidelines for Environment-Specific Magnetic-Field Measurements, Rapid Program Engineering Project #2

    Energy Technology Data Exchange (ETDEWEB)

    Electric Research and Management, Inc.; IIT Research Institute; Magnetic Measurements; Survey Research Center, University of California; T. Dan Bracken, Inc.

    1997-03-11

    The purpose of this project was to document widely applicable methods for characterizing the magnetic fields in a given environment, recognizing the many sources co-existing within that space. The guidelines are designed to allow the reader to follow an efficient process to (1) plan the goals and requirements of a magnetic-field study, (2) develop a study structure and protocol, and (3) document and carry out the plan. These guidelines take the reader first through the process of developing a basic study strategy, then through planning and performing the data collection. Last, the critical factors of data management, analysis reporting, and quality assurance are discussed. The guidelines are structured to allow the researcher to develop a protocol that responds to specific site and project needs. The Research and Public Information Dissemination Program (RAPID) is based on exposure to magnetic fields and the potential health effects. Therefore, the most important focus for these magnetic-field measurement guidelines is relevance to exposure. The assumed objective of an environment-specific measurement is to characterize the environment (given a set of occupants and magnetic-field sources) so that information about the exposure of the occupants may be inferred. Ideally, the researcher seeks to obtain complete or "perfect" information about these magnetic fields, so that personal exposure might also be modeled perfectly. However, complete data collection is not feasible. In fact, it has been made more difficult as the research field has moved to expand the list of field parameters measured, increasing the cost and complexity of performing a measurement and analyzing the data. The guidelines address this issue by guiding the user to design a measurement protocol that will gather the most exposure-relevant information based on the locations of people in relation to the sources. We suggest that the "microenvironment" become the base unit of area in a study, with

  5. Comparison of international guideline programs to evaluate and update the Dutch program for clinical guideline development in physical therapy.

    Science.gov (United States)

    Van der Wees, Philip J; Hendriks, Erik J M; Custers, Jan W H; Burgers, Jako S; Dekker, Joost; de Bie, Rob A

    2007-11-23

    Clinical guidelines are considered important instruments to improve quality in health care. Since 1998 the Royal Dutch Society for Physical Therapy (KNGF) produced evidence-based clinical guidelines, based on a standardized program. New developments in the field of guideline research raised the need to evaluate and update the KNGF guideline program. Purpose of this study is to compare different guideline development programs and review the KNGF guideline program for physical therapy in the Netherlands, in order to update the program. Six international guideline development programs were selected, and the 23 criteria of the AGREE Instrument were used to evaluate the guideline programs. Information about the programs was retrieved from published handbooks of the organizations. Also, the Dutch program for guideline development in physical therapy was evaluated using the AGREE criteria. Further comparison the six guideline programs was carried out using the following elements of the guideline development processes: Structure and organization; Preparation and initiation; Development; Validation; Dissemination and implementation; Evaluation and update. Compliance with the AGREE criteria of the guideline programs was high. Four programs addressed 22 AGREE criteria, and two programs addressed 20 AGREE criteria. The previous Dutch program for guideline development in physical therapy lacked in compliance with the AGREE criteria, meeting only 13 criteria. Further comparison showed that all guideline programs perform systematic literature searches to identify the available evidence. Recommendations are formulated and graded, based on evidence and other relevant factors. It is not clear how decisions in the development process are made. In particular, the process of translating evidence into practice recommendations can be improved. As a result of international developments and consensus, the described processes for developing clinical practice guidelines have much in common

  6. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  7. Comparison of international guideline programs to evaluate and update the Dutch program for clinical guideline development in physical therapy

    Directory of Open Access Journals (Sweden)

    Burgers Jako S

    2007-11-01

    Full Text Available Abstract Background Clinical guidelines are considered important instruments to improve quality in health care. Since 1998 the Royal Dutch Society for Physical Therapy (KNGF produced evidence-based clinical guidelines, based on a standardized program. New developments in the field of guideline research raised the need to evaluate and update the KNGF guideline program. Purpose of this study is to compare different guideline development programs and review the KNGF guideline program for physical therapy in the Netherlands, in order to update the program. Method Six international guideline development programs were selected, and the 23 criteria of the AGREE Instrument were used to evaluate the guideline programs. Information about the programs was retrieved from published handbooks of the organizations. Also, the Dutch program for guideline development in physical therapy was evaluated using the AGREE criteria. Further comparison the six guideline programs was carried out using the following elements of the guideline development processes: Structure and organization; Preparation and initiation; Development; Validation; Dissemination and implementation; Evaluation and update. Results Compliance with the AGREE criteria of the guideline programs was high. Four programs addressed 22 AGREE criteria, and two programs addressed 20 AGREE criteria. The previous Dutch program for guideline development in physical therapy lacked in compliance with the AGREE criteria, meeting only 13 criteria. Further comparison showed that all guideline programs perform systematic literature searches to identify the available evidence. Recommendations are formulated and graded, based on evidence and other relevant factors. It is not clear how decisions in the development process are made. In particular, the process of translating evidence into practice recommendations can be improved. Conclusion As a result of international developments and consensus, the described processes

  8. IMAGE Programming Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Stehfest, E; De Waal, L.

    2010-09-15

    This document describes the requirements and guidelines for the software of the IMAGE system. The motivation for this report was a substantial restructuring of the source code for IMAGE version 2.5. The requirements and guidelines relate to design considerations as well as to aspects of maintainability and portability. The design considerations determine guidelines about subjects, such as program structure, model hierarchy, the use of data modules, and the error message system. Maintainability and portability aspects determine the guidelines on, for example, the Fortran 90 standard, naming conventions, code lay-out, and internal documentation.

  9. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  10. Impact of financial institution environmental guidelines on international power generation projects

    International Nuclear Information System (INIS)

    Macak, J.J. III; Schott, G.A.

    1995-01-01

    Where financing is concerned, two major players for US based international power projects are The World Bank and the Export-Import Bank of the US (Ex-Im Bank). The concern for environmental protection is a global issue, yet many countries still have no enforceable environmental regulations for power generation facilities. In the past, many projects were developed with little or no environmental controls. However, designing a power generation project to meet The World Bank environmental guidelines is now generally regarded as standard practice for independent power projects in the developing world (Price et al, 1994). The World Bank standards are mandatory for projects financed by The World Bank, through the International Finance Corporation (IFC), or associated programs like the Expanded Cofinancing Program of the International Bank for Reconstruction and Development (IBRD). The Ex-Im Bank has recently established new environmental procedures and guidelines that went into effect on February 1, 1995. In order to avoid a competitive disadvantage for US exporters and still provide a means for global environmental protection, Ex-Im Bank has taken a leadership role in encouraging the adoption of common environmental procedures and standards by leading export credit agencies around the world. Until such procedures are established, Ex-Im Bank is seeking to establish common lines in specific cases with the Organization for Economic Cooperation and Development (OECD) on environmental standards for appropriate projects (Ex-Im, 1994)

  11. 50 CFR 253.18 - Program operating guidelines.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Program operating guidelines. 253.18 Section 253.18 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC... Guarantee Program § 253.18 Program operating guidelines. The Division may issue Program operating guidelines...

  12. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  13. Programming Guidelines for FBD Programs in Reactor Protection System Software

    International Nuclear Information System (INIS)

    Jung, Se Jin; Lee, Dong Ah; Kim, Eui Sub; Yoo, Jun Beom; Lee, Jang Su

    2014-01-01

    Properties of programming languages, such as reliability, traceability, etc., play important roles in software development to improve safety. Several researches are proposed guidelines about programming to increase the dependability of software which is developed for safety critical systems. Misra-c is a widely accepted programming guidelines for the C language especially in the sector of vehicle industry. NUREG/CR-6463 helps engineers in nuclear industry develop software in nuclear power plant systems more dependably. FBD (Function Block Diagram), which is one of programming languages defined in IEC 61131-3 standard, is often used for software development of PLC (programmable logic controllers) in nuclear power plants. Software development for critical systems using FBD needs strict guidelines, because FBD is a general language and has easily mistakable elements. There are researches about guidelines for IEC 61131-3 programming languages. They, however, do not specify details about how to use languages. This paper proposes new guidelines for the FBD based on NUREG/CR-6463. The paper introduces a CASE (Computer-Aided Software Engineering) tool to check FBD programs with the new guidelines and shows availability with a case study using a FBD program in a reactor protection system. The paper is organized as follows

  14. Programming Guidelines for FBD Programs in Reactor Protection System Software

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Se Jin; Lee, Dong Ah; Kim, Eui Sub; Yoo, Jun Beom [Division of Computer Science and Engineering College of Information and Communication, Konkuk University, Seoul (Korea, Republic of); Lee, Jang Su [Man-Machine Interface System team Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    Properties of programming languages, such as reliability, traceability, etc., play important roles in software development to improve safety. Several researches are proposed guidelines about programming to increase the dependability of software which is developed for safety critical systems. Misra-c is a widely accepted programming guidelines for the C language especially in the sector of vehicle industry. NUREG/CR-6463 helps engineers in nuclear industry develop software in nuclear power plant systems more dependably. FBD (Function Block Diagram), which is one of programming languages defined in IEC 61131-3 standard, is often used for software development of PLC (programmable logic controllers) in nuclear power plants. Software development for critical systems using FBD needs strict guidelines, because FBD is a general language and has easily mistakable elements. There are researches about guidelines for IEC 61131-3 programming languages. They, however, do not specify details about how to use languages. This paper proposes new guidelines for the FBD based on NUREG/CR-6463. The paper introduces a CASE (Computer-Aided Software Engineering) tool to check FBD programs with the new guidelines and shows availability with a case study using a FBD program in a reactor protection system. The paper is organized as follows.

  15. Guidelines for the documentation of digital computer programs - approved 1974

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    This standard presents guidelines for the documentation of engineering and scientific computer programs. Good documentation promotes understanding, reduces duplication of effort, eases conversion to different computer environments and aids modification for extended applications. Good documentation is essential for implementation and effective use of programs obtained from other installations. Since the intention of this standard is to encourage better communication between the developer and user, it should be regarded as a guide rather than a set of rigid specifications. As a guide, it is sufficiently comprehensive to apply to large-scale programs intended for extensive external use. Not all features of this document are appropriate in all circumstances. In general, as the project complexity increases so does the need for more complete documentation. An organization may have special documentation requirements which supersede or extend these guidelines. This standard is a revision of ANS-STD.2-1967 and supersedes it

  16. Guidelines For Evaluation Of Natural Gas Projects

    International Nuclear Information System (INIS)

    Farag, H.; El Messirie, A.

    2004-01-01

    This paper is objected to give guidelines for natural gas projects appraisal These guidelines are summarized in modeling of natural gas demand forecast and energy pricing policies for different gas consumers mainly in the manufacturing, mining, transport, trade and agriculture sectors. Analysis of the results is made through sensitivity analysis and decision support system ( DSS )

  17. Postdoctoral program guidelines.

    Energy Technology Data Exchange (ETDEWEB)

    Teich-McGoldrick, Stephanie; Miller, Andrew W.; Sava, Dorina Florentina; Liu, Yanli; Ferreira, Summer Rhodes; Biedermann, Laura Butler; Cruz-Campa, Jose Luis; Hall, Lisa Michelle; Liu, Xiaohua H.; Ekoto, Isaac

    2012-04-01

    We, the Postdoc Professional Development Program (PD2P) leadership team, wrote these postdoc guidelines to be a starting point for communication between new postdocs, their staff mentors, and their managers. These guidelines detail expectations and responsibilities of the three parties, as well as list relevant contacts. The purpose of the Postdoc Program is to bring in talented, creative people who enrich Sandia's environment by performing innovative R&D, as well as by stimulating intellectual curiosity and learning. Postdocs are temporary employees who come to Sandia for career development and advancement reasons. In general, the postdoc term is 1 year, renewable up to five times for a total of six years. However, center practices may vary; check with your manager. At term, a postdoc may apply for a staff position at Sandia or choose to move to university, industry or another lab. It is our vision that those who leave become long-term collaborators and advocates whose relationships with Sandia have a positive effect upon our national constituency.

  18. Programming guidelines for computer systems of NPPs

    International Nuclear Information System (INIS)

    Suresh babu, R.M.; Mahapatra, U.

    1999-09-01

    Software quality is assured by systematic development and adherence to established standards. All national and international software quality standards have made it mandatory for the software development organisation to produce programming guidelines as part of software documentation. This document contains a set of programming guidelines for detailed design and coding phases of software development cycle. These guidelines help to improve software quality by increasing visibility, verifiability, testability and maintainability. This can be used organisation-wide for various computer systems being developed for our NPPs. This also serves as a guide for reviewers. (author)

  19. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  20. The relative influence of secondary versus primary prevention using the national cholesterol education program adult treatment panel II guidelines

    NARCIS (Netherlands)

    Goldman, L; Coxson, P; Hunink, MGM; Goldman, PA; Tosteson, ANA; Mittleman, M; Williams, L; Weinstein, MC

    OBJECTIVES This study was undertaken to project the population-wide effect of full implementation of the Adult Treatment Panel (ATP) II guidelines of the National Cholesterol Education Program (NCEP). BACKGROUND The ATP II has proposed guidelines for cholesterol reduction, but the long-term

  1. An introduction to use of the USACE HTRW program's data validation guidelines engineering manual

    International Nuclear Information System (INIS)

    Becker, L.D.; Coats, K.H.

    1994-01-01

    Data validation has been defined by regulatory agencies as a systematic process (consisting of data editing, screening, checking, auditing, verification, certification, and review) for comparing data to established criteria in order to provide assurance that data are adequate for their intended use. A problem for the USACE HTRW Program was that clearly defined data validation guidelines were available only for analytical data quality level IV. These functional data validation guidelines were designed for validation of data produced using protocols from the US E.P.A.'s Contract Laboratory Program (CLP). Unfortunately, USACE experience demonstrates that these level IV functional data validation guidelines were being used to validate data not produced under the CLP. The resulting data validation product was less than satisfactory for USACE HTRW needs. Therefore, the HTRW-MCX initiated an Engineering Manual (EM) for validation of analytical data quality levels other than IV. This EM is entitle ''USACE HTRW Data Validation Guidelines.'' Use of the EM is required for validation of analytical data relating to projects under the jurisdiction of the Department of the Army, Corps of Engineers, Hazardous, Toxic, and Radioactive Waste Program. These data validation guidelines include procedures and checklists for technical review of analytical data at quality levels I, II, III, and V

  2. The impacts of the 1995 financial institution environmental guidelines on power projects

    International Nuclear Information System (INIS)

    Weaver, K.L.; Schott, G.A.

    1996-01-01

    In 1995, two of the most influential international financial institutions, The World Bank and The US Export-Import Bank (Ex-Im Bank) issued new environmental guidelines. These guidelines, particularly the World Bank guidelines, are used as a benchmark for evaluating the environmental acceptability of a project by many financial institutions, project developers, private investors, the public, and many developing countries. The impact of these guidelines must be well understood by developers of power projects in order to obtain the necessary financing, in addition to attracting investors, and obtaining national approvals and general public acceptance

  3. A Knotworking Guideline for Building Projects

    DEFF Research Database (Denmark)

    Rasmussen, Mai; Gade, Anne Nørkjær; Jensen, Rasmus Lund

    2017-01-01

    to collaborate occurs. The Finnish method, Knotworking AEC, emphasizes both collaboration and structure of building projects, which accommodates the lack of collaboration in the practices of the AEC sector. However, the recent development of Knotworking AEC implies a lack of written articles on Knotworking AEC...... experiments were analysed by practice theoretical methods. The result of this research is a Knotworking Guideline for Building Projects indicating both the phases, the participants and the tasks of each phase. The contribution of the resultlies in the conduction of a Knotworking session from both a practical...

  4. Guidelines for Home Energy Professionals Project (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-03-01

    The Guidelines for Home Energy Professionals is a collaboration between the U.S. Department of Energy (DOE) and a wide range of home energy performance industry professionals. The Guidelines project, managed by the National Renewable Energy Laboratory (NREL) for DOE, addresses the need for a highly-skilled weatherization workforce equipped to complete consistent, high-quality home energy upgrades for single-family homes, multifamily homes, and manufactured housing. In doing so, it helps increase energy efficiency in housing, which can mitigate climate change, one of the major challenges of the 21st century.

  5. School Business Community Partnership Brokers. Program Guidelines, 2010-2013

    Science.gov (United States)

    Australian Government Department of Education, Employment and Workplace Relations, 2009

    2009-01-01

    These guidelines for 2010-2013 relate specifically to the Partnership Brokers program. This program is part of the Australian Government's contribution to the Youth Attainment and Transitions National Partnership and will commence on 1 January 2010. These Guidelines set out the requirements for the provision of services by organisations contracted…

  6. Fadama III Beneficiaries' Adherence to Project Guidelines in Ogun ...

    African Journals Online (AJOL)

    It was recommended that the implementers should keep up their efforts at sensitising beneficiaries on the implementation guidelines of the project, re-work their strategies at addressing procurement and FUEF inadequacies among the beneficiaries and fast-track the delivery of project benefits in the communities. Key words: ...

  7. Patient participation in ERS guidelines and research projects: the EMBARC experience.

    Science.gov (United States)

    Chalmers, James D; Timothy, Alan; Polverino, Eva; Almagro, Marta; Ruddy, Thomas; Powell, Pippa; Boyd, Jeanette

    2017-09-01

    The European Multicentre Bronchiectasis Audit and Research Collaboration (EMBARC) is a European Respiratory Society (ERS) Clinical Research Collaboration dedicated to improving research and clinical care for people with bronchiectasis. EMBARC has created a European Bronchiectasis Registry, funded by the ERS and by the European Union (EU) Innovative Medicines Initiative Programme. From the outset, EMBARC had the ambition to be a patient-focussed project. In contrast to many respiratory diseases, however, there are no specific patient charities or European patient organisations for patients with bronchiectasis and no existing infrastructure for patient engagement. This article describes the experience of EMBARC and the European Lung Foundation in establishing a patient advisory group and then engaging this group in European guidelines, an international registry and a series of research studies. Patient involvement in research, clinical guidelines and educational activities is increasingly advocated and increasingly important. Genuine patient engagement can achieve a number of goals that are critical to the success of an EU project, including focussing activities on patient priorities, allowing patients to direct the clinical and research agenda, and dissemination of guidelines and research findings to patients and the general public. Here, we review lessons learned and provide guidance for future ERS task forces, EU-funded projects or clinical research collaborations that are considering patient involvement. To understand the different ways in which patients can contribute to clinical guidelines, research projects and educational activities.To understand the barriers and potential solutions to these barriers from a physician's perspective, in order to ensure meaningful patient involvement in clinical projects.To understand the barriers and potential solutions from a patient's perspective, in order to meaningfully involve patients in clinical projects.

  8. Best practice guidelines for stroke in Cameroon: An innovative and participatory knowledge translation project

    Directory of Open Access Journals (Sweden)

    Lynn Cockburn

    2014-11-01

    Objectives: The purpose of this article is to describe how a group of front-line practitioners collaborated with academics and students to develop best practice guidelines (BPG for the management and rehabilitation of stroke in adult patients in Cameroon. Method: A working group was established and adapted internationally recognised processes for the development of best practice guidelines. The group determined the scope of the guidelines, documented current practices, and critically appraised evidence to develop guidelines relevant to the Cameroon context. Results: The primary result of this project is best practice guidelines which provided an overview of the provision of stroke rehabilitation services in the region, and made 83 practice recommendations to improve these services. We also report on the successes and challenges encountered during the process, and the working group’s recommendations aimed at encouraging others to consider similar projects. Conclusion: This project demonstrated that there is interest and capacity for improving stroke rehabilitation practices and for stroke guideline development in Africa.

  9. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  10. Guidelines for developing certification programs for newly generated TRU waste

    International Nuclear Information System (INIS)

    Whitty, W.J.; Ostenak, C.A.; Pillay, K.K.S.; Geoffrion, R.R.

    1983-05-01

    These guidelines were prepared with direction from the US Department of Energy (DOE) Transuranic (TRU) Waste Management Program in support of the DOE effort to certify that newly generated TRU wastes meet the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria. The guidelines provide instructions for generic Certification Program preparation for TRU-waste generators preparing site-specific Certification Programs in response to WIPP requirements. The guidelines address all major aspects of a Certification Program that are necessary to satisfy the WIPP Waste Acceptance Criteria and their associated Compliance Requirements and Certification Quality Assurance Requirements. The details of the major element of a Certification Program, namely, the Certification Plan, are described. The Certification Plan relies on supporting data and control documentation to provide a traceable, auditable account of certification activities. Examples of specific parts of the Certification Plan illustrate the recommended degree of detail. Also, a brief description of generic waste processes related to certification activities is included

  11. The virtual asthma guideline e-learning program: learning effectiveness and user satisfaction.

    Science.gov (United States)

    Kang, Sung-Yoon; Kim, Sae-Hoon; Kwon, Yong-Eun; Kim, Tae-Bum; Park, Hye-Kyung; Park, Heung-Woo; Chang, Yoon-Seok; Jee, Young-Koo; Moon, Hee-Bom; Min, Kyung-Up; Cho, Sang-Heon

    2018-05-01

    Effective educational tools are important for increasing adherence to asthma guidelines and clinical improvement of asthma patients. We developed a computer-based interactive education program for asthma guideline named the Virtual Learning Center for Asthma Management (VLCAM). We evaluated the usefulness of program in terms of its effects on user awareness of asthma guideline and level of satisfaction. Physicians-in-training at tertiary hospitals in Korea were enrolled in a cross-sectional questionnaire survey. The e-learning program on asthma guideline was conducted over a 2-week period. We investigated changes in the awareness of asthma guideline using 35-item self-administered questionnaire aiming at assessing physicians' knowledge, attitude, and practice. Satisfaction with the program was scored on 4-point Likert scales. A total of 158 physicians-in-training at six tertiary hospitals completed the survey. Compared with baseline, the overall awareness obtained from the scores of knowledge, attitude, and practice was improved significantly. Participants were satisfied with the VLCAM program in the following aspects: helpfulness, convenience, motivation, effectiveness, physicians' confidence, improvement of asthma management, and willingness to recommend. All items in user satisfaction questionnaires received high scores over 3 points. Moreover, the problem-based learning with a virtual patient received the highest user satisfaction among all parts of the program. Our computer-based e-learning program is useful for improving awareness of asthma management. It could improve adherence to asthma guidelines and enhance the quality of asthma care.

  12. 36 CFR 328.5 - Guidelines for seaplane use of project waters.

    Science.gov (United States)

    2010-07-01

    ... of project waters. 328.5 Section 328.5 Parks, Forests, and Public Property CORPS OF ENGINEERS... ADMINISTERED BY THE CHIEF OF ENGINEERS § 328.5 Guidelines for seaplane use of project waters. (a) All... power boats or vessels. (b) Seaplanes on project waters and lands in excess of 24 hours shall be...

  13. [The German program for disease management guidelines--implementation with pathways and quality management].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  14. Guidelines for Evaluating Auditory-Oral Programs for Children Who Are Hearing Impaired.

    Science.gov (United States)

    Alexander Graham Bell Association for the Deaf, Inc., Washington, DC.

    These guidelines are intended to assist parents in evaluating educational programs for children who are hearing impaired, where a program's stated intention is promoting the child's optimal use of spoken language as a mode of everyday communication and learning. The guidelines are applicable to programs where spoken language is the sole mode or…

  15. Patient participation in ERS guidelines and research projects: the EMBARC experience

    Directory of Open Access Journals (Sweden)

    James D. Chalmers

    2017-09-01

    To understand the different ways in which patients can contribute to clinical guidelines, research projects and educational activities. To understand the barriers and potential solutions to these barriers from a physician’s perspective, in order to ensure meaningful patient involvement in clinical projects. To understand the barriers and potential solutions from a patient’s perspective, in order to meaningfully involve patients in clinical projects.

  16. Summary of the technical guidelines used in the project: The economics of greenhouse gas limitations

    International Nuclear Information System (INIS)

    Halsnaes, Kirsten

    1998-01-01

    This document is a summary version of the technical guidelines for climate change mitigation assessment developed as a part of the Global Environment Facility (GEF) project The Economics of Greenhouse Gas Limitations; Technical guidelines (UNEP 1998). The objectives of this project have been to support the development of a methodology, an implementing framework and a reporting system which countries can use in the construction of national climate change policies and in meeting their future reporting obligations under the FCCC. The methodological framework developed in the guidelines covers key economic concepts, scenario building, modelling tools and common assumptions. It was used by several country studies included in the project. (au)

  17. General guidelines for the Assessment of Internal Dose from Monitoring Data (Project IDEAS)

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Blanchardon, E.; Berkovski, V.; Castellani, C. M.; Hurtgen, C.; Jourdain, J. R.; LeGuen, B.; Puncher, M.

    2004-01-01

    In recent major international intercomparison exercises on intake and internal dose assessments from monitoring data the results calculated by different participants varied significantly. This was mainly due to the broad variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need for harmonisation of the procedures has been formulated within an EU research project under the 5th Framework Programme. The aim of the project, IDEAS, is to develop general guidelines for standardising assessments of intakes and internal doses. The IDEAS project started in October 2001 and will end in March 2005. Eight institutions from seven European countries are participating. Inputs from internal dosimetry professionals from across Europe are also being used to ensure a broad consensus in the outcome of the project. The IDEAS project is closely related to some goals of the work of Committee 2 of the ICRP and since 2003 there has been close cooperation between the two groups. To ensure that the guidelines are applicable to a wide range of practical situations, the first step has been to compile a database of well-documented cases of internal contamination. In parallel, an improved version of an existing software package has been developed and distributed to the partners for further use. A large number of cases from the database have been evaluated independently by partners in the project using the same software and the results have been reviewed. Based on these evaluations guidelines are being drafted and will be discussed with dosimetry professionals from around the world by means of a virtual workshop on the Internet early in 2004. The guidelines will be revised and refined on the basis of the experiences and discussions of this virtual workshop and the outcome of an intercomparison exercise organised as part of the project. This will be open to all internal dosimetry professionals. (Author) 10 refs

  18. Standard guidelines for the chromosome-centric human proteome project.

    Science.gov (United States)

    Paik, Young-Ki; Omenn, Gilbert S; Uhlen, Mathias; Hanash, Samir; Marko-Varga, György; Aebersold, Ruedi; Bairoch, Amos; Yamamoto, Tadashi; Legrain, Pierre; Lee, Hyoung-Joo; Na, Keun; Jeong, Seul-Ki; He, Fuchu; Binz, Pierre-Alain; Nishimura, Toshihide; Keown, Paul; Baker, Mark S; Yoo, Jong Shin; Garin, Jerome; Archakov, Alexander; Bergeron, John; Salekdeh, Ghasem Hosseini; Hancock, William S

    2012-04-06

    The objective of the international Chromosome-Centric Human Proteome Project (C-HPP) is to map and annotate all proteins encoded by the genes on each human chromosome. The C-HPP consortium was established to organize a collaborative network among the research teams responsible for protein mapping of individual chromosomes and to identify compelling biological and genetic mechanisms influencing colocated genes and their protein products. The C-HPP aims to foster the development of proteome analysis and integration of the findings from related molecular -omics technology platforms through collaborations among universities, industries, and private research groups. The C-HPP consortium leadership has elicited broad input for standard guidelines to manage these international efforts more efficiently by mobilizing existing resources and collaborative networks. The C-HPP guidelines set out the collaborative consensus of the C-HPP teams, introduce topics associated with experimental approaches, data production, quality control, treatment, and transparency of data, governance of the consortium, and collaborative benefits. A companion approach for the Biology and Disease-Driven HPP (B/D-HPP) component of the Human Proteome Project is currently being organized, building upon the Human Proteome Organization's organ-based and biofluid-based initiatives (www.hupo.org/research). The common application of these guidelines in the participating laboratories is expected to facilitate the goal of a comprehensive analysis of the human proteome.

  19. Examining Guidelines for School-Based Breakfast Programs in Canada: A Systematic Review of the Grey Literature.

    Science.gov (United States)

    Godin, Katelyn M; Kirkpatrick, Sharon I; Hanning, Rhona M; Stapleton, Jackie; Leatherdale, Scott T

    2017-06-01

    School breakfast programs are widespread and serve varying objectives regarding youth health promotion. Evidence-based guidelines for breakfast programs may be important in maximizing their effectiveness related to student outcomes, yet it is unclear what is available in Canada. A systematic review was conducted to identify and compare Canadian guidelines related to breakfast programs. Data sources included grey literature databases, customized search engines, targeted websites, and content expert consultations. Eligible guidelines met the following criteria: government and nongovernment sources at the federal and provincial/territorial levels, current version, and intended for program coordinators. Recommendations for program delivery were extracted, categorized, and mapped onto the 4 environments outlined in the ANGELO framework, and they were classified as "common" or "inconsistent" across guidelines. Fifteen sets of guidelines were included. No guidelines were available from federal or territorial governments and 4 provincial governments. There were few references to peer-reviewed literature within the guidelines and despite many common recommendations for program delivery, conflicting recommendations were also identified. Potential barriers to program participation, including a lack of consideration of allergies and other dietary restrictions, were identified. Future research should identify how guidelines are implemented and evaluate what effect their implementation has on program delivery and student outcomes.

  20. Medicare program; Medicare depreciation, useful life guidelines--HCFA. Final rule.

    Science.gov (United States)

    1983-08-18

    These final rules amend Medicare regulations to clarify which useful life guidelines may be used by providers of health care services to determine the useful life of a depreciable asset for Medicare reimbursement purposes. Current regulations state that providers must utilize the Departmental useful life guidelines or, if none have been published by the Department, either the American Hospital Association (AHA) useful life guidelines of 1973 of IRS guidelines. We are eliminating the reference to IRS guidelines because these are now outdated for Medicare purposes since they have been rendered obsolete either by the IRS or by statutory change. We are also deleting the specific reference to the 1973 AHA guidelines since these guidelines are updated by the AHA periodically. In addition, we are clarifying that certain tax legislation on accelerated depreciation, passed by Congress, does not apply to the Medicare program.

  1. Ecoturism: Concepts, Reflections and Guidelines for Landscape Projects

    Directory of Open Access Journals (Sweden)

    Luis Guilherme A. Pippi

    2010-12-01

    Full Text Available This study aims to expound some concepts and guidelines within the area of ecotourism, in order to aid all those involved in the area, both directly and indirectly, in the process of conception and maintenance of Areas of Environmental Preservation. The analysis deals with the articulation of main objectives and project strategies. In alternative tourism projects, application of methodologies of diagnosis and interpretation, as well as creative sensibility and knowledge of landscape building materials are all necessary in order to conserve the natural and cultural heritage of a region and provide the community and ecotourist with an awakening of environmental consciousness.

  2. [The German program for disease management guidelines. Results and perspectives].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina

    2007-05-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) is a joint initiative of the German Medical Association (umbrella organization of the German Chambers of Physicians), the Association of the Scientific Medical Societies (AWMF), and of the National Association of Statutory Health Insurance Physicians (NASHIP). The program aims at developing, implementing and continuously updating best-practice recommendations for countrywide and regional disease management programs in Germany. Since 2003 twelve national guidelines (topics: asthma, chronic obstructive pulmonary disease, HI (Chronic heart failure), CVD (Chronic coronary heart disease) back pain, depression, several aspects of diabetes) have been produced by use of a standardized procedure in accordance with internationally consented methodologies. For countrywide dissemination and implementation the program uses a wide range of specialist journals, continuous medical education and quality management programs. So far, 36 out of 150 national scientific medical associations, four allied health profession organizations, and twelve national consumer organizations have been participating in the DM-CPG Program. Studies to evaluate the program's effects on health-care providers' behavior and patients' outcomes are under way.

  3. 49 CFR Appendix D to Part 26 - Mentor-Protégé Program Guidelines

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Mentor-Protégé Program Guidelines D Appendix D... D to Part 26—Mentor-Protégé Program Guidelines (A) The purpose of this program element is to further... and assistance from other firms. To operate a mentor-protégé program, a recipient must obtain the...

  4. Review of standards and guidelines pertinent to DOE's remedial action programs

    International Nuclear Information System (INIS)

    Soldat, J.K.; Denham, D.H.

    1984-10-01

    A number of radiological standards, guidelines, and dose criteria have been promulgated that may be relevant to the Department of Energy's (DOE) Remedial Action programs. Some of these will be applied to remedial actions undertaken by DOE to ensure that health and safety aspects will be adequately addressed. Pacific Northwest Laboratory staff are reviewing and evaluating existing and proposed environmental radiological standards and criteria for their applicability. National and international environmental standards and criteria, and studies conducted by other DOE contractors are being evaluated. The aim of the review is to identify gaps in these standards and guidelines and to recommend further development as necessary. This paper provides a summary of the standards and guidelines evaluated for applicability to DOE's Remedial Action programs. 33 references, 5 tables

  5. Identifying Problems in Students’ Final Projects Based on Scientific Writing Guidelines

    Directory of Open Access Journals (Sweden)

    Endang Ernawati

    2010-11-01

    Full Text Available Article analyzed student’s difficulties and abilities in writing their final projects, which were undergraduate theses and undergraduate paper conducted by some students at the English Department, Bina Nusantara University. This was a preliminary study to support an appropriate student guideline in writing their final project. The study was conducted by applying qualitative methods that was by analyzing the four theses and one paper in terms of their format: titles, introduction, theoretical background, analysis, conclusion, bibliography, and paper rubric to analyze the contents. It can be concluded that generally, students, guided by their mentor/lecturer, understand the final paper guidelines and they are able to apply it in their thesis and paper. But, there are still lack of clarity and relevancy in expressing their ideas properly, and their ability in writing in both English and Bahasa Indonesia must be improved. These problems can be overcome by socializing the writing guidelines to both students and lecturers, providing them with critical thinking skills, cooperation with library that will guide them in information literacy skills, and language center that will improve their writing skills. 

  6. Guidelines and procedures for the International Code Assessment and Applications Program

    International Nuclear Information System (INIS)

    1987-04-01

    This document presents the guidelines and procedures by which the International Code Assessment and Applications Program (ICAP) will be conducted. The document summarizes the management structure of the program and the relationships between and responsibilities of the United States Nuclear Regulatory Commission (USNRC) and the international participants. The procedures for code maintenance and necessary documentation are described. Guidelines for the performance and documentation of code assessment studies are presented. An overview of an effort to quantify code uncertainty, which the ICAP supports, is included

  7. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  8. 76 FR 34086 - Mandatory Guidelines for Federal Workplace Drug Testing Programs; Request for Information...

    Science.gov (United States)

    2011-06-10

    ... Mandatory Guidelines for Federal Workplace Drug Testing Programs; Request for Information Regarding Specific Issues Related to the Use of the Oral Fluid Specimen for Drug Testing AGENCY: Substance Abuse and Mental... may be applied to the Mandatory Guidelines for Federal Workplace Drug Testing Programs (oral fluid...

  9. 15 CFR 917.11 - Guidelines for Sea Grant Fellowships.

    Science.gov (United States)

    2010-01-01

    ... percent matching funds from non-Federal sources to which all Matched Funding Program projects are subject... NATIONAL SEA GRANT PROGRAM FUNDING REGULATIONS Sea Grant Matched Funding Program § 917.11 Guidelines for... applications for Sea Grant Fellowship funding. (b) Funding will be made to eligible entities (see § 917.10 of...

  10. Bats and bat habitats : guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-03-01

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  11. Bats and bat habitats : guidelines for wind power projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  12. 45 CFR 1180.70 - Guidelines and standards for museum conservation projects.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Guidelines and standards for museum conservation projects. 1180.70 Section 1180.70 Public Welfare Regulations Relating to Public Welfare (Continued..., as applied to art, history, natural history, science and technology, and living collections: (1...

  13. 75 FR 22809 - Mandatory Guidelines for Federal Workplace Drug Testing Programs

    Science.gov (United States)

    2010-04-30

    ... time for related training in Federal and federally-regulated workplace drug testing programs and will... related training in Federal and federally-regulated workplace drug testing programs, including HHS... DEPARTMENT OF HEALTH AND HUMAN SERVICES Mandatory Guidelines for Federal Workplace Drug Testing...

  14. Guidelines for Planning the School Breakfast Program. Revised.

    Science.gov (United States)

    Georgia State Dept. of Education, Atlanta. Office of School Administrative Services.

    Some of the factors considered in these guidelines include basic nutritional requirements, food component minimums, food variety, and amounts of food served in elementary and secondary school breakfast programs. Suggestions are made for serving foods that will appeal to young people. Samples of hot and cold menus are provided. Forms for evaluating…

  15. Internal Guidelines for interactions with communities and local governments

    International Nuclear Information System (INIS)

    1985-11-01

    These Guidelines provide principles for interactions with local populations. Interaction with communities and local govenments are the responsibility of the Office of Civilian Radioactive Wastes Management program's implementing offices. The Guidelines provide policy direction to these implementing offices, while preserving their ability to tailor local interactions to fit a given situation, taking into account the social and political context and the history of local involvement in the program. Project Offices conduct community and local interactions within overall program resources which must be husbanded prudently. Careful planning by implementing offices should ensure that adequate resources are available to foster effective interactions with local representatives

  16. Bioassay guideline 1: general guidlines for bioassay programs

    International Nuclear Information System (INIS)

    1980-01-01

    This guideline is the first of a series of documents which elaborate criteria for bioassay programs, to be presented as recommendations to the Atomic Energy Control Board. It specifies which workers require routine bioassays, the accuracy and frequency of measurements, the dose levels at which specific actions must be taken, and the documentation required

  17. Mini Project Programming Exams

    DEFF Research Database (Denmark)

    Nørmark, Kurt; Thomsen, Lone Leth; Torp, Kristian

    2008-01-01

    A number of different types of final programming exams used or considered at the Department of Computer Science, Aalborg University, are identified and analyzed. Based on this analysis, a new type of programming exam is introduced called a Mini Project Programming (MIP) exam. MIP is a group...... years. The MIP exam is a compromise between (1) a long problem-based project exam and (2) a short oral or written programming exam. It is concluded that the strengths of MIP are the high degree of realism in the exam assignment and comprehensiveness relative to the course syllabus. The main challenge...

  18. Guideline for financing agricultural biogas projects - Training material for biogas investors: D.3.7, WP 3

    OpenAIRE

    Hahn, H.

    2011-01-01

    There are many good reasons to implement a biogas plant ranging from environmental protection and waste reduction to renewable energy production. It can also include financial and non-financial incentives. Nevertheless, investors of biogas projects should be well informed about different legal requirements and financing possibilities. The guideline will help to analyse a potential biogas investment by describing its most important steps. The guideline starts with the project idea and a first ...

  19. Ecologo guidelines spark disagreement

    International Nuclear Information System (INIS)

    Anon.

    1999-01-01

    Defining what renewable means has been a challenge, but the authors of a new set of guidelines for the Ecologo certification of renewable low-impact electrcity expect after some delay to have the new rules on the street by March 2000.. There was contention in developing the guideline, according to Terra Choice Environmental Services, the company that created and applied criteria for Ecologo certification under the federal government's Environmetal Choice Program. Interim guidleines were developed and have been in place for renewable power since 1996, and have since been used to certify wood-waste biomass, landfill gas, small hydro and wind power plants, in addition to three green power marketing programs. The first draft of the revised guidelines was issued in March. It was one of the harder guidelines to have been worked on because Canadian power producers did not readily agree on what should qualify as renewable, particularly around the whole area of hydro. While small run-of-river hydro plants will continue to fit within the Ecologo guidelines, larger projects will not. Wind power producers are relatively happy with the latest version of TerraChoice's draft guidelines, released at the end of November. A significant revision of the original rules is a limit on the amount of older generation green power marketers who want to promote the green power Ecologo electricity can sell. At least 50% of their capacity must originate from plants installed after January 1, 1991

  20. General guidelines for the assessment of internal dose from monitoring data: Progress of the IDEAS project

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Blanchardon, E.; Cruz-Suarez, R.; Berkovski, V.; Castellani, C. M.; Hurtgenv, C.; Leguen, B.; Malatova, I.; Marsh, J.; Stather, J.; Zeger, J.

    2007-01-01

    In recent major international intercomparison exercises on intake and internal dose assessments from monitoring data, the results calculated by different participants varied significantly. Based on this experience the need for harmonisation of the procedures has been formulated within an EU 5. Framework Programme research project. The aim of the project, IDEAS, is to develop general guidelines for standardising assessments of intakes and internal doses. The IDEAS project started in October 2001 and ended in June 2005. The project is closely related to some goals of the work of Committee 2 of the ICRP and since 2003 there has been close cooperation between the two groups. To ensure that the guidelines are applicable to a wide range of practical situations, the first step was to compile a database of well-documented cases of internal contamination. In parallel, an improved version of an existing software package was developed and distributed to the partners for further use. A large number of cases from the database was evaluated independently by the partners and the results reviewed. Based on these evaluations, guidelines were drafted and discussed with dosimetry professionals from around the world by means of a virtual workshop on the Internet early in 2004. The guidelines have been revised and refined on the basis of the experiences and discussions in this virtual workshop. The general philosophy of the Guidelines is presented here, focusing on the principles of harmonisation, optimisation and proportionality. Finally, the proposed Levels of Task to structure the approach of internal dose evaluation are reported. (authors)

  1. Economic modelling of diagnostic and treatment pathways in National Institute for Health and Care Excellence clinical guidelines: the Modelling Algorithm Pathways in Guidelines (MAPGuide) project.

    Science.gov (United States)

    Lord, J; Willis, S; Eatock, J; Tappenden, P; Trapero-Bertran, M; Miners, A; Crossan, C; Westby, M; Anagnostou, A; Taylor, S; Mavranezouli, I; Wonderling, D; Alderson, P; Ruiz, F

    2013-12-01

    National Institute for Health and Care Excellence (NICE) clinical guidelines (CGs) make recommendations across large, complex care pathways for broad groups of patients. They rely on cost-effectiveness evidence from the literature and from new analyses for selected high-priority topics. An alternative approach would be to build a model of the full care pathway and to use this as a platform to evaluate the cost-effectiveness of multiple topics across the guideline recommendations. In this project we aimed to test the feasibility of building full guideline models for NICE guidelines and to assess if, and how, such models can be used as a basis for cost-effectiveness analysis (CEA). A 'best evidence' approach was used to inform the model parameters. Data were drawn from the guideline documentation, advice from clinical experts and rapid literature reviews on selected topics. Where possible we relied on good-quality, recent UK systematic reviews and meta-analyses. Two published NICE guidelines were used as case studies: prostate cancer and atrial fibrillation (AF). Discrete event simulation (DES) was used to model the recommended care pathways and to estimate consequent costs and outcomes. For each guideline, researchers not involved in model development collated a shortlist of topics suggested for updating. The modelling teams then attempted to evaluate options related to these topics. Cost-effectiveness results were compared with opinions about the importance of the topics elicited in a survey of stakeholders. The modelling teams developed simulations of the guideline pathways and disease processes. Development took longer and required more analytical time than anticipated. Estimates of cost-effectiveness were produced for six of the nine prostate cancer topics considered, and for five of eight AF topics. The other topics were not evaluated owing to lack of data or time constraints. The modelled results suggested 'economic priorities' for an update that differed from

  2. 7 CFR 1210.311 - Programs and projects.

    Science.gov (United States)

    2010-01-01

    ... PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.311 Programs and projects. Programs and projects mean those research, development, advertising, or promotion programs or projects...

