WorldWideScience

Sample records for projected federal system

  1. The Earth System Grid Federation (ESGF) Project

    Science.gov (United States)

    Carenton-Madiec, Nicolas; Denvil, Sébastien; Greenslade, Mark

    2015-04-01

    The Earth System Grid Federation (ESGF) Peer-to-Peer (P2P) enterprise system is a collaboration that develops, deploys and maintains software infrastructure for the management, dissemination, and analysis of model output and observational data. ESGF's primary goal is to facilitate advancements in Earth System Science. It is an interagency and international effort led by the US Department of Energy (DOE), and co-funded by National Aeronautics and Space Administration (NASA), National Oceanic and Atmospheric Administration (NOAA), National Science Foundation (NSF), Infrastructure for the European Network of Earth System Modelling (IS-ENES) and international laboratories such as the Max Planck Institute for Meteorology (MPI-M) german Climate Computing Centre (DKRZ), the Australian National University (ANU) National Computational Infrastructure (NCI), Institut Pierre-Simon Laplace (IPSL), and the British Atmospheric Data Center (BADC). Its main mission is to support current CMIP5 activities and prepare for future assesments. The ESGF architecture is based on a system of autonomous and distributed nodes, which interoperate through common acceptance of federation protocols and trust agreements. Data is stored at multiple nodes around the world, and served through local data and metadata services. Nodes exchange information about their data holdings and services, trust each other for registering users and establishing access control decisions. The net result is that a user can use a web browser, connect to any node, and seamlessly find and access data throughout the federation. This type of collaborative working organization and distributed architecture context en-lighted the need of integration and testing processes definition to ensure the quality of software releases and interoperability. This presentation will introduce the ESGF project and demonstrate the range of tools and processes that have been set up to support release management activities.

  2. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    Science.gov (United States)

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  3. 78 FR 63276 - Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

    Science.gov (United States)

    2013-10-23

    ... the orientation and tilt of the solar energy panels, reflectance, environment, and ocular factors are... energy systems on the airport must attach the SGHAT report, outlining solar panel glare and ocular impact... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Interim Policy, FAA Review of Solar...

  4. The U.S. Federal Highway Administration winter Maintenance Decision Support System (MDSS) project

    Energy Technology Data Exchange (ETDEWEB)

    Pisano, P.A. [Federal Highway Administration, Road Weather Managment Program, Washington, D.C. (United States); Stern, A.D. [Mitretek Systems, Inc., Oceanic, Atmospheric and Space Systems, Falls Church, VA (United States); Mahoney, W.P. [National Center for Atmospheric Research, Research Applications Program, Boulder, CO (United States)

    2004-07-01

    Managing a winter maintenance program today is an increasingly complex endeavor. Just making sure that a plow blade is at the ready when the first flake falls is only a small part of the task. With tight budgets and the high expectation of the public for keeping roads clear of snow and ice, today's maintenance manager has to be able to handle multiple tasks or risk getting behind the onslaught of winter weather. Good information leads to effective practices, however all of the regulations concerning chemical applications, environmental impacts and multiple, often contradictory weather forecasts can lead to information overload. The United States Department of Transportation (DOT), Federal Highway Administration (FHWA) recognized this potential problem in the late 1990's as part of its Road Weather Management (RWM) program. Generally speaking, there were plenty of weather forecasts, along with a few companies that issued road-specific forecasts, but there was a lack of linkage between the information available and the decisions made by winter maintenance managers. It was this weak link that became the genesis for the winter Maintenance Decision Support System (MDSS). The MDSS has since matured into a functional prototype. During the winter of 2002-2003, the prototype was deployed at several maintenance garages in central Iowa for a field demonstration. This paper will document the implementation of the demonstration, a summary of lessons learned, and technology transfer activities. It will also describe plans for a longer, more comprehensive demonstration during the winter of 2003-2004. (orig.)

  5. 2016 Earth System Grid Federation Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Dean N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-05-10

    The Earth System Grid Federation (ESGF) experienced a major setback in June 2015, when it experienced a security incident that brought all systems to a halt for more than half a year. However, federation developers and management committee members turned the incident into an opportunity to dramatically upgrade the system security and functionality and to develop planning and policy documents to guide ESGF evolution and success. Moreover, despite the incident, ESGF developer working teams continue to make strong and significant progress on various enhancement projects that will help ensure ESGF can meet the needs of the climate community in the coming years.

  6. State and Federal project development procedures for bus rapid transit : managing differences and reducing implementation delays

    Science.gov (United States)

    2011-08-01

    This report documents an investigation into the transportation project development process in the : context of the implementation of bus rapid transit systems on the State Highway System as well as such : systems being part of the Federal New Starts ...

  7. A User's Guide to the Federal Theater Project.

    Science.gov (United States)

    Sheridan, Frank; Leslie, Linda

    1997-01-01

    Presents a lesson plan constructed around materials found in the User's Guide to the Federal Project. The Federal Theater Project produced radical and populist plays during the Great Depression before being de-funded by a conservative Congress. The lessons include activities and discussion built around the original plays. (MJP)

  8. Federated query services provided by the Seamless SAR Archive project

    Science.gov (United States)

    Baker, S.; Bryson, G.; Buechler, B.; Meertens, C. M.; Crosby, C. J.; Fielding, E. J.; Nicoll, J.; Youn, C.; Baru, C.

    2013-12-01

    The NASA Advancing Collaborative Connections for Earth System Science (ACCESS) seamless synthetic aperture radar (SAR) archive (SSARA) project is a 2-year collaboration between UNAVCO, the Alaska Satellite Facility (ASF), the Jet Propulsion Laboratory (JPL), and OpenTopography at the San Diego Supercomputer Center (SDSC) to design and implement a seamless distributed access system for SAR data and derived data products (i.e. interferograms). A major milestone for the first year of the SSARA project was a unified application programming interface (API) for SAR data search and results at ASF and UNAVCO (WInSAR and EarthScope data archives) through the use of simple web services. A federated query service was developed using the unified APIs, providing users a single search interface for both archives (http://www.unavco.org/ws/brokered/ssara/sar/search). A command line client that utilizes this new service is provided as an open source utility for the community on GitHub (https://github.com/bakerunavco/SSARA). Further API development and enhancements added more InSAR specific keywords and quality control parameters (Doppler centroid, faraday rotation, InSAR stack size, and perpendicular baselines). To facilitate InSAR processing, the federated query service incorporated URLs for DEM (from OpenTopography) and tropospheric corrections (from the JPL OSCAR service) in addition to the URLs for SAR data. This federated query service will provide relevant QC metadata for selecting pairs of SAR data for InSAR processing and all the URLs necessary for interferogram generation. Interest from the international community has prompted an effort to incorporate other SAR data archives (the ESA Virtual Archive 4 and the DLR TerraSAR-X_SSC Geohazard Supersites and Natural Laboratories collections) into the federated query service which provide data for researchers outside the US and North America.

  9. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  10. Federal Procurement Data System - FAADS API

    Data.gov (United States)

    General Services Administration — The Federal Award Assistance Data System (FAADS) has been re-engineered as a real-time federal enterprise information system. Web services based on SOAP and XML,...

  11. Federal Procurement Data System - FPDS API

    Data.gov (United States)

    General Services Administration — The Federal Procurement Data System (FPDS) Next Generation has been re-engineered as a real-time federal enterprise information system. Web services based on SOAP...

  12. Federal Workplace Literacy Project. Internal Evaluation Report.

    Science.gov (United States)

    Matuszak, David J.

    This report describes the following components of the Nestle Workplace Literacy Project: six job task analyses, curricula for six workplace basic skills training programs, delivery of courses using these curricula, and evaluation of the process. These six job categories were targeted for training: forklift loader/checker, BB's processing systems…

  13. Waste hydrogen utilization project receives $12 M in federal support

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2005-10-01

    This article announced that $12.2 million dollars in federal funding support, over a 3 year period, will be made available to Sacre-Davey Innovations to support the development and demonstration of the Integrated Waste Hydrogen Utilization Project (IWHUP). The IWHUP is a clean energy project that will develop and demonstrate the feasibility of using hydrogen generated as a byproduct of a sodium chlorate manufacturing plant in North Vancouver. Greenhouse gas emissions and fossil fuels will be reduced by using purified hydrogen to fuel vehicles. The full hydrogen value chain will also be demonstrated by the IWHUP. This includes the supply, storage, distribution and use of hydrogen. Eight light-duty trucks running on hydrogen will be included in the demonstration, along with 4 public transit buses converted to run on a combination of compressed natural gas and hydrogen, and a fuel cell system operating on hydrogen while providing electrical power to a car wash. The newsletter article discussed the funding leveraged from various sources as well as the names of project participants. The article also mentioned that the IWHUP fuel station in North Vancouver will play a key role in sustainable transportation demonstrations during the 2010 Olympic and Paralympic Winter Games in Vancouver.

  14. FEDERAL PENSIONS: Judicial Survivors Annuities System Costs

    National Research Council Canada - National Science Library

    2002-01-01

    ...) specifying that we review certain aspects of the Judicial Survivors' Annuities System (JSAS), which is one of several survivor benefit plans applicable to particular groups of federal employees...

  15. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  16. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  17. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  18. U.S. Federal Reserve Systems

    Data.gov (United States)

    Department of Homeland Security — This dataset is comprised of forty-five entities that are part of the United States Federal Reserve System according to the United States Department of Treasury. The...

  19. Health System Measurement Project

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Health System Measurement Project tracks government data on critical U.S. health system indicators. The website presents national trend data as well as detailed...

  20. The OLAP-XML Federation System

    DEFF Research Database (Denmark)

    Yin, Xuepeng; Pedersen, Torben Bach

    2006-01-01

    We present the logical “OLAP-XML Federation System” that enables the external data available in XML format to be used as virtual dimensions. Unlike the complex and time-consuming physical integration of OLAP and external data in current OLAP systems, our system makes OLAP queries referencing fast...

  1. Federal Tax Incentives for Energy Storage Systems

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Katherine H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Elgqvist, Emma M [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Settle, Donald E [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-16

    Investments in renewable energy are more attractive due to the contribution of two key federal tax incentives. The investment tax credit (ITC) and the Modified Accelerated Cost Recovery System (MACRS) depreciation deduction may apply to energy storage systems such as batteries depending on who owns the battery and how the battery is used. The guidelines in this fact sheet apply to energy storage systems installed at the same time as the renewable energy system.

  2. How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

    Science.gov (United States)

    2013-04-01

    The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project : delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation : projects. Although design-build provide...

  3. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  4. 5th Annual Earth System Grid Federation

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Dean N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-04-01

    The purpose of the Fifth Annual Earth System Grid Federation (ESGF) Face-to-Face (F2F) Conference was to present the most recent information on the state of ESGF’s software stack and to identify and address the data needs and gaps for the climate and weather communities that ESGF supports.

  5. The Hybrid Management Model: Influences of Organizational Structure and IT Project Management Practices on the Performance of Federal IT Projects

    Science.gov (United States)

    Neves, Celine A.

    2012-01-01

    The federal government spends much money on information technology (IT) projects each year, yet numerous IT projects continue to underperform. For instance, in Fiscal Year 2008, OMB and federal agencies identified approximately 413 IT projects ($25.2 billion) as being poorly planned, poorly performing, or both. Agencies struggle to implement sound…

  6. Principal results of 'DEWAM' project implementation, Russian Federation

    International Nuclear Information System (INIS)

    Nechaev, A.F.

    2002-01-01

    This overview summarizes the key results of the four-year project 'Decontamination and Waste Management in the Course of Research Reactors Decommissioning' carried out within the framework of the IAEA's CRP 'Decommissioning Techniques for Research Reactors'. The project included two principal components: (1) info-analytical studies and development of a database system, and (2) research and development in the areas of decontamination and waste management technologies applicable to decommissioning. Details of the work are expounded in 29 publications and annual Progress Reports; the results of the study are used in corresponding university courses; and innovative technologies for radwaste processing and environmental restoration are planned to be introduced into practice. (author)

  7. Evaluation of the Impact of EISA Federal Project Investments

    Energy Technology Data Exchange (ETDEWEB)

    Judd, Kathleen S.; Wendel, Emily M.; Morris, Scott L.; Williamson, Jennifer L.; Halverson, Mark A.; Livingston, Olga V.; Loper, Susan A.

    2012-12-31

    The DOE's Federal Energy Management Program has been charged by Office of Management and Budget to conduct an evaluation on actual and verifiable energy savings and carbon emissions reductions from federal energy management investments made across the Federal government as a result of the Energy Independence and Security Act of 2007. This study presents the findings from that evaluation.

  8. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  9. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  10. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  11. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  12. 49 CFR 30.13 - Restrictions on Federal public works projects: Certification.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects... WORKS CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.13 Restrictions on Federal public works projects: Certification. As prescribed...

  13. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  14. Alternative Transportation System Demand Estimation for Federal Land Management Agencies.

    Science.gov (United States)

    2011-09-30

    Estimating travel demand for alternative transportation systems (ATS) is challenging in any context, but is even more daunting for Federal Land Management Agencies (FLMAs). Federal public land sites vary widely in their characteristics. Moreover, tra...

  15. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  16. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  17. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  18. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  19. 75 FR 65615 - Conditional Commitment for a Federal Loan Guarantee for Project Financing for Southwest Intertie...

    Science.gov (United States)

    2010-10-26

    ... DEPARTMENT OF ENERGY Conditional Commitment for a Federal Loan Guarantee for Project Financing for... based on the analysis in the Final Environmental Impact Statement for Project Financing for Southwest... support of debt financing for transmission infrastructure investment projects located in the United States...

  20. Developing Federated Services within Seismology: IRIS' involvement in the CoopEUS Project

    Science.gov (United States)

    Ahern, T. K.; Trabant, C. M.; Stults, M.

    2014-12-01

    As a founding member of the CoopEUS initiative, IRIS Data Services has partnered with five data centers in Europe and the UC Berkeley (NCEDC) in the US to implement internationally standardized web services to access seismological data using identical methodologies. The International Federation of Digital Seismograph Networks (FDSN) holds commission status within IASPEI/IUGG and as such is the international body that governs data exchange formats and access protocols within seismology. The CoopEUS project involves IRIS and UNAVCO as part of the EarthScope project and the European collaborators are all members of the European Plate Observing System (EPOS). CoopEUS includes one work package that attempts to coordinate data access between EarthScope and EPOS facilities. IRIS has worked with its partners in the FDSN to develop and adopt three key international service standards within seismology. These include 1) fdsn-dataselect, a service that returns time series data in a variety of standard formats, 2) fdsn-station, a service that returns related metadata about a seismic station in stationXML format, and 3) fdsn-event, a service that returns information about earthquakes and other seismic events in QuakeML format. Currently the 5 European data centers supporting these services include the ORFEUS Data Centre in the Netherlands, the GFZ German Research Centre for Geosciences in Potsdam, Germany, ETH Zurich in Switzerland, INGV in Rome, Italy, and the RESIF Data Centre in Grenoble France. Presently these seven centres can all be accessed using standardized web services with identical service calls and returns results in standardized ways. IRIS is developing an IRIS federator that will allow a client to seamlessly access information across the federated centers. Details and current status of the IRIS Federator will be presented.

  1. Federal-aid highways : FHWA has improved its risk management approach, but needs to improve its oversight of project costs.

    Science.gov (United States)

    2009-07-01

    The federal-aid highway program : provides about $33 billion a year to : states for highway projects. The : federal government provides : funding for and oversees this : program, while states largely : choose and manage the projects. : As requested, ...

  2. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Science.gov (United States)

    2010-06-24

    .... ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other Federal agencies... result of a tiered environmental review process under the National Environmental Policy Act, 42 U.S.C... judicial review of the Tier 1 Federal agency actions of the proposed highway and transit project will be...

  3. Wood Pellet-Fired Biomass Boiler Project at the Ketchikan Federal Building

    Energy Technology Data Exchange (ETDEWEB)

    Tomberlin, Gregg [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-06-01

    Biomass boiler systems have existed for many years, but the technology has advanced in recent decades and can now provide automated and efficient operation for a relatively modest investment. Key advances in system monitoring and control allow for lower operating costs, since the control systems run all aspects of the boiler, including feed, load reduction and even tube cleaning. These advances have made such systems economical on a small scale in situations where inexpensive fuels like natural gas are not available. This creates an opportunity for building operators in remote, cold-climate locations to reduce the use of expensive fuels for heating buildings. GSA Region 10 installed the system at the federal building in Ketchikan, Alaska and submitted the project to the Green Proving Ground (GPG) program. GSA's GPG program contracted with the National Renewable Energy Laboratory (NREL) to assess the installation and the technology. The system serves as a demonstration to assess actual system efficiencies, as well as operating characteristics and financial benefits. In addition to installation and operational issues, the project team/researchers examined other issues, including fuel transportation costs, building energy savings, and overall economics.

  4. Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources Projects

    Science.gov (United States)

    2006-09-01

    ERDC/TN ANSRP-06-3 September 2006 Freshwater Aquatic Nuisance Species Impacts and Management Costs and Benefits at Federal Water Resources...Cole, R. A. (2006). “ Freshwater aquatic nuisance species impacts and management costs and benefits at Federal Water resources projects,” ANSRP...Projects1 by Richard A. Cole THE ISSUE: A small fraction of the species that inhabit the nation’s fresh waters become aquatic nuisance species (ANS

  5. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    Science.gov (United States)

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  6. 75 FR 19168 - Federal Acquisition Regulation; FAR Case 2009-005, Use of Project Labor Agreements for Federal...

    Science.gov (United States)

    2010-04-13

    ..., manufacturing facilities, airports, power plants, transit systems, stadiums, and a prison. Project labor..., including for manufacturing plants, power plants, parking structures, and stadiums. For example, project... agencies to analyze whether a project labor agreement may be beneficial. The factors set forth in the rule...

  7. Federated product data management in multi company projects

    NARCIS (Netherlands)

    Pels, H.J.; Elmaraghy, H.A.; Elmaraghy, W.H.

    2005-01-01

    An approach for enabling concurrent engineering between companies by providing a proper collaboration platform, as developed in the VIDOP project is proposed. Apart from security, information status is an important element of trust. However, status-coding schemes differ much between companies and

  8. 33 CFR 337.10 - Supervision of Federal projects.

    Science.gov (United States)

    2010-07-01

    ... plans and description of the project as expressed in the SOF or ROD. Conditions and/or limitations... aware of their responsibilities for compliance with the terms and conditions of state certifications and other conditions expressed in the SOF or ROD. ...

  9. Health research 2000. Programme of the Federal German Government. Overview of projects '94

    International Nuclear Information System (INIS)

    Binkelmann, P.

    1995-01-01

    The health research programme of the Federal German Government has existed since 1978. Its implementation has been reported on at regular intervals by project status reports. The last report appeared in 1991. This research promotion pursues the following aims: to enhance preventive health care, to elucidate the causes of diseases and find effective treatments, to develop further an efficient, financially acceptable health care system. The book has three main parts, in accordance with the three main research areas: Intersectorial reseach, health care and preventive health care, fighting of diseases. Within these three sectors, the main research activities carried out in 1994 are described. Each research activity is introduced with a brief text on its aims and state of progress; this is followed by a description of the projects carried out. The projects that were on-going in 1994 are outlined in concise form; finalized projects within each main research activity are shown in tabulated form with their most important characteristics. The annex contains some bibliographic items and addresses. (orig./VHE) [de

  10. Flate-plate photovoltaic power systems handbook for Federal agencies

    Science.gov (United States)

    Cochrane, E. H.; Lawson, A. C.; Savage, C. H.

    1984-01-01

    The primary purpose is to provide a tool for personnel in Federal agencies to evaluate the viability of potential photovoltaic applications. A second objective is to provide descriptions of various photovoltaic systems installed by different Federal agencies under the Federal Photovoltaic Utilization Program so that other agencies may consider similar applications. A third objective is to share lessons learned to enable more effective procurement, design, installation, and operation of future photovoltaic systems. The intent is not to provide a complete handbook, but rather to provide a guide for Federal agency personnel with additional information incorporated by references. The steps to be followed in selecting, procuring, and installing a photovoltaic application are given.

  11. Writing Democracy: Notes on a Federal Writers' Project for the 21st Century

    Science.gov (United States)

    Carter, Shannon; Mutnick, Deborah

    2012-01-01

    A general overview of the Writing Democracy project, including its origin story and key objectives. Draws parallels between the historical context that gave rise to the New Deal's Federal Writers' Project and today, examining the potential for a reprise of FWP in community literacy and public rhetoric and introducing articles collected in this…

  12. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Science.gov (United States)

    2013-01-31

    ..., Cambridge, MA 02142, Monday through Friday 8:00 a.m.-4:30 p.m., 617-494-2419, [email protected]dot.gov . For the Massachusetts Department of Transportation Highway Division (MassDOT): Ms. Mary Hynes, Project Manager... on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT...

  13. 78 FR 18252 - Prevailing Rate Systems; North American Industry Classification System Based Federal Wage System...

    Science.gov (United States)

    2013-03-26

    ...-AM78 Prevailing Rate Systems; North American Industry Classification System Based Federal Wage System... applicable sections. The Federal Prevailing Rate Advisory Committee, the national labor- management committee... proposing to amend 5 CFR part 532 as follows: PART 532--PREVAILING RATE SYSTEMS 0 1. The authority citation...

  14. Automated Patient Information Systems for Federal Government ...

    African Journals Online (AJOL)

    2012-12-01

    Dec 1, 2012 ... *Department of Computer Science, Nnamdi Azikiwe University, PMB5025 Awka, Anambra State, Nigeria boni_eke@yahoo.com. ** Dept of Information Technology, National Open University, Awka .... When funding for project.

  15. Renewable Energy Project Financing: Impacts of the Financial Crisis and Federal Legislation

    Energy Technology Data Exchange (ETDEWEB)

    Schwabe, P.; Cory, K.; Newcomb, J.

    2009-07-01

    Extraordinary financial market conditions have disrupted the flows of equity and debt investment into U.S. renewable energy (RE) projects since the fourth quarter of 2008. The pace and structure of renewable energy project finance has been reshaped by a combination of forces, including the financial crisis, global economic recession, and major changes in federal legislation affecting renewable energy finance. This report explores the impacts of these key market events on renewable energy project financing and development.

  16. Mexico - The Federal Procurement System : Challenges and Opportunities

    OpenAIRE

    World Bank

    2007-01-01

    The World Bank carried out the first country procurement assessment review (CPAR) jointly with the Government in 2001, focusing on the features and performance of the federal procurement system. Based on the action plan included in the 2001 CPAR, the government reformed federal procurement laws and regulations in 2005 and furthered the development of Government Procurement Electronic Syste...

  17. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  18. 78 FR 58153 - Prevailing Rate Systems; North American Industry Classification System Based Federal Wage System...

    Science.gov (United States)

    2013-09-23

    ... American Industry Classification System Based Federal Wage System Wage Surveys AGENCY: U.S. Office of... in Federal Wage System wage survey industry regulations with the 2012 NAICS revisions published by.... Applicability date: This rule applies for local wage surveys beginning on or after February 21, 2014. FOR...

  19. Federal Interagency Traumatic Brain Injury Research (FITBIR) Informatics System

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Federal Interagency Traumatic Brain Injury Research (FITBIR) informatics system is an extensible, scalable informatics platform for TBI relevant imaging,...

  20. Cask system maintenance in the Federal Waste Management System

    International Nuclear Information System (INIS)

    Pope, R.B.; Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, ''green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, ''green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs

  1. MODERN TAXATION SYSTEM FORMATION IN RUSSIAN FEDERATION

    Directory of Open Access Journals (Sweden)

    Viktoria Aleksandrovna Tsokova

    2013-11-01

    Full Text Available The Russian taxation system was formed in the beginning of 90-s and experienced the evolution and sometimes revolution transformations. The state taxation system was created on the basis of the foreign countries’ experience nowever the research testifies the trends of the progressive development of the Russian taxation system elements including the national peculiarities.DOI: http://dx.doi.org/10.12731/2218-7405-2013-7-63

  2. Joint nuclear safety research projects between the US and Russian Federation International Nuclear Safety Centers

    International Nuclear Information System (INIS)

    Bougaenko, S.E.; Kraev, A.E.; Hill, D.L.; Braun, J.C.; Klickman, A.E.

    1998-01-01

    The Russian Federation Ministry for Atomic Energy (MINATOM) and the US Department of Energy (USDOE) formed international Nuclear Safety Centers in October 1995 and July 1996, respectively, to collaborate on nuclear safety research. Since January 1997, the two centers have initiated the following nine joint research projects: (1) INSC web servers and databases; (2) Material properties measurement and assessment; (3) Coupled codes: Neutronic, thermal-hydraulic, mechanical and other; (4) Severe accident management for Soviet-designed reactors; (5) Transient management and advanced control; (6) Survey of relevant nuclear safety research facilities in the Russian Federation; (8) Advanced structural analysis; and (9) Development of a nuclear safety research and development plan for MINATOM. The joint projects were selected on the basis of recommendations from two groups of experts convened by NEA and from evaluations of safety impact, cost, and deployment potential. The paper summarizes the projects, including the long-term goals, the implementing strategy and some recent accomplishments for each project

  3. Federalism, Agenda Setting, and the Dynamics of Federal Education Policy.

    Science.gov (United States)

    Manna, Paul

    This paper is part of a larger project on agenda setting in the U.S. federal system and the development of the federal education agenda since 1965. Two questions motivate the paper, one theoretical and the other empirical: (1) how does federalism affect the federal agenda?; and (2) what explains the development of federal involvement in K-12…

  4. Beyond Rehabilitation: The Federal City College Lorton Project--A Model Prison Higher Education Program

    Science.gov (United States)

    Taylor, Andress

    1974-01-01

    A description and evaluation of the Federal City College (the first Urban Land Grant institution in the nation) higher education program offered in association with a group of Washington, D.C., penal institutions located in Lorton, Virginia. This Lorton Project has been adopted as a National Model by the Department of Health, Education, and…

  5. Reshaping the Federal System for a Postmodern Workforce

    Directory of Open Access Journals (Sweden)

    Daryl D. Green

    2016-12-01

    Full Text Available The federal government faces a human capital crisis over the next several years due to driving environmental forces, which include the reduction in the replacement labor force cohorts and the image problem of public service. One of the great challenges facing the federal service is the need to address the negative perceptions of the quality of work life experienced in the federal service, especially for younger employees. Consequently, governmental organizations must cope with increasing aging of their labor forces and elevated retirement levels exacerbating succession planning and knowledge transfer practices. This paper examines the current environment of the federal system and explores how it must adapt to postmodern influences that are embraced by Millennial and Generation X employees. While today’s federal system is rigid in many of its key leadership, performance management, and support service delivery systems, the postmodern workforce thrives on flexibility, involvement, and excitement. This paper further examines what leadership concepts and competencies can assist in the positive transformation of the federal government.

  6. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  7. Adaptive Federal Kalman Filtering for SINS/GPS Integrated System

    Institute of Scientific and Technical Information of China (English)

    杨勇; 缪玲娟

    2003-01-01

    A new adaptive federal Kalman filter for a strapdown integrated navigation system/global positioning system (SINS/GPS) is given. The developed federal Kalman filter is based on the trace operation of parameters estimation's error covariance matrix and the spectral radius of update measurement noise variance-covariance matrix for the proper choice of the filter weight and hence the filter gain factors. Theoretical analysis and results from simulation in which the SINS/GPS was compared to conventional Kalman filter are presented. Results show that the algorithm of this adaptive federal Kalman filter is simpler than that of the conventional one. Furthermore, it outperforms the conventional Kalman filter when the system is undertaken measurement malfunctions because of its possession of adaptive ability. This filter can be used in the vehicle integrated navigation system.

  8. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  9. Federating resources of information systems: browsing interface (FRISBI)

    NARCIS (Netherlands)

    Malchanau, A.V.; van der Vet, P.E.; Roosendaal, Hans E.; de Bra, P.M.E.

    2003-01-01

    Designing the user interface of a federated system (what we call a browsing interface) must consider the knowledge gap that exists between desires of the users and the needs the systems are built to support. The concept of Habitable Interfaces aims to bridge the knowledge gap by providing kinds of

  10. 23 CFR 470.107 - Federal-aid highway systems.

    Science.gov (United States)

    2010-04-01

    ... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH HIGHWAY SYSTEMS... industrial centers, including important routes into, through, and around urban areas, serve the national... importance in Canada and Mexico. (2) The portion of the Interstate System designated under 23 U.S.C. 103 (e...

  11. National monetary policy by regional design: the evolving role of the Federal Reserve banks in Federal Reserve System policy

    OpenAIRE

    David C. Wheelock

    1999-01-01

    This paper examines the history of Federal Reserve Bank input into Federal Reserve System monetary policymaking. From the Fed's founding in 1914 through the Great Depression, the Reserve Banks held the balance of power. Dissatisfaction with the Fed's performance, however, led to a wholesale reorganization in 1935 that greatly enhanced the authority of the Federal Reserve Board, but retained a role for the Federal Banks through the membership of their presidents on the FOMC, as well as in sett...

  12. ADVANCED TURBINE SYSTEM FEDERAL ASSISTANCE PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    Frank Macri

    2003-10-01

    Rolls-Royce Corporation has completed a cooperative agreement under Department of Energy (DOE) contract DE-FC21-96MC33066 in support of the Advanced Turbine Systems (ATS) program to stimulate industrial power generation markets. This DOE contract was performed during the period of October 1995 to December 2002. This final technical report, which is a program deliverable, describes all associated results obtained during Phases 3A and 3B of the contract. Rolls-Royce Corporation (formerly Allison Engine Company) initially focused on the design and development of a 10-megawatt (MW) high-efficiency industrial gas turbine engine/package concept (termed the 701-K) to meet the specific goals of the ATS program, which included single digit NOx emissions, increased plant efficiency, fuel flexibility, and reduced cost of power (i.e., $/kW). While a detailed design effort and associated component development were successfully accomplished for the 701-K engine, capable of achieving the stated ATS program goals, in 1999 Rolls-Royce changed its focus to developing advanced component technologies for product insertion that would modernize the current fleet of 501-K and 601-K industrial gas turbines. This effort would also help to establish commercial venues for suppliers and designers and assist in involving future advanced technologies in the field of gas turbine engine development. This strategy change was partly driven by the market requirements that suggested a low demand for a 10-MW aeroderivative industrial gas turbine, a change in corporate strategy for aeroderivative gas turbine engine development initiatives, and a consensus that a better return on investment (ROI) could be achieved under the ATS contract by focusing on product improvements and technology insertion for the existing Rolls-Royce small engine industrial gas turbine fleet.

  13. Expert system application education project

    Science.gov (United States)

    Gonzelez, Avelino J.; Ragusa, James M.

    1988-01-01

    Artificial intelligence (AI) technology, and in particular expert systems, has shown potential applicability in many areas of operation at the Kennedy Space Center (KSC). In an era of limited resources, the early identification of good expert system applications, and their segregation from inappropriate ones can result in a more efficient use of available NASA resources. On the other hand, the education of students in a highly technical area such as AI requires an extensive hands-on effort. The nature of expert systems is such that proper sample applications for the educational process are difficult to find. A pilot project between NASA-KSC and the University of Central Florida which was designed to simultaneously address the needs of both institutions at a minimum cost. This project, referred to as Expert Systems Prototype Training Project (ESPTP), provided NASA with relatively inexpensive development of initial prototype versions of certain applications. University students likewise benefit by having expertise on a non-trivial problem accessible to them at no cost. Such expertise is indispensible in a hands-on training approach to developing expert systems.

  14. Radioactive Waste Management System: Draft Project Decision Schedule. Revision

    International Nuclear Information System (INIS)

    1985-07-01

    The Nuclear Waste Policy Act (NWPA) of 1982 (Pub. L. 97-425) requires that the Secretary of Energy prepare, in cooperation with affected Federal agencies, a Project Decision Schedule that portrays the optimum way to attain the operation of geologic repositories. The Draft Project Decision Schedule portrays the major milestones of the Radioactive Waste Management System. It also depicts the set of activities for which Federal agencies have responsibility and the deadlines for taking the required action that are associated with the activities. The NWPA also requires that Federal agencies having determined that they: (1) cannot comply with a deadline for taking a required action; or (2) fail to comply with a deadline contained in the Project Decision Schedule; submit a comprehensive report to the Secretary of Energy and Congress to explain their failure or expected failure. The Secretary, in turn, is required to submit to Congress a response to the agency's report. 7 figs., 13 tabs

  15. Research notes : solar powered navigational lighting system demonstration project.

    Science.gov (United States)

    2011-04-01

    ODOT will be installing a solar powered navigational lighting system on the AstoriaMegler Bridge as part of a pilot project approved by the Federal Highways Administration (FHWA). The coastal bridge is the connection across the Columbia River on U.S....

