WorldWideScience

Sample records for projections generally exceeding

  1. Prediction in Partial Duration Series With Generalized Pareto-Distributed Exceedances

    DEFF Research Database (Denmark)

    Rosbjerg, Dan; Madsen, Henrik; Rasmussen, Peter Funder

    1992-01-01

    As a generalization of the common assumption of exponential distribution of the exceedances in Partial duration series the generalized Pareto distribution has been adopted. Estimators for the parameters are presented using estimation by both method of moments and probability-weighted moments......-weighted moments. Maintaining the generalized Pareto distribution as the parent exceedance distribution the T-year event is estimated assuming the exceedances to be exponentially distributed. For moderately long-tailed exceedance distributions and small to moderate sample sizes it is found, by comparing mean...... square errors of the T-year event estimators, that the exponential distribution is preferable to the correct generalized Pareto distribution despite the introduced model error and despite a possible rejection of the exponential hypothesis by a test of significance. For moderately short-tailed exceedance...

  2. Prediction in Partial Duration Series With Generalized Pareto-Distributed Exceedances

    DEFF Research Database (Denmark)

    Rosbjerg, Dan; Madsen, Henrik; Rasmussen, Peter Funder

    1992-01-01

    As a generalization of the common assumption of exponential distribution of the exceedances in Partial duration series the generalized Pareto distribution has been adopted. Estimators for the parameters are presented using estimation by both method of moments and probability-weighted moments...... distributions (with physically justified upper limit) the correct exceedance distribution should be applied despite a possible acceptance of the exponential assumption by a test of significance....

  3. Modelling of snow exceedances

    Science.gov (United States)

    Jordanova, Pavlina K.; Sadovský, Zoltán; Stehlík, Milan

    2017-07-01

    Modelling of snow exceedances is of great importance and interest for ecology, civil engineering and general public. We suggest the favorable fit for exceedances related to the exceptional snow loads from Slovakia, assuming that the data is driven by Generalised Pareto Distribution or Generalized Extreme Value Distribution. Further, the statistical dependence between the maximal snow loads and the corresponding altitudes is studied.

  4. General aviation accidents related to exceedance of airplane weight/center of gravity limits.

    Science.gov (United States)

    Boyd, Douglas D

    2016-06-01

    Obesity, affects a third of the US population and its corollary occupant weight adversely impacts safe flight operations. Increased aircraft weight results in longer takeoff/landing distances, degraded climb gradients and airframe failure may occur in turbulence. In this study, the rate, temporal changes, and lethality of accidents in piston-powered, general aviation aircraft related to exceeding the maximum aircraft weight/center of gravity (CG) limits were determined. Nation-wide person body mass were from the National Health and Nutrition Examination Survey. The NTSB database was used to identify accidents related to operation of aircraft outside of their weight/CG envelope. Statistical analyses employed T-tests, proportion tests and a Poisson distribution. While the average body mass climbed steadily (p<0.001) between 1999 and 2014 the rate of accidents related to exceedance of the weight/CG limits did not change (p=0.072). However, 57% were fatal, higher (p<0.001) than the 21% for mishaps attributed to other causes/factors. The majority (77%) of accidents were due to an overloaded aircraft operating within its CG limits. As to the phase of flight, accidents during takeoff and those occurring enroute carried the lowest (50%) and highest (85%) proportion of fatal accidents respectively. While the rate of general aviation accidents related to operating an aircraft outside of its weight/CG envelope has not increased over the past 15 years, these types of accidents carry a high risk of fatality. Airmen should be educated as to such risks and to dispel the notion held by some that flights may be safely conducted with an overloaded aircraft within its CG limits. Copyright © 2016 Elsevier Ltd. All rights reserved.

  5. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  6. Can LENR Energy Gains Exceed 1000?

    Science.gov (United States)

    Nagel, David J.

    2011-03-01

    Energy gain is defined as the energy realized from reactions divided by the energy required to produce those reactions. Low Energy Nuclear Reactions (LENR) have already been measured to significantly exceed the energy gain of 10 projected from ITER,possibly 15 years from now. Electrochemical experiments using the Pd-D system have shown energy gains exceeding 10. Gas phase experiments with the Ni-H system were reported to yield energy gains of over 100. Neither of these reports has been adequately verified or reproduced. However, the question in the title still deserves consideration. If, as thought by many, it is possible to trigger nuclear reactions that yield MeV energies with chemical energies of the order of eV, then the most optimistic expectation is that LENR gains could approach one million. Hence, the very tentative answer to the question above is yes. However, if LENR could be initiated with some energy cost, and then continue to ``burn,'' very high energy gains might be realized. Consider a match and a pile of dry logs. The phenomenon termed ``heat after death'' will be examined to see if it might be the initial evidence for nuclear ``burning.''

  7. The generalized back projection theorem for cone beam reconstruction

    International Nuclear Information System (INIS)

    Peyrin, F.C.

    1985-01-01

    The use of cone beam scanners raises the problem of three dimensional reconstruction from divergent projections. After a survey on bidimensional analytical reconstruction methods we examine their application to the 3D problem. Finally, it is shown that the back projection theorem can be generalized to cone beam projections. This allows to state a new inversion formula suitable for both the 4 π parallel and divergent geometries. It leads to the generalization of the ''rho-filtered back projection'' algorithm which is outlined

  8. ATRF Earns Three Green Globes, Exceeds NIH Building Standards | Poster

    Science.gov (United States)

    By Ashley DeVine, Staff Writer From project management and energy and water efficiency to emissions and the indoor environment, the Advanced Technology Research Facility (ATRF) was built with sustainability in mind, exceeding the National Institutes of Health’s (NIH’s) building standards and earning three Green Globes from the Green Building Initiative (GBI).

  9. Generalized projective synchronization of two coupled complex networks of different sizes

    International Nuclear Information System (INIS)

    Li Ke-Zan; He En; Zeng Zhao-Rong; Chi, K. Tse

    2013-01-01

    We investigate a new generalized projective synchronization between two complex dynamical networks of different sizes. To the best of our knowledge, most of the current studies on projective synchronization have dealt with coupled networks of the same size. By generalized projective synchronization, we mean that the states of the nodes in each network can realize complete synchronization, and the states of a pair of nodes from both networks can achieve projective synchronization. Using the stability theory of the dynamical system, several sufficient conditions for guaranteeing the existence of the generalized projective synchronization under feedback control and adaptive control are obtained. As an example, we use Chua's circuits to demonstrate the effectiveness of our proposed approach

  10. On the projective curvature tensor of generalized Sasakian-space ...

    African Journals Online (AJOL)

    space-forms under some conditions regarding projective curvature tensor. All the results obtained in this paper are in the form of necessary and sufficient conditions. Keywords: Generalized Sasakian-space-forms; projectively flat; ...

  11. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  12. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  13. General risks for tunnelling projects: An overview

    Science.gov (United States)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  14. Development of Thresholds and Exceedance Probabilities for Influent Water Quality to Meet Drinking Water Regulations

    Science.gov (United States)

    Reeves, K. L.; Samson, C.; Summers, R. S.; Balaji, R.

    2017-12-01

    Drinking water treatment utilities (DWTU) are tasked with the challenge of meeting disinfection and disinfection byproduct (DBP) regulations to provide safe, reliable drinking water under changing climate and land surface characteristics. DBPs form in drinking water when disinfectants, commonly chlorine, react with organic matter as measured by total organic carbon (TOC), and physical removal of pathogen microorganisms are achieved by filtration and monitored by turbidity removal. Turbidity and TOC in influent waters to DWTUs are expected to increase due to variable climate and more frequent fires and droughts. Traditional methods for forecasting turbidity and TOC require catchment specific data (i.e. streamflow) and have difficulties predicting them under non-stationary climate. A modelling framework was developed to assist DWTUs with assessing their risk for future compliance with disinfection and DBP regulations under changing climate. A local polynomial method was developed to predict surface water TOC using climate data collected from NOAA, Normalized Difference Vegetation Index (NDVI) data from the IRI Data Library, and historical TOC data from three DWTUs in diverse geographic locations. Characteristics from the DWTUs were used in the EPA Water Treatment Plant model to determine thresholds for influent TOC that resulted in DBP concentrations within compliance. Lastly, extreme value theory was used to predict probabilities of threshold exceedances under the current climate. Results from the utilities were used to produce a generalized TOC threshold approach that only requires water temperature and bromide concentration. The threshold exceedance model will be used to estimate probabilities of exceedances under projected climate scenarios. Initial results show that TOC can be forecasted using widely available data via statistical methods, where temperature, precipitation, Palmer Drought Severity Index, and NDVI with various lags were shown to be important

  15. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  16. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  17. Laser projection using generalized phase contrast

    DEFF Research Database (Denmark)

    Glückstad, Jesper; Palima, Darwin; Rodrigo, Peter John

    2007-01-01

    is introduced. An arbitrary phase shift filter eliminates the need for high-frequency modulation and conjugate phase encoding. This lowers device performance requirements and allows practical implementation with currently available dynamic spatial light modulators. (c) 2007 Optical Society of America.......We demonstrate experimental laser projection of a gray-level photographic image with 74% light efficiency using the generalized phase contrast (GPC) method. In contrast with a previously proposed technique [Alonzo et al., New J. Phys. 9, 132 (2007)], a new approach to image construction via GPC...

  18. Generalized algorithm for X-ray projections generation in cone-beam tomography

    International Nuclear Information System (INIS)

    Qin Zhongyuan; Mu Xuanqin; Wang Ping; Cai Yuanlong; Hou Chuanjian

    2002-01-01

    In order to get rid of random factors in the measurement so as to support proceeding 3D reconstruction, a general approach is presented to obtain the X-ray projections in cone-beam tomography. The phantom is firstly discretized into cubic volume through inverse transformation then a generalized projection procedure is proposed to the digitized result without concerning what the phantom exactly is. In the second step, line integrals are calculated to obtain the projection of each X-ray through accumulation of tri-linear interpolation. Considering projection angles, a rotation matrix is proposed to the X-ray source and the detector plane so projections in arbitrary angles can be got. In this approach the algorithm is easy to be extended and irregular objects can also be processed. The algorithm is implemented in Visual C++ and experiments are done using different models. Satisfactory results are obtained. It makes good preparation for the proceeding reconstruction

  19. A New 4D Hyperchaotic System and Its Generalized Function Projective Synchronization

    Directory of Open Access Journals (Sweden)

    Yuan Gao

    2013-01-01

    Full Text Available A new four-dimensional hyperchaotic system is investigated. Numerical and analytical studies are carried out on its basic dynamical properties, such as equilibrium point, Lyapunov exponents, Poincaré maps, and chaotic dynamical behaviors. We verify the realizability of the new system via an electronic circuit by using Multisim software. Furthermore, a generalized function projective synchronization scheme of two different hyperchaotic systems with uncertain parameters is proposed, which includes some existing projective synchronization schemes, such as generalized projection synchronization and function projective synchronization. Based on the Lyapunov stability theory, a controller with parameters update laws is designed to realize synchronization. Using this controller, we realize the synchronization between Chen hyperchaotic system and the new system to verify the validity and feasibility of our method.

  20. A general exact method for synthesizing parallel-beam projections from cone-beam projections via filtered backprojection

    International Nuclear Information System (INIS)

    Li Liang; Chen Zhiqiang; Xing Yuxiang; Zhang Li; Kang Kejun; Wang Ge

    2006-01-01

    In recent years, image reconstruction methods for cone-beam computed tomography (CT) have been extensively studied. However, few of these studies discussed computing parallel-beam projections from cone-beam projections. In this paper, we focus on the exact synthesis of complete or incomplete parallel-beam projections from cone-beam projections. First, an extended central slice theorem is described to establish a relationship between the Radon space and the Fourier space. Then, data sufficiency conditions are proposed for computing parallel-beam projection data from cone-beam data. Using these results, a general filtered backprojection algorithm is formulated that can exactly synthesize parallel-beam projection data from cone-beam projection data. As an example, we prove that parallel-beam projections can be exactly synthesized in an angular range in the case of circular cone-beam scanning. Interestingly, this angular range is larger than that derived in the Feldkamp reconstruction framework. Numerical experiments are performed in the circular scanning case to verify our method

  1. Generalized Schmidt decomposability and its relation to projective norms in multipartite entanglement

    International Nuclear Information System (INIS)

    Sokoli, Florian; Alber, Gernot

    2014-01-01

    Projective norms are capable of measuring entanglement of multipartite quantum states. However, typically, the explicit computation of these distance-based geometric entanglement monotones is very difficult even for finite dimensional systems. Motivated by the significance of Schmidt decompositions for our quantitative understanding of bipartite quantum entanglement, a generalization of this concept to multipartite scenarios is proposed, in the sense that generalized Schmidt decomposability of a multipartite pure state implies that its projective norm can be calculated in a simple way analogous to the bipartite case. Thus, this concept of generalized Schmidt decomposability of multipartite quantum states is linked in a natural way to projective norms as entanglement monotones. Therefore, it may not only be a convenient tool for calculations, but may also shed new light onto the intricate features of multipartite entanglement in an analogous way as the ‘classical’ Schmidt decomposition does for bipartite quantum systems. (paper)

  2. Bulk material management mode of general contractors in nuclear power project

    International Nuclear Information System (INIS)

    Zhang Jinyong; Zhao Xiaobo

    2011-01-01

    The paper introduces the characteristics of bulk material management mode in construction project, and the advantages and disadvantages of bulk material management mode of general contractors in nuclear power project. In combination with the bulk material management mode of China Nuclear Power Engineering Co., Ltd, some improvement measures have been put forward as well. (authors)

  3. Structures of generalized 3-circular projections for symmetric norms

    Indian Academy of Sciences (India)

    Generalized bi-circular projection has been studied by many authors (see the subse- quent paragraph and references at the end of this paper). In particular, Botelho [4] and. Botelho and Jamison [5–8] extensively investigated the structures of GBPs for different. Banach spaces whose isometry group has concrete description ...

  4. A projection-based approach to general-form Tikhonov regularization

    DEFF Research Database (Denmark)

    Kilmer, Misha E.; Hansen, Per Christian; Espanol, Malena I.

    2007-01-01

    We present a projection-based iterative algorithm for computing general-form Tikhonov regularized solutions to the problem minx| Ax-b |2^2+lambda2| Lx |2^2, where the regularization matrix L is not the identity. Our algorithm is designed for the common case where lambda is not known a priori...

  5. Extreme Temperature Exceedances Change more Rapidly Under Future Warming in Regions of non-Gaussian Short Temperature Distribution Tails

    Science.gov (United States)

    Loikith, P. C.; Neelin, J. D.; Meyerson, J.

    2017-12-01

    Regions of shorter-than-Gaussian warm and cold side temperature distribution tails are shown to occur in spatially coherent patterns in the current climate. Under such conditions, warming may be manifested in more complex ways than if the underlying distribution were close to Gaussian. For example, under a uniform warm shift, the simplest prototype for future warming, a location with a short warm side tail would experience a greater increase in extreme warm exceedances compared to if the distribution were Gaussian. Similarly, for a location with a short cold side tail, a uniform warm shift would result in a rapid decrease in extreme cold exceedances. Both scenarios carry major societal and environmental implications including but not limited to negative impacts on human and ecosystem health, agriculture, and the economy. It is therefore important for climate models to be able to realistically reproduce short tails in simulations of historical climate in order to boost confidence in projections of future temperature extremes. Overall, climate models contributing to the fifth phase of the Coupled Model Intercomparison Project capture many of the principal observed regions of short tails. This suggests the underlying dynamics and physics occur on scales resolved by the models, and helps build confidence in model projections of extremes. Furthermore, most GCMs show more rapid changes in exceedances of extreme temperature thresholds in regions of short tails. Results therefore suggest that the shape of the tails of the underlying temperature distribution is an indicator of how rapidly a location will experience changes to extreme temperature occurrence under future warming.

  6. General projective relativity and the vector-tensor gravitational field

    International Nuclear Information System (INIS)

    Arcidiacono, G.

    1986-01-01

    In the general projective relativity, the induced 4-dimensional metric is symmetric in three cases, and we obtain the vector-tensor, the scalar-tensor, and the scalar-vector-tensor theories of gravitation. In this work we examine the vector-tensor theory, similar to the Veblen's theory, but with a different physical interpretation

  7. Generalized projective synchronization via the state observer and its application in secure communication

    International Nuclear Information System (INIS)

    Wu Di; Li Juan-Juan

    2010-01-01

    Based on the improved state observer and the pole placement technique, by adding a constant which extends the scope of use of the original system, a new design method of generalized projective synchronization is proposed. With this method, by changing the projective synchronization scale factor, one can achieve not only complete synchronization, but also anti-synchronization, as well as arbitrary percentage of projective synchronization, so that the system may attain arbitrary synchronization in a relatively short period of time, which makes this study more meaningful. By numerical simulation, and choosing appropriate scale factor, the results of repeated experiments verify that this method is highly effective and satisfactory. Finally, based on this method and the relevant feedback concept, a novel secure communication project is designed. Numerical simulation verifies that this secure communication project is very valid, and moreover, the experimental result has been greatly improved in decryption time. (general)

  8. General Aviation in Nebraska: Nebraska SATS Project Background Paper No. 1

    Science.gov (United States)

    Smith, Russell; Wachal, Jocelyn

    2000-01-01

    The Nebraska SATS project is a state-level component of NASA's Small Aircraft Transportation System (SATS). During the next several years the project will examine several different factors affecting SATS implementation in Nebraska. These include economic and taxation issues, public policy issues, airport planning processes, information dissemination strategies, and systemic change factors. This background paper profiles the general aviation system in Nebraska. It is written to provide information about the "context" within which SATS will be pursued. The primary focus is thus on describing and providing background information about the current situation. A secondary focus is on drawing general conclusions about the ability of the current system to incorporate the types of changes implied by SATS. First, some brief information on the U.S. aviation system is provided. The next two sections profile the current general aviation aircraft and pilot base. Nebraska's system of general aviation airports is then described. Within this section of the paper, information is provided on the different types of general aviation airports in Nebraska, airport activity levels and current infrastructure. The fourth major section of the background paper looks at Nebraska's local airport authorities. These special purpose local governments oversee the majority of the general aviation airports in the state. Among the items examined are total expenditures, capital expenditures and planning activities. Next, the paper provides background information on the Nebraska Department of Aeronautics (NDA) and recent Federal funding for general aviation in Nebraska. The final section presents summary conclusions.

  9. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  10. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  11. Some Convergence Strategies for the Alternating Generalized Projection Method

    Directory of Open Access Journals (Sweden)

    Maricarmen Andrade

    2013-11-01

    Full Text Available In this paper we extend the application of the alternating projection algorithm to solve the problem of finding a point in the intersection of $n$ sets ($n\\geq2$, which are not all of them convex sets. Here we term such method as alternating generalized projection (AGP method. In particular, we are interested in addressing the problem of avoiding the so-called trap points, which may prevent an algorithm to obtain a feasible solution in two or more sets not all convex. Some strategies that allow us to reach the feasible solution are established and conjectured. Finally, we present simple numerical results that illustrate the efficiency of the iterative methods considered.

  12. The USL NASA PC R and D project: General specifications of objectives

    Science.gov (United States)

    Dominick, Wayne D. (Editor)

    1984-01-01

    Given here are the general specifications of the objectives of the University of Southwestern Louisiana Data Base Management System (USL/DBMS) NASA PC R and D Project, a project initiated to address future R and D issues related to PC-based processing environments acquired pursuant to the NASA contract work; namely, the IBM PC/XT systems.

  13. A recurrent neural network based on projection operator for extended general variational inequalities.

    Science.gov (United States)

    Liu, Qingshan; Cao, Jinde

    2010-06-01

    Based on the projection operator, a recurrent neural network is proposed for solving extended general variational inequalities (EGVIs). Sufficient conditions are provided to ensure the global convergence of the proposed neural network based on Lyapunov methods. Compared with the existing neural networks for variational inequalities, the proposed neural network is a modified version of the general projection neural network existing in the literature and capable of solving the EGVI problems. In addition, simulation results on numerical examples show the effectiveness and performance of the proposed neural network.

  14. GENERAL ALGORITHMIC SCHEMA OF THE PROCESS OF THE CHILL AUXILIARIES PROJECTION

    Directory of Open Access Journals (Sweden)

    A. N. Chichko

    2006-01-01

    Full Text Available The general algorithmic diagram of systematization of the existing approaches to the process of projection is offered and the foundation of computer system of the chill mold arming construction is laid.

  15. Development and Assessment of Service Learning Projects in General Biology

    Science.gov (United States)

    Felzien, Lisa; Salem, Laura

    2008-01-01

    Service learning involves providing service to the community while requiring students to meet learning goals in a specific course. A service learning project was implemented in a general biology course at Rockhurst University to involve students in promoting scientific education in conjunction with community partner educators. Students were…

  16. General criteria for the project of nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    1979-01-01

    Recommendations are presented establishing the general criteria for the project of nuclear fuel reprocessing plants to be licensed according to the legislation in effect. They apply to all the plant's systems, components and structures which are important to operation safety and to the public's health and safety. (F.E.) [pt

  17. National data analysis of general radiography projection method in medical imaging

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Su; Seo, Deok Nam; Choi, In Seok [Dept. of Bio-Convergence Engineering, Korea University Graduate School, Seoul (Korea, Republic of); and others

    2014-09-15

    According to database of medical institutions of health insurance review and assessment service in 2013, 1,118 hospitals and clinics have department of radiology in Korea. And there are CT, fluoroscopic and general radiographic equipment in those hospitals. Above all, general radiographic equipment is the most commonly used in the radiology department. And most of the general radiographic equipment are changing the digital radiography system from the film-screen types of the radiography system nowadays. However, most of the digital radiography department are used the film-screen types of the radiography system. Therefore, in this study, we confirmed present conditions of technical items for general radiography used in hospital and research on general radiographic techniques in domestic medical institutions. We analyzed 26 radiography projection method including chest, skull, spine and pelvis which are generally used in the radiography department.

  18. General methods for modified projective synchronization of hyperchaotic systems with known or unknown parameters

    Science.gov (United States)

    Tang, Yang; Fang, Jian-an

    2008-03-01

    This work is concerned with the general methods for modified projective synchronization of hyperchaotic systems. A systematic method of active control is developed to synchronize two hyperchaotic systems with known parameters. Moreover, by combining the adaptive control and linear feedback methods, general sufficient conditions for the modified projective synchronization of identical or different chaotic systems with fully unknown or partially unknown parameters are presented. Meanwhile, the speed of parameters identification can be regulated by adjusting adaptive gain matrix. Numerical simulations verify the effectiveness of the proposed methods.

  19. R&P: the multiple meaning of a research project in general practice.

    Science.gov (United States)

    Visentin, Giorgio

    2005-08-01

    Rischio e Prevenzione (Risk and Prevention) is a research project that is becoming the paradigm of the Italian research on General Practice. It started from a survey showing that treatment and control of cardiovascular risk is still far from optimal even in very high-risk patients. A group of general practitioners, coordinated by Istituto Mario Negri, wrote the protocol of the study with various proposals: Creating a research network. Building research infrastructure with good research capacity. Building a 'therapeutic alliance' with the patient while presenting the research, not only obtaining their signature for a 'bureaucratic' informed consent. Having the 'Collaborative Group' as the 'sponsor' of a research even if the funds are coming from Pharmaceutical Industry. It is a randomised controlled trial (RCT) carried out in primary care with the normal patient of our daily work, so transferability is very possible. The way to enroll the patients and the request to specify the reason for not joining the project of the outcome study are a kind of participatory research. The outcome study can become a model for implementing new strategy on cardiovascular risk. A specific questionnaire will enquire the different point of view of the patient and of the general practitioner/researcher. The result of this project will help us understand the phenomenon of the poor compliance of the high-risk patients. First results during enrollment allow some optimism.

  20. Control panel and indicators for production control in building projects

    Directory of Open Access Journals (Sweden)

    Orihuela Pablo

    2018-02-01

    Full Text Available In general, every project should have indicators that monitor compliance with established goals. In con­struction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper sub­mitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering (DOI: 10.1016/j.proeng.2017.07.230, presents a proposal of these three types of indicators for the design, supply and assembly phases of housing projects. Thus, all project stakeholders can have a control panel that will monitor if an indicator exceeds the limits, thereby allowing taking corrective actions in a timely and effective manner.

  1. Breaking projective chaos synchronization secure communication using filtering and generalized synchronization

    International Nuclear Information System (INIS)

    Alvarez, G.; Li Shujun; Montoya, F.; Pastor, G.; Romera, M.

    2005-01-01

    This paper describes the security weaknesses of a recently proposed secure communication method based on chaotic masking using projective synchronization of two chaotic systems. We show that the system is insecure and how to break it in two different ways, by high-pass filtering and by generalized synchronization

  2. Generalized dislocated lag function projective synchronization of fractional order chaotic systems with fully uncertain parameters

    International Nuclear Information System (INIS)

    Wang, Cong; Zhang, Hong-li; Fan, Wen-hui

    2017-01-01

    In this paper, we propose a new method to improve the safety of secure communication. This method uses the generalized dislocated lag projective synchronization and function projective synchronization to form a new generalized dislocated lag function projective synchronization. Moreover, this paper takes the examples of fractional order Chen system and Lü system with uncertain parameters as illustration. As the parameters of the two systems are uncertain, the nonlinear controller and parameter update algorithms are designed based on the fractional stability theory and adaptive control method. Moreover, this synchronization form and method of control are applied to secure communication via chaotic masking modulation. Many information signals can be recovered and validated. Finally, simulations are used to show the validity and feasibility of the proposed scheme.

  3. European project for developing general guidelines for harmonising internal dose assessment procedures (IDEAS)

    International Nuclear Information System (INIS)

    Andrasi, A.; Bailey, M.; Puncher, M.; Berkovski, V.; Eric Blanchardon, E.; Jourdain, J.-R.; Carlo-Maria Castellani, C.-M.; Doerfel, H.; Christian Hurtgen, Ch.; Le Guen, B.

    2003-01-01

    Several international intercomparison exercises on intake and internal dose assessments from monitoring data led to the conclusion that the results calculated by different participants varied significantly mainly because of the wide variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need for harmonisation of the procedures has been formulated as an EU research project under the 5 th Framework Programme (2001-2005), with the aim of developing general guidelines for standardising assessments of intakes and internal doses. In the IDEAS project eight institutions from seven European countries are participating using inputs also from internal dosimetry professionals from across Europe to ensure broad consensus in the outcome of the project. The IDEAS project is explained

  4. A Computer-Based Laboratory Project for the Study of Stimulus Generalization and Peak Shift

    Science.gov (United States)

    Derenne, Adam; Loshek, Eevett

    2009-01-01

    This paper describes materials designed for classroom projects on stimulus generalization and peak shift. A computer program (originally written in QuickBASIC) is used for data collection and a Microsoft Excel file with macros organizes the raw data on a spreadsheet and creates generalization gradients. The program is designed for use with human…

  5. General presentation of projects mechanisms

    International Nuclear Information System (INIS)

    2003-01-01

    This guide provides recommendations and tools to implement projects mechanisms, in the framework of the kyoto protocol. It precises the place of the projects mechanisms in the display of tools involved in the climatic change fight policies, at the national as international scale. It recalls the main characteristics and the rules of utilization and illustrates the corresponding interests. (A.L.B.)

  6. Global Dynamical Systems Involving Generalized -Projection Operators and Set-Valued Perturbation in Banach Spaces

    Directory of Open Access Journals (Sweden)

    Yun-zhi Zou

    2012-01-01

    Full Text Available A new class of generalized dynamical systems involving generalized f-projection operators is introduced and studied in Banach spaces. By using the fixed-point theorem due to Nadler, the equilibrium points set of this class of generalized global dynamical systems is proved to be nonempty and closed under some suitable conditions. Moreover, the solutions set of the systems with set-valued perturbation is showed to be continuous with respect to the initial value.

  7. Response Load Extrapolation for Wind Turbines during Operation Based on Average Conditional Exceedance Rates

    DEFF Research Database (Denmark)

    Toft, Henrik Stensgaard; Naess, Arvid; Saha, Nilanjan

    2011-01-01

    to cases where the Gumbel distribution is the appropriate asymptotic extreme value distribution. However, two extra parameters are introduced by which a more general and flexible class of extreme value distributions is obtained with the Gumbel distribution as a subclass. The general method is implemented...... within a hierarchical model where the variables that influence the loading are divided into ergodic variables and time-invariant non-ergodic variables. The presented method for statistical response load extrapolation was compared with the existing methods based on peak extrapolation for the blade out......The paper explores a recently developed method for statistical response load (load effect) extrapolation for application to extreme response of wind turbines during operation. The extrapolation method is based on average conditional exceedance rates and is in the present implementation restricted...

  8. The international project of radiation and hydrochemical investigation and monitoring of general Caspian rivers

    International Nuclear Information System (INIS)

    Passell, H.D.; Barber, D.S.; Kadyrzhanov, K.K; Solodukhin, V.P.; Chernykh, E.E.; Arutyunyan, R.V.; Valyaev, A.N.; Kadik, A.A.; Stepanetts, O.V; Vernadsky, V.I.; Alizade, A.A.; Gutiev, I.S.; Mamedov, R.F.; Nadareishvili, K.S.; Chkhartishvili, A.G.; Tsitskishvili, M.S.; Chubaryan, E. V; Gevorgyan, R.G.; Puskyulyan, K.I.

    2005-01-01

    Full text: The scientific community of six countries (USA, Kazakhstan, Russia, Georgia, Armenia, and Azerbaijan) has developed the ecological project 'Joint International Researches and Creation of the General System of Radiation and Hydro-chemical Monitoring of Rivers of the Caspian Sea Basin.' The purpose of this project is to investigate and characterized contamination by radionuclides and toxic and chemically hazardous elements and create a valid system of radiation and hydro-chemical monitoring of the main river basins of the Caspian region: the Volga, Ural, Emba and Kura. The basins of these rivers cover large parts of Europe and Asia, including parts of Russia, West Kazakhstan and the South Caucasus and including territories of Georgia, Armenia and Azerbaijan. The total area of the basins of these rivers exceeds combined area of such large European states as France, Spain and Germany, and comprises 1631 sq. km. All these rivers are the main life-supporting water arteries for the region's inhabitants, a population that comprises tens of millions of people Also, the outlets of these rivers determine the condition of the aquatic environment of the Caspian Sea. The ecological condition of the aquatic environment of all the rivers of the Caspian Sea is to a great extent due to contamination, the main components of which are anthropogenic radioactive elements, heavy metals and oil products. At present, information about contamination levels of these rivers is not known and is occasionally contradictory. In this connection there is an obvious need of qualified investigation of contamination levels and its character in the basins of these rivers and in creating a common monitoring system to assess the quality of the aquatic environment. The present project is devoted to this matter. 1. The project provides for the following main tasks: 1. Wide-ranging investigation of the level and character of contamination by radionuclides and toxic elements of the river basins

  9. 29 CFR 4.162 - Fringe benefits under contracts exceeding $2,500.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Fringe benefits under contracts exceeding $2,500. 4.162... Compensation Standards § 4.162 Fringe benefits under contracts exceeding $2,500. (a) Pursuant to the statutory... contain a provision specifying the fringe benefits to be furnished the various classes of service...

  10. General practitioners in Styria - who is willing to take part in research projects and why? : A survey by the Institute of General Practice and Health Services Research.

    Science.gov (United States)

    Poggenburg, Stephanie; Reinisch, Manuel; Höfler, Reinhild; Stigler, Florian; Avian, Alexander; Siebenhofer, Andrea

    2017-11-01

    Increasing recognition of general practice is reflected in the growing number of university institutes devoted to the subject and Health Services Research (HSR) is flourishing as a result. In May 2015 the Institute of General Practice and Evidence-based Health Services Research, Medical University of Graz, initiated a survey of Styrian GPs. The aim of the survey was to determine the willingness to take part in HSR projects, to collect sociodemographic data from GPs who were interested and to identify factors affecting participation in research projects. Of the 1015 GPs who received the questionnaire, 142 (14%) responded and 135 (13%) were included in the analysis. Overall 106 (10%) GPs indicated their willingness to take part in research projects. Factors inhibiting participation were lack of time, administrative workload, and lack of assistance. Overall, 10% of Styrian GPs were willing to participate in research projects. Knowledge about the circumstances under which family doctors are prepared to participate in HSR projects will help in the planning of future projects.

  11. Mechanism design of reverse auction on concession period and generalized quality for PPP projects

    Institute of Scientific and Technical Information of China (English)

    Xianjia WANG; Shiwei WU

    2017-01-01

    Reverse auctions of PPP projects usually require the bid to specify several characteristics of quality and the concession period to be fulfilled.This paper sets up a summary function of generalized quality,which contributes to reducing the dimensions of information.Thus,the multidimensional reverse auction model of a PPP project can be replaced by a two-dimensional direct mechanism based on the concession period and the generalized quality.Based on the theory of the revelation principle,the feasibility conditions,equilibrium solution and generalized quality requirements of such a mechanism,considering the influence of a variable investment structure are described.Moreover,two feasible multidimensional reverse auctions for implementing such a direct mechanism:Adjusting the scoring function and establishing a special reverse auction rule are built.The analysis shows that in these types of reverse auctions,optimal allocation can be achieved,the social benefit under the incomplete information will be maximized,and the private sector with the highest integrated management level wins the bid.In such a direct mechanism,the investment and financial pressure of the public sector can be reduced.

  12. A generalization of the Friedrichs angle and the method of alternating projections

    Czech Academy of Sciences Publication Activity Database

    Badea, C.; Grivaux, S.; Müller, Vladimír

    2010-01-01

    Roč. 348, 1-2 (2010), s. 53-56 ISSN 1631-073X R&D Projects: GA ČR(CZ) GA201/06/0128 Institutional research plan: CEZ:AV0Z10190503 Keywords : Hilbert space * Neumann -Halperin method Subject RIV: BA - General Mathematics Impact factor: 0.399, year: 2010 http://www.sciencedirect.com/science/article/pii/S1631073X09004002

  13. Generalized projective synchronization of chaotic nonlinear gyros coupled with dead-zone input

    International Nuclear Information System (INIS)

    Hung, M.-L.; Yan, J.-J.; Liao, T.-L.

    2008-01-01

    This paper addresses the synchronization problem of drive-response chaotic gyros coupled with dead-zone nonlinear input. Using the sliding mode control technique, a novel control law is established which guarantees generalized projective synchronization even when the dead-zone nonlinearity is present. Numerical simulations are presented to verify that the synchronization can be achieved by using the proposed synchronization scheme

  14. Loss of serotonin 2A receptors exceeds loss of serotonergic projections in early Alzheimer's disease

    DEFF Research Database (Denmark)

    Marner, Lisbeth; Frøkjær, Vibe; Kalbitzer, Jan

    2012-01-01

    and the serotonin transporter binding, the latter as a measure of serotonergic projections and neurons. Twelve patients with AD (average Mini Mental State Examination [MMSE]: 24) and 11 healthy age-matched subjects underwent positron emission tomography (PET) scanning with [(18)F]altanserin and [(11)C...

  15. Generalized Projective Synchronization between Two Complex Networks with Time-Varying Coupling Delay

    International Nuclear Information System (INIS)

    Mei, Sun; Chang-Yan, Zeng; Li-Xin, Tian

    2009-01-01

    Generalized projective synchronization (GPS) between two complex networks with time-varying coupling delay is investigated. Based on the Lyapunov stability theory, a nonlinear controller and adaptive updated laws are designed. Feasibility of the proposed scheme is proven in theory. Moreover, two numerical examples are presented, using the energy resource system and Lü's system [Physica A 382 (2007) 672] as the nodes of the networks. GPS between two energy resource complex networks with time-varying coupling delay is achieved. This study can widen the application range of the generalized synchronization methods and will be instructive for the demand–supply of energy resource in some regions of China

  16. Generalized Projective Synchronization between Two Complex Networks with Time-Varying Coupling Delay

    Science.gov (United States)

    Sun, Mei; Zeng, Chang-Yan; Tian, Li-Xin

    2009-01-01

    Generalized projective synchronization (GPS) between two complex networks with time-varying coupling delay is investigated. Based on the Lyapunov stability theory, a nonlinear controller and adaptive updated laws are designed. Feasibility of the proposed scheme is proven in theory. Moreover, two numerical examples are presented, using the energy resource system and Lü's system [Physica A 382 (2007) 672] as the nodes of the networks. GPS between two energy resource complex networks with time-varying coupling delay is achieved. This study can widen the application range of the generalized synchronization methods and will be instructive for the demand-supply of energy resource in some regions of China.

  17. ATLAS: Exceeding all expectations

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    “One year ago it would have been impossible for us to guess that the machine and the experiments could achieve so much so quickly”, says Fabiola Gianotti, ATLAS spokesperson. The whole chain – from collision to data analysis – has worked remarkably well in ATLAS.   The first LHC proton run undoubtedly exceeded expectations for the ATLAS experiment. “ATLAS has worked very well since the beginning. Its overall data-taking efficiency is greater than 90%”, says Fabiola Gianotti. “The quality and maturity of the reconstruction and simulation software turned out to be better than we expected for this initial stage of the experiment. The Grid is a great success, and right from the beginning it has allowed members of the collaboration all over the world to participate in the data analysis in an effective and timely manner, and to deliver physics results very quickly”. In just a few months of data taking, ATLAS has observed t...

  18. On the K(a)hler-Ricci Flow on Projective Manifolds of General Type

    Institute of Scientific and Technical Information of China (English)

    Gang TIAN; Zhou ZHANG

    2006-01-01

    This note concerns the global existence and convergence of the solution for K(a)hler-Ricci flow equation when the canonical class, Kx, is numerically effective and big.We clarify some known results regarding this flow on projective manifolds of general type and also show some new observations and refined results.

  19. Adaptive generalized function projective lag synchronization of different chaotic systems with fully uncertain parameters

    International Nuclear Information System (INIS)

    Wu Xiangjun; Lu Hongtao

    2011-01-01

    Highlights: → Adaptive generalized function projective lag synchronization (AGFPLS) is proposed. → Two uncertain chaos systems are lag synchronized up to a scaling function matrix. → The synchronization speed is sensitively influenced by the control gains. → The AGFPLS scheme is robust against noise perturbation. - Abstract: In this paper, a novel projective synchronization scheme called adaptive generalized function projective lag synchronization (AGFPLS) is proposed. In the AGFPLS method, the states of two different chaotic systems with fully uncertain parameters are asymptotically lag synchronized up to a desired scaling function matrix. By means of the Lyapunov stability theory, an adaptive controller with corresponding parameter update rule is designed for achieving AGFPLS between two diverse chaotic systems and estimating the unknown parameters. This technique is employed to realize AGFPLS between uncertain Lue chaotic system and uncertain Liu chaotic system, and between Chen hyperchaotic system and Lorenz hyperchaotic system with fully uncertain parameters, respectively. Furthermore, AGFPLS between two different uncertain chaotic systems can still be achieved effectively with the existence of noise perturbation. The corresponding numerical simulations are performed to demonstrate the validity and robustness of the presented synchronization method.

  20. 40 CFR 1045.107 - What are the not-to-exceed emission standards?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false What are the not-to-exceed emission... Emission Standards and Related Requirements § 1045.107 What are the not-to-exceed emission standards? Not...) For engines equipped with a catalyst, use NTE multipliers from the following table across the...

  1. Report on feasibility study in fiscal 1999. Energy loss reduction project in Myanmar

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Discussions were given on reduction of greenhouse effect gas emission by improving the efficiency of electric power generation facilities and reducing the power transmission loss in Myanmar to link the project to the clean development mechanism. Shwedaung Power Station, Mann Power Station and the transmission system in Mandalay District were taken up as the object of the discussions. Profitability as a result of improving the thermal power generation facilities was calculated as the financial internal rate of return (FIRR) to discuss the feasibility of the implementation of the project. Since the single-shaft gas turbine currently in use has low efficiency, expansion or new installation of the new compound cycle power generation facilities would be most effective providing excellent thermal efficiency and power generation cost efficiency. The FIRR from improving the Shwedaung thermal power plant was calculated as 12.8%, and the Mann power plant as 9.4%, being regarded sufficiently worth for investment. The measures to reduce the transmission loss include introduction of higher voltage, setting new routes, increasing the conductor sizes, enhancing the power factor, and improving the facilities. The economic internal rate of return (EIRR) and the FIRR were calculated to discuss the project feasibility. In case of assuming the subjected analysis period to be ten years, the EIRR was estimated to be 20.41% (exceeding the social discount rate of 10%) and the FIRR to be 17.56% (exceeding the general loan interest of 15%), indicating the project realizable. (NEDO)

  2. Adaptive generalized matrix projective lag synchronization between two different complex networks with non-identical nodes and different dimensions

    International Nuclear Information System (INIS)

    Dai Hao; Jia Li-Xin; Zhang Yan-Bin

    2012-01-01

    The adaptive generalized matrix projective lag synchronization between two different complex networks with non-identical nodes and different dimensions is investigated in this paper. Based on Lyapunov stability theory and Barbalat's lemma, generalized matrix projective lag synchronization criteria are derived by using the adaptive control method. Furthermore, each network can be undirected or directed, connected or disconnected, and nodes in either network may have identical or different dynamics. The proposed strategy is applicable to almost all kinds of complex networks. In addition, numerical simulation results are presented to illustrate the effectiveness of this method, showing that the synchronization speed is sensitively influenced by the adaptive law strength, the network size, and the network topological structure. (general)

  3. Abelian projection on the torus for general gauge groups

    International Nuclear Information System (INIS)

    Ford, C.; Tok, T.; Wipf, A.

    1999-01-01

    We consider Yang-Mills theories with general gauge groups G and twists of the four-torus. We find consistent boundary conditions for gauge fields in all instanton sectors. An extended abelian projection with respect to the Polyakov loop operator is presented, where A 0 is independent of time and in the Cartan subalgebra. Fundamental domains for the gauge fixed A 0 are constructed for arbitrary gauge groups. In the sectors with non-vanishing instanton number such gauge fixings are necessarily singular. The singularities can be restricted to Dirac strings joining magnetically charged defects. The magnetic charges of these monopoles take their values in the co-root lattice of the gauge group. We relate the magnetic charges of the defects and the windings of suitable Higgs fields about these defects to the instanton number

  4. Implicit Knowledge of General Upper Secondary School in a Bridge-building Project

    DEFF Research Database (Denmark)

    Rasmussen, Annette; Andreasen, Karen Egedal

    2016-01-01

    Bridge-building activities are practiced widely in the education systems of Europe. They are meant to bridge transitions between lower and upper secondary school and form a mandatory part of the youth guidance system in Denmark. By giving pupils the opportunity to experience the different...... educational context of upper secondary school, bridge-building activities are meant to facilitate their decision-making on educational paths, but also to attract more and new groups of pupils. However, the premises of the inherent differences of educational contexts and of pupils’ lacking knowledge of upper...... secondary education can be questioned. In this ethnographic case study of a bridge-building project in a rural area in Denmark, we analyse the implicit knowledge of the general upper secondary school, as it is practiced in a bridge-building project, and how it is experienced by the pupils on the background...

  5. Promoting mobility and reducing length of stay in hospitalized general medicine patients: A quality-improvement project.

    Science.gov (United States)

    Hoyer, Erik H; Friedman, Michael; Lavezza, Annette; Wagner-Kosmakos, Kathleen; Lewis-Cherry, Robin; Skolnik, Judy L; Byers, Sherrie P; Atanelov, Levan; Colantuoni, Elizabeth; Brotman, Daniel J; Needham, Dale M

    2016-05-01

    To determine whether a multidisciplinary mobility promotion quality-improvement (QI) project would increase patient mobility and reduce hospital length of stay (LOS). Implemented using a structured QI model, the project took place between March 1, 2013 and March 1, 2014 on 2 general medicine units in a large academic medical center. There were 3352 patients admitted during the QI project period. The Johns Hopkins Highest Level of Mobility (JH-HLM) scale, an 8-point ordinal scale ranging from bed rest (score = 1) to ambulating ≥250 feet (score = 8), was used to quantify mobility. Changes in JH-HLM scores were compared for the first 4 months of the project (ramp-up phase) versus 4 months after project completion (post-QI phase) using generalized estimating equations. We compared the relative change in median LOS for the project months versus 12 months prior among the QI units, using multivariable linear regression analysis adjusting for 7 demographic and clinically relevant variables. Comparing the ramp-up versus post-QI phases, patients reaching JH-HLM's ambulation status increased from 43% to 70% (P mobility scores between admission and discharge increased from 32% to 45% (P 7 days), were associated with a significantly greater adjusted median reduction in LOS of 1.11 (95% CI: -1.53 to -0.65, P mobility was not associated with an increase in injurious falls compared to 12 months prior on the QI units (P = 0.73). Active prevention of a decline in physical function that commonly occurs during hospitalization may be achieved with a structured QI approach. In an adult medicine population, our QI project was associated with improved mobility, and this may have contributed to a reduction in LOS, particularly for more complex patients with longer expected hospital stay. Journal of Hospital Medicine 2016. © 2016 Society of Hospital Medicine. © 2016 Society of Hospital Medicine.