  3. Guidelines for Biosafety Training Programs for Workers Assigned to BSL-3 Research Laboratories.

    Science.gov (United States)

    Homer, Lesley C; Alderman, T Scott; Blair, Heather Ann; Brocard, Anne-Sophie; Broussard, Elaine E; Ellis, Robert P; Frerotte, Jay; Low, Eleanor W; McCarthy, Travis R; McCormick, Jessica M; Newton, JeT'Aime M; Rogers, Francine C; Schlimgen, Ryan; Stabenow, Jennifer M; Stedman, Diann; Warfield, Cheryl; Ntiforo, Corrie A; Whetstone, Carol T; Zimmerman, Domenica; Barkley, Emmett

    2013-03-01

    The Guidelines for Biosafety Training Programs for Workers Assigned to BSL-3 Research Laboratories were developed by biosafety professionals who oversee training programs for the 2 national biocontainment laboratories (NBLs) and the 13 regional biocontainment laboratories (RBLs) that participate in the National Institute of Allergy and Infectious Diseases (NIAID) NBL/RBL Network. These guidelines provide a general training framework for biosafety level 3 (BSL-3) high-containment laboratories, identify key training concepts, and outline training methodologies designed to standardize base knowledge, understanding, and technical competence of laboratory personnel working in high-containment laboratories. Emphasis is placed on building a culture of risk assessment-based safety through competency training designed to enhance understanding and recognition of potential biological hazards as well as methods for controlling these hazards. These guidelines may be of value to other institutions and academic research laboratories that are developing biosafety training programs for BSL-3 research.

  4. A Project-based Learning curricular approach in a Production Engineering Program

    Directory of Open Access Journals (Sweden)

    Simone Borges Simão Monteiro

    2017-09-01

    Full Text Available Abstract The Industrial Engineering undergraduate program offered at the University of Brasília was structured on Project Based Learning (PBL methodology. This innovative educational proposal allows the students to deploy their technical competencies through real problem solving situations. The methodology also stimulates the development of the students’ soft skills, by exposing them to a challenging environment. At the end of each project, the results are presented to an external agent, and are subsequently implemented. The objective of this paper is to present the evolution of the PSP courses, which adopt as guidelines both the PMBOK project management framework, as well as content from specific technical courses related to the project’s subject. One other relevant aspect of the PSP courses is their involvement of both undergraduate and graduate students from different Engineering areas, such as Industrial, Mechanical and Civil Engineering, which serves to foster a more holistic and integrated problem-solving skillset.

  5. Recommendations for Guidelines for EMF Personal Exposure Measurements, Rapid Project #4

    Energy Technology Data Exchange (ETDEWEB)

    T. Dan Bracken, Inc.

    1997-08-01

    The purpose of developing guidelines for electric and magnetic field (EMF) personal exposure measurements (lF'EM) is to ensure reliable and comparable data across I?EM studies. Study techniques may vary due to different populations or objectives, but the resulting data should be consistently reported and comparable, to the extent possible. Any guideline must allow creativity by the research-oriented investigator and provide specific guidance to industrial hygienists or other results-oriented investigators, requiring a standard protocol. Recognizing measurement studies with different purposes is an important aspect of these recommendations. The guidelines presented here intend to produce comparable data across studies while remaining flexible. The recommendations for designing and implementing an EMF PEM program describe a three-stage process. The first step is to clearly state the purpose of the PEM program. The next stage addresses the fundamental elements of an EMF PEM study, including an assessment of the scientific and organizational resources that will be required. This process is codified in a written study plan. These stages are described in 1 Section 5 of this report. The third stage of a PEM study involves the design, implementation and documentation of specific procedures and protocols fo~ sampling strategies, selection of measurement parameters; instrumentation, measurement and data collection, data management, data analysis, quality assurance, uncertainty evaluation, and archiving the study methods and results. The methods for designing these elements of an EMF PEM study are described in Section 6: Specific Guidelines for EMF I?EM Study Design.

  6. Comparison of acrylamide intake from Western and guideline based diets using probabilistic techniques and linear programming.

    Science.gov (United States)

    Katz, Josh M; Winter, Carl K; Buttrey, Samuel E; Fadel, James G

    2012-03-01

    Western and guideline based diets were compared to determine if dietary improvements resulting from following dietary guidelines reduce acrylamide intake. Acrylamide forms in heat treated foods and is a human neurotoxin and animal carcinogen. Acrylamide intake from the Western diet was estimated with probabilistic techniques using teenage (13-19 years) National Health and Nutrition Examination Survey (NHANES) food consumption estimates combined with FDA data on the levels of acrylamide in a large number of foods. Guideline based diets were derived from NHANES data using linear programming techniques to comport to recommendations from the Dietary Guidelines for Americans, 2005. Whereas the guideline based diets were more properly balanced and rich in consumption of fruits, vegetables, and other dietary components than the Western diets, acrylamide intake (mean±SE) was significantly greater (Plinear programming and results demonstrate that linear programming techniques can be used to model specific diets for the assessment of toxicological and nutritional dietary components. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. Summary guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Halsnaes, K.; Painuly, J.P.; Turkson, J.; Meyer, H.J.; Markandya, A.

    1999-09-01

    This document is a summary version of the methodological guidelines for climate change mitigation assessment developed as part of the Global Environment Facility (GEF) project Economics of Greenhouse Gas Limitations; Methodological Guidelines. The objectives of this project have been to develop a methodology, an implementing framework and a reporting system which countries can use in the construction of national climate change mitigation policies and in meeting their future reporting obligations under the FCCC. The methodological framework developed in the Methodological Guidelines covers key economic concepts, scenario building, modelling tools and common assumptions. It was used by several country studies included in the project. (au) 13 refs.

  8. Educational Intervention Improves Compliance With AAN Guidelines for Return Epilepsy Visits: A Quality Improvement Project.

    Science.gov (United States)

    Nelson, Gary R; Filloux, Francis M; Kerr, Lynne M

    2016-10-01

    In 2011, the American Academy of Neurology (AAN) released guidelines for return seizure visits detailing 8 points that should be addressed during such visits. These guidelines are designed to improve routine follow-up care for epilepsy patients. The authors performed a quality improvement project aimed at increasing compliance with these guidelines after educating providers about them. The authors performed a chart review before and after an intervention which included: education regarding the guidelines, providing materials to remind providers of the guidelines, and templates to facilitate compliance. The authors reviewed charts at 2 and 6 months after the intervention. Significant improvement in documentation of 4 of the 8 measures was observed after this educational intervention. This suggests that simple educational interventions may help providers change practice and can improve compliance with new guidelines while requiring minimal time and resources to implement. © The Author(s) 2016.

  9. [The German program for disease management guidelines: evaluation by use of quality indicators].

    Science.gov (United States)

    Kopp, Ina B; Geraedts, Max; Jäckel, Wilfried H; Altenhofen, Lutz; Thomeczek, Christian; Ollenschläger, Günter

    2007-08-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) in Germany aims at the implementation of best-practice recommendations for prevention, acute care, rehabilitation and chronic care in the setting of disease management programs and integrated health-care systems. Like other guidelines, DM-CPG need to be assessed regarding their influence on structures, processes and outcomes of care. However, quality assessment in integrated health-care systems is challenging. On the one hand, a multitude of potential domains for measurement, actors and perspectives need to be considered. On the other hand, measures need to be identified that assess the function of the diagnostic and therapeutic chain in terms of cooperation and coordination of care. The article reviews methods and use of quality indicators in the context of the German DM-CPG Program.

  10. Spanish guideline for the definition and assessment of risk-informed inservice inspection programs for piping

    International Nuclear Information System (INIS)

    Figueras, J.M.; Olivar, F.; Mendoza, C.; Vazquez, T.; Morales, L.; Bros, J.; Mach, I.; Gutierrez, E.

    2001-01-01

    The recent emphasis on risk-informed in-service inspection has been taken on by the Spanish Utilities and the Spanish Regulatory Body in their proposal for a co-operation project for defining a Risk-Informed In-Service Inspection Guideline for Piping. This paper describes first the main features of this Spanish guideline and then the results of the pilot applications developed in order to check the consistency of the guideline. (authors)

  11. Spanish guideline for the definition and assessment of risk-informed inservice inspection programs for piping

    Energy Technology Data Exchange (ETDEWEB)

    Figueras, J.M.; Olivar, F.; Mendoza, C.; Vazquez, T. [CSN, Madrid (Spain); Morales, L. [UNESA, Madrid (Spain); Bros, J.; Mach, I. [Tecnatom, Madrid (Spain); Gutierrez, E. [Iberinco, Madrid (Spain)

    2001-07-01

    The recent emphasis on risk-informed in-service inspection has been taken on by the Spanish Utilities and the Spanish Regulatory Body in their proposal for a co-operation project for defining a Risk-Informed In-Service Inspection Guideline for Piping. This paper describes first the main features of this Spanish guideline and then the results of the pilot applications developed in order to check the consistency of the guideline. (authors)

  12. Review of standards and guidelines pertinent to DOE's Remedial Action programs

    International Nuclear Information System (INIS)

    Soldat, J.K.; Denham, D.H.

    1985-01-01

    A number of radiological standards, guidelines, and dose criteria have been promulgated that may be relevant to the Department of Energy's (DOE) Remedial Action programs. Some of these are being applied to remedial actions undertaken by DOE to ensure that health and safety aspects are adequately addressed. Pacific Northwest Laboratory staff reviewed existing and proposed environmental radiological standards and criteria for their applicability to DOE's Remedial Action Programs. National and international environmental standards and criteria, and studies conducted by other DOE contractors were reviewed. The review indicated that there is a lack of uniformity between the dose guidelines developed by the various agencies. A uniform dose standard is needed for DandD, at least as an upper limit with application of the ALARA philosophy. 33 references, 5 tables

  13. THE ARTHRITIS AND MUSCULOSKELETAL QUALITY IMPROVEMENT PROGRAM (AMQUIP: A BREAKTHROUGH SERIES METHODOLOGY PROJECT

    Directory of Open Access Journals (Sweden)

    MASTURA I

    2008-01-01

    Full Text Available The Australian government had funded the National Primary Care Collaborative (NPCC program with funding of $14.6 million over three years. One of the pilots project was the Arthritis and Musculoskeletal Quality Improvement Program (AMQuIP.The study aims to optimize general practitioners (GPs management of patients with osteoarthritis (OA of the hip and knee by identifying gaps between their current practice and best practice. The Breakthrough Series Collaborative methodology with several Plan-Do-Study-Act (PDSA cycles was employed. Participants comprises of 12 GPs/practices from two Victorian Divisions of general Practice (one rural, one metropolitan with 10 patients per GP/practice. GPs/practices attended an orientation and three learning workshops and a videoconference. GPs/practices completed PDSA cycles between workshop and reported results at workshops. GPs/practices reported use of guidelines, change in patient management and change in practice management/systems. All recruited patients completed the SF-12v2 Health Survey and WOMAC OA Index Questionnaire twice. Follow up activities including focus groups and face-to-face interviews were held six months after the final workshop. All GPs/practices used the guidelines/key messages, introduced “new” management strategies to patients, and made positive changes to their practice management/systems. Patient reported positive changes and outcomes. By using a structured methodology and evidence-based guidelines/key messages; GPs can introduce new patient management strategies, and by identifying gaps in practice management systems, positive changes can be achieved.

  14. European Standards and Guidelines in a Nordic Perspective: Joint Nordic Project 2005-2006. ENQA Occasional Papers 11

    Science.gov (United States)

    Vinther-Jorgensen, Tue, Ed.; Hansen, Signe Ploug, Ed.

    2006-01-01

    This report presents the results of the joint 2005-06 project of the Nordic Quality Assurance Network in Higher Education (NOQA). The project focused on the European standards and guidelines for quality assurance agencies, examining them in a Nordic perspective. The project aimed at interpreting and clarifying the European standards and guidelines…

  15. European project for developing general guidelines for harmonising internal dose assessment procedures (IDEAS)

    International Nuclear Information System (INIS)

    Andrasi, A.; Bailey, M.; Puncher, M.; Berkovski, V.; Eric Blanchardon, E.; Jourdain, J.-R.; Carlo-Maria Castellani, C.-M.; Doerfel, H.; Christian Hurtgen, Ch.; Le Guen, B.

    2003-01-01

    Several international intercomparison exercises on intake and internal dose assessments from monitoring data led to the conclusion that the results calculated by different participants varied significantly mainly because of the wide variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need for harmonisation of the procedures has been formulated as an EU research project under the 5 th Framework Programme (2001-2005), with the aim of developing general guidelines for standardising assessments of intakes and internal doses. In the IDEAS project eight institutions from seven European countries are participating using inputs also from internal dosimetry professionals from across Europe to ensure broad consensus in the outcome of the project. The IDEAS project is explained

  16. Impact evaluation of productive use—An implementation guideline for electrification projects

    International Nuclear Information System (INIS)

    Bensch, Gunther; Peters, Jörg; Schmidt, Christoph M.

    2012-01-01

    There is a consensus in the international community that rural electrification and, in particular, the productive use of electricity contributes to poverty alleviation. At the same time, efforts to evaluate the impacts of development projects have increased substantially. This paper provides a hands-on guide for designing evaluation studies regarding the impacts of productive electricity usage. Complementary to the existing literature on evaluation methods, this guide familiarizes project managers with the concrete steps that have to be undertaken to plan and implement an evaluation. The guide comprises three modules based on enterprise surveys and on anecdotal case studies. For each module, the implementation is described on a step-by-step basis including conceptual issues as well as logistics and methodological questions. - Highlights: ► Hands-on evaluation guideline for development project managers. ► Step-by-step procedure on how to implement evaluation. ► Impacts of productive electricity use.

  17. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    .... The Natural Programming Project is developing general principles, methods, and programming language designs that will significantly reduce the amount of learning and effort needed to write programs...

  18. Guidelines for Selection, Screening and Qualification of Low-Voltage Commercial Multilayer Ceramic Capacitors for Space Programs

    Science.gov (United States)

    Teverovsky, Alexander A.

    2012-01-01

    This document has been developed in the course of NASA Electronic Parts and Packaging (NEPP) program and is not an official endorsement of the insertion of commercial capacitors in space programs or an established set of requirements for their testing. The purpose of this document is to suggest possible ways for selection, screening, and qualification of commercial capacitors for NASA projects and open discussions in the parts engineering community related to the use of COTS ceramic capacitors. This guideline is applicable to commercial surface mount chip, simple parallel plate design, multi-layer ceramic capacitors (MLCCs) rated to voltages of 100V and less. Parts with different design, e.g. low inductance ceramic capacitors (LICA), land grid array (LGA) etc., might need additional testing and tailoring of the requirements described in this document. Although the focus of this document is on commercial MLCCs, many procedures discussed below would be beneficial for military-grade capacitors

  19. Radiological protection guidelines for the Formerly Utilized Sites Remedial Action Program and remote Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Gilbert, T.L.

    1985-01-01

    The need for a definitive basis for radiological guidelines and criteria for FUSRAP became apparent by 1981 and led ORO to sponsor a joint ANL/BNI/LANL/ORO effort under the chairmanship of Wayne Hansen (LANL) that resulted in a final FUSRAP radiological guidelines document in March 1983. A separate effort to develop guidelines for remedial action criteria for SFMP was in progress at PNL. The need to coordinate both efforts with impending revisions of DOE Radiological Protection Standards and impending new developments in EPA and NRC Radiological Protection Standards led to convening of the first DOE Workshop on Remedial Action Criteria in Gaithersburg, Maryland, in February 1984, followed by a second workshop in June 1984 at ANL. The major decisions were to base the criteria on dosimetry models and basic limits currently recommended by the International Commission on Radiological Protection, to emphasize the development and use of site-specific rather than generic guidelines and criteria for residual radionuclide concentrations in the ground, and to prepare a manual to accompany the guidelines that would present procedures and tables for deriving site-specific soil guidelines and criteria for the remedial action programs. A joint ANL/LANL/ORNL/PNL effort to prepare a definitive set of guidelines and a manual has been initiated. The scope, status, and current plans for this effort, and some of the key issues, are presented. 10 references, 1 table

  20. Radiological protection guidelines for the Formerly Utilized Sites Remedial Action Program and Remote Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Gilbert, T.L.

    1984-01-01

    The need for a definitive basis for radiological guidelines and criteria for FUSRAP became apparent by 1981 and led ORO to sponsor a joint ANL/BNI/LANL/ORO effort under the chairmanship of Wayne Hansen (LANL) that resulted in a final FUSRAP radiological guidelines document in March 1983. A separate effort to develop guidelines for remedial action criteria for SFMP was in progress at PNL. The need to coordinate both efforts with impending revisions of DOE Radiological Protection Standards and impending new developments in EPA and NRC Radiological Protection Standards led to convening of the first DOE Workshop on Remedial Action Criteria in Gaithersburg, Maryland, in February 1984, followed by a second workshop in June 1984 at ANL. The major decisions were to base the criteria on dosimetry models and basic limits currently recommended by the International Commission on Radiological Protection, to emphasize the development and use of site-specific rather than generic guidelines and criteria for residual radionuclide concentrations in the ground, and to prepare a manual to accompany the guidelines that would present procedures and tables for deriving site-specific soil guidelines and criteria for the remedial action programs. A joint ANL/LANL/ORNL/PNL effort to prepare a definitive set of guidelines and a manual has been initiated. The scope, status, and current plans for this effort, and some of the key issues, are presented. 10 references, 1 table

  1. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  2. The life cycle of a genome project: perspectives and guidelines inspired by insect genome projects.

    Science.gov (United States)

    Papanicolaou, Alexie

    2016-01-01

    Many research programs on non-model species biology have been empowered by genomics. In turn, genomics is underpinned by a reference sequence and ancillary information created by so-called "genome projects". The most reliable genome projects are the ones created as part of an active research program and designed to address specific questions but their life extends past publication. In this opinion paper I outline four key insights that have facilitated maintaining genomic communities: the key role of computational capability, the iterative process of building genomic resources, the value of community participation and the importance of manual curation. Taken together, these ideas can and do ensure the longevity of genome projects and the growing non-model species community can use them to focus a discussion with regards to its future genomic infrastructure.

  3. Reconciling pairs of concurrently used clinical practice guidelines using Constraint Logic Programming.

    Science.gov (United States)

    Wilk, Szymon; Michalowski, Martin; Michalowski, Wojtek; Hing, Marisela Mainegra; Farion, Ken

    2011-01-01

    This paper describes a new methodological approach to reconciling adverse and contradictory activities (called points of contention) occurring when a patient is managed according to two or more concurrently used clinical practice guidelines (CPGs). The need to address these inconsistencies occurs when a patient with more than one disease, each of which is a comorbid condition, has to be managed according to different treatment regimens. We propose an automatic procedure that constructs a mathematical guideline model using the Constraint Logic Programming (CLP) methodology, uses this model to identify and mitigate encountered points of contention, and revises the considered CPGs accordingly. The proposed procedure is used as an alerting mechanism and coupled with a guideline execution engine warns the physician about potential problems with the concurrent application of two or more guidelines. We illustrate the operation of our procedure in a clinical scenario describing simultaneous use of CPGs for duodenal ulcer and transient ischemic attack.

  4. 28 CFR 42.306 - Guidelines.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Guidelines. 42.306 Section 42.306... PROCEDURES Equal Employment Opportunity Program Guidelines § 42.306 Guidelines. (a) Recipient agencies are... guidelines under their equal employment opportunity program which will correct, in a timely manner, any...

  5. Human Research Program Unique Processes, Criteria, and Guidelines (UPCG). Revision C, July 28, 2011

    Science.gov (United States)

    Chin, Duane

    2011-01-01

    This document defines the processes, criteria, and guidelines exclusive to managing the Human Research Program (HRP). The intent of this document is to provide instruction to the reader in the form of processes, criteria, and guidelines. Of the three instructional categories, processes contain the most detail because of the need for a systematic series of actions directed to some end. In contrast, criteria have lesser detail than processes with the idea of creating a rule or principle structure for evaluating or testing something. Guidelines are a higher level indication of a course of action typically with the least amount of detail. The lack of detail in guidelines allows the reader flexibility when performing an action or actions.

  6. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  7. Using "get with the guidelines" to improve cardiovascular secondary prevention.

    Science.gov (United States)

    LaBresh, Kenneth A; Gliklich, Richard; Liljestrand, James; Peto, Randolph; Ellrodt, A Gray

    2003-10-01

    "Get With The Guidelines (GWTG)" was developed and piloted by the American Heart Association (AHA), New England Affiliate; MassPRO, Inc.; and other organizations to reduce the gap in the application of secondary prevention guidelines in hospitalized cardiovascular disease patients. Collaborative learning programs and technology solutions were created for the project. The interactive Web-based patient management tool (PMT) was developed using quality measures derived from the AHA/American College of Cardiology secondary prevention guidelines. It provided data entry, embedded reminders and guideline summaries, and online reports of quality measure performance, including comparisons with the aggregate performance of all hospitals. Multidisciplinary teams from 24 hospitals participated in the 2000-2001 pilot. Four collaborative learning sessions and monthly conference calls supported team interaction. Best-practices sharing and the use of an Internet tool enabled hospitals to change systems and collect data on 1,738 patients. The GWTG program, a template of learning sessions with didactic presentations, best-practices sharing, and collaborative multidisciplinary team meetings supported by the Internet-based data collection and reporting system, can be extended to multiple regions without requiring additional development. Following the completion of the pilot, the AHA adopted GWTG as a national program.

  8. Guia para la Elaboracion y Evaluacion de Proyectos de Investigacion (Guidelines for Reporting and Evaluating Research Projects).

    Science.gov (United States)

    Morles, Victor

    This article establishes guidelines for conducting and evaluating research projects according to a scientific methodology. The organizational format suggested here follows an outline with elements and details that should be considered in an investigation. Each part of the proposed outline is explained, and terms are defined. Project evaluation is…

  9. Coupling computer-interpretable guidelines with a drug-database through a web-based system – The PRESGUID project

    Directory of Open Access Journals (Sweden)

    Fieschi Marius

    2004-03-01

    Full Text Available Abstract Background Clinical Practice Guidelines (CPGs available today are not extensively used due to lack of proper integration into clinical settings, knowledge-related information resources, and lack of decision support at the point of care in a particular clinical context. Objective The PRESGUID project (PREScription and GUIDelines aims to improve the assistance provided by guidelines. The project proposes an online service enabling physicians to consult computerized CPGs linked to drug databases for easier integration into the healthcare process. Methods Computable CPGs are structured as decision trees and coded in XML format. Recommendations related to drug classes are tagged with ATC codes. We use a mapping module to enhance computerized guidelines coupling with a drug database, which contains detailed information about each usable specific medication. In this way, therapeutic recommendations are backed up with current and up-to-date information from the database. Results Two authoritative CPGs, originally diffused as static textual documents, have been implemented to validate the computerization process and to illustrate the usefulness of the resulting automated CPGs and their coupling with a drug database. We discuss the advantages of this approach for practitioners and the implications for both guideline developers and drug database providers. Other CPGs will be implemented and evaluated in real conditions by clinicians working in different health institutions.

  10. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  11. Birds and bird habitats: guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-10-01

    Established in 2009, the Green Energy Act aims to increase the use of renewable energy sources including wind, water, solar and bioenergy in Ontario. The development of these resources is a major component of the province's plan, which aims to mitigate the contribution to climate change and to involve the Ontario's economy in the improvement of the quality of the environment. The Green Energy Act also considers as important the implementation of a coordinated provincial approval process, suggesting the integration of all Ministry requirements into a unique process during the evaluation of newly proposed renewable energy projects. The Ministry of the Environment's Renewable Energy Approval Regulation details the requirements for wind power projects involving significant natural features. Birds are an important part of Ontario's biodiversity and, according to the Ministry of Natural Resources, their habitats are considered as significant wildlife habitat (SWH). The Renewable Energy Approval Regulation and this guideline are meant to provide elements and guidance in order to protect bird SWH during the selection of a location of wind power facilities. . 27 refs., 1 tab., 2 figs.

  12. Reviewing a Reading Program: Professional Development Module. Participant's Guide

    Science.gov (United States)

    Kosanovich, Marcia; Jordan, Georgia; Arndt, Elissa; Van Sciver, Mary; Wahl, Michelle; Rissman, Lila

    2008-01-01

    The Curriculum and Instructional Projects Team at the Florida Center for Reading Research (FCRR) developed "Guidelines for Reviewing a Reading Program" ("Guidelines") to assist reviewers in determining if a program is consistent with the scientific research on reading. Based on that work, the Center on Instruction Reading Strand developed this…

  13. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  14. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  15. [The German program for disease management guidelines. Background, methods, and development process].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina; Lelgemann, Monika; Sänger, Sylvia; Heymans, Lothar; Thole, Henning; Trapp, Henrike; Lorenz, Wilfried; Selbmann, Hans-Konrad; Encke, Albrecht

    2006-10-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 by the German Medical Association (umbrella organization of the German Chambers of Physicians) and joined by the Association of the Scientific Medical Societies (AWMF; umbrella organization of more than 150 professional societies) and by the National Association of Statutory Health Insurance Physicians (NASHIP) in 2003. The program provides a conceptual basis for disease management, focusing on high-priority health-care topics and aiming at the implementation of best practice recommendations for prevention, acute care, rehabilitation and chronic care. It is organized by the German Agency for Quality in Medicine, a founding member of the Guidelines International Network (G-I-N). The main objective of the German DM-CPG Program is to establish consensus of the medical professions on evidence-based key recommendations covering all sectors of health-care provision and facilitating the coordination of care for the individual patient through time and across interfaces. Within the last year, DM-CPGs have been published for asthma, chronic obstructive pulmonary disease, type 2 diabetes, and coronary heart disease. In addition, experts from national patient self-help groups have been developing patient guidance based upon the recommendations for health-care providers. The article describes background, methods, and tools of the DM-CPG Program, and is the first of a publication series dealing with innovative recommendations and aspects of the program.

  16. Drug usage guidelines, Part 3: assessment of acceptance of the program.

    Science.gov (United States)

    Patry, R A; Huber, S L; Rice, G; Hudson, H D; Godwin, H N

    1985-04-01

    The Drug Usage Guidelines (DUG) program, as perceived by the members of the P & T Committee and by physicians who had prepared and submitted DUGs, was demonstrated to be an effective method for evaluating drugs for formulary inclusion. The majority of P & T members felt that the DUG program had strengthened the drug review process without being too tedious or preventing the addition of valuable drugs to the formulary. Sixty-eight percent of physicians who had submitted a DUG expressed the opinion that it served as a vehicle for providing educational information on rational therapeutics. A majority of respondents stated that they would recommend the DUG program to other hospitals.

  17. First experience with a new biomedical engineering program in Slovenia established following the TEMPUS IV CRH-BME joint project guidelines.

    Science.gov (United States)

    Jarm, Tomaz; Miklavcic, Damijan

    2014-01-01

    A new study program of biomedical engineering was recently established at Faculty of Electrical Engineering, University of Ljubljana, Slovenia. It is based on the long-lasting tradition of education in the field of BME at the host institution and is built on the BME areas in which the research groups of the Faculty of Electrical Engineering have been traditionally successful. The program was prepared in accordance with the recommendations of the TEMPUS IV CRH-BME Project consortium.

  18. Assessment of external costs for transport project evaluation: Guidelines in some European countries

    Energy Technology Data Exchange (ETDEWEB)

    Petruccelli, Umberto, E-mail: umberto.petruccelli@unibas.it

    2015-09-15

    Many studies about the external costs generated by the transport system have been developed in the last twenty years. To standardize methodologies and assessment procedures to be used in the evaluation of the projects, some European countries recently have adopted specific guidelines that differ from each other in some aspects even sensibly. This paper presents a critical analysis of the British, Italian and German guidelines and is aimed at cataloguing the external cost types regarded and the assessment methods indicated as well as to highlight the differences of the results, in terms of applicability and reliability. The goal is to contribute to a European standardization process that would lead to the drafting of guidelines suited for all EU countries. - Highlights: • The analyzed guidelines agree on the methods to evaluate costs from air pollution, greenhouse gases and accidents. • They recommend respectively: dose-resp. approach; costs to reduce/permit emissions; whole direct, indirect and social costs. • For noise, DE guide indicates defensive expenditure or SP methods; IT guide, SP method; UK guide, the hedonic prices one. • For on territory impact, DE guide regards only the barrier effect; the IT one, also the soil consumption and system effects. • British guide proposes a qualitative methodology to estimate the impact on various landscapes and environments.

  19. All projects related to | Page 269 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Region: Brazil, South America, Canada, North and Central America, India, Far East Asia, South Korea, Central Asia, South Asia. Program: Networked Economies. Total Funding: CA$ 203,800.00. Adding A2K Principles to the UN Guidelines for Consumer Protection. Project. The United Nations (UN) Guidelines for Consumer ...

  20. The Camp Hill Project: Objectives and Design

    Science.gov (United States)

    Mattingly, John B.

    1976-01-01

    Available from: EC 090 474. Outlined are the problems and objectives of Pennsylvania's Camp Hill Project--a program designed to complete psychological needs assessments for juveniles incarcerated at Camp Hill, to develop project policies and guidelines in preparation for meeting with juvenile court judges, and to hire staff. (SBH)

  1. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  2. A unit-level perspective on the long-term sustainability of a nursing best practice guidelines program: An embedded multiple case study.

    Science.gov (United States)

    Fleiszer, Andrea R; Semenic, Sonia E; Ritchie, Judith A; Richer, Marie-Claire; Denis, Jean-Louis

    2016-01-01

    Best practice guidelines are a tool for narrowing research-to-practice gaps and improving care outcomes. There is some empirical understanding of guideline implementation in nursing settings, yet there has been almost no consideration of the longer-term sustainability of guideline-based practice improvements. Many healthcare innovations are not sustained, underscoring the need for knowledge about how to promote their survival. To understand how a nursing best practice guidelines program was sustained on acute healthcare center nursing units. We undertook a qualitative descriptive case study of an organization-wide nursing best practice guidelines program with four embedded nursing unit subcases. The setting was a large, tertiary/quaternary urban health center in Canada. The nursing department initiated a program to enhance patient safety through the implementation of three guidelines: falls prevention, pressure ulcer prevention, and pain management. We selected four inpatient unit subcases that had differing levels of program sustainability at an average of almost seven years post initial program implementation. Data sources included 39 key informant interviews with nursing leaders/administrators and frontline nurses; site visits; and program-related documents. Data collection and content analysis were guided by a framework for the sustainability of healthcare innovations. Program sustainability was characterized by three elements: benefits, routinization, and development. Seven key factors most accounted for the differences in the level of program sustainability between subcases. These factors were: perceptions of advantages, collaboration, accountability, staffing, linked levels of leadership, attributes of formal unit leadership, and leaders' use of sustainability activities. Some prominent relationships between characteristics and factors explained long-term program sustainability. Of primary importance was the extent to which unit leaders used sustainability

  3. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  4. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  5. Strategy Guideline: Demonstration Home

    Energy Technology Data Exchange (ETDEWEB)

    Savage, C.; Hunt, A.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  6. Strategy Guideline. Demonstration Home

    Energy Technology Data Exchange (ETDEWEB)

    Hunt, A.; Savage, C.

    2012-12-01

    This guideline will provide a general overview of the different kinds of demonstration home projects, a basic understanding of the different roles and responsibilities involved in the successful completion of a demonstration home, and an introduction into some of the lessons learned from actual demonstration home projects. Also, this guideline will specifically look at the communication methods employed during demonstration home projects. And lastly, we will focus on how to best create a communication plan for including an energy efficient message in a demonstration home project and carry that message to successful completion.

  7. [The German Program for Disease Management Guidelines: COPD Guideline 2006. Short review].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina; Lelgemann, Monika

    2007-01-15

    In Germany, the first national consensus on evidence-based recommendations for COPD prevention and disease management was reached in spring 2006. After a development period of 9 months, the National Disease Management Guideline COPD was finalized by nominal group process under the authorship of the scientific societies for pneumology (DGP and Atemwegsliga), general internal medicine (DGIM), family medicine (DEGAM), and the Drug Commission of the German Medical Association (AKDAE). The recommendations' main sources are the NICE COPD Guideline 2004, the GOLD Recommendations as well as existing German guidelines and reviews of recent scientific evidence. The article gives an overview on authors, sources, and key recommendations of the German National Disease Management Guideline COPD 2006 (www.copd.versorgungsleitlinien.de).

  8. 7 CFR 622.5 - Guidelines.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Guidelines. 622.5 Section 622.5 Agriculture... AGRICULTURE WATER RESOURCES WATERSHED PROJECTS General § 622.5 Guidelines. Guidelines for carrying out... Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies issued by...

  9. Mandatory criteria for cardiac rehabilitation programs: 2018 guidelines from the Portuguese Society of Cardiology.

    Science.gov (United States)

    Abreu, Ana; Mendes, Miguel; Dores, Hélder; Silveira, Conceição; Fontes, Paulo; Teixeira, Madalena; Santa Clara, Helena; Morais, João

    2018-04-30

    Cardiac rehabilitation (CR) is a multidisciplinary process for patients recovering after an acute cardiac event or with chronic cardiovascular disease that reduces mortality and morbidity and improves quality of life. It is considered a cost-effective intervention and is expressly indicated in the guidelines of the major medical societies. In Portugal, only 8% of patients discharged from hospital after myocardial infarction are included in CR programs. In Europe overall, the percentage admitted to CR programs is 30%, while in the USA it is 20-30%. In view of the underuse of CR in Portugal, we call the attention of the health authorities to the need to increase the number and national coverage of CR programs, while maintaining high quality standards. The aim is for all patients resident in Portugal who are eligible for CR programs to have the same opportunities for access and attendance. In order to preserve the benefits and safety of this intervention, CR needs to be performed according to international guidelines. The fact that various initiatives in this field have been developed by different professional groups, some of them non-medical, that do not follow the European guidelines, has prompted us to prepare a series of norms defining mandatory criteria for CR, based on current knowledge and evidence. In this way we aim to ensure that the required increase in the number of CR programs, linked in a national network of CR centers, does not detract from the need to maintain their efficacy and quality. These criteria should serve as the basis for the future accreditation of CR centers in Portugal. Copyright © 2018. Publicado por Elsevier España, S.L.U.

  10. The Office Guidelines Applied to Practice program improves secondary prevention of heart disease in Federally Qualified Healthcare Centers

    Directory of Open Access Journals (Sweden)

    Adesuwa Olomu

    2016-12-01

    Office-GAP resulted in increased use of guideline-based medications for secondary CVD prevention in underserved populations. The Office-GAP program could serve as a model for implementing guideline-based care for other chronic diseases.

  11. CDIO Projects in Civil Engineering Study Program at DTU

    DEFF Research Database (Denmark)

    Krogsbøll, Anette; Simonsen, Claus; Christensen, Jørgen Erik

    2011-01-01

    or a design build project on each of the first four semesters. In this paper the four projects in the civil engineering study program are described along with a brief description of the entire study program. The aim is to provide additional information and documentation to accompany an exposition where......In 2008 all Bachelor of engineering study programs at the Technical University of Denmark (DTU) have been adopted to the “Conceive – Design – Implement – Operate” approach. As part of the necessary changes it was decided that all seven study programs should have a cross disciplinary project...... students present their projects. Learning outcomes, training and assessment of personal, professional and social engineering skills are described from a project point of view. Progression of engineering skills is discussed from a study program perspective. The interrelation between the various elements...

  12. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  13. [The German Program for Disease Management Guidelines: CHD Guideline 2006. Short review].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2006-12-15

    In Germany, the first national consensus on evidence-based recommendations for disease management in patients with chronic coronary heart disease was reached in summer 2006. After a development period of 4 years, the National Disease Management Guideline Chronic Coronary Heart Disease was finalized by nominal group process under the authorship of the scientific associations for cardiac rehabilitation (DGPR), cardiac surgery (DGTHG), cardiology (DGK), general internal medicine (DGIM), family medicine (DEGAM), and the Drug Commission of the German Medical Association (AKDAE). The recommendations' main sources are the ACC/AHA guidelines 2002 updates as well as existing German guidelines and reviews of recent scientific evidence. The article gives an overview on authors, sources, and key recommendations of the German National Disease Management Guideline Chronic Coronary Heart Disease 2006 (www.khk.versorgungsleitlinie.de).

  14. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  15. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  16. Airspace Systems Program: Next Generation Air Transportation System Concepts and Technology Development FY2010 Project Plan Version 3.0

    Science.gov (United States)

    Kopardekar, Parimal H.

    2010-01-01

    This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders

  17. Interim radon-resistant construction guidelines for use in Florida-1989. Final report, August 1987-June 1988

    International Nuclear Information System (INIS)

    Pugh, T.D.

    1990-08-01

    The report gives results of a project to investigate, analyze, and develop radon-resistant construction guidelines that are consistent with other building codes and that could be applied to Florida. A literature search resulted in information on radon remediation techniques, new construction methods, and existing radon-resistant building codes such as those in Sweden and Canada. The identified techniques were amended, modified, or supplemented for incorporation into draft model guidelines for new construction in format consistent with the Southern Building Code Congress International, Inc.'s Standard Building Code. A technical review advisory committee formed during development of the guidelines, provided input and recommended changes to the draft guidelines. Although the project has resulted in guidelines for recommended construction practices, they should be coupled with a carefully planned and implemented program of experimentation. Eventually, this approach will lead to building code provisions that are scientifically defensible, cost effective, reliable, and easily incorporated into standard construction practice

  18. The Use of a Well-Designed Instructional Guideline in Online MBA Teaching

    Science.gov (United States)

    Duesing, Robert J.; Ling, Juan; Yang, Jiaqin

    2016-01-01

    This study investigated the positive impact of a teaching practice on student learning outcomes in an online MBA program. An instructional project guideline was developed to help online students enhance their achieving required learning objectives corresponding to five categories of Bloom's Taxonomy. The course learning objectives are based on…

  19. Development of a quality-assurance program for the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Minor, R.C.

    1981-01-01

    A quality assurance program was developed for TSTA with the attempt in mind to satisfy the developmental nature of the project. Numerous reviews replace strict guidelines because guidelines are one of the objectives of the project, not a basis for it. The reviews assure adequate technical consideration and avoid unilateral decisions. Other major requirements of the program plan include interfacing with another quality assurance organization, the assignment of responsibilities, and instructions for the preparation of SDD's. Areas of concern are, in general, budget related, and include receiving inspection and acceptance of items. A software program is only now being established

  20. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  1. Evaluation process of global environmental impact: assessment guidelines

    International Nuclear Information System (INIS)

    Memon, A.R.; Mahar, R.B.

    2001-01-01

    In developed and developing countries, the EIA (Environmental Impact Assessment) is becoming mandatory for the approval of Industrial projects and projects of Environmental hazards. The approving authority of each country has its own guidelines to get projects approved and make project proponents responsible to submit Environmental Impact Statement for the its detailed assessment. In this paper authors have studied an existing EIA Global guidelines and its evaluation process of altogether 40 countries from four continents, Asia, Pacific/Middle East, Europe, Australia and America/Canada. This evaluation process is recorded in the tabulation form and it has been formulated stage wise in which stage one highlights the inception of EIA guidelines of each country and stage two and three gives implementation process. The inception stage of guidelines gives an idea that when EIA was started and an implementation stages provide all information that when EIA become a part of legislation that provide an opportunity to the reader to understand the decision making process for project approvals. The main objective of writing EIA guidelines is to monitor the sustain ability of various types of the projects under different sectoral guidelines, therefore Projects related with different Sectors have been chosen and a detailed record in tabulation form gives an idea to understand the interaction of these guidelines. To make this paper more comprehensive, authors have gone thorough the sectoral guidelines of altogether 64 countries and studied 21 sector oriented project fields. These are of Agriculture/Irrigation, Biodiversity, Coastal/Marine, Community Participation, Extractive industries, Fisheries, Forestry, Hazard Risk, Health, Human settlement, Industry, Multi sectorial, Ports and Harbors, Power, refugees/resettlement, Social, Strategies/Planning, Tourism/Recreational, transportation, Waste Pollution and Wetlands/Water resources. (author)

  2. The minimum information required for a glycomics experiment (MIRAGE) project: sample preparation guidelines for reliable reporting of glycomics datasets.

    Science.gov (United States)

    Struwe, Weston B; Agravat, Sanjay; Aoki-Kinoshita, Kiyoko F; Campbell, Matthew P; Costello, Catherine E; Dell, Anne; Ten Feizi; Haslam, Stuart M; Karlsson, Niclas G; Khoo, Kay-Hooi; Kolarich, Daniel; Liu, Yan; McBride, Ryan; Novotny, Milos V; Packer, Nicolle H; Paulson, James C; Rapp, Erdmann; Ranzinger, Rene; Rudd, Pauline M; Smith, David F; Tiemeyer, Michael; Wells, Lance; York, William S; Zaia, Joseph; Kettner, Carsten

    2016-09-01

    The minimum information required for a glycomics experiment (MIRAGE) project was established in 2011 to provide guidelines to aid in data reporting from all types of experiments in glycomics research including mass spectrometry (MS), liquid chromatography, glycan arrays, data handling and sample preparation. MIRAGE is a concerted effort of the wider glycomics community that considers the adaptation of reporting guidelines as an important step towards critical evaluation and dissemination of datasets as well as broadening of experimental techniques worldwide. The MIRAGE Commission published reporting guidelines for MS data and here we outline guidelines for sample preparation. The sample preparation guidelines include all aspects of sample generation, purification and modification from biological and/or synthetic carbohydrate material. The application of MIRAGE sample preparation guidelines will lead to improved recording of experimental protocols and reporting of understandable and reproducible glycomics datasets. © The Author 2016. Published by Oxford University Press. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  3. 5 CFR 720.206 - Selection guidelines.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Selection guidelines. 720.206 Section 720... guidelines. This subpart sets forth requirements for a recruitment program, not a selection program... procedures and criteria must be consistent with the Uniform Guidelines on Employee Selection Procedures (43...

  4. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  5. The monitoring, evaluation, reporting, and verification of climate change mitigation projects: Discussion of issues and methodologies and review of existing protocols and guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Vine, E.; Sathaye, J.

    1997-12-01

    Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, the US and other countries are implementing, by themselves or in cooperation with one or more other nations (i.e., joint implementation), climate change mitigation projects. These projects will reduce greenhouse gas (GHG) emissions or sequester carbon, and will also result in non-GHG impacts (i.e., environmental, economic, and social impacts). Monitoring, evaluating, reporting, and verifying (MERV) guidelines are needed for these projects in order to accurately determine their net GHG, and other, benefits. Implementation of MERV guidelines is also intended to: (1) increase the reliability of data for estimating GHG benefits; (2) provide real-time data so that mid-course corrections can be made; (3) introduce consistency and transparency across project types and reporters; and (4) enhance the credibility of the projects with stakeholders. In this paper, the authors review the issues and methodologies involved in MERV activities. In addition, they review protocols and guidelines that have been developed for MERV of GHG emissions in the energy and non-energy sectors by governments, nongovernmental organizations, and international agencies. They comment on their relevance and completeness, and identify several topics that future protocols and guidelines need to address, such as (1) establishing a credible baseline; (2) accounting for impacts outside project boundaries through leakage; (3) net GHG reductions and other impacts; (4) precision of measurement; (5) MERV frequency; (6) persistence (sustainability) of savings, emissions reduction, and carbon sequestration; (7) reporting by multiple project participants; (8) verification of GHG reduction credits; (9) uncertainty and risk; (10) institutional capacity in conducting MERV; and (11) the cost of MERV.

