WorldWideScience

Sample records for projects environmental impact

  1. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  2. Discussion on the post-project assessment of environmental impact for nuclear facilities

    International Nuclear Information System (INIS)

    Shang Zhaorong

    2013-01-01

    The paper introduces the background of post-project assessment of environmental impact in the world and focuses on the characteristic of environmental impact assessment for Chinese nuclear facilities construction projects, analyzes the necessity, principle and contents of post-project assessment of environmental impact on current Chinese nuclear facilities operation. It is considered that to start the post-project assessment of environmental impact, perfect the post-project assessment mechanism, introduce the post-project assessment into environmental impact assessment system are just at the night time. (author)

  3. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  4. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  5. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  6. Environmental Impact Assessment of a Water Transfer Project

    Directory of Open Access Journals (Sweden)

    Pazoki

    2015-07-01

    Full Text Available Background Reliable water supplies for drinking and agriculture are some of the objectives for the sustainable development of every country. However, constructed facilities such as dams and irrigation networks and drainage can exert positive and negative effects directly or indirectly on the environment. The environmental impact assessment is a method for identifying the positive and negative effects caused by a plan and suggests performance management best practices aimed at lessening the negative impacts and augmenting the positive ones. Objectives The present study sought to evaluate the environmental impacts of the water transfer project of the Jooban Dam in two phases of preparation and operation. Materials and Methods A checklist containing the positive, negative, short-term, and long-term effects as well as the continuation and probable occurrence of these effects was used. Results The results showed that the negative environmental and social impacts of the project outweighed the positive impacts in terms of type, number, and intensity. Conclusions Unless there are well-thought out strategies for minimizing the undesirable impact on the environment, it is not advisable that such projects be permitted.

  7. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  8. Some environmental impacts associated with project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    1976-01-01

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kiloton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. Based on overall results it appears important to give adequate attention to environmental effects resulting from nuclear fracturing experiments

  9. Environmental impacts associated with Project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. Radiation and ground motion are unique to this type experiment while conventional activities would be associated with any type of resource development. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. (U.S.)

  10. Environmental impact assessments of the Three Gorges Project in China: Issues and interventions

    Science.gov (United States)

    Xu, Xibao; Tan, Yan; Yang, Guishan

    2013-09-01

    The paper takes China's authoritative Environmental Impact Statement for the Yangzi (Yangtze) Three Gorges Project (TGP) in 1992 as a benchmark against which to evaluate emerging major environmental outcomes since the initial impoundment of the Three Gorges reservoir in 2003. The paper particularly examines five crucial environmental aspects and associated causal factors. The five domains include human resettlement and the carrying capacity of local environments (especially land), water quality, reservoir sedimentation and downstream riverbed erosion, soil erosion, and seismic activity and geological hazards. Lessons from the environmental impact assessments of the TGP are: (1) hydro project planning needs to take place at a broader scale, and a strategic environmental assessment at a broader scale is necessary in advance of individual environmental impact assessments; (2) national policy and planning adjustments need to react quickly to the impact changes of large projects; (3) long-term environmental monitoring systems and joint operations with other large projects in the upstream areas of a river basin should be established, and the cross-impacts of climate change on projects and possible impacts of projects on regional or local climate considered.

  11. 78 FR 13082 - Draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement...

    Science.gov (United States)

    2013-02-26

    ...The Bureau of Reclamation has made available for public review and comment the draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The California Tahoe Conservancy and the Tahoe Regional Planning Agency, the other lead agencies for the Project, made the EIR/EIS/EIS available to the public on February 8, 2013.

  12. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  13. Stuart oil shale project stage two: executive summary: draft environmental impact statement

    International Nuclear Information System (INIS)

    1999-09-01

    The project is an oil shale open pit mine and processing operation that is currently being commissioned 15 km north of Gladstone, Queensland, Australia, and is owned as a joint venture by Southern Pacific Petroleum N.L., Central Pacific Minerals N.L, and Suncor Energy Inc., a leading Canadian company that is an integrated energy company. The results of a comprehensive investigation are included of the potential environmental impacts of the project, and which are described in the Draft Environmental Impact Statement (EIS). In stage two, there is included the existing mine expansion as well as the construction of an additional process plant based around a larger commercial scale ATP oil shale processing plant. The new stage two operation will be developed next to and integral with services and infrastructure provided for stage one. Described are: the assessment process, regulatory framework and the project area, the needs for an alternative to the project, the proposal itself, the existing natural, social and economic impacts, and the environmental impacts as well as plans for their mitigation. In appendices there are included a draft environmental management overview strategy and an environmental management plan. The elements covered in the report by section are: background, need for the project, the proponent, legislation and approvals, project description, environmental issues and impact management

  14. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  15. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  16. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  17. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  18. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  19. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  20. A comparative study on the Environmental Impact Assessment of industrial projects in Malaysia

    Science.gov (United States)

    Marmaya, E. A.; Mahbub, R.

    2018-02-01

    In the past decade, mankind has been manipulating the natural environment to better suit its needs for providing buildings and infrastructure for residential, commercial, business and industrial purposes. The rapid industrialization that has taken place has generated several issues regarding the environment. Therefore, managing environmental risks in construction projects has been recognized as an important process to achieve the project objectives in terms of time, cost, quality, safety and environmental sustainability. The aim of this research is to assess the environmental impact of industrial projects to the surrounding areas. The impact to the environment can be categorized into several aspects such as ecosystem impact, natural resources impact and public impact. This research employs the quantitative approach, that is, a questionnaire survey targeted at the occupants living in the surrounding areas of the case study location, namely the industrial sites in Sabah Ammonia Urea (SAMUR), Sipitang, Sabah and Lynas Advanced Materials Plant (LAMP), Gebeng Pahang. The findings of the research show that the two projects are perceived to have negative environmental impact especially for land pollution and green-house gas emissions.

  1. Environmental impact assessment for the Nova projects (Building 391 complex)

    International Nuclear Information System (INIS)

    Odell, B.N.

    1979-01-01

    The environmental impact assessment of the Nova projects (Building 391 Complex) describes (1) the proposed actions, (2) the existing environment in and around the Livermore Valley, and (3) the potential environmental impacts from the construction and operation of these facilities. It shows that the proposed action does not conflict with any Federal, State, Regional, or Local Plans and Programs. Possible alternatives to the proposed action are discussed. However, it is concluded that the proposed actions were the most reasonable of the alternatives and would involve relatively minor adverse environmental impacts

  2. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  3. Environmental impact assessments of wind energy projects: An Alberta example

    International Nuclear Information System (INIS)

    Brown, W.K.

    1993-01-01

    A description is presented of the environmental impact assessment for an Alberta windfarm, summarizing the rationale, process and results of the assessment, costs involved, and recommendations made. The Pe-kun-nee windfarm was designed as a 44 turbine, 9.9 kW windfarm. The assessment included consideration of the complete range of environmental impacts of the windfarm, including reviews of impacts associated with similar developments elsewhere. From an environmental perspective, the proposed site and transmission line route were exceedingly suitable for development. No major potential impacts were identified. Most impacts that could occur, including terrain and vegetation disturbance, were associated with the construction phase of the project. A series of mitigation measures were developed to minimize each identified impact. Monitoring during the operations phase of the development was recommended to: ensure that the revegetation of disturbed areas was adequate; verify the sound level model; and document the incidence of bird strikes. Potential aesthetic impacts were addressed through a proposed interpretive project designed to educate visitors, enhance the profile of the wind-energy industry, and provide local employment. The assessment was completed within 8 months of initiation at a cost less than $200,000

  4. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  5. Environmental impact assessment for uranium mine, mill and in situ leach projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries. 1 fig., 5 tabs.

  6. Environmental impact assessment for uranium mine, mill and in situ leach projects

    International Nuclear Information System (INIS)

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries

  7. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  8. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    OpenAIRE

    Mohamed Marzouk; Mohamed El-zayat; Ahmed Aboushady

    2017-01-01

    Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG) footprint, eutrophication potential (EP), acidification potential (AP), human health (HH) particulate, ozone depletion, and smog. Each of these environmenta...

  9. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  10. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  11. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  12. Economic evaluation of environmental impacts of open cast mining project - an approach

    International Nuclear Information System (INIS)

    Maiti, S.K.; Pathak, K.

    1998-01-01

    Economic valuation of environmental attributes are pragmatic approach to evaluating the impacts and it helps decision makers to arrive at objective decisions on the basis of cost benefit ratio. For determining the physical impact and its quantification, four evaluation methods, namely-market price method, surrogate market price, survey based and cost based approaches are generally used. The present paper reviews the importance of environmental evaluation of impacts of mining and also reviews a few suitable methodologies that could be effectively used for economic evaluation of environmental impacts in open cast mining projects. (author)

  13. Radioactive environmental impact assessment for a highway construction project in Guangdong province

    International Nuclear Information System (INIS)

    Qiu Guohua

    2009-01-01

    Based on the field environmental investigation and monitoring result, the radioactive environmental impact for a highway construction project in Guangdong province has been analyzed and assessed and forecacted. (authors)

  14. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  15. Final environmental impact statement Kenetech/PacifiCorp Windpower Project Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-08-01

    The Draft and Final Environmental Impact Statements (DEIS and FEIS) assess the environmental consequences of a proposed windpower energy development in Carbon County, Wyoming. This abbreviated FEIS revises and supplements the DEIS for the project and addresses comments expressed for the DEIS. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  16. Draft environmental impact statement: KENETECH/PacifiCorp Windpower Project, Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-01-01

    This Draft Environmental Impact Statement assesses the environmental consequences of a proposed windpower development project in Carbon County, between Arlington and Hanna, Wyoming. Public scoping commenced in January 1994. All issues raised during scoping and interdisciplinary team preparation of the analysis are addressed. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts resulting from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  17. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  18. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  19. Impacts and environmental administration in development projects: instruments for the political fixation

    International Nuclear Information System (INIS)

    Angel Sanint, Enrique

    1999-01-01

    Inside the scheme of the necessary environmental administration to evaluate, to mitigate, to correct and to compensate the environmental impacts of a development project the acting diagram is presented, belonging to the multi-objective analysis, like an interesting tool that contributes to consider restrictions and to keep in mind the economic aspect inside the process of politics fixation for the interaction between the environmental authority and the developers of projects in the three basic instances contemplated by the legislation like interaction points

  20. Foundation stones for a real socio-environmental integration in projects' impact assessments

    Science.gov (United States)

    Andres Dominguez-Gomez, J.

    2015-04-01

    In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA), have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it a parallel progress in addressing their main shortcomings: insufficient integration of environmental and social features into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their diagnosis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmental and economic) of schemes which impact on the environment, and in consequence, to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argue that, in a sociological context of growing complexity, four foundation-stones are required to underpin research methodologies (for both diagnosis and assessment) in the socio-environmental risks of development projects: a theoretical foundation in actor-network theory; an ethical grounding in values which are internationally recognized though not always carried through into practice; a (new) epistemological-scientific base; and a methodological foundation in social participation.

  1. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  2. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  3. 76 FR 75554 - Notice of Availability of the Draft Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...

  4. 77 FR 62256 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-12

    ... of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NE AGENCY... prepared a Final Environmental Impact Statement (EIS) for the Mount Hope Project and by this notice is... Register. ADDRESSES: Copies of the Mount Hope Project Final EIS are available at the Battle Mountain...

  5. The impacts of the 1995 financial institution environmental guidelines on power projects

    International Nuclear Information System (INIS)

    Weaver, K.L.; Schott, G.A.

    1996-01-01

    In 1995, two of the most influential international financial institutions, The World Bank and The US Export-Import Bank (Ex-Im Bank) issued new environmental guidelines. These guidelines, particularly the World Bank guidelines, are used as a benchmark for evaluating the environmental acceptability of a project by many financial institutions, project developers, private investors, the public, and many developing countries. The impact of these guidelines must be well understood by developers of power projects in order to obtain the necessary financing, in addition to attracting investors, and obtaining national approvals and general public acceptance

  6. Application of environmental impact assessment in Spain (1989-2008): the case of Road Projects

    International Nuclear Information System (INIS)

    Barbero Rodriguez, J.; Espigares Pinilla, T.

    2010-01-01

    In this study we analyze the application in Spain of the Environmental Impact Assessment (EIA) along the first 20 years since its implementation, paying special attention to road projects. We revised all Environmental Impact Statement (EISs) published during the period 1989-2008 and monitored, among others, the following variables; the record of decision (favorable or unfavorable) of the State Authority, the type of ecosystem affected by the projects and the mitigation measures required to the developer to implement the project. The results allow us to evaluate the effectiveness of EIA procedure for road projects and to suggest some practical recommendations to improve the quality of EISs. (Author) 13 refs.

  7. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  8. Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1993-09-01

    Public concern regarding the potential human health and environmental effects from uranium mill tailings led Congress to pass the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Public Law 95-604) in 1978. In the UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings at 24 abandoned uranium mill processing sites needing remedial action. Uranium processing activities at most of the 24 mill processing sites resulted in the formation of contaminated ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of hazardous constituents such as uranium and nitrate. The purpose of the Ground Water Project is to protect human health and the environment by meeting EPA-proposed standards in areas where ground water has been contaminated with constituents from UMTRA Project sites. A major first step in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). This document analyzes potential impacts of the alternatives, including the proposed action. These alternatives are programmatic in that they are plans for conducting the UMTRA Ground Water Project. The alternatives do not address site-specific ground water compliance. This PEIS is a planning document that will provide a framework for conducting the Ground Water Project; assess the potential programmatic and environmental impacts of conducting the UMTRA Ground Water Project; provide a method for determining the site-specific ground water compliance strategies; and provide data and information that can be used to prepare site-specific environmental impacts analyses documents more efficiently

  9. Radioactive environmental impact assessment for a production project of titanium dioxide by chlorination process

    International Nuclear Information System (INIS)

    Qiu Guohua

    2010-01-01

    Based on the analysis of shifting direction of radionuclide in production process and the environmental investigation and monitoring, the radioactive environmental impact from a production project of titanium dioxide by chlorination process has been analyzed and assessed. The result of radioactive environmental investigation shows that values of assessment factors are in the range of environmental radioactive background. The radioactive environmental sensitive spot has been delineated. The results of radioactive environmental prediction show that the additional doses to workers and residents are 0.59 mSv/a and 9.28 × 10-4 mSv/a respectively which are less than the annual dose limits of administration. The radioactive environmental impact of the production project of the titanium dioxide by chlorination process will meet the needs of national regulations and standards if radiation protection and environmental protection measures are implemented and radioactive environmental monitoring are strengthened. (author)

  10. Environmental Impact Assessment Process for Oil, Gas and Mining Projects in Nigeria: A Critical Analysis

    Directory of Open Access Journals (Sweden)

    Allan Ingelson and Chilenye Nwapi

    2014-06-01

    Full Text Available Oil and gas development projects are well known to have damaging environmental effects, and that is especially true in the Niger Delta region. Since the enactment of the Environmental Impact Assessment Act in Nigeria in 1992, there has been a general perception that EIAs are seldom carried out in the region. This article presents a critical analysis of legislation and practice concerning the environmental impact assessment (EIA process for oil and gas projects in Nigeria, the world’s twelfth largest producer of crude oil. It discusses a range of reasons why the impacts of oil and gas projects are not being managed well, despite the legal requirements for EIAs. A review of Nigeria’s environmental governance is presented along with a comprehensive discussion of the EIA process and its significant deficiencies. We argue that the EIA system for oil and gas projects in Nigeria reflects tokenism, resulting in the concentration of benefits of developments in big corporations and government officials. The EIA process in Nigeria faces many challenges that must be addressed in order to improve its effectiveness and alleviate the environmental burdens on this rich oil-producing region.

  11. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of the UMTRA Ground Water Project is to protect human health and the environment by meeting the proposed EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own unique set of potential impacts, could be used to implement all the alternatives except the no action alternative. Implementing a PEIS alternative means applying a ground water compliance strategy or strategies at a specific site. It is the use of a strategy or a combination of strategies that would result in site-specific impacts

  12. Environmental impact report (draft)

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  13. Nuclear facility projects in Finland: quality of environmental impact assessment (EIA) processes

    International Nuclear Information System (INIS)

    Vaatainen, A.

    2001-01-01

    In Finland, three public EIA hearings arranged by the contact authority concerning nuclear facilities were organised in 1999: the EIAs of two reactors planned to be constructed in Eurajoki (Olkiluoto) and in Loviisa, and the EIA of a final disposal facility of spent nuclear fuel, to be situated either in Olkiluoto, Loviisa, Romuvaara or Kivetty. Additionally, an application for a decision-in-principle concerning a final disposal facility to be constructed in Olkiluoto was submitted. The Ministry of Trade and Industry is the contact authority in all nuclear projects in Finland. Probably due to the simultaneity of the processes and the great importance of nuclear facility projects to the whole of society, the public opinions did not include only views about environmental impacts of each project, but also opposing and overall views about the use of nuclear energy and its safety. As for the final disposal project, alternative methods were introduced and opposition to the project itself was expressed instead of or in addition to the environmental impacts. (author)

  14. 78 FR 48713 - Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in...

    Science.gov (United States)

    2013-08-09

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...

  15. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  16. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  17. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  18. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts

  19. Methodologies of environmental impact assessment

    International Nuclear Information System (INIS)

    Schroll, H.

    1994-01-01

    This article gives a brief introduction covering the objectives of environmental impact assessment (EIA) and sustainable development, before going on to describe the screening procedure to define the environmental and socio-economic impacts of projects. The EIA procedure outlined encompasses a description of the project, examination of all environmental effects (scoping), identification of existing and predicted environmental conditions and impacts, alternative measures and mitigating measures, co-ordination, with environmental regulations, public participation, and monitoring and approval of the EIA. (UK)

  20. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  1. Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    1998-01-01

    The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation

  2. Environmental Impacts of the Production and Application of Biochar - EuroChar Project

    Science.gov (United States)

    Rack, Mireille; Woods, Jeremy

    2014-05-01

    One of the potential benefits of biochar is carbon sequestration. To determine the overall net sequestration potential it is important to analyse the full supply chain, assessing both the direct and indirect emissions associated with the production and application of biochar. However, it is essential to also incorporate additional environmental impact categories to ensure the assessment of a more complete environmental impact profile. This paper uses a full life-cycle assessment (LCA) methodology to evaluate the results from the EuroChar, 'biochar for carbon sequestration and large-scale removal of GHG from the atmosphere', project. This EU Seventh Framework Programme project aims to investigate and reduce uncertainties around the impacts of, and opportunities for, biochar, and in particular explore possible pathways for its introduction into modern agricultural systems in Europe. The LCA methodology, according to the ISO standards, is applied to the project-specific supply chains to analyse the environmental impacts of biochar production and application. Two conversion technologies for the production of biochar are assessed, gasification and hydrothermal carbonization (HTC), in order to provide conversion efficiencies and emission factors for the biochar production component of the supply chain. The selected feedstocks include those derived from waste residues and dedicated crops. For the end use stage, various forms and methods for biochar application are considered. In addition to the Global Warming Potential category, other environmental impact categories are also included in the analysis. The resulting 'feedstock * conversion technology' matrix provides nine pathways for the production and application of biochar, which are applied as a representative basis for the scenario modelling. These scenarios have been developed in order to assess the feedstock and land availability in Europe for the production and application of biochar and to give an order of

  3. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Science.gov (United States)

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  4. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) is responsible for performing remedial action to bring surface and ground water contaminant levels at 24 inactive uranium processing sites into compliance with the US Environmental Protection Agency (EPA) standards. DOE is accomplishing this through the Uranium Mill Tailings Remedial Action (UMTRA) Surface and Ground Water Projects. Remedial action will be conducted with the concurrence of the US Nuclear Regulatory Commission (NRC) and the full participation of affected states and Indian tribes. Uranium processing activities at most of 24 the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as uranium and nitrate. The purpose of the UMTRA Ground Water Project is to eliminate, or reduce to acceptable levels, the potential health and the environmental consequences of milling activities by meeting the EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance strategies. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently

  5. 76 FR 55155 - Final Environmental Impact Statement for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ... border of the U.S. and Canada for the transport of crude oil across the U.S./Canada international... proposed Project that is designed to transport crude oil produced from oil sands in the Western Canadian... security; environmental, cultural, and economic impacts. Before making a decision on the proposed Project...

  6. 76 FR 381 - Notice of Availability of the Draft Environmental Impact Statement/Draft Environmental Impact...

    Science.gov (United States)

    2011-01-04

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Draft Environmental Impact Statement (EIS), and Draft Environmental Impact Report (EIR) as a joint environmental analysis document for the Iberdrola Renewable/Pacific Wind Development Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the opening of the comment period on the Draft EIS/EIR.

  7. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  8. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  9. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  10. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  11. 77 FR 38823 - Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement...

    Science.gov (United States)

    2012-06-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.FX0000, LVRWB11B4520] Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement/Environmental Impact Report and Proposed California Desert Conservation Area Plan Amendment, Kern County, CA...

  12. Energy projects in Iceland – Advancing the case for the use of economic valuation techniques to evaluate environmental impacts

    International Nuclear Information System (INIS)

    Cook, David; Davíðsdóttir, Brynhildur; Kristófersson, Daði Már

    2016-01-01

    Decision-making in Iceland has occurred without reference to economic valuations of the environmental impacts of energy projects. Environmental Impact Assessments, a legal requirement for nearly all energy projects in Iceland since 1994, have played an important role in identifying the environmental impacts of energy projects, and proposing mitigation measures. However, a purely qualitative description of environmental impacts is insufficient to ensure that they are accounted for equivalently with all of the other costs and benefits of a proposed project. Instead, as monetary information concerning the welfare gains or losses of proposed projects is not currently required to be provided to the licensing body, Orkustofnun, there is the potential for sub-optimal decision-making to occur. As this paper sets out, a broad variety of non-market valuation techniques already exist and could be applied to estimate the value of environmental benefits sacrificed to accommodate such developments. These methods and their outcomes could be incorporated within mandatory cost-benefit assessments for proposed Icelandic energy projects, communicating an estimate of the full welfare implications of approvals to decision-makers and the public alike, and fulfilling an OECD demand for the country to commence such processes. - Highlights: •Current risk of sub-optimal decision-making by licensing body, Orkustofnun. •OECD call for monetary valuations of environmental impacts linked to Icelandic energy projects. •Lessons to be learned from US regulatory approach to advance cost-benefit assessment practice in Iceland. •Practice of conducting non-market valuation techniques limited in Iceland, but now growing.

  13. Valuation of the environmental impacts of the Kayraktepe dam/hydroelectric project, Turkey: An exercise in contingent valuation

    International Nuclear Information System (INIS)

    Biro, Y.E.K.

    1998-01-01

    This paper describes and evaluates the environmental impacts of the Kayraktepe Dam and Hydroelectric Power Plant in Turkey. The contingent valuation method is used to estimate the project's local environmental costs. The average local rural annual willingness to pay for the restoration of the environmental impacts of the project is found to be USD 300 person -1 . Loss of forestry and agricultural benefits from the reservoir area that will be inundated are estimated to be USD 12.66 mill. yr -1 . When the Kayraktepe Project's external costs are internalized, its benefit cost ratio falls from 1.35 to 0.84, indicating that the project is economically undesirable and the decision for its construction needs to be reconsidered 26 refs, 1 fig, 5 tabs

  14. Environmental impacts of Ghazi Barotha hydropower project on river Indus and surrounding areas

    International Nuclear Information System (INIS)

    Soomro, G.A.; Sufi, A.B.

    2005-01-01

    WAPDA being an esteemed organization of the country is involved in development of Water and Power Sector Projects. Ghazi Barotha Hydropower Project is another huge hydropower generation project in the country after Tarbela. The barrage to feed power channel of Ghazi Barotha Power Station are built over River Indus 7 Km down of Tarbela Dam. The project has been constructed to utilize the hydraulic head for power generation that is available between the tailrace of Tarbela Dam and the confluence of Haro River. In this reach river Indus drops by 76 m in distance of 63 Km. This is solely a power generation project with an installed capacity of 1450 MW. The purpose of this paper is to assess the negative impacts on the River Indus due to the construction of GBHP as Water of river Indus will be diverted to the power channel and the river Indus flows go to its lowest in low flow season. The reduction in river flow may change the ecology of the river - belas and people dependant on river water. In this context a study was made to keep the negative environmental impacts as low as possible and suggest mitigation measures to reduce negative impacts and provide enhancement measure to compensate the losses to be sustained by the area people and maintain the social life along with the ecology of the area less disturbed. The study demonstrated that the project is technically sound, economically viable and has limited environmental and social impacts on the area overall and specific the belas and people dependant on the Indus Water from Tarbela downstream up to confluence of Kabul River. (author)

  15. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  16. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  17. The quality of Portuguese Environmental Impact Studies: The case of small hydropower projects

    International Nuclear Information System (INIS)

    Pinho, Paulo; Maia, Rodrigo; Monterroso, Ana

    2007-01-01

    In most Environmental Impact Assessment (EIA) systems environmental authorities can stop an EIA process by refusing the respective EIA Report, on the grounds of technical or methodological insufficiencies identified in the review procedure. However, often times, it cannot be taken for granted that, once an EIA Report is formally accepted, as part of an EIA process, its quality standard is, consistently, of a satisfactory level. This paper summarises the results of a one-year research project aimed at assessing the quality of EIA studies carried out for small hydropower plants in Portugal. An extensive survey was carried out to analyse all EIA Reports that were the basis of successful EIA processes involving this kind of small scale projects, under the old and the new national EIA legislation, that is, over the last two decades. Often times unnoticeable to the general public and the media, located in isolated areas upstream secondary rivers, these projects are likely to generate some significant environmental impacts, in particular on the aesthetics value and character of local landscapes and on pristine ecological habitats. And yet, they are usually regarded as environmental friendly projects designed to produce emission free energy. The design of the evaluation criteria benefited from the literature review on similar research projects carried out in other EU countries. The evaluation exercise revealed a number of technical and methodological weaknesses in a significant percentage of cases. A set of simple and clear cut recommendations is proposed twofold: to improve the current standard of EIA practice and to strengthen the role of the so called EIA Commissions, at the crucial review stage of the EIA process

  18. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  19. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  20. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  1. Beverley project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-07-01

    The Beverley deposit is located on the northern Lake Frome Plains, South Australia, 520km north of Adelaide. It is proposed to mine the deposit by in-situ leaching and to process the solution on the surface to produce an estimated 11,600t of yellowcake from about 6 million tonnes of 0.27% ore over approximately 23 years. The draft environmental impact statement is intended to cover all stages of the development from the pilot plant to final rehabilitation. Sections include the existing environment (geology, climate and meteorology, soils, hydrology, ecology, radionuclide base levels, land use, population and sites of Aboriginal and archaeological significance), the proposed development (solution mining, waste management, water management and mining and processing options), rehabilitation, environmental impact and environmental management and monitoring

  2. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities by meeting Environmental Protection Agency (EPA) ground water standards. One of the first steps in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). The EPA standards allow the use of different strategies for achieving compliance with the standards. This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. Each of the four alternatives evaluated in the PEIS is based on a different mix of strategies to meet EPA ground water standards. The PEIS is intended to serve as a programmatic planning document that provides an objective basis for determining site-specific ground water compliance strategies and data and information that can be used to prepare site-specific environmental impact analyses more efficiently. DOE will prepare appropriate further National Environmental Policy Act documentation before making site-specific decisions to implement the Ground Water Project. Affected States, Tribes, local government agencies, and members of the public have been involved in the process of preparing this PEIS; DOE encourages their continued participation in the site-specific decision making process

  3. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  4. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  5. Environmental impact assessment screening tool

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    An environmental assessment and impact planning software, SCREENER, was tested at a pilot project at the Cameco site (Port Hope). SCREENER was used to screen the impacts of a new construction project in accordance with the process and reporting requirements laid out in the Canadian Environmental Assessment Act. The software test concentrated on the activities that are directly involved with the structure construction and site preparation activities. In addition, a two and one half day training course was given to three AECB staff using the test case as a hands on example. The conclusion of this project is that an automated tool such as SCREENER (or Calyx, the new generation of environmental assessment tools from ESSA Software Ltd.), will help the AECB to standardize the approach to environmental assessment, assist in project planning, and save resources in the screening process. The new approach could allow to allocate AECB limited resources to the detailed assessments required for maximum impact activities. 2 figs. 7 refs.

  6. Environmental impact assessment screening tool

    International Nuclear Information System (INIS)

    1995-05-01

    An environmental assessment and impact planning software, SCREENER, was tested at a pilot project at the Cameco site (Port Hope). SCREENER was used to screen the impacts of a new construction project in accordance with the process and reporting requirements laid out in the Canadian Environmental Assessment Act. The software test concentrated on the activities that are directly involved with the structure construction and site preparation activities. In addition, a two and one half day training course was given to three AECB staff using the test case as a hands on example. The conclusion of this project is that an automated tool such as SCREENER (or Calyx, the new generation of environmental assessment tools from ESSA Software Ltd.), will help the AECB to standardize the approach to environmental assessment, assist in project planning, and save resources in the screening process. The new approach could allow to allocate AECB limited resources to the detailed assessments required for maximum impact activities

  7. Environmental impact assessment on the radioactive of a REE separation project

    International Nuclear Information System (INIS)

    Li Nana; Zhu Yucheng; Cai Minqi

    2011-01-01

    Based on the investigation of field actual environment and analysis of radioactive sources, and industrial process techniques, environmental impact of the radioactive from a REE separation project has been analyzed, assessed and forecasted. The investigation and monitoring of actual radioactive in the environment indicated that value of assessment factors remained within the range of natural background level as a whole. The maximum annual individual effective dose for occupational worker and the public were forecasted and were found to be 1.622 mSv/a and 0.029 mSv/a respectively. Both of the values are lower than annual dose limit respectively. The radioactive impact of this project on the environment will comply with the standard limit of law and requirements after the reservation measures are carried out to REE. (authors)

  8. Environmental impact evaluation from large energy projects; Avaliacao de impacto ambiental de grandes projetos energeticos

    Energy Technology Data Exchange (ETDEWEB)

    Uribe, Alberto [Bahia Univ., Salvador, BA (Brazil)

    1985-12-31

    This paper builds up theoretical framework and methodological approaches to assess environmental impacts from large energy projects. It aims towards the definition of concrete tools, and technical proceedings to allow identification and quantification (or weighing) of effects on the natural and social environment. The environmental impacts assessment, (EIA), studies are described as important instruments in planning and in the choice of alternative energy policies. (author). 15 refs., 2 figs

  9. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  10. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Science.gov (United States)

    2011-10-24

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the availability of the Final EIS/EIR. By this Notice the BLM is also segregating the public lands within the Tule Project application area from appropriation under the public land laws including the Mining Law, but not the Mineral Leasing or Material Sales Act, for a period of 2 years.

  11. 77 FR 59875 - Environmental Impact and Related Procedures

    Science.gov (United States)

    2012-10-01

    ... repair project that do not typically involve significant environmental impacts. Specifically, the FHWA... damaged facility to address concerns such as safety and environmental impacts. The agencies also seek... kinds of projects and activities described in this paragraph and the environmental impacts of such...

  12. Assessing the influence of Environmental Impact Assessments on science and policy: an analysis of the Three Gorges Project.

    Science.gov (United States)

    Tullos, Desiree

    2009-07-01

    The need to understand and minimize negative environmental outcomes associated with large dams has both contributed to and benefited from the introduction and subsequent improvements in the Environmental Impact Assessment (EIA) process. However, several limitations in the EIA process remain, including those associated with the uncertainty and significance of impact projections. These limitations are directly related to the feedback between science and policy, with information gaps in scientific understanding discovered through the EIA process contributing valuable recommendations on critical focus areas for prioritizing and funding research within the fields of ecological conservation and river engineering. This paper presents an analysis of the EIA process for the Three Gorges Project (TGP) in China as a case study for evaluating this feedback between the EIA and science and policy. For one of the best-studied public development projects in the world, this paper presents an investigation into whether patterns exist between the scientific interest (via number of publications) in environmental impacts and (a) the identification of impacts as uncertain or priority by the EIA, (b) decisions or political events associated with the dam, and (c) impact type. This analysis includes the compilation of literature on TGP, characterization of ecosystem interactions and responses to TGP through a hierarchy of impacts, coding of EIA impacts as "uncertain" impacts that require additional study and "priority" impacts that have particularly high significance, mapping of an event chronology to relate policies, institutional changes, and decisions about TGP as "events" that could influence the focus and intensity of scientific investigation, and analysis of the number of publications by impact type and order within the impact hierarchy. From these analyses, it appears that the availability and consistency of scientific information limit the accuracy of environmental impact

  13. Evolution of environmental impact assessment as applied to watershed modification projects in Canada

    Science.gov (United States)

    Dirschl, Herman J.; Novakowski, Nicholas S.; Sadar, M. Husain

    1993-07-01

    This article reviews the application of environmental impact assessment (EIA) procedures and practices to three watershed modification projects situaled in western Canada. These ventures were justified for accelerating regional economic development, and cover the period during which public concerns for protecting the environment rapidly made their way into the national political agenda. An historical account and analysis of the situation, therefore, seems desirable in order to understand the development of EIA processes, practices, and methodologies since the start of construction of the first project in 1961. This study concludes that there has been good progress in predicting and evaluating environmental and related social impacts of watershed modification proposals. However, a number of obstacles need to be overcome before EIA can firmly establish itself as an effective planning tool. These difficulties include jurisdictional confusions and conflicts, division of authority and responsibility in designing and implementing appropriate mitigative and monitoring measures, lack of tested EIA methodologies, and limited availability of qualified human resources. A number of conclusions and suggestions are offered so that future watershed modification proposals may be planned and implemented in a more environmentally sustainable fashion. These include: (1) EIA processes must be completed before irrevocable decisions are made. (2) Any major intrusion into a watershed is likely to impact on some major components of the ecosystem(s). (3) Mitigation costs must form part of the benefit-cost analysis of any project proposal. (4) Interjurisdictional cooperation is imperative where watersheds cross political boundaries. (5) The EIA process is a public process, hence public concerns must be dealt with fairly. (6) The role of science in the EIA process must be at arms length from project proponents and regulators, and allowed to function in the interest of the protection of the

  14. Environmental impact assessment of transportation projects: An analysis using an integrated GIS, remote sensing, and spatial modeling approach

    Science.gov (United States)

    El-Gafy, Mohamed Anwar

    Transportation projects will have impact on the environment. The general environmental pollution and damage caused by roads is closely associated with the level of economic activity. Although Environmental Impact Assessments (EIAs) are dependent on geo-spatial information in order to make an assessment, there are no rules per se how to conduct an environmental assessment. Also, the particular objective of each assessment is dictated case-by-case, based on what information and analyses are required. The conventional way of Environmental Impact Assessment (EIA) study is a time consuming process because it has large number of dependent and independent variables which have to be taken into account, which also have different consequences. With the emergence of satellite remote sensing technology and Geographic Information Systems (GIS), this research presents a new framework for the analysis phase of the Environmental Impact Assessment (EIA) for transportation projects based on the integration between remote sensing technology, geographic information systems, and spatial modeling. By integrating the merits of the map overlay method and the matrix method, the framework analyzes comprehensively the environmental vulnerability around the road and its impact on the environment. This framework is expected to: (1) improve the quality of the decision making process, (2) be applied both to urban and inter-urban projects, regardless of transport mode, and (3) present the data and make the appropriate analysis to support the decision of the decision-makers and allow them to present these data to the public hearings in a simple manner. Case studies, transportation projects in the State of Florida, were analyzed to illustrate the use of the decision support framework and demonstrate its capabilities. This cohesive and integrated system will facilitate rational decisions through cost effective coordination of environmental information and data management that can be tailored to

  15. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  16. Application for approval of the Cold Lake Expansion Project: volume 2: environmental impact assessment: Part 1: biophysical and resource use assessment. Part 2: impact model descriptions

    International Nuclear Information System (INIS)

    Green, J.; Eccles, R.; Hegmann, G.; Morrison, L.; Salter, R.; van Egmond, T.; Vonk, P.; Ash, G.; Crowther, R.; Dance, T.; Edwards, W.; Veldman, W.

