  1. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  2. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  3. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  4. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  5. Project Management Information System: the Role and the Issues of Implementation

    Directory of Open Access Journals (Sweden)

    Dumitru OPREA

    2006-01-01

    Full Text Available We are coping more and more with the project and project management in day by day life. Even if some activities are the similarly with common organization actions, the life cycle project activities request more information and more actions. So it is necessary to have some tools, methods and rules to manage a large amount of information which must be disseminated to numerous stakeholders. This need could be solved by project management information systems (PMIS. PMIS is a complex one, with various components which are depending on type of project, type of organization etc. The latest evolution of information and communication technology was favorable to our research field. Therefore, there are different tools to support the structure, automation and efficiency of PMIS. Moreover from several years it is spread the following notions: web-based project management, project management office, enterprise project management. So, we can see the fast evolution of this field. But, our paper will bring general ideas relating to project management information systems, like definition of PMIS, the project life cycle and the information needed of each stage, various tools to support the PMIS procedures. The characteristics, tools, trends will be our future research.

  6. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  7. Solid waste information and tracking system server conversion project management plan

    International Nuclear Information System (INIS)

    MAY, D.L.

    1999-01-01

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  8. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  9. Integrated project management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-01-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK)

  10. Integrated project management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.-C.; Caupin, G.-M.

    1990-03-01

    The article discusses the desirability of integrated project management systems within the French nuclear power industry. Change in demand for nuclear generation facilities over the last two decades has necessitated a change of policy concerning organization, cost and planning within the industry. Large corporate systems can benefit from integrating equipment and bulk materials tracking. Project management for the nuclear industry will, in future, need to incorporate computer aided design tools and project management information systems data bases as well as equipment and planning data. (UK).

  11. Design of management information system for nuclear industry architectural project costs

    International Nuclear Information System (INIS)

    Zhang Xingzhi; Li Wei

    1996-01-01

    Management Information System (MIS) for nuclear industry architectural project is analysed and designed in detail base on quota management and engineering budget management of nuclear industry in respect of the practice of Qinshan Second Phase 2 x 600 MW Project

  12. The Middle Eastern Regional Irrigation Management Information Systems project-update

    Science.gov (United States)

    The Middle Eastern Regional Irrigation Management Information Systems Project (MERIMIS) was formulated at a meeting of experts from the region in Jordan in 2003. Funded by the U.S. Department of State, it is a cooperative regional project bringing together participants from Israel, Jordan, Palestini...

  13. PROJECT MANAGEMENT INFORMATION SYSTEM: STUDY IN SMALL AND MEDIUM ENTERPRISES OF INDUSTRIAL AUTOMATION

    Directory of Open Access Journals (Sweden)

    Paulo Eduardo Mondin

    2016-12-01

    Full Text Available This article aims to analyze the structuring stage and use of information systems in project management in small and medium-sized companies in the business of providing services in industrial automation. Information systems applied to project management - SIGPs can contribute to decision-making on projects, assisting in the management of reliable information in real time, making it a natural choice for most companies looking to increase performance management of their projects. The research method used was multiple case study, in line with the explanatory nature of the study, when to investigate and perform analytical comparisons on how small and medium-sized enterprises of the studied branch structure and use the SIGPs, considering the contemporary character theme and the possibility of direct observation of the object of study, in addition to conducting interviews. The main results were identified the main gaps in project management in companies and research as the management characteristics of these SMEs have influence in how their projects are managed. It was observed that there is a predominance of features involving scope, time and resources on projects, whereas aspects related to costs, risks, quality, procurement and communications have unimpressive results in relation to structuring.

  14. Management information system for cost-schedule integration control for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Wang Yongqing; Tian Li

    2001-01-01

    Based on the project management experience abroad and at home, a cost-schedule integration control model was developed to improve nuclear power project management. The model integrates cost data with the scheduling data by unity coding to efficiently implement cost-schedule integration control on line. The software system architecture and database is designed and implemented. The system functions include estimating and forecasting dynamically cash flow, scheduling and evaluating deviation from the cost-schedule plan, etc. The research and development of the system should improve the architecture of computer integrated management information systems for nuclear power projects in China

  15. Integrated project-management information systems: the French nuclear industry experience

    Energy Technology Data Exchange (ETDEWEB)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table.

  16. Integrated project-management information systems: the French nuclear industry experience

    International Nuclear Information System (INIS)

    Jacquin, J.C.; Capuin, G.M.

    1988-01-01

    In the early eighties, and in the French case from 1985, the development of the data-processing industry has made the real integration of project-management information systems feasible, and the data-base administration function has been extended to all facets of the engineering process. The new systems had to take into account the existing ones which were still operating efficiently and the new problems encountered due to the changes in the environment. One of these new problems was equipment and materials management, as the period of plants built in series had vanished, and the industry was obliged to build plants individually. The challenge encountered by the French nuclear industry in terms of the project-management information systems was to adapt efficiently to the new situation, and the purpose of this paper is to describe the most-significant elements of this adaptation. The authors review: (2) the objectives established by the company's general management; (2) the organization put into place to reach these objectives; (3) the main choices made; and (4) the economics. 3 references, 1 figure, 1 table

  17. The decommissioning information management system

    International Nuclear Information System (INIS)

    Park, Seung-Kook; Moon, Jei-Kwon

    2015-01-01

    At the Korea Atomic Energy Research Institute (KAERI), the Korea Research Reactor (KRR-2) and one uranium conversion plant (UCP) were decommissioned. A project was launched in 1997, for the decommissioning of KRR-2 reactor with the goal of completion by 2008. Another project for the decommissioning of the UCP was launched in 2001. The physical dismantling works were started in August 2003 and the entire project was completed by the end of 2010. KAERI has developed a computer information system, named DECOMMIS, for an information management with an increased effectiveness for decommissioning projects and for record keeping for the future decommissioning projects. This decommissioning information system consists of three sub-systems; code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites to minimize the time gap between the dismantling activities and the evaluation of the data by the project staff. The DDPS provides useful information to the staff for more effective project management and this information includes several fields, such as project progress management, man power management, waste management, and radiation dose control of workers and so on. The DECOMMIS was applied to the decommissioning projects of the KRR-2 and the UCP, and was utilized to give information to the staff for making decisions regarding the progress of projects. It is also to prepare the reference data for the R and D program which is for the development of the decommissioning engineering system tools and to maintain the decommissioning data for the next projects. In this paper, the overall system will be explained and the several examples of its utilization, focused on waste management and manpower control, will be introduced. (author)

  18. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  19. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  20. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  1. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  2. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  3. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  4. Information management for decommissioning projects

    International Nuclear Information System (INIS)

    LeClair, A.N.; Lemire, D.S.

    2011-01-01

    This paper explores the importance of records and information management for decommissioning projects. Key decommissioning information and elements of a sound information management strategy are identified. Various knowledge management strategies and tools are discussed as opportunities for leveraging decommissioning information. The paper also examines the implementation of Atomic Energy of Canada Limited's (AECL) strategy for the long term preservation of decommissioning information, and its initiatives in leveraging of information with the application of several knowledge management strategies and tools. The implementation of AECL's strategy illustrates common as well as unique information and knowledge management challenges and opportunities for decommissioning projects. (author)

  5. Investments in information systems and technology in the healthcare: Project management mediation

    Directory of Open Access Journals (Sweden)

    Jorge Gomes

    2017-03-01

    Full Text Available Healthcare organisations must improve their business practices and internal procedures in order to answer the increasing demand of health professionals and the general public for more and better information. Hospitals invest massively in information systems and technology (IS/IT in the hope that these investments will improve healthcare and meet patients’ demands. The main objective of our research is to study how organisational maturity, enhanced by investments in IS/IT, project management and best practices, leads to successful projects in public healthcare organisations. The rational of our model is that organisational maturity has a positive effect on IS/IT project success, and that this success is also positively enhanced by the use of project management practices. We emphasise that this combination of approaches can increase the effectiveness of projects. Furthermore, it can also improve the confidence that the results of investments will meet stakeholders’ expectations.

  6. Information System Development: Can Traditional Project Management Tools Be Successful in Post-Industrial Organizations?

    DEFF Research Database (Denmark)

    Carugati, Andrea

    2002-01-01

    Literature on project management of information systems development suggests practices based on success stories in industrial organizations. Recent trends towards post-industrial organizational forms and loosely coupled networked organizations raise questions regarding the applicability of these ...... of information systems development projects in post-industrial organizations. The guidelines are both the result of post-rationalization of the team members and of the case analysis....

  7. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  8. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  9. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Crump, K.

    1978-01-01

    An Australian university architect studying management information systems programs at academic institutions in the United States visited 26 universities and colleges and nine educational and professional associations, including extended visits at the University of Wisconsin and the National Center of Higher Education Management Systems. During these visits, he investigated university and college space utilization programs, gained operational and developmental experience at institutions with education philosophies similar to those in Australia, and examined trends in low cost student housing. This report of his observations focusses on management information systems projects throughout the academic community, resource accountability, energy conservation, facilities planning for the handicapped, student housing, and interdisciplinary approaches to education.

  10. Witwatersrand Water Ingress Project - Information Management System (WWIPIMS), South Africa

    Energy Technology Data Exchange (ETDEWEB)

    Hild, S.; Sieste, M.; Barth, A.; Rudinskaya, J. [Beak Consultants GmbH, Freiberg (Germany); Croukamp, L.; Roos, M. [Council for Geoscience (CGS), Pretoria (South Africa)

    2006-07-01

    The Witwatersrand Water Ingress Project at the Council for Geoscience, South Africa (CGS) deals with an inventory, a risk assessment and the development of rehabilitation strategies for abandoned mining sites in the Witwatersrand Mining Basin. The main focus is the prevention of water ingress and to understand the future decanting scenario. An Information Management System consisting of both a relational database and an application for the Witwatersrand Water Ingress Project is established for accessing and managing all project-related data. This easy to use application makes the data available to all staff at the CGS via several modules as well as a GIS-component for accessing and querying spatial data. This will enable the scientists to derive further knowledge of the water flowing processes by directly using all of the existing up-to-date data. Many additional functions, such as the support for map printing on demand, extensive possibilities for inquiries, data import and export, diagrams and a GIS-viewer for spatial inquiries do complete the system. (orig.)

  11. Z-Plant material information tracking system (ZMITS) software development and integration project management plan

    International Nuclear Information System (INIS)

    IBSEN, T.G.

    1999-01-01

    This document plans for software and interface development governing the implementation of ZMITS and other supporting systems necessary to manage information for material stabilization needs of the Project Hanford Management Contract (PHMC)

  12. GRIN-Global: An International Project to Develop a Global Plant Genebank Information Management System

    Science.gov (United States)

    The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...

  13. INFORMATION TECHNOLOGIES IN MANAGEMENT OF ENERGY SAVING PROJECTS

    Directory of Open Access Journals (Sweden)

    Дмитро Валерійович МАРГАСОВ

    2015-06-01

    Full Text Available The information technology structure is considered of energy saving projects. The project management diagram of energy saving projects is developed, using GIS, ICS, BIM and other control and visual systems.

  14. Information management needs for Fort Calhoun's design basis reconstitution project

    International Nuclear Information System (INIS)

    Beach, D.R.; Erickson, E.A.; Gambhir, S.K.; Parsons, R.D.

    1989-01-01

    While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is ∼50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately

  15. Underground risk management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Matsuyama, S.; Inoue, M.; Sakai, T.

    2006-03-15

    JCOAL has conducted Joint Research on an Underground Communication and Risk Management Information System with CSIRO of Australia under a commissioned study project for the promotion of coal use starting in fiscal 2002. The goal of this research project is the establishment of a new Safety System focusing on the comprehensive risk management information system by the name of Nexsys. The main components of the system are the Ethernet type underground communication system that represents the data communication base, and the risk management information system that permits risk analysis in real-time and provides decision support based on the collected data. The Nexsys is an open system and is a core element of the underground monitoring system. Using a vast amount of underground data, it is capable of accommodating a wide range of functions that were not available in the past. Because of it, it is possible to construct an advanced underground safety system. 14 figs., 4 tabs.

  16. Management system information of characterization of the dismantling project of Jose Cabrera

    International Nuclear Information System (INIS)

    Gimeno Blesa, M. E.; Martin Palomo, N.; Gomez Rodriguez, C. A.

    2011-01-01

    In the proposed dismantling and decommissioning of the Jose Cabrera NPP is designed and implemented a database of physical and radiological inventory, which provides a powerful tool to optimize the storage, monitoring and control of the characterization data. The database is a useful and reliable management system characterization information that facilitates access and information processing, and ensures their integrity and traceability along of the dismantling project.

  17. Creating Business Value through Agile Project Management and Information Systems Development

    DEFF Research Database (Denmark)

    Kautz, Karlheinz; Johansen, Thomas Heide; Uldahl, Andreas

    2014-01-01

    Value creation through information systems (IS) and information technology (IT) is a major IS research topic. However there still exists an ambiguity and fuzziness of the ‘IS business value’ concept and a lack of clarity surrounding the value creation process. This also true for organizations...... that develop IS/IT and for development technologies like information systems development and project management methods that are applied in the production of IS/IT. The agile method Scrum is one such technology. In the research presented here we studied productivity, quality and employee satisfaction...... with some of the deficiencies in current IS business value research and contribute to filling existing gaps in an IS business value research agenda....

  18. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  19. Djeen (Database for Joomla!'s Extensible Engine): a research information management system for flexible multi-technology project administration.

    Science.gov (United States)

    Stahl, Olivier; Duvergey, Hugo; Guille, Arnaud; Blondin, Fanny; Vecchio, Alexandre Del; Finetti, Pascal; Granjeaud, Samuel; Vigy, Oana; Bidaut, Ghislain

    2013-06-06

    With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. We developed Djeen (Database for Joomla!'s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group.Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material.

  20. Information management for nuclear power stations: project description

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  1. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  2. How do top managers support strategic information system projects and why do they sometimes withhold this support?

    NARCIS (Netherlands)

    Boonstra, A.

    Top management support is an important determinant of information system project success. This is especially the case in complex and large-scale IS projects. Surprisingly, however, there is only limited reliable knowledge about the types of behavior that underlie top management support. Further,

  3. Djeen (Database for Joomla!’s Extensible Engine): a research information management system for flexible multi-technology project administration

    Science.gov (United States)

    2013-01-01

    Background With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. Findings We developed Djeen (Database for Joomla!’s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Conclusion Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group. Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material. PMID:23742665

  4. JPL Project Information Management: A Continuum Back to the Future

    Science.gov (United States)

    Reiz, Julie M.

    2009-01-01

    This slide presentation reviews the practices and architecture that support information management at JPL. This practice has allowed concurrent use and reuse of information by primary and secondary users. The use of this practice is illustrated in the evolution of the Mars Rovers from the Mars Pathfinder to the development of the Mars Science Laboratory. The recognition of the importance of information management during all phases of a project life cycle has resulted in the design of an information system that includes metadata, has reduced the risk of information loss through the use of an in-process appraisal, shaping of project's appreciation for capturing and managing the information on one project for re-use by future projects as a natural outgrowth of the process. This process has also assisted in connection of geographically disbursed partners into a team through sharing information, common tools and collaboration.

  5. Project Management Effectiveness: the choice - formal or informal controls

    Directory of Open Access Journals (Sweden)

    Jon Heales

    2007-12-01

    Full Text Available Development failures and runaway projects in the information systems (IS area can result in substantial losses to organizations, either financially or to a company’s reputation. One important strategy in mitigating risk is the use of effective controls over IS projects. This research investigates the effectiveness of control mechanisms in IS projects, i.e., how they have been established, applied, and how they have evolved throughout the project. We conducted an in-depth study of six information systems projects with six different project managers. We found that formal controls were adopted on project elements with clearly defined project outcomes and informal controls were adopted mainly on project elements that were unclear and often related to people. Furthermore, formal controls were dominant at project initiation and in most cases these controls became less dominant over the project duration. These formal controls were more rigorously applied in external IS projects while informal controls increased in importance throughout the project duration in internally developed projects. We found the existence of informal controls to be very important in helping ensure successful project outcomes.

  6. Disposal Site Information Management System

    International Nuclear Information System (INIS)

    Larson, R.A.; Jouse, C.A.; Esparza, V.

    1986-01-01

    An information management system for low-level waste shipped for disposal has been developed for the Nuclear Regulatory Commission (NRC). The Disposal Site Information Management System (DSIMS) was developed to provide a user friendly computerized system, accessible through NRC on a nationwide network, for persons needing information to facilitate management decisions. This system has been developed on NOMAD VP/CSS, and the data obtained from the operators of commercial disposal sites are transferred to DSIMS semiannually. Capabilities are provided in DSIMS to allow the user to select and sort data for use in analysis and reporting low-level waste. The system also provides means for describing sources and quantities of low-level waste exceeding the limits of NRC 10 CFR Part 61 Class C. Information contained in DSIMS is intended to aid in future waste projections and economic analysis for new disposal sites

  7. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  8. Change management in information systems projects for public organizations

    Directory of Open Access Journals (Sweden)

    Ewa Ziemba

    2015-08-01

    Full Text Available It can be argued that public organizations, in order to provide the public with sufficient services in the current, highly competitive and continuously evolving environment, require changes. The changes that become necessary are often related to the implementation of information systems (IS. Moreover, when organizations are faced with changes, a change management (CM process needs to be put in place. CM theories that are currently available to practitioners and academics are often contradictory; they mostly lack empirical evidence and are supported by unchallenged hypotheses concerning the nature of the contemporary CM. The aim of this paper is, therefore, to identify critical success factors (CFSs for CM in IS projects. In order to reach this aim an explanation of changes in public organizations and the nature of CM are presented. Following this, a framework of CFSs for CM in IS projects are identified based on the literature review. The paper also examines two IS projects and uses them to demonstrate CFSs influencing CM in IS projects in Polish pubic organizations. A discussion of the research findings is provided and the paper concludes with a presentation of the study’s contributions and limitations as well as the stream of future work.

  9. The intelligent user interface for NASA's advanced information management systems

    Science.gov (United States)

    Campbell, William J.; Short, Nicholas, Jr.; Rolofs, Larry H.; Wattawa, Scott L.

    1987-01-01

    NASA has initiated the Intelligent Data Management Project to design and develop advanced information management systems. The project's primary goal is to formulate, design and develop advanced information systems that are capable of supporting the agency's future space research and operational information management needs. The first effort of the project was the development of a prototype Intelligent User Interface to an operational scientific database, using expert systems and natural language processing technologies. An overview of Intelligent User Interface formulation and development is given.

  10. ON EXPERIENCE OF THE COLLABORATION AND PROJECT MANAGEMENT INFORMATION SYSTEM PODIO IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    Andrii V. Semenets

    2014-12-01

    Full Text Available The Information Technologies role in the medical university management is analyzed. The importance of the application of the electronic document management in the medical universities is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. A Podio collaboration and project management cloud service features overview is presented. The methodology of the Podio capabilities usage to the medical university task management solving is developed. An approaches to the Podio Workspaces and Applications development for the faculties collaboration and project management in the departments of the medical universities are presented. The examples of the Podio features usage to the work-flow automation of the information-analytical and hardware and software support departments of the Ternopil State Medical University named after I. Ja. Horbachevsky are shown.

  11. Status of the Decommissioning Project Management Information System Development of KAERI in 2015

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Park, Seungkook; Park, Heeseong; Song, Chanho

    2015-01-01

    Various information systems have been developed and used at decommissioning sites for planning a project, record keeping for a post management and cost estimation. KAERI is the only one expert group which has decommissioning experiences and KAERI is trying to develop computer code to converge all the data which has been accumulated during KRR-1 and 2 and UCP (Uranium Conversion Plant) decommission. KRR-1 and KRR-2 are TRIGA MARK type of research reactor which were constructed worldwide. Hence, there are many chance to use decommissioning experiences and data when other TRIGA MARK type of research reactors start to decommission. KAERI DPMIS stands for Decommissioning Project Management Information System, which is aiming to re-use of data effectively. As a responsible leading group of Korean decommissioning research field, KAERI has been developing DPMIS application program, which is going to be an important mile stone of decommission industry in Korea. User friendly graphical interface and lots of actual data let people well understood on decommission planning. It is expected that continuous effort and funds will be delivered to this research

  12. Status of the Decommissioning Project Management Information System Development of KAERI in 2015

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Park, Seungkook; Park, Heeseong; Song, Chanho [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    Various information systems have been developed and used at decommissioning sites for planning a project, record keeping for a post management and cost estimation. KAERI is the only one expert group which has decommissioning experiences and KAERI is trying to develop computer code to converge all the data which has been accumulated during KRR-1 and 2 and UCP (Uranium Conversion Plant) decommission. KRR-1 and KRR-2 are TRIGA MARK type of research reactor which were constructed worldwide. Hence, there are many chance to use decommissioning experiences and data when other TRIGA MARK type of research reactors start to decommission. KAERI DPMIS stands for Decommissioning Project Management Information System, which is aiming to re-use of data effectively. As a responsible leading group of Korean decommissioning research field, KAERI has been developing DPMIS application program, which is going to be an important mile stone of decommission industry in Korea. User friendly graphical interface and lots of actual data let people well understood on decommission planning. It is expected that continuous effort and funds will be delivered to this research.

  13. Intelligent information system for waste management; Jaetehuollon aelykaes tietojaerjestelmae

    Energy Technology Data Exchange (ETDEWEB)

    Nuortio, T. [Kuopio Univ. (Finland)

    2005-07-01

    'iWaste - Intelligent Information System for Waste Management' - was a joint project of the University of Kuopio and the Tampere University of Technology. The main objective of the project was to improve the management and use of waste management data. Also the project focused on the development of information management systems. The results of the project are numerous. A study of the present state of information management in the field of waste management was carried out. The studied aspects were for example information needs of different actors and their requirements for the information quality, communication requirements among different actors, and the characteristics and applications of the software products. The conceptual data model of waste management was developed and resulted as the hyper document for connecting waste and information management specialists, and for research and educational purposes. Also, this model can be used for the development of political regulation. Methodologies and models for processing data into information for decision making were developed. The methodologies and models include e.g. data mining techniques, prediction of waste generation and optimisation of waste pick-up and transport. (orig.)

  14. Solid waste information and tracking system client-server conversion project management plan

    International Nuclear Information System (INIS)

    May, D.L.

    1998-01-01

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion. It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents

  15. Customization of Project Management Techniques for the Construction of IT - Information Technology Systems with the Development Methodologies Known as Agile Processes

    Directory of Open Access Journals (Sweden)

    Altino José Mentzingen de Moraes

    2016-08-01

    Full Text Available The theory presented by PMBoK© - Project Management Book of Knowledge [1], edited and maintained by PMI - Project Management Institute, which deals with the issues of how to administrate a Project efficiently and planned, is already widely known and recognized by the world professional community as a strong orientation of best practices and effective working tool in this field. The PMBoK© - Project Management Book of Knowledge directs the Phases and the Disciplines that must be addressed in leading a Project, whether it be, both to meet the construction of projects in Engineering Area or to meet the System Development Projects in the Area of IT - Information Technology. In the latter Area, namely the area of IT - Information Technology, the theory presented by PMBoK© - Project Management Book of Knowledge is already intensively applied for some decades. However, the System Development Methodologies in IT - Information Technology area is being reviewed by the emergence of new technical resources and new visions of interpretation of the business by the Organizations. In that way, this study intends to evaluate the current impact of these revisions (in System Development Methodologies in IT - Information Technology area may result in new versions of the PMBoK© - Project Management Book of Knowledge, which, also implemented revisions and at this moment is in its 5th.Edition. In conclusion, after some simulations in a practical environment, it is verified the usefulness of this paper (and its "Table of Definition of Specific Features of Project", which try to support the decision about what is the best System Development Methodology in IT - Information Technology area to be applied to a specific Project as an effective management and planning tool in corporate real world.

  16. JUICE: a data management system that facilitates the analysis of large volumes of information in an EST project workflow.

    Science.gov (United States)

    Latorre, Mariano; Silva, Herman; Saba, Juan; Guziolowski, Carito; Vizoso, Paula; Martinez, Veronica; Maldonado, Jonathan; Morales, Andrea; Caroca, Rodrigo; Cambiazo, Veronica; Campos-Vargas, Reinaldo; Gonzalez, Mauricio; Orellana, Ariel; Retamales, Julio; Meisel, Lee A

    2006-11-23

    Expressed sequence tag (EST) analyses provide a rapid and economical means to identify candidate genes that may be involved in a particular biological process. These ESTs are useful in many Functional Genomics studies. However, the large quantity and complexity of the data generated during an EST sequencing project can make the analysis of this information a daunting task. In an attempt to make this task friendlier, we have developed JUICE, an open source data management system (Apache + PHP + MySQL on Linux), which enables the user to easily upload, organize, visualize and search the different types of data generated in an EST project pipeline. In contrast to other systems, the JUICE data management system allows a branched pipeline to be established, modified and expanded, during the course of an EST project. The web interfaces and tools in JUICE enable the users to visualize the information in a graphical, user-friendly manner. The user may browse or search for sequences and/or sequence information within all the branches of the pipeline. The user can search using terms associated with the sequence name, annotation or other characteristics stored in JUICE and associated with sequences or sequence groups. Groups of sequences can be created by the user, stored in a clipboard and/or downloaded for further analyses. Different user profiles restrict the access of each user depending upon their role in the project. The user may have access exclusively to visualize sequence information, access to annotate sequences and sequence information, or administrative access. JUICE is an open source data management system that has been developed to aid users in organizing and analyzing the large amount of data generated in an EST Project workflow. JUICE has been used in one of the first functional genomics projects in Chile, entitled "Functional Genomics in nectarines: Platform to potentiate the competitiveness of Chile in fruit exportation". However, due to its ability to

  17. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  18. Use of a Knowledge Management System in Waste Management Projects

    International Nuclear Information System (INIS)

    Gruendler, D.; Boetsch, W.U.; Holzhauer, U.; Nies, R.A.

    2006-01-01

    In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspect will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)

  19. Free and Open Source Management Information Systems and ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    What is the impact of introducing an automated management information system within a microfinance institution or savings and credit cooperative on the employees, the clients and the business processes? The project will involve deployment of an open source management information system (Mifos Vanilla) in two ...

  20. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  1. Information flow in the DAMA project beyond database managers: information flow managers

    Science.gov (United States)

    Russell, Lucian; Wolfson, Ouri; Yu, Clement

    1996-12-01

    To meet the demands of commercial data traffic on the information highway, a new look at managing data is necessary. One projected activity, sharing of point of sale information, is being considered in the Demand Activated Manufacturing Project (DAMA) of the American Textile Partnership (AMTEX) project. A scenario is examined in which 100 000 retail outlets communicate over a period of days. They provide the latest estimate of demand for sewn products across a chain of 26 000 suppliers through the use of bill of materials explosions at four levels of detail. Enabling this communication requires an approach that shares common features with both workflows and database management. A new paradigm, the information flow manager, is developed to handle this situation, including the case where members of the supply chain fail to communicate and go out of business. Techniques for approximation are introduced so as to keep estimates of demand as current as possible.

  2. JUICE: a data management system that facilitates the analysis of large volumes of information in an EST project workflow

    Directory of Open Access Journals (Sweden)

    Martinez Veronica

    2006-11-01

    Full Text Available Abstract Background Expressed sequence tag (EST analyses provide a rapid and economical means to identify candidate genes that may be involved in a particular biological process. These ESTs are useful in many Functional Genomics studies. However, the large quantity and complexity of the data generated during an EST sequencing project can make the analysis of this information a daunting task. Results In an attempt to make this task friendlier, we have developed JUICE, an open source data management system (Apache + PHP + MySQL on Linux, which enables the user to easily upload, organize, visualize and search the different types of data generated in an EST project pipeline. In contrast to other systems, the JUICE data management system allows a branched pipeline to be established, modified and expanded, during the course of an EST project. The web interfaces and tools in JUICE enable the users to visualize the information in a graphical, user-friendly manner. The user may browse or search for sequences and/or sequence information within all the branches of the pipeline. The user can search using terms associated with the sequence name, annotation or other characteristics stored in JUICE and associated with sequences or sequence groups. Groups of sequences can be created by the user, stored in a clipboard and/or downloaded for further analyses. Different user profiles restrict the access of each user depending upon their role in the project. The user may have access exclusively to visualize sequence information, access to annotate sequences and sequence information, or administrative access. Conclusion JUICE is an open source data management system that has been developed to aid users in organizing and analyzing the large amount of data generated in an EST Project workflow. JUICE has been used in one of the first functional genomics projects in Chile, entitled "Functional Genomics in nectarines: Platform to potentiate the competitiveness of Chile in

  3. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  4. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  5. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  6. Information flow in the DAMA Project beyond database managers: Information flow managers

    Energy Technology Data Exchange (ETDEWEB)

    Russell, L. [Argonne National Lab., IL (United States); Wolfson, O.; Yu, C. [Illinois Univ., Chicago, IL (United States)

    1996-03-01

    To meet the demands of commercial data traffic on the information highway, a new look at managing data is necessary. One projected activity, sharing of point-of-sale information, is being considered in the Demand Activated Manufacturing Project of the American Textile Partnership project. A scenario is examined in which 100,000 retail outlets communicate over a period of days. They provide the latest estimate of demand for sewn products across a chain of 26,000 suppliers through the use of bill-of-materials explosions at four levels of detail. A new paradign the information flow manager, is developed to handle this situation, including the case where members of the supply chain fail to communicate and go out of business. Techniques for approximation are introduced to keep estimates of demand as current as possible.

  7. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    International Nuclear Information System (INIS)

    Joyner, William Scott; Knight, Mark A.

    2013-01-01

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information

  8. Implementation of an Integrated Information Management System for the US DOE Hanford Tank Farms Project

    Energy Technology Data Exchange (ETDEWEB)

    Joyner, William Scott; Knight, Mark A.

    2013-11-14

    In its role as the Tank Operations Contractor at the U.S. Department of Energy's site in Hanford, WA, Washington River Protection Solutions, LLC is implementing an integrated document control and configuration management system. This system will combine equipment data with technical document data that currently resides in separate disconnected databases. The new system will provide integrated information, enabling users to more readily identify the documents that relate to a structure, system, or component and vice-versa. Additionally, the new system will automate engineering work processes through electronic workflows, and where practical and feasible provide integration with design authoring tools. Implementation of this system will improve configuration management of the technical baseline, increase work process efficiencies, support the efficient design of future large projects, and provide a platform for the efficient future turnover of technical baseline data and information.

  9. Design and Management of Networked Information Systems

    DEFF Research Database (Denmark)

    Havn, Erling; Bansler, Jørgen P.

    1996-01-01

    In this paper, we present a newly started research project at the Center for Tele-Information at the Technical University of Denmark. The project focuses on the design and management of networked information systems, that is computer-based IS linked by a wide area network and supporting...... research questions:1. What is the essence of the new managerial theories and models and how do they define the role of telecommunications and IT in organizations?2. How are these organizational theories and models implemented in practice?3. How is the design and implementation of information systems...... and networks actually organized and carried out?4. What are the consequences for work content, skills, working conditions, etc.? The research project consists of a theoretical analysis of contemporary management theories as well as a number of in-depth case studies of firms engaged in the design...

  10. Boundary Spanning in Offshored Information Systems Development Projects

    Science.gov (United States)

    Krishnan, Poornima

    2010-01-01

    Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…

  11. Surface Waters Information Management System (SWIMS)

    Data.gov (United States)

    Kansas Data Access and Support Center — The Surface Waters Information Management System (SWIMS) has been designed to meet multi-agency hydrologic database needs for Kansas. The SWIMS project was supported...

  12. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  13. A cost-benefit analysis for materials management information systems.

    Science.gov (United States)

    Slapak-Iacobelli, L; Wilde, A H

    1993-02-01

    The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.

  14. Space Geodesy Project Information and Configuration Management Procedure

    Science.gov (United States)

    Merkowitz, Stephen M.

    2016-01-01

    This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.

