WorldWideScience

Sample records for projected budget deficit

  1. Budget Deficits Effects on Economic Growth

    Directory of Open Access Journals (Sweden)

    L.C.Risti

    2013-06-01

    Full Text Available The budget deficit can not be analyzed autarchically, as it affects all the macroeconomic processes and, is itself influenced by all other macroeconomic indicators. Most analyses and studies on public finance and budget balance measure the impact that budgetary deficits accumulation has on economy. Therefore, the present paper aims at following and analyzing the mutual impact between budget deficit and another economic macro indicator, namely the economic growth.

  2. Analysis of Budget deficit in Romania during 2000-2013

    OpenAIRE

    Moraru Camelia; Popovici Norina

    2014-01-01

    Worldwide, over time, the years of economic crisis were defined by significant increases in the levels of budget deficits. Discussions on sizing budget deficits, financing, especially the volume of public debt became more intense, both politically and academically. The impact of budget deficit on economic growth is a common theme found in the economic policies adopted. The present paper aims to analyze the evolution of budget deficit and the structural budget deficit in Romania during 2000-20...

  3. ANALYSIS OF BUDGET DEFICIT AND ITS PROBLEMS IN LITHUANIA

    Directory of Open Access Journals (Sweden)

    F. Jaseviciene

    2015-10-01

    Full Text Available Budget deficit is one of the most important parts of macroeconomics. Since 1990, the government of the Lithuanian Republic has been faced with problems in balancing the budget deficit; most of the years, the country’s budget was deficit with the lack of incoming money flow. The budget deficit value in Lithuania has been a significant theme since 2004, when Lithuania became part of the European Union, and one of the liabilities was to insure the litas replacement with euro currency and the budget deficit was one of the Maastricht’s criteria. Also it is very important to maintain effective management of public finances. The government is responsible for managing the country’s budget in respect to various economical parameters, for example, GDP, inflation rate, unemployment rate, etc., in order to plan income level and distribute it to the relevant economic areas. Also, the budget deficit’s problems are revealed in this article.

  4. Teaching the Federal Budget, National Debt, and Budget Deficit: Findings from High School Teachers

    Science.gov (United States)

    Marri, Anand R.; Ahn, Meesuk; Crocco, Margaret Smith; Grolnick, Maureen; Gaudelli, William; Walker, Erica N.

    2011-01-01

    The issues surrounding the federal budget, national debt, and budget deficit are complex, but not beyond the reach of young students. This study finds scant treatment of the federal budget, national debt, and budget deficit in high schools today. It is hardly surprising that high school teachers spend so little time discussing these topics in…

  5. Impact of Budget Deficit on Inflation in Zimbabwe

    OpenAIRE

    Albert Makochekanwa

    2011-01-01

    The Zimbabwean economy is one of the countries that once experienced a relatively high fiscal deficit for a prolonged period which resulted in a hyper inflationary environment. This paper examines the deficit-inflation nexus in the Zimbabwean economy and establishes the causal link that runs from the budget deficit to the inflation rate using Johansen (1991, 1995) cointegration technique over the period 1980 to 2005. Due to massive monetization of the budget deficit, significant inflationary ...

  6. EVOLUTION OF APPROACHES TO FINANCE THE BUDGET DEFICIT

    Directory of Open Access Journals (Sweden)

    K. Cherkashyna

    2014-12-01

    Full Text Available In the article, the causes and existence of the state budget deficit are defined. The main source of budget deficit financing in historical retrospective are considered. The most popular government securities which issued in foreign countries are compared in the article. The dynamics of the budget deficit in Ukraine and the sources of its coverage are analyzed in the article. There are three main types of government securities in Ukraine, such as: national currency-denominated government bonds, foreign currency-denominated government bonds and target government bonds. The main market maker of the government bonds' market is National Bank of Ukraine. The volume of resources, which are mobilized from the issue of the national currency-denominated government bonds are major then the volume of resources, which are mobilized from the issue of the foreign currency-denominated government bonds The necessity of further improvement of government securities as an important source of budget deficit financing is emphasized.

  7. Macroeconomic Factors Affecting Budget Deficit in Pakistan: A Time Series Analysis

    Directory of Open Access Journals (Sweden)

    Ayesha Mushtaq

    2013-10-01

    Full Text Available The objective of the study is to empirically investigate the relationship between budget deficit and macroeconomic factors i.e., financial development indicator, economic growth, changes in price level and real exchange rate, by using data from1980-2011 for Pakistan. The results reveal that there is a positive and significant relationship between real effective exchange rate and budget deficit on one hand, while economic growth and financial development indicator with reference to budget deficit on the other hand. Changes in price level have a significant and negative relationship with the budget deficit in Pakistan.

  8. Budget deficit, money growth and inflation: Empirical evidence from Vietnam

    OpenAIRE

    Khieu Van, Hoang

    2014-01-01

    This study empirically examines the nexus among budget deficit, money supply and inflation by using a monthly data set from January 1995 to December 2012 and a SVAR model with five endogenous variables, inflation, money growth, budget deficit growth, real GDP growth and interest rate. Since real GDP and budget deficit are unavailable on the monthly basis, we interpolate those series using Chow and Lin’s (1971) annualized approach from their annual series. Overall, we found that money growth h...

  9. The impact of a budget deficit on inflation in Zimbabwe

    OpenAIRE

    Makochekanwa, Albert

    2008-01-01

    The Zimbabwean economy is one of the many numbers of countries that has experienced a relatively high fiscal deficit for a prolonged period with the result of a high inflationary environment. This paper examines the deficit-inflation nexus in the Zimbabwean economy and establishes the causal link that runs from the budget deficit to the inflation rate using Johansen (1991, 1995) cointegration technique over the period 1980 – 2005. Due to massive monetization of the budget deficit, significant...

  10. Analysis of Budget Deficits and Macroeconomic Fundamentals: A VAR-VECM Approach

    Directory of Open Access Journals (Sweden)

    Manamba Epaphra

    2017-10-01

    Full Text Available Aim/purpose - This paper examines the relationship between budget deficits and selected macroeconomic variables in Tanzania for the period spanning from 1966 to 2015. Design/methodology/approach - The paper uses Vector autoregression (VAR - Vector Error Correction Model (VECM and variance decomposition techniques. The Johansen's test is applied to examine the long run relationship among the variables under study. Findings - The Johansen's test of cointegration indicates that the variables are cointegrated and thus have a long run relationship. The results based on the VAR-VECM estimation show that real GDP and exchange rate have a negative and significant relationship with budget deficit whereas inflation, money supply and lending interest rate have a positive one. Variance decomposition results show that variances in the budget deficits are mostly explained by the real GDP, followed by inflation and real exchange rate. Research implications/limitations - Results are very indicative, but highlight the importance of containing inflation and money supply to check their effects on budget deficits over the short run and long-run periods. Also, policy recommendation calls for fiscal authorities in Tanzania to adopt efficient and effective methods of tax collection and public sector spending. Originality/value/contribution - Tanzania has been experiencing budget deficit since the 1970s and that this budget deficit has been blamed for high indebtedness, inflation and poor investment and growth. The paper contributes to the empirical debate on the causal relationship between budget deficits and macroeconomic variables by employing VAR-VECM and variance decomposition approaches.

  11. The impact of budget deficit on the economic development of Romania

    OpenAIRE

    Mesea, Oana Elena

    2012-01-01

    This paper empirically analyzes the impact of budget deficit on the economic development of Romania. Using the OLS estimates for quarterly series for the period from 2001 to 2011, the results of the estimates prove that there is an indirect relationship between budget deficit and economic growth of Romania. According to the best statistically significant model from the three different model tested, we reached the result that one percent rise of budget deficit gives a 1.36 percent fall in real...

  12. Inflationary effects of budget deficit financing in contemporary economies

    OpenAIRE

    Angela Boariu; Irina Bilan

    2007-01-01

    This paper tries to analyse the relations existing between the different ways of financing budget deficit and inflation, underlining the terms of these relations and the involved social and economic effects. An important source of inflation is considered to be the financing of budget deficits by direct appeal to the central bank's resources, nowadays forbidden by law in most countries for its negative impact. Nevertheless, inflation can also appear as a consequence of debt financing of the bu...

  13. Analyzing Content about the Federal Budget, National Debt, and Budget Deficit in High School and College-Level Economics Textbooks

    Science.gov (United States)

    Marri, Anand R.; Gaudelli, William; Cohen, Aviv; Siegel, Brad; Wylie, Scott; Crocco, Margaret S.; Grolnick, Maureen

    2012-01-01

    This study sought to identify content on the federal budget, national debt, and budget deficit in the 12 most commonly used high school and college-level economics textbooks. Our systematic review of these sources leads to two key findings: (1) Textbooks are similar in how they represent fiscal policy yet treat the federal budget, deficit, and…

  14. Impacts of budget deficit on output, inflation and balance of trade

    NARCIS (Netherlands)

    Wakeel, Iftkhar; Ullah, Kafait

    2013-01-01

    This paper tries to analyze the impacts of budget deficit on macroeconomic aspects of Pakistan. In fact the ways through which budget deficit is financed, can affect money supply, output, exchange rate and then foreign trade. Annual data for the period 1970-2010 has been taken for analysis. ADF test

  15. The Budget Deficit in the System of the Financial and Credit Development of Economy

    Directory of Open Access Journals (Sweden)

    Kucher Galyna V.

    2017-11-01

    Full Text Available Scientific approaches to the role, influence and peculiarities of usage of budget deficit as an instrument for ensuring social development both in Ukraine and in the EU countries have been disclosed. Influence of certain types of budget deficit on the economic system has been explained and expediency of considering the fluctuations of exchange rate, along with conditions of attraction of credit resources for definition of the operational budget deficit, has been substantiated. The practical results include the analysis of budget deficit indicators in Ukraine and in the EU countries, as well as the factors that determined their change. Both the national and the international experience, cyclical economic development, crisis events in the economy have demonstrated that the budget deficit is an important instrument of financial policy. Its usage helps to reduce the negative impact and to ensure a way out of the economic crisis. The budget deficit is an effective lever for macroeconomic management, which should be actively used to accelerate economic growth in the developing countries in the context of globalization.

  16. State Sukuk Potential in Reducing Indonesia Budget Deficit, 2009-2015

    Directory of Open Access Journals (Sweden)

    Ima Amaliah

    2017-06-01

    Full Text Available The purpose of this study is to identify potential retail state sukuk as part of state bonds that are used to replace foreign debt and lower the government's budget deficit. This study is important because the government's budget deficit continues to rise each year due to the increase of foreign debt. The increase in the debt itself is closely related to exchange rate fluctuations. Therefore, it is important for the government to develop a relatively secure funding in facing exchange rate fluctuations as well as parts of interest rate. The government has developed state securities based on sharia (SBSN which can be used not only to close finance deficit but also to alternatively finance the infrastructure development. The population consists of budget deficit, retail state sukuk, corporate sukuk, and foreign debt. It uses purposive sampling to get the sample during 2009 -2015. This research uses descriptive quantitative method of secondary data published by Bank Indonesia, ministry Finance and Jakarta Islamic Index. The result shows that the proportion of retail state sukuk against sharia state securities increases over time (over 50% but the proportion of corporate sukuk numbers is still relatively small (below 25%.

  17. Budget deficits, monetization, and central-bank independence in developing countries

    NARCIS (Netherlands)

    Sikken, BJ; de Haan, J

    Using various indicators for central bank independence we examine the relationship between central bank independence and government budget deficits. Using a two-stage procedure we also analyze whether central bank independence affects the monetization of deficits. First, the monetization relation in

  18. Analysis & commentary. Health care reform is likely to widen federal budget deficits, not reduce them.

    Science.gov (United States)

    Holtz-Eakin, Douglas; Ramlet, Michael J

    2010-06-01

    The federal government faces a daunting fiscal outlook, which makes the budgetary impact of the Patient Protection and Affordable Care Act even more important. The official Congressional Budget Office (CBO) analysis indicates modest deficit reduction over the next ten years and beyond. We examine the underpinnings of the CBO's projection and conclude that it is built on a shaky foundation of omitted costs, premiums shifted from other entitlements, and politically dubious spending cuts and revenue increases. A more comprehensive and realistic projection suggests that the new reform law will raise the deficit by more than $500 billion during the first ten years and by nearly $1.5 trillion in the following decade.

  19. The impact of the budget deficit on the currency and inflation in the transition economies

    OpenAIRE

    Petraq Milo

    2012-01-01

    This article investigates the causal linkage between budget deficit, monetary mass and inflation in the transition economies. It is focused on the impact of public expenditures growth on money supply growth, and it does not take in account the amount of budget deficit. We test the new hypothesis that inflation is primarily attributable to public finances imbalances. In our model, the money supply growth is function of budget deficit and GDP growth rate; and inflation is a function of money su...

  20. The Deficit and the Federal Budget. 1983 National Issues Forum.

    Science.gov (United States)

    Melville, Keith, Ed.

    Although designed for participants in the National Issues Forum, this booklet, which describes the impact of the federal deficit and the federal budget process, is also useful for secondary school social studies. The six sections begin with an introduction describing why the deficit grows yearly and why it is difficult for Congress to stop its…

  1. Consequences of the Budget Deficit in the Current Crisis in Romania. Implications on the Labor Market

    Directory of Open Access Journals (Sweden)

    Gabriela MOLĂNESCU

    2011-02-01

    Full Text Available In the current economic activity conditions, in which the need of financial resources is usually higher than the existing funds, the elaborations of budgets at any level is one of the primary issues, particularly as regards the principle of budgetary balance. Approaches regarding sizing budgets deficits, means of financing and particularly sizing public debt get a series of touches of precise nature for different economies. Actual economic, financial, social and administrative conditions put up a series of problems which impose an extremely serious approach of the potential adverse impact by sizing of budget deficits and public debt over the real possibilities of noninflationary financing. In Romania, in the highly complex framework in which the economic activity takes place, in the attempt to show the place held by the budget deficit, a special role is assigned to determine the share of public financial deficit in the consolidated budget revenue and expenditure. Currently, knowledge and concern for reducing the budget deficit are still of great importance, especially as Romania is facing great difficulties in economic development. Amid deepening structural crisis phenomena, increasing budget deficits financed over a non-inflationary limits comes as an additional factor that contributes to imbalances of the economy. In addition, where budgetary expenditures are targeted to satisfy, primary, the redistribution function and to state subsidies, because of the lack of a real multiplier coefficient, the state budget deficit worsens. Influences such as introducing economic disturbance in the mechanisms which cause them to increase budget deficits can be summarized and grouped into two broad categories: economic influences and psychological influences. Regarding economic influences, we can say that they act strongly and strictly determined by how meanings used to cover budget deficit. The modalities used are subject to an analysis by direct or indirect

  2. ANALYSIS OF BUDGET DEFICIT IN THE CANDIDATE COUNTRIES FOR EU MEMBERSHIP

    Directory of Open Access Journals (Sweden)

    Danijela Despotović

    2017-11-01

    Full Text Available The problems of deficit and debt are the traditional drivers of the recession in the past. Due to the high impact of the budget deficit to increase in indebtedness and deterioration of a macroeconomic performance, the European Union in Maastricht Treaty and later in the Pact of Stability and Growth strictly defined fiscal criteria which the member states should adhere to. Fiscal criteria are particularly important when it comes to candidate countries for EU membership. The aim of this paper is that, through theoretical and empirical basis perform a comparative analysis of the budget deficit in EU countries and candidates for membership in the EU, to rank the 34 countries according to the criteria of public finances and to show the causality between the candidate countries for membership of the EU and EU member states.

  3. Innovative Management of Budget Deficits: A Proportional Salary and Time Reduction Scheme.

    Science.gov (United States)

    Sloper, David

    1989-01-01

    An approach to institutional budgeting designed to alleviate accumulated deficits is described. The proposal introduces flexibility into the salary component, alleviating cash flow difficulties in the short to medium term and encouraging more proactive budgeting, by allowing employees to contract for reduced annual salary in exchange for reduced…

  4. A Note on Interest Rates and Structural Federal Budget Deficits

    OpenAIRE

    Kitchen, John

    2002-01-01

    This paper provides evidence on the response of interest rates to Federal budget deficits. A simple model is presented that incorporates the role of monetary policy in the determination of short-run interest rates and that ascribes the effects of government budget imbalances on the term structure of interest rates to uncertainty about the expected evolution of inflation and real interest rates. Empirical results support the view that the term structure of interest rates is affected by Fede...

  5. 40 CFR 45.140 - Budget and project period.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Budget and project period. 45.140 Section 45.140 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRAINING ASSISTANCE § 45.140 Budget and project period. The budget and project periods for...

  6. Implications of Water Budget Deficits on Socio-Economic Stability and Food Security in the Arabian Peninsula and in North Africa

    Science.gov (United States)

    Mazzoni, A.; Heggy, E.; Scabbia, G.

    2017-12-01

    Water scarcity in the Arabian Peninsula and North Africa is accentuated by forecasted climatic variability, decreasing precipitation volumes and projected population growth, urbanization and economic development, increasing water demand. These factors impose uncertainties on food security and socio-economic stability in the region. We develop a water-budget model combining hydrologic, climatic and economic data to quantify water deficit volumes and groundwater depletion rates for the main aquifer systems in the area, taking into account three different climatic scenarios, and calculated from the precipitation forecast elaborated in the CSIRO, ECHAM4 and HADCM3 global circulation models from 2016 to 2050 over 1-year intervals. Water demand comprises water requirements for each economic sector, derived from data such as population, GDP, cropland cover and electricity production, and is based upon the five different SSPs. Conventional and non-conventional water resource supply data are retrieved from FAO Aquastat and institutional databases. Our results suggest that in the next 35 years, in North Africa, only Egypt and Libya will exhibit severe water deficits with respectively 44% and 89.7% of their current water budgets by 2050 (SSP2-AVG climatic scenario), while all the countries in the Arabian Peninsula will be subjected to water stress; the majority of small-size aquifers in the Arabian Peninsula will reach full depletion by 2050. In North Africa, the fossil aquifers' volume loss will be 1-15% by 2050, and total depletion within 200-300 years. Our study suggests that (1) anthropogenic drivers on water resources are harsher than projected climatic variability; (2) the estimated water deficit will induce substantial rise in domestic food production's costs, causing higher dependency on food imports; and (3) projected water deficits will most strongly impact the nations with the lowest GDPP, namely Egypt, Yemen and Libya.

  7. Balanced Budget Rules and Public Deficits: Evidence from the U.S. States

    OpenAIRE

    Henning Bohn; Robert P. Inman

    1996-01-01

    Most states (Vermont is the exception) have a constitutional or statutory limitation restricting their ability to run deficits in the state's general fund. Balanced budget limitations may be either prospective or beginning-of-the-year requirements or retrospective or end-of-the-year requirements. Using budget data from a panel of 47 U.S. states for the period 1970-1991, the analysis finds that states with end-of-the-year (not prospective) balance requirements enforced as constitutional (not s...

  8. France, Germany, Greece and the United Kingdom an analysis and comparison of budget deficits and defense spending

    OpenAIRE

    Schoettelndreyer, Friedrich.

    2011-01-01

    Approved for public release; distribution is unlimited. This thesis documents findings on the relationship of government budget deficits and defense spending for France, Germany, Greece, and the United Kingdom in detail and for NATO and OECD country collectives. The thesis topic is relevant, as many European countries are justifying their recent cuts in defense spending with high government budget deficits. The author looked at different data sources and metrics to graphically analyze the ...

  9. Influence Of Budget Deficit On Economic Growth: The Case Of The Republic Of Macedonia

    OpenAIRE

    Nikoloski, Aleksandar; Nedanovski, Pece

    2017-01-01

    Having a balanced budget is very important for achieving long-term and stable economic growth in everyone country.Namely, the budget itself is a very powerful and useful tool and instrument for defining and realizing development policies in acountry. The usefulness and the efficiency of this instrument largely depend on whether it is balanced or in deficit. Structural budgetdeficit cannot be analyzed if abstracted and separated because it influences large number of macroeconomic trends, but i...

  10. A Note on Federal Budget Deficits and the Term Structure of Real Interest Rates in the United States

    OpenAIRE

    Cebula, Richard

    1990-01-01

    Using quarterly data and dealing with the ex post real rates on three month U.S. Treasury bills and 20 year U.S. Treasury bonds, this empirical note has estimated an IS-LM based regression by 2SLS. The results indicate that the budget deficit raises the slope of the yield curve. Furthermore, to the extent that private sector capital formation is sensitive to longer term real interest rates in the United States, federal budget deficits lead to crowding out of private investment and hence to sl...

  11. Testing the macroeconomic impact of the budget deficit in EU Member States using linear regression with fixed effects

    Directory of Open Access Journals (Sweden)

    Dalian Marius DORAN

    2017-11-01

    Full Text Available The article aims to research impact of budget balance, whether surplus or deficit, on the main indicator characterizing the economic growth of a country, namely GDP and the inflation rate in the 27 European Union Member States and the United Kingdom. For this analysis was used panel data, taking into account the period from 2001 to 2015. The method used for the analysis is the linear regression with fixed effects and with Driscoll-Kraay standard errors. The dependent variables are the growth rate of real GDP and the inflation rate, and the independent variable is the budget balance (surplus or deficit. The results obtained after using econometric software Stata shows a positive impact of budget balance on growth in the European Union for the analyzed period.

  12. Reducing the Deficit: Spending and Revenue Options

    Science.gov (United States)

    1994-03-01

    357 B SPENDING OPTIONS BY BUDGET FUNCION ...... 363 TABLES 1. Baseline Deficit Projections, Fiscal Years 1993-2004...direct control of the Congress. abled beneficiaries and beneficiaries with end-stage renal disease. Nonhealth changes enacted in The total that is

  13. Saudi Arabia: persistent but tenable deficits

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    In this article is described the economic situation of Saudi Arabia. In a first time, Saudi Arabia drew from external reserves to finance gulf war and covered its budget deficits, then the internal debts took over. The actual strategy in order to transfer from state to private national and foreign sector a great part of new projects financing is become a necessity to control the deficits in a country where state is strongly got in debt. (N.C.). 2 tabs

  14. The Budget Deficit--The "Crisis" of the 80's. Series on Public Issues No. 13.

    Science.gov (United States)

    Greenhut, Melvin L.; Smithson, Charles W.

    In this booklet, one of a series intended to apply economic principles to major social and political issues of the day, an analogy is drawn between the dire predictions once made about the energy crisis and those now being made about a budget crisis. Concerns about the deficit have centered on inflation, interest rates, and growth of the economy.…

  15. Proposed State Budget Improves Outlook for Kids, but Leaves Much Work to Be Done

    Science.gov (United States)

    Children Now, 2013

    2013-01-01

    For the first time in many years, the Administration's proposed state budget does not project a deficit. Painful budget cutting in recent years combined with voters passing Proposition 30 in November to generate revenues finally have put California on more stable fiscal ground. However, it is critical to recognize that kids have borne a…

  16. The deficit of current account balances and budgetary deficit in countries in transition

    OpenAIRE

    Sandra Krtalic; Ines Kersan

    1998-01-01

    In restructuring process of their own economies, countries in transition deal with many common problems. One of the problems that transition brought to those countries is deficit in current account, as well as budget deficit. Deficits represent limit to a healthy and fast economic development and progress. Balance in balance of payments, as well as balanced budget are components of macroeconomic system. The authors will give an review of activities on deficits in countries in transition, and ...

  17. Do Budget Deficits Reduce Household Taxpayer Compliance? Preliminary Evidence Using the Feige Data

    OpenAIRE

    Cebula, Richard; Toma, Michael

    2004-01-01

    This study investigates the hypothesis that higher federal budget deficits act to increase the degree of federal personal income tax evasion in the U.S. Using annual data on aggregate personal income tax evasion for the period 1961-1997, 1997 being the most recent year for which all of the needed data are currently available, and allowing for such factors as income tax rates, IRS tax return audit rates, the Vietnam War, and the Watergate scandal, it is found that income tax evasion is an incr...

  18. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  19. FY2011 Budget Proposals and Projections

    Science.gov (United States)

    2010-03-29

    and FY2009, and corporate income tax receipts fell even more sharply. Federal deficits, according to OMB and CBO projections, will likely be high...gains receipts can be especially sensitive to cyclical economic conditions. Asset values and corporate profits—and thus federal corporate income tax and

  20. Soil nutrient budgets following projected corn stover harvest for biofuel production in the conterminous United States

    Science.gov (United States)

    Tan, Zhengxi; Liu, Shuguang

    2015-01-01

    Increasing demand for food and biofuel feedstocks may substantially affect soil nutrient budgets, especially in the United States where there is great potential for corn (Zea mays L) stover as a biofuel feedstock. This study was designed to evaluate impacts of projected stover harvest scenarios on budgets of soil nitrogen (N), phosphorus (P), and potassium (K) currently and in the future across the conterminous United States. The required and removed N, P, and K amounts under each scenario were estimated on the basis of both their average contents in grain and stover and from an empirical model. Our analyses indicate a small depletion of soil N (−4 ± 35 kg ha−1) and K (−6 ± 36 kg ha−1) and a moderate surplus of P (37 ± 21 kg ha−1) currently on the national average, but with a noticeable variation from state to state. After harvesting both grain and projected stover, the deficits of soil N, P, and K were estimated at 114–127, 26–27, and 36–53 kg ha−1 yr−1, respectively, in 2006–2010; 131–173, 29–32, and 41–96 kg ha−1 yr−1, respectively, in 2020; and 161–207, 35–39, and 51–111 kg ha−1 yr−1, respectively, in 2050. This study indicates that the harvestable stover amount derived from the minimum stover requirement for maintaining soil organic carbon level scenarios under current fertilization rates can be sustainable for soil nutrient supply and corn production at present, but the deficit of P and K at the national scale would become larger in the future.

  1. Budget institutions and taxation

    DEFF Research Database (Denmark)

    Aaskoven, Lasse

    2018-01-01

    While a number of different studies have explored the effects of budgetary procedures and the centralization of the budget process on government debt, deficits and spending, few of them have explored whether such fiscal institutions matter for public revenue. This article argues that centralizing...... the budget process raises the levels of taxation by limiting the ability of individual government officials to veto tax increases in line with common-pool-problem arguments regarding public finances. Using detailed data on budgetary procedures from 15 EU countries, the empirical analysis shows that greater...... centralization of the budget process increases taxation as a share of GDP and that both the type of budget centralization and level of government fractionalization matter for the size of this effect. The results suggest that further centralizing the budget process limits government debt and deficits...

  2. The reason why the budget for the Yucca mountain project is cut

    International Nuclear Information System (INIS)

    Wang Ju

    2010-01-01

    This paper introduces the event that the 2009 and 2010 budgets for the Yucca Mountain Spent Fuel Disposal Project is cut. The political, ethnical, technical, economical and resource recycling reasons for the budget cutting are analyzed. It is proposed that the strong objection of Senator Harry Reid and the political consideration are the main reasons for budget cutting. Many objections on the budget cutting are also introduced. (authors)

  3. Ricardian Equivalence, Twin Deficits, and the Feldstein-Horioka puzzle in Egypt

    OpenAIRE

    Carlos Marinheiro

    2006-01-01

    Egypt has presented important budget imbalances. This paper tries to evaluate whether Egypt’s public deficit has had any impact on current account imbalances, examining the validity of the twin deficit hypothesis for Egypt. We conclude for the presence of a (weak) long-run relationship between the budget deficit and the current account deficit. Yet, we reject the twin-deficit hypothesis: we found evidence in favour of a reverse Granger-causality running from the external deficit to the budget...

  4. Budget deficit remedies and their impact on the non-oil sectors of an oil-exporting country: the case of Kuwait

    International Nuclear Information System (INIS)

    Eltony, M.N.

    1998-01-01

    A model for the non-oil production side of the Kuwaiti economy was developed and estimated. The model, then, was simulated according to various scenarios designed to eliminate the budget deficit by the year 2000, in order to examine the effect on the non-oil sector of the economy. The results indicate that, in terms of its impact on non-oil GDP, the extreme case scenario is harsh, bringing down the level of non-oil GDP by more than 20% by the year 2000 from its level in 1993. The impact on the budget deficit may be very positive, but non-oil production and consumption will decline very rapidly, creating widespread hardship across all economic sectors. The results suggest a better option lies in adopting either of two intermediate case scenarios. While each of these will also cause a decline in non-oil GDP, it will not be to the extent caused by the extreme case scenario

  5. Statistical – Econometric Analysis of the Correlations between the Social Security Budget and the Main Macroeconomic Aggregates in Romania

    Directory of Open Access Journals (Sweden)

    Emilia ŢIŢAN

    2011-02-01

    Full Text Available This paper analyses the correlation between social security budget and the main macroeconomic indicators (like GDP, monthly average gross earnings, unemployment in Romania during the period 2000 – 2009. Romania faces a more severe economic recession than originally anticipated. Although the implementation of anti-crisis program was able to lead to normalization of financial conditions, the contraction of economic activity is higher than initial projections. Because of the great policy debate in Romania about the impact of the reduction of pensions and salaries and increases of taxations on the reduction of budget deficit, we have explained in our paper the basic sides of the balanced budget debate. There are three basic sides to the balanced budget debate. The traditionalists argue for a reduction of the budget deficit since it harms the economy. Another group holds the Ricardian view of government debt in believing that there is no real harm done to the economy by the national debt. A third group claims one way or another that the budget deficit is not an adequate measure of fiscal policy. We will argue which of these views is most reasonable, based on a study case. The study is based on official data published by the National Institute of Statistics, with the specification that they are transformed into real values in order to assure the data comparability. The methodology used is the correlation analysis, the factorial analysis and the regression analysis, in order to evaluate the impact of some macroeconomic policies on the budget deficit. Three hypotheses on macroeconomic policies are discussed in the paper and their influences on the budget deficit. The main problem in Romania was that the macroeconomic policies didn't give enough attention to budget deficit in order to keep it under control. This is the main cause of the actual unfavourable economical situation in Romania, with a huge budget deficit, with a decrease in economic activity

  6. BUDGET AND PUBLIC DEBT

    Directory of Open Access Journals (Sweden)

    Morar Ioan Dan

    2014-12-01

    Full Text Available The issue of public budgeting is an important issue for public policy of the state, for the simple reason that no money from the state budget can not promote public policy. Budgetary policy is official government Doctrine vision mirror and also represents a starting point for other public policies, which in turn are financed by the public budget. Fiscal policy instruments at its disposal handles the public sector in its structure, and the private sector. Tools such as grant, budgetary allocation, tax, welfare under various forms, direct investments and not least the state aid is used by the state through their budgetary policies to directly and indirectly infuence sector, and the private. Fiscal policies can be grouped according to the structure of the public sector in these components, namely fiscal policy, budgeting and resource allocation policies for financing the budget deficit. An important issue is the financing of the budget deficit budgetary policies. There are two funding possibilities, namely, the higher taxes or more axles site and enter the second call to public loans. Both options involve extra effort from taxpayers in the current fiscal year when they pay higher taxes or a future period when public loans will be repaid. We know that by virtue of "fiscal pact" structural deficits of the member countries of the EU are limited by the European Commission, according to the macro structural stability and budget of each Member State. This problem tempers to some extent the governments of the Member States budgetary appetite, but does not solve the problem of chronic budget deficits. Another issue addressed in this paper is related to the public debt, the absolute amount of its relative level of public datoriri, about the size of GDP, public debt financing and its repayment sources. Sources of public debt issuance and monetary impact on the budget and monetary stability are variables that must underpin the justification of budgetary

  7. Developing integrated parametric planning models for budgeting and managing complex projects

    Science.gov (United States)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  8. The Impact of the Federal Budget Deficit on Student Aid Funding.

    Science.gov (United States)

    Frances, Carol; Harrison, Jim

    1993-01-01

    This newsletter discusses factors that shape federal education funding policies. It examines the size of the federal deficit and its progress, as well as the factors affecting the resources available for education. The 1993 interest on the federal debt is projected to be $314 billion and payments such as these have held down funding for student…

  9. The Impact of External Public Audit on the Budget Deficit

    Directory of Open Access Journals (Sweden)

    Alexandra Vasile

    2014-05-01

    Full Text Available Objectives: Public imbalances can cause extensive problems both on public finances and economy. Regardless of the constitution and destination of funds it is absolutely necessary to verify their correct accounting, collection type and expense in accordance with applicable regulations, and if due attention is paid to obtain an optimal balance between resources and results. Therefore it is useful to study the role of public audit in the formation and use of public funds to indicate its impact on the budget balance. Prior Work: This paper presents the evolution of synthetic budgetary indicators during 2010 - 2013 and the impact that the external public audit had on the budget deficit. Approach: In order to highlight the importance and necessity of public audit activity it has been analyzed its influence in the formation and use of public funds and the extent of implementation of the recommendations made in the audit reports. Results: In the study conducted we have set out several conclusions regarding definite reality according to which financial resources materialize a large part of GDP, so that advocates for public performance of the audit. Implications: The need for public audit can be viewed through the prism of the three classes of economic and financial interests, namely: the interests of public entities, third party interests of consumers of public goods and services and state interests. Value: This paper highlights the importance and the impact of public external audit activity on public financial funds and invites the interested readers on the topic to get involved by providing feedback in order to improve this activity in Romania.

  10. CONFIGURATION OF THE BUDGET IN THE “VILLA THEONELIS AGROTOURISM” STRUCTURAL FUNDS INVESTMENT PROJECT

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2013-11-01

    Full Text Available In order to anticipate the future of an investment project, we must understand the past and present of an enterprise. The income and expenses budget in an investment project, is drafted based on the enterprise’s historical data, carrying out all the profitability calculations on existing cash flows, supporting an anticipation, a full forecast of all the elements targeting the future investment project. The budget is an operational plan, a planning and control tool, based on knowledge. The financial projections are aimed at three or five years timeframes and they include the company’s revenue and expenditure forecasting, taking into account the need for capital coming from the company’s own sources, additional capital needs and the financing methods, based on professional judgment that scientifically calculates the expected efficiency. The procedure for having an investment project approved implies the existence of a typical documentation, involving, besides the financing request, the drafting of an income and expenses budget, for a 3 to 5 years timeframe.

  11. Consequences of fiscal deficit and public debt in financing the public sector

    Directory of Open Access Journals (Sweden)

    Tešić Aleksandra

    2014-01-01

    Full Text Available The aim of this paper is to highlight the important issues of the budget deficit and public debt and their impact on economic growth. This paper considers the twin deficit hypothesis, which argues that there is a strong correlation between the current account deficit for an economy and government budget deficits. In the last ten years, Serbia is faced with a situation of simultaneous fiscal deficit and current account deficit. However, the growth of gross domestic product and the maturity of the debt obligation indicate that the debt burden increases, the weak development of the economy and the debt, and the power of the state and threatened to open debt crisis, the emergence of foreign insolvency. To explore the effects of budget deficits and public debt in macroeconomic relations and aggregates applied the methods of descriptive statistics, and used the official data of the relevant national and international institutions. The main results of the analysis indicate a crisis of public finances, which are accumulated for many years, with a growing budget deficit and the dominant external financing of the budget deficit.

  12. The efect of the financial crisis on Croatia ’s primary budget deficit and public debt

    Directory of Open Access Journals (Sweden)

    Petar Sopek

    2009-09-01

    Full Text Available movements and sustainability of the public debt in the period up to 2013. It is shown that changes in the public debt come from the effect of the primary deficit created, stockflow adjustment, the real growth of the GDP and real interest rates. On the basis of results of the European Communities (2009 a statistical estimate is given of the trends in the primary deficit for EU-12, after which the model is adjusted to Croatian figures. The projection of stock-flow adjustment is undertaken from a projection of the primary deficit, due to the relatively strong negative correlation between those two variables in the past, whilst the projection of the real growth rate of the GDP and real interest rates is significantly simplified. The main hypothesis tested is that the ratio of the public debt in the GDP up to 2013 does not exceed the margin of sustainability prescribed in the Maastricht criterion of 60%, which is finally confirmed by this analysis.

  13. Defense.gov Special Report: 2016 Fiscal Budget

    Science.gov (United States)

    Department of Defense Submit Search DEPARTMENT OF DEFENSE: FY 2016 Budget Proposal Army Reserve Chief Calls for Budget Flexibility The chief of the Army Reserve understands that the U.S. deficit is a threat to effectively. Story Obama Says He Won't Accept Budget That Shortchanges Readiness President Barack Obama

  14. MODEL OF DISTRIBUTION OF THE BUDGET OF THE PORTFOLIO OF IT PROJECTS TAKING IN-TO ACCOUNT THEIR PRIORITY

    Directory of Open Access Journals (Sweden)

    Anita V. Sotnikova

    2015-01-01

    Full Text Available Article is devoted to a problem of effective distribution of the general budget of a portfolio between the IT projects which are its part taking into ac-count their priority. The designated problem is actual in view of low results of activity of the consulting companies in the sphere of information technologies.For determination of priority of IT projects the method of analytical networks developed by T. Saati is used. For the purpose of application of this method the system of criteria (indicators reflecting influence of IT projects of a portfolio on the most significant purposes of implementation of IT projects of a portfolio is developed. As system of criteria the key indicators of efficiency defined when developing the Balanced system of indicators which meet above-mentioned requirements are used. The essence of a method of analytical net-works consists in paired comparison of key indicators of efficiency concerning the purpose of realization of a portfolio and IT projects which are a part of a portfolio. Result of use of a method of analytical networks are coefficients of priority of each IT project of a portfolio. The received coefficients of priority of IT projects are used in the offered model of distribution of the budget of a portfolio between IT projects. Thus, the budget of a portfolio of IT projects is distributed between them taking into account not only the income from implementation of each IT project, but also other criteria, important for the IT company, for example: the degree of compliance of the IT project to strategic objectives of the IT company defining expediency of implementation of the IT project; the term of implementation of the IT project determined by the customer. The developed model of distribution of the budget of a portfolio between IT projects is approved on the example of distribution of the budget between IT projects of the portfolio consisting of three IT projects. Taking into account the received

  15. THE POSITION BUDGETS OF ADMINISTRATIVE AND TERRITORIAL UNITS IN GENERAL CONSOLIDATED BUDGET

    Directory of Open Access Journals (Sweden)

    CHIRCULESCU MARIA FELICIA

    2017-12-01

    Full Text Available The budget is a tool of territorial administrative units of financial and budgetary policy in which the state intervenes in the economy at the local level, having a major impact on general government.Through the decentralization processes that are increasingly debated and applied, the paper aims to highlight the importance of the territorial administrative unit budgets in the consolidated budget in Romania.Thus, the work comprises both theoretical notions concerning the presentation of the consolidated state budget and the budget of the territorial administrative units. The relevance of the work lies in the importance of general government in the regulation of macroeconomic balances by sizing or macroeconomic imbalances, with modern methods that analyze the possibilities and effects of new types of deficits or surpluses in the public sector.

  16. THE IMPACT OF SYSTEM OF BUDGET EQUILIBRATION ON MACROECONOMIC INDEXES OF RUSSIAN FEDERATION

    Directory of Open Access Journals (Sweden)

    E.V. Peshina

    2007-12-01

    Full Text Available Theoretical regulations of basic conceptions of budget equilibration are considered in the article and the position of budget deficit/proficit in a system of socioeconomics relations is grounded. Estimation of control mechanism of budget deficit and proficit in the system of socioeconomics relations was conducted. This estimation confirmed an analysis inference about large discontinuity and fragmentation, that is outboard, first of all in respect of strategy of financial policy, sum-total of using, at present, principles, methods and regulations of budgetary management. The article contains a description of basic directions of budgetary policy about optimization of budget deficit/proficit in Russian Federation.

  17. The Twin Deficits Hypothesis: An Empirical Analysis for Tanzania

    Directory of Open Access Journals (Sweden)

    Manamba Epaphra

    2017-09-01

    Full Text Available This paper examines the relationship between current account and government budget deficits in Tanzania. The paper tests the validity of the twin deficits hypothesis, using annual time series data for the 1966-2015 period. The paper is thought to be significant because the concept of the twin deficit hypothesis is fraught with controversy. Some researches support the hypothesis that there is a positive relationship between current account deficits and fiscal deficits in the economy while others do not. In this paper, the empirical tests fail to reject the twin deficits hypothesis, indicating that rising budget deficits put more strain on the current account deficits in Tanzania. Specifically, the Vector Error Correction Model results support the conventional theory of a positive relationship between fiscal and external balances, with a relatively high speed of adjustment toward the equilibrium position. This evidence is consistent with a small open economy. To address the problem that may result from this kind of relationship, appropriate policy variables for reducing budget deficits such as reduction in non-development expenditure, enhancement of domestic revenue collection and actively fight corruption and tax evasion should be adopted. The government should also target export oriented firms and encourage an import substitution industry by creating favorable business environments.

  18. Successful Control of Major Project Budgets

    Directory of Open Access Journals (Sweden)

    Steen Lichtenberg

    2016-07-01

    Full Text Available This paper differs from scientific papers describing current research. In line with the theme of this special issue, it challenges conventional risk management practice against the background of former research results successfully finished decades ago. It is well-known that conventional practice frequently results in budget overruns of large projects. International reviews document that. Severe delays of schedules are also well-known. This paper describes successful research results from almost three decades ago, which successfully challenges this severe problem and has led to new practices. The research involved is an unusual mix: Scandinavian researchers from psychology, statistical theory and engineering economy. The resulting procedure has been widely used since around 1990 and challenges conventional procedures. The procedure is documented to be able to yield statistically correct prognoses, when the “rules of the game” have been correctly followed. After a short summary of the basic situation, this paper summarizes the research, followed by some resulting experiences, focusing on two recent studies each of 40 infrastructures and other major projects. In both sets, the actual final cost largely equaled the expected project cost. This result is a marked change from international past and present experience. Finally, the need for further research and progress is discussed.

  19. Effectiveness evaluation of the R&D projects in organizations financed by the budget expenses

    Science.gov (United States)

    Yakovlev, D.; Yushkov, E.; Pryakhin, A.; Bogatyreova, M.

    2017-01-01

    The issues of R&D project performance and their prospects are closely concerned with knowledge management. In the initial stages of the project development, it is the quality of the project evaluation that is crucial for the result and generation of future knowledge. Currently there does not exist any common methodology for the evaluation of new R&D financed by the budget. Suffice it to say, the assessment of scientific and technical projects (ST projects) varies greatly depending on the type of customer - government or business structures. An extensive methodological groundwork was formed with respect to orders placed by business structures. It included “an internal administrative order” by the company management for the results of STA intended for its own ST divisions. Regretfully this is not the case with state orders in the field of STA although the issue requires state regulation and official methodological support. The article is devoted to methodological assessment of scientific and technical effectiveness of studies performed at the expense of budget funds, and suggests a new concept based on the definition of the cost-effectiveness index. Thus, the study reveals it necessary to extend the previous approach to projects of different levels - micro-, meso-, macro projects. The preliminary results of the research show that there must be a common methodological approach to underpin the financing of projects under government contracts within the framework of budget financing and stock financing. This should be developed as general guidelines as well as recommendations that reflect specific sectors of the public sector, various project levels and forms of financing, as well as different stages of project life cycle.

  20. 25 CFR 170.915 - May tribal employment taxes or fees be included in an IRR project budget?