  6. Mercury in United Kingdom topsoils; concentrations, pools, and Critical Limit exceedances

    Energy Technology Data Exchange (ETDEWEB)

    Tipping, E., E-mail: et@ceh.ac.uk [Centre for Ecology and Hydrology, Lancaster Environment Centre, Library Avenue, Bailrigg, Lancaster LA1 4AP (United Kingdom); Poskitt, J.M.; Lawlor, A.J.; Wadsworth, R.A. [Centre for Ecology and Hydrology, Lancaster Environment Centre, Library Avenue, Bailrigg, Lancaster LA1 4AP (United Kingdom); Norris, D.A.; Hall, J.R. [Centre for Ecology and Hydrology, Bangor, Gwynedd LL57 2UW (United Kingdom)

    2011-12-15

    The median total mercury concentration in 898 UK rural topsoils, sampled between 1998 and 2008, was 0.095 {mu}g g{sup -1}. Approximate adjustment for unreactive metal produced an estimate of 0.052 {mu}g g{sup -1} for reactive Hg. The highest concentrations were in the north and west, where organic-rich soils with low bulk densities dominate, but the spatial pattern was quite different if soil Hg pools (mg m{sup -2}) were considered, the highest values being near to the industrial north of England and London. Possible toxic effects of Hg were best evaluated by comparison with soil Critical Limits expressed as ratios of Hg to soil organic matter, or soil solution Hg{sup 2+} concentrations, estimated by chemical speciation modelling. Only a few percent of the rural UK soils showed exceedance, and this also applied to rural soils from the whole of Europe. UK urban and industrial soils had higher Hg concentrations and more cases of exceedance. - Highlights: > Concentrations of Hg in rural soils are highest near to industrial areas and London. > Mercury is strongly associated with soil organic matter. > Only a few percent of UK rural soils have Hg levels higher than Critical Limits. > Critical Limit exceedances are found for 15-30% of urban and industrial soils. - Mercury contents of 898 UK and 868 European rural soils are largely lower than Critical Limit values, but appreciable numbers of soils in UK urban and industrial areas show exceedance.

  7. Quality improvement training for core medical and general practice trainees: a pilot study of project participation, completion and journal publication.

    Science.gov (United States)

    McNab, Duncan; McKay, John; Bowie, Paul

    2015-11-01

    Small-scale quality improvement projects are expected to make a significant contribution towards improving the quality of healthcare. Enabling doctors-in-training to design and lead quality improvement projects is important preparation for independent practice. Participation is mandatory in speciality training curricula. However, provision of training and ongoing support in quality improvement methods and practice is variable. We aimed to design and deliver a quality improvement training package to core medical and general practice specialty trainees and evaluate impact in terms of project participation, completion and publication in a healthcare journal. A quality improvement training package was developed and delivered to core medical trainees and general practice specialty trainees in the west of Scotland encompassing a 1-day workshop and mentoring during completion of a quality improvement project over 3 months. A mixed methods evaluation was undertaken and data collected via questionnaire surveys, knowledge assessment, and formative assessment of project proposals, completed quality improvement projects and publication success. Twenty-three participants attended the training day with 20 submitting a project proposal (87%). Ten completed quality improvement projects (43%), eight were judged as satisfactory (35%), and four were submitted and accepted for journal publication (17%). Knowledge and confidence in aspects of quality improvement improved during the pilot, while early feedback on project proposals was valued (85.7%). This small study reports modest success in training core medical trainees and general practice specialty trainees in quality improvement. Many gained knowledge of, confidence in and experience of quality improvement, while journal publication was shown to be possible. The development of educational resources to aid quality improvement project completion and mentoring support is necessary if expectations for quality improvement are to be

  8. General guidelines for the Assessment of Internal Dose from Monitoring Data (Project IDEAS)

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Blanchardon, E.; Berkovski, V.; Castellani, C. M.; Hurtgen, C.; Jourdain, J. R.; LeGuen, B.; Puncher, M.

    2004-01-01

    In recent major international intercomparison exercises on intake and internal dose assessments from monitoring data the results calculated by different participants varied significantly. This was mainly due to the broad variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need for harmonisation of the procedures has been formulated within an EU research project under the 5th Framework Programme. The aim of the project, IDEAS, is to develop general guidelines for standardising assessments of intakes and internal doses. The IDEAS project started in October 2001 and will end in March 2005. Eight institutions from seven European countries are participating. Inputs from internal dosimetry professionals from across Europe are also being used to ensure a broad consensus in the outcome of the project. The IDEAS project is closely related to some goals of the work of Committee 2 of the ICRP and since 2003 there has been close cooperation between the two groups. To ensure that the guidelines are applicable to a wide range of practical situations, the first step has been to compile a database of well-documented cases of internal contamination. In parallel, an improved version of an existing software package has been developed and distributed to the partners for further use. A large number of cases from the database have been evaluated independently by partners in the project using the same software and the results have been reviewed. Based on these evaluations guidelines are being drafted and will be discussed with dosimetry professionals from around the world by means of a virtual workshop on the Internet early in 2004. The guidelines will be revised and refined on the basis of the experiences and discussions of this virtual workshop and the outcome of an intercomparison exercise organised as part of the project. This will be open to all internal dosimetry professionals. (Author) 10 refs

  9. Separable projection integrals for higher-order correlators of the cosmic microwave sky: Acceleration by factors exceeding 100

    Energy Technology Data Exchange (ETDEWEB)

    Briggs, J.P., E-mail: jb914@cam.ac.uk [Department of Applied Mathematics and Theoretical Physics, University of Cambridge (United Kingdom); Pennycook, S.J. [Intel Corporation (United Kingdom); Fergusson, J.R.; Jäykkä, J.; Shellard, E.P.S. [Department of Applied Mathematics and Theoretical Physics, University of Cambridge (United Kingdom)

    2016-04-01

    We present a case study describing efforts to optimise and modernise “Modal”, the simulation and analysis pipeline used by the Planck satellite experiment for constraining general non-Gaussian models of the early universe via the bispectrum (or three-point correlator) of the cosmic microwave background radiation. We focus on one particular element of the code: the projection of bispectra from the end of inflation to the spherical shell at decoupling, which defines the CMB we observe today. This code involves a three-dimensional inner product between two functions, one of which requires an integral, on a non-rectangular domain containing a sparse grid. We show that by employing separable methods this calculation can be reduced to a one-dimensional summation plus two integrations, reducing the overall dimensionality from four to three. The introduction of separable functions also solves the issue of the non-rectangular sparse grid. This separable method can become unstable in certain scenarios and so the slower non-separable integral must be calculated instead. We present a discussion of the optimisation of both approaches. We demonstrate significant speed-ups of ≈100×, arising from a combination of algorithmic improvements and architecture-aware optimisations targeted at improving thread and vectorisation behaviour. The resulting MPI/OpenMP hybrid code is capable of executing on clusters containing processors and/or coprocessors, with strong-scaling efficiency of 98.6% on up to 16 nodes. We find that a single coprocessor outperforms two processor sockets by a factor of 1.3× and that running the same code across a combination of both microarchitectures improves performance-per-node by a factor of 3.38×. By making bispectrum calculations competitive with those for the power spectrum (or two-point correlator) we are now able to consider joint analysis for cosmological science exploitation of new data.

  10. General aspects of the project organization - the suppliers' view

    International Nuclear Information System (INIS)

    Bogen, J.

    1975-01-01

    One of the major aims in the economic management of a nuclear power project is the completion of the project on scheduled time, at preditermined cost and technical performance in accordance with pre-established goals. The achievement of these goals depends, to the major extent, on the adequacy and accuracy of the project plan. The highest possibilities to save money, minimize delivery time, secure good performance are given during the periode of project planning. During project implementation the project management only should direct his activities for the realization of the pre-elaborated project plan. (orig./FW) [de

  11. Project of the Year Submittal SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    BAUER, R.E.

    2001-01-01

    CH2M HILL Hanford Group is pleased to nominate the SY-101 Surface Level Rise Remediation Project (SLRRP) for the Project Management Institute's consideration as International Project of the Year for 2001. We selected this project as being our best recent example of effective project management, having achieved and exceeded our client's expectations in resolving urgent safety issues related to the storage of high level nuclear waste. In reflection, we consider the SY-101 SLRRP to be a prime example of safe and effective project delivery. The pages that follow present the tools and techniques employed to manage this complex and technically challenging project. Our objective in submitting this nomination is twofold--to share the lessons we have learned with other organizations, and to honor the men and women who contributed to this endeavor. It was by their diligent effort that the successes we relate here were accomplished 10 months ahead of schedule and one million dollars below the authorized budget

  12. How "ought" exceeds but implies "can": Description and encouragement in moral judgment.

    Science.gov (United States)

    Turri, John

    2017-11-01

    This paper tests a theory about the relationship between two important topics in moral philosophy and psychology. One topic is the function of normative language, specifically claims that one "ought" to do something. Do these claims function to describe moral responsibilities, encourage specific behavior, or both? The other topic is the relationship between saying that one "ought" to do something and one's ability to do it. In what respect, if any, does what one "ought" to do exceed what one "can" do? The theory tested here has two parts: (1) "ought" claims function to both describe responsibilities and encourage people to fulfill them (the dual-function hypothesis); (2) the two functions relate differently to ability, because the encouragement function is limited by the person's ability, but the descriptive function is not (the interaction hypothesis). If this theory is correct, then in one respect "ought implies can" is false because people have responsibilities that exceed their abilities. But in another respect "ought implies can" is legitimate because it is not worthwhile to encourage people to do things that exceed their ability. Results from two behavioral experiments support the theory that "ought" exceeds but implies "can." Results from a third experiment provide further evidence regarding an "ought" claim's primary function and how contextual features can affect the interpretation of its functions. Copyright © 2017 Elsevier B.V. All rights reserved.

  13. 34 CFR 350.10 - What are the general requirements for Disability and Rehabilitation Research Projects?

    Science.gov (United States)

    2010-07-01

    ... more of the following types of activities, as specified in §§ 350.13-350.19: (1) Research. (2... 34 Education 2 2010-07-01 2010-07-01 false What are the general requirements for Disability and Rehabilitation Research Projects? 350.10 Section 350.10 Education Regulations of the Offices of the Department of...

  14. Planktivory in the changing Lake Huron zooplankton community: Bythotrephes consumption exceeds that of Mysis and fish

    Science.gov (United States)

    Bunnell, D.B.; Hunter, R. Douglas; Warner, D.M.; Chriscinske, M.A.; Roseman, E.F.

    2011-01-01

    Oligotrophic lakes are generally dominated by calanoid copepods because of their competitive advantage over cladocerans at low prey densities. Planktivory also can alter zooplankton community structure. We sought to understand the role of planktivory in driving recent changes to the zooplankton community of Lake Huron, a large oligotrophic lake on the border of Canada and the United States. We tested the hypothesis that excessive predation by fish (rainbow smelt Osmerus mordax, bloater Coregonus hoyi) and invertebrates (Mysis relicta, Bythotrephes longimanus) had driven observed declines in cladoceran and cyclopoid copepod biomass between 2002 and 2007. We used a field sampling and bioenergetics modelling approach to generate estimates of daily consumption by planktivores at two 91-m depth sites in northern Lake Huron, U.S.A., for each month, May-October 2007. Daily consumption was compared to daily zooplankton production. Bythotrephes was the dominant planktivore and estimated to have eaten 78% of all zooplankton consumed. Bythotrephes consumption exceeded total zooplankton production between July and October. Mysis consumed 19% of all the zooplankton consumed and exceeded zooplankton production in October. Consumption by fish was relatively unimportant - eating only 3% of all zooplankton consumed. Because Bythotrephes was so important, we explored other consumption estimation methods that predict lower Bythotrephes consumption. Under this scenario, Mysis was the most important planktivore, and Bythotrephes consumption exceeded zooplankton production only in August. Our results provide no support for the hypothesis that excessive fish consumption directly contributed to the decline of cladocerans and cyclopoid copepods in Lake Huron. Rather, they highlight the importance of invertebrate planktivores in structuring zooplankton communities, especially for those foods webs that have both Bythotrephes and Mysis. Together, these species occupy the epi-, meta- and

  15. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a projectexceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  16. Dynamic analysis of a new chaotic system with fractional order and its generalized projective synchronization

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Wang Xing-Yuan; Nian Fu-Zhong; Wang Ming-Jun

    2010-01-01

    Based on the stability theory of the fractional order system, the dynamic behaviours of a new fractional order system are investigated theoretically. The lowest order we found to have chaos in the new three-dimensional system is 2.46, and the period routes to chaos in the new fractional order system are also found. The effectiveness of our analysis results is further verified by numerical simulations and positive largest Lyapunov exponent. Furthermore, a nonlinear feedback controller is designed to achieve the generalized projective synchronization of the fractional order chaotic system, and its validity is proved by Laplace transformation theory. (general)

  17. Generalized Projective Synchronization between Two Different Neural Networks with Mixed Time Delays

    Directory of Open Access Journals (Sweden)

    Xuefei Wu

    2012-01-01

    Full Text Available The generalized projective synchronization (GPS between two different neural networks with nonlinear coupling and mixed time delays is considered. Several kinds of nonlinear feedback controllers are designed to achieve GPS between two different such neural networks. Some results for GPS of these neural networks are proved theoretically by using the Lyapunov stability theory and the LaSalle invariance principle. Moreover, by comparison, we determine an optimal nonlinear controller from several ones and provide an adaptive update law for it. Computer simulations are provided to show the effectiveness and feasibility of the proposed methods.

  18. Conditions, factors and criteria for successful project implementation: generalization of experience of project management

    Directory of Open Access Journals (Sweden)

    Feraru Galina Sergeevna

    2014-11-01

    Full Text Available The article addresses issues characterizing features of project management contributing to their competitive advantage; shows the factors and criteria of success of projects and the main reasons for their failures, making the failed efforts of developers to create projects.

  19. Clinical and psychosocial predictors of exceeding target length of stay during inpatient stroke rehabilitation.

    Science.gov (United States)

    Lai, Wesley; Buttineau, Mackenzie; Harvey, Jennifer K; Pucci, Rebecca A; Wong, Anna P M; Dell'Erario, Linda; Bosnyak, Stephanie; Reid, Shannon; Salbach, Nancy M

    2017-10-01

    In Ontario, Canada, patients admitted to inpatient rehabilitation hospitals post-stroke are classified into rehabilitation patient groups based on age and functional level. Clinical practice guidelines, called quality-based procedures, recommend a target length of stay (LOS) for each group. The study objective was to evaluate the extent to which patients post-stroke at an inpatient rehabilitation hospital are meeting LOS targets and to identify patient characteristics that predict exceeding target LOS. A quantitative, longitudinal study from an inpatient rehabilitation hospital was conducted. Participants included adult patients (≥18 years) with stroke, admitted to an inpatient rehabilitation hospital between 2014 and 2015. The percentage of patients exceeding the recommended target LOS was determined. Logistic regression was performed to identify clinical and psychosocial patient characteristics associated with exceeding target LOS after adjusting for stroke severity. Of 165 patients, 38.8% exceeded their target LOS. Presence of ataxia, recurrent stroke, living alone, absence of a caregiver at admission, and acquiring a caregiver during hospital LOS was each associated with significantly higher odds of exceeding target LOS in comparison to patients without these characteristics after adjusting for stroke severity (p stroke-specific factors may be helpful to adjust LOS expectations and promote efficient resource allocation. This exploratory study was limited to findings from one inpatient rehabilitation hospital. Cross-validation of results using data-sets from multiple rehabilitation hospitals across Ontario is recommended.

  20. Estimating the exceedance probability of rain rate by logistic regression

    Science.gov (United States)

    Chiu, Long S.; Kedem, Benjamin

    1990-01-01

    Recent studies have shown that the fraction of an area with rain intensity above a fixed threshold is highly correlated with the area-averaged rain rate. To estimate the fractional rainy area, a logistic regression model, which estimates the conditional probability that rain rate over an area exceeds a fixed threshold given the values of related covariates, is developed. The problem of dependency in the data in the estimation procedure is bypassed by the method of partial likelihood. Analyses of simulated scanning multichannel microwave radiometer and observed electrically scanning microwave radiometer data during the Global Atlantic Tropical Experiment period show that the use of logistic regression in pixel classification is superior to multiple regression in predicting whether rain rate at each pixel exceeds a given threshold, even in the presence of noisy data. The potential of the logistic regression technique in satellite rain rate estimation is discussed.

  1. General guidelines for the assessment of internal dose from monitoring data: Progress of the IDEAS project

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Blanchardon, E.; Cruz-Suarez, R.; Berkovski, V.; Castellani, C. M.; Hurtgenv, C.; Leguen, B.; Malatova, I.; Marsh, J.; Stather, J.; Zeger, J.

    2007-01-01

    In recent major international intercomparison exercises on intake and internal dose assessments from monitoring data, the results calculated by different participants varied significantly. Based on this experience the need for harmonisation of the procedures has been formulated within an EU 5. Framework Programme research project. The aim of the project, IDEAS, is to develop general guidelines for standardising assessments of intakes and internal doses. The IDEAS project started in October 2001 and ended in June 2005. The project is closely related to some goals of the work of Committee 2 of the ICRP and since 2003 there has been close cooperation between the two groups. To ensure that the guidelines are applicable to a wide range of practical situations, the first step was to compile a database of well-documented cases of internal contamination. In parallel, an improved version of an existing software package was developed and distributed to the partners for further use. A large number of cases from the database was evaluated independently by the partners and the results reviewed. Based on these evaluations, guidelines were drafted and discussed with dosimetry professionals from around the world by means of a virtual workshop on the Internet early in 2004. The guidelines have been revised and refined on the basis of the experiences and discussions in this virtual workshop. The general philosophy of the Guidelines is presented here, focusing on the principles of harmonisation, optimisation and proportionality. Finally, the proposed Levels of Task to structure the approach of internal dose evaluation are reported. (authors)

  2. General-purpose heat source project and space nuclear safety and fuels program. Progress report

    International Nuclear Information System (INIS)

    Maraman, W.J.

    1979-12-01

    This formal monthly report covers the studies related to the use of 238 PuO 2 in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of the Los Alamos Scientific Laboratory. The two programs involved are general-purpose heat source development and space nuclear safety and fuels. Most of the studies discussed hear are of a continuing nature. Results and conclusions described may change as the work continues

  3. General aspects of project organization

    International Nuclear Information System (INIS)

    Staebler, K.

    1975-01-01

    For power plant construction and errection the Federal Republic of Germany has a very well experienced industry with remarkable results in the past time. The 'bottle-neck' is not so much the design and manufacturing, it is also not in the area of sub-suppliers but it is more the personal for mounting and commissioning of the plant. In the report are only touched the various problems of project organization by the point of view of the utility. (orig./FW) [de

  4. Hybrid dislocated control and general hybrid projective dislocated synchronization for the modified Lue chaotic system

    International Nuclear Information System (INIS)

    Xu Yuhua; Zhou Wuneng; Fang Jianan

    2009-01-01

    This paper introduces a modified Lue chaotic system, and some basic dynamical properties are studied. Based on these properties, we present hybrid dislocated control method for stabilizing chaos to unstable equilibrium and limit cycle. In addition, based on the Lyapunov stability theorem, general hybrid projective dislocated synchronization (GHPDS) is proposed, which includes complete dislocated synchronization, dislocated anti-synchronization and projective dislocated synchronization as its special item. The drive and response systems discussed in this paper can be strictly different dynamical systems (including different dimensional systems). As examples, the modified Lue chaotic system, Chen chaotic system and hyperchaotic Chen system are discussed. Numerical simulations are given to show the effectiveness of these methods.

  5. Hybrid dislocated control and general hybrid projective dislocated synchronization for the modified Lue chaotic system

    Energy Technology Data Exchange (ETDEWEB)

    Xu Yuhua [College of Information Science and Technology, Donghua University, Shanghai 201620 (China) and Department of Maths, Yunyang Teacher' s College, Hubei 442000 (China)], E-mail: yuhuaxu2004@163.com; Zhou Wuneng [College of Information Science and Technology, Donghua University, Shanghai 201620 (China)], E-mail: wnzhou@163.com; Fang Jianan [College of Information Science and Technology, Donghua University, Shanghai 201620 (China)

    2009-11-15

    This paper introduces a modified Lue chaotic system, and some basic dynamical properties are studied. Based on these properties, we present hybrid dislocated control method for stabilizing chaos to unstable equilibrium and limit cycle. In addition, based on the Lyapunov stability theorem, general hybrid projective dislocated synchronization (GHPDS) is proposed, which includes complete dislocated synchronization, dislocated anti-synchronization and projective dislocated synchronization as its special item. The drive and response systems discussed in this paper can be strictly different dynamical systems (including different dimensional systems). As examples, the modified Lue chaotic system, Chen chaotic system and hyperchaotic Chen system are discussed. Numerical simulations are given to show the effectiveness of these methods.

  6. General chemistry: expanding the learning outcomes and promoting interdisciplinary connections through the use of a semester-long project.

    Science.gov (United States)

    Wenzel, Thomas J

    2006-01-01

    The laboratory component of a first-semester general chemistry course for science majors is described. The laboratory involves a semester-long project undertaken in a small-group format. Students are asked to examine whether plants grown in soil contaminated with lead take up more lead than those grown in uncontaminated soil. They are also asked to examine whether the acidity of the rainwater affects the amount of lead taken up by the plants. Groups are then given considerable independence in the design and implementation of the experiment. Once the seeds are planted, which takes about 4 wk into the term, several shorter experiments are integrated in before it is time to harvest and analyze the plants. The use of a project and small working groups allows for the development of a broader range of learning outcomes than occurs in a "traditional" general chemistry laboratory. The nature of these outcomes and some of the student responses to the laboratory experience are described. This particular project also works well at demonstrating the connections among chemistry, biology, geology, and environmental studies.

  7. Proceedings of the workshops on 'JAEA project researches at J-PARC/MLF'

    International Nuclear Information System (INIS)

    Kajimoto, Ryoichi; Maekawa, Fujio; Arima, Hiroshi; Yoshinari, Shizuka; Arai, Masatoshi

    2011-06-01

    The operation for public use of Materials and Life Science Experimental Facility (MLF) at Japan Proton Accelerator Research Complex (J-PARC) has started since the end of 2008. Rather stable neutron and muon beams at 120 kW are being supplied throughout 2010. Some of the instruments have already produced several good scientific outputs. Furthermore, operation at 200 kW, which exceeds the beam power of the ISIS facility in UK, has started since December 2010. In this promising situation for MLF, we hold three workshops for five neutron instruments which conducted researches for projects by Japan Atomic Energy Agency (JAEA) (project researches): 'Workshop on BL19 (Sep. 29)', 'Workshop on BL04+BL10 (Oct. 28)', and 'Workshop on BL01+BL14 (Oct. 29)'. There, status of the instruments and recent results of the project researches as well as a part of researches by general users were reported, and future directions and issues to be solved of the researches were discussed. This report includes abstracts, materials of the presentations and summary of discussions in the workshops. (author)

  8. Adaptive generalized function matrix projective lag synchronization between fractional-order and integer-order complex networks with delayed coupling and different dimensions

    International Nuclear Information System (INIS)

    Dai, Hao; Si, Gangquan; Jia, Lixin; Zhang, Yanbin

    2013-01-01

    This paper investigates generalized function matrix projective lag synchronization between fractional-order and integer-order complex networks with delayed coupling, non-identical topological structures and different dimensions. Based on Lyapunov stability theory, generalized function matrix projective lag synchronization criteria are derived by using the adaptive control method. In addition, the three-dimensional fractional-order chaotic system and the four-dimensional integer-order hyperchaotic system as the nodes of the drive and the response networks, respectively, are analyzed in detail, and numerical simulation results are presented to illustrate the effectiveness of the theoretical results. (paper)

  9. Protective containment behaviour under exceeded design loads

    International Nuclear Information System (INIS)

    Holub, I.; Stepan, J.; Maly, J.; Schererova, K.

    2003-01-01

    The contribution describes the calculation results of the behaviour of containment structure if loaded in excess of its design load. The Temelin NPP comprises two WWER 1000 blocks and containment consists of a pre-stressed reinforced concrete structure with a system of unbonded cables. The objective of the calculations was to determine the level of load caused by the internal pressure and temperature at which the containment protective function would fail. In the first step, the maximum overpressure was determined, which may be transferred by the containment structure. In further steps analyses were made of various combinations of simultaneous pressure and temperature loads. The contribution presents relevant calculation results, including the evaluation of containment structure behaviour including liner under loads that exceed its design parameters. (author)

  10. The German Chernobyl project: Lessons learned

    International Nuclear Information System (INIS)

    Hill, P.; Hille, R.

    1999-01-01

    This report presents results and lessons learned by one of the so far largest assessments of a post-accidental situation. Funded by the Federal Republic of Germany the German Chernobyl Project investigated in the years 1991-1993 the radiological situation in contaminated regions of the Russian Federation, Belarus and Ukraine. Measurements included a mass screening of the population in order to determine the Cesium body burdens of 250,000+ individuals in more than 240 settlements as well as the evaluation of external doses in selected settlements with soil contaminations varying from less than 74 kBq/m 2 to about 3700 kBq/m 2 including some, where decontamination measures had previously been taken. Also in many settlements environmental monitoring was undertaken. For most individuals doses did not exceed the international annual limits set for the general population. Open and comprehensive communication of results was favourably accepted by the public. In a few settlements the radiological situation has been followed up till to date. (author)

  11. 16 CFR 1611.3 - Flammability-general requirement.

    Science.gov (United States)

    2010-01-01

    ... STANDARD FOR THE FLAMMABILITY OF VINYL PLASTIC FILM The Standard § 1611.3 Flammability—general requirement. The rate of burning shall not exceed 1.2 in./sec as judged by the average of five determinations...

  12. Epidemiology and genetics of common mental disorders in the general population: the PEGASUS-Murcia project

    Science.gov (United States)

    Navarro-Mateu, Fernando; Tormo, MJ; Vilagut, G; Alonso, J; Ruíz-Merino, G; Escámez, T; Salmerón, D; Júdez, J; Martínez, S; Navarro, C

    2013-01-01

    Background Multidisciplinary collaboration between clinicians, epidemiologists, neurogeneticists and statisticians on research projects has been encouraged to improve our knowledge of the complex mechanisms underlying the aetiology and burden of mental disorders. The PEGASUS-Murcia (Psychiatric Enquiry to General Population in Southeast Spain-Murcia) project was designed to assess the prevalence of common mental disorders and to identify the risk and protective factors, and it also included the collection of biological samples to study the gene–environmental interactions in the context of the World Mental Health Survey Initiative. Methods and analysis The PEGASUS-Murcia project is a new cross-sectional face-to-face interview survey based on a representative sample of non-institutionalised adults in the Region of Murcia (Mediterranean Southeast, Spain). Trained lay interviewers used the latest version of the computer-assisted personal interview of the Composite International Diagnostic Interview (CIDI 3.0) for use in Spain, specifically adapted for the project. Two biological samples of buccal mucosal epithelium will be collected from each interviewed participant, one for DNA extraction for genomic and epigenomic analyses and the other to obtain mRNA for gene expression quantification. Several quality control procedures will be implemented to assure the highest reliability and validity of the data. This article describes the rationale, sampling methods and questionnaire content as well as the laboratory methodology. Ethics and dissemination Informed consent will be obtained from all participants and a Regional Ethics Research Committee has approved the protocol. Results will be disseminated in peer-reviewed publications and presented at the national and the international conferences. Discussion Cross-sectional studies, which combine detailed personal information with biological data, offer new and exciting opportunities to study the gene

  13. European research project 'Metrology for radioactive waste management'

    International Nuclear Information System (INIS)

    Suran, J.

    2014-01-01

    The three-year European research project M etrology for Radioactive Waste Management' was launched in October 2011 under the EMRP (European Metrology Research Programme). It involves 13 European national metrology institutes and a total budget exceeds four million Euros. The project is coordinated by the Czech Metrology Institute and is divided into five working groups. This poster presents impact, excellence, relevance to EMPR objectives, and implementation and management of this project.(author)

  14. A Study on OBE Exceedance Criteria Using the CAV Concept for NPPs in Korea

    International Nuclear Information System (INIS)

    Park, Se Moon; Cho, Sung Il; Yun, Kwan Hee

    2009-01-01

    NPPs in Korea have so far complied with the US Regulatory Guide 1.12 Rev.1 (1974) for the seismic monitoring systems. However, researchers in Korea have been considering attempting to comply with Regulatory Guide 1.12 rev.2 (1997) when implementing all future seismic monitoring systems. To comply with the new regulations, Operating Basis Earthquake (OBE) Exceedance Criteria applied with the Cumulative Absolute Velocity (CAV) has to be developed for local use. The CAV was developed in the USA as one reasonable OBE exceedance criterion for NPPs; however, it has not been widely used outside the USA, not-withstanding its solid technical basis. It is, however, expected that the worldwide NPP construction boom will necessitate development and more frequent use of reasonable OBE exceedance criteria. As multi-units (four or more) are situated in one site in Korea, prevention of simultaneous shutdown of multi-unit caused by non damaging earthquakes is very important; otherwise, a serious economic loss could occur, and there could also be a great impact on the stability of the power grid that would arise due to the unnecessary shutdown. Actually, we have had the experience of observing a Peak Ground Acceleration (PGA)-value greater than 0.1g (the current OBE level for Korean NPPs) due to an M=4.8 earthquake (20 th Jan. '07) that did not even cause any damage to the poorly-designed structures nearby. This experience gave a motivation to the KHNP should concern the needs of study on OBE exceedance criteria in view of application of the CAV to Korean seismic situation, which will be more practical. The present paper is intended to show the intermediate result of the research on Operating Basis Earthquake (OBE) exceedance criteria in Korea

  15. Projective relativity, cosmology and gravitation

    International Nuclear Information System (INIS)

    Arcidiacono, G.

    1986-01-01

    This book describes the latest applications of projective geometry to cosmology and gravitation. The contents of the book are; the Poincare group and Special Relativity, the thermodynamics and electromagnetism, general relativity, gravitation and cosmology, group theory and models of universe, the special projective relativity, the Fantappie group and Big-Bang cosmology, a new cosmological projective mechanics, the plasma physics and cosmology, the projective magnetohydrodynamics field, projective relativity and waves propagation, the generalizations of the gravitational field, the general projective relativity, the projective gravitational field, the De Sitter Universe and quantum physics, the conformal relativity and Newton gravitation

  16. 41 CFR 102-85.105 - How does an agency pay for customer alterations that exceed the TI allowance?

    Science.gov (United States)

    2010-07-01

    ... for customer alterations that exceed the TI allowance? 102-85.105 Section 102-85.105 Public Contracts....105 How does an agency pay for customer alterations that exceed the TI allowance? Amounts exceeding the TI allowance are paid in a one-time lump sum and are not amortized over the term of the occupancy...

  17. An experimental study on developing seismic damage indicator appearing OBE exceedance

    International Nuclear Information System (INIS)

    Park, D. S.; Kwon, K. J.; Lee, J. L.

    2000-01-01

    Immediate measurement should be taken depending on the level of seismic damage to nuclear power plants when an earthquake exceeds Operating Base Earthquake by NRC regulatory guide. An earthquake at nuclear plant site is felt with seismic instrument and analyzed by seismic monitoring systems. However, if operators of insufficient knowledge to earthquake can recognize the intensity of the earthquake with a subsidiary indicating model, more immediate response can be conducted. This subsidiary indicating model is called seismic damage indicator. In this regard, an experimental study using shaking table was conducted to develop the seismic damage indicator by CAV and OBE compatible with NRC standard response spectrum. In this test result, stacked acrylic cylinders were manufactured to behave consistently for each direction of seismic load. If the developed SDI is installed in nuclear power plants, it is seemed to be useful in easily determining OBE exceedance easily, and counteracting by plant operator along with the existing seismic monitoring systems

  18. The Unseen Face of E-Business Project Development

    OpenAIRE

    Mesnita, Gabriela; Vasilica, Tiberiu

    2003-01-01

    The purpose of this paper is intent on identify and analyze the unseen factors of successful or failure of e-business project development. The IT managers must take into account both all costs involved in e-business development and all phases (analysis, design, testing, implementation, maintenance and operation) according to principle of project management for software/systems life cycle development. There are many solutions to exceed these factors of failure among could be counted outsourcin...

  19. Large deviation estimates for exceedance times of perpetuity sequences and their dual processes

    DEFF Research Database (Denmark)

    Buraczewski, Dariusz; Collamore, Jeffrey F.; Damek, Ewa

    2016-01-01

    In a variety of problems in pure and applied probability, it is of relevant to study the large exceedance probabilities of the perpetuity sequence $Y_n := B_1 + A_1 B_2 + \\cdots + (A_1 \\cdots A_{n-1}) B_n$, where $(A_i,B_i) \\subset (0,\\infty) \\times \\reals$. Estimates for the stationary tail dist......-time exceedance probabilities of $\\{ M_n^\\ast \\}$, yielding a new result concerning the convergence of $\\{ M_n^\\ast \\}$ to its stationary distribution.......In a variety of problems in pure and applied probability, it is of relevant to study the large exceedance probabilities of the perpetuity sequence $Y_n := B_1 + A_1 B_2 + \\cdots + (A_1 \\cdots A_{n-1}) B_n$, where $(A_i,B_i) \\subset (0,\\infty) \\times \\reals$. Estimates for the stationary tail...... distribution of $\\{ Y_n \\}$ have been developed in the seminal papers of Kesten (1973) and Goldie (1991). Specifically, it is well-known that if $M := \\sup_n Y_n$, then ${\\mathbb P} \\left\\{ M > u \\right\\} \\sim {\\cal C}_M u^{-\\xi}$ as $u \\to \\infty$. While much attention has been focused on extending...

  20. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  1. 48 CFR 32.402 - General.

    Science.gov (United States)

    2010-10-01

    ... adequate security; (ii) The advance payments will not exceed the unpaid contract price (see 32.410(b... REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 32.402 General. (a) A limitation on authority to grant advance payments under Pub. L. 85-804 (50 U.S.C. 1431-1435) is described at 50.102-3(b)(4...

  2. Climate change impacts on projections of excess mortality at ...

    Science.gov (United States)

    We project the change in ozone-related mortality burden attributable to changes in climate between a historical (1995-2005) and near-future (2025-2035) time period while incorporating a non-linear and synergistic effect of ozone and temperature on mortality. We simulate air quality from climate projections varying only biogenic emissions and holding anthropogenic emissions constant, thus attributing changes in ozone only to changes in climate and independent of changes in air pollutant emissions. We estimate non-linear, spatially varying, ozone-temperature risk surfaces for 94 US urban areas using observeddata. Using the risk surfaces and climate projections we estimate daily mortality attributable to ozone exceeding 40 p.p.b. (moderate level) and 75 p.p.b. (US ozone NAAQS) for each time period. The average increases in city-specific median April-October ozone and temperature between time periods are 1.02 p.p.b. and 1.94 °F; however, the results variedby region . Increases in ozone because of climate change result in an increase in ozone mortality burden. Mortality attributed to ozone exceeding 40 p.p.b. increases by 7.7% (1 .6-14.2%). Mortality attributed to ozone exceeding 75 p.p.b. increases by 14.2% (1.628.9%). The absolute increase in excess ozone mortality is larger for changes in moderate ozone levels, reflecting the larger number of days with moderate ozone levels. In this study we evaluate changes in ozone related mortality due to changes in biogenic f

  3. Impact of Functional Characteristics on Usage of LSS Methods in IT and Perceived Project Success

    Science.gov (United States)

    Mushi, Francis Jeremiah

    2014-01-01

    High rates of Information Technology (IT) project failures continues; fail to meet established deadlines, exceeding budget, or not agreed-upon functionality. Failure often results from a fundamental confusion over what is involved in the project. Methods that have provided project success in Service and Manufacturing industries have not been…

  4. Recruitment schemes in new nuclear projects

    International Nuclear Information System (INIS)

    Tielas, M.

    2012-01-01

    Contracting in New Nuclear Projects: A collaborative model between the Owner and the Supplier is described for building nuclear power plants, and is being implemented in the USA as well as in Europe to solve the problem of the risk in the initial investment as experienced in the past: widely exceeded budgets and construction schedules. (Author)

  5. Evaluation of scheduling problems for the project planning of large-scale projects using the example of nuclear facility dismantling; Evaluation von Schedulingproblemen fuer die Projektplanung von Grossprojekten am Beispiel des kerntechnischen Rueckbaus

    Energy Technology Data Exchange (ETDEWEB)

    Huebner, Felix; Schellenbaum, Uli; Stuerck, Christian; Gerhards, Patrick; Schultmann, Frank

    2017-05-15

    The magnitude of widespread nuclear decommissioning and dismantling, regarding deconstruction costs and project duration, exceeds even most of the prominent large-scale projects. The deconstruction costs of one reactor are estimated at several hundred million Euros and the dismantling period for more than a decade. The nuclear power plants built in the 1970s are coming closer to the end of their planned operating lifespan. Therefore, the decommissioning and dismantling of nuclear facilities, which is posing a multitude of challenges to planning and implementation, is becoming more and more relevant. This study describes planning methods for large-scale projects. The goal of this paper is to formulate a project planning problem that appropriately copes with the specific challenges of nuclear deconstruction projects. For this purpose, the requirements for appropriate scheduling methods are presented. Furthermore, a variety of possible scheduling problems are introduced and compared by their specifications and their behaviour. A set of particular scheduling problems including possible extensions and generalisations is assessed in detail. Based on the introduced problems and extensions, a Multi-mode Resource Investment Problem with Tardiness Penalty is chosen to fit the requirements of nuclear facility dismantling. This scheduling problem is then customised and adjusted according to the specific challenges of nuclear deconstruction projects. It can be called a Multi-mode Resource Investment Problem under the consideration of generalized precedence constraints and post-operational costs.

  6. Generalized isothermic lattices

    International Nuclear Information System (INIS)

    Doliwa, Adam

    2007-01-01

    We study multi-dimensional quadrilateral lattices satisfying simultaneously two integrable constraints: a quadratic constraint and the projective Moutard constraint. When the lattice is two dimensional and the quadric under consideration is the Moebius sphere one obtains, after the stereographic projection, the discrete isothermic surfaces defined by Bobenko and Pinkall by an algebraic constraint imposed on the (complex) cross-ratio of the circular lattice. We derive the analogous condition for our generalized isothermic lattices using Steiner's projective structure of conics, and we present basic geometric constructions which encode integrability of the lattice. In particular, we introduce the Darboux transformation of the generalized isothermic lattice and we derive the corresponding Bianchi permutability principle. Finally, we study two-dimensional generalized isothermic lattices, in particular geometry of their initial boundary value problem

  7. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  8. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk

  9. 7 CFR 1424.4 - General eligibility rules.

    Science.gov (United States)

    2010-01-01

    ... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOENERGY PROGRAM § 1424.4 General eligibility... be eligible for program payments, a producer must maintain records indicating for all relevant FY's.... (d) For producers not purchasing raw commodity inputs, the production must equal or exceed that...

  10. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  11. Real Hypersurfaces of Nonflat Complex Projective Planes Whose Jacobi Structure Operator Satisfies a Generalized Commutative Condition

    Directory of Open Access Journals (Sweden)

    Theocharis Theofanidis

    2016-01-01

    Full Text Available Real hypersurfaces satisfying the condition ϕl=lϕ(l=R(·,ξξ have been studied by many authors under at least one more condition, since the class of these hypersurfaces is quite tough to be classified. The aim of the present paper is the classification of real hypersurfaces in complex projective plane CP2 satisfying a generalization of ϕl=lϕ under an additional restriction on a specific function.

  12. 48 CFR 25.402 - General.

    Science.gov (United States)

    2010-10-01

    ... orexceeding) Constructioncontract (equal to or exceeding) WTO GPA $203,000 $203,000 $7,804,000 FTAs: Australia...,804,000 Morocco FTA 203,000 203,000 7,804,000 NAFTA: —Canada 25,000 70,079 9,110,318 —Mexico 70,079 70... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General. 25.402 Section 25...

  13. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  14. Project Lifespan-based Nonstationary Hydrologic Design Methods for Changing Environment

    Science.gov (United States)

    Xiong, L.

    2017-12-01

    Under changing environment, we must associate design floods with the design life period of projects to ensure the hydrologic design is really relevant to the operation of the hydrologic projects, because the design value for a given exceedance probability over the project life period would be significantly different from that over other time periods of the same length due to the nonstationarity of probability distributions. Several hydrologic design methods that take the design life period of projects into account have been proposed in recent years, i.e. the expected number of exceedances (ENE), design life level (DLL), equivalent reliability (ER), and average design life level (ADLL). Among the four methods to be compared, both the ENE and ER methods are return period-based methods, while DLL and ADLL are risk/reliability- based methods which estimate design values for given probability values of risk or reliability. However, the four methods can be unified together under a general framework through a relationship transforming the so-called representative reliability (RRE) into the return period, i.e. m=1/1(1-RRE), in which we compute the return period m using the representative reliability RRE.The results of nonstationary design quantiles and associated confidence intervals calculated by ENE, ER and ADLL were very similar, since ENE or ER was a special case or had a similar expression form with respect to ADLL. In particular, the design quantiles calculated by ENE and ADLL were the same when return period was equal to the length of the design life. In addition, DLL can yield similar design values if the relationship between DLL and ER/ADLL return periods is considered. Furthermore, ENE, ER and ADLL had good adaptability to either an increasing or decreasing situation, yielding not too large or too small design quantiles. This is important for applications of nonstationary hydrologic design methods in actual practice because of the concern of choosing the emerging

  15. Executive summary and general conclusions of the rock sealing project

    International Nuclear Information System (INIS)

    Pusch, R.

    1992-06-01

    The Stripa Rock Sealing Project logically followed the two first Stripa research phases dealing with canister-embedment and plugging of excavations in repositories. The major activities in the third phase were: * Literature review and interviews for setting the state of art of rock fracture sealing. * Pilot field and lab testing applying a new effective 'dynamic' grouting technique. * Development of a general grout flow theory. * Investigation of physical properties and longevity of major candidate grouts. * Performance of 4 large-scale tests. The literature study showed that longevity aspects limited the number of potentially useful grout materials to smectitic clay and cement. The pilot testing showed that fine-grained grouts can be effectively injected in relatively fine fractures. The theoretical work led to a general grout flow theory valid both for grouting at a constant, static pressure with non-Newtonian material properties, and for 'dynamic' injection with superimposed oscillations, yielding Newtonian material behavior. The investigation of physical properties of candidate grouts with respect to hydraulic conductivity, shear strength, sensitivity to mechanical strain, as well as to chemical stability, showed that effective sealing is offered, and that any rock can have its bulk conductivity reduced to about 10 -10 m/s. The field tests comprised investigation of excavation-induced disturbance and attempts to seal disturbed rock, and in separate tests, grouting of deposition holes and a natural fine-fracture zone. Considerable disturbance of nearfield rock by blasting and stress changes, yielding an increase in axial hydraulic conductivity by 3 and 1 order of magnitude, respectively, was documented but various factors, primarily debris in the fractures, made grouting of blasted rock ineffective. Narrow fractures in deposition holes and in a natural fracture zone were sealed rather effectively. (au)

  16. Developing a general practice library: a collaborative project between a GP and librarian.

    Science.gov (United States)

    Pearson, D; Rossall, H

    2001-12-01

    The authors report on a self-completed questionnaire study from a North Yorkshire based general practice regarding the information needs of its clinicians. The work was carried out with a particular focus on the practice library, and the findings identified that a new approach to maintaining and developing the library was needed. The literature regarding the information needs of primary care clinicians and the role of practice libraries is considered, and compared to those of the clinicians at the practice. Discussion follows on how a collaborative project was set up between the practice and a librarian based at the local NHS Trust library in order to improve the existing practice library. Difficulties encountered and issues unique to the project are explored, including training implications presented by the implementation of electronic resources. Marketing activities implemented are discussed, how the library will operate in its new capacity, and how ongoing support and maintenance of the library will be carried out. It is concluded that although scepticism still exists regarding librarian involvement in practice libraries, collaboration between clinicians and librarians is an effective approach to the successful development and maintenance of a practice library, and recommendations are therefore made for similar collaborative work.

  17. Prague’s Sewerage System in the 1930’ and the General Sewerage Project (1933–1936

    Directory of Open Access Journals (Sweden)

    K. Drnek

    2010-01-01

    Full Text Available Prague’s sewerage system was built at the end of the era of the monarchy in the united town that Prague was transformed into. The system was soon overloaded, and was not able to remove all the sewage produced by the citizens.To deal with this hygienic threat, the city council and the management of the wastewater services undertook several actions to build a new system or improve the existing system. The most ambitious and extensive measure was the general project carried out between 1933 and 1936.The project was invented to resolve the problem once and for all by introducing new ideas and cut out the problem of placing a new sewage plant instead of the old one. For the present-day observer it also offers a range of spectacular and interesting ideas on urban wastewater treatment.

  18. UMTRA Project water sampling and analysis plan: Canonsburg and Burrell, Pennsylvania

    International Nuclear Information System (INIS)

    1994-03-01

    Surface remedial action was completed at the Canonsburg and Burrell UMTRA Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. Results of 1993 water sampling indicate ground water flow conditions and ground water quality at both sites have remained relatively consistent with time. Uranium concentrations in ground water continue to exceed the maximum concentration limit (MCL) at the Canonsburg site; no MCLs are exceeded in ground water at the Burrell site. Surface water quality shows no evidence of impact from the sites

  19. Generalized projective chaos synchronization of gyroscope systems subjected to dead-zone nonlinear inputs

    International Nuclear Information System (INIS)

    Yau, H.-T.