    1997-02-01

    An environmental assessment of the Cold Lake Expansion Project has been conducted to identify major issues of concern by public and government agencies, to determine means to eliminate or reduce those impacts, and to recommend any further efforts required to obtain missing information or monitor impacts. Volume 2 of the environmental impact assessment is divided into two parts. Part 1 (biophysical and resource use assessment) constitutes the primary environmental impact assessment document for the Cold Lake expansion project. It includes technical support documentation in regard to: (1) an assessment of noise impacts, (2) an assessment of greenhouse gas emissions, (3) a conceptual conservation and reclamation plan, (4) a historical resource impact assessment, and (5) a description of effects of oil spills on fish. Part 2 (impact model description) serves a reference document for part 1. It describes the approach taken in developing and assessing the impact models, discusses proposed methods for mitigation and management of residual impacts, and the recommended monitoring requirements for each of the major resource disciplines. The impact models describe the specific pathways through which impacts will occur as a result of interactions between project-related activities and important environmental components. 476 refs., 58 tabs., 23 figs

  17. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  18. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  19. A review of Environmental Impact Assessment parameters required for set up of a hydropower project

    International Nuclear Information System (INIS)

    Roy, Pankaj Kumar; Mazumdar, Asis

    2013-01-01

    Environmental Impact Assessment in general, hydro-meteorological conditions, topography, hydrology, water availability analysis of a river system, importance of hydropower and feasibility study of Environmental Impact assessment due to the construction of the hydropower plant have been discussed in this research work. The site selection is one of the major components so far the hydropower is concerned and also the minimum flow should have known to us so that the capacity of a hydropower plant can be predicted. The sustainable flow, which refers the flow is available throughout the year, has been calculated based on flow duration curve. This study highlights the environmental impact assessment particularly related to hydropower project. Here the study area a district town located in the eastern region of India on the banks of river Kosi has been considered. The historical rainfall and the river discharge data have been collected from various organizations. The stage-discharge correlation and hydrological parameters related to hydropower have been analyzed and also to discuss the review of environmental impact assessment in hydropower project. The EIA analysis can be also carried out by using fuzzy logic wherein the EIA parameters can be given different weight-age based on the various survey reports that have been carried out at different places at different time. Such analysis has also been provided below based on the various data obtained.

  20. The assessment of aesthetic and perceptual aspects within environmental impact assessment of renewable energy projects in Italy

    International Nuclear Information System (INIS)

    Tolli, Michela; Recanatesi, Fabio; Piccinno, Matteo; Leone, Antonio

    2016-01-01

    The main aim of this paper is to explore how perceptual and aesthetic impact analyses are considered in Environmental Impact Assessment (EIA), with specific reference to Italian renewable energy projects. To investigate this topic, the paper starts by establishing which factors are linked with perceptual and aesthetic impacts and why it is important to analyze these aspects, which are also related to legislative provisions and procedures in Europe and in Italy. In particular the paper refers to renewable energy projects because environmental policies are encouraging more and more investment in this kind of primary resource. The growing interest in this type of energy is leading to the realization of projects which change the governance of territories, with inevitable effects on the landscape from the aesthetic and perceptual points of view. Legislative references to EIA, including the latest directive regarding this topic show the importance of integrating the assessment of environmental and perceptual impacts, thus there is a need to improve EIA methodological approaches to this purpose. This paper proposes a profile of aesthetic and perceptual impact analysis in EIA for renewable energy projects in Italy, and concludes with recommendations as to how this kind of analysis could be improved. - Highlights: • We analyze 29 EIA Reports of Italian renewable energy projects. • We examine esthetic and perceptual aspects present in Italian EIA reports. • We identified inconsistency in use of methods for esthetic and perceptual aspects. • Local populations are rarely included as stakeholders in EIAs. • A shared understanding of perceptual and esthetic issues in EIA proceedings is required.

  1. The assessment of aesthetic and perceptual aspects within environmental impact assessment of renewable energy projects in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Tolli, Michela, E-mail: michela.tolli@uniroma1.it [Department of Architecture and Design (DiAP), Sapienza University of Rome, Via Gramsci 53, 00197 Rome (Italy); Recanatesi, Fabio, E-mail: fabio.rec@unitus.it [Department of Agriculture, Forests, Nature and Energy (D.A.F.N.E.), Tuscia University, Via S. Camillo de Lellis, 01100 Viterbo (Italy); Piccinno, Matteo; Leone, Antonio [Department of Agriculture, Forests, Nature and Energy (D.A.F.N.E.), Tuscia University, Via S. Camillo de Lellis, 01100 Viterbo (Italy)

    2016-02-15

    The main aim of this paper is to explore how perceptual and aesthetic impact analyses are considered in Environmental Impact Assessment (EIA), with specific reference to Italian renewable energy projects. To investigate this topic, the paper starts by establishing which factors are linked with perceptual and aesthetic impacts and why it is important to analyze these aspects, which are also related to legislative provisions and procedures in Europe and in Italy. In particular the paper refers to renewable energy projects because environmental policies are encouraging more and more investment in this kind of primary resource. The growing interest in this type of energy is leading to the realization of projects which change the governance of territories, with inevitable effects on the landscape from the aesthetic and perceptual points of view. Legislative references to EIA, including the latest directive regarding this topic show the importance of integrating the assessment of environmental and perceptual impacts, thus there is a need to improve EIA methodological approaches to this purpose. This paper proposes a profile of aesthetic and perceptual impact analysis in EIA for renewable energy projects in Italy, and concludes with recommendations as to how this kind of analysis could be improved. - Highlights: • We analyze 29 EIA Reports of Italian renewable energy projects. • We examine esthetic and perceptual aspects present in Italian EIA reports. • We identified inconsistency in use of methods for esthetic and perceptual aspects. • Local populations are rarely included as stakeholders in EIAs. • A shared understanding of perceptual and esthetic issues in EIA proceedings is required.

  2. Development of the UMTRA Project Groundwater Environmental Impact Statement

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Metzler, D.

    1993-01-01

    This paper discusses the development and preparation of the Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Groundwater Restoration Project. The initiation of the scoping process and preparation of the PEIS began when the Notice of Intent (NOI) to prepare the PEIS was published in the Federal Register on November 18, 1992. However, planning for the PEIS began well before the publication of the NOI, with various aspects of the PEIS, such as the initial formulation of the alternatives and the format of the scoping process, being developed early on. During this preliminary planning phase, it became clear that the preparation of this PEIS posed some significant challenges while at the same time provided for significant opportunities. This paper will briefly summarize the UMTRA Project, discuss the major sections in the PEIS, and describe the challenges and opportunities that developed during the preparation of the PEIS

  3. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  4. Yakima fisheries project. Revised draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (adaptive management); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery. Only minor differences in environmental consequences were found between Alternatives 1 and 2. Potentially high impacts on wild, native, and non-target fish populations under both alternatives would be mitigated through careful adherence to the adaptive management process outlined in the EIS

  5. Environmental impacts of renewable energy sources

    International Nuclear Information System (INIS)

    Abbasi, S.A.; Abbasi, N.

    1997-01-01

    The global attention has always been focused on the adverse environmental impacts of conventional energy sources. In contrast nonconventional energy sources, particularly the renewable ones, have enjoyed a clean image vis a vis environmental impacts. The only major exception to this general trend has been large hydropower projects; experience has taught that they can be disastrous for the environment. The belief now is that mini hydro and microhydro projects are harmless alternatives. But are renewable energy sources really as benign as is widely believed? The present essay addresses this question in the background of Lovin's classical paradigm which had postulated the hard (malignant) and soft (benign) energy concepts in the first place. It then critically evaluates the environmental impacts of major renewable energy sources. It then comes up with the broad conclusion that renewable energy sources are not the panacea they are popularly perceived to be; indeed in some cases their adverse environmental impacts can be as strongly negative as the impacts of conventional energy sources. The paper also dwells on the steps needed to utilize renewable energy sources without facing environmental backlashes of the type experienced from hydropower projects

  6. 76 FR 55703 - Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings...

    Science.gov (United States)

    2011-09-08

    ..., and physical and cyber security systems. The new JOC also must meet State essential service criteria... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings for the Joint Operations Center Relocation Project...

  7. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 2

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities. One of the first steps in the UMTRA Ground Water Project is the preparation of the Programmatic Environmental Impact Statement (PEIS). This report contains the comments and responses received on the draft PEIS

  8. A qualitative method proposal to improve environmental impact assessment

    International Nuclear Information System (INIS)

    Toro, Javier; Requena, Ignacio; Duarte, Oscar; Zamorano, Montserrat

    2013-01-01

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes the inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: • Concept of vulnerability has been used to calculate the importance impact assessment. • This paper defined Total Impact Importance and specified a quantification procedure. • The method includes the characteristics of environmental and project activities. • The application has shown greater objectivity in the evaluation of impacts. • Better correlation between impact values, environment and the project has been shown

  9. A qualitative method proposal to improve environmental impact assessment

    Energy Technology Data Exchange (ETDEWEB)

    Toro, Javier, E-mail: jjtoroca@unal.edu.co [Institute of Environmental Studies, National University of Colombia at Bogotá (Colombia); Requena, Ignacio, E-mail: requena@decsai.ugr.es [Department of Computer Science and Artificial Intelligence, University of Granada (Spain); Duarte, Oscar, E-mail: ogduartev@unal.edu.co [National University of Colombia at Bogotá, Department of Electrical Engineering and Electronics (Colombia); Zamorano, Montserrat, E-mail: zamorano@ugr.es [Department of Civil Engineering, University of Granada (Spain)

    2013-11-15

    In environmental impact assessment, qualitative methods are used because they are versatile and easy to apply. This methodology is based on the evaluation of the strength of the impact by grading a series of qualitative attributes that can be manipulated by the evaluator. The results thus obtained are not objective, and all too often impacts are eliminated that should be mitigated with corrective measures. However, qualitative methodology can be improved if the calculation of Impact Importance is based on the characteristics of environmental factors and project activities instead on indicators assessed by evaluators. In this sense, this paper proposes the inclusion of the vulnerability of environmental factors and the potential environmental impact of project activities. For this purpose, the study described in this paper defined Total Impact Importance and specified a quantification procedure. The results obtained in the case study of oil drilling in Colombia reflect greater objectivity in the evaluation of impacts as well as a positive correlation between impact values, the environmental characteristics at and near the project location, and the technical characteristics of project activities. -- Highlights: • Concept of vulnerability has been used to calculate the importance impact assessment. • This paper defined Total Impact Importance and specified a quantification procedure. • The method includes the characteristics of environmental and project activities. • The application has shown greater objectivity in the evaluation of impacts. • Better correlation between impact values, environment and the project has been shown.

  10. The environmental impacts of wind and water power

    International Nuclear Information System (INIS)

    Twidell, J.W.

    1994-01-01

    The success of a typical renewable energy project depends about 40% on technology and about 60% on institutional factors. The latter include regulations, financing and environmental impact, with many of the regulations and some financial factors themselves relating to environmental impact. This paper attempts to define and categorize aspects of environmental impact, especially regarding wind and hydro power projects. (author)

  11. Analysis on environmental impact of radiation from metallurgical project for rare metals

    International Nuclear Information System (INIS)

    Xia Zitong; Zhang Baozeng

    2012-01-01

    Rare metals are the composition of many high-property metal materials, which has a wide range of uses in the field of national defense advanced science technology. Since Ta-Nb material is associated radioactive mineral resources, and it contains high radionuclide, resulting in some radioactive indicators in process and workplace of the Ta-Nb smelting projects were significantly higher than that of the surrounding environmental radiation background. Based on the analysis of Ta-Nb smelting projects, the major sources of pollution were identified. and the possible radiation impact of the project was analyzed and evaluated, corrective measures on the process layout were also proposed, and reasonable suggestions of how to optimize the radiation protection were made. (authors)

  12. Quantification of environmental impacts of various energy technologies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Selfors, A [ed.

    1994-10-01

    This report discusses problems related to economic assessment of the environmental impacts and abatement measures in connection with energy projects. Attention is called to the necessity of assessing environmental impacts both in the form of reduced economic welfare and in the form of costs of abatement measures to reduce the impact. In recent years, several methods for valuing environmental impacts have been developed, but the project shows that few empirical studies have been carried out. The final report indicates that some important factors are very difficult to evaluate. In addition environmental impacts of energy development in Norway vary considerably from project to project. This makes it difficult to obtain a good basis for comparing environmental impacts caused by different technologies, for instance hydroelectric power versus gas power or wind versus hydroelectric power. It might be feasible however to carry out more detailed economic assessments of environmental impacts of specific projects. 33 refs., 1 fig., 4 tabs.

  13. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  14. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  15. Cumulative Impact Assessment: Approaching Environmental Capacity in Development Area Using Environmental Impact Assessment Information

    Science.gov (United States)

    Cho, N.; Lee, M. J.; Maeng, J. H.

    2017-12-01

    Environmental impact assessment estimates the impact of development as a business unit and establishes mitigation plan. If the development is done, its economic effects can spread to the nearby areas. So that various developments can be distributed at different time intervals. The impact of the new developments can be combined with existing environmental impacts and can have a larger impact. That is, Cumulative impact assessment is needed to consider the environmental capacity of the Nearby area. Cumulative impact assessments require policy tools such as environmental impact assessment information and cumulative impact estimation models. In Korea, environmental information (water quality, air quality, etc.) of the development site is measured for environmental impact assessment and monitored for a certain period (generally 5 years) after the project. In addition, by constructing the environmental information as a spatial database, it is possible to express the environmental impact on a regional basis spatially and to intuitively use it for development site selection. Utilizing a composite model of environmental impact assessment information and Remote Sensing data for cumulative impact estimation, That can be used as a policy decision support tool that provides quantitative information for development area management, such as time series effect and sprawl phenomenon.

  16. Environmental impacts of the extraction of forestry residues. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Brierley, E.; Truckell, I.; Brewer, T.; Towers, W.; Malcolm, A.; Walker, W.

    2004-07-01

    The environmental implications of the changes in forestry operations and practices necessary to remove significant quantities of forest residues for use as a fuel were investigated in this study commissioned by the UK Department of Trade and Industry. The project involved: a review of current practices for the treatment of residues and the production of wood fuels in Great Britain; an assessment of the impact of these practices on soils, landscape, water, flora, fauna and air; and the modelling of scenarios to identify the quantity of forestry land from which residues could be obtained to help meet UK targets for the use of renewable energy. This allowed an assessment of how practices may develop and how environmental impacts may change as a result of increased removal of forestry residues. The study included a literature review, discussions with the forestry and biomass industries and the selection of case study areas with a range of soil types. Differences in opportunities for residue harvesting between upland forestry in the north and west of the UK and lowland forestry in the south of the UK were highlighted by the model outputs.

  17. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  18. Environmental impact assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.; Kim, E. H.; Choi, K. S

    2000-10-01

    This report is the revised Environmental Impact Assessment Report which was made and submitted as one of the license documents for TRIGA Research Reactor D and D Project. The Environmental Impact Assessment Report includes introduction of decommissioning plan, status of reactors and environmental impact of surroundings. Also it was assessed and analyzed on radioactivity for environment, and the plan was established to minimize radioactive material release. Finally environmental monitoring plan was established to confirm whether contaminated or not from radioactivity during decommissioning period. According to the assessment results, the risk of excess exposure will be not on environment and public. The first Environmental Impact Assessment Report was submitted to the government for the license and reviewed by Korea Institute of Nuclear Safety. The first Report was revised including answers for the questions arising from review process.

  19. Predicting on-site environmental impacts of municipal engineering works

    International Nuclear Information System (INIS)

    Gangolells, Marta; Casals, Miquel; Forcada, Núria; Macarulla, Marcel

    2014-01-01

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering project documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also

  20. Predicting on-site environmental impacts of municipal engineering works

    Energy Technology Data Exchange (ETDEWEB)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu; Macarulla, Marcel, E-mail: marcel.macarulla@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering project documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also

  1. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  2. Radiation environmental impact assessment of copper exploitation

    International Nuclear Information System (INIS)

    Fan Guang; Wen Zhijian

    2010-01-01

    The radiation environmental impact of mineral exploitation on the surrounding environment has become a public concern. This paper presents the radiation environmental impact assessment of copper exploitation. Based on the project description and detailed investigations of surrounding environment, systematic radiation environmental impacts have been identified. The environmental impacts are assessed during both construction and operation phase. The environmental protection measures have also been proposed. The related conclusion and measures can play an active role in copper exploitation and environmental protection. (authors)

  3. Impact of financial institution environmental guidelines on international power generation projects

    International Nuclear Information System (INIS)

    Macak, J.J. III; Schott, G.A.

    1995-01-01

    Where financing is concerned, two major players for US based international power projects are The World Bank and the Export-Import Bank of the US (Ex-Im Bank). The concern for environmental protection is a global issue, yet many countries still have no enforceable environmental regulations for power generation facilities. In the past, many projects were developed with little or no environmental controls. However, designing a power generation project to meet The World Bank environmental guidelines is now generally regarded as standard practice for independent power projects in the developing world (Price et al, 1994). The World Bank standards are mandatory for projects financed by The World Bank, through the International Finance Corporation (IFC), or associated programs like the Expanded Cofinancing Program of the International Bank for Reconstruction and Development (IBRD). The Ex-Im Bank has recently established new environmental procedures and guidelines that went into effect on February 1, 1995. In order to avoid a competitive disadvantage for US exporters and still provide a means for global environmental protection, Ex-Im Bank has taken a leadership role in encouraging the adoption of common environmental procedures and standards by leading export credit agencies around the world. Until such procedures are established, Ex-Im Bank is seeking to establish common lines in specific cases with the Organization for Economic Cooperation and Development (OECD) on environmental standards for appropriate projects (Ex-Im, 1994)

  4. Gallon Model for the evaluation of environmental impacts

    International Nuclear Information System (INIS)

    Gallon Martinez, Juan Carlos

    2003-01-01

    When it is necessary to know the impact grade that will have the environment for the introduction of a project or handling plan, it is appealed to a study of environmental impact that quantifies variables of qualitative type to obtain results of quantitative type. The evaluation of environmental impacts is necessary to know which phases or actions of the different projects have negative or positive repercussions or far-reaching about the different susceptible environmental factors to receive impacts, and to determine previously, the most important aspects to determine the level of impact of the projects or handling plans. The evaluation measures the repercussions and consequences of the different activities of the industry on the environment, allowing to evaluate the future conditions of the habitat, being an excellent tool for making decisions regarding the possible future impact that can have an industrial process or project to diminish the nature

  5. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  6. 23 CFR 771.123 - Draft environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A... significant impacts on the environment. When the applicant, after consultation with any project sponsor that...

  7. Environmental impact assessment of projects in the People's Republic of China: new law, old problems

    International Nuclear Information System (INIS)

    Wang Yan; Morgan, Richard K.; Cashmore, Mat

    2003-01-01

    After more than 20 years of experience with environmental impact assessment (EIA), the government of the People's Republic of China is set to introduce a new EIA Law, in September 2003, in which strategic environmental assessment (SEA) complements the current project-oriented EIA process. In general, the new law does not attempt to modify the existing EIA system in any radical ways, suggesting that the government consider current practices satisfactory. In order to assess the likely prospects of the new EIA Law for project-level EIA, this paper presents an evaluation of the current EIA process in China, first, establishing the historical context of the current process and, second, considering the main issues and concerns relating to the institutional and procedural arrangements, and practical implementation of the process. The main problems highlighted are as follows: the narrow historic focus on pollution of air, water and soil, at the expense of the consideration of wider environmental, social and health impacts; environmental protection agencies being funded by development-oriented local government administrations; the lack of consideration of alternatives in EIA processes; and the lack of effective public participation. More specific procedural issues are also discussed. On the basis of this analysis, we make recommendations for improving the effectiveness of EIA at the project level. The introduction of SEA in the new law marks a real step forward for EIA in China, although it appears to exclude central government policies, and there are improved provisions for public participation. However, the prospects for EIA in China will remain mixed as long as the new law leaves project-level EIA largely unchanged

  8. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  9. Mid-Columbia Coho Reintroduction Feasibility Project. Final Environmental Assessment and Finding of No Significant Impact

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact

  10. Environmental and Social Impact Study: Final Report

    International Nuclear Information System (INIS)

    2011-04-01

    The tsetse control project (commonly known as tsetse flies) is an initiative of the Directorate of Livestock (project coordinating institution) and the ISRA (Senegalese Agricultural Research Institute) Accompaniment and diagnosis of the project. It is part of the cooperation between Senegal and the International Atomic Energy Agency (IAEA).The method of control that will be applied is the technique of sterile males.This technique of sterile males, however, is coupled with the use of deltamethrin (D6), a neurotoxic chemical (in adult insects) that is fast and fairly rapidly biodegradable in the environment.This study is carried out with the aim of taking good account of the environmental impacts of the various activities envisaged by the project. Its objective is to assess the biophysical, social and economic impacts of the project and to propose measures to mitigate or compensate for negative impacts and to reinforce positive impacts within the framework of an Environmental Management Plan and (ESMP). It also presents an environmental and social monitoring and monitoring plan to assess the effectiveness of the proposed mitigation measures.

  11. Economic and environmental impact analysis of new road network project, connecting the inland metropolitan cities with port city of Karachi in Pakistan

    International Nuclear Information System (INIS)

    Brohi, K.M.; Uqaili, M.A.; Harijan, K.

    2005-01-01

    Most of the developing countries face a lack of infrastructure facilities, where the road transport network is one of them. In this paper, firstly impacts of new road network project connecting with port city and inland metropolitan cities or northwest part of Pakistan are analyzed by using Computable General Equilibrium (CGE) model. Secondly, for the estimation of economic and environmental impacts of this project, a multi-regional CGE model is proposed. It is found that construction of this project is going to change the industrial structure, especially in production of manufacturing sector, and it will also change the Equivalent Variation (EV). It is also observed that remarkable economic and environmental impacts appeared in the inland metropolitan cities or northwest region than the rest of Pakistan. After analysis of these impacts, it is easy for government to make proper policy for maintaining economic impacts and reducing environmental impacts on national and regional level. (author)

  12. Environmental impact statement - an effective tool for successful mine design

    International Nuclear Information System (INIS)

    Sinha, A.K.

    1996-01-01

    Mining is a hazardous operation which must be designed to succeed under very unpredictable environmental, geological and marketing conditions over a committed life of thirty years or longer. It is well-established by now that mining has tremendous social, economic and environmental impacts on society in general and on local communities in particular. Mining's image has begun to improve with effective hazard controls and property reclamation through improved mine design and restoration plans. Much of the credit for this achievement should go to Environmental Impact Statement and related permitting requirements for mining projects. An Environmental Impact Statement with respect to almost every type of mining project is now frequently required by major banks, and other funding agencies, governmental agencies and/or citizen groups involved in the permitting process. This impact statement ensures that the proposed project has the potential to succeed under all foreseeable environmental, geological and marketing problems throughout its projected life and to guarantee the return of the initial capital with interest. In short, the impact statement offers assurance that the final project will culminate with positive environmental and social impacts. The relevance and contributions of Environmental Impact Statements in mine design, as well as their applications and development procedures are presented. 3 refs., 8 figs

  13. Environmental issues of the Three Gorges project

    International Nuclear Information System (INIS)

    Fang Ziyun

    1994-01-01

    This article addresses the environmental status of the reservoir area, reservoir characteristics, and the information systems used for assessment of environmental impacts. The Three Gorges Project and the environment are examined in detail and benefits for the Yangtze River's middle reaches, the impact of inundation, and impacts on aquatic animals, human health, natural landscape, cultural relics, water temperature and quality, the river estuary, and the surrounding area are considered. (UK)

  14. Quantitative analysis on the environmental impact of large-scale water transfer project on water resource area in a changing environment

    Directory of Open Access Journals (Sweden)

    D. H. Yan

    2012-08-01

    Full Text Available The interbasin long-distance water transfer project is key support for the reasonable allocation of water resources in a large-scale area, which can optimize the spatio-temporal change of water resources to secure the amount of water available. Large-scale water transfer projects have a deep influence on ecosystems; besides, global climate change causes uncertainty and additive effect of the environmental impact of water transfer projects. Therefore, how to assess the ecological and environmental impact of megaprojects in both construction and operation phases has triggered a lot of attention. The water-output area of the western route of China's South-North Water Transfer Project was taken as the study area of the present article. According to relevant evaluation principles and on the basis of background analysis, we identified the influencing factors and established the diagnostic index system. The climate-hydrology-ecology coupled simulation model was used to simulate and predict ecological and environmental responses of the water resource area in a changing environment. The emphasis of impact evaluation was placed on the reservoir construction and operation scheduling, representative river corridors and wetlands, natural reserves and the water environment below the dam sites. In the end, an overall evaluation of the comprehensive influence of the project was conducted. The research results were as follows: the environmental impacts of the western route project in the water resource area were concentrated on two aspects: the permanent destruction of vegetation during the phase of dam construction and river impoundment, and the significant influence on the hydrological situation of natural river corridor after the implementation of water extraction. The impact on local climate, vegetation ecology, typical wetlands, natural reserves and the water environment of river basins below the dam sites was small.

  15. Quantitative analysis on the environmental impact of large-scale water transfer project on water resource area in a changing environment

    Science.gov (United States)

    Yan, D. H.; Wang, H.; Li, H. H.; Wang, G.; Qin, T. L.; Wang, D. Y.; Wang, L. H.

    2012-08-01

    The interbasin long-distance water transfer project is key support for the reasonable allocation of water resources in a large-scale area, which can optimize the spatio-temporal change of water resources to secure the amount of water available. Large-scale water transfer projects have a deep influence on ecosystems; besides, global climate change causes uncertainty and additive effect of the environmental impact of water transfer projects. Therefore, how to assess the ecological and environmental impact of megaprojects in both construction and operation phases has triggered a lot of attention. The water-output area of the western route of China's South-North Water Transfer Project was taken as the study area of the present article. According to relevant evaluation principles and on the basis of background analysis, we identified the influencing factors and established the diagnostic index system. The climate-hydrology-ecology coupled simulation model was used to simulate and predict ecological and environmental responses of the water resource area in a changing environment. The emphasis of impact evaluation was placed on the reservoir construction and operation scheduling, representative river corridors and wetlands, natural reserves and the water environment below the dam sites. In the end, an overall evaluation of the comprehensive influence of the project was conducted. The research results were as follows: the environmental impacts of the western route project in the water resource area were concentrated on two aspects: the permanent destruction of vegetation during the phase of dam construction and river impoundment, and the significant influence on the hydrological situation of natural river corridor after the implementation of water extraction. The impact on local climate, vegetation ecology, typical wetlands, natural reserves and the water environment of river basins below the dam sites was small.

  16. 78 FR 8964 - Environmental Impact and Related Procedures

    Science.gov (United States)

    2013-02-07

    ... Administration 49 CFR Part 622 [Docket No. FTA-2011-0056] RIN 2132-AB03 Environmental Impact and Related... an environmental impact statement. DATES: Effective on February 7, 2013. FOR FURTHER INFORMATION... the list of project types that normally result in the preparation of an Environmental Impact Statement...

  17. Environmental Impact Statement: Waste Isolation Pilot Plant (WIPP): Executive summary

    International Nuclear Information System (INIS)

    1980-10-01

    The purpose of this document is to provide a summary of the environmental impact statement for the Waste Isolation Pilot Plant (WIPP) project. The Draft Environmental Impact Statement for the WIPP was published by the US Department of Energy (DOE) in April 1979. This document was reviewed and commented on by members of the general public, private organizations, and governmental agencies. The Final Environmental Impact Statement was subsequently published in October, 1980. This summary is designed to assist decision-maker and interested individuals in reviewing the material presented in the environmental impact statement for the WIPP project. To make this material widely available, this summary is published in both Spanish and English. Additional, more detailed information concerning the environmental and safety consequences of the WIPP project is available in the Final Environmental Impact Statement. Written comments and public hearing comments on the Draft Environmental Impact Statement are available for review. 27 refs., 4 figs., 7 tabs

  18. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  19. Methodological proposal for environmental impact evaluation since different specific methods

    International Nuclear Information System (INIS)

    Leon Pelaez, Juan Diego; Lopera Arango Gabriel Jaime

    1999-01-01

    Some conceptual and practical elements related to environmental impact evaluation are described and related to the preparation of technical reports (environmental impact studies and environmental management plans) to be presented to environmental authorities for obtaining the environmental permits for development projects. In the first part of the document a summary of the main aspects of normative type is made that support the studies of environmental impact in Colombia. We propose a diagram for boarding and elaboration of the evaluation of environmental impact, which begins with the description of the project and of the environmental conditions in the area of the same. Passing then to identify the impacts through a method matricial and continuing with the quantitative evaluation of the same. For which we propose the use of the method developed by Arboleda (1994). Also we propose to qualify the activities of the project and the components of the environment in their relative importance, by means of a method here denominated agglomerate evaluation. Which allows finding those activities more impacting and the mostly impacted components. Lastly it is presented some models for the elaboration and presentation of the environmental management plans. The pursuit programs and those of environmental supervision

  20. Environmental economic impact assessment in China: Problems and prospects

    International Nuclear Information System (INIS)

    Lindhjem, Henrik; Hu Tao; Ma Zhong; Skjelvik, John Magne; Song Guojun; Vennemo, Haakon; Wu Jian; Zhang Shiqiu

    2007-01-01

    The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline

  1. Evaluation of the environmental impact in Mexico

    International Nuclear Information System (INIS)

    Mendoza, O.

    2004-01-01

    The present work, shows the origin and development of the evaluation of the environmental impact in Mexico, like juridical-environmental instrument, it is the environmental politics' s instrument that is relatively new, with the time it has suffered modifications of technical, administrative, law and conceptual nature. It has changed in substantial form, its importance inside the general outline of protection of the natural resources of Mexico, which is reflected in the structure of the organisms that are responsible for applying it. The objectives of the work embrace describing the antecedents of the evaluation of the environmental impact, to provide a reference mark, and to observe the evolution of this juridical instrument, as well as to summarize more outstanding aspects of the evaluation of the environmental impact; making emphasis in the form like it has been related with the environmental politics' s instruments; and to point out the changes that the procedure of evaluation of the environmental impact has fomented in the development outlines, in the technology and even in the human thought. The results of the evaluation and dictamination of the projects that entered to the procedure of environmental impact in the period 1995-2000 are observed that of the 6,100 entered projects, 5,533 were resolved, which means that answer was given to 91% of the total of projects that entered; of the work it can be concluded that this juridical-environmental instrument, it has evolved with the step of the time and it has left adapting according to the juridical, administrative procedures, technicians and of sustainable development of Mexico

  2. 24 CFR 58.37 - Environmental impact statement determinations.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Environmental impact statement... Classification § 58.37 Environmental impact statement determinations. (a) An EIS is required when the project is... and Urban Development ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING HUD ENVIRONMENTAL...

  3. Human health and wellbeing in environmental impact assessment in New South Wales, Australia: Auditing health impacts within environmental assessments of major projects

    International Nuclear Information System (INIS)

    Harris, Patrick J.; Harris, Elizabeth; Thompson, Susan; Harris-Roxas, Ben; Kemp, Lynn

    2009-01-01

    Internationally the inclusion of health within environmental impact assessment (EIA) has been shown to be limited. While Australian EIA documentation has not been studied empirically to date, deficiencies in practice have been documented. This research developed an audit tool to undertake a qualitative descriptive analysis of 22 Major Project EAs in New South Wales, Australia. Results showed that health and wellbeing impacts were not considered explicitly. They were, however, included indirectly in the identification of traditional public health exposures associated with the physical environment and to a lesser extent the inclusion of social and economic impacts. However, no health data was used to inform any of the assessments, there was no reference to causal pathways between exposures or determinants and physical or mental health effects, and there was no inclusion of the differential distribution of exposures or health impacts on different populations. The results add conceptually and practically to the long standing integration debate, showing that health is in a position to add value to the EIA process as an explicit part of standard environmental, social and economic considerations. However, to overcome the consistently documented barriers to integrating health in EIA, capacity must be developed amongst EIA professionals, led by the health sector, to progress health related knowledge and tools.

  4. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR section 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents

  5. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 1: Executive summary

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to comply with Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act to the US Army Engineer District, Alaska (Corps). The application initiated the review process for BPXA's proposed project to develop and produce oil and gas from the Northstar Unit. The National Environmental Policy Act (NEPA) requires preparation of an Environmental Impact Statement (EIS) prior to any federal action that may significantly affect the quality of the human environment. The EIS is intended to provide federal agencies with information about the consequences of a proposed project and to disclose that information to the public, soliciting their comments, prior to the agencies making decisions on the project

  6. Final Environmental Impact Statement and Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    The US Department of Energy (DOE) and the Regents of the University of California (UC) propose the continued operation, including near-term proposed projects, of the Lawrence Livermore National Laboratory (LLNL). In addition, DOE proposes the continued operation, including near-term proposed projects, of Sandia National Laboratories, Livermore (SNL, Livermore). Continued operation plus proposed projects at the two Laboratories is needed so that the research and development missions established by Congress and the President can continue to be supported. As provided and encouraged by the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), DOE and UC have prepared this document as a joint Environmental Impact Statement (EIS) and Environmental Impact Report (EIR) to analyze the impacts of the proposed action. In addition, this document discusses a no action alternative for continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative focused on specific adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative. This document also examines the alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. The environmental documentation process provides information to the public, government agencies, and decision makers about the environmental impacts of implementing the proposed and alternative actions. In addition, this environmental documentation identifies alternatives and possible ways to reduce or prevent environmental impacts. A list of the issues raised through the EIS/EIR scoping process is presented

  7. Is Environmental Impact Assessment fulfilling its potential?

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen

    2014-01-01

    fuel with CO2-neutral energy sources. A variety of these projects are subject to environmental impact assessment (EIA), which raises the following questions: What role does an impact assessment play? When is the project environmentally friendly? How are climate change-related impacts assessed......One of the topics receiving much attention in recent years is climate change and the potential of its integration in impact assessment, both in terms of achieving mitigation and adaptation. Renewable energy projects are part of the efforts to mitigate climate change, replacing the use of fossil...... adaptation is absent. Also, the results show an emphasis on positive impacts in the reports, and in a few cases discussions of enhancements. Identification and assessment of negative climate change impacts are less apparent. This leads to a discussion of the results in the light of the purpose of EIA....

  8. Preliminary final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternative systems for conducting the ground water program. One of these systems is the proposed action. These alternatives do not address site-specific ground water compliance strategies, because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS presents multiple ground water compliance strategies, each with its own set of potential impacts, that could be used to implement all the alternatives presented in the PEIS except the no action alternative. The no action alternative must be considered by law. It consists of taking no action to meet EPA standards. Implementing all PEIS alternatives (except no action) means applying a ground water compliance strategy or a combination of strategies that would result in site-specific impacts

  9. 77 FR 74479 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2012-12-14

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9006-5] Environmental Impacts Statements; Notice of....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 12/03/2012 Through... Transit Project, Construction-Related Potential Impacts on Business Revenue, St. Paul and Twin Cities...

  10. Structural problems of public participation in large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    Bechmann, G.

    1989-01-01

    Four items are discussed showing that the problems involved through participation of the public in large-scale projects with environmental impact cannot be solved satisfactorily without suitable modification of the existing legal framework. The problematic items are: the status of the electric utilities as a quasi public enterprise; informal preliminary negotiations; the penetration of scientific argumentation into administrative decisions; the procedural concept. The paper discusses the fundamental issue of the problem-adequate design of the procedure and develops suggestions for a cooperative participation design. (orig./HSCH) [de

  11. 76 FR 53531 - Environmental Impact Statement: Hancock County, MS

    Science.gov (United States)

    2011-08-26

    ...)] Environmental Impact Statement: Hancock County, MS AGENCY: Federal Highway Administration (FHWA), Department Of... that an environmental impact statement will be prepared for a proposed highway project in Hancock... an Environmental Impact Statement (EIS) for the proposed widening and/or realignment of State Route...

  12. 78 FR 14117 - Draft Environmental Impact Statement/Environmental Impact Report for Yolo Bypass Salmonid Habitat...

    Science.gov (United States)

    2013-03-04

    ...The Bureau of Reclamation and California Department of Water Resources intend to prepare an environmental impact statement/ environmental impact report (EIS/EIR) for the implementation of actions I.6.1 and I.7 identified in the National Marine Fisheries Service's 2009 Biological Opinion and Conference Opinion on the Long-term Operation of the Central Valley Project and State Water Project Reasonable and Prudent Alternative. These actions consist of salmonid habitat restoration efforts within the lower Sacramento River basin and fish passage through the Yolo Bypass. We are seeking suggestions and information on the alternatives and topics to be addressed and any other important issues related to the proposed action.

