WorldWideScience

Sample records for projection operator technique

  1. Projection operator techniques in nonequilibrium statistical mechanics

    Grabert, H.

    1982-01-01

    This book is an introduction to the application of the projection operator technique to the statistical mechanics of irreversible processes. After a general introduction to the projection operator technique and statistical thermodynamics the Fokker-Planck and the master equation approach are described together with the response theory. Then, as applications the damped harmonic oscillator, simple fluids, and the spin relaxation are considered. (HSI)

  2. Connection between perturbation theory, projection-operator techniques, and statistical linearization for nonlinear systems

    Budgor, A.B.; West, B.J.

    1978-01-01

    We employ the equivalence between Zwanzig's projection-operator formalism and perturbation theory to demonstrate that the approximate-solution technique of statistical linearization for nonlinear stochastic differential equations corresponds to the lowest-order β truncation in both the consolidated perturbation expansions and in the ''mass operator'' of a renormalized Green's function equation. Other consolidated equations can be obtained by selectively modifying this mass operator. We particularize the results of this paper to the Duffing anharmonic oscillator equation

  3. A Three-Component Model for Magnetization Transfer. Solution by Projection-Operator Technique, and Application to Cartilage

    Adler, Ronald S.; Swanson, Scott D.; Yeung, Hong N.

    1996-01-01

    A projection-operator technique is applied to a general three-component model for magnetization transfer, extending our previous two-component model [R. S. Adler and H. N. Yeung,J. Magn. Reson. A104,321 (1993), and H. N. Yeung, R. S. Adler, and S. D. Swanson,J. Magn. Reson. A106,37 (1994)]. The PO technique provides an elegant means of deriving a simple, effective rate equation in which there is natural separation of relaxation and source terms and allows incorporation of Redfield-Provotorov theory without any additional assumptions or restrictive conditions. The PO technique is extended to incorporate more general, multicomponent models. The three-component model is used to fit experimental data from samples of human hyaline cartilage and fibrocartilage. The fits of the three-component model are compared to the fits of the two-component model.

  4. Project Management Techniques

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  5. Operational Waste Volume Projection

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  6. Operational waste volume projection

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  7. Operational Waste Volume Projection

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  8. The text of the Agreement establishing the Asian Regional Co-operative Project on Medical and Biological Applications of Nuclear Techniques

    1987-04-01

    The full text of the Agreement establishing the Asian Regional Co-operative Project on Medical and Biological Applications of Nuclear Techniques between the Agency and Member States is reproduced. The Agreement entered into force on 20 May 1986 after the Governments of Japan, Bangladesh and the Philippines had notified the Agency of their acceptance of the Agreement

  9. Statistical Techniques for Project Control

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  10. Remote handling techniques in decommissioning - A report of the NEA Co-operative Programme on Decommissioning (CPD) project

    Borchardt, Ralf; Denissen, Luc; Desbats, Philippe; Jeanjacques, Michel; Nokhamzon, Jean-Guy; Valentin, Pierre; Slater, Steve; Valencia, Luis; Wittenauer, Stephan; Yamauchi, Toyoaki; Burton, Bob

    2011-01-01

    The NEA Co-operative Programme for the Exchange of Scientific and Technical Information Concerning Nuclear Installation Decommissioning Projects (CPD) is a joint undertaking of a limited number of organisations actively executing on planning the decommissioning of nuclear facilities. The objective of the CPD is to acquire information from operational experience in decommissioning nuclear installations that is useful for future projects. Although part of the information exchanged within CPD is confidential in nature and is restricted to programme participants, experience of general interest gained under the programme's auspices is released for broader use. Such information is brought to the attention of all NEA members through regular reports to the NEA Radioactive Waste Management Committee (RWMC), as well as through published studies. This report describes generic results obtained by a CPD Task Group analysing the needs for remote technologies. The existing technologies able to meet these needs, the lessons learned and showing where improvements or further developments should be made in this domain. During the D and D process, the handling of highly radioactive materials, the deployment of tools and sensors and the dismantling of components built from many different materials can be a long, labor-intensive process that has the potential for high exposure rates, heat stress and injury to personnel. Mobile robotics systems provide solutions to these hazards. Such remote handling systems are required to perform tasks within budget and on schedule while justifying the expense by a saving in cumulative doses received by project personnel. To reach this goal, the following are additional factors that need to be evaluated when preparing a project: - System and peripherals must be operator-friendly. Ideally, the system must be designed to allow personnel currently available for the D and D project to become trained as operators within a reasonable time frame. - The

  11. Graduate Student Project: Operations Management Product Plan

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  12. Seniority in projection operator formalism

    Ullah, N.

    1976-01-01

    It is shown that the concept of seniority can be introduced in projection operator formalism through the use of the operator Q, which has been defined by de-Shalit and Talmi. The usefulness of seniority concept in projection operator formalism is discussed. An example of four nucleons in j=3/2 configuration is given for illustrative purposes

  13. `95 computer system operation project

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  14. '95 computer system operation project

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  15. Projective techniques in consumer research

    privaat

    Various projective techniques for personality assess- ment and psychoanalytic treatment in clinical psychol- .... Some social conventions or barriers may constrain the expression of feelings and reporting of behav- .... ject-stipulated characteristic. Brand mapping may be used in new product development and as a way to.

  16. Nasa's Operation Icebridge and Remote Sensing Techniques in the K-12 Classroom as a STEM Integration Project

    McCarthy, K.

    2017-12-01

    NASA's Operation IceBridge (OIB), the largest airborne survey of Earth's polar ice uses remote sensing methods to collect data on changing sea and land ice. PolarTREC teacher Kelly McCarthy joined the team during the 2016 Spring Arctic Campaign. This presentation explores ways in which k-12 students were engaged in the work being done by OIB through classroom learning experiences, digital communications, and independent research. Initially, digital communication including chats via NASA's Mission Tools Suite for Education (MTSE) platform was leveraged to engage students in the daily work of OIB. Two lessons were piloted with student groups during the 2016-2017 academic year both for students who actively engaged in communications with the team during the expedition and those who had no prior connections to the field. All of the data collected on OIB missions is stored for public use in a digital portal on the National Snow and Ice Data Center (NSIDC) website. In one lesson, 10th-12th grade students were guided through a tutorial to learn how to access data and begin to develop a story about Greenland's Jakobshavn Glacier using pre-selected data sets, Google's MyMaps app, and independent research methods. In the second lesson, 8th grade students were introduced to remote sensing, first through a discussion on vocabulary using productive talk moves and then via a demonstration using Vernier motion detectors and a graph matching simulation. Students worked in groups to develop procedures to map a hidden surface region (boxed assortment of miscellaneous objects) using a Vernier motion sensor to simulate sonar. Students translated data points collected from the motion sensor into a vertical profile of the simulated surface region. Both lessons allowed students a way to engage in two of the most important components of OIB. The ability to work with real data collected by the OIB team provided a unique context through which students gained skill and overcame challenges in

  17. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    Adams, N

    2007-01-01

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  18. The Rorschach: projective technique or psychometric test?

    Aronow, E; Reznikoff, M; Moreland, K L

    1995-04-01

    Various approaches to the Rorschach Technique are described in terms of the idiographic-nomothetic axis and the perceptual-content axis. It is suggested that it is most productive to view the Rorschach as a projective tool, with perceptual scoring a secondary factor. Current efforts at objectification of the Rorschach are not seen as useful as efforts to enhance its projective qualities. Some possible ways are discussed in which the projective value of the instrument can be maximized.

  19. Some Novel Techniques in Operational Semantics

    Mosses, Peter David

    2003-01-01

    Several novel techniques for use in operational semantics are presented. They were developed in connection with a modular vatriant of the conventional Structural Operational Semantics framework, but can also be exploited when modularity is of no great concern. Gives a simple introduction to the m......Several novel techniques for use in operational semantics are presented. They were developed in connection with a modular vatriant of the conventional Structural Operational Semantics framework, but can also be exploited when modularity is of no great concern. Gives a simple introduction...

  20. NEA international co-operative projects

    1989-01-01

    This text is consecrated at the international co-operative projects of the OECD Nuclear Energy Agency (NEA) in the field of reactor safety (Halden reactor project, Loft project, studies on the damaged Three Mile Island unit-2 reactor, inspection of reactor steel components, incident reporting system) and in the field of radioactive waste management (Stripa project, geochemical data bases, Alligator river project, seabed disposal of high-level radioactive waste, decommissioning of nuclear facilities)

  1. The embedded operating system project

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  2. Qualitative techniques for managing operational risk

    Delfiner, Miguel; Pailhé, Cristina

    2009-01-01

    Qualitative techniques are essential tools for identifying and assessing operational risk (OR). Their relevance in assessing OR can be understood due to the lack of a quantitative static model capable of capturing the dynamic operational risk profile which is shaped by managerial decisions. An operational risk profile obtained solely from historical loss data could further change due to corrective actions implemented by the bank after the occurrence of those events. This document introduces s...

  3. The embedded operating system project

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  4. Operational waste volume projection. Revision 20

    Koreski, G.M.; Strode, J.N.

    1994-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of July 1994

  5. Scientific Foundations of the Demining by Fusion of Techniques Project

    Larsen, Jan

    The Nordic Demining Research Forum (NDRF) has initiated a pilot project Demining by Fusion of Techniques (DeFuse), which will investigate the correlation between different methods used in mine action. While the ultimate purpose is to suggest new mine clearance operation practices, DeFuse will foc...... on achieving scientific and general knowledge about the coherence between different methods. This talk provides the scientific foundations for the project....

  6. Operating control techniques for maglev transport systems

    Kraft, K H; Schnieder, E

    1984-06-01

    The technical and operational possibilities of magnetic levitation transport systems can only be fully exploited by introducing 'intelligent' control systems which ensure automatic and trouble-free train running. The solution of exacting requirements in the fields of traction dynamics, security and control as well as information gathering transmission and processing is an important prior condition in that respect. The authors report here on the present state of research and development in operating control techniques applicable to maglev transport systems.

  7. Projected evolution superoperators and the density operator

    Turner, R.E.; Dahler, J.S.; Snider, R.F.

    1982-01-01

    The projection operator method of Zwanzig and Feshbach is used to construct the time dependent density operator associated with a binary scattering event. The formula developed to describe this time dependence involves time-ordered cosine and sine projected evolution (memory) superoperators. Both Schroedinger and interaction picture results are presented. The former is used to demonstrate the equivalence of the time dependent solution of the von Neumann equation and the more familiar frequency dependent Laplace transform solution. For two particular classes of projection superoperators projected density operators are shown to be equivalent to projected wave functions. Except for these two special cases, no projected wave function analogs of projected density operators exist. Along with the decoupled-motions approximation, projected interaction picture density operators are applied to inelastic scattering events. Simple illustrations are provided of how this formalism is related to previously established results for two-state processes, namely, the theory of resonant transfer events, the first order Magnus approximation, and the Landau-Zener theory

  8. Compensation techniques for operational amplifier bias current

    Silva, M.S.

    1981-01-01

    Two techniques are proposed for the compensation of the input current on operational amplifiers that can be used on inverting and non-inverting configurations. A qualitative analysis of temperature drift problems is made, and as a practical application, the construction of a voltage follower for high impedance measurements is presented. (Author) [pt

  9. Quark shell model using projection operators

    Ullah, N.

    1988-01-01

    Using the projection operators in the quark shell model, the wave functions for proton are calculated and expressions for calculating the wave function of neutron and also magnetic moment of proton and neutron are derived. (M.G.B.)

  10. Operator support system using computational intelligence techniques

    Bueno, Elaine Inacio, E-mail: ebueno@ifsp.edu.br [Instituto Federal de Educacao, Ciencia e Tecnologia de Sao Paulo (IFSP), Sao Paulo, SP (Brazil); Pereira, Iraci Martinez, E-mail: martinez@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    Computational Intelligence Systems have been widely applied in Monitoring and Fault Detection Systems in several processes and in different kinds of applications. These systems use interdependent components ordered in modules. It is a typical behavior of such systems to ensure early detection and diagnosis of faults. Monitoring and Fault Detection Techniques can be divided into two categories: estimative and pattern recognition methods. The estimative methods use a mathematical model, which describes the process behavior. The pattern recognition methods use a database to describe the process. In this work, an operator support system using Computational Intelligence Techniques was developed. This system will show the information obtained by different CI techniques in order to help operators to take decision in real time and guide them in the fault diagnosis before the normal alarm limits are reached. (author)

  11. Operator support system using computational intelligence techniques

    Bueno, Elaine Inacio; Pereira, Iraci Martinez

    2015-01-01

    Computational Intelligence Systems have been widely applied in Monitoring and Fault Detection Systems in several processes and in different kinds of applications. These systems use interdependent components ordered in modules. It is a typical behavior of such systems to ensure early detection and diagnosis of faults. Monitoring and Fault Detection Techniques can be divided into two categories: estimative and pattern recognition methods. The estimative methods use a mathematical model, which describes the process behavior. The pattern recognition methods use a database to describe the process. In this work, an operator support system using Computational Intelligence Techniques was developed. This system will show the information obtained by different CI techniques in order to help operators to take decision in real time and guide them in the fault diagnosis before the normal alarm limits are reached. (author)

  12. Graduate Student Project: Employer Operations Management Analysis

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  13. Phasor Simulator for Operator Training Project

    Dyer, Jim [Electric Power Group, Llc, Pasadena, CA (United States)

    2016-09-14

    Synchrophasor systems are being deployed in power systems throughout the North American Power Grid and there are plans to integrate this technology and its associated tools into Independent System Operator (ISO)/utility control room operations. A pre-requisite to using synchrophasor technologies in control rooms is for operators to obtain training and understand how to use this technology in real-time situations. The Phasor Simulator for Operator Training (PSOT) project objective was to develop, deploy and demonstrate a pre-commercial training simulator for operators on the use of this technology and to promote acceptance of the technology in utility and ISO/Regional Transmission Owner (RTO) control centers.

  14. Fault Management Techniques in Human Spaceflight Operations

    O'Hagan, Brian; Crocker, Alan

    2006-01-01

    This paper discusses human spaceflight fault management operations. Fault detection and response capabilities available in current US human spaceflight programs Space Shuttle and International Space Station are described while emphasizing system design impacts on operational techniques and constraints. Preflight and inflight processes along with products used to anticipate, mitigate and respond to failures are introduced. Examples of operational products used to support failure responses are presented. Possible improvements in the state of the art, as well as prioritization and success criteria for their implementation are proposed. This paper describes how the architecture of a command and control system impacts operations in areas such as the required fault response times, automated vs. manual fault responses, use of workarounds, etc. The architecture includes the use of redundancy at the system and software function level, software capabilities, use of intelligent or autonomous systems, number and severity of software defects, etc. This in turn drives which Caution and Warning (C&W) events should be annunciated, C&W event classification, operator display designs, crew training, flight control team training, and procedure development. Other factors impacting operations are the complexity of a system, skills needed to understand and operate a system, and the use of commonality vs. optimized solutions for software and responses. Fault detection, annunciation, safing responses, and recovery capabilities are explored using real examples to uncover underlying philosophies and constraints. These factors directly impact operations in that the crew and flight control team need to understand what happened, why it happened, what the system is doing, and what, if any, corrective actions they need to perform. If a fault results in multiple C&W events, or if several faults occur simultaneously, the root cause(s) of the fault(s), as well as their vehicle-wide impacts, must be

  15. Alarm handling systems and techniques developed to match operator tasks

    Bye, A; Moum, B R [Institutt for Energiteknikk, Halden (Norway). OECD Halden Reaktor Projekt

    1997-09-01

    This paper covers alarm handling methods and techniques explored at the Halden Project, and describes current status on the research activities on alarm systems. Alarm systems are often designed by application of a bottom-up strategy, generating alarms at component level. If no structuring of the alarms is applied, this may result in alarm avalanches in major plant disturbances, causing cognitive overload of the operator. An alarm structuring module should be designed using a top-down approach, analysing operator`s tasks, plant states, events and disturbances. One of the operator`s main tasks during plant disturbances is status identification, including determination of plant status and detection of plant anomalies. The main support of this is provided through the alarm systems, the process formats, the trends and possible diagnosis systems. The alarm system should both physically and conceptually be integrated with all these systems. 9 refs, 5 figs.

  16. Projection operator treatment of single particle resonances

    Lev, A.; Beres, W.P.

    1976-01-01

    A projection operator method is used to obtain the energy and width of a single particle resonance. The resonance energy is found without scanning. An example of the first g/sub 9/2/ neutron resonance in 40 Ca is given and compared with the traditional phase shift method. The results of both approaches are quite similar. 4 figures

  17. Operational Experience from Solar Thermal Energy Projects

    Cameron, C. P.

    1984-01-01

    Over the past few years, Sandia National Laboratories were involved in the design, construction, and operation of a number of DOE-sponsored solar thermal energy systems. Among the systems currently in operation are several industrial process heat projects and the Modular Industrial Solar Retrofit qualification test systems, all of which use parabolic troughs, and the Shenandoah Total Energy Project, which uses parabolic dishes. Operational experience has provided insight to both desirable and undesirable features of the designs of these systems. Features of these systems which are also relevant to the design of parabolic concentrator thermal electric systems are discussed. Other design features discussed are system control functions which were found to be especially convenient or effective, such as local concentrator controls, rainwash controls, and system response to changing isolation. Drive systems are also discussed with particular emphasis of the need for reliability and the usefulness of a manual drive capability.

  18. Spent Nuclear Fuel Project operational staffing plan

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  19. Felder uranium project--renewed operations

    Anon.

    1979-01-01

    Exxon owns a uranium mill and holds two mining leases in Live Oak County, Texas, about halfway between San Antonio and Corpus Christi. The properties made up the Felder Uranium Operations which was reopened earlier this year. The feasibility study for reopening the Felder Project began in late 1975 and was not completed until late 1976. This paper discusses several areas of the feasibility study that required additional work prior to making the decision to renew operations. Mine planning evaluation and the actual mine planning are described briefly

  20. Quantum canonical ensemble: A projection operator approach

    Magnus, Wim; Lemmens, Lucien; Brosens, Fons

    2017-09-01

    Knowing the exact number of particles N, and taking this knowledge into account, the quantum canonical ensemble imposes a constraint on the occupation number operators. The constraint particularly hampers the systematic calculation of the partition function and any relevant thermodynamic expectation value for arbitrary but fixed N. On the other hand, fixing only the average number of particles, one may remove the above constraint and simply factorize the traces in Fock space into traces over single-particle states. As is well known, that would be the strategy of the grand-canonical ensemble which, however, comes with an additional Lagrange multiplier to impose the average number of particles. The appearance of this multiplier can be avoided by invoking a projection operator that enables a constraint-free computation of the partition function and its derived quantities in the canonical ensemble, at the price of an angular or contour integration. Introduced in the recent past to handle various issues related to particle-number projected statistics, the projection operator approach proves beneficial to a wide variety of problems in condensed matter physics for which the canonical ensemble offers a natural and appropriate environment. In this light, we present a systematic treatment of the canonical ensemble that embeds the projection operator into the formalism of second quantization while explicitly fixing N, the very number of particles rather than the average. Being applicable to both bosonic and fermionic systems in arbitrary dimensions, transparent integral representations are provided for the partition function ZN and the Helmholtz free energy FN as well as for two- and four-point correlation functions. The chemical potential is not a Lagrange multiplier regulating the average particle number but can be extracted from FN+1 -FN, as illustrated for a two-dimensional fermion gas.

  1. Alarm handling systems and techniques developed to match operator tasks

    Bye, A.; Moum, B.R.

    1997-01-01

    This paper covers alarm handling methods and techniques explored at the Halden Project, and describes current status on the research activities on alarm systems. Alarm systems are often designed by application of a bottom-up strategy, generating alarms at component level. If no structuring of the alarms is applied, this may result in alarm avalanches in major plant disturbances, causing cognitive overload of the operator. An alarm structuring module should be designed using a top-down approach, analysing operator's tasks, plant states, events and disturbances. One of the operator's main tasks during plant disturbances is status identification, including determination of plant status and detection of plant anomalies. The main support of this is provided through the alarm systems, the process formats, the trends and possible diagnosis systems. The alarm system should both physically and conceptually be integrated with all these systems. 9 refs, 5 figs

  2. Double Star project - master science operations plan

    Shen, C.; Liu, Z.

    2005-11-01

    For Double Star Project (DSP) exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2) and during the mission operating phase, the long-term and short-term master science operations plans (MSOP) were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  3. Double Star project - master science operations plan

    C. Shen

    2005-11-01

    Full Text Available For Double Star Project (DSP exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2 and during the mission operating phase, the long-term and short-term master science operations plans (MSOP were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  4. A German research project about applicable graphite cutting techniques

    Holland, D.; Quade, U.; Bach, F.W.; Wilk, P.

    2001-01-01

    In Germany, too, quite large quantities of irradiated nuclear graphite, used in research and prototype reactors, are waiting for an environmental way of disposal. While incineration of nuclear graphite does not seem to be a publicly acceptable way, cutting and packaging into ductile cast iron containers could be a suitable way of disposal in Germany. Nevertheless, the cutting of graphite is also a very difficult technique by which a large amount of secondary waste or dust might occur. An applicable graphite cutting technique is needed. Therefore, a group of 13 German partners, consisting of one university, six research reactor operators, one technical inspection authority, three engineering companies, one industrial cutting specialist and one commercial dismantling company, decided in 1999 to start a research project to develop an applicable technique for cutting irradiated nuclear graphite. Aim of the project is to find the most suitable cutting techniques for the existing shapes of graphite blocks with a minimum of waste production rate. At the same time it will be learned how to sample the dust and collect it in a filter system. The following techniques will be tested and evaluated: thermal cutting, water jet cutting, mechanical cutting with a saw, plasma arc cutting, drilling. The subsequent evaluation will concentrate on dust production, possible irradiation of staff, time and practicability under different constraints. This research project is funded by the German Minister of Education and Research under the number 02 S 7849 for a period of two years. A brief overview about the work to be carried out in the project will be given. (author)

  5. Projection operator method for collective tunneling transitions

    Kohmura, Toshitake; Ohta, Hirofumi; Hashimoto, Yukio; Maruyama, Masahiro

    2002-01-01

    Collective tunneling transitions take place in the case that a system has two nearly degenerate ground states with a slight energy splitting, which provides the time scale of the tunneling. The Liouville equation determines the evolution of the density matrix, while the Schroedinger equation determines that of a state. The Liouville equation seems to be more powerful for calculating accurately the energy splitting of two nearly degenerate eigenstates. However, no method to exactly solve the Liouville eigenvalue equation has been established. The usual projection operator method for the Liouville equation is not feasible. We analytically solve the Liouville evolution equation for nuclear collective tunneling from one Hartree minimum to another, proposing a simple and solvable model Hamiltonian for the transition. We derive an analytical expression for the splitting of energy eigenvalues from a spectral function of the Liouville evolution using a half-projected operator method. A full-order analytical expression for the energy splitting is obtained. We define the collective tunneling path of a microscopic Hamiltonian for collective tunneling, projecting the nuclear ground states onto n-particle n-hole state spaces. It is argued that the collective tunneling path sector of a microscopic Hamiltonian can be transformed into the present solvable model Hamiltonian. (author)

  6. Managing Operating Procedures in Distributed Collaborative Projects

    Hool, A.; Beuzelin Ollivier, M.-G.; Roubert, F.

    2013-04-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity - a field which has only been under investigation for a few years and is still lacking regulatory framework - highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  7. Managing Operating Procedures in Distributed Collaborative Projects

    Hool, A; Ollivier, M-G Beuzelin; Roubert, F

    2013-01-01

    In recent years, large distributed collaborative projects have become very prominent in scientific research, allowing exchanges between laboratories located in different institutions and countries and between various domains of competence. Particularly the work on nanotoxicity – a field which has only been under investigation for a few years and is still lacking regulatory framework – highlighted the need for well-controlled methods, as well as rules for the handling and disposal of used materials. To obtain comparable and reproducible results of experiments conducted in a distributed context, the standardisation and proper documentation of the applied methods is crucial. The European project NanoDiaRA, whose aim is to develop nanoparticles and biomarkers for the early diagnosis of inflammatory disease, faces this situation as it involves 15 European partners and brings together different scientific cultures and professional backgrounds. Protocols especially developed for Superparamagnetic Iron Oxide Nanoparticles and a management system were designed and implemented within the NanoDiaRA project to fulfil those needs. The main goals were the establishment of standardised Standard Operating Procedures assuring transparency and reproducibility and the provision of access to these protocols to every project partner, as well as their clear allocation to carry out precise measurements and production steps.

  8. Techniques for Analysing Problems in Engineering Projects

    Thorsteinsson, Uffe

    1998-01-01

    Description of how CPM network can be used for analysing complex problems in engineering projects.......Description of how CPM network can be used for analysing complex problems in engineering projects....

  9. Power demand operation - environment and potential. Proposals for main project

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  10. Construction of vertex operators using operator formalism techniques

    Gato, B.; Massachusetts Inst. of Tech., Cambridge

    1989-01-01

    We derive vertex operators in oscillator form as an application of the conserved charges method developed by Vafa for the operator formalism in higher genus Riemann surfaces. This construction proves to be clear, direct and valid for the bosonic and fermionic strings as wells as for twisted strings on orbifolds. We discuss the method and construct vertex operators for the bosonic string moving on Z N orbifolds and for the fermionic string in the NSR formulation. (orig.)

  11. Alternative techniques for environmental project management

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  12. Projection Operator: A Step Towards Certification of Adaptive Controllers

    Larchev, Gregory V.; Campbell, Stefan F.; Kaneshige, John T.

    2010-01-01

    One of the major barriers to wider use of adaptive controllers in commercial aviation is the lack of appropriate certification procedures. In order to be certified by the Federal Aviation Administration (FAA), an aircraft controller is expected to meet a set of guidelines on functionality and reliability while not negatively impacting other systems or safety of aircraft operations. Due to their inherent time-variant and non-linear behavior, adaptive controllers cannot be certified via the metrics used for linear conventional controllers, such as gain and phase margin. Projection Operator is a robustness augmentation technique that bounds the output of a non-linear adaptive controller while conforming to the Lyapunov stability rules. It can also be used to limit the control authority of the adaptive component so that the said control authority can be arbitrarily close to that of a linear controller. In this paper we will present the results of applying the Projection Operator to a Model-Reference Adaptive Controller (MRAC), varying the amount of control authority, and comparing controller s performance and stability characteristics with those of a linear controller. We will also show how adjusting Projection Operator parameters can make it easier for the controller to satisfy the certification guidelines by enabling a tradeoff between controller s performance and robustness.

  13. High-contrast Nulling Interferometry Techniques Project

    National Aeronautics and Space Administration — "We are developing rotating-baseline nulling-interferometry techniques and algorithms on the single-aperture Hale and Keck telescopes at near-infrared wavelengths,...

  14. Innovative Concepts and Operational Techniques for the Strategic National Stockpile

    Adams, S. A.

    2007-01-01

    This presentation is to discuss the innovative concepts and operational techniques developed by the Center for Disease Control and Prevention's Division of Strategic National Stockpile (DSNS). The primary response model for the SNS is to move from secure strategic storage locations to an area of need within 12 hours to augment local resources. While this 12 hour response is appropriate for most threat scenarios, it clearly cannot meet the needs of first line responders who need to rapidly administer initial dosing of nerve agent antidote. To address the threat of nerve agent poisoning the DSNS developed the CHEMPACK Project which allows centralized SNS management forward placement within hundreds of local jurisdictions. Another variation from the primary mission of the DSNS is addressing the nation's potential shortfall in non-acute care bed capacity. To address this mission, the Federal Medical Station (FMS) program was created to build surge capability to meet a range of non-acute medical needs following a disaster. The FMS model is a pre-configured 250 bed unit that is deployable throughout the Nation and configured to respond rapidly. Operational techniques used to maximize product lifespan and efficacy will also be discussed.(author)

  15. Techniques for evaluating optimum data center operation

    Hamann, Hendrik F.; Rodriguez, Sergio Adolfo Bermudez; Wehle, Hans-Dieter

    2017-06-14

    Techniques for modeling a data center are provided. In one aspect, a method for determining data center efficiency is provided. The method includes the following steps. Target parameters for the data center are obtained. Technology pre-requisite parameters for the data center are obtained. An optimum data center efficiency is determined given the target parameters for the data center and the technology pre-requisite parameters for the data center.

  16. An OperationalProject Management Culture’ Framework (Part 1

    Yvonne du Plessis

    2006-11-01

    Full Text Available The aim of this research is to develop an operationalproject management culture’ framework, which can be used by project managers and organisations to support project work. One of the main causes of project failure is attributed to a non-supportive project management culture in organisations. A triangulation method is followed inclusive of a thorough literature review, a survey questionnaire and a concept mapping process. A project management culture framework with descriptive elements, based on Deal and Kennedy’s (1982 definition of organisational culture, comprising of four dimensions i.e. project process; people in projects; project systems and structure, and project environment was developed.

  17. Operative techniques for cervical radiculopathy and myelopathy.

    Moran, C

    2012-02-01

    The surgical treatment of cervical spondylosis and resulting cervical radiculopathy or myelopathy has evolved over the past century. Surgical options for dorsal decompression of the cervical spine includes the traditional laminectomy and laminoplasty, first described in Asia in the 1970\\'s. More recently the dorsal approch has been explored in terms of minimally invasive options including foraminotomies for nerve root descompression. Ventral decompression and fusion techniques are also described in the article, including traditional anterior cervical discectomy and fusion, strut grafting and cervical disc arthroplasty. Overall, the outcome from surgery is determined by choosing the correct surgery for the correct patient and pathology and this is what we hope to explain in this brief review.

  18. Evaluation of Building Projects Using Earned Value Technique ...

    This study evaluates building construction projects using the Earned Value Analysis technique, the Experimental Approach, and Value Concept Analysis. The aim was to compare the cost incurred for an identified amount of work done on a project with the cost budgeted for the same work. The results were used to calculate ...

  19. Learning Physics through Project-Based Learning Game Techniques

    Baran, Medine; Maskan, Abdulkadir; Yasar, Seyma

    2018-01-01

    The aim of the present study, in which Project and game techniques are used together, is to examine the impact of project-based learning games on students' physics achievement. Participants of the study consist of 34 9th grade students (N = 34). The data were collected using achievement tests and a questionnaire. Throughout the applications, the…

  20. RPERT: Repetitive-Projects Evaluation and Review Technique

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  1. Final report, Ames Mobile Laboratory Project: The development and operation of instrumentation in a mobile laboratory for in situ, real-time screening and characterization of soils using the laser ablation sampling technique

    Anderson, M.S.; Braymen, S.D.

    1995-01-01

    The main focus of the Ames Laboratory's Technology Integration Program, TIP, from May 1991 through December 1994 was the development, fabrication, and demonstration of a mobile instrumentation laboratory incorporating rapid in situ sampling systems for safe, rapid, and cost effective soil screening/characterization. The Mobile Demonstration Laboratory for Environmental Screening Technologies, MDLEST, containing the analysis instrumentation, along with surface and subsurface sampling probe prototypes employing the laser ablation sampling technique were chosen to satisfy the particular surface and subsurface soil characterization needs of the various Department of Energy facilities for determining the extent of heavy metal and radionuclide contamination. The MDLEST, a 44 foot long 5th wheel trailer, is easily configured for the analysis instrumentation and sampling system required for the particular site work. This mobile laboratory contains all of the utilities needed to satisfy the operating requirements of the various instrumentation installed. These utilities include, an electric generator, a chilled water system, process gases, a heating/air conditioning system, and computer monitoring and automatic operating systems. Once the MDLEST arrives at the job site, the instrumentation is aligned and calibration is completed, sampling and analysis operations begin. The sample is acquired, analyzed and the results reported in as little as 10 minutes. The surface sampling probe is used in two modes to acquire samples for analysis. It is either set directly on the ground over the site to be sampled, in situ sampling, or in a special fixture used for calibrating the sampling analysis system with standard soil samples, having the samples brought to the MDLEST. The surface sampling probe was used to in situ sample a flat concrete surface (nondestructively) with the ablated sample being analyzed by the instrumentation in the MDLEST

  2. An operator expansion technique for path integral analysis

    Tsvetkov, I.V.

    1995-01-01

    A new method of path integral analysis in the framework of a power series technique is presented. The method is based on the operator expansion of an exponential. A regular procedure to calculate the correction terms is found. (orig.)

  3. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  4. Analysis of the F. Calogero Type Projection-Algebraic Scheme for Differential Operator Equations

    Lustyk, Miroslaw; Bogolubov, Nikolai N. Jr.; Blackmore, Denis; Prykarpatsky, Anatoliy K.

    2010-12-01

    The existence, convergence, realizability and stability of solutions of differential operator equations obtained via a novel projection-algebraic scheme are analyzed in detail. This analysis is based upon classical discrete approximation techniques coupled with a recent generalization of the Leray-Schauder fixed point theorem. An example is included to illustrate the efficacy of the projection scheme and analysis strategy. (author)

  5. Evaluation of nuclear power plant operating procedures classifications and interfaces: Problems and techniques for improvement

    Barnes, V.E.; Radford, L.R.

    1987-02-01

    This report presents activities and findings of a project designed to evaluate current practices and problems related to procedure classification schemes and procedure interfaces in commercial nuclear power plants. The phrase ''procedure classification scheme'' refers to how plant operating procedures are categorized and indexed (e.g., normal, abnormal, emergency operating procedures). The term ''procedure interface'' refers to how reactor operators are instructed to transition within and between procedures. The project consisted of four key tasks, including (1) a survey of literature regarding problems associated with procedure classifications and interfaces, as well as techniques for overcoming them; (2) interviews with experts in the nuclear industry to discuss the appropriate scope of different classes of operating procedures and techniques for managing interfaces between them; (3) a reanalysis of data gathered about nuclear power plant normal operating and off-normal operating procedures in a related project, ''Program Plan for Assessing and Upgrading Operating Procedures for Nuclear Power Plants''; and (4) solicitation of the comments and expert opinions of a peer review group on the draft project report and on proposed techniques for resolving classification and interface issues. In addition to describing these activities and their results, recommendations for NRC and utility actions to address procedure classification and interface problems are offered

  6. Application of artificial intelligence techniques to TRR operation

    Ho, L.; Tseng, C.; Chang, S.

    1986-01-01

    It has been over ten years since TRR had its initial critical. To collect the experiences of shift operators and technique staffs and transfer these experts' knowledge to a computer and build an expert system is a typical application of artificial intelligence techniques to nuclear business. The system can provide the correct information of TRR operation for shift personnel, new staffs and other technical people

  7. Phased project planning and development in anticipation of operational programs

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  8. Techniques for preparing flowchart-format emergency operating procedures: Background (Sections 1.0-9.0)

    Barnes, V.E.; Moore, C.J.; Wieringa, D.R.; Isakson, C.S.; Kono, B.K.; Gruel, R.L.

    1989-01-01

    This two-volume report describes the activities, findings, and recommendations of a project entitled ''Techniques for Presenting Flowchart-Format Emergency Operating Procedures.'' The project team surveyed the literature pertaining to flowcharts, reviewed existing flowchart emergency operating procedures (EOPs), interviewed consultants who produced flowcharts, and interviewed reactor operator licensing examiners about the use of flowcharts in nuclear power plants. This document, and Volume 1 of this report, discusses the use of flowchart-format EOPs in nuclear power plants and presents issue to be addressed in the design and implementation of flowchart EOPs. 66 refs., 76 figs., 2 tabs

  9. Homogeneous operators and projective representations of the ...

    Springer Verlag Heidelberg #4 2048 1996 Dec 15 10:16:45

    group of all unitary operators in B(H) will be denoted by U(H). .... with the characteristic function of the compression of multiplication by z to the subspace ...... [32] Varadarajan V S, Geometry of quantum theory (New York: Springer Verlag) 1985.

  10. Diagonal ordering operation technique applied to Morse oscillator

    Popov, Dušan, E-mail: dusan_popov@yahoo.co.uk [Politehnica University Timisoara, Department of Physical Foundations of Engineering, Bd. V. Parvan No. 2, 300223 Timisoara (Romania); Dong, Shi-Hai [CIDETEC, Instituto Politecnico Nacional, Unidad Profesional Adolfo Lopez Mateos, Mexico D.F. 07700 (Mexico); Popov, Miodrag [Politehnica University Timisoara, Department of Steel Structures and Building Mechanics, Traian Lalescu Street, No. 2/A, 300223 Timisoara (Romania)

    2015-11-15

    We generalize the technique called as the integration within a normally ordered product (IWOP) of operators referring to the creation and annihilation operators of the harmonic oscillator coherent states to a new operatorial approach, i.e. the diagonal ordering operation technique (DOOT) about the calculations connected with the normally ordered product of generalized creation and annihilation operators that generate the generalized hypergeometric coherent states. We apply this technique to the coherent states of the Morse oscillator including the mixed (thermal) state case and get the well-known results achieved by other methods in the corresponding coherent state representation. Also, in the last section we construct the coherent states for the continuous dynamics of the Morse oscillator by using two new methods: the discrete–continuous limit, respectively by solving a finite difference equation. Finally, we construct the coherent states corresponding to the whole Morse spectrum (discrete plus continuous) and demonstrate their properties according the Klauder’s prescriptions.

  11. Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique

    Walid Mustafa Kamas

    2017-05-01

    Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.

  12. Recent Positioning Techniques for Efficient Port Operations and Development of Suez Canal Corridor

    Ahmed Elhattab

    2016-12-01

    Full Text Available The current developments in positioning techniques and communication technology have great impact on both construction and operations of ports. The majority of positioning systems for marine traffic are satellite based such as GPS. Virtual Reference Station is one of the recent high precision techniques for GNSS positioning which can be used for smart and efficient port.The advantages of using virtual reference station technique in different port operation and construction have been discussed in this paper. To apply this technique in Suez Canal corridor zone, a design of Continuously Operating Reference Station network has been proposed. This network can be utilized during different construction and operations phases of Suez Canal Corridor project.  

  13. Bure CLIS: role, operation, disposal project

    Jaquet, B.

    2011-01-01

    The Local Information and Oversight Committee (CLIS) is an independent body tasked by law to monitor studies carried out by the French National Radioactive Waste Management Agency (ANDRA) at the Bure laboratory and in the area surrounding Bure, within the framework of research on radioactive waste management and, in particular, on final disposal of such waste in deep geological formations. The role of the CLIS, whose members include representatives of the State, Parliament, local authorities, unions, associations and the medical profession, is to provide all population groups, beginning with the inhabitants of La Meuse and La Haute-Marne departments, with information regarding these studies and their results, as well as the underground repository project and the stakes involved: it is thus the chief contact for the inhabitants of the area. It also encourages discussion of a project that is subject to a long decision-making process, during which the CLIS is called upon to give its opinion at different stages. The objectives of the CLIS' actions are to provide information to as wide a public as possible (through public meetings, a regular newsletter and a web site) using its own data (appraisals and independent assessments), so that the public can effectively contribute to the debates held throughout the process, and also to be an independent player in the process, whenever its involvement is required and even when this is not specifically planned. (author)

  14. Applying decision-making techniques to Civil Engineering Projects

    Fam F. Abdel-malak

    2017-12-01

    Full Text Available Multi-Criteria Decision-Making (MCDM techniques are found to be useful tools in project managers’ hands to overcome decision-making (DM problems in Civil Engineering Projects (CEPs. The main contribution of this paper includes selecting and studying the popular MCDM techniques that uses different and wide ranges of data types in CEPs. A detailed study including advantages and pitfalls of using the Analytic Hierarchy Process (AHP and Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (Fuzzy TOPSIS is introduced. Those two techniques are selected for the purpose of forming a package that covers most available data types in CEPs. The results indicated that AHP has a structure which simplifies complicated problems, while Fuzzy TOPSIS uses the advantages of linguistic variables to solve the issue of undocumented data and ill-defined problems. Furthermore, AHP is a simple technique that depends on pairwise comparisons of factors and natural attributes, beside it is preferable for widely spread hierarchies. On the other hand, Fuzzy TOPSIS needs more information but works well for the one-tier decision tree as well as it shows more flexibility to work in fuzzy environments. The two techniques have the facility to be integrated and combined in a new module to support most of the decisions required in CEPs. Keywords: Decision-making, AHP, Fuzzy TOPSIS, CBA, Civil Engineering Projects

  15. User's operating procedures. Volume 2: Scout project financial analysis program

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  16. User's operating procedures. Volume 1: Scout project information programs

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  17. Weyl Ordering Operator Formula Derived by IWOP Technique and Its Application for Fresnel Operator

    Fan Hongyi; Hu Liyun

    2009-01-01

    Based on the technique of integration within an ordered product of operators, the Weyl ordering operator formula is derived and the Fresnel operators' Weyl ordering is also obtained, which together with the Weyl transformation can immediately lead to Fresnel transformation kernel in classical optics. (general)

  18. Exploration of projective techniques to unravel health perception

    Sijtsema, S.J.; Linnemann, A.R.; Backus, G.B.C.; Jongen, W.M.F.; Gaasbeek, van A.F.; Dagevos, H.

    2007-01-01

    Purpose - This paper seeks to explore the design, organisation and application of group discussions in which projective techniques (expressive and associative) are used to unravel health perception of consumers in cognitive and affective terms. Design/methodology/approach - A trained moderator led

  19. Native Advertising: Trickery or Technique? An Ethics Project and Debate

    Zarzosa, Jennifer; Fischbach, Sarah

    2017-01-01

    Sponsored content, in-feed ads, and advertorials are innovative ways to promote brands. However, there are limited resources on how to use these advertising techniques. The Native Advertising project and debate helps students (a) gain knowledge and experience with current advertising practices and (b) engage in deliberation regarding a promotional…

  20. Wabash River coal gasification repowering project -- first year operation experience

    Troxclair, E.J. [Destec Energy, Inc., Houston, TX (United States); Stultz, J. [PSI Energy, Inc., West Terre Haute, IN (United States)

    1997-12-31

    The Wabash River Coal Gasification Repowering Project (WRCGRP), a joint venture between Destec Energy, Inc. and PSI Energy, Inc., began commercial operation in November of 1995. The Project, selected by the United States Department of Energy (DOE) under the Clean Coal Program (Round IV) represents the largest operating coal gasification combined cycle plant in the world. This Demonstration Project has allowed PSI Energy to repower a 1950`s vintage steam turbine and install a new syngas fired combustion turbine to provide 262 MW (net) of electricity in a clean, efficient manner in a commercial utility setting while utilizing locally mined high sulfur Indiana bituminous coal. In doing so, the Project is also demonstrating some novel technology while advancing the commercialization of integrated coal gasification combined cycle technology. This paper discusses the first year operation experience of the Wabash Project, focusing on the progress towards achievement of the demonstration objectives.

  1. Operation optimization of distributed generation using artificial intelligent techniques

    Mahmoud H. Elkazaz

    2016-06-01

    Full Text Available Future smart grids will require an observable, controllable and flexible network architecture for reliable and efficient energy delivery. The use of artificial intelligence and advanced communication technologies is essential in building a fully automated system. This paper introduces a new technique for online optimal operation of distributed generation (DG resources, i.e. a hybrid fuel cell (FC and photovoltaic (PV system for residential applications. The proposed technique aims to minimize the total daily operating cost of a group of residential homes by managing the operation of embedded DG units remotely from a control centre. The target is formed as an objective function that is solved using genetic algorithm (GA optimization technique. The optimal settings of the DG units obtained from the optimization process are sent to each DG unit through a fully automated system. The results show that the proposed technique succeeded in defining the optimal operating points of the DGs that affect directly the total operating cost of the entire system.

  2. Image reconstruction technique using projection data from neutron tomography system

    Waleed Abd el Bar

    2015-12-01

    Full Text Available Neutron tomography is a very powerful technique for nondestructive evaluation of heavy industrial components as well as for soft hydrogenous materials enclosed in heavy metals which are usually difficult to image using X-rays. Due to the properties of the image acquisition system, the projection images are distorted by several artifacts, and these reduce the quality of the reconstruction. In order to eliminate these harmful effects the projection images should be corrected before reconstruction. This paper gives a description of a filter back projection (FBP technique, which is used for reconstruction of projected data obtained from transmission measurements by neutron tomography system We demonstrated the use of spatial Discrete Fourier Transform (DFT and the 2D Inverse DFT in the formulation of the method, and outlined the theory of reconstruction of a 2D neutron image from a sequence of 1D projections taken at different angles between 0 and π in MATLAB environment. Projections are generated by applying the Radon transform to the original image at different angles.

  3. The carbon market: major operational carbon funds and financed projects

    Markandya, A.; Nobili, V.

    2008-01-01

    The flexible mechanisms envisaged by the Kyoto Protocol have led gradually to a global carbon market that has become very appetizing for companies operating in the sector. Financial instruments such as carbon funds, and investments in greenhouse-gas-reduction projects, now operate at the international level, counting on the development of new technologies and energy efficiency, and contributing to sustainable development in the countries that host the projects [it

  4. Projection operator and propagator for an arbitrary integral spin

    Huang Shi Zhong; Wu Ning; Zheng Zhi Peng

    2002-01-01

    Based on the solution of the Bargmann-Wigner equation for an arbitrary integral spin, a direct derivation of the projection operator and propagator for an arbitrary integral spin is presented. The explicit form for the spin projection operators constructed by Behrends and Fronsdal is confirmed. The commutation rules and a general expression for the Feynman propagator for a free particle of arbitrary integral spin are deduced

  5. Hanford tank waste operation simulator operational waste volume projection verification and validation procedure

    HARMSEN, R.W.

    1999-01-01

    The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement

  6. Employing lighting techniques during on-orbit operations

    Wheelwright, Charles D.; Toole, Jennifer R.

    As a result of past space missions and evaluations, many procedures have been established and shown to be prudent applications for use in present and future space environment scenarios. However, recent procedures to employ the use of robotics to assist crewmembers in performing tasks which require viewing remote and obstructed locations have led to a need to pursue alternative methods to assist in these operations. One of those techniques which is under development entails incorporating the use of suitable lighting aids/techniques with a closed circuit television (CCTV) camera/monitor system to supervise the robotics operations. The capability to provide adequate lighting during grappling, deploying, docking and berthing operations under all on-orbit illumination conditions is essential to a successful mission. Using automated devices such as the Remote Manipulator System (RMS) to dock and berth a vehicle during payload retrieval, under nighttime, earthshine, solar, or artificial illumination conditions can become a cumbersome task without first incorporating lighting techniques that provide the proper target illumination, orientation, and alignment cues. Studies indicate that the use of visual aids such as the CCTV with a pretested and properly oriented lighting system can decrease the time necessary to accomplish grappling tasks. Evaluations have been and continue to be performed to assess the various on-orbit conditions in order to predict and determine the appropriate lighting techniques and viewing angles necessary to assist crewmembers in payload operations.

  7. Using Powerpoint Animations to Teach Operations Management Techniques and Concepts

    Treleven, Mark D.; Penlesky, Richard J.; Callarman, Thomas E.; Watts, Charles A.; Bragg, Daniel J.

    2014-01-01

    This article examines the value of using complex animated PowerPoint presentations to teach operations management techniques and concepts. To provide context, literature covering the use of PowerPoint animations in business education is briefly reviewed. The specific animations employed in this study are identified and their expected benefits to…

  8. Using project management techniques in hydro-relicensing

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  9. Science operations management. [with Infrared Astronomy Satellite project

    Squibb, G. F.

    1984-01-01

    The operation teams engaged in the IR Astronomical Satellite (IRAS) project included scientists from the IRAS International Science Team. The detailed involvement of these scientists in the design, testing, validation, and operations phases of the IRAS mission contributed to the success of this project. The Project Management Group spent a substantial amount of time discussing science-related issues, because science team coleaders were members from the outset. A single scientific point-of-contact for the Management Group enhanced the depth and continuity of agreement reached in decision-making.

  10. User's operating procedures. Volume 3: Projects directorate information programs

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  11. Lightning Initiation Forecasting: An Operational Dual-Polarimetric Radar Technique

    Woodard, Crystal J.; Carey, L. D.; Petersen, W. A.; Roeder, W. P.

    2011-01-01

    The objective of this NASA MSFC and NOAA CSTAR funded study is to develop and test operational forecast algorithms for the prediction of lightning initiation utilizing the C-band dual-polarimetric radar, UAHuntsville's Advanced Radar for Meteorological and Operational Research (ARMOR). Although there is a rich research history of radar signatures associated with lightning initiation, few studies have utilized dual-polarimetric radar signatures (e.g., Z(sub dr) columns) and capabilities (e.g., fuzzy-logic particle identification [PID] of precipitation ice) in an operational algorithm for first flash forecasting. The specific goal of this study is to develop and test polarimetric techniques that enhance the performance of current operational radar reflectivity based first flash algorithms. Improving lightning watch and warning performance will positively impact personnel safety in both work and leisure environments. Advanced warnings can provide space shuttle launch managers time to respond appropriately to secure equipment and personnel, while they can also provide appropriate warnings for spectators and players of leisure sporting events to seek safe shelter. Through the analysis of eight case dates, consisting of 35 pulse-type thunderstorms and 20 non-thunderstorm case studies, lightning initiation forecast techniques were developed and tested. The hypothesis is that the additional dual-polarimetric information could potentially reduce false alarms while maintaining high probability of detection and increasing lead-time for the prediction of the first lightning flash relative to reflectivity-only based techniques. To test the hypothesis, various physically-based techniques using polarimetric variables and/or PID categories, which are strongly correlated to initial storm electrification (e.g., large precipitation ice production via drop freezing), were benchmarked against the operational reflectivity-only based approaches to find the best compromise between

  12. Digital Handover of Data from Building Projects to Building Operation

    Jensen, Per Anker

    2006-01-01

    pro-jects to building operation. This project started in 2004 with research and analyses fol-lowed by development of a proposal for client requirements and in 2005 a first test on a real construction project has been carried out. After revision of the requirements a second test will be started early...... and construction and on the other side in building opera-tion and facilities management. In Denmark the government has launched a development program called Digital Construction and one of the projects concerns specifying require-ments for building clients in relation to digital handover of data from construction...... by a consortium called DACaPo consisting of a building client/facilities manager, a consulting company, a contractor and a university institute. This paper presents some of the results from the project with the main focus on the initial research....