    Science.gov (United States)

    2010-04-01

    ... Preference § 170.915 May tribal employment taxes or fees be included in an IRR project budget? Yes. The cost of tribal employment taxes or fees may be included in the budget for an IRR program or project... 25 Indians 1 2010-04-01 2010-04-01 false May tribal employment taxes or fees be included in an IRR...

  1. Budgeting for International Projects: In-Country Business Operations and Long-Term Residential Assignments.

    Science.gov (United States)

    Richey, John B.

    1994-01-01

    A discussion of international sponsored research program administration looks at budgeting, costs, and procedures for both projects with in-country business operations in developing nations and projects with long-term residential assignments. It is intended for university administrators providing new services to faculty working on international…

  2. Adult Dyslexia and Attention Deficit Disorder in Finland--Project DyAdd: WAIS-III Cognitive Profiles

    Science.gov (United States)

    Laasonen, Marja; Leppamaki, Sami; Tani, Pekka; Hokkanen, Laura

    2009-01-01

    The project Adult Dyslexia and Attention Deficit Disorder in Finland (Project DyAdd) compares adults (n = 119, 18-55 years) with dyslexia, attention-deficit/hyperactivity disorder (ADHD), dyslexia together with ADHD (comorbid), and healthy controls with neuropsychological, psychophysical, and biological methods. The focus of this article is on the…

  3. The Geostationary Earth Radiation Budget Project.

    Science.gov (United States)

    Harries, J. E.; Russell, J. E.; Hanafin, J. A.; Brindley, H.; Futyan, J.; Rufus, J.; Kellock, S.; Matthews, G.; Wrigley, R.; Last, A.; Mueller, J.; Mossavati, R.; Ashmall, J.; Sawyer, E.; Parker, D.; Caldwell, M.; Allan, P. M.; Smith, A.; Bates, M. J.; Coan, B.; Stewart, B. C.; Lepine, D. R.; Cornwall, L. A.; Corney, D. R.; Ricketts, M. J.; Drummond, D.; Smart, D.; Cutler, R.; Dewitte, S.; Clerbaux, N.; Gonzalez, L.; Ipe, A.; Bertrand, C.; Joukoff, A.; Crommelynck, D.; Nelms, N.; Llewellyn-Jones, D. T.; Butcher, G.; Smith, G. L.; Szewczyk, Z. P.; Mlynczak, P. E.; Slingo, A.; Allan, R. P.; Ringer, M. A.

    2005-07-01

    This paper reports on a new satellite sensor, the Geostationary Earth Radiation Budget (GERB) experiment. GERB is designed to make the first measurements of the Earth's radiation budget from geostationary orbit. Measurements at high absolute accuracy of the reflected sunlight from the Earth, and the thermal radiation emitted by the Earth are made every 15 min, with a spatial resolution at the subsatellite point of 44.6 km (north south) by 39.3 km (east west). With knowledge of the incoming solar constant, this gives the primary forcing and response components of the top-of-atmosphere radiation. The first GERB instrument is an instrument of opportunity on Meteosat-8, a new spin-stabilized spacecraft platform also carrying the Spinning Enhanced Visible and Infrared (SEVIRI) sensor, which is currently positioned over the equator at 3.5°W. This overview of the project includes a description of the instrument design and its preflight and in-flight calibration. An evaluation of the instrument performance after its first year in orbit, including comparisons with data from the Clouds and the Earth's Radiant Energy System (CERES) satellite sensors and with output from numerical models, are also presented. After a brief summary of the data processing system and data products, some of the scientific studies that are being undertaken using these early data are described. This marks the beginning of a decade or more of observations from GERB, as subsequent models will fly on each of the four Meteosat Second Generation satellites.

  4. Voting behavior and budget stability

    Directory of Open Access Journals (Sweden)

    Cristina Vicente

    2013-01-01

    Full Text Available The aim of this paper is to analyze how the implementation of the Budgetary Stability Law has affected Political Budget Cycles generated by Spanish local governments. Specifically, we study whether the evolution of debt, budget deficit, capital spending and current spending over the electoral cycle has changed after the introduction of this law. We use a sample of 132 Spanish municipalities with more than 50,000 inhabitants (including the provincial capitals during the period 1995–2009. Our results show that the Budgetary Stability Law has avoided electoral cycles in debt. On the contrary, the adoption of this law has not mitigated the incumbents’ incentives to manipulate deficit, capital spending and current spending with electoral aims. Nevertheless, it has caused a change in the way in which mayors manipulate fiscal policy over the electoral cycle. The opportunistic expansion covered both preelectoral year and the electoral year before the implementation of this fiscal rule, while after that, deficit and spending increases are confined in the election year.

  5. Corn Belt soil carbon and macronutrient budgets with projected sustainable stover harvest

    Science.gov (United States)

    Tan, Zhengxi; Liu, Shu-Guang

    2015-01-01

    Corn (Zea mays L.) stover has been identified as a prime feedstock for biofuel production in the U.S. Corn Belt because of its perceived abundance and availability, but long-term stover harvest effects on regional nutrient budgets have not been evaluated. We defined the minimum stover requirement (MSR) to maintain current soil organic carbon levels and then estimated current and future soil carbon (C), nitrogen (N), phosphorus (P), and potassium (K) budgets for various stover harvest scenarios. Analyses for 2006 through 2010 across the entire Corn Belt indicated that currently, 28 Tg or 1.6 Mg ha−1 of stover could be sustainably harvested from 17.95 million hectares (Mha) with N, P, and K removal of 113, 26, and 47 kg ha−1, respectively, and C removal for that period was estimated to be 4.55 Mg C ha−1. Assuming continued yield increases and a planted area of 26.74 Mha in 2050, 77.4 Tg stover (or 2.4 Mg ha−1) could be sustainably harvested with N, P, and K removal of 177, 37, and 72 kg ha−1, respectively, along with C removal of ∼6.57 Mg C ha−1. Although there would be significant variation across the region, harvesting only the excess over the MSR under current fertilization rates would result in a small depletion of soil N (−5 ± 27 kg ha−1) and K (−20 ± 31 kg ha−1) and a moderate surplus of P (36 ± 18 kg ha−1). Our 2050 projections based on continuing to keep the MSR, but having higher yields indicate that soil N and K deficits would become larger, thus emphasize the importance of balancing soil nutrient supply with crop residue removal.

  6. The problem of budgetary deficit in modern economies

    Directory of Open Access Journals (Sweden)

    Stanulović Milana

    2017-01-01

    Full Text Available A surplus of expenditure over revenues in the government budget is called a budgetary deficit. Budgetary deficit, in itself, is not a negative thing. If the budgetary deficit allows full employment and helps reaching economic policy goals, there is full understanding for having a budgetary deficit. Budgetary deficit of the Republic of Serbia has shown an increasing tendency in the period 2005-2016. After this period, budgetary deficit has started to decrease as a result of fiscal consolidation measures. Besides avoiding the negative consequences of a budgetary deficit, Serbia has to maintain its budgetary deficit at a level below 3% of GDP, because that is a requirement for joining the European Union. This also applies to countries which are already members of the EU, but they have the right to short term deviations during the economic crisis. The European Union uses these rules to maintain fiscal discipline. By comparing budgetary deficits of the developed and developing countries, we can see a big difference in levels of deficits. Developed countries have higher deficits in the first years of economic recession, while the developing countries' budgets show economic crisis consequences in the subsequent years. The reasons for that lie in crisis overflow channels, thanks to which the developed countries were the first to experience crisis, and only later it affected the developing countries, too.

  7. Zero-based budgeting: Pathway to sustainable budget implementation in Nigeria

    Directory of Open Access Journals (Sweden)

    Udeh Francis Nnoli

    2017-10-01

    Full Text Available This paper investigates the application of Zero-Based Budgeting (ZBB system to budget implementation by the Federal Government of Nigeria by ascertaining among others, the relationship between ZBB approach and budget performance indices in Nigeria. To achieve the above, primary data were obtained through questionnaires that were specifically designed for this study. The data obtained were analysed with the SPSS version 21. The statistical tools employed were Analysis of Variance (ANOVA and Pearson Correlation Coefficiant (PCC. The Cronbach’s Alpha reliability test was used to test the internal consistency/reliability of the instrument used for the study. On the basis of the analysis, we found that there is significant difference in the effectiveness of ZBB in terms of budget implementation compared to the Traditional Budgeting System (TBS. It was also found that the application of ZBB tend to be performance-driven and is able to detect the redundant programmes/projects and staff, thereby recommending either realignment, discharge, transfer or redeployment of projects or resources. The study therefore, recommends among others that ZBB should be encouraged as a good means of budget implementation and also close monitoring of budget execution should be enshrined in work ethics at every stage of budget preparation and implementation in the country. This is believed would go a long way to strengthen measures aimed at mitigating poor budget implementation in the country.

  8. Public Budget Database - Budget Authority and offsetting receipts 1976-Current

    Data.gov (United States)

    Executive Office of the President — This file contains historical budget authority and offsetting receipts for 1976 through the current budget year, as well as four years of projections. It can be used...

  9. State Authorities’ Powers to Determine the Budget Deficit and Public Debt in the Light of the Articles of the Constitution and the Law of the European Union

    Directory of Open Access Journals (Sweden)

    Andrzej Borodo

    2013-10-01

    Full Text Available The issues of public debt and budget deficit are regulated by constitutions (e.g. of Poland, Germany, Spain as well as by the law of the European Union. The constitutional regulations concerning public debt and deficit are norms primarily directed at governments and parliaments. However, these regulations mainly have a preventive and auxiliary character and cannot by themselves stop the debt level of the state from increasing. Financial aims concerning debt and deficit can be achieved by non-financial methods, i.e. through the appropriate social and economic policies implemented by the authorities enjoying considerable social respect. The EU regulations regarding public debt and deficit can only be implemented with the instruments of the national law. The set of the EU regulations limiting the budgetary powers of member states, including the budgetary powers of governments and national parliaments, are questionable and undermine the authority of the state.

  10. Implications of Project-Based Funding of Research on Budgeting and Financial Management in Public Universities

    Science.gov (United States)

    Raudla, Ringa; Karo, Erkki; Valdmaa, Kaija; Kattel, Rainer

    2015-01-01

    The main goal of the paper is to explore--both theoretically and empirically--the implications of project-based research funding for budgeting and financial management at public universities. The theoretical contribution of the paper is to provide a synthesized discussion of the possible impacts of project-based funding on university financial…

  11. Budget Period 1 Summary Report: Hywind Maine Project

    Energy Technology Data Exchange (ETDEWEB)

    Keiser, Meagan [Statoil, Stavanger (Norway)

    2014-02-28

    In accordance with the Statement of Project Objectives (SOPO) agreed to between the Department of Energy (“DOE”) and Statoil for the Hywind Maine project, Statoil hereby submits a Budget Period 1 Summary Report which includes accomplishments for the project. The report includes summaries of the other submitted reports (see Section 1.2-2) and progress regarding innovations leading to potential reductions in the Cost of Energy (see Section 3). The Hywind Demo project, the world’s first full-scale 2.3 megawatts (MW) floating wind turbine, installed at a water depth of 200 meter (m), 10 kilometer (km) off the coast of Norway, has proven that the Hywind floating substructure is a suitable platform for conventional multi- MW turbines. A principal goal of the Hywind Maine Project was to leverage that experience, both to demonstrate the commercial feasibility of the technology and to further develop and optimize the technology all in order to bring the costs down in a larger scale development. With the Hywind Maine Project, Statoil planned to deploy four turbines of 3 MW in approximately 140 meters water depth. Although the project in Maine will not move forward, much value was gained through the BP1 work package. Advanced modeling related to the design basis, which will have applicability beyond the Maine project, was completed. In addition, initial supply chain analyses were conducted, which will help assist with development of updated cost of energy models. Geophysical and various environmental surveys were also conducted, the results of which Statoil has committed to share publicly, and which will help build a database of information that future developers may be able to access. Finally, Statoil gained a greater understanding of the US offshore wind industry and related markets, which will assist the company as it looks for full-scale, commercial opportunities.

  12. Evolution of Safeguards over Time: Past, Present, and Projected Facilities, Material, and Budget

    Energy Technology Data Exchange (ETDEWEB)

    Kollar, Lenka; Mathews, Caroline E.

    2009-07-01

    This study examines the past trends and evolution of safeguards over time and projects growth through 2030. The report documents the amount of nuclear material and facilities under safeguards from 1970 until present, along with the corresponding budget. Estimates for the future amount of facilities and material under safeguards are made according to non-nuclear-weapons states’ (NNWS) plans to build more nuclear capacity and sustain current nuclear infrastructure. Since nuclear energy is seen as a clean and economic option for base load electric power, many countries are seeking to either expand their current nuclear infrastructure, or introduce nuclear power. In order to feed new nuclear power plants and sustain existing ones, more nuclear facilities will need to be built, and thus more nuclear material will be introduced into the safeguards system. The projections in this study conclude that a zero real growth scenario for the IAEA safeguards budget will result in large resource gaps in the near future.

  13. Evolution of Safeguards over Time: Past, Present, and Projected Facilities, Material, and Budget

    International Nuclear Information System (INIS)

    Kollar, Lenka; Mathews, Caroline E.

    2009-01-01

    This study examines the past trends and evolution of safeguards over time and projects growth through 2030. The report documents the amount of nuclear material and facilities under safeguards from 1970 until present, along with the corresponding budget. Estimates for the future amount of facilities and material under safeguards are made according to non-nuclear-weapons states (NNWS) plans to build more nuclear capacity and sustain current nuclear infrastructure. Since nuclear energy is seen as a clean and economic option for base load electric power, many countries are seeking to either expand their current nuclear infrastructure, or introduce nuclear power. In order to feed new nuclear power plants and sustain existing ones, more nuclear facilities will need to be built, and thus more nuclear material will be introduced into the safeguards system. The projections in this study conclude that a zero real growth scenario for the IAEA safeguards budget will result in large resource gaps in the near future.

  14. SAY NO TO NEW BUDGET CUTS !

    CERN Multimedia

    STAFF ASSOCIATION

    2010-01-01

    In June, CERN Finance Committee postponed its proposals for the 2011 budget and the Director-General’s medium-term plan (2012–2015). The Member State delegations asked for a significant reduction in these budgets. The Staff Association condemns this request for new budget cuts which shows a short-term political vision. It is therefore organizing a demonstration on 25th August to defend basic research in Europe. On this day your presence is indispensable. Enough of simply getting by ! We know that budget cuts and the reduction of deficits are topical in several countries. The areas of research and training are also affected. However, in the case of CERN, severe budgetary constraints have been imposed for several years now, in particular since 1996 when the Organization’s budget was reduced by around 10%, just when the construction of the LHC was due to start. Since then, 100 million Swiss francs have been lost each year, reducing CERN’s resources to a minimum. All e...

  15. Can heterotrophic uptake of dissolved organic carbon and zooplankton mitigate carbon budget deficits in annually bleached corals?

    Science.gov (United States)

    Levas, Stephen; Grottoli, Andréa G.; Schoepf, Verena; Aschaffenburg, Matthew; Baumann, Justin; Bauer, James E.; Warner, Mark E.

    2016-06-01

    Annual coral bleaching events due to increasing sea surface temperatures are predicted to occur globally by the mid-century and as early as 2025 in the Caribbean, and severely impact coral reefs. We hypothesize that heterotrophic carbon (C) in the form of zooplankton and dissolved organic carbon (DOC) is a significant source of C to bleached corals. Thus, the ability to utilize multiple pools of fixed carbon and/or increase the amount of fixed carbon acquired from one or more pools of fixed carbon (defined here as heterotrophic plasticity) could underlie coral acclimatization and persistence under future ocean-warming scenarios. Here, three species of Caribbean coral— Porites divaricata, P. astreoides, and Orbicella faveolata—were experimentally bleached for 2.5 weeks in two successive years and allowed to recover in the field. Zooplankton feeding was assessed after single and repeat bleaching, while DOC fluxes and the contribution of DOC to the total C budget were determined after single bleaching, 11 months on the reef, and repeat bleaching. Zooplankton was a large C source for P. astreoides, but only following single bleaching. DOC was a source of C for single-bleached corals and accounted for 11-36 % of daily metabolic demand (CHARDOC), but represented a net loss of C in repeat-bleached corals. In repeat-bleached corals, DOC loss exacerbated the negative C budgets in all three species. Thus, the capacity for heterotrophic plasticity in corals is compromised under annual bleaching, and heterotrophic uptake of DOC and zooplankton does not mitigate C budget deficits in annually bleached corals. Overall, these findings suggest that some Caribbean corals may be more susceptible to repeat bleaching than to single bleaching due to a lack of heterotrophic plasticity, and coral persistence under increasing bleaching frequency may ultimately depend on other factors such as energy reserves and symbiont shuffling.

  16. Deficit pubblico, tassi d'interesse reali a lungo termine ex-post e casualità

    Directory of Open Access Journals (Sweden)

    R.J. CEBULA

    2013-10-01

    Full Text Available A number of empirical studies have investigated the impact of the federal Government budget deficit on interest rates in the US with most of them concluding that it is positive and significant on long-term interest rates. Both the IS/LM and the loanable funds frameworks through which this relationship is usually couched imply that causality flows from increased deficits to interest rates. The present work argues that the direction of causality may well be the reverse, that is real long-term interest rates may cause the budget deficit. The author offers two reasons to support this hypothesis. First, much or the Government’s debt is financed or refinanced in just a few short years. Second, according to conventional macroeconomic theory, a rise in the real interest rate should lead to a fall in real economic growth. A multivariate causality test is employed to determine the direction of causality among the real long-term interest rate, the unemployment rate and the structural deficit.  JEL Codes: H6, E43Keywords: Budget deficit, interest rates, economic growth

  17. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  18. PROJECT ABANDONMENT, CORRUPTION AND RECOVERY OF UNSPENT BUDGETED PUBLIC FUNDS IN NIGERIA

    Directory of Open Access Journals (Sweden)

    Richard INGWE

    2012-06-01

    Full Text Available Large amounts of unspent funds budgeted for implementing development projects have been recovered from Nigeria’s public officials since President Yar Adua directed in 2007 that responsible Nigerian Ministries, Departments and Agencies (MDAs must refund such funds at the end of every fiscal year. While unspent funds recovery represents some progress in the “war on corruption” entrenched by previous governments in the 1980s, the current policy limited by concentrating narrowly on recovery of financial resources thereby excluding accounting for other project resources (human skills application, time management or optimization among others that are usually applied to project implementation but lost through public officers’ failure and/or delays to implement planned projects. This article examines the magnitude of unspent funds recently recovered by the government from its various ministries, departments and agencies (MDAs. The general objective of this article is to contribute towards improving the development project management culture in Nigeria. The specific objectives are: To highlight the magnitude of unspent funds in Nigeria’s MDAs; and to show some adverse consequences of failing (or delaying to spend funds allocated in the budget forimplementing projects in economic sectors and on the pursuit of development objectives. Survey and description methods were used. Data on the refund of unspent funds was obtained from secondary sources (records of MDAs and analysed using qualitative and simple quantitative techniques. Results show that a high rate of projects delay and /or abandonment was discovered shortly after the inauguration of President Yar’ Adua and his administration in May 2007. Although some project funds have been recovered, other project resources (time wasted, human skills/hours and development benefits that would have accrued from completion of the planned and financed projects have not been recovered but lost. The fact

  19. Budget institutions and fiscal performance of the Brazilian Federal Government

    Directory of Open Access Journals (Sweden)

    Ana Carolina Giuberti

    2015-05-01

    Full Text Available This article aims to assess the impact of federal budget institutions on the primary deficit of the Brazilian Federal Government from 1985 to 2009, a period marked by important changes in these institutions. Based on the methodology established in the literature on political economy that is linked to the macroeconomic mainstream, three sets of budget indices and their respective sub-indices are constructed, and their behaviour over the period of analysis indicate that the changes made have resulted in institutions that induce greater fiscal discipline. Regarding the effect of these institutions on the fiscal performance, the results allow us to conclude that the institutional changes have contributed to a lower government deficit.

  20. Budgeting, funding, and managing clinical research projects.

    Science.gov (United States)

    Hatfield, Elizabeth; Dicks, Elizabeth; Parfrey, Patrick

    2009-01-01

    Large, integrated multidisciplinary teams have become recognized as an efficient means by which to drive innovation and discovery in clinical research. This chapter describes how to budget and fund these large studies and effectively manage the large, often dispersed teams involved. Sources of funding are identified; budget development, justification, reporting, financial governance, and accountability are described; in addition to the creation and management of the multidisciplinary team that will implement the research plan.

  1. Spatial structures in the heat budget of the Antarctic Atmospheric Boundary Layer

    NARCIS (Netherlands)

    van der Berg, W.J.; van den Broeke, M.R.; van Meijgaard, E.

    2008-01-01

    Output from the regional climate model RACMO2/ANT is used to calculate the heat budget of the Antarctic atmospheric boundary layer (ABL). The main feature of the wintertime Antarctic ABL is a persistent temperature deficit compared to the free atmosphere. The magnitude of this deficit is controlled

  2. ACCOUNTING INFORMATION - A BASIS FOR ACHIEVING THE DECISION FOR THE REALIZATION OF PUBLIC INVESTMENT PROJECT

    OpenAIRE

    Sarac Ionut Pavel

    2012-01-01

    Accounting information plays a key role in the foundation process of public sector decisions. Financing budget deficits, treasury risk identification (availability risk), formation of tax claims, foundation of financial sustainability for public investment projects are just some examples of using accounting information in decision-making process of credit accountant. How can we use and process accounting information in the foundation of public investment projects? We will try to answer this q...

  3. Projected change in East Asian summer monsoon by dynamic downscaling: Moisture budget analysis

    Science.gov (United States)

    Jung, Chun-Yong; Shin, Ho-Jeong; Jang, Chan Joo; Kim, Hyung-Jin

    2015-02-01

    The summer monsoon considerably affects water resource and natural hazards including flood and drought in East Asia, one of the world's most densely populated area. In this study, we investigate future changes in summer precipitation over East Asia induced by global warming through dynamical downscaling with the Weather Research and Forecast model. We have selected a global model from the Coupled Model Intercomparison Project Phase 5 based on an objective evaluation for East Asian summer monsoon and applied its climate change under Representative Concentration Pathway 4.5 scenario to a pseudo global warming method. Unlike the previous studies that focused on a qualitative description of projected precipitation changes over East Asia, this study tried to identify the physical causes of the precipitation changes by analyzing a local moisture budget. Projected changes in precipitation over the eastern foothills area of Tibetan Plateau including Sichuan Basin and Yangtze River displayed a contrasting pattern: a decrease in its northern area and an increase in its southern area. A local moisture budget analysis indicated the precipitation increase over the southern area can be mainly attributed to an increase in horizontal wind convergence and surface evaporation. On the other hand, the precipitation decrease over the northern area can be largely explained by horizontal advection of dry air from the northern continent and by divergent wind flow. Regional changes in future precipitation in East Asia are likely to be attributed to different mechanisms which can be better resolved by regional dynamical downscaling.

  4. Preparing the operating budget.

    Science.gov (United States)

    Williams, R B

    1983-12-01

    The process of preparing a hospital pharmacy budget is presented. The desired characteristics of a budget and the process by which it is developed and approved are described. Fixed, flexible, and zero-based budget types are explained, as are the major components of a well-developed budget: expense, workload, productivity, revenue, and capital equipment and other expenditures. Specific methods for projecting expenses and revenues, based on historical data, are presented along with a discussion of variables that must be considered in order to achieve an accurate and useful budget. The current shift in emphasis away from revenue capture toward critical analysis of pharmacy costs underscores the importance of budgetary analysis for hospital pharmacy managers.

  5. 7 CFR 3015.115 - Budget revisions.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Budget revisions. 3015.115 Section 3015.115..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Programmatic Changes and Budget Revisions § 3015.115 Budget revisions. (a) Nonconstruction projects. (1) Except as provided in paragraph (a)(2) of...

  6. Fiscal Deficits and Stock Prices in India: Empirical Evidence

    Directory of Open Access Journals (Sweden)

    Pooja Joshi

    2015-08-01

    Full Text Available The study aims at examining how fiscal deficits affect the performance of the stock market in India by using annual data from 1988–2012. The study makes use of Ng-Perron unit root tests to check the non-stationarity property of the series; the Auto Regressive Distributed Lag (ARDL bounds test and a Vector Error Correction Model (VECM for testing both short and long run dynamic relationships. The variance decomposition (VDC is used to predict the exogenous shocks of the variables. The findings of the bounds test reveal that the estimated equation and the series are co-integrated. The ARDL results suggest a long run negative relationship exists between budget deficit and stock prices and do not show any significant relationship in the short run. The VECM result shows that fiscal deficits influence the stock price only in the short run. The results of the Variance Decomposition show that stock price movement in the long run is mostly explained by shocks of fiscal deficits. The study implies that the government must adopt appropriate macroeconomic policies to reduce budget deficit, which will result in stock market growth and in turn will lead to the financial development of the country.

  7. The hydrological characterisation and water budget of a South ...

    African Journals Online (AJOL)

    The hydrological characterisation and water budget of a South African rehabilitated ... Hydrograph separation, based on stable isotopes (18O), revealed that the ... during the summer rains when the wetlands soil moisture deficit is close to 0, ...

  8. 34 CFR 75.251 - The budget period.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false The budget period. 75.251 Section 75.251 Education... Multi-Year Projects § 75.251 The budget period. (a) The Secretary usually approves a budget period of... budget period; and (2) Indicates his or her intention to make contination awards to fund the remainder of...

  9. The AquaDEB project: Physiological flexibility of aquatic animals analysed with a generic dynamic energy budget model (phase II).

    NARCIS (Netherlands)

    Alunno-Bruscia, M.; v.d. Veer, H.; Kooijman, S.A.L.M.

    2011-01-01

    This second special issue of the Journal of Sea Research on development and applications of Dynamic Energy Budget (DEB) theory concludes the European Research Project AquaDEB (2007-2011). In this introductory paper we summarise the progress made during the running time of this 5. years' project,

  10. The Economic and Budget Outlook: An Update

    National Research Council Canada - National Science Library

    1999-01-01

    .... It satisfies the requirement of section 202(e) of the Congressional Budget Act of 1974 for CBO to submit periodic reports to the Committees on the Budget with respect to fiscal policy and to provide five-year baseline projections of the federal budget...

  11. Deficit and External Debt Effects on Money and Inflation in Brazil and Mexico: Some Evidence

    OpenAIRE

    Bharat R. Koluri; Demetrios S. Giannaros

    1987-01-01

    The purpose of this study is to examine the monetarist propositions regarding the effects of budget deficits, external debt, and money growth on inflation in the cases of Brazil and Mexico. To this end, a money growth equation and a price equation have been specified and estimated for empirical analysis. In general, it is concluded that the government budget deficit is not a determinant of money supply growth or of inflation. External debt is found to be a significant factor of money growth. ...

  12. A Primer on the Government of Alberta’s Budget

    Directory of Open Access Journals (Sweden)

    Ronald D. Kneebone

    2013-01-01

    Full Text Available Provincial budgets may normally make for dry reading, but in Alberta’s case, there is plenty of suspense lurking inside the pages — and that’s not necessarily a good thing. Your average family may know certain things about balancing a budget: keeping spending roughly in line with income; not relying on volatile, unpredictable income streams to cover expenses; and not leaving the kids with an inheritance of significant debt. But look at how Alberta has been managing its budget in the last decade, and it is obvious that the provincial government is breaking a lot of the financial management rules that most Albertans are disciplined enough to live by at home. A clear way to get a sense of how the Alberta government has managed its finances is by analyzing how much provincial program spending relies on depleting provincial savings, either in the form of savings funds or non-renewable resource deposits, such as oil and gas. By 2011, Alberta’s “Budget Gap” had grown to almost the same level it was in 1993, when the province was forced to adopt wrenching budget cuts in order to close what had become a yawning gap between revenue and costs amounting to $4,000 in spending for every man, woman and child in the province. This paper suggests there are three key questions that should be posed to our government and to any political party seeking to represent our interests as our government: 1. How tolerant are they of annual deficits? Do they advocate a strategy of relatively lower levels of government spending and/or higher tax rates, so as to avoid deficits no matter the state of the economy? Or will they tolerate deficits during economic slowdowns to enable higher levels of spending and/or lower tax rates? 2. To what extent are they willing to trust the payment of health-care costs and the costs of education and social assistance to oil and gas royalties as opposed to taxation? 3. How, exactly, does one define investments in social

  13. VERIFICATION PROCEDURE EUROPEAN FUNDED PROJECTS THROUGH FINANCIAL AUDITS

    Directory of Open Access Journals (Sweden)

    Riana Iren RADU

    2014-06-01

    Full Text Available The work developed by the authors assumes a definite need for reflection on funding mechanisms and macroeconomic management at all levels of budget deficit, amid the economic crisis unprecedented in the recent history of Romania and the whole of Europe. In this direction, this paper attempts to highlight issues that arise in terms of absorption of European funds for economic development based on this absorption emphasizing the role of grants in the economy and the need to audit projects.

  14. Health care prices, the federal budget, and economic growth.

    Science.gov (United States)

    Monaco, R M; Phelps, J H

    1995-01-01

    Rising health care spending, led by rising prices, has had an enormous impact on the economy, especially on the federal budget. Our work shows that if rapid growth in health care prices continues, under current institutional arrangements, real economic growth and employment will be lower during the next two decades than if health price inflation were somehow reduced. How big the losses are and which sectors bear the brunt of the costs vary depending on how society chooses to fund the federal budget deficit that stems from the rising cost of federal health care programs.

  15. Key Questions on the Obama Administration's 2013 Education Budget Request: Federal Education Budget Project. Issue Brief

    Science.gov (United States)

    New America Foundation, 2012

    2012-01-01

    President Barack Obama submitted his third budget request to Congress on February 13th, 2012. The budget request includes proposed funding levels for all federal programs and agencies in aggregate for the upcoming 10 fiscal years, and specific fiscal year 2013 funding levels for programs subject to the annual appropriations process. It is…

  16. The Long Term Impact of Budget Deficits on Economic Growth In ...

    African Journals Online (AJOL)

    There were significant positive long-run relationships between the capital stock, ... however, be to use the budget to create the necessary public investments in capital ... linkages with agriculture and industry to generate good future returns.

  17. Contradicting the twin deficits hypothesis: The role of tax revenues composition

    Directory of Open Access Journals (Sweden)

    Obadić Alka

    2014-01-01

    Full Text Available The general theory of twin deficits hypothesis does not consider specific characteristics of domestic tax systems, i.e. whether the revenue side of the budget is dominated by indirect or by direct taxes. The main hypothesis of the paper is that in countries with fiscal systems dominated by indirect taxes, the deterioration of the current account balance would imply higher fiscal revenues due to larger imports and consumption. The hypothesis is based on the characteristics of domestic tax systems of Bulgaria, Croatia, Poland and Romania in which indirect tax revenues account for the majority of total budget tax revenues. Results suggest that the co-movements of the current account and the fiscal balance cannot be explained by the twin deficit theory in countries with indirect tax-oriented systems. These results imply that only the structural economic transformation and export orientation of the economy may reverse the causality direction between two deficits.

  18. Enflasyon, Bütçe Açığı ve Para Arzı İlişkisinin Türkiye Ekonomisi Açısından Değerlendirilmesi: 1980-2014 Dönemi(Evaluation of Inflation, Budget Deficit and Money Supply Relations in Terms of Turkish Economy: Period of 1980-2014

    Directory of Open Access Journals (Sweden)

    M. Göktuğ KAYA

    2016-12-01

    Full Text Available The aim of this study, based on the hypothesis that there is a close relationship between budget deficits and monetary growth,is to determine the effect of these variables on inflation for Turkish economy using quarterly data on 1980-2014 period. The ARDL bounds testing approach is used in determining this relationshipbecause of variables at different levels stationary as a result of stability analysis.According to the results, while there is a significant and positive relationship between inflation and money supply, there is not significant relationship between inflation and the budget deficit in the long term

  19. The Agency's budget

    International Nuclear Information System (INIS)

    1964-01-01

    A total Agency Budget of $10 406 000 for 1965 was approved by the General Conference at its session of September 1964; the Budget for the year 1964 amounted to $9 812 000. The consolidated Budget figures are shown in the table at the end of this article. The Budget falls into two parts - the Regular Budget and the Operational Budget. The Regular Budget provides for the ordinary administrative expenses of the Agency, and for expert panels, special missions, symposia and conferences, distribution of information, and scientific and technical services. In conformity with the Agency's Statute, these expenses are met by contributions made according to Voluntary contributions are paid initially into a General Fund established for this purpose, and money for operations is transferred to the respective Operating Funds as appropriate, and as approved by the Board of Governors. The scale of assessments for 1965 is based on the United Nations scale for 1964. The assessments are estimated to yield $7 713 000 - an increase of 6.8 per cent; however, more than three quarters of this increase will be offset by credits which Member States will receive as a result of a cash surplus brought forward. The Operational Budget is financed by voluntary contributions and is divided into two parts - Operating Fund I, devoted to certain laboratory and research projects, and Operating Fund II, for technical assistance, training and research contracts.

  20. 78 FR 21608 - Notice of Hearing: Reconsideration of Disapproval of Maine State Plan Amendments (SPA) 12-010

    Science.gov (United States)

    2013-04-11

    ... income exceeds 133 percent of the poverty line.'' Maine certified a projected budget deficit for state... income exceeds 133 percent of the poverty line.'' Maine certified a projected budget deficit for state... income is at or below 133 percent of the federal poverty level (FPL). The proposal would make eligibility...

  1. Variable-Base Budgeting for R&D

    OpenAIRE

    Robert W. Blanning

    1981-01-01

    An issue of theoretical and practical importance to R&D managers is the proper allocation of an organization's resources between the periodic selection and budgeting of R&D projects and the implementation of these projects. One possibility is to consider previous allocations as an established base and to restrict the attention of R&D managers to an examination of any subsequent deviations from the base. The advantage of this strategy, often called incremental budgeting, is that it focuses man...

  2. Budgeting in an imaging Department

    International Nuclear Information System (INIS)

    Nyalla, A. M.

    2006-01-01

    budgeting form an integral part of an imaging department. It is a plan to cope with necessary expenses in the future. It involves identifying the needs and income sources required to cover the needs.Covers specific items and time-usually a year and is expressed in monetary terms. The micro budget is put in the macro budget of the hospital. defines financial support for the department. Considers: a fiscal year, projection of patients, types of examinations, type of equipment, monetary exchange, and inflation rate

  3. Public Higher-Education Systems Face Painful Choices as Three Northeastern States Confront Massive Deficits.

    Science.gov (United States)

    Blumenstyk, Goldie

    1989-01-01

    Massachusetts, Connecticut, and New York face giant deficits in their state budgets. The financial impact of the 1986 federal tax reform law was underestimated by colleges and income estimates were overly optimistic for 1988 and 1989. Unpopular, new taxes are seen as the way to solve the budget crunch. (MLW)

  4. Net Operating Working Capital, Capital Budgeting, and Cash Budgets: A Teaching Example

    Science.gov (United States)

    Tuner, James A.

    2016-01-01

    Many introductory finance texts present information on the capital budgeting process, including estimation of project cash flows. Typically, estimation of project cash flows begins with a calculation of net income. Getting from net income to cash flows requires accounting for non-cash items such as depreciation. Also important is the effect of…

  5. Real Options in Capital Budgeting. Pricing the Option to Delay and the Option to Abandon a Project

    Directory of Open Access Journals (Sweden)

    Nicoleta Vintila

    2007-07-01

    Full Text Available Traditional discounted cash-flows method for assessing projects assumes that investment decision is an irreversible one, which is not correct. Managers can and must reconsider their initial decision as the new information arises during the project life. This is managerial flexibility and it creates strategic value for a project, only if management takes advantage of the opportunities associated with an analyzed project. Real options represent a new approach in capital budgeting, using the theory of pricing financial options for investments in real assets. In this paper, we emphasize the characteristics and valuation methodologies of real options. The objective in the last section is pricing the option to delay and the option to abandon a project in construction materials field.

  6. Stress Analysis in Managing the Region’s Budget Risks

    Directory of Open Access Journals (Sweden)

    Natalya Pavlovna Pazdnikova

    2014-09-01

    Full Text Available The article addresses the implementation of budget risk management methods into the practices of governmental authorities. Drawing on the example of a particular region the article aims to demonstrate the possible methods of budget risk management. The authors refine the existing approaches to the notion of risk in its relation to budget system by introducing the notion of “budget risk.” Here the focus is the risk of default of budget spending in full which causes underfunding of territories and decrease in quality of life in the region. The authors have particularized the classification of budget risks and grouped together the criteria and factors which significantly influence the assessment and choice of method to manage budget risks. They hypothesize that budget risk is a financial risk. Therefore, the methods of financial risks management can be applied to budget risks management. The authors suggest a methodological approach to risk assessment based on correlation and regression analysis of program financing. The application of Kendall rank correlation coefficient allowed to assess the efficiency of budget spending on the implementation of state programs in Perm Krai. Two clusters — “Nature management and infrastructure” and “Public security” — turned out to be in the zone of high budget risk. The method of stress analysis, which consists in calculating Value at Risk (VaR, was applied to budget risks that in terms of probability are classified as critical. In order to assess risk as probability rate, the amount of Perm Krai deficit budget was calculated as induced variable from budget revenues and spending. The results demonstrate that contemporary management of public resources in the regions calls for the implementation of new management tools of higher quality and budget risk management is one of them.

  7. Budget and financing of mental health services: baseline information on 89 countries from WHO's project atlas.

    Science.gov (United States)

    Saxena, Shekhar; Sharan, Pratap; Saraceno, Benedetto

    2003-09-01

    Very little information is available on budget and financing of mental health services in the world. During year 2001, WHO collected information from all countries on resources available for mental health care as a part of Project Atlas. The present report seeks to describe the situation regarding federal budgets and financing of mental health care at the country level. It also examines the association between relative allocation of health budget to mental health and mental health policy, programme and resource indicators in 89 countries. The information was collected through a questionnaire (with an accompanying glossary) that was sent to the mental health focal point in the Ministry of Health of each country. Eighty nine countries provided information on their mental health budget as a proportion of health budget. In addition, information was obtained on policy, programme and mental health resource indicators (beds, personnel, services to special population and availability of drugs). The results showed that 32% of 191 countries did not have a specified budget for mental health. Of the 89 countries that supplied the requisite information 36% spent less than 1% of their total health budget on mental health. Many countries from Africa (79%) and the South East Asia (63%) were in this subgroup. Comparison with the Global Burden of Disease data showed a marked disparity between burden and resources. Lower income countries allocated a lesser proportion of their health budget on mental health in comparison to higher income countries. The primary method of financing mental health care in most countries was tax-based (60.2%), but many low-income countries depended on out-of-pocket expenditure (16.4%). The presence of mental health policies and programmes in general was not associated with the proportion of health budget allocated to mental health. Counties categorized based on the proportion of mental health budget to health budget, differed significantly in terms of

  8. The Budget and Economic Outlook: Fiscal Years 2003-2012

    National Research Council Canada - National Science Library

    Crippen, Dan

    2002-01-01

    .... It satisfies the requirement of section 202(e) of the Congressional Budget Act of 1974 for CBO to submit to the Committees on the Budget periodic reports about fiscal policy and to provide five-year baseline projections of the federal budget...

  9. ROUTING FINANCIAL FLOWS AT THE EXECUTION OF THE MUNICIPALITY BUDGET

    Directory of Open Access Journals (Sweden)

    Mariya V. Fedotova

    2018-05-01

    Full Text Available Economic development of each administrative-territorial unit is an important factor in the economic development of the Russian Federation. In its turn, the effective execution of the budget at each level of the budget system is invariably topical, influencing the development of a system of both centralized and decentralized finance. The paramount characteristic of the organization of the budget execution of the municipality is an ability to ensure the timely and full execution of their commitments. There is a direct correlation of the budget process on both the revenue and expenditure sides. Cash gap in the local budget execution is actually quite common and, usually, inevitable, because revenues are coming unevenly during the financial year, budgetary expenditures are seasonal, and this threatens the execution of planned budgets; there is a need to raise funds. The article deals with the execution of the cash balance plan, cash flow at the single account of budget, debt and source of financing deficits. The analysis of financial flows in the execution of municipalities’ budget shows problems of execution of budget revenues and allows assessing the scale of emerging cash gaps. An outcome of the review consists in the recognition of an objective need to develop approaches to assessing the effectiveness of budget execution at all its stages and to implement the monitoring of the effectiveness of budget execution and timely effective measures for ensuring its high-quality.

  10. Building information modeling in budgeting

    Directory of Open Access Journals (Sweden)

    Strnad, Michal

    2017-12-01

    Full Text Available Construction activity is one of the financially demanding and ever-changing locations of implementation. The basic idea of the budget is to determine all the possible costs that will arise during construction work. The budget must be a transparent and effective way of communication in the context of supplier-customer relationships. For this reason it is essential to give the budget the structure that is now represented by the price system. It is important to adhere to the principles of budgeting and technical standards. It is necessary to have good documentation for budgeting such as project documentation and much more. However, the construction product range is one of the most extensive, the product group can be changed several times in the investment phase not only materially but also cost-effectively because of the longest production cycle in the construction industry.

  11. The Budget and Economic Outlook: Fiscal Years 2001-2010

    National Research Council Canada - National Science Library

    2000-01-01

    .... It satisfies the requirement of section 202(e) of the Congressional Budget Act of 1974 for CBO to submit periodic reports to the Committees on the Budget with respect to fiscal policy and to provide five-year baseline projections of the federal budget...

  12. The Fundamentals of Formation of the State Budget and Tax Policy

    Directory of Open Access Journals (Sweden)

    Pasichniy Mykola D.

    2017-03-01

    Full Text Available The article is aimed at substantiation and development of the theoretical and methodological definitions as to formation of the State budget and tax policy in the current conditions of economic transformations. The issues of developing the directions and measures of fiscal policy in line with the priorities of social and economic development of the country and its administrative-territorial units have been explored. Attention has been focused on the importance of assessing the impacting of the economic growth by not the tax burden only, but the tax structure as well, in the context of the major classifications. The article substantiates the importance of enhancing the efficiency of use of budgetary funds, separation of social and economic efficiency of the budget expenditures. Of particular interest are the issues relating to strengthening of the institutional foundations of the budget and tax policy, implementation of measures for introduction of the medium-term budget planning. Priorities of the budget policy in the sphere of the inter-budgetary relations and regulation of the budget deficit have been allocated.