  13. Environmental impacts during geothermal development: Some examples from Central America

    International Nuclear Information System (INIS)

    Goff, S.; Goff, F.

    1997-01-01

    The impacts of geothermal development projects are usually positive. However, without appropriate monitoring plans and mitigation actions firmly incorporated into the project planning process, there exists the potential for significant negative environmental impacts. The authors present five examples from Central America of environmental impacts associated with geothermal development activities. These brief case studies describe landslide hazards, waste brine disposal, hydrothermal explosions, and air quality issues. Improved Environmental Impact Assessments are needed to assist the developing nations of the region to judiciously address the environmental consequences associated with geothermal development

  14. 75 FR 49517 - Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project...

    Science.gov (United States)

    2010-08-13

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project, Lake and...: You may submit comments related to the Walker Ridge Wind Project by any of the following methods: Web... CONTACT: For further information and/or to have your name added to our mailing list, contact Bethney...

  15. 77 FR 49792 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2012-08-17

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9004-5] Environmental Impacts Statements; Notice of....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 08/06/2012 Through..., USFS, CA, On Top Hazardous Fuels Reduction Project, To Disclose the Environmental Effects of a Federal...

  16. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  17. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  18. Public participation in Malawi's environmental impact assessment ...

    African Journals Online (AJOL)

    Since the adoption of the Environmental Management Act of 1996, Malawi has been using environmental impact assessment (EIA) as a tool for predicting and assessing the impact of development projects on the environment. This study assessed the extent of public participation in Malawi's EIA process. Desktop study of ...

  19. 77 FR 68813 - Notice of Availability of the Draft Environmental Impact Statement and Environmental Impact...

    Science.gov (United States)

    2012-11-16

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA); the Federal Land Policy and Management Act of 1976, as amended; and the California Environmental Quality Act of 1970 (CEQA); the Bureau of Land Management (BLM) Bishop Field Office, Bishop, California; the United States Forest Service (USFS) Inyo National Forest; and the Great Basin Unified Air Pollution Control District (GBUAPCD) (a California state agency) have prepared a Draft Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development Project near the Town of Mammoth Lakes in Mono County, California. This notice announces the opening of the public comment period.

  20. Environmental Impact Section

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The Section is concerned with preparation of environmental statements and assessments and development of assessment methodologies for energy technologies. During 1976, activities involved nuclear, fossil, and geothermal energy; this work was supported by the U.S.Army, HUD, US ERDA, and US NRC. Two special studies--one on the effects of power plant intake structures on fish impingement and another on multiple uses of cooling lakes--were completed and should serve as references for future analyses. Two research projects sponsored by NRC--the Unified Transport Approach (UTA) to Power Plant Assessment and the Environmental Monitoring Data Evaluation Study--were continued. The purpose of the UA program is to develop fast-transient, one- and two-dimensional transport models for estimating thermal, radiological, chemical, and biological impacts in complicated water bodies. The impact of public use of various products that contain radioactive isotope is being evaluated. The Environmental Impact Sections assistance to NRC expanded to include assessments of fuel-fabrication facilities being considered for relicensing and two uranium in-situ solution mining facility proposals. The work for HUD comprises an assessment of the first application of MIUS in a new town development. A generic environmental statement was prepared and an environmental monitoring program for the facility was designed

  1. 76 FR 54767 - Environmental Impact Statements; Notice of Availability

    Science.gov (United States)

    2011-09-02

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8998-8] Environmental Impact Statements; Notice of....epa.gov/compliance/nepa/ . Weekly Receipt of Environmental Impact Statements Filed 08/22/2011 Through... the Chemistry and Metallurgy Research Replacement Project, To Address New Geologic Information...

  2. 75 FR 25309 - Environmental Impact Statement: Cook County, IL

    Science.gov (United States)

    2010-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... FHWA is issuing this Notice to advise the public that an Environmental Impact Statement (EIS) will be... project comprises several elements of the overall Chicago Region Environmental and Transportation...

  3. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1992-01-01

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document

  4. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  5. Environmental criteria to incorporate into civil engineering studies and projects to improve environmental impact assessment proceeding; Criterios ambientales a incorporar en proyectos de ingenieria civil para favorecer el procedimiento de Evaluacion de Impacto Ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Lazano Valero, I.; Palacios Garcia de la Rosa, D.; Doncel Moratilla, A.; Iglesias Perez, L.; Ortega Santos, L.; Varela Nieto, J. M.; Garcia Sanchez-Colomer, M.

    2009-07-01

    This study fulfils the need of establishing a guideline for environmental conditions that could be used to designing stages in projects submitted to Environmental Impact Assessment (EIA), in order to consider minimal requirements not only to encourage EIA proceedings but also to reduce Environmental Impact Statement (EIS) contents. EIS from the last 10 year for different civil works projects (roads, railways, airports, dams, hidroelectrical power stations, river channelizations, pipelines, water transfers, ports and works in the coast) have been studied, extracting all the environmental conditions found. Effectiveness and real implementation of theses conditions have been analysed in different phases of the project development, which have allowed a characterization of a series of environmental conditions that could improve environmental assessments and authorities decisions for EIS. (Author) 6 refs.

  6. 78 FR 4586 - Environmental Impact Statement: Kake Access, AK

    Science.gov (United States)

    2013-01-22

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Kake... Environmental Impact Statement (EIS) for a proposed transportation project to improve access to and from the... written comments on environmental concerns that should be addressed in the EIS. The public scoping...

  7. Climate Change in Environmental Impact Assessment of Renewable Energy Projects

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen

    2012-01-01

    Many renewable energy projects are subject to EIA. However a question that surfaces is what use an impact assessment is when the project is ‘good for the environment’? One of the current topics receiving much attention in impact assessment is climate change and how this factor is integrated...... in impact assessments. This warrants the question: How do we assess the climate change related impacts of a project that inherently has a positive effect on climate? This paper is based on a document study of EIA reports from Denmark. The results show that climate change is included in most of the EIA...... reports reviewed, and that only climate change mitigation is in focus while adaptation is absent. Also the results point to focus on positive impacts, while the indirect negative impacts are less apparent. This leads to a discussion of the results in the light of the purpose of EIA....

  8. North Central Transmission Line: Guidelines for the environmental impact statement

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines that Manitoba Hydro must follow in the preparation of the environmental impact statement on the proposed North Central Transmission Line (TCTL) project are presented. The project consists of a 138 kV transmission line, two 25 kV distribution lines, and related ancillary structures and facilities. The review process must be sensitive to cultural and community needs and must involve those most directly affected, and should be grounded in the impacted northern communities. The review should include a project background, the proposal, a description of the existing natural and socio-economic environment, and must address employment, education and training, impacts on renewable resource harvesting, environmental impacts, social impacts and economic impacts, legal/jurisdictional issues, infrastructure, mitigation and compensation, and environmental monitoring and follow-up. 1 fig., 20 tabs

  9. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  10. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  11. Environmental impact assessment in the Nordic Countries

    International Nuclear Information System (INIS)

    Broden, K.; Palsson, S.E.; Poroddsson, P.

    2000-12-01

    A meeting on Environmental Impact Assessment has been held in Iceland, September 2-6, 2000. It was held within the framework of the project NKS/SOS-3 (Radioactive waste), subproject NKS/SOS-3.1 (Environmental Impact Assessment). The meeting included presentations, discussions and a study trip to the Egilsstadir and Myvatn districts. (au)

  12. The likely adverse environmental impacts of renewable energy sources

    International Nuclear Information System (INIS)

    Abbasi, S.A.; Abbasi, Naseema

    2000-01-01

    The global attention has always been focused on the adverse environmental impacts of conventional energy sources. In contrast nonconventional energy sources, particularly the renewable ones, have enjoyed a 'clean' image vis a vis environmental impacts. The only major exception to this general trend has been large hydropower projects; experience has taught us that they can be disastrous for the environment. The belief now is that minihydel and microhydel projects are harmless alternatives. But are renewable energy sources really as benign as is widely believed? The present essay addresses this question in the background of Lovin's classical paradigm, which had postulated the hard (malignant) and soft (benign) energy concepts in the first place. It critically evaluates the environmental impacts of major renewable energy sources. It then comes up with the broad conclusion that renewable energy sources are not the panacea they are popularly perceived to be; indeed in some cases their adverse environmental impacts can be as strongly negative as the impacts of conventional energy sources. The paper also dwells on the steps we need to take so that we can utilise renewable energy sources without facing environmental backlashes of the type we got from hydropower projects. (Author)

  13. Regional restrictions on environmental impact assessment approval in China: the legitimacy of environmental authoritarianism

    NARCIS (Netherlands)

    Zhu, X.; Zhang, L.; Ran, R.; Mol, A.P.J.

    2015-01-01

    The poor enforcement and effectiveness of environmental impact assessment (EIA) on construction and investment projects in China has long been blamed for not preventing environmental pollution and degradation. At the same time, freezing EIA approval of all new projects in an administrative region,

  14. Overview of Environmental Impact Assessment of Oil and Gas ...

    African Journals Online (AJOL)

    The environmental impact assessment (EIA) of oil and gas projects in Nigeria ... natural, social and health components of the environment; Determination of issues ... of impact quantification through which the Environmental Management Plan ...

  15. Advanced mixed waste treatment project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-07-01

    The AMWTP DEIS assesses the potential environmental impacts associated with four alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. Four alternatives were analyzed: The No Action Alternative, the Proposed Action, the Non-Thermal Treatment Alternative, and the Treatment and Storage Alternative. The proposed AMWTP facility would treat low-level mixed waste, alpha-contaminated low-level mixed waste, and transuranic waste in preparation for disposal. Transuranic waste would be disposed of at the Waste isolation Pilot Plant in New Mexico. Low-level mixed waste would be disposed of at an approval disposal facility depending on decisions to be based on DOE's Final Waste Management Programmatic Environmental Impact Statement. Evaluation of impacts on land use, socio-economics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, INEEL services, and environmental justice were included in the assessment. The AMWTP DEIS identifies as the Preferred Alternative the Proposed Action, which is the construction and operation of the AMWTP facility

  16. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix K (continued)

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices K (continued) of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  17. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  18. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  19. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  20. Socio-economic Impact of Sethusamudram Project

    OpenAIRE

    Kannan, Srinivasan

    2007-01-01

    Any major development project has both benefits and disadvantages to the society. Many development projects have very high economic benefit and at the same time lead to environmental hazard. One such project is Sethudamudram project initiated by Government of India. This is a project which aims at minimising the distance of navigation for the goods transport in the sea. This paper is an attempt to study the socio-economic impact of the project based on the secondary data.

  1. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties... Joaquin County and Holland Tract and Webb Tract are located in Contra Costa County. A wetland delineation...

  2. Environmental impact assessment procedure: A new approach based on fuzzy logic

    International Nuclear Information System (INIS)

    Peche, Roberto; Rodriguez, Esther

    2009-01-01

    The information related to the different environmental impacts produced by the execution of activities and projects is often limited, described by semantic variables and, affected by a high degree of inaccuracy and uncertainty, thereby making fuzzy logic a suitable tool with which to express and treat this information. The present study proposes a new approach based on fuzzy logic to carry out the environmental impact assessment (EIA) of these activities and projects. Firstly, a set of impact properties is stated and two nondimensional parameters - ranging from 0 to 100 -are assigned, (p i ) to assess the value of the property and (v i ) to assess its contribution to each environmental impact. Next, the impact properties are described by means of fuzzy numbers p i - using generalised confidence intervals. Then, a procedure based on fuzzy arithmetic is developed to define the assessment functions v-bar = f(p-bar) - conventional mathematical functions, which incorporate the knowledge of these impact properties and give the fuzzy values v i - corresponding to each p i - . Subsequently, the fuzzy value of each environmental impact V-bar is estimated by aggregation of the values v i - , in order to obtain the total positive and negative environmental impacts V +- and V -- and, later - from them - the total environmental impact of the activity or project TV - . Finally, the defuzzyfication of TV - leads to a punctual impact estimator TV (1) - a conventional EI estimation - and its corresponding uncertainty interval estimator {(δ l (TV - ),δ r (TV - )}, which represent the total value of the environmental impact caused by the execution of the considered activity or project.

  3. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  4. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  5. 78 FR 46677 - Environmental Impact Statement; Calcasieu Parish, LA

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement...: The Federal Highway Administration is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed transportation project in Calcasieu Parish...

  6. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 4: Chapters 8 through 13

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains chapters 8--13 of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. Attention is focused on the following: effects of oil on the physical, biological, and human environments; effects of noise on the biological and human environments; cumulative effects on the environment; and comparison of project alternatives and their impacts

  7. Capacity development for environmental protection : towards better performing environmental impact assessment systems in low and middle income countries

    NARCIS (Netherlands)

    Kolhoff, A.J.

    2016-01-01

    Environmental Impact Assessment (EIA) is a legal tool used to support government decisions on projects that could harm the environment. It is applied to such decisions, to study the possible environmental impacts of the proposed project and any mitigating measures necessary to minimize them. In the

  8. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    Energy Technology Data Exchange (ETDEWEB)

    Hornung, M. [Inst. of Terrestrial Ecology, Grange-over-Sands (United Kingdom); Kellomaeki, S. [Joensuu Univ. (Finland). Dept. of Forestry; Larsen, J.B. [Royal Veterinary Univ., Fredriksberg (Denmark). Dept. of Economics and Natural Resources

    1995-12-31

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  9. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    Energy Technology Data Exchange (ETDEWEB)

    Hornung, M [Inst. of Terrestrial Ecology, Grange-over-Sands (United Kingdom); Kellomaeki, S [Joensuu Univ. (Finland). Dept. of Forestry; Larsen, J B [Royal Veterinary Univ., Fredriksberg (Denmark). Dept. of Economics and Natural Resources

    1996-12-31

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  10. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    International Nuclear Information System (INIS)

    Hornung, M.; Kellomaeki, S.; Larsen, J.B.

    1995-01-01

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK's aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  11. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  12. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 2: Chapters 1 through 4

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska (Corps) to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. The Corps determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significant affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), upon review of BPXA's permit application, determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternatives, including BPXA's proposed project, may have on the human environment

  13. Environmental impact statement requirements for CNEA

    International Nuclear Information System (INIS)

    Ciurciolo, Melisa N.; Mender, J. A.

    2009-01-01

    The purpose of this paper is to describe the legal framework on Environmental Impact Assessment (EIA) regarding the activities of the National Atomic Energy Commission (Comision Nacional de Energia Atomica, CNEA), and particularly, the Procedure for Internal Management of Environmental Impact Statements of CNEA (PN-PR-027). According to the distribution of powers stated in article 41 of the National Constitution, the environmental legal framework is constituted by National minimum standards for environmental protection and complementary provincial and municipal regulations. As a result, the EIA legal framework is not uniform across the Nation, and therefore, it differs according to the jurisdiction in which the activity subject to EIA is developed. Notwithstanding, the General Statute of the Environment (25.675) requires EIA for any project or activity developed in the National territory, which may cause a significant degradation to the environment, any of its components, or affect the populations' quality of life in a significant way. Since CNEA develops activities along the National territory, it is not possible to determine a uniform legal EIA framework for the entire Institution. Consequently, the binding requirements for Environmental Impact Statements (EISs) of CNEA activities differ among the activities developed in the different locations and atomic centers. In order to achieve a uniform environmental performance in CNEA, it has been considered necessary to uniform, in the internal sphere, the binding requirements for EIS, by means of a procedure written within the framework of the Environmental Management System of the Institution. The purpose of the Procedure for Internal Management of Environmental Impact Statements is to determine the requirements to be complied by the atomic centers, locations and enterprises associated with CNEA, regarding EIS Management. This Procedure shall apply to those projects and activities subjected to EIA, according to a

  14. Final Environmental Impact Statement to construct and operate the Crownpoint Uranium Solution Mining Project, Crownpoint, New Mexico

    International Nuclear Information System (INIS)

    1997-02-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of issuing a combined source and 11e(2) byproduct material license and minerals operating leases for Federal and Indian lands to Hydro Resources, Inc. (HRI). This action would authorize HRI to conduct in-situ leach uranium mining in McKinley County, New Mexico. Such mining would involve drilling wells to access the ore bodies, then recirculating groundwater with added oxygen to mobilize uranium found in the ore. Uranium would then be removed from the solution using ion exchange technology in processing plants located at three separate sites. As proposed by HRI, a central plant would provide drying and packaging equipment for the entire project. The Draft Environmental Impact Statement (DEIS) for the proposed action was prepared by an interagency review group comprising staff from the Nuclear Regulatory Commission, the Bureau of Indian Affairs, and the Bureau of Land Management, and published in October 1994. After evaluating the environmental impacts of the proposed action in the DEIS, the reviewing agencies concluded that the appropriate action was to issue the requested license and proposed leases authorizing HRI to proceed with the project. This FEIS reevaluates the proposed licensing action on the basis of written and oral comments received on the DEIS and on additional information obtained in 1995 and 1996. The FEIS describes and evaluates (1) the purpose of and need for the proposed action, (2) alternatives to the proposed action, (3) the environmental resources that could be affected by the proposed action and alternatives, (4) the potential environmental consequences of the proposed action and alternatives, and (5) the economic costs and benefits associated with the proposed action. Based on this assessment, the FEIS makes recommendations concerning the requested license and proposed leases

  15. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  16. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  17. The National Environmental Policy Act and DOE's programmatic environmental impact statement

    International Nuclear Information System (INIS)

    Wisenbaker, W.E.

    1991-01-01

    The National Environmental Policy Act (NEPA) of 1969 requires that all agencies of the federal government prepare a detailed statement on any action significantly affecting the quality of the human environment. Such a statement must include the environmental impact of the proposed action, any adverse environmental effects that cannot be avoided should the proposed action be implemented, and alternatives to the proposed action. In requiring environmental statements, NEPA encourages viewing related actions collectively and looking at cumulative impacts. A programmatic environmental impact statement (PEIS) is a broad environmental analysis of a program or policy prepared when actions are connected and may have cumulative environmental impacts. The PEIS benefits include providing input into an agency's planning and decision making, assessing potential environmental consequences of a wide range of alternatives before options have been foreclosed, and allowing consideration of systemwide impacts of various alternatives early in the decision-making process. The US Department of Energy (DOE) will prepare its PEIS on Environmental Restoration and Waste Management program. The PEIS will consider programmatic issues and integrated approaches to the program; address national, program-wide alternatives rather than site-specific actions; and provide for subsequent NEPA documents of narrower scope to be prepared to address site-specific or project-specific actions

  18. An environmental impact causal model for improving the environmental performance of construction processes

    OpenAIRE

    Fuertes Casals, Alba; Casals Casanova, Miquel; Gangolells Solanellas, Marta; Forcada Matheu, Núria; Macarulla Martí, Marcel; Roca Ramon, Xavier

    2013-01-01

    Despite the increasing efforts made by the construction sector to reduce the environmental impact of their processes, construction sites are still a major source of pollution and adverse impacts on the environment. This paper aims to improve the understanding of construction-related environmental impacts by identifying on-site causal factors and associated immediate circumstances during construc- tion processes for residential building projects. Based on the literature and focus g...

  19. Environmental assessment for the Waste Water Treatment Facility at the West Valley Demonstration Project and finding of no significant impact

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    The possible environmental impacts from the construction and operation of a waste water treatment facility for the West Valley Demonstration Project are presented. The West Valley Project is a demonstration project on the solidification of high-level radioactive wastes. The need for the facility is the result of a rise in the work force needed for the project which rendered the existing sewage treatment plant incapable of meeting the nonradioactive waste water treatment needs.

  20. Environmental assessment for the Waste Water Treatment Facility at the West Valley Demonstration Project and finding of no significant impact

    International Nuclear Information System (INIS)

    1992-01-01

    The possible environmental impacts from the construction and operation of a waste water treatment facility for the West Valley Demonstration Project are presented. The West Valley Project is a demonstration project on the solidification of high-level radioactive wastes. The need for the facility is the result of a rise in the work force needed for the project which rendered the existing sewage treatment plant incapable of meeting the nonradioactive waste water treatment needs

  1. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  2. A comprehensive environmental impact assessment method for shale gas development

    Directory of Open Access Journals (Sweden)

    Renjin Sun

    2015-03-01

    Full Text Available The great success of US commercial shale gas exploitation stimulates the shale gas development in China, subsequently, the corresponding supporting policies were issued in the 12th Five-Year Plan. But from the experience in the US shale gas development, we know that the resulted environmental threats are always an unavoidable issue, but no uniform and standard evaluation system has yet been set up in China. The comprehensive environment refers to the combination of natural ecological environment and external macro-environment. In view of this, we conducted a series of studies on how to set up a comprehensive environmental impact assessment system as well as the related evaluation methodology and models. First, we made an in-depth investigation into shale gas development procedures and any possible environmental impacts, and then compared, screened and modified environmental impact assessment methods for shale gas development. Also, we established an evaluating system and assessment models according to different status of the above two types of environment: the correlation matrix method was employed to assess the impacts on natural ecological environment and the optimization distance method was modified to evaluate the impacts on external macro-environment. Finally, we substitute the two subindexes into the comprehensive environmental impact assessment model and achieved the final numerical result of environmental impact assessment. This model can be used to evaluate if a shale gas project has any impact on environment, compare the impacts before and after a shale gas development project, or the impacts of different projects.

  3. Public participation in the licensing of large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    1989-01-01

    As a rule, public participation in licensing and planning procedures for large-scale projects with environmental impact is as controversial as the projects themselves. Against this background, an interdisciplinary examination of several 'cases' of public participation in administrative procedures with varying legal forms is being conducted in a joint research project run by the Department for Applied Systems Analysis (Karlsruher Nuclear Centre) and the Research Institute for Public Administration at the College for Administrative Sciences in Speyer. The actual course of events and the practical experience of the groups involved (authorities, applicants, objectors, experts) are related to the applicable legal arrangements for public participation. The question to be answered is: which expected and unexpected functions do the procedures actually fulfill and which not. Proposals for the amendment of legal policy could be developed upon the foundation of such a diagnosis. The report contains the results of the 'pilot study' on public participation in the licensing of the nuclear power plant GKN-2 in Neckarwestheim and further contributions on the issue of 'public participation', presented within the framework of a research colloquium at the School for Nuclear Technology/Karlsruhe Nuclear Research Centre. (orig.) [de

  4. Environmental impact analysis: the first five years of the National Environmental Policy Act in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Thorold, O

    1975-11-01

    The National Environmental Policy Act (NEPA) of 1969 was the first comprehensive law to subject decisions to an assessment of total environmental consequence and instill environmental attitudes throughout government. All agencies must submit impact projections of proposed as well as alternative actions. Twenty-one states have passed similar legislation. A review of the Act's provisions for oversight, court action, timing, content, and commenting procedures is followed by a five-year evaluation. Because NEPA is generally felt to be a realistic approach to decision making and not a substitute for other kinds of environmental control, Mr. Thorold feels the American experience has been positive and is worth modifying for other countries. The Act lacked a ''grandfather clause,'' which caused a difficult transition period while agencies coped with both new and existing projects and developed standards for identifying and reviewing impacts. As agencies recognized that delays from lawsuits often resulted from inadequate impact statements, the quality improved to meet the strict guidelines of the Council on Environmental Quality. Joint efforts of agencies, universities, consulting firms, and private groups have cooperated to improve environmental forecasting and promote full communication. The costs of preparing statements and those of abandoned projects are felt to be conservative when compared to the costs of pursuing inappropriate projects. (21 references) (DCK)

  5. FASSET - An European project for environmental protection

    International Nuclear Information System (INIS)

    Bruchertseifer, F.

    2003-01-01

    The European research project ''FASSET'' (Framework ASSessment of Enviromental ImpacT) will provide a framework of the environmental impact of the effects of ionising radiation and will identify protection aims for the environmental protection. This project represent a collaboration of different organisations from the European community: Sweden, Norway, Finland, Great Britain, Spain, France and Germany. The German participants are the GSF-research centre for environment and health and the German radiation protection office. The project is founded by the 5 th EC research programme. The existing national and international radiation protection regulations are focused to the humans. Other species, like plants and animals, are protected indirectly, if their habitat are close to urban areas or they represent a part of the food chain. The ICRP position ''if the man is protected, nature is protected as well'' is now under reconsideration by a ICRP-Taskgroup. The identification of perilled real reference organism by the FASSET-project is an working tool for the definition of the protection aims. For that purpose the project is divided into three working packages: dosimetry, exposure pathways and effects. Another working package is responsible for the developing of the concept using the results provided by the other working packages. (orig.)

  6. Evaluation of environmental impact assessment system in Pakistan

    International Nuclear Information System (INIS)

    Nadeem, Obaidullah; Hameed, Rizwan

    2008-01-01

    Environmental impact assessment (EIA) was first introduced in Pakistan based on the Environmental Protection Ordinance 1983. The EIA process was further strengthened under the Pakistan Environmental Protection Act 1997, which became operational under EIA Regulations 2000. Despite a sound legal basis and comprehensive guidelines, evidence suggests that EIA has not yet evolved satisfactorily in Pakistan. An evaluation of the EIA system against systematic evaluation criteria, based on interviews with EIA approval authorities, consulting firms and experts, reveals various shortcomings of the EIA system. These mainly include; inadequate capacity of EIA approval authorities, deficiencies in screening and scoping, poor EIA quality, inadequate public participation and weak monitoring. Overall, EIA is used presently as a project justification tool rather than as a project planning tool to contribute to achieving sustainable development. Whilst shortcomings are challenging, central government has recently shown a high degree of commitment to the environmental protection by making EIA compulsory for all the public sector projects likely to have adverse environmental impacts. The paper identifies opportunities for taking advantage of the current environment for strengthening the EIA process

  7. Environmental impact assessment of decommissioning treatment about radioactive model plant waste ore storage site

    International Nuclear Information System (INIS)

    Bei Xinyu

    2012-01-01

    Aiming at decommissioning treatment project of radioactive model plant waste ore storage site, based on the detailed investigations of source terms and project description, systematic environmental impacts have been identified. The environmental impacts both during decommissioning treatment, radioactive waste transportation and after treatment are assessed. Some specific environmental protection measures are proposed so as to minimize the adverse environmental impacts. (author)

  8. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices B through K

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US. Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices B--K of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  9. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices L through P

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices L-P of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  10. The role of geomorphology in environmental impact assessment

    Science.gov (United States)

    Cavallin, A.; Marchetti, M.; Panizza, M.; Soldati, M.

    1994-04-01

    This paper aims to define the role of Geomorphology in the assessment of the impact of human activities on the environment. Environmental impact assessment (EIA) should be carried out for specific projects, in order to evaluate their suitability for the quality of the environment. In fact, each planned activity may have an impact on various environmental components. Among these, the natural component must be examined in terms of geomorphological hazards, which may endanger a project, and of geomorphological assets (elements forming the educational and cultural heritage of the landscape), which may be damaged to various extents by human activities. The relationships between humans and environment are taken into account, with particular attention to the effects of a project on the geomorphological environment. From a geomorphological point of view, after having assessed the suitability of a certain location, mainly with respect to its morphography and morphometry, the geomorphological hazards of the area which may threaten the project (risk) must be considered; then the geomorphological assets, which may be damaged by the same project (direct impact) have to be individuated. Human activities may produce two other kinds of effect: the first refers to the consequences of the geomorphological hazards induced by a project on the project itself (direct risk) and on the surronding areas (indirect risk); the second takes into account the potential deterioration of a geomorphological asset due to hazards induced by the project (indirect impact). Examples of these different cases are presented.

  11. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  12. Superconducting Super Collider: Final environmental impact statement: Volume 1

    International Nuclear Information System (INIS)

    1988-12-01

    This Environmental Impact Statement (EIS) provides as much information as possible at this stage of the project development regarding the potential environmental impacts of the proposed construction and operation of a Superconducting Super Collider (SSC) at each of the site alternatives. However, the DOE recognizes that further review under the National Environmental Policy Act (NEPA) is required prior to construction and operation of the proposed SSC project at the selected site based on more detailed design and to identify specific mitigation measures which can be incorporated into final design. Accordingly, following selection of a site for the proposed SSC, the DOE will prepare a Supplemental EIS to address in more detail the impacts of constructing and operating the proposed SSC at the selected site and alternatives for mitigating those impacts. To measure the effects of constructing the SSC at any of the seven alternative sites, the DOE determined which aspects of the human environment would be significantly affected. The EIS describes the baseline conditions at each of the seven site alternatives, the trends underway resulting in changes, the potential environmental impacts expected if the SSC were sited, possible mitigations of adverse impacts, and resulting residual adverse impacts

  13. Alternatives and implication in process of environmental impact assessment

    Directory of Open Access Journals (Sweden)

    Tauš Peter

    2001-12-01

    Full Text Available EIA is an interactive, rule-based expert system for the environmental impact assessment. It is designed for a screening level assessment of development projects at a pre-feasibility stage. Typical problems for the evaluation include: resettlement; watershed degradation; encroachment upon precious ecosystems; encroachment on historical/cultural values; watershed erosion; reservoir siltation; impairment of navigation; changes in groundwater hydrology, waterlogging; seepage and evaporation losses; migration of valuable fish species; inundation of mineral resources/forests; other inundation losses and adverse effects. It is important to prevent environmental pollution when carrying out large-scale development projects, such as artificial change of landscapes and building of certain structures that may cause a tremendous impact on the environment. In accordance with Cities Environmental Impact Assessment Departments it is necessary to provide project organisers with a necessary advice and instructions concerning the environmental impact assessment a survey to predict and evaluate environmental impact to be conducted by project organisers. Prior to offering the advice and instructions, cities need to hear the opinions of residents of the areas concerned, mayors of related municipalities and other opinion leaders, including specialists, to reflect their views in the environmental preservation. The first aspect in any quality assessment is to determine the representativeness of data both in terms of physical siting and data collected. It must be recognised the environment is a dynamic fluid; quality therefore varies over space and time. There will be locations in any community that experience poorer quality than recorded at a monitoring station. Likewise other sites will have a better quality. Most communities have only a single monitoring site. Therefore, the air quality monitors are sited to provide a representative estimate of the community exposure

  14. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 1: Summary

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  15. 78 FR 11672 - Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project...

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.LVRWB11B4520.FX0000] Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project, Kern County, CA, and Proposed Land Use Plan Amendment AGENCY: Bureau of Land Management, Interior...

  16. Environmental impacts assessment of industrial estate providing with managerial process

    Energy Technology Data Exchange (ETDEWEB)

    Nouri, J.; Mahvi, A.H.; Younesian, M.; Nabizadeh, R.; Hashemi, I. [Univ. of Tehran (Iran)

    2007-07-01

    The existence of balance, coordination and required order among natural elements is one of the key factors in the ecosystem. If this balance is disturbed under certain circumstances, it will damage the structure of living existences and more specifically human beings. Since a half century ago, factors such as important economical and industrial activites, advanced technologies together with growing population and lack of concordance among different couhntries to take optimal advantage of the existing natural resources have distrubed the balance in the ecosystem. As a result, man has caused many problems such as high death tolls and arduous diseases due to the different pollutions in water, air, land, sound, temperature, etc and factors such as erosion, desert, expansion, floods, extinction of plant and animal species, ozone layer destruction, global warming, sea level rise and greenhouse gases increase. Environmental Impact Assessment (EIA) is to recognize and assess systematic consequences of projects and programs on elements like physicochemical, biological, cultural, economical and social phenomena in th environment; in other words it is a way or method to determine the direction of predication and assessment of environmental impacts of activities on the environmental health of the ecosystem affecting human lives. In this study, and environmental impact assessment of the establishment of the Shahzand Industrial Estate in Arak at the central part of Iran was investigated. After collection of data and analysis of the findings, the positive and negative impacts resulting from establishment of the indutrial estate were investigated using the Leopold Matrix and Scaling checklist methods providing the managerial solutions in order to minimize the harmful environmental impacts. The existing environmental situation was investigated and then environmental impact alternatives were determined. This was done in regard to the amount and kind of predicted pollution for the

  17. Effectiveness of Environmental Impact Assessment system in Estonia

    International Nuclear Information System (INIS)

    Heinma, Kaupo; Poder, Tonis

    2010-01-01

    To be effective, an Environmental Impact Assessment (EIA) system, first, has to minimize the probability that projects with significant environmental effects are implemented without EIA, and second, minimize the number of EIAs, which do not provide decision makers with essential information, so that the decision is improved as a result of EIA. The objective of this study was to find out how frequently in Estonia the projects implemented without EIA have caused significant environmental effects, and to measure the relative frequency of EIAs that have no influence on decision. An extensive survey with e-mail distributed questionnaires was carried out to reveal information from governmental agencies, local self-governments, and developers. There was no evidence that projects authorized without EIA have had environmental impacts, which could have been mitigated as a result of EIA. In contrast, about half of EIAs did not alter the decision of relevant authorities. This proportion was valid to both mandatory EIAs and those initiated on judgement basis. In our view, the proportion of no-influence EIAs was excessive and indicated the need to reconsider the provisions applying to the projects with a mandatory EIA requirement as well as judgements practice.

  18. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  19. Notice of availability, final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project

    International Nuclear Information System (INIS)

    1999-01-01

    BP Exploration (Alaska) Inc. (BPXA) is proposing to develop the Northstar Unit, located approximately 6 miles offshore of Point Storkensen in the Alaskan Beaufort Sea. BPXA's proposed action is a self-contained development/production facility located on a reconstructed gravel island in 39 feet of water. Also proposed is construction of two buried subsea pipelines between the island and shoreline to transport oil and gas. The pipelines would connect with onshore facilities and the Trans Alaska Pipeline System (TAPS). In response to BPXA's submittal of a permit application under Section 10 of the Rivers and Harbors Act, Section 404 of the Clean Water Act, and Section 103 of the Marine Protection Research and Sanctuaries Act, the US Army Corps of engineers, Alaska District (Corps) determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting by the EPA for BPXA's proposed project also constituted a major federal action that my significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternates, including BPXA's proposed project, may have on the human environment

  20. Environmental and social impacts of wind energy

    DEFF Research Database (Denmark)

    Borch, Kristian; Clausen, Niels-Erik; Ellis, Geraint

    2014-01-01

    The most common reasons for non- technical delays to wind energy projects are local resistance and poor strategic spatial planning. This chapter looks at the environmental and social impacts of wind energy and discusses how the public can gain trust in the public planning and private project...

  1. Ecological impact study methodology for hydrotechnical projects

    International Nuclear Information System (INIS)

    Manoliu, Mihai; Toculescu, Razvan

    1993-01-01

    Besides the expected benefits, hydrotechnical projects may entail unfavorable effects on the hydrological regime, environment, health and living conditions of the population. Rational water resource management should take into consideration both the favorable and unfavorable effects. This implies the assessment of socio-economic and environmental impacts of the changes of the hydrological regime. The paper proposes a methodology for carrying out impact studies of hydrotechnical projects. The results of the work are presented graphically on the basis of composite programing. A summary of mathematical methods involved in impact study design is also presented. (authors)

  2. Is environmental impact assessment regulation a 'burden' to private firms?

    International Nuclear Information System (INIS)

    Annandale, David; Taplin, Ross

    2003-01-01

    The impact of environmental regulation on macroeconomic performance has been studied in some depth over the last 15 years. Similarly, impact on profit performance, investment intention and location decisions of firms has also been studied, although in less depth. There has been less academic interest, however, in the impact that environmental regulation has on the strategic objectives of companies. This article reports on a research project that focused on the impact that environmental approvals regulation (predominantly environmental impact assessment, EIA) has on proposed new development in the international mining sector. Based on a large and externally valid survey of senior mining company executives in Australia and Canada in the late 1990s, the research indicated that a significant majority of firms consider the environmental approvals process to be an important determinant of investment strategy. An initial reaction to these figures might suggest that the majority of respondents believe the environmental approvals process to be a negative influence. However, further questioning indicated that only a small proportion of companies in both countries thought of the environmental approvals process as an impediment to development. Instead, it is clear that most firms see EIA as a catalyst for integrating environmental design into the early planning of a project, thereby alleviating the need to spend money on overcoming environmental problems once a poorly designed project has been commissioned. The somewhat surprising conclusion that companies see environmental approvals regulation as important, but as an encouragement to development rather than as an impediment, goes against much previous industry and academic comment and, at least in relation to the mining sector, refutes the idea that EIA is ''burdensome''

  3. The value of environmental impact assessments

    International Nuclear Information System (INIS)

    Sohocki, D.D.