  15. Intelligent Information System for Waste Management; Jaetehuollon aelykaes tietojaerjestelmae - iWaste

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, T. [Kuopio Univ. (Finland); Isoaho, S. [Tampere Univ. (Finland)

    2004-07-01

    ''Waste'' - Intelligent Information System for Waste Management - is a joint project of the University of Kuopio and the Tampere University of Technology. The main objective of the project is to create a basis for more comprehensive utilisation and management of waste management data and for the development of database management systems. The results of the project are numerous. A study of the present state of data management in the field of waste management was carried out. The studied aspects were for example information needs of different actors and their requirements for the information quality, interfaces for information exchange between different actors, and the characteristics of the software products. During the second phase of the project, a hyper document describing waste management systems, and a software application for describing material flows and their management will be finalized. Also methodologies and practices for processing data into information, which is needed in the decision making process, will be developed. The developed methodologies include e.g. data mining techniques, and the practices include e.g. the prediction of waste generation and optimisation of waste collection and transport. (orig.)

  16. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  17. Intelligent Information System for Waste Management; Jaetehuollon aelykaes tietojaerjestelmae iWaste

    Energy Technology Data Exchange (ETDEWEB)

    Mustonen, T. [Kuopio Univ. (Finland)

    2003-07-01

    'iWaste' is a project for developing and testing intelligent computational methods for more comprehensive waste management. Important issues are automated reporting, optimisation of waste collection, forecasting of waste formation, data handling of waste disposal sites and simulation and modelling of regional waste management. The main objective of the project is to identify and analyse known sources of information and to link them to the existing information processing systems in the field of waste management. Additionally, the goal is to identify and test functional elements that could be developed further to software products and services. The results of the project can be categorized into three sectors. Firstly, the guidelines for a comprehensive information system in waste management will be created. This includes the requirement specifications of different parties, definitions for the data exchange interfaces and an architectural plan for software products capable of co-operative processing. Secondly, the central parts of the intelligent information system will be piloted using the research database collected in the early stage of the project. The main topics investigated are data quality, the use of Geographical Information Systems (GIS), automated reporting, optimisation of waste collection and forecasting of waste formation. Additionally, the pilot information system can be utilized in derivative projects to speed up the starting phases of them. This makes it possible to create persistent development of waste management information systems both academically and commercially. (orig.)

  18. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  19. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  20. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  1. IAEA safeguards information system re-engineering project (IRP)

    International Nuclear Information System (INIS)

    Whitaker, G.; Becar, J.-M.; Ifyland, N.; Kirkgoeze, R.; Koevesd, G.; Szamosi, L.

    2007-01-01

    The Safeguards Information System Re-engineering Project (IRP) was initiated to assist the IAEA in addressing current and future verification and analysis activities through the establishment of a new information technology framework for strengthened and integrated safeguards. The Project provides a unique opportunity to enhance all of the information services for the Department of Safeguards and will require project management 'best practices' to balance limited funds, available resources and Departmental priorities. To achieve its goals, the Project will require the participation of all stakeholders to create a comprehensive and cohesive plan that provides both a flexible and stable foundation for address changing business needs. The expectation is that high quality integrated information systems will be developed that incorporate state-of-the-art technical architectural standards, improved business processes and consistent user interfaces to store various data types in an enterprise data repository which is accessible on-line in a secure environment. (author)

  2. Design of project management system for 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Zhu Yan; Xu Yuanhui

    1998-01-01

    A framework of project management information system (MIS) for 10 MW high temperature gas-cooled test reactor is introduced. Based on it, the design of nuclear project management information system and project monitoring system (PMS) are given. Additionally, a new method of developing MIS and Decision Support System (DSS) has been tried

  3. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  4. Using accounting information systems by operations managers in a project company

    NARCIS (Netherlands)

    Wouters, Marc; van der Veeken, Henk J.M.

    2002-01-01

    This paper describes the results of a case study that investigated the use of accounting information by operations managers in a road building company. There was considerable preplanning before the execution of project activities, but task uncertainty during execution created the need to take

  5. Management information systems software evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D. [Saudi Aramco, Dhahran (Saudi Arabia). Process and Control Systems Dept.

    1995-11-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco.

  6. Management information systems software evaluation

    International Nuclear Information System (INIS)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D.

    1995-01-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco

  7. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  8. ISCRAM: Information systems for crisis response and management

    International Nuclear Information System (INIS)

    Carle, B.

    2006-01-01

    Information sharing and communication is a key challenge in any crisis situation. With new technologies appearing increasingly faster, and crisis management becoming more complex as more stakeholders get a say in emergency preparedness, the research in the information systems used in emergency preparedness and crisis management is emerging as a multi-disciplinary area. Research and development on decision support systems for radiation protection experts and decision makers and organising complex emergency response exercises are traditionally key domains of expertise in our research group. Together with the UvT (University of Tilburg), and other research groups, we started a series of activities to build a community allowing us to set up collaboration structures and participate in larger projects. The focus of the activities is on all the aspects of design, development, use and evaluation of information systems for crisis response and management. The main objective of this project is to establish a community where both information systems researchers and practitioners (crisis managers and field responders) exchange their experiences and opinions, and learn from each others work. The community helps researchers to get an insight on real life cases and informs professionals about new developments and research. The first goal is to close the loop between research and reality. Formulating new ideas and priorities for research policy makers is an important spin-off of our community building work

  9. Considerations on Risk in Supply Chain Management Information Systems Implementation

    Directory of Open Access Journals (Sweden)

    Valentin-Petru Măzăreanu

    2013-02-01

    Full Text Available Innovation in information and communication technologies resulted in the digital revolution. This kind of revolution is changing the way people work, learn, communicate and manage their businesses. Due to the need to achieve the competitive advantage and to meet the business requirements, we are witnessing an increasing shift from business to e-business and mobile business. In this kind of world solutions like Supply Chain Management (SCM are increasingly appearing. The business success depends on how effective the information system works. Any interruption of the information system will inevitably lead to business loss. To ensure the successful implementation of a SCM project it is necessary to study even from the early stages which are the possible actions / risks / obstacles which might damage in one way or another the execution of the project. The role of the literature and case studies review in the field of interest is undeniable because it provides us with access to the so-called lessons-learned. By using this approach, in this paper, we present the most common risks and risk sources encountered in the implementation projects of SCM type information systems. We also propose a risk identification framework that can be used in the early stages of the implementation project of a Supply Chain Management information system.

  10. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  11. SUCCESS CONCEPT ANALYSIS APPLIED TO THE INFORMATION TECHNOLOGY PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cassio C. Montenegro Duarte

    2012-05-01

    Full Text Available This study evaluates the concept of success in project management that is applicable to the IT universe, from the classical theory associated with the techniques of project management. Therefore, it applies the theoretical analysis associated to the context of information technology in enterprises as well as the classic literature of traditional project management, focusing on its application in business information technology. From the literature developed in the first part of the study, four propositions were prepared for study which formed the basis for the development of the field research with three large companies that develop projects of Information Technology. The methodology used in the study predicted the development of the multiple case study. Empirical evidence suggests that the concept of success found in the classical literature in project management adjusts to the environment management of IT projects. Showed that it is possible to create the model of standard IT projects in order to replicate it in future derivatives projects, which depends on the learning acquired at the end of a long and continuous process and sponsorship of senior management, which ultimately results in its merger into the company culture.

  12. 基于UML的PPP项目融资管理信息系统的分析%Analysis of PPP Project Financing Management Information System Based on UML

    Institute of Scientific and Technical Information of China (English)

    郭卫萍; 何楠

    2012-01-01

    PPP项目融资过程中,为便于各主体之间以及主体与外部环境之间信息的流通与传递,实现PPP项目融资过程中的信息化管理,运用UML可视化建模语言对PPP项目融资管理信息系统进行功能分析,创建用例图、类图和顺序图等,从而为后期开发PPP项目融资管理信息系统奠定基础。%In the process of PPP project financing, in order to facilitate the circulation and transmission of information between the main bodies and between the subject and external environment, and realize the process of information management of the PPP project fi- nancing, this paper uses the visualized modeling language UML throughout the whole process of the design of the PPP project financing management information system, and introduces the concept and features of PPP financing model and the related concepts of UML mod- eling firstly, then analyses the function of the PPP project financing management information system, and finally, analyses PPP project financing management information system with the UML modeling. It creates the use case diagram, the class diagram and the sequence diagram for the PPP project financing management information system. Thus it lays foundation for the later development of PPP project financing management information system.

  13. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  14. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  15. Development of a website and an information system for an European R&D project : the example of the STRATFEED project

    Directory of Open Access Journals (Sweden)

    Baeten V.

    2003-01-01

    Full Text Available The multidisciplinary nature, the international partnership and the large amount of information to be managed in an European project such as STRATFEED, require the development of an information management system. Within the framework of this project, the development of the Internet-oriented computer system required three facets: the data and information collection, the database building and the development of different applications. A tool for the dissemination of results (STRATFEED website with both a public part and a confidential part, a tool for data management (STRATFEED manager, a tool for data queries (STRATFEED explorer and two tools for decision-making (ARIES Decision Support System –– CD-Rom release and STRATFEED Decision Support System – Internet release were developed. The modular concept, which relates to the different topics of the project, facilitates the updating and development of a system according to research progress and user needs. The concept developed for this project can be used for any other project and can easily be adapted to meet new requirements. The example of the STRATFEED project can be accessed at: http://stratfeed.cra.wallonie.be

  16. Management systems oriented to projects: need for its implementation in sports academic institutions

    Directory of Open Access Journals (Sweden)

    Maidelyn Díaz Pérez

    2017-12-01

    Full Text Available The literature refers to the need that all academic institutions have today to use information systems articulated with the different processes that the organization executes. The idea of using this type of system is to convert the available information into knowledge that represents a competitive advantage for the organization. However, despite being a strength for any organization both to manage their strategic information and to manage the information generated by research projects, they are still not widely used. The reality shows that the academic sports institutions of the country and mainly the faculties of physical culture lack a culture in the use of systems to manage different substantive tasks of the center, such as the activity of research projects. It is estimated that if they rely more on the optimal use of the information and knowledge they have at the group level, all their scientific production indicators will be significantly increased. From this scenario, this research aims to expose the main strengths of information and knowledge management systems, mainly those aimed at projects for the stimulation of their use and implementation in academic institutions associated with sports. To achieve this objective, the logical historical method, direct observation, the method of analysis and synthesis, etc. were used. And among the main results obtained in this research there  is the relevance of the use of information management systems and knowledge aimed at projects to contribute to the promotion and success of research activities generated by projects.

  17. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  18. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  19. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  20. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  1. The Impact of PMIS Training: Patterns of Benefit Realization in Project Management Information Systems Training

    Directory of Open Access Journals (Sweden)

    Andrew McCarty

    2017-01-01

    Full Text Available The benefits of project, program, and portfolio management software toolsets can be enhanced through training. Little is known about the realization of positive, beneficial outcomes and Project Management Information System (PMIS training. This research seeks to improve understanding of project management software toolset training practices and outcomes. This study examines the prevalence, effectiveness, and impact-per-hour efficiency of training in real-world organizations. We further explore relationships between individual and organizational characteristics and training outcomes. Formulae for estimating training costs are derived using regression modeling. Surveys were collected from 1,021 active professionals and analyzed using quantitative methods. Research participants were practitioners recruited by eight different companies, industry groups, and professional organizations within the PMIS community. The findings of this research indicate significant differences in utilization, efficacy, and efficiency of PMIS training in practice. The outcomes and methodologies of this study are being incorporated into ongoing research that focuses on improving PMIS training delivery, evaluation, and planning. The outcomes of this research may result in more effective, efficient, and economical PMIS training that is better tailored to the unique needs of each organization.

  2. Information management for nuclear power stations: System Design Concept

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  3. Information Technology in Engineering and Project Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2017-01-01

    Full Text Available Information Technology (IT can be regarded as the use of computers to store, analyze, and manipulate data (Daintith, 2009. With the rapid development of personal computers, IT has been widely applied in nearly every field (Davenport, 2013. This issue presents five papers covering engineering and project management, three of which focus on the application of IT to solve engineering and project management issues, while one presents research into public private partnerships, and another into cash flow forecasting.

  4. High-level-waste records management system: the NRC pilot project

    International Nuclear Information System (INIS)

    Bender, A.; Altomare, P.

    1987-01-01

    The US Nuclear Regulatory Commission (NRC) and the US Dept. of Energy (DOE) have agreed to develop a licensing support system (LSS) to address the records management requirements created by the Nuclear Waste Policy Act (NWPA). The NRC is planning to conduct a negotiated rule making the modify 10CFR2, including rules governing discovery, so that parties to the licensing process will use a single information management system as a source for all licensing-related documents. The successful demonstration of the pilot project has resulted in an operational on-line record management system for NRC-related HLW documents. Both incoming and outgoing documents are being scanned and stored on a mainframe system and on an optical disk. At this writing the optical disk portion of the system is being tested to evaluate its potential use as a future archival and distribution medium for licensing records. Experience gained from this project is being shared with other government agencies that are in the process of using similar technologies to come to grips with the complex records management problem endemic to our information-based society

  5. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  6. Impacts of the Implementation of a Project Management Information System – a Case Study of a Small R

    Directory of Open Access Journals (Sweden)

    Borštnar Mirjana Kljajić

    2014-02-01

    Full Text Available Background: The problems of resources management (human, financial, time in multi-project companies are inherently complex and need to be addressed systematically, in both small and large organizations. Furthermore, there is a need for transparent communication and collaboration within the organization as well as with partnering organizations. There are many methodologies and tools supporting project management, which are themselves complex and are therefore not widely adopted, especially among small companies. Objectives: The aim of this paper is to analyse impact of the implementation of a flexible cloud-based project management information system (PMIS from the human resources, financial management, and collaboration points of view. Method: We have conducted a case study in a small Slovenian research and development company, that has implemented the 4PM PMIS. Results: The findings imply the importance of keeping the balance of the creative processes that are unstructured, rule free and even chaotic, with structured processes monitor and control. Conclusions: The results of the study suggest that the use of “4PM” in support of multi-project management improves human resources and financial management in a collaborative and transparent way when implemented in an open and highly motivated environment

  7. Management Information Systems Research.

    Science.gov (United States)

    Research on management information systems is illusive in many respects. Part of the basic research problem in MIS stems from the absence of standard...decision making. But the transition from these results to the realization of ’satisfactory’ management information systems remains difficult indeed. The...paper discusses several aspects of research on management information systems and reviews a selection of efforts that appear significant for future progress. (Author)

  8. Qualitative Phenomenological Study of Data Management Information System Deployments: Financial Services Industry

    Science.gov (United States)

    Kerns, Dannie J.

    2014-01-01

    The qualitative phenomenological study explored the lived experiences of financial services industry change managers to understand the genesis of low data management information system project adoption rates. The goal of the study was to find methods to improve data management information system adoption rates. The participant pool consisted of 19…

  9. Integrate offsites management with information systems

    Energy Technology Data Exchange (ETDEWEB)

    Valleur, M. (TECHNIP, Paris (France))

    1993-11-01

    Computerized offsites management systems in oil refineries offer a unique opportunity to integrate advanced technology into a coherent refinery information system that contributes to benefits-driven optimal operations: from long-term, multirefinery linear programming (LP) models to sequential control of transfer lineups in the tank farm. There are strong incentives to automate and optimize the offsites operations, and benefits can be quantified to justify properly sized projects. The paper discusses the following: business opportunities, oil movement and advanced technology, project scoping and sizing, review of functional requirements, transfer automation, blending optimal control, on-line analyzers, oil movement and scheduling, organizational issues, and investment and benefits analysis.

  10. Culvert information management system : demonstration project, final report, August 2009.

    Science.gov (United States)

    2009-08-01

    The overall objective of the research was to develop a pilot scale Culvert Information Management System (CIMS) that will : comply with both requirements stipulated by the Governmental Accounting Standards Board (GASB-34) and new federal : storm wate...

  11. MEMS - Munich Energy Management System. FIA Project: Exchange of research information; MEMS - Muenchner Energiemanagement-System. FIA-Projekt - Forschungs-Informations-Austausch

    Energy Technology Data Exchange (ETDEWEB)

    Funk, H.; Fries, W.

    2001-10-01

    The City of Munich developed the project 'Munich Energy-Management-Systems (MEMS)' with financial support from the Federal Ministry of Economy and Technology. The project is based on a system of building automation using as many standard elements of hardware and software as possible. This will guarantee a high degree of independence from suppliers and subcontractors. The project has led to a reliable working base for the evaluation, measuring and control for ca. 150 municipal buildings. (orig.) [German] Mit dem Projekt 'Muenchner Energie-Management-System (MEMS)' erstellte die Landeshauptstadt Muenchen mit finanzieller Unterstuetzung des Bundesministeriums fuer Wirtschaft und Technologie ein auf der Leitzentrale Haustechnik (LZH) basierendes zentrales Energiemanagementsystem. Die Verwendung moeglichst vieler Standards in Hard- und Software ist dabei ein wesentlicher Gesichtspunkt. Dadurch wurde eine weitgehende Unabhaengigkeit von einem einzelnen Hersteller erreicht. Damit wurde ein Erfassungs-, Auswerte- und Steuerungssystem fuer derzeit rund 150 staedtische Gebaeude geschaffen. (orig.)

  12. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  13. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  14. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  15. Using Executive Information Systems to Manage Capital Projects and Facilities.

    Science.gov (United States)

    Kaynor, Robert

    1993-01-01

    In higher education, facilities data are essential for long-term capital and financial planning and for testing assumptions underlying anticipated policy change. Executive information systems should incorporate life-cycle considerations (planning, construction, renovation, and management) and resource linkages (describing interrelationships of…

  16. Medical-Information-Management System

    Science.gov (United States)

    Alterescu, Sidney; Friedman, Carl A.; Frankowski, James W.

    1989-01-01

    Medical Information Management System (MIMS) computer program interactive, general-purpose software system for storage and retrieval of information. Offers immediate assistance where manipulation of large data bases required. User quickly and efficiently extracts, displays, and analyzes data. Used in management of medical data and handling all aspects of data related to care of patients. Other applications include management of data on occupational safety in public and private sectors, handling judicial information, systemizing purchasing and procurement systems, and analyses of cost structures of organizations. Written in Microsoft FORTRAN 77.

  17. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  18. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  19. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  20. A Framework for BIM-Enabled Life-Cycle Information Management of Construction Project

    Directory of Open Access Journals (Sweden)

    Xun Xu

    2014-08-01

    Full Text Available BIM has been widely used in project management, but on the whole the applications have been scattered and the BIM models have not been deployed throughout the whole project life-cycle. Each participant builds their own BIM, so there is a major problem in how to integrate these dynamic and fragmented data together. In order to solve this problem, this paper focuses on BIM-based life-cycle information management and builds a framework for BIM-enabled life-cycle information management. To organize the life-cycle information well, the information components and information flow during the project life-cycle are defined. Then, the application of BIM in life-cycle information management is analysed. This framework will provide a unified platform for information management and ensure data integrity.

  1. Metaphors in Managerial and Employee Sensemaking in an Information Systems Project

    DEFF Research Database (Denmark)

    Hekkala, Riitta; Stein, Mari-Klara; Rossi, Matti

    2018-01-01

    This longitudinal study looks at the metaphors used in a public sector information systems development project from the perspective of cognitive metaphor theory (Lakoff & Johnson,). We examine the use of metaphors by project team members, including representatives of the users, software developers......-intensive situations, metaphor use with unclear intentions and purpose hinders learning and creates more chaos than order. From a practical perspective, our study highlights the relevance of metaphor use for project management. We suggest that intentional selection of metaphors by management could be beneficial...

  2. Materials management information systems.

    Science.gov (United States)

    1996-01-01

    The hospital materials management function--ensuring that goods and services get from a source to an end user--encompasses many areas of the hospital and can significantly affect hospital costs. Performing this function in a manner that will keep costs down and ensure adequate cash flow requires effective management of a large amount of information from a variety of sources. To effectively coordinate such information, most hospitals have implemented some form of materials management information system (MMIS). These systems can be used to automate or facilitate functions such as purchasing, accounting, inventory management, and patient supply charges. In this study, we evaluated seven MMISs from seven vendors, focusing on the functional capabilities of each system and the quality of the service and support provided by the vendor. This Evaluation is intended to (1) assist hospitals purchasing an MMIS by educating materials managers about the capabilities, benefits, and limitations of MMISs and (2) educate clinical engineers and information system managers about the scope of materials management within a healthcare facility. Because software products cannot be evaluated in the same manner as most devices typically included in Health Devices Evaluations, our standard Evaluation protocol was not applicable for this technology. Instead, we based our ratings on our observations (e.g., during site visits), interviews we conducted with current users of each system, and information provided by the vendor (e.g., in response to a request for information [RFI]). We divided the Evaluation into the following sections: Section 1. Responsibilities and Information Requirements of Materials Management: Provides an overview of typical materials management functions and describes the capabilities, benefits, and limitations of MMISs. Also includes the supplementary article, "Inventory Cost and Reimbursement Issues" and the glossary, "Materials Management Terminology." Section 2. The

  3. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    these objectives should be like. Requirements and effects of the application of project management The goal of the project management methodology is to assist the manager in all of these elements, but also to provide a uniform way of evaluating his performance as an objective comparison of indicators in all projects that are implemented in the system. Project management methodology Efficient business operations and fulfilling the requests of users, or buyers if business is done for the third parties, require modern planning and management of projects using computers and appropriate software. Given that the project management with the help of network models requires frequent and rapid processing of large amount of data, it is obvious that the application of computers in this area is of utmost importance. System of reporting on project implementation To achieve effective monitoring, control and implementation of control actions, it is necessary to organize an effective reporting system that will provide timely and realistic information about the real state of the project, in terms of job performing time, the resources spent and the costs of project implementation. Concept of risk management In any project there are many different risk events by type, the probability of appearance, manner and size of the impact of the project. The process of testing the nature of risk events in the project as well as their potential impact on the outcome of the project and their interdependence are realized through the risk analysis. Conclusion Methodologies of project management surged from these differences, when it became apparent that a unified approach to the problem of project managing does not meet the unique project requirements. Taking into account that in the future projects will become more complex and that the methodology of project management will be required to deal with such projects, a proper selection of methodology within the organization is extremely important.

  4. Development of Nuclear Control and Management Information Treatment System

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, J. G.; Lee, B. D.; So, D. S. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2007-07-01

    To implement obligations under the Non-Proliferation Treaty (NPT) and the bilateral agreements more effectively, we proposed a computerized system named the Nuclear Control and Management Information Treatment System (NCAMITS) as a part of the Nuclear Transparency Enhancement Project at the Korea Atomic Energy Research Institute (KAERI). The database system is designed not only to undertake the facility-level accounting for and control of nuclear material at KAERI, but also to meet the requirements of the State (National) System of Accounting and Control (SSAC). Since the NCAMITS will provide services for the facility operators as well as the safeguard information managers at KAERI, the development of the system is supposed to accommodate the end-user's convenience and the manager's sophisticated specifications as well.

  5. CIMS: The Cartographic Information Management System,

    Science.gov (United States)

    1981-01-01

    use. Large-scale information systems may cover large amounts of information such as the Land Identification and Information Management System (LIMS...small computer in managing the information holdings of a mapping institute. The result is the Cartographic Information Management System (CIMS), a...American countrie.s. 1 .- - _ _ _ _. = _ m m m THE CARTOGRAPHIC INFORMATION MANAGEMENT SYSTEM System Rationale Interactive computer-assisted cartography

  6. The Information Tekhnology Share In Management Information System

    Directory of Open Access Journals (Sweden)

    Nur Zeina Maya Sari

    2015-08-01

    Full Text Available Abstract Management Information System growth cause change of role from all manager in decision making the information technology. While prima facie reason for the usage of information technology in business to support such a manner so that information system may operate better OBrienamp Marakas 2004. Its meaning with existence of information tekhnology in management information system SIM company management decision making which initially often pursued by many factor of non technical become accurately is relevant complete and on schedule

  7. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  8. The Perceived Impact of the Agile Development and Project Management Method Scrum on Information Systems and Software Development Productivity

    DEFF Research Database (Denmark)

    Kautz, Karlheinz; Johansen, Thomas Heide; Uldahl, Andreas

    2013-01-01

    This research contributes to the body of knowledge in information systems development (ISD) with an empirical investigation in form of a case study that demonstrates the positive impact of the agile development and project management method Scrum on information systems and software development...... productivity and it provides a useful operationalization of the concept through seven identified indicators for productivity. Despite the fact that the case unit had challenges with the use of Scrum, the indicators identified the areas where the company had managed to exploit the potential of Scrum and its...... practices with regard to increasing productivity. The research results are discussed both with regard to the existing Scrum literature as well as to complex adaptive systems (CAS) as a foundation for ISD and agile development....

  9. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    Science.gov (United States)

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  10. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  11. Laboratory information management system: an example of international cooperation in Namibia.

    Science.gov (United States)

    Colangeli, Patrizia; Ferrilli, Monica; Quaranta, Fabrizio; Malizia, Elio; Mbulu, Rosa-Stella; Mukete, Esther; Iipumbu, Lukas; Kamhulu, Anna; Tjipura-Zaire, Georgina; Di Francesco, Cesare; Lelli, Rossella; Scacchia, Massimo

    2012-01-01

    The authors describe the project undertaken by the Istituto G. Caporale to provide a laboratory information management system (LIMS) to the Central Veterinary Laboratory (CVL) in Windhoek, Namibia. This robust laboratory management tool satisfies Namibia's information obligations under international quality standard ISO 17025:2005. The Laboratory Information Management System (LIMS) for Africa was designed to collect and manage all necessary information on samples, tests and test results. The system involves the entry of sample data on arrival, as required by Namibian sampling plans, the tracking of samples through the various sections of the CVL, the collection of test results, generation of test reports and monitoring of outbreaks through data interrogation functions, eliminating multiple registrations of the same data on paper records. It is a fundamental component of the Namibian veterinary information system.

  12. Correlation Between Information Technology And Management Information Systems Quality

    Directory of Open Access Journals (Sweden)

    Annisa Fitri Anggraeni

    2015-08-01

    Full Text Available The aim of this research is to find out the correlation between Information Technology and Management Information System Quality. This research applies literature review from various theories and previously conducted research where controversies between Information Technology and Management Information Systems. The result of this research shows that Information Technology is a part of Management Information System and supports the performance of Management Information Systems.

  13. IT Project Management from a Systems Thinking Perspective

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    Purpose: We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. Systems Thinking is a holistic problem solving method in which system behaviour emerges from the interaction of system components.

  14. Distance courses on the subject «Management of information projects» based on technology Moodle

    OpenAIRE

    ZIANGIROVA LINEZA FAATOVNA

    2016-01-01

    The article is devoted to development of a remote course on discipline "Management of information projects" in the direction of preparation "Applied informatics" on the basis of distance learning MOODLE (Modular Object-Oriented Dynamic Learning Environment) system. There are considered the methodology of information systems introduction, decisions introduction organization unified model in the methodologies of Microsoft Solutions Framework (MSF), the project integration and contents managemen...

  15. Progress Scored in Management Information System at CAS

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ CAS initiative to upgrade its management information system (MIS) is making significant progress. Recently, 116 CAS subordinates have completed their online trial operation of a MIS project at the Academy, called Academia Resource Planning (ARP), marking an important phased achievement of the initiative.

  16. Landsat Pathfinder tropical forest information management system

    Science.gov (United States)

    Salas, W.; Chomentowski, W.; Harville, J.; Skole, D.; Vellekamp, K.

    1994-01-01

    A Tropical Forest Information Management System_(TFIMS) has been designed to fulfill the needs of HTFIP in such a way that it tracks all aspects of the generation and analysis of the raw satellite data and the derived deforestation dataset. The system is broken down into four components: satellite image selection, processing, data management and archive management. However, as we began to think of how the TFIMS could also be used to make the data readily accessible to all user communities we realized that the initial system was too project oriented and could only be accessed locally. The new system needed development in the areas of data ingest and storage, while at the same time being implemented on a server environment with a network interface accessible via Internet. This paper summarizes the overall design of the existing prototype (version 0) information management system and then presents the design of the new system (version 1). The development of version 1 of the TFIMS is ongoing. There are no current plans for a gradual transition from version 0 to version 1 because the significant changes are in how the data within the HTFIP will be made accessible to the extended community of scientists, policy makers, educators, and students and not in the functionality of the basic system.

  17. Archival Information Management System.

    Science.gov (United States)

    1995-02-01

    management system named Archival Information Management System (AIMS), designed to meet the audit trail requirement for studies completed under the...are to be archived to the extent that future reproducibility and interrogation of results will exist. This report presents a prototype information

  18. Laboratory information management system: an example of international cooperation in Namibia

    Directory of Open Access Journals (Sweden)

    Patrizia Colangeli

    2012-09-01

    Full Text Available The authors describe the project undertaken by the Istituto G. Caporale to provide a laboratory information management system (LIMS to the Central Veterinary Laboratory (CVL in Windhoek, Namibia. This robust laboratory management tool satisfies Namibia’s information obligations under international quality standard ISO 17025:2005. The Laboratory Information Management System (LIMS for Africa was designed to collect and manage all necessary information on samples, tests and test results. The system involves the entry of sample data on arrival, as required by Namibian sampling plans, the tracking of samples through the various sections of the CVL, the collection of test results, generation of test reports and monitoring of outbreaks through data interrogation functions, eliminating multiple registrations of the same data on paper records. It is a fundamental component of the Namibian veterinary information system.

  19. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  20. Systems for the management of information in a university context: an investigation of user need. Information systems, Universities, Information strategy

    Directory of Open Access Journals (Sweden)

    Marcella R.

    2004-01-01

    Full Text Available The accessibility, reliability, consistency, and relevance of data underpinning information systems are crucial to its use and effectiveness in a university setting. This article reports on the findings of a research project carried out at a new university, which highlighted the role information plays in the success of the operation and in allowing the institution to evolve and meet the challenges posed by the government, students and other stakeholders. Data were gathered from the academic and administrative staff of the university through interviews with senior managers, and a Web-based questionnaire completed by 863 respondents (a 47.9% response rate. The project aimed to explore data and information activities supporting management and strategic decision making in a new university. Project results indicate that there are real deficiencies in the realization of the case institution's information strategy and that these deficiencies must be addressed in developments focusing on improving strategic effectiveness in the future. Particular issues identified included the lack of clarity in responsibility regarding information and concerns about the validity of much of the internally created and maintained data.

  1. Medical Information Management System

    Science.gov (United States)

    Alterescu, S.; Hipkins, K. R.; Friedman, C. A.

    1979-01-01

    On-line interactive information processing system easily and rapidly handles all aspects of data management related to patient care. General purpose system is flexible enough to be applied to other data management situations found in areas such as occupational safety data, judicial information, or personnel records.

  2. CEFR information management system solution

    International Nuclear Information System (INIS)

    Lu Fei; Zhao Jia'ning

    2011-01-01

    Based on finished information resources planning scheme for China sodium cooled experimental fast breeder reactor and the advanced information resources management solution concepts were applied, we got the building solution of CEFR information management systems. At the same time, the technical solutions of systems structures, logic structures, physical structures, development platforms and operation platforms for information resources management system in fast breeder reactors were developed, which provided programmatic introductions for development works in future. (authors)

  3. The Perceived Impact of the Agile Development and Project Management Method Scrum on Information Systems and Software Development Productivity

    Directory of Open Access Journals (Sweden)

    Karlheinz Kautz

    2014-11-01

    Full Text Available This research contributes to the body of knowledge in information systems development (ISD with an empirical investigation in form of a case study that demonstrates the positive impact of the agile development and project management method Scrum on information systems and software development productivity and it provides a useful operationalization of the concept through seven identified indicators for productivity. Despite the fact that the case unit had challenges with the use of Scrum, the indicators identified the areas where the company had managed to exploit the potential of Scrum and its practices with regard to increasing productivity. The research results are discussed both with regard to the existing Scrum literature as well as to complex adaptive systems (CAS as a foundation for ISD and agile development.

  4. Development of a Carbon Management Geographic Information System (GIS) for the United States

    Energy Technology Data Exchange (ETDEWEB)

    Howard Herzog; Holly Javedan

    2009-12-31

    In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Cost Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.

  5. Framework for a comprehensive bridge management and information system.

    Science.gov (United States)

    2011-11-01

    "The purpose of this research project was to provide a framework for the development of a Bridge : Management Information System (BMIS). Researchers developed a synthesis of current BMIS development : activities and identified sources of data availab...

  6. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  7. Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS).