  13. Execution of local budgets in 2014: tension is not decreasing

    Directory of Open Access Journals (Sweden)

    Anna Ivanovna Povarova

    2015-05-01

    Full Text Available Vladimir Putin’s “May decrees” have received the status of a national goal. On the background of decreasing economic performance exacerbated by external shocks, the implementation of these decrees has become a heavy burden for regional budgets without an adequate financial support from the federal budget. As a result, almost every Russian region has suffered losses by the end of 2014. The fallacy of the ongoing course of budget policy has long been criticized by many leading scholars and experts; moreover, they proposed positive recommendations on the development of alternative policies. Unfortunately, the results of 2014 prove that the RF Government has not abandoned the policy of budget consolidation. On the contrary, gratuitous financial assistance to the regions is actively transformed into debt financing in the form of budget loans. However, the regional authorities can rely on this quasi-support, which is a temporary factor, only provided that the budget is deficit-free and at the expense of abandonment of spending on economic development and on the improvement of welfare of the population. The results of the analysis of the facts indicate that the budget-related problems of the regions, arising largely from the inefficient federal budget policy, have reached the critical level. One fourth of the subjects that had a predominant share of market debt turned out to be in a pre-default state. The breakdown of public finances has affected the most prosperous regions, which is contrary to the paradigm of sustainable regional development. The regions entered the crisis of 2014 with huge debt and budget deficit; the situation was not so grave during the financial and economic crisis of 2009. In terms of the upcoming 10% cut of federal budget expenditures [5], the subjects of the Russian Federation can hardly expect an increase in financial support. They will obviously have to adapt their budgets to the changing economic situation. But in

  14. Sediment Budget Analysis; Masonboro Inlet, North Carolina

    Science.gov (United States)

    2017-08-15

    ER D C/ CH L TR -1 7- 13 Regional Sediment Management (RSM) Program Sediment Budget Analysis; Masonboro Inlet, North Carolina Co as ta...ERDC/CHL TR-17-13 August 2017 Sediment Budget Analysis; Masonboro Inlet, North Carolina Kevin B. Conner U.S. Army Engineer District, Wilmington P...Engineers Washington, DC 20314-1000 Under Project 454632, “Sediment Budget Analysis, Masonboro Inlet, NC” ERDC/CHL TR-17-13 ii Abstract A

  15. ON THE SUSTAINABILITY OF CURRENT ACCOUNT DEFICITS IN CAMEROON

    Directory of Open Access Journals (Sweden)

    Edouard T. Djeutem

    2013-04-01

    Full Text Available Two approaches are used to analyze the sustainability of the current account deficits of Cameroon in order to find out whether current economic policies are sound enough to guarantee the country’ s financial solvency. The first uses a structural procedure to compare current account deficits relative to an optimal benchmark using the Campbell-Shiller’s methodology. The second uses a reduced form approach to test for intertemporal budget constraint through cointegration tests between imports and exports plus net transfer payments on foreign obligations. Our results suggest that the current account imbalances for Cameroon based on data from the period 1970-2002 are “excessive” and the deficits are currently unsustainable.

  16. The Budget and Economic Outlook: Fiscal Years 2006 to 2015

    National Research Council Canada - National Science Library

    Holland, Jeffrey; Blom, Barry; Arnold, Robert; Trimarco, Gerard; Booth, Mark; Hays, Ellen; Russek, Frank; Brauer, David; Futrell, Ann; Smith, Jennifer

    2005-01-01

    .... It satisfies the requirement of section 202(e) of the Congressional Budget Act of 1974 for CBO to submit to the Committees on the Budget periodic reports about fiscal policy and to provide baseline projections of the federal budget...

  17. The groundwater budget: A tool for preliminary estimation of the hydraulic connection between neighboring aquifers

    Science.gov (United States)

    Viaroli, Stefano; Mastrorillo, Lucia; Lotti, Francesca; Paolucci, Vittorio; Mazza, Roberto

    2018-01-01

    Groundwater management authorities usually use groundwater budget calculations to evaluate the sustainability of withdrawals for different purposes. The groundwater budget calculation does not always provide reliable information, and it must often be supported by further aquifer monitoring in the case of hydraulic connections between neighboring aquifers. The Riardo Plain aquifer is a strategic drinking resource for more than 100,000 people, water storage for 60 km2 of irrigated land, and the source of a mineral water bottling plant. Over a long period, the comparison between the direct recharge and the estimated natural outflow and withdrawals highlights a severe water deficit of approximately 40% of the total groundwater outflow. A groundwater budget deficit should be a clue to the aquifer depletion, but the results of long-term water level monitoring allowed the observation of the good condition of this aquifer. In fact, in the Riardo Plain, the calculated deficit is not comparable to the aquifer monitoring data acquired in the same period (1992-2014). The small oscillations of the groundwater level and the almost stable streambed spring discharge allows the presumption of an additional aquifer recharge source. The confined carbonate aquifer locally mixes with the above volcanic aquifer, providing an externally stable recharge that reduces the effects of the local rainfall variability. The combined approach of the groundwater budget results and long-term aquifer monitoring (spring discharge and/or hydraulic head oscillation) provides information about significant external groundwater exchanges, even if unidentified by field measurements, and supports the stakeholders in groundwater resource management.

  18. 7 CFR 1218.50 - Budget and expenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budget and expenses. 1218.50 Section 1218.50 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... budget shall include: (1) A statement of objectives and strategy for each program, plan, or project; (2...

  19. Budget performance reporting and construction work packaging

    International Nuclear Information System (INIS)

    Strong, M.G.; Weyers, L.L.

    1976-01-01

    A changing financial, technological, and regulatory environment has increased the complexity, costliness, and risk involved in constructing new generating facilities. A primary challenge facing utility executives is to hold down costs on these construction projects. New construction management techniques are required to accomplish this. Commonwealth Edison has responded by implementing a new Budget Performance Reporting System and a Construction Work Packaging System. The new systems are being used successfully on four major construction projects with budgets totaling over $4 billion

  20. A CBO Study: The Budget and Economic Outlook: An Update

    National Research Council Canada - National Science Library

    Holtz-Eakin, Douglas

    2003-01-01

    .... It satisfies the requirement of section 202(e) of the Congressional Budget Act of 1974 for CBO to submit to the Committees on the Budget periodic reports about fiscal policy and to provide five-year baseline projections of the federal budget...

  1. 7 CFR 1737.60 - Telephone loan budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Telephone loan budget. 1737.60 Section 1737.60... Cost Estimation Procedures § 1737.60 Telephone loan budget. (a) RUS shall prepare a “Telephone Loan Budget” (RUS Form 493) showing all costs for the proposed project and the amount of loan and nonloan...

  2. Budget Deficit And Public Debt - The Great Challenges For The Eu Member States

    Directory of Open Access Journals (Sweden)

    Lupu, Iulia

    2010-12-01

    Full Text Available The financial crises had a strong impact on the public finance sectors from European countries. Even if in 2007 they started from relative good fiscal positions, the public debt and the budgetary deficits considerably deteriorated and registered historic values in European Union. With all measures taken to stimulate the economy, is a very favourable scenario to return at the taxes level from 2007. The aggregate numbers regarding the deficit and public debt incline to disguise the different evolutions of the European Union member states. The strong deterioration of fiscal indicators is caused by the automat effect of the economic productivity and also by measures taken by the governments of the member states. The past experiences can help to evaluate the fiscal measures that must be adopted in order to reduce the public debt and the deficit, without having an universal solution for all countries. Very important is the existing context for the implementation of adopted measures.

  3. Spatial structures in the heat budget of the Antarctic atmospheric boundary layer

    Directory of Open Access Journals (Sweden)

    W. J. van de Berg

    2008-01-01

    Full Text Available Output from the regional climate model RACMO2/ANT is used to calculate the heat budget of the Antarctic atmospheric boundary layer (ABL. The main feature of the wintertime Antarctic ABL is a persistent temperature deficit compared to the free atmosphere. The magnitude of this deficit is controlled by the heat budget. During winter, transport of heat towards the surface by turbulence and net longwave emission are the primary ABL cooling terms. These processes show horizontal spatial variability only on continental scales. Vertical and horizontal, i.e. along-slope, advection of heat are the main warming terms. Over regions with convex ice sheet topography, i.e. domes and ridges, warming by downward vertical advection is enhanced due to divergence of the ABL wind field. Horizontal advection balances excess warming caused by vertical advection, hence the temperature deficit in the ABL weakens over domes and ridges along the prevailing katabatic wind. Conversely, vertical advection is reduced in regions with concave topography, i.e. valleys, where the ABL temperature deficit enlarges along the katabatic wind. Along the coast, horizontal and vertical advection is governed by the inability of the large-scale circulation to adapt to small scale topographic features. Meso-scale topographic structures have thus a strong impact on the ABL winter temperature, besides latitude and surface elevation. During summer, this mechanism is much weaker, and the horizontal variability of ABL temperatures is smaller.

  4. The AquaDEB project: Physiological flexibility of aquatic animals analysed with a generic dynamic energy budget model (phase II)

    OpenAIRE

    Alunno-bruscia, Marianne; Van Der Veer, Henk; Kooijman, S. A. L. M.

    2011-01-01

    This second special issue of the Journal of Sea Research on development and applications of Dynamic Energy Budget (DEB) theory concludes the European Research Project AquaDEB (2007–2011). In this introductory paper we summarise the progress made during the running time of this 5 years’ project, present context for the papers in this volume and discuss future directions. The main scientific objectives in AquaDEB were (i) to study and compare the sensitivity of aquatic species (mainly molluscs ...

  5. Global Carbon Budget 2017

    NARCIS (Netherlands)

    Le Quere, Corinne; Andrew, Robbie M.; Friedlingstein, Pierre; Sitch, Stephen; Pongratz, Julia; Manning, Andrew C.; Korsbakken, Jan Ivar; Peters, Glen P.; Canadell, Josep G.; Jackson, Robert B.; Boden, Thomas A.; Tans, Pieter P.; Andrews, Oliver D.; Arora, Vivek K.; Bakker, Dorothee C. E.; Barbero, Leticia; Becker, Meike; Betts, Richard A.; Bopp, Laurent; Chevallier, Frederic; Chini, Louise P.; Ciais, Philippe; Cosca, Catherine E.; Cross, Jessica; Currie, Kim; Gasser, Thomas; Harris, Ian; Hauck, Judith; Haverd, Vanessa; Houghton, Richard A.; Hunt, Christopher W.; Hurtt, George; Ilyina, Tatiana; Jain, Atul K.; Kato, Etsushi; Kautz, Markus; Keeling, Ralph F.; Goldewijk, Kees Klein; Koertzinger, Arne; Landschuetzer, Peter; Lefevre, Nathalie; Lenton, Andrew; Lienert, Sebastian; Lima, Ivan; Lombardozzi, Danica; Metzl, Nicolas; Millero, Frank; Monteiro, Pedro M. S.; Munro, David R.; Nabel, Julia E. M. S.; Nakaoka, Shin-ichiro; Nojiri, Yukihiro; Padin, X. Antonio; Peregon, Anna; Pfeil, Benjamin; Pierrot, Denis; Poulter, Benjamin; Rehder, Gregor; Reimer, Janet; Roedenbeck, Christian; Schwinger, Jorg; Seferian, Roland; Skjelvan, Ingunn; Stocker, Benjamin D.; Tian, Hanqin; Tilbrook, Bronte; Tubiello, Francesco N.; van der Laan-Luijkx, Ingrid T.; van der Werf, Guido R.; van Heuven, Steven; Viovy, Nicolas; Vuichard, Nicolas; Walker, Anthony P.; Watson, Andrew J.; Wiltshire, Andrew J.; Zaehle, Soenke; Zhu, Dan

    2018-01-01

    Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere - the "global carbon budget" - is important to better understand the global carbon cycle, support the development of climate policies, and project

  6. Global Carbon Budget 2016

    NARCIS (Netherlands)

    Le Quéré, Corinne; Andrew, Robbie M.; Canadell, Josep G.; Sitch, Stephen; Ivar Korsbakken, Jan; Peters, Glen P.; Manning, Andrew C.; Boden, Thomas A.; Tans, Pieter P.; Houghton, Richard A.; Keeling, Ralph F.; Alin, Simone; Andrews, Oliver D.; Anthoni, Peter; Barbero, Leticia; Bopp, Laurent; Chevallier, Frédéric; Chini, Louise P.; Ciais, Philippe; Currie, Kim; Delire, Christine; Doney, Scott C.; Friedlingstein, Pierre; Gkritzalis, Thanos; Harris, Ian A; Hauck, Judith; Haverd, Vanessa; Hoppema, Mario; Klein Goldewijk, Kees; Jain, Atul K.; Kato, Etsushi; Körtzinger, Arne; Landschützer, Peter; Lefèvre, Nathalie; Lenton, Andrew; Lienert, Sebastian; Lombardozzi, Danica; Melton, Joe R.; Metzl, Nicolas; Millero, Frank; Monteiro, Pedro M S; Munro, David R.; Nabel, Julia E M S; Nakaoka, Shin Ichiro; O'Brien, Kevin; Olsen, Are; Omar, Abdirahman M.; Ono, Tsuneo; Pierrot, Denis; Poulter, Benjamin; Rödenbeck, Christian; Salisbury, Joe; Schuster, Ute; Schwinger, Jörg; Séférian, Roland; Skjelvan, Ingunn; Stocker, Benjamin D.; Sutton, Adrienne J.; Takahashi, Taro; Tian, Hanqin; Tilbrook, Bronte; Van Der Laan-Luijkx, Ingrid T.; Van Der Werf, Guido R.; Viovy, Nicolas; Walker, Anthony P.; Wiltshire, Andrew J.; Zaehle, Sönke

    2016-01-01

    Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere-the "global carbon budget"-is important to better understand the global carbon cycle, support the development of climate policies, and project future

  7. GCIP water and energy budget synthesis (WEBS)

    Science.gov (United States)

    Roads, J.; Lawford, R.; Bainto, E.; Berbery, E.; Chen, S.; Fekete, B.; Gallo, K.; Grundstein, A.; Higgins, W.; Kanamitsu, M.; Krajewski, W.; Lakshmi, V.; Leathers, D.; Lettenmaier, D.; Luo, L.; Maurer, E.; Meyers, T.; Miller, D.; Mitchell, Ken; Mote, T.; Pinker, R.; Reichler, T.; Robinson, D.; Robock, A.; Smith, J.; Srinivasan, G.; Verdin, K.; Vinnikov, K.; Vonder, Haar T.; Vorosmarty, C.; Williams, S.; Yarosh, E.

    2003-01-01

    As part of the World Climate Research Program's (WCRPs) Global Energy and Water-Cycle Experiment (GEWEX) Continental-scale International Project (GCIP), a preliminary water and energy budget synthesis (WEBS) was developed for the period 1996-1999 fromthe "best available" observations and models. Besides this summary paper, a companion CD-ROM with more extensive discussion, figures, tables, and raw data is available to the interested researcher from the GEWEX project office, the GAPP project office, or the first author. An updated online version of the CD-ROM is also available at http://ecpc.ucsd.edu/gcip/webs.htm/. Observations cannot adequately characterize or "close" budgets since too many fundamental processes are missing. Models that properly represent the many complicated atmospheric and near-surface interactions are also required. This preliminary synthesis therefore included a representative global general circulation model, regional climate model, and a macroscale hydrologic model as well as a global reanalysis and a regional analysis. By the qualitative agreement among the models and available observations, it did appear that we now qualitatively understand water and energy budgets of the Mississippi River Basin. However, there is still much quantitative uncertainty. In that regard, there did appear to be a clear advantage to using a regional analysis over a global analysis or a regional simulation over a global simulation to describe the Mississippi River Basin water and energy budgets. There also appeared to be some advantage to using a macroscale hydrologic model for at least the surface water budgets. Copyright 2003 by the American Geophysical Union.

  8. Nigeria's Fiscal Deficits: A History of its Colonial Foundations, 1899 ...

    African Journals Online (AJOL)

    In fact, since the beginning of democratic rule in the current fourth republic, government has increasingly failed to balance its budget with grave consequences for price levels, interest rates, inflation and macroeconomic stability. This paper shows that deficit financing of public expenditure by the Nigerian government is ...

  9. The lending channel and budget balance: empirical evidences from Central and Eastern European economies

    Directory of Open Access Journals (Sweden)

    Bogdan-Gabriel MOINESCU

    2013-03-01

    Full Text Available The study aims to deepen the analysis on the indirect dependence of government budget balance on private sector credit flow in the countries of Central and Eastern Europe. The added value of this approach consists of two elements. First, the analysis suggests developing the traditional analytical framework of assessing risks to public finance stability by including second round effects of negative fiscal impulses on credit to private sector during recession periods. Second, the study provides empirical evidence on the importance of economic growth transmission channel for the impact of credit accelerator effects on primary deficit. At the same time, nonperforming loans channel proved to be insignificant, especially in relation to the persistency of last year’s budget deficit and the effects of budget allocations pro-cyclicality. However, loan portfolio quality seems to be more relevant in the case of public debt service, through its influence on the evolution of the yield on long-term government securities that is closely related to sovereign risk premium. Nevertheless, strengthening the financial safety net by the introduction of resolution funds will most probably break the link investors saw between credit portfolio quality and the impending increase in budget spending. This expected development across not only CEE countries, but at the EU level also, will facilitate the isolation of sovereign risk premium from non-performing loans’ dynamics.

  10. Budget Gamesmanship | Odia | Journal of Research in National ...

    African Journals Online (AJOL)

    Game play in budgeting is not new. They are routine behaviours adopted by managers and subordinates to cope with pressures inherent in the budgetary negation process or deliberate and pre-meditated manipulation of performance variables by managers to project an overtly conservative image into their budget.

  11. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Science.gov (United States)

    2010-07-01

    ... emissions budget. 93.118 Section 93.118 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... and procedures: Motor vehicle emissions budget. (a) The transportation plan, TIP, and project not from a conforming transportation plan and TIP must be consistent with the motor vehicle emissions budget...

  12. Vom "Deficit Accounting" zum "Generational Accounting ": Eine Anwendung für die Schweiz

    OpenAIRE

    Stefan Felder

    1997-01-01

    The stance of fiscal policy is commonly assessed by the size of the annual budget deficit and public debt. Both indices fail, however, to correctly reflect the long run financial burden of government programs such as social security. An alternative to "deficit accounting" is "generational accounting" which in particular reveals the intergenerational distribution effect of government legislation. The present paper applies generational accounting on the pay-as-you-go financed part of old age pe...

  13. Does National Culture Impact Capital Budgeting Systems?

    Directory of Open Access Journals (Sweden)

    Peter J. Graham

    2017-06-01

    Full Text Available We examine how national culture impacts organisational selection of capital budgeting systems to develop our understanding of what influence a holistic formulation of national culture has on capital budgeting systems. Such an understanding is important as it would not only provide a clearer link between national culture and capital budgeting systems and advance extant literature but would also help multinational firms that have business relationships with Indonesian firms in suitably designing strategies. We conducted semi-structured interviews of selected finance managers of listed firms in Indonesia and Australia. Consistent with the contingency theory, we found that economic, political, legal and social uncertainty impact on the use of capital budgeting systems. The levels of uncertainty were higher in Indonesia than Australia and need to be reckoned in the selection of capital budgeting systems used by firms. We also found that firms are influenced by project size and complexity, when selecting capital budgeting systems.

  14. Capital budgeting practices used by selected listed South African firms

    Directory of Open Access Journals (Sweden)

    John Hall

    2011-05-01

    Full Text Available This article investigates the application of capital budgeting techniques and the incorporation of risk into the capital budgeting process among a sample of South African industrial firms listed on the JSE Securities Exchange for at least ten years. Previous international and local research on this topic indicated a preference for the internal rate of return (IRR as a capital budgeting method over the net present value (NPV, and that risk incorporation was relatively rarely incorporated into the capital budgeting process. The results of this study indicate that the NPV is just as popular as, and sometimes more so than, the IRR. Furthermore, compared to previous studies, risk is incorporated into evaluating capital budgeting projects more often. Sensitivity analysis is the most popular method, but adjustments to the cash flows and discount rate are becoming more popular. During the last decade the use of non-financial criteria to accept or reject a project has also increased in South Africa.

  15. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  16. 7 CFR 3402.14 - Budget and budget narrative.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Budget and budget narrative. 3402.14 Section 3402.14... GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.14 Budget and budget narrative. Applicants must prepare the Budget, Form CSREES-2004, and a budget narrative...

  17. Proposed budget cuts threaten to short-circuit Grid network

    CERN Multimedia

    Butler, D

    2001-01-01

    Changes to the budget for the European sixth Framework programme may jeapardize the Grid project. The EU Parliament have asked to cut the budget for infrastructure to 500 million euros from 900 and of this 150 million will probably be allocated to Ge the pan-European research network (1 page).

  18. THE REAL OPTIONS OF CAPITAL BUDGET

    Directory of Open Access Journals (Sweden)

    Antonio Lopo Martins

    2008-07-01

    Full Text Available The traditional techniques of capital budget, as the deducted cash flow and the net value present, do not incorporate existing flexibilities in an investment project, they tend to distort the value of certain investments, mainly those that are considered in scenes of uncertainty and risk. Therefore, this study intends to demonstrate that the Real Options Theory (TOR is a useful methodology to evaluate and to indicate the best option for project of expansion investment. To reach the considered objective the procedure method was used a case study, having as unit of case the Resort Praia Hotel do Litoral Norte of Salvador. This study was developed of the following form: first it identified the traditional net value present and later it was incorporated the volatileness of each analyzed uncertainty. Second, as the real options are analogous to the financial options, it was necessary to identify elements that composed the terminologies of the financial options with intention to get the value of the real option. For this model of options pricing of Black & Scholes jointly with a computational simulator was used (SLS to get the expanded net value present. As a result of this study it was possible to evidence that using the traditional tool of capital budget Net Value Present (VPL is negative, therefore the project of expansion of the Hotel would be rejected. While for the application of methodology TOR the project presents positive Expanded Present Value which would represent an excellent chance of investment. Key-word: Capital budget, Real options, Analysis of investments.

  19. The oceanic fixed nitrogen and nitrous oxide budgets: Moving targets as we enter the anthropocene?

    Digital Repository Service at National Institute of Oceanography (India)

    Codispoti, L; Brandes, J.A.; Christensen, J.P.; Devol, A.H.; Naqvi, S.W.A.; Paerl, H.W.; Yoshinari, T.

    New data forced to raise previous estimates of oceanic denitrification. The revised estimate of approx. 450 Tg N yr sup(-1) (Tg = 10 sup(12) g) produces an oceanic fixed N budget with a large deficit (approx. 200 Tg N yr sup(1)) that can...

  20. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  1. 45 CFR 2543.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  2. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  3. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  4. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  5. Principles of Forming the State Budget of Ukraine: Process and System Approach

    Directory of Open Access Journals (Sweden)

    Zakhozhay Kostyantyn V.

    2017-09-01

    Full Text Available The aim of the article is considering the theoretical and methodological instruments of the State Budget of Ukraine and in view of this providing a more extended characteristic of the principles of the budget system, taking into account the role of the country’s main financial plan at five classical levels of economy. As a result of the research, there determined the necessity of supplementing the legislatively approved principles of the State Budget of Ukraine with the newly introduced principles of economic security and social protection of the population. In order to improve the theoretical and methodological instruments of the State Budget of Ukraine and the visibility of its impact on socio-economic processes under current conditions of the society development as well as to determine its role in the socio-economic space, it is suggested to consider the role of the main financial plan for mega-, macro-, meso-, micro- and nano-levels. Further practical application of the introduced principles of forming the State Budget of Ukraine on the basis of the process and system approach will enable development of many sectors of the national economy; increase the flow of investment; promote political stability; reduce the inflation, unemployment; increase production and exports; reduce the budget deficit and public debt; affect the increase in the financial potential and gold reserves of the state.

  6. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It may...

  7. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  8. Monitoring health spending increases: incremental budget analyses reveal challenging tradeoffs.

    Science.gov (United States)

    Hartman, Micah; Smith, Cynthia; Heffler, Stephen; Freeland, Mark

    2006-01-01

    With each passing decade, health care has consumed a larger share of gross domestic product (GDP) and Federal budgets. By the 2000-2004 period, society was willing to devote over 20 percent of the cumulative increase in GDP and the cumulative increase in Federal outlays towards health care. The financing challenges are expected to become more acute for private payers as well as Federal, State, and local budgets. With the implementation of Part D in 2006, the U.S. Office of Management and Budget projects that Federal budget pressures will heighten, bringing increased attention to Medicare's long-term fiscal outlook.

  9. Gender-responsive budgeting in Africa: An action learning project in ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... budgeting is devoted to analyzing performance by gender in a few sectors. ... IDRC congratulates first cohort of Women in Climate Change Science Fellows ... Special journal issue highlights IDRC-supported findings on women's paid work.

  10. Centralization versus Delegation in an Experimental Capital Budgeting Setting

    Directory of Open Access Journals (Sweden)

    Markus C. Arnold

    2011-04-01

    Full Text Available In an experiment, we model two stylized facts about capital budgeting practice, budgetary slack creation and delegation of decision-making authority. In our setting, under centralization, headquarters announces a budget, the division manager gives a cost report, and headquarters decides on the project. Under delegation, headquarters allocates a budget to the manager, and the manager is authorized to make the investment decision. We argue that the ability of headquarters to commit to a budget moderates the effect of delegation, and we find evidence in favor of our argument as there is an interaction effect of delegation and commitment to budgets. The effects of delegation are particularly strong when budgets are non-binding as delegation serves as a substitute for commitment in this case. This leads to smaller expenditures and to a higher headquarters’ payoff under delegation than under centralization. In contrast, when headquarters can commit to the budget, the descriptive data are consistent with our conjectures about the effects of honesty preferences, but the effects are too small to be significant.

  11. BASES OF PUBLIC POLICY FORMATION DIRECTED AT ENSURING BUDGET SECURITY

    Directory of Open Access Journals (Sweden)

    S. Onishchenko

    2015-03-01

    Full Text Available In the article the priorities and public policies that can improve the safety level of the budget of Ukraine have been grounded. Attention on the problems of imbalance and deficiency trends accumulation of public debt has been focused. The detailed analysis of the budget deficit of the European community to further research the main problems of fiscal security has been carried out. The formation of the concept of budget policy should include long-term and medium-term priorities of the state priorities areas have been concluded. Budget policy on public debt must deal with interrelated issues of debt bondage and effective use of public credit, promote economic growth with respect safe level and structure of public debt have been emphasized by author. Debt policy as part of fiscal policy under certain conditions can be a powerful tool to intensify investment and innovation processes in society, promote economic and social development. The reorientation of fiscal policy to address current problems through debt and use it as the basis of investment and innovation development provides an effective public debt management is designed to reduce state budget expenditures on its servicing and repayment, optimizing the scope and structure of debt according to economic growth. The role of debt policy in modern terms increases is clearly subordinate to and consistent with long-term goals and priorities of fiscal policy. There is an urgent development and implementation of effective mechanisms for investing borrowed resources, increasing the efficiency of public investment, including the improvement of organizational, financial, legal and controls. Strategically budget security guarantees only competitive economy, which can be constructed only by recovery and accelerated development of promising sectors of the national economy in the presence of a balanced budget policy. Now there is a tendency to implement only measures to stabilize the political and socio

  12. The 2013 Long-Term Budget Outlook

    Science.gov (United States)

    2013-09-01

    number of years, leading to substantial additional federal spending. For example, the nation could experience a massive earthquake, a nuclear meltdown...budget surpluses remaining after paying down publicly held debt available for redemption . a. For comparison with the current long-term projections, CBO

  13. Public Budget Database - Governmental receipts 1962-Current

    Data.gov (United States)

    Executive Office of the President — This file contains governmental receipts for 1962 through the current budget year, as well as four years of projections. It can be used to reproduce many of the...

  14. Budgetary cash flows in the EU and their impact on national budget liquidity: the case of Slovenia

    Directory of Open Access Journals (Sweden)

    Tanja Markovič Hribernik

    2005-12-01

    Full Text Available On May 1, 2004 ten new states joined the EU. At the same time, budgetary cash flow mechanisms between the EU budget (as the central subject and national budgets were established. Despite the fact that all the rules are clear and known in advance - stipulated by the EU directives and regulations - there are some uncertainties, which may have an important effect on the liquidity as well as on the budgetary cash flows in new member states. The greatest problem for the liquidity of new member states’ budgets is posed by the time lags between inflows and outflows of EU funds. These lags are mainly because of delayed payments from the EU budget and problems with some member state’s absorption capacity. This article deals with the dynamics and the scale of budgetary cash flows between the Slovenian budget and the EU budget until 2006. A couple of likely scenarios are presented, which could happen in case of delayed payments of European funds. Consequently, both an unexpected state budget liquidity deficit and an additional burden arising from interest on delayed payments to the Brussels are possible for Slovenia.

  15. Agency problems in hospitals participating in self-management project under global budget system in Taiwan.

    Science.gov (United States)

    Yan, Yu-Hua; Hsu, Shuofen; Yang, Chen-Wei; Fang, Shih-Chieh

    2010-02-01

    The main purposes of this study are to clarify the agency problems in the hospitals participating in self-management project within the context of Global Budgeting Payment System regulated by Taiwan government, and also to provide some suggestions for hospital administrator and health policy maker in reducing the waste of healthcare resources resulting from agency problems. For the purposes above, this study examines the relationships between two agency problems (ex ante moral hazard and ex post moral hazard) aroused among the hospitals and Bureau of National Health Insurance in Taiwan's health care sector. This study empirically tested the theoretical model at organization level. The findings suggest that the hospital's ex ante moral hazards before participating the self-management project do have some influence on its ex post moral hazards after participating the self-management project. This study concludes that the goal conflict between the agents and the principal certainly exist. The principal tries hard to control the expenditure escalation and keep the financial balance, but the agents have to subsist within limited healthcare resources. Therefore, the agency cost would definitely occur due to the conflicts between both parties. According to the results of the research, some suggestions and related management concepts were proposed at the end of the paper.

  16. OPTIMIZING LOCAL BUDGET BALANCING IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Gyorgy Adina Crsitina

    2011-07-01

    Full Text Available The importance of the local public finance is growing in accordance with the increasing proportion of the decentralization process. The mechanism of resource allocation, and especially the allocation criteria used, constitutes subjects of debate. Our objective pursued is to assess whether the avoidance of the first step for balancing the allocation of funds can provide enhanced fairness in balancing the local budgets across the country. Local budgets in Romania receive significant resources from the state budget in the form of amounts and quotas distributed from certain taxes, which are revenues for the state budget. Some of these amounts are designed to balance the local budgets. The distribution of funds from the state budget to the local budgets requires two steps. Firstly, the amounts are divided by county, secondly, these amounts are directed within the county especially towards localities which have a lower financial standing. Given the significant disparities between counties, we believe that this mechanism does not ensure fairness in the allocation because the funds distributed according to the first step may not use fair criteria to meet the requirements for balanced local budgets. Therefore, we intend to simulate a balanced allocation of national funds for eliminating the first step that produces the most significant inequities. Direct application of the second step of allocation, with its two phases, will provide more funds serving those local administrative units for the income tax per capita is lower than the national average. Comparing the values allocated for the year 2011 with those obtained in the simulation we will examine changes that occur after the application of this method which seems to be more equitable and appropriate. This work was supported by CNCSISUEFISCSU, project number PNII-IDEI 1780/2008

  17. A New Approach in Public Budgeting: Citizens' Budget

    Science.gov (United States)

    Bilge, Semih

    2015-01-01

    Change and transformation in the understanding and definition of citizenship has led to the emergence of citizen-oriented public service approach. This approach also raised a new term and concept in the field of public budgeting because of the transformation in the processes of public budgeting: citizens' budget. The citizens' budget which seeks…

  18. FY 1996 Congressional budget request: Budget highlights

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    The FY 1996 budget presentation is organized by the Department`s major business lines. An accompanying chart displays the request for new budget authority. The report compares the budget request for FY 1996 with the appropriated FY 1995 funding levels displayed on a comparable basis. The FY 1996 budget represents the first year of a five year plan in which the Department will reduce its spending by $15.8 billion in budget authority and by $14.1 billion in outlays. FY 1996 is a transition year as the Department embarks on its multiyear effort to do more with less. The Budget Highlights are presented by business line; however, the fifth business line, Economic Productivity, which is described in the Policy Overview section, cuts across multiple organizational missions, funding levels and activities and is therefore included in the discussion of the other four business lines.

  19. 3D modeling of satellite spectral images, radiation budget and energy budget of urban landscapes

    Science.gov (United States)

    Gastellu-Etchegorry, J. P.

    2008-12-01

    DART EB is a model that is being developed for simulating the 3D (3 dimensional) energy budget of urban and natural scenes, possibly with topography and atmosphere. It simulates all non radiative energy mechanisms (heat conduction, turbulent momentum and heat fluxes, water reservoir evolution, etc.). It uses DART model (Discrete Anisotropic Radiative Transfer) for simulating radiative mechanisms: 3D radiative budget of 3D scenes and their remote sensing images expressed in terms of reflectance or brightness temperature values, for any atmosphere, wavelength, sun/view direction, altitude and spatial resolution. It uses an innovative multispectral approach (ray tracing, exact kernel, discrete ordinate techniques) over the whole optical domain. This paper presents two major and recent improvements of DART for adapting it to urban canopies. (1) Simulation of the geometry and optical characteristics of urban elements (houses, etc.). (2) Modeling of thermal infrared emission by vegetation and urban elements. The new DART version was used in the context of the CAPITOUL project. For that, districts of the Toulouse urban data base (Autocad format) were translated into DART scenes. This allowed us to simulate visible, near infrared and thermal infrared satellite images of Toulouse districts. Moreover, the 3D radiation budget was used by DARTEB for simulating the time evolution of a number of geophysical quantities of various surface elements (roads, walls, roofs). Results were successfully compared with ground measurements of the CAPITOUL project.

  20. Importance of measuring discharge and sediment transport in lesser tributaries when closing sediment budgets

    Science.gov (United States)

    Griffiths, Ronald E.; Topping, David J.

    2017-11-01

    Sediment budgets are an important tool for understanding how riverine ecosystems respond to perturbations. Changes in the quantity and grain size distribution of sediment within river systems affect the channel morphology and related habitat resources. It is therefore important for resource managers to know if a river reach is in a state of sediment accumulation, deficit or stasis. Many sediment-budget studies have estimated the sediment loads of ungaged tributaries using regional sediment-yield equations or other similar techniques. While these approaches may be valid in regions where rainfall and geology are uniform over large areas, use of sediment-yield equations may lead to poor estimations of loads in regions where rainfall events, contributing geology, and vegetation have large spatial and/or temporal variability. Previous estimates of the combined mean-annual sediment load of all ungaged tributaries to the Colorado River downstream from Glen Canyon Dam vary by over a factor of three; this range in estimated sediment loads has resulted in different researchers reaching opposite conclusions on the sign (accumulation or deficit) of the sediment budget for particular reaches of the Colorado River. To better evaluate the supply of fine sediment (sand, silt, and clay) from these tributaries to the Colorado River, eight gages were established on previously ungaged tributaries in Glen, Marble, and Grand canyons. Results from this sediment-monitoring network show that previous estimates of the annual sediment loads of these tributaries were too high and that the sediment budget for the Colorado River below Glen Canyon Dam is more negative than previously calculated by most researchers. As a result of locally intense rainfall events with footprints smaller than the receiving basin, floods from a single tributary in semi-arid regions can have large (≥ 10 ×) differences in sediment concentrations between equal magnitude flows. Because sediment loads do not

  1. Budget projections - 1991 through 1996 for research in high energy physics

    International Nuclear Information System (INIS)

    1991-05-01

    This research program in high energy physics is carried out under the general supervision of a committee which is composed of G.W. Brandenburg, G.J. Feldman, M.E. Franklin, R.J. Glauber, K. Kinoshita, F.M. Pipkin, K. Strauch, R. Wilson, and H. Yamamoto. Professor G.J. Feldman currently serves as chair of this committee. Dr. Brandenburg is the Director of the High Energy Physics Laboratory and administers the DOE high energy physics contract. In the fall of 1991 S. Mishra will join this committee. Harvard is planning to make one or two additional senior faculty appointments in experimental high energy physics over the next two years. The principal goals of the work described here are to carry out forefront programs in high energy physics research and to provide first rate educational opportunities for students. The experimental program supported through HEPL is carried out at the major accelerator centers in the world and addresses some of the most important questions in high energy physics. Harvard's educational efforts are concentrated in graduate education, where they are currently supporting thirteen research students. In addition, undergraduate students work in projects at HEPL during the academic year and over summers. These budget projections cover all of the Harvard based high energy physics experimental activities. The open-quotes umbrellaclose quotes nature of this contract greatly simplifies support of essential central technical and computer services and helps the group to take advantage of new physics opportunities and to respond to unexpected needs. The funding for the operation of the HEPL facility is shared proportionally by the experimental groups. Harvard financially supports this high energy physics research program in many ways

  2. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  3. TENDENCIES IN THE DEVELOPMENT OF BUDGET REVENUES UNDER THE IMPACT OF TAX POLICY OF ROMANIA

    Directory of Open Access Journals (Sweden)

    DOBROTĂ GABRIELA

    2016-10-01

    Full Text Available Currently, the need to ensure sustainable development has become a central point of debates and of the economic policies. Obviously, the influence of the level of financial resources mobilized at the state level is crucial, reason for it is necessary to promote a sustainable fiscal policy. The purpose of this paper is to analyze the influence of fiscal policy measures on budget revenues, in terms of volume and their structure in Romania. Empirical researchs realised, reflected a longitudinal study that targeted budget income trends between 2006-2015, both in terms of total volume and in terms of revenues for each category of taxation. The results of this study demonstrate the use of a pro-cyclical fiscal policy, with negative effects in terms of the impact on the budget deficit and a poor correlation with other components of macroeconomic policy.

  4. Under Secretary of Defense (Comptroller) > Budget Materials > Budget1998

    Science.gov (United States)

    functionalStatements OUSD(C) History FMR Budget Materials Budget Execution Financial Management Improving Financial Performance Reports Regulations banner DoD Budget Request 2019 | 2018 | 2017 |2016 | 2015 | 2014 | 2013 | 2012 President's Budget request for the Department of Defense sustains the President's commitment to invest in

  5. Global carbon budget 2013

    International Nuclear Information System (INIS)

    Le Quere, C.; Moriarty, R.; Jones, S.D.; Boden, T.A.; Peters, G.P.; Andrew, R.M.; Andres, R.J.; Ciais, P.; Bopp, L.; Maignan, F.; Viovy, N.

    2014-01-01

    Accurate assessment of anthropogenic carbon dioxide (CO 2 ) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere is important to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe data sets and a methodology to quantify all major components of the global carbon budget, including their uncertainties, based on the combination of a range of data, algorithms, statistics and model estimates and their interpretation by a broad scientific community. We discuss changes compared to previous estimates, consistency within and among components, alongside methodology and data limitations. CO 2 emissions from fossil-fuel combustion and cement production (EFF) are based on energy statistics, while emissions from land-use change (ELUC), mainly deforestation, are based on combined evidence from land-cover change data, fire activity associated with deforestation, and models. The global atmospheric CO 2 concentration is measured directly and its rate of growth (GATM) is computed from the annual changes in concentration. The mean ocean CO 2 sink (SOCEAN) is based on observations from the 1990's, while the annual anomalies and trends are estimated with ocean models. The variability in SOCEAN is evaluated for the first time in this budget with data products based on surveys of ocean CO 2 measurements. The global residual terrestrial CO 2 sink (SLAND) is estimated by the difference of the other terms of the global carbon budget and compared to results of independent dynamic global vegetation models forced by observed climate, CO 2 and land cover change (some including nitrogen-carbon interactions). All uncertainties are reported as ±1, reflecting the current capacity to characterise the annual estimates of each component of the global carbon budget. For the last decade available (2003-2012), EFF was 8.6±0.4 GtC yr -1 , ELUC 0.9±0.5 GtC yr -1 , GATM 4.3±0

  6. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  7. 1985 nuclear budget requests up 12 %

    International Nuclear Information System (INIS)

    Anon.

    1984-01-01

    The estimates of government agencies for the fiscal 1985 nuclear-related budget were presented to the Ministry of Finance, which amount to 343.76 billion yen (up 12.1 %). The budgetary requests by the Science and Technology Agency are 179.24 billion yen in the general account and 90.21 billion yen in the special account for power resource development, and the budgetary requests by the Ministry of International Trade and Industry are 1.03 billion yen and 70.08 billion yen, respectively. The budget demands by the STA, which supervises Power Reactors and Nuclear Fuel Development Corporation, Japan Atomic Energy Research Institute, etc. are for the continuation of current projects, including the beginning of the construction of the prototype FBR Monju and the neutral beam injector for the fusion device JT-60. The budget demands by MITI are similarly for the safety measures and verification tests for nuclear power generation. (Mori, K.)

  8. Voting behavior and budget stability

    Directory of Open Access Journals (Sweden)

    Cristina Vicente

    2013-06-01

    Full Text Available The aim of this paper is to analyze how the implementation of the Budgetary Stability Law has affectedPolitical Budget Cycles generated by Spanish local governments. Specifically, we study whether the evolutionof debt, budget deficit, capital spending and current spending over the electoral cycle has changed after theintroduction of this law. We use a sample of 132 Spanish municipalities with more than 50,000 inhabitants(including the provincial capitals during the period 1995‑2009. Our results show that the Budgetary StabilityLaw has avoided electoral cycles in debt. On the contrary, the adoption of this law has not mitigated theincumbents’ incentives to manipulate deficit, capital spending and current spending with electoral aims.Nevertheless, it has caused a change in the way in which mayors manipulate fiscal policy over the electoralcycle. The opportunistic expansion covered both preelectoral year and the electoral year before theimplementation of this fiscal rule, while after that, deficit and spending increases are confined in the electionyear.En este trabajo analizamos la influencia de la entrada en vigor de la Ley de Estabilidad Presupuestaria en losCiclos Políticos Presupuestarios generados por los gobiernos locales españoles. En concreto, estudiamos si laevolución de la deuda, del déficit, del gasto de capital y del gasto corriente a lo largo del ciclo electoral se havisto modificada tras la introducción de dicha ley. Para ello utilizamos una muestra formada por132 municipios españoles con más de 50.000 habitantes (incluidas las capitales de provincia durante elperiodo 1995‑2009. Nuestros resultados muestran que la Ley de Estabilidad Presupuestaria ha evitado lacreación de Ciclos Políticos Presupuestarios en la deuda. Por el contrario, la aprobación de dicha ley noha atenuado los incentivos de los políticos para manipular el déficit, el gasto de capital y el gasto corriente conla finalidad de permanecer en el poder

  9. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  10. Louisiana DOTD maintenance budget allocation system: final report.

    Science.gov (United States)

    2002-11-01

    This project developed a computer system to assist Louisiana Department of Transportation and Development (LA DOTD) maintenance managers in the preparation of zero-based, needs-driven annual budget plans for routine maintenance. This includes pavemen...

  11. Budget Options

    National Research Council Canada - National Science Library

    2000-01-01

    This volume-part of the Congressional Budget Office's (CBO's) annual report to the House and Senate Committees on the Budget-is intended to help inform policymakers about options for the federal budget...

  12. The Budget Mechanism for the Socio-Economic Development of Country

    Directory of Open Access Journals (Sweden)

    Gavrilova Lidia V.

    2017-11-01

    Full Text Available The article is aimed at studying the relationships between the efficiency of the budget policy and the socio-economic development of country, assessment of the implementation of expenditures of the consolidated budget of Ukraine for financing certain programs of social development. It has been found that economic growth is possible due to the development of both the real sector of the economy and the budgetary support of projects in the sphere of health, education and culture. An important criterion for the success of the budget policy is also the level of accessibility of the public services contributing to the productive economic activity. A systemic instrument for implementation of budget policy is the program-target method, which allows to assess achievements of concrete results at all stages of budget process. It is based on the budget programs, which represent a complex of interrelated tasks and activities aimed at solving the most important problems of development of the State, individual branches of economy, and administrative-territorial units.