    2008-01-01

    This Letter presents a robust control scheme to generalized projective synchronization between two identical two-degrees-of-freedom heavy symmetric gyroscopes with dead zone nonlinear inputs. Because of the nonlinear terms of the gyroscope system, the system exhibits complex and chaotic motions. By the Lyapunov stability theory with control terms, two suitable sliding surfaces are proposed to ensure the stability of the controlled closed-loop system in sliding mode. Then, two sliding mode controllers (SMC) are designed to guarantee the hitting of the sliding surfaces even when the control inputs contain dead-zone nonlinearity. This method allows us to arbitrarily direct the scaling factor onto a desired value. Numerical simulations show that this method works very well for the proposed controller

  20. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  1. Uniroyal Chemical`s remediation project meets or exceeds expectations

    Energy Technology Data Exchange (ETDEWEB)

    Anon,

    1997-11-01

    Recent remedial actions taken by Uniroyal Chemical Ltd at their Elmira, Ontario, plant have been considered. The company has been manufacturing a wide range of organic chemicals at this plant for use in agriculture and in the plastics and rubber industries since 1942. Historically, wastes were disposed of on-site, which while common practice at the time, caused soil and water contamination by N-nitrosodimethylamine (NDMA), volatile organic compounds such as benzene, toluene, and chlorobenzene, aniline, mercaptobenzothiazole and basic compounds such as ammonia. The local hydrogeology is fairly complex and consists of several aquifers and aquitards of which the Upper Aquifer (UA) and the Municipal Aquifer (MA) have been the primary concern. They have supplied all or part of the drinking water for the Kitchener-Waterloo area and the town of Elmira. After an extensive feasibility study, the decision was made to install shallow extension wells, and a system to treat the groundwater to acceptable criteria to discharge the treated water to the river system. Development of the system, which besides ten extraction wells includes a tertiary treatment process for UV oxidation, was described. The system has been in operation since January 1997. It affords 95 to 98 per cent of containment efficiency, 99 per cent ammonia removal, and 99.97 per cent of NDMA removal. Effluent requirements have been consistently met for all 18 primary contaminants, and no groundwater is being discharged into the river system.

  2. 23 CFR 710.301 - General.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false General. 710.301 Section 710.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY AND ENVIRONMENT RIGHT-OF-WAY AND REAL ESTATE Project Development § 710.301 General. The project development process typically follows a...

  3. Sound levels in a neonatal intensive care unit significantly exceeded recommendations, especially inside incubators.

    Science.gov (United States)

    Parra, Johanna; de Suremain, Aurelie; Berne Audeoud, Frederique; Ego, Anne; Debillon, Thierry

    2017-12-01

    This study measured sound levels in a 2008 built French neonatal intensive care unit (NICU) and compared them to the 2007 American Academy of Pediatrics (AAP) recommendations. The ultimate aim was to identify factors that could influence noise levels. The study measured sound in 17 single or double rooms in the NICU. Two dosimeters were installed in each room, one inside and one outside the incubators, and these conducted measurements over a 24-hour period. The noise metrics measured were the equivalent continuous sound level (L eq ), the maximum noise level (L max ) and the noise level exceeded for 10% of the measurement period (L 10 ). The mean L eq , L 10 and L max were 60.4, 62.1 and 89.1 decibels (dBA), which exceeded the recommended levels of 45, 50 and 65 dBA (p care was correlated to an increased noise level, except for a postconceptional age below 32 weeks. The sound levels significantly exceeded the AAP recommendations, particularly inside incubators. A multipronged strategy is required to improve the sound environment and protect the neonates' sensory development. ©2017 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  4. The DECADES project - Outline and general overview

    International Nuclear Information System (INIS)

    1995-01-01

    The environmental and health-related impacts of different energy systems, including those associated with the production of electricity, are emerging as significant issues for the coming decades. This interest is highlighted by the current debate about health effects of pollution, environmental damages due to acidification of forests and lakes, concerns about the safety of nuclear power plants and radioactive waste management, and the potential risks of global climate change induced by increasing atmospheric concentrations of carbon dioxide and other greenhouse gases. All fuel chains within the electricity generation system involve some health risks and lead to some environmental impacts. This fact, together with the emerging needs of many countries to define their energy programmes for the coming decades, has provided the basis for a growing interest in the application of improved data, tools and techniques for comparative assessment of different electricity generating systems, particularly from an environmental and human health viewpoint. The need to design and implement sustainable strategies in the electricity sector has been stressed in many international fora such as the Senior Expert Symposium on Electricity and the Environment (Helsinki, 1991), the United Nations Conference on Environment and Development (Rio de Janeiro, 1992) and the 15th Conference of the World Energy Council (Madrid, 1992). The essential goal of sustainable strategies is to provide the energy services required for supporting economic growth and improving quality of life, especially in developing countries, while minimising the health and environmental impacts of human activities. The inter-agency joint project on data bases and methodologies for comparative assessment of different energy sources for electricity generation [DECADES] has been established with the objective of enhancing capabilities for incorporating health and environmental issues in the comparative assessment of different

  5. Observed ozone exceedances in Italy: statistical analysis and modelling in the period 2002-2015

    Science.gov (United States)

    Falasca, Serena; Curci, Gabriele; Candeloro, Luca; Conte, Annamaria; Ippoliti, Carla

    2017-04-01

    Local ambient air quality is strongly influenced by anthropogenic emissions and meteorological conditions. The year 2015 is considered by NASA scientists as one of the hottest at the global scale since 1880. Furthermore, in Europe it was the first summer after the introduction of Euro6 regulation, the latest emission standard for passenger vehicles. The goal of this study is twofold: (1) the investigation of the impact of the heat wave occurred in the summer of 2015 on ozone levels and (2) the exploration of the weight of temperature as driver of high-level ozone events with respect to other variables. We performed a quantitative examination of the ozone seasons (May-September) for the period 2002-2015 using ozone concentration and weather data from 24 stations across Italy. The number of exceedances of limit values set by the European directive was calculated for each year, and compared with the trend of ozone concentration and temperature. Furthermore, the data were grouped in clusters of consecutive days of ozone exceedances in order to characterize the duration and the intensity of high ozone events. Finally, we developed a multivariate logistic regression model to investigate the role of a set of independent variables (meteorological, and temporal variables, altitude, number of inhabitants, vehicle emission standard) on the probability of exceedances. Results show that 2015 is one of the hottest years after 2003. During the period 2002-2015, the average number of exceedances per station of the daily maximum 8-hour average is often higher than the limit established by the European directive (25 per year). The highest number of exceedances was 65 per station, reached in 2003. The Po Valley is confirmed as a hot spot for pollution, with more frequent exceedances and a higher sensitivity to temperature, especially at urban sites. Ozone events in 2015 were fewer than recent years, but of longer duration (on average 4 days against 3 days), and with similar mean

  6. SWEIS Yearbook-2012 Comparison of 2012 Data to Projections of the 2008 Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Mahowald, Hallie B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wright, Marjorie Alys [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-01-16

    Los Alamos National Laboratory (LANL or the Laboratory) operations data for Calendar Year (CY) 2012 mostly fell within the 2008 Site-Wide Environmental Impact Statement (SWEIS) projections. Operation levels for one LANL facility exceeded the 2008 SWEIS capability projections—Radiochemistry Facility; however, none of the capability increases caused exceedances in radioactive air emissions, waste generation, or National Pollutant Discharge Elimination System (NPDES) discharge. Several facilities exceeded the2008 SWEIS levels for waste generation quantities; however, all were one-time, non-routine events that do not reflect the day-to-day operations of the Laboratory. In addition, total site-wide waste generation quantities were below SWEIS projections for all waste types, reflecting the overall levels of operations at both the Key and Non-Key Facilities. Although gas and electricity consumption have remained within the 2008 SWEIS limits for utilities, water consumption exceeded the 2008 SWEIS projections by 27 million gallons in CY 2012.

  7. Modelling the risk of Pb and PAH intervention value exceedance in allotment soils by robust logistic regression

    International Nuclear Information System (INIS)

    Papritz, A.; Reichard, P.U.

    2009-01-01

    Soils of allotments are often contaminated by heavy metals and persistent organic pollutants. In particular, lead (Pb) and polycyclic aromatic hydrocarbons (PAHs) frequently exceed legal intervention values (IVs). Allotments are popular in European countries; cities may own and let several thousand allotment plots. Assessing soil contamination for all the plots would be very costly. Soil contamination in allotments is often linked to gardening practice and historic land use. Hence, we predict the risk of IV exceedance from attributes that characterize the history and management of allotment areas (age, nearby presence of pollutant sources, prior land use). Robust logistic regression analyses of data of Swiss allotments demonstrate that the risk of IV exceedance can be predicted quite precisely without costly soil analyses. Thus, the new method allows screening many allotments at small costs, and it helps to deploy the resources available for soil contamination surveying more efficiently. - The contamination of allotment soils, expressed as frequency of intervention value exceedance, depends on the age and further attributes of the allotments and can be predicted by logistic regression.

  8. Relating road salt to exceedances of the water quality standard for chloride in New Hampshire streams.

    Science.gov (United States)

    Trowbridge, Philip R; Kahl, J Steve; Sassan, Dari A; Heath, Douglas L; Walsh, Edward M

    2010-07-01

    Six watersheds in New Hampshire were studied to determine the effects of road salt on stream water quality. Specific conductance in streams was monitored every 15 min for one year using dataloggers. Chloride concentrations were calculated from specific conductance using empirical relationships. Stream chloride concentrations were directly correlated with development in the watersheds and were inversely related to streamflow. Exceedances of the EPA water quality standard for chloride were detected in the four watersheds with the most development. The number of exceedances during a year was linearly related to the annual average concentration of chloride. Exceedances of the water quality standard were not predicted for streams with annual average concentrations less than 102 mg L(-1). Chloride was imported into three of the watersheds at rates ranging from 45 to 98 Mg Cl km(-2) yr(-1). Ninety-one percent of the chloride imported was road salt for deicing roadways and parking lots. A simple, mass balance equation was shown to predict annual average chloride concentrations from streamflow and chloride import rates to the watershed. This equation, combined with the apparent threshold for exceedances of the water quality standard, can be used for screening-level TMDLs for road salt in impaired watersheds.

  9. General-purpose heat source project and space nuclear safety fuels program. Progress report, February 1980

    International Nuclear Information System (INIS)

    Maraman, W.J.

    1980-05-01

    This formal monthly report covers the studies related to the use of 238 PuO 2 in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of the Los Alamos Scientific Laboratory. The two programs involved are: General-Purpose Heat Source Development and Space Nuclear Safety and Fuels. Most of the studies discussed here are of a continuing nature. Results and conclusions described may change as the work continues. Published reference to the results cited in this report should not be made without the explicit permission of the person in charge of the work

  10. General hybrid projective complete dislocated synchronization with non-derivative and derivative coupling based on parameter identification in several chaotic and hyperchaotic systems

    International Nuclear Information System (INIS)

    Sun Jun-Wei; Shen Yi; Zhang Guo-Dong; Wang Yan-Feng; Cui Guang-Zhao

    2013-01-01

    According to the Lyapunov stability theorem, a new general hybrid projective complete dislocated synchronization scheme with non-derivative and derivative coupling based on parameter identification is proposed under the framework of drive-response systems. Every state variable of the response system equals the summation of the hybrid drive systems in the previous hybrid synchronization. However, every state variable of the drive system equals the summation of the hybrid response systems while evolving with time in our method. Complete synchronization, hybrid dislocated synchronization, projective synchronization, non-derivative and derivative coupling, and parameter identification are included as its special item. The Lorenz chaotic system, Rössler chaotic system, memristor chaotic oscillator system, and hyperchaotic Lü system are discussed to show the effectiveness of the proposed methods. (general)

  11. 12 CFR 215.4 - General prohibitions.

    Science.gov (United States)

    2010-01-01

    .... (i) A member bank with deposits of less than $100,000,000 may by an annual resolution of its board of... of the date of the resolution; (C) The bank meets or exceeds, on a fully-phased in basis, all... 12 Banks and Banking 2 2010-01-01 2010-01-01 false General prohibitions. 215.4 Section 215.4 Banks...

  12. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  13. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  14. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  15. Ballistic Transport Exceeding 28 μm in CVD Grown Graphene.

    Science.gov (United States)

    Banszerus, Luca; Schmitz, Michael; Engels, Stephan; Goldsche, Matthias; Watanabe, Kenji; Taniguchi, Takashi; Beschoten, Bernd; Stampfer, Christoph

    2016-02-10

    We report on ballistic transport over more than 28 μm in graphene grown by chemical vapor deposition (CVD) that is fully encapsulated in hexagonal boron nitride. The structures are fabricated by an advanced dry van-der-Waals transfer method and exhibit carrier mobilities of up to three million cm(2)/(Vs). The ballistic nature of charge transport is probed by measuring the bend resistance in cross- and square-shaped devices. Temperature-dependent measurements furthermore prove that ballistic transport is maintained exceeding 1 μm up to 200 K.

  16. The DuPont, Monsanto, General Electric open-quotes Lasagnaclose quotes Remediation Project - joint R ampersand D and financing

    International Nuclear Information System (INIS)

    Palmer, P.A.

    1995-01-01

    The Lasagna project is the first of what we expect will be several large cooperative projects between industry consortia and government to develop improved remediation technologies. In 1992, Monsanto Company began contacting other major corporations to see if they were experiencing similar difficulties in applying cost-effective, or even workable technologies for industrial site remediation. Both General Electric and DuPont were early participants in the effort to develop a meeting with the EPA to discuss technical problems faced in cleanup, research needs, and ways to accelerate development of more cost-effective techniques. This paper provides some background on how this cooperative process came to reality, what the Lasagna process is and how the cooperative arrangements and financing are structured

  17. AegeanMarTech project: General Introduction

    Science.gov (United States)

    Psarra, S.; Zervakis, V.; Karageorgis, A. P.

    2017-10-01

    This issue of "Continental Shelf Research" is dedicated to the study of processes potentially responsible for the relatively high productivity of the North Aegean Sea in comparison to other regions of the Eastern Mediterranean. This region, one of the most important fishing grounds in the eastern Mediterranean, is characterized by: i) the inflow of mesotrophic waters of Black Sea (BSW) origin into the North Aegean and their interaction with the more saline Levantine waters (LW); and ii) the wind-generated coastal upwelling occurring every summer in the eastern Aegean. The study of these two natural fertilization mechanisms has been the major aim of the AegeanMarTech project ("Technological and oceanographic cooperation Network for the Study of mechanisms fertilizing the North-East Aegean Sea").

  18. 40 CFR 141.209 - Special notice for nitrate exceedances above MCL by non-community water systems (NCWS), where...

    Science.gov (United States)

    2010-07-01

    ... Water Violations § 141.209 Special notice for nitrate exceedances above MCL by non-community water... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Special notice for nitrate exceedances above MCL by non-community water systems (NCWS), where granted permission by the primacy agency under Â...

  19. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  20. Comparison of the General Electric BWR/6 standard plant design to the IAEA NUSS codes and guides

    International Nuclear Information System (INIS)

    D'Ardenne, W.H.; Sherwood, G.G.

    1985-01-01

    The General Electric BWR/6 Mark III standard plant design meets or exceeds current requirements of published International Atomic Energy Agency (IAEA) Nuclear Safety Standards (NUSS) codes and guides. This conclusion is based on a review of the NUSS codes and guides by General Electric and by the co-ordinated US review of the NUSS codes and guides during their development. General Electric compared the published IAEA NUSS codes and guides with the General Electric design. The applicability of each code and guide to the BWR/6 Mark III standard plant design was determined. Each code or guide was reviewed by a General Electric engineer knowledgeable about the structures, systems and components addressed and the technical area covered by that code or guide. The results of this review show that the BWR/6 Mark III standard plant design meets or exceeds the applicable requirements of the published IAEA NUSS codes and guides. The co-ordinated US review of the IAEA NUSS codes and guides corroborates the General Electric review. In the co-ordinated US review, the USNRC and US industry organizations (including General Electric) review the NUSS codes and guides during their development. This review ensures that the NUSS codes and guides are consistent with the current US government regulations, guidance and regulatory practices, US voluntary industry codes and standards, and accepted US industry design, construction and operational practices. If any inconsistencies are identified, comments are submitted to the IAEA by the USNRC. All US concerns submitted to the IAEA have been resolved. General Electric design reviews and the Final Design Approval (FDA) issued by the USNRC have verified that the General Electric BWR/6 Mark III standard plant design meets or exceeds the current US requirements, guidance and practices. Since these requirements, guidance and practices meet or exceed those of the NUSS codes and guides, so does the General Electric design. (author)

  1. MAXIMIZING PROFIT - OPTICAL TRADITIONAL TRAVEL AGENCIES EXCEEDED

    Directory of Open Access Journals (Sweden)

    ENEA CONSTANŢA

    2013-12-01

    Full Text Available Recently concepts of globalized the services the advertising only that and substantial modifications, but that just radicals, in the structure net of touristic states. Is directed to of a new conceive the organic fashions of structures ale net of realized and of casting of guy colaborative, baze on interconexion, the interface and flexible interactions, from which his. I result the competitive advantages popularly the partners of business. The optics traditional agencies of tourings considered the production and the delivery touristic services except through the of a alone objective major prism scilicet maximizarea of the profits, falls to is exceeded. For the past decades ale the century XX, the impact technological changes in the industry services becomes all determine maul influenced the „traditional sectors” in charge, as for example the education, the trade, the touring, the informatics. Certainly, globalized can be interpretation in different senses. Referenced to the touristic services, the globalized is define as be a form an advanced still more complex maul of which nationalization involves a degrees of functional integration between the touristic activities disperse on plans transfrontalier.

  2. Mismanagement Reasons of the Projects Execution Phase

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Agele

    2017-10-01

    Full Text Available The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts., in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area. Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

  3. Derivation and Mapping of Critical Loads for Nitrogen and Trends in Their Exceedance in Germany

    Directory of Open Access Journals (Sweden)

    Hans-Dieter Nagel

    2001-01-01

    Full Text Available The term “critical load” means a quantitative estimate of an exposure to one or more pollutants below which significant harmful effects on specified sensitive elements of the environment do not occur, according to present knowledge. In the case of nitrogen, both oxidised and reduced compounds contribute to the total deposition of acidity, which exceeds critical loads in many forest ecosystems. These also cause negative effects through eutrophication. Critical loads of nitrogen were derived for forest soils (deciduous and coniferous forest, natural grassland, acid fens, heathland, and mesotrophic peat bogs. In Germany, a decrease in sulphur emissions over the past 15 years resulted in a reduced exceedance of critical loads for acid deposition. In the same period it was noted that reduction in the emissions of nitrogen oxides and ammonia remained insignificant. Therefore, emissions of nitrogen compounds have become relatively more important and will continue to threaten ecosystem function and stability. The risk of environmental damage remains at an unacceptable level. The German maps show the degree to which the critical loads are exceeded, and they present current developments and an expected future trend. Results indicate that recovery from pollutant stress occurs only gradually.

  4. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  5. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  6. Saharan dust contribution to PM levels: The EC LIFE+ DIAPASON project

    Science.gov (United States)

    Gobbi, G. P.; Wille, H.; Sozzi, R.; Angelini, F.; Barnaba, F.; Costabile, F.; Frey, S.; Bolignano, A.; Di Giosa, A.

    2012-04-01

    The contribution of Saharan-dust advections to both daily and annual PM average values can be significant all over Southern Europe. The most important effects of dust on the number of PM exceedances are mostly observed in polluted areas and large cities. While a wide literature exists documenting episodes of Saharan dust transport towards the Euro-Mediterranean region and Europe in general, a limited number of studies are still available providing statistically significant results on the impact of Saharan dust on the particulate matter loads over the continent. A four-year (2001-2004) study performed in Rome (Italy) found these events to contribute to the average ground PM10 with about 15±10 µg/m3 on about 17% of the days in a year. Since the PM10 yearly average of many traffic stations in Rome is close to 40 μg/m3, these events can cause the PM10 concentration to exceed air quality limit values (50 μg/m3 as daily average) set by the EU Air Quality Directive 2008/50/EC. Although the European legislation allows Member States to subtract the contribution of natural sources before counting PM10 exceedances, definition of an optimal methodology to quantitatively assess such contribution is still in progress. On the basis of the current European Guidelines on the assessment of natural contributions to PM, the DIAPASON project ("Desert-dust Impact on Air quality through model-Predictions and Advanced Sensors ObservatioNs", recently funded under the EC LIFE+ program) has been formulated to provide a robust, user-oriented methodology to assess the presence of desert dust and its contribution to PM levels. To this end, in addition to satellite-based data and model forecasts, the DIAPASON methodology will employ innovative and affordable technologies, partly prototyped within the project itself, as an operational Polarization Lidar-Ceilometer (laser radar) capable of detecting and profiling dust clouds from the ground up to 10 km altitude. The DIAPASON Project (2011

  7. 18 CFR 801.4 - Project review.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Project review. 801.4 Section 801.4 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water...

  8. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  9. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  10. What could have caused pre-industrial biomass burning emissions to exceed current rates?

    NARCIS (Netherlands)

    Werf, van der G.R.; Peters, W.; Leeuwen, van T.T.; Giglio, L.

    2013-01-01

    Recent studies based on trace gas mixing ratios in ice cores and charcoal data indicate that biomass burning emissions over the past millennium exceeded contemporary emissions by up to a factor of 4 for certain time periods. This is surprising because various sources of biomass burning are linked

  11. What could have caused pre-industrial biomass burning emissions to exceed current rates?

    NARCIS (Netherlands)

    van der Werf, G. R.; Peters, W.; van Leeuwen, T. T.; Giglio, L.

    2012-01-01

    Recent studies based on trace gas mixing ratios in ice cores and charcoal data indicate that biomass burning emissions over the past millennium exceeded contemporary emissions by up to a factor of 4 for certain time periods. This is surprising because various sources of biomass burning are linked

  12. General-purpose heat source project and space nuclear safety and fuels program. Progress reportt, January 1980

    International Nuclear Information System (INIS)

    Maraman, W.J.

    1980-04-01

    This formal monthly report covers the studies related to the use of 238 PuO 2 in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of the Los Alamos Scientific Laboratory. The two programs involved are the general-purpose heat source development and space nuclear safety and fuels. Most of the studies discussed here are of a continuing nature. Results and conclusions described may change as the work continues. Published reference to the results cited in this report should not be made without the explicit permission of the person in charge of the work

  13. Trends in diabetes incidence from 1992 to 2015 and projections for 2024: A Portuguese General Practitioner's Network study.

    Science.gov (United States)

    de Sousa-Uva, Mafalda; Antunes, L; Nunes, B; Rodrigues, A P; Simões, J A; Ribeiro, R T; Boavida, J M; Matias-Dias, C

    2016-10-01

    Diabetes is known as a major cause of morbidity and mortality worldwide. Portugal is known as the European country with the highest prevalence of this disease. While diabetes prevalence data is updated annually in Portugal, the General Practitioner's (GP) Sentinel Network represents the only data source on diabetes incidence. This study describes the trends in Diabetes incidence, between 1992 and 2015, and estimate projections for the future incidence rates in Portugal until 2024. An ecological time-series study was conducted using data from GP Sentinel Network between 1992 and 2015. Family doctors reported all new cases of Diabetes in their patients' lists. Annual trends were estimated through Poisson regression models as well as the future incidence rates (until 2024), sex and age group stratified. Incidence rate projections were adjusted to the distribution of the resident Portuguese population given Statistics Portugal projections. The average increase in Diabetes incidence rate was in total 4.29% (CI95% 3.80-4.80) per year under study. Until 1998-2000, the annual incidence rate was higher in women, and from 1998-2000 to 2013-2015 turn out to be higher in men. The incidence rate projected for 2022-2024 was 972.77/10(5) inhabitants in total, and 846.74/10(5) and 1114.42/10(5), respectively, in women and men. This is the first study in Portugal to estimate diabetes incidence rate projections. The disturbing reported projections seem realistic if things continue as in the past. Actually, effective public health policies will need to be undertaken to minimize this alarming future scenario. Copyright © 2016 Primary Care Diabetes Europe. Published by Elsevier Ltd. All rights reserved.

  14. 33 CFR 385.13 - Projects implemented under additional program authority.

    Science.gov (United States)

    2010-07-01

    ... Implementation Report is prepared and approved in accordance with § 385.26; and (3) Not exceed a total cost of... RESTORATION PLAN CERP Implementation Processes § 385.13 Projects implemented under additional program authority. (a) To expedite implementation of the Plan, the Corps of Engineers and non-Federal sponsors may...

  15. Army Corps of Engineers: Peer Review Process for Civil Works Project Studies Can Be Improved

    Science.gov (United States)

    2012-03-01

    exceeding $45 million EIS Cost of peer review contract Western C-111 Spreader Canal Project Implementation Report Jacksonville South...Federal Programs Congressional Relations Public Affairs Please Print on Recycled Paper.

  16. 40 CFR 141.208 - Special notice for exceedance of the SMCL for fluoride.

    Science.gov (United States)

    2010-07-01

    ... exceed 2 mg/l because of this cosmetic dental problem. For more information, please call [name of water system contact] of [name of community water system] at [phone number]. Some home water treatment units... drinking water provided by your community water system [name] has a fluoride concentration of [insert value...

  17. 33 CFR 203.49 - Rehabilitation of Hurricane and Shore Protection Projects.

    Science.gov (United States)

    2010-07-01

    ... Protection Projects. (a) Authority. The Chief of Engineers is authorized to rehabilitate any Federally authorized hurricane or shore protection structure damaged or destroyed by wind, wave, or water action of an... (exclusive of dredge mobilization and demobilization costs) exceeds $1 million and is greater than two...

  18. Projection display technologies for the new millennium

    Science.gov (United States)

    Kahn, Frederic J.

    2000-04-01

    Although analog CRTs continue to enable most of the world's electronic projection displays such as US consumer rear projection televisions, discrete pixel (digital) active matrix LCD and DLP reflective mirror array projectors have rapidly created large nonconsumer markets--primarily for business. Recent advances in image quality, compactness and cost effectiveness of digital projectors have the potential to revolutionize major consumer and entertainment markets as well. Digital penetration of the mainstream consumer projection TV market will begin in the hear 2000. By 2005 digital projection HDTVs could take the major share of the consumer HDTV projection market. Digital projection is expected to dominate both the consumer HDTV and the cinema market by 2010, resulting in potential shipments for all projection markets exceeding 10 M units per year. Digital projection is improving at a rate 10X faster than analog CRT projectors and 5X faster than PDP flat panels. Continued rapid improvement of digital projection is expected due to its relative immaturity and due to the wide diversity of technological improvements being pursued. Key technology enablers are the imaging panels, light sources and micro-optics. Market shares of single panel projectors, MEMs panels, LCOS panels and low T p-Si TFT LCD panel variants are expected to increase.

  19. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  20. Exceedance probability map: a tool helping the definition of arsenic Natural Background Level (NBL) within the Drainage Basin to the Venice Lagoon (NE Italy)

    Science.gov (United States)

    Dalla Libera, Nico; Fabbri, Paolo; Mason, Leonardo; Piccinini, Leonardo; Pola, Marco

    2017-04-01

    estimates the spatial distribution of the exceedance probabilities respect some pre-defined thresholds. This approach is largely mentioned in literature to face similar environmental problems. To test the validity of the procedure, we used the dataset from "A.Li.Na" project (founded by the Regional Environmental Agency) that defined regional NBLs of As, Fe, Mn and NH4+ into DBVL's groundwater. Primarily, we defined two thresholds corresponding respectively to the IDWS and the median of the data over the IDWS. These values were decided basing on the dataset's statistical structure and the quality criteria of the GWD 2006/118/EC. Subsequently, we evaluated the spatial distribution of the probability to exceed the defined thresholds using the Indicator kriging. The results highlight different zones with high exceedance probability ranging from 75% to 95% respect both the IDWS and the median value. Considering the geological setting of the DBVL, these probability values correspond with the occurrence of both organic matter and reducing conditions. In conclusion, the spatial prediction of the exceedance probability could be useful to define the areas in which estimate the local NBLs, enhancing the procedure of NBL definition. In that way, the NBL estimation could be more realistic because it considers the spatial distribution of the studied contaminant, distinguishing areas with high natural concentrations from polluted ones.

  1. Proposal for the Extension of a Project Agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2002-01-01

    This document concerns the extension of the scope of work covered by a project agreement with the ISTC, entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medicine and Pharmacology" which was approved by Finance Committee on 19 September 2001 (CERN/FC/4478). For the reasons set out in this document, the Finance Committee is invited to approve the extension of the scope of work covered by the above project agreement for the optimisation of the technology for a total amount of 160 000 US dollars. This extension will be partially funded by two external sponsors (RAYTEST - DE and the UNIVERSITY OF LAUSANNE - CH) at the level of 90 000 US dollars. CERN's contribution, which will be funded by revenue generated by its technology transfer activities, will not exceed 70 000 US dollars. This extension will bring the total amount of the Project Agreement to 935 000 US dollars, of which CERN's total contribution will not exceed 320 000 US dollars...

  2. Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    The purpose of this environmental assessment (EA) is to provide the U.S. Department of Energy (DOE) and the public with information on potential environmental impacts associated with the development of the Ponnequin Wind Energy Project in Colorado. This EA and public comments received on it will be used in DOE`s deliberations on whether to release funding for the project. This document provides a detailed description of the proposed project and an assessment of potential impacts associated with its construction and operations. Resources and conditions considered in the analysis include streams; wetlands; floodplains; water quality; soils; vegetation; air quality; socioeconomic conditions; energy resources; noise; transportation; cultural resources; visual and land use resources; public health and safety; wildlife; threatened, endangered, and candidate species; and cumulative impacts. The analysis found that the project would have minimal impacts on these resources and conditions, and would not create impacts that exceed the significance criteria defined in this document. 90 refs., 5 figs.

  3. THE FORMATION OF A CAPITAL INVESTMENT PROJECT INDUSTRIAL ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Y. S. Potashnik

    2015-01-01

    Full Text Available The article specifies the main sources of financing of investment projects of industrial enterprises, among which are proposed to distinguish between belonging to the participants (shareholders of the company and others. Shows the sequence and content of the steps in building the industrial enterprises of a specific capital investment project. The main requirements for the capital structure of the investment project. As such invited to consider the requirements for the financial feasibility of the project, minimize the cost of capital of the project, the need for additional investments and changes of property shares members of the company, and not exceeding the maximum level of the probability of occurrence of insolvency of the enterprise. The approach allowing to assess the adequacy of the probability of occurrence of insolvency of the enterprise in one way or another the capital structure of the project the maximum allowable (limit level. The methodical examples of basic calculations.

  4. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  5. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  6. Effect of the Apulia air quality plan on PM10 and benzo(apyrene exceedances

    Directory of Open Access Journals (Sweden)

    L. Trizio

    2016-03-01

    Full Text Available During the last years, several exceedances of PM10 and benzo(apyrene limit values exceedances were recorded in Taranto, a city in southern Italy included in so-called areas at high risk of environmental crisis because of the presence of a heavy industrial district including the largest steel factory in Europe. A study of these critical pollution events showed a close correlation with the wind coming from the industrial site to the adjacent urban area. During 2011, at monitoring sites closes to the industrial area, at least the 65% of PM10 exceedances were related to wind day conditions (characterized by at least 3 consecutive hours of wind coming from 270-360±2deg with an associated speed higher than 7 m/s. For this reason, in 2012 an integrated environmental permit and a regional air quality plan were enacted to reduce pollutant emissions from industrial plants. A study of PM10 levels registered during windy days was performed during critical episodes of pollution highlighting that the difference between windy days and no windy days’ concentrations reduces from 2012 to 2014 in industrial site. False negative events (verified ex-post by observed meteorological data not identified by the forecast model - did not show a significant influence on PM concentration: PM10 values were comparable and sometimes lower than windy days levels. It is reasonable that the new scenario with a relevant reduction emissions form Ilva plant reduced the pollutants contribution from industrial area, contributing to PM10 levels decrease, also in false negative events.

  7. Capital Projects Application (CPA)

    Data.gov (United States)

    General Services Administration — Capital Projects application (CPA) provides users with the ability to maintain project related financial data for Budget Activity (BA) 51, 55, 64, 01, 02, 03, 04....

  8. The Okapi Projects.

    Science.gov (United States)

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  9. Specifying general activity clusters for ERP projects aimed at effort prediction

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Gunasekaran, A.; Shea, T.

    2010-01-01

    ERP implementation projects affect large parts of an implementing organization and lead to changes in the way an organization performs its tasks. The costs needed for the effort to implement these systems are hard to estimate. Research indicates that the size of an ERP project can be a useful

  10. Air pollution by ozone in Europe in summer 2003 - Overview of exceedances of EC ozone threshold values during the summer season April-August 2003 and comparisons with previous years

    Energy Technology Data Exchange (ETDEWEB)

    Fiala, J.; Cernikovsky, L.; Leeuw, F. de; Kurfuerst, P.; Aalst, R. van (eds.)

    2003-07-01

    In the period 1995-2003 of reporting tinder the old ozone directive, there has been little or no change in the reported exceedances of ozone threshold values. This is not unexpected as reductions in the EU emissions of nitrogen oxides and nonmethane volatile organic compounds, the main ozone precursors, have so far been limited - about 30 % between 1990 and 2000. 2010 under the national emission teilings directive. While peak ozone concentrations seem to go down, ozone concentration statistics relevant to the target values set in the new ozone directive show little or no reduction in the period 1996-2000. Very few stations actually show a significant downward trend for these stabstics. The threshold for warning the population continues to be exceeded on a few occasions Bach year, while the threshold for informing the population is exceeded at riost stations in most countries (outside northern Europe and Ireland) each year, generally more so in warm summers. These exceedances are likely to retur in years with temperatures above the long-term average until there is a substantially larger decrease in precursor emissions. A further reduction of about 30 % is foreseen towards Under current legislation and with the rate of turnover of the vehicle fleet, furtber reductions will gradually occur towards 2010, and further reductions may be necessary to achieve the target values of the new ozone directive. Note that, due to the uncertainties caused by year-to-year meteorological variations and the changes in the monitoring station configuration, these conclusions are tentative. (au)

  11. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W.E. [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A.S.R. [Riocell, S.A. (Brazil); Saber, A. [IEA-Instituto de Estudos Avancados (Brazil)] [and others

    1995-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  12. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W E [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A S.R. [Riocell, S.A. (Brazil); Saber, A [IEA-Instituto de Estudos Avancados (Brazil); and others

    1996-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  13. Proposal for a project agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2001-01-01

    This document concerns a project agreement with the ISTC entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medecine and Pharmacology" to be executed in co-operation with the Crystal Clear Collaboration. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a project agreement with ISTC for a total amount of 775 000 US dollars. The European Union party in ISTC will co-fund the project up to a total of 525 000 US dollars. CERN's contribution will not exceed 250 000 US dollars. At the present rate of exchange this is equivalent to approximately 430 000 Swiss francs

  14. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  15. Impact analysis of TOTEM data at the LHC: black disk limit exceeded

    CERN Document Server

    Alkin, A; Kovalenko, O; Troshin, S M

    2015-01-01

    We discuss the profile of the impact--parameter dependent elastic scattering amplitude. Extraction of impact-parameter dependence from the dataset with inclusion of the experimental data on elastic scattering at the LHC energies helps to reveal the asymptotics of hadron interactions. Analysis of the data clearly indicates that the impact-parameter elastic scattering amplitude exceed the black disk limit at the LHC energy 7TeV and the inelastic overlap function reaches its maximum value at $b>0$

  16. Generalized Filtered Back-Projection for Digital Breast Tomosynthesis Reconstruction

    NARCIS (Netherlands)

    Erhard, K.; Grass, M.; Hitziger, S.; Iske, A.; Nielsen, T.

    2012-01-01

    Filtered back-projection (FBP) has been commonly used as an efficient and robust reconstruction technique in tomographic X-ray imagingduring the last decades. For limited angle tomography acquisitions such as digital breast tomosynthesis, however, standard FBP reconstruction algorithms provide poor

  17. Robust Adaptive Sliding Mode Control for Generalized Function Projective Synchronization of Different Chaotic Systems with Unknown Parameters

    Directory of Open Access Journals (Sweden)

    Xiuchun Li

    2013-01-01

    Full Text Available When the parameters of both drive and response systems are all unknown, an adaptive sliding mode controller, strongly robust to exotic perturbations, is designed for realizing generalized function projective synchronization. Sliding mode surface is given and the controlled system is asymptotically stable on this surface with the passage of time. Based on the adaptation laws and Lyapunov stability theory, an adaptive sliding controller is designed to ensure the occurrence of the sliding motion. Finally, numerical simulations are presented to verify the effectiveness and robustness of the proposed method even when both drive and response systems are perturbed with external disturbances.

  18. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  19. Global projections of extreme sea levels in view of climate change

    Science.gov (United States)

    Vousdoukas, M. I.; Feyen, L.; Voukouvalas, E.; Mentaschi, L.; Verlaan, M.; Jevrejeva, S.; Jackson, L. P.

    2017-12-01

    Global warming is expected to drive increasing extreme sea levels (ESLs) and flood risk along the world's coasts. The present contribution aims to present global ESL projections obtained by combining dynamic simulations of all the major ESL components during the present century, considering the latest CMIP5 projections for RCP4.5 and RCP8.5. Baseline values are obtained combining global re-analyses of tides, waves, and storm surges, including the effects of tropical cyclones. The global average RSLR is projected around 20 and 24 cm by the 2050s under RCP4.5 and RCP8.5, respectively and is projected to reach 46 and 67 cm by the year 2100. The largest increases in MSL are projected along the South Pacific, Australia and West Africa, while the smaller RSLR is projected around East North America, and Europe. Contributions from waves and storm surges show a very weak increasing global trend, which becomes statistically significant only towards the end of the century and under RCP8.5. However, for areas like the East China Sea, Sea of Japan, Alaska, East Bering Sea, as well as the Southern Ocean, climate extremes could increase up to 15%. By the end of this century the 100-year event ESL along the world's coastlines will on average increase by 48 cm for RCP4.5 and 75 cm for RCP8.5. The strongest rise is projected along the Southern Ocean exceeding 1 m under RCP8.5 by the end of the century. Increase exceeding 80 cm is projected for East Asia, West North America, East South America, and the North Indian Ocean. Considering always the business as usual and the year 2100, the lowest increase in ESL100 is projected along the East North America and Europe (below 50 cm). The present findings indicate that, under both RCPs, by the year 2050 the present day 100-year event will occur every 5 years along a large part of the tropics, rendering coastal zones exposed to intermittent flood hazard.

  20. Application of at-site peak-streamflow frequency analyses for very low annual exceedance probabilities

    Science.gov (United States)

    Asquith, William H.; Kiang, Julie E.; Cohn, Timothy A.

    2017-07-17

    The U.S. Geological Survey (USGS), in cooperation with the U.S. Nuclear Regulatory Commission, has investigated statistical methods for probabilistic flood hazard assessment to provide guidance on very low annual exceedance probability (AEP) estimation of peak-streamflow frequency and the quantification of corresponding uncertainties using streamgage-specific data. The term “very low AEP” implies exceptionally rare events defined as those having AEPs less than about 0.001 (or 1 × 10–3 in scientific notation or for brevity 10–3). Such low AEPs are of great interest to those involved with peak-streamflow frequency analyses for critical infrastructure, such as nuclear power plants. Flood frequency analyses at streamgages are most commonly based on annual instantaneous peak streamflow data and a probability distribution fit to these data. The fitted distribution provides a means to extrapolate to very low AEPs. Within the United States, the Pearson type III probability distribution, when fit to the base-10 logarithms of streamflow, is widely used, but other distribution choices exist. The USGS-PeakFQ software, implementing the Pearson type III within the Federal agency guidelines of Bulletin 17B (method of moments) and updates to the expected moments algorithm (EMA), was specially adapted for an “Extended Output” user option to provide estimates at selected AEPs from 10–3 to 10–6. Parameter estimation methods, in addition to product moments and EMA, include L-moments, maximum likelihood, and maximum product of spacings (maximum spacing estimation). This study comprehensively investigates multiple distributions and parameter estimation methods for two USGS streamgages (01400500 Raritan River at Manville, New Jersey, and 01638500 Potomac River at Point of Rocks, Maryland). The results of this study specifically involve the four methods for parameter estimation and up to nine probability distributions, including the generalized extreme value, generalized

  1. Development of derived investigation levels for use in internal dosimetry at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Johnson, P.

    1991-01-01

    The objective was to determine if the routine intemal dosimetry program at the West Valley Demonstration Project is capable of meeting the performance objective of 1 mSv annual effective dose equivalent due to internal contamination. With the use of the computer code REMedy the annual effective dose equivalent is calculated. Some of the radionuclides of concern result in an annual effective dose equivalent that exceeds the performance objective. Although the results exceed the performance objective, in all but two cases they do not exceed the US DOE regulatory limits. In these instances the Th-232 and Am-241 were determined to exceed the committed dose equivalent limit to their limiting tissue. In order to document the potential missed dose for regulatory compliance, Sr-90 is used as an indicator for Th-232. For Am-241 an investigation as to whether or not the minimum detectable amount can be lowered is performed. The derived investigation levels as a result of this project are 4.9E3 Bq/lung count for Co-60, 2.2E4 Bq/lung count for Cs-137, 1.9 Bq/1 for Sr-90 and for radionuclides other than Sr-90 any value greater than or equal to three standard deviations above their net count is considered to require further investigation

  2. Switched generalized function projective synchronization of two identical/different hyperchaotic systems with uncertain parameters

    International Nuclear Information System (INIS)

    Li Hongmin; Li Chunlai

    2012-01-01

    In this paper, we investigate two switched synchronization schemes, namely partial and complete switched generalized function projective synchronization, by using the adaptive control method. Partial switched synchronization of chaotic systems means that the state variables of the drive system synchronize with partial different state variables of the response system, whereas complete switched synchronization of chaotic systems means that all the state variables of the drive system synchronize with complete different state variables of the response system. Because the switched synchronization scheme exists in many combinations, it is a promising type of synchronization as it provides greater security in secure communications. Based on the Lyapunov stability theory, the adaptive control laws and the parameter update laws are derived to make the states of two identical/different hyperchaotic systems asymptotically synchronized up to a desired scaling function. Finally, numerical simulations are performed to verify and illustrate the analytical results.

  3. Design Theory Projectability

    DEFF Research Database (Denmark)

    Baskerville, Richard; Pries-Heje, Jan

    2014-01-01

    design science research is materially prescriptive, it requires a different perspective in developing the breadth of applications of design theories. In this paper we propose different concepts that embody forms of general technological knowledge The concept of projectability, developed originally......Technological knowledge has been characterized as having a scope that is specific to a particular problem. However, the information systems community is exploring forms of design science research that provide a promising avenue to technological knowledge with broader scope: design theories. Because...... as a means of distinguishing realized generalizations from unrealized generalizations, helps explain how design theories, being prescriptive, possess a different form of applicability. The concept of entrenchment describes the use of a theory in many projections. Together these concepts provide a means...

  4. Het Project Monitoring Risicofactoren en Gezondheid Nederland (MORGEN-project). Jaarverslag 1993

    NARCIS (Netherlands)

    Smit HA; Verschuren WMM; Bueno de Mesquita HB; Seidell JC; CCM

    1994-01-01

    The Monitoring Project on Risk Factors for Chronic Diseases (MORGEN-project) is conducted by the National Institute of Public Health and Environmental Protection (RIVM). Its general purpose is to determine the prevalence of risk factors for chronic diseases as well as the prevalence of some specific

  5. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  6. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  7. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  8. White dwarf stars exceeding the Chandrasekhar mass limit

    Science.gov (United States)

    Tomaschitz, Roman

    2018-01-01

    The effect of nonlinear ultra-relativistic electron dispersion on the mass-radius relation of high-mass white dwarfs is studied. The dispersion is described by a permeability tensor in the Dirac equation, generated by the ionized high-density stellar matter, which constitutes the neutralizing background of the nearly degenerate electron plasma. The electron dispersion results in a stable mass-radius relation for high-mass white dwarfs, in contrast to a mass limit in the case of vacuum permeabilities. In the ultra-relativistic regime, the dispersion relation is a power law whose amplitude and scaling exponent is inferred from mass and radius estimates of two high-mass white dwarfs, Sirius B and LHS 4033. Evidence for the existence of super-Chandrasekhar mass white dwarfs is provided by several Type Ia supernovae (e.g., SN 2013cv, SN 2003fg, SN 2007if and SN 2009dc), whose mass ejecta exceed the Chandrasekhar limit by up to a factor of two. The dispersive mass-radius relation is used to estimate the radii, central densities, Fermi temperatures, bulk and compression moduli and sound velocities of their white dwarf progenitors.

  9. The international Chernobyl project

    International Nuclear Information System (INIS)

    1991-01-01

    This article summarizes the official report of the International Advisory Committee at the conference of the International Chernobyl Project held in Vienna, May 1991. More details will be found in the actual report, ''The International Chernobyl Project: An Overview'' (INI22:066284/5). Measurements and assessments carried out under the project provided general corroboration of the levels of surface cesium-137 contamination reported in the official maps. The project also concluded that the official procedures for estimating radiation doses to the population were scientifically sound, although they generally resulted in overestimates of two- to threefold. The project could find no marked increase in the incidence of leukemia or cancer, but reported absorbed thyroid doses in children might lead to a statistically detectable rise in the incidence of thyroid tumors. Significant non-radiation-related health disorders were found, and the accident had substantial psychological consequences in terms of anxiety and stress. The project concluded that the protective measures taken were too extreme, and that population relocation and foodstuff restrictions should have been less extensive

  10. Deep Help in Complex Project Work: Guiding and Path-Clearing Across Difficult Terrain

    OpenAIRE

    Fisher, Colin M.; Pillemer, Julianna; Amabile, Teresa M.

    2017-01-01

    How do teams working on complex projects get the help they need? Our qualitative investigation of the help provided to project teams at a prominent design firm revealed two distinct helping processes, both characterized by deep, sustained engagement that far exceeds the brief interactions described in the helping literature. Such deep help consisted of (1) guiding a team through a difficult juncture by working with its members in several prolonged, tightly clustered sessions, or (2) path-clea...