    Energy Technology Data Exchange (ETDEWEB)

    Aas, Christopher A.; Lenhart, James E.; Bray, Olin H.; Witcher, Christina Jenkin

    2004-11-01

    Sandia National Laboratories was tasked with developing the Defense Nuclear Material Stewardship Integrated Inventory Information Management System (IIIMS) with the sponsorship of NA-125.3 and the concurrence of DOE/NNSA field and area offices. The purpose of IIIMS was to modernize nuclear materials management information systems at the enterprise level. Projects over the course of several years attempted to spearhead this modernization. The scope of IIIMS was broken into broad enterprise-oriented materials management and materials forecasting. The IIIMS prototype was developed to allow multiple participating user groups to explore nuclear material requirements and needs in detail. The purpose of material forecasting was to determine nuclear material availability over a 10 to 15 year period in light of the dynamic nature of nuclear materials management. Formal DOE Directives (requirements) were needed to direct IIIMS efforts but were never issued and the project has been halted. When restarted, duplicating or re-engineering the activities from 1999 to 2003 is unnecessary, and in fact future initiatives can build on previous work. IIIMS requirements should be structured to provide high confidence that discrepancies are detected, and classified information is not divulged. Enterprise-wide materials management systems maintained by the military can be used as overall models to base IIIMS implementation concepts upon.

  8. Management Information Systems

    Directory of Open Access Journals (Sweden)

    Furduescu Bogdan-Alexandru

    2017-12-01

    Full Text Available Technology is the science that studies processes, methods and operations run or applied onto raw materials, matters or data, in order to obtain a certain product. Information is the material signal able to launch a material reaction of a dynamic auto-tuning system for which the system is conditioned and finalized. Information Technology is the technology needed for handling (procuring, processing, storing converting and transmitting information, in particular, with the use of computers [Longley, D. & Shain, M. (1985, p. 164]. The importance of IT in the economic growth and development is widely known, taking into account the impact that technology can have on the success and survival, or the failure of the economic activity of enterprises/organizations, IT offering various management information systems (MIS, executive and feedback segments, which all have important and beneficial implications in management and control.

  9. Recording information on protein complexes in an information management system.

    Science.gov (United States)

    Savitsky, Marc; Diprose, Jonathan M; Morris, Chris; Griffiths, Susanne L; Daniel, Edward; Lin, Bill; Daenke, Susan; Bishop, Benjamin; Siebold, Christian; Wilson, Keith S; Blake, Richard; Stuart, David I; Esnouf, Robert M

    2011-08-01

    The Protein Information Management System (PiMS) is a laboratory information management system (LIMS) designed for use with the production of proteins in a research environment. The software is distributed under the CCP4 licence, and so is available free of charge to academic laboratories. Like most LIMS, the underlying PiMS data model originally had no support for protein-protein complexes. To support the SPINE2-Complexes project the developers have extended PiMS to meet these requirements. The modifications to PiMS, described here, include data model changes, additional protocols, some user interface changes and functionality to detect when an experiment may have formed a complex. Example data are shown for the production of a crystal of a protein complex. Integration with SPINE2-Complexes Target Tracker application is also described. Copyright © 2011 Elsevier Inc. All rights reserved.

  10. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  11. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  12. Lessons learned in the deployment of a HIV counseling and testing management information system on a new project.

    Science.gov (United States)

    Makinde, Olusesan A; Ezomike, Chioma F; Lehmann, Harold P; Ibanga, Iko J

    2011-11-28

    To share our experience on how we used simple but detailed processes and deployed a management information system on a new HIV counseling and testing (HCT) project in Nigeria. The procedures used in this study were adopted for their strength in identifying areas of continuous improvement as the project was implemented. We used an iterative brainstorming technique among 30 participants (volunteer counselors and project management staff) as well as iterative quality audits to identify several limitations to the success of the project and to propose solutions. We then implemented the solutions and reevaluated for performance. Findings from the evaluations were then reintroduced into the brainstorming and planning sessions. Several limitations were identified with the most prominent being the poor documentation of records at the site and the lack of a document transfer trail for audit purposes. Communication, cohesion and team focus are necessary to achieve success on any new project. Institutionalizing routine HIV behavioral surveillance using data collected at HCT will help in streamlining interventions that will be evidence-based. 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins

  13. Disabilities Information Flow: A Disabilities Information Management System

    Science.gov (United States)

    Ling, Bin; Allison, Colin; Nicholl, J. Ross; Moodley, Luke; Roberts, Dave

    2006-01-01

    The Disabilities Information Flow (DIF) project at the University of St Andrews has sought to provide a means of efficiently managing all student disabilities information within the institution and provide appropriate role-based service interfaces for all staff who need to routinely interact with this information. This paper describes the software…

  14. Development of advanced JGIS considering qualify management and project management

    International Nuclear Information System (INIS)

    Kawachi, Susumu; Ohi, Takao; Kawamura, Makoto; Ishihara, Yoshinao; Ebina, Takanori

    2008-03-01

    A system for managing and integrating the technical information of R and D was developed (JGIS: JAEA Geological Disposal Information Integration System). The subjects are to improve the usability as the system and the usability to record the information and the data in order to display the function of the system sufficiently and in order to enable the practical use of the system. In this study the aims are to display the function of JGIS and to enable the researchers as the users to recognize the significance of using JGIS. We built the conceptual design in order to implement the function of quality management and project management to JGIS. We considered that researchers could access the portal site of the research projects which were set as the WBS (Work Breakdown Structure) items and could confirm which WBS item the research project belonged to in the whole plan. We also considered that the research projects could be managed by using the conformity assessment sheets which were adopted for the quality management. The appendix contains the example of application of real projects to JGIS and the user's manual of JGIS (Example of a study of potential impact of natural phenomena). We demonstrated that researchers could confirm which WBS item the research project related to in JGIS and could manage the quality of the research projects by using the conformity assessment sheets in JGIS. (author)

  15. Information systems for material flow management in construction processes

    Science.gov (United States)

    Mesároš, P.; Mandičák, T.

    2015-01-01

    The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.

  16. TxDOT's pavement management information system : current status and future directions

    Science.gov (United States)

    1997-12-01

    Phase 2 focuses on improving The Texas Pavement Management Information System (PMIS) implementation at the district level, the goal being to provide sufficient information to move from network to project level decision making. Phase 2 implementation ...

  17. Technology-based management of environmental organizations using an Environmental Management Information System (EMIS): Design and development

    Science.gov (United States)

    Kouziokas, Georgios N.

    2016-01-01

    The adoption of Information and Communication Technologies (ICT) in environmental management has become a significant demand nowadays with the rapid growth of environmental information. This paper presents a prototype Environmental Management Information System (EMIS) that was developed to provide a systematic way of managing environmental data and human resources of an environmental organization. The system was designed using programming languages, a Database Management System (DBMS) and other technologies and programming tools and combines information from the relational database in order to achieve the principal goals of the environmental organization. The developed application can be used to store and elaborate information regarding: human resources data, environmental projects, observations, reports, data about the protected species, environmental measurements of pollutant factors or other kinds of analytical measurements and also the financial data of the organization. Furthermore, the system supports the visualization of spatial data structures by using geographic information systems (GIS) and web mapping technologies. This paper describes this prototype software application, its structure, its functions and how this system can be utilized to facilitate technology-based environmental management and decision-making process.

  18. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  19. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  20. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  1. Data Management Plan and Functional System Design for the Information Management System of the Clinch River Remedial Investigation and Waste Area Grouping 6

    Energy Technology Data Exchange (ETDEWEB)

    Ball, T.; Brandt, C.; Calfee, J.; Garland, M.; Holladay, S.; Nickle, B.; Schmoyer, D.; Serbin, C.; Ward, M. [Oak Ridge National Lab., TN (United States)

    1994-03-01

    The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementation of a common information management strategy that benefits each program.

  2. An Internet-Based Accounting Information Systems Project

    Science.gov (United States)

    Miller, Louise

    2012-01-01

    This paper describes a student project assignment used in an accounting information systems course. We are now truly immersed in the internet age, and while many required accounting information systems courses and textbooks introduce database design, accounting software development, cloud computing, and internet security, projects involving the…

  3. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  4. Managing In-House Development of a Campus-Wide Information System

    Science.gov (United States)

    Shurville, Simon; Williams, John

    2005-01-01

    Purpose: To show how a combination of hard and soft project and change management methodologies guided successful in-house development of a campus-wide information system. Design/methodology/approach: A case study of the methodologies and management structures that guided the development is presented. Findings: Applying a combination of the…

  5. Gulf of Mexico Integrated Science - Tampa Bay Study - Data Information Management System (DIMS)

    Science.gov (United States)

    Johnston, James

    2004-01-01

    The Tampa Bay Integrated Science Study is an effort by the U.S. Geological Survey (USGS) that combines the expertise of federal, state and local partners to address some of the most pressing ecological problems of the Tampa Bay estuary. This project serves as a template for the application of integrated research projects in other estuaries in the Gulf of Mexico. Efficient information and data distribution for the Tampa Bay Study has required the development of a Data Information Management System (DIMS). This information system is being used as an outreach management tool, providing information to scientists, decision makers and the public on the coastal resources of the Gulf of Mexico.

  6. Management Information System

    Science.gov (United States)

    1984-01-01

    New Automated Management Information Center (AMIC) employs innovative microcomputer techniques to create color charts, viewgraphs, or other data displays in a fraction of the time formerly required. Developed under Kennedy Space Center's contract by Boeing Services International Inc., Seattle, WA, AMIC can produce an entirely new informational chart in 30 minutes, or an updated chart in only five minutes. AMIC also has considerable potential as a management system for business firms.

  7. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  8. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  9. Emergency management information system (EMINS)

    International Nuclear Information System (INIS)

    Desonier, L.M.

    1987-01-01

    In a time of crisis or in an emergency, a manager is required to make many decisions to facilitate the proper solution and conclusion to the emergency or crisis. In order to make these decisions, it is necessary for the manager to have correct up-to-date information on the situation, which calls for an automated information display and entry process. The information handling needs are identified in terms of data, video, and voice. Studies of existing Emergency Operations Centers and evaluations of hardware and software have been completed. The result of these studies and investigations is the design and implementation of an automated Emergency Management Information System. Not only is the system useful for Emergency Management but for any information management requirement

  10. A laboratory information management system for DNA barcoding workflows

    NARCIS (Netherlands)

    Vu, D.; Eberhardt, U.; Szöke, S.; Groenewald, M.; Robert, V.

    2012-01-01

    This paper presents a laboratory information management system for DNA sequences (LIMS) created and based on the needs of a DNA barcoding project at the CBS-KNAW Fungal Biodiversity Centre (Utrecht, the Netherlands). DNA barcoding is a global initiative for species identification through simple DNA

  11. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  12. Car insurance information management system

    OpenAIRE

    Sun, Yu

    2015-01-01

    A customer information system is a typical information management system. It involves three aspects, the backstage database establishment, the application development and the system maintenance. A car insurance information management system is based on browser/server structure. Microsoft SQL Server establishes the backstage database. Active Server Pages, from Microsoft as well is used as the interface layer. The objective of this thesis was to apply ASP to the dynamic storage of a web page...

  13. Deaf Effect for Risk Warnings: A Causal Examination applied to Information Systems Projects

    NARCIS (Netherlands)

    A.L.P. Nuijten (Arno)

    2012-01-01

    textabstractEscalation of commitment to a chosen course of action is a phenomenon that shows for example when failing strategic Information Systems (IS) projects are continued for much too long. With this study we contribute to the explanation of why managers (Project Owners) respond with the Deaf

  14. Destination Information Management System for Tourist

    OpenAIRE

    Abdulhamid, Shafii Muhammad; Usman, Gana

    2014-01-01

    The use of information and communication technology in our day to day activities is now unavoidable. In tourism developments, destination information and management systems are used to guide visitors and provide information to both visitors and management of the tour sites. In this paper, information and navigation system was designed for tourists, taking some Niger state of Nigeria tourism destinations into account. The information management system was designed using Java Applet (NetBeans I...

  15. Air System Information Management

    Science.gov (United States)

    Filman, Robert E.

    2004-01-01

    I flew to Washington last week, a trip rich in distributed information management. Buying tickets, at the gate, in flight, landing and at the baggage claim, myriad messages about my reservation, the weather, our flight plans, gates, bags and so forth flew among a variety of travel agency, airline and Federal Aviation Administration (FAA) computers and personnel. By and large, each kind of information ran on a particular application, often specialized to own data formats and communications network. I went to Washington to attend an FAA meeting on System-Wide Information Management (SWIM) for the National Airspace System (NAS) (http://www.nasarchitecture.faa.gov/Tutorials/NAS101.cfm). NAS (and its information infrastructure, SWIM) is an attempt to bring greater regularity, efficiency and uniformity to the collection of stovepipe applications now used to manage air traffic. Current systems hold information about flight plans, flight trajectories, weather, air turbulence, current and forecast weather, radar summaries, hazardous condition warnings, airport and airspace capacity constraints, temporary flight restrictions, and so forth. Information moving among these stovepipe systems is usually mediated by people (for example, air traffic controllers) or single-purpose applications. People, whose intelligence is critical for difficult tasks and unusual circumstances, are not as efficient as computers for tasks that can be automated. Better information sharing can lead to higher system capacity, more efficient utilization and safer operations. Better information sharing through greater automation is possible though not necessarily easy.

  16. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  17. Information technology project risk management in Peru

    OpenAIRE

    Del Carpio Gallegos, Javier

    2014-01-01

    This article shows how some principles, uses, and practices of risk management are applied in information technology projects in Peru; in the last four years, in representative sectors like manufacturing, banking, information and communications, academics institutions, construction, government, consulting, services, and others. El presente artículo muestra algunos principios, usos y prácticas de cómo la gestión de riesgos de proyectos de tecnología se ha llevado a cabo en los últimos cuatr...

  18. Focusing Information Systems Post-Graduate Research Projects

    Directory of Open Access Journals (Sweden)

    Gail Ridley

    1996-11-01

    Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.

  19. River Basin Information System: Open Environmental Data Management for Research and Decision Making

    Directory of Open Access Journals (Sweden)

    Franziska Zander

    2016-07-01

    Full Text Available An open, standardized data management and related service infrastructure is a crucial requirement for a seamless storage and exchange of data and information within research projects, for the dissemination of project results and for their application in decision making processes. However, typical project databases often refer to only one research project and are limited to specific purposes. Once implemented, those systems are often not further maintained and updated, rendering the stored information useless once the system stops operating. The River Basin Information System (RBIS presented here is designed to fit not only the requirements of one research project, but focuses on generic functions, extensibility and standards compliance typically found in interdisciplinary environmental research. Developed throughout more than 10 years of research cooperation worldwide, RBIS is designed to manage different types of environmental data with and without spatial context together with a rich set of metadata. Beside data management and storage, RBIS provides functions for the visualization, linking, analysis and processing of different types of data to support research, decision making, result dissemination and information discovery for all kinds of users. The focus of this paper is on the description of the technical implementation and the presentation of functions. This will be complemented by an overview of example applications and experiences during RBIS development and operation.

  20. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  1. Integrating Environmental and Information Systems Management: An Enterprise Architecture Approach

    Science.gov (United States)

    Noran, Ovidiu

    Environmental responsibility is fast becoming an important aspect of strategic management as the reality of climate change settles in and relevant regulations are expected to tighten significantly in the near future. Many businesses react to this challenge by implementing environmental reporting and management systems. However, the environmental initiative is often not properly integrated in the overall business strategy and its information system (IS) and as a result the management does not have timely access to (appropriately aggregated) environmental information. This chapter argues for the benefit of integrating the environmental management (EM) project into the ongoing enterprise architecture (EA) initiative present in all successful companies. This is done by demonstrating how a reference architecture framework and a meta-methodology using EA artefacts can be used to co-design the EM system, the organisation and its IS in order to achieve a much needed synergy.

  2. NUMO-RMS: a practical requirements management system for the long-term management of the deep geological disposal project - 16304

    International Nuclear Information System (INIS)

    Ueda, Hiroyoshi; Suzuki, Satoru; Ishiguro, Katsuhiko; Oyamada, Kiyoshi; Yashio, Shoko; White, Matt; Wilmot, Roger

    2009-01-01

    NUMO (Nuclear Waste Management Organization of Japan) has the responsibility for implementing deep geological disposal of high-level (HLW) and transuranic (TRU) radioactive waste from the Japanese nuclear programme. A formal Requirements Management System (RMS) is planned to efficiently and effectively support the computerised implementation of the management strategy and the methodology required to drive the step-wise siting processes, and the following repository operational phase,. The RMS will help in the comprehensive management of the decision-making processes in the geological disposal project, in change management as the disposal system is optimised, in driving projects such as the R and D programme efficiently, and in maintaining structured records regarding past decisions, all of which lead to soundness of the project in terms of long-term continuity. The system is planned to have information handling and management functions using a database that includes the decisions/requirements in the programme under consideration, the way in which these are structured in terms of the decision-making process and other associated information. A two-year development programme is underway to develop and enhance an existing trial RMS to a practical system. Functions for change management, history management and association with the external timeline management system are being implemented in the system development work. The database format is being improved to accommodate the requirements management data relating to the facility design and to safety assessment of the deep geological repository. This paper will present an outline of the development work with examples to demonstrate the system's practicality. In parallel with the system/database developments, a case research of the use of requirements management in radioactive waste disposal projects was undertaken to identify key issues in the development of an RMS for radioactive waste disposal and specify a number of

  3. Guidelines for Management Information Systems in Canadian Health Care Facilities

    Science.gov (United States)

    Thompson, Larry E.

    1987-01-01

    The MIS Guidelines are a comprehensive set of standards for health care facilities for the recording of staffing, financial, workload, patient care and other management information. The Guidelines enable health care facilities to develop management information systems which identify resources, costs and products to more effectively forecast and control costs and utilize resources to their maximum potential as well as provide improved comparability of operations. The MIS Guidelines were produced by the Management Information Systems (MIS) Project, a cooperative effort of the federal and provincial governments, provincial hospital/health associations, under the authority of the Canadian Federal/Provincial Advisory Committee on Institutional and Medical Services. The Guidelines are currently being implemented on a “test” basis in ten health care facilities across Canada and portions integrated in government reporting as finalized.

  4. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  5. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  6. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  7. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  8. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  9. Information systems for risk management

    OpenAIRE

    Michael S. Gibson

    1997-01-01

    Risk management information systems are designed to overcome the problem of aggregating data across diverse trading units. The design of an information system depends on the risk measurement methodology that a firm chooses. Inherent in the design of both a risk management information system and a risk measurement methodology is a tradeoff between the accuracy of the resulting measures of risk and the burden of computing them. Technical progress will make this tradeoff more favorable over time...

  10. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    Science.gov (United States)

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  11. Information Security Management System toolkit

    OpenAIRE

    Καραμανλής, Μάνος; Karamanlis, Manos

    2016-01-01

    Secure management of information is becoming critical for any organization because information is one of the most valuable assets in organization’s business operations. An Information security management system (ISMS) consists of the policies, procedures, guidelines, and associated resources and activities, collectively managed by an organization, in the pursuit of protecting its information assets. An ISMS is a systematic approach for establishing, implementing, operating, mon...

  12. Audit Information Management System

    Data.gov (United States)

    US Agency for International Development — USAID/OIG has initiated its new Audit Information Management System (AIMS) to track OIG's audit recommendations and USAID's management decisions. OIG's in-house...

  13. Project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  14. Strategic management of health care information systems: nurse managers' perceptions.

    Science.gov (United States)

    Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha

    2009-01-01

    The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.

  15. Geographic Information Systems-Transportation ISTEA management systems server-net prototype pooled fund study: Phase B summary

    Energy Technology Data Exchange (ETDEWEB)

    Espinoza, J. Jr.; Dean, C.D.; Armstrong, H.M. [and others

    1997-06-01

    The Geographic Information System-Transportation (GIS-T) ISTEA Management Systems Server Net Prototype Pooled Fund Study represents the first national cooperative effort in the transportation industry to address the management and monitoring systems as well as the statewide and metropolitan transportation planning requirements of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The Study was initiated in November 1993 through the Alliance for Transportation Research and under the leadership of the New Mexico State Highway and Transportation Department. Sandia National Laboratories, an Alliance partner, and Geographic Paradigm Computing. Inc. provided technical leadership for the project. In 1992, the Alliance for Transportation Research, the New Mexico State Highway and Transportation Department, Sandia National Laboratories, and Geographic Paradigm Computing, Inc., proposed a comprehensive research agenda for GIS-T. That program outlined a national effort to synthesize new transportation policy initiatives (e.g., management systems and Intelligent Transportation Systems) with the GIS-T server net ideas contained in the NCHRP project {open_quotes}Adaptation of GIS to Transportation{close_quotes}. After much consultation with state, federal, and private interests, a project proposal based on this agenda was prepared and resulted in this Study. The general objective of the Study was to develop GIS-T server net prototypes supporting the ISTEA requirements for transportation planning and management and monitoring systems. This objective can be further qualified to: (1) Create integrated information system architectures and design requirements encompassing transportation planning activities and data. (2) Encourage the development of functional GIS-T server net prototypes. (3) Demonstrate multiple information systems implemented in a server net environment.

  16. A Framework for BIM-enabled Life-cycle Information Management of Construction Project

    OpenAIRE

    Xu, n; Ma, Ling; Ding, Lieyun

    2014-01-01

    BIM has been widely used in project management, but on the whole the applications have been scattered and the BIM models have not been deployed throughout the whole project life-cycle. Each participant builds their own BIM, so there is a major problem in how to integrate these dynamic and fragmented data together. In order to solve this problem, this paper focuses on BIM- based life-cycle information management and builds a framework for BIM-enabled life-cycle information management. To organ...

  17. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  18. Federal Emergency Management Information System (FEMIS) data management guide, version 1.4.5

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, R.A.; Downing, T.R.; Gaustad, K.L. [and others

    1998-06-26

    The Federal Emergency Management Information System (FEMIS) information resources are described in this FEMIS Data Management Guide. To comprehend what types of data are present, where the data is located, and how it is managed during the life span of the system, a basic understanding of the FEMIS architecture is necessary. The system is being developed by Pacific Northwest National Laboratory (PNNL) and is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). The capability to connect to remote CSEPP sites and share information will be present in a future release. Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide efficient EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links. FEMIS is a client/server system where much of the application software is located in the client PC. This client software integrates the FEMIS application, government furnished dispersion and evacuation models, and Commercial-Off-The-Shelf (COTS) software tools such as the ArcView geographic information system (GIS) and Microsoft Project (electron planning). A UNIX server provides data management services, ARC/INFO GIS capabilities, evacuation (Evac) modeling, electron main (E-mail), and meteorological (Met) input processing. A PC communication utility is available to interface with external subsystems. At this time, the weather collection system (Handar Met System) is the only external subsystem.

  19. Management information system of medical equipment using mobile devices

    Science.gov (United States)

    Núñez, C.; Castro, D.

    2011-09-01

    The large numbers of technologies currently incorporated into mobile devices transform them into excellent tools for capture and to manage the information, because of the increasing computing power and storage that allow to add many miscellaneous applications. In order to obtain benefits of these technologies, in the biomedical engineering field, it was developed a mobile information system for medical equipment management. The central platform for the system it's a mobile phone, which by a connection with a web server, it's capable to send and receive information relative to any medical equipment. Decoding a type of barcodes, known as QR-Codes, the management process is simplified and improved. These barcodes identified the medical equipments in a database, when these codes are photographed and decoded with the mobile device, you can access to relevant information about the medical equipment in question. This Project in it's actual state is a basic support tool for the maintenance of medical equipment. It is also a modern alternative, competitive and economic in the actual market.

  20. Management information systems. [United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    Hartley, D.; Spence, A.C.

    1985-02-01

    The successful application in the United Kingdom of the real time monitoring and control systems (MINOS) for underground mining operations, particularly in coal transport and the development of coalface monitoring (FIDO) in 1980 led naturally to the design of an operational data base for management. A User Group of experienced colliery managers produced a Management Information System (MIS) requirements specification and began the evolution of the systems of today. Twenty-four mines operate MIS in different ways from total dependency to a means of checking their manual reporting system. MIS collects useful data from all the major MINOS applications and provides a means of manually inputting other, relevant information. A wide variety of displays and reports are available to management, adjusted to meet individual requirements. The benefits from the use of MIS are difficult to quantify, since they become part of the management process. Further developments are taking place based on operational experience and requirements and taking advantage of the recent advances in computer technology. MIS is the modern management tool in British coal mining, collecting, storing, analysing and presenting accurate information upon which management decision making is based.

  1. Consonance in Information System Projects: A Relationship Marketing Perspective

    Science.gov (United States)

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  2. An information management system for a spent nuclear fuel interim storage facility

    International Nuclear Information System (INIS)

    Horak, K.; Giles, T.; Finch, R.; Jow, H.N.; Chiu, H.L.

    2010-01-01

    We describe an integrated information management system for an independent spent fuel dry-storage installation (ISFSI) that can provide for (1) secure and authenticated data collection, (2) data analysis, (3) dissemination of information to appropriate stakeholders via a secure network, and (4) increased public confidence and support of the facility licensing and operation through increased transparency. This information management system is part of a collaborative project between Sandia National Laboratories, Taiwan Power Co., and the Fuel Cycle Materials Administration of Taiwan's Atomic Energy Council, which is investigating how to implement this concept.

  3. An information management system for a spent nuclear fuel interim storage facility.

    Energy Technology Data Exchange (ETDEWEB)

    Finch, Robert J.; Chiu, Hsien-Lang (Taiwan Power Co., Taipei, 10016 Taiwan); Giles, Todd; Horak, Karl Emanuel; Jow, Hong-Nian (Jow International, Kirkland, WA)

    2010-12-01

    We describe an integrated information management system for an independent spent fuel dry-storage installation (ISFSI) that can provide for (1) secure and authenticated data collection, (2) data analysis, (3) dissemination of information to appropriate stakeholders via a secure network, and (4) increased public confidence and support of the facility licensing and operation through increased transparency. This information management system is part of a collaborative project between Sandia National Laboratories, Taiwan Power Co., and the Fuel Cycle Materials Administration of Taiwan's Atomic Energy Council, which is investigating how to implement this concept.

  4. A highly scalable information system as extendable framework solution for medical R&D projects.

    Science.gov (United States)

    Holzmüller-Laue, Silke; Göde, Bernd; Stoll, Regina; Thurow, Kerstin

    2009-01-01

    For research projects in preventive medicine a flexible information management is needed that offers a free planning and documentation of project specific examinations. The system should allow a simple, preferably automated data acquisition from several distributed sources (e.g., mobile sensors, stationary diagnostic systems, questionnaires, manual inputs) as well as an effective data management, data use and analysis. An information system fulfilling these requirements has been developed at the Center for Life Science Automation (celisca). This system combines data of multiple investigations and multiple devices and displays them on a single screen. The integration of mobile sensor systems for comfortable, location-independent capture of time-based physiological parameter and the possibility of observation of these measurements directly by this system allow new scenarios. The web-based information system presented in this paper is configurable by user interfaces. It covers medical process descriptions, operative process data visualizations, a user-friendly process data processing, modern online interfaces (data bases, web services, XML) as well as a comfortable support of extended data analysis with third-party applications.

  5. Using risk-informed asset management for feedwater system preventative maintenance optimization

    International Nuclear Information System (INIS)

    Kee, Ernest; Sun, Alice; Richards, Andrew; Grantom, Rick; Liming, James; Salter, James

    2004-01-01

    The initial development of a South Texas Project Nuclear Operating Company process for supporting preventative maintenance optimization by applying the Balance-Of-Plant model and Risk-Informed Asset Management alpha-level software applications is presented. Preventative maintenance activities are evaluated in the South Texas Project Risk-Informed Asset Management software while the plant maintains or improves upon high levels of nuclear safety. In the Balance-Of-Plant availability application, the level of detail in the feedwater system is enhanced to support plant decision-making at the component failure mode and human error mode level of indenture by elaborating on the current model at the super-component level of indenture. The enhanced model and modeling techniques are presented. Results of case studies in feedwater system preventative maintenance optimization sing plant-specific data are also presented. (author)

  6. Management Information Systems at CERN

    CERN Document Server

    Ferguson, J

    1986-01-01

    The specific areas addressed in the study are 1.Management decision support (data presentation, data base management systems â" DBMS, modeling) 2.Text processing, 3.Electronic communication for management purposes, 4.Office automation, 5.Administrative use of Management Information Systems (MIS) and in particular Administrative Data Processing (ADP).

  7. Finance and supply management project execution plan; TOPICAL

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes

  8. Designing an oil spill information management system

    International Nuclear Information System (INIS)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R.

    1995-01-01

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning

  9. Designing an oil spill information management system

    Energy Technology Data Exchange (ETDEWEB)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R. [Univ. of Miami, Coral Gables, FL (United States)

    1995-12-31

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning.

  10. Searching your site's management information systems

    International Nuclear Information System (INIS)

    Marquez, W.; Rollin, C.

    1994-01-01

    The Department of Energy's guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort

  11. Information management system for KNGR

    International Nuclear Information System (INIS)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie; Park, Jaemoon

    1996-01-01

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III

  12. Information management system for KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie [Korea Electric Power Corporation, Seoul (Korea, Republic of); Park, Jaemoon [Korea Power Engineering Co., Inc., Daejeon (Korea, Republic of)

    1996-04-15

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III.

  13. Project Management as a means of knowledge communication for the Information economy

    DEFF Research Database (Denmark)

    Kampf, Constance

    Currently Project Management as a field is understood from an engineering and management perspective as a system of planning, managing and monitoring work processes involved in projects.  The systems focus does not preclude communication as an important element, but it does not synthesize...... communication concepts with project management practices. Understanding Project Management from a communication perspective entails synthesizing key concepts from Knowledge Communication, Knowledge Management and Rhetoric.  From Knowledge Communication, key concepts include Wenger's Communities of Practice...... (1998), Nonaka & Takeuchi´s' SECI model describing the relationship between tacit and explicit knowledge in the context of knowledge creation (1995), and Davenport & Prusak's problematization of knowledge definitions in Working Knowledge (1998, 2000).  From a Knowledge Management Perspective, key...

  14. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-01

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork

  15. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-15

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork.

  16. Solid Waste Information and Tracking System Server Conversion Project Management Plan

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    2000-01-01

    The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion

  17. Development of the Decommissioning Project Management System, DECOMMIS

    International Nuclear Information System (INIS)

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B.

    2007-03-01

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies

  18. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  19. Risk management in methodologies of information technology and communications projects

    Directory of Open Access Journals (Sweden)

    Jonathan Carrillo

    2013-12-01

    Full Text Available (Received: 2013/10/02 - Accepted: 2013/12/13At present there are methodologies that have several alternatives and methods to manage projects of Information and Communication Technologies. However, these do not cover a solution for the technology events that can occur in the industry, government, education, among others. In the technology market there are several models to identify and analyze risks according to relevant aspects of their area of specialty e.g. projects, in software development, communications, information security and business alignment. For this reason, this research conducted an evaluation of risk management activities of the methodologies used mostly to know which of them includes more correspondence with basic elements of IT using a rating scale.

  20. HTR-10 management information system

    International Nuclear Information System (INIS)

    Liu Ruoxiao; Wu Zhongwang; Xi Shuren

    2000-01-01

    The HTR-10 Management information system (REMIS) strengthens the managerial level and usage of the information of HTR-10, thereby enhances the ability and efficiency of the design and management work. REMIS is designed based on the Client/Server framework. Database management system is SQL Server 6.5 for NT, While the client side is developed by Borland C ++ Builder, and it is based on Windows 95/98. The network protocol is TCP/IP. REMIS collects date of the HTR-10 at four parameters: Reactor properties, Design parameters, Equipment properties Reactor system flow charts. Final discussing extended prospect of REMIS

  1. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    Science.gov (United States)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  2. EUGRIS: ''European Substainable Land and Groundwater Management Information System''

    Energy Technology Data Exchange (ETDEWEB)

    Frauenstein, J. [Federal Environmental Agency (UBA), Berlin (Germany)

    2003-07-01

    The presentation outlines and Accompanying Measure with the FP 5 to develop an web based EUropean Sustainable Land and GRoundwater Management Information System information system (EUGRIS). The management of contaminated land and groundwater requires an interdisciplinary approach and a considerable amount of supporting technical information and knowledge. EUGRIS will provide a generally available comprehensive and overarching information and innovation resource, to support both research and practical contaminated land and groundwater management. EUGRI is a gateway to provide a 'one stop shop' for information provided by research projects, legislation, standards, best practice and other technical guidance and policy/regulatory publications from the EC, participating Member and Accession States and from various international networks dealing with groundwater and land management issues. Different types of user can access information through different windows according to their needs. EUGRIS will provide its visitors with summary information (digests) and links to sources of more detailed and/or original information in a scaleable holistic and contexturally meaningful way. EUGRIS is being built in three stages: the design of the information system, the development of its software implementation, and the population of the system with information. The presentation is focussed on the concept of the development of the information system with the individual work packages. In the second part of the lecture in particular the work procedures are presented for the content wise replenishment by EUGRIS. The data collation for the proven pilot countries and the production of a European research data base, which opens contents and results of European-wide locked and current projects, form the emphasis thereby. (orig.)