  13. System supplier approach to projects and operations efficiency

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  14. A rapid parallelization of cone-beam projection and back-projection operator based on texture fetching interpolation

    Xie, Lizhe; Hu, Yining; Chen, Yang; Shi, Luyao

    2015-03-01

    Projection and back-projection are the most computational consuming parts in Computed Tomography (CT) reconstruction. Parallelization strategies using GPU computing techniques have been introduced. We in this paper present a new parallelization scheme for both projection and back-projection. The proposed method is based on CUDA technology carried out by NVIDIA Corporation. Instead of build complex model, we aimed on optimizing the existing algorithm and make it suitable for CUDA implementation so as to gain fast computation speed. Besides making use of texture fetching operation which helps gain faster interpolation speed, we fixed sampling numbers in the computation of projection, to ensure the synchronization of blocks and threads, thus prevents the latency caused by inconsistent computation complexity. Experiment results have proven the computational efficiency and imaging quality of the proposed method.

  15. Optimum operation of restoration techniques for eutrophic water bodies

    Hagen, N. M.; Kleeberg, H.-B.

    1994-05-01

    Operating rules have been applied in water resources management for a long time in order to control and supply a required quantity (volume) of water. The operating rules have to guarantee the optimum management of the reservoir(s). The quality of the stored water has been satisfactory for the desired utilization up to the sixties. Due to the deterioration of reservoir water quality through human impacts, however, increased attention had to be paid since. Eutrophication of stagnant waters is still an unsolved problem. Through means of various restoration techniques, i.e., dilution/flushing or hypolimnetic withdrawal, the quality of the stored water can be improved. Continuous operation or appropriate time or depth variant operating rules are required to achieve this goal. The paper presents such rules for long-term operation. They have been established for the first time and can he represented in two or three-dimensional graphs depending on the number of included components (e.g., actual water storage and quality). The ‘quality operating rules’ take into account the dynamics of the processes in aquatic ecosystems. Simplifications with regard to application and acceptance (e.g., clarity) are developed and tested. The general validity and efficiency of the operating rules have been proved in a case study (a multi-purpose reservoir) and a fictitious lake.

  16. Management aspects of Gemini's base facility operations project

    Arriagada, Gustavo; Nitta, Atsuko; Adamson, A. J.; Nunez, Arturo; Serio, Andrew; Cordova, Martin

    2016-08-01

    Gemini's Base Facilities Operations (BFO) Project provided the capabilities to perform routine nighttime operations without anyone on the summit. The expected benefits were to achieve money savings and to become an enabler of the future development of remote operations. The project was executed using a tailored version of Prince2 project management methodology. It was schedule driven and managing it demanded flexibility and creativity to produce what was needed, taking into consideration all the constraints present at the time: Time available to implement BFO at Gemini North (GN), two years. The project had to be done in a matrix resources environment. There were only three resources assigned exclusively to BFO. The implementation of new capabilities had to be done without disrupting operations. And we needed to succeed, introducing the new operational model that implied Telescope and instrumentation Operators (Science Operations Specialists - SOS) relying on technology to assess summit conditions. To meet schedule we created a large number of concurrent smaller projects called Work Packages (WP). To be reassured that we would successfully implement BFO, we initially spent a good portion of time and effort, collecting and learning about user's needs. This was done through close interaction with SOSs, Observers, Engineers and Technicians. Once we had a clear understanding of the requirements, we took the approach of implementing the "bare minimum" necessary technology that would meet them and that would be maintainable in the long term. Another key element was the introduction of the "gradual descent" concept. In this, we increasingly provided tools to the SOSs and Observers to prevent them from going outside the control room during nighttime operations, giving them the opportunity of familiarizing themselves with the new tools over a time span of several months. Also, by using these tools at an early stage, Engineers and Technicians had more time for debugging

  17. LHC Magnet Tests Operational Techniques and Empowerment for Successful Completion

    Chohan, V; Priestnall, K; Pirotte, F; Veyrunes, E; Ali, N; Awale, P; Bahuguna, S; Bhunia, U; Chauhan, V; Dixit, M; Gore, J; John, J; Kandaswamy, E; Kasbekar, A; Kashyap, P; Kasliwal, A; Kulkarni, C; Laddha, A; Malhotra, S; Mascarenhas, M; Mishra, J; Motiwala, P; Nair, K; Narayanan, R; Padmakumar, S; Pagare, A; Peruppayikkad, D; Raghunathan, S; Rao, S; Roy, D; Sharma, S; Shimjith, S; Singh, S; Sonnis, S; Sridhar, S; Surendran, P; Tikaria, A

    2007-01-01

    The LHC magnet tests operation team developed various innovative techniques, particularly since early 2004, to complete the superconductor magnet tests by Feb. 2007. Overall and cryogenic priority handling, rapid on-bench thermal cycling, rule-based goodness evaluation on round-the-clock basis, multiple, mashed web systems are some of these techniques applied with rigour for successful tests completion in time. This paper highlights these operation empowerment tools which had a pivotal role for success. A priority handling method was put in place to enable maximum throughput from twelve test benches, having many different constraints. For the cryogenics infrastructure, it implied judicious allocation of limited resources to the benches. Rapid On-Bench Thermal Cycle was a key strategy to accelerate magnets tests throughput, saving time and simplifying logistics. First level magnet appraisal was developed for 24 hr decision making so as to prepare a magnet further for LHC or keep it on standby. Web based system...

  18. Operation and maintenance techniques of cranes and Hoist in IMEF

    Soong, Woong Sup; Oh, Yon Woo; Ahn, Sang Bock; Park, Dae Gue; Whang, Ryoung Wha

    1999-07-01

    Crane and hoist of 11 sets are installed int the Irradiated Material Examination Facility (IMEF). IMEF is divided into two parts such as hot cell area and service area. 30/5-ton overhead crane is installed in service area for transfer of irradiated material transportation cask and other several kinds of heavy equipment. This report describes maintenance techniques, repair procedure, daily and special checking list, which will ensure safety in routine operation and even in abnormality. (author). 8 refs

  19. Operation and maintenance techniques of cranes and Hoist in IMEF

    Soong, Woong Sup; Oh, Yon Woo; Ahn, Sang Bock; Park, Dae Gue; Whang, Ryoung Wha

    1999-07-01

    Crane and hoist of 11 sets are installed int the Irradiated Material Examination Facility (IMEF). IMEF is divided into two parts such as hot cell area and service area. 30/5-ton overhead crane is installed in service area for transfer of irradiated material transportation cask and other several kinds of heavy equipment. This report describes maintenance techniques, repair procedure, daily and special checking list, which will ensure safety in routine operation and even in abnormality. (author). 8 refs.

  20. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  1. Vestibuloplasty: a retrospective study on conventional and laser operation techniques

    Neckel, Claus P.

    1999-05-01

    40 patients with edentulous maxillary jaws were referred to our private practice limited to maxillofacial surgery, due to atrophy of the alveolar ridge. Before prosthetic renewal of the upper removable prosthesis the restorative dentist requested a sufficient vestibule. After supraperiostal preparation, soft tissue advancement and fixation with absorbable sutures. The recipient site was covered with a free gingival graft. Group I was operated on traditionally using a scalpel. In group II incision and soft tissue preparation was performed using a diode laser. Wavelength: 810 nm; Continuous wave mode; 400 micron optic fiber; Output power 1.6 Watt. All operations were performed by one surgeon experienced in both operation techniques. Every patient was followed-up 1, 4, 8 weeks, 6 and 12 months. The vestibular height directly adjacent to the nasal cavity and 2cm distal to these first measuring locations were taken. Each patient was asked to evaluate their individual discomfort and postoperative pain level. Both groups showed no significant difference in vestibular height after 1, 4, 8 weeks, 6 months and 1 year. The postoperative height of 1.28 cm was reduced to 0.84 cm after 1 year. Furthermore both groups showed uneventful healing and take of the free gingival grafts. The assessment of the pain and discomfort level by the patients brought a significant difference between both groups in favor of the laser assisted operation technique.

  2. Mathematical foundations of the projection-operator method

    Moore, S.M.

    1979-01-01

    Mathematical foundations are determined for the projection-operator method developed by Zwanzig and Mori and used in the study of cooperative phenomena in non-equilibrium processes. It is shown that the Hilbert space of operators can be taken as the Hilbert-Schmidt class. Comments are made on the possibility of a complete formulation of quantum mechanics in terms of this Hilbert space. (author)

  3. Techniques for Field Operation of Straddle-packer System in Deep Borehole

    Kim, Kyung Su; Park, Kyung Woo; Kim, Geon Young; Ji, Sung Hoon; Koh, Yong Kwon; Choi, Jong Won

    2010-05-01

    It is necessary to establish an appropriate hydro-testing tool for the qualified characterization of deep geological environments, especially for the hydraulic properties of rock formation. This research project had been initiated for the purpose of establishment of advanced infra-structures in KURT. The straddle packer system was developed for hydraulic characterization of geological formation using deep borehole. This technical report consists of design concept, basic requirements, function of each part, field operation procedures and techniques, detail design drawings, and specifications. The qualified hydro-testing tool, which is suitable for medium to low permeable formation, using large and deep borehole, has been developed. This tool will be applied for the research project on development of HLW disposal technologies and the site characterization activities of LILW disposal project. Prior to field operation using this hydro-testing equipment, every researchers should be well acquainted with this technical report

  4. Minimum intensity projection technique in the evaluation of pulmonary emphysema

    Ishii, Chikako; Tada, Shinpei; Fukuda, Kunihiko; Hayashi, Naganobu

    2000-01-01

    Clinically diagnosed 30 pulmonary emphysema patients were evaluated with helical CT. From 10 mm thickness and 10 mm/sec table speed helical CT date set, minimum intensity projection (Min-IP) were generated. Min-IP coronal images were well demonstrated distribution and degree of emphysema. Compared to the high resolution CT images (2 mm thickness), Min-IP images were as same as well evaluated the disease. Min-IP technique seem to be useful for evaluate distribution and degree of pulmonary emphysema. (author)

  5. Projection-iteration methods for solving nonlinear operator equations

    Nguyen Minh Chuong; Tran thi Lan Anh; Tran Quoc Binh

    1989-09-01

    In this paper, the authors investigate a nonlinear operator equation in uniformly convex Banach spaces as in metric spaces by using stationary and nonstationary generalized projection-iteration methods. Convergence theorems in the strong and weak sense were established. (author). 7 refs

  6. Developments in operator assistance techniques for nuclear power plant control and operation

    Poujol, A.; Papin, B.; Beltranda, G.; Soldermann, R.

    1989-01-01

    This paper describes an approach which has been developed in order to improve nuclear power plants control and monitoring in normal and abnormal situations. These developments take full advantage of the trend towards the computerization of control rooms in industrial continuous processes. This research program consists in a thorough exploration of different information processing techniques, ranking from the rather simple visual synthetization of informations on graphic displays to sophisticated Artificial Intelligence (AI) techniques. These techniques are put into application for the solving of man-machine interface problems in the different domains of plant operation

  7. The Use of Management Control Systems and Operations Management Techniques

    Edelcio Koitiro Nisiyama

    2016-01-01

    Full Text Available It is well known that both management control systems (MCSs and operations management (OM are related to firm performance; however, an integrated st udy that involves MCS and OM within the context of firm performance is still lacking. This research aimed to examine the relationships among the use of MCSs and OM techniques and firm performance in the Brazilian auto parts industry. Simons’ levers of cont rol framework was used to characterise the uses of MCSs, and OM techniques, such as total quality management (TQM and continuous improvement programmes, were adopted. The results obtained through the structural equation modelling indicated that the diagno stic use of MCSs is positively associated with the goals of cost reduction. In addition, the interactive use of MCSs is positively associated with the objectives of introducing new products, which is consistent with previous research. Additionally, OM tech niques are positively related to cost reduction but have no direct relationship with the introduction of new products.

  8. Environmental Monitoring Techniques and Equipment related to the installation and operation of Marine Energy Conversion Systems

    Scanu, Sergio; Carli, Filippo Maria; Piermattei, Viviana; Bonamano, Simone; Paladini de Mendoza, Francesco; Marcelli, Marco; Peviani, Maximo Aurelio; Dampney, Keith; Norris, Jennifer

    2015-01-01

    Results of activities under project Marine Renewables Infrastructure Network for Emerging Energy Technologies (MaRINET) are reported, which led to DEMTE, a database, created on the basis of standardized monitoring of the marine environment during installation, operation and decommissioning of Marine Energy Conversion Systems. Obtained with the consortium partners’ available techniques and equipment, the database shows that such instruments cover all identified marine environmental compartments, despite the lack of underwater vehicles and the reduced skills in using satellite technologies. These weaknesses could be overcome by an accurate planning of equipment, techniques and knowledge sharing. The approach here presented also leads to an effective analysis even in non-marine contexts

  9. Method for plant operation guidance by knowledge engineering technique

    Kiguchi, Takashi; Yoshida, Kenichi; Motoda, Hiroshi; Kobayashi, Setsuo

    1983-01-01

    A method for plant operation guidance has been developed by using the Knowledge Engineering technique. The method is characterized by its capability of handling plant dynamics. The knowledge-base includes plant simulation programs as tools to evaluate dynamic behaviors as well as production rules of ''if..., then...'' type. The inference engine is thus capable of predicting plant dynamics and making decisions in accordance with time progress. The performance of the guidance method was evaluated by simulation tests assuming various abnormal situations of a BWR power plant. It was shown that the method can detect each of the abnormal events along the course of their occurrence, and provide the guidance for corrective actions. The operation guidance method proposed in this paper is general and is applicable not only to nuclear power plants but also to other plants such as chemical production plants and fossile power plants. (author)

  10. The Heliospheric Cataloguing, Analysis and Techniques Service (HELCATS) project

    Barnes, D.; Harrison, R. A.; Davies, J. A.; Perry, C. H.; Moestl, C.; Rouillard, A.; Bothmer, V.; Rodriguez, L.; Eastwood, J. P.; Kilpua, E.; Gallagher, P.; Odstrcil, D.

    2017-12-01

    Understanding solar wind evolution is fundamental to advancing our knowledge of energy and mass transport in the solar system, whilst also being crucial to space weather and its prediction. The advent of truly wide-angle heliospheric imaging has revolutionised the study of solar wind evolution, by enabling direct and continuous observation of both transient and background components of the solar wind as they propagate from the Sun to 1 AU and beyond. The recently completed, EU-funded FP7 Heliospheric Cataloguing, Analysis and Techniques Service (HELCATS) project (1st May 2014 - 30th April 2017) combined European expertise in heliospheric imaging, built up over the last decade in particular through leadership of the Heliospheric Imager (HI) instruments aboard NASA's STEREO mission, with expertise in solar and coronal imaging as well as the interpretation of in-situ and radio diagnostic measurements of solar wind phenomena. HELCATS involved: (1) the cataloguing of transient (coronal mass ejections) and background (stream/corotating interaction regions) solar wind structures observed by the STEREO/HI instruments, including estimates of their kinematic properties based on a variety of modelling techniques; (2) the verification of these kinematic properties through comparison with solar source observations and in-situ measurements at multiple points throughout the heliosphere; (3) the assessment of the potential for initialising numerical models based on the derived kinematic properties of transient and background solar wind components; and (4) the assessment of the complementarity of radio observations (Type II radio bursts and interplanetary scintillation) in the detection and analysis of heliospheric structure in combination with heliospheric imaging observations. In this presentation, we provide an overview of the HELCATS project emphasising, in particular, the principal achievements and legacy of this unprecedented project.

  11. Projection Operators and Moment Invariants to Image Blurring

    Flusser, Jan; Suk, Tomáš; Boldyš, Jiří; Zitová, Barbara

    2015-01-01

    Roč. 37, č. 4 (2015), s. 786-802 ISSN 0162-8828 R&D Projects: GA ČR GA13-29225S; GA ČR GAP103/11/1552 Institutional support: RVO:67985556 Keywords : Blurred image * N-fold rotation symmetry * projection operators * image moments * moment invariants * blur invariants * object recognition Subject RIV: JD - Computer Applications, Robotics Impact factor: 6.077, year: 2015 http://library.utia.cas.cz/separaty/2014/ZOI/flusser-0434521.pdf

  12. Spent Nuclear Fuel Project Cold Vacuum Drying Facility Operations Manual

    IRWIN, J.J.

    1999-01-01

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, (Cold Vacuum Drying Facility Design Requirements), Rev. 4. and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  13. Efficient operating system level virtualization techniques for cloud resources

    Ansu, R.; Samiksha; Anju, S.; Singh, K. John

    2017-11-01

    Cloud computing is an advancing technology which provides the servcies of Infrastructure, Platform and Software. Virtualization and Computer utility are the keys of Cloud computing. The numbers of cloud users are increasing day by day. So it is the need of the hour to make resources available on demand to satisfy user requirements. The technique in which resources namely storage, processing power, memory and network or I/O are abstracted is known as Virtualization. For executing the operating systems various virtualization techniques are available. They are: Full System Virtualization and Para Virtualization. In Full Virtualization, the whole architecture of hardware is duplicated virtually. No modifications are required in Guest OS as the OS deals with the VM hypervisor directly. In Para Virtualization, modifications of OS is required to run in parallel with other OS. For the Guest OS to access the hardware, the host OS must provide a Virtual Machine Interface. OS virtualization has many advantages such as migrating applications transparently, consolidation of server, online maintenance of OS and providing security. This paper briefs both the virtualization techniques and discusses the issues in OS level virtualization.

  14. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    Doyle, E. Kevin

    2002-01-01

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at

  15. Operative Fixation of Rib Fractures Indications, Techniques, and Outcomes.

    Galos, David; Taylor, Benjamin; McLaurin, Toni

    2017-01-01

    Rib fractures are extremely common injuries and vary in there severity from single nondisplaced fractures to multiple segmental fractures resulting in flail chest and respiratory compromise. Historically, rib fractures have been treated conservatively with pain control and respiratory therapy. However this method may not be the best treatment modality in all situations. Operative fixation of select rib fractures has been increasing in popularity especially in patients with flail chest and respiratory compromise. Newer techniques use muscle sparing approaches and precontoured locking plate technology to obtain stable fixation and allow improved respiration. Current reports shows that rib fracture fixation offers the benefits of improved respiratory mechanics and improved pain control in the severe chest wall injury with resultant improvement in patient outcomes by decreasing time on the ventilator, time in the intensive care unit, and overall hospital length of stay.

  16. Steady-state operation of spheromaks by inductive techniques

    Janos, A.

    1984-04-01

    A method to maintain a steady-state spheromak configuration inductively using the S-1 Spheromak device is described. The S-1 Spheromak formation apparatus can be utilized to inject magnetic helicity continuously (C.W., not pulsed or D.C.) into the spheromak configuration after equilibrium is achieved in the linked mode of operation. Oscillation of both poloidal- and toroidal-field currents in the flux core (psi-phi Pumping), with proper phasing, injects a net time-averaged helicity into the plasma. Steady-state maintenance relies on flux conversion, which has been earlier identified. Relevant experimental data from the operation of S-1 are described. Helicity flow has been measured and the proposed injection scheme simulated. In a reasonable time practical voltages and frequencies can inject an amount of helicity comparable to that in the initial plasma. Plasma currents can be maintained or increased. This pumping technique is similar to F-THETA Pumping of a Reversed-Field-Pinch but is applied to this inverse-pinch formation

  17. Cooperative project on methods and techniques for assessment of ageing and safety of nuclear objects

    Bundara, B.; Udovc, M.; Cvelbar, R.; Vojvodic Tuma, J.; Celin, R.; Cizelj, L.; Simonovski, I.; Pirs, B.; Zabric, I.

    2007-01-01

    Nuclear Power Plants are so far the most demanding electric power plants concerning the extent and complexity of knowledge that is needed for design, construction, installation, safe operation and proper maintenance. For safe operation of the NPP it is important to have reliable inspection procedures and methods to detect the relevant defects in the components. It is also important to have effective techniques and efficient methodology that enable precise estimation of the material degradation and reliable prediction of the remaining period of the safe service of structures and components. During the operation of NPP its materials, structures and components are exposed to various impacts that have for the result changes in the material. Changes usually manifest as deviation from the origin (generally considered as defects) and can be observed at level of microstructure and/or at structural level. Defects are consequence of ageing and ageing is a consequence of mechanical, thermal, chemical, radiation induced and other processes. Complexity of the NPP and continuous operation at high level of safety demands extensive cooperation of researchers and engineers with different scientific and educational background. In the paper is discussed the importance of sufficient support to the NPP related research projects and the need for cooperation between institutes. As an example is presented the cooperative project that bands the research groups with different scientific background into complementary team working on multidisciplinary project focused on assessment of ageing and safety of nuclear objects. (author)

  18. Magellan Project: Evolving enhanced operations efficiency to maximize science value

    Cheuvront, Allan R.; Neuman, James C.; Mckinney, J. Franklin

    1994-01-01

    Magellan has been one of NASA's most successful spacecraft, returning more science data than all planetary spacecraft combined. The Magellan Spacecraft Team (SCT) has maximized the science return with innovative operational techniques to overcome anomalies and to perform activities for which the spacecraft was not designed. Commanding the spacecraft was originally time consuming because the standard development process was envisioned as manual tasks. The Program understood that reducing mission operations costs were essential for an extended mission. Management created an environment which encouraged automation of routine tasks, allowing staff reduction while maximizing the science data returned. Data analysis and trending, command preparation, and command reviews are some of the tasks that were automated. The SCT has accommodated personnel reductions by improving operations efficiency while returning the maximum science data possible.

  19. Telerobotic Perception During Asteroid and Mars Regolith Operations Project

    Gaddis, Steven; Zeitlin, Nancy (Compiler); Mueller, Robert (Compiler)

    2015-01-01

    Current space telerobotic systems are constrained to only operating in bright light and dust-free conditions. This project will study the effects of difficult lighting and dust conditions on telerobotic perception systems to better assess and refine regolith operations on other neighboring celestial bodies. In partnership with Embry-Riddle Aeronautical University and Caterpillar, Inc., optical, LiDAR and RADAR sensing equipment will be used in performing the study. This project will create a known dust environment in the Swamp Works Granular Mechanics & Regolith Operations (GMRO) Laboratory regolith test bin to characterize the behavior of the sensing equipment in various calibrated lighting and dust conditions. It will also identify potential methods for mitigating the impacts of these undesirable conditions on the performance of the sensing equipment. Enhancing the capability of telerobotic perception systems will help improve life on earth for those working in dangerous, dusty mining conditions, as well as help advance the same technologies used for safer self-driving automobiles in various lighting and weather conditions. It will also prove to be a critical skill needed for advancing robotic and human exploration throughout our solar system, for activities such as mining on an asteroid or pioneering the first colony on Mars.

  20. Projection computation based on pixel in simultaneous algebraic reconstruction technique

    Wang Xu; Chen Zhiqiang; Xiong Hua; Zhang Li

    2005-01-01

    SART is an important arithmetic of image reconstruction, in which the projection computation takes over half of the reconstruction time. An efficient way to compute projection coefficient matrix together with memory optimization is presented in this paper. Different from normal method, projection lines are located based on every pixel, and the following projection coefficient computation can make use of the results. Correlation of projection lines and pixels can be used to optimize the computation. (authors)

  1. Implementation plan for the Operations Center Upgrade project

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  2. OECD/NEA component operational experience, degradation and ageing project

    Gott, K.; Nevander, O.; Riznic, J.; Lydell, B.

    2015-01-01

    Several OECD Member Countries have agreed to establish the OECD/NEA 'Component Operational Experience, Degradation and Ageing Programme' (CODAP) to encourage multilateral co-operation in the collection and analysis of data relating to degradation and failure of metallic piping and non-piping metallic passive components in commercial nuclear power plants. The scope of the data collection includes service-induced wall thinning, part through-wall cracks, through-wall cracks with and without active leakage, and instances of significant degradation of metallic passive components, including piping pressure boundary integrity. CODAP is the continuation of the 2002-2011 'OECD/NEA Pipe Failure Data Exchange Project' (OPDE) and the Stress Corrosion Cracking Working Group of the 2006-2010 - OECD/NEA SCC and Cable Ageing project - (SCAP). OPDE was formally launched in May 2002. Upon completion of the 3. Term (May 2011), the OPDE project was officially closed to be succeeded by CODAP. In May 2011, 13 countries signed the CODAP first Term agreement. The first Term (2011-2014) work plan includes the development of a web-based relational event database on passive, metallic components in commercial nuclear power plants, a web-based knowledge base on material degradation, codes and standards relating to structural integrity and national practices for managing material degradation. The work plan also addresses the preparation of Topical Reports to foster technical cooperation and to deepen the understanding of national differences in ageing management. These Topical Reports are in the public domain and available for download on the NEA web site. Published in 2014, a first Topical Report addressed flow accelerated corrosion (FAC) of carbon steel and low alloy steel piping. A second Topical Report addresses operating experience with electro-hydraulic control (EHC) and instrument air (IA) system piping

  3. FUNCTIONAL MODEL OF THE MATERIAL RESOURCES MANAGEMENT FOR PROJECTS OF THE CREATION OF NEW TECHNIQUES

    S. Yu. Danshyna

    2016-01-01

    Full Text Available The article is devoted to problem of material management arising in the implementation of projects for the development and creation (modernization of the new techniques. The uniqueness of the projects, their limit on the cost and time does not allow the use of traditional approaches to resource management. Such projects are often implemented in the development of companies; where it is not possible to abandon the traditional operating methods of management. The aim of the article is a formalization of the process of material management of projects, a description of its information flows for integrate into the project management practices and for improve the efficiency of material management. For the systematization of information arising from the material resources management, invited the set-theoretic representation of the management process. According with the requirements of project management standards were described the sets and defined rules of their transformation. Specification of the set-theoretic representation helped to establish the area and limits of the modelling process. Further decomposition process became the basis of the functional model, constructed in accordance with the methodology IDEF 0. A graphical representation of the model allows you to visualize the process at different levels of detail. For specification of issues related to the organization and promotion of material flow, were developed functional models of sub-processes and were described the identified data-flows. For the harmonization of process and project approaches formulated conditions for evaluating the efficiency of material management. The developed models can be the basis for designing the structure of companies, for regulation of their project activities, as well as for establishing an information system of management resources of projects.

  4. Risk Management Technique for design and operation of facilities and equipment

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De S.

    1975-01-01

    The Risk Management System collects information from engineering, operating, and management personnel to identify potentially hazardous conditions. This information is used in risk analysis, problem resolution, and contingency planning. The resulting hazard accountability system enables management to monitor all identified hazards. Data from this system are examined in project reviews so that management can decide to eliminate or accept these risks. This technique is particularly effective in improving the management of risks in large, complex, high-energy facilities. These improvements are needed for increased cooperation among industry, regulatory agencies, and the public.

  5. Cutting techniques for facilities dismantling in decommissioning projects

    Lainetti, Paulo E.O.

    2011-01-01

    Fuel cycle related activities were accomplished in IPEN-CNEN/SP in laboratory and pilot plant scale and most facilities were built in the 70-80 years. Nevertheless, radical changes of the Brazilian nuclear policy in the beginning of 90's determined the interruption of several fuel cycle activities and facilities shutdown. Some laboratory and pilot plant decommissioning activities have been performed in IPEN in the last years. During the operational activities in the decommissioning of old nuclear fuel cycle facilities, the personnel involved in the task had to face several problems. In old facilities, the need of large components dismantling and material removal use to present some difficulties, such as lack of available and near electricity supply. Besides this, the spread out of the superficial contamination in the form of dust or aerosols and the exposure of workers should be as much as possible avoided. Then, the selection and availability of suitable tools for the task, mainly those employed for cutting and segmentation of different materials is of significant importance. Slight hand tools, mainly those powered by rechargeable batteries, facilitate the work, especially in areas where the access is difficult. Based on the experience in the dismantling of some old nuclear facilities of IPEN-CNEN/SP, some tools that would have facilitated the operations were identified and their availability could have improved the quality and efficiency of different individual tasks. In this paper different cutting problems and techniques, as well as some available commercial hand tools, are presented as suggestion for future activities. (author)

  6. Operational test report - Project W-320 cathodic protection systems

    Bowman, T.J.

    1998-01-01

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems

  7. Application of Operational Research Techniques in Operating Room Scheduling Problems: Literature Overview

    Şeyda Gür

    2018-01-01

    Full Text Available Increased healthcare costs are pushing hospitals to reduce costs and increase the quality of care. Operating rooms are the most important source of income and expense for hospitals. Therefore, the hospital management focuses on the effectiveness of schedules and plans. This study includes analyses of recent research on operating room scheduling and planning. Most studies in the literature, from 2000 to the present day, were evaluated according to patient characteristics, performance measures, solution techniques used in the research, the uncertainty of the problem, applicability of the research, and the planning strategy to be dealt within the solution. One hundred seventy studies were examined in detail, after scanning the Emerald, Science Direct, JSTOR, Springer, Taylor and Francis, and Google Scholar databases. To facilitate the identification of these studies, they are grouped according to the different criteria of concern and then, a detailed overview is presented.

  8. Project Administration Techniques for Successful Classroom Collaborative Writing.

    Kryder, LeeAnne Giannone

    1991-01-01

    Focuses on the collaborative writing done for a large report or proposal over a period of several weeks or months in a business writing course. Discusses short-term writing projects and nonwriting tasks for project administration, meeting management, student/instructor conference, project planning and time estimates, and oral presentations. (PRA)

  9. Reducing Projection Calculation in Quantum Teleportation by Virtue of the IWOP Technique and Schmidt Decomposition of |η〉 State

    FAN Hong-Yi; FAN Yue

    2002-01-01

    By virtue of the technique of integration within an ordered product of operators and the Schmidt decomposition of the entangled state |η〉, we reduce the general projection calculation in the theory of quantum teleportation to a as simple as possible form and present a general formalism for teleportating quantum states of continuous variable.

  10. Comparative study between two operative techniques of pilonidal ...

    bbshehu

    technique has definite advantages over sinus excision and marsupialisation technique. It needed a ... hospital stay with reduction on postoperative pain and early resumption to work. .... the first 5 days and thereafter as and when the patient felt.

  11. Application of value engineering technique in construction project

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  12. Information systems project management: methods, tools, and techniques

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  13. Information exchange mainly on HTGR operation and maintenance technique between JAEA and INET in 2005

    Tachibana, Yukio; Hino, Ryutaro; Yu Suyuan

    2006-06-01

    The worldwide interests in the HTGR (High Temperature Gas-cooled Reactor) have been growing because the high temperature heat produced by the reactor can be utilized not only for efficient power generation but also for broad process heat applications, especially for thermo-chemical hydrogen production to fuel a prospective hydrogen economy in future. Presently only two HTGR reactors are operational in the world, including the HTTR (High Temperature Engineering Test Reactor) in Japan Atomic Energy Agency (JAEA) and the HTR-10 in the Institute of Nuclear and New Energy Technology (INET) of Tsinghua University in China. JAEA and INET have cooperated since 1986 in the field of HTGR development, particularly on the HTTR and HTR-10 projects. This report describes the cooperation with emphasis on HTGR operation and maintenance techniques between JAEA and INET and outlines cooperation activities during the fiscal year 2005. (author)

  14. Summary of field operations Technical Area I well PGS-1. Site-Wide Hydrogeologic Characterization Project

    Fritts, J.E.; McCord, J.P.

    1995-02-01

    The Environmental Restoration (ER) Project at Sandia National Laboratories, New Mexico is managing the project to assess and, when necessary, to remediate sites contaminated by the lab operations. Within the ER project, the site-wide hydrogeologic characterization task is responsible for the area-wide hydrogeologic investigation. The purpose of this task is to reduce the uncertainty about the rate and direction of groundwater flow beneath the area and across its boundaries. This specific report deals with the installation of PGS-1 monitoring well which provides information on the lithology and hydrology of the aquifer in the northern area of the Kirtland Air Force Base. The report provides information on the well design; surface geology; stratigraphy; structure; drilling, completion, and development techniques; and borehole geophysics information

  15. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  16. Investigation of objective evaluation system of anatomical knowledge and operative techniques in education for rhinologic surgery

    Ishimasa, Hiroshi; Murata, Hideyuki

    2006-01-01

    Operative technique and approach method for the nasal and paranasal sinuses, areas of anatomical complexity and high individual variation, have been transformed dramatically in recent years with the introduction of the endoscope. However, due to surgeons' unfamiliarity with the technique and anatomical misidentification, medical errors show no sign of significant decline. As endoscopic sinus surgery (ESS) is an indirect operating procedure, conducted while watching a video monitor, it is necessary for the surgeon to become accustomed to the special properties of the endoscope, namely, the lack of perspective projection. Until now, surgical training has made repetitive use of video material and donated cadavers for skill practice, and a system of one-to-one instruction whereby instruction is received from a lead surgeon while the learner joins the actual procedure as an assistant. That is to say, there has been no objective method of evaluating individual proficiency until now. In our study, evaluation of individual anatomical knowledge and thought process until task completion, objective evaluation of surgical instrument handling and technique, and evaluation of knowledge required in actual surgeries are discussed Then an individually responsive method of surgical instruction with self-evaluation and self-cognition will be sought. (author)

  17. Nevada Renewable Energy Training Project: Geothermal Power Plant Operators

    Jim, Nichols [Truckee Meadows Community College, Reno, NV (United States)

    2014-04-29

    The purpose of this project was to develop and institute a training program for certified geothermal power plant operators (GPO). An advisory board consisting of subject matter experts from the geothermal energy industry and academia identified the critical skill sets required for this profession. A 34-credit Certificate of Achievement (COA), Geothermal Power Plant Operator, was developed using eight existing courses and developing five new courses. Approval from the Nevada System of Higher Education Board of Regents was obtained. A 2,400 sq. ft. geothermal/fluid mechanics laboratory and a 3,000 sq. ft. outdoor demonstration laboratory were constructed for hands-on training. Students also participated in field trips to geothermal power plants in the region. The majority of students were able to complete the program in 2-3 semesters, depending on their level of math proficiency. Additionally the COA allowed students to continue to an Associate of Applied Science (AAS), Energy Technologies with an emphasis in Geothermal Energy (26 additional credits), if they desired. The COA and AAS are stackable degrees, which provide students with an ongoing career pathway. Articulation agreements with other NSHE institutions provide students with additional opportunities to pursue a Bachelor of Applied Science in Management or Instrumentation. Job placement for COA graduates has been excellent.

  18. Hardware and software techniques for boiler operation and management

    Kobayashi, Hiroshi (Hirakawa Iron Works, Ltd., Osaka (Japan))

    1989-04-01

    A study was conducted on the requirements for easy-operable boiler from the view points of hardware and software technologies. Relation among efficiency, energy-saving, and economics, and control of total emission regarding low NOx operation, were explained, with suggestion of orientation to developed necessary hard- and soft- ware for the realization. 8 figs.

  19. Project cost estimation techniques used by most emerging building ...

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  20. Incomplete projection reconstruction of computed tomography based on the modified discrete algebraic reconstruction technique

    Yang, Fuqiang; Zhang, Dinghua; Huang, Kuidong; Gao, Zongzhao; Yang, YaFei

    2018-02-01

    Based on the discrete algebraic reconstruction technique (DART), this study aims to address and test a new improved algorithm applied to incomplete projection data to generate a high quality reconstruction image by reducing the artifacts and noise in computed tomography. For the incomplete projections, an augmented Lagrangian based on compressed sensing is first used in the initial reconstruction for segmentation of the DART to get higher contrast graphics for boundary and non-boundary pixels. Then, the block matching 3D filtering operator was used to suppress the noise and to improve the gray distribution of the reconstructed image. Finally, simulation studies on the polychromatic spectrum were performed to test the performance of the new algorithm. Study results show a significant improvement in the signal-to-noise ratios (SNRs) and average gradients (AGs) of the images reconstructed from incomplete data. The SNRs and AGs of the new images reconstructed by DART-ALBM were on average 30%-40% and 10% higher than the images reconstructed by DART algorithms. Since the improved DART-ALBM algorithm has a better robustness to limited-view reconstruction, which not only makes the edge of the image clear but also makes the gray distribution of non-boundary pixels better, it has the potential to improve image quality from incomplete projections or sparse projections.

  1. Advanced operating technique using the VR database system

    Lee, Il-Suk; Yoon, Sang-Hyuk; Suh, Kune Y.

    2003-01-01

    For the timely and competitive response to rapidly changing energy environment in the twenty-first century, there is a growing need to build the advanced nuclear power plants in the unlimited workspace of virtual reality (VR) prior to commissioning. One can then realistically evaluate their construction time and cost per varying methods and options available from the leading-edge technology. In particular, a great deal of efforts have yet to be made for time- and cost-dependent plant simulation and dynamically coupled database construction in the VR space. The present work is being proposed in the three-dimensional space and time plus cost coordinates, i.e. four plus dimensional (4 + D) coordinates. The 4 + D VR technology TM will help the preliminary VR simulation capability for the plants will supply the vital information not only for the actual design and construction of the engineered structures but also for the on-line design modification. Quite a few companies and research institutions have supplied various information services to the nuclear market. A great deal of the information exists in the form of reports, articles, books, which are just kind of simple texts and graphic images. But if very large and important information transfer methods are developed for the nuclear plants by means of the 4 + D technology database, they will tend to greatly benefit the designers, manufacturers, users and even the public. Moreover, one can understand clearly the total structure of the nuclear plants if the 4 + D VR technology TM database operates together with the transient analysis simulator. This technique should be available for public information about the nuclear industry as well as nuclear plant structure and components. By using the 4 + D VR technology TM one can supply the information to users which couldn't have been expressed by the existing technology. Users can not only spin or observe closely the structural elements by simple mouse control, but also know

  2. Projection operator approach to the self-energy

    Capuzzi, F.; Mahaux, C.

    1996-01-01

    Feshbach close-quote s projection operator formalism is extended to the description of the self-energy. This necessitates the introduction of open-quote open-quote extended close-quote close-quote projection operators. They act within an open-quote open-quote extended close-quote close-quote Hilbert space in which the number of nucleons is not fixed. The compact formula derived for the self-energy is formally similar to Feshbach close-quote s original expression of the open-quote open-quote generalized close-quote close-quote optical-model potential. The theory is formulated in the nuclear case, but it also applies to atomic systems. It covers both the open-quote open-quote retarded close-quote close-quote and the open-quote open-quote time-ordered close-quote close-quote Green close-quote s functions, and the open-quote open-quote proper close-quote close-quote and open-quote open-quote improper close-quote close-quote self-energies. It is first worked out in a stationary formalism, in order to better exhibit its analogy with Feshbach close-quote s original theory of the generalized optical-model potential. The main results are then also derived in a time-dependent framework. It is shown that, in finite systems, Dyson close-quote s equation does not uniquely determine the self-energy, in contrast to common assumption. However, the difference between the various possibilities has little practical consequence. We exhibit the relationship between the present approach and a recent open-quote open-quote configuration interaction formulation of the Dyson equation.close-quote close-quote Contact is also established with the open-quote open-quote linked-cluster close-quote close-quote perturbation expansion of the self-energy in powers of the strength of the nucleon endash nucleon interaction. Copyright copyright 1996 Academic Press, Inc

  3. Optimal fringe angle selection for digital fringe projection technique.

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  4. Distinct solutions of infinite U Hubbard model through nested Bethe ansatz and Gutzwiller projection operator approach

    Mishra, A.K.; Kishore, R.

    2009-01-01

    The exact nested Bethe ansatz solution for the one dimensional (1-D) U infinity Hubbard model show that the state vectors are a product of spin-less fermion and spin wavefunctions, or an appropriate superposition of such factorized wavefunctions. The spin-less fermion component of the wavefunctions ensures no double occupancy at any site. It had been demonstrated that the nested Bethe ansatz wavefunctions in the U infinity limit obey orthofermi statistics. Gutzwiller projection operator formalism is the another well known technique employed to handle U infinity Hubbard model. In general, this approach does not lead to spin-less fermion wavefunctions. Therefore, the nested Bethe ansatz and Gutzwiller projection operator approach give rise to different kinds of the wavefunctions for the U infinity limit of 1-D Hubbard Hamiltonian. To compare the consequences of this dissimilarity in the wavefunctions, we have obtained the ground state energy of a finite system consisting of three particles on a four site closed chain. It is shown that in the nested Bethe ansatz implemented through orthofermion algebra, all the permissible 2 3 spin configurations are degenerate in the ground state. This eight fold degeneracy of the ground state is absent in the Gutzwiller projection operator approach. This finding becomes relevant in the context of known exact U infinity results, which require that all the energy levels are 2 N -fold degenerate for an N particle system.

  5. Two-spinor description of massive particles and relativistic spin projection operators

    A.P. Isaev

    2018-04-01

    Full Text Available On the basis of the Wigner unitary representations of the covering group ISL(2,C of the Poincaré group, we obtain spin-tensor wave functions of free massive particles with arbitrary spin. The wave functions automatically satisfy the Dirac–Pauli–Fierz equations. In the framework of the two-spinor formalism we construct spin-vectors of polarizations and obtain conditions that fix the corresponding relativistic spin projection operators (Behrends–Fronsdal projection operators. With the help of these conditions we find explicit expressions for relativistic spin projection operators for integer spins (Behrends–Fronsdal projection operators and then find relativistic spin projection operators for half integer spins. These projection operators determine the numerators in the propagators of fields of relativistic particles. We deduce generalizations of the Behrends–Fronsdal projection operators for arbitrary space–time dimensions D>2.

  6. Two-spinor description of massive particles and relativistic spin projection operators

    Isaev, A. P.; Podoinitsyn, M. A.

    2018-04-01

    On the basis of the Wigner unitary representations of the covering group ISL (2 , C) of the Poincaré group, we obtain spin-tensor wave functions of free massive particles with arbitrary spin. The wave functions automatically satisfy the Dirac-Pauli-Fierz equations. In the framework of the two-spinor formalism we construct spin-vectors of polarizations and obtain conditions that fix the corresponding relativistic spin projection operators (Behrends-Fronsdal projection operators). With the help of these conditions we find explicit expressions for relativistic spin projection operators for integer spins (Behrends-Fronsdal projection operators) and then find relativistic spin projection operators for half integer spins. These projection operators determine the numerators in the propagators of fields of relativistic particles. We deduce generalizations of the Behrends-Fronsdal projection operators for arbitrary space-time dimensions D > 2.

  7. Software-Enabled Project Management Techniques and Their Relationship to the Triple Constraints

    Elleh, Festus U.

    2013-01-01

    This study investigated the relationship between software-enabled project management techniques and the triple constraints (time, cost, and scope). There was the dearth of academic literature that focused on the relationship between software-enabled project management techniques and the triple constraints (time, cost, and scope). Based on the gap…

  8. Project cost estimation techniques used by most emerging building ...

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  9. A Hybrid MCDM Technique for Risk Management in Construction Projects

    Kajal Chatterjee

    2018-02-01

    Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed

  10. The ordering operator technique applied to open systems

    Pedrosa, I.A.; Baseia, B.

    1982-01-01

    A normal ordering technique and the coherent representation are used to discribe the time evolution of an open system of a single oscillator, linearly coupled with an infinite number of reservoir oscillators and it is shown how to include the dissipation and get the exponential decay. (Author) [pt

  11. Optimizing Nuclear Reactor Operation Using Soft Computing Techniques

    Entzinger, J.O.; Ruan, D.; Kahraman, Cengiz

    2006-01-01

    The strict safety regulations for nuclear reactor control make it di±cult to implement new control techniques such as fuzzy logic control (FLC). FLC however, can provide very desirable advantages over classical control, like robustness, adaptation and the capability to include human experience into

  12. Visualization of Minkowski operations by computer graphics techniques

    Roerdink, J.B.T.M.; Blaauwgeers, G.S.M.; Serra, J; Soille, P

    1994-01-01

    We consider the problem of visualizing 3D objects defined as a Minkowski addition or subtraction of elementary objects. It is shown that such visualizations can be obtained by using techniques from computer graphics such as ray tracing and Constructive Solid Geometry. Applications of the method are

  13. Launch vehicle operations cost reduction through artificial intelligence techniques

    Davis, Tom C., Jr.

    1988-01-01

    NASA's Kennedy Space Center has attempted to develop AI methods in order to reduce the cost of launch vehicle ground operations as well as to improve the reliability and safety of such operations. Attention is presently given to cost savings estimates for systems involving launch vehicle firing-room software and hardware real-time diagnostics, as well as the nature of configuration control and the real-time autonomous diagnostics of launch-processing systems by these means. Intelligent launch decisions and intelligent weather forecasting are additional applications of AI being considered.

  14. ¡VAMOS! (Viable Alternative Mine Operating System) - a 'Horizon 2020' project

    Sword, Cameron; Bodo, Balazs; Kapusniak, Stef; Bosman, Frank; Rainbird, Jenny; Silva, Eduardo

    2017-04-01

    The 42-month ¡VAMOS! project (Viable Alternative Mine Operating System, Grant Agreement 642477, www.vamos-project.eu), funded by the EC H2020 Programme, will enable access to high-grade EU reserves of mineral ore-bodies by developing an innovative clean and low visibility mining technique. The project will demonstrate the technological and economic viability of the underwater extraction of metallic mineral deposits which are currently technologically, economically, and environmentally unobtainable. In doing so, ¡VAMOS! hopes to encourage investment in abandoned open-pit mines and prospective mines, helping to put the EU back on a level playing field with the rest of the world in terms of access to strategically important minerals. The ¡VAMOS! concept is defined by a remotely-operated underwater mining vehicle, adapted and improved from existing subsea mining technology. Operating in tandem with an HROV, the mining vehicle will connect to a flexible riser through which slurried mined material will be pumped from the mudline to onshore dewatering facilities via a floating mobile deployment-module, on which will be fitted a bypass system linked to an LIBS, allowing real-time grade-control. Analysis of European and national regulation and stakeholder assessments found there is significant support for developing the technology among local communities and governments. An initial environmental assessment of the potential impact of the innovative mining operation concluded the project has a smaller environmental footprint than conventional mining operations: this is due to factors including the quieter operation and absence of blasting, zero water-table flux, and the higher stripping ratio enabled by higher fluid pressure acting on the sidewalls of the mine. The prototypes are currently in their construction phase following a final design freeze in October 2016. Work is now underway on the foresight visioning, economic evaluation and policy guidelines for the

  15. Variable operator technique and the min-max theorem

    We investigate a variation method where the trial function is generated from the application of a variable operator on a reference function. Two conditions are identified, one for obtaining a maximum and another for a minimum. Although the conditions are easy to understand, the overall formulation is somewhat unusual as ...

  16. Current research projects on traffic conflicts technique studies.

    Hondel, M. van den & and Kraay, J.H.

    1979-01-01

    A review of current research concerning the development, evaluation and use of the traffic conflicts technique is presented. The 32 studies, selected from the IRRD data base, are listed alphabetically by names of countries and under countries by names of research organizations. The IRRD descriptions

  17. Experience of Hungarian model project: 'Strengthening training for operational safety at Paks NPP'

    Kiss, I.

    1998-01-01

    Training of Operational Safety at Paks NPP is described including all the features of the project including namely: description of Paks NPP, its properties and performances; reasons for establishing Hungarian Model Project, its main goals, mentioning Hungarian and IAEA experts involved in the Project, its organization, operation, budget, current status together with its short term and long term impact

  18. The accelerated ISOL technique and the SPIRAL project

    Villari, A.C.C.

    2001-01-01

    The accelerated ISOL technique is presented as an introduction to the present status of the SPIRAL facility. SPIRAL is based on the very high intensity light and heavy ion beams available at GANIL. The facility will deliver radioactive beams with energies in the range between 1.7 A and 25 A MeV. The presently target-ion source production system, as well the new developments undertaken by the target ion-source group at GANIL are presented. (authors)

  19. IMAGE CONSTRUCTION TO AUTOMATION OF PROJECTIVE TECHNIQUES FOR PSYCHOPHYSIOLOGICAL ANALYSIS

    Natalia Pavlova

    2018-04-01

    Full Text Available The search for a solution of automation of the process of assessment of a psychological analysis of the person drawings created by it from an available set of some templates are presented at this article. It will allow to reveal more effectively infringements of persons mentality. In particular, such decision can be used for work with children who possess the developed figurative thinking, but are not yet capable of an accurate statement of the thoughts and experiences. For automation of testing by using a projective method, we construct interactive environment for visualization of compositions of the several images and then analyse

  20. Evaluation of neutron dosimetry techniques for well-logging operations

    Cummings, F.M.; Haggard, D.L.; Endres, G.W.R.

    1985-07-01

    Neutron dose and energy spectral measurements from 241 AmBe and a 14 MeV neutron generator were performed at a well-logging laboratory. The measurement technique included the tissue equivalent proportional counter, multisphere, two types of remmeters and five types of personnel neutron dosimeters. Several source configurations were used to attempt to relate data to field situations. The results of the measurements indicated that the thermoluminescent albedo dosimeter was the most appropriate personnel neutron dosimeter, and that the most appropriate calibration source would be the source normally employed in the field with the calibration source being used in the unmoderated configuration. 7 refs., 35 figs., 14 tabs

  1. The Arnot capacity increase project - An integrated boiler and turbine retrofit by Alstom - Implementation and operational experience

    Davies, Mike; Stephen, Don; Rich, Glyn; Mills, Jeff; Allen, Steve

    2010-09-15

    In cooperation with South African utility giant Eskom, Alstom has undertaken an ambitious project to upgrade the six-unit Arnot Power Station. The objective was to retrofit major plant components in a cost effective manner in order to extend plant life and increase output. This paper will consider the implementation of the project, the challenges overcome and the operational experience subsequently gained. Lessons learned will be identified. Conclusions will be drawn concerning the effectiveness of a comprehensive feasibility study prior to project implementation and the ability of modern design and manufacturing techniques to retrofit older machines, thus releasing latent potential.