  6. Do we need regional guidelines for breast cancer management in the MENA region? MENA Breast Cancer Guidelines project.

    Science.gov (United States)

    Fayed, Reham; Hamza, Dina; Abdallah, Heba; Kelany, Mohamed; Tahseen, Amira; Aref, Adel T

    2017-01-01

    Breast cancer is the most common cancer among females worldwide in general and in the Middle East and the North African region (MENA region) in particular. Management of breast cancer in the MENA region faces a lot of challenges, which include younger age at presentation, aggressive behaviour, lack of national breast screening programmes and lack of reliable data registries as well as socioeconomic factors. These factors make applying the international guidelines for breast cancer management very challenging. The aim of this project is to explore the need for a regional breast cancer guideline as well as to screen the clinical practice of breast cancer management in the MENA region. Three web-based designed surveys were sent to more than 600 oncologists in the MENA region from the period of August 2013 to October 2014. Full descriptive data and information regarding the application of international breast cancer guidelines were collected. The software was using the IP address to prevent duplication of collected data. Descriptive analysis and results were shown as numbers and percentages. During the period of the survey, 104 oncologists responded, representing around an 11% response rate. The majority of replies came from Egypt (59 responses (59%)), followed by Saudi Arabia (ten responses (9.6%)). Fifty-one per cent of responders had more than ten years of experience, and further 31.7% had 5-10 years of experience. Seventy-four per cent were working in governmental hospitals, which is our target sector. There was a major defect in having a genetic counsel unit (78.8% declared an absence of this service), presence of a national breast screening programme (55.8% declared an absence of this service), performing sentinel lymph node biopsy (43.3% declared an absence of this service). The need for regional guidelines for the management of breast cancer was agreed upon by 90.6% of responders. There is a clear need to improve the management of breast cancer in the MENA

  7. 32 CFR 310.36 - OMB training guidelines.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false OMB training guidelines. 310.36 Section 310.36... PROGRAM DOD PRIVACY PROGRAM Training Requirements § 310.36 OMB training guidelines. The OMB guidelines (OMB Privacy Guidelines, 40 FR 28948 (July 9, 1975) require all agencies additionally to: (a) Instruct...

  8. Academy of Program/Project & Engineering Leadership: NASA's Path to Project Management Excellence

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's Path to Project Management Excellence eBook. Leadership plays a critical role in the success of today’s programs and projects. In an increasingly global and...

  9. 7 CFR 1210.331 - Programs and projects.

    Science.gov (United States)

    2010-01-01

    ..., effectuation and administration of appropriate programs or projects for advertising and other sales promotion...; (d) A prohibition on advertising or other promotion programs that make any reference to private brand... PROMOTION PLAN Watermelon Research and Promotion Plan Research and Promotion § 1210.331 Programs and...

  10. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  11. Asia Oceania Guidelines for the Implementation of Programs for Cervical Cancer Prevention and Control

    Directory of Open Access Journals (Sweden)

    Hextan Y. S. Ngan

    2011-01-01

    The primary purpose of these guidelines is to provide information on scientific evidence on the different modalities and approaches of cervical cancer prevention programs, for high resource and low resource settings. The secondary purpose is to provide an overview of the current situation of cervical cancer control and prevention in various Asian Oceania countries: their views of an ideal program, identified obstacles, and suggestions to overcome them are discussed.

  12. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  13. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  14. 23 CFR 650.211 - Guidelines.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Guidelines. 650.211 Section 650.211 Highways FEDERAL..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.211 Guidelines. (a) The FHWA adopts the AASHTO Highway Drainage Guidelines, Volume III, “Erosion and Sediment Control...

  15. 28 CFR 42.404 - Guidelines.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Guidelines. 42.404 Section 42.404... Guidelines. (a) Federal agencies shall publish title VI guidelines for each type of program to which they extend financial assistance, where such guidelines would be appropriate to provide detailed information...

  16. Optical projects in the Clinic program at Harvey Mudd College

    Science.gov (United States)

    Yang, Q.

    2017-08-01

    Clinic program is the senior capstone program at Harvey Mudd College (HMC). Multidisciplinary and industry-sponsored projects allow a team of students to solve a real-world problem over one academic year. Over its 50 plus years, Clinic program has completed numerous optics related projects. This report gives an overview of the Clinic program, reviews recent optical projects and discusses how this program supports the learning of the HMC engineering students. A few sample optical projects with more details are presented to provide an insight of what challenges that undergraduates can overcome. Students achieve learning within the optics discipline and the related engineering disciplines. The experiences in these optical projects indicate the great potential to bringing optical hands-on projects into the undergraduate level. Because of the general engineering curriculum at HMC, these projects often work the best with a multidisciplinary nature even if the core of the project is optically focused. Students gain leadership training, oral and written communication skills and experiences in team work. Close relationship with the sponsor liaisons allows for the students to gain skills in professional conduct, management of tight schedule and a specified budget, and it well prepares the students to their engineering practice. Optical projects have their own sets of specific challenges, so it needs to be chosen properly to match the undergraduate skill sets such as those of HMC engineering students.

  17. Visitor's Computer Guidelines | CTIO

    Science.gov (United States)

    Visitor's Computer Guidelines Network Connection Request Instruments Instruments by Telescope IR Instruments Guidelines Library Facilities Outreach NOAO-S EPO Program team Art of Darkness Image Gallery EPO/CADIAS ‹› You are here CTIO Home » Astronomers » Visitor's Computer Guidelines Visitor's Computer

  18. Research on elaboration of the evaluation guidelines for activities implemented jointly; Kyodo jisshi katsudo hyoka guide line sakutei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Elaboration of the evaluation guidelines for activities implemented jointly (AIJ) was researched to prevent the earth from warming. AIJ is the means to globally promote countermeasures against global warming cost-effectively by optimally combining every country`s technology, know-how and fund. AIJ was established in the 1st Conference of the Parties (COPI) of the United Nations Framework Convention on Climate Change in March, 1995. The pilot phase of AIJ is first carried out by voluntary workers jointly with developing countries under the agreement of the parties. The current situation of activities is reported in COPI as materials for evaluation of AIJ. To promote AIJ, elaboration of the evaluation guidelines for AIJ Japan program is also necessary for Japan. This research arranged the contents of the evaluation guidelines and the method of classifying projects for AIJ Japan program, and carried out some case studies of promising projects to reduce greenhouse gas emission for future proposal. 3 figs., 31 tabs.

  19. Municipal recycling support program. Guide to applicants

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    The Municipal Recycling Support Program stems from the Ontario Ministry of the Environment's policies and programs begun in 1980 aimed at encouraging the development of source separation projects in Ontario. To qualify for financial assistance, municipalities must play a central role in the implementation and ongoing development of recycling; applications will be supported only if there is adequate and reasonable commitment from markets for recovered materials; recycling systems must operate within the framework of a complete waste management system in which cost effectiveness is an important factor; multi-material projects are encouraged as much as possible; and the Ministry will share the costs of projects with the municipalities. The Ministry provides grants for up to 5 years per project to cover the net operating cost of a project up to a specified maximum percentage of eligible gross operating expenses. This manual provides guidelines for applying for such funding, including definitions of eligibility for operating and capital costs, the use of household bins, and guidelines for promotion and advertising, education, demonstration, and feasibility studies.

  20. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  1. Revising the ACS Guidelines for Chemistry Programs in Two-Year Colleges: Shaping the Next Edition

    Science.gov (United States)

    Clevenger, John V.; Wesemann, Jodi L.

    2008-06-01

    Much has changed since the second edition of the ACS Guidelines for Chemistry Programs in Two-Year Colleges was prepared in 1997. The roles that two-year college programs can and do play in providing access to and success in higher education are receiving more attention. Increased knowledge on how people learn, advances in technology, and demands for accountability are changing the educational landscape.

  2. Enhancing system-wide implementation of opioid prescribing guidelines in primary care: protocol for a stepped-wedge quality improvement project.

    Science.gov (United States)

    Zgierska, Aleksandra E; Vidaver, Regina M; Smith, Paul; Ales, Mary W; Nisbet, Kate; Boss, Deanne; Tuan, Wen-Jan; Hahn, David L

    2018-06-05

    Systematic implementation of guidelines for opioid therapy management in chronic non-cancer pain can reduce opioid-related harms. However, implementation of guideline-recommended practices in routine care is subpar. The goal of this quality improvement (QI) project is to assess whether a clinic-tailored QI intervention improves the implementation of a health system-wide, guideline-driven policy on opioid prescribing in primary care. This manuscript describes the protocol for this QI project. A health system with 28 primary care clinics caring for approximately 294,000 primary care patients developed and implemented a guideline-driven policy on long-term opioid therapy in adults with opioid-treated chronic non-cancer pain (estimated N = 3980). The policy provided multiple recommendations, including the universal use of treatment agreements, urine drug testing, depression and opioid misuse risk screening, and standardized documentation of the chronic pain diagnosis and treatment plan. The project team drew upon existing guidelines, feedback from end-users, experts and health system leadership to develop a robust QI intervention, targeting clinic-level implementation of policy-directed practices. The resulting multi-pronged QI intervention included clinic-wide and individual clinician-level educational interventions. The QI intervention will augment the health system's "routine rollout" method, consisting of a single educational presentation to clinicians in group settings and a separate presentation for staff. A stepped-wedge design will enable 9 primary care clinics to receive the intervention and assessment of within-clinic and between-clinic changes in adherence to the policy items measured by clinic-level electronic health record-based measures and process measures of the experience with the intervention. Developing methods for a health system-tailored QI intervention required a multi-step process to incorporate end-user feedback and account for the needs of

  3. Project SAIL: A Summer Program Brings History Alive for Students.

    Science.gov (United States)

    Hollingsworth, Patricia

    2001-01-01

    This project describes Project SAIL (Schools for Active Interdisciplinary Learning), a federally funded project providing in-depth staff development during a 3-week summer program for teachers, parents, and their gifted/talented economically disadvantaged students. The program theme, "Searching for Patterns in History," has been used with students…

  4. Commentary on Stiers and colleagues' guidelines for competency development and measurement in rehabilitation psychology postdoctoral training.

    Science.gov (United States)

    Hatcher, Robert L

    2015-05-01

    Comments on the article, "Guidelines for competency development and measurement in rehabilitation psychology postdoctoral training," by Stiers et al. (see record 2014-55195-001). Stiers and colleagues have provided a thorough and well-conceived set of guidelines that lay out the competencies expected for graduates of postdoctoral residencies in rehabilitation psychology, accompanied by a set of more specific, observable indicators of the residents' competence level. This work is an important aspect of the broader project of the Rehabilitation Psychology Specialty Council (APA Division 22, the American Board of Rehabilitation Psychology, the Foundation for Rehabilitation Psychology, the Academy of Rehabilitation Psychology, and the Council of Rehabilitation Psychology Postdocotral Training Programs) to develop overall guidelines for programs providing postdoctoral training in this field (Stiers et al., 2012). (c) 2015 APA, all rights reserved).

  5. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  6. Poland - Electricity and gas marked development study and practical guidelines for using EU funds. Practical guidelines for using EU funds for energy projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-12-01

    The present report is prepared as part of the project 'Poland - Electricity and gas market development study and practical guidelines for using EU - funds'. The EU structural and cohesion funds are presently considered the most relevant funds concerning support to energy projects. In general, the Polish administration of the EU structural funds is strongly decentralized. The eligible project types to be supported from the various structural funds are described in a number of sector programmes. The sector programmes are described in vertical view, meaning that it is difficult to assess what kind of energy projects are eligible for support and, if eligible, then under which programme. This report presents a horizontal view of the various programmes in order to give an overview of the possibilities of support to energy related projects. The background for this report is a study of the following sector programmes: 1. Improvement of the competitiveness of enterprises. 2. Human resources development. 3. Restructuring and modernization of food sector and rural development. 4. Fisheries and fish processing. 5. Transport - maritime economy. 6. Integrated regional operational programme. 7. Technical assistance. Based on this review, it can be stated that energy projects in general have a low priority but can be supported under various measures within the programmes. (BA)

  7. Internal dose assessments: Uncertainty studies and update of ideas guidelines and databases within CONRAD project

    International Nuclear Information System (INIS)

    Marsh, J. W.; Castellani, C. M.; Hurtgen, C.; Lopez, M. A.; Andrasi, A.; Bailey, M. R.; Birchall, A.; Blanchardon, E.; Desai, A. D.; Dorrian, M. D.; Doerfel, H.; Koukouliou, V.; Luciani, A.; Malatova, I.; Molokanov, A.; Puncher, M.; Vrba, T.

    2008-01-01

    The work of Task Group 5.1 (uncertainty studies and revision of IDEAS guidelines) and Task Group 5.5 (update of IDEAS databases) of the CONRAD project is described. Scattering factor (SF) values (i.e. measurement uncertainties) have been calculated for different radionuclides and types of monitoring data using real data contained in the IDEAS Internal Contamination Database. Based upon this work and other published values, default SF values are suggested. Uncertainty studies have been carried out using both a Bayesian approach as well as a frequentist (classical) approach. The IDEAS guidelines have been revised in areas relating to the evaluation of an effective AMAD, guidance is given on evaluating wound cases with the NCRP wound model and suggestions made on the number and type of measurements required for dose assessment. (authors)

  8. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP

  9. Guidelines to the Development of Human Resources in Libraries: Rationale, Policies, Programs and Recommendations

    Science.gov (United States)

    Library Trends, 1971

    1971-01-01

    It is apparent that there are many roadblocks preventing the release of the human potential in our libraries. These guidelines take the position that a great deal can be done toward diagnosing and removing these roadblocks by establishing and developing meaningful policies and programs. (49 references) (Author/NH)

  10. The new hypertension guidelines.

    Science.gov (United States)

    Stern, Ralph H

    2013-10-01

    The Canadian Hypertension Education Program (CHEP) has published guidelines annually since 2000. The CHEP guidelines are a model of concise, comprehensive, up-to-date, evidence-rated guidelines for physicians who diagnose and treat hypertension. The guidelines address measurement of blood pressure and the definition of hypertension, secondary hypertension evaluation and treatment, and blood pressure targets and medication choices in patients with and without compelling indications. This review describes CHEP's process for developing guidelines and provides an overview of the 2013 recommendations. ©2013 Wiley Periodicals, Inc.

  11. Using Mini-Grants as a Resource to Enrich Gifted Programs.

    Science.gov (United States)

    Adderholdt-Elliott, Miriam; And Others

    1990-01-01

    Guidelines are offered for accessing local grant and foundation monies to fund special and innovative activities in gifted education programs. Descriptions of six projects funded by grants from local foundations demonstrate the variety of projects that can be funded. (JDD)

  12. Vessel based delineation guidelines for the elective lymph node regions in breast cancer radiation therapy – PROCAB guidelines

    International Nuclear Information System (INIS)

    Verhoeven, Karolien; Weltens, Caroline; Remouchamps, Vincent; Mahjoubi, Khalil; Veldeman, Liv; Lengele, Benoit; Hortobagyi, Eszter; Kirkove, Carine

    2015-01-01

    Objective: A national project to improve the quality of breast radiation therapy was started, named PROCAB (PROject on CAncer of the Breast). One of the objectives was to reach a national consensus guideline for the delineation of the regional lymph node areas in breast radiation therapy. Methods: The realization of the new guidelines was a step by step process that started with multiple expert meetings where the existing guidelines were analyzed and the delineations of the lymph node regions were performed together with a surgeon, specialized in the anatomy of the drainage of the breast. Results: The delineation guidelines are vessel-based. Since the occurrence of pathological lymph nodes is typically around the veins, the cranial and caudal borders of all different nodal regions are based on a 5 mm margin around the veins, except for the parasternal lymph node area. Compared to the existing guidelines there are some major changes. Conclusion: With this project a national as well as a European (ESTRO) consensus guideline for the delineation of the regional lymph node areas in breast RT is reached. The new delineation atlas is vessel-based and no longer field-based

  13. Association between postgraduate year 2 residency program characteristics and primary project publication.

    Science.gov (United States)

    Swanson, Joseph M; Shafeeq, Hira; Hammond, Drayton A; Li, Chenghui; Devlin, John W

    2018-03-15

    The association among residency program and research mentor characteristics, program director perceptions, and the publication of the primary research project for postgraduate year 2 (PGY2) graduates was assessed. Using a validated electronic survey, residency program directors (RPDs) of critical care PGY2 graduates were asked about primary research project publication success, program and research project mentor characteristics, and RPDs' perceptions surrounding project completion. All 55 RPDs surveyed responded; 44 (79%) reported being a research project mentor. PGY2 research project publications in 2011 and 2012 totaled 26 (37%) and 27 (35%), respectively. A significant relationship existed between research project publication and the number of residents in the program ( p project publication is important to their employer ( p projects versus no publications included the number of graduates in the PGY2 program (odds ratio [OR], 5.6; p project publication (OR, 10.2; p project versus no research projects was also independently associated with the RPD's perception that the employer valued research project publication (OR, 5.1; p = 0.04). A survey of RPDs of critical care PGY2 residents found that the number of PGY2 residents, the number of publications by the least experienced research mentor, and the perception that publishing the residents' research projects is important to the employer were independently associated with publication rates of residency research projects. Copyright © 2018 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  14. Isolated systems with wind power. An implementation guideline

    DEFF Research Database (Denmark)

    Clausen, Niels-Erik; Bindner, Henrik W.; Frandsen, Sten Tronæs

    2001-01-01

    The overall objective of this research project is to study the development of methods and guidelines rather than "universal solutions" for the use of wind energy in isolated communities. So far most studies of isolated systems with wind power have beencase-oriented and it has proven difficult...... feasibility of isolated power supply systems with wind energy. General guidelines and checklists on which facts and data are needed to carry out a projectfeasibility analysis are presented as well as guidelines how to carry out the project feasibility study and the environmental analysis. The report outlines...... the results of the project as a set of proposed guidelines to be applied when developing a projectcontaining an application of wind in an isolated power system. It is the author's hope that this will facilitate the development of projects and enhance electrification of small rural communities in developing...

  15. 23 CFR 668.215 - Programming and project procedures.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Programming and project procedures. 668.215 Section 668.215 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS EMERGENCY RELIEF PROGRAM Procedures for Federal Agencies for Federal Roads § 668.215 Programming...

  16. Guidelines for postdoctoral training in rehabilitation psychology.

    Science.gov (United States)

    Stiers, William; Hanson, Stephanie; Turner, Aaron P; Stucky, Kirk; Barisa, Mark; Brownsberger, Mary; Van Tubbergen, Marie; Ashman, Teresa; Kuemmel, Angela

    2012-11-01

    This article describes the methods and results of a national conference that was held to (1) develop consensus guidelines about the structure and process of rehabilitation psychology postdoctoral training programs and (2) create a Council of Rehabilitation Psychology Postdoctoral Training Programs to promote training programs' abilities to implement the guidelines and to formally recognize programs in compliance with the guidelines. Forty-six conference participants were chosen to include important stakeholders in rehabilitation psychology, representatives of rehabilitation psychology training and practice communities, representatives of psychology accreditation and certification bodies, and persons involved in medical education practice and research. Consensus guidelines were developed for rehabilitation psychology postdoctoral training program structure and process and for establishing the Council of Rehabilitation Psychology Postdoctoral Training Programs. The Conference developed aspirational guidelines for postdoctoral education and training programs in applied rehabilitation psychology and established a Council of Rehabilitation Psychology Postdoctoral Training Programs as a means of promoting their adoption by training programs. These efforts are designed to promote quality, consistency, and excellence in the education and training of rehabilitation psychology practitioners and to promote competence in their practice. It is hoped that these efforts will stimulate discussion, assist in the development of improved teaching and evaluation methods, lead to interesting research questions, and generally facilitate the continued systematic development of the profession of rehabilitation psychology. PsycINFO Database Record (c) 2012 APA, all rights reserved

  17. CAD-guidelines

    International Nuclear Information System (INIS)

    Schlechtendahl, E.G.; Lang-Lendorff, G.

    1982-10-01

    The CAD-guidelines (CAD = Computer Aided Design) contain rules for programming, structuring and documentation of programs. The standard deals with the structure of CAD-programs, their components, the programming-methods, the language etc. It describes what documents and references are necessary for a CAD-program. In order to gain a broad application of CAD criteria like portability and completeness of the documentation for an effective maintenance are as important as a transparent way of producing CAD-software. (orig.) [de

  18. K-Basins design guidelines

    International Nuclear Information System (INIS)

    Roe, N.R.; Mills, W.C.

    1995-06-01

    The purpose of the design guidelines is to enable SNF and K Basin personnel to complete fuel and sludge removal, and basin water mitigation by providing engineering guidance for equipment design for the fuel basin, facility modifications (upgrades), remote tools, and new processes. It is not intended to be a purchase order reference for vendors. The document identifies materials, methods, and components that work at K Basins; it also Provides design input and a technical review process to facilitate project interfaces with operations in K Basins. This document is intended to compliment other engineering documentation used at K Basins and throughout the Spent Nuclear Fuel Project. Significant provisions, which are incorporated, include portions of the following: General Design Criteria (DOE 1989), Standard Engineering Practices (WHC-CM-6-1), Engineering Practices Guidelines (WHC 1994b), Hanford Plant Standards (DOE-RL 1989), Safety Analysis Manual (WHC-CM-4-46), and Radiological Design Guide (WHC 1994f). Documents (requirements) essential to the engineering design projects at K Basins are referenced in the guidelines

  19. Guidelines for NASA Missions to Engage the User Community as a Part of the Mission Life Cycle

    Science.gov (United States)

    Escobar, V. M.; Friedl, L.; Bonniksen, C. K.

    2017-12-01

    NASA continues to improve the Earth Science Directorate in the areas of thematic integration, stakeholder feedback and Project Applications Program tailoring for missions to transfer knowledge between scientists and projects. The integration of application themes and the implementation of application science activities in flight projects have evolved to formally include user feedback and stakeholder integration. NASA's new Flight Applied Science Program Guidelines are designed to bridge NASA Earth Science Directorates in Flight, Applied Sciences and Research and Development by agreeing to integrate the user community into mission life cycles. Thus science development and science applications will guide all new instruments launched by NASAs ESD. The continued integration with the user community has enabled socio-economic considerations into NASA Earth Science projects to advance significantly. Making users a natural part of mission science leverages future socio-economic impact research and provides a platform for innovative and more actionable product to be used in decision support systems by society. This presentation will give an overview of the new NASA Guidelines and provide samples that demonstrate how the user community can be a part of NASA mission designs.

  20. 15 CFR 1170.4 - Guidelines.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Guidelines. 1170.4 Section 1170.4... ADMINISTRATION, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES § 1170.4 Guidelines. Each... agency actions, activities or programs undertaken in compliance with these guidelines or other laws or...

  1. 1981 Magnetic-fusion theory program project summaries

    International Nuclear Information System (INIS)

    1982-02-01

    The theory program supports research projects at three different types of sites: DOE and other government laboratories, universities, and industrial contractors. This report is organized into three sections corresponding to the three types of sites and within each section is organized alphabetically by site name. Summaries of each program are given

  2. Glaucoma-service provision in Scotland: introduction and need for Scottish Intercollegiate Guidelines Network guidelines.

    Science.gov (United States)

    Syrogiannis, Andreas; Rotchford, Alan P; Agarwal, Pankaj Kumar; Kumarasamy, Manjula; Montgomery, Donald; Burr, Jennifer; Sanders, Roshini

    2015-01-01

    To describe the pattern of glaucoma-service delivery in Scotland and identify areas for improvement, taking into account Scottish General Ophthalmic Services (GOS) arrangements and the Eye Care Integration project, and to design Scottish Intercollegiate Guidelines Network (SIGN) guidelines to refine the primary and secondary interface of glaucoma care. A glaucoma-survey questionnaire was sent to all consultant glaucomatologists in Scotland. The design of SIGN guidelines was based on the results of the questionnaire using SIGN methodology. Over 90% of Scottish glaucoma care is triaged and delivered within hospital services. Despite GOS referral, information is variable. There are no consistent discharge practices to the community. These results led to defined research questions that were answered, thus formulating the content of the SIGN guidelines. The guideline covers the assessment of patients in primary care, referral criteria to hospital, discharge criteria from hospital to community, and monitoring of patients at risk of glaucoma. With increasing age and limitations to hospital resources, refining glaucoma pathways between primary and secondary care has become a necessity. Scotland has unique eye care arrangements with both the GOS and Eye Care Integration project. It is hoped that implementation of SIGN guidelines will identify glaucoma at the earliest opportunity and reduce the rate of false-positive referrals to hospital.

  3. The Effectiveness of a Computer-Tailored E-Learning Program for Practice Nurses to Improve Their Adherence to Smoking Cessation Counseling Guidelines: Randomized Controlled Trial.

    Science.gov (United States)

    de Ruijter, Dennis; Candel, Math; Smit, Eline Suzanne; de Vries, Hein; Hoving, Ciska

    2018-05-22

    Improving practice nurses' (PN) adherence to smoking cessation counseling guidelines will benefit the quality of smoking cessation care and will potentially lead to higher smoking abstinence rates. However, support programs to aid PNs in improving their guideline uptake and adherence do not exist yet. The aim of this study was to assess the effects of a novel computer-tailored electronic learning (e-learning) program on PNs' smoking cessation guideline adherence. A Web-based randomized controlled trial (RCT) was conducted in which an intervention group (N=147) with full access to the e-learning program for 6 months was compared with a control group (N=122) without access. Data collection was fully automated at baseline and 6-month follow-up via online questionnaires, assessing PNs' demographics, work-related factors, potential behavioral predictors based on the I-Change model, and guideline adherence. PNs also completed counseling checklists to retrieve self-reported counseling activities for each consultation with a smoker (N=1175). To assess the program's effectiveness in improving PNs' guideline adherence (ie, overall adherence and adherence to individual counseling guideline steps), mixed linear and logistic regression analyses were conducted, thus accommodating for the smokers being nested within PNs. Potential effect moderation by work-related factors and behavioral predictors was also examined. After 6 months, 121 PNs in the intervention group (82.3%, 121/147) and 103 in the control group (84.4%, 103/122) completed the follow-up questionnaire. Mixed linear regression analysis revealed that counseling experience moderated the program's effect on PNs' overall guideline adherence (beta=.589; 95% CI 0.111-1.068; P Holm-Bonferroni =.048), indicating a positive program effect on adherence for PNs with a more than average level of counseling experience. Mixed logistic regression analyses regarding adherence to individual guideline steps revealed a trend toward

  4. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  5. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  6. Methodological guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Halsnaes, K.; Callaway, J.M.; Meyer, H.J.

    1999-04-01

    The guideline document establishes a general overview of the main components of climate change mitigation assessment. This includes an outline of key economic concepts, scenario structure, common assumptions, modelling tools and country study assumptions. The guidelines are supported by Handbook Reports that contain more detailed specifications of calculation standards, input assumptions and available tools. The major objectives of the project have been provided a methodology, an implementing framework and a reporting system which countries can follow in meeting their future reporting obligations under the FCCC and for GEF enabling activities. The project builds upon the methodology development and application in the UNEP National Abatement Coasting Studies (UNEP, 1994a). The various elements provide countries with a road map for conducting climate change mitigation studies and submitting national reports as required by the FCCC. (au) 121 refs.

  7. Methodological guidelines

    International Nuclear Information System (INIS)

    Halsnaes, K.; Callaway, J.M.; Meyer, H.J.

    1999-01-01

    The guideline document establishes a general overview of the main components of climate change mitigation assessment. This includes an outline of key economic concepts, scenario structure, common assumptions, modelling tools and country study assumptions. The guidelines are supported by Handbook Reports that contain more detailed specifications of calculation standards, input assumptions and available tools. The major objectives of the project have been provided a methodology, an implementing framework and a reporting system which countries can follow in meeting their future reporting obligations under the FCCC and for GEF enabling activities. The project builds upon the methodology development and application in the UNEP National Abatement Coasting Studies (UNEP, 1994a). The various elements provide countries with a road map for conducting climate change mitigation studies and submitting national reports as required by the FCCC. (au) 121 refs

  8. Pu-238 Supply Program Project Execution Plan

    International Nuclear Information System (INIS)

    Wham, Robert M.; Martin, Sherman

    2012-01-01

    This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.

  9. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    Science.gov (United States)

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  10. Youth Education - Programs / Projects

    OpenAIRE

    2004-01-01

    Christine Bozak: 4-H Steers that Work. Rebecca Brooks: Relationship Skills Education. Travis Burke: Defining Competency in the 4-H Professional’s Job. Holly L. Hays Butler: 4-H at the Indiana School for the Deaf . Kevin D. Chilek: Quality Assurance Program for Youth Livestock Exhibitors. Graham Cochran: Lessons from an Innovative Urban Youth Education Center. Steve Cramer: Use Activities Fun and Humor to Teach Character Education. Annette Devitt: Life on the Farm Project. Janet Edwards: Emot...

  11. MG SPROUTS: A Project-in-a-Box Approach to Educational Programming

    Science.gov (United States)

    Dorn,Sheri; Slagle, Krissy

    2016-01-01

    MG SPROUTS was developed as a "project-in-a-box" program, a self-contained educational programming tool for Extension agents working with master gardener Extension volunteers (MGEVs). The program design incorporates programmatic materials and project management materials and follows best management practices for volunteer management. MG…

  12. Isolated systems with wind power. An implementation guideline

    Energy Technology Data Exchange (ETDEWEB)

    Clausen, N.E.; Bindner, H.; Frandsen, S.; Hansen, J.C.; Hansen, L.H.; Lundsager, P.

    2001-06-01

    The overall objective of this research project is to study the development of methods and guidelines rather than 'universal solutions' for the use of wind energy in isolated communities. So far most studies of isolated systems with wind power have been case-oriented and it has proven difficult to extend results from one project to another, not least due to the strong individuality that has characterised such systems in design and implementation. In the present report a unified and generally applicable approach is attempted in order to support a fair assessment of the technical and economical feasibility of isolated power supply systems with wind energy. General guidelines and checklists on which facts and data are needed to carry out a project feasibility analysis are presented as well as guidelines how to carry out the project feasibility study and the environmental analysis. The report outlines the results of the project as a set of proposed guidelines to be applied when developing a project containing an application of wind in an isolated power system. It is the author's hope that this will facilitate the development of projects and enhance electrification of small rural communities in developing countries. (au)

  13. Quality of evidence-based pediatric guidelines

    NARCIS (Netherlands)

    Boluyt, Nicole; Lincke, Carsten R.; Offringa, Martin

    2005-01-01

    Objective. To identify evidence-based pediatric guidelines and to assess their quality. Methods. We searched Medline, Embase, and relevant Web sites of guideline development programs and national pediatric societies to identify evidence-based pediatric guidelines. A list with titles of identified

  14. Quality Assurance program plan - plutonium stabilization and handling project W-460

    International Nuclear Information System (INIS)

    SCHULTZ, J.W.

    1999-01-01

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460

  15. 20 CFR 653.112 - State agency program budget plans.

    Science.gov (United States)

    2010-04-01

    ... the PBP Guidelines which ETA promulgates on an annual basis. (b) Equity indicators shall address JS... year, comparing prior and projected levels of MSFW activity; (3) The ETA program priorities for the...

  16. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    Energy Technology Data Exchange (ETDEWEB)

    Owens, C. M.

    2013-09-01

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  17. Indications and guidelines for mammographic examinations

    International Nuclear Information System (INIS)

    Kalisher, L.; Schaffer, D.

    1977-01-01

    The value of mammography in evaluating the asymptomatic patient has been clearly demonstrated by the HIP program, as well as the National Cancer Institute's breast demonstration projects. A one-third reduction in mortality from breast cancer in mammographically screened women has been substantiated. Nonetheless, questions concerning the long-term effects of repeated radiation exposure associated with mammography have been raised, and for this reason judicious selection of women is urged. In general, women who are asymptomatic or at high risk for breast carcinoma should be evaluated with a planned regimen. Mammographic guidelines and recommendations for attaining the greatest benefit at the lowest possible risk are suggested

  18. Regulatory research and support program for 1993/1994 - project descriptions

    International Nuclear Information System (INIS)

    1993-01-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board's regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year's program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M

  19. Regulatory research and support program for 1993/1994 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board`s regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year`s program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M.

  20. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  1. Guidelines for the prevention of ventilator-associated pneumonia and their implementation. The Spanish "Zero-VAP" bundle.

    Science.gov (United States)

    Álvarez Lerma, F; Sánchez García, M; Lorente, L; Gordo, F; Añón, J M; Álvarez, J; Palomar, M; García, R; Arias, S; Vázquez-Calatayud, M; Jam, R

    2014-05-01

    "Zero-VAP" is a proposal for the implementation of a simultaneous multimodal intervention in Spanish intensive care units (ICU) consisting of a bundle of ventilator-associated pneumonia (VAP) prevention measures. An initiative of the Spanish Societies of Intensive Care Medicine and of Intensive Care Nurses, the project is supported by the Spanish Ministry of Health, and participation is voluntary. In addition to guidelines for VAP prevention, the "Zero-VAP" Project incorporates an integral patient safety program and continuous online validation of the application of the bundle. For the latter, VAP episodes and participation indices are entered into the web-based Spanish ICU Infection Surveillance Program "ENVIN-HELICS" database, which provides continuous information about local, regional and national VAP incidence rates. Implementation of the guidelines aims at the reduction of VAP to less than 9 episodes per 1000 days of mechanical ventilation. A total of 35 preventive measures were initially selected. A task force of experts used the Grading of Recommendations, Assessment, Development and Evaluation Working Group methodology to generate a list of 7 basic "mandatory" recommendations (education and training in airway management, strict hand hygiene for airway management, cuff pressure control, oral hygiene with chlorhexidine, semi-recumbent positioning, promoting measures that safely avoid or reduce time on ventilator, and discouraging scheduled changes of ventilator circuits, humidifiers and endotracheal tubes) and 3 additional "highly recommended" measures (selective decontamination of the digestive tract, aspiration of subglottic secretions, and a short course of iv antibiotic). We present the Spanish VAP prevention guidelines and describe the methodology used for the selection and implementation of the recommendations and the organizational structure of the project. Compared to conventional guideline documents, the associated safety assurance program, the

  2. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  3. 42 CFR 50.208 - Program or project requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Program or project requirements. 50.208 Section 50.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects § 50.208...

  4. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  5. Guidelines on Building Regulations 2008

    DEFF Research Database (Denmark)

    Thse guidelines clarify and intepret the provisions of the Building Regulations of 2008 (BR08). The Guidelines, which match BR08 in terms of organisation into Parts, are accompanied by the full text of the regulations and the explanatory notes issued by the Danish Enterprise and Construction...... Authority. The Guidelines refer the reader to sources such as relevant standards, instructions and other background material which provides more detailed information. The Guidelines cover the same ground as BR08, including building control regulations, layout, fitting out, structures, fire safety, indoor...... climate, energy consumotion and services. The Guidelines are aimed at all professionals involved in building projects, particularly building design consultants, contractors and municipal application officers....

  6. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  7. Energy Efficiency Finance Programs: Use Case Analysis to Define Data Needs and Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Larsen, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kramer, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-07-01

    There are over 200 energy efficiency loan programs—across 49 U.S. states—administered by utilities, state/local government agencies, or private lenders.1 This distributed model has led to significant variation in program design and implementation practices including how data is collected and used. The challenge of consolidating and aggregating data across independently administered programs has been illustrated by a recent pilot of an open source database for energy efficiency financing program data. This project was led by the Environmental Defense Fund (EDF), the Investor Confidence Project, the Clean Energy Finance Center (CEFC), and the University of Chicago. This partnership discussed data collection practices with a number of existing energy efficiency loan programs and identified four programs that were suitable and willing to participate in the pilot database (Diamond 2014).2 The partnership collected information related to ~12,000 loans with an aggregate value of ~$100M across the four programs. Of the 95 data fields collected across the four programs, 30 fields were common between two or more programs and only seven data fields were common across all programs. The results of that pilot study illustrate the inconsistencies in current data definition and collection practices among energy efficiency finance programs and may contribute to certain barriers.

  8. Project Physics Programmed Instruction, Waves 2.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    This is the second of two programmed instruction booklets on the topic of waves, developed by Harvard Project Physics. It covers the relationships among the frequency, period, wavelength, and speed of a periodic wave. For the first booklet in this series, see SE 015 552. (DT)

  9. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  10. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed

  11. Design of training programs for a positive youth development program: Project P.A.T.H.S. in Hong Kong.

    Science.gov (United States)

    Shek, Daniel T L; Chak, Yammy L Y

    2010-01-01

    To facilitate the implementation of the Secondary 1 to Secondary 3 program of the Project P.A.T.H.S. in Hong Kong, systematic training programs are designed for the potential program implementers. The rationales, objectives and design of the Secondary 1 to Secondary 3 training programs are outlined in this paper. The training programs cover theories of adolescent development, positive youth development, background and curricula of the Project P.A.T.H.S., factors affecting program implementation quality and evaluation of the project. Besides introducing the curriculum units, the training programs also focus on nature of learning and related theories (particularly experiential learning), teaching methods and instructional techniques, motivating students, and classroom management.

  12. Using a knowledge translation framework to implement asthma clinical practice guidelines in primary care

    Science.gov (United States)

    Licskai, Christopher; Sands, Todd; Ong, Michael; Paolatto, Lisa; Nicoletti, Ivan

    2012-01-01

    Quality problem International guidelines establish evidence-based standards for asthma care; however, recommendations are often not implemented and many patients do not meet control targets. Initial assessment Regional pilot data demonstrated a knowledge-to-practice gap. Choice of solutions We engineered health system change in a multi-step approach described by the Canadian Institutes of Health Research knowledge translation framework. Implementation Knowledge translation occurred at multiple levels: patient, practice and local health system. A regional administrative infrastructure and inter-disciplinary care teams were developed. The key project deliverable was a guideline-based interdisciplinary asthma management program. Six community organizations, 33 primary care physicians and 519 patients participated. The program operating cost was $290/patient. Evaluation Six guideline-based care elements were implemented, including spirometry measurement, asthma controller therapy, a written self-management action plan and general asthma education, including the inhaler device technique, role of medications and environmental control strategies in 93, 95, 86, 100, 97 and 87% of patients, respectively. Of the total patients 66% were adults, 61% were female, the mean age was 35.7 (SD = ±24.2) years. At baseline 42% had two or more symptoms beyond acceptable limits vs. 17% (Pabsenteeism (5.0 days/year) vs. 19% (3.0 days/year) (P< 0.001). The mean follow-up interval was 22 (SD = ±7) months. Lessons learned A knowledge-translation framework can guide multi-level organizational change, facilitate asthma guideline implementation, and improve health outcomes in community primary care practices. Program costs are similar to those of diabetes programs. Program savings offset costs in a ratio of 2.1:1 PMID:22893665

  13. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  14. 34 CFR 377.1 - What is the Demonstration Projects to Increase Client Choice Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Demonstration Projects to Increase Client... PROJECTS TO INCREASE CLIENT CHOICE PROGRAM General § 377.1 What is the Demonstration Projects to Increase Client Choice Program? The Demonstration Projects to Increase Client Choice Program is designed to...

  15. Design Guidelines for Low Crested Structures

    DEFF Research Database (Denmark)

    Burcharth, H. F.; Lamberti, Alberto

    2004-01-01

    1998-2002. The Guidelines comprise engineering aspects related to morphological impact and structure stability, biological aspects related to ecological impact, and socio-economical aspects related to the implementation of LCS-schemes. The guidelines are limited to submerged and regularly overtopped......The paper presents an overview of the design guidelines for low crested structures (LCS's) to be applied in coastal protection schemes. The design guidelines are formulated as a part of the research project: Environmental Design of Low Crested Coastal Defence Structures (DELOS) within the EC 5FP...

  16. USL/DBMS NASA/PC R and D project system testing standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Kavi, Srinu; Moreau, Dennis R.; Yan, Lin

    1984-01-01

    A set of system testing standards to be used in the development of all C software within the NASA/PC Research and Development Project is established. Testing will be considered in two phases: the program testing phase and the system testing phase. The objective of these standards is to provide guidelines for the planning and conduct of program and software system testing.

  17. Shippingport station decommissioning project ALARA Program

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F.P. [Lockheed Environmental Systems and Technology Co., Houston, TX (United States)

    1995-03-01

    Properly planned and implemented ALARA programs help to maintain nuclear worker radiation exposures {open_quotes}As Low As Reasonably Achievable.{close_quotes}. This paper describes the ALARA program developed and implemented for the decontamination and decommissioning (D&D) of the Shippingport Atomic Power Station. The elements required for a successful ALARA program are discussed along with examples of good ALARA practices. The Shippingport Atomic Power Station (SAPS) was the first commercial nuclear power plant to be built in the United States. It was located 35 miles northwest of Pittsburgh, PA on the south bank of the Ohio river. The reactor plant achieved initial criticality in December 1959. During its 25-year life, it produced 7.5 billion kilowatts of electricity. The SAPS was shut down in October 1982 and was the first large-scale U.S. nuclear power plant to be totally decommissioned and the site released for unrestricted use. The Decommission Project was estimated to take 1,007 man-rem of radiation exposure and $.98.3 million to complete. Physical decommissioning commenced in September 1985 and was completed in September 1989. The actual man-rem of exposure was 155. The project was completed 6 months ahead of schedule at a cost of $91.3 million.

  18. A quality project to improve compliance with AAP guidelines for inpatient management of neonatal hyperbilirubinemia.

    Science.gov (United States)

    Tartaglia, Kimberly M; Campbell, Jessica; Shaniuk, Paul; McClead, Richard E

    2013-07-01

    The goal of this study was to improve compliance with published guidelines regarding management of neonatal hyperbilirubinemia in infants admitted to a general pediatric hospital ward and to improve support for their breastfeeding mothers. This quality improvement project was conducted by using Plan-Do-Study-Act cycles and statistical process control methods. Study subjects were infants > 35 weeks' gestation admitted for hyperbilirubinemia to the general inpatient ward of a large, freestanding pediatric hospital. We developed and implemented a guideline for the inpatient management of jaundiced neonates, with ongoing feedback given to the faculty on group performance. Outcome measures included monthly compliance scores based on American Academy of Pediatrics (AAP) guidelines for management of neonates > 35 weeks' gestation and the percentage of admitted jaundiced, breastfeeding infants whose mothers received lactation consultation during hospitalization. To determine the AAP compliance score, we reviewed and assigned points to each patient admission for completion of a standard evaluation, avoidance of unnecessary intravenous (IV) fluids and peripheral IV line placement, avoidance of rebound bilirubin checks while in the hospital, and the bilirubin level at discharge. Mean monthly AAP compliance scores increased from 60.5% of total possible points during the baseline period (January 2010-December 2010) to 90.4% during the intervention period (January 2011-December 2011). Lactation consultations increased from 48% during our baseline period to 63% during our early intervention period and to 90% during the last 5 months of our intervention. Length of stay was unchanged during the baseline and intervention periods. Interprofessional collaboration between nurses and physicians combined with a thoughtful campaign to increase awareness of published guidelines were successful in improving the care of infants admitted with unconjugated hyperbilirubinemia.