  3. Management Information System Project. Data Processors Manual to the Program Oriented Accounting System: The Budgetary Process.

    Science.gov (United States)

    Foley, Walter; Harr, Gordon

    The purpose of this manual is to serve the needs of a data processing facility in the operation of a management information system (MIS). Included in the manual are system flowcharts, job control language, and system documentation. The system has been field tested and operates under IBM System 360/Model 65-05-MVT-HASP. The programing language is…

  4. Automated transmission system operation and management : meeting stakeholder information needs

    Energy Technology Data Exchange (ETDEWEB)

    Peelo, D.F.; Toom, P.O. [British Columbia Hydro, Vancouver, BC (Canada)

    1998-12-01

    Information monitoring is considered to be the fundamental basis for moving beyond substation automation and into automated transmission system operation and management. Information monitoring was defined as the acquisition of data and processing the data into decision making. Advances in digital technology and cheaper, more powerful computing capability has made it possible to capture all transmission stakeholder needs in a shared and automated operation and management system. Recognizing that the key to success in the development of transmission systems is automation, BC Hydro has initiated a long-term research and development project to develop the structure and detail of transmission system automation. The involvement of partners, be they utility or equipment suppliers, is essential in order to deal with protocol and similar issues. 3 refs., 1 tab., 3 figs.

  5. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  6. Development of the Decommissioning Project Management System, DECOMMIS

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-03-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies.

  7. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  8. School Management Information Systems in Primary Schools

    Science.gov (United States)

    Demir, Kamile

    2006-01-01

    Developments in information technologies have been impacting upon educational organizations. Principals have been using management information systems to improve the efficiency of administrative services. The aim of this research is to explore principals' perceptions about management information systems and how school management information…

  9. Smart use of data, information and communication: the INFORM-ed Best Local Practice Project--Grafton Base Hospital.

    Science.gov (United States)

    Lloyd, Sheree; Collie, Jean; McInnes, Alastair; King, Kevin; Lollback, Alison; Garland, Angie

    This paper describes current progress for an information management project in a medium-sized rural hospital after the first four months of the one-year project. In particular, the article examines some of the project outcomes to date as these relate to the National Hospitals and Health Reform recommendations for the smart use of data, information and communication. The paper identifies a number of important challenges and issues that have been addressed by the project and proposes that the project findings may be used to inform similar projects in other settings. These findings relate to clinician requirements for reports, investment in human resources, development, and time for information management activities. An understanding of data collected, information systems, and presentation of clinician data are also important. The benefits of information sharing in assisting quality improvement activities are particularly relevant but, more importantly, they can engage and involve clinicians in the use of information. The importance of local data, information, and knowledge is described. Finally, issues for the health information management profession, such as working collegially and sharing knowledge and expertise, are outlined.

  10. Use of electronic information systems in nursing management.

    Science.gov (United States)

    Lammintakanen, Johanna; Saranto, Kaija; Kivinen, Tuula

    2010-05-01

    The purpose of this study is to describe nurse managers' perceptions of the use of electronic information systems in their daily work. Several kinds of software are used for administrative and information management purposes in health care organizations, but the issue has been studied less from nurse managers' perspective. The material for this qualitative study was acquired according to the principles of focus group interview. Altogether eight focus groups were held with 48 nurse managers from both primary and specialized health care organizations. The nurse managers were asked in focus groups to describe the use of information systems in their daily work in addition to some other themes. The material was analyzed by inductive content analysis using ATLAS.ti computer program. The main category "pros and cons of using information systems in nursing management" summarized the nurse managers' perceptions of using electronic information systems. The main category consisted of three sub-categories: (1) nurse managers' perceptions of the use of information technology; (2) usability of management information systems; (3) development of personnel competencies and work processes. The nurse managers made several comments on the implementation of immature electronic information systems which caused inefficiencies in working processes. However, they considered electronic information systems to be essential elements of their daily work. Furthermore, the nurse managers' descriptions of the pros and cons of using information systems reflected partly the shortcomings of strategic management and lack of coordination in health care organizations. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  11. Developing a decision support system to meet nurse managers' information needs for effective resource management.

    Science.gov (United States)

    Ruland, C M

    2001-01-01

    This article describes the development of a decision support system called CLASSICA, which assists nurse managers in financial management, resource allocation, activity planning, and quality control. CLASSICA integrates information about patient flow and activity, staffing, and the cost of nursing care at the nursing-unit level. The system provides assistance in planning activities, balancing the budget, and identifying barriers to unsatisfactory resource management. In addition, CLASSICA contains forecasting and simulation options to analyze the influence of factors that affect nursing costs. This article describes the system's development process steps to tailor it to the needs of nurse managers and their existing work practices. Nurse managers actively participated in defining their tasks and responsibilities; identified barriers and difficulties in managing these tasks; defined information needs, data input, and output and interface requirements; and identified expected benefits. Clear communication of project goals, strong user involvement, and purposeful benefit planning was used to achieve the goals for CLASSICA: (1) to provide essential information and decision support for effective financial management, resource allocation, activity planning, and staffing; (2) to improve nurse managers' competence in financial management and decision making; (3) to improve cost containment; and (4) to provide a helpful and easy to use tool for decision support.

  12. 76 FR 76917 - Homeless Management Information Systems Requirements

    Science.gov (United States)

    2011-12-09

    ...-P-01] Homeless Management Information Systems Requirements AGENCY: Office of the Assistant Secretary... for the establishment of regulations for Homeless Management Information Systems (HMIS), which are the... community development, Homeless, Information technology system, Management system, Nonprofit organizations...

  13. Management of engineering design information

    International Nuclear Information System (INIS)

    Gray, J.A.

    1991-01-01

    Westinghouse Idaho Nuclear Company, Inc. (WINCO) purchased a Design Management software package called SHERPA for use on the $1 billion Special Isotope Separation Project Sherpa is a customizable software shell that provides for the administrative management of the design function including production, approval, distribution and configuration control of project information. This project information can be either electronic or the traditional paper hardcopy. The use of this computerized system resulted in enhanced productivity and quality performance for the management, engineering, and administrative personnel on the project. The software currently runs on an HP9000 model 835 using the HP-UX operating system. The software had been completely customized to meet specific project needs. Existing databases were converted or left in tact to be accessed through the Sherpa software. Access to the system is available through IBM PCs. Dec terminals, Sun work stations, HP terminals, and X-windows terminals, in short most existing WINCO workstations. The software and hardware were delivered in February of 1990, and the system was on-line with all necessary data converted by the end of ApriL Through the use of the electronic approval function and the highly sophisticated query capabilities of the software, a cost savings of over 1500 personnel hours were realized during the closeout of the Project. The software has since been modified for use in the management of WINCO Environmental Compliance Information including Permits, NEPA, and RECRA documentation and records. Use of this software and hardware has resulted in an increase in quality and a large cost savings to WINCO

  14. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  15. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  16. 20 CFR 633.311 - Management information systems.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  17. A system for managing information at ATLAS

    International Nuclear Information System (INIS)

    Tilbrook, I.R.

    1993-01-01

    In response to a need for better management of maintenance and document information at the Argonne Tandem-Linear Accelerating System (ATLAS), the ATLAS Information Management System (AIMS) has been created. The system is based on the relational database model. The system's applications use the Alpha-4 relational database management system, a commercially available software package. The system's function and design are described

  18. The development of KAERI management information system -First year: The development of manpower information management system-

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Shin Bok; Huh, Young Hwan; Lee, Jong Bok; Park, Soo Jin; Lee, Young Jae; Park, Yeon Sik; Jang, Deok Kyu; Park, Seung Deok; Kim, Jong Myeong [Korea Atomic Energy Res. Inst., Taejon (Korea, Republic of)

    1991-12-01

    The purpose of this report is to describe the implementation of the management information system for manpower. This job is the first year`s for development KAERI management information system. It is important to properly manage a manpower to cope with the external circumstances promptly and to maximize the productivity of the organization. This report aims at basic management of manpower and uses multimedia to keep abreast with the times and introduces the concept of GUI (Graphic User Interface) to user for ease access. (Author).

  19. The development of KAERI management information system -First year: The development of manpower information management system-

    International Nuclear Information System (INIS)

    Kang, Shin Bok; Huh, Young Hwan; Lee, Jong Bok; Park, Soo Jin; Lee, Young Jae; Park, Yeon Sik; Jang, Deok Kyu; Park, Seung Deok; Kim, Jong Myeong

    1991-12-01

    The purpose of this report is to describe the implementation of the management information system for manpower. This job is the first year's for development KAERI management information system. It is important to properly manage a manpower to cope with the external circumstances promptly and to maximize the productivity of the organization. This report aims at basic management of manpower and uses multimedia to keep abreast with the times and introduces the concept of GUI (Graphic User Interface) to user for ease access. (Author)

  20. Hospital managers need management information systems.

    Science.gov (United States)

    Davis, S; Freeman, J R

    1976-01-01

    A new hospital director seeking to bring his institution to the brink of solvency found himself with ten pounds of data but no "information"--at least, not the kind of information he could use as a basis for management decisions. What he needed was a system that would not only present data, but the meaning of the data. Such a system is the integrated MIS.

  1. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  2. Management information system on radiation protection

    Energy Technology Data Exchange (ETDEWEB)

    Grossi, Pablo Andrade; Souza, Leonardo Soares de; Figueiredo, Geraldo Magela, E-mail: pabloag@cdtn.b, E-mail: lss@cdtn.b, E-mail: gmf@cdtn.b [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2011-07-01

    Considering the flux complexity and the multi source information of all radiation protection activities on nuclear organizations, an effective management information system based on technology, information and people is necessary to improve the safety on all processes and operations subjected to radiation risks. An effective management information system is an essential tool to highlight the strengths and weaknesses and identify behaviors and trends on the activities requiring radiation protection programs. Such kind of distinct knowledge is useful to reach an effective management and support the human decision-making on nuclear organization. This paper presents a management information system based on Brazilian directives and regulations on radiation protection. Due to its generic characteristics, this radiation protection control system can be implemented on any nuclear organization by reediting the non restricted parameters which could differ considering all facilities and laboratories expected on-site with diverse technologies applications. This system can be considered as a powerful tool applied on the continuous management of radiation protection activities on nuclear organizations and research institutes as well as for long term planning, not only indicating how the safety activities are going, but why they are not going as well as planned where that is the case. (author)

  3. Management information system on radiation protection

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Souza, Leonardo Soares de; Figueiredo, Geraldo Magela

    2011-01-01

    Considering the flux complexity and the multi source information of all radiation protection activities on nuclear organizations, an effective management information system based on technology, information and people is necessary to improve the safety on all processes and operations subjected to radiation risks. An effective management information system is an essential tool to highlight the strengths and weaknesses and identify behaviors and trends on the activities requiring radiation protection programs. Such kind of distinct knowledge is useful to reach an effective management and support the human decision-making on nuclear organization. This paper presents a management information system based on Brazilian directives and regulations on radiation protection. Due to its generic characteristics, this radiation protection control system can be implemented on any nuclear organization by reediting the non restricted parameters which could differ considering all facilities and laboratories expected on-site with diverse technologies applications. This system can be considered as a powerful tool applied on the continuous management of radiation protection activities on nuclear organizations and research institutes as well as for long term planning, not only indicating how the safety activities are going, but why they are not going as well as planned where that is the case. (author)

  4. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  5. A computerized legal information management system | Ohiagu ...

    African Journals Online (AJOL)

    A computerized legal information management system. ... process through the filling system using the survey research methodology. ... A framework for the design and implementation of a legal information management system was presented.

  6. RIMS: Resource Information Management System

    Science.gov (United States)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  7. PASSIM – an open source software system for managing information in biomedical studies

    Directory of Open Access Journals (Sweden)

    Neogi Sudeshna

    2007-02-01

    Full Text Available Abstract Background One of the crucial aspects of day-to-day laboratory information management is collection, storage and retrieval of information about research subjects and biomedical samples. An efficient link between sample data and experiment results is absolutely imperative for a successful outcome of a biomedical study. Currently available software solutions are largely limited to large-scale, expensive commercial Laboratory Information Management Systems (LIMS. Acquiring such LIMS indeed can bring laboratory information management to a higher level, but often implies sufficient investment of time, effort and funds, which are not always available. There is a clear need for lightweight open source systems for patient and sample information management. Results We present a web-based tool for submission, management and retrieval of sample and research subject data. The system secures confidentiality by separating anonymized sample information from individuals' records. It is simple and generic, and can be customised for various biomedical studies. Information can be both entered and accessed using the same web interface. User groups and their privileges can be defined. The system is open-source and is supplied with an on-line tutorial and necessary documentation. It has proven to be successful in a large international collaborative project. Conclusion The presented system closes the gap between the need and the availability of lightweight software solutions for managing information in biomedical studies involving human research subjects.

  8. Design and practice of a comprehensively functional integrated management information system for major construction

    Science.gov (United States)

    Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan

    2017-08-01

    This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the

  9. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2005-01-01

    Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage......-technical innovation in a situation where the organisational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage...... the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organisational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental...

  10. Information management challenges of the EOS Data and Information System

    Science.gov (United States)

    Mcdonald, Kenneth R.; Blake, Deborah J.

    1991-01-01

    An overview of the current information management concepts that are embodied in the plans for the Earth Observing System Data and Information System (EOSDIS) is presented, and some of the technology development and application areas that are envisioned to be particularly challenging are introduced. The Information Management System (IMS) is the EOSDIS element that provides the primary interface between the science users and the data products and services of EOSDIS. The goals of IMS are to define a clear and complete set of functional requirements and to apply innovative methods and technologies to satisfy them. The information management functions are described in detail, and some applicable technolgies are discussed. Some of the general issues affecting the successful development and operation of the information management element are addressed.

  11. Technical Literature Review Concerning Management Information Systems.

    Science.gov (United States)

    interrelationships of the many aspects of management information systems (MIS); that is, with how analysis, design, operation, evaluation, and user considerations affect management information systems . (Author)

  12. Knowledge structure representation and automated updates in intelligent information management systems

    Science.gov (United States)

    Corey, Stephen; Carnahan, Richard S., Jr.

    1990-01-01

    A continuing effort to apply rapid prototyping and Artificial Intelligence techniques to problems associated with projected Space Station-era information management systems is examined. In particular, timely updating of the various databases and knowledge structures within the proposed intelligent information management system (IIMS) is critical to support decision making processes. Because of the significantly large amounts of data entering the IIMS on a daily basis, information updates will need to be automatically performed with some systems requiring that data be incorporated and made available to users within a few hours. Meeting these demands depends first, on the design and implementation of information structures that are easily modified and expanded, and second, on the incorporation of intelligent automated update techniques that will allow meaningful information relationships to be established. Potential techniques are studied for developing such an automated update capability and IIMS update requirements are examined in light of results obtained from the IIMS prototyping effort.

  13. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  14. Architecture and Functionality of the Advanced Life Support On-Line Project Information System

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriguez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Ames Research Center (ARC) to develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a Web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an research and technology development (R&TD) status information hub that can potentially serve as the primary annual reporting mechanism for ALS-funded projects. Using OPIS, ALS managers and element leads will be able to carry out informed R&TD investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, Controls and Systems Analysis). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  15. Integrating Soft Skill Competencies through Project-Based Learning across the Information Systems Curriculum

    Science.gov (United States)

    Woodward, Belle S.; Sendall, Patricia; Ceccucci, Wendy

    2010-01-01

    Contemporary Information Systems graduates will be more marketable in the workplace upon graduation if they have combined competencies in both technical and soft skills: interpersonal communication, teamwork, time management, planning and organizational skills. Team and project-based learning can be used to incorporate soft skill competencies with…

  16. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2013-02-06

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Brum, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave... to industry's drug development processes and (2) a venue for sharing information about project...

  17. 46 CFR 16.500 - Management Information System requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  18. Some Issues on Management Information System Course Teaching

    OpenAIRE

    Chen, Dingquan

    2008-01-01

    This paper discuses the following issues about Management Information System course for the major of information management & Information System: Teaching Object, the difference between Information System Analysis and Design course, teaching content, and experiment plan.

  19. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  20. Respiratory care management information systems.

    Science.gov (United States)

    Ford, Richard M

    2004-04-01

    Hospital-wide computerized information systems evolved from the need to capture patient information and perform billing and other financial functions. These systems, however, have fallen short of meeting the needs of respiratory care departments regarding work load assessment, productivity management, and the level of outcome reporting required to support programs such as patient-driven protocols. The respiratory care management information systems (RCMIS) of today offer many advantages over paper-based systems and hospital-wide computer systems. RCMIS are designed to facilitate functions specific to respiratory care, including assessing work demand, assigning and tracking resources, charting, billing, and reporting results. RCMIS incorporate mobile, point-of-care charting and are highly configurable to meet the specific needs of individual respiratory care departments. Important and substantial benefits can be realized with an RCMIS and mobile, wireless charting devices. The initial and ongoing costs of an RCMIS are justified by increased charge capture and reduced costs, by way of improved productivity and efficiency. It is not unusual to recover the total cost of an RCMIS within the first year of its operation. In addition, such systems can facilitate and monitor patient-care protocols and help to efficiently manage the vast amounts of information encountered during the practitioner's workday. Respiratory care departments that invest in RCMIS have an advantage in the provision of quality care and in reducing expenses. A centralized respiratory therapy department with an RCMIS is the most efficient and cost-effective way to monitor work demand and manage the hospital-wide allocation of respiratory care services.

  1. Searching your site`s management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Marquez, W.; Rollin, C. [S.M. Stoller Corp., Boulder, CO (United States)

    1994-12-31

    The Department of Energy`s guidelines for the Baseline Environmental Management Report (BEMR) encourage the use of existing data when compiling information. Specific systems mentioned include the Progress Tracking System, the Mixed-Waste Inventory Report, the Waste Management Information System, DOE 4700.1-related systems, Programmatic Environmental Impact Statement (PEIS) data, and existing Work Breakdown Structures. In addition to these DOE-Headquarters tracking and reporting systems, there are a number of site systems that will be relied upon to produce the BEMR, including: (1) site management control and cost tracking systems; (2) commitment/issues tracking systems; (3) program-specific internal tracking systems; (4) Site material/equipment inventory systems. New requirements have often prompted the creation of new, customized tracking systems. This is a very time and money consuming process. As the BEMR Management Plan emphasizes, an effort should be made to use the information in existing tracking systems. Because of the wealth of information currently available from in-place systems, development of a new tracking system should be a last resort.

  2. [Wound information management system: a standardized scheme for acquisition, storage and management of wound information].

    Science.gov (United States)

    Liu, Hu; Su, Rong-jia; Wu, Min-jie; Zhang, Yi; Qiu, Xiang-jun; Feng, Jian-gang; Xie, Ting; Lu, Shu-liang

    2012-06-01

    To form a wound information management scheme with objectivity, standardization, and convenience by means of wound information management system. A wound information management system was set up with the acquisition terminal, the defined wound description, the data bank, and related softwares. The efficacy of this system was evaluated in clinical practice. The acquisition terminal was composed of the third generation mobile phone and the software. It was feasible to get access to the wound information, including description, image, and therapeutic plan from the data bank by mobile phone. During 4 months, a collection of a total of 232 wound treatment information was entered, and accordingly standardized data of 38 patients were formed automatically. This system can provide standardized wound information management by standardized techniques of acquisition, transmission, and storage of wound information. It can be used widely in hospitals, especially primary medical institutions. Data resource of the system makes it possible for epidemiological study with large sample size in future.

  3. Accounting Information Systems Implementation and Management Accounting Change

    Directory of Open Access Journals (Sweden)

    Bredmar Krister

    2014-09-01

    Full Text Available Background: There is an on-going discussion within management accounting research regarding how to work with performance measures. In the process of developing new forms of performance measurement the task of choosing business metrics is central. This process is closely connected to the implementation of IT solutions. Objectives: In order to understand how new performance measurement solutions are implemented and used, it becomes crucial to understand how measures are selected and how new accounting information systems (AIS are developed and implemented. Methods/approach: The paper builds on the case of an on-going AIS project at a large, public university in Sweden. The empirical material was collected using a semi-action research approach over a two-year period. The majority of the material comes from written documentation and minutes. Results: Even though the implementation of a new AIS triggers a change in the management accounting practice, this study shows that this is done in more than one perspective. Conclusions: As the project develops, new priorities and objectives evolve, which in the end shape what management accounting change becomes.

  4. A Collaborative Knowledge Management Process for Implementing Healthcare Enterprise Information Systems

    Science.gov (United States)

    Cheng, Po-Hsun; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei

    This paper illustrates a feasible health informatics domain knowledge management process which helps gather useful technology information and reduce many knowledge misunderstandings among engineers who have participated in the IBM mainframe rightsizing project at National Taiwan University (NTU) Hospital. We design an asynchronously sharing mechanism to facilitate the knowledge transfer and our health informatics domain knowledge management process can be used to publish and retrieve documents dynamically. It effectively creates an acceptable discussion environment and even lessens the traditional meeting burden among development engineers. An overall description on the current software development status is presented. Then, the knowledge management implementation of health information systems is proposed.

  5. Radiological information management system SRIM-10

    International Nuclear Information System (INIS)

    Shibata, Koichi; Goto, Yoshihisa

    1989-01-01

    A radiological information management system, SRIM-10, has been developed using a personal computer, in order to smoothly manage routine works in radiological division of hospitals. Data base is constructed with radiographic data acuqired directly from x-ray apparatus and patient information acquired using ID card. It is possible to record patient information of about 10,000 patients and radiographic data of about 120,000 exposures. This system can be made up as a multi work station system using a local area network. (author)

  6. Radiological information management system SRIM-10

    Energy Technology Data Exchange (ETDEWEB)

    Shibata, Koichi; Goto, Yoshihisa

    1989-03-01

    A radiological information management system, SRIM-10, has been developed using a personal computer, in order to smoothly manage routine works in radiological division of hospitals. Data base is constructed with radiographic data acuqired directly from x-ray apparatus and patient information acquired using ID card. It is possible to record patient information of about 10,000 patients and radiographic data of about 120,000 exposures. This system can be made up as a multi work station system using a local area network. (author).

  7. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  8. MASTR-MS: a web-based collaborative laboratory information management system (LIMS) for metabolomics.

    Science.gov (United States)

    Hunter, Adam; Dayalan, Saravanan; De Souza, David; Power, Brad; Lorrimar, Rodney; Szabo, Tamas; Nguyen, Thu; O'Callaghan, Sean; Hack, Jeremy; Pyke, James; Nahid, Amsha; Barrero, Roberto; Roessner, Ute; Likic, Vladimir; Tull, Dedreia; Bacic, Antony; McConville, Malcolm; Bellgard, Matthew

    2017-01-01

    An increasing number of research laboratories and core analytical facilities around the world are developing high throughput metabolomic analytical and data processing pipelines that are capable of handling hundreds to thousands of individual samples per year, often over multiple projects, collaborations and sample types. At present, there are no Laboratory Information Management Systems (LIMS) that are specifically tailored for metabolomics laboratories that are capable of tracking samples and associated metadata from the beginning to the end of an experiment, including data processing and archiving, and which are also suitable for use in large institutional core facilities or multi-laboratory consortia as well as single laboratory environments. Here we present MASTR-MS, a downloadable and installable LIMS solution that can be deployed either within a single laboratory or used to link workflows across a multisite network. It comprises a Node Management System that can be used to link and manage projects across one or multiple collaborating laboratories; a User Management System which defines different user groups and privileges of users; a Quote Management System where client quotes are managed; a Project Management System in which metadata is stored and all aspects of project management, including experimental setup, sample tracking and instrument analysis, are defined, and a Data Management System that allows the automatic capture and storage of raw and processed data from the analytical instruments to the LIMS. MASTR-MS is a comprehensive LIMS solution specifically designed for metabolomics. It captures the entire lifecycle of a sample starting from project and experiment design to sample analysis, data capture and storage. It acts as an electronic notebook, facilitating project management within a single laboratory or a multi-node collaborative environment. This software is being developed in close consultation with members of the metabolomics research

  9. Projecting technology change to improve space technology planning and systems management

    Science.gov (United States)

    Walk, Steven Robert

    2011-04-01

    Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.

  10. DISEASE MANAGEMENT INFORMATION SYSTEM

    OpenAIRE

    Bens Pardamean; Anindito; Anjela Djoeang; Nana Tobing

    2013-01-01

    The study designed an information system model for Disease Management (DisMan) that met the specifications and needs of a consumer electronics manufacturer. The diseases monitored by this study were diabetes, hypertension and tuberculosis. Data were collected through interviews with the companyâs human resources department and occupational health provider. As for the model, literature and online research were conducted to collect health standards and information system standards on existing D...

  11. eDOC : A collaboration infrastructure to manage knowledge and information on nuclear projects and research activities

    International Nuclear Information System (INIS)

    Van Craeynest, J.M.; Jacquemet, F.; Chermette, D.; Bonneau, S.

    2004-01-01

    One of EU's strategic goals was launched at Lisbon 2000 European summit: becoming the most competitive knowledge economy by 2010. In the field of nuclear technologies, we know that capitalizing knowledge and acquired experience is vital to preserve nuclear equipment's' safe use in the future. Knowledge Management encompasses various domains of business practices, relating to human resources management, information, information technologies, strategy, and accounting. Facing such complex issues, especially in R and D organizations, knowledge management cannot only stand on a few organizational or technical solutions. All functions must be involved to achieve those strategic objectives: management must find realistic incentives and inscribe Knowledge Management as a core management objective (just as Quality Insurance has been). Human Resources departments and education institutes can benefit from new technologies to improve training methods. Research units have to launch knowledge capitalization projects to retrieve, save and transfer critical knowledge, technical skills and know-how. An a-posteriori knowledge saving 'fireman-type' action must be done in the case of major events but we must promote an on-going capitalization effort as well and embed KM into projects and activities management methods. This effort during the project and afterwards is implemented through a perennial information system. This information system should provide a wide range of services for scientific publications and patents management, corporate or local knowledge bases and document repositories, project management and collaboration, rich media authoring, etc. Implementing virtual workspaces with eDOC Research and engineering activities are more and more cross-organizations funded and netlike organized. Furthermore, it is very difficult for project managers to deal with security constraints as they must share but protect knowledge as well. Before sharing information, teams have to share a

  12. CooMan - a global collaborative project management system

    International Nuclear Information System (INIS)

    Souza, J.M. de; Palma, S.

    1994-01-01

    Project Coordination and Management have long been recognized as an area with growing problems and unsatisfactory solutions. Conciliating flexibility with target achievements is historically the main problem to face. The difficulties have been growing at more than linear ratio with the size and complexity of the Projects being developed in the present days. The HEP communities suffer additional challenges because of the distributed nature of the collaborations, the novelty of each project; and the less authoritarian form of leadership and management of team and individual. This prevents the adoption of more centralized focus on decision. CooMan intends to be a Global Collaborative Project Management System. This paper discusses the basic aspects of the concepts involved, outlining how task coordination, acts of speech, and World-Wide hyper media can be used to support project management activities. A distributed tool to implement such proposition is described, and a first prototype is presented

  13. Application of systems engineering methods to the development of information resource management programs

    International Nuclear Information System (INIS)

    Hofer, R.W.

    1987-01-01

    The Civilian Radioactive Waste Management program has presented challenges to information professionals which have never been confronted before. This is the first major research program to require full public access to a vast range of scientific and engineering data. Estimated information system life cycle requirements commensurate with the repository's 10,000 year life are unprecedented, especially when compared with the needs of the commercial nuclear industry. The range of information system users and the differences in the ability of various classes of users to access sophisticated information resources has likewise never been approached in this area before. Consequently, application of previous experience associated with the commercial nuclear power industry information system design falls far short of meeting the information management and dissemination requirements of this program. This paper describes the overall information requirements governing the data and documents associated with the site characterization phase of the geologic repository program. It further outlines a design methodology for the development of an information resource management program which responds to these criteria, emphasizing the use of a systems engineering approach. The paper concludes with a projection of future requirements for information management associated with the geologic repository program and suggested approaches to planning for these needs

  14. MIMS - MEDICAL INFORMATION MANAGEMENT SYSTEM

    Science.gov (United States)

    Frankowski, J. W.

    1994-01-01

    MIMS, Medical Information Management System is an interactive, general purpose information storage and retrieval system. It was first designed to be used in medical data management, and can be used to handle all aspects of data related to patient care. Other areas of application for MIMS include: managing occupational safety data in the public and private sectors; handling judicial information where speed and accuracy are high priorities; systemizing purchasing and procurement systems; and analyzing organizational cost structures. Because of its free format design, MIMS can offer immediate assistance where manipulation of large data bases is required. File structures, data categories, field lengths and formats, including alphabetic and/or numeric, are all user defined. The user can quickly and efficiently extract, display, and analyze the data. Three means of extracting data are provided: certain short items of information, such as social security numbers, can be used to uniquely identify each record for quick access; records can be selected which match conditions defined by the user; and specific categories of data can be selected. Data may be displayed and analyzed in several ways which include: generating tabular information assembled from comparison of all the records on the system; generating statistical information on numeric data such as means, standard deviations and standard errors; and displaying formatted listings of output data. The MIMS program is written in Microsoft FORTRAN-77. It was designed to operate on IBM Personal Computers and compatibles running under PC or MS DOS 2.00 or higher. MIMS was developed in 1987.

  15. Approach to improve construction management utilizing information technology

    International Nuclear Information System (INIS)

    Lee, Woo Bang; Moon, Jin Yeong

    2003-01-01

    Korea Hydro and Nuclear Power (KHNP) has been managed Nuclear Power Plant (NPP) construction projects including basic project planning, design, procurement, construction and start-up for nearly 30 years, and taken the leading role in the self-reliance program for constructing NPP. To maintain its leading position of construction technology and export it to other countries, it is more likely required to build the strong and competitive business management system to improve internal business efficiency and transparency, and also to respond to the change of external business circumstances such as electricity market opening. KHNP is implementing Enterprise Resource Planning (ERP) System as a business innovation tool to improve business efficiency, which changes the way of performing work from organizational system to process-oriented system in order to optimize the company resources to achieve above goals. This change should be made based on the results of performing Business Process Re-engineering (BPR) to maximize overall business efficiency. For the construction project management area, the establishment of Integrated Construction Information Sharing System based on Information Technology (IT) is the most important part. It makes possible to build collaboration system with 'Win-Win strategy' between the project owner and all related entities and to contribute to secure transparency and cut the project cost down. We would like to introduce our NPP Construction Project Management System, Infrastructure for Information System, Information Sharing System among construction related entities and Implementation Practices in this paper and also include the suggestions on our customary practice and subject that should be improved

  16. Top Management Control Functions for Information Systems in Small and Medium Enterprises

    Directory of Open Access Journals (Sweden)

    Uma VIJAYAKUMAR

    2009-01-01

    Full Text Available This paper analyzes the Top Management Control functions for Information Systems (IS in Small and Medium Enterprises (SMEs. SMEs extensively rely on information technology resources to enhance their competence in today’s global economy. They should have adequate top management control mechanisms in place for their efficient functioning. Top Management Controls determine how effectively the senior management manages the IS functions in a SME. The major tasks at this level consist of Planning, Organizing, Leading and Controlling functions. A brief introduction to SMEs is given at the beginning followed by the different categories of Top Management Controls. The final section highlights on some good practices to be followed by Top Management to realize the vision for the IS project in SMEs.