    1996-01-01

    The environment and the economy are inextricably linked. Today the environmental, economic, and social associated with project and program decisions are at times of such a magnitude and duration that they exceed our ability to understand, let alone mitigate them. Energy production, distribution, pricing, policies, end uses, and externalities demonstrate the need for wise planning and informed decision making. International cooperation, based upon mutually shared respect, responsibility, and innovative solutions is an essential component of addressing contemporary issues, impacts, and opportunities. Both egypt and the united states have laws requiring environmental impact assessments. Just as egypt can learn from our successes and failures in the environmental impact assessment field over the past 36 years, the united states and other nations can learn as egypt develops and innovates its own approaches and solutions

  4. Medical Isotopes Production Project: Molybdenum-99 and related isotopes: Environmental Impact Statement, Volume I

    International Nuclear Information System (INIS)

    1996-04-01

    This Environmental Impact Statement (EIS) provides environmental and technical information concerning the U.S. Department of Energy's (DOE) proposal to establish a domestic source to produce molybdenum-99 (Mo-99) and related medical isotopes (iodine-131, xenon-133 and iodine-125). Mo-99, a radioactive isotope of the element molybdenum, decays to form metastable technetium-99 (Tc-99m), a radioactive isotope used thousands of times daily in medical diagnostic procedures in the U.S. Currently, all Mo-99 used in the U.S. is obtained from a single Canadian source. DOE is pursuing the Medical Isotopes Production Project in order to ensure that a reliable supply of Mo-99 is available to the U.S. medical community. Under DOE's preferred alternative, the Chemistry and Metallurgy Research Facility at the Los Alamos National Laboratory (LANL) and the Annular Core Research Reactor and Hot Cell Facility at Sandia National Laboratories/New Mexico (SNL/NM) would be used for production of the medical isotopes. In addition to the preferred alternative, three other reasonable alternatives and a no action alternative are analyzed in detail. The sites for the three reasonable alternatives are LANL, Oak Ridge National Laboratory (ORNL), and Idaho National Engineering Laboratory (INEL). The analyses in this EIS indicate no significant difference in the potential environmental impacts among the alternatives. Each of the alternatives would use essentially the same technology for the production of the medical isotopes. Minor differences in environmental impacts among alternatives relate to the extent of activity necessary to modify and restart (as necessary) existing reactors and hot cell facilities at each of the sites, the quantities, of low-level radioactive waste generated, how such waste would be managed, and the length of time needed for initial and full production capacity

  5. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  6. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  7. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  8. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-30

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project is expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality

  9. Preliminary evaluations of social and environmental impacts from mine-industrial project - uranium of Lagoa Real, Bahia, Brazil

    International Nuclear Information System (INIS)

    Negrao, F.I.; Oliveira, G.G. de; Zanetti, J.C.; Cunha, R.P.P. da.

    1990-01-01

    The Uranium Province of Lagoa Real is situated in the central south of the State of Bahia and constitutes at the moment the second uranium resource of Brazil, containing, in several anomalies, as available resource, 93.850 ton. of U sub(3) O sub(8). The Uranio do Brasil S.A. develops a mine-industrial complex in this Province with the aim to extract and benefit uranium and intending to improve in 1992. The project is considered with high hazard, because involves te management of radioactive material, and becomes necessary an available of environmental impact, in accordance with CONAMA 001/86 and an active participation of the society. This paper aims to indentify the social and environmental impacts of this process, as a contribution of this important discussion. (author)

  10. Qualitative assessment of environmental impacts through fuzzy logic

    International Nuclear Information System (INIS)

    Peche G, Roberto

    2008-01-01

    The vagueness of many concepts usually utilized in environmental impact studies, along with frequent lack of quantitative information, suggests that fuzzy logic can be applied to carry out qualitative assessment of such impacts. This paper proposes a method for valuing environmental impacts caused by projects, based on fuzzy sets theory and methods of approximate reasoning. First, impacts must be described by a set of features. A linguistic variable is assigned to each feature, whose values are fuzzy sets. A fuzzy evaluation of environmental impacts is achieved using rule based fuzzy inference and the estimated fuzzy value of each feature. Generalized modus ponens has been the inference method. Finally, a crisp value of impact is attained by aggregation and defuzzification of all fuzzy results

  11. Economic and environmental impacts of alternative transportation technologies.

    Science.gov (United States)

    2013-04-01

    This project has focused on comparing alternative transportation technologies in terms of their : environmental and economic impacts. The research is data-driven and quantitative, and examines the : dynamics of impact. We have developed new theory an...

  12. Methods of Environmental Impact Assessment in Colombia

    Directory of Open Access Journals (Sweden)

    Javier Toro Calderón

    2013-10-01

    Full Text Available The Environmental Impact Assessment (EIA in Colombia constitutes the primary tool for making decisions with respect to projects, works and activities (PWA with potential for significant environmental impacts. In the case of the infrastructure of the PWA, the EIA is mandatory and determines the environmental license (EL for construction and operation. This paper analyzes the methods used to assess the environmental impact of the PWA that have applied for licenses with the Ministry of Environment and Sustainable Development. It was found that the method most frequently used is the qualitative proposal by Conesa, with modifications that reduce the effectiveness of the EIA and favor the subjectivity and bias of the evaluator. Finally a series of recom­mendations to improve the process in the country are proposed.

  13. Environmental impact assessment of abnormal events: a follow-up study

    International Nuclear Information System (INIS)

    Hunsaker, D.B. Jr.; Lee, D.W.

    1985-01-01

    Impact analyses included in environmental assessments for a selected nuclear power plant, petroleum storage facility, crude oil pipeline, and geopressure well that have experienced operational, abnormal events are compared with the data quantifying the environmental impacts of the events. Comparisons of predicted vs actual impacts suggests that prediction of the types of events and associated impacts could be improved; in some instances, impacts have been underestimated. Analysis of abnormal events is especially important in environmental assessment documents addressing a technology that is novel or unique to a particular area. Incorporation of abnormal event impact analysis into project environmental monitoring and emergency response plans can help improve these plans and can help reduce the magnitude of environmental impacts resulting from said events

  14. Guidelines for comparative assessment of the environmental impacts of wastes from electricity generation systems. A framework for the assessment and comparison of environmental impacts

    International Nuclear Information System (INIS)

    1995-02-01

    The report describes the initial phase of a project intended to provide guidance to those concerned with environmental aspects of solid and hazardous waste management in electrical energy production systems. The focus is on describing a methodology for assessing and comparing the environmental impact arising from these wastes, and thereby to provide an input to overall electrical generation comparison projects, such as DECADES. The structure of the report is as follows: after considering a range of electrical energy production systems with an outline discussion of the waste streams produced in each case, the relevant treatment technologies and disposal options are reviewed. Then the elements of the framework for comparative assessment proposed in this report are described. The types of environmental impact, environmental protection criteria and indicators or end-points to measure the impact, the way in which such impacts can be quantitatively assessed and compared are discussed. 59 refs, figs and tabs

  15. Final Environmental Impact Statement/Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Impact Statement/Environmental Impact Report (EIS/EIR) is prepared pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). This document analyzes the potential environmental impacts of the proposed action: continued operation, including near-term (within 5 to 10 years) proposed projects, of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). Additionally, this document analyzes a no action alternative involving continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative to reduce adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. This document assesses the environmental impacts of the Laboratories' operations on air and water quality, geological and ecological systems, occupational and public health risks, prehistoric and historic resources, endangered species, floodplains and wetlands, socioeconomic resources, hazardous waste management, site contamination, and other environmental issues. The EIS/EIR is divided into five volumes and two companion reports. This volume contains the Final EIS/EIR technical appendices which provide technical support for the analyses in Volume 1 and also provide additional information and references

  16. Environmental setting for biological variability at PTEPBN project of West Kalimantan

    International Nuclear Information System (INIS)

    Suwadji, E.; Endrawanto

    1995-01-01

    Biological variability was needed in the arrangement of environmental evaluation study on term of environmental impact assessment. The activity was carried out at PTEPBN project to find out and to predict the environmental setting of outgoing and ongoing project as well as the project operational after post construction. Methods to find out the environmental setting on biological variability were proposed. Based on the observation data on its terrestrial and aquatic flora and fauna, it can be concluded that terrestrial flora was found at fair to good value, terrestrial fauna at fair to good whereas aquatic flora and fauna at good. (author). 8 refs, 7 tabs, 1 fig

  17. Quantitative indicators of the impacts generated in lineal development projects

    International Nuclear Information System (INIS)

    Ospina N, Jesus Efren; Lema T, Alvaro de J.

    2002-01-01

    This work outlines a methodological proposal for the elaboration of quantitative indicators of the impact caused by electrical power transmission projects, using the perspective of the model of environmental administration by dimensions (physical, biotic, cultural, economic, and political). The model achieved an integral and interdisciplinary analysis, managing to determine what the degree of impact that a project generates on a dimension and its relationships to the others, moreover the indicators identified are useful tools that should help support planning, project formulation, decisions making, and environmental studies, such as: environmental management plans and greater efficiency in the estimation of administrative costs, as well as in the techniques of generating location alternatives, and also may lead to better administration of economic and human resources, among others

  18. Transportation of foreign-owned enriched uranium from the Republic of Georgia. Environmental assessment for Project Partnership

    International Nuclear Information System (INIS)

    1998-01-01

    The Department of Energy (DOE) Office of Nonproliferation and National Security (NN) has prepared a classified environmental assessment to evaluate the potential environmental impact for the transportation of 5.26 kilograms of enriched uranium-235 in the form of nuclear fuel, from the Republic of Georgia to the United Kingdom. The nuclear fuel consists of primarily fresh fuel, but also consists of a small quantity (less than 1 kilogram) of partially-spent fuel. Transportation of the enriched uranium fuel would occur via US Air Force military aircraft under the control of the Defense Department European Command (EUCOM). Actions taken in a sovereign nation (such as the Republic of Georgia and the United Kingdom) are not subject to analysis in the environmental assessment. However, because the action would involve the global commons of the Black Sea and the North Sea, the potential impact to the global commons has been analyzed. Because of the similarities in the two actions, the Project Sapphire Environmental Assessment was used as a basis for assessing the potential impacts of Project Partnership. However, because Project Partnership involves a small quantity of partially-spent fuel, additional analysis was conducted to assess the potential environmental impacts and to consider reasonable alternatives as required by NEPA. The Project Partnership Environmental Assessment found the potential environmental impacts to be well below those from Project Sapphire

  19. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  20. Environmental impact assessment of nuclear desalination plant at KANUPP

    International Nuclear Information System (INIS)

    Sleem, M.

    2010-01-01

    A Nuclear Desalination Demonstration Plant (NDDP) of 1600 m/sup 3//d capacity is being installed at Karachi Nuclear Power Plant (KANUPP). A Nuclear Desalination Plant (NDP) can impact the aquatic environment mainly by subjecting the aquatic life to possible temperature increase and salinity changes in the vicinity of the cooling water and brine discharges. Any wastewater effluent, which will be discharged from the NDDP, may have some adverse effects on the marine life and general environment. In order to protect the environment and comply with the requirement of the Pakistan Environmental Protection Agency (PEPA) an Environmental Impact Assessment (EIA) for the discharged effluent from NDDP was carried out. In the present work baseline study was carried out for project location, climate, water resources, and ecology. Checklist has been prepared for identification of possible environmental impacts of the project and marked as insignificant, small, moderate or major impact. Appropriate mitigation measures have been recommended that can be incorporated into the intended program to minimize environmental impacts identified during the assessment. Specific conclusions of the study and recommendations have also been provided in this paper.

  1. South Carolina: Charleston County Area Project Impact Environmental Education Program (A Former EPA CARE Project)

    Science.gov (United States)

    The Charleston County Area Project Impact is the recipient of a Level II CARE cooperative agreement. The project is under the direction of the Charleston County Building Services Department, in Charleston, S.C.

  2. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  3. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  4. Salt Lake City Utah Integrated Projects electric power marketing. Final environmental impact statement, Volume 5: Appendix E

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  5. SITO, Environmental Impact of Major Industrial Activities

    International Nuclear Information System (INIS)

    Mazzini, M.; Oriolo, F.

    1982-01-01

    1 - Description of problem or function: SITO evaluates the impact of major industrial activities on the environment. The method applied accounts for the alterations of ecological, physico-chemical, aesthetical and social values caused by the development of the considered activity. Such values are usually considered as not quantifiable but very important for the quality of the environment. 2 - Method of solution: The territory affected by the industrial project is described in a one-dimensional (for example a coast development) or two-dimensional representation as a lattice of square meshes of equal size. A major feature of the model is that the impact factors are considered with reference to each single mesh. The following vectors and matrices are evaluated: a) Matrix of environmental quality characteristics. It is the product of the environmental quality index matrix and the vector of weighting factors. b) Vector of the initial environmental values. It is the sum of the columns of matrix (a). c) Matrix obtained when the environmental quality characteristics matrix is multiplied by the vector of project action factors, taking into account distance effects. d) Vector of the final environmental values. This is the sum of columns of matrix (c)

  6. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    International Nuclear Information System (INIS)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni

    2008-01-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  7. Environmental Impact Assessment for Olkiluoto 4 Nuclear Power Plant Unit in Finland

    Energy Technology Data Exchange (ETDEWEB)

    Dersten, Riitta; Gahmberg, Sini; Takala, Jenni [Teollisuuden Voima Oyj, Olkiluoto, FI-27160 Eurajoki (Finland)

    2008-07-01

    In order to improve its readiness for constructing additional production capacity, Teollisuuden Voima Oyj (TVO) initiated in spring 2007 the environmental impact assessment procedure (EIA procedure) concerning a new nuclear power plant unit that would possibly be located at Olkiluoto. When assessing the environmental impacts of the Olkiluoto nuclear power plant extension project, the present state of the environment was first examined, and after that, the changes caused by the projects as well as their significance were assessed, taking into account the combined impacts of the operations at Olkiluoto. The environmental impact assessment for the planned nuclear power plant unit covers the entire life cycle of the plant unit. (authors)

  8. Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-01

    The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

  9. Field verification of social and environmental issues of selected water sector projects in Punjab-Pakistan

    International Nuclear Information System (INIS)

    Ayesha, A.

    2012-01-01

    Irrigation helps in increasing the agricultural yield and the irrigation projects are carried out for the welfare of people. The importance of environment for sustainable development of irrigation projects has been realized. Environmental Impact Assessment is being increasingly used as a tool for appropriate environmental planning. In Pakistan, PEP A (Pakistan Environmental Protection Act),1997 establishes the framework to carry out Environmental Assessment of development projects. Various national and international agencies have developed Environmental Assessment Guidelines and Checklists for systematic evaluation of environmental impacts and their mitigation. The Social and Environmental Management Unit of Punjab Irrigation and Drainage Authority developed checklist for assessment of irrigation projects in 2007. The present study was conducted on three water sector projects namely: Concrete Lining of Dhudi Minor, Improving Nikki Deg Drain System and Rehabilitation of Khanki Barrage. The field verification of social and environmental issues of the projects was carried out according to the checklist of Social and Environmental Management Unit. The most noticeable impacts which were identified include: extended canal closure, emissions and effluents, waste generation and disposal, effect on flora, public health and safety, land acquisition, and social issues. The mitigatory measures proposed: proper project scheduling to minimize the canal closure periods, waste disposal through proper planning, preparation of detailed resettlement action plans and compensation, location of labor camps away from the settlements, avoiding unnecessary cutting of trees, and deployed machinery should be in good working condition. The recommendations of the study are to review and improve the checklists through a gradual and phased process into a more comprehensive social and environmental assessment process; capacity building of all the stake holders; collaboration between different

  10. Environmental impact assessment (EIA): an overlooked instrument for sustainable development in Pakistan.

    Science.gov (United States)

    Saeed, Rashid; Sattar, Ayesha; Iqbal, Zafar; Imran, Muhammad; Nadeem, Raziya

    2012-04-01

    Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.

  11. Final Environmental Impact Statement and Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Impact Statement/Environmental Impact Report (EIS/EIR) is prepared pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). This document analyzes the potential environmental impacts of the proposed action: continued operation, including near-term (within 5 to 10 years) proposed projects, of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). Additionally, this document analyzes a no action alternative involving continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative to reduce adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. This document assesses the environmental impacts of the Laboratories' operations on air and water quality, geological and ecological systems, occupational and public health risks, prehistoric and historic resources, endangered species, floodplains and wetlands, socioeconomic resources, hazardous waste management, site contamination, and other environmental issues. The EIS/EIR is divided into five volumes and two companion reports. This volume contains copies of the written comments and transcripts of individual statements at the public hearing and the responses to them

  12. Manual: environmental impact statement and intervention regulation

    International Nuclear Information System (INIS)

    Neumann, K.

    1992-01-01

    In order to be able to fulfil also legally the important tasks of environmental protection and natural preservation in the last ten years numerous legal provisions have been issued. Many of these laws require that the environmental impact of projects and constructional measures is taken into account to a higher degree. Two important instruments in this connection are the impact statement and the intervention regulation of natural preservation. Their importance and consequences for the planning and realization of projects are until now not sufficiently know. This manual is to fill this gap. This booklet shall help builder-owners and investors to realize their building projects in a way which is compatible with the environment. For architects and planners information is given in this manual about the requirements to be fulfilled in the individual planning and licensing procedures. The booklet is structured in a way that builder-owners, consultants and authorities find quickly the information needed. (orig./KW) [de

  13. Final Environmental Impact Statement and Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Impact Statement/Environmental Impact Report (EIS/EIR) is prepared pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). This document analyzes the potential environmental impacts of the proposed action: continued operation, including near-term (within 5 to 10 years) proposed projects, of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). Additionally, this document analyzes a no action alternative involving continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative to reduce adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. This document assesses the environmental impacts of the Laboratories' operations on air and water quality, geological and ecological systems, occupational and public health risks, prehistoric and historic resources, endangered species, floodplains and wetlands, socioeconomic resources, hazardous waste management, site contamination, and other environmental issues. The EIS/EIR is divided into five volumes and two companion reports. This volume contains the Final EIS/EIR, which in part relies on the detailed information in the appendices, and comprehensively discusses the proposed action, the alternatives, and the existing conditions and impacts of the proposed action and the alternatives

  14. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  15. A method to the impact assessment of the returning grazing land to grassland project on regional eco-environmental vulnerability

    International Nuclear Information System (INIS)

    Shao, Huaiyong; Sun, Xiaofei; Wang, Haoxue; Zhang, Xiaoxue; Xiang, Zhiying; Tan, Rui; Chen, Xuanyi; Xian, Wei; Qi, Jiaguo

    2016-01-01

    The Chinese government has conducted the Returning Grazing Land to Grassland Project (RGLGP) across large portions of grasslands from western China since 2003. In order to explore and understand the impact in the grassland's eco-environment during the RGLGP, we utilized Projection Pursuit Model (PPM) and Geographic Information System (GIS) to develop a spatial assessment model to examine the ecological vulnerability of the grassland. Our results include five indications: (1) it is practical to apply the spatial PPM on ecological vulnerability assessment for the grassland. This methodology avoids creating an artificial hypothesis, thereby providing objective results that successfully execute a multi-index assessment process and analysis under non-linear systems in eco-environments; (2) the spatial PPM is not only capable of evaluating regional eco-environmental vulnerability in a quantitative way, but also can quantitatively demonstrate the degree of effect in each evaluation index for regional eco-environmental vulnerability; (3) the eco-environment of the Xianshui River Basin falls into the medium range level. The normalized difference vegetation index (NDVI) and land use cover and change (LUCC) crucially influence the Xianshui River Basin's eco-environmental vulnerability. Generally, in the Xianshui River Basin, regional eco-environmental conditions improved during 2000 and 2010. The RGLGP positively affected NDVI and LUCC structure, thereby promoting the enhancement of the regional eco-environment; (4) the Xianshui River Basin divides its ecological vulnerability across different levels; therefore our study investigates three ecological regions and proposes specific suggestions for each in order to assist in eco-environmental protection and rehabilitation; and lastly that (5) the spatial PPM established by this study has the potential to be applied on all types of grassland eco-environmental vulnerability assessments under the RGLGP and under the similar

  16. A method to the impact assessment of the returning grazing land to grassland project on regional eco-environmental vulnerability

    Energy Technology Data Exchange (ETDEWEB)

    Shao, Huaiyong, E-mail: huaiyongshao@163.com [Key Laboratory of Geoscience Spatial Information Technology, Ministry of Land and Resources of China, Chengdu University of Technology, Chengdu 610059, Sichuan (China); Center for Global Change and Earth Observations, Michigan State University, East Lansing 48823, MI (United States); Sun, Xiaofei; Wang, Haoxue; Zhang, Xiaoxue [Key Laboratory of Geoscience Spatial Information Technology, Ministry of Land and Resources of China, Chengdu University of Technology, Chengdu 610059, Sichuan (China); Xiang, Zhiying [School of Earth Sciences, Zhejiang University, Hangzhou 310027, Zhejiang (China); Tan, Rui; Chen, Xuanyi [Key Laboratory of Geoscience Spatial Information Technology, Ministry of Land and Resources of China, Chengdu University of Technology, Chengdu 610059, Sichuan (China); Xian, Wei [College of Resources and Environment, Chengdu University of Information Technology, Chengdu 610225, Sichuan (China); Qi, Jiaguo [Center for Global Change and Earth Observations, Michigan State University, East Lansing 48823, MI (United States)

    2016-01-15

    The Chinese government has conducted the Returning Grazing Land to Grassland Project (RGLGP) across large portions of grasslands from western China since 2003. In order to explore and understand the impact in the grassland's eco-environment during the RGLGP, we utilized Projection Pursuit Model (PPM) and Geographic Information System (GIS) to develop a spatial assessment model to examine the ecological vulnerability of the grassland. Our results include five indications: (1) it is practical to apply the spatial PPM on ecological vulnerability assessment for the grassland. This methodology avoids creating an artificial hypothesis, thereby providing objective results that successfully execute a multi-index assessment process and analysis under non-linear systems in eco-environments; (2) the spatial PPM is not only capable of evaluating regional eco-environmental vulnerability in a quantitative way, but also can quantitatively demonstrate the degree of effect in each evaluation index for regional eco-environmental vulnerability; (3) the eco-environment of the Xianshui River Basin falls into the medium range level. The normalized difference vegetation index (NDVI) and land use cover and change (LUCC) crucially influence the Xianshui River Basin's eco-environmental vulnerability. Generally, in the Xianshui River Basin, regional eco-environmental conditions improved during 2000 and 2010. The RGLGP positively affected NDVI and LUCC structure, thereby promoting the enhancement of the regional eco-environment; (4) the Xianshui River Basin divides its ecological vulnerability across different levels; therefore our study investigates three ecological regions and proposes specific suggestions for each in order to assist in eco-environmental protection and rehabilitation; and lastly that (5) the spatial PPM established by this study has the potential to be applied on all types of grassland eco-environmental vulnerability assessments under the RGLGP and under the

  17. Environmental impact assessment in the Nordic Countries; Miljoekonsekvensbeskrivningar i Norden

    Energy Technology Data Exchange (ETDEWEB)

    Broden, K. [Studsvik RadWaste AB (Sweden); Palsson, S.E. [Geislavarnir rikisins (Iceland); Poroddsson, P. [Skipulagsstofnun (Iceland)

    2000-12-01

    A meeting on Environmental Impact Assessment has been held in Iceland, September 2-6, 2000. It was held within the framework of the project NKS/SOS-3 (Radioactive waste), subproject NKS/SOS-3.1 (Environmental Impact Assessment). The meeting included presentations, discussions and a study trip to the Egilsstadir and Myvatn districts. (au)

  18. Stake holder involvement in Posiva's environmental impact assessment

    International Nuclear Information System (INIS)

    Vira, J.

    2002-01-01

    The application for the Decision in Principle must include the report from a completed environmental impact assessment (EIA). In general, the purpose of the EIA legislation is to bring more transparency and interaction among potential stakeholders into the planning of projects that may have a significant impact on their physical or social environment. In addition, the EIA should look at different alternatives of the project implementation and also consider the impact of not implementing the project at all, i.e., the so-called zero-alternative. For Posiva the EIA was an important consultation process for determining the basis for the continuation of the disposal project. Because of the strong vetoes that the Finnish legislation gives to several stakeholders Posiva's EIA work was focused on subjects that the public found of greatest concern. In this respect important stakeholder groups included the local people of the investigation communities and their representatives in the municipality councils, the regulators, the public administrators dealing with environmental and energy policy issues, the scientific community involved in related research as well as the whole population and their political representatives at the national level. (authors)

  19. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  20. Assessing corporate project impacts in changeable contexts: A human rights perspective

    Energy Technology Data Exchange (ETDEWEB)

    Salcito, Kendyl, E-mail: kendyl.salcito@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States); Singer, Burton H., E-mail: bhsinger@epi.ufl.edu [Emerging Pathogens Institute, University of Florida, Gainesville, FL 32610 (United States); Krieger, Gary R., E-mail: gkrieger@newfields.com [NewFields, LLC, Denver, CO 80202 (United States); Weiss, Mitchell G., E-mail: mitchell-g.weiss@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland); Wielga, Mark, E-mail: wielga@nomogaia.org [NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202 (United States); NewFields, LLC, Denver, CO 80202 (United States); Utzinger, Jürg, E-mail: juerg.utzinger@unibas.ch [Department of Epidemiology and Public Health, Swiss Tropical and Public Health Institute, P.O. Box, CH-4002 Basel (Switzerland); University of Basel, P.O. Box, CH-4003 Basel (Switzerland)

    2014-07-01

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact

  1. Assessing corporate project impacts in changeable contexts: A human rights perspective

    International Nuclear Information System (INIS)

    Salcito, Kendyl; Singer, Burton H.; Krieger, Gary R.; Weiss, Mitchell G.; Wielga, Mark; Utzinger, Jürg

    2014-01-01

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact assessment

  2. Stakeholder Pressures, Environmental Impact and Managerial Initiatives of SMEs

    DEFF Research Database (Denmark)

    Madsen, Henning; Ulhøi, John Parm

    2015-01-01

    impact was available in Denmark. Consequently, a longitudinal research project was initiated to enlighten the situation. This study investigates environmentally related initiatives taken in response to the perception of stakeholder pressures and the perceived corporate environmental impact. The empirical......Environmental sustainability has become an issue of uttermost importance for business organisations. Therefore, the implementation of corporate environmental initiatives has been vigorously embraced by industry. Two decades ago, no clear picture of industry initiatives to reduce their environmental...... popularity of self-regulation, voluntary initiatives do not tend to be widely adopted by SMEs, stressing a need for a continuing regulation of industry’s behaviour in relation to environmental issues....

  3. Protected Area Reconfiguration Project. Environmental Assessment and Finding of No Significant Impact

    International Nuclear Information System (INIS)

    1995-12-01

    DOE has decided to consolidate, process, and store Category I and II Special Nuclear Material (SNM) in Building 371 at Rocky Flats, in order to improve safeguards and security and to reduce baseline facility and personnel costs. Once all SNM in consolidated into this building, maintaining the full 200-acre protected area would no longer be necessary, and the protected area (PA) could be reconfigured to include only the protection requirements necessary for Building 371. DOE Environmental Assessment 1132 has been written to evaluate options for reconfiguration of the PA; it addressed potential environmental impacts resulting from construction of fence alternatives. Possible routes for the new fence section were examined for environmental impact, feasibility, cost, and complexity. A number of the alternatives, including the proposed action, would impact wetlands

  4. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  5. 77 FR 17051 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2012-03-23

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9002-2] Environmental Impacts Statements; Notice of..., ME, I-395/Route 9 Transportation System, To Improve Transportation System Linkage, Safety, and... Safety Modification Project, To Remediate Seismic, Seepage, and Hydrologic Deficiencies in the Main Dam...

  6. Reducing the global environmental impacts of rapid infrastructure expansion

    NARCIS (Netherlands)

    Laurance, William F.; Peletier-Jellema, Anna; Geenen, Bart; Koster, Harko; Verweij, Pita|info:eu-repo/dai/nl/145431843; Van Dijck, Pitou; Lovejoy, Thomas E.; Schleicher, Judith; Van Kuijk, Marijke|info:eu-repo/dai/nl/304834319

    2015-01-01

    Infrastructures, such as roads, mines, and hydroelectric dams, are proliferating explosively. Often, this has serious direct and indirect environmental impacts. We highlight nine issues that should be considered by project proponents to better evaluate and limit the environmental risks of such

  7. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  8. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  9. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Science.gov (United States)

    2012-04-20

    ...-FF08RSFC00] Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental... environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and..., while providing public access and recreational and educational opportunities compatible with ecological...

  10. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  11. Quality of environmental impact statements in Portugal and Spain

    International Nuclear Information System (INIS)

    Canelas, Leonel; Almansa, P.; Merchan, M.; Cifuentes, Pedro

    2005-01-01

    One of the key steps of the Environmental Impact Assessment Process, defined by Directive 337/85 'on the assessment of the effects of certain public and private projects' is the preparation of the Environmental Impact Statement (EIS) of a Project. The quality of the EIS is of great importance to properly inform the public and the decision makers about the significant environmental effects of the project. Using the 'Guidance on EIA-EIS Review' 2001 report, produced with the support of the European Commission, this paper analyses the overall quality of 46 recently elaborated EIS from Portugal and Spain (1998-2003). It also analyses the quality of the various chapters of the EIS and the Non-Technical Summary. A comparison is made between the quality of the EIS from Portugal and from Spain. The results for Portugal are also compared with those of other European countries (Ireland and United Kingdom) in similar periods. Finally it presents overall conclusions and suggestions for improvement

  12. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  13. Road ecology in environmental impact assessment

    International Nuclear Information System (INIS)

    Karlson, Mårten; Mörtberg, Ulla; Balfors, Berit

    2014-01-01

    Transport infrastructure has a wide array of effects on terrestrial and aquatic ecosystems, and road and railway networks are increasingly being associated with a loss of biodiversity worldwide. Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are two legal frameworks that concern physical planning, with the potential to identify, predict, mitigate and/or compensate transport infrastructure effects with negative impacts on biodiversity. The aim of this study was to review the treatment of ecological impacts in environmental assessment of transport infrastructure plans and projects. A literature review on the topic of EIA, SEA, biodiversity and transport infrastructure was conducted, and 17 problem categories on the treatment of biodiversity were formulated by means of a content analysis. A review of environmental impact statements and environmental reports (EIS/ER) produced between 2005 and 2013 in Sweden and the UK was then conducted using the list of problems as a checklist. The results show that the treatment of ecological impacts has improved substantially over the years, but that some impacts remain problematic; the treatment of fragmentation, the absence of quantitative analysis and that the impact assessment study area was in general delimited without consideration for the scales of ecological processes. Actions to improve the treatment of ecological impacts could include improved guidelines for spatial and temporal delimitation, and the establishment of a quantitative framework including tools, methods and threshold values. Additionally, capacity building and further method development of EIA and SEA friendly spatial ecological models can aid in clarifying the costs as well as the benefits in development/biodiversity tradeoffs. - Highlights: • The treatment of ecological impacts in EIA and SEA has improved. • Quantitative methods for ecological impact assessment were rarely used • Fragmentation effects were recognized

  14. Road ecology in environmental impact assessment

    Energy Technology Data Exchange (ETDEWEB)

    Karlson, Mårten, E-mail: mkarlso@kth.se; Mörtberg, Ulla, E-mail: mortberg@kth.se; Balfors, Berit, E-mail: balfors@kth.se

    2014-09-15

    Transport infrastructure has a wide array of effects on terrestrial and aquatic ecosystems, and road and railway networks are increasingly being associated with a loss of biodiversity worldwide. Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are two legal frameworks that concern physical planning, with the potential to identify, predict, mitigate and/or compensate transport infrastructure effects with negative impacts on biodiversity. The aim of this study was to review the treatment of ecological impacts in environmental assessment of transport infrastructure plans and projects. A literature review on the topic of EIA, SEA, biodiversity and transport infrastructure was conducted, and 17 problem categories on the treatment of biodiversity were formulated by means of a content analysis. A review of environmental impact statements and environmental reports (EIS/ER) produced between 2005 and 2013 in Sweden and the UK was then conducted using the list of problems as a checklist. The results show that the treatment of ecological impacts has improved substantially over the years, but that some impacts remain problematic; the treatment of fragmentation, the absence of quantitative analysis and that the impact assessment study area was in general delimited without consideration for the scales of ecological processes. Actions to improve the treatment of ecological impacts could include improved guidelines for spatial and temporal delimitation, and the establishment of a quantitative framework including tools, methods and threshold values. Additionally, capacity building and further method development of EIA and SEA friendly spatial ecological models can aid in clarifying the costs as well as the benefits in development/biodiversity tradeoffs. - Highlights: • The treatment of ecological impacts in EIA and SEA has improved. • Quantitative methods for ecological impact assessment were rarely used • Fragmentation effects were recognized

  15. landscape incorporation in the environmental impact studies

    International Nuclear Information System (INIS)

    Gutierrez G, Luz Angela

    2000-01-01

    A general overview on landscape analysis showing the two principal approaches to their study, the article emphasize on the need of taking landscape in consideration on the making of the environmental impact study of any project of development

  16. Environmental Impact Assessment in Sustainable Water Resources ...

    African Journals Online (AJOL)

    During project study and design, major environmental impacts of water ... should be identified and made available for decision makers and the public. ... remotely sensed data can be analysed in GIS environment to generate data and map the ...

  17. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review... impact on the environment, and therefore do not require environmental impact statements (EIS). Under current IHS procedures, an environmental review is performed on all construction projects. During the IHS...

  18. Interdisciplinary environmental impact statement examinations with parallel licensing procedures

    International Nuclear Information System (INIS)

    Gassner, E.

    1990-01-01

    The article investigates the question how the interdisciplinary, collective, integrative environmental impact statement can predominate the decisions in individual licensing procedures. It illustrates the requirements of the Act on Environmental Impact Statements. According to this Act, measures are to be found which deal with the overall complex, i.e. the entire system. In the article, the monitoring project organization's primary responsibility is emphasized: Analysis and prognosis of a project's environmental impacts are transferred to this organization for decision-preparation. Subsequent corrections or supplementations during the official approval procedure, or incorporation of the public through the authorities, do not change the matter. An all-comprehensive assessment must be based on all-comprehensive standards. From the point of view of immissions this is minimization of adverse effects on the nature cycle and landscape matters; from the point of view of emissions it is the duty of environment-compatible waste management within the sense of waste management legislation having to serve public welfare. (orig.) [de

  19. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are

  20. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    International Nuclear Information System (INIS)

    1996-01-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings ' ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings.' Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  1. How environmental costs impact DSM

    International Nuclear Information System (INIS)

    Sim, S.R.

    1991-01-01

    This article examines the impacts of environmental costs of electricity generation into utility planning of demand side management (DSM) programs. The topics include approach and assumptions, overview of spreadsheet approach, results of the analyses, and the application of this approach to other areas of utility management such as new generation projects, sales of new generation capacity, and utility liability and management prudency

  2. 75 FR 57548 - Environmental Impact Statement: U.S. 64/Corridor K. The Project Begins on U.S. 64 From West of...

    Science.gov (United States)

    2010-09-21

    ... that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in Polk County, Tennessee. FOR FURTHER INFORMATION CONTACT: Mr. Charles J. O'Neill, Planning and Program..., Suite 508, Nashville, Tennessee 37217, Telephone: (615) 781-5770, E-mail: Charles[email protected

  3. Environmental impacts of the Super Collider

    International Nuclear Information System (INIS)

    Baillieul, T.A.; Hasselkus, W.

    1991-01-01

    The National Environmental Policy Act of 1969, affectionately referred to as NEPA, is a simple piece of legislation with far-reaching implications. (a) It sets a requirement for Federal government decision makers to consider the environmental consequences of their actions before deciding on a course of action. (b) A decision maker is essentially anyone who causes something to happen; and the action can be just about anything. (c) NEPA comes into play at the point in time where a proposed action is matched to a physical location. (d) NEPA implementation is recorded in many ways. The DOE maintains a long list of categorical exclusions for actions which practice has shown to be inconsequential - such as processing records, or maintaining physical plants. However, in selecting a categorical exclusion for an action, the decision maker/project manager must at least think about the activity to be performed and its possible environmental consequences. (e) A large project like the SSC, involving an undeveloped site, automatically qualifies for the highest level of environmental analysis under NEPA - the Environmental Impact Statement (or EIS)

  4. Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    2006-09-01

    BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative

  5. Salt Lake City Area Integrated Projects electric power marketing final environmental impact statement. Volume 4: Appendixes B-D

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alter native

  6. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 2: Sections 1--16

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  7. Environmental and health impact assessment for ports in Thailand.