  13. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs - FY 2008 Budget Request

    Energy Technology Data Exchange (ETDEWEB)

    2007-03-01

    This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2008 Budget Request. EERE estimates benefits for its overall portfolio and for each of its nine Research, Development, Demonstration, and Deployment (RD3) programs. Benefits for the FY 2008 budget request are estimated for the midterm (2008-2030) and long term (2030-2050).

  14. Dependent-Chance Programming Models for Capital Budgeting in Fuzzy Environments

    Institute of Scientific and Technical Information of China (English)

    LIANG Rui; GAO Jinwu

    2008-01-01

    Capital budgeting is concerned with maximizing the total net profit subject to budget constraints by selecting an appropriate combination of projects. This paper presents chance maximizing models for capital budgeting with fuzzy input data and multiple conflicting objectives. When the decision maker sets a prospec-tive profit level and wants to maximize the chances of the total profit achieving the prospective profit level, a fuzzy dependent-chance programming model, a fuzzy multi-objective dependent-chance programming model, and a fuzzy goal dependent-chance programming model are used to formulate the fuzzy capital budgeting problem. A fuzzy simulation based genetic algorithm is used to solve these models. Numerical examples are provided to illustrate the effectiveness of the simulation-based genetic algorithm and the po-tential applications of these models.

  15. 7 CFR 1216.50 - Budget and expenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budget and expenses. 1216.50 Section 1216.50 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... statement of objectives and strategy for each program, plan, or project; (2) A summary of anticipated...

  16. 7 CFR 1212.50 - Budget and expenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budget and expenses. 1212.50 Section 1212.50 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... objectives and strategy for each program, plan, or project; (2) A summary of anticipated revenue, with...

  17. The Budget as a Management Tool: Zero Base Budgeting, Panacea ...

    African Journals Online (AJOL)

    Nigeria has been experiencing difficulties in Budget implementation. The objective of this article is to present alternative forms of budgeting and after exposition on them, to recommend one that could mitigate budget implementation problem for Nigeria. Two types of budgeting addressed are incremental and zero-base.

  18. Nuclear science: Information on DOE accelerators should be better disclosed in the budget

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    GAO estimated the total cost of six of the Department of Energy's largest accelerator projects to be about $6.9 billion. DOE has identified only about $0.6 billion of these project-specific costs in the budget. This is because DOE's definition of a project relates only to construction, which excludes certain project-specific components and preconstruction research and development. In addition, DOE funds a project in stages over a number of years and does not, when the first stage is authorized, identify for the Congress the total cost of completing the project. DOE also does not fully disclose in its budget technical uncertainties associated with the performance of certain accelerator components because its internal operating procedures do not require such disclosure. This could result in cost overruns or increased operating costs.

  19. Global Carbon Budget 2017

    Science.gov (United States)

    Le Quéré, Corinne; Andrew, Robbie M.; Friedlingstein, Pierre; Sitch, Stephen; Pongratz, Julia; Manning, Andrew C.; Korsbakken, Jan Ivar; Peters, Glen P.; Canadell, Josep G.; Jackson, Robert B.; Boden, Thomas A.; Tans, Pieter P.; Andrews, Oliver D.; Arora, Vivek K.; Bakker, Dorothee C. E.; Barbero, Leticia; Becker, Meike; Betts, Richard A.; Bopp, Laurent; Chevallier, Frédéric; Chini, Louise P.; Ciais, Philippe; Cosca, Catherine E.; Cross, Jessica; Currie, Kim; Gasser, Thomas; Harris, Ian; Hauck, Judith; Haverd, Vanessa; Houghton, Richard A.; Hunt, Christopher W.; Hurtt, George; Ilyina, Tatiana; Jain, Atul K.; Kato, Etsushi; Kautz, Markus; Keeling, Ralph F.; Klein Goldewijk, Kees; Körtzinger, Arne; Landschützer, Peter; Lefèvre, Nathalie; Lenton, Andrew; Lienert, Sebastian; Lima, Ivan; Lombardozzi, Danica; Metzl, Nicolas; Millero, Frank; Monteiro, Pedro M. S.; Munro, David R.; Nabel, Julia E. M. S.; Nakaoka, Shin-ichiro; Nojiri, Yukihiro; Padin, X. Antonio; Peregon, Anna; Pfeil, Benjamin; Pierrot, Denis; Poulter, Benjamin; Rehder, Gregor; Reimer, Janet; Rödenbeck, Christian; Schwinger, Jörg; Séférian, Roland; Skjelvan, Ingunn; Stocker, Benjamin D.; Tian, Hanqin; Tilbrook, Bronte; Tubiello, Francesco N.; van der Laan-Luijkx, Ingrid T.; van der Werf, Guido R.; van Heuven, Steven; Viovy, Nicolas; Vuichard, Nicolas; Walker, Anthony P.; Watson, Andrew J.; Wiltshire, Andrew J.; Zaehle, Sönke; Zhu, Dan

    2018-03-01

    Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere - the global carbon budget - is important to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe data sets and methodology to quantify the five major components of the global carbon budget and their uncertainties. CO2 emissions from fossil fuels and industry (EFF) are based on energy statistics and cement production data, respectively, while emissions from land-use change (ELUC), mainly deforestation, are based on land-cover change data and bookkeeping models. The global atmospheric CO2 concentration is measured directly and its rate of growth (GATM) is computed from the annual changes in concentration. The ocean CO2 sink (SOCEAN) and terrestrial CO2 sink (SLAND) are estimated with global process models constrained by observations. The resulting carbon budget imbalance (BIM), the difference between the estimated total emissions and the estimated changes in the atmosphere, ocean, and terrestrial biosphere, is a measure of imperfect data and understanding of the contemporary carbon cycle. All uncertainties are reported as ±1σ. For the last decade available (2007-2016), EFF was 9.4 ± 0.5 GtC yr-1, ELUC 1.3 ± 0.7 GtC yr-1, GATM 4.7 ± 0.1 GtC yr-1, SOCEAN 2.4 ± 0.5 GtC yr-1, and SLAND 3.0 ± 0.8 GtC yr-1, with a budget imbalance BIM of 0.6 GtC yr-1 indicating overestimated emissions and/or underestimated sinks. For year 2016 alone, the growth in EFF was approximately zero and emissions remained at 9.9 ± 0.5 GtC yr-1. Also for 2016, ELUC was 1.3 ± 0.7 GtC yr-1, GATM was 6.1 ± 0.2 GtC yr-1, SOCEAN was 2.6 ± 0.5 GtC yr-1, and SLAND was 2.7 ± 1.0 GtC yr-1, with a small BIM of -0.3 GtC. GATM continued to be higher in 2016 compared to the past decade (2007-2016), reflecting in part the high fossil emissions and the small SLAND

  20. Do budget balance rules anchor budget balance expectations? -- Some international evidence

    OpenAIRE

    Rülke, Jan-Christoph; Frenkel, Michael; Lis, Eliza

    2013-01-01

    This is the first study that analyzes whether budget balance expectations are anchored and whether budget balance rules effectively anchor expectations. To this end, we use a unique data set which covers budget balance expectations in 17 countries that implemented a budget balance rules. While our results are mixed concerning the general impact of budget balance rules on anchoring expectations, we do find that specific features of budget balance rules are important to successfully anchor budg...

  1. Public Budget Database - Outlays and offsetting receipts 1962-Current

    Data.gov (United States)

    Executive Office of the President — This file contains historical outlays and offsetting receipts for 1962 through the current budget year, as well as four years of projections. It can be used to...

  2. Is Zero-Based Budgeting Different from Planning--Programming--Budgeting Systems?

    Science.gov (United States)

    Hentschke, Guilbert C.

    1977-01-01

    Successful adoption of zero-base budgeting (ZBB) will be greater than that of planning-programming-budgeting-systems (PPBS) because perceived problems inherent in PPBS are largely missing in ZBB; ZBB appears to fit current school district budgeting behavior; and ZBB seems to improve communication about the need for budget reform. (Author/IRT)

  3. The advancement of regulation fee, budget system, and set-up time management

    Energy Technology Data Exchange (ETDEWEB)

    Jung, J. S.; Choi, E. S.; Cho, J. I.; Jung, S. C.; Lee, J. H. [Caleb and Company, Seoul (Korea, Republic of)

    2001-07-15

    Analyze the government's charging fee amendment and suggest the national regulation fee system. Suggest the future business portfolio based in the current business analysis. Design the advanced budget code structure, the performance management of the project budget and the survice level agreement between divisions. Develop the time management and the methodology of the standard man-hour calculation.

  4. Fiscal year 2013 energy department budget: Proposed investments in clean energy research

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Energy and environmental research programs generally fared well in President Barack Obama's proposed budget for the Department of Energy (DOE) for fiscal year (FY) 2013. In his State of the Union address, Obama called for the United States to pursue an "all of the above" energy strategy that includes fossil fuels, as well as a variety of renewable sources of energy. The DOE budget request supports that strategy, Energy Secretary Steven Chu said in a 13 February press briefing announcing the budget proposal. The proposed budget gives DOE 27.2 billion overall, a 3.2% increase from the FY 2012 enacted budget (see Table 1). This budget "reflects some tough choices," Chu said. The proposed budget would cut 4 billion in subsidies for oil and gas companies; many Republican members of Congress have already indicated that they oppose such cuts, suggesting that congressional approval of this budget may run into stumbling blocks. The budget would also cut funding for research and development projects that are already attracting private-sector investment or that are not working, and would reduce some of the department's operational costs.

  5. 2 CFR 215.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... option, restrict the transfer of funds among direct cost categories or programs, functions and activities... scope or the objective of the project or program. (2) The need arises for additional Federal funds to... program or budget related reasons. (1) Change in the scope or the objective of the project or program...

  6. IS IT REAL - THE RELATIONSHIP BETWEEN VEAL DEFICITS AND REAL GROWTH - NEW EVIDENCE USING LONG-RUN DATA

    NARCIS (Netherlands)

    DEHAAN, J; STURM, JE

    Long-run data for the USA is used to examine whether the inflation adjustment of the government budget deficit as proposed by Eisner and Pieper makes a difference in assessing the impact of fiscal policy on economic growth. Using Vector Autoregressions (VAR) it is found that both the inflation

  7. Capital budgeting practices in Indian companies

    Directory of Open Access Journals (Sweden)

    Roopali Batra

    2017-03-01

    Full Text Available The volatility of the global economy, changing business practices, and academic developments have created a need to re-examine Indian corporate capital budgeting practices. Our research is based on a sample of 77 Indian companies listed on the Bombay Stock Exchange. Results reveal that corporate practitioners largely follow the capital budgeting practices proposed by academic theory. Discounted cash flow techniques of net present value and internal rate of return and risk adjusted sensitivity analysis are most popular. Weighted average cost of capital as cost of capital is most favoured. Nevertheless, the theory-practice gap remains in adoption of specialised techniques of real options, modified internal rate of return (MIRR, and simulation. Non-financial criteria are also given due consideration in project selection.

  8. Aspects of capital budgeting decision-making process of emerging markets transnational corporations

    OpenAIRE

    Alieva, D.

    2012-01-01

    Considers present-day aspects of capital budgeting decision-making in investment projects by transnational corporations (TNCs) in emerging markets. Discusses peculiarities of cash flows of TNC mother and project companies which influence the decision-making in project investment. A number of effective valuation techniques for multicurrency projects has been proposed, taking into account adjustments for various factors.

  9. Title X may get 10% funding increase despite cutbacks for deficit.

    Science.gov (United States)

    Kaeser, L

    1994-04-01

    The politics of the US budget deficit and President's Clinton proposed health budget are described. The proposed health budget included the following items and expenditure levels: Title X planning with a 10% increase to 199 million; abstinence-based programs deleted and funding directed to the Office of Adolescent Health for $6.8 million; Community Health Centers with a 1% increase to $604 million; WIC with a 12% increase to $3.7 billion; Title IIIb of the Ryan White CARE Act on AIDS prevention with a 40% increase to $67 million; National Institute of Child Heath and Human Development, including contraceptive research, with a 5% increase to $581 million; Sexually Transmitted Disease Prevention for $100 million; Breast and Cervical Cancer Screening for $78 million; and Maternal and Child Health Block Grant with a 1% increase to $679 million. Abortion funding for poor women was an item deleted from the appropriations budget for the next fiscal year, because of its inclusion in health care reform. Final funding levels may diverge greatly from Clinton's proposed budget outlined above. Appropriations subcommittees will consider funding for each of the departments. There is no certainty on how the administration will support the proposed budget, or what actions on health care reform will impact on appropriations. If the cost of health care reform is enough, it may be that other health funding will be cut. The president's budget was sent to Congress on February 7, 1994, and included mandatory entitlement programs, which are 66% of the entire federal budget, and discretionary spending, such as for family planning. The prior Bush and Reagan administrations reduced discretionary funding, and Clinton is in the awkward position of having politically supported both increased health funding and federal budget reduction. The agreement between Congress and President Clinton in 1993 to cut federal spending over the next 5 years has reduced the ability to include new spending.

  10. Capital Budgeting: a Tax Shields’ “Mirage”?

    Directory of Open Access Journals (Sweden)

    Victor DRAGOTĂ

    2011-03-01

    Full Text Available The mainstream in Finance studies recognizes the impact of tax shields on capital budgeting. This study offers some evidences regarding a bias in direct investment projects valuation in the case of taking into account of the allowance of recovery of the losses recorded in the past financial exercises from future profits as long as the classical indicators (e.g., Net Present Value are used. Also, this tax regime seems to favour the adoption of less-performer projects by lessperformer companies, as long as these projects should be otherwise rejected by a performer company.

  11. Draving Up a Budget Using The Activity Based Budgeting Methodology Through The Simulation Of Processes

    Directory of Open Access Journals (Sweden)

    Dita Janíková

    2011-12-01

    Full Text Available This paper deals with a connection between financial and quality management systems. These departments only rarely cooperate on projects, which could be a loss, because this connection has many improvement opportunities. The author shows through the simple example of catering deliveries a possible procedure of how to reach a more realistic evaluation of production costs for each product and how to connect budgeting and process analysis.

  12. A Fiscal Cliff: The Current U.S. Federal Budget, Potential Cuts, and Impacts on Science Funding

    Science.gov (United States)

    Uhlenbrock, K. M.; Landau, E. A.; Hankin, E. R.

    2012-12-01

    As lawmakers on Capitol Hill face challenges to reach an agreement on how to cut the deficit while growing the economy, scientists must join the discussion and outline the serious impacts cuts to federal science programs will have on our society. Consistent and sustained federal science funding (discretionary spending) is an ever increasing struggle with the rising costs of mandatory spending and decrease in revenues. In 2011 Congress passed the Budget Control Act, which will require automatic across-the-board cuts, known as sequestration, and will take effect on 2 January 2013. Estimated cuts of $1.2 trillion and discretionary spending caps set at Fiscal Year 2012 levels will trigger non-defense program cuts of 9.8% in the first year as reported by the Congressional Research Service. Funding from non-defense program agencies such as NSF, NASA, DOE, NOAA, USGS, and others drive science and technological innovation, support public safety, create jobs, educate generations of scientists, stimulate the economy, protect our environment, and enrich lives. With non-defense discretionary programs representing less than one-fifth of the federal budget, severe cuts to these programs will not alleviate our deficit, but instead restrict our growth.

  13. Home - House Budget Committee

    Science.gov (United States)

    Initiatives Hearings Full Menu About Toggle Links Members History Staff Rules & Budget Law News Toggle Links Press Releases Budget Digests HBC Publications Op-Eds Speeches & Statements Budgets Toggle Links FY 2018 Budget FY 2017 Budget FY 2017 Reconciliation FY 2016 Budget FY 2016 Reconciliation FY 2015

  14. Late Budgets

    DEFF Research Database (Denmark)

    Andersen, Asger Lau; Lassen, David Dreyer; Nielsen, Lasse Holbøll Westh

    are negative rather than positive; and when there is divided government. We test the hypotheses of the model using a unique data set of late budgets for US state governments, based on dates of budget approval collected from news reports and a survey of state budget o¢ cers for the period 1988...

  15. Radial measures of public services deficit for regional allocation of public funds

    OpenAIRE

    Puig, Jaume

    2005-01-01

    The goal of this paper is to present an optimal resource allocation model for the regional allocation of public service inputs. The proposed solution leads to maximise the relative public service availability in regions located below the best availability frontier, subject to exogenous budget restrictions and equality of access for equal need criteria (equity-based notion of regional needs). The construction of non-parametric deficit indicators is proposed for public service availability by a...

  16. Global Carbon Budget 2016

    Science.gov (United States)

    Quéré, Corinne Le; Andrew, Robbie M.; Canadell, Josep G.; Sitch, Stephen; Korsbakken, Jan Ivar; Peters, Glen P.; Manning, Andrew C.; Boden, Thomas A.; Tans, Pieter P.; Houghton, Richard A.; hide

    2016-01-01

    Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere the global carbon budget is important to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe data sets and methodology to quantify all major components of the global carbon budget, including their uncertainties, based on the combination of a range of data, algorithms, statistics, and model estimates and their interpretation by a broad scientific community. We discuss changes compared to previous estimates and consistency within and among components, alongside methodology and data limitations. CO2 emissions from fossil fuels and industry (EFF) are based on energy statistics and cement production data, respectively, while emissions from land-use change (ELUC), mainly deforestation, are based on combined evidence from land-cover change data, fire activity associated with deforestation, and models. The global atmospheric CO2 concentration is measured directly and its rate of growth (GATM) is computed from the annual changes in concentration. The mean ocean CO2 sink (SOCEAN) is based on observations from the 1990s, while the annual anomalies and trends are estimated with ocean models. The variability in SOCEAN is evaluated with data products based on surveys of ocean CO2 measurements. The global residual terrestrial CO2 sink (SLAND) is estimated by the difference of the other terms of the global carbon budget and compared to results of independent dynamic global vegetation models. We compare the mean land and ocean fluxes and their variability to estimates from three atmospheric inverse methods for three broad latitude bands. All uncertainties are reported as +/- 1(sigma), reflecting the current capacity to characterize the annual estimates of each component of the global carbon budget. For the last decade available (2006-2015), EFF was 9

  17. California Budget Simulation

    Science.gov (United States)

    Mallinson, Daniel J.

    2018-01-01

    The California Budget Challenge produced by Next10 provides a useful and intuitive tool for instructors to introduce students to public budgeting. Students will reason through a series of budgeting decisions using information provided on the fiscal and practical implications of their choices. The Challenge is updated with each budget cycle, so it…

  18. Global Carbon Budget 2017

    Directory of Open Access Journals (Sweden)

    C. Le Quéré

    2018-03-01

    Full Text Available Accurate assessment of anthropogenic carbon dioxide (CO2 emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere – the global carbon budget – is important to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe data sets and methodology to quantify the five major components of the global carbon budget and their uncertainties. CO2 emissions from fossil fuels and industry (EFF are based on energy statistics and cement production data, respectively, while emissions from land-use change (ELUC, mainly deforestation, are based on land-cover change data and bookkeeping models. The global atmospheric CO2 concentration is measured directly and its rate of growth (GATM is computed from the annual changes in concentration. The ocean CO2 sink (SOCEAN and terrestrial CO2 sink (SLAND are estimated with global process models constrained by observations. The resulting carbon budget imbalance (BIM, the difference between the estimated total emissions and the estimated changes in the atmosphere, ocean, and terrestrial biosphere, is a measure of imperfect data and understanding of the contemporary carbon cycle. All uncertainties are reported as ±1σ. For the last decade available (2007–2016, EFF was 9.4 ± 0.5 GtC yr−1, ELUC 1.3 ± 0.7 GtC yr−1, GATM 4.7 ± 0.1 GtC yr−1, SOCEAN 2.4 ± 0.5 GtC yr−1, and SLAND 3.0 ± 0.8 GtC yr−1, with a budget imbalance BIM of 0.6 GtC yr−1 indicating overestimated emissions and/or underestimated sinks. For year 2016 alone, the growth in EFF was approximately zero and emissions remained at 9.9 ± 0.5 GtC yr−1. Also for 2016, ELUC was 1.3 ± 0.7 GtC yr−1, GATM was 6.1 ± 0.2 GtC yr−1, SOCEAN was 2.6 ± 0.5 GtC yr−1, and SLAND was 2.7 ± 1.0 GtC yr−1, with a small BIM of −0.3 GtC. GATM continued to be

  19. Budgeting for School Media Centers.

    Science.gov (United States)

    Drott, M. Carl

    1978-01-01

    Describes various forms of budgets and discusses concepts in budgeting useful to supervisors of school media centers: line item budgets, capital budgets, creating budgets, the budget calendar, innovations, PPBS (Planning, Programing, Budgeting System), zero-based budgeting, cost-benefit analysis, benefits, benefit guidelines, and budgeting for the…

  20. Workshop on assessments of National Carbon Budgets within the Nordic Region

    DEFF Research Database (Denmark)

    Hansen, Kristina; Koyama, Aki; Lansø, Anne Sofie

    The three-day workshop organized by the three Nordic research projects; ECOCLIM, LAGGE and SnowCarbo brought together scientists and other actors from Nordic countries to communicate and discuss research on carbon budget estimations in the Nordic region. Through presentations of most recent...... research in the field and following scientific discussions, the workshop contributed to strengthen the scientific basis of the identification and quantification of major natural carbon sinks in the Nordic region on which integrated climate change abatement and management strategies and policy decisions...... status and knowledge on research on assessments of national carbon budgets as well as on projections and sensitivity to future changes in e.g. management and climate change in the Nordic Region....

  1. Workshop on assessments of National Carbon Budgets within the Nordic Region

    DEFF Research Database (Denmark)

    Mørk, Eva Thorborg; Lansø, Anne Sofie; Hansen, Kristina

    2013-01-01

    The three-day workshop organized by the three Nordic research projects; ECOCLIM, LAGGE and SnowCarbo brought together scientists and other actors from Nordic countries to communicate and discuss research on carbon budget estimations in the Nordic region. Through presentations of most recent...... research in the field and following scientific discussions, the workshop contributed to strengthen the scientific basis of the identification and quantification of major natural carbon sinks in the Nordic region on which integrated climate change abatement and management strategies and policy decisions...... status and knowledge on research on assessments of national carbon budgets as well as on projections and sensitivity to future changes in e.g. management and climate change in the Nordic Region....

  2. RealWorld evaluation: working under budget, time, data, and political constraints

    National Research Council Canada - National Science Library

    Bamberger, Michael; Rugh, Jim; Mabry, Linda

    2012-01-01

    .... Vignettes and case studies--representing evaluations from a variety of geographic regions and sectors--demonstrate adaptive possibilities for small projects with budgets of a few thousand dollars...

  3. Problems and Specific Features of Sub-Federal Budgets Execution in 2015

    Directory of Open Access Journals (Sweden)

    Anna Ivanovna Povarova

    2016-09-01

    Full Text Available Last year has been marked by worrying trends in the development of a budgetary crisis in Russian regions; the crisis became apparent in 2013, when regional authorities had to get into huge debts in order to provide finances for the social obligations in the framework of the presidential decrees of May 7, 2012. The budget process in 2015 was characterized by expanding negative trends in those regions that had previously been the engines of economic growth and budget donors, which contradicts the regional development strategy. The crisis response measures consist in a large-scale optimization of expenses. Despite an attempt undertaken by the Government to replace commercial borrowings with budget loans, there are still no prospects for solving the debt issue. On the contrary, expert forecasts predict a doubling of the debt stock in regions by the end of 2017. Cuts in the expenditures on human capital development should be considered as a new negative trend, naturally resulting in the deterioration of material well-being of Russians, which was expressed in the decline in their real incomes and raising poverty level. It seems that on the eve of the RF State Duma elections the social policy of the authorities ceases to be socially oriented. Under the circumstances of an aggravating budget crisis, the Government is not increasing unrepayable financial aid (it did increase it in 2009; instead, it is pursuing the opposite policy and estranges itself from providing support to regions. Moreover, the Cabinet of Ministers does not openly wish to carry out a just division of powers and obligations of governmental units, but turns it into a mechanism for financing federal budget deficit by shifting state obligations onto the regions. The paper presents the results of the analysis of sub-federal budgets execution in 2015. The main goal was to identify the features of budget process and trends in the dynamics of budget parameters. The main conclusion is that

  4. Bütçe Açıkları ile Parasal Büyüme ve Enflasyon Arasındaki İlişki: Türkiye İçin Bir Model Denemesi(The Relationship Among Budget Deficits, Monetary Growth and Inflations: A Model Application for Turkey

    Directory of Open Access Journals (Sweden)

    C. Yenal KESBİÇ

    2004-01-01

    Full Text Available The aim of this paper is to find an econometric relation between inflation and internal borrowing as an instrument for budget financing, and to assess the impact of a given internal borrowing on inflation. It is mainly argued that budget deficits financed through internal borrowing causes monetary expansion, which results in higher inflation. We want to show that the persistent inflation in Turkey has fiscal roots and any attempt of stopping inflation should imply fiscal adjustments. In this context, firstly, the relation between inflation and the instruments for budget financing (short term advances and internal borrowing has theoretically been examined, and then, the situation in Turkey has been exhibited for the period 1989 to 2003. Finally, the relation between internal borrowing and inflation has econometrically been analyzed using the Simultaneous Equations System. In order to purify the effect of internal borrowing, two subsamples were processed, one of which includes short term advances from the central bank to the Treasury, and the other one of which does not. It is found that there is a negative relationship between outstanding internal debt and money supply and thereby inflation, except in the first subsample.

  5. DCS Budget Tracking System

    Data.gov (United States)

    Social Security Administration — DCS Budget Tracking System database contains budget information for the Information Technology budget and the 'Other Objects' budget. This data allows for monitoring...

  6. Cash budgeting: an underutilized resource management tool in not-for-profit health care entities.

    Science.gov (United States)

    Hauser, R C; Edwards, D E; Edwards, J T

    1991-01-01

    Cash budgeting is generally considered to be an important part of resource management in all businesses. However, respondents to a survey of not-for-profit health care entities revealed that some 40 percent of the participants do not currently prepare cash budgets. Where budgeting occurred, the cash forecasts covered various time frames, and distribution of the document was inconsistent. Most budgets presented cash receipts and disbursements according to operating, investing, and financing activities--a format consistent with the year-end cash flow statement. By routinely preparing monthly cash budgets, the not-for-profit health care entity can project cash inflow/outflow or position with anticipated cash insufficiencies and surpluses. The budget should be compared each month to actual results to evaluate performance. The magnitude and timing of cash flows is much too critical to be left to chance.

  7. The effect of motivation profile and participative budgeting on budget goal commitment

    DEFF Research Database (Denmark)

    Sandalgaard, Niels; Bukh, Per Nikolaj; Poulsen, Carsten Stig

    2009-01-01

    The effect of participative budgeting on motivation is often considered in management accounting research. In this study we focus on dispositional factors of motivation rooted in personality that affect budgeting. Especially we focus on the effect of personality traits in the form of achievement......, power and affiliation motives on budget goal commitment in interaction with participative budgeting. The study is based on a survey among bank managers at different organizational levels of a Scandinavian regional bank and the results indicate that the effect of participative budgeting on budget goal...... commitment is moderated by the implicit power motivation of the bank manager....

  8. The Fast Forward MBA in Project Management

    CERN Document Server

    Verzuh, Eric

    2011-01-01

    An updated and revised edition of the bestselling guide to managing projects For any professional responsible for coordinating projects among different departments, across executive levels, or with technical complexity, The Fast Forward MBA in Project Management offers comprehensive instruction on how to deliver on time and on budget. Get the step-by-step advice you need to find the right sponsor, clarify objectives, and set realistic schedules and budget projections. This Fourth Edition of the 200,000-copy bestseller now covers critical new topics including: software and IT projects, agile te

  9. Passive behavior of the government. Budget problems are aggravating in the regions

    Directory of Open Access Journals (Sweden)

    Anna Ivanovna Povarova

    2015-07-01

    Full Text Available Despite a number of reforms, the current multi-level budgetary system does not fully correspond to the development strategy of the country and its regions. Still the Russian Government has not taken effective measures to address the main structural contradiction of the budgetary system, based on the non-adequate distribution of revenue and expenditure responsibilities, manifested in the sharp decline in the revenue base of territorial budgets during the 2009 global financial crisis. However, the crisis effects have not been analyzed and the conclusions have not been made. The Ministry of Finance of the Russian Federation tried to solve the problem of territorial budgets imbalance not by enhancing existing mechanisms of revenue distribution at the regional level, but by granting large-scale loans to be repaid after 2012. Despite it, due to the sharp rise in the social burden, the deficit and the debt load enlarged and resulted in the budget crisis in the regions. The experts of the Higher School of Economics state that 20 RF subjects, having the level of public debt above 80%, had been actually in default by the end of 2014. Instead of finding ways out of the fiscal crisis, the Russian authorities gradually lose overall control over the processes of regional development. The mechanisms of federal target programs work poorly and the RF subjects have to finance program activities. In fact, the management of territorial development is reduced to the transfer of financial resources from the federal budget to the regions and the Ministry of Finance of the Russian Federation regulating interbudgetary relations has, in fact, become the only real institute of regional policy. But the interbudgetary policy of the Ministry of Finance does not gain visible economic returns: in 2006–2014 the amount of repayable financial assistance to the regional budgets increased from 0.6 to 1.5 trillion rubles, and the number of selfsufficient territories decreased from

  10. Global and regional phosphorus budgets in agricultural systems and their implications for phosphorus-use efficiency

    Science.gov (United States)

    Lun, Fei; Liu, Junguo; Ciais, Philippe; Nesme, Thomas; Chang, Jinfeng; Wang, Rong; Goll, Daniel; Sardans, Jordi; Peñuelas, Josep; Obersteiner, Michael

    2018-01-01

    The application of phosphorus (P) fertilizer to agricultural soils increased by 3.2 % annually from 2002 to 2010. We quantified in detail the P inputs and outputs of cropland and pasture and the P fluxes through human and livestock consumers of agricultural products on global, regional, and national scales from 2002 to 2010. Globally, half of the total P inputs into agricultural systems accumulated in agricultural soils during this period, with the rest lost to bodies of water through complex flows. Global P accumulation in agricultural soil increased from 2002 to 2010 despite decreases in 2008 and 2009, and the P accumulation occurred primarily in cropland. Despite the global increase in soil P, 32 % of the world's cropland and 43 % of the pasture had soil P deficits. Increasing soil P deficits were found for African cropland vs. increasing P accumulation in eastern Asia. European and North American pasture had a soil P deficit because the continuous removal of biomass P by grazing exceeded P inputs. International trade played a significant role in P redistribution among countries through the flows of P in fertilizer and food among countries. Based on country-scale budgets and trends we propose policy options to potentially mitigate regional P imbalances in agricultural soils, particularly by optimizing the use of phosphate fertilizer and the recycling of waste P. The trend of the increasing consumption of livestock products will require more P inputs to the agricultural system, implying a low P-use efficiency and aggravating P-stock scarcity in the future. The global and regional phosphorus budgets and their PUEs in agricultural systems are publicly available at https://doi.pangaea.de/10.1594/PANGAEA.875296.

  11. Government's nuclear draft budget for fiscal 1995 totals 480 billion yen, up 5.2%

    International Nuclear Information System (INIS)

    1995-01-01

    The Japanese government's nuclear draft budget for fiscal 1995 totals 480,756 million yen (excluding the nuclear-related budget for universities under the auspices of the Ministry of Education, Culture and Science), 5.2% increase from the last year. The figure can be broken down into 194,793 million yen general account mainly assigned to research and development projects, and 295,963 million yen special account for power resource development. The total nuclear-related draft budget can be broken down into 344,201 million yen (6.2% increase) for the Science and Technology Agency which governs the various projects on the research and utilization of nuclear energy, and 133,430 million yen (4.6% increase) for the Ministry of International Trade and Industry which controls the development of and the regulation concerning commercial nuclear power plants. As for other ministries, 3,909 million yen for the contribution to IAEA and 283 million yen for OECD/NEA are allocated to the Ministry of Foreign Affairs. The nuclear draft budget of other ministries and agencies than STA and MITI totals 5,443 million yen (3.8% increase over fiscal 1994). The details of the nuclear-related draft budget of STA and MITI are listed. (K.I.)

  12. Systems budgets architecture and development for the Maunakea Spectroscopic Explorer

    Science.gov (United States)

    Mignot, Shan; Flagey, Nicolas; Szeto, Kei; Murowinski, Rick; McConnachie, Alan

    2016-08-01

    The Maunakea Spectroscopic Explorer (MSE) project is an enterprise to upgrade the existing Canada-France- Hawaii observatory into a spectroscopic facility based on a 10 meter-class telescope. As such, the project relies on engineering requirements not limited only to its instruments (the low, medium and high resolution spectrographs) but for the whole observatory. The science requirements, the operations concept, the project management and the applicable regulations are the basis from which these requirements are initially derived, yet they do not form hierarchies as each may serve several purposes, that is, pertain to several budgets. Completeness and consistency are hence the main systems engineering challenges for such a large project as MSE. Special attention is devoted to ensuring the traceability of requirements via parametric models, derivation documents, simulations, and finally maintaining KAOS diagrams and a database under IBM Rational DOORS linking them together. This paper will present the architecture of the main budgets under development and the associated processes, expand to highlight those that are interrelated and how the system, as a whole, is then optimized by modelling and analysis of the pertinent system parameters.

  13. Global Carbon Budget 2015

    Science.gov (United States)

    Le Quéré, C.; Moriarty, R.; Andrew, R. M.; Canadell, J. G.; Sitch, S.; Korsbakken, J. I.; Friedlingstein, P.; Peters, G. P.; Andres, R. J.; Boden, T. A.; Houghton, R. A.; House, J. I.; Keeling, R. F.; Tans, P.; Arneth, A.; Bakker, D. C. E.; Barbero, L.; Bopp, L.; Chang, J.; Chevallier, F.; Chini, L. P.; Ciais, P.; Fader, M.; Feely, R. A.; Gkritzalis, T.; Harris, I.; Hauck, J.; Ilyina, T.; Jain, A. K.; Kato, E.; Kitidis, V.; Klein Goldewijk, K.; Koven, C.; Landschützer, P.; Lauvset, S. K.; Lefèvre, N.; Lenton, A.; Lima, I. D.; Metzl, N.; Millero, F.; Munro, D. R.; Murata, A.; Nabel, J. E. M. S.; Nakaoka, S.; Nojiri, Y.; O'Brien, K.; Olsen, A.; Ono, T.; Pérez, F. F.; Pfeil, B.; Pierrot, D.; Poulter, B.; Rehder, G.; Rödenbeck, C.; Saito, S.; Schuster, U.; Schwinger, J.; Séférian, R.; Steinhoff, T.; Stocker, B. D.; Sutton, A. J.; Takahashi, T.; Tilbrook, B.; van der Laan-Luijkx, I. T.; van der Werf, G. R.; van Heuven, S.; Vandemark, D.; Viovy, N.; Wiltshire, A.; Zaehle, S.; Zeng, N.

    2015-12-01

    Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere is important to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe data sets and a methodology to quantify all major components of the global carbon budget, including their uncertainties, based on the combination of a range of data, algorithms, statistics, and model estimates and their interpretation by a broad scientific community. We discuss changes compared to previous estimates as well as consistency within and among components, alongside methodology and data limitations. CO2 emissions from fossil fuels and industry (EFF) are based on energy statistics and cement production data, while emissions from land-use change (ELUC), mainly deforestation, are based on combined evidence from land-cover-change data, fire activity associated with deforestation, and models. The global atmospheric CO2 concentration is measured directly and its rate of growth (GATM) is computed from the annual changes in concentration. The mean ocean CO2 sink (SOCEAN) is based on observations from the 1990s, while the annual anomalies and trends are estimated with ocean models. The variability in SOCEAN is evaluated with data products based on surveys of ocean CO2 measurements. The global residual terrestrial CO2 sink (SLAND) is estimated by the difference of the other terms of the global carbon budget and compared to results of independent dynamic global vegetation models forced by observed climate, CO2, and land-cover change (some including nitrogen-carbon interactions). We compare the mean land and ocean fluxes and their variability to estimates from three atmospheric inverse methods for three broad latitude bands. All uncertainties are reported as ±1σ, reflecting the current capacity to characterise the annual estimates of each component of the global

  14. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  15. Capital Projects Application (CPA)

    Data.gov (United States)

    General Services Administration — Capital Projects application (CPA) provides users with the ability to maintain project related financial data for Budget Activity (BA) 51, 55, 64, 01, 02, 03, 04....

  16. BEYOND BUDGETING

    Directory of Open Access Journals (Sweden)

    Edo Cvrkalj

    2015-12-01

    Full Text Available Traditional budgeting principles, with strictly defined business goals, have been, since 1998, slowly growing into more sophisticated and organization-adjusted alternative budgeting concepts. One of those alternative concepts is the “Beyond budgeting” model with an implemented performance effects measuring process. In order for the model to be practicable, budget planning and control has to be reoriented to the “bottom up” planning and control approach. In today’s modern business surroundings one has to take both present and future opportunities and threats into consideration, by valorizing them in a budget which would allow a company to realize a whole pallet of advantages over the traditional budgeting principles which are presented later in the article. It is essential to emphasize the importance of successfully implementing the new budgeting principles within an organization. If the implementation has been lacking and done without a higher goal in mind, it is easily possible that the process has been implemented without coordination, planning and control framework within the organization itself. Further in the article we present an overview of managerial techniques and instruments within the “Beyond budgeting” model such as balanced scorecard, rolling forecast, dashboard, KPI and other supporting instruments. Lastly we define seven steps for implementing the “Beyond budgeting” model and offer a comparison of “Beyond budgeting” model against traditional budgeting principles which lists twelve reasons why “Beyond budgeting” is better suited to modern and market-oriented organizations. Each company faces those challenges in their own characteristic way but implementing new dynamic planning models will soon become essential for surviving in the market.

  17. Assessing project worth at budget time

    International Nuclear Information System (INIS)

    Land, R.

    1992-01-01

    All manager in business and industry routinely have to decide how to allocate discretionary resources, whether money or people, to optimize the performance of their organizations. These decisions invariably require choices among projects that produce fundamentally different kinds of effects on the organization. Some things are done to eliminate existing problems. Others are done to eliminate potential problems which may never develop. Still others are done to bring about predicted improvements, which also may or may not ever be achieved. This paper discusses the important characteristics required of good project evaluation systems and describes a practical implementation of such a system at several nuclear electric utilities

  18. Public Budgeting: The Compromises Among the Sound Budgeting Principles in Contingency Funding

    Science.gov (United States)

    2017-06-01

    funding for major aircraft using supplemental appropriations in place of incremental funding as intended for normal budgeting practices. This was a prime... incrementally funded on an annual basis. This change in budgeting practices lacked predictability because it allowed last-minute budget requests with low...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release. Distribution is unlimited. PUBLIC BUDGETING

  19. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    Energy Technology Data Exchange (ETDEWEB)

    Enbar, Nadav [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Weng, Dean [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.

  20. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  1. Understanding the Budget Process

    Directory of Open Access Journals (Sweden)

    Mesut Yalvaç

    2000-03-01

    Full Text Available Many different budgeting techniques can be used in libraries, and some combination of these will be appropriate for almost any individual situation. Li-ne-item, program, performance, formula, variable, and zero-base budgets all have features that may prove beneficial in the preparation of a budget. Budgets also serve a variety of functions, providing for short-term and long-term financial planning as well as for cash management over a period of time. Short-term plans are reflected in the operating budget, while long-term plans are reflected in the capital budget. Since the time when cash is available to an organization does not usually coincide with the time that disbursements must be made, it is also important to carefully plan for the inflow and outflow of funds by means of a cash budget.      During the budget process an organization selects its programs and activities by providing the necessary funding; the library, along with others in the organization, must justify its requests. Because of the cyclical nature of the budget process, it is possible continually to gather information and evaluate alternatives for the next budget period so that the library may achieve its maximum potential for service to its patrons.

  2. TRANSPARENCY OF LOCAL BUDGETS IN THE NORTH-WEST REGION OF ROMANIA

    Directory of Open Access Journals (Sweden)

    Pintea Mirela-Oana

    2013-07-01

    Full Text Available The central researched element in our paper is the local budgets, the basic component of local public finances. Local budgets, like any other budgets, are the most important tool for the management (of local governments planning, forecasting, implementing and monitoring the results of administrative-territorial units activity, also being an appropriate tool for enhancing performance. A budget is the government's plan regarding the use of public resources to meet the citizens' needs. The aim of this paper is to realize a research on budget transparency in local governments from the Nord-West Region of Romania, regarding the availability of the budget information on the websites of the county councils and the county residences. The key element of good governance in today global economic environment is transparency that can be defined as the openness of public authorities (central and local regarding their policy intention, formulation and implementation. For local governments budget transparency is an important issue, due to the growing role of administrative-territorial units, confirmed over time by the economic reality. The importance of local budgets has increased in recent years due to the need to improve management efficiency and accounting al the level of local governments. Not only policy makers but also the citizens need information regarding local government current activities, expenditures, development projects and policies. In this context of a growing need for information, the transparency of local budgets is a mandatory condition for any local government. The combination of budget transparency and public participation in budget processes has the potential to combat corruption, foster public accountability of government agencies and contribute to judicious use of public funds. In this context, budget transparency represents the mean through which ordinary citizens and civil society organizations can access information about the

  3. THE IMPLICATIONS OF GROSS FIXED CAPITAL AND UNEMPLOYMENT RATE ON GENERAL GOVERNMENT DEFICIT. EMPIRICAL STUDY AT THE EUROPEAN LEVEL

    Directory of Open Access Journals (Sweden)

    Mihai Carp

    2010-12-01

    Full Text Available In this paper we have evaluated the influence of the modification of public investment level and unemployment rate on the general government deficit at the European Union level. We have created a regression model that shows that a sustained and increased investment policy and the reduction of unemployment rate have a favorable effect on the objective of minimizing the budget deficit. In the last years European Union’s countries had to face a difficult problem concerning fiscal policy. They had to make public investments to stimulate economic growth and, in the same time, they had to meet the convergence criteria’s of public deficit. On the other hand, EU has to deal with a higher rate of unemployment. Through our model we try to see how European Union countries should implement their political strategies on unemployment and investment with the main objective of reducing the general government deficit.