  16. 75 FR 70013 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Science.gov (United States)

    2010-11-16

    ... 0938-AP89 Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal... the July 22, 2010 Federal Register entitled, ``Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2011.'' DATES: Effective Date. This correction is effective for IRF...

  17. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  18. 76 FR 33362 - Request for Interest in Lease Arrangement on Federal Lands, San Luis Project, Los Banos, California

    Science.gov (United States)

    2011-06-08

    ... facilitating environmentally appropriate renewable-energy projects involving solar, wind and waves, geothermal... Federal Lands, San Luis Project, Los Banos, California AGENCY: Bureau of Reclamation, Interior. ACTION... energy project(s) in a lease arrangement on existing Reclamation lands in the vicinity of the San Luis...

  19. U.S. Coastal Flood Damage Reduction Projects: Federal Authorization and Investment Trends

    Science.gov (United States)

    Carter, N. T.

    2015-12-01

    The 2015 U.S. Environmental Protection Agency report Climate Change in the United States: Benefits of Global Action estimated the potential cumulative future economic impacts of storm surge and sea-level rise on U.S. coasts during this century at 5 trillion (2014 dollars) if no adaptation measures are implemented. These impacts drop to 0.8 trillion if investments are made in cost-effective adaptations and protections. Awareness of flood risk and its long-term fiscal impact historically has proven insufficient to motivate pre-disaster land use changes and investments in mitigation and protection. While many adaptations and protections fall largely under state and local authority, some stakeholders are interested in federal coastal flood protection projects, including projects by the U.S. Army Corps of Engineers. Since the 1950s, Congress has authorized the Corps to construct specific coastal projects. The broad vision, strategy, and priorities for the federal role in coastal flood damage reduction projects nonetheless remain ill-defined. This research analyzes (1) the authorization and appropriations trends for Corps coastal storm damage reduction projects, and (2) how Corps feasibility studies account for and address coastal flood hazards. Identified trends include: emergency appropriations for storm-damaged areas outstrip annual investments in coastal flood projects; the rate at which projects are congressionally approved for construction outpaces the rate at which construction is funded; and how coastal protection projects are evaluated in Corps feasibility studies shows variation and change in agency practices. These trends have consequences; they affect public and local expectations when projects begin providing protection benefits, and may influence investments in other adaptation measures. These trends also raise questions for policymakers at all levels and for scientists and practitioners interested in coastal flood resilience.

  20. RIVER INTER-LINKING (RIL) PROJECT: A QUESTION ON INDIAN FEDERALISM.

    OpenAIRE

    Shazia Waheed; Pradip Kumar Jha.

    2017-01-01

    The Supreme Court of India, in 2002 directed the central government to link major Indian rivers within 10 years. In December 2002, the government appointed a task force on interlinking of 37 rivers and the dead line was extended by 2016. The RIL project not only raises national issue but also give way to international conflict in South Asia over sharing of river waters. The paper examines the impact of the RIL project on the paradigms and working of Indian federalism. It is based on triangula...

  1. Designing a federated multimedia information system on the semantic web

    NARCIS (Netherlands)

    Vdovják, R.; Barna, P.; Houben, G.J.P.M.; Eder, J.; Missikoff, M.

    2003-01-01

    A federated Web-based multimedia information system on one hand gathers its data from various Web sources, on the other hand offers the end-user a rich semantics describing its content and a user-friendly environment for expressing queries over its data. There are three essential ingredients to

  2. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  3. National Unmanned Aircraft Systems Project Office

    Science.gov (United States)

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  4. A Federated Recommender System for Online Learning Environments

    OpenAIRE

    Zhou, Lei; El Helou, Sandy; Moccozet, Laurent; Opprecht, Laurent; Benkacem, Omar; Salzmann, Christophe; Gillet, Denis

    2012-01-01

    From e-commerce to social networking sites, recommender systems are gaining more and more interest. They provide connections, news, resources, or products of interest. This paper presents a federated recommender system, which exploits data from different online learning platforms and delivers personalized recommendation. The underlying educational objective is to enable academic institutions to provide a Web 2.0 dashboard bringing together open resources from the Cloud and proprietary content...

  5. Real Property Project Tracking System (RPPTS)

    Data.gov (United States)

    Department of Veterans Affairs — The Real Property Project Tracking System (RPPTS), formerly known as the Lease/Project Tracking (LEASE) database, contains information about lease and land projects...

  6. MedHySol: Future federator project of massive production of solar hydrogen

    Energy Technology Data Exchange (ETDEWEB)

    Mahmah, Bouziane; Harouadi, Farid; Chader, Samira; Belhamel, Maiouf; M' Raoui, Abdelhamid; Abdeladim, Kamel [CDER, BP 62, Route de l' Observatoire, Bouzareah, Alger (Algeria); Benmoussa, H. [LESEI, Universite de Batna, Batna (Algeria); Cherigui, Adel Nasser [Universite Joseph Fourier Grenoble I, BP 87, Saint-Martin-D' Heres 38400 (France); Etievant, Claude [CETH, Innov' valley Entreprises, 91460 Marcoussis (France)

    2009-06-15

    Mediterranean Hydrogen Solar (MedHySol) is a federator project for development of a massive hydrogen production starting from solar energy and its exportation within a framework of a Euro-Maghrebian Cooperation project for industrial and energetic needs in the Mediterranean basin. The proposal of this project is included in the Algiers Declaration's on Hydrogen from Renewable Origin following the organization of the first international workshop on hydrogen which was held in 2005. Algeria is the privileged site to receive the MedHySol platform. The objective of the first step of the project is to realize a technological platform allowing the evaluation of emergent technologies of hydrogen production from solar energy with a significant size (10-100 kW) and to maintain the development of energetic rupture technologies. The second step of the project is to implement the most effective and less expensive technologies to pilot great projects (1-1000 MW). In this article we present the potentialities and the feasibility of MedHySol, as well as the fundamental elements for a scientific and technical supervision of this great project. (author)

  7. Site-specific cultivation systems for energy plants. Results of the joint project ''Development and comparison of optimized cultivation systems for the agricultural production of energy plants at different site-specific conditions in the Federal Republic of Germany, EVA I''. 3. rev. and enl. ed.; Standortangepasste Anbausysteme fuer Energiepflanzen. Ergebnisse des Verbundprojektes ''Entwicklung und Vergleich von optimierten Anbausystemen fuer die landwirtschaftliche Produktion von Energiepflanzen unter den verschiedenen Standortbedingungen Deutschlands, EVA I''

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    With respect to the estimations of the Agency for Renewable Ressources (Guelzow, Federal Republic of Germany), nearly 2 millions ha of the area of arable land in Germany were used for the production of renewable raw materials in the last years. The production of vegetable energy sources only was limited on few cultural species. This led to criticism by organisations of nature protection and environmental protection. The joint project 'Development and comparison of optimized cultivation system for the agricultural production of energy plants at different site specific conditions in the Federal Republic of Germany' was one of the most extensive national agrarian research projects of the past years. This joint project offers practice-relevant knowledge to efficient and sustainable cultivation systems of energy plants. The brochure under consideration reports on the results of the first project phase of this joint project.

  8. Exploration Medical System Demonstration Project

    Science.gov (United States)

    Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.

    2011-01-01

    A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide

  9. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section on establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.

  10. Institutional repository in communication: the REPOSCOM project implemented in the digital libraries federation of communication science

    Directory of Open Access Journals (Sweden)

    Sueli Mara Soares Pinto Ferreira

    2007-01-01

    Full Text Available Considering the conceptualization, characterization and context of the institutional repositories (IR this paper discuss the procedures, policies and strategies delineated to the implementation of IR in a research environment. The object of discussion is the project called Reposcom - Institutional Repository of Intercom (Brazilian Society of Interdisciplinary Studies of Communication – which is part of a broader project managed by the Portcom – Information Network in Communication Sciences of Countries of Portuguese Language – and called Digital Libraries Federation in the Communication Sciences. Aiming to share the knowledge and experience acquired with the implementation of the Reposcom, this paper describes its work activities, the decisions made, the customization of the software DSpace (the technological solution and the initial results achieved with the project.

  11. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  12. THE BANKING SYSTEM OF THE RUSSIAN FEDERATION: STATUS AND PROSPECTS

    Directory of Open Access Journals (Sweden)

    L. N. Sotnikova

    2015-01-01

    Full Text Available The features and current trends in the development of the banking system of the Russian Federation are highlighted in the article. The authors propose an original method of evaluation of activities of credit organizations with the use of statistical data and rating agencies. The concept of the banking system is summarized in this article. Also its structure is analyzed by the number of credit institutions and the quality of their operations. The authors identifie differences between the concepts of banking service, banking operation and banking product and propose classification according to different characteristics of banking institutions and operations that they carry out. Then the authors go to estimating the volume of banking services in Russia and their patterns in total. Separately the main passive (deposits and loans and active operations (lending to legal entities and individuals are characterized. The authors identifie the major developments in the banking system of the Russian Federation in 2014 due to political and economic sanctions by the U.S. and Eurozone countries. The article provides a vision of the authors on the further development of the banking activity in Russia and proposes specific measures to adapt the banking system of the Russian Federation in a constantly changing political and economic conditions (financial sanctions, a change of key Central Bank rates, devaluation, etc.. According to the authors' opinion the expected prospects of development of the banking system of the Russian Federation to 2015 are: the growth in savings accounts in banks; sanctions will be of a personal nature and will not affect the largest credit institutions; the active growth of the corporate loan portfolio will continue; the growth of retail lending portfolio will continue to slow; mortgage lending will increase in the total loan portfolio of the banking sector of Russia.

  13. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Bower, John C.(BATTELLE (PACIFIC NW LAB)); Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Holter, Nancy A.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Schulze, Stacy A.(BATTELLE (PACIFIC NW LAB)); Sivaraman, Chitra (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Stoops, Lamar R.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS System Administration Guide provides information on FEMIS System Administrator activities as well as the utilities that are included with FEMIS.

  14. THE CONCEPT OF TRANSFER PRICING SYSTEM IN RUSSIAN FEDERATION

    Directory of Open Access Journals (Sweden)

    Alexey S. Besfamilnyy

    2016-01-01

    Full Text Available The article presents the author's denition of transfer prices and transfer pricing based on the analysis of the current legislation in Russia as well as on current economic practice. Considered state regulation of transfer pricing for the purpose of harmonization of relationship between government and business. Given the denition of the transfer pricing system in Russian Federation and the description of its main parts and connections between them, necessary for effective functioning.

  15. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  16. Comparing replacement rates under private and federal retirement systems.

    Science.gov (United States)

    Martin, Patricia P

    One measure of the adequacy of retirement income is replacement rate - the percentage of pre-retirement salary that is available to a worker in retirement. This article compares salary replacement rates for private-sector employees of medium and large private establishments with those for federal employees under the Civil Service Retirement System and the Federal Employees Retirement System. Because there is no standard benefit formula to represent the variety of formulas available in the private sector, a composite defined benefit formula was developed using the characteristics of plans summarized in the Bureau of Labor Statistics Medium and Large Employer Plan Survey. The resulting "typical" private-sector defined benefit plan, with an accompanying defined contribution plan, was then compared with the two federal systems. The Civil Service Retirement System (CSRS) is a stand-alone defined benefit plan whose participants are not covered by Social Security. Until passage of the 1983 Amendments to Social Security Act, it was the only retirement plan for most federal civilian employees. Provisions of the 1983 Amendments were designed to restore long-term financial stability to the Social Security trust funds. One provision created the Federal Employees Retirement System (FERS), which covers federal employees hired after 1983. It was one of the provisions designed to restore long-term financial stability to the Social Security trust funds. FERS employees contribute to and are covered by Social Security. FERS, which is a defined benefit plan, also includes a basic benefit and a 401(k)-type plan known as the Thrift Savings Plan (TSP). To compare how retirees would fare under the three different retirement systems, benefits of employees retiring at age 65 with 35 years of service were calculated using hypothetical workers with steady earnings. Workers were classified according to a percentage of the average wage in the economy: low earners (45 percent), average earners

  17. 41 CFR 102-80.55 - Are Federal agencies responsible for managing the execution of risk reduction projects?

    Science.gov (United States)

    2010-07-01

    ... Management Risks and Risk Reduction Strategies § 102-80.55 Are Federal agencies responsible for managing the... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are Federal agencies responsible for managing the execution of risk reduction projects? 102-80.55 Section 102-80.55 Public...

  18. 75 FR 59237 - TRICARE Co-Pay Waiver at Captain James A. Lovell Federal Health Care Center Demonstration Project

    Science.gov (United States)

    2010-09-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Co-Pay Waiver at Captain James A. Lovell.... ACTION: Notice of TRICARE Co-Pay waiver at Captain James A. Lovell Federal Health Care Center... ``TRICARE Co-Pay Waiver at Captain James A. Lovell Federal Health Care (FHCC) Demonstration Project.'' Under...

  19. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  20. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  1. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  2. `95 computer system operation project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new.

  3. '95 computer system operation project

    International Nuclear Information System (INIS)

    Kim, Young Taek; Lee, Hae Cho; Park, Soo Jin; Kim, Hee Kyung; Lee, Ho Yeun; Lee, Sung Kyu; Choi, Mi Kyung

    1995-12-01

    This report describes overall project works related to the operation of mainframe computers, the management of nuclear computer codes and the project of nuclear computer code conversion. The results of the project are as follows ; 1. The operation and maintenance of the three mainframe computers and other utilities. 2. The management of the nuclear computer codes. 3. The finishing of the computer codes conversion project. 26 tabs., 5 figs., 17 refs. (Author) .new

  4. Structure and Functions of the Federal Reserve System

    National Research Council Canada - National Science Library

    Smale, Pauline

    2005-01-01

    .... The Federal Reserve formulates the nation's monetary policy, supervises and regulates banks, and provides a variety of financial services to depository financial institutions and the federal government...

  5. 48 CFR 9.104-6 - Federal Awardee Performance and Integrity Information System.

    Science.gov (United States)

    2010-10-01

    ... Performance and Integrity Information System. 9.104-6 Section 9.104-6 Federal Acquisition Regulations System... Contractors 9.104-6 Federal Awardee Performance and Integrity Information System. (a) Before awarding a... Federal Awardee Performance and Integrity Information System (FAPIIS), (available at www.ppirs.gov, then...

  6. Web-based Project Reporting System

    Data.gov (United States)

    US Agency for International Development — Web-PRS is a web-based system that captures financial information and project status information that is sortable by geographical location, pillar, project type and...

  7. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  8. The Federal Cylinder Project: A Guide to Field Cylinder Collections in Federal Agencies. Volume 1, Introduction and Inventory.

    Science.gov (United States)

    Brady, Erika; And Others

    Volume one of a multivolume catalog inventories 247 federal agency collections of wax cylinder recordings made by early ethnographers during 5 decades (1890-1941) of field work with Native American, traditional American, and world cultures. Native American music, chants, and linguistic samples comprise the majority of the collection. In addition…

  9. The Federated Satellite Systems paradigm: Concept and business case evaluation

    Science.gov (United States)

    Golkar, Alessandro; Lluch i Cruz, Ignasi

    2015-06-01

    This paper defines the paradigm of Federated Satellite Systems (FSS) as a novel distributed space systems architecture. FSS are networks of spacecraft trading previously inefficiently allocated and unused resources such as downlink bandwidth, storage, processing power, and instrument time. FSS holds the promise to enhance cost-effectiveness, performance and reliability of existing and future space missions, by networking different missions and effectively creating a pool of resources to exchange between participants in the federation. This paper introduces and describes the FSS paradigm, and develops an approach integrating mission analysis and economic assessments to evaluate the feasibility of the business case of FSS. The approach is demonstrated on a case study on opportunities enabled by FSS to enhance space exploration programs, with particular reference to the International Space Station. The application of the proposed methodology shows that the FSS concept is potentially able to create large commercial markets of in-space resources, by providing the technical platform to offer the opportunity for spacecraft to share or make use of unused resources within their orbital neighborhood. It is shown how the concept is beneficial to satellite operators, space agencies, and other stakeholders of the space industry to more flexibly interoperate space systems as a portfolio of assets, allowing unprecedented collaboration among heterogeneous types of missions.

  10. Reports on the projects in the field of reactor safety sponsored by the Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1977-11-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS-projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear energy plants and their systems and the further development of safety technology. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of BMFT, informs continuously of the status of these investigations within the series 'GRS-F-Fortschrittsberichte' (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the different projects of the search program. The individual reports are prepared by the contractors themselves as a documentation of their progress in work and published by the GRS-FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of the progress in reactor safety research. Each report describes the work performed, the results and the next steps of the work. The individual reports are attached to the classification system established by the CEC (Commission of the European Communities). The GRS-F-Progress Reports also include a list of the current investigations arranged according to the projects of the BMFT-Research Program Reactor Safety. This compilation, in addition to the LWR-investigations, also contains first contributions on the safety of advanced reactors. (orig.) [de

  11. Reports on the projects in the field of reactor safety sponsored by the Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1977-12-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS-projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear energy plants and their systems and the further development of safety technology. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of these investigations within the series 'GRS-F-Fortschrittsberichte' (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the different projects of the search program. The individual reports are prepared by the contractors themselves as a documentation of their progress in work and published by the GRS-FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of the progress in reactor safety research. Each report describes the work performed, the results and the next steps of the work. The individual reports are attached to the classification system established by the CEC (Commission of the European Communities). The GRS-F-Progress Reports also include a list of the current investigations arranged according to the projects of the BMFT-Research Program Reactor Safety. This compilation, in addition to the LWR-investigations, also contains first contributions on the safety of advanced reactors. (orig.) [de

  12. Reports on the projects in the field of reactor safety sponsored by the Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1977-06-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS-projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear energy plants and their systems and the further development of safety technology. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of these investigations within the series 'GRS-F-Forschrittsberichte' (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the different projects of the search program. The individual reports are prepared by the contractors themselves as a documentation of their progress in work and published by the GRS-FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of the progress in reactor safety research. Each report describes the work performed, the results and the next steps of the work. The individual reports are attached to the classification system established by the CEC (Commission of the European Communities). The GRS-F-Progress Reports also include a list of the current investigations arranged according to the projects of the BMFT-Research Program Reactor Safety. This compilation, in addition to the LWR-investigations, also contains first contributions on the safety of advanced reactors. (orig.) [de

  13. 77 FR 44673 - Meeting of the Department of Justice National Motor Vehicle Title Information System Federal...

    Science.gov (United States)

    2012-07-30

    ... Department of Justice National Motor Vehicle Title Information System Federal Advisory Committee AGENCY... a meeting of Department of Justice's (DOJ's) National Motor Vehicle Title Information System (NMVTIS...., Washington, DC 20531. FOR FURTHER INFORMATION CONTACT: Todd Brighton, Designated Federal Employee (DFE...

  14. 41 CFR 101-29.102 - Use of metric system of measurement in Federal product descriptions.

    Science.gov (United States)

    2010-07-01

    ... PROCUREMENT 29-FEDERAL PRODUCT DESCRIPTIONS 29.1-General § 101-29.102 Use of metric system of measurement in... measurement in Federal product descriptions. 101-29.102 Section 101-29.102 Public Contracts and Property... Federal agencies to: (a) Maintain close liaison with other Federal agencies, State and local governments...

  15. An updated hip fracture projection in Asia: The Asian Federation of Osteoporosis Societies study

    Directory of Open Access Journals (Sweden)

    Ching-Lung Cheung

    2018-03-01

    Full Text Available Objectives: Hip fracture is a major public health problem. Earlier studies projected that the total number of hip fracture will increase dramatically by 2050, and most of the hip fracture will occur in Asia. To date, only a few studies provided the updated projection, and none of them focused on the hip fracture projection in Asia. Thus, it is essential to provide the most up to date prediction of hip fracture in Asia, and to evaluate the total direct medical cost of hip fracture in Asia. Methods: We provide the updated projection of hip fracture in 9 Asian Federation of Osteoporosis Societies members using the most updated incidence rate and projected population size. Results: We show that the number of hip fracture will increase from 1,124,060 in 2018 to 2,563,488 in 2050, a 2.28-fold increase. This increase is mainly due to the changes on the population demographics, especially in China and India, which have the largest population size. The direct cost of hip fracture will increase from 9.5 billion United State dollar (USD in 2018 to 15 billion USD in 2050, resulting a 1.59-fold increase. A 2%–3% decrease in incidence rate of hip fracture annually is required to keep the total number of hip fracture constant over time. Conclusions: The results show that hip fracture remains a key public health issue in Asia, despite the available of better diagnosis, treatment, and prevention of fracture over the recent years. Healthcare policy in Asia should be aimed to reduce the burden of hip fracture. Keywords: Hip fracture, Asia, Osteoporosis, Incidence

  16. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  17. Development of an Audit Classification Index (ACI) for Federal E-Learning Systems Security Vulnerabilities

    Science.gov (United States)

    Johnson, Gerald D.

    2012-01-01

    As U.S federal government agencies have increased the use of the Internet to utilize technologies such as e-learning, U.S. federal government information systems have become more exposed to security vulnerabilities that may contribute to system attacks and system exploitation. U.S. federal government agencies are required to come up with their own…

  18. 78 FR 26879 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Science.gov (United States)

    2013-05-08

    ... Prospective Payment System for Federal Fiscal Year 2014; Proposed Rule #0;#0;Federal Register / Vol. 78, No... Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2014 AGENCY... IRF prospective payment system's (PPS) case-mix groups and a description of the methodology and data...

  19. Coordinate systems and map projections

    CERN Document Server

    Maling, DH

    1992-01-01

    A revised and expanded new edition of the definitive English work on map projections. The revisions take into account the huge advances in geometrical geodesy which have occurred since the early years of satellite geodesy. The detailed configuration of the geoid resulting from the GEOS and SEASAT altimetry measurements are now taken into consideration. Additionally, the chapter on computation of map projections is updated bearing in mind the availability of pocket calculators and microcomputers. Analytical derivation of some map projections including examples of pseudocylindrical and polyconic

  20. Federated data storage system prototype for LHC experiments and data intensive science

    Science.gov (United States)

    Kiryanov, A.; Klimentov, A.; Krasnopevtsev, D.; Ryabinkin, E.; Zarochentsev, A.

    2017-10-01

    Rapid increase of data volume from the experiments running at the Large Hadron Collider (LHC) prompted physics computing community to evaluate new data handling and processing solutions. Russian grid sites and universities’ clusters scattered over a large area aim at the task of uniting their resources for future productive work, at the same time giving an opportunity to support large physics collaborations. In our project we address the fundamental problem of designing a computing architecture to integrate distributed storage resources for LHC experiments and other data-intensive science applications and to provide access to data from heterogeneous computing facilities. Studies include development and implementation of federated data storage prototype for Worldwide LHC Computing Grid (WLCG) centres of different levels and University clusters within one National Cloud. The prototype is based on computing resources located in Moscow, Dubna, Saint Petersburg, Gatchina and Geneva. This project intends to implement a federated distributed storage for all kind of operations such as read/write/transfer and access via WAN from Grid centres, university clusters, supercomputers, academic and commercial clouds. The efficiency and performance of the system are demonstrated using synthetic and experiment-specific tests including real data processing and analysis workflows from ATLAS and ALICE experiments, as well as compute-intensive bioinformatics applications (PALEOMIX) running on supercomputers. We present topology and architecture of the designed system, report performance and statistics for different access patterns and show how federated data storage can be used efficiently by physicists and biologists. We also describe how sharing data on a widely distributed storage system can lead to a new computing model and reformations of computing style, for instance how bioinformatics program running on supercomputers can read/write data from the federated storage.

  1. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  2. Brazilian Federal Police drug chemical profiling - the PeQui project.

    Science.gov (United States)

    Zacca, Jorge J; Botelho, Elvio Dias; Vieira, Maurício L; Almeida, Fernanda L A; Ferreira, Luciana S; Maldaner, Adriano O

    2014-07-01

    Over the past six years the Brazilian Federal Police has undertaken major efforts in order to implement and to develop its own drug chemical profiling program. This paper aims to provide a broad perspective regarding the managerial strategies and some examples of subsequent technical issues involved in the implementation of such a project. Close collaboration with local drug enforcement and investigation teams, establishment of proper worldwide partnerships with well recognized institutions in the field of drug analysis and the attainment of suitable funding and human resources are shown to be key success factors. Some preliminary results concerning the chemical profile of cocaine seizures in Brazil during this process are presented. Copyright © 2014 Forensic Science Society. Published by Elsevier Ireland Ltd. All rights reserved.

  3. The Cc1 ProjectSystem For Private Cloud Computing

    Directory of Open Access Journals (Sweden)

    J Chwastowski

    2012-01-01

    Full Text Available The main features of the Cloud Computing system developed at IFJ PAN are described. The project is financed from the structural resources provided by the European Commission and the Polish Ministry of Science and Higher Education (Innovative Economy, National Cohesion Strategy. The system delivers a solution for carrying out computer calculations on a Private Cloud computing infrastructure. It consists of an intuitive Web based user interface, a module for the users and resources administration and the standard EC2 interface implementation. Thanks to the distributed character of the system it allows for the integration of a geographically distant federation of computer clusters within a uniform user environment.

  4. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  5. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  6. 2014 Earth System Grid Federation and Ultrascale Visualization Climate Data Analysis Tools Conference Report

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Dean N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-27

    The climate and weather data science community met December 9–11, 2014, in Livermore, California, for the fourth annual Earth System Grid Federation (ESGF) and Ultrascale Visualization Climate Data Analysis Tools (UV-CDAT) Face-to-Face (F2F) Conference, hosted by the Department of Energy, National Aeronautics and Space Administration, National Oceanic and Atmospheric Administration, the European Infrastructure for the European Network of Earth System Modelling, and the Australian Department of Education. Both ESGF and UVCDATremain global collaborations committed to developing a new generation of open-source software infrastructure that provides distributed access and analysis to simulated and observed data from the climate and weather communities. The tools and infrastructure created under these international multi-agency collaborations are critical to understanding extreme weather conditions and long-term climate change. In addition, the F2F conference fosters a stronger climate and weather data science community and facilitates a stronger federated software infrastructure. The 2014 F2F conference detailed the progress of ESGF, UV-CDAT, and other community efforts over the year and sets new priorities and requirements for existing and impending national and international community projects, such as the Coupled Model Intercomparison Project Phase Six. Specifically discussed at the conference were project capabilities and enhancements needs for data distribution, analysis, visualization, hardware and network infrastructure, standards, and resources.

  7. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  8. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  9. Substance abuse treatment management information systems: balancing federal, state, and service provider needs.

    Science.gov (United States)

    Camp, J M; Krakow, M; McCarty, D; Argeriou, M

    1992-01-01

    There is increased interest in documenting the characteristics and treatment outcomes of clients served with Alcohol, Drug Abuse, and Mental Health Block Grant funds. The evolution of federal client-based management systems for substance abuse treatment services demonstrates that data collection systems are important but require continued support. A review of the Massachusetts substance abuse management information system illustrates the utility of a client-based data set. The development and implementation of a comprehensive information system require overcoming organizational barriers and project delays, fostering collaborative efforts among staff from diverse agencies, and employing considerable resources. In addition, the need to develop mechanisms for increasing the reliability of the data and ongoing training for the users is presented. Finally, three applications of the management information system's role in shaping policy are reviewed: developing services for special populations (communities of color, women, and pregnant substance abusers, and injection drug users), utilizing MIS data for evaluation purposes, and determining funding allocations.

  10. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  11. Important project financing by issue of bonds in the Federation of Bosnia and Herzegovina

    Directory of Open Access Journals (Sweden)

    Lazar Dreč

    2016-11-01

    Full Text Available This article deals with the development of the Federation of Bosnia and Herzegovina based on the opening of infrastructure facilities for which funding is proposed to incorporate the issue of securities, primarily government bonds because there is a real basis for its demand deriving by banks, citizens and other organizations and institutions. The basic conditions for the functioning model of financing development and strategic projects by issuing securities herein include: a accelerate reforms and create the legal framework that will allow the establishment of important missing institutions for the business sector, b more efficient functioning of the executive and legislative bodies in Bosnia and Herzegovina on creating a favourable business environment, c the implementation of identified strategic commitment from all levels of government in relation to the creation of a single economic space, labour market, harmonization of entity policies and other policies that influence the overall business environment, d the development of infrastructure projects and power facilities, and e the inclusion of private funding and knowledge aimed at improving the construction and management of roads.

  12. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Science.gov (United States)

    2012-03-09

    ... existing roadway and bridges and reconfigure the study-area freeway system to address safety issues and design deficiencies and provide additional capacity. The project termini are 124th Street on the west... Water Conservation Act as amended [16 U.S.C. 4601], Farmland Protection Policy Act of 1980 [7 U.S.C...

  13. 41 CFR 101-1.101 - Federal Property Management Regulations System.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Federal Property Management Regulations System. 101-1.101 Section 101-1.101 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1...

  14. Progress report projects in the field of nuclear safety sponsered by the Federal Minister for Research and Technology

    International Nuclear Information System (INIS)

    1980-03-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS-Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear energy plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of FBR type reactors are sponsored by the BMFT. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work at the GRS, within the framework of general information of the progress in reactor safety research. The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC and the OECD. (orig./HP) [de

  15. Reports on the research projects in the field of nuclear safety sponsored by the Federal Minister for Research and Technology

    International Nuclear Information System (INIS)

    1979-12-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS - Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of FBR type reactors are sponsored by the BMFT. The CRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS - F - Fortschrittsberichte (GRS - F - Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work. The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT in the near future. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC Communities and the OECD.(orig./HP) [de

  16. Reports on research projects in the field of reactor safety sponsored by the Federal Ministry for research and technology

    International Nuclear Information System (INIS)

    1979-09-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS - Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear power-plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of FBR type reactors are sponsored by the BMFT. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS - F - Fortschrittsberichte (GRS - F - Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work. The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT in the near future. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC Communities and the OECD. (orig.) [de

  17. Reports on the research projects in the field of nuclear safety sponsored by the Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1980-06-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS-Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of FBR type reactors are sponsored by the BMFT. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-progress reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work. The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT, which will appear in the near future. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC and the OECD. (orig./HP) [de

  18. Reports on research projects in the field of reactor safety sponsored by the Federal Minister for Research and Technology

    International Nuclear Information System (INIS)

    1978-09-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS - Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), der Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of FBR type reactors are sponsored by the BMFT. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS - F Fortschrittsberichte (GRS - F - Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work. The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC Communities and the OECD. (orig./HP) 891 HP [de

  19. Reports on research projects sponsored by the Federal Minister for Research and Technology in the field of reactor safety

    International Nuclear Information System (INIS)

    1979-03-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS - Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of FBR type reactors are sponsored by the BMFT. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS - F - Fortschrittsberichte (GRS - F - Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work. The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC European Communities and the OECD. (orig./HP) [de

  20. Report on the projects in the field of reactor safety sponsored by the Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1978-12-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS - Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear power-plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of advanced reactors are sponsored by the BMFT. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS - F - Fortschrittsberichte (GRS - F - Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of the progress in reactor safety research. The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT which will appear in the near future. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC and the OECD. (orig./HP) [de

  1. Report on the research projects in the field of reactor safety sponsored by the Federal Minister for Research and Technology

    International Nuclear Information System (INIS)

    1978-09-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the Research Program Reactor Safety (RS - Projects) are sponsored by the BMFT (Federal Minister for Research and Technology), Bundesminister fuer Forschung und Technologie. Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks first projects on the safety of FBR type reactors are sponsored by the BMFT. The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of quarterly and annually publication of progress reports within the series GRS - F -Fortschrittsberichte (GRS - F - Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work, The individual reports are arranged according to the amended LWR Safety Research Program of the BMFT. Another table contents uses the same classification system as applied in the Nuclear Safety Index of the CEC Communities and the OECD. (orig./HP) 891 HP [de

  2. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  3. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  4. Model of the Russian Federation Construction Innovation System: An Integrated Participatory Systems Approach

    Directory of Open Access Journals (Sweden)

    Emiliya Suprun

    2016-08-01

    Full Text Available This research integrates systemic and participatory techniques to model the Russian Federation construction innovation system. Understanding this complex construction innovation system and determining the best levers for enhancing it require the dynamic modelling of a number of factors, such as flows of resources and activities, policies, uncertainty and time. To build the foundations for such a dynamic model, the employed study method utilised an integrated stakeholder-based participatory approach coupled with structural analysis (MICMAC—Matrice d'Impacts Croisés Multiplication Appliquée à un Classement Cross-Impact Matrix. This method identified the key factors of the Russian Federation construction innovation system, their causal relationship (i.e., influence/dependence map and, ultimately, a causal loop diagram. The generated model reveals pathways to improving construction innovation in the Russian Federation and underpins the future development of an operationalised system dynamics model.