  19. Integrated Human Factors Design Guidelines for Sound Interface

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Lee, Yong Hee; Oh, In Seok; Lee, Hyun Chul; Cha, Woo Chang

    2004-05-01

    Digital MMI, such as CRT, LCD etc., has been used increasingly in the design of main control room of the Korean standard nuclear power plants following the YGN units 3 and 4. The utilization of digital MMI may introduce various kind of sound interface into the control room design. In this project, for five top-level guideline items, including Sound Formats, Alarms, Sound Controls, Communications, and Environments, a total of 147 detail guidelines were developed and a database system for these guidelines was developed. The integrated human factors design guidelines for sound interface and the database system developed in this project will be useful for the design of sound interface of digital MMI in Korean NPPs

  20. Integrated Human Factors Design Guidelines for Sound Interface

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Lee, Yong Hee; Oh, In Seok; Lee, Hyun Chul [KAERI, Daejeon (Korea, Republic of); Cha, Woo Chang [Kumoh National Univ. of Technology, Gumi (Korea, Republic of)

    2004-05-15

    Digital MMI, such as CRT, LCD etc., has been used increasingly in the design of main control room of the Korean standard nuclear power plants following the YGN units 3 and 4. The utilization of digital MMI may introduce various kind of sound interface into the control room design. In this project, for five top-level guideline items, including Sound Formats, Alarms, Sound Controls, Communications, and Environments, a total of 147 detail guidelines were developed and a database system for these guidelines was developed. The integrated human factors design guidelines for sound interface and the database system developed in this project will be useful for the design of sound interface of digital MMI in Korean NPPs.

  1. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  2. Development of human factors design review guidelines

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul

    1997-10-01

    The Objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, Human factors engineering program review model' and '26, Review criteria for human actors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides be ing performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents of NUREG-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we well update the guidelines by reviewing the literature related to alarm design published after 1994

  3. Development of human factors design review guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea)

    1997-10-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: 25. Human Factors Engineering Program Review Model and 26. Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation, which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents of NUREG-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994. (author). 12 refs., 5 figs., 2 tabs.

  4. The Nordic nuclear safety program 1994-1997. Project handbook

    International Nuclear Information System (INIS)

    1997-06-01

    This is a new revision of the handbook for administrators of the Nordic reactor safety program NKS. The most important administrative functions in project management are described, which should secure a uniform management approach in all the projects. The description of the organizational scheme of the NKS and distribution of responsibilities is followed by examples of various administrative routines and document forms. In the annex the names and addresses of the staff involved in administration of the NKS program are listed. (EG)

  5. Does Pay-For-Performance Program Increase Providers Adherence to Guidelines for Managing Hepatitis B and Hepatitis C Virus Infection in Taiwan?

    Science.gov (United States)

    Chen, Huei-Ju; Huang, Nicole; Chen, Long-Sheng; Chou, Yiing-Jenq; Li, Chung-Pin; Wu, Chen-Yi; Chang, Yu-Chia

    2016-01-01

    Many people are concerned about that the quality of preventive care for patients with hepatitis B virus (HBV) and hepatitis C virus (HCV) infection is suboptimal. Taiwan, a hyperendemic area of chronic HBV and HCV infection, implemented a nationwide pay-for-performance (P4P) program in 2010, which aimed to improve the preventive care provided to HBV and HCV patients by increasing physicians' adherence to guidelines through financial incentives. The objective of this study was to evaluate the early effects of the P4P program on utilization of preventive services by HBV and HCV patients. Using a quasi-experimental design with propensity score matching method, we matched the HBV and HCV patients enrolled in the P4P program with non-enrollees in 2010, resulting in 21,643 patients in each group. Generalized estimating equations was applied to examine the difference-in-difference effects of P4P program enrollment on the utilization of three guideline-recommended preventive services (regular outpatient follow-up visits, abdominal ultrasonography (US) examinations, and aspartate aminotransferase and alanine aminotransferase (AST/ALT) tests by HBV and HCV patients. The P4P program enrollees were significantly more likely to attend twice-annual follow-up visits, to receive recommended US examinations and AST/ALT tests, than non-enrollees. The results of our preliminary assessment indicate that financial incentives offered by the P4P program was associated with a modest improvement in adherence to guidelines for better chronic HBV and HBC management.

  6. Guidelines for training and qualification of radiological protection technicians

    International Nuclear Information System (INIS)

    1987-08-01

    These guidelines, used in combination with plant-specific job analysis, provide the framework for a training and qualification program for radiological protection technicians at nuclear power plants. Radiological protection technicians are defined as those individuals, both plant and contractor, who will be engaged in the evaluation of radiological conditions in the nuclear plant and the implementation of the necessary radiological safety measures as they apply to nuclear plant workers and members of the general public. An important aspect of this work is recognizing and handling unusual situations involving radioactivity, including incidents related to degraded core conditions. These guidelines incorporate the results of an industry-wide job analysis and task analysis (JTA) combined with industry operating experience review. However, the industry-wide analyses did not identify all important academic and fundamental knowledge and skills. Further in-depth analysis by subject matter experts produced additional knowledge and skills that were added to these guidelines. All utilities should use these guidelines in conjunction with plant-specific and industry-wide JTA results to develop or validate their radiological protection technician training program. Plant-specific information should be used to establish appropriate training program content. This plant-specific information should reflect unique job duties, equipment, operating experience, and trainee entry-level qualifications. Revisions to these guidelines should be reviewed for applicability and incorporated into the training program using each utility's training system development (TSD) procedures. Plant-specific job analysis and task analysis data is essential to the development of performance-based training programs. These analyses are particularly useful in selecting tasks for training and in developing on-the-job training (OJT), laboratory training, and mock-up training. Qualification programs based on these

  7. 25 CFR 900.5 - Effect of these regulations on Federal program guidelines, manual, or policy directives.

    Science.gov (United States)

    2010-04-01

    ... SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT General Provisions § 900.5 Effect of these regulations... 25 Indians 2 2010-04-01 2010-04-01 false Effect of these regulations on Federal program guidelines, manual, or policy directives. 900.5 Section 900.5 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...

  8. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  9. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  10. The Harvard Project Physics Film Program

    Science.gov (United States)

    Bork, Alfred M.

    1970-01-01

    States the philosophy behind the Harvard Project Physics (HPP) film program. Describes the three long HPP films. Lists the 48 color film loops covering six broad topics, primarily motion and energy. The 8-mm silent loops are synchronized with the text materials. Explains some of the pedagogical possibilities of these film loops. (RR)

  11. Halden Reactor Project Workshop: Understanding Advanced Instrumentation and Controls Issues

    International Nuclear Information System (INIS)

    Beltracchi, L.

    1991-01-01

    A Halden Reactor Project Workshop on 'Understanding Advanced Instrumentation and Controls Issues' was held in Halden, Norway, during June 17-18, 1991. The objectives of the workshop were to (1) identify and prioritize the types of technical information that the Halden Project can produce to facilitate the development of man-machine interface guidelines and (2) to identify methods to effectively integrate and disseminate this information to signatory organizations. As a member of the Halden Reactor Project, the Nuclear Regulatory Commission (NRC) requested the workshop. This request resulted from the NRC's need for human factors guidelines for the evaluation of advanced instrumentation and controls. The Halden Reactor Project is a cooperative agreement among several countries belonging to the Organization for Economic Cooperation and Development (OECD). The US began its association with the Halden Project in 1958 through the Atomic Energy Commission. The project's activities are centered at the Halden heavy-water reactor and its associated man-machine laboratory in Halden, Norway. The research program conducted at Halden consists of studies on fuel performance and computer-based man-machine interfaces

  12. Instructional Guidelines. Welding.

    Science.gov (United States)

    Fordyce, H. L.; Doshier, Dale

    Using the standards of the American Welding Society and the American Society of Mechanical Engineers, this welding instructional guidelines manual presents a course of study in accordance with the current practices in industry. Intended for use in welding programs now practiced within the Federal Prison System, the phases of the program are…

  13. RSK-guidelines for PWR reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The RSK guidelines for PWA reactors of April 24, 1974, have been revised and amended in this edition. The RSK presents a summary of safety requirements to be observed in the design, construction, and operation of PWR reactors in the form of guidelines. From January 1979 onwards these guidelines will be the basis of siting and safety considerations for new PWR reactors, and newly built nuclear power plants will have to form these guidelines. They are not binding for existing nuclear power plants under construction or in operation. It will be a matter of individual discussion whether or not the guidelines will be applied in these plants. The main purpose of the guidelines is to facilitate discussion among RSK members and to give early information on necessary safety requirements. If the guidelines are observed by producers and operators, the RSK will make statements on individual projects at short notice. (orig./HP) [de

  14. 32 CFR 806b.2 - Basic guidelines.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Basic guidelines. 806b.2 Section 806b.2 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.2 Basic guidelines. This part implements the Privacy Act of 1974...

  15. TMI-2 Vessel Investigation Project Metallurgical Program

    International Nuclear Information System (INIS)

    Diercks, D.R.; Neimark, L.A.

    1990-01-01

    The TMI-2 [Three Mile Island unit 2] Vessel Investigation Project Metallurgical Program at Argonne National Laboratory is a part of the international TMI-2 Vessel Investigation Project being conducted jointly by the U.S. Nuclear Regulatory Commission and the Organization for Economic Co-operation and Development (OECD). The overall project consists of three phases, namely (1) recovery of material samples from the lower head of the TMI-2 reactor, (2) examination and analysis of the lower head samples and the preparation and testing of archive material subjected to a similar thermal history, and (3) procurement, examination, and analysis of companion core material located adjacent to or near the lower head material. The specific objectives of the ANL Metallurgical Program, which accounts for a major portion of Phase 2, are to prepare metallographic and mechanical test specimen blanks from the TMI-2 lower head material, prepare similar test specimen blanks from suitable archive material subjected to the appropriate thermal processing, determine the mechanical properties of the lower vessel head and archive materials under the conditions of the core-melt accident, and assess the lower head integrity and margin-to-failure during the accident. The ANL work consists of three tasks: (1) archive materials program, (2) fabrication of metallurgical and mechanical test specimens from the TMI-2 pressure vessel samples, and (3) mechanical property characterization of TMI-2 lower pressure vessel head and archive material

  16. Adherence to Cancer Screening Guidelines and Predictors of Improvement Among Participants in the Kansas State Employee Wellness Program

    OpenAIRE

    Hui, Siu-kuen Azor; Engelman, Kimberly K.; Shireman, Theresa I.; Ellerbeck, Edward F.

    2013-01-01

    Introduction Employee wellness programs (EWPs) have been used to implement worksite-based cancer prevention and control interventions. However, little is known about whether these programs result in improved adherence to cancer screening guidelines or how participants’ characteristics affect subsequent screening. This study was conducted to describe cancer screening behaviors among participants in a state EWP and identify factors associated with screening adherence among those who were initia...

  17. CDIO Projects in DTU’s B.Eng. in IT Study Program

    DEFF Research Database (Denmark)

    Sparsø, Jens; Bolander, Thomas; Fischer, Paul

    2011-01-01

    Since the fall 2008 all B.Eng. study programs at the Technical University of Denmark have been based on the CDIO concept. The adoption of the CDIO standards and principles resulted in new or significantly revised study programs. As part of this effort design-build projects have been introduced...... on each of the first 4 semesters, and each semester-project spans several courses. The aim of this paper is to describe the four CDIO semester projects in the B.Eng. in IT study, and – along with similar papers describing the other six B.Eng. programs – to provide documentation to accompany an exposition...

  18. Guidelines for zoo and aquarium veterinary medical programs and veterinary hospitals.

    Science.gov (United States)

    Backues, Kay; Clyde, Vickie; Denver, Mary; Fiorello, Christine; Hilsenroth, Rob; Lamberski, Nadine; Larson, Scott; Meehan, Tom; Murray, Mike; Ramer, Jan; Ramsay, Ed; Suedmeyer, Kirk; Whiteside, Doug

    2011-03-01

    These guidelines for veterinary medical care and veterinary hospitals are written to conform with the requirements of the Animal Welfare Act, which states that programs of disease prevention and parasite control, euthanasia, and adequate veterinary care shall be established and maintained under the supervision of a veterinarian. Ideally the zoo and aquarium should be providing the best possible veterinary medical care for the animals in their collections. Many of these animals are rare and endangered and the institutions should endeavor both to provide for the long term health and well being of these animals and to advance the field of non-domestic animal medicine. It is hoped that this publication will aid in this process.

  19. Using a knowledge translation framework to implement asthma clinical practice guidelines in primary care.

    Science.gov (United States)

    Licskai, Christopher; Sands, Todd; Ong, Michael; Paolatto, Lisa; Nicoletti, Ivan

    2012-10-01

    Quality problem International guidelines establish evidence-based standards for asthma care; however, recommendations are often not implemented and many patients do not meet control targets. Initial assessment Regional pilot data demonstrated a knowledge-to-practice gap. Choice of solutions We engineered health system change in a multi-step approach described by the Canadian Institutes of Health Research knowledge translation framework. Implementation Knowledge translation occurred at multiple levels: patient, practice and local health system. A regional administrative infrastructure and inter-disciplinary care teams were developed. The key project deliverable was a guideline-based interdisciplinary asthma management program. Six community organizations, 33 primary care physicians and 519 patients participated. The program operating cost was $290/patient. Evaluation Six guideline-based care elements were implemented, including spirometry measurement, asthma controller therapy, a written self-management action plan and general asthma education, including the inhaler device technique, role of medications and environmental control strategies in 93, 95, 86, 100, 97 and 87% of patients, respectively. Of the total patients 66% were adults, 61% were female, the mean age was 35.7 (SD = ± 24.2) years. At baseline 42% had two or more symptoms beyond acceptable limits vs. 17% (P< 0.001) post-intervention; 71% reported urgent/emergent healthcare visits at baseline (2.94 visits/year) vs. 45% (1.45 visits/year) (P< 0.001); 39% reported absenteeism (5.0 days/year) vs. 19% (3.0 days/year) (P< 0.001). The mean follow-up interval was 22 (SD = ± 7) months. Lessons learned A knowledge-translation framework can guide multi-level organizational change, facilitate asthma guideline implementation, and improve health outcomes in community primary care practices. Program costs are similar to those of diabetes programs. Program savings offset costs in a ratio of 2.1:1.

  20. Regulatory research and support program for 1988/89 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-15

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information.

  1. Regulatory research and support program for 1988/89 - project descriptions

    International Nuclear Information System (INIS)

    1988-01-01

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information

  2. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  3. Industry guidelines for the calibration of maximum anemometers

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, B.H. [AWS Scientific, Inc., Albany, NY (United States)

    1996-12-31

    The purpose of this paper is to report on a framework of guidelines for the calibration of the Maximum Type 40 anemometer. This anemometer model is the wind speed sensor of choice in the majority of wind resource assessment programs in the U.S. These guidelines were established by the Utility Wind Resource Assessment Program. In addition to providing guidelines for anemometers, the appropriate use of non-calibrated anemometers is also discussed. 14 refs., 1 tab.

  4. Academy of Program/Project & Engineering Leadership Annual Publications

    Data.gov (United States)

    National Aeronautics and Space Administration — Academy of Program/Project & Engineering Leadership's Annual Report highlights the Academy's efforts to serve the NASA workforce's needs in adapting to the...

  5. [The German program for disease management guidelines: type 2 diabetes--diabetic retinopathy/maculopathy guideline 2006. Short review].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina; Thole, Henning; Lelgemann, Monika

    2007-02-15

    In Germany, the first national consensus between six medical scientific associations on evidence-based recommendations for prevention and therapy of retinopathy/maculopathy in type 2 diabetes was reached in fall 2006. The recommendations' main sources are the NICE Retinopathy Guideline 2002, and existing German guidelines and reviews of recent scientific evidence. The article gives an overview on authors, sources, and key recommendations of the German National Disease Management Guideline Type 2 Diabetes-Retinopathy/Maculopathy 2006 (www.diabetes.versorgungsleitlinien.de).

  6. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  7. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    Pasquini, L.A.

    1986-01-01

    The purpose of the Shippingport Station Decommissioning Project (SSDP) is to place the Shippingport Atomic Power Station in a long-term radiologically safe condition following defueling of the reactor, to perform decommissioning in such a manner as to demonstrate to the nuclear industry the application of decommissioning procedures to a large scale nuclear power plant, and to provide useful planning data for future decommissioning projects. This paper describes the Technology Transfer Program for collecting and archiving the decommissioning data base and its availability to the nuclear industry

  8. Best Practice No 177: Best practice guideline: writing a business case for service development in pathology.

    Science.gov (United States)

    Galloway, M J

    2004-04-01

    This guideline reviews the introduction and development of business planning in the National Health Service. A guideline for writing a business case for service development that would form part of a pathology business plan has been developed. This guideline outlines six steps that are required in the preparation of a business case. The format of the guideline has been developed largely from other national guidelines that have been published for the development of capital projects. In view of the publication of these guidelines, the scope of this guideline excludes business cases for information, management, and technology projects and large capital projects.

  9. Manual for implementing residual radioactivity guidelines

    International Nuclear Information System (INIS)

    Gilbert, T.L.; Eckerman, K.F.; Hansen, W.R.; Healy, J.W.; Kennedy, W.E.; Napier, B.A.; Solday, J.K.

    1986-01-01

    The US Department of Energy (DOE) has recently issued guidelines for residual radioactivity at Formerly Utilized Sites Remedial Action Program (FUSRAP) and remote Surplus Facilities Management Program (SFMP) sites. A manual for implementing these guidelines has been prepared jointly by four DOE laboratories (ANL, LANL, ORNL, and PNL) and is being issued as a supplement to the guidelines. The manual presents procedures and tables for deriving site-specific guidelines for levels of residual radionuclide concentrations in soil that must not be exceeded if a site is to be released for unrestricted use. Guidance for implementing DOE ALARA policy for remedial actions is also included. The concentration factor method is used in the pathway analysis for deriving soil guidelines. The analysis has been structured in a manner that explicitly identifies all of the factors involved. Tables are provided for dose-conversion factors and pathway factors from which environmental transport factors for each radionuclide and pathway may be calculated. The scenarios used for deriving the environmental transport factors and dose conversion factors, and the manner in which the information provided in the manual is used to derive site-specific soil guidelines will be presented

  10. Development of human factors design review guidelines(II)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea)

    1998-06-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: 25. Human Factors Engineering Program Review Model and 26. Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation, which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents of NUREG-0711. We also computerized the Korean version of NUREG-0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm systems. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994. (author). 11 refs., 2 figs., 2 tabs.

  11. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    Science.gov (United States)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  12. Health physics program for the Edgemont Uranium Mill decommissioning project

    International Nuclear Information System (INIS)

    Polehn, J.L.; Wallace, R.G.; Reed, R.P.; Wilson, G.T.

    1986-01-01

    The Tennessee Valley Authority (TVA) is actively involved in decommissioning a uranium mill located near the town of Edgemont, South Dakota. The Edgemont Mill Decommissioning Project, which is unique in many respects, will involve dismantlement of the old inactive mill building and excavation and transportation of several million tons of uranium mill tailings to a permanent disposal site. To ensure that workers are adequately protected from radiation exposure during decommissioning operations, a health physics program appropriate for the decommissioning situation was developed. The Edgemont Mill Decommissioning Project Health Physics Manual (HPM) gives the programmatic requirements for worker radiation protection. The requirements of the HPM are implemented by means of detailed onsite operating procedures. The Edgemont project health physics program was developed using currently available regulations and guidance for an operating uranium mill with appropriate modifications for decommissioning. This paper discusses the development, implementation, and documentation of that program

  13. Project Icarus: Stakeholder Scenarios for an Interstellar Exploration Program

    Science.gov (United States)

    Hein, A. M.; Tziolas, A. C.; Osborne, R.

    The Project Icarus Study Group's objective is to design a mainly fusion-propelled interstellar probe. The starting point are the results of the Daedalus study, which was conducted by the British Interplanetary Society during the 1970's. As the Daedalus study already indicated, interstellar probes will be the result of a large scale, decade-long development program. To sustain a program over such long periods, the commitment of key stakeholders is vital. Although previous publications identified political and societal preconditions to an interstellar exploration program, there is a lack of more specific scientific and political stakeholder scenarios. This paper develops stakeholder scenarios which allow for a more detailed sustainability assessment of future programs. For this purpose, key stakeholder groups and their needs are identified and scientific and political scenarios derived. Political scenarios are based on patterns of past space programs but unprecedented scenarios are considered as well. Although it is very difficult to sustain an interstellar exploration program, there are scenarios in which this seems to be possible, e.g. the discovery of life within the solar system and on an exoplanet, a global technology development program, and dual-use of technologies for defence and security purposes. This is a submission of the Project Icarus Study Group.

  14. Stripa Project - Summary of defined programs

    International Nuclear Information System (INIS)

    Carlsson, L.; Olsson, T.; Pusch, R.

    1980-11-01

    An international cooperation project, the Stripa Project, in the field of nuclear waste management has been established as an autonomous OECH/NEA project. The management of the project has been entrusted to the Divsion Nuclear Fuel Safety (KBS) of the Swedish Nuclear Fuel Supply Company (SKBF). Technical input and contribution of funds are given by the following countries: Canada, Finland, Japan, Sweden, Switzerland and the United States. The report summarizes the programs for investigations funded at this stage. A number of investigations of a geophysical, geochemical and hydraulic nature will be carried out in the boreholes and the drill cores will be mapped and analysed. Another experiment is with various tracers which represent all important types of radionuclides and will be introduced in the naturally flowing water in a single fissure in granite. The experiment will show how well sorption data from the laboratory can be used to predict radionuclide migration in the field with real surfaces and waters. The third project aims at the verification of the suitability of the buffer materials at real conditions on site. Highly compacted bentonite and mixtures of bentonite and quartz sand are proposed as buffer materials in final repositories for high-level radioactive wastes. (GB)

  15. The siting guidelines, 10 CFR Part 960

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1991-01-01

    The Siting Guidelines, 10 CFR Part 960, have played a major role in the U.S. Department of Energy's (the Department) Office of Civilian Radioactive Waste Management siting program since their development and implementation in response to the Nuclear Waste Policy Act of 1982. According to the Act, the Siting Guidelines were applicable to the selection of sites for characterization. The Nuclear Waste Policy Amendments Act of 1987 (the Amendments Act) has selected the Yucca Mountain, Nevada, site for characterization from among those nominated according to the Siting Guidelines. Thus, the Amendments Act has taken the repository program beyond the phase of Siting Guidelines applicability, making the U.S. Nuclear Regulatory Commission's 10 CFR Part 60 the applicable regulation. However, the Department has chosen to make use of aspects of the Siting Guidelines in the Site Characterization Plan for the Yucca Mountain Site. (author) 4 figs., 11 refs

  16. Program Evaluation - Automotive Lightweighting Materials Program Research and Development Projects Assessment of Benefits - Case Studies No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Das, S.

    2003-01-23

    This report is the second of a series of studies to evaluate research and development (R&D) projects funded by the Automotive Lightweighting Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The objectives of the program evaluation are to assess short-run outputs and long-run outcomes that may be attributable to the ALM R&D projects. The ALM program focuses on the development and validation of advanced technologies that significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. Funded projects range from fundamental materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R&D projects were chosen for this evaluation: Design and Product Optimization for Cast Light Metals, Durability of Lightweight Composite Structures, and Rapid Tooling for Functional Prototyping of Metal Mold Processes. These projects were chosen because they have already been completed. The first project resulted in development of a comprehensive cast light metal property database, an automotive application design guide, computerized predictive models, process monitoring sensors, and quality assurance methods. The second project, the durability of lightweight composite structures, produced durability-based design criteria documents, predictive models for creep deformation, and minimum test requirements and suggested test methods for establishing durability properties and characteristics of random glass-fiber composites for automotive structural composites. The durability project supported Focal Project II, a validation activity that demonstrates ALM program goals and reduces the lead time for bringing new technology into the marketplace. Focal

  17. Advanced control room design review guidelines: Integration of the NUREG-0700 guidelines and development of new human-system interface guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Carter, R.J.

    1997-07-01

    This report documents the work conducted in four tasks of the Nuclear Regulatory Commission (NRC) project entitled Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation. The purpose of the first task was to integrate the applicable sections of NUREG-0700 into the advanced control room design review (ACRDR) guidelines to ensure that all applicable guidelines are together in one document and conveniently accessible to users. The primary objective of the second task was to formulate a strategy for the development of new ACRDR guidelines that have not otherwise been identified. The main focus of the third task was to modify the individual ACRDR guidelines generated to date to ensure that they are suitable for the intended nuclear power plant (NPP) control station system application. The goal of the fourth task was to develop human factors guidelines for two human-system interface categories that are missing from the current ACRDR guidelines document. During the first task those areas in NUREG-0700 that are not addressed by the ACRDR guidelines document were identified, the areas were subsequently reviewed against six recent industry human factors engineering review guidelines, and the NUREG-0700 guidelines were updated as necessary. In the second task 13 general categories of human-system interface guidelines that are either missing from or not adequately addressed by the ACRDR document were discovered. An approach was derived for the development of new ACRDR guidelines, a preliminary assessment of the available sources that may be useful in the creation of new guidelines and their applicability to the identified human-system interface categories was performed, and an estimate was made of the amount of time and level of effort required to complete the development of needed new ACRDR guidelines. During the third task those NPP control station systems to which the NUREG-0700 and ACRDR guidelines apply were identified, matrices of such

  18. Advanced control room design review guidelines: Integration of the NUREG-0700 guidelines and development of new human-system interface guidelines

    International Nuclear Information System (INIS)

    Carter, R.J.

    1997-07-01

    This report documents the work conducted in four tasks of the Nuclear Regulatory Commission (NRC) project entitled Review Criteria for Human Factors Aspects of Advanced Controls and Instrumentation. The purpose of the first task was to integrate the applicable sections of NUREG-0700 into the advanced control room design review (ACRDR) guidelines to ensure that all applicable guidelines are together in one document and conveniently accessible to users. The primary objective of the second task was to formulate a strategy for the development of new ACRDR guidelines that have not otherwise been identified. The main focus of the third task was to modify the individual ACRDR guidelines generated to date to ensure that they are suitable for the intended nuclear power plant (NPP) control station system application. The goal of the fourth task was to develop human factors guidelines for two human-system interface categories that are missing from the current ACRDR guidelines document. During the first task those areas in NUREG-0700 that are not addressed by the ACRDR guidelines document were identified, the areas were subsequently reviewed against six recent industry human factors engineering review guidelines, and the NUREG-0700 guidelines were updated as necessary. In the second task 13 general categories of human-system interface guidelines that are either missing from or not adequately addressed by the ACRDR document were discovered. An approach was derived for the development of new ACRDR guidelines, a preliminary assessment of the available sources that may be useful in the creation of new guidelines and their applicability to the identified human-system interface categories was performed, and an estimate was made of the amount of time and level of effort required to complete the development of needed new ACRDR guidelines. During the third task those NPP control station systems to which the NUREG-0700 and ACRDR guidelines apply were identified, matrices of such

  19. Guidelines for Inter-Enterprise Management (IEM), GLOBEMEN Deliverable D23

    DEFF Research Database (Denmark)

    Tølle, Martin; Vesterager, Johan

    2002-01-01

    This document is a deliverable of Work package 2 of the IMS Globemen (GMN) project: D23 Guidelines for Inter-Enterprise Management (IEM). IMS Globemen is an inter-regional project aiming to develop methods, tools and architectures to support inter-enterprise operations in one-of-kind industries......-Project, the developed solution for Inter-Enterprise Management. The structure of the deliverable is as follows: - Chapter 1 introduces the guidelines and outlines the structure of the deliverable - Chapter 2 defines key terms along with a list of acronyms used in the deliverable - Chapter 3 gives a general introduction...... for inter-enterprise management (IEM). - Chapter 5 contains the actual Guidelines The chapter contains guidelines for how to prepare enterprise network in being able to set up and manage virtual enterprises. The section consists of a set of activities an enterprise should/could consider when preparing...

  20. Sustainable design guidelines to support the Washington State ferries terminal design manual : design guideline application and refinement.

    Science.gov (United States)

    2013-08-01

    The Sustainable Design Guidelines were developed in Phase I of this research program (WA-RD : 816.1). Here we are reporting on the Phase II effort that beta-tested the Phase I Guidelines on : example ferry terminal designs and refinements made ...

  1. Fire protection guidelines for nuclear power plants

    International Nuclear Information System (INIS)

    1976-06-01

    Guidelines acceptable to the NRC staff for implementing in the development of a fire protection program for nuclear power plants. The purpose of the fire protection program is to ensure the capability to shut down the reactor and maintain it in a safe shutdown condition and to minimize radioactive releases to the environment in the event of a fire. If designs or methods different from the guidelines presented herein are used, they must provide fire protection comparable to that recommended in the guidelines. Suitable bases and justification should be provided for alternative approaches to establish acceptable implementaion of General Design Criterion 3

  2. Railway projects prioritisation for investment : application of goal programming

    OpenAIRE

    Ahern, Aoife; Anandarajah, Gabrial

    2007-01-01

    This research develops a weighted integer goal-programming model for prioritising railway projects for investment. The goal of the model is to prioritise the identified projects for investment while maximising the objectives and meeting the budget limit for capital investment. The model minimises the goal deviations of the objectives. The objectives of the model include quantitative and qualitative attributes. The model is applied to prioritise the new railway projects, which have a total cos...

  3. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What kinds of projects are supported by this program...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of Projects Does the Secretary Assist Under This Program? § 637.11 What kinds of...

  4. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  5. Voluntary reporting of greenhouse gases under Section 1605(b) of the Energy Policy Act of 1992: General Guidelines

    International Nuclear Information System (INIS)

    1994-10-01

    Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, Congress authorized a voluntary program for the public to report achievements in reducing those gases. This document offers guidance on recording historic and current greenhouse gas emissions, emissions reductions, and carbon sequestration. Under the Energy Policy Act (EPAct) reporters will have the opportunity to highlight specific achievements. If you have taken actions to lessen the greenhouse gas effect, either by decreasing greenhouse gas emissions or by sequestering carbon, the Department of Energy (DOE) encourages you to report your achievements under this program. The program has two related, but distinct parts. First, the program offers you an opportunity to report your annual emissions of greenhouse gases. Second, the program records your specific projects to reduce greenhouse gas emissions and increase carbon sequestration. Although participants in the program are strongly encouraged to submit reports on both, reports on either annual emissions or emissions reductions and carbon sequestration projects will be accepted. These guidelines and the supporting technical documents outline the rationale for the program and approaches to analyzing emissions and emissions reduction projects. Your annual emissions and emissions reductions achievements will be reported

  6. Towards European urinalysis guidelines. Introduction of a project under European Confederation of Laboratory Medicine.

    Science.gov (United States)

    Kouri, T T; Gant, V A; Fogazzi, G B; Hofmann, W; Hallander, H O; Guder, W G

    2000-07-01

    Improved standardized performance is needed because urinalysis continues to be one of the most frequently requested laboratory tests. Since 1997, the European Confederation of Laboratory Medicine (ECLM) has been supporting an interdisciplinary project aiming to produce European urinalysis guidelines. More than seventy clinical chemists, microbiologists and ward-based clinicians, as well as representatives of manufacturers are taking part. These guidelines aim to improve the quality and consistency of chemical urinalysis, particle counting and bacterial culture by suggesting optimal investigative processes that could be applied in Europe. The approach is based on medical needs for urinalysis. The importance of the pre-analytical stage for total quality is stressed by detailed illustrative advice for specimen collection. Attention is also given to emerging automated technology. For cost containment reasons, both optimum (ideal) procedures and minimum analytical approaches are suggested. Since urinalysis mostly lacks genuine reference methods (primary reference measurement procedures; Level 4), a novel classification of the methods is proposed: comparison measurement procedures (Level 3), quantitative routine procedures (Level 2), and ordinal scale examinations (Level 1). Stepwise strategies are suggested to save costs, applying different rules for general and specific patient populations. New analytical quality specifications have been created. After a consultation period, the final written text will be published in full as a separate document.

  7. Evaluation of a Pain Management Education Program and Operational Guideline on Nursing Practice, Attitudes, and Pain Management.

    Science.gov (United States)

    Bonkowski, Sara L; De Gagne, Jennie C; Cade, Makia B; Bulla, Sally A

    2018-04-01

    Nurses lack adequate pain management knowledge, which can result in poorly managed postsurgical pain. This study aimed to develop, implement, and evaluate pain management education and operational guidelines to improve nursing knowledge and pain management. This quality improvement project employed convenience samples of surgical oncology nurses and postoperative patients. The intervention involved an online module, live education, and operational guideline for pain management. Nurses completed pre- and postintervention practice and attitudes surveys. Random chart reviews of intravenous narcotic administrations the day before discharge were completed to evaluate whether narcotic administration changed after intervention. Readmissions and Hospital Consumer Assessment of Healthcare Providers and Systems data were collected to determine whether the intervention influenced patient satisfaction. A statistically significant improvement in nursing practice and intravenous narcotic administrations demonstrated changes to pain management practices employed by the nursing staff. Although not statistically significant, fewer pain-related readmissions occurred postintervention. Findings demonstrate that targeted pain management continuing education, paired with operational guidelines, improves nursing practice and decreases intravenous narcotic administrations prior to discharge. J Contin Educ Nurs. 2018;49(4):178-185. Copyright 2018, SLACK Incorporated.

  8. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  9. TMI-2 Vessel Investigation Project (VIP) Metallurgical Program

    International Nuclear Information System (INIS)

    Diercks, D.R.; Neimark, L.A.

    1990-06-01

    The TMI-2 Vessel Investigation Project (VIP) Metallurgical Program is a part of the international TMI-2 Vessel Investigation Project being conducting jointly by the US Nuclear Regulatory Commission and the Organization for Economic Co-operation and Development (OECD). The overall project consists of three phases, namely (1) recovery of material samples from the lower head of the TMI-2 reactor, (2) examination and analysis of the lower head samples and the preparation and testing of archive material subjected to a similar thermal history, and (3) procurement, examination, and analysis of companion core material located adjacent to or near the lower head material. The specific objectives of the ANL Metallurgical Program, which comprises a major portion of Phase 2, are to prepare metallographic and mechanical test specimen blanks from the TMI-2 lower head material, prepare similar test specimen blanks from suitable archive material subjected to the appropriate thermal processing, determine the mechanical properties of the lower vessel head and archive materials under the conditions of the core-melt accident, and assess the lower head integrity and margin-to-failure during the accident. The ANL work consists of three tasks: (1) archive materials program, (2) fabrication of metallurgical and mechanical test specimens from the TMI-2 pressure vessel samples, and (3) mechanical property characterization of TMI-2 lower pressure vessel head and archive material

  10. Geothermal Energy Research and Development Program; Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-03-01

    This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

  11. SEAFOOD MERCHANDISING, A GUIDE FOR TRAINING PROGRAMS.

    Science.gov (United States)

    BEAUMONT, JOHN A.

    GUIDELINES ARE SUGGESTED FOR THE PROMOTION AND ORGANIZATION OF TRAINING PROGRAMS THAT WILL AID IN THE ORDERLY DISTRIBUTION OF FISHERY PRODUCTS TO THE CONSUMER. THE MATERIAL WAS DEVELOPED AS A RESULT OF A RESEARCH PROJECT CONDUCTED BY THE EDUCATIONAL SERVICE BUREAU AND THE DISTRIBUTIVE EDUCATION SERVICE OF TEMPLE UNIVERSITY. CHAPTERS IN THE GUIDE…

  12. Numerical and experimental investigation of geometric parameters in projection welding

    DEFF Research Database (Denmark)

    Kristensen, Lars; Zhang, Wenqi; Bay, Niels

    2000-01-01

    parameters by numerical modeling and experimental studies. SORPAS, an FEM program for numerical modeling of resistance welding, is developed as a tool to help in the phase of product design and process optimization in both spot and projection welding. A systematic experimental investigation of projection...... on the numerical and experimental investigations of the geometric parameters in projection welding, guidelines for selection of the geometry and material combinations in product design are proposed. These will be useful and applicable to industry.......Resistance projection welding is widely used for joining of workpieces with almost any geometric combination. This makes standardization of projection welding impossible. In order to facilitate industrial applications of projection welding, systematic investigations are carried out on the geometric...

  13. Implementing a Project-Based Learning Model in a Pre-Service Leadership Program

    Science.gov (United States)

    Albritton, Shelly; Stacks, Jamie

    2016-01-01

    This paper describes two instructors' efforts to more authentically engage students in a preservice leadership program's course called Program Planning and Evaluation by using a project-based learning approach. Markham, Larmer, and Ravitz (2003) describe project-based learning (PjBL) as "a systematic teaching method that engages students in…

  14. Working group reports: Evaluation of the evidence to support practice guidelines for nutritional care of preterm infants-the Pre-B Project

    Science.gov (United States)

    The "Evaluation of the Evidence to Support Practice Guidelines for the Nutritional Care of Preterm Infants: The Pre-B Project" is the first phase in a process to present the current state of knowledge and to support the development of evidence-informed guidance for the nutritional care of preterm an...

  15. Asia Oceania Guidelines for the Implementation of Programs for Cervical Cancer Prevention and Control

    Science.gov (United States)

    Ngan, Hextan Y. S.; Garland, Suzanne M.; Bhatla, Neerja; Pagliusi, Sonia R.; Chan, Karen K. L.; Cheung, Annie N. Y.; Chu, Tang-Yuan; Domingo, Efren J.; Qiao, You Lin; Park, Jong Sup; Tay, Eng Hseon; Supakarapongkul, Wisit

    2011-01-01

    This paper aims to provide evidence-based recommendations for health professionals, to develop a comprehensive cervical cancer program for a clinic, a community, or a country. Ensuring access to healthcare is the responsibility of all societies, and the Asia Oceania Research Organisation in Genital Infections and Neoplasia (AOGIN) is committed to working collaboratively with governments and health professionals to facilitate prevention programs, to protect girls and women from cervical cancer, a disease that globally affects 500,000 and kills nearly 300,000 women annually, just over half of whom are in the Asia Oceania region. We share the vision that a comprehensive program of vaccination, screening, and treatment should be made accessible to all girls and women in the world. The primary purpose of these guidelines is to provide information on scientific evidence on the different modalities and approaches of cervical cancer prevention programs, for high resource and low resource settings. The secondary purpose is to provide an overview of the current situation of cervical cancer control and prevention in various Asian Oceania countries: their views of an ideal program, identified obstacles, and suggestions to overcome them are discussed. PMID:21559068

  16. Asia Oceania Guidelines for the Implementation of Programs for Cervical Cancer Prevention and Control

    International Nuclear Information System (INIS)

    Ngan, H. Y. S.; Chan, K. K. L.; Cheung, A. N. Y.; Garland, S. M.

    2011-01-01

    This paper aims to provide evidence-based recommendations for health professionals, to develop a comprehensive cervical cancer program for a clinic, a community, or a country. Ensuring access to health care is the responsibility of all societies, and the Asia Oceania Research Organisation in Genital Infections and Neoplasia (AOGIN) is committed to working collaboratively with governments and health professionals to facilitate prevention programs, to protect girls and women from cervical cancer, a disease that globally affects 500,000 and kills nearly 300,000 women annually, just over half of whom are in the Asia Oceania region. We share the vision that a comprehensive program of vaccination, screening, and treatment should be made accessible to all girls and women in the world. The primary purpose of these guidelines is to provide information on scientific evidence on the different modalities and approaches of cervical cancer prevention programs, for high resource and low resource settings. The secondary purpose is to provide an overview of the current situation of cervical cancer control and prevention in various Asian Oceania countries: their views of an ideal program, identified obstacles, and suggestions to overcome them are discussed.

  17. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  18. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  19. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  20. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  1. Therapeutic outcomes monitoring: application of pharmaceutical care guidelines to community pharmacy.

    Science.gov (United States)

    Grainger-Rousseau, T J; Miralles, M A; Hepler, C D; Segal, R; Doty, R E; Ben-Joseph, R

    1997-01-01

    To design a pharmaceutical care model, and develop and field test a set of community pharmacy guidelines and practice support materials--Therapeutic Outcomes Monitoring (TOM) modules. Concept interviews with pharmacists, physicians, and patients; development and field testing of practice guidelines. Community pharmacies. Five independent, five chain, and two clinic site pharmacies. A prototype TOM module for asthma was developed through a seven-step process. Concept interviews were held with pharmacists, physicians, and patients to determine the desirability and feasibility of the TOM concept, prototype, and materials. Two field tests were completed and modifications made. Results were gathered through further concept interviews at the completion of the second field tests. Participants' opinions and experiences. Pharmacists, physicians, and patients expressed favorable attitudes about community pharmacists' participation in this pharmaceutical care model. Of the 12 participating pharmacists, 7 successfully implemented TOM in their practice sites and participated in the project throughout the testing; 49 patients were recruited into the study; and 22 patients remained in the program at the end of the second field test. In providing TOM services to these patients, the two most problematic areas for the pharmacists were in documenting care and reporting to physicians. A final phase of the TOM project has not been conducted in the United States because of insufficient numbers of patients for evaluating patient outcomes. The TOM project was successful from a technical but not a marketing perspective. Useful practice guidelines can be written and taught to pharmacists. Enrollment of patients was difficult, and the concept is not likely to spread spontaneously within the existing market for pharmaceutical services.

  2. Radiotherapy procedures quality control program: Guidelines established by the Spanish Society of Radiotherapy and Oncology

    International Nuclear Information System (INIS)

    Palacios, A.; Pardo, J.; Valls, A.; Petschen, I.; Castell, A.; Villar, A.; Pedro Olive, B.A.; Munoz, V.; Fernandez, J.; Rodriguez, R.; Oton, C.

    2001-01-01

    The main purpose of the Royal Decree 1566/1998 of July 17 th , is to establish the quality criteria in radiation therapy in order to assure the optimisation of both radiation oncology treatments and radiation protection of the patients. According to this decree, the implementation of a quality control program in the radiation oncology departments is imperative. This program must be in writing and always available for supervision of health authorities. When necessary, modifications to improve non-optimal procedures or equipment will be made. The Spanish Society of Radiotherapy and Oncology, in order to co-operate and facilitate to all its members, set up a task force focussing on elaborating a set of guidelines that every single Radiation Oncology Department could use to develop its own quality control program. No agreements regarding equipment quality control were made by the Commission, in spite they are a part of the quality control program in radiotherapy, because it is considered that they correspond to members of other scientific societies. (author)

  3. Summary results of an assessment of research projects in the National Photovoltaics Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Office of Energy Research (OER) undertook an assessment of 115 research projects (listed in Appendix A) sponsored by the National Photovoltaics Program. The Program is located within the Office of Energy Efficiency and Renewable Energy (EE). This report summarizes the results of that review. The Office of Solar Energy Conversion is responsible for the management of the National Photovoltaics Program. This program focuses on assisting US industry in development of fundamental technology to bring advanced photovoltaic energy systems to commercial use. The purpose of the assessment was to determine the following: (1) the quality of research of individual projects; (2) the impact of these individual projects on the mission of the program; and (3) the priority of future research opportunities.

  4. Development of human factors design review guidelines(III)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1999-02-15

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994.

  5. Development of human factors design review guidelines(III)

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul

    1999-02-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994

  6. Development of human factors design review guidelines(II)

    International Nuclear Information System (INIS)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul

    1998-06-01

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994

  7. Development of human factors design review guidelines(III)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jung Woon; Oh, In Suk; Suh, Sang Moon; Lee, Hyun Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1999-02-15

    The objective of this study is to develop human factors engineering program review guidelines and alarm system review guidelines in order to resolve the two major technical issues: '25, human factors engineering program review model' and '26, review criteria for human factors aspects of advanced controls and instrumentation', which are related to the development of human factors safety regulation guides being performed by KINS. For the development of human factors program review guidelines, we made a Korean version of NUREG-0711 and added our comments by considering Korean regulatory situation and reviewing the reference documents NUREG--0711, additional comments, and selected portion of the reference documents for the developer of safety regulation guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guides in KINS to see the contents comparatively at a glance and use them easily. For the development of alarm system review guidelines, we made a Korean version of NUREG/CR-6105, which was published by NRC in 1994 as a guideline document for the human factors review of alarm system. Then we will update the guidelines by reviewing the literature related to alarm design published after 1994.