  4. Library Budget Primer.

    Science.gov (United States)

    Warner, Alice Sizer

    1993-01-01

    Discusses the advantages and disadvantages of six types of budgets commonly used by many different kinds of libraries. The budget types covered are lump-sum; formula; line or line-item; program; performance or function; and zero-based. Accompanying figures demonstrate the differences between four of the budget types. (three references) (KRN)

  5. Influence of the economy crisis on project cost management

    Science.gov (United States)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  6. Evaluation of the Factors of Russian Regions’ Convergence / Divergence in the Level of Budget Provision Based on the Decomposition of the Theil - Bernoulli Index

    Directory of Open Access Journals (Sweden)

    Marina Yuryevna Malkina

    2016-09-01

    Full Text Available The study focuses on the Russian regions’ disparities in the level of budget expenditures per capita and their dynamics. The paper assesses contribution of main factors and their correlation, as well as the stages of budget process, to the regional imbalances in the public sector. The author also presents regions’ budget expenditures per capita in a form of five-factor multiplicative model which at the same time demonstrates the sequence of the stages of budget process. To estimate regions’ inequality in budget expenditures and other related variables the researcher employs the Theil - Bernoulli index which is sensitive to excessive poverty. Its decomposition, made on the basis of the Duro and Esteban technique, allows evaluating the structure of inter- regional disparities in the public sector. The results include following: 1 static assessments of the factors contribution to the regions’ convergence in budget expenditure per capita at the stages of GRP production, receipt and distribution of taxes among levels of budget system, the stages of attraction of inter-budgetary support and budget deficit financing; 2 dynamic assessments of the factors contribution to regions’ convergence / divergence in the level of budgetary expenditure per capita for 9 years. The findings may be useful in optimizing the policy of inter-budgetary equalization in Russia

  7. Budget Analysis: Review of the Governor's Proposed Budget, 1999-00.

    Science.gov (United States)

    New York State Office of the Comptroller, Albany.

    This report provides an overview of the 1999-2000 executive budget for New York State. The budget calls for $72.7 billion in all funds spending and proposes that a $1.8 billion surplus from the 1998-99 fiscal year be used to fill budget gaps in fiscal years 2000-01 and 2001-02. The report focuses on spending for education, health and social…

  8. Plan Your Advertising Budget.

    Science.gov (United States)

    Britt, Steuart-Henderson

    1979-01-01

    Methods for establishing an advertising budget are reviewed. They include methods based on percentage of sales or profits, unit of sales, and objective and task. Also discussed are ways to allocate a promotional budget. The most common breakdowns are: departmental budgets, total budget, calendar periods, media, and sales area. (JMD)

  9. Global Carbon Budget 2016

    Science.gov (United States)

    Le Quéré, Corinne; Andrew, Robbie M.; Canadell, Josep G.; Sitch, Stephen; Korsbakken, Jan Ivar; Peters, Glen P.; Manning, Andrew C.; Boden, Thomas A.; Tans, Pieter P.; Houghton, Richard A.; Keeling, Ralph F.; Alin, Simone; Andrews, Oliver D.; Anthoni, Peter; Barbero, Leticia; Bopp, Laurent; Chevallier, Frédéric; Chini, Louise P.; Ciais, Philippe; Currie, Kim; Delire, Christine; Doney, Scott C.; Friedlingstein, Pierre; Gkritzalis, Thanos; Harris, Ian; Hauck, Judith; Haverd, Vanessa; Hoppema, Mario; Klein Goldewijk, Kees; Jain, Atul K.; Kato, Etsushi; Körtzinger, Arne; Landschützer, Peter; Lefèvre, Nathalie; Lenton, Andrew; Lienert, Sebastian; Lombardozzi, Danica; Melton, Joe R.; Metzl, Nicolas; Millero, Frank; Monteiro, Pedro M. S.; Munro, David R.; Nabel, Julia E. M. S.; Nakaoka, Shin-ichiro; O'Brien, Kevin; Olsen, Are; Omar, Abdirahman M.; Ono, Tsuneo; Pierrot, Denis; Poulter, Benjamin; Rödenbeck, Christian; Salisbury, Joe; Schuster, Ute; Schwinger, Jörg; Séférian, Roland; Skjelvan, Ingunn; Stocker, Benjamin D.; Sutton, Adrienne J.; Takahashi, Taro; Tian, Hanqin; Tilbrook, Bronte; van der Laan-Luijkx, Ingrid T.; van der Werf, Guido R.; Viovy, Nicolas; Walker, Anthony P.; Wiltshire, Andrew J.; Zaehle, Sönke

    2016-11-01

    Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere - the "global carbon budget" - is important to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe data sets and methodology to quantify all major components of the global carbon budget, including their uncertainties, based on the combination of a range of data, algorithms, statistics, and model estimates and their interpretation by a broad scientific community. We discuss changes compared to previous estimates and consistency within and among components, alongside methodology and data limitations. CO2 emissions from fossil fuels and industry (EFF) are based on energy statistics and cement production data, respectively, while emissions from land-use change (ELUC), mainly deforestation, are based on combined evidence from land-cover change data, fire activity associated with deforestation, and models. The global atmospheric CO2 concentration is measured directly and its rate of growth (GATM) is computed from the annual changes in concentration. The mean ocean CO2 sink (SOCEAN) is based on observations from the 1990s, while the annual anomalies and trends are estimated with ocean models. The variability in SOCEAN is evaluated with data products based on surveys of ocean CO2 measurements. The global residual terrestrial CO2 sink (SLAND) is estimated by the difference of the other terms of the global carbon budget and compared to results of independent dynamic global vegetation models. We compare the mean land and ocean fluxes and their variability to estimates from three atmospheric inverse methods for three broad latitude bands. All uncertainties are reported as ±1σ, reflecting the current capacity to characterise the annual estimates of each component of the global carbon budget. For the last decade available (2006-2015), EFF was 9

  10. Budget projections 1990, 1991, and 1992 for research in high energy nuclear physics

    International Nuclear Information System (INIS)

    1990-05-01

    Research programs in experimental high energy physics are carried out at Harvard under the general supervision of a departmental faculty committee on high energy physics. The committee members are: G.W. Brandenburg, M. Franklin, S. Geer, R. J. Glauber, K. Kinoshita, F. M. Pipkin, R. F. Schwitters, K. Strauch, M. E. Law, and R. Wilson. Of these individuals, Professors R.J. Glauber, F.M. Pipkin, R.F.Schwitters, K. Strauch, and R. Wilson are the principal investigators with whom a number of junior faculty members and post-doctoral research fellows are associated. Dr. Brandenburg is the Director of the High Energy Physics Laboratory and administers the DOE high energy physics contract. Professor Schwitters is currently on leave of absence as Director of the Superconducting Super Collider project. In the fall of 1990 Professor G. Feldman, who is currently at SLAC, will join the Harvard faculty and become a principal investigator. Harvard is planning to make one or two additional senior faculty appointments in experimental high energy physics over the next two years. The principal goals of the work described here are to carry out forefront programs in high energy physics research and to provide first rate educational opportunities for students. The experimental program supported through HEPL is carried out at the major accelerator centers in the world and addresses some of the most important questions in high energy physics. Harvard's educational efforts are concentrated in graduate education. These budget projections cover all of the Harvard based high energy physics experimental activities. The open-quotes umbrellaclose quotes nature of this contract greatly simplifies support of essential central technical and computer services and helps the group to take advantage of new physics opportunities and to respond to unexpected needs. The funding for the operation of the HEPL facility is shared equally by the experimental groups

  11. Budgeting and Beyond

    DEFF Research Database (Denmark)

    Rohde, Carsten

    Budgets and budget control has been known since the early 19th century1. However the use of budget control was until the beginning of the 1920ies in US primarily related to governmental units and states and to a minor extent to business units in practice. At that time James McKinsey describes...

  12. Cumulative carbon emissions budgets consistent with 1.5 °C global warming

    Science.gov (United States)

    Tokarska, Katarzyna B.; Gillett, Nathan P.

    2018-04-01

    The Paris Agreement1 commits ratifying parties to pursue efforts to limit the global temperature increase to 1.5 °C relative to pre-industrial levels. Carbon budgets2-5 consistent with remaining below 1.5 °C warming, reported in the IPCC Fifth Assessment Report (AR5)2,6,8, are directly based on Earth system model (Coupled Model Intercomparison Project Phase 5)7 responses, which, on average, warm more than observations in response to historical CO2 emissions and other forcings8,9. These models indicate a median remaining budget of 55 PgC (ref. 10, base period: year 1870) left to emit from January 2016, the equivalent to approximately five years of emissions at the 2015 rate11,12. Here we calculate warming and carbon budgets relative to the decade 2006-2015, which eliminates model-observation differences in the climate-carbon response over the historical period9, and increases the median remaining carbon budget to 208 PgC (33-66% range of 130-255 PgC) from January 2016 (with mean warming of 0.89 °C for 2006-2015 relative to 1861-188013-18). There is little sensitivity to the observational data set used to infer warming that has occurred, and no significant dependence on the choice of emissions scenario. Thus, although limiting median projected global warming to below 1.5 °C is undoubtedly challenging19-21, our results indicate it is not impossible, as might be inferred from the IPCC AR5 carbon budgets2,8.

  13. The geostationary Earth radiation budget (GERB) instrument on EUMETSAT's MSG satellite

    Science.gov (United States)

    Sandford, M. C. W.; Allan, P. M.; Caldwell, M. E.; Delderfield, J.; Oliver, M. B.; Sawyer, E.; Harries, J. E.; Ashmall, J.; Brindley, H.; Kellock, S.; Mossavati, R.; Wrigley, R.; Llewellyn-Jones, D.; Blake, O.; Butcher, G.; Cole, R.; Nelms, N.; DeWitte, S.; Gloesener, P.; Fabbrizzi, F.

    2003-12-01

    Geostationary Earth radiation budget (GERB) is an Announcement of Opportunity Instrument for EUMETSAT's Meteosat Second Generation (MSG) satellite. GERB will make accurate measurements of the Earth Radiation Budget from geostationary orbit, provide an absolute reference calibration for LEO Earth radiation budget instruments and allow studies of the energetics of atmospheric processes. By operating from geostationary orbit, measurements may be made many times a day, thereby providing essentially perfect diurnal sampling of the radiation balance between reflected and emitted radiance for that area of the globe within the field of view. GERB will thus complement other instruments which operate in low orbit and give complete global coverage, but with poor and biased time resolution. GERB measures infrared radiation in two wavelength bands: 0.32-4.0 and 0.32- 30 μm, with a pixel element size of 44 km at sub-satellite point. This paper gives an overview of the project and concentrates on the design and development of the instrument and ground testing and calibration, and lessons learnt from a short time scale low-budget project. The instrument was delivered for integration on the MSG platform in April 1999 ready for the proposed launch in October 2000, which has now been delayed probably to early 2002. The ground segment is being undertaken by RAL and RMIB and produces near real-time data for meteorological applications in conjunction with the main MSG imager—SEVERI. Climate research and other applications which are being developed under a EU Framework IV pilot project will be served by fully processed data. Because of the relevance of the observations to climate change, it is planned to maintain an operating instrument in orbit for at least 3.5 years. Two further GERB instruments are being built for subsequent launches of MSG.

  14. Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters

    Science.gov (United States)

    Huang, Xiaoxia

    2007-01-01

    In an uncertain economic environment, experts' knowledge about outlays and cash inflows of available projects consists of much vagueness instead of randomness. Investment outlays and annual net cash flows of a project are usually predicted by using experts' knowledge. Fuzzy variables can overcome the difficulties in predicting these parameters. In this paper, capital budgeting problem with fuzzy investment outlays and fuzzy annual net cash flows is studied based on credibility measure. Net present value (NPV) method is employed, and two fuzzy chance-constrained programming models for capital budgeting problem are provided. A fuzzy simulation-based genetic algorithm is provided for solving the proposed model problems. Two numerical examples are also presented to illustrate the modelling idea and the effectiveness of the proposed algorithm.

  15. Storytelling to support watershed research on emerging issues

    Science.gov (United States)

    Phillip Hellman

    2016-01-01

    Projections of budget deficits by the Congressional Budget Office imply ever-increasing pressure on federal spending for all purposes, including long-term watershed research. This presentation will argue that, since federal funding is ultimately a political decision, those responsible for maintaining long-term watershed research programs should not try to provide ...

  16. Budgeting Approaches in Community Colleges

    Science.gov (United States)

    Palmer, James C.

    2014-01-01

    Several budgeting approaches have been initiated as alternatives to the traditional, incremental process. These include formula budgeting; zero-base budgeting; planning, programming, and budgeting systems; and responsibility center budgeting. Each is premised on assumptions about how organizations might best make resource allocation decisions.…

  17. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    Energy Technology Data Exchange (ETDEWEB)

    Enbar, Nadav [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Weng, Dean [Electric Power Research Inst. (EPRI), Palo Alto, CA (United States); Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-12-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.

  18. The Central Bank and the State Budget: Selected Legal Aspects

    Directory of Open Access Journals (Sweden)

    Andrzej Borodo

    2015-09-01

    Full Text Available The Polish Central Bank (National Bank of Poland – NBP performs mainly macro-economic tasks, for maintaining price levels. This Bank is not focused on tasks aimed at the interests of the State Budget. The Central Bank has a lot of power in the creation of money. It seems, there is possible to create the budgetary revenues, which are connected with the emission of money. In particular, the income from emission of coins may be determined as the budget revenue. The connection the Treasury with the Central Bank results from the historical evolution of the origin and role of the Central Bank. It is reasonable to increase the role of the treasury securities in the Central Bank activity. The Treasury Bills should be used in the open market policy leading by the Central Bank. There is the issue of changing of the Constitution of the Republic Poland in the field of limit of the public debt (60% of GDP. It seems, the Polish Constitution should not be the only constitution in the world that introduced such a limit. This limit, and the limit on annual budgetary deficit, introduces EU law. That is a sufficient legal limit.

  19. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  20. Global and regional phosphorus budgets in agricultural systems and their implications for phosphorus-use efficiency

    Directory of Open Access Journals (Sweden)

    F. Lun

    2018-01-01

    Full Text Available The application of phosphorus (P fertilizer to agricultural soils increased by 3.2 % annually from 2002 to 2010. We quantified in detail the P inputs and outputs of cropland and pasture and the P fluxes through human and livestock consumers of agricultural products on global, regional, and national scales from 2002 to 2010. Globally, half of the total P inputs into agricultural systems accumulated in agricultural soils during this period, with the rest lost to bodies of water through complex flows. Global P accumulation in agricultural soil increased from 2002 to 2010 despite decreases in 2008 and 2009, and the P accumulation occurred primarily in cropland. Despite the global increase in soil P, 32 % of the world's cropland and 43 % of the pasture had soil P deficits. Increasing soil P deficits were found for African cropland vs. increasing P accumulation in eastern Asia. European and North American pasture had a soil P deficit because the continuous removal of biomass P by grazing exceeded P inputs. International trade played a significant role in P redistribution among countries through the flows of P in fertilizer and food among countries. Based on country-scale budgets and trends we propose policy options to potentially mitigate regional P imbalances in agricultural soils, particularly by optimizing the use of phosphate fertilizer and the recycling of waste P. The trend of the increasing consumption of livestock products will require more P inputs to the agricultural system, implying a low P-use efficiency and aggravating P-stock scarcity in the future. The global and regional phosphorus budgets and their PUEs in agricultural systems are publicly available at https://doi.pangaea.de/10.1594/PANGAEA.875296.

  1. Zero-based budgeting: Pathway to sustainable budget implementation in Nigeria

    OpenAIRE

    Udeh Francis Nnoli; Sopekan Sam Adeyemi; Oraka Azubuike Onuora

    2017-01-01

    This paper investigates the application of Zero-Based Budgeting (ZBB) system to budget implementation by the Federal Government of Nigeria by ascertaining among others, the relationship between ZBB approach and budget performance indices in Nigeria. To achieve the above, primary data were obtained through questionnaires that were specifically designed for this study. The data obtained were analysed with the SPSS version 21. The statistical tools employed were Analysis of Variance (ANOVA) and ...

  2. Budgeting Time to Teach about the School Budget

    Science.gov (United States)

    Weiss, Dale

    2011-01-01

    As a teacher in the Milwaukee Public Schools (MPS) for the past 16 years, the author has grown used to dismal budget cut news arriving each February. Although cuts are always frustrating and their results burdensome, the school has been able to "hang on" reasonably well. This year, however, the budget cuts were extreme. In this article,…

  3. STATE BUDGET APPROPRIATION MANAGERS AS THE SUBJECTS OF BUDGET PLANNING IN THE REPUBLIC OF LITHUANIA

    Directory of Open Access Journals (Sweden)

    Bronius Sudavicius

    2017-01-01

    Full Text Available The subject. The article deals with the problem of legal status of the state budget appropriation managers in the process of budget planning in the Republic of Lithuania.The purpose of the article is evaluation of state budget appropriation managers’ role in the process of budget planning in the Republic of Lithuania.The methodology of research is the analysis of the budgetary legislation of the Republic of Lithuania and the scientific literature, using the methods of logical and systematic analysis and other methods of scientific researchMain results, and scope of it’s application. The legal definition and the system of state budget appropriation managers is analyzed in the article. Particular attention is given to the question of role of state budget appropriation managers in the process of budget framework. The role of the Government and Parliament, as well as a special body of management of public finances (in the Republic of Lithuania, the Ministry of Finance – legislative and executive authorities – is emphasized in the scientific literature. But it is often not mentioned what an important place in this process other participants of budgetary relations – state budget appropriation managers – takes. The main participation of state budget appropriation managers in the budget planning process related to the planning of the budget expenditures.Preparation of strategic plans and programmes of budgetary funds by state budget appropriation managers can be considered part of governance activities in general. For budget planning drawn up draft budgets of the programs by state budget appropriation managers is particularly important.Conclusions. The efficiency of the use of state funds depends on the spending of funds, the quality and validity of the developed programmes of activities led by their agencies. State budget appropriation managers are involved, along with other entities, on each stage of the budget planning. They provide the

  4. Budget estimates: Fiscal year 1994. Volume 2: Construction of facilities

    Science.gov (United States)

    1994-01-01

    The Construction of Facilities (CoF) appropriation provides contractual services for the repair, rehabilitation, and modification of existing facilities; the construction of new facilities and the acquisition of related collateral equipment; the acquisition or condemnation of real property; environmental compliance and restoration activities; the design of facilities projects; and advanced planning related to future facilities needs. Fiscal year 1994 budget estimates are broken down according to facility location of project and by purpose.

  5. Revisiting global mean sea level budget closure : Preliminary results from an integrative study within ESA's Climate Change Initiative -Sea level Budget Closure-Climate Change Initiative

    Science.gov (United States)

    Palanisamy, H.; Cazenave, A. A.

    2017-12-01

    The global mean sea level budget is revisited over two time periods: the entire altimetry era, 1993-2015 and the Argo/GRACE era, 2003-2015 using the version '0' of sea level components estimated by the SLBC-CCI teams. The SLBC-CCI is an European Space Agency's project on sea level budget closure using CCI products. Over the entire altimetry era, the sea level budget was performed as the sum of steric and mass components that include contributions from total land water storage, glaciers, ice sheets (Greenland and Antarctica) and total water vapor content. Over the Argo/GRACE era, it was performed as the sum of steric and GRACE based ocean mass. Preliminary budget analysis performed over the altimetry era (1993-2015) results in a trend value of 2.83 mm/yr. On comparison with the observed altimetry-based global mean sea level trend over the same period (3.03 ± 0.5 mm/yr), we obtain a residual of 0.2 mm/yr. In spite of a residual of 0.2 mm/yr, the sea level budget result obtained over the altimetry era is very promising as this has been performed using the version '0' of the sea level components. Furthermore, uncertainties are not yet included in this study as uncertainty estimation for each sea level component is currently underway. Over the Argo/GRACE era (2003-2015), the trend estimated from the sum of steric and GRACE ocean mass amounts to 2.63 mm/yr while that observed by satellite altimetry is 3.37 mm/yr, thereby leaving a residual of 0.7 mm/yr. Here an ensemble GRACE ocean mass data (mean of various available GRACE ocean mass data) was used for the estimation. Using individual GRACE data results in a residual range of 0.5 mm/yr -1.1 mm/yr. Investigations are under way to determine the cause of the vast difference between the observed sea level and the sea level obtained from steric and GRACE ocean mass. One main suspect is the impact of GRACE data gaps on sea level budget analysis due to lack of GRACE data over several months since 2011. The current action plan

  6. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  7. Estimating hydrologic budgets for six Persian Gulf watersheds, Iran

    Science.gov (United States)

    Hosseini, Majid; Ghafouri, Mohammad; Tabatabaei, MahmoudReza; Goodarzi, Masoud; Mokarian, Zeinab

    2017-10-01

    Estimation of the major components of the hydrologic budget is important for determining the impacts on the water supply and quality of either planned or proposed land management projects, vegetative changes, groundwater withdrawals, and reservoir management practices and plans. As acquisition of field data is costly and time consuming, models have been created to test various land use practices and their concomitant effects on the hydrologic budget of watersheds. To simulate such management scenarios realistically, a model should be able to simulate the individual components of the hydrologic budget. The main objective of this study is to perform the SWAT2012 model for estimation of hydrological budget in six subbasin of Persian Gulf watershed; Golgol, Baghan, Marghab Shekastian, Tangebirim and Daragah, which are located in south and south west of Iran during 1991-2009. In order to evaluate the performance of the model, hydrological data, soil map, land use map and digital elevation model (DEM) are obtained and prepared for each catchment to run the model. SWAT-CUP with SUFI2 program was used for simulation, uncertainty and validation with 95 Percent Prediction Uncertainty. Coefficient of determination ( R 2) and Nash-Sutcliffe coefficient (NS) were used for evaluation of the model simulation results. Comparison of measured and predicted values demonstrated that each component of the model gave reasonable output and that the interaction among components was realistic. The study has produced a technique with reliable capability for annual and monthly water budget components in Persian Gulf watershed.

  8. Automated Budget System -

    Data.gov (United States)

    Department of Transportation — The Automated Budget System (ABS) automates management and planning of the Mike Monroney Aeronautical Center (MMAC) budget by providing enhanced capability to plan,...

  9. User Oriented Climatic Information for Planning a Snow Removal Budget.

    Science.gov (United States)

    Cohen, Stewart J.

    1981-12-01

    Many activities associated with the transportation sector are weather sensitive. This study is concerned with highway maintenance activities, specifically snow removal, and the budgeting of same by the Illinois Department of Transportation (IDOT). During the 1978-79 winter, IDOT's snow removal budget was exhausted by the end of January, thereby necessitating the procurement of emergency funds. The following year, the Illinois State Water Survey (ISWS) was asked to provide specialized climatic design information that could be used to assist IDOT in its budget planning for snow removal.Snow removal is often accomplished by spreading road salt over snow- and ice-covered roads, thus improving traction and reducing the risk of vehicles skidding along slippery surfaces. This study demonstrates the computation of `salt days,' a user-oriented climatic variable that indicates the number of days when road salt is required. This variable is defined using certain temperature and snowfall criteria. Results of a pilot study indicate that it is possible to provide statistical outlooks for salt days two months in advance, using correlation analysis. The analysis for several Illinois stations indicates that at various intervals in the data records, November and December temperatures are significantly correlated with February salt days if short periods of record (5-20 years) are used.IDOT originally requested a `2- to 3-month projection.' However, it became clear that only projections of 12 months or longer could benefit annual budget preparation. Confusion existed between the user and the supplier of climatic information regarding the user's needs, and the applicability of the supplier's `climate products' to the user's budget planning procedure. This demonstrates the need for a prolonged effort by the supplier to fully acquaint the user with the various forms of climatic information available. This gap in communication must be overcome so that applied climatology can be integrated

  10. Neurocognitive impairment in deficit and non-deficit schizophrenia: a meta-analysis.

    Science.gov (United States)

    Bora, E; Binnur Akdede, B; Alptekin, K

    2017-10-01

    Most studies suggested that patients with deficit schizophrenia have more severe impairment compared with patients with non-deficit schizophrenia. However, it is not clear whether deficit and non-deficit schizophrenia are associated with differential neurocognitive profiles. The aim of this meta-analytic review was to compare cognitive performances of deficit and non-deficit patients with each other and with healthy controls. In the current meta-analysis, differences in cognitive abilities between 897 deficit and 1636 non-deficit patients with schizophrenia were examined. Cognitive performances of 899 healthy controls were also compared with 350 patients with deficit and 592 non-deficit schizophrenia. Both deficit (d = 1.04-1.53) and non-deficit (d = 0.68-1.19) schizophrenia were associated with significant deficits in all cognitive domains. Deficit patients underperformed non-deficit patients in all cognitive domains (d = 0.24-0.84) and individual tasks (d = 0.39-0.93). The relationship between deficit syndrome and impairment in olfaction, social cognition, verbal fluency, and speed-based cognitive tasks were relatively stronger. Our findings suggest that there is consistent evidence for a significant relationship between deficit syndrome and more severe cognitive impairment in schizophrenia.

  11. Mass and energy budgets of animals: Behavioral and ecological implications

    Energy Technology Data Exchange (ETDEWEB)

    Porter, W.P.

    1991-11-01

    The two major aims of our lab are as follows: First, to develop and field-test general mechanistic models that predict animal life history characteristics as influenced by climate and the physical, physiological behavioral characteristics of species. This involves: understanding how animal time and energy budgets are affected by climate and animal properties; predicting growth and reproductive potential from time and energy budgets; predicting mortality based on climate and time and energy budgets; and linking these individual based models to population dynamics. Second to conduct empirical studies of animal physiological ecology, particularly the effects of temperature on time and energy budgets. The physiological ecology of individual animals is the key link between the physical environment and population-level phenomena. We address the macroclimate to microclimate linkage on a broad spatial scale; address the links between individuals and population dynamics for lizard species; test the endotherm energetics and behavior model using beaver; address the spatial variation in climate and its effects on individual energetics, growth and reproduction; and address patchiness in the environment and constraints they may impose on individual energetics, growth and reproduction. These projects are described individually in the following section. 24 refs., 9 figs.

  12. Operational budgeting using fuzzy goal programming

    OpenAIRE

    Saeed Mohammadi; Kamran Feizi; Ali Khatami Firouz Abadi

    2013-01-01

    Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate oper...

  13. 24 CFR 84.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... transfer of funds among direct cost categories or programs, functions and activities for awards in which...) Change in the scope or the objective of the project or program (even if there is no associated budget...) The transfer of funds allotted for training allowances (direct payment to trainees) to other...

  14. 36 CFR 1210.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... may, at its option, restrict the transfer of funds among direct cost categories or programs, functions... or the objective of the project or program (even if there is no associated budget revision requiring... funds allotted for training allowances (direct payment to trainees) to other categories of expense. (8...

  15. Between Bedside and Budget

    NARCIS (Netherlands)

    J.L.T. Blank; E. Eggink

    1998-01-01

    Original title: Tussen bed en budget. The report Between bedside and budget (Tussen bed en budget) describes an extensive empirical study of the efficiency of general and university hospitals in the Netherlands. A policy summary recaps the main findings of the study. Those findings

  16. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices...... per main cost drivers were compared and analyzed. There were observed nine railway projects, comparable to the Copenhagen-Ringsted project. The results of this comparison provided a certain overview on the cost range in different budget disciplines. The Copenhagen-Ringsted project is positioned right...

  17. Operational budgeting using fuzzy goal programming

    Directory of Open Access Journals (Sweden)

    Saeed Mohammadi

    2013-10-01

    Full Text Available Having an efficient budget normally has different advantages such as measuring the performance of various organizations, setting appropriate targets and promoting managers based on their achievements. However, any budgeting planning requires prediction of different cost components. There are various methods for budgeting planning such as incremental budgeting, program budgeting, zero based budgeting and performance budgeting. In this paper, we present a fuzzy goal programming to estimate operational budget. The proposed model uses fuzzy triangular as well as interval number to estimate budgeting expenses. The proposed study of this paper is implemented for a real-world case study in province of Qom, Iran and the results are analyzed.

  18. Understanding the Budget Process

    OpenAIRE

    Mesut Yalvaç

    2000-01-01

    Many different budgeting techniques can be used in libraries, and some combination of these will be appropriate for almost any individual situation. Li-ne-item, program, performance, formula, variable, and zero-base budgets all have features that may prove beneficial in the preparation of a budget. Budgets also serve a variety of functions, providing for short-term and long-term financial planning as well as for cash management over a period of time. Short-term plans are reflected in the oper...

  19. Program Direction FY 2017 Budget At-A-Glance

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-03-01

    Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.

  20. Analysis of the Capital Budgeting Practices: Serbian Case

    Directory of Open Access Journals (Sweden)

    Lidija Barjaktarovic

    2016-09-01

    Full Text Available This paper addresses two major research questions: which techniques firms in Serbia use for project evaluation, and how the Serbian companies calculate their cost of capital. The authors have created the questionnaire and the sample consisting of 65 companies that responded to the enquiry (out of 392 during the year 2015. The results showed that payback criterion is the most dominant capital budgeting technique used by firms in Serbia. Further, the results revealed that large firms as well as multinational firms are more inclined to use discounted cash flow capital budgeting techniques and other sophisticated techniques. Finally, the authors have concluded that the CAPM is not the dominant method for calculating cost of capital by the companies from the sample analyzing the overall sample. Consequently, skilled human capital, the adequate knowledge and developed procedures may contribute to accepting capital budgeting techniques such as discounted cash flow analysis and other sophisticated techniques by larger portion of the companies in Serbia. Finally, existence of perfect financial market is a necessary precondition for implementing all these contemporary financial concepts and its development has to be posed as one of the priorities in the years to come.

  1. 10 CFR 600.315 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... revisions: (1) The transfer of funds among direct cost categories, functions, and activities for awards in... change in the scope or the objective of the project or program (even if there is no associated budget... accordance with the applicable costs principles for Federal funds and the requirements applicable to the...

  2. 7 CFR 3019.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... described in this paragraph (e) are automatically waived (i.e., recipients need not obtain such prior... the needs of the recipient for the project period by more than $5000 or five percent of the Federal... appropriate. (b) Recipients are required to report deviations from budget and program plans, and request prior...

  3. Great Basin paleoenvironmental studies project

    International Nuclear Information System (INIS)

    1993-01-01

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project

  4. System Budgets

    DEFF Research Database (Denmark)

    Jeppesen, Palle

    1996-01-01

    The lecture note is aimed at introducing system budgets for optical communication systems. It treats optical fiber communication systems (six generations), system design, bandwidth effects, other system impairments and optical amplifiers.......The lecture note is aimed at introducing system budgets for optical communication systems. It treats optical fiber communication systems (six generations), system design, bandwidth effects, other system impairments and optical amplifiers....

  5. The 'People's Budget' and Budget Effectiveness:The Case of Local ...

    African Journals Online (AJOL)

    All over the world, participatory budgeting is being advocated. This is based on the belief that stakeholders' participation in the budgeting process improves transparency, accountability and service delivery. Using evidence from 105 Civil Society Organisations (CSOs) in Kabalore and Kamwenge district local governments ...

  6. 42 CFR 457.140 - Budget.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Budget. 457.140 Section 457.140 Public Health... Child Health Insurance Programs and Outreach Strategies § 457.140 Budget. The State plan, or plan amendment that has a significant impact on the approved budget, must include a budget that describes the...

  7. Environmental budget and policy goal

    Energy Technology Data Exchange (ETDEWEB)

    Noh, Sang Hwan [Korea Environment Institute, Seoul (Korea)

    1998-12-01

    The assigned budget for environmental sector is quite insufficient to meet enormous environmental demand. Under this circumstance, there is only one way to solve environmental problems efficiently, i.e. to use a given budget efficiently. Therefore, the study on efficient utilization of a given environmental invested finance is needed by customizing a diagnosis of present condition on the operation of environmental budget and environmental investment analysis. In this respect, an entire national budget of 1999 and environmental budget were analyzed in this study. By analyzing economic efficiency of sewage disposal program, integrated septic tank system, VOC regulation, incinerator construction program, food waste disposal program, and recycling program, an efficient budget policy was presented. 19 refs., 18 figs., 169 tabs.

  8. Baseline budgeting for continuous improvement.

    Science.gov (United States)

    Kilty, G L

    1999-05-01

    This article is designed to introduce the techniques used to convert traditionally maintained department budgets to baseline budgets. This entails identifying key activities, evaluating for value-added, and implementing continuous improvement opportunities. Baseline Budgeting for Continuous Improvement was created as a result of a newly named company president's request to implement zero-based budgeting. The president was frustrated with the mind-set of the organization, namely, "Next year's budget should be 10 to 15 percent more than this year's spending." Zero-based budgeting was not the answer, but combining the principles of activity-based costing and the Just-in-Time philosophy of eliminating waste and continuous improvement did provide a solution to the problem.

  9. 32 CFR 34.15 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... prior approvals are not required): (i) The transfer of funds among direct cost categories, functions and... or the objective of the project or program (even if there is no associated budget revision requiring... principles for Federal funds and recipients' cost share or match, in § 34.17 and § 34.13, respectively. (iv...

  10. 49 CFR 19.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... described in paragraph (e) of this section are automatically waived (i.e., recipients need not obtain such... exceed the needs of the recipient for the project period by more than $5,000 or five percent of the...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  11. 29 CFR 95.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ...., recipients need not obtain such prior written approvals) unless one of the conditions included in paragraph... is expected to exceed the needs of the recipient for the project period by more than $5,000 or five...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  12. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  13. The AquaDEB project (phase I): Analysing the physiological flexibility of aquatic species and connecting physiological diversity to ecological and evolutionary processes by using Dynamic Energy Budgets

    OpenAIRE

    Alunno-bruscia, Marianne; Van Der Veer, Henk W.; Kooijman, Sebastiaan A.l.m.

    2009-01-01

    The European Research Project AquaDEB (2007–2011, http://www.ifremer.fr/aquadeb/) is joining skills and expertise of some French and Dutch research institutes and universities to analyse the physiological flexibility of aquatic organisms and to link it to ecological and evolutionary processes within a common theoretical framework for quantitative bioenergetics [Kooijman, S.A.L.M., 2000. Dynamic energy and mass budgets in biological systems. Cambridge University Press, Cambridge]. The main sci...

  14. Participatory Budgeting: Could It Diminish Health Disparities in the United States?

    Science.gov (United States)

    Hagelskamp, Carolin; Schleifer, David; Rinehart, Chloe; Silliman, Rebecca

    2018-05-07

    Participatory budgeting (PB)-a democratic process where ordinary residents decide directly how to spend part of a public budget-has gained impressive momentum in US municipalities, spreading from one pilot project in Chicago's 49th ward in 2009 to 50 active PB processes across 14 cities in 2016-2017. Over 93,600 US residents voted in a PB process in 2015-2016, deciding over a total of about $49.5 million and funding 264 projects intended to improve their communities. The vast majority of US PB processes take place in large urban centers (e.g., New York City, Chicago, Seattle, Boston), but PB has also recently spread to some smaller cities and towns [1]. Figure 1 illustrates the growth of PB processes in the USA, and within New York City and Chicago council districts specifically. Fig. 1 Participatory budgeting in the USA has grown from 1 process in 2009-2010 to 50 processes in 2016-2017 PB constitutes a rare form of public engagement in that it typically comprises several distinct stages that encourage residents to participate from project idea collection to project implementation (see Fig. 2). The decisive public vote in US PB is practically binding as elected officials commit to implementing the public decision at the outset of the process. Moreover, all current PB processes in the USA have expanded voting rights to residents under 18 years old and to non-citizens. Under President Obama, the White House recognized PB as a model for open governance. Participatory Budgeting Project, a nonprofit organization that advocates for PB, won the 2014 Brown Democracy Medal, which recognizes the best work being done to advance democracy in the USA and internationally. Fig. 2 Typical stages of a participatory budgeting process in the USA PB has been lauded for its potential to energize local democracy, contribute to more equitable public spending and help reduce inequality [2, 3]. Social justice goals have been explicit in US PB from the start. Grassroots advocates

  15. ‘FLEXIBLE’ BUDGETS ARE ALREADY BUDGETING PROCESS ANALYSIS OF PRODUCTION COSTS FOR OIL AND FAT ENTERPRISES

    Directory of Open Access Journals (Sweden)

    V. Shvetz’

    2013-10-01

    Full Text Available The problems of methodological fundamentals of managerial accounting of manufacturing costs in information provision for budgeting, not only at the enterprise level, but also as it is required by current conditions of advanced control, in the context of structural production units of “responsibility centers” using “flexible” budgets, which are prepared during the manufacturing process are examined. Unlike a simple comparison of the regular budgets (scheduled amount of work divided by regulatory costs per unit, “flexible” budget makes adjustments to the planned budget because it represents the actual amount of work divided by regulatory costs, which is included with the comparison of the amount of work that are not fulfilled, or carried to a greater or lesser extent compared with the expected budget. Thus, “Flexible” budgets reveal the actual extent of the changes compared with the expected budget.

  16. Daily Radiation Budget of the Baltic Sea Surface from Satellite Data

    Directory of Open Access Journals (Sweden)

    Zapadka Tomasz

    2015-09-01

    Full Text Available Recently developed system for assessment of radiation budget for the Baltic Sea has been presented and verified. The system utilizes data from various sources: satellite, model and in situ measurements. It has been developed within the SatBałtyk project (Satellite Monitoring of the Baltic Sea Environment - www.satbaltyk.eu where the energy radiation budget is one of the key element. The SatBałtyk system generates daily maps of the all components of radiation budget on every day basis. We show the scheme of making daily maps, applied algorithms and empirical data collection within the system. An empirical verification of the system has been carried out based on empirical data collected on the oil rig placed on the Baltic Sea. This verification concerned all the components of the surface radiation budget. The average daily NET products are estimated with statistical error ca. 13 Wm-2. The biggest absolute statistical error is for LWd component and equals 14 Wm-2. The relative error in relation to the average annual values for whole Baltic is the biggest for SWu and reaches 25%. All estimated components have correlation coefficient above 0.91.

  17. An Update to the Budget and Economic Outlook: 2014 to 2024

    Science.gov (United States)

    2014-08-01

    line) reflect the data available and projec- tions made before July 30. U.S. dollar and the currencies of major U.S. trading part- ners using shares of...U.S. trade as weights) in 2015 and later years will reduce the foreign- currency price of U.S. exports and increase the domestic price of U.S. imports...UPDATE TO THE BUDGET AND ECONOMIC OUTLOOK: 2014 TO 2024 AUGUST 2014 CBOEconomic Projections The economic projections were prepared by the Macroeconomic

  18. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  19. Nuclear budget for FY1991 up 3.6% to 409.7 billion yen

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    A total of yen409.7 billion was approved for the Governmental nuclear energy draft budget for fiscal 1991 on December 28, as the Cabinet gave its approval. The total, the highest ever, was divided into yen182.6 billion for the general account and yen227.1 billion for the special account for power resources development, representing a 3.6% increase over the ongoing fiscal year's level of yen395.5 billion. The draft budget will be examined for approval of the Diet session by the end of March. The nuclear energy budget devoted to research and development projects governed by the Science and Technology Agency amounts yen306.4 billion, up 3.5% exceeding yen300 billion for the first time. The nuclear budget for the Ministry of International Trade and Industry is yen98.1 billion, up 3.5%. For the other ministries, including the Ministry of Foreign Affairs, yen5.1 billion was allotted to nuclear energy-related projects. The Government had decided to raise the unit cost of the power plant siting promotion subsidies in the special account for power resources development by 25% --- from yen600/kw to yen750/kw --- in order to support the siting of plants. Consequently, the power resources siting account of the special accounts for both STA and MITI showed high levels of growth rates: 6.3% and 7.5%, respectively. (N.K.)

  20. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  1. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  2. [Transparency as a prerequisite of innovation in health services research: deficits in the reporting of model projects concerning managed care].

    Science.gov (United States)

    Wiethege, J; Ommen, O; Ernstmann, N; Pfaff, H

    2010-10-01

    Currently, elements of managed care are being implemented in the German health-care system. The legal basis for these innovations are § 140, § 73, § 137, and §§ 63 et seq. of the German Social Code - Part 5 (SGB V). For the model projects according to §§ 63 et seq. of the German Social Code a scientific evaluation and publication of the evaluation results is mandatory. The present study examines the status of evaluation of German model projects. The present study has a mixed method design: A mail and telephone survey with the German Federal Social Insurance Authority, the health insurance funds, and the regional Associations of Statutory Health Insurance Physicians has been conducted. Furthermore, an internet research on "Medpilot" and "Google" has been accomplished to search for model projects and their evaluation reports. 34 model projects met the inclusion criteria. 13 of these projects had been terminated up to 30/9/2008. 6 of them have published an evaluation report. 4 model projects have published substantial documents. One model project in progress has published a meaningful interim report. 12 model projects failed to give information concerning the evaluator or the duration of the model projects. The results show a significant deficit in the mandatory reporting of the evaluation of model projects in Germany. There is a need for action for the legislator and the health insurance funds in terms of promoting the evaluation and the publication of the results. The institutions evaluating the model projects should obligate themselves to publish the evaluation results. The publication is an essential precondition for the development of managed care structures in the health-care system and in the development of scientific evaluation methods. © Georg Thieme Verlag KG Stuttgart · New York.

  3. The Global Methane Budget 2000-2012

    Science.gov (United States)

    Saunois, Marielle; Bousquet, Philippe; Poulter, Benjamin; Peregon, Anna; Ciais, Philippe; Canadell, Josep G.; Dlugokencky, Edward J.; Etiope, Giuseppe; Bastviken, David; Houweling, Sander; hide

    2016-01-01

    The global methane (CH4) budget is becoming an increasingly important component for managing realistic pathways to mitigate climate change. This relevance, due to a shorter atmospheric lifetime and a stronger warming potential than carbon dioxide, is challenged by the still unexplained changes of atmospheric CH4 over the past decade. Emissions and concentrations of CH4 are continuing to increase, making CH4 the second most important human-induced greenhouse gas after carbon dioxide. Two major difficulties in reducing uncertainties come from the large variety of diffusive CH4 sources that overlap geographically, and from the destruction of CH4 by the very short-lived hydroxyl radical (OH). To address these difficulties, we have established a consortium of multi-disciplinary scientists under the umbrella of the Global Carbon Project to synthesize and stimulate research on the methane cycle, and producing regular (approximately biennial) updates of the global methane budget. This consortium includes atmospheric physicists and chemists, biogeochemists of surface and marine emissions, and socio-economists who study anthropogenic emissions. Following Kirschke et al. (2013), we propose here the first version of a living review paper that integrates results of top-down studies (exploiting atmospheric observations within an atmospheric inverse-modeling framework) and bottom-up models, inventories and data-driven approaches (including process-based models for estimating land surface emissions and atmospheric chemistry, and inventories for anthropogenic emissions, data-driven extrapolations).For the 2003-2012 decade, global methane emissions are estimated by top-down inversions at 558 TgCH4 yr(exp -1), range 540-568. About 60 of global emissions are anthropogenic (range 50-65%). Since 2010, the bottom-up global emission inventories have been closer to methane emissions in the most carbon-intensive Representative Concentrations Pathway (RCP8.5) and higher than all other RCP

  4. Zero-Base Budgeting:; An Institutional Experience.

    Science.gov (United States)

    Alexander, Donald L.; Anderson, Roger C.

    Zero-base budgeting as it is used at Allegany College is described. Zero-based budgeting is defined as a budgeting and planning approach that requires the examination of every item in a budget request as if the request were being proposed for the first time. Budgets (decision packages) are first made up for decision units (i.e., a course for the…

  5. AFRICAN JOURNAL OF ECONOMIC REVIEW

    African Journals Online (AJOL)

    Dr Kazungu

    invested in projects with direct future cash flows. ... early1990s, a string of budget deficits, rising debt and high debt service burden, rapid growth in ... fiscal and monetary management, and the availability of development assistance (CEPA, ...