  5. Clever farmers give gas: model solutions for agricultural biogas systems. Results from the BMVEL (Federal Ministry for Consumers' Protection, Nutrition and Agriculture) model project 2004/2005: Moel solutions for environment-friendly and economical energy utilization with agricultural biogas systems

    International Nuclear Information System (INIS)

    Niebaum, A.; Jaeger, P.

    2005-01-01

    With the examples of biogas system concepts from practical agriculture, farmers, consultants, representatives of authorities and all those interested in biogas are shown successful and proved solutions concepts of generating energy from biogas. The project included agricultural enterprises with biogas systems who have implemented a biologically and technically efficient biomass utilization, who have optimized their operations by means of the biogas system, who have integrated their biogas system in their operational concept and who were able to harmonize the objectives of using a biogas system with the environment and the regional specificities

  6. The Earth System Grid Federation : an Open Infrastructure for Access to Distributed Geospatial Data

    Science.gov (United States)

    Cinquini, Luca; Crichton, Daniel; Mattmann, Chris; Harney, John; Shipman, Galen; Wang, Feiyi; Ananthakrishnan, Rachana; Miller, Neill; Denvil, Sebastian; Morgan, Mark; hide

    2012-01-01

    The Earth System Grid Federation (ESGF) is a multi-agency, international collaboration that aims at developing the software infrastructure needed to facilitate and empower the study of climate change on a global scale. The ESGF's architecture employs a system of geographically distributed peer nodes, which are independently administered yet united by the adoption of common federation protocols and application programming interfaces (APIs). The cornerstones of its interoperability are the peer-to-peer messaging that is continuously exchanged among all nodes in the federation; a shared architecture and API for search and discovery; and a security infrastructure based on industry standards (OpenID, SSL, GSI and SAML). The ESGF software is developed collaboratively across institutional boundaries and made available to the community as open source. It has now been adopted by multiple Earth science projects and allows access to petabytes of geophysical data, including the entire model output used for the next international assessment report on climate change (IPCC-AR5) and a suite of satellite observations (obs4MIPs) and reanalysis data sets (ANA4MIPs).

  7. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1984-01-01

    This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.

  8. The embedded operating system project

    Science.gov (United States)

    Campbell, R. H.

    1985-01-01

    The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.

  9. Federal and State Structures to Support Financing Utility-Scale Solar Projects and the Business Models Designed to Utilize Them

    Energy Technology Data Exchange (ETDEWEB)

    Mendelsohn, M.; Kreycik, C.

    2012-04-01

    Utility-scale solar projects have grown rapidly in number and size over the last few years, driven in part by strong renewable portfolio standards (RPS) and federal incentives designed to stimulate investment in renewable energy technologies. This report provides an overview of such policies, as well as the project financial structures they enable, based on industry literature, publicly available data, and questionnaires conducted by the National Renewable Energy Laboratory (NREL).

  10. Assessing data quality for a federal environmental restoration project: Rationalizing the requirements of multiple clients

    International Nuclear Information System (INIS)

    Kiszka, V.R.; Carlsen, T.M.

    1994-07-01

    Most environmental restoration projects at federal facilities face the difficult task of melding the quality assurance (QA) requirements of multiple clients, as well as dealing with historical data that are often of unknown quality. At Lawrence Livermore National Laboratory (LLNL), we have successfully integrated the requirements of our multiple clients by carefully developing a QA program that efficiently meets our clients' needs. The Site 300 Experimental Test Site is operated by LLNL in support of its national defense program. The responsibility for conducting environmental contaminant investigations and restoration at Site 300 is vested in the Site 300 Environmental Restoration Project (Site 300 ERP) of LLNL's Environmental Restoration Division. LLNL Site 300 ERP must comply with the QA requirements of several clients, which include: the LLNL Environmental Protection Department, the DOE, the US Environmental Protection Agency-Region IX (EPA), the California Regional Water Quality Control Board -- Central Valley Region, and the California Department of Toxic Substances Control. This comprehensive QA program was used to determine the acceptability of historical data. The Site 300 ERP began soil and ground water investigations in 1982. However, we did not begin receiving analytical quality assurance/quality control (QA/QC) data until 1989; therefore, the pre-1989 data that were collected are of unknown quality. The US EPA QAMS-005/80 defines data quality as the totality of features and characteristics of data that bears on its ability to satisfy a given purpose. In the current context, the characteristics of major importance are accuracy, precision, completeness, representativeness, and comparability. Using our established QA program, we determined the quality of this historical data based on its comparability to the post-1989 data. By accepting this historical data, we were able to save a considerable amount of money in recharacterization costs

  11. Medicaid waivers and negotiated federalism in the US: is there relevance to other federal systems?

    Science.gov (United States)

    Weissert, Carol S; Weissert, William G

    2017-01-01

    Medicaid waivers have been a principal tool of innovation in health policy in the US since at least the mid 1970s. As Republicans seek to give the states more flexibility in their implementation and management of both Medicaid and the Affordable Care Act or its replacement, waiver authority is likely to be one of the key work arounds for avoiding political barriers in the US Senate. While block-granting Medicaid may require 60 senate votes, waiver authority already exists in both Medicaid law and the Affordable Care Act. Waivers also have great potential for application in other federal nations. Yet there is no theory to explain the way the application and review process evolves or the factors likely to shape the outcome. After a discussion of the theoretical underpinnings of what we call 'negotiated federalism', we apply it to examples of Medicaid waivers to see if the theory's key elements - politics, party congruence, leverage, credit taking and experience - offer a useful perspective on this federal-state interaction so important to health policy.

  12. Nuclear and radiation safety assurance federal target programme management system

    International Nuclear Information System (INIS)

    Kryukov, O.V.; Vasil'ev, V.A.; Nikishin, D.A.; Linge, I.I.; Obodinskij, A.N.

    2012-01-01

    The Federal Program Nuclear and Radiation Safety Assurance for 2008-2015 is presented. Specifics of Federal target program management as well as changes to program management are discussed. Data on evaluation of management effectiveness is given. Further efforts to resolve the nuclear legacy problem in Russia are also presented [ru

  13. 42 CFR 137.291 - May Self-Governance Tribes carry out construction projects without assuming these Federal...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes carry out construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.291 May Self-Governance Tribes carry out construction projects without assuming these Federal environmental...

  14. 25 CFR 1000.246 - Must an AFA that contains a construction project or activity incorporate provisions of Federal...

    Science.gov (United States)

    2010-04-01

    ... as possible in the construction process. If Tribal construction standards are consistent with or... 25 Indians 2 2010-04-01 2010-04-01 false Must an AFA that contains a construction project or activity incorporate provisions of Federal construction standards? 1000.246 Section 1000.246 Indians OFFICE...

  15. 14 CFR Special Federal Aviation... - Air Traffic Control System Emergency Operation

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Air Traffic Control System Emergency Operation Federal Special Federal Aviation Regulation No. 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Pt. 91, SFAR No. 60...

  16. Portable Data Acquisition System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Armstrong researchers have developed a portable data acquisition system (PDAT) that can be easily transported and set up at remote locations to display and archive...

  17. Facilities projects performance measurement system

    International Nuclear Information System (INIS)

    Erben, J.F.

    1979-01-01

    The two DOE-owned facilities at Hanford, the Fuels and Materials Examination Facility (FMEF), and the Fusion Materials Irradiation Test Facility (FMIT), are described. The performance measurement systems used at these two facilities are next described

  18. 78 FR 47018 - Civil Service Retirement System and Federal Employees' Retirement System; Opportunity for...

    Science.gov (United States)

    2013-08-02

    ... System; Opportunity for Annuitants to Elect Survivor Annuity Benefits for Same-Sex Spouses AGENCY: Office... survivor annuities for their spouses under the Civil Service Retirement System (CSRS) and Federal Employees... survivor annuities for their spouses based on their recognized marital status. FOR FURTHER INFORMATION...

  19. Implementing polytope projects for smart systems

    CERN Document Server

    Iordache, Octavian

    2017-01-01

    This book presents a domain of extreme industrial and scientific interest: the study of smart systems and structures. It presents polytope projects as comprehensive physical and cognitive architectures that support the investigation, fabrication and implementation of smart systems and structures. These systems feature multifunctional components that can perform sensing, control, and actuation. In light of the fact that devices, tools, methodologies and organizations based on electronics and information technology for automation, specific to the third industrial revolution, are increasingly reaching their limits, it is essential that smart systems be implemented in industry. Polytope projects facilitate the utilization of smart systems and structures as key elements of the fourth industrial revolution. The book begins by presenting polytope projects as a reference architecture for cyber-physical systems and smart systems, before addressing industrial process synthesis in Chapter 2. Flow-sheet trees, cyclic sep...

  20. State, federal, nuclear interface: projected AFR needs to year 2000. Executive conference

    International Nuclear Information System (INIS)

    King, F.D.

    1981-01-01

    This paper discusses the requirements for additional storage based on various assumptions concerning the plans of nuclear utilities for fuel storage. The data used for the storage projections are being used by the Department of Energy in planning fuel storage, waste disposal operations, and facility requirements; they are also used in evaluating the environmental impacts of waste operations, in calculating the need for waste transport systems, and to set fees to be charged for spent fuel storage and disposal. The most probable demand for AFR storage of spent fuel from domestic reactors in the near term (before 1990) is projected to be approximately 1800 MT. This value is expected to increase rapidly to a total of over 16,000 MT by the year 2000. It is improbable that AFR storage requirements will exceed 22,000 MT by the year 2000 or (assuming reprocessing does not occur) that they will be less than 14,000 MT. Most of the AFR demand will occur after 1985, but a few reactors will operate without sufficient storage space to effect a full core discharge before then. Currently five reactors are without such space, but plans are for them to regain it. These AFR storage projections are significantly lower than prior projections. The decrease in near term storage demands is mainly due to the utilities planning or implementing intrasite fuel movements (onsite transfers) or intra-utility shipments (transshipments) and pool capacity expansions. The longer term decreases in spent fuel storage needs result from delays in the startup of committed reactors and the planned use of longer reactor fuel cycles (increased fuel exposure). The decreased demand for AFR storage is compatible with the previously announced delays in providing government AFR facilities and decreases the projected number of reactors that might be forced to operate without capacity for a full core discharge

  1. The Undergraduate Medical Education for the 21st Century (UME-21) project: the Federal Government perspective.

    Science.gov (United States)

    Bazell, Carol; Davis, Howard; Glass, Jerilyn; Rodak, John; Bastacky, Stanford M

    2004-01-01

    The Undergraduate Medical Education for the 21st Century (UME-21) project was implemented by the Division of Medicine, Bureau of Health Professions, Health Resources and Services Administration (HRSA) to encourage medical schools to collaborate with managed care organizations and others. The purpose of the collaboration was to ensure that medical students are prepared to provide quality patient care and manage that care in an integrated health care system in which the cost of care and use of empirically justified care are important elements. The UME-21 project represents a continuation of HRSA's interest in the managed care arena. The UME-21 project involved the collaboration of eight partner schools and 10 associate partner schools, together with 50 external partners, to develop innovative curricula that integrated UME-21 content from nine special areas as learning objectives. This project demonstrated that concerted efforts by the leadership in medical education can bring about innovative change in medical school curricula. It ís also demonstrated that faculty of the three primary care disciplines of family medicine, general internal medicine, and general pediatrics were able to cooperate to accomplish such change by working together to allocate clerkship time and content. An important lesson learned in this project was that significant innovations in medical school curricula could be accomplished with a broadbased commitment and involvement of both faculties across the three primary care disciplines and top administrative officials of the medical school. It is uncertain, however, if the innovations achieved will produce further changes or if those changes achieved can be sustained without continued funding.

  2. Health-systems efficiency in the Russian Federation: tuberculosis control.

    Science.gov (United States)

    Floyd, Katherine; Hutubessy, Raymond; Samyshkin, Yevgeniy; Korobitsyn, Alexei; Fedorin, Ivan; Volchenkov, Gregory; Kazeonny, Boris; Coker, Richard; Drobniewski, Francis; Jakubowiak, Wieslaw; Shilova, Margarita; Atun, Rifat A.

    2006-01-01

    OBJECTIVE: To conduct a comprehensive assessment of the case-mix of patients admitted to tuberculosis hospitals and the reasons for their admission in four Russian regions: Ivanovo, Orel, Samara and Vladimir. We also sought to quantify the extent to which efficiency could be improved by reducing hospitalization rates and re-profiling hospital beds available in the tuberculosis-control system. METHODS: We used a standard questionnaire to determine how beds were being used and who was using the beds in tuberculosis facilities in four Russian regions. Data were collected to determine how 4306 tuberculosis beds were utilized as well as on the socioeconomic and demographic indicators, clinical parameters and reasons for hospitalization for 3352 patients. FINDINGS: Of the 3352 patients surveyed about 70% were male; the average age was 40; and rates of unemployment, disability and alcohol misuse were high. About one-third of beds were occupied by smear-positive or culture-positive tuberculosis patients; 20% were occupied by tuberculosis patients who were smear-negative and/or culture-negative; 20% were occupied by patients who no longer had tuberculosis; and 20% were unoccupied. If clinical and public health admission criteria were applied then < 50% of admissions would be justified and < 50% of the current number of beds would be required. Up to 85% of admissions and beds were deemed to be necessary when social problems and poor access to outpatient care were considered along with clinical and public health admission criteria. CONCLUSION: Much of the Russian Federation's large tuberculosis hospital infrastructure is unnecessary when clinical and public health criteria are used, but the large hospital infrastructure within the tuberculosis-control system has an important social support function. Improving the efficiency of the system will require the reform of health-system norms and regulations as they relate to resource allocation and clinical care and implementation of

  3. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  4. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  5. Procedure for Electronic Management of Rulemaking and Other Docketed Records in the Federal Docket Management System

    Science.gov (United States)

    This procedure identifies the specific requirements, processes and supporting documents EPA uses to electronically manage rulemaking and other docketed records in the Federal Docket Management System (FDMS).

  6. Federal Emergency Management Information System (FEMIS) Installation Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Downing, Timothy R.(BATTELLE (PACIFIC NW LAB)); Dunkle, Julie R.(BATTELLE (PACIFIC NW LAB)); Homer, Brian J.(BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Installation Guide provides instructions for installing and configuring the FEMIS software package.

  7. 23 CFR 970.214 - Federal lands congestion management system (CMS).

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Federal lands congestion management system (CMS). 970....214 Federal lands congestion management system (CMS). (a) For purposes of this section, congestion...) Develop criteria to determine when a CMS is to be implemented for a specific transportation system; and (2...

  8. 23 CFR 972.214 - Federal lands congestion management system (CMS).

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Federal lands congestion management system (CMS). 972... § 972.214 Federal lands congestion management system (CMS). (a) For purposes of this section, congestion... interference. For those FWS transportation systems that require a CMS, in both metropolitan and non...

  9. 75 FR 15620 - Federal Motor Vehicle Safety Standards; Air Brake Systems

    Science.gov (United States)

    2010-03-30

    ... fully develop improved brake systems and also to ensure vehicle control and stability while braking... [Docket No. NHTSA 2009-0175] RIN 2127-AK62 Federal Motor Vehicle Safety Standards; Air Brake Systems... Federal motor vehicle safety standard for air brake systems by requiring substantial improvements in...

  10. 76 FR 44829 - Federal Motor Vehicle Safety Standards; Air Brake Systems

    Science.gov (United States)

    2011-07-27

    ... [Docket No. NHTSA-2009-0175] RIN 2127-AK84 Federal Motor Vehicle Safety Standards; Air Brake Systems... final rule that amended the Federal motor vehicle safety standard for air brake systems by requiring... between Bendix Commercial Vehicle Systems and Dana Corporation; and ArvinMeritor. The agency received four...

  11. 78 FR 9623 - Federal Motor Vehicle Safety Standards; Air Brake Systems

    Science.gov (United States)

    2013-02-11

    ... initial speeds, vehicle manufacturers will need to develop unique or complicated braking systems to comply... [Docket No. NHTSA-2013-0011] RIN 2127-AL11 Federal Motor Vehicle Safety Standards; Air Brake Systems... rule that amended the Federal motor vehicle safety standard for air brake systems by requiring...

  12. 76 FR 28855 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration

    Science.gov (United States)

    2011-05-18

    ...; Business Systems-- Definition and Administration; Interim Rule #0;#0;Federal Register / Vol. 76 , No. 96...-AG58 Defense Federal Acquisition Regulation Supplement; Business Systems--Definition and Administration... an initial proposed rule for Business Systems-- Definition and Administration (DFARS Case 2009-D038...

  13. 75 FR 76692 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Science.gov (United States)

    2010-12-09

    ..., and 252 RIN 0750-AG58 Defense Federal Acquisition Regulation Supplement; Business Systems--Definition... for Business Systems--Definition and Administration (DFARS Case 2009-D038) in the Federal Register on... improve the effectiveness of DoD oversight of contractor business systems. The comment period is being...

  14. Model of the Russian Federation Construction Innovation System: An Integrated Participatory Systems Approach

    OpenAIRE

    Emiliya Suprun; Oz Sahin; Rodney A. Stewart; Kriengsak Panuwatwanich

    2016-01-01

    This research integrates systemic and participatory techniques to model the Russian Federation construction innovation system. Understanding this complex construction innovation system and determining the best levers for enhancing it require the dynamic modelling of a number of factors, such as flows of resources and activities, policies, uncertainty and time. To build the foundations for such a dynamic model, the employed study method utilised an integrated stakeholder-based participatory ap...

  15. DIstributed VIRtual System (DIVIRS) Project

    Science.gov (United States)

    Schorr, Herbert; Neuman, B. Clifford; Gaines, Stockton R.; Mizell, David

    1996-01-01

    The development of Prospero moved from the University of Washington to ISI and several new versions of the software were released from ISI during the contract period. Changes in the first release from ISI included bug fixes and extensions to support the needs of specific users. Among these changes was a new option to directory queries that allows attributes to be returned for all files in a directory together with the directory listing. This change greatly improves the performance of their server and reduces the number of packets sent across their trans-pacific connection to the rest of the internet. Several new access method were added to the Prospero file method. The Prospero Data Access Protocol was designed, to support secure retrieval of data from systems running Prospero.

  16. 77 FR 11355 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Science.gov (United States)

    2012-02-24

    ...D published an initial proposed rule for Business Systems-- Definition and Administration (DFARS... the definition and administration of contractor business systems as follows: A. Contractor business..., 245, and 252 RIN 0750-AG58 Defense Federal Acquisition Regulation Supplement; Business Systems...

  17. A preliminary look at the impacts of warming on the federal Columbia River power system

    International Nuclear Information System (INIS)

    Stephan, N.

    2008-01-01

    Studies have indicated that the precipitation changes resulting from climatic warming are unlikely to be distinguishable from natural variability until late in the 21. century. This study presented scenarios and projected changes for the Federal Columbia River power system that used volume and runoff data in monthly time-steps. A streamflow model of data from the previous 44 years was also used. The region is currently meeting 50 per cent of its loads with clean hydro-generation, and is now examining ways of limiting greenhouse gas (GHG) emissions as electricity loads continue to grow. The impacts of climate change were compared with projected loads up to the year 2040. Flow targets for regional fish operations peak between April and July. Volume changes in water as a result of hydroelectricity projects in the region have also been simulated. Monitoring tools and meteorological data were presented as well as watershed run-off data from 1929 to 2008. Policies related to climate change continue to be challenged by both legal and political issues as well as a lack of strategic planning. It was concluded that accurate system modelling is needed to avoid the impacts of costly and un-informed decision-making processes. tabs., figs

  18. Conceptions of Software Development by Project Managers: A Study of Managing the Outsourced Development of Software Applications for United States Federal Government Agencies

    Science.gov (United States)

    Eisen, Daniel

    2013-01-01

    This study explores how project managers, working for private federal IT contractors, experience and understand managing the development of software applications for U.S. federal government agencies. Very little is known about how they manage their projects in this challenging environment. Software development is a complex task and only grows in…

  19. Swiss Federal energy research - project list 2006/2007; Projektliste der Energieforschung des Bundes 2006/2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-03-15

    This comprehensive report for the Swiss Federal Office of Energy (SFOE) lists and classifies the 1,025 energy-relevant research projects carried out in the years 2006 and 2007. Those projects are listed that were supported and/or financed with Swiss or European public funding. Details of the contributions made by private enterprises are noted and discussed. It is also noted that the Swiss Federal Office of Energy operates a data bank with a systematic collection of around 9,200 publications on research projects. Statistics on the classification of the projects are presented, as are details of funding for the years 1990 to 2007. The sources of financing and the distribution of the means over the various areas of research are looked at. The number of persons active in the research work is discussed. A comparison is made with the research programs of other countries. The list of projects is split into four categories - efficient use of energy, renewable energy resources, nuclear energy, energy economic basics as well as technology transfer and co-ordination. Finally a comprehensive list of all research projects for the years 2006 and 2007 is presented in tabular form. A list of those responsible for the various areas of research completes the report.

  20. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  1. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  2. UHP lamp systems for projection applications

    International Nuclear Information System (INIS)

    Derra, Guenther; Moench, Holger; Fischer, Ernst; Giese, Hermann; Hechtfischer, Ulrich; Heusler, Gero; Koerber, Achim; Niemann, Ulrich; Noertemann, Folke-Charlotte; Pekarski, Pavel; Pollmann-Retsch, Jens; Ritz, Arnd; Weichmann, Ulrich

    2005-01-01

    Projection systems have found widespread use in conference rooms and other professional applications during the last decade and are now entering the home TV market at a considerable pace. Projectors as small as about one litre are able to deliver several thousand screen lumens and are, with a system efficacy of over 10 lm W -1 , the most efficient display systems realized today. Short arc lamps are a key component for projection systems of the highest efficiency for small-size projection displays. The introduction of the ultra high performance (UHP) lamp system by Philips in 1995 can be identified as one of the key enablers of the commercial success of projection systems. The UHP lamp concept features outstanding arc luminance, a well suited spectrum, long life and excellent lumen maintenance. For the first time it combines a very high pressure mercury discharge lamp with extremely short and stable arc gap with a regenerative chemical cycle keeping the discharge walls free from blackening, leading to lifetimes of over 10 000 h. Since the introduction of the UHP lamp system, many important new technology improvements have been realized: burner designs for higher lamp power, advanced ignition systems, miniaturized electronic drivers and innovative reflector concepts. These achievements enabled the impressive increase of projector light output, a remarkable reduction in projector size and even higher optical efficiency in projection systems during the last years. In this paper the concept of the UHP lamp system is described, followed by a discussion of the technological evolution the UHP lamp has undergone so far. Last, but not least, the important improvements of the UHP lamp system including the electronic driver and the reflector are discussed. (review article)

  3. Local IRBs vs. federal agencies: shifting dynamics, systems, and relationships.

    Science.gov (United States)

    Klitzman, Robert L

    2012-07-01

    How IRBs relate to federal agencies, and the implications of these relationships, have received little, if any, systematic study. I interviewed 46 IRB chairs, directors, administrators, and members, contacting the leadership of 60 U.S. IRBs (every fourth one in the list of the top 240 institutions by NIH funding), interviewing IRB leaders from 34 (response rate=55%). IRBs describe complex direct and indirect relationships with federal agencies that affect IRBs through audits, guidance documents, and other communications, and can generate problems and challenges. Researchers often blame IRBs for frustrations, but IRBs often serve as the "local face" of federal regulations and agencies and are "stuck in the middle." These data have critical implications for policy, practice, and research.

  4. The potential application of military fleet scheduling tools to the Federal Waste Management System Transportation System

    International Nuclear Information System (INIS)

    Harrison, I.G.; Pope, R.B.; Kraemer, R.D.; Hilliard, M.R.

    1991-01-01

    This paper discusses the feasibility of adapting concepts and tools that were developed for the US military's transportation management systems to the management of the Federal Waste Management System's (FWMS) Transportation System. Many of the lessons in the development of the planning and scheduling software for the US military are applicable to the development of similar software for the FWMS Transportation System. The resulting system would be invaluable to the US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM), both initially, for long-range planning, and later, in day-to-day scheduling and management activities

  5. 76 FR 81011 - Notice of Final Federal Agency Actions on Proposed Light Rail Project in Washington

    Science.gov (United States)

    2011-12-27

    ... startup operations. The actions by the Federal agencies, and the laws under which such actions were taken... Assistance and Real Property Acquisition Policies Act of 1970, as amended [42 U.S.C. 61]. 7. Wetlands and...

  6. 76 FR 70321 - Prevailing Rate Systems; Abolishment of Cumberland, ME, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2011-11-14

    ... Cumberland, ME, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel... abolish the Cumberland, Maine, nonappropriated fund (NAF) Federal Wage System (FWS) wage area and redefine Cumberland, Kennebec, and Penobscot Counties, ME, to the York, ME, NAF wage area. Aroostook, Hancock, Knox...

  7. 77 FR 11383 - Prevailing Rate Systems; Abolishment of Monmouth, NJ, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2012-02-27

    ... Monmouth, NJ, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel... abolish the Monmouth, New Jersey, nonappropriated fund (NAF) Federal Wage System (FWS) wage area and redefine Monmouth County, NJ, to the Burlington, NJ, NAF wage area. These changes are necessary because the...

  8. ANALYSIS OF THE CURRENT STATE OF THE BUDGET SYSTEM OF THE RUSSIAN FEDERATION

    Directory of Open Access Journals (Sweden)

    Vladimir V. Bandurin

    2015-01-01

    Full Text Available The article analyzes the budgetary system of the Russian Federation. The elements of the budgetary system and the types of fiscal federalism. Particular attention is paid to the problem of the audit (control budget formulation and execution, the external and internal state financial control. 

  9. 23 CFR 971.214 - Federal lands congestion management system (CMS).

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Federal lands congestion management system (CMS). 971... Federal lands congestion management system (CMS). (a) For purposes of this section, congestion means the...) Develop criteria to determine when a CMS is to be implemented for a specific FH; and (2) Have CMS coverage...

  10. 76 FR 59256 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Science.gov (United States)

    2011-09-26

    ...; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2012; Changes in Size... [CMS-1349-CN] RIN 0938-AQ28 Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2012; Changes in Size and Square Footage of Inpatient Rehabilitation Units...

  11. 76 FR 55825 - Federal Motor Vehicle Safety Standards, Child Restraint Systems

    Science.gov (United States)

    2011-09-09

    ... [Docket No. NHTSA-2011-0139] RIN 2127-AJ44 Federal Motor Vehicle Safety Standards, Child Restraint Systems..., amends a provision in Federal Motor Vehicle Safety Standard No. 213, ``Child restraint systems,'' that... provision: When a motor vehicle safety standard is in effect under this chapter, a State or a political...

  12. The Geodetic Seamless Archive Centers Service Layer: A System Architecture for Federating Geodesy Data Repositories

    Science.gov (United States)

    McWhirter, J.; Boler, F. M.; Bock, Y.; Jamason, P.; Squibb, M. B.; Noll, C. E.; Blewitt, G.; Kreemer, C. W.

    2010-12-01

    Three geodesy Archive Centers, Scripps Orbit and Permanent Array Center (SOPAC), NASA's Crustal Dynamics Data Information System (CDDIS) and UNAVCO are engaged in a joint effort to define and develop a common Web Service Application Programming Interface (API) for accessing geodetic data holdings. This effort is funded by the NASA ROSES ACCESS Program to modernize the original GPS Seamless Archive Centers (GSAC) technology which was developed in the 1990s. A new web service interface, the GSAC-WS, is being developed to provide uniform and expanded mechanisms through which users can access our data repositories. In total, our respective archives hold tens of millions of files and contain a rich collection of site/station metadata. Though we serve similar user communities, we currently provide a range of different access methods, query services and metadata formats. This leads to a lack of consistency in the userís experience and a duplication of engineering efforts. The GSAC-WS API and its reference implementation in an underlying Java-based GSAC Service Layer (GSL) supports metadata and data queries into site/station oriented data archives. The general nature of this API makes it applicable to a broad range of data systems. The overall goals of this project include providing consistent and rich query interfaces for end users and client programs, the development of enabling technology to facilitate third party repositories in developing these web service capabilities and to enable the ability to perform data queries across a collection of federated GSAC-WS enabled repositories. A fundamental challenge faced in this project is to provide a common suite of query services across a heterogeneous collection of data yet enabling each repository to expose their specific metadata holdings. To address this challenge we are developing a "capabilities" based service where a repository can describe its specific query and metadata capabilities. Furthermore, the architecture of

  13. Federal Emergency Management Information System (FEMIS) data management guide, version 1.4.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, R.A.; Downing, T.R.; Gaustad, K.L. [and others

    1998-06-26

    The Federal Emergency Management Information System (FEMIS) information resources are described in this FEMIS Data Management Guide. To comprehend what types of data are present, where the data is located, and how it is managed during the life span of the system, a basic understanding of the FEMIS architecture is necessary. The system is being developed by Pacific Northwest National Laboratory (PNNL) and is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). The capability to connect to remote CSEPP sites and share information will be present in a future release. Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide efficient EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links. FEMIS is a client/server system where much of the application software is located in the client PC. This client software integrates the FEMIS application, government furnished dispersion and evacuation models, and Commercial-Off-The-Shelf (COTS) software tools such as the ArcView geographic information system (GIS) and Microsoft Project (electron planning). A UNIX server provides data management services, ARC/INFO GIS capabilities, evacuation (Evac) modeling, electron main (E-mail), and meteorological (Met) input processing. A PC communication utility is available to interface with external subsystems. At this time, the weather collection system (Handar Met System) is the only external subsystem.

  14. 76 FR 32242 - Federal Employees' Retirement System; Normal Cost Percentages

    Science.gov (United States)

    2011-06-03

    ... generally accepted actuarial practices and standards (using dynamic assumptions). Subpart D of part 841 of... changes to the economic assumptions used in the dynamic actuarial valuations of FERS. The Board reviewed... by the federal retirement programs administered by the U.S. Department of Defense and the Social...