    Science.gov (United States)

    Chanchang, Chamchan; Sithisarankul, Pornchai; Supanitayanon, Thanawat

    2016-01-01

    Port development in Thailand is an essential part of the national maritime interest in connection with ship and shore activities. The growth of maritime industry and transportation has led to the expansion of ports' areas and capacity. Each port type causes different environmental impacts. Therefore, the Port Authority of Thailand has set up guidelines on ports' environmental management. This is divided into 3 major phases; namely, planning, construction and operation commencement periods. The Report of Environmental and Health Impact Assessment (EIA, HIA and EHIA) is regarded as the environmental management process in the planning period. It is a key tool to anticipate and prevent any adverse effects that might occur on the environment as well as community health resulting from the project implementation. This measure, in turn, creates advance preparation on both the preventive and problem-solving means before the project gets off the ground. At present, the majority of new projects on port development have still been in the process of information gathering for EHIA submission. Some cannot start to operate due to their EHIA failure. For example, the Tha-sala port which did not pass EHIA, mainly because emphasis had been focused on adhering to legal regulations without taking into consideration the in-depth analysis of data being conducted by community entities in the area. Thus caused the project to be finally abolished. Impact assessment on environment and health should be aimed at detailed understanding of the community in each particular area so that effective data of objective achievement in preventing environmental problems could actually be carried out and welcomed by the concerned society.

  8. Environmental impact assessment in practice: A gender critique

    International Nuclear Information System (INIS)

    Kurian, P.A.; Purdue Univ., West Lafayette, IN

    1995-01-01

    The author evaluates the extent to which environmental impact assessment (EIA) as conceptualized by EIA systems is a gendered process. Through a discourse analysis of in-depth interviews with bureaucrats, technocrats, and activists involved with the Sardar Sarovar dam project in India, the author examines the practice of EIA in a Third World country. She uses a theoretical framework, informed by a theory of gender, to evaluate the interviews. In practice, EIA is marked by gender biases that ignore the gender-specific nature of impacts. Such biases distort the impact assessment process, making environmental sustainability difficult, if not impossible, to achieve

  9. Environmental impact assessment of the proposed Information Technology Park at Perungudi.

    Science.gov (United States)

    Sharmilaa, G

    2007-10-01

    Environmental impact assessment studies of the proposed Information Technology Park at Perungudi have been carried out. The study involved assessing the existing environmental quality of the proposed site, and predicting impacts and preparing an environmental management plan. Data on the existing quality of water, soil, land use pattern, air, noise and socio-economic details of the proposed project were assessed. The impacts due to the proposed activity were identified and evaluated using the Network Impact Methodology. The water requirement was found to be 3,63,400 L/day. The total wastewater likely to be generated was found to be 2,90,720 L/day. The wastewater will be treated in a sewage treatment plant. The generation of solid waste was assessed to about 500 kg/day. Increase in traffic level was found out by traffic survey. The socio-economic environment will have a positive impact from the proposed project. An Environmental Management Plan was prepared which includes the mitigation measures for improving the eco-profile of the study area.

  10. Qualitative evaluation of environmental radiological impact in a phosphate associated uranium conventional mine: Santa Quiteria Project, CE, Brazil

    International Nuclear Information System (INIS)

    Reis, Rocio G. dos; Santo, Aline Sa E.

    2013-01-01

    The aim of this study is to identify and evaluate qualitatively the main potential sources of mineral and installation terms of Santa Quiteria, CE, Brazil, evaluating their possible impacts on the environment. The key terms sources in the production of phosphoric acid are usually: the dig of the mines, tailings dams and phospho plaster stack. Thus, this work intends to inform the academic community about this issue, as well as the population in general and also, acting proactively in order to warn about the possible environmental impacts, so that actions to compensate, minimize or avoid these radiological impacts on the environment, can be included in the planning of the industrial mineral project of Santa Quiteria (author)

  11. Hierarchical biodiversity and environment impact assessment of South-to-North Water Diversion Project of China

    OpenAIRE

    Youhua Chen

    2013-01-01

    In this brief review, the potential environmental and biodiversity impact of South-to-North Water Diversion (SNWD) project in China on regional environments was assessed. I used the hierarchical environmental impact assessment to classify the possible impacts into three orders caused by the construction of SNWD and then presented the current research advances on each order of the impacts. Further impact assessments should be reinforced during the construction period of SNDW project for the su...

  12. Attention to impact pathways in EISs of large dam projects

    International Nuclear Information System (INIS)

    Brismar, Anna

    2004-01-01

    The importance of addressing cumulative environmental impacts in Environmental Impact Statements (EISs) of large development projects is increasingly underlined. However, cumulative impacts are generated through complex impact pathways, involving multiple root causes and lower and higher order effects, interlinked by cause-effect relationships. Consideration to potential impact pathways may thus be difficult without appropriate analytical methods, expertise, and supportive Environmental Impact Assessment guidelines and terms-of-references (TOR). This paper presents the results of an analysis of six EISs prepared for large dam projects between 1994 and 2001. The objective was to analyze if, how, and to what extent potential impact pathways involved in the generation of dam-related cumulative impacts have been addressed in the analyzed material. For this purpose, a theoretical framework was developed, which identifies four key root causes, their potential effects, and associated cause-effect relationships. The analysis revealed various shortcomings. Important imbalances were found in the degree of attention given to effects of different categories. Lower order effects received greater attention than higher order, and the potential effects of reservoir filling were more extensively attended to than those of flow blockage, storage, and regulation. Most importantly, little effort was made to carefully explain the potential impact pathways involved; root causes were often referred to in general terms only, and potential pathways leading up to an anticipated higher order effect or following upon an expected lower order effect were often inadequately addressed or ignored. Probable reasons for the discovered shortcomings are discussed and recommendations are presented for improving the World Bank EIA guidelines for large dam projects

  13. Environmental impact assessment applied to planning activities

    International Nuclear Information System (INIS)

    Vismara, R.

    1994-01-01

    Object of EEC (European Economic Community) directive and italian law are certain public and private projects. However, more recent tendency are moving to an application on planning action too. There is no doubt that EIA (Environmental Impact Analysis) on project is very different than EIA on plans. Obviously EIA on a sectorial plan is not an addition of singular EIA on project. The new main objectives shall be: identification of critical areas; identification of interaction between different projects and between different factors; identification of critical project. A methodology to quantify these objectives in matricial form is presented

  14. The future impact of ICT on environmental sustainability

    Energy Technology Data Exchange (ETDEWEB)

    Wunnik, C. van; Rodriguez, C.; Delgado, L.; Burgelman, J.C.; Desruelle, P. [Inst. for Prospective Technological Studies, European Commission, DG-JRC (Spain)

    2004-07-01

    The Institute for Prospective Technology Studies commissioned a project to research the possible effects of ICT on a set of environmental indicators in 2020. The project adopted an innovative methodology combining qualitative scenario-building and quantitative modelling. The general conclusion was that the impact of ICT is roughly between -20 and +30%. It should therefore be taken into account by environmental policies in order to ensure that ICT applications make a positive contribution to environmental outcomes, and, at the same time, to suppress rebound effects. There are significant opportunities for improving environmental sustainability through ICTs, which can rationalise energy management in housing (or facilities), make passenger and freight transport more efficient, and enable a product-to-service shift across the economy. (orig.)

  15. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  16. Construction Site Environmental Impact in Civil Engineering Education

    Science.gov (United States)

    Teixeira, Jose M. Cardoso

    2005-01-01

    The environmental impact of construction activity has gained increasing importance in the last few years and become a key subject for civil engineering education. A survey of Portuguese higher education institutions shows that concern with this topic is mostly directed at the impact of large construction projects and especially focused on their…

  17. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities

  18. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  19. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  20. Environmental impact assessment and environmental audit in large-scale public infrastructure construction: the case of the Qinghai-Tibet Railway.

    Science.gov (United States)

    He, Guizhen; Zhang, Lei; Lu, Yonglong

    2009-09-01

    Large-scale public infrastructure projects have featured in China's modernization course since the early 1980s. During the early stages of China's rapid economic development, public attention focused on the economic and social impact of high-profile construction projects. In recent years, however, we have seen a shift in public concern toward the environmental and ecological effects of such projects, and today governments are required to provide valid environmental impact assessments prior to allowing large-scale construction. The official requirement for the monitoring of environmental conditions has led to an increased number of debates in recent years regarding the effectiveness of Environmental Impact Assessments (EIAs) and Governmental Environmental Audits (GEAs) as environmental safeguards in instances of large-scale construction. Although EIA and GEA are conducted by different institutions and have different goals and enforcement potential, these two practices can be closely related in terms of methodology. This article cites the construction of the Qinghai-Tibet Railway as an instance in which EIA and GEA offer complementary approaches to environmental impact management. This study concludes that the GEA approach can serve as an effective follow-up to the EIA and establishes that the EIA lays a base for conducting future GEAs. The relationship that emerges through a study of the Railway's construction calls for more deliberate institutional arrangements and cooperation if the two practices are to be used in concert to optimal effect.

  1. An Analysis of the Most Adopted Rating Systems for Assessing the Environmental Impact of Buildings

    Directory of Open Access Journals (Sweden)

    Elena Bernardi

    2017-07-01

    Full Text Available Rating systems for assessing the environmental impact of buildings are technical instruments that aim to evaluate the environmental impact of buildings and construction projects. In some cases, these rating systems can also cover urban-scale projects, community projects, and infrastructures. These schemes are designed to assist project management in making the projects more sustainable by providing frameworks with precise criteria for assessing the various aspects of a building’s environmental impact. Given the growing interest in sustainable development worldwide, many rating systems for assessing the environmental impact of buildings have been established in recent years, each one with its peculiarities and fields of applicability. The present work is motivated by an interest in emphasizing such differences to better understand these rating systems and extract the main implications to building design. It also attempts to summarize in a user-friendly form the vast and fragmented assortment of information that is available today. The analysis focuses on the six main rating systems: the Building Research Establishment Environmental Assessment Methodology (BREEAM, the Comprehensive Assessment System for Built Environment Efficiency (CASBEE, the Deutsche Gesellschaft für Nachhaltiges Bauen (DGNB, the Haute Qualité Environnementale (HQETM, the Leadership in Energy and Environmental Design (LEED, and the Sustainable Building Tool (SBTool.

  2. Analysis of environmental impact assessment for large-scale X-ray medical equipments

    International Nuclear Information System (INIS)

    Fu Jin; Pei Chengkai

    2011-01-01

    Based on an Environmental Impact Assessment (EIA) project, this paper elaborates the basic analysis essentials of EIA for the sales project of large-scale X-ray medical equipment, and provides the analysis procedure of environmental impact and dose estimation method under normal and accident conditions. The key points of EIA for the sales project of large-scale X-ray medical equipment include the determination of pollution factor and management limit value according to the project's actual situation, the utilization of various methods of assessment and prediction such as analogy, actual measurement and calculation to analyze, monitor, calculate and predict the pollution during normal and accident condition. (authors)

  3. Socio-Economical, Environmental Evaluation of Ken-Betwa River Link Project, India

    Directory of Open Access Journals (Sweden)

    Pathak Hemant

    2016-10-01

    Full Text Available The India's ambitious Rs 9,393 crore Ken-Betwa river interlinking project will impact very significantly on Socio-economic life of two million people of Bundelkhand region, India. Water is an important input for survival and sustenance of life. The demand of this natural gift has been increasing exponentially. This ambitious project will help us in irrigation, potable water, cheap transportation, electricity as well as a source of livelihood for our ever increasing population. In Bundelkhand region, there is a severe problem of lack of irrigation in one region and water logging in others. Damage to crops due to drought and pitiable drainage facility could be managed. The objectives of the paper are to study socio-economical issues and environmental challenges in Ken-Betwa River link in India and to study environmental impact of this Project.

  4. Critical factors in environmental impact assessment

    International Nuclear Information System (INIS)

    Creasey, R.

    1999-01-01

    Environmental impact assessment (EIA) has shown that it is of proven benefit to the overall planning and environmental management of resource development projects, but certain elements within the application and practice of EIA remain problematic for proponents and regulatory decision makers alike. The use of the word 'critical' in the title of this paper suggests that if the components identified are not considered or implemented properly through the process of EIA, the product will be of less value to both the proponent and decision maker. In the context of EIA, the regulatory, financial, legal and social benefits that accrue make the need for good EIA practice even more imperative. A discussion is included that highlights a number of issues that need to be addressed to improve the effectiveness of EIA, a tool necessary to attaining provincial and federal regulatory approvals. To a large extent, the discussion reflects items of contemporary public concern, and those emerging issues of the scientific and regulatory community. At the same time, it needs to be realized that not all the identified items are necessarily new to the practice of impact assessment, but are nonetheless important to professional environmental impact assessment and decision making. Insight is also provided into the direction of decision making of the Energy and Utilities Board as it will affect the regulatory review and administration of resource development projects in the province of Alberta. 16 refs

  5. Evaluation process of global environmental impact: assessment guidelines

    International Nuclear Information System (INIS)

    Memon, A.R.; Mahar, R.B.

    2001-01-01

    In developed and developing countries, the EIA (Environmental Impact Assessment) is becoming mandatory for the approval of Industrial projects and projects of Environmental hazards. The approving authority of each country has its own guidelines to get projects approved and make project proponents responsible to submit Environmental Impact Statement for the its detailed assessment. In this paper authors have studied an existing EIA Global guidelines and its evaluation process of altogether 40 countries from four continents, Asia, Pacific/Middle East, Europe, Australia and America/Canada. This evaluation process is recorded in the tabulation form and it has been formulated stage wise in which stage one highlights the inception of EIA guidelines of each country and stage two and three gives implementation process. The inception stage of guidelines gives an idea that when EIA was started and an implementation stages provide all information that when EIA become a part of legislation that provide an opportunity to the reader to understand the decision making process for project approvals. The main objective of writing EIA guidelines is to monitor the sustain ability of various types of the projects under different sectoral guidelines, therefore Projects related with different Sectors have been chosen and a detailed record in tabulation form gives an idea to understand the interaction of these guidelines. To make this paper more comprehensive, authors have gone thorough the sectoral guidelines of altogether 64 countries and studied 21 sector oriented project fields. These are of Agriculture/Irrigation, Biodiversity, Coastal/Marine, Community Participation, Extractive industries, Fisheries, Forestry, Hazard Risk, Health, Human settlement, Industry, Multi sectorial, Ports and Harbors, Power, refugees/resettlement, Social, Strategies/Planning, Tourism/Recreational, transportation, Waste Pollution and Wetlands/Water resources. (author)

  6. Large-scale renewable energy project barriers: Environmental impact assessment streamlining efforts in Japan and the EU

    International Nuclear Information System (INIS)

    Schumacher, Kim

    2017-01-01

    Environmental Impact Assessment (EIA) procedures have been identified as a major barrier to renewable energy (RE) development with regards to large-scale projects (LS-RE). However EIA laws have also been neglected by many decision-makers who have been underestimating its impact on RE development and the stifling potential they possess. As a consequence, apart from acknowledging the shortcomings of the systems currently in place, few governments momentarily have concrete plans to reform their EIA laws. By looking at recent EIA streamlining efforts in two industrialized regions that underwent major transformations in their energy sectors, this paper attempts to assess how such reform efforts can act as a means to support the balancing of environmental protection and climate change mitigation with socio-economic challenges. Thereby this paper fills this intellectual void by identifying the strengths and weaknesses of the Japanese EIA law by contrasting it with the recently revised EIA Directive of the European Union (EU). This enables the identification of the regulatory provisions that impact RE development the most and the determination of how structured EIA law reforms would affect domestic RE project development. The main focus lies on the evaluation of regulatory streamlining efforts in the Japanese and EU contexts through the application of a mixed-methods approach, consisting of in-depth literary and legal reviews, followed by a comparative analysis and a series of semi-structured interviews. Highlighting several legal inconsistencies in combination with the views of EIA professionals, academics and law- and policymakers, allowed for a more comprehensive assessment of what streamlining elements of the reformed EU EIA Directive and the proposed Japanese EIA framework modifications could either promote or stifle further RE deployment. - Highlights: •Performs an in-depth review of EIA reforms in OECD territories •First paper to compare Japan and the European

  7. Improving environmental impact and cost assessment for supplier evaluation

    Science.gov (United States)

    Beucker, Severin; Lang, Claus

    2004-02-01

    Improving a company"s environmental and financial performance necessitates the evaluation of environmental impacts deriving from the production and cost effects of corporate actions. These effects have to be made transparent and concrete targets have to be developed. Such an evaluation has to be done on a regular basis but with limited expenses. To achieve this, different instruments of environmental controlling such as LCA and environmental performance indicators have to be combined with methods from cost accounting. Within the research project CARE (Computer Aided Resource Efficiency Accounting for Medium-Sized Enterprises), the method Resource Efficiency Accounting (REA) is used to give the participating companies new insights into hidden costs and environmental effects of their production and products. The method combines process based cost accounting with environmental impact assessment methodology and offers results that can be integrated into a company"s environmental controlling system and business processes like cost accounting, supplier assessment, etc. Much of the data necessary for the combined assessment can be available within a company"s IT system and therefore can be efficiently used for the assessment process. The project CARE puts a strong focus on the use of company data and information systems for the described assessment process and offers a methodological background for the evaluation and the structuring of such data. Besides the general approach of the project CARE the paper will present results from a case study in which the described approach is used for the evaluation of suppliers.

  8. Developing guidelines for economic evaluation of environmental impacts in EIAs. Part I

    International Nuclear Information System (INIS)

    2005-01-01

    Is the time right to introduce environmental evaluation into the Environmental Impact Assessment (EIA) system for large construction projects in China? The report analyses gaps to introducing environmental evaluation into EIAs and recommend how to bridge the gaps. The report also provides suggestions to the State Environmental Protection Administration on core elements of a guideline for environmental evaluation to include in the existing EIA guidelines. The report draws on international and Chinese research and best practice and conducts four case studies of environmental evaluation based on EIAs of investment projects e.g. a power plant, a waste water treatment plant, regional waste water irrigation, and a road construction project

  9. Developing guidelines for economic evaluation of environmental impacts in EIAs. Part I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    Is the time right to introduce environmental evaluation into the Environmental Impact Assessment (EIA) system for large construction projects in China? The report analyses gaps to introducing environmental evaluation into EIAs and recommend how to bridge the gaps. The report also provides suggestions to the State Environmental Protection Administration on core elements of a guideline for environmental evaluation to include in the existing EIA guidelines. The report draws on international and Chinese research and best practice and conducts four case studies of environmental evaluation based on EIAs of investment projects e.g. a power plant, a waste water treatment plant, regional waste water irrigation, and a road construction project.

  10. A Contribution to the Built Heritage Environmental Impact Assessment

    Science.gov (United States)

    Žarnić, R.; Rajčić, V.; Skordaki, N.

    2015-08-01

    The understanding and assessment of environmental impact on heritage assets is of the highest importance for heritage preservation through well-organized maintenance based on proper decision-making. The effort towards development of protocol that would enable comparison of data on heritage assets in Europe and Mediterranean countries was done through EU Project European Cultural Heritage Identity Card. The special attention was paid to classification of environmental and man-induced risks to heritage. In the present paper the idea of EU CHIC is presented. Environmental risks are discussed in context of their influence on structure of heritage buildings that are exposed to sudden environmental impacts.

  11. Cost-effectiveness evaluation of alternatives in environmental impact statements

    International Nuclear Information System (INIS)

    Weiser, A.L.

    1977-01-01

    Although it has been Federal government officials who have been accused in courts of law with mismanagement with regard to the consideration of alternatives in the environmental impact statement, the responsibility for systematically considering all alternatives to a proposed project remains with project decisionmakers in the Federal, state, or local levels of government and in industry. By applying the techniques of system cost-effectiveness analysis to the assessment of alternatives, it is believed that management will be able to clearly demonstrate that the selection of the proposed approach was neither arbitrary nor capricious. A rational approach to the assessment of alternatives should aid in meeting the mandates of environmental legislation and EIS guidelines, and it should eliminate the merit of any plaintiff's charge of mismanagement with regard to management's consideration of alternatives. Even though many interfaces between the proposed system and the environment cannot as yet be objectively quantified, application of CE techniques will demonstrate that a rigorous exploration and objective evaluation has been applied to the consideration of alternatives with respect to project objectives, financial conditions, and adverse environmental impacts

  12. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  13. Review report 2003. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-09-15

    The present review report presents the two wind farms Homs Rev and Nysted, with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on methods, programmes and conclusions can be found in these reports. This review report is divided into two parts. The first part contains a description of the potential environmentally impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Hors Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated at the bdsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  14. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  15. Can environmental impact assessments alone conserve freshwater fish biota? Review of the Chilean experience

    International Nuclear Information System (INIS)

    Lacy, Shaw Nozaki; Meza, Francisco J.; Marquet, Pablo A.

    2017-01-01

    Chile was one of many countries that initiated environmental impact assessments in the 1990s, and has relied on their use for species conservation and territorial planning without the use of larger-scale environmental and ecological planning. The capacity of Chile's environmental impact assessment system (SEIA) to evaluate resident freshwater fishes and the potential impacts of water projects and aquaculture activities – two categories of projects that create direct threats to freshwater fishes – are assessed. Of the 3997 such submissions to the SEIA, only 0.6% conducted any freshwater fish assessment, and only 0.1% conducted any quantitative assessment of expected impacts from the associated project. The small number of assessments was characterized by poor study design, inconsistent sampling methodology, and species misidentification. Traditional assessments failed to include freshwater fish ecology in the general assessment framework. The new strategic environmental evaluation system only underscores the need for vastly improved field sampling protocols and assessment methodologies.

  16. Can environmental impact assessments alone conserve freshwater fish biota? Review of the Chilean experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, Shaw Nozaki, E-mail: shaw.lacy@gmail.com [Departamento de Ecología, Facultad de Ciencias Biológicas, Pontificia Universidad Católica de Chile, Alameda 340, Santiago (Chile); Departmento de Ecosistemas y Medio Ambiente, Pontificia Universidad Católica de Chile, Vicuña Mackenna 4860, Macul (Chile); Centro Interdisciplinario de Cambio Global, Vicuña Mackenna 4860, Macul (Chile); Meza, Francisco J. [Departmento de Ecosistemas y Medio Ambiente, Pontificia Universidad Católica de Chile, Vicuña Mackenna 4860, Macul (Chile); Centro Interdisciplinario de Cambio Global, Vicuña Mackenna 4860, Macul (Chile); Marquet, Pablo A. [Departamento de Ecología, Facultad de Ciencias Biológicas, Pontificia Universidad Católica de Chile, Alameda 340, Santiago (Chile); Instituto de Ecología y Biodiversidad, Las Palmeras 345, Santiago (Chile); Centro Interdisciplinario de Cambio Global, Vicuña Mackenna 4860, Macul (Chile)

    2017-03-15

    Chile was one of many countries that initiated environmental impact assessments in the 1990s, and has relied on their use for species conservation and territorial planning without the use of larger-scale environmental and ecological planning. The capacity of Chile's environmental impact assessment system (SEIA) to evaluate resident freshwater fishes and the potential impacts of water projects and aquaculture activities – two categories of projects that create direct threats to freshwater fishes – are assessed. Of the 3997 such submissions to the SEIA, only 0.6% conducted any freshwater fish assessment, and only 0.1% conducted any quantitative assessment of expected impacts from the associated project. The small number of assessments was characterized by poor study design, inconsistent sampling methodology, and species misidentification. Traditional assessments failed to include freshwater fish ecology in the general assessment framework. The new strategic environmental evaluation system only underscores the need for vastly improved field sampling protocols and assessment methodologies.

  17. Environmental impact statements: Nuclear-industry waste-disposal and isotope-separation projects. (Latest citations from the NTIS data base). Published Search

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    The bibliography contains citations concerning draft and final impact statements relating to environmental radiation hazards. Prepared by the Department of Energy (DOE), Nuclear Regulatory Commission, Oak Ridge National Laboratory, and others, these reports examine environmental data affecting DOE decisions on proposed construction and decommissioning of nuclear power plants, radioactive waste disposal facilities and sites, and isotope separation projects. The effects of Federal guidelines and atomic facility location on community awareness is briefly mentioned. (Contains a minimum of 120 citations and includes a subject term index and title list.)

  18. Participation of the public in the licensing of large-scale projects with environmental impact - theoretical framework and project conceptual outline

    International Nuclear Information System (INIS)

    Bechmann, G.; Gloede, F.

    1989-01-01

    The paper discusses the dimensions and environmental impacts of large-scale projects, and public participation as an element of institutionalized problem management. The legal protection functions, the administrative and socio-political functions are subsumed under a concept of function which defines a function as a synthesis of a variety of possibilities, so that different 'achievements' are expected from public participation, depending on the reference system chosen for comparison. The paper explains the purpose of the examination of public participation and its functions, the design of analytical procedure which covers the three main stages of 'input, legal procedure, output', and instruments and aspects such as interdisciplinarity, representativity, comparison, relation between empirical research and the principles of the law. (HSCH) [de

  19. Concept development for an environmental impact assessment for off-shore wind parks in the Baltic States. Project November 2007 - October 2009. Final report. Advisory assistance programme for environmental protection in the countries of Central and Eastern Europe, the Caucasus and Central Asia

    Energy Technology Data Exchange (ETDEWEB)

    Fammler, Heidrun; Kuris, Merle [Baltic Environmental Forum, Riga (Latvia)

    2010-12-15

    This is the final report of the project ''Concept development for an environmental impact assessment for off-shore wind parks in the Baltic States'', which was co-funded by the German Environmental Agency (project No 380 01 173). The main outcomes of the project are: - The ''Guidelines for the investigation of the impacts of offshore wind farms on the marine environment in the Baltic States'' developed by the Baltic Environmental Forum and German consultant Dr. Jan Kube in consultation with experts from Estonia, Latvia and Lithuania. The guidelines give an overview on potential negative impacts of offshore wind farms on the marine environment and general EIA and monitoring requirements as well as give detailed guidance on methodology for relevant field investigations. - The background paper ''Legal frame for the use of offshore wind energy in Germany'' prepared by RA'in Dr. Ursula Prall (April 2009) - 3 international workshops on different aspects related to establishment of offshore wind farms and assessment of their environmental impacts. (orig.)

  20. Environmental impact assessment of some aspects of an alcohol distillery industry

    International Nuclear Information System (INIS)

    Khanum, F.; Khan, M.A.

    2005-01-01

    The paper on Environmental Impact Assessment of an Alcohol Distillery was carried to assess the type of impacts that could be produced by an alcohol industry on the environment and economics of the selected area. Baseline studies were done for project location and boundaries, physiography, soil profile, climate, water resources, ecological resources, air quality, noise level, archeological resources and socio- economic impacts. Checklist was prepared for identification of possible Environmental Impacts of the project, at constructional and operational levels and was marked as no significant impact, small impact, moderate impact and major impact. From various available data it was observed that Sargodha district is an arid area and Alcohol distillery considered as best for using the sugar industrial raw materials i.e., molasses. The observations showed that before installation of alcohol industry there was no hazardous air emissions and noise problems. By discussing the checklist it was concluded that proposed project would not result in any significant damage to the community or the environment if the recommended mitigation measures are adopted. So in that way we develop a sustainable industrial sector by doing EIA and implementing it. (author)

  1. Environmental impact of coal utilization (from raw material to waste resources): Proceedings

    International Nuclear Information System (INIS)

    Sahu, K.C.

    1991-10-01

    The proceedings contains 27 papers presented at the conference on environmental impact of coal utilization from raw material to waste resources which was held at the Indian Institute of Technology, Bombay, during 14-15 January 1991. The conference was held as a follow-up of the research project to study the impact of coal utilization. The project was undertaken jointly by the Indian Institute of Technology, Bombay and the University of Western Ontario, Canada. The project was funded by the International Development Research Centre, Ottawa (Canada). The principle themes of the conference were : occurrence of trace elements in coal, fate of trace elements during combustion of coal, characterisation of fly ash and its properties and utilization, and environmental impact of ash disposal. (M.G.B.)

  2. Ecological compensation and Environmental Impact Assessment in Spain

    International Nuclear Information System (INIS)

    Villarroya, Ana; Puig, Jordi

    2010-01-01

    To achieve meaningful sustainable development, Environmental Impact Assessment (EIA) should avoid the net losses in the environment resource base. But EIA practice does not always avoid the losses caused by the implementation of the projects under EIA regulation. Some environmental impacts are, simply, admitted, even without enforcing any form of compensation. When applied, compensation is sometimes just a monetary payment to offset the environmental loss. This paper looks for evidence on the role that compensation is given at present in EIA practice in Spain, and for some of its conceptual and regulatory roots. Specifically, it explores how compensation is addressed in 1302 records of decision (RODs) on those projects subject to the Spanish EIA regulation published during the years 2006 and 2007, to know how far Spain is from preserving the environmental resource base managed through this particular aspect of EIA practice. As a result, it is concluded that the practice of ecological compensation in EIA in Spain is much lower than it could be expected in a theoretical sustainability context committed to avoid net losses in the environment resource base, mainly due to an EIA practice focused on on-site mitigation that allows these net losses.

  3. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 3: Chapters 5 through 7

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains chapters 5--7 of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. Attention is focused on the effects of oil on the physical, biological, and human environments

  4. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  5. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  6. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  7. Energy and environmental quality: case histories of impact management

    International Nuclear Information System (INIS)

    1981-06-01

    A discussion of energy source devlopments and environmental protection dealing with impacts, and legal aspects of pollution controls and resource management, and case history studies of major energy projects is presented

  8. 76 FR 13396 - Notice of Availability of the Draft Environmental Impact Statement for the Mountaineer Commercial...

    Science.gov (United States)

    2011-03-11

    ... DEPARTMENT OF ENERGY Notice of Availability of the Draft Environmental Impact Statement for the... potential environmental impacts of a project proposed by American Electric Power (AEP) Service Corporation...) announces the availability of the Draft Environmental Impact Statement for the Mountaineer Commercial Scale...

  9. Bibliography of documents and related materials collected for the Hawaii Geothermal Project Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, F.M.; Boston, C.R.; Burns, J.C.; Hagan, C.W. Jr.; Saulsbury, J.W.; Wolfe, A.K.

    1995-03-01

    This report has been prepared to make available and archive information developed during preparation of the Environmental Impact Statement for Phases 3 and 4 of the Hawaii Geothermal Project as defined by the state of Hawaii in its April 1989 proposal to Congress. On May 17, 1994, the USDOE published a notice in the Federal Register withdrawing its Notice of Intent of February 14, 1992, to prepare the HGP EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This report provides a bibliography of documents, published papers, and other reference materials that were obtained or used. The report provides citations for approximately 642 documents, published papers, and other reference materials that were gathered to describe the potentially affected environment on the islands of Hawaii, Maui, and Oahu. The listing also does not include all the reference materials developed by support subcontractors and cooperating agencies who participated in the project. This listing does not include correspondence or other types of personal communications. The documents listed in this report can be obtained from original sources or libraries.

  10. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  11. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  12. Assessing the environmental impacts of work zones in arterial improvement projects.

    Science.gov (United States)

    2014-12-01

    Preservation treatments help in extending the remaining service lives of pavements, but at the same time, they : may have substantial environmental impacts due to the acquisition of raw materials, transportation of the extracted : materials, manufact...

  13. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat County (Wash.)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

  14. Environmental agreements in Canada : Aboriginal participation, EIA follow-up and environmental management of major projects

    Energy Technology Data Exchange (ETDEWEB)

    O' Faircheallaigh, C. [Griffith Univ., Brisbane (Australia). Dept. of Politics and Public Policy

    2006-05-15

    Attempts are now being made to address the historic marginalization of indigenous peoples from the management of resource projects located on their ancestral lands through the use of environmental agreements. However, the rapid pace of resource development in certain regions of Canada has meant that there is an increased need to ensure effective follow-up procedures for Environmental Impact Assessment (EIA) processes in order to achieve meaningful Aboriginal participation in the management of large-scale resource projects. Lack of effective follow-up has made it difficult for the relevant agencies to manage risks and uncertainties. This book discussed the use of new policy environmental agreements between industry, government, and Aboriginal peoples. Case studies where environmental agreements were used in the Northwest Territories, Alberta, and Newfoundland were presented in order to demonstrate their efficacy. It was concluded that structures and processes must be designed to encourage Aboriginal participation in consultation processes. refs., tabs.

  15. Dynamic simulation applied to the socio-environmental management in projects of concentrated infrastructure

    International Nuclear Information System (INIS)

    Diaz E, Mauricio; Pena Z, Gloria Elena

    2004-01-01

    This work presents a theoretical and methodological approach to system dynamics utilization to contribute in the comprehension and handle of complexly of management challenges what appears in design, construction and operation phases in concentrate infrastructure projects like as ports, big dams and industrial parks. The localization of this kind of projects generates socio environmental impacts in their influence zones, what requires a strategically management from enterprise owners, not only for to comply with current environmental laws but also ensure social viability of their projects

  16. Preliminary assessment of the environmental and health impacts of nuclear and coal fuel cycles

    International Nuclear Information System (INIS)

    Yang Yin; Chen Zhuzhou; Pan Ziqiang

    1992-01-01

    The paper reports on the environmental impacts and health effects of coal and nuclear fuel cycles in China. Data of interest for China are presented in a comparative manner; epidemiological investigations in Shanxi province indicate that the incidences of chronic pulmonary diseases and infant cogenital malformation were apparently increased over the fall-out areas of coal-fired power stations and coal mines. The authors outline the framework of a research project on environmental assessment of nuclear energy and other energy systems. The main features of the project are: environmental and health impacts of coal and nuclear fuel cycles, environmental impact assessment of coal transportation, cost accounting of nuclear and other energy sources, health risk assessment. (author). 24 refs, 4 tabs

  17. Medical Isotopes Production Project: Molybdenum-99 and related isotopes - environmental impact statement. Volume II, comment response document

    International Nuclear Information System (INIS)

    1996-04-01

    This Environmental Impact Statement (EIS) provides environmental and technical information concerning the U.S. Department of Energy's (DOE) proposal to establish a domestic source to produce molybdenum-99 (Mo-99) and related isotopes (iodine-131, xenon-133, and iodine-125). Mo-99, a radioactive isotope of the element molybdenum, decays to form metastable technetium-99 (Tc-99m), a radioactive isotope used thousands of times daily in medical diagnostic procedures in the U.S. Currently, all Mo-99 used in the U.S. is obtained from a single Canadian source. DOE is pursuing the Medical Isotopes Production Project in order to ensure that a reliable supply of Mo-99 is available to the U.S. medical community as soon as practicable. Under DOE's preferred alternative, the Chemistry and Metallurgy Research Facility at the Los Alamos National Laboratory (LANL) and the Annular Core Research Reactor and Hot Cell Facility at Sandia National Laboratories/New Mexico (SNL/NM) would be used for production of the medical isotopes. In addition, three other reasonable alternatives and a No Action alternative are analyzed in detail, The sites for these three reasonable alternatives are LANL, Oak Ridge National Laboratory (ORNL), and Idaho National Engineering Laboratory (INEL). The analyses in this EIS indicate no significant difference in the potential environmental impacts among the alternatives. Each of the alternatives would use essentially the same technology for the production of the medical isotopes. Minor differences in environmental impacts among alternatives relate to the extent of activity necessary to modify and restart (as necessary) existing reactors and hot cell facilities at each of the sites, the quantities of low-level radioactive waste generated, how such waste would be managed, and the length of time needed for initial and full production capacity. This document contains comments recieved from meetings held regarding the site selection for isotope production

  18. Environmental assessment for Mound Plant decontamination and decommissioning projects, Mound Plant, Miamisburg, Ohio

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) for seven decontamination and decommissioning (D ampersand D) projects at the Mound Plant in Miamisburg, Ohio, that have not been previously addressed in the Final Environmental Impact Statement for the Mound Facility (June 1979). Based on the information presented in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI)

  19. Social impact assessment in energy projects

    International Nuclear Information System (INIS)

    Koivujaervi, S.; Kantola, I.; Maekinen, P.