  8. Assessment of Lean Construction Principles: A Case Study at Semarang Medical Centre Hospital Project

    Directory of Open Access Journals (Sweden)

    Matias Roy Adi Wijaya

    2016-06-01

    Full Text Available The lean construction frameworks have been developed for years to enhance the poor performance of Indonesian project delivery system which influenced by the waste of non-value adding activities. Never the less most of the developments were limited on working process and lack in people empowerment. Toyota Way which integrate working process optimization and people empowerment, was developed as a lean construction frame works. This paper aimed to assess the implementation of Toyota Way principles in project delivery system by observing project’s delivery current state (status quo. The assessment began by conducting a questionnaire survey about Toyota Way implementation which then validated by interview with involved stakeholders and field observation. The assessment showed that project’s stakeholders were still unfamiliar with Toyota Way concept. Although some Toyota Way guidelines have been used in projects completion process such as visual management and training program, it found that those guidelines had not fully implemented. The project delivery system was lack of process focus and concerns more on relationship inter-parties. It also found thatToyota Way implementation will constrained by the difficulties to change the status quo of project delivery. Moreover, it seems that construction projects need practical guidelines to simplify the Toyota Way implementation in project delivery system such as project flow evaluation and system of reflection.

  9. SALTON SEA SCIENTIFIC DRILLING PROJECT: SCIENTIFIC PROGRAM.

    Science.gov (United States)

    Sass, J.H.; Elders, W.A.

    1986-01-01

    The Salton Sea Scientific Drilling Project, was spudded on 24 October 1985, and reached a total depth of 10,564 ft. (3. 2 km) on 17 March 1986. There followed a period of logging, a flow test, and downhole scientific measurements. The scientific goals were integrated smoothly with the engineering and economic objectives of the program and the ideal of 'science driving the drill' in continental scientific drilling projects was achieved in large measure. The principal scientific goals of the project were to study the physical and chemical processes involved in an active, magmatically driven hydrothermal system. To facilitate these studies, high priority was attached to four areas of sample and data collection, namely: (1) core and cuttings, (2) formation fluids, (3) geophysical logging, and (4) downhole physical measurements, particularly temperatures and pressures.

  10. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  11. The AGREE Enterprise: a decade of advancing clinical practice guidelines.

    Science.gov (United States)

    Makarski, Julie; Brouwers, Melissa C

    2014-08-15

    The original AGREE (Appraisal of Guidelines for REsearch and Evaluation) Instrument was published in 2003, and its revision, the AGREE II, in 2009. Together, they filled an important gap in the guideline and quality of care fields. Ten years later, the AGREE Enterprise reflects on a trajectory of projects and international collaboration that have contributed to advancing the science and quality of practice guidelines and the uptake of AGREE/AGREE II. The AGREE Enterprise has undertaken activities to improve the tool and to develop resources to support its use. Since 2003, the uptake and adoption of AGREE by the international community has been swift and broad. A total of 33 language translations of the original AGREE Instrument and the current AGREE II are available and were initiated by the international community. A recent scan of the published literature identified over 600 articles that referenced the AGREE tools. The AGREE tools have been widely received and applied, with several organizations having incorporated the AGREE as part of their formal practice guideline programs. Since its redevelopment in 2010, the AGREE Enterprise website (www.agreetrust.org) continues to experience steady increases in visitors per month and currently has over 10,000 registered users. The AGREE Enterprise has contributed to the advancements of guidelines through research activities and international participation by scientific and user communities. As we enter a new decade, we look forward to ongoing collaborations and contributing to further advancements to improve quality of care and health care systems.

  12. Materials Development Program: Ceramic Technology Project bibliography, 1984--1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    The Ceramic Technology [for Advanced Heat Engines] Project was begun in 1983 to meet the ceramic materials needs of the companion DOE automotive engine program, the Advanced Gas Turbine (AGT) project, and the Heavy Duty Transport (low-heat-rejection, heavy-duty diesel) project. Goal is to develop an industry technology base for reliable and cost effective ceramics for applications in advanced automotive gas turbine and diesel engines. Research areas were identified following extensive input from industry and academia. Majority of research is done by industry (60%); work is also done at colleges and universities, in-house, and at other national laboratories and government agencies. In the beginning, reliability of ceramic components was the key issue. The reliability issues have largely been met and, at the present time, cost is the driving issue, especially in light of the highly cost-sensitive automotive market. Emphasis of the program has now been shifted toward developing cost-effective ceramic components for high-performance engines in the near-term. This bibliography is a compilation of publications done in conjunction with the Ceramic Technology Project since its beginning. Citations were obtained from reports done by participants in the project. We have tried to limit citations to those published and easily located. The end date of 1992 was selected.

  13. 49 CFR 350.339 - What are tolerance guidelines?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false What are tolerance guidelines? 350.339 Section 350... MOTOR CARRIER SAFETY ASSISTANCE PROGRAM Funding § 350.339 What are tolerance guidelines? Tolerance guidelines set forth the limited deviations from the FMCSRs allowed in your State's laws and regulations...

  14. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  15. Adherence to cancer screening guidelines and predictors of improvement among participants in the Kansas State Employee Wellness Program.

    Science.gov (United States)

    Hui, Siu-kuen Azor; Engelman, Kimberly K; Shireman, Theresa I; Ellerbeck, Edward F

    2013-07-11

    Employee wellness programs (EWPs) have been used to implement worksite-based cancer prevention and control interventions. However, little is known about whether these programs result in improved adherence to cancer screening guidelines or how participants' characteristics affect subsequent screening. This study was conducted to describe cancer screening behaviors among participants in a state EWP and identify factors associated with screening adherence among those who were initially nonadherent. We identified employees and their dependents who completed health risk assessments (HRAs) as part of the Kansas state EWP in both 2008 and 2009. We examined baseline rates of adherence to cancer screening guidelines in 2008 and factors associated with adherence in 2009 among participants who were initially nonadherent. Of 53,095 eligible participants, 13,222 (25%) participated in the EWP in 2008 and 6,205 (12%) participated in both years. Among the multiyear participants, adherence was high at baseline to screening for breast (92.5%), cervical (91.8%), and colorectal cancer (72.7%). Of participants who were initially nonadherent in 2008, 52.4%, 41.3%, and 33.5%, respectively, became adherent in the following year to breast, cervical, and colorectal cancer screening. Suburban/urban residence and more frequent doctor visits predicted adherence to breast and colorectal cancer screening guidelines. The effectiveness of EWPs for increasing cancer screening is limited by low HRA participation rates, high rates of adherence to screening at baseline, and failure of nonadherent participants to get screening. Improving overall adherence to cancer screening guidelines among employees will require efforts to increase HRA participation, stronger interventions for nonadherent participants, and better access to screening for rural employees.

  16. Alcohol consumption and low-risk drinking guidelines among adults: a cross-sectional analysis from Alberta's Tomorrow Project.

    Science.gov (United States)

    Brenner, Darren R; Haig, Tiffany R; Poirier, Abbey E; Akawung, Alianu; Friedenreich, Christine M; Robson, Paula J

    2017-12-01

    Moderate to heavy alcohol consumption is a risk factor for all-cause mortality and cancer incidence. Although cross-sectional data are available through national surveys, data on alcohol consumption in Alberta from a large prospective cohort were not previously available. The goal of these analyses was to characterize the levels of alcohol consumption among adults from the Alberta's Tomorrow Project in the context of cancer prevention guidelines. Furthermore, we conducted analyses to examine the relationships between alcohol consumption and other high-risk or risk-related behaviours. Between 2001 and 2009, 31 072 men and women aged 35 to 69 years were enrolled into Alberta's Tomorrow Project, a large provincial cohort study. Data concerning alcohol consumption in the past 12 months were obtained from 26 842 participants who completed self-administered health and lifestyle questionnaires. We conducted cross-sectional analyses on daily alcohol consumption and cancer prevention guidelines for alcohol use in relation to sociodemographic factors. We also examined the combined prevalence of alcohol consumption and tobacco use, obesity and comorbidities. Approximately 14% of men and 12% of women reported alcohol consumption exceeding recommendations for cancer prevention. Higher alcohol consumption was reported in younger age groups, urban dwellers, those with higher incomes and those who consumed more red meat. Moreover, volume of daily alcohol consumption was positively associated with current tobacco use in both men and women. Overall, men were more likely to fall in the moderate and high-risk behavioural profiles and show higher daily alcohol consumption patterns compared to women. Despite public health messages concerning the adverse impact of alcohol consumption, a sizeable proportion of Alberta's Tomorrow Project participants consumed alcohol in excess of cancer prevention recommendations. Continued strategies to promote low-risk drinking among those who choose to

  17. A survey of psychiatrists' attitudes toward treatment guidelines.

    Science.gov (United States)

    Healy, Daniel J; Goldman, Mona; Florence, Timothy; Milner, Karen K

    2004-04-01

    We developed a survey to look at psychiatrists' attitudes toward psychotropic prescribing guidelines, specifically the Texas Medication Algorithm Project (TMAP) algorithms. The 22-page survey was distributed to 24 psychiatrists working in 4 CMHC's; 13 completed the survey. 90% agreed that guidelines should be general and flexible. The majority also agreed that guidelines should define how to measure response to a specific agent; fewer agreed guidelines should specify dosage, side effect management, or augmentation strategies. Psychiatrists were familiar with TMAP; none referred to it in their practice. In spite of this, psychiatrists' medication preferences were similar to those suggested by guidelines.

  18. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  19. Hands-On Educational Programs and Projects at SICSA

    Science.gov (United States)

    Bell, L.

    2002-01-01

    The Sasakawa International Center for Space Architecture (SICSA) has a long history of projects that involve the design of space structures, including habitats for low-Earth orbit (LEO) and planetary applications. Some of these projects are supported by corporate sponsors, such as a space tourism research, planning and design study conducted for the owner of national U.S. hotel chain. Some have been undertaken in support of programs sponsored by the State Government of Texas, including current commercial spaceport development planning for the Texas Aerospace Commission and three counties that represent candidate spaceport sites. Other projects have been supported by NASA and the Texas Aerospace Consortium, including the design and development of SICSA's "Space Habitation Laboratory", a space station module sized environmental simulator facility which has been featured in the "NASA Select" television broadcast series. This presentation will highlight representative projects. SICSA is internationally recognized for its leadership in the field of space architecture. Many program graduates have embarked upon productive and rewarding careers with aerospace organizations throughout the world. NASA has awarded certificates of appreciation to SICSA for significant achievements contributing to its advanced design initiatives. SICSA and its work have been featured in numerous popular magazines, professional publications, and public media broadcasts in many countries. SICSA applies a very comprehensive scope of activities to the practice of space architecture. Important roles include mission planning conceptualization of orbital and planetary structures and assembly processes, and design of habitats to optimize human safety, adaptation and productivity. SICSA sponsors educational programs for upper division undergraduate students and graduate students with interests in space and experimental architecture. Many fourth year participants continue in the SICSA program throughout

  20. Global Imaging referral guidelines

    International Nuclear Information System (INIS)

    Kawooya, M.; Perez, M.; Lau, L.; Reeed, M.

    2010-01-01

    The medical imaging specialists called for global referral guidelines which would be made available to referring doctors. These referral guidelines should be:- Applicable in different health care settings, including resource-poor settings; Inclusive in terms of the range of clinical conditions; User-friendly and accessible (format/media); Acceptable to stakeholders, in particular to the referrers as the main target audience. To conceive evidence-based medicine as an integration of best research evidence with clinical expertise and patient values. The Direct recipients of the Referral Guidelines would be:- Referrers: general practitioners / family doctors; paediatricians; emergency department doctors; other specialists and health workers. Providers (medical imaging practitioners): radiologists; nuclear medicine physicians; radiographers; other appropriately qualified practitioners providing diagnostic imaging services. For the Referral Guidelines to be effective there need to be: Credibility evidence-based Practicality end user involvement Context local resources, disease profiles Endorsement, opinion leaders Implementation- policy, education, CPOE - Monitoring of the use clinical audit, report feedback. The aim of the Referral Guidelines Project was to: Produce global referral guidelines that are evidence-based, cost effective and appropriate for the local setting, and include consideration of available equipment and expertise (RGWG; SIGs); Include supporting information about radiation doses, potential risks, protection of children and pregnant women (introductory chapter); Facilitate the implementation of the guidelines through guidance and tools (e.g. implementation guides, checklists, capacity building tools, guides on stakeholders engagement, audit support criteria); Conduct pilot testing in different clinical settings from each of the six WHO regions; Promote the inclusion of the referral guidelines in the curricula of medical schools; Develop and implement

  1. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hall, L.R.

    1995-05-30

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

  2. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    International Nuclear Information System (INIS)

    Hall, L.R.

    1995-01-01

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1

  3. Project H.O.P.E.: Effective University Engagement with Community Afterschool Programs

    Directory of Open Access Journals (Sweden)

    Barbara C. Jentleson

    2009-09-01

    Full Text Available Implemented in 2002 by the Duke-Durham Neighborhood Partnership, Project H.O.P.E. has improved the quantity and quality of afterschool programs for the youth of Durham, NC. Project H.O.P.E. provides tutoring programs, enrichment resources, and evaluation support to non-profit community partner organizations located in the low income Durham neighborhoods surrounding Duke University. Duke University undergraduates who provide tutoring services to the Durham youth in the afterschool programs gain from valuable reciprocal service learning experiences. Project H.O.P.E. is an effective model of the mutual benefits that can be gained from effective university and community engagement in the service of at-risk students.

  4. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    Science.gov (United States)

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  5. 25 CFR 163.81 - Assessment guidelines.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Assessment guidelines. 163.81 Section 163.81 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GENERAL FORESTRY REGULATIONS Program Assessment § 163.81 Assessment guidelines. Assessments shall be national in scope and shall include: (a) An...

  6. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  7. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  8. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  9. A manual for implementing residual radioactive material guidelines

    International Nuclear Information System (INIS)

    Gilbert, T.L.; Yu, C.; Yuan, Y.C.; Zielen, A.J.; Jusko, M.J.; Wallo, A. III; Argonne National Lab., IL; Dames and Moore, West Valley, NY; Argonne National Lab., IL; USDOE Assistant Secretary for Nuclear Energy, Washington, DC

    1989-06-01

    This manual presents information for implementing US Department of Energy (DOE) guidelines for residual radioactive material at sites identified by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program (SFMP). It describes the analysis and models used to derive site-specific guidelines for allowable residual concentrations of radionuclides in soil and the design and use of the RESRAD computer code for calculating guideline values. It also describes procedures for implementing DOE policy for reducing residual radioactivity to levels that are as low as reasonably achievable. 36 refs., 16 figs, 22 tabs

  10. Education projects: an opportunity for student fieldwork in global health academic programs.

    Science.gov (United States)

    Fyfe, Molly V

    2012-01-01

    Universities, especially in higher-income countries, increasingly offer programs in global health. These programs provide different types of fieldwork projects, at home and abroad, including: epidemiological research, community health, and clinical electives. I illustrate how and why education projects offer distinct learning opportunities for global health program fieldwork. As University of California students, we partnered in Tanzania with students from Muhimbili University of Health and Allied Science (MUHAS) to assist MUHAS faculty with a curricular project. We attended classes, clinical rounds, and community outreach sessions together, where we observed teaching, materials used, and the learning environment; and interviewed and gathered data from current students, alumni, and health professionals during a nationwide survey. We learned together about education of health professionals and health systems in our respective institutions. On the basis of this experience, I suggest some factors that contribute to the productivity of educational projects as global health fieldwork.

  11. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  12. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  13. Radiological guidelines for application to DOE's Formerly Utilized Sites Remedial Action Program. [FUSRAP sites

    Energy Technology Data Exchange (ETDEWEB)

    1983-03-01

    The US Department of Energy has implemented a program to evaluate and, where necessary, take action to protect the public from contamination at sites that were used in the past to process and/or store radioactive materials for the former US Army Corps of Engineers Manhattan Engineer District or the US Atomic Energy Commission. The program is identified as the Formerly Utilized Sites Remedial Action Program (FUSRAP). This document describes methods considered appropriate for the evaluation of health effects that might possible be caused by radioactive contamination at FUSRAP sites. This assessment methodology is applied to a typical site for the purposeof deriving guidelines for the cleanup of contaminated soil. Additional guidance is provided for planning site-specific remedial action that is consistent with the overall objectives of FUSRAP.

  14. STRATEGIC PROJECT MANAGEMENT PRINCIPLES, PROGRAMS AND PORTFOLIOS OF THE MEDICAL INSTITUTION

    Directory of Open Access Journals (Sweden)

    Елена Борисовна ДАНЧЕНКО

    2017-03-01

    Full Text Available The article gives a brief overview of the latest research in the direction of the use of the project-based approach to the management of medical institutions. It is shown that medicine today is a project-oriented area, and modern scientific studies suggest the use of not only the project management approach and portfolio management. The various scientific sources proposed the classification of projects of medical institutions, mechanisms of formation of projects portfolios of such institutions. The concept of integrated management of medical institutions, which includes strategic, project, portfolio, program management approach (S3P-concept, is offered. According to this concept, the process of S3P-management of the medical institution will include four stages, which are closely interrelated. For the first time, the pair principles of S3P-management are formulated. The proposed concept and principles of S3P-management of medical institution require further development and creating of models, methods and integrated management tools, as well as the development of a system of indicators verify compliance with the organization's strategy of its projects, projects portfolios and programs. This concept and the proposed integrated management principles are universal and can be applied to any project-oriented area.

  15. Development application guidelines : Newfoundland offshore area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-01

    The Canada-Newfoundland Offshore Petroleum Board has created a set of guidelines which describe the information needed by the Board to process a development application by a proponent of an offshore hydrocarbon development project. The guidelines also describe the review process that will be followed in considering a proponent`s application. Proponents must also refer to the Canada-Newfoundland Atlantic Accord Implementation Act and the Canada-Newfoundland Atlantic Accord Implementation (Newfoundland) Act. These guidelines also describe the requirements for the Canada-Newfoundland benefits plan, the environmental impact statement, the socio-economic impact statement, the safety plan, and the environmental protection plan.

  16. Data Management Challenges in a National Scientific Program of 55 Diverse Research Projects

    Science.gov (United States)

    De Bruin, T.

    2016-12-01

    In 2007-2015, the Dutch funding agency NWO funded the National Ocean and Coastal Research Program (in Dutch: ZKO). This program focused on `the scientific analysis of five societal challenges related to a sustainable use of the sea and coastal zones'. These five challenges were safety, economic yield, nature, spatial planning & development and water quality. The ZKO program was `set up to strengthen the cohesion and collaboration within Dutch marine research'. From the start of the program, data management was addressed, to allow data to be shared amongst the, diverse, research projects. The ZKO program was divided in 4 different themes (or regions). The `Carrying Capacity' theme was subdivided into 3 `research lines': Carrying capacity (Wadden Sea) - Policy-relevant Research - Monitoring - Hypothesis-driven Research Oceans North Sea Transnational Wadden Sea Research 56 Projects were funded, ranging from studies on the governance of the Wadden Sea to expeditions studying trace elements in the Atlantic Ocean. One of the first projects to be funded was the data management project. Its objectives were to allow data exchange between projects, to archive all relevant data from all ZKO projects and to make the data and publications publicly available, following the ZKO Data Policy. This project was carried out by the NIOZ Data Management Group. It turned out that the research projects had hardly any interest in sharing data between projects and had good (?) arguments not to share data at all until the end of the projects. A data portal was built, to host and make available all ZKO data and publications. When it came to submitting the data to this portal, most projects obliged willingly, though found it occasionally difficult to find time to do so. However, some projects refused to submit data to an open data portal, despite the rules set up by the funding agency and agreed by all. The take-home message of this presentation is that data sharing is a cultural and

  17. Formalization of Medical Guidelines

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Šebesta, K.; Tomečková, Marie; Veselý, Arnošt; Zvára, K.; Zvárová, Jana

    2005-01-01

    Roč. 1, - (2005), s. 133-141 ISSN 1801-5603 R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : GLIF model * formalization of guidelines * prevention of cardiovascular diseases Subject RIV: IN - Informatics, Computer Science

  18. Grande Ronde Model Watershed Program Administration and Habitat Projects, Annual Progress Report, Project Period: Program Administration: January 1, 1997 - December 31, 1997 Habitat Projects: January 1, 1997 - March 31, 1998.

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, Cecilia; Kuchenbecker, Lyle; Perry, Patty

    1998-10-28

    This agreement provided funding for operation and administration of the Grande Ronde Model Watershed Program including staffing of an Executive Director, Program Planner, and clerical personnel. The contract covers maintaining program services, project planning, subwatershed plans (CRMP's), public involvement and education, interagency coordination/clearing house, monitoring, and technical support activities that have taken place in the Grande Ronde basin. Cost-share has been received from the Bureau of Reclamation and the Governor's Watershed Enhancement Board.

  19. 40 CFR 60.35c - Reporting and recordkeeping guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Reporting and recordkeeping guidelines... PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills § 60.35c Reporting and recordkeeping guidelines. For approval...

  20. 40 CFR 60.38e - Reporting and recordkeeping guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Reporting and recordkeeping guidelines... PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators § 60.38e Reporting and recordkeeping guidelines...

  1. FDH radiological design review guidelines

    International Nuclear Information System (INIS)

    Millsap, W.J.

    1998-01-01

    These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information

  2. FDH radiological design review guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Millsap, W.J.

    1998-09-29

    These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information.

  3. Assurance management program for the 30 Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  4. Renewable energy water supply - Mexico program summary

    Energy Technology Data Exchange (ETDEWEB)

    Foster, R. [New Mexico State Univ., Las Cruces, NM (United States)

    1997-12-01

    This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importance of training. It also presents much collected data as to the characteristics and performance of the installed systems.

  5. The Perinatal Guidelines Evaluation Project HIV and Pregnancy Study: overview and cohort description.

    Science.gov (United States)

    Ethier, Kathleen A.; Ickovics, Jeannette R.; Fernandez, M. Isabel; Wilson, Tracey E.; Royce, Rachel A.; Koenig, Linda J.

    2002-01-01

    OBJECTIVE: The HIV and Pregnancy Study of the Perinatal Guidelines Evaluation Project is a prospective, longitudinal, multisite study established to: (a) assess the implementation of Public Health Service guidelines regarding the prevention of perinatal HIV transmission and (b) evaluate the psychosocial consequences of HIV infection among pregnant women. A distinctive aspect of the study is the use of an HIV-negative comparison group. This article describes the methodology of the study and baseline characteristics of the study sample. Methods and Results. HIV-infected (n = 336) and uninfected (n = 298) pregnant women were enrolled from four geographic areas: Connecticut, North Carolina, Brooklyn, NY, and Miami, FL. The study included three structured face-to-face interviews from late pregnancy to six months postpartum for HIV-infected and uninfected women. Additional self-reports of medication adherence were collected for the HIV-infected participants, and the medical records of infected mothers and their infants were reviewed. Electronic monitoring of medication adherence was conducted for a subset of the infected women. The groups were successfully matched on self-reported characteristics, including HIV-risk behaviors. More than half of the uninfected women reported a high-risk sexual partner. Baseline comparisons indicated that both the HIV-infected and uninfected women had high levels of depressive symptoms, stress, and recent negative life events. CONCLUSIONS: This study provides a unique description of the psychosocial and behavioral characteristics of a population of low-income women. The results of this study suggest that HIV infection is one of many stressors faced by the women in this study. PMID:12356998

  6. An Application Example Analysis of Quality Assurance Program for STELLA(Sodium Integral Effect Test Loop for Safety Simulation and Assessment) Project

    International Nuclear Information System (INIS)

    Jung, Minhwan; Gam, Dayoung; Eoh, Jae-Hyuk; Jeong, Ji-Young

    2015-01-01

    KAERI has been conducting various basic R and D activities in the field of nuclear technology. In addition, KAERI is now participating in the Generation IV International Forum (GIF), preparing for the development of key technologies for Generation IV nuclear energy system, including Sodium cooled Fast Reactor (SFR) development. All of the key technologies for SFR development need an appropriate level of QA activities to achieve the GIF safety and performance objectives. Therefore, QA activities have been conducted as an essential part of the national SFR project. As a result, QAM (Quality Assurance Manual) and QAP (Quality Assurance Procedures) have been developed for the SFR project, which are based on ASME NQA-1, KEPIC QAP and the GIF Quality Management System Guidelines. In this work, the introduction background and application examples of the QA program for the STELLA project were investigated. Application of the QA for the STELLA project has great significance because the QA has been mainly applied for the nuclear power plant area in operation, which helps ensure the reliability of the test data and completeness of the research performance. Nevertheless, developing more appropriate QA procedures remains a major task because some parts of them are not applicable to the Na-experiment

  7. An Application Example Analysis of Quality Assurance Program for STELLA(Sodium Integral Effect Test Loop for Safety Simulation and Assessment) Project

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Minhwan; Gam, Dayoung; Eoh, Jae-Hyuk; Jeong, Ji-Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    KAERI has been conducting various basic R and D activities in the field of nuclear technology. In addition, KAERI is now participating in the Generation IV International Forum (GIF), preparing for the development of key technologies for Generation IV nuclear energy system, including Sodium cooled Fast Reactor (SFR) development. All of the key technologies for SFR development need an appropriate level of QA activities to achieve the GIF safety and performance objectives. Therefore, QA activities have been conducted as an essential part of the national SFR project. As a result, QAM (Quality Assurance Manual) and QAP (Quality Assurance Procedures) have been developed for the SFR project, which are based on ASME NQA-1, KEPIC QAP and the GIF Quality Management System Guidelines. In this work, the introduction background and application examples of the QA program for the STELLA project were investigated. Application of the QA for the STELLA project has great significance because the QA has been mainly applied for the nuclear power plant area in operation, which helps ensure the reliability of the test data and completeness of the research performance. Nevertheless, developing more appropriate QA procedures remains a major task because some parts of them are not applicable to the Na-experiment.

  8. FEEDING GUIDELINES FOR INFANTS AND TODDLERS (START HEALTHY PROGRAM

    Directory of Open Access Journals (Sweden)

    Nancy Butte

    2007-01-01

    Full Text Available The dietary guidelines for americans contains recommendations on diets and healthy lifestyles but it does not deal with specificities of the diet and feeding breast and small infants (to 2 years. However, parents and carecgivers need practical recommendations on feeding infants and toddlers that are necessary to ensure a normal growth and to create the basis for forming healthy food habits, which apart from other benefits might help prevent the development of obesity and other diseases in both childhood and adulthood. The feeding guidelines for infants and toddlers is aimed at providing parents and carecgivers with practical information on feeding breast and small infants. It is intendced for adding and broadening recommendations worked out by other expert groups and organizations. The article provides a substantiation of the guidelines. The methodology, results and a complete reference list used to work out the recommendations are presented in another document.Key words: infants, nutrition.

  9. Use of GIS technologies to facilitate the transportation project programming process.

    Science.gov (United States)

    2008-05-01

    Transportation project programming in a transportation agency is a process of matching : potential projects with available funds to accomplish the agencys mission and goals of a : given period of time. Result of this process is normally a transpor...

  10. 75 FR 26945 - International Education Programs Service-Fulbright-Hays Group Projects Abroad Program

    Science.gov (United States)

    2010-05-13

    .... Schools and/or departments of education have a role to play in creating greater exposure since they are... DEPARTMENT OF EDUCATION International Education Programs Service--Fulbright-Hays Group Projects... Postsecondary Education, Department of Education. ACTION: Notice of proposed priorities. SUMMARY: The Assistant...

  11. NASA Game Changing Development Program Manufacturing Innovation Project

    Science.gov (United States)

    Tolbert, Carol; Vickers, John

    2011-01-01

    This presentation examines the new NASA Manufacturing Innovation Project. The project is a part of the Game Changing Development Program which is one element of the Space Technology Programs Managed by Office of the Chief Technologist. The project includes innovative technologies in model-based manufacturing, digital additive manufacturing, and other next generation manufacturing tools. The project is also coupled with the larger federal initiatives in this area including the National Digital Engineering and Manufacturing Initiative and the Advanced Manufacturing Partnership. In addition to NASA, other interagency partners include the Department of Defense, Department of Commerce, NIST, Department of Energy, and the National Science Foundation. The development of game-changing manufacturing technologies are critical for NASA s mission of exploration, strengthening America s manufacturing competitiveness, and are highly related to current challenges in defense manufacturing activities. There is strong consensus across industry, academia, and government that the future competitiveness of U.S. industry will be determined, in large part, by a technologically advanced manufacturing sector. This presentation highlights the prospectus of next generation manufacturing technologies to the challenges faced NASA and by the Department of Defense. The project focuses on maturing innovative/high payoff model-based manufacturing technologies that may lead to entirely new approaches for a broad array of future NASA missions and solutions to significant national needs. Digital manufacturing and computer-integrated manufacturing "virtually" guarantee advantages in quality, speed, and cost and offer many long-term benefits across the entire product lifecycle. This paper addresses key enablers and emerging strategies in areas such as: Current government initiatives, Model-based manufacturing, and Additive manufacturing.

  12. The Hemingway Project: A Collaborative School-based Program for Teacher Certification.

    Science.gov (United States)

    Butler, Shannon K.; And Others

    At Weber State University (Utah), teacher educators have collaborated with English faculty to design a pilot program (Hemingway Project) which serves as an initial effort to restructure the teacher education program. The program, funded by the Hemingway Foundation, is intended to provide greater integration of the university experience with actual…

  13. Sector-specific issues and reporting methodologies supporting the General Guidelines for the voluntary reporting of greenhouse gases under Section 1605(b) of the Energy Policy Act of 1992. Volume 2: Part 4, Transportation sector; Part 5, Forestry sector; Part 6, Agricultural sector

    International Nuclear Information System (INIS)

    1994-10-01

    This volume, the second of two such volumes, contains sector-specific guidance in support of the General Guidelines for the voluntary reporting of greenhouse gas emissions and carbon sequestration. This voluntary reporting program was authorized by Congress in Section 1605(b) of the Energy Policy Act of 1992. The General Guidelines, bound separately from this volume, provide the overall rationale for the program, discuss in general how to analyze emissions and emission reduction/carbon sequestration projects, and address programmatic issues such as minimum reporting requirements, time parameters, international projects, confidentiality, and certification. Together, the General Guidelines and the guidance in these supporting documents will provide concepts and approaches needed to prepare the reporting forms. This second volume of sector-specific guidance covers the transportation sector, the forestry sector, and the agricultural sector

  14. European Patient Summary Guideline: Focus on Greece.

    Science.gov (United States)

    Berler, Alexander; Tagaris, Anastassios; Chronaki, Catherine

    2016-01-01

    The European Patient Summary (PS) guideline specifies a minimal dataset of essential and important information for unplanned or emergency care initially defined in the epSOS project with aim to improve patients' safety and quality of Care. The eHealth Network of European Union (EU) Member State (MS) representatives established under Article 14 of the EU directive 2011/24 on patient rights to cross-border healthcare adopted PS guideline in November 2013 and since then the guideline has been part of MS strategic eHealth implementation plans, standardization efforts, and concrete regional, national, European and international projects. This paper reviews implementation efforts for the implementation of an operational patient summary service in Greece drawing on challenges and lessons learned for sustainable standards-based large scale eHealth deployment in Europe and abroad, as well as the reuse of best practices from international standards and integration profiles.

  15. Guidelines for Acceptable Project Expenditures

    International Development Research Centre (IDRC) Digital Library (Canada)

    IDRC CRDI

    You should indicate the total cost for ... achieving project objectives or the quality and effects of IDRC-funded activities. You can include ... travel-management processes to handle travel, but the class of travel and per diems must follow IDRC.

  16. 24 CFR 570.209 - Guidelines for evaluating and selecting economic development projects.

    Science.gov (United States)

    2010-04-01

    ..., where the recreational benefit to users or members clearly outweighs employment or other benefits to low... DEVELOPMENT BLOCK GRANTS Eligible Activities § 570.209 Guidelines for evaluating and selecting economic... activities to be carried out for economic development purposes. Specifically, these guidelines are applicable...

  17. Michigan Oncology Medical Home Demonstration Project: First-Year Results.

    Science.gov (United States)

    Kuntz, Gordon; Tozer, Jane; Snegosky, Jeff; Fox, John; Neumann, Kurt

    2014-03-01

    The Michigan Oncology Medical Home Demonstration Project (MOMHDP) is an innovative multipractice oncology medical home model, supported by payment reform. Sponsored by Priority Health, Physician Resource Management, and ION Solutions, MOMHDP includes four oncology practices and 29 physicians. Oncology practices used existing technologies, with MOMHDP providing evidence-based treatment guideline selection and compliance tracking, automated physician order entry, a patient portal, symptom management/standardized nurse triage, and advance care planning. To support changes in care and administrative models and to focus on quality, MOMHDP modifies provider payments. The program replaces the average sales price payment methodology with a drug acquisition reimbursement plus a care management fee, calculated to increase total drug reimbursement. Additionally, it reimburses for chemotherapy and treatment planning and advance care planning consultation. There is also a shared savings opportunity. MOMHDP will be enhanced in its second year to include a survivorship program, patient distress screening, imaging guidelines, and standardized patient satisfaction surveys. Priority Health patients receiving chemotherapy for a cancer diagnosis were recruited to the program. Results for this group were compared with a control group of patients from a prior period. In addition to the financial results, the project also accomplished the following: (1) adherence to practice-selected guidelines, (2) institution of advance care planning, (3) effective and standardized symptom management; and (4) payment reform. We have identified a number of critical success factors: strong payer/provider collaboration built on trust through transparent use and cost data; timing of clinical standardization must come from the practices, so they can effectively absorb new approaches; having comprehensive, written program documentation and consistently applied training facilitate practice understanding

  18. Suggested Curriculum Guidelines for an Effective Bilingual Program. 1972-1973. Destrezas Comunicativas del Idioma Espanol. Spanish Language Skills. Second Grade, Level 2.

    Science.gov (United States)

    Artesia Public Schools, NM.

    This volume contains suggested curriculum guidelines for an effective bilingual program, with specific focus on Spanish language skills for the second grade level. The philosophy of the program views bilingual education as a vehicle and pedagogical tool to be used to better prepare all children to function in society. The point of departure for…

  19. Suggested Curriculum Guidelines for an Effective Bilingual Program, 1972-1973. Destrezas Comunicativas del Idioma Espanol. Spanish Language Skills. Third Grade, Level 3.

    Science.gov (United States)

    Artesia Public Schools, NM.

    This volume contains suggested curriculum guidelines for an effective bilingual program, with specific focus on Spanish language skills for the third grade level. The philosophy of the program views bilingual education as a vehicle and pedagogical tool to be used to better prepare all children to function in society. The point of departure for…

  20. Quality assurance program plan for the radiological survey activities program: Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-08-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  1. Quality assurance program plan for the Radiological Survey Activities Program - Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-01-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  2. Electronic Form of the 1999 WHO/ISH Hypertension Guidelines

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana

    21 Suppl. 4, - (2003), s. 181 ISSN 0263-6352. [European Meeting on Hypertension /13./. 13.06.2003-17.06.2003, Milan] R&D Projects: GA MŠk LN00B107 Keywords : hypertension * WHO/ISH guidelines * electronic guidelines Subject RIV: BA - General Mathematics

  3. 40 CFR 80.127 - Sample size guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Sample size guidelines. 80.127 Section 80.127 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Attest Engagements § 80.127 Sample size guidelines. In performing the...

  4. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  5. Standard operating procedures for ESPEN guidelines and consensus papers.

    Science.gov (United States)

    Bischoff, Stephan C; Singer, Pierre; Koller, Michael; Barazzoni, Rocco; Cederholm, Tommy; van Gossum, André

    2015-12-01

    The ESPEN Guideline standard operating procedures (SOP) is based on the methodology provided by the Association of Scientific Medical Societies of Germany (AWMF), the Scottish Intercollegiate Guidelines Network (SIGN), and the Centre for Evidence-based Medicine at the University of Oxford. The SOP is valid and obligatory for all future ESPEN-sponsored guideline projects aiming to generate high-quality guidelines on a regular basis. The SOP aims to facilitate the preparation of guideline projects, to streamline the consensus process, to ensure quality and transparency, and to facilitate the dissemination and publication of ESPEN guidelines. To achieve this goal, the ESPEN Guidelines Editorial board (GEB) has been established headed by two chairmen. The GEB will support and supervise the guideline processes and is responsible for the strategic planning of ESPEN guideline activities. Key elements of the SOP are the generation of well-built clinical questions according to the PICO system, a systemic literature search, a classification of the selected literature according to the SIGN evidence levels providing an evidence table, and a clear and straight-forward consensus procedure consisting of online voting's and a consensus conference. Only experts who meet the obligation to disclosure any potential conflict of interests and who are not employed by the Industry can participate in the guideline process. All recommendations will be graded according to the SIGN grading and novel outcome models besides biomedical endpoints. This approach will further extent the leadership of ESPEN in creating up-to-date and suitable for implementation guidelines and in sharing knowledge on malnutrition and clinical nutrition. Copyright © 2015 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  6. Alcohol consumption and low-risk drinking guidelines among adults: a cross-sectional analysis from Alberta’s Tomorrow Project

    Science.gov (United States)

    Darren R., Brenner; Tiffany R., Haig; Abbey E, Poirier; Alianu, Akawung; Christine M., Friedenreich; Paula J., Robson

    2017-01-01

    Abstract Introduction: Moderate to heavy alcohol consumption is a risk factor for all-cause mortality and cancer incidence. Although cross-sectional data are available through national surveys, data on alcohol consumption in Alberta from a large prospective cohort were not previously available. The goal of these analyses was to characterize the levels of alcohol consumption among adults from the Alberta’s Tomorrow Project in the context of cancer prevention guidelines. Furthermore, we conducted analyses to examine the relationships between alcohol consumption and other high-risk or risk-related behaviours. Methods: Between 2001 and 2009, 31 072 men and women aged 35 to 69 years were enrolled into Alberta’s Tomorrow Project, a large provincial cohort study. Data concerning alcohol consumption in the past 12 months were obtained from 26 842 participants who completed self-administered health and lifestyle questionnaires. We conducted cross-sectional analyses on daily alcohol consumption and cancer prevention guidelines for alcohol use in relation to sociodemographic factors. We also examined the combined prevalence of alcohol consumption and tobacco use, obesity and comorbidities. Results: Approximately 14% of men and 12% of women reported alcohol consumption exceeding recommendations for cancer prevention. Higher alcohol consumption was reported in younger age groups, urban dwellers, those with higher incomes and those who consumed more red meat. Moreover, volume of daily alcohol consumption was positively associated with current tobacco use in both men and women. Overall, men were more likely to fall in the moderate and high-risk behavioural profiles and show higher daily alcohol consumption patterns compared to women. Conclusion: Despite public health messages concerning the adverse impact of alcohol consumption, a sizeable proportion of Alberta’s Tomorrow Project participants consumed alcohol in excess of cancer prevention recommendations. Continued

  7. Uranium Mill Tailings Remedial Action Project Vicinity Property Program

    International Nuclear Information System (INIS)

    Little, L.E.; Potter, R.F.; Arpke, P.W.

    1988-01-01

    The Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Grand Junction Project Vicinity Property Program is a $165 million program for the removal and disposal of uranium mill tailings that were used in the construction of approximately 4,000 residences, commercial buildings, and institutional facilities in the City of Grand Junction and surrounding Mesa County, Colorado. This paper discusses the UMTRA Vicinity Property Program and the economic benefits of this program for the City of Grand Junction and Mesa County, Colorado. The Bureau of Reclamation Economic Assessment Model (BREAM) was used to estimate the increases in employment and increases in personal income in Mesa County that result from the Vicinity Property Program. The effects of program-related changes in income and taxable expenditures on local and state tax revenue are also presented

  8. Multidisciplinary projects at the Eindhoven/Maastricht BME program

    NARCIS (Netherlands)

    Sauren, A.A.H.J.; Lammerts, I.M.M.; Clark, J.W.

    2002-01-01

    Integration and application of technical and (bio)medical knowledge in the complex area of biomedical engineering is a matter of teamwork. In our educational BME program special attention is focussed on this issue, by means of multidisciplinary projects (MDP's) for 3rd and 4th year students. The

  9. Dietary Guidelines for the Asia Pacific Region.

    Science.gov (United States)

    Binns, Colin W; Lee, Mi Kyung; Kagawa, Masaharu; Low, Wah Yun; Liqian, Qiu; Guldan, Georgia S; Hokama, Tomiko; Nanishi, Keiko; Oy, Sreymom; Tang, Li; Zerfas, Alfred

    2017-03-01

    Nutrition is a major determinant of health throughout all stages of life and together with smoking is the most important risk factor for morbidity and mortality in the Asia Pacific Region. The workshop participants examined Dietary Guidelines and Food Guides that are in use in our region, together with additional materials from the World Health Organization, UNICEF and the World Cancer Research Foundation. The resulting set of guidelines is meant as a reminder of the main issues to be covered in a general public health education program. It may also be of value in reminding public health practitioners, educators, administrators, and policy makers of current nutrition issues. It may additionally be useful as a checklist of the issues to be considered in public health programs and regulations. The main areas of nutrition that are included in the Guidelines are eating a variety of foods, including vegetables, fruits, whole grain cereals, and nuts. Choose fish, poultry, and meats grown in a sustainable way. Appropriate growth, including avoiding obesity, and physical activity are important. Breastfeeding is the basis of infant nutrition and nutrition of mothers is an important public health measure. Negative factors in the Asian diet include salt, refined sugar, alcohol and fats. The APACPH Dietary Guidelines will need to be kept under review and modified to meet regional differences in food supply. The Guidelines will be useful as a checklist of the issues to be considered in public health programs, addressing both acute and chronic diseases.

  10. Proportion of infants meeting the Australian 24-hour Movement Guidelines for the Early Years: data from the Melbourne InFANT Program.

    Science.gov (United States)

    Hesketh, Kylie D; Downing, Katherine L; Campbell, Karen; Crawford, David; Salmon, Jo; Hnatiuk, Jill A

    2017-11-20

    Little information is available on the movement behaviours of infants, despite evidence that these are important for development. The release of new Australian 24-hour Movement Guidelines provides an opportunity to document the current state of movement behaviours in infants relative to these guidelines. The aim of this study was to report the prevalence of 4 month old Australian infants meeting the 24-hour Movement Guidelines, individually, and in combination, and to describe associations with individual characteristics. Maternal report baseline data from the Melbourne Infant Feeding, Activity and Nutrition Trial Program were used to determine prevalence of infants meeting physical activity (30 min of tummy time per day), sedentary behaviour (no more than 1 h at a time kept restrained; zero screen time), and sleep guidelines (14-17 h for 0-3 month olds or 12-16 h for 4-11 month olds). Prevalence of infants meeting combined guidelines was also described. The odds of meeting guidelines based on infant and family characteristics was determined. Data are reported for 455 infants with a mean age of 3.6 months (SD = 1.0). The proportion of infants meeting each of the guidelines was 29.7% for tummy time, 56.9% for kept restrained, 27.9% for screen time, 58.7% for sleep and 3.5% for the combined guidelines (i.e. meeting all four guidelines). A significantly higher proportion of girls than boys met the screen time guideline (32.5% versus 24.0%, p = 0.04) and the combined guidelines (5.7% versus 1.6%, p = 0.01). Few associations were observed between infant and family characteristics and proportion of infants meeting individual guidelines. Very few infants met all of the guidelines contained in the new Australian 24-hour Movement Guidelines suggesting there is much room for improvement in movement behaviours from early life. Fewer infants met the tummy time and screen time guidelines hence these appear to be the behaviours requiring most attention. Parents and

  11. An economic analysis methodology for project evaluation and programming.

    Science.gov (United States)

    2013-08-01

    Economic analysis is a critical component of a comprehensive project or program evaluation methodology that considers all key : quantitative and qualitative impacts of highway investments. It allows highway agencies to identify, quantify, and value t...