  15. Versioning for CMIP6 in the Earth System Grid Federation

    Science.gov (United States)

    Weigel, Tobias; Kindermann, Stephan; Lautenschlager, Michael

    2015-04-01

    The Earth System Grid Federation (ESGF) has been used as the e-infrastructure to provide access to CMIP5 data and is expected to serve CMIP6 data as well. 2015 marks the year of continued planning and preparation where new concepts can still be implemented for the operational phase of CMIP6. A particular concern within ESGF operations is the versioning and automated replication of data. From CMIP5 experience we know that the pathway between initial submission of modelling data to the ESGF data space and quality-controlled long-term archival of the final products is long and far from linear. Data may be retracted, amended and updated, and metadata may accumulate at different stages. It is unrealistic to assume that a simple and straightforward process can be used as a role model to build ESGF services around the different stages data will pass through during the active phase of CMIP6. Nonetheless, at the technical level ESGF requires some form of automated control and management. At the same time, the accountability of data products must be made transparent to guard against misinterpretation, increase user experience and promote open and reproducible science. To address the challenges, first some essential versioning policies must be agreed upon and enforced through technical means and organizational processes. The volatile readiness state of CMIP data cannot be changed as it is given by the users; however its management can be improved. A promising approach is to embed persistent identifiers in all CMIP6 data objects and register them so they can be globally resolved by any user and used as reference points within ESGF management processes. A specific conceptual interpretation and management of such identifiers can ensure that they remain valid and useful even if the data objects change or become unavailable. For this, identifiers must be assigned to individual versions and aggregations, connected with each other and integrated in the existing ESGF publication

  16. Federal Automated Information System of Nuclear Material Control and Accounting: Uniform System of Reporting Documents

    International Nuclear Information System (INIS)

    Pitel, M V; Kasumova, L; Babcock, R A; Heinberg, C

    2003-01-01

    One of the fundamental regulations of the Russian State System for Nuclear Material Accounting and Control (SSAC), ''Basic Nuclear Material Control and Accounting Rules,'' directed that a uniform report system be developed to support the operation of the SSAC. According to the ''Regulation on State Nuclear Material Control and Accounting,'' adopted by the Russian Federation Government, Minatom of Russia is response for the development and adoption of report forms, as well as the reporting procedure and schedule. The report forms are being developed in tandem with the creation of an automated national nuclear material control and accounting system, the Federal Information System (FIS). The forms are in different stages of development and implementation. The first report forms (the Summarized Inventory Listing (SIL), Summarized Inventory Change Report (SICR) and federal and agency registers of nuclear material) have already been created and implemented. The second set of reports (nuclear material movement reports and the special anomaly report) is currently in development. A third set of reports (reports on import/export operations, and foreign nuclear material temporarily located in the Russian Federation) is still in the conceptual stage. To facilitate the development of a unified document system, the FIS must establish a uniform philosophy for the reporting system and determine the requirements for each reporting level, adhering to the following principles: completeness--the unified report system provides the entire range of information that the FIS requires to perform SSAC tasks; requisite level of detail; hierarchical structure--each report is based on the information provided in a lower-level report and is the source of information for reports at the next highest level; consistency checking--reports can be checked against other reports. A similar philosophy should eliminate redundancy in the different reports, support a uniform approach to the contents of

  17. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  18. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  19. Community response to large-scale federal projects: the case of the MX

    International Nuclear Information System (INIS)

    Albrecht, S.L.

    1983-01-01

    An analysis of community response to large-scale defense projects, such as the proposals to site MX missiles in Utah and Nevada, is one way to identify those factors likely to be important in determining community response to nuclear waste repository siting. This chapter gives a brief overview of the MX system's characteristics and the potential impacts it would have had on the rural areas, describes the patterns of community mobilization that occurred in Utah and Nevada, and suggests where this response may parallel community concerns about a repository siting. Three lessons from the MX experience are that local residents, asked to assume a disproportionate share of the negative impacts, should be involved in the siting process, that local residents should be treated as equal, and that compensation should be offered when local residents suffer from political expediency

  20. Reports of reactor safety research projects sponsored by the Federal Ministry for Research and Technology (BMFT)

    International Nuclear Information System (INIS)

    1984-04-01

    Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. the individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by he FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of progress in reactor safety research. The individual reports are classified according to the research program on the safety of LWRS 1977-1980 of the BMFT. Another table of contents uses the same classification system as applied in the nuclear safety index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in the sequence of their project numbers. (orig.) [de

  1. Institutional and Organizational Structure of the Federal Procurement System of the United States

    Directory of Open Access Journals (Sweden)

    Vovchenko Natalya Gennadyevna

    2015-09-01

    Full Text Available The paper deals with the role of the Federal procurement system of the United States as a regulatory tool of the U.S. economy. The scope of research is focused on organizational and institutional aspects of forming and developing the U.S. Federal procurement system. The main purpose of the paper is to study up-to-date mechanism of government acquisition in the United States and to consider all its structural elements taken in conjunction with each other, such as the President, the Office of Management and Budget (OMB, the Office of Federal Procurement Policy (OFPP, the General Services Administration (GSA, other executive and regulatory agencies. The methodological background of the research is based on normative, system-wide, statistical and complex approaches to the study of structural elements of the U.S. Federal procurement system. The theoretical and practical material of the present research can be used in teaching and learning activities at economic faculties, for instance, in the course of lectures on government contacting and public procurement management. It also can be used in training and advanced training of specialists who draft public procurement regulations in the Russian Federation. The statutory regulation of the U.S. Federal procurement system constitutes an organizational framework of executive agencies, their functions and responsibilities, specifics of government control over contract performance, competition requirements and contracting methods. The paper considered interrelated components of the U.S. Federal procurement system, which operates in furtherance of efficient utilization of Federal budget.

  2. 78 FR 53436 - Improving Performance of Federal Permitting and Review of Infrastructure Projects

    Science.gov (United States)

    2013-08-29

    ... projects, and by implementing best-management practices. These best-management practices include... role of the Project Proponent at this stage is to gather initial information to be included in the... Projects AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION...

  3. Regulatory networks, legal federalism, and multi-level regulatory systems

    OpenAIRE

    Kerber, Wolfgang; Wendel, Julia

    2016-01-01

    Transnational regulatory networks play important roles in multi-level regulatory regimes, as e.g, the European Union. In this paper we analyze the role of regulatory networks from the perspective of the economic theory of legal federalism. Often sophisticated intermediate institutional solutions between pure centralisation and pure decentralisation can help to solve complex tradeoff problems between the benefits and problems of centralised and decentralised solutions. Drawing upon the insight...

  4. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  5. Designing and Conducting Health Systems Research Projects ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Home · Resources · Publications. Designing and Conducting Health Systems Research Projects Volume 1: Proposal Development and Fieldwork ... IDRC and the United Kingdom's Global AMR Innovation Fund—managed by the ... New website will help record vital life events to improve access to services for all.

  6. 76 FR 12354 - Cumberland System of Projects

    Science.gov (United States)

    2011-03-07

    ... Third Scenario--Return to Original Marketing Policy Inside TVA Preference Customers Capacity and Base.... Discussion: The marketing policy for the Cumberland System of Projects provides peaking capacity, along with 1500 hours of energy annually with each kilowatt of capacity, to customers outside the Tennessee Valley...

  7. Digital detection systems for projection radiography

    International Nuclear Information System (INIS)

    Schulz, R.F.

    2001-01-01

    This article gives a survey of digital X-ray detection systems for projection radiography. The different principles are compared and some general characteristics are derived. The basic conversion mechanisms in the absorption layers are described. The basic principles of solid state X-ray detectors and their general characteristics are elucidated as well as some similarities with detectors for computed tomography. Some important application and system aspects are considered. An outlook on further possible developments in this field is given. (orig.) [de

  8. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  9. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  10. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  11. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  12. The NASA Advanced Space Power Systems Project

    Science.gov (United States)

    Mercer, Carolyn R.; Hoberecht, Mark A.; Bennett, William R.; Lvovich, Vadim F.; Bugga, Ratnakumar

    2015-01-01

    The goal of the NASA Advanced Space Power Systems Project is to develop advanced, game changing technologies that will provide future NASA space exploration missions with safe, reliable, light weight and compact power generation and energy storage systems. The development effort is focused on maturing the technologies from a technology readiness level of approximately 23 to approximately 56 as defined in the NASA Procedural Requirement 7123.1B. Currently, the project is working on two critical technology areas: High specific energy batteries, and regenerative fuel cell systems with passive fluid management. Examples of target applications for these technologies are: extending the duration of extravehicular activities (EVA) with high specific energy and energy density batteries; providing reliable, long-life power for rovers with passive fuel cell and regenerative fuel cell systems that enable reduced system complexity. Recent results from the high energy battery and regenerative fuel cell technology development efforts will be presented. The technical approach, the key performance parameters and the technical results achieved to date in each of these new elements will be included. The Advanced Space Power Systems Project is part of the Game Changing Development Program under NASAs Space Technology Mission Directorate.

  13. Key Questions on the Obama Administration's 2013 Education Budget Request: Federal Education Budget Project. Issue Brief

    Science.gov (United States)

    New America Foundation, 2012

    2012-01-01

    President Barack Obama submitted his third budget request to Congress on February 13th, 2012. The budget request includes proposed funding levels for all federal programs and agencies in aggregate for the upcoming 10 fiscal years, and specific fiscal year 2013 funding levels for programs subject to the annual appropriations process. It is…

  14. Deploying Electric Vehicles and Electric Vehicle Supply Equipment: Tiger Teams Offer Project Assistance for Federal Fleets

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-02

    To assist federal agencies with the transition to plug-in electric vehicles (PEVs), including battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), FEMP offers technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory’s EVSE Tiger Teams.

  15. 78 FR 26417 - Notice of Final Federal Agency Actions on Transportation Project in Washington State

    Science.gov (United States)

    2013-05-06

    ... the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Interstate 90 (I-90) Snoqualmie Pass... to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the listed... claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: Liana Liu, Area...

  16. Drug Treatment within the U.S. Federal Prison System: Are Treatment Needs Being Met?

    Science.gov (United States)

    van Wormer, Katherine; Persson, Lance Edwards

    2010-01-01

    A large percentage of inmates in the U.S. federal prison system have serious drug problems and are in need of treatment before they return to society. Accordingly, the Federal Bureau of Prisons has revamped substance abuse programming consistent with the latest research and expanded treatment services throughout its institutions. This article…

  17. 48 CFR 504.602-71 - Federal Procurement Data System-Public access to data.

    Science.gov (United States)

    2010-10-01

    ... Government procurement to the public. (b) Fee for direct hook-up. To the extent that a member of the public... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Federal Procurement Data... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration...

  18. 13 CFR 102.23 - Publication in the Federal Register-Notices of systems of records.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Publication in the Federal Register-Notices of systems of records. 102.23 Section 102.23 Business Credit and Assistance SMALL BUSINESS... Federal Register upon establishment or revision a notice of the existence and character of any new or...

  19. Toward server-side, high performance climate change data analytics in the Earth System Grid Federation (ESGF) eco-system

    Science.gov (United States)

    Fiore, Sandro; Williams, Dean; Aloisio, Giovanni

    2016-04-01

    In many scientific domains such as climate, data is often n-dimensional and requires tools that support specialized data types and primitives to be properly stored, accessed, analysed and visualized. Moreover, new challenges arise in large-scale scenarios and eco-systems where petabytes (PB) of data can be available and data can be distributed and/or replicated (e.g., the Earth System Grid Federation (ESGF) serving the Coupled Model Intercomparison Project, Phase 5 (CMIP5) experiment, providing access to 2.5PB of data for the Intergovernmental Panel on Climate Change (IPCC) Fifth Assessment Report (AR5). Most of the tools currently available for scientific data analysis in the climate domain fail at large scale since they: (1) are desktop based and need the data locally; (2) are sequential, so do not benefit from available multicore/parallel machines; (3) do not provide declarative languages to express scientific data analysis tasks; (4) are domain-specific, which ties their adoption to a specific domain; and (5) do not provide a workflow support, to enable the definition of complex "experiments". The Ophidia project aims at facing most of the challenges highlighted above by providing a big data analytics framework for eScience. Ophidia provides declarative, server-side, and parallel data analysis, jointly with an internal storage model able to efficiently deal with multidimensional data and a hierarchical data organization to manage large data volumes ("datacubes"). The project relies on a strong background of high performance database management and OLAP systems to manage large scientific data sets. It also provides a native workflow management support, to define processing chains and workflows with tens to hundreds of data analytics operators to build real scientific use cases. With regard to interoperability aspects, the talk will present the contribution provided both to the RDA Working Group on Array Databases, and the Earth System Grid Federation (ESGF

  20. Generalized projective synchronization between Lorenz system and Chen's system

    International Nuclear Information System (INIS)

    Li Guohui

    2007-01-01

    On the basis of active backstepping design, this paper presents the generalized projective synchronization between two different chaotic systems: Lorenz system and Chen's system. The proposed method combines backstepping methods and active control without having to calculate the Lyapunov exponents and the eigenvalues of the Jacobian matrix, which makes it simple and convenient. Numerical simulations show that this method works very well

  1. PROJECTION OF UNEMPLOYMENT IN SMES THE FEDERAL REPUBLIC OF MEXICO FOR 2012

    Directory of Open Access Journals (Sweden)

    Saúl Robles-Soto

    2016-01-01

    Full Text Available In the mexican economic system the denominated Mypymes conform the microempresas, small companies and medium companies, the small and medium generate 30 % of the total employment, while the microempresas 46 %. This study is made a recount of the Mypymes in Mexico, with emphasis in the year 2010, where were a significant quantity of companies closed its activities, standing out the insecurity /1/, crisis and decrease of the internal market. The study is been of a permanent work with data of the INEGI /2/ for the Applied Economy Laboratory (LAE in the Academic Unit of Economy of the Autonomous University of Zacatecas Mexico, and the Center of Studies of Applied Investigations to the Production and the Services of the Economic and Managerial Sciences Faculty of the Universidad de Oriente in Santiago de Cuba. Also by the classic analysis of regression is projected the possible unemployment the year 2012, based on the prognosis of Mypymes for this stage, which was in an increment in the number of unemployment of 2,54 %. 

  2. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3

    Energy Technology Data Exchange (ETDEWEB)

    Burford, M.J.; Burnett, R.A.; Downing, T.R. [and others

    1996-12-01

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.

  3. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  4. Project Newgate: Morehead State University and Federal Youth Center Institutional Coordination and Cooperation.

    Science.gov (United States)

    Norfleet, Morris L.

    An experimental prison program on a college campus is discussed. The purpose of the project, Project Newgate, is to find innovative ways of helping society's wrongdoers. Problems discussed are: salaries, travel expenses, communications, supplies, personnel training, admission, staff recruitment, and policy formation. (CK)

  5. Data harmonization and federated analysis of population-based studies : the BioSHaRE project

    NARCIS (Netherlands)

    Doiron, Dany; Burton, Paul; Marcon, Yannick; Gaye, Amadou; Wolffenbuttel, Bruce H R; Perola, Markus; Stolk, Ronald P; Foco, Luisa; Minelli, Cosetta; Waldenberger, Melanie; Holle, Rolf; Kvaløy, Kirsti; Hillege, Hans L; Tassé, Anne-Marie; Ferretti, Vincent; Fortier, Isabel

    2013-01-01

    ABSTRACTS BACKGROUND: Individual-level data pooling of large population-based studies across research centres in international research projects faces many hurdles. The BioSHaRE (Biobank Standardisation and Harmonisation for Research Excellence in the European Union) project aims to address these

  6. Projected impacts of federal tax policy proposals on mortality burden in the United States: A microsimulation analysis.

    Science.gov (United States)

    Kim, Daniel

    2018-06-01

    The public health consequences of federal income tax policies that influence income inequality are not well understood. I aimed to project the impacts on mortality of modifying federal income tax structures based on proposals by two recent United States (U.S.) Presidential candidates: Donald Trump and Senator Bernie Sanders. I performed a microsimulation analysis using the latest U.S. Internal Revenue Service public-use tax file with state identifiers (2008 tax year), containing nationally-representative data from 139,651 tax returns. I considered five tax plan scenarios: 1) actual 2008 tax structures; proposals in 2016 by then-candidates 2) Trump and 3) Sanders; 4) a modified Sanders plan with higher top tax rates (75%); and 5) a modified Sanders plan with higher top rates plus revenue redistribution to lower-income households (Trump and Sanders plans, respectively. Under the modified Sanders plan including higher top rates, 68,919 (95% CI: 25,221-113,561) fewer deaths/year are projected. Under the modified Sanders plan with redistribution, 333,504 (95% CI: 192,897-473,787) fewer deaths/year are expected. Policies that both raise federal income tax rates and redistribute tax revenue could confer large reductions in the total number of annual deaths among Americans. In this era of high income inequality and growing public support to address the rich-poor gap, policymakers should consider joint federal tax and redistributive policies as levers to reduce the burden of mortality in the United States. Copyright © 2017 The Author. Published by Elsevier Inc. All rights reserved.

  7. Ecological risk analysis as a key factor in environmental safety system development in the Arctic region of the Russian Federation

    International Nuclear Information System (INIS)

    Bolsunovskaya, Y A; Bolsunovskaya, L M

    2015-01-01

    Due to specific natural and climatic conditions combined with human intervention, the Arctic is regarded as a highly sensitive region to any environmental pressures. Arctic projects require continuous environmental monitoring. This poses for the government of the Russian Federation (RF) a tremendous task concerning the formation and implementation of sustainable nature management policy within the international framework. The current article examines the basic constraints to the effective ecological safety system implementation in the Arctic region of the RF. The ecological risks and their effects which influence the sustainable development of the region were analyzed. The model of complex environmental safety system was proposed

  8. [Method for projecting indicators for the goals of the Strategic Action Plan for Tackling Chronic Non-Communicable Diseases in Brazil according to Capitals and the Federal District].

    Science.gov (United States)

    Bernal, Regina Tomie Ivata; Malta, Deborah Carvalho; Iser, Betine Pinto Moehlecke; Monteiro, Rosane Aparecida

    2016-01-01

    to present the indicators' projection method of the Strategic Action Plan for Tackling Chronic Non-Communicable Diseases (NCDs) in Brazilian State capitals and the Federal District, 2012-2022. simple linear regression model was used to calculate the indicators' projections with data from the Surveillance System of Risk and Protective Factors for Chronic Diseases by Telephone Survey (Vigitel). in most of the capitals, there was an increase in the prevalence of obesity (annual change: 0.36%;1.29%), overweight (annual change: 1.11%;2.00%), recommended (annual change: 1.45%;2.66%) and regular (annual change: 0.45%;1.46%) consumption of fruits and vegetables; smoking presented a decreasing trend (annual change: -1.34%;-0.20%); whereas physical inactivity, heavy drinking and mammography and Pap smears examinations were stable. most of the goals are possible; however, effective actions are necessary, especially for tackling overweight and heavy drinking.

  9. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  10. The GEM Detector projective alignment simulation system

    International Nuclear Information System (INIS)

    Wuest, C.R.; Belser, F.C.; Holdener, F.R.; Roeben, M.D.; Paradiso, J.A.; Mitselmakher, G.; Ostapchuk, A.; Pier-Amory, J.

    1993-01-01

    Precision position knowledge (< 25 microns RMS) of the GEM Detector muon system at the Superconducting Super Collider Laboratory (SSCL) is an important physics requirement necessary to minimize sagitta error in detecting and tracking high energy muons that are deflected by the magnetic field within the GEM Detector. To validate the concept of the sagitta correction function determined by projective alignment of the muon detectors (Cathode Strip Chambers or CSCs), the basis of the proposed GEM alignment scheme, a facility, called the ''Alignment Test Stand'' (ATS), is being constructed. This system simulates the environment that the CSCs and chamber alignment systems are expected to experience in the GEM Detector, albeit without the 0.8 T magnetic field and radiation environment. The ATS experimental program will allow systematic study and characterization of the projective alignment approach, as well as general mechanical engineering of muon chamber mounting concepts, positioning systems and study of the mechanical behavior of the proposed 6 layer CSCs. The ATS will consist of a stable local coordinate system in which mock-ups of muon chambers (i.e., non-working mechanical analogs, representing the three superlayers of a selected barrel and endcap alignment tower) are implemented, together with a sufficient number of alignment monitors to overdetermine the sagitta correction function, providing a self-consistency check. This paper describes the approach to be used for the alignment of the GEM muon system, the design of the ATS, and the experiments to be conducted using the ATS

  11. The Borrower's Guide to Financing Solar Energy Systems - A Federal Overview

    Energy Technology Data Exchange (ETDEWEB)

    Eiffert, P.

    1999-03-30

    This booklet describes authorized lending programs and loan guarantees provided by Fannie Mae, Freddie Mac and several Federal agencies, including DOE, that consumers and businesses can use to finance solar heat or electric systems and energy efficient mortgages.

  12. Report: Wells Band Council Needs to Improve Its Accounting System to Comply With Federal Regulations

    Science.gov (United States)

    Report #14-2-0316, July 14, 2014. The Wells Band Council’s accounting system did not comply with federal regulations, which resulted in $390,000 of questioned costs and proposed high-risk designation for the grantee.

  13. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  14. Wave, Tidal, and In-Stream Energy Projects: Which Federal Agency Has the Lead?

    National Research Council Canada - National Science Library

    Lane, Nic

    2007-01-01

    .... The Department of the Interior's Minerals Management Service (MMS) indicates that the Energy Policy Act of 2005, 388, gave it authority as the lead agency for projects proposed on the Outer Continental Shelf (OCS...

  15. Wave, Tidal, and In-Stream Energy Projects: Which Federal Agency Has the Lead

    National Research Council Canada - National Science Library

    Lane, Nic

    2008-01-01

    .... The Department of the Interior's Minerals Management Service (MMS) indicates that the Energy Policy Act of 2005, and 388, gave it authority as the lead agency for projects proposed on the Outer Continental Shelf (OCS...

  16. Surveys of research projects concerning nuclear facility safety, financed by the Federal Ministry of the Interior

    International Nuclear Information System (INIS)

    1986-05-01

    Each progress report is a collection of individual reports, categorized by subject matter. They are a documentation of the contractor's progress, rendered by themselves on standardized forms, published, for the sake of general information on progress made in investigations concerning reactor safety, by the project attendance department of the GRS. The individual reports have serial numbers. Each report includes particulars of the objective, work carried out, results obtained and plans for project continuation. (orig./HP) [de

  17. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  18. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Federal Republic of Germany

    International Nuclear Information System (INIS)

    1977-10-01

    The Federal Republic of Germany is situated in Central Europe. It covers an area of 250,000 square kilometres and has a population of 60 millions. The Federal Republic consists of 10 individual states. The capital of the country is Bonn. The northern and northwestern parts of the country are formed of flat lowlands, the Norddeutsche Tiefebene. Towards the south follow hilly and mountainous regions with elevations not exceeding 1000 m. In the southwestern and southeastern regions the elevations may reach 1500m in the Black Forest and Bayerischer Wald. The foreland of the Alps and the northern part of the Alps itself with elevations close to 3000 m make up the southern part of the Federal Republic. The main rivers - Rhine, Weser and Elbe - are directed towards northwest and drain the country to the North Sea. Only the southern part is drained by the southeast running river Danube. The climate is moderate, generally with frequent snow during the winter season and warm periods during the summer. The precipitation is distributed uniformly throughout the year. Due to the high industrialization a dense network of railroads, highways and motorroads exists.According to what is geologically known about the country, the chances for the discovery of large quantities of low-coast uranium resources must be considered to be limited. The potential for new discoveries of those deposits can be estimated to be around 10 000 t U. The potential for very low-grade uranium ore, such as granites, low-grade sedimentary rocks (sandstones, shales) can be estimated to range between 10,000 - 50,000 t U or possibly more taking into account very low-grade concentrations in shales. This material is not mineable under present conditions. Environmental considerations may prevent mining in the future

  19. A federation of simulations based on cellular automata in cyber-physical systems

    Directory of Open Access Journals (Sweden)

    Hoang Van Tran

    2016-02-01

    Full Text Available In cyber-physical system (CPS, cooperation between a variety of computational and physical elements usually poses difficulties to current modelling and simulation tools. Although much research has proposed to address those challenges, most solutions do not completely cover uncertain interactions in CPS. In this paper, we present a new approach to federate simulations for CPS. A federation is a combination of, and coordination between simulations upon a standard of communication. In addition, a mixed simulation is defined as several parallel simulations federated in a common time progress. Such simulations run on the models of physical systems, which are built based on cellular automata theory. The experimental results are performed on a federation of three simulations of forest fire spread, river pollution diffusion and wireless sensor network. The obtained results can be utilized to observe and predict the behaviours of physical systems in their interactions.

  20. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  1. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  2. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  3. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  4. Banking system and financial monitoring in Russian Federation

    Directory of Open Access Journals (Sweden)

    Osipov A.V.

    2017-04-01

    Full Text Available the article explores the definition of banking system and financial monitoring. Attention is emphasizes on role of internal control in aspect their relation to contraction to money laundering and financing of terrorism/ Internal control is analises from the point of view law, economic and management. Basic attention in the article author emphasizes on work of systems of financial monitoring in organizations.

  5. Federal response to the environmental assessment report of the NRCB-CEAA joint review panel on the Little Bow project/Highwood diversion plan

    International Nuclear Information System (INIS)

    1999-01-01

    In June 1998, a joint review panel released a report on a dam and diversion project proposed by Alberta Public Works, Supply and Services. This document is the response to that report addressing its recommendations to the federal government and other recommendations or statements pertinent to federal areas of jurisdiction and interest. It begins with background on the proposed project, then presents the report's recommendations or statements along with the federal responses with regard to the following issue areas: Regulatory approval; navigable waters and the public right of navigation; fish and fish habitat; wetlands and wildlife; and Aboriginal concerns

  6. 75 FR 23152 - Board of Directors of Federal Home Loan Bank System Office of Finance

    Science.gov (United States)

    2010-05-03

    ...Governed by the Federal Housing Finance Agency's (FHFA) regulations, the Federal Home Loan Bank System's (Bank System) Office of Finance issues debt (``consolidated obligations'') as agent for the Federal Home Loan Banks (Banks) on which the Banks are jointly and severally liable and publishes combined financial reports on the Banks so that members of the Bank System, investors in the consolidated obligations, and other interested parties can assess the strength of the Bank System that stands behind them. The Office of Finance (OF) is governed by a board of directors, the composition and functions of which are determined by FHFA's regulations. FHFA's experience with the Bank System and with the OF's combined financial reports during the recent period of market stress suggests that the OF and the Bank System could benefit from a reconstituted board and strengthened audit committee. This regulation is intended to achieve that end.

  7. The federated ontology of the pal project interfacing ontologies and integrating time-dependent data

    NARCIS (Netherlands)

    Krieger, H.U.; Peters, R.; Kiefer, B.; Van Bekkum, M.A.; Kaptein, F.; Neerincx, M.A.

    2016-01-01

    This paper describes ongoing work carried out in the European project PAL which will support childre in their diabetes self-management as well as assist health professionals and parents involved in the diabete regimen of the child. Here, we will focus on the construction of the PAL ontology which

  8. A ASSISTÊNCIA EDUCACIONAL NO SISTEMA PENITENCIÁRIO FEDERAL – A PENITENCIÁRIA FEDERAL EM PORTO VELHO/RO. EDUCATIONAL ASSISTANCE IN FEDERAL PRISON SYSTEM – A FEDERAL PRISON IN PORTO VELHO/RO, BRAZIL

    Directory of Open Access Journals (Sweden)

    Stephane Silva de Araujo.

    2013-05-01

    Full Text Available No Brasil, a educação é um direito de todos. Assim, a Lei de Execução Penal Brasileira determina a obrigatoriedade de o Estado garantir este direito também às pessoas privadas de liberdade. A fim de executar a política educacional e providenciar o cumprimento de outros preceitos legais, em 2009, o Sistema Penitenciário Federal lotou Pedagogos com formação de nível superior em seu quadro funcional. Considerando os instrumentos normativos existentes, os mencionados profissionais constituíram parcerias com instituições educacionais para que o direito à educação de qualidade fosse efetivado no interior das Penitenciárias Federais. Este artigo apresenta um relato de experiência acerca da Assistência Educacional desenvolvida na Penitenciária Federal em Porto Velho/Rondônia, com alguns dos presos considerados mais perigosos do país. Tem-se como objetivo focalizar a inserção da Educação no interior de uma Penitenciária Federal, através de parcerias que vêm sendo executadas e alcançam atualmente índices diversos das demais prisões brasileiras, proporcionando assim, gradual inserção social dos apenados.In Brazil, education is a right for all. Thus, the Brazilian criminal law determines the obligation of the State to guarantee this right also to people who are deprived of freedom. To implement educational policy and provide compliance with other law principles, in 2009, the Federal Prison System brought educators with top-level training to its staff. Considering the existing rules, the aforementioned professionals formed partnerships with educational institutions so that the right for quality education was guaranteed within Federal Prisons. This article presents an experience report about the work of Educational Assistance developed at the federal prison of Porto Velho, Rondônia, Brazil, where some of the inmates are considered the most dangerous in the country. The aim is to focus on the insertion of Education within a

  9. Transportation operations functions of the federal waste management system

    International Nuclear Information System (INIS)

    Shappert, L.B.; Klimas, M.J.

    1989-01-01

    This paper documents the functions that are necessary to operate the OCRWM transportation system. OCRWM's mission is to accept and transport spent fuel and high-level waste from waste generators to FWMS facilities. The emphasis is on transportation operations and assumes that all necessary facilities are in place and equipment designs and specifications are available to permit the system to operate properly. The information reported in this paper was developed for TOPO and is compatible with the draft revision of the Waste Management System Requirements and Description (SRD). 5 refs

  10. Interdisciplinary Bachelor Degrees in Federal University of Bahia: a review of the Project implementation

    Directory of Open Access Journals (Sweden)

    Monica Lima

    2015-11-01

    Full Text Available We discuss conceptual framework, operational perspective and political-institutional features of the Interdisciplinary Bachelor Degree (BI implementation in the Federal University of Bahia, between 2009 and 2012, as compared to existing university education models which, until then, only offered disciplinary professional courses. We analyze narratives of key agents of the process, three UFBA teachers who performed administrative functions, and a BI student, engaged in the student movement. We have concluded that the perspective for the BI to become the first cycle at UFBA is on hold; support and resistance movements have accompanied it, suggesting large institutional challenges. However, the experience has led to a vigorous revision of rules and regulations naturalized for a long time and enabled reflections on the traditional concept of university education in Brazil.

  11. Guide to federal intelligent transportation system (ITS) research.

    Science.gov (United States)

    2013-01-01

    The U.S. Department of Transportations (USDOT) Intelligent Transportation System (ITS) Program aims to bring connectivity to transportation through the use of advanced wireless technologies powerful technologies that enable transformative chan...

  12. 77 FR 22637 - Federal Motor Vehicle Safety Standards; Accelerator Control Systems

    Science.gov (United States)

    2012-04-16

    ... revise the Federal Motor Vehicle Safety Standard for accelerator control systems (ACS) in two ways. First... Standard (FMVSS) No. 124, Accelerator Control Systems,\\2\\ in two ways. First, we are proposing to update... February 2011 final report ``Technical Assessment of Toyota Electronic Throttle Control Systems,'' the...

  13. 75 FR 51521 - Federal Motor Vehicle Safety Standards; Air Brake Systems; Technical Report on the Effectiveness...

    Science.gov (United States)

    2010-08-20

    ....121) mandates antilock braking systems (ABS) on all new air-braked vehicles with a GVWR of 10,000...-0116] Federal Motor Vehicle Safety Standards; Air Brake Systems; Technical Report on the Effectiveness of Antilock Braking Systems in Heavy Truck Tractors and Trailers AGENCY: National Highway Traffic...

  14. 14 CFR Special Federal Aviation... - Fuel Tank System Fault Tolerance Evaluation Requirements

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel Tank System Fault Tolerance Evaluation..., SFAR No. 88 Special Federal Aviation Regulation No. 88—Fuel Tank System Fault Tolerance Evaluation... certificates that may affect the airplane fuel tank system, for turbine-powered transport category airplanes...

  15. 75 FR 75549 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Science.gov (United States)

    2010-12-03

    ..., et al. Defense Federal Acquisition Regulation Supplement; Business Systems-- Definition and... Regulation Supplement; Business Systems--Definition and Administration (DFARS Case 2009-D038) AGENCY: Defense.... SUPPLEMENTARY INFORMATION: I. Background DoD published a proposed rule for Business Systems--Definition and...

  16. A Software Architecture for Control of Value Production in Federated Systems

    Directory of Open Access Journals (Sweden)

    Jay S. Bayne

    2003-08-01

    Full Text Available Federated enterprises are defined as interactive commercial entities that produce products and consume resources through a network of open, free-market transactions. Value production in such entities is defined as the real-time computation of enterprise value propositions. These computations are increasingly taking place in a grid-connected space – a space that must provide for secure, real-time, reliable end-to-end transactions governed by formal trading protocols. We present the concept of a value production unit (VPU as a key element of federated trading systems, and a software architecture for automation and control of federations of such VPUs.