  11. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  12. Consideration of Risk in PPP-Projects

    Directory of Open Access Journals (Sweden)

    Josef Zimmermann

    2014-06-01

    Full Text Available Risk management has become a core competence for companies operating in construction services. In particular regarding Real Estate Development and Construction Management the fundamental knowledge and the dedicated ap- plication of risk assessment turn out to be critical. Construction Management deals with a multitude of local and temporal issues which are unknown or only given by statistical evaluation while conducting a unique construction project within a very tight frame of budget and time. Real Estate projects focus on the predictability of profitable operation for a fairly long period in advance and are therefore subject to many more and more voluminous uncertainties. With PPP-projects a more or less complete federal task is awarded to a private company. Its extent varies but com- prises at least design, construction and operation of a real estate project, e.g. a toll road, bridge, tunnel or other infrastructural object. Durations of such contracts of- ten extend to some 20 to 30 years. In this article the applicability of traditional means of risk management is inves- tigated for the use on PPP-projects and limits of risk consequences are pointed out. Finally we come to the conclusion, that the resulting unavertable risks tend to exceed every surcharge that could be successfully placed on a market.

  13. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  14. Climate Change Impacts on Projections of Excess Mortality at 2030 using Spatially-Varying Ozone-Temperature Risk Surfaces

    Science.gov (United States)

    Wilson, Ander; Reich, Brian J.; Nolte, Christopher G.; Spero, Tanya L.; Hubbell, Bryan; Rappold, Ana G.

    2017-01-01

    We project the change in ozone-related mortality burden attributable to changes in climate between a historical (1995–2005) and near-future (2025–2035) time period while incorporating a nonlinear and synergistic effect of ozone and temperature on mortality. We simulate air quality from climate projections varying only biogenic emissions and holding anthropogenic emissions constant, thus attributing changes in ozone only to changes in climate and independent of changes in air pollutant emissions. We estimate nonlinear, spatially-varying, ozone-temperature risk surfaces for 94 US urban areas using observed data. Using the risk surfaces and climate projections we estimate daily mortality attributable to ozone exceeding 40 ppb (moderate level) and 75 ppb (US ozone NAAQS) for each time period. The average increases in city-specific median April-October ozone and temperature between time periods are 1.02 ppb and 1.94°F; however, the results varied by region. Increases in ozone due to climate change result in an increase in ozone-mortality burden. Mortality attributed to ozone exceeding 40 ppb increases by 7.7% (1.6%, 14.2%). Mortality attributed to ozone exceeding 75 ppb increases by 14.2% (1.6%, 28.9%). The absolute increase in excess ozone mortality is larger for changes in moderate ozone levels, reflecting the larger number of days with moderate ozone levels. PMID:27005744

  15. Angalasut, an education and outreach project to create a bridge between scientists, local population in Greenland and the general public

    Science.gov (United States)

    Bourgain, Pascaline

    2015-04-01

    Bridging Science and Society has now become a necessity for scientists to develop new partnerships with local communities and to raise the public interest for scientific activities. The French-Greenlandic educational project called "Angalasut" reflects this desire to create a bridge between science, local people and the general public. This program was set up on the 2012-2013 school year, as part of an international scientific program dedicated to study the interactions between the ocean and glaciers on the western coast of Greenland, in the Uummannaq fjord. Greenlandic and French school children were involved in educational activities, in classrooms and out on the field, associated with the scientific observations conducted in Greenland (glacier flow, ocean chemical composition and circulation, instrumentation...). In Greenland, the children had the opportunity to come on board the scientific sailing boat, and in France, several meetings were organized between the children and the scientists of the expedition. In the small village of Ikerasak, the children interviewed Elders about sea ice evolution in the area. These activities, coupled to the organization of public conferences and to the creation of a trilingual website of the project (French, Greenlandic, English) aimed at explaining why scientists come to study Greenland environment. This was the opportunity for scientists to discuss with villagers who could testify on their changing environment over the past decades. A first step toward a future collaboration between scientists and villagers that would deserve further development... The project Angalasut was also the opportunity for Greenlandic and French school children to exchange about their culture and their environment through Skype communications, the exchange of mails (drawings, shells...), the creation of a society game about European fauna and flora... A meeting in France between the two groups of children is considered, possibly in summer 2015

  16. Steady-state sulfur critical loads and exceedances for protection of aquatic ecosystems in the U.S. Southern Appalachian Mountains.

    Science.gov (United States)

    McDonnell, Todd C; Sullivan, Timothy J; Hessburg, Paul F; Reynolds, Keith M; Povak, Nicholas A; Cosby, Bernard J; Jackson, William; Salter, R Brion

    2014-12-15

    Atmospherically deposited sulfur (S) causes stream water acidification throughout the eastern U.S. Southern Appalachian Mountain (SAM) region. Acidification has been linked with reduced fitness and richness of aquatic species and changes to benthic communities. Maintaining acid-base chemistry that supports native biota depends largely on balancing acidic deposition with the natural resupply of base cations. Stream water acid neutralizing capacity (ANC) is maintained by base cations that mostly originate from weathering of surrounding lithologies. When ambient atmospheric S deposition exceeds the critical load (CL) an ecosystem can tolerate, stream water chemistry may become lethal to biota. This work links statistical predictions of ANC and base cation weathering for streams and watersheds of the SAM region with a steady-state model to estimate CLs and exceedances. Results showed that 20.1% of the total length of study region streams displayed ANC high elevation, and cool and moist forested conditions, the percentage of stream length in exceedance was highest for mountain wilderness areas and in national parks, and lowest for privately owned valley bottom land. Exceedance results were summarized by 12-digit hydrologic unit code (subwatershed) for use in developing management goals and policy objectives, and for long-term monitoring. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Via generalized function projective synchronization in nonlinear Schrödinger equation for secure communication

    Science.gov (United States)

    Zhao, L. W.; Du, J. G.; Yin, J. L.

    2018-05-01

    This paper proposes a novel secured communication scheme in a chaotic system by applying generalized function projective synchronization of the nonlinear Schrödinger equation. This phenomenal approach guarantees a secured and convenient communication. Our study applied the Melnikov theorem with an active control strategy to suppress chaos in the system. The transmitted information signal is modulated into the parameter of the nonlinear Schrödinger equation in the transmitter and it is assumed that the parameter of the receiver system is unknown. Based on the Lyapunov stability theory and the adaptive control technique, the controllers are designed to make two identical nonlinear Schrödinger equation with the unknown parameter asymptotically synchronized. The numerical simulation results of our study confirmed the validity, effectiveness and the feasibility of the proposed novel synchronization method and error estimate for a secure communication. The Chaos masking signals of the information communication scheme, further guaranteed a safer and secured information communicated via this approach.

  18. General-purpose heat source project and space nuclear safety and fuels program. Progress report

    International Nuclear Information System (INIS)

    Maraman, W.J.

    1980-02-01

    Studies related to the use of 238 PuO 2 in radioisotopic power systems carried out for the Advanced Nuclear Systems and Projects Division of LASL are presented. The three programs involved are: general-purpose heat source development; space nuclear safety; and fuels program. Three impact tests were conducted to evaluate the effects of a high temperature reentry pulse and the use of CBCF on impact performance. Additionally, two 238 PuO 2 pellets were encapsulated in Ir-0.3% W for impact testing. Results of the clad development test and vent testing are noted. Results of the environmental tests are summarized. Progress on the Stirling isotope power systems test and the status of the improved MHW tests are indicated. The examination of the impact failure of the iridium shell of MHFT-65 at a fuel pass-through continued. A test plan was written for vibration testing of the assembled light-weight radioisotopic heater unit. Progress on fuel processing is reported

  19. The use of particle accelerators for space projects

    International Nuclear Information System (INIS)

    Virtanen, Ari

    2006-01-01

    With the introduction of CMOS technology radiation effects in components became an important issue in satellite and space mission projects. At the end of the cold war, the market of radiation hard (RadHard) components crashed and during the 90's their fabrication practically stopped. The use of 'commercial-off-the-shelf' (COTS) components became more common but required increased evaluation activities at radiation test sites. Component manufacturers and space project engineers were directed towards these test sites, in particular, towards particle accelerators. Many accelerator laboratories developed special beam lines and constructed dedicated test areas for component evaluations. The space environment was simulated at these test sites and components were tested to levels often exceeding mission requirements. In general, space projects environments were predicted in respects to particle mass and energy distributions with the expected fluxes and fluences. In order to validate this information in tests, concepts like stopping power, linear energy transfer, ion penetration ranges etc. have to be understood. The knowledge from the component structure also defines the way of irradiation. For example, the higher ion energies resulting in much deeper ion penetration ranges allow successful reverse side irradiation of thinned Integrated Circuits (ICs). So overall increased demands for radiation testing attracted the European Space Agency (ESA) to the JYFL-accelerator laboratory of the University of Jyvaeskylae, Finland. A contract was signed between ESA and JYFL for the development of a 'High Penetrating Heavy Ion Test Site'. Following one year development, this test site was commissioned in May 2005. This paper addresses the various issues around the JYFL laboratory with its accelerator and radiation effects facility as the focal point in service of component evaluations for the space community

  20. Generalized Born-Infeld actions and projective cubic curves

    Energy Technology Data Exchange (ETDEWEB)

    Ferrara, S. [Department of Physics, CERN Theory Division, CH - 1211 Geneva 23 (Switzerland); INFN - Laboratori Nazionali di Frascati, Via Enrico Fermi 40, I-00044, Frascati (Italy); Porrati, M. [CCPP, Department of Physics, NYU, 4 Washington Pl., New York, NY, 10003 (United States); Sagnotti, A. [Department of Physics, CERN Theory Division, CH - 1211 Geneva 23 (Switzerland); Stora, R. [Department of Physics, CERN Theory Division, CH - 1211 Geneva 23 (Switzerland); Laboratoire d' Annecy-le-Vieux de Physique Theorique (LAPTH), F-74941, Annecy-le-Vieux, Cedex (France); Yeranyan, A. [INFN - Laboratori Nazionali di Frascati, Via Enrico Fermi 40, I-00044, Frascati (Italy); Centro Studi e Ricerche Enrico Fermi, Via Panisperna 89A, 00184, Roma (Italy)

    2015-04-01

    We investigate U(1){sup n} supersymmetric Born-Infeld Lagrangians with a second non-linearly realized supersymmetry. The resulting non-linear structure is more complex than the square root present in the standard Born-Infeld action, and nonetheless the quadratic constraints determining these models can be solved exactly in all cases containing three vector multiplets. The corresponding models are classified by cubic holomorphic prepotentials. Their symmetry structures are associated to projective cubic varieties. (copyright 2015 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  1. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  2. A modified variable-coefficient projective Riccati equation method and its application to (2 + 1)-dimensional simplified generalized Broer-Kaup system

    International Nuclear Information System (INIS)

    Liu Qing; Zhu Jiamin; Hong Bihai

    2008-01-01

    A modified variable-coefficient projective Riccati equation method is proposed and applied to a (2 + 1)-dimensional simplified and generalized Broer-Kaup system. It is shown that the method presented by Huang and Zhang [Huang DJ, Zhang HQ. Chaos, Solitons and Fractals 2005; 23:601] is a special case of our method. The results obtained in the paper include many new formal solutions besides the all solutions found by Huang and Zhang

  3. Naesliden project: FEM modelling strategies

    Energy Technology Data Exchange (ETDEWEB)

    Borg, T.

    1980-05-15

    A schematized description is given of the different stages in the project. The aim is to show the development of the project and the strategies which have been chosen. The four different stages in the project are treated from the following points of view: the reasons for the choice of material models; the determination of model properties; and the control of the calculated values. In the origin plan for the project it was stated to only use a joint element model. However, it was shown to be a reasonable strategy to use both a general linear elastic model and a geometric restricted model with joint elements. During the course of the Project's development stages, it was found that a reduction in the number of rock types could be made without loss of generality. A modified strategy is suggested based on more studies of the rock bahavior and less advanced calculations in the first stages of the project.

  4. Loves Park Creek, Loves Park, Illinois Local Flood Protection. General Design Memorandum with Environmental Assessment. Revision

    Science.gov (United States)

    1990-06-01

    accelssCo, ~~e 61:6 ififectrica/ ca ndul’ -Aaq Accas hatch tSelf _____,?q ’EL /4s0 ~~~~~~~c ~ ~ ~ ~ s c) Q a~ri ty 5 iate I i q’ ,mfi AI r IIAcce ss shai...Goverment Audit F-il Article XIII - Federal and State Laws F-il Article XIV - Relationship of Parties F-il Article XV - Officials not to Benefit F-l1...shall not exceed the actual audited , allowable costs of Pebble Creek Dam that are allocable to the Project, nor shall the credits exceed the value of the

  5. Global Project Management: Graduate Course

    National Research Council Canada - National Science Library

    Beranek, Thomas R

    2006-01-01

    ..., A. James Clark School of Engineering - Project Management Program. The course slides and suggested readings provide a general exploration of the nuances of doing projects globally as compared to domestically...

  6. General Motors LLC Final Project Report: Improving Energy Efficiency by Developing Components for Distributed Cooling and Heating Based on Thermal Comfort Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Bozeman, Jeffrey [General Motors LLC, Detroit, MI (United States); Chen, Kuo-Huey [General Motors LLC, Detroit, MI (United States)

    2014-12-09

    On November 3, 2009, General Motors (GM) accepted U.S. Department of Energy (DOE) Cooperative Agreement award number DE-EE0000014 from the National Energy Technology Laboratory (NETL). GM was selected to execute a three-year cost shared research and development project on Solid State Energy Conversion for Vehicular Heating, Ventilation & Air Conditioning (HVAC) and for Waste Heat Recovery.

  7. Sprays and Cartan projective connections

    Science.gov (United States)

    Saunders, D. J.

    2004-10-01

    Around 80 years ago, several authors (for instance H. Weyl, T.Y. Thomas, J. Douglas and J.H.C. Whitehead) studied the projective geometry of paths, using the methods of tensor calculus. The principal object of study was a spray, namely a homogeneous second-order differential equation, or more generally a projective equivalence class of sprays. At around the same time, E. Cartan studied the same topic from a different point of view, by imagining a projective space attached to a manifold, or, more generally, attached to a `manifold of elements'; the infinitesimal `glue' may be interpreted in modern language as a Cartan projective connection on a principal bundle. This paper describes the geometrical relationship between these two points of view.

  8. Recycling of fresh concrete exceeding and wash water in concrete mixing plants

    Directory of Open Access Journals (Sweden)

    Férriz Papí, J. A.

    2014-03-01

    Full Text Available The exceeding concrete and washing equipment water are a matter to solve in concrete production. This paper explains several possibilities for recycling and analyses the products obtained with one recycling equipment. The objective of this work is to study the possibility to increase the percentage of recycling in new mixes. The developed study relates wash water density and fine particles content. Besides, mortar and concrete samples were tested introducing different quantities of these fine particles, substituting cement, sand or only as an addition. Consistency, compressive strength, setting time, absorption, and capillarity were tested. The results indicated an improvement of the studied properties in some percentages when substituting sand. It confirms the possibility to introduce larger quantities of wash water in new concrete mixes, with corrections in sand quantity depending on water density.Los hormigones frescos sobrantes y aguas procedentes de la limpieza de equipos son un inconveniente a resolver en las plantas de hormigón. Este artículo explica varias posibilidades de reciclado y analiza los productos obtenidos en un equipo reciclador concreto, con el objetivo de estudiar el incremento del porcentaje de reciclaje en nuevas amasadas. El estudio realizado relaciona la densidad del agua de lavado y el contenido de partículas finas. Además, ensaya muestras de mortero y hormigón realizando sustituciones de estas partículas finas por cemento, arena o simplemente como adición. Determina consistencia, resistencia a compresión, principio y fin de fraguado, absorción y capilaridad. Los resultados indicaron un incremento general de las propiedades estudiadas en algunos porcentajes de sustitución por arena. Ello confirma la posibilidad de introducir mayores cantidades de agua de lavado en nuevas amasadas de hormigón, mediante correcciones en la dosificación de arena en función de la densidad del agua.

  9. Generalized quasi variational inequalities

    Energy Technology Data Exchange (ETDEWEB)

    Noor, M.A. [King Saud Univ., Riyadh (Saudi Arabia)

    1996-12-31

    In this paper, we establish the equivalence between the generalized quasi variational inequalities and the generalized implicit Wiener-Hopf equations using essentially the projection technique. This equivalence is used to suggest and analyze a number of new iterative algorithms for solving generalized quasi variational inequalities and the related complementarity problems. The convergence criteria is also considered. The results proved in this paper represent a significant improvement and refinement of the previously known results.

  10. A generalized public goods game with coupling of individual ability and project benefit

    Science.gov (United States)

    Zhong, Li-Xin; Xu, Wen-Juan; He, Yun-Xin; Zhong, Chen-Yang; Chen, Rong-Da; Qiu, Tian; Shi, Yong-Dong; Ren, Fei

    2017-08-01

    Facing a heavy task, any single person can only make a limited contribution and team cooperation is needed. As one enjoys the benefit of the public goods, the potential benefits of the project are not always maximized and may be partly wasted. By incorporating individual ability and project benefit into the original public goods game, we study the coupling effect of the four parameters, the upper limit of individual contribution, the upper limit of individual benefit, the needed project cost and the upper limit of project benefit on the evolution of cooperation. Coevolving with the individual-level group size preferences, an increase in the upper limit of individual benefit promotes cooperation while an increase in the upper limit of individual contribution inhibits cooperation. The coupling of the upper limit of individual contribution and the needed project cost determines the critical point of the upper limit of project benefit, where the equilibrium frequency of cooperators reaches its highest level. Above the critical point, an increase in the upper limit of project benefit inhibits cooperation. The evolution of cooperation is closely related to the preferred group-size distribution. A functional relation between the frequency of cooperators and the dominant group size is found.

  11. Life Cycle Energy Analysis of Reclaimed Water Reuse Projects in Beijing.

    Science.gov (United States)

    Fan, Yupeng; Guo, Erhui; Zhai, Yuanzheng; Chang, Andrew C; Qiao, Qi; Kang, Peng

    2018-01-01

      To illustrate the benefits of water reuse project, the process-based life cycle analysis (LCA) could be combined with input-output LCA to evaluate the water reuse project. Energy is the only evaluation parameter used in this study. Life cycle assessment of all energy inputs (LCEA) is completed mainly by the life cycle inventory (LCI), taking into account the full life cycle including the construction, the operation, and the demolition phase of the project. Assessment of benefit from water reuse during the life cycle should focus on wastewater discharge reduction and water-saving benefits. The results of LCEA of Beijing water reuse project built in 2014 in a comprehensive way shows that the benefits obtained from the reclaimed water reuse far exceed the life cycle energy consumption. In this paper, the authors apply the LCEA model to estimate the benefits of reclaimed water reuse projects quantitatively.

  12. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  13. Ozone and its projection in regard to climate change

    Science.gov (United States)

    Melkonyan, Ani; Wagner, Patrick

    2013-03-01

    In this paper, the dependence of ozone-forming potential on temperature was analysed based on data from two stations (with an industrial and rural background, respectively) in North Rhine-Westphalia, Germany, for the period of 1983-2007. After examining the interrelations between ozone, NOx and temperature, a projection of the days with ozone exceedance (over a limit value of a daily maximum 8-h average ≥ 120 μg m-3 for 25 days per year averaged for 3 years) in terms of global climate change was made using probability theory and an autoregression integrated moving average (ARIMA) model. The results show that with a temperature increase of 3 K, the frequency of days when ozone exceeds its limit value will increase by 135% at the industrial station and by 87% at the rural background station.

  14. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  15. Statistical modeling of CMIP5 projected changes in extreme wet spells over China in the late 21st century

    Science.gov (United States)

    Zhu, Lianhua; Li, Yun; Jiang, Zhihong

    2017-08-01

    The observed intensity, frequency, and duration (IFD) of summer wet spells, defined here as extreme events with one or more consecutive days in which daily precipitation exceeds a given threshold (the 95th percentile), and their future changes in RCP4.5 and RCP8.5 in the late 21st century over China, are investigated by using the wet spell model (WSM) and by extending the point process approach to extreme value analysis. Wet spell intensity is modeled by a conditional generalized Pareto distribution, frequency by a Poisson distribution, and duration by a geometric distribution, respectively. The WSM is able to realistically model summer extreme rainfall spells during 1961-2005, as verified with observations at 553 stations throughout China. To minimize the impact of systematic biases over China in the global climate models (GCMs) of the Coupled Model Intercomparison Project Phase 5 (CMIP5), five best GCMs are selected based on their performance to reproduce observed wet spell IFD and average precipitation during the historical period. Furthermore, a quantile-quantile scaling correction procedure is proposed and applied to produce ensemble projections of wet spell IFD and corresponding probability distributions. The results show that in the late 21st century, most of China will experience more extreme rainfall and less low-intensity rainfall. The intensity and frequency of wet spells are projected to increase considerably, while the duration of wet spells will increase but to a much less extent. The IFD changes in RCP8.5 are in general much larger than those in RCP4.5.

  16. Angular momentum projected wave-functions

    International Nuclear Information System (INIS)

    Bengtsson, R.; Haakansson, H.B.

    1978-01-01

    Angular momentum projection has become a vital link between intrinsic model-wavefunctions and the physical states one intends to describe. We discuss in general terms some aspects of angular momentum projection and present results from projection on e.g. cranking wavefunctions. Mass densities and spectroscopic factors are also presented for some cases. (author)

  17. De Sitter projective relativity

    CERN Document Server

    Licata, Ignazio; Benedetto, Elmo

    2017-01-01

    This book presents the Projective approach to de Sitter Relativity. It traces the development of renewed interest in models of the universe at constant positive curvature such as "vacuum" geometry. The De Sitter Theory of Relativity, formulated in 1917 with Willem De Sitter's solution of the Einstein equations, was used in different fields during the 1950s and 1960s, in the work of H. Bacry, J.M. LevyLeblond and F.Gursey, to name some important contributors. From the 1960s to 1980s, L. Fantappié and G. Arcidiacono provided an elegant group approach to the De Sitter universe putting the basis for special and general projective relativity. Today such suggestions flow into a unitary scenario, and this way the De Sitter Relativity is no more a "missing opportunity" (F. Dyson, 1972), but has a central role in theoretical physics. In this volume a systematic presentation is given of the De Sitter Projective relativity, with the recent developments in projective general relativity and quantum cosmology.

  18. A problem of finding an acceptable variant in generalized project networks

    Directory of Open Access Journals (Sweden)

    David Blokh

    2005-01-01

    Full Text Available A project network often has some activities or groups of activities which can be performed at different stages of the project. Then, the problem of finding an optimal/acceptable time or/and optimal/acceptable order of such an activity or a group of activities arises. Such a problem emerges, in particular, in house-building management when the beginnings of some activities may vary in time or/and order. We consider a mathematical formulation of the problem, show its computational complexity, and describe an algorithm for solving the problem.

  19. Scaling of Precipitation Extremes Modelled by Generalized Pareto Distribution

    Science.gov (United States)

    Rajulapati, C. R.; Mujumdar, P. P.

    2017-12-01

    Precipitation extremes are often modelled with data from annual maximum series or peaks over threshold series. The Generalized Pareto Distribution (GPD) is commonly used to fit the peaks over threshold series. Scaling of precipitation extremes from larger time scales to smaller time scales when the extremes are modelled with the GPD is burdened with difficulties arising from varying thresholds for different durations. In this study, the scale invariance theory is used to develop a disaggregation model for precipitation extremes exceeding specified thresholds. A scaling relationship is developed for a range of thresholds obtained from a set of quantiles of non-zero precipitation of different durations. The GPD parameters and exceedance rate parameters are modelled by the Bayesian approach and the uncertainty in scaling exponent is quantified. A quantile based modification in the scaling relationship is proposed for obtaining the varying thresholds and exceedance rate parameters for shorter durations. The disaggregation model is applied to precipitation datasets of Berlin City, Germany and Bangalore City, India. From both the applications, it is observed that the uncertainty in the scaling exponent has a considerable effect on uncertainty in scaled parameters and return levels of shorter durations.

  20. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  1. Climate change impacts on projections of excess mortality at 2030 using spatially varying ozone-temperature risk surfaces.

    Science.gov (United States)

    Wilson, Ander; Reich, Brian J; Nolte, Christopher G; Spero, Tanya L; Hubbell, Bryan; Rappold, Ana G

    2017-01-01

    We project the change in ozone-related mortality burden attributable to changes in climate between a historical (1995-2005) and near-future (2025-2035) time period while incorporating a non-linear and synergistic effect of ozone and temperature on mortality. We simulate air quality from climate projections varying only biogenic emissions and holding anthropogenic emissions constant, thus attributing changes in ozone only to changes in climate and independent of changes in air pollutant emissions. We estimate non-linear, spatially varying, ozone-temperature risk surfaces for 94 US urban areas using observed data. Using the risk surfaces and climate projections we estimate daily mortality attributable to ozone exceeding 40 p.p.b. (moderate level) and 75 p.p.b. (US ozone NAAQS) for each time period. The average increases in city-specific median April-October ozone and temperature between time periods are 1.02 p.p.b. and 1.94 °F; however, the results varied by region. Increases in ozone because of climate change result in an increase in ozone mortality burden. Mortality attributed to ozone exceeding 40 p.p.b. increases by 7.7% (1.6-14.2%). Mortality attributed to ozone exceeding 75 p.p.b. increases by 14.2% (1.6 28.9%). The absolute increase in excess ozone mortality is larger for changes in moderate ozone levels, reflecting the larger number of days with moderate ozone levels.

  2. Automated metadata--final project report

    International Nuclear Information System (INIS)

    Schissel, David

    2016-01-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project's toolkit. Feedback was very positive on the project's toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  3. Conservation Science Fair Projects.

    Science.gov (United States)

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  4. PROJECTED PRECIPITATION CHANGES IN CENTRAL/EASTERN EUROPE ON THE BASIS OF ENSEMBLE SIMULATIONS

    Directory of Open Access Journals (Sweden)

    Erika Miklos

    2012-03-01

    Full Text Available Projected precipitation changes in Central/Eastern Europe on the basis of ENSEMBLE simulations. For building appropriate local/national adaptation and mitigation strategies, detailed analysis of regional climate change is essential. In order to estimate the climate change for the 21st century, both global and regional models may be used. However, due to the coarse horizontal resolution, global climate models are not appropriate to describe regional scale climate processes. On the other hand, regional climate models (RCMs provide more realistic regional climate scenarios. A wide range of RCM experiments was accomplished in the frame of the ENSEMBLES project funded by the EU FP6 program, which was one of the largest climate change research project ever completed. All the RCM experiments used 25 km horizontal resolution and the A1B emission scenario, according to which CO2 concentration by 2100 is estimated to exceed 700 ppm, i.e., more than twice of the preindustrial level.The 25 km spatial resolution is fine enough to estimate the future hydrology-related conditions in different parts of Europe, from which we separated and analyzed simulated climate data sets for the Central/Eastern European region. Precipitation is an especially important climatological variable because of agricultural aspects and flood-related natural hazards, which may seriously affect all the countries in the evaluated region. On the basis of our results, different RCM simulations generally project drier summers and wetter winters (compared to the recent decades. The southern countries are more likely to suffer more intense warming, especially, in summer, and also, more intense drought events due to the stronger Mediterranean impact.

  5. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  6. The Cumulative Daily Tolerance Levels of Potentially Toxic Excipients Ethanol and Propylene Glycol Are Commonly Exceeded in Neonates and Infants

    DEFF Research Database (Denmark)

    Valeur, Kristine Svinning; Hertel, Steen Axel; Lundstrøm, Kaare Engell

    2018-01-01

    neonates and infants and compare these levels to the tolerance limits found in guidelines published by European Medicines Agency (EMA). As part of the SEEN study, all medicinal products administered to neonates and infants were recorded. All included neonates received ≥2 medicinal products/day and infants...... ≥3 medicinal products/day. Daily excipient levels were calculated based on quantities obtained from manufacturers or databases. Excipient levels were compared to tolerance limits proposed by the EMA. Altogether, 470 neonates and 160 infants were included, recording 4207 prescriptions and 316 products...... exceed tolerance limit of 6 mg/kg/day. Of the total number of prescriptions involving PG-containing medicinal products (n = 174), 70% would alone exceed a maximum tolerance limit of 50 mg/kg/day. Maximal daily exposure to ethanol (1563 mg/kg/day) or PG (954 mg/kg/day) exceeded the tolerance limits...

  7. Water splitting-biosynthetic system with CO₂ reduction efficiencies exceeding photosynthesis.

    Science.gov (United States)

    Liu, Chong; Colón, Brendan C; Ziesack, Marika; Silver, Pamela A; Nocera, Daniel G

    2016-06-03

    Artificial photosynthetic systems can store solar energy and chemically reduce CO2 We developed a hybrid water splitting-biosynthetic system based on a biocompatible Earth-abundant inorganic catalyst system to split water into molecular hydrogen and oxygen (H2 and O2) at low driving voltages. When grown in contact with these catalysts, Ralstonia eutropha consumed the produced H2 to synthesize biomass and fuels or chemical products from low CO2 concentration in the presence of O2 This scalable system has a CO2 reduction energy efficiency of ~50% when producing bacterial biomass and liquid fusel alcohols, scrubbing 180 grams of CO2 per kilowatt-hour of electricity. Coupling this hybrid device to existing photovoltaic systems would yield a CO2 reduction energy efficiency of ~10%, exceeding that of natural photosynthetic systems. Copyright © 2016, American Association for the Advancement of Science.

  8. Four-Terminal All-Perovskite Tandem Solar Cells Achieving Power Conversion Efficiencies Exceeding 23%

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Kai [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhao, Dewei [University of Toledo; Wang, Changlei [University of Toledo; Wuhan University; Song, Zhaoning [University of Toledo; Yu, Yue [University of Toledo; Chen, Cong [University of Toledo; Zhao, Xingzhong [Wuhan University; Yan, Yanfa [University of Toledo

    2018-02-09

    We report on fabrication of 4-terminal all-perovskite tandem solar cells with power conversion efficiencies exceeding 23% by mechanically stacking semitransparent 1.75 eV wide-bandgap FA0.8Cs0.2Pb(I0.7Br0.3)3 perovskite top cells with 1.25 eV low-bandgap (FASnI3)0.6(MAPbI3)0.4 bottom cells. The top cells use MoOx/ITO transparent electrodes and achieve transmittance up to 70% beyond 700 nm.

  9. Accelerating transient drainage from UMTRA Project tailings piles

    International Nuclear Information System (INIS)

    1990-09-01

    The period between the completion of construction of the tailings disposal cell and the establishment of equilibrium moisture content and seepage conditions is considered to be the period of transient drainage. Transient drainage may be due to factors such as construction water, precipitation, or residual water from the milling process. Transient seepage rates usually exceed steady state seepage rates. If the transient seepage rate causes contaminant levels to exceed groundwater compliance standards, then an alternative groundwater compliance strategy or technical approach to reduce or mitigate the effects of the drainage must be adopted. This study examines methods to accelerate the transient drainage of soils and hence to remove excess pore water from tailings in UMTRA Project disposal cells. The technical and economic feasibility of possible methods is examined. In order to perform comparative economical analyses of the various methods, an example tailings pile is postulated. This pile is considered to be 300 meters by 300 meters by 10 meters in thickness

  10. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  11. Pointing the Way to the Future of Project Management: How the Past and Present Point Towards Project Management's Future

    National Research Council Canada - National Science Library

    Ballister, Robert

    2003-01-01

    .... The lessons learned from those projects, coupled with a look at project management history in general, will be checked against a current project management theory to determine if the focus of today's...

  12. Banach spaces with projectional skeletons

    Czech Academy of Sciences Publication Activity Database

    Kubiś, Wieslaw

    2009-01-01

    Roč. 350, č. 2 (2009), s. 758-776 ISSN 0022-247X Institutional research plan: CEZ:AV0Z10190503 Keywords : projection * projectional skeleton * norming set Subject RIV: BA - General Mathematics Impact factor: 1.225, year: 2009

  13. Essential Skills for Project Stakeholders Identification: Sustainability Perspective

    Directory of Open Access Journals (Sweden)

    Md. Mashiur Rahman

    2017-09-01

    Full Text Available In every life cycle of the project there are numerous people or organizations involved either directly or indirectly. While these type of people and organizations involved are called stakeholders and these may include the project team, client or customer, community, environment, suppliers, government. Stakeholders contribute and share their experiences, knowledge, and insights to support the project throughout its life cycle and therefore it is crucial to capture their input. However, before initiation of the project, stakeholders need to be identified. Following the fact that there are strategies and processes for stakeholder identification, it is not clear what skills are needed to employ those strategies for stakeholder identification. These skills are exceedingly important to have because in today's corporate world, the project team must be flexible in every aspect of their job and be able to complement their skills for the success of stakeholder identification. Using literature review, this paper seeks to describe the skills of project leader needed to identify the project team and the external stakeholders. Inductive approach was followed in this study and data was collected qualitatively using secondary sources. There are two essential skills i.e. relationship building skills and communication skills for internal stakeholders and four major skills i.e. communication skills, people skills, intellectual skills and conceptual skills for external stakeholders are identified for the identification of project stakeholders through literature review considering the sustainability issues in the project management.

  14. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  16. Identifying High Performance ERP Projects

    OpenAIRE

    Stensrud, Erik; Myrtveit, Ingunn

    2002-01-01

    Learning from high performance projects is crucial for software process improvement. Therefore, we need to identify outstanding projects that may serve as role models. It is common to measure productivity as an indicator of performance. It is vital that productivity measurements deal correctly with variable returns to scale and multivariate data. Software projects generally exhibit variable returns to scale, and the output from ERP projects is multivariate. We propose to use Data Envelopment ...

  17. Investigation of the possibility of exceeding the Greenwald density limit during ECRH in T-10

    International Nuclear Information System (INIS)

    Alikaev, V.V.; Borshchegovskii, A.A.; Volkov, V.V.; Dremin, M.M.; Esipchuk, Yu.V.; Kakurin, A.M.; Kirneva, N.A.; Kislov, A.Ya.; Kislov, D.A.; Klimanov, I.V.; Kochin, V.A.; Krupin, V.A.; Krylov, S.V.; Myalton, T.B.; Novikov, A.Yu.; Notkin, G.E.; Pavlov, Yu.D.; Piterskii, V.V.; Poznyak, V.I.; Roi, I.N.

    2000-01-01

    In T-10 experiments, attempts were made to significantly exceed the Greenwald limit n-bar Gr during high-power (P ab = 750 kW) electron-cyclotron resonance heating (ECRH) and gas puffing. Formally, the density limit (n-bar e ) lim exceeding the Greenwald limit ((n-bar) e ) lim /n-bar Gr = 1.8) was achieved for q L = 8.2. However, as q L decreased, the ratio (n-bar e ) lim /n-bar Gr also decreased, approaching unity at q L ≅ 3. It was suggested that the 'current radius' (i.e., the radius of the magnetic surface enclosing the bulk of the plasma current I p ), rather than the limiter radius, was the parameter governing the value of (n-bar e ) lim . In the ECRH experiments, no substantial degradation of plasma confinement was observed up to n-bar e ∼ 0.9(n-bar e ) lim regardless of the ratio (n(bar sign) e ) lim /n-bar Gr . In different scenarios of the density growth up to (n-bar e ) lim , two types of disruptions related to the density limit were observed

  18. How Agile Methods Inspire Project Management - The Half Double Initiative

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Svejvig, Per; Schlichter, Bjarne Rerup

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and are today highly implemented in practice. Observations of general project management practice show how it has been inspired by agile software development......, but very little research addresses the issue of agile project management. In order to understand and to provide suggestions for future practice on how agility can be incorporated in general project management, this paper provides an analysis which compares ten characteristics of agile software development...... (identified in theory) and the Half Double Methodology developed by the Danish Project Half Double initiative; a Methodology developed with practitioners and tested in seven Danish case companies. The analysis shows how the general project management to a great extent has been inspired by agile methods...

  19. Acceptable-doses exceeding in radionuclides transport

    International Nuclear Information System (INIS)

    Delabarre, P.

    2006-01-01

    Without any foregoing signal, the 12-gliding month dose in an employee of a radionuclides transporting firm raised to 44,30 mSv (over the double of the ICRP recommended yearly maximum of 20 mSv). Apart from immediate prohibition of any further professional exposure to ionising radiation for the employee concerned, and an inquiry for possible explanations concerning as well the employer as the employee, an in-depth investigation of the employees previous records took place. Except from the sudden rise, the investigation showed that the personal dosimeter was mostly presented for analysis weeks, even months, too late, what made any immediate action from occupational health and radioprotection side difficult and anyhow far too late. Investigation of the records of the other 30 employees showed that 1) mostly the dosimeters were not presented on the assumed date for analysis, but months to (sometimes) nearly one year late behind schedule 2) for the same job in the same period, registered doses varied from naught to over 8,00 mSv, depending on the employee 3) several employees had a 12-gliding months dose of over 10,00 mSv, even over 15,00 mSv During discussion with employee, employer, occupational physician and an agent of the qualified organisation for dosimeter analysis, the employer was anything but cooperative; the employee also was rather reluctant to answer questions, and given possible causes could not be corroborated. In an attempt to clarify the multiple problems, the Governmental Agency for Nuclear Control was involved, which imposed in a first time a( not very stringent, rather indulgent) action plan. Meanwhile, a written comment on the monthly dosimeter analyses was sent from as well the occupational physician as the analytical firm to the employer and to the concerned employees if a 12-gliding months dose exceeding 10 mSv was determined, without any reaction neither from the employer nor the employees. At the moment of the abstract submission (sept 05

  20. K3 projective models in scrolls

    CERN Document Server

    Johnsen, Trygve

    2004-01-01

    The exposition studies projective models of K3 surfaces whose hyperplane sections are non-Clifford general curves. These models are contained in rational normal scrolls. The exposition supplements standard descriptions of models of general K3 surfaces in projective spaces of low dimension, and leads to a classification of K3 surfaces in projective spaces of dimension at most 10. The authors bring further the ideas in Saint-Donat's classical article from 1974, lifting results from canonical curves to K3 surfaces and incorporating much of the Brill-Noether theory of curves and theory of syzygies developed in the mean time.

  1. Reconnaissance investigation of water quality, bottom sediment, and biota associated with irrigation drainage in the Vermejo Project area and the Maxwell National Wildlife Refuge, Colfax County, northeastern New Mexico, 1993

    Science.gov (United States)

    Bartolino, J.R.; Garrabrant, L.A.; Wilson, Mark; Lusk, J.D.

    1996-01-01

    Based on findings of limited studies during 1989-92, a reconnaissance investigation was conducted in 1993 to assess the effects of the Vermejo Irrigation Project on water quality in the area of the project, including the Maxwell National Wildlife Refuge. This project was part of a U.S. Department of the Interior National Irrigation Water-Quality Program to determine whether irrigation drainage has caused or has the potential to cause significant harmful effects on human health, fish, and wildlife and whether irrigation drainage may adversely affect the suitability of water for other beneficial uses. For this study, samples of water, sediment, and biota were collected from 16 sites in and around the Vermejo Irrigation Project prior to, during the latter part of, and after the 1993 irrigation season (April, August-September, and November, respectively). No inorganic constituents exceeded U.S. Environmental Protection Agency drinking-water standards. The State of New Mexico standard of 750 micrograms per liter for boron in irrigation water was exceeded at three sites (five samples), though none exceeded the livestock water standard of 5,000 micrograms per liter. Selenium concentrations exceeded the State of New Mexico chronic standard of 2 micrograms per liter for wildlife and fisheries water in at least eight samples from five sites. Bottom-sediment samples were collected and analyzed for trace elements and compared to concentrations of trace elements in soils of the Western United States. Concentrations of three trace elements at eight sites exceeded the upper values of the expected 95-percent ranges for Western U.S. soils. These included molybdenum at one site, selenium at seven sites, and uranium at four sites. Cadmium and copper concentrations exceeded the National Contaminant Biomonitoring Program 85th percentile in fish from six sites. Average concentrations of selenium in adult brine flies (33.7 mg/g dry weight) were elevated above concentrations in other

  2. Virtual Mockup test based on computational science and engineering. Near future technology projected by JSPS-RFTFADVENTURE project

    International Nuclear Information System (INIS)

    Yoshimura, Shinobu

    2001-01-01

    The ADVENTURE project began on August, 1997, as a project in the computational science' field of JSPS-RFTFADVENTURE project, and is progressed as five year project. In this project, by using versatile parallel computer environment such as PC cluster, super parallel computer, and so on , to solve an arbitrary shape of actual dynamical equation by using 10 to 100 million freedom class mode under maintaining a general use analytical capacity agreeable with present general use computational mechanics system, further development of a large-scale parallel computational mechanics system (ADVENTURE system) capable of carrying out an optimization design on shapes, physical properties, loading conditions, and so on is performed. Here was scoped, after outlining on background of R and D on ADVENTURE system and its features, on near future virtual mockup test forecast from it. (G.K.)

  3. Project management under uncertainty beyond beta: The generalized bicubic distribution

    Directory of Open Access Journals (Sweden)

    José García Pérez

    2016-01-01

    Full Text Available The beta distribution has traditionally been employed in the PERT methodology and generally used for modeling bounded continuous random variables based on expert’s judgment. The impossibility of estimating four parameters from the three values provided by the expert when the beta distribution is assumed to be the underlying distribution has been widely debated. This paper presents the generalized bicubic distribution as a good alternative to the beta distribution since, when the variance depends on the mode, the generalized bicubic distribution approximates the kurtosis of the Gaussian distribution better than the beta distribution. In addition, this distribution presents good properties in the PERT methodology in relation to moderation and conservatism criteria. Two empirical applications are presented to demonstrate the adequateness of this new distribution.

  4. Modeling environmental noise exceedances using non-homogeneous Poisson processes.

    Science.gov (United States)

    Guarnaccia, Claudio; Quartieri, Joseph; Barrios, Juan M; Rodrigues, Eliane R

    2014-10-01

    In this work a non-homogeneous Poisson model is considered to study noise exposure. The Poisson process, counting the number of times that a sound level surpasses a threshold, is used to estimate the probability that a population is exposed to high levels of noise a certain number of times in a given time interval. The rate function of the Poisson process is assumed to be of a Weibull type. The presented model is applied to community noise data from Messina, Sicily (Italy). Four sets of data are used to estimate the parameters involved in the model. After the estimation and tuning are made, a way of estimating the probability that an environmental noise threshold is exceeded a certain number of times in a given time interval is presented. This estimation can be very useful in the study of noise exposure of a population and also to predict, given the current behavior of the data, the probability of occurrence of high levels of noise in the near future. One of the most important features of the model is that it implicitly takes into account different noise sources, which need to be treated separately when using usual models.

  5. The Ukrainian pilot project “Stop radon”

    Directory of Open Access Journals (Sweden)

    Pavlenko Tatyana

    2014-01-01

    Full Text Available In 2010 one area of Ukraine (Kirovograd area was selected for a pilot project to reduce radon risks. The project consists of several stages: radon risk training for the public health professionals, measurements of radon concentration in schools and nurseries (more than 1000 buildings were examined, justifications of radon countermeasures and their implementation. The lognormal frequency distribution for equivalent equilibrium concentration was authentically established. The geometric mean of the indoor radon equivalent equilibrium concentration was established to 63 Bq/m3, and standard deviation is equal to 82 Bq/m3. The indoor radon equivalent equilibrium concentration ranged from 22 Bq/m3 to 809 Bq/m3. It was found that the national regulatory limit for this type of buildings was exceeded in more than 50% of the cases. The second phase of the project has a goal to remediate radon levels and reduce radon risks. Calculated exposure doses and radon risk were used to justify the remediation and assess the economic loss for the region caused by radon irradiation of the population.

  6. Upper Limit for Regional Sea Level Projections

    Science.gov (United States)

    Jevrejeva, Svetlana; Jackson, Luke; Riva, Riccardo; Grinsted, Aslak; Moore, John

    2016-04-01

    With more than 150 million people living within 1 m of high tide future sea level rise is one of the most damaging aspects of warming climate. The latest Intergovernmental Panel on Climate Change report (AR5 IPCC) noted that a 0.5 m rise in mean sea level will result in a dramatic increase the frequency of high water extremes - by an order of magnitude, or more in some regions. Thus the flood threat to the rapidly growing urban populations and associated infrastructure in coastal areas are major concerns for society. Hence, impact assessment, risk management, adaptation strategy and long-term decision making in coastal areas depend on projections of mean sea level and crucially its low probability, high impact, upper range. With probabilistic approach we produce regional sea level projections taking into account large uncertainties associated with Greenland and Antarctica ice sheets contribution. We calculate the upper limit (as 95%) for regional sea level projections by 2100 with RCP8.5 scenario, suggesting that for the most coastlines upper limit will exceed the global upper limit of 1.8 m.

  7. Antibiotic Prescription in Danish General Practice

    DEFF Research Database (Denmark)

    Sydenham, Rikke Vognbjerg; Plejdrup Hansen, Malene; Pedersen, Line Bjørnskov

    2016-01-01

    1. Background & Aim The overall aim of the project is to describe antibiotic consumption in Danish general practice with emphasis on specific types of antibiotics. The project will shed light on the impact of microbiological diagnostic methods (MDM) on the choice of antibiotic and the project...... will explore how the GPs prescription behaviour is influenced by selected factors. Antibiotics are essential when treating potentially lethal infections. An increasing development of resistant bacteria is considered one of the primary threats to public health. The majority of antibiotics (90%) are prescribed...... from general practice. The prescription of broad-spectrum antibiotics can cause unnecessary side effects for the individual and increases the risk of development of bacteria resistant to antibiotic treatment. Both the prescription of broad-spectrum antibiotics and the level of resistant bacteria...

  8. Knowledge capture and preservation at Cernavoda Unit 2 Project

    International Nuclear Information System (INIS)

    Condu, M.; Chirica, T.; Popescu, D.; Marculescu, N.