  12. Closed cooling water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Breckenridge, Richard

    2014-01-01

    This second revision of the Closed Cooling Water Chemistry Guideline addresses the use of chemicals and monitoring methods to mitigate corrosion, fouling, and microbiological growth in the closed cooling-water (CCW) systems of nuclear and fossil-fueled power plants. This revision has been endorsed by the utility chemistry community and represents another step in developing a more proactive chemistry program to limit or control closed cooling system degradation with increased consideration of corporate resources and plant-specific design and operating concerns. These guidelines were developed using laboratory data, operating experience, and input from organizations and utilities within and outside of the United States of America. It is the intent of the Revision Committee that these guidelines are applicable to all nuclear and fossil-fueled generating stations around the world. A committee of industry experts—including utility specialists, Institute of Nuclear Power Operations representatives, water-treatment service-company representatives, consultants, a primary contractor, and EPRI staff—collaborated in reviewing available data on closed cooling-water system corrosion and microbiological issues. Recognizing that each plant owner has a unique set of design, operating, and corporate concerns, the Guidelines Committee developed a methodology for plant-specific optimization. The guideline provides the technical basis for a reasonable but conservative set of chemical treatment and monitoring programs. The use of operating ranges for the various treatment chemicals discussed in this guideline will allow a power plant to limit corrosion, fouling, and microbiological growth in CCW systems to acceptable levels. The guideline now includes closed cooling chemistry regimes proven successful in use in the international community. The guideline provides chemistry constraints for the use of phosphates control, as well as pure water with pH control. (author)

  13. Guidelines in electrodiagnostic medicine. American Association of Electrodiagnostic Medicine.

    Science.gov (United States)

    1992-02-01

    The American Association of Electrodiagnostic Medicine (AAEM) is committed to the development of sound and clinically relevant guidelines through review of literature, expert opinion and consensus. In 1979, with the assistance of its Professional Practice Committee and association leaders, the association published its initial guidelines, Guidelines in Electrodiagnostic Medicine, covering the practice of electrodiagnostic medicine. The committee is charged with ongoing revision of the document, as needed, and the current version includes standards of practice in clinical electromyography, risks in electrodiagnostic medicine, basic equipment requirements, and the role of paramedical support. In 1988, Educational Guidelines for Electrodiagnostic Training Programs (Appendix A) was prepared by the AAEM Training Program Committee and added to aid training program directors in establishing new training programs or in reviewing the current status of the educational aspects of existing programs. In 1986, the AAEM charged its Quality Assurance Committee with the responsibility for the development of guidelines pertinent to electrodiagnostic medical consultations. The impetus for the charge was the requests received from members of the AAEM and other interested parties for educational material on indications for and conduct of electrodiagnostic medical consultations. As a result of the committee's efforts, Suggested Guidelines for Electrodiagnostic Medical Consultations (Appendix D), was published in 1989 and additional sections added subsequently. The current document includes (1) general indications for an electrodiagnostic medical consultation for patients with suspected myopathies, neuromuscular junction disorders, polyneuropathies, mononeuropathies, plexopathies, radiculopathies, neuronopathies and central nervous system disorders, (2) specific indications for patients with suspected lumbosacral or cervical radiculopathies, (3) general principles of electrodiagnostic

  14. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  15. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  16. European guidelines for workplace drug testing in urine.

    Science.gov (United States)

    Taskinen, Sanna; Beck, Olof; Bosch, Tessa; Brcak, Michaela; Carmichael, Duncan; Fucci, Nadia; George, Claire; Piper, Mark; Salomone, Alberto; Schielen, Wim; Steinmeyer, Stefan; Weinmann, Wolfgang

    2017-06-01

    These European Guidelines for Workplace Drug Testing in Urine have been prepared and updated by the European Workplace Drug Testing Society (EWDTS). The first version of these urine guidelines was published in 2002. Since then, the guidelines have been followed by many laboratories in different European countries and their role has been essential particularly in countries lacking legislation for workplace drug testing. In 2014, the EWDTS started a guidelines updating project and published a new version of the urine guidelines in 2015. Here we represent this updated version of the urine guidelines. The European Guidelines are designed to establish best practice procedures whilst allowing individual countries to operate within the requirements of national customs and legislation. The EWDTS recommends that all European laboratories that undertake legally defensible workplace drug testing should use these guidelines as a template for accreditation. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  17. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  18. 20 CFR 416.250 - Experimental, pilot, and demonstration projects in the SSI program.

    Science.gov (United States)

    2010-04-01

    ... administration of the SSI program. These projects will test the advantages of altering certain requirements... demonstration project will have a termination date (up to 10 years from the start of the project). [48 FR 7576...

  19. Fire protection guidelines for nuclear power plants, June 1976

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    Guidelines acceptable to the NRC staff for implementing in the development of a fire protection program for nuclear power plants. The purpose of the fire protection program is to ensure the capability to shut down the reactor and maintain it in a safe shutdown condition and to minimize radioactive releases to the environment in the event of a fire. If designs or methods different from the guidelines presented herein are used, they must provide fire protection comparable to that recommended in the guidelines. Suitable bases and justification should be provided for alternative approaches to establish acceptable implementation of General Design Criterion 3

  20. Use of Standard Guidelines for Department of Medicine Summary Letters.

    Science.gov (United States)

    Fitz, Matthew; La Rochelle, Jeffrey; Lang, Valerie; DeWaay, Deborah; Adams, William; Nasraty, Farah

    2018-04-12

    Phenomenon: Fourth-year medical students obtain Department of Medicine (DOM) letters ("Chair" letters) to support their residency applications. Writing and interpreting DOM letters are challenging. There is heterogeneity in the letters that makes it difficult to both write and read these letters. The purpose of this study is to determine the value of new guidelines developed by a task force of clerkship directors and program directors in internal medicine and assess the implementation of these guidelines. The Clerkship Directors in Internal Medicine performed a cross-sectional survey of internal medicine clerkship directors at U.S. and Canadian medical schools in 2014. In addition, the primary author's institution reviewed 1,347 DOM letters between 2012 and 2014 to assess the implementation of these guidelines. The survey response rate was 78%. DOM letter writers reported the guidelines were better, easier to implement, and more compatible with the purpose of DOM letters than previously. Most letter readers reported that letters using the guidelines were more credible. Writers of DOM letters in lower academic ranks rated the letters with guidelines higher in several domains than those in higher academic ranks. Readers of DOM letters in higher academic ranks rated the letters with guidelines higher in several domains than those in lower academic ranks. In the DOM letters examined, the odds of meeting each guideline increased with each additional year. However, for 3 guidelines there was an initial decline in adherence from 2012 to 2013 before increasing again in 2014-the recommended length, clerkship description, and detailed narrative guidelines. Letters solely written by a chair were less likely to incorporate the guidelines. Insights: Clerkship directors often write the DOM letters and identify with the purpose of the guidelines. As writers, lower ranking academic faculty value the guidelines more than higher ranking academic faculty. As readers of DOM letters

  1. Hawaii energy strategy project 3: Renewable energy resource assessment and development program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    RLA Consulting (RLA) has been retained by the State of Hawaii Department of Business, Economic Development and Tourism (DBEDT) to conduct a Renewable Energy Resource Assessment and Development Program. This three-phase program is part of the Hawaii Energy Strategy (HES), which is a multi-faceted program intended to produce an integrated energy strategy for the State of Hawaii. The purpose of Phase 1 of the project, Development of a Renewable Energy Resource Assessment Plan, is to better define the most promising potential renewable energy projects and to establish the most suitable locations for project development in the state. In order to accomplish this goal, RLA has identified constraints and requirements for renewable energy projects from six different renewable energy resources: wind, solar, biomass, hydro, wave, and ocean thermal. These criteria were applied to areas with sufficient resource for commercial development and the results of Phase 1 are lists of projects with the most promising development potential for each of the technologies under consideration. Consideration of geothermal energy was added to this investigation under a separate contract with DBEDT. In addition to the project lists, a monitoring plan was developed with recommended locations and a data collection methodology for obtaining additional wind and solar data. This report summarizes the results of Phase 1. 11 figs., 22 tabs.

  2. International service learning programs: ethical issues and recommendations.

    Science.gov (United States)

    Reisch, Rebecca A

    2011-08-01

    Inequities in global health are increasingly of interest to health care providers in developed countries. In response, many academic healthcare programs have begun to offer international service learning programs. Participants in these programs are motivated by ethical principles, but this type of work presents significant ethical challenges, and no formalized ethical guidelines for these activities exist. In this paper the ethical issues presented by international service learning programs are described and recommendations are made for how academic healthcare programs can carry out international service learning programs in a way that minimizes ethical conflicts and maximizes benefits for all stakeholders. Issues related to project sustainability and community involvement are emphasized. © 2011 Blackwell Publishing Ltd.

  3. Managing challenging interactions with family caregivers in the cancer setting: Guidelines for clinicians (TRIO Guidelines-2).

    Science.gov (United States)

    Laidsaar-Powell, Rebekah; Butow, Phyllis; Boyle, Frances; Juraskova, Ilona

    2018-06-01

    Family caregivers can, at times, add complexity to clinical encounters. Difficult family caregivers and dynamics may: derail consultation communication, reduce patient autonomy, and compromise effective clinical care. A paucity of practical strategies guiding effective clinician-family communication exists. This study aimed to develop and evaluate the first comprehensive, evidence-based guidelines (the TRIO guidelines) for oncology physicians and nurses to better manage several complex/challenging situations involving family members. TRIO Guidelines were based on a comprehensive review of literature, relevant guidelines, and feedback from an expert advisory group (n = 10). Draft guidelines underwent two rounds of evaluation via an online Delphi consensus process involving international experts (n = 35). Guidelines incorporate topic areas, strategies, and sub-strategies on managing challenging family involvement (7 topics). Example wording, behaviours and level of evidence are provided. Challenging triadic interactions require skillful navigation, and the TRIO Guidelines provide clear, specific, and evidence-based strategies for clinicians to utilise in these potentially stressful encounters. Training based on these guidelines may improve both patient care and clinician confidence. Implementation of these guidelines into medical/nursing curricula and as a component of continuing professional development programs will likely be highly beneficial. Copyright © 2018 Elsevier B.V. All rights reserved.

  4. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  5. Sandia software guidelines: Software quality planning

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  6. Implementing shared decision making in federally qualified health centers, a quasi-experimental design study: the Office-Guidelines Applied to Practice (Office-GAP) program

    OpenAIRE

    Olomu, Adesuwa; Hart-Davidson, William; Luo, Zhehui; Kelly-Blake, Karen; Holmes-Rovner, Margaret

    2016-01-01

    Background Use of Shared Decision-Making (SDM) and Decision Aids (DAs) has been encouraged but is not regularly implemented in primary care. The Office-Guidelines Applied to Practice (Office-GAP) intervention is an application of a previous model revised to address guidelines based care for low-income populations with diabetes and coronary heart disease (CHD). Objective: To evaluate Office-GAP Program feasibility and preliminary efficacy on medication use, patient satisfaction with physician ...

  7. Translating sickle cell guidelines into practice for primary care providers with Project ECHO

    Directory of Open Access Journals (Sweden)

    Lisa M. Shook

    2016-11-01

    Full Text Available Background: Approximately 100,000 persons with sickle cell disease (SCD live in the United States, including 15,000 in the Midwest. Unfortunately, many patients experience poor health outcomes due to limited access to primary care providers (PCPs who are prepared to deliver evidence-based SCD care. Sickle Treatment and Outcomes Research in the Midwest (STORM is a regional network established to improve care and outcomes for individuals with SCD living in Indiana, Illinois, Michigan, Minnesota, Ohio, and Wisconsin. Methods: STORM investigators hypothesized that Project ECHO® methodology could be replicated to create a low-cost, high-impact intervention to train PCPs in evidence-based care for pediatric and young adult patients with SCD in the Midwest, called STORM TeleECHO. This approach utilizes video technology for monthly telementoring clinics consisting of didactic and case-based presentations focused on the National Heart, Lung and Blood Institute (NHLBI evidence-based guidelines for SCD. Results: Network leads in each of the STORM states assisted with developing the curriculum and are recruiting providers for monthly clinics. To assess STORM TeleECHO feasibility and acceptability, monthly attendance and satisfaction data are collected. Changes in self-reported knowledge, comfort, and practice patterns will be compared with pre-participation, and 6 and 12 months after participation. Conclusions: STORM TeleECHO has the potential to increase implementation of the NHLBI evidence-based guidelines, especially increased use of hydroxyurea, resulting in improvements in the quality of care and outcomes for children and young adults with SCD. This model could be replicated in other pediatric chronic illness conditions to improve PCP knowledge and confidence in delivering evidence-based care.

  8. Kodak Skills Enhancement Program. U.S. Department of Education National Workplace Literacy Project. Final Report.

    Science.gov (United States)

    Beaudin, Bart P.

    The Kodak Skills Enhancement program was a workplace literacy project funded through the U.S. Department of Education's National Workplace Literacy Program. The project goals were as follows: (1) establish a positive climate within the Kodak corporate environment to ensure program effectiveness by garnering support at all levels; (2) determine the…

  9. Formalization of 2007 ESH/ESC Hypertension Guidelines (HGL)

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana; Zvolský, Miroslav

    2008-01-01

    Roč. 26, Suppl. 1 (2008), s. 302-302 ISSN 0952-1178. [ Hypertension 2008. 14.06.2008-19.06.2008, Berlin] R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : formalization of medical guidelines * 2007 ESH/ESC hypertension guidelines Subject RIV: FA - Cardiovascular Diseases incl. Cardiotharic Surgery

  10. Guidelines for identifying suspect/counterfeit material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    These guidelines are intended to assist users of products in identifying: substandard, misrepresented, or fraudulently marked items. The guidelines provide information about such topics as: precautions, inspection and testing, dispositioning identified items, installed inspection and reporting suspect/counterfeit materials. These guidelines apply to users who are developing procurement documents, product acceptance/verification methods, company procedures, work instructions, etc. The intent of these SM guidelines in relation to the Quality Assurance Program Description (QAPD) and implementing company Management Control Procedures is not to substitute or replace existing requirements, as defined in either the QAPD or company implementing instructions (Management Control Procedures). Instead, the guidelines are intended to provide a consolidated source of information addressing the issue of Suspect/Counterfeit materials. These guidelines provide an extensive suspect component listing and suspect indications listing. Users can quickly check their suspect items against the list of manufacturers products (i.e., type, LD. number, and nameplate information) by consulting either of these listings.

  11. Update on the National Cholesterol Education Program Adult Treatment Panel III guidelines: getting to goal.

    Science.gov (United States)

    McKenney, James M

    2003-09-01

    Considerable data on the pathophysiology, epidemiology, and treatment of dyslipidemia-induced coronary heart disease (CHD) have accumulated in recent years. These data have been assessed and incorporated into the guidelines of the National Cholesterol Education Program Expert Panel on the Detection, Evaluation, and Treatment of High Blood Cholesterol in Adults (Adult Treatment Panel [ATP] III). A major focus of the new guidelines is the assessment of the near-term (i.e., 10-yr) risk of experiencing a CHD event and matching the intensity of treatment to this risk. Patients with diabetes and those with a greater than 20% 10-year risk of experiencing a CHD event have been elevated to the risk level of CHD equivalent. The ATP III guidelines also modify several lipid and lipoprotein classifications. A low-density lipoprotein cholesterol (LDL) level below 100 mg/dl is now considered optimum for all individuals. In addition, high-density lipoprotein cholesterol (HDL) and triglyceride cutoff points have been modified to reflect more accurately the risk associated with abnormalities in these lipoproteins. As with the previous guidelines, the primary target of therapy remains LDL. Therapeutic lifestyle changes consisting of diet, weight reduction, and increased physical activity should be included in all treatment regimens. Based on their potent LDL-lowering properties and their proven ability to decrease mortality in a variety of patient populations, statins are generally the first choice for pharmacologic therapy. A secondary target of therapy includes non-HDL goals for patients with high triglyceride levels and the metabolic syndrome, which is characterized by abdominal obesity, elevated triglyceride levels, low HDL levels, and insulin resistance. Management of these secondary targets includes weight reduction and increased physical activity, and treatment of the lipid and nonlipid risk factors. Overall, ATP III represents an aggressive approach to treating dyslipidemia

  12. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  13. EAACI Guidelines on Allergen Immunotherapy

    DEFF Research Database (Denmark)

    Muraro, A; Roberts, G; Halken, S

    2018-01-01

    conflicting outcomes. This has resulted in confusion about the benefits and risks of AIT amongst policymakers and professionals, as well as in the variable availability of AIT products, regulation and reimbursement policies globally. In 2015 EAACI initiated the AIT Guidelines project as part...

  14. One-year effects of Project EX: A smoking intervention pilot program with Spanish adolescents.

    Science.gov (United States)

    Espada, José P; Gonzálvez, María T; Orgilés, Mireia; Sussman, Steve

    2017-07-01

    Adolescent smoking is a major public health problem, which has led to the development of cessation programs such as Project EX. However, there is no evidence for the long-term efficacy of cessation among Spanish adolescents. This study provides a 1-year follow-up evaluation of the Project EX tobacco use cessation program among 211 smokers. The intent-to-treat 30-day smoking quit rate for the program group was 7.81 percent ( p = .04), whereas no smokers quit in the control group ( p = .02). The intervention had a significant influence on future smoking expectation, intention, motivation to quit, and overall level of 30-day smoking. Long-term outcomes of the Project EX clinic-based program are promising for adolescent smokers in Spain.

  15. A proposal to prove compliance of ESD with EU-guidelines

    International Nuclear Information System (INIS)

    Tschurlovits, M.

    2001-01-01

    The question of compliance with the diagnostic reference levels issued as European Guidelines is discussed based upon measurements of entrance surface dose in four selected projections. The projections were chosen either for the higher dose associated with the investigation or the high frequency of the investigation. The results for the high dose projections lumbar spine and iv pyelography were found to be well below the guidelines. The results for the low dose projections chest pa and chest lat show a mean at about the guidance level. The parameters of the measurements are shown and possible reasons for the scattering of data are discussed. The parameters of the measurements are compared with the proposal of the EU. The main conclusion was a) that even when not all parameters are consistent with EU-guides, the dose is frequently much lower than required. In addition, the ranking in ESD was different for different techniques and different radiologists. Because an approved method to indicate compliance is not yet available, a proposal is given in order to make the guidelines executable. (author)

  16. A guideline for green economy implementation in the agriculture sector

    CSIR Research Space (South Africa)

    Musvoto, Constansia D

    2017-08-01

    Full Text Available The CSIR has developed a guideline for implementing green economy projects in the agriculture sector. The guideline is available for use by agricultural practitioners; and is a tool for translating the principles of a green economy into tangible...

  17. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  18. Secret Message Decryption: Group Consulting Projects Using Matrices and Linear Programming

    Science.gov (United States)

    Gurski, Katharine F.

    2009-01-01

    We describe two short group projects for finite mathematics students that incorporate matrices and linear programming into fictional consulting requests presented as a letter to the students. The students are required to use mathematics to decrypt secret messages in one project involving matrix multiplication and inversion. The second project…

  19. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  20. Guidelines for competency development and measurement in rehabilitation psychology postdoctoral training.

    Science.gov (United States)

    Stiers, William; Barisa, Mark; Stucky, Kirk; Pawlowski, Carey; Van Tubbergen, Marie; Turner, Aaron P; Hibbard, Mary; Caplan, Bruce

    2015-05-01

    This study describes the results of a multidisciplinary conference (the Baltimore Conference) that met to develop consensus guidelines for competency specification and measurement in postdoctoral training in rehabilitation psychology. Forty-six conference participants were chosen to include representatives of rehabilitation psychology training and practice communities, representatives of psychology accreditation and certification bodies, persons involved in medical education practice and research, and consumers of training programs (students). Consensus education and training guidelines were developed that specify the key competencies in rehabilitation psychology postdoctoral training, and structured observation checklists were developed for their measurement. This study continues the development of more than 50 years of thinking about education and training in rehabilitation psychology and builds on the existing work to further advance the development of guidelines in this area. The conference developed aspirational guidelines for competency specification and measurement in rehabilitation psychology postdoctoral training (i.e., for studying the outcomes of these training programs). Structured observation of trainee competencies allows examination of actual training outcomes in relation to intended outcomes and provides a methodology for studying how program outcomes are related to program structures and processes so that program improvement can occur. Best practices in applying program evaluation research methods to the study of professional training programs are discussed. (c) 2015 APA, all rights reserved).

  1. Guideline for safe and eco-friendly biomass gasification

    Energy Technology Data Exchange (ETDEWEB)

    Vos, J.; Knoef, H. (BTG biomass technology group, Enschede (Netherlands)); Hauth, M. (Graz Univ. of Technology. Institute of Thermal Engineering, Graz (Austria)) (and others)

    2009-11-15

    The objective of the Gasification Guide project is to accelerate the market penetration of small-scale biomass gasification systems (< 5 MW fuel power) by the development of a Guideline and Software Tool to facilitate risk assessment of HSE aspects. The Guideline may also be applied in retrofitting or converting old thermal plants in the Eastern European countries - with rich biomass recourses - to new gasification plants. The objective of this document is to guide key target groups identifying potential hazards and make a proper risk assessment. The software tool is an additional aid in the risk assessment. This guideline is intended to be a training tool and a resource for workers and employers to safely design, fabricate, construct, operate and maintain small-scale biomass gasification facilities. The Guideline is applicable with the following constraints: 1) The maximum scale of the gasification plant was agreed to be about 1 MW{sub e}. The reason is that large companies do have normally their safety rules in place; 2) This means in principle only fixed bed gasifier designs. However, most parts are also valid to other designs and even other thermal conversion processes; 3) The use of contaminated biomass is beyond the scope of this Guideline. The Guideline contains five major chapters; Chapter 2 briefly describes the gasification technology in general. Chapter 3 gives an overview of major legal framework issues on plant permission and operation. The legal frame is changing and the description is based on the situation by the end of 2007. Chapter 4 explains the theory behind the risk assessment method and risk reduction measures. Chapter 5 is the heart of the Guideline and gives practical examples of good design, operation and maintenance principles. The practical examples and feedback have been received throughout the project and the description is based on mid-2009. Chapter 6 describes the best techniques currently available for emission abatement which are

  2. Workshop presentation: research guidelines for Construction Management

    OpenAIRE

    Marco Alvise Bragadin

    2013-01-01

    Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1) Construction management: tools and methods to manage construction projects 2) environmental impact of construction projects 3) construction management and safety 4) project p...

  3. Summaries of the Idaho National Engineering Laboratory Radioecology and Ecology Program research projects

    International Nuclear Information System (INIS)

    Markham, O.D.

    1987-06-01

    This report provides summaries of individual research projects conducted by the Idaho National Engineering Laboratory Radioecology and Ecology Program. Summaries include projects in various stages, from those that are just beginning, to projects that are in the final publication stage

  4. Analysis to develop a program for energy-integrated farm systems

    Energy Technology Data Exchange (ETDEWEB)

    Eakin, D.E.; Clark, M.A.; Inaba, L.K.; Johnson, K.I.

    1981-09-01

    A program to use renewable energy resources and possibly develop decentralization of energy systems for agriculture is discussed. The purpose of the research presented is to establish the objective of the program and identify guidelines for program development. The program's objective is determined by: (1) an analysis of the technologies that could be utilized to transform renewable farm resources to energy by the year 2000, (2) the quantity of renewable farm resources that are available, and (3) current energy-use patterns. Individual research, development, and demonstration projects are fit into a national program of energy-integrated farm systems on the basis of: (1) market need, (2) conversion potential, (3) technological opportunities, and (4) acceptability. Quantification of these factors for the purpose of establishing program guidelines is conducted using the following four precepts: (1) market need is identified by current use of energy for agricultural production; (2) conversion potential is determined by the availability of renewable resources; and (3) technological opportunities are determined by the state-of-the-art methods, techniques, and processes that can convert renewable resources into farm energy. Each of these factors is analyzed in Chapters 2 to 4. Chapter 5 draws on the analysis of these factors to establish the objective of the program and identify guidelines for the distribution of program funds. Chapter 6 then discusses the acceptability of integrated farm systems, which can not be quantified like the other factors.

  5. A Review Of Nutritional Guidelines And Menu Compositions For School Feeding Programs In 12 Countries.

    Directory of Open Access Journals (Sweden)

    Ruzky eAliyar

    2015-08-01

    Full Text Available Study objectives: To analyze the nutritional guidelines and menu compositions of school meal provision in various different countries.Background: School feeding is the provision of food on-site or to take home, which aims to increase school enrolment, attendance and retention, and exist as a social safety net for households with very low income. Home-grown school feeding (HGSF, additionally, aims to stimulate local economies by providing a source of income for local smallholder farmers. Methods: Literature searches using the Ovid MEDLINE databases, gathered information from in-country stakeholders, and accessed the programme websites of various countries. Nutrient composition of these menus was calculated from nutritional guidelines and menu compositions using a nutrition linear programming tool (NUTVAL.Country comparisons: School feeding aims differ between countries of each income group. The implementation, delivery of service and nutritional content of foods also differ considerably between countries and income groups. In high-income countries, guidelines and standards have been recommended in an attempt to combat rising levels of overweight and obesity, and to model healthier lifestyle habits. In low-income countries there is a gap in terms of guidance on nutrition standards and menu composition.Conclusions: Provision of evidence-based guidance on nutrition standards to middle and low income countries who have recently established or are planning to establish school feeding has the potential to greatly enhance and improve the quality of service and improve the life of millions of children worldwide.

  6. Human factors guidelines for large-screen displays

    International Nuclear Information System (INIS)

    Collier, Steve

    2005-09-01

    Any control-room project (including upgrades or evolutionary improvements to existing control-rooms) is well advised at the outset first to gather and update related background material for the design. This information-gathering exercise should also take into account experience from similar projects and operating experience. For these reasons, we decided to use our research, and experience in large-screen display design with several clients to update human factors guidance for large-screen displays, to take into account new ergonomics guidelines, operating experience, and work from similar projects. To write the updated guidelines, we drew on much of our experience across several departments at IFE, including research funded by the HRP programme, and experience with individual clients. Guidance here is accordingly focused mainly on recent areas of technical and human innovations in the man-machine interface. One particular area of focus was on the increasing use of large-screen display systems in modern control-rooms, and on how guidelines could be adapted and supplemented for their design. Guidance or reference to recommended sources is also given for control suite arrangement and layout, control-room layout, workstation layout, design of displays and controls, and design of the work environment, especially insofar as these ergonomic issues interact with the effectiveness of modern displays, in particular large screen displays. The work shows that there can be synergy between HRP research and bilateral activities: the one side offers a capability to develop tools and guidelines, while the other side gives an opportunity to test and refine these in practice, to the benefit of both parties. (Author)

  7. Human factors guidelines for large-screen displays

    Energy Technology Data Exchange (ETDEWEB)

    Collier, Steve

    2005-09-15

    Any control-room project (including upgrades or evolutionary improvements to existing control-rooms) is well advised at the outset first to gather and update related background material for the design. This information-gathering exercise should also take into account experience from similar projects and operating experience. For these reasons, we decided to use our research, and experience in large-screen display design with several clients to update human factors guidance for large-screen displays, to take into account new ergonomics guidelines, operating experience, and work from similar projects. To write the updated guidelines, we drew on much of our experience across several departments at IFE, including research funded by the HRP programme, and experience with individual clients. Guidance here is accordingly focused mainly on recent areas of technical and human innovations in the man-machine interface. One particular area of focus was on the increasing use of large-screen display systems in modern control-rooms, and on how guidelines could be adapted and supplemented for their design. Guidance or reference to recommended sources is also given for control suite arrangement and layout, control-room layout, workstation layout, design of displays and controls, and design of the work environment, especially insofar as these ergonomic issues interact with the effectiveness of modern displays, in particular large screen displays. The work shows that there can be synergy between HRP research and bilateral activities: the one side offers a capability to develop tools and guidelines, while the other side gives an opportunity to test and refine these in practice, to the benefit of both parties. (Author)

  8. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  9. Workshop presentation: research guidelines for Construction Management

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1 Construction management: tools and methods to manage construction projects 2 environmental impact of construction projects 3 construction management and safety 4 project procurement 5 construction management for major public works & complex projects

  10. The assurance management program for the Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Inertial Confinement Fusion (ICF) approach is explained in general terms. The laser ICF and magnetic fusion facilities are significantly different in that the laser system is used solely as a highly reliable energy source for performing plasma physics experiments related to fusion target development; by contrast, magnetic fusion facilities are themselves the experiments. The Nova project consists of a 10-beam, 74 cm aperture neodymium-glass laser experimental facility which is being constructed by the Lawrence Livermore National Laboratory (LLNL) for the U.S. Department of Energy. Nova has a total estimated cost of $176M and will become operational in the Fall of 1984. The Nova laser will be used as the high energy driver for studying the regime of ignition for ICF. The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  11. Campus sustainable food projects: critique and engagement.

    Science.gov (United States)

    Barlett, Peggy F

    2011-01-01

    Campus sustainable food projects recently have expanded rapidly. A review of four components - purchasing goals, academic programs, direct marketing, and experiential learning - shows both intent and capacity to contribute to transformational change toward an alternative food system. The published rationales for campus projects and specific purchasing guidelines join curricular and cocurricular activities to evaluate, disseminate, and legitimize environmental, economic, social justice, and health concerns about conventional food. Emerging new metrics of food service practices mark a potential shift from rhetoric to market clout, and experiential learning builds new coalitions and can reshape relations with food and place. Campus projects are relatively new and their resilience is not assured, but leading projects have had regional, state, and national impact. The emergence of sustainability rankings in higher education and contract-based compliance around purchasing goals suggests that if support continues, higher education's leadership can extend to the broader agrifood system.

  12. CDIO Projects in DTU’s Chemical and Biochemical B.Eng. Study Program

    DEFF Research Database (Denmark)

    Clement, Karsten; Harris, Pernille; Agersø, Yvonne

    2011-01-01

    The aim of this paper is to describe how the CDIO standards [1] have influenced the cross-disciplinary projects that are part of the study plan for the Chemical and Biochemical B.Eng. program. Four projects are described: The 1st semester design-build project on cleaning of waste water from a power...... plant, the 2nd semester laboratory project concerning antimicrobial resistant E. coli bacteria in retail meats, the 3rd semester project on unit operations in enzyme production, the 4th semester project on the fermentation and purification part of enzyme production....

  13. Guidelines for dynamic international programs

    International Nuclear Information System (INIS)

    Gold, M.A.

    1993-01-01

    Matters of global concern-deforestation, global warming, biodiversity loss, sustainable development, fuelwood crises, watershed destruction, and large-scale flooding-frequently involve forests and natural resources. In the future, university students will enter a global setting that more than ever depends on a strong knowledge of international issues. USA land-grant universities are attempting to prepare students for this challenge by improving their international programs including forestry. To improve university programs, several factors will need to be addressed and are discussed, with examples, in this article: commitment of the faculty; program specialization; geographic specialization; reward systems for international contributions; international collaboration; recycled dollars within the university; active teaching programs; research; extention and outreach; language training; international faculty; travel grants; twinning relationships with sister institutions; selective in pursuit of international development assistance; and study centers. 6 refs

  14. Communication Management Guidelines for Software Organizations in Pakistan with clients from Afghanistan

    Science.gov (United States)

    Arif Shah, Muhammad; Hashim, Rathiah; Shah, Adil Ali; Farooq Khattak, Umar

    2016-11-01

    Developing software through Global Software Development (GSD) became very common now days in the software industry. Pakistan is one of the countries where projects are taken and designed from different countries including Afghanistan. The purpose of this paper is to identify and provide an analysis on several communication barriers that can have a negative impact on the project and to provide management guidelines for medium size software organizations working in Pakistan with clients from Afghanistan and to overcome these communication barriers and challenges organizations face when coordinating with client. Initially we performed a literature review to identify different communication barriers and to check if there are any standardized communications management guidelines for medium size software houses provided in the past. The second stage of the research paper involves guidelines with vendor's perspective that include interviews and focus group discussions with different stakeholders and employees of software houses with clients from Afghanistan. Based on those interviews and discussions we established communication management guidelines in order to overcome the communication problems and barriers working with clients from Afghanistan. As a result of the literature review, we have identified that barriers such as cultural barriers and language barrier were one of the main reasons behind the project failure and suggested that software organizations working in Pakistan should follow certain defined communication guidelines in order to overcome communication barriers that affect the project directly.

  15. Science and students: Yucca Mountain project's education outreach program

    International Nuclear Information System (INIS)

    Gil, A.V.; Larkin, E.L.; Reilly, B.; Austin, P.

    1992-01-01

    The U.S. Department of Energy (DOE) is very concerned about the lack of understanding of basic science. Increasingly, critical decisions regarding the use of energy, technology, and the environment are being made. A well-educated and science-literate public is vital to the success of these decisions. Science education and school instruction are integral parts of the DOE's public outreach program on the Yucca Mountain Site Characterization Project (YMP). Project staff and scientists speak to elementary, junior high, high school, and university students, accepting all speaking invitations. The objectives of this outreach program include the following: (1) educating Nevada students about the concept of a high-level nuclear waste repository; (2) increasing awareness of energy and environmental issues; (3) helping students understand basic concepts of earth science and geology in relation to siting a potential repository; and (4) giving students information about careers in science and engineering

  16. Fulbright-Hays Seminars Abroad Program 1992: Morocco and Tunisia. Final Projects.

    Science.gov (United States)

    AMIDEAST, Washington, DC.

    The projects described in this document were submitted by U.S. teachers who spent time in Morocco and Tunisia as part of the 1992 Fulbright-Hays Seminars Abroad Program. The following are among the titles of the projects included: "Formal Education in Rural Morocco: Problems and Constraints" (Victoria Baker); "Continuity and Change…

  17. Challenges in Implementing FP7 Projects in the Public Institutions

    Directory of Open Access Journals (Sweden)

    Viorel VULTURESCU

    2012-06-01

    Full Text Available National Authority for Scientific Research (ANCS and Executive Unit for Higher Education, Research and Development and Innovation Funding (UEFISCDI participate to several projects funded under the Framework Programmes, since 1998. The staff from each the two organisations participating in projects are merely the same, typically from “international cooperation” departments. In each of the two organisations, dedicated teams were set and a distinct specialization emerged. In this respect, dedicated procedures and good practices in project management were developed. Even the Framework Programs had different structures and the focused was different (e.g. knowledge creation, EU problem solving, scientific support for policies and programs, etc., the funding instruments (projects were not radically different from a Framework Program to another, so the staff could gain experience in managing this type of projects. Experience and expertise gained during this long period of time led to definition of a general framework within the two institutions and setting up of a general guideline for participation to this type of projects. The main dimensions of this framework are: project team organization, project management process, managing results and risk, organisational framework, good practices, factors which ensure success in project implementation.The paper presents a specific framework for FP 7 project implementation and how this framework is applied by both organisations, a set of rules and procedures that should be followed by any organisation, in particular governmental ones, participating in FP 7 projects and a set of good practices developed by ANCS and UEFISCDI.

  18. Guidelines for a radiology department

    International Nuclear Information System (INIS)

    1981-05-01

    This manual presents guidelines for hospitals on a radiology quality assurance and dose measurement audit program and a system of planned actions that monitor and record the performance and effectiveness of the radiological service

  19. Advanced human-system interface design review guideline. General evaluation model, technical development, and guideline description

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use

  20. Advanced human-system interface design review guideline. General evaluation model, technical development, and guideline description

    Energy Technology Data Exchange (ETDEWEB)

    O`Hara, J.M.

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator`s overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use.

  1. Development of a HFE program for an operating NPP: Balancing between existing design practices and human factors standards

    International Nuclear Information System (INIS)

    Salo, Leena; Savioja, Paula

    2014-01-01

    This paper describes HFE program development project conducted at a Finnish power company Fortum. The aim of developing a formal HFE program was to improve integration of human factors issues in design of technical systems and to systematically document the HFE process of the company. As Fortum has a long tradition of designing control room solutions, the starting point of the HFE program development was the existing own design practices. On the other hand, the aim was to create a program which would comply with international guidelines such as NUREG-0711. The program development was conducted by tracing the HFE design practices in an on-going I and C modernization project. This empirical work was carried out by interviews of designers and other HFE key stake holders. After the explication of the current practices, the gaps, overlaps and differences in relation to the international standards and guidelines were identified. Based on an analysis of current practices and guidelines and standards a new HFE process model was created. The design process model can be followed in modifications which concern systems with human user interfaces of any kind. The model consists of five separate phases which comply with the general engineering design process model utilized at the company. The HFE program is intended to be both a practical guide on how to take human factors issues into consideration in the design of NPP systems and also a tool for the management of HFE activities

  2. Curriculum Guidelines for Periodontics for Dental Hygiene Programs.

    Science.gov (United States)

    Journal of Dental Education, 1986

    1986-01-01

    American Association of Dental Schools guidelines consist of an introduction to the field and its interrelationships with other fields of dental hygiene; an overview of the curriculum; outlines of primary educational goals, prerequisites, and specific content-related and clinical behavioral objectives; and recommendations concerning sequencing,…

  3. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    Energy Technology Data Exchange (ETDEWEB)

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  4. The Yucca Mountain Project Prototype Testing Program

    International Nuclear Information System (INIS)

    1989-10-01

    The Yucca Mountain Project is conducting a Prototype Testing Program to ensure that the Exploratory Shaft Facility (ESF) tests can be completed in the time available and to develop instruments, equipment, and procedures so the ESF tests can collect reliable and representative site characterization data. This report summarizes the prototype tests and their status and location and emphasizes prototype ESF and surface tests, which are required in the early stages of the ESF site characterization tests. 14 figs

  5. Put in value of the Santa Teresa Park as a cultural landscape. Project and Ordinance of the Landscape in the General Guidelines of its Master Plan

    Directory of Open Access Journals (Sweden)

    Nair Rosana Sommaruga Montiel

    2018-03-01

    Full Text Available The paper is a summary of the landscape studies developed in the framework of 'Lineamientos generales para el Plan Director del Parque Santa Teresa' (General guidelines for Santa Teresa Park Master Plan, agreement made between the Ministry of Tourism, and the Faculty of Architecture, Design And Urbanism of the University of the Republic between August 2015 and July 2016. The purpose of the Convention is to position the Santa Teresa Park as a "model park" for Uruguay, putting in value its patrimonial, landscape and Environmental characteristics, thus contributing to its tourism and sociocultural promotion. The entire project includes and combines different disciplinary studies as well as external contributions. The Research program “Landscape and Public Space” from the Institute of Design in collaboration with VIDIALAB develops the Characterization and Landscape Assessment of the Park, through studies and proposals on its landscape structures, sociocultural perceptions and the qualification of the visual landscape.

  6. 34 CFR 379.11 - What additional types of project activities may be authorized under this program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What additional types of project activities may be... EDUCATION PROJECTS WITH INDUSTRY What Kinds of Activities Does the Department of Education Assist Under This Program? § 379.11 What additional types of project activities may be authorized under this program? The...

  7. Determination of Guidelines Complience: Comparison of Clinical Guidelines with the Patient’s Record

    Czech Academy of Sciences Publication Activity Database

    Veselý, A.; Zvárová, Jana

    2012-01-01

    Roč. 8, č. 1 (2012), s. 16-28 ISSN 1801-5603 R&D Projects: GA MŠk(CZ) 1M06014 Institutional support: RVO:67985807 Keywords : clinical guidelines * GLIF model * Electronic Health Record * reminder facility * execution engine algorithm Subject RIV: IN - Informatics, Computer Science http://www.ejbi.org/img/ejbi/2012/1/Vesely_en.pdf

  8. EPRI PWR primary water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Fruzzetti, Keith

    2014-01-01

    EPRI periodically updates the PWR Primary Water Chemistry Guidelines as new information becomes available and as required by NEI 97-06 (Steam Generator Program Guidelines) and NEI 03-08 (Guideline for the Management of Materials Issues). The last revision of the PWR water chemistry guidelines identified an optimum primary water chemistry program based on then-current understanding of research and field information. This new revision provides further details with regard to primary water stress corrosion cracking (PWSCC), fuel integrity, and shutdown dose rates. A committee of industry experts, including utility specialists, nuclear steam supply system (NSSS) and fuel vendor representatives, Institute of Nuclear Power Operations (INPO) representatives, consultants, and EPRI staff collaborated in reviewing the available data on primary water chemistry, reactor water coolant system materials issues, fuel integrity and performance issues, and radiation dose rate issues. From the data, the committee updated the water chemistry guidelines that all PWR nuclear plants should adopt. The committee revised guidance with regard to optimization to reflect industry experience gained since the publication of Revision 6. Among the changes, the technical information regarding the impact of zinc injection on PWSCC initiation and dose rate reduction has been updated to reflect the current level of knowledge within the industry. Similarly, industry experience with elevated lithium concentrations with regard to fuel performance and radiation dose rates has been updated to reflect data collected to date. Recognizing that each nuclear plant owner has a unique set of design, operating, and corporate concerns, the guidelines committee has retained a method for plant-specific optimization. Revision 7 of the Pressurized Water Reactor Primary Water Chemistry Guidelines provides guidance for PWR primary systems of all manufacture and design. The guidelines continue to emphasize plant

  9. Making continental-scale environmental programs relevant locally for educators with Project BudBurst

    Science.gov (United States)

    Goehring, L.; Henderson, S.; Wasser, L.; Newman, S. J.; Ward, D.

    2012-12-01

    Project BudBurst is a national citizen science initiative designed to engage non professionals in observations of phenological (plant life cycle) events that raise awareness of climate change, and create a cadre of informed citizen scientists. Citizen science programs such as Project BudBurst provide excellent opportunities for educators and their students to actively participate in scientific research. Such programs are important not only from an educational perspective, but because they also enable scientists to broaden the geographic and temporal scale of their observations. The goals of Project BudBurst are to 1) increase awareness of phenology as an area of scientific study; 2) increase awareness of the impacts of changing climates on plants at a continental-scale; and 3) increase science literacy by engaging participants in the scientific process. From its 2008 launch, this on-line program has engaged participants of all ages and walks of life in recording the timing of the leafing and flowering of wild and cultivated species found across the continent, and in contemplating the meaning of such data in their local environments. Thus far, thousands of participants from all 50 states have submitted data. This presentation will provide an overview of Project BudBurst educational resources and share lessons learned from educators in implementing the program in formal and informal education settings. Lesson plans and tips from educators will be highlighted. Project BudBurst is co-managed by the National Ecological Observatory Network and the Chicago Botanic Garden.