  2. An approach to modeling operator's cognitive behavior using artificial intelligence techniques in emergency operating event sequences

    Cheon, Se Woo; Sur, Sang Moon; Lee, Yong Hee; Park, Young Taeck; Moon, Sang Joon

    1994-01-01

    Computer modeling of an operator's cognitive behavior is a promising approach for the purpose of human factors study and man-machine systems assessment. In this paper, the states of the art in modeling operator behavior and the current status in developing an operator's model (MINERVA - NPP) are presented. The model is constructed as a knowledge-based system of a blackboard framework and is simulated based on emergency operating procedures

  3. Enhanced neurorehabilitation techniques in the DVBIC Assisted Living Pilot Project.

    Hoffman, Stuart W; Shesko, Kristina; Harrison, Catherine R

    2010-01-01

    Traumatic Brain Injury has been labeled the "silent epidemic" in our current wars. Both CBO and the RAND reports predict that the costs of these injuries will be both extensive and enduring. The projected costs are based not only upon the loss contribution of these warriors to our economy, but also the long-term medical and assistive care that will be needed to support these veterans for decades to come. Thus, the primary goal of the Assisted Living Pilot Project (ALPP) at the Defense and Veterans Brain Injury Center - Johnstown (DVBIC-J) is to promote the ability of the injured warrior to move from assisted living to living independently and to be self-supporting by providing a continuum of care. To accomplish this goal the DVBIC-J ALPP is providing full set of traditional services (physical, occupational, speech, psychological/cognitive, social/familial, vocational, and spiritual), along with "cutting-edge" rehabilitative treatment technologies. These cutting-edge therapies include transdisciplinary clinical consultations, interactive patient and family counseling, and telemedicine-teleconferencing for clinical evaluations and family/significant other care participation. These services will be available to those who require assisted living through their progression to community re-entry. The ALPP also serves as a vehicle for clinical trials to investigate the effects of an enriched environment (e.g., recreational therapies, massage, multisensory stimulation, etc.) on neurorehabilitation therapy, rural telemedicine for servicemembers with traumatic brain injury, and long-term outcome measures of those who have received neurorehabilitation services at the DVBIC-J site. DVBIC-J is also developing collaborative projects with universities and private industry to create an incubator for new rehabilitation technologies. The technologies that DVBIC-J will be focusing on will include assistive technologies (to assist cognitive, physical, and communicative impairments

  4. Quality Management techniques embedded in Agile Project Development

    Dovleac Raluca

    2017-01-01

    Full Text Available It used to be hard to make your dream come true and start a business but now, thanks to the dotcom boom and the rapid development of emerging technologies everybody has the chance to become the next Steve Jobs. Quality management tools and creativity techniques gave birth to the startup trend that transforms a brilliant idea into an innovative product. A common practice amongst startups is Agile development. In this paper, after analyzing the Agile approach and the tools used to ensure quality for every stage of a product’s development life cycle and the results of using the Agile approach looking out for advantages and short comings as well, we proposed a PDCA inspired tool which embeds both quality and creativity techniques to help developers ensure quality for each stage of a product’s life cycle as well as help them better organize their activities to reach the desired goals. We validated this approach by implementing it to the case of the Vitraly startup.

  5. Protocol of measurement techniques - Project colored solar collectors

    Schueler, A.; Chambrier, E. De; Roecker, Ch.; Scartezzini, J.-L.

    2004-08-15

    This illustrated annual report for the Swiss Federal Office of Energy (SFOE) takes a look at work done at the Swiss Federal Institute of Technology in Lausanne, Switzerland, on multi-layer, thin-film interference coatings for solar collector glazing. The correct combinations of refractive indices and film thickness are discussed. The authors state that corresponding multi-layered thin film stacks will have to be realised experimentally in a controlled and reproducible way. New thin film materials are to be tailored to exhibit optimised optical and ageing properties. The development of these coatings is to be based on various measurement techniques, such as spectro-photometry, measurements of total power throughput by means of a solar simulator, spectroscopic ellipsometry, scanning electron microscopy (SEM), X-ray diffraction (XRD) and X-ray photoelectron spectroscopy (XPS). The paper provides many examples of typical data and explains which film properties can be inferred from each method and thus describes both the function and purpose of the different measurement techniques.

  6. CAVEAT: an assistance project for software validation using formal techniques

    Trotin, A.; Antoine, C.; Baudin, P.; Collart, J.M.; Raguideau, J.; Zylberajch, C.

    1995-01-01

    The aim of the CAVEAT project is to provide a tool for the validation of industrial C language softwares. It allows the user to go inside the program and have a good comprehension of it. It allows also the possibility to realize refined verifications of the consistency between the specifications and the program by translating the properties into a more suitable language. It calculates automatically the conditions to demonstrate, and offers an assistance to perform interactive demonstrations. The principal application of this tool is the safety of systems during the verification/certification phase or during the developing phase where it can works as an intelligent debugging system. (J.S.). 5 refs., 1 fig

  7. The EXPLODET project: advanced nuclear techniques for humanitarian demining

    Viesti, G.; Cinausero, M.; Cufaro-Petroni, N.; D'Erasmo, G.; Fabris, D.; Fioretto, E.; Fonte, R.; Lunardon, M.; Lazzizzera, I.; Nardelli, G.; Nardulli, G.; Nebbia, G.; Palomba, M.; Pantaleo, A.; Pappalardo, L.; Pesente, S.; Prati, P.; Prete, G.; Reito, S.; Sartori, A.; Tecchiolli, G.; Zavatarelli, S.; Filippini, V.

    1999-01-01

    Thermal neutron activation and fast neutron scattering are known to be a useful tool to detect hidden explosives which present an elevated concentration of nitrogen and peculiar elemental ratio for light elements (C, N, O). Such characteristics can be suitably optimized to detect the small amount of explosives contained in anti-personnel mines (APM) disseminated in former war theatres. We report here on a research program aimed at defining a conceptual design of a field operated system for APM detection based on neutron induced reactions

  8. NKA/KRU project on operator training, control room designing and human reliability. Summary report

    1981-06-01

    A Nordic integrated project on human reliability in the conditions of new advanced technology seeks to establish: - The actual repertoire of activities and tasks performed by the operating staff of a nuclear power plant and its dependence on the present and future levels of automation. - The knowledge required for these activities and appropriate means for training plant operators and for competence evaluation and retraining in coping with the rare events. - Models of human operator performance; how do operators read information and make decisions under normal and abnormal plant conditions and how does their performance depend upon control room design. - The typical limits of human capabilities and mechanisms of human errors as they are represented in existing records of incidents and accidents in industrial plants. - The use of process computers for improved design of data presentation and operator support systems, especially for disturbance analysis and diagnosis during infrequent plant disturbance. - Development of experimental techniques to validate research results and proposals for improved man/machine interfaces and other computer-based support systems. (EG)

  9. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  10. The appliction of project management in operations preparation of nuclear power station

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  11. The application of project management in operations preparation of nuclear power station

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  12. Advanced Hard Real-Time Operating System, The Maruti Project. Part 1.

    1997-01-01

    REAL - TIME OPERATING SYSTEM , THE MARUTI PROJECT Part 1 of 2 Ashok K. Agrawala Satish K. Tripathi Department of Computer Science University of Maryland...Hard Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s) 5c. Project # DRPB Ashok K. Agrawala...SdSA94), a real - time operating system developed at the I3nversity of Maryland, and conducted extensive experiments under various task

  13. Calcaneocuboid joint instability: a novel operative technique for anatomic reconstruction.

    Lohrer, Heinz; Arentz, Sabine

    2004-05-01

    A case history of a 13-year-old female national top-level gymnast, suffering from calcaneocuboid joint instability, is presented. The procedure was done as an anatomic repair by capsular reefing, which was augmented using a local periosteal flap. Initially, the athlete twisted her ankle. Clinical investigation revealed no sign of a lateral ankle ligament injury, but following this initial examination, recurrent giving-way of the foot occurred. She additionally felt significant but diffuse pain on the lateral side of the foot during loading in training and competition. For 2 months she was unable to run and conservative treatment failed. Diagnosis of a calcaneocuboid instability was established 4 months after the initial lesion by clinical and x-ray stress examination of the calcaneocuboid joint. Open surgery was successfully performed. Early functional posttreatment was done and the patient returned to full high-level gymnastics ability 16 weeks after surgery. Two years later, a similar injury occurred to the opposite calcaneocuboid joint and the same operative procedure again led to full sports ability.

  14. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  15. Operational experience of decommissioning techniques for research reactors in the United Kingdom

    England, M.R.; McCool, T.M.

    2002-01-01

    In previous co-ordinated research projects (CRP) conducted by the IAEA no distinction was made between decommissioning activities carried out at nuclear power plants, research reactors or nuclear fuel cycle facilities. As experience was gained and technology advanced it became clear that decommissioning of research reactors had certain specific characteristics which needed a dedicated approach. It was within this context that a CRP on Decommissioning Techniques for Research Reactors was launched and conducted by the IAEA from 1997 to 2001. This paper considers the experience gained from the decommissioning of two research reactors during the course of the CRP namely: (a) the ICI Triga Mk I reactor at Billingham UK which was largely complete by the end of the research project and (b) the Argonaut 100 reactor at the Scottish Universities Research and Reactor centre at East Kilbride in Scotland which is currently is the early stages of dismantling/site operations. It is the intention of this paper with reference to the two case studies outlined above to compare the actual implementation of these works against the original proposals and identify areas that were found to be problematical and/or identify any lessons learnt. (author)

  16. The projection operator in a Hilbert space and its directional derivative. Consequences for the theory of projected dynamical systems

    George Isac

    2004-01-01

    Full Text Available In the first part of this paper we present a representation theorem for the directional derivative of the metric projection operator in an arbitrary Hilbert space. As a consequence of the representation theorem, we present in the second part the development of the theory of projected dynamical systems in infinite dimensional Hilbert space. We show that this development is possible if we use the viable solutions of differential inclusions. We use also pseudomonotone operators.

  17. Operation technique and healing process of telescopic ileocolostomy in dogs.

    Szucs, G; Tóth, I; Barna, T; Bráth, E; Gyáni, K; Mikó, Irén

    2003-01-01

    large intestine does not suffer ischaemic or any other kind of damage. This inexpensive and simple anastomosis technique could be useful in the veterinary surgical practice as well.

  18. Characterization of Sensitive Species and Habitats Affected by the Operation of USACE Water Resource Development Projects

    Kasul, Richard

    2000-01-01

    ...) work unit titled "Reservoir Operations - Impacts on Target Species." Current knowledge regarding the occurrence of sensitive species that have been identified as a management concern in the operation of Corps projects is reviewed...

  19. Project 'Use of nuclear techniques in investigation, conservation and management of the cultural historical patrimony

    Kochmann, Sonnia

    2000-12-01

    This project is aimed at solving problems of conservation of the cultural historical patrimony through the active participation of the member countries of ARCAL by the application of Analytic Nuclear Techniques [es

  20. The Evocative Power of Projective Techniques for the Elicitation of Meaning

    Caroline Porr PhD

    2011-03-01

    Full Text Available A unique project was undertaken by doctoral and postdoctoral students, and their mentor, from diverse backgrounds in health and social sciences to explore their past experiences as participants in a qualitative research training initiative called EQUIPP (Enhancing Qualitative Understanding of Illness Processes and Prevention. The purpose of the project was to create a symbolic representation of the EQUIPP program through the use of projective techniques. The authors examined the meaning of engaging in qualitative research training through images and conceptual metaphors that were subsequently consolidated thematically and then portrayed in the form of a newly constructed logo that was developed with the assistance of a professional graphic designer. Projective techniques proved to be a powerful, evocative tool for eliciting meaning and translating concrete experiences into visual discourse. In this paper, the authors discuss how projective techniques were operationalized and consider their broad implications for qualitative research.

  1. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  2. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  3. EASYTRAC Project: Work package 6.4 Reversal technique to calibrate gear and thread standards

    Carmignato, Simone; De Chiffre, Leonardo; Larsen, Erik

    This report was produced as a part of the project EASYTRAC, an EU project under the programme Competitive and Sustainable Growth: Contract No. G6RD-CT-2000-00188, coordinated by UNIMETRIK S.A. (Spain). The project is concerned with low uncertainty calibrations on coordinate measuring machines (CM...... (PTB) - Germany and Tampere University of Technology (TUT) - Finland. The present report describes feasibility and experimental results of a reversal and substitute element technique application for thread calibration on CMMs....

  4. A novelty detection diagnostic methodology for gearboxes operating under fluctuating operating conditions using probabilistic techniques

    Schmidt, S.; Heyns, P. S.; de Villiers, J. P.

    2018-02-01

    In this paper, a fault diagnostic methodology is developed which is able to detect, locate and trend gear faults under fluctuating operating conditions when only vibration data from a single transducer, measured on a healthy gearbox are available. A two-phase feature extraction and modelling process is proposed to infer the operating condition and based on the operating condition, to detect changes in the machine condition. Information from optimised machine and operating condition hidden Markov models are statistically combined to generate a discrepancy signal which is post-processed to infer the condition of the gearbox. The discrepancy signal is processed and combined with statistical methods for automatic fault detection and localisation and to perform fault trending over time. The proposed methodology is validated on experimental data and a tacholess order tracking methodology is used to enhance the cost-effectiveness of the diagnostic methodology.

  5. Optimization of advanced plants operation: The Escrime project

    Fiche, C.; Papin, B.

    1994-01-01

    The Escrime program aims at defining the optimal share of tasks between humans and computers under normal or accidental plant operation. Basic principles we keep in mind are the following: human operators are likely to be necessary in the operation of future plants because we cannot demonstrate that plant design is error free, so unexpected situation can still happen; automation must not release the operators from their decisional role but only help them avoiding situations of cognitive overload which can lead to increase the risk of errors; the optimum share of tasks between human and automatic systems must be based on a critical analysis of the tasks and of the way they are handled. The last point appeared to be of major importance. The corresponding analysis of the French PWR's operating procedures enabled us to define a unified scheme for plant operation under the form of a hierarchy of goals and means. Beyond this analysis, development of a specific testing facility is under way to check the relevance of the proposed plant operation organization and to test the human-machine cooperation in different situations for various levels of automation. 7 refs, 4 figs

  6. Planning, starting, and operating an educational incentives project.

    Finnigan, O D; Sun, T H

    1972-01-01

    The article presents a summary of activities in an educational savings project in Taiwan. The project rewards couples who limit their family size. The reward is in the form of funds which enable the couples to send their children to secondary schools or universities. According to a 1970 survey in Taiwan the ideal number of children remained at 4. Consistent with traditional Chinese values, Taiwanese expect their children to take care of them in their old-age. They also place a strong emphasis on education and when surveyed 40% cited education costs as a reason for saving money. A rural township, Changua county, was selected for the pilot project. The project offers to couples with 0, 1, or 2 children an annual deposit in a savings account for each year that they do not exceed 2 living children. If a couple has a third child the value of the savings account is reduced by 50%. If they have a fourth child the account is cancelled and all funds are returned to the bank. In this particular study it was decided to include couples who already had 3 children. The account can be closed by a 1 time withdrawal from 10-14 years after enrollment. After 10 years it is worth US $267.50. After 14 years its value is US $384.60. 961 married women less than 30 years old with 3 or fewer children were contacted to join the project. Village leaders and administrators were invited to a meeting to gain their support before registration took place. After mailing and meetings, 727 or 69% of those eligible joined the project. By September 1973 the investigators hoped to be able to measure the effect of the program on family size ideals, number of additional children wanted, and practice of contraception. By September 1975 they hope to begin to measure the program effect on fertility.

  7. Designing an intranet from scratch to sketch: experiences from techniques used in the IDEnet project

    Berndtsson, Johan

    1999-01-01

    The choice of techniques to support system design is important in order to achieve a satisfactory result with regard to the quality of the future system. In the IDEnet development project, we chose to work with techniques used within, or inspired by, three different research areas: sociology...

  8. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  9. Spent nuclear fuel project cold vacuum drying facility operations manual

    IRWIN, J.J.

    1999-01-01

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  10. Concept of operations : Dallas Integrated Corridor Management (ICM) demonstration project.

    2010-06-01

    This concept of operations (Con Ops) for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US : Department of Transportation Integrated Corridor Management Initiative, which is an innovative research initiative ...

  11. Project CHECO Southeast Asia Report. LINEBACKER Operations, September - December 1972

    1978-12-31

    U) The first step toward a new point in emphasis began at CINCPAC on 29 September 1972, when the fifth Linebacker/ Pocket Money operations assessment...effectiveness during poor visibility, weather continued to limit operations during August and September. One Linebacker/ Pocket Money assessment stated that...Linebacker/ Pocket Money Assessment, 050339Z Oct 72 (hereinafter cited as CINCPAC, Pocket Money Assessment) (CMR TS-168, 45). 22. Msg (U), 7AF/DO to

  12. Coherent State Projection Operator Representation of Symplectic Transformations as a Loyal Representation of Symplectic Group

    Fan, Hong-Yi; Chen, Jun-Hua

    2002-08-01

    We find that the coherent state projection operator representation of symplectic transformation constitutes a loyal group representation of symplectic group. The result of successively applying squeezing operators on number state can be easily derived. The project supported by National Natural Science Foundation of China under Grant No. 10575057 and the President Foundation of the Chinese Academy of Sciences

  13. Operations Strategy Development in Project-based Production – a building contractor implements Lean

    Koch, Christian; Friis, Ole Uhrskov

    2015-01-01

    Purpose: To study how operations strategy innovation occurs in project-based production and organisation. Design/methodology/approach: A longitudinal case study encompassing the processes at the company headquarters and in two projects using Lean. Findings: The operations strategy development com...

  14. Differential operators admitting various rates of spectral projection growth

    Mityagin, B.; Siegl, Petr; Viola, J.

    2017-01-01

    Roč. 272, č. 8 (2017), s. 3129-3175 ISSN 0022-1236 Institutional support: RVO:61389005 Keywords : harmonic and anharmonic oscillators * Hennite functions * spectral projections * Riesz basis Subject RIV: BE - Theoretical Physics OBOR OECD: Pure mathematics Impact factor: 1.254, year: 2016

  15. In vivo evaluation of inter-operator reproducibility of digital dental and conventional impression techniques.

    Emi Kamimura

    Full Text Available The aim of this study was to evaluate and compare the inter-operator reproducibility of three-dimensional (3D images of teeth captured by a digital impression technique to a conventional impression technique in vivo.Twelve participants with complete natural dentition were included in this study. A digital impression of the mandibular molars of these participants was made by two operators with different levels of clinical experience, 3 or 16 years, using an intra-oral scanner (Lava COS, 3M ESPE. A silicone impression also was made by the same operators using the double mix impression technique (Imprint3, 3M ESPE. Stereolithography (STL data were directly exported from the Lava COS system, while STL data of a plaster model made from silicone impression were captured by a three-dimensional (3D laboratory scanner (D810, 3shape. The STL datasets recorded by two different operators were compared using 3D evaluation software and superimposed using the best-fit-algorithm method (least-squares method, PolyWorks, InnovMetric Software for each impression technique. Inter-operator reproducibility as evaluated by average discrepancies of corresponding 3D data was compared between the two techniques (Wilcoxon signed-rank test.The visual inspection of superimposed datasets revealed that discrepancies between repeated digital impression were smaller than observed with silicone impression. Confirmation was forthcoming from statistical analysis revealing significantly smaller average inter-operator reproducibility using a digital impression technique (0.014± 0.02 mm than when using a conventional impression technique (0.023 ± 0.01 mm.The results of this in vivo study suggest that inter-operator reproducibility with a digital impression technique may be better than that of a conventional impression technique and is independent of the clinical experience of the operator.

  16. In vivo evaluation of inter-operator reproducibility of digital dental and conventional impression techniques

    Kamimura, Emi; Tanaka, Shinpei; Takaba, Masayuki; Tachi, Keita; Baba, Kazuyoshi

    2017-01-01

    Purpose The aim of this study was to evaluate and compare the inter-operator reproducibility of three-dimensional (3D) images of teeth captured by a digital impression technique to a conventional impression technique in vivo. Materials and methods Twelve participants with complete natural dentition were included in this study. A digital impression of the mandibular molars of these participants was made by two operators with different levels of clinical experience, 3 or 16 years, using an intra-oral scanner (Lava COS, 3M ESPE). A silicone impression also was made by the same operators using the double mix impression technique (Imprint3, 3M ESPE). Stereolithography (STL) data were directly exported from the Lava COS system, while STL data of a plaster model made from silicone impression were captured by a three-dimensional (3D) laboratory scanner (D810, 3shape). The STL datasets recorded by two different operators were compared using 3D evaluation software and superimposed using the best-fit-algorithm method (least-squares method, PolyWorks, InnovMetric Software) for each impression technique. Inter-operator reproducibility as evaluated by average discrepancies of corresponding 3D data was compared between the two techniques (Wilcoxon signed-rank test). Results The visual inspection of superimposed datasets revealed that discrepancies between repeated digital impression were smaller than observed with silicone impression. Confirmation was forthcoming from statistical analysis revealing significantly smaller average inter-operator reproducibility using a digital impression technique (0.014± 0.02 mm) than when using a conventional impression technique (0.023 ± 0.01 mm). Conclusion The results of this in vivo study suggest that inter-operator reproducibility with a digital impression technique may be better than that of a conventional impression technique and is independent of the clinical experience of the operator. PMID:28636642

  17. A Novel Nipple Reconstruction Technique for Maintaining Nipple Projection: The Boomerang Flap.

    Kim, Young-Eun; Hong, Ki Yong; Minn, Kyung Won; Jin, Ung Sik

    2016-09-01

    Nipple-areolar complex (NAC) reconstruction is the final step in the long journey of breast reconstruction for mastectomy patients. Successful NAC reconstruction depends on the use of appropriate surgical techniques that are simple and reliable. To date, numerous techniques have been used for nipple reconstruction, including contralateral nipple sharing and various local flaps. Recently, it has been common to utilize local flaps. However, the most common nipple reconstruction problem encountered with local flaps is the loss of nipple projection; there can be approximately 50% projection loss in reconstructed nipples over long-term follow-up. Several factors might contribute to nipple projection loss, and we tried to overcome these factors by performing nipple reconstructions using a boomerang flap technique, which is a modified C-V flap that utilizes the previous mastectomy scar to maintain long-term nipple projection.

  18. A Novel Nipple Reconstruction Technique for Maintaining Nipple Projection: The Boomerang Flap

    Young-Eun Kim

    2016-09-01

    Full Text Available Nipple-areolar complex (NAC reconstruction is the final step in the long journey of breast reconstruction for mastectomy patients. Successful NAC reconstruction depends on the use of appropriate surgical techniques that are simple and reliable. To date, numerous techniques have been used for nipple reconstruction, including contralateral nipple sharing and various local flaps. Recently, it has been common to utilize local flaps. However, the most common nipple reconstruction problem encountered with local flaps is the loss of nipple projection; there can be approximately 50% projection loss in reconstructed nipples over long-term follow-up. Several factors might contribute to nipple projection loss, and we tried to overcome these factors by performing nipple reconstructions using a boomerang flap technique, which is a modified C–V flap that utilizes the previous mastectomy scar to maintain long-term nipple projection.

  19. The tree technique and irreducible tensor operators for the quantum algebra suq (2). The algebra of irreducible tensor operators

    Smirnov, Yu.F.; Tolstoi, V.N.; Kharitonov, Yu.I.

    1993-01-01

    The tree technique for the quantum algebra su q (2) developed in an earlier study is used to construct the q analog of the algebra of irreducible tensor operators. The adjoint action of the algebra su q (2) on irreducible tensor operators is discussed, and the adjoint R matrix is introduced. A set of expressions is obtained for the matrix elements of various irreducible tensor operators and combinations of them. As an application, the recursion relations for the Clebsch-Gordan and Racah coefficients of the algebra su q (2) are derived. 16 refs

  20. Execution techniques and approach for high level radioactive waste disposal in Japan: Demonstration of geological disposal techniques and implementation approach of HLW project

    Kawanishi, M.; Komada, H.; Kitayama, K.; Akasaka, H.; Tsuchi, H.

    2001-01-01

    In Japan, the high-level radioactive waste (HLW) disposal project is expected to start fully after establishment of the implementing organization, which is planned around the year 2000 and to dispose the wastes in the 2030s to at latest in the middle of 2040s. Considering each step in the implementation of the HLW disposal project in Japan, this paper discusses the execution procedure for HLW disposal project, such as the selection of candidate/planned disposal sites, the construction and operation of the disposal facility, the closure and decommissioning of facilities, and the institutional control and monitoring after the closure of disposal facility, from a technical viewpoint for the rational execution of the project. Furthermore, we investigate and propose some ideas for the concept of the design of geological disposal facility, the validation and demonstration of the reliability on the disposal techniques and performance assessment methods at a candidate/planned site. Based on these investigation results, we made clear a milestone for the execution of the HLW disposal project in Japan. (author)

  1. Projection-operator calculations of the lowest e(-)-He resonance

    Berk, A.; Bhatia, A. K.; Junker, B. R.; Temkin, A.

    1986-01-01

    The 1s (2s)2:2S Schulz resonance of He(-) is investigated theoretically, applying the full projection-operator formalism developed by Temkin and Bhatia (1985) in a Rayleigh-Ritz variational calculation. The technique is described in detail, and results for five different approximations of the He target state are presented in a table. Good convergence is obtained, but it is found that even the best calculated value of the resonance is about 130 meV higher than the experimentally measured value of 19.367 + or - 0.007 eV (Brunt et al., 1977), a discrepancy attributed to the contribution of the shift in the Feshbach formalism.

  2. Study on operation I and C DCS test method of EPR project

    Meng Ying; Lv Zhihong; Huang Xinnian; Fan Haiying; Li Zhuojia; Xiao Shushu

    2014-01-01

    Through summarization and optimization of the method for operation I and C DCS test of the European pressurized reactor project, the conclusions play a guiding role on the operation I and C DCS test of the domestic advanced nuclear power plant. The study of the method focuses on the test platform, the test process and the optimization of method of operation I and C DCS test with the practical experience. The reasonable and reliable test method for operation I and C DCS test of the European pressurized reactor project is worthy of the reference and the development in the project of the domestic advanced nuclear power plant. (authors)

  3. Technical contribution to the project and operation of pulsed columns

    Kromek, I.B.; Ikuta, A.

    1976-01-01

    Characteristics and factors that affect the performance of pulse columms used in the purification of metals as thorium, uranium and plutonium are described. The pulse generator and the control instrumentation of these columns are also described. This report is based mainly in the works made by Richardson and Platt and adaptations realized in the project and instalation of the first compound extraction-scrub pulse column in the CEQ/IEA (Sao Paulo, Brazil) [pt

  4. Nevada test site radionuclide inventory and distribution: project operations plan

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  5. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  6. Modified Sleeve Technique in Aortic Valve-Sparing Operation for Marfan Syndrome.

    Wu, Yung-Szu; Hsieh, Shih-Rong; Wang, Chung-Chi; Tsai, Chung-Lin

    2018-03-22

    We devised a simple modification of the Florida Sleeve procedure to perform aortic valve-sparing surgery. This technique is simple, quick, effective, and safe. We used this technique in operations performed on two young patients with Marfan syndrome. The initial and short-term results were satisfactory.

  7. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  8. Characterisation of dust material emitted during harbour operations (HADA Project)

    Moreno, N.; Alastuey, A.; Querol, X.; Artinano, B.; Guerra, A.; Luaces, J.A.; Lorente, A.; Basora, J. [CSIC, Institute of Earth Science ' Jaume Almera' , Barcelona (Spain)

    2007-09-15

    The aim of this work is to compile an inventory of the main characteristics (chemical, morphological, mineralogical and grain size parameters) of the bulk cargo materials and of the material emitted during different port operations for possible use as tracers of the fugitive PM emission sources. For all cases, the tracer characteristics determined for each bulk material were also identified in the corresponding PM material emitted. This inventory could assist the harbour authorities to identify the origin of high PM events recorded by air quality monitoring networks in harbour areas, and could also help modellers to predict the impact of harbour activities on ambient PM levels. The harbour of Tarragona (north-east Spain) was selected for this study given the high volume of solids in bulk handled. To this end, 12 handling operations of selected materials (clinker, phosphate, pyrite ash, Mn mineral, fine Si-Mn, coke (coal), bituminous coal, tapioca, soybean, alfalfa, corn, andalusite) were selected for the characterisation of suspended and deposited PM. In spite of the coarse grain size distribution of these bulk cargo materials, with a very low % in the fraction {lt}10 {mu}m, manipulation of these materials during harbour operations may result in high emissions of PM 10 with relatively high levels of potential toxic elements. Furthermore, ambient PM 10 in the area with the highest traffic density of the harbour was also sampled and characterised.

  9. Do Projects really end late? On the shortcomings of the classical scheduling techniques

    Pablo Ballesteros-Pérez

    2018-03-01

    Full Text Available Many engineering projects fail to meet their planned completion dates in real practice. This a recurrent topic in the project management literature, with poor planning and controlling practices frequently cited among the most significant causes of delays. Unfortunately, hardly any attention has been paid to the fact that the classical scheduling techniques: Gantt chart, Critical Path Method (CPM, and Program Evaluation and Review Technique (PERT, may not be as fit for purpose as they seem. Arguably, because of their relative simplicity, these techniques are still almost the only ones taught nowadays in most introductory courses to scheduling in many engineering and management degrees. However, by utterly ignoring or inappropriately dealing with activity duration variability, these techniques provide optimistic completion dates, while suffering from other shortcomings. Through a series of simple case studies that can be developed with a few participants and common dice, a systematic critique of the classical scheduling techniques is offered. Discussion of the case studies results illustrate why limiting the contents of scheduling education and teaching can be detrimental, as the aforementioned classical scheduling techniques cannot not provide project managers with sufficient resources to effectively plan and control real projects.

  10. Ventilation and filtration techniques for handling aerosols produced by thermal cutting operations

    Bishop, A.

    1989-01-01

    This report describes the work done to characterize aerosols from thermal cutting operations and to develop suitable ventilation and filtration techniques. The work has been carried out under a research contract between the Windscale Laboratory and the Commission of the European Communities. The contract started in October 1984 and was completed in June 1988. The total cost of the work was UKL 132 000 of which 50% was funded by the Commission. This report has been compiled from the several progress reports submitted during the work period and details the main findings from the work programme. By working with colleagues from Commissariat a l'energie atomique, Saclay, France, additional useful data were collected. The bimodal size distribution of aerosols from oxypropane cutting was confirmed. Trials on various prefilters showed that the electrostatic precipitator (ESP) and the cartridge filter had excellent collection properties. From these trials the ESP was selected as the prefilter for the windscale advanced gas-cooled reactor (WAGR) decommissioning project. This work is presented in Appendix 1 to this report. Details are given of the proposals to modify the ESP to enable the safe removal of radioactive dust and contamined collector plates. Tests are described on aerosols generated by laser cutting and also trials on the ESP and high gradient magnetic separation prefilters. Finally, the measurement of filter burdens, aerosol concentrations and dust deposition rates from thermal cutting in a full-size ventilation rig are reported

  11. Solution Procedure for Transport Modeling in Effluent Recharge Based on Operator-Splitting Techniques

    Shutang Zhu

    2008-01-01

    Full Text Available The coupling of groundwater movement and reactive transport during groundwater recharge with wastewater leads to a complicated mathematical model, involving terms to describe convection-dispersion, adsorption/desorption and/or biodegradation, and so forth. It has been found very difficult to solve such a coupled model either analytically or numerically. The present study adopts operator-splitting techniques to decompose the coupled model into two submodels with different intrinsic characteristics. By applying an upwind finite difference scheme to the finite volume integral of the convection flux term, an implicit solution procedure is derived to solve the convection-dominant equation. The dispersion term is discretized in a standard central-difference scheme while the dispersion-dominant equation is solved using either the preconditioned Jacobi conjugate gradient (PJCG method or Thomas method based on local-one-dimensional scheme. The solution method proposed in this study is applied to the demonstration project of groundwater recharge with secondary effluent at Gaobeidian sewage treatment plant (STP successfully.

  12. Mash-up of techniques between data crawling/transfer, data preservation/stewardship and data processing/visualization technologies on a science cloud system designed for Earth and space science: a report of successful operation and science projects of the NICT Science Cloud

    Murata, K. T.

    2014-12-01

    Data-intensive or data-centric science is 4th paradigm after observational and/or experimental science (1st paradigm), theoretical science (2nd paradigm) and numerical science (3rd paradigm). Science cloud is an infrastructure for 4th science methodology. The NICT science cloud is designed for big data sciences of Earth, space and other sciences based on modern informatics and information technologies [1]. Data flow on the cloud is through the following three techniques; (1) data crawling and transfer, (2) data preservation and stewardship, and (3) data processing and visualization. Original tools and applications of these techniques have been designed and implemented. We mash up these tools and applications on the NICT Science Cloud to build up customized systems for each project. In this paper, we discuss science data processing through these three steps. For big data science, data file deployment on a distributed storage system should be well designed in order to save storage cost and transfer time. We developed a high-bandwidth virtual remote storage system (HbVRS) and data crawling tool, NICTY/DLA and Wide-area Observation Network Monitoring (WONM) system, respectively. Data files are saved on the cloud storage system according to both data preservation policy and data processing plan. The storage system is developed via distributed file system middle-ware (Gfarm: GRID datafarm). It is effective since disaster recovery (DR) and parallel data processing are carried out simultaneously without moving these big data from storage to storage. Data files are managed on our Web application, WSDBank (World Science Data Bank). The big-data on the cloud are processed via Pwrake, which is a workflow tool with high-bandwidth of I/O. There are several visualization tools on the cloud; VirtualAurora for magnetosphere and ionosphere, VDVGE for google Earth, STICKER for urban environment data and STARStouch for multi-disciplinary data. There are 30 projects running on the NICT

  13. Stabilizing operation point technique based on the tunable distributed feedback laser for interferometric sensors

    Mao, Xuefeng; Zhou, Xinlei; Yu, Qingxu

    2016-02-01

    We describe a stabilizing operation point technique based on the tunable Distributed Feedback (DFB) laser for quadrature demodulation of interferometric sensors. By introducing automatic lock quadrature point and wavelength periodically tuning compensation into an interferometric system, the operation point of interferometric system is stabilized when the system suffers various environmental perturbations. To demonstrate the feasibility of this stabilizing operation point technique, experiments have been performed using a tunable-DFB-laser as light source to interrogate an extrinsic Fabry-Perot interferometric vibration sensor and a diaphragm-based acoustic sensor. Experimental results show that good tracing of Q-point was effectively realized.

  14. Treatment techniques for removing natural radionuclides from drinking water. Final report of the TENAWA project

    Annanmaeki, M.; Turtiainen, T.

    2000-01-01

    TENAWA project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water) was carried out on a cost-shared basic with the European Commission (CEC) under the supervision of Directorate-General XII, Radiation Protection Unit. TENAWA project was started because in several European countries ground water supplies may contain high amounts of natural radionuclides. During the project both laboratory and field research was performed in order to test the applicability of different equipment and techniques for removing natural radionuclides from drinking water. The measurable objectives of the project were: to give recommendations on the most suitable methods for removing radon ( 222 Rn), uranium ( 238,234 U), radium ( 226 , 228 Ra), lead ( 210 Pb) and polonium ( 210 Po) from drinking water of different qualities (i.e. soft, hard, iron-, manganese- and humus-rich, acidic) to test commercially available equipment for its ability to remove radionuclides; to find new materials, absorbents and membranes effective in the removal of radionuclides and to issue guidelines for the treatment and disposal of radioactive wastes produced in water treatment. Radon could be removed efficiently (>95%) from domestic water supplies by both aeration and granular activated carbon (GAC) filtration. Defects in technical reliability or radon removal efficiency were observed in some aerators. The significant drawback of GAC filtration was the elevated gamma dose rates (up to 120 μSv/h) near the filter and the radioactivity of spent GAC. Aeration was found to be a suitable method for removing radon at waterworks, too. The removal efficiencies at waterworks where the aeration process was designed to remove radon or carbon dioxide were 67-99%. If the aeration process was properly designed, removal efficiencies higher than 95% could be attained. Uranium could best be removed (>95%) with strong basic anion exchange resins and radium by applying strong acidic cation exchange resins

  15. Treatment techniques for removing natural radionuclides from drinking water. Final report of the TENAWA project

    Annanmaeki, M.; Turtiainen, T. [eds.

    2000-01-01

    TENAWA project (Treatment Techniques for Removing Natural Radionuclides from Drinking Water) was carried out on a cost-shared basic with the European Commission (CEC) under the supervision of Directorate-General XII, Radiation Protection Unit. TENAWA project was started because in several European countries ground water supplies may contain high amounts of natural radionuclides. During the project both laboratory and field research was performed in order to test the applicability of different equipment and techniques for removing natural radionuclides from drinking water. The measurable objectives of the project were: to give recommendations on the most suitable methods for removing radon ({sup 222}Rn), uranium ({sup 238,234}U), radium ({sup 226}, {sup 228}Ra), lead ({sup 210}Pb) and polonium ({sup 210}Po) from drinking water of different qualities (i.e. soft, hard, iron-, manganese- and humus-rich, acidic) to test commercially available equipment for its ability to remove radionuclides; to find new materials, absorbents and membranes effective in the removal of radionuclides and to issue guidelines for the treatment and disposal of radioactive wastes produced in water treatment. Radon could be removed efficiently (>95%) from domestic water supplies by both aeration and granular activated carbon (GAC) filtration. Defects in technical reliability or radon removal efficiency were observed in some aerators. The significant drawback of GAC filtration was the elevated gamma dose rates (up to 120 {mu}Sv/h) near the filter and the radioactivity of spent GAC. Aeration was found to be a suitable method for removing radon at waterworks, too. The removal efficiencies at waterworks where the aeration process was designed to remove radon or carbon dioxide were 67-99%. If the aeration process was properly designed, removal efficiencies higher than 95% could be attained. Uranium could best be removed (>95%) with strong basic anion exchange resins and radium by applying strong

  16. Variances in the projections, resulting from CLIMEX, Boosted Regression Trees and Random Forests techniques

    Shabani, Farzin; Kumar, Lalit; Solhjouy-fard, Samaneh

    2017-08-01

    The aim of this study was to have a comparative investigation and evaluation of the capabilities of correlative and mechanistic modeling processes, applied to the projection of future distributions of date palm in novel environments and to establish a method of minimizing uncertainty in the projections of differing techniques. The location of this study on a global scale is in Middle Eastern Countries. We compared the mechanistic model CLIMEX (CL) with the correlative models MaxEnt (MX), Boosted Regression Trees (BRT), and Random Forests (RF) to project current and future distributions of date palm ( Phoenix dactylifera L.). The Global Climate Model (GCM), the CSIRO-Mk3.0 (CS) using the A2 emissions scenario, was selected for making projections. Both indigenous and alien distribution data of the species were utilized in the modeling process. The common areas predicted by MX, BRT, RF, and CL from the CS GCM were extracted and compared to ascertain projection uncertainty levels of each individual technique. The common areas identified by all four modeling techniques were used to produce a map indicating suitable and unsuitable areas for date palm cultivation for Middle Eastern countries, for the present and the year 2100. The four different modeling approaches predict fairly different distributions. Projections from CL were more conservative than from MX. The BRT and RF were the most conservative methods in terms of projections for the current time. The combination of the final CL and MX projections for the present and 2100 provide higher certainty concerning those areas that will become highly suitable for future date palm cultivation. According to the four models, cold, hot, and wet stress, with differences on a regional basis, appears to be the major restrictions on future date palm distribution. The results demonstrate variances in the projections, resulting from different techniques. The assessment and interpretation of model projections requires reservations

  17. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  18. A Dynamic Operation Permission Technique Based on an MFM Model and Numerical Simulation

    Akio, Gofuku; Masahiro, Yonemura

    2011-01-01

    It is important to support operator activities to an abnormal plant situation where many counter actions are taken in relatively short time. The authors proposed a technique called dynamic operation permission to decrease human errors without eliminating creative idea of operators to cope with an abnormal plant situation by checking if the counter action taken is consistent with emergency operation procedure. If the counter action is inconsistent, a dynamic operation permission system warns it to operators. It also explains how and why the counter action is inconsistent and what influence will appear on the future plant behavior by a qualitative influence inference technique based on a model by the Mf (Multilevel Flow Modeling). However, the previous dynamic operation permission is not able to explain quantitative effects on plant future behavior. Moreover, many possible influence paths are derived because a qualitative reasoning does not give a solution when positive and negative influences are propagated to the same node. This study extends the dynamic operation permission by combining the qualitative reasoning and the numerical simulation technique. The qualitative reasoning based on an Mf model of plant derives all possible influence propagation paths. Then, a numerical simulation gives a prediction of plant future behavior in the case of taking a counter action. The influence propagation that does not coincide with the simulation results is excluded from possible influence paths. The extended technique is implemented in a dynamic operation permission system for an oil refinery plant. An MFM model and a static numerical simulator are developed. The results of dynamic operation permission for some abnormal plant situations show the improvement of the accuracy of dynamic operation permission and the quality of explanation for the effects of the counter action taken

  19. Selecting the Most Economic Project under Uncertainty Using Bootstrap Technique and Fuzzy Simulation

    Kamran Shahanaghi

    2012-01-01

    Full Text Available This article, by leaving pre-determined membership function of a fuzzy set which is a basic assumption for such subject, will try to propose a hybrid technique to select the most economic project among alternative projects in fuzziness interest rates condition. In this way, net present worth (NPW would be the economic indicator. This article tries to challenge the assumption of large sample sizes availability for membership function determination and shows that some other techniques may have less accuracy. To give a robust solution, bootstrapping and fuzzy simulation is suggested and a numerical example is given and analyzed.

  20. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  1. Advanced Hard Real-Time Operating System, the Maruti Project. Part 2.

    1997-01-01

    Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s...The maruti hard real - time " operating system . A CM SIGOPS, Operating Systems Review. 23:90-106, July 1989. 254 !1 110) C. L. Liu and J. Layland...February 14, 1995 Abstract The Maruti Real - Time Operating System was developed for applications that must meet hard real-time constraints. In order

  2. Spaceflight Systems Training: A Comparison and Contrasting of Techniques for Training Ground Operators and Onboard Crewmembers

    Balmain, Clinton; Fleming, Mark

    2009-01-01

    When developing techniques and products for instruction on manned spaceflight systems, training organizations are often faced with two very different customers: ground operators and onboard crewmembers. Frequently, instructional development focuses on one of these customers with the assumption that the other s needs will be met by default. Experience teaches us that differing approaches are required when developing training tailored to the specific needs of each customer. As a rule, ground operators require focused instruction on specific areas of expertise. Their knowledge should be of the details of the hardware, software, and operational techniques associated with that system. They often benefit from historical knowledge of how their system has operated over its lifetime. Since several different ground operators may be interfacing with the same system, each individual operator must understand the agreed-to principles by which that system will be run. In contrast, onboard crewmembers require a more broad, hands-on awareness of their operational environment. Their training should be developed with an understanding of the physical environment in which they live and work and the day-to-day tasks they are most likely to perform. Rarely do they require a deep understanding of the details of a system; it is often sufficient to teach them just enough to maintain situational awareness and perform basic tasks associated with maintenance and operation of onboard systems. Crewmembers may also develop unique onboard operational techniques that differ from preceding crews. They should be taught what flexibility they have in systems operations and how their specific habits can be communicated to ground support personnel. This paper will explore the techniques that can be employed when developing training for these unique customers. We will explore the history of International Space Station training development and how past efforts can guide us in creating training for users of

  3. Operation and maintenance techniques of pool and pool water purification system in IMEF

    Soong, Woong Sup

    1999-03-01

    IMEF pool is used pass way between pool and hot cell in order to inlet and outlet of fuel pin in cask. All operation is performed conforming with naked eyes. Therefore floating matter is filtered so as to easy under water handling. Also radioactivity in pool water is controlled according to the nuclear law, radioactivity ration maintained less than 15mR/hr on pool side. Perfect operation and maintenance can be achieved well trained operator. Result obtained from the perfection can give more influence over restrain, spreading contamination of radioactivity materials. This report describes operation and maintenance technique of pool water purification system in IMEF. (Author). 7 refs., 13 figs.

  4. Operation and maintenance techniques of pool and pool water purification system in IMEF

    Soong, Woong Sup

    1999-03-01

    IMEF pool is used pass way between pool and hot cell in order to inlet and outlet of fuel pin in cask. All operation is performed conforming with naked eyes. Therefore floating matter is filtered so as to easy under water handling. Also radioactivity in pool water is controlled according to the nuclear law, radioactivity ration maintained less than 15mR/hr on pool side. Perfect operation and maintenance can be achieved well trained operator. Result obtained from the perfection can give more influence over restrain, spreading contamination of radioactivity materials. This report describes operation and maintenance technique of pool water purification system in IMEF. (Author). 7 refs., 13 figs

  5. FY 1998 New Sunshine Project. International co-operative project (Summary); 1998 nendo new sunshine keikaku. Kokusai kyoryoku jigyo (sogoban)

    NONE

    1999-03-01

    Described herein are the basic plans for the international co-operative projects for development of technologies for commercialization of photovoltaic power systems (e.g., IEA co-operative programme on Photovoltaic Power Systems), and the minutes of the FY 1997 and 1998 meetings of the Solar Energy Technology International Research Co-operative Committee. Japan is responsible for implementing the following projects for promoting international cooperation for, e.g., IEA Photovoltaic Power Systems (PVPS): research and development, demonstration, analysis, information exchange, introduction promotion, etc. for IEA/PVPS Programme; and research and development, demonstration, analysis, information exchange, introduction promotion, etc. for IEA/Solar Heating and Cooling Programme. Japan is also implementing the co-operative projects for the photovoltaic power systems with the Summit participants, based on Science and Technology Working Group established by the Versailles Summit, technology cooperation with, e.g., Australia, and bilateral information exchange and technological survey projects with those countries which have already developed solar energy systems, e.g., USA, France, Spain and Italy. (NEDO)

  6. Enhancing breast projection in autologous reconstruction using the St Andrew's coning technique and 3D volumetric analysis.

    Chae, Michael P; Rozen, Warren Matthew; Patel, Nakul Gamanlal; Hunter-Smith, David J; Ramakrishnan, Venkat

    2017-12-01

    An increasing number of women undergo mastectomy for breast cancer and post-mastectomy autologous breast reconstruction has been shown to significantly improve the psychosexual wellbeing of the patients. A goal of treatment is to achieve symmetry and projection to match the native breast, and/or the contralateral breast in the case of a unilateral reconstruction. Autologous reconstruction, particularly with the deep inferior epigastric artery perforator (DIEP) flap, is particularly advantageous as it can be manipulated to mimic the shape and turgor of the native breast. However, very few techniques of shaping the breast conus when insetting the DIEP flap to enhance aesthetic outcome have been reported to date. With the aide of three-dimension (3D) photography and 3D-printed mirrored image of the contralateral breast as a guide intraoperatively, we describe our St Andrew's coning technique to create a personalized flap projection. We report a prospective case series of 3 delayed unilateral breast reconstructions where symmetrization procedure to the contralateral breast was not indicated. Using a commercial 3D scanner (VECTRA XR, Canfield Scientific), the breast region was imaged. The mirrored image was 3D-printed in-house using a desktop 3D printer. In all cases, projection of the breast mound was able to be safely achieved, with a demonstrated central volume (or 'cone') able to be highlighted on imaging and a 3D printed breast. A 3D print of the contralateral breast was able to be used intraoperatively to guide the operative approach. The St Andrew's coning technique is a useful aesthetic maneuver for achieving breast projection during DIEP flap breast reconstruction, with 3D imaging techniques able to assist in perioperative assessment of breast volume.

  7. Activities of research-reactor-technology project in FNCA from FY2005 to FY2007. Sharing neutronics calculation technique for core management and utilization of research reactors

    2010-07-01

    RRT project (Research-Reactor-Technology Project) was carried out with the theme of 'sharing neutronics calculation technique for core management and utilization of research reactors' in the framework of FNCA (Forum for Nuclear Cooperation in Asia) from FY2005 to FY2007. The objective of the project was to improve and equalize the level of neutronics calculation technique for the reactor core management among participating countries to assure the safe and stable operation of research reactors and the promotion of the effective utilization. Neutronics calculation codes, namely SRAC code system and MVP code, were adopted as common codes. Participating countries succeeded in applying the common codes to analyzing the core of each domestic research reactor. Some participating countries succeeded in applying the common codes to analyzing for utilization of own research reactors. Activities of RRT project have improved and equalized the level of neutronics calculation technique among participating countries. (author)

  8. RISK MANAGEMENT IN THE OPERATING ACTIVITIES OF AN ENTERPRISE AND IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

    Lech Jędrzejewski

    2017-03-01

    Full Text Available The paper is devoted to issues related to building a risk management system for businesses in the areas of operations and implementation of infrastructure projects. The article defines the concept of risk in business processes and identifies risks occurring in infrastructure projects. In the text, the principles have been presented for protection against the effects of political, contracting, environmental, ecological, product, process, operational and personnel risk.

  9. Case Writing Projects in Co-Operation with Companies and Organizations

    Bengtsson, Lars; Asplund, Carl-Johan

    2008-01-01

    The purpose of this paper is to present the process and evaluation of case writing projects in co-operation with companies and organizations in a course for engineering students. The case writing projects could provide an illustration and example framework for working with companies in constructing cases. Normally cases are constructed for teaching purposes in higher education. However, in order to get closer co-operation and more interest from the companies the authors encouraged the student...