  6. Money Talks: Gender Budgeting in the University of Iceland

    Directory of Open Access Journals (Sweden)

    Finnborg S. Jónasdóttir

    2016-06-01

    Full Text Available The article addresses the financial framework, decision-making and budgeting processes of the University of Iceland from a gender perspective. The newly appointed rector of the University of Iceland (elected 2015 together with the university council is currently revising the UI system of the distribution formula of budget allocation. This provides an opportunity to examine the system which is inspired by New Public Management, with emphasis on global competition and performance based indicators. The aim of the article is to scrutinize the current system of budget allocation and distribution and its significance when it comes to gender. We ask how the, allegedly gender neutral, system plays out for different schools and disciplines and for academics in different ranks, when the gender dimension is taken into account. We draw on empirical data collected as part of the GARCIA research project, Gendering the Academy and Research combating Career Instability and Asymmetries, which is supported by the 7th Framework Programme of the European Union. To shed a light on the process we focus on the male-dominated School of Engineering and Natural Sciences (SENS and the more feminised School of Social Sciences (SSS. The exploration shows that the financial framework, decision-making and budgeting processes at the University of Iceland are rather non-transparent, and biased in favour of the natural sciences. This applies to funding from the state; third party funding; the allocation of funding in the teaching part of the budgeting, as well as the research part. From the article it can be concluded that the current system contains an internal, though unintended, gender bias that needs to be corrected.

  7. Under Secretary of Defense (Comptroller) > Budget

    Science.gov (United States)

    functionalStatements OUSD(C) History FMR Budget Materials Budget Execution Financial Management Improving Financial Performance Reports Regulations Press Release | Budget Briefing | Transcripts: David L. Norquist, Under PDF document. Click on Excel icon for Excel document Overview - FY2019 Defense Budget Performance

  8. Budget goal commitment, clinical managers' use of budget information and performance.

    Science.gov (United States)

    Macinati, Manuela S; Rizzo, Marco G

    2014-08-01

    Despite the importance placed on accounting as a means to influence performance in public healthcare, there is still a lot to be learned about the role of management accounting in clinical managers' work behavior and their link with organizational performance. The article aims at analyzing the motivational role of budgetary participation and the intervening role of individuals' mental states and behaviors in influencing the relationship between budgetary participation and performance. According to the goal-setting theory, SEM technique was used to test the relationships among variables. The data were collected by a survey conducted in an Italian hospital. The results show that: (i) budgetary participation does not directly influence the use of budget information, but the latter is encouraged by the level of budget goal commitment which, as a result, is influenced by the positive motivational consequences of participative budgeting; (ii) budget goal commitment does not directly influence performance, but the relationship is mediated by the use of budget information. This study contributes to health policy and management accounting literature and has significant policy implications. Mainly, the findings prove that the introduction of business-like techniques in the healthcare sector can improve performance if attitudinal and behavioral variables are adequately stimulated. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  9. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  10. Scientific and theoretical principles of personnel costs’ budgeting

    Directory of Open Access Journals (Sweden)

    O.P. Gutsal

    2015-06-01

    Full Text Available The object of this article is to determine the main purpose of company’s budgeting, to study its functions in terms of personnel management, to identify the main advantages and disadvantages of budgeting and to determine the stages of realization budgeting in the company. There have been considered the purpose and aim of budgeting. The main functions of budgeting, which include such ones as: planning, forecasting, information and analysis function, motivational, coordinative, control and involvement function have been identified (determined. In terms of defined functions of budgeting their essence in budgeting personnel costs has been outlined. The main advantages and disadvantages of budgeting have been found. There has been determined the implementing and realization company’s budgeting. The process of budgeting is realized according to the following consecutive stages: preparatory and analytical stage; definition of budget constraints; drafting up the budget; discussion and adjustment of budget indicators; adoption of budget; analysis and control of the budget. There also has been considered budget organization structure which includes budget committee, budget planning and analysis department, financial responsibility center.

  11. The SOLEIL project

    International Nuclear Information System (INIS)

    2001-01-01

    The SOLEIL project is built around an optimized 2,5 GeV positron storage ring with its own injector, i-e, a linear accelerator and a booster. This paper gathers information on the main characteristics of the project and more specially on the budget, the staff, the overall time table and a presentation of the Synchrotron Soleil Society. (A.L.B.)

  12. THE BUDGETING PROCESS IN ROMANIA

    Directory of Open Access Journals (Sweden)

    TURCIN MARIUS CATALIN

    2015-08-01

    Full Text Available This paper presents the stages of the budgeting process in Romania and the institutions involved in its carry out, having regard to the recent legislative amendments in the field. The study describes the importance of some state institutions in achieving the economic and social policy objectives. According to practice, the institution specializing in drafting the budget bill is the Government, who submits the budget bill annually to the Parliament for adopting the national budget, accompanied by the explanatory statement, annexes and interpretative calculations. The preparatory works are fulfilled by the Ministry of Public Finance and in parallel, by the ministries, authorities, local administrations or other public institutions to prepare their own drafts budget.

  13. Investigating effect of environmental controls on dynamics of CO2 budget in a subtropical estuarial marsh wetland ecosystem

    Science.gov (United States)

    Lee, Sung-Ching; Fan, Chao-Jung; Wu, Zih-Yi; Juang, Jehn-Yih

    2015-02-01

    In this study, we quantified the ecosystem-scale CO2 exchange of two different but typical low-latitude vegetation types, para grass and reed, in a subtropical wetland ecosystem by integrating flux observation with the parameterization of environmental variables. In addition, we explored how seasonal dynamics of environmental factors affected variations in CO2 budget. The results suggest that gross primary production (GPP, in the order of 1700 gC m-2 yr-1) of CO2 was higher in this site than in previous studies of northern peatlands and estuarial wetlands because of the direct effect of environmental factors. Temperature and radiation had a larger effect than water status (soil moisture content and vapor pressure deficit) on GPP for the two low-latitude ecosystems, which differ from the results for high-latitude regions. Environmental variables had a strong but different impact on the CO2 budget for para grass and reed areas. This diversity led to different potential shifts and trends of biomass accumulation and distribution of these two typical low-latitude vegetation types under different scenarios of environmental change. The findings from this study can sufficiently provide quantitative understanding of CO2 budgets in low-latitude wetlands.

  14. Fiscal Year 2015 Budget

    Data.gov (United States)

    Montgomery County of Maryland — This dataset includes the Fiscal Year 2015 Council-approved operating budget for Montgomery County. The dataset does not include revenues and detailed agency budget...

  15. Soft Budget Constraints in Public Hospitals.

    Science.gov (United States)

    Wright, Donald J

    2016-05-01

    A soft budget constraint arises when a government is unable to commit to not 'bailout' a public hospital if the public hospital exhausts its budget before the end of the budget period. It is shown that if the political costs of a 'bailout' are relatively small, then the public hospital exhausts the welfare-maximising budget before the end of the budget period and a 'bailout' occurs. In anticipation, the government offers a budget to the public hospital that may be greater than or less than the welfare-maximising budget. In either case, the public hospital treats 'too many' elective patients before the 'bailout' and 'too few' after. The introduction of a private hospital reduces the size of any 'bailout' and increases welfare. Copyright © 2015 John Wiley & Sons, Ltd.

  16. Projected Changes in Evapotranspiration Rates over Northeast Brazil

    Science.gov (United States)

    Costa, Alexandre; Guimarães, Sullyandro; Vasconcelos, Francisco, Jr.; Sales, Domingo; da Silva, Emerson

    2015-04-01

    Climate simulations were performed using a regional model (Regional Atmospheric Modeling System, RAMS 6.0) driven by data from one of the CMIP5 models (Hadley Centre Global Environmental Model, version 2 - Earth System, HadGEM2-ES) over two CORDEX domains (South America and Central America) for the heavy-emission scenario (RCP8.5). Potential evapotranspiraion data from the RCM and from the CMIP5 global models were analyzed over Northeast Brazil, a semiarid region with a short rainy season (usually February to May in its northern portion due to the seasonal shift of the Intertropical Convergence Zone) and over which droughts are frequent. Significant changes in the potential evapotranspiration were found, with most models showing a increasing trend along the 21st century, which are expected to alter the surface water budget, increasing the current water deficit (precipitation is currently much smaller than potential evapotranspiration). Based on the projections from the majority of the models, we expect important impacts over local agriculture and water resources over Northeast Brazil.

  17. Character of t-cell immune deficit spread among Semipalatinsk nuclear test site population and the possibilities of the correction

    International Nuclear Information System (INIS)

    Abdrahmanov, J.; Tsai, E.; Zaitsev, V.; Mamadaliev, S.; Popov, L.; Sukurov, B.

    1996-01-01

    Objectives of the project: The first objective is clearing of state of immune system of humans exposed to gamma radiation during long period of their life in Semipalatinsk province. The second objective is establishing relations between type of disorders of immune system and rate of particular diseases. The third objective is development of method of the treatment of immuno deficits via plasmaphaeresis in residents with postradiation immune disorders. Scientific and technical approaches based on following tasks: Completing of large scale examination of immune system of residents of Semipalatinsk province Evaluating of immuno deficit's types of people affected from consequences of nuclear explosions in Semipalatinsk polygon Analysis of diseases rates and evaluating of correlation between particular diseases and type of immune disorders Development of rehabilitation methods in experimental animals exposed to different radiation dose during different period of time Development of experimental model of main postradiation immuno deficits and analysis of morbidity linked with immune disorders Experimental trial of plasmaphaeresis and analysis of morbidity changes in animals Clinical trial of plasmaphaeresis in patients with postradiation immuno deficits and analysis clinical responses Project will use: histochemical assay for identification of main subpopulations of T lymphocytes immunochemical assay for evaluated of serum concentration of immunoglobulins of types A,M,G dosimetric methods, limited gamma radiation of experimental animals, computerized data processing experimental and clinical trials using plasmaphaeresis. Possible results: The project will evaluate of characters and types of postradiation T immuno deficits and their correlation with definite diseases, which can be geographic health problem for regions polluted with radioactive wastes. Also, a new methods for determination of T immuno deficit will be developed. Existed data, concerning to project from

  18. Cycle-Based Budgeting Toolkit: A Primer

    Science.gov (United States)

    Yan, Bo

    2016-01-01

    At the core, budgeting is about distributing and redistributing limited financial resources for continuous improvement. Incremental budgeting is limited in achieving the goal due to lack of connection between outcomes and budget decisions. Zero-based budgeting fills the gap, but is cumbersome to implement, especially for large urban school…

  19. Continuity of Earth Radiation Budget Observations

    Science.gov (United States)

    Loeb, N. G.; Su, W.; Wong, T.; Priestley, K.

    2017-12-01

    Earth's climate is determined by the exchange of radiant energy between the Sun, Earth and space. The absorbed solar radiation at the top-of-atmosphere (TOA) fuels the climate system, providing the energy required for atmospheric and oceanic motions. Earth's radiation budget (ERB) involves a balance between how much solar energy Earth absorbs and how much terrestrial thermal infrared radiation is emitted to space. Because of its critical role in climate, continuous monitoring of the ERB is necessary for improved understanding and prediction of climate variability and change. NASA's long history in observing the TOA ERB is acknowledged in the 2007 and 2013 reports of the IPCC (IPCC 2007, 2013), the 2007 NRC Decadal Survey (NRC 2007), and the GCOS implementation plan of the WMO (GCOS 2016). A key reason for NASA's success in this area is due to its support of the CERES Project and its predecessor, ERBE. During ERBE, the TOA ERB was observed using both scanner and nonscanner broadband instruments. The CERES project consists of six scanner instruments flying alongside high-resolution spectral imagers (MODIS, VIIRS) in morning and afternoon sun-synchronous orbits. In addition to extending the ERBE TOA radiation budget record, CERES also provides observations of Earth's surface radiation budget with unprecedented accuracy. Here we assess the likelihood of a measurement gap in the ERB record. We show that unless a follow-on ERB instrument to the last available CERES copy (FM6) is built and launched, there is a significant risk of a measurement gap in the ERB record by the mid-2020s. A gap is of concern not only because the ERB would not be monitored during the gap period but also because it would be exceedingly difficult to tie the records before and after the gap together with sufficient accuracy for climate analyses. While ERB instruments are highly stable temporally, they lack the absolute accuracy needed to bridge a gap. Consequently, there is a requirement that

  20. The prevalence of Beyond Budgeting in Denmark

    DEFF Research Database (Denmark)

    Sandalgaard, Niels

      The annual budget has been criticised in recent years. The critics claim, among other things, that the annual budget is not suitable for today's business environment, that annual budgets stimulate dysfunctional behaviour and furthermore that the use of budgets is too costly. This paper examines...... this critique as well as the current status of the traditional annual budget in a contingency perspective by using data from a survey among the largest Danish companies. The conclusion is that only 4% of the companies claim to have abandoned the traditional, annual budget, 2% have decided or are in the process...... of doing so and 11% are considering abandoning it. These "Beyond Budgeting" companies are more critical towards the traditional budget than other companies. The study also shows that the critical attitude towards annual budgets as well as the decision of abandoning the budget cannot be associated...

  1. 7 CFR 906.33 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 906.33 Section 906.33 Agriculture Regulations... GRANDE VALLEY IN TEXAS Order Regulating Handling Expenses and Assessments § 906.33 Budget. At the... budget of income and expenditures necessary for the administration of this part. The committee shall...

  2. 7 CFR 1744.64 - Budget adjustment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Budget adjustment. 1744.64 Section 1744.64... Disbursement of Funds § 1744.64 Budget adjustment. (a) If more funds are required than are available in a budget account, the borrower may request RUS's approval of a budget adjustment to use funds from another...

  3. 7 CFR 956.41 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 956.41 Section 956.41 Agriculture Regulations... OF SOUTHEAST WASHINGTON AND NORTHEAST OREGON Expenses and Assessments § 956.41 Budget. Prior to each fiscal period and as may be necessary thereafter, the committee shall prepare an estimated budget of...

  4. 7 CFR 945.41 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 945.41 Section 945.41 Agriculture Regulations... COUNTIES IN IDAHO, AND MALHEUR COUNTY, OREGON Order Regulating Handling Budget, Expenses and Assessments § 945.41 Budget. At the beginning of each fiscal period, and as may be necessary thereafter, the...

  5. 7 CFR 958.41 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 958.41 Section 958.41 Agriculture Regulations... Budget. Prior to each fiscal period, and as may be necessary thereafter the committee shall prepare a budget of estimated income and expenditures necessary for the administration of this part. The committee...

  6. 7 CFR 966.41 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 966.41 Section 966.41 Agriculture Regulations... Handling Expenses and Assessments § 966.41 Budget. At the beginning of each fiscal period and as may be necessary thereafter, the committee shall prepare an estimated budget of income and expenditures necessary...

  7. 7 CFR 948.76 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 948.76 Section 948.76 Agriculture Regulations... Regulating Handling Expenses and Assessments § 948.76 Budget. As soon as practicable after the beginning of... budget of income and expenditures necessary for its administration of this part. Each area committee may...

  8. 7 CFR 959.41 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 959.41 Section 959.41 Agriculture Regulations... Handling Expenses and Assessments § 959.41 Budget. As soon as practicable after the beginning of each fiscal period and as may be necessary thereafter, the committee shall prepare an estimated budget of...

  9. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  10. Fiscal 1987 nuclear budget request amounts to 366 billion yen; increased 2.7 %

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The 1987 budget request was submitted to the Ministry of Finance by the end of August, 1986. Of the total, the nuclear budget request made by eight ministries and agencies totaled 366,896 million yen, 2.7 % increase over the previous year, which consists of 184,715 million yen in the general account, 0.6 % down, and 182,180 million yen in the special account for power resource development, 6.3 % up. The increase rate was kept at a low level in consideration of the tight government financial condition. The request was approved on September 9 by the Atomic Energy Commission, which is responsible for securing the budget for the peaceful uses of nuclear energy. The government draft budget is expected to be finalized by the end of 1986 on the basis of the draft of the Ministry of Finance. The Science and Technology Agency request is 277,934 million yen, 1.0 % increase, and the project costs for Japan Atomic Energy Research Institute and Power Reactor and Nuclear Fuel Development Corp. account for its 88.3 %. The 1987 nuclear budget request by the Ministry of International Trade and Industry is mostly on the special account for power resource siting and power resource diversification, totaling 88,400 million yen. (Kako, I.)

  11. Motivation in Beyond Budgeting: A Motivational Paradox?

    DEFF Research Database (Denmark)

    Sandalgaard, Niels; Bukh, Per Nikolaj

    In this paper we discuss the role of motivation in relation to budgeting and we analyse how the Beyond Budgeting model functions compared with traditional budgeting. In the paper we focus on budget related motivation (and motivation in general) and conclude that the Beyond Budgeting model...

  12. 24 CFR 968.225 - Budget revisions.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Budget revisions. 968.225 Section... Fewer Than 250 Units) § 968.225 Budget revisions. (a) A PHA shall not incur any modernization cost in excess of the total HUD-approved CIAP budget. A PHA shall submit a budget revision, in a form prescribed...

  13. The Energetic Value of Land-Based Foods in Western Hudson Bay and Their Potential to Alleviate Energy Deficits of Starving Adult Male Polar Bears.

    Directory of Open Access Journals (Sweden)

    Linda J Gormezano

    Full Text Available Climate change is predicted to expand the ice-free season in western Hudson Bay and when it grows to 180 days, 28-48% of adult male polar bears are projected to starve unless nutritional deficits can be offset by foods consumed on land. We updated a dynamic energy budget model developed by Molnar et al. to allow influx of additional energy from novel terrestrial foods (lesser snow geese, eggs, caribou that polar bears currently consume as part of a mixed diet while on land. We calculated the units of each prey, alone and in combination, needed to alleviate these lethal energy deficits under conditions of resting or limited movement (2 km d-1 prior to starvation. We further considered the total energy available from each sex and age class of each animal prey over the period they would overlap land-bound polar bears and calculated the maximum number of starving adult males that could be sustained on each food during the ice-free season. Our results suggest that the net energy from land-based food, after subtracting costs of limited movement to obtain it, could eliminate all projected nutritional deficits of starving adult male polar bears and likely other demographic groups as well. The hunting tactics employed, success rates as well as behavior and abundance of each prey will determine the realized energetic values for individual polar bears. Although climate change may cause a phenological mismatch between polar bears and their historical ice-based prey, it may simultaneously yield a new match with certain land-based foods. If polar bears can transition their foraging behavior to effectively exploit these resources, predictions for starvation-related mortality may be overestimated for western Hudson Bay. We also discuss potential complications with stable-carbon isotope studies to evaluate utilization of land-based foods by polar bears including metabolic effects of capture-related stress and consuming a mixed diet.

  14. The Energetic Value of Land-Based Foods in Western Hudson Bay and Their Potential to Alleviate Energy Deficits of Starving Adult Male Polar Bears.

    Science.gov (United States)

    Gormezano, Linda J; Rockwell, Robert F

    2015-01-01

    Climate change is predicted to expand the ice-free season in western Hudson Bay and when it grows to 180 days, 28-48% of adult male polar bears are projected to starve unless nutritional deficits can be offset by foods consumed on land. We updated a dynamic energy budget model developed by Molnar et al. to allow influx of additional energy from novel terrestrial foods (lesser snow geese, eggs, caribou) that polar bears currently consume as part of a mixed diet while on land. We calculated the units of each prey, alone and in combination, needed to alleviate these lethal energy deficits under conditions of resting or limited movement (2 km d-1) prior to starvation. We further considered the total energy available from each sex and age class of each animal prey over the period they would overlap land-bound polar bears and calculated the maximum number of starving adult males that could be sustained on each food during the ice-free season. Our results suggest that the net energy from land-based food, after subtracting costs of limited movement to obtain it, could eliminate all projected nutritional deficits of starving adult male polar bears and likely other demographic groups as well. The hunting tactics employed, success rates as well as behavior and abundance of each prey will determine the realized energetic values for individual polar bears. Although climate change may cause a phenological mismatch between polar bears and their historical ice-based prey, it may simultaneously yield a new match with certain land-based foods. If polar bears can transition their foraging behavior to effectively exploit these resources, predictions for starvation-related mortality may be overestimated for western Hudson Bay. We also discuss potential complications with stable-carbon isotope studies to evaluate utilization of land-based foods by polar bears including metabolic effects of capture-related stress and consuming a mixed diet.

  15. Future projections of the surface heat and water budgets of the Mediterranean Sea in an ensemble of coupled atmosphere-ocean regional climate models

    Energy Technology Data Exchange (ETDEWEB)

    Dubois, C.; Somot, S.; Deque, M.; Sevault, F. [CNRM-GAME, Meteo-France, CNRS, Toulouse (France); Calmanti, S.; Carillo, A.; Dell' Aquilla, A.; Sannino, G. [ENEA, Rome (Italy); Elizalde, A.; Jacob, D. [Max Planck Institute for Meteorology, Hamburg (Germany); Gualdi, S.; Oddo, P.; Scoccimarro, E. [INGV, Bologna (Italy); L' Heveder, B.; Li, L. [Laboratoire de Meteorologie Dynamique, Paris (France)

    2012-10-15

    Within the CIRCE project ''Climate change and Impact Research: the Mediterranean Environment'', an ensemble of high resolution coupled atmosphere-ocean regional climate models (AORCMs) are used to simulate the Mediterranean climate for the period 1950-2050. For the first time, realistic net surface air-sea fluxes are obtained. The sea surface temperature (SST) variability is consistent with the atmospheric forcing above it and oceanic constraints. The surface fluxes respond to external forcing under a warming climate and show an equivalent trend in all models. This study focuses on the present day and on the evolution of the heat and water budget over the Mediterranean Sea under the SRES-A1B scenario. On the contrary to previous studies, the net total heat budget is negative over the present period in all AORCMs and satisfies the heat closure budget controlled by a net positive heat gain at the strait of Gibraltar in the present climate. Under climate change scenario, some models predict a warming of the Mediterranean Sea from the ocean surface (positive net heat flux) in addition to the positive flux at the strait of Gibraltar for the 2021-2050 period. The shortwave and latent flux are increasing and the longwave and sensible fluxes are decreasing compared to the 1961-1990 period due to a reduction of the cloud cover and an increase in greenhouse gases (GHGs) and SSTs over the 2021-2050 period. The AORCMs provide a good estimates of the water budget with a drying of the region during the twenty-first century. For the ensemble mean, he decrease in precipitation and runoff is about 10 and 15% respectively and the increase in evaporation is much weaker, about 2% compared to the 1961-1990 period which confirm results obtained in recent studies. Despite a clear consistency in the trends and results between the models, this study also underlines important differences in the model set-ups, methodology and choices of some physical parameters inducing

  16. FLEXIBLE BUDGET OF SPORT COMPETITIONS

    Directory of Open Access Journals (Sweden)

    Dragan Vukasović

    2009-11-01

    Full Text Available Manager of sport competition has right to decide and also to take responsibility for costs, income and financial results. From economic point of wiev flexible budget and planning cost calculations is top management base for analyzing success level of sport competition. Flexible budget is made before sport competition with few output level, where one is always from static plan-master plan. At the end of competition when we have results, we make report of plan executing and we also analyzing plan variances. Results of comparation between achieved and planning level of static budget can be acceptable if achieved level is approximate to budget level or if we analyzing results from gross or net income. Flexible budget become very important in case of world eco- nomic crises

  17. 25 CFR 122.7 - Budget.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Budget. 122.7 Section 122.7 Indians BUREAU OF INDIAN... § 122.7 Budget. (a) By August 1 of each year, the Osage Tribal Education Committee will submit a proposed budget to the Assistant Secretary or to his/her designated representative for formal approval...

  18. 7 CFR 955.41 - Budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Budget. 955.41 Section 955.41 Agriculture Regulations... Assessments § 955.41 Budget. At least 60 days prior to each fiscal period, or such other date as may be... budget of income and expenditures necessary for the administration of this part. The committee may...

  19. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  20. Beyond Zero Based Budgeting.

    Science.gov (United States)

    Ogden, Daniel M., Jr.

    1978-01-01

    Suggests that the most practical budgeting system for most managers is a formalized combination of incremental and zero-based analysis because little can be learned about most programs from an annual zero-based budget. (Author/IRT)

  1. Perspective-taking deficits in people with schizophrenia spectrum disorders: a prospective investigation

    DEFF Research Database (Denmark)

    Schiffman, Jason; Lam, Cecilia W; Jiwatram, Tina

    2004-01-01

    BACKGROUND: This study examined data from a Danish prospective longitudinal project in attempt to address the state/trait controversy regarding theory of mind deficits in schizophrenia. Deficits in perspective-taking--a component of theory of mind--were investigated prospectively among children who......-psychotic disorder. CONCLUSIONS: Deficits in perspective-taking among children who later developed schizophrenia spectrum disorders suggest that a facet of theory of mind is impaired prior to development of schizophrenia. Our findings lend support to the hypothesis that theory of mind deficits in schizophrenia...... developed schizophrenia spectrum disorders as adults in comparison to children who did not develop schizophrenia spectrum disorders. METHOD: A total of 265 high risk and control subjects were studied in 1972. At the time of initial assessment, the Role-Taking Task (RTT) was administered. Two hundred...

  2. Zero-base budgeting and the library.

    Science.gov (United States)

    Sargent, C W

    1978-01-01

    This paper describes the application of zero-base budgeting to libraries and the procedures involved in setting up this type of budget. It describes the "decision packages" necessary when this systmem is employed, as well as how to rank the packages and the problems which are related to the process. Zero-base budgeting involves the entire staff of a library, and the incentive engendered makes for a better and more realistic budget. The paper concludes with the problems which one might encounter in zero-base budgeting and the major benefits of the system. PMID:626795

  3. The sea ice mass budget of the Arctic and its future change as simulated by coupled climate models

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Marika M. [National Center for Atmospheric Research, Boulder, CO (United States); Serreze, Mark C.; Stroeve, Julienne [University of Colorado, National Snow and Ice Data Center, Cooperative Institute for Research in Environmental Sciences, Boulder, CO (United States)

    2010-02-15

    Arctic sea ice mass budgets for the twentieth century and projected changes through the twenty-first century are assessed from 14 coupled global climate models. Large inter-model scatter in contemporary mass budgets is strongly related to variations in absorbed solar radiation, due in large part to differences in the surface albedo simulation. Over the twenty-first century, all models simulate a decrease in ice volume resulting from increased annual net melt (melt minus growth), partially compensated by reduced transport to lower latitudes. Despite this general agreement, the models vary considerably regarding the magnitude of ice volume loss and the relative roles of changing melt and growth in driving it. Projected changes in sea ice mass budgets depend in part on the initial (mid twentieth century) ice conditions; models with thicker initial ice generally exhibit larger volume losses. Pointing to the importance of evolving surface albedo and cloud properties, inter-model scatter in changing net ice melt is significantly related to changes in downwelling longwave and absorbed shortwave radiation. These factors, along with the simulated mean and spatial distribution of ice thickness, contribute to a large inter-model scatter in the projected onset of seasonally ice-free conditions. (orig.)

  4. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  5. Fiscal 1988 draft budget for nuclear energy up 1.9% to yen 369 billion

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    AT the cabinet meeting held on December 28, the government approved the fiscal 1988 draft budget, with a general account of yen 56.6 trillion. The nuclear energy related budget is yen 181.124 billion from the general account and yen 186.098 billion from the special account for power sources development, totalling yen 367.222 billion, up 1.9% on the previous year. The largest appropriation goes to the Science and Technology Agency (STA) totaling yen 271 billion. The STA is promoting safety studies and R and D for extensive nuclear energy utilization but the budget shows a 0.7% decrease from the previous year, reflecting completion of the construction of JT-60, which is one of the Agency's major projects. MITI, with its budget of yen 91 billion will carry on policies related to the promotion of commercial nuclear power program as well as support for the industrialization program of the nuclear fuel cycle. Nuclear related budget of Ministry of Foreign Affairs is yen 2.8 billion, consisting mainly of IAEA subscriptions and contributions and OECD/NEA subscriptions. Besides these three government agencies, a large sum of yen 1.2 billion is allocated to the Okinawa Development Agency for the prevention and elimination of melon-flies in Kume Island and islands around Okinawa main island. The draft government budget will be submitted to the ordinary session of the Diet when it resumes towards the end of January. After deliberation in the Budget Committees of the House of Representatives and the House of Councilors, the draft budget will be put to the vote in the plenary session. Assuming that all proceeds smoothly, the budget is expected to be approved by the end of March without any major revision. (author)

  6. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  7. FY 1997 congressional budget request: Budget highlights

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This is an overview of the 1997 budget request for the US DOE. The topics of the overview include a policy overview, the budget by business line, business lines by organization, crosswalk from business line to appropriation, summary by appropriation, energy supply research and development, uranium supply and enrichment activities, uranium enrichment decontamination and decommissioning fund, general science and research, weapons activities, defense environmental restoration and waste management, defense nuclear waste disposal, departmental administration, Office of the Inspector General, power marketing administrations, Federal Energy Regulatory commission, nuclear waste disposal fund, fossil energy research and development, naval petroleum and oil shale reserves, energy conservation, economic regulation, strategic petroleum reserve, energy information administration, clean coal technology and a Department of Energy Field Facilities map.

  8. Verification of uncertainty budgets

    DEFF Research Database (Denmark)

    Heydorn, Kaj; Madsen, B.S.

    2005-01-01

    , and therefore it is essential that the applicability of the overall uncertainty budget to actual measurement results be verified on the basis of current experimental data. This should be carried out by replicate analysis of samples taken in accordance with the definition of the measurand, but representing...... the full range of matrices and concentrations for which the budget is assumed to be valid. In this way the assumptions made in the uncertainty budget can be experimentally verified, both as regards sources of variability that are assumed negligible, and dominant uncertainty components. Agreement between...

  9. Software project estimation the fundamentals for providing high quality information to decision makers

    CERN Document Server

    Abran, Alain

    2015-01-01

    Software projects are often late and over-budget and this leads to major problems for software customers. Clearly, there is a serious issue in estimating a realistic, software project budget. Furthermore, generic estimation models cannot be trusted to provide credible estimates for projects as complex as software projects. This book presents a number of examples using data collected over the years from various organizations building software. It also presents an overview of the non-for-profit organization, which collects data on software projects, the International Software Benchmarking Stan

  10. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  11. Rapid Budget Analysis of the Agricultural Sector for the General Budget Support Annual Review 2010/11

    OpenAIRE

    Francken, Nathalie; Zorya, S

    2010-01-01

    The main objective of the budget analysis chapter is to provide an overall assessment of how well the approved budget allocations in 2010-11 align with the strategic objectives and with sector strategic priorities of the Second National Strategy for Growth and Reduction of Poverty (known by its Kiswahili acronym, MKUKUTA II). It also assesses the consistency of the actual spending and approved budget in 2009-10. In evaluating the alignment of the budget and MKUKUTA's strategic objectives and ...

  12. Banking Competition and Soft Budget Constraints: How Market Power can Threaten Discipline in Lending

    NARCIS (Netherlands)

    Arping, S.

    2012-01-01

    n imperfectly competitive credit markets, banks can face a tradeoff between exploiting their market power and enforcing hard budget constraints. As market power rises, banks eventually find it too costly to discipline underperforming borrowers by stopping their projects. Lending relationships become

  13. Impact of a financial risk-sharing scheme on budget-impact estimations: a game-theoretic approach.

    Science.gov (United States)

    Gavious, Arieh; Greenberg, Dan; Hammerman, Ariel; Segev, Ella

    2014-06-01

    As part of the process of updating the National List of Health Services in Israel, health plans (the 'payers') and manufacturers each provide estimates on the expected number of patients that will utilize a new drug. Currently, payers face major financial consequences when actual utilization is higher than the allocated budget. We suggest a risk-sharing model between the two stakeholders; if the actual number of patients exceeds the manufacturer's prediction, the manufacturer will reimburse the payers by a rebate rate of α from the deficit. In case of under-utilization, payers will refund the government at a rate of γ from the surplus budget. Our study objective was to identify the optimal early estimations of both 'players' prior to and after implementation of the risk-sharing scheme. Using a game-theoretic approach, in which both players' statements are considered simultaneously, we examined the impact of risk-sharing within a given range of rebate proportions, on players' early budget estimations. When increasing manufacturer's rebate α to be over 50 %, then manufacturers will announce a larger number, and health plans will announce a lower number of patients than they would without risk sharing, thus substantially decreasing the gap between their estimates. Increasing γ changes players' estimates only slightly. In reaction to applying a substantial risk-sharing rebate α on the manufacturer, both players are expected to adjust their budget estimates toward an optimal equilibrium. Increasing α is a better vehicle for reaching the desired equilibrium rather than increasing γ, as the manufacturer's rebate α substantially influences both players, whereas γ has little effect on the players behavior.

  14. Innovative Concepts of Budgeting in the Enterprises

    Directory of Open Access Journals (Sweden)

    Adam Bąk

    2009-03-01

    Full Text Available The article presents the current concepts of budgeting with the special focus on innovative budgets. It includes the evolution of the budgeting concept starting from the traditional one which was applied in the second half of the 20th Century and assumed the budget as the main tool for the achievement of company’s goals. The next presented method is Better Budgeting. It arouse at the nineties as the resposne for the critics of the traditional method which was accused for the fixed assumptions which were no longer matching with the fast changing competitive environment. This method assumed the high level of budget preparation as he opposite to the detailed level as well as shorter planning period. The Beyond Budgeting was the most radical method and eliminated budget as the tool supporting the management; the concept has been used from the nineties until today, by more than seventy multinational companies from beyond budgeting round table. However, Beyond Budgeting was also criticised for not being applied in the industrial sector and too theoretical approach. Therefore, Ronald Gleicha from European Business School, established a working group, which icludes the scientists and managers, in order to create by mid of 2009, the new and opitimal method, which is called Modern Budgeting.

  15. Budget Elements of Economic Security: Specifics of Classification

    Directory of Open Access Journals (Sweden)

    О. S.

    2017-02-01

    Full Text Available Theoretical aspects of economic security in conjunction with budget components such as “budget interests” and “budget necessities” are analyzed. Key positions of the categories “budget interests” and “budget necessities” in the theory of economic security in the budgetary area are substantiated given their priority role in setting up its implementation strategy. The category “budget interests” is defined as the system of budget necessities of the interest holders, implemented through budget activities of entities and aimed at seeking benefits through the budget, in order to guarantee functioning and development of the society, the state, legal entities and physical persons. “Budget necessities” are defined as the need in budget funds to achieve and sustain, at a certain level, life activities of individuals, social groups, society, state and legal entities. Classification of budget interests by various criteria is made in the context of their impact on the economic security of the state. It is demonstrated that the four-tier classification of the budget interests by interest holder is essential to guaranteeing economic security in the budgetary area: budget interests of the state: the interests held by central and local power offices; budget interests of legal entities: the interests of profit and non-profit (public, budgetary, party and other organizations; budget interests of individuals: basic necessities of individuals, met by budget transfers, which stand out of the array of public necessities by their individual character.

  16. Tundra water budget and implications of precipitation underestimation.

    Science.gov (United States)

    Liljedahl, Anna K; Hinzman, Larry D; Kane, Douglas L; Oechel, Walter C; Tweedie, Craig E; Zona, Donatella

    2017-08-01

    Difficulties in obtaining accurate precipitation measurements have limited meaningful hydrologic assessment for over a century due to performance challenges of conventional snowfall and rainfall gauges in windy environments. Here, we compare snowfall observations and bias adjusted snowfall to end-of-winter snow accumulation measurements on the ground for 16 years (1999-2014) and assess the implication of precipitation underestimation on the water balance for a low-gradient tundra wetland near Utqiagvik (formerly Barrow), Alaska (2007-2009). In agreement with other studies, and not accounting for sublimation, conventional snowfall gauges captured 23-56% of end-of-winter snow accumulation. Once snowfall and rainfall are bias adjusted, long-term annual precipitation estimates more than double (from 123 to 274 mm), highlighting the risk of studies using conventional or unadjusted precipitation that dramatically under-represent water balance components. Applying conventional precipitation information to the water balance analysis produced consistent storage deficits (79 to 152 mm) that were all larger than the largest actual deficit (75 mm), which was observed in the unusually low rainfall summer of 2007. Year-to-year variability in adjusted rainfall (±33 mm) was larger than evapotranspiration (±13 mm). Measured interannual variability in partitioning of snow into runoff (29% in 2008 to 68% in 2009) in years with similar end-of-winter snow accumulation (180 and 164 mm, respectively) highlights the importance of the previous summer's rainfall (25 and 60 mm, respectively) on spring runoff production. Incorrect representation of precipitation can therefore have major implications for Arctic water budget descriptions that in turn can alter estimates of carbon and energy fluxes.

  17. Polity age and political budget cycles

    DEFF Research Database (Denmark)

    Aaskoven, Lasse

    2018-01-01

    Incumbent incentive for competence-signaling and lack of voter information are generally thought to be factors that increase the prevalence of political budget cycles. These mechanisms should be more prevalent in new political units. Since the creation of new political units is rarely exogenous......-experimental to study whether political budget cycles are larger in new political units. Contrary to theoretical predictions, political budget cycles seem to be of a smaller scale in the new municipalities, but only regarding budget cycles in budgetary overruns. The findings are of wider interest for discussions about...... the mechanisms behind context-conditional political budget cycles....

  18. Budgeting in Nonprofit Organizations.

    Science.gov (United States)

    Kelly, Lauren

    1985-01-01

    This description of the role of budgets in nonprofit organizations uses libraries as an example. Four types of budgets--legislative, management, cash, and capital--are critiqued in terms of cost effectiveness, implementation, and facilitation of organizational control and objectives. (CLB)

  19. 34 CFR 75.253 - Continuation of a multi-year project after the first budget period.

    Science.gov (United States)

    2010-07-01

    ... sufficient funds under the program; (2) The recipient has either— (i) Made substantial progress toward meeting the objectives in its approved application; or (ii) Obtained the Secretary's approval of changes... those objectives in succeeding budget periods; (3) The recipient has submitted all reports as required...

  20. Political Budget Cycles

    DEFF Research Database (Denmark)

    Aaskoven, Lasse; Lassen, David Dreyer

    2017-01-01

    The political budget cycle—how elections affect government fiscal policy—is one of the most studied subjects in political economy and political science. The key theoretical question is whether incumbent governments can time or structure public finances in ways that improve their chances of reelec......The political budget cycle—how elections affect government fiscal policy—is one of the most studied subjects in political economy and political science. The key theoretical question is whether incumbent governments can time or structure public finances in ways that improve their chances...... on political budget cycles have recently focused on conditions under which such cycles are likely to obtain. Much recent research focuses on subnational settings, allowing comparisons of governments in similar institutional environments, and a consensus on the presences of cycles in public finances...

  1. Fiscal Deficit and Its Impact on Economic Growth: Evidence from Bangladesh

    Directory of Open Access Journals (Sweden)

    Mohammed Ershad Hussain

    2017-10-01

    Full Text Available The findings from the VECM for BBS data reveal that there is a positive and significant relationship between FD and GDPGR, supporting the Keynesian theory, while findings from the VECM for World Bank data indicate that the impact of Fiscal Deficit (FD on GDPGR is mild but negative and significant at the 5% level. This contradicts the Keynesian theory, but is in accord with Neo-classical theory which asserts that fiscal deficits lead to a drop in the GDP. Nevertheless, the government must strive to keep deficit under control, not to hamper growth, and expenditure ought to be set so as to avoid massive deficits leading to debt financing and the crowding-out effect of private investment. If deficits become unsustainable, it can lead to higher interest payments, and the government may well default. Although in the economic literature, there is no definitive conclusion as to whether fiscal deficit helps or hinders economic growth for any country, many argue that fiscal deficit leads to economic growth of a country, which cannot be achieved only through domestic savings, not enough for investment. It can be assumed safely that to some extent fiscal deficit is good for economic growth if the borrowed money is spent on beneficial projects, provided the return from such investments exceeds the funding cost. For future research work, it will be interesting to examine the relationships between government spending, economic growth and long-term interest rate for Bangladesh.

  2. STATE BUDGET AND BUDGETARY PROCEDURES IN ROMANIA

    Directory of Open Access Journals (Sweden)

    POPA George Dorel

    2013-12-01

    Full Text Available In Romania, the budget process is governed by the Constitution and the Law of Public Finance no. 500/2002, act that includes the elaboration of the draft budget, approving the state budget, budget execution and budget control. All these activities are carried out in a legal way and administrative- institutional way, presenting features from country to country. The budget shows many traits in common: it is a decision process, because its essence consists in allocating budgetary resources for public goods such as education, health, national defence and so on. On the other hand is an essentially political process because allocation decisions budgetary resources are determined by the political groups, the mechanism of representation and voting, is a complex process with many participants (schools, hospitals, ministries, etc.. The budgetary process is a cyclic process, as it follows a well-defined calendar as a consequence of yearly and advertising budget. In conclusion, the budget process is a set of consecutive stages of development, approval, execution, control and reporting of the state budget, which ends with the approval of its execution account.

  3. Ripple Effects: Budgets Grow Modestly, but Energy Costs Cloud the Horizon

    Science.gov (United States)

    Oder, Norman

    2006-01-01

    In this article, the author reports the ripple effects of the energy squeeze due to Hurricane Katrina and other factors that sent energy costs skyrocketing. Energy costs are a good part of why budget growth, which has been steady over the past five years, has been slowing down. The projected change from FY2005 to FY2006 is only 3.3%, compared to…

  4. Operational waste volume projection

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  5. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  6. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  7. Defense.gov Special Report: 2013 Fiscal Budget

    Science.gov (United States)

    Department of Defense Submit Search 2013 Fiscal Budget Published Feb. 13, 2012 Top Stories Budget Proposal Slows Cost Growth, Pentagon Leaders Say The Defense Department's proposed fiscal 2013 budget request Department officials told a Senate panel. Story Officials Seek Construction Funds, More BRAC in Budget

  8. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  9. FEATURES OF PERFECT AND IMPERFECT RESERVES AND RESERVE FUNDS WITHIN THE FEDERAL BUDGET OF THE RUSSIAN FEDERATION

    Directory of Open Access Journals (Sweden)

    Tatyana P. Lomakina

    2018-03-01

    Full Text Available During the past two years (2016–2017, the mass media was engaged in tense discussion about the status and flow of funds within the two reserves – the Reserve Fund of the Russian Federation and the National Welfare Fund. The Reserve Fund of the Russian Federation aroused especial worries among the experts. Its funds rapidly declined and by December 2017 they were fully used to cover the deficit of the domestic budget. In accordance with the law “On Amendments to the Budget Code of the Russian Federation in the Use of Oil and Gas Revenues of the Federal Budget,” from February 1, 2018, the Reserve Fund of the Russian Federation will cease to exist. For financial theory, this fact can serve as an illustration of the process of forming the foundations of budgetary financial security, their change over time, circumstances and options the government can take to modify them. At the same time, there are other types of financial resources within the federal budget. Their diversity necessitates their classification in order to identify groups and types with similar characteristics. However, in financial theory, many types of reserves are not described in detail, and some are not described at all. This article introduces the concepts of “perfect” and “imperfect” reserves, for their characterization as part of the federal budget. The Russian Reserve Fund and the National Welfare Fund (Sovereign Funds are the examples of perfect financial reserves. Imperfect reserves comprise a large group of reserve funds that are included in the federal budget, for example, the Reserve Fund of the President of the Russian Federation and the Reserve Fund of the Government of the Russian Federation, the Reserve Fund of the Government of the Russian Federation for the prevention and control of emergencies and impact of natural disasters. The introduction of new typological features largely clarifies the situation with increased attention to one type of reserves

  10. Colorado Children's Budget 2013

    Science.gov (United States)

    Buck, Beverly; Baker, Robin

    2013-01-01

    The "Colorado Children's Budget" presents and analyzes investments and spending trends during the past five state fiscal years on services that benefit children. The "Children's Budget" focuses mainly on state investment and spending, with some analysis of federal investments and spending to provide broader context of state…

  11. An assessment of uncertainty in forest carbon budget projections

    Science.gov (United States)

    Linda S. Heath; James E. Smith

    2000-01-01

    Estimates of uncertainty are presented for projections of forest carbon inventory and average annual net carbon flux on private timberland in the US using the model FORCARB. Uncertainty in carbon inventory was approximately ±9% (2000 million metric tons) of the estimated median in the year 2000, rising to 11% (2800 million metric tons) in projection year 2040...