  17. The Contradictions of the Modern Version of Russian Federalism: Instability of the System

    Directory of Open Access Journals (Sweden)

    Сергей Олегович Алехнович

    2011-03-01

    Full Text Available In the article there considered contradictions of the modern version of the Russian federalism, as a political and politological problem. The authors made an attempt to present the problem of federalism at conceptually-analytical level as a certain ritual meaning of the certain form of a state system thereby its values substance becomes an object of analysis. Besides applied function of federalism it's necessary to see the process of its perception and acceptance by national multinational consciousness through a prism of stability of political process, political practice, actions of the state institutes of power, persons and leaders of the center and regions.

  18. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  19. Financing Solar Energy Systems with Energy Savings Performance Contracts in the Federal Sector: Results of a Survey on Barriers

    Energy Technology Data Exchange (ETDEWEB)

    Gee, R. C.; LaPorta, C.

    1999-08-17

    This report summarizes the findings of an investigation into financing solar energy systems for the Federal sector. The objectives of the investigation were (1) to identify the barriers that impede companies from using Energy Savings Performance Contracts (ESPCs) to develop solar energy projects for Federal facilities, and (2) to clarify the impacts of Federal contracting requirements on energy service companies' use of ESPCs. Twenty-four representatives of energy service companies agreed to be interviewed. Their responses indicate that these are the primary barriers to greater use of ESPCs: the relatively long payback periods for investments in solar technologies; the length of the ESPC process; the cost of certain contractual requirements regarding wages and financing; and a lack of knowledge about the actual cost and reliability of solar systems. The report proposes a number of actions the government could take to remove these barriers, including (1) streamlining and shortening the ESPC process and (2) doing more to inform both government agencies and energy service companies about the costs and benefits of solar systems.

  20. Impact of a decommissioning project on the site area, the federal state, and their economic development

    International Nuclear Information System (INIS)

    Spies, B.G.; Butt, G.M.

    1996-01-01

    Greifswald-Lubmin is a site situated in a border region of Germany, but in the center of eastern Europe and the Baltic countries. The chances of the area are a high vocational qualification of the population and the economic potential opened up by the planned decommissioning of the Greifswald nuclear power plant. A decisive factor for the region's future is to interlace the decommissioning and dismantling activities on site with suitable action taken in support of improvement of the infrastructure and the economic life of the region, as a joint effort of local decision-taking bodies and authorities as well as the Land government. Commitment of private firms from Germany and abroad in the project management and performance of project tasks can contribute valuable stimulation and support. (orig.)

  1. The Gtz system management applied to photovoltaic rural electrification projects

    Energy Technology Data Exchange (ETDEWEB)

    Rosenthal, Pablo [Brendel Proper, (Bolivia)]|[GTZ-Cooperacion Tecnica de la Republica de Alemania, (Germany)

    1995-12-31

    The GTZ (Federal Republic of Germany Technical Cooperation Society) has developed a general project design system, particularly for Renewable Energy, that systematically covers all aspects necessary in their planning and implementation, so that their effects are sustainable in the long run, and cover as well all the requirements of a determined diffusion. This is what they have called System Management. This methodology of project implementation can be described as capable of being applied to any action area, and has already proved and validated its efficiency in projects where it has been applied. The main reason for its use is based on the correction of previous experiences with projects that had a tendency towards one area of action alone, in a much too exclusive way -mainly the technological- neglecting important aspects in the sustainability of technologies being introduced. The experience of PROPER - Bolivia (Programa para la difusion de energias renovables), who has been applying this system to its projects, is being used as a methodological basis. PROPER started in 1991, and is programed to last until September or 1996. Among the main components being described in the system`s methodology, in the particular case of PHOTOVOLTAIC RURAL ELECTRIFICATION PROJECTS, stand out the areas of Technological Transference; Training; Diffusion; Financing; Energy Policy; Planning, Monitoring, and Evaluation; and Support and Follow-up to the supply and demand. [Espanol] La GTZ (Sociedad de Cooperacion Tecnica de la Republica Federal de Alemania) ha desarrollado un proyecto de sistema de diseno general, particularmente para Energia Renovable, que cubre sistematicamente todos los aspectos necesarios en su planeacion y puesta en practica , de tal manera que sus efectos son a la larga sustentables y cubren, asimismo todos los requerimientos de una difusion determinada. Esto es lo que han llamado {sup A}dministracion del Sistema{sup .} Esta metodologia de puesta en practica

  2. The Gtz system management applied to photovoltaic rural electrification projects

    Energy Technology Data Exchange (ETDEWEB)

    Rosenthal, Pablo [Brendel Proper, (Bolivia); [GTZ-Cooperacion Tecnica de la Republica de Alemania, (Germany)

    1996-12-31

    The GTZ (Federal Republic of Germany Technical Cooperation Society) has developed a general project design system, particularly for Renewable Energy, that systematically covers all aspects necessary in their planning and implementation, so that their effects are sustainable in the long run, and cover as well all the requirements of a determined diffusion. This is what they have called System Management. This methodology of project implementation can be described as capable of being applied to any action area, and has already proved and validated its efficiency in projects where it has been applied. The main reason for its use is based on the correction of previous experiences with projects that had a tendency towards one area of action alone, in a much too exclusive way -mainly the technological- neglecting important aspects in the sustainability of technologies being introduced. The experience of PROPER - Bolivia (Programa para la difusion de energias renovables), who has been applying this system to its projects, is being used as a methodological basis. PROPER started in 1991, and is programed to last until September or 1996. Among the main components being described in the system`s methodology, in the particular case of PHOTOVOLTAIC RURAL ELECTRIFICATION PROJECTS, stand out the areas of Technological Transference; Training; Diffusion; Financing; Energy Policy; Planning, Monitoring, and Evaluation; and Support and Follow-up to the supply and demand. [Espanol] La GTZ (Sociedad de Cooperacion Tecnica de la Republica Federal de Alemania) ha desarrollado un proyecto de sistema de diseno general, particularmente para Energia Renovable, que cubre sistematicamente todos los aspectos necesarios en su planeacion y puesta en practica , de tal manera que sus efectos son a la larga sustentables y cubren, asimismo todos los requerimientos de una difusion determinada. Esto es lo que han llamado {sup A}dministracion del Sistema{sup .} Esta metodologia de puesta en practica

  3. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  4. The DIRAC Data Management System and the Gaudi dataset federation

    CERN Document Server

    Haen, Christophe; Frank, Markus; Tsaregorodtsev, Andrei

    2015-01-01

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks.In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. This paper also focuses on the DIRAC File Catalog, for which a lot of new developments have been carried out, so that LH...

  5. 75 FR 35096 - Federal Employees' Retirement System; Present Value Factors

    Science.gov (United States)

    2010-06-21

    ... by the Board of Actuaries of the Civil Service Retirement System. DATES: The revised present value.... ADDRESSES: Send requests for actuarial assumptions and data to the Board of Actuaries, care of Gregory Kissel, Actuary, Office of Planning and Policy Analysis, Office of Personnel Management, Room 4307, 1900...

  6. 76 FR 32243 - Federal Employees' Retirement System; Present Value Factors

    Science.gov (United States)

    2011-06-03

    ... adopted by the Board of Actuaries of the Civil Service Retirement System. DATES: The revised present value.... ADDRESSES: Send requests for actuarial assumptions and data to the Board of Actuaries, care of Gregory Kissel, Actuary, Office of Planning and Policy Analysis, Office of Personnel Management, Room 4307, 1900...

  7. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  8. The Expert Project Management System (EPMS)

    Science.gov (United States)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  9. Status and development programme of the fast breeder reactor system in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Daeunert, U.; Kessler, G.

    1977-01-01

    The Federal Republic of Germany depends on imports of raw materials for energy purposes, and special importance is therefore given to nuclear energy for reasons of energy policy. Against the background of a nuclear power station capacity amounting to 24,000MW(e) in 1976 (power stations being either on order, under construction or actually in operation), the fast breeder reactor (FBR) is outstandingly significant in the Federal Republic for the economic use both of the uranium and the plutonium accumulating in light-water reactors (LWRs). Work in this sector started in the FRG in 1960. Important stages in development were: the initial activities on the plutonium critical SNEAK at Karlsruhe; successful operation of the KNK 20-MW(e) experimental reactor (sodium-cooled) with the KNK II (plutonium core) follow-up stage; costruction of the 300-MW(e) FBR prototype nuclear power station at Kalkar; and initial planning carried out for a 1300-MW(e) FBR demonstration nuclear power station. A viable infrastructure for safety assessment must go hand in hand with the development of new reactor systems. Prototype reactors in the FRG are therefore already subjected to the same strict licensing procedures under nuclear legislation as are commercial nuclear power stations. Several years' practical experience have shown that this was the right approach. It was recognized in the FRG early on that major long-term technological projects could no longer be implemented by unaided single nations. The SNR-300 FBR prototype project combines the efforts of the governments, power supply companies, reactor manufacturers and nuclear research centres of the FRG, Belgium and the Netherlands. The agreement signed in 1971 by the Rheinisch-Westfaelische Elektrizitaetswerke AG (FRG), Ente Nazionale per l'Energia Elettrica (Italy) and Electricite de France (France) power supply companies on the joint construction of the Super-Phenix and SNR-2 FBR demonstration nuclear power stations, and the German

  10. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs: FY 2005 Budget Request

    Energy Technology Data Exchange (ETDEWEB)

    National Renewable Energy Laboratory

    2004-05-01

    The Office of Energy Efficiency and Renewable Energy (EERE) of the U.S. Department of Energy (DOE) leads the Federal Government's efforts to provide reliable, affordable, and environmentally sound energy for America, through its 11 research, development, demonstration, and deployment (RDD&D) programs. EERE invests in high-risk, high-value research and development (R&D) that, conducted in partnership with the private sector and other government agencies, accelerates the development and facilitates the deployment of advanced clean energy technologies and practices. This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2005 Budget Request. EERE has adopted a benefits framework developed by the National Research Council (NRC) to represent the various types of benefits resulting from the energy efficiency technology improvements and renewable energy technology development prompted by EERE programs. EERE's benefits analysis focuses on three main categories of energy-linked benefits-economic, environmental, and security. These metrics are not a complete representation of the benefits or market roles of efficiency and renewable technologies, but provide an indication of the range of benefits provided. EERE has taken steps to more fully represent the NRC framework, including two key improvements to the FY 2005 analysis-adding an electricity security metric and extending the analysis through the year 2050.

  11. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs: FY 2006 Budget Request

    Energy Technology Data Exchange (ETDEWEB)

    Norland, D.; Jenkin, T.

    2005-05-01

    The Office of Energy Efficiency and Renewable Energy (EERE) of the U.S. Department of Energy (DOE) leads the Federal Government's efforts to provide reliable, affordable, and environmentally sound energy for America, through its 11 research, development, demonstration, and deployment (RDD&D) programs. EERE invests in high-risk, high-value research and development (R&D) that, conducted in partnership with the private sector and other government agencies, accelerates the development and facilitates the deployment of advanced clean energy technologies and practices. EERE designs its RDD&D activities to improve the Nation's readiness for addressing current and future energy needs. This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2006 Budget Request. EERE has adopted a benefits framework developed by the National Research Council (NRC) to represent the various types of benefits resulting from the energy efficiency technology improvements and renewable energy technology development supported by EERE programs. Specifically, EERE's benefits analysis focuses on three main categories of energy-linked benefits--economic, environmental, and security.

  12. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  13. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.4.6

    Energy Technology Data Exchange (ETDEWEB)

    Arp, J.A.; Bower, J.C.; Burnett, R.A.; Carter, R.J.; Downing, T.R.; Fangman, P.M.; Gerhardstein, L.H.; Homer, B.J.; Johnson, D.M.; Johnson, R.L.; Johnson, S.M.; Loveall, R.M.; Martin, T.J.; Millard, W.D.; Schulze, S.A.; Stoops, L.R.; Tzemos, S.; Wood, B.M.

    1999-06-29

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are corrected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication data distribution and notification functionality necessary to operate FEMIS in a networked, client/server environment.

  14. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  15. 76 FR 53045 - Prevailing Rate Systems; Abolishment of Monmouth, NJ, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2011-08-25

    ... Monmouth, NJ, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel... Wage System (FWS) wage area and redefine Monmouth County, NJ, to the Burlington, NJ, NAF wage area. These changes are necessary because the closure of Fort Monmouth will leave the Monmouth wage area...

  16. 78 FR 60182 - Prevailing Rate Systems; Definition of Broward County, Florida, to a Nonappropriated Fund Federal...

    Science.gov (United States)

    2013-10-01

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM83 Prevailing Rate Systems; Definition of... wage area. The Federal Prevailing Rate Advisory Committee, the national labor-management committee... follows: PART 532--PREVAILING RATE SYSTEMS 0 1. The authority citation for part 532 continues to read as...

  17. 78 FR 29658 - Prevailing Rate Systems; Definition of Broward County, Florida, to a Nonappropriated Fund Federal...

    Science.gov (United States)

    2013-05-21

    ... OFFICE OF PERSONNEL MANAGEMENT 5 CFR Part 532 RIN 3206-AM83 Prevailing Rate Systems; Definition of... and Palm Beach Counties, FL. The Federal Prevailing Rate Advisory Committee, the national labor... 532--PREVAILING RATE SYSTEMS 0 1. The authority citation for part 532 continues to read as follows...

  18. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  19. 75 FR 3178 - Defense Federal Acquisition Regulation Supplement; Lead System Integrators

    Science.gov (United States)

    2010-01-20

    ... Government procurement. Amy G. Williams, Editor, Defense Acquisition Regulations System. 0 Accordingly, the..., without change, an interim rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to... limitations on the award of new contracts for lead system integrator functions in the acquisition of major DoD...

  20. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  1. Controlled Ecological Life Support System Breadboard Project - 1988

    Science.gov (United States)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  2. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  3. Genuine federalism in the Russian health care system: changing roles of government.

    Science.gov (United States)

    Chernichovsky, D; Potapchik, E

    1999-02-01

    The reforms that have affected the Russian health care system since the breakup of the Soviet Union, principally those in the general administration of the Russian Federation, have suffered from inconsistency and the absence of a strategy. The various reforms have caused a shift from a national health system characterized by highly centralized management and control, typical of the totalitarian uniform state, to a highly decentralized but fragmented multitude of state systems. Each of these systems is relatively centralized at the local level and run by local administrations with limited government infrastructure and experience. The role of government in the emerging system, and in particular the role of the federal government, remains ill defined. As a result, there is a grave risk that the Russian health care system may disintegrate as a national system. This undermines (a) the prevailing universal and fairly equitable access to care, (b) stabilization of the system following a long period of transition, and (c) the long-term reform that is required to bring the Russian health care system up to par with the health care systems in other developed countries. A rapid transition to a genuine federal health system with well-articulated roles for different levels of government, in tandem with implementation of the 1993 Compulsory Health Insurance System, is essential for the stabilization and reform of the Russian health care system.

  4. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  5. Culvert information management system : demonstration project, final report, August 2009.

    Science.gov (United States)

    2009-08-01

    The overall objective of the research was to develop a pilot scale Culvert Information Management System (CIMS) that will : comply with both requirements stipulated by the Governmental Accounting Standards Board (GASB-34) and new federal : storm wate...

  6. Oilfield Flare Gas Electricity Systems (OFFGASES Project)

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Henderson; Robert Fickes

    2007-12-31

    The Oilfield Flare Gas Electricity Systems (OFFGASES) project was developed in response to a cooperative agreement offering by the U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) under Preferred Upstream Management Projects (PUMP III). Project partners included the Interstate Oil and Gas Compact Commission (IOGCC) as lead agency working with the California Energy Commission (CEC) and the California Oil Producers Electric Cooperative (COPE). The project was designed to demonstrate that the entire range of oilfield 'stranded gases' (gas production that can not be delivered to a commercial market because it is poor quality, or the quantity is too small to be economically sold, or there are no pipeline facilities to transport it to market) can be cost-effectively harnessed to make electricity. The utilization of existing, proven distribution generation (DG) technologies to generate electricity was field-tested successfully at four marginal well sites, selected to cover a variety of potential scenarios: high Btu, medium Btu, ultra-low Btu gas, as well as a 'harsh', or high contaminant, gas. Two of the four sites for the OFFGASES project were idle wells that were shut in because of a lack of viable solutions for the stranded noncommercial gas that they produced. Converting stranded gas to useable electrical energy eliminates a waste stream that has potential negative environmental impacts to the oil production operation. The electricity produced will offset that which normally would be purchased from an electric utility, potentially lowering operating costs and extending the economic life of the oil wells. Of the piloted sites, the most promising technologies to handle the range were microturbines that have very low emissions. One recently developed product, the Flex-Microturbine, has the potential to handle the entire range of oilfield gases. It is deployed at an oilfield near Santa Barbara to run on waste gas

  7. Federal Energy Resources Modernization Coordinating Committee

    Energy Technology Data Exchange (ETDEWEB)

    Parker, G. B.

    1992-07-01

    This report summarizes the broad range of activities supported by Federal Energy Management Program (FEMP) and other federal agencies focused on meeting the President's Executive Order on Federal Energy Management promulgated to meet energy savings goals and encourage more efficient management of all federal energy resources. These activities are reported semiannually under the auspices of the FERM Coordinating Committee, and as such include activities undertaken from October 1, 1991, through March 31, 1992. The activities reported are classified into four major categories: (1) technology-base support, which includes development of processes, software, metering and monitoring equipment and strategies, and other tools for the federal energy manager to better understand and characterize their energy resources; (2) federal energy systems testing and monitoring; (3) federal energy systems modernization projects at federal installations in cooperation with the utilities serving the sites; and (4) energy supply, distribution and end-use conservation assessment for federal agencies and/or facilities.

  8. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  9. New Project System for Undergraduate Electronic Engineering

    Science.gov (United States)

    Chiu, Dirk M.; Chiu, Shen Y.

    2005-01-01

    A new approach to projects for undergraduate electronic engineering in an Australian university has been applied successfully for over 10 years. This approach has a number of projects running over three year period. Feedback from past graduates and their managers has confirmed that these projects train the students well, giving them the ability…

  10. Federal Emergency Management Information System (FEMIS) system administration guide, version 1.4.5

    Energy Technology Data Exchange (ETDEWEB)

    Arp, J.A.; Burnett, R.A.; Carter, R.J. [and others

    1998-06-26

    The Federal Emergency Management Information Systems (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication, data distribution, and notification functionality necessary to operate FEMIS in a networked, client/server environment. The UNIX server provides an Oracle relational database management system (RDBMS) services, ARC/INFO GIS (optional) capabilities, and basic file management services. PNNL developed utilities that reside on the server include the Notification Service, the Command Service that executes the evacuation model, and AutoRecovery. To operate FEMIS, the Application Software must have access to a site specific FEMIS emergency management database. Data that pertains to an individual EOC`s jurisdiction is stored on the EOC`s local server. Information that needs to be accessible to all EOCs is automatically distributed by the FEMIS

  11. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Technology of the Federal Republic of Germany. Reporting period 2007. Progress report

    International Nuclear Information System (INIS)

    2007-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Research Management Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system 'Joint Safety Research Index (JSRI)'. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  12. Exploration Medical System Demonstration (EMSD) Project

    Science.gov (United States)

    Chin, Duane

    2012-01-01

    The Exploration Medical System Demonstration (EMSD) is a project under the Exploration Medical Capability (ExMC) element managed by the Human Research Program (HRP). The vision for the EMSD is to utilize ISS as a test bed to show that several medical technologies needed for an exploration mission and medical informatics tools for managing evidence and decision making can be integrated into a single system and used by the on-orbit crew in an efficient and meaningful manner. Objectives: a) Reduce and even possibly eliminate the time required for on-orbit crew and ground personnel (which include Surgeon, Biomedical Engineer (BME) Flight Controller, and Medical Operations Data Specialist) to access and move medical data from one application to another. b) Demonstrate that the on-orbit crew has the ability to access medical data/information using an intuitive and crew-friendly software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management framework and architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities.

  13. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  14. Characterization of federated oil fractions used for the PTAC project to study the petroleum fraction-specific toxicity to soils

    International Nuclear Information System (INIS)

    Wang, Z.; Jokuty, P.; Fingas, M.; Sigouin, L.

    2001-01-01

    In 1998, the Petroleum Technology Alliance of Canada (PTAC) and the Canadian Association of Petroleum Producers (CAPP) launched an important research project for the oil and gas industry entitled A Fraction-Specific Toxicity and Derivation of Recommended Soil Quality Guidelines for Crude Oil in Agricultural Soils. The objective was to generate useful and relevant data that could be used to develop soil quality guidelines for petroleum hydrocarbon residuals in agricultural soils. The oil used in the study was Federated crude oil which was fractionated into four fractions using a distillation method. The fraction-based approach was used to support ecologically-relevant, risk-based, soil quality criteria for the protection of environmental health. This paper presented the nominal carbon number and boiling point ranges of these fractions and described the distillation procedures for producing the fractions from the Federated crude oil. The paper also presented the detailed chemical characterization results of each distillation fraction. The toxicity of the crude oil mixture to plants and soil invertebrates was also assessed using standardized toxicity tests. Tests were also conducted to assess the toxicity of fractions of the crude oil and the toxic interactions of the fractions responsible for a significant proportion of the toxicity. Phase 2 of the project was designed to determine if hydrocarbon residuals exceeding 1000 μg/g and weathered for short or long periods of time, posed an ecotoxicological risk or impaired soil physical, chemical and biological properties such that productivity of the agricultural soils was compromised. The objectives of phase 2 were to amend differently textured soils in field plots at sites with fresh crude oil and to monitor their toxicity to terrestrial organisms using laboratory-based ecotoxicity tests. The study showed that because of the nature of the chemical composition of hydrocarbons (such as boiling points, nominal carbon range

  15. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  16. Annual report on reactor safety research projects sponsored by the Minister for Research and Technology of the Federal Republic of Germany 1989

    International Nuclear Information System (INIS)

    1990-08-01

    Investigations on the safety of light water reactors (LWR) being performed in the framework of his research program on reactor safety are sponsored by the Bundesminister fuer Forschung und Technologie (BMFT) (Federal Minister for Research and Technology). Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks also projects on the safety of advanced reactors are sponsored by the BMFT. The Gesellschaft fuer Reaktorsicherheit (GRS), (Society for Reactor Safety), by order of the BMFT, informs continuously of the status of such investigations by means of semi-annual and annual publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the Forschungsbetreuung at the GRS, (FB) (Research Coordination Department), within the framework of general informations of progress in reactor safety research. The individual reports are classified according to the same classification system as applied in the nuclear index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in sequence of their project numbers. (orig./HP)

  17. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  18. Staffing requirements for future small and medium reactors based on projections in the Russian Federation

    International Nuclear Information System (INIS)

    Antonovsky, G.M.; Kodochigov, N.G.; Kurachenkov, A.V.; Novikov, V.V.

    2001-01-01

    Experimental Design Bureau of Mechanical Engineering (OKBM) specializes in the development of small and medium power reactors having different purposes. They include reactor plants for NPHPP, nuclear district heating power plants and propulsion plants. Small and medium power plants have simpler processes of electricity and heat production, less systems, simpler control algorithms and considerably enhanced inherent safety properties. These plants are mainly equipped with passive safety systems. These properties are especially characteristic for reactor plants of nuclear district heating power plants and HTG reactor plants. The designs of small and medium power plants actually provide a high degree of control automation which considerably reduces workload on the personnel in both normal and abnormal operation conditions. All this allows the reduction in personnel for small and medium power reactors if compared to high capacity reactor plants. But due to objective reasons the specific number of personnel (man/MW) for average and especially small capacity reactors considerably exceeds the value for high capacity reactor plants. At the same time one can propose a set of organization - technical measures allowing the increase in this value in future. Safety requirements imposed for small and average capacity reactors are the same or more strict than those for high capacity reactors. That's why the requirements to the training of personnel for such reactor plants are not allowed to be lowered if compared to the requirements imposed to the personnel of high capacity reactors. (author)

  19. Management of natural crises with choreography and orchestration of federated warning-systems

    Science.gov (United States)

    Haener, Rainer; Waechter, Joachim; Hammitzsch, Martin

    2013-04-01

    The project Collaborative, Complex and Critical Decision-Support in Evolving Crises (TRIDEC), co-funded by the European Commission in its Seventh Framework Programme focuses on real-time intelligent information management in earth management. The addressed challenges include the design and implementation of a robust and scalable service infrastructure supporting the integration of existing resources, components and systems. Key challenge for TRIDEC is establishing a network of independent systems, cooperatively interacting as a collective in a system-of-systems (SoS). For this purpose TRIDEC adopts enhancements of service-oriented architecture (SOA) principles in terms of an event-driven architecture (EDA) design (SOA 2.0). In this way TRIDEC establishes large-scale concurrent and intelligent information management of a manifold of crisis types by focusing on the integration of autonomous, task-oriented and geographically distributed systems. To this end TRIDEC adapts both ways SOA 2.0 offers: orchestration and choreography. In orchestration, a central knowledge-based processing framework takes control over the involved services and coordinates their execution. Choreography on the other hand avoids central coordination. Rather, each system involved in the SoS follows a global scenario without a single point of control but specifically defined (enacted, agreed upon) trigger conditions. More than orchestration choreography allows collaborative business processes of various heterogeneous sub-systems (e.g. cooperative decision making) by concurrent Complex Event Processing (CEP) and asynchronous communication. These types of interaction adapt the concept of decoupled relationships between information producers (e.g. sensors and sensor systems) and information consumers (e.g. warning systems and warning dissemination systems). Asynchronous communication is useful if a participant wants to trigger specific actions by delegating the responsibility (separation of concerns

  20. Can Courts Make Federalism Work? A Game Theory Approach to Court-Induced Compliance and Defection in Federal Systems

    Directory of Open Access Journals (Sweden)

    Gemma Sala

    2014-12-01

    Full Text Available Few studies on federalism analyze the role of courts as safeguards of the federal arrangement, and those that do tend to be too optimistic about what courts can do. This article analyzes the effect of judicial review on the interaction between the central and a regional government in a federation in order to understand the conditions under which courts may or may not enforce compliance with federalism. It argues that politicians of either level of government anticipate the likelihood of a judicial challenge and an eventual veto, and it finds distinct equilibria in the interaction between central and regional governments (imposition, auto-limitation, negotiation and litigation. Only under auto-limitation do courts effectively prevent transgressions to the federal arrangement. In all other scenarios, defection may take place despite the presence of courts. These findings show that as the court’s jurisprudence becomes more solid and defined, the chances for governments to successfully exceed their powers increase. Not only do transgressions take place despite the presence of the court, but because of it.

  1. Understanding Interdependencies between Heterogeneous Earth Observation Systems When Applied to Federal Objectives

    Science.gov (United States)

    Gallo, J.; Sylak-Glassman, E.

    2017-12-01

    We will present a method for assessing interdependencies between heterogeneous Earth observation (EO) systems when applied to key Federal objectives. Using data from the National Earth Observation Assessment (EOA), we present a case study that examines the frequency that measurements from each of the Landsat 8 sensors are used in conjunction with heterogeneous measurements from other Earth observation sensors to develop data and information products. This EOA data allows us to map the most frequent interactions between Landsat measurements and measurements from other sensors, identify high-impact data and information products where these interdependencies occur, and identify where these combined measurements contribute most to meeting a key Federal objective within one of the 13 Societal Benefit Areas used in the EOA study. Using a value-tree framework to trace the application of data from EO systems to weighted key Federal objectives within the EOA study, we are able to estimate relative contribution of individual EO systems to meeting those objectives, as well as the interdependencies between measurements from all EO systems within the EOA study. The analysis relies on a modified Delphi method to elicit relative levels of reliance on individual measurements from EO systems, including combinations of measurements, from subject matter experts. This results in the identification of a representative portfolio of all EO systems used to meet key Federal objectives. Understanding the interdependencies among a heterogeneous set of measurements that modify the impact of any one individual measurement on meeting a key Federal objective, especially if the measurements originate from multiple agencies or state/local/tribal, international, academic, and commercial sources, can impact agency decision-making regarding mission requirements and inform understanding of user needs.

  2. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  3. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  4. Cattle grazing and fish recovery on US federal lands: can social-ecological systems science help?

    Science.gov (United States)

    Susan Charnley; Hannah Gosnell; Kendra L Wendel; Mary M Rowland; Michael J Wisdom

    2018-01-01

    In the western US, grazing management on federal lands containing habitat for fish species listed under the US Endangered Species Act (ESA) has sparked social conflict and litigation for decades. To date, the problem has been addressed through a top-down environmental governance system, but rangeland managers and grazing permittees now believe there is a need for more...

  5. 75 FR 71560 - Defense Federal Acquisition Regulation Supplement; Cost and Software Data Reporting System (DFARS...

    Science.gov (United States)

    2010-11-24

    ... also asked what allowance is provided for contractors with accounting software that does not... RIN 0750-AG46 Defense Federal Acquisition Regulation Supplement; Cost and Software Data Reporting... Regulation Supplement (DFARS) to address DoD Cost and Software Data Reporting system requirements for Major...

  6. 28 CFR 16.96 - Exemption of Federal Bureau of Investigation Systems-limited access.

    Science.gov (United States)

    2010-07-01

    ... individual. In addition, much of the information contained in or checked by this system is from Federal... from a third party. Should the subsection be so interpreted, exemption from this provision is necessary... that information they share is relevant, timely, complete and accurate. In fact, rules for use of the N...

  7. Criminal and Legal Tax System Protection of the Russian Federation and the Ukraine

    Directory of Open Access Journals (Sweden)

    Stepanenko D. Yu.

    2013-10-01

    Full Text Available The comparative law analysis of criminal law protection of the tax system of the Russian Federation and the Ukraine is presented in the article; some recommendations for improvement of the Russian and Ukrainian criminal legislations have been formulated on this basis as well

  8. 6th Annual Earth System Grid Federation Face to Face Conference Report

    Energy Technology Data Exchange (ETDEWEB)

    Williams, D. N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-03-06

    The Sixth Annual Face-to-Face (F2F) Conference of the Earth System Grid Federation (ESGF), a global consortium of international government agencies, institutions, and companies dedicated to the creation, management, analysis, and distribution of extreme-scale scientific data, was held December 5–9, 2016, in Washington, D.C.

  9. 75 FR 65439 - Defense Federal Acquisition Regulation Supplement; Electronic Subcontracting Reporting System

    Science.gov (United States)

    2010-10-25

    ... Accounting Service or Missile Defense Agency. (2) For DoD, the authority to acknowledge receipt or reject... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 219 and 252 [DFARS Case 2009-D002] Defense Federal Acquisition Regulation Supplement; Electronic Subcontracting Reporting...

  10. 77 FR 28471 - Prevailing Rate Systems; Abolishment of Montgomery, PA, as a Nonappropriated Fund Federal Wage...

    Science.gov (United States)

    2012-05-15

    ... minimum of 26 NAF wage employees in the survey area, the local activity has the capability to host annual... County from the wage area definition. There are no longer NAF FWS employees working in Bucks County... Montgomery, PA, as a Nonappropriated Fund Federal Wage System Wage Area AGENCY: U.S. Office of Personnel...

  11. Federal Emergency Management Information System (FEMIS) Data Management Guide for FEMIS Version 1.5

    Energy Technology Data Exchange (ETDEWEB)

    Bower, John C.(BATTELLE (PACIFIC NW LAB)); Burnett, Robert A.(BATTELLE (PACIFIC NW LAB)); Carter, Richard J.(BATTELLE (PACIFIC NW LAB)); Holter, Nancy A.(BATTELLE (PACIFIC NW LAB)); Hoza, Mark (BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M.(BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L.(BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M.(BATTELLE (PACIFIC NW LAB)); Loveall, Robert M.(BATTELLE (PACIFIC NW LAB)); Schulze, Stacy A.(BATTELLE (PACIFIC NW LAB)); Stephan, Alex J.(BATTELLE (PACIFIC NW LAB)); Wood, Blanche M.(BATTELLE (PACIFIC NW LAB))

    2001-12-01

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS Data Management Guide provides the information needed to manage the data used to support the administrative, user-environment, database management, and operational capabilities of FEMIS.

  12. System design projects for undergraduate design education

    Science.gov (United States)

    Batill, S. M.; Pinkelman, J.