  17. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  18. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  19. Information and Knowledge Management at South African Law Firms

    African Journals Online (AJOL)

    In legal practice, information management technologies, for example intranets, ... document and content management systems, case and project management ... knowledge management, law firms, legal practice, information technology, legal ...

  20. Project monitoring and evaluation: an enhancing method for health research system management.

    Science.gov (United States)

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  1. Information system for property management. Prestudy; Kiinteistoejohtamisen tietojaerjestelmae. Esitutkimus

    Energy Technology Data Exchange (ETDEWEB)

    Laurila, S.; Kiiras, J.

    2003-07-01

    The objective of this research is to study the types of management systems does property management company need for information management services. A management system should communicate with all kinds of information systems that are used by real estate owners. Within the management system real estate information should be processed into form of documents. Mainly, these documents are plans and reports that a property manager prepares for the owner in question. Property management is here seen as a strategic and operative management function of real estate ownership, facilities, maintenance and development. An outsourced property management is a specialized service provided for the real estate owner. Services offered by a property management company are strategic planning and implementation, management of operative work, and strategy realigning. Property management information consists of plans and reports that can be presented on three levels. The highest, strategic level concerns owner's real estate portfolio as a whole. The middle, business level consists of real estate business information over several years. The lowest, annual level concerns operative information on a yearly basis. The suggested management system is based on a data warehouse technique. Information sources of a data warehouse involve both internal, operative information systems of real estate owners and external information sources. The information needed for planning and reporting will be delivered to the data warehouse on demand. (orig.)

  2. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  3. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  4. Efficient, LON-based energy information management system; Effektives Energie-Informations-Management-System auf LON-Basis

    Energy Technology Data Exchange (ETDEWEB)

    Althaus, A.; Kalla, H. [Weidmueller GmbH, Paderborn (Germany)

    1999-08-01

    In these days of globalisation and increasing competition, intelligent concepts have become indispensable. The decentralized energy information management system offered by Weidmueller stores consumption data in a database that makes consumption transparent both to the utility and its customers. [Deutsch] Die Maerkte werden globaler, der Wettbewerb immer haerter. Wer hier als Energielieferant `im Rennen` bleiben will, muss intelligente, zukunftsweisende Konzepte zusammen mit seinen Kunden erarbeiten. Das dezentrale Energie-Informations-Management-System von Weidmueller erfasst dazu die Verbrauchsdaten, die wiederum die Datenbasis mit entsprechender Verbrauchstransparenz sowohl fuer den Energieversorger als auch fuer den Kunden bilden. (orig.)

  5. Training Requirements and Information Management System

    Energy Technology Data Exchange (ETDEWEB)

    Cillan, T.F.; Hodgson, M.A.

    1992-05-01

    This is the software user's guide for the Training Requirements and Information Management System. This guide defines and describes the software operating procedures as they apply to the end user of the software program. This guide is intended as a reference tool for the user who already has an indepth knowledge of the Training Requirements and Information Management System functions and data reporting requirement.

  6. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    Science.gov (United States)

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  7. 76 FR 42536 - Real-Time System Management Information Program

    Science.gov (United States)

    2011-07-19

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...

  8. 75 FR 68418 - Real-Time System Management Information Program

    Science.gov (United States)

    2010-11-08

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION...) to establish a Real-Time System Management Information Program that provides, in all States, the... traveler information. The purposes of the Real-Time System Management Information Program are to: (1...

  9. Natural resource management information systems: a guide to design

    Energy Technology Data Exchange (ETDEWEB)

    Tschanz, J.F.; Kennedy, A.S.

    1975-07-01

    Resource management requires the timely supply of intelligible, concise information to facilitate the variety of decisions needed. A distinctive component of information useful in resource management is its spatial content. The first portion of this guidebook sketches the resource management needs for spatial information, indicating not only the variety of resource management contexts, but also the variety of information/data handling approaches that exist. Within this diversity, common structural characteristics for all spatial information/data handling can be perceived, and the remainder of the guidebook outlines the general structure of a resource management information system and a process for designing such a system. Three basic elements of the information system are data base management, data retrieval and processing, and system support. Equally important are the interfaces through which the system is linked to its community of users, data supply, and available information system technology.

  10. Substance abuse treatment management information systems: balancing federal, state, and service provider needs.

    Science.gov (United States)

    Camp, J M; Krakow, M; McCarty, D; Argeriou, M

    1992-01-01

    There is increased interest in documenting the characteristics and treatment outcomes of clients served with Alcohol, Drug Abuse, and Mental Health Block Grant funds. The evolution of federal client-based management systems for substance abuse treatment services demonstrates that data collection systems are important but require continued support. A review of the Massachusetts substance abuse management information system illustrates the utility of a client-based data set. The development and implementation of a comprehensive information system require overcoming organizational barriers and project delays, fostering collaborative efforts among staff from diverse agencies, and employing considerable resources. In addition, the need to develop mechanisms for increasing the reliability of the data and ongoing training for the users is presented. Finally, three applications of the management information system's role in shaping policy are reviewed: developing services for special populations (communities of color, women, and pregnant substance abusers, and injection drug users), utilizing MIS data for evaluation purposes, and determining funding allocations.

  11. The development of an advanced information management system

    International Nuclear Information System (INIS)

    Kim, Seung Hwan

    2005-01-01

    Performing a PSA requires a lot of data to analyze, to evaluate the risk, to trace the process of results and to verify the results. KAERI is developing a PSA information database system, AIMS (Advanced Information Management System for PSA). The objective of AIMS development is to integrate and computerize all the distributed information of a PSA into a system and to enhance the accessibility to PSA information for all PSA related activities. We designed the PSA information database system for the following purposes: integrated PSA information management software, sensitivity analysis, quality assurance, anchor to another reliability database. The AIMS consists of a PSA Information database, Information browsing (searching) modules, and PSA automatic quantification manager modules

  12. The development of an advanced information management system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Seung Hwan [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    2005-07-01

    Performing a PSA requires a lot of data to analyze, to evaluate the risk, to trace the process of results and to verify the results. KAERI is developing a PSA information database system, AIMS (Advanced Information Management System for PSA). The objective of AIMS development is to integrate and computerize all the distributed information of a PSA into a system and to enhance the accessibility to PSA information for all PSA related activities. We designed the PSA information database system for the following purposes: integrated PSA information management software, sensitivity analysis, quality assurance, anchor to another reliability database. The AIMS consists of a PSA Information database, Information browsing (searching) modules, and PSA automatic quantification manager modules.

  13. Assessment of laboratory logistics management information system ...

    African Journals Online (AJOL)

    Introduction: Logistics management information system for health commodities remained poorly implemented in most of developing countries. To assess the status of laboratory logistics management information system for HIV/AIDS and tuberculosis laboratory commodities in public health facilities in Addis Ababa. Methods: ...

  14. DEVELOPMENT OF A METADATA MANAGEMENT SYSTEM FOR AN INTERDISCIPLINARY RESEARCH PROJECT

    Directory of Open Access Journals (Sweden)

    C. Curdt

    2012-07-01

    Full Text Available In every interdisciplinary, long-term research project it is essential to manage and archive all heterogeneous research data, produced by the project participants during the project funding. This has to include sustainable storage, description with metadata, easy and secure provision, back up, and visualisation of all data. To ensure the accurate description of all project data with corresponding metadata, the design and implementation of a metadata management system is a significant duty. Thus, the sustainable use and search of all research results during and after the end of the project is particularly dependent on the implementation of a metadata management system. Therefore, this paper will describe the practical experiences gained during the development of a scientific research data management system (called the TR32DB including the corresponding metadata management system for the multidisciplinary research project Transregional Collaborative Research Centre 32 (CRC/TR32 'Patterns in Soil-Vegetation-Atmosphere Systems'. The entire system was developed according to the requirements of the funding agency, the user and project requirements, as well as according to recent standards and principles. The TR32DB is basically a combination of data storage, database, and web-interface. The metadata management system was designed, realized, and implemented to describe and access all project data via accurate metadata. Since the quantity and sort of descriptive metadata depends on the kind of data, a user-friendly multi-level approach was chosen to cover these requirements. Thus, the self-developed CRC/TR32 metadata framework is designed. It is a combination of general, CRC/TR32 specific, as well as data type specific properties.

  15. The importance of management information systems in a managed care environment.

    Science.gov (United States)

    Porro, M R; Brill, K R

    1995-06-01

    Keys to successful information systems for home care providers are planning and control. With managed care's emphasis on data, agencies need to have information systems that can handle the demands managed care puts on agencies today--planning before hurrying to install a system will ensure control as the managed care contracts add up.

  16. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  17. A state-of-the-art production information management system: Conception to completion

    International Nuclear Information System (INIS)

    Parker, A.R.; Corston, S.P.; Abdallah, F.F.

    1994-01-01

    The task of hydrocarbon production accounting for oil and gas development projects can be extremely complex and time consuming, especially if Joint Venture Partner (JVP) ownership varies over several inter-related producing projects. For this task to be carried out quickly and accurately a diverse range of computer software and hardware is usually employed. This paper explains the planning, specifications and construction of an online Management Information System for hydrocarbon production balancing, reconciliation and reporting over the North West Shelf Gas Project

  18. A state-of-the-art production information management system: Conception to completion

    Energy Technology Data Exchange (ETDEWEB)

    Parker, A.R.; Corston, S.P.; Abdallah, F.F.

    1994-12-31

    The task of hydrocarbon production accounting for oil and gas development projects can be extremely complex and time consuming, especially if Joint Venture Partner (JVP) ownership varies over several inter-related producing projects. For this task to be carried out quickly and accurately a diverse range of computer software and hardware is usually employed. This paper explains the planning, specifications and construction of an online Management Information System for hydrocarbon production balancing, reconciliation and reporting over the North West Shelf Gas Project.

  19. Information Technology Management

    OpenAIRE

    Patru Catalin; Petrache Alina

    2011-01-01

    Most of the Information technology management programs are designed to educate and develop managers who can effectively manage the planning, design, selection, implementation, use, and administration of emerging and converging information and communications technologies. The IT Manager and the Project Manager are not at odds. The Project Manager’s ability to focus knowledge, skills, tools and techniques on the temporary endeavor frees the IT Manager to focus on keeping the wheels of commerce ...

  20. Information Management System Supporting a Multiple Property Survey Program with Legacy Radioactive Contamination.

    Science.gov (United States)

    Stager, Ron; Chambers, Douglas; Wiatzka, Gerd; Dupre, Monica; Callough, Micah; Benson, John; Santiago, Erwin; van Veen, Walter

    2017-04-01

    The Port Hope Area Initiative is a project mandated and funded by the Government of Canada to remediate properties with legacy low-level radioactive waste contamination in the Town of Port Hope, Ontario. The management and use of large amounts of data from surveys of some 4800 properties is a significant task critical to the success of the project. A large amount of information is generated through the surveys, including scheduling individual field visits to the properties, capture of field data laboratory sample tracking, QA/QC, property report generation and project management reporting. Web-mapping tools were used to track and display temporal progress of various tasks and facilitated consideration of spatial associations of contamination levels. The IM system facilitated the management and integrity of the large amounts of information collected, evaluation of spatial associations, automated report reproduction and consistent application and traceable execution for this project.x. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  1. Thermal management of closed computer modules utilizing high density circuitry. [in Airborne Information Management System

    Science.gov (United States)

    Hoadley, A. W.; Porter, A. J.

    1990-01-01

    This paper presents data on a preliminary analysis of the thermal dynamic characteristics of the Airborne Information Management System (AIMS), which is a continuing design project at NASA Dryden. The analysis established the methods which will be applied to the actual AIMS boards as they become available. The paper also describes the AIMS liquid cooling system design and presents a thermodynamic computer model of the AIMS cooling system, together with an experimental validation of this model.

  2. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  3. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  4. Information management systems improve advanced plant design

    International Nuclear Information System (INIS)

    Turk, R.S.; Serafin, S.A.; Leckley, J.B.

    1994-01-01

    Computer-aided engineering tools are proving invaluable in both the design and operation of nuclear power plants. ABB Combustion Engineering's Advanced Light Water Reactor (ALWR) features a computerized Information Management System (IMS) as an integral part of the design. The System 80+IMS represents the most powerful information management tool for Nuclear Power Plants commercially available today. Developed by Duke Power Company specifically for use by nuclear power plant owner operators, the IMS consists of appropriate hardware and software to manage and control information flow for all plant related work or tasks in a systematic, consistent, coordinated and informative manner. A significant feature of this IMS is that it is primarily based on plant data. The principal design tool, PASCE (Plant Application and Systems from Combustion Engineering), is comprised of intelligent databases that describe the design and from which accurate plant drawings are created. Additionally the IMS includes, at its hub, a relational database management system and an associated document management system. The data-based approach and applications associated with the IMS were developed, and have proven highly effective, for plant modifications, configuration management, and operations and maintenance applications at Duke Power Company's operating nuclear plants. This paper presents its major features and benefits. 4 refs

  5. Request-Centric Wireless Bus Information Management System

    Directory of Open Access Journals (Sweden)

    Ying-Chih Chen

    2016-11-01

    Full Text Available This invention relates to a wireless bus information management system, which includes bus stop and vehicle management subsystems. The management signals are transmittable between bus stops and the vehicle. Based on vehicle management signals, the bus stop management subsystem can obtain information about the bus route identification, the number of unoccupied seats, the intention to stop or not, etc. Similarly, with the bus stop management signals, the vehicle management subsystem can make the decision of stopping. Accordingly, when a passenger wants to get off the vehicle or there are unoccupied seats, the vehicle management subsystem will inform the bus stop management subsystem such that the passengers waiting at the bus stop may flexibly schedule their travel plan. The proposed distributed wireless system is detailed by a prototype implementation and a simulation analysis, which is shown to be feasible and scalable.

  6. Defining an Inteligent Information System for Monitoring and Verification of Energy Management in Cities

    International Nuclear Information System (INIS)

    Tomsic, Z.; Gasic, I.; Lugaric, L.; Cacic, G.

    2011-01-01

    Improving the efficiency of energy consumption (EC) is a central theme of any energy policy. Improved energy efficiency (EE) meets three energy policy goals: security of supply, competitiveness and protection of the environment. Systematic energy management is a body of knowledge and skills based on an organizational structure that links people with assigned responsibilities, efficiency monitoring procedures and continuous measurement and improvement of energy efficiency. This body of knowledge must be supported by appropriate ICT for gathering, processing and disseminating data on EC, EE targets and information. Energy Management Information System - EMIS is a web application for monitoring and analysis of energy and water consumption in public buildings and represents inevitable tool for systematic energy management. EMIS software tool connects processes of gathering data on buildings and their energy consumption, monitoring consumption indicators, setting energy efficiency targets and reporting energy and water consumption savings. Project Intelligent Information System for Monitoring and Verification of Energy Management in Cities (ISEMIC) will distribute EMIS software tool in region (BiH, Slovenia and Serbia). This project also has a goal of improving a software system for utilizing EC measurements, both from smart meters and traditional measurement devices and subsequent data processing and analysis to facilitate, upgrade and eventually replace the currently used energy management system for public buildings in Croatia. ISEMIC will enable use of smart meters within an energy management for the first time in BiH, Slovenia and Serbia, along with an analytical part which enables intelligent estimation of energy consumption based on multiple criteria. EMIS/ISEMIC will enable: Continuous updating and maintenance of a database of information on buildings; Continuous entry and monitoring of consumption data for all energents and water in buildings; Calculation of

  7. Management Information System Based on the Balanced Scorecard

    Science.gov (United States)

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  8. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  9. Information Management for a Large Multidisciplinary Project

    Science.gov (United States)

    Jones, Kennie H.; Randall, Donald P.; Cronin, Catherine K.

    1992-01-01

    In 1989, NASA's Langley Research Center (LaRC) initiated the High-Speed Airframe Integration Research (HiSAIR) Program to develop and demonstrate an integrated environment for high-speed aircraft design using advanced multidisciplinary analysis and optimization procedures. The major goals of this program were to evolve the interactions among disciplines and promote sharing of information, to provide a timely exchange of information among aeronautical disciplines, and to increase the awareness of the effects each discipline has upon other disciplines. LaRC historically has emphasized the advancement of analysis techniques. HiSAIR was founded to synthesize these advanced methods into a multidisciplinary design process emphasizing information feedback among disciplines and optimization. Crucial to the development of such an environment are the definition of the required data exchanges and the methodology for both recording the information and providing the exchanges in a timely manner. These requirements demand extensive use of data management techniques, graphic visualization, and interactive computing. HiSAIR represents the first attempt at LaRC to promote interdisciplinary information exchange on a large scale using advanced data management methodologies combined with state-of-the-art, scientific visualization techniques on graphics workstations in a distributed computing environment. The subject of this paper is the development of the data management system for HiSAIR.

  10. Sequencing Information Management System (SIMS). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Fields, C.

    1996-02-15

    A feasibility study to develop a requirements analysis and functional specification for a data management system for large-scale DNA sequencing laboratories resulted in a functional specification for a Sequencing Information Management System (SIMS). This document reports the results of this feasibility study, and includes a functional specification for a SIMS relational schema. The SIMS is an integrated information management system that supports data acquisition, management, analysis, and distribution for DNA sequencing laboratories. The SIMS provides ad hoc query access to information on the sequencing process and its results, and partially automates the transfer of data between laboratory instruments, analysis programs, technical personnel, and managers. The SIMS user interfaces are designed for use by laboratory technicians, laboratory managers, and scientists. The SIMS is designed to run in a heterogeneous, multiplatform environment in a client/server mode. The SIMS communicates with external computational and data resources via the internet.

  11. Public Management Information Systems: Theory and Prescription.

    Science.gov (United States)

    Bozeman, Barry; Bretschneider, Stuart

    1986-01-01

    The existing theoretical framework for research in management information systems (MIS) is criticized for its lack of attention to the external environment of organizations, and a new framework is developed which better accommodates MIS in public organizations: public management information systems. Four models of publicness that reflect external…

  12. The Influence Of Organizational Culture On Management Information System

    Directory of Open Access Journals (Sweden)

    Arlis Dewi Kuraesin

    2017-03-01

    Full Text Available This article aims to know the culture of the organization and management accounting information system based on existing theories. The management information system is a collection of sub-systems which are interconnected with each other to work together in harmony to achieve one goal of process data into information needed by management in decision making. An important factor influencing the use of information systems is Cultural Organization. Management Information system success is influenced by several factors one of which is the organizations culture. Organizational culture has a very strong influence on the overall organizational and individual behavior due to the information system is a major component of the organization are influenced substantially by organizational culture.

  13. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  14. A survey of the use of database management systems in accelerator projects

    OpenAIRE

    Poole, John; Strubin, Pierre M

    1995-01-01

    The International Accelerator Database Group (IADBG) was set up in 1994 to bring together the people who are working with databases in accelerator laboratories so that they can exchange information and experience. The group now has members from more than 20 institutes from all around the world, representing nearly double this number of projects. This paper is based on the information gathered by the IADBG and describes why commercial DataBase Management Systems (DBMS) are being used in accele...

  15. Plant risk status information management system

    International Nuclear Information System (INIS)

    Campbell, D.J.; Ellison, B.C.; Glynn, J.C.; Flanagan, G.F.

    1985-01-01

    The Plant Risk Status Information Management System (PRISIMS) is a PC program that presents information about a nuclear power plant's design, its operation, its technical specifications, and the results of the plant's probabilistic risk assessment (PRA) in a logically and easily accessible format. PRISIMS provides its user with unique information for integrating safety concerns into day-to-day operational decisions and/or long-range management planning

  16. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  17. A laboratory information management system for DNA barcoding workflows.

    Science.gov (United States)

    Vu, Thuy Duong; Eberhardt, Ursula; Szöke, Szániszló; Groenewald, Marizeth; Robert, Vincent

    2012-07-01

    This paper presents a laboratory information management system for DNA sequences (LIMS) created and based on the needs of a DNA barcoding project at the CBS-KNAW Fungal Biodiversity Centre (Utrecht, the Netherlands). DNA barcoding is a global initiative for species identification through simple DNA sequence markers. We aim at generating barcode data for all strains (or specimens) included in the collection (currently ca. 80 k). The LIMS has been developed to better manage large amounts of sequence data and to keep track of the whole experimental procedure. The system has allowed us to classify strains more efficiently as the quality of sequence data has improved, and as a result, up-to-date taxonomic names have been given to strains and more accurate correlation analyses have been carried out.

  18. Supporting data and calculations for the NNWSI [Nevada Nuclear Waste Storage Investigations] project information management system concepts evaluation report

    International Nuclear Information System (INIS)

    1986-12-01

    This report presents the supporting data and calculations that provided the basis for the NNWSI Project Information Management System Concepts Evaluation Report. Project documentation estimates for numbers of documents and pages are presented for all nine Project participants. These estimates cover the time period from 1980 to 1990. In addition, the report presents a calculational method for estimating document and page volumes beyond the year 1990. Electronic character code and bit-mapped image storage requirements associated with the page volumes are also shown and the calculational method described. Six conceptual system approaches capable of satisfying NNWSI Project requirements are defined and described. These approaches include: fully centralized microfilm system based on computer-assisted retrieval (CAR) (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical disk system based on electronic image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). All assumptions associated with these approaches are given. Data sheets in an appendix describe the capital equipment and labor components that were used as the basis of the cost evaluation. Definitions of two cost scenarios cover: (1) processing of all documents and pages and (2) processing of 10% of the total documents and 30% of the total pages. Capital equipment, labor, and summary cost tables for the years from 1987 through 1991 are presented for both scenarios. The report also describes a case for starting system operations in 1988 instead of 1987 and complete cost tables for the 1988 start-up case are given. 1 ref

  19. PACS project management utilizing web-based tools

    Science.gov (United States)

    Patel, Sunil; Levin, Brad; Gac, Robert J., Jr.; Harding, Douglas, Jr.; Chacko, Anna K.; Radvany, Martin; Romlein, John R.

    2000-05-01

    As Picture Archiving and Communications Systems (PACS) implementations become more widespread, the management of deploying large, multi-facility PACS will become a more frequent occurrence. The tools and usability of the World Wide Web to disseminate project management information obviates time, distance, participant availability, and data format constraints, allowing for the effective collection and dissemination of PACS planning, implementation information, for a potentially limitless number of concurrent PACS sites. This paper will speak to tools, such as (1) a topic specific discussion board, (2) a 'restricted' Intranet, within a 'project' Intranet. We will also discuss project specific methods currently in use in a leading edge, regional PACS implementation concerning the sharing of project schedules, physical drawings, images of implementations, site-specific data, point of contacts lists, project milestones, and a general project overview. The individual benefits realized for the end user from each tool will also be covered. These details will be presented, balanced with a spotlight on communication as a critical component of any project management undertaking. Using today's technology, the web arguably provides the most cost and resource effective vehicle to facilitate the broad based, interactive sharing of project information.

  20. Information management for enabling systems medicine

    Directory of Open Access Journals (Sweden)

    Ganzinger Matthias

    2017-09-01

    Full Text Available Systems medicine is a data-oriented approach in research and clinical practice to support study and treatment of complex diseases. It relies on well-defined information management processes providing comprehensive and up to date information as basis for electronic decision support. The authors suggest a three-layer information technology (IT architecture for systems medicine and a cyclic data management approach including a knowledge base that is dynamically updated by extract, transform, and load (ETL procedures. Decision support is suggested as case-based and rule-based components. Results are presented via a user interface to acknowledging clinical requirements in terms of time and complexity. The systems medicine application was implemented as a prototype.

  1. Research on Design Information Management System for Leather Goods

    Science.gov (United States)

    Lu, Lei; Peng, Wen-li

    The idea of setting up a design information management system of leather goods was put forward to solve the problems existed in current information management of leather goods. Working principles of the design information management system for leather goods were analyzed in detail. Firstly, the acquiring approach of design information of leather goods was introduced. Secondly, the processing methods of design information were introduced. Thirdly, the management of design information in database was studied. Finally, the application of the system was discussed by taking the shoes products as an example.

  2. Knowledge-based system for flight information management. Thesis

    Science.gov (United States)

    Ricks, Wendell R.

    1990-01-01

    The use of knowledge-based system (KBS) architectures to manage information on the primary flight display (PFD) of commercial aircraft is described. The PFD information management strategy used tailored the information on the PFD to the tasks the pilot performed. The KBS design and implementation of the task-tailored PFD information management application is described. The knowledge acquisition and subsequent system design of a flight-phase-detection KBS is also described. The flight-phase output of this KBS was used as input to the task-tailored PFD information management KBS. The implementation and integration of this KBS with existing aircraft systems and the other KBS is described. The flight tests are examined of both KBS's, collectively called the Task-Tailored Flight Information Manager (TTFIM), which verified their implementation and integration, and validated the software engineering advantages of the KBS approach in an operational environment.

  3. Analysis and design on airport safety information management system

    Directory of Open Access Journals (Sweden)

    Yan Lin

    2017-01-01

    Full Text Available Airport safety information management system is the foundation of implementing safety operation, risk control, safety performance monitor, and safety management decision for the airport. The paper puts forward the architecture of airport safety information management system based on B/S model, focuses on safety information processing flow, designs the functional modules and proposes the supporting conditions for system operation. The system construction is helpful to perfecting the long effect mechanism driven by safety information, continually increasing airport safety management level and control proficiency.

  4. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  5. Managing projects in a digital government | Onyemaobi | Journal of ...

    African Journals Online (AJOL)

    The process of developing a new system in a Digital Government is a kind of planned ... management ensures the application of information technology knowledge, ... Keywords: Digital Government, System Development, Project Management, ...

  6. IT Project Management from a Systems Thinking Perspective: A Position Paper

    NARCIS (Netherlands)

    van Eck, Pascal; Ponisio, Laura

    2008-01-01

    We proposes a Systems Thinking approach to the study of IT project management and show how this approach helps project managers in controlling their projects. To illustrate our proposal, we present an example model of the dynamics of IT out-sourcing projects. The example model explains these

  7. Neural neworks in a management information systems

    Directory of Open Access Journals (Sweden)

    Jana Weinlichová

    2009-01-01

    Full Text Available For having retrospection for all over the data which are used, analyzed, evaluated and for a future incident predictions are used Management Information Systems and Business Intelligence. In case of not to be able to apply standard methods of data processing there can be with benefit applied an Artificial Intelligence. In this article will be referred to proofed abilities of Neural Networks. The Neural Networks is supported by many software products related to provide effective solution of manager issues. Those products are given as primary support for manager issues solving. We were tried to find reciprocally between products using Neural Networks and between Management Information Systems for finding a real possibility of applying Neural Networks as a direct part of Management Information Systems (MIS. In the article are presented possibilities to apply Neural Networks on different types of tasks in MIS.

  8. Anesthesia information management systems

    OpenAIRE

    Feri Štivan; Janez Benedik; Tomaž Lužar

    2014-01-01

    Introduction: The use of anesthesia information management systems (AIMS) is on the increase. This is particularly true for academic anesthesia departments. The main reasons for slow adoption of these systems in the past are financial barriers associated with implementation of these systems and their not so traditionally obvious potential to improve patient care. In addition, a major obstacle to acceptance of this technology is the concern of users over the impact of the electronic anesthesia...

  9. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  10. EUnetHTA information management system: development and lessons learned.

    Science.gov (United States)

    Chalon, Patrice X; Kraemer, Peter

    2014-11-01

    The aim of this study was to describe the techniques used in achieving consensus on common standards to be implemented in the EUnetHTA Information Management System (IMS); and to describe how interoperability between tools was explored. Three face to face meetings were organized to identify and agree on common standards to the development of online tools. Two tools were created to demonstrate the added value of implementing interoperability standards at local levels. Developers of tools outside EUnetHTA were identified and contacted. Four common standards have been agreed on by consensus; and consequently all EUnetHTA tools have been modified or designed accordingly. RDF Site Summary (RSS) has demonstrated a good potential to support rapid dissemination of HTA information. Contacts outside EUnetHTA resulted in direct collaboration (HTA glossary, HTAi Vortal), evaluation of options for interoperability between tools (CRD HTA database) or a formal framework to prepare cooperation on concrete projects (INAHTA projects database). While being entitled a project on IT infrastructure, the work program was also about people. When having to agree on complex topics, fostering a cohesive group dynamic and hosting face to face meetings brings added value and enhances understanding between partners. The adoption of widespread standards enhanced the homogeneity of the EUnetHTA tools and should thus contribute to their wider use, therefore, to the general objective of EUnetHTA. The initiatives on interoperability of systems need to be developed further to support a general interoperable information system that could benefit the whole HTA community.

  11. DEVELOPMENT OF A CARBON MANAGEMENT GEOGRAPHIC INFORMATION SYSTEM (GIS) FOR THE UNITED STATES

    Energy Technology Data Exchange (ETDEWEB)

    Howard J. Herzog

    2004-03-01

    The Lab for Energy and Environment (LFEE) at MIT is developing a Geographic Information System (GIS) for carbon management. The GIS will store, integrate, and manipulate information relating to the components of carbon management systems. Additionally, the GIS can be used to interpret and analyze the effect of developing these systems. In the first year of this three year project, we focused on two tasks: (1) specifying the system design--defining in detail the GIS data requirements, the types of analyses that can be conducted, and the forms of output we will produce, as well as designing the computer architecture of the GIS and (2) creating the ''core'' datasets--identifying data sources and converting them into a form accessible by the GIS.

  12. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  13. Introduction to Management Information system

    OpenAIRE

    Mishra, Umakant

    2013-01-01

    A Management Information System (MIS) is a systematic organization and presentation of information that is generally required by the management of an organization for taking better decisions for the organization. The MIS data may be derived from various units of the organization or from other sources. However it is very difficult to say the exact structure of MIS as the structure and goals of different types of organizations are different. Hence both the data and structure of MIS is dependent...

  14. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  15. Information management

    Science.gov (United States)

    Ricks, Wendell; Corker, Kevin

    1990-01-01

    Primary Flight Display (PFD) information management and cockpit display of information management research is presented in viewgraph form. The information management problem in the cockpit, information management burdens, the key characteristics of an information manager, the interface management system handling the flow of information and the dialogs between the system and the pilot, and overall system architecture are covered.

  16. Perceptions of project managers regarding communication failures and barriers

    Directory of Open Access Journals (Sweden)

    Marilyn de Souza Cyganczuk

    2018-03-01

    Full Text Available The management of communication within a project can be considered as important as any other system within an organization because communication transmits and connects ideas, concepts, experiences and information on a project. This article describes an investigation of the problems in communication encountered by project managers in companies of different sizes and sectors in the project management area and compares these problems with what is found in the literature. Based on the study conducted, it was possible to identify the main barriers and failures in communication in these organizations and compare them with what is in the literature. The results showed that the main barriers and flaws found are: the lack of feedback to the members of the project team, the lack of trust among team members, channeling of misleading and distorted information, the lack of transmission of information or its transmission at an inopportune moment, and the limited knowledge and competencies of project managers, representing poor leadership and consequently impacting communication.

  17. Computerized map-based information management system for natural resource management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, K.

    1995-12-01

    Federal agencies, states and resource managers have control and stewardship responsibility over a significant inventory of natural resources. A number of federal regulations require the review, protection and preservation of natural resource protection. Examples of such actions include the reauthorization of the Clean Water Act and the modification of the National Contingency Plan to incorporate the requirements of the Oil Pollution Act of 1990. To successfully preserve conserve and restore natural resources on federal reservations, and state and private lands, and to comply with Federal regulations designed to protect natural resources located on their sites, and the type of information on these resources required by environmental regulations. This paper presents an approach using a computerized, graphical information management system to catalogue and track data for the management of natural resources under Federal and state regulations, and for promoting resource conservation, preservation and restoration. The system is designed for use by Federal facility resource managers both for the day-to-day management of resources under their control, and for the longer-term management of larger initiatives, including restoration of significant or endangered resources, participation in regional stewardship efforts, and general ecosystem management. The system will be valuable for conducting natural resource baseline inventories an implementing resource management plans on lands other than those controlled by the Federal government as well. The system can provide a method for coordinating the type of natural resource information required by major federal environmental regulations--thereby providing a cost-effective means for managing natural resource information.

  18. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  19. The Human Genome Project: Information access, management, and regulation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    McInerney, J.D.; Micikas, L.B.