  12. [The department budget, in the context of the hospital global budget. Initial results in general medicine].

    Science.gov (United States)

    Besançon, F

    1984-02-23

    In a general hospital (Hôtel-Dieu, in the center of Paris), run with a global budget, budgets determined for each unit were introduced as an experiment in 1980. Physicians were in charge of certain expenses, mainly: linen, drugs, transportation of patients to and from other hospitals within Paris, and blood fractions. The whole does not exceed 4% of the turnover (FF 20 millions in 1980) of a 67 bed internal medicine unit. Other accounts deal with the stays, admissions, prescriptions of technical acts, laboratory analyses, and X-rays. In 1980, expenses were 11% more than budgeted, but the increase in stays and particularly in admissions was significantly greater. The resulting savings were 8.8% and 18.7% for stays and admissions respectively. Psychic reactions were variable. The subsequent budgets followed the fluctuations of recorded expenses, which were fairly important in both directions. The unit budget may be an advance or a regression, in a restrictive and past-perpetuating context. The coherence between the unit budget and the global hospital budget is questionable. Physicians were willing to take part in accounting and saving. They have good reason for not enlarging their financial responsibilities. Conversely, they may give more attention to diseases of public opinion.

  13. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  14. Dose budget for exposure control

    International Nuclear Information System (INIS)

    Nair, P.S.

    1999-01-01

    Dose budget is an important management tool to effectively control the collective dose incurred in a nuclear facility. The budget represents a set of yardsticks or guidelines for use in controlling the internal activities, involving radiation exposure in the organisation. The management, through budget can evaluate the radiation protection performance at every level of the organisation where a number of independent functional groups work on routine and non-routine jobs. The discrepancy between the plan and the actual performance is high lighted through the budgets. The organisation may have to change the course of its operation in a particular area or revise its plan with due focus on appropriate protective measures. (author)

  15. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  16. Laboratory administration--capital budgeting.

    Science.gov (United States)

    Butros, F

    1997-01-01

    The process of capital budgeting varies among different health-care institutions. Understanding the concept of present value of money, incremental cash flow statements, and the basic budgeting techniques will enable the laboratory manager to make the rational and logical decisions that are needed in today's competitive health-care environment.

  17. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  18. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  19. Fiscal Policy Trends: The Path to Balance or the Road to Ruin?

    Directory of Open Access Journals (Sweden)

    Bev Dahlby

    2018-03-01

    Full Text Available The NDP government’s plan to balance the provincial budget by 2023-24 is based on drastically cutting capital spending and on optimistic revenue projections. In order to show that these are the key elements of the “Path to Balance”, we need to know how interest payments on debt, total operating expenditures, and the cash deficits will evolve under the government’s plan, but these key fiscal variables are not reported in the budget documents.

  20. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    OpenAIRE

    Nataliya Melnichuk

    2015-01-01

    The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy...

  1. Defense.gov Special Report: 2015 Fiscal Budget

    Science.gov (United States)

    Department of Defense Submit Search FY 2015 Fiscal Budget News Stories Dempsey Calls for Budget Increase increase its budget, the chairman of the Joint Chiefs of Staff said. Story James: Air Force Grapples with Congress to Fund Readiness The Air Force fiscal 2015 budget request is shrinking because of Congressional

  2. 40 CFR 96.140 - State trading budgets.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 96.140 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Allowance Allocations § 96.140 State trading budgets. The State trading budgets for annual...

  3. Should Corrupt Countries receive Budget Support?

    OpenAIRE

    Kolstad, Ivar

    2005-01-01

    Corruption makes budget support ineffective, and sometimes counter-productive. Budget support is particularly unsuitable in partner countries where political corruption is rampant. As donors increase budget support, it is a paradox that corruption is not more of an issue in evaluations and public financial management assessment methods.

  4. Lean Mean Times--Budgeting for School Media Technology.

    Science.gov (United States)

    Johnson, Doug

    1995-01-01

    Discusses budgeting strategies for school media technology programs. Highlights include sources for school funding, school district budget information, control of the budget, how to write an effective budget, working with other community and school groups, local politics, and sidebars that discuss spreadsheets and maintenance budgets. (LRW)

  5. Colorado Children's Budget 2010

    Science.gov (United States)

    Colorado Children's Campaign, 2010

    2010-01-01

    The "Children's Budget 2010" is intended to be a resource guide for policymakers and advocates who are interested in better understanding how Colorado funds children's programs and services. It attempts to clarify often confusing budget information and describe where the state's investment trends are and where those trends will lead the…

  6. 40 CFR 97.140 - State trading budgets.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 97.140 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Allowance Allocations § 97.140 State trading budgets. The State trading budgets for annual allocations of CAIR NOX allowances...

  7. The Budget-Related Antecedents of Job Performance

    Directory of Open Access Journals (Sweden)

    Emine Yilmaz Karakoc

    2016-04-01

    Full Text Available This study aims to investigate budget related antecedents of job performance of managers. For this purpose, relationships among budgetary participation, budget goal commitment, information sharing, and job performance of managers were examined. The sample consists of managers who are responsible from the budgets of their units in different private enterprises located in Turkey. Survey data was analyzed with confirmatory factor analyses and Structural Equation Modeling. Results indicate that budgetary participation has statistically significant and positive impact on job performance. It also positively affects budget goal commitment and information sharing. Budget goal commitment and information sharing have significant and positive impact on job performance. In addition, budget goal commitment positively affects information sharing of managers. Analyses also revealed that budget goal commitment and information sharing have partial mediation effect on the relationship between budgetary participation and job performance.

  8. 25 CFR 41.12 - Annual budget.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Annual budget. 41.12 Section 41.12 Indians BUREAU OF... NAVAJO COMMUNITY COLLEGE Tribally Controlled Community Colleges § 41.12 Annual budget. Appropriations... identified in the Bureau of Indian Affairs Budget Justification. Funds appropriated for grants under this...

  9. Defense.gov Special Report: Fiscal Budget

    Science.gov (United States)

    Department of Defense Submit Search 2012 Fiscal Budget Published Feb. 15, 2011 Top Stories Commanders Cite Department is losing billions of dollars by Congress' failure to pass the department's fiscal 2011 budget . Gates told a Senate committee. Story Gates, Mullen Take Budget to Senate WASHINGTON, Feb. 17, 2011 - The

  10. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  11. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  12. A Capsule Look at Zero-Base Budgeting.

    Science.gov (United States)

    Griffin, William A., Jr.

    Weaknesses of the traditional incremental budgeting approach are considered as background to indicate the need for a new system of budgeting in educational institutions, and a step-by-step description of zero-based budgeting (ZBB) is presented. Proposed advantages of ZBB include the following: better staff morale due to a budget that is open and…

  13. 24 CFR 982.157 - Budget and expenditure.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Budget and expenditure. 982.157... and PHA Administration of Program § 982.157 Budget and expenditure. (a) Budget submission. Each PHA fiscal year, the PHA must submit its proposed budget for the program to HUD for approval at such time and...

  14. The Australian terrestrial carbon budget

    Directory of Open Access Journals (Sweden)

    V. Haverd

    2013-02-01

    Full Text Available This paper reports a study of the full carbon (C-CO2 budget of the Australian continent, focussing on 1990–2011 in the context of estimates over two centuries. The work is a contribution to the RECCAP (REgional Carbon Cycle Assessment and Processes project, as one of numerous regional studies. In constructing the budget, we estimate the following component carbon fluxes: net primary production (NPP; net ecosystem production (NEP; fire; land use change (LUC; riverine export; dust export; harvest (wood, crop and livestock and fossil fuel emissions (both territorial and non-territorial. Major biospheric fluxes were derived using BIOS2 (Haverd et al., 2012, a fine-spatial-resolution (0.05° offline modelling environment in which predictions of CABLE (Wang et al., 2011, a sophisticated land surface model with carbon cycle, are constrained by multiple observation types. The mean NEP reveals that climate variability and rising CO2 contributed 12 ± 24 (1σ error on mean and 68 ± 15 TgC yr−1, respectively. However these gains were partially offset by fire and LUC (along with other minor fluxes, which caused net losses of 26 ± 4 TgC yr−1 and 18 ± 7 TgC yr−1, respectively. The resultant net biome production (NBP is 36 ± 29 TgC yr−1, in which the largest contributions to uncertainty are NEP, fire and LUC. This NBP offset fossil fuel emissions (95 ± 6 TgC yr−1 by 38 ± 30%. The interannual variability (IAV in the Australian carbon budget exceeds Australia's total carbon emissions by fossil fuel combustion and is dominated by IAV in NEP. Territorial fossil fuel emissions are significantly smaller than the rapidly growing fossil fuel exports: in 2009–2010, Australia exported 2.5 times more carbon in fossil fuels than it emitted by burning fossil fuels.

  15. Collection assessment and acquisitions budgets

    CERN Document Server

    Lee, Sul H

    2013-01-01

    This invaluable new book contains timely information about the assessment of academic library collections and the relationship of collection assessment to acquisition budgets. The rising cost of information significantly influences academic libraries'abilities to acquire the necessary materials for students and faculty, and public libraries'abilities to acquire material for their clientele. Collection Assessment and Acquisitions Budgets examines different aspects of the relationship between the assessment of academic library collections and the management of library acquisition budgets. Librar

  16. Implementing Site-based Budgeting.

    Science.gov (United States)

    Sielke, Catherine C.

    2001-01-01

    Discusses five questions that must be answered before implementing site-based budgeting: Why are we doing this? What budgeting decisions will be devolved to the school site? How do dollars flow from the central office to the site? Who will be involved at the site? How will accountability be achieved? (Author/PKP)

  17. 42 CFR 441.472 - Budget methodology.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Budget methodology. 441.472 Section 441.472 Public... Self-Directed Personal Assistance Services Program § 441.472 Budget methodology. (a) The State shall set forth a budget methodology that ensures service authorization resides with the State and meets the...

  18. 40 CFR 35.9035 - Budget period.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Budget period. 35.9035 Section 35.9035... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9035 Budget period. An applicant may choose its budget period in consultation with and subject to the approval of the Regional Administrator. ...

  19. Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for Naval Training Center Great Lakes, Illinois

    Science.gov (United States)

    1994-05-19

    the audit of project P-608T, Building Modifications, as they relate to project P-557S. Because...project P-608T was addressed in Report No. 94-108, Quick-Reaction Report on the Audit of Defense Base Realignment and Closure Budget Data for Naval Station Treasure Island, California, May 19,

  20. PEPFAR Investments In Governance And Health Systems Were One-Fifth Of Countries' Budgeted Funds, 2004-14.

    Science.gov (United States)

    Moucheraud, Corrina; Sparkes, Susan; Nakamura, Yoriko; Gage, Anna; Atun, Rifat; Bossert, Thomas J

    2016-05-01

    Launched in 2003, the US President's Emergency Plan for AIDS Relief (PEPFAR) is the largest disease-focused assistance program in the world. We analyzed PEPFAR budgets for governance and systems for the period 2004-14 to ascertain whether PEPFAR's stated emphasis on strengthening health systems has been manifested financially. The main outcome variable in our analysis, the first of its kind using these data, was the share of PEPFAR's total annual budget for a country that was designated for governance and systems. The share of planned PEPFAR funding for governance and systems increased from 14.9 percent, on average, in 2004 to 27.5 percent in 2013, but it declined in 2014 to 20.8 percent. This study shows that the size of a country's PEPFAR budget was negatively associated with the share allocated for governance and systems (compared with other budget program areas); it also shows that there was no significant relationship between budgets for governance and systems and HIV prevalence. It is crucial for the global health policy community to better understand how such investments are allocated and used for health systems strengthening. Project HOPE—The People-to-People Health Foundation, Inc.

  1. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  2. Summary of the Budget and Economic Outlook: 2016 to 2026

    Science.gov (United States)

    2016-01-19

    projects. Debt held by the public would also grow significantly from its already high level . CBO anticipates that the economy will expand solidly this...when the econ - omy expands. Economic growth also will contribute to a rise of 3 percent in payroll taxes, CBO estimates. In contrast, corporate...rising debt would have serious negative consequences for the budget and the nation: B When interest rates increased from their current levels to more

  3. Budget-makers and health care systems.

    Science.gov (United States)

    White, Joseph

    2013-10-01

    Health programs are shaped by the decisions made in budget processes, so how budget-makers view health programs is an important part of making health policy. Budgeting in any country involves its own policy community, with key players including budgeting professionals and political authorities. This article reviews the typical pressures on and attitudes of these actors when they address health policy choices. The worldview of budget professionals includes attitudes that are congenial to particular policy perspectives, such as the desire to select packages of programs that maximize population health. The pressures on political authorities, however, are very different: most importantly, public demand for health care services is stronger than for virtually any other government activity. The norms and procedures of budgeting also tend to discourage adoption of some of the more enthusiastically promoted health policy reforms. Therefore talk about rationalizing systems is not matched by action; and action is better explained by the need to minimize blame. The budget-maker's perspective provides insight about key controversies in healthcare policy such as decentralization, competition, health service systems as opposed to health insurance systems, and dedicated vs. general revenue finance. It also explains the frequency of various "gaming" behaviors. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  4. 12 CFR 917.8 - Budget preparation.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Budget preparation. 917.8 Section 917.8 Banks... POWERS AND RESPONSIBILITIES OF BANK BOARDS OF DIRECTORS AND SENIOR MANAGEMENT § 917.8 Budget preparation. (a) Adoption of budgets. Each Bank's board of directors shall be responsible for the adoption of an...

  5. Budgetering och budgeteringsprocessen inom ekonomiförvaltningen

    OpenAIRE

    Finnström, Anders

    2013-01-01

    Syftet med undersökningen är att ge en bild av vad budgetering är och budgeteringsprocessen inom ekonomiförvaltningen. Forskningsproblemet är att ta reda på vilken kritiken är mot budgetering, hur man kan förbättra budgetarbetet och få fram vilka de alternativa metoderna är till budgetering. I lärdomsprovets teoretiska del behandlas vad en budget är, syften med en budget, huvud- och delbudgetar, budgeteringsprocessen, kritik och alternativa metoder till budgeteringen. I den empiriska delen ha...

  6. Budget perspective in Croatia after accession to the European Union

    Directory of Open Access Journals (Sweden)

    Petar Sopek

    2013-01-01

    Full Text Available Upon accession to the European Union, the New Member State’s budget undergoes significant structural changes due to the appearance of new categories of revenues and expenditures. The aim of this paper is to estimate the possible effects of Croatian membership in the EU on changes in the structure and size of budget revenues and expenditures upon the country’s accession to the EU in the second half of 2013, as well as to indicate the possibilities for utilization of EU funds in the new financial perspective up to 2020. It is shown that in 2013 Croatia might realize a positive net financial position in transactions with the EU budget in the amount of approximately 0.28% of GDP, i.e. EUR 136 m. The total net financial position of Croatia due to EU accession, which includes some additional costs and benefits like different harmonization and the need for project co-financing at state and local levels, is also positive in 2013 and amounts to approximately 0.15% of GDP or equivalently EUR 72 m. Total amount of all funds that Croatia might receive in the new EU financial perspective covering the period from 2014 to 2020 amounts to EUR 6.34 bn, whereby annual amounts increase from EUR 0.7 bn in 2014 up to EUR 1.2 bn in 2020. By using exponential regression analysis it is estimated that in 2020 Croatia should be a net recipient of funds from the EU budget in total amount of 1.72% of GDP, i.e. EUR 1.13 bn.

  7. Inter-organisational project management in context: managing differences

    NARCIS (Netherlands)

    Wognum, P.M.; Faber, Edward Christianus Cornelis; Thoben, K.D.; Weber, F; Pawar, K.S.

    2001-01-01

    Although in many organisations projects are run according to a standard procedure many projects run out of time and budget, don't achieve the required quality standards, or don't even finish at all. This is especially the case for large and complex projects with large differences between the parties

  8. Budget 2002: business taxation measures

    OpenAIRE

    Blow, L.; Hawkins, M.; Klemm, A.; McCrae, J.; Simpson, H.

    2002-01-01

    Following the 2002 Budget, this Briefing Note examines some of the Chancellor's changes to business taxation. A number of Budget measures, including the research and development tax credit for large companies and the exemption of capital gains on the sale of subsidiaries, are welcome and should improve the efficiency of the UK's tax system. All of these measures were subject to extensive prior consultation. A number of other measures were not foreshadowed in the Pre-Budget Report. Three of th...

  9. Fiscal Year 2010 Budget Request. Summary Justification

    Science.gov (United States)

    2009-05-01

    SERVICES AND DEFENSE AGENCIES INTRODUCTION Services and Defense Agencies HIGHLIGHTS Overview The FY 2010 budget request organizes, trains...DoD FY 2010 Budget Request Summary Justification SPECIAL TOPICS INTRODUCTION Special Topics HIGHLIGHTS Overview The FY 2010 budget... MANGEMENT 2-48 DoD FY 2010 Budget Request Summary Justification SPECIAL TOPICS FINANCIAL MANGEMENT 2-49 While DoD has made progress in

  10. Operating cost budgeting methods: quantitative methods to improve the process

    Directory of Open Access Journals (Sweden)

    José Olegário Rodrigues da Silva

    Full Text Available Abstract Operating cost forecasts are used in economic feasibility studies of projects and in budgeting process. Studies have pointed out that some companies are not satisfied with the budgeting process and chief executive officers want updates more frequently. In these cases, the main problem lies in the costs versus benefits. Companies seek simple and cheap forecasting methods without, at the same time, conceding in terms of quality of the resulting information. This study aims to compare operating cost forecasting models to identify the ones that are relatively easy to implement and turn out less deviation. For this purpose, we applied ARIMA (autoregressive integrated moving average and distributed dynamic lag models to data from a Brazilian petroleum company. The results suggest that the models have potential application, and that multivariate models fitted better and showed itself a better way to forecast costs than univariate models.

  11. 7 CFR 1744.63 - The telephone loan budget.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false The telephone loan budget. 1744.63 Section 1744.63... Disbursement of Funds § 1744.63 The telephone loan budget. When the loan is made, RUS provides the borrower a Telephone Loan Budget, RUS Form 493. This budget divides the loan into budget accounts such as “Engineering...

  12. Gas projects surge in the Middle East as governments seek new revenue sources

    International Nuclear Information System (INIS)

    Williams, M.D.

    1997-01-01

    The rapid development of natural gas and condensate reserves in the Middle East results from a simple motivation: the desire of governments to earn revenues. For the past decade, Middle East governments have run budget deficits, which they funded by drawing down foreign assets and issuing debt. Now in the process of structural economic reform, they have begun to use an under-utilized resource--natural gas, of which Middle East governments own about one third of the world's reserves. Governments receive revenues from several sources in natural gas developments, which makes the projects very attractive. Revenue comes from the sale of the natural gas in the domestic market and, if exported, the international market; the sale of associated condensates; the additional exports of crude oil or refined products if natural gas is substituted for refined products in domestic markets; the increased sale of crude oil if natural gas is injected into reservoirs to maintain pressure; and the sale of petrochemicals where natural gas is used as feedstock. Large projects under way in the Middle East highlight the consequences of multiple revenue sources and interlinked costs of natural gas and condensate development. Other countries in the region are undertaking similar projects, so examples cited represent only a portion of what is occurring. The paper describes Abu Dhabi, Qatar, Saudi Arabia, and Iran

  13. Nuclear Regulatory Commission Budget request for fiscal years 1986 and 1987. Oversight hearings before the Subcommittee on Energy and the Environment of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Ninth Congress, First and Second Session

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Two days of hearings on the fiscal year 1986-1987 budget request for the Nuclear Regulatory Commission (NRC) heard testimony from NRC Chairman Nunzio Palladino and four commissioners. Areas of concern were the NRC's failure to develop public confidence in nuclear power and the Commission's ability to regulate. Palladino noted that the total budget request of $429 million is $20 million less than the 1985 budget, which will limit the funding for research that would improve licensing procedures and safe plant operation. There was concern that efforts to reduce the federal deficit could lower the level of protection and affect the NRC's mission. Two appendices with correspondence and statements submitted for the record follow the testimony

  14. Vital signs: Budgets struggle to recover in teeth of Kyoto stream

    International Nuclear Information System (INIS)

    Lunan, D.

    2003-01-01

    Difficulties experienced by oil and gas companies in establishing their 2003 budgets due to the uncertainty surrounding the impact of Canada's ratification of the Kyoto Protocol are discussed. Only Shell Canada and Petro-Canada set their capital budgets by early December, an exercise that traditionally is wrapped up by early autumn. Nevertheless, for 2003 industry analysts anticipate a modest increase in industry capital expenditures to about $25 billion, up from $23.5 billion in 2002. Petro-Canada forecasts a substantial increase in its capital spending (to $2.6 billion) in its pursuit of growth at home and abroad, as is EnCana Corp., which anticipates spending a staggering $5 billion with 70 per cent earmarked for conventional onshore activities, the remainder for offshore and international initiatives. On the opposite end, Shell Canada set its capital and exploration budget at $810 million, about $1 billion less than in 2002, reflecting the completion of the Athabasca Oil Sands Project. Despite the dip in spending this year, Shell Canada nevertheless is maintaining an aggressive five-year plan that will see planned capital and exploration expenditures of some $3.4 billion, of which $1.2 billion is earmarked to move East Coast and Mackenzie Delta frontier opportunities forward. Overall, this year's modest increase in projected industry expenditures is seen as a welcome rebound from 2002, when the events of September 11, 2001, shook the political and economic foundations of the western world, causing total industry spending to fall from a record $27.7 billion in 2001. The most visible sign of industry's restraint in 2002 was at the land sale table, where sales were only half those generated in 2001

  15. Wake deficit measurements on the Jess and Souza Ranches, Altamont Pass

    Energy Technology Data Exchange (ETDEWEB)

    Nierenburg, R. (Altamont Energy Corp., San Rafael, CA (USA))

    1990-04-01

    This report is ninth in a series of documents presenting the findings of field test under DOE's Cooperative Field Test Program (CFTP) with the wind industry. This report provides results of a project conducted by Altamont Energy Corp. (AEC) to measure wake deficits on the Jess and Sousa Ranches in Altamont Pass, CA. This research enhances and complements other DOE-funded projects to refine estimates of wind turbine array effects. This project will help explain turbine performance variability caused by wake effects. 4 refs., 28 figs., 106 tabs.

  16. CEA budget in 1982

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    In 1982, the amount of the CEA budget will be 13.4 billions French Francs. The main characteristics are the priority for employment and investments. In this budget programs are adapted to fit R and D to the government policy: innovation, industrial valorization and fundamental research especially thermonuclear fusion and in the electronuclear field to safety, reprocessing and radioactive waste management.

  17. CAPITAL BUDGETING PRACTICES IN VIETNAM: A SURVEY OF CONSTRUCTION INVESTMENT FIRMS

    OpenAIRE

    Tran Tung, Linh

    2009-01-01

    The main intention of this research is to investigate how the Vietnamese firms evaluate the construction investment projects. The research is conducted by qualitative method by sending questionnaires to Vietnamese firms who specialize in construction investment field. Several questions are raised in the questionnaires which are categorized into four parts: evaluation techniques, risk analysis, discount rate and free cash flow forecasting. The distinction between Vietnamese capital budgeting w...

  18. Bugetul funcțional (Line - Item Budget) și metoda Buget Bază Zero ( Zero Base Budgeting - ZBB)

    OpenAIRE

    Dan Tudor LAZĂR; Adrian Mihai INCEU

    2004-01-01

    A line-item budget lists, in vertical columns, each of the revenue sources and each of the types – or classes – of items will purchase during the fiscal year. The line-item budget, which is the most widely used of all budgeting systems, offers many advantages. It is comparatively easy to prepare and doesn’t require sophisticated financial skills. Also, the line-item budget is straightforward, simple to administer and readily understood by everybody. Moreover, the simplicity of the system make...

  19. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  20. The Public Finance Stance and the Economic Growth: the Case of European Union

    OpenAIRE

    Ioan Talpos; Bogdan Dima; Mihai Ioan Mutascu; Cosmin Enache

    2007-01-01

    This paper is studying the impact of public budget deficit on the economic growth. We have tested the connection between budget deficit and economic growth, using econometrical analysis (the Pool Data Model). Within this framework, we have quantified the intensity of connections between public budget deficit and economic growth in the case of European Union 25.

  1. Participative Budgeting, Budget Evaluation, and Organizational Trust in Post-Secondary Educational Institutions in Canada

    Science.gov (United States)

    Simmons, Cynthia V.

    2012-01-01

    The purpose of this research was to investigate the relationship between a participative budgeting system, the attitudes toward the budget, and levels of organizational trust held by administrators in post-secondary institutions. A 50-item questionnaire was distributed to college and university administrators across Canada. A series of regression…

  2. Integrated Budget Office Toolbox

    Science.gov (United States)

    Rushing, Douglas A.; Blakeley, Chris; Chapman, Gerry; Robertson, Bill; Horton, Allison; Besser, Thomas; McCarthy, Debbie

    2010-01-01

    The Integrated Budget Office Toolbox (IBOT) combines budgeting, resource allocation, organizational funding, and reporting features in an automated, integrated tool that provides data from a single source for Johnson Space Center (JSC) personnel. Using a common interface, concurrent users can utilize the data without compromising its integrity. IBOT tracks planning changes and updates throughout the year using both phasing and POP-related (program-operating-plan-related) budget information for the current year, and up to six years out. Separating lump-sum funds received from HQ (Headquarters) into separate labor, travel, procurement, Center G&A (general & administrative), and servicepool categories, IBOT creates a script that significantly reduces manual input time. IBOT also manages the movement of travel and procurement funds down to the organizational level and, using its integrated funds management feature, helps better track funding at lower levels. Third-party software is used to create integrated reports in IBOT that can be generated for plans, actuals, funds received, and other combinations of data that are currently maintained in the centralized format. Based on Microsoft SQL, IBOT incorporates generic budget processes, is transportable, and is economical to deploy and support.

  3. USGS budget request up for 1994

    Science.gov (United States)

    White, M. Catherine

    The president's U.S. Geological Survey budget request for fiscal year 1994 totals $598 million—up $20 million from the current budget. This would restore about half of the $42.46 million cut from its budget in fiscal 1993.In releasing the budget, Bruce Babbitt, Secretary of the Department of the Interior, said, “The USGS reflects the new administration's understanding that investing in America requires investing in a strong Earth science capability,” and that “we need high-quality scientific information on natural hazards and on our water, mineral, energy, and land resources to serve as the building blocks for making intelligent decisions and planning future growth.”

  4. Experimental Plasma Research project summaries

    International Nuclear Information System (INIS)

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  5. Experimental Plasma Research project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report.

  6. NCTN Budget

    Science.gov (United States)

    Learn about the budget for the National Clinical Trials Network (NCTN), a National Cancer Institute program that gives funds and other support to cancer research organizations to conduct cancer clinical trials.

  7. STUDY CONCERNING THE EXECUTION OF LOCAL BUDGETS REVENUES

    Directory of Open Access Journals (Sweden)

    Cristinel ICHIM

    2013-12-01

    Full Text Available Implementation of local budget revenues is a very important sub-phase of the local budgetary process its correct accomplishment ensures regularity and efficiency in revenue collection, which will cover the local budget expenditures. Through this scientific approach we intended to achieve an analysis of the implementation of revenues mobilized to the local budgets in Romania. The study started with fixing the concept of execution of budget revenues and defining its phases, and followed with the analysis of the implementation of local budget revenues in three levels, namely: the overall local budgets in Romania, at the city level and at the community level. We have to mention that the analysis of the execution of local budgets was done in 2011, based on existing data in the last occurrence of the Romanian Statistical Yearbook for 2012. The paper concluded with some considerations regarding the execution of local budgets revenues and some proposals for improving the collection of local income.

  8. Radiation budget measurement/model interface

    Science.gov (United States)

    Vonderhaar, T. H.; Ciesielski, P.; Randel, D.; Stevens, D.

    1983-01-01

    This final report includes research results from the period February, 1981 through November, 1982. Two new results combine to form the final portion of this work. They are the work by Hanna (1982) and Stevens to successfully test and demonstrate a low-order spectral climate model and the work by Ciesielski et al. (1983) to combine and test the new radiation budget results from NIMBUS-7 with earlier satellite measurements. Together, the two related activities set the stage for future research on radiation budget measurement/model interfacing. Such combination of results will lead to new applications of satellite data to climate problems. The objectives of this research under the present contract are therefore satisfied. Additional research reported herein includes the compilation and documentation of the radiation budget data set a Colorado State University and the definition of climate-related experiments suggested after lengthy analysis of the satellite radiation budget experiments.

  9. 75 FR 21329 - Medicaid Program; State Allotments for Payment of Medicare Part B Premiums for Qualifying...

    Science.gov (United States)

    2010-04-23

    ... includes payment for premiums for Medicare Part B. Section 4732 of the Balanced Budget Act of 1997 (BBA... formula for determining State allotments. However, since certain States projected a deficit in their... minimize the impact on States with FY QI allotments that might be greater than their QI expenditures for...

  10. Filling the sustainability gap in the EU after the crisis

    NARCIS (Netherlands)

    Beetsma, R.; Gradus, R.; Chopin, T.; Foucher, M.

    2011-01-01

    Most countries in the European Union are facing a structural deterioration of their public budget as a result of the financial and economic crisis. The European Commission (2009) projects an average structural deficit for 2010 of 4.7% for the euro area and a corresponding figure of 5.5% for the

  11. Agricultural subsidies in the budget of the Republic of Serbia

    Directory of Open Access Journals (Sweden)

    Popović Vesna

    2015-01-01

    Full Text Available In this paper, the authors analyse the dynamics of agricultural subsidies, compared to the developments in public revenue and public expenditure and the total subsidies of the republic budget, in the years of 2006-2013. We performed desk research using official statistical data and processing them with standard statistical methods, and studying and quoting a number of scientific papers and documents of national and EU institutions. We also considered the government's projection of the scope and structure of agricultural subsidies by 2024, having in mind the fiscal consolidations and the obligations of adjusting legislation, support policy and institutional framework in agriculture with those of the EU. A three-year fiscal consolidation programme, which includes, among other things, reducing and re-examining agricultural support programmes, should create a healthy basis for stable and growing budget transfers to agriculture. Investment support will still be very important, and producers could expect a more significant growth in direct payments just before and just after joining the EU.

  12. Budget Impact Analysis of Biosimilar Trastuzumab for the Treatment of Breast Cancer in Croatia.

    Science.gov (United States)

    Cesarec, August; Likić, Robert

    2017-04-01

    Breast cancer is the most common cancer in women and has considerable impact on healthcare budgets and patients' quality of life. Trastuzumab (Herceptin ® ) is a monoclonal antibody directed against the human epidermal growth factor receptor (HER2) for the treatment of breast cancer. Several trastuzumab biosimilars are currently in development. In 2015, trastuzumab was the drug with the highest financial consumption among all drugs in Croatia. This model estimates the 1-year budget impact of the introduction of biosimilar trastuzumab in Croatia. A budget impact model, based on approvals for trastuzumab treatment in 2015, was developed for the introduction of biosimilars. Two biosimilar scenarios were developed: biosimilar scenario 1, based on all approvals in 2015, and biosimilar scenario 2, based on approvals after February 2015 and the reimbursement of the subcutaneous formulation of trastuzumab in Croatia. Only trastuzumab-naïve patients and drug-acquisition costs were used in the model. Uptake of biosimilar was assumed at 50 %. Scenarios were calculated with price discounts of 15, 25 and 35 %. The robustness of the model was tested by extensive sensitivity analyses. The projected drug cost savings from the introduction of biosimilar trastuzumab range from €0.26 million (scenario 2, 15 % price discount) to €0.69 million (scenario 1, 35 % price discount). If budget savings were reinvested to treat additional patients with trastuzumab, 14 (scenario 2, 15 % price discount) to 47 (scenario 1, 35 % price discount) additional patients could be treated. Sensitivity analyses showed that the incidence of breast cancer had the highest impact on the model, with a 10 % decrease in incidence leading to an 11.3 % decrease in projected savings. The introduction of biosimilar trastuzumab could lead to significant drug cost savings in Croatia.

  13. 14 CFR 152.323 - Budget revision: Airport development.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Budget revision: Airport development. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.323 Budget... change in the budget estimates, the sponsor shall submit a request for budget revision on a form...

  14. 24 CFR 791.405 - Reallocations of budget authority.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Reallocations of budget authority... Allocation of Budget Authority for Housing Assistance § 791.405 Reallocations of budget authority. (a) The field office shall make every reasonable effort to use the budget authority made available for each...

  15. Finance and supply management project execution plan; TOPICAL

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes

  16. Reactor safety and radiation protection. Draft of the BMU deparmental budget 16 of the 1998 German federal budget

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The expenditures earmarked for reactor safety and radiation protection in the 1998 budget of the German Federal Ministry for the Environment, Nature Conservation, and Reactor Safety (BMU) total DM 101 million. The expenditures of the German Federal Office for Radiation Protection (BfS) are to amount to a total of DM 579 million. These are the figures included in departmental budget 16 of the 1998 federal budget, which was discussed by the Federal Parliament in September 1997. The atw compilation singles out a number of significant items of the departmental budget. (orig.) [de

  17. NATURE AND CLASSIFICATION ASPECTS OF LOCAL BUDGET REVENUES

    Directory of Open Access Journals (Sweden)

    Oksana Vinnytska

    2015-11-01

    Full Text Available The purpose of the article is to determine the essential characteristics of local budgets and justify their classification aspects. Methodology. In the course of writing used general scientific and special methods of knowledge: dialectical and systemic-functional – to summarize the theoretical concepts of income of local budgets; analysis and synthesis – to detail the subject of research and study its components; logic synthesis – to justify approaches and proposals for the formulation of local budgets. Results. Proved that today there is no single view on the interpretation of economic categories “revenues of local budgets.” A refined concept of “local budget revenues” from the standpoint of material content, form, organizational structure and nature of local budgets. Local budget revenues determined as part of the financial resources of society, which is accumulated by local authorities to enforce their tasks and functions to implement current and future challenges of social infrastructure in the regions. Proved that the revenues of local budgets are derived from their own, and assigned to the established order of state taxes, fees and other mandatory payments. The main feature of their own revenues is the direct subordination of local government. The main feature is the fixed income long-term nature of their attachment to the appropriate budget. Value/originality. Proved that the presence in the economic literature of different classification criteria of local budget on various grounds provides multi classification that reflects all the features of the formation, use and functional differences revenues of local budgets. This approach provides the basis for improving the functioning of the theoretical foundations of the budget process in Ukraine at the level of local authorities.

  18. A Manhattan Project in Educational Technology, Part II.

    Science.gov (United States)

    Roberts, Wesley K.

    The initial four phases of the Training Extension Course (TEC), a project to remedy deficiencies in training programs for armed forces recruits, employed systematic instructional development and extensive audiovisual resources. The project required subcontracting for lesson production and modifications in personnel and budgeting. Posttest evidence…

  19. Project Management in Instructional Design: ADDIE Is Not Enough

    Science.gov (United States)

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  20. Proposed NOAA Budget Includes Hefty Increase for Satellites

    Science.gov (United States)

    Showstack, Randy

    2010-03-01

    The Obama administration's proposed fiscal year (FY) 2011 budget for the U.S. National Oceanic and Atmospheric Administration (NOAA) would provide the agency with $5.55 billion, which represents a total increase of $806.1 million, or 17% above the FY 2010 budget enacted by Congress. At a February briefing about the budget, NOAA administrator Jane Lubchenco said the budget is a very good package for the agency and that it reflects the administration's commitment to the environment, science, public safety, and job creation. Noting that the agency's budget remained essentially flat between FY 2005 and FY 2008 during the George W. Bush administration, Lubchenco said, “the increasing demand for NOAA's services, coupled with a static budget, created a major challenge for NOAA in delivering on expectations.” She said the funding picture for the agency improved with the FY 2009 and FY 2010 enacted budgets. Lubchenco noted that the proposed budget would include $949 million for research and development, an $82 million increase, adding, “Our 2011 request for each line office [within NOAA] is higher than it was in 2010, and we are better aligned with congressional funding levels than in previous budgets.”

  1. The nursing human resource budget: design for success.

    Science.gov (United States)

    Winkler, J B; Cameron, M L; Flarey, D L

    1995-06-01

    As vital as the nursing human resource budget is to the successful achievement of institutional goals, it is very important to present a well-developed budget. Using current automated spreadsheet technology, the nursing human resource budget can be laid out in a format that is easy to understand and easy to present. Using the methods discussed in this article, the nurse executive will be able to perform infinite iterations of the proposed budget with a few simple key strokes, thus allowing for things like zero-based budgeting or addition of programs during the budgeting process or at a later date. Implications for nurse executives are discussed.

  2. End user orientation of TC projects. Special evaluation review

    International Nuclear Information System (INIS)

    1996-12-01

    The present review of the end use orientation of TC projects was undertaken as requested by the TC Department to identify: (a) end users and beneficiaries beyond the boundaries of the counterpart laboratories, as appropriate; (b) means provided or planned to reach the end users and beneficiaries; (c) performance indicators in quantifiable terms, including those related to the counterpart activities that could be foreseen during and after completion of Agency assistance; and (d) recommendations of additional means, if necessary, to reach the end users and beneficiaries. A total of 13 TC projects with large budgets of around $200,000 and above were selected from those first approved under the 1995-1996 biennial programme and supported under the TCF, representing diverse fields of Agency activities and covering all the geographical areas of the Agency's technical co-operation. The projects thus selected were one each from Argentina, Bolivia, Bulgaria, Chile, Colombia, Egypt, Ethiopia, Jordan, Mexico, Mongolia, Slovenia, Turkey and Viet-Nam. The overall budget of the 13 projects as originally approved for 1995 to 1998, amounted to $5,510,980. The current budget as of 8 November 1996 stands at $5,446,719, representing a decrease of more than one percent. Figs, tabs

  3. Modelling of risk events with uncertain likelihoods and impacts in large infrastructure projects

    DEFF Research Database (Denmark)

    Schjær-Jacobsen, Hans

    2010-01-01

    to prevent future budget overruns. One of the central ideas is to introduce improved risk management processes and the present paper addresses this particular issue. A relevant cost function in terms of unit prices and quantities is developed and an event impact matrix with uncertain impacts from independent......This paper presents contributions to the mathematical core of risk and uncertainty management in compliance with the principles of New Budgeting laid out in 2008 by the Danish Ministry of Transport to be used in large infrastructure projects. Basically, the new principles are proposed in order...... uncertain risk events is used to calculate the total uncertain risk budget. Cost impacts from the individual risk events on the individual project activities are kept precisely track of in order to comply with the requirements of New Budgeting. Additionally, uncertain likelihoods for the occurrence of risk...

  4. 40 CFR 96.40 - State trading program budget.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading program budget. 96.40... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Allocations § 96.40 State trading program budget. The State trading program budget...

  5. 5 CFR 1320.17 - Information collection budget.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Information collection budget. 1320.17 Section 1320.17 Administrative Personnel OFFICE OF MANAGEMENT AND BUDGET OMB DIRECTIVES CONTROLLING PAPERWORK BURDENS ON THE PUBLIC § 1320.17 Information collection budget. Each agency's Senior Official, or...

  6. IMPACT OF EXTERNAL REIMBURSABLE FINANING ON VAT RECEIPTS IN THE STATE BUDGET OF THE REPUBLIC OF MOLDOVA

    Directory of Open Access Journals (Sweden)

    Marcel OLARI

    2017-04-01

    Full Text Available Under the current conditions, where rapid economic growth is an important prerequisite for improving the well-being of the population and reducing poverty, the state, being an important player on the economic arena of the Republic of Moldova, attracts external sources of reimbursable financing to support the budget and to carry out investment projects. Taking into account that these external sources increase the Central Government debt, generate the payment of certain interest, commissions, directly affect the expenditures of the state budget, I intended to investigate the impact of these reimbursable external sources on the one category of revenues of the state budget of the Republic of Moldova, (Value Added Tax receipts, in the light of the service and merchandise deliveries according to the transactions emerged from the contracted external reimbursable financing sources.

  7. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  8. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  9. Budget estimates fiscal year 1995: Volume 10

    International Nuclear Information System (INIS)

    1994-02-01

    This report contains the Nuclear Regulatory Commission (NRC) fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1995. The NRC 1995 budget request is $546,497,000. This is an increase of $11,497,000 above the proposed level for FY 1994. The NRC FY 1995 budget request is 3,218 FTEs. This is a decrease of 75 FTEs below the 1994 proposed level

  10. Budget estimates fiscal year 1995: Volume 10

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report contains the Nuclear Regulatory Commission (NRC) fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1995. The NRC 1995 budget request is $546,497,000. This is an increase of $11,497,000 above the proposed level for FY 1994. The NRC FY 1995 budget request is 3,218 FTEs. This is a decrease of 75 FTEs below the 1994 proposed level.

  11. 7 CFR 1219.53 - Budget and expenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budget and expenses. 1219.53 Section 1219.53..., AND INFORMATION Hass Avocado Promotion, Research, and Information Order Budgets, Expenses, and Assessments § 1219.53 Budget and expenses. (a) The Board is authorized to incur such expenses, including...

  12. Research on budget management under IT environment

    Directory of Open Access Journals (Sweden)

    Wenchang Li

    2017-03-01

    Full Text Available IT technology has become a key element of core competitiveness of enterprises, and also the basis for its daily operation. The budget is a management process of forecasting and planning of the future operation and financial activities under the guidance of the strategic objectives, and completion of the strategic objectives to a maximum extent. Whether both of them can be effectively combined with is the key to effective implementation of the budget. Through analysis of the existing problems of the traditional budget of the enterprise and the budget under the information technology environment, analysis of the internal and external influencing factors of the budget management of the large and medium sized enterprises under the current environment with SWOT, factor quantization and weight with AHP, development of the strategic program according to the priority of weight, and finally verification with a case, this paper concludes that, the budget management work can be more strategic and forward-looking through combination with AHP and SWOT analysis.