    1993-01-01

    Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

  13. Solving Conic Systems via Projection and Rescaling

    OpenAIRE

    Pena, Javier; Soheili, Negar

    2015-01-01

    We propose a simple projection and rescaling algorithm to solve the feasibility problem \\[ \\text{ find } x \\in L \\cap \\Omega, \\] where $L$ and $\\Omega$ are respectively a linear subspace and the interior of a symmetric cone in a finite-dimensional vector space $V$. This projection and rescaling algorithm is inspired by previous work on rescaled versions of the perceptron algorithm and by Chubanov's projection-based method for linear feasibility problems. As in these predecessors, each main it...

  14. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  15. Projective measurements in quantum and classical optical systems

    CSIR Research Space (South Africa)

    Roux, FS

    2014-09-01

    Full Text Available equally well to both classical and quantum optical systems. A projective measurement, in the context of quantum mechanics, is understood to be the process where a projection operator operates on some input state. Often this projection operator is composed...) Projective measurements in quantum and classical optical systems Filippus S. Roux* and Yingwen Zhang CSIR National Laser Centre, P.O. Box 395, Pretoria 0001, South Africa (Received 3 July 2014; published 22 September 2014) Experimental setups for the optical...

  16. Controlled ecological life support system breadboard project, 1988

    Science.gov (United States)

    Knott, W. M.

    1990-01-01

    The Closed Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989 to 1993 are listed. The Biomass Production Chamber (BPC) became operational and tests of wheat as a single crop are nearing completion.

  17. Federal Emergency Management Information Systems (FEMIS), System Administration Guide FEMIS: Phase 1, Version 1.1u

    Energy Technology Data Exchange (ETDEWEB)

    Cerna, P.A.; Conner, W.M.; Curtis, L.M. [and others

    1995-06-01

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package.

  18. A federated information management system for the Deep Space Network. M.S. Thesis - Univ. of Southern California

    Science.gov (United States)

    Dobinson, E.

    1982-01-01

    General requirements for an information management system for the deep space network (DSN) are examined. A concise review of available database management system technology is presented. It is recommended that a federation of logically decentralized databases be implemented for the Network Information Management System of the DSN. Overall characteristics of the federation are specified, as well as reasons for adopting this approach.

  19. Status and programme of development of the fast breeder reactor systems in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Daeunert, U.; Kessler, G.

    1977-01-01

    Owing to the dependence of the Federal Republic of Germany on imports of raw materials for energy purposes, special importance is given to nuclear energy for reasons of energy policy. Against the background of a nuclear power station capacity amounting to 24,000 MWe in 1976 (power stations being either on order, under construction or actually in operation), the Fast Breeder Reactor (FBR) has quite outstanding significance in this country where the economical utilization both of uranium and of the plutonium accumulating in light water reactors is concerned. Work in this sector started in the Federal Republic of Germany in 1960. Milestones on the path of development were the initial activities on the plutonium critical SNEAK at Karlsruhe, the successful operation of the KNK 20 MWe experimental reactor (sodium-cooling) with the KNK II (plutonium core) follow-up stage, the construction of the 300 MWe FBR prototype nuclear power station at Kalkar, as well as the initial planning work carried out in connection with a 1,300 MWe FBR demonstration nuclear power station. The provision of a viable infrastructure for safety assessment must go hand in hand with the development of new reactor systems. For this reason, prototype reactors in the Federal Republic of Germany are already subjected to the same strict licensing procedures under nuclear legislation as are commercial nuclear power stations. After several years' practical experience, it is becoming evident that this approach was the right one to take. Already early on, it was recognized in the Federal Republic of Germany that the execution of long-term technological major projects were increasingly exceeding the capacities of unaided development by single nations. The SNR 300 FBR prototype project combines the efforts of the governments, power supply companies, reactor manufacturers and nuclear research centres of the Federal Republic of Germany and of the Kingdoms of both Belgium and the Netherlands. The Agreement signed

  20. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  1. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  2. Laser display system for multi-depth screen projection scenarios.

    Science.gov (United States)

    La Torre, J Pablo; Mayes, Nathan; Riza, Nabeel A

    2017-11-10

    Proposed is a laser projection display system that uses an electronically controlled variable focus lens (ECVFL) to achieve sharp and in-focus image projection over multi-distance three-dimensional (3D) conformal screens. The system also functions as an embedded distance sensor that enables 3D mapping of the multi-level screen platform before the desired laser scanned beam focused/defocused projected spot sizes are matched to the different localized screen distances on the 3D screen. Compared to conventional laser scanning and spatial light modulator (SLM) based projection systems, the proposed design offers in-focus non-distorted projection over a multi-distance screen zone with varying depths. An experimental projection system for a screen depth variation of 65 cm is demonstrated using a 633 nm laser beam, 3 KHz scan speed galvo-scanning mirrors, and a liquid-based ECVFL. As a basic demonstration, an in-house developed MATLAB based graphic user interface is deployed to work along with the laser projection display, enabling user inputs like text strings or predefined image projection. The user can specify projection screen distance, scanned laser linewidth, projected text font size, projected image dimensions, and laser scanning rate. Projected images are shown highlighting the 3D control capabilities of the display, including the production of a non-distorted image onto two-depths versus a distorted image via dominant prior-art projection methods.

  3. 3rd Annual Earth System Grid Federation and 3rd Annual Earth System Grid Federation and Ultrascale Visualization Climate Data Analysis Tools Face-to-Face Meeting Report December 2013

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Dean N. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-02-21

    The climate and weather data science community gathered December 3–5, 2013, at Lawrence Livermore National Laboratory, in Livermore, California, for the third annual Earth System Grid Federation (ESGF) and Ultra-scale Visualization Climate Data Analysis Tools (UV-CDAT) Face-to-Face (F2F) Meeting, which was hosted by the Department of Energy, National Aeronautics and Space Administration, National Oceanic and Atmospheric Administration, the European Infrastructure for the European Network of Earth System Modelling, and the Australian Department of Education. Both ESGF and UV-CDAT are global collaborations designed to develop a new generation of open-source software infrastructure that provides distributed access and analysis to observed and simulated data from the climate and weather communities. The tools and infrastructure developed under these international multi-agency collaborations are critical to understanding extreme weather conditions and long-term climate change, while the F2F meetings help to build a stronger climate and weather data science community and stronger federated software infrastructure. The 2013 F2F meeting determined requirements for existing and impending national and international community projects; enhancements needed for data distribution, analysis, and visualization infrastructure; and standards and resources needed for better collaborations.

  4. Virtual fringe projection system with nonparallel illumination based on iteration

    International Nuclear Information System (INIS)

    Zhou, Duo; Wang, Zhangying; Gao, Nan; Zhang, Zonghua; Jiang, Xiangqian

    2017-01-01

    Fringe projection profilometry has been widely applied in many fields. To set up an ideal measuring system, a virtual fringe projection technique has been studied to assist in the design of hardware configurations. However, existing virtual fringe projection systems use parallel illumination and have a fixed optical framework. This paper presents a virtual fringe projection system with nonparallel illumination. Using an iterative method to calculate intersection points between rays and reference planes or object surfaces, the proposed system can simulate projected fringe patterns and captured images. A new explicit calibration method has been presented to validate the precision of the system. Simulated results indicate that the proposed iterative method outperforms previous systems. Our virtual system can be applied to error analysis, algorithm optimization, and help operators to find ideal system parameter settings for actual measurements. (paper)

  5. Adaptive projective synchronization of different chaotic systems with nonlinearity inputs

    International Nuclear Information System (INIS)

    Niu Yu-Jun; Pei Bing-Nan; Wang Xing-Yuan

    2012-01-01

    We investigate the projective synchronization of different chaotic systems with nonlinearity inputs. Based on the adaptive technique, sliding mode control method and pole assignment technique, a novel adaptive projective synchronization scheme is proposed to ensure the drive system and the response system with nonlinearity inputs can be rapidly synchronized up to the given scaling factor. (general)

  6. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  7. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  8. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  9. Dominique-Janine extension, McClean Lake project, and midwest joint venture: report of the joint Federal-Provincial panel on uranium mining developments in Northern Saskatchewan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    A report of the joint federal-provincial panel on uranium mining developments in northern Saskatchewan. The review of the projects have taken into consideration the impact upon the peoples living in northern Saskatchewan. Benefits will be seen in the form of employment, business opportunities and royalties while causing only a small incremental increase to existing environmental and health risks.

  10. Dominique-Janine extension, McClean Lake project, and midwest joint venture: report of the joint Federal-Provincial panel on uranium mining developments in Northern Saskatchewan

    International Nuclear Information System (INIS)

    1993-10-01

    A report of the joint federal-provincial panel on uranium mining developments in northern Saskatchewan. The review of the projects have taken into consideration the impact upon the peoples living in northern Saskatchewan. Benefits will be seen in the form of employment, business opportunities and royalties while causing only a small incremental increase to existing environmental and health risks

  11. Advanced Ground Systems Maintenance Enterprise Architecture Project

    Science.gov (United States)

    Perotti, Jose M. (Compiler)

    2015-01-01

    The project implements an architecture for delivery of integrated health management capabilities for the 21st Century launch complex. The delivered capabilities include anomaly detection, fault isolation, prognostics and physics based diagnostics.

  12. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    Energy Technology Data Exchange (ETDEWEB)

    SPENCER, S.G.

    1999-04-26

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates.

  13. Tank waste remediation system year 2000 dedicated file server project HNF-3418 project plan

    International Nuclear Information System (INIS)

    SPENCER, S.G.

    1999-01-01

    The Server Project is to ensure that all TWRS supporting hardware (fileservers and workstations) will not cause a system failure because of the BIOS or Operating Systems cannot process Year 2000 dates

  14. The Workplace Literacy System Project (WLS). Final Performance Report.

    Science.gov (United States)

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  15. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  16. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  17. SE Capstone Project: Building Systems Engineering Education and Workforce Capacity

    Science.gov (United States)

    2012-04-01

    This project developed a system to improve fuel efficiency by means of regenerative braking . The team designed a simple system that allows "bolt-on...air traffic control, social networking, credit/debit cards, and anti-lock brakes are only a few functions enabled by complex systems of systems . We...Building Systems Engineering Education and Workforce Capacity SE Capstone Project APRIL 2012 Report Documentation Page Form ApprovedOMB No. 0704

  18. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  19. 5 CFR 837.802 - Benefits under another retirement system for Federal employees based on the most recent separation.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Benefits under another retirement system for Federal employees based on the most recent separation. 837.802 Section 837.802 Administrative... system for Federal employees based on the most recent separation. (a) Generally. An annuitant who has...

  20. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  1. Federal policies to promote the widespread utilization of photovoltaic systems. Supplement: review and critique

    Energy Technology Data Exchange (ETDEWEB)

    Smith, J.L.

    1980-04-15

    This document is intended as a supplement to the two-volume report entitled Federal Policies to Promote the Widespread Utilization of Photovoltaic Systems that was submitted to Congress by the Department of Energy in February and April of 1980. This supplement contains review comments prepared by knowledgeable experts who reviewed early drafts of the Congressional report. Responses to the review comments by the Jet Propulsion Laboratory, preparer of the Congressional report, are also included in this supplement. The Congressional report, mandated in the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (P.L. 95-590), discusses various issues related to promoting the deployment of photovoltaic systems through the Federal Photovoltaic Program. Various program strategies and funding levels are examined.

  2. Minatom of Russia Situation and Crisis Center and the Automated Federal Information System for Nuclear Material Control and Accounting

    International Nuclear Information System (INIS)

    Berchik, V.P.; Kasumova, L.A.; Babcock, R.A.; Heinberg, C.L.; Tynan, D.M.

    2001-01-01

    Under the Situation and Crisis Center (SCC) management, the Information Analytical Center (IAC) of the Ministry of Atomic Energy (Minatom) of Russia was created to oversee the operation of the Federal Nuclear Material Control and Accounting Information System (FIS). During 2000, the FIS achieved an important milestone in its development: the basic functions of the information system were implemented. This includes placing into operation the collecting and processing of nuclear material control and accounting (MC and A) information from the enterprises reporting to the FIS. The FIS began working with 14 Russian enterprises to develop and implement full-function reporting (i.e., reporting inventory and inventory changes including closeout and reconciliation between the FIS and enterprises). In 2001, the system will expand to include enterprise-level inventory information for all enterprises using nuclear materials in Russia. For this reason, at the end of 2000 through the beginning of 2001, five separate training sessions were held for over 100 enterprise personnel responsible for preparation and transfer of the reports to the FIS. Through the assistance of the Nuclear Material Protection, Control and Accounting (MPC and A) program, information systems for the accounting of nuclear materials are being installed at Russia enterprises. In creating the program for modernization of the Russian Federation State System of Accounting and Control (SSAC) of nuclear material, the SCC conducted a survey of the enterprises to determine the readiness of their internal MC and A systems for reporting to the FIS. Based on the information from the survey and the results of the projects on creation of local information systems at Russian enterprises, the analysis of information and the technical aspects of MC and A systems identified deficiencies that were analyzed and recommendations for eliminating these deficiencies were proposed. The concentration of analytical and administrative

  3. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    Science.gov (United States)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address

  4. Distinctive identity claims in federal systems: Judicial policing of subnational variance

    DEFF Research Database (Denmark)

    Abat Ninet, Antoni; Gardner, James A.

    2016-01-01

    nationally imposed limits on their power typically have at their disposal many tools with which to press against formal boundaries. Federal systems, moreover, frequently display a surprising degree of tolerance for subnational obstruction, disobedience, and other behaviors intended to expand subnational...... authority and influence, even over national objection. This tolerance, however, has limits. In this article, we examine a set of rulings by national constitutional courts invalidating formalized claims by subnational units to a distinctive subnational identity. The emphatically negative reactions...

  5. Project BASIC: Building Art Systems into Curriculum.

    Science.gov (United States)

    Benson, Cal; Doane, Mitzi

    1982-01-01

    Describes Duluth, Minnesota's interdisciplinary program, Project BASIC, which incorporates five major art forms into the elementary curriculum. Schools employ artists-in-residence and in-service training to expand teacher use of arts in the classroom. Results of a research study to measure gains in self-concept and creativity are included. (AM)

  6. Generalized projective synchronization of a unified chaotic system

    International Nuclear Information System (INIS)

    Yan Jianping; Li Changpin

    2005-01-01

    In the present paper, a simple but efficient control technique of the generalized projective synchronization is applied to a unified chaotic system. Numerical simulations show that this method works very well, which can also be applied to other chaotic systems

  7. Sources of project financing in health care systems.

    Science.gov (United States)

    Smith, D G; Wheeler, J R; Rivenson, H L; Reiter, K L

    2000-01-01

    Through discussions with chief financial officers of leading health care systems, insights are offered on preferences for project financing and development efforts. Data from these same systems provide at least anecdotal evidence in support of pecking-order theory.

  8. A secure communication system using projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems

    International Nuclear Information System (INIS)

    Thang Manh Hoang; Nakagawa, Masahiro

    2008-01-01

    In this paper, a chaotic secure communication system is proposed by using the schemes of projective-lag and/or projective-anticipating synchronizations of coupled multidelay feedback systems and the modulation technique of synchronization-manifold shift keying. Further, the security of the proposed system is enhanced by using non-stationary dynamics in the master and/or non-stationary synchronization manifolds. The specific examples using modified Ikeda systems demonstrate and verify the effectiveness of the proposed system

  9. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  10. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  11. QFD Application to a Software - Intensive System Development Project

    Science.gov (United States)

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  12. Advanced EVA Suit Camera System Development Project

    Science.gov (United States)

    Mock, Kyla

    2016-01-01

    The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was

  13. System Design and Engineering, lubricating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    This text book introduces systems engineering for designing systems in multidisciplinary projects. First an overview of the systems engineering process is given. Several systems thinking tracks are presented, to think about the system in a number of ways, its context, its user, its functionality,

  14. DOE's nation-wide system for access control can solve problems for the federal government

    International Nuclear Information System (INIS)

    Callahan, S.; Tomes, D.; Davis, G.; Johnson, D.; Strait, S.

    1996-07-01

    The U.S. Department of Energy's (DOE's) ongoing efforts to improve its physical and personnel security systems while reducing its costs, provide a model for federal government visitor processing. Through the careful use of standardized badges, computer databases, and networks of automated access control systems, the DOE is increasing the security associated with travel throughout the DOE complex, and at the same time, eliminating paperwork, special badging, and visitor delays. The DOE is also improving badge accountability, personnel identification assurance, and access authorization timeliness and accuracy. Like the federal government, the DOE has dozens of geographically dispersed locations run by many different contractors operating a wide range of security systems. The DOE has overcome these obstacles by providing data format standards, a complex-wide virtual network for security, the adoption of a standard high security system, and an open-systems-compatible link for any automated access control system. If the location's level of security requires it, positive visitor identification is accomplished by personal identification number (PIN) and/or by biometrics. At sites with automated access control systems, this positive identification is integrated into the portals

  15. High frequency system project implementation plan

    International Nuclear Information System (INIS)

    Moon, L.L.

    1976-01-01

    The High Frequency System is a new mobile, digital diagnostic recording system for use at the Nevada Test Site. Many different kinds of event data will be digitized in real-time by this system, and these data will be recorded and stored for later read-out and transmission to NADCEN. The hardware and software requirements of the High Frequency System are examined, and the parameters of the system are proposed

  16. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  17. Compliance status summaries for federal and state statutory directives that apply to the Salt Repository Project at the Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    This document contains statutory summaries, checklists of compliance requirements, status summaries, and lists of information needs for the environmental and health and safety statutory directives at Federal and State levels that apply to the Salt Repository Project at the Deaf Smith County Site, Texas. Statutes that apply in general to any repository project but not specifically to the Deaf Smith are not included. The information herein supplements the Salt Repository Project Statutory Compliance Plan and the Salt Repository Project Permitting Management Plan by providing lengthy details on statutory directives, compliance requirements, information needs, and the overall status of the environmental and health and safety compliance program for the Salt Repository Project at the Deaf Smith County Site, Texas

  18. Optimized application of systems engineering to nuclear waste repository projects

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Shepard, M.

    1986-01-01

    The purpose of this presentation is to describe a fully optimized application of systems engineering methods and philosophy to the management of a large nuclear waste repository project. Knowledge gained from actual experience with the use of the systems approach on two repository projects is incorporated in the material presented. The projects are currently evaluating the isolation performance of different geologic settings and are in different phases of maturity. Systems engineering methods were applied by the principal author at the Waste Isolation Pilot Plant (WIPP) in the form of a functional analysis. At the Basalt Waste Isolation Project (BWIP), the authors assisted the intergrating contractor with the development and application of systems engineering methods. Based on this experience and that acquired from other waste management projects, an optimized plan for applying systems engineering techniques was developed. The plan encompasses the following aspects: project organization, developing and defining requirements, assigning work responsibilities, evaluating system performance, quality assurance, controlling changes, enhancing licensability, optimizing project performance, and addressing regulatory issues. This information is presented in the form of a roadmap for the practical application of system engineering principles to a nuclear waste repository project

  19. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  20. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  1. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    Science.gov (United States)

    Lawrence N. Hudson; Joseph Wunderle M.; And Others

    2016-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to...

  2. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    NARCIS (Netherlands)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of

  3. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    DEFF Research Database (Denmark)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity ...

  4. Projective synchronization of chaotic systems with bidirectional ...

    Indian Academy of Sciences (India)

    2Department of Applied Mathematics, University of Calcutta, 92, A.P.C. Road,. Kolkata 700 009, India. ∗ ... versal phenomenon in a variety of natural and engineering systems [4]. Over the past two decades ..... Now, following the rule for the construction of master–slave system, we obtain the master system as. ˙x1 = x2 + ...

  5. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  6. Integrating a dynamic data federation into the ATLAS distributed data management system

    CERN Document Server

    Berghaus, Frank; The ATLAS collaboration

    2018-01-01

    Input data for applications that run in cloud computing centres can be stored at remote repositories, typically with multiple copies of the most popular data stored at many sites. Locating and retrieving the remote data can be challenging, and we believe that federating the storage can address this problem. In this approach, the closest copy of the data is used based on geographical or other information. Currently, we are using the dynamic data federation, Dynafed, a software solution developed by CERN IT. Dynafed supports several industry standards for connection protocols, such as Amazon S3, Microsoft Azure and HTTP with WebDAV extensions. Dynafed functions as an abstraction layer under which protocol-dependent authentication details are hidden from the user, requiring the user to only provide an X509 certificate. We have set up an instance of Dynafed and integrated it into the ATLAS distributed data management system, Rucio. We report on the challenges faced during the installation and integration.

  7. THE IMPACT OF SYSTEM OF BUDGET EQUILIBRATION ON MACROECONOMIC INDEXES OF RUSSIAN FEDERATION

    Directory of Open Access Journals (Sweden)

    E.V. Peshina

    2007-12-01

    Full Text Available Theoretical regulations of basic conceptions of budget equilibration are considered in the article and the position of budget deficit/proficit in a system of socioeconomics relations is grounded. Estimation of control mechanism of budget deficit and proficit in the system of socioeconomics relations was conducted. This estimation confirmed an analysis inference about large discontinuity and fragmentation, that is outboard, first of all in respect of strategy of financial policy, sum-total of using, at present, principles, methods and regulations of budgetary management. The article contains a description of basic directions of budgetary policy about optimization of budget deficit/proficit in Russian Federation.

  8. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  9. Controlled cooling of an electronic system based on projected conditions

    Science.gov (United States)

    David, Milnes P.; Iyengar, Madhusudan K.; Schmidt, Roger R.

    2015-08-18

    Energy efficient control of a cooling system cooling an electronic system is provided based, in part, on projected conditions. The control includes automatically determining an adjusted control setting(s) for an adjustable cooling component(s) of the cooling system. The automatically determining is based, at least in part, on projected power consumed by the electronic system at a future time and projected temperature at the future time of a heat sink to which heat extracted is rejected. The automatically determining operates to reduce power consumption of the cooling system and/or the electronic system while ensuring that at least one targeted temperature associated with the cooling system or the electronic system is within a desired range. The automatically determining may be based, at least in part, on an experimentally obtained model(s) relating the targeted temperature and power consumption of the adjustable cooling component(s) of the cooling system.

  10. Examining fiscal federalism, regionalization and community-based initiatives in Canada's health care delivery system.

    Science.gov (United States)

    Forest, Pierre-Gerlier; Palley, Howard A

    2008-01-01

    This study focuses on the ability of Canadian provinces to shape in different ways the development of various provincial health delivery systems within the constraints of the mandates of the federal Canada Health Act of 1984 and the fiscal revenues that the provinces receive if they comply with these mandates. In so doing, it will examine the operation of Canadian federalism with respect to various provincial health systems. This study applies a comparative analysis framework developed by Heisler and Peters to facilitate an understanding of the dimensionality of provincial health delivery systems as applied to the case of provincial regionalization and community-based initiatives. The three sets of relationships touched upon are: first, the levels of government and the nature of their involvement in public policy concerning the provincial health care delivery systems; and secondly, understanding of the factors influencing provincial governments' political dispositions to act in various directions. A third dimension that is taken are the factors influencing the "timing" of particular decisions. A fourth area noted by Heisler and Peters and other comparative analysts is the nature and characteristics of public and private sector activities in health care and other social policy areas. While the evolving nature of public and private sector health care delivery activities within Canada's provincial and territorial systems is a significant policy matter in the Canadian context, due to the space limitations of this article, they are not discussed herein.

  11. 75 FR 71648 - Federal Motor Vehicle Safety Standards, Child Restraint Systems; Hybrid III 10-Year-Old Child...

    Science.gov (United States)

    2010-11-24

    ... No. NHTSA-2010-0158 Regulation Identifier No. (RIN) 2127-AJ44 Federal Motor Vehicle Safety Standards, Child Restraint Systems; Hybrid III 10-Year-Old Child Test Dummy AGENCY: National Highway Traffic Safety... (SNPRM). SUMMARY: This document proposes to amend Federal Motor Vehicle Safety Standard (FMVSS) No. 213...

  12. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  13. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  14. Controlling general projective synchronization of fractional order Rossler systems

    International Nuclear Information System (INIS)

    Shao Shiquan

    2009-01-01

    This paper proposed a method to achieve general projective synchronization of two fractional order Rossler systems. First, we construct the fractional order Rossler system's corresponding approximation integer order system. Then, a control method based on a partially linear decomposition and negative feedback of state errors was utilized on the integer order system. Numerical simulations show the effectiveness of the proposed method.

  15. Annual report on Reactor Safety Research Projects sponsored by the Ministry of Economics and Technology of the Federal Republic of Germany. Reporting period 1999. Progress report

    International Nuclear Information System (INIS)

    2000-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technologie (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to the classification system ''Joint Safety Research Index'' of the CEC (commission of the European communities). The reports are arranged in sequence of their project numbers. (orig.)

  16. Airspace Systems Program: Next Generation Air Transportation System Concepts and Technology Development FY2010 Project Plan Version 3.0

    Science.gov (United States)

    Kopardekar, Parimal H.

    2010-01-01

    This document describes the FY2010 plan for the management and execution of the Next Generation Air Transportation System (NextGen) Concepts and Technology Development (CTD) Project. The document was developed in response to guidance from the Airspace Systems Program (ASP), as approved by the Associate Administrator of the Aeronautics Research Mission Directorate (ARMD), and from guidelines in the Airspace Systems Program Plan. Congress established the multi-agency Joint Planning and Development Office (JPDO) in 2003 to develop a vision for the 2025 Next Generation Air Transportation System (NextGen) and to define the research required to enable it. NASA is one of seven agency partners contributing to the effort. Accordingly, NASA's ARMD realigned the Airspace Systems Program in 2007 to "directly address the fundamental research needs of the Next Generation Air Transportation System...in partnership with the member agencies of the JPDO." The Program subsequently established two new projects to meet this objective: the NextGen-Airspace Project and the NextGen-Airportal Project. Together, the projects will also focus NASA s technical expertise and world-class facilities to address the question of where, when, how and the extent to which automation can be applied to moving aircraft safely and efficiently through the NAS and technologies that address optimal allocation of ground and air technologies necessary for NextGen. Additionally, the roles and responsibilities of humans and automation influence in the NAS will be addressed by both projects. Foundational concept and technology research and development begun under the NextGen-Airspace and NextGen-Airportal projects will continue. There will be no change in NASA Research Announcement (NRA) strategy, nor will there be any change to NASA interfaces with the JPDO, Federal Aviation Administration (FAA), Research Transition Teams (RTTs), or other stakeholders

  17. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  18. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  19. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  20. Federal Government response to the September 12, 2000 environmental assessment report of the EUB-CEAA Joint Review Panel on the Cheviot Coal Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-04-01

    The Federal Court noted four deficiencies in the joint EUB-CEAA environmental review dated September 12, 2000 for the Cheviot Coal Project. The Joint Review Panel reconvened to hear additional evidence about these deficiencies. This memorandum to cabinet comprises the Government of Canada's response to the additional evidence. Some of the Panel's recommendations are accepted. Comments are included regarding migratory birds, protection of traditional aboriginal sites, economic benefits, grizzly bears, and fish habitat.

  1. The integrated melter off-gas treatment systems at the West Valley Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Vance, R.F. [West Valley Nuclear Services Co., Inc., NY (United States)

    1995-02-01

    The West Valley Demonstration Project was established by Public Law 96-368, the {open_quotes}West Valley Demonstration Project Act, {close_quotes} on October 1, l980. Under this act, Congress directed the Department of Energy to carry out a high level radioactive waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The purpose of this project is to demonstrate solidification techniques which can be used for preparing high level radioactive waste for disposal. In addition to developing this technology, the West Valley Demonstration Project Act directs the Department of Energy to: (1) develop containers suitable for permanent disposal of the high level waste; (2) transport the solidified high level waste to a Federal repository; (3) dispose of low level and transuranic waste produced under the project; and (4) decontaminate and decommission the facilities and materials associated with project activities and the storage tanks originally used to store the liquid high level radioactive waste. The process of vitrification will be used to solidify the high level radioactive liquid wastes into borosilicate glass. This report describes the functions, the controlling design criteria, and the resulting design of the melter off-gas treatment systems which are used in the vitrification process.

  2. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  3. Federal Emergency Management Information system (FEMIS) data management guide. Version 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Johnson, S.M.; Loveall, R.M.; Winters, C.

    1996-05-01

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of FEMIS. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, how it is loaded, and how it is managed while the system is in operation.

  4. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  5. Data Management System of the DIRAC Project

    CERN Multimedia

    Haen, Christophe; Tsaregorodtsev, Andrei

    2015-01-01

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks. In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. The DIRAC DMS is in use by several user communities now. The contribution will present the experience of the LHCb exper...

  6. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  7. SGDes project. Decommissioning management system of Enresa

    International Nuclear Information System (INIS)

    Fernandez Lopez, M.; Julian, A. de

    2013-01-01

    ENRESA, the public company responsible for managing radioactive waste produced in spain and nuclear facilities decommissioning work, has developed a management information system (SGDes) for the decommissioning of nuclear power plants, critical for the company. SGDes system is capable of responding to operational needs for efficient, controlled and secure way. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both the human and technological point of view. (Author)

  8. Evaluating and projecting the European security system

    International Nuclear Information System (INIS)

    Dean, J.

    1991-01-01

    Components of the new European security system are described taking into account the new policy making and possibilities to resolve conflicts. Programmes for political and economic integration and co-operation managed by the European Community will provide main positive content of the new European security system. An insight of the future of nuclear armaments in Europe is included together with confidence building measure and the role of NATO

  9. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  10. Full state hybrid projective synchronization in hyperchaotic systems

    International Nuclear Information System (INIS)

    Chu Yandong; Chang Yingxiang; Zhang Jiangang; Li Xianfeng; An Xinlei

    2009-01-01

    In this letter, we investigate the full state hybrid projective synchronization (FSHPS) which includes complete synchronization, anti-synchronization and projective synchronization as its special items. Based on Lyapunov stability theory a controller can be designed for achieving the FSHPS of hyperchaotic systems. Numerical simulations are provided to verify the effectiveness of the proposed scheme.

  11. Boundary Spanning in Offshored Information Systems Development Projects

    Science.gov (United States)

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  12. The Food Early Warning System Project in Somalia

    Directory of Open Access Journals (Sweden)

    Leblanc, M.

    1992-01-01

    Full Text Available The article describes shortly the objectives of a Food Early Warning System (FEWS project, as well as its organisation. The specifie case of Somalia, where the project had to evolve in increasingly difficult situations, and the solutions used so as to preserve the output, are described.

  13. A Role for Soft Systems Methodology in ELT Projects.

    Science.gov (United States)

    Holliday, Adrian

    1990-01-01

    Discusses the uses for soft systems methodology (SSM) in English language training (ELT) projects. It is suggested that ethnographic techniques may help in achieving the understanding needed to start an ELT project while SSM may provide a useful means for structuring ethnographic findings. (Author/VWL)

  14. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  15. Control system of the MACSE project

    International Nuclear Information System (INIS)

    Gournay, J.F.; Gougnaud, F.; Matichard, G.; Azoulay, R.; Bouillac, A.

    1991-01-01

    With the goal of investigating all the technological aspects of superconducting RF acceleration, the so-called MACSE facility was put in operation at the end of 1990. The control system is built with several VME crates linked together with a dedicated Ethernet network. VxWorks is the real-time operating system used. A set of software services was built on top of VxWorks (high level communication tools, a data-base management system, a library of VME boards drivers and a limited man-machine interface). A complete range of application programs have been developed with these tools in order to fulfill the requirements of such a facility (settings of the parameters, surveillance, archive facility, closed loops...). The TCP-IP protocols family is extensively used for communications between the components of the system (UDP, RPC, rcmd, NFS). The development environment is based on the host-target approach through the use of a network of Sun 3/80 workstations. After 1 1/2 year of experience, this system has proven to be powerful and flexible [fr

  16. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  17. Towards Scalability for Federated Identity Systems for Cloud-Based Environments

    Directory of Open Access Journals (Sweden)

    André Albino Pereira

    2015-12-01

    Full Text Available As multi-tenant authorization and federated identity management systems for cloud computing matures, the provisioning of services using this paradigm allows maximum efficiency on business that requires access control. However, regarding scalability support, mainly horizontal, some characteristics of those approaches based on central authentication protocols are problematic. The objective of this work is to address these issues by providing an adapted sticky-session mechanism for a Shibboleth architecture using JASIG CAS. This alternative, compared with the recommended distributed memory approach, shown improved efficiency and less overall infrastructure complexity, as well as demanding less 58% of computational resources and improving throughput (requests per second by 11%.