  10. Investigation of sediment transport and optimization of dredging operations in Indian ports using radiotracer technique

    Pant, H.J.

    2012-01-01

    India has a long coastline of about 7,515 km and there are twelve major ports situated on the coastline. Out of them, six are situated on the West Coast whereas other six are situated on the East Coast. In addition to this, there are more than 140 minor ports and other marine establishments situated along the coastline. Each port and marine project has a navigation channel and depth of this navigation channel needs to be maintained to a level of at least 12-15 meters for smooth sailing of ships. Sediments continuously move along the coast due to alongshore currents generated by the waves and tides; and get deposited in navigation channels. For maintaining the required depth of the channels, the dredging operation is carried out. throughout the year or as and when required. Development of a new port or harbour also involves huge capital dredging. The dredged sediments generated during maintenance or capital dredging needs to be dumped at a suitable location, so that it does not find its way back to the channel and obstruct sailing of ships. Moreover the selected site should be such that the turn around time of the dredger is kept minimum to economize the dredging operation. In order to meet the above requirements, the knowledge of transport parameters such as the general direction of movement, extent of lateral and longitudinal movement, transport velocity, transport thickness and bed load movement rate is required. Radiotracer techniques are commonly used to investigate sediment transport on seabed and evaluate the suitability of the proposed dumping sites. Scandium-46 (half-life: 84 days, Gamma energies: 0.89 MeV (100%), 1.12 MeV (100%)) in the form of scandium glass powder is the most suitable radiotracer for tracing sediments on seabed. The activity used in an investigation ranges from 75-300 GBq (2-8 Ci). The suitably prepared particulate radiotracer is injected on seabed at the proposed site using a specially designed injection system and its movement is

  11. The technique of the modified hamiltonian for construction of the spin-projected wave function

    Tsaune, A.Ya.; Glushkov, V.N.

    1991-01-01

    A method is suggested to construct the wave function, which is an eigenfunction for operator S 2 . A combination of Lowdin's projection operators and the method of taking into account the orthogonality conditions in variational problems previously developed by the authors is used for determination of the spin-current wave functions component. It is shown that the suggested method gives better results for the energies that the traditional restricted Hartee-Fock scheme

  12. Budgeting for International Projects: In-Country Business Operations and Long-Term Residential Assignments.

    Richey, John B.

    1994-01-01

    A discussion of international sponsored research program administration looks at budgeting, costs, and procedures for both projects with in-country business operations in developing nations and projects with long-term residential assignments. It is intended for university administrators providing new services to faculty working on international…

  13. Financing Build, Operate and Transfer (BOT) Projects: The Case of Islamic Instruments

    Khan, Tariqullah

    2002-01-01

    Several member countries of the Islamic Development Bank have embarked upon a program of developing and maintaining infrastructure projects by the private sector in the framework of build operate and transfer (BOT) mechanism and its various variants. The present paper reviews these experiences and the peculiar risks associated with investments in these projects as compared to the risks of traditional manufacturing sector and offers a framework for Islamic instruments to finance BOT projects.

  14. The application of post-project reviews in events management by cultural operators

    Benadict Rajasegaram, Annet

    2016-01-01

    Organisations have evidently shifted towards the projectification of their activities and operations across the world and across industries by which project management is not only limited to construction and engineering projects anymore. The projectification has shed light on the amount of project success and failure in which both have been noted to have a steep difference between each other. Whilst many factors have been discovered to be a trigger of failure or success one emerging subject t...

  15. Project orie:nta.teci pla.:n:ni:ng, scheduling a.:nci controlling technique

    Review Technique. By October 1958 it ... (CPM) to schedule and control a very large project. and during the ... objectives are identified and the total job is broken down into ..... jobs in a single shop or shops in the plant, to scheduf- ing plants ...

  16. Introduction to in situ leaching technique and facility at Smith Ranch uranium project in USA

    Xu Lechang; Wang Delin; Sun Xianrong; Gao Shangxiong

    2005-01-01

    The history of in situ leaching of uranium in USA is reviewed. Some techniques and parameters of alkaline in situ leach at Smith Ranch uranium project are introduced, including well field, sorption, elution, precipitation, filter and drying, automatic control, radiation protection, safety and environmental protection. (authors)

  17. Interest and limitations of projective techniques in the assessment of personality disorders.

    Petot, J M

    2000-06-01

    Assessing personality disorders (PD) remains a difficult task because of persistent problems linked to concurrent validity of existing instruments, which are all structured interviews or self-report inventories. It has been advocated that indirect methods, projective techniques in particular, can strengthen PD assessment methods. The thematic apperception test (TAT) may be a significant adjuvant method of PD assessment.

  18. The Status of Projective Techniques: Or, "Wishing Won't Make It Go Away."

    Piotrowski, Chris

    The predicted decline in usefulness and emphasis of projective techniques was analyzed from several different perspectives including the academic community, members of the American Psychological Association (APA) Division 12, internship centers, the applied clinical setting, and private practitioners. In addition, an extensive review of empirical,…

  19. Adaptive digital fringe projection technique for high dynamic range three-dimensional shape measurement.

    Lin, Hui; Gao, Jian; Mei, Qing; He, Yunbo; Liu, Junxiu; Wang, Xingjin

    2016-04-04

    It is a challenge for any optical method to measure objects with a large range of reflectivity variation across the surface. Image saturation results in incorrect intensities in captured fringe pattern images, leading to phase and measurement errors. This paper presents a new adaptive digital fringe projection technique which avoids image saturation and has a high signal to noise ratio (SNR) in the three-dimensional (3-D) shape measurement of objects that has a large range of reflectivity variation across the surface. Compared to previous high dynamic range 3-D scan methods using many exposures and fringe pattern projections, which consumes a lot of time, the proposed technique uses only two preliminary steps of fringe pattern projection and image capture to generate the adapted fringe patterns, by adaptively adjusting the pixel-wise intensity of the projected fringe patterns based on the saturated pixels in the captured images of the surface being measured. For the bright regions due to high surface reflectivity and high illumination by the ambient light and surfaces interreflections, the projected intensity is reduced just to be low enough to avoid image saturation. Simultaneously, the maximum intensity of 255 is used for those dark regions with low surface reflectivity to maintain high SNR. Our experiments demonstrate that the proposed technique can achieve higher 3-D measurement accuracy across a surface with a large range of reflectivity variation.

  20. Use of structured personality survey techniques to indicate operator response to stressful situations

    Waller, M.A.

    1990-01-01

    Under given circumstances, a person will tend to operate in one of four dominant orientations: (1) to perform tasks; (2) to achieve consensus; (3) to achieve understanding, or (4) to maintain structure. Historically, personality survey techniques, such as the Myers-Briggs type indicator, have been used to determine these tendencies. While these techniques can accurately reflect a person's orientation under normal social situations, under different sets of conditions, the same person may exhibit other tendencies, displaying a similar or entirely different orientation. While most do not exhibit extreme tendencies or changes of orientation, the shift in personality from normal to stressful conditions can be rather dramatic, depending on the individual. Structured personality survey techniques have been used to indicate operator response to stressful situations. These techniques have been extended to indicate the balance between orientations that the control room team has through the various levels of cognizance

  1. Importance of projections, magnifications, and roentgen techniques in the evaluation of obstructions

    Sones, F.M. Jr.

    1982-01-01

    The authors describe their own technique for coronary angiography, using equipment which facilitates making exposures in craniocaudal or caudo-cranial projections in varying degrees of right or left obliquity up to 60 degrees. Each diagnostic problem must be approached on an individual basis but the usual procedure is two injections into the right coronary artery made in appropriate right and left anterior oblique projections, and four or five injections into the left coronary artery made in appropriate right and left anterior oblique projections. Decisions regarding the conduct of each study must be based on the angiographer's ability to observe and interpret the results of each injection with a properly designed television chain which presents exactly the same image as that being recorded by the cine camera. The problem of differentiating between organic obstruction and functional spasm is discussed and the magnification technique is described. (Auth./C.F.)

  2. On-line diagnostic techniques for air-operated control valves based on time series analysis

    Ito, Kenji; Matsuoka, Yoshinori; Minamikawa, Shigeru; Komatsu, Yasuki; Satoh, Takeshi.

    1996-01-01

    The objective of this research is to study the feasibility of applying on-line diagnostic techniques based on time series analysis to air-operated control valves - numerous valves of the type which are used in PWR plants. Generally the techniques can detect anomalies by failures in the initial stages for which detection is difficult by conventional surveillance of process parameters measured directly. However, the effectiveness of these techniques depends on the system being diagnosed. The difficulties in applying diagnostic techniques to air-operated control valves seem to come from the reduced sensitivity of their response as compared with hydraulic control systems, as well as the need to identify anomalies in low level signals that fluctuate only slightly but continuously. In this research, simulation tests were performed by setting various kinds of failure modes for a test valve with the same specifications as of a valve actually used in the plants. Actual control signals recorded from an operating plant were then used as input signals for simulation. The results of the tests confirmed the feasibility of applying on-line diagnostic techniques based on time series analysis to air-operated control valves. (author)

  3. Application of Arma Technique For Operation Stability of RSG-Gas

    Djudjuratisbela, Udju

    2000-01-01

    Application Of Arma Technique For Operation Stability Of RSG-Gas. Application of Fast Fourier Transport (FFT) method in the noise experiments data had been conducted to reactor kinetic parameter determination of RSG-Gas. Reactor stability that has closed relation to operation safety has not been measured yet. Noise analysis method and ARMA (Auto Regressive Moving Average) technique that has capability to identify mathematical model of the noise experimental data can be used for determination of kinetic/dynamic characteristic equation and its roots. From the roots of reactor characteristic equation, magnitude of natural frequency (fn), damping ratio (xi), damping frequency (fd), decay ratio (delta) and then reactor stability can be calculated

  4. Foil cycling technique for the VESUVIO spectrometer operating in the resonance detector configuration

    Schooneveld, E. M.; Mayers, J.; Rhodes, N. J.; Pietropaolo, A.; Andreani, C.; Senesi, R.; Gorini, G.; Perelli-Cippo, E.; Tardocchi, M.

    2006-01-01

    This article reports a novel experimental technique, namely, the foil cycling technique, developed on the VESUVIO spectrometer (ISIS spallation source) operating in the resonance detector configuration. It is shown that with a proper use of two foils of the same neutron absorbing material it is possible, in a double energy analysis process, to narrow the width of the instrumental resolution of a spectrometer operating in the resonance detector configuration and to achieve an effective subtraction of the neutron and gamma backgrounds. Preliminary experimental results, obtained from deep inelastic neutron scattering measurements on lead, zirconium hydride, and deuterium chloride samples, are presented

  5. Foil cycling technique for the VESUVIO spectrometer operating in the resonance detector configuration

    Schooneveld, E. M.; Mayers, J.; Rhodes, N. J.; Pietropaolo, A.; Andreani, C.; Senesi, R.; Gorini, G.; Perelli-Cippo, E.; Tardocchi, M.

    2006-09-01

    This article reports a novel experimental technique, namely, the foil cycling technique, developed on the VESUVIO spectrometer (ISIS spallation source) operating in the resonance detector configuration. It is shown that with a proper use of two foils of the same neutron absorbing material it is possible, in a double energy analysis process, to narrow the width of the instrumental resolution of a spectrometer operating in the resonance detector configuration and to achieve an effective subtraction of the neutron and gamma backgrounds. Preliminary experimental results, obtained from deep inelastic neutron scattering measurements on lead, zirconium hydride, and deuterium chloride samples, are presented.

  6. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  7. Project GRETE: evaluation of non destructive testing techniques for monitoring of material degradation

    Coste, J.F.

    2001-01-01

    The material aging of major critical components of nuclear installations due to in-service conditions may lead to a degradation of their mechanical characteristics. The early detection of material changes and their monitoring using innovative non destructive testing techniques would allow to plan actions in order to prevent the apparition of macroscopic damage (e.g. cracks). One major difficulty in using these particular techniques is to correlate the changes in the measured NDT signals to the microstructural changes in the material due to aging. This problem may be solved through careful microstructural examinations of the material damage. The objective of the project GRETE is to illustrate the potential use of NDT techniques for the monitoring of material degradation through two examples: neutron irradiation of reactor pressure vessel steel and thermal fatigue of piping. The purpose of this paper is to present the project and its programme of work. (author)

  8. Method and apparatus for optimizing operation of a power generating plant using artificial intelligence techniques

    Wroblewski, David [Mentor, OH; Katrompas, Alexander M [Concord, OH; Parikh, Neel J [Richmond Heights, OH

    2009-09-01

    A method and apparatus for optimizing the operation of a power generating plant using artificial intelligence techniques. One or more decisions D are determined for at least one consecutive time increment, where at least one of the decisions D is associated with a discrete variable for the operation of a power plant device in the power generating plant. In an illustrated embodiment, the power plant device is a soot cleaning device associated with a boiler.

  9. Project configured supply networks: Governance of delivery and failures in operations

    Koch, Christian

    2008-01-01

    of delivery types; parts, components and subsystems. The project configuration and orchestrated governance forms are not always successful, and failures emerge. The paper aims at studying governance forms in delivery networks using operational failures as litmus. Operation management approaches is used...... failures occurred during three month observation. The costs were 8 pct. of the production budget. None of the mobilised governance forms fully prevented failures, especially subsystem delivery and internal integration was underperforming.......  Supply networks in complex B2B- construction deliver knowledge, materials, components, subsystems, competences, workforce and management. The delivery network and its governance forms are partly permanent, partly project specific. Integration upstream varies by project, constituting a range...

  10. Projection operators and supplementary conditions for superfields with an arbitrary spin

    Sokatchev, E.

    1975-01-01

    It is shown that a superfield with an external spin j and a nonzero mass contains four non reducible representations of supersymmetry algebra. A general method is proposed for the evolution the representations out of the superfield by using projection operators, derived from Casimir operators. This expansion is also expressed in terms of additional differential conditions

  11. Small Explorer project: Submillimeter Wave Astronomy Satellite (SWAS). Mission operations and data analysis plan

    Melnick, Gary J.

    1990-01-01

    The Mission Operations and Data Analysis Plan is presented for the Submillimeter Wave Astronomy Satellite (SWAS) Project. It defines organizational responsibilities, discusses target selection and navigation, specifies instrument command and data requirements, defines data reduction and analysis hardware and software requirements, and discusses mission operations center staffing requirements.

  12. Latvian experience of 'Regional Project on Quality Control and Quality Assurance for Nuclear Analytical Techniques' (RER/2/004)

    Skujina, Anita

    2002-01-01

    This report outlined the Latvian Radiation Safety Centre experience gained from the participation in the project. The accomplishments of the project are presented and the main difficulties are identified. In the course of the project 16 operating procedures and 17 instructions have been developed and the laboratory operations have been set in accordance with the ISO 17025 requirements

  13. Regional technical cooperation model project, IAEA - RER/2/2004 ''quality control and quality assurance for nuclear analytical techniques'

    Arikan, P.

    2002-01-01

    An analytical laboratory should produce high quality analytical data through the use of analytical measurements that is accurate, reliable and adequate for the intended purpose. This objective can be accomplished in a cost-effective manner under a planned and documented quality system of activities. It is well-known that serious deficiencies can occur in laboratory operations when insufficient attention is given to the quality of the work. It requires not only a thorough knowledge of the laboratory's purpose and operation, but also the dedication of the management and operating staff to standards of excellence. Laboratories employing nuclear and nuclear-related analytical techniques are sometimes confronted with performance problems which prevent them from becoming accepted and respected by clients, such as industry, government and regulatory bodies, and from being eligible for contracts. The International Standard ISO 17025 has been produced as the result of extensive experience in the implementation of ISO/IEC Guide 25:1990 and EN 45001:1989, which replaces both of them now. It contains all of the requirements that testing and calibration laboratories must meet if they wish to demonstrate that they operate a quality system that is technically competent, and are able to generate technically valid results. The use of ISO 17025 should facilitate cooperation between laboratories and other bodies to assist in the exchange of information and experience, and in the harmonization of standards and procedures. IAEA model project RER/2/004 entitled 'Quality Assurance/Quality Control in Nuclear Analytical Techniques' was initiated in 1999 as a Regional TC project in East European countries to assist Member State laboratories in the region to install a complete quality system according to the ISO/IEC 17025 standard. 12 laboratories from 11 countries plus the Agency's Laboratories in Seibersdorf have been selected as participants to undergo exercises and training with the

  14. How should grid operators govern smart grid innovation projects? An embedded case study approach

    Reuver, Mark de; Lei, Telli van der; Lukszo, Zofia

    2016-01-01

    Grid operators increasingly have to collaborate with other actors in order to realize smart grid innovations. For routine maintenance, grid operators typically acquire technologies in one-off transactions, but the innovative nature of smart grid projects may require more collaborate relationships. This paper studies how a transactional versus relational approach to governing smart grid innovation projects affects incentives for other actors to collaborate. We analyse 34 cases of smart grid innovation projects based on extensive archival data as well as interviews. We find that projects relying on relational governance are more likely to provide incentives for collaboration. Especially non-financial incentives such as reputational benefits and shared intellectual property rights are more likely to be found in projects relying on relational governance. Policy makers that wish to stimulate smart grid innovation projects should consider stimulating long-term relationships between grid operators and third parties, because such relationships are more likely to produce incentives for collaboration. - Highlights: • Smart grids require collaboration between grid operators and other actors. • We contrast transactional and relational governance of smart grid projects. • Long-term relations produce more incentives for smart grid collaboration. • Non-financial incentives are more important in long-term relations. • Policy makers should stimulate long-term relations to stimulate smart grids.

  15. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  16. Development and comparison of projection and image space 3D nodule insertion techniques

    Robins, Marthony; Solomon, Justin; Sahbaee, Pooyan; Samei, Ehsan

    2016-04-01

    This study aimed to develop and compare two methods of inserting computerized virtual lesions into CT datasets. 24 physical (synthetic) nodules of three sizes and four morphologies were inserted into an anthropomorphic chest phantom (LUNGMAN, KYOTO KAGAKU). The phantom was scanned (Somatom Definition Flash, Siemens Healthcare) with and without nodules present, and images were reconstructed with filtered back projection and iterative reconstruction (SAFIRE) at 0.6 mm slice thickness using a standard thoracic CT protocol at multiple dose settings. Virtual 3D CAD models based on the physical nodules were virtually inserted (accounting for the system MTF) into the nodule-free CT data using two techniques. These techniques include projection-based and image-based insertion. Nodule volumes were estimated using a commercial segmentation tool (iNtuition, TeraRecon, Inc.). Differences were tested using paired t-tests and R2 goodness of fit between the virtually and physically inserted nodules. Both insertion techniques resulted in nodule volumes very similar to the real nodules (values were all <0.97 for both insertion techniques. These data imply that these techniques can confidently be used as a means of inserting virtual nodules in CT datasets. These techniques can be instrumental in building hybrid CT datasets composed of patient images with virtually inserted nodules.

  17. Optimizing charge breeding techniques for ISOL facilities in Europe: Conclusions from the EMILIE project

    Delahaye, P., E-mail: delahaye@ganil.fr; Jardin, P.; Maunoury, L. [GANIL, CEA/DSM-CNRS/IN2P3, Blvd. Becquerel, BP 55027, 14076 Caen Cedex 05 (France); Galatà, A.; Patti, G. [INFN–Laboratori Nazionali di Legnaro, Viale dell’Università 2, 35020 Legnaro (Padova) (Italy); Angot, J.; Lamy, T.; Thuillier, T. [LPSC–Université Grenoble Alpes–CNRS/IN2P3, 53 rue des Martyrs, 38026 Grenoble Cedex (France); Cam, J. F.; Traykov, E.; Ban, G. [LPC Caen, 6 Blvd. Maréchal Juin, 14050 Caen Cedex (France); Celona, L. [INFN–Laboratori Nazionali del Sud, via S. Sofia 62, 95125 Catania (Italy); Choinski, J.; Gmaj, P. [Heavy Ion Laboratory, University of Warsaw, ul. Pasteura 5a, 02 093 Warsaw (Poland); Koivisto, H.; Kolhinen, V.; Tarvainen, O. [Department of Physics, University of Jyväskylä, PB 35 (YFL), 40351 Jyväskylä (Finland); Vondrasek, R. [Argonne National Laboratory, 9700 S. Cass Avenue, Argonne, Illinois 60439 (United States); Wenander, F. [ISOLDE, CERN, 1211 Geneva 23 (Switzerland)

    2016-02-15

    The present paper summarizes the results obtained from the past few years in the framework of the Enhanced Multi-Ionization of short-Lived Isotopes for Eurisol (EMILIE) project. The EMILIE project aims at improving the charge breeding techniques with both Electron Cyclotron Resonance Ion Sources (ECRIS) and Electron Beam Ion Sources (EBISs) for European Radioactive Ion Beam (RIB) facilities. Within EMILIE, an original technique for debunching the beam from EBIS charge breeders is being developed, for making an optimal use of the capabilities of CW post-accelerators of the future facilities. Such a debunching technique should eventually resolve duty cycle and time structure issues which presently complicate the data-acquisition of experiments. The results of the first tests of this technique are reported here. In comparison with charge breeding with an EBIS, the ECRIS technique had lower performance in efficiency and attainable charge state for metallic ion beams and also suffered from issues related to beam contamination. In recent years, improvements have been made which significantly reduce the differences between the two techniques, making ECRIS charge breeding more attractive especially for CW machines producing intense beams. Upgraded versions of the Phoenix charge breeder, originally developed by LPSC, will be used at SPES and GANIL/SPIRAL. These two charge breeders have benefited from studies undertaken within EMILIE, which are also briefly summarized here.

  18. High-speed technique based on a parallel projection correlation procedure for digital image correlation

    Zaripov, D. I.; Renfu, Li

    2018-05-01

    The implementation of high-efficiency digital image correlation methods based on a zero-normalized cross-correlation (ZNCC) procedure for high-speed, time-resolved measurements using a high-resolution digital camera is associated with big data processing and is often time consuming. In order to speed-up ZNCC computation, a high-speed technique based on a parallel projection correlation procedure is proposed. The proposed technique involves the use of interrogation window projections instead of its two-dimensional field of luminous intensity. This simplification allows acceleration of ZNCC computation up to 28.8 times compared to ZNCC calculated directly, depending on the size of interrogation window and region of interest. The results of three synthetic test cases, such as a one-dimensional uniform flow, a linear shear flow and a turbulent boundary-layer flow, are discussed in terms of accuracy. In the latter case, the proposed technique is implemented together with an iterative window-deformation technique. On the basis of the results of the present work, the proposed technique is recommended to be used for initial velocity field calculation, with further correction using more accurate techniques.

  19. Final Project Report: Imaging Fault Zones Using a Novel Elastic Reverse-Time Migration Imaging Technique

    Huang, Lianjie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Chen, Ting [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Tan, Sirui [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Lin, Youzuo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Gao, Kai [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-10

    Imaging fault zones and fractures is crucial for geothermal operators, providing important information for reservoir evaluation and management strategies. However, there are no existing techniques available for directly and clearly imaging fault zones, particularly for steeply dipping faults and fracture zones. In this project, we developed novel acoustic- and elastic-waveform inversion methods for high-resolution velocity model building. In addition, we developed acoustic and elastic reverse-time migration methods for high-resolution subsurface imaging of complex subsurface structures and steeply-dipping fault/fracture zones. We first evaluated and verified the improved capabilities of our newly developed seismic inversion and migration imaging methods using synthetic seismic data. Our numerical tests verified that our new methods directly image subsurface fracture/fault zones using surface seismic reflection data. We then applied our novel seismic inversion and migration imaging methods to a field 3D surface seismic dataset acquired at the Soda Lake geothermal field using Vibroseis sources. Our migration images of the Soda Lake geothermal field obtained using our seismic inversion and migration imaging algorithms revealed several possible fault/fracture zones. AltaRock Energy, Inc. is working with Cyrq Energy, Inc. to refine the geologic interpretation at the Soda Lake geothermal field. Trenton Cladouhos, Senior Vice President R&D of AltaRock, was very interested in our imaging results of 3D surface seismic data from the Soda Lake geothermal field. He planed to perform detailed interpretation of our images in collaboration with James Faulds and Holly McLachlan of University of Nevada at Reno. Using our high-resolution seismic inversion and migration imaging results can help determine the optimal locations to drill wells for geothermal energy production and reduce the risk of geothermal exploration.

  20. A team leadership approach to managing the transition from construction to operations for an environmental project

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  1. CONFLICTS AND OPERATIONAL HURDLES IN THE MANAGEMENT OF INNOVATIVE PROJECTS: AN EMPIRICAL STUDY

    José Varela Donato

    2013-12-01

    Full Text Available This article aims at describing how conflicts and operational hurdles manifest themselves in the management of innovative projects in a development bank (DB. The research characterizes itself as a qualitative and exploratory approach; the data collection consisted of interviews with consultants and project managers and by documents on management projects in Development Bank; the interviews have undergone the content analysis by utilizing the Atlas.ti. The research revealed that the project management in its new implemented model faces difficulties similar to those observed in traditional hierarchies. It was observed that conflicts regarding interests, values, psychological aspects and operational hurdles are intrinsic to the life cycle of innovative projects, which implementation requires a lot of political capacity from their leaders to be effective.

  2. Cost effective solutions for field development. System supplier approach to projects and operations

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  3. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  4. Development of a volumetric projection technique for the digital evaluation of field of view.

    Marshall, Russell; Summerskill, Stephen; Cook, Sharon

    2013-01-01

    Current regulations for field of view requirements in road vehicles are defined by 2D areas projected on the ground plane. This paper discusses the development of a new software-based volumetric field of view projection tool and its implementation within an existing digital human modelling system. In addition, the exploitation of this new tool is highlighted through its use in a UK Department for Transport funded research project exploring the current concerns with driver vision. Focusing specifically on rearwards visibility in small and medium passenger vehicles, the volumetric approach is shown to provide a number of distinct advantages. The ability to explore multiple projections of both direct vision (through windows) and indirect vision (through mirrors) provides a greater understanding of the field of view environment afforded to the driver whilst still maintaining compatibility with the 2D projections of the regulatory standards. Field of view requirements for drivers of road vehicles are defined by simplified 2D areas projected onto the ground plane. However, driver vision is a complex 3D problem. This paper presents the development of a new software-based 3D volumetric projection technique and its implementation in the evaluation of driver vision in small- and medium-sized passenger vehicles.

  5. Modern Project: monitoring developments for safe repository operation and staged closure

    Mayer, S.; Ouchhi, S.; Verstricht, J.; Maurer, H.; Breen, B.

    2010-01-01

    Document available in extended abstract form only. In a first part, the overall objectives of the MoDeRn project (Monitoring Developments for safe Repository operation and stage closure project) are presented. MoDeRn is a four year (2009-2013) collaborative project co-funded under the 7. Framework Program for Nuclear Research and Training (EURATOM). It involves 17 organizations responsible for research into radioactive waste management in the European Union, United States, Japan and Switzerland, with partners with extensive experience in monitoring activities in underground research laboratories (URL); as well as research institutes and universities with substantial experience in research on socio-technical interactions and public and stakeholder engagement. An overview of the project work packages and of their interdependencies is given. The successful implementation of a repository program for radioactive waste relies on both the technical aspects of a sound safety strategy and scientific and engineering excellence as well as on social aspects such as stakeholder acceptance and confidence. Monitoring is considered key in serving both technical and social objectives. It is not only essential to underpin the technical safety strategy and quality of the engineering, but it can also be an important tool for public communication, contributing to public understanding of and confidence in the repository behaviour. By inclusion of specific national contexts of waste management programs in different countries, the MoDeRn project aims at providing a reference framework for development and implementation of monitoring activities. This will be achieved by stakeholder engagement during all identifiable phases of the radioactive waste disposal process. Thus, site characterisation, construction, operation and staged closure, as well as post-closure institutional control phases have to be addressed. MoDeRn considers different host rock types, such as salt, tuff, crystalline rock

  6. How Digital Autoradiography Technique can be useful for D and D projects?

    Fichet, Pascal; Haudebourg, Raphael

    2016-01-01

    For many stakeholders, it is obvious that radiological characterization is essential for D and D projects and all of them have its own specificities. Different types of techniques have been developed for characterizations not only by destructive methods but also by in situ investigations. Since 2010, the LASE laboratory, in charge of characterizations of different radionuclides that can be found in nuclear wastes, has developed the Digital Autoradiography (DA) technique. Today, DA technique is in routine use commercially for biological researches to obtain images of labelled molecules containing for example H-3, C-14, I-129,... i.e. radionuclides difficult to measure for D and D projects. The needs to investigate these hard to observe radionuclides are one of the R and D subjects for D and D proposed recently and highlighted by OECD. Up to now the R and D projects concerning Digital Autoradiography has been focused on mapping process in buildings under dismantling process and also on sampling procedures being essential before any destructive analysis. New developments are still going on to develop the technique and to modify technologies coming from biological researches. (authors)

  7. A survey on the task analysis methods and techniques for nuclear power plant operators

    Lee, Yong Heui; Chun, Se Woo; Suh, Sang Moon; Lee, Jung Woon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-04-01

    We have surveyed techniques and methods of task analysis from very traditional ones to recently developed ones that are being applicated to various industrial fields. We compare each other and analyse their fundamental characteristics and methodological specification in order to find a proper one enough to apply to nuclear power plant operators tasks. Generally, the fundamental process of task analyses has well been understandable, but its process of application in practice has not been so simple due to the wide and varying range of applications according to specific domain. Operators` tasks in NPPs are supposed to be performed strictly according to operational procedures written in a text and well trained, so the method of task analysis for operators` tasks in NPPs can be established to have its unique characteristics of task analysis based on the operational procedures. 8 figs., 10 tabs., 18 refs. (Author).

  8. A survey on the task analysis methods and techniques for nuclear power plant operators

    Lee, Yong Heui; Chun, Se Woo; Suh, Sang Moon; Lee, Jung Woon

    1994-04-01

    We have surveyed techniques and methods of task analysis from very traditional ones to recently developed ones that are being applicated to various industrial fields. We compare each other and analyse their fundamental characteristics and methodological specification in order to find a proper one enough to apply to nuclear power plant operators tasks. Generally, the fundamental process of task analyses has well been understandable, but its process of application in practice has not been so simple due to the wide and varying range of applications according to specific domain. Operators' tasks in NPPs are supposed to be performed strictly according to operational procedures written in a text and well trained, so the method of task analysis for operators' tasks in NPPs can be established to have its unique characteristics of task analysis based on the operational procedures. 8 figs., 10 tabs., 18 refs. (Author)

  9. Reservoir adaptive operating rules based on both of historical streamflow and future projections

    Zhang, Wei; Liu, Pan; Wang, Hao; Chen, Jie; Lei, Xiaohui; Feng, Maoyuan

    2017-10-01

    Climate change is affecting hydrological variables and consequently is impacting water resources management. Historical strategies are no longer applicable under climate change. Therefore, adaptive management, especially adaptive operating rules for reservoirs, has been developed to mitigate the possible adverse effects of climate change. However, to date, adaptive operating rules are generally based on future projections involving uncertainties under climate change, yet ignoring historical information. To address this, we propose an approach for deriving adaptive operating rules considering both historical information and future projections, namely historical and future operating rules (HAFOR). A robustness index was developed by comparing benefits from HAFOR with benefits from conventional operating rules (COR). For both historical and future streamflow series, maximizations of both average benefits and the robustness index were employed as objectives, and four trade-offs were implemented to solve the multi-objective problem. Based on the integrated objective, the simulation-based optimization method was used to optimize the parameters of HAFOR. Using the Dongwushi Reservoir in China as a case study, HAFOR was demonstrated to be an effective and robust method for developing adaptive operating rules under the uncertain changing environment. Compared with historical or projected future operating rules (HOR or FPOR), HAFOR can reduce the uncertainty and increase the robustness for future projections, especially regarding results of reservoir releases and volumes. HAFOR, therefore, facilitates adaptive management in the context that climate change is difficult to predict accurately.

  10. The impact of applying product-modelling techniques in configurator projects

    Hvam, Lars; Kristjansdottir, Katrin; Shafiee, Sara

    2018-01-01

    This paper aims to increase understanding of the impact of using product-modelling techniques to structure and formalise knowledge in configurator projects. Companies that provide customised products increasingly apply configurators in support of sales and design activities, reaping benefits...... that include shorter lead times, improved quality of specifications and products, and lower overall product costs. The design and implementation of configurators are a challenging task that calls for scientifically based modelling techniques to support the formal representation of configurator knowledge. Even...... the phenomenon model and information model are considered visually, (2) non-UML-based modelling techniques, in which only the phenomenon model is considered and (3) non-formal modelling techniques. This study analyses the impact to companies from increased availability of product knowledge and improved control...

  11. Service design: a review of methods and techniques inthe point of view of service operations management area

    Noel Torres Júnior

    2013-11-01

    Full Text Available As in many developing countries, the service sector in Brazil is responsible for generating income and employment for a significant portion of the population. Due to this economic relevance, service organizations are faced with an increasingly demanding and competitive market. This demand greater innovation and business planning. Despite this, the process of service development remains a relatively unexplored subject in the literature. Several issues regarding the planning and management remain without clear ideas or propositions that guide their appropriate treatment. The result of this situation, the methods and techniques that help design the services are not properly disseminated. These are scattered through the literature of operations management services. Given this framework, the light of a review of the literature and concerning the elements that compose the service project according to the works of Machuca, Zamora-Gonzalez and Aguilar-Escobar (2007 and Edvardsson (1997, the present work points and examine the methods and techniques suggested by many authors and works on the area of Service Operations. It was found that the knowledge about the methods and techniques is diffuse. This knowledge is concentrated on the design process and determining the location of services.

  12. Operational techniques employed for the liquid sodium source term control loops

    Chulos, L.E.

    1976-01-01

    Four Source Term Control Loops (STCLs) have been designed, constructed, and placed into operation at the Hanford Engineering Development Laboratory (HEDL) as part of the Radioactivity Control Technology program. The data obtained are used to determine the corrosion and deposition of LMFBR materials, including corrosion product radionuclides, in a non-isothermal flowing sodium system. The paper discusses operation of the STCL Facilities and, in particular, the methods used for controlling the oxygen content of the liquid sodium. These methods include cold trapping techniques, hot trapping, seeding the cold traps with sodium oxide, and precipitating the oxygen in the cold trap in a controlled manner. Operational problems encountered with the STCL Facilities and the techniques for correcting these problems are also discussed

  13. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  14. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    Mehrasa, Majid; Pouresmaeil, Edris; Mehrjerdi, Hasan; Jørgensen, Bo Nørregaard; Catalão, João P.S.

    2015-01-01

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  15. Augmented reality-guided neurosurgery: accuracy and intraoperative application of an image projection technique.

    Besharati Tabrizi, Leila; Mahvash, Mehran

    2015-07-01

    An augmented reality system has been developed for image-guided neurosurgery to project images with regions of interest onto the patient's head, skull, or brain surface in real time. The aim of this study was to evaluate system accuracy and to perform the first intraoperative application. Images of segmented brain tumors in different localizations and sizes were created in 10 cases and were projected to a head phantom using a video projector. Registration was performed using 5 fiducial markers. After each registration, the distance of the 5 fiducial markers from the visualized tumor borders was measured on the virtual image and on the phantom. The difference was considered a projection error. Moreover, the image projection technique was intraoperatively applied in 5 patients and was compared with a standard navigation system. Augmented reality visualization of the tumors succeeded in all cases. The mean time for registration was 3.8 minutes (range 2-7 minutes). The mean projection error was 0.8 ± 0.25 mm. There were no significant differences in accuracy according to the localization and size of the tumor. Clinical feasibility and reliability of the augmented reality system could be proved intraoperatively in 5 patients (projection error 1.2 ± 0.54 mm). The augmented reality system is accurate and reliable for the intraoperative projection of images to the head, skull, and brain surface. The ergonomic advantage of this technique improves the planning of neurosurgical procedures and enables the surgeon to use direct visualization for image-guided neurosurgery.

  16. Managing your engineering consultants: Steps for simultaneously improving operations, project implementation, and your bottom line

    Kirchen, E.R.; Perilloux, B.L.

    1997-01-01

    The domestic oil and gas industry has responded to depleting reserves and increasing operating costs by downsizing the overhead required to maintain production and processing facilities. For many companies this downsizing has resulted in a reduced in-house engineering staff and a greater reliance on consulting engineering services. To get the most benefit from consulting engineering companies, the partnership between consultants and the oil and gas company needs to be carefully considered. Unfortunately, these partnerships are often developed at the home office with visionary goals in mind, only to be implemented reluctantly on a local level. A better strategy is to implement partnering tools on the local level and allow these partnerships to develop naturally, and at times, uniquely, at each location. The following such tools detailed in this paper are: manpower leveraging -- using field-trained consulting engineers to address project design/implementation and field/construction support so that the operating company's engineers may focus on management and detailed development of high-return projects; enhanced project scope and design review -- developing and reviewing project scope(s) and preliminary engineering designs to minimize engineering/construction costs as well as optimize the operability and constructability of the project; and consulting rate standardization -- understanding and structuring the consultant's rates so that neither side is exploited and so that the project is staffed in the interest of project execution and not maximum profits for the consultant

  17. Crew resource management: using aviation techniques to improve operating room safety.

    Ricci, Michael A; Brumsted, John R

    2012-04-01

    Since the publication of the Institute of Medicine report estimating nearly 100,000 deaths per year from medical errors, hospitals and physicians have a renewed focus upon error reduction. We implemented a surgical crew resource management (CRM) program for all operating room (OR) personnel. In our academic medical center, 19,000 procedures per year are performed in 27 operating rooms. Mandatory CRM training was implemented for all peri-operative personnel. Aviation techniques introduced included a pre-operative checklist and brief, post-operative debrief, read and initial files, and various other aviation-based techniques. Compliance with conduct of the brief/debrief was monitored as well as wrong-site surgeries and retained foreign body events. The malpractice insurance database for claims was also queried for the period prior to and after training. Initial training was accomplished for 517 people, including all anesthesiologists, surgeons, nurses, technicians, and OR assistants. Pre-operative briefing increased from 6.7 to 99% within 4 mo. Wrong site surgeries and retained foreign bodies decreased from a high of seven in 2007 to none in 2008, but, after 14 mo without additional training, these rose to five in 2009. Malpractice expenses (payouts and legal fees) totaled $793,000 (2003-2007), but have been zero since 2008. CRM training and implementation had an impact on reducing the incidence of wrong site surgery and retained foreign bodies in our operating rooms. However, constant reinforcement and refresher training is necessary for sustained results. Though no one technique can prevent all errors, CRM can effect culture change, producing a safer environment.

  18. A technique for the geometric modeling of underground surfaces: Nevada Nuclear Waste Storage Investigations Project

    Williams, R.L.

    1988-03-01

    There is a need within the Nevada Nuclear Waste Storage Investigation (NNWSI) project to develop three-dimensional surface definitions for the subterranean stratigraphies at Yucca Mountain, Nevada. The nature of the data samples available to the project require an interpolation technique that can perform well with sparse and irregularly spaced data. Following an evaluation of the relevant existing methods, a new technique, Multi-Kernel Modulation (MKM), is presented. MKM interpolates sparse and irregularly spaced data by modulating a polynomial trend surface with a linear summation of regular surfaces (kernels). A perspective discussion of MKM, Kriging, and Multiquadric Analysis reveals that MKM has the advantage of simplicity and efficiency when used with sparse samples. An example of the use of MKM to model a complex topography is presented. 24 refs., 6 figs., 2 tabs

  19. Robust breathing signal extraction from cone beam CT projections based on adaptive and global optimization techniques

    Chao, Ming; Yuan, Yading; Rosenzweig, Kenneth E; Lo, Yeh-Chi; Wei, Jie; Li, Tianfang

    2016-01-01

    We present a study of extracting respiratory signals from cone beam computed tomography (CBCT) projections within the framework of the Amsterdam Shroud (AS) technique. Acquired prior to the radiotherapy treatment, CBCT projections were preprocessed for contrast enhancement by converting the original intensity images to attenuation images with which the AS image was created. An adaptive robust z-normalization filtering was applied to further augment the weak oscillating structures locally. From the enhanced AS image, the respiratory signal was extracted using a two-step optimization approach to effectively reveal the large-scale regularity of the breathing signals. CBCT projection images from five patients acquired with the Varian Onboard Imager on the Clinac iX System Linear Accelerator (Varian Medical Systems, Palo Alto, CA) were employed to assess the proposed technique. Stable breathing signals can be reliably extracted using the proposed algorithm. Reference waveforms obtained using an air bellows belt (Philips Medical Systems, Cleveland, OH) were exported and compared to those with the AS based signals. The average errors for the enrolled patients between the estimated breath per minute (bpm) and the reference waveform bpm can be as low as  −0.07 with the standard deviation 1.58. The new algorithm outperformed the original AS technique for all patients by 8.5% to 30%. The impact of gantry rotation on the breathing signal was assessed with data acquired with a Quasar phantom (Modus Medical Devices Inc., London, Canada) and found to be minimal on the signal frequency. The new technique developed in this work will provide a practical solution to rendering markerless breathing signal using the CBCT projections for thoracic and abdominal patients. (paper)

  20. MR cholangiopancreatography: prospective comparison of a breath-hold 2D projection technique with diagnostic ERCP

    Lomas, D.J.; Bearcroft, P.W.P.; Gimson, A.E.

    1999-01-01

    The aim of this study was to compare prospectively a breath-hold projection magnetic resonance cholangiopancreatography (MRCP) technique with diagnostic endoscopic retrograde cholangiopancreatography (ERCP). Seventy-six patients with suspected strictures or choledocholithiasis were referred for MRCP and subsequent ERCP examination, which were performed within 4 h of each other. The MRCP technique was performed using fat-suppressed rapid acquisition with relaxation enhancement (RARE) projection images obtained in standardised planes with additional targeted projections as required by the supervising radiologist. Two radiologists (in consensus) assessed the MRCP results prospectively and independently for the presence of bile duct calculi, strictures, non-specific biliary dilatation and pancreatic duct dilatation, and recorded a single primary diagnosis. The ERCP was assessed prospectively and independently by a single endoscopist and used as a gold standard for comparison with MRCP. Diagnostic agreement was assessed by the Kappa statistic. The MRCP technique failed in two patients and ERCP in five. In the remaining 69 referrals ERCP demonstrated normal findings in 23 cases, strictures in 19 cases, choledocholithiasis in 9 cases, non-specific biliary dilatation in 14 cases and chronic pancreatitis in 4 cases. The MRCP technique correctly demonstrated 22 of 23 normal cases, 19 strictures with one false positive (sensitivity 100 %, specificity 98 %), all 9 cases of choledocholithiasis with two false positives (sensitivity 100 %, specificity 97 %), 12 of 14 cases of non-specific biliary dilatation and only 1 of 4 cases of chronic pancreatitis. There was overall good agreement for diagnosis based on a kappa value of 0.88. Breath-hold projection MRCP can provide non-invasively comparable diagnostic information to diagnostic ERCP for suspected choledocholithiasis and biliary strictures and may allow more selective use of therapeutic ERCP. (orig.)

  1. Computer literacy enhancement in the Teaching Hospital Olomouc. Part I: project management techniques. Short communication.

    Sedlár, Drahomír; Potomková, Jarmila; Rehorová, Jarmila; Seckár, Pavel; Sukopová, Vera

    2003-11-01

    Information explosion and globalization make great demands on keeping pace with the new trends in the healthcare sector. The contemporary level of computer and information literacy among most health care professionals in the Teaching Hospital Olomouc (Czech Republic) is not satisfactory for efficient exploitation of modern information technology in diagnostics, therapy and nursing. The present contribution describes the application of two basic problem solving techniques (brainstorming, SWOT analysis) to develop a project aimed at information literacy enhancement.

  2. Assessing the effect of different operation techniques on postoperative duplex ultrasound quality after carotid endarterectomy.

    Grambow, E; Heller, T; Wieneke, P; Weiß, C; Klar, E; Weinrich, M

    2018-01-01

    Duplex ultrasound is the first choice in diagnostics and surveillance of stenoses of the internal carotid arteries before and even after surgery. Therefore, the quality of duplex ultrasound is crucial to investigate these vascular pathologies. Aim of this study was the evaluation whether different surgical techniques affect the postoperative quality of duplex ultrasound. In a time period from January to May 2015 duplex ultrasound of the cervical vessels was performed in 75 patients after unilateral endarterectomy of the internal carotid artery at our department between 2006 and 2012. Thereby, the non-operated contralateral side served as a control. Study groups were defined by the surgical techniques of eversion- or thrombendarterectomy with patch plasty using different patch materials and/or a haemostatic sealant. Duplex ultrasound analysis included acoustic impedance, extinction of ultrasound, thickness of skin and individual anatomic aspects of the patients. Carotid endarterectomy itself reduced intravascular grey levels, skin thickness and increased extinction of duplex ultrasound when compared to the non-operated side of the neck. In contrast, neither the kind of chosen operative technique nor the use of different patch materials or the application of a haemostatic sealant showed an effect in this regards. Whereas carotid endarterectomy per se worsens the quality of postoperative duplex ultrasound, the different analysed surgical techniques as well as used patches and the application of a haemostatic sealant can be assumed to be equal regarding the quality of postoperative ultrasound.

  3. The Model of Lake Operation in Water Transfer Projects Based on the Theory of Water- right

    Bi-peng, Yan; Chao, Liu; Fang-ping, Tang

    the lake operation is a very important content in Water Transfer Projects. The previous studies have not any related to water-right and water- price previous. In this paper, water right is divided into three parts, one is initialization waterright, another is by investment, and the third is government's water- right re-distribution. The water-right distribution model is also build. After analyzing the cost in water transfer project, a model and computation method for the capacity price as well as quantity price is proposed. The model of lake operation in water transfer projects base on the theory of water- right is also build. The simulation regulation for the lake was carried out by using historical data and Genetic Algorithms. Water supply and impoundment control line of the lake was proposed. The result can be used by south to north water transfer projects.

  4. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  5. Techniques for incorporating operator expertise into intelligent decision aids and training

    Blackman, H.S.; Nelson, W.R.

    1987-01-01

    The objective of this work is to evaluate the potential for developing a complete model for training novices based upon a combination of rules for operation, and heuristics for application of the rules. The method used to investigate this potential is based upon the experimental evaluation of the response tree expert system. The present study used the low pressure injection system (LPIS) simulation developed for the response tree expert system evaluation, so that the rules of operation were already developed, and only the expert heuristics needed to be identified. The heuristics were abstracted from concurrent and recall protocols, taken from expert operators while attempting to solve transients on the LPIS, using protocol analysis techniques previously developed. This paper describes the experiment, and identifies the mental processes used by expert operators

  6. Low-cost engineering techniques in sustainable operation of a rural clean water plant in thailand

    Pengchai, P.; Keawkhun, K.; Suwapaet, N.

    2012-01-01

    Problems of water supply in many rural regions of Thailand result from the lack of awareness and financial limitations. Payanghang Clean Water Plant is an example of the rural water plant that has been suffering from the poor operation since 2003. The objective of this study was to modify the operation processes of this water plant to achieve cleaner water and better financial condition. Low-cost engineering techniques, such as the use of floating switches in filtration ponds, the use of water drip system for alum dosing and the addition of Tamarindus indica Linn seed solution was applied. As a result, 76% of turbidity removal efficiency was derived. Although, the difference was not statistically significant at 95% confidence level, higher removal efficiency in comparison with the one before modification (65%) suggested better operation. In the view of financial aspect, l07 dollars (1 baht = 0.0326 U.S. dollar) benefit was obtained from 7 month-operation period. (author)

  7. Approach to Issues in Planning and Operation of Railway BOT Projects

    Zhao Xianghong; Chen Min

    2009-01-01

    As an internationally popular mode of public infrastructures' investment,construction and operation,BOT (build-operate-transfer) has been successfully applied in some countries and regions of the world for their infrastructures' construction and playing an important role in promoting the construction of public infrastructures.The Ministry of Railways clearly proposed in its Suggestions for Implementation of Encouraging,Supporting and Guiding Participation of Non-public-owned Economy in Railway Construction and Operation that it was necessary to study and take for reference multiple modes of public infrastructures'investment,construction and operation including BOT.It is more complicated and risky for the process of planning and operation of BOT projects.The paper takes for reference the domestic and foreign experiences in the operation of BOT projects,analyzes the issues that will arise such as risk control in implementing railway BOT projects,employment of professional consultants,financing coordination,tariff making,non-commercial subsidy,as well as operation and management,and puts forward corresponding suggestions for these issues.

  8. Conceptual design report for tank farm restoration and safe operations, project W-314

    Briggs, S.R., Westinghouse Hanford

    1996-05-02

    This Conceptual Design Report (CDR) presents the conceptual level design approach that satisfies the established technical requirements for Project W-314, `Tank Farm Restoration and Safe Operations.` The CDR also addresses the initial cost and schedule baselines for performing the proposed Tank Farm infrastructure upgrades. The scope of this project includes capital improvements to Hanford`s existing tank farm facilities(primarily focused on Double- Shell Tank Farms) in the areas of instrumentation/control, tank ventilation, waste transfer, and electrical systems.