    1998-01-01

    The research report is based on literature and interviews on the social impact assessment (SIA) in energy projects in Finland, both before and after the EIA Act has been in force in Finland. The concept and content of SIA, the requirements set by the legislation, its relation with other environmental impacts, the assessment process and the used methods have been studied on the basis of the literature analysis. A total of 26 persons representing the coordination authorities, persons issuing statements, researchers, civil servants, consultants and project developers were interviewed for the research. The interviews were made by the University of Turku in the form of theme interviews, investigating the present status, practices and expectations of the SIA. The unestablished status was seen to be the problem in the SIA, which was reflected in the interviewers' varying views about the content of the SIA. Among the operators, the general character of the SIA criticism in the statements concerning the assessment programmes or reports was seen as a problem as well; the assessment of social impact has been considered to be insufficient, however, without any identification of the effects or how the effects should have been assessed. For the time preceding the EIA Act, the assessment of the social impact of hydraulic work, power plant and transmission line projects and the project of the fifth nuclear power plant have been studied. As to the power plant and transmission line projects after the validity of the EIA Act, all the 20 projects were gone through which had progressed during the spring 1998 at least to the assessment report stage. Of these projects, the assessment of the social impact of one transmission line and one power plant project was studied in detail. The report also studies the assessment of the social impact of the repository for nuclear waste on the basis of the experience gained in Finland and in other countries. On the basis of the literature study

  20. Analysis and assessment of environmental impacts of small hydro power plant in Slovakia

    Science.gov (United States)

    Zeleňáková, M.; Fijko, R.; Remeňáková, I.

    2017-10-01

    Environmental impact assessment (EIA) is an important process that, prior to approval of the investment plan, can provide a detailed examination of the likely and foreseeable impacts of proposed construction activity on the environment. The objective of this paper is to apply a specific methodology for the analysis and evaluation of the environmental impacts of selected constructions, namely, small hydro power plant, using matrix of impacts. This analysis method is intended not only to increase the clarity and precision of the evaluation process, but also to align it with the requirements of the environmental impact assessment system. This modification should improve the reliability of the environmental impact assessment, and could moreover also be applied to other infrastructure projects. Comparison of alternatives and designation of the optimal variant are implemented based on selected criteria that objectively describe the characteristic lines of the planned alternatives of activity and their impact on the environment. The use of proper EIA procedures can help the decision-makers to formulate proper activities based on qualified decisions. The designed project in Spišské Bystré, Slovakia is used as a case study to clarify and exemplify the methodology and techniques.

  1. Forecast of environmental impact in the evaluation of Cerro Solo nuclear mine

    International Nuclear Information System (INIS)

    Gallucci, A.R.

    1993-01-01

    This work presents a project for the study of the environmental impact of the Cerro Solo uranium mine. The survey is to be carried out performing different kinds of studies: mineralization, tectonics, hydrogeology, preliminary studies on different exploitation methods, costs, reserves estimation, economical studies and preliminary studies on possible environmental impacts. (author). 24 refs., 1 fig., 1 tab

  2. Risk and environmental impact assessment: nuclear and environmental licensing interface

    International Nuclear Information System (INIS)

    Costa, Eduardo M.; Monteiro, Iara A.

    1997-01-01

    The main aims of this paper are the identification and discussion of interfaces and application of common concepts in the existing nuclear and environmental licensing procedures. Risk and impact assessment of nuclear electricity generation are two of these concepts which are discussed detail. The risk concept, which had initially focused on engineering projects, has been extended to many other areas of human activity. Risk resulting from the use of ionization radiation has been associated to the dose for the critical members of the public. Therefore, radiation protection applies basic dose limits which are established in national and international recommendations. These recommendations are increasing the emphasis to keep all the exposures to ionizing radiation as low as reasonable achievable, economical and social factors being taken into account. On the other hand, environmental impact assessment has been used as a tool in planning and decision-making processes, thus including environmental concern in the discussion of social and economical development strategies. This paper aims to discuss the association of these two concepts by presenting the procedures of control of radiological impact during normal operation of a nuclear power plant and the various forms of risk communication to the public in the case of events occurrence. (author). 13 refs

  3. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  4. The decision on the application to carry out a decommissioning project at Hinkley Point A Power Station under the Nuclear Reactors (Environmental Impact Assessment for Decommissioning) Regulations 1999

    International Nuclear Information System (INIS)

    2003-01-01

    European Council Directive 85/337/EEC, as amended by Council Directive 97/1 I/EC, sets out a framework on the assessment of the effects of certain public and private projects on the environment. The Directive is implemented in Great Britain for decommissioning nuclear reactor projects by the Nuclear Reactors (Environmental Impact Assessment for Decommissioning) Regulations 1999. The intention of the Directive and Regulations is to involve the public through consultation in considering the potential environmental impacts of a decommissioning project, and to make the decision-making process on granting consent open and transparent. The Regulations require the licensee to undertake an environmental impact assessment, prepare an environmental statement that summarises the environmental effects of the project, and apply to the Health and Safety Executive (HSE) for consent to carry out a decommissioning project. There is an optional stage where the licensee may request from HSE an opinion on what the environmental statement should contain (called a pre-application opinion). The licensee of Hinkley Point A Power Station, Magnox Electric pie, requested a pre-application opinion and provided information in a scoping report in December 2000. HSE undertook a public consultation on the scoping report and provided its pre- application opinion in April 2001. The licensee applied to HSE for consent to carry out a decommissioning project and provided an environmental statement in December 2001. Following a public consultation on the environmental statement, HSE requested further information that was subsequently provided by the licensee. A further public consultation was undertaken on the further information that ended in March 2003. All these public consultations involved around 60 organisations. HSE granted consent to carry out a decommissioning project at Hinkley Point A Power Station under the Regulations in July 2003, and attached conditions to the Consent. HSE took relevant

  5. Bear Creek Project. Final environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Bear Creek Project consists of certain mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from nine known ore bodies will take place over a period of ten years (estimated); a mill with a nominal capacity of 1000 tons per day of ore will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 1000 tons per day, will be stored onsite in an impoundment. Environmental impacts and adverse effects are summarized

  6. Environmental Impact Assessment in the marine environment: A comparison of legal frameworks

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Flávia, E-mail: f.c.diasguerra@vu.nl [Institute for Environmental Studies, VU University Amsterdam, De Boelelaan 1087, 1081 HV Amsterdam (Netherlands); Liga para a Protecção da Natureza, 1500-124 Lisboa (Portugal); Grilo, Catarina [Liga para a Protecção da Natureza, 1500-124 Lisboa (Portugal); Pedroso, Nuno M. [Laboratório de Ecologia Isotópica — CENA, Universidade de São Paulo, Caixa Postal 96, 13416-000 Piracicaba, SP (Brazil); Centre for Ecology, Evolution and Environmental Changes — cE3c, Faculdade de Ciências, Universidade de Lisboa, 1749-016 Lisboa (Portugal); Cabral, Henrique [MARE — Marine and Environmental Sciences Centre, Faculdade de Ciências, Universidade de Lisboa, 1749-016 Lisboa (Portugal)

    2015-11-15

    Environmental Impact Assessment (EIA) is a well-established practice in most developed countries, even though its application to projects in the marine environment is at a much earlier stage of development. We use the Portuguese example to address marine EIA legislation since its exclusive economic zone (EEZ) is currently the third largest in the European Union and its EIA legislation does not require various offshore activities with potentially negative environmental impacts to undergo EIA before being licensed. This paper aims to determine whether three types of projects implemented within Portuguese maritime zones – artificial reefs using sunken ships, hydrocarbon prospecting and wave-energy generation – would benefit from application of an appropriately designed EIA. We have conducted a structured review of EIA legal provisions from seven other countries, and considered whether a full EIA was required for each project type. Consequently, 12 Environmental Impact Statements (EIS) have been compared to identify patterns of (dis)similarity across countries and project types. Additionally, we identified key descriptors and predicted impacts for each project type referred to in their EIS. The main conclusion is that ultimately all three projects would benefit from mandatory EIA in Portugal. This paper is relevant for countries with large maritime areas and underdeveloped marine EIA legislation, helping improve international policy-making relating to these three types of marine projects. - Highlights: • EIA is not mandatory for some project types developed in Portuguese maritime zones. • Artificial reefs, oil&gas prospecting and wave-energy licensing differ in 8 countries. • EIA should be mandatory in Portugal for artificial reefs and oil&gas prospecting. • However, an AEInc approach is enough for wave-energy projects in Portugal. • Findings could be extended to other EU countries with extensive maritime zones.

  7. Environmental Impact Assessment in the marine environment: A comparison of legal frameworks

    International Nuclear Information System (INIS)

    Guerra, Flávia; Grilo, Catarina; Pedroso, Nuno M.; Cabral, Henrique

    2015-01-01

    Environmental Impact Assessment (EIA) is a well-established practice in most developed countries, even though its application to projects in the marine environment is at a much earlier stage of development. We use the Portuguese example to address marine EIA legislation since its exclusive economic zone (EEZ) is currently the third largest in the European Union and its EIA legislation does not require various offshore activities with potentially negative environmental impacts to undergo EIA before being licensed. This paper aims to determine whether three types of projects implemented within Portuguese maritime zones – artificial reefs using sunken ships, hydrocarbon prospecting and wave-energy generation – would benefit from application of an appropriately designed EIA. We have conducted a structured review of EIA legal provisions from seven other countries, and considered whether a full EIA was required for each project type. Consequently, 12 Environmental Impact Statements (EIS) have been compared to identify patterns of (dis)similarity across countries and project types. Additionally, we identified key descriptors and predicted impacts for each project type referred to in their EIS. The main conclusion is that ultimately all three projects would benefit from mandatory EIA in Portugal. This paper is relevant for countries with large maritime areas and underdeveloped marine EIA legislation, helping improve international policy-making relating to these three types of marine projects. - Highlights: • EIA is not mandatory for some project types developed in Portuguese maritime zones. • Artificial reefs, oil&gas prospecting and wave-energy licensing differ in 8 countries. • EIA should be mandatory in Portugal for artificial reefs and oil&gas prospecting. • However, an AEInc approach is enough for wave-energy projects in Portugal. • Findings could be extended to other EU countries with extensive maritime zones

  8. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    International Nuclear Information System (INIS)

    Beranich, S.J.

    1994-01-01

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed for mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process

  9. 76 FR 40390 - Notice of Availability of a Draft Land Use Plan Amendment, Environmental Impact Statement and...

    Science.gov (United States)

    2011-07-08

    ... Environmental Impact Report for the Pattern Energy Group Ocotillo Express Wind Energy Project, Imperial County... Statement (EIS) and Draft Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Project...: For further information and/or to have your name added to our mailing list, contact Cedric Perry, BLM...

  10. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  11. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  12. Household environmental monitoring project, volume I : main report, volume 2 : appendices

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, J.; Goemans, M.; Goemans, P.C.; Wisniowski, A. [Jane Thompson Architect, Ottawa, ON (Canada); Fugler, D. [Canada Mortgage and Housing Corp., Ottawa, ON (Canada)

    2006-01-15

    Environmentally sustainable behaviour can be motivated by providing homeowners with a clear picture of their environmental impact, tangible reasons for improvement, and tailored solutions. This report presented the results of a study that established a study group of 20 households in an 85-year old community near downtown Ottawa, Ontario to test the above hypothesis. Each household completed surveys about environmental attitudes and household practices. Each household also tracked home heating, electricity and water consumption, and vehicle usage and waste generation over a monitoring period of one week. This report described the study in detail and presented the research plan and methods. It provided a review of related literature, including motivational techniques for encouraging sustainable behaviour; environmental monitoring tools including design tools, global impact assessment tools, federal environmental reduction tools and strategies; analyses of environmentally sustainable projects; and resource conservation techniques and manuals. The report also discussed the selection of the study group; development of monitoring method and forms; household monitoring; household assessment and reporting; community initiatives; and assessment of following year results. It was concluded that the research technique successfully produced reductions in environmental impact among the study group. refs., tabs., figs.

  13. Strategic planning at the national level: Evaluating and ranking energy projects by environmental impact

    International Nuclear Information System (INIS)

    Thorhallsdottir, Thora Ellen

    2007-01-01

    A method for evaluating and ranking energy alternatives based on impact upon the natural environment and cultural heritage was developed as part of the first phase of an Icelandic framework plan for the use of hydropower and geothermal energy. The three step procedure involved assessing i) site values and ii) development impacts within a multi-criteria analysis, and iii) ranking the alternatives from worst to best choice from an environmental-cultural heritage point of view. The natural environment was treated as four main classes (landscape + wilderness, geology + hydrology, species, and ecosystem/habitat types + soils), while cultural heritage constituted one class. Values and impacts were assessed within a common matrix with 6 agglomerated attributes: 1) diversity, richness, 2) rarity, 3) size (area), completeness, pristineness, 4) information (epistemological, typological, scientific and educational) and symbolic value, 5) international responsibility, and 6) scenic value. Standardized attribute scores were used to derive total class scores whose weighted sums yielded total site value and total impact. The final output was a one-dimensional ranking obtained by Analytical Hierarchical Process considering total predicted impacts, total site values, risks and uncertainties as well as special site values. The value/impact matrix is compact (31 cell scores) but was considered to be of sufficient resolution and has the advantage of facilitating overview and communication of the methods and results. The classes varied widely in the extent to which value assessments could be based on established scientific procedures and the project highlighted the immense advantage of an internationally accepted frame of reference, first for establishing the theoretical and scientific foundation, second as a tool for evaluation, and third for allowing a global perspective

  14. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  15. 78 FR 75370 - Draft Supplemental Environmental Assessment and Finding of No Significant Impact for Flood...

    Science.gov (United States)

    2013-12-11

    ... Environmental Assessment and Finding of No Significant Impact for Flood Control Improvements to the Rio Grande... Supplemental Environmental Assessment (SEA) and Finding of No Significant Impact (FONSI). SUMMARY: Pursuant to... Significant Impact for Flood Control Improvements to the Rio Grande Canalization Project in Vado, New Mexico...

  16. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  17. Washington wildlife mitigation projects. Final programmatic environmental assessment and finding of no significant impact

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities

  18. Final Environmental Statement related to the operation of WPPSS Nuclear Project No. 3 (Docket No. 50-508)

    International Nuclear Information System (INIS)

    1985-05-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the Washington Public Power System Nuclear Project No. 3 (WNP-3) pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs. Land use and terrestrial and aquatic resource impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial

  19. DESIGNING A MANAGEMENT MODEL FOR ACHIEVING ECONOMIC-ENVIRONMENTAL BALANCE IN INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Frantescu Marius

    2010-12-01

    Full Text Available This paper describes a method for achieving the economic-environmental balance based on the assessment of environmental and/or pollutant factors in connection to community option on the evaluation of investment projects having a major impact on environment. This assessment is based on the concept of welfare, the distinction between satisfaction and dissatisfaction and implies a practical approach including the scientific aspects of environment pollution degree and the community position on developing an investment project, by assuming responsibility for negative and positive aspects of such a project, respectively for satisfaction and dissatisfaction, in order to fulfill the supreme goal of preserving the environment and ensuring human welfare.

  20. Billy Shaw Dam and Reservoir: Environmental assessment and finding of no significant impacts

    International Nuclear Information System (INIS)

    1997-03-01

    This notice announces BPA's decision to fund the construction, operation, and maintenance of the Billy Shaw Dam and Reservoir on the Duck Valley Reservation. This project is part of a continuing effort to address system-wide fish and wildlife losses caused by the development of the hydropower system in the Columbia River Basin. BPA has prepared an Environmental Assessment (EA) evaluating the potential environmental impacts of the proposed project. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  1. Proposed Columbia Wind Farm number-sign 1. Joint NEPA/SEPA draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm number-sign 1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue

  2. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  3. Benchmarking performance: Environmental impact statements in Egypt

    International Nuclear Information System (INIS)

    Badr, El-Sayed A.; Zahran, Ashraf A.; Cashmore, Matthew

    2011-01-01

    Environmental impact assessment (EIA) was formally introduced in Egypt in 1994. This short paper evaluates 'how well' the EIA process is working in practice in Egypt, by reviewing the quality of 45 environmental impact statements (EISs) produced between 2000 and 2007 for a variety of project types. The Lee and Colley review package was used to assess the quality of the selected EISs. About 69% of the EISs sampled were found to be of a satisfactory quality. An assessment of the performance of different elements of the EIA process indicates that descriptive tasks tend to be performed better than scientific tasks. The quality of core elements of EIA (e.g., impact prediction, significance evaluation, scoping and consideration of alternatives) appears to be particularly problematic. Variables that influence the quality of EISs are identified and a number of broad recommendations are made for improving the effectiveness of the EIA system.

  4. The environmental impact assessment of uranium mining in Australia

    International Nuclear Information System (INIS)

    Morvell, G.

    2002-01-01

    Federal environmental impact assessment legislation has existed in Australia since 1974. A number of uranium mines have been developed in this time, utilizing a range of mining techniques, including opencut, underground and in-situ leach. Projects have also been undertaken in a variety of geographical areas requiring consideration of diverse biodiversity, cultural heritage and social impact issues. Assessment of uranium mining proposals in Australia is also conducted in a climate of political opposition from a cross section of the Australian community. This paper outlines some of the key issues that arose during recent assessments and which provide a lead to the role of environmental impact assessment in environmental policy development. Issues are also relevant to recent assessments on a replacement nuclear reactor, shipments of waste for reprocessing and proposed assessments on proposals for low and intermediate level nuclear waste facilities. (author)

  5. The quality of environmental impact reports for explosive industry projects in South Africa / Felicity van der Vyver

    OpenAIRE

    Van der Vyver, Felicity Brunesia

    2008-01-01

    Environmental Impact Assessment (EIA) is a process that seeks to reduce the negative environmental consequences of listed development activities, which could have a detrimental effect on the environment, in the advance of their implementation, and a requirement of legislation in South Africa. An important element of the systematic EIA process is the submission of an environmental impact or scoping report or an environmental impact report (EIR) to the relevant governmental department, interest...

  6. 10 CFR 51.29 - Scoping-environmental impact statement and supplement to environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Environmental Policy Act-Regulations Implementing Section 102(2) Scoping § 51.29 Scoping-environmental impact...

  7. Assessment of environmental projects in official schools in the locality 18 in Bogota

    International Nuclear Information System (INIS)

    Herrera R, Juan Francisco; Reyes S, Lucia; Amaya, Hector Oswaldo T .Gerena Oscar Arturo

    2006-01-01

    It was investigated the current state of de School Environment Projects in the public educational institutions of de Town 18 Rafael Uribe Uribe in Bogota (Colombia). The participation grade was measured in the design o execution and evaluation of the environmental projects, the registration and systematising of experiences, the generation of reflection spaces and the structuring to the Institutional Educational Project. By means of the test pilot the variables were determined for the sample design and the validation of the mensuration instrument. Three populations study object were determined and for each was designed a for through which the information of the variable was gathered by means of the method of direct interview. The results show that the overwhelming majority of the considered population didn't participated in the design in the execution of the environmental projects. The registration and systematizing of experiences are minimum, as well as the reflection spaces and conceptualization. There is not articulation from the environmental project to the Institutional Educational Project. The little participation, systematizing of experiences and lack of reflection spaces and conceptualization limit the impact of the School Environmental Projects in the formation of favorable attitudes to the environment

  8. Renewable biomass energy: Understanding regional scale environmental impacts

    Energy Technology Data Exchange (ETDEWEB)

    Graham, R.L.; Downing, M.

    1993-12-31

    If biomass energy is to become a significant component of the US energy sector, millions of acres of farmland must be converted to energy crops. The environmental implications of this change in land use must be quantitatively evaluated. The land use changes will be largely driven by economic considerations. Farmers will grow energy crops when it is profitable to do so. Thus, models which purport to predict environmental changes induced by energy crop production must take into account those economic features which will influence land use change. In this paper, we present an approach for projecting the probable environmental impacts of growing energy crops at the regional scale. The approach takes into account both economic and environmental factors. We demonstrate the approach by analyzing, at a county-level the probable impact of switchgrass production on erosion, evapotranspiration, nitrate in runoff, and phosphorous fertilizer use in multi-county subregions within the Tennessee Valley Authority (TVA) region. Our results show that the adoption of switchgrass production will have different impacts in each subregion as a result of differences in the initial land use and soil conditions in the subregions. Erosion, evapotranspiration, and nitrate in runoff are projected to decrease in both subregions as switchgrass displaces the current crops. Phosphorous fertilizer applications are likely to increase in one subregion and decrease in the other due to initial differences in the types of conventional crops grown in each subregion. Overall these changes portend an improvement in water quality in the subregions with the increasing adoption of switchgrass.

  9. Renewable biomass energy: Understanding regional scale environmental impacts

    International Nuclear Information System (INIS)

    Graham, R.L.; Downing, M.

    1993-01-01

    If biomass energy is to become a significant component of the US energy sector, millions of acres of farmland must be converted to energy crops. The environmental implications of this change in land use must be quantitatively evaluated. The land use changes will be largely driven by economic considerations. Farmers will grow energy crops when it is profitable to do so. Thus, models which purport to predict environmental changes induced by energy crop production must take into account those economic features which will influence land use change. In this paper, we present an approach for projecting the probable environmental impacts of growing energy crops at the regional scale. The approach takes into account both economic and environmental factors. We demonstrate the approach by analyzing, at a county-level, the probable impact of switchgrass production on erosion, evapotranspiration, nitrate in runoff, and phosphorous fertilizer use in two multi-county subregions within the Tennessee Valley Authority (TVA) region. Our results show that the adoption of switchgrass production will have different impacts in each subregion as a result of differences in the initial land use and soil conditions in the subregions. Erosion, evapotranspiration, and nitrate in runoff are projected to decrease in both subregions as switchgrass displaces the current crops. Phosphorous fertilizer applications are likely to increase in one subregion and decrease in the other due to initial differences in the types of conventional crops grown in each subregion. Overall these changes portend an improvement in water quality in the subregions with the increasing adoption of switchgrass

  10. Environmental impact assessment of nuclear desalination

    International Nuclear Information System (INIS)

    2010-03-01

    Nuclear desalination is gaining interest among the IAEA Member States, as indicated by the planned projects, and it is expected that the number of nuclear desalination plants will increase in the near future. The IAEA has already provided its Member States with reports and documents that disseminate information regarding the technical and economic feasibility of nuclear desalination. With the rising environmental awareness, in the scope of IAEA's activities on seawater desalination using nuclear power, a need was identified for a report that would provide a generic assessment of the environmental issues in nuclear desalination. In order to offer an overview of specific environmental impacts which are to be expected, their probable magnitude, and recommended mitigation measures, this publication encompasses information provided by the IAEA Member States as well as other specialized sources. It is intended for decision makers and experts dealing with environmental, desalination and water management issues, offering insight into the environmental aspects that are essential in planning and developing nuclear desalination

  11. Environmental impact assessment of oilfield upgrades in Bohai Sea

    Science.gov (United States)

    Chen, Ruihui; Xiong, Yanna; Li, Jiao; Li, Xianbo

    2018-02-01

    This paper designed 65 environmental monitoring sites to collect samples and analyze for better evaluating the environmental impact generated by cuttings, mud, produced water with oil and oil pollutions that produced during the upgrading in the Bohai Sea where the oil field 34-1 upgraded. Collecting samples include ocean water, marine life and sediments and test items involve PH, dissolved oxygen (DO), salinity, chemical oxygen demand (COD), phosphate, organic carbon, sulfide, inorganic nitrogen, petroleum, copper (Cu), lead (Pb), zinc (Zn), cadmium (Cd), total chromium (Cr), total mercury (Hg) and arsenic (As). Meanwhile sample sites collect and analyze the abundance and diversity of marine plants and elaborated the environmental impact caused by upgrading renovation project from the aspects of sea water, marine life and marine sediments. Through analysis and comparison we found that seawater quality conform the Ш seawater quality standards, the excessive rate of Cu is 10%, the average diversity index of marine life is 2.34 and evenness is 0.68. Influence range of marine sediments and pollutants of production is within 2.68km and basically has no serious impact in the surrounding sea area. It’s worth nothing that reconstruction project has the risk of oil spilling and protective measures must be prepared.

  12. Environmental Effects of Sediment Transport Alteration and Impacts on Protected Species: Edgartown Tidal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, Stephen B; Schlezinger, David, Ph.D; Cowles, Geoff, Ph.D; Hughes, Patricia; Samimy,; Roland, I; and Terray, E, Ph.D.

    2012-12-29

    anchors. This is the same technology proposed by Ocean Renewable Power Company in the Western Passage and Cobscook Bay near Eastport Maine. The blades rotate in two directions capturing the tides energy both during flood and ebb tides. The turbines will be anchored to the bottom and suspended in the water column. Initial depth of the turbines is expected to be about 25 feet below the surface to avoid impacting navigation while also capturing the strongest currents. The Town of Edgartown was initially granted a Preliminary Permit by the Federal Energy Regulatory Commission (FERC) on March 1, 2008, and has recently received a second permit valid through August 2014. The Preliminary Permit gives Edgartown the exclusive right to apply for a power generation license for power generated from the hydrokinetic energy in the water flowing in this area. Edgartown filed a Draft Pilot License Application with FERC on February 1, 2010 and an Expanded Environmental Notification Form with the Massachusetts Environmental Policy Act (MEPA) Office at the same time. It expects to file a Final License Application in late 2013. Harris Miller Miller & Hanson (HMMH) of Burlington Massachusetts is acting as the Project Manager for the Town of Edgartown and collaborating with other partners of the project including the University of Massachusetts - Dartmouth's Marine Renewable Energy Center and the Massachusetts Clean Energy Center. HMMH was awarded a grant under the Department of Energy's Advanced Water Program to conduct marine science and hydrokinetic site-specific environmental studies for projects actively seeking a FERC License. HMMH, on behalf of the Town, is managing this comprehensive study of the marine environment in Muskeget Channel and potential impacts of the tidal project on indicator species and habitats. The University of Massachusetts School of Marine Science and Technology (SMAST) conducted oceanographic studies of tidal currents, tide level, benthic habitat, and

  13. Environmental impact report addendum for the continued operation of Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Weston, R. F.

    1996-01-01

    An environmental impact statement/environmental impact report (ES/EIR) for the continued operation and management of Lawrence Livermore National Laboratory (LLNL) was prepared jointly by the U.S. Department of Energy (DOE) and the University of California (UC). The scope of the document included near-term (within 5-10 years) proposed projects. The UC Board of Regents, as state lead agency under the California Environmental Quality Act (CEQA), certified and adopted the EIR by issuing a Notice of Determination on November 20, 1992. The DOE, as the lead federal agency under the National Environmental Policy Act (NEPA), adopted a Record of Decision for the ES on January 27, 1993 (58 Federal Register [FR] 6268). The DOE proposed action was to continue operation of the facility, including near-term proposed projects. The specific project evaluated by UC was extension of the contract between UC and DOE for UC's continued operation and management of LLNL (both sites) from October 1, 1992, through September 30, 1997. The 1992 ES/EIR analyzed impacts through the year 2002. The 1992 ES/EIR comprehensively evaluated the potential environmental impacts of operation and management of LLNL within the near-term future. Activities evaluated included programmatic enhancements and modifications of facilities and programs at the LLNL Livermore site and at LLNL's Experimental Test Site (Site 300) in support of research and development missions 2048 established for LLNL by Congress and the President. The evaluation also considered the impacts of infrastructure and building maintenance, minor modifications to buildings, general landscaping, road maintenance, and similar routine support activities

  14. Environmental impact assessment in regional administration - the province of Oulu as an example

    International Nuclear Information System (INIS)

    Toerttoe, H.; Kaakinen, E.; Alasaarela, E.

    1992-01-01

    The environmental impact assessment (EIA) procedure is concerned with the alternatives available in activities which profoundly affect the condition of our natural environment, built-up environment and society through given intermediate stages, the detrimental effects of these activities and the possibilities for reducing such effects. The procedure provides a comprehensive explanation of the above aspects and yields the necessary material for making the relevant decisions through well-organised negotiations between the parties involved. The majority of this material is gathered together in an environmental impact statement (EIS). The data can then be used for deciding on the implementation of individual projects. The research project 'Environmental Impact Assessment in Regional Administration - the Province of Oulu as an Example' is a part of the preparations being made by the Ministry of the Environment for introducing such an evaluation procedure for use in Finland. The primary aim of the project is to develop planning and cooperation procedures for use in regional administration that will allow evaluation of the environmental effects of various projects and activates and ensure that these effects can be evaluated and taken into consideration in a comprehensive manner at an early planning stage on the basis of existing procedures and legislation. The research, which takes the province of Oulu as an example, has involved close cooperation with the EIA '92 working group set up by the Ministry of the Environment, since the report of this working group provides a general framework for the evaluation of environmental effects

  15. 2004 Power marketing program draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    This is volume 3 of a draft environmental impact statement from the Western Power Administration's Sierra Nevada Region. Information is included on the following topics: statutory and legal framework; Sierra Nevada region customer groups and economic regions; renewable technology cost information matrix; hydrological assumptions; recreation resources along river reaches and the delta; archaeological and historical aspects; power resources in PROSYM; air quality regulatory structure; energy generation for PROSYM cases; overall power costs for utility, agriculture, and other customers; socioeconomic impacts in specific economic regions; projected air resource impacts; and land use, water quality, and solid waste impact factors

  16. Applicability of the "Frame of Reference" approach for environmental monitoring of offshore renewable energy projects.

    Science.gov (United States)

    Garel, Erwan; Rey, Cibran Camba; Ferreira, Oscar; van Koningsveld, Mark

    2014-08-01

    This paper assesses the applicability of the Frame of Reference (FoR) approach for the environmental monitoring of large-scale offshore Marine Renewable Energy (MRE) projects. The focus is on projects harvesting energy from winds, waves and currents. Environmental concerns induced by MRE projects are reported based on a classification scheme identifying stressors, receptors, effects and impacts. Although the potential effects of stressors on most receptors are identified, there are large knowledge gaps regarding the corresponding (positive and negative) impacts. In that context, the development of offshore MRE requires the implementation of fit-for-purpose monitoring activities aimed at environmental protection and knowledge development. Taking European legislation as an example, it is suggested to adopt standardized monitoring protocols for the enhanced usage and utility of environmental indicators. Towards this objective, the use of the FoR approach is advocated since it provides guidance for the definition and use of coherent set of environmental state indicators. After a description of this framework, various examples of applications are provided considering a virtual MRE project located in European waters. Finally, some conclusions and recommendations are provided for the successful implementation of the FoR approach and for future studies. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Final environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-08-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  18. Environmental impacts of international shipping. A case study of the port of Rotterdam

    International Nuclear Information System (INIS)

    Den Boer, E.; Verbraak, G.

    2010-01-01

    As part of the project 'Environmental Impacts of International Shipping: the role of ports' of the Working Group on Transport under OECD's Environment Policy Committee, CE Delft carried out this case study focusing on how the port of Rotterdam and the Dutch authorities address the environmental impacts of the port and its interactions with the hinterlands.

  19. Environmental impact assessment of the Krapivino hydro development

    International Nuclear Information System (INIS)

    Kayakin, V.V.; Mulina, A.V.; Novozilov, A.P.

    1993-01-01

    An environmental impact assessment (EIA) of planned measures in one or another form has always been carried out during project studies for hydrotechnical construction. In this paper, the experience is presented of drawing up the open-quotes EIAclose quotes section of the Krapivino hydroelectric development project as a result of substantial transformation of the project after its public discussion and stopping construction in 1989. Topics of discussion of this paper include the ecological situation and means of solving the problem, ecological and economic assessment of the program of measures, and ways of adaptation of the projects and solution of controversial problems. 6 figs., 1 tab

  20. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    International Nuclear Information System (INIS)

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact

  1. Environmental assessment: Kotzebue Wind Installation Project, Kotzebue, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The DOE is proposing to provide financial assistance to the Kotzebue Electric Association to expand its existing wind installation near Kotzebue, Alaska. Like many rural Alaska towns, Kotzebue uses diesel-powered generators to produce its electricity, the high cost of which is currently subsidized by the Alaska State government. In an effort to provide a cost effective and clean source of electricity, reduce dependence on diesel fuel, and reduce air pollutants, the DOE is proposing to fund an experimental wind installation to test commercially available wind turbines under Arctic conditions. The results would provide valuable information to other Alaska communities experiencing similar dependence on diesel-powered generators. The environmental assessment for the proposed wind installation assessed impacts to biological resources, land use, electromagnetic interference, coastal zone, air quality, cultural resources, and noise. It was determined that the project does not constitute a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required, and DOE has issued a Finding of No Significant Impact.

  2. 2004 Power marketing program final EIS - final environmental impact statement. Volume 2 - appendices

    International Nuclear Information System (INIS)

    1997-02-01

    This volume contains appendices to the Final Environmental Impact Statement (FEIS) for the Power Marketing Program proposal of the Western Area Power Administration. The FEIS identified peaking power scheduling as the environmentally preferred alternative, and presented the analysis of alternatives and environmental impacts. Sixteen appendices to the FEIS are included in this document. The appendices are: Statutory and Legal Framework; Sierra Nevada Region Customer Groups and Economic Regions; Renewable Technology Cost Information Matrix; Hydrological Assumptions; Recreation Resources; Archaeological and Historical Resources; Incremental Power Resources; Air Quality Regulatory Structure; Energy Generation; Stage Contents Relationships for Regulating Reservoirs; Power Costs; Socioeconomic Impacts; Projected Air Resource Impacts; Land use, Water Quality, and Solid Waste Impact Factors; Draft Environmental Impact Statement Comments and Responses, and Contractor Disclosure Statements. 21 figs., 24 tabs

  3. Billy Shaw Dam and Reservoir : Environmental Assessment and Finding of No Significant Impacts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Shoshone-Paiute Tribes of the Duck Valley Reservation, Nevada.

    1997-03-01

    This notice announces BPA`s decision to fund the construction, operation, and maintenance of the Billy Shaw Dam and Reservoir on the Duck Valley Reservation. This project is part of a continuing effort to address system-wide fish and wildlife losses caused by the development of the hydropower system in the Columbia River Basin. BPA has prepared an Environmental Assessment (EA) evaluating the potential environmental impacts of the proposed project. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  4. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  5. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  6. 76 FR 70429 - Notice of Intent To Prepare an Environmental Impact Statement and Notice of Potential Floodplain...

    Science.gov (United States)

    2011-11-14

    ..., financial, environmental, and other considerations. DOE selects projects demonstrating the most promise when... (10 CFR part 1021), to assess the potential environmental impacts of providing financial assistance...-Combustion CO 2 Capture and Sequestration Project (Parish PCCS Project) for a financial assistance award...

  7. Methods for assessing environmental impacts of a FUSRAP property-cleanup/interim-storage remedial action

    International Nuclear Information System (INIS)

    Wyman, D.J.

    1982-12-01

    This document provides a description of a property-cleanup/interim-storage action, explanation of how environmental impacts might occur, comprehensive treatment of most potential impacts that might occur as a result of this type of action, discussion of existing methodologies for estimating and assessing impacts, justification of the choice of specific methodologies for use in FUSRAP environmental reviews, assessments of representative impacts (or expected ranges of impacts where possible), suggested mitigation measures, and some key sources of information. The major topical areas covered are physical and biological impacts, radiological impacts, and socioeconomic impacts. Some project-related issues were beyond the scope of this document, including dollar costs, specific accident scenarios, project funding and changes in Congressional mandates, and project management (contracts, labor relations, quality assurance, liability, emergency preparedness, etc.). These issues will be covered in other documents supporting the decision-making process. Although the scope of this document covers property-cleanup and interim-storage actions, it is applicable to other similar remedial actions. For example, the analyses discussed herein for cleanup activities are applicable to any FUSRAP action that includes site cleanup

  8. 76 FR 4371 - Notice of Intent to Prepare an Environmental Impact Statement for the Proposed San Juan Basin...

    Science.gov (United States)

    2011-01-25

    ...; NMNM122352] Notice of Intent to Prepare an Environmental Impact Statement for the Proposed San Juan Basin Energy Connect Project, San Juan County, New Mexico, and La Plata County, Colorado AGENCY: Bureau of Land... prepare an Environmental Impact Statement (EIS) on the proposed San Juan Energy Connect Project, and by...