  10. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  11. Summary results of an assessment of research projects in the Nuclear Medicine Research program

    International Nuclear Information System (INIS)

    1988-01-01

    In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs

  12. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  13. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    International Nuclear Information System (INIS)

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  14. Medicare depreciation; useful life guidelines--HCFA. Proposed rule.

    Science.gov (United States)

    1982-09-30

    We are proposing to amend Medicare regulations to clarify which useful life guidelines providers of health care services may use to determine the useful life of a depreciable asset for Medicare reimbursement purposes. Current regulations state that providers must utilize HHS useful life guidelines or, if none have been published by HHS, the American Hospital Association (AHA) useful life guidelines of 1973 or IRS guidelines. We are proposing to eliminate the reference to IRS guidelines because those previously acceptable for Medicare purposes are outdated and have been made obsolete by the IRS or by statutory change. We would also delete the specific reference to the 1973 AHA guidelines. In addition, we intend this amendment to clarify that certain tax legislation on accelerated depreciation, recently passed by Congress, does not apply to the Medicare program.

  15. 29 CFR 1608.11 - Limitations on the application of these guidelines.

    Science.gov (United States)

    2010-07-01

    ... Guidelines are applicable only with respect to the circumstances described in § 1608.1(d), of this part. They... complained of, these Guidelines are inapplicable. (c) Currency of plan or program. Under section 713(b)(1), persons may rely on the plan or program only during the time when it is current. Currency is related to...

  16. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  17. Guidelines for a Comprehensive Care Program to Ostomized Patients and Families: a Nursing proposal

    Directory of Open Access Journals (Sweden)

    Paula Alvarenga de Figueiredo

    2016-01-01

    Full Text Available Objectives: describe care needs and demands that mark the discursive practices of ostomized clients and family members and discuss guidelines for a comprehensive care program to ostomized clients and their families, organized by macrosociological categories. Method: Creative and Sensitive, involving 17 ostomized subjects and family members at a municipal outpatient clinic. The ethical aspects were complied with. A characterization form was used, as well as Creativity and Sensitivity Dynamics: "speaking map", "body-knowledge" and "calendar". Critical Discourse Analysis was applied. Results: the health needs and care demands of the ostomized patients and their family members, in their multiple dimensions, were constituted in the home and community, outpatient and social context, implying new orientations for nursing care. The unveiling of the data brought elements that constituted guidelines, in a macrosociological approach, to achieve the expanded integrality of nursing care. Conclusion: the ostomized clients are unique in their genre/peculiar from Latin sui generis, calling for strategies that respond to and distinguish their specificities. Elaborating a Public Health Policy that improves and reorganizes the care demands, taking into account these individual biopsychosocial and spiritual aspects, is a possible and irrevocable target in the attempt to achieve better conditions of health and wellbeing.

  18. Nuclear criticality safety training: guidelines for DOE contractors

    International Nuclear Information System (INIS)

    Crowell, M.R.

    1983-09-01

    The DOE Order 5480.1A, Chapter V, Safety of Nuclear Facilities, establishes safety procedures and requirements for DOE nuclear facilities. This guide has been developed as an aid to implementing the Chapter V requirements pertaining to nuclear criticality safety training. The guide outlines relevant conceptual knowledge and demonstrated good practices in job performance. It addresses training program operations requirements in the areas of employee evaluations, employee training records, training program evaluations, and training program records. It also suggests appropriate feedback mechanisms for criticality safety training program improvement. The emphasis is on academic rather than hands-on training. This allows a decoupling of these guidelines from specific facilities. It would be unrealistic to dictate a universal program of training because of the wide variation of operations, levels of experience, and work environments among DOE contractors and facilities. Hence, these guidelines do not address the actual implementation of a nuclear criticality safety training program, but rather they outline the general characteristics that should be included

  19. Sandia software guidelines, Volume 4: Configuration management

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  20. EDF EPR project: operating principles validation and human factor engineering program

    International Nuclear Information System (INIS)

    Lefebvre, B.; Berard, E.; Arpino, J.-M.

    2005-01-01

    This article describes the specificities of the operating principles chosen by EDF for the EPR project as a result of an extensive Human Factor Engineering program successfully implemented in an industrial project context. The design process and its achievements benefit of the EDF experience feedback not only in term of NPP operation - including the fully computerized control room of the N4-serie - but also in term of NPP designer. The elements exposed hereafter correspond to the basic design phase of EPR HMI which has been completed and successfully validated by the end of 2003. The article aims to remind the context of the project which basically consists in designing a modern and efficient HMI taking into account the operating needs while relying on proven and reliable technologies. The Human Factor Engineering program implemented merges these both aspects by : 1) being fully integrated within the project activities and scheduling; 2) efficiently taking into account the users needs as well as the feasibility constraints by relying on a multidisciplinary design team including HF specialists, I and C specialists, Process specialists and experienced operator representatives. The resulting design process makes a wide use of experience feedback and experienced operator knowledge to complete largely the existing standards for providing a fully useable and successful design method in an industrial context. The article underlines the design process highlights that largely contribute to the successful implementation of a Human Factor Engineering program for EPR. (authors)

  1. Financing R&D Projects in Southern Italy: The “Technological Vouchers and Cooperative Research” Program

    Directory of Open Access Journals (Sweden)

    Gianpaolo Iazzolino

    2013-09-01

    Full Text Available The paper deals with the evaluation and financing of research and innovation projects. The paper analyzes and discusses the “Technological Vouchers and Cooperative Research” program in the Calabria Region (Southern Italy, as a program for financing R&D projects in a geographical area far behind in development. Three real cases of R&D projects are described. The program was effective as regards the stimulus to realizing R&D activities by Calabrian SMEs and furthermore in relation to the improvement of cooperation between SMEs, research centers, universities and technological laboratories. The weak points of the program mainly regard the evaluation phase that made it impossible to get a feedback useful for policy and for driving future agenda.

  2. Seismic safety margins research program. Project I SONGS 1 AFWS Project

    International Nuclear Information System (INIS)

    Chuang, T.Y.; Smith, P.D.; Dong, R.G.; Bernreuter, D.L.; Bohn, M.P.; Cummings, G.E.; Wells, J.E.

    1981-01-01

    The seismic qualification requirements of auxiliary feedwater systems (AFWS) of Pressurized Water Reactors (PWR) were developed over a number of years. These are formalized in the publication General Design Criteria (Appendix A to 10CFR50). The full recognition of the system as an engineered safety feature did not occur until publication of the Standard Review Plan (1975). Efforts to determine how to backfit seismic requirements to earlier plants has been undertaken primarily in the Systematic Evaluation Program (SEP) for a limited number of operating reactors. Nuclear Reactor Research (RES) and NRR have requested LLNL to perform a probabilistic study on the AFWS of San Onofre Nuclear Generating Station (SONGS) Unit 1 utilizing the tools developed by the Seismic Safety Margins Research Program (SSMRP). The main objectives of this project are to: identify the weak links of AFWS; compare the failure probabilities of SONGS 1 and Zion 1 AFWS: and compare the seismic responses due to different input spectra and design values

  3. Guideline Knowledge Representation Model (GLIKREM)

    Czech Academy of Sciences Publication Activity Database

    Buchtela, David; Peleška, Jan; Veselý, Arnošt; Zvárová, Jana; Zvolský, Miroslav

    2008-01-01

    Roč. 4, č. 1 (2008), s. 17-23 ISSN 1801-5603 R&D Projects: GA MŠk(CZ) 1M06014 Institutional research plan: CEZ:AV0Z10300504 Keywords : knowledge representation * GLIF model * guidelines Subject RIV: IN - Informatics, Computer Science http://www.ejbi.org/articles/200812/34/1.html

  4. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  5. Advanced human-system interface design review guideline. Evaluation procedures and guidelines for human factors engineering reviews

    Energy Technology Data Exchange (ETDEWEB)

    O`Hara, J.M.; Brown, W.S. [Brookhaven National Lab., Upton, NY (United States); Baker, C.C.; Welch, D.L.; Granda, T.M.; Vingelis, P.J. [Carlow International Inc., Falls Church, VA (United States)

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator`s overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support. NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use.

  6. Advanced human-system interface design review guideline. Evaluation procedures and guidelines for human factors engineering reviews

    International Nuclear Information System (INIS)

    O'Hara, J.M.; Brown, W.S.; Baker, C.C.; Welch, D.L.; Granda, T.M.; Vingelis, P.J.

    1994-07-01

    Advanced control rooms will use advanced human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role in the system, the method of information presentation, and the ways in which operators interact with the system. The U.S. Nuclear Regulatory Commission (NRC) reviews the HSI aspects of control rooms to ensure that they are designed to good human factors engineering principles and that operator performance and reliability are appropriately supported to protect public health and safety. The principal guidance available to the NRC, however, was developed more than ten years ago, well before these technological changes. Accordingly, the human factors guidance needs to be updated to serve as the basis for NRC review of these advanced designs. The purpose of this project was to develop a general approach to advanced HSI review and the human factors guidelines to support. NRC safety reviews of advanced systems. This two-volume report provides the results of the project. Volume I describes the development of the Advanced HSI Design Review Guideline (DRG) including (1) its theoretical and technical foundation, (2) a general model for the review of advanced HSIs, (3) guideline development in both hard-copy and computer-based versions, and (4) the tests and evaluations performed to develop and validate the DRG. Volume I also includes a discussion of the gaps in available guidance and a methodology for addressing them. Volume 2 provides the guidelines to be used for advanced HSI review and the procedures for their use

  7. PWR secondary water chemistry guidelines

    International Nuclear Information System (INIS)

    Bell, M.J.; Blomgren, J.C.; Fackelmann, J.M.

    1982-10-01

    Steam generators in pressurized water reactor (PWR) nuclear power plants have experienced tubing degradation by a variety of corrosion-related mechanisms which depend directly on secondary water chemistry. As a result of this experience, the Steam Generator Owners Group and EPRI have sponsored a major program to provide solutions to PWR steam generator problems. This report, PWR Secondary Water Chemistry Guidelines, in addition to presenting justification for water chemistry control parameters, discusses available analytical methods, data management and surveillance, and the management philosophy required to successfully implement the guidelines

  8. Cost analysis guidelines

    International Nuclear Information System (INIS)

    Strait, R.S.

    1996-01-01

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy's (DOE's) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies

  9. Developing an action-based health and safety training project in southern China.

    Science.gov (United States)

    Szudy, Betty; O'Rourke, Dara; Brown, Garrett D

    2003-01-01

    A project brought together international footwear manufacturers, labor rights groups, local contract factories, and occupational health professionals to strengthen factory health and safety programs in southern China. Steps involved in the two-year project, including needs assessment, interviews and focus groups with workers and supervisors; design and development of a participatory workshop; development of plant-wide health and safety committees in three footwear factories; and evaluation project impact, are discussed. The project significantly increased occupational safety and health knowledge, and hazards in the factories were identified and corrected. Successes and challenges faced by three functioning worker-management health and safety committees are discussed. Key elements to create effective programs with meaningful participation by workers include: 1) developing clear guidelines that enable multi-stakeholder groups to collaborate; 2) obtaining top-level management support; 3) building workers' knowledge and capacity to fully participate; 4) involving local labor rights groups and occupational professionals in support and technical assistance; and 5) connecting project goals to larger issues within a country and the global economy.

  10. Evaluation of Current Automated Civil Engineer System Non-Appropriated Funds Project Programming Procedures

    National Research Council Canada - National Science Library

    Ligday, Joshua

    2004-01-01

    ...) project programming business rules within ACES. These problem areas were not addressed until recently when an integrated process team met and proposed numerous changes to how NAF programming is accomplished in ACES...

  11. Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP-1131, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996. This QAPP has been developed specifically for the BCCP. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of decontaminating B-Cell and project related operations within the 324 Building as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations) are covered in the Building 324 QAPP. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping, and HSRCM-1, Hanford Site Radiological Control Manual, The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing, PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to 10 CFR 83 0.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be

  12. Long-term pavement performance compliance with Department of Transportation information dissemination quality guidelines

    Science.gov (United States)

    2008-11-01

    This document provides information on the compliance of the LTPP program with the guidelines the Department of Transportation (DOT) issued Information Dissemination Quality Guidelines (IDQG). These guidelines were developed in response to requirement...

  13. Space station pressurized laboratory safety guidelines

    Science.gov (United States)

    Mcgonigal, Les

    1990-01-01

    Before technical safety guidelines and requirements are established, a common understanding of their origin and importance must be shared between Space Station Program Management, the User Community, and the Safety organizations involved. Safety guidelines and requirements are driven by the nature of the experiments, and the degree of crew interaction. Hazard identification; development of technical safety requirements; operating procedures and constraints; provision of training and education; conduct of reviews and evaluations; and emergency preplanning are briefly discussed.

  14. An overview of environment Canada's National Incinerator Testing and Evaluation Program (NITEP)

    International Nuclear Information System (INIS)

    Finkelstein, A.

    1991-01-01

    In response to the many concerns associated with incineration, Environment Canada established the National Incineration Testing and evaluation Program (NITEP) in 1984. It's mission was to assess the incineration process as a means for disposal of MSW in Canada. The program primarily focused on the environment and health impacts of MSW incinerators by determining how design and operating conditions can be modified to reduce emissions of concern. In addition to developing better measuring and monitoring methods, supporting ash residue management research programs, NITEP established four major field projects to develop the data base necessary for national guidelines. This paper presents a brief overview of the most significant field program findings over the past six years and the rationale for the Canadian Council of Ministers of the Environment (CCME) Operating and Emissions Guidelines for MSW Incinerators published in June of 1989. In addition an overview of the ash work completed to date, and work still underway, will be presented

  15. Comparing and contrasting current guidelines for venous thromboembolism prophylaxis after total hip and total knee arthroplasty.

    Science.gov (United States)

    Lachiewicz, Paul F

    2011-01-01

    Orthopaedic surgeons may be impacted by three different clinical venous thromboembolism guidelines: the American College of Chest Physicians guidelines, the Surgical Care Improvement Project guidelines, and, most recently, the American Academy of Orthopaedic Surgeons (AAOS) guideline. The American College of Chest Physicians guidelines use deep venous thrombosis detected by venography or ultrasonography as their primary outcome measure. High-grade recommendations are based on prospective randomized studies only, usually comparing one pharmacologic agent to another. The Surgical Care Improvement Project guidelines are essentially based on the 2004 American College of Chest Physicians guidelines and seek to determine if surgeons prescribe venous thromboembolism prophylaxis within 24 hours of admission. Compliance with these guidelines may affect the quality rating of a particular hospital. The AAOS guideline was designed with the clinical outcome measures of symptomatic pulmonary embolism, fatal pulmonary embolism, major bleeding, and all-cause mortality. This guideline recommends that surgeons preoperatively evaluate the patient's risks (standard or elevated) for pulmonary embolism and serious bleeding and individualize pharmacologic prophylaxis based on a risk-benefit ratio. The three guidelines all have advantages and disadvantages.

  16. A benchmarking project on the quality of previous guidelines about the management of malignant pleural effusion from the European Society of Thoracic Surgeons (ESTS) Pleural Diseases Working Group.

    Science.gov (United States)

    Bertolaccini, Luca; Bedetti, Benedetta; Brunelli, Alessandro; Marinova, Katerina; Raveglia, Federico; Rocco, Gaetano; Shargall, Yaron; Solli, Piergiorgio; Varela, Gonzalo; Papagiannopoulos, Kostas; Kuzdzal, Jaroslaw; Massard, Gilbert; Ruffini, Enrico; Falcoz, Pierre-Emmanuel; Martinez-Barenys, Carlos; Opitz, Isabelle; Batirel, Hasan F; Toker, Alper; Scarci, Marco

    2017-08-01

    In the European Society of Thoracic Surgeons (ESTS) survey about management of malignant pleural effusions (MPE), 56% of respondents are not informed of any relevant clinical guidelines and 52%, who are aware of the existence of guidelines, declared that they are in need of updating or revision. The ESTS Pleural Diseases Working Group developed a benchmarking project on quality of previous guidelines on the management of MPE. The Appraisal of Guidelines for Research and Evaluation (AGREE) II instrument was used to assess each guideline. Each item was scored on a 7-point scale. Scores for each domain were calculated. Economic data for the nations which have issued the guidelines were collected from the Organisation for Economic Cooperation and Development health statistics database. Six guidelines fitted the inclusion criteria and were assessed. Five out of 6 guidelines were produced by a multinational collaboration. Observers would recommend only 2 guidelines with minimal modification. Two areas that received the best score were clarity of presentation and scope and purpose (objectives and health questions target population). The applicability of guideline domain had the lowest score. Multivariate analysis demonstrated that clarity of presentation, international guidelines and publication through medical journal were related to improved scores. A strong correlation was observed between the measures of economic status. The quality of guidelines assessed by the AGREE II criteria was found to be extremely variable. Guidelines achieving higher AGREE II scores were more likely to come from the European Union with the direct involvement of scientific societies in their development. It was also recognized that some fundamental unanswered questions remain about the management of MPE. © The Author 2017. Published by Oxford University Press on behalf of the European Association for Cardio-Thoracic Surgery. All rights reserved.

  17. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  18. The political anatomy of a guideline: a collaborative effort to develop the AHCPR-sponsored practice guideline on otitis media with effusion.

    Science.gov (United States)

    Sebring, R H; Herrerias, C T

    1996-06-01

    In July 1991 the Agency for Health Care Policy and Research (AHCPR) invited private organizations to develop a practice guideline on otitis media. The American Academy of Pediatrics (AAP) collaborated with the American Academy of Family Physicians, the American Academy of Otolaryngology-Head and Neck Surgery, and the Department of Pediatric Otolaryngology at the University of Pittsburgh in preparing a proposal. The AAP--the prime contractor--and the consortium were awarded the contract in October 1991. The 19-member panel assessed evidence and achieved consensus on most recommendations and maintained positive relationships that helped them function as a group. The practice guideline project has influenced the AAP's own evidence-based practice parameter methodology. Many lessons were learned. For example, since any project is only as strong as its weakest link, it was important to build the proposal on organizational strengths--including access to a combined 244,000 members and other resources. The weak links were the large number of persons involved in the project, their varying time commitments, and the wide geographic distribution of those involved. Also, neither AHCPR nor any of the organizations involved in the consortium had previous government contract experience in developing practice guidelines, so that much of the process became "on-the-job training". Research is needed to determine the extent to which the otitis media guideline is being used. The three academies are conducting a follow-up practice pattern variation study of pediatricians, family physicians, and otolaryngologists, which may provide data on behavior change with regard to managing the condition.

  19. Transportation risk management : international practices for program development and project delivery.

    Science.gov (United States)

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  20. NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion

    International Nuclear Information System (INIS)

    Marshall, A.C.; Lee, J.H.; McCulloch, W.H.; Sawyer, J.C. Jr.; Bari, R.A.; Brown, N.W.; Cullingford, H.S.; Hardy, A.C.; Remp, K.; Sholtis, J.A.

    1992-01-01

    An Interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top- level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed

  1. USL/DBMS NASA/PC R and D project C programming standards

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Moreau, Dennis R.

    1984-01-01

    A set of programming standards intended to promote reliability, readability, and portability of C programs written for PC research and development projects is established. These standards must be adhered to except where reasons for deviation are clearly identified and approved by the PC team. Any approved deviation from these standards must also be clearly documented in the pertinent source code.

  2. Working group reports: evaluation of the evidence to support practice guidelines for nutritional care of preterm infants-the Pre-B Project.

    Science.gov (United States)

    Raiten, Daniel J; Steiber, Alison L; Carlson, Susan E; Griffin, Ian; Anderson, Diane; Hay, William W; Robins, Sandra; Neu, Josef; Georgieff, Michael K; Groh-Wargo, Sharon; Fenton, Tanis R

    2016-02-01

    The "Evaluation of the Evidence to Support Practice Guidelines for the Nutritional Care of Preterm Infants: The Pre-B Project" is the first phase in a process to present the current state of knowledge and to support the development of evidence-informed guidance for the nutritional care of preterm and high-risk newborn infants. The future systematic reviews that will ultimately provide the underpinning for guideline development will be conducted by the Academy of Nutrition and Dietetics' Evidence Analysis Library (EAL). To accomplish the objectives of this first phase, the Pre-B Project organizers established 4 working groups (WGs) to address the following themes: 1) nutrient specifications for preterm infants, 2) clinical and practical issues in enteral feeding of preterm infants, 3) gastrointestinal and surgical issues, and 4) current standards of infant feeding. Each WG was asked to 1) develop a series of topics relevant to their respective themes, 2) identify questions for which there is sufficient evidence to support a systematic review process conducted by the EAL, and 3) develop a research agenda to address priority gaps in our understanding of the role of nutrition in health and development of preterm/neonatal intensive care unit infants. This article is a summary of the reports from the 4 Pre-B WGs. © 2016 American Society for Nutrition.

  3. An e-learning supported Train-the-Trainer program to implement a suicide practice guideline. Rationale, content and dissemination in Dutch mental health care.

    NARCIS (Netherlands)

    Groot, M. de; Beurs, D.P. de; Keijser, J. de; Kerkhof, A.F.J.M.

    2015-01-01

    An e-learning supported Train-the-Trainer program was developed to implement the Dutch suicide practice guideline inmental health care. Literature on implementation strategies has been restricted to the final reporting of studieswith little opportunity to describe relevant contextual, developmental

  4. Design of the Balance@Work project: systematic development, evaluation and implementation of an occupational health guideline aimed at the prevention of weight gain among employees

    Directory of Open Access Journals (Sweden)

    Weel Andre NH

    2009-12-01

    Full Text Available Abstract Background Occupational health professionals may play an important role in preventive health promotion activities for employees. However, due to a lack of knowledge and evidence- and practice based methods and strategies, interventions are hardly being implemented by occupational physicians to date. The aim of the Balance@Work project is to develop, evaluate, and implement an occupational health guideline aimed at the prevention of weight gain among employees. Methods Following the guideline development protocol of the Netherlands Society of Occupational Medicine and the Intervention Mapping protocol, the guideline was developed based on literature, interviews with relevant stakeholders, and consensus among an expert group. The guideline consists of an individual and an environmental component. The individual component includes recommendations for occupational physicians on how to promote physical activity and healthy dietary behavior based on principles of motivational interviewing. The environmental component contains an obesogenic environment assessment tool. The guideline is evaluated in a randomised controlled trial among 20 occupational physicians. Occupational physicians in the intervention group apply the guideline to eligible workers during 6 months. Occupational physicians in the control group provide care as usual. Measurements take place at baseline and 6, 12, and 18 months thereafter. Primary outcome measures include waist circumference, daily physical activity and dietary behavior. Secondary outcome measures include sedentary behavior, determinants of behavior change, body weight and body mass index, cardiovascular disease risk profile, and quality of life. Additionally, productivity, absenteeism, and cost-effectiveness are assessed. Discussion Improving workers' daily physical activity and dietary behavior may prevent weight gain and subsequently improve workers' health, increase productivity, and reduce absenteeism

  5. Design of the Balance@Work project: systematic development, evaluation and implementation of an occupational health guideline aimed at the prevention of weight gain among employees.

    Science.gov (United States)

    Verweij, Lisanne M; Proper, Karin I; Weel, Andre N H; Hulshof, Carel T J; van Mechelen, Willem

    2009-12-14

    Occupational health professionals may play an important role in preventive health promotion activities for employees. However, due to a lack of knowledge and evidence- and practice based methods and strategies, interventions are hardly being implemented by occupational physicians to date. The aim of the Balance@Work project is to develop, evaluate, and implement an occupational health guideline aimed at the prevention of weight gain among employees. Following the guideline development protocol of the Netherlands Society of Occupational Medicine and the Intervention Mapping protocol, the guideline was developed based on literature, interviews with relevant stakeholders, and consensus among an expert group. The guideline consists of an individual and an environmental component. The individual component includes recommendations for occupational physicians on how to promote physical activity and healthy dietary behavior based on principles of motivational interviewing. The environmental component contains an obesogenic environment assessment tool. The guideline is evaluated in a randomised controlled trial among 20 occupational physicians. Occupational physicians in the intervention group apply the guideline to eligible workers during 6 months. Occupational physicians in the control group provide care as usual. Measurements take place at baseline and 6, 12, and 18 months thereafter. Primary outcome measures include waist circumference, daily physical activity and dietary behavior. Secondary outcome measures include sedentary behavior, determinants of behavior change, body weight and body mass index, cardiovascular disease risk profile, and quality of life. Additionally, productivity, absenteeism, and cost-effectiveness are assessed. Improving workers' daily physical activity and dietary behavior may prevent weight gain and subsequently improve workers' health, increase productivity, and reduce absenteeism. After an effect- and process evaluation the guideline will be

  6. 75 FR 75532 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2010-12-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This notice announces and solicits comments on the fifth audit report for the...

  7. 76 FR 5237 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2011-01-28

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the fifth FHWA audit of the...

  8. 77 FR 26355 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Science.gov (United States)

    2012-05-03

    ...] Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report AGENCY: Federal Highway... participating in the Pilot Program, 23 U.S.C. 327(g) mandates semiannual audits during each of the first 2 years of State participation. This final report presents the findings from the sixth FHWA audit of the...

  9. Project EX-India: A classroom-based tobacco use prevention and cessation intervention program.

    Science.gov (United States)

    Sidhu, Anupreet Kaur; Sussman, Steve; Tewari, Abha; Bassi, Shalini; Arora, Monika

    2016-02-01

    Tobacco use experimentation is most frequent between the ages of 15–24 in India. Therefore, programming to counteract tobacco use among adolescents is needed. There is a lack of evidence-based teen tobacco use prevention and cessation programs. The current study provides an outcome evaluation of the Project EX tobacco use prevention and cessation program among Indian adolescents (16–18 years). An eight-session classroom-based curriculum was adapted to the Indian context and translated from English to Hindi (local language). Next, it was tested using a quasi-experimental design with 624 Indian students at baseline, involving two program and two control schools, with a three-month post-program follow-up. Project EX involves motivation enhancement (e.g., talk shows and games) and coping skills (e.g., complementary and alternative medicine) components. Program participants rated complementary and alternative medicine (CAM) activities like meditation, yoga and healthy breathing higher than talk shows and games. Compared to the standard care control condition, the program condition revealed a prevention effect, but not a cessation effect. Implications for prevention/cessation programming among Indian teens are discussed. This study was approved by the Independent Ethics Committee, Mumbai.

  10. Siting guidelines and their role in repository site selection

    International Nuclear Information System (INIS)

    Hanlon, C.L.

    1985-01-01

    The first requirement of the Nuclear Waste Policy Act was for the Secretary of Energy to issue general guidelines for siting repositories. The guidelines were to specify detailed geologic considerations that would be the primary criteria for the selection of sites in various host rocks, as well as factors that would qualify or disqualify any site from development as a repository. These guidelines were clearly intended to provide not only the framework for the siting program but also the stimulus for establishing effective communication and consultation among the parties involved in the program. The Act further required that the guidelines be a factor in the development of all future decision documents of the Office of Civilian Radioactive Waste Management, including the environmental assessments that would accompany the nomination of sites for characterization, the site-characterization plans that are to be prepared before the sinking of exploratory shafts at any candidate site, and the environmental impact statement that is to support the recommendation of a site for development as a repository. More than two years after its passage, the intention of the Act for the guidelines has been realized. Concurred in by the Nuclear Regulatory Commission on June 22, 1984, and issued by the Department in November 1984, the guidelines include postclosure technical guidelines that apply to conditions governing the long-term performance of the repository system; preclosure technical guidelines that apply to conditions governing the siting, construction, operation, and closure of the repository; and system guidelines whose objective is to ensure that the regulatory requirements of the Environmental Protection Agency and the Nuclear Regulatory Commission are met

  11. The Impact of the Project K Youth Development Program on Self-Efficacy: A Randomized Controlled Trial.

    Science.gov (United States)

    Deane, Kelsey L; Harré, Niki; Moore, Julie; Courtney, Matthew G R

    2017-03-01

    A key issue for youth development programs is whether the learning they provide is transferred to participants' daily lives. It is also important that they are effective for the diverse range of participants they attract. This study used a randomized controlled trial design to measure the impact of Project K, a New Zealand-based youth development program, on academic and social self-efficacy. Project K combines a 3-week wilderness adventure, a 10 day community service component, and 1 year of mentoring to promote positive growth in 14-15 year olds with low self-efficacy. At baseline, the evaluation included 600 Project K (46 % female) and 577 Control participants (48 % female) and revealed that Project K was effective in improving both social and academic self-efficacy from pre- to post-program with effects being sustained 1 year later. Parents' perceptions of changes in the participants' interpersonal skills supported these findings. Differential program effects were found across participant subgroups, particularly 1 year after program completion. The implications of these differences are discussed.

  12. Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

    Science.gov (United States)

    Stewart, Camiren L.

    2014-01-01

    With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its

  13. 23 CFR 661.23 - How will a bridge project be programmed for funding once eligibility has been determined?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... bridge project be programmed for funding once eligibility has been determined? (a) All projects will be... time, the project will be acknowledged as either BIA and Tribally owned, or non-BIA owned and placed in...

  14. Diretrizes para um Programa de Recolhimento de Medicamentos Vencidos no Brasil Guidelines for an Expired Medication Collection Program in Brazil

    Directory of Open Access Journals (Sweden)

    Débora Cynamon Kligerman

    2013-03-01

    Full Text Available O objetivo deste artigo é apontar e discutir diretrizes fundamentais para um programa de recolhimento de medicamentos vencidos para o Brasil e evidenciar a importância de campanhas de conscientização da população para seu sucesso. Este é um trabalho de revisão descritiva de base documental que analisa documentos oficiais, técnicos e normativos, de Portugal, México, Canadá e Colômbia, onde existem recolhimento de medicamentos vencidos em diferentes estágios de implementação, alguns já consolidados, outros em fase inicial, mas todos com bons resultados. Os países citados foram escolhidos objetivando-se representação da Europa, América do Norte e América Latina. Seis diretrizes comuns foram apontadas: corresponsabilidade na cadeia de fabricação e distribuição do medicamento; minimização de resíduos como estratégia; realização de programa piloto; investigação e classificação dos resíduos gerados; intersetorialidade entre diferentes esferas do governo e campanhas de sensibilização e conscientização da comunidade. Estas diretrizes constituem uma base para um Programa de Recolhimento de Medicamentos Usados no Brasil.The scope of this paper is to outline and discuss fundamental guidelines for an expired medication collection program for Brazil and to provide evidence supporting campaigns to raise the population's awareness for the program's success. It is a document-based descriptive review that analyzes official, technical and regulatory documents from Portugal, Canada and Colombia, where there are expired medication collection programs in different stages of implementation. Some of them are already fully implemented, while others are in the preliminary stages, but all of them are achieving good results. The countries listed above were chosen in order to represent Europe, North America and Latin America. Six common guidelines were outlined: co-responsibility in the drug's manufacturing and distribution chain; a

  15. 75 FR 6354 - NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes Restoration...

    Science.gov (United States)

    2010-02-09

    ...-04] RIN 0648-ZC10 NOAA Great Lakes Habitat Restoration Program Project Grants under the Great Lakes... Atmospheric Administration (NOAA), Department of Commerce. ACTION: Notice of funding availability; Date... on January 19, 2010. That notice announced the NOAA Great Lakes Habitat Restoration Program Project...

  16. Spillover effects of HIV testing policies: changes in HIV testing guidelines and HCV testing practices in drug treatment programs in the United States

    Directory of Open Access Journals (Sweden)

    Jemima A. Frimpong

    2016-07-01

    Full Text Available Abstract Background To examine the extent to which state adoption of the Centers for Disease Control and Prevention (CDC 2006 revisions to adult and adolescent HIV testing guidelines is associated with availability of other important prevention and medical services. We hypothesized that in states where the pretest counseling requirement for HIV testing was dropped from state legislation, substance use disorder treatment programs would have higher availability of HCV testing services than in states that had maintained this requirement. Methods We analyzed a nationally representative sample of 383 opioid treatment programs from the 2005 and 2011 National Drug Abuse Treatment System Survey (NDATSS. Data were collected from program directors and clinical supervisors through telephone surveys. Multivariate logistic regression models were used to measure associations between state adoption of CDC recommended guidelines for HIV pretest counseling and availability of HCV testing services. Results The effects of HIV testing legislative changes on HCV testing practices varied by type of opioid treatment program. In states that had removed the requirement for HIV pretest counseling, buprenorphine-only programs were more likely to offer HCV testing to their patients. The positive spillover effect of HIV pretest counseling policies, however, did not extend to methadone programs and did not translate into increased availability of on-site HCV testing in either program type. Conclusions Our findings highlight potential positive spillover effects of HIV testing policies on HCV testing practices. They also suggest that maximizing the benefits of HIV policies may require other initiatives, including resources and programmatic efforts that support systematic integration with other services and effective implementation.

  17. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2013-02-06

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Brum, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave... to industry's drug development processes and (2) a venue for sharing information about project...

  18. A methodological survey identified eight proposed frameworks for the adaptation of health related guidelines.

    Science.gov (United States)

    Darzi, Andrea; Abou-Jaoude, Elias A; Agarwal, Arnav; Lakis, Chantal; Wiercioch, Wojtek; Santesso, Nancy; Brax, Hneine; El-Jardali, Fadi; Schünemann, Holger J; Akl, Elie A

    2017-06-01

    Our objective was to identify and describe published frameworks for adaptation of clinical, public health, and health services guidelines. We included reports describing methods of adaptation of guidelines in sufficient detail to allow its reproducibility. We searched Medline and EMBASE databases. We also searched personal files, as well manuals and handbooks of organizations and professional societies that proposed methods of adaptation and adoption of guidelines. We followed standard systematic review methodology. Our search captured 12,021 citations, out of which we identified eight proposed methods of guidelines adaptation: ADAPTE, Adapted ADAPTE, Alberta Ambassador Program adaptation phase, GRADE-ADOLOPMENT, MAGIC, RAPADAPTE, Royal College of Nursing (RCN), and Systematic Guideline Review (SGR). The ADAPTE framework consists of a 24-step process to adapt guidelines to a local context taking into consideration the needs, priorities, legislation, policies, and resources. The Alexandria Center for Evidence-Based Clinical Practice Guidelines updated one of ADAPTE's tools, modified three tools, and added three new ones. In addition, they proposed optionally using three other tools. The Alberta Ambassador Program adaptation phase consists of 11 steps and focused on adapting good-quality guidelines for nonspecific low back pain into local context. GRADE-ADOLOPMENT is an eight-step process based on the GRADE Working Group's Evidence to Decision frameworks and applied in 22 guidelines in the context of national guideline development program. The MAGIC research program developed a five-step adaptation process, informed by ADAPTE and the GRADE approach in the context of adapting thrombosis guidelines. The RAPADAPTE framework consists of 12 steps based on ADAPTE and using synthesized evidence databases, retrospectively derived from the experience of producing a high-quality guideline for the treatment of breast cancer with limited resources in Costa Rica. The RCN outlines

  19. Compliance with guideline-directed therapy in diabetic patients admitted with acute coronary syndrome: Findings from the American Heart Association's Get With The Guidelines-Coronary Artery Disease (GWTG-CAD) program.

    Science.gov (United States)

    Deedwania, Prakash; Acharya, Tushar; Kotak, Kamal; Fonarow, Gregg C; Cannon, Christopher P; Laskey, Warren K; Peacock, W Frank; Pan, Wenqin; Bhatt, Deepak L

    2017-05-01

    To evaluate and compare baseline characteristics, outcomes and compliance with guideline based therapy at discharge among diabetic and non-diabetic patients admitted with acute coronary syndromes (ACS). Study population consisted of 151,270 patients admitted with ACS from 2002 through 2008 at 411 sites participating in the American Heart Association's Get with the Guidelines (GWTG) program. Demographic variables, physical exam findings, laboratory data, left ventricular ejection fraction, length of stay, in-hospital mortality and discharge medications were compared between diabetic and non-diabetic patients. Temporal trends in compliance with guidelines directed therapy were evaluated. Of 151,270 patients, 48,938 (32%) had diabetes. Overall, diabetic patients were significantly older and more likely non-white. They had significantly more hypertension, atherosclerotic disease, CKD, and LV dysfunction and were more likely to present as NSTEMI. They had longer hospital stay and higher hospital mortality than non-diabetic patients. Diabetic patients were less likely to get LDL checks (65% vs 70%) and less frequently prescribed statins (85% vs 89%), RAAS blockers for LV dysfunction (80% vs 84%) and dual-antiplatelet therapy (69% vs 74%). Diabetic patients were less likely to achieve BP goals before discharge (75% vs 82%). Fewer diabetic patients met first medical contact to PCI time for STEMI (44% vs 52%). Temporal trends, however, showed continued progressive improvement in most performance measures from 2002 to 2008 (all P<.001). These data from a large cohort of ACS patients demonstrate gaps in compliance with guidelines directed therapy in diabetic patients but also indicate significant and continued improvement in most performance measures over time. Concerted efforts are needed to continue this positive trend. Copyright © 2017. Published by Elsevier Inc.

  20. Nuclear Power Infrastructure Development Program: Korean Education Program

    International Nuclear Information System (INIS)

    Choi, Sung Yeol; Hwang, Il Soon; Kim, Si Hwan

    2009-01-01

    Many countries have decided nuclear power for next energy resources as one of the long-term energy supply options. IAEA projected nuclear power expansion up to 2030 reaching between 447 GWe and 691 GWe compared to 370 GWe and 2660 TWh at the end of 2006. Both low and high projection is accompanied with new nuclear power plant constructions respectively 178 and 357, about 11 units per year, and most new construction is in North America, the Far East, Eastern Europe, the Middle East, and Southeast Asia. During the last forty years, thirty three countries have established commercial nuclear power programs but only some of them have developed comprehensive and large scale peaceful nuclear power infrastructure. Although various cooperation and guidance program of nuclear power infrastructure, developing appropriate environment and infrastructure of nuclear power plant is still challenging problems for developing countries launching nuclear power program. With increasing the demand of safety and safeguard from international society, creating appropriate infrastructure becomes essential requirements in national nuclear power program. In the viewpoint of developing countries, without sufficient explanation and proper guidance, infrastructure could be seen only as another barrier in its nuclear power program. The importance of infrastructure development would be obscured by ostensible business and infrastructure program can result in increasing entering barriers to peaceful nuclear power application field without benefits to developing countries and international community. To avoid this situation by providing enough explanation and realistic case example and cooperate with the countries wanting to establish comprehensive nuclear power infrastructure in the peaceful applications, we are creating the education program of infrastructure development with basic guidelines of the IAEA infrastructure series and Korean experiences from least developed country to advanced country

  1. Digitizing geographic data with GRIDOT; a generalized program for drawing overlay grids in various map projections

    International Nuclear Information System (INIS)

    Edwards, R.G.; Durfee, R.C.

    1976-09-01

    The GRIDOT computer program draws overlay grids on a Calcomp plotter for use in digitizing information from maps, rectified aerial photographs, and other sources of spatially distributed data related to regional environmental problems. The options of the program facilitate use of the overlays with standard maps and map projections of the continental United States. The overlay grid may be defined as a latitude-longitude grid (geodetic grid), a Universal Transverse Mercator Grid, or one of the standard state-plane coordinate system grids. The map for which the overlay is intended may be in an Albers Equal Area projection, a Lambert Conformal projection, a Polyconic projection, a Transverse Mercator projection, a Universal Transverse Mercator projection, or any of the standard state-plane projections

  2. Interoperability Guidelines for Lithuanian E-Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Eugenijus Kurilovas

    2011-08-01

    Full Text Available Purpose – the paper aims to analyse e-learning content and repositories along with the problems of learning organisation interoperability. The main objective of the paper is to analyse scientific research results and the newest international experience in the area and to provide interoperability guidelines and recommendations for the implementation of appropriate Lithuanian state programmes. The learning content and repositories recommendations are designed for the implementation of the Lithuanian education portal project as well as Lithuanian Virtual University (LVU programme’s information services’ (LABT / eLABa and e-learning services’ (LieDM sub-programmes. The whole education institution recommendations are designed for the maintenance and development of LVU programme’s management services’ (LieMSIS system.Design/methodology/approach – methods used for the general analysis of proposed interoperability guidelines (reccomendations were bibliographic research and comparative analysis of Lithuanian and foreign scientific works published in periodicals and large-scale EU-funded interoperability projects deliverables. System analysis and comparative analysis methods were used in order to formulate and analyse systems’ interoperability guidelines and recommendations. The author employed the experimental research method while working in the appropriate EU-funded interoperability projects to form the guidelines (recommendations. In order to summarize the results, the evaluative research method was used..Findings – the international guidelines and recommendations presented in the paper could be suitable for implementation while developing Lithuanian state education information systems such as the Lithuanian education portal, the Lithuanian academic libraries’ (eLABa system, the Lithuanian distance learning system (LieDM, and the Lithuanian universities’ management system (LieMSIS.Research limitations/implications – the paper

  3. Interoperability Guidelines for Lithuanian E-Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Eugenijus Kurilovas

    2013-08-01

    Full Text Available Purpose – the paper aims to analyse e-learning content and repositories along with the problems of learning organisation interoperability. The main objective of the paper is to analyse scientific research results and the newest international experience in the area and to provide interoperability guidelines and recommendations for the implementation of appropriate Lithuanian state programmes. The learning content and repositories recommendations are designed for the implementation of the Lithuanian education portal project as well as Lithuanian Virtual University (LVU programme’s information services’ (LABT / eLABa and e-learning services’ (LieDM sub-programmes. The whole education institution recommendations are designed for the maintenance and development of LVU programme’s management services’ (LieMSIS system.Design/methodology/approach – methods used for the general analysis of proposed interoperability guidelines (reccomendations were bibliographic research and comparative analysis of Lithuanian and foreign scientific works published in periodicals and large-scale EU-funded interoperability projects deliverables. System analysis and comparative analysis methods were used in order to formulate and analyse systems’ interoperability guidelines and recommendations. The author employed the experimental research method while working in the appropriate EU-funded interoperability projects to form the guidelines (recommendations. In order to summarize the results, the evaluative research method was used.Findings – the international guidelines and recommendations presented in the paper could be suitable for implementation while developing Lithuanian state education information systems such as the Lithuanian education portal, the Lithuanian academic libraries’ (eLABa system, the Lithuanian distance learning system (LieDM, and the Lithuanian universities’ management system (LieMSIS.Research limitations/implications – the paper

  4. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  5. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report

  6. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

  7. Core Activities Program. TMI-2 Core Receipt and Storage Project Plan

    International Nuclear Information System (INIS)

    Ayers, A.L. Jr.