    2007-01-01

    Full text: As it is known, Cernavoda Unit 2 - Romania, is a delayed nuclear power plant (NPP), started in early '80s, works were frozen in 1990 and resumed in 2003 under a management contract concluded by Nuclearelectrica, the Romanian nuclear utility, with Atomic Energy of Canada Ltd (AECL)-Canada and Ansaldo - Italy. This project has many specificities, including long time stored equipment, some works done 15 to 20 years ago; technology developments during these years; only couple of staff available from those initially involved; and a forthcoming project (Cernavoda Units 3 and 4) in its latest development phase. On top of that, like in other Eastern European countries, Nuclearelectrica is losing people due to salary issue and 'brain drain'. In the actual international situation where the nuclear energy contribution to energy mix is under reconsideration and where the demand for qualified personnel significantly exceeds the offer, it is estimated that maybe the biggest challenge of the forthcoming Cernavoda Units 3 and 4 would be availability of human resources. As Cernavoda Unit 2 Project goes towards a successful completion, all those who put lots of efforts and a difficult to overestimate contribution to overcome all challenges of this special Project will leave one after the other. Special attention is being given by Nuclearelectrica and the main contractors AECL and Ansaldo capturing the knowledge (both explicit and tacit) accumulated in these last almost five years and to leave to those who will continue the forthcoming Unit 3 and 4 Projects and to the nuclear industry in general. The objective on knowledge capture and preservation is to gather all experience and lessons learned during contracting, financing, constructing and commissioning of NPP Cernavoda Unit 2, with a focus on tacit knowledge and to asses potential improvements that might be applied in the forthcoming projects, in order to improve nuclear and economic performance. There are couple of

  9. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  10. 7 CFR 1955.132 - Pilot projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Pilot projects. 1955.132 Section 1955.132 Agriculture... REGULATIONS (CONTINUED) PROPERTY MANAGEMENT Disposal of Inventory Property General § 1955.132 Pilot projects. FmHA or its successor agency under Public Law 103-354 may conduct pilot projects to test policies and...

  11. Bayesian projection of life expectancy accounting for the HIV/AIDS epidemic

    Directory of Open Access Journals (Sweden)

    Jessica Godwin

    2017-11-01

    Full Text Available Background: While probabilistic projection methods for projecting life expectancy exist, few account for covariates related to life expectancy. Generalized HIV/AIDS epidemics have a large, immediate negative impact on the life expectancy in a country, but this impact can be mitigated by widespread use of antiretroviral therapy (ART. Thus, projection methods for countries with generalized HIV/AIDS epidemics could be improved by accounting for HIV prevalence, the future course of the epidemic, and ART coverage. Methods: We extend the current Bayesian probabilistic life expectancy projection methods of Raftery et al. (2013 to account for HIV prevalence and adult ART coverage in countries with generalized HIV/AIDS epidemics. Results: We evaluate our method using out-of-sample validation. We find that the proposed method performs better than the method that does not account for HIV prevalence or ART coverage for projections of life expectancy in countries with a generalized epidemic, while projections for countries without an epidemic remain essentially unchanged. Conclusions: In general, our projections show rapid recovery to pre-epidemic life expectancy levels in the presence of widespread ART coverage. After the initial life expectancy recovery, we project a steady rise in life expectancy until the end of the century. Contribution: We develop a simple Bayesian hierarchical model for long-term projections of life expectancy while accounting for HIV/AIDS prevalence and coverage of ART. The method produces well-calibrated projections for countries with generalized HIV/AIDS epidemics up to 2100 while having limited data demands.

  12. Delivered volumes of enteral nutrition exceed prescribed volumes.

    Science.gov (United States)

    Walker, Renee Nichole; Utech, Anne; Velez, Maria Eugenia; Schwartz, Katie

    2014-10-01

    Enteral nutrition (EN) provisions are typically calculated based on a 24-hour infusion period. However, feedings are often interrupted for daily activities, procedures, or gastrointestinal intolerance. The study's objective was to determine the delivered EN quantities provided to stable hospitalized patients, using cellular time and measured volumes to verify our EN calculation adjustment. A supply of consecutively numbered ready-to-hang (RTH) EN product was delivered to the bedside of 26 inpatients with established EN tolerance at goal rates on various types of nursing units. The dietitian weighed the volume remaining in the infusing product and recorded the measurement time. On the following days, the dietitian continued to weigh the infusing RTH product and the empty RTH bottles saved by nursing. The primary outcome was the difference between the prescribed and delivered EN provisions, which was calculated with a paired t test. Patients received significantly more calories in the delivered enteral feeding (mean [SD], 1678 [385] kcal) than prescribed calories in the EN order (1489 [246 kcal]; t = 3.736, P = .001), adjusting for observed time. No significant differences were found between nursing units, product, and rate. EN delivered may actually exceed ordered amounts by 5%–21% (mean, 12%) with feeding pump inaccuracy as the primary contributing factor. This differs from what others have found. Our findings support using a volume-based ordering system vs a rate-based ordering system for more accurate EN delivery.

  13. The generalized hedgehog and the projected chiral soliton model

    International Nuclear Information System (INIS)

    Fiolhais, M.; Kernforschungsanlage Juelich G.m.b.H.; Goeke, K.; Bochum Univ.; Gruemmer, F.; Urbano, J.N.

    1988-01-01

    The linear chiral soliton model with quark fields and elementary pion and sigma fields is solved in order to describe static properties of the nucleon and the delta resonance. To this end a Fock state of the system is constructed which consists of three valence quarks in a 1s orbit with a generalized hedgehog spin-flavour configuration cosηvertical strokeu↓> - sin ηvertical stroked↑>. Coherent states are used to provide a quantum description for the mesonic parts of the total wave function. The corresponding classical pion field also exhibits a generalized hedgehog structure. Various nucleon properties are calculated. These include proton and neutron charge raii, and the mangnetic moment of the proton for which experiment is obtained. (orig./HSI)

  14. General concept and present status of the AMS - project

    International Nuclear Information System (INIS)

    Stan-Sion, C.; Plostinaru, D.; Catana, L.; Radulescu, M.; Marinescu, L.; Dima, R.

    1998-01-01

    The Institute of Nuclear Physics and Engineering, IFIN-HH, Bucharest started in 1996 the Construction Project for an AMS facility in Bucharest. The Project is supported by the German-Romanian scientific cooperation project RUM-013-97. In the frame of this project, scientific research, construction activities of electronic and mechanical devices and activities for calibration and optimization were performed. The activities in this year are concentrated on experimental tests and optimization of the AMS analysis procedure and on improving the tandem acceleration and transmission capability. These are as follows: - construction and tests of a high current sputter source, with spherical ionizer and automatic many-sample changer. Experimental tests and measurements of emittance and beam profile; - construction of the Injector Platform; - construction and tests of a Bragg - charged particle detector; - calibration and optimization experiments of the AMS ensemble. The AMS facility is based on the 8 MV - FN tandem accelerator and has the following main components: the AMS ion injector, a Wien - velocity filter, a 60 angle bending magnet and the particle detection system. For heavy particle detection we constructed a Bragg ionization chamber. This should be used for standard AMS measurements. A specific part of the AMS facility represents the AMS injector deck. The main components are: the high current sputter source, the analyzing double focusing magnet, two optical systems, a four-slit beam defining system in front of the analyzing magnet and a four-slit aperture with remote controlled Faraday cup (for beam current integration of stable isotopes) after the magnet. Finally, the pre-acceleration tube (40 kV) connects the ensemble to the ground potential of the accelerator beam line. For AMS measurements, the sputter ion source is able to provide both high beam current and small beam emittance. These characteristics are necessary in order to achieve high analyzing

  15. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  16. Lake Darling Flood Control Project, Souris River, North Dakota. General Project Design.

    Science.gov (United States)

    1983-06-01

    difference between the air temperature measured at 10 feet and snow surface temperature. Td ’ - is the difference between dewpoint temperature measured at 10...to atmospheric conditions in the river reach between the outlet of the dam and the gage. f. Total dissolved solids ( TDS ) are generally considered to be...C c o o c a m m o i p - g - *tm-ett 41JI IhcaU ICI (U 4 ) flU)WwooQ- flJ ~rVlrnj M W Nfr- r- 0 r- M WMM - I# )-z .Lr n LZ n Lrr r 4r 111

  17. Visuals Matter! Designing and using effective visual representations to support project and portfolio decisions

    DEFF Research Database (Denmark)

    Geraldi, Joana; Arlt, Mario

    . They can help managers to be sharper and quicker, especially if visuals are used in a mindful manner. The intent of this book is to increase the awareness of project, program and portfolio practitioners and scholars about the importance of visuals and to provide practical recommendations on how they can......This book is the result of a two-year research project, funded by Project Management Institute and University College London on data visualization in the project and portfolio management contexts. Visuals are powerful and constitute an integral part of analyzing problems and making decisions...... be used and designed mindfully. The research, which underpins this book, focuses on the impact of visuals on cognition of data in project portfolio decisions. The complexity of portfolio problems often exceed human cognitive limitations as a result of a number of factors, such as the large number...

  18. 32 CFR 310.51 - General.

    Science.gov (United States)

    2010-07-01

    ... PROGRAM Computer Matching Program Procedures § 310.51 General. (a) A computer matching program covers two... action against specific individuals. (2) Performed to support research or statistical projects...

  19. Automated metadata--final project report

    Energy Technology Data Exchange (ETDEWEB)

    Schissel, David [General Atomics, San Diego, CA (United States)

    2016-04-01

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO project was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.

  20. Utilization of low- and high-voltage electric equipment at heights exceeding 1000 m above sea level

    Energy Technology Data Exchange (ETDEWEB)

    Karapetyan, M.M.

    1980-01-01

    The present-day state of high- and low-voltage equipment utilization at heights exceeding 1000 m above sea level is considered with allowance for the technical requirements applicable to the equipment, as provided for in the GOST (All-Union State Standards), and for the results of scientific research studies. 12 refs.

  1. The Plasma Hearth Process Technology Development Project

    International Nuclear Information System (INIS)

    Geimer, R.; Batdorf, J.; Wolfe, P.

    1993-01-01

    The US DOE Office of Technology Development (OTD) is currently evaluating the Plasma Hearth Process (PHP) for potential treatment of several DOE waste types. The PHP is a high-temperature vitrification process that has potential application for a wide range of mixed waste types in both the low-level and transuranic mixed waste categories. The PHP is being tested under both the OTD Mixed Waste Integrated Program and the Buried Waste Integrated Demonstration. Initial testing has been completed on several different surrogate waste forms that are representative of some of the DOE mixed waste streams. Destruction of organic material exceeds that of conventional incineration technologies. The vitrified residual has leaching characteristics comparable to glass formulations produced in the high-level waste program. The first phase of the PHP demonstration project has been successfully completed, and the project is currently beginning a comprehensive second phase of development and testing

  2. Methods for estimating annual exceedance-probability discharges and largest recorded floods for unregulated streams in rural Missouri.

    Science.gov (United States)

    2014-01-01

    Regression analysis techniques were used to develop a : set of equations for rural ungaged stream sites for estimating : discharges with 50-, 20-, 10-, 4-, 2-, 1-, 0.5-, and 0.2-percent : annual exceedance probabilities, which are equivalent to : ann...

  3. Allocating risk capital for a brownfields redevelopment project under hydrogeological and financial uncertainty.

    Science.gov (United States)

    Yu, Soonyoung; Unger, Andre J A; Parker, Beth; Kim, Taehee

    2012-06-15

    In this study, we defined risk capital as the contingency fee or insurance premium that a brownfields redeveloper needs to set aside from the sale of each house in case they need to repurchase it at a later date because the indoor air has been detrimentally affected by subsurface contamination. The likelihood that indoor air concentrations will exceed a regulatory level subject to subsurface heterogeneity and source zone location uncertainty is simulated by a physics-based hydrogeological model using Monte Carlo realizations, yielding the probability of failure. The cost of failure is the future value of the house indexed to the stochastic US National Housing index. The risk capital is essentially the probability of failure times the cost of failure with a surcharge to compensate the developer against hydrogeological and financial uncertainty, with the surcharge acting as safety loading reflecting the developers' level of risk aversion. We review five methodologies taken from the actuarial and financial literature to price the risk capital for a highly stylized brownfield redevelopment project, with each method specifically adapted to accommodate our notion of the probability of failure. The objective of this paper is to develop an actuarially consistent approach for combining the hydrogeological and financial uncertainty into a contingency fee that the brownfields developer should reserve (i.e. the risk capital) in order to hedge their risk exposure during the project. Results indicate that the price of the risk capital is much more sensitive to hydrogeological rather than financial uncertainty. We use the Capital Asset Pricing Model to estimate the risk-adjusted discount rate to depreciate all costs to present value for the brownfield redevelopment project. A key outcome of this work is that the presentation of our risk capital valuation methodology is sufficiently generalized for application to a wide variety of engineering projects. Copyright © 2012 Elsevier

  4. Band Generalization of the Golub-Kahan Bidiagonalization, Generalized Jacobi Matrices, and the Core Problem

    Czech Academy of Sciences Publication Activity Database

    Hnětynková, Iveta; Plešinger, M.; Strakoš, Z.

    2015-01-01

    Roč. 36, č. 2 (2015), s. 417-434 ISSN 0895-4798 R&D Projects: GA ČR GA13-06684S Grant - others:GA MŠk(CZ) EE2.3.30.0065; GA MŠk(CZ) LL1202 Keywords : total least squares problem * multiple right-hand sides * core problem * Golub-Kahan bidiagonalization * generalized Jacobi matrices Subject RIV: BA - General Mathematics Impact factor: 1.883, year: 2015

  5. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  6. European Wind Farm Project Costs History and Projections 2008 Study

    Energy Technology Data Exchange (ETDEWEB)

    2008-10-15

    over which developers and financiers will be most focused over the development process. The concept of a power station for which the fuel is entirely free is attractive. However, this advantage is balanced by the variability of the wind which, to the uninitiated, may make an investment in such a scheme appear highly risky. In order to assess the energy production of a wind farm over the project life, it is necessary to determine accurately the long-term mean wind speed at a potential site. The prediction of energy production of a wind farm is dependent on many inputs for which the uncertainties can be objectively defined. This area therefore lends itself to a statistical assessment of the risks associated with a project. The wind analyst will review the uncertainties associated with the assessment and will obtain a 'standard deviation' for the analysis that can be applied to the central estimate. Based upon GH experience, where appropriate wind measurements have been made and diligently analysed and wind turbines with a good track record are used, it is likely that the 10-year 90% exceeding level (P90) for the wind farm production will be of the order of 10% to 15% below the central estimate (P50) of energy production for the wind farm. It is typical for an Operation and Management contract to be let to the turbine supplier for the duration of the defects liability period. Where the initial warranty period is only 2 years in term, the service period may extend to 5 years and cover unscheduled maintenance (repair) as well as routine servicing. Project Life Modern wind turbines are typically designed to be suitable for use within a specific envelope of climatic conditions over a 20 year design life. This lifetime assumption is generally supported by independent certification by a classification society such as Germanischer Lloyd or Det Norske Veritas, which has the primary purpose of ensuring that a design is compliant with specific safety requirements. Despite

  7. Hydropower projects financing through the public private partnership a future powered by hydro

    International Nuclear Information System (INIS)

    Oprea, Traian; Teleanu, Mihai; Dobrescu, Dan

    2004-01-01

    .5-4.0 GWh / 1 million Euro investment; - Debt report: equity set up at 80:20 % (one can prove an influence in price increase by 6-7 % if the report is fixed at 70:30 %); - Credit recovery period (debt) should not be lower than 12 years, with 3 years of grace period for construction, but 15 years for 'pay back' is recommendable; - The soft costs vs. hard costs report in the financial arrangement should be at most 25:75 %, but 15:85 is recommendable; - The loan interest should be fixed and not exceed LIBOR + 2 - 3 points; - ROE should not exceed 16-18 %; - A general contractor with experience in the hydro construction field and with solid bank guarantees ought to be hired for the EPC contract. Under these circumstances there one can finalize hydro projects through the project finance system. In order that the action of attracting private capital is successful, in any case it is primordial that it is strong support for behalf of the government to unfurl a public -private partnership project. The integral capitalization of the hydropower potential by building new hydroelectric plants - that implies in most of the cases as well as dam construction - represents on a long term for Romania both a condition of development and a prosperity source

  8. The Future of General Surgery: Evolving to Meet a Changing Practice.

    Science.gov (United States)

    Webber, Eric M; Ronson, Ashley R; Gorman, Lisa J; Taber, Sarah A; Harris, Kenneth A

    2016-01-01

    Similar to other countries, the practice of General Surgery in Canada has undergone significant evolution over the past 30 years without major changes to the training model. There is growing concern that current General Surgery residency training does not provide the skills required to practice the breadth of General Surgery in all Canadian communities and practice settings. Led by a national Task Force on the Future of General Surgery, this project aimed to develop recommendations on the optimal configuration of General Surgery training in Canada. A series of 4 evidence-based sub-studies and a national survey were launched to inform these recommendations. Generalized findings from the multiple methods of the project speak to the complexity of the current practice of General Surgery: (1) General surgeons have very different practice patterns depending on the location of practice; (2) General Surgery training offers strong preparation for overall clinical competence; (3) Subspecialized training is a new reality for today's general surgeons; and (4) Generation of the report and recommendations for the future of General Surgery. A total of 4 key recommendations were developed to optimize General Surgery for the 21st century. This project demonstrated that a high variability of practice dependent on location contrasts with the principles of implementing the same objectives of training for all General Surgery graduates. The overall results of the project have prompted the Royal College to review the training requirements and consider a more "fit for purpose" training scheme, thus ensuring that General Surgery residency training programs would optimally prepare residents for a broad range of practice settings and locations across Canada. Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.

  9. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  10. Successful community relations efforts at the Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    McKee, James E. Jr.; Meyer, Linda L.

    1992-01-01

    The Weldon Spring Site Remedial Action Project (WSSRAP) Community Relations Program involves many participants from the U.S. Department of Energy (DOE) and the Prime Management Contractor (PMC) composed of M.K. Ferguson and Jacobs Engineering. The proactive community relations plan exceeds the compliance requirements of NEPA and CERCLA and is coordinated by a three-person staff of professional communicators. The program permeates many of the operating decisions and the result has been public acceptance of the Project and its actions to date, which has been to conduct remedial actions that will place the site in a radiologically and chemically safe condition, eliminating potential hazards to the public and environment. (author)

  11. Hanford general employee training - A million dollar cost beneficial program

    International Nuclear Information System (INIS)

    Gardner, P.R.

    1991-02-01

    In January 1990, Westinghouse Hanford Company implemented an interactive videodisc training program entitled Hanford General Employee Training. Covering all Institute of Nuclear Power Operations general employee training objectives, training mandated by US Department of Energy orders, and training prescribed by internal Westinghouse Hanford Company policies, Hanford General Employee Training presents and manages engaging training programs individually tailored to each of the 9,000 employees. Development costs for a sophisticated program such as Hanford General Employee Training were high compared to similar costs for developing ''equivalent'' traditional training. Hardware ($500,000) and labor costs ($400,000) totaled $900,000. Annual maintenance costs, equipment plus labor, are totalling about $200,000. On the benefit side, by consolidating some 17 previous Westinghouse Hanford Company courses and more effectively managing the instructional process, Hanford General Employee Training reduced the average student training time from over 11 hours to just under 4 hours. For 9,000 employees, the computed net annual savings exceeds $1.3 million. 2 refs

  12. XXI century projections of wind-wave conditions and sea-level rise in the Black sea

    Science.gov (United States)

    Polonsky, A.; Garmashov, A.; Fomin, V.; Valchev, N.; Trifonova, E.

    2012-04-01

    Projection of regional climate changes for XXI century is one of the priorities of EC environmental programme. Potential worsening of the waves' statistics, sea level rise and extreme surges are the principal negative consequences of the climate change for marine environment. That is why the main purpose of this presentation is to discuss the above issue for the Black sea region (with a strong focus to the south-west subregion because the maximum heights of waves exceeding 10 m occur just here) using output of several global coupled models (GCM) for XXI century, wave simulation, long-term observations of sea level and statistical techniques. First of all we tried to choose the best coupled model (s) simulated the Black sea climate change and variability using the control experiments for 20 century (203). The principal result is as follows. There is not one model which is simulating adequately even one atmospheric parameter for all seasons. Therefore we considered (for the climate projection) different outputs form various models. When it was possible we calculated also the ensemble mean projection for the selected model (s) and emission scenarios. To calculate the wave projection we used the output of SWAN model forced by the GCM wind projection for 2010 to 2100. To estimate the sea level rise in XXI century and future surges statistics we extrapolate the observed sea level rise tendencies, statistical relation between wave heights and sea level and wave scenarios. Results show that in general, the climate change in XXI century doesn't lead to the catastrophic change of the Black sea wind-wave statistics including the extreme waves in the S-W Black sea. The typical atmospheric pattern leading to the intense storm in the S-W Black sea is characterized by the persistent anticyclonic area to the North of the Black sea and cyclonic conditions in the Southern Black sea region. Such pressure pattern causes persistent and strong eastern or north-eastern wind which

  13. 48 CFR 736.602-5 - Short selection process for procurements not to exceed the simplified acquisition threshold.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Short selection process for procurements not to exceed the simplified acquisition threshold. 736.602-5 Section 736.602-5... CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.602-5 Short...

  14. 48 CFR 636.602-5 - Short selection processes for contracts not to exceed the simplified acquisition threshold.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Short selection processes... ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 636.602-5 Short selection processes for contracts not to exceed the simplified acquisition threshold. The short selection process described in FAR 36...

  15. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  16. 7 CFR 3560.102 - Housing project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant documents...

  17. Spot volume exceeds 2 million lbs (again); restricted price hits $10/lb

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This article is the January 1995 uranium market summary. Volume on the spot concentrates market exceeded 2 million lbs equivalent for the second consecutive month. Six deals took place; four in the spot concentrates market, one in the conversion market, and one in the enrichment market. No deals took place in the medium or long-term market. The upper end of the restricted price range reached $10.00 per lb U3O8, its highest level since December 1993. The lower end of the restricted price range strengthened to $9.75. The lower end of the spot conversion price range strengthed to $5.70 per kg U, and SWU prices firmed to the $75.00 to $87.00 level

  18. Landlord project multi-year program plan, fiscal year 1999, WBS 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Dallas, M.D.

    1998-09-22

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste, electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.

  19. A Dynamic Multi-Projection-Contour Approximating Framework for the 3D Reconstruction of Buildings by Super-Generalized Optical Stereo-Pairs.

    Science.gov (United States)

    Yan, Yiming; Su, Nan; Zhao, Chunhui; Wang, Liguo

    2017-09-19

    In this paper, a novel framework of the 3D reconstruction of buildings is proposed, focusing on remote sensing super-generalized stereo-pairs (SGSPs). As we all know, 3D reconstruction cannot be well performed using nonstandard stereo pairs, since reliable stereo matching could not be achieved when the image-pairs are collected at a great difference of views, and we always failed to obtain dense 3D points for regions of buildings, and cannot do further 3D shape reconstruction. We defined SGSPs as two or more optical images collected in less constrained views but covering the same buildings. It is even more difficult to reconstruct the 3D shape of a building by SGSPs using traditional frameworks. As a result, a dynamic multi-projection-contour approximating (DMPCA) framework was introduced for SGSP-based 3D reconstruction. The key idea is that we do an optimization to find a group of parameters of a simulated 3D model and use a binary feature-image that minimizes the total differences between projection-contours of the building in the SGSPs and that in the simulated 3D model. Then, the simulated 3D model, defined by the group of parameters, could approximate the actual 3D shape of the building. Certain parameterized 3D basic-unit-models of typical buildings were designed, and a simulated projection system was established to obtain a simulated projection-contour in different views. Moreover, the artificial bee colony algorithm was employed to solve the optimization. With SGSPs collected by the satellite and our unmanned aerial vehicle, the DMPCA framework was verified by a group of experiments, which demonstrated the reliability and advantages of this work.

  20. The SMILING project

    DEFF Research Database (Denmark)

    Berger, Jacques; Blanchard, Gentiane; Ponce, Maiza Campos

    2013-01-01

    The "Sustainable Micronutrient Interventions to Control Deficiencies and Improve Nutritional Status and General Health in Asia" project (SMILING), funded by the European Commission, is a transnational collaboration of research institutions and implementation agencies in five Southeast Asian count...

  1. Temperature and humidity based projections of a rapid rise in global heat stress exposure during the 21st century

    Science.gov (United States)

    Coffel, Ethan D.; Horton, Radley M.; de Sherbinin, Alex

    2018-01-01

    As a result of global increases in both temperature and specific humidity, heat stress is projected to intensify throughout the 21st century. Some of the regions most susceptible to dangerous heat and humidity combinations are also among the most densely populated. Consequently, there is the potential for widespread exposure to wet bulb temperatures that approach and in some cases exceed postulated theoretical limits of human tolerance by mid- to late-century. We project that by 2080 the relative frequency of present-day extreme wet bulb temperature events could rise by a factor of 100-250 (approximately double the frequency change projected for temperature alone) in the tropics and parts of the mid-latitudes, areas which are projected to contain approximately half the world’s population. In addition, population exposure to wet bulb temperatures that exceed recent deadly heat waves may increase by a factor of five to ten, with 150-750 million person-days of exposure to wet bulb temperatures above those seen in today’s most severe heat waves by 2070-2080. Under RCP 8.5, exposure to wet bulb temperatures above 35 °C—the theoretical limit for human tolerance—could exceed a million person-days per year by 2080. Limiting emissions to follow RCP 4.5 entirely eliminates exposure to that extreme threshold. Some of the most affected regions, especially Northeast India and coastal West Africa, currently have scarce cooling infrastructure, relatively low adaptive capacity, and rapidly growing populations. In the coming decades heat stress may prove to be one of the most widely experienced and directly dangerous aspects of climate change, posing a severe threat to human health, energy infrastructure, and outdoor activities ranging from agricultural production to military training.

  2. Projecting Timber Inventory at the Product Level

    Science.gov (United States)

    Lawrence Teeter; Xiaoping Zhou

    1999-01-01

    Current timber inventory projections generally lack information on inventory by product classes. Most models available for inventory projection and linked to supply analyses are limited to projecting aggregate softwood and hardwood. The research presented describes a methodology for distributing the volume on each FIA (USDA Forest Service Forest Inventory and Analysis...

  3. INVESTMENTS VALUES AND EU FOUNDED PROJECTS

    Directory of Open Access Journals (Sweden)

    Salanta Irina Iulia

    2012-12-01

    Full Text Available Being value based is one of the principles project management has to respect in order to be sustainable. Values are guidelines for human behavior that are shared by a large group of individuals. As projects can be differentiated from investments, also projects’ values can be differentiated from investments’ values. Connecting projects with investments’ values contributes to projects’ success, to a sustainable project management process and to a sustainable investment. The article explains the differences between investments and projects and presents how the investment’s values can be related to the project. The topic is applicable when dealing with projects in general and can have benefic effects on investments initialized through projects financed by the European Union.

  4. The Stripa project. Annual report 1990

    International Nuclear Information System (INIS)

    1991-07-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The research and development division of the Swedish Nuclear Fuel and Waste Management Co. (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1990

  5. Catalog of Investment Projects in Bulgaria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-10-15

    This catalog includes information about 129 potential investment projects in Bulgaria and was developed by a team of experts from InvestBulgaria Agency in cooperation with municipalities and private companies. The document presents in brief general facts about the regions in Bulgaria. Projects are divided into the following categories: Tourism, Manufacturing, Urban Planning, Real Estate, Environment and renewable energy sources, Commerce, and Innovative and creative projects. The catalog provides detailed information about each project such as: status of the project, location, ownership, infrastructure, estimated value, contact information, etc.

  6. The Stripa project annual report 1991

    International Nuclear Information System (INIS)

    1992-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) has been entrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1991

  7. 48 CFR 836.602-5 - Short selection process for contracts not to exceed the simplified acquisition threshold.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Short selection process for contracts not to exceed the simplified acquisition threshold. 836.602-5 Section 836.602-5 Federal... AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 836.602-5 Short selection process for...

  8. How much Baltic salmon can be consumed without exceeding the tolerable safety limit ?

    Energy Technology Data Exchange (ETDEWEB)

    Kristiansen, H.R. [Mobile Nutrients Ltd. (Denmark)

    2004-09-15

    Because Baltic salmon is a top predator preying on sprat, herring and tobis, it is very vulnerable to contamination with dioxin and PCBs. The EU safety limit (SL) for fish is 4 picogram (pg) WHOTEQ g{sup -1} fresh fish. In April 2004, Danish commercial salmon fishing was banned to in the Baltic sea around Bornholm and Gotland (mainly ICES areas 25, 26), because the Food Administration reported dioxin levels exceeding the intervention level of 3 pg g{sup -1} fresh salmon. Their report was based on data from 10 individual salmon, and 3 pooled samples, each with 10 salmon. Since dioxins are widespread in the environment, the human population face a trade off to produce sufficient food that is safe to eat and avoid eating contaminated food. The world population is increasing, and the demand for healthy food is steadily increasing. Consequently, there is a need for risk assessments, where the consequences of eating foods with different grades of contamination is evaluated. The evaluation must be based on data of high quality, and because dioxin accumulation is a slow proces, the risk assessments should consider long time periods of months and years instead of days and weeks. The purpose of the present study is to evaluate the statistical variation of dioxin data from Baltic herring and salmon. The data are used to calculate the quantity of herring and salmon, that humans of different body weight can eat without exceeding the tolerable daily intake (TDI). (In dietary recommendations exposure from dairy products etc. must also be taken into account). A PCDD/F box model is proposed that subtract losses during cooking and postprandially.

  9. Project finance for alternative energy

    International Nuclear Information System (INIS)

    Mills, S.J.

    1993-01-01

    This paper is intended to provide general advice to sponsors of renewable energy projects who expect to raise project-based financing from commercial banks to fund the development of their projects. It will set out, for the benefit of such sponsors, how bankers typically approach the analysis of these undertakings and in particular the risk areas on which they concentrate. By doing so it should assist sponsors to maximise their prospects of raising bank finance. (author)

  10. Methods for estimating annual exceedance-probability streamflows for streams in Kansas based on data through water year 2015

    Science.gov (United States)

    Painter, Colin C.; Heimann, David C.; Lanning-Rush, Jennifer L.

    2017-08-14

    A study was done by the U.S. Geological Survey in cooperation with the Kansas Department of Transportation and the Federal Emergency Management Agency to develop regression models to estimate peak streamflows of annual exceedance probabilities of 50, 20, 10, 4, 2, 1, 0.5, and 0.2 percent at ungaged locations in Kansas. Peak streamflow frequency statistics from selected streamgages were related to contributing drainage area and average precipitation using generalized least-squares regression analysis. The peak streamflow statistics were derived from 151 streamgages with at least 25 years of streamflow data through 2015. The developed equations can be used to predict peak streamflow magnitude and frequency within two hydrologic regions that were defined based on the effects of irrigation. The equations developed in this report are applicable to streams in Kansas that are not substantially affected by regulation, surface-water diversions, or urbanization. The equations are intended for use for streams with contributing drainage areas ranging from 0.17 to 14,901 square miles in the nonirrigation effects region and, 1.02 to 3,555 square miles in the irrigation-affected region, corresponding to the range of drainage areas of the streamgages used in the development of the regional equations.

  11. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  12. A product of three projections

    Czech Academy of Sciences Publication Activity Database

    Kopecká, E.; Müller, Vladimír

    2014-01-01

    Roč. 223, č. 2 (2014), s. 175-186 ISSN 0039-3223 R&D Projects: GA ČR(CZ) GA14-07880S Institutional support: RVO:67985840 Keywords : Hilbert space * projection * extension Subject RIV: BA - General Mathematics Impact factor: 0.610, year: 2014 http://journals.impan.pl/cgi-bin/doi?sm223-2-4

  13. Digitizing geographic data with GRIDOT; a generalized program for drawing overlay grids in various map projections

    International Nuclear Information System (INIS)

    Edwards, R.G.; Durfee, R.C.

    1976-09-01

    The GRIDOT computer program draws overlay grids on a Calcomp plotter for use in digitizing information from maps, rectified aerial photographs, and other sources of spatially distributed data related to regional environmental problems. The options of the program facilitate use of the overlays with standard maps and map projections of the continental United States. The overlay grid may be defined as a latitude-longitude grid (geodetic grid), a Universal Transverse Mercator Grid, or one of the standard state-plane coordinate system grids. The map for which the overlay is intended may be in an Albers Equal Area projection, a Lambert Conformal projection, a Polyconic projection, a Transverse Mercator projection, a Universal Transverse Mercator projection, or any of the standard state-plane projections

  14. Exceedance of critical loads and of critical limits impacts tree nutrition across Europe

    DEFF Research Database (Denmark)

    Waldner, P.; Thimonier, A.; Graf Pannatier, E.

    2015-01-01

    solution tended to be related to less favourable nutritional status. Context Forests have been exposed to elevated atmospheric deposition of acidifying and eutrophying sulphur and nitrogen compounds for decades. Critical loads have been identified, below which damage due to acidification and eutrophication...... are not expected to occur. Aims We explored the relationship between the exceedance of critical loads and inorganic nitrogen concentration, the base cation to aluminium ratio in soil solutions, as well as the nutritional status of trees. Methods We used recent data describing deposition, elemental concentrations....... Conclusion The findings support the hypothesis that elevated nitrogen and sulphur deposition can lead to imbalances in tree nutrition....

  15. Arsenic and Antimony Removal from Drinking Water by Adsorptive Media - U.S. EPA Demonstration Project at South Truckee Meadows General Improvement District (STMGID), NV, Final Performance Evaluation Report

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the operation of an arsenic and antimony removal technology demonstrated at the South Truckee Meadows General Improvement District (STMGID) in Washoe County, NV. The objectives of the project wer...

  16. 48 CFR 436.602-5 - Short selection process for contracts not to exceed the simplified acquisition threshold.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Short selection process for contracts not to exceed the simplified acquisition threshold. 436.602-5 Section 436.602-5 Federal... ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.602-5 Short selection process for contracts not...

  17. A generalized construction of mirror manifolds

    International Nuclear Information System (INIS)

    Berglund, P.; Huebsch, T.

    1993-01-01

    We generalize the known method for explicit construction of mirror pairs of (2,2)-superconformal field theories, using the formalism of Landau-Ginzburg orbifolds. Geometrically, these theories are realized as Calabi-Yau hypersurfaces in weighted projective spaces. This generalization makes it possible to construct the mirror partners of many manifolds for which the mirror was not previously known. (orig.)

  18. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Gambrell, KP

    2002-01-11

    In 1995, the planning and building processes began to design and develop a mobile demonstration unit that could travel across the nation and be used as an effective outreach tool. In 1997, the unit was completed; and from June 1997 until December 2000, the Federal Highway Administration (FHWA)/Federal Motor Carrier Safety Administration (FMCSA) mobilized the Technology Truck, also known as Demonstration Project No. 111, ''Advanced Motor Carrier Operations and Safety Technologies.'' The project featured the latest available state-of-the-practice intelligent transportation systems (ITS) technologies designed to improve both the efficiency and safety of commercial vehicle operations (CVO). The Technology Truck was designed to inform and educate the motor carrier community and other stakeholders regarding ITS technologies, thus gaining support and buy-in for participation in the ITS program. The primary objective of the project was to demonstrate new and emerging ITS/CVO technologies and programs, showing their impact on motor carrier safety and productivity. In order to meet the objectives of the Technology Truck project, the FHWA/FMCSA formed public/private partnerships with industry and with Oak Ridge National Laboratory to demonstrate and display available ITS/CVO technologies in a cooperative effort. The mobile demonstration unit was showcased at national and regional conferences, symposiums, universities, truck shows and other venues, in an effort to reach as many potential users and decision makers as possible. By the end of the touring phase, the ITS/CVO Technology Truck had been demonstrated in 38 states, 4 Canadian provinces, 88 cities, and 114 events; been toured by 18,099 people; and traveled 115,233 miles. The market penetration for the Technology Truck exceeded 4,000,000, and the website received more than 25,000 hits. In addition to the Truck's visits, the portable ITS/CVO kiosk was demonstrated at 31 events in 23 cites in 15

  19. Generalized polygons

    CERN Document Server

    Maldeghem, Hendrik

    1998-01-01

    This book is intended to be an introduction to the fascinating theory ofgeneralized polygons for both the graduate student and the specialized researcher in the field. It gathers together a lot of basic properties (some of which are usually referred to in research papers as belonging to folklore) and very recent and sometimes deep results. I have chosen a fairly strict geometrical approach, which requires some knowledge of basic projective geometry. Yet, it enables one to prove some typically group-theoretical results such as the determination of the automorphism groups of certain Moufang polygons. As such, some basic group-theoretical knowledge is required of the reader. The notion of a generalized polygon is a relatively recent one. But it is one of the most important concepts in incidence geometry. Generalized polygons are the building bricks of Tits buildings. They are the prototypes and precursors of more general geometries such as partial geometries, partial quadrangles, semi-partial ge­ ometries, near...

  20. 2015 American College of Rheumatology Workforce Study: Supply and Demand Projections of Adult Rheumatology Workforce, 2015-2030.

    Science.gov (United States)

    Battafarano, Daniel F; Ditmyer, Marcia; Bolster, Marcy B; Fitzgerald, John D; Deal, Chad; Bass, Ann R; Molina, Rodolfo; Erickson, Alan R; Hausmann, Jonathan S; Klein-Gitelman, Marisa; Imundo, Lisa F; Smith, Benjamin J; Jones, Karla; Greene, Kamilah; Monrad, Seetha U

    2018-04-01

    To describe the character and composition of the 2015 US adult rheumatology workforce, evaluate workforce trends, and project supply and demand for clinical rheumatology care for 2015-2030. The 2015 Workforce Study of Rheumatology Specialists in the US used primary and secondary data sources to estimate the baseline adult rheumatology workforce and determine demographic and geographic factors relevant to workforce modeling. Supply and demand was projected through 2030, utilizing data-driven estimations regarding the proportion and clinical full-time equivalent (FTE) of academic versus nonacademic practitioners. The 2015 adult workforce (physicians, nurse practitioners, and physician assistants) was estimated to be 6,013 providers (5,415 clinical FTE). At baseline, the estimated demand exceeded the supply of clinical FTE by 700 (12.9%). By 2030, the supply of rheumatology clinical providers is projected to fall to 4,882 providers, or 4,051 clinical FTE (a 25.2% decrease in supply from 2015 baseline levels). Demand in 2030 is projected to exceed supply by 4,133 clinical FTE (102%). The adult rheumatology workforce projections reflect a major demographic and geographic shift that will significantly impact the supply of the future workforce by 2030. These shifts include baby-boomer retirements, a millennial predominance, and an increase of female and part-time providers, in parallel with an increased demand for adult rheumatology care due to the growing and aging US population. Regional and innovative strategies will be necessary to manage access to care and reduce barriers to care for rheumatology patients. © 2018, American College of Rheumatology.

  1. An Annotated List of New Social Studies Projects.

    Science.gov (United States)

    Knight, Merle M., Comp.

    The curriculum materials developed by 34 projects are described in this directory. The discussions are organized by discipline: Anthropology, Economics, Geography, History, Political Science, Social Psychology, Sociology, and General and Interdisciplinary. Each individual project note includes: project name, director, address, and a summary of the…

  2. Functional Generalized Structured Component Analysis.

    Science.gov (United States)

    Suk, Hye Won; Hwang, Heungsun

    2016-12-01

    An extension of Generalized Structured Component Analysis (GSCA), called Functional GSCA, is proposed to analyze functional data that are considered to arise from an underlying smooth curve varying over time or other continua. GSCA has been geared for the analysis of multivariate data. Accordingly, it cannot deal with functional data that often involve different measurement occasions across participants and a large number of measurement occasions that exceed the number of participants. Functional GSCA addresses these issues by integrating GSCA with spline basis function expansions that represent infinite-dimensional curves onto a finite-dimensional space. For parameter estimation, functional GSCA minimizes a penalized least squares criterion by using an alternating penalized least squares estimation algorithm. The usefulness of functional GSCA is illustrated with gait data.

  3. Major Events Coordinated Security Solutions: The Application of the Project Management Body of Knowledge for Managing a Science and Technology Project

    Science.gov (United States)

    2011-02-01

    represents the sum of knowledge related to project management and includes best practises and techniques generally accepted by the project...project has demonstrated that the principles of project management can be applied even to those activities that naturally resist the structure and...team and to engender trust in the output. DRDC believes strongly in the application of sound project management principles and uses an abbreviated

  4. General safety orientations of the Jules Horowitz Reactor Project (JHRP)

    International Nuclear Information System (INIS)

    Tremodeux, P.; Fiorini, G.L.

    2000-01-01

    After a brief reminder of the JHR purpose, the document outlines the General Safety related Orientations/Recommendations used for the design and the safety assessment of the facility. As far as the JHR design is new, the safety philosophy adopted for this reactor will be as consistent as possible with that recommended for future (power...) reactors. The general recommendations developed in the paper are: the general nuclear safety approach for the design, operation and analysis with, in particular, the adoption of the Defence In Depth principle; the general safety objectives in terms of radiological consequences; the use of Probabilistic Safety Studies; quality assurance. The 'Defence in Depth' concept using amongst others the 'Barrier' principle remains the basis of the JHR safety. 'Defence In Depth' is applied both to design and operation. Its adequacy is checked during the safety assessment and the paper gives the technical recommendations that should allow the designer to implement this concept into the final design. Built mainly for experimental irradiation the JHR facilities will be handled according to conventional or new operation rules which could put materials under stress and entail handling errors. Specific recommendations are defined to take into account the corresponding peculiarities; they are discussed in the paper. The safety design of the JHR takes into account the experience accumulated through the CEA experimental irradiation programmes, which represents several dozen reactor years; the consultation of CEA reactor facilities operators is ongoing. The corresponding feedback is shortly described. Recommendations related to maintenance and associated operation are indicated as well as those regarding the human factor. Details are given on the JHR safety practical implementation through the CEA/DRN Safety approach. Details of the corresponding Safety Objectives are also discussed. Finally the designer position on the role of probabilistic safety

  5. 7 CFR 1744.20 - General.

    Science.gov (United States)

    2010-01-01

    ... and Subordination Policy § 1744.20 General. (a) Recent changes in the telecommunications industry... and other organizations providing telecommunications services to consider undertaking projects that provide new telecommunications services and other telecommunications services not ordinarily financed by...

  6. The Stripa project. Annual report 1988

    International Nuclear Information System (INIS)

    1989-05-01

    The Stripa project is an international project being performed under the sponsorship of the OECD Nuclear Energy Agency (NEA). The project concerns research related to the disposal of highly radioactive waste in crystalline rock. The Research and Development Division of the Swedish Nuclear Fuel and Waste Management Company (SKB) hsa been enstrusted with the management of the project, under the direction of representatives from each participating country. The aim of this report is to inform the OECD Nuclear Energy Agency and the participants in the project about the general progress of work during 1988. (36 figs., 4 tabs.)

  7. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  8. A generally applicable lightweight method for calculating a value structure for tools and services in bioinformatics infrastructure projects.

    Science.gov (United States)

    Mayer, Gerhard; Quast, Christian; Felden, Janine; Lange, Matthias; Prinz, Manuel; Pühler, Alfred; Lawerenz, Chris; Scholz, Uwe; Glöckner, Frank Oliver; Müller, Wolfgang; Marcus, Katrin; Eisenacher, Martin

    2017-10-30

    Sustainable noncommercial bioinformatics infrastructures are a prerequisite to use and take advantage of the potential of big data analysis for research and economy. Consequently, funders, universities and institutes as well as users ask for a transparent value model for the tools and services offered. In this article, a generally applicable lightweight method is described by which bioinformatics infrastructure projects can estimate the value of tools and services offered without determining exactly the total costs of ownership. Five representative scenarios for value estimation from a rough estimation to a detailed breakdown of costs are presented. To account for the diversity in bioinformatics applications and services, the notion of service-specific 'service provision units' is introduced together with the factors influencing them and the main underlying assumptions for these 'value influencing factors'. Special attention is given on how to handle personnel costs and indirect costs such as electricity. Four examples are presented for the calculation of the value of tools and services provided by the German Network for Bioinformatics Infrastructure (de.NBI): one for tool usage, one for (Web-based) database analyses, one for consulting services and one for bioinformatics training events. Finally, from the discussed values, the costs of direct funding and the costs of payment of services by funded projects are calculated and compared. © The Author 2017. Published by Oxford University Press.

  9. Slang knowledge as an indicator of a general social deviancy subcultural factor.

    Science.gov (United States)

    Haertzen, C A; Ross, F E; Hooks, N T

    1979-06-01

    Evidence for a general social deviancy subcultural factor was found using the Kulik, Sarbin, and Stein (1971) slang test on drugs, gangs, law enforcement, and general words. The slang scores of 68 confirmed opiate addicts exceeded those of normals and young delinquents reported by Kulik, et al. (1971), including delinquents who were recidivists. Addicts knew more drug and alcohol slang than slang in the three other categories. It was recommended that more attempts should be made to subdivide measures of social deviancy by means of slang as there is some evidence of possible further differentiation of subcultural types by means of slang.

  10. A Multi-Class, Interdisciplinary Project Using Elementary Statistics

    Science.gov (United States)

    Reese, Margaret

    2012-01-01

    This article describes a multi-class project that employs statistical computing and writing in a statistics class. Three courses, General Ecology, Meteorology, and Introductory Statistics, cooperated on a project for the EPA's Student Design Competition. The continuing investigation has also spawned several undergraduate research projects in…

  11. 44 CFR 206.204 - Project performance.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project performance. 206.204... § 206.204 Project performance. (a) General. This section describes the policies and procedures applicable during the performance of eligible work. (b) Advances of funds. Advances of funds will be made in...

  12. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  13. Theory of Abelian projection

    International Nuclear Information System (INIS)

    Ogilvie, M.C.