  13. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  14. Budget Update, November 9, 2010. Report 10-20

    Science.gov (United States)

    Woolfork, Kevin

    2010-01-01

    On October 8, Governor Arnold Schwarzenegger signed the 2010-11 Budget Act for the State of California. This budget was the outcome of many months of negotiation between the Governor and the Legislature. The Governor vetoed $963 million in spending from the Legislature's budget, arriving at a budget that addresses an estimated $19.1 billion…

  15. A socio-anthropological analysis of deficits of transition process in Serbia 2005-2006 and possibilities for elaborating alternative projects

    Directory of Open Access Journals (Sweden)

    Golubović Zagorka

    2006-01-01

    Full Text Available The paper is an outline of the author’s research project to be undertaken in 2006. It is focused on the process of transition from authoritarian to democratic order in Serbia after 2000. Starting from the findings of previous studies of transition, in Serbia and in other post socialist countries, the research will adopt a socio-anthropological approach and deal with the following topics: the model of transition being applied in Serbia preconditions for democratic transformation; a balance sheet of positive achievements accomplished and, on the other hand, "lost chances"; socio economic, political and cultural obstacles to articulating a coherent strategy of democratic development; psychological and anthropological aspects of current processes; alternative paths of democratic development feasible within given conditions. A central question the research will aim at resolving is why the current situation in Serbia is often described as suffering from a "democratic deficit".

  16. Budget of the U.S. Government, Fiscal Year 2013

    Science.gov (United States)

    Office of Management and Budget, Executive Office of the President, 2012

    2012-01-01

    "Budget of the United States Government, Fiscal Year 2013" contains the Budget Message of the President, information on the President's priorities, budget overviews organized by agency, and summary tables. The 2013 Budget contains a number of steps to put the country on a fiscally sustainable path. First, this Budget implements the tight…

  17. Prioritising transport infrastructure projects: Towards a multi-criterion ...

    African Journals Online (AJOL)

    Southern African Business Review ... systematic framework for the appraisal of transport infrastructure projects of the type 'budget cycle projects with local ... Cost/benefit analysis, when applied in a classic sense, is not suitable for this purpose, given its ... (optimal allocation of resources), equity (impact distribution aspects),

  18. Budget Options

    National Research Council Canada - National Science Library

    2001-01-01

    ... (including the off-budget Social Security trust funds) to $281 billion. That surplus would be the largest in history in nominal dollars and the largest since 1948 as a percentage of gross domestic product (GDP...

  19. 78 FR 3409 - Agency Information Collection Activities; Submission to the Office of Management and Budget for...

    Science.gov (United States)

    2013-01-16

    ...; Submission to the Office of Management and Budget for Review and Approval; Comment Request; Application for... Rehabilitation Act of 1973, as amended (Rehabilitation Act), to assist consumers and applicants in their relationships with projects, programs and services provided under the Rehabilitation Act including the...

  20. Carbon budget of Ontario's managed forests and harvested wood products, 2001–2100

    Science.gov (United States)

    Jiaxin Chen; Stephen J. Colombo; Michael T. Ter-Mikaelian; Linda S. Heath

    2010-01-01

    Forest and harvested wood products (HWP) carbon (C) stocks between 2001 and 2100 for Ontario's managed forests were projected using FORCARB-ON, an adaptation of the U.S. national forest C budget model known as FORCARB2. A fire disturbance module was introduced to FORCARB-ON to simulate the effects of wildfire on C, and some of the model's C pools were re-...

  1. Government programs for climate change mitigation in Japan. An analysis based on public budget documents and Government Project Review Sheets

    International Nuclear Information System (INIS)

    Kimura, Osamu

    2016-01-01

    The Japanese government has been spending huge public budgets for various programs to mitigate climate change, such as subsidy programs for energy efficient and renewable technologies, and R and D programs to develop innovative low carbon technologies. This report makes a comprehensive review of government projects and expenditure related to climate change mitigation in order to grasp their total expenditure and to analyze portfolio of supported technology and activity types, outcome, and the cost-effectiveness. It is estimated that the total expenditure for climate change mitigation excluding nuclear energy and forest sink projects amounts to 4.8 trillion JPY (approximately 40 billion USD) in the period of 2008 to 2014. 40% of the total expenditure went to only three largest programs, namely the Eco Car Subsidy, the Eco Point Programs for Appliances and Houses, all of which have gone through virtually no or only poor evaluations by the implementing ministries. While some programs had decent cost-effectiveness of reducing carbon dioxide emission at below 10,000 JPY/t-CO 2 (approximately 90 USD), there are also programs with very low cost-effectiveness at more than 100,000 JPY/t-CO 2 . Moreover, all of the evaluation was based on 'gross' reduction, not on 'net' of freeriders, rebound and other factors, which may lead to overestimation of performances. The result shows the need for a much larger resource for evaluation activities by the government. (author)

  2. Why budget accountability fails? The elusive links between parliaments and audit agencies in the oversight of the budget

    Directory of Open Access Journals (Sweden)

    CARLOS SANTISO

    2015-09-01

    Full Text Available ABSTRACTParliaments and audit agencies have critical and complementary roles in the oversight of the budget and the enforcement of government accountability. Yet, the nexus between parliaments and audit agencies is one of the weakest links in the accountability chain, generating an accountability gap in the budget process. This articles analyses the interactions between parliaments and audit agencies in the oversight of government finances during the latter stages of the budget process. Using proxies to evaluate the quality of those linkages, such as the follow-up to audit findings and the discharge of government, it shows important dysfunctions in the interactions between parliaments and audit agencies due to a combination of technical capacity constraints and political economy disincentives. It suggests that the effective functioning of the system of checks and balances in public budgeting critically hinges on the agility of the linkages between accountability institutions. As such, the failure of budget accountability is due to systemic dysfunctions in the systems of accountability, rather than the failure of an individual accountability institution acting in isolation. In addition, the effectiveness of the horizontal accountability architecture depends on the political economy incentives shaping the budget process, which are generated by the interactions between the choice of institutional design and budget rules, with the degree of political competition and electoral rules.

  3. Strategic plan creates a blueprint for budgeting.

    Science.gov (United States)

    Cook, D

    1990-05-01

    Effective healthcare organizations develop budgets that reflect and support a strategic plan. Senior managers set a framework that expresses the hospital's future strategic objectives. The budget enables executives to determine which specific service lines are profitable or unprofitable. Administrators and clinicians at all levels are involved in the budgeting process.

  4. 40 CFR 96.340 - State trading budgets.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 96.340 Section...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR NOX Ozone Season Allowance Allocations § 96.340 State trading budgets. (a) Except as provided in...

  5. 33 CFR 273.17 - Annual budget request.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Annual budget request. 273.17... DEFENSE AQUATIC PLANT CONTROL § 273.17 Annual budget request. The Aquatic Plant Control Program is a... to utilize within the budget year taking into account the foreseeable availability of local funds to...

  6. 7 CFR 1280.212 - Budget and expenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Budget and expenses. 1280.212 Section 1280.212... INFORMATION ORDER Lamb Promotion, Research, and Information Order Expenses § 1280.212 Budget and expenses. (a) The Board shall prepare and submit to the Secretary a budget for the fiscal year covering its...

  7. Solar Energy Deposition Rates in the Mesosphere Derived from Airglow Measurements: Implications for the Ozone Model Deficit Problem

    Science.gov (United States)

    Mlynczak, Martin G.; Garcia, Rolando R.; Roble, Raymond G.; Hagan, Maura

    2000-01-01

    We derive rates of energy deposition in the mesosphere due to the absorption of solar ultraviolet radiation by ozone. The rates are derived directly from measurements of the 1.27-microns oxygen dayglow emission, independent of knowledge of the ozone abundance, the ozone absorption cross sections, and the ultraviolet solar irradiance in the ozone Hartley band. Fifty-six months of airglow data taken between 1982 and 1986 by the near-infrared spectrometer on the Solar-Mesosphere Explorer satellite are analyzed. The energy deposition rates exhibit altitude-dependent annual and semi-annual variations. We also find a positive correlation between temperatures and energy deposition rates near 90 km at low latitudes. This correlation is largely due to the semiannual oscillation in temperature and ozone and is consistent with model calculations. There is also a suggestion of possible tidal enhancement of this correlation based on recent theoretical and observational analyses. The airglow-derived rates of energy deposition are then compared with those computed by multidimensional numerical models. The observed and modeled deposition rates typically agree to within 20%. This agreement in energy deposition rates implies the same agreement exists between measured and modeled ozone volume mixing ratios in the mesosphere. Only in the upper mesosphere at midlatitudes during winter do we derive energy deposition rates (and hence ozone mixing ratios) consistently and significantly larger than the model calculations. This result is contrary to previous studies that have shown a large model deficit in the ozone abundance throughout the mesosphere. The climatology of solar energy deposition and heating presented in this paper is available to the community at the Middle Atmosphere Energy Budget Project web site at http://heat-budget.gats-inc.com.

  8. Federal Funding Insulated State Budgets From Increased Spending Related To Medicaid Expansion.

    Science.gov (United States)

    Sommers, Benjamin D; Gruber, Jonathan

    2017-05-01

    As states weigh whether to expand Medicaid under the Affordable Care Act (ACA) and Medicaid reform remains a priority for some federal lawmakers, fiscal considerations loom large. As part of the ACA's expansion of eligibility for Medicaid, the federal government paid for 100 percent of the costs for newly eligible Medicaid enrollees for the period 2014-16. In 2017 states will pay some of the costs for new enrollees, with each participating state's share rising to 10 percent by 2020. States continue to pay their traditional Medicaid share (roughly 25-50 percent, depending on the state) for previously eligible enrollees. We used data for fiscal years 2010-15 from the National Association of State Budget Officers and a difference-in-differences framework to assess the effects of the expansion's first two fiscal years. We found that the expansion led to an 11.7 percent increase in overall spending on Medicaid, which was accompanied by a 12.2 percent increase in spending from federal funds. There were no significant increases in spending from state funds as a result of the expansion, nor any significant reductions in spending on education or other programs. States' advance budget projections were also reasonably accurate in the aggregate, with no significant differences between the projected levels of federal, state, and Medicaid spending and the actual expenses as measured at the end of the fiscal year. Project HOPE—The People-to-People Health Foundation, Inc.

  9. The SOLEIL project; Le projet soleil

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The SOLEIL project is built around an optimized 2,5 GeV positron storage ring with its own injector, i-e, a linear accelerator and a booster. This paper gathers information on the main characteristics of the project and more specially on the budget, the staff, the overall time table and a presentation of the Synchrotron Soleil Society. (A.L.B.)

  10. Budgeting for Efficiency and Effectiveness

    Science.gov (United States)

    Pereus, Steven C.

    2012-01-01

    For most districts, budgeting has become a cost-cutting exercise designed to close the gap between revenues and expenses. During this process, decision makers inherently assume that existing operations are efficient and effective--an assumption that is rarely validated by facts. Cutting programs and services balances budgets but does not…

  11. INSTITUTIONAL SUPPORT OF SECURITY BUDGET OF UKRAINE

    Directory of Open Access Journals (Sweden)

    S. Onishchenko

    2016-06-01

    Full Text Available The institutional framework from positions of different conceptual approaches was examined in the article. The attention was paid the problems of institutional support budget security in Ukraine. The institutionalization of budgetary relations and especially the formation system of institutional support was investigated. The author's approach to the nature of institutional support budget security was suggested. Institutional and legal, institutional and organizational, and staffing budget security were characterized. It is concluded that the process of institutional development budget security characterized by unacceptable levels of institutional strain.

  12. The AmP project: Comparing species on the basis of dynamic energy budget parameters.

    Directory of Open Access Journals (Sweden)

    Gonçalo M Marques

    2018-05-01

    Full Text Available We developed new methods for parameter estimation-in-context and, with the help of 125 authors, built the AmP (Add-my-Pet database of Dynamic Energy Budget (DEB models, parameters and referenced underlying data for animals, where each species constitutes one database entry. The combination of DEB parameters covers all aspects of energetics throughout the full organism's life cycle, from the start of embryo development to death by aging. The species-specific parameter values capture biodiversity and can now, for the first time, be compared between animals species. An important insight brought by the AmP project is the classification of animal energetics according to a family of related DEB models that is structured on the basis of the mode of metabolic acceleration, which links up with the development of larval stages. We discuss the evolution of metabolism in this context, among animals in general, and ray-finned fish, mollusks and crustaceans in particular. New DEBtool code for estimating DEB parameters from data has been written. AmPtool code for analyzing patterns in parameter values has also been created. A new web-interface supports multiple ways to visualize data, parameters, and implied properties from the entire collection as well as on an entry by entry basis. The DEB models proved to fit data well, the median relative error is only 0.07, for the 1035 animal species at 2018/03/12, including some extinct ones, from all large phyla and all chordate orders, spanning a range of body masses of 16 orders of magnitude. This study is a first step to include evolutionary aspects into parameter estimation, allowing to infer properties of species for which very little is known.

  13. Pure Nash Equilibria in Restricted Budget Games

    NARCIS (Netherlands)

    Drees, Maximilian Werner; Feldotto, Matthias; Riechers, Sören; Skopalik, Alexander

    2017-01-01

    In budget games, players compete over resources with finite budgets. For every resource, a player has a specific demand and as a strategy, he chooses a subset of resources. If the total demand on a resource does not exceed its budget, the utility of each player who chose that resource equals his

  14. The carbon budget of the North Sea

    NARCIS (Netherlands)

    Thomas, H.; Bozec, Y.; Baar, H.J.W. de; Elkalay, K.; Frankignoulle, M.; Schiettecatte, L.-S.; Kattner, G.; Borges, A.V.; Gattuso, J.-P.

    2005-01-01

    A carbon budget has been established for the North Sea, a shelf sea on the NW European continental shelf. The carbon exchange fluxes with the North Atlantic Ocean dominate the gross carbon budget. The net carbon budget – more relevant to the issue of the contribution of the coastal ocean to the

  15. 42 CFR 441.470 - Service budget elements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Service budget elements. 441.470 Section 441.470... Optional Self-Directed Personal Assistance Services Program § 441.470 Service budget elements. A service budget must be developed and approved by the State based on the assessment of need and service plan and...

  16. Budget estimates, fiscal years 1994--1995

    International Nuclear Information System (INIS)

    1993-04-01

    This report contains the fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal years 1994 and 1995

  17. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1978-08-01

    This report contans descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Measurements and Instrumentation; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  18. Operational waste volume projection. Revision 20

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1994-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of July 1994

  19. 40 CFR 97.340 - State trading budgets.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading budgets. 97.340 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR NOX Ozone Season Allowance Allocations § 97.340 State trading budgets. (a) Except as provided in paragraph (b) of this section, the State...

  20. Program Budgeting for a Graduate School Library.

    Science.gov (United States)

    Westerman, Mel

    Program budgeting, a method founded in the systems approach, allows control, management, and planning in the library system, and avoids the more comprehensive analysis required by zero-based budgeting. By evaluation of the impacts of the work accomplished by the library staff, the budgeted amounts can be justified or adjusted in subsequent years.…

  1. Industry adjusts 1992 E and P budgets

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that a midyear update of Salomon Bros. survey of the petroleum industry's 1992 exploration and production budgets pinpoints the ways operators are adjusting outlays to match the times. The New York financial firm's latest tally shows: Operators have made deep cuts in their 1992 US and Canadian E and P budgets since yearend 1991. Moderate increases budgeted earlier for E and P outside North America are intact. Many companies substantially underspent their budgets in first half 1992. In Salomon Bros. Largest survey---247 companies responded---operators the they were budgeting a 3.2% year to year decline in their 1992 worldwide E and P spending, compared with a 1.3% increase planned for 1992 in December 1991. The decline in spending falls entirely in North America. Preliminary indications suggest that 1993 E and P spending will be relatively flat in the US and flat to moderately increased in Canada. Elsewhere, spending should continue to rise steadily in 1993, Salomon Bros. The. Budgets exclude producing property purchases and merger or acquisition of other companies when possible

  2. ESCO Project for Buildings of Government Agencies in Thailand

    Directory of Open Access Journals (Sweden)

    Prukvilailert Monchai

    2016-01-01

    Full Text Available In Thailand, Department of Alternative Energy Development and Efficiency (DEDE have organized the ESCO project to promote and encourage the use of machinery, materials and equipment having high efficiency for government buildings. ESCO company provides the invest and management for changing equipments in the buildings. In this paper, the evaluation of the project has been presented. The potential of electricity savings is about 77 million kwhr/year. It can reduce imports of crude oil about 6.58 thousand tons of crude oil (Ktoe/year. The budget to invest is BHT 1,504 million, with an average payback period of 4.85. However, we found that the establishment of the budget is the barriers. The recommendations and solutions using legal process have been presented to proceed the project in the future.

  3. Automatic Deficits can lead to executive deficits in ADHD

    Directory of Open Access Journals (Sweden)

    Gabriella Martino

    2017-12-01

    Full Text Available It has been well documented an executive dysfunction in children with Attention Deficit Hyperactivity Disorder (ADHD and with Reading Disorder (RD. The purpose of the present study was to test an alternative hypothesis that deficits in executive functioning within ADHD may be partially due to an impairment of the automatic processing. In addition, since the co-occurrence between ADHD and RD, we tested the hypothesis that the automatic processing may be  a possible common cognitive factor between ADHD and RD. We investigated the automatic processing of selective visual attention through two experiments. 12 children with ADHD, 17 with ADHD+RD and 29 typically developing children, matched for age and gender, performed two tasks: Visual Information Processing Task and Clock Test. As expected, ADHD and ADHD+RD groups differed from the control group in controlled process task, suggesting a deficit in executive functioning. All clinical subjects also exhibited a lower performance in automatic processes, compared to control group. The results of this study suggest that executive deficits within ADHD can be partially due to an impairment of automatic processing.

  4. Capital Construction Fund Program :: Office of Management and Budget

    Science.gov (United States)

    Leaders Budget Policy Work for NOAA Fisheries Contact Us Programs Sustainable Fisheries Protected Regional Fishery Management Councils Congress Activities Budget Testimony Educators and Students Education Budget Home Appeals Division Budget FOIA Financial Services Saltonstall-Kennedy Grant Program Fisheries

  5. European Union Budget Politics

    DEFF Research Database (Denmark)

    Citi, Manuele

    2015-01-01

    The marginal involvement of the European Union (EU) in redistributive policies and its limited fiscal resources have led to a notable lack of attention by EU scholars towards the EU budget and its dynamics. Yet the nature of the budgetary data and their high usability for statistical analysis make...... to form winning coalitions in the Council, the ideological positioning of the co-legislators and the inclusion of the cohesion countries have played a significant role in driving budget change....

  6. FINANCIAL WORKBOOK Quick Reference -Budget Preparation 1 ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Alexandra Eustache

    FINANCIAL WORKBOOK. Quick Reference -Budget Preparation. 6. Enter detailed budget notes for each line item. Use the “add new row “ button if more rows are needed. (Refer to page 7 on user guider for more information on budget notes). 7. On the “indirect cost” sheet, enter a fixed percentage or amount(s) a. For fixed ...

  7. 40 CFR 97.40 - Trading program budget.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Trading program budget. 97.40 Section...) FEDERAL NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS NOX Allowance Allocations § 97.40 Trading program budget. In accordance with §§ 97.41 and 97.42, the Administrator will allocate to the NOX...

  8. Gewijzigd plan F-project werkplan voor jaar 4 en 5

    NARCIS (Netherlands)

    Quirijns, F.J.; Keeken, van O.A.; Densen, van W.L.T.; Pastoors, M.A.; Rijnsdorp, A.D.

    2005-01-01

    Oorspronkelijk zou het F-project lopen van 1 maart 2002 tot en met 1 maart 2006. Aangezien de budgetten na driekwart van het project nog niet tot 75% waren uitgeput, is in overweging genomen om het project met een jaar te verlengen, binnen het gestelde budget. Dit document is gebruikt als

  9. Lessons Learned from the 14-Year Systems Development of the Marine Corps Standard Accounting, Budgeting and Reporting System (SABRS)

    Science.gov (United States)

    1994-03-01

    22202-4302. and to the Office of Managmnt and Budget, Paperwork Reduction Project (0704-0188) Wahington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...Project Officer ........................ 49 d. Program Management ..................... 50 2. User/Systems Development Team Relationship ...... 52 D...and 60’s, when programming and systems development was in its infancy, virtually all software was custom -made. The programmer designed, coded

  10. Hawaii Regional Sediment Management (RSM): Regional Sediment Budget for the West Maui Region

    Science.gov (United States)

    2016-06-01

    ER D C/ CH L TR -1 6- 5 Regional Sediment Management (RSM) Program Hawaii Regional Sediment Management (RSM): Regional Sediment Budget...acwc.sdp.sirsi.net/client/default. Regional Sediment Management (RSM) Program ERDC/CHL TR-16-5 June 2016 Hawaii Regional Sediment Management...distribution is unlimited. Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 454632, “ Hawaii Regional Sediment Management

  11. Diffusion tensor MR imaging of white matter integrity in HIV-positive patients with planning deficit

    Energy Technology Data Exchange (ETDEWEB)

    Correa, Diogo Goulart; Doring, Thomas M.; Wilner, Nina Ventura; Cabral, Rafael Ferracini; Gasparetto, Emerson Leandro [Hospital Universitario Clementino Fraga Filho, Rio de Janeiro, RJ (Brazil); Clinica de Diagnostico por Imagem (CDPI), Rio de Janeiro, RJ (Brazil); Zimmermann, Nicolle; Fonseca, Rochele Paz [Hospital Universitario Clementino Fraga Filho, Rio de Janeiro, RJ (Brazil); Pontifical Catholic University of Rio Grande do Sul, Department of Psychology, Rio Grande do Sul (Brazil); Leite, Sarah C.B.; Bahia, Paulo R.V. [Hospital Universitario Clementino Fraga Filho, Rio de Janeiro, RJ (Brazil)

    2015-05-01

    The aim of this study was to evaluate whether normal controls and human immunodeficiency virus (HIV) patients with and without planning deficits differ on white matter integrity. A total of 34 HIV-positive patients with planning deficits were compared with 13 HIV-positive patients without planning deficits and 19 gender-, age-, and education-matched control subjects. Diffusion tensor imaging (DTI) was performed along 30 noncolinear directions in a 1.5-T scanner. For tract-based spatial statistics analysis, a white matter skeleton was created, and a permutation-based inference with 5000 permutations with a threshold of p < 0.05 was used to identify abnormalities in fractional anisotropy (FA). The median, radial, and axial diffusivities were also projected onto the mean FA skeleton. Compared with controls, HIV-positive patients with planning deficits had decreased FA in bilateral anterior thalamic radiations, bilateral inferior fronto-occiptal fasciculi, genu and splenium of the corpus callosum, bilateral superior longitudinal fascicule, and bilateral uncinate fasciculi. Compared to HIV-positive patients without planning deficits, patients with planning deficits had decreased FA in bilateral anterior thalamic radiations, bilateral inferior fronto-occiptal fasciculi, genu of the corpus callosum, bilateral superior longitudinal fascicule, and right uncinate fascicule. DTI can detect extensive white matter abnormalities in the normal-appearing white matter of HIV-positive patients with planning deficits compared with controls and HIV-positive patients without planning deficits. (orig.)

  12. Diffusion tensor MR imaging of white matter integrity in HIV-positive patients with planning deficit

    International Nuclear Information System (INIS)

    Correa, Diogo Goulart; Doring, Thomas M.; Wilner, Nina Ventura; Cabral, Rafael Ferracini; Gasparetto, Emerson Leandro; Zimmermann, Nicolle; Fonseca, Rochele Paz; Leite, Sarah C.B.; Bahia, Paulo R.V.

    2015-01-01

    The aim of this study was to evaluate whether normal controls and human immunodeficiency virus (HIV) patients with and without planning deficits differ on white matter integrity. A total of 34 HIV-positive patients with planning deficits were compared with 13 HIV-positive patients without planning deficits and 19 gender-, age-, and education-matched control subjects. Diffusion tensor imaging (DTI) was performed along 30 noncolinear directions in a 1.5-T scanner. For tract-based spatial statistics analysis, a white matter skeleton was created, and a permutation-based inference with 5000 permutations with a threshold of p < 0.05 was used to identify abnormalities in fractional anisotropy (FA). The median, radial, and axial diffusivities were also projected onto the mean FA skeleton. Compared with controls, HIV-positive patients with planning deficits had decreased FA in bilateral anterior thalamic radiations, bilateral inferior fronto-occiptal fasciculi, genu and splenium of the corpus callosum, bilateral superior longitudinal fascicule, and bilateral uncinate fasciculi. Compared to HIV-positive patients without planning deficits, patients with planning deficits had decreased FA in bilateral anterior thalamic radiations, bilateral inferior fronto-occiptal fasciculi, genu of the corpus callosum, bilateral superior longitudinal fascicule, and right uncinate fascicule. DTI can detect extensive white matter abnormalities in the normal-appearing white matter of HIV-positive patients with planning deficits compared with controls and HIV-positive patients without planning deficits. (orig.)

  13. Budget Cuts: Financial Aid Offices Face Budget Cuts and Increasing Workload. Quick Scan Survey Results

    Science.gov (United States)

    National Association of Student Financial Aid Administrators (NJ1), 2010

    2010-01-01

    The majority of college financial aid offices have seen cuts to their operating budgets this year compared to the 2007-08 academic year when the recession began, according to the National Association of Student Financial Aid Administrator's latest QuickScan Survey. Sixty-two percent of financial aid offices reported operating budget cuts this year…

  14. Fusion looks to the future - again

    International Nuclear Information System (INIS)

    Waldrop, M.M.

    1984-01-01

    The $46 million budget cut in the US magnetic fusion program introduced a new approach that abandons the race to build a working power reactor in favor of a long-term emphasis on science, technology, and international cooperation. Administration policies which favor private funding for demonstration projects and general concern over the deficit have changed the overall fusion policy, although there is some concern among research groups that the program will become unfocused without its detailed timetable. If this happens, they see the program becoming even more vulnerable to future budget cuts. 2 references

  15. Investment, credit rationing, and the soft budget constraint: what would a well-functioning credit market look like?

    Czech Academy of Sciences Publication Activity Database

    Hanousek, Jan; Filer, R. K.

    2004-01-01

    Roč. 82, č. 3 (2004), s. 385-390 ISSN 0165-1765 R&D Projects: GA MŠk ME 595 Institutional research plan: CEZ:AV0Z7085904 Keywords : credit rationing * soft budget constraint * investment Subject RIV: AH - Economics Impact factor: 0.361, year: 2004

  16. Quantitative Correlational Study: Emotional Intelligence and Project Outcomes among Hispanics in Technology

    Science.gov (United States)

    Trejo, Arturo

    2013-01-01

    The present quantitative correlational research study explored relationships between Emotional Intelligence (EI) competencies, such as self-awareness, self-management, social awareness, and relationship management, and project management outcomes: scope creep, in-budget project cost, and project timeliness. The study was conducted within the…

  17. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  18. The advantage of using operational budgeting on governmental organization

    Directory of Open Access Journals (Sweden)

    Manouchehr Najafi

    2012-01-01

    Full Text Available Budgeting plays an important role on increasing efficiency of organizations. It helps determine targets and possible future chaos a head of time. A good budgeting plan can create motivation among workers and managers. There are different budgeting plans such as traditional and operational. In this paper, we analyze the effects of executing budgeting plan on governmental organizations. The proposed study of this paper designs a questionnaire consists of various questions and selects 94 people out of 125 financial managers who work for various governmental organizations in province of Zanjan, Iran. The results indicate that the operational budgeting could help provide better performance measurement of governmental organizations, it helps us provide a more precise cost of products and services, and it helps government allocate the necessary budget proportion to performance measurement. The results of our survey also indicate that operational budgeting redirect costs towards our objectives and make the overall budgeting crystal clear.

  19. Decentralized Budgeting: Getting the Most Out of Disbursements of Funds.

    Science.gov (United States)

    Jefferson, Anne L.

    1995-01-01

    Decentralizing educational budgets allows the disbursement of funds aimed at maximizing student development. Three strategies for decentralizing budgets are program budgeting, which eliminates line-item budgeting and allows administrators to address questions regarding the relative value of educational programs; zero-based budgeting, which allows…

  20. The USDA's Healthy Eating on a Budget Program: Making Better Eating Decisions on a Budget

    Science.gov (United States)

    Franklin, Alexandra M.; Hongu, Nobuko

    2016-01-01

    The U.S. Department of Agriculture has launched a new interactive online program titled Healthy Eating on a Budget. It is an addition to the popular ChooseMyPlate.gov programs, such as the SuperTracker program. The Healthy Eating on a Budget program helps consumers plan, purchase, and prepare healthful meals. This article discusses materials and…

  1. Greater future global warming inferred from Earth's recent energy budget.

    Science.gov (United States)

    Brown, Patrick T; Caldeira, Ken

    2017-12-06

    Climate models provide the principal means of projecting global warming over the remainder of the twenty-first century but modelled estimates of warming vary by a factor of approximately two even under the same radiative forcing scenarios. Across-model relationships between currently observable attributes of the climate system and the simulated magnitude of future warming have the potential to inform projections. Here we show that robust across-model relationships exist between the global spatial patterns of several fundamental attributes of Earth's top-of-atmosphere energy budget and the magnitude of projected global warming. When we constrain the model projections with observations, we obtain greater means and narrower ranges of future global warming across the major radiative forcing scenarios, in general. In particular, we find that the observationally informed warming projection for the end of the twenty-first century for the steepest radiative forcing scenario is about 15 per cent warmer (+0.5 degrees Celsius) with a reduction of about a third in the two-standard-deviation spread (-1.2 degrees Celsius) relative to the raw model projections reported by the Intergovernmental Panel on Climate Change. Our results suggest that achieving any given global temperature stabilization target will require steeper greenhouse gas emissions reductions than previously calculated.

  2. Joint development effort Thermonuclear Fusion. Programme budgeting 1984

    International Nuclear Information System (INIS)

    1985-01-01

    The joint KfK and IPP project for the development of thermonuclear fusion device is established as the centerpiece of Federal German efforts in this field. It is meant to enhance the German contribution to the European programme and thus foster the chances of a joint European large-scale experiment to be started in the Federal Republic of Germany. IPP's tasks in the project are to study the physical principles and aspects, whereas KfK is responsible for the technological aspects. Work at IPP is focused on divertor experiments with the ASDEX series in order to go deeper into the problems that could not be solved by the JET experiments, namely those of the plasma boundary and control of impurities. Stellarator experiments are made in order to study the potentials of this toroidal confinement concept for steady-state operation. The IPP which always has been working in the plasma physics field devotes all activities to the joint effort. KfK has established a special project group for this purpose, PKF. The budgeting programme presented therefore covers the IPP entire working schedule, and that of PKF of the KfK. (orig./GG) [de

  3. Evaluation of Building Projects Using Earned Value Technique ...

    African Journals Online (AJOL)

    This study evaluates building construction projects using the Earned Value Analysis technique, the Experimental Approach, and Value Concept Analysis. The aim was to compare the cost incurred for an identified amount of work done on a project with the cost budgeted for the same work. The results were used to calculate ...

  4. Budget of the U.S. Government, Fiscal Year 2017

    Science.gov (United States)

    Office of Management and Budget, Executive Office of the President, 2016

    2016-01-01

    "Budget of the United States Government, Fiscal Year 2017" contains the Budget Message of the President, information on the President's priorities, and summary tables. President Obama's 2017 Budget makes critical investments while adhering to the bipartisan budget agreement he signed into the previous fall, and it lifts sequestration in…

  5. The CEA budget in 1982

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    In 1982, the amount of the CEA budget will be 13.4 billions French Francs. The main characteristics are the priority for employment and investments. In this budget programs are adapted to fit R and D to the government policy: innovation, industrial valorization and fundamental research especially thermonuclear fusion and in the electronuclear field to safety, reprocessing and radioactive waste management [fr

  6. Cost reduction by using budgeting via the Kaizen method

    OpenAIRE

    Dorina Budugan; Iuliana Georgescu

    2009-01-01

    In the current conditions, continuous improvement is one of the main issues faced by the manag-ers of organizations. The Japanese use the term kaizen to designate continuous improvement. Budgeting via the kaizen method explicitly integrates improvement throughout the period budgeted in the budget data. Budget explanation via the kaizen method refers, on the one hand, to budgeting for the purposes of continuously improving the number of work hours per product unit, and, on the other hand, to t...

  7. Budget impact analysis of chronic kidney disease mass screening test in Japan.

    Science.gov (United States)

    Kondo, Masahide; Yamagata, Kunihiro; Hoshi, Shu-Ling; Saito, Chie; Asahi, Koichi; Moriyama, Toshiki; Tsuruya, Kazuhiko; Konta, Tsuneo; Fujimoto, Shouichi; Narita, Ichiei; Kimura, Kenjiro; Iseki, Kunitoshi; Watanabe, Tsuyoshi

    2014-12-01

    Our recently published cost-effectiveness study on chronic kidney disease mass screening test in Japan evaluated the use of dipstick test, serum creatinine (Cr) assay or both in specific health checkup (SHC). Mandating the use of serum Cr assay additionally, or the continuation of current policy mandating dipstick test only was found cost-effective. This study aims to examine the affordability of previously suggested reforms. Budget impact analysis was conducted assuming the economic model would be good for 15 years and applying a population projection. Costs expended by social insurers without discounting were counted as budgets. Annual budget impacts of mass screening compared with do-nothing scenario were calculated as ¥79-¥-1,067 million for dipstick test only, ¥2,505-¥9,235 million for serum Cr assay only and ¥2,517-¥9,251 million for the use of both during a 15-year period. Annual budget impacts associated with the reforms were calculated as ¥975-¥4,129 million for mandating serum Cr assay in addition to the currently used mandatory dipstick test, and ¥963-¥4,113 million for mandating serum Cr assay only and abandoning dipstick test. Estimated values associated with the reform from ¥963-¥4,129 million per year over 15 years are considerable amounts of money under limited resources. The most impressive finding of this study is the decreasing additional expenditures in dipstick test only scenario. This suggests that current policy which mandates dipstick test only would contain medical care expenditure.

  8. The Relevance of Budget Preparation in School Administration | Fan ...

    African Journals Online (AJOL)

    It demands a periodic preparation of the school budget. This paper therefore examines the concept of budgeting, its advantages in our school system and suggests some accounting requirements which are aimed at making the preparation of a budget less cumbersome and more realistic. It highlights four types of budgets: ...

  9. Project Evaluation under Inflation Condition

    International Nuclear Information System (INIS)

    Hindy, M.; El Missiry, P.

    2004-01-01

    This paper analyzes the role of inflation in capital budgeting and attempts to introduce solutions to such implication in order to make the appropriate decision for the firm' stockholders under these circumstances. Inflation leads to biasness in evaluating the investment projects, due to its impact on the cash flow, the discount rate, the initial investment cost, and the depreciation. This paper has shown that the capital budgeting process is not neutral with respect to inflation, as the output prices will raise as well as the operating and capital expenditures will also be adjusted due to inflation. In addition, it has shown that it is reasonable to expect that the cost of capital will increase as a result of an increase in the real interest rate, the inflation premium, and the cost of equity. Of critical importance is the basis used in calculating the annual depreciation which may lead to the transfer of wealth from the investment projects to the government and will result in underestimating the net present value of the investment projects, if these depreciation charges is calculated based upon the historical values and not on the replacement cost of the fixed assets

  10. Increasing Northern Hemisphere water deficit

    Science.gov (United States)

    McCabe, Gregory J.; Wolock, David M.

    2015-01-01

    A monthly water-balance model is used with CRUTS3.1 gridded monthly precipitation and potential evapotranspiration (PET) data to examine changes in global water deficit (PET minus actual evapotranspiration) for the Northern Hemisphere (NH) for the years 1905 through 2009. Results show that NH deficit increased dramatically near the year 2000 during both the cool (October through March) and warm (April through September) seasons. The increase in water deficit near 2000 coincides with a substantial increase in NH temperature and PET. The most pronounced increases in deficit occurred for the latitudinal band from 0 to 40°N. These results indicate that global warming has increased the water deficit in the NH and that the increase since 2000 is unprecedented for the 1905 through 2009 period. Additionally, coincident with the increase in deficit near 2000, mean NH runoff also increased due to increases in P. We explain the apparent contradiction of concurrent increases in deficit and increases in runoff.

  11. The performance indicators of model projects. A special evaluation

    International Nuclear Information System (INIS)

    1995-11-01

    As a result of the acknowledgment of the key role of the Model Project concept in the Agency's Technical Co-operation Programme, the present review of the objectives of the model projects which are now in operation, was undertaken, as recommended by the Board of Governors, to determine at an early stage: the extent to which the present objectives have been defined in a measurable way; whether objectively verifiable performance indicators and success criteria had been identified for each project; whether mechanisms to obtain feedback on the achievements had been foreseen. The overall budget for the 23 model projects, as approved from 1994 to 1998, amounts to $32,557,560, of which 45% is funded by Technical Co-operation Fund. This represents an average investment of about $8 million per year, that is over 15% of the annual TC budget. The conceptual importance of the Model Project initiative, as well as the significant funds allocated to them, led the Secretariat to plan the methods to be used to determine their socio-economic impact. 1 tab

  12. Ozone and carbon monoxide budgets over the Eastern Mediterranean.

    Science.gov (United States)

    Myriokefalitakis, S; Daskalakis, N; Fanourgakis, G S; Voulgarakis, A; Krol, M C; Aan de Brugh, J M J; Kanakidou, M

    2016-09-01

    The importance of the long-range transport (LRT) on O3 and CO budgets over the Eastern Mediterranean has been investigated using the state-of-the-art 3-dimensional global chemistry-transport model TM4-ECPL. A 3-D budget analysis has been performed separating the Eastern from the Western basins and the boundary layer (BL) from the free troposphere (FT). The FT of the Eastern Mediterranean is shown to be a strong receptor of polluted air masses from the Western Mediterranean, and the most important source of polluted air masses for the Eastern Mediterranean BL, with about 40% of O3 and of CO in the BL to be transported from the FT aloft. Regional anthropogenic sources are found to have relatively small impact on regional air quality in the area, contributing by about 8% and 18% to surface levels of O3 and CO, respectively. Projections using anthropogenic emissions for the year 2050 but neglecting climate change calculate a surface O3 decrease of about 11% together with a surface CO increase of roughly 10% in the Eastern Mediterranean. Copyright © 2016 Elsevier B.V. All rights reserved.

  13. The interaction between motivational disposition and participative budgeting

    DEFF Research Database (Denmark)

    Sandalgaard, Niels; Bukh, Per Nikolaj; Poulsen, Carsten Stig

    2011-01-01

    The purpose of the paper is to report the findings of a study of how dispositional factors of motivation rooted in personality interact with participative budgeting to affect budget goal commitment. The results indicate that the effect of increased budgetary participation on budget goal commitment...

  14. Developing an Earth system Inverse model for the Earth's energy and water budgets.

    Science.gov (United States)

    Haines, K.; Thomas, C.; Liu, C.; Allan, R. P.; Carneiro, D. M.

    2017-12-01

    The CONCEPT-Heat project aims at developing a consistent energy budget for the Earth system in order to better understand and quantify global change. We advocate a variational "Earth system inverse" solution as the best methodology to bring the necessary expertise from different disciplines together. L'Ecuyer et al (2015) and Rodell et al (2015) first used a variational approach to adjust multiple satellite data products for air-sea-land vertical fluxes of heat and freshwater, achieving closed budgets on a regional and global scale. However their treatment of horizontal energy and water redistribution and its uncertainties was limited. Following the recent work of Liu et al (2015, 2017) which used atmospheric reanalysis convergences to derive a new total surface heat flux product from top of atmosphere fluxes, we have revisited the variational budget approach introducing a more extensive analysis of the role of horizontal transports of heat and freshwater, using multiple atmospheric and ocean reanalysis products. We find considerable improvements in fluxes in regions such as the North Atlantic and Arctic, for example requiring higher atmospheric heat and water convergences over the Arctic than given by ERA-Interim, thereby allowing lower and more realistic oceanic transports. We explore using the variational uncertainty analysis to produce lower resolution corrections to higher resolution flux products and test these against in situ flux data. We also explore the covariance errors implied between component fluxes that are imposed by the regional budget constraints. Finally we propose this as a valuable methodology for developing consistent observational constraints on the energy and water budgets in climate models. We take a first look at the same regional budget quantities in CMIP5 models and consider the implications of the differences for the processes and biases active in the models. Many further avenues of investigation are possible focused on better valuing

  15. 25 CFR 1000.105 - What are self-governance base budgets?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What are self-governance base budgets? 1000.105 Section... Base Budgets § 1000.105 What are self-governance base budgets? (a) A Tribe/Consortium self-governance base budget is the amount of recurring funding identified in the President's annual budget request to...

  16. Does National Culture Impact Capital Budgeting Systems?

    OpenAIRE

    Peter J. Graham; Milind Sathye

    2017-01-01

    We examine how national culture impacts organisational selection of capital budgeting systems to develop our understanding of what influence a holistic formulation of national culture has on capital budgeting systems. Such an understanding is important as it would not only provide a clearer link between national culture and capital budgeting systems and advance extant literature but would also help multinational firms that have business relationships with Indonesian firms in suita...

  17. A Well-Designed Budget Yields Long-Term Rewards.

    Science.gov (United States)

    Pinola, Mary; Knirk, Frederick G.

    1984-01-01

    Defines zero-based budgeting, compares it to traditional budgeting, and discusses five steps of a zero-base budget model: determining organization's goals and refining them into objectives; listing activities to achieve objectives in decision packages; evaluating decision packages; ranking packages by order of importance; and funding decision…

  18. 40 CFR 52.2424 - Motor vehicle emissions budgets.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Motor vehicle emissions budgets. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2424 Motor vehicle emissions budgets. (a) Motor vehicle emissions budget for the Hampton Roads maintenance area adjusting the...

  19. 10 CFR 434.602 - Determination of the annual energy budget.

    Science.gov (United States)

    2010-01-01

    ... following exceptions: The Energy Use Budget shall be stated in units of Btu/ft2/yr and the simulation tool... case by case calculation of the Energy Use Budget, the designer may construct Energy Use Budget tables... corresponding Energy Use Budgets calculated on a case by case basis according to this section. Energy Use Budget...

  20. Political Broker and Budget Mafia in Indonesian Parliament

    Directory of Open Access Journals (Sweden)

    Moh. Ilham A. Hamudy

    2014-09-01

    Full Text Available Budget mafia practices and brokerage phenomenon in ministries/agencies and the parliament in the country's financial dredge is very alarming. Not counted how much money is successfully robbed. The modus is varying, so it is not easy to dismantle. Because expert move, the law enforcers had trouble catching them. This article tried to describe the mode of action and often they do. The method is done by tracing the various reports in newspapers. From tracking and in-depth analysis, it could be concluded that in order to minimize the action of brokers and budget mafia practices there are some necessary steps. First, fixing the finances system of political parties, reducing the dominance of parliament in budget management and election of public officials, and encourage law enforcement. Second, transparency debates the state budget in the parliament to be a key budget reforms. Third, the involvement of the community is also important to increase the transparency of the state budget discussions.