    1996-08-31

    The Human Genome Project is a large, internationally coordinated effort in biological research directed at creating a detailed map of human DNA. This report describes the access of information, management, and regulation of the project. The project led to the development of an instructional module titled The Human Genome Project: Biology, Computers, and Privacy, designed for use in high school biology classes. The module consists of print materials and both Macintosh and Windows versions of related computer software-Appendix A contains a copy of the print materials and discs containing the two versions of the software.

  20. Master's Degree in Management Information Systems with a Supply Chain Management Focus

    Science.gov (United States)

    Ramaswamy, Kizhanatham V.; Boyd, Joseph L.; Desai, Mayur

    2007-01-01

    A graduate curriculum in Management Information Systems with a Supply Chain Management focus is presented. The motivation for this endeavor stems from the fact that the global scope of modern business organizations and the competitive environment in which they operate, requires an information system leveraged supply chain management system (SCM)…

  1. Migrating the facility profile information management system into the world wide web

    Energy Technology Data Exchange (ETDEWEB)

    Kero, R.E.; Swietlik, C.E.

    1994-09-01

    The Department of Energy - Office of Special Projects and Argonne National Laboratory (ANL), along with the Department of Energy - office of Scientific and Technical Information have previously designed and implemented the Environment, Safety and Health Facility Profile Information Management System (FPIMS) to facilitate greater efficiency in searching, analyzing and disseminating information found within environment, safety and health oversight documents. This information retrieval based system serves as a central repository for full-text electronic oversight documents, as well as a management planning and decision making tool that can assist in trend and root cause analyses. Continuous improvement of environment, safety and health programs are currently aided through this personal computer-based system by providing a means for the open communication of lessons learned across the department. Overall benefits have included reductions in costs and improvements in past information management capabilities. Access to the FPIMS has been possible historically through a headquarters-based local area network equipped with modems. Continued demand for greater accessibility of the system by remote DOE field offices and sites, in conjunction with the Secretary of Energy` s call for greater public accessibility to Department of Energy (DOE) information resources, has been the impetus to expand access through the use of Internet technologies. Therefore, the following paper will discuss reasons for migrating the FPIMS system into the World Wide Web (Web), various lessons learned from the FPIMS migration effort, as well as future plans for enhancing the Web-based FPIMS.

  2. An Evaluation of the Management Information System and Technology in Hospitals (GESITI/Hospitals

    Directory of Open Access Journals (Sweden)

    Antonio José Balloni

    2017-02-01

    Full Text Available The research project "Management of System and Information Technology in Hospitals" (GESITI/Hospitals has the purpose of mapping out the management of Information Systems (IS and Information Technology (IT in hospitals. By applying a multifocal prospective questionnaire in hospitals, the research aims to identify the hospitals need and demand, prospecting for unfolding, and generate a public integrated research report for supporting public and/or private decisions-makings. The ultimate result from this GESITI/Health research project should be a significant improvement on the hospital management and on the decisions-makings, which must reflect on peoples more satisfied regarding a better health care. Therefore, this paper aims to publish the main ideas of the GESITI/Health project i.e., its "Methodology & original Prospective Questionnaire (PQ". The methodology used is the Interpretative (or Introspective. About the PQ, we do not known, up to this date, who have developed a multifocal broad field tool -the PQ-, aiming wide hospitals management-. From 2010-16 the "methodology and PQ" have been implemented by about forty -40- universities -and increasing-, from Brazil and Abroad and, forty local research reports were generated. A book, published by the Brazilian Minister of Health [1], presents the results of a pilot project carried out by nineteen -19- out of these forty -40- universities, to know: sixteen Brazilian, one Mexican, one Argentina, one from Slovakia and one from Portugal. The chapter 25 of this book [1.A] presents an integrated research from all nineteen chapters -an integrated research report-. Finally, in the oral presentation, we will briefly present the "Methodology and the PQ" presented in this paper and, also, we will present an integrated comparative analyzes -main results got with the field application of the PQ- regarding the case studies accomplished by the universities from Brazil and Abroad.

  3. Waste Information Management System-2012 - 12114

    Energy Technology Data Exchange (ETDEWEB)

    Upadhyay, H.; Quintero, W.; Shoffner, P.; Lagos, L.; Roelant, D. [Applied Research Center, Florida International University, 10555 West Flagler Street, Suite 2100, Miami, FL 33174 (United States)

    2012-07-01

    The Waste Information Management System (WIMS) -2012 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. It has

  4. Information Systems and Management Training.

    Science.gov (United States)

    Curry, B.; Smith, D. G.

    1991-01-01

    A case study of a South Wales manufacturer illustrates the need for companies to adopt an integrated strategy for computerization and information systems. Lack of management training blending computing and business skills can have a crippling effect on system development and organizational health. (SK)

  5. Incident Management in Academic Information System using ITIL Framework

    Science.gov (United States)

    Palilingan, V. R.; Batmetan, J. R.

    2018-02-01

    Incident management is very important in order to ensure the continuity of a system. Information systems require incident management to ensure information systems can provide maximum service according to the service provided. Many of the problems that arise in academic information systems come from incidents that are not properly handled. The objective of this study aims to find the appropriate way of incident management. The incident can be managed so it will not be a big problem. This research uses the ITIL framework to solve incident problems. The technique used in this study is a technique adopted and developed from the service operations section of the ITIL framework. The results of this research found that 84.5% of incidents appearing in academic information systems can be handled quickly and appropriately. 15.5% incidents can be escalated so as to not cause any new problems. The model of incident management applied to make academic information system can run quickly in providing academic service in a good and efficient. The incident management model implemented in this research is able to manage resources appropriately so as to quickly and easily manage incidents.

  6. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  7. Student Perceptions in Teaching Principles of Management Information Systems

    Science.gov (United States)

    Rob, Mohammad A.; Etnyre, Vance

    2015-01-01

    Teaching concepts of information systems to general business students through a course such as management information systems (MIS) can be challenging in today's fast-changing environment of information technology (IT). Such a course must provide not only an understanding of the development, applications, and management of information systems, but…

  8. A System for Information Management in BioMedical Studies—SIMBioMS

    Science.gov (United States)

    Krestyaninova, Maria; Zarins, Andris; Viksna, Juris; Kurbatova, Natalja; Rucevskis, Peteris; Neogi, Sudeshna Guha; Gostev, Mike; Perheentupa, Teemu; Knuuttila, Juha; Barrett, Amy; Lappalainen, Ilkka; Rung, Johan; Podnieks, Karlis; Sarkans, Ugis; McCarthy, Mark I; Brazma, Alvis

    2009-01-01

    Summary: SIMBioMS is a web-based open source software system for managing data and information in biomedical studies. It provides a solution for the collection, storage, management and retrieval of information about research subjects and biomedical samples, as well as experimental data obtained using a range of high-throughput technologies, including gene expression, genotyping, proteomics and metabonomics. The system can easily be customized and has proven to be successful in several large-scale multi-site collaborative projects. It is compatible with emerging functional genomics data standards and provides data import and export in accepted standard formats. Protocols for transferring data to durable archives at the European Bioinformatics Institute have been implemented. Availability: The source code, documentation and initialization scripts are available at http://simbioms.org. Contact: support@simbioms.org; mariak@ebi.ac.uk PMID:19633095

  9. Study of system safety evaluation on LTO of national project. NISA safety research project on system safety of nuclear power plants

    International Nuclear Information System (INIS)

    Takizawa, Masayuki; Sekimura, Naoto; Miyano, Hiroshi; Aoyama, Katsunobu

    2012-01-01

    Japanese safety regulatory body, that is, Nuclear and Industrial Safety Agency (NISA) started a 5-year national safety research project as 'the first stage' from 2006 FY to 2010 FY whose objective is 'Improve the technical information basis in order to utilize knowledge as well as information related to ageing management and maintenance of NPPs. Fukushima disaster happened in March 2011, and the priority of research needs for ageing management dramatically changed in Japan. The second-stage national project started in October 2011 with the concept of 'system safety' of NNPs where not only ageing management on degradation phenomena of important components but also safety management on total plant systems are paid attention to. The second-stage project is so called 'Japanese Ageing Management Program for System Safety (JAMPSS)'. (author)

  10. The Fire Effects Information System - serving managers since before the Yellowstone fires

    Science.gov (United States)

    Jane Kapler Smith; Janet L. Fryer; Kristin Zouhar

    2009-01-01

    This presentation will describe the current status of the Fire Effects Information System (FEIS) and explore lessons learned from this 23-yearold project about the application of science to fire management issues. FEIS contains literature reviews covering biology and fire ecology for approximately 1,100 species in North America: plants and animals, native and nonnative...

  11. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  12. Management information systems

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This contract was for the development of a new range of colliery information computer systems (CIS) using a VAX 11/730 computer. The report details the selection of the system and the set-up of the hardware and software. The first application of these systems was to monitor production and delays from longwall faces. A trial installation was implemented at Shirebrook Colliery and this proved so successful that British Coal are now installing many similar systems. The key features of the production monitoring application are that delays are automatically detected in real time and the operator is prompted for the root cause of the delay. This is done through a linked series of questions and answere from a linked set of possible delay causes. Ad hoc and regular reports are produced giving local colliery management visibility of coal face performance, thus enabling informed decisions and corrective action to be taken. Following the successful application to production monitoring, the system was extended to heading/drivages, coal clearance/conveyors, mine air environment and fixed plant. Those applications were operational during the contract but have since been extended.

  13. Knowledge-based geographic information systems on the Macintosh computer: a component of the GypsES project

    Science.gov (United States)

    Gregory Elmes; Thomas Millette; Charles B. Yuill

    1991-01-01

    GypsES, a decision-support and expert system for the management of Gypsy Moth addresses five related research problems in a modular, computer-based project. The modules are hazard rating, monitoring, prediction, treatment decision and treatment implementation. One common component is a geographic information system designed to function intelligently. We refer to this...

  14. Program information architecture/document hierarchy. [Information Management Systems, it's components and rationale

    Energy Technology Data Exchange (ETDEWEB)

    Woods, T.W.

    1991-09-01

    The Nuclear Waste Management System (NWMS) Management Systems Improvement Strategy (MSIS) (DOE 1990) requires that the information within the computer program and information management system be ordered into a precedence hierarchy for consistency. Therefore, the US Department of Energy (DOE). Office of Civilian Radioactive Waste Management (OCRWM) requested Westinghouse Hanford Company to develop a plan for NWMS program information which the MSIS calls a document hierarchy. This report provides the results of that effort and describes the management system as a program information architecture.'' 3 refs., 3 figs.

  15. Establishing functional requirements for emergency management information systems

    Energy Technology Data Exchange (ETDEWEB)

    Reed, J.H.; Rogers, G.O.; Sorensen, J.H.

    1991-01-01

    The advancement of computer technologies has led to the development of a number of emergency management information systems (e.g., EIS, CAMEO, IEMIS). The design of these systems has tended to be technologically driven rather than oriented to meeting information management needs during an emergency. Of course, emergency management needs vary depending on the characteristics of the emergency. For example, in hurricanes, onset is typically slow enough to allow emergency managers to simulate evacuations dynamically while in chemical disasters onset may be sufficiently rapid to preclude such simulation(s). This paper describes a system design process in which the analysis of widely recognized emergency management functions was used to identify information requirements and the requisite software and hardware capabilities to deal with rapid onset, low probability, high consequence events. These requirements were then implemented as a prototype emergency management system using existing hardware and software to assure feasibility. Data, hardware, and software requirements were further developed, refined, and made more concrete through an iterative prototyping effort. This approach focuses attention directly on meeting emergency management information needs while avoiding unneeded technological innovations. 10 refs., 4 figs., 1 tab.

  16. Architecture and Functionality of the Advanced Life Support On-Line Project Information System (OPIS)

    Science.gov (United States)

    Hogan, John A.; Levri, Julie A.; Morrow, Rich; Cavazzoni, Jim; Rodriquez, Luis F.; Riano, Rebecca; Whitaker, Dawn R.

    2004-01-01

    An ongoing effort is underway at NASA Amcs Research Center (ARC) tu develop an On-line Project Information System (OPIS) for the Advanced Life Support (ALS) Program. The objective of this three-year project is to develop, test, revise and deploy OPIS to enhance the quality of decision-making metrics and attainment of Program goals through improved knowledge sharing. OPIS will centrally locate detailed project information solicited from investigators on an annual basis and make it readily accessible by the ALS Community via a web-accessible interface. The data will be stored in an object-oriented relational database (created in MySQL(Trademark) located on a secure server at NASA ARC. OPE will simultaneously serve several functions, including being an R&TD status information hub that can potentially serve as the primary annual reporting mechanism. Using OPIS, ALS managers and element leads will be able to carry out informed research and technology development investment decisions, and allow analysts to perform accurate systems evaluations. Additionally, the range and specificity of information solicited will serve to educate technology developers of programmatic needs. OPIS will collect comprehensive information from all ALS projects as well as highly detailed information specific to technology development in each ALS area (Waste, Water, Air, Biomass, Food, Thermal, and Control). Because the scope of needed information can vary dramatically between areas, element-specific technology information is being compiled with the aid of multiple specialized working groups. This paper presents the current development status in terms of the architecture and functionality of OPIS. Possible implementation approaches for OPIS are also discussed.

  17. OPERATIONS RESEARCH IN THE DESIGN OF MANAGEMENT INFORMATION SYSTEMS

    Science.gov (United States)

    management information systems is concerned with the identification and detailed specification of the information and data processing...of advanced data processing techniques in management information systems today, the close coordination of operations research and data systems activities has become a practical necessity for the modern business firm.... information systems in which mathematical models are employed as the basis for analysis and systems design. Operations research provides a

  18. Information Management Systems for Cultural Heritage and Conservation of World Heritage Sites. The Silk Roads Case Study

    Directory of Open Access Journals (Sweden)

    Ona Vileikis

    2011-12-01

    Full Text Available This paper discusses the application of Information Management Systems (IMS in cultural heritage. IMS offer a set of tools for understanding, inventorying and documenting national, regional and World Heritage properties.  Information Management Systems can assist State Parties, stakeholders and heritage site managers involved in cultural heritage management and conservation by easily mining, sharing and exchanging information from multiple sources based on international standards. Moreover, they aim to record, manage, visualize, analyze and disseminate heritage information. In close collaboration with five Central Asian countries, namely, Turkmenistan, Kazakhstan, Kyrgyzstan, Uzbekistan and Tajikistan; a Belgian consortium headed by the Raymond Lemaire International Centre for Conservation (RLICC, K.U.Leuven is developing the Silk Roads Cultural Heritage Resource Information System (CHRIS. This Web-based Information Management System supports the preparation of the Central Asia Silk Roads serial and transnational nominations on the UNESCO World Heritage list. The project has been set up thanks to the financial support of the Belgian Federal Science Policy Office (BELSPO and in collaboration with UNESCO World Heritage Centre in conjunction with the People’s Republic of China and the Japanese Funds-in-Trust UNESCO project. It provides a holistic approach for the recording, documenta tion, protection and monitoring tasks as part of the management of these potential World Heritage Properties. The Silk Roads CHRIS is easily accessible to the general user, presented in a bilingual English and Russian frame and interoperable, i.e. open for other applications to connect to. In this way, all information for the nomination dossiers is easily verified regarding consistency and quality and ready for managing, periodic reporting and monitoring processes in the respect to the property listed. Fina lly, this study provides a general framework to establish

  19. Infrastructure Management Information System User Manual

    Science.gov (United States)

    1998-10-01

    This publication describes and explains the user interface for the Infrastructure Management Information System (IMIS). The IMIS is designed to answer questions regarding public water supply, wastewater treatment, and census information. This publica...

  20. A survey of the use of database management systems in accelerator projects

    CERN Document Server

    Poole, John

    1995-01-01

    The International Accelerator Database Group (IADBG) was set up in 1994 to bring together the people who are working with databases in accelerator laboratories so that they can exchange information and experience. The group now has members from more than 20 institutes from all around the world, representing nearly double this number of projects. This paper is based on the information gathered by the IADBG and describes why commercial DataBase Management Systems (DBMS) are being used in accelerator projects and what they are being used for. Initially introduced to handle equipment builders' data, commercial DBMS are now being used in almost all areas of accelerators from on-line control to personnel data. A variety of commercial systems are being used in conjunction with a diverse selection of application software for data maintenance/manipulation and controls. This paper reviews the database activities known to IADBG.

  1. Development of technical information processing systems

    International Nuclear Information System (INIS)

    Lee, Ji Ho; Kim, Tae Whan; Kim, Sun Ja; Kim, Young Min; Choi, Kwang; Oh, Joung Hun; Choung, Hyun Suk; Keum, Jong Yong; Yoo, An Na; Harn, Deuck Haing; Choun, Young Chun

    1993-12-01

    The major goal of this project is to develop a more efficient information management system by connecting the KAREI serials database which enable the users to access from their own laboratory facilities through KAREI-NET. The importance of this project is to make the serials information of KAERI easily accessible to users as valuable resources for R and D activities. The results of the project are as follows. 1) Development of the serials database and retrieval system enabled us to access to the serials holding information through KAERI-NET. 2) The database construction establishes a foundation for the management of 1,600 serials held in KAERI. 3) The system can be applied not only to KAERI but also to similar medium-level libraries. (Author)

  2. System Wide Information Management (SWIM)

    Science.gov (United States)

    Hritz, Mike; McGowan, Shirley; Ramos, Cal

    2004-01-01

    This viewgraph presentation lists questions regarding the implementation of System Wide Information Management (SWIM). Some of the questions concern policy issues and strategies, technology issues and strategies, or transition issues and strategies.

  3. Understanding information retrieval systems management, types, and standards

    CERN Document Server

    Bates, Marcia J

    2011-01-01

    In order to be effective for their users, information retrieval (IR) systems should be adapted to the specific needs of particular environments. The huge and growing array of types of information retrieval systems in use today is on display in Understanding Information Retrieval Systems: Management, Types, and Standards, which addresses over 20 types of IR systems. These various system types, in turn, present both technical and management challenges, which are also addressed in this volume. In order to be interoperable in a networked environment, IR systems must be able to use various types of

  4. Selection of nuclear power information database management system

    International Nuclear Information System (INIS)

    Zhang Shuxin; Wu Jianlei

    1996-01-01

    In the condition of the present database technology, in order to build the Chinese nuclear power information database (NPIDB) in the nuclear industry system efficiently at a high starting point, an important task is to select a proper database management system (DBMS), which is the hinge of the matter to build the database successfully. Therefore, this article explains how to build a practical information database about nuclear power, the functions of different database management systems, the reason of selecting relation database management system (RDBMS), the principles of selecting RDBMS, the recommendation of ORACLE management system as the software to build database and so on

  5. Improvements to information management systems simulator

    Science.gov (United States)

    Bilek, R. W.

    1972-01-01

    The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.

  6. Marine biological data and information management system

    Digital Repository Service at National Institute of Oceanography (India)

    Sarupria, J.S.

    Indian National Oceanographic Data Centre (INODC) is engaged in developing a marine biological data and information management system (BIODIMS). This system will contain the information on zooplankton in the water column, zoobenthic biomass...

  7. Advanced Approach to Information Security Management System Model for Industrial Control System

    Directory of Open Access Journals (Sweden)

    Sanghyun Park

    2014-01-01

    Full Text Available Organizations make use of important information in day-to-day business. Protecting sensitive information is imperative and must be managed. Companies in many parts of the world protect sensitive information using the international standard known as the information security management system (ISMS. ISO 27000 series is the international standard ISMS used to protect confidentiality, integrity, and availability of sensitive information. While an ISMS based on ISO 27000 series has no particular flaws for general information systems, it is unfit to manage sensitive information for industrial control systems (ICSs because the first priority of industrial control is safety of the system. Therefore, a new information security management system based on confidentiality, integrity, and availability as well as safety is required for ICSs. This new ISMS must be mutually exclusive of an ICS. This paper provides a new paradigm of ISMS for ICSs, which will be shown to be more suitable than the existing ISMS.

  8. Advanced approach to information security management system model for industrial control system.

    Science.gov (United States)

    Park, Sanghyun; Lee, Kyungho

    2014-01-01

    Organizations make use of important information in day-to-day business. Protecting sensitive information is imperative and must be managed. Companies in many parts of the world protect sensitive information using the international standard known as the information security management system (ISMS). ISO 27000 series is the international standard ISMS used to protect confidentiality, integrity, and availability of sensitive information. While an ISMS based on ISO 27000 series has no particular flaws for general information systems, it is unfit to manage sensitive information for industrial control systems (ICSs) because the first priority of industrial control is safety of the system. Therefore, a new information security management system based on confidentiality, integrity, and availability as well as safety is required for ICSs. This new ISMS must be mutually exclusive of an ICS. This paper provides a new paradigm of ISMS for ICSs, which will be shown to be more suitable than the existing ISMS.

  9. Advanced Approach to Information Security Management System Model for Industrial Control System

    Science.gov (United States)

    2014-01-01

    Organizations make use of important information in day-to-day business. Protecting sensitive information is imperative and must be managed. Companies in many parts of the world protect sensitive information using the international standard known as the information security management system (ISMS). ISO 27000 series is the international standard ISMS used to protect confidentiality, integrity, and availability of sensitive information. While an ISMS based on ISO 27000 series has no particular flaws for general information systems, it is unfit to manage sensitive information for industrial control systems (ICSs) because the first priority of industrial control is safety of the system. Therefore, a new information security management system based on confidentiality, integrity, and availability as well as safety is required for ICSs. This new ISMS must be mutually exclusive of an ICS. This paper provides a new paradigm of ISMS for ICSs, which will be shown to be more suitable than the existing ISMS. PMID:25136659

  10. Columbia River Coordinated Information System (CIS); Information Needs, 1992 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Petrosky, Charlie (Idaho Department of Fish and Game, Boise, ID); Kinney, William J. (Washington Department of Fishereis, Olympia, WA); Rowe, Mike (Shoshone-Bannock Tribes, Fort Hall, ID)

    1993-05-01

    Successful application of adaptive management to rebuilding the Columbia Basin`s anadromous fish resources requires that available information and experience be organized and shared between numerous organizations and individuals. Much of this knowledge exists only in unpublished form in agency and individual files. Even that information which is published in the form of technical and contract reports receives only limited distribution and is often out of print and unavailable after a few years. Only a small fraction of the basin`s collective knowledge is captured in permanent and readily available databases and recognized journals. State, tribal, and federal fishery managers have recognize these information management problems and have committed to a program, the Coordinated Information System Project, to capture and share more easily the core data and other information upon which management decisions are based. That project is now completing the process of scoping and identification of information needs. Construction of prototype systems will begin in 1992. This report is one in a series of seven describing the results of the Coordinated Information on System scoping and needs identification phase.

  11. Databases in the documentation management for big industrial projects

    International Nuclear Information System (INIS)

    Cauchet, A.; Chevillard, F.; Parisot, Y.; Tirefort, C.

    1990-05-01

    The documentation management of a big industrial project involves a continuous update of information, both in the study and realization phase or in the operation phase. The organization of the technical documentation for big industrial projects requests complex information systems. In the first part of this paper are presented the methods appropriate for the analysis of documentation management procedures and in the second part are presented the tools by the combination of which a documentation system for the user is provided. The case of the documentation centres for the Hague reprocessing plant is described

  12. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  13. Implementation of Hepatitis Information Management System in Iran.

    Science.gov (United States)

    Reza, Safdari; Jebraeil, Farzi; Akbar, Nasiri Ali; Marjan, Ghazisaeedi; Reza, Taghavi Mohammad; Mehdi, Afshari; Mahlagha, Sargolzaee; Farhad, Taji

    2015-11-17

    Nowadays, hepatitis is of the most important health priorities around the world, where information plays a very significant role in specialized diseases prevention planning, and policy- and decision-making processes. Thus, this study addressed challenges of hepatitis information management and investigated the outcomes of establishing a hepatitis information management system to overcome such challenges. To this end, this research intended to study the implementation of an Electronic hepatitis information management system. This is an applied-developmental study with following specifications and procedures: preparation of study proposal and design, justification of the design's stakeholders, approval of the design by the Postgraduate Education Council of Faculty, determination of pilot hepatitis control center, software development, deciding on control, prevention, and treatment centers, and finally development of a network-based system for collecting and managing hepatitis information. Results indicated that the inconsistency and lack of integrity of data, as well as the lack of communication between related units prevented timely information register of viral hepatic patients and services that are provided to them. This inhibited the possibility of considering a follow-up process. However, the implementation of this system and involvement of relevant units greatly solved these problems. Results show that the implementation of an electronic system for the management of hepatitis control, prevention, and treatment is a regional and national requirement; since, this system with its empowered infrastructure is capable in providing desired services to all laboratories, counseling and health centers, specialized clinics, and physicians connected to the hepatitis network. This enables them to follow up and monitor patients' conditions. That mentioned system paves the way for the analysis of gathered information, managers' and specialists' access in different regions to

  14. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  15. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  16. Region 7 Laboratory Information Management System

    Science.gov (United States)

    This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory analytical work performed is stored in this system which replaces LIMS-Lite, and before that LAST. The EPA and its contractors may use this database. The Office of Policy & Management (PLMG) Division at EPA Region 7 is the primary managing entity; contractors can access this database but it is not accessible to the public.

  17. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  18. Implementation of a drainage information, analysis and management system

    Directory of Open Access Journals (Sweden)

    J.N. Meegoda

    2017-04-01

    Full Text Available An integrated drainage information, analysis and management system (DIAMS was developed and implemented for the New Jersey Department of Transportation (NJDOT. The purpose of the DIAMS is to provide a useful tool for managers to evaluate drainage infrastructure, to facilitate the determination of the present costs of preserving those infrastructures, and to make decisions regarding the optimal use of their infrastructure budgets. The impetus for DIAMS is the culvert information management system (CIMS, which is developed to manage the data for culvert pipes. DIAMS maintains and summarizes accumulated inspection data for all types of drainage infrastructure assets, including pipes, inlet/outlet structures, outfalls and manufactured treatment devices. DIAMS capabilities include identifying drainage infrastructure, maintaining inspection history, mapping locations, predicting service life based on the current condition states, and assessing present asset value. It also includes unit cost values of 72 standard items to estimate the current cost for new assets with the ability to adjust for future inflation. In addition, DIAMS contains several different repair, rehabilitation and replacement options to remedy the drainage infrastructure. DIAMS can analyze asset information and determine decisions to inspect, rehabilitate, replace or do nothing at the project and network levels by comparing costs with risks and failures. Costs may be optimized to meet annual maintenance budget allocations by prioritizing drainage infrastructure needing inspection, cleaning and repair. DIAMS functional modules include vendor data uploading, asset identification, system administration and financial analysis. Among the significant performance feature of DIAMS is its proactive nature, which affords decision makers the means of conducting a comprehensive financial analysis to determine the optimal proactive schedule for the proper maintenance actions and to prioritize them

  19. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  20. Justification of computational methods to ensure information management systems

    Directory of Open Access Journals (Sweden)

    E. D. Chertov

    2016-01-01

    Full Text Available Summary. Due to the diversity and complexity of organizational management tasks a large enterprise, the construction of an information management system requires the establishment of interconnected complexes of means, implementing the most efficient way collect, transfer, accumulation and processing of information necessary drivers handle different ranks in the governance process. The main trends of the construction of integrated logistics management information systems can be considered: the creation of integrated data processing systems by centralizing storage and processing of data arrays; organization of computer systems to realize the time-sharing; aggregate-block principle of the integrated logistics; Use a wide range of peripheral devices with the unification of information and hardware communication. Main attention is paid to the application of the system of research of complex technical support, in particular, the definition of quality criteria for the operation of technical complex, the development of information base analysis methods of management information systems and define the requirements for technical means, as well as methods of structural synthesis of the major subsystems of integrated logistics. Thus, the aim is to study on the basis of systematic approach of integrated logistics management information system and the development of a number of methods of analysis and synthesis of complex logistics that are suitable for use in the practice of engineering systems design. The objective function of the complex logistics management information systems is the task of gathering systems, transmission and processing of specified amounts of information in the regulated time intervals with the required degree of accuracy while minimizing the reduced costs for the establishment and operation of technical complex. Achieving the objective function of the complex logistics to carry out certain organization of interaction of information

  1. GRIN-Global: An International Project to Develop a Global Plant Genebank and Information Management System

    Science.gov (United States)

    Many of the world's national genebanks, responsible for the safeguarding and availability of their country's Plant Genetic Resource (PGR) collections, have lacked access to high quality IT needed to document and manage their collections electronically. The Germplasm Resource Information System (GRI...

  2. Information system revives materials management

    International Nuclear Information System (INIS)

    Hansen, T.

    1995-01-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD)

  3. The Information Management Platform on Nuclear Emergency Resources of China

    International Nuclear Information System (INIS)

    Dong, L.

    2016-01-01

    Full text: The Chinese government has always attached great importance to nuclear emergency work, and has invested to form lots of nuclear emergency resources. Meanwhile, there also exist some management problems such as repeated investment, fragmented inventory list, inefficient management, etc. To achieve integrated management on the nuclear emergency resources of China, the Chinese government initiated the project “The Information Management Platform on Nuclear Emergency Resources of China”. The goal of the project is to support a timely, managed, controlled, coordinated and effective response while the resources managing process remains economically efficient. The project team firstly completed the nuclear emergency resources classification and encoding. Based on these, the nuclear emergency resources information management software system was developed. The pilot operation in the system was carried out both in Guangxi and Liaoning Province at the same time. Nuclear emergency resources survey was done as the relevant information was put into the database in these regions. The evaluation result on the pilot operation showed that, the information management platform on emergency resources would apparently improve efficiency of nuclear emergency preparedness and response, and it also would increase economical efficiency on inventory list, information management and invest decision. (author

  4. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  5. Management information system applied to radiation protection services

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Souza, Leonardo Soares de; Figueiredo, Geraldo Magela; Figueiredo, Arthur

    2013-01-01

    An effective management information system based on technology, information and people is necessary to improve the safety on all processes and operations subjected to radiation risks. The complex and multisource information flux from all radiation protection activities on nuclear organizations requires a robust tool/system to highlight the strengths and weaknesses and identify behaviors and trends on the activities requiring radiation protection programs. Those organized and processed data are useful to reach a successful management and to support the human decision-making on nuclear organization. This paper presents recent improvements on a management information system based on the radiation protection directives and regulations from Brazilian regulatory body. This radiation protection control system is applied to any radiation protection services and research institutes subjected to Brazilian nuclear regulation and is a powerful tool for continuous management, not only indicating how the health and safety activities are going, but why they are not going as well as planned showing up the critical points. (author)

  6. Management information system applied to radiation protection services

    Energy Technology Data Exchange (ETDEWEB)

    Grossi, Pablo Andrade; Souza, Leonardo Soares de; Figueiredo, Geraldo Magela; Figueiredo, Arthur, E-mail: pabloag@cdtn.br, E-mail: lss@cdtn.br, E-mail: gmf@cdtn.br, E-mail: arthurqof@gmail.com [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2013-07-01

    An effective management information system based on technology, information and people is necessary to improve the safety on all processes and operations subjected to radiation risks. The complex and multisource information flux from all radiation protection activities on nuclear organizations requires a robust tool/system to highlight the strengths and weaknesses and identify behaviors and trends on the activities requiring radiation protection programs. Those organized and processed data are useful to reach a successful management and to support the human decision-making on nuclear organization. This paper presents recent improvements on a management information system based on the radiation protection directives and regulations from Brazilian regulatory body. This radiation protection control system is applied to any radiation protection services and research institutes subjected to Brazilian nuclear regulation and is a powerful tool for continuous management, not only indicating how the health and safety activities are going, but why they are not going as well as planned showing up the critical points. (author)

  7. Success Rates by Software Development Methodology in Information Technology Project Management: A Quantitative Analysis

    Science.gov (United States)

    Wright, Gerald P.

    2013-01-01

    Despite over half a century of Project Management research, project success rates are still too low. Organizations spend a tremendous amount of valuable resources on Information Technology projects and seek to maximize the utility gained from their efforts. The author investigated the impact of software development methodology choice on ten…

  8. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  9. 75 FR 10806 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2010-03-09

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... INFORMATION CONTACT: Beth Duvall-Miller, Center for Drug Evaluation and Research, Food and Drug Administration... to provide the following: (1) First hand exposure to industry's drug development processes and (2) a...