  18. Monetary Policy of the Federal Reserve System from the Perspective of Exit Strategies

    Directory of Open Access Journals (Sweden)

    Aleksandra Nocoń

    2015-07-01

    Full Text Available Central banks, after the experience of the global financial crisis, are now starting the implementation of the exit strategies, which are the process of normalization of monetary policy. The pace of monetary policy normalization process depends on the market reaction to central bank's decisions and macroeconomic conditions, in which they will be implemented. The main aim of the study is to present the principles of the exit strategy of the Federal Reserve System (Fed, on the background of the changes that have occurred in the United States within the monetary policy during the global financial crisis.

  19. The regulatory control of radiation sources in Australia -- The challenges of a federal system

    International Nuclear Information System (INIS)

    Loy, J.; Colgan, P.

    2001-01-01

    The report refers to the challenges that Australia is facing, as a federal nation having a Commonwealth Government and six States and two territories, in establishing appropriate regulatory control of radiation sources. Information on the national inventory of radiation sources and existing regulatory infrastructure, including the system of notification, registration, licensing, inspection and enforcement, is explained in the report. The national provisions for the management of disused sources; the planning, preparedness and response to abnormal events and emergencies; the recovery of control over orphan sources; and education and training; are specifically emphasized. (author)

  20. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  1. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    1999-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  2. The Fox Project: Advanced Development of Systems Software

    National Research Council Canada - National Science Library

    2000-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  3. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  4. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  5. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  6. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  7. 23 CFR 810.302 - Eligible projects.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  8. Reports on radiation protection R and D projects of the Federal Ministry of the Interior in the year 1983

    International Nuclear Information System (INIS)

    1984-10-01

    The volume presents separate reports set up by the contractors or donees for documentation of the progress achieved within the framework of the various projects. The reports inform about the project purpose, work performed, results obtained, and further activities and goals. The full-text reports are preceeded by four different lists showing the report titles arranged according to terms of the radiation protection thesaurus, to project packages, to project numbers, and to an alphabetical subject index. (orig./HP) [de

  9. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  10. Function Projective Synchronization of Two Identical New Hyperchaotic Systems

    International Nuclear Information System (INIS)

    Li Xin; Chen Yong

    2007-01-01

    A function projective synchronization of two identical hyperchaotic systems is defined and the theorem of sufficient condition is given. Based on the active control method and symbolic computation Maple, the scheme of function projective synchronization is developed to synchronize the two identical new hyperchaotic systems constructed by Yan up to a scaling function matrix with different initial values. Numerical simulations are used to verify the effectiveness of the scheme.

  11. Modeling the design and operations of the federal radioactive waste management system

    International Nuclear Information System (INIS)

    Joy, D.S.; Nehls, J.W. Jr.; Harrison, I.G.; Miller, C.; Vogel, L.W.; Martin, J.D.; Capone, R.L.; Dougherty, L.

    1989-04-01

    Many configuration, transportation and operating alternatives are available to the Office of Civilian Radioactive Waste Management (OCRWM) in the design and operation of the Federal Radioactive Waste Management System (FWMS). Each alternative has different potential impacts on system throughput, efficiency and the thermal and radiological characteristics of the waste to be shipped, stored and emplaced. A need therefore exists for a quantitative means of assessing the ramifications of alternative system designs and operating strategies. We developed the Systems integration Operations/Logistics Model (SOLMOD). That model is used to replicate a user-specified system configuration and simulate the operation of that system -- from waste pickup at reactors to emplacement in a repository -- under a variety of operating strategies. The model can thus be used to assess system performance with or without Monitored Retrievable Storage (MRS), with or without consolidation at the repository, with varying shipping cask availability and so forth. This simulation capability is also intended to provide a tool for examining the impact of facility and equipment capacity and redundancy on overall waste processing capacity and system performance. SOLMOD can measure the impacts on system performance of certain operating contingencies. It can be used to test effects on transportation and waste pickup schedules resulting from a shut-down of one or more hot cells in the waste handling building at the repository or MRS. Simulation can also be used to study operating procedures and rules such as fuel pickup schedules, general freight vs. dedicated freight. 3 refs., 2 figs., 2 tabs

  12. Systems design and engineering : facilitating multidisciplinary development projects

    NARCIS (Netherlands)

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  13. Tank waste remediation system characterization project quality policies

    International Nuclear Information System (INIS)

    Board, D.C.

    1997-01-01

    This quality plan describes the system used by Characterization Project management to achieve quality. This plan is comprised of eleven quality policies which, when taken together, form a management system deployed to achieve quality. This quality management system is based on the customer's quality requirements known as the 'RULE', 10 CFR 830.120, Quality Assurance

  14. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  15. Major Components of the National TRU Waste System Optimization Project

    International Nuclear Information System (INIS)

    Moody, D.C.; Bennington, B.; Sharif, F.

    2002-01-01

    The National Transuranic (TRU) Program (NTP) is being optimized to allow for disposing of the legacy TRU waste at least 10 years earlier than originally planned. This acceleration will save the nation an estimated $713. The Department of Energy's (DOE'S) Carlsbad Field Office (CBFO) has initiated the National TRU Waste System Optimization Project to propose, and upon approvaI, implement activities that produce significant cost saving by improving efficiency, thereby accelerating the rate of TRU waste disposal without compromising safety. In its role as NTP agent of change, the National TRU Waste System Optimization Project (the Project) (1) interacts closely with all NTP activities. Three of the major components of the Project are the Central Characterization Project (CCP), the Central Confirmation Facility (CCF), and the MobiIe/Modular Deployment Program.

  16. Extending the GANIL control system for the SPIRAL project

    International Nuclear Information System (INIS)

    Lecorche, E.

    1997-01-01

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author)

  17. Extending the GANIL control system for the SPIRAL project

    Energy Technology Data Exchange (ETDEWEB)

    Lecorche, E

    1997-12-31

    The SPIRAL project under construction at GANIL aims to deliver radioactive ion beams to the physicists by the end of 1998. In 1996, it has been proposed to achieve most of the SPIRAL control system as an extension of the system currently in use at GANIL. Therefore the main features of the GANIL control system design are first recalled. Then the paper shows how the GANIL control system should have been upgraded and extended to integrate the SPIRAL project. This evolution had to cope with the specific needs brought by the new machine and to consider the size of the project which is around one third of the GANIL control system volume. Lastly current status of the system is given. (author) 5 refs.

  18. Space Object and Light Attribute Rendering (SOLAR) Projection System

    Science.gov (United States)

    2017-05-08

    depicting the proposed SOLAR projection system. The installation process is shown in Fig. 3. SOLAR system comprises of a dome that houses Digitairum’s...imaging process. A fiberglass dome system was erected to make the SOLAR system a self contained facility. Calibration process was carried out to register...Separate software solutions were implemented to model the light transport processes involved in the imaging process. A fiberglass dome system was erected to

  19. Comparison measurements of the official individual dosimetry systems in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Boehm, J.

    1988-01-01

    At present, about 220,000 radiation workers are subject to individual monitoring of external radiation in the Federal Republic of Germany in accordance with the X-Ray Ordinance and the Radiation Protection Ordinance and the Radiation Protection Ordinance. Each radiation worker must wear at least one individual dosemeter provided by one of the five officially authorized dosemeter services. Requirements for these dosemeter services with respect to technical equipment and personnel are published in the form of a national directive. The five dosemeter services must participate in the comparison measurements for photon radiation with the official dosemeters issued by them. The comparison measurements are organized at least once a year by the Physicalisch-Technische Bundesanstalt (PTB) in agreement with the Federal Minister of Economics. Film dosemeters evaluated with a filter analysis procedure are most frequently used (96.% of all evaluations in 1984) to monitor the whole body exposure to photon radiation. Glass dosemeters play a minor role (0.5%). They are issued by only two officially authorized dosemeter services and are approved for measurements of photons with energies above 45 keV. According to the national directive, thermoluminescence dosemeters may be used only for partial body dosimetry of photon and beta radiation (2.8%). Nuclear track emulsion films are distributed to measure neutrons of energies above 0.5 MeV. A thermoluminescence albedo dosemeter for the measurement of less energetic neutrons is being introduced. The dosimetry systems involved in the comparison measurements and the operational radiation protection monitoring system of the Federal Republic of Germany are described elsewhere. The objective of this work is to describe the performance of the comparison measurements and to give some results obtained from 1979 to 1984

  20. Technology Investments in the NASA Entry Systems Modeling Project

    Science.gov (United States)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  1. Teaching about American Federal Democracy.

    Science.gov (United States)

    Schechter, Stephen L., Ed.

    Ten essays discuss federal democracy, the form of government of the United States. The first essay discusses the origins of American federalism. The second examines why we have a federal system, the functions federalism serves, and the consequences of federalism for the American political system. Federalism in the Constitution and constitutional…

  2. Research on calibration algorithm in laser scanning projection system

    Science.gov (United States)

    Li, Li Juan; Qu, Song; Hou, Mao Sheng

    2017-10-01

    Laser scanning projection technology can project the image defined by the existing CAD digital model to the working surface, in the form of a laser harness profile. This projection is in accordance with the ratio of 1: 1. Through the laser harness contours with high positioning quality, the technical staff can carry out the operation with high precision. In a typical process of the projection, in order to determine the relative positional relationship between the laser projection instrument and the target, it is necessary to place several fixed reference points on the projection target and perform the calibration of projection. This position relationship is the transformation from projection coordinate system to the global coordinate system. The entire projection work is divided into two steps: the first step, the calculation of the projector six position parameters is performed, that is, the projector calibration. In the second step, the deflection angle is calculated by the known projector position parameter and the known coordinate points, and then the actual model is projected. Typically, the calibration requires the establishment of six reference points to reduce the possibility of divergence of the nonlinear equations, but the whole solution is very complex and the solution may still diverge. In this paper, the distance is detected combined with the calculation so that the position parameters of the projector can be solved by using the coordinate values of three reference points and the distance of at least one reference point to the projector. The addition of the distance measurement increases the stability of the solution of the nonlinear system and avoids the problem of divergence of the solution caused by the reference point which is directly under the projector. Through the actual analysis and calculation, the Taylor expansion method combined with the least squares method is used to obtain the solution of the system. Finally, the simulation experiment is

  3. White Pine Co. Public School System Biomass Conversion Heating Project

    Energy Technology Data Exchange (ETDEWEB)

    Paul Johnson

    2005-11-01

    The White Pine County School District and the Nevada Division of Forestry agreed to develop a pilot project for Nevada using wood chips to heat the David E. Norman Elementary School in Ely, Nevada. Consideration of the project was triggered by a ''Fuels for Schools'' grant that was brought to the attention of the School District. The biomass project that was part of a district-wide energy retrofit, called for the installation of a biomass heating system for the school, while the current fuel oil system remained as back-up. Woody biomass from forest fuel reduction programs will be the main source of fuel. The heating system as planned and completed consists of a biomass steam boiler, storage facility, and an area for unloading and handling equipment necessary to deliver and load fuel. This was the first project of it's kind in Nevada. The purpose of the DOE funded project was to accomplish the following goals: (1) Fuel Efficiency: Purchase and install a fuel efficient biomass heating system. (2) Demonstration Project: Demonstrate the project and gather data to assist with further research and development of biomass technology; and (3) Education: Educate the White Pine community and others about biomass and other non-fossil fuels.

  4. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  5. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.

  6. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level if known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV

  7. Federal Environmental Requirements for Construction

    Data.gov (United States)

    Department of Veterans Affairs — This guide provides information on federal environmental requirements for construction projects. It is written primarily for owners of construction projects and for...

  8. Lighting technology specifications for relighting federal buildings

    International Nuclear Information System (INIS)

    Harris, L.; Purcell, C.W.; Gordon, H.; McKay, H.

    1993-01-01

    The Department of Energy's Federal Relighting Initiative, under the Federal Energy Management Program (FEMP), now offers a comprehensive process to assist agencies in meeting the DOE energy mandate that states that Federal facilities shall use 20% less energy by the year 2000, based on 1985 consumption, and shall improve lighting to increase productivity with relighting projects. The process provides a systematic approach in the screening, selection, design, implementation and evaluation of relighting projects. The Master Specifications help assure the acquisition of high-quality, life-cycle cost-effective lighting systems. The process begins with the screening of the agency's building stock to identify the most promising relighting candidates and concludes with implementation support and system performance assessment. The tools developed by FRI are designed to assist agencies during each phase of the relighting process. The tools are based upon the Federal life-cycle cost approach, thereby complying with 10 CFR, part 436, and the Federal life-cycle cost requirement

  9. Generalized projective synchronization of chaotic systems via adaptive learning control

    International Nuclear Information System (INIS)

    Yun-Ping, Sun; Jun-Min, Li; Hui-Lin, Wang; Jiang-An, Wang

    2010-01-01

    In this paper, a learning control approach is applied to the generalized projective synchronisation (GPS) of different chaotic systems with unknown periodically time-varying parameters. Using the Lyapunov–Krasovskii functional stability theory, a differential-difference mixed parametric learning law and an adaptive learning control law are constructed to make the states of two different chaotic systems asymptotically synchronised. The scheme is successfully applied to the generalized projective synchronisation between the Lorenz system and Chen system. Moreover, numerical simulations results are used to verify the effectiveness of the proposed scheme. (general)

  10. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, L. N.; Newbold, T.; Contu, S.; Hill, S. L.; Lysenko, I.; De Palma, A.; Phillips, H. R.; Alhusseini, T. I.; Bedford, F. E.; Bennett, D. J.; Booth, H.; Burton, V. J.; Chng, C. W.; Choimes, A.; Correia, D. L.

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  11. Understanding large social-ecological systems: introducing the SESMAD project

    Directory of Open Access Journals (Sweden)

    Michael Cox

    2014-08-01

    Full Text Available This article introduces the Social-ecological systems meta-analysis database (SESMAD project, which is the project behind the case studies and synthetic articles contained in this special issue of the International Journal of the Commons. SESMAD is an internationally collaborative meta-analysis project that builds on previous seminally synthetic work on small-scale common-pool resource systems conducted at the Workshop in Political Theory and Policy Analysis at Indiana University. This project is guided by the following research question: can the variables found to be important in explaining outcomes on small-scale systems be scaled up to explain outcomes in large-scale environmental governance? In this special issue we report on our findings thus far through a set of case studies of large-scale environmental governance, a paper that describes our conceptual advances, and a paper that compares these five case studies to further examine our central research question.

  12. The Acquisition Process as a Vehicle for Enabling Knowledge Management in the Lifecycle of Complex Federal Systems

    Science.gov (United States)

    Stewart, Helen; Spence, Matt Chew; Holm, Jeanne; Koga, Dennis (Technical Monitor)

    2001-01-01

    This white paper explores how to increase the success and operation of critical, complex, national systems by effectively capturing knowledge management requirements within the federal acquisition process. Although we focus on aerospace flight systems, the principles outlined within may have a general applicability to other critical federal systems as well. Fundamental design deficiencies in federal, mission-critical systems have contributed to recent, highly visible system failures, such as the V-22 Osprey and the Delta rocket family. These failures indicate that the current mechanisms for knowledge management and risk management are inadequate to meet the challenges imposed by the rising complexity of critical systems. Failures of aerospace system operations and vehicles may have been prevented or lessened through utilization of better knowledge management and information management techniques.

  13. An overview of waste management systems at the West Valley demonstration project

    International Nuclear Information System (INIS)

    McIntosh, T.W.; Bixby, W.W.; Krauss, J.E.; Leap, D.R.

    1988-01-01

    In 1980, the United States Congress passed into law the West Valley Demonstration Project Act authorizing the Department of Energy (DOE) to conduct a nuclear waste management project at a former commercial nuclear fuel reprocessing facility located in West Valley, New York. The Project's main objective is to solidify approximately two million litres of high-level radioactive liquid waste into a form suitable for transport to a federal repository for final disposal. The majority of the liquid waste was produced as a by-product of the PUREX extraction process and is stored in an underground steel tank. A waste characterization program has shown that the neutralized waste has settled into two distinct layers: a clear alkaline liquid (supernatant) layer and a dense precipitate (sludge) layer. The principle radioactive elements in the waste are cesium 137 (supernatant) and strontium 90 (sludge). This paper describes the overall project strategy, the waste management systems, the present project engineering and construction status and the project schedule leading to radioactive operation

  14. System biology and the project Encode

    Directory of Open Access Journals (Sweden)

    M. Yu. Obolenskaya

    2014-08-01

    Full Text Available The goal of this review is to give an incipient knowledge on the background of system biology, the premises to its assignment as a new branch of biology, its principles, methodology and its great achievements in identification of functional elements of human genome and regulation of their concordant­ and differential activity. The short characteristics of functional elements including the protein-coding sequences and those coding noncoding RNAs, the DNAse 1 hypersensitivity sites and methylated CpG islets, modified histones and specific 3D structure of chromatin, are represented. The topology of transcription factors network with its main motifs, hierar­chy, combination and association of transcription factors and their allelic specificity are highlighted­.

  15. The BIRN Project: Imaging the Nervous System

    International Nuclear Information System (INIS)

    Ellisman, Mark

    2006-01-01

    The grand goal in neuroscience research is to understand how the interplay of structural, chemical and electrical signals in nervous tissue gives rise to behavior. Experimental advances of the past decades have given the individual neuroscientist an increasingly powerful arsenal for obtaining data, from the level of molecules to nervous systems. Scientists have begun the arduous and challenging process of adapting and assembling neuroscience data at all scales of resolution and across disciplines into computerized databases and other easily accessed sources. These databases will complement the vast structural and sequence databases created to catalogue, organize and analyze gene sequences and protein products. The general premise of the neuroscience goal is simple; namely that with 'complete' knowledge of the genome and protein structures accruing rapidly we next need to assemble an infrastructure that will facilitate acquisition of an understanding for how functional complexes operate in their cell and tissue contexts.

  16. TMI defueling project fuel debris removal system

    International Nuclear Information System (INIS)

    Burdge, B.

    1992-01-01

    The three mile Island Unit 2 (TMI-2) pressurized water reactor loss-of-coolant accident on March 28, 1979, presented the nuclear community with many challenging remediation problems; most importantly, the removal of the fission products within the reactor containment vessel. To meet this removal problem, an air-lift system (ALS) can be used to employ compressed air to produce the motive force for transporting debris. Debris is separated from the transport stream by gravity separation. The entire method does not rely on any moving parts. Full-scale testing of the ALS at the Idaho National Engineering Laboratory (INEL) has demonstrated the capability of transporting fuel debris from beneath the LCSA into a standard fuel debris bucket at a minimum rate of 230 kg/min

  17. REPP: A Case Study in Federal Financing--Long Term Fiscal and Instructional Implications. A Project Report.

    Science.gov (United States)

    Kistler, Kathleen M.

    A study was conducted at the College of the Redwoods to analyze the fiscal, institutional, and instructional impact of the Redwood Employees Protection Plan (REPP) program, a federally funded retraining program for timber workers displaced by redwood park expansion. The study involved telephone interviews with 37 former and current students, 16…

  18. The Creation of Differential Correction Systems and the Systems of Global Navigation Satellite System Monitoring

    National Research Council Canada - National Science Library

    Polishchuk, G. M; Kozlov, V. I; Urlichich, Y. M; Dvorkin, V. V; Gvozdev, V. V

    2002-01-01

    ... for the Russian Federation and a system of global navigation satellite system monitoring. These projects are some of the basic ones in the Federal program "Global Navigation System," aimed at maintenance and development of the GLONASS system...

  19. Federal Aviation Administration (FAA airworthiness certification for ceramic matrix composite components in civil aircraft systems

    Directory of Open Access Journals (Sweden)

    Gonczy Stephen T.

    2015-01-01

    Full Text Available Ceramic matrix composites (CMCs are being designed and developed for engine and exhaust components in commercial aviation, because they offer higher temperature capabilities, weight savings, and improved durability compared to metals. The United States Federal Aviation Administration (FAA issues and enforces regulations and minimum standards covering the safe manufacture, operation, and maintenance of civil aircraft. As new materials, these ceramic composite components will have to meet the certification regulations of the FAA for “airworthiness”. The FAA certification process is defined in the Federal Aviation Regulations (Title 14 of the Code of Federal Regulations, FAA policy statements, orders, advisory circulars, technical standard orders, and FAA airworthiness directives. These regulations and documents provide the fundamental requirements and guidelines for design, testing, manufacture, quality assurance, registration, operation, inspection, maintenance, and repair of aircraft systems and parts. For metallic parts in aircraft, the FAA certification and compliance process is well-established for type and airworthiness certification, using ASTM and SAE standards, the MMPDS data handbook, and FAA advisory circulars. In a similar manner for polymer matrix composites (PMC, the PMC industry and the FAA have jointly developed and are refining parallel guidelines for polymer matrix composites (PMCs, using guidance in FAA circulars and the CMH-17 PMC handbook. These documents discuss design methods and codes, material testing, property data development, life/durability assessment, production processes, QA procedures, inspection methods, operational limits, and repairs for PMCs. For ceramic composites, the FAA and the CMC and aerospace community are working together (primarily through the CMH-17 CMC handbook to define and codify key design, production, and regulatory issues that have to be addressed in the certification of CMC components in

  20. The inequity of the Swiss health care system financing from a federal state perspective

    Science.gov (United States)

    2014-01-01

    Introduction Previous studies have shown that Swiss health-care financing is particularly regressive. However, as it has been emphasized in the 2011 OECD Review of the Swiss Health System, the inter cantonal variations of income-related inequities are still broadly unexplored. The present paper aims to fill this gap by analyzing the differences in the level of equity of health-care system financing across cantons and its evolution over time using household data. Methods Following the methodology proposed by Wagstaff et al. (JHE 11:361–387, 1992) we use the Kakwani index as a summary measure of regressivity and we compute it for each canton and for each of the sources that have a role in financing the health care system. We graphed concentration curves and performed relative dominance tests, which utilize the full distribution of expenditures. The microdata come from the Swiss Household Income and Expenditure Survey (SHIES) based on a sample of the Swiss population (about 3500 households per year), for the years 1998 - 2005. Results The empirical evidence confirms that the health-care financing in Switzerland has remained regressive since the major reform of 1996 and shows that the variations in equity across cantons are quite significant: the difference between the most and the least regressive canton is about the same as between two extremely different financing systems like the US and Sweden. There is no evidence, instead, of a clear evolution over time of regressivity. Conclusions The significant variation in equity across cantons can be explained by fiscal federalism and the related autonomy in the design of tax and social policies. In particular, the results highlight that earmarked subsidies, the policy adopted to smooth the regressivity of the premiums, appear to be not enough; in the practice of federal states the combination of allowances with mandatory community-rated health insurance premiums might lead to a modest outcome in terms of equity. PMID

  1. A projective surgical navigation system for cancer resection

    Science.gov (United States)

    Gan, Qi; Shao, Pengfei; Wang, Dong; Ye, Jian; Zhang, Zeshu; Wang, Xinrui; Xu, Ronald

    2016-03-01

    Near infrared (NIR) fluorescence imaging technique can provide precise and real-time information about tumor location during a cancer resection surgery. However, many intraoperative fluorescence imaging systems are based on wearable devices or stand-alone displays, leading to distraction of the surgeons and suboptimal outcome. To overcome these limitations, we design a projective fluorescence imaging system for surgical navigation. The system consists of a LED excitation light source, a monochromatic CCD camera, a host computer, a mini projector and a CMOS camera. A software program is written by C++ to call OpenCV functions for calibrating and correcting fluorescence images captured by the CCD camera upon excitation illumination of the LED source. The images are projected back to the surgical field by the mini projector. Imaging performance of this projective navigation system is characterized in a tumor simulating phantom. Image-guided surgical resection is demonstrated in an ex-vivo chicken tissue model. In all the experiments, the projected images by the projector match well with the locations of fluorescence emission. Our experimental results indicate that the proposed projective navigation system can be a powerful tool for pre-operative surgical planning, intraoperative surgical guidance, and postoperative assessment of surgical outcome. We have integrated the optoelectronic elements into a compact and miniaturized system in preparation for further clinical validation.

  2. The Russian Federal Information System for Nuclear Material Control and Accounting: Yesterday, Today and Tomorrow

    International Nuclear Information System (INIS)

    Martyanov, A.A.; Pitel, V.A.; Berchik, V.P.; Kasumova, L.A.; Babcock, R.A.; Kilmartin, W.E.; Heinberg, C.L.

    2002-01-01

    Most enterprises in the Russian Federation are not prepared to report to the Russian Federal Nuclear Material Control and Accounting Information System (FIS) by the full function reporting method. The full function reporting method requires reporting inventory listings on a schedule based on nuclear material category, submission of individual inventory change reports, and reconciliation and closeout at the end of each reporting period. Most Russian enterprises do not have automated systems and do not have the resources to develop and implement such systems. Over the last two years, MinAtom put the regulations and national level nuclear material control and accounting (MC and A) software in place to require all enterprises in the Russian Federation to report summarized inventory listings to the FIS in January 2002. Enterprises do not need automated systems to comply with summarized reporting requirements. Along with the approximately 25% of the total Category 1 Material Balance Areas (MBAs) using full function reporting, the addition of this complete summarized inventory makes the FIS a more valuable tool for MinAtom management. The FIS is now poised to complete the work by improving the integrity and reliability of the data through increasing the number of enterprises and MBAs using full function reporting. There are obstacles and issues that must be dealt with along the way to achieving the final goal of every MBA sending inventory and inventory change reports using the full function reporting method. Summarized reporting is a major step toward this final goal. Currently all MBAs using full function reporting are doing so under a U.S. contract. FIS management recognized full function reporting could not be implemented in the near-term and prepared a plan with immediate, intermediate, and long-term FIS tasks. To address the major obstacles and optimize implementation, two paths need to be followed in parallel: developing the regulatory basis and overcoming

  3. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  4. 78 FR 9771 - Federal Highway Administration

    Science.gov (United States)

    2013-02-11

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois and Indiana AGENCY: Federal Highway Administration...., Acting Division Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield...

  5. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  6. CooMan - a global collaborative project management system

    International Nuclear Information System (INIS)

    Souza, J.M. de; Palma, S.

    1994-01-01

    Project Coordination and Management have long been recognized as an area with growing problems and unsatisfactory solutions. Conciliating flexibility with target achievements is historically the main problem to face. The difficulties have been growing at more than linear ratio with the size and complexity of the Projects being developed in the present days. The HEP communities suffer additional challenges because of the distributed nature of the collaborations, the novelty of each project; and the less authoritarian form of leadership and management of team and individual. This prevents the adoption of more centralized focus on decision. CooMan intends to be a Global Collaborative Project Management System. This paper discusses the basic aspects of the concepts involved, outlining how task coordination, acts of speech, and World-Wide hyper media can be used to support project management activities. A distributed tool to implement such proposition is described, and a first prototype is presented

  7. Reports on research projects in the field of reactor safety sponsored by BMFT (Federal Ministry for Science and Technology)

    International Nuclear Information System (INIS)

    1982-03-01

    The GRS (Reactor Safety Association), Gesellschaft fuer Reaktorsicherheit mbH, by order of the BMFT, informs continuously of the status of such investigations by means of semi-annual and annual publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the FB (Research Coordination Department), Forschungsbetreuung at the GRS, within the framework of general information of progress in reactor safety research. The individual reports are classified according to the Research Program on the Safety of LWRs 1977-1980 of the BMFT. Another table of contents uses the same classification system as applied in the Nuclear Safety Index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in the sequence of their project numbers. (orig.) [de

  8. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  9. The ESPRIT project CAFE : high security digital payment systems

    NARCIS (Netherlands)

    Boly, J.P.; Bosselaers, A.; Cramer, R.; Michelsen, R.; Mjølsnes, S.F.; Muller, F.; Pedersen, T.P.; Pfitzmann, B.; Rooij, de P.; Schoenmakers, B.; Schunter, M.; Vallée, L.; Waidner, M.; Gollmann, D.

    1994-01-01

    CAFE (“Conditional Access for Europe”) is an ongoing project in the European Community's ESPRIT program. The goal of CAFE is to develop innovative systems for conditional access, and in particular, digital payment systems. An important aspect of CAFE is high security of all parties concerned, with

  10. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  11. Realization of economic evaluation expert system for uranium mine project

    International Nuclear Information System (INIS)

    Wang Haifeng

    1993-01-01

    By studying the EVALUATOR, economic evaluation expert system of uranium mine project, the theoretical fundamentals of expert system, principle of inference mechanism, implementation of knowledge base, realization of explanation mechanism, acquisition of domain knowledge and representation of knowledge were described, especially the subjective Bayes approach for inexact reasoning problem used in EVALUATOR was discussed in detail

  12. MULTIPLE PROJECTIONS SYSTEM (MPS) - USER'S MANUAL VERSION 1.0

    Science.gov (United States)

    The report is a user's manual for version 1.0 of the Multiple Projections Systems (MPS), a computer system that can perform "what if" scenario analysis and report the final results (i.e., Rate of Further Progress - ROP - inventories) to EPA (i.e., the Aerometric Information Retri...

  13. Distribution of Financial Resources Within the Budget System of the Russian Federation and Regions’ Economic Growth

    Directory of Open Access Journals (Sweden)

    Artyom Gennadyevich Isaev

    2016-12-01

    Full Text Available This article examines the impact of central government transfers and other sources of regional budget revenues (income tax and property tax on per capita GRP growth in Russian regions. Analysis is based on official data of 78 regions for the period 2005-2014. The results indicate that transfers, while intending to be an instrument of regional incomes equalization, are negatively associated with economic growth of Russian regions, which contrasts with other estimates of federal transfers’ impact on regional economic growth in Russia. This phenomenon can be explained by high rate of social expenditures in regional governments’ spending. At the same time there is positive relationship between regional budget’s investment and economic growth that indicates significant role of public goods for regional economic development. This study can be considered as confirmation of those conclusions concerning impact of fiscal decentralization on economic growth of Russian regions which claim that current system of intergovernmental relations on sub-national level cannot embody the benefits of fiscal federalism as a principle of effective regional development. Significant factors of regional per capita GRP growth are own sources of region’s budget revenues which reflect costs of doing business. So the rise in property taxes retards economic growth in a region. For the regional authorities it makes sense to operate more flexibly with this tool, especially in periods of economic recession when inflow of corporate income tax to budget tends to decrease

  14. IAEA safeguards information system re-engineering project (IRP)

    International Nuclear Information System (INIS)

    Whitaker, G.; Becar, J.-M.; Ifyland, N.; Kirkgoeze, R.; Koevesd, G.; Szamosi, L.

    2007-01-01

    The Safeguards Information System Re-engineering Project (IRP) was initiated to assist the IAEA in addressing current and future verification and analysis activities through the establishment of a new information technology framework for strengthened and integrated safeguards. The Project provides a unique opportunity to enhance all of the information services for the Department of Safeguards and will require project management 'best practices' to balance limited funds, available resources and Departmental priorities. To achieve its goals, the Project will require the participation of all stakeholders to create a comprehensive and cohesive plan that provides both a flexible and stable foundation for address changing business needs. The expectation is that high quality integrated information systems will be developed that incorporate state-of-the-art technical architectural standards, improved business processes and consistent user interfaces to store various data types in an enterprise data repository which is accessible on-line in a secure environment. (author)

  15. Federated Identity Management

    OpenAIRE

    Chadwick, David W.

    2009-01-01

    Abstract. This paper addresses the topic of federated identity management. It discusses in detail the following topics: what is digital identity, what is identity management, what is federated identity management, Kim Camerons 7 Laws of Identity, how can we protect the users privacy in a federated environment, levels of assurance, some past and present federated identity management systems, and some current research in FIM.

  16. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Technology of the Federal Republic of Germany. Reporting period 2005. Progress report

    International Nuclear Information System (INIS)

    2005-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technology (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system 'Joint Safety Research Index' of the CEC (Commission of the European Communities). The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  17. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Labour of the Federal Republic of Germany. Reporting period 2004. Progress report

    International Nuclear Information System (INIS)

    2004-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technology (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system 'Joint Safety Research Index' of the CEC (Commission of the European Communities). The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  18. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Labour of the Federal Republic of Germany. Reporting period 2004. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technology (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system 'Joint Safety Research Index' of the CEC (Commission of the European Communities). The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  19. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.