    1999-01-01

    Analytic methods for Abelian projection are developed. A number of results are obtained related to string tension measurements. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The methods used emphasize that the projected theory is derived from the underlying non-Abelian theory rather than vice versa. In general, the choice of subgroup used for projection is not very important, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements. Two other issues, Casimir scaling and the conflict between projection and critical universality, are also discussed. copyright 1999 The American Physical Society

  14. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  15. Project finance for renewable energy

    International Nuclear Information System (INIS)

    Mills, S.J.; Taylor, M.

    1994-01-01

    This paper is intended to provide general advice to sponsors of renewable energy projects who expect to raise project-based financing from commercial banks to fund the development of their projects. It sets out, for the benefit of such sponsors, how bankers typically approach the analysis of these undertakings and in particular the risk areas on which they concentrate. By doing so it should assist sponsors to maximize their prospects of raising bank finance. The watchword for sponsors approaching banks must be ''Be Prepared'' . (author)

  16. General consideration of domestic participation in nuclear power projects

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    No nuclear power plant can be supplied entirely by outside sources. Some degree of domestic participation is always required and this can be increased if desired. There is no general rule as to what can and should be supplied locally; different countries have different characteristics, conditions and possibilities, and these define the scope of what is to be done. (orig./FW) [de

  17. Nonsynonymous substitution in abalone sperm fertilization genes exceeds substitution in introns and mitochondrial DNA

    Science.gov (United States)

    Metz, Edward C.; Robles-Sikisaka, Refugio; Vacquier, Victor D.

    1998-01-01

    Strong positive Darwinian selection acts on two sperm fertilization proteins, lysin and 18-kDa protein, from abalone (Haliotis). To understand the phylogenetic context for this dramatic molecular evolution, we obtained sequences of mitochondrial cytochrome c oxidase subunit I (mtCOI), and genomic sequences of lysin, 18-kDa, and a G protein subunit. Based on mtDNA differentiation, four north Pacific abalone species diverged within the past 2 million years (Myr), and remaining north Pacific species diverged over a period of 4–20 Myr. Between-species nonsynonymous differences in lysin and 18-kDa exons exceed nucleotide differences in introns by 3.5- to 24-fold. Remarkably, in some comparisons nonsynonymous substitutions in lysin and 18-kDa genes exceed synonymous substitutions in mtCOI. Lysin and 18-kDa intron/exon segments were sequenced from multiple red abalone individuals collected over a 1,200-km range. Only two nucleotide changes and two sites of slippage variation were detected in a total of >29,000 nucleotides surveyed. However, polymorphism in mtCOI and a G protein intron was found in this species. This finding suggests that positive selection swept one lysin allele and one 18-kDa allele to fixation. Similarities between mtCOI and lysin gene trees indicate that rapid adaptive evolution of lysin has occurred consistently through the history of the group. Comparisons with mtCOI molecular clock calibrations suggest that nonsynonymous substitutions accumulate 2–50 times faster in lysin and 18-kDa genes than in rapidly evolving mammalian genes. PMID:9724763

  18. Generalizing quasinormality

    Directory of Open Access Journals (Sweden)

    John Cossey

    2015-03-01

    Full Text Available Quasinormal subgroups have been studied for nearly 80 years. In finite groups, questions concerning them invariably reduce to p-groups, and here they have the added interest of being invariant under projectivities, unlike normal subgroups. However, it has been shown recently that certain groups, constructed by Berger and Gross in 1982, of an important universal nature with regard to the existence of core-free quasinormal subgroups gener- ally, have remarkably few such subgroups. Therefore in order to overcome this misfortune, a generalization of the concept of quasi- normality will be defined. It could be the beginning of a lengthy undertaking. But some of the initial findings are encouraging, in particular the fact that this larger class of subgroups also remains invariant under projectivities of finite p-groups, thus connecting group and subgroup lattice structures.

  19. Use of Generalized Fluid System Simulation Program (GFSSP) for Teaching and Performing Senior Design Projects at the Educational Institutions

    Science.gov (United States)

    Majumdar, A. K.; Hedayat, A.

    2015-01-01

    This paper describes the experience of the authors in using the Generalized Fluid System Simulation Program (GFSSP) in teaching Design of Thermal Systems class at University of Alabama in Huntsville. GFSSP is a finite volume based thermo-fluid system network analysis code, developed at NASA/Marshall Space Flight Center, and is extensively used in NASA, Department of Defense, and aerospace industries for propulsion system design, analysis, and performance evaluation. The educational version of GFSSP is freely available to all US higher education institutions. The main purpose of the paper is to illustrate the utilization of this user-friendly code for the thermal systems design and fluid engineering courses and to encourage the instructors to utilize the code for the class assignments as well as senior design projects.

  20. Notification: CIGIE Purchase Card Cross-Cutting Project

    Science.gov (United States)

    Project #OA-FY17-0088, December 20, 2016. The EPA OIG plans to participate in a Council of the Inspectors General on Integrity and Efficiency (CIGIE) purchase card cross-cutting project led by the U.S. Department of Agriculture OIG.

  1. A secure communication scheme based generalized function projective synchronization of a new 5D hyperchaotic system

    International Nuclear Information System (INIS)

    Wu, Xiangjun; Fu, Zhengye; Kurths, Jürgen

    2015-01-01

    In this paper, a new five-dimensional hyperchaotic system is proposed based on the Lü hyperchaotic system. Some of its basic dynamical properties, such as equilibria, Lyapunov exponents, bifurcations and various attractors are investigated. Furthermore, a new secure communication scheme based on generalized function projective synchronization (GFPS) of this hyperchaotic system with an uncertain parameter is presented. The communication scheme is composed of the modulation, the chaotic receiver, the chaotic transmitter and the demodulation. The modulation mechanism is to modulate the message signal into the system parameter. Then the chaotic signals are sent to the receiver via a public channel. In the receiver end, by designing the controllers and the parameter update rule, GFPS between the transmitter and receiver systems is achieved and the unknown parameter is estimated simultaneously. The message signal can be finally recovered by the identified parameter and the corresponding demodulation method. There is no any limitation on the message size. Numerical simulations are performed to show the validity and feasibility of the presented secure communication scheme. (paper)

  2. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    and gas drilling projects could help oil companies improve the performance of future drilling projects. Theoretically, the study's findings may help to bridge a gap in the project management CSFs literature, and add to the general project management body of knowledge.

  3. Nutrient intakes of US infants, toddlers, and preschoolers meet or exceed dietary reference intakes.

    Science.gov (United States)

    Butte, Nancy F; Fox, Mary Kay; Briefel, Ronette R; Siega-Riz, Anna Maria; Dwyer, Johanna T; Deming, Denise M; Reidy, Kathleen C

    2010-12-01

    To assess the usual nutrient intakes of 3,273 US infants, toddlers, and preschoolers, aged 0 to 47 months, surveyed in the Feeding Infants and Toddlers Study (FITS) 2008; and to compare data on the usual nutrient intakes for the two waves of FITS conducted in 2002 and 2008. The FITS 2008 is a cross-sectional survey of a national random sample of US children from birth through age 47 months. Usual nutrient intakes derived from foods, beverages, and supplements were ascertained using a telephone-administered, multiple-pass 24-hour dietary recall. Infants aged birth to 5 months (n=382) and 6 to 11 months (n=505), toddlers aged 12 to 23 months (n=925), and preschoolers aged 24 to 47 months (n=1,461) were surveyed. All primary caregivers completed one 24-hour dietary recall and a random subsample (n=701) completed a second 24-hour dietary recall. The personal computer version of the Software for Intake Distribution Estimation was used to estimate the 10th, 25th, 50th, 75th, and 90th percentiles, as well as the proportions below and above cutoff values defined by the Dietary Reference Intakes or the 2005 Dietary Guidelines for Americans. Usual nutrient intakes met or exceeded energy and protein requirements with minimal risk of vitamin and mineral deficiencies. The usual intakes of antioxidants, B vitamins, bone-related nutrients, and other micronutrients were adequate relative to the Adequate Intakes or Estimated Average Requirements, except for iron and zinc in a small subset of older infants, and vitamin E and potassium in toddlers and preschoolers. Intakes of synthetic folate, preformed vitamin A, zinc, and sodium exceeded Tolerable Upper Intake Level in a significant proportion of toddlers and preschoolers. Macronutrient distributions were within acceptable macronutrient distribution ranges, except for dietary fat, in some toddlers and preschoolers. Dietary fiber was low in the vast majority of toddlers and preschoolers, and saturated fat intakes exceeded

  4. Generalized Phase Contrast

    CERN Document Server

    Glückstad, Jesper

    2009-01-01

    Generalized Phase Contrast elevates the phase contrast technique not only to improve phase imaging but also to cross over and interface with diverse and seemingly disparate fields of contemporary optics and photonics. This book presents a comprehensive introduction to the Generalized Phase Contrast (GPC) method including an overview of the range of current and potential applications of GPC in wavefront sensing and phase imaging, structured laser illumination and image projection, optical trapping and manipulation, and optical encryption and decryption. The GPC method goes further than the restrictive assumptions of conventional Zernike phase contrast analysis and achieves an expanded range of validity beyond weak phase perturbations. The generalized analysis yields design criteria for tuning experimental parameters to achieve optimal performance in terms of accuracy, fidelity and light efficiency. Optimization can address practical issues, such as finding an optimal spatial filter for the chosen application, ...

  5. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  6. PSO Project 10085

    DEFF Research Database (Denmark)

    Jappe Frandsen, Flemming; Wu, Hao; Glarborg, Peter

    Co-combustion of refuse derived fuels (RDF) with coal in pulverized coal-fired power plants can potentially increase the electrical efficiency of utilizing RDF and reduce the formation of some harmful pollutants such as dioxins. The objective of this project was to provide a general assessment of...

  7. AI/Simulation Fusion Project at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Erickson, S.A.

    1984-01-01

    This presentation first discusses the motivation for the AI Simulation Fusion project. After discussing very briefly what expert systems are in general, what object oriented languages are in general, and some observed features of typical combat simulations, it discusses why putting together artificial intelligence and combat simulation makes sense. We then talk about the first demonstration goal for this fusion project

  8. AI/Simulation Fusion Project at Lawrence Livermore National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, S.A.

    1984-04-25

    This presentation first discusses the motivation for the AI Simulation Fusion project. After discussing very briefly what expert systems are in general, what object oriented languages are in general, and some observed features of typical combat simulations, it discusses why putting together artificial intelligence and combat simulation makes sense. We then talk about the first demonstration goal for this fusion project.

  9. Introducing an Innovative Project Management Framework for First Year Students – Project Work in a PBL Environment

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Møller, Michael Labovic

    2010-01-01

    Students at Aalborg University (AAU) in Denmark are educated according to the Aalborg Problem Based Learning (PBL) approach which entails working in groups and completing a project each semester. In accordance with this approach students are offered a course – Co-operation, Learning and Project...... in general acknowledge the benefits of thorough project plans and schedules, they often experience difficulties developing them and abiding by them. These experienced difficulties are caused by lack of motivation and competence within this particular area of project management. This paper describes how a new...

  10. Integrated management tool for controls software problems, requests and project tasking at SLAC

    International Nuclear Information System (INIS)

    Rogind, D.; Allen, W.; Colocho, W.; DeContreras, G.; Gordon, J.; Pandey, P.; Shoaee, H.

    2012-01-01

    The Accelerator Directorate (AD) Instrumentation and Controls (ICD) Software (SW) Department at SLAC, with its service center model, continuously receives engineering requests to design, build and support controls for accelerator systems lab-wide. Each customer request can vary in complexity from a small software engineering change to a major enhancement. SLAC's Accelerator Improvement Projects (AIPs), along with DOE Construction projects, also contribute heavily to the work load. The various customer requests and projects, paired with the ongoing operational maintenance and problem reports, place a demand on the department that consistently exceeds the capacity of available resources. A centralized repository - comprised of all requests, project tasks, and problems - available to physicists, operators, managers, and engineers alike, is essential to capture, communicate, prioritize, assign, schedule, track, and finally, commission all work components. The Software Department has recently integrated request / project tasking into SLAC's custom online problem tracking 'Comprehensive Accelerator Tool for Enhancing Reliability' (CATER) tool. This paper discusses the newly implemented software request management tool - the workload it helps to track, its structure, features, reports, work-flow and its many usages. (authors)

  11. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    International Nuclear Information System (INIS)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform

  12. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    Energy Technology Data Exchange (ETDEWEB)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform.

  13. Basic objects of marketing in project activities

    OpenAIRE

    Онищенко, Світлана Петрівна; Берневек, Тетяна Іванівна

    2013-01-01

    The article identified the main types of a project product from the point of view of a business level that is necessary to determine the specificity of the project marketing. As such objects of marketing - variants of the project product we have singled out: a product, a combination "product-market segment," a commodity group, a strategic business unit, a company. We have analyzed the relation "product life cycle - project-organization" and received a generalized representation of this relati...

  14. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Science.gov (United States)

    2010-07-01

    ... multidisciplinary, and emphasizes scientific methodology, and may involve collaboration among institutions. (3... Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the... EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the...

  15. Tiny Devices Project Sharp, Colorful Images

    Science.gov (United States)

    2009-01-01

    Displaytech Inc., based in Longmont, Colorado and recently acquired by Micron Technology Inc. of Boise, Idaho, first received a Small Business Innovation Research contract in 1993 from Johnson Space Center to develop tiny, electronic, color displays, called microdisplays. Displaytech has since sold over 20 million microdisplays and was ranked one of the fastest growing technology companies by Deloitte and Touche in 2005. Customers currently incorporate the microdisplays in tiny pico-projectors, which weigh only a few ounces and attach to media players, cell phones, and other devices. The projectors can convert a digital image from the typical postage stamp size into a bright, clear, four-foot projection. The company believes sales of this type of pico-projector may exceed $1.1 billion within 5 years.

  16. The analysis of projected fission track lengths

    International Nuclear Information System (INIS)

    Laslett, G.M.; Galbraith, R.F.; Green, P.F.

    1994-01-01

    This article deals with the question of how features of the thermal history can be estimated from projected track length measurements, i.e. lengths of the remaining parts of tracks that have intersected a surface, projected onto that surface. The appropriate mathematical theory is described and used to provide a sound basis both for understanding the nature of projected length measurements and for analysing observed data. The estimation of thermal history parameters corresponding to the current temperature, the maximum palaeotemperature and the time since cooling, is studied using laboratory data and simulations. In general the information contained in projected track lengths and angles is fairly limited, compared, for example, with that from a much smaller number of confined tracks, though we identify some circumstances when such measurements may be useful. Also it is not straightforward to extract the information and simple ad hoc estimation methods are generally inadequate. (author)

  17. The project scientist's role in scientific spacecraft project management. M.S. Thesis - George Washington Univ.

    Science.gov (United States)

    Eller, E. L.

    1976-01-01

    The project scientists is in a position which rates very high in terms of behavioral study recommendations. His influence over objectives is generally considered to be important. He is highly autonomous in a moderately coordinated environment. He has diverse managerial and technical functions and the performance of these functions require him to grow beyond his role as an experimenter. However, the position within the line organization for those interviewed is also very stimulating, rating almost as high by the same criteria. The role of project scientist may not be the dominant means of professional growth for the experienced scientific investigators. The influence which the project scientist exerts on the project and the stimulation of that position for him are determined largely by his position outside the defined project scientist role. The role of the project scientist is changing because the environment of those who become project scientists is changing.

  18. Towards e-Government project assessment: European approach

    Directory of Open Access Journals (Sweden)

    Pavel Mates

    2013-06-01

    Full Text Available The objective of the paper is to analyse current approaches to the assessment of e-Government projects as the specifi c public projects and to suggest how to improve these approaches in order to eliminate their shortcomings. The nonnormative theoretical methods are used to analyse empirical results of previous researches; particularly the deduction method is used to prove that current approaches to the evaluation of e-Government projects have some inequalities, the analogy and comparison methods are used to create general typology of e-Government projects and the induction method is used to seek examples of the indicators and metrics. The results are based on analysis of extensive amount of e-Government projects, which have been realized in different European countries in the past twenty years. The basic result of the research is creation of the ten most common types of e-Government projects typology. The fundamental conclusion obtained from the results of this research is that this typology can be used as the core of new E-Government General Assessment Framework, which eliminates problems of previous approaches, allows adjusting metrics and indicators to each type of projects, keeps comparability of results and thus making possible the use of benchmarking methods.

  19. Multi-model ensemble projections of European river floods and high flows at 1.5, 2, and 3 degree global warming

    Science.gov (United States)

    Thober, S.; Kumar, R.; Wanders, N.; Marx, A.; Pan, M.; Rakovec, O.; Samaniego, L. E.; Sheffield, J.; Wood, E. F.; Zink, M.

    2017-12-01

    Severe river floods often result in huge economic losses and fatalities. Since 1980, almost 1500 such events have been reported in Europe. This study investigates climate change impacts on European floods under 1.5, 2, and 3 K global warming. The impacts are assessed employing a multi-model ensemble containing three hydrologic models (HMs: mHM, Noah-MP, PCR-GLOBWB) forced by five CMIP5 General Circulation Models (GCMs) under three Representative Concentration Pathways (RCPs 2.6, 6.0, and 8.5). This multi-model ensemble is unprecedented with respect to the combination of its size (45 realisations) and its spatial resolution, which is 5 km over entire Europe. Climate change impacts are quantified for high flows and flood events, represented by 10% exceedance probability and annual maxima of daily streamflow, respectively. The multi-model ensemble points to the Mediterranean region as a hotspot of changes with significant decrements in high flows from -11% at 1.5 K up to -30% at 3 K global warming mainly resulting from reduced precipitation. Small changes (< ±10%) are observed for river basins in Central Europe and the British Isles under different levels of warming. Projected higher annual precipitation increases high flows in Scandinavia, but reduced snow water equivalent decreases flood events in this region. The contribution by the GCMs to the overall uncertainties of the ensemble is in general higher than that by the HMs. The latter, however, have a substantial share of the overall uncertainty and exceed GCM uncertainty in the Mediterranean and Scandinavia. Adaptation measures for limiting the impacts of global warming could be similar under 1.5 K and 2 K global warming, but has to account for significantly higher changes under 3 K global warming.

  20. General discussion of feasibility study

    International Nuclear Information System (INIS)

    Calori, F.

    1976-01-01

    Fundamentals, objectives and parameters of feasibility studies in the field of nuclear power project planning are discussed in a general way. Technical and economic problems to be considered are pointed out. In special cases, IAEA offers its aid and support. (UA) [de

  1. Amino acid production exceeds plant nitrogen demand in Siberian tundra

    Science.gov (United States)

    Wild, Birgit; Eloy Alves, Ricardo J.; Bárta, Jiři; Čapek, Petr; Gentsch, Norman; Guggenberger, Georg; Hugelius, Gustaf; Knoltsch, Anna; Kuhry, Peter; Lashchinskiy, Nikolay; Mikutta, Robert; Palmtag, Juri; Prommer, Judith; Schnecker, Jörg; Shibistova, Olga; Takriti, Mounir; Urich, Tim; Richter, Andreas

    2018-03-01

    Arctic plant productivity is often limited by low soil N availability. This has been attributed to slow breakdown of N-containing polymers in litter and soil organic matter (SOM) into smaller, available units, and to shallow plant rooting constrained by permafrost and high soil moisture. Using 15N pool dilution assays, we here quantified gross amino acid and ammonium production rates in 97 active layer samples from four sites across the Siberian Arctic. We found that amino acid production in organic layers alone exceeded literature-based estimates of maximum plant N uptake 17-fold and therefore reject the hypothesis that arctic plant N limitation results from slow SOM breakdown. High microbial N use efficiency in organic layers rather suggests strong competition of microorganisms and plants in the dominant rooting zone. Deeper horizons showed lower amino acid production rates per volume, but also lower microbial N use efficiency. Permafrost thaw together with soil drainage might facilitate deeper plant rooting and uptake of previously inaccessible subsoil N, and thereby promote plant productivity in arctic ecosystems. We conclude that changes in microbial decomposer activity, microbial N utilization and plant root density with soil depth interactively control N availability for plants in the Arctic.

  2. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  3. [Administration of the "Healthy School" project].

    Science.gov (United States)

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    The term of project management is commonly used to describe the work of a team that is handling a special program. In this type of management, a form of leadership which creates environment, enables fast movement of participants through different work phases achieving the common aims, is used [1-4]. The "Healthy School" Project, launched in almost all European countries, has been taking place in Yugoslavia since the end of 1991 [5]. The project developed within the country designed as a health promotion-education intervention study in primary schools. The network of 13 schools on 11 locations representing typical economic, cultural and social environments, was established to cover the country. Although the proposed methodological approach from WHO was followed [6], the specific situation in the country (economic crisis, break down of Yugoslav Federation, the war and international blockade) distated the particular modification. The management of the Healthy School Project in general, and in Yugoslavia particularly, is based upon project management structure (Scheme 1). The objective of this research was to assess the Healthy School project management in Yugoslavia, by measuring causal, intervening and output variables. In the process of assessing the management in general, three groups of criteria are commonly used: (a) causal (those that influence the course of developments in the Project), (b) intervening (representing the current condition of the internal state of the Project), and (c) output (that reflect the Project achievements). (a) For the purpose of this study the causal criteria were measured by analyzing the overall management strategy and the level of agreement in objectives of the Project itself, the Project Coordinators and main participants in the Project. (b) The intervening criteria used in this assessment were: the time spent on different project activities, the estimate of the severity of the problems in different aspects of project management

  4. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  5. Practice patterns among male and female general dentists in a Washington State population.

    Science.gov (United States)

    del Aguila, Michael A; Leggott, Penelope J; Robertson, Paul B; Porterfield, Denise L; Felber, Gene D

    2005-06-01

    Women make up about 14 percent of general dentists in the United States, and the proportion is projected to exceed 29 percent by 2020. The authors obtained dental benefits claims data from the Washington Dental Service (WDS), Seattle, and used them to examine the practice patterns of 265 women and 1,947 men engaged in general dentistry for at least 26 days in 2001. Practice variables of interest included age, days worked, procedures performed and total income from WDS reimbursements and patient copayments. The number, age and sex of patients treated also were obtained. Using productivity data, the authors also estimated the potential impact of an increase in the percentage of female dentists in the state. The authors found no differences between male and female dentists in the number of procedures per patient, income per patient or income per day of work. Frequency distributions of various services were highly similar for both groups. Multiple regression models showed no influence of dentist's sex on total income. However, the mean and median numbers of days worked were about 10 percent lower for female dentists than for male dentists. This difference was consistent with the finding that female dentists treated approximately 10 percent fewer patients, performed about 10 percent fewer procedures and had a combined income of about 10 percent less than that of male dentists. Practice patterns of male and female dentists generally were equivalent in this WDS population. Female and male dentists provided a similar range of services and earned an equal income per patient treated and per day worked. However, women worked fewer days per year than did men, irrespective of age. If the dental work force and practice patterns remain unchanged otherwise, the total number of patients treated per dentist will decrease slightly as women make up an increasing proportion of dentists.

  6. Computing generalized Langevin equations and generalized Fokker-Planck equations.

    Science.gov (United States)

    Darve, Eric; Solomon, Jose; Kia, Amirali

    2009-07-07

    The Mori-Zwanzig formalism is an effective tool to derive differential equations describing the evolution of a small number of resolved variables. In this paper we present its application to the derivation of generalized Langevin equations and generalized non-Markovian Fokker-Planck equations. We show how long time scales rates and metastable basins can be extracted from these equations. Numerical algorithms are proposed to discretize these equations. An important aspect is the numerical solution of the orthogonal dynamics equation which is a partial differential equation in a high dimensional space. We propose efficient numerical methods to solve this orthogonal dynamics equation. In addition, we present a projection formalism of the Mori-Zwanzig type that is applicable to discrete maps. Numerical applications are presented from the field of Hamiltonian systems.

  7. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  8. MYRRHA project: an Accelerator Driven System (ADS) Prototype

    International Nuclear Information System (INIS)

    Ait Abderrahim, H.

    2000-01-01

    The goal of the MYRRHA project is to investigate the design, development and realisation of a versatile neutron source based on an Accelerator Driven System (ADS). Efforts in 1999 were focussed on the optimisation of a high-performance device with a maximum neutron flux for MA irradiation experiments of 1.10 1 '5 n/cm 2 .s with neutron energies exceeding 0.75 MeV and about 3.10 15 n/cm 2 .s for all energies. Design proposals for different MYRRHA ADS components including the accelerator and the spallation source were elaborated. Potential applications of an ADS neutron source as well as various engineering aspects are discussed

  9. Generalized minimizers of convex integral functionals, Bregman distance, Pythagorean identities

    Czech Academy of Sciences Publication Activity Database

    Imre, C.; Matúš, František

    2012-01-01

    Roč. 48, č. 4 (2012), s. 637-689 ISSN 0023-5954 R&D Projects: GA ČR GA201/08/0539; GA ČR GAP202/10/0618 Institutional support: RVO:67985556 Keywords : maximum entropy * moment constraint * generalized primal/dual solutions * normal integrand * convex duality * Bregman projection * inference principles Subject RIV: BA - General Mathematics Impact factor: 0.619, year: 2012 http://library.utia.cas.cz/separaty/2012/MTR/matus-0381750.pdf

  10. Calculation of projected ranges

    International Nuclear Information System (INIS)

    Biersack, J.P.

    1980-09-01

    The concept of multiple scattering is reconsidered for obtaining the directional spreading of ion motion as a function of energy loss. From this the mean projection of each pathlength element of the ion trajectory is derived which - upon summation or integration - leads to the desired mean projected range. In special cases, the calculation can be carried out analytically, otherwise a simple general algorithm is derived which is suitable even for the smallest programmable calculators. Necessary input for the present treatment consists only of generally accessable stopping power and straggling formulas. The procedure does not rely on scattering cross sections, e.g. power potential or f(t 1 sup(/) 2 ) approximations. The present approach lends itself easily to include electronic straggling or to treat composed target materials, or even to account for the so-called time integral. (orig.)

  11. Composition and sources of particles in Mannerheimintie during exceedance days of PM{sub 10} limit value in 2009; Hiukkasten koostumus ja laehteet Mannerheimintiellae PM{sub 10}-raja-arvon ylityspaeivinae 2009

    Energy Technology Data Exchange (ETDEWEB)

    Kupiainen, K.; Stojiljkovic, A.; Ritola, R. (Nordic Envicon Oy, Helsinki (Finland))

    2011-06-15

    The purpose of the work was to determine sources of thoracic particles (PM{sub 10}) in the center of Helsinki, in Mannerheimintie, in 2009 during the days when the daily average concentration of PM{sub 10} exceeded 50 mug/m3. Work was commissioned by the Helsinki City Public Works department, the Helsinki Environment Centre and the Helsinki Region Environmental Services Authority HSY (formerly YTV). By the end of the year there were altogether 30 exceedance days. The allowed number of exceedance days per year is 35, so the limit value was not exceeded in 2009. HSY is responsible for monitoring the air quality in the Helsinki metropolitan area. The PM{sub 10} monitoring data in combination with electron microscopy based single particle compositional analysis and receptor modeling was used to evaluate dust source contributions on the exceedance days at HSY's air quality monitoring station in Mannerheimintie. Dust sources related to traction control (winter maintenance and pavement wear by studded tyres) contributed most to the PM{sub 10} concentrations in Mannerheimintie. On 12 exceeding days this group accounted for more than 50 % of PM{sub 10} particles, on 3 days the group alone was sufficient to cause the exceedance. On 3 of the exceedance days long-range transboundary air pollution or traffic exhaust emissions were on the same level with the traction control sources. On 11 days the most significant impact came from construction sites. (orig.)

  12. Quasi-ballistic carbon nanotube array transistors with current density exceeding Si and GaAs

    Science.gov (United States)

    Brady, Gerald J.; Way, Austin J.; Safron, Nathaniel S.; Evensen, Harold T.; Gopalan, Padma; Arnold, Michael S.

    2016-01-01

    Carbon nanotubes (CNTs) are tantalizing candidates for semiconductor electronics because of their exceptional charge transport properties and one-dimensional electrostatics. Ballistic transport approaching the quantum conductance limit of 2G0 = 4e2/h has been achieved in field-effect transistors (FETs) containing one CNT. However, constraints in CNT sorting, processing, alignment, and contacts give rise to nonidealities when CNTs are implemented in densely packed parallel arrays such as those needed for technology, resulting in a conductance per CNT far from 2G0. The consequence has been that, whereas CNTs are ultimately expected to yield FETs that are more conductive than conventional semiconductors, CNTs, instead, have underperformed channel materials, such as Si, by sixfold or more. We report quasi-ballistic CNT array FETs at a density of 47 CNTs μm−1, fabricated through a combination of CNT purification, solution-based assembly, and CNT treatment. The conductance is as high as 0.46 G0 per CNT. In parallel, the conductance of the arrays reaches 1.7 mS μm−1, which is seven times higher than the previous state-of-the-art CNT array FETs made by other methods. The saturated on-state current density is as high as 900 μA μm−1 and is similar to or exceeds that of Si FETs when compared at and equivalent gate oxide thickness and at the same off-state current density. The on-state current density exceeds that of GaAs FETs as well. This breakthrough in CNT array performance is a critical advance toward the exploitation of CNTs in logic, high-speed communications, and other semiconductor electronics technologies. PMID:27617293

  13. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  14. Jupiter's Auroral Energy Input Observed by Hisaki/EXCEED and its Modulations by Io's Volcanic Activity

    Science.gov (United States)

    Tao, C.; Kimura, T.; Tsuchiya, F.; Murakami, G.; Yoshioka, K.; Kita, H.; Yamazaki, A.; Kasaba, Y.; Yoshikawa, I.; Fujimoto, M.

    2016-12-01

    Aurora is an important indicator representing the momentum transfer from the fast-rotating outer planet to the magnetosphere and the energy input into the atmosphere through the magnetosphere-ionosphere coupling. Long-term monitoring of Jupiter's northern aurora was achieved by the Extreme Ultraviolet (EUV) spectrometer called EXCEED (Extreme Ultraviolet Spectroscope for Exospheric Dynamics) onboard JAXA's Earth-orbiting planetary space telescope Hisaki until today after its launch in September 2013. We have proceeded the statistical survey of the Jupiter's auroral energy input into the upper atmosphere. The auroral electron energy is estimated using a hydrocarbon color ratio (CR) adopted for the wavelength range of EXCEED, and the emission power in the long wavelength range 138.5-144.8 nm is used as an indicator of total emitted power before hydrocarbon absorption and auroral electron energy flux. Temporal dynamic variation of the auroral intensity was detected when Io's volcanic activity and thus EUV emission from the Io plasma torus are enhanced in the early 2015. Average of the total input power over 80 days increases by 10% with sometimes sporadically more than a factor of 3 upto 7, while the CR indicates the auroral electron energy decrease by 20% during the volcanic event compared to the other period. This indicates much more increase in the current system and Joule heating which contributes heating of the upper atmosphere. We will discuss the impact of this event on the upper atmosphere and ionosphere.

  15. Reference Projections Energy and Emissions 2005-2020

    International Nuclear Information System (INIS)

    Van Dril, A.W.N.; Elzenga, H.E.

    2005-10-01

    The Reference Projection 2005-2020 covers the future development of Dutch energy use, greenhouse gas emissions and air pollution up to 2020. The Reference projection is based on assumptions regarding economic, structural, technological and policy developments. Two scenarios have been used. The Strong Europe (SE) scenario is characterized by moderate economic growth and strong public responsibility. The Global Economy (GE) scenario assumes high economic growth and has a strong orientation towards private responsibility. Energy consumption continues to grow in both scenarios and energy intensity is declining in the GE-scenario. Gradual rise of temperature is now included in the estimates for space heating and air conditioning. Energy prices for end users will rise, due to increased imports of natural gas and rising costs of electricity generation. The share of renewables in electricity consumption increases considerably due to subsidies for wind at sea and biomass, up to the target of 9% in 2010. Emissions of non-CO2 greenhouse gases are reduced and stabilise after 2010. The Dutch Kyoto target is probably met in both scenarios, assuming considerable emission reduction ef-forts abroad. Acidifying emissions of NOx and SO2 stabilise after reductions, but at levels that exceed their national emission ceiling (NEC). Emissions of volatile organic compounds are projected to fall with approximately 25% between 2002 and 2010 below their NEC. Emissions of ammonia are projected to meet their NEC. The emission of particulate matter (PM10) will stabilise at present levels

  16. The international hydrocoin project

    International Nuclear Information System (INIS)

    1987-01-01

    The International HYDROCOIN (Hydrologic Code Intercomparison) Project was started in May 1984. Fourteen organizations participate in the Project, with the Swedish Nuclear Power Inspectorate (SKI) as managing participant and the OECD Nuclear Energy Agency (NEA) taking part as a member of the Project secretariat. HYDROCOIN is concerned with the assessment of groundwater movements at potential nuclear waste disposal sites with the help of mathematical models and computer codes. The Project is divided into three levels. The objective of HYDROCOIN Level 1 is to verify the accuracy of groundwater flow codes. HYDROCOIN Level 2 and Level 3 are concerned with validation of hydrological models and uncertainty/sensitivity analysis, respectively. This report, which has been prepared by the NEA Secretariat and SKI in consultation with the co-ordinating group of the HYDROCOIN Project summarizes the background and objectives of the Project and presents the results of the work performed up to the middle of 1987. It is intended to provide general information on HYDROCOIN to interested parties beyond the group of directly involved specialists

  17. Susceptibility of forests in the northeastern USA to nitrogen and sulfur deposition: critical load exceedance and forest health

    Science.gov (United States)

    N. Duarte; L.H. Pardo; M.J. Robin-Abbott

    2013-01-01

    The objectives of this study were to assess susceptibility to acidification and nitrogen (N) saturation caused by atmospheric deposition to northeastern US forests, evaluate the benefits and shortcomings of making critical load assessments using regional data, and assess the relationship between expected risk (exceedance) and forest health. We calculated the critical...

  18. Finance and supply management project execution plan; TOPICAL

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes

  19. Institutional Problems and Solutions of General Education in Chinese Universities

    Science.gov (United States)

    Meng, Weiqing; Huang, Wei

    2018-01-01

    Embedding general education in the Chinese university education system is a considerably complex systemic project, and a lack of institutional arrangements beneficial to general education has always been a key barrier in implementation. Currently, the main institutional restricting factors for university general education include substantial…

  20. Some Remarks on Stability of Generalized Equations

    Czech Academy of Sciences Publication Activity Database

    Outrata, Jiří; Henrion, R.; Kruger, A.Y.

    2013-01-01

    Roč. 159, č. 3 (2013), s. 681-697 ISSN 0022-3239 R&D Projects: GA AV ČR IAA100750802; GA ČR(CZ) GAP201/12/0671 Institutional support: RVO:67985556 Keywords : Parameterized generalized equation * Regular and limiting coderivative * Constant rank CQ * Mathematical program with equilibrium constraints Subject RIV: BA - General Mathematics Impact factor: 1.406, year: 2013 http://library.utia.cas.cz/separaty/2013/MTR/outrata-some remarks on stability of generalized equations.pdf

  1. Atmospheric dry and wet deposition of sulphur and nitrogen species and assessment of critical loads of acidic deposition exceedance in South Africa

    Directory of Open Access Journals (Sweden)

    Stuart J. Piketh

    2011-03-01

    Full Text Available We tested the hypothesis that acidic atmospheric pollution deposition, originating from the South African central industrial area, poses an environmental threat across a larger region within the dispersal footprint. A network of 37 passive monitoring sites to measure SO2 and NO2 was operated from August 2005 to September 2007. The area extended over the entire northern and eastern interior of South Africa. Monitoring locations were chosen to avoid direct impacts from local sources such as towns, mines and highways. Dry deposition rates of SO2 and NO2 were calculated from the measured concentrations. Concentrations of sulphur and nitrogen species in wet deposition from a previous study were used in conjunction with measured rainfall for the years 2006 and 2007 to estimate the wet deposition over the region. The calculated total (non-organic acidic deposition formed the basis for an assessment of exceedance of critical loads based on sensitivity of the regional soils. Regional soil sensitivity was determined by combining two major soil attributes available in the World Inventory of Soil Emission Potentials (International Soil Reference and Information Centre. Results indicate that certain parts of the central pollution source area on the South African Highveld have the potential for critical load exceedance, while limited areas downwind show lower levels of exceedance. Areas upwind and remote areas up and downwind, including forested areas of the Drakensberg escarpment, do not show any exceedance of the critical loads.

  2. Nearly half of the adolescents in an Italian school-based study exceeded the recommended upper limits for daily caffeine consumption.

    Science.gov (United States)

    Santangelo, Barbara; Lapolla, Rosa; Rutigliano, Irene; Pettoello Mantovani, Massimo; Campanozzi, Angelo

    2018-06-01

    No data are available on caffeine consumption among Italian adolescents. We investigated caffeine intake from coffee, soft drinks and energy drinks in a sample of Italian adolescents and determined if they exceeded the recommended limits. The study comprised 1213 adolescents with a mean age of 15.1 years (range 12-19) from four schools in Foggia, southern Italy. Caffeine intake was assessed using an anonymous self-reported questionnaire during the 2013/2014 school year. We calculated the percentage of daily caffeine consumers, their mean intake of caffeine from beverages and the contribution of each beverage category to the total caffeine intake. Approximately 76% of the sample consumed caffeine every day, amounting to 125.5 ± 69.2 mg/day and 2.1 ± 1.2 mg/kg/day. When we applied the reference values from the Academy of Pediatrics, we found that 46% of the adolescents exceeded the recommended upper limits. Coffee was the most frequently consumed caffeinated drink and the main contributor to daily caffeine intake. More than three quarters (76%) of the Italian adolescents in our study drank coffee on a daily basis and nearly half (46%) exceeded the recommended upper limits. Strategies are needed to reduce caffeine consumption by adolescents. ©2018 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  3. Sustainability of mega water diversion projects: Experience and lessons from China.

    Science.gov (United States)

    Yu, Min; Wang, Chaoran; Liu, Yi; Olsson, Gustaf; Wang, Chunyan

    2018-04-01

    Water availability and water demand are not evenly distributed in time and space. Many mega water diversion projects have been launched to alleviate water shortages in China. This paper analyzes the temporal and spatial features of 59 mega water diversion projects in China using statistical analysis. The relationship between nine major basins is measured using a network analysis method, and the associated economic, environmental and social impacts are explored using an impact analysis method. The study finds the development of water diversion has experienced four stages in China, from a starting period through to a period of high-speed development. Both the length of water diversion channels and the amount of transferred water have increased significantly in the past 50years. As of 2015, over 100billionm 3 of water was transferred in China through 16,000km in channels. These projects reached over half of China's provinces. The Yangtze River Basin is now the largest source of transferred water. Through inter-basin water diversion, China gains the opportunity to increase Gross Domestic Product by 4%. However, the construction costs exceed 150 billion US dollars, larger than in any other country. The average cost per unit of transferred water has increased with time and scale but decreased from western to eastern China. Furthermore, annual total energy consumption for pumping exceeded 50billionkilowatt-hours and the related greenhouse gas emissions are estimated to be 48milliontons. It is worth noting that ecological problems caused by water diversion affect the Han River and Yellow River Basins. Over 500 thousand people have been relocated away from their homes due to water diversion. To improve the sustainability of water diversion, four kinds of innovative measures have been provided for decision makers: national diversion guidelines, integrated water basin management, economic incentives and ex-post evaluation. Copyright © 2017 Elsevier B.V. All rights reserved.

  4. Topology of quasi-projective varieties and Lefschetz theory

    International Nuclear Information System (INIS)

    Eyral, Christophe

    2001-11-01

    This paper surveys Lefschetz's theory on the topology of non-singular complex projective varieties. It also includes the more recent generalizations to (singular) quasi-projective varieties, and a discussion on some related questions which are still open. (author)

  5. 1-MWp electrical photovoltaic plant (EPHOP - project)

    International Nuclear Information System (INIS)

    Vitanov, P.; Toneva, A.; Petkanchin, L.; Ivancheva, J.; Neshev, S.

    2000-01-01

    The presented project concerns the realization of a grid connected 1-MW p pilot photovoltaic plant on the territory of Bulgaria.The purpose of the project is to demonstrate and prove solar energy advantages. A special attention will be paid to the possibility the generated electricity to join the national electric network. The site selection according to the meteorological conditions as well as general aspects of the project are discussed

  6. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  7. Projecting temperature-related years of life lost under different climate change scenarios in one temperate megacity, China.

    Science.gov (United States)

    Li, Yixue; Li, Guoxing; Zeng, Qiang; Liang, Fengchao; Pan, Xiaochuan

    2018-02-01

    Temperature has been associated with population health, but few studies have projected the future temperature-related years of life lost attributable to climate change. To project future temperature-related disease burden in Tianjin, we selected years of life lost (YLL) as the dependent variable to explore YLL attributable to climate change. A generalized linear model (GLM) and distributed lag non-linear model were combined to assess the non-linear and delayed effects of temperature on the YLL of non-accidental mortality. Then, we calculated the YLL changes attributable to future climate scenarios in 2055 and 2090. The relationships of daily mean temperature with the YLL of non-accident mortality were basically U-shaped. Both the daily mean temperature increase on high-temperature days and its drop on low-temperature days caused an increase of YLL and non-accidental deaths. The temperature-related YLL will worsen if future climate change exceeds 2 °C. In addition, the adverse effects of extreme temperature on YLL occurred more quickly than that of the overall temperature. The impact of low temperature was greater than that of high temperature. Men were vulnerable to high temperature compared with women. This analysis highlights that the government should formulate environmental policies to reach the Paris Agreement goal. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Electricite de France: Lifetime Project

    International Nuclear Information System (INIS)

    Combes, Jean-Pierre

    1991-01-01

    Electricite de France produces almost 80% of its electricity by means of standardized PWR nuclear power stations. Starting in 1986, therefore, a project known as the 'Lifetime Project' was developed, whose aim was initially to ensure that the lifetime defined at design stage (40 years in general) could be attained without major difficulty (follow up of the aging process). It then became apparent that it would be useful to know just how far it would be technically and economically possible to go. As a result, the project is now working towards increasing the lifetime of power stations. (author)

  9. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  10. 34 CFR 75.620 - General conditions on publication.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false General conditions on publication. 75.620 Section 75... Must Be Met by a Grantee? Publications and Copyrights § 75.620 General conditions on publication. (a...) Required statement. The grantee shall ensure that any publication that contains project materials also...

  11. 15 CFR 921.60 - General.

    Science.gov (United States)

    2010-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Special Monitoring Projects § 921.60 General. (a) To provide a systematic basis for developing a high quality estuarine resource and ecosystem information base for National... three major phases of a monitoring program: (1) Studies necessary to collect data for a comprehensive...

  12. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  13. MEE-project: One year of public relations on the environment and energy. MEE-projekt: Een jaar voorlichten over milieu en energie

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1991-06-26

    A final overview is presented of the MEE-project ('Milieu- En Energie projekt' or Environmental and Energy project). The MEE-project was aimed at stimulating energy saving and improving the public attitude concerning energy and the environment. The project is also considered as an employment project for the unemployed. The main target group of the project was the households in the Dutch municipality Heerhugowaard. Five persons in search of employment offered interested private households options to save energy and the environment within their own surroundings by means of information and documentation. 5610 information packets were delivered. The costs did not exceed 115,000 Dutch guilders. The overall conclusion is positive: the people of the municipality are active in trying to save energy and the environment. Four of the five project members have new and better perspectives for a job.

  14. Hyper-Spectral Communications, Networking and ATM as Foundation for Safe and Efficient Future Flight: Transcending Aviation Operational Limitations with Diverse and Secure Multi-Band, Multi-Mode, and mmWave Wireless Links: Project Overview, Aviation Communications and New Signaling

    Science.gov (United States)

    Matolak, David W.

    2017-01-01

    NASA's Aeronautics Research Mission Directorate (ARMD) has recently solicited proposals and awarded funds for research and development to achieve and exceed the goals envisioned in the ARMD Strategic Implementation Plan (SIP). The Hyper-Spectral Communications and Networking for Air Traffic Management (ATM) (HSCNA) project is the only University Leadership Initiative (ULI) program to address communications and networking (and to a degree, navigation and surveillance). This paper will provide an overview of the HSCNA project, and specifically describe two of the project's technical challenges: comprehensive aviation communications and networking assessment, and proposed multi-band and multimode communications and networking. The primary goals will be described, as will be research and development aimed to achieve and exceed these goals. Some example initial results are also provided.

  15. A revised formula for 3-body recombination that cannot exceed the unitarity limit

    International Nuclear Information System (INIS)

    Greene, Chris H.; Esry, B.D.; Suno, H.

    2004-01-01

    We discuss the recent developments in theory and experiment that bear on our understanding of three-body recombination at ultracold temperatures. Some of these predictions include the fourth-power dependence of the three-body rate on the two-body scattering lenght a, the appearance of quantum mechanical shape resonance and Feshbach resonances, and the existence of destructive interference minima at large positive scattering lenghts. At very large scattering lenghts, however, the a 4 dependence of the recombination rate eventually will exceed the unitarity limit. We propose in this paper a simple way to correct this problem, permitting an approximate extension of previous predictions to slightly higher energies above the three-body fragmentation threshold. A preliminary comparison is carried out with a very recent experiment by Grimm and coworkers, showing reasonable agreement

  16. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J; Kaut, W [eds.

    1991-01-01

    This book, the proceedings of the fourth PV-Contractors' Meeting organized by the Commission of the European Communities, Directorate-General for Energy, held at Brussels on 21 and 22 November 1989, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the Energy Demonstration Program since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984, 1985 and 1986, describing progress with their projects. Summaries of the discussions held at the meeting, which included contractors whose projects were submitted in 1987, are also presented. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include desalination, communications, dairy farms, water pumping, and warning systems. Papers have been processed separately for inclusion on the data base.