  9. Coping with uncertainty in environmental impact assessments: Open techniques

    Energy Technology Data Exchange (ETDEWEB)

    Cardenas, Ibsen C., E-mail: c.cardenas@utwente.nl [IceBridge Research Institutea, Universiteit Twente, P.O. Box 217, 7500 AE Enschede (Netherlands); Halman, Johannes I.M., E-mail: J.I.M.Halman@utwente.nl [Universiteit Twente, P.O. Box 217, 7500 AE Enschede (Netherlands)

    2016-09-15

    Uncertainty is virtually unavoidable in environmental impact assessments (EIAs). From the literature related to treating and managing uncertainty, we have identified specific techniques for coping with uncertainty in EIAs. Here, we have focused on basic steps in the decision-making process that take place within an EIA setting. More specifically, we have identified uncertainties involved in each decision-making step and discussed the extent to which these can be treated and managed in the context of an activity or project that may have environmental impacts. To further demonstrate the relevance of the techniques identified, we have examined the extent to which the EIA guidelines currently used in Colombia consider and provide guidance on managing the uncertainty involved in these assessments. Some points that should be considered in order to provide greater robustness in impact assessments in Colombia have been identified. These include the management of stakeholder values, the systematic generation of project options, and their associated impacts as well as the associated management actions, and the evaluation of uncertainties and assumptions. We believe that the relevant and specific techniques reported here can be a reference for future evaluations of other EIA guidelines in different countries. - Highlights: • uncertainty is unavoidable in environmental impact assessments, EIAs; • we have identified some open techniques to EIAs for treating and managing uncertainty in these assessments; • points for improvement that should be considered in order to provide greater robustness in EIAs in Colombia have been identified; • the paper provides substantiated a reference for possible examinations of EIAs guidelines in other countries.

  10. Coping with uncertainty in environmental impact assessments: Open techniques

    International Nuclear Information System (INIS)

    Cardenas, Ibsen C.; Halman, Johannes I.M.

    2016-01-01

    Uncertainty is virtually unavoidable in environmental impact assessments (EIAs). From the literature related to treating and managing uncertainty, we have identified specific techniques for coping with uncertainty in EIAs. Here, we have focused on basic steps in the decision-making process that take place within an EIA setting. More specifically, we have identified uncertainties involved in each decision-making step and discussed the extent to which these can be treated and managed in the context of an activity or project that may have environmental impacts. To further demonstrate the relevance of the techniques identified, we have examined the extent to which the EIA guidelines currently used in Colombia consider and provide guidance on managing the uncertainty involved in these assessments. Some points that should be considered in order to provide greater robustness in impact assessments in Colombia have been identified. These include the management of stakeholder values, the systematic generation of project options, and their associated impacts as well as the associated management actions, and the evaluation of uncertainties and assumptions. We believe that the relevant and specific techniques reported here can be a reference for future evaluations of other EIA guidelines in different countries. - Highlights: • uncertainty is unavoidable in environmental impact assessments, EIAs; • we have identified some open techniques to EIAs for treating and managing uncertainty in these assessments; • points for improvement that should be considered in order to provide greater robustness in EIAs in Colombia have been identified; • the paper provides substantiated a reference for possible examinations of EIAs guidelines in other countries.

  11. Evaluating aggregate terrestrial impacts of road construction projects for advanced regional mitigation.

    Science.gov (United States)

    Thorne, James H; Girvetz, Evan H; McCoy, Michael C

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  12. Evaluating Aggregate Terrestrial Impacts of Road Construction Projects for Advanced Regional Mitigation

    Science.gov (United States)

    Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  13. Standarized input for Hanford environmental impact statements. Part II: site description

    International Nuclear Information System (INIS)

    Jamison, J.D.

    1982-07-01

    Information is presented under the following section headings: summary description; location and physiography; geology; seismology; hydrology; meteorology; ecology; demography and land use; and radiological condition. Five appendixes are included on the 100N, 200 east, 200 west, 300, and 400 areas. This report is intended to provide a description of the Hanford Site against which the environmental impacts of new projects at Hanford can be assessed. It is expected that the summary description amplified with material from the appropriate appendix, will serve as the basic site description section of environmental impact statements prepared to address the requirements of the National Environmental Policy Act

  14. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  15. C.2 analysis of the environmental effects of the Nuclear Facilities Modernization project

    International Nuclear Information System (INIS)

    1991-04-01

    This analysis indicates that the potential impacts associated with the current/projected Mound tritium operations are adequately bounded by the existing environmental impacts analyzed in the FEIS. It also indicates that the incremental impacts of the NFM project will make a positive contribution to the overall impact of current/projected tritium operations. Except for minor and normal temporary conditions during the construction and demolition phases, the NFM project would measurably reduce the likelihood of adverse consequences to the environment. Relocation of the PE/PD laboratory operations from the SW/R Tritium Complex to the T Building will place these operations in a safer, state-of-the-art glovebox systems. Through the utilization of modern laboratory equipment and enhanced containment, the project will reduce the quantity of routine airborne tritium releases and volume of solid tritiated wastes resulting from routine PE/PD laboratory operations. The increased reliance placed on engineered safety aspects and stronger mitigative measures by the project will also reduce the risk associated with these operations by reducing both the probability and consequences of unusual occurrences involving uncontrolled tritium releases

  16. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  17. Interim report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  18. Final terms of reference for the Environmental Impact Assessment (EIA) report for the proposed Suncor Energy Inc., Project Millennium, Fort McMurray, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-04

    This document identifies the information that Suncor will need to prepare and submit as an Environmental Impact Assessment (EIA) report as part of its application to the Alberta Energy and Utilities Board for the construction, operation and reclamation of its proposed Millenium extension of the Steepbank Mine. The report must identify development activities, describe environmental effects, mitigation options and residual effects that are relevant to the assessment of the project. The report must also include a description of the processing facilities, mining activities, utilities and transportation. Similarly, the report must provide a full description of the environmental management systems in place, as well as details of the proposed management of air emissions, water, waste, hydrocarbons, and chemicals. The report will be made public to allow for participation from those who may be affected by the project. This includes residents and organizations in the Fort McMurray, Fort McKay, and Fort Chipewyan areas.

  19. The environmental aspects of a tidal power project in the upper reaches of the Bay Fundy

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, D.C.; Longhurst, A.R.

    1979-02-01

    A recommendation for pre-investment design studies for a tidal power development in the Cumberland Basin region of the Bay of Fundy has been made by the Bay of Fundy Tidal Power Review Board and is backed by Canadian provincial and federal governments. A brief history of regional tidal power proposals is presented, and procedures for determining the environmental impacts of the project are outlined. Possible environmental consequences of tidal power development can be hypothesized, but the existing environmental data base is sparse. Investigations are presently being expanded by university and governmental scientists, and specific impact assessment studies will be commissioned if the project is authorized to proceed. (1 map, 11 references)

  20. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... Environmental Impact Statements-General Requirements § 51.93 Distribution of final environmental impact...

  1. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  2. Study on environmental impact assessment of uranium mining and milling base planning

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    Environmental impact assessment (EIA) of project planning is part of strategic EIA, which provides full consideration and evaluation of the potential environmental impact on tiered basis in the process of plan implementation. With account being taken of EIA of uranium mining/milling base and the current situation of mining/milling industry, this paper determined environmental protection objectives of EIA, screened assessment indexes and identified weighting factors. Based on the characteristics of mines planned, restrictive score values are estimated each for EIA weighting factor. Finally some suggestions were made for adjusting the plan. (authors)

  3. Bear Creek Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Bear Creek Project consists of mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from six known ore bodies will take place over ten years; a 1000 tons ore/day will be constructed and operated as long as ore is available. The tailings will be stored onsite in an impoundment. The project would convert 2700 acres from grazing use to mining/milling activities for about ten years. Mining would disturb a total of 1600 acres but, because of reclamation, the max acreage disturbed at any one time would be about 1000 acres, the average being about 650 acres. Dose rates were computed for an individual in a ranch house at the nearest ranch. Conditions for the protection of the environment are proposed. Possible environmental impacts evaluated cover air, land, water, soil, vegetation, wildlife, and community. A benefit-cost analysis is made

  4. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  5. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  6. Public Participation Planning of Environmental Impact Assessment (EIA) and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    Science.gov (United States)

    Hindrayani, Aniek; Purwanto

    2018-02-01

    The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA) and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1) the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3) suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3) implementation of the environmental management of other licensed activities affecting the behavior (4) stakeholders (project proponent, EIA consultants, and EIA appraisal committee) do not play their role as mandated in applicable legislation.

  7. Information to help reduce environmental impacts from freshwater oil spills

    International Nuclear Information System (INIS)

    Fritz, D.E.; Steen, A.E.

    1995-01-01

    The American Petroleum Institute (API) has been working since 1990 to provide information to help the response community minimize the impact of spills to pared jointly with the US inland freshwater. Projects have included a manual, pre National Oceanic and Atmospheric Administration (NOAA), to give guidance on the cleanup techniques that will minimize environmental impacts on spills in freshwater habitats. Nearing completion are a literature review and annotated bibliography of the environmental and human health effects of oil spilled in freshwater habitats. The use of chemical treating agents for freshwater spill applications is being studied with input from other industry and government groups. A project has begun, with funding from API, the Louisiana Applied Oil Spill Research and Development Program, NOAA, the Marine Spill Response Corporation (MSRC), and the US Department of Energy, to evaluate in situ burning of oil spilled in marshes

  8. The environmental Impacts of tobaccos

    International Nuclear Information System (INIS)

    Shah, J.; Sohail, N.

    2006-01-01

    Tobacco is an important cash crop in Pakistan. It is a sensitive plant, prone to bacterial, fungal and viral diseases. Therefore, high levels of pesticides are used to grow tobacco. Many of these pesticides are highly toxic and have profound impacts not only on the smokers but also on the lives of tobacco farmers, their families and the environment. The environmental impacts of tobacco crop start right from its seedlings stage till throwing away of cigarette filters. These impacts are divided into three stages: (a) Environmental impacts at the tobacco growing stage, (b) Environmental impacts at tobacco manufacturing/processing stage, and (c) Environmental impacts of the tobacco use. This paper provides information of environmental impacts of tobacco crop at all the above-mentioned three stages and recommends measures for mitigation. (author)

  9. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  10. Yakima Fisheries Project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (open-quotes adaptive managementclose quotes); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery

  11. Environmental impact assessment of dutch tomato crop production in a Venlo glasshouse

    NARCIS (Netherlands)

    Antón, A.; Torrellas, M.; Montero, J.I.; Ruijs, M.N.A.; Vermeulen, P.C.M.; Stanghellini, C.

    2012-01-01

    This environmental impact assessment of the current situation of Dutch tomato production in a Venlo greenhouse in a temperate climate was developed as part of the EUPHOROS project. The project aims to develop a more sustainable greenhouse system with a reduction of external inputs yet with high

  12. Global guidance on environmental life cycle impact assessment indicators: Progress and case study

    DEFF Research Database (Denmark)

    Frischknecht, Rolf; Fantke, Peter; Tschümperlin, Laura

    2016-01-01

    Purpose The life cycle impact assessment (LCIA) guidance flagship project of the United Nations Environment Programme (UNEP)/Society of Environmental Toxicology and Chemistry (SETAC) Life Cycle Initiative aims at providing global guidance and building scientific consensus on environmental LCIA in...

  13. Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis.

    Science.gov (United States)

    Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran

    2018-05-10

    Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant

  14. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Agol, Dorice, E-mail: d.agol@uea.a.c.uk [University of East Anglia, School of International Development, Norwich NR4 7TJ (United Kingdom); Latawiec, Agnieszka E., E-mail: a.latawiec@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Opole University of Technology, Department of Production Engineering and Logistics, Luboszycka 5, 45-036 Opole (Poland); University of East Anglia, School of Environmental Sciences, Norwich NR4 7TJ (United Kingdom); Strassburg, Bernardo B.N., E-mail: b.strassburg@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Department of Geography and the Environment, Pontificia Universidade Catolica, 22453-900 Rio de Janeiro (Brazil)

    2014-09-15

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  15. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    International Nuclear Information System (INIS)

    Agol, Dorice; Latawiec, Agnieszka E.; Strassburg, Bernardo B.N.

    2014-01-01

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  16. 76 FR 14745 - Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement, Ada and Canyon...

    Science.gov (United States)

    2011-03-17

    ... To Prepare an Environmental Impact Statement, Ada and Canyon Counties, ID AGENCY: Federal Highway... prepare an Environmental Impact Statement for a proposed highway project in Ada and Canyon County, Idaho... Highway 44 from Exit 25 at Interstate 84 in Canyon County to Ballantyne Lane in Ada County. The project is...

  17. A GIS-based approach for the screening assessment of noise and vibration impacts from transit projects.

    Science.gov (United States)

    Hamed, Maged; Effat, Waleed

    2007-08-01

    Urban transportation projects are essential in increasing the efficiency of moving people and goods within a city, and between cities. Environmental impacts from such projects must be evaluated and mitigated, as applicable. Spatial modeling is a valuable tool for quantifying the potential level of environmental consequences within the context of an environmental impact assessment (EIA) study. This paper presents a GIS-based tool for the assessment of airborne-noise and ground-borne vibration from public transit systems, and its application to an actual project. The tool is based on the US Federal Transit Administration's (FTA) approach, and incorporates spatial information, satellite imaging, geostatistical modeling, and software programming. The tool is applied on a case study of initial environmental evaluation of a light rail transit project in an urban city in the Middle East, to evaluate alternative layouts. The tool readily allowed the alternative evaluation and the results were used as input to a multi-criteria analytic framework.

  18. Environmental impact assessment for nuclear and coal-fired power stations in Czechoslovakia

    International Nuclear Information System (INIS)

    Lapcik, V.

    1994-01-01

    Czechoslovakia has had legislation requiring environmental impact assessment since 1992. A methodology for complex evaluation of areas with thermal and nuclear energy sources, as related to ecology and environment, was developed by the staff of the Department of Ecology in accordance with the environmental Protection act (No. 17/1992) for use by the Czech Energy Company (Prague). This methodology will serve as a handbook of environmental impact assessment for the energy industry. Chapter 1 of the handbook describes the project, including information on the site, design, and size of the thermal or nuclear power station. Chapter 2 includes the data necessary to identify and assess the main effects that the project is likely to have on the environment. Chapter 3 describes aspects of the environment likely to be affected significantly by a proposed project, including population, fauna, flora, soil, water, air, climatic factors, material assets (such as architectural and archeological heritage), landscape, and the interrelationship between the above factors. Chapter 4 summarizes the measures envisaged to prevent, reduce, and where possible, offer any significant adverse effects on the environment

  19. Standarized input for Hanford environmental impact statements. Part II: site description

    Energy Technology Data Exchange (ETDEWEB)

    Jamison, J.D.

    1982-07-01

    Information is presented under the following section headings: summary description; location and physiography; geology; seismology; hydrology; meteorology; ecology; demography and land use; and radiological condition. Five appendixes are included on the 100N, 200 east, 200 west, 300, and 400 areas. This report is intended to provide a description of the Hanford Site against which the environmental impacts of new projects at Hanford can be assessed. It is expected that the summary description amplified with material from the appropriate appendix, will serve as the basic site description section of environmental impact statements prepared to address the requirements of the National Environmental Policy Act (NEPA).

  20. 75 FR 7515 - Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the...

    Science.gov (United States)

    2010-02-19

    ... Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment... Commission (CEC) have prepared a Draft Environmental Impact Statement (EIS), Draft California Desert... impacts of the proposed Solar Two Project on air quality, biological resources, cultural resources, water...

  1. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  2. Spent fuel repositories and environmental impact assessment; the legal situation i Finland

    International Nuclear Information System (INIS)

    Manninen, J.

    1995-01-01

    The Finnish Act on Environmental Impact Assessment (468/94) builds on the EU Directive 85/337 on the assessment of the effects of certain public and private projects on the environment. The Act is supplemented by the Decree on Environmental Impact Assessment (792/88). The EIA Act is applicable to all nuclear facilities, spent fuel repositories included. In practice the new Act does not introduce any drastic changes to the legal situation, as far as nuclear facilities are concerned. The Finnish Nuclear Energy Act (990/87), which entered into force 1988, already contains most of the basic elements of the environmental impact assessment. In the article, the different steps in the Finnish EIA procedure is described

  3. The Contribution of Project Environmental Assessment to Assessing and Managing Cumulative Effects: Individually and Collectively Insignificant?

    Science.gov (United States)

    Noble, Bram; Liu, Jialang; Hackett, Paul

    2017-04-01

    This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.

  4. Deciding over nature: Corruption and environmental impact assessments

    International Nuclear Information System (INIS)

    Williams, Aled; Dupuy, Kendra

    2017-01-01

    Environmental Impact Assessments (EIAs) are an important analytic tool for identifying and potentially mitigating project risks and negative environmental and societal impacts. Their usefulness, however, depends on how they are implemented and on whether findings are used in public decision-making. Given the notorious vulnerability of public-private interactions to corrupt practices, we examine potential and actual corruption risks across four stages of a generic EIA process. Combined with case analysis of the EIA process in Albania, a Southeastern European context experiencing serious governance challenges, we reflect on the vulnerabilities of EIAs to various forms of corruption from a principal-agent perspective. We concur with earlier research suggesting that the fundamentally rationalist approach behind EIAs do not necessarily match the empirical realities of public environmental decision-making, particularly in less mature EIA systems. We conclude with suggestions for framing a future research agenda in this area and touch on tentative policy remedies.

  5. Impacts of nuclear and hydroelectric great projects: economical, technological, environmental and social aspects

    International Nuclear Information System (INIS)

    Rosa, L.P.; Sigaud, L.; Mielnik, O.

    1988-01-01

    Some studies about the Great Impacts of Energy Sources, mainly nuclear power plant and hydroelectric power plant, in Brazil are presented. The technological, economical, social and environmental aspects are described [pt

  6. Yakima Fisheries Project : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  7. Environmental impact of climate change in pakistan

    International Nuclear Information System (INIS)

    Khan, S.; Raja, I.A.

    2014-01-01

    Climate change results in the increase or decrease in temperature and rainfall. These have significant impact on environment - impinge agricultural crop yields, affect human health, cause changes to forests and other ecosystems, and even impact our energy supply. Climate change is a global phenomenon and its impact can be observed on Pakistan's economy and environment. This paper contains details concerning the climate change and environmental impacts. It takes into account current and projected key vulnerabilities, prospects for adaptation, and the relationships between climate change mitigation and environment. The purpose of the study is to devise national policies and incentive systems combined with national level capacity-building programs to encourage demand-oriented conservation technologies. Recommendations are also made to abate the climate change related issues in country. (author)

  8. Impact of environmental auditing on environmental pollution ...

    African Journals Online (AJOL)

    Impact of environmental auditing on environmental pollution, sustainable development and healthy environment of some organizations in Port Harcourt, Nigeria. ... Journal of Applied Sciences and Environmental Management. Journal Home ...

  9. The methodology of environmental impacts assessment of environmentally hazardous facilities

    OpenAIRE

    Adamenko, Yaroslav

    2017-01-01

    The article deals with the methodology of environmental impacts assessment of environmentally hazardous facilities and activities. The stages of evaluation of environmental impacts are proved. The algorithm and technology of decision-making in the system of environmental impact assessments based on a multi-criteria utility theory are proposed.

  10. Determining Vulnerability Importance in Environmental Impact Assessment

    International Nuclear Information System (INIS)

    Toro, Javier; Duarte, Oscar; Requena, Ignacio; Zamorano, Montserrat

    2012-01-01

    The concept of vulnerability has been used to describe the susceptibility of physical, biotic, and social systems to harm or hazard. In this sense, it is a tool that reduces the uncertainties of Environmental Impact Assessment (EIA) since it does not depend exclusively on the value assessments of the evaluator, but rather is based on the environmental state indicators of the site where the projects or activities are being carried out. The concept of vulnerability thus reduces the possibility that evaluators will subjectively interpret results, and be influenced by outside interests and pressures during projects. However, up until now, EIA has been hindered by a lack of effective methods. This research study analyzes the concept of vulnerability, defines Vulnerability Importance and proposes its inclusion in qualitative EIA methodology. The method used to quantify Vulnerability Importance is based on a set of environmental factors and indicators that provide a comprehensive overview of the environmental state. The results obtained in Colombia highlight the usefulness and objectivity of this method since there is a direct relation between this value and the environmental state of the departments analyzed. - Research Highlights: ► The concept of vulnerability could be considered defining Vulnerability Importance included in qualitative EIA methodology. ► The use of the concept of environmental vulnerability could reduce the subjectivity of qualitative methods of EIA. ► A method to quantify the Vulnerability Importance proposed provides a comprehensive overview of the environmental state. ► Results in Colombia highlight the usefulness and objectivity of this method.

  11. 10 CFR 51.74 - Distribution of draft environmental impact statement and supplement to draft environmental impact...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... Impact Statements § 51.74 Distribution of draft environmental impact statement and supplement to draft...

  12. Public Participation Planning of Environmental Impact Assessment (EIA and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    Directory of Open Access Journals (Sweden)

    Hindrayani Aniek

    2018-01-01

    Full Text Available The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1 the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3 suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3 implementation of the environmental management of other licensed activities affecting the behavior (4 stakeholders (project proponent, EIA consultants, and EIA appraisal committee do not play their role as mandated in applicable legislation.

  13. Environmental Assessment -- Test Area North pool stabilization project update

    International Nuclear Information System (INIS)

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN

  14. Environmental impact statement law and environmental impact statement administration regulation

    International Nuclear Information System (INIS)

    Feldmann, F.J.

    1991-01-01

    The contribution does not deal with the question - as might be suggested by the heading - that the execution of the environmental impact statement law might be uncertain if there are no further accompanying legal transformatory acts. Putting the environmental impact statements into action is concerned in partiuclar with procedural provisions regarding the Federal Act on Protection against Nuisances and the Atomic Energy Act. The author deals with aspects of the environmental impact statement law and the state-of-the-art achieved so far. He also deals with legislative intent, with further points of putting the law into practice, i.e. the information requirements in the administrative provisions and the integrating aspect, the amalgamating aspect, the requirements made on the state of the environment, and the significance of administrative provisions. Also treated are legal procedures in the Federal Laender and on an international level. (RST) [de

  15. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  16. The screening and scoping of Environmental Impact Assessment and Strategic Environmental Assessment of Carbon Capture and Storage in the Netherlands

    International Nuclear Information System (INIS)

    Koornneef, Joris; Faaij, Andre; Turkenburg, Wim

    2008-01-01

    The Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) are procedural tools which have as goal to assess and evaluate possible environmental effects of, respectively, a proposed project or policy plan. The goal of this article is to explore possible bottlenecks in applying both the EIA and SEA procedures on Carbon Capture and Storage (CCS) activities in the Netherlands, as experience is currently minimal or lacking. In this study we focus mainly on the institutional and procedural aspects of the screening and scoping phases of both procedures. This is achieved by reviewing EIA and SEA procedures for analogue projects for the three distinctive process steps of a CCS project, namely the power plant with capture, the transport and finally the underground storage of the CO 2 . Additionally, EIA and SEA or similar procedures on CCS in other countries are reviewed and the legal framework for the Dutch EIA and SEA is studied. This article shows a concise overview of the EIA and SEA procedure in the Netherlands and the relation between both procedures. Based on our findings we have constructed a conceptual taxonomy for the scope of both procedures for CCS in the Netherlands. This taxonomy conceptualizes the possible integration of assessing the environmental impacts for tiered levels of decision making. This integration might be needed for first CCS projects as decisions on the strategic (spatial planning) level are currently absent for CCS in the Netherlands. Perpendicular to such integration is the integration of linked activities in the CCS chain and their alternatives, into one procedure. We argue that it would be beneficial to combine the separate EIA procedures for CCS activities into one procedure or at least provide close linkage between them. This issue should be carefully considered by regulators, competent authorities and project initiators in an early stage to avoid delaying legal procedures in the future. For the same reason

  17. Canadian Environmental Assessment Act : A comprehensive study report on the Peribonka hydroelectric power project

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents the results of an environmental assessment of Hydro-Quebec's proposed project to build a new facility on the Peribonka River. The facility includes a run-of-river generating station with an installed capacity of 385 MW. The Quebec Region of the Department of Fisheries and Oceans Canada has conducted an environmental assessment of the project's effects. A summary of the project and the environment in which it will be carried out was presented along with the results of public consultations conducted by Hydro-Quebec. A summary of the main environmental effects was included along with cumulative effects and the effects caused by accidents or malfunctions that may occur. In addition, the terms and conditions of mitigation measures and follow-up programs were described and the significance of any environmental impacts were assessed. The project includes the construction of a 80 metre high dam, two dikes and one spillway upstream of the mouth of the Manouane River. The level of the reservoir would remain at close to its maximum level of 244.2 metres to optimize hydroelectric production. The power house would be integrated into the Hydro-Quebec transmission network. The main impacts of the project would result from the construction of the reservoir, the encroachment caused by associated facilities and the changes in hydrological conditions. This report outlined the current use of lands and resources for traditional purposes by Aboriginals. It also discussed the effects of natural events such as flooding, waves and climate that may cause damage to the facilities. It was determined that the project is not likely to cause significant effects on the renewable resources of the forest and the fisheries. The Department of Fisheries and Oceans, after having taking into account proposed mitigation measures, has rendered a preliminary conclusion which states that the project is not likely to have significant negative environmental effects. 29 refs., 7 tabs., 2

  18. Environmental impact and benefit from hydro-energy: Bulgarian case

    International Nuclear Information System (INIS)

    Vesselinov, V.; Iotova, A.

    1996-01-01

    The present hydro energy system in Bulgaria has been constructed mainly in the period 1950-1965. The currently utilized hydro-power potential, only 33% of the estimated technical potential, includes 87 HPP operating in 1991. A complex assessment of the environmental impact of the hydro energy objects as well as a comparative analysis of all energy sources in Bulgaria is made in the framework of Bulgarian Case Study of the DECADES Inter-Agency Project. The main types of environmental impact related to HPP operation are presented in 7 specific categories: land requirements, changes in the landscape, hydrological changes, micro-climatic changes, geodynamic changes, risk from man-made activities; generation of new ecosystems. A technique of expertise in ball is proposed as a suitable quantitative approach for more precise assessment of impact on climate factors from different energy sources. 2 tabs., 5 refs

  19. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  20. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  1. 76 FR 64991 - Environmental Assessment for the I-395 Air Rights Project

    Science.gov (United States)

    2011-10-19

    ... FHWA Environmental Impact and Related Procedures. The project is also being reviewed under Section 106... copies of the EA may also be viewed at the following locations: Federal Highway Administration (FHWA.... Martin Luther King, Jr. Memorial Library, 901 G Street, NW., Washington, DC 20001. Walker Jones Education...

  2. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  3. Environmental Impact Assessment: A Procedure.

    Science.gov (United States)

    Stover, Lloyd V.

    Prepared by a firm of consulting engineers, this booklet outlines the procedural "whys and hows" of assessing environmental impact, particularly for the construction industry. Section I explores the need for environmental assessment and evaluation to determine environmental impact. It utilizes a review of the National Environmental Policy Act and…

  4. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    Since the 1930's, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M ampersand I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M ampersand I studies; Irrigation/M ampersand I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M ampersand I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement

  5. A multi-scale metrics approach to forest fragmentation for Strategic Environmental Impact Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Eunyoung, E-mail: eykim@kei.re.kr [Korea Environment Institute, 215 Jinheungno, Eunpyeong-gu, Seoul 122-706 (Korea, Republic of); Song, Wonkyong, E-mail: wksong79@gmail.com [Suwon Research Institute, 145 Gwanggyo-ro, Yeongtong-gu, Suwon-si, Gyeonggi-do 443-270 (Korea, Republic of); Lee, Dongkun, E-mail: dklee7@snu.ac.kr [Department of Landscape Architecture and Rural System Engineering, Seoul National University, 599 Gwanakro, Gwanak-gu, Seoul 151-921 (Korea, Republic of); Research Institute for Agriculture and Life Sciences, Seoul National University, Seoul 151-921 (Korea, Republic of)

    2013-09-15

    Forests are becoming severely fragmented as a result of land development. South Korea has responded to changing community concerns about environmental issues. The nation has developed and is extending a broad range of tools for use in environmental management. Although legally mandated environmental compliance requirements in South Korea have been implemented to predict and evaluate the impacts of land-development projects, these legal instruments are often insufficient to assess the subsequent impact of development on the surrounding forests. It is especially difficult to examine impacts on multiple (e.g., regional and local) scales in detail. Forest configuration and size, including forest fragmentation by land development, are considered on a regional scale. Moreover, forest structure and composition, including biodiversity, are considered on a local scale in the Environmental Impact Assessment process. Recently, the government amended the Environmental Impact Assessment Act, including the SEA, EIA, and small-scale EIA, to require an integrated approach. Therefore, the purpose of this study was to establish an impact assessment system that minimizes the impacts of land development using an approach that is integrated across multiple scales. This study focused on forest fragmentation due to residential development and road construction sites in selected Congestion Restraint Zones (CRZs) in the Greater Seoul Area of South Korea. Based on a review of multiple-scale impacts, this paper integrates models that assess the impacts of land development on forest ecosystems. The applicability of the integrated model for assessing impacts on forest ecosystems through the SEIA process is considered. On a regional scale, it is possible to evaluate the location and size of a land-development project by considering aspects of forest fragmentation, such as the stability of the forest structure and the degree of fragmentation. On a local scale, land-development projects should

  6. 46 CFR 504.7 - Environmental impact statements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Environmental impact statements. 504.7 Section 504.7... POLICY ANALYSIS § 504.7 Environmental impact statements. (a) General. (1) An environmental impact... environmental impact statements. (1) A draft environmental impact statement (DEIS) will initially be prepared in...

  7. Environmental impact analysis; the example of the proposed Trans-Alaska Pipeline

    Science.gov (United States)

    Brew, David A.

    1974-01-01

    The environmental impact analysis made as required by the National Environmental Policy Act of 1969 for the proposed trans-Alaska pipeline included consideration of the (1) technologically complex and geographically extensive proposed project, (2) extremely different physical environments across Alaska along the proposed route and elsewhere in Alaska and in Canada along alternative routes, (3) socioeconomic environment of the State of Alaska, and (4) a wide variety of alternatives. The analysis was designed specifically to fit the project and environment that would be affected. The environment was divided into two general parts--natural physical systems and superposed socioeconomic systems--and those parts were further divided into discipline-oriented systems or components that were studied and analyzed by scientists of the appropriate discipline. Particular attention was given to potential feedback loops in the impact network and to linkages between the project's impacting effects and the environment. The results of the analysis as reported in the final environmental impact statement were that both unavoidable and threatened environmental impacts would result from construction, operation, and maintenance of the proposed pipeline system and the developments related to it. The principal unavoidable effects would be (1) disturbances of terrain, fish and wildlife habitat, and human environs, (2) the results of the discharge of effluent from the tanker-ballast-treatment facility into Port Valdez and of some indeterminate amount of oil released into the ocean from tank-cleaning operations at sea, and (3) the results associated with increased human pressures of all kinds on the environment. Other unavoidable effects would be those related to increase of State and Native Corporation revenues, accelerated cultural change of the Native population, and extraction of the oil and gas resource. The main threatened environmental effects would all be related to unintentional oil

  8. The Xanton-Chassenon II wind farm site - Non technical summary of the impact study, opinion of the environmental authority, public inquiry, additional impact study on avifauna after the opinion of the environmental authority, analysis of chiropterans activity in altitude

    International Nuclear Information System (INIS)

    2013-01-01

    A first document aims at public information and consultation by proposing a synthetic overview of the wind farm project. It presents the involved actors, the methodology adopted to select the site and the project scenario. It describes the actual project (wind turbines, agreement, exploitation duration, compliance with urban planning documents), gives an overview of the results of the impact study (social-economic impacts, impacts on the environment, on landscape and heritage, on acoustics, on health, climate and air quality, and soil and water). It indicates measures aimed at avoiding, reducing or compensating drawbacks. The official opinion of the environmental authority is then provided. The public enquiry process is reported, with a presentation of various studied impacts, an overview of public opinion expressions and of counter-proposals. A detailed additional impact study regarding avifauna is provided as an answer to the opinion of the environmental authority. Another opinion of the environmental authority on the exploitation authorisation request is provided. The last report contains an analysis of chiropterans activity in altitude (methodology, ecological diagnosis)

  9. A numerical calculation method of environmental impacts for the deep sea mining industry - a review.

    Science.gov (United States)

    Ma, Wenbin; van Rhee, Cees; Schott, Dingena

    2018-03-01

    Since the gradual decrease of mineral resources on-land, deep sea mining (DSM) is becoming an urgent and important emerging activity in the world. However, until now there has been no commercial scale DSM project in progress. Together with the reasons of technological feasibility and economic profitability, the environmental impact is one of the major parameters hindering its industrialization. Most of the DSM environmental impact research focuses on only one particular aspect ignoring that all the DSM environmental impacts are related to each other. The objective of this work is to propose a framework for the numerical calculation methods of the integrated DSM environmental impacts through a literature review. This paper covers three parts: (i) definition and importance description of different DSM environmental impacts; (ii) description of the existing numerical calculation methods for different environmental impacts; (iii) selection of a numerical calculation method based on the selected criteria. The research conducted in this paper provides a clear numerical calculation framework for DSM environmental impact and could be helpful to speed up the industrialization process of the DSM industry.

  10. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  11. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  12. The environmental impact assessment process for nuclear facilities: An examination of the Indian experience

    International Nuclear Information System (INIS)

    Ramana, M.V.; Rao, Divya Badami

    2010-01-01

    India plans to construct numerous nuclear plants and uranium mines across the country, which could have significant environmental, health, and social impacts. The national Environmental Impact Assessment process is supposed to regulate these impacts. This paper examines how effective this process has been, and the extent to which public inputs have been taken into account. In addition to generic problems associated with the EIA process for all kinds of projects in India, there are concerns that are specific to nuclear facilities. One is that some nuclear facilities are exempt from the environmental clearance process. The second is that data regarding radiation baseline levels and future releases, which is the principle environmental concern with respect to nuclear facilities, is controlled entirely by the nuclear establishment. The third is that members of the nuclear establishment take part in almost every level of the environmental clearance procedure. For these reasons and others, the EIA process with regard to nuclear projects in India is of dubious quality. We make a number of recommendations that could address these lacunae, and more generally the imbalance of power between the nuclear establishment on the one hand, and civil society and the regulatory agencies on the other.

  13. The influence of incomplete or unavailable information on environmental impact assessment in the USA

    International Nuclear Information System (INIS)

    Atkinson, Samuel F.; Canter, Larry W.; Ravan, Melanie D.

    2006-01-01

    One of the more common activities of environmental scientists in the United States is the preparation of environmental assessments or environmental impact statements in response to the mandates of the National Environmental Policy Act. The central thesis of this paper revolves around a frequent dilemma those scientists face: how to proceed with the environmental impact analysis when information on potential impacts is incomplete or unavailable. The paper examines how the 'hard look' standard that U.S. courts have imposed upon agencies considering proposed actions came about. Further, U.S. courts have said agencies cannot make arbitrary and capricious decisions when deciding to build a project, implement a plan, issue a permit or other give other approvals, and this paper discusses how the courts have defined what arbitrary and capricious decision are, especially when decisions are made when information about impacts is incomplete or unavailable. The paper examines why agencies win or lose lawsuits filed against the environmental assessments or environmental impact statements they write, focusing on those cases that have occurred after the Supreme Court ruled on the issue in 1989. The paper suggests recommendations to environmental scientists faced with incomplete or unavailable information when preparing an environmental assessment or environmental impact statement in the U.S

  14. Environmental impact assessment of the industrial estate development plan with the geographical information system and matrix methods.

    Science.gov (United States)

    Ghasemian, Mohammad; Poursafa, Parinaz; Amin, Mohammad Mehdi; Ziarati, Mohammad; Ghoddousi, Hamid; Momeni, Seyyed Alireza; Rezaei, Amir Hossein

    2012-01-01

    The purpose of this study is environmental impact assessment of the industrial estate development planning. This cross-sectional study was conducted in 2010 in Isfahan province, Iran. GIS and matrix methods were applied. Data analysis was done to identify the current situation of the region, zoning vulnerable areas, and scoping the region. Quantitative evaluation was done by using matrix of Wooten and Rau. The net score for impact of industrial units operation on air quality of the project area was (-3). According to the transition of industrial estate pollutants, residential places located in the radius of 2500 meters of the city were expected to be affected more. The net score for impact of construction of industrial units on plant species of the project area was (-2). Environmental protected areas were not affected by the air and soil pollutants because of their distance from industrial estate. Positive effects of project activities outweigh the drawbacks and the sum scores allocated to the project activities on environmental factor was (+37). Totally it does not have detrimental effects on the environment and residential neighborhood. EIA should be considered as an anticipatory, participatory environmental management tool before determining a plan application.