  9. Project W-320, operational test procedure OTP-320-003 test report

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  10. MONDO Project: real time ocean monitoring through Lagrangian drifters during offshore drilling operations

    Mafra, Tatiana [Eni Oil do Brasil, Rio de Janeiro, RJ (Brazil); Fragoso, Mauricio da Rocha; Santos, Francisco Alves dos; Cruz, Leonardo M. Marques A.; Pellegrini, Julio A.C.; Cerrone, Bruna Nogueira [Prooceano, Rio de Janeiro, RJ (Brazil); Assireu, Arcilan Trevenzoli [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil)

    2008-07-01

    Monitoring the ocean conditions during offshore operations is essential for both operational and environmental aspects. Environmentally, not only to know better the environment where the activity is taking place, but also to be able to provide fast and accurate response in case of accidents. MONDO Project (Monitoring by Ocean Drifters) is a pioneer initiative from ENI Oil do Brasil and PROOCEANO that aimed to monitor currents as a part of a metoceanographic data monitoring project of drilling operations in Brazilian Waters, in Santos Basin throughout September to November 2007, 40 satellite tracked ocean drifters were deployed will be transmitting data up to November 2008. The results of this project can be used to study a wide range of subjects about ocean dynamics. Following the principles of social and environmental responsibility, MONDO Project aims to benefit the local ecosystem in increasing the scientific knowledge of the area to calibrate hydrodynamic models that will lead to more accurate modeling results and, as a consequence, to a better management of contingency plans. Based on these principles, the project will also provide unrestricted access to oceanographic data even after the end of operations. (author)

  11. EDF EPR project: operating principles validation and human factor engineering program

    Lefebvre, B.; Berard, E.; Arpino, J.-M.

    2005-01-01

    This article describes the specificities of the operating principles chosen by EDF for the EPR project as a result of an extensive Human Factor Engineering program successfully implemented in an industrial project context. The design process and its achievements benefit of the EDF experience feedback not only in term of NPP operation - including the fully computerized control room of the N4-serie - but also in term of NPP designer. The elements exposed hereafter correspond to the basic design phase of EPR HMI which has been completed and successfully validated by the end of 2003. The article aims to remind the context of the project which basically consists in designing a modern and efficient HMI taking into account the operating needs while relying on proven and reliable technologies. The Human Factor Engineering program implemented merges these both aspects by : 1) being fully integrated within the project activities and scheduling; 2) efficiently taking into account the users needs as well as the feasibility constraints by relying on a multidisciplinary design team including HF specialists, I and C specialists, Process specialists and experienced operator representatives. The resulting design process makes a wide use of experience feedback and experienced operator knowledge to complete largely the existing standards for providing a fully useable and successful design method in an industrial context. The article underlines the design process highlights that largely contribute to the successful implementation of a Human Factor Engineering program for EPR. (authors)

  12. Expansion of Michigan EOR Operations Using Advanced Amine Technology at a 600 MW Project Wolverine Carbon Capture and Storage Project

    H Hoffman; Y kishinevsky; S. Wu; R. Pardini; E. Tripp; D. Barnes

    2010-06-16

    Wolverine Power Supply Cooperative Inc, a member owned cooperative utility based in Cadillac Michigan, proposes to demonstrate the capture, beneficial utilization and storage of CO{sub 2} in the expansion of existing Enhanced Oil Recovery operations. This project is being proposed in response to the US Department of Energy Solicitation DE-FOA-0000015 Section III D, 'Large Scale Industrial CCS projects from Industrial Sources' Technology Area 1. The project will remove 1,000 metric tons per day of CO{sub 2} from the Wolverine Clean Energy Venture 600 MW CFB power plant owned and operated by WPC. CO{sub 2} from the flue gas will be captured using Hitachi's CO{sub 2} capture system and advanced amine technology. The capture system with the advanced amine-based solvent supplied by Hitachi is expected to significantly reduce the cost and energy requirements of CO{sub 2} capture compared to current technologies. The captured CO{sub 2} will be compressed and transported for Enhanced Oil Recovery and CO{sub 2} storage purposes. Enhanced Oil Recovery is a proven concept, widely used to recover otherwise inaccessible petroleum reserves. While post-combustion CO{sub 2} capture technologies have been tested at the pilot scale on coal power plant flue gas, they have not yet been demonstrated at a commercial scale and integrated with EOR and storage operations. Amine-based CO{sub 2} capture is the leading technology expected to be available commercially within this decade to enable CCS for utility and industrial facilities firing coal and waste fuels such as petroleum coke. However, traditional CO{sub 2} capture process utilizing commercial amine solvents is very energy intensive for regeneration and is also susceptible to solvent degradation by oxygen as well as SOx and NO{sub 2} in the flue gas, resulting in large operating costs. The large volume of combustion flue gas with its low CO{sub 2} concentration requires large equipment sizes, which together with the

  13. Early cost estimating for road construction projects using multiple regression techniques

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  14. Optimizing hourly hydro operations at the Salt Lake City Area integrated projects

    Veselka, T.D.; Hamilton, S.; McCoy, J.

    1995-01-01

    The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western's net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western's purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western's net revenue is computed

  15. Application of integrated logistic techniques to operation, maintenance and re engineering processes in Nuclear Power plants

    Santiago Diez, P.

    1997-01-01

    This paper addresses the advisability of adapting and applying management and Integrated Logistic engineering techniques to nuclear power plants instead of using more traditional maintenance management methods. It establishes a historical framework showing the origins of integrated approaches based on traditional logistic support concepts, their phases and the real results obtained in the aeronautic world where they originated. It reviews the application of integrated management philosophy, and logistic support and engineering analysis techniques regarding Availability, Reliability and Maintainability (ARM) and shows their inter dependencies in different phases of the system's life (Design, Development and Operation). It describes how these techniques are applied to nuclear power plant operation, their impact on plant availability and the optimisation of maintenance and replacement plans. The paper analyses the need for data (type and volume), which will have to be collected, and the different tools to manage such data. It examines the different CALS tools developed by EA for engineering and for logistic management. It also explains the possibility of using these tools for process and data operations through the INTERNET. It also focuses on the qualities of some simple examples of possible applications, and how they would be used in the framework of Integrated Logistic Support (ILS). (Author)

  16. Development of educational system for nuclear power plant operators using knowledge processing techniques

    Yoshimura, Seiichi

    1990-01-01

    It is important to carry out effective education optimally adapted to the operator's knowledge level for the enhancement of the operator's ability to deal with abnormal situations. This paper outlines the educational system that realizes effective education using knowledge-processing techniques. This system is composed of three devices. One is a knowledge-processing computer that evaluates the operator's knowledge level and presents educational materials optimally adapted to his knowledge level. Another is a computer for displaying transients and plant equipments. The other is a computer for voice input and output. The educational materials utilize cause-and-effect relationships. It is possible to perform effective education by pointing out the parts the operator failed to understand using the relationships. An evaluation test was performed using several tens of operators by actually operating the system and then impressions were gathered by questionnaire. As a result, the cause-and-effect relationships were proved to be useful to understand the transients. And the contents of the educational materials and the display pictures were also deemed to have practical value. (author)

  17. Reduction in energy consumption and operating cost in a dried corn warehouse using logistics techniques

    Korrakot Y. Tippayawong

    2013-06-01

    Full Text Available Corn is one of the major economic crops in Thailand. Corn postharvest operation involves various practices that consume a large amount of energy. Different energy conservation measures have been implemented but logistics consideration is not normally employed. In this work, attempt has been made to demonstrate that logistics techniques can offer a significant reduction in energy and cost. The main objective of this work is to identify and demonstrate possible approaches to improving energy efficiency and reducing operating cost for a dried corn warehouse operator. Three main problems are identified: (i relatively high fuel consumption for internal transfer process, (ii low quality of dried corn, and (iii excess expenditure on outbound transportation. Solutions are proposed and implemented using logistics operations. Improvement is achieved using plant layout and shortest path techniques, resulting in a reduction of almost 50% in energy consumption for the internal transfer process. Installation of an air distributor in the grain storage unit results in a decrease in loss due to poor-quality dried corn from 17% to 10%. Excess expenditure on dried corn distribution is reduced by 6% with application of a global positioning system.

  18. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  19. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  20. Cement technique for reducing post-operative bursitis after trochanteric fixation.

    Derman, Peter B; Horneff, John G; Kamath, Atul F; Garino, Jonathan

    2013-02-01

    Post-operative trochanteric bursitis is a known complication secondary to the surgical approach in total hip arthroplasty. This phenomenon may be partially attributable to repetitive microtrauma generated when soft tissues rub against implanted hardware. Significant rates of post-operative trochanteric bursitis have been observed following procedures in which a trochanteric fixation device, such as a bolt-washer mechanism or a cable-grip/claw system, is used to secure the trochanteric fragment after trochanteric osteotomy. We present a simple technique for use with a bolt-washer system or grip plate in which trochanteric components are covered in bone wax followed by a layer of cement to decrease friction and to diminish the risk of post-operative bursitis.

  1. Construction techniques and operation principles of Geiger-Mueller counters using external cathode (Mazetype)

    Sevegnani, F.X.

    1988-01-01

    The construction techniques for external cathode (Maze) and internal cathode Geiger-Muller counters are described, showing the operation principles and the used material nature. More than 200 counter types were evaluated analysing their characteristics. The influence of several types of guard-rings was studied, for optimizing counter operation conditions. Plateaus of the order of 700 V with slope of 0,3%/100 V for the net counting rate, and 1400 V with a slope of 0,8/100 V for total counts using total pressure of 10 cmHg, were obtained. A counter for β detection, using blown glass window in one of the edges of the cylinder was constructed. Counters of long life using materials such as, mica, adhesive glues, etc., were obtained. The results shown that the best counter operation occurs when it is empty in a vacuum of 10 -5 mmHg. (M.C.K.) [pt

  2. Operational Features of the Kamehameha Early Education Project. Technical Report #4.

    Gallimore, Ronald; And Others

    This report summarizes the operational features of the initial phases of the Kamehameha Early Education Project (KEEP). The rationale for KEEP's focus on conducting research on programs similar to those in the public schools rather than on developing radically innovative educational programs is discussed. Start up procedures such as recruitment of…

  3. Using accounting information systems by operations managers in a project company

    Wouters, Marc; van der Veeken, Henk J.M.

    2002-01-01

    This paper describes the results of a case study that investigated the use of accounting information by operations managers in a road building company. There was considerable preplanning before the execution of project activities, but task uncertainty during execution created the need to take

  4. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  5. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  6. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  7. The Quest CCS Project - MMV Technology Deployment Through Two Years of Operation

    O'Brien, S.

    2017-12-01

    In September 2012, Shell, on behalf of the Athabasca Oil Sands Project venture (Shell Canada Energy, Chevron Canada Limited, Marathon Oil Canada Corporation), announced that it was proceeding to construct the Quest Carbon Capture and Storage (CCS) project near Fort Saskatchewan. Quest is the world's first large-scale commercial application of CCS at an oil sands operation, and it is now capturing more than one million tonnes of CO2 per year from the Scotford Upgrader. It is a fully integrated project, involving CO2 capture at the bitumen upgrader, transportation along a 65 km pipeline, and CO2 storage in a deep saline aquifer (the Basal Cambrian Sands). Construction was completed in August 2015, and the Quest project was certified for commercial operation in September 2015. The Measurement, Monitoring and Verification (MMV) program for Quest is comprehensive, with a variety of technologies being used to monitor the atmosphere, hydrosphere, biosphere and geosphere. These include a Lightsource system for atmospheric monitoring, extensive groundwater sampling, DAS VSPs to assess the development of the CO2 plume, a microseismic array to measure any induced seismic activity, and temperature and pressure gauges for reservoir monitoring. Over two years of operations, this program has been optimized to address key risks while improving operational efficiency. Quest has now successfully captured and stored more than 2 million tonnes of CO2 with no MMV indications of any storage issues.

  8. Toeplitz Operators, Pseudo-Homogeneous Symbols, and Moment Maps on the Complex Projective Space

    Miguel Antonio Morales-Ramos

    2017-01-01

    Full Text Available Following previous works for the unit ball due to Nikolai Vasilevski, we define quasi-radial pseudo-homogeneous symbols on the projective space and obtain the corresponding commutativity results for Toeplitz operators. A geometric interpretation of these symbols in terms of moment maps is developed. This leads us to the introduction of a new family of symbols, extended pseudo-homogeneous, that provide larger commutative Banach algebras generated by Toeplitz operators. This family of symbols provides new commutative Banach algebras generated by Toeplitz operators on the unit ball.

  9. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  10. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  11. Application of Project Time Management Tools and Techniques to the Construction Industry in the Gaza Strip

    Nabil Sawalhi

    2012-11-01

    Full Text Available The objective of this paper is to investigate the level of applying theproject time management tools and techniques by public ownersand construction contractors in the Gaza Strip. This study hasbeen conducted by means of a survey questionnaire. Seventythreequestionnaires were distributed to target constructioncontractors and twenty-five questionnaires to public owners. Sixtycompleted questionnaires from contractors and twenty-threequestionnaires from public owners were received and analysed.The survey results indicated that contemporary project timemanagement tools and techniques are not widely used amonglocal contractors and owners. Lack of subcontractor’s knowledgeand awareness of the importance of project time managementtools and techniques are still major obstacles toward the efficientutilisation of such tools. This study recommended that there is anurgent need to establish a professional industry body such as anInstitute of Building to review and evaluate existing local projectmanagement practices. This professional body may be establishedby the government through the Ministry of Housing and PublicWorks or by the local university in cooperation with a similarinternational professional industry body. Current training effortshould be tailored to encourage owners and contractors to usework breakdown structures, resource optimisation, and networkscheduling.

  12. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  13. Capital planning for operating theatres based on projecting future theatre requirements.

    Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill

    2011-05-01

    During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.

  14. Web based concept project for information and communication of monitoring policy and techniques

    Levy, D. S.; Sordi, G. M. A. A.

    2014-08-01

    Information and Communication Technology (ICT) is growing in Brazil and worldwide. The servers processing power added to the technology of relational databases allow to integrate information from different sources, enabling complex queries with reduced response time. We believe that the use of information technology for the radiological protection programs for human activities shall help greatly the radioactive facility that requires such use. Therefore, this project aims the informatization of the monitoring policy and techniques in Portuguese, providing Brazilian radioactive facilities a complete repository for research, consultation and information in a quick, integrated and efficient way. In order to meet national and international standards, the development of this project includes concepts, definitions and theory about monitoring procedures in order to interrelate information, currently scattered in several publications and documents, in a consistent and appropriate manner. The Web platform tools and functionalities were developed according to our target public needs, regarding new possibilities of media, like mobile access, feeds of content and information sharing. Moreover, taking into account this is a pioneer project with the prospect of long-term use, our challenge involves the combination of multiple computer technologies that allows a robust, effective, and flexible system, which can be easily adapted according to future technological innovations. This pioneer project shell help greatly both radioactive facilities and researchers, and it is our target to make it an international reference for Portuguese Spoken countries. (Author)

  15. Web based concept project for information and communication of monitoring policy and techniques

    Levy, D. S.; Sordi, G. M. A. A., E-mail: info@uniprorad.com.br [Instituto de Pesquisas Energeticas e Nucleares / CNEN, Av. Lineu Prestes 2242, Cidade Universitaria, 05508-000 Sao Paulo (Brazil)

    2014-08-15

    Information and Communication Technology (ICT) is growing in Brazil and worldwide. The servers processing power added to the technology of relational databases allow to integrate information from different sources, enabling complex queries with reduced response time. We believe that the use of information technology for the radiological protection programs for human activities shall help greatly the radioactive facility that requires such use. Therefore, this project aims the informatization of the monitoring policy and techniques in Portuguese, providing Brazilian radioactive facilities a complete repository for research, consultation and information in a quick, integrated and efficient way. In order to meet national and international standards, the development of this project includes concepts, definitions and theory about monitoring procedures in order to interrelate information, currently scattered in several publications and documents, in a consistent and appropriate manner. The Web platform tools and functionalities were developed according to our target public needs, regarding new possibilities of media, like mobile access, feeds of content and information sharing. Moreover, taking into account this is a pioneer project with the prospect of long-term use, our challenge involves the combination of multiple computer technologies that allows a robust, effective, and flexible system, which can be easily adapted according to future technological innovations. This pioneer project shell help greatly both radioactive facilities and researchers, and it is our target to make it an international reference for Portuguese Spoken countries. (Author)

  16. A technique for estimating 4D-CBCT using prior knowledge and limited-angle projections

    Zhang, You; Yin, Fang-Fang; Ren, Lei; Segars, W. Paul

    2013-01-01

    Purpose: To develop a technique to estimate onboard 4D-CBCT using prior information and limited-angle projections for potential 4D target verification of lung radiotherapy.Methods: Each phase of onboard 4D-CBCT is considered as a deformation from one selected phase (prior volume) of the planning 4D-CT. The deformation field maps (DFMs) are solved using a motion modeling and free-form deformation (MM-FD) technique. In the MM-FD technique, the DFMs are estimated using a motion model which is extracted from planning 4D-CT based on principal component analysis (PCA). The motion model parameters are optimized by matching the digitally reconstructed radiographs of the deformed volumes to the limited-angle onboard projections (data fidelity constraint). Afterward, the estimated DFMs are fine-tuned using a FD model based on data fidelity constraint and deformation energy minimization. The 4D digital extended-cardiac-torso phantom was used to evaluate the MM-FD technique. A lung patient with a 30 mm diameter lesion was simulated with various anatomical and respirational changes from planning 4D-CT to onboard volume, including changes of respiration amplitude, lesion size and lesion average-position, and phase shift between lesion and body respiratory cycle. The lesions were contoured in both the estimated and “ground-truth” onboard 4D-CBCT for comparison. 3D volume percentage-difference (VPD) and center-of-mass shift (COMS) were calculated to evaluate the estimation accuracy of three techniques: MM-FD, MM-only, and FD-only. Different onboard projection acquisition scenarios and projection noise levels were simulated to investigate their effects on the estimation accuracy.Results: For all simulated patient and projection acquisition scenarios, the mean VPD (±S.D.)/COMS (±S.D.) between lesions in prior images and “ground-truth” onboard images were 136.11% (±42.76%)/15.5 mm (±3.9 mm). Using orthogonal-view 15°-each scan angle, the mean VPD/COMS between the lesion

  17. Pre operational background radiation monitoring around Kudankulam Nuclear Power Project site - a decade long experience

    Vijayakumar, B.; George, Thomas; Sundara Rajan, P.; Selvi, B.S.; Balamurugan, M.; Pandit, G.G.; Ravi, P.M.; Tripathi, R.M.

    2014-01-01

    Pre-operational environmental background radiation monitoring around nuclear power plants is very important to understand baseline values existing in the site and also to identify any hot spots of naturally occurring high background radiation areas and their sources. These baseline measurements will act as a benchmark for future comparison after the reactors go into operation. The radiation measurements are continued during the operational phase of the plant and the results are compared to see whether there is any impact of the operation of the plant on the environment. A comprehensive background radiation monitoring plan has been in vogue at site from 2004 to meet this objective. This paper describes the different monitoring strategies adopted around Kudankulam Nuclear Power Project site and throws light on the pre operational background radiation levels in the environment

  18. Perceptual derailment and confabulation in the Rorschach projective technique: a clinical report

    Giovanni Genovese

    2015-12-01

    Full Text Available Perceptual derailment and confabulations often appear in a subtle way, being processes addressable to the field of inner world, conditioning the diagnostic process. The present clinical report aims to explore the role of Rorschach projective technique in eliciting processes otherwise unsearchable. Psycho-diagnostics data were compared to other psychometric tests such as the MMPI-2 (Minnesota Multiphasic Personality Inventory and the POMS (Profile of Mood States at time 0 and time 1 (after six months. Among these, the exploration of the projective process was crucial to understand the patient's mental functioning, as an elective instrument,  thanks to its ambiguous nature, which leads to effectively explore both the inner world and the cognitive processes.

  19. Vietnam Project For Production Of Radioactive Beam Based On ISOL Technique With The Dalat Reactor

    Le Hong Khiem; Phan Viet Cuong; Fadi Ibrahim

    2011-01-01

    The presence in Vietnam of Dalat nuclear reactor dedicated to fundamental studies is a unique opportunity to produce Radioactive Ion (RI) Beams with the fission of a 235 U induced by the thermal neutrons produced by the reactor. We propose to produce RI beams at the Dalat nuclear reactor using ISOL (Isotope Separation On-Line) technique. This project should be a unique opportunity for Vietnamese nuclear physics community to use its own facilities to produce RI beams for studying nuclear physics at an international level. (author)

  20. Searching for the Unknowable: A Process of Detection — Abductive Research Generated by Projective Techniques

    Miri Levin-Rozalis

    2004-06-01

    Full Text Available This article looks at the process of doing research ‘from scratch.’ The author began a project investigating children of Ethiopian origin living in Israel to see how ones who attended a kindergartern program years earlier differed from those who had not attended. However, the problem from the outset was that there may not be a difference to find. In this article, the author compares inductive, deductive, and abductive reasoning, and argues that abductive reasoning is the proper technique when nothing is known about the research at the outset.

  1. Experiences with IAEA project: TC Regional Project on Quality Control and Quality Assurance for Nuclear Analytical Techniques (RER/2/004)

    Glavic-Cindro, Denis; Korun, Matjaz

    2002-01-01

    In the TC Regional Project on Quality Control and Quality Assurance for Nuclear Analytical Techniques RER/2/004, 12 laboratories from east and central European countries participated. Within this project 4 workshops, 2 audit inspections and 2 proficiency tests were organized. The aim of this project was to help these laboratories to implement quality assurance system based on the ISO 17025 standard and to help them on the way towards accreditation. (author)

  2. [Application of the technique of analytical structure of project for the sub-project of websites catalog of the Virtual Health Library-Nursing].

    dos, Santos Luís Augusto; Marin, Heimar de Fátima; Marques, Isaac Rosa; Cunha, Isabel Cristina Kowal Olm

    2007-01-01

    This work intents, in a didactic form, to explain the benefits of use of a technique of project management, named Work Breakdown Structure: a graphical tool to identify the main results to be developed in a project. The real examples are applied to a sub-project of the Virtual Library in Health in Nursing (BVS-Enfermagem) to development of the Sites Catalogs. The benefits of graphical visualization for a major agreement between professionals of different expertise are presented.

  3. A Coordinated Research Project on the Implementation of Nuclear Techniques to Improve Food Traceability

    Frew, Russell; Cannavan, Andrew; Zandric, Zora; Maestroni, Britt; Abrahim, Aiman

    2013-04-01

    Traceability systems play a key role in assuring a safe and reliable food supply. Analytical techniques harnessing the spatial patterns in distribution of stable isotope and trace element ratios can be used for the determination of the provenance of food. Such techniques offer the potential to enhance global trade by providing an independent means of verifying "paper" traceability systems and can also help to prove authenticity, to combat fraudulent practices, and to control adulteration, which are important issues for economic, religious or cultural reasons. To address some of the challenges that developing countries face in attempting to implement effective food traceability systems, the IAEA, through its Joint FAO/IAEA Division on Nuclear Techniques in Food and Agriculture, has initiated a 5-year coordinated research project involving institutes in 15 developing and developed countries (Austria, Botswana, Chile, China, France, India, Lebanon, Morocco, Portugal, Singapore, Sweden, Thailand, Uganda, UK, USA). The objective is to help in member state laboratories to establish robust analytical techniques and databases, validated to international standards, to determine the provenance of food. Nuclear techniques such as stable isotope and multi-element analysis, along with complementary methods, will be applied for the verification of food traceability systems and claims related to food origin, production, and authenticity. This integrated and multidisciplinary approach to strengthening capacity in food traceability will contribute to the effective implementation of holistic systems for food safety and control. The project focuses mainly on the development of techniques to confirm product authenticity, with several research partners also considering food safety issues. Research topics encompass determination of the geographical origin of a variety of commodities, including seed oils, rice, wine, olive oil, wheat, orange juice, fish, groundnuts, tea, pork, honey and

  4. Implementation of the neutron noise technique under the UBERA-6 project

    Gomez, Angel; Bellino, Pablo A.

    2009-01-01

    Using the neutron noise technique, kinetics parameters estimations and power calibration were performed in the new core of the RA-6 reactor. These activities were carried on under the nuclear start-up of the UBERA-6 project, which consist in the change of core and power increase of the reactor. In a first stage, in joint with the power estimation, the decay constant of the prompt neutrons (α c ) was estimated. Its value was found to agree with the calculations obtained from neutron codes. Lately, in the high power stage, estimators of the calibration factors for the 16 N detection device were obtained. A thorough analysis of the linearity of the instrumentation used was done, and an alternative methodology was applied in order to estimate the aforementioned factor. The calibration factor obtained by the neutron noise technique was in agreement with the one obtained by thermal balance. (author)

  5. Development of non-intrusive monitoring techniques - ESDRED and TEM projects at Mont Terri and the Grimsel test site

    Breen, B.; Johnson, M.; Frieg, B.; Blechschmidt, I.; Manukyan, E.; Marelli, S.; Maurer, H.R.

    2008-01-01

    The EC Integrated Project, IP ESDRED (Engineering Studies and Demonstration of Repository Designs) was commissioned to establish a sound technical basis for demonstrating the safety of disposing of spent fuel and long-lived radioactive wastes in deep geological formations and to underpin the development of a common European view on the main issues related to the management and disposal of radioactive waste. The in situ development of non-intrusive monitoring techniques is included within the programme as an important component of the overall ESDRED programme. Monitoring will play an important role in providing information to the repository operator and to society in general and to support decision-making about if and when, to move from one phase to the next. The challenges, when constructing engineered barrier systems (EBS) to isolate the waste, is the ability to monitor the waste and the barriers, once isolated. Conventional monitoring systems depend upon wires or cable s to transfer information from the monitoring sensors outside the barriers. Monitoring sensors also have a limited lifetime and new sensors cannot be emplaced without disturbing the barrier. The development of non-intrusive monitoring systems which do not rely upon 'hard-wired' connection, thus providing the opportunity for continued monitoring after isolation. The ESDRED partners developed a programme utilising cross-hole seismic tomography to monitor an experimental demonstration by Nagra at Mont Terri Underground Research Laboratory (URL). The work programme includes PhD studies to conduct full seismic waveform analysis and to develop algorithms to address natural anisotropy in the Opalinus clay at Mont Terri. Following on from the ESDRED developments, some of ESDRED partner organisations identified a further opportunity for developing in situ monitoring techniques utilising the construction and testing programme of a low pH shotcrete plug being constructed in granite at the Grimsel Test Site

  6. Joint-operation in water resources project in Indonesia: Integrated or non-integrated

    Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny

    2017-11-01

    The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.

  7. Inverted Nipple Correction with Selective Dissection of Lactiferous Ducts Using an Operative Microscope and a Traction Technique.

    Sowa, Yoshihiro; Itsukage, Sizu; Morita, Daiki; Numajiri, Toshiaki

    2017-10-01

    An inverted nipple is a common congenital condition in young women that may cause breastfeeding difficulty, psychological distress, repeated inflammation, and loss of sensation. Various surgical techniques have been reported for correction of inverted nipples, and all have advantages and disadvantages. Here, we report a new technique for correction of an inverted nipple using an operative microscope and traction that results in low recurrence and preserves lactation function and sensation. Between January 2010 and January 2013, we treated eight inverted nipples in seven patients with selective lactiferous duct dissection using an operative microscope. An opposite Z-plasty was added at the junction of the nipple and areola. Postoperatively, traction was applied through an apparatus made from a rubber gasket attached to a sterile syringe. Patients were followed up for 15-48 months. Adequate projection was achieved in all patients, and there was no wound dehiscence or complications such as infection. Three patients had successful pregnancies and subsequent breastfeeding that was not adversely affected by the treatment. There was no loss of sensation in any patient during the postoperative period. Our technique for treating an inverted nipple is effective and preserves lactation function and nipple sensation. The method maintains traction for a longer period, which we believe increases the success rate of the surgery for correction of severely inverted nipples. This journal requires that authors assign a level of evidence to each article. For a full description of these Evidence-Based Medicine ratings, please refer to the Table of Contents or the online Instructions to Authors www.springer.com/00266 .

  8. Operating test report for project W-417, T-plant steam removal upgrade, waste transfer portion

    Myers, N.K.

    1997-01-01

    This Operating Test Report (OTR) documents the performance results of the Operating Test Procedure HNF-SD-W417-OTP-001 that provides steps to test the waste transfer system installed in the 221-T Canyon under project W-417. Recent modifications have been performed on the T Plant Rail Car Waste Transfer System. This Operating Test Procedure (OTP) will document the satisfactory operation of the 221-T Rail Car Waste Transfer System modified by project W-417. Project W-417 installed a pump in Tank 5-7 to replace the steam jets used for transferring liquid waste. This testing is required to verify that operational requirements of the modified transfer system have been met. Figure 2 and 3 shows the new and existing system to be tested. The scope of this testing includes the submersible air driven pump operation in Tank 5-7, liquid waste transfer operation from Tank 5-7 to rail car (HO-IOH-3663 or HO-IOH-3664), associated line flushing, and the operation of the flow meter. This testing is designed to demonstrate the satisfactory operation-of the transfer line at normal operating conditions and proper functioning of instruments. Favorable results will support continued use of this system for liquid waste transfer. The Functional Design Criteria for this system requires a transfer flow rate of 40 gallons per minute (GPM). To establish these conditions the pump will be supplied up to 90 psi air pressure from the existing air system routed in the canyon. An air regulator valve will regulate the air pressure. Tank capacity and operating ranges are the following: Tank No. Capacity (gal) Operating Range (gal) 5-7 10,046 0 8040 (80%) Rail car (HO-IOH-3663 HO-IOH-3664) 097219,157 Existing Tank level instrumentation, rail car level detection, and pressure indicators will be utilized for acceptance/rejection Criteria. The flow meter will be verified for accuracy against the Tank 5-7 level indicator. The level indicator is accurate to within 2.2 %. This will be for information only

  9. Multiscale Support Vector Learning With Projection Operator Wavelet Kernel for Nonlinear Dynamical System Identification.

    Lu, Zhao; Sun, Jing; Butts, Kenneth

    2016-02-03

    A giant leap has been made in the past couple of decades with the introduction of kernel-based learning as a mainstay for designing effective nonlinear computational learning algorithms. In view of the geometric interpretation of conditional expectation and the ubiquity of multiscale characteristics in highly complex nonlinear dynamic systems [1]-[3], this paper presents a new orthogonal projection operator wavelet kernel, aiming at developing an efficient computational learning approach for nonlinear dynamical system identification. In the framework of multiresolution analysis, the proposed projection operator wavelet kernel can fulfill the multiscale, multidimensional learning to estimate complex dependencies. The special advantage of the projection operator wavelet kernel developed in this paper lies in the fact that it has a closed-form expression, which greatly facilitates its application in kernel learning. To the best of our knowledge, it is the first closed-form orthogonal projection wavelet kernel reported in the literature. It provides a link between grid-based wavelets and mesh-free kernel-based methods. Simulation studies for identifying the parallel models of two benchmark nonlinear dynamical systems confirm its superiority in model accuracy and sparsity.

  10. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  11. A recurrent neural network based on projection operator for extended general variational inequalities.

    Liu, Qingshan; Cao, Jinde

    2010-06-01

    Based on the projection operator, a recurrent neural network is proposed for solving extended general variational inequalities (EGVIs). Sufficient conditions are provided to ensure the global convergence of the proposed neural network based on Lyapunov methods. Compared with the existing neural networks for variational inequalities, the proposed neural network is a modified version of the general projection neural network existing in the literature and capable of solving the EGVI problems. In addition, simulation results on numerical examples show the effectiveness and performance of the proposed neural network.

  12. Radiographic analysis of the temporomandibular joint by the standardized projection technique

    Choe, Han Up; Park, Tae Won

    1983-01-01

    The purpose of this study was to investigate the radiographic images of the condylar head in clinically normal subjects and the TMJ patients using standardized projection technique. 45 subjects who have not clinical evidence of TMJ problems and 96 patients who have the clinical evidence of TMJ problems were evaluated, but the patients who had fracture, trauma and tumor on TMJ area were discluded in this study. For the evaluation of radiographic images, the author has observed the condylar head positions in closed mouth and 2.54 cm open mouth position taken by the standardized transcranial oblique lateral projection technique. The results were as follow: 1. In closed mouth position, the crest of condylar head took relatively posterior position to the deepest point of the glenoid fossa in 8.9% of the normals and in 26.6% of TMJ patients. 2. In 2.54 cm open mouth position, condylar head took relatively posterior position to the articular eminence in 2 .2% of TMJ patients and 39.6% of the normals. 3. In open mouth position, the horizontal distance from the deepest point of the glenoid fossa to the condylar head was 13.96 mm in the normals and 10.68 mm in TMJ patients. 4. The distance of true movement of condylar head was 13.49 mm in the normals and 10.27 mm in TMJ patients. 5. The deviation of mandible in TMJ patients was slightly greater than of the normals.

  13. Innovative operating modes and techniques for the spaceborne imaging radar-C instrument

    Huneycutt, Bryan L.

    1990-01-01

    The operation of the spaceborne imaging radar-C (SIR-C) is discussed. The SIR-C instrument has been designed to obtain simultaneous multifrequency and simultaneous multipolarization radar images from a low earth orbit. It is a multiparameter imaging radar which will be flown during at least two different seasons. The instrument has been designed to operate in innovative modes such as the squint alignment mode, the extended aperture mode, the scansar mode, and the interferometry mode. The instrument has been designed to demonstrate innovative engineering techniques such as beam nulling for echo tracking, pulse-repetition frquency hopping for Doppler centroid tracking, generating the frequency step chirp for radar parameter flexibility, block floating point quantizing for data rate compression, and elevation beamwidth broadening for increasing the swath illumination.

  14. An application of A.I. techniques for the support of emergency operation

    Jeong, Kwang-Sub; Yang, Joon-On; Park, C.K.

    1991-01-01

    For the support of emergency operation, COSMOS is being developed at KAERI using A.I. techniques. COSMOC consists of two parts; one is to identify CSF's status and to determine the overall response strategy and the other to generate a set of success paths which restore the challenged CSF's and to rank them. The status of CSF is identified by the rule-based reasoning. The overall response strategy is inferred according to the identified CSF's status. The success paths are generated by the given structure descriptions of systems and the general generation algorithm. Backtracking, an inherent feature of the Prolog language, is used for the search of next success path. Generated success paths are ranked according to either its respective reliability or the number of manual operator's actions required to complete each success path. For efficient man-machine interface, a color graphic display is utilized. COSMOS is being built on a workstation. (author)

  15. Using Enhanced Frequency Domain Decomposition as a Robust Technique to Harmonic Excitation in Operational Modal Analysis

    Jacobsen, Niels-Jørgen; Andersen, Palle; Brincker, Rune

    2006-01-01

    The presence of harmonic components in the measured responses is unavoidable in many applications of Operational Modal Analysis. This is especially true when measuring on mechanical structures containing rotating or reciprocating parts. This paper describes a new method based on the popular...... agreement is found and the method is proven to be an easy-to-use and robust tool for handling responses with deterministic and stochastic content....... Enhanced Frequency Domain Decomposition technique for eliminating the influence of these harmonic components in the modal parameter extraction process. For various experiments, the quality of the method is assessed and compared to the results obtained using broadband stochastic excitation forces. Good...

  16. A time-dependent event tree technique for modelling recovery operations

    Kohut, P.; Fitzpatrick, R.

    1991-01-01

    The development of a simplified time dependent event tree methodology is presented. The technique is especially applicable to describe recovery operations in nuclear reactor accident scenarios initiated by support system failures. The event tree logic is constructed using time dependent top events combined with a damage function that contains information about the final state time behavior of the reactor core. Both the failure and the success states may be utilized for the analysis. The method is illustrated by modeling the loss of service water function with special emphasis on the RCP [reactor coolant pump] seal LOCA [loss of coolant accident] scenario. 5 refs., 2 figs., 2 tabs

  17. Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying (CVD) Facility Operations Manual

    IRWIN, J.J.

    2000-02-03

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of the Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the spent nuclear fuel project (SNFP) Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  18. Spent Nuclear Fuel (SNF) Project Cold Vacuum Drying (CVD) Facility Operations Manual

    IRWIN, J.J.

    2000-01-01

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of the Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the spent nuclear fuel project (SNFP) Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  19. IUE project comes to an end after 18+ years of extremely successful orbital operations

    1996-08-01

    At a meeting of the Science Programme Committee (SPC) of the European Space Agency (ESA) in February, the decision was taken to terminate the orbital operations of the International Ultraviolet Explorer (IUE) satellite on September 30. Science operations will terminate shortly before that date to allow the necessary end-of-life testing of the spacecraft. Only a year ago, when NASA - the major partner in the IUE project - decided to terminate its IUE science operations, ESA had been able to extend its support to include full responsibility for the scientific operations, under the "hybrid science operations" scheme, and thus maintain this important capability for the astrophysics community. As a consequence of the budgetary restrictions placed on ESA's Science Programme, the earlier recommendation of the Space Science Advisory Committee (SSAC), to terminate the operations of IUE in coordination with NASA in September, was accepted by the SPC. The IUE project, using a 45cm ultraviolet telescope for spectroscopic observations in the waveband 115 to 320 nm, has been carried out jointly by NASA, ESA and the British PPARC (formerly SERC). Launched in 1978, its designed lifetime was only three years. In July, the SPC agreed to complete the IUE Final Archive by the end of 1997, allowing the project to reprocess all its spectroscopic observations (numbering over 100,000) with a newly designed reduction, significantly improving on the normal direct processing done during the operational phase of the IUE project. The resulting homogeneous data archive on the ultraviolet radiation of cosmic sources, collected over the 18+ years of the operational project, will remain an important resource for astrophysical studies for many years to come. This has been one of the most successful astrophysics projects in space science, with more than 3,500 papers in refereed journals based on the observational results of the spectrographs. Over 500 doctoral dissertations have used its results

  20. Evaluation of communication characteristics of operating teams in NPPs using SNA technique

    Kim, H. J.; Lee, S. W.; Kang, H. G.; Seong, P. H. [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Park, J. K. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kang, H. G. [Khalifa Univ. of Science, Abu Dhabi (United Arab Emirates)

    2012-03-15

    Inappropriate communications within operational teams can lead to serious consequences of a system since it can cause lack of exchange of important information to perform the task to secure the safety of the system in nuclear power plants (NPPs). For that reason, we studied the communication characteristics However, existing studies on the communication characteristics seem to have problem since they have characterized team communications from a single perspective. According that, we have developed an evaluation method to characterize team communications using social network techniques which can evaluate them from various perspectives which are group cohesiveness, frequency of communications, degree of hierarchy, and communication contents. In addition, we suggested some kids of specific communication characteristics of operating teams that can reduce the occurrence of inappropriate communications. Eight verbal protocol data which are audio-visual recorded under emergency training sessions by main control room (MCR) operating teams are used. As a result of the study, there was negative relationship between group cohesiveness and the ratio of inappropriate communications. Moreover, some kinds of specific communication contents are related to the ratio of inappropriate communications. Consequently, we can evaluate communications characteristics of operating teams in NPPs and suggest specific characteristics to provide useful insights to prevent inappropriate communications.

  1. Evaluation of communication characteristics of operating teams in NPPs using SNA technique

    Kim, H. J.; Lee, S. W.; Kang, H. G.; Seong, P. H.; Park, J. K.; Kang, H. G.

    2012-01-01

    Inappropriate communications within operational teams can lead to serious consequences of a system since it can cause lack of exchange of important information to perform the task to secure the safety of the system in nuclear power plants (NPPs). For that reason, we studied the communication characteristics However, existing studies on the communication characteristics seem to have problem since they have characterized team communications from a single perspective. According that, we have developed an evaluation method to characterize team communications using social network techniques which can evaluate them from various perspectives which are group cohesiveness, frequency of communications, degree of hierarchy, and communication contents. In addition, we suggested some kids of specific communication characteristics of operating teams that can reduce the occurrence of inappropriate communications. Eight verbal protocol data which are audio-visual recorded under emergency training sessions by main control room (MCR) operating teams are used. As a result of the study, there was negative relationship between group cohesiveness and the ratio of inappropriate communications. Moreover, some kinds of specific communication contents are related to the ratio of inappropriate communications. Consequently, we can evaluate communications characteristics of operating teams in NPPs and suggest specific characteristics to provide useful insights to prevent inappropriate communications

  2. AI techniques for optimizing multi-objective reservoir operation upon human and riverine ecosystem demands

    Tsai, Wen-Ping; Chang, Fi-John; Chang, Li-Chiu; Herricks, Edwin E.

    2015-11-01

    Flow regime is the key driver of the riverine ecology. This study proposes a novel hybrid methodology based on artificial intelligence (AI) techniques for quantifying riverine ecosystems requirements and delivering suitable flow regimes that sustain river and floodplain ecology through optimizing reservoir operation. This approach addresses issues to better fit riverine ecosystem requirements with existing human demands. We first explored and characterized the relationship between flow regimes and fish communities through a hybrid artificial neural network (ANN). Then the non-dominated sorting genetic algorithm II (NSGA-II) was established for river flow management over the Shihmen Reservoir in northern Taiwan. The ecosystem requirement took the form of maximizing fish diversity, which could be estimated by the hybrid ANN. The human requirement was to provide a higher satisfaction degree of water supply. The results demonstrated that the proposed methodology could offer a number of diversified alternative strategies for reservoir operation and improve reservoir operational strategies producing downstream flows that could meet both human and ecosystem needs. Applications that make this methodology attractive to water resources managers benefit from the wide spread of Pareto-front (optimal) solutions allowing decision makers to easily determine the best compromise through the trade-off between reservoir operational strategies for human and ecosystem needs.

  3. Comparison of adaptive statistical iterative and filtered back projection reconstruction techniques in brain CT

    Ren, Qingguo; Dewan, Sheilesh Kumar; Li, Ming; Li, Jianying; Mao, Dingbiao; Wang, Zhenglei; Hua, Yanqing

    2012-01-01

    Purpose: To compare image quality and visualization of normal structures and lesions in brain computed tomography (CT) with adaptive statistical iterative reconstruction (ASIR) and filtered back projection (FBP) reconstruction techniques in different X-ray tube current–time products. Materials and methods: In this IRB-approved prospective study, forty patients (nineteen men, twenty-one women; mean age 69.5 ± 11.2 years) received brain scan at different tube current–time products (300 and 200 mAs) in 64-section multi-detector CT (GE, Discovery CT750 HD). Images were reconstructed with FBP and four levels of ASIR-FBP blending. Two radiologists (please note that our hospital is renowned for its geriatric medicine department, and these two radiologists are more experienced in chronic cerebral vascular disease than in neoplastic disease, so this research did not contain cerebral tumors but as a discussion) assessed all the reconstructed images for visibility of normal structures, lesion conspicuity, image contrast and diagnostic confidence in a blinded and randomized manner. Volume CT dose index (CTDI vol ) and dose-length product (DLP) were recorded. All the data were analyzed by using SPSS 13.0 statistical analysis software. Results: There was no statistically significant difference between the image qualities at 200 mAs with 50% ASIR blending technique and 300 mAs with FBP technique (p > .05). While between the image qualities at 200 mAs with FBP and 300 mAs with FBP technique a statistically significant difference (p < .05) was found. Conclusion: ASIR provided same image quality and diagnostic ability in brain imaging with greater than 30% dose reduction compared with FBP reconstruction technique

  4. Comparison of adaptive statistical iterative and filtered back projection reconstruction techniques in brain CT

    Ren, Qingguo, E-mail: renqg83@163.com [Department of Radiology, Hua Dong Hospital of Fudan University, Shanghai 200040 (China); Dewan, Sheilesh Kumar, E-mail: sheilesh_d1@hotmail.com [Department of Geriatrics, Hua Dong Hospital of Fudan University, Shanghai 200040 (China); Li, Ming, E-mail: minli77@163.com [Department of Radiology, Hua Dong Hospital of Fudan University, Shanghai 200040 (China); Li, Jianying, E-mail: Jianying.Li@med.ge.com [CT Imaging Research Center, GE Healthcare China, Beijing (China); Mao, Dingbiao, E-mail: maodingbiao74@163.com [Department of Radiology, Hua Dong Hospital of Fudan University, Shanghai 200040 (China); Wang, Zhenglei, E-mail: Williswang_doc@yahoo.com.cn [Department of Radiology, Shanghai Electricity Hospital, Shanghai 200050 (China); Hua, Yanqing, E-mail: cjr.huayanqing@vip.163.com [Department of Radiology, Hua Dong Hospital of Fudan University, Shanghai 200040 (China)

    2012-10-15

    Purpose: To compare image quality and visualization of normal structures and lesions in brain computed tomography (CT) with adaptive statistical iterative reconstruction (ASIR) and filtered back projection (FBP) reconstruction techniques in different X-ray tube current–time products. Materials and methods: In this IRB-approved prospective study, forty patients (nineteen men, twenty-one women; mean age 69.5 ± 11.2 years) received brain scan at different tube current–time products (300 and 200 mAs) in 64-section multi-detector CT (GE, Discovery CT750 HD). Images were reconstructed with FBP and four levels of ASIR-FBP blending. Two radiologists (please note that our hospital is renowned for its geriatric medicine department, and these two radiologists are more experienced in chronic cerebral vascular disease than in neoplastic disease, so this research did not contain cerebral tumors but as a discussion) assessed all the reconstructed images for visibility of normal structures, lesion conspicuity, image contrast and diagnostic confidence in a blinded and randomized manner. Volume CT dose index (CTDI{sub vol}) and dose-length product (DLP) were recorded. All the data were analyzed by using SPSS 13.0 statistical analysis software. Results: There was no statistically significant difference between the image qualities at 200 mAs with 50% ASIR blending technique and 300 mAs with FBP technique (p > .05). While between the image qualities at 200 mAs with FBP and 300 mAs with FBP technique a statistically significant difference (p < .05) was found. Conclusion: ASIR provided same image quality and diagnostic ability in brain imaging with greater than 30% dose reduction compared with FBP reconstruction technique.

  5. The economic and social significance of RCA regional co-operative projects

    Fowler, E.E.

    1979-01-01

    The regional Co-operative Agreement for Research, Development and Training Related to Nuclear Science and Technology (RCA) is an established and valuable instrument between the International Atomic Energy Agency (IAEA) and Member States in South Asia, Southeast Asia and the Pacific or Far East for assisting in the transfer of modern technology to areas having economic and social importance to the region. The purpose of this review is to identify on-going or planned work which is designed to help achieve this goal. Currently approved RCA Regional Co-operative Research Projects are listed

  6. Department of Energy Operation Quality Assurance Program for the Waste Isolation Pilot Plant (WIPP) Project (Carlsbad, New Mexico)

    1987-12-01

    The purpose of this plan is to describe the Quality Assurance (QA)reverse arrow Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Project Participants: the Scientific Advisor (Sandia National Laboratory) and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the Pre-Operational and Operational phases of the WIPP Project not addressed under the construction phase. This plan also requires the QA Programs for DOE and Project Participants to be structured so as to comply with this plan and ANSI-ASME NQA-1. The prime responsibility for Operational Quality Assurance rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Scientific Advisor and the Management and Operating Contractor. Overviews of selected operational and testing activities will be are conducted in accordance with prescribed requirements and that adequate documentation of these activities is maintained. 4 figs

  7. Projection-operator calculations of the lowest e--He resonance

    Berk, A.; Bhatia, A.K.; Junker, B.R.; Temkin, A.

    1986-01-01

    Results for the lowest (Schulz) autodetaching state of He - [1s(2s) 2 ] are reported. The calculation utilizes the full projection-operator formalism as explicitly developed by Temkin and Bhatia [Phys. Rev. A 31, 1259 (1985)]. Eigenvalues, scrE = , are calculated using projection operators Q depending on increasingly elaborate target wave functions going up to a 10-term Hylleraas-form, and a configuration-interaction total wave function Phi of 40 configurations. Results are well converged, but our best value is --0.13 eV above the experimental position at 19.37 eV. We conclude that the shift (Δ) in the Feshbach formalism gives a large contribution (relative to the width) to the position E/sub r/ ( = scrE+Δ). An appendix is devoted to the evaluation of the most complicated type of three-center integral involved in the calculation

  8. Using Web 2.0 Techniques in NASA's Ares Engineering Operations Network (AEON) Environment - First Impressions

    Scott, David W.

    2010-01-01

    The Mission Operations Laboratory (MOL) at Marshall Space Flight Center (MSFC) is responsible for Engineering Support capability for NASA s Ares rocket development and operations. In pursuit of this, MOL is building the Ares Engineering and Operations Network (AEON), a web-based portal to support and simplify two critical activities: Access and analyze Ares manufacturing, test, and flight performance data, with access to Shuttle data for comparison Establish and maintain collaborative communities within the Ares teams/subteams and with other projects, e.g., Space Shuttle, International Space Station (ISS). AEON seeks to provide a seamless interface to a) locally developed engineering applications and b) a Commercial-Off-The-Shelf (COTS) collaborative environment that includes Web 2.0 capabilities, e.g., blogging, wikis, and social networking. This paper discusses how Web 2.0 might be applied to the typically conservative engineering support arena, based on feedback from Integration, Verification, and Validation (IV&V) testing and on searching for their use in similar environments.

  9. Asian regional co-operative project on food irradiation: Technology transfer

    1992-01-01

    These Proceedings include the final reports of work performed by different institutions under the scope of Phase II of the Asian Regional Co-operative Project on Food Irradiation. The topics covered include the disinfestation and decontamination of stored products; improvements in the hygiene of processed seafood; insect disinfestation of fruits; and sprout inhibition of root crops. The individual presentations are indexed separately. Refs, figs and tabs

  10. Global Dynamical Systems Involving Generalized -Projection Operators and Set-Valued Perturbation in Banach Spaces

    Yun-zhi Zou

    2012-01-01

    Full Text Available A new class of generalized dynamical systems involving generalized f-projection operators is introduced and studied in Banach spaces. By using the fixed-point theorem due to Nadler, the equilibrium points set of this class of generalized global dynamical systems is proved to be nonempty and closed under some suitable conditions. Moreover, the solutions set of the systems with set-valued perturbation is showed to be continuous with respect to the initial value.