  20. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    International Nuclear Information System (INIS)

    1980-12-01

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume

  1. Feasibility of integrating other federal information systems into the Global Network of Environment and Technology, GNET{reg_sign}

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Global Environment and Technology Enterprise (GETE) of the Global Environment and Technology Foundation (GETF) has been tasked by the US Department of Energy`s (DOE), Federal Energy Technology Center (FETC) to assist in reducing DOE`s cost for the Global Network of Environment and Technology (GNET{reg_sign}). As part of this task, GETE is seeking federal partners to invest in GNET{reg_sign}. The authors are also seeking FETC`s commitment to serve as GNET`s federal agency champion promoting the system to potential agency partners. This report assesses the benefits of partnering with GNET{reg_sign} and provides recommendations for identifying and integrating other federally funded (non-DOE) environmental information management systems into GNET{reg_sign}.

  2. Analytical simulation platform describing projections in computed tomography systems

    International Nuclear Information System (INIS)

    Youn, Hanbean; Kim, Ho Kyung

    2013-01-01

    To reduce the patient dose, several approaches such as spectral imaging using photon counting detectors and statistical image reconstruction, are being considered. Although image-reconstruction algorithms may significantly enhance image quality in reconstructed images with low dose, true signal-to-noise properties are mainly determined by image quality in projections. We are developing an analytical simulation platform describing projections to investigate how quantum-interaction physics in each component configuring CT systems affect image quality in projections. This simulator will be very useful for an improved design or optimization of CT systems in economy as well as the development of novel image-reconstruction algorithms. In this study, we present the progress of development of the simulation platform with an emphasis on the theoretical framework describing the generation of projection data. We have prepared the analytical simulation platform describing projections in computed tomography systems. The remained further study before the meeting includes the following: Each stage in the cascaded signal-transfer model for obtaining projections will be validated by the Monte Carlo simulations. We will build up energy-dependent scatter and pixel-crosstalk kernels, and show their effects on image quality in projections and reconstructed images. We will investigate the effects of projections obtained from various imaging conditions and system (or detector) operation parameters on reconstructed images. It is challenging to include the interaction physics due to photon-counting detectors into the simulation platform. Detailed descriptions of the simulator will be presented with discussions on its performance and limitation as well as Monte Carlo validations. Computational cost will also be addressed in detail. The proposed method in this study is simple and can be used conveniently in lab environment

  3. An accurate projection algorithm for array processor based SPECT systems

    International Nuclear Information System (INIS)

    King, M.A.; Schwinger, R.B.; Cool, S.L.

    1985-01-01

    A data re-projection algorithm has been developed for use in single photon emission computed tomography (SPECT) on an array processor based computer system. The algorithm makes use of an accurate representation of pixel activity (uniform square pixel model of intensity distribution), and is rapidly performed due to the efficient handling of an array based algorithm and the Fast Fourier Transform (FFT) on parallel processing hardware. The algorithm consists of using a pixel driven nearest neighbour projection operation to an array of subdivided projection bins. This result is then convolved with the projected uniform square pixel distribution before being compressed to original bin size. This distribution varies with projection angle and is explicitly calculated. The FFT combined with a frequency space multiplication is used instead of a spatial convolution for more rapid execution. The new algorithm was tested against other commonly used projection algorithms by comparing the accuracy of projections of a simulated transverse section of the abdomen against analytically determined projections of that transverse section. The new algorithm was found to yield comparable or better standard error and yet result in easier and more efficient implementation on parallel hardware. Applications of the algorithm include iterative reconstruction and attenuation correction schemes and evaluation of regions of interest in dynamic and gated SPECT

  4. Federal Emergency Management Information System (FEMIS) Data Management Guide for FEMIS Version 1.4.6

    Energy Technology Data Exchange (ETDEWEB)

    Angel, L.K.; Bower, J.C.; Burnett, R.A.; Downing, T.R.; Fangman, P.M.; Hoza, M.; Johnson, D.M.; Johnson, S.M.; Loveall, R.M.; Millard, W.D.; Schulze, S.A.; Wood, B.M.

    1999-06-29

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are corrected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication data distribution and notification functionality necessary to operate FEMIS in a networked, client/server environment.

  5. Relationships of nuclear, architectural and International Federation of Gynecology and Obstetrics grading systems in endometrial cancer.

    Science.gov (United States)

    Toptaş, Tayfun; Peştereli, Elif; Bozkurt, Selen; Erdoğan, Gülgün; Şimşek, Tayup

    2018-03-01

    To examine correlations among nuclear, architectural, and International Federation of Gynecology and Obstetrics (FIGO) grading systems, and their relationships with lymph node (LN) involvement in endometrioid endometrial cancer. Histopathology slides of 135 consecutive patients were reviewed with respect to tumor grade and LN metastasis. Notable nuclear atypia was defined as grade 3 nuclei. FIGO grade was established by raising the architectural grade (AG) by one grade when the tumor was composed of cells with nuclear grade (NG) 3. Correlations between the grading systems were analyzed using Spearman's rank correlation coefficients, and relationships of grading systems with LN involvement were assessed using logistic regression analysis. Correlation analysis revealed a significant and strongly positive relationship between FIGO and architectural grading systems (r=0.885, p=0.001); however, correlations of nuclear grading with the architectural (r=0.535, p=0.165) and FIGO grading systems (r=0.589, p=0.082) were moderate and statistically non-significant. Twenty-five (18.5%) patients had LN metastasis. LN involvement rates differed significantly between tumors with AG 1 and those with AG 2, and tumors with FIGO grade 1 and those with FIGO grade 2. In contrast, although the difference in LN involvement rates failed to reach statistical significance between tumors with NG 1 and those with NG 2, it was significant between NG 2 and NG 3 (p=0.042). Although all three grading systems were associated with LN involvement in univariate analyses, an independent relationship could not be established after adjustment for other confounders in multivariate analysis. Nuclear grading is significantly correlated with neither architectural nor FIGO grading systems. The differences in LN involvement rates in the nuclear grading system reach significance only in the setting of tumor cells with NG 3; however, none of the grading systems was an independent predictor of LN involvement.

  6. Diabetes Care and Treatment Project: A Diabetes Institute of the Walter Reed Health Care System and Joslin (and University of Hawaii) Telemedicine Initiative

    Science.gov (United States)

    2010-04-01

    digital teleophthalmology system as used by three federal healthcare agencies for detecting proliferative diabetic retinopathy . Telemedicine and e...Research Group. Detection of diabetic macular edema: ophthalmoscopy versus photography—Early Treatment Diabetic Retinopathy Study report number 5...project are the establishment of a telemedicine system for comprehensive diabetes management and the assessment of diabetic retinopathy that

  7. ARRA FEMP Technical Assistance -- Federal Aviation Administration Project 209 -- Control Tower and Support Building, Palm Springs, CA

    Energy Technology Data Exchange (ETDEWEB)

    Arends, J.; Sandusky, William F.

    2010-03-31

    This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  8. Energetic Systems

    Data.gov (United States)

    Federal Laboratory Consortium — The Energetic Systems Division provides full-spectrum energetic engineering services (project management, design, analysis, production support, in-service support,...

  9. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  10. Decentralization and centralization in a federal system: the case of democratic Brazil

    Directory of Open Access Journals (Sweden)

    Maria Hermínia Tavares de Almeida

    2006-01-01

    Full Text Available This paper discusses the contradictory impulses towards decentralization and centralization in Brazil during the 1990s and early 2000s. After discussing the analytical issues related to the specific nature of decentralization in federal systems, the paper examines two sets of policy issues: those regulating the fiscal relations between national and sub-national governments and those redefining responsibilities for social services provision (basic education, health care, social assistance. Against conventional academic wisdom, it sustains that although there has been some re-centralization of fiscal decisions and of targeted income transfer programs, a clear re-centralization tendency cannot be siad to exist. Decentralization and centralization trends coexist propelled by different forces, with different motives and different outcomes.

  11. System engineering and science projects: lessons from MeerKAT

    Science.gov (United States)

    Kapp, Francois

    2016-08-01

    The Square Kilometre Array (SKA) is a large science project planning to commence construction of the world's largest Radio Telescope after 2018. MeerKAT is one of the precursor projects to the SKA, based on the same site that will host the SKA Mid array in the central Karoo area of South Africa. From the perspective of signal processing hardware development, we analyse the challenges that MeerKAT encountered and extrapolate them to SKA in order to prepare the System Engineering and Project Management methods that could contribute to a successful completion of SKA. Using the MeerKAT Digitiser, Correlator/Beamformer and Time and Frequency Reference Systems as an example, we will trace the risk profile and subtle differences in engineering approaches of these systems over time and show the effects of varying levels of System Engineering rigour on the evolution of their risk profiles. It will be shown that the most rigorous application of System Engineering discipline resulted in the most substantial reduction in risk over time. Since the challenges faced by SKA are not limited to that of MeerKAT, we also look into how that translates to a system development where there is substantial complexity in both the created system as well as the creating system. Since the SKA will be designed and constructed by consortia made up from the ten member countries, there are many additional complexities to the organisation creating the system - a challenge the MeerKAT project did not encounter. Factors outside of engineering, for instance procurement models and political interests, also play a more significant role, and add to the project risks of SKA when compared to MeerKAT.

  12. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  13. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  14. Sandia photovoltaic systems definition and application experiment projects

    Energy Technology Data Exchange (ETDEWEB)

    Jones, G.

    1983-04-01

    A compilation is given of the abstracts and visual material used in presentation at the Fourth Photovoltaic Systems Definition and Applications Projects Integration Meeting held at the Marriott Hotel, April 12-14, 1983, in Albuquerque, New Mexico. The meeting provided a forum for detailed analyses on recently completed and current activities. These activities include systems research, balance-of-system technology development, residential experimentation, and evaluation of intermediate-sized applications.

  15. SNF sludge treatment system preliminary project execution plan

    International Nuclear Information System (INIS)

    Flament, T.A.

    1998-01-01

    The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS

  16. Project 11. Cowpea - Cereals Systems Improvement in the Dry Savannas

    International Nuclear Information System (INIS)

    1998-01-01

    The research agenda of the IITA is subdivided into a portfolio of 16 projects (Annex 1), around which these annual reports are prepared. These projects address different aspects of attaining sustainable increases in productivity of dominant farming systems and utilization practices in the various agroecologies of Sub-Saharan Africa (SSA). Research and training activities carried out in the 16 projects are being implemented together with national program partners in order to increase the well-being of poor people in SSA through higher levels of food production, better income and nutritional status, and reduced drudgery - particularly for women. Additionally IITA serves as the convening centre for the Ecoregional Program for the Humid and Sub Humid Tropics of Sub-Saharan Africa (EPHTA) and the Systemwide Project on Integrated Pest Management (SP-IPM). The institute-wide log frame (Annex 2) shows the expected contribution of each project to the overall institute goal, with the specific project log frame presented in Annex 3. Highlights from all these projects can be found in Annex 4, which thus provides an illustrative overview of IITA's research activities and achievements of the year. Annex 5 shows all the agroecological zones of sub-saharan Africa in which IITA conducts research. The project management arrangement for implementing IITA's research agenda is relatively new, and continues to evolve from a divisional/program structure. In earlier years, detailed research outputs and achievements were reported in divisional reports; this is the third year that implementation of IITA's research agenda is being presented in individual project reports. To satisfy the continuing needs of disciplinary groups in partner and other interested institutions, portions from the individual project reports will be collated into subject matter reports corresponding to current research divisions -Crop improvement, Plant Health Management, and Resource and Crop Management

  17. National energy and nuclear power system plans of the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schmidt-Kuester, W.J.

    1977-01-01

    Continuous and secure procurement of energy is of vital importance for our national economy. This has been demonstrated drastically during and after the energy crisis in 1973. Therefore, the aim of energy policy in the Federal Republic of Germany is to make energy available: (1) in always sufficient quantities; (2) with a maximum degree of security of supply; (3) in a way to protect the environment to a maximum extent; (4) at the cheapest possible cost to the economy. The other aim of our energy policy is to diversify the basis of primary energy sources in order to reduce our dependence on imported oil as fast as this is possible under reasonable economic conditions. For these reasons our efforts are concentrated on the development of nuclear and new non-nuclear energy sources as well as on the development of technologies on energy conservation. The concept of the Federal Republic of Germany for the development of new energy sources is outlined in the FRG program of energy research and technology. It combines the continuation of the 4. nuclear program of FRG (1973-1976) and the skeleton program of non-nuclear energy research (1974-1977). In continuation of existing activites the main object of the new program will be again the development of nuclear energy concentrating on advanced reactor systems, nuclear fuel cycle and safety and radiation protection research. In addition large efforts are made in the area of coal technology, the development of new primary and secondary energy sources and methods for energy conservation. Until 1985 in the FRG the percentage of nuclear energy will be increased from 2% of today to 15% in 1985, i.e. approximately 45.000 MWe. The development of nuclear power systems will be performed by industry and nuclear research centers. At present there are about 25.000 people working in this area

  18. Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center(FRMAC) - Emergency Phase

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Homeland Security Presidential Directive HSPD-5 requires all federal departments and agencies to adopt a National Incident Management System (NIMS)/Incident Command System (ICS) and use it in their individual domestic incident management and emergency prevention, preparedness, response, recovery, and mitigation programs and activities, as well as in support of those actions taken to assist state and local entities. This system provides a consistent nationwide template to enable federal, state, local, and tribal governments, private-sector, and nongovernmental organizations to work together effectively and efficiently to prepare for, prevent, respond to, and recover from domestic incidents, regardless of cause, size, or complexity, including acts of catastrophic terrorism. This document identifies the operational concepts of the Federal Radiological Monitoring and Assessment Center's (FRMAC) implementation of the NIMS/ICS response structure under the National Response Plan (NRP). The construct identified here defines the basic response template to be tailored to the incident-specific response requirements. FRMAC's mission to facilitate interagency environmental data management, monitoring, sampling, analysis, and assessment and link this information to the planning and decision staff clearly places the FRMAC in the Planning Section. FRMAC is not a mitigating resource for radiological contamination but is present to conduct radiological impact assessment for public dose avoidance. Field monitoring is a fact-finding mission to support this effort directly. Decisions based on the assessed data will drive public protection and operational requirements. This organizational structure under NIMS is focused by the mission responsibilities and interface requirements following the premise to provide emergency responders with a flexible yet standardized structure for incident response activities. The coordination responsibilities outlined in the NRP are based on the NIMS

  19. 11th International Federation of Automatic Control (IFAC) Workshop on Time-Delay Systems

    CERN Document Server

    Fridman, Emilia; Sename, Olivier; Dugard, Luc

    2016-01-01

    This book mostly results from a selection of papers presented during the 11th IFAC (International Federation of Automatic Control) Workshop on Time-Delay Systems, which took place in Grenoble, France, February 4 - 6, 2013.  During this event, 37 papers were presented. Taking into account the reviewers' evaluation and the papers' presentation the best papers have been selected and collected into the present volume. The authors of 13 selected papers were invited to participate to this book and provided a more detailed and improved version of the conference paper. To enrich the book, three more chapters have been included from specialists on time-delay systems who presented their work during the 52nd IEEE Conference on Decision and Control, which held in December 10 - 13, 2013, at Florence, Italy. The content of the book is divided into four main parts as follows: Modeling, Stability analysis, Stabilization and control, and Input-delay systems. Focusing on various topics of time-delay systems, this book will be...

  20. Unmanned Aircraft Systems Integration in the National Airspace System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — There is an increasing need to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) to perform missions of vital importance to national security...

  1. A modular projection autostereoscopic system for stereo cinema

    Science.gov (United States)

    Elkhov, Victor A.; Kondratiev, Nikolai V.; Ovechkis, Yuri N.; Pautova, Larisa V.

    2009-02-01

    The lenticular raster system for 3D movies non-glasses show designed by NIKFI demonstrated commercially in Moscow in the 40'st of the last century. Essential lack of this method was narrow individual viewing zone as only two images on the film used. To solve this problem, we propose to use digital video projective system with modular principle of its design. Increase of the general number of the pixels forming the stereo image is reached by using of more than one projector. The modular projection autostereoscopic system for demonstration of the 3D movies includes diffuser screen; lenticular plate located in front of the screen; projective system consisted from several projectors and the block of parallax panoramogram fragments creator. By means of this block the parallax panoramogram is broken into fragments which quantity corresponds to number of projectors. For the large dimension lenticular screen making rectangular fragments of inclined raster were joined in a uniform leaf. To obtain the needed focal distance of the screen lenses we used immersion - aqueous solution of glycerin. The immersion also let essentially decrease visibility of fragments joints. An experimental prototype of the modular projection autostereoscopic system was created to validate proposed system.

  2. Building a global federation system for climate change research: the earth system grid center for enabling technologies (ESG-CET)

    International Nuclear Information System (INIS)

    Ananthakrishnan, R; Bernholdt, D E; Bharathi, S; Brown, D; Chen, M; Chervenak, A L; Cinquini, L; Drach, R; Foster, I T; Fox, P; Fraser, D; Halliday, K; Hankin, S; Jones, P; Kesselman, C; Middleton, D E; Schwidder, J; Schweitzer, R; Schuler, R; Shoshani, A; Siebenlist, F; Sim, A; Strand, W G; Wilhelmi, N; Su, M; Williams, D N

    2007-01-01

    The recent release of the Intergovernmental Panel on Climate Change (IPCC) 4th Assessment Report (AR4) has generated significant media attention. Much has been said about the US role in this report, which included significant support from the Department of Energy through the Scientific Discovery through Advanced Computing (SciDAC) and other Department of Energy (DOE) programs for climate model development and the production execution of simulations. The SciDAC-supported Earth System Grid Center for Enabling Technologies (ESG-CET) also played a major role in the IPCC AR4: all of the simulation data that went into the report was made available to climate scientists worldwide exclusively via the ESG-CET At the same time as the IPCC AR4 database was being developed, the National Center for Atmospheric Research (NCAR), a leading US climate science laboratory and a ESG participant, began publishing model runs from the Community Climate System Model (CCSM), and its predecessor the Parallel Coupled Model (PCM) through ESG In aggregate, ESG-CET provides seamless access to over 180 terabytes of distributed climate simulation data to over 6,000 registered users worldwide, who have taken delivery of more than 250 terabytes from the archive. Not only does this represent a substantial advance in scientific knowledge, it is also a major step forward in how we conduct the research process on a global scale. Moving forward, the next IPCC assessment report, AR5, will demand multi-site metadata federation for data discovery and cross-domain identity management for single sign-on of users in a more diverse federation enterprise environment. Towards this aim, ESG is leading the effort in the climate community towards standardization of material for the global federation of metadata, security, and data services required to standardize, analyze, and access data worldwide

  3. Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

    Science.gov (United States)

    Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

  4. Report of fiscal 1999 basic survey for promoting joint implementation, etc. Combined cycle power generation project for Surgut No.1 power station in the Russian Federation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper explains fiscal 1999 survey on a combined cycle power generation project for Surgut power plant in the Russian Federation for the purpose of making the project tied to the COP3 joint implementation. This power plant consists of 16 units with the total capacity of 3,300 MW. This project is to replace the existing superannuated No.1 through No.6 units with a new high-efficiency gas combined cycle power plant. The project plant is planned to comprise of three units, having the capacity of 417 MW, each consisting of one gas turbine and one steam turbine. The average generation efficiency will be improved tremendously from the present 37.2% to 55.2%. The initial investment will be 615 million in US dollars (at 109.2 yen/dollar). Energy saving will be 634,800 toe/year, with cost to effect 9,452 toe-y/million yen. Greenhouse effect gas reduction will be 1,509,000 t-CO2/year, with cost to effect 22.5 t-CO2-y/million yen. The investment recovery period is estimated to be 24 years. The Russian side strongly wishes to be granted a finance on a favorable terms and conditions to realize this project. It is possible that the Russian government requests Japan for grant of the Yen credit. Accordingly, an early start is necessary in order to deal with such request. (NEDO)

  5. Statement of work for the immobilized high-level waste transportation system, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Mouette, P.

    1998-06-24

    The objective of this Statement of Work (SOW) is to present the scope, the deliverables, the organization, the technical and schedule expectations for the development of a Package Design Criteria (PDC), cost and schedule estimate for the acquisition of a transportation system for the Immobilized High-Level Waste (IHLW). This transportation system which includes the truck, the trailer, and a shielded cask will be used for on-site transportation of the IHLW canisters from the private vendor vitrification facility to the Hanford Site interim storage facility, i.e., vaults 2 and 3 of the Canister Storage Building (CSB). This Statement of Work asks Waste Management Federal Services, Inc., Northwest Operations, to provide Project W-464 with a Design Criteria Document, plus a life-cycle schedule and cost estimate for the acquisition of a transportation system (shielded cask, truck, trailer) for IHLW on-site transportation.

  6. Debris Removal Project K West Canister Cleaning System Performance Specification

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    1999-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. Design criteria for a Canister Cleaning System to be installed in the KW Basin. This documents the requirements for design and installation of the system

  7. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  8. Modified scaling function projective synchronization of chaotic systems

    International Nuclear Information System (INIS)

    Xu Yu-Hua; Zhou Wu-Neng; Fang Jian-An

    2011-01-01

    This paper investigates a kind of modified scaling function projective synchronization of uncertain chaotic systems using an adaptive controller. The given scaling function in the new method can be an equilibrium point, a periodic orbit, or even a chaotic attractor in the phase space. Based on LaSalle's invariance set principle, the adaptive control law is derived to make the states of two chaotic systems function projective synchronized. Some numerical examples are also given to show the effectiveness of the proposed method. (general)

  9. An Historical Analysis and Comparison of the Military Retirement System and the Federal Employee Retirement system

    National Research Council Canada - National Science Library

    Breth, Bruce

    1998-01-01

    The most significant change to private sector as well as civil service employee retirement systems over the past 15 years has been the transition from defined benefit to defined contribution retirement plans...

  10. GRANT FINANCIAL SYSTEM REQUIREMENTS; Checklist for Reviewing Systems Under the Federal Financial Management Improvement Act

    National Research Council Canada - National Science Library

    2001-01-01

    ...) of 1996, issued September 9, 1997. JFMIP intends for the requirements to promote understanding of key financial management systems concepts and requirements, to provide a framework for establishing integrated financial management...

  11. Image reconstruction technique using projection data from neutron tomography system

    Directory of Open Access Journals (Sweden)

    Waleed Abd el Bar

    2015-12-01

    Full Text Available Neutron tomography is a very powerful technique for nondestructive evaluation of heavy industrial components as well as for soft hydrogenous materials enclosed in heavy metals which are usually difficult to image using X-rays. Due to the properties of the image acquisition system, the projection images are distorted by several artifacts, and these reduce the quality of the reconstruction. In order to eliminate these harmful effects the projection images should be corrected before reconstruction. This paper gives a description of a filter back projection (FBP technique, which is used for reconstruction of projected data obtained from transmission measurements by neutron tomography system We demonstrated the use of spatial Discrete Fourier Transform (DFT and the 2D Inverse DFT in the formulation of the method, and outlined the theory of reconstruction of a 2D neutron image from a sequence of 1D projections taken at different angles between 0 and π in MATLAB environment. Projections are generated by applying the Radon transform to the original image at different angles.

  12. Function projective lag synchronization of fractional-order chaotic systems

    International Nuclear Information System (INIS)

    Wang Sha; Yu Yong-Guang; Wang Hu; Rahmani Ahmed

    2014-01-01

    Function projective lag synchronization of different structural fractional-order chaotic systems is investigated. It is shown that the slave system can be synchronized with the past states of the driver up to a scaling function matrix. According to the stability theorem of linear fractional-order systems, a nonlinear fractional-order controller is designed for the synchronization of systems with the same and different dimensions. Especially, for two different dimensional systems, the synchronization is achieved in both reduced and increased dimensions. Three kinds of numerical examples are presented to illustrate the effectiveness of the scheme. (general)

  13. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  14. HTR-E project. High-temperature components and systems

    International Nuclear Information System (INIS)

    Breuil, E.; Exner, R.

    2002-01-01

    The HTR-E European project (four years project) is proposed for the 5th Framework Programme and concerns the technical developments needed for the innovative components of a modern HTR with a direct cycle. These components have been selected with reference to the present projects (GT-MHR, PBMR): (1) the helium turbine, the recuperator heat exchanger, the electro-magnetic bearings and the helium rotating seal; (2) the tribology. Sliding innovative components in helium environment are particularly concerned. (3) the helium purification system. Recommendations on impurities contents have to be provided in accordance with the materials proposed for the innovative components. The main outcomes expected from the HTR-E project are the design recommendations and identification of further R and D needs for these components. This will be based: (1) on experience feedback from European past helium test loops and reactors; (2) on design studies, thermal-hydraulic and structural analyses; (3) and on experimental tests

  15. Future market hybride drive systems. Case study on behalf of the Federal Office for Environment Protection in the context of the research project Innovative Environmental policy in important action fields; Zukunftsmarkt Hybride Antriebstechnik. Fallstudie im Auftrag des Umweltbundesamtes im Rahmen des Forschungsprojektes Innovative Umweltpolitik in wichtigen Handlungsfeldern

    Energy Technology Data Exchange (ETDEWEB)

    Doll, Claus [Fraunhofer-Institut fuer Systemtechnik und Innovationsforschung (ISI), Karlsruhe (Germany)

    2007-12-15

    Hybrid electric vehicles allow driving quietly and locally emission-free because the internal combustion engine is run in a more favorable load range, while the highly efficient electric motor supports at low speeds and in acceleration phases. Further reductions in fuel consumption are achieved by down sizing the combustion engine and by recuperating brake energy back into the battery. However, the actual environmental and energy advantage strongly depends on driving styles and driving cycles. The technology dynamics of hybrid propulsion systems appears more intensive than the dynamics of its core components: combustion engine, electric motors and energy storage technology. Due to its higher price and the more expensive maintenance the destination countries of the technology are most likely located in North America, Europe, Japan, Australia and the metropolises of South America and Southeast Asia. However, estimates of future market potential widely diverge. With regard to technology, Japan, the United States, France and Sweden are the most important competitors for Germany. European producers, however, are completely dependent on imports and lag sufficient technology competence in key areas, namely in the field of battery technology. Due to specific preconditions and national incentive systems, the competing countries are on different stages of the development processes. Important is the disapproval of diesel for cars in Japan and the USA but also tax incentives and special conditions for hybrid cars, e. g. the Congestion Charge in London. Although Japan appears as the technology leader in the field of hybrid electric vehicles, Germany holds 40 % and the EU 27 60 % of the worldwide patent applications of hybrid propulsion systems and their components. These figures indicate a nameable technological and economic potential of Europe, and especially of Germany, in the field of hybrid propulsion technology, which are the result of the productive and internationally

  16. Acceptance of failed SNF [spent nuclear fuel] assemblies by the Federal Waste Management System

    International Nuclear Information System (INIS)

    1990-03-01

    This report is one of a series of eight prepared by E. R. Johnson Associates, Inc. (JAI) under ORNL's contract with DOE's OCRWM Systems Integration Program and in support of the Annual Capacity Report (ACR) Issue Resolution Process. The report topics relate specifically to the list of high priority technical waste acceptance issues developed jointly by DOE and a utility-working group. JAI performed various analyses and studies on each topic to serve as starting points for further discussion and analysis leading eventually to finalizing the process by which DOE will accept spent fuel and waste into its waste management system. The eight reports are concerned with the conditions under which spent fuel and high level waste will be accepted in the following categories: failed fuel; consolidated fuel and associated structural parts; non-fuel-assembly hardware; fuel in metal storage casks; fuel in multi-element sealed canisters; inspection and testing requirements for wastes; canister criteria; spent fuel selection for delivery; and defense and commercial high-level waste packages. This document discusses acceptance of failed spent fuel assemblies by the Federal Waste Management System. 18 refs., 7 figs., 25 tabs

  17. Development of comprehensive care system for children with autism syndrome disorders in Russia: one project experience

    Directory of Open Access Journals (Sweden)

    Alekhina S.V.

    2016-12-01

    Full Text Available Attention to the issue of children with ASD in our country is growing steadily. Since the release of the new Law «About the education in Russian Federation», where for the first time this category of children was secured by state guarantees, all normative acts and basic solutions are focused on the development of comprehensive care for children with ASD and their families. Official initiatives are in many ways supported with the activity of community organizations and parental associations, representing the interests of families. Experience of many years becomes the basis for efficient solutions and social problems analysis of the identification, education and support of people with autism. Also it becomes platform for social and psychological support of their families. Currently, in the Russian Federation, domestic model for providing comprehensive medical and social, psychological and educational assistance for children with autism just begin to develop. However, the policy, conducted by the government for individuals with disabilities, including children with ASD, confirms state structures readiness to take the main measures of comprehensive rehabilitation and habilitation. The article describes the experience of creating integrated care systems for children with ASD in Russia. The example of project real¬ization involving three of the Russian Federation states, which is aimed at ensuring high quality of life of children, is shown

  18. 76 FR 11415 - Federal Motor Vehicle Safety Standards; Power-Operated Window, Partition, and Roof Panel Systems

    Science.gov (United States)

    2011-03-02

    ... [Docket No. NHTSA-2011-0027] RIN 2127-AK52 Federal Motor Vehicle Safety Standards; Power-Operated Window, Partition, and Roof Panel Systems AGENCY: National Highway Traffic Safety Administration (NHTSA), Department... automatic reversal systems (ARS) for power windows and to make a final decision. The agency has decided not...

  19. The adolescent family life program: a multisite evaluation of federally funded projects serving pregnant and parenting adolescents.

    Science.gov (United States)

    Kan, Marni L; Ashley, Olivia Silber; LeTourneau, Kathryn L; Williams, Julia Cassie; Jones, Sarah B; Hampton, Joel; Scott, Alicia Richmond

    2012-10-01

    We evaluated the effectiveness of care demonstration projects supported by the Title XX Adolescent Family Life (AFL) program, which serves pregnant and parenting adolescents in an effort to mitigate the risks associated with adolescent childbearing. This cross-site evaluation involved 12 projects and 1038 adolescents who received either enhanced services funded by the AFL program or usual care. We examined the effects of enhanced services on health, educational, and child care outcomes approximately 6 months to 2 years after intake and explored moderation of program effects by time since intake and project characteristics associated with outcomes. The odds of using long-acting reversible contraception (odds ratio [OR] = 1.58) and receiving regular child care (OR = 1.50) in the past month were higher in the intervention group than in the comparison group. Odds of a repeat pregnancy were lower (OR = 0.39) among intervention group adolescents than among comparison group adolescents within 12 months of intake. Several project characteristics were associated with adolescent health outcomes. These projects show promise in improving effective contraceptive use, increasing routine child care, and yielding short-term decreases in repeat pregnancy.

  20. The fuel cycle of the LWR system in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Spalthoff, F.J.; Messer, K.P.

    1977-01-01

    Within the framework of a system analysis conducted to forecast the nuclear output capacity that would presumably be installed by the year 2000 in the Federal Republic of Germany, the demands for uranium, enrichment and reprocessing, the fuel fabrication of elements and transportation capacity are determined. The factors of uncertainty involved in forecasts concerning the demand are discussed (analysis of sensitivity). Furthermore, the study points out to what extent the demand for uranium and fuel cycle services is being covered in the FRG and what aspects related to the coverage not yet secured are important. The situation in the field of reprocessing and ultimate disposal in the FRG, and the role which the electrical utilities are to play are in particular dealt with. After a brief survey of the Federal Republic's plans concerning the reprocessing and ultimate disposal issues, the pending problems related to the technology, organization and financing of this sector of the fuel cycle are analyzed. Moreover, the paper deals with the past and probable future development of fuel cycle costs as well as with their influence on the further development of nuclear energy as a whole. It will be examined whether and to what extent the considerable increase in the costs for uranium, enrichment and reprocessing occurring simultaneously with the rise of capital expense for new nuclear power plants has affected the profitability of nuclear energy as compared with fossil primary energies. Finally, the paper discusses how the security of supply for nuclear power plants with fuel and all necessary services could be improved under economically justifiable conditions, and what measures could be taken in this area by the electric utilities, the fuel cycle industries, and the public authorities