  15. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  16. 77 FR 20411 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southline...

    Science.gov (United States)

    2012-04-04

    ... Cruces District Office, Las Cruces, New Mexico, intends to prepare an Environmental Impact Statement (EIS... Administration [LLNM930000 L51010000.ER0000 LVRWG11G0790 NMNM124104] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southline Transmission Line Project in New Mexico and Arizona (DOE/EIS...

  17. Environmental assessment of the projected uses for geopressured waters

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, J.S.; Manning, J.A.; Meriwether, J.

    1977-11-16

    An assessment of possible environmental effects of the use of geopressured water of the Texas and Louisiana Gulf Coast has been made. The uses considered include generation of electric power, production of low pressure steam for process heat and the direct use of the hot water for space heating. Based upon the projected uses, the direct and indirect emissions are estimated and the impact of these emissions upon the environment are discussed. The possible impacts of the production of large volumes of geopressured fluids are also considered in terms of possibility of subsidence and earthquakes. A summary of available analyses of Gulf Coast deep waters is listed as a guide for estimating expected emissions. Primary environmental problems are identified as waste brine disposal, accidental releases of brines, and subsidence. Minor problems such as cooling tower blowdown streams, noncondensable gas emissions, wind drift from exhaust plumes, noise levels, and construction activities are considered.

  18. Environmental Impact Assessment and Space Activities

    Science.gov (United States)

    Viikari, L.

    Environmental Impact Assessment (EIA) is a common tool for environment a l protection and management on Earth today, as prior assessment of the environmental consequences of planned activities. It is meant to provide the decision-makers with as comprehensive as possible information about the different environmental effects the proposed activity would entail, including alternative courses of action and the zero-alternative (i.e. the no action alternative). Additionally, plans for mitigation in respect of each alternative are to be outlined. The assessments take account of i.a. environmental impacts on ecosystems, diminution of aesthetic and scientific values, long-term or cumulative effects, as well as transfrontier implications. They also consider issues such as pollution control, environmental protection measures, reporting, post-project analysis, rehabilitation and so on. Also uncertainties in the assessment process are to be expressly presented. Most importantly, a common requirement also is that the results of the impact studies are presented in a way comprehensible to the g neral public,e too. Although the central aspect of the EIA is to provide the decision-makers with scientific information, the process also has other important implications. One of the most relevant of them is the involvement of those people potentially affected in some way by the proposed activity: most EIA systems require in some way the participation of the public, alongside with the relevant governmental authorities and other stake-holders. Such public involvement has various aims and goals: it may serve as a testimony to good governance in general, or be considered in more practical terms as improved planning, due to the concrete contribution of the public to the decision-making process. Obviously, it also is a tool for reducing conflict and developing wider support for the eventual decisions. In short, it enables the public to gain information about planned activities and influence

  19. External communication in environmental projects; La comunicacion externa en los proyectos ambientales

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz Feltrer, C.

    2004-07-01

    The public's awareness of industrial projects is constantly growing. In addition, if such project imply any sort of environmental impact, their awareness increases and may result in a series of deterrents to the start-up of the said projects. The present article focuses on one of the most powerful of management tools through, at the same time, the one most often forgotten by companies: external communication. In the first part of the article, we shall analyse the reasons why many industrial projects never actually see the light of day. Starting from three working hypotheses, we came to the conclusion that we must be proactive in our communication if we wish our development to be durable and to last. In the second part, we put forward a method for planning communication aimed at first of all, foreseeing, and, ultimately, solving situations arising from the deterrents already mentioned. We have used a classical planning model from which to develop a specific application called Environmental Communication. (Author)

  20. Modeling the determinants of the social impacts of agricultural development projects

    International Nuclear Information System (INIS)

    Ahmadvand, Mostafa; Karami, Ezatollah; Iman, Mohammad Taghi

    2011-01-01

    In an attempt to help policy-makers improve the social sustainability of development projects, this study identifies the key determinants of farmers' attitudes relating to the social impacts of the floodwater spreading project (FWSP) on the Gareh-Bygone plain in Iran. In order to analyze the links between the various factors that affect the experience of social impact, a theoretical framework was developed. Stratified random sampling was used to survey 138 farm households from the four villages in the region. One male and one female from each house were interviewed face-to-face using a questionnaire, resulting in a total of 276 interviews. Structural factors were found to be the largest contribution to stakeholders' attitudes relating to the social impacts of the project. Results from a cluster analysis suggested that the level of floodwater information, level of participation, water access, ownership change, and environmental worldview were the most important factors explaining attitude towards social impact of the FWSP.

  1. Comfort monitoring? Environmental assessment follow-up under community-industry negotiated environmental agreements

    International Nuclear Information System (INIS)

    Noble, Bram; Birk, Jasmine

    2011-01-01

    Negotiated environmental agreements are becoming common practice in the mining industry. In principle, negotiated environmental agreements are said to respond to many of the shortcomings of environmental impact assessment by providing for improved follow-up of project impacts through, among other things, data provision, engaging stakeholders in the monitoring and management of project impacts, and building capacity at the local level to deal with project-induced environmental change. In practice, however, little is known about the efficacy of follow-up under negotiated environmental agreements between proponents and communities and the demonstrated value added to project impact management. This paper examines follow-up practice under negotiated environmental agreements with a view to understanding whether and how community-based monitoring under privatized agreements actually contributes to improved follow-up and impact management. Based on lessons emerging from recent experiences with environmental agreements in Canada's uranium industry, we show that follow-up under negotiated agreements may be described as 'comfort monitoring'. While such monitoring does improve community-industry relations and enhance corporate image, it does little to support effects-based management. If follow-up under negotiated agreements is to be credible over the long term, there is a need to ensure that monitoring results are useful for, and integrated with, regulatory-based monitoring and project impact management practices.

  2. Integrated manure management to reduce environmental impact: II. Environmental impact assessment of strategies

    NARCIS (Netherlands)

    Vries, de J.W.; Groenestein, C.M.; Schroder, J.J.; Hoogmoed, W.B.; Sukkel, W.; Groot Koerkamp, P.W.G.; Boer, de I.J.M.

    2015-01-01

    Manure management contributes to adverse environmental impacts through losses of nitrogen (N), phosphorus, and carbon (C). In this study, we aimed to assess the potential of newly designed strategies for integrated manure management (IS) to reduce environmental impact. An important aspect of the

  3. Maine Tidal Power Initiative: Environmental Impact Protocols For Tidal Power

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, Michael Leroy [Univ. of Maine, Orono, ME; Zydlewski, Gayle Barbin [Univ. of Maine, Orono, ME; Xue, Huijie [Univ. of Maine, Orono, ME; Johnson, Teresa R. [Univ. of Maine, Orono, ME

    2014-02-02

    The Maine Tidal Power Initiative (MTPI), an interdisciplinary group of engineers, biologists, oceanographers, and social scientists, has been conducting research to evaluate tidal energy resources and better understand the potential effects and impacts of marine hydro-kinetic (MHK) development on the environment and local community. Project efforts include: 1) resource assessment, 2) development of initial device design parameters using scale model tests, 3) baseline environmental studies and monitoring, and 4) human and community responses. This work included in-situ measurement of the environmental and social response to the pre-commercial Turbine Generator Unit (TGU®) developed by Ocean Renewable Power Company (ORPC) as well as considering the path forward for smaller community scale projects.

  4. Assessment of potential economic and environmental impacts caused by Phytophthora ramorum in Europe

    Science.gov (United States)

    Hella Kehlenbeck

    2008-01-01

    Economic and environmental impacts of Phytophthora ramorum in Europe were evaluated within the European Union framework 6 project on ?Risk Analysis for P. ramorum a pathogen threat to Europe? (RAPRA). Impact assessment was conducted according to three different scenarios: 1. ?Nursery System? - describes losses occurring in...

  5. 76 FR 336 - Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) for PacRim Coal's Proposed...

    Science.gov (United States)

    2011-01-04

    ... Environmental Impact Statement (SEIS) for PacRim Coal's Proposed Chuitna Coal Project AGENCY: U.S. Army Corps of... Chuitna Coal Project. It is anticipated that the Environmental Protection Agency (EPA), the Native Village... the Alaska Surface Coal Mining Control and Reclamation Act (ASCMCRA) permit, which governs all aspects...

  6. Eastmain-1-A powerhouse and Rupert diversion : environmental impact statement : summary report

    International Nuclear Information System (INIS)

    2004-12-01

    Following an agreement signed in 2002 between the Government of Quebec and the Crees of Quebec, Hydro-Quebec plans to launch the Eastmain-1-A powerhouse and Rupert diversion project scheduled for commissioning in 2010-2011. The project involves building powerhouses and diverting part of the flow from the river into a reservoir to drive turbines at several powerhouses before being channelled to three existing generating stations. This project also requires building a series of hydraulic structures to direct the flow and keep the water diverted. The project also calls for the construction of a new drinking water plant at Waskaganish. The report first presents a justification and description of the project including: purpose, distributor needs, electricity exports and markets outside Quebec, economic aspects, description of the Rupert diversion and powerhouses, roadways, work camps, project schedule and costs. Next, the report provides the study area boundaries and a description of the biophysical and human environment including such topics as climate, hydrography, hydrology and hydraulics, geology and geomorphology, fish, vegetation, wildlife, and birds. Issues regarding the cultural environment, land use, heritage, and landscape were also addressed. The report also discusses public participation issues such as: conservation of fish and fish habitats in the Rupert River; continuation of Cree hunting, fishing and trapping; recreational and scenic values of the Rupert River; and, economic spinoffs for Cree and Jamesian communities. A summary of environmental impacts is provided including sources of impact; modifications to the physical environment; biological impacts; and, impacts on the human environment. Highlights by Cree community are then presented. Mitigation, compensation and enhancement measures and environmental compliance and follow-up programs are also discussed. 20 tabs., 7 figs

  7. The Environmental Health/Home Safety Education Project: a successful and practical U.S.-Mexico border initiative.

    Science.gov (United States)

    Forster-Cox, Susan C; Mangadu, Thenral; Jacquez, Benjamín; Fullerton, Lynne

    2010-05-01

    The Environmental Health/Home Safety Education Project (Proyecto de Salud Ambiental y Seguridad en el Hogar) has been developed in response to a wide array of severe and often preventable environmental health issues occurring in and around homes on the U.S.-Mexico border. Utilizing well-trained community members, called promotoras , homes are visited and assessed for potential environmental hazards, including home fire and food safety issues. Data analyzed from project years 2002 to 2005 shows a significant impact in knowledge levels and initial behavior change among targeted participants as it relates to fire and food safety issues. Since the initiation of the project in 1999, hundreds of participants have improved their quality of life by making their homes safer. The project has proven to be sustainable, replicable, flexible, and attractive to funders.

  8. 21 CFR 25.42 - Environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Environmental impact statements. 25.42 Section 25... ENVIRONMENTAL IMPACT CONSIDERATIONS Preparation of Environmental Documents § 25.42 Environmental impact... be a clear, concise, and detailed written statement describing: (1) The environmental impacts of a...

  9. 75 FR 44008 - Revised Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Boardman...

    Science.gov (United States)

    2010-07-27

    ... Prepare an Environmental Impact Statement for the Proposed Boardman to Hemingway 500 Kilovolt Transmission..., intend to prepare an Environmental Impact Statement (EIS) for the Boardman to Hemingway (B2H) Project... for construction by IPC between the existing Hemingway substation, located near Melba in Owyhee County...

  10. Environmental impact assessment using a utility-based recursive evidential reasoning approach for structural flood mitigation measures in Metro Manila, Philippines.

    Science.gov (United States)

    Gilbuena, Romeo; Kawamura, Akira; Medina, Reynaldo; Nakagawa, Naoko; Amaguchi, Hideo

    2013-12-15

    In recent years, the practice of environmental impact assessment (EIA) has created significant awareness on the role of environmentally sound projects in sustainable development. In view of the recent studies on the effects of climate change, the Philippine government has given high priority to the construction of flood control structures to alleviate the destructive effects of unmitigated floods, especially in highly urbanized areas like Metro Manila. EIA thus, should be carefully and effectively carried out to maximize or optimize the potential benefits that can be derived from structural flood mitigation measures (SFMMs). A utility-based environmental assessment approach may significantly aid flood managers and decision-makers in planning for effective and environmentally sound SFMM projects. This study proposes a utility-based assessment approach using the rapid impact assessment matrix (RIAM) technique, coupled with the evidential reasoning approach, to rationally and systematically evaluate the ecological and socio-economic impacts of 4 planned SFMM projects (i.e. 2 river channel improvements and 2 new open channels) in Metro Manila. Results show that the overall environmental effects of each of the planned SFMM projects are positive, which indicate that the utility of the positive impacts would generally outweigh the negative impacts. The results also imply that the planned river channel improvements will yield higher environmental benefits over the planned open channels. This study was able to present a clear and rational approach in the examination of overall environmental effects of SFMMs, which provides valuable insights that can be used by decision-makers and policy makers to improve the EIA practice and evaluation of projects in the Philippines. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This Annual Site Environmental Report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2003 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. During 2003, cleanup of radioactive waste from the former nuclear fuels reprocessing plant that shut down operations in the 1970s was continued at the WVDP. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority. Work activities at the WVDP during 2003 included: (1) maintaining canisters of vitrified high-level waste in a shielded facility; (2) shipping low-level radioactive waste offsite for disposal; (3) shipping packaged spent nuclear fuel assemblies to Idaho National Engineering and Environmental Laboratory; (4) constructing a facility where large high-activity components can be safely size-reduced and packaged for disposal; (5) decontaminating the fuel storage pool and the cask unloading pool; (6) decontaminating the general purpose cell and the process mechanical cell (also referred to as the head end cells); (7) cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (8) planning for decontamination and dismantlement of the vitrification facility; (9) continuing preparation of the Decommissioning and/or Long-Term Stewardship Environmental Impact Statement; and (10) monitoring the environment and managing contaminated areas within the Project facility premises

  12. Decree Law No. 38/90 of 8 November 1990 providing for environmental impact assessments

    International Nuclear Information System (INIS)

    1990-01-01

    This Decree, made in implementation of Decree-Law No. 186/90 on environmental protection, provides that prior to any licence being granted to any project, including nuclear installations, the licensing authority must be provided with an environmental impact study of the planned installation. This study must include a description of the project, its site, its operational characteristics, physical, geological, hydrological, ecological, demographic data, as well as information on the quality of the environment [fr

  13. Environmental impacts of climate change adaptation

    Energy Technology Data Exchange (ETDEWEB)

    Enríquez-de-Salamanca, Álvaro, E-mail: aenriquez@draba.org [Universidad Nacional de Educación a Distancia (UNED)/Draba Ingeniería y Consultoría Medioambiental, Cañada Nueva, 13, 28200 San Lorenzo de El Escorial (Spain); Díaz-Sierra, Rubén, E-mail: sierra@dfmf.uned.es [Departamento de Física Matemática y de Fluidos, Facultad de Ciencias, Universidad Nacional de Educación a Distancia (UNED), Paseo Senda del Rey, 9, 28040 Madrid (Spain); Martín-Aranda, Rosa M., E-mail: rmartin@ccia.uned.es [Departamento de Química Inorgánica y Química Técnica, Facultad de Ciencias, Universidad Nacional de Educación a Distancia (UNED), Paseo Senda del Rey, 9, 28040 Madrid (Spain); Santos, Maria J., E-mail: M.J.FerreiraDosSantos@uu.nl [Department of Innovation, Environmental and Energy Sciences, Utrecht University, Heidelberglaan 2, 3572 TC Utrecht (Netherlands)

    2017-05-15

    Climate change adaptation reduces adverse effects of climate change but may also have undesirable environmental impacts. However, these impacts are yet poorly defined and analysed in the existing literature. To complement this knowledge-gap, we reviewed the literature to unveil the relationship between climate change adaptation and environmental impact assessment, and the degree to which environmental impacts are included in climate change adaptation theory and practice. Our literature review showed that technical, social and economic perspectives on climate change adaptation receive much more attention than the environmental perspective. The scarce interest on the environmental impacts of adaptation may be attributed to (1) an excessive sectoral approach, with dominance of non-environmental perspectives, (2) greater interest in mitigation and direct climate change impacts rather than in adaptation impacts, (3) a tendency to consider adaptation as inherently good, and (4) subjective/preconceived notions on which measures are good or bad, without a comprehensive assessment. Environmental Assessment (EA) has a long established history as an effective tool to include environment into decision-making, although it does not yet guarantee a proper assessment of adaptation, because it is still possible to postpone or even circumvent the processes of assessing the impacts of climate adaptation. Our results suggest that there is a need to address adaptation proactively by including it in EA, to update current policy frameworks, and to demand robust and reliable evaluation of alternatives. Only through the full EA of adaptation measures can we improve our understanding of the primary and secondary impacts of adaptation to global environmental change. - Highlights: • Climate change adaptation may have undesirable environmental impacts. • The impacts of adaptation are yet poorly analysed in the literature. • There is an excessive sectoral approach to adaptation, mainly

  14. Environmental impacts of climate change adaptation

    International Nuclear Information System (INIS)

    Enríquez-de-Salamanca, Álvaro; Díaz-Sierra, Rubén; Martín-Aranda, Rosa M.; Santos, Maria J.

    2017-01-01

    Climate change adaptation reduces adverse effects of climate change but may also have undesirable environmental impacts. However, these impacts are yet poorly defined and analysed in the existing literature. To complement this knowledge-gap, we reviewed the literature to unveil the relationship between climate change adaptation and environmental impact assessment, and the degree to which environmental impacts are included in climate change adaptation theory and practice. Our literature review showed that technical, social and economic perspectives on climate change adaptation receive much more attention than the environmental perspective. The scarce interest on the environmental impacts of adaptation may be attributed to (1) an excessive sectoral approach, with dominance of non-environmental perspectives, (2) greater interest in mitigation and direct climate change impacts rather than in adaptation impacts, (3) a tendency to consider adaptation as inherently good, and (4) subjective/preconceived notions on which measures are good or bad, without a comprehensive assessment. Environmental Assessment (EA) has a long established history as an effective tool to include environment into decision-making, although it does not yet guarantee a proper assessment of adaptation, because it is still possible to postpone or even circumvent the processes of assessing the impacts of climate adaptation. Our results suggest that there is a need to address adaptation proactively by including it in EA, to update current policy frameworks, and to demand robust and reliable evaluation of alternatives. Only through the full EA of adaptation measures can we improve our understanding of the primary and secondary impacts of adaptation to global environmental change. - Highlights: • Climate change adaptation may have undesirable environmental impacts. • The impacts of adaptation are yet poorly analysed in the literature. • There is an excessive sectoral approach to adaptation, mainly

  15. Golbal Economic and Environmental Impacts of Increased Bioenergy Production

    Energy Technology Data Exchange (ETDEWEB)

    Wallace Tyner

    2012-05-30

    The project had three main objectives: to build and incorporate an explicit biomass energy sector within the GTAP analytical framework and data base; to provide an analysis of the impact of renewable fuel standards and other policies in the U.S. and E.U, as well as alternative biofuel policies in other parts of the world, on changes in production, prices, consumption, trade and poverty; and to evaluate environmental impacts of alternative policies for bioenergy development. Progress and outputs related to each objective are reported.

  16. Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, Sharon; Previsic, Mirko; Nelson, Peter; Woo, Sheri

    2010-06-17

    Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry in the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal

  17. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    Federal action triggering the preparation of this EA is the need for DOE to decide whether to release the requested funding to support the construction of the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  18. 76 FR 55890 - Cancellation of Supplemental Environmental Impact Statement for Ancillary Facilities for the...

    Science.gov (United States)

    2011-09-09

    ... (SPR). In April 2011, Congress rescinded all funding for the SPR expansion project. FOR FURTHER... included no new funding to continue SPR expansion efforts and proposed cancellation of previously... expansion project, DOE prepared an environmental impact statement for the Site Selection for the Expansion...

  19. Strategic environmental assessment can help solve environmental impact assessment failures in developing countries

    International Nuclear Information System (INIS)

    Alshuwaikhat, Habib M.

    2005-01-01

    The current trend of industrialization and urbanization in developing nations has a huge impact on anthropogenic and natural ecosystems. Pollution sources increase with the expansion of cities and cause contamination of water, air and soil. The absence of urban environmental planning and management strategies has resulted in greater concern for future urban development. This paper advocates the adoption of strategic environmental assessment (SEA) as a means to achieve sustainable development in developing countries. It investigates project-level environmental impact assessment (EIA) and its limitations. The exploration of SEA and its features are addressed. The effective implementation of SEA can create a roadmap for sustainable development. In many developing countries, the lack of transparency and accountability and ineffective public participation in the development of the policy, plan and program (PPP) would be mitigated by the SEA process. Moreover, the proactive and broadly based characteristics of SEA would benefit the institutional development of the PPP process, which is rarely experienced in many developing countries. The paper also explores the prospects for SEA and its guiding principles in developing countries. Finally, the paper calls for a coordinated effort between all government, nongovernment and international organizations involved with PPPs to enable developing countries to pursue a path of sustainable development through the development and application of strategic environmental assessment

  20. CERCLA-linked environmental impact and benefit analysis: Evaluating remedial alternatives for the Portland Harbor Superfund Site, Portland, Oregon, USA.

    Science.gov (United States)

    McNally, Amanda D; Fitzpatrick, Anne G; Mirchandani, Sera; Salmon, Matthew; Edwards, Deborah A

    2018-01-01

    This analysis focused on evaluating the environmental consequences of remediation, providing indicators for the environmental quality pillar of 3 "pillars" of the Portland Harbor Sustainability Project (PHSP) framework (the other 2 pillars are economic viability and social equity). The project an environmental impact and benefit analysis (EIBA) and an EIBA-based cost-benefit analysis. Metrics developed in the EIBA were used to quantify and compare remedial alternatives' environmental benefits and impacts in the human and ecological domains, as a result of remedial actions (relative to no action). The cost-benefit results were used to evaluate whether remediation costs were proportionate or disproportionate to the environmental benefits. Alternatives B and D had the highest overall benefit scores, and Alternative F was disproportionately costly relative to its achieved benefits when compared to the other remedial alternatives. Indeed, the costlier alternatives with larger remedial footprints had lower overall EIBA benefit scores-because of substantially more air emissions, noise, and light impacts, and more disturbance to business, recreational access, and habitat during construction-compared to the less costly and smaller alternatives. Put another way, the adverse effects during construction tended to outweigh the long-term benefits, and the net environmental impacts of the larger remedial alternatives far outweighed their small incremental improvements in risk reduction. Results of this Comprehensive Environmental Response Compensation and Liability Act (CERCLA)-linked environmental analysis were integrated with indicators of economic and social impacts of remediation in a stakeholder values-based sustainability framework. These tools (EIBA, EIBA-based cost-benefit analysis, economic impact assessment, and the stakeholder values-based integration) provide transparent and quantitative evaluations of the benefits and impacts associated with remedial alternatives

  1. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  2. 77 FR 24976 - Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino...

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights, Spokane... Impact Statement (DEIS) for the Spokane Tribe of Indians West Plains casino and mixed use project, City...

  3. Economic and environmental evaluation of investment projects of biogas plants

    International Nuclear Information System (INIS)

    Guzmán Marrero, Elizabeth; Guzmán Chinea, Jesús Manuel; Mata Varela, Milagros C.; Pérez González, Yanet

    2015-01-01

    The economic evaluation of the implementation and use of renewable energy is an issue of paramount importance and has been approached from different perspectives by different authors in different countries. Biogas technology has its own characteristics that make it more complex analysis involved not only in this case the energy aspect but there is also a significant impact on health assessment difficult, fertilization, soil improvement, animal feed and improved conditions of life. The capital budgeting, in conjunction with the planning process, is a key economic tool for decision making and in turn represents an ongoing challenge for the agricultural sector. It is a necessity of our country, together with the entire world, potentiate the action to correct management of organic waste generated in intensive pig farming, to contribute to the reduction of environmental impacts that this work causes. Studies in this area show the shortcomings that exist in Cuban law established for the evaluation of investment projects, both in its structure and in its cycle, without taking into account important elements such as risk analysis. This research evaluates the economic and financial feasibility of an investment project, including a social and environmental assessment of the same financial justification for the inclusion of risk analysis in the evaluation process (full text)

  4. ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES

    International Nuclear Information System (INIS)

    Phillips, Ann Marie

    2003-01-01

    This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D and D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D and D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D and D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D and D basic research projects will directly impact and provide solutions to DOE's D and D problems

  5. ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Ann Marie

    2003-02-27

    This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D&D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D&D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D&D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D&D basic research projects will directly impact and provide solutions to DOE's D&D problems.

  6. 10 CFR 960.3-4 - Environmental impacts.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Environmental impacts. 960.3-4 Section 960.3-4 Energy... REPOSITORY Implementation Guidelines § 960.3-4 Environmental impacts. Environmental impacts shall be... process. The DOE shall mitigate significant adverse environmental impacts, to the extent practicable...

  7. 32 CFR 989.16 - Environmental impact statement.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Environmental impact statement. 989.16 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.16 Environmental impact statement. (a) Certain classes of environmental impacts normally require preparation of an EIS (40 CFR 1501.4). These include...

  8. 22 CFR 216.7 - Environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Environmental impact statements. 216.7 Section... Environmental impact statements. (a) Applicability. An Environmental Impact Statement shall be prepared when... Environmental Impact Statement relating to paragraph (a)(2) of this section shall comply with the CEQ...

  9. Environmental Impact Assessment of the Industrial Estate Development Plan with the Geographical Information System and Matrix Methods

    Science.gov (United States)

    Ghasemian, Mohammad; Poursafa, Parinaz; Amin, Mohammad Mehdi; Ziarati, Mohammad; Ghoddousi, Hamid; Momeni, Seyyed Alireza; Rezaei, Amir Hossein

    2012-01-01

    Background. The purpose of this study is environmental impact assessment of the industrial estate development planning. Methods. This cross-sectional study was conducted in 2010 in Isfahan province, Iran. GIS and matrix methods were applied. Data analysis was done to identify the current situation of the region, zoning vulnerable areas, and scoping the region. Quantitative evaluation was done by using matrix of Wooten and Rau. Results. The net score for impact of industrial units operation on air quality of the project area was (−3). According to the transition of industrial estate pollutants, residential places located in the radius of 2500 meters of the city were expected to be affected more. The net score for impact of construction of industrial units on plant species of the project area was (−2). Environmental protected areas were not affected by the air and soil pollutants because of their distance from industrial estate. Conclusion. Positive effects of project activities outweigh the drawbacks and the sum scores allocated to the project activities on environmental factor was (+37). Totally it does not have detrimental effects on the environment and residential neighborhood. EIA should be considered as an anticipatory, participatory environmental management tool before determining a plan application. PMID:22272210

  10. Environmental Impact Assessment of the Industrial Estate Development Plan with the Geographical Information System and Matrix Methods

    Directory of Open Access Journals (Sweden)

    Mohammad Ghasemian

    2012-01-01

    Full Text Available Background. The purpose of this study is environmental impact assessment of the industrial estate development planning. Methods. This cross-sectional study was conducted in 2010 in Isfahan province, Iran. GIS and matrix methods were applied. Data analysis was done to identify the current situation of the region, zoning vulnerable areas, and scoping the region. Quantitative evaluation was done by using matrix of Wooten and Rau. Results. The net score for impact of industrial units operation on air quality of the project area was (−3. According to the transition of industrial estate pollutants, residential places located in the radius of 2500 meters of the city were expected to be affected more. The net score for impact of construction of industrial units on plant species of the project area was (−2. Environmental protected areas were not affected by the air and soil pollutants because of their distance from industrial estate. Conclusion. Positive effects of project activities outweigh the drawbacks and the sum scores allocated to the project activities on environmental factor was (+37. Totally it does not have detrimental effects on the environment and residential neighborhood. EIA should be considered as an anticipatory, participatory environmental management tool before determining a plan application.

  11. Environmental Impact Assessment of the Industrial Estate Development Plan with the Geographical Information System and Matrix Methods

    International Nuclear Information System (INIS)

    Ghasemian, M.; Poursafa, P.; Amin, O.M.; Rezaei, A.H.; Ziarati, M.; Ghoddousi, H.; Momeni, S.A.; Rezaei, A.H.

    2012-01-01

    Background. The purpose of this study is environmental impact assessment of the industrial estate development planning. Methods. This cross-sectional study was conducted in 2010 in Isfahan province, Iran. GIS and matrix methods were applied. Data analysis was done to identify the current situation of the region, zoning vulnerable areas, and scoping the region. Quantitative evaluation was done by using matrix of Wooten and Rau. Results. The net score for impact of industrial units operation on air quality of the project area was (-3). According to the transition of industrial estate pollutants, residential places located in the radius of 2500 meters of the city were expected to be affected more. The net score for impact of construction of industrial units on plant species of the project area was (-2). Environmental protected areas were not affected by the air and soil pollutants because of their distance from industrial estate. Conclusion. Positive effects of project activities outweigh the drawbacks and the sum scores allocated to the project activities on environmental factor was (+37). Totally it does not have detrimental effects on the environment and residential neighborhood. EIA should be considered as an anticipatory, participatory environmental management tool before determining a plan application

  12. The environmental impacts of windpower development in Vermont: A policy analyses

    Energy Technology Data Exchange (ETDEWEB)

    Goodman, N. [Univ. of Vermont, Burlington, CT (United States)

    1997-12-31

    In the spring of 1996, construction of a six-megawatt wind power facility commenced on a mountain ridge in the town of Searsburgh in southern Vermont. While this process marked the beginning of physical development on the ridge, Green Mountain Power Corporation (GMP) had been planning the process for over 25 years. From wind speed data collection in 1971, to site selection, and environmental studies still ongoing, GMP has sought to increase their renewable energy portfolio by bringing wind power to the state of Vermont. While on the surface, wind power appears to be relatively pollution free, producing no emissions, it should be noted that there are environmental impacts associated with wind power and these would have to be addressed before any substantial development could occur. But how would this happen in Vermont? Power generating facilities are not subject to the Act 250 process; rather they require certification from the Public Service Board (P.S.B.). As the project progressed, questions arose over just how the process would adequately address the environmental impacts associated with developing a remote ridge in southern Vermont. In preparing for and participating in the certification process, GMP identified several environmental impact issues in need of investigation. GMP initiated studies in several fields and hired consultants to investigate these issues with the hope that they would not serve as an impediment to their project. Preliminary analysis revealed the need for in-depth studies in four specific impact areas, including aesthetics, critical wildlife habitat, noise and avian studies. While all participants in the process do not share the same concerns, different stakeholders have raised enough questions to justify a critical look at the certification process.

  13. ENVIRONMENTAL IMPACT ASSESSMENT AND MONITORING ...

    African Journals Online (AJOL)

    protect the environment, it is imperative to conduct environmental impact assessment ... Ethiopia enacted the Environmental Impact Assessment Proclamation in 2002 ... flora, fauna, soil, air, water, climate, natural or cultural heritage, other.

  14. The introductory role of the nuclear energy in the environmental impact development studies

    International Nuclear Information System (INIS)

    Ha-Vinh Phuong.

    1995-01-01

    The nuclear installation regulatory process of authorization normally requires, in good safety practice that the safety analysis of a particular nuclear installation should go along with the environmental impact assessment (EIA). The organization and actions of a programme and inspections for environmental radioactivity are then requirements as conditions that should anticipate the licence authorization. The nuclear energy, in that case, plays an important role for the environment integration in the planning and decisions related to develop projects in ecologically sensible domains. In fact, environmental impact assessment concept was progressively introduced by an increasing number of national regulations to be applied in a large gamma of activities. The impact studies provides a contribution for the global environment management perception an the sustainable economical development interest. 2 tabs

  15. 49 CFR 266.19 - Environmental impact.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Environmental impact. 266.19 Section 266.19... TRANSPORTATION ACT § 266.19 Environmental impact. (a) General. The Administrator has determined that providing..., or other significant adverse environmental impact on any mode of transportation; (6) The action is...

  16. Environmental impacts of thermochemical biomass conversion. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, D.C.; Hart, T.R.; Neuenschwander, G.G.; McKinney, M.D.; Norton, M.V.; Abrams, C.W. [Pacific Northwest Lab., Richland, WA (United States)

    1995-06-01

    Thermochemical conversion in this study is limited to fast pyrolysis, upgrading of fast pyrolysis oils, and gasification. Environmental impacts of all types were considered within the project, but primary emphasis was on discharges to the land, air, and water during and after the conversion processes. The project discussed here is divided into five task areas: (1) pyrolysis oil analysis; (2) hydrotreating of pyrolysis oil; (3) gas treatment systems for effluent minimization; (4) strategic analysis of regulatory requirements; and (5) support of the IEA Environmental Systems Activity. The pyrolysis oil task was aimed at understanding the oil contaminants and potential means for their removal. The hydrotreating task was undertaken to better define one potential means for both improving the quality of the oil but also removing contaminants from the oil. Within Task 3, analyses were done to evaluate the results of gasification product treatment systems. Task 4 was a review and collection of regulatory requirements which would be applicable to the subject processes. The IEA support task included input to and participation in the IEA Bioenergy activity which directly relates to the project subject. Each of these tasks is described along with the results. Conclusions and recommendations from the overall project are given.

  17. Environmental impacts of thermochemical biomass conversion. Final report

    International Nuclear Information System (INIS)

    Elliott, D.C.; Hart, T.R.; Neuenschwander, G.G.; McKinney, M.D.; Norton, M.V.; Abrams, C.W.

    1995-06-01

    Thermochemical conversion in this study is limited to fast pyrolysis, upgrading of fast pyrolysis oils, and gasification. Environmental impacts of all types were considered within the project, but primary emphasis was on discharges to the land, air, and water during and after the conversion processes. The project discussed here is divided into five task areas: (1) pyrolysis oil analysis; (2) hydrotreating of pyrolysis oil; (3) gas treatment systems for effluent minimization; (4) strategic analysis of regulatory requirements; and (5) support of the IEA Environmental Systems Activity. The pyrolysis oil task was aimed at understanding the oil contaminants and potential means for their removal. The hydrotreating task was undertaken to better define one potential means for both improving the quality of the oil but also removing contaminants from the oil. Within Task 3, analyses were done to evaluate the results of gasification product treatment systems. Task 4 was a review and collection of regulatory requirements which would be applicable to the subject processes. The IEA support task included input to and participation in the IEA Bioenergy activity which directly relates to the project subject. Each of these tasks is described along with the results. Conclusions and recommendations from the overall project are given

  18. Draft environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). Houston Lighting and Power Company

    International Nuclear Information System (INIS)

    1986-03-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the ''Code of Federal Regulations,'' Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archaeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  19. Energy Sources Management and Future Automotive Technologies: Environmental Impact

    Directory of Open Access Journals (Sweden)

    Florin Mariasiu

    2012-01-01

    Full Text Available The paper presents the environmental impact created through the introduction of introducing new technologies in transportation domain. New electric vehicles are considered zero-emission vehicles (ZEV. However, electricity produced in power plants is still predominantly based on fossil fuel usage (required for recharge electric vehicle batteries and thus directly affects the quantity of pollutant emissions and greenhouse gases (CO2, NOx and SOx. Given the structure of EU-wide energy sources used for electricity generation, the potential pollutant emissions stemming from these energy sources, related to energy consumption of an electric vehicle, was determined under the projected environmental impact of specific market penetration of electric vehicles. In addition to the overall impact at the EU level, were identified the countries for which the use of electric vehicles is (or not feasible in terms of reaching the lower values ​​of future emissions compared to the present and future European standards.

  20. Four conceptual issues to consider in integrating social and environmental factors in risk and impact assessments

    Energy Technology Data Exchange (ETDEWEB)

    Domínguez-Gómez, J. Andrés, E-mail: andres@uhu.es

    2016-01-15

    In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it parallel progress in addressing the main shortcomings of EIA/SIA, i.e. insufficient integration of environmental and social factors into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their analysis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmental and economic) of projects which impact on the environment, and consequently to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argues that, in a sociological context of complexity and dynamism, four conceptual elements should underpin approaches to socio-environmental risk and impact assessment in development projects: a theoretical base in actor–network theory; an ethical grounding in values which are internationally recognized (though not always fulfilled in practice); a (new) epistemological-scientific base; and a methodological foundation in social participation. - Highlights: • A theoretical foundation in actor–network theory • An ethical grounding in values which are internationally recognized, but rarely carried through into practice • A (new) epistemological-scientific base • A methodological foundation in social participation.