    1984-12-01

    The TMI-2 Core Receipt and Storage Project is funded by the US Department of Energy and managed by the Technical Support Branch of EG and G Idaho, Inc. at the Idaho National Engineering Laboratory (INEL). As part of the Core Activities Program, this project will include: (a) preparations for receipt and storage of the Three Mile Island Unit 2 core debris at INEL; and (b) receipt and storage operations. This document outlines procedures; project management; safety, environment, and quality; safeguards and security; deliverables; and cost and schedule for the receipt and storage activities at INEL

  8. 1982 environmental-monitoring program report for the West Valley Demonstration Project site

    International Nuclear Information System (INIS)

    1983-05-01

    This report is prepared and submitted in accordance with the requirements of DOE Order 5484.1 and presents environmental monitoring program data collected at the West Valley Demonstration Project (WVDP) site from February 26, 1982, through December 31, 1982. The WVDP objective is to solidify approximately 600,000 gallons of high-level liquid radioactive waste stored at the former Nuclear Fuel Services reprocessing facility at West Valley, New York. Nuclear Fuel Services conducted an environmental monitoring program in accordance with Nuclear Regulatory Commission requirements which were appropriate for shutdown maintenance operations conducted at the site. That program was embraced by West Valley Nuclear Services Company (WVNS) at the time of transition (February 26, 1982) and will be modified to provide a comprehensive monitoring program in preparation for waste solidification operations scheduled for startup in June 1988. As such, the data presented in this report is considered preoperational in nature in accordance with DOE Order 5484.1, Chapter III, Paragraph 1. The environmental monitoring program planned for the operating phase of the project will be fully implemented by fiscal year 1985 and will provide at least two years of preoperational data prior to startup

  9. Water conservation and allocation guideline for oilfield injection

    International Nuclear Information System (INIS)

    2006-01-01

    This paper was prepared as a guide for regulatory agencies and developers using non-saline water sources in enhanced oil recovery (EOR) schemes. A systems approach was used to achieve specific environmental outcomes that adhered to the Water Conservation and Allocation Policy for Oilfield Injection. The guide was applicable to licence renewal applications for projects operating and licensed to use non-saline water resources, as well as new licence applications for oilfield injection use. The guide provided recommended water conservation practices and application requirements, and outlined regulatory procedures and steps for obtaining a Water Act licence. The guideline was prepared to eliminate the use of non-saline water in EOR projects where feasible alternatives existed, as well as to identify areas with water shortages and reduce the use of non-saline water. The guide included monitoring and reporting requirements to improve the evaluation of water use practices and outlined current initiatives to address water conservation and research. It was concluded that outcomes from the program will include reliable quality water supplies for a sustainable economy, healthy aquatic ecosystems, and safe, secure drinking water supplies for Albertans. 3 tabs., 5 figs

  10. Assessing the Impact and Effectiveness of the Advanced Technological Education (ATE) Program. Survey Results 2004. Volume III: Status of ATE Projects and Articulation Partnerships

    Science.gov (United States)

    Coryn, Chris L.; Gullickson, Arlen R.; Hanssen, Carl E.

    2004-01-01

    The Advanced Technological Education (ATE) program is a federally funded program designed to educate technicians for the high-technology disciplines that drive the United State's economy. As stated in the ATE program guidelines, this program promotes improvement in technological education at the undergraduate and secondary school levels by…

  11. NASA Small Business Innovation Research Program. Composite List of Projects, 1983 to 1989

    Science.gov (United States)

    1990-01-01

    The NASA SBIR Composite List of Projects, 1983 to 1989, includes all projects that have been selected for support by the Small Business Innovation Research (SBIR) Program of NASA. The list describes 1232 Phase 1 and 510 Phase 2 contracts that had been awarded or were in negotiation for award in August 1990. The main body is organized alphabetically by name of the small businesses. Four indexes cross-reference the list. The objective of this listing is to provide information about the SBIR program to anyone concerned with NASA research and development activities.

  12. Applying established guidelines to team-based learning programs in medical schools: a systematic review.

    Science.gov (United States)

    Burgess, Annette W; McGregor, Deborah M; Mellis, Craig M

    2014-04-01

    Team-based learning (TBL), a structured form of small-group learning, has gained popularity in medical education in recent years. A growing number of medical schools have adopted TBL in a variety of combinations and permutations across a diversity of settings, learners, and content areas. The authors conducted this systematic review to establish the extent, design, and practice of TBL programs within medical schools to inform curriculum planners and education designers. The authors searched the MEDLINE, PubMed, Web of Knowledge, and ERIC databases for articles on TBL in undergraduate medical education published between 2002 and 2012. They selected and reviewed articles that included original research on TBL programs and assessed the articles according to the seven core TBL design elements (team formation, readiness assurance, immediate feedback, sequencing of in-class problem solving, the four S's [significant problem, same problem, specific choice, and simultaneous reporting], incentive structure, and peer review) described in established guidelines. The authors identified 20 articles that satisfied the inclusion criteria. They found significant variability across the articles in terms of the application of the seven core design elements and the depth with which they were described. The majority of the articles, however, reported that TBL provided a positive learning experience for students. In the future, faculty should adhere to a standardized TBL framework to better understand the impact and relative merits of each feature of their program.

  13. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  14. Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-03-30

    ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.

  15. Native flora rescue program: GASENE project case study

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V [PETROBRAS, Rio de Janeiro, RJ (Brazil); Akahori, Lisa [Telsan, Rio de Janeiro, RJ (Brazil); Jacomelli, Junior, Jose Almir [AGF Engenharia, Araucaria, PR (Brazil)

    2009-07-01

    Concerning the surrounding flora, the implementation of pipelines may cause fragmentation and isolation of the remaining natural vegetation, possibly changing the forest structure; thus raising the border effect; modifying the ratio of species and life forms, decreasing the vegetal diversity and/or causing a lack of connectivity among the remaining indigenous forest resources. In the case of pipelines, the most important environmental measure intended to mitigate the damage caused to the flora is the adoption of Indigenous Flora Rescue Programs. This paper is aimed at analyzing the programs currently applied during the implementation of the GASENE project, by conducting a case study. The main targets of such program are obtaining seeds and fruits with a view to subsidize the potential production of sapling to be further employed in the recovery of areas impacted by the pipeline works; and then relocate the most significant samples of species rescued from the suppressed areas in order to comprise forest areas adjacent to the pipeline's right-of-way. The programs had little differences in their methodology while being implemented, however, we consider that up to the present moment the results obtained in the preservation of species of native flora have been satisfactory. (author)

  16. Developing guidelines for economic evaluation of environmental impacts in EIAs. Part I

    International Nuclear Information System (INIS)

    2005-01-01

    Is the time right to introduce environmental evaluation into the Environmental Impact Assessment (EIA) system for large construction projects in China? The report analyses gaps to introducing environmental evaluation into EIAs and recommend how to bridge the gaps. The report also provides suggestions to the State Environmental Protection Administration on core elements of a guideline for environmental evaluation to include in the existing EIA guidelines. The report draws on international and Chinese research and best practice and conducts four case studies of environmental evaluation based on EIAs of investment projects e.g. a power plant, a waste water treatment plant, regional waste water irrigation, and a road construction project

  17. Developing guidelines for economic evaluation of environmental impacts in EIAs. Part I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    Is the time right to introduce environmental evaluation into the Environmental Impact Assessment (EIA) system for large construction projects in China? The report analyses gaps to introducing environmental evaluation into EIAs and recommend how to bridge the gaps. The report also provides suggestions to the State Environmental Protection Administration on core elements of a guideline for environmental evaluation to include in the existing EIA guidelines. The report draws on international and Chinese research and best practice and conducts four case studies of environmental evaluation based on EIAs of investment projects e.g. a power plant, a waste water treatment plant, regional waste water irrigation, and a road construction project.

  18. Law project of program relative to the management of radioactive materials and wastes

    International Nuclear Information System (INIS)

    Villepin, D. de; Breton, T.

    2006-03-01

    The law of the 30 December 1991 defined three axis of researches and fixed a the legal aspects of the researches programs management. Based on these researches results a law project has been defined. The first part of the document presents the objectives of the law project and discusses the different articles. The second part is devoted to the text of the law project. (A.L.B.)

  19. Connecting Marketing and Implementation Research and Library Program Development: A Case Study of the Implementation of [U.S.] National Guidelines and Standards.

    Science.gov (United States)

    Haycock, Ken; Cavill, Pat

    This case study examined: (1) what market research is required for planning for the implementation of "Information Power: Building Partnerships for Learning," the 1998 national guidelines for effective school library media programs; (2) what issues need to be addressed and what target audiences are required to effect change, as well as…

  20. Implementing shared decision making in federally qualified health centers, a quasi-experimental design study: the Office-Guidelines Applied to Practice (Office-GAP) program.

    Science.gov (United States)

    Olomu, Adesuwa; Hart-Davidson, William; Luo, Zhehui; Kelly-Blake, Karen; Holmes-Rovner, Margaret

    2016-08-02

    Use of Shared Decision-Making (SDM) and Decision Aids (DAs) has been encouraged but is not regularly implemented in primary care. The Office-Guidelines Applied to Practice (Office-GAP) intervention is an application of a previous model revised to address guidelines based care for low-income populations with diabetes and coronary heart disease (CHD). To evaluate Office-GAP Program feasibility and preliminary efficacy on medication use, patient satisfaction with physician communication and confidence in decision in low-income population with diabetes and coronary heart disease (CHD) in a Federally Qualified Healthcare Center (FQHC). Ninety-five patients participated in an Office-GAP program. A quasi-experimental design study, over 6 months with 12-month follow-up. Office-GAP program integrates health literacy, communication skills education for patients and physicians, patient/physician decision support tools and SDM into routine care. 1) Implementation rates of planned program elements 2) Patient satisfaction with communication and confidence in decision, and 3) Medication prescription rates. We used the GEE method for hierarchical logistic models, controlling for confounding. Feasibility of the Office-GAP program in the FQHC setting was established. We found significant increase in use of Aspirin/Plavix, statin and beta-blocker during follow-up compared to baseline: Aspirin OR 1.5 (95 % CI: 1.1, 2.2) at 3-months, 1.9 (1.3, 2.9) at 6-months, and 1.8 (1.2, 2.8) at 12-months. Statin OR 1.1 (1.0, 1.3) at 3-months and 1.5 (1.1, 2.2) at 12-months; beta-blocker 1.8 (1.1, 2.9) at 6-months and 12-months. Program elements were consistently used (≥ 98 % clinic attendance at training and tool used). Patient satisfaction with communication and confidence in decision increased. The use of Office-GAP program to teach SDM and use of DAs in real time was demonstrated to be feasible in FQHCs. It has the potential to improve satisfaction with physician communication and

  1. Water Resources Research Grant Program project descriptions, fiscal year 1987

    Science.gov (United States)

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  2. Advanced human-system interface design review guidelines

    International Nuclear Information System (INIS)

    O'Hara, J.M.

    1990-01-01

    Advanced, computer-based, human-system interface designs are emerging in nuclear power plant (NPP) control rooms. These developments may have significant implications for plant safety in that they will greatly affect the ways in which operators interact with systems. At present, however, the only guidance available to the US Nuclear Regulatory Commission (NRC) for the review of control room-operator interfaces, NUREG-0700, was written prior to these technological changes and is thus not designed to address them. The objective of the project reported in this paper is to develop an Advanced Control Room Design Review Guideline for use in performing human factors reviews of advanced operator interfaces. This guideline will be implemented, in part, as a portable, computer-based, interactive document for field use. The paper describes the overall guideline development methodology, the present status of the document, and the plans for further guideline testing and development. 21 refs., 3 figs

  3. Implementing guidelines: Proposed definitions of neuropsychology services in pediatric oncology.

    Science.gov (United States)

    Baum, Katherine T; Powell, Stephanie K; Jacobson, Lisa A; Gragert, Marsha N; Janzen, Laura A; Paltin, Iris; Rey-Casserly, Celiane M; Wilkening, Greta N

    2017-08-01

    Several organizations have published guidelines for the neuropsychological care of survivors of childhood cancer. However, there is limited consensus in how these guidelines are applied. The model of neuropsychology service delivery is further complicated by the variable terminology used to describe recommended services. In an important first step to translate published guidelines into clinical practice, this paper proposes definitions for specific neuropsychological processes and services, with the goal of facilitating consistency across sites to foster future clinical program development and to clarify clinical practice guidelines. © 2017 Wiley Periodicals, Inc.

  4. Guidelines for calculation of atmospheric dispersion and radiological consequences of design basis reactor accidents - Severe accident calculation guidelines, EPR

    International Nuclear Information System (INIS)

    Martens, R.; Schmitz, B.M.; Horn, M.

    1999-01-01

    The activities carried out within the (reduced) project period (1. Sept. until 31. Dec. 1998) for coordinated harmonization between France and Germany, of guidelines for calculation of the radiological consequences of a severe reactor accident, are summarized. (orig./CB) [de

  5. Guidelines for the verification and validation of expert system software and conventional software: Project summary. Volume 1

    International Nuclear Information System (INIS)

    Mirsky, S.M.; Hayes, J.E.; Miller, L.A.

    1995-03-01

    This eight-volume report presents guidelines for performing verification and validation (V ampersand V) on Artificial Intelligence (Al) systems with nuclear applications. The guidelines have much broader application than just expert systems; they are also applicable to object-oriented programming systems, rule-based systems, frame-based systems, model-based systems, neural nets, genetic algorithms, and conventional software systems. This is because many of the components of AI systems are implemented in conventional procedural programming languages, so there is no real distinction. The report examines the state of the art in verifying and validating expert systems. V ampersand V methods traditionally applied to conventional software systems are evaluated for their applicability to expert systems. One hundred fifty-three conventional techniques are identified and evaluated. These methods are found to be useful for at least some of the components of expert systems, frame-based systems, and object-oriented systems. A taxonomy of 52 defect types and their delectability by the 153 methods is presented. With specific regard to expert systems, conventional V ampersand V methods were found to apply well to all the components of the expert system with the exception of the knowledge base. The knowledge base requires extension of the existing methods. Several innovative static verification and validation methods for expert systems have been identified and are described here, including a method for checking the knowledge base open-quotes semanticsclose quotes and a method for generating validation scenarios. Evaluation of some of these methods was performed both analytically and experimentally. A V ampersand V methodology for expert systems is presented based on three factors: (1) a system's judged need for V ampersand V (based in turn on its complexity and degree of required integrity); (2) the life-cycle phase; and (3) the system component being tested

  6. Guidelines for the verification and validation of expert system software and conventional software: Project summary. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Mirsky, S.M.; Hayes, J.E.; Miller, L.A. [Science Applications International Corp., McLean, VA (United States)

    1995-03-01

    This eight-volume report presents guidelines for performing verification and validation (V&V) on Artificial Intelligence (Al) systems with nuclear applications. The guidelines have much broader application than just expert systems; they are also applicable to object-oriented programming systems, rule-based systems, frame-based systems, model-based systems, neural nets, genetic algorithms, and conventional software systems. This is because many of the components of AI systems are implemented in conventional procedural programming languages, so there is no real distinction. The report examines the state of the art in verifying and validating expert systems. V&V methods traditionally applied to conventional software systems are evaluated for their applicability to expert systems. One hundred fifty-three conventional techniques are identified and evaluated. These methods are found to be useful for at least some of the components of expert systems, frame-based systems, and object-oriented systems. A taxonomy of 52 defect types and their delectability by the 153 methods is presented. With specific regard to expert systems, conventional V&V methods were found to apply well to all the components of the expert system with the exception of the knowledge base. The knowledge base requires extension of the existing methods. Several innovative static verification and validation methods for expert systems have been identified and are described here, including a method for checking the knowledge base {open_quotes}semantics{close_quotes} and a method for generating validation scenarios. Evaluation of some of these methods was performed both analytically and experimentally. A V&V methodology for expert systems is presented based on three factors: (1) a system`s judged need for V&V (based in turn on its complexity and degree of required integrity); (2) the life-cycle phase; and (3) the system component being tested.

  7. Evaluation of Nuclear Facility Decommissioning Projects program

    International Nuclear Information System (INIS)

    Baumann, B.L.

    1983-01-01

    The objective of the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program is to provide the NRC licensing staff with data which will allow an assessment of radiation exposure during decommissioning and the implementation of ALARA techniques. The data will also provide information to determine the funding level necessary to ensure timely and safe decommissioning operations. Actual decommissioning costs, methods and radiation exposures are compared with those estimated by the Battelle-PNL and ORNL NUREGs on decommissioning. Exposure reduction techniques applied to decommissioning activities to meet ALARA objectives are described. The lessons learned concerning various decommissioning methods are evaluated

  8. Quality Assurance Program Plan for Project W-379: Spent Nuclear Fuels Canister Storage Building Projec

    International Nuclear Information System (INIS)

    Duncan, D.W.

    1995-01-01

    This document describes the Quality Assurance Program Plan (QAPP) for the Spent Nuclear Fuels (SNF) Canister Storage Building (CSB) Project. The purpose of this QAPP is to control project activities ensuring achievement of the project mission in a safe, consistent and reliable manner

  9. 78 FR 38735 - Autopsy Performance Criteria: Standards, Guidelines and Best Practices

    Science.gov (United States)

    2013-06-27

    ... DEPARTMENT OF JUSTICE Office of Justice Programs [OJP (NIJ) Docket No. 1626] Autopsy Performance Criteria: Standards, Guidelines and Best Practices AGENCY: National Institute of Justice, DOJ. ACTION... entitled, ``Autopsy Performance Criteria: Standards, Guidelines and Best Practices''. The opportunity to...

  10. Effect of a drug allergy educational program and antibiotic prescribing guideline on inpatient clinical providers' antibiotic prescribing knowledge.

    Science.gov (United States)

    Blumenthal, Kimberly G; Shenoy, Erica S; Hurwitz, Shelley; Varughese, Christy A; Hooper, David C; Banerji, Aleena

    2014-01-01

    Inpatient providers have varying levels of knowledge in managing patients with drug and/or penicillin (PCN) allergy. Our objectives were (1) to survey inpatient providers to ascertain their baseline drug allergy knowledge and preparedness in caring for patients with PCN allergy, and (2) to assess the impact of an educational program paired with the implementation of a hospital-based clinical guideline. We electronically surveyed 521 inpatient providers at a tertiary care medical center at baseline and again 6 weeks after an educational initiative paired with clinical guideline implementation. The guideline informed providers on drug allergy history taking and antibiotic prescribing for inpatients with PCN or cephalosporin allergy. Of 323 unique responders, 42% (95% CI, 37-48%) reported no prior education in drug allergy. When considering those who responded to both surveys (n = 213), we observed a significant increase in knowledge about PCN skin testing (35% vs 54%; P allergy over time (54% vs 80%; P allergy was severe significantly improved (77% vs 92%; P = .03). Other areas, including understanding absolute contraindications to receiving a drug again and PCN cross-reactivity with other antimicrobials, did not improve significantly. Inpatient providers have drug allergy knowledge deficits but are interested in tools to help them care for inpatients with drug allergies. Our educational initiative and hospital guideline implementation were associated with increased PCN allergy knowledge in several crucial areas. To improve care of inpatients with drug allergy, more research is needed to evaluate hospital policies and sustainable educational tools. Copyright © 2014 American Academy of Allergy, Asthma & Immunology. Published by Elsevier Inc. All rights reserved.

  11. Development of clinical practice guidelines.

    Science.gov (United States)

    Hollon, Steven D; Areán, Patricia A; Craske, Michelle G; Crawford, Kermit A; Kivlahan, Daniel R; Magnavita, Jeffrey J; Ollendick, Thomas H; Sexton, Thomas L; Spring, Bonnie; Bufka, Lynn F; Galper, Daniel I; Kurtzman, Howard

    2014-01-01

    Clinical practice guidelines (CPGs) are intended to improve mental, behavioral, and physical health by promoting clinical practices that are based on the best available evidence. The American Psychological Association (APA) is committed to generating patient-focused CPGs that are scientifically sound, clinically useful, and informative for psychologists, other health professionals, training programs, policy makers, and the public. The Institute of Medicine (IOM) 2011 standards for generating CPGs represent current best practices in the field. These standards involve multidisciplinary guideline development panels charged with generating recommendations based on comprehensive systematic reviews of the evidence. The IOM standards will guide the APA as it generates CPGs that can be used to inform the general public and the practice community regarding the benefits and harms of various treatment options. CPG recommendations are advisory rather than compulsory. When used appropriately, high-quality guidelines can facilitate shared decision making and identify gaps in knowledge.

  12. Oxytocin augmentation during labor: how to implement medical guidelines into clinical practice.

    Science.gov (United States)

    Holmgren, Stina; Silfver, Kristina Gren; Lind, Cecilia; Nordström, Lennart

    2011-11-01

    To describe an extensive process to implement guidelines for oxytocin use during labor and to report its effects on compliance to clinical practice guidelines after 1 year. A multifaceted strategy was developed to involve all obstetric staff and identify possible local barriers to change in advance. The process lasted for more than 1 year. To describe the implementation of oxytocin use according to the new guidelines, and to compare management in clinical practice with guideline recommendations from audits performed before and after the project. Identification of possible barriers to change, academic detailing, audits with feedback, and local opinion leaders were important factors for a successful process. Documentation of the indication for oxytocin use increased from 54% before, to 86% after the completion of the project (Pcheck list to monitor oxytocin use. However, audits with feedback need to continue for medical safety, and have been planned to take place every 6 months. Copyright © 2011 Elsevier B.V. All rights reserved.

  13. Monitoring and evaluation of Blyth Offshore wind farm: Health and Safety guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, L

    2002-07-01

    Experiences during the construction, operation and maintenance of the wind farm off the coast of Blyth in Northumberland are used to assess the practicality of implementing existing draft British Wind Energy Association (BWEA) guidelines. These best practice guidelines, which were drawn up in consultation with the Health and Safety Executive (HSE) offer advice on health and safety issues specific to the wind industry in the UK. The guidelines are intended to cover both onshore and offshore sites; common advice is followed by advice specific to offshore sites. The Blyth Offshore project, the first offshore wind farm in the UK, features two 2 MW turbines installed on a submerged rocky outcrop about 1 km from the coast in a depth of about 6 m at low tide and a tidal range of about 5 m. The report concluded that, from the experience at Blyth, the draft guidelines will provide a useful tool for those involved in all stages of a wind farm project.

  14. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    International Nuclear Information System (INIS)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented

  15. Integrated Guidelines for Management of Alloy 600 Locations

    Energy Technology Data Exchange (ETDEWEB)

    Na, Kyung-Hwan; Chung, Hansub; Yang, Jun-Seog; Lee, Kyoung-Soo [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The locations experiencing PWSCC include steam generator tubes, pressurizer instrumental nozzles, control rod driving mechanism(CRDM) penetration nozzles, reactor outlet nozzles, and bottom mounted instrumental(BMI) nozzles. Korea Hydro and Nuclear Power Co.(KHNP) has developed integrated guidelines for management of alloy 600 locations and the guidelines are under review by the regulator. The guidelines consist of alloy 600 location database, inspection program, maintenance/preventive maintenance method, and finally water chemistry management for PWSCC mitigation. In this paper, the detailed contents are presented. The integrated guidelines collected all relevant information on the management of alloy 600 locations. This information may be useful for establishing the most effective preventive maintenance strategies by prioritization in addition to maintenance strategies. Table II summarize maintenance strategies for alloy 600 locations.

  16. Research Experience in Psychiatry Residency Programs Across Canada: Current Status

    Science.gov (United States)

    Shanmugalingam, Arany; Ferreria, Sharon G; Norman, Ross M G; Vasudev, Kamini

    2014-01-01

    Objective: To determine the current status of research experience in psychiatry residency programs across Canada. Method: Coordinators of Psychiatric Education (COPE) resident representatives from all 17 psychiatry residency programs in Canada were asked to complete a survey regarding research training requirements in their programs. Results: Among the 17 COPE representatives, 15 completed the survey, representing 88% of the Canadian medical schools that have a psychiatry residency program. Among the 15 programs, 11 (73%) require residents to conduct a scholarly activity to complete residency. Some of these programs incorporated such a requirement in the past 5 years. Ten respondents (67%) reported availability of official policy and (or) guidelines on resident research requirements. Among the 11 programs that have a research requirement, 10 (91%) require residents to complete 1 scholarly activity; 1 requires completion of 2 scholarly activities. Eight (53%) residency programs reported having a separate research track. All of the programs have a research coordinator and 14 (93%) programs provide protected time to residents for conducting research. The 3 most common types of scholarly activities that qualify for the mandatory research requirement are a full independent project (10 programs), a quality improvement project (8 programs), and assisting in a faculty project (8 programs). Six programs expect their residents to present their final work in a departmental forum. None of the residency programs require publication of residents’ final work. Conclusions: The current status of the research experience during psychiatry residency in Canada is encouraging but there is heterogeneity across the programs. PMID:25565474

  17. Clinical practice guidelines in breast cancer

    Science.gov (United States)

    Tyagi, N. Kumar; Dhesy-Thind, S.

    2018-01-01

    Background A number of clinical practice guidelines (cpgs) concerning breast cancer (bca) screening and management are available. Here, we review the strengths and weaknesses of cpgs from various professional organizations and consensus groups with respect to their methodologic quality, recommendations, and implementability. Methods Guidelines from four groups were reviewed with respect to two clinical scenarios: adjuvant ovarian function suppression (ofs) in premenopausal women with early-stage estrogen receptor–positive bca, and use of sentinel lymph node biopsy (slnb) after neoadjuvant chemotherapy (nac) for locally advanced bca. Guidelines from the American Society of Clinical Oncology (asco); Cancer Care Ontario’s Program in Evidence Based Care (cco’s pebc); the U.S. National Comprehensive Cancer Network (nccn); and the St. Gallen International Breast Cancer Consensus Conference were reviewed by two independent assessors. Guideline methodology and applicability were evaluated using the agree ii tool. Results The quality of the cpgs was greatest for the guidelines developed by asco and cco’s pebc. The nccn and St. Gallen guidelines were found to have lower scores for methodologic rigour. All guidelines scored poorly for applicability. The recommendations for ofs were similar in three guidelines. Recommendations by the various organizations for the use of slnb after nac were contradictory. Conclusions Our review demonstrated that cpgs can be heterogeneous in methodologic quality. Low-quality cpg implementation strategies contribute to low uptake of, and adherence to, bca cpgs. Further research examining the barriers to recommendations—such as intrinsic guideline characteristics and the needs of end users—is required. The use of bca cpgs can improve the knowledge-to-practice gap and patient outcomes.

  18. Description of the Karoo Biome project

    CSIR Research Space (South Africa)

    Cowling, RM

    1986-01-01

    Full Text Available The ecological characteristics and ecological problems of the karoo biome are briefly described. A conceptual basis and guidelines for the development of the Karoo Biome Project are outlined by addressing project goals, project structure...

  19. Implementation of Good Clinical Laboratory Practice (GCLP) guidelines within the External Quality Assurance Program Oversight Laboratory (EQAPOL).

    Science.gov (United States)

    Todd, Christopher A; Sanchez, Ana M; Garcia, Ambrosia; Denny, Thomas N; Sarzotti-Kelsoe, Marcella

    2014-07-01

    The EQAPOL contract was awarded to Duke University to develop and manage global proficiency testing programs for flow cytometry-, ELISpot-, and Luminex bead-based assays (cytokine analytes), as well as create a genetically diverse panel of HIV-1 viral cultures to be made available to National Institutes of Health (NIH) researchers. As a part of this contract, EQAPOL was required to operate under Good Clinical Laboratory Practices (GCLP) that are traditionally used for laboratories conducting endpoint assays for human clinical trials. EQAPOL adapted these guidelines to the management of proficiency testing programs while simultaneously incorporating aspects of ISO/IEC 17043 which are specifically designed for external proficiency management. Over the first two years of the contract, the EQAPOL Oversight Laboratories received training, developed standard operating procedures and quality management practices, implemented strict quality control procedures for equipment, reagents, and documentation, and received audits from the EQAPOL Central Quality Assurance Unit. GCLP programs, such as EQAPOL, strengthen a laboratory's ability to perform critical assays and provide quality assessments of future potential vaccines. © 2013.

  20. West Virginia peer exchange : streamlining highway safety improvement program project delivery.

    Science.gov (United States)

    2015-01-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences : for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September : 22 to 23, 2014 in Charleston, We...

  1. Project Healthy Bones: An Osteoporosis Prevention Program for Older Adults.

    Science.gov (United States)

    Klotzbach-Shimomura, Kathleen

    2001-01-01

    Project Healthy Bones is a 24-week exercise and education program for older women and men at risk for or who have osteoporosis. The exercise component is designed to improve strength, balance, and flexibility. The education curriculum stresses the importance of exercise, nutrition, safety, drug therapy, and lifestyle factors. (SK)

  2. 33 CFR 385.13 - Projects implemented under additional program authority.

    Science.gov (United States)

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  3. PREPS2 - a PC-based computer program for performing economic analysis of capital projects

    International Nuclear Information System (INIS)

    Blake, M.W.; Brand, D.O.; Chastain, E.T.; Johnson, E.D.

    1990-01-01

    In these times of increased spending to finance new capacity and to meet clean air act legislation, many electric utilities are giving a high priority to controlling capital expenditures at existing generating facilities. Determining the level of capital expenditures which are economically justified is very difficult; units which have higher capacity factors are worth more to the utility. Therefore, the utility can more readily justify higher capital expenditures to improve or maintain reliability and heat rate than on units with lower capacity factors. This paper describes a PC-based computer program (PREPS2) which performs an economic analysis of individual capital projects. The program incorporates tables which describe the worth to the system of making improvements in each unit. This computer program is currently being used by the six Southern Company operating companies to evaluate all production capital projects over $50,000. Approximately 500 projects representing about $300 million are being analyzed each year

  4. Health physics appraisal guidelines for fusion/confinement devices

    International Nuclear Information System (INIS)

    Neeson, P.M.

    1987-01-01

    Several types of fusion/confinement devices have been developed for a variety of research applications. The health physics considerations for these devices can vary, depending on a number of parameters. This paper presents guidelines for health physics appraisal of such devices, which can be tailored to apply to specific systems. The guidelines can also be useful for establishing ongoing health physics programs for safe operation of the devices

  5. Cooperative Purchasing Guidelines. Background and Research, Pros and Cons, Examples of Exemplary Programs, Sample Forms, and Organization Procedures.

    Science.gov (United States)

    Association of School Business Officials, Chicago, IL.

    Cooperative purchasing programs among school districts have grown rapidly in the past decade, but significant questions remain about the benefits and drawbacks of such programs. This document presents the results of a project sponsored by the Association of School Business Officials for the purpose of addressing these questions. Comprising…

  6. Native flora rescue program: GASENE project case study

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Akahori, Lisa [Telsan, Rio de Janeiro, RJ (Brazil); Jacomelli Junior, Jose Almir [AGF Engenharia, Araucaria, PR (Brazil)

    2009-07-01

    Concerning the surrounding flora, the implementation of pipelines may cause fragmentation and isolation of the remaining natural vegetation, possibly changing the forest structure; thus raising the border effect; modifying the ratio of species and life forms, decreasing the vegetal diversity and/or causing a lack of connectivity among the remaining indigenous forest resources. In the case of pipelines, the most important environmental measure intended to mitigate the damage caused to the flora is the adoption of Indigenous Flora Rescue Programs. This paper is aimed at analyzing the programs currently applied during the implementation of the GASENE project, by conducting a case study. The main targets of such program are obtaining seeds and fruits with a view to subsidize the potential production of sapling to be further employed in the recovery of areas impacted by the pipeline works; and then relocate the most significant samples of species rescued from the suppressed areas in order to comprise forest areas adjacent to the pipeline's right-of-way. The programs had little differences in their methodology while being implemented, however, we consider that up to the present moment the results obtained in the preservation of species of native flora have been satisfactory. (author)

  7. Formalized Combined 2003 European Guidelines on Cardiovascular Disease Prevention and Hypertension

    Czech Academy of Sciences Publication Activity Database

    Peleška, Jan; Anger, Z.; Buchtela, David; Tomečková, Marie; Veselý, Arnošt; Zvárová, Jana

    23 Suppl. 2, - (2005), s. 196 ISSN 0263-6352. [European Meeting on Hypertension /15./. 17.06.2005-21.06.2005, Milan] R&D Projects: GA AV ČR 1ET200300413 Institutional research plan: CEZ:AV0Z10300504 Keywords : European medical guidelines * formalization of combined guidelines Subject RIV: FA - Cardiovascular Disease s incl. Cardiotharic Surgery

  8. Guidelines for prevention in psychology.

    Science.gov (United States)

    2014-04-01

    The effectiveness of prevention to enhance human functioning and reduce psychological distress has been demonstrated. From infancy through adulthood, access to preventive services and interventions is important to improve the quality of life and human functioning and reduce illness and premature death. The importance of prevention is consistent with the Patient Protection and Affordable Care Act of 2010. Even with the increased focus on prevention, psychology training programs rarely require specific courses on prevention. In particular, conceptualizations about best practices in prevention, particularly at the environmental level, are lacking. Therefore, psychologists engaged in prevention can benefit from a set of guidelines that address and inform prevention practices. Accordingly, the Guidelines for Prevention in Psychology are intended to "inform psychologists, the public, and other interested parties regarding desirable professional practices" in prevention. The Prevention Guidelines are recommended based on their potential benefits to the public and the professional practice of psychology. They support prevention as an important area of practice, research, and training for psychologists. The Guidelines give increased attention to prevention within APA, encouraging psychologists to become involved with preventive activities relevant to their area of practice. (PsycINFO Database Record (c) 2014 APA, all rights reserved).

  9. Computerization of guidelines: towards a "guideline markup language".

    Science.gov (United States)

    Dart, T; Xu, Y; Chatellier, G; Degoulet, P

    2001-01-01

    Medical decision making is one of the most difficult daily tasks for physicians. Guidelines have been designed to reduce variance between physicians in daily practice, to improve patient outcomes and to control costs. In fact, few physicians use guidelines in daily practice. A way to ease the use of guidelines is to implement computerised guidelines (computer reminders). We present in this paper a method of computerising guidelines. Our objectives were: 1) to propose a generic model that can be instantiated for any specific guidelines; 2) to use eXtensible Markup Language (XML) as a guideline representation language to instantiate the generic model for a specific guideline. Our model is an object representation of a clinical algorithm, it has been validated by running two different guidelines issued by a French official Agency. In spite of some limitations, we found that this model is expressive enough to represent complex guidelines devoted to diabetes and hypertension management. We conclude that XML can be used as a description format to structure guidelines and as an interface between paper-based guidelines and computer applications.

  10. Academy of Program/Project & Engineering Leadership Orbital Debris Management and Risk Mitigation

    Data.gov (United States)

    National Aeronautics and Space Administration — The NASA Academy of Program/Project & Engineering Leadership (APPEL) is excited to announce the public release of Orbital Debris Management and Risk Mitigation,...

  11. Final report of the UMTRA independent technical review of TAC audit programs

    International Nuclear Information System (INIS)

    1994-10-01

    This report details the findings of an Independent Technical Review (ITR) of practices and procedures for the Uranium Mill Tailings Remedial Action (UMTRA) Project audit program. The audit program is conducted by Jacobs Engineering Group Inc., the Technical Assistance Contractor (TAC) for the UMTRA Project. The purpose of the ITR was to ensure that the TAC audit program is effective and is conducted efficiently. The ITR was conducted from May 16-20, 1994. A review team observed audit practices in the field, reviewed the TAC audit program's documentation, and discussed the program with TAC staff and management. The format of this report has been developed around EPA guidelines; they comprise most of the major section headings. Each section begins by identifying the criteria that the TAC program is measured against, then describing the approach used by the ITR team to measure each TAC audit program against the criteria. An assessment of each type of audit is then summarized for each component in the following order: Radiological audit summary; Health and safety audit summary; Environmental audit summary; Quality assurance audit summary

  12. 77 FR 45378 - Guidelines for Cases Requiring On-Scene Death Investigation

    Science.gov (United States)

    2012-07-31

    ... DEPARTMENT OF JUSTICE Office of Justice Programs [OJP (NIJ) Docket No. 1600] Guidelines for Cases... entitled, ``Guidelines for Cases Requiring On-Scene Death Investigation''. The opportunity to provide comments on this document is open to coroner/medical examiner office representatives, law enforcement...

  13. Guidelines for the undergraduate psychology major: Version 2.0.

    Science.gov (United States)

    2016-01-01

    The APA Guidelines for the Undergraduate Psychology Major: Version 2.0 (henceforth Guidelines 2.0; APA, 2013) represents a national effort to describe and develop high-quality undergraduate programs in psychology. The task force charged with the revision of the original guidelines for the undergraduate major examined the success of the document's implementation and made changes to reflect emerging best practices and to integrate psychology's work with benchmarking scholarship in higher education. Guidelines 2.0 abandoned the original distinction drawn between psychology-focused skills and psychology skills that enhance liberal arts development. Instead, Guidelines 2.0 describes five inclusive goals for the undergraduate psychology major and two developmental levels of student learning outcomes. Suggestions for assessment planning are provided for each of the five learning goals. (c) 2016 APA, all rights reserved).

  14. Guidelines for the verification and validation of expert system software and conventional software. Volume 1: Project summary. Final report

    International Nuclear Information System (INIS)

    Miller, L.A.; Hayes, J.E.; Mirsky, S.M.

    1995-05-01

    This eight-volume report presents guidelines for performing verification and validation (V ampersand V) on Artificial Intelligence (AI) systems with nuclear applications. The guidelines have much broader application than just expert systems; they are also applicable to object-oriented programming systems, rule-based systems, frame-based systems, model-based systems, neural nets, genetic algorithms, and conventional software systems. This is because many of the components of AI systems are implemented in conventional procedural programming languages, so there is no real distinction. The report examines the state of the art in verifying and validating expert systems. V ampersand V methods traditionally applied to conventional software systems are evaluated for their applicability to expert systems. One hundred fifty-three conventional techniques are identified and evaluated. These methods are found to be useful for at least some of the components of expert systems, frame-based systems, and object-oriented systems. A taxonomy of 52 defect types and their delectability by the 153 methods is presented. With specific regard to expert systems, conventional V ampersand V methods were found to apply well to all the components of the expert system with the exception of the knowledge base. The knowledge base requires extension of the existing methods. Several innovative static verification and validation methods for expert systems have been identified and are described here, including a method for checking the knowledge base open-quotes semanticsclose quotes and a method for generating validation scenarios. Evaluation of some of these methods was performed both analytically and experimentally

  15. [HIV prevention program for young people--the WYSH Project as a model of "combination prevention"].

    Science.gov (United States)

    Ono-Kihara, Masako

    2010-03-01

    In face of the HIV pandemic that still grows, unsuccessful efforts of developing biomedical control measures or the failure of cognitive-behavioral approach to show sustained social level effectiveness, behavioral strategy is now expected to evolve into a structural prevention ("combination prevention") that involves multiple behavioral goals and multilevel approaches. WYSH Project is a combination prevention project for youth developed through socio-epidemiological approach that integrates epidemiology with social science such as social marketing and mixed method. WYSH Project includes mass education programs for youth in schools and programs for out-of-school youth through cyber network and peer communication. Started in 2002, it expanded nationwide with supports from related ministries and parent-teacher associations and has grown into a single largest youth prevention project in Japan.

  16. Salt Repository Project Waste Package Program Plan: Draft

    International Nuclear Information System (INIS)

    Carr, J.A.; Cunnane, J.C.

    1986-01-01

    Under the direction of the Office of Civilian Radioactive Waste Management (OCRWM) created within the DOE by direction of the Nuclear Waste Policy Act of 1982 (NWPA), the mission of the Salt Repository Project (SRP) is to provide for the development of a candidate salt repository for disposal of high-level radioactive waste (HLW) and spent reactor fuel in a manner that fully protects the health and safety of the public and the quality of the environment. In consideration of the program needs and requirements discussed above, the SRP has decided to develop and issue this SRP Waste Package Program Plan. This document is intended to outline how the SRP plans to develop the waste package design and to show, with reasonable assurance, that the developed design will satisfy applicable requirements/performance objectives. 44 refs., 16 figs., 16 tabs

  17. Project based education as motivation factor in undergraduate program in Electronics at Copenhagen University College of Engineering

    DEFF Research Database (Denmark)

    Friesel, Anna

    2012-01-01

    This paper summarizes the contents of our experience with project based courses and team work in the undergraduate program in Electronics. The main points of our program are described in this paper, where the leading idea is to combine theory with practical engineering projects. Our students work...

  18. Gas supply for independent power projects: Drilling programs and reserve acquisitions

    International Nuclear Information System (INIS)

    Lambert, J.D.; Walker, R.K.

    1990-01-01

    Developers of gas-fired independent power projects, although drawn to gas as the fuel of choice for economic and environmental reasons, are finding the problem of cost-effective gas supply to be intractable. By one estimate, there are $6 billion worth of gas-fired projects languishing in the planning stage for want of long-term gas supply that is acceptable to project lenders. Worse still, as the authors are aware, some currently operating gas-fired projects lack such a supply, thus forcing the developer to rely on the spot market for gas as an interim (and unsatisfactory) solution. Although spot market prices in the deregulated natural gas industry have remained relatively low over several years, long-term gas supply has become problematic, particularly for power projects whose economics typically require an assured supply at a determined price over a multiyear period. In short, while there is an increasing demand for gas as a preferred source of fuel supply for power projects, there are discontinuities in the approaches taken to contracting for that supply by producers and developers. These concern primarily allocation of the risk of commodity-driven price increases during the term of the fuel supply contract. Without a means of accommodating price-related risk, the parties will inevitably find themselves at an impasse in contract negotiations. If there is a barrier to the independent power generation industry's vertical integration into gas production, it is the fundamental insularity of the two industries. As they have discovered, it may be indispensable for gas producers and power developers to employ intermediaries familiar with both industries in order to consummate appropriate joint-venture drilling programs and reserve acquisitions. Given the economic consequences of doing so successfully, however, they believe such programs and acquisitions may become an integral part of independent power developers' business strategy in the 1990s and beyond

  19. Field Programmable Gate Array Failure Rate Estimation Guidelines for Launch Vehicle Fault Tree Models

    Science.gov (United States)

    Al Hassan, Mohammad; Novack, Steven D.; Hatfield, Glen S.; Britton, Paul

    2017-01-01

    Today's launch vehicles complex electronic and avionic systems heavily utilize the Field Programmable Gate Array (FPGA) integrated circuit (IC). FPGAs are prevalent ICs in communication protocols such as MIL-STD-1553B, and in control signal commands such as in solenoid/servo valves actuations. This paper will demonstrate guidelines to estimate FPGA failure rates for a launch vehicle, the guidelines will account for hardware, firmware, and radiation induced failures. The hardware contribution of the approach accounts for physical failures of the IC, FPGA memory and clock. The firmware portion will provide guidelines on the high level FPGA programming language and ways to account for software/code reliability growth. The radiation portion will provide guidelines on environment susceptibility as well as guidelines on tailoring other launch vehicle programs historical data to a specific launch vehicle.

  20. Assessment report of research and development activities in FY2006 activity. 'Fast reactor cycle technology development project' (Interim report)

    International Nuclear Information System (INIS)

    2007-08-01

    Japan Atomic Energy Agency (hereinafter referred to as 'JAEA') asked the advisory committee 'evaluation Committee of Research and Development (R and D) Activities for Advanced Nuclear System/Nuclear Fuel Cycle Technology' (hereinafter referred to as 'Committee') to assess the interim report on Fast Reactor Cycle Technology Development Project ' (former 'Feasibility Study on Commercialized Fast Reactor Cycle Systems') in FY2006, in accordance with 'General Guideline for the Evaluation of Government R and D Activities' by Japanese Cabinet Office, 'Guideline for Evaluation of R and D in Ministry of Education, Culture Sports, Science and Technology' and 'Regulation on Conduct for Evaluation of R and D Activities' by JAEA. In response to JAEA's request, the Committee assessed the R and D program over five years, the criteria for adoption judgment on innovative technologies at the end of 2010 (Project Review), and the organization structure for R and D. etc. (Management Review). As a result of review, the Committee concluded that this R and D program and its organization structure are almost reasonable. (author)