  11. Human error analysis project (HEAP) - The fourth pilot study: verbal data for analysis of operator performance

    Braarud, Per Oeyvind; Droeyvoldsmo, Asgeir; Hollnagel, Erik

    1997-06-01

    This report is the second report from the Pilot study No. 4 within the Human Error Analyses Project (HEAP). The overall objective of HEAP is to provide a better understanding and explicit modelling of how and why ''cognitive errors'' occur. This study investigated the contribution from different verbal data sources for analysis of control room operator's performance. Operator's concurrent verbal report, retrospective verbal report, and process expert's comments were compared for their contribution to an operator performance measure. This study looked into verbal protocols for single operator and for team. The main findings of the study were that all the three verbal data sources could be used to study performance. There was a relative high overlap between the data sources, but also a unique contribution from each source. There was a common pattern in the types of operator activities the data sources gave information about. The operator's concurrent protocol overall contained slightly more information on the operator's activities than the other two verbal sources. The study also showed that concurrent verbal protocol is feasible and useful for analysis of team's activities during a scenario. (author)

  12. Operational Research Techniques Used for Addressing Biodiversity Objectives into Forest Management: An Overview

    Marta Ezquerro

    2016-10-01

    Full Text Available The integration of biodiversity into forest management has traditionally been a challenge for many researchers and practitioners. In this paper, we have provided a survey of forest management papers that use different Operations Research (OR methods in order to integrate biodiversity objectives into their planning models. One hundred and seventy-nine references appearing in the ISI Web of Science database in the last 30 years have been categorized and evaluated according to different attributes like model components, forest management elements, or biodiversity issues. The results show that many OR methods have been applied to deal with this challenging objective. Thus, up to 18 OR techniques, divided into four large groups, which have been employed in four or more articles, have been identified. However, it has been observed how the evolution of these papers in time apparently tended to increase only until 2008. Finally, two clear trends in this set of papers should be highlighted: the incorporation of spatial analysis tools into these operational research models and, second, the setting up of hybrid models, which combine different techniques to solve this type of problem.

  13. Design techniques for a stable operation of cryogenic field-programmable gate arrays

    Homulle, Harald; Visser, Stefan; Patra, Bishnu; Charbon, Edoardo

    2018-01-01

    In this paper, we show how a deep-submicron field-programmable gate array (FPGA) can be operated more stably at extremely low temperatures through special firmware design techniques. Stability at low temperatures is limited through long power supply wires and reduced performance of various printed circuit board components commonly employed at room temperature. Extensive characterization of these components shows that the majority of decoupling capacitor types and voltage regulators are not well behaved at cryogenic temperatures, asking for an ad hoc solution to stabilize the FPGA supply voltage, especially for sensitive applications. Therefore, we have designed a firmware that enforces a constant power consumption, so as to stabilize the supply voltage in the interior of the FPGA. The FPGA is powered with a supply at several meters distance, causing significant resistive voltage drop and thus fluctuations on the local supply voltage. To achieve the stabilization, the variation in digital logic speed, which directly corresponds to changes in supply voltage, is constantly measured and corrected for through a tunable oscillator farm, implemented on the FPGA. The impact of the stabilization technique is demonstrated together with a reconfigurable analog-to-digital converter (ADC), completely implemented in the FPGA fabric and operating at 15 K. The ADC performance can be improved by at most 1.5 bits (effective number of bits) thanks to the more stable supply voltage. The method is versatile and robust, enabling seamless porting to other FPGA families and configurations.

  14. The Intra Uterine Morcellator: a new hysteroscopic operating technique to remove intrauterine polyps and myomas.

    Emanuel, Mark Hans; Wamsteker, Kees

    2005-01-01

    A new hysteroscopic operating technique was compared retrospectively with conventional resectoscopy. Retrospective comparison (Canadian Task Force Classification II-2). Gynecology department of a university-affiliated teaching hospital. Fifty-five women, 27 with endometrial polyps and 28 with submucous myomas. Patients were treated with a prototype of the Intra Uterine Morcellator (IUM). This cutting device, 35 cm in length, was inserted into a straight working channel of a 90-mm hysteroscope. The major advantages were ease of removal of tissue fragments through the instrument and the use of saline solution instead of electrolyte-free solutions used in monopolar high-frequency resectoscopy. The mean operating time was 8.7 minutes (95% CI: 7.3-10.1) for the removal of endometrial polyps compared with 30.9 minutes (CI: 27.0-34.8) for resectoscopy, and 16.4 minutes (CI: 12.6-20.2) for submucous myomas compared with 42.2 minutes (CI: 39.7-44.7) for resectoscopy. All procedures were uneventful. This new technique is faster, and it appears to be easier to perform. Therefore, it can be expected to result in fewer fluid-related complications and to lead to a shorter learning curve when compared with conventional resectoscopy.

  15. Natural gas distribution operation and maintenance dissemination project Kaunas City, Lithuania. Final report

    NONE

    2000-03-01

    The main objective of this project has been to disseminate the results and experiences achieved during the former projects in Kaunas to other Lithuanian gas companies and the gas sector in general. Also new subjects selected in co-operation with Kaunas Gas Company, the Lithuanian Energy Institute and the Lithuanian Gas Training Centre, where improvements were required, have been implemented. The components of the project were the following: (1) A training course in cathodic protection. One course concerning measuring and registration and one course concerning design and implementation. (2) A pilot project to develop methods for measuring cathodic protection on coherent steel pipe network. (3) Analysis of gas losses related to types of gas meters and calibration of meters. (4) A training course and technology transfer concerning relations between gas companies and consumers. (5) Dissemination of the experience of 1998 from the preparation of an operation and maintenance manual for Kaunas Gas Company. Dissemination of the ideas to other Lithuanian gas companies. (EHS)

  16. Optimizing the design and operation of reactor emergency systems using reliability analysis techniques

    Snaith, E.R.

    1975-01-01

    Following a reactor trip various reactor emergency systems, e.g. essential power supplies, emergency core cooling and boiler feed water arrangements are required to operate with a high degree of reliability. These systems must therefore be critically assessed to confirm their capability of operation and determine their reliability of performance. The use of probability analysis techniques enables the potential operating reliability of the systems to be calculated and this can then be compared with the overall reliability requirements. However, a system reliability analysis does much more than calculate an overall reliability value for the system. It establishes the reliability of all parts of the system and thus identifies the most sensitive areas of unreliability. This indicates the areas where any required improvements should be made and enables the overall systems' designs and modes of operation to be optimized, to meet the system and hence the overall reactor safety criteria. This paper gives specific examples of sensitive areas of unreliability that were identified as a result of a reliability analysis that was carried out on a reactor emergency core cooling system. Details are given of modifications to design and operation that were implemented with a resulting improvement in reliability of various reactor sub-systems. The report concludes that an initial calculation of system reliability should represent only the beginning of continuing process of system assessment. Data on equipment and system performance, particularly in those areas shown to be sensitive in their effect on the overall nuclear power plant reliability, should be collected and processed to give reliability data. These data should then be applied in further probabilistic analyses and the results correlated with the original analysis. This will demonstrate whether the required and the originally predicted system reliability is likely to be achieved, in the light of the actual history to date of

  17. How to generate spinor representations in any dimension in terms of projection and nilpotent operators

    Borstnik, N. Mankoc; Nielsen, H.B.

    2002-01-01

    We present a technique to construct a spinor space basis as products of certain nilpotents and projections formed from γ a for which we only need to know that they obey the Clifford algebra. The technique works for all dimensions and signatures. We use this technique to deliver a concrete choice of γ-matrices and Lorentz group generators for (fundamental representations of) spinors in a rather systematic and transparent way. We further develop the formalism by proposing the corresponding graphic presentation of basic states, which offers an easy way to see all the quantum numbers of states with respect to the generators of the Lorentz group, as well as transformation properties of the states under any element of the Clifford algebra

  18. AN EVALUATION OF PHOTOVOLTAIC SYSTEMS MPPT TECHNIQUES UNDER THE CHARACTERISTICS OF OPERATIONAL CONDITIONS

    I. A. Elzein

    2017-01-01

    Full Text Available In this article an extended literature surveying review is launched on a set of comparative studies of maximum power point tracking (MPPT techniques. Different MPPT methods are addressed with an ultimate aim of how to be maximizing the PV system output power by tracking Pmax in a set of different operational circumstances. In this paper maximum power point tracking, MPPT techniques are reviewed on basis of different parameters related to the design simplicity and/or complexity, implementation, hardware required, and other related aspects.he technology of solar systems has been booming for a while due to its ability to replace current fossil fuels like coal and gas for generation of electricity that produce air, water, and land pollution. In addition it decreased the issue of global warming and climate changes substantially due to being produced in a clean environmental manner and was proved to be an Eco-friendly resource of energy. The photovoltaic systems’ manufacturing process has been improving continuously over the last decade and photovoltaic systems have become an interesting solution. Precisely, PV systems are constituted from arrays of photovoltaic cells, choppers (mainly buck-boost or boost DC/DC converter, MPPT control systems and storage devices and/or grid connections. To improve the efficiency of such systems, various studies have been performed. The demand of PV generation systems seems to be increased for both standalone and grid-connected modes of PV systems. Therefore, an efficient maximum power point tracking (MPPT technique is necessary to initialize the process of tracking the maximum power point MPP at all environmental conditions and then force the PV system to operate at that MPP point.

  19. Verification of the Monte Carlo differential operator technique for MCNP trademark

    McKinney, G.W.; Iverson, J.L.

    1996-02-01

    The differential operator perturbation technique has been incorporated into the Monte Carlo N-Particle transport code MCNP and will become a standard feature of future releases. This feature includes first and second order terms of the Taylor series expansion for response perturbations related to cross-section data (i.e., density, composition, etc.). Perturbation and sensitivity analyses can benefit from this technique in that predicted changes in one or more tally responses may be obtained for multiple perturbations in a single run. The user interface is intuitive, yet flexible enough to allow for changes in a specific microscopic cross section over a specified energy range. With this technique, a precise estimate of a small change in response is easily obtained, even when the standard deviation of the unperturbed tally is greater than the change. Furthermore, results presented in this report demonstrate that first and second order terms can offer acceptable accuracy, to within a few percent, for up to 20-30% changes in a response

  20. Real-time lossless data compression techniques for long-pulse operation

    Vega, J.; Ruiz, M.; Sanchez, E.; Pereira, A.; Portas, A.; Barrera, E.

    2007-01-01

    Data logging and data distribution will be two main tasks connected with data handling in ITER. Data logging refers to the recovery and ultimate storage of all data, independent of the data source. Data distribution is related, on the one hand, to the on-line data broadcasting for immediate data availability and, on the other hand, to the off-line data access. Due to the large data volume expected, data compression is a useful candidate to prevent the waste of resources in communication and storage systems. On-line data distribution in a long-pulse environment requires the use of a deterministic approach to be able to ensure a proper response time for data availability. However, an essential feature for all the above purposes is to apply lossless compression techniques. This article reviews different lossless data compression techniques based on delta compression. In addition, the concept of cyclic delta transformation is introduced. Furthermore, comparative results concerning compression rates on different databases (TJ-II and JET) and computation times for compression/decompression are shown. Finally, the validity and implementation of these techniques for long-pulse operation and real-time requirements is also discussed

  1. Real-time lossless data compression techniques for long-pulse operation

    Vega, J. [Asociacion EURATOM/CIEMAT para Fusion, Avda. Complutense 22, 28040 Madrid (Spain)], E-mail: jesus.vega@ciemat.es; Ruiz, M. [Dpto. de Sistemas Electronicos y de Control, UPM, Campus Sur. Ctra., Valencia km 7, 28031 Madrid (Spain); Sanchez, E.; Pereira, A.; Portas, A. [Asociacion EURATOM/CIEMAT para Fusion, Avda. Complutense 22, 28040 Madrid (Spain); Barrera, E. [Dpto. de Sistemas Electronicos y de Control, UPM, Campus Sur. Ctra., Valencia km 7, 28031 Madrid (Spain)

    2007-10-15

    Data logging and data distribution will be two main tasks connected with data handling in ITER. Data logging refers to the recovery and ultimate storage of all data, independent of the data source. Data distribution is related, on the one hand, to the on-line data broadcasting for immediate data availability and, on the other hand, to the off-line data access. Due to the large data volume expected, data compression is a useful candidate to prevent the waste of resources in communication and storage systems. On-line data distribution in a long-pulse environment requires the use of a deterministic approach to be able to ensure a proper response time for data availability. However, an essential feature for all the above purposes is to apply lossless compression techniques. This article reviews different lossless data compression techniques based on delta compression. In addition, the concept of cyclic delta transformation is introduced. Furthermore, comparative results concerning compression rates on different databases (TJ-II and JET) and computation times for compression/decompression are shown. Finally, the validity and implementation of these techniques for long-pulse operation and real-time requirements is also discussed.

  2. Operative technique and early experience for robotic-assisted laparoscopic nephroureterectomy (RALNU) using da Vinci Xi.

    Darwiche, Fadi; Swain, Sanjaya; Kallingal, George; Punnen, Sanoj; Manoharan, Murugesan; Parekh, Dipen J; Gonzalgo, Mark L

    2015-01-01

    Robotic-assisted laparoscopic nephroureterectomy (RALNU) has been previously utilized for management of upper tract urothelial carcinoma. The da Vinci Xi surgical system was released in April of 2014. We describe our operative technique and early experience for RALNU using the da Vinci Xi system highlighting unique features of this surgical platform. A total of 10 patients with a diagnosis of upper tract urothelial carcinoma underwent RALNU using the da Vinci Xi system between April and November of 2014. A novel, oblique "in line" robotic trocar configuration was utilized to access the upper abdomen (nephrectomy portion) and pelvis (bladder cuff excision) without undocking. The port hopping feature of da Vinci Xi was utilized to facilitate optimal, multi-quadrant visualization during RALNU. Robotic-assisted laparoscopic nephroureterectomy was successfully completed without open conversion in all 10 patients. Mean operative time was 184 min (range 140-300 min), mean estimated blood loss was 121 cc (range 60-300 cc), and mean hospital stay was 2.4 days. Final pathology demonstrated high grade urothelial carcinoma in all patients. Surgical margins were negative in all patients. No intra-operative complications were encountered. One patient developed a pulmonary embolus after being discharged. No patients required a blood transfusion. Mean patient follow-up was 130 days (range 15-210 days). The use of da Vinci Xi with a novel, oblique "in line" port configuration and camera port hopping technique allows for an efficient and reproducible method for RALNU without the need for repositioning the patient or the robot during surgery.

  3. Use of hands-free technique among operating room nurses in the Republic of Korea.

    Jeong, Ihn Sook; Park, Sunmi

    2009-03-01

    The recently introduced concept of hands-free technique (HFT) currently has no recommendations or formal educational program for use in the Republic of Korea. This study evaluated the level of HFT use and investigated factors related to HFT use among Korean operating room nurses. Data were obtained through a self-administered questionnaire from 158 operating room nurses in 7 general hospitals in Busan, Republic of Korea, in April and May 2006. The questionnaire elicited information on demographics, exposure to education on HFT, attitude toward the need for HFT, concerns about exposure to bloodborne pathogens, and experience with HTF use. Multilevel multiple logistic regression analysis with generalized estimating equations was used, and adjusted odds ratios (ORs) and their 95% confidence intervals (CIs) were calculated. We found that 56% of the participants had used HFT, and 50% had received education on HFT. The use of HFT had a significant association with both education on HFT (OR = 12.02; 95% CI = 7.50 to 19.25) and attitude toward the need for HFT (OR = 4.22; 95% CI = 2.43 to 7.35). Increasing education about HFT could be the most important approach to increasing the use of HFT among Korean operating room nurses. Thus, routine teaching about HFT should be provided to these nurses.

  4. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  5. The energy sector in Northeast Asia : new projects, delivery systems and prospects for co-operation

    Ivanov, V.I.

    2000-01-01

    This study examines the needs and opportunities for energy co-operation in Northeast Asia, with particular reference to development of resources in eastern Russia, Siberia and the Far East to supply energy to consumers in Northeast Asia. Given the high projected demand for energy resources, Japan, South Korea and China are compelled to consider diversifying their energy supplies and developing new links with eastern Russia. The environmental degradation caused by coal burning in China is another incentive for looking for sources of natural gas in Eurasia. Russia and Japan are concentrating on the Sakhalin oil and gas projects. China and Russia have agreed to work closely in the energy sector, focusing on a pipeline from the natural gas field near Irkutsk. The challenges lies in developing a co-ordinated approach to energy resource development and use, by modifying energy policies and long-term supply outlooks. Another challenge lies in the fact that private investors and intergovernmental co-operation are required to build an expensive cross-border infrastructure to transport natural gas, electricity and oil. Co-operation is also required to improve energy efficiency, modernize existing facilities and promote cleaner sources of energy, energy conservation and environmental protection. This report examined forecasted energy demand and imports in Northeast Asia and identified opportunities for co-operation. refs., tabs

  6. SEU blending project, concept to commercial operation, Part 4: engineering design

    Ingalls, D.G.; Ioffe, M.S.; Oliver, A.J.; Smith, T.P.; Ozberk, E.

    2005-01-01

    The process development test program for production of Slightly Enriched Uranium (SEU) dioxide powder and Blend of Dysprosium and Uranium (BDU) oxide powder was initiated almost simultaneously with the conceptual engineering study for the commercial plant in 2001. During the very early phases of the project it was recognized that meeting the challenging requirements would necessitate wide expertise from different departments within the Cameco operations as well as consultants from outside the Company. The project team formed reflected this recognition. The conceptual engineering study was the lead into preparation of the engineering design study in 2003, which provided the process description based on the research and development program being carried out at Cameco Technology Development (CTD), project description, and project cost estimates. The detailed engineering phase commenced in June 2004 and was in progress at the the time when this paper was presented. The detailed engineering phase is addressing all aspects of the commercial plant including all health and safety, environment and security related issues, nuclear safety, training program, all product quality assurance issues, quality management issues, powder and fuel bundle transportation issues, all regulatory requirements, establishing project execution plans and budget, and strategies to control the costs. At the end of the detailed engineering phase, construction packages will be ready for tender, and major pieces of equipment will be selected and procured. (author)

  7. Construction of spaces of kinematic quantum states for field theories via projective techniques

    Okołów, Andrzej

    2013-01-01

    We present a method of constructing a space of quantum states for a field theory: given phase space of a theory, we define a family of physical systems each possessing a finite number of degrees of freedom, next we define a space of quantum states for each finite system, finally using projective techniques we organize all these spaces into a space of quantum states which corresponds to the original phase space. This construction is kinematic in this sense that it bases merely on the structure of the phase space of a theory and does not take into account possible constraints on the space. The construction is a generalization of a construction by Kijowski—the latter one is limited to theories of linear phase spaces, while the former one is free of this limitation. The method presented in this paper enables to construct a space of quantum states for the teleparallel equivalent of general relativity. (paper)

  8. Innovative characterization techniques and decision support systems for ground water contamination projects

    Hoffman, F.

    1992-07-01

    Ground water contamination projects throughout the world must be approached as individual and unique problems. Many traditional investigation techniques require modification to meet the needs of site-specific situations. Because the age of the science of contaminant hydrogeology can be measured only in a few decades, the field is ripe for innovation. This paper describes the following new technologies: At Lawrence Livermore National Laboratory (LLNL), we have developed a new drilling and sampling method, which allows the evaluation of the vertical extent of contamination in a single borehole. We are also using new fiber-optic-based chemical analytical sensors that promise to greatly increase the case of obtaining chemical analyses in the subsurface while greatly reducing costs. Because ground water investigations are data intensive, we need the best decision support system information tools to proceed with investigation and cleanup. These tools have three components: a relational database, data analysis tools, and tools for data display

  9. Technical data for concentrated solar power plants in operation, under construction and in project

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  10. Operating experience during high-level waste vitrification at the West Valley Demonstration Project

    Valenti, P.J.; Elliott, D.I.

    1999-01-01

    This report provides a summary of operational experiences, component and system performance, and lessons learned associated with the operation of the Vitrification Facility (VF) at the West Valley Demonstration Project (WVDP). The VF was designed to convert stored high-level radioactive waste (HLW) into a stable waste form (borosilicate glass) suitable for disposal in a federal repository. Following successful completion on nonradioactive test, HLW processing began in July 1995. Completion of Phase 1 of HLW processing was reached on 10 June 1998 and represented the processing of 9.32 million curies of cesium-137 (Cs-137) and strontium-90 (Sr-90) to fill 211 canisters with over 436,000 kilograms of glass. With approximately 85% of the total estimated curie content removed from underground waste storage tanks during Phase 1, subsequent operations will focus on removal of tank heel wastes

  11. Integration of health physics, safety and operational processes for management and disposition of recycled uranium wastes at the Fernald Environmental Management Project (FEMP)

    Barber, James; Buckley, James

    2003-01-01

    Fluor Fernald, Inc. (Fluor Fernald), the contractor for the U. S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP), recently submitted a new baseline plan for achieving site closure by the end of calendar year 2006. This plan was submitted at DOE's request, as the FEMP was selected as one of the sites for their accelerated closure initiative. In accordance with the accelerated baseline, the FEMP Waste Management Project (WMP) is actively evaluating innovative processes for the management and disposition of low-level uranium, fissile material, and thorium, all of which have been classified as waste. These activities are being conducted by the Low Level Waste (LLW) and Uranium Waste Disposition (UWD) projects. Alternatives associated with operational processing of individual waste streams, each of which poses potentially unique health physics, industrial hygiene and industrial hazards, are being evaluated for determination of the most cost effective and safe met hod for handling and disposition. Low-level Mixed Waste (LLMW) projects are not addressed in this paper. This paper summarizes historical uranium recycling programs and resultant trace quantity contamination of uranium waste streams with radionuclides, other than uranium. The presentation then describes how waste characterization data is reviewed for radiological and/or chemical hazards and exposure mitigation techniques, in conjunction with proposed operations for handling and disposition. The final part of the presentation consists of an overview of recent operations within LLW and UWD project dispositions, which have been safely completed, and a description of several current operations

  12. Application of flow-induced vibration predictive techniques to operating steam generators

    Sauve, R.G.; Tabatabai, M.; Morandin, G.; Kozluk, M.J.

    1998-01-01

    Analytical techniques for flow-induced vibration (FIV), such as those incorporated in available design tools, are routinely applied to process equipment at the initial design stage. Unfortunately, this does not always apply to the situation when problems, related to FIV, develop in crucial operating equipment, since design uses conservative methods, whereas in-service applications require more realistic assessments. Usually these problems appear in the form of severe through wall fret flaws or fatigue cracks that compromise the integrity of the tubes and possibly the complete unit. It is here where a somewhat different approach must be taken in the evaluation of tube response to FIV. Tube damage from fretting wear or fatigue crack growth must be estimated from actual in situ operating conditions. In this paper, an overview of the predictive methods used in the development and/or qualification of remedial measures for problems that occur in operating process equipment along with applications are described. The steps in the evaluation procedure, from the prediction of flow regimes, the development of the nonlinear computer models and associated fluid forcing functions through to the estimates of tube damage in operating heat exchangers and steam generators are presented. A probabilistic (i.e. Monte Carlo simulation) FIV approach that readily accommodates uncertainties associated with damage predictions is summarized. The efficacy of this approach comes from the fact that probabilistic methods facilitate the incorporation of field data, and that a large number of tubes and possible variations in geometry, process and support conditions, usually present in such equipment, can be addressed effectively. (author)

  13. Application techniques of coatings by thermal projection; Tecnicas de aplicacion de recubrimientos por proyeccion termica

    Porcayo Calderon, Jesus [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1995-12-31

    The coatings applied by thermal projection have an important number of applications in different industries (chemical, oil, electric, nuclear, etc.). The main purpose of the protection by means of coatings is to alter the surface characteristics of a component so as to resist corrosive environments, abrasion and erosion, among others. The coatings can be applied by different methods, but due to the fact that its characteristics appreciably differ from the base metal, it is important the knowledge of its properties when a coating is selected for a specific use. In this article the characteristics of the applied coatings by thermal projection, the factors that affect its performance and the principal application techniques, are described. [Espanol] Los recubrimientos aplicados por proyeccion termica tienen un numero importante de aplicaciones en diferentes industrias (quimica, petrolera, electrica, nuclear, etc.). El proposito principal de la proteccion por medio de recubrimientos es alterar las caracteristicas de la superficie de un componente de manera que resista ambientes corrosivos, abrasion y erosion, entre otros. Los recubrimientos pueden aplicarse por diferentes metodos, pero debido a que sus propiedades difieren apreciablemente de las del metal base, es importante el conocimiento de sus propiedades cuando se selecciona un recubrimiento para un uso especifico. En este articulo se describen las caracteristicas de los recubrimientos aplicados por proyeccion termica, los factores que afectan su desempeno y las principales tecnicas de aplicacion.

  14. Application techniques of coatings by thermal projection; Tecnicas de aplicacion de recubrimientos por proyeccion termica

    Porcayo Calderon, Jesus [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1996-12-31

    The coatings applied by thermal projection have an important number of applications in different industries (chemical, oil, electric, nuclear, etc.). The main purpose of the protection by means of coatings is to alter the surface characteristics of a component so as to resist corrosive environments, abrasion and erosion, among others. The coatings can be applied by different methods, but due to the fact that its characteristics appreciably differ from the base metal, it is important the knowledge of its properties when a coating is selected for a specific use. In this article the characteristics of the applied coatings by thermal projection, the factors that affect its performance and the principal application techniques, are described. [Espanol] Los recubrimientos aplicados por proyeccion termica tienen un numero importante de aplicaciones en diferentes industrias (quimica, petrolera, electrica, nuclear, etc.). El proposito principal de la proteccion por medio de recubrimientos es alterar las caracteristicas de la superficie de un componente de manera que resista ambientes corrosivos, abrasion y erosion, entre otros. Los recubrimientos pueden aplicarse por diferentes metodos, pero debido a que sus propiedades difieren apreciablemente de las del metal base, es importante el conocimiento de sus propiedades cuando se selecciona un recubrimiento para un uso especifico. En este articulo se describen las caracteristicas de los recubrimientos aplicados por proyeccion termica, los factores que afectan su desempeno y las principales tecnicas de aplicacion.

  15. A Novel Markerless Technique to Evaluate Daily Lung Tumor Motion Based on Conventional Cone-Beam CT Projection Data

    Yang Yin; Zhong Zichun; Guo Xiaohu; Wang Jing; Anderson, John; Solberg, Timothy; Mao Weihua

    2012-01-01

    Purpose: In this study, we present a novel markerless technique, based on cone beam computed tomography (CBCT) raw projection data, to evaluate lung tumor daily motion. Method and Materials: The markerless technique, which uses raw CBCT projection data and locates tumors directly on every projection, consists of three steps. First, the tumor contour on the planning CT is used to create digitally reconstructed radiographs (DRRs) at every projection angle. Two sets of DRRs are created: one showing only the tumor, and another with the complete anatomy without the tumor. Second, a rigid two-dimensional image registration is performed to register the DRR set without the tumor to the CBCT projections. After the registration, the projections are subtracted from the DRRs, resulting in a projection dataset containing primarily tumor. Finally, a second registration is performed between the subtracted projection and tumor-only DRR. The methodology was evaluated using a chest phantom containing a moving tumor, and retrospectively in 4 lung cancer patients treated by stereotactic body radiation therapy. Tumors detected on projection images were compared with those from three-dimensional (3D) and four-dimensional (4D) CBCT reconstruction results. Results: Results in both static and moving phantoms demonstrate that the accuracy is within 1 mm. The subsequent application to 22 sets of CBCT scan raw projection data of 4 lung cancer patients includes about 11,000 projections, with the detected tumor locations consistent with 3D and 4D CBCT reconstruction results. This technique reveals detailed lung tumor motion and provides additional information than conventional 4D images. Conclusion: This technique is capable of accurately characterizing lung tumor motion on a daily basis based on a conventional CBCT scan. It provides daily verification of the tumor motion to ensure that these motions are within prior estimation and covered by the treatment planning volume.

  16. Methods of projecting operations and maintenance costs for nuclear power plants

    1995-01-01

    Operations and maintenance cost (OMC) had increased its relative importance to the total generation cost for future nuclear power stations, according to the latest update of the OECD Nuclear Energy Agency (NEA) study on Projected Costs of Generating Electricity (EGC studies). OMC is some 20 to 30% of total generation cost for future nuclear power stations in most NEA member countries. However, nuclear OMC that countries projected in the latest EGC study are spread over a wide range, from 5 to 16 US mills/kWh. In order to understand better the reasons for this wide diversity in nuclear OMC projections, the NEA set up an Expert Group. The focus of this study was on projected OMC that were reported in the past EGC studies, but the Group studied actual OMC experienced from existing units, because knowledge or experience concerning actual OMC certainly influences the choice of assumptions or calculation procedure for estimating OMC for future plants. Cost informations from 14 NEA countries have been analysed on the basis of a standardized framework of detailed components of OMC costs. The rationale for different OMC cost projections reported in previous NEA studies on generation cost is discussed and suggestions are made for future studies on both generation cost and OMC cost. Despite the methodological approach and the reduced extent of differences when excluding exceptional figures, it was not possible fully to clarify the origins and to understand the remaining differences in OMC figures. Several countries which have a long and a good experience of operating nuclear units did not provide sufficient detailed data or did not provide any quantitative data at all. (J.S.). 14 refs., 5 figs., 19 tabs., 4 annexes

  17. The International Universities Walking Project: development of a framework for workplace intervention using the Delphi technique.

    Gilson, Nicholas; Brown, Wendy J; Faulkner, Guy; McKenna, Jim; Murphy, Marie; Pringle, Andy; Proper, Karin; Puig-Ribera, Anna; Stathi, Aphroditi

    2009-07-01

    This paper aimed to use the Delphi technique to develop a consensus framework for a multinational, workplace walking intervention. Ideas were gathered and ranked from eight recognized and emerging experts in the fields of physical activity and health, from universities in Australia, Canada, England, The Netherlands, Northern Ireland, and Spain. Members of the panel were asked to consider the key characteristics of a successful campus walking intervention. Consensus was reached by an inductive, content analytic approach, conducted through an anonymous, three-round, e-mail process. The resulting framework consisted of three interlinking themes defined as "design, implementation, and evaluation." Top-ranked subitems in these themes included the need to generate research capacity (design), to respond to group needs through different walking approaches (implementation), and to undertake physical activity assessment (evaluation). Themes were set within an underpinning domain, referred to as the "institution" and sites are currently engaging with subitems in this domain, to provide sustainable interventions that reflect the practicalities of local contexts and needs. Findings provide a unique framework for designing, implementing, and evaluating walking projects in universities and highlight the value of adopting the Delphi technique for planning international, multisite health initiatives.

  18. X-ray phase radiography and tomography with grating interferometry and the reverse projection technique

    Wang, Zhili; Gao, Kun; Ge, Xin; Wu, Zhao; Chen, Heng; Wang, Shenghao; Wu, Ziyu; Zhu, Peiping; Yuan, Qingxi; Huang, Wanxia; Zhang, Kai

    2013-01-01

    X-ray grating interferometry provides substantially increased contrast over conventional absorption-based imaging methods, and therefore new and complementary information. Compared with other phase-contrast imaging techniques, x-ray grating interferometry can overcome some of the problems that have impaired the applications of x-ray phase-contrast radiography and phase tomography. Recently, special attention has been paid to the development of quantitative phase retrieval methods, which is mandatory to perform x-ray phase tomography, to achieve material identification, to differentiate distinct tissues, etc. Typically, the phase-stepping approach has been utilized for phase retrieval in grating interferometry. This method requires a grating scanning and acquisition of multiple radiographic projections, and therefore is disadvantageous in terms of imaging speed and radiation damage. Here we present an innovative, highly sensitive approach, dubbed ‘reverse projection’ (RP), for quantitative phase retrieval. Compared with the phase-stepping approach, the present RP method abandons grating scanning completely, and thus is advantageous due to its much higher efficiency and the reduced radiation dose, without the degradation of reconstruction quality. This review presents a detailed explanation of the principle of the RP method. Both radiography and phase tomography experiments are performed to validate the RP method. We believe that this new technique will find widespread applications in biomedical imaging and in vivo studies. (paper)

  19. Operation and maintenance techniques of 1 ton bucket elevator in IMEF

    Soong, Woong Sup

    1999-04-01

    IMEF pool is used as a pathway between pool and hot cell in order to transfer (incoming and outgoing) irradiated materials. Transfer is performed by 1 ton bucket elevator which is moved inside the rectangular tube installed between pool and M1 hot cell. Allowable load capacity is 1 ton of the bucket elevator and its size is 25 X 25 X 150 cm. Bucket is driven by chain system which is moved up and down through the guide rail. Guide rail is installed in rectangular tube that is tilted about 63 degree. Chain which is moved by using the roller sliding method is driven by sprocket wheel being rotated by the shaft and the shaft is driven by gear reducing motor. In this report operation and maintenance techniques of 1 ton bucket elevator in IMEF are described in detail. (Author). 8 refs., 14 tabs., 6 figs

  20. Operation and maintenance techniques of 1 ton bucket elevator in IMEF

    Soong, Woong Sup

    1999-04-01

    IMEF pool is used as a pathway between pool and hot cell in order to transfer (incoming and outgoing) irradiated materials. Transfer is performed by 1 ton bucket elevator which is moved inside the rectangular tube installed between pool and M1 hot cell. Allowable load capacity is 1 ton of the bucket elevator and its size is 25 X 25 X 150 cm. Bucket is driven by chain system which is moved up and down through the guide rail. Guide rail is installed in rectangular tube that is tilted about 63 degree. Chain which is moved by using the roller sliding method is driven by sprocket wheel being rotated by the shaft and the shaft is driven by gear reducing motor. In this report operation and maintenance techniques of 1 ton bucket elevator in IMEF are described in detail. (Author). 8 refs., 14 tabs., 6 figs.

  1. Meteorological requirements and operational fallout prediction techniques for Plowshare nuclear detonations

    Mueller, H.F.

    1969-01-01

    Meteorological support requirements for Plowshare nuclear detonations are shown to depend on a number of factors. The importance of adequate support to the effective planning and safe conduct of a nuclear detonation is described. An example of the influence of atmospheric conditions on radioactive cloud development and local transport and fallout of radioactive debris is presented. Prediction of the future state of atmospheric wind structure, required for fallout predictions depends on an adequate definition of its initial state and its rate of change. This definition, in turn, is shown to depend on an upper wind-sounding network of appropriate station density. An operational technique currently used for nuclear cratering fallout predictions is described and shown to produce results of useful accuracy. (author)

  2. Meteorological requirements and operational fallout prediction techniques for Plowshare nuclear detonations

    Mueller, H F [Air Resources Laboratory, Environmental Science Services Administration, Las Vegas, NV (United States)

    1969-07-01

    Meteorological support requirements for Plowshare nuclear detonations are shown to depend on a number of factors. The importance of adequate support to the effective planning and safe conduct of a nuclear detonation is described. An example of the influence of atmospheric conditions on radioactive cloud development and local transport and fallout of radioactive debris is presented. Prediction of the future state of atmospheric wind structure, required for fallout predictions depends on an adequate definition of its initial state and its rate of change. This definition, in turn, is shown to depend on an upper wind-sounding network of appropriate station density. An operational technique currently used for nuclear cratering fallout predictions is described and shown to produce results of useful accuracy. (author)

  3. Effective field theory with differential operator technique for dynamic phase transition in ferromagnetic Ising model

    Kinoshita, Takehiro; Fujiyama, Shinya; Idogaki, Toshihiro; Tokita, Masahiko

    2009-01-01

    The non-equilibrium phase transition in a ferromagnetic Ising model is investigated by use of a new type of effective field theory (EFT) which correctly accounts for all the single-site kinematic relations by differential operator technique. In the presence of a time dependent oscillating external field, with decrease of the temperature the system undergoes a dynamic phase transition, which is characterized by the period averaged magnetization Q, from a dynamically disordered state Q = 0 to the dynamically ordered state Q ≠ 0. The results of the dynamic phase transition point T c determined from the behavior of the dynamic magnetization and the Liapunov exponent provided by EFT are improved than that of the standard mean field theory (MFT), especially for the one dimensional lattice where the standard MFT gives incorrect result of T c = 0 even in the case of zero external field.

  4. Water balance and fertigation for crop improvement in West Asia. Results of a technical co-operation project

    2002-01-01

    Mediterranean countries have a severe shortage of water resources for agricultural, municipal and industrial purposes. This situation is aggravated daily due to the rapidly increasing population in the area. Agriculture is the biggest consumer of water with about 80% of the renewable resource used for irrigation. Traditional irrigation methods are highly inefficient: only about one-third of the applied water is actually transpired by the crops. Clearly, there is great scope for improved irrigation management. Intensification of agricultural production to meet growing market demand requires the simultaneous application of irrigation water and fertilizers. Application of fertilizer in drip irrigation (fertigation) is an effective way to promote efficient use of these scarce and expensive resources. There is widespread interest in Mediterranean countries in fertigation. Nevertheless, information on the form and concentration of the nutrients required for different crops is presently inadequate. Moreover, the low fertilizer recoveries due to extensive fertilization practiced during the last few decades have created serious agricultural and environmental problems. High nitrate concentrations in groundwater and deterioration of some important quality parameters of agricultural products are the main concerns. Recognizing the potential role of nuclear techniques in identifying improved water and fertilizer management practices, the IAEA implemented two regional technical co-operation projects during the period 1995-2000 with eight participating countries from the West Asia region: The Islamic Republic of Iran, Jordan, Lebanon, Saudi Arabia, the Syria Arab Republic, Turkey, United Arab Emirates and Yemen. The main objective was to establish water balance and fertigation practices using nuclear techniques, with a view to improving crop production in arid and semi-arid zones. The projects aimed to compare the following parameters under conventional fertilizer and water

  5. Real-time lossless data compression techniques for long-pulse operation

    Jesus Vega, J.; Sanchez, E.; Portas, A.; Pereira, A.; Ruiz, M.

    2006-01-01

    databases (TJ-II and JET) and computation times for compression/decompression are shown. Finally, the validity and implementation of these techniques for long pulse operation and real-time requirements is also discussed. (author)

  6. Technical and scientific report of the Alto project; Rapport scientifique et technique du projet ALTO

    Essabaa, S.; Gardes, D.; Grialou, D.; Ibrahim, F.; Le Scornet, J.C

    2002-07-01

    The Alto project means the installation of an electron linear accelerator inside the experimental area of the tandem accelerator of the nuclear physics institute of Orsay (IPNO, France). This linear accelerator comes from CERN where it was operating as a pre-injector for LEP. This equipment will allow IPNO'teams to perform fast kinetics studies in a domain different from that of ELYSE accelerator. The time resolution will not be as high as that of ELYSE (picosecond) but will be sufficient (microsecond) to produce free radicals in aqueous and gaseous media. The main expectations of this installation can be classified according 3 axis: 1) basic research (mainly the study of nuclear matter through photo-fission, 2) research and development of accelerators (by providing a test bench for new high frequency systems and superconducting components), and 3) applied research for industry concerning: biochemistry under irradiation, radiation sensibility, DNA breaking, food and drug sterilization and behaviour of electronic components under irradiation. This rapport details the research program that could be achieved with this equipment, describes its contributions in terms of economic development, cooperation with industry, student training, and specifies the needed investment and the operating and maintenance costs. (A.C.)

  7. Georgia resource assessment project: Institutionalizing LANDSAT and geographic data base techniques

    Pierce, R. R.; Rado, B. Q.; Faust, N.

    1981-01-01

    Digital data from LANDSAT for each 1.1-acre cell in Georgia were processed and the land cover conditions were categorized. Several test cases were completed and an operational hardware and software processing capability was established at the Georgia Institute of Technology. The operational capability was developed to process the entire state (60,000 sq. miles and 14 LANDSAT scenes) in a cooperative project between eleven divisions and agencies at the regional, state, and federal levels. Products were developed for State agencies such as in both mapped and statistical formats. A computerized geographical data base was developed for management programs. To a large extent the applications of the data base evolved as users of LANDSAT information requested that other data (i.e., soils, slope, land use, etc.) be made compatible with LANDSAT for management programs. To date, geographic data bases incorporating LANDSAT and other spatial data deal with elements of the municipal solid waste management program, and reservoir management for the Corps of Engineers. LANDSAT data are also being used for applications in wetland, wildlife, and forestry management.

  8. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  9. Operational Space-Assisted Irrigation Advisory Services: Overview Of And Lessons Learned From The Project DEMETER

    Osann Jochum, M. A.; Demeter Partners

    2006-08-01

    The project DEMETER (DEMonstration of Earth observation TEchnologies in Routine irrigation advisory services) was dedicated to assessing and demonstrating improvements introduced by Earth observation (EO) and Information and Communication Technologies (ICT) in farm and Irrigation Advisory Service (IAS) day-to-day operations. The DEMETER concept of near-real-time delivery of EO-based irrigation scheduling information to IAS and farmers has proven to be valid. The operationality of the space segment was demonstrated for Landsat 5-TM in the Barrax pilot zone during the 2004 and 2005 irrigation campaigns. Extra-fast image delivery and quality controlled operational processing make the EO-based crop coefficient maps available at the same speed and quality as ground-based data (point samples), while significantly extending the spatial coverage and reducing service cost. Leading-edge online analysis and visualization tools provide easy, intuitive access to the information and personalized service to users. First feedback of users at IAS and farmer level is encouraging. The paper gives an overview of the project and its main achievements.

  10. Study of fast operating readout electronics and charge interpolation technique for micro cathode strip chambers (MCSC)

    Kashchuk, A; Sagidova, Nailia

    1998-01-01

    Study of the factors limiting the spatial resolution of the MCSC caused by nonlinearity of the cathode-charge interpolation technique has been carried out using a special test arrangement that imitates the charge distribution on the cathode strips as a real MCSC and allows high precision comparison of the coordinates determined by the charge interpolation technique with the known values. We considered a MCSC with a 0.6 mm gap between the anode and the cathode strip planes and with the strip pitch of 0.9 mm. Various charge interpolation algorithms have been tested. It was demonstrated that the systematics errors in the coordinate measurements as low as 5 microns can be achieved, after applying some simple corrections, even with rather coarse sampling, when the coordinates is determined only by 2 or 3 adjacent strips. These results have been obtained with the readout electronics specially designed for fast operation of the MCSCs with the signal peaking time of 20 ns. The equivalent noise charge ss 1600e (r.m.s....

  11. Experience of molecular monitoring techniques in upstream oil and gas operations

    Mitchell, Anthony F.; Anfindsen, Hilde; Liengen, Turid; Molid, Solfrid [Statoil ASA (Denmark)

    2011-07-01

    For a numbers of years, molecular monitoring tools have been used in upstream oil and gas operations but the results have given only limited added value. This paper discusses the various techniques available for upstream molecular monitoring which provides scope for identification of microbial influenced problems. The methodology, which consists of analyzing solid samples using traditional as well as molecular techniques, is detailed. Two cases were studied with the objective of determining if microbial contamination was contributing to the problem. The first case was a study of amorphous deposits in production wells and mainly iron sulphide was found. The second study was of amorphous deposits in water injection wells and the analysis showed typical components of drilling and completion fluids with some organic material. Two more cases, corrosion of tubing in a water injection well and flow line corrosion, are discussed and the results are given. From the study, it can be concluded that failure can be due to several factors, chemical and biological.

  12. Project Milestone. Analysis of Range Extension Techniques for Battery Electric Vehicles

    Neubauer, Jeremy [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Wood, Eric [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Pesaran, Ahmad [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2013-07-01

    This report documents completion of the July 2013 milestone as part of NREL’s Vehicle Technologies Annual Operating Plan with the U.S. Department of Energy. The objective was to perform analysis on range extension techniques for battery electric vehicles (BEVs). This work represents a significant advancement over previous thru-life BEV analyses using NREL’s Battery Ownership Model, FastSim,* and DRIVE.* Herein, the ability of different charging infrastructure to increase achievable travel of BEVs in response to real-world, year-long travel histories is assessed. Effects of battery and cabin thermal response to local climate, battery degradation, and vehicle auxiliary loads are captured. The results reveal the conditions under which different public infrastructure options are most effective, and encourage continued study of fast charging and electric roadway scenarios.

  13. Achievements and advantages of participation in the IAEA project RER 002/004/1999-2001 'QA/QC of Nuclear Analytical Techniques'

    Vata, Ion; Cincu, Em.

    2002-01-01

    The National Institute for Physics and Engineering 'Horia Hulubei' (IFIN-HH) decided in the late 1990s to start applying nuclear techniques in economy and social life on a routine scale; reaching this goal implied achieving first-rate analytical performances and complying with the QA/QC requirements, as detailed in the ISO 17025. The IAEA Project appeared in 1999 as the best opportunity and tool for our specialists to become familiar with the standard requirements and begin to implement them in their operations, thus further enabling them to apply for accreditation according to the international criteria. This report outlines the experience gained from the participation in the project. The accomplishments of the project are presented and the main difficulties are identified

  14. Comparison of open and closed techniques of haemorrhoidectomy in terms of post-operative complications

    Majeed, S.; Qamar, S.R.; Tariq, M.; Ali, M.A.

    2015-01-01

    Haemorrhoids have been diagnosed and treated since the dawn of civilization, yet their cause, nature, symptomatology and especially their treatment options, remain hotly debated. The general principle however is that treatment should be directed by symptoms and the degree of haemorrhoids. The objective of the study is to compare early and late complications and wound healing time in open versus closed methods of haemorrhoidectomy. Methods: This was a Randomized control trial conducted at Department of Surgery CMH Kharian for a period of 3 years. During the period of study, patients presenting in Surgical OPD (Age Range 20-72 Years) with 3rd or 4th degree haemorrhoids requiring haemorrhoidectomy (n=364) were divided in two groups:- Group-1 was subjected to haemorrhoidectomy by open (Milligan-Morgan) technique and Group-2 underwent closed (Ferguson) haemorrhoidectomy. All patients were followed up for 2 months post-operatively and assessed for duration of wound healing and post-operative complications. Results: In group-1 (Open haemorrhoidectomy) patients ages ranged from 21-70 years with a mean age of 43 years (SD1±2.51). Duration of wound healing in this group was on the average 22 days (SD±5.76). Incidence of early post-operative complications including haemorrhage, infection and urinary retention was 4.94%, 8.24% and 7.14% respectively. The only late complication observed was anal stenosis in one patient (0.55%). No fissure or faecal incontinence was observed in this group. In group-2 (subjected to closed haemorrhoidectomy), patients ages ranged from 20-72 years with a mean age of 42 years (SD±10.31). Duration of wound healing was on the average 14 days (SD±3.25). Incidence of early post- operative complications, i.e., haemorrhage, infection and urinary retention was 2.19%, 7.69% and 2.75% respectively. No late complications (stenosis, fissure or incontinence) were observed in this group. Conclusion: There is no statistical significant difference between open

  15. Concepts, Operations, and Feasibility of a Projection-Based Variation Control System

    Stanciulescu, Stefan; Berger, Thorsten; Walkingshaw, Eric

    2016-01-01

    on a subset of all variants could ease the engineering of highly configurable software. We investigate the potential of one kind of such tools: projection-based variation control systems. For such systems we aim to understand: (i) what end-user operations they need to support, and (ii) whether they can...... realize the actual evolution of real-world, highly configurable software. We conduct an experiment that investigates variability-related evolution patterns and that evaluates the feasibility of a projection-based variation control system by replaying parts of the history of a highly configurable real......Highly configurable software often uses preproces- sor annotations to handle variability. However, understanding, maintaining, and evolving code with such annotations is difficult, mainly because a developer has to work with all variants at a time. Dedicated methods and tools that allow working...

  16. Projected metastable Markov processes and their estimation with observable operator models

    Wu, Hao; Prinz, Jan-Hendrik; Noé, Frank

    2015-01-01

    The determination of kinetics of high-dimensional dynamical systems, such as macromolecules, polymers, or spin systems, is a difficult and generally unsolved problem — both in simulation, where the optimal reaction coordinate(s) are generally unknown and are difficult to compute, and in experimental measurements, where only specific coordinates are observable. Markov models, or Markov state models, are widely used but suffer from the fact that the dynamics on a coarsely discretized state spaced are no longer Markovian, even if the dynamics in the full phase space are. The recently proposed projected Markov models (PMMs) are a formulation that provides a description of the kinetics on a low-dimensional projection without making the Markovianity assumption. However, as yet no general way of estimating PMMs from data has been available. Here, we show that the observed dynamics of a PMM can be exactly described by an observable operator model (OOM) and derive a PMM estimator based on the OOM learning

  17. The radioecological sensitivity of territories: towards an operational tool through the SENSIB Project

    Mercat-Rommens, C.; Roussel-Debet, S.; Briand, B.; Durand, V.; Besson, B.; Renaud, P.

    2007-01-01

    Radioecological sensitivity represents the intensity of a region's global reaction to an accidental or chronic radioactive pollution. The prospects for an operational application of this concept are investigated by I.R.S.N. within the framework of the S.E.N.S.I.B. project. The first aim of S.E.N.S.I.B. is to represent globally the territorial consequences of a situation of radioactive contamination, which requires to collect and to investigate the radioecological and contextual data. For this purpose, varied innovative methods of knowledge treatment are investigated. The second objective is to elaborate a management tool of this knowledge which could be shared by various stake holders (authorities, population, experts), and that is envisaged by the application of supporting methods to decision-making. The strategy, the preliminary results and the avenues of research of the project S.E.N.S.I.B. are briefly presented. (authors)

  18. Improving education and supervision of Queensland X-ray Operators through video conference technology: A teleradiography pilot project.