  10. 77 FR 10538 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2012-02-22

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Brum, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave...) Firsthand exposure to industry's drug development processes and (2) a venue for sharing information about...

  11. Experiential learning in control systems laboratories and engineering project management

    Science.gov (United States)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  12. Information management of the geoinformation systems

    Directory of Open Access Journals (Sweden)

    Trifković Milan

    2010-01-01

    Full Text Available Importance of information management procedures and practice based on of defined and accepted frame within an organization, is discussed. It is a common presumption that transformation of data into information brings the level of knowledge to support right decision making. However, these efforts and investments often do not result in increased efficiency, due to absence of well defined and designed transactional and informational systems. As a consequence, many organizations are 'rich' in data, but still 'poor' in information. Difference between transactional (or operational and informational systems are highlighted, too.

  13. Between a rock and a hard place: Management and implementation teams’ expectations of project managers in an agile information systems delivery environment

    Directory of Open Access Journals (Sweden)

    Songezo Nkukwana

    2017-08-01

    Objectives: This case study investigated how project managers could adapt to agile IS implementation environments to remain relevant. Specifically, the views of their key stakeholders (the management and implementation teams were elicited to provide insights into what is expected from agile project managers. Method: A qualitative, inductive content analysis approach using purposive sampling was used to identify 13 participants (comprising management and implementation team members within a large South African insurance company. Semi-structured interviews were conducted with all participants. Results: The management and implementation teams agreed that PM remains highly relevant in an agile environment for ensuring project governance including delivery, risk management, reporting and budgeting. There was, however, disagreement between the management and implementation teams on project management interaction with the implementation team. Management preferred a command and control type project manager, while the implementation team favoured a more inclusive, facilitative PM style. Conclusion: To remain viable in an agile IS project implementation environment within large corporates, project managers need to be aware of what various stakeholders expect of them. They need to retain some of the classic PM functions while adapting to the interpersonal and collaborative requirements of the agile way.

  14. Emergency response information within the National LLW Information Management System

    International Nuclear Information System (INIS)

    Paukert, J.G.; Fuchs, R.L.

    1986-01-01

    The U.S. Department of Energy, with operational assistance from EG and G Idaho, Inc., maintains the National Low-Level Waste Information Management System, a relational data base management system with extensive information collection and reporting capabilities. The system operates on an IBM 4341 main-frame computer in Idaho Falls, Idaho and is accessible through terminals in 46 states. One of the many programs available on the system is an emergency response data network, which was developed jointly by EG and G Idaho, Inc. and the Federal Emergency Management Agency. As a prototype, the program comprises emergency response team contacts, policies, activities and decisions; federal, state and local government contacts; facility and support center locations; and news releases for nine reactor sites in the southeast. The emergency response program provides a method for consolidating currently fragmented information into a central and user-friendly system. When the program is implemented, immediate answers to response questions will be available through a remote terminal or telephone on a 24-hour basis. In view of current hazardous and low-level waste shipment rates and future movements of high-level waste, the program can offer needed and timely information for transportation as well as site incident response

  15. 78 FR 60245 - Privacy Act Systems of Records; LabWare Laboratory Information Management System

    Science.gov (United States)

    2013-10-01

    ... of Records; LabWare Laboratory Information Management System AGENCY: Animal and Plant Health... system of records, entitled LabWare Laboratory Information Management System (LabWare LIMS), to maintain... Affairs, OMB. Thomas J. Vilsack, Secretary. SYSTEM NAME: LabWare Laboratory Information Management System...

  16. AQUIS: An air quality and permit information management system

    Energy Technology Data Exchange (ETDEWEB)

    Smith, A.E.; Huber, C.C.; Tschanz, J. (Argonne National Lab., IL (USA)); Ryckman, S.J. Jr. (Air Force Logistics Command, Wright-Patterson AFB, OH (USA))

    1991-01-01

    The Air Quality Utility Information System (AQUIS) is a data base management system that operates on a dedicated, IBM-compatible personal computer using dBASE IV. AQUIS is in operation at six of the seven US Air Force Logistics Command (AFLC) bases to assist with the management of the source inventory, permit tracking, and the estimating and tracking of emissions. The system also provides environmental management personnel with information on regulatory requirements and other compliance information. An AFLC base can have over 500 regulated or unregulated emission sources, and the task of tracking and correlating emissions, sources, and permits is substantial. AQUIS is a comprehensive management tool that provides a single system for storing and accessing information previously available only in multiple, uncorrelated files. This paper discusses the development of the system and provides an overview of the system structure and the relationship of that structure to sources in the field. Certain features such as the linking capability and compound-specific emissions are highlighted. The experience of environmental managers, the ultimate system users, is discussed, including specific ways in which AQUIS has proven useful in responding to managers' needs for air quality information. 10 refs., 3 figs., 1 tab.

  17. The System 80+ Standard Plant Information Management System

    Energy Technology Data Exchange (ETDEWEB)

    Turk, R.S.; Bryan, R.E. [ABB Combuions Engineering Nuclear Systems (United States)

    1998-07-01

    Historically, electric nuclear power plant owners, following the completion of construction and startup, have been left with a mountain of hard-copy documents and drawings. Hundreds of thousands of hours are spent searching for relevant documents and, in most cases, the documents found require many other documents and drawings to fully understand the design basis. All too often the information is incomplete, and eventually becomes obsolete. In the U.S., utilities spend millions of dollars to discover design basis information and update as-built data for each plant. This information must then be stored in an easily accessed usable form to assist satisfy regulatory requirements and to improve plant operating efficiency. ABB Combustion Engineering Nuclear Systems (ABB-CE) has an active program to develop a state-of-the-art Plant Information Management System (IMS) for its advanced light water reactor, the System 80+TM Standard Plant Design. This program is supported by ABB's Product Data Management (PDM) and Computer Aided Engineering (CAE) efforts world wide. This paper describes the System 80+ plant IMS and how it will be used during the entire life cycle of the plant. (author)

  18. The System 80+ Standard Plant Information Management System

    International Nuclear Information System (INIS)

    Turk, R.S.; Bryan, R.E.

    1998-01-01

    Historically, electric nuclear power plant owners, following the completion of construction and startup, have been left with a mountain of hard-copy documents and drawings. Hundreds of thousands of hours are spent searching for relevant documents and, in most cases, the documents found require many other documents and drawings to fully understand the design basis. All too often the information is incomplete, and eventually becomes obsolete. In the U.S., utilities spend millions of dollars to discover design basis information and update as-built data for each plant. This information must then be stored in an easily accessed usable form to assist satisfy regulatory requirements and to improve plant operating efficiency. ABB Combustion Engineering Nuclear Systems (ABB-CE) has an active program to develop a state-of-the-art Plant Information Management System (IMS) for its advanced light water reactor, the System 80+TM Standard Plant Design. This program is supported by ABB's Product Data Management (PDM) and Computer Aided Engineering (CAE) efforts world wide. This paper describes the System 80+ plant IMS and how it will be used during the entire life cycle of the plant. (author)

  19. Implementation of two new resource management information systems in Australia

    Energy Technology Data Exchange (ETDEWEB)

    Kessell, S.R.; Good, R.B.; Hopkins, A.J.M.

    1984-05-01

    This paper describes the development and implementation of PREPLAN, A Pristine Environment Planning Language and Simulator, for two conservation areas in Australia, Kosciusko National Park (New South Wales) and Tutanning Nature Reserve (Western Australia). PREPLAN was derived from the North American gradient modeling systems and the Forest Planning Language and Simulator (FORPLAN), but includes unique characteristics not previously available. PREPLAN includes an integrated resource management data base, modules for predicting site-specific vegetation, fuels, animals, fire behavior, and fire effects, and an English language instruction set. PREPLAN was developed specifically to provide available information and understanding of ecosystems to managers in a readily accessible and usable form, and to provide the motivation to conduct additional required research projects. An evaluation of the system's advantages and limitations is presented, and the way the utilization of such systems is improving natural area decision making throughout Australia is discussed.

  20. Implementation of two new resource management information systems in Australia

    Science.gov (United States)

    Kessell, Stephen R.; Good, Roger B.; Hopkins, Angas J. M.

    1984-05-01

    This paper describes the development and implementation of PREPLAN, A Pristine Environment Planning Language and Simulator, for two conservation areas in Australia, Kosciusko National Park (New South Wales) and Tutanning Nature Reserve (Western Australia). PREPLAN was derived from the North American gradient modeling systems and the Forest Planning Language and Simulator (FORPLAN), but includes unique characteristics not previously available. PREPLAN includes an integrated resource management data base, modules for predicting site-specific vegetation, fuels, animals, fire behavior, and fire effects, and an English language instruction set. PREPLAN was developed specifically to provide available information and understanding of ecosystems to managers in a readily accessible and usable form, and to provide the motivation to conduct additional required research projects. An evaluation of the system's advantages and limitations is presented, and the way the utilization of such systems is improving natural area decision making throughout Australia is discussed.

  1. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    Science.gov (United States)

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  2. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  3. A visual representation system for the scheduling and management of projects

    NARCIS (Netherlands)

    Pollalis, S.N.

    1992-01-01

    A VISUAL SCHEDULING AND MANAGEMENT SYSTEM (VSMS) This work proposes a new system for the visual representation of projects that displays the quantities of work, resources and cost. This new system, called Visual Scheduling and Management System, has a built-in hierarchical system to provide

  4. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  5. Information systems in food safety management.

    Science.gov (United States)

    McMeekin, T A; Baranyi, J; Bowman, J; Dalgaard, P; Kirk, M; Ross, T; Schmid, S; Zwietering, M H

    2006-12-01

    Information systems are concerned with data capture, storage, analysis and retrieval. In the context of food safety management they are vital to assist decision making in a short time frame, potentially allowing decisions to be made and practices to be actioned in real time. Databases with information on microorganisms pertinent to the identification of foodborne pathogens, response of microbial populations to the environment and characteristics of foods and processing conditions are the cornerstone of food safety management systems. Such databases find application in: Identifying pathogens in food at the genus or species level using applied systematics in automated ways. Identifying pathogens below the species level by molecular subtyping, an approach successfully applied in epidemiological investigations of foodborne disease and the basis for national surveillance programs. Predictive modelling software, such as the Pathogen Modeling Program and Growth Predictor (that took over the main functions of Food Micromodel) the raw data of which were combined as the genesis of an international web based searchable database (ComBase). Expert systems combining databases on microbial characteristics, food composition and processing information with the resulting "pattern match" indicating problems that may arise from changes in product formulation or processing conditions. Computer software packages to aid the practical application of HACCP and risk assessment and decision trees to bring logical sequences to establishing and modifying food safety management practices. In addition there are many other uses of information systems that benefit food safety more globally, including: Rapid dissemination of information on foodborne disease outbreaks via websites or list servers carrying commentary from many sources, including the press and interest groups, on the reasons for and consequences of foodborne disease incidents. Active surveillance networks allowing rapid dissemination

  6. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2012-01-01

    Software-based information systems must be developed and implemented as a part of business change. This is a major challenge, since business change and the development of software-based information systems usually are performed in separate processes. Thus, there is a need to understand and manage...... critical events in the case, what led to the events, and what the consequences are. We discuss the implications for information systems research and in particular we discuss the contribution to project management of iterative and incremental software development.......Software-based information systems must be developed and implemented as a part of business change. This is a major challenge, since business change and the development of software-based information systems usually are performed in separate processes. Thus, there is a need to understand and manage...

  7. An architecture model for multiple disease management information systems.

    Science.gov (United States)

    Chen, Lichin; Yu, Hui-Chu; Li, Hao-Chun; Wang, Yi-Van; Chen, Huang-Jen; Wang, I-Ching; Wang, Chiou-Shiang; Peng, Hui-Yu; Hsu, Yu-Ling; Chen, Chi-Huang; Chuang, Lee-Ming; Lee, Hung-Chang; Chung, Yufang; Lai, Feipei

    2013-04-01

    Disease management is a program which attempts to overcome the fragmentation of healthcare system and improve the quality of care. Many studies have proven the effectiveness of disease management. However, the case managers were spending the majority of time in documentation, coordinating the members of the care team. They need a tool to support them with daily practice and optimizing the inefficient workflow. Several discussions have indicated that information technology plays an important role in the era of disease management. Whereas applications have been developed, it is inefficient to develop information system for each disease management program individually. The aim of this research is to support the work of disease management, reform the inefficient workflow, and propose an architecture model that enhance on the reusability and time saving of information system development. The proposed architecture model had been successfully implemented into two disease management information system, and the result was evaluated through reusability analysis, time consumed analysis, pre- and post-implement workflow analysis, and user questionnaire survey. The reusability of the proposed model was high, less than half of the time was consumed, and the workflow had been improved. The overall user aspect is positive. The supportiveness during daily workflow is high. The system empowers the case managers with better information and leads to better decision making.

  8. Developing the information management system for safeguards national inspection

    International Nuclear Information System (INIS)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S.

    2003-01-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection

  9. Management information systems in the HMO environment.

    Science.gov (United States)

    Neal, P A

    1982-01-01

    Realization of the unique potential of a health maintenance organization is dependent on the availability of adequate, accurate, and timely information. The particular data needed are determined by the structure of the organization; the physician compensation plans; requirements for state, federal, or other reporting; and many other factors. The author introduces the concept and objectives of the HMO, and presents the management information systems necessary for planning and monitoring HMO performance: patient information, utilization information, and management information for the staff and nonstaff HMO.

  10. Federal Emergency Management Information system (FEMIS) data management guide. Version 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Burnett, R.A.; Downing, T.R.; Gaustad, K.L.; Johnson, S.M.; Loveall, R.M.; Winters, C.

    1996-05-01

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Chemical and Biological Defense Command. The FEMIS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain the data resources in the system. Database administrators, system administrators, and general users can use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of FEMIS. This document provides a description of the relational and spatial information present in FEMIS. It describes how the data was assembled, how it is loaded, and how it is managed while the system is in operation.

  11. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  12. Managing Health Information System | Campbell | Nigerian ...

    African Journals Online (AJOL)

    The effective planning, management monitoring and evaluation of health services, health resources and indeed the health system requires a wealth of health information, with its simultaneous effective and efficient management. It is an instrument used to help policy-making, decision making and day to day actions in the ...

  13. The development of KAERI management information system (II) -The development of Time Sheet Management System-

    International Nuclear Information System (INIS)

    Kang, Sin Bok; Kim, Yeong Taek; Park, Soo Jin; Ko, Yeong Cheol; Lee, Jong Bok; Han, Eun Sook; Kim, Hyeon Jeong

    1994-01-01

    The purpose of this report is to describe the work done for the development, operation and maintenance of Time Sheet Management System. This work is a part of the development KAERI management information system. Manpower management is essential to cope with the external circumstances promptly and to maximize the productivity of the organization. This work aims at setting up a basis for the manpower management system. It is widely recognized that neither timely decision making nor competitive edge can be secured with the traditional management technology in so a rapidly changing situations home and abroad, which can be characterized by openness and informality. The necessity of efficient and scientific man-power management by time-study has emerged on the reorganization of KAERI by expanding matrix system in order to enhance the R and D productivity. (Author)

  14. The application and development on radiation monitoring microcomputer management system in design of a certain project

    International Nuclear Information System (INIS)

    Zhang Hongyou

    1993-01-01

    A scheme of a radiation monitoring system with a RMMMS (Radiation Monitoring Microcomputer Management System) has been designed for the first time in the radiation protection design of a certain nuclear projection undertaken by the BINE (Beijing Institute of Nuclear Engineering). Meanwhile, we accepted the research task of the RMMMS that can manage 40 monitoring channel. The key factors of radiation monitors, microcomputer, information management and systematic design method are considered in the development of the RMMMS. This paper presents briefly the scheme and functions of the RMMMS

  15. Development Approach of the Advanced Life Support On-line Project Information System

    Science.gov (United States)

    Levri, Julie A.; Hogan, John A.; Morrow, Rich; Ho, Michael C.; Kaehms, Bob; Cavazzoni, Jim; Brodbeck, Christina A.; Whitaker, Dawn R.

    2005-01-01

    The Advanced Life Support (ALS) Program has recently accelerated an effort to develop an On-line Project Information System (OPIS) for research project and technology development data centralization and sharing. There has been significant advancement in the On-line Project Information System (OPIS) over the past year (Hogan et al, 2004). This paper presents the resultant OPIS development approach. OPIS is being built as an application framework consisting of an uderlying Linux/Apache/MySQL/PHP (LAMP) stack, and supporting class libraries that provides database abstraction and automatic code generation, simplifying the ongoing development and maintenance process. Such a development approach allows for quick adaptation to serve multiple Programs, although initial deployment is for an ALS module. OPIS core functionality will involve a Web-based annual solicitation of project and technology data directly from ALS Principal Investigators (PIs) through customized data collection forms. Data provided by PIs will be reviewed by a Technical Task Monitor (TTM) before posting the information to OPIS for ALS Community viewing via the Web. Such Annual Reports will be permanent, citable references within OPIS. OPlS core functionality will also include Project Home Sites, which will allow PIS to provide updated technology information to the Community in between Annual Report updates. All data will be stored in an object-oriented relational database, created in MySQL(Reistered Trademark) and located on a secure server at NASA Ames Research Center (ARC). Upon launch, OPlS can be utilized by Managers to identify research and technology development (R&TD) gaps and to assess task performance. Analysts can employ OPlS to obtain the current, comprehensive, accurate information about advanced technologies that is required to perform trade studies of various life support system options. ALS researchers and technology developers can use OPlS to achieve an improved understanding of the NASA

  16. [Application of information management system about medical equipment].

    Science.gov (United States)

    Hang, Jianjin; Zhang, Chaoqun; Wu, Xiang-Yang

    2011-05-01

    Based on the practice of workflow, information management system about medical equipment was developed and its functions such as gathering, browsing, inquiring and counting were introduced. With dynamic and complete case management of medical equipment, the system improved the management of medical equipment.

  17. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  18. INFORMATION-ANALYTICAL SYSTEM OF EDUCATIONAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Y. Tryus

    2011-05-01

    Full Text Available The conceptual approaches to create the information-analytical system of educational management, which used modern methods of decision-making and simulation, web-technology are considered. The main criteria for selection of system development are: openness, free of charge, easy of use and independence of system software and hardware. The technology and the system itself meets the requirements as: focus on national and international standards in higher education, compliance with service-oriented architecture, ensure stable operation for a large number of users, support a clear division of users rights to obtain and change information resources, modularity of final product and its ability to integrate into the university corporate information system.

  19. Development of information management system on LWR spent fuel

    International Nuclear Information System (INIS)

    Lee, B. D.; Lee, S. H.; Song, D. Y.; Jeon, I.; Park, S. J.; Seo, D. S.

    2002-01-01

    LWRs in Korea should manage all the information of spent fuel to implement the obligations under Korea-IAEA safeguards agreement and to perform the nuclear material accountancy work at the facility level. The information management system on LWR spent fuel was developed to manage all movement records from receipt to shipment of LWR fuels, and to get the necessary information such as nuclear fuel inventory lists and status, maps of fresh fuel storage, reactor and spent fuel pool, receipt and shipment records and so on. This information management system has a function to setup the system environments to cover the various kinds of storage types for all LWRs ; reactor, spent fuel pool and fresh fuel storage. The movements of nuclear fuel between the storages can be easily done by double click of the mouse to the destination. It also has a several error checking routines for maintaining the correct accounting data. Using this information management system of LWR spent fuel, facility operators can perform efficiently and effectively the safeguards related works including nuclear material accountancy at each facility

  20. Development of information management system on LWR spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Lee, B. D.; Lee, S. H.; Song, D. Y.; Jeon, I.; Park, S. J.; Seo, D. S. [KAERI, Taejon (Korea, Republic of)

    2002-10-01

    LWRs in Korea should manage all the information of spent fuel to implement the obligations under Korea-IAEA safeguards agreement and to perform the nuclear material accountancy work at the facility level. The information management system on LWR spent fuel was developed to manage all movement records from receipt to shipment of LWR fuels, and to get the necessary information such as nuclear fuel inventory lists and status, maps of fresh fuel storage, reactor and spent fuel pool, receipt and shipment records and so on. This information management system has a function to setup the system environments to cover the various kinds of storage types for all LWRs ; reactor, spent fuel pool and fresh fuel storage. The movements of nuclear fuel between the storages can be easily done by double click of the mouse to the destination. It also has a several error checking routines for maintaining the correct accounting data. Using this information management system of LWR spent fuel, facility operators can perform efficiently and effectively the safeguards related works including nuclear material accountancy at each facility.

  1. Laboratory Information Systems Management and Operations.

    Science.gov (United States)

    Cucoranu, Ioan C

    2015-06-01

    The main mission of a laboratory information system (LIS) is to manage workflow and deliver accurate results for clinical management. Successful selection and implementation of an anatomic pathology LIS is not complete unless it is complemented by specialized information technology support and maintenance. LIS is required to remain continuously operational with minimal or no downtime and the LIS team has to ensure that all operations are compliant with the mandated rules and regulations. Copyright © 2015 Elsevier Inc. All rights reserved.

  2. Developing the information management system for safeguards national inspection

    Energy Technology Data Exchange (ETDEWEB)

    Park, S. J.; Jeon, I.; Park, W. S.; Min, K. S. [KAERI, Taejon (Korea, Republic of)

    2003-10-01

    The inspection information management system for safeguards national inspection is aimed to do the national safeguards inspection with efficiency, and to decrease the inspector's load to write inspection report by systematizing the inspection jobs and sharing the inspection data. National safeguards inspection is consisted two large jobs. The first is the national safeguards supporting job of managing to support the national inspection mission. The other is the writing a national inspection report after completing the national inspection. Before the developing of inspection information management system, the official tools(spread sheet, word processor) are usually used. But there is problem to share the data, to produce the statistics data. To solve the these problem, we developed the inspection information management system that process the job from initial to final inspection work, and opened user education. This paper explain the procedure of developing the inspection information management system for safeguards national inspection.

  3. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    Science.gov (United States)

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  4. Office of university affairs management information system: Users guide and documentation

    Science.gov (United States)

    Distin, J.; Goodwin, D.; Greene, W. A.

    1977-01-01

    Data on the NASA-University relationship are reported that encompass research in over 600 schools through several thousand grants and contracts. This user-driven system is capable of producing a variety of cyclical and query-type reports describing the total NASA-University profile. The capabilities, designed as part of the system, require a minimum of user maintenance in order to ensure system efficiency and data validity to meet the recurrent Statutory and Executive Branch information requirements as well as ad hoc inquiries from NASA general management, Congress, other Federal agencies, private sector organizations, universities and individuals. The data base contains information on each university, the individual projects and the financial details, current and historic, on all contracts and grants. Complete details are given on the system from its unique design features to the actual steps required for daily operation.

  5. Development of a Network-Based Information Infrastructure for Fisheries and Hydropower Information in the Columbia River Basin : Final Project Report.

    Energy Technology Data Exchange (ETDEWEB)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-05-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program.

  6. From Management Information Systems to Business Intelligence: The Development of Management Information Needs

    Directory of Open Access Journals (Sweden)

    Gėlytė Kazakevičienė

    2013-09-01

    Full Text Available Despite the advances in IT, information systems intended for management informing did not uniformly fulfil the increased expectations of users; this can be said mostly about complex information needs. Although some of the technologies for supporting complicated insights, like management decision support systems and technologies, experienced reduction in interest both from researchers and practitioners, this did not reduce the importance of well-supported business informing and decision making. Being attributed to the group of intelligent systems and technologies, decision support (DS technologies have been largely supplemented by business intelligence (BI technologies. Both types of technologies are supported by respective information technologies, which often appear to be quite closely related. The objective of this paper is to define relations between simple and complex informing intended to satisfy different sets of needs and provided by different sets of support tools. The paper attempts to put together decision support and business intelligence technologies, based on common goals of sense-making and use of advanced analytical tools. A model of two interconnected cycles has been developed to relate the activities of decision support and business intelligence. Empirical data from earlier research is used to direct possible further insights into this area.

  7. [The development of hospital medical supplies information management system].

    Science.gov (United States)

    Cao, Shaoping; Gu, Hongqing; Zhang, Peng; Wang, Qiang

    2010-05-01

    The information management of medical materials by using high-tech computer, in order to improve the efficiency of the consumption of medical supplies, hospital supplies and develop a new technology way to manage the hospital and material support. Using C # NET, JAVA techniques to develop procedures for the establishment of hospital material management information system, set the various management modules, production of various statistical reports, standard operating procedures. The system is convenient, functional and strong, fluent statistical functions. It can always fully grasp and understand the whole hospital supplies run dynamic information, as a modern and effective tool for hospital materials management.

  8. Leaf LIMS: A Flexible Laboratory Information Management System with a Synthetic Biology Focus.

    Science.gov (United States)

    Craig, Thomas; Holland, Richard; D'Amore, Rosalinda; Johnson, James R; McCue, Hannah V; West, Anthony; Zulkower, Valentin; Tekotte, Hille; Cai, Yizhi; Swan, Daniel; Davey, Robert P; Hertz-Fowler, Christiane; Hall, Anthony; Caddick, Mark

    2017-12-15

    This paper presents Leaf LIMS, a flexible laboratory information management system (LIMS) designed to address the complexity of synthetic biology workflows. At the project's inception there was a lack of a LIMS designed specifically to address synthetic biology processes, with most systems focused on either next generation sequencing or biobanks and clinical sample handling. Leaf LIMS implements integrated project, item, and laboratory stock tracking, offering complete sample and construct genealogy, materials and lot tracking, and modular assay data capture. Hence, it enables highly configurable task-based workflows and supports data capture from project inception to completion. As such, in addition to it supporting synthetic biology it is ideal for many laboratory environments with multiple projects and users. The system is deployed as a web application through Docker and is provided under a permissive MIT license. It is freely available for download at https://leaflims.github.io .

  9. Medical image information system 2001. Development of the medical image information system to risk management- Medical exposure management

    International Nuclear Information System (INIS)

    Kuranishi, Makoto; Kumagai, Michitomo; Shintani, Mitsuo

    2000-01-01

    This paper discusses the methods and systems for optimizing the following supplements 10 and 17 for national health and medical care. The supplements 10 and 17 of DICOM (digital imaging and communications in medicine) system, which is now under progress for the purpose to keep compatibility within medical image information system as an international standard, are important for making the cooperation between HIS (hospital information system)/RIS (radiation information system) and modality (imaging instruments). Supplement 10 concerns the system to send the information of patients and their orders through HIS/RIS to modality and 17, the information of modality performed procedure step (MPPS) to HIS/RIS. The latter defines to document patients' exposure, a part of which has not been recognized in Japan. Thus the medical information system can be useful for risk-management of medical exposure in future. (K.H.)

  10. Medical image information system 2001. Development of the medical image information system to risk management- Medical exposure management

    Energy Technology Data Exchange (ETDEWEB)

    Kuranishi, Makoto; Kumagai, Michitomo; Shintani, Mitsuo [Toyama Medical and Pharmaceutical Univ. (Japan). Hospital

    2000-12-01

    This paper discusses the methods and systems for optimizing the following supplements 10 and 17 for national health and medical care. The supplements 10 and 17 of DICOM (digital imaging and communications in medicine) system, which is now under progress for the purpose to keep compatibility within medical image information system as an international standard, are important for making the cooperation between HIS (hospital information system)/RIS (radiation information system) and modality (imaging instruments). Supplement 10 concerns the system to send the information of patients and their orders through HIS/RIS to modality and 17, the information of modality performed procedure step (MPPS) to HIS/RIS. The latter defines to document patients' exposure, a part of which has not been recognized in Japan. Thus the medical information system can be useful for risk-management of medical exposure in future. (K.H.)

  11. The role of information systems in management decision making-an theoretical approach

    Directory of Open Access Journals (Sweden)

    PhD. Associate Professor Department of Management & Informatics Mihane Berisha-Namani

    2010-12-01

    Full Text Available In modern conditions of globalisation and development of information technology, information processing activities have come to be seen as essential to successful of businesses and organizations. Information has become essential to make decisions and crucial asset in organisations, whereas information systems is technology required for information processing. The application of information systems technology in business and organisations has opened up new possibilities for running and managing organisations, as well as has improved management decision making. The purpose of this paper is to give an understanding of the role that information systems have in management decision making and to discuss the possibilities how managers of organisations can make best use of information systems. The paper starts with identifying the functions of management and managerial roles and continue with information systems usage in three levels of decision making. It specifically addresses the way how information systems can help managers reduce uncertainty in decision making and includes some important implications of information systems usage for managers. Thus, this study provide a framework of effective use of information systems generally and offers an alternative approach to investigate the impact that information systems technology have in management decision making specifically

  12. The database system for the management of technical documentations of PWR fuel design project using CD-ROM

    International Nuclear Information System (INIS)

    Park, Bong Sik; Lee, Won Jae; Ryu, Jae Kwon; Jo, In Hang; Chang, Jong Hwa.

    1996-12-01

    In this report, the database system developed for the management of technical documentation of PWR fuel design project using CD-ROM (compact disk - read only memory) is described. The database system, KIRDOCM (KAERI Initial and Reload Fuel project technical documentation management), is developed and installed on PC using Visual Foxpro 3.0. Descriptions are focused on the user interface of the KIRDOCM. Introduction addresses the background and concept of the development. The main chapter describes the user requirements, the analysis of computing environment, the design of KIRDOCM, the implementation of the KIRDOCM, user's manual of KIRDOCM and the maintenance of the KIRDOCM for future improvement. The implementation of KIRDOCM system provides the efficiency in the management, maintenance and indexing of the technical documents. And, it is expected that KIRDOCM may be a good reference in applying Visual Foxpro for the development of information management system. (author). 2 tabs., 13 figs., 8 refs

  13. ELAN - expert system supported information and management system for analytical laboratories

    International Nuclear Information System (INIS)

    Jaeschke, A.; Orth, H.; Zilly, G.

    1990-08-01

    The demand for high efficiency and short response time calls for the use of computer support in chemico-analytical laboratories. This is usually achieved by laboratory information and management systems covering the three levels of analytical instrument automation, laboratory operation support and laboratory management. The management component of the systems implemented up to now suffers from a lack of flexibility as far as unforeseen analytical investigations outside the laboratory routine work are concerned. Another drawback is the lack of adaptability with respect to structural changes in laboratory organization. It can be eliminated by the application of expert system structures and methods for the implementation of this system level. The ELAN laboratory information and management system has been developed on the basis of this concept. (orig.) [de

  14. Grenada Education Management Information System

    OpenAIRE

    Porta, Emilio; Klein, Jennifer; Arcia, Gustavo; Nannyonjo, Harriet

    2012-01-01

    The Education Management Information System (EMIS) country report for Grenada includes the following headings: background which includes education data in Grenada, EMIS staff, facilities and equipment, EMIS data, and publications; prerequisites of quality; assurances of integrity; methodological soundness; accuracy and reliability; serviceability; and accessibility.

  15. Competency development information system - Knowledge management based competency development management tool

    International Nuclear Information System (INIS)

    Aminuddin, R.; Zainuddin, Z.; Taib, Z.; Hamid, A.H.Ab.; Hamdan, S.N.