  17. Generalized least squares and empirical Bayes estimation in regional partial duration series index-flood modeling

    DEFF Research Database (Denmark)

    Madsen, Henrik; Rosbjerg, Dan

    1997-01-01

    parameters is inferred from regional data using generalized least squares (GLS) regression. Two different Bayesian T-year event estimators are introduced: a linear estimator that requires only some moments of the prior distributions to be specified and a parametric estimator that is based on specified......A regional estimation procedure that combines the index-flood concept with an empirical Bayes method for inferring regional information is introduced. The model is based on the partial duration series approach with generalized Pareto (GP) distributed exceedances. The prior information of the model...

  18. Regional estimation of rainfall intensity-duration-frequency curves using generalized least squares regression of partial duration series statistics

    DEFF Research Database (Denmark)

    Madsen, H.; Mikkelsen, Peter Steen; Rosbjerg, Dan

    2002-01-01

    A general framework for regional analysis and modeling of extreme rainfall characteristics is presented. The model is based on the partial duration series (PDS) method that includes in the analysis all events above a threshold level. In the PDS model the average annual number of exceedances...

  19. 43 CFR 418.2 - How Project water may be used.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How Project water may be used. 418.2..., DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA General Provisions § 418.2 How Project water may be used. Project water may be delivered only to serve...

  20. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  1. Clinical Features of Ground Glass Opacity-Dominant Lung Cancer Exceeding 3.0 cm in the Whole Tumor Size.

    Science.gov (United States)

    Suzuki, Shigeki; Sakurai, Hiroyuki; Yotsukura, Masaya; Masai, Kyohei; Asakura, Keisuke; Nakagawa, Kazuo; Motoi, Noriko; Watanabe, Shun-Ichi

    2018-05-01

    Ground glass opacity (GGO)-dominant lung adenocarcinoma sized 3.0 cm or less in the whole tumor size is widely known to have an excellent prognosis and is regarded as early lung cancer. However, the characteristics and prognosis of lung cancer showing GGO exceeding 3.0 cm remains unclear. From 2002 through 2012, we reviewed 3,735 lung cancers that underwent complete resection at our institution. We identified 160 lung cancers (4.3%) showing GGO exceeding 3.0 cm on thin-section computed tomography and divided them into three types by the consolidation/tumor ratio (CTR) using cutoff values of 0.25 and 0.5. We compared the characteristics and prognosis among these types. Type A (CTR, 0 to ≤0.25), type B (CTR, >0.25 to ≤0.5), and type C (CTR, >0.5 to 3.0 cm can be considered to be in a group of patients with nodal-negative disease and an excellent prognosis. Copyright © 2018 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  2. Emission projections 2008-2012 versus national allocation plans II

    International Nuclear Information System (INIS)

    Neuhoff, Karsten; Ferrario, Federico; Grubb, Michael; Gabel, Etienne; Keats, Kim

    2006-01-01

    We compare the national allocation plans (NAPs), proposed and submitted by EU Member States as of October 2006, with our estimations for CO 2 emissions by the installations covered by these NAPs. The collective allocations proposed under phase II NAPs exceed the historic trend of emissions extrapolated forward. Using our projections we find, depending on uncertainty in fuel prices, economic growth rates, performance of the non-power sector and CDM/JI availability, a 15% chance of a 'dead market' with emissions below cap even at zero prices. With an expected inflow of committed CDM/JI credits of 100 MtCO 2 /year, allowance supply will exceed demand in 50% of cases without any carbon price, and in 80% of our euros20/tCO 2 scenarios. Banking of allowances towards post-2012 conditions could create additional demand, but this is difficult to anticipate and conditional on policy evolution. The proposed phase II NAPs would result in low prices and only small volumes of CDM/JI would enter the EU ETS. CDM/JI would almost exclusively be public-sector funded, placing the cost of Kyoto compliance entirely upon governments. (Author)

  3. Global artificial photosynthesis project: a scientific and legal introduction.

    Science.gov (United States)

    Faunce, Thomas

    2011-12-01

    With the global human population set to exceed 10 billion by 2050, its collective energy consumption to rise from 400 to over 500 EJ/yr and with the natural environment under increasing pressure from these sources as well as from anthropogenic climate change, political solutions such as the creation of an efficient carbon price and trading scheme may arrive too late. In this context, the scientific community is exploring technological remedies. Central to these options is artificial photosynthesis--the creation, particularly through nanotechnology, of devices capable to doing what plants have done for millions of years - transforming sunlight, water and carbon dioxide into food and fuel. This article argues that a Global Artificial Photosynthesis (GAP) project can raise the public profile and encourage the pace, complexity and funding of scientific collaborations in artificial photosynthesis research. The legal structure of a GAP project will be critical to prevent issues such as state sovereignty over energy and food resources and corporate intellectual monopoly privileges unduly inhibiting the important contribution of artificial photosynthesis to global public health and environmental sustainability. The article presents an introduction to the scientific and legal concepts behind a GAP project.

  4. Student Learning Projects in Electric Vehicle Engineering

    DEFF Research Database (Denmark)

    Ritchie, Ewen; Leban, Krisztina Monika

    2012-01-01

    This paper presents the didactic problem based learning method in general use at Aalborg University as applied to Electric Mobility. Advantage is taken of this method to link student learning to current research projects. This offers advantages to the students and the researchers. The paper...... introduces the subject, presents the research of the Department of Energy Technology and describes the relevant syllabus. It continues to present a range of titles of previous research linked student project projects, and to fill in some of the detail, an example of such a student project. The paper...

  5. Decommissioning of the research nuclear reactor WWR-S Magurele - Bucharest. General presentation of the project

    International Nuclear Information System (INIS)

    Dragulescu, Emilian; Dragusin, Mitica; Popa, Victor; Boicu, Alin; Tuca, Carmen; Iorga, Ioan; Vrabie, Ionut; Mustata, Carmen

    2003-01-01

    A decommissioning project was worked out concerning the nuclear facility research reactor WWR-S Magurele-Bucharest to remove the radioactive and hazardous materials and so to exclude any risk for human health and environment. The project involves the four phases named assessment, development, operations and closeout. There are two major parts to the assesment phase: preliminary characterisation and the review and decision-making process. Characterisation is needed to develop project baseline data, which should include sufficient chemical, physical, and radiological characterisation to meet planning needs. Based on the conclusions of these studies, possible decommissioning alternative will be analyzed and: the best alternative chosen, final goal identified, risk assessments are evaluated. Also, taken into account are: regulations supporting assessment, land use considerations, financial concerns, disposal availability, public involvement, technology developments. After a decommissioning alternative was chosen, detailed engineering will begin following appropriate regulatory guidance. The plan will include characterisation information, namely: review of decommissioning alternatives; justification for the selected alternative; provision for regulatory compliance; predictions of personnel exposure, radioactive waste volume, and cost. Other activities are: scheduling, preparation for decommissioning operations; coordination, documentation, characterization report, feasibility studies, Decommissioning Plan, project daily report, radiological survey, airborne sampling records, termination survey of the site. The operations imply: identification and sequencing the operations on contaminated materials, storing on site the wastes, awaiting processing or disposal, and packaging of materials for transport to processing or disposal facilities.The key operations are: worker protection, health and safety program, review of planing work, work area assessment, work area controls

  6. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  7. On a certain generalization of W-spaces

    Czech Academy of Sciences Publication Activity Database

    Doležal, Martin; Moors, W. B.

    2017-01-01

    Roč. 231, 1 November (2017), s. 1-9 ISSN 0166-8641 R&D Projects: GA ČR(CZ) GA17-27844S EU Projects: European Commission(XE) 318910 - AOS Institutional support: RVO:67985840 Keywords : topological games * Baire spaces * semitopological groups * separate continuity Subject RIV: BA - General Mathematics OBOR OECD: Pure mathematics Impact factor: 0.377, year: 2016 http://www.sciencedirect.com/science/article/pii/S0166864117304406?via%3Dihub

  8. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  9. Knowledge Utilization in Projects – a Practice-based

    DEFF Research Database (Denmark)

    Thuesen, Christian

    Drawing upon Practice-based theorizing in general and Actor Network Theory and theories of Communities of Practices in particular the paper develops an analytical strategy for understanding “life” in projects. The analytical strategy is applied on empirical material from an 18-month ethnographic...... study of a construction project. The project is interpreted as constellation of networked practices, which always is in the making. Participation in this project is a learning process where existing practices are reproduced and developed. This understanding of “life” in the project, frames a concluding...... analysis and discussion of the utilization of knowledge in the project....

  10. A Small Acoustic Goniometer for General Purpose Research.

    Science.gov (United States)

    Pook, Michael L; Loo, Sin Ming

    2016-04-29

    Understanding acoustic events and monitoring their occurrence is a useful aspect of many research projects. In particular, acoustic goniometry allows researchers to determine the source of an event based solely on the sound it produces. The vast majority of acoustic goniometry research projects used custom hardware targeted to the specific application under test. Unfortunately, due to the wide range of sensing applications, a flexible general purpose hardware/firmware system does not exist for this purpose. This article focuses on the development of such a system which encourages the continued exploration of general purpose hardware/firmware and lowers barriers to research in projects requiring the use of acoustic goniometry. Simulations have been employed to verify system feasibility, and a complete hardware implementation of the acoustic goniometer has been designed and field tested. The results are reported, and suggested areas for improvement and further exploration are discussed.

  11. General Physics Section. Progress Report Fiscal Year 1969/70

    Energy Technology Data Exchange (ETDEWEB)

    Braun, J

    1970-12-15

    This report contains information regarding that part of the work performed at the General Physics Section of AB Atomenergi during the period July 1969 - July 1970, which has been supported by grants from the Swedish Board of Technical Development (STU). For projects still in progress the current status is described, for terminated projects, or distinguishable parts thereof, a summary is given. Where available, reports describing the work are listed. A substantial part of our resources has been concentrated on the physics of energy conversion: Investigation of recombination processes in a pulsed helium discharge; Theoretical and experimental investigation of MHD gas flow; Isotopic battery in the muW-range. Our section's interest in nuclear dosimetry and the general aspects of metrology has been manifested in two additional projects: Application of mass spectrometry on He in solids to analysis, nuclear physics and material technology; Servo system filter. As general information it can be added that other, not STU-supported, activities of the section are material dosimetry for irradiation monitoring and a fairly broad range of radiation shielding activities

  12. General Physics Section. Progress Report Fiscal Year 1969/70

    International Nuclear Information System (INIS)

    Braun, J.

    1970-12-01

    This report contains information regarding that part of the work performed at the General Physics Section of AB Atomenergi during the period July 1969 - July 1970, which has been supported by grants from the Swedish Board of Technical Development (STU). For projects still in progress the current status is described, for terminated projects, or distinguishable parts thereof, a summary is given. Where available, reports describing the work are listed. A substantial part of our resources has been concentrated on the physics of energy conversion: Investigation of recombination processes in a pulsed helium discharge; Theoretical and experimental investigation of MHD gas flow; Isotopic battery in the μW-range. Our section's interest in nuclear dosimetry and the general aspects of metrology has been manifested in two additional projects: Application of mass spectrometry on He in solids to analysis, nuclear physics and material technology; Servo system filter. As general information it can be added that other, not STU-supported, activities of the section are material dosimetry for irradiation monitoring and a fairly broad range of radiation shielding activities

  13. Use of general purpose graphics processing units with MODFLOW

    Science.gov (United States)

    Hughes, Joseph D.; White, Jeremy T.

    2013-01-01

    To evaluate the use of general-purpose graphics processing units (GPGPUs) to improve the performance of MODFLOW, an unstructured preconditioned conjugate gradient (UPCG) solver has been developed. The UPCG solver uses a compressed sparse row storage scheme and includes Jacobi, zero fill-in incomplete, and modified-incomplete lower-upper (LU) factorization, and generalized least-squares polynomial preconditioners. The UPCG solver also includes options for sequential and parallel solution on the central processing unit (CPU) using OpenMP. For simulations utilizing the GPGPU, all basic linear algebra operations are performed on the GPGPU; memory copies between the central processing unit CPU and GPCPU occur prior to the first iteration of the UPCG solver and after satisfying head and flow criteria or exceeding a maximum number of iterations. The efficiency of the UPCG solver for GPGPU and CPU solutions is benchmarked using simulations of a synthetic, heterogeneous unconfined aquifer with tens of thousands to millions of active grid cells. Testing indicates GPGPU speedups on the order of 2 to 8, relative to the standard MODFLOW preconditioned conjugate gradient (PCG) solver, can be achieved when (1) memory copies between the CPU and GPGPU are optimized, (2) the percentage of time performing memory copies between the CPU and GPGPU is small relative to the calculation time, (3) high-performance GPGPU cards are utilized, and (4) CPU-GPGPU combinations are used to execute sequential operations that are difficult to parallelize. Furthermore, UPCG solver testing indicates GPGPU speedups exceed parallel CPU speedups achieved using OpenMP on multicore CPUs for preconditioners that can be easily parallelized.

  14. General presentation of the EC FP7 SARGEN IV project

    International Nuclear Information System (INIS)

    Blanc, Daniel

    2012-01-01

    SARGEN I V project: Innovative reactors with fast spectrum to be built in Europe. The ESNII roadmap includes: • the ASTRID SFR prototype supported by the French Government; • ALFRED LFR demonstrator; → Romania is interested to host the ALFRED prototype. • the ALLEGRO GFR prototype → A Memorandum of Understanding (MOU) has been signed in May 2010 between UJV (Czech Republic), AEKI (Hungary) and VUJE (Slovakia) to develop ALLEGRO. • the MYRRHA experimental facility supported by the Belgian government is able to: → test the LFR technology; → provide irradiation in the fast spectrum area; → test the Accelerator Driven System (ADS) technology (not retained by the GIF)

  15. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  16. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  17. Monte Carlo advances for the Eolus Asci Project

    International Nuclear Information System (INIS)

    Hendrick, J. S.; McKinney, G. W.; Cox, L. J.

    2000-01-01

    The Eolus ASCI project includes parallel, 3-D transport simulation for various nuclear applications. The codes developed within this project provide neutral and charged particle transport, detailed interaction physics, numerous source and tally capabilities, and general geometry packages. One such code is MCNPW which is a general purpose, 3-dimensional, time-dependent, continuous-energy Monte Carlo fully-coupled N-Particle transport code. Significant advances are also being made in the areas of modern software engineering and parallel computing. These advances are described in detail

  18. 45 CFR 74.35 - Supplies.

    Science.gov (United States)

    2010-10-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND... exceeding $5000 in total aggregate value upon termination or completion of the project or program and the...

  19. Projections of precipitation, air temperature and potential ...

    African Journals Online (AJOL)

    mabouelhaggag

    Precipitation and air temperature records from 6 sites in Rwanda in the period from 1964 to 2010 are used for past/present climate assessment. Future climate projections (2010-2099) based on 3 general circulation models and 2 emission scenarios (A2 and B1) are used for climate projections. Precipitation, air temperature ...

  20. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  1. Teaching and learning English through digital game projects

    Directory of Open Access Journals (Sweden)

    Jonathan deHaan

    2011-04-01

    Full Text Available Digital games are receiving increasing attention by researchers and practitioners in education; however, most of the theory and pedagogy focus on general education or language and literacy development of native speakers. There are very few investigations of game play or game culture and second language development. Language teachers and institutions must know more about games to use the media effectively. Two completed extracurricular projects, based on constructionist learning and media literacy theories and practices, are described in this paper: game design and game magazine creation. The action research projects aimed to guide students towards a better understanding of games’ formal features and technologies through their active creation of games and game-related media, and to improve their spoken and written English language skills. In general, students learned and practised a variety of language and technology skills with the design projects. The projects motivated the students, challenged the students, and provided many opportunities for authentic discussions in the foreign language. Various suggestions, based on the teacher and student experiences of these projects, are made for other language teachers interested in conducting creative game-based projects with their students.

  2. Generalized Landau-Pollak uncertainty relation

    International Nuclear Information System (INIS)

    Miyadera, Takayuki; Imai, Hideki

    2007-01-01

    The Landau-Pollak uncertainty relation treats a pair of rank one projection valued measures and imposes a restriction on their probability distributions. It gives a nontrivial bound for summation of their maximum values. We give a generalization of this bound (weak version of the Landau-Pollak uncertainty relation). Our generalization covers a pair of positive operator valued measures. A nontrivial but slightly weak inequality that can treat an arbitrary number of positive operator valued measures is also presented. A possible application to the problem of separability criterion is also suggested

  3. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  4. 45 CFR 1385.1 - General.

    Science.gov (United States)

    2010-10-01

    ...) University Affiliated Programs (UAPs). [52 FR 44845, Nov. 20, 1987, as amended at 54 FR 47984, Nov. 20, 1989... PROGRAM REQUIREMENTS APPLICABLE TO THE DEVELOPMENTAL DISABILITIES PROGRAM § 1385.1 General. Except as specified in § 1385.4, the requirements in this part are applicable to the following programs and projects...

  5. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    .... The Natural Programming Project is developing general principles, methods, and programming language designs that will significantly reduce the amount of learning and effort needed to write programs...

  6. [Research interest by general practitioners: a survey].

    Science.gov (United States)

    Rossi, S; Zoller, M; Steurer, J

    2006-12-06

    For doing research on topics in primary care medicine participation of primary care physicians is necessary. Research in this field of medicine is only marginally established in Switzerland. In a postal survey we evaluate the general attitudes of physicians towards research in the field of primary care. In particular we were interested in their willingness to participate in research projects and the facilitating and impeding factors to take part in such projects. A purpose designed questionnaire was sent by post to 3044 primary care physicians in the central and eastern parts of Switzerland. The return rate was 52%. A majority of 94% of the responding physicians revealed interest in primary care research and 60% of all responders are willing to participate actively in such projects. They are prepared to spend about 15 min a day for data acquisition. Their willingness to participate depends on the conditions that, first, the research topic is relevant for daily practice and, second, boards odder Continuous Medical Education credits for time spent for research. Time constraints, additional administrative work and lack of relevance of research topics to daily practice are the main barriers. This survey demonstrates the general interest of primary care physicians to participate in relevant research projects. Therefore the structure to set up such research should be established.

  7. The Rocky Flats Environmental Technology Site beryllium characterization project

    International Nuclear Information System (INIS)

    Morrell, D.M.; Miller, J.R.; Allen, D.F.

    1999-01-01

    A site beryllium characterization project was completed at the Rocky Flats Environmental Technology Site (RFETS) in 1997. Information from historical reviews, previous sampling surveys, and a new sampling survey were used to establish a more comprehensive understanding of the locations and levels of beryllium contamination in 35 buildings. A feature of the sampling strategy was to test if process knowledge was a good predictor of where beryllium contamination could be found. Results revealed that this technique was effective at identifying where surface contamination levels might exceed the RFETS smear control level but that it was not effective in identifying where low concentrations of beryllium might be found

  8. MYRRHA project: an Accelerator Driven System (ADS) Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Ait Abderrahim, H

    2000-07-01

    The goal of the MYRRHA project is to investigate the design, development and realisation of a versatile neutron source based on an Accelerator Driven System (ADS). Efforts in 1999 were focussed on the optimisation of a high-performance device with a maximum neutron flux for MA irradiation experiments of 1.10{sup 1}'5 n/cm{sup 2}.s with neutron energies exceeding 0.75 MeV and about 3.10{sup 15} n/cm{sup 2}.s for all energies. Design proposals for different MYRRHA ADS components including the accelerator and the spallation source were elaborated. Potential applications of an ADS neutron source as well as various engineering aspects are discussed.

  9. Generalized Disjunctions in (Infinitary) Structural Consequence Relations

    Czech Academy of Sciences Publication Activity Database

    Cintula, Petr; Noguera, C.

    2012-01-01

    Roč. 18, č. 3 (2012), s. 442-443 ISSN 1079-8986. [Logic Colloquium 2011. 11.07.2011-16.07.2011, Barcelona] R&D Projects: GA MŠk(CZ) 1M0545 Institutional research plan: CEZ:AV0Z10300504 Keywords : Abstract Algebraic Logic * Generalized disjunction * Proof by cases properties * Consequence relations Subject RIV: BA - General Mathematics http://www.math.ucla.edu/~asl/bsl/1803- toc .htm

  10. 20 CFR 641.740 - How will the Department determine whether a grantee fails, meets, or exceeds the expected levels...

    Science.gov (United States)

    2010-04-01

    ... determine whether a grantee fails, meets, or exceeds the expected levels of performance for the core indicators and what will be the consequences of failing to meet expected levels of performance? (a) Aggregate... determine if a national grantee has met the expected levels of performance (including any adjustments to...

  11. Gusts and shear within hurricane eyewalls can exceed offshore wind turbine design standards

    Science.gov (United States)

    Worsnop, Rochelle P.; Lundquist, Julie K.; Bryan, George H.; Damiani, Rick; Musial, Walt

    2017-06-01

    Offshore wind energy development is underway in the U.S., with proposed sites located in hurricane-prone regions. Turbine design criteria outlined by the International Electrotechnical Commission do not encompass the extreme wind speeds and directional shifts of hurricanes stronger than category 2. We examine a hurricane's turbulent eyewall using large-eddy simulations with Cloud Model 1. Gusts and mean wind speeds near the eyewall of a category 5 hurricane exceed the current Class I turbine design threshold of 50 m s-1 mean wind and 70 m s-1 gusts. Largest gust factors occur at the eye-eyewall interface. Further, shifts in wind direction suggest that turbines must rotate or yaw faster than current practice. Although current design standards omit mention of wind direction change across the rotor layer, large values (15-50°) suggest that veer should be considered.

  12. [Dementia friendly care services in general hospitals : Representative results of the general hospital study (GHoSt)].

    Science.gov (United States)

    Hendlmeier, Ingrid; Bickel, Horst; Hessler, Johannes Baltasar; Weber, Joshua; Junge, Magdalena Nora; Leonhardt, Sarah; Schäufele, Martina

    2017-11-06

    Mostly model projects report on special care services and procedures for general hospital patients with cognitive impairment. The objective of this study was to determine the frequency of special care services and procedures in general hospitals on the basis of a representative cross-sectional study. From a list of all general hospitals in southern Germany we randomly selected a specified number of hospitals und somatic wards. The hospitals were visited and all older patients on the selected wards on that day were included in the study. Information about care services and their utilization was collected with standardized instruments. A total of 33 general hospitals and 172 wards participated in the study. The patient sample included 1469 persons over 65 (mean age 78.6 years) and 40% of the patients showed cognitive impairments. The staff reported that the most frequent measures for patients with cognitive impairments concerned patients with wandering behavior (63.1%), efforts to involve the patients' relatives to help with their daily care (60.1%), conducting nonintrusive interviews to identify cognitive impairments (59.9%), allocation to other rooms (58%) and visual aids for place orientation of patients (50.6%). In accordance with earlier studies our results show that other dementia friendly services implemented in pilot projects were rare. The existing special services for patients with cognitive impairment were rarely used by the patients or their relatives. The results demonstrate the urgent need to improve special care services and routines for identification of elderly patients with cognitive impairment and risk of delirium in general hospitals.

  13. Chaos control and generalized projective synchronization of heavy symmetric chaotic gyroscope systems via Gaussian radial basis adaptive variable structure control

    International Nuclear Information System (INIS)

    Farivar, Faezeh; Aliyari Shoorehdeli, Mahdi; Nekoui, Mohammad Ali; Teshnehlab, Mohammad

    2012-01-01

    Highlights: ► A systematic procedure for GPS of unknown heavy chaotic gyroscope systems. ► Proposed methods are based on Lyapunov stability theory. ► Without calculating Lyapunov exponents and Eigen values of the Jacobian matrix. ► Capable to extend for a variety of chaotic systems. ► Useful for practical applications in the future. - Abstract: This paper proposes the chaos control and the generalized projective synchronization methods for heavy symmetric gyroscope systems via Gaussian radial basis adaptive variable structure control. Because of the nonlinear terms of the gyroscope system, the system exhibits chaotic motions. Occasionally, the extreme sensitivity to initial states in a system operating in chaotic mode can be very destructive to the system because of unpredictable behavior. In order to improve the performance of a dynamic system or avoid the chaotic phenomena, it is necessary to control a chaotic system with a periodic motion beneficial for working with a particular condition. As chaotic signals are usually broadband and noise like, synchronized chaotic systems can be used as cipher generators for secure communication. This paper presents chaos synchronization of two identical chaotic motions of symmetric gyroscopes. In this paper, the switching surfaces are adopted to ensure the stability of the error dynamics in variable structure control. Using the neural variable structure control technique, control laws are established which guarantees the chaos control and the generalized projective synchronization of unknown gyroscope systems. In the neural variable structure control, Gaussian radial basis functions are utilized to on-line estimate the system dynamic functions. Also, the adaptation laws of the on-line estimator are derived in the sense of Lyapunov function. Thus, the unknown gyro systems can be guaranteed to be asymptotically stable. Also, the proposed method can achieve the control objectives. Numerical simulations are presented to

  14. Hyperbolicity of projective hypersurfaces

    CERN Document Server

    Diverio, Simone

    2016-01-01

    This book presents recent advances on Kobayashi hyperbolicity in complex geometry, especially in connection with projective hypersurfaces. This is a very active field, not least because of the fascinating relations with complex algebraic and arithmetic geometry. Foundational works of Serge Lang and Paul A. Vojta, among others, resulted in precise conjectures regarding the interplay of these research fields (e.g. existence of Zariski dense entire curves should correspond to the (potential) density of rational points). Perhaps one of the conjectures which generated most activity in Kobayashi hyperbolicity theory is the one formed by Kobayashi himself in 1970 which predicts that a very general projective hypersurface of degree large enough does not contain any (non-constant) entire curves. Since the seminal work of Green and Griffiths in 1979, later refined by J.-P. Demailly, J. Noguchi, Y.-T. Siu and others, it became clear that a possible general strategy to attack this problem was to look at particular algebr...

  15. 28 CFR 512.20 - Publication of results of research project.

    Science.gov (United States)

    2010-07-01

    ... project. 512.20 Section 512.20 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  16. The 5th National Audit Project (NAP5) on accidental awareness during general anaesthesia: summary of main findings and risk factors.

    Science.gov (United States)

    Pandit, J J; Andrade, J; Bogod, D G; Hitchman, J M; Jonker, W R; Lucas, N; Mackay, J H; Nimmo, A F; O'Connor, K; O'Sullivan, E P; Paul, R G; Palmer, J H MacG; Plaat, F; Radcliffe, J J; Sury, M R J; Torevell, H E; Wang, M; Hainsworth, J; Cook, T M

    2014-10-01

    We present the main findings of the 5th National Audit Project on accidental awareness during general anaesthesia. Incidences were estimated using reports of accidental awareness as the numerator, and a parallel national anaesthetic activity survey to provide denominator data. The incidence of certain/probable and possible accidental awareness cases was ~1:19 600 anaesthetics (95% CI 1:16 700-23 450). However, there was considerable variation across subtypes of techniques or subspecialties. The incidence with neuromuscular blockade was ~1:8200 (1:7030-9700), and without it was ~1:135 900 (1:78 600-299 000). The cases of accidental awareness during general anaesthesia reported to 5th National Audit Project were overwhelmingly cases of unintended awareness during neuromuscular blockade. The incidence of accidental awareness during caesarean section was ~1:670 (1:380-1300). Two thirds (82, 66%) of cases of accidental awareness experiences arose in the dynamic phases of anaesthesia, namely induction of and emergence from anaesthesia. During induction of anaesthesia, contributory factors included: use of thiopental; rapid sequence induction; obesity; difficult airway management; neuromuscular blockade; and interruptions of anaesthetic delivery during movement from anaesthetic room to theatre. During emergence from anaesthesia, residual paralysis was perceived by patients as accidental awareness, and commonly related to a failure to ensure full return of motor capacity. One third (43, 33%) of accidental awareness events arose during the maintenance phase of anaesthesia, most due to problems at induction or towards the end of anaesthesia. Factors increasing the risk of accidental awareness included: female sex; age (younger adults, but not children); obesity; anaesthetist seniority (junior trainees); previous awareness; out-of-hours operating; emergencies; type of surgery (obstetric, cardiac, thoracic); and use of neuromuscular blockade. The following factors were

  17. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  18. A Comprehensive Toolset for General-Purpose Private Computing and Outsourcing

    Science.gov (United States)

    2016-12-08

    contexts businesses are also hesitant to make their proprietary available to the cloud [1]. While in general sensitive data can be protected by the...data sources, gathering and maintaining the data needed , and completing and reviewing the collection of information. Send comments regarding this...project and scientific advances made towards each of the research thrusts throughout the project duration. 1 Project Objectives Cloud computing enables

  19. Smoothing and projecting age-specific probabilities of death by TOPALS

    Directory of Open Access Journals (Sweden)

    Joop de Beer

    2012-10-01

    Full Text Available BACKGROUND TOPALS is a new relational model for smoothing and projecting age schedules. The model is operationally simple, flexible, and transparent. OBJECTIVE This article demonstrates how TOPALS can be used for both smoothing and projecting age-specific mortality for 26 European countries and compares the results of TOPALS with those of other smoothing and projection methods. METHODS TOPALS uses a linear spline to describe the ratios between the age-specific death probabilities of a given country and a standard age schedule. For smoothing purposes I use the average of death probabilities over 15 Western European countries as standard, whereas for projection purposes I use an age schedule of 'best practice' mortality. A partial adjustment model projects how quickly the death probabilities move in the direction of the best-practice level of mortality. RESULTS On average, TOPALS performs better than the Heligman-Pollard model and the Brass relational method in smoothing mortality age schedules. TOPALS can produce projections that are similar to those of the Lee-Carter method, but can easily be used to produce alternative scenarios as well. This article presents three projections of life expectancy at birth for the year 2060 for 26 European countries. The Baseline scenario assumes a continuation of the past trend in each country, the Convergence scenario assumes that there is a common trend across European countries, and the Acceleration scenario assumes that the future decline of death probabilities will exceed that in the past. The Baseline scenario projects that average European life expectancy at birth will increase to 80 years for men and 87 years for women in 2060, whereas the Acceleration scenario projects an increase to 90 and 93 years respectively. CONCLUSIONS TOPALS is a useful new tool for demographers for both smoothing age schedules and making scenarios.

  20. General catalogue of products and services - geology. AERO data base. 2. ed.

    International Nuclear Information System (INIS)

    1995-01-01

    The catalogue in the second edition aims at presenting to the user a general idea on the aerogeophysical projects of Brazil database (AERO) which belongs to SIGA (Brazilian geological information system). The 151 documents (projects) are listed as follows: 52 projects performed by CPRM/DNPM - Departamento Nacional de Producao Mineral; 33 projects performed by CNEN - Commissao Nacional de Energia Nuclear and NUCLEBRAS; 7 projects executed by State government and private companies; and 59 projects executed for PETROBRAS

  1. IT Project Portfolio Management; Challenges faced by Danish municipalities

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2010-01-01

    Abstract. Increasing the organizational benefits from IT projects is a key concern in most organizations. The use of Project Portfolio Management (PPM) is generally recommended by consultants (e.g. Kaplan 2005) and researchers (e.g. De Reyck et al 2005) as one way of increasing the organizational...... benefits from IT investments. This article reports from an action research project aiming at understanding and improving IT PPM practices in Danish municipalities, thereby contributing to the general body of knowledge concerning PPM of IT projects. Our findings suggest that the participating organizations...... might benefit from a structured approach as suggested by the literature (e.g. Kaplan 2005), but also that the prescriptive PPM literature in some areas is too simplistic when compared to the reality faced by the participating practitioners. Especially, our research suggests that different PPM elements...

  2. Real-Time Continuous Response Spectra Exceedance Calculation Displayed in a Web-Browser Enables Rapid and Robust Damage Evaluation by First Responders

    Science.gov (United States)

    Franke, M.; Skolnik, D. A.; Harvey, D.; Lindquist, K.

    2014-12-01

    A novel and robust approach is presented that provides near real-time earthquake alarms for critical structures at distributed locations and large facilities using real-time estimation of response spectra obtained from near free-field motions. Influential studies dating back to the 1980s identified spectral response acceleration as a key ground motion characteristic that correlates well with observed damage in structures. Thus, monitoring and reporting on exceedance of spectra-based thresholds are useful tools for assessing the potential for damage to facilities or multi-structure campuses based on input ground motions only. With as little as one strong-motion station per site, this scalable approach can provide rapid alarms on the damage status of remote towns, critical infrastructure (e.g., hospitals, schools) and points of interests (e.g., bridges) for a very large number of locations enabling better rapid decision making during critical and difficult immediate post-earthquake response actions. Details on the novel approach are presented along with an example implementation for a large energy company. Real-time calculation of PSA exceedance and alarm dissemination are enabled with Bighorn, an extension module based on the Antelope software package that combines real-time spectral monitoring and alarm capabilities with a robust built-in web display server. Antelope is an environmental data collection software package from Boulder Real Time Technologies (BRTT) typically used for very large seismic networks and real-time seismic data analyses. The primary processing engine produces continuous time-dependent response spectra for incoming acceleration streams. It utilizes expanded floating-point data representations within object ring-buffer packets and waveform files in a relational database. This leads to a very fast method for computing response spectra for a large number of channels. A Python script evaluates these response spectra for exceedance of one or more

  3. Inductive teaching by interacting with CDIO-projects

    DEFF Research Database (Denmark)

    Goltermann, Per

    as a inductive starting point for the traditional teaching and by creating a basis for a CDIO-project, which runs parallel to the last part of the course. The use of such results as a starting point for the teaching allows the teacher to start with simple observations from tests and to build the general...... the added benefit that it proves to the students that their project results are valuable and useful, which again increases motivation in the course and in the projects....

  4. A Projection free method for Generalized Eigenvalue Problem with a nonsmooth Regularizer.

    Science.gov (United States)

    Hwang, Seong Jae; Collins, Maxwell D; Ravi, Sathya N; Ithapu, Vamsi K; Adluru, Nagesh; Johnson, Sterling C; Singh, Vikas

    2015-12-01

    Eigenvalue problems are ubiquitous in computer vision, covering a very broad spectrum of applications ranging from estimation problems in multi-view geometry to image segmentation. Few other linear algebra problems have a more mature set of numerical routines available and many computer vision libraries leverage such tools extensively. However, the ability to call the underlying solver only as a "black box" can often become restrictive. Many 'human in the loop' settings in vision frequently exploit supervision from an expert, to the extent that the user can be considered a subroutine in the overall system. In other cases, there is additional domain knowledge, side or even partial information that one may want to incorporate within the formulation. In general, regularizing a (generalized) eigenvalue problem with such side information remains difficult. Motivated by these needs, this paper presents an optimization scheme to solve generalized eigenvalue problems (GEP) involving a (nonsmooth) regularizer. We start from an alternative formulation of GEP where the feasibility set of the model involves the Stiefel manifold. The core of this paper presents an end to end stochastic optimization scheme for the resultant problem. We show how this general algorithm enables improved statistical analysis of brain imaging data where the regularizer is derived from other 'views' of the disease pathology, involving clinical measurements and other image-derived representations.

  5. Global Land Survey Impervious Mapping Project Web Site

    Science.gov (United States)

    DeColstoun, Eric Brown; Phillips, Jacqueline

    2014-01-01

    The Global Land Survey Impervious Mapping Project (GLS-IMP) aims to produce the first global maps of impervious cover at the 30m spatial resolution of Landsat. The project uses Global Land Survey (GLS) Landsat data as its base but incorporates training data generated from very high resolution commercial satellite data and using a Hierarchical segmentation program called Hseg. The web site contains general project information, a high level description of the science, examples of input and output data, as well as links to other relevant projects.

  6. Complex Wedge-Shaped Matrices: A Generalization of Jacobi Matrices

    Czech Academy of Sciences Publication Activity Database

    Hnětynková, Iveta; Plešinger, M.

    2015-01-01

    Roč. 487, 15 December (2015), s. 203-219 ISSN 0024-3795 R&D Projects: GA ČR GA13-06684S Keywords : eigenvalues * eigenvector * wedge-shaped matrices * generalized Jacobi matrices * band (or block) Krylov subspace methods Subject RIV: BA - General Mathematics Impact factor: 0.965, year: 2015

  7. Continuing professional development for general practitioners

    DEFF Research Database (Denmark)

    Tulinius, Charlotte; Hølge-Hazelton, Bibi

    2010-01-01

    OBJECTIVES: The profession of medicine has long been characterised by virtues such as authorisation, specialisation, autonomy, self-regulation and adherence to an ethical code of practice, and its complexity has granted it the privilege of self-regulation. Studies have shown continuing professional...... development (CPD) for general practitioners (GPs) to be most effective when it is set up within a multi-method design. This paper reports a research-based evaluation of a 2-year educational CPD project for 21 GPs. METHODS: The project focused on the issue of 'children in need' and was delivered through group...

  8. Auditoria del projecte titulat “Adaptació del projecte de reurbanització dels interiors de Guineueta Fase 2”

    OpenAIRE

    Farrerons Vidal, Óscar; Marti, Miquel

    2013-01-01

    Auditoria tècnica del projecte, tenint en compte el Plec de Prescripcions per a l’assistència de la revisió de projectes d’infraestructures per a BIMSA. Aquesta revisió té dos parts, un dedicada a l’auditoria general, i una altra dedicada a l’estructuració informàtica del document.

  9. Dual decomposition for parsing with non-projective head automata

    OpenAIRE

    Koo, Terry; Rush, Alexander Matthew; Collins, Michael; Jaakkola, Tommi S.; Sontag, David Alexander

    2010-01-01

    This paper introduces algorithms for non-projective parsing based on dual decomposition. We focus on parsing algorithms for non-projective head automata, a generalization of head-automata models to non-projective structures. The dual decomposition algorithms are simple and efficient, relying on standard dynamic programming and minimum spanning tree algorithms. They provably solve an LP relaxation of the non-projective parsing problem. Empirically the LP relaxation is very often tight: for man...

  10. Projects financing in the hydrocarbons sector: a necessary help in some cases

    International Nuclear Information System (INIS)

    Musset, O.; Salles, E.

    2003-01-01

    French banks are in the forefront of the financing of international projects of the petroleum industry. Among these banks, the most active one is certainly Societe Generale, which ranks second at the world scale and first in the Middle-East area for 2002. With a significant presence in the hydrocarbons sector, it participates also to the development of projects as huge as the BTC pipeline between Bakou and Ceyhan and the ELNG gas liquefaction project in Egypt in association with Gaz de France company. This paper reprints an interview of O. Musset, director of project and sectorial finance of Societe Generale. (J.S.)

  11. Neurological and neurophysiological examinations of workers exposed to arsenic levels exceeding hygiene standards

    Directory of Open Access Journals (Sweden)

    Halina Sińczuk-Walczak

    2014-12-01

    Full Text Available Objectives: The assessment of the neurotoxic effect of arsenic (As and its inorganic compounds is still the subject of interest due to a growing As application in a large array of technologies and the need to constantly verify the principles of prevention and technological parameters. The aim of this study was to determine the status of the nervous system (NS in workers exposed to As at concentrations exceeding hygiene standards (Threshold Limit Values (TLV – 10 μg/m3, Biological Exposure Index (BEI – 35 μg/l and to analyze the relationship between the NS functional state, species of As in urine and As levels in the workplace air. Material and Methods: The study group comprised 21 men (mean age: 47.43±7.59 employed in a copper smelting factory (mean duration of employment: 22.29±11.09. The control group comprised 16 men, matched by age and work shifts. Arsenic levels in the workplace air (As-A ranged from 0.7 to 92.3 μg/m3; (M = 25.18±28.83. The concentration of total arsenic in urine (Astot-U ranged from 17.35 to 434.68 μg/l (M = 86.82±86.6. Results: Syndrome of peripheral nervous system (PNS was manifested by extremity fatigue (28.6%, extremity pain (33.3% and paresthesia in the lower extremities (33.3%, as well as by neuropathy-type mini-symptoms (23.8%. Electroneurographic (ENeG tests of peroneal nerves showed significantly decreased response amplitude with normal values of motor conduction velocity (MCV. Stimulation of sural nerves revealed a significantly slowed sensory conduction velocity (SCV and decreased sensory potential amplitude. Neurophysiological parameters and the results of biological and environmental monitoring showed a relationship between Astot, AsIII (trivalent arsenic, the sum of iAs (AsIII+AsV (pentavalent arsenic+MMA (monomethylarsonic acid concentration in urine and As levels in the air. Conclusions: The results of the study demonstrate that occupational exposure to inorganic arsenic levels exceeding hygiene

  12. 42 CFR 50.208 - Program or project requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Program or project requirements. 50.208 Section 50.208 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Sterilization of Persons in Federally Assisted Family Planning Projects § 50.208...

  13. Composition and sources of particles in Mannerheimintie during exceedance days of PM{sub 10} limit value in 2010; Hiukkasten koostumus ja laehteet Mannerheimintiellae PM{sub 10}-raja-arvon ylityspaeivinae 2010

    Energy Technology Data Exchange (ETDEWEB)

    Kupiainen, K.; Niemi, J.; Ritola, R.; Stojiljkovic, A.

    2012-02-15

    The purpose of the work was to determine sources of respirable particles (PM{sub 10}) in the center of Helsinki, at the measurement station in Mannerheimintie traffic site, in 2010 during the days when the daily average concentration of PM{sub 10} exceeded 50 mug/m3. By the end of the year (2010) the number of this kind of days was 24. The allowed number of exceedance days per year is 35, so the limit value was not exceeded in 2010. Similar work has been carried out in 2008 and 2009 and this report also summarizes results from all three years. HSY is responsible for monitoring the air quality in the Helsinki metropolitan area. The PM{sub 10} monitoring data in combination with electron microscopy based single particle compositional analysis and receptor modeling was used to evaluate dust source contributions on the exceedance days at HSY's air quality monitoring station in Mannerheimintie. According to the study the most significant source of PM{sub 10} particles in Mannerheimintie in 2010 was the dust sources related to traction control (winter-sanding and -salting of streets, pavement wear by studded tyres). Results from 2008 and 2009 show similar tendency. Also dust from construction sites contribute to airborne particle concentrations, timing of this source varies depending on the year. In 2010 particles from construction sites contributed to the exceedances that took place in late spring and early summer. Long-range transboundary air pollution also caused high concentrations of particles and contributed to some of the exceedances in 2008-2010. In late July and early August in 2010, long-range transboundary particles from the forest fires in Russia caused high particle concentrations in Helsinki metropolitan area and elsewhere in Southern Finland. Based on the results, the most significant means to reduce the airborne concentrations and to prevent the exceedance of the limit value are those that aim at mitigating street dust. In Helsinki, the means to

  14. An integrated approach to identify the origin of PM10 exceedances.

    Science.gov (United States)

    Amodio, M; Andriani, E; de Gennaro, G; Demarinis Loiotile, A; Di Gilio, A; Placentino, M C

    2012-09-01

    This study was aimed to the development of an integrated approach for the characterization of particulate matter (PM) pollution events in the South of Italy. PM(10) and PM(2.5) daily samples were collected from June to November 2008 at an urban background site located in Bari (Puglia Region, South of Italy). Meteorological data, particle size distributions and atmospheric dispersion conditions were also monitored in order to provide information concerning the different features of PM sources. The collected data allowed suggesting four indicators to characterize different PM(10) exceedances. PM(2.5)/PM(10) ratio, natural radioactivity, aerosol maps and back-trajectory analysis and particle distributions were considered in order to evaluate the contribution of local anthropogenic sources and to determine the different origins of intrusive air mass coming from long-range transport, such as African dust outbreaks and aerosol particles from Central and Eastern Europe. The obtained results were confirmed by applying principal component analysis to the number particle concentration dataset and by the chemical characterization of the samples (PM(10) and PM(2.5)). The integrated approach for PM study suggested in this paper can be useful to support the air quality managers for the development of cost-effective control strategies and the application of more suitable risk management approaches.

  15. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    Science.gov (United States)

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  16. Independent power project finance rating criteria

    International Nuclear Information System (INIS)

    Goldsmith, D.; Chew W.; Moulton, C.

    1992-01-01

    Continuing growth of project financing for non-utility generators in the US and abroad has led to growing focus on their credit strength. In general, the financings remain relatively risky and would likely be rated below investment grade, because of various factors: loose power purchase arrangements, poor match between power pricing and fuel costs, aggressive leverage, troubled operating performance. But S and P believes some projects have the credit strength to support investment grade ratings. As traditional financing markets for these projects --- bank lending and private placements with highly specialized institutional investors --- have contracted, project sponsors and developers are considering broader markets. These include institutional investors without specialized focus on power project finance. In these markets, distinctions among projects may lead to greater liquidity and efficiency in developing the pricing and terms under which projects can be financed. This paper reports that ratings are most appropriate for projects seeking permanent financing as they enter commercial operations. They also may be useful for projects which have been operating for some time and for some very strong projects which are raising construction financing. To guide both project developers and investors in project financing, S and P has developed the following approach for rating these types of financings

  17. A validity generalization procedure to test relations between intrinsic and extrinsic motivation and influence tactics.

    Science.gov (United States)

    Barbuto, John E; Moss, Jennifer A

    2006-08-01

    The relations of intrinsic and extrinsic motivation with use of consultative, legitimating, and pressure influence tactics were examined using validity generalization procedures. 5 to 7 field studies with cumulative samples exceeding 800 were used to test each relationship. Significance was found for relation between agents' intrinsic motivation and their use of consultative influence tactics and agents' extrinsic motivation and their use of legitimating influence tactics.

  18. The Psychopharmacology Algorithm Project at the Harvard South Shore Program: An Algorithm for Generalized Anxiety Disorder.

    Science.gov (United States)

    Abejuela, Harmony Raylen; Osser, David N

    2016-01-01

    This revision of previous algorithms for the pharmacotherapy of generalized anxiety disorder was developed by the Psychopharmacology Algorithm Project at the Harvard South Shore Program. Algorithms from 1999 and 2010 and associated references were reevaluated. Newer studies and reviews published from 2008-14 were obtained from PubMed and analyzed with a focus on their potential to justify changes in the recommendations. Exceptions to the main algorithm for special patient populations, such as women of childbearing potential, pregnant women, the elderly, and those with common medical and psychiatric comorbidities, were considered. Selective serotonin reuptake inhibitors (SSRIs) are still the basic first-line medication. Early alternatives include duloxetine, buspirone, hydroxyzine, pregabalin, or bupropion, in that order. If response is inadequate, then the second recommendation is to try a different SSRI. Additional alternatives now include benzodiazepines, venlafaxine, kava, and agomelatine. If the response to the second SSRI is unsatisfactory, then the recommendation is to try a serotonin-norepinephrine reuptake inhibitor (SNRI). Other alternatives to SSRIs and SNRIs for treatment-resistant or treatment-intolerant patients include tricyclic antidepressants, second-generation antipsychotics, and valproate. This revision of the GAD algorithm responds to issues raised by new treatments under development (such as pregabalin) and organizes the evidence systematically for practical clinical application.

  19. Polytope projects

    CERN Document Server

    Iordache, Octavian

    2013-01-01

    How do you know what works and what doesn't? This book contains case studies highlighting the power of polytope projects for complex problem solving. Any sort of combinational problem characterized by a large variety of possibly complex constructions and deconstructions based on simple building blocks can be studied in a similar way. Although the majority of case studies are related to chemistry, the method is general and equally applicable to other fields for engineering or science.

  20. CARA project

    International Nuclear Information System (INIS)

    Bergallo, Juan E.; Brasnarof, Daniel O.

    2000-01-01

    The CARA (Advanced Fuels for Argentine Reactors) Project successfully completed its first stage, phase one, last year. The performance of this fuel has been partially examined, using CNEA and CONUAR facilities and personnel. With the results obtained in this stage, determined by the corresponding tests and verification of the fuel behavior, the performance of the second stage started immediately afterwards. Works performed and results obtained during the development of the second stage are generally described in this paper. (author)

  1. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  2. Generalized spectral radius and its max algebra version

    Czech Academy of Sciences Publication Activity Database

    Müller, Vladimír; Peperko, A.

    2013-01-01

    Roč. 439, č. 4 (2013), s. 1006-1016 ISSN 0024-3795 R&D Projects: GA ČR GA201/09/0473; GA AV ČR IAA100190903 Institutional support: RVO:67985840 Keywords : generalized spectral radius * joint spectral radius * Berger-Wang formula Subject RIV: BA - General Mathematics Impact factor: 0.983, year: 2013 http://www.sciencedirect.com/science/article/pii/S0024379512007380

  3. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  4. Projection operator techniques in nonequilibrium statistical mechanics

    International Nuclear Information System (INIS)

    Grabert, H.

    1982-01-01

    This book is an introduction to the application of the projection operator technique to the statistical mechanics of irreversible processes. After a general introduction to the projection operator technique and statistical thermodynamics the Fokker-Planck and the master equation approach are described together with the response theory. Then, as applications the damped harmonic oscillator, simple fluids, and the spin relaxation are considered. (HSI)

  5. The large contribution of projected HFC emissions to future climate forcing.

    Science.gov (United States)

    Velders, Guus J M; Fahey, David W; Daniel, John S; McFarland, Mack; Andersen, Stephen O

    2009-07-07

    The consumption and emissions of hydrofluorocarbons (HFCs) are projected to increase substantially in the coming decades in response to regulation of ozone depleting gases under the Montreal Protocol. The projected increases result primarily from sustained growth in demand for refrigeration, air-conditioning (AC) and insulating foam products in developing countries assuming no new regulation of HFC consumption or emissions. New HFC scenarios are presented based on current hydrochlorofluorocarbon (HCFC) consumption in leading applications, patterns of replacements of HCFCs by HFCs in developed countries, and gross domestic product (GDP) growth. Global HFC emissions significantly exceed previous estimates after 2025 with developing country emissions as much as 800% greater than in developed countries in 2050. Global HFC emissions in 2050 are equivalent to 9-19% (CO(2)-eq. basis) of projected global CO(2) emissions in business-as-usual scenarios and contribute a radiative forcing equivalent to that from 6-13 years of CO(2) emissions near 2050. This percentage increases to 28-45% compared with projected CO(2) emissions in a 450-ppm CO(2) stabilization scenario. In a hypothetical scenario based on a global cap followed by 4% annual reductions in consumption, HFC radiative forcing is shown to peak and begin to decline before 2050.

  6. Migrant Education Projects. Projectos de Educacion Migrante. Oregon Migrant Education.

    Science.gov (United States)

    Oregon State Dept. of Education, Salem.

    Written in both English and Spanish, this booklet briefly summarizes the general concepts and requirements behind Title I Migrant activities for use by project personnel, parents, and others interested in those projects. After a brief discussion of project funding and definitions of commonly used terms, there is an outline of requirements which…

  7. R and D project and informatization

    International Nuclear Information System (INIS)

    1996-10-01

    This book deals with present situation and view of research and development project by industry, which includes general machinery industry, the steel industry, non ferrous metal industry, petrochemistry industry, auto industry, shipbuilding industry, aerospace engineering industry, daily supplies industry, fine chemistry industry, the ceramic industry, plate glass industry, biology life industry, electron industry, information industry, and semiconductor industry. It also describes project management of R and D and informatization of industry.367

  8. The International Arctic Seas Assessment Project

    International Nuclear Information System (INIS)

    Linsley, G.S.; Sjoeblom, K.L.

    1994-01-01

    The International Arctic Seas Assessment Project (IASAP) was initiated in 1993 to address widespread concern over the possible health and environmental impacts associated with the radioactive waste dumped into the shallow waters of the Arctic Seas. This article discusses the project with these general topics: A brief history of dumping activities; the international control system; perspectives on arctic Seas dumping; the IASAP aims and implementation; the IASAP work plan and progress. 2 figs

  9. General momentum theory for wind turbines at low tip speed ratios

    DEFF Research Database (Denmark)

    Sørensen, Jens Nørkær; van Kuik, Gijs A. M.

    2011-01-01

    General momentum theory is used to study the behaviour of the ‘classical’ free vortex wake model of Joukowsky. This model has recently attained considerable attention as it shows the possibility of achieving a power performance that greatly exceeds the Lanchester‐Betz limit for rotors running...... at low tip speed ratios. This behaviour is confirmed even when including the effect of a centre vortex, allowing azimuthal velocities and the associated radial pressure gradient to be taken into account in the axial momentum balance without any simplifying assumptions. It is shown that the most likely...

  10. Game analysis and benefit allocation in international projects among owner, supervisor and contractor

    Science.gov (United States)

    Ding, Hao; Wang, Yong; Guo, Sini; Xu, Xiaofeng; Che, Cheng

    2016-04-01

    International projects are different from general domestic ones. In order to analyse the differences, a tripartite game model is built up to describe the relationship among owner, supervisor and general contractor, and some measures are given for the owner to more effectively complete the project. In addition, a project schedule selection model is formulated and a new benefit allocation method is proposed by introducing a new modified Shapley value with weighted factor.

  11. Cascade Error Projection Learning Algorithm

    Science.gov (United States)

    Duong, T. A.; Stubberud, A. R.; Daud, T.

    1995-01-01

    A detailed mathematical analysis is presented for a new learning algorithm termed cascade error projection (CEP) and a general learning frame work. This frame work can be used to obtain the cascade correlation learning algorithm by choosing a particular set of parameters.

  12. Leadership success within disaster restoration projects.

    Science.gov (United States)

    Rapp, Randy R; Baroudi, Bassam

    2014-01-01

    Successful project managers draw their performance from essential leadership traits, as guided by their core values.Within disaster recovery, contractors who mitigate, repair, and reconstruct the built environment are often faced with challenges exceeding the norm. The effective leader is commonly expected to consider stakeholder motivations within distressing situations as well as other external and environmental factors when seeking to lead the project team to successful outcomes. This research is most concerned with leadership within the context of disaster restoration of the built environment. Its stimulus comes from the Restoration Industry Association (RIA)'s efforts to highlight leadership traits and core values for its Certified Restorer Body of Knowledge but would be of value to others associated with disaster recovery operations. Among organizations whose membership includes thousands of practitioners who restore and reconstruct the built environment after disasters, the RIA is the only one yet to formally and substantially research which core values and leader traits are deemed critical for the success of efforts to manage the means and methods applied on recovery job sites. Forty-six seasoned disaster restoration industry project professionals voluntarily responded to a survey questionnaire that sought their opinions about the traits and core values that they consider most important for successful disaster restoration project leadership. The most important leader traits were effective communication, professional competence, and leadership by example. The most important restoration industry values were integrity, compassion, and trustworthiness. The recognized imperative of compassion was unexpected in light of stereotypes often associated with construction-related contractors. This and other findings permit disaster response and recovery stakeholders to better understand qualities they should wish to see in leaders of contractor organizations, which

  13. An algorithm for the construction of substitution box for block ciphers based on projective general linear group

    Directory of Open Access Journals (Sweden)

    Anas Altaleb

    2017-03-01

    Full Text Available The aim of this work is to synthesize 8*8 substitution boxes (S-boxes for block ciphers. The confusion creating potential of an S-box depends on its construction technique. In the first step, we have applied the algebraic action of the projective general linear group PGL(2,GF(28 on Galois field GF(28. In step 2 we have used the permutations of the symmetric group S256 to construct new kind of S-boxes. To explain the proposed extension scheme, we have given an example and constructed one new S-box. The strength of the extended S-box is computed, and an insight is given to calculate the confusion-creating potency. To analyze the security of the S-box some popular algebraic and statistical attacks are performed as well. The proposed S-box has been analyzed by bit independent criterion, linear approximation probability test, non-linearity test, strict avalanche criterion, differential approximation probability test, and majority logic criterion. A comparison of the proposed S-box with existing S-boxes shows that the analyses of the extended S-box are comparatively better.

  14. Special Project Examination in Integrated Science - Ordinary Level.

    Science.gov (United States)

    Wimpenny, David

    A science achievement test for the General Certificate of Education (GCE, England) was developed for students enrolled in the curriculum of the Schools Council Integrated Science Project. This document contains discussions of the testing program and a copy of the 1973 test. After an overview of the curriculum project and issues related to…

  15. 42 CFR 403.206 - General standards for Medicare supplemental policies.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false General standards for Medicare supplemental policies. 403.206 Section 403.206 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Medicare Supplemental Policies...

  16. Project safety studies - nuclear waste management (PSE)

    International Nuclear Information System (INIS)

    1981-10-01

    The project 'Safety Studies-Nuclear Waste Management' (PSE) is a research project performed by order of the Federal Minister for Research and Technology, the general purpose of which is to deepen and ensure the understanding of the safety aspects of the nuclear waste management and to prepare a risk analysis which will have to be established in the future. Owing to this the project is part of a series of projects which serve the further development of the concept of nuclear waste management and its safety, and which are set up in such a way as to accompany the realization of that concept. This report contains the results of the first stage of the project from 1978 to mid-1981. (orig./RW) [de

  17. An alternative projection model of future nuclear capacity

    International Nuclear Information System (INIS)

    Takei, Mitsuo

    1985-01-01

    There is generally a high degree of uncertainty involved in the projection of growth of any energy source, especially when the projection extends 50 years ahead. The 1982 OECD/NEA Report, 'Nuclear Energy and its Fuel Cycle Prospect to 2025' notes the downturn in past projections of nuclear capacity over the past decade. It is obvious that rapidly changing conditions have affected overall worldwide energy and economic growth and the field of nuclear power has been subject to changes specific to itself. These have caused past projections to become obsolete and therefore it would seem necessary to implement a new projection method to improve the accuracy of present forecasting. (author)

  18. Collaboration with general practitioners : preferences of medical specialists - a qualitative study

    NARCIS (Netherlands)

    Berendsen, Annette J.; Benneker, Wim H. G. M.; Schuling, Jan; Rijkers-Koorn, Nienke; Slaets, Joris P. J.; Meyboom-de Jong, Betty

    2006-01-01

    Background: Collaboration between general practitioners (GPs) and specialists has been the focus of many collaborative care projects during the past decade. Unfortunately, quite a number of these projects failed. This raises the question of what motivates medical specialists to initiate and continue

  19. On polars of mixed projection bodies

    Science.gov (United States)

    Zhao, Chang-Jian; Leng, Gang-Song

    2006-04-01

    Recently, Lutwak established general Minkowski inequality, Brunn-Minkowski inequality and Aleksandrov-Fenchel inequality for mixed projection bodies. In this paper, following Lutwak, we established their polar forms. As applications, we prove some interrelated results.

  20. Balancing research and organizational capacity building in front-end project design

    DEFF Research Database (Denmark)

    Hjortsø, Carsten Nico Portefée; Meilby, Henrik

    2013-01-01

    is more complex. We identify 11 specific factors influencing front-end project management related to structure, process and relationship, and we theorize about how these factors influence the choice between research and more general capacity development activities. Copyright © 2013 John Wiley & Sons, Ltd......, but in order for partnerships to comply with general governance-level recommendations, a better understanding is needed of how specific context-dependent factors influence the development and execution of projects. In this article, we aim to contribute to the understanding of factors influencing the design...... phase of RCB partnerships and examine how they influence the balance between performing collaborative research and developing general organizational capacity. Data collection was based on a survey (n = 25), and individual interviews and focus group discussions with 17 Danish project managers from...

  1. The Japanese approach to financing LNG projects

    International Nuclear Information System (INIS)

    Aoki, Wataru

    1995-01-01

    The Japanese approach approach to financing LNG project has been what could be called a combined purchase and finance system which has been arranged mainly at the initiative of japan's Sogo Shosh (general trading companies) with the support of japanese governmental financial agencies and a purchase commitment from japanese utilities. In the QATARGAS project, despite it being the first greenfield LNG project in decade since North West Shelf Australia LNG project, financing for the LNG plant phase has been successfully arranged through Japanese financing. The structuring of the financial facilities for the QATARGAS project seems to have lessons for future development of the next generation of greenfield LNG projects. Discharge of the parties' liability, proper sharing of the risk burden and reconfirmation of the spirit of mutual understanding and trust among the parties concerned are key factors for the success of any new LNG project in the future. (Author)

  2. Breckinridge Project, initial effort

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1982-09-01

    Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.

  3. Was it worthwhile? Where have the benefits of rooftop solar photovoltaic generation exceeded the cost?

    Science.gov (United States)

    Vaishnav, Parth; Horner, Nathaniel; Azevedo, Inês L.

    2017-09-01

    We estimate the lifetime magnitude and distribution of the private and public benefits and costs of currently installed distributed solar PV systems in the United States. Using data for recently-installed systems, we estimate the balance of benefits and costs associated with installing a non-utility solar PV system today. We also study the geographical distribution of the various subsidies that are made available to owners of rooftop solar PV systems, and compare it to distributions of population and income. We find that, after accounting for federal subsidies and local rebates and assuming a discount rate of 7%, the private benefits of new installations will exceed private costs only in seven of the 19 states for which we have data and only if customers can sell excess power to the electric grid at the retail price. These states are characterized by abundant sunshine (California, Texas and Nevada) or by high electricity prices (New York). Public benefits from reduced air pollution and climate change impact exceed the costs of the various subsidies offered system owners for less than 10% of the systems installed, even assuming a 2% discount rate. Subsidies flowed disproportionately to counties with higher median incomes in 2006. In 2014, the distribution of subsidies was closer to that of population income, but subsidies still flowed disproportionately to the better-off. The total, upfront, subsidy per kilowatt of installed capacity has fallen from 5200 in 2006 to 1400 in 2014, but the absolute magnitude of subsidy has soared as installed capacity has grown explosively. We see considerable differences in the balance of costs and benefits even within states, indicating that local factors such as system price and solar resource are important, and that policies (e.g. net metering) could be made more efficient by taking local conditions into account.

  4. Most American Academy of Orthopaedic Surgeons' online patient education material exceeds average patient reading level.

    Science.gov (United States)

    Eltorai, Adam E M; Sharma, Pranav; Wang, Jing; Daniels, Alan H

    2015-04-01

    Advancing health literacy has the potential to improve patient outcomes. The American Academy of Orthopaedic Surgeons' (AAOS) online patient education materials serve as a tool to improve health literacy for orthopaedic patients; however, it is unknown whether the materials currently meet the National Institutes of Health/American Medical Association's recommended sixth grade readability guidelines for health information or the mean US adult reading level of eighth grade. The purposes of this study were (1) to evaluate the mean grade level readability of online AAOS patient education materials; and (2) to determine what proportion of the online materials exceeded recommended (sixth grade) and mean US (eighth grade) reading level. Reading grade levels for 99.6% (260 of 261) of the online patient education entries from the AAOS were analyzed using the Flesch-Kincaid formula built into Microsoft Word software. Mean grade level readability of the AAOS patient education materials was 9.2 (SD ± 1.6). Two hundred fifty-one of the 260 articles (97%) had a readability score above the sixth grade level. The readability of the AAOS articles exceeded the sixth grade level by an average of 3.2 grade levels. Of the 260 articles, 210 (81%) had a readability score above the eighth grade level, which is the average reading level of US adults. Most of the online patient education materials from the AAOS had readability levels that are far too advanced for many patients to comprehend. Efforts to adjust the readability of online education materials to the needs of the audience may improve the health literacy of orthopaedic patients. Patient education materials can be made more comprehensible through use of simpler terms, shorter sentences, and the addition of pictures. More broadly, all health websites, not just those of the AAOS, should aspire to be comprehensible to the typical reader.

  5. THE PROACTIVE MANAGEMENT MODEL OF STRATEGIC DEVELOPMENT PROJECT ON THE ENERGY SUPPLY COMPANIES IN A TURBULENT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Михайло Збишекович ДОМБРОВСЬКИЙ

    2017-03-01

    Full Text Available A methodical approach of proactive project management model with the estimate (prediction deviation of actual results from planned at each control step is proposed. Deviation of actual results from the project planned, which takes place in the management of the energy company transformation project, as a result of action under uncertainty, determines the acceleration of work over the project plan. Implementation the scope of work, which exceeds the plan, as result of overspending of resources and budget, disrupting the stability of the project as a system. The graphic model helps to form the "corridor" tolerance based resource reserve, and the implementation of the project work is carried out according to the extension concept. Clarification allowable deviation area allows improving the model of project proactive management for each of the next execution step. Project management quality is improved by reducing the time of decision-making and increase the sustainability and efficiency by substantially reducing deviations. The conclusions about the benefits of the assessment of works and project resources balance, by using the proactive management model, which allows comparing variants of works dynamics, to implement the search for the best solution to a predetermined set of admissible, have been made.

  6. Host country attractiveness for CDM non-sink projects

    International Nuclear Information System (INIS)

    Jung, Martina

    2006-01-01

    In the present study, CDM host countries are classified according to their attractiveness for CDM non-sink projects by using cluster analysis. The attractiveness of host countries for CDM non-sink projects is described by three indicators: mitigation potential, institutional CDM capacity and general investment climate. The results suggest that only a small proportion of potential host countries will attract most of the CDM investment. The CDM (non-sink) stars are China, India, Brazil, Argentina, Mexico, South Africa, Indonesia and Thailand. They are followed by attractive countries like Costa Rica, Trinidad and Tobago, Mongolia, Panama, and Chile. While most of the promising CDM host countries are located in Latin America and Asia, the general attractiveness of African host countries is relatively low (with the exception of South Africa). Policy implications of this rather inequitable geographical distribution of CDM project activities are discussed briefly

  7. The influence of the Danube-Odra-Elbe water canal project on the geobiocoenoses of floodplain forests (Czech Republic

    Directory of Open Access Journals (Sweden)

    Ivo Machar

    2010-01-01

    Full Text Available This arcticle deals with influence of the proposed Danube-Odra-Elbe (DOL water canal on the floodplain forests in the Czech Republic. The project of the DOL water canal is evaluated with using GIS methods and reference assessment of environmental effects. Biogeographic differentiation of the landscape in a biogeocenological concept have been also utilized in this paper. The presented paper has shown the possibilities of use of the GIS analysis for the assessment of the assumed effect of the DOL project on the hydrological regime of floodplain forests. It has been proven that this method is much more efficient in objectivizing the presupposed influences of the DOL canal on the water regime of floodplain forests than the previous assessments. The method employed in this paper for the purposes of the preliminary percentage quantification of the extent of the hydrological in­fluen­ce on individual types of geobiocoenoses of floodplain forests is used generally for the purposes of the environmental assessment of effects on investment plans concerning the landscape (the so-called EIA. It is clear that the assessment of the influences of the DOL project on floodplain forest geobiocoenoses primarily concerns the response of vegetation to changes in the soil moisture regime, which can be compared to the amount of data material (for a summary see PRAX et al., 2008. Results indicate that the potential construction of the DOL canal would significantly, i.e. with an influence value exceeding 50 %, affect 634 km2 of the area of inundations in lowland floodplains in the Czech Republic. Results are discussed in the frame of knowledge about water regime of floodplain forests ecosystems.

  8. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  9. Agro-climate Projections for a Warming Alaska

    Science.gov (United States)

    Lader, R.; Walsh, J. E.; Bhatt, U. S.; Bieniek, P.

    2017-12-01

    In the context of greenhouse warming, agro-meteorological indices suggest widespread disruption to current food supply chains during the coming decades. Much of the western United States is projected to have more dry days, and the southern states are likely to experience greater plant heat stress. Considering these difficulties, it could become necessary for more northerly locations, including Alaska, to increase agricultural production to support local communities and offset supply shortages. This study employs multiple dynamically downscaled regional climate model simulations from the CMIP5 to investigate projected changes to agro-climate conditions across Alaska. The metric used here, the start-of-field operations index (SFO), identifies the date during which the sum of daily average temperature, starting from January 1st and excluding negative values, exceeds 200 ˚C. Using the current trajectory of greenhouse radiative forcing, RCP 8.5, this study indicates a doubling to 71,960 km2 of Alaska land area that meets the required thermal accumulation for crop production when comparing a historical period (1981-2010) to the future (2071-2100). The SFO shows a correlation coefficient of 0.91 with the independently produced green-up index for Fairbanks from 1981-2010. Among the land areas that currently reach the necessary thermal accumulation, there is a projected increase in growing season length (63-82 days), earlier date of last spring frost (28-48 days), and later date of first autumn frost (24-47 days) across the five USDA Census of Agriculture areas for Alaska. Both an average statewide decrease of annual frost days (71 fewer), and an increase in days with extreme warmth (28 more) are also projected.

  10. THE QUALITY IMPORTANCE IN A PROJECT MANAGEMENT COMPLEXITY ENVIRONMENT

    OpenAIRE

    Adrian UNGUREANU; Anca VARGA

    2009-01-01

    A project is a temporary endeaver undertaken to creat a unique product, service or result. The temporary nature of project indicates a definite beginning and end. The end is reached when the project’s objectives have been achieved or when the project is terminated becouse its objectives will not or cannot be met, when the need for the project no longer exist. Temporary does not necessarily mean short in duration. Temporary does not generally apply to the product, service, or result created by...

  11. Generalizing optical geometry

    International Nuclear Information System (INIS)

    Jonsson, Rickard; Westman, Hans

    2006-01-01

    We show that by employing the standard projected curvature as a measure of spatial curvature, we can make a certain generalization of optical geometry (Abramowicz M A and Lasota J-P 1997 Class. Quantum Grav. A 14 23-30). This generalization applies to any spacetime that admits a hypersurface orthogonal shearfree congruence of worldlines. This is a somewhat larger class of spacetimes than the conformally static spacetimes assumed in standard optical geometry. In the generalized optical geometry, which in the generic case is time dependent, photons move with unit speed along spatial geodesics and the sideways force experienced by a particle following a spatially straight line is independent of the velocity. Also gyroscopes moving along spatial geodesics do not precess (relative to the forward direction). Gyroscopes that follow a curved spatial trajectory precess according to a very simple law of three-rotation. We also present an inertial force formalism in coordinate representation for this generalization. Furthermore, we show that by employing a new sense of spatial curvature (Jonsson R 2006 Class. Quantum Grav. 23 1)) closely connected to Fermat's principle, we can make a more extensive generalization of optical geometry that applies to arbitrary spacetimes. In general this optical geometry will be time dependent, but still geodesic photons move with unit speed and follow lines that are spatially straight in the new sense. Also, the sideways experienced (comoving) force on a test particle following a line that is straight in the new sense will be independent of the velocity

  12. [Project HRANAFINA--Croatian anatomical and physiological terminology].

    Science.gov (United States)

    Vodanović, Marin

    2012-01-01

    HRANAFINA--Croatian Anatomical and Physiological Terminology is a project of the University of Zagreb School of Dental Medicine funded by the Croatian Science Foundation. It is performed in cooperation with other Croatian universities with medical schools. This project has a two-pronged aim: firstly, building of Croatian anatomical and physiological terminology and secondly, Croatian anatomical and physiological terminology usage popularization between health professionals, medical students, scientists and translators. Internationally recognized experts from Croatian universities with medical faculties and linguistics experts are involved in the project. All project activities are coordinated in agreement with the National Coordinator for Development of Croatian Professional Terminology. The project enhances Croatian professional terminology and Croatian language in general, increases competitiveness of Croatian scientists on international level and facilitates the involvement of Croatian scientists, health care providers and medical students in European projects.

  13. A model for a career in a specialty of general surgery: One surgeon's opinion.

    Science.gov (United States)

    Ko, Bona; McHenry, Christopher R

    2018-01-01

    The integration of general and endocrine surgery was studied as a potential career model for fellowship trained general surgeons. Case logs collected from 1991-2016 and academic milestones were examined for a single general surgeon with a focused interest in endocrine surgery. Operations were categorized using CPT codes and the 2017 ACGME "Major Case Categories" and there frequencies were determined. 10,324 operations were performed on 8209 patients. 412.9 ± 84.9 operations were performed yearly including 279.3 ± 42.7 general and 133.7 ± 65.5 endocrine operations. A high-volume endocrine surgery practice and a rank of tenured professor were achieved by years 11 and 13, respectively. At year 25, the frequency of endocrine operations exceeded general surgery operations. Maintaining a foundation in broad-based general surgery with a specialty focus is a sustainable career model. Residents and fellows can use the model to help plan their careers with realistic expectations. Copyright © 2017. Published by Elsevier Inc.

  14. Confident and "wrong"? Towards a mindful use of visuals in project portfolio decisions

    DEFF Research Database (Denmark)

    Geraldi, Joana; Arlt, Mario

    Portfolios exhibit a degree of complexity that easily exceeds the human ability to achieve optimal decisions through mere intuition. Making sense of this complexity involves a wise use of larger quantity of data. Visuals can help the analysis of more data through different perspectives. Yet......, visuals can also aggravate the challenges involved in portfolio decisions. Inspired by Weick and Sufcliffe’s concept of mindfulness, we conducted an experiment with 204 participants to explore how to use visual mindfully in project portfolio context. The results suggest that use of purposeful and familiar...

  15. Photovoltaic demonstration projects 2

    Energy Technology Data Exchange (ETDEWEB)

    Gillett, W B; Hacker, R J [Halcrow (William) and Partners, Swindon (UK); Kaut, W [eds.

    1989-01-01

    This book, the proceedings of the third Photovoltaic Contractors' Meeting organised by the Commission of the European Communities, Directorate-General for Energy provides an overview of the photovoltaic demonstration projects which have been supported by the Energy Directorate of the Commission of the European Communities since 1983. It includes reports by each of the contractors who submitted proposals in 1983, 1984 and 1985, describing progress with their projects. The different technologies which are being demonstrated concern the modules, the cabling of the array, structure design, storage strategy and power conditioning. The various applications include powering of houses, villages, recreation centres, water desalination, communications, dairy farms, water pumping and warning systems. (author).

  16. Project management in nuclear equipment manufacture

    International Nuclear Information System (INIS)

    Liu Jiancheng

    2005-01-01

    The completion of the management organization shall be firstly considered in project management for a nuclear power plant. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press usr bearing equipment, and the vice general manager takes responsibility for the quality, technology and schedule related with the manufacture of the equipment, and organizes the organization department for the audit. The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel. The manufacture schedule shall be prepared to ensure the implementation feasibility, process continuity and flexibility. The schedule shall be followed and monitored for the whole process, to check and feedback the implementation. (authors)

  17. Egg Yolk Lecithin: A Biochemical Laboratory Project

    Science.gov (United States)

    White, Bernard J.; And Others

    1974-01-01

    Describes an undergraduate laboratory project involving lecithin which integrates two general aspects of lipid methodology: chromatographic techniques and use of enzymes specificity to obtain structural information. (Author/SLH)

  18. The upper Rhine waste heat project

    International Nuclear Information System (INIS)

    Schikarski, W.

    1977-03-01

    The tasks and targets of the project are: 1) Determination of the parameters relevant for an assessment of consequences, e.g.: General influences on weather and climate, anthropogenic influences on weather and climate, effects, affected systems, boundary conditions, anthropogenic changes in boundary conditions. 2) Developing a method of evaluation. 3) Establishing a sensitivity model and carrying out analyses. 4) Determining interface parameters which relate this project to other projects. 5) Summary of the findings and preparation of the main study. The cooperating institutions are: UBA, GfK, KFA, Deutscher Wetterdienst, University Bonn (Inst. f. Meteorology), Bonnenberg + Drescher GmbH, ISI (FhG Karlsruhe). (orig./HP) [de

  19. Problem-based and project-oriented learning

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Teodorescu, Remus; Chen, Zhe

    2005-01-01

    . Generally, the content of the curriculum should be more expanded without extra study time. This paper presents a teaching approach, which makes it possible very fast for the students to obtain in-depth skills into new research areas, and this method is the problem-oriented and project-based learning....... In this paper the necessary skills for power electronic engineers are outlined that is followed up by a description on how the problem-oriented and project-based learning are implemented. A complete curriculum in power electronics and drives at Aalborg University is presented where different power electronics...... related projects at different study levels also are presented....

  20. 13 CFR 130.610 - General terms.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false General terms. 130.610 Section 130.610 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS DEVELOPMENT CENTERS... responsibilities of the recipient organization and SBA, the scope of the project to be funded, and the budget of...

  1. Effect of participation in the Fadama–II project on Participants' socio ...

    African Journals Online (AJOL)

    For most respondents, the socioeconomic status changed positively following participation in the project. Majority of the respondents in the study area participated actively in fadama meetings and other activities involved in project. Benefits derived from taking part in the project were generally high for most respondents (95.5 ...

  2. Perils of project development on public land open to mining

    International Nuclear Information System (INIS)

    Jacobs, W.R.

    1991-01-01

    Conducting a government project on public land open to the general mining laws can result in added costs, legal entanglements, schedule uncertainties, and the potential for unanticipated safety issues and concerns due to interactions with mining claimants. Planning for such projects must include a careful assessment of not only land access needs and restrictions, but also possible scenarios for conflict with activities authorized under the general mining laws throughout the life of the project. It is essential to have a thorough knowledge of the applicable mining laws and how they are currently being interpreted and applied by the responsible regulatory authorities and land managers. The Yucca Mountain Project approach to land access, problems encountered with mining claims filed under the Mining Law of 1872, and the lessons learned from these experiences are discussed in this paper

  3. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  4. Gentilly-2 refurbishment pre-project

    International Nuclear Information System (INIS)

    Pageau, Rene; Doyon, Martial; Rheaume, M.R.

    2002-01-01

    The conceptual design life of Gentilly-2 station is 30 years and the station was put in service in 1982. Hydro-Quebec has initiated a project to assess the refurbishment of the station in the horizon 2008-2010 and for an expected life extension of 25 years. The reactor has been successfully operated since its first full-power operation in early 80's, nearly 20 years ago. Although the overall performance of Gentilly-2 continues to be very good, it is reasonable to expect that age-related degradation of key plant components will have an increasing impact on operations as the plant continues to age. The replacement of the reactor channels component is required around 2008-2009. The replacement of the reactor tubes is a major activity and it is necessary to assess the capability of the station to operate safely and reliably for a an extended period of 25 years bringing the design life of the station to over 50 years. The challenges associated with extended life operation until at least 2030-33 horizon are to maintain the margin of safety for plant operations by ensuring reliability of safety-related systems, to reduce plant unavailability due to age-related component failures, and to minimize the costs for repairs and replacement of aging components. As shown on the next figure, the overall project is expected to spread over an 8 years period starting in 2001. A project feasibility study (phase-1) of four (4) years has been planned to assess the plant condition and to make an overall safety review. This project phase will confirm the economical viability of extended operation. A period of thirty-nine (39) months would be necessary for the procurement and manufacturing of all the reactor components, and for the engineering work related to safety and economic improvements. Reactor channel replacement is planned for an outage not exceeding 18 months. (author)

  5. Directives and general design requirements for a small PWR

    International Nuclear Information System (INIS)

    Arrieta, L.A.

    1992-08-01

    A proposal of directives and general requirements for the development of a small PWR conceptual design is presented. These directives address the main safety, performance and economic design aspects. The purpose is to use this work as a base for a wide discussion, involving all project participants, culminating with the definition of the final directives and general requirements. (author)

  6. Project management and administration of research and development

    International Nuclear Information System (INIS)

    Kim, Guk; Lee, Sang Bok; Eom, Ju Tae; An, Ha Eil

    1997-07-01

    This book mentions project and project management with project from production system of view, history of project management, writing way of network with definition and symbol of network, principle for drawing of network, draw up of network, I-J network and PDM network, general conception of PERT/CPM on definition of PERT, definition of CPM, comparison of PERT/CPM, discussion of PERT/CPM, WBS, work order and network, PDM calculation, cost management, reduction of construction time, R and D such as operation and R and D and analysis on R and D, system explanation of Nex-Pert.

  7. Mathematics authentic assessment on statistics learning: the case for student mini projects

    Science.gov (United States)

    Fauziah, D.; Mardiyana; Saputro, D. R. S.

    2018-03-01

    Mathematics authentic assessment is a form of meaningful measurement of student learning outcomes for the sphere of attitude, skill and knowledge in mathematics. The construction of attitude, skill and knowledge achieved through the fulfilment of tasks which involve active and creative role of the students. One type of authentic assessment is student mini projects, started from planning, data collecting, organizing, processing, analysing and presenting the data. The purpose of this research is to learn the process of using authentic assessments on statistics learning which is conducted by teachers and to discuss specifically the use of mini projects to improving students’ learning in the school of Surakarta. This research is an action research, where the data collected through the results of the assessments rubric of student mini projects. The result of data analysis shows that the average score of rubric of student mini projects result is 82 with 96% classical completeness. This study shows that the application of authentic assessment can improve students’ mathematics learning outcomes. Findings showed that teachers and students participate actively during teaching and learning process, both inside and outside of the school. Student mini projects also provide opportunities to interact with other people in the real context while collecting information and giving presentation to the community. Additionally, students are able to exceed more on the process of statistics learning using authentic assessment.

  8. Did European temperatures in 1540 exceed present-day records?

    Science.gov (United States)

    Orth, Rene; Vogel, Martha M.; Luterbacher, Jürg; Pfister, Christian; Seneviratne, Sonia I.

    2017-04-01

    There is strong evidence that the year 1540 was exceptionally dry and warm in Central Europe. Here we infer 1540 summer temperatures from the number of dry days (NDDs) in spring (March-May) and summer (June-August) in 1540 derived from historical documentary evidence published elsewhere, and compare our estimates with present-day temperatures. We translate the NDD values into temperature distributions using a linear relationship between modeled temperature and NDD from a 3000 year pre-industrial control simulation with the Community Earth System Model (CESM). Our results show medium confidence that summer mean temperatures (T JJA) and maximum temperatures (TXx) in Central Europe in 1540 were warmer than the respective present-day mean summer temperatures (assessed between 1966-2015). The model-based reconstruction suggests further that with a probability of 40%-70%, the highest daily temperatures in 1540 were even warmer than in 2003, while there is at most a 20% probability that the 1540 mean summer temperature was warmer than that of 2003 in Central Europe. As with other state-of-the-art analyses, the uncertainty of the reconstructed 1540 summer weather in this study is considerable, for instance as extrapolation is required because 1540-like events are not captured by the employed Earth system model (ESM), and neither by other ESMs. However, in addition to paleoclimatological approaches we introduce here an independent methodology to estimate 1540 temperatures, and contribute consequently to a reduced overall uncertainty in the analysis of this event. The characterization of such events and the related climate system functioning is particularly relevant in the context of global warming and the corresponding increase of extreme heat wave magnitude and occurrence frequency. Orth, R., M.M. Vogel, J. Luterbacher, C. Pfister, and S.I. Seneviratne, (2016): Did European temperatures in 1540 exceed present-day records? Env. Res. Lett., 11, 114021, doi: 10.1088/1748-9326/11/11/114021

  9. General Education: Learning from the Past, Preparing for the Future

    Science.gov (United States)

    Gersten, Karen S.

    2012-01-01

    This article explores the widening gap between business and societal needs and current general education curricula. Research is presented that documents gaps between projected needs of industry and current practices in postsecondary education, especially in the general education areas. Positive efforts to close the gap are highlighted. Changing…

  10. The Director-General visits the ATLAS construction site at Point 1

    CERN Multimedia

    Patrice Loiez

    1998-01-01

    Photo 05 : Claude Guitton (left), Project Manager for the EDF/Knight Piesold joint venture responsible for design and site supervision for LHC civil engineering at Point 1 takes the Director-General Chris Llewellyn Smith and LHC Project Leader Lyn Evans on a tour of the site.

  11. What could have caused pre-industrial biomass burning emissions to exceed current rates?

    Directory of Open Access Journals (Sweden)

    G. R. van der Werf

    2013-01-01

    Full Text Available Recent studies based on trace gas mixing ratios in ice cores and charcoal data indicate that biomass burning emissions over the past millennium exceeded contemporary emissions by up to a factor of 4 for certain time periods. This is surprising because various sources of biomass burning are linked with population density, which has increased over the past centuries. We have analysed how emissions from several landscape biomass burning sources could have fluctuated to yield emissions that are in correspondence with recent results based on ice core mixing ratios of carbon monoxide (CO and its isotopic signature measured at South Pole station (SPO. Based on estimates of contemporary landscape fire emissions and the TM5 chemical transport model driven by present-day atmospheric transport and OH concentrations, we found that CO mixing ratios at SPO are more sensitive to emissions from South America and Australia than from Africa, and are relatively insensitive to emissions from the Northern Hemisphere. We then explored how various landscape biomass burning sources may have varied over the past centuries and what the resulting emissions and corresponding CO mixing ratio at SPO would be, using population density variations to reconstruct sources driven by humans (e.g., fuelwood burning and a new model to relate savanna emissions to changes in fire return times. We found that to match the observed ice core CO data, all savannas in the Southern Hemisphere had to burn annually, or bi-annually in combination with deforestation and slash and burn agriculture exceeding current levels, despite much lower population densities and lack of machinery to aid the deforestation process. While possible, these scenarios are unlikely and in conflict with current literature. However, we do show the large potential for increased emissions from savannas in a pre-industrial world. This is mainly because in the past, fuel beds were probably less fragmented compared to the

  12. Organization and change in general practice

    DEFF Research Database (Denmark)

    Andersen, John Sahl

    Organization and change in general practice Abstract for a symposium at Nordic Congress for General Practice Thursday 14 May at 15.30-17.00 General practice is under increasing pressure to assume new tasks, adopt new technologies and engage in new organizational structures. However, in a field...... of multiple actors and concerns such visions are rarely straightforward to realize. This symposium explores the significance of various organizational, cultural and regulative features of general practice in relation to proposals for change in the sector. Presentations: Thorkil Thorsen, Marius Kousgaard...... primary care. One purpose is to give more freedom to the patients to choose care-givers. Another is to create a more competitive health care system. These reforms will be evaluated in a research project to be presented. Chairman: John Sahl Andersen MESH-terms: Delivery of Health Care, Health Care Reform...

  13. Scientific projection paper for genetics

    International Nuclear Information System (INIS)

    Grahn, D.

    1980-01-01

    This Projection Paper is in two parts. The first is a general discussion of current knowledge and the present basis of radiation protection policy, the rather dismal prospects in the foreseeable future of getting realistic estimates of the human impact of radiation-induced mutation, and some general remarks about radiation standards and research strategy. The second part deals with specific research projects that might increase basic knowledge and narrow the gap between what is needed and what is known. We should emphasize at the outset that, of all environmental hazards, radiation is one whose genetic effects are best understood. There is good information on the dose-response curve, on the effects of dose rate and fractionation, and on the differential sensitivity of different ages, sexes and cell stages. This includes a great deal of knowledge of one organism closely related to man, the mouse. This information has been the basis for risk assessment and for safety standards that are widely accepted as solidly based

  14. Results of nine Connecticut Cancer Partnership implementation projects.

    Science.gov (United States)

    Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu

    2012-01-01

    The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.

  15. 26 CFR 1.593-2 - Additions to reserve for bad debts where surplus, reserves, and undivided profits equal or exceed...

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 7 2010-04-01 2010-04-01 true Additions to reserve for bad debts where surplus... bad debts where surplus, reserves, and undivided profits equal or exceed 12 percent of deposits or... profits, and reserves at the beginning of the taxable year, a reasonable addition to the reserve for bad...

  16. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    Directory of Open Access Journals (Sweden)

    Argaw Tarekegn Gurmu

    2016-09-01

    Full Text Available This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.

  17. Cincinnati, Ohio: Two environmental projects in danger of being misunderstood

    International Nuclear Information System (INIS)

    DeJong, K.A.

    1992-01-01

    The Mill Creek Flood Control and the Fernald Decontamination projects are major environmental issues in the (sub)urban setting of Cincinnati. Flood control of the Mill Creek, a tributary of the Ohio River that bisects Cincinnati, was initiated after a flood with $3 million damage in 1959. Its costs were originally estimated at $42 million (1970) and later at $106 million (1976); $110 million has now been spent and the total cost may reach $313 million in the year 2000 (1992 dollars). Benefit/cost ratios ranging between 2.6:1 and 1.6:1 were used to rationalize this project. Flood frequency of the Mill Creek will be discussed. Decontamination of the suburban Fernald site follows manufacturing of nuclear materials from 1953 until 1989. 149 tons of uranium and thorium wastes were released in the air, 83.5 tons to the Greater Miami River and 5,975 tons were placed in pits, all of which are leaking. The cost to cleanup up the local contamination may exceed $10 billion over a time period of 20--30 years, and the calculation of benefit/cost ratios is complex. The hydrology of the Fernald site will be examined. These two environmental projects are run respectively by the Army Corps of Engineers and the US Department of Energy through large industrial contractors. The projects are in danger of becoming like projects of the ''Military-Industrial Complex'' because of the public's ignorance or misinterpretation of the facts; the argument of public safety, and the huge costs. The role of geologists should include edification of the public about the geological aspects of environmental projects

  18. Regional climate projections for the MENA-CORDEX domain: analysis of projected temperature and precipitation changes

    Science.gov (United States)

    Hänsler, Andreas; Weber, Torsten; Eggert, Bastian; Saeed, Fahad; Jacob, Daniela

    2014-05-01

    Within the CORDEX initiative a multi-model suite of regionalized climate change information will be made available for several regions of the world. The German Climate Service Center (CSC) is taking part in this initiative by applying the regional climate model REMO to downscale global climate projections of different coupled general circulation models (GCMs) for several CORDEX domains. Also for the MENA-CORDEX domain, a set of regional climate change projections has been established at the CSC by downscaling CMIP5 projections of the Max-Planck-Institute Earth System Model (MPI-ESM) for the scenarios RCP4.5 and RCP8.5 with the regional model REMO for the time period from 1950 to 2100 to a horizontal resolution of 0.44 degree. In this study we investigate projected changes in future climate conditions over the domain towards the end of the 21st century. Focus in the analysis is given to projected changes in the temperature and rainfall characteristics and their differences for the two scenarios will be highlighted.

  19. Application for coordinate transformation between Gaus - Kruger projection: Bessel ellipsoid and UTM projection: WGS84 ellipsoid

    Directory of Open Access Journals (Sweden)

    Zoran Gojković

    2017-01-01

    Full Text Available The physical surface of the earth has irregular shape which is not mathematically defined, therefore the shape of the Earth is approximated with mathematically defined surfaces such as ellipsoid and sphere. The developing of a global positioning systems, thus and modern navigation systems, as effect produce large amounts of data which contain the problem of homogeneity. This problem could be exceed if all the data are store in the same coordinate system. Hence the need for data transformation from local coordinate systems to the global coordinate systems. Global level implies WGS84 ellipsoid and UTM projection while national coordinate system of Republic Serbia is Gauss-Kruger with Bessel ellipsoid. This coordinate system of Republic Serbia on a global level has a local character. Applying appropriate mathematical models and functions it is possible to transform coordinates from one system to another and vice versa. The paper describes coordinate transformations from Gauss-Kruger coordinate system ellipsoid Bessel to UTM projection WGS84 ellipsoid and vice versa, and also an application which provides transformation of its kind that is made using open source environment. Name of the application is TRANS7_GK_UTM_GK and it can be found and used on the web page of the faculty for Mining and Geology under the link http://gk2utm.rgf.bg.ac.rs with a user guide.

  20. Manufacturing Methods and Technology Project Summary Reports

    Science.gov (United States)

    1984-12-01

    Powder ME-16 Type Recoil Mechanism Testing Machine (Powder Gymnasticator ) Projects 677, 78 7814 - Synthetic Quenchants for ME-18 Heat Treating Weapon...were deemed most urgent. These two were the prime candidates for the GEPTTA. Figure I is an artist depiction of the General Purpose Transportability...REPORT (RCS DRCMT-302) MMT Project 677 7753 titled "Noise Suppressor for Powder Type Recoil Mecha- nism Testing Machine (Powder Gymnasticator )" was