    Rawle, Marnie; Oliver, Tanya; Pighills, Alison; Lindsay, Daniel

    2017-12-01

    X-ray Operator (XO) supervision in Queensland is performed by radiographers in a site removed from the XO site. This has historically been performed by telephone when the XO requires immediate help, as well as post-examination through radiographer review and the provision of written feedback on images produced. This project aimed to improve image quality through the provision of real-time support of XOs by the introduction of video conference (VC) supervision. A 6-month pilot project compared image quality with and without VC supervision. VC equipment was installed in the X-ray room at two rural sites, as well as at the radiographer site, to enable visual and oral supervision. The VC unit enabled visualisation of the X-ray examination technique as it was being undertaken, as well as the images produced prior to transmission to the Picture Archiving and Communication System (PACS). Statistically significant improvement in image quality criteria measures were seen for patient positioning (P = 0.008), image quality (P < 0.001) and diagnostic value (P < 0.001) of images taken during this project. No statistically significant differences were seen during case level assessment in the inclusion of only appropriate imaging (P = 0.06), and the inclusion of unacceptable imaging (P = 0.06), however improvements were seen in both of these criteria. The survey revealed 24.6% of examinations performed would normally have involved the XO contacting the radiographer for assistance, although, assistance was actually provided in 88.3% of examinations. This project has demonstrated that significant improvement in image quality is achievable with VC supervision. A larger study with a control arm that did not receive direct supervision should be used to validate the findings of this study. © 2017 The Authors. Journal of Medical Radiation Sciences published by John Wiley & Sons Australia, Ltd on behalf of Australian Society of Medical Imaging and Radiation Therapy and New Zealand

  19. Characterization techniques for nano-electronics, with emphasis to electron microscopy. The role of the European Project ANNA

    Armigliato, A.

    2008-07-01

    , however, European laboratories with high-level expertise in materials characterization still operate in a largely independent way; this adversely affects the competitivity of European science and industry at the international level. For this reason the European Commission has started an Integrated Infrastructure Initiative (I3) in the sixth Framework Programme (now continuing in FP7) and funded a project called ANNA (2006-2010). This acronym stands for European Integrated Activity of Excellence and Networking for Nano and Micro- Electronics Analysis. The consortium includes 12 partners from 7 European countries and is coordinated by the Fondazione B.Kessler (FBK) in Trento (Italy); CNR-IMM is one of the 12 partners. Aim of ANNA is the onset of strong, long-term collaboration among the partners, so to form an integrated multi-site analytical facility, able to offer to the European community a wide variety of top-level analytical expertise and services in the field of micro- and nano-electronics. They include X-ray diffraction and scattering, SIMS, electron microscopy, medium-energy ion scattering, optical and electrical techniques. The project will be focused on three main activities: Networking (standardization of samples and methodologies, establishment of accredited reference laboratories), Transnational Access to laboratories located in the partners' premises to perform specific analytical experiments (an example is given by the two STEM methodologies discussed above) and Joint Research activity, which is targeted at the improvement and extension of the methodologies through a continuous instrumental and technical development. It is planned that the European joint analytical laboratory will continue its activity beyond the end of the project in 2010.

  20. CrossRef Optimizing charge breeding techniques for ISOL facilities in Europe: Conclusions from the EMILIE project

    Delahaye, P; Angot, J; Cam, J F; Traykov, E; Ban, G; Celona, L; Choinski, J; Gmaj, P; Jardin, P; Koivisto, H; Kolhinen, V; Lamy, T; Maunoury, L; Patti, G; Thuillier, T; Tarvainen, O; Vondrasek, R; Wenander, F

    2016-01-01

    The present paper summarizes the results obtained from the past few years in the framework of the Enhanced Multi-Ionization of short-Lived Isotopes for Eurisol (EMILIE) project. The EMILIE project aims at improving the charge breeding techniques with both Electron Cyclotron Resonance Ion Sources (ECRIS) and Electron Beam Ion Sources (EBISs) for European Radioactive Ion Beam (RIB) facilities. Within EMILIE, an original technique for debunching the beam from EBIS charge breeders is being developed, for making an optimal use of the capabilities of CW post-accelerators of the future facilities. Such a debunching technique should eventually resolve duty cycle and time structure issues which presently complicate the data-acquisition of experiments. The results of the first tests of this technique are reported here. In comparison with charge breeding with an EBIS, the ECRIS technique had lower performance in efficiency and attainable charge state for metallic ion beams and also suffered from issues related to beam c...

  1. Summary of operations and performance of the Murdock site restoration project in 2008.

    LaFreniere, L. M.; Environmental Science Division

    2009-06-04

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the third full year of system operation, from January 1 through December 31, 2008. Performance in June 2005 through December 2007 was reported previously (Argonne 2007, 2008). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A.

  2. Performance of the operational high-resolution numerical weather predictions of the Daphne project

    Tegoulias, Ioannis; Pytharoulis, Ioannis; Karacostas, Theodore; Kartsios, Stergios; Kotsopoulos, Stelios; Bampzelis, Dimitrios

    2015-04-01

    In the framework of the DAPHNE project, the Department of Meteorology and Climatology (http://meteo.geo.auth.gr) of the Aristotle University of Thessaloniki, Greece, utilizes the nonhydrostatic Weather Research and Forecasting model with the Advanced Research dynamic solver (WRF-ARW) in order to produce high-resolution weather forecasts over Thessaly in central Greece. The aim of the DAPHNE project is to tackle the problem of drought in this area by means of Weather Modification. Cloud seeding assists the convective clouds to produce rain more efficiently or reduce hailstone size in favour of raindrops. The most favourable conditions for such a weather modification program in Thessaly occur in the period from March to October when convective clouds are triggered more frequently. Three model domains, using 2-way telescoping nesting, cover: i) Europe, the Mediterranean sea and northern Africa (D01), ii) Greece (D02) and iii) the wider region of Thessaly (D03; at selected periods) at horizontal grid-spacings of 15km, 5km and 1km, respectively. This research work intents to describe the atmospheric model setup and analyse its performance during a selected period of the operational phase of the project. The statistical evaluation of the high-resolution operational forecasts is performed using surface observations, gridded fields and radar data. Well established point verification methods combined with novel object based upon these methods, provide in depth analysis of the model skill. Spatial characteristics are adequately captured but a variable time lag between forecast and observation is noted. Acknowledgments: This research work has been co-financed by the European Union (European Regional Development Fund) and Greek national funds, through the action "COOPERATION 2011: Partnerships of Production and Research Institutions in Focused Research and Technology Sectors" (contract number 11SYN_8_1088 - DAPHNE) in the framework of the operational programme "Competitiveness

  3. Nuclear Technology. Course 32: Nondestructive Examination (NDE) Techniques II. Module 32-4, Operation of Magnetic Particle Test Equipment.

    Groseclose, Richard

    This fourth in a series of six modules for a course titled Nondestructive Examination (NDE) Techniques II describes the specific technique variables and options which are available to the test technician, provides instructions for selecting and operating the appropriate test equipment, describes physical criteria for detectable discontinuities,…

  4. Project W-211 Initial Tank Retrieval Systems (ITRS) Description of Operations for 241-AZ-102

    BRIGGS, S.R.

    2000-02-25

    The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTs) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operation (DOO) defines the control philosophy for the waste retrieval system for Tank 241-AZ-102 (AZ-102). This DOO provides a basis for the detailed design of the Project W-211 Retrieval Control System (RCS) for AZ-102 and also establishes test criteria for the RCS.

  5. SY-101 Rapid Transfer Project Low Temperature Operations Review and Recommendations to Support Lower Temperature Limits

    HICKMAN, G.L.

    2000-01-01

    The lower temperature limit for the 241 SY-101 RAPID transfer project is currently set at 20 F Based on the analysis and recommendations in this document this limit can be lowered to 0 F. Analysis of all structures systems and components (SSCs) indicate that a reduction in operating temperature may be achieved with minor modifications to field-installed equipment. Following implementation of these changes it is recommended that the system requirements be amended to specify a temperature range for transfer or back dilute evolutions of 0 F to 100 F

  6. Design, construction, and operation of the contact size reduction facility at the West Valley Demonstration Project

    Frank, D.E.; Reeves, S.R.; Valenti, P.J.

    1988-05-01

    This paper describes the design, construction and initial operation of the Contact-Handled Size Reduction Facility (CSRF) at the West Valley Demonstration Project. The facility was constructed to size reduce contaminated tanks, piping, and other metallic scrap and package the scrap for disposal. In addition, the CSRF has the capability to decontaminate scrap prior to disposal. The anticipated result of decontaminating the scrap is to reduce waste classified as transuranic or low-level Class B and C to Class A or release for unrestricted use as nonradioactive equipment. 10 figs., 1 tab

  7. The impact of the MCU life extension solvent on sludge batch 8 projected operating windows

    Peeler, D.K.; Edwards, T.B.

    2013-01-01

    As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NGS) and a new strip acid will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing or evaluations with the next generation solvent are required to determine the impact of these changes (if any) to Chemical Process Cell (CPC) activities, glass formulation strategies, and melter operations at the Defense Waste Processing Facility (DWPF). The introduction of the dilute (0.01 M) boric acid stream into the DWPF flowsheet has a potential impact on glass formulation and frit development efforts since B203 is a major oxide in frits developed for DWPF. Prior knowledge of this stream can be accounted for during frit development efforts but that was not the case for Sludge Batch 8 (SB8). Frit 803 has already been recommended and procured for SB8 processing; altering the frit to account for the incoming boron from the strip effluent (SE) is not an option for SB8. Therefore, the operational robustness of Frit 803 to the introduction of SE including its compositional tolerances (i.e., up to 0.0125M boric acid) is of interest and was the focus of this study. The primary question to be addressed in the current study was: What is the impact (if any) on the projected operating windows for the Frit 803 - SB8 flowsheet to additions of B203 from the SE in the Sludge Receipt and Adjustment Tank (SRAT)? More specifically, will Frit 803 be robust to the potential compositional changes occurring in the SRAT due to sludge variation, varying additions of ARP and/or the introduction of SE by providing access to waste loadings (WLs) of interest to DWPF? The Measurement Acceptability Region (MAR) results indicate there is very little, if any, impact on the projected operating windows for the Frit 803 - SB8 system regardless of the presence or absence of

  8. Apollo Soyuz Test Project Weights and Mass Properties Operational Management System

    Collins, M. A., Jr.; Hischke, E. R.

    1975-01-01

    The Apollo Soyuz Test Project (ASTP) Weights and Mass Properties Operational Management System was established to assure a timely and authoritative method of acquiring, controlling, generating, and disseminating an official set of vehicle weights and mass properties data. This paper provides an overview of the system and its interaction with the various aspects of vehicle and component design, mission planning, hardware and software simulations and verification, and real-time mission support activities. The effect of vehicle configuration, design maturity, and consumables updates is discussed in the context of weight control.

  9. Project W-211 Initial Tank Retrieval Systems (ITRS) Description of Operations for 241-AZ-102

    BRIGGS, S.R.

    2000-01-01

    The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTs) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operation (DOO) defines the control philosophy for the waste retrieval system for Tank 241-AZ-102 (AZ-102). This DOO provides a basis for the detailed design of the Project W-211 Retrieval Control System (RCS) for AZ-102 and also establishes test criteria for the RCS

  10. Development of Advanced Monitoring System with Reactor Neutrino Detection Technique for Verification of Reactor Operations

    Furuta, H.; Tadokoro, H.; Imura, A.; Furuta, Y.; Suekane, F.

    2010-01-01

    Recently, technique of Gadolinium-loaded liquid scintillator (Gd-LS) for reactor neutrino oscillation experiments has attracted attention as a monitor of reactor operation and ''nuclear Gain (GA)'' for IAEA safeguards. When the thermal operation power is known, it is, in principle, possible to non-destructively measure the ratio of Pu/U in reactor fuel under operation from the reactor neutrino flux. An experimental program led by Lawrence Livermore National Laboratory and Sandia National Laboratories in USA has already demonstrated feasibility of the reactor monitoring by neutrinos at San Onofre Nuclear Power Station, and the Pu monitoring by neutrino detection is recognized as a candidate of novel technology to detect undeclared operation of reactor. However, further R and D studies of detector design and materials are still necessary to realize compact and mobile detector for practical use of neutrino detector. Considering the neutrino interaction cross-section and compact detector size, the detector must be set at a short distance (a few tens of meters) from reactor core to accumulate enough statistics for monitoring. In addition, although previous reactor neutrino experiments were performed at underground to reduce cosmic ray muon background, feasibility of the measurement at ground level is required for the monitor considering limited access to the reactor site. Therefore, the detector must be designed to be able to reduce external backgrounds extremely without huge shields at ground level, eg. cosmic ray muons and fast neutrons. We constructed a 0.76 ton Gd-LS detector, and carried out a reactor neutrino measurement at the experimental fast reactor JOYO in 2007. The neutrino detector was set up at 24.3m away from the reactor core at the ground level, and we understood the property of the main background; the cosmic-ray induced fast neutron, well. Based on the experience, we are constructing a new detector for the next experiment. The detector is a Gd

  11. SU-E-T-191: PITSTOP: Process Improvement Techniques, Software Tools, and Operating Principles for a Quality Initiative Discovery Framework.

    Siochi, R

    2012-06-01

    To develop a quality initiative discovery framework using process improvement techniques, software tools and operating principles. Process deviations are entered into a radiotherapy incident reporting database. Supervisors use an in-house Event Analysis System (EASy) to discuss incidents with staff. Major incidents are analyzed with an in-house Fault Tree Analysis (FTA). A meta-Analysis is performed using association, text mining, key word clustering, and differential frequency analysis. A key operating principle encourages the creation of forcing functions via rapid application development. 504 events have been logged this past year. The results for the key word analysis indicate that the root cause for the top ranked key words was miscommunication. This was also the root cause found from association analysis, where 24% of the time that an event involved a physician it also involved a nurse. Differential frequency analysis revealed that sharp peaks at week 27 were followed by 3 major incidents, two of which were dose related. The peak was largely due to the front desk which caused distractions in other areas. The analysis led to many PI projects but there is still a major systematic issue with the use of forms. The solution we identified is to implement Smart Forms to perform error checking and interlocking. Our first initiative replaced our daily QA checklist with a form that uses custom validation routines, preventing therapists from proceeding with treatments until out of tolerance conditions are corrected. PITSTOP has increased the number of quality initiatives in our department, and we have discovered or confirmed common underlying causes of a variety of seemingly unrelated errors. It has motivated the replacement of all forms with smart forms. © 2012 American Association of Physicists in Medicine.

  12. TAX TREATMENT OF CARBON CREDIT OPERATIONS IN BRAZILIAN COMPANIES WITH CDM PROJECTS

    Vanderlei dos Santos

    2012-06-01

    Full Text Available The aim in this study is to identify the tax treatment applied to carbon credit operations in Brazilian companies that are developing projects in the context of the Clean Development Mechanism (CDM. Therefore, an exploratory research with a qualitative approach was developed. Data were collected with the help of questionnaire, forwarded to all Brazilian companies with CDM projects that received approval from the Inter-Ministerial Commission on Global Climate Change (CIMGC without safeguards, according to the list of the Brazilian Ministry of Science and Technology. Out of 117 companies listed, only five answered the research instrument, which represents an accessibility sample. The results show that, as for the tax treatment applied in the companies under analysis, IRPJ and CSLL should be charged on carbon credit operations. Regarding PIS, COFINS, ISS, some companies considered that these taxes are due and others that they are not. There is a consensus, though, about the fact that ICMS and IOF should not be charged. In conclusion, no uniform understanding exists as of yet about due taxes in the research sample, as no specific fiscal legislation exists yet on carbon credits in Brazil.

  13. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  14. Comparison of adaptive statistical iterative and filtered back projection reconstruction techniques in quantifying coronary calcium.

    Takahashi, Masahiro; Kimura, Fumiko; Umezawa, Tatsuya; Watanabe, Yusuke; Ogawa, Harumi

    2016-01-01

    Adaptive statistical iterative reconstruction (ASIR) has been used to reduce radiation dose in cardiac computed tomography. However, change of image parameters by ASIR as compared to filtered back projection (FBP) may influence quantification of coronary calcium. To investigate the influence of ASIR on calcium quantification in comparison to FBP. In 352 patients, CT images were reconstructed using FBP alone, FBP combined with ASIR 30%, 50%, 70%, and ASIR 100% based on the same raw data. Image noise, plaque density, Agatston scores and calcium volumes were compared among the techniques. Image noise, Agatston score, and calcium volume decreased significantly with ASIR compared to FBP (each P ASIR reduced Agatston score by 10.5% to 31.0%. In calcified plaques both of patients and a phantom, ASIR decreased maximum CT values and calcified plaque size. In comparison to FBP, adaptive statistical iterative reconstruction (ASIR) may significantly decrease Agatston scores and calcium volumes. Copyright © 2016 Society of Cardiovascular Computed Tomography. Published by Elsevier Inc. All rights reserved.

  15. Experiences of operational costs of HPV vaccine delivery strategies in Gavi-supported demonstration projects

    Holroyd, Taylor; Nanda, Shreya; Bloem, Paul; Griffiths, Ulla K.; Sidibe, Anissa; Hutubessy, Raymond C. W.

    2017-01-01

    From 2012 to 2016, Gavi, the Vaccine Alliance, provided support for countries to conduct small-scale demonstration projects for the introduction of the human papillomavirus vaccine, with the aim of determining which human papillomavirus vaccine delivery strategies might be effective and sustainable upon national scale-up. This study reports on the operational costs and cost determinants of different vaccination delivery strategies within these projects across twelve countries using a standardized micro-costing tool. The World Health Organization Cervical Cancer Prevention and Control Costing Tool was used to collect costing data, which were then aggregated and analyzed to assess the costs and cost determinants of vaccination. Across the one-year demonstration projects, the average economic and financial costs per dose amounted to US$19.98 (standard deviation ±12.5) and US$8.74 (standard deviation ±5.8), respectively. The greatest activities representing the greatest share of financial costs were social mobilization at approximately 30% (range, 6–67%) and service delivery at about 25% (range, 3–46%). Districts implemented varying combinations of school-based, facility-based, or outreach delivery strategies and experienced wide variation in vaccine coverage, drop-out rates, and service delivery costs, including transportation costs and per diems. Size of target population, number of students per school, and average length of time to reach an outreach post influenced cost per dose. Although the operational costs from demonstration projects are much higher than those of other routine vaccine immunization programs, findings from our analysis suggest that HPV vaccination operational costs will decrease substantially for national introduction. Vaccination costs may be decreased further by annual vaccination, high initial investment in social mobilization, or introducing/strengthening school health programs. Our analysis shows that drivers of cost are dependent on

  16. The surgical care improvement project and prevention of post-operative infection, including surgical site infection.

    Rosenberger, Laura H; Politano, Amani D; Sawyer, Robert G

    2011-06-01

    In response to inconsistent compliance with infection prevention measures, the Centers for Medicare & Medicaid Services collaborated with the U.S. Centers for Disease Control and Prevention on the Surgical Infection Prevention (SIP) project, introduced in 2002. Quality improvement measures were developed to standardize processes to increase compliance. In 2006, the Surgical Care Improvement Project (SCIP) developed out of the SIP project and its process measures. These initiatives, published in the Specifications Manual for National Inpatient Quality Measures, outline process and outcome measures. This continually evolving manual is intended to provide standard quality measures to unify documentation and track standards of care. Seven of the SCIP initiatives apply to the peri-operative period: Prophylactic antibiotics should be received within 1 h prior to surgical incision (1), be selected for activity against the most probable antimicrobial contaminants (2), and be discontinued within 24 h after the surgery end-time (3); (4) euglycemia should be maintained, with well-controlled morning blood glucose concentrations on the first two post-operative days, especially in cardiac surgery patients; (6) hair at the surgical site should be removed with clippers or by depilatory methods, not with a blade; (9) urinary catheters are to be removed within the first two post-operative days; and (10) normothermia should be maintained peri-operatively. There is strong evidence that implementation of protocols that standardize practices reduce the risk of surgical infection. The SCIP initiative targets complications that account for a significant portion of preventable morbidity as well as cost. One of the goals of the SCIP guidelines was a 25% reduction in the incidence of surgical site infections from implementation through 2010. Process measures are becoming routine, and as we practice more evidence-based medicine, it falls to us, the surgeons and scientists, to be active

  17. Co-operation between Slovenia and Croatia in the low- and intermediate level radioactive waste repository project

    Schaller, A.; Lokner, V.; Subasic, D.; Zeleznik, N.; Mele, I.; Tomse, P.

    2001-01-01

    The paper describes the LILW repository project development in Slovenia and Croatia from the viewpoint of co-operation of national agencies for radioactive waste management - ARAO in Slovenia and APO in Croatia. The project performance, as well as the co-operation itself, are based on the fact that NPP Krsko, sited in Slovenia, is the joint venture facility of both countries, which are consequently obliged to find a proper solution for final disposal of operational and decommissioning radioactive waste generated by the plant. The main aspects of the project development in both countries, such as LILW repository site selection and characterisation, development of repository conceptual design, performance assessment/safety analysis procedures and public participation, are presented in the paper. Based on separate descriptions of the project development in Slovenia and Croatia respectively, the main aspects of co-operation between ARAO and APO are elaborated.(author)

  18. Lagrangian relaxation technique in power systems operation planning: Multipliers updating problem

    Ruzic, S. [Electric Power Utility of Serbia, Belgrade (Yugoslavia)

    1995-11-01

    All Lagrangian relaxation based approaches to the power systems operation planning have an important common part: the Lagrangian multipliers correction procedure. It is the subject of this paper. Different approaches presented in the literature are discussed and an original method for the Lagrangian multipliers updating is proposed. The basic idea of this new method is to update Lagrangian multipliers trying to satisfy Khun-Tucker optimality conditions. Instead of the dual function maximization the `distance of optimality function` is defined and minimized. If Khun-Tucker optimality conditions are satisfied the value of this function is in range (-1,0); otherwise the function has a big positive value. This method called `the distance of optimality method` takes into account future changes in planning generations due to the Lagrangian multipliers updating. The influence of changes in a multiplier associated to one system constraint to the satisfaction of some other system requirements is also considered. The numerical efficiency of the proposed method is analyzed and compared with results obtained using the sub-gradient technique. 20 refs, 2 tabs

  19. Perineal colostomy: an alternative to avoid permanent abdominal colostomy: operative technique, results and reflection.

    da Silva, Alcino Lázaro; Hayck, Johnny; Deoti, Beatriz

    2014-01-01

    The most common injury to indicate definitive stoma is rectal cancer. Despite advances in surgical treatment, the abdominoperineal resection is still the most effective operation in radical treatment of malignancies of the distal rectum invading the sphincter and anal canal. Even with all the effort that surgeons have to preserve anal sphincters, abdominoperineal amputation is still indicated, and a definitive abdominal colostomy is necessary. This surgery requires patients to live with a definitive abdominal colostomy, which is a condition that modify body image, is not without morbidity and has great impact on the quality of life. To evaluate the technique of abdominoperineal amputation with perineal colostomy with irrigation as an alternative to permanent abdominal colostomy. Retrospective analysis of medical records of 55 patients underwent abdominoperineal resection of the rectum with perineal colostomy in the period 1989-2010. The mean age was 58 years, 40 % men and 60 % women. In 94.5% of patients the indication for surgery was for cancer of the rectum. In some patients were made three valves, other two valves and in the remaining no valve at all. Complications were: mucosal prolapse, necrosis of the lowered segment and stenosis. The abdominoperineal amputation with perineal colostomy is a good therapeutic option in the armamentarium of the surgical treatment of rectal cancer.

  20. Project O.R.B (Operation Reef Ball): Creating Artificial Reefs, Educating the Community

    Phipps, A.

    2012-04-01

    The Project O.R.B. (Operation Reef Ball) team at South Plantation High School's Everglades Restoration & Environmental Science Magnet Program is trying to help our ailing south Florida coral reefs by constructing, deploying, and monitoring designed artificial reefs. Students partnered with the Reef Ball Foundation, local concrete companies, state parks, Girl Scouts, Sea Scouts, local universities and environmental agencies to construct concrete reef balls, each weighing approximately 500 lbs (227 kg). Students then deployed two artificial reefs consisting of over 30 concrete reef balls in two sites previously permitted for artificial reef deployment. One artificial reef was placed approximately 1.5 miles (2.4 km) offshore of Golden Beach in Miami-Dade County with the assistance of Florida Atlantic University and their research vessel. A twin reef was deployed at the mouth of the river in Oleta River State Park in Miami. Monitoring and maintenance of the sites is ongoing with semi-annual reports due to the Reef Ball Foundation and DERM (Department of Environmental Resource Management) of Miami-Dade County. A second goal of Project O.R.B. is aligned with the Florida Local Action Strategy, the Southeast Florida Coral Reef Initiative, and the U.S. Coral Reef Task Force, all of which point out the importance of awareness and education as key components to the health of our coral reefs. Project O.R.B. team members developed and published an activity book targeting elementary school students. Outreach events incorporate cascade learning where high school students teach elementary and middle school students about various aspects of coral reefs through interactive "edu-tainment" modules. Attendees learn about water sampling, salinity, beach erosion, surface runoff, water cycle, ocean zones, anatomy of coral, human impact on corals, and characteristics of a well-designed artificial reef. Middle school students snorkel on the artificial reef to witness first-hand the success

  1. [Application of operant conditioning techniques to forensic toxicology: experimental studies on alcohol and abusable drugs].

    Hishida, S

    1996-10-01

    This paper describes some experiments that apply the operant conditioning techniques to forensic toxicological research. These techniques may be useful in investigating the mechanisms of action, toxic symptoms, legal competence and drug metabolism associated with substance abuse such as abuse of alcohol, psychotropic drugs, narcotics, stimulants, and organic solvents. 1) Genetic research on alcohol preference in rats. We applied operant conditioning to investigate alcohol preference in rats and constructed an apparatus for the measurement of discriminated operate responses for water or alcohol reinforcement in rat. This apparatus is a modified Skinner box with a one-lever two-liquid system. Fixed ratio-10 (FR-10) schedules of reinforcement are used to increase the work of the rat before it obtains the reinforcement. The voluntary choice of water or 10% ethanol by the rat can be assessed quantitatively by measuring the lever-pushing responses. It is an extremely useful method for measuring the real alcohol preference of rats. A rat was kept in a Skinner box overnight. The numbers of responses and reinforcement for water and ethanol and the volumes of the two liquids consumed were recorded. The ratio of ethanol reinforcement was defined as the number of ethanol reinforcement to the total number of ethanol and water reinforcement. The ratio of ethanol intake was defined as the volume of ethanol consumed to the volume of water and ethanol consumed. Ethanol consumption per g body weight was calculated from the volume of ethanol consumed by the rat. We used this apparatus to investigate alcohol preference of more than 300 Wistar Albino Rats, and divided them into a high alcohol preference (HAP) group and a low alcohol preference (LAP) group. Inbreeding between littermates was conducted in each of the HAP and LAP groups. The liver tissue of each offspring was obtained and the cytosol fraction was collected and subjected to isoelectric focusing using polyacrylamide gel

  2. Summary of operations and performance of the Murdock site restoration project in June 2005-December 2006.

    LaFreniere, L. M.; Environmental Science Division

    2007-05-31

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the initial period of systems operation, from June 2005 through December 2006. In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the initial period of operation.

  3. The grating projection system: a laser light pattern projection technique for long distance illumination based on the Talbot effect

    Castagner, J L; Jones, A R

    2003-01-01

    Inspired by the Talbot effect, a grating projection system was designed. Periodic patterns were produced from a projection of a diffraction grating illuminated by a spherical wave of monochromatic coherent light. The diffracted light was collimated by a lens, the focal distance of which was at the centre of the incident spherical wave. Experiments demonstrated that the diffracted orders were also spherical waves centred on the same transverse plane as the incident light. The periodic illumination observed at different locations along the optic axis was proven to be the result of interference between the diffracted orders. It was demonstrated that this system could be used to measure velocities up to 20 m s -1 of particles crossing the fringes at distances up to 3 m

  4. 77 FR 74882 - STP Nuclear Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48...

    2012-12-18

    ... Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of South Texas Project Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has...

  5. The SARVIEWS Project: Automated SAR Processing in Support of Operational Near Real-time Volcano Monitoring

    Meyer, F. J.; Webley, P. W.; Dehn, J.; Arko, S. A.; McAlpin, D. B.; Gong, W.

    2016-12-01

    Volcanic eruptions are among the most significant hazards to human society, capable of triggering natural disasters on regional to global scales. In the last decade, remote sensing has become established in operational volcano monitoring. Centers like the Alaska Volcano Observatory rely heavily on remote sensing data from optical and thermal sensors to provide time-critical hazard information. Despite this high use of remote sensing data, the presence of clouds and a dependence on solar illumination often limit their impact on decision making. Synthetic Aperture Radar (SAR) systems are widely considered superior to optical sensors in operational monitoring situations, due to their weather and illumination independence. Still, the contribution of SAR to operational volcano monitoring has been limited in the past due to high data costs, long processing times, and low temporal sampling rates of most SAR systems. In this study, we introduce the automatic SAR processing system SARVIEWS, whose advanced data analysis and data integration techniques allow, for the first time, a meaningful integration of SAR into operational monitoring systems. We will introduce the SARVIEWS database interface that allows for automatic, rapid, and seamless access to the data holdings of the Alaska Satellite Facility. We will also present a set of processing techniques designed to automatically generate a set of SAR-based hazard products (e.g. change detection maps, interferograms, geocoded images). The techniques take advantage of modern signal processing and radiometric normalization schemes, enabling the combination of data from different geometries. Finally, we will show how SAR-based hazard information is integrated in existing multi-sensor decision support tools to enable joint hazard analysis with data from optical and thermal sensors. We will showcase the SAR processing system using a set of recent natural disasters (both earthquakes and volcanic eruptions) to demonstrate its

  6. A technique for on-board CT reconstruction using both kilovoltage and megavoltage beam projections for 3D treatment verification

    Yin Fangfang; Guan Huaiqun; Lu Wenkai

    2005-01-01

    The technologies with kilovoltage (kV) and megavoltage (MV) imaging in the treatment room are now available for image-guided radiation therapy to improve patient setup and target localization accuracy. However, development of strategies to efficiently and effectively implement these technologies for patient treatment remains challenging. This study proposed an aggregated technique for on-board CT reconstruction using combination of kV and MV beam projections to improve the data acquisition efficiency and image quality. These projections were acquired in the treatment room at the patient treatment position with a new kV imaging device installed on the accelerator gantry, orthogonal to the existing MV portal imaging device. The projection images for a head phantom and a contrast phantom were acquired using both the On-Board Imager TM kV imaging device and the MV portal imager mounted orthogonally on the gantry of a Varian Clinac TM 21EX linear accelerator. MV projections were converted into kV information prior to the aggregated CT reconstruction. The multilevel scheme algebraic-reconstruction technique was used to reconstruct CT images involving either full, truncated, or a combination of both full and truncated projections. An adaptive reconstruction method was also applied, based on the limited numbers of kV projections and truncated MV projections, to enhance the anatomical information around the treatment volume and to minimize the radiation dose. The effects of the total number of projections, the combination of kV and MV projections, and the beam truncation of MV projections on the details of reconstructed kV/MV CT images were also investigated

  7. Implications of commodity price risk and operating leverage on petroleum project economic evaluations

    Salahor, G.; Laughton, D.G.

    1999-01-01

    The modern asset pricing method, MAP, can provide businesses with improved tools for economic analysis. This in turn leads to greater precision in the analysis of the effects of the following parameters: project structure, time, and uncertainty. This greater precision with MAP extends to analysis of the possibility for active control of the decision alternatives for managers in the petroleum business, especially where this possibility is not questioned. A methodology is developed as a model that quantifies revenue risk based on the nature of commodity price volatility and the accepted price of risk in the commodity market. A mathematical description is included of a natural gas log-normal distribution incorporating the annual volatility in the forecast, and a measure of the rate at which volatility decreases in the long run in the forecast. Give this volatility model, a risk discount factor is determinable and applicable to the current expectation of the commodity prices at a given time, and a discount time factor of all parts of the cash flow stream. Cases are used to evaluate a natural gas development project for the purpose of yielding scenarios for capital vs. operating cost trade-offs, price risk management, production profile, and the effect of the reverting vs. non-reverting price model. In application one, a comparison is made of discounted cash flow (DCF) to MAP evaluations giving a perspective on the various development choices which a producer has through third-party service providers. Further, an example is used to compare the two methods as alternative evaluations of development alternatives to speed up or slow down the production rate and decline profile of a gas field. As in the first example, the DCF discounting is higher than the net discounting in the MAP evaluation. But in this example both methods produce the same project structure decision. The small amount of incremental capital and operating costs needed for the higher production case are

  8. Summary of operations and performance of the Murdock site restoration project in 2007.

    LaFreniere, L. M.; Environmental Science Division

    2008-06-03

    This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief

  9. Responding to change - The evolution of operator training for the PFR liquid metals disposal project

    Cashmore, Stephen

    2006-01-01

    environmental management practice, UKAEA decided to add a Caesium Removal Plant (CRP) on to the SDP. Neutralized effluent from the SDP would now be pumped through an ion exchange column prior to discharge to the site effluent treatment plant. In conclusion, commissioning and operating the PFR Liquid Metals Disposal Plant was a challenging task. Training and qualifying the operators was part of that challenge. Though lengthy and time intensive, the LMD training process had several positive benefits: 1. The process demonstrated that persons from a semi-skilled background with little or no previous experience, could be trained to operate a relatively complex process plant safely and efficiently; 2. The formally documented progress of each stage of training provided a clearly auditable record that was acceptable to all parties, including the regulators; 3. The cost of implementing the training was more than compensated for by the saving made in not having to employ shift engineers for the LMD project; 4. Once proved, the training methodology lent itself to adaptation for use with similar projects at Dounreay; 5. The range of skills and knowledge, acquired by the operators during their training, together with their experience of formal learning, should assist them with any similar role they may wish to apply themselves to in the future. To date (November 2005) the LMD plant has successfully processed over 1000 te of PFR's liquid metal inventory, improving safety by reducing a major potential hazard. It has also enabled UKAEA to meet the targets set by the Dounreay Near Term Work Plan for decommissioning the site. The operator team has had their SQEP status formally reviewed by the UKAEA ATO Holder, and extended for a further year, demonstrating the ongoing value of the rigorous training programme they undertook initially

  10. Hubble Tarantula Treasury Project - VI. Identification of Pre-Main-Sequence Stars using Machine Learning techniques

    Ksoll, Victor F.; Gouliermis, Dimitrios A.; Klessen, Ralf S.; Grebel, Eva K.; Sabbi, Elena; Anderson, Jay; Lennon, Daniel J.; Cignoni, Michele; de Marchi, Guido; Smith, Linda J.; Tosi, Monica; van der Marel, Roeland P.

    2018-05-01

    The Hubble Tarantula Treasury Project (HTTP) has provided an unprecedented photometric coverage of the entire star-burst region of 30 Doradus down to the half Solar mass limit. We use the deep stellar catalogue of HTTP to identify all the pre-main-sequence (PMS) stars of the region, i.e., stars that have not started their lives on the main-sequence yet. The photometric distinction of these stars from the more evolved populations is not a trivial task due to several factors that alter their colour-magnitude diagram positions. The identification of PMS stars requires, thus, sophisticated statistical methods. We employ Machine Learning Classification techniques on the HTTP survey of more than 800,000 sources to identify the PMS stellar content of the observed field. Our methodology consists of 1) carefully selecting the most probable low-mass PMS stellar population of the star-forming cluster NGC2070, 2) using this sample to train classification algorithms to build a predictive model for PMS stars, and 3) applying this model in order to identify the most probable PMS content across the entire Tarantula Nebula. We employ Decision Tree, Random Forest and Support Vector Machine classifiers to categorise the stars as PMS and Non-PMS. The Random Forest and Support Vector Machine provided the most accurate models, predicting about 20,000 sources with a candidateship probability higher than 50 percent, and almost 10,000 PMS candidates with a probability higher than 95 percent. This is the richest and most accurate photometric catalogue of extragalactic PMS candidates across the extent of a whole star-forming complex.

  11. Comparison analysis between filtered back projection and algebraic reconstruction technique on microwave imaging

    Ramadhan, Rifqi; Prabowo, Rian Gilang; Aprilliyani, Ria; Basari

    2018-02-01

    Victims of acute cancer and tumor are growing each year and cancer becomes one of the causes of human deaths in the world. Cancers or tumor tissue cells are cells that grow abnormally and turn to take over and damage the surrounding tissues. At the beginning, cancers or tumors do not have definite symptoms in its early stages, and can even attack the tissues inside of the body. This phenomena is not identifiable under visual human observation. Therefore, an early detection system which is cheap, quick, simple, and portable is essensially required to anticipate the further development of cancer or tumor. Among all of the modalities, microwave imaging is considered to be a cheaper, simple, and portable system method. There are at least two simple image reconstruction algorithms i.e. Filtered Back Projection (FBP) and Algebraic Reconstruction Technique (ART), which have been adopted in some common modalities. In this paper, both algorithms will be compared by reconstructing the image from an artificial tissue model (i.e. phantom), which has two different dielectric distributions. We addressed two performance comparisons, namely quantitative and qualitative analysis. Qualitative analysis includes the smoothness of the image and also the success in distinguishing dielectric differences by observing the image with human eyesight. In addition, quantitative analysis includes Histogram, Structural Similarity Index (SSIM), Mean Squared Error (MSE), and Peak Signal-to-Noise Ratio (PSNR) calculation were also performed. As a result, quantitative parameters of FBP might show better values than the ART. However, ART is likely more capable to distinguish two different dielectric value than FBP, due to higher contrast in ART and wide distribution grayscale level.

  12. Proceedings of the Canadian Institute conference on supply chain management in the oil and gas industry : major capital construction projects, maintenance, repair and operations

    2005-01-01

    Many companies are now being forced to focus on careful budgeting to ensure that the capital costs of large-scale construction projects do not exceed their budgets. Operators are now investigating the role of supply chain management in reducing project costs. This conference provided a forum for the discussion of issues related to large construction projects for supply chain management in the oil and gas industry. Participants at the conference discussed methods of negotiating with contractors in order to manage higher prices for steel and other commodities. Best practices for maintaining effective purchaser-contractor relations were discussed along with cost benchmarks in contracts and management planning techniques for supply chain processes. The benefits of adopting vendor-managed inventory systems were also examined. Sourcing strategies were presented and issues related to transportation were reviewed along with various planning models. The conference featured 16 presentations. tabs., figs

  13. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  14. Summary of FY 1980 results of Sunshine Project. Development of coal liquefaction techniques; 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sunshine keikaku itaku kenkyu kaihatsu

    NONE

    1981-03-01

    This report summarizes the results of the 3 R and D themes for coal liquefaction techniques, pursued by the Sunshine Project; (1) development of solvent extraction type liquefaction plant, and brown coal liquefaction technique R and D demonstration surveys, (2) development of solvolysis type liquefaction plant, and (3) development of direct hydrogenation type liquefaction plant. For the theme (1), the 1 T/D test plant, solid/liquid separator and small-size continuous settlement separator are constructed, and partly completed. The elementary studies include solvent extraction type liquefaction process, materials for coal liquefaction plant and solid/liquid separation. Australia's Victoria brown coal and Chinese coal are studied to clarify the possible problems involved in liquefaction of these coal species for commercialization of the liquefaction techniques in the early stage. The elementary techniques studied include dehydration of brown coal, milling at high temperature in oil, de-ashing, and secondary and primary hydrogenation. For the theme (2), the 1 T/D plant is inspected and maintained to clarify the problems involved in the continuous operation, revamped and repaired as necessary, given preventive maintenance, and tested for operability confirmation. The elementary studies include solvolysis type liquefaction process, scale-up, hydrogenation plant for solvolysis pitch. For the item (3), the 2.4 T/D test plant is constructed, and the elementary studies are conducted, for, e.g., liquefaction reactions in the presence of an iron-based catalyst. (NEDO)

  15. Summary of FY 1980 results of Sunshine Project. Development of coal liquefaction techniques; 1980 nendo sekitan ekika gijutsu no kaihatsu seika hokokusho. Sunshine keikaku itaku kenkyu kaihatsu

    NONE

    1981-03-01

    This report summarizes the results of the 3 R and D themes for coal liquefaction techniques, pursued by the Sunshine Project; (1) development of solvent extraction type liquefaction plant, and brown coal liquefaction technique R and D demonstration surveys, (2) development of solvolysis type liquefaction plant, and (3) development of direct hydrogenation type liquefaction plant. For the theme (1), the 1 T/D test plant, solid/liquid separator and small-size continuous settlement separator are constructed, and partly completed. The elementary studies include solvent extraction type liquefaction process, materials for coal liquefaction plant and solid/liquid separation. Australia's Victoria brown coal and Chinese coal are studied to clarify the possible problems involved in liquefaction of these coal species for commercialization of the liquefaction techniques in the early stage. The elementary techniques studied include dehydration of brown coal, milling at high temperature in oil, de-ashing, and secondary and primary hydrogenation. For the theme (2), the 1 T/D plant is inspected and maintained to clarify the problems involved in the continuous operation, revamped and repaired as necessary, given preventive maintenance, and tested for operability confirmation. The elementary studies include solvolysis type liquefaction process, scale-up, hydrogenation plant for solvolysis pitch. For the item (3), the 2.4 T/D test plant is constructed, and the elementary studies are conducted, for, e.g., liquefaction reactions in the presence of an iron-based catalyst. (NEDO)

  16. Environmental assessment related to the operation of Hansen uranium mill project, WM-24, Cyprus Mines Corporation

    1981-01-01

    An environmental assessment was prepared by the staff of the U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, in response to a request for technical assistance from the State of Colorado in connection with licensing action on the proposed Cyprus Mines Corporation, Hansen uranium project. The major components of discussion are (1) a summary and recommended licensing conditions, (2) a description of the site environment and the proposed facility operation as well as alternatives in comparison with NRC's performance objectives for tailings management, and (3) a radiological assessment for estimating the facility's compliance with 10 CFR 20 and 40 CFR 190 dose regulations. The NRC recommends licensing the proposed mill subject to stipulated license conditions

  17. Environmental assessment related to the operation of San Miguel uranium project, WM-20, Phoneer Uravan, Inc

    1981-01-01

    An environmental assessment was prepared by the staff of the U.S. Nuclear Regulatory Commission, Office of Nuclear Material Safety and Safeguards, in response to a request for technical assistance from the State of Colorado in connection with licensing action on the proposed Pioneer Uravan, Inc., San Miguel uranium project. The major components of discussion are (1) a summary and recommended licensing conditions, (2) a description of the site environment and the proposed facility operation as well as alternatives in comparison with NRC's performance objectives for tailings management, and (3) a radiological assessment for estimating the facility's compliance with 10 CFR 20 and 40 CFR 190 dose regulations. The NRC recommends licensing the proposed mill subject to stipulated license conditions

  18. Research and Development for an Operational Information Ecology: The User-System Interface Agent Project

    Srivastava, Sadanand; deLamadrid, James

    1998-01-01

    The User System Interface Agent (USIA) is a special type of software agent which acts as the "middle man" between a human user and an information processing environment. USIA consists of a group of cooperating agents which are responsible for assisting users in obtaining information processing services intuitively and efficiently. Some of the main features of USIA include: (1) multiple interaction modes and (2) user-specific and stereotype modeling and adaptation. This prototype system provides us with a development platform towards the realization of an operational information ecology. In the first phase of this project we focus on the design and implementation of prototype system of the User-System Interface Agent (USIA). The second face of USIA allows user interaction via a restricted query language as well as through a taxonomy of windows. In third phase the USIA system architecture was revised.

  19. The Impact Of The MCU Life Extension Solvent On Sludge Batch 8 Projected Operating Windows

    Peeler, D. K.; Edwards, T. B.; Stone, M. E.

    2013-01-01

    As a part of the Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Project, a next generation solvent (NGS) and a new strip acid will be deployed. The strip acid will be changed from dilute nitric acid to dilute boric acid (0.01 M). Because of these changes, experimental testing or evaluations with the next generation solvent are required to determine the impact of these changes (if any) to Chemical Process Cell (CPC) activities, glass formulation strategies, and melter operations at the Defense Waste Processing Facility (DWPF). The introduction of the dilute (0.01M) boric acid stream into the DWPF flowsheet has a potential impact on glass formulation and frit development efforts since B2O3 is a major oxide in frits developed for DWPF. Prior knowledge of this stream can be accounted for during frit development efforts but that was not the case for Sludge Batch 8 (SB8). Frit 803 has already been recommended and procured for SB8 processing; altering the frit to account for the incoming boron from the strip effluent (SE) is not an option for SB8. Therefore, the operational robustness of Frit 803 to the introduction of SE including its compositional tolerances (i.e., up to 0.0125M boric acid) is of interest and was the focus of this study. The primary question to be addressed in the current study was: What is the impact (if any) on the projected operating windows for the Frit 803 - SB8 flowsheet to additions of B2O3 from the SE in the Sludge Receipt and Adjustment Tank (SRAT)? More specifically, will Frit 803 be robust to the potential compositional changes occurring in the SRAT due to sludge variation, varying additions of ARP and/or the introduction of SE by providing access to waste loadings (WLs) of interest to DWPF? The Measurement Acceptability Region (MAR) results indicate there is very little, if any, impact on the projected operating windows for the Frit 803 - SB8 system regardless of the presence or absence of

  20. Realization of universal optimal quantum machines by projective operators and stochastic maps

    Sciarrino, F.; Sias, C.; Ricci, M.; De Martini, F.

    2004-01-01

    Optimal quantum machines can be implemented by linear projective operations. In the present work a general qubit symmetrization theory is presented by investigating the close links to the qubit purification process and to the programmable teleportation of any generic optimal antiunitary map. In addition, the contextual realization of the N→M cloning map and of the teleportation of the N→(M-N) universal-NOT (UNOT) gate is analyzed by a very general angular momentum theory. An extended set of experimental realizations by state symmetrization linear optical procedures is reported. These include the 1→2 cloning process, the UNOT gate and the quantum tomographic characterization of the optimal partial transpose map of polarization encoded qubits

  1. Orthogonal Projection-Based Harmonic Signal Removal for Operational Modal Analysis

    Gres, Szymon; Andersen, Palle; Hoen, C.

    2019-01-01

    A presence of a high amplitude periodic signals in the output responses from operating structures often pose a challenge for output-only system identification and, in case of health monitoring, damage detection/localization methods. This paper introduces a pre-processing approach that removes...... the harmonic part from the output signals directly in the time domain. The new method uses orthogonal projections of the harmonic realization of the signal onto the raw time series within the stochastic subspace framework. Proposed algorithm is tested on two experimental examples. First, an aluminum plate...... excited with both random white and periodic excitations. Second, a full-scale industrial case of a ferry excited by a random environmental load with harmonic interference from a rotating machinery on-board. In both cases the proposed method removes the harmonics from the structural responses while leaving...

  2. The Hungarian model project: Strengthening training for operational safety at Paks nuclear power plant

    Mautner Markhof, F.

    1998-01-01

    The Hungarian Model project (HMP) reflects the commitment to constant increase of safety and reliability of the NPP Paks, the Government of Hungary and the IAEA. It includes some of the most important nuclear power objectives of Paks NPP, namely the strengthening of NPP personnel training and competence through the application of international best practice, the systematic approach to training (SAT), for training operation and maintenance personnel; setting up a state of-the-art maintenance training center (MTC) at Paks and enhancing safety culture at Paks NPP. The IAEA supported implementation of the HMP through fellowships and scientific visits, expert missions, provision of hardware and software for SAT application, and supply od major new uncontaminated items of actual WWER equipment for the MTC

  3. New concept for condition management of plants as a result of the KUNTO project. New operations approach reduces costs

    McNiven, U.; Tamminen, L.

    1998-07-01

    IVO Generation Services Ltd. has carried out a project at the IVO Naantali power plant to develop the plants condition management. The project defines critical and monitored components for each system. In addition, recommendations for further action, investment proposals and suggestions for changes in maintenance and operations practices were supplied for the various systems in the plant. The systematic approach which was the result of the projects integrated into maintenance and operations practices where data collection and analysis is part of the routine. Up-to-date data is utilized in focusing maintenance and investments, in planning and reporting functions

  4. The success of 6-hour hospital discharge on patients having vaginal repair operations using a new conscious sedation technique.

    Hill, N; Gupta, A; Zakaryan, A; Morey, R

    2011-01-01

    Anterior and posterior repair are standard surgical techniques for treatment of vaginal prolapse. These procedures are performed traditionally under general anaesthetic or spinal anaesthetic and usually require overnight admission in the hospital. We describe our case series of 40 patients who underwent anterior (18/40), posterior (20/40) or combined repair (2/40) under local anaesthetic and conscious sedation (Remifentanyl). The majority (35/40) were performed in the day-case surgery unit and 95% patients were discharged within 6 hours of the operation, with no complications. All the patients were satisfied with the anaesthetic technique. We concluded that our technique of vaginal repair avoids the risk of general and spinal anaesthetic. The majority of operations can be performed as day cases with good patient satisfaction and without increasing risks to the patients. This technique has potential significant financial saving for the hospitals.

  5. Project Guarantee 1985. Repository for high-level radioactive waste: construction and operation

    Anon.

    1985-01-01

    An engineering project study aimed at demonstrating the feasibility of constructing a deep repository for high-level waste (Type C repository) has been carried out; the study is based on a model data-set representing typical geological and rock mechanical conditions as found outside the so-called Permocarboniferous basin in the regions under investigation by Nagra in Cantons Aargau, Schaffhausen, Solothurn and Zuerich. The repository is intended for disposal of high-level waste and any intermediate-level waste from re-processing in which the concentration of long-lived alpha-emitters exceeds the permissible limits set for a Type B repository. Final disposal of high-level waste is in subterranean, horizontally mined tunnels and of intermediate-level waste in underground vertical silos. The repository is intended to accomodate a total of around 6'000 HWL-cylinders (gross volume of around 1'200 m3) and around 10'000 m3 of intermediate-level waste. The total excavated volume is around 1'100'000 m3 and a construction time for the whole repository (up to the beginning of emplacement) of around 15 years is expected. For the estimated 50-year emplacement operations, a working team of around 60 people will be needed and a team of around 160 for the simultaneous tunnelling operations and auxiliary work. The project described in the present report permits the conclusion that construction of a repository for high-level radioactive waste and, if necessary, spent fuel-rods is feasible with present-day technology

  6. Project Guarantee 1985. Repository for low- and intermediate-level radioactive waste: construction and operation

    Anon.

    1985-01-01

    A constructional engineering project study aimed at clarification of the feasibility of a repository for low- and intermediate-level radioactive waste (type B repository) has been carried out; the study is based on a model data-set derived from the geological, rock mechanical and topographical characterictics of one of Nagra's planned exploration areas. Final storage is effected in subterranean rock caverns accessed by horizontal tunnel. The reception area also is sited below the surface. Storage is conceived in such a way that, after closure of the repository, maintenance and supervision can be dispensed with and a guarantee of high long-term safety can nevertheless be provided. The envisaged repository consists of an entry tunnel for road vehicles and a reception area with a series of caverns for receiving waste, for additional technical facilities and for the production of the concrete back-fill material. The connecting tunnel is serviced by a tunnel railway and the actual repository area consists of several storage caverns. The repository is intended to accomodate a total of 200'000 m3 of solidified low- and intermediate-level waste. Valanginian marl is assumed as the host rock, although it would also be basically possible to house the proposed installations in other host rocks. The excavated material will total around 1'000'000 m3. The construction time for the whole installation is estimated as about 7 years and a working team of around 30 people will be required for the estimated 60-year operational duration. The project described in the present report justifies the conclusion that construction of a repository for low-and intermediate-level radioactive waste is feasible with present-day technology. This conclusion takes into consideration quantitative and operational constraints as well as geological and hydrogeological data relevant to constructional engineering. The latter are derived from a model data-set based on a specific locality

  7. Virtual Reality: a way to prepare and optimize operations in decommissioning projects

    Chabal, Caroline; Soulabaille, Yves

    2016-01-01

    The CEA has operated numerous nuclear facilities to carry out R and D and define nuclear fuel life cycle processes since the 1950's. It must now manage the clean-up and dismantling of those which have reached the end of their lifetime. These high priority actions have led to the creation of a dismantling R and D division which provides innovative tools, including in-situ radiological characterization, remote handling and cutting, and intervention scenario simulation. The latter involves running defined scenarios and verifying their suitability for the environment. Simulation is an ideal means of visualizing and therefore better knowing highly radioactive environments where humans cannot enter, of testing different technical alternatives, and of training workers prior to interventions. This paper describes Virtual Reality (VR) uses on dismantling projects. A VR simulation can be defined as an interactive and immersive simulation that enables the user to interact with a computer-simulated environment. VR environments, mostly based on visual immersion displayed through stereoscopic devices, can also include additional sensory information, such as sound or touch. Our application, based on audio, tactile and visual immersion, provides a useful support to verify pre-defined scenarios and to design alternative solutions if necessary. Thanks to a stereoscopic visualization, users are immersed in a virtual world, where they can hear virtual sounds when there is a collision, and can manipulate virtual objects and touch them via a haptic interface. This article first describes the PRESAGE immersive room in Marcoule. Then, the data preparation is explained, especially the 3D model reconstruction and the simulation configuration (remote handling and radiological). Next, different VR uses on decommissioning projects are shown and illustrated by examples. The advantages of such technologies include their speed in testing, user-friendliness, reactivity and usefulness in the

  8. Decommissioning techniques for research reactors. Final report of a co-ordinated research project 1997-2001

    NONE

    2002-02-01

    In its international role, the IAEA is faced with a wide variety of national situations and different availability of technical, human and financial resources. While it is recognised that nuclear decommissioning is a mature industry in some developed countries, and may soon become a routine activity, the situation is by no means so clear in other countries. In addition, transfer of technologies and know-how from developed to developing countries is not a spontaneous, straightforward process, and will take time and considerable effort. As mandated by its own statute and Member States' requests, the IAEA continues to respond to its Member States by monitoring technological progress, ensuring development of safer and more efficient strategies and fostering international information exchange. Previous co-ordinated research projects (CRP) conducted respectively from 1984 to 1987, and from 1989 to 1993, investigated the overall domain of decommissioning. In those CRPs no distinction was made between decommissioning activities carried out at nuclear power plants, research reactors or nuclear fuel cycle facilities. With technological progress and experience gained, it became clear that decommissioning of research reactors had certain specific characteristics which needed a dedicated approach. In addition, a large number of research reactors reached a state of permanent shutdown in the 1990s and were candidates for prompt decommissioning. With the progressive ageing of research reactors, many more of these units will soon become redundant worldwide and require decommissioning. Within this context, a CRP on Decommissioning Techniques for Research Reactors was launched and conducted by the IAEA from 1997 to 2001 in order to prepare for eventual decommissioning. Concluding reports that summarized the work undertaken under the aegis of the CRP were presented at the third and final Research Co-ordination Meeting held in Kendal, United Kingdom, 14-18 May 2001, and are collected

  9. Decommissioning techniques for research reactors. Final report of a co-ordinated research project 1997-2001

    2002-02-01

    In its international role, the IAEA is faced with a wide variety of national situations and different availability of technical, human and financial resources. While it is recognised that nuclear decommissioning is a mature industry in some developed countries, and may soon become a routine activity, the situation is by no means so clear in other countries. In addition, transfer of technologies and know-how from developed to developing countries is not a spontaneous, straightforward process, and will take time and considerable effort. As mandated by its own statute and Member States' requests, the IAEA continues to respond to its Member States by monitoring technological progress, ensuring development of safer and more efficient strategies and fostering international information exchange. Previous co-ordinated research projects (CRP) conducted respectively from 1984 to 1987, and from 1989 to 1993, investigated the overall domain of decommissioning. In those CRPs no distinction was made between decommissioning activities carried out at nuclear power plants, research reactors or nuclear fuel cycle facilities. With technological progress and experience gained, it became clear that decommissioning of research reactors had certain specific characteristics which needed a dedicated approach. In addition, a large number of research reactors reached a state of permanent shutdown in the 1990s and were candidates for prompt decommissioning. With the progressive ageing of research reactors, many more of these units will soon become redundant worldwide and require decommissioning. Within this context, a CRP on Decommissioning Techniques for Research Reactors was launched and conducted by the IAEA from 1997 to 2001 in order to prepare for eventual decommissioning. Concluding reports that summarized the work undertaken under the aegis of the CRP were presented at the third and final Research Co-ordination Meeting held in Kendal, United Kingdom, 14-18 May 2001, and are collected

  10. The provision of Technical Co-operation: The model project for upgrading radiation protection infrastructure

    Barretto, P.M.C.

    2001-01-01

    The paper describes the IAEA's systematic effort to address the inadequate situation in many of its Member States with regard to radiation protection and safety. For this effort a special project was created and implemented in the past five years to create or strengthen existing radiation protection infrastructure in 52 countries where such infrastructure was non-existent or not appropriate for the type of practice involved. The implementation of this project focused on the development of qualified human resources, assistance for introduction of appropriate legislation and equipment for inspection and analysis. Workplans were tailored to the individual needs of each participating country and the elements of these workplans were grouped into five milestones -- regulatory framework, occupational exposure control, medical exposure control, public exposure control, and emergency preparedness and response capabilities. By the end of 2000 more than 70% of the participating countries had radiation protection laws promulgated and a regulatory authority established; 46% had regulations adopted and 42% had a system of notification, authorization and control of radiation sources operational. During the five years of implementation, 555 fellows received individual training, another 2278 participated in training courses, over 1000 expert missions were fielded and equipment worth about US $6 million was provided. The total cost was over US $17 million. (author)

  11. EOS: A project to investigate the design and construction of real-time distributed Embedded Operating Systems

    Campbell, R. H.; Essick, Ray B.; Johnston, Gary; Kenny, Kevin; Russo, Vince

    1987-01-01

    Project EOS is studying the problems of building adaptable real-time embedded operating systems for the scientific missions of NASA. Choices (A Class Hierarchical Open Interface for Custom Embedded Systems) is an operating system designed and built by Project EOS to address the following specific issues: the software architecture for adaptable embedded parallel operating systems, the achievement of high-performance and real-time operation, the simplification of interprocess communications, the isolation of operating system mechanisms from one another, and the separation of mechanisms from policy decisions. Choices is written in C++ and runs on a ten processor Encore Multimax. The system is intended for use in constructing specialized computer applications and research on advanced operating system features including fault tolerance and parallelism.

  12. Intuitionistic Trapezoidal Fuzzy Group Decision-Making Based on Prospect Choquet Integral Operator and Grey Projection Pursuit Dynamic Cluster

    Jiahang Yuan

    2017-01-01

    Full Text Available In consideration of the interaction among attributes and the influence of decision makers’ risk attitude, this paper proposes an intuitionistic trapezoidal fuzzy aggregation operator based on Choquet integral and prospect theory. With respect to a multiattribute group decision-making problem, the prospect value functions of intuitionistic trapezoidal fuzzy numbers are aggregated by the proposed operator; then a grey relation-projection pursuit dynamic cluster method is developed to obtain the ranking of alternatives; the firefly algorithm is used to optimize the objective function of projection for obtaining the best projection direction of grey correlation projection values, and the grey correlation projection values are evaluated, which are applied to classify, rank, and prefer the alternatives. Finally, an illustrative example is taken in the present study to make the proposed method comprehensible.

  13. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  14. Radiographic failure and rates of re-operation after acromioclavicular joint reconstruction: a comparison of surgical techniques.

    Spencer, H T; Hsu, L; Sodl, J; Arianjam, A; Yian, E H

    2016-04-01

    To compare radiographic failure and re-operation rates of anatomical coracoclavicular (CC) ligament reconstructional techniques with non-anatomical techniques after chronic high grade acromioclavicular (AC) joint injuries. We reviewed chronic AC joint reconstructions within a region-wide healthcare system to identify surgical technique, complications, radiographic failure and re-operations. Procedures fell into four categories: (1) modified Weaver-Dunn, (2) allograft fixed through coracoid and clavicular tunnels, (3) allograft loop coracoclavicular fixation, and (4) combined allograft loop and synthetic cortical button fixation. Among 167 patients (mean age 38.1 years, (standard deviation (sd) 14.7) treated at least a four week interval after injury, 154 had post-operative radiographs available for analysis. Radiographic failure occurred in 33/154 cases (21.4%), with the lowest rate in Technique 4 (2/42 4.8%, p = 0.001). Half the failures occurred by six weeks, and the Kaplan-Meier survivorship at 24 months was 94.4% (95% confidence interval (CI) 79.6 to 98.6) for Technique 4 and 69.9% (95% CI 59.4 to 78.3) for the other techniques when combined. In multivariable survival analysis, Technique 4 had better survival than other techniques (Hazard Ratio 0.162, 95% CI 0.039 to 0.068, p = 0.013). Among 155 patients with a minimum of six months post-operative insurance coverage, re-operation occurred in 9.7% (15 patients). However, in multivariable logistic regression, Technique 4 did not reach a statistically significant lower risk for re-operation (odds ratio 0.254, 95% CI 0.05 to 1.3, p = 0.11). In this retrospective series, anatomical CC ligament reconstruction using combined synthetic cortical button and allograft loop fixation had the lowest rate of radiographic failure. Anatomical coracoclavicular ligament reconstruction using combined synthetic cortical button and allograft loop fixation had the lowest rate of radiographic failure. ©2016 The British Editorial

  15. Exploring the Degree of Support by PMOs for New Project Management Techniques and Methods

    Lopez, Kathleen P.

    2012-01-01

    An organization tends to seek out the best set of practices in order to achieve project success. Many organizations are implementing a Project Management Office (PMO) to serve as a central post for organizing and disseminating best practices. The PMO responsibilities in part is to examine all practices, old and new, to best determine which…

  16. An Instructional Feedback Technique for Teaching Project Management Tools Aligned with PMBOK

    Gonçalves, Rafael Queiroz; von Wangenheim, Christiane Gresse; Hauck, Jean Carlo Rossa; Petri, Giani

    2017-01-01

    The management of contemporary software projects is unfeasible without the support of a Project Management (PM) tool. In order to enable the adoption of PM tools in practice, teaching its usage is important as part of computer education. Aiming at teaching PM tools, several approaches have been proposed, such as the development of educational PM…

  17. The technique of project activity: A new approach in Russian preschool.

    Veraksa N.E.

    2015-06-01

    Full Text Available Project activity has a long history of implementation in education (Kilpatrick, 1918. This article describes the approach to project activity that became widespread in preschool education in Russia in the late 1990s. This approach is based on the cultural-historical theory of Vygotsky (1978, Venger’s (1988 understanding of intellectual giftedness, as well as an understanding of project activity proposed by Leontiev (2000. At the heart of project activity lies children’s exploration of the space of possibilities — that is, their search for action options that correspond to their personal motives and express their individuality. The main features of project activity are the problem situation to be presented to the child; the subjectivity of all its participants, including teachers; and its nature, which includes its social context. Three main types of project activity are presented: research, creative, and normative; each has its own structure and value for children’s development. Examples of their implementation in preschool settings are provided. The impact of project activity on all its participants in preschool — children, teachers, parents — is addressed. The article shows the effectiveness of project activity for educational work with both intellectually gifted and normally developing children.

  18. Do Projects Really End Late? On the Shortcomings of the Classical Scheduling Techniques

    Ballesteros-Pérez, Pablo; Larsen, Graeme D.; González-Cruz, Maria C.

    2018-01-01

    Many engineering projects fail to meet their planned completion dates in real practice. This is a recurrent topic in the project management literature, with poor planning and controlling practices frequently cited among the most significant causes of delays. Unfortunately, hardly any attention has been paid to the fact that the classical…

  19. Towards a Comprehensive Valuation of Water Management Projects When Data Availability Is Incomplete—The Use of Benefit Transfer Techniques

    Michael Ahlheim

    2015-05-01

    Full Text Available In this paper we deal with the problem of missing data in environmental cost-benefit analysis. If government pursues the goal of maximizing social welfare, this implies that public funds should be allocated to those uses where they generate the highest net social benefit. This criterion makes it necessary to conduct cost-benefit analyses for public projects. While the assessment of project costs is typically rather straightforward, a comprehensive assessment of the project benefits is more complicated because one has to consider that also people living far away from the project site might benefit from that project. Neglecting these so-called passive use benefits would lead to a systematic undervaluation of environmental projects, thereby reducing their chances of being realized. A comprehensive cost-benefit analysis would, therefore, require benefit assessment studies in all areas where passive use values might occur. Obviously, this would be impossible. In this paper we show how the assessment of the social benefits from environmental projects can be enhanced even with an imperfect database by using benefit transfer techniques. This is also illustrated empirically using an example from Northwest China.

  20. Operational modal analysis on a VAWT in a large wind tunnel using stereo vision technique

    Najafi, Nadia; Paulsen, Uwe Schmidt

    2017-01-01

    This paper is about development and use of a research based stereo vision system for vibration and operational modal analysis on a parked, 1-kW, 3-bladed vertical axis wind turbine (VAWT), tested in a wind tunnel at high wind. Vibrations were explored experimentally by tracking small deflections of the markers on the structure with two cameras, and also numerically, to study structural vibrations in an overall objective to investigate challenges and to prove the capability of using stereo vision. Two high speed cameras provided displacement measurements at no wind speed interference. The displacement time series were obtained using a robust image processing algorithm and analyzed with data-driven stochastic subspace identification (DD-SSI) method. In addition of exploring structural behaviour, the VAWT testing gave us the possibility to study aerodynamic effects at Reynolds number of approximately 2 × 10"5. VAWT dynamics were simulated using HAWC2. The stereo vision results and HAWC2 simulations agree within 4% except for mode 3 and 4. The high aerodynamic damping of one of the blades, in flatwise motion, would explain the gap between those two modes from simulation and stereo vision. A set of conventional sensors, such as accelerometers and strain gauges, are also measuring rotor vibration during the experiment. The spectral analysis of the output signals of the conventional sensors agrees the stereo vision results within 4% except for mode 4 which is due to the inaccuracy of spectral analysis in picking very closely spaced modes. Finally, the uncertainty of the 3D displacement measurement was evaluated by applying a generalized method based on the law of error propagation, for a linear camera model of the stereo vision system. - Highlights: • The stereo vision technique is used to track deflections on a VAWT in the wind tunnel. • OMA is applied on displacement time series to study the dynamic behaviour of the VAWT. • Stereo vision results enabled us to

  1. Predicting core losses and efficiency of SRM in continuous current mode of operation using improved analytical technique

    Parsapour, Amir; Dehkordi, Behzad Mirzaeian; Moallem, Mehdi

    2015-01-01

    In applications in which the high torque per ampere at low speed and rated power at high speed are required, the continuous current method is the best solution. However, there is no report on calculating the core loss of SRM in continuous current mode of operation. Efficiency and iron loss calculation which are complex tasks in case of conventional mode of operation is even more involved in continuous current mode of operation. In this paper, the Switched Reluctance Motor (SRM) is modeled using finite element method and core loss and copper loss of SRM in discontinuous and continuous current modes of operation are calculated using improved analytical techniques to include the minor loop losses in continuous current mode of operation. Motor efficiency versus speed in both operation modes is obtained and compared. - Highlights: • Continuous current method for Switched Reluctance Motor (SRM) is explained. • An improved analytical technique is presented for SRM core loss calculation. • SRM losses in discontinuous and continuous current operation modes are presented. • Effect of mutual inductances on SRM performance is investigated

  2. Predicting core losses and efficiency of SRM in continuous current mode of operation using improved analytical technique

    Parsapour, Amir, E-mail: amirparsapour@gmail.com [Department of Electrical Engineering, University of Isfahan, Isfahan (Iran, Islamic Republic of); Dehkordi, Behzad Mirzaeian, E-mail: mirzaeian@eng.ui.ac.ir [Department of Electrical Engineering, University of Isfahan, Isfahan (Iran, Islamic Republic of); Moallem, Mehdi, E-mail: moallem@cc.iut.ac.ir [Department of Electrical Engineering, Isfahan University of Technology, Isfahan (Iran, Islamic Republic of)

    2015-03-15

    In applications in which the high torque per ampere at low speed and rated power at high speed are required, the continuous current method is the best solution. However, there is no report on calculating the core loss of SRM in continuous current mode of operation. Efficiency and iron loss calculation which are complex tasks in case of conventional mode of operation is even more involved in continuous current mode of operation. In this paper, the Switched Reluctance Motor (SRM) is modeled using finite element method and core loss and copper loss of SRM in discontinuous and continuous current modes of operation are calculated using improved analytical techniques to include the minor loop losses in continuous current mode of operation. Motor efficiency versus speed in both operation modes is obtained and compared. - Highlights: • Continuous current method for Switched Reluctance Motor (SRM) is explained. • An improved analytical technique is presented for SRM core loss calculation. • SRM losses in discontinuous and continuous current operation modes are presented. • Effect of mutual inductances on SRM performance is investigated.

  3. Ultrascalable Techniques Applied to the Global Intelligence Community Information Awareness Common Operating Picture (IA COP)

    Valdes, Alfonso; Kadte, Jim

    2005-01-01

    The focus of this research is to develop detection, correlation, and representation approaches to address the needs of the Intelligence Community Information Awareness Common Operating Picture (IA COP...

  4. Correction method of nonlinearity due to logarithm operation for X-ray CT projection data with noise in photon-starved state

    Iwamoto, Shin-ichiro; Shiozaki, Akira

    2007-01-01

    In the acquisition of projection data of X-ray CT, logarithm operation is indispensable. But noise distribution is nonlinearly projected by the logarithm operation, and this deteriorates the precision of CT number. This influence becomes particularly remarkable when only a few photons are caught with a detector. It generates a strong streak artifact (SA) in a reconstructed image. Previously we have clarified the influence of the nonlinearity by statistical analysis and proposed a correction method for such nonlinearity. However, there is a problem that the compensation for clamp processing cannot be performed and that the suppression of SA is not enough in photon shortage state. In this paper, we propose a new technique for correcting the nonlinearity due to logarithm operation for noisy data by combining the previously presented method and an adaptive filtering method. The technique performs an adaptive filtering only when the number of captured photons is very few. Moreover we quantitatively evaluate the influence of noise on the reconstructed image in the proposed method by the experiment using numerical phantoms. The experimental results show that there is less influence on spatial resolution despite suppressing SA effectively and that CT number are hardly dependent on the number of the incident photons. (author)

  5. Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)

    Gilbert, J.L.

    1998-01-01

    The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454

  6. Connected Operators : A review of region-based morphological image processing techniques

    Salembier, Philippe; Wilkinson, Michael H. F.

    2009-01-01

    Connected operators are filtering tools that act by merging elementary regions called flat zones. Connecting operators cannot create new contours nor modify their position. Therefore, they have very good contour preservation properties and are capable of both low-level filtering and higher-level

  7. Connected Operators : A review of region-based morphological image processing techniques

    Salembier, Philippe; Wilkinson, Michael H. F.

    Connected operators are filtering tools that act by merging elementary regions called flat zones. Connecting operators cannot create new contours nor modify their position. Therefore, they have very good contour preservation properties and are capable of both low-level filtering and higher-level

  8. Energy projects in Iceland – Advancing the case for the use of economic valuation techniques to evaluate environmental impacts

    Cook, David; Davíðsdóttir, Brynhildur; Kristófersson, Daði Már

    2016-01-01

    Decision-making in Iceland has occurred without reference to economic valuations of the environmental impacts of energy projects. Environmental Impact Assessments, a legal requirement for nearly all energy projects in Iceland since 1994, have played an important role in identifying the environmental impacts of energy projects, and proposing mitigation measures. However, a purely qualitative description of environmental impacts is insufficient to ensure that they are accounted for equivalently with all of the other costs and benefits of a proposed project. Instead, as monetary information concerning the welfare gains or losses of proposed projects is not currently required to be provided to the licensing body, Orkustofnun, there is the potential for sub-optimal decision-making to occur. As this paper sets out, a broad variety of non-market valuation techniques already exist and could be applied to estimate the value of environmental benefits sacrificed to accommodate such developments. These methods and their outcomes could be incorporated within mandatory cost-benefit assessments for proposed Icelandic energy projects, communicating an estimate of the full welfare implications of approvals to decision-makers and the public alike, and fulfilling an OECD demand for the country to commence such processes. - Highlights: •Current risk of sub-optimal decision-making by licensing body, Orkustofnun. •OECD call for monetary valuations of environmental impacts linked to Icelandic energy projects. •Lessons to be learned from US regulatory approach to advance cost-benefit assessment practice in Iceland. •Practice of conducting non-market valuation techniques limited in Iceland, but now growing.

  9. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  10. Development of the operator training system using computer graphics. Pt. 1. Defining the system configuration and developing basic techniques

    Takana, Kenchi; Sasou, Kunihide; Sano, Toshiaki; Suzuki, Koichi; Noji, Kunio

    2001-01-01

    Efficient and concurrent operator training seems to be crucial in near future because of an increase in operators to be trained due to generation alternations. Ever developed Man -Machine-Simulator (MMS) has several merits: (1) Operators' cognitive and behavioral activities among team in emergency could be simulated based on the concurrent mental model; (2) Simulated scenarios could be expanded to multiple malfunctions events, to all of which procedures could not be stipulated previously, (3) Standard behavior in coping with anomalies including communication and operations could be presented. This paper describes the development of an operator training system by applying this MMS. Three dimensional computer graphics (3D-CG) was adopted for improving the training effects and attracting operators' interest by visually presenting realistic operating team behavior in the main control room. Towards the completion of the operator training system, following designs of system configuration and developments of several basic techniques were availed: (1) Imaging the utilization of the operator training system, functions to be equipped and system configurations for realizing functions were determined. And three of scenarios were chosen in order to appeal the merits of the MMS and to raise training effects. (2) Knowledge base was completed to execute simulations. And connection between operator team model and plant simulator, that is the 2nd generation type simulator of the BTC -4, was executed to obtain simulation results (time sequential log data of plant dynamics and operating team behavior). (3) Operator's actions seen in VCR tapes in real training were classified for eighteen kinds of fundamental categories and those fundamental actions were modeled on 3D-CG using the People Shop software. The 3D-CG of main control panel was prepared using Multi Gen software. (author)

  11. Intelligent Heuristic Techniques for the Optimization of the Transshipment and Storage Operations at Maritime Container Terminals

    Christopher Expósito-Izquierdo

    2017-02-01

    Full Text Available This paper summarizes the main contributions of the Ph.D. thesis of Christopher Exp\\'osito-Izquierdo. This thesis seeks to develop a wide set of intelligent heuristic and meta-heuristic algorithms aimed at solving some of the most highlighted optimization problems associated with the transshipment and storage of containers at conventional maritime container terminals. Under the premise that no optimization technique can have a better performance than any other technique under all possible assumptions, the main point of interest in the domain of maritime logistics is to propose optimization techniques superior in terms of effectiveness and computational efficiency to previous proposals found in the scientific literature when solving individual optimization problems under realistic scenarios. Simultaneously, these optimization techniques should be enough competitive to be potentially implemented in practice. }}

  12. The application of artificial intelligent techniques to accelerator operations at McMaster University

    Poehlman, W. F. S.; Garland, Wm. J.; Stark, J. W.

    1993-06-01

    In an era of downsizing and a limited pool of skilled accelerator personnel from which to draw replacements for an aging workforce, the impetus to integrate intelligent computer automation into the accelerator operator's repertoire is strong. However, successful deployment of an "Operator's Companion" is not trivial. Both graphical and human factors need to be recognized as critical areas that require extra care when formulating the Companion. They include interactive graphical user's interface that mimics, for the operator, familiar accelerator controls; knowledge of acquisition phases during development must acknowledge the expert's mental model of machine operation; and automated operations must be seen as improvements to the operator's environment rather than threats of ultimate replacement. Experiences with the PACES Accelerator Operator Companion developed at two sites over the past three years are related and graphical examples are given. The scale of the work involves multi-computer control of various start-up/shutdown and tuning procedures for Model FN and KN Van de Graaff accelerators. The response from licensing agencies has been encouraging.

  13. The application of artificial intelligent techniques to accelerator operations at McMaster University

    Poehlman, W.F.S.; Garland, W.J.; Stark, J.W.

    1993-01-01

    In an era of downsizing and a limited pool of skilled accelerator personnel from which to draw replacements for an aging workforce, the impetus to integrate intelligent computer automation into the accelerator operator's repertoire is strong. However, successful deployment of an 'Operator's Companion' is not trivial. Both graphical and human factors need to be recognized as critical areas that require extra care when formulating the Companion. They include interactive graphical user's interface that mimics, for the operator, familiar accelerator controls; knowledge of acquisition phases during development must acknowledge the expert's mental model of machine operation; and automated operations must be seen as improvements to the operator's environment rather than threats of ultimate replacement. Experiences with the PACES Accelerator Operator Companion developed at two sites over the past three years are related and graphical examples are given. The scale of the work involves multi-computer control of various start-up/shutdown and tuning procedures for Model FN and KN Van de Graaff accelerators. The response from licensing agencies has been encouraging. (orig.)

  14. Techniques for controlling air pollution from the operation of nuclear facilities. Report of a panel

    1966-01-01

    This manual is provided for the guidance of those persons or authorities who are responsible for the organization, control and operation of ventilation systems and air-cleaning installations in nuclear establishments. It is intended to generalize about existing experience in the operation of such systems at nuclear facilities including reactors and laboratories for production, use and handling of radionuclides and other toxic materials. This manual will provide designers and operators of nuclear facilities in which ventilation and air-cleaning systems are used with the factors which have to be considered to create safe working conditions inside facilities and without polluting the atmosphere or the environment to a hazardous level.

  15. A combined technique using SEM and TOPSIS for the commercialization capability of R&D project evaluation

    Charttirot Karaveg

    2015-07-01

    Full Text Available There is a high risk of R&D based innovation being commercialized, especially in the innovation transfer process which is a concern to many entrepreneurs and researchers. The purpose of this research is to develop the criteria of R&D commercialization capability and to propose a combined technique of Structural Equation Modelling (SEM and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS for R&D project evaluation. The research utilized a mixed-method approach. The first phase comprised a qualitative study on commercialization criteria development though the survey research of 272 successful entrepreneurs and researchers in all industrial sectors in Thailand. The data was collected with a structured questionnaire and analyzed by SEM. The second phase was involved with SEM-TOPSIS technique development and a case study of 45 R&D projects in research institutes and incubators for technique validation. The research results reveal that there were six criteria for R&D project commercialization capability, these are arranged according to the significance; marketing, technology, finance, non-financial impact, intellectual property, and human resource. The holistic criteria is presented in decreasing order on the ambiguous subjectivity of the fuzzy-expert system, to help with effectively funding R&D and to prevent a resource meltdown. This study applies SEM to the relative weighting of hierarchical criteria. The TOPSIS approach is employed to rank the alternative performance. An integrated SEM-TOPSIS is proposed for the first time and applied to present R&D projects shown to be effective and feasible in evaluating R&D commercialization capacity.

  16. Operational report, basics of the preliminary project for reconstruction of the RA reactor ventilation system

    Martinc, R.

    1982-01-01

    This report presents the summary of results needed for designing the reconstruction of the RA reactor ventilation system. The final complete report will published later, including results of possible additional analyses according to the needs of main detailed project. Due to the size of the facility the need of filters for particulates is expected in systems V-1 and V-2, as well as revision of the system V-4. Adsorption filters are not needed in case of operation under regular working conditions. It would be favorable, but not indispensable to construct an adsorption filter that could be used occasionally at the input of V-2 system under the upper water shielding. This filter would be switched on when dehermetization of the reactor is planned and increased radioactivity is indicated in the gas system or experimental space of the RA reactor as well as in case of fuel elements failure. The aim of applying filters is shortening the time these elements would spend in the hermetized reactor i.e. their fast removal from the reactor. It is indispensable to build-in 'emergency' highly efficient adsorption filters in the V-2 system which would be switched on in case of accidents that would cause fuel elements meltdown (with simultaneous accident dehermetization of the heavy water system) [sr

  17. ICDE project report: collection and analysis of common-cause failures of motor operated valves

    2001-07-01

    This report documents a study performed on the set of common cause failures (CCF) of motor operated valves (MOV). The data studied here were derived from the International CCF Data Exchange (ICDE) database, to which several countries have submitted CCF event data. The purpose of the ICDE is to allow multiple countries to collaborate and exchange CCF data to enhance the quality of risk analyses that include CCF modeling. Because CCF events are typically rare events, most countries do not experience enough CCF events to perform meaningful analyses. Data combined from several countries, however, yields sufficient data for more rigorous analyses. This report is the result of an in-depth review of the MOV events and presents several insights about them. The objective of this document is to look beyond the CCF parameter estimates that can be obtained from the CCF data, to gain further understanding of why CCF events occur and what measures may be taken to prevent, or at least mitigate the effect of MOV CCF events. The report presents details of the ICDE project, a quantitative presentation of the MOV events, and a discussion of some engineering aspects of the events. (authors)

  18. The need of operational paradigms for frailty in older persons: the SPRINTT project.

    Cesari, Matteo; Marzetti, Emanuele; Calvani, Riccardo; Vellas, Bruno; Bernabei, Roberto; Bordes, Philippe; Roubenoff, Ronenn; Landi, Francesco; Cherubini, Antonio

    2017-02-01

    The exploration of frailty as a pre-disability geriatric condition represents one of the most promising research arenas of modern medicine. Frailty is today indicated as a paradigmatic condition around which the traditional healthcare systems might be re-shaped and optimized in order to address the complexities and peculiarities of elders. Unfortunately, the lack of consensus around a single operational definition has limited the clinical implementation of frailty in clinical practice. In these last years, growing attention (even beyond the traditional boundaries of geriatric medicine) has been given to physical performance measures. These instruments have shown to be predictive of negative health-related events and able to support an accurate estimation of the "biological age" in late life. The strong construct of physical performance measures also makes them particularly suitable for the assessment of the frailty status. Furthermore, the adoption of physical performance measures may help render the frailty condition more organ-specific (i.e., centred on the skeletal muscle quality) and less heterogeneous than currently perceived. The translation of the frailty concept by means of physical performance measures implicitly represents an attempt to go beyond traditional paradigms. In this context, the recently funded "Sarcopenia and Physical fRailty IN older people: multi-componenT Treatment strategies" (SPRINTT) project (largely based on such a novel approach) may indeed fill an important gap in the field and provide key insights for counteracting the disabling cascade in the elderly.

  19. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    2017-12-01

    VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT TECHNIQUES FOR DOD PROGRAMS THAT DO NOT MEET DOD POLICY THRESHOLDS December 2017 By: Randy Schneider...Joint applied project 4. TITLE AND SUBTITLE AN ANALYSIS OF THE BENEFITS AND APPLICATION OF EARNED VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT ...performance reporting. The immediate objective of this research project was to examine the question: Can the application of EVM-Lite project management

  20. The SISMA Project: A pre-operative seismic hazard monitoring system.

    Massimiliano Chersich, M. C.; Amodio, A. A. Angelo; Francia, A. F. Andrea; Sparpaglione, C. S. Claudio

    2009-04-01

    Galileian Plus is currently leading the development, in collaboration with several Italian Universities, of the SISMA (Seismic Information System for Monitoring and Alert) Pilot Project financed by the Italian Space Agency. The system is devoted to the continuous monitoring of the seismic risk and is addressed to support the Italian Civil Protection decisional process. Completion of the Pilot Project is planned at the beginning of 2010. Main scientific paradigm of SISMA is an innovative deterministic approach integrating geophysical models, geodesy and active tectonics. This paper will give a general overview of project along with its progress status and a particular focus will be put on the architectural design details and to the software implementation choices. SISMA is built on top of a software infrastructure developed by Galileian Plus to integrate the scientific programs devoted to the update of seismic risk maps. The main characteristics of the system may be resumed as follow: automatic download of input data; integration of scientific programs; definition and scheduling of chains of processes; monitoring and control of the system through a graphical user interface (GUI); compatibility of the products with ESRI ArcGIS, by mean of post-processing conversion. a) automatic download of input data SISMA needs input data such as GNSS observations, updated seismic catalogue, SAR satellites orbits, etc. that are periodically updated and made available from remote servers through FTP and HTTP. This task is accomplished by a dedicated user configurable component. b) integration of scientific programs SISMA integrates many scientific programs written in different languages (Fortran, C, C++, Perl and Bash) and running into different operating systems. This design requirements lead to the development of a distributed system which is platform independent and is able to run any terminal-based program following few simple predefined rules. c) definition and scheduling of

  1. Project planning and scheduling techniques for the CANDU programme - an overview

    Wong, P.T.; Sebastian, P.R.

    1978-01-01

    The energy crisis and higher costs have imposed the need for tighter control of completion time for the construction of CANDU nuclear power plants. System procedures and techniques to meet this challenge are described

  2. Report of the project ARCAL XLIII: Paraguay: industrial application of tracer techniques and nuclear control systems

    Acosta Cabello, Rodolfo

    2000-12-01

    Paraguay needs to improve the productivity in several service industries. Main interest has been devoted to introducing new alternative techniques for the evaluation of the processes of water treatment plants for human consumption and waste waters [es

  3. Three-dimensional trace measurements for fast-moving objects using binary-encoded fringe projection techniques.

    Su, Wei-Hung; Kuo, Cho-Yo; Kao, Fu-Jen

    2014-08-20

    A fringe projection technique to trace the shape of a fast-moving object is proposed. A binary-encoded fringe pattern is illuminated by a strobe lamp and then projected onto the moving object at a sequence of time. Phases of the projected fringes obtained from the sequent measurements are extracted by the Fourier transform method. Unwrapping is then performed with reference to the binary-encoded fringe pattern. Even though the inspected object is colorful, fringe orders can be identified. A stream of profiles is therefore retrieved from the sequent unwrapped phases. This makes it possible to analyze physical properties of the dynamic objects. Advantages of the binary-encoded fringe pattern for phase unwrapping also include (1) reliable performance for colorful objects, spatially isolated objects, and surfaces with large depth discontinuities; (2) unwrapped errors only confined in a local area; and (3) low computation cost.

  4. Improving image quality in Electrical Impedance Tomography (EIT using Projection Error Propagation-based Regularization (PEPR technique: A simulation study

    Tushar Kanti Bera

    2011-03-01

    Full Text Available A Projection Error Propagation-based Regularization (PEPR method is proposed and the reconstructed image quality is improved in Electrical Impedance Tomography (EIT. A projection error is produced due to the misfit of the calculated and measured data in the reconstruction process. The variation of the projection error is integrated with response matrix in each iterations and the reconstruction is carried out in EIDORS. The PEPR method is studied with the simulated boundary data for different inhomogeneity geometries. Simulated results demonstrate that the PEPR technique improves image reconstruction precision in EIDORS and hence it can be successfully implemented to increase the reconstruction accuracy in EIT.>doi:10.5617/jeb.158 J Electr Bioimp, vol. 2, pp. 2-12, 2011

  5. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  6. Design and operating technique for ventilating system of irradiated materials examination facility

    Hwang, Yong Hwa; Hong, Kwon Pyo; Eom, Sung Ho

    1999-08-01

    Ventilation and air filtering system is installed at IMEF to maintain optimized operating condition of the facility by keeping different negative pressure condition depending on contamination level in the IMEF due to its treatment of radioactive materials. Inspection on each system, air flow measurement, filter leak test and other related test are periodically performed as the performance test for increasing operational efficiency and safety. (Author). 16 refs., 21 tabs., 9 figs

  7. The development of human behavior analysis techniques - A study on knowledge representation methods for operator cognitive model

    Lee, Jung Woon; Park, Young Tack [Soongsil University, Seoul (Korea, Republic of)

    1996-07-01

    The main objective of this project is modeling of human operator in a main control room of Nuclear Power Plant. For this purpose, we carried out research on knowledge representation and inference method based on Rasmussen`s decision ladder structure. And we have developed SACOM(Simulation= Analyzer with a Cognitive Operator Model) using G2 shell on Sun workstations. SACOM consists of Operator Model, Interaction Analyzer, Situation Generator. Cognitive model aims to build a more detailed model of human operators in an effective way. SACOM is designed to model knowledge-based behavior of human operators more easily. The followings are main research topics carried out this year. First, in order to model knowledge-based behavior of human operators, more detailed scenarios are constructed. And, knowledge representation and inference methods are developed to support the scenarios. Second, meta knowledge structures are studied to support human operators 4 types of diagnoses. This work includes a study on meta and scheduler knowledge structures for generate-and-test, topographic, decision tree and case-based approaches. Third, domain knowledge structure are improved to support meta knowledge. Especially, domain knowledge structures are developed to model topographic diagnosis model. Fourth, more applicable interaction analyzer and situation generator are designed and implemented. The new version is implemented in G2 on Sun workstations. 35 refs., 49 figs. (author)

  8. Intercomparison and validation of operational coastal-scale models, the experience of the project MOMAR.

    Brandini, C.; Coudray, S.; Taddei, S.; Fattorini, M.; Costanza, L.; Lapucci, C.; Poulain, P.; Gerin, R.; Ortolani, A.; Gozzini, B.

    2012-04-01

    The need for regional governments to implement operational systems for the sustainable management of coastal waters, in order to meet the requirements imposed by legislation (e.g. EU directives such as WFD, MSFD, BD and relevant national legislation) often lead to the implementation of coastal measurement networks and to the construction of computational models that surround and describe parts of regional seas without falling in the classic definition of regional/coastal models. Although these operational models may be structured to cover parts of different oceanographic basins, they can have considerable advantages and highlight relevant issues, such as the role of narrow channels, straits and islands in coastal circulation, as both in physical and biogeochemical processes such as in the exchanges of water masses among basins. Two models of this type were made in the context of cross-border European project MOMAR: an operational model of the Tuscan Archipelago sea and one around the Corsica coastal waters, which are both located between the Tyrrhenian and the Algerian-Ligurian-Provençal basins. Although these two models were based on different computer codes (MARS3D and ROMS), they have several elements in common, such as a 400 m resolution, boundary conditions from the same "father" model, and an important area of overlap, the Corsica channel, which has a key role in the exchange of water masses between the two oceanographic basins. In this work we present the results of the comparison of these two ocean forecasting systems in response to different weather and oceanographic forcing. In particular, we discuss aspects related to the validation of the two systems, and a systematic comparison between the forecast/hindcast based on such hydrodynamic models, as regards to both operational models available at larger scale, both to in-situ measurements made by fixed or mobile platforms. In this context we will also present the results of two oceanographic cruises in the

  9. Report of the first research co-ordination meeting under co-ordinated research project on 'In situ applications of XRF techniques'

    2001-03-01

    X-ray fluorescence is a well-established analytical technique widely used in industrial and research applications for materials characterisation. However, a relatively recent development has been the availability of portable instrumentation, which can be used for both the direct in situ non-destructive analysis of samples, and also is readily transportable to field sites for use in a 'mobile laboratory' style of operation. In situ analyses using the XRF technique can make an essential contribution to a wide range of projects, including: - Analysis of soils, particularly in the assessment of agricultural land and contaminated land - Sorting scrap metal alloys and plastics to increase the value of recyclable materials - Geochemical mapping and exploration to locate mineralisation deposits - Environmental monitoring related to air pollution studies and contamination of the work - The on-line control of industrial processes for the production of raw materials - Archaeological studies and the classification of artefacts, the restoration of sculptures, paintings and other objects of cultural heritage. - In situ geochemical studies on Mars, including the 1997 NASA Pathfinder mission and the forthcoming European Space Agency Mars Express mission, which includes the In these applications, the major advantages of field-portable X-ray fluorescence (FPXRF) spectrometry include: on-site immediate availability of analytical results, non-destructive analysis, a multielement capability, speed of operation and access to valuable/unique samples that otherwise would be unavailable for chemical analysis. The CRP on 'In situ applications of XRF techniques' is one element of the project on Nuclear Instruments for Specific Applications the major objective of which is to assist Member States in the development of nuclear instruments and software for special applications, such as the characterisation of materials. An overall objective of this CRP is to assist laboratories in Member States

  10. Oceanic gamefish/Skylab project field operating plan for operations 4, 5 August. [in Gulf of Mexico

    1973-01-01

    The operation plans are presented for the oceanic Gamefish/Skylab Experiment 240, which was conducted to obtain fish catch data for the northeast area of the Gulf of Mexico. The plans for surface measurements, aerial observations, and communications are included.

  11. Oncoplastic round block technique has comparable operative parameters as standard wide local excision: a matched case-control study.

    Lim, Geok-Hoon; Allen, John Carson; Ng, Ruey Pyng

    2017-08-01

    Although oncoplastic breast surgery is used to resect larger tumors with lower re-excision rates compared to standard wide local excision (sWLE), criticisms of oncoplastic surgery include a longer-albeit, well concealed-scar, longer operating time and hospital stay, and increased risk of complications. Round block technique has been reported to be very suitable for patients with relatively smaller breasts and minimal ptosis. We aim to determine if round block technique will result in operative parameters comparable with sWLE. Breast cancer patients who underwent a round block procedure from 1st May 2014 to 31st January 2016 were included in the study. These patients were then matched for the type of axillary procedure, on a one to one basis, with breast cancer patients who had undergone sWLE from 1st August 2011 to 31st January 2016. The operative parameters between the 2 groups were compared. 22 patients were included in the study. Patient demographics and histologic parameters were similar in the 2 groups. No complications were reported in either group. The mean operating time was 122 and 114 minutes in the round block and sWLE groups, respectively (P=0.64). Length of stay was similar in the 2 groups (P=0.11). Round block patients had better cosmesis and lower re-excision rates. A higher rate of recurrence was observed in the sWLE group. The round block technique has comparable operative parameters to sWLE with no evidence of increased complications. Lower re-excision rate and better cosmesis were observed in the round block patients suggesting that the round block technique is not only comparable in general, but may have advantages to sWLE in selected cases.

  12. Recent developments of the projected shell model based on many-body techniques

    Sun Yang

    2015-01-01

    Full Text Available Recent developments of the projected shell model (PSM are summarized. Firstly, by using the Pfaffian algorithm, the multi-quasiparticle configuration space is expanded to include 6-quasiparticle states. The yrast band of 166Hf at very high spins is studied as an example, where the observed third back-bending in the moment of inertia is well reproduced and explained. Secondly, an angular-momentum projected generate coordinate method is developed based on PSM. The evolution of the low-lying states, including the second 0+ state, of the soft Gd, Dy, and Er isotopes to the well-deformed ones is calculated, and compared with experimental data.

  13. 75 FR 70226 - Mackay Bar Corporation; Notice of Authorization for Continued Project Operation

    2010-11-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3041-004] Mackay Bar... Mackay Bar Corporation, licensee for the Hettinger Hydroelectric Project, filed an Application to..., notice is hereby given that an annual license for Project No. 3041 is issued to the Mackay Bar...

  14. TCV software test and validation tools and technique. [Terminal Configured Vehicle program for commercial transport aircraft operation

    Straeter, T. A.; Williams, J. R.

    1976-01-01

    The paper describes techniques for testing and validating software for the TCV (Terminal Configured Vehicle) program which is intended to solve problems associated with operating a commercial transport aircraft in the terminal area. The TCV research test bed is a Boeing 737 specially configured with digital computer systems to carry out automatic navigation, guidance, flight controls, and electronic displays research. The techniques developed for time and cost reduction include automatic documentation aids, an automatic software configuration, and an all software generation and validation system.

  15. Objective Classification of Rainfall in Northern Europe for Online Operation of Urban Water Systems Based on Clustering Techniques

    Löwe, Roland; Madsen, Henrik; McSharry, Patrick

    2016-01-01

    operators to change modes of control of their facilities. A k-means clustering technique was applied to group events retrospectively and was able to distinguish events with clearly different temporal and spatial correlation properties. For online applications, techniques based on k-means clustering...... and quadratic discriminant analysis both provided a fast and reliable identification of rain events of "high" variability, while the k-means provided the smallest number of rain events falsely identified as being of "high" variability (false hits). A simple classification method based on a threshold...

  16. Soft X-ray characterization technique for Li batteries under operating conditions

    Petersburg, Cole F.; Daniel, Robert C.; Alamgir, Faisal M. [Georgia Inst. of Technology, Atlanta, GA (United States). School of Materials Science and Engineering; Jaye, Cherno; Fischer, Daniel A. [National Inst. of Standards and Technology, Gaithersburg, MD (United States). Ceramics Div.

    2009-09-15

    O K-edge and Co L-edge near-edge X-ray absorption fine structure has been used to examine the cathode of an intact solid-state lithium ion battery. The novel technique allowed for the simultaneous acquisition of partial electron yield and fluorescence yield data during the first charge cycle of a LiCoO{sub 2}-based battery below the intercalation voltage. The chemical environments of oxygen and cobalt at the surface are shown to differ chemically from those in the bulk. The present design enables a wide variety of in situ spectroscopies, microscopies and scattering techniques. (orig.)

  17. Soft X-ray characterization technique for Li batteries under operating conditions

    Petersburg, Cole F.; Daniel, Robert C.; Alamgir, Faisal M.; Jaye, Cherno; Fischer, Daniel A.

    2009-01-01

    O K-edge and Co L-edge near-edge X-ray absorption fine structure has been used to examine the cathode of an intact solid-state lithium ion battery. The novel technique allowed for the simultaneous acquisition of partial electron yield and fluorescence yield data during the first charge cycle of a LiCoO 2 -based battery below the intercalation voltage. The chemical environments of oxygen and cobalt at the surface are shown to differ chemically from those in the bulk. The present design enables a wide variety of in situ spectroscopies, microscopies and scattering techniques. (orig.)

  18. Soft X-ray characterization technique for Li batteries under operating conditions.

    Petersburg, Cole F; Daniel, Robert C; Jaye, Cherno; Fischer, Daniel A; Alamgir, Faisal M

    2009-09-01

    O K-edge and Co L-edge near-edge X-ray absorption fine structure has been used to examine the cathode of an intact solid-state lithium ion battery. The novel technique allowed for the simultaneous acquisition of partial electron yield and fluorescence yield data during the first charge cycle of a LiCoO(2)-based battery below the intercalation voltage. The chemical environments of oxygen and cobalt at the surface are shown to differ chemically from those in the bulk. The present design enables a wide variety of in situ spectroscopies, microscopies and scattering techniques.

  19. Techniques for incorporating operator expertise into intelligent decision aids and training

    Blackman, H.S.; Nelson, W.R.

    1988-01-01

    An experiment is presented that was designed to investigate the use of protocol analysis, during task performance, as a technique for knowledge engineering that provides a direct tie between knowledge and performance. The technique is described and problem solving strategies are presented that were found to correlate with optimal performance. The results indicate that protocol analysis adds a dimension to the more standard knowledge engineering approaches by providing a more complete picture of the expert's knowledge and a performance yardstick to determine the most optimal problem solving strategies. Implications for the developers of expert systems and training programs are discussed. (author)

  20. Characterization of ceramics and semiconductors using nuclear techniques. Final report of a co-ordinated research project

    NONE

    1999-03-01

    With the aim of promoting research and facilitating more extensive application of nuclear techniques for material development, the IAEA established in 1994 a Co-ordinated Research Project (CRP) on Characterization of Ceramics and Semiconductors using Nuclear Techniques. This publication reviews and summarizes recent developments in this field and includes an assessment of the current status and trends in nuclear techniques in characterization of inorganic materials of technological importance. The TECDOC presents new achievements on ceramic superconductor behaviour under neutron induced defects, optimization of structure of mineral gels,m low temperature preparation of fine particles of ferrites, crystal luminescence of ceramic composites with improved plastic properties, thin film defects and detoxification of asbestos. The investigation of chemical composition, phase transitions and magnetic properties of ferrites by Moessbauer spectroscopy is largely developed. The document includes 18 individual contributions, each of them has been indexed and provided with an abstract Refs, figs, tabs