    2007-01-01

    information on business or division level mission, vision, objectives, strategies, projects and activities. From here the desired competencies are identified and broken down into knowledge and knowledge content. From this process the organization knowledge taxonomy is derived. The next process is the knowledge needs analysis conducted at group level and then at individual level. The level of all identified knowledge necessary to carryout planned projects and activities are assessed at group and individual level on a scale of 1-10. This process is conducted in a group lead by the group leader or manager. The knowledge profile that results is presented graphically and the knowledge gap that has to be filled through some learning initiatives is clearly portrayed Having identified the gap, the next task is to identify the knowledge sources in the form of books, journal articles, websites, laboratories, experts, vendors, electronic media and organised training and these are keyed into the system. At this stage individual staff would have enough information to plan his learning and knowledge acquisition. He would then plan his learning using the training plan module. He can learn through self directed learning or go for courses, seminars, attachments, scientific visit, or Masters and PhD. The time, place, budget and source of fund need to be determined. The staff biodata and development plan is also captured by the system. After implementing the training, the staff must submit a report and lessons learnt to the system. The system requires that the supervisor evaluates the training effectiveness, reviews recommendations and lessons learnt that was submitted and support and facilitate application of learning and implementation of any useful recommendations as a result of the training All the learning initiatives should increase the knowledge and competency level. This assessment is conducted on a regular basis to evaluate the effectiveness of learning initiatives and investment in

  16. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  17. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  18. Development of the Advanced Nuclear Safety Information Management (ANSIM) System

    Energy Technology Data Exchange (ETDEWEB)

    Sohn, Jae Min; Ko, Young Cheol; Song, Tai Gil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    Korea has become a technically independent nuclear country and has grown into an exporter of nuclear technologies. Thus, nuclear facilities are increasing in significance at KAERI (Korea Atomic Energy Research Institute), and it is time to address the nuclear safety. The importance of nuclear safety cannot be overemphasized. Therefore, a management system is needed urgently to manage the safety of nuclear facilities and to enhance the efficiency of nuclear information. We have established ISP (Information Strategy Planning) for the Integrated Information System of nuclear facility and safety management. The purpose of this paper is to develop a management system for nuclear safety. Therefore, we developed the Advanced Nuclear Safety Information Management system (hereinafter referred to as the 'ANSIM system'). The ANSIM system has been designed and implemented to computerize nuclear safety information for standardization, integration, and sharing in real-time. Figure 1 shows the main home page of the ANSIM system. In this paper, we describe the design requirements, contents, configurations, and utilizations of the ANSIM system

  19. Information Manager (The)

    African Journals Online (AJOL)

    The Information Manager is an Interdisciplinary Journal which provides a forum for the ... It serves as a forum for new research in information dissemination and communication processes in general, The basic focus of Information manager are: i. to ... Influence of Mac Arthur Journal Donation Project on Serial Resources of ...

  20. SGDes project. Decommissioning management system of Enresa

    International Nuclear Information System (INIS)

    Fernandez Lopez, M.; Julian, A. de

    2013-01-01

    ENRESA, the public company responsible for managing radioactive waste produced in spain and nuclear facilities decommissioning work, has developed a management information system (SGDes) for the decommissioning of nuclear power plants, critical for the company. SGDes system is capable of responding to operational needs for efficient, controlled and secure way. Dismantling activities require a rigorous operations control within highly specialized, process systematization and safety framework, both the human and technological point of view. (Author)

  1. Bureau Management Technologies and Information Systems in Developing Countries

    OpenAIRE

    Mehmet Altınöz

    2008-01-01

    This study focuses on bureau management technologies and information systems in developing countries. Developing countries use such systems which facilitate executive and organizational functions through the utilization of bureau management technologies and provide the executive staff with necessary information. The concepts of data and information differ from each other in developing countries, and thus the concepts of data processing and information processing are di...

  2. Solving a Health Information Management Problem. An international success story.

    Science.gov (United States)

    Hannan, Terry J

    2015-01-01

    The management of health care delivery requires the availability of effective 'information management' tools based on e-technologies [eHealth]. In developed economies many of these 'tools' are readily available whereas in Low and Middle Income Countries (LMIC) there is limited access to eHealth technologies and this has been defined as the "digital divide". This paper provides a short introduction to the fundamental understanding of what is meant by information management in health care and how it applies to all social economies. The core of the paper describes the successful implementation of appropriate information management tools in a resource poor environment to manage the HIV/AIDS epidemic and other disease states, in sub-Saharan Africa and how the system has evolved to become the largest open source eHealth project in the world and become the health information infrastructure for several national eHealth economies. The system is known as Open MRS [www.openmrs.org). The continuing successful evolution of the OpenMRS project has permitted its key implementers to define core factors that are the foundations for successful eHealth projects.

  3. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  4. Knowledge Management in Product Development Projects

    International Nuclear Information System (INIS)

    Sheik Muhamad, S.

    2016-01-01

    Full text: Product data management system (PDM) solutions control vast quantities of information generated by engineers during the product development process. They provide vaulting capabilities to control access to shared data,workflow to distribute it, and configured product structures to relate it to product components. Nuclear Malaysia has the desire to have a proper CAD management system and this is achieved with the use of PDM system to manage all their designs throughout the product lifecycle, i.e., for drawing distribution and design change. The type of documents that Nuclear Malaysia manages are CAD files (as generated by CATIA, AUTOCAD), engineering files, reports, project files, documents (WORD, PDF), spreadsheet (EXCEL), bills of material, manufacturing processes and drawings. Besides managing drawings, we also want to control and manage engineering changes (ECO & ECR) in electronic format. (author

  5. Development of technical information processing system(VI)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jee Hoh; Kim, Tae Hwan; Choi, Kwang; Chung, Hyun Sook; Keum, Jong Yong [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-12-01

    This project is to establish high-quality information circulation system by developing serials-control system to improve serials management from ordering to distributing and availability on R and D and to advance in quality of information service needed in R and D by fast retrieval and providing of research information with CD-Net. The results of the project are as follows. 1. Serials management process which covers from ordering to distributing have higher efficiency by development of subscription information system. 2. Systematic control on each issue of serials is achieved by development of serials checking system. 3. It is possible to provide vol. and no. information of issue received currently to researchers promptly by improvement of serials holding information system. 4. Retrieval of research information contained in various CD-ROM DB throughout KAERI-NET is possible by research on construction methods of CD-Net. 2 figs, 25 refs. (Author).

  6. Development of technical information processing system(VI)

    International Nuclear Information System (INIS)

    Lee, Jee Hoh; Kim, Tae Hwan; Choi, Kwang; Chung, Hyun Sook; Keum, Jong Yong

    1994-12-01

    This project is to establish high-quality information circulation system by developing serials-control system to improve serials management from ordering to distributing and availability on R and D and to advance in quality of information service needed in R and D by fast retrieval and providing of research information with CD-Net. The results of the project are as follows. 1. Serials management process which covers from ordering to distributing have higher efficiency by development of subscription information system. 2. Systematic control on each issue of serials is achieved by development of serials checking system. 3. It is possible to provide vol. and no. information of issue received currently to researchers promptly by improvement of serials holding information system. 4. Retrieval of research information contained in various CD-ROM DB throughout KAERI-NET is possible by research on construction methods of CD-Net. 2 figs, 25 refs. (Author)

  7. Factors Affecting the Full Use of Library and Information Management Systems by Library Personnel

    Science.gov (United States)

    Skretas, Georgios

    2005-01-01

    Purpose: To provide a general list of factors that affects and determines the full use of library information management systems (LIMS) by library staff. Design/methodology/approach: The factors, which were identified mainly during participation in the implementation of automation projects in Greece, are listed and briefly analysed in categories…

  8. Planning for management information systems in drug treatment organizations.

    Science.gov (United States)

    Zalkind, D; Zelon, H; Moore, M; Kaluzny, A

    1979-02-01

    An attempt to set up a management information system for individual drug abuse programs throughout a state is described. The principles upon which the system is based are discussed along with the problems encountered in its implementation. A series of guidelines for establishing management information systems in operating human services agencies is included.

  9. Effects of an incinerator project on a healthcare-waste management system.

    Science.gov (United States)

    Khammaneechan, Patthanasak; Okanurak, Kamolnetr; Sithisarankul, Pornchai; Tantrakarnapa, Kraichat; Norramit, Poonsup

    2011-10-01

    This evaluative research study aimed to assess the effects of the central healthcare incinerator project on waste management in Yala Province. The study data were collected twice: at baseline and during the operational phase. A combination of structured interview and observation were used during data collection. The study covered 127 healthcare facilities: government hospitals, healthcare centres, and private clinics. The results showed 63% of healthcare risk waste (HCRW) handlers attended the HCRW management training. Improvements in each stage of the HCRW management system were observed in all groups of facilities. The total cost of the HCRW management system did not change, however; the costs for hospitals decreased, whereas those for clinics increased significantly. It was concluded that the central healthcare waste incinerator project positively affected HCRW management in the area, although the costs of management might increase for a particular group. However, the benefits of changing to a more appropriately managed HCRW system will outweigh the increased costs.

  10. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  11. Decision Making Based On Management Information System and Decision Support System

    Directory of Open Access Journals (Sweden)

    Şükrü Ada

    2015-04-01

    Full Text Available Information hasbecome an essentialresource for managing modern organizations. This is so because today’sbusiness environment is volatile, dynamic, turbulent and necessitates the burgeoning demand for accurate, relevant, complete,timely and economical information needed to drive the decision-making process in order to accentuate organizational abilities to manage opportunities and threat. MIS work on online mode with an average processing speed. Generally, it is used by low level management. Decision support system are powerful tool that assist corporate executives, administrators and other senior officials in making decision regarding the problem. Management Information Systems is a useful tool that provided organized and summarized information in a proper time to decision makers and enable making accurate decision for managers in organizations. This paper will discuss the concept, characteristics, types of MIS, the MIS model, and in particular it will highlight the impact and role of MIS on decision making.

  12. INFORMATION-ANALYTICAL LEARNING MANAGEMENT SYSTEM UNIVERSITIES

    Directory of Open Access Journals (Sweden)

    Yu. Tryus

    2016-12-01

    Full Text Available We consider conceptual approaches to creation of information systems, learning management school, which uses modern methods of decision-making and simulational modeling, web-technologies. The main criteria for the selection of development tools of the system are: openness, free of charge, easy to use and independence from system software and hardware. The chosen technology and the system itself satisfies such requirements as: focus on national and international standards in the field of higher education, adherence to service-oriented architecture, ensuring stable operation with a large number of users, support for a clear division of user rights to obtain and change information resources, software modularity the final product and its ability to integrate into the corporate information system of the university

  13. TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2015-05-01

    Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.

  14. A Management Information System Model for Program Management. Ph.D. Thesis - Oklahoma State Univ.; [Computerized Systems Analysis

    Science.gov (United States)

    Shipman, D. L.

    1972-01-01

    The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

  15. The Conception of the Information Management of Innovation Project and the Stages of its Implementation

    Directory of Open Access Journals (Sweden)

    Babinska Solomiia Ya.

    2017-01-01

    Full Text Available The informational support plays an important role in the development and implementation of innovative projects, is a prerequisite for development of its conception. Proceeding from this, the article considers approaches of scientists to components of the life cycle of innovation project, revealing that the most of them would allocate three phases (development, implementation, and completion. In terms of the information support for each of these stages were defined objectives, tasks, managerial decisions (selecting of an innovation object; choosing the economy sector; identifying sources of financing; costing; substantiating expediency as to implementing a project; choosing counter-parties; product pricing; selecting markets; further use of the property objects, information arrays, necessary sources of information, it was considered how the conception of information management of innovation project is being implemented in stages.

  16. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  17. Geographical Information System, to support the management of water resource in rural basins

    International Nuclear Information System (INIS)

    Correa V, Paula Lizet; Velez U, Jaime Ignacio

    2002-01-01

    The implementation of a GIS support system for the management of water resources at a catchment scale is presented. This system is based upon the hidroSIG java software, which was developed within the Atlas Hidrologico de Colombia project. In the GIS database was included all the information required by the environmental authorities in charge of the water resources management, offering the possibility of displaying, consulting and evaluating different scenarios that could help to make decisions upon the assignation and use of the resource. As a first application of the GIS, a 35 km 2 river basin located in Rionegro Plateau was used. The applied methodology was developed in the following stages: gathering of the available information, processing of the digital topography, study of the dynamics of the climate in the zone, evaluation of the water availability, and evaluation of the demand and water balance. The results obtained show the importance of having continuous and articulated spatial information in a GIS, so permanent update of the information is allowed. It is concluded that the implemented GIS constitutes a valuable tool for planning and management of the hydric resource within a hydrographic basin

  18. Management of Control System Information SecurityI: Control System Patch Management

    Energy Technology Data Exchange (ETDEWEB)

    Quanyan Zhu; Miles McQueen; Craig Rieger; Tamer Basar

    2011-09-01

    The use of information technologies in control systems poses additional potential threats due to the frequent disclosure of software vulnerabilities. The management of information security involves a series of policy-making on the vulnerability discovery, disclosure, patch development and patching. In this paper, we use a system approach to devise a model to understand the interdependencies of these decision processes. In more details, we establish a theoretical framework for making patching decision for control systems, taking into account the requirement of functionability of control systems. We illustrate our results with numerical simulations and show that the optimal operation period of control systems given the currently estimated attack rate is roughly around a half a month.

  19. MODELS AND METHODS OF SAFETY-ORIENTED PROJECT MANAGEMENT OF DEVELOPMENT OF COMPLEX SYSTEMS: METHODOLOGICAL APPROACH

    Directory of Open Access Journals (Sweden)

    Олег Богданович ЗАЧКО

    2016-03-01

    Full Text Available The methods and models of safety-oriented project management of the development of complex systems are proposed resulting from the convergence of existing approaches in project management in contrast to the mechanism of value-oriented management. A cognitive model of safety oriented project management of the development of complex systems is developed, which provides a synergistic effect that is to move the system from the original (pre condition in an optimal one from the viewpoint of life safety - post-project state. The approach of assessment the project complexity is proposed, which consists in taking into account the seasonal component of a time characteristic of life cycles of complex organizational and technical systems with occupancy. This enabled to take into account the seasonal component in simulation models of life cycle of the product operation in complex organizational and technical system, modeling the critical points of operation of systems with occupancy, which forms a new methodology for safety-oriented management of projects, programs and portfolios of projects with the formalization of the elements of complexity.

  20. Implementation of a change management solution based on a product lifecycle management system for a large international project

    International Nuclear Information System (INIS)

    Luehr, Anneke

    2011-08-01

    This Thesis describes the implementation of a Change Management solution based on a Product Lifecycle Management System (PLM System) for a large international project. The objective of Change Management is to ensure a systematic line of action for approving and implementing changes in the project. The Deutsches Elektronen-Synchrotron DESY is one of the world's leading accelerator centres with locations in Hamburg and Zeuthen. Currently, DESY participates in the realization of the international research facility European X-Ray Free-Electron Laser (XFEL) at the Hamburg site. DESY was responsible for the planning of the XFEL. When the project entered the construction phase it was internationalized and now comprises project groups in 12 countries. Thus the requirements on Change Management have changed, as participants from several labs at many different locations are now involved. First the project scope is described and then a target process for the Change Management solution is developed by a requirement analysis. Afterwards the technical implementation of this process in DESY's PLM System is described and the Change Management solution is tested. The process is visualized using the Unified Modeling Language (UML). Finally a description is given of how to transfer the solution to the project

  1. Region 7 Laboratory Information Management System

    Data.gov (United States)

    U.S. Environmental Protection Agency — This is metadata documentation for the Region 7 Laboratory Information Management System (R7LIMS) which maintains records for the Regional Laboratory. Any Laboratory...

  2. Management system information of characterization of the dismantling project of Jose Cabrera; Sistema de Gestion de la informacion de caracterizacion del proyecto de desmantelamiento de la CN Jose Cabrera

    Energy Technology Data Exchange (ETDEWEB)

    Gimeno Blesa, M. E.; Martin Palomo, N.; Gomez Rodriguez, C. A.

    2011-07-01

    In the proposed dismantling and decommissioning of the Jose Cabrera NPP is designed and implemented a database of physical and radiological inventory, which provides a powerful tool to optimize the storage, monitoring and control of the characterization data. The database is a useful and reliable management system characterization information that facilitates access and information processing, and ensures their integrity and traceability along of the dismantling project.

  3. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  4. KNOWLEDGE MANAGEMENT AND INFORMATION SYSTEMS IN ORGANIZATIONS

    Directory of Open Access Journals (Sweden)

    Karla Torres

    2015-11-01

    Full Text Available At present, knowledge and information are considered vital resources for organizations, so some of them have realized that the creation, transfer and knowledge management are essential for success. This paper aims to demonstrate knowledge management as a transformative power for organizations using information systems; addressing the study from the interpretive perspective with the use of hermeneutical method in theory, documentary context. It is concluded that people living in a changing characteristic environment of the globalized world companies and motivated by the same company changes have accelerated in them the generation and acquisition of new knowledge and innovative capabilities to achieve competitive positions with the help of systems of information.

  5. Onondaga Lake Watershed – A Geographic Information System Project Phase I – Needs assessment and spatial data framework

    Science.gov (United States)

    Freehafer, Douglas A.; Pierson, Oliver

    2004-01-01

    In the fall of 2002, the Onondaga Lake Partnership (OLP) formed a Geographic Information System (GIS) Planning Committee to begin the process of developing a comprehensive watershed geographic information system for Onondaga Lake. The goal of the Onondaga Lake Partnership geographic information system is to integrate the various types of spatial data used for scientific investigations, resource management, and planning and design of improvement projects in the Onondaga Lake Watershed. A needs-assessment survey was conducted and a spatial data framework developed to support the Onondaga Lake Partnership use of geographic information system technology. The design focused on the collection, management, and distribution of spatial data, maps, and internet mapping applications. A geographic information system library of over 100 spatial datasets and metadata links was assembled on the basis of the results of the needs assessment survey. Implementation options were presented, and the Geographic Information System Planning Committee offered recommendations for the management and distribution of spatial data belonging to Onondaga Lake Partnership members. The Onondaga Lake Partnership now has a strong foundation for building a comprehensive geographic information system for the Onondaga Lake watershed. The successful implementation of a geographic information system depends on the Onondaga Lake Partnership’s determination of: (1) the design and plan for a geographic information system, including the applications and spatial data that will be provided and to whom, (2) the level of geographic information system technology to be utilized and funded, and (3) the institutional issues of operation and maintenance of the system.

  6. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  7. COMMUNICATION AND INFORMATION SYSTEM MANAGEMENT INTERNATIONAL

    Directory of Open Access Journals (Sweden)

    Mircea Alexandru Răduţeanu

    2012-01-01

    Full Text Available In recent decades international management itself as a separate component of the general science of leadership, is an intercultural management. In this context of globalization, computerization, any business that wants have a modern management should have a structured information system based on communication, overall objective consisting in providing accurate data in real time all parties, increasing the level of communication. Given these considerations, we conducted this work trying to highlight the role of communication in achieving a modern, emphasizing international management features.The paper is divided into 6 parts, prefaced by an introduction of the paper we presented and completed within a set of conclusions on the effectiveness of communication. During the other paragraphs, we present the theoretical concepts of international management, communication, after which I stressed the role of information communication, managerial communication and will then focus on the process, taking stock of its specific stages in international management.

  8. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Schillinger, Wolfgang; Weidemann, Rainer

    2016-01-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  9. Information management in Iranian Maternal Mortality Surveillance System.

    Science.gov (United States)

    Sadoughi, Farahnaz; Karimi, Afsaneh; Erfannia, Leila

    2017-07-01

    Maternal mortality is preventable by proper information management and is the main target of the Maternal Mortality Surveillance System (MMSS). This study aimed to determine the status of information management in the Iranian Maternal Mortality Surveillance System (IMMSS). The population of this descriptive and analytical study, which was conducted in 2016, included 96 administrative staff of health and treatment deputies of universities of medical sciences and the Ministry of Health in Iran. Data were gathered by a five-part questionnaire with confirmed validity and reliability. A total of 76 questionnaires were completed, and data were analyzed using SPSS software, version 19, by descriptive and inferential statistics. The relationship between variables "organizational unit" and the four studied axes was studied using Kendall's correlation coefficient test. The status of information management in IMMSS was desirable. Data gathering and storage axis and data processing and compilation axis achieved the highest (2.7±0.46) and the lowest (2.4±0.49) mean scores, respectively. The data-gathering method, control of a sample of women deaths in reproductive age in the universities of medical sciences, use of international classification of disease, and use of this system information by management teams to set resources allocation achieved the lowest mean scores in studied axes. Treatment deputy staff had a more positive attitude toward the status of information management of IMMSS than the health deputy staff (p=0.004). Although the status of information management in IMMSS was desirable, it could be improved by modification of the data-gathering method; creating communication links between different data resources; a periodic sample control of women deaths in reproductive age in the universities of medical sciences; and implementing ICD-MM and integration of its rules on a unified system of death.

  10. Development of a network-based information infrastructure for fisheries and hydropower information in the Columbia River Basin : Final project report; TOPICAL

    International Nuclear Information System (INIS)

    Scheibe, Timothy D.; Johnson, Gary E.; Perkins, Bill

    1997-01-01

    The goal of this project was to help develop technology and a unified structure to access and disseminate information related to the Bonneville Power Administration's fish and wildlife responsibility in the Pacific Northwest. BPA desires to increase access to, and exchange of, information produced by the Environment Fish, and Wildlife Group in concert with regional partners. Historically, data and information have been managed through numerous centralized, controlled information systems. Fisheries information has been fragmented and not widely exchanged. Where exchange has occurred, it often is not timely enough to allow resource managers to effectively use the information to guide planning and decision making. This project (and related projects) have successfully developed and piloted a network-based infrastructure that will serve as a vehicle to transparently connect existing information systems in a manner that makes information exchange efficient and inexpensive. This project was designed to provide a mechanism to help BPA address measures in the Northwest Power Planning Council's (NPPC) Fish and Wildlife program: 3.2H Disseminate Research and Monitoring Information and 5.1A.5 manage water supplies in accordance with the Annual Implementation Work Plan. This project also provided resources that can be used to assist monitoring and evaluation of the Program

  11. A Three Cohort Study of Role-Play Instruction for Agile Project Management

    Science.gov (United States)

    Schmitz, Kurt

    2018-01-01

    Agile Project Management methods and processes that emphasize action and feedback over planning continue to gain prominence for Information Systems projects. This topic is an ideal candidate to lead the evolution of project management instruction from teaching "about" to learning "how to." This paper describes a role-play…

  12. Establishing management information system to solve the information management problem of nuclear safety related personnel's qualification management

    International Nuclear Information System (INIS)

    Sun Haipeng; Liu Zhijun; Li Tianshu

    2013-01-01

    With the rapid progress of nuclear energy and nuclear technology utilization, nuclear safety related personnel play an increasingly important role in ensuring nuclear safety. NNSA personnel qualification management information system conducts a multi-faceted, effective, real-time monitoring and information collection for nuclear safety staff practice unit management, knowledge management, license application, appraisal management or supervision, training management or supervision and certified staff management, and also is a milestone for NNSA to build the state department with 'five-feature' (learning-oriented, service-oriented, economical, innovative, clean-type). (authors)

  13. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  14. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. [Tennessee Univ., Knoxville, TN (United States)

    1992-08-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  15. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. (Tennessee Univ., Knoxville, TN (United States))

    1992-01-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  16. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  17. Knowledge Management in Projects: Insights from two Perspectives

    DEFF Research Database (Denmark)

    Christensen, Karina Skovvang; Bukh, Per Nikolaj

    2009-01-01

    The article focuses on how managerial options in relation to development and sharing of knowledge in projects can be extended by analysing project management from two different, but complementary, knowledge management perspectives: an artefact-oriented and a process-oriented perspective. Further......, the article examines how a similar project management model is used in two different organisations and how its role in knowledge management differs dependent on other knowledge management initiatives and how the production processes are structured. Following the artefact-oriented perspective, the explicit...... dimension of knowledge can be captured, retrieved and reused using knowledge management systems. From the process-oriented perspective, focus is on the tacit or implicit dimension of knowledge and the context for understanding the information is more important. It is concluded that if a company offers...

  18. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  19. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  20. Information systems for the materials management department: stand-alone and enterprise resource planning systems.

    Science.gov (United States)

    2005-03-01

    Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.

  1. Information technology support for emergency management

    International Nuclear Information System (INIS)

    Uuspaeae, P.

    1990-01-01

    Information systems for distributed decision support for emergency management are considered. Specific applications include nuclear power plant emergencies. Emergencies in other industries such as chemical industry may also be considered. Research in the ISEM project is briefly summarized

  2. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  3. Building the future of healthcare. Part III: managing the build. Hospital leaders are moving forward using specialized IT tools to help them manage today's complex new-construction projects.

    Science.gov (United States)

    Lawrence, Daphne

    2010-05-01

    Hospital leaders are increasing making use of project management information systems (PMIS), which are built around documentation and communication of project-specific information. PMIS solutions are being applied to the daunting challenge of managing the large volumes of information involved in new construction projects. Project management tools usually utilize a portal. These tools can interface with administrative systems for best effect. CIOs and other senior executives emphasize that good leadership and execution are fundamental to success, and that automated project management tools are supports, not substitutes for good strategic planning and execution.

  4. Financial management information systems 25 years of World Bank experience on what works and what doesn't

    CERN Document Server

    Dener, Cem; Dorotinsky, William Leslie

    2011-01-01

    Since 1984, the World Bank has financed 87 Financial Management Information System (FMIS) projects in 51 countries totaling over US 2.2 billion, of which US 938 million was for FMIS related information and communication technology (ICT) solutions. This study presents the World Bank?s experience with these investment operations to share the achievements and challenges observed, and provide guidance for improving the performance of future projects. The report is structured according to four overarching questions:?What historical patterns emerge from World Bank financed Treasury/FMIS projects?Thi

  5. Adapting the design of Anesthesia Information Management Systems to innovations depicted in Industrial Property documents.

    Science.gov (United States)

    Spyropoulos, B; Tzavaras, A; Zogogianni, D; Botsivaly, M

    2013-01-01

    The purpose of this paper is to present the design and the current development status of an Anesthesia Information Management System (AIMS). For this system, the physical and technical advances, depicted in relevant, recently published Industrial Property documents, have been taken into account. Additional innovative sensors create further data-load to be managed. Novel wireless data-transmission modes demand eventually compliance to further proper standards, so that interoperability between AIMS and the existing Hospital Information Systems is being sustained. We attempted to define, the state-of-the-art concerning the functions, the design-prerequisites and the relevant standards and of an "emerging" AIMS that is combining hardware innovation, real-time data acquisition, processing and displaying and lastly enabling the necessary interoperability with the other components of the existing Hospital Information Systems. Finally, we report based on this approach, about the design and implementation status, of our "real-world" system under development and discuss the multifarious obstacles encountered during this still on-going project.

  6. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  7. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  8. Ecological Forecasting Project Management with Examples

    Science.gov (United States)

    Skiles, J. W.; Schmidt, Cindy; Estes, Maury; Turner, Woody

    2017-01-01

    Once scientists publish results of their projects and studies, all too often they end up on the shelf and are not otherwise used. The NASA Earth Science Division established its Applied Sciences Program (ASP) to apply research findings to help solve and manage real-world problems and needs. ASP-funded projects generally produce decision support systems for operational applications which are expected to last beyond the end of the NASA funding. Because of NASAs unique perspective of looking down on the Earth from space, ASP studies involve the use of remotely sensed information consisting of satellite data and imagery as well as information from sub-orbital platforms. ASP regularly solicits Earth science proposals that address one or more focus areas; disasters mitigation, ecological forecasting, health and air quality, and water resources. Reporting requirements for ASP-funded projects are different from those typical for research grants from NASA and other granting agencies, requiring management approaches different from other programs. This presentation will address the foregoing in some detail and give examples of three ASP-funded ecological forecasting projects that include: 1) the detection and survey of chimpanzee habitat in Africa from space, 2) harmful algal blooms (HABs) in the California Current System affecting aquaculture facilities and marine mammal populations, and 3) a call for the public to identify North America wildlife in Wisconsin using trail camera photos. Contact information to propose to ASP solicitations for those PIs interested is also provided.

  9. Managing information technology security risk

    Science.gov (United States)

    Gilliam, David

    2003-01-01

    Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

  10. Information Management System for the California State Water Resources Control Board (SWRCB)

    Science.gov (United States)

    Heald, T. C.; Redmann, G. H.

    1973-01-01

    A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

  11. Waste Management Information System (WMIS) User Guide

    International Nuclear Information System (INIS)

    Broz, R.E.

    2008-01-01

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data through the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal

  12. Waste Management Information System (WMIS) User Guide

    Energy Technology Data Exchange (ETDEWEB)

    R. E. Broz

    2008-12-22

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

  13. Information System for Land-Use Planning and Management

    Institute of Scientific and Technical Information of China (English)

    YU Xiao; MIAO Fang

    2008-01-01

    In order to maintain the overall social interest in land use and improve the level of land administration, an information system for land-use planning and management (ISLUPM) was established, which is composed of presentation layer, business logic layer and data layer in the general structure. The application support platform of the ISLUPM, built based on COM, COM+ and .NET standard components, includes data engine, data management, assemblies, components management, operation management, and interface. Then, an elaboration was made on major functions of the ISLUPM, such as planning revision scheme, planning operation flow, digital processing, thematic analysis and inquiry, and preparation of the chart of reserved land resources. The developed system has been successfully applied to the land-use planning and management work of Longquanyi District, Chengdu, China. It may provide a reference for development of geographic information system (GIS) for land and resources.

  14. 24 CFR 572.230 - Cash and Management Information (C/MI) System.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Cash and Management Information (C... HOMES PROGRAM (HOPE 3) Grants § 572.230 Cash and Management Information (C/MI) System. Disbursement of HOPE 3 grant funds is managed through HUD's Cash and Management Information (C/MI) System for the HOPE...

  15. The management, control and implementation of SCADA projects

    OpenAIRE

    2012-01-01

    M.Ing. The dissertation covers the establishment of a project from the point of view of a project manager. The document refers to examples where possible to illustrate the actual process through which a project goes during the life-cycle of the project. The first chapter provides an introduction to the context of the project and informs the reader of the type of project which the dissertation discusses. An overview of SCAD A (Supervisory Control and Data Acquisition) systems is discussed f...

  16. Decoupling, re-Engaging: managing trust relationships in implementation projects

    DEFF Research Database (Denmark)

    Rose, Jeremy; Schlichter, Bjarne Rerup

    2012-01-01

    , and the complex demands of managing those fluctuations. We investigate evolving trust relationships in a longitudinal case analysis of a large Integrated Hospital System implementation for the Faroe Islands. Trust relationships suffered various breakdowns, but the project was able to recover and eventually meet...... its goals. Based on concepts from Giddens’ later work on modernity, we develop two approaches for managing dynamic trust relationships in implementation projects: decoupling and re-engaging.......An important aspect of the successful implementation of large information systems (such as ERP systems) is trust. These implementations impact the legitimate interests of many groups of stakeholders, and trust is a critical factor for success. Trust in the project is contingent upon many factors...

  17. Review of Current Geographic Information Systems Technology for TxDOT Pavement Management Information System

    Science.gov (United States)

    1998-05-01

    A geographic information system (GIS) is a tool for effectively managing and analyzing tremendous amounts of geographic information. It employs the essential principle of geography to organize in formation and express relationships between real-world...

  18. Data management strategies for multinational large-scale systems biology projects.

    Science.gov (United States)

    Wruck, Wasco; Peuker, Martin; Regenbrecht, Christian R A

    2014-01-01

    Good accessibility of publicly funded research data is essential to secure an open scientific system and eventually becomes mandatory [Wellcome Trust will Penalise Scientists Who Don't Embrace Open Access. The Guardian 2012]. By the use of high-throughput methods in many research areas from physics to systems biology, large data collections are increasingly important as raw material for research. Here, we present strategies worked out by international and national institutions targeting open access to publicly funded research data via incentives or obligations to share data. Funding organizations such as the British Wellcome Trust therefore have developed data sharing policies and request commitment to data management and sharing in grant applications. Increased citation rates are a profound argument for sharing publication data. Pre-publication sharing might be rewarded by a data citation credit system via digital object identifiers (DOIs) which have initially been in use for data objects. Besides policies and incentives, good practice in data management is indispensable. However, appropriate systems for data management of large-scale projects for example in systems biology are hard to find. Here, we give an overview of a selection of open-source data management systems proved to be employed successfully in large-scale projects.

  19. Research on information models for the construction schedule management based on the IFC standard

    Directory of Open Access Journals (Sweden)

    Weirui Xue

    2015-05-01

    Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.

  20. Managing collaboration across boundaries in health information technology projects.

    Science.gov (United States)

    Garrety, Karin; Dalley, Andrew; McLoughlin, Ian; Wilson, Rob; Yu, Ping

    2012-01-01

    One reason that it is so difficult to build electronic systems for collecting and sharing health information is that their design and implementation requires clear goals and a great deal of collaboration among people from diverse social and occupational worlds. This paper uses empirical examples from two Australian health informatics projects to illustrate the importance of boundary objects and boundary spanning activities in facilitating the high degree of collaboration required for the design and implementation